Democracy Spraffa

Agenda Document Pack - Executive Committee - 13/11/2024

South Lanarkshire Council · 13 November 2024
Back to Executive Committee — 13 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 05 November 2024 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 13 November 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson,
Robert Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea
Cowan, Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Lynsey Hamilton, Susan Kerr,
Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley
McDonald, Davie McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John
Ross, David Shearer, Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin
Hose, Cal Johnston-Dempsey, Ross Lambie, Hugh Macdonald, Elaine McDougall, Mark
McGeever, Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 2 October 2024
submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 7 - 1 April 2024 to 4 October
2024
Report dated 14 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
11 - 16 
4 Capital Budget 2024/2025 and Monitoring for Period 7 - 1 April 2024
to 4 October 2024
Report dated 23 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
17 - 26 
5 Update to Funding
Report dated 18 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
27 - 30 
6 Employee Workforce Monitoring Information April to September 2024
Summary
Report dated 23 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
31 - 54 
7 Community Plan Quarter 4 Progress Report 2023/2024 and Annual
Outcomes Improvement Report
Report dated 23 October 2024 by the Chief Executive.  (Copy attached) 
55 - 146 
Item(s) for Decision 
8 2025/2026 Revenue Budget Gap and Savings
Report dated 31 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
147 - 194 
9 Glasgow City Region City Deal - Stewartfield Way Capacity
Enhancement Project - Outline Business Case
Report dated 23 October 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
195 - 208 
10  Transformation Fund - Phase 1 Update and Phase 2 Proposals
Joint report dated 30 October 2024 by the Executive Directors (Housing
and Technical Resources) and (Community and Enterprise
Resources).  (Copy attached) 
209 - 216
2

Page 3

11  Public Bodies Climate Change Duties - Annual Report 2023/2024
Report dated 24 October 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
217 - 248 
12  Recommendations Referred by Resource Committees
Report dated 30 October 2024 by the Chief Executive.  (Copy attached) 
249 - 252 
13  Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019 –
Report Consultation
Joint report dated 23 October 2024 by the Executive Directors (Finance
and Corporate Resources) and (Housing and Technical
Resources).  (Copy attached) 
253 - 264 
14  Response to Consultation on Proposal to Allow Proxy Voting by
Councillors
Report dated 14 October 2024 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
265 - 270 
Item(s) for Noting 
15  South Lanarkshire’s Children’s Services Plan 2023-2026 - Annual
Report of Progress for 2023/2024
Joint report dated 9 October 2024 by the Director, Health and Social Care
and Executive Director (Education Resources).  (Copy attached) 
271 - 316 
16  Local Child Poverty Action Report 2023/2024
Report dated 23 October 2024 by the Executive Director (Education
Resources).  (Copy attached) 
317 - 352 
17  Chief Social Work Officer Annual Report 2023/2024
Report dated 21 October 2024 by the Director, Health and Social
Care.  (Copy attached) 
353 - 410 
18  South Lanarkshire Integration Joint Board Annual Performance
Report 2023/2024
Report dated 25 September 2024 by the Director, Health and Social
Care.  (Copy attached) 
411 - 434 
Urgent Business 
19  Urgent Business
Any other items of business which the Chair decides are urgent. 
3

Page 4

Exclusion of Press and Public 
20  Exclusion of Press and Public
It is recommended that the Committee makes the following resolution:-  
"That, in terms of Section 50A(4) of the Local Government (Scotland) Act
1973, the press and public be excluded from the meeting for the following
item(s) of business on the grounds that it is likely that there will be
disclosure of exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act." 
Item(s) for Decision 
21  Heads of Terms Agreement for the Transfer of Centre West, East
Kilbride to South Lanarkshire Council
• Exempt information in terms of Paragraph 6 of Part I of Schedule 7A of
the Act
• Exempt information in terms of Paragraph 9 of Part I of Schedule 7A of
the Act 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via MS Teams and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 2 October 2024 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Ross Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cooper,
Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Mo Razzaq),
Councillor Maureen Devlin, Councillor Elise Frame, Councillor Lynsey Hamilton, Councillor Cal
Johnston-Dempsey (substitute for Councillor Maureen Chalmers), Councillor Susan Kerr, Councillor
Eileen Logan, Councillor Katy Loudon, Councillor Ian McAllan, Councillor Catherine McClymont,
Councillor Lesley McDonald, Councillor Elaine McDougall (substitute for Councillor Gladys Ferguson-
Miller), Councillor Davie McLachlan, Councillor Richard Nelson, Councillor Norman Rae, Councillor
Kirsten Robb, Councillor John Ross, Councillor David Shearer, Councillor Margaret B Walker 
Councillors’ Apologies:
Councillor Maureen Chalmers, Councillor Gladys Ferguson-Miller, Councillor Kenny McCreary,
Councillor Mo Razzaq 
Attending:
Chief Executive’s Service
P Manning, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director
Education Resources
A Donaldson, Head of Education (Inclusion); L Sherry, Head of Education (Support Service and
School Estate); D Hinshelwood, Support Services Manager
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; M Milne, Head of Personnel
Services; T Slater, Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
S Egan, Head of Housing Services
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 4 September 2024 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
2
5

Page 6

3 Revenue Budget Monitoring for Period 5 - 1 April to 9 August 2024 
A report dated 4 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing a forecast for the year to 31 March 2025 for the Council’s General Fund
Revenue Account and Housing Revenue Account. 
The year-end forecast to 31 March 2025 for both the Council’s General Fund Revenue Account
and Housing Revenue Account was a projected breakeven position as at 9 August 2024.  Details
were provided in the appendices to the report. 
Information was provided on the following key budget areas:- 
 teacher numbers
 employer’s pension contribution increase (teachers) 
The Committee decided: 
(1) that the projected break-even position on the General Fund Revenue Account for
2024/2025, and the actual spend as at 9 August 2024, as detailed in section 4 and Appendix
1 of the report, be noted; and 
(2) that the projected break-even position on the Housing Revenue Account for 2024/2025, and
the actual spend as at 9 August 2024, as detailed in section 5 and Appendix 2 of the report,
be noted. 
[Reference: Minutes of 4 September 2024 (Paragraph 3)] 
4 Capital Budget 2024/2025 and Monitoring for Period 5 - 1 April to 9 August 2024 
A report dated 4 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April to 9 August 2024. 
The revised programme for the General Fund for 2024/2025 was £87.007 million which included
previous adjustments approved by this Committee.  The programme also included further
proposed adjustments totalling an increase of £0.051 million, as detailed in Appendix 1 to the
report.  This reflected additional project funding for the Hamilton Town Centre Masterplan of
£0.100 million, partially offset by a reduction in budget for Electric Vehicle expansion of £0.040
million.  In addition, there were other minor adjustments to reflect revised timescales of works of
£0.009 million.  The overall programme was summarised in Appendix 2 to the report, with the
funding available to support the programme detailed in Appendix 3. 
Appendix 3 also showed a forecast for the financial year of £87.007 million.  Actual spend incurred
as at 9 August 2024 totalled £11.296 million.  Actual funding received up to 9 August 2024 was
£51.662 million.  This was also detailed in Appendix 3.  Relevant officers would continue to monitor
the generation of all income. 
Information was awaited on the new timetable for works and the resultant spend profiles for the
secondary schools projects, which would be included as an exception proposed to the November
Committee. 
The revised Housing Capital Programme for 2024/2025 amounted to £77.248 million. 
Programmed funding for the year also totalled £77.248 million. The funding sources were detailed
in Appendix 4 to the report.  Budget for the period amounted to £15.503 million and, as at 9 August
2024, £15.503 million had been spent. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum.  
6

Page 7

The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 to 3
of the report and the Housing Capital Programme, as detailed in Appendix 4 of the report,
as at 9 August 2024, be noted; 
(2) that the adjustments to the General Fund Capital programme, as detailed at Appendix 1 of
the report, be approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 4 September 2024 (Paragraph 4)] 
5 Update to Funding 
A report dated 4 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on additional funding, totalling £1.212 million, which had been made available to
the Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2024/2025 
(£m) 
Social Work 1.212 
Total 1.212 
The Committee decided: that the report be noted. 
[Reference: Minutes of 4 September 2024 (Paragraph 5)] 
6 Civic Engagement in Zeeland 
A report dated 8 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted in relation to the attendance of the Provost and Civic Officer at a civic event in
Zeeland from 25 to 27 October 2024. 
An invitation had been received from the Liberation Museum, Zeeland for the Provost to attend
activities commemorating the 80th anniversary of the Battle of the Scheldt.  Lanarkshire regiment,
The Cameronians (Scottish Riffles) had played a significant part in the liberation of the
Netherlands in 1944 and activities would include visits to a number of locations where the regiment
was involved in active duty. 
Information was provided on the proposed travel arrangements. 
An officer responded to points made by a member in relation to:- 
 Zeeland not being in Holland, as stated in the report, but a province of the Netherlands
 the Climate Change, Sustainability and Environmental Implications section of the report 
The Committee decided: that the Provost and Civic Officer attend a civic event in
Zeeland from 25 to 27 October 2024. 
7

Page 8

7 Religious Representation on the Education Resources Committee 
A joint report dated 11 September 2024 by the Executive Directors (Finance and Corporate
Resources) and (Education Resources) was submitted providing an update on religious
representation on the Education Resources Committee. 
At its meeting on 29 June 2022, the Committee had confirmed the appointment of Mr John
Mulligan as the religious representative from the Roman Catholic Church on the Education
Resources Committee.  Mr Mulligan had indicated that he would be stepping down from that
position and a replacement nomination had been sought.  Ms Angela Milton had been nominated
as the Roman Catholic Church’s representative on the Education Resources Committee. 
The Committee decided: that the appointment of Ms Angela Milton as the nominated
religious representative from the Roman Catholic Church be
confirmed. 
[Reference: Minutes of 7 August 2024 (Paragraph 12)] 
8 Appointment of Trustee to South Lanarkshire Leisure and Culture Board 
A report dated 17 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the appointment of a trustee to the South Lanarkshire Leisure and Culture
(SLLC) Board. 
Following a recent retiral, there was a vacancy for a trustee who was not an elected
member/officer of the Council, or a trade union representative.  In line with the constitution and
existing SLLC governance arrangements, as outlined in the report, Dr Gordon Jack had been
recommended by the Nominations Committee for appointment. 
Notification had also been received of the resignations of Councillors Anderson, Cowan and
Lambie and replacement nominations had been sought, with none received. 
The Committee decided: 
(1) that the approval to the appointment of Dr Gordon Jack as a trustee to the South Lanarkshire
Leisure and Culture Board be confirmed; 
(2) that the resignations of Councillors Anderson, Cowan and Lambie be noted; and 
(3) that it be noted that no nominations were received to fill the vacant positions. 
[Reference: Minutes of South Lanarkshire Council of 15 June 2022 (Paragraph 9)] 
9 Amendments to Memberships of Committees etc. 
A report dated 23 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on a proposed change to the membership of the Planning Committee and the
Planning Local Review Body. 
Following a request received from the Business Manager of the SNP Group on 23 September
2024, it was proposed that Councillor Johnston-Dempsey replace Councillor Frame on the
Planning Committee and the Planning Local Review Body. 
The Committee decided: that Councillor Johnston-Dempsey replace Councillor
Frame on the Planning Committee and the Planning Local
Review Body.  
8

Page 9

10 Council’s Approach to Impact Assessments 
A report dated 5 September 2024 by the Executive Director (Finance and Corporate Resources)
was submitted on the Council’s approach to impact assessments. 
At its meeting on 7 August 2024, the Committee agreed to adopt an integrated impact assessment
(IIA) approach due to the number of impact assessments that public authorities were subject to in
Scotland.  A summary of the different types of impact assessments that the Council might need
to undertake was provided in Appendix 1 to the report. 
The proposed form of IIA that the Council would use was attached as Appendix 2 to the report. 
This had been subject to a peer review by an external law firm to ensure it was fit for purpose and
training would be arranged for elected members on the new integrated approach.  The Council’s
committee report template would be amended accordingly, and impact assessments would be
published on the Council’s website, with a link provided in the relevant committee report. 
Officers responded to members’ questions in relation to:- 
 staff expertise/training
 best practice
 mitigating travel implications on the environment 
The Committee decided: 
(1) that the report be noted; and 
(2) that the proposed form of integrated impact assessment that the Council would use, as
detailed in Appendix 2 of the report, be noted. 
[Reference: Minutes of 7 August 2024 (Paragraph 11)] 
11 Urgent Business 
There were no items of urgent business. 
9

Page 10

10

Page 11

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 7 - 1 April 2024
to 4 October 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 4 October 2024
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2024/2025, and the actual spend as at 4 October 2024 (section 4 and
Appendix 1), be noted; 
(2) that the position on the 2024/2025 Early Outturn (sections 4.7 to 4.10) be
noted; and
(3) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 4 October 2024 (section 5 and
Appendix 2 of the report), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5). 
It will also provide the actual spend as at 4 October 2024. 
4. General Services 2024/2025 Projected Outturn as at 4 October 2024
4.1. As at 4 October 2024, the projected outturn position for 2024/2025 on the General
Services budget is break-even (Appendix 1).   
4.2. Section 4.3 onwards provides detail on a number of key budget areas.   
4.3. Teacher Numbers:  As previously reported, in relation to 2024/2025, the Council
has received notification that the allocation of funding for teacher numbers of £145.5
million for 2024/2025 will be distributed via Specific Resource Grants, and those
grants will be conditional on councils agreeing at the outset to maintain teacher
numbers.  Our share of the £145.5 million funding is £9.379 million. The Scottish
Government has indicated that it will consider mitigations presented by councils for
reducing teacher numbers, but it will not be known if mitigations will be acceptable
until much later in the year.    
3
11

Page 12

4.4. The Scottish Government have responded to communication from Council officers
continuing to reiterate that any mitigations would be considered on a case-by-case
basis, but they will not be in a position to agree any mitigations in advance of the
teacher number census publication (December 2024).  This position was reiterated
by Scottish Government officials at a meeting with Council officers on 27 August
2024.  At the meeting, officers explained the Council’s various mitigations in detail,
and undertook to provide these in writing to the Scottish Government to provide
context to the census information when this is complete.   
4.5. The initial submission of the teachers’ census position has been submitted, but a
response from the Scottish Government remains outstanding at this time. The final
position is expected to be reported early December 2024. 
4.6. Employers Pension Contribution Increase (Teachers):  As advised previously, on
1 April 2024, the Council’s pension contribution for Teachers’ Pensions was
increased from 23% to 26% of basic pay.  The cost to the Council is an estimated
£5.5 million.  The Scottish Government has agreed to provide the related
consequentials.  Latest information from Cosla suggests that the final figure will be
confirmed imminently for 2024/2025 and on a recurring basis to support the increase
in employer contributions to teachers’ pensions.  It has been agreed that 2024
teacher numbers are used for the distribution of this funding, as this most accurately
represents the SNCT workforce population across local government. This funding
will be paid as a redetermination to the General Revenue Grant in March 2025. 
2024/2025 Early Outturn
4.7. 2024/2025 Pay Award:  The Council’s Budget for 2024/2025 included an initial pay
award assumption for non-teachers from 1 April 2024 and for teachers from mid-
August 2024.  This was augmented by the UK Government Consequentials monies
(£3.7 million) which were set aside for pay awards.  The pay award for 2024/2025
has now been implemented and the cost of the award can be managed within the
pay assumptions for 2024/2025.  As we prepare for the 2025/2026 Budget and Pay
Award, the in-year (2024/2025) Consequentials funding of £3.6 million will be set
aside to contribute to the 2025/2026 Pay Award costs.  This is included in a further
report to this Committee (2025/2026 Revenue Budget Gap and Savings).   
4.8. Utilities: As noted in June 2024, recent information has suggested a downward trend
in utilities’ prices into 2024/2025 and this allowed a benefit to the 2025/2026 Strategy
of an estimated £2.000 million as at 2024/2025. The Council is a member of the buying
consortium who purchase wholesale energy in advance, on behalf of ourselves and
other public sector bodies.  This will materialise as an in-year underspend. 
4.9. Council Tax:  The Council Tax Budget for 2024/2025 assumed the impact of new
build properties during 2023/2024 and an estimate into 2024/2025.  Given the
current economic climate, and the potential risk that development would not progress
as originally anticipated, the budget estimates included a prudent assumption on
development numbers, and also that the arrears collection would not continue at the
current levels.  An early outturn has been completed on the 2024/2025 Council Tax
budget.  This is showing an estimated over-recovery of Council Tax income of £3.3
million for 2024/2025.  This reflects an even better level of arrears collection than
previously experienced, and also shows an increase in property numbers over and
above the budgeted level.  This will materialise as an in-year underspend.  
12

Page 13

4.10. The total underspend in relation to this early outturn work is £5.9 million.  While these
figures are significant, it is acknowledged that at the time of writing, neither the UK
Government nor the Scottish Government Budgets have been released for
2025/2026.  As a consequence, the Council has no certainty on its financial
settlement for 2025/2026.  The Council will not know its financial Settlement for
2025/2026 until after the UK Government and then the Scottish Government budget
is set with the Settlement itself due to be received by the Council on 12 December
2024.  This is a significant risk area in terms of the Budget Strategy and as a result, it
is proposed that no action is taken regarding the 2024/2025 one-off underspends,
and that instead, these are considered alongside the Settlement when it is received
in mid-December 2024.  Members will be updated on the impact of the Settlement in
January 2025.   
4.11. Transfers from Capital:  The Budget in Appendix 1 includes a £1.000 million transfer
from the Capital Programme for the Private Housing Scheme of Assistance project. 
Following a review of the spend, it has been identified that it cannot be classed as
Capital.  Therefore, it is proposed that budget of £1.000 million will be transferred to
Housing and Technical Resource’s Revenue budget.  This is an accounting
transaction only. The total overall budget for the project remains the same.   
4.12. Similarly, a review of the capital programme for Planned Asset Management is
ongoing to determine how much of this expenditure can be classed appropriately as
Capital. Any required transfer to Revenue will be included in the next report.   
5. Housing Revenue Account Projected Outturn Position as at 4 October 2024
5.1. As at 4 October 2024, Appendix 2 of the report shows a projected break-even position
on the Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in this
report.  
13

Page 14

10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
14 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 4 October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
14

Page 15

Note:  While the Year to Date Actual at period 7 presents a net surplus position (£19.545m), this is timing only.  The forecast outturn
shows break-even for the year. 
Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 126.170 126.170 0.000 0.00% 60.552
Facilities Waste and Grounds 77.307 77.144 0.163 0.21% 36.452
Leisure and Culture 21.738 21.750 (0.012) (0.06%) 13.204
Planning and Regulatory Services 4.659 4.464 0.195 4.19% 1.809
Enterprise and Sustainable Development 5.874 5.803 0.071 1.21% 3.105
Roads, Transportation and Fleet 16.592 17.009 (0.417) (2.51%) 5.982
Education Resources 463.729 463.729 0.000 0.00% 241.755
Education 463.729 463.729 0.000 0.00% 241.755
Finance and Corporate Resources 39.566 39.566 0.000 0.00% 27.321
Finance Services - Strategy 1.851 2.011 (0.160) (8.64%) 1.705
Finance Services - Transactions 17.684 17.501 0.183 1.03% 9.923
Audit and Compliance Services 0.318 0.304 0.014 4.40% 0.270
Information Technology Services 6.852 6.888 (0.036) (0.53%) 8.957
Communications and Strategy Services 2.575 2.496 0.079 3.07% 1.572
Administration and Licensing Services 4.048 4.086 (0.038) (0.94%) 2.130
Personnel Services 6.238 6.280 (0.042) (0.67%) 2.764
Housing & Technical Resources 14.390 14.390 0.000 0.00% 25.146
Housing Services 8.767 8.705 0.062 0.71% 5.682
Property Services 5.623 5.685 (0.062) (1.10%) 19.464
Social Work Resources 235.200 235.200 0.000 0.00% 113.884
Performance and Support Services 5.806 5.727 0.079 1.36% 2.543
Children and Families 48.199 48.687 (0.488) (1.01%) 22.747
Adults and Older People 180.460 180.460 0.000 0.00% 88.400
Justice and Substance Misuse 0.735 0.326 0.409 55.65% 0.194
Joint Boards 1.902 1.902 0.000 0.00% 1.024
880.957 880.957 0.000 0.00% 469.682
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 880.957 880.957 0.000 0.00% 469.682
CFCR 0.000 0.000 0.000 0.00% 0.000
Loan Charges 39.589 39.589 0.000 0.00% 0.000
Corporate Items 12.880 12.880 0.000 0.00% 0.567
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Total Expenditure 956.716 956.716 0.000 0.00% 470.249
Council Tax 181.587 181.587 0.000 0.00% 97.778
Less: Council Tax Reduction Scheme (23.544) (23.544) 0.000 0.00% (12.678)
158.043 158.043 0.000 0.00% 85.100
General Revenue Grant 386.662 386.662 0.000 0.00% 208.203
Non Domestic Rates 364.911 364.911 0.000 0.00% 196.491
Transfer from Reserves 47.100 47.100 0.000 0.00% 0.000
Total Income 956.716 956.716 0.000 0.00% 489.794
Net Expenditure 0.000 0.000 0.000 0.00% (19.545)
Period Ended 4 October 2024 (No.7)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
15

Page 16

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 13.782 14.163 (0.381) (2.76%) 1 6.899
Property Costs 60.703 60.251 0.452 0.74% 2 28.749
Supplies and Services 1.543 1.543 0.000 0.00% 0.303
Transport and Plant 0.195 0.175 0.020 10.26% 0.068
Administration 5.594 5.594 0.000 0.00% 0.224
Payment to Other Bodies 2.975 2.932 0.043 1.45% 1.074
Payment to Contractors 0.100 0.100 0.000 0.00% 0.127
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.000 0.00% 0.003
Total Controllable Exp. 118.465 118.331 0.134 0.11% 37.447
Total Controllable Inc. (123.397) (123.250) (0.147) 0.12% 3 (54.584)
Transfer to/(from) Balance Sheet (4.229) (3.511) (0.718) 16.98% 0.000
Net Controllable Exp. (9.161) (8.430) (0.731) 7.98% (17.137)
Loan Charges 9.161 8.430 0.731 7.98% 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (17.137)
Variance Explanations
1. The forecast overspnd in Employee Costs relates to the backfill arrangements for seconded staff to Projects.
2. The forecast underspend in Property Costs reflects the lower than budgeted Bad Debt write off, partially offset by an overspend on Repairs
and Maintenance.
3. The under-recovery of income is due to lower than budgeted laundry charges.
Virements
None.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 4 October 2024 (No.7)
Housing Revenue Account
16

Page 17

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2024/2025 and Monitoring for Period 7 -
1 April 2024 to 4 October 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
urpose]
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2024 to 4
October 2024 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the position of the General Fund Capital Programme (Appendices 1 to 3)
and the Housing Capital Programme (Appendix 4) as at 4 October 2024, be
noted; 
(2) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum.
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 4 October 2024 (period 7).  Spending has been split into two separate sections
below: 
 General Fund Capital Programme inc. Education, Social Work, Roads and
General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2024/2025 Budget:  The revised programme for the General Fund is £76.792 million. 
This revised programme consists of the base budget plus carry forward projects and
adjustments which have been agreed by the Executive Committee up to and including
its meeting on 2 October 2024.  
4
17

Page 18

4.2. In addition, the total programme of £76.792 million also includes proposed
adjustments contained at Appendix 1 which reflect lower budget required in the
current year for the Leisure and Transformation Fund projects to align with the profile
of expenditure across financial years (£4.900 million).  It also includes an adjustment
for the Secondary Schools expansion project to reflect the revised timescales of
works (£4.711 million) and similarly, for the Larkhall Leisure Centre project to reflect
the anticipated timing of expenditure (£1.027 million). 
4.3.  Transfers to Revenue:  In addition to the adjustments noted at Section 4.2, the
revised programme of £76.792 million also reflects a £1.000 million transfer to the
Revenue Budget for the Private Housing Scheme of Assistance project.  To reflect
Accounting Regulations, this spend cannot be classed as Capital.  Therefore, it is
proposed that budget of £1.000 million will be transferred to Housing and Technical
Resource’s Revenue budget. 
4.4.  Capital expenditure can be funded by Revenue monies, however, Revenue spend
cannot be paid for from Capital funding.  The Council’s Capital programme includes
funding that can be used for Revenue spend.  We are therefore able to move funding
between the Capital and Revenue Programmes and deliver the project as planned. 
This is an accounting transaction only. 
4.5. Similarly, the 2024/2025 capital programme includes an allocation of £4.300 million
for Planned Asset Management.  A review of this programme of works is ongoing and
will determine how much of this expenditure can be classed appropriately as Capital.
This will be included in the next report.  Regardless of the split, the total overall budget
for Planned Asset Management, across Capital and Revenue will remain at £4.300
million. 
4.6. The overall programme movement is detailed in Appendix 2. 
4.7. Nature Restoration Fund:  The Scottish Government had advised that Nature
Restoration Fund monies previously earmarked for 2024/2025 would be used to fund
the Local Government Pay Award in that year.  There was uncertainty regarding
whether these monies would be received in 2025/2026.  Recent correspondence has
confirmed receipt of Nature Restoration Fund funding next year and on that basis,
we would look to maximise spend in 2024/2025 on the basis we will get the money
back in 2025/2026. 
4.8. 2024/2025 Forecast:  As noted in 4.1, the total capital spending programme for the
year is £76.792 million (see Appendix 3).   
4.9. Appendix 3 also shows a forecast for the financial year of £76.792 million. 
4.10.  2024/2025 Actual Position:  Actual spend incurred to the 4 October 2024 totals
£17.581 million.   
4.11. Actual funding received to 4 October 2024 is £45.336 million. This is shown in
Appendix 3.  Relevant officers will continue to closely monitor the generation of all
income.  
18

Page 19

5. Housing Programme 
5.1. 2024/2025 Budget: Appendix 4 summarises the position on the Housing Programme
as at 4 October 2024.  The revised capital programme for the year is £77.248 million,
as approved by the Executive Committee on 2 October 2024. Programmed funding
for the year also totals £77.248 million. The funding sources are also detailed in
Appendix 4. 
5.2. 2024/2024 Forecast:  As noted in 5.1, the total capital spending programme for the
year is £77.248 million.  Current estimates from Housing and Technical Resources
have identified an outturn of £72.106 million for the year. 
5.3. Affordable Housing Supply Programme: The Scottish Government have
confirmed an additional £1.724 million in Resource Planning Assumption (RPA) for
2024/2025.  The total allocation of £24.558m is for both the Council and Registered
Social Landlords (RSL) projects in 2024/2025.  As a result of the element allocated
to RSLs as grant for projects, £0.324m of this is additional funding for the Council. 
5.4. The Affordable Housing budget for 2024/2025 is £43.742 million.  The current
estimated outturn for the financial year is £38.600 million, an underspend of £5.142
million.  This is a result of delays in site starts at Cairnswell Avenue, Cambuslang
and Brackenhill Farm, Hamilton.  In addition, the average purchase price for
properties purchased through the Market Purchase Scheme has reduced reflecting
the current size of properties. 
5.5. Given the estimated outturn for the year, the budget will not be increased by the
additional £0.324 million of Scottish Government funding.  Instead, the total
allocation of Scottish Government Grant will be claimed in full this financial year
(including the additional £0.324 million noted above), with the underspend reflected
in the lower level of borrowing required.  Opportunities continue to be explored to
utilise the uncommitted £5.142m in the current programme.  Any Council funding not
utilised in year (borrowing) will carry forward into the next financial year.   
5.6. 2024/2025 Actual Position:  Spend to 4 October 2024 on the Housing Capital
Programme amounts to £22.439 million.   
5.7. As at 4 October 2024, £22.439 million of funding had been received. 
5.8. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee.  
6. Employee Implications
6.1. None 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.  
19

Page 20

8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Equality Impact Assessment and Consultation Arrangements
9.1 This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and therefore no impact assessment is
required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 2 October 2024 
List of Background Papers
 Capital Ledger prints to 4 October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk  
20

Page 21

APPENDIX 1
(page 1)
Proposed Adjustments 
Community and Enterprise Resource 
McKirdy Park
Approval is sought to increase the 2024/2025 capital programme by £0.252 million
for the redevelopment of McKirdy Park including play area, community garden and
outdoor gym. 
The funding package is comprised as follows: 
 Renewable Energy Fund (£0.101m)
 Broken Cross Community Benefit (£0.055m)
 Cumberhead Wind Farm Community Benefit (£0.020m)
 Kype Muir Community Benefit (£0.025m)
 Lesmahagow Development Trust (£0.040m)
 Auchrobert Community Energy Society (£0.003m)
 Lesmahagow Community Council (£0.0005m)
 MyPark Scotland Public Fundraising (£0.008m) 
Larkhall Leisure Centre
The 2024/2025 includes budget of £1.742 million to be spent this financial year on
Larkhall Leisure Centre. Meetings with Hub South West have identified forecast
expenditure of £0.715 million on this project by end of March 2025. 
Approval is therefore sought to slip £1.027 million into financial year 2025/2026 to
reflect the timescales for this project. 
Place Based Investment Funding 2024/25
Funding from the Scottish Government of £0.589 million has been confirmed for the
next phase of the Place Based Investment Programme.  The purpose of this funding
is to support existing projects where commitments are in place, and the following
projects have been agreed with the Scottish Government to use the funding in
2024/2025: 
 Discover Lanark Outdoor Space: The project in conjunction with Lanark BID will
create a high-quality outdoor seating area in Lanark to support a vibrant and
attractive town centre.
 Coalyard: Town Centre Social Housing development bringing much needed
development to the town centre and improving town centre living. 
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.589 million for these projects.   
City Deal – Secondary Schools
Work on the expansion proposals for the secondary schools is ongoing with Hub
South West. The target programme for the projects is for a construction start in
summer 2025 with only early design work required in 2024/2025. 
Approval is therefore sought to slip £4.711 million into financial year 2025/2026 to
reflect the revised timescales of these projects. 
£0.252m 
(£1.027m) 
£0.589m 
(£4.711m) 
21

Page 22

The reduction to the current year programme is spilt between budget held in the City
Deal programme (£3.458 million) and Education Resources (£1.253 million).   
In addition, internal adaptation/reconfiguration works at Stonelaw High School are
being planned, to create 3 classrooms for the new school year in August 2025. 
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.400m, utilising Developers Contributions, and slip £0.350m of this into financial
year 2025/2026 to reflect the delivery timescales for the project. 
Leisure and Culture Transformation Fund
An initial programme of works totalling £8.4 million have been identified for phase 1. 
The current estimate of expenditure during 2024/2025 is £3.5 million on works and
direct purchases by South Lanarkshire Leisure and Culture. 
Approval is therefore sought to slip £4.9 million into financial year 2025/2026 to
reflect the revised profile of expenditure across financial years. 
£0.400m 
(£0.350m) 
(£4.900m)
Education Resources 
Universal Free School Meals 2024/25
Funding from the Scottish Government of £0.332 million has been confirmed to
support the phased expansion of free school meals in primary schools. The purpose
of this funding is to support school infrastructure, including school catering and
dining, ahead of further expansion of free lunches for primary school children. 
Approval is therefore sought to increase the 2024/2025 Capital Programme by
£0.332 million.   
Law Primary School Nursery Expansion
Approval is sought to increase the 2024/2025 capital programme by £0.200 million
for the adaptation of Law Primary School and School Nursery to increase nursery
registration numbers.   
The funding for this project will come from a Developers Contribution from the
Clydesdale area. 
£0.332m 
£0.200m  
TOTAL ADJUSTMENTS (£9.215m)            
22

Page 23

APPENDIX 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024 
£m  
Total Base Budget (including carry forward from 2023/2024) 87.007  
Transfers to Revenue – Sections 4.3-4.5 (1.000)  
Proposed Adjustments – Period 7 (9.215)  
Total Revised Budget 76.792     
2024/25
Budget 
Period 7
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 62.223 (8.544) 53.679
Education 9.042 (0.671) 8.371
Finance & Corporate 3.086 - 3.086
Housing & Technical 11.629 (1.000) 10.629
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 87.007 (10.215) 76.792         
23

Page 24

APPENDIX 3
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024 
2024/25
Original
Estimate
inc C/F 
2024/25
Revised
Budget 
2024/25
Forecast 
Spend 
2024/25
Forecast
Variance 
2024/25
Actual to
04/10/24      
Expenditure £m £m £m £m £m      
General Fund Programme 73.850 76.792 76.792 - 17.581 
Income
2024/25
Budget
2024/25
Revised
Budget  
2024/25
Actual
To
04/10/24         
£m         £m   £m
Prudential Borrowing 32.564 23.251   23.251
Developers Contributions 8.800 7.836   0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund, Cycling
Scotland, Transport Scotland and REF /
Wind Farms) 
0.958 5.233   0.446
Scottish Government:     
- Capital Grant 20.156 22.278   12.465 
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant)
1.440 0.000   0.000 
- Road Safety Improvement  0.000 0.497   0.000 
- Vacant and Derelict Land 1.793 1.793   1.368 
- Regeneration Capital Grant  2.170 2.170   0.997 
- Place Based Investment
Programme
- Universal Free School
Meals
0.727 
0.000
1.056 
0.332 
0.727
Shared Prosperity Fund 2.645 2.649   0.000
Levelling Up Fund 0.000 7.400   2.839
Capital Receipts 1.340 1.340   2.286
Specific Reserves 1.257 0.957   0.957
Revenue Contribution 0.000 0.000   0.000      
TOTAL FUNDING 73.850 76.792   45.336  
24

Page 25

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 4 OCTOBER 2024 
2024/25
Annual 
Budget  
2024/25
Forecast
Spend
2024/25
Forecast
Variance
2024/25 
Actual to
04/10/24 
£m £m £m £m
Expenditure 
2024/25 Budget  77.248  72.106  -  22.439     
2024/25
Annual 
Budget  
2024/25
Actual to
04/10/24 
£m   £m
Income         
Capital Receipts 0.000   0.265
Capital Receipts – Land Sales 0.000   0.000
Capital Funded from Current Revenue 33.506   13.815
Prudential Borrowing 23.677   2.563
Scottish Government Specific Grant:    
- New Build 16.945   5.311
- Open Market Purchase Scheme 3.000   0.000
- Mortgage to Rent 0.120   0.263
Other Income 0.000   0.222 
77.248   22.439 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (2 October 2024)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £5.839 million, detailed in appendices 1 and
2, be noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in appendices 1 and 2 of the report.  The
report details additional funding that has been reported by Resources as part of the
additional resources’ notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £0.218 million has been identified for 2024/2025.  This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £5.621 million has been identified for 2024/2025.  This is
detailed in Appendix 2. 
5.3. The total additional funding is therefore, £5.839 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval.  
5
27

Page 28

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
18 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 2 October 2024 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
28

Page 29

Appendix 1 
Additional Revenue Funding  
Resource  Description  2024/20
25
£m 
Total
£m 
Method
Housing
and
Technical
Ukrainian Resettlement – Support for local
authority resettlement teams – Funding
allocation 2024-2025 – Year 3 
Funding is to support integration of remaining
Ukrainian cohorts with full closure of welcome
accommodation in 2024-25.   
0.218 0.218 Scottish
Government 
TOTAL REVENUE FUNDING 0.218 0.218 
29

Page 30

Appendix 2 
Additional Capital Funding 
Resource  Description  2024/2025
£m 
Total
£m 
Method
Education  Free School Meal Expansion Programme 
To support the phased expansion of free school
meals to those in receipt of Scottish Child
Payment in Primary 6 and 7 from February
2025, as part of the free school meal expansion
programme in primary schools. 
0.332 0.332 Scottish
Government 
Housing
and
Technical
Place Based Investment Programme 2024/25 
The funding will be used for:
• Discover Lanark Outdoor Space – in
conjunction with Lanark BID to create a high-
quality outdoor seating area in Lanark.
• Coalyard - Town Centre Social Housing
development. 
0.589 0.589 Scottish
Government 
Housing
and
Technical 
Heat & Energy Efficient Scotland – Area
Based Schemes 2024/25 
The funding is to help councils develop and
deliver fuel poverty programmes (mainly solid
wall insulation) in parts of their area with high
levels of fuel poverty. 
2.976 2.976 Scottish
Government 
Housing
and
Technical
Affordable Housing Supply Programme 
2024-25 
The uplift in RPA should be directed towards
acquisitions to help address temporary
accommodation pressures or, where
appropriate, to bring long term voids back into
use. 
1.724 1.724 Scottish
Government 
TOTAL CAPITAL FUNDING 5.621 5.621 
30

Page 31

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Employee Workforce Monitoring Information - April to
September 2024 Summary 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period April to
September 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for April to September 2024 relating
to the Council be noted:- 
 attendance statistics
 occupational health
 accidents/incidents
 discipline, grievance and Dignity at Work
 employee development
 labour turnover/analysis of leavers and exit interviews
 recruitment monitoring
 Staffing Watch as at 14 September 2024
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, the following
monitoring information is submitted to the Executive Committee.  This report for the
Council provides information on the position for the period April to September 2024. 
4. Attendance Statistics
4.1. Information on absence statistics for April to September 2024 for the Council and
each Resource is provided in Appendices 1 – 8.  Points to note are:- 
 the Council’s average absence rate for April to September 2024 is 5.1%, an
increase of 0.4% when compared to the previous year
 the APT&C average absence rate for April to September 2024 is 5.2%, an
increase of 0.4% when compared to the previous year
 the teaching staff average absence rate for April to September 2024 is 2.5%, an
increase of 0.2% when compared with the previous year
 the manual workers’ average absence rate for April to September 2024 is 7.3%,
an increase of 0.7% when compared with the previous year
6
31

Page 32

A comparison of April to September 2024 to April to September 2023 (Appendix 8)
showed:- 
 psychological and musculoskeletal conditions are the main reasons for absence
 total days lost due to musculoskeletal conditions have decreased by 132 days
 total days lost due to psychological conditions have increased by 467 days
 total days lost due to stomach, bowel, blood and metabolic disorders have
increased by 2,516 days
 total days lost due to respiratory conditions have increased by 1,494 days 
5. Occupational Health
5.1. Information on Occupational Health for the period April to September 2024 is
provided in Appendix 9.   
 musculoskeletal and psychological conditions were the main reasons for
medical referrals, this remains unchanged from the previous year
 a total of 788 employees were referred for a medical examination and when
compared to the previous year this represents an increase of 130 employees
being referred
 a total of 965 employees attended physiotherapy treatment, which is an
increase of 11 when compared to the previous year.  Of the 965 employees
referred, 73% remained at work whilst undertaking treatment
 786 employees were referred to the Employee Support Officer, a decrease of
26 when compared to the previous year.  Of those referrals made during the
period, 89% related to personal issues
 324 referrals were made for counselling, this represents an overall increase of
19 when compared with the same period last year
 a total of 25 employees were referred for Cognitive Behavioural Therapy, an
increase of 15 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident report for the period April to September 2024 is contained in
Appendix 10.  During July and August there was a lag in reporting due to the
transition to Oracle Fusion and this is accounts for the lower number of accidents /
incidents recorded:- 
 the number of accidents/incidents recorded for the period was 495
 during the period there were 4 specified injuries/incidents
 during the period there were 466 minor accidents/incidents
 during the period the number of over 3 days injuries recorded were 7
 during the period the number of accidents resulting in an absence lasting over 7
days recorded was 18 
Due to a changeover in systems, data input has been delayed, therefore,
comparisons to last year is not possible.
32

Page 33

7. Discipline, Grievance, Dignity at Work
7.1. Information on Disciplinary, Grievance Hearings and Dignity at Work for the period
April to September 2024 is contained in Appendices 11,12 & 12b:- 
 during the period, a total of 71 disciplinary hearings were held across
Resources within the Council which represents an increase of 2 when
compared to April to September 2023.  Action was taken in 60 of these cases
and there were 2 Resource appeals raised against the outcome; these were not
upheld
 the target is to convene disciplinary hearings within 6 weeks.  During the period
72% of hearings met this target
 during the period, 6 appeals were submitted to the Appeals Panel; 2 were
upheld in part, 1 was not upheld and 3 were withdrawn
 at the end of September 2024, no Appeals Panels were pending
 overall, 5 grievances were raised during the period, an increase of 5 when
compared with the same period last year.  2 were resolved and 3 are currently
still in process
 there were 10 dignity at work incidents raised this period, an increase of 5 when
compared with the same period last year.  1 was resolved and 9 are currently
still in process.
 during the period 4 referrals for mediation were submitted, this figure is
unchanged when compared with the previous year 
8. Employee Development
8.1. Information on Employee Development for the period April to June 2024 is contained
in Appendices 13 and 13a.  As the report for retrieving training statistics from Oracle
Fusion is currently being developed, data for the period July to September 2024 is
not yet available:- 
 the Council is committed to ensuring that every employee has the opportunity to
undertake learning and development which relates to their job
 during this period there were 3,227 attendances at classroom learning and
development events.  There were also 507 attendances at virtual classroom
learning and development events
 as Learn on Line continues to develop, employees have successfully completed
27,512 e-learning packages covering a wide variety of subjects 
9. Labour Turnover/Analysis of Leavers and Exit Interviews
9.1. Information on the number of leavers and exit interviews for the period April to
September 2024 is contained in Appendix 14.  Exit interviews are conducted with
leavers who leave voluntarily. 
The Council’s labour turnover figure for April to September 2023 is 4.8% and this
figure has decreased by 0.3% when compared to the same period last year. 
9.2. Analysis of Leavers and Exit Interviews 
 during April to September 2024 there were 359 leavers eligible for an exit
interview
 46 exit interviews for were held during April to September 2024 
Given the transition to the new Fusion system, exit interview data continues to be
collated and updated for this period. 
33

Page 34

10. Recruitment Monitoring
10.1. Information on Recruitment Monitoring for the period April to September 2024 is
contained within Appendix 15.  From an analysis of Equal Opportunities Monitoring
forms, the main points to note are:- 
 99% of applicants completed an Equal Opportunities Monitoring Form, which is
an increase of 4% when compared with April to September 2023
 of the 177 applicants who declared themselves as disabled, 67 were
shortleeted for interview and 8 were appointed
 of the 601 applicants from a black/ethnic background, 106 were shortleeted for
interview and 14 were appointed
 of the 30 applicants who declared themselves as a Veteran, 9 were shortleeted
for interview and 1 was appointed 
11. Staffing Watch
11.1. Details of the number of employees in post at 14 September 2024 are contained in
Appendix 16.   
There were 15,726 employees in post as at 14 September 2024 compared to 15,242
as at 9 September 2023, an increase of 484 employees. 
12. Employee Implications
12.1. There are no implications for employees arising from the information presented in
this report. 
13. Financial Implications
13.1. All financial implications are accommodated within existing budgets. 
14. Climate Change, Sustainability and Environmental Implications
14.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report. 
15. Other Implications
15.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
16. Equality Impact Assessment and Consultation Requirements
16.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
16.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 October 2024
34

Page 35

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Executive Committee of 22 November 2023 
List of Background Papers
 Monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
35

Page 36

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.2 5.2 5.2 April 2.7 2.8 2.9 April 8.8 7.0 7.3 April 5.6 5.1 5.2
May 5.0 5.1 5.4 May 3.6 3.2 3.0 May 7.6 6.2 7.1 May 5.4 5.1 5.3
June 5.0 4.9 5.3 June 2.6 2.2 2.8 June 8.1 6.5 7.2 June 5.3 4.7 5.2
July 4.5 4.0 4.3 July 1.4 1.1 1.0 July 7.4 5.8 6.3 July 4.6 3.8 4.1
August 4.3 4.2 4.6 August 1.4 1.3 1.9 August 7.4 6.2 7.5 August 4.4 4.1 4.7
September 5.2 5.2 6.2 September 2.8 2.9 3.5 September 8.0 7.6 8.3 September 5.4 5.3 6.1
October 5.7 5.2 October 3.4 2.7 October 8.1 7.1 October 5.8 5.1
November 6.3 6.1 November 4.7 4.3 November 8.6 8.1 November 6.5 6.2
December 6.7 6.7 December 5.3 4.8 December 8.9 7.8 December 7.0 6.6
January 5.2 5.8 January 4.3 4.8 January 8.0 7.8 January 5.8 6.1
February 5.7 6.3 February 4.1 4.9 February 7.9 8.0 February 5.9 6.4
March 6.2 6.3 March 4.6 4.1 March 8.3 8.1 March 6.4 6.3
Annual Average 5.4 5.4 5.6 Annual Average 3.4 3.3 3.4 Annual Average 8.1 7.2 7.6 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 4.8 5.2 Average Apr-Sep 2.4 2.3 2.5 Average Apr-Sep 7.9 6.6 7.3 Average Apr-Sep 5.1 4.7 5.1
7363 4036 4452 15851
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Council Wide
APT&C Teachers
No of Employees at 30 September 2024 No of Employees at 30 September 2024
Manual Workers Council Wide
No of Employees at 30 September 2024 No of Employees at 30 September 2024 
36

Page 37

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 October 7.5 7.0 October 7.1 6.3 October 5.8 5.1
November 4.2 2.6 November 8.3 8.1 November 7.7 7.3 November 6.5 6.2
December 3.7 3.0 December 8.8 7.5 December 8.0 6.8 December 7.0 6.6
January 2.6 3.6 January 7.4 7.4 January 6.7 6.9 January 5.8 6.1
February 3.6 4.0 February 7.4 7.8 February 6.9 7.2 February 5.9 6.4
March 3.9 3.2 March 7.9 7.9 March 7.3 7.2 March 6.4 6.3
Annual Average 3.8 3.2 3.3 Annual Average 7.4 6.8 7.0 Annual Average 6.9 6.2 6.4 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.7 3.2 3.6 Average Apr-Sep 7.0 5.9 6.3 Average Apr-Sep 6.5 5.5 5.9 Average Apr-Sep 5.1 4.7 5.1
585 2876 3461 15851
Appendix 2
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
37

Page 38

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.0 5.4 April 2.7 2.8 2.9 April 4.0 3.8 4.0 April 5.6 5.1 5.2
May 5.5 5.4 6.0 May 3.6 3.2 3.0 May 4.5 4.2 4.4 May 5.4 5.1 5.3
June 5.1 4.8 5.5 June 2.6 2.2 2.8 June 3.7 3.4 4.1 June 5.3 4.7 5.2
July 3.8 3.4 3.2 July 1.4 1.1 1.0 July 2.5 2.2 2.0 July 4.6 3.8 4.1
August 3.6 4.0 3.9 August 1.4 1.3 1.9 August 2.4 2.5 2.8 August 4.4 4.1 4.7
September 5.8 5.9 6.6 September 2.8 2.9 3.5 September 4.1 4.3 4.9 September 5.4 5.3 6.1
October 6.5 5.5 October 3.4 2.7 October 4.8 4.0 October 5.8 5.1
November 7.9 7.1 November 4.7 4.3 November 6.2 5.6 November 6.5 6.2
December 8.5 8.1 December 5.3 4.8 December 6.8 6.3 December 7.0 6.6
January 6.1 6.6 January 4.3 4.8 January 5.1 5.6 January 5.8 6.1
February 6.8 7.2 February 4.1 4.9 February 5.4 6.0 February 5.9 6.4
March 7.0 7.5 March 4.6 4.1 March 5.7 5.7 March 6.4 6.3
Annual Average 6.0 5.9 6.1 Annual Average 3.4 3.3 3.4 Annual Average 4.6 4.5 4.6 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 4.8 5.1 Average Apr-Sep 2.4 2.3 2.5 Average Apr-Sep 3.5 3.4 3.7 Average Apr-Sep 5.1 4.7 5.1
3303 4036 7339 15851No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 3
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Education Resources
Council WideAPT&C Teachers Resource Total
38

Page 39

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 2.8 3.6 2.8 April 0.0 0.0 0.0 April 2.8 3.6 2.8 April 5.6 5.1 5.2
May 3.2 3.9 3.2 May 0.0 0.0 0.0 May 3.2 3.9 3.2 May 5.4 5.1 5.3
June 4.0 4.2 3.2 June 0.0 0.0 0.0 June 4.0 4.2 3.2 June 5.3 4.7 5.2
July 3.9 3.5 3.5 July 0.0 0.0 0.0 July 3.9 3.5 3.5 July 4.6 3.8 4.1
August 4.1 3.8 2.6 August 0.0 0.0 0.0 August 4.1 3.8 2.6 August 4.4 4.1 4.7
September 3.6 3.9 3.2 September 0.0 0.0 0.0 September 3.6 3.9 3.2 September 5.4 5.3 6.1
October 3.8 3.2 October 0.0 0.0 October 3.8 3.2 October 5.8 5.1
November 3.4 3.5 November 0.0 0.0 November 3.4 3.5 November 6.5 6.2
December 4.3 3.3 December 0.0 0.0 December 4.3 3.3 December 7.0 6.6
January 4.3 2.8 January 0.0 0.0 January 4.3 2.8 January 5.8 6.1
February 3.8 3.5 February 0.0 0.0 February 3.8 3.5 February 5.9 6.4
March 3.8 2.6 March 0.0 0.0 March 3.8 2.6 March 6.4 6.3
Annual Average 3.8 3.5 3.1 Annual Average 0.0 0.0 0.0 Annual Average 3.8 3.5 3.1 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 0.0 0.0 0.0 Average Apr-Sep 3.6 3.8 3.1 Average Apr-Sep 5.1 4.7 5.1
826 0 826 15851
Manual Workers
No of Employees at 30 September 2024
Resource Total
No of Employees at 30 September 2024
Appendix 4
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Finance and Corporate Resources
No of Employees at 30 September 2024 No of Employees at 30 September 2024
APT&C Council Wide
39

Page 40

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 5.5 5.7 5.3 April 10.6 6.9 7.2 April 7.6 6.2 6.1 April 5.6 5.1 5.2
May 4.5 4.9 5.2 May 8.1 6.1 8.1 May 6.0 5.4 6.4 May 5.4 5.1 5.3
June 4.9 5.4 5.7 June 8.5 6.8 8.4 June 6.4 6.0 6.8 June 5.3 4.7 5.2
July 5.5 5.0 5.3 July 8.9 8.1 8.6 July 6.9 6.2 6.7 July 4.6 3.8 4.1
August 4.7 5.1 5.5 August 7.1 8.5 8.8 August 5.7 6.4 6.9 August 4.4 4.1 4.7
September 4.5 4.7 7.5 September 6.3 7.8 7.4 September 5.2 6.0 7.5 September 5.4 5.3 6.1
October 4.3 4.9 October 7.8 5.2 October 5.8 5.0 October 5.8 5.1
November 4.6 4.8 November 7.8 6.7 November 5.9 5.6 November 6.5 6.2
December 4.4 5.1 December 7.2 7.4 December 5.6 6.0 December 7.0 6.6
January 4.5 4.4 January 5.5 6.0 January 4.9 5.0 January 5.8 6.1
February 4.4 5.2 February 6.2 6.3 February 5.1 5.6 February 5.9 6.4
March 5.3 5.3 March 6.8 7.2 March 5.9 6.1 March 6.4 6.3
Annual Average 4.8 5.0 5.4 Annual Average 7.6 6.9 7.3 Annual Average 5.9 5.8 6.1 Annual Average 5.7 5.4 5.6
Average Apr-Sep 4.9 5.1 5.8 Average Apr-Sep 8.3 7.4 8.1 Average Apr-Sep 6.3 6.0 6.7 Average Apr-Sep 5.1 4.7 5.1
858 555 1413 15851No of Employees at 30 September 2024No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
APT&C Manual Workers Council Wide
40

Page 41

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 6.2 6.5 6.5 April 12.6 9.4 8.8 April 8.3 7.4 7.3 April 5.6 5.1 5.2
May 5.7 5.8 5.8 May 10.1 8.4 9.5 May 7.1 6.6 7.0 May 5.4 5.1 5.3
June 5.9 5.5 6.0 June 11.3 8.6 9.2 June 7.6 6.5 7.0 June 5.3 4.7 5.2
July 6.0 5.4 6.5 July 11.8 8.8 11.2 July 7.9 6.5 8.0 July 4.6 3.8 4.1
August 6.0 4.8 6.9 August 10.8 8.6 11.4 August 7.5 6.0 8.4 August 4.4 4.1 4.7
September 5.9 5.6 7.2 September 9.6 9.3 12.0 September 7.1 6.8 8.8 September 5.4 5.3 6.1
October 5.8 6.5 October 10.4 8.5 October 7.3 7.1 October 5.8 5.1
November 6.0 7.3 November 10.4 9.0 November 7.4 7.8 November 6.5 6.2
December 6.4 7.4 December 10.6 9.5 December 7.7 8.1 December 7.0 6.6
January 5.2 7.0 January 12.0 10.3 January 7.4 8.1 January 5.8 6.1
February 5.8 7.0 February 11.0 9.9 February 7.5 7.9 February 5.9 6.4
March 7.0 7.1 March 10.9 9.4 March 8.2 7.9 March 6.4 6.3
Annual Average 6.0 6.3 6.8 Annual Average 11.0 9.1 9.9 Annual Average 7.6 7.2 7.8 Annual Average 5.7 5.4 5.6
Average Apr-Sep 6.0 5.6 6.5 Average Apr-Sep 11.0 8.9 10.4 Average Apr-Sep 7.6 6.6 7.8 Average Apr-Sep 5.1 4.7 5.1
1791 1021 2812 15851No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
Appendix 6
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Social Work Resources
APT&C Council WideResource TotalManual Workers
41

Page 42

Appendix 7
Community and Enterprise 1.8 4.1 5.9
Education 1.2 2.5 3.7
Finance and Corporate 1.2 1.9 3.1
Housing & Technical 1.9 4.8 6.7
Social Work 2.2 5.6 7.8
Council Overall for           
April - September 2024 1.6 3.5 5.1
Absence by Long and Short Term
From: 1 April - 30 September 2024
Resource Total
Absence %
Total Short
Term %
Total Long
Term %Resource
April - September 2024
42

Page 43

Reason Total Work Days Lost % of Work Days Lost
Psychological 31822 33
Musculoskeletal 21185 22
Stomach, blood, bowel and metabolic 10531 11
Respiratory 10875 11
Others 22374 23
Total Days Lost 96787 100
Reason Total Work Days Lost % of Work Days Lost
Psychological 31355 35
Musculoskeletal 21317 24
Stomach, blood, bowel and metabolic 8015 9
Respiratory 9381 10
Others 20205 22
Total Days Lost 90273 100
Appendix 8
From 1 April - 30 September 2024
From 1 April - 30 September 2023
Absence Classifications
Absence Monitoring 
43

Page 44

Appendix 9
Teachers Others
172 83 149 22 125 237
178 70 85 24 114 187
Apr-Sep 2023 Apr-Sep 2024 Apr-Sep 2023 Apr-Sep 2024 Apr-Sep 2023 Apr-Sep 2024
261 255 193 149 0 2
122 156 304 288 3 1
184 172 52 47 0 0
43 35 71 77 1 0
116 109 192 225 Social Work 2 2
228 238 812 786 Not Disclosed 4 20
954 965 Total 10 25
M S M S M S M S M S M S
Total (Apr-Sep 2024) 2 44 0 3 69 117 0 65 5 19 76 248
Total (Apr-Sep 2023) 62 0 0 0 183 0 14 0 46 0 305 0
Total 324
305
M = MANAGEMENT REFERRAL      S = SELF REFERRAL
Total Referrals (Apr-Sep 2024)   
Total Referrals (Apr-Sep 2023)   
Total
Analysis of Counselling Referrals by Cause
Reason
Work Stress Addiction Personal Anxiety/ Depression Bereavement Total
Finance and Corporate Housing and Technical Housing and Technical
Housing and Technical Social Work
Social Work Total
Education (Teachers) Education Education
Education (Others) Finance and Corporate Finance and Corporate
Resource Resource Resource
Community and Enterprise Community and Enterprise Community and Enterprise
Total (Apr-Sep 2024) 788
Total (Apr-Sep 2023) 658
No of Employees Referred For Physiotherapy No of Employees Referred To Employee Support Officer No of Employees Referred For Cognitive Behavioural Therapy
Occupational Health Reports
From: 1 April - 30 September 2024 comparison with 1 April - 30 September 2023
Medical Referrals
Community and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
44

Page 45

2023 2024 2023 2024 2023 2024 2023 2024 2023 2024 2023 2024
Total Specified Injury* 1 2 1 1 0 0 0 0 0 1 2 4
Total Over 7 Day** 10 14 8 0 0 0 3 2 5 2 26 18
Total Over 3 Day** 0 2 1 2 0 0 1 0 4 3 6 7
Total Minor*** 79 75 724 337 3 0 15 9 62 45 883 466
Total Finalised 90 93 734 340 3 0 19 11 71 51 917 495
Appendix 10
Analysis of Accidents / Incidents
From: 1 April - 30 September 2024 comparison with 1 April - 30 September 2023
Accidents by Month of Occurrence
Community and Enterprise Education Finance and Corporate Housing & Tech Social Work TOTAL
**Over 3 Day /Over 7 Day absence relates to events outwith the specified injury category that resulted in an absence or inability to do normal work for more than 3/7 days (not including day of injury)
***A minor injury is an injury not covered by  Over 7 day, Over 3 day or Specified
*Specified Injury is any fracture (other than fingers/toes), amputation, loss or sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/head injury, a chemical or hot metal burn to the eye or
penetrating injury as defined by the HSE
45

Page 46

APT&C Manual / Craft Teachers Total APT&C Manual / Craft Teachers Total
Total  (Apr-Sep 2024) 22 42 7 71 6 5 0 11 17 36 7 60 29 22 20 72% 71
Total  (Apr-Sep 2023) 7 59 3 69 1 5 1 7 5 39 18 62 44 15 10 86% 69
APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total APT&C Manual/ Craft Teachers Total
Total  (Apr-Sep 2024) 0 2 0 2 0 0 0 0 0 0 0 0 0 2 0 2 0
Total  (Apr-Sep 2023) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
From: 1 April - 30 September 2024
Appeal's Panel
Total 30
Appendix 11
Outcome of Appeals
Not Upheld
From: 1 April - 30 September 2024 comparison with 1 April - 30 September 2023
Appeals pending to date
Record of Disciplinary Hearings
No of weeks to convene Disciplinary Hearing
Total
0
% Held within
6 Weeks
No of Appeals
No Action
APT&C 4-6 6+3Teachers Total
No of Disciplinary Hearings
Upheld
APT&C
Upheld in Part
Teachers
Resource
Resource
Action Taken
Upheld Upheld in Part
Manual/ Craft
Outcome of Disciplinary Hearings
Manual/ Craft
3
Withdrawn
12
Not Upheld Total
Appeals
Pending
46

Page 47

Appendix 12
Record of Grievances
From: 1 April - 30 September 2024 comparison with 1 April - 30 September 2023
Grievances No of
Grievances
No Resolved
at Stage 1
No Resolved
at Stage 2
No Resolved
at Stage 3 Still in Process
Total (Apr-Sep 2024) 5 0 2 0 3
Total (Apr-Sep 2023) 0 0 0 0 0
Dignity at Work
From: 1 April - 30 September 2024 comparison with 1 April - 30 September 2023
Dignity at Work No of
Incidents
No Resolved
at Informal
Stage
No Resolved
at Formal
Stage
No of Appeals Appeals in
Process
Still in
Process
Total (Apr-Sep 2024) 10 0 1 0 0 9
Total (Apr-Sep 2023) 5 0 1 0 0 4
47

Page 48

Referrals for Workplace Mediation
Workplace Mediation Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24
No of Referrals 1 1 1 0 1 0
*No of Successful Cases 0 0 0 0 0 0
*No of Unsuccessful Cases 0 0 0 0 0 0
No of cases unsuitable for mediation 1 0 0 0 0 1
Workplace Mediation Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23
No of Referrals 0 2 1 0 0 1
*No of Successful Cases 0 0 0 0 0 0
*No of Unsuccessful Cases 0 0 0 0 0 0
No of cases unsuitable for mediation 0 1 0 1 1 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
As at September 2024
Appendix 12a
48

Page 49

Attended classroom based training
Community and Enterprise 525
Education 1224
Finance and Corporate 4
Housing and Technical 286
Social Work 1188
Total 3,227
Attended training delivered virtually
Community and Enterprise 24
Education 111
Finance and Corporate 12
Housing and Technical 81
Social Work 279
Total 507
E learning courses completed / passed
Community and Enterprise 4287
Education 8500
Finance and Corporate 1702
Housing and Technical 4773
Social Work 8250
Total 27,512
Employee Development
1 April - 30 June 2024
Appendix 13
49

Page 50

Percentage (%) Count
Male 29.3% 1165
Female 70.7% 2810
Disabled 0.7% 26
Not Disabled 80.3% 3122
Not Disclosed 4.3% 167
Not Entered 14.8% 575
White - Scottish 74.4% 2957
White - Other British 2.8% 113
White - Irish 0.5% 19
White - Any other Background 1.2% 48
Asian - Pakistani 0.1% 5
All Others 21.0% 834
21 Years 1.0% 38
21-29 Years 21.2% 841
30-39 Years 19.7% 784
40-49 Years 23.7% 944
50-59 Years 24.9% 988
60-65 Years 8.0% 317
Over 65 Years 1.6% 64
Finance and Corporate Resources
Appendix 13a
Employee Development
Monitoring Stats for all Training - 1 April - 30 June 2024
50

Page 51

Appendix 14
From 1 April - 30 September 2024
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 5 11 1 2 7 26 57%
Child Caring / Caring
Responsibilities 1 2 1 0 0 4 9%
Moving outwith area 0 3 0 0 0 3 7%
Personal Reasons 0 3 0 0 0 3 7%
Poor relationship with managers /
colleagues 0 1 1 0 0 2 4%
Travelling difficulties 0 1 0 0 0 1 2%
Further Education 0 1 0 0 0 1 2%
Other 2 2 0 2 0 6 13%
Number of exit interviews
conducted 8 24 3 4 7 46
Total no. of leavers per Resource
eligible for an exit interview 107 161 10 29 52 359
% of leavers interviewed 7% 15% 30% 14% 13% 13%
From 1 April - 30 September 2023
Number of exit interviews
conducted 28 42 6 9 32 117
Total no. of leavers per Resource
eligible for an exit interview 96 172 16 21 77 382
% of leavers interviewed 29% 24% 38% 43% 42% 31%
* Note these totals include temporary employees
Analysis of leavers and exit interviews
51

Page 52

Appendix 15
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
4867 1466 433 30% 9% 30%
1869 534 141 29% 8% 26%
2979 912 280 31% 9% 31%
177 67 8 38% 5% 12%
3826 1031 287 27% 8% 28%
991 405 130 41% 13% 32%
4066 1321 405 32% 10% 31%
601 106 14 18% 2% 13%
30 9 1 30% 3% 11%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
8809 3371 731 38% 8% 22%
3006 986 205 33% 7% 21%
5789 2002 488 35% 8% 24%
321 169 19 53% 6% 11%
6843 2310 502 34% 7% 22%
2283 791 195 35% 9% 25%
7651 2760 664 36% 9% 24%
1064 365 41 34% 4% 11%
84 42 3 50% 4% 7%
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 8809 (95%)
Total Number of posts recruited for: 1215
Total Number of appointments: 786
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
From : 1 April - 30 September 2023
Total Number of applications received: 9270
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total Number of posts recruited for: 588
Total Number of appointments: 466
Gender / Disability / Age
Total EO Forms Received
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 April - 30 September 2024
Total Number of applications received: 4930
Total Number of Equal Opportunities Monitoring forms received: 4867 (99%)
52

Page 53

Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3439 1244 384 235 1576 2471.12 5.00 1711.95 415.46 269.47 48.94 18.30 0.00 2.00 0.00
Education - Others 3255 104 95 587 2469 2530.85 5.00 1240.13 1087.44 137.72 48.60 11.00 0.00 0.96 0.00
Education - Teachers 4034 711 114 2177 1032 3600.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3600.11
Finance & Corporate Resources 822 183 24 366 249 730.03 8.00 93.90 341.81 210.36 53.96 22.00 0.00 0.00 0.00
Housing & Technical 1396 774 120 334 168 1284.40 3.00 196.94 674.12 365.25 33.09 10.00 0.00 2.00 0.00
Social Work Resources 2780 194 225 964 1397 2398.98 3.00 332.61 1455.57 508.52 64.77 33.51 0.00 1.00 0.00
9415.38 (excluding Teachers)
Total All Staff 15726 3210 962 4663 6891 13015.49 24.00 3575.53 3974.40 1491.32 249.36 94.81 0.00 5.96 3600.11
Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3140 1248 260 204 1428 2213.56 5.00 1535.63 371.38 236.50 44.05 16.00 0.00 5.00 0.00
Education - Others 3296 130 94 672 2400 2414.69 4.00 1185.77 951.66 144.40 49.60 10.00 0.00 62.46 6.80
Education - Teachers 3923 700 81 2235 907 3539.95 0.00 0.00 0.00 0.00 0.00 1.00 0.00 6.60 3532.35
Finance & Corporate Resources 841 196 15 400 230 761.82 8.00 111.26 357.34 213.64 50.28 21.30 0.00 0.00 0.00
Housing & Technical 1286 802 25 332 127 1228.24 3.00 205.10 623.16 357.38 29.60 10.00 0.00 0.00 0.00
Social Work Resources 2756 199 207 1004 1346 2411.06 3.00 350.14 1461.14 529.23 36.80 30.75 0.00 0.00 0.00
9029.37 (excluding Teachers)
Total All Staff 15242 3275 682 4847 6438 12569.32 23.00 3387.90 3764.68 1481.15 210.33 89.05 0.00 74.06 3539.15
Quarterly Joint Staffing Watch Return : Number Employed On 14 SEPTEMBER 2024
Analysis by Resource
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 9 SEPTEMBER 2023
Appendix 16
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
Analysis by Resource
53

Page 54

54

Page 55

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Chief Executive  
Subject: Community Plan Quarter 4 Progress Report 2023/2024
and Annual Outcomes Improvement Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Executive Committee of progress made against the outcomes within
the Community Plan 2022 to 2032 as at the end of March 2024
purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[
(1) that the progress made to date against the outcomes within the Community
Plan be noted (see Appendix 1); and
(2) that the content of the statutory Annual Outcomes Improvement Report (see
Appendix 2) be noted. 
3. Background
3.1. The South Lanarkshire Community Plan was approved in October 2017 and set
out the priorities and outcomes for the partnership.  A report setting out the new
Community Plan was approved by the Community Planning Partnership (CPP)
Board on 22 June 2022.  That report outlined a plan to meet the requirement to
publish a Local Outcomes Improvement Plan as required by the Community
Empowerment Act.  It was agreed that an Annual Outcomes Improvement Report
would be published alongside the Performance Progress report. 
3.2. This report outlines the progress made against the Community Plan up to the end of
March 2024.  It also provides an update on the Annual Outcomes Improvement Report
for 2023-24 as detailed in Appendix 2.   
4. Delivering the Community Plan
4.1. Critical to the successful delivery of the Plan is keeping the promise to work together
with communities, local organisations and businesses to deliver the ambitions set out
in the Community Plan.  To achieve these ambitions, we need to change how we
currently work together; taking a more holistic and joined up approach to service
delivery through re-imagining current service delivery models; and through developing
a clearer understanding of how our work impacts on individuals, families, communities,
local organisations and businesses; and the contributions that we make as a whole in
our work towards a fairer South Lanarkshire for all.   
4.2. Following agreement at the CPP Board on 13 December 2023, a CPP Board
Development Session focussing on Performance took place on 21 May 2024. 
Following on from this, a review of the Partnership’s priorities and approach to
7
55

Page 56

performance monitoring and reporting is underway and a new performance framework
will be developed.   
5. Progress to Date
5.1.  The principles underpinning the framework remain to ensure that the Partnership
Board receives clear performance reports which are produced to a common
timescale and a common standard across the Partnership. 
5.2. The outcomes within the Community Plan are reported in full within this Quarter 4
report, using the latest information available.  The report shows whether outcomes
are being achieved to facilitate change and progress against the associated
improvement actions.  It also highlights progress on specific outcomes to inform good
practice, learning and sharing across the Partnership.   
5.3. The report uses a “traffic light” system to indicate if there are any concerns about
whether a target will be reached or whether an action will be completed as intended. 
In general, a blue status indicates that the action to achieve change has been
completed.  A green status indicates that there are no concerns about meeting a
target or achieving an action.  Amber and red are used to flag up where there might
be slippage or deviation from plans.  The following definitions are used:-  
Status Definition
Blue The action to achieve change has been completed
Green On course to achieve the target or complete the action as planned/the
timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
To be
reported
later
For some measures, the statistics are not yet available to allow us to
say whether the target has been reached or not.  These will be
reported when available 
5.4. The Community Plan Outcomes Report
There are 76 measures within the Community Plan and the table below gives a
summary of the progress as follows:- 
Summary: 
Priority
Status by year
Total Blue Green Amber Red
Report
Later/Not
Available
23-24 23-24 23-24 23-24 23-24
Putting learning at the
centre 0 10 1 0 0 11
Our children and young
people thrive 0 14 2 0 0 16
Thriving businesses and fair
jobs 0 12 0 0 0 12
Caring, connected
communities 0 12 3 0 0 15
56

Page 57

Good quality, suitable
housing for everyone 0 11 1 2 0 14
People live the healthiest
lives possible 0 8 0 0 0 8
Total 0 67 7 2 0 76 
5.5. Of the 76 measures, 0 (0%) have been completed, 67 (88%) are judged to be on
course to achieve the targets set, while 2 (3%) is judged to be considerably off target
and a further 7 (9%) are judged to be slightly off target.  There are 0 measures (0%)
to be reported later.   
5.6. It is important to note that the data within the report does not always refer to the current
reporting year.  What is shown is the most recent data available, on the strength of
which a judgement is made about whether the targets set in the Community Plan are
likely to be achieved. 
5.7. There are seven amber measures and two red measures, and these are detailed
below with explanatory commentary and the partner action to improve the measure.     
Putting Learning at the Centre: We will work with and support people of all ages to help
them re-engage with education and learning or to improve their employability skills. 
Outcome: People experiencing barriers to employment are supported into sustainable work 
Action Measure Baseline 2023
Target
Latest Comments
Amber
Provide key
worker
based
employability
support and
learning to
targeted
groups. 
Increase the
percentage
of
employability
participants
progressing
to positive
destinations 
56.8% 60% 56.8% A total of 1,513 individuals
achieved a positive
destination (56.8% of total
engagements across all
projects). 
The 60% target has been
identified as achievable,
however, the Scottish
Government No-One Left
Behind (NOLB) approach to
funding means that effectively
only progression to
employment or college
learning can be counted as
positive destinations as there
are few training options
outwith NOLB funding.  This
is likely to reduce the
outcome rate and the target
may be reviewed.
Responsibility (Lead): Local Employability Partnership
Partner action to improve the measure
Following the Employability Review, the Advice Pro Management Information System which had
been used by the Youth Employability Team was partially rolled out to other programmes funded/
delivered by South Lanarkshire Council but did not capture all activity which means that the
baseline does not reflect all activity.  From 2024/25 all participants and destinations will be tracked
and reported through Advice Pro which will result in accurate reporting. 
57

Page 58

Our Children and Young People Thrive: We will work to ensure that the health and
wellbeing of children, young people and families is improved 
Outcome: Every child and young person should be able to access local community services
which support and improve their mental health and wellbeing 
Action Measure Comments
Amber
Deliver one
Mellow Bumps
Pregnancy
Session in
each locality in
partnership
with the Family
Support Hubs
By March 2024, 80%
of participants in the
Mellow Bumps
Pregnancy Sessions
will report increased
knowledge and
understanding about
stress, anxiety and
self-care
The Mellow Bumps programme is part of the
newly established parenting support group work
pathway delivered from the Family Support Hubs
(Lanark, Cambuslang, East Kilbride and
Hamilton).  The pathway has been introduced in
stages in year 1 of the Hubs and is not fully
operational with all programmes.  One barrier to
delivery has been trainer capacity.   
As no Mellow Bumps programme has been
delivered in full, collection and analysis of impact
measure data will be a priority for the first half of
year 2. 
A Mellow Bumps programme was delivered from
each of the four hubs in the first quarter of
2024/25 as planned.  Attendance rates varied
between hubs, groups tend to start with six
expectant mums, with all hubs experiencing a
level of drop out with the exception of 
East Kilbride.  Of those mums that completed the
programme feedback has been positive. The
hubs plan to run the programme again after the
summer and referrals are building again. 
The groupwork pathway, including Mellow Bumps
is reviewed regularly to ensure parenting support
groups are targeted to meet presenting needs of
those accessing the hubs and from info shared by
partners.
Responsibility (Lead): Children’s Services Partnership
Partner action to improve the measure
Priority in the coming months is to develop a full Mellow Bumps programme.  Collection and
analysis of impact measure data will be a priority for the first half of year 2. 
Outcome: Children and young people should grow up loved, safe, respected and listened to
Action Measure Comments
Amber
Test the
Throughcare
Mental Health
Pathway is offering
the correct level of
support for those
with low and
medium need
By March 2024, 75%
of young people have
been offered a low or
medium need mental
health support, report
it has improved their
mental wellbeing 
Test concluded at the end of March 2024,
with sustainable model being progressed
through the School Nursing Team. 102
referrals were made between August 2022 -
March 2024 (average 3.6 per month).  Of
these, 75% engaged with the service and
63% reported that the support has improved
their mental wellbeing.  
58

Page 59

Responsibility (Lead): Children’s Services Partnership
Partner action to improve the measure
Test of the Pathway concluded at the end of March 2024, and going forward the work will be
delivered via a sustainable model being progressed through the School Nursing Team. 
Caring, connected communities: We will continue to support and encourage every community
to identify and act on their local priorities 
Outcome: Communities feel empowered to identify and act on their local priorities 
Action Measure Comments
Amber
Fulfil statutory
Locality
Planning duties
to reduce
inequalities
within identified
priority
neighbourhoods
Work with local
communities in the
areas of Hamilton
South and East
Kilbride South to
identify local
priorities and
prepare a
Neighbourhood Plan
for their area
The Hamilton South Plan was submitted to the
Community Planning Partnership Board in
September 2024 for noting.  The stakeholders
have written an action plan which highlights what
improvements they would like to make between
June 2024 and March 2026.   
The East Kilbride Plan is still in development. 
Initial engagement has taken place and data
analysis has highlighted hidden issues of
inequality that have provided additional avenues
of investigation. 
Neighbourhood Planning community engagement
in the East Kilbride South area has been carried
out with the community views survey now being
completed. Development of the Stakeholder
Group is now a priority to build capacity.
Responsibility (Lead): Community Planning Partnership
Partner action to improve the measure
The East Kilbride Plan was delayed due to additional engagement work required in spring.  The
work is now assigned as a priority and the timescale for completion will be extended to the end of
2024. 
Outcome: Community volunteers feel that they can effectively participate in and contribute to
community planning at all levels 
Action Measure Comments
Amber
Develop and
deliver training/
awareness
raising activity
to ensure that
volunteers can
participate
effectively in
Community
Planning
Increase the
number of
volunteers in our
Neighbourhood
Planning
Stakeholder Groups
who feel confident
about their role in
Community
Planning through
capacity building,
training and support
Building community capacity and increasing
community participation continues to be a priority. 
Volunteering support and development work has
commenced to build capacity and support and
establish baselines for monitoring this progress. 
59

Page 60

Responsibility (Lead): Community Planning Partnership
Partner action to improve the measure
A range of new engagement approaches are being used to ensure that residents are contributing
on their own terms, in their own way and helping to bring the Neighbourhood Plans to life. 
Examples include the delivery of ACTIVATE which has catalysed the interest of local people, Let’s
Talk About online discussion, the use of the community HUB model and “community
conversations”. 
Membership in Stakeholder Groups has increased or stayed the same.  The Council’s Community
Engagement Team have yet to implement baseline reporting to monitor this.  The East Kilbride
Stakeholder Group requires further community development and input. 
Action Measure Comments
Amber
Upskill
employees in
participation and
engagement
approaches
Increase the
number of
employees who feel
more confident in
securing the
participation and
engagement of
individuals and
communities in their
work
The Community Planning Partnership Learning
and Development Plan Workstream Group have
produced a final draft of eLearning materials and
are meeting with the council’s Corporate Learning
Team to arrange upload onto the Learn on Line
platform.
Responsibility (Lead): Community Planning Partnership
Partner action to improve the measure
The membership of the Learning and Development Plan Workstream Group will be revised to
oversee the implementation of training materials across the workforce and communities. 
Good quality, suitable housing for everyone: We will increase affordable housing supply
and improve access to and choice of housing options that suit people’s needs 
Outcome: Increase overall housing supply and improve access to, and choice of housing
options, that suit people’s needs and are affordable 
Action Measure Baseline 2023
Target
Latest Comments
Amber
Deliver the
Council’s
Home+
Programme
Maintain the
percentage
of tenants in
Council new
build
properties
who are
satisfied with
their home
91% 91% 84% 226 tenants within 11 new
build housing sites were
surveyed with a 39%
response rate.  While the
overall satisfaction rate was
84%, in 3 sites 100%
satisfaction was achieved. 
60

Page 61

Responsibility (Lead): Housing and Homelessness Service
Partner action to improve the measure
Whilst there has been a slight decrease in overall satisfaction rate from respondents across the 11
new build sites surveyed, the majority of issues raised relate to the handover process rather than
the overall quality or type of home provided.  This includes cleanliness of home following
construction works and external finishes not yet completed at the point of handover. 
To improve this, key actions to be progressed by the Council’s Housing and Technical Resources
include: 
• Reviewing handover procedures to ensure appropriate time is provided to enable cleaning and
inspection of new build properties prior to tenants acquiring keys and accessing properties;  
• Reiterating service standards and contractual requirements to developers as part of new build
projects, including requirement for properties to be cleaned and ready for new tenants moving
in; and
• Ensuring new tenants are provided with the correct points of contact to report snagging issues
with their new home to allow timely resolutions.   
Good quality, suitable housing for everyone: We will work in partnership to prevent and
significantly reduce homelessness, and improve outcomes for those at risk of or who experience
homelessness 
Outcome: Prevent homelessness and improve outcomes for those at risk of or who experience
homelessness 
Action Measure Baseline 2023
Target
Latest Comments
Red
Deliver
Housing
Options
Service with
the aim of
preventing
homelessness 
Increase the
percentage of
Housing
Option
interventions
where
homelessness
is prevented
73.5% 70% 60.8% During 2023-24, 633
(60.8%) of homeless cases
were prevented. The
operating context in relation
to the prevention of
homelessness continues to
be extremely challenging
this year. The prevailing
socio-economic conditions
adversely impacted upon
the ability to prevent
homelessness during 2023-
24. This trend has been
mirrored nationally.
Responsibility (Lead): Housing and Homelessness Service
Partner action to improve the measure
The operating context continued to be very challenging throughout 2023/24 with preventing
homelessness becoming increasingly difficult due to external socio-economic factors including
ongoing increases in the cost of living, the shrinkage of the private sector and extreme pressures
on housing across tenures, limiting the availability of affordable housing options for individuals and
families.  Despite these difficult circumstances, Housing Services will continue to work in
partnership with partner agencies to deliver services which focus on the prevention of
homelessness, where it is possible to do so. 
The Housing Options Team continues to focus on identifying housing risk factors and delivering
interventions to prevent homelessness where possible.   
61

Page 62

Action Measure Comments
Red
Improve
access to
settled
accommodation
to homeless
households 
Continue to
implement the Rapid
Re-housing
Transition Plan
(RRTP)
Despite high levels of achievement against
several key measures within the RRTP, the
level of homelessness in South Lanarkshire
continues to increase to unprecedented levels. 
This is noted in the RRTP annual review and
mirrors trends across Scotland.  A range of
work is being progressed locally to help
mitigate the situation and the Resource
continues to engage with representative
groups, such as the Convention of Scottish
Local Authorities (COSLA) and Association of
Local Authority Chief Housing Officers
(ALACHO), to highlight the key issues which
require to be addressed at a national level.
Responsibility (Lead): Housing and Homelessness Service
Partner action to improve the measure
The increase in levels of demand for Homelessness Services has shown no sign of abatement
in the year and continues to challenge and adversely impact on the achievement of RRTP
objectives.  Locally, the Council is progressing a range of measures which aim to mitigate the
ongoing challenges including ongoing prioritisation of homeless applicants through
implementation of Local Letting Plans, delivery of practical and financial support to tenants to
sustain their tenancy, and a review of all homeless applicants personal housing plans.   
The unprecedented scale of the challenge has been recognised at a national level with the
declaration of a national housing emergency.  South Lanarkshire Council will continue to work
with local partners and representative groups at a national level to highlight the key issues
relating to homelessness which require to be addressed. 
5.8. Detailed progress against all outcomes and the related interventions contained within
the Community Plan is noted within the Quarter 4 Outcomes Progress Report at
Appendix 1. 
6. Key Achievements
6.1. Key achievements for 2023/2024 in relation to the priority themes, are highlighted
below:-
Priority Theme: Putting learning at the centre
Achievements: Lanark Young Reporters
The Young Reporters are a group of young people who wanted to learn new media and
technology skills as well as building a new, fun online presence for young people to express their
thoughts and discuss important topics that are close to their heart.  They came up with a podcast
called ‘The Lanark Universal Connections (UC) Podcast’ which they created, host, edit and
produce all themselves.  The ‘Lanark UC Podcast’ logo was designed by one of the group
members.  
The group have recorded in a professional recording studio with G4 Podcasting Studio as well as
attending Sky Up Academy to create their own news broadcast.  Over the weeks, they have
planned, recorded and released episodes onto Spotify and received fantastic feedback from
listeners.  The group have also taken their interviewing skills on different excursions including
visiting the Scottish Parliament to watch First Ministers Questions, as well as getting the
opportunity to film and interview ‘The Glasgow Clan’, an ice hockey team based in Glasgow. 
They have also had the opportunity to host their own shows on live radio in partnership with
community radio stations Avondale Radio and Listen Lanarkshire. 
Link to podcast: Lanark UC Podcast | Podcast on Spotify
Link to Glasgow Clan interview: https://www.youtube.com/watch?v=VzJXzChwQnM
62

Page 63

Achievements: Scottish Youth Parliament Elections 2023
Held every two years, the Scottish Youth Parliament elects young people to a national platform to
champion and progress issues facing young people across Scotland.  This round of elections saw
19 young people contest the five constituencies.  Members of South Lanarkshire Youth Council
and Youth, Family and Community Learning staff in partnership with secondary schools, colleges,
universities, and local youth groups, organised and delivered council wide elections, with over
7,500 votes being cast to democratically elect nine South Lanarkshire members of the Scottish
Youth Parliament. 
Outgoing Members of the Scottish Youth Parliament actively encourage participation of their
peers to progress local and national issues.  Success in achieving this has seen the development
and delivery of Education Psychology Services South Lanarkshire “Let’s Connect” Young
People’s Mental Health Conference, the launch of the Youth Strategy 2022 – 2025, participation
in the national Anti-racism in Education Reform Sub-Group, and participation in the South
Lanarkshire Community Planning Partnership Board development session on Climate and Nature
with members of the South Lanarkshire Youth Forum on Climate Change and Sustainability.
Priority Theme: Our children and young people thrive
Achievements: Children’s Rights and Voice
Children and young people have taken a leading role at a number of high-level conferences and
seminars, planning and delivering key messages that is ensuring that they are visible and listened
to by decision makers and budget holders.  The events include:
• A UNCRC themed seminar in November 2023 for 140 staff where young people, through a
film they made, set the agenda for staff discussion on their role in supporting children’s rights.
(Article 4 your rights are protected);
• An event to celebrate Care Day in February 2024, where young people from our Champions
Board hosted the event and challenged corporate parents to tell how they were keeping
South Lanarkshire’s Promise.  This event brought together at least 60 care experienced
children and young people and 60 corporate parents to improve the understanding and
visibility of each other.  (Articles 9, 20 and 21 the right to be cared for); and
• Our Wellbeing Warriors were at the heart of a conference in March 2024 helping to share
good practice in schools across South Lanarkshire to support emotional wellbeing.  The event
also helped highlight other important supports that were available to support children and
young people’s mental health and emotional wellbeing.  (Article 24 the right to health care).
Achievements: Counselling through schools
Children and young people across all our secondary schools are benefiting from support through
counselling made available in schools.  As a result of this support, almost all of the 480 pupils who
have told us about their experience said they were made to feel safe in counselling.  We have
been working to ensure a more consistent offer of support to pupils in secondary schools as part
of whole school support for mental health and wellbeing.  We met with counselling staff in all 17
high schools to talk about how the service links to wider supports across the community and have
identified areas where links could be improved, such as being more aware of and making better
use of the third sector support available and being more consistent in referring to available
support.  This will help us plan how we offer more connected support to children and young
people going forward.
Priority Theme: Thriving businesses and fair jobs
Achievements: Tackling Child Poverty Funded Programmes
The Council’s Employability Team, working in partnership with Routes to Work South, Clyde
Gateway and NHS Lanarkshire have increased the support available to unemployed parents
through a range of Tackling Child Poverty funded programmes.  This has included the expansion
of the Supporting Families Programme to communities in Larkhall and Clydesdale, the
development of the NHS Demonstrator, providing paid work experience to unemployed parents
and the expansion of the Making it Work programme to provide keywork support to parents with
barriers to employment.    
63

Page 64

Achievements: Business Support
The Council’s Business Support Team have supported 96 of our, (mainly small and micro)
businesses with grant funding totalling over £674,000, securing approximately 40% European
Regional Development Funding before UK access to EU funding ceased as part of Brexit.  This
funding supported the creation of 157 new jobs and safeguarded 490 existing jobs through growth
projects and business investment contributing to the transition to Net Zero.  With Lanarkshire
Business Gateway partners, 509 new business starts were supported in 2023-24.  Future funding
has been secured through the UK Shared Prosperity Fund to maximise future business support
grants to deliver on Small and Medium Enterprises (SME) jobs and business growth.
Achievements: Social Enterprise Strategy
The Council approved the South Lanarkshire Social Enterprise Strategy 2023-2027 in June 2023. 
Strategy priorities include stimulating social enterprise, developing stronger organisations and
realising market opportunity to shape ambitions and grow the sector in South Lanarkshire.  Direct
support to over 30 unique social enterprises, across a range of programmes was delivered via two
tendered Business Accelerator programmes, a small grants pot, a bespoke procurement
workshop delivered by the Supplier Development Programme (SDP) and a Climate Confident pilot
to support organisations along their net zero journey.
Achievements: South Lanarkshire Local Development Plan
In 2023/24, South Lanarkshire Council appointed Ryden LLP property consultants to provide a
series of employment land and property reports for the main areas within South Lanarkshire.  The
work was implemented in four parts to form a suite of reports that will inform the next Local
Development Plan (LDP3) and will support the Council’s wider planning, regeneration, and
property portfolio activities.   
The four reports, along with the overarching Summary Report consider the employment land and
property markets for:-
• East Kilbride;
• Hamilton, Blantyre and Larkhall;
• Clydesdale; and
• Cambuslang and Rutherglen. 
Each of the reports follows the same structure to enable comparison to be made and overarching
data to be compiled and key information includes:
• A strategic economic and planning policy context for the property markets;
• Core market analysis covering industrial and office property; 
• Assessment of employment land and development activity; 
• A review of funding sources for employment land; and 
• Identification of market potential and possible actions.
Achievements: Town Centre Master Planning
The master planning process for East Kilbride, Hamilton and the Town Centre Plan for Rutherglen
is well underway.  In developing these plans, the council is continuing to engage with local
businesses and communities throughout South Lanarkshire and has undertaken in-person and
online community consultation to further inform dynamic action plan(s) to address issues within
each of the various towns and deliver mixed-use town centres and innovative place making
solutions.
Achievements: Inward Investment
A South Lanarkshire dedicated Inward Investment Website has been developed to promote the
area to potential investors and developers from both within the UK.  The website ‘Invest South
Lanarkshire’ operates separately from the council’s main website with a distinct and separate
identity and brand and will go live early Summer 2024.  Invest South Lanarkshire is a ‘one stop
shop’ for investors and developers, demonstrating South Lanarkshire’s unique attraction for major
employers.  During 2023/24, a total of 144 inward enquiries for industrial/business land and
property were responded to.  
64

Page 65

Priority Theme: Caring, connected communities
Achievements: Climate and Nature Event
A Community Planning Climate and Nature Event was held on 24 October 2023 within the Council
Offices, Hamilton.  The event provided an opportunity for members of the Community Planning
Partnership (CPP), community groups and young people to find out how they could work together
and to take action to address the impacts of climate change. 
Key speakers were Laura Young (Less Waste Laura) who is an award-winning climate advocate
and environmental scientist and Alex Cameron-Smith of Sniffer, which is an environmental
charity, working across Scotland on the three key themes of leadership, placemaking and
innovation.  Various conversation cafes were also facilitated by local community groups and these
focused on the themes of: Green Travel; Communities in Action; Nature Based Solutions; Food
Growing; and Engagement. 
Students from South Lanarkshire College were also in attendance to record the feedback from the
speakers and conversation cafes.  Feedback from the event will be used to inform future
Climate/Nature actions for the partnership.
Achievements: Youth Voice and Participation in Community Planning
A Community Planning Partnership (CPP) Board Development Session was held with young
people on Climate and Nature, focussing on the issues facing young people locally and nationally. 
This took place at Holy Cross High School, Hamilton on 10 October 2023.  The session was led
by members of the South Lanarkshire Youth Council and the South Lanarkshire School Youth
Forum on Climate Change and Sustainability. 
The young people gave a comprehensive overview on a variety of topics including the preparation
for the Conference of Schools 1 (COS1); the waste pilot being carried out by Larkhall Academy
and Trinity High School, Rutherglen; update on the ‘Jump’ app project; Scottish Youth Parliament
activity; and the need for sustainability guidance. 
A further discussion took place on how the CPP Board can support young people, and how they
can create the space for further dialogue with the Board on what matters to them.  The next event
will take place in October 2024.
Achievements: Community Networking Event
As part of Challenge Poverty Week, a Community Networking event was held in Hillhouse and
Earnock Community Centre in Hamilton on Wednesday 4 October 2023.  Over 40 members of
the Financial Inclusion Network (FIN) attended the event to provide advice, support and promote
their services to residents.  The FIN members represent a wide range of services delivered by the
public sector and third sector and all four geographical areas of South Lanarkshire.  The next
event will be held during October 2024.  
Achievements: Burnhill – Our Place Our Plan
Burnhill Youth Activism Group have highlighted the issue of fly tipping and littering within their
community.  The young people decided to host a fly tipping and recycling campaign where they
distributed flyers to over 300 residents with useful information on how to access bulky uplifts, how
to recycle better, and upcycling ideas to reduce the amount of waste in their community.
They also hosted an event to promote the campaign and invited along local stakeholders
including residents, council services and community groups to bring together resources to tackle
the issue.  The young people shared their experiences of the issue and how it makes them feel
about their community. 
As a result, the young people have also worked in partnership with South Lanarkshire Council to
run a skip initiative; giving the residents of Burnhill an opportunity to dispose of any excess waste
responsibly.  
65

Page 66

Priority Theme: Good quality, suitable housing for everyone
Achievements: South Lanarkshire Council Market Purchase Scheme
A key part of the Council’s Affordable Housing Supply Programme is its Market Purchase
Scheme, enabling the Council to purchase existing homes from the private sector to provide
affordable council homes in areas of high demand. 
In 2023, the scheme was amended to provide more opportunities for the Council to purchase
homes from private owners, including landlords and those with empty properties.  Focus was also
given to advertising areas the Council needed certain types of homes in to help meet demand and
sharing this information with estate agents and property solicitors.   
These changes were a success, with 165 homes across all areas of South Lanarkshire purchased
through the scheme during 2023/24.  This significant increase on previous years supported the
council’s approach to housing need, providing more opportunities to find accommodation that
meets people’s needs in areas they wish to live.   
The 165 purchases added to the new homes built through the council’s Affordable Housing
Supply Programme in 2023/24, further increasing the range of affordable housing options across
South Lanarkshire and supporting those most in need to find long term, sustainable
accommodation. 
The Affordable Housing Supply Programme, including the Market Purchase Scheme, is funded
jointly by South Lanarkshire Council and the Scottish Government.
Achievements: Support to homeless households
In recent years there has been a continued increase in homelessness, both locally and nationally,
which has placed unprecedented demands on Homelessness Services.  Despite these signifcant
pressures, the council and its partners, continue to work together to prevent homelessness
occurring and deliver support services to those experiencing homelessness.
Housing First is an innovative approach that has been proven to help and support people with a
range of complex needs, out of homelessness.  Providing accommodation along with intensive
support, helps the individual to settle and manage a tenancy and allows them to focus on making
positive changes in other areas of their life. 
The Housing First service in South Lanarkshire is delivered in partnership by the council and the
Salvation Army.  The service provides a secure home and tailored multi-agency wrap around
support to people who are often the most vulnerable within communities. 
Staff arrange to meet those involved with the Housing First service frequently and stay in regular
contact with them.  The long-term aim is to build a trusting relationship between individuals in a
flexible, creative and needs based way that enables the delivery of a support package that fits
with each individual’s specific needs.   
Since the Housing First service began in 2019, 40 individuals have now been supported with
significant positive outcomes achieved, including an increase in independent living skills,
improved physical and mental health, reduction in drug and alcohol misuse, less offending
behaviour and improved motivation. 
Priority Theme: People live the healthiest lives
Achievements: Telecare Programme
Lanarkshire’s Technology Enabled Care (TEC) Team is an integrated Health and Social Care
Team aiming to empower Lanarkshire citizens to use technology to live their best lives, have
choice, control and reduce the risk of harm. 
The Telecare Programme refers to equipment and services which can support vulnerable citizens
to live more safely and well at home for longer. The TEC Team’s role includes the screening and
66

Page 67

approval of all requests for telecare and assistive technology, providing telecare advice, support
and training to Health and Social Care staff, patients, carers and other key stakeholders.  The
team also install consumer technology welcome packages in Blantyre LIFE’s technology enabled
homes, troubleshoot issues and support technology enabled homes. 
By December 2025, all analogue telephone services in the UK will be switched off and replaced
by digital systems using voice over internet protocol technology.  By March 2024, 6,580 digital
alert alarms have been installed, ensuring vulnerable citizens continue to receive a reliable and
safe community alarm service. 
Telehealth enables clinicians to monitor and manage people living with chronic conditions
remotely and helps patients to better understand and self-manage their health and wellbeing.
Blood pressure monitoring accounts for 74% of Connect Me activity.  This reduces the need for in-
person appointments and visits as well as saving patients’ time and money associated with
travelling to and from appointments.  The telehealth programme in Lanarkshire includes both Near
Me video consultations and Connect Me remote health monitoring.
Achievements: Community Nursing Service
Innovative work in communities continue to support people to live well at home.  This is an
important part of health and care delivery, particularly in the winter when pressure grows on
hospitals and indeed the whole system.  One vital element is the community expertise and
compassion allowing people to die in their own homes.  Lanarkshire’s award winning, end of life
dedicated Community Nursing Service (led by South Lanarkshire University HSCP) ensures end-
of-life needs are fully recognised by designating a lead member who takes time to review patient
needs and circumstances.  The team member then delegates clear responsibilities and patient
information with the team.  This approach ensures a comprehensive, consistent and
compassionate care strategy.  The team are available around the clock, with direct telephone
access for families and allows families to contact outside of planned visits to seek advice or
request additional support.
Having a single, specialist team means all record-keeping is centralised, allowing the entire team
to access patient information easily and rapidly.  This streamlined communication has ensured
everyone is informed about the patient’s wishes, condition, any changes or deterioration and
promoting the best possible care.  Patients and families are reassured by the consistent care
provided by the same core team members for all visits.  Trust is built over time, and families are
comforted by familiar faces and expertise. 
7. Annual Outcomes Improvement Report
7.1. A copy of the statutory Annual Outcomes Improvement Report is attached at Appendix
2 for noting.  This was approved by the CPP Board at their meeting on 18 September
2024 followed by publication on the CPP website by 30 September 2024.  The content
of the report is as follows:- 
• Section 1: Introduction to Community Planning in South Lanarkshire;
• Section 2: Our Ambitions – Delivery of the Community Plan;
• Section 3: Community Plan – Performance Highlights;
• Section 4: Community Plan: Overall Performance at a glance; 
• Section 5 - Places for Wellbeing: how we are making a difference:
- Thriving Businesses and Fair Jobs – Social Enterprise Strategy 2023-2027;
- Caring, connected communities – Climate and Nature;
- People live the healthiest lives – Telehealth and Telecare;
- Putting learning at the centre – Pathfinders programme for Young People;
- Our children and young people thrive – Family Support Hubs; and
- Good quality, sustainable housing for everyone – South Lanarkshire ECO4
Scheme.  
67

Page 68

• Section 6 - Working with Communities: How you can get involved:
- Community Participation and Engagement;
- Neighbourhood Planning;
- Community Partnerships;
- Sustainable Development and Climate Change;
- Community Led Planning;
- Participatory Budgeting;
- Volunteering;
- Community Asset Transfer; and
- Participation Requests.
• Appendix 1 – Links with the National Performance Framework;
• Appendix 2 – CPP Structure Diagram. 
8. Employee Implications
8.1. There are no employee implications associated with this report. 
9. Financial Implications 
9.1. There are no financial implications associated with this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
11. Other Implications
11.1. There are no risk or sustainability issues associated with the content of this report. 
12. Equality Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
Paul Manning
Chief Executive 
23 October 2024 
Links to Council Values/Priorities/Outcomes
 Links to all Council Values/Priorities/Outcomes 
Previous References
 Executive Committee – Community Plan Quarter 4 Progress Report 2022-23 and
Annual Outcomes Improvement Report – 22 November 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jen Kerr, Community Engagement Manager, South Lanarkshire Council
Tel: 07880 174955
Email: Jennifer.Kerr1@southlanarkshire.gov.uk
68

Page 69

-
Progress Report
Community Plan 2022-2032
Quarter 4 2023-24 (April to March) 
Appendix 1 7
69

Page 70

Summary - number of actions complete, green, amber, red and to be reported later  under
each Priority 
Priority areas of action 
Complete  Green
Status
Amber  Red
To be
reported
later
Total
Putting learning at the centre 0 10 1 0 0 11
Our children and young people thrive 0 14 2 0 0 16
Thriving businesses and fair jobs 0 12 0 0 0 12
Caring, connected communities 0 12 3 0 0 15
Good quality, suitable housing for everyone 0 11 1 2 0 14
People live the healthiest lives possible  0 8 0 0 0 8
Total 0 67 7 2 0 76 
Key: 
Statistical Measures 
Project Measures 
70

Page 71

Putting learning at the centre 
We will work with and support people of all ages to help them re-engage with education and learning or to improve their employability
skills 
Outcome: People experiencing barriers to employment are supported into sustainable work 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
A.1.1 Provide key
worker based
employability
support and
learning to
targeted groups
Increase the percentage of
employability participants
progressing to positive
destinations 
A total of 1,513 individuals
achieved a positive destination
(56.8% of total engagements
across all projects). 
The 60% target has been
identified as achievable, however,
the Scottish Government No-One
Left Behind (NOLB) approach to
funding means that effectively
only progression to employment
or college learning can be
counted as positive destinations
as there are few training options
outwith NOLB funding.  This is
likely to reduce the outcome rate
and the target may be reviewed.
Amber 56.8% 2023-24 56.8% 2023-
24 
60% 62% 65%  
71

Page 72

Ref Action Measure Comments Status
A.1.2 Provide targeted support to
adults facing barriers to
employment
Number of people supported into training,
education and employment
There have been 1,928 adults supported in the year
with 530 progressing into employment and 601
accessing further and/or higher education. 
Of the remaining adults, the Gateway to Employment
programme delivered by Routes to Work South, has an
increased focus on economically inactive adults and
those with long term health conditions resulting in
longer engagement and fewer job outcomes. 
Target 2023-24 – 1,000 into employment/training/
education; and
Target 2024-25 – 1,200 into employment/education/
training.
Green
A.1.3 Provide a range of 
employability programmes to
parents through the Tackling
Child Poverty funding
programme 
Number of parents/carers supported across the
six priority groups into training, employment and
education
335 parents have been supported across the six priority
groups, 58 have progressed into work and 46 into
training. 
The Lanarkshire Employment Partnership (LEP)
Tackling Child Poverty Group has developed and
reviewed the Parents Employability Programmes to
provide clear pathways across the three keyworker
programmes – Supporting Families, Making it Work and
Upskilling. 
Target 2023-24 – 100 into training/employment/
education; and
Target 2023-24 – 100 into training/employment/
education.
Green
A.1.4 Provide specialist
employability support to
young people and adults with
additional support needs
Number of young people and adults with
Additional Support Needs supported into
training, employment and education 
44 young people and adults with Additional Support
Needs have engaged in specialist programmes this
year and two have progressed into employment. 
2023-24 – Programmes were reviewed with full delivery
taking place from January 2024; and
2024-25 – 30 progressing into training/employment/
education.
Green
A.1.5 We will work with and support
people of all ages to help
them re-engage with
Learners will be offered opportunities to learn
skills that meet their needs across a range of
settings.  We will work with learners to:- 
As a result of Community Learning and Development
(CLD) work delivered by the Youth Family and
Community Learning Service (YFCL) across a range of
Green 
72

Page 73

education and learning or to
improve their employability
skills’ – are you happy for me
to add this again 
• Enhance their parenting skills
• Help parents to support their child’s learning 
education and community settings the following has
been achieved in 2023-24:
• 590 learners have enhanced their parenting skills;
and
• 171 learners are better able to support their child’s
curricular learning.
We will continue to support learners to progress
to other appropriate learning opportunities,
ensuring that we meet ongoing needs.  We will
work with learners to: 
• Help them re-engage with
education/learning 
• Help them access volunteering opportunities
• Help them access any other appropriate
learning programmes or opportunities
• Improve their employability skills
As a result of CLD work delivered by the YFCL Service
across a range of education and community settings
the following has been achieved in 2023-24:
• 743 learners have re-engaged with education/
learning;
• 243 learners are accessing volunteer opportunities
across the service;
• 593 learners have progressed to other appropriate
learning programmes/opportunities; and
• 735 learners have improved their employability
skills.
Green 
73

Page 74

Putting learning at the centre  
We will support young people to progress to further learning, work or training when they leave school 
Outcome: Young people will be supported to progress to sustained positive destinations when they leave school 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
A.2.1  Support young
people to
progress to
positive post-
school
destinations
Increase the School
Leaver Destination Rate
(SLDR) initial positive
destination rate 
The positive destination rate
continues to increase and South
Lanarkshire sits above the
national rate of 95.9% and 6th
highest of the 32 Local
Authorities.
Green 96.2%
(SLC) 
95.5%
(Scotland)
2020-21 96.9%
(SLC) 
95.9%
(Scotland) 
2022-
23 
97% 97% 97%
Decrease the gap in the
School Leaver Destination
Rate (SLDR) initial
positive destination rate 
The gap between the positive
destination rate for the most and
least deprived 20% datazones
has narrowed from 6.1% to 2.9%
and reflects a rate of 95.5% for
the most deprived compared to
98.4% for the least deprived.  The
national gap is 4.4%.
Green 6.1%
(SLC) 
4.4%
(Scotland) 
2020-21 2.9%
(SLC) 
3.7%
(Scotland) 
2022-
23 
2.9% 3% 3%
Increase number and
percentage of looked after
school leavers in a
positive initial and follow-
up destination by local
authority 
There are 85 young people in this
cohort classed as “care
experienced”.  The positive
destination rate is 92.9% for this
group of leavers, a slight increase
from the previous year and is
significantly higher than the
national rate of 87.9%.
Green SLC
Initial
92.5% 
Scotland
Initial
86% 
2020-21 SLC
Initial
92.9% 
Scotland
Initial
87.9% 
2022-
23 
93% 93.5% 94%       
74

Page 75

Ref Action Measure Comments Status
A.2.2 Deliver targeted support and
learning opportunities to
young people in the last 6
months of school through the
Aspire programme
Number of young people engaged on the
programme
The Aspire service has provided targeted keywork
support to 503 young people in 2023-24.  A range of
employability programme provision was delivered
including college-based vocational taster and
employability group work.
Green
A.2.3 South Lanarkshire Council
and Skills Development
Scotland will work together to
track the destinations of
young people aged 16-19
including regular home visits
Number of young people who did not
achieve/sustain a positive destination referred to
support through tracking and re-engaged 
The Employability Service tracked the initial
destinations of all South Lanarkshire leavers and
conducted a robust tracking exercise in collaboration
with Skills Development Scotland to identify and
engage young people who did not achieve/sustain a
positive destination.  In 2023-24, 91 young people were
successfully re-engaged through this tracking exercise.
Green 
75

Page 76

Our Children and Young People Thrive 
We will work to ensure children have the best start if life and become everything they can be 
Outcome: Every family should get the right support at the right time for as long as they need 
---BASELINE---            ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long 
(10yr)
B.1.1  Four Family Support
Hubs to promote a no
wrong door approach
and GIRFEC
Pathways with
community, third
sector and universal
pathways to be
strengthened
By March 2025, there
will be a 60%
reduction in new
referrals to Social
Work Resources
escalating to local
office allocations 
Social Work formally launched
locality-based Family Support
Hubs on 27 September 2022. The
Family Support Hubs are
community facing and accessible
provisions based in Hamilton,
East Kilbride, Lanark and
Cambuslang localities.  Families
are the second largest referrer to
the Family Support Hubs
In the past year, the Family
Support Hubs have responded to
61% of the total referrals. This
significantly decreases the
volume of initial assessments
being undertaken by Local Office
Teams and will create more
capacity within this part of the
system to respond to child
protection referrals.
Self-referrals are now the second
largest referrers to the Hubs.
Families are reporting
improvements in family wellbeing. 
Green 60% 2025 61% 2023-
24
60% TBC TBC 
76

Page 77

Ref Action Measure Comments Status
B.1.2 Family Group Decision
Making as a core
partner to Early Years
Multi Agency Service
By March 2024, 80% of families supported
will report improvement in involvement in
planning supports for their children and their
family
Family Group Decision Making (FGDM) is offered to all
pregnancy cases screened via EYMAS that are allocated for
assessment and intervention. Additional support from peer
support workers is also now available.  This support can be
offered to pregnant mothers and their partners when there
are drug and/or alcohol issues present.
A parent’s plan process as an alternative to pre-birth CP has
been tested in Hamilton Hub. This is now being scaled up
across all 4 Hubs. 
Outcome scales completed with families at the beginning and
the end of their engagement in FGDM indicates a 100%
improvement of all outcomes.  This measurement scale is
used with all families engaged in the support and data is
available. 
Green
Implementation of a Parents Plan to prevent
escalation to child protection
A parent’s plan process as an alternative to pre-birth CP has
been tested in Hamilton Hub. This is now being scaled up
across all 4 Hubs.
Green
B.1.3 Continue to refine and
consolidate the
Pathfinders approach
By March 2025, 60% of children and young
people accessing Pathfinders will report
improvement across three outcome
indicators
The Pathfinders Programme is currently embedded within 7
schools in South Lanarkshire, with 14 Youth, Family and
Community Learning Pathfinder Officer posts.  Currently,
Pathfinders are deployed in seven schools: Cathkin High;
Trinity High; Stonelaw High; Lanark Grammar; Calderside
Academy; St Andrew’s and St Bride’s, and Carluke High. 
This is funded through a mix of Whole Family Wellbeing
Funding (WFWF) and Pupil Equity Funding.  In 2023-24 the
programme set a target to engage with 350 young people and
families, providing support and sustained engagement that
meets identified needs. In total at the end of March 2024,
Pathfinders had worked with a total of 534 young people and
families, which exceeds our target by 52.5%. 
Pathfinder support is bespoke and provided through
individual and group support. Home visits and parental
engagement are key elements of the role.  Pathfinder staff
are well connected to key partners in the wider community to
ensure appropriate referrals into and out of the provision. 
Green
77

Page 78

The Pathfinders Team have successfully secured funding
from the UNCRC Innovation Fund to develop a youth led
consultation process that will allow young people to be the
catalyst for change in relation to areas that effect their lives.
This funding will support the further development of youth
voice in relation to developing appropriate interventions and
support and has enabled us to create rich opportunities for a
committee of 21 young people participating in the programme
to directly influence the service that they receive and be
involved and influence decisions effecting them/the
programme directly. 
This element of the programme has three distinct phases:-
1. Skills development – to allow the participants the
opportunity to develop the key skills and knowledge to
actively influence the programme and services they
receive.
2.  Consultation- the participants will develop and deliver a   
series of consultation events with their peer groups.
3.   Conference – young people involved will host a
conference for key partners, sharing life experiences,
barriers to participation and evidence of need to shape
future policies. 
Progress against measure: By March 2025, 60% of CYP
accessing pathfinders will report improvement across three
outcome indicators. 
Impact is recorded through agreed fixed CLD impact
measures that are reported directly through the South
Lanarkshire CLD Plan. In addition, a range of Pathfinder
specific progressive indicators have been developed to
record participation levels and impact. 
•   Target 5% increase in meaningful participation in school or
learning in their social skills.  Actual increase at year end
88%. 
•   Target 5% increase in young people who recognise a
positive adaptation in their behaviour, actual increase of
18%. 
78

Page 79

•   5% increase in young people who identify positive
development in their Health and Wellbeing 24%.
•   5% increase in meaningful participation in school or
learning.  Actual increase of 12%.
B.1.4 Test an improvement
approach to support at
least ten families with
children with disabilities
to cope with the
financial demands of
having a child/children
with disabilities
By March 2025, 80% of families supported
report an improvement in financial wellbeing
and at least one of the other targeted
outcomes
• Improved health and wellbeing;
• Reduced social isolation; and
• Increased engagement with education,
training or employment
Paths Away from Poverty is Funded by the Child Poverty
Action Fund and aims to support at least ten families with
disability through testing a bespoke support/navigator
relationship with families where a child or young person has a
disability and engages with parents and carers primarily.
Referrals are primarily from Education (schools) and from
NHS Lanarkshire to the third sector delivery partner –
COVEY. 
Outcomes and successes to date:
• The project is supporting 5 families with a number of
others in the referral pipeline.
• Improved financial wellbeing (2 referrals for urgent
financial wellbeing assessments).
• Improved health and wellbeing (links strengthened with
NHS colleagues, CAMHS, local GPs.  Regular contact
established with 3 families).
• Reduced Social Isolation (3 families moving to weekly
support; 1 young person referred for COVEY befriending
support with other additional needs young people).
• Increased engagement with education, training, or
employment (no evidence at this stage).
• The voice of families articulating what has changed for
them because of the support they have received
(families are choosing to engage and to receive support;
personal plans being co-produced.  More evidence
pending as test evolves).
• Evidence showing increase in benefits/entitlement (see
above referrals for financial wellbeing assessments – too
soon to evidence impact).
• Increased participation in community activity (see
reduced social isolation above).
Green
B.1.5 Four Family Support
Hubs to promote a no
wrong door approach
and GIRFEC Pathways
By March 2026, 80% of parents supported
will report improvements in family wellbeing 
Social Work formally launched locality-based Family Support
Hubs on 27 September 2022.  The Family Support Hubs are
community facing and accessible provisions based in
Hamilton, East Kilbride, Lanark and Cambuslang localities. 
Green
79

Page 80

with community, third
sector and universal
pathways to be
strengthened
Families are the second largest referrer to the Family Support
Hubs.
In the past year, the Family Support Hubs have responded to
61% of the total referrals.  This significantly decreases the
volume of initial assessments being undertaken by Local
Office Teams and will create more capacity within this part of
the system to respond to child protection referrals.
Self-referrals are now the second largest referrers to the
Hubs. Families are reporting improvements in family
wellbeing.
B.1.6 Health and Social Work
to work collaboratively
with parents to identify
strengths and areas for
improvement in relation
to neglect
Number of families completing the neglect
toolkit by March 2025 
103 Social Work staff have completed the Working with
Neglect Toolkit training.  Two more sessions are planned for
5 June and 2nd October 2024.  A Practitioner Forum is now
facilitated by the Child Protection Development Officer.  Local
offices and Family Support Hubs have introduced a reporting
system to capture toolkit usage.  Developments between
Social Work and Health Visiting staff are being considered to
scale up usage by introducing a targeted approach to toolkit
usage and learning taken. 
Consideration is being given to how to measure impact.
Green 
80

Page 81

Our Children and Young People Thrive 
We will work to ensure that the health and wellbeing of children, young people and families is improved 
Outcome: Every child and young person should be able to access local community services which support and improve their mental health and
wellbeing 
Ref Action Measure Comments Status
B.2.1 Deliver one Mellow
Bumps Pregnancy
Session in each locality
in partnership with the
Family Support Hubs
By March 2024, 80% of participants in the
Mellow Bumps Pregnancy Sessions will
report increased knowledge and
understanding about stress, anxiety and
self-care
The Mellow Bumps programme is part of the newly
established parenting support group work pathway delivered
from the Family Support Hubs (Lanark, Cambuslang, East
Kilbride and Hamilton).  The pathway has been introduced in
stages in year 1 of the Hubs and is not fully operational with
all programmes.  One barrier to delivery has been trainer
capacity.   
As no Mellow Bumps programme has been delivered in full,
collection and analysis of impact measure data will be a
priority for the first half of year 2. 
A Mellow Bumps programme was delivered from each of the
four hubs in the first quarter of 2024/25 as planned. 
Attendance rates varied between hubs, groups tend to start
with 6 expectant mums, with all hubs experiencing a level of
drop out with the exception of East Kilbride.  Of those mums
that completed the programme feedback has been positive.
The hubs plan to run the programme again after the summer
and referrals are building again.
The groupwork pathway, including Mellow Bumps is reviewed
regularly to ensure parenting support groups are targeted to
meet presenting needs of those accessing the hubs and from
info shared by partners.
Amber
B.2.2 Create and implement
training at informed
level to be delivered to
Children’s Services
staff through a Learn
Online module
By March 2024, at least 50 Children’s
Services staff will have accessed the Learn
Online module and reported an increase in
confidence in supporting children and young
people at risk of self-harm and suicide
A Learn Online course has been created and shared through
a variety of channels including the Education Sway, through
NHS Lanarkshire Health Improvement links and as a
precursor to in-person skilled level training.  89 South
Lanarkshire Council employees have accessed the Lifelines
Lanarkshire Learn Online module.  Of those who accessed
the training and provided feedback, all highlighted it as being
helpful and/or informative.
Green
81

Page 82

B.2.3 Key members of staff
who support children
and young people at
risk of self-harm and
suicide to attend
Lifelines Lanarkshire
training
By March 2024, at least 75% of staff who
have attended Lifelines Lanarkshire training
have shown an increase in confidence
supporting children and young people at risk
of self-harm and suicide following the
training 
Lifelines Lanarkshire skilled level training has been rolled out
across services, attended by key members of staff in
Education, Social Work, Health, and the Third Sector.
Resources have now been adapted to enable delivery as a
multi-agency training which has commenced.
173 staff across South Lanarkshire Children’s Services have
attended Lifelines Lanarkshire training.  92% of staff
attending the training reported an increase in confidence
supporting children and young people at risk of self-harm and
suicide.
Green
B.2.4 Continue roll out of
Kooth service and
increase the use of this
By March 2024, at least 80% of registered
users will report Kooth is effective in
supporting them with their emotional
wellbeing needs
An online digital support resource for young people called
Kooth has continued to be rolled out across South
Lanarkshire.  Presentations have been given at a number of
events such as the young person’s ‘Wellbeing Warrior’s
Conference’ whole school assemblies and a session is
planned for GPs.  Between April 2023 - March 2024, 848
young people used the support.  Over 90% of children and
young people who responded, reported that they would
recommend the service.
Green 
82

Page 83

Our Children and Young People Thrive
We will work to ensure that the life chances of children and young people in need of care and protection are improved 
Outcome: Children and young people should grow up loved, safe, respected and listened to     
Ref Action Measure Comments Status
B.3.1 In conjunction with care
experienced young
people develop ways
that make it easier for
them to participate in
the ongoing
improvement in key
decision-making
processes and capture
the impact of their
views and voices
70% of care experienced young people tell
us that they feel more able to participate in
key decision-making processes 
Young people have had many more opportunities to influence
change.  The Champions Board was relaunched in January
2024 with new members uptake.  The young people have
been involved in the Keeping the Promise thematic sub-group
and a forthcoming development session.  In addition, they will
be delivering and leading 2025 Care Day events. 
Corporate Parents have agreed to be more visible.  The
Champions Board are putting a schedule of engagement in
place including with the council’s Chief Executive.  In addition,
they are working closely with Housing officials, delivering a
bespoke housing protocol for care experienced young people.
Some young people are attending the Care and Prejudice
Social Work event to showcase the work of the Champions
Board. 
96% of young people visited within SLC units have been
involved in the consultation, co-production and delivery of the
suite of paperwork.  This is reviewed via the Champions
Board.  The feedback has proved positive where young
people fully included, with more opportunities for voice and
participation as well as the paperwork being less cluttered
with jargon and difficult language.
Green
B.3.2 Support young people
from 16 years old to
actively manage their
Child Trust Fund and/or
Junior ISA savings
account currently
administered by the
Share Foundation
70% of young people report they are better
informed about financial planning 
All care experienced young people are supported to budget
through advocacy support, the Promise Team and other
corporate parents.  This includes use of the Food Larder,
Savings, Money Matters, and Welfare Support within the Care
Hub. 
The local authority has identified unclaimed ISA’s, and is
working with Share Scotland to deliver the ‘Stepladder of
Achievement for 15-17 year olds (these courses are about
financial education).  There are 18 registered for the
programme.
Green
83

Page 84

£9,850 was shared amongst those completing courses.  4
completed all 6 courses, each gaining £1,500 for their Child
Trust Fund. 
9 have gained between £150 and £1,100 for completing part
of the course. 
Contributions have also been made to care experienced
young people’s Savings Accounts: (figures are only available
for Junior ISA accounts*) e.g.: 
• £1,500 has been added to 1 account of a young person
who has been adopted.
• £2,430 has been added to 5 accounts of young people
currently in care. 
SLC has supported young people through the Winter Wishes
initiative providing allowances over each of the last two years
(£40k per year in total) over the Winter period to help with the
cost of living challenges and in addition to set up allowance
top ups for young people gaining their own tenancy. 
All care experienced young people are supported to receive
financial help in the form of education and budgeting.  Money
Matters meet with the Care Hub on a regular basis and offer
drop-in sessions or bespoke contacts where appropriate. 
Almost all young people supported with managing their
finances report that they are better placed financially and
more informed as a result of the support received. 
B.3.3 Meet housing needs
through continued
development of Person-
Centred Pathway
Planning
By March 2024, 100% of young people will
have a Person-Centred Pathway Plan 
Heads of Service meet fortnightly to review Care Experienced
Young People (CEYP) on the Other Category Waiting List.
Monitoring information has been developed jointly between
Housing and Social Work Resources to reflect CEYP
Application Status and prospects of housing. 
Where a young person is identified as care experienced, they
are added to the Other Category Waiting List where
appropriate. 
Green 
84

Page 85

All CEYP to receive Person-Centred Pathway Planning to
engage with Housing throughout their journey.  A joint
Housing and Social Work Pathway Planning Protocol was
launched in January 2024. 
As at 31 March 2024, 100% of CEYP on the ‘Other Category’
list had a Pathway Plan in place.
B.3.4 Test the Throughcare
Mental Health Pathway
is offering the correct
level of support for
those with low and
medium need
By March 2024, 75% of young people have
been offered a low or medium need mental
health support, report it has improved their
mental wellbeing 
Test concluded at the end of March 2024, with sustainable
model being progressed through the School Nursing Team.
102 referrals were made between August 2022 - March 2024
(average 3.6 per month).  Of these, 75% engaged with the
service and 63% reported that the support has improved their
mental wellbeing.
Amber 
B.3.5 Provide targeted
support to care
experienced young
people to engage and
sustain participation in
South Lanarkshire
Local Employability
Partnership (SLLEP)
funded employability
programmes
By March 2024, establish a baseline
percentage of care experienced young
people engaging with SLLEP funded
employability activity progressing to a
positive destination 
57 care experienced young people participated in SLLEP
funded employability programmes.  87.5% progressed to a
positive destination of employment, learning (college etc) or
further training. 
The baseline going forward will be 65% progressing to a
positive destination. 
Green 
85

Page 86

Thriving businesses and fair jobs 
We will work to make sure everyone has the same opportunities to learn new skills 
----     
Outcome: People experiencing barriers to employment are supported into sustainable work                                                         B                                           -
=
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med 
(3yr)
Long 
(10yr)
C.1.1 Work with
employers to
progress people to
employment 
Number of
employability
participants
progressing to
employment 
623 participants across all
programmes have progressed
into employment in 2023-24. 
Green 623 2023-
24
623 2023-
24 
625 650 700             
Ref Action Measure Comments Status
C.1.2 Deliver sector-based
training to employability
participants
Number of people participating in sector based
training 
Sector Based Training via Routes to Work South
(RTWS) – 42 participants undertook sector-based
training and 13 progressed into employment. 
(Training undertaken included Site Health & Safety,
CSCS, HGV Training, Forklift and SIA Security).
Green
C.1.3 Provide in-work support
and training through the
Upskilling programme
Number of employed people engaging with the
Upskilling programme 
54 people engaged in the Upskilling Programme
during April 2023 until March 2024.  6 participants
completed training/qualification in areas of First Aid
and Forklift Training.  On completion, participants
would have received a wage increase, job security
and personal development. 
During 2023-24 the Upskilling Programme was
reviewed due to Scottish Government funding
changes and now provides a blend of training and
support to employed parents who require support to
increase their hours/rate of pay or find alternative
employment.  
Green
C.1.4 Work with employers to
identify vacancies for
progression for
employability participants
Number of new employer engagement contacts
developed and vacancies filled
A new Employer Engagement Team has been
established to lead and co-ordinate employer
engagement and support across the Employability
Service, to identify work placements and suitable job
progressions.  Just over 300 employers have
engaged, with approximately 315 vacancies filled.
Green 
86

Page 87

Thriving businesses and fair jobs 
We will ensure that the place where you live is at the heart of our response to the climate emergency and help places to become
sustainable 
----     
Outcome: Thriving town and neighbourhood centres provide a focal point for local communities                                                         B                                          
-               =
Ref Action Measure Comments Status
C.2.1 Complete the South
Lanarkshire wide town
centre visioning strategy
which will give a strategic
overview on the
engagement and
interventions with town
centres over the next 10
years, and a series of
town specific strategies
and action plans will sit
below this, giving a
template for placemaking
within our communities
Monitor and deliver town centre measures and
initiatives in line with town strategies, Community
Wealth Building and 20 Minute Neighbourhood
approaches.
• Town Centre Vacancy Rates – maintain at or
below national averages
• Businesses supported (including Social
Enterprise) – support across towns and places
South Lanarkshire Council are working with key
stakeholders across all our town centres to support
businesses and invest in projects and initiatives which
support the evolving way in which our towns are used
by local communities. 
In relation to vacancy rates, all our towns, except for
East Kilbride, are maintaining levels at or slightly
below the national average of around 14%.  The
council are seeking a move to more service-based
businesses and more local traders, which is an
encouraging trend and where possible are supported
through Business Support.   
Both East Kilbride and Hamilton contain shopping
centres which have lost anchor tenants over the past
year.  East Kilbride has vacancy levels (c30%) well
beyond the national levels and our own targets of
circa 12%.  Masterplan work to reduce retail space
and increase leisure and housing provision is
underway in both centres. 
During 2023-24, there were 1,246 unique businesses
supported, in key sectors, with the most prevalent
sectors including: manufacturing, construction and
engineering, and food and drink.  This figure includes
509 start-up businesses, significant in bringing in new
jobs and services to the South Lanarkshire economy.
Green  
87

Page 88

Thriving businesses and fair jobs 
We will make it easy for businesses and social enterprises get all available help and advice from one place 
----     
Outcome: South Lanarkshire is an attractive place to start, grow and locate a business                                                         B                                           -              
=
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med 
(3yr)
Long 
(10yr)
C.3.1 Number of new
South Lanarkshire
business starts
supported by
Business Gateway
(Locally set target) 
Total number of
businesses/social
enterprises supported
• New start-ups
Over 2023-24, the council’s
Business Support to new start-
ups delivered under the
Business Gateway (BG) brand
supported 509 unique start-up
businesses.  From February
2024, and following an options
appraisal, the BG contract was
brought in-house in February
2024 and is managed and
delivered by North Lanarkshire
Council as lead for BG across
the whole of Lanarkshire.  South
Lanarkshire Council has several
satellite locations where BG
staff operate from to ensure
reach and accessibility to
business/social enterprise
across South Lanarkshire.
Green 500 2023-
24
509 2023-
24 
500 N/A N/A
C.3.2 Number of business
support
interventions per
annum by
Economic
Development
(grants, loans or
advice)
(Locally set target) 
Total number of
businesses/social
enterprises supported
• Existing 
organisations
The council’s wider support
provided includes funding;
dedicated (but not limited to)
local business advisor support
to assist businesses and plan
for growth; access to expert help
on a range of relevant topics
including Finance; HR; Digital
Development and Marketing. 
737 unique businesses/social
enterprises were supported over
the last 12 months.  The council
and partners also delivered 8
Green 1,200 2023-
24
737 2023-
24 
1,200 N/A N/A
88

Page 89

events with 982 attendees
during this time across a range
of activity e.g. Lanarkshire
Business Excellence Awards,
Build Lanarkshire and Women
into Business etc.  The council’s
Business Team made 161
referrals to a range of council,
partner and external business
supports.  This figure is lower
than anticipated as it previously
included ‘new start-ups’
performance results, which is
now reported as a separate line.
Number and value of
grants 
South Lanarkshire Council’s
Business Recovery and Growth
Fund (BRGF) continues to
provide larger grants targeted at
existing Small and Medium
sized Enterprises (SMEs) to
support their strategic, longer-
term sustainability and growth. 
This grant funds specific
activities to help
businesses/social enterprises
adapt and grow via Capital
Expenditure, Infrastructure
Improvements, Training
Support, Consultancy Support
and Exhibition Support.  
The council’s Micro Grant has
had continued demand and
success with available grants up
to £3K match for businesses
and social enterprises.  Both
grant sources are now funded
under the new UK Shared
Prosperity Fund.  Over this
reporting period 96 grants in
total were awarded to the value
Green £723,000
(Made up
of ERDF
projected. 
£483,000
Plus
£180,000
SLC
monies,
plus
£60,000
UKSP)
2023-
24
96 grants
issued. 
Value
£674,273
2023-
24 
£723,000 N/A N/A
89

Page 90

of £674,273, this slight shortfall
in spend is due to the transition
over from European Regional
Development Fund (ERDF)
funding to UK Shared Prosperity
funding on a short hiatus due to
a change of funding criteria
which required a systems
update.
Grants awarded to
businesses/social
enterprises
• Funding 
leveraged 
South Lanarkshire Council
(SLC) grants are accessed
through an online application
form.  For the council’s micro
grant, a lighter touch application
is operated, with a quick
turnaround.  There continues to
be significant demand for both
the SLC Micro Grant and
Business Growth Funding and
during this period the grants
awarded levered in funding
totaling £1,641,754.  For every
£1 of council grant spent, £2.43
of additional funding has been
achieved.
Green N/A N/A £1641.754 2023-
24  
N/A N/A N/A
Total number of jobs
• Jobs safeguarded
As a direct result of South
Lanarkshire Council’s Business
Support 490 FTE jobs have
been safeguarded over 2023-
24.
Green 500 2023-
24
490 2023-
24 
500 N/A N/A
Total number of jobs
• Jobs created
As a result of the direct
Business Support on offer,
South Lanarkshire Council is
reporting 157 FTE jobs created
across South Lanarkshire in this
reporting period.
Green Included
in above
baseline
data
figure as
overall
target -
jobs
created/
sustained
2023-
24
157 2023-
24 
N/A N/A N/A
Total number of jobs
• Increase in           
Turnover
As a direct result of South
Lanarkshire Council’s Business
Support interventions, South
Green N/A N/A £14.5m 2023-
24 
N/A N/A N/A
90

Page 91

Lanarkshire Small and Medium
Enterprises (SMEs) have
increased turnover by
£14,495,539 in 2023/24. 
91

Page 92

Caring, connected communities 
We will continue to support and encourage every community to identify and act on their local priorities 
Outcome: Communities feel empowered to identify and act on their local priorities                                   
Ref Action Measure Comments Status
D.1.1 Ensure communities are
engaged and supported to
participate in local decision
making
Develop standards and a framework for the
planning, delivery and evaluation of place based
Participatory Budgeting programmes
Participatory Budgeting (PB) ran in all Neighbourhood
Planning areas in 2022/23, including Hamilton South
to act as a method for the development of the new
Neighbourhood Plan. 
In 2024/25, the council’s Community Engagement
Team will co-design a local evaluation model for place
based PB which will also consider the approach,
quality, outcomes and impact of this process.  This will
inform a framework and toolkit with local communities. 
They will also pilot more Third Sector delivery Place
Based PB.
Green
Strengthen the Neighbourhood Planning
Participatory Budgeting approach by co-producing
standards and a framework for the involvement of
young people
Work is progressing on the Neighbourhood Planning
Participatory Budgeting approach involving young
people.  Discussions are taking place on the
implementation of the UNCRC right to voice and youth
voice in the budget setting. 
The NHS are carrying out internal work on
implementing the UNCRC and a partnership working
group on youth voice has been established. 
An Engagement Partnership page has been
established on the CPP website and a review of the
South Lanarkshire Community Engagement and
Participation Strategy will commence in autumn 2024. 
Work is also progressing on involving young people in
the Community Partnerships and to encourage the
Community Partnerships to use the Lived Experience
Fund to gather the views of youths.
Green
D.1.2 Fulfil statutory Locality
Planning duties to reduce
inequalities within identified
Work with local communities in the areas of
Hamilton South and East Kilbride South to identify
local priorities and prepare a Neighbourhood Plan
for their area 
The Hamilton South Plan will be submitted to the
Community Planning Partnership Board in September
2024 for noting.  The stakeholders have written an
action plan which highlights what improvements they
Amber
92

Page 93

priority neighbourhoods  would like to make between June 2024 and March
2026.   
The East Kilbride Plan is still in development.  Initial
engagement has taken place and data analysis has
highlighted hidden issues of inequality that have
provided additional avenues of investigation. 
Neighbourhood Planning community engagement in
the East Kilbride South area has been carried out with
the community views survey now being completed.
Development of the Stakeholder Group is now a
priority to build capacity.
Evaluate the Neighbourhood Planning approach
for South Lanarkshire and implement
improvement actions
A review of the Neighbourhood Planning approach will
take place in 2023/24.
Green
D.1.3 Ensure children’s rights and
awareness of the United
Nations Convention on the
Rights of the Child
(UNCRC) is embedded in
the work of partner
organisations
Develop a UNCRC webinar to support the
understanding of children’s rights and the UNCRC
across the CPP workforce
A group of young people are designing and delivering
a filmed webinar for all public sector staff that provides
information on the UNCRC and what public services
need to do to ensure children’s rights are respected.
This training will be available on the council’s online
training platform and offered to all public sector
organisations.  This approach puts children and young
people at the heart of preparations for the UNCRC
(Incorporation) (Scotland) Act 2014 (Article 42 the
right to know your rights).
Green  
93

Page 94

Caring, connected communities 
We will bring communities together to share priorities and work jointly on them     
Outcome: Communities feel connected, share priorities and work together to create change                                                         
Ref Action Measure Comments Status
D.2.1 We will bring communities
together to share priorities
and work jointly on them 
Continue to develop and strengthen the
membership of the Hamilton and East Kilbride
Community Partnerships
Work continues to strengthen the membership of the 
Hamilton and East Kilbride community partnerships.
Governance arrangements including the Chair of the
partnerships have still to be agreed.
Green
Evaluate the Community Partnership approach
with Cambuslang and Rutherglen and Clydesdale
Community Partnerships and implement
improvement actions
There are plans for a self-evaluation and review of
future priorities, including group membership.  This
should be completed before December 2024. 
Processes for communication, monitoring, reporting
and evaluation will also be developed. Data profiles
will be developed for each locality. Training needs for
the partnership volunteers are currently being
identified, and a training plan will be devised and
delivered.  
Green
D.2.2 Young people will lead the
way on actions to tackle
climate change and nature
loss
Support young people to continue to develop their
leadership skills through engagement with the
Community Planning Partnership Strategic Board
on their Climate and Nature priorities
Following the success of an initial Development
Session with the South Lanarkshire Community
Planning Partnership Board and members of South
Lanarkshire Youth Forum on Climate Change,
Scottish Youth Parliament and South Lanarkshire
Youth Council, a dedicated annual development
session has been agreed to take forward to explore
issues and present ideas to progress action to tackle
climate and nature change.  The Development
Session supports the work and efforts of the wider
forums and presents the opportunity to develop key
skills and confidence of young people.
Green
Increase youth voice and influence in Community
Planning at a locality level through co-producing
an approach to youth participation
Work has been undertaken between Youth, Family
and Community Learning Service and Social Work to
facilitate young people's participation in locality
community planning through the youth participation
network, that supports young people to actively
explore and progress within the South Lanarkshire
Youth Council and the Scottish Youth Parliament. 
This process will see young people supported to
explore, identify and present issues and ideas at
relevant boards and forums.
Green
94

Page 95

D.2.3 Empower communities to
improve their own health
and wellbeing 
Progress the implementation of the South
Lanarkshire Age Friendly approach through the
development of an implementation plan and
supporting the Seniors Community to develop and
deliver on actions
Seniors Together in conjunction with the council 
continue to deliver Age Friendly Older People
Assemblies to engage with older people
representatives of groups and clubs across South
Lanarkshire to share plans to develop an Age Friendly
South Lanarkshire.   
The Leader of the Council provides an overview of the
vision at each of these events.  It is a requirement of
the World Health Organisation’s (WHO) membership
that there is commitment from the highest political
person within the local authority.   
An implementation plan has been developed and the
WHO checklists for each of the eight age friendly
domains will now be used as an engagement tool with
older people to assist in identifying an age friendly
standard for South Lanarkshire citizens.  A precursor
to this will be an engagement event on 5 September
2024, similar to an Older Peoples Assembly, with
colleagues from the council’s Planning and Building
Standards on the Local Development Plan 3.  Some of
the themes within the plan mirror the domains of an
Age Friendly Community.  
Green  
95

Page 96

Caring, connected communities
We will involve local representatives in community planning at all levels, including on the Community Planning Partnership Board 
Outcome: Community volunteers feel that they can effectively participate in and contribute to community planning at all levels 
People Thrive
Ref Action Measure Comments Status
D.3.1 Develop and deliver
training/awareness raising
activity to ensure that
volunteers can participate
effectively in Community
Planning
Increase the number of volunteers in our
Neighbourhood Planning Stakeholder Groups
who feel confident about their role in Community
Planning through capacity building, training and
support 
Building community capacity and increasing
community participation continues to be a priority. 
Volunteering support and development work has
commenced to build capacity and support and
establish baselines for monitoring this progress. 
A range of new engagement approaches are being
used to ensure that residents are contributing on their
own terms, in their own way and helping to bring the
Neighbourhood Plans to life.  Examples include the
delivery of ACTIVATE which has catalysed the
interest of local people, Let’s Talk About online
discussion, the use of the community HUB model and
“community conversations”. 
Membership in Stakeholder Groups has increased or
stayed the same.  The council’s Community
Engagement Team have yet to implement baseline
reporting to monitor this.  The East Kilbride
Stakeholder Group requires further community
development and input.
Amber
Increase the number of volunteers in our
established locality Community Partnerships who
feel confident about their role in Community
Planning through capacity building, training and
support 
Membership in the Clydesdale Community
Partnership has increased by over 25% in the last
year.  There is now 43 volunteers with all Community
Council areas having representation.  There has been
no change to the Cambuslang and Rutherglen
membership levels.  There are 17 volunteers and the
partnership is currently reviewing membership and
considering different methods of engaging the wider
community.    
The Partnership Community Development Officer is
working with both Community Partnerships to
complete a learning and development analysis to
better understand their needs and to create a plan to
Green
96

Page 97

deliver these activities. Enquiries are being made
about the process for the Community Planning
Partnership to obtain Volunteer Friendly status.  
Train 12 employees/community representatives
as Health in the Community (HIIC) Trainers and
support them to achieve accreditation
The Scottish Community Development Centre (SCDC)
hosted Health in the Community (HIIC) training on 
20 and 21 February 2024 where 12 trainers
participated.  This training is aimed at increasing
community capacity, consolidating community
development approaches to tackling inequalities in
health. 
This training highlighted the aims of the course; ideas
and guiding principles; learning objectives and
becoming a tutor. 
The participants will require to carry out live sessions
with various community groups across South
Lanarkshire to achieve their accreditations.
Green
Increase community representation on the
Community Planning Partnership Strategic Board
and provide youth voice opportunities
Three community members attend the Community
Planning Partnership Board representing, Clydesdale
and Cambuslang and Rutherglen Community
Partnerships and Seniors Together.   
The establishment of the Hamilton and East Kilbride
Community Partnerships is progressing.  Once the
governance arrangements and future priorities have
been confirmed, it is proposed that Chairs for each
Community Partnership will be confirmed. 
Young people are supported to explore, identify and
present issues and ideas at relevant boards and
forums including with the Community Planning
Partnership Board and Community Planning Events.
Green
D.3.2 Upskill employees in
participation and
engagement approaches
Increase the number of employees who feel more
confident in securing the participation and
engagement of individuals and communities in
their work
The Community Planning Partnership Learning and
Development Plan Workstream Group have produced
a final draft of eLearning materials and are meeting
with the council’s Corporate Learning Team to arrange
upload onto the Learn on Line platform.
Amber  
97

Page 98

Good quality, suitable housing for everyone 
We will increase affordable housing supply and improve access to and choice of housing options that suit people’s needs 
Outcome: Increase overall housing supply and improve access to, and choice of housing options, that suit people’s needs and are affordable 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
E.1.1  Deliver the
council’s
Home+
Programme
Increase the number of
council homes in South
Lanarkshire by 1,300
In total, 326 additional council
homes have been delivered
through the Affordable Housing
Supply Programme since the
council’s Executive Committee
established the 1,300 target on
30 November 2022.  This
includes 104 new council
properties and 222 purchased
from the open market.
Green 0 2022 326 2022-
24 
TBC 1,300
(by
March
2027)
TBC
Maintain the percentage of
tenants in council new build
properties who are satisfied
with their home 
226 tenants within 11 new build
housing sites were surveyed with
a 39% response rate.  While the
overall satisfaction rate was
84%, in three sites 100%
satisfaction was achieved. 
Amber 91%  2022-23 84% 2023-
24 
91% 91% 91%
E.1.2 Provide settled
accommodation
to households
experiencing
homelessness
Achieve the annual Local
Letting Plan target for
social rented properties
allocated to homeless
households
The 2023-24 annual target for
lets to the Urgent Housing Need
list, comprising majority
homeless households, has been
achieved. 
Green 55%-
65%
2023-24 63% 2023-
24 
55-65% TBC TBC   
Ref Action Measure Comments Status
E.1.3 Develop and implement the
Strategic Housing
Investment Plan (SHIP) 
Annual approval of SHIP by Housing and Technical
Resources Committee
The SHIP 2024-2029 was approved by the council’s
Housing and Technical Resources Committee on 
8 November 2023.
Green
E.1.4 Develop and implement
Local Letting Plans (LLP)
with proposed annual
targets
Annual approval of LLP targets by Housing and
Technical Resources Committee
LLP 2024-25 targets were approved by the council’s
Housing and Technical Resources Committee on
7 February 2024.
Green  
98

Page 99

Good quality, suitable housing for everyone 
We will work in partnership to improve housing quality and energy efficiency, whilst supporting a just transition to decarbonisation 
Outcome: Improve housing quality and energy efficiency whilst supporting a just transition to decarbonisation 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
E.2.1 Improve overall
energy
efficiency of
homes across
South
Lanarkshire 
Increase the average
Standard Assessment
Procedure (SAP) score of
all homes with an Energy
Performance Certificate in
South Lanarkshire
The SAP score has increased as
a result of the installation of
energy efficiency and
decarbonisation measures. 
Green     65.1 2021-22 67.0 2023-
24 
Increase
by 1% 
from
baseline 
70 TBC
Increase number of energy
efficiency and
decarbonisation measures
installed across private
homes in South
Lanarkshire utilising
national funding sources
In 2023-24, 161 privately owned
properties benefitted from a total
of 367 energy efficiency
measures being installed through
national funding sources.
Green 0 2022-23 367 2023-
24 
200 600 TBC
Increase number of energy
efficiency and
decarbonisation measures
installed in council homes
in South Lanarkshire
The council continues to deliver
its Housing Investment
Programme to improve the
energy efficiency of its properties
and reduce energy costs for
tenants. 
Element 35 of the Scottish
Housing Quality Standard
(SHQS) based on EESSH1
criteria is the only energy
measure currently being used,
95.39% of our stock pass the
standard, which equates to
24,559 properties. 
The council is awaiting guidance
from the Scottish Government on
the new Social Housing Net Zero
Standard, expected to be
published later in 2024-5 (it is
Green 0 2022-23 Data
availa
ble
June
2023-
24 
100 per
year
TBC TBC
99

Page 100

likely that this measure will be
revised following confirmation of
new national net zero standard
for social housing). 
Ref Action Measure Comments Status
E.2.2 Support the delivery of 
schemes to improve energy
efficiency in homes across
South Lanarkshire
Develop and implement the Energy Company
Obligation (ECO) Scheme
The ECO scheme was launched in South
Lanarkshire in July 2023.  A total of 333 energy
efficiency measures were installed in 127 properties
during 2023/24.
Green
Co-ordinate Energy Efficient Scotland: Area Based
Scheme funding (EES:ABS)
During 2023/24, 45 properties (34 private, 11 council
properties) were provided with external wall
insulation with the aim of improving thermal
efficiency and reducing the energy required to heat
homes.
Green 
100

Page 101

Good quality, suitable housing for everyone 
We will work in partnership to prevent and significantly reduce homelessness, and improve outcomes for those at risk of or who
experience homelessness 
Outcome: Prevent homelessness and improve outcomes for those at risk of or who experience homelessness     
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
E.3.1 Deliver Housing
Options Service
with the aim of
preventing
homelessness 
Increase the percentage of
Housing Option
interventions where
homelessness is prevented 
During 2023-24, 633 (60.8%) of
homeless cases were prevented.
The operating context in relation
to the prevention of
homelessness continues to be
extremely challenging this year.
The prevailing socio-economic
conditions adversely impacted
upon the ability to prevent
homelessness during 2023-24.
This trend has been mirrored
nationally.
Red  73.5% 2021-22 60.8% 2023-
24 
70% TBC TBC
Increase the percentage of
former homeless
households provided with a
council tenancy that
maintain their home for
more than 12 months
Tenancy sustainment has
remained strong this year and
the target has been achieved.
Green 88% 2022-23 92% 2023-
24 
TBC TBC TBC
Reduce repeat instances of
homelessness 
The performance is within the
target.  All repeat homelessness
cases are reviewed to identify
patterns and to inform future
development and delivery of
services.
Green 4.5% 2021-22 3% 2023-
24 
3% TBC TBC 
Ref Action Measure Comments Status
E.3.2 Improve access to settled
accommodation to
homeless households
Continue to implement the Rapid Re-housing
Transition Plan (RRTP) 
Despite high levels of achievement against several
key measures within the RRTP, the level of
homelessness in South Lanarkshire continues to
increase to unprecedented levels.  This is noted in
the RRTP annual review and mirrors trends across
Scotland.  A range of work is being progressed
Red
101

Page 102

locally to help mitigate the situation and the
Resource continues to engage with representative
groups, such as the Convention of Scottish Local
Authorities (COSLA) and Association of Local
Authority Chief Housing Officers (ALACHO), to
highlight the key issues which require to be
addressed at a national level. 
102

Page 103

People live the healthiest lives possible 
We will ensure that all of our services work with people as early as possible to stop problems happening 
Outcome:  People are able to look after and improve their own health and wellbeing and live in good health for longer 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
F.1.1 We will continue
to support
people to
improve their
own health and
wellbeing and
exercise choice
and control
Number of people
participating in a co-
produced Self Directed
Support Assessment to
exercise choice and
control over their care
In Quarter 4, 1,014 co-produced
assessments were approved, and
473 new co-produced
assessments commenced.  An
increase in both measures is
noted when compared to the
Quarter 3, 2023-2024 position. 
To date, there has been a total of
3,459 co-produced assessments
approved and 1,565 new co-
produced assessments
commenced exceeding the
annual target of 3,000.
Green 2,984 2022/23 3,459  2023-
24 
3,000 3,100 3,200             
Ref Action Measure                    Comments                               Status
F.1.2 We will continue to
establish a Community
Led Support approach
to promote to promote
positive health and
wellbeing outcomes
and community
resilience
Number of employees trained in Community Led
Support approach across all localities 
Supported by Health Improvement staff, 362 Health and
Social Care staff participated in Community Led Support
(CLS) training.
Green
F.1.3 We will promote self –
care and self-
management including
technology enabled
care
Increase in the number of people supported by
Technology Enabled Care to manage their own health
and wellbeing
Lanarkshire’s Technology Enabled Care (TEC) Team
continues to provide an integrated approach to
sustaining people to live independently at home and
within their community.  It supports and facilitates
hospital or integrated care discharges and may also be
urgently requested as part of Adult Support and
Protection planning or end of life care.  The two main
programmes of work include Telecare (South
Lanarkshire only) and Telehealth (pan-Lanarkshire) such
as the Connect Me remote health monitoring service,
Green
103

Page 104

and Near Me video consultations.  
Demand for assistive technology has continued to
increase during 2023-24 with 13% of hospital discharge
requests supported through the Home First pathway
during March 2024, whilst 63% were installed to improve
safety and reduce the risk of harm.   
The transition of alert alarms from analogue to digital
continues to make good progress with 227 digital alert
alarms installed in March 2024, bringing the total number
of installations to 6,580.  A priority focus for the team is
in terms of sustainability, where alarms are no longer
required by service users.  The target is to ensure the
team is identifying 70 alarms per month that can be
recycled and reused.  To date, 965 digital alert alarms
have been returned/uplifted and reused saving £156,330
on the cost of replacing these alarms.  
104

Page 105

People live the healthiest lives possible 
We will increase access, activities and supports that help improve mental health and addictions 
Outcome: People, including those with disabilities or long-term conditions, or who are frail, are able to live, as far as reasonably practicable,
independently and at home or in a homely setting in their community 
---BASELINE--- ---LATEST---  ---TARGETS---
Ref Action Measure Comments Status Data Period Data Period  Annual Med
(3yr)
Long
(10yr) 
F.2.1 We will continue
to protect adults
at risk from
harm 
Percentage of statutory
supervising officer visits
completed within
timescale for local
authority welfare
guardianship orders 
In Quarter 4, there was a total of
54 local authority welfare
guardianship visits due with 94%
(51) being completed on time.  A
decrease in this quarter is noted
when compared with the Quarter
3, 2023-24 position of 98%,
however, the target of 90% has
still been achieved.  To date,
there was a total of 251 local
authority guardianship visits due
with 94% (237) being completed
on time.  This remains the same
when compared to Quarter 3
2023-24. 
Green 93% 2022/23 94% 2023-
24 
90% 90% 90%
Percentage of statutory
supervising officer visits
completed within
timescale for private
welfare guardianship
orders
In Quarter 4, there was a total of
499 private welfare guardianship
visits due with 95% (474) being
completed on time.  An increase
in this quarter is noted when
compared with the Quarter 3
2023-24 position of 91%, target
of 90% has been exceeded.  To
date, there was a total of 2,293
private guardianship visits due
with 92% (2,108) being
completed on time.  This is an
increase when compared to the
Quarter 3, 2023-24 position of
91%.
Green 93% 2022-
23
92% 2023-
24 
90% 90% 90%  
105

Page 106

Ref Action Measure                    Comments                               Status
F.2.2 We will continue to
protect adults at risk
from harm 
Implement MAT standards across all localities  Medication Assisted Standards (MAT) are a set of
nationally agreed evidence-based standards to enable
the consistent delivery of safe, accessible, high quality
drug treatments across Scotland.  They were produced
in response to the emergent public health crisis by the
Drug Death Task Force.  The standards are relevant to
people and families accessing or in need of services
and Health and Social Care staff responsible for the
delivery of recovery orientated systems of care.  There
are a total of ten standards which services are working
to fully implement.  Progress on the implementation of
the MAT standards continues across all localities with
the focus for 2024 to ensure MAT standards 1 to 5
were implemented fully and embedded with the local
service and this has been achieved with all five
reporting a green rating. 
Green 
106

Page 107

People live the healthiest lives possible 
We will provide high quality day-to-day health and social care services that are accessible to everyone in our community who needs
them 
Outcome: Health and Social Care Services are centred on helping to maintain or improve the quality of life of people who use those services 
Ref Action Measure                    Comments                               Status
F.3.1 Implement Discharge
Without Delay to return
people to their home or
community safely 
Embed Home First approach across localities to
optimise independence of those discharged from
hospital/prevention from hospital admission 
The Care at Home Service has been augmented by
the addition of four Home First teams based within
each locality.  The teams use a re-ablement
approach, working with Allied Health Professional
(AHP) colleagues to optimise independence of
service users over a 6 week period and enable them
to remain in their own homes, prevent hospital
admission, or receive support immediately after
discharge from hospital.  During the fourth quarter of
the year, those in receipt of Home First support
required 44% less care at the end of their
intervention.  Performance has increased from 40%
in Quarter three and continues to exceed the 25%
target.
Green
F.3.2 We will support carers
to maintain their caring
role through a personal
outcome approach
Number of new carers supported  • 1,398 new carers identified in South Lanarkshire;
• 1,161 adult carer support plans progressed; and 
• 3,533 carers engaged and were supported.
Green 
107

Page 108

108

Page 109

South Lanarkshire
Community Planning Partnership 
Working together to improve the quality of life for all in South Lanarkshire 
Community Plan 
for South Lanarkshire 
2022-2032 
Annual Outcomes Improvement Report
2023-24 
Appendix 2
7
109

Page 110

Contents 
Chapter Page
Number
Introduction to Community Planning in South Lanarkshire
• Preface 
• What we are?
• Who we are?
• What are we trying to achieve?
• How do I get involved?
3
Our Ambitions
• Delivery of the Community Plan 
4-5
Community Plan
• Performance Highlights 
6
Community Plan
• Overall Performance at a glance 
7-8
Places for Wellbeing: 
how we are making a difference
• Thriving Businesses and Fair Jobs 
• Caring, connected communities 
• People live the healthiest lives possible 
• Putting learning at the centre 
• Our children and young people thrive
• Good quality, sustainable housing for everyone 
9-21
Working with Communities:
how you can get involved  
• Community Participation and Engagement 
• Neighbourhood Planning 
• Community Partnerships
• Sustainable Development and Climate Change 
• Community Led Planning 
• Participatory Budgeting 
• Volunteering 
• Community Asset Transfer 
• Participation Requests 
22-36
Appendices
• Links with the National Performance Framework
• Community Planning Partnership Structure
37-38
110

Page 111

Section 1 - Introduction to Community Planning in South Lanarkshire 
Preface
This document is for you, and everyone else who lives or works in South Lanarkshire.  It shows the progress of the South Lanarkshire Community Planning
Partnership during 2023-24 and gives example of the work that we are doing to make a difference; and how this has impacted on local people and
communities. 
What are we?
All our Community Planning Partners are working together to make South Lanarkshire a better place to live and work.  We work with each other and with
communities to provide the best possible services that local people want and need.  Further information can be found on the Community Planning
Partnership website www.southlanarkshirecommunityplanning.org. 
Who are we?
Our partnership includes a wide range of national and local organisations. Some of these organisations you will know well.  Our community partners lead
on local planning and area-based Community Partnerships.  A full list can be found on our website.  
What are we trying to do?
Our Community Planning Partners are working together to make South Lanarkshire a better place to live, learn, play and work.  Our aim is to work with
communities to deliver better services targeted at reducing poverty and tackling inequalities and deprivation across South Lanarkshire.
Further information can be found on the Community Planning Partnership website www.southlanarkshirecommunityplanning.org. 
How do I get involved?
There are many ways to get involved in your local community and influence the work of the partnership, for example, through volunteering, joining a local
action group, helping to find out what matters in your area or getting involved in how decisions are made.  More information can be found on the
Community Planning website www.southlanarkshirecommunityplanning.org/info/74/getting_involved. 
111

Page 112

Section 2 – Our Ambitions 
Our Ambitions
Our Community Plan sets out how we will continue to support the people living in our communities to participate in Community Planning and puts the
places where our communities live at the centre of change.  We will continue to focus on improving how we work better together to deliver local needs and
priorities. 
This work will happen across three key ambitions: People; Progress; and Planet. 
People – Together, we will take a people first approach to improving everyone’s wellbeing.  People told us that empowerment comes from the community
and it’s not something that is given to them.  We understand that long-lasting change will only be achieved if we all work together, putting our communities
at the heart of community planning.  We will continue to have community conversations that matter.  We will work with communities to ensure that their
voices are heard and support them to act on the things that are important to them through a “Can Do” approach.  
Progress – Together, we will build on what we have learned to improve how we do things and the wellbeing of everyone.  Delivering the right things that
matter to people, in the right place and at the right time.  We have been inspired by the phenomenal community response to the global pandemic and have
seen how our communities “Can Do” do more with the right information and support from us.  Our focus will be to continue to grow and develop the
relationships and the excellent partnership working that has supported our communities to maintain and improve their wellbeing throughout the pandemic.
Planet - Together, we will act in ways that protect our natural world for a healthier future.  We will work together to develop local solutions to protect nature
and to take action on climate change and support our young people to lead the way.
The ambitions set out where we want to see change happening across the themes of Progress, People and Planet.  From your feedback, we know that
there are six other priorities that are important to you.  We are already working to improve services in these areas and have plans that show how this is
being done.  Our Places for Wellbeing model shows how the plan connects though place, ambitions and priorities.   
112

Page 113

You can read the full Community Plan on the Community Planning website:
www.southlanarkshirecommunityplanning.org/info/1/what_is_community_planning/135/our_priorities.
113

Page 114

Section 3 – Community Plan Performance Highlights 
There is a significant amount of work being undertaken in our communities, and by our partners across South Lanarkshire to make places fairer, better and
greener.  This report highlights some of the work that has been done.     
The following are examples of key areas of work.   
• Thriving Businesses and Fair Jobs: 490 Full Time Equivalent (FTE) jobs have been safeguarded over 2023-24 as a direct result of South Lanarkshire
Council’s Business Support.
• Caring, connected communities:12 employees from across the partnership participated in the Health in the Community (HIIC) Training hosted by The
Scottish Community Development Centre (SCDC) and will work with communities to deliver what they have learned.    
• People live the healthiest lives possible: 1,398 new carers identified in South Lanarkshire.
• Putting learning at the centre: 1,928 adults were supported into work (530 adults) or further/higher education (601 adults).  The remaining adults
continue to be supported to find work or further/higher education opportunities. 
• Our children and young people thrive: 57 care experienced young people participated in the South Lanarkshire Local Employability Partnership (SLLEP)
funded employability programmes with 87.5% progressing to a positive destination of employment, learning (college etc) or further training.
• Good quality, sustainable housing for everyone: 326 additional council homes have been delivered through the Affordable Housing Supply Programme. 
114

Page 115

Section 4 – Community Plan Overall Performance at a glance 
The following provides a summary of our performance against our priority measures.  These are:- 
• Putting learning at the centre
• Our children and young people thrive
• Thriving businesses and fair jobs
• Caring, connected communities
• People live the healthiest lives possible
• Good quality, sustainable housing for everyone 
The full CPP performance report can be accessed using the following link: www.bit.ly/CPP2324Q4ProgressReport 
Status of priority measures 
xxx  67 Improved or Maintained                   9 Slippage or Deteriorated 
Status Definition
Blue The action to achieve change has been completed
Green On course to achieve the target or complete the action as planned/the timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall against target
Red There has been major slippage against timescale or major shortfall against target
To be reported later For some measures, the statistics are not yet available to allow us to say whether the target has been reached or not. 
These will be reported when available 
Most improved measures  Least improved measures
Number of young people and adults with Additional Support Needs
supported into training, employment and education
Increase the percentage of employability participants progressing to
positive destinations
By March 2024, 100% of young people will have a Person-Centred
Pathway Plan 
By March 2024, 80% of participants in the Mellow Bumps Pregnancy
Sessions will report increased knowledge and understanding about
stress, anxiety and self-care
Number of new employer engagement contacts developed and vacancies
filled
By March 2024, 75% of young people have been offered a low or
medium need mental health support, report it has improved their
67 7 2 0 0
115

Page 116

Most improved measures  Least improved measures
mental wellbeing
Increase number of energy efficiency and decarbonisation measures
installed in council homes in South Lanarkshire
Increase the percentage of Housing Option interventions where
homelessness is prevented
Number of people participating in a co-produced Self Directed Support
Assessment to exercise choice and control over their care
Continue to implement the Rapid Re-housing Transition Plan (RRTP) 
116

Page 117

Section 5 – Places for Wellbeing: How we are making a difference 
Thriving Businesses and Fair Jobs – Social Enterprise Strategy 2023-2027 
Why is this important?
44 South Lanarkshire Social Enterprises engaged and participated in a range of programmes including the South Lanarkshire Business Accelerator and
Climate Confident South Lanarkshire pilot. 
Targeted support to start up and grow Social Enterprise is a key priority for South Lanarkshire Council (SLC), who approved the South Lanarkshire Social
Enterprise Strategy 2023-2027 in August 2023.  This support outlined in the strategy, supplements, and adds value to the council’s existing Business
Support Programme.  
Many of our Social Enterprises are micro businesses (a very small company with less than 10 employees), often reliant on grant funding and the range of
issues they face are broad and complex.  Social Enterprises are businesses (albeit ones where the profit is to be reinvested into the business) where the
aim of support is to ensure that they become and remain a sustainable business that can compete to win business in the open market.   
According to the most recent Scottish Government Social Enterprise Census (2021) there are 177 Social Enterprises operating in South Lanarkshire.  The
estimated Gross Value Added (GVA) by South Lanarkshire active Social Enterprises in 2021 was £35.2mn.  This represents 13.3% Scottish Social
Enterprises GVA in 2021.  Social Enterprises are local employers and in 2021 employed 1,280 Full Time Equivalent employees – 1.4% of the Scottish total. 
Key sectors where Social Enterprises are active here in South Lanarkshire are Childcare and Early Years, Health and Care and Arts and Creative
industries. 
How are we doing?
A Steering Group made up of third sector partners, SLC and NHS Lanarkshire oversees the successful delivery, monitoring, and reporting against the
strategy objectives.  The strategy priorities align with the national strategy priorities for Social Enterprise, SLC Economic Strategy and the council’s
Community Wealth Building approach.  Taking this partnership approach, the council has delivered a range of capacity building and additional business
support programmes including: 
Following a successful pilot in 2022/23, council officers working with partners have commissioned two Business Accelerator Programmes aimed at building
business growth and sustainability of organisations. 
Procurement Workshop – this half day workshop in partnership with the Supplier Development Programme introduced organisations to public sector
tendering and how they can do business with the council. 
South Lanarkshire Social Enterprise Network – SLC resourced the development of a refreshed South Lanarkshire Social Enterprise Network to encourage
networking, peer support and provide an opportunity for meaningful engagement and collaboration across the sector. 
117

Page 118

Climate Confident South Lanarkshire Pilot – a series of bespoke interventions including the opportunity for organisations to receive expert help, peer
learning and access to a digital tool, aimed at supporting organisations to take significant steps towards net zero and positive climate action. 
Social Enterprise small grants – match funding to start and/or increase income through trading and work towards sustainability through income generation. 
Grants available up to 50% of eligible project costs (excluding VAT) and up to a maximum total grant award of up to £2.5k for single organisation applicants
and up to £7.5K for consortia applications. 
Priority Next Steps
There are several key areas of work underway to directly support the sustainability and growth of local Social Enterprise.  Delivering on the objectives set
out in the South Lanarkshire Social Enterprise Strategy going forward, we will: 
• Explore delivery of a Young Entrepreneur’s Programme in all secondary schools in South Lanarkshire;
• Test new forms of democratic finance and pilot a Community Bond Initiative;
• Build on the work that has taken place with colleagues in the Improvement Service on Shaping Places for Wellbeing and pilot a Community Wealth
Building Exchange in the Cambuslang/Rutherglen areas to build supply chain opportunities with Social Enterprises; and 
• Deliver a range of additional capacity building and business support e.g. workshops, events, and programmes. 
What people have said about the Business Accelerator Programmes:
“I just want to thank you for the delivery of the Leadership Programme.  I have found it immensely useful at exactly the right time for me.  The mix of group
discussion and theoretical sessions to underpin the 1:1 coaching has been of great value”. 
“I have found the experience to be quite revelatory!  Both in the communicating with peers about shared issues, to the real deep thinking the sessions…”.
“The Programme has exceeded my expectations.  I wasn't sure what to expect coming into this but I'm really enjoying it.  Not only the Expert’s knowledge
but also how the group has been facilitated in a way that creates safety for everyone to share.  The 1-1 was brilliant”. 
Further information 
• Support for Business - Social Enterprise Support   
118

Page 119

Caring, connected communities – Climate and Nature 
Why is this important?
The Community Planning Partnership through working with and supporting communities, aims to ensure in its work that steps are taken to mitigate and
adapt to the impacts of climate change and nature change whilst ensuring that no one is left behind.  As well as rapidly reducing greenhouse gas emissions
(known as ‘mitigation’), it is also important to improve resilience to the unavoidable impacts of climate change (known as ‘adaptation’).  The United Nations
Sustainable Development Goals (SDGs) is the framework which the partnership uses to track and monitor progress.  These are a comprehensive set of
global goals to end poverty, protect our planet, and improve living conditions for all.  Achieving each goal depends on the success of another, for example
ending poverty and reducing inequalities must go hand in hand with a healthy economy, whilst protecting the planet.  Making sure no one is left behind is
critical to the success of delivering on the SDGs.  To create stronger, more resilient communities, and support transformational change, residents,
community groups, organisations and businesses across South Lanarkshire need to be at the heart of climate and nature change. 
How are we doing?
Community based climate and nature activity during 2023/24, included, increasing the awareness of all of the SDGs including through Community Planning
events. 
In the lead up to national Climate Change week in September/October 2023, staff visited local community groups and volunteers, businesses,
schools/college, an eco farm and a cycle park to learn about the amazing work that they are doing in and around communities across South Lanarkshire
and to share their stories with the wider community.  You can learn more here: Climate and Nature Community Action stories.   
Members of the South Lanarkshire Youth Council and the South Lanarkshire School Youth Forum on Climate Change and Sustainability invited Community
Planning leaders to learn more about the climate and nature issues facing young people locally and nationally.  These issues included topics such as
reducing, reusing and recycling; fast fashion; transport; education; and social media.  The young people also shared some of the excellent work that they
are doing at school and where they live to tackle some of these issues such as Conference of Schools (COS) events; waste recycling pilots in High
Schools; a mobile phone app project; and further exploration of travel and travel habits. 
As part of the national Climate Change week and Tackling Poverty week, a community-led event which focussed on ‘Having Climate and Nature
Conversations that Matter’ was held.  Community groups and schools from across South Lanarkshire shared their stories with the wider community through
various conversation cafes which focused on the themes of green travel, communities in action, nature-based solutions, food growing and engagement. 
Key speakers were Laura Young (Less Waste Laura) who is an award-winning climate advocate and environmental scientist and Alex Cameron-Smith of
Sniffer, which is an environmental charity, working across Scotland on the three key themes of leadership, placemaking and innovation.  Those attending
were asked to submit a personal pledge.  These highlighted the need for a stronger focus on doing more locally, through community led action and
personal actions to reduce our impact on the environment.  Commitments included the following themes: air quality and emissions; education; energy; food;
greenspace; nature and biodiversity; recycling; resilience; transport and waste. 
Students from South Lanarkshire College were also in attendance for the purposes of furthering their studies and using their skills to develop a pictorial
representation of the discussions and learning from the day as shown below. 
119

Page 120

Priority Next Steps
• The council’s Youth Family and Community Learning Team will support young people to continue the dialogue on what matters to them about Climate
and Nature with Community Planning leaders.
• The partnership will continue to work with communities to deliver on the “Planet” ambition set out in the Community Plan, and the Partnership’s
commitment to ‘invest in our planet by putting local areas at the centre of our work’ and ‘to work together to develop local solutions to protect nature and
to take action on climate change and support young people to lead the way’.  This includes a key area of work to co-produce and co-deliver actions with
our communities.   
Further Information
• Community Planning Partnership - Community Planning Events
• South Lanarkshire Community Learning and Development Partnership
• South Lanarkshire Council - Sustainable Development and Climate Change Strategy 
Graphic by South Lanarkshire College Students 
120

Page 121

People live the healthiest lives possible – Promoting early intervention, prevention, and health improvement -
Telehealth and Telecare 
Why is this important?
South Lanarkshire University Health and Social Care Partnership is committed to promoting early intervention, prevention, and health improvement so that
people can remain independent and live their healthiest life possible.  Innovation and change play a key role and we have seen an increase in the use of
technology to assist people and promote their independence and help them to remain in their own homes.   
Technology Enabled Care (TEC) supports people to maintain essential links with the wider community and live safely and independently at home.  Key
services include the use of assistive technology and demand for this continues to increase.  The redesign of the community alarm service from analogue to
digital for 7,000 service users has been successful.  Training in TEC for Health and Social Care staff, third party organisations and service users is a key
area of focus. 
How are we doing?
There is a range of telehealth and telecare options which people can access, and the following case study provides an insight into the real benefits to
people who use them in terms of service and convenience while offering transformational and sustainable options in service delivery.  6,580 digital alert
alarms have been installed as of 31 March 2024.  The main reason telecare is requested is to improve a person’s safety and reduce risk of harm. 
There is a dedicated TEC team to support this work.  The team is situated in the award-winning Blantyre LIFE Care Campus, where visitors can try out
assistive technology such as kettles, virtual assistant technology, personal GPS tracking systems, etc. and speak to the team about how these solutions
can support them and their loved ones at home.  The TEC zone at Blantyre LIFE is a first of its kind health and social care collaboration with the Glasgow
Science Centre.  The innovative and interactive TEC zone plays an important role in supporting residents and service users to live independently and well.   
Near Me is a video consulting service that enables people to attend appointments from home or wherever is convenient.  The service is already widely
used across NHS Scotland for health and care appointments.  The service is now being rolled out across a wide range of public services.  All you need is a
device for making video calls like a smartphone and an internet connection.  Instead of travelling to their appointment, NHS Lanarkshire Near Me allows
patients or service users to enter an online waiting area from their computer, smartphone or tablet.  The service is notified when they arrive, and a health or
care provider joins the virtual consultation.  There are also Near Me, Near You community spaces in South Lanarkshire at Biggar Library, Blantyre LIFE,
Larkhall Lighthouse, The Old Schoolhouse, Abington, Whitlawburn Community Centre, Forth Valley Community Centre and Coalburn One-Stop Shop. 
Case study – Technology Enabled Care
Karen has progressive Multiple Sclerosis (MS) and lives with her husband Kevin who works full time.  Until recently Karen was managing well with support
from the Care at Home Service, however, Karen recently experienced several falls.  Kevin is very concerned about Karen’s safety and wellbeing when at
home on her own.  A community alert alarm was recommended following assessment and was installed in Karen and Kevin’s home.  The community
alarm alert responders respond to alert alarm activations when Kevin is at work.  The Care at Home Coordinator also showed Kevin how to use Amazon
Alexa Show’s video call “drop-in” function to keep in contact with Karen while he is at work.  Kevin purchased smart bulbs to allow Karen to control the
lighting in their home from voice commands to the Amazon Alexa device.  Karen advised the introduction of technology improved her health, wellbeing
and independence.  Kevin noted the drop-in feature is invaluable to him in his caring role and provides him with peace of mind when at work. 
121

Page 122

Priority Next Steps
Lanarkshire’s Technology Enabled Care (TEC) Team will continue to provide an integrated approach to sustaining people to live independently at home
and within their community.  The focus of the team is to promote early intervention, prevention and self-management empowering Lanarkshire citizens to
use technology to live their best lives, have choice, control and reduce the risk of harm.  The team are actively involved with colleagues to identify ways to
transform services and provide solutions to make services more sustainable for the future. 
Further information
• Assistive Technology
• Sensory Support
122

Page 123

Putting learning at the centre – Pathfinders Programme for Young People 
Why is this important?
Pathfinders is an alternative intervention initiative with an overarching aim of embedding a Community Learning and Development (CLD) approach within
the core of mainstream education to improve outcomes for young people identified as being ‘on the edge of care’.  The initiative was developed through
multi-agency planning to offer appropriate and meaningful support to identified young people and their families.  Pathfinders has adopted the attachment
theory principles to develop positive and consistent relationships. 
The aim of the programme is to deliver support in a non-statutory way, which is provided holistically across a range of settings, school, community and the
home.  Pathfinder support is bespoke, tailored to each young person and family, and takes the form of both individual and group support.  Home visits and
parental engagement are key elements of the work.  Pathfinder staff are well connected to key partners in the wider community to ensure appropriate
referrals into and out of the provision. 
How are we doing?
The Pathfinders Programme is currently embedded within seven schools in South Lanarkshire, with 14 Youth, Family and Community Learning Pathfinder
workers.  These are: Cathkin High School; Trinity High School; Stonelaw High School; Lanark Grammar School; Calderside Academy, Blantyre; St
Andrew’s and St Bride’s, East Kilbride, and Carluke High School.  This is funded through a mix of Whole Family Wellbeing Funding (WFWF) and Pupil
Equity Funding.  In 2023-24 the programme set a target to engage with 350 young people and families, providing support and sustained engagement that
meets identified needs.  At the end of March 2024, Pathfinders had worked with a total of 534 young people and families, exceeding our target by 52.5%. 
Impact and participation levels are recorded through agreed measures that are reported through the South Lanarkshire Community Learning and
Development Plan.  The following data demonstrates progress against targets set for the year 2023-24: 
• 5% increase in meaningful participation in school or learning in their social skills.  Actual increase 88%. 
• 5% increase in young people who recognise a positive adaptation in their behaviour.  Actual increase 18%. 
• 5% increase in young people who identify positive development in their Health and wellbeing.  Actual increase 24%.
• 5% increase in meaningful participation in school or learning. Actual Increase 12%. 
Priority Next Steps
The Pathfinders Team have successfully secured funding from the Scottish Government’s UNCRC Innovation fund to develop a youth led consultation
process that will allow young people to be the catalyst for change in relation to areas that affect their lives.  This funding will support the further
development of youth voice in relation to developing appropriate interventions and support and has enabled us to create rich opportunities for a committee
of 21 young people participating in the Pathfinders programme to directly influence the service that they receive and be involved and influence decisions
affecting them/the programme and other young people in South Lanarkshire. 
This element of the programme has three distinct phases:-
1. Skills development – to allow the participants the opportunity to develop the key skills and knowledge to actively influence the programme and services
they receive.
2. Consultation - the participants will develop and deliver a series of consultation events with their peer groups.
123

Page 124

3. Conference/Youth Summit – young people involved will host a conference for key partners, sharing life experiences, barriers to participation and
evidence of need to shape future policies. 
What people have said about the programme 
“Work placement has given me the opportunity to go do something I like and want to do as a job when I leave school”. 
“Football is a hobby and has given me something to do during the holidays. Pathfinders have included me in the Football events during summer. I have
met people and friends there”. 
“The different opportunities Pathfinders have given me I have been more open to go and trying new things than saying I don’t want to do the stuff.  I have
done that before”. 
“Pathfinders have helped me talk to people more about how you feel helping with my feelings.  I can go round there when I am having a bad day or need
someone to talk to”.  Young Person 
“Karis and Pathfinders have had an enormously positive impact on my daughter’s life.  To have someone who will always be there to support and
reinforce that she has talents has been very important to my daughter, to have someone who can provide opportunities which fit her needs, talents and
interests has been life affirming for her.  Karis has been pivotal in bringing my daughter back to a place of happiness after the struggles she has had, and
my husband and I are eternally grateful to Karis”. Parent of Young Person 
Further information
• Youth, Family and Community Learning - South Lanarkshire Council 
124

Page 125

Our children and young people thrive – Family Support Hubs 
Why is this important?
Central to South Lanarkshire’s vision for whole family support, is for families to flourish and get the right help at the right time, supporting a child's right to
be raised safely within their own families for as long as they need it.  Within South Lanarkshire, four Family Support Hubs are now open and provide 
easier access to help families.  The hubs provide an early social work response to pregnant women, babies, children and young people up to 18 years of
age to prevent an escalation to statutory teams by providing intensive whole family support.  In the first year of operation, the Family Support Hubs have
responded to 61% of the total referrals to Children and Family Social Work.  The hubs are community facing and offer better access to support for families
in Cambuslang, East Kilbride, Hamilton and Lanark.  The hubs have had such a positive impact on families, that families themselves are now the second
largest referrer to this support in the past year. 
How are we doing?
To reduce the number of babies, children and young people who have to live away from their families, we have been supporting all families identified by our
Early Years Multi Agency networks as needing extra help during pregnancy with Family Group Decision Making sessions.  This approach is expected to
empower families to make their own plan to safeguard their child. 
In an effort to reduce the use of child protection procedures, the Hamilton Family Support Hub have introduced a Parent Plan approach for vulnerable
pregnancies.  This approach still ensures there is early identification and response to risk and safeguarding concerns through a robust assessment and
review process using a Getting It Right For Every Child (GIRFEC) approach.  This has been successful, resulting in positive outcomes for families.  This
approach will be scaled up across all four of the Family Support Hubs in 2024. 
A Parenting Support Groupwork Pathway has been expanded to include support for parents with children aged 0-18 years.  This includes evidence based
and accredited programmes.  For those parents not requiring additional or intensive groupwork programmes, the pathway has been expanded to include
Family Support Hub specific groupwork programmes.  These provide general parenting and wellbeing support, a positive social experience and an
opportunity for parents to engage with their local Family Support Hubs. 
Priority Next Steps
A reflective Practice Coordinator is aligned to the hubs to support trauma informed practice amongst staff.  In year two, a Trauma Recovery Councillor will
support families.  The counsellor will work directly with families, as an early intervention approach before a situation has escalated and in line with local and
national priorities. 
During consultation, families said that staff with relevant lived experience should work in the Family Support Hubs.  In 2023, 3.5 individuals with lived
experience were recruited.  They work across all four Family Support Hubs.  Their remit within the team is to try to reduce the impact of parental substance
use by providing support to parents to address any barriers to their recovery.   Evaluating and building upon the initial successes of peer support remains a
priority. The support has been received positively by parents, Social Work colleagues and partners. 
Peer Support Worker Case study – Sharon’s Story (name has been changed) 
Sharon was referred to me following a period of emotional crisis.  She uses cannabis to deal with her mental health and is significantly affected by her
partner’s alcohol use.  Establishing the relationship from the start was slightly difficult as Sharon didn’t feel she could trust services due to being let
125

Page 126

down with her previous service from Social Work.  I had initially formed a relationship over the phone with Sharon for about two weeks, as her having
someone to speak to when she was feeling most on edge and anxious was reassuring for her to feel comfortable and understood before I managed to
visit her in her home. 
I had shared my lived experience with Sharon, we had so much in common with certain life events growing up which we could relate together, we could
then navigate the emotions and triggers to a point of acceptance to allow Sharon to move forward with life again, being able to relate to Sharon has
helped strengthen the working relationship between ourselves. 
I helped Sharon link in with the Clydesdale Resource Network – Mental Health Team in Lanark, also supporting Sharon to contact the doctor for
referrals to her Community Psychiatric Nurse (CPN) and councillor for ongoing support.  There was quite a lot of barriers at the start as Sharon has felt
misunderstood in the past from her CPN and counsellor, the experience had caused her to disengage from the services and her mental health had
spiralled into an emotional dark place.   
Working together to build up Sharon’s confidence and self-assurance has improved her mental health and day to day living.  Sharon is more driven and
motivated to embrace day to day tasks and follow through with her routines for the children and herself.  Her confidence has now increased, and she is
learning to play the ukulele and piano and going to join a local music group. 
Levels of stress within the family home have reduced significantly, Sharon is more confident in lifting the phone and seeking appropriate supports from
Mental Health Services, family and friends and social work.  Relationships with family members have also improved. 
I have learned in this experience that crisis can come at any time but so can solutions, and being able to problem solve with Sharon has been effective. 
I feel pointing out Sharons’ strengths and talents crossed out her negative self-concept and gave me great fulfilment knowing what work I was putting in
was being reciprocated as both Sharon and I were reaching goals together. 
Feedback from Sharon: 
“Carol has been amazing.  When we started, she said her goal was to help me get to a point where I don't feel like I need to move away to solve my
problems.  Didn't think that was likely but was wrong.  It's helped to have someone safe to talk to and to feel like I have someone on my side.  It’s been
easier to maintain the house and focus on moving forward again instead of feeling overwhelmed and frozen.  I'm almost grateful for what happened
before now because I doubt anyone else would have been able to help as much as she has”. 
What people have said about the Family Support Hubs 
“The support helped me to improve mine and my children’s situation, not only their environment but wellbeing too.  My perception of Social Work has
changed as a result”. 
The support from the hub has helped me overcome all obstacles in my way and helped get my confidence back as their kind words has reminded me of the
person who I truly am throughout my healing process”. 
126

Page 127

“I have found the approach to be more supportive than my previous experience of Social Work and I’m planning to also take up the option of attending the
parenting groups offered”. 
“My hub worker helped me and my daughter get through a traumatic experience of domestic abuse by spending time with us, being available when we
needed her and having a caring and supportive approach”. 
“I would not have managed over the past few months without having the emotional support. It has got me through a very difficult period, and even if I didn't
call one week, just knowing someone was there for me if I needed it was great”. 
Further information
• Family support hubs - South Lanarkshire Council 
127

Page 128

Good quality, sustainable housing for everyone – South Lanarkshire ECO4 Scheme 
Why is this important?
The South Lanarkshire Local Housing Strategy 2022-2027 aims to ensure everyone has access to a home that they can afford and meets their needs.  This
includes the ability to heat and maintain their home, with the higher cost of energy alongside other cost of living pressures having impacted on the
affordability of heating and maintenance, putting them in or at risk of fuel poverty.  Private home owners on lower incomes or with residents who are
vulnerable to the effects of a cold home may be particularly affected, including homes with very young children, older people, and people with health
problems. 
The Scheme also aligns with the Scottish Government’s Climate Change Plan that sets out a pathway for achieving Net Zero.  Also, with the Scottish
Government’s Heat in Buildings Strategy, that includes proposals to create a new Heat in Buildings Standard, requiring people who own their home to meet
a minimum energy efficiency standard by 2033 and private rented home owners, by 2028. 
How are we doing?
Recognising these challenges, in 2023 South Lanarkshire Council was amongst the first local authorities in Scotland to fully launch a new ‘Energy
Company Obligation Scheme’.  This allows national energy company funding to be used by locally based contractors to make energy efficiency
improvements to eligible private tenure homes at no cost to the homeowner or landlord.   
Administered through Ofgem, the current version of the Scheme is known as ECO4 and runs until March 2026.  Local authorities participate play a 
significant role working with contractors to ensure that the funding reaches households who will benefit the most.     
The South Lanarkshire ECO4 Scheme launched in July 2023 and so far, 128 private tenure households have benefited from the installation of retrofit
energy efficiency measures.  Within these, 326 measures have been installed over that period, surpassing the 300 annual target set out in the council’s
Local Housing Strategy and Community Plan.  A range of 18 different measures have been installed, with the most common installations being new Solar
Power systems (23% of installations) and boilers being upgraded to a renewable energy heating system (21% of installations).  Twenty properties have
benefited from first time central heating and 77 properties have benefited from a variety of home insulation measures (23%).  Each of these will contribute
to making homes being easier to heat and reduced bills for residents. 
Priority Next Steps
The scheme can be targeted to areas assessed as having poor property conditions, or where particular customer groups and household compositions
reside.  By working in partnership with the Fuel Poverty Group and contractors, we aim to ensure that the scheme reaches those most in need and at risk of
fuel poverty. 
Case study - ECO4 Scheme by South Lanarkshire Council
A resident who had issues with her boiler contacted Retrofit Group who are one of several approved ECO installers in South Lanarkshire.  After gathering
some more information, she was advised that the household could be eligible for ECO funding as the household income was less than the £31,000
threshold. 
The old heating system was temperamental, so the company prioritised a surveyor’s visit to carry out an assessment of the heating system.  From this,
the recommended energy efficiency measures were to replace the boiler with a new condensing boiler and to upgrade the heating controls. 
128

Page 129

Once the company submitted all the paperwork, an assessment of eligibility was completed by the council within one week, and the installation was
completed by the engineer within a single day, minimising the disruption to the resident. 
The resident told Retrofit, “I have just had the hottest shower since I moved into the property in August last year.  This has taken away a lot of anxiety for
me!  I now know that when I turn on the tap or shower that I have hot water and I don’t have to continually boil my kettle.  Thank you so much”. 
Through ECO4, this resident who lives on a low-income, now has an improved heating system providing better energy efficiency, a warm home and safe
access to warm water. 
Further information
More information on eligible households and approved contractors for South Lanarkshire ECO4 can be found in the links below:
• ECO Flex for suppliers - South Lanarkshire Council
• ECO Flex approved contractors - South Lanarkshire Council
• Contact: ECO4Flexscheme@southlanarkshire.gov.uk 
129

Page 130

Section 6 – Working with Communities: How you can get involved 
Community Participation and Engagement 
Why is this important?
Our work as a partnership is intended to improve outcomes for people who live, play and work in South Lanarkshire, particularly in those areas that
experience the poorest outcomes.  There is a lot of evidence that shows that when people are involved in decisions about services which affect them,
outcomes are improved.  As a partnership, we want to find ways to speak to communities and encourage them to act themselves and to have an influence
on how services are delivered where they live. 
The Community Empowerment Act 2015 (www.gov.scot/publications/community-empowerment-scotland-act-summary/) means that legally the partnership
has to place communities at the centre of its work, and work together with them to produce locality plans which we call Neighbourhood Plans, in areas
which have the poorest outcomes.  In South Lanarkshire we are ambitious and work to extend this beyond the legal requirements and listen to and involve
communities in a real and meaningful way.  The Act also sets out other requirements for public organisations, for example, in relation to Community Asset
Transfers and Participation Requests.   
During the year, many consultation and engagement activities were carried out by partners with communities in the South Lanarkshire area.  The following
sections in the report highlight some areas of this work. 
130

Page 131

Working with Communities: Neighbourhood Planning 
Why is this important?
Neighbourhood Planning is where both residents, local agencies and organisations are committed to working together to develop local plans for their
communities.  This work aims to reduce the inequalities that exist in our most deprived communities and improve outcomes for residents.  Key to this is
supporting communities to drive the process and work alongside partners and service providers.  Together they build a shared understanding of local
needs and priorities and respond to these making the most of our shared resources. 
Neighbourhood Planning involves communities in real and meaningful ways and has created positive change in these communities.  For more information
on the progress that has been made in these areas please see the communities’ Annual Reports:
www.southlanarkshire.gov.uk/cp/info/26/community_matters 
How are we doing?
We are working with nine communities to progress Neighbourhood Planning and a further one area is in progress.  The following is a snapshot of current
activity in some of the areas that are currently developing new plans. 
Hamilton South
The Hamilton South Plan includes the areas of Eddlewood, Fairhill, Low Waters and Laighstonehall.  Local people and the Stakeholder Group have created
a plan that can includes actions that recognise both the individual and collective communities of their area.  The Stakeholder Group meets every six weeks 
and is growing all the time, with both officers and community representatives attending regularly from across the whole area. 
East Kilbride South
In East Kilbride South, the first Stakeholder Group meeting was held in August 2023.  This was well attended by local groups and organisations.  At that
meeting, it was agreed to proceed with a whole ward plan and start the consultation to find out more about the hopes and aspirations of local people to
inform the plan.  An online consultation was held in October 2023 followed by door-to-door consultation within the priority area in November. The door-to-
door work and visits to five local schools were completed in March 2024.  The information will be analysed at the end of April 2024 with the plan on track to
be in draft in Summer 2024 and to be completed and ready to present to the CPP Board in September 2024.   
In East Kilbride South, the first Stakeholder Group meeting was held in August 2023.  This was well attended by local groups and organisations.  At that
meeting, it was agreed to proceed with a whole ward plan and start the consultation to find out more about the hopes and aspirations of local people to
inform the plan.  An online consultation was held in October 2023 followed by door-to-door consultation within the priority area thereafter. Engagement work
was also carried out at the 5 primary schools. The consultation closed on 2 May 2024 with 782 survey responses.  Next steps are to develop the
Stakeholder Group, to build its capacity and carry out further consultation to conclude the engagement activity and identify local priorities. 
Case study – Burnhill Neighbourhood Plan
A local group in Burnhill have developed a derelict piece of land they call the “High Backs” to use as a community space as there is a lack of facilities in the
area to host community activity.  This includes space for community growing in raised beds, a potting shed and a poly tunnel and three outhouses/sheds
within the garden to be used as a coffee hut, community pantry, a space for activities and a stage for the young people in the area. 
The main issues being addressed are the top 10 priorities highlighted by local people in the Neighbourhood Plan which are: more social and recreational
131

Page 132

opportunities, housing and environmental improvements, play park and sports park improvements, stronger and better communities, better education
training and employment opportunities, greater community safety, health improvements, better financial wellbeing, easier to get about and move around,
and more variety of shops and businesses. 
Some of the activities and projects designed to address these issues are Wellbeing Hubs, Family Hubs, Citizen’s Advice Drop in, Parent Café, Youth Action
Group, Cooking Courses, coffee mornings.  Throughout the year they also organise free themed community events such as summer fun days, Easter egg
hunts, Halloween events and a Christmas Elf Trail for the whole community.  The group are currently working on creating a community pantry to allow local
people access to free food and other household essentials, becoming a free sanitary product outlet and working to create a project plan with a developer to
explore the potential for further development of the community space. 
Some of the highlights from this year’s Neighbourhood Planning Progress Report are:
• 254 local people took part in the Participating Budgeting process, allocating funding to local projects.
• Over 50 people accessed free sanitary products.
• £50 vouchers for 100 residents to help with the rise in the cost of living.
• 8 adults took part in a healthy 'on a budget' cooking class.
• 15 cold weather packs given out to elderly residents.
• Coffee mornings with over 25 people present at each one.
• 950 residents attended the free big community events Easter, Summer, Halloween and Christmas.
• 1,000 people following the What's On in Burnhill social media page – the average post reach is 4.4k.
• 50 pumpkins, 100 advent calendars and 100 Easter eggs were given out for free to families.
• Burnhill Young Volunteers recognised with a volunteering award.
• 50 residents attended bingo in the High Backs.
• 100 residents were involved in outings/trips.
• 35 residents attending weekly Family and Wellbeing Hubs.
• 60 young people took part in the football summer club arranged by Glencairn Football Club 2006s. 
Link to High Backs Youtube video: https://www.youtube.com/watch?v=-eBGdIXgZwY 
How can you get involved?
If you have an interest in any of the communities that already have a Neighbourhood Plan, you can get involved by supporting delivery of the plan. If you
would like more information or would like to get involved in Neighbourhood Planning in your community, please contact the Community Engagement Team. 
You can call us on 0303 123 1017 or email us at communities@southlanarkshire.gov.uk 
Further information 
• South Lanarkshire Community Plan 2022-2032
• Neighbourhood Plans - Annual Progress Reports
• South Lanarkshire Community Planning Partnership
• Community Empowerment (Scotland) Act 2015
• National Standards for Community Engagement 
132

Page 133

Working with Communities: Community Partnerships 
Why is this important?
South Lanarkshire Community Planning Partnership is wholly committed to ensuring that communities are fully engaged in the process of Community
Planning. 
To achieve this, and to strengthen local democracy and community led decision making, locality-based Community Partnerships are being developed.  Two
have already been formed in the Cambuslang/Rutherglen and Clydesdale locality, and a further two are currently in development in the East Kilbride and
Hamilton localities.  The Community Partnership will act as an intermediary between the Neighbourhood Planning Stakeholder Groups, Community
Councils and the Community Planning Partnership (CPP) Board. 
There are 3 key commitments highlighted within South Lanarkshire’s Community Plan.  These are supported and delivered in the work of the Community
Engagement Team in partnership with Community Planning Partners, and other key stakeholders.  These include the following:- 
• We will continue to support and encourage every community to identify and act on their local priorities.
• We will bring communities together to share priorities and work jointly on them.
• We will involve local representatives in community planning at all levels, including on the Community Planning Partnership Board. 
How are we doing?
The Community Planning Partnership Community Development Officer supports the meetings of the established Partnership groups in the Cambuslang
and Rutherglen and Clydesdale localities.  Both groups identify priorities and needs from within the localities, work with partners and communities to deliver
on these and present updates on their progress to the strategic Community Planning Partnership Board.  Since June 2022, a representative from each
Partnership has attended the Board on behalf of their groups. 
Both established Community Partnerships are currently focussing on how they will share information about their work within their local communities.  One
way to do this is using the Community Planning website to highlight action points from meetings, as well as future planning and priorities.  This will further
emphasise their essential roles in the Community Planning process and will publicise them more within the local areas.  They are also focusing on the
allocation of Lived Experience Funding, which will assist in their aim to reduce deprivation and tackle poverty. 
Partnerships in the East Kilbride and Strathaven and Hamilton localities (Hamilton includes Blantyre, Bothwell, Hamilton, Larkhall, Stonehouse, Uddingston)
are currently being developed.  Work will continue to strengthen the new Community Partnerships in theses areas and there will be further meetings with
Community Councils and Stakeholder Groups. 
How can you get involved?
Community Partnerships maximise opportunities for local people to be more involved, and influential in decision making that affects them in line with the
South Lanarkshire Community Planning Partnership strategic priorities.  Community Councils, Neighbourhood Planning, and other area stakeholders such
as Community Led Planning Groups are currently involved in Community Partnerships.  If you or your group would like to get involved, or require further
information, please contact communities@southlanarkshire.gov.uk or 0303 123 1017.   
133

Page 134

You can also visit the following website for more details and information regarding community planning, and Community Partnerships in South
Lanarkshire:- https://www.southlanarkshirecommunityplanning.org/info/1/what_is_community_planning/136/community_partnerships. 
Further information
What is Community Planning?: The Community Planning Partnership in South Lanarkshire and what it could mean to you (youtube.com) 
“I am really enjoying working alongside representatives from the four Community councils across Cambuslang and Rutherglen and the four Our Place
Our Plan Stakeholder Groups.  Although we are still relatively new, our role is to act as an intermediary to ensure that communities are properly and
meaningfully engaged, involved and influential in Community Planning and the work of the South Lanarkshire Community Planning Partnership Board”. 
Cheryl Burnett, Springhall and Whitlawburn OPOP Stakeholder and Chair of the Cambuslang and Rutherglen Community Partnership.
134

Page 135

Working with Communities: Sustainable Development and Climate Change 
Why is this important?
Climate change and sustainable development are important considerations for community planning because they have significant implications for the well-
being of communities, the environment, and future generations.  This has been identified as a priority in the new Community Plan and can only be delivered
through working together, with our communities.  Community Planning Partners can help to ensure that development is resilient, sustainable, fair, and that
legal requirements are met. 
Empowering communities to take climate action and be more environmentally sustainable is one of the council’s priority actions and work in this area
reflects wider understanding of community participation in tackling climate change.  Recognising that public engagement is central to tackling the impacts of
climate change, the Scottish Government set out a framework for engaging the people of Scotland in a transition to a net zero nation by 2045. The three
objectives underpinning the framework which set out the importance of community planning are noted below: 
• Understand – Communicating climate change and how it relates to people’s lives;
• Participate – Enabling participation in shaping just, fair, and inclusive policies that promote mitigation and promotion of climate change; and
• Act – Encourage taking climate action in households, communities and places. 
How are we doing?
As communities are central to creating a just and fair transition to net zero, over the past year we have undertaken community place-based climate action
across South Lanarkshire to support and empower communities to become sustainable, inclusive and thriving places.  Led by the council’s Sustainable
Communities Engagement Officer (SCEO), work has focused on building relationships between communities, council services and external partners to help
support and encourage climate action at a community level.  The officer has been involved in several community-based initiatives during 2023/24 aimed at
supporting engagement on climate and sustainability focused issues across South Lanarkshire.  Direct engagement with community groups has helped
them to achieve their aspirations with regards the sustainable development and climate change agenda.  Examples include: 
• Supporting delivery of the ONECAN Carluke Community Climate Conference;
• Supporting community networking and learning exchanges directly within communities; and
• Supporting grant applications to help realise community aspirations. 
How can you get involved?
South Lanarkshire Council will continue to administer the Climate Emergency Fund over the coming year which will be made available to community groups
who are looking to pursue environmental, sustainability, or climate change projects.  These grants will allow communities to implement activity that is
important to them and will better enable them to respond to the unique challenges areas face in tackling climate change and its local impacts.  You can get
involved by applying for a grant to help deliver activities in your communities.  Grants of up to £2,500 are available to community groups and partner
organisations and information on how to apply can be found by following the link below. 
135

Page 136

Further Information
• Sustainable development and climate change strategy:
www.southlanarkshire.gov.uk/info/200303/climate_change_and_sustainability/2100/sustainable_development_and_climate_change_strategy
• Climate Emergency Grants:
www.southlanarkshire.gov.uk/info/200168/getting_involved_in_your_community/2023/climate_emergency_and_social_enterprise_grants
136

Page 137

Working with Communities: Community Led Planning 
Why is this important?
The Community Led Planning process enables communities to identify local priorities and produce an action plan that helps people to take realistic steps
towards the change they want to see.  By bringing everyone together to think about what is needed, this process highlights the skills and resources already
available in the community, as well as identifying the gaps and the support required from others to make it happen. 
How are we doing?
Communities across South Lanarkshire in the Clydesdale, East Kilbride and Larkhall areas have created their own Community Action Plans.  These plans
have been developed through extensive community engagement activity delivered by local people, for the benefit of the whole community to take
ownership of and work together to achieve the priorities set out in the plan.  You can find more information about the communities that have their own plans
and view their latest plans on the Community Planning website: - https://www.southlanarkshire.gov.uk/cp/downloads/file/458/local_community_plans. 
Case Study – Crawford Community Led Plan Engagement Work 
In 2023, community representatives in the village of Crawford came together to consider how they understand their community and collectively decided
to undertake a community led planning exercise to get to know their community better, enhancing their understanding of the priorities of the people
within the village and moving forward towards having stronger collective action for the future. 
A Steering Group of 10 local members was created, with representation from six local community groups and some local residents who were not part of a
community group.  To truly get the value out of this experience, the group decided to lead every element of the community planning exercise themselves
instead of appointing any contractors to ensure full attention to detail from the onset.  They designed a survey to find out the views of the community. 
This was delivered to every property in the area (including 51 rural remote properties).  The response rate from this survey exceeded the 40% target the
group had set.   
The Steering Group hosted a community event to share the survey feedback and identify key projects for action, using this engagement session to fully
understand how these priorities would be achieved.  They used interactive stalls, for example in the village shop, community café, village hall to show
physical examples of how to achieve the priorities in the community’s plan.  This is a unique engagement method, created to encourage active
participation from community members in supporting the next stages of the Community Plan once launched. 
Whilst this process has been ongoing, the Village Hall was listed for closure.  As a result of their engagement work, the Steering Group were able to
identify that the village hall is an important asset within the community and is valued by local residents.  The Steering Group has taken steps to become
a registered charity Crawford, Elvanfoot, Dar Action Resource (CEDAR) so that they can apply for a Community Asset Transfer to retain the village hall
as a community asset.   
How can you get involved?
If you have an interest in any of the communities that already have a local action plan, you can get involved by supporting delivery of the plan.  If you live or
work in a community that would like to create their own action plan, please see our local Community Planning Toolkit for further information.  If you would
like more information, please contact the Community Engagement Team. You can call 0303 123 1017 or email us at
communities@southlanarkshire.gov.uk. 
137

Page 138

Further information
Community Planning Toolkit: www.southlanarkshire.gov.uk/cp/downloads/file/365/community_led_planning_toolkit
If you would like a copy of the toolkit, including template documents, please email: contact@southlanarkshirecommunityplanning.org 
138

Page 139

Working with Communities: Participatory Budgeting 
Why is this important?
Participatory Budgeting (PB) actively engages residents in local priority setting, decision making and the allocation of elements of public funds. 
How are we doing?
The PB process has been adopted across nine Neighbourhood Planning areas who are sharing a bigger budget than usual thanks to match funding from
the national lottery.  £286,000 (allocation based on population size) was shared between these neighbourhoods and a variety of approaches are being
used to allocate this funding, based on local circumstances.  Three neighbourhoods had undertaken their PB processes in 2022/23 while our other
communities have completed their own this year.   
2,996 local people have had their say on how money should be spent within their community.  Example of projects funded across all areas include: youth
activities including, youth clubs, football, skateboarding, and a playscheme; family activities and community events; mental wellbeing support; food growing;
emergency food aid; keep fit classes; and a child and family programme.  The Hamilton South area participated in its first Participatory Budgeting (PB)
exercise, and after doorstep, online and community voting, £21,000 was allocated to groups and organisations who operate locally and benefit local
residents.  The beneficiaries of the funding have participated in training, promoted sustainability through environmental based projects and contributed to
supporting local groups to assist with the current economic challenges being faced in communities. 
“Hamilton South Church would just like to say a huge thank you for the recent grant award of £2,000 which will allow us to purchase new integrated
ovens and hobs for our kitchen.  This new kitchen equipment will help us extend our work and widen our partnerships across Hamilton South.  We
intend to link with local community groups and organisations in terms of offering our facilities for cookery classes, improving skills, and promoting
healthier eating.  Our weekly lunch club will also benefit as we can now offer a wider variety of hot food”.  Hamilton South Church Volunteer 
How can you get involved?
If you would like more information or would like to get involved in Neighbourhood Planning in your community, please get in touch with the Community
Engagement Team.  You can call us on 0303 123 1017 or email us at communities@southlanarkshire.gov.uk. 
Further information
• PB Scotland - Participatory Budgeting in Scotland
• The PB Charter for Scotland - PB Scotland
• South Lanarkshire Community Planning Partnership - Community Matters 
139

Page 140

Working with Communities: Volunteering 
Why is this important?
During the economic crisis, volunteers within South Lanarkshire continue to give their time, energy, and commitment every day to support their
communities.  Relieving pressure on statutory services, volunteering is an essential for the delivery of life saving interventions the Third Sector offer.  The
benefits of volunteering are evident, volunteers have a direct impact on improving mental health, reducing social isolation and an increase in wellbeing for
themselves and those they support. 
How are we doing?
The benefits of a collaborative approach to volunteering are as apparent now as they were when the “post COVID learning and evaluation exercise” was
carried out.  To build on the positive effect partnership working has on communities, Voluntary Action South Lanarkshire (VASLan) and South Lanarkshire
Council’s Employability Services have been working together to create a smoother journey into volunteering.  The new employability pathway is a
streamlined referral path, working closely with key workers across four employability programmes.  Key workers aim to remove barriers to volunteering by
offering support in areas such as confidence building, life, and social skills.  At the point where these barriers are reduced, a VASLan Volunteer Support
Officer offers a tailored approach to volunteering placement, working with the key worker and volunteer.  The Development Officer will link potential
volunteers with opportunities throughout South Lanarkshire ensuring a stable, secure, and successful placement. 
2022 saw the creation of the South Lanarkshire Volunteering Strategy, endorsed by all partners through signing a Volunteering Pledge.  VASLan took the
lead on the creation of the strategy and the partnership continues to utilise the strategy to promote good practice and strengthen the volunteering offer to
South Lanarkshire.  Continuing to support and guide partners and voluntary organisations in good volunteering practice remains one of VASLan’s main
priorities.  Working in partnership with Volunteer Scotland they will continue to promote the Quality Standards Pipeline and to support organisations to sign
the Volunteer Charter, achieve Volunteer Friendly or Investing in Volunteers accreditation.  VASLan are proactive in promoting good volunteer
management, supporting organisations to apply and gain the quality standard their organisation is eligible for. 
Coming out of the COVID pandemic, and facing daily cost of living challenges, it is vital that VASLan work with partners and the Third Sector to support the
delivery of services by creating a strong volunteer network.  Supporting the creation of flexible, inclusive, and diverse volunteering opportunities will remain
to be an essential part of their work, by doing so VASLan will support volunteers into meaningful opportunities while supporting the Third Sector to thrive. 
The following are some of the highlights of 2023/24: 
• 728 new volunteers registered;
• 80 volunteers given tailored pre-volunteering support;
• 1,591 volunteering placements facilitated; 
• 82 new volunteering opportunities created;  
• 11 organisations have achieved a quality standard.  21 are currently working towards a Quality Standard and an additional 14 have indicated an interest;
• 377 new Saltire volunteer registrations;
• 20,088 Saltire hours logged;
• 5 Saltire Group Administrators approved; and
• 274 Saltire Certificates issued. 
140

Page 141

Further Information:
• Voluntary Action South Lanarkshire (VASLan)
141

Page 142

Working with Communities: Community Asset Transfer 
Why is this important?
Local councils, the Scottish Government and other public authorities, own or rent lots of land and buildings, like schools, hospitals, parks and forests.  The
Community Empowerment (Scotland) Act 2015 gives community organisations a right to ask to take over control of land or a building.  If the community
organisation’s plan is better for people, they will be allowed to buy, rent or have the use of it.  This is called Community Asset Transfer (CAT).  The Act sets
out specific criteria that needs to be met by community organisations.  The ownership or control of community assets is a powerful tool for communities to
drive change and achieve their goals. 
The CAT process allows statutory partners including the council to work closely with their communities to develop local services and provision that are
responsive to the needs of residents.  By capitalising on the local knowledge and expertise of those who live in these communities we can assist in the
flexible usage of public sector assets and work together to make the greatest impact possible in the communities in which we serve. 
How are we doing?
In 2023-24, South Lanarkshire Council was the only Community Planning Partner that dealt with Community Asset Transfer requests.  South Lanarkshire
Council’s CAT Officer continues to work with a high degree of interest from local residents and community groups to take advantage of the legislation by
using land and property owned by the council.  During 2023/24, SLC received and validated seven CAT requests.  Three of these were for the purchase of
land, the remaining four for lease.  Four were approved, one declined, one temporarily withdrawn, and one continues to be negotiated.  The number of
ongoing enquiries, which have been supported, has also grown, with over 50 organisations working on proposals from community growing spaces to
community football pitches.  In addition, due to potential closures of buildings because of funding pressures in South Lanarkshire Leisure and Culture, the
CAT Officer has been supporting 27 potential transfers to interested parties. 
How can you get involved?
CAT is open to any community-controlled body which has the relevant constitution or governance documentation and is open to all members of the
community they serve.  Any group applying for a CAT must show they have organisational strength to take on and manage an asset, and that they are
supported by the community which they serve.  The CAT process is an exciting opportunity which can benefit any community but involves a lot of time and
effort.  In recognition of this, the CAT Officer can provide tailored support to each organisation.  This support can be augmented by assistance from other
organisations, such as Voluntary Action South Lanarkshire (VASLan), Community Enterprise, Just Enterprise, Community Ownership Support Services and
the Scottish Council for Voluntary Organisations (SCVO). 
Blantyre Soccer Academy – Larkfield Hall and Stonefield Pitches
“The CAT Officer supported Blantyre Soccer Academy with their approach to purchase both land and a former community centre from the council to
develop these into an asset worthy of the Blantyre community which they serve. 
The group developed and submitted a comprehensive business plan and have already worked with the Scottish Football Association to receive funding
which will support the pitch development aspect of this property. 
Everybody involved is excited about the potential of this project”.  Jimmy Whelan, Chairperson Blantyre Soccer Academy 
142

Page 143

Further information
• Community Asset Transfer
143

Page 144

Working with Communities: Participation Requests 
How are we doing?
Participation requests are a formal way for community bodies to request to be involved in decisions and put forward their ideas on how services could be
changed to improve outcomes for the community.  Requests can be made to a range of public bodies including South Lanarkshire Council, NHS
Lanarkshire, Police Scotland, Scottish Fire and Rescue, etc. 
In 2023-24, no participation requests were received by Community Planning Partners.   
To make a participation request, your group must meet some requirements including having a membership open to your community and working for
community benefit.  Your first step should be getting in touch with the public body you would like to work with for assistance in getting started. 
This can identify if they are the right public body to contact and they can also help you to get advice and information about any existing consultations or
decision-making processes that you could be involved in without needing to make a formal participation request. 
Further information
• Participation Requests
• Annual report 2023-2024 - South Lanarkshire Council 
144

Page 145

Appendix 1 
145

Page 146

Appendix 2 
CPP Structure Diagram 
146

Page 147

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: 2025/2026 Revenue Budget Gap and Savings 
1. Purpose of Report  
1.1. The purpose of the report is to:- 
 provide an update on the budget gap and savings proposals for 2025/2026, and
provide the outcome of the Cross-Cutting Review of the Loans Fund and Service
Concessions (IFRS 16). 
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):- 
(1) that the update on Key Budget Areas (section 4), be noted;
(2) that the £3.600 million Conseqentials will be set aside to contribute to the
2025/2026 Pay Award (section 4.2), be approved;
(3) that the 2025/2026 budget reductions in Utilities and Council Tax (section 4.8,
Table 1) be used to reduce the Budget Gap, be approved;
(4) that the proposed savings included in Appendix 1, be considered; 
(5) that the position re Additional Teachers, (section 5.4), be noted;
(6) that the Loans Fund Review proposal to remove voluntary repayments
(summarised in sections 6.3 - 6.8 / detailed in Appendix 4), be considered;
(7) that the resultant savings from the Loans Fund Review summarised in Table 4
(section 6.7) be agreed to reduce the Budget Gap, be considered;
(8) that the Service Concessions (IFRS 16) review savings detailed in Table 5
(section 6.11), be noted; 
(9) that the use of Loans Fund Review Underspends to support the Budget Strategy
from 2027/2028 to 2029/2030, as proposed in section 6.16 (Table 8), be
considered; 
(10) that the revised 3-year Budget Gap across the period 2025/2026 to 2027/2028,
as detailed in section 7 (Table 9), be noted; and  
(11) that the risks detailed in the Other Implications Section (section 13), be noted.  
3. Background
3.1. A report titled 2025/2026 to 2027/2028 Revenue Budget Strategy was presented to
the Executive Committee in June 2024.  This paper focussed on the financial outlook
for the next 3 years, highlighting a Budget Gap of £77.275 million.  The Budget Gap
relating to financial year 2025/2026 is £22.355 million.  
8
147

Page 148

1 
3.2. This paper will provide an update on a number of budget areas including the impact
of Pay Awards, the price of utilities and an early outturn on Council Tax collected in
2024/2025.  It will also discuss options to balance the Budget and will include reference
to Council Tax as well as savings proposals resulting from the Council’s
Transformational Change Programme. Part of the Transformational Change
programme includes the Cross-Cutting Review of the Loans Fund / Service
Concessions.  The outcome of that review will also be covered in this report.   
3.3. This report will cover the following: 
• An update on key budget areas (section 4), 
• Savings and the Transformational Change Programme (section 5), and
• Review of Loans Fund and Service Concessions (section 6). 
3.4. Taking account of the update in section 4, section 7 considers the Budget Gap across
the 3-year period, 2025/2026 to 2027/2028.  A Summary, options, Next Steps and a
Timeline for consideration is provided in section 8.   
3.5. Section 9 provides details of the Reinstatement requirements following previous year
budget decisions, and section 10 details employee implications resulting from the
proposals in this report.  Other implications are detailed in section 13 and section 14
provides an update on the Integrated Impact Assessments carried out on the savings
and Budget proposals. 
4. Update on Key Budget Areas 
4.1. Since the last Budget Strategy report in June 2024, the 2024/2025 Pay Award has
been implemented and further information has been received on utility projections.  In
addition, an early outturn position for Council Tax properties has been completed for
2024/2025.  Each is taken in turn. 
4.2. 2024/2025 Pay Award:  The Council’s Budget for 2024/2025 included an initial pay
award assumption for non-teachers from 1 April 2024 and for teachers from mid-
August 2024.  This was augmented by the UK Government Consequentials monies
(£3.600 million) which were set aside for pay awards.  The pay award for 2024/2025
has now been implemented and the cost of the award can be managed within the
pay assumptions for 2024/2025.  As we prepare for the 2025/2026 Budget and Pay
Award, the in-year (2024/2025) Consequentials funding of £3.600 million will be set
aside to contribute to the 2025/2026 Pay Award costs.     
4.3. Utilities: As noted in June 2024, recent information has suggested a downward trend
in the anticipated price of utilities into 2024/2025 and this allowed a benefit to the
Strategy of an estimated £2.000 million.  This will result in an in-year underspend of
£2.000 million in 2024/2025.  The Council is a member of the buying consortium who
purchase wholesale energy in advance, on behalf of ourselves and other public sector
bodies.  The price indications specifically for electricity purchased for the next couple
of years indicates further price reductions beyond that assumed for 2024/2025.    
148

Page 149

2 
4.4. Since June 2024, further information has been received and while still only a
proportion of the required units are purchased for the year 2025/2026 and 2026/2027,
based on what has been purchased so far, the financial benefit into 2025/2026 is
higher than has been assumed in the Budget Strategy.  As more wholesale units are
purchased during the year, further certainty can be reached on the projected costs
and this will continue to be monitored as the year progresses, however, based on
current information, the Budget Gap for 2025/2026 could be reduced by £3 million.         
4.5. Council Tax:  The Council Tax Budget for 2024/2025 assumed the impact of new
build properties during 2023/2024 and an estimate into 2024/2025.  Given the
current economic climate, and the risk that development would not progress as
originally anticipated, the budget estimates included a prudent assumption regarding
development numbers, and also that the arrears collection would not continue at the
current levels.   
4.6. An early outturn has been completed on the 2024/2025 Council Tax budget.  This is
showing an estimated over-recovery of Council Tax income of £3.3 million for
2024/2025.  This reflects a better level of arrears collection than previously
experienced, and also shows an increase in property numbers over and above the
budgeted level. 
4.7. Moving into 2025/2026, the Budget Strategy included a prudent assumption of £1.4
million for new properties based on a slowing of the market, and also a lower
assumption of arrears collection aligned to the ongoing cost of living crisis.  However,
based on the 2024/2025 early outturn, it is proposed that the 2025/2026 Budget
could benefit from the full year impact of additional new properties between
September 2024 and March 2025, as well as any further new properties in
2025/2026.  An estimate of £1.000 million has been made to reflect this.  Overall, this
would reduce the 2025/2026 Budget Gap by £2.9 million. 
4.8. Table 1 shows the impact of the further information on these key budget areas.   
Table 1:  Update on Key Budget Areas 
2024/2025
In-Year
Underspend
(One-Off
Benefit)
£m
2025/2026
Reduction
in Budget
Gap 
£m
Utilities (sections 4.3 – 4.4) 2.000 3.000
Council Tax (sections 4.5 – 4.7) 3.300 2.900   
Total 5.300 5.900 
4.9. Table 1 shows that the key budget areas have resulted in a total underspend of
£5.300 million anticipated in 2024/2025 and a reduction to the 2025/2026 Budget
Gap of £5.900 million.  This would take the original Budget Gap from £22.355
million to £16.455 million.  
149

Page 150

3 
4.10. While these figures are significant, it is acknowledged that at the time of writing,
neither the UK Government nor the Scottish Government Budgets have been
released for 2025/2026.  As a consequence, the Council has no certainty on its
financial settlement for 2025/2026.  The Council will not know its financial Settlement
for 2025/2026 until after the UK Government and then the Scottish Government
budget is set with the Settlement itself due to be received by the Council on 12
December 2024.  This is a significant risk area in terms of the Budget Strategy and
as a result, it is proposed that no action is taken regarding the 2024/2025 one-off
underspends noted in Table 1, and that instead, these are considered alongside the
Settlement when it is received in mid-December 2024.  Members will be updated on
the impact of the Settlement in January 2025.   
5. Savings and the Transformational Change Programme
5.1. As presented to Members as part of the June Budget Strategy paper, in order to
bridge the Budget Gap, a Transformational Change programme is underway.  This
includes a series of cross-cutting reviews across the Council, as well as specific
reviews across the individual Resources.  These Transformational Cross-Cutting
Reviews have been reported to the Performance and Review Scrutiny Forum in
August and an update will be provided in November 2024, with the outcomes
achieved to date informing a package of savings.  These proposed savings resulting
from all the Transformational Change Programme (Cross-Cutting and Resource
Reviews) are provided in Appendix 1 for Members’ consideration. 
5.2. The full savings pack as it stands totals £10.663 million. This can be compared to the
Revised Budget Gap of £16.455 million (section 4.9).  This is shown in Table 2.   
Table 2 – Summary of 2025/2026 Savings Proposals 
2025/2026
Savings
FTE
2025/2026
Savings
£m
Previously Approved - 0.500
Management and Operational 16.85 3.769
Cross Council - 0.375
Community & Enterprise 92.50 4.011
Education 6.00 1.510
Finance & Corporate - 0.180
Housing & Technical - 0.318
Social Work - -
Total Savings (Appendix 1) 115.35  10.663   
Revised Budget Gap (Section 4.9)  16.455 
5.3. The savings of £10.663 million includes Previously Approved Savings of £0.500
million, Management and Operational Savings of £3.769 million along with Resource
savings proposals of £6.394 million for consideration. 
5.4. Teachers:  Education Resources have been reviewing their service with a view to
identifying savings.  A funding allocation was made to the Council from the Scottish
Government for additional teachers.  Currently, Education Resources has funding
equivalent to an additional 115 FTE teachers beyond core teacher allocations
within our school establishments.  This additionality was provided to support pupils
150

Page 151

4 
who experienced significant learning loss as a result of school closures during the
COVID period. Schools deployed this additional teacher staffing flexibly in response
to local need within their own school communities for example supporting catch up
programmes in literacy and numeracy in primary schools and bespoke supports to
improve attendance for those struggling to return to the secondary school
environment. It also provided for teacher cover, if required.  The funding has
provided a level of teachers beyond our core staffing model and beyond our statutory
obligations. It would still be possible to operate without these staff by returning to
core staffing levels in schools. 
5.5. Table 3 shows the impact in FTE and in monetary value if the additionality was
removed from 2025/2026. 
Table 3:  Teachers’ Additionality 
FTE Value
£m
2025/2026 57.5 2.300
2026/2027 57.5 3.700
2027/2028 - 1.400
Total 115.0 7.400 
5.6. The reduction could be implemented from August 2025.  £2.300 million could be
realised in 2025/2026, further savings of £3.700 million achievable in 2026/2027 and
£1.400 million in 2027/2028 meaning the complete annual saving from 2027/2028
equates to £7.400 million.   
5.7. No proposal has been included in the savings pack in Appendix 1, on the basis that it
affects teacher numbers and there remains uncertainty regarding the potential
impact on the Government Grant if teacher numbers were to be reduced. In
2024/2025, the Scottish Government has advised that the grant relating to teacher
numbers will be conditional on the Council agreeing at the outset to maintain teacher
numbers.  At the time of writing this report, there is no guidance in relation to any
penalty for reducing teacher numbers in 2025/2026, nor whether any penalties will
be applied in 2024/2025. 
5.8. If the position nationally changed such that it became appropriate to consider
savings against teacher numbers, this could help address the 2025/2026 Budget
Gap by £2.300 million.  By not cutting teacher numbers, higher levels of cuts will be
required to be agreed through the savings pack. 
6. Transformational Review – Cross-Cutting Review of Loans Fund and Service
Concessions (IFRS16)
6.1. As reported to the Executive Committee in June 2024, one of the Transformational
Programme’s cross-cutting reviews was to look at the Council’s Loan Charges budget,
and the repayment of debt through Service Concessions.  How these charges, in
particular the repayment of debt, are calculated and accounted for can have a material
impact on the amounts charged to the Council’s Revenue Budget. 
6.2. Appendix 4 of this report provides a detailed report on the Loans Fund Review and the
options available in relation to Additional Voluntary Repayments.  In addition, it also
looks at the options available in relation to Service Concessions payments as a
consequence of implementing IFRS16.  A summary of the output of the review is
detailed below. 
151

Page 152

5 
6.3. Loans Fund Review / Additional Voluntary Repayments:  The previous review of
the loans fund in 2019 looked at the repayment profile of the borrowing from the Loans
Fund to fund the capital programme.  By extending the period over which the borrowing
was repaid, it was identified that £68 million of loans fund advances had been repaid
earlier than it would have been under the revised approach.  These one-off monies
were approved for use in supporting the Council’s Budget Strategy. 
6.4. In addition to the benefits from the historic overpayment, the Council could also repay
future advances over an extended period.  By doing this, while it released further
savings in repayments, the downside was additional interest costs as a result of the
debt outstanding remaining higher for longer.  To mitigate the additional interest costs,
an alternative approach was identified that involved making additional voluntary
repayments of debt. This was the approved position in June 2020 (Executive
Committee). 
6.5. However, given the further budget pressures being faced by the Council in the coming
years, the additional voluntary repayments have been reconsidered with a view to
lowering the loan charges spend across the medium term.  The impact on interest
payments has also been considered as part of this Review.  The option to remove
voluntary repayments is only available from 2025/2026 onwards due to the fact that
they were originally programmed to start in that year.   
6.6. By no longer making these voluntary repayments, then the loan charges incurred by
the Council will be lower in the 3 years of this Budget Strategy (2025/2026 to
2027/2028 – as shown in Annex A to Appendix 4).  The result of this is that we will
underspend in our Loan Charges budget. The recalculations present an underspend
of £18.849 million in 2025/2026 but this underspend decreases into future years to
accommodate the profile of debt repayments and consequent interest charges.  This
is shown in Appendix 4, Annex A.   
6.7.  While the savings / underspend starts at £18.849 million in 2025/2026, the level of
savings each year thereafter reduces over time so we cannot take this higher level of
savings on a permanent basis.  Instead, it is proposed that we take a 3-year view of
the savings achievable from the review and that a total saving of £14.600 million be
taken and spread this across the 3 years from 2025/2026 to 2027/2028.  This is shown
in the first 3 columns of Table 4.  These figures include the additional interest costs
incurred from not repaying the voluntary repayments (as referred to in Section 6.5). 
For information, the interest costs total £185.637 million across the years 2025/2026
to 2061/2062 (ie across 36 years), and these are included in the Strategy proposed. 
At today’s prices, this equates to £97 million. 
Table 4:  Loans Fund Review – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Cumulative Savings 5.500 11.000 14.600  13.600 13.100 
152

Page 153

6 
6.8. Table 4 shows that the Loans Fund Review could help address the Budget Gap by
£14.6 million over the 3 years of the current Revenue Budget Strategy (from
2025/2026 to 2027/2028).  Table 4 also shows that after 2027/2028, there will be a
requirement to increase loan charge budgets:  reinstatement of the budget is required
in 2028/2029 (£1.0m) and 2029/2030 (£0.5m) as shown in Table 4.  The cumulative
£13.100 million shown in Table 4 reflects savings of £14.600 million for the first 3 years,
and then a cost of £1.5 million thereafter.  
6.9. Service Concessions / IFRS16 (Statutory Charge for Repayment of Debt): In
2022/2023, the Council applied flexibilities regarding how the debt element of Service
Concessions (PPP scheme) payments are charged to revenue. These flexibilities
arose from accounting regulations which removed the restriction that we have to
account for these costs over the life of the contract rather than the life of the asset.  By
charging debt to the Revenue Budget over the life of the asset, rather than the contract
period, significant one-off retrospective savings were realised, as well as permanent
budget savings.   
6.10. IFRS16 is an accounting standard that councils have to implement in 2024/2025.  The
consequence is that there are changes in how the Council accounts for leases in its
Annual Accounts.  This standard also applies to how we account for the Council’s
Service Concessions (PPP scheme).  By applying this standard, there is a reduction
in what is charged to the Revenue Budget over the medium term, allowing further
savings to be made. 
6.11. The impact of this change in accounting treatment releases savings of £1.600 million
across the 3 years of the Budget Strategy from 2025/2026 to 2027/2028.  It is proposed
that these budget reductions of £1.600 million are used to help address the Council’s
Budget Gap across the years 2025/2026 to 2027/2028.   The profile of the savings
across the coming years is shown in Table 5. 
Table 5:  Service Concessions – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Service Concessions 1.100 0.500 -  1.300 1.700
Cumulative Savings 1.100 1.600 1.600  2.900 4.600 
6.12. Table 6 summarises the total benefit of the Loans Fund Review to the Budget Gap for
2025/2026 to 2027/2028.  The 2025/2026 saving has not yet been included in the
savings package in Appendix 1. 
Table 6 – Total Savings from Review (Loans Fund & Service Concessions) 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Service Concessions 1.100 0.500 -  1.300 1.700
Total Savings 6.600 6.000 3.600  0.300 1.200
Cumulative 6.600 12.600 16.200  16.500 17.700 
153

Page 154

7 
6.13. The savings from this Review are substantial.  While there is a downside in terms of
the additional interest costs, a recurring saving can still be delivered for the Council
without the need to cut other Council services. If this is accepted, then this could help
address the Budget Gap by £6.6 million in 2025/26, and by £16.2 million by 2027/28. 
If it is not accepted, higher levels of cuts will be required to be agreed through the
savings pack.  In terms of the Service Concessions savings, these will happen as a
result of the required change in accounting practice.   
6.14. Table 7 below shows the potential savings from the Loans Fund Review / Service
Concessions alongside the Budget Gap for the years 2025/2026 to 2027/2028 for
reference. 
Table 7 – Potential Savings from the Loans Fund Review 
6.15. Loans Fund Review In-Year Underspends: As the proposal is to take the Loans
Fund Review savings across the 3 years of the Medium-Term Budget Strategy
(2025/2026 to 2027/2028), there will also be in-year underspends that could be used
to further support the Budget Strategy in future years.  These are shown in Table 5 in
Appendix 4 (Annex B).  This table also shows an in-year underspend of £7.246 million
in 2024/2025 which is the result of a reduction in repayments of external debt due to
the timing of the original Loans Fund Review being implemented, and also reflects
reduced costs as a result of the timing of borrowing required for various projects within
the Capital Programme. The total underspend available across the 4 years (2024/2025
to 2027/2028) is £26.495 million. 
6.16. There is the option to use these underspends to help address the Budget Gap in future
years, being mindful of the fact that the use of these underspends needs to be
reinstated into the next year.  It is proposed that we use £13.000 million of the loan
charges underspend in the final year of this 3-year Strategy, which will require
reinstatement into 2028/2029.  This is illustrated in Table 8.     
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Budget Gap 2025/2026 to 2027/2028
(June 2024, Executive Committee)
22.355 24.515 30.405 77.275
Less
Council Tax and Utilities 
(Table 1 / Section 4.8) 
5.900  -  -  -
Revised Budget Gap 16.455 24.515 30.405 71.375     
Loans Fund and Service
Concessions Savings (Table 6)
(6.600) (6.000) (3.600) (16.200)
154

Page 155

8 
Table 8 – Use of Underspends to Support the Budget Gap Beyond 2027/2028 
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
2030 /
2031
£m
Revised Budget Gap (Table 7)
(later years for Illustration) 
30.405  10.000 10.000 10.000
Less 
Loans Fund Review / Service
Concessions (IFRS 16) (Table 6)
(3.600)  (0.300) (1.200) -
Budget Gap after Loans Fund
and Service Concessions 
26.805  9.700 8.800 10.000
Use of Underspends (13.000)  (9.000) (4.495) 0.000
Reinstatement of Underspends -  13.000 9.000 4.495
Budget Gap after Underspends 13.805  13.700 13.305 14.495 
6.17. Assumptions have been made on a base Budget Gap in each of the years 2028/2029
to 2030/2031, for illustration purposes (£10 million). 
6.18. Table 8 shows that using the £13.000 million in the last year of the current 3-year
Strategy (2027/2028) reduces the Budget Gap to £13.805 million in that year.  The
impact of reinstating the use of £13.000 million into 2028/2029 and how that can be
managed by using the remaining loan charges underspend until 2030/2031, is also
demonstrated in Table 8. The use of the underspends and their reinstatement has no
impact on the Budget Gap overall but gives the benefit of being able to smooth the
savings requirement across years. 
7. Three Year Budget Position – 2025/2026 to 2027/2028
7.1. As mentioned at section 3.1, the Budget Gap for the three-year period 2025/2026 to
2027/2028 was previously reported as £77.275 million.  Taking into account the
budget reduction for 2025/2026 for Council Tax and Utilities, the Revised Budget
Gap for the three-year period is now £71.375 million, as illustrated in Table 9.   Table
9 also shows the savings presented in Appendix 1 for illustration, as well as the
options available from the Loans Fund Review / Service Concessions (IFRS16)
(Table 7, section 6.14) and the proposed use of underspends (Table 8, section 6.16). 
Table 9: Revised Three Year Budget Gap 
2025/26
£m
2026/27
£m
2027/28
£m
Total
£m
Budget Gap 
(Executive Committee, June 2024) 
22.355 24.515 30.405 77.275
Reduction for Council Tax and Utilities
(Table 1 / section 4.8) 
(5.900)    (5.900) 
Revised Budget Gap  16.455 24.515 30.405 71.375     
Savings Presented (Appendix 1) (10.663)  - - (10.663)
Loans Fund and Service Concessions
Savings (Table 7) 
(6.600)  (6.000) (3.600)  (16.200) 
Use of Loans Fund Review
Underspends (Table 8) 
(13.000)  (13.000) 
Total  (0.808) 18.515 13.805 31.512  
155

Page 156

9 
7.2. £71.375 million budget gap over 3 years still represents a significant Budget Gap to
address over this time period and should be reflected on when considering budget
decisions for 2025/2026.  As illustrated in Table 9 if proposals around savings and
loans fund review were accepted , the budget gap remaining for the three years would
be £31.512 million 
8. Summary of the 2025/2026 Budget Position including Options and Next Steps 
8.1. The Original Budget Gap for 2025/2026 was £22.355 million (section 3.1).  Reductions
in the Budget required for Utilities along with increased income from Council Tax
reduce the Budget Gap by £5.900 million (section 4.8, Table 1).  This results in a
Revised Budget Gap of £16.455 million.   
8.2. The Savings pack in Appendix 1 totals £10.663 million (section 5.2, Table 2).  This is
presented for Members’ consideration. 
8.3. As noted in section 5.4, Education Resources have identified the potential to remove
additionality teachers that are over and above their core staffing model.  This could
have helped address the Budget Gap by £2.300 million in 2025/2026.  No proposal
has been included in the savings pack in Appendix 1, on the basis that it affects teacher
numbers and there remains uncertainty regarding the potential impact on the
Government Grant if teacher numbers were to be reduced (section 5.7). 
8.4. Section 6 of this paper includes savings proposals in relation to the Loans Fund
Review / Service Concessions. The proposal to remove Additional Voluntary
Repayments in terms of loan debt, and to apply IFRS16 to the Council’s Service
Concession arrangements (PPP) would help address the Budget Gap by £6.600
million in 2025/2026.  This position includes the additional interest costs due when not
making the Additional Voluntary Repayments (section 6.7).  This proposal would not
affect core services of the Council.   
8.5. The potential impact of the Loans Fund Review / Service Concessions proposals
beyond 2025/2056 are also detailed in section 6.  This includes proposals in relation
to the use of underspends generated. 
8.6. Table 10 shows the revised Budget Gap of £16.455 million for 2025/2026, after taking
account of the budget reductions for Utilities and Council Tax budget (section 4.8 /
Table 1).  The Loans Fund Review / Service Concessions proposals (section 6.12)
and the saving proposals of £10.663 million (Appendix 1), are presented below Table
10 for information.   
The 3-year Budget Gap of £71.375 million (Table 9, section 7.1) represents a
significant Budget Gap to address over this time period and should be reflected on
when considering budget decisions for 2025/2026.    
156

Page 157

10 
Table 10 – Impact on the Budget Gap 
2025/2026
Savings
£m
Original Budget Gap  22.355
Less  Council Tax and Utilities 
(Table 1, section 4.8)
(5.900)
Revised Budget Gap 16.455
Total Savings (Appendix 1)  (10.663)
Savings from Loans Fund Review / Service Concessions
(Table 6, section 6.12)
(6.600)  
Total  (0.808) 
8.7. Council Tax:  The ability to increase Council Tax as a lever to manage the Budget
Gap is an alternative to making savings.  Each 1% increase in Band D would generate
successive amounts of £1.580 million.  It should be noted that in arriving at the original
Budget Gap of £77.275 million across the 3 years (£23.225 million for 2025/2026), no
account has been taken of any potential increase in Council Tax.  Any increase in
Council Tax will help address the Budget Gap.   
8.8. It should be noted that South Lanarkshire continues to have the lowest level of Band
D council tax in mainland Scotland at £1300.81.  The average for mainland Scotland
is £1428.36.   
8.9. Members can choose to freeze Council Tax or, increase Council Tax Band D. The
impact of a number of percentage increases is shown in Table 11, as an illustration. 
Table 11 – Council Tax Increases  
Percentage
Increase 
Band D 
Council Tax 
£
Annual
Increase 
£
Monthly
Increase
(over 10
Payments)
£
Decrease in
Budget Gap 
£m
0% 1300.81 - - -
1% 1313.81 13.00 1.30 1.580
5% 1365.85 65.04 6.50 7.900
10% 1430.89 130.08 13.00 15.800 
8.10. Timeline:  The timeline for the Budget process, is detailed in Table 12. 
Table 12 – Proposed Timeline 
Timeline
Budget Consultation 13 November 24 –
mid January 25
Receive Local Government Settlement for 2025/2026  12 December 2024
(estimate)
Update the Budget Strategy for Members (post Settlement)  January 2025
Set Council Budget for 2025/2026 and Strategy for
2026/2027 and 2027/2028
February 2025
157

Page 158

11 
8.11. Budget Consultation and Context: The financial challenges being faced by the
Council and the operational changes that transformational change will bring, mean
that clear communication is essential. The communication and consultation process
for the 2024/2025 Budget worked well, and a similar approach will be implemented for
the 2025/2026 Budget.   
8.12. With regard to consultation with the public, the consultation process will commence
following this meeting of the Executive Committee (13 November 2024), and will run
for two months, until mid-January 2025. Initial Budget communications have
commenced and will continue during the period of the budget consultation.  These
communications explain the Council’s financial position and give context to the level
of savings required.  The consultation itself will start by setting the scene for the Budget
and again will provide the financial backdrop in relation to the £77.275 million Budget
Gap across the 3-year period and will provide context to the proposals that the public
will be asked to comment on.  The public will then be asked for a view on each of the
individual saving proposals specifically. Once the consultation process is complete,
feedback on the savings consultation will be presented to Members for their
consideration. 
8.13. Meetings are taking place with the Trade Unions to advise of the Budget process
and the savings exercise that is ongoing.   
9. Reinstatement
9.1. Table 13 re-presents the year of reinstatement of the impact of any previous year
Budget decisions (previously presented in June 2024).  Importantly, as the
reinstatements fall within the years 2026/2027 and 2027/2028, then they are
included in the Budget Gap for those years previously quoted in the June 2024 paper
to Executive Committee on the Budget Strategy (the total Budget Gap of £77.275
million).   
Table 13:  Temporary Solutions / Reinstatement 
Year of Adjustment
2026 /
2027
£m
2027 /
2028
£m
2028 / 
2029
£m
2025/2026 Corporate Solutions   
Service Concessions 
One-off use of Reserves (2025/2026)
Reinstated into 2026/2027
(Executive Committee, November 2022) 
15.100  -  -
Reduction in Employers’ Pension Contribution
Reinstated into 2026/2027
(Executive Committee, November 2023) 
Offset by further use of Reserves in 2026/2027
(reinstated in 2027/2028) 
23.500 
(17.700) 
-
17.700 
-
2024/2025 to 2026/2027 Solutions   
Use of 2023/2024 Probable Outturn Monies £6.000
million used across 2024/2025 to 2026/2027 at £2.000
million per annum
(Executive Committee, November 2023) 
- 2.000  -
Reduction in LVJB Requisition
Reinstatement in 2027/2028 of temporary reduction.
- 0.200 -
Total Temporary Solutions 20.900 19.900 -
158

Page 159

12 
9.2. Table 13 shows that the last year of reinstatement monies is 2027/2028 – there is no
requirement to reinstate temporary solutions beyond the period of this financial
strategy.  This Table does not assume the use or reinstatement of the Loans Fund
Review Underspends (proposed in section 6.14 / Table 7). 
10. Employee Implications
10.1. The employee implication of each of the proposed savings is detailed in Appendix 1. 
115.35 FTE posts are proposed to be removed as part of the savings proposals. 
This affects 191 employees.   
10.2. The process of achieving savings where employees will be affected will involve a
review of vacant posts, voluntary redeployment, and where appropriate the
application of the Council’s Switch 2 policy to support displaced employees. 
11. Financial Implications
11.1. The financial implications are summarised within the report. 
12. Climate Change, Sustainability and Environmental Implications 
12.1. As agreed at the Climate Change and Sustainability Committee (20 September 2023),
a Sustainability Impact Assessment will be completed in respect of the Revenue
Budget process. The impact assessment process aims to ensure that we continue to
ensure that factors related to carbon reduction, climate change adaptation and the
wider principles of sustainable development are included within Revenue Budget
process.  This assessment of each saving and the budget strategy will form part of the
Integrated Impact Assessment (refer section 14).   
13. Other Implications
13.1. The Budget Strategy approved in June 2024 is a key tool in managing a number of
key risks which directly impact on the money available to deliver Council objectives.   
13.2. The main risk area, where the Council has made assumptions which have a significant
impact on the Budget going forwards, are on the level of grant which we will receive,
as well as any general pay, demand or price increases / inflation assumptions currently
unknown.  These have been estimated, as far as possible and are included in the
Budget Gap referred to in this paper.  Also, the level of new build properties and,
therefore, Council Tax Income generation is based on best information at the time of
writing.  Any movement in these assumptions would be a risk to the Budget.   
13.3. Specific risks for the Budget are detailed in Appendix 5.  These detail specifically the
areas of uncertainty in the Budget.  It should be noted that any movement in these
areas could be detrimental to the Council’s financial position and could increase the
Budget Gap.       
13.4. Level of Support Provided to the Integration Joint Board (IJB) and South
Lanarkshire Leisure and Culture SCIO (SLLC):  The Council’s Budget Strategy for
2025/2026 to 2027/2028 at this stage assumes no additional allocation of monies
from the Council to the IJB.  It is for the IJB and SLLC to produce their own balanced
budgets.    
159

Page 160

13 
13.5. For SLLC, a saving of £1.000 million has been assumed in their utilities costs and is
as part of the savings pack proposed in Appendix 1.  This budget is held by the
Council so there is no impact of this saving on the SLLC Management Fee.  No
further savings have been requested of SLLC at this time.   
14. Integrated Impact Assessment and Consultation Requirements 
14.1. Integrated Impact Assessments have been undertaken for the individual Savings and
the Budget as a whole.  These have been issued to Members to assist in the decision-
making process and will be updated following the Budget Consultation (timescales
detailed in section 8.12). 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
31 October 2024 
Link(s) to Council Values/Priorities/Outcoems
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024   
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Jackie Taylor, Executive Director, Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637)   E-mail : jackie.taylor@southlanarkshire.gov.uk
160

Page 161

14 
Appendix 1 
Approved Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
APP01 Facilities,
Waste and
Grounds
Waste Permits 
The Executive Committee, on 26 June 2024, approved the proposal to introduce a charge for the
uplift of burgundy bins containing garden waste. 
The cost of the permit is £45 per annum and will allow a resident to present one burgundy bin
containing garden waste on each scheduled collection day until the end of that financial year. 
Net income, after deducting costs of the Service, is £0.500 million in 2025/2026 with an additional
income in 2026/2027 of £0.875 million. 
- 0.500 
Total Approved Savings  -  0.500
161

Page 162

15 
Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O01 All Procurement 
This proposal sees efficiencies and savings generated through a focus on demand management
opportunities (buying less or not at all), alternative product specifications and new routes to market. 
Opportunities have been identified for inclusion in the 2025/2026 budget strategy outlined below: 
The total savings proposed for 2025/2026 is £0.955 million. 
- 0.955
M&O02 All Overtime 
Resources have been working in conjunction with Personnel Services to prepare action plans to
meet the outcomes associated with reducing overtime across the Council. 
Through removing enhanced overtime expenditure and reducing and containing plain time overtime
expenditure, savings of £0.364m can be realised in 2025/2026.  This is summarised across
Resources in the table below. 
Resource / Service  2025/2026 
Saving
Community and Enterprise £0.125m
Finance and Corporate £0.030m
Housing and Technical  £0.150m
Social Work  £0.059m
Total £0.364m 
- 0.364
162

Page 163

16 
Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
M&O03 All Management Structures 
This proposal considers spans of control across all Resources in order to review the number of
management and supervisory posts. This is to ensure consistency in the balance of managers and
front-line staff as well as to identify and remove any anomalies with direct Grade to Grade reporting. 
Services were identified which currently operate with lower spans of control than what is
recommended by the Preferred Operating Model. In these service areas, efficiencies can be
realised by aligning more closely with the model, while also ensuring consistency across Resources
in terms of management workload and responsibility.  This will realise savings totalling £1.000m in
2025/2026. 
It is anticipated that this will affect 16.85 FTE. 
16.85 1.000 
M&O04 Property Reduce Corporate Accommodation
The closure of Montrose House has allowed savings of £0.250m to be realisable in 2025/2026 from
property costs associated with the building. 
In addition, efficiencies will be realised in 2025/2026 from the lease agreement with NHS for
occupation of Brandongate, Hamilton. A saving of £0.112m is achievable from the lease terms
including income from a share of rent, service charges and cleaning costs. 
The total savings proposed for 2025/2026 is therefore £0.362 million. 
- 0.362
M&O05 All Salary Sacrifice Shared Cost Additional Voluntary Contributions (SCAVCs) 
Local Government Pension Scheme (LGPS) members are currently permitted to contribute to a
standard Additional Voluntary Contribution (AVC) scheme and receive Income Tax relief on their
contributions. 
- 0.088
163

Page 164

17 
Management & Operational Savings 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
An employer can also decide to contribute to the employee’s AVC arrangement, this is known as a
shared cost AVC (SCAVC). There are financial benefits to introducing a salary sacrifice SCAVC
scheme as both the employee and the employer make savings on National Insurance (NI)
contributions.
Based on the current number of employees who pay AVCs, there will be a net saving to the Council
of £0.088m per annum from adopting the scheme from 2025/2026. 
M&O06 All South Lanarkshire Leisure and Culture Utilities 
Recent information has suggested a downward trend in prices in 2024/2025.  The Council is a
member of the buying consortium who purchase wholesale energy in advance, on behalf of
ourselves and other public sector bodies. The price indications specifically for electricity purchased
for the next couple of years indicates further price reductions beyond that assumed for 2024/2025. 
This allows an estimated saving of £1.000 million in 2025/2026 in relation to South Lanarkshire
Leisure and Culture utility costs. 
- 1.000 
Total Management & Operational Savings  16.85  3.769
164

Page 165

18 
Savings for Approval 
Council Wide 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
COR01 All Council Charges 
The cross-cutting review of Council charges has looked at all charges made by the Council and the
basis for their charge, specifically those not recovering their costs.  It has also, considered whether
the increase in our charges over recent years has kept in line with the trend in inflation.   
This exercise identified that where an inflationary rise has been applied over the last 5 years this
has not followed actual UK inflation.  In general, we have applied around 16.8% whereas inflation
across the UK has been closer to 33.6%.  To bring us in line approximately 14.4% would be
required to be applied in a single year.  It is therefore proposed to apply an inflationary increase of
14.4% across all charges that are not statutory or covered by other reviews plus 1.5% year on year
inflation to calculate new charges for 2025/2026.  This would generate £0.190m of additional
income. 
In addition, it is proposed to apply an inflationary increase across parking tariffs from 80p to £1 for
the lower charge and rising by an equivalent percentage increase across longer stay parking tariffs
and season tickets. This would generate £0.185m of additional income. 
The total savings proposed for 2025/2026 is therefore £0.375 million. 
- 0.375 
Total Council Wide  -  0.375
165

Page 166

19 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER01 Enterprise and
Sustainable
Development 
Christmas Events (Re-presented) 
This option would see a budget reduction due to removing the Christmas Switch-On events. The
Council currently supports six switch-on events across South Lanarkshire, in Hamilton, East
Kilbride, Rutherglen, Cambuslang, Lanark and Carluke. This proposal would remove the events
programme. There would be no council provided Christmas events in town centres.   
This savings proposal would remove all the budget for this area (£0.045m). 
- 0.045
CER02 Enterprise and
Sustainable
Development
Christmas Trees and Lighting (Re-presented) 
The proposal is a budget reduction to rationalise trees and festive lighting to eight main
geographical areas:  Hamilton, East Kilbride, Rutherglen, Carluke, Blantyre, Cambuslang, Larkhall
and Lanark. 
This savings proposal would remove all the budget for this area (£0.037m). 
- 0.037
CER03 Grounds Weedkilling (Re-presented) 
This proposal will reduce weedkilling from 2 applications to one per annum. 
The reduction applies across all current areas of hardstanding, shrub beds and grass edges.  There
will be greater weed growth over the growing season. 
This will affect 15 employees (14.5 FTE). 
14.5 0.510
CER04 Grounds Support for Gala Days (Re-presented) 
This proposal would see the removal of grounds staff supporting gala days.  This includes costs of
bunting and the costs of overtime for staff supporting gala days.  
- 0.055
166

Page 167

20 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
CER05 Streets Mechanical Sweeping – Small (Re-presented) 
There would also be a reduction in the number of smaller Swingo vehicle used on footpaths, shop
fronts and town centres and some roads within housing areas and industrial estates. (27%
reduction in vehicles).  This will mean less street sweeping.  Remaining vehicles will be targeted to
high footfall areas.   
Smaller fleet will mean means less resilience in ad hoc / urgent response situations. 
This will affect 6 employees (6 FTE). 
6.0 0.285
CER06 Streets  Litter collection (Re-presented) 
This proposal would see a 10% reduction in litter picking and bin emptying.  The saving would
include staffing and fleet vehicles.  Bin infrastructure is being looked at to reduce numbers of bins
but increase capacity.   
This will affect 10 employees (10 FTE). 
10.0 0.255
CER07 Roads,
Transportation
and Fleet
Precautionary Footway Gritting 
We currently treat ‘precautionary’ footways ahead of freezing conditions. 
Beyond that our approach is reactive, treating ‘accessibility’ and ‘other’ routes during periods of
extended severe weather as resources allow. 
Currently, we treat 3.38% of our footways on a precautionary basis and this proposal would involve
a cessation of the current practice to instead involve reactive footway treatment only in response to
severe conditions. There would be potentially increased risks of accidents occurring due to potential
falls on slippery pavements.   
- 0.300
167

Page 168

21 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
It is understood that several other Scottish local authorities take this approach including
Renfrewshire, North Ayrshire, Inverclyde, Moray, Argyll & Bute, West Lothian, Fife, and Perth &
Kinross. 
CER08 Roads,
Transportation
and Fleet
Carriageway Gritting 
The Council’s core carriageway gritting service treats our ‘precautionary’ routes prior to the forecast
onset of freezing conditions or snow. 
Currently, low season routes are treated during winter low season (normally October and April), with
more comprehensive high season routes being treated from November to end of March. High season
routes equate to circa 49% of the road network and low season routes equate to circa 30% of the
road network. 
The Scottish average is 45% and indicates that we presently deliver an above average level of
service.   This proposal would be to move to the Scottish average. 
A change to treating only the Scottish average during high season would inevitably see some roads
removed from our routes leading to an associated risk of increased accidents, however we would still
be treating 45% of the network (a reduction of 4%). 
- 0.130
CER09 Roads,
Transportation
and Fleet
Grit Bins 
The provision of grit bins has a limited effectiveness on snow and ice clearance, however, to facilitate
self-help we provide over 3,000 grit bins across our communities.   
In severe weather these bins empty quickly and demands for refilling peak. Refilling exercises are a
substantial operation and frequently require successive visits across locations. This is a laborious,
costly, and very resource intensive operation. The Service feel that this is not the most productive of
the winter service provision. 
This proposal would be to reduce / rationalise the number of grit bins by 25% across our communities
through the development of tighter criteria for the placing of grit bins.  These criteria will continue to
- 0.065
168

Page 169

22 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
take account of the following factors: roads below a specified gradient won’t qualify for a grit bin, and
the distance from the nearest grit bin will also be taken into consideration. 
CER10 Enterprise and
Sustainable
Development
Business Support 
One-off income relating to Business Support activity has been identified amounting to £2.251m.  It is
proposed that this income is used to fund revenue costs for a re-aligned Business Support Team
including four existing posts within Enterprise and Sustainable Development Service where funding
comes to an end in March 2025.  The income streams will also fund Business Growth Grants, Expert
Help Consultancy and Inward Investment for a 3-year period. 
The Business Support Team will undertake activities in a different way where Expert Help
Consultancy Support will be provided via Business Gateway which together with the cessation of
Micro Business Grants, will provide a saving of 1 x Grade 3 post (currently vacant). The criteria for
Business Growth Grants have also been strengthened to ensure the Grants achieve maximum
outcomes. The Property Advisory Service will be undertaken by the newly integrated Inward
Investment Team. 
There is also a potential income stream from Business Loans Scotland (BLS).  The Scottish
Government has advised that there will be no funding for 2024/2025 and an available option for Local
Authorities is to withdraw from BLS. For South Lanarkshire Council, this option would release at least
£0.500m. 
The Review has identified that a saving of £0.409m can be made from core funding on a temporary
basis (3 years).  The one-off income can be used to cover the cost of the revised service delivery
model. 
Reinstatement of £0.353m will be required in 2028/2029. When the one-off income comes to an end,
the Service will be required to align ongoing activities to accommodate this. This relates to inward
1.0 0.409
169

Page 170

23 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
investment and business growth grants and identifying additional funding to support the wider
Enterprise and Sustainable Development posts. 
CER11 Facilities,
Waste and
Grounds
Grounds / Grass Cutting 
This proposal would see a reduction in the grass cutting specification for low and high amenity
areas. 
The Grounds Service maintains all Council owned open space - 55 public parks, including 11
District Parks.  Grounds maintenance work is seasonal and grass cutting is undertaken during the
summer months. 
The proposal is to reduce the frequency of grass cutting as per the table below: 
High Amenity Low Amenity
14 cuts (from 18) 7 cuts (from 14) 
Low amenity areas include public open space, residential grassed areas and industrial areas.  This
category has the vast majority of land at approximately 11 million m2. Grass is cut in low amenity
areas 14 times per year and collection only occurs in a small number of these areas. 
High amenity areas cover approximately 635,000 m2 and include cemeteries, high footfall areas,
public buildings, sports pitches and country park lawn areas. These areas are cut 18 times per year
and the grass is collected as part of the service. This proposal does not include cemeteries. 
This will result in a saving of £1.020m in 2025/2026. It will mean that grass will be much longer
between cuts and the general maintenance appearance will differ from current specification.  Grass
36.0 1.020
170

Page 171

24 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
arisings will be left on the surface of those areas cut as grass collection will only remain in
cemeteries. 
This saving will mean an estimated reduction of 36 FTE (impacting up to 72 employees). 
CER12 Facilities,
Waste and
Grounds
School Meals 
This proposal would see Primary School and Secondary School meal charges rise by 21% and
18% respectively for the year 2025/2026. 
In 2023/2024, the Service delivered 2.9 million Primary School meals and 1.4 million Secondary
School meals. Over recent years, school meal prices have been subject to small inflationary
increases; however, South Lanarkshire Council’s charges, which are amongst the lowest in
Scotland, haven’t kept up with the level of increases experienced in food costs and other
operational costs. 
Based on 2023/2024 actual costs, the cost of production of a Primary School Meal is £3.52, and
£3.69 for Secondary Schools. South Lanarkshire Council currently charges £2.17 for Primary
School meals and £2.40 for Secondary School meals. 
In addition to this, in August 2021, Universal Free School Meals (UFSM) was introduced for P4 and
in January 2022 extended to P5 primary school pupils. Further roll out of the UFSM programme will
continue in February 2025 to pupils in P6/P7 who are in receipt of the Scottish Child Payment. It is
unclear when UFSM will be rolled out to remaining primary school pupils. 
In order to minimise the impact of necessary increased charges, the proposed price increases
would be implemented from 2025/2026 as shown overleaf: 
- 0.400
171

Page 172

25 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
Current
Charge
Proposed
Charge
Primary £2.17 £2.62
Secondary £2.40 £2.83 
It is anticipated that this proposal will generate additional income of £0.400 million in 2025/2026. 
There is the option to increase charges further in future years to better reflect the cost of delivering
the service. 
A summary of school meal pricing across Scotland is shown in the table below. 
SLC  Scottish
average 
Highest Lowest 
Primary £2.17 £2.30 £3.25 £1.08
Secondary £2.40 £2.45 £3.30 £1.08 
Full details of school meal prices for 2024 are detailed in Appendix 2. 
CER13 Facilities,
Waste and
Grounds
Building Cleaning (Schools) 
This proposal concerns reducing the cleaning specification for schools. 
Facilities Services provides a building cleaning service to all nursery, primary and secondary
schools on behalf of Education Resources. 717 (314 FTE) employees deliver the cleaning service
across the school estate based on a cleaning specification consisting of a number of tasks and
appropriate frequencies. 
25.0 0.250 
172

Page 173

26 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
The Service is a member of APSE Building Cleaning performance network and participates in an
annual benchmarking exercise across Scotland and the broader UK. One of the key measures is
the cleaning productivity rates and in 2022/23, South Lanarkshire Council scored the third highest
rate in Primary Schools and second highest in Secondary Schools within the family group,
demonstrating that resources are being utilised efficiently. APSE data is shown in the table below
with the productivity rate measure in square metres cleaned per hour. 
South
Lanarkshire
Family Group National
Primary school 208 174 190
High school 246 205 197 
A summary of the proposed reductions is shown in the table below. 
Task/ area Current frequency Proposed frequency
Damp dusting 4 days per week 2 days per week
High level dusting 4 weekly Monthly
Spot cleaning of walls 5 days per week Monthly
Electrostatic spraying Weekly Monthly
Staff bases, meeting rooms,
medical rooms 4 full cleans per week One full clean per week
with daily check clean 
173

Page 174

27 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
It is anticipated these reductions in cleaning specification would generate a financial saving of
£0.500m phased over a 2-year period (£0.250m in 2025/2026 and £0.250m in 2026/2027),
reflecting the implementation from August 2025. 
This would see a reduction of 25 FTE (62 employees).  The reduction in cleaning specification will
mean a reduction of 925 cleaning hours across all schools. This will likely require
reprofiling/changing hours across the whole estate and potentially affect 717 cleaning employees. 
CER14 Facilities,
Waste and
Grounds
Income Generation (Bereavement) 
This proposal would see the implementation of an above inflationary price increase of 10% across
all Bereavement Service charges. 
The Grounds Bereavement Service provides a dignified and sensitive burial and cremation service,
which over recent years, has seen Service charges subject to inflationary increases. 
In order for pricing to remain competitive and appropriate, a benchmarking exercise was carried out
for the year 2024/2025, reviewing Scottish Bereavement Service charges. The table below, shows
how the current and proposed service charges compare to the average price charged by 5 of South
Lanarkshire Council’s neighbouring authorities for the year 2024/25. 
Service Line SLC Price
(2024/2025)
SLC Proposed
Price
(2025/2026)
Neighbouring
Council Average
Price
(2024/2025)
Cremation £857 £943 £953
Right of Burial £1,387 £1,526 £1,316
Coffin Internment £1,013 £1,114 £1,230 
- 0.250
174

Page 175

28 
Community & Enterprise Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
Given the level of proposed increase, an assumed small reduction in demand has been factored
into the overall additional income. The proposed increase of 10% would generate additional income
of £0.250m. 
Total Community and Enterprise Resources  92.5  4.011
175

Page 176

29 
Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
EDR01 Early Years/
Primary/
Secondary/
ASN 
Per Capita / Devolved School Management Spend (Re-presented) 
This saving proposes a reduction in the per capita allocation to Early Learning and Childcare (ELC)
/ primary and secondary schools (i.e. the amount we provide to establishments to spend per pupil).   
Total “per capita” spend is £3.5m.  This allowance has been subject to savings in recent years,
particularly as part of procurement efficiencies.  The consequences would be that the ability for
establishments to spend on classroom materials and resources would be reduced.   
A 14% reduction in per capita allocation of £0.480m will give a per pupil allocation of £21.81
primary, £90.90 secondary, £723.55 ASN and £74.69 ELC based on census 2023 pupil numbers. 
- 0.480
EDR02 Secondary Mentoring and Learner Journeys 
The South Lanarkshire Council Enhanced Personalised Support Programme (EPSP) operates
across all 17 mainstream Secondary schools and Kear Campus School. Its purpose is to support
vulnerable young people in S1-S4 to attain and to remain in education beyond S4 and to move into
a positive destination. 
The EPSP currently has 4 mentors (4.0FTE) each working one day per week per school to provide 
personalised support for identified young people with their learning and pathways. 
There have been recent changes to the existing MCR Pathways model, with coordinators able to
work across more than one school.  As a result of these changes, the EPSP programme can be
removed on the basis that the reduction in service is mitigated by the extension of the MCR
programme.  A saving of £0.191m is achievable in 2025/2026. 
4.0 0.191
176

Page 177

30 
Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
EDR03 Support  Primary School Breakfast Clubs 
Within South Lanarkshire, primary school breakfast club provision operates from 8.15am to 8.45am
and is currently universally free of charge to all. This allows children the opportunity for a healthy
breakfast and a good start to the school day. 
It is recognised that for many parents this service also acts as childcare allowing them to get to
work. The majority of other councils who operate breakfast clubs charge a fee. 
It is proposed that in order to retain the service, rather than to reduce or remove it, that a charging
policy is implemented. 
The proposal is to charge a flat rate of £1.50 per child, with an exemption being applied where the
child is entitled to free school meals by financial assessment. This would potentially generate
income of up to £0.590m in a full year. 
However. this would require the introduction of an administrative process, administered by 1 FTE
Grade 1, costing £0.030m. 
The full year net annual saving would then equate to £0.560m, however if implemented from
August 2025, there will be a part year saving of approximately £0.350m in 2025/2026 with a further
saving of £0.210m in 2026/2027.   
(1.0) 0.350
EDR04 Secondary Instrumental Music Service (IMS) 
The Instrumental Music Service, a non-statutory service, provides music tuition for young people in
South Lanarkshire schools.  The service is funded from core Council budget and external funding
from both Creative Scotland and Scottish Government. 
It is proposed to reduce the current establishment of 29.5 FTE music instructors by 3 FTE (10%)
realising a saving of £0.184m per annum.
3.0 0.272
177

Page 178

31 
Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
In addition, a 40% reduction in materials budget is proposed yielding a saving of £0.088m per annum. 
The loss of instrumental teaching days will be achieved through a wholesale realignment of IMS
provision allocated to learning communities and a restructure of IMT timetables. Existing school music
resources will be utilised to accommodate the reduction in materials. 
EDR05 Early Years Charging for Early Years (Nursery Fees) 
This proposal considers increased Early Learning and Childcare Service (ELC) fees, out with the
statutory levels of childcare provision. 
The Council currently allows parents to purchase extra hours where there is availability within an
ELC establishment at a current cost of £3.76 / hr.  This may be in relation to wrap around hours in
nursery classes, hours in excess of the 1140 hours in standalone establishments and non-exempt
0–3-year-olds.   
ELC fees are increased annually in line with the Council charging policy which increases fees in line
with the level of inflation. This proposal is to increase fees from April 2025 to align with other local
authorities based on a benchmarking exercise (Table 1), following the increase already applied
from April 2024. 
- 0.217
178

Page 179

32 
Education Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m 
Table 1 – West Partnership 2023/24 ELC Fees (inc. SLC) 
Local Authority £ph
2023/24
East Renfrewshire 3.40
South Lanarkshire 3.76
Renfrewshire 3.85
North Lanarkshire 4.16
Glasgow 4.50
Inverclyde 4.50
East Dunbartonshire 4.68
Average hourly rate of 6 Western
Partnership authorities 4.18 
Based on an increase aligned to the Western Partnership average rate of £4.18 per hour, the
financial implication of a change to the charging policy would result in increased income of £0.217m
in 2025/2026. 
A costing exercise, carried out to understand the unit cost per hour of ELC provided by the Council,
shows that a rate of £4.18 would still be subsidised as the current cost of Service provision has
been calculated to be £5.33 / hr. 
Total Education Resources  6.0  1.510
179

Page 180

33 
Finance and Corporate Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
FCR01 Admin, Legal
and Licencing
Voluntary Grants, Community Grants, Gala Grants and Civic Hospitality 
Following the setting of the Council’s Budget in February 2024, a saving of £0.270 million was
agreed and the Council invested £0.270 million as transitional funding for 2024/2025, on a one-off
basis, to delay implementation of the revised saving until the 2025/2026 financial year. 
Further savings of £0.180 million have been identified, taking the total savings achievable from
2025/2026 to £0.450m. 
At present, unused grant funding is held within the Council’s Reserves with a total of £0.313 million
anticipated to be held at the end of 2024/2025.  It is proposed to utilise the reserves of £0.313
million to delay implementation of the revised savings further until the 2026/2027 financial year. 
As a result, a reduction in grants budget of £0.137 million will be implemented for
2025/2026.  Appendix 3 shows the way that the reserves can be used to minimise the impact of last
year’s savings and this year’s additional proposed saving by using reserves. Only 7 organisations
would see a reduction in funding into 2025/2026 and it is considered that withdrawal of funding from
these organisations is likely to have only a moderate negative impact on service users, and that
alternative funding sources are available. 
The full reduction in grants of £0.450 million will be realised from 2026/2027.  The proposals for that
year will reduce the level of voluntary grants, gala grants, community grants and civic hospitality.   
A full list of those grants affected in both 2025/2026 and 2026/2027 is provided in Appendix 3. 
- 0.180 
Total Finance & Corporate Resources  -  0.180
180

Page 181

34 
Housing & Technical Resources 
Reference Service Name and Brief Description of Saving FTE
(25/26)
Saving
25/26
£m
HTR01 Housing Sheltered Housing – Housing Support Funding to Registered Social Landlords (RSLs) 
The Council currently provides housing support funding to two RSLs, Hanover Housing Association
and Trust Housing Association.  Removal of direct funding to RSLs, in line with the national trend
over the past 15 years, would secure efficiencies of £0.692m from 2025/2026. 
This will be achievable across two financial years with £0.300m available in 2025/2026 and
£0.392m in 2026/2027. 
- 0.300 
HTR02 Housing Community Safety Partnership Contribution 
The South Lanarkshire Community Safety Partnership (CSP) is a collaboration of public services
and voluntary organisations that work together to keep people and communities safe. 
An annual contribution to the partnership is provided by the council, with funding received directed
through the partnership’s Safer South Lanarkshire Board. In 2024/25 this funding predominantly
contributed to the costs of three partnership posts:   
• Assistant Police Liaison Officer
• Victim Support Scotland Support Co-ordinator
• Partnership Analyst 
This proposal would see the Council’s contribution to the partnership reduced by £0.018m to
£0.037m in 2025/26, generating a saving of £0.018m for the council. Allocation of this contribution
will continue to be determined by the Safer South Lanarkshire Board.   
- 0.018
Total Housing & Technical Resources  -  0.318
181

Page 182

35 
Savings for Approval FTE £m
Council Wide  - 0.375
Community & Enterprise Resources 92.50 4.011
Education Resources 6.00 1.510
Finance & Corporate Resources - 0.180
Housing & Technical Resources  - 0.318
Social Work Resources - - 
Savings for Approval (before Council Tax)  98.50  6.394  
Approved Savings  -  0.500  
Management & Operational Savings  16.85  3.769  
Total Savings (before Council Tax)  115.35  10.663
182

Page 183

36 
Appendix 2 
School Meal Prices 2024 
Authority Primary
£
Authority Secondary
£
North Lanarkshire 3.25  North Lanarkshire 3.30
West Dumbartonshire 3.04  West Dumbartonshire 3.04
Orkney Islands 2.70  Aberdeenshire 2.85
Aberdeenshire 2.65  Edinburgh, City of 2.80
East Renfrewshire 2.50  Orkney Islands 2.80
East Dumbartonshire 2.43  Shetland Islands 2.75
Fife 2.40  East Renfrewshire 2.70
Moray 2.40  Renfrewshire 2.70
Scottish Borders 2.40  Aberdeen City 2.65
Aberdeen City 2.35  Highland 2.55
Ediburgh, City of 2.35  East Dumbartonshire 2.54
Falkirk 2.35  Dundee City 2.50
Renfrewshire 2.35  East Lothian 2.50
South Ayrshire 2.35  Scottish Borders 2.50
Argyll & Bute 2.30  Stirling 2.50
Highland 2.30  South Ayrshire 2.45
Shetland Islands 2.30  West Lothian 2.43
Stirling 2.30  Argyll & Bute 2.40
East Lothian 2.25  Fife 2.40
Clackmannanshire 2.20  Midlothian 2.40
West Lothian 2.20  South Lanarkshire 2.40
South Lanarkshire 2.17  Perth & Kinross 2.30
Dundee City 2.15  Angus 2.20
Perth & Kinross 2.15  Falkirk 2.05
Angus 2.10  North Ayrshire 2.05
Midlothian 2.10  Dumfries & Galloway 2.00
North Ayrshire 2.05  Glasgow City 2.00
Dumfries & Galloway 1.90  Moray 1.70
Glasgow City 1.90  Inverclyde 1.50
East Ayrshire 1.08  Clackmannanshire 1.35
Inverclyde Free  East Ayrshire 1.08 
183

Page 184

37 
Appendix 3
Grants Information  Grant
Awarded
2024/2025
Grant
Award
2025/2026
(1) 
Proposed
Grant Award
2025/2026
(2)
Proposed
Grant
Award
2026/2027
Voluntary Organisations
Spell £28,263 £14,130  £28,263 £0
Cash for Kids £19,570 £0  £0 £0
East Kilbride Community Transport £5,552 £2,780  £5,552 £0
Lanark YMCA £5,451 £0  £0 £0
Cargill House Club  £5,047 £0  £0 £0
Coalburn Miners Welfare £2,060 £0  £0 £0
Thornton Road Community Centre £7,066 £0  £0 £0
Family Mediation  £6,561 £3,280  £6,561 £0
Particip8 Overton £3,000 £1,500  £3,000 £0
Lanarkshire Cancer Care Trust £7,571 £3,790  £7,571 £0
Lanarkshire Rape Crisis Centre £7,167 £3,580  £7,167 £0
Childcare in the Community £2,221 £1,110  £2,221 £0
Eastfield Physically Disabled Club £404 £0  £0 £0
Hamilton Churches Drop In £505 £0  £0 £0
Milan Centre Social Club  £2,019 £1,010  £2,019 £0
Parent Action Group £3,028 £1,510  £3,028 £0
Special Needs Adventure Playground (SNAP) £3,533 £1,770  £3,533 £0
Clydesdale CAB £52,118 £46,900  £52,118 £39,089
East Kilbride CAB £52,118 £46,900  £52,118 £39,089
Hamilton CAB £54,539 £49,090  £54,539 £40,904
Rutherglen CAB £52,530 £47,280  £52,530 £39,398
Hamilton Information Project for Youth £56,650 £28,330  £56,650 £0
Lightburn Elderly Association Project £55,368 £27,680  £55,368 £0
Unspent in 2024/25 £97,159 £0  £0 £0
Total Voluntary Organisations £529,500 £280,640  £392,238 £158,480
Gala Grants
Lanark Lanimer Day £4,635 £3,360  £4,635 £2,318
Rutherglen Landemar Day £4,223 £3,000  £4,223 £2,112
All other Gala Grants £15,842 £0  £15,842 £0
Total Gala Grants £24,700 £6,360  £24,700 £4,430
Community Grants
Community Groups/Playscheme Grants £103,000 £103,000  £103,000 £58,100
Total Community Grants £103,000 £103,000  £103,000 £58,100
Civic Hospitality
Civic Events £22,600 £22,600  £22,600 £11,300
Civic Gifts £5,000 £5,000  £5,000 £2,500
Total Civic Hospitality £27,600 £27,600  £27,600 £13,800
TOTAL  £684,800 £417,600  £547,538 £234,810
Movement Year on Year (24/25 to 25/26)  £267,200   
Movement Year on Year (25/26 to 26/27)     £182,790
(1) 2025/2026 Grant after 2024/2025 saving approved, (2) Use of Reserves of £0.313m in
2025/2026
184

Page 185

38 
Appendix 4 
Cross-Cutting Review:  Loans Fund and Service Concessions 
1. Introduction
1.1. As reported to the Executive Committee in June 2024, as part of the Transformation
programme to help address the £77.275 million Budget Gap over the next 3 years, the
Council has embarked on a number of cross-cutting reviews. One of these reviews
looks at the Council’s Loan Charges budget, and the repayment of debt through
Service Concessions.   
1.2. Loan charges form a significant element of the Council’s revenue budget. How these
charges, in particular the repayment of debt, are calculated and accounted for can
have a material impact on the amounts charged to the Council’s Revenue Budget. 
1.3. The review has looked at two areas where there is some flexibility in how we account
for loan charges / debt repayments, and that could lead to savings to contribute to the
Revenue Budget Strategy going forward: 
1. Loans Fund Review / Additional Voluntary Repayments
2. Service Concessions (PPP Contractor Payment) and IFRS16 (Statutory
Charge for Repayment of Debt) 
1.4. Sections 2 and 3 will focus on the Loans Fund Review and the options available in
relation to Additional Voluntary Repayments.  This is detailed in Sections 2 to 3. 
Section 4 considers the options available in relation to Service Concessions payments
as a consequence of implementing IFRS16.   
2. Loans Fund Review/Additional Voluntary Repayments
2.1. In 2019 a review of the loans fund was carried out which looked at how the borrowing
from the Loans Fund to fund the capital programme was repaid. By extending the
period over which the borrowing was repaid and applying this revised approach, it was
identified that £68 million of loans fund advances had been repaid earlier than it would
have been under the revised approach.  In addition to the historic overpayment, by
repaying advances over a longer period of time, the annual charge in future years was
also reduced with a further potential benefit of £198 million to 2046/2047 in reduced
principal repayments. 
2.2. While the Council could repay the advances over a longer period of time, this meant
that additional interest costs would be incurred as the debt outstanding would remain
higher for longer.  An alternative approach was identified that would allow the Council
to limit the benefit to the £68 million that had been historically overpaid. This approach
involved making additional voluntary repayments of debt totalling £198 million which
in turn reduced the additional interest costs.  This was the approved position in June
2020 (Executive Committee). 
2.3. Given the further budget pressures being faced by the Council in the coming years,
this paper revisits the additional voluntary repayments with a view to lowering the loan
charges spend across the medium term which means savings can be made.  The
impact on interest payments has also been considered as part of this review. 
185

Page 186

39 
2.4. It is noted that 5 years on from the start of the original Loans Fund Review, and
following changes to the phasing of borrowing for the General Fund capital
programme, the profile of additional voluntary repayments has changed from that
reported to Committee in 2020.  The planned voluntary repayments now total £193.555
million from 2025/2026 to 2046/2047.   
2.5. The voluntary repayments are used by the Loans Fund to repay external debt, so not
making these repayments means that the Council’s external debt will not be repaid as
quickly as it would have been, resulting in additional interest costs. The additional
interest costs have been calculated as £185.637 million over the period from
2025/2026 to 2061/2062 and these are included in the Strategy proposed.  The profile
of these interest repayments is provided in Annex A (column c).  For information, the
interest costs total £185.637 million across the years 2025/2026 to 2061/2062, and
these are included in the Strategy proposed.  At today’s prices, this equates to £97
million. 
2.6. By no longer making these voluntary repayments, then the costs incurred by the
Council will be lower.  The result of this is that we will underspend in our Loan Charges
budget.  The in-year underspends across years are also shown in Annex A (Column
a).  This takes account of the recalculated loan charge payments, the removal of the
additional voluntary repayments and importantly, the impact of the removal of the
voluntary repayments on the interest costs incurred (as referred to in 2.5).  The
recalculations present an underspend of £18.849 million in 2025/2026 but this
underspend decreases into future years to accommodate the profile of debt
repayments and consequent interest charges, as shown in Annex A.   
2.7. The option to remove voluntary repayments is only available from 2025/2026 onwards
due to the fact that they were originally programmed to start in that year.   
3. Loans Fund Review / Additional Voluntary Repayments – Savings Options
3.1. As noted in Section 2.6, Annex A shows the savings achievable in each financial year.
However, as noted, while the savings / underspend starts at £18.849 million in
2025/2026, the level of savings each year thereafter reduces over time therefore, we
cannot take this higher level of savings on a permanent basis.  Instead, it is proposed
that we take a 3-year view of the savings achievable from the review, given the
magnitude of the savings required, and we spread the benefit over the 3 years from
2025/2026 to 2027/2028. 
3.2. It is therefore proposed that a total saving of £14.600 million be taken and spread
across 2025/2026 to 2027/2028.  The proposed phasing of these savings is shown in
Table 1 within Annex B, spreading the savings across the Medium-Term Budget
Strategy.  By smoothing the savings across the years, it avoids having to reinstate
budget into the later years of the Medum-Term Strategy.   
3.3. These budget reductions of £14.600 million would help address the Budget Gap
across the years 2025/2026 to 2027/2028. This would have no impact on services
delivered. 
3.4. There will still be a requirement to increase loan charge budgets after 2027/2028 (as
shown in Table 1, Annex B), but the benefit of £14.600 million can be taken over the
3 years of the Revenue Budget Strategy.  Reinstatement of the budget is required in
2028/2029 (£1.0m) and 2029/2030 (£0.5m) however this can be included in future
186

Page 187

40 
years budget plans and will be offset by anticipated benefits from Service Concessions
(as outlined in Section 4). 
3.5. To reiterate, these figures include the additional interest costs incurred from not
repaying the voluntary repayments (as referred to in Section 2.5).  The interest costs
total £185.637 million across the years 2025/2026 to 2061/2062. 
4. Service Concessions/IFRS16 (Statutory Charge for Repayment of Debt)
4.1. In 2022/2023, the Council applied flexibilities regarding how the debt element of PPP
payments are charged to revenue.  These flexibilities arose from accounting
regulations which removed the restriction that we have to account for these costs
over the life of the contract rather than the life of the asset.  This is different from how
we account for other non-PPP transactions.  By charging debt to the Revenue
Budget over the life of the asset, rather than the contract period, significant one-off
retrospective savings were realised, as well as permanent budget savings.   
4.2. IFRS16 is an accounting standard that councils have to implement in 2024/2025.  The
consequence is that there are changes in how the Council accounts for leases in its
Annual Accounts.  This standard also applies to how we account for the Council’s PPP. 
By applying this standard, there is a reduction in what is charged to the Revenue
Budget over the medium term, allowing further savings to be made. 
4.3. Officers from Finance Services have been working with the Council’s Treasury
Management advisers to quantify the impact of this change in accounting treatment.   
4.4. Based on the work done to date, estimated savings of £1.600 million have been
identified across the 3 years of the Budget Strategy from 2025/2026 to 2027/2028. 
This work will continue to be developed. 
4.5. Savings:  It is proposed that the budget reductions of £1.600 million, which are the
result of a change to accounting guidance, are used to help address the Council’s
Budget Gap across the years 2025/2026 to 2027/2028.  There are also additional
savings available in 2028/2029 (£1.3 million) and 2029/2030 (£1.7 million).  The profile
of the savings across the coming years is shown in Table 2 within Annex B. 
5. Loans Fund Review – In-Year Underspends 
5.1. As the proposal is to take the Loans Fund Review savings across the 3 years of the
Medium-Term Budget Strategy (2025/2026 to 2027/2028), there will also be in-year
underspends that could be used to further support the Budget Strategy itself.  Table 5
within Annex B shows the in-year underspend resulting from the review and removes
the proposed savings from the review (sections 3.2 and 4.5).  This leaves a resultant
underspend each year. 
5.2. In addition, work on the review and on the loan charges projection for the current year
has identified an in-year underspend of £7.246 million in 2024/2025.  This is the result
of a reduction in repayments of external debt due to the timing of the original Loans
Fund Review being implemented, and also reflects reduced costs as a result of the
timing of borrowing required for various projects within the Capital Programme. 
5.3. The total underspend available across the 4 years (2024/2025 to 2027/2028) is
£26.495 million.  There is the option to use these underspends to support the Budget
Gap, on a one-off basis across the years, being mindful of the fact that the use of
187

Page 188

41 
these underspends needs to be reinstated into the next year.  These underspends
are illustrated in Table 5 within Annex B and total £26.495 million across the years
2024/2025 to 2027/2028. 
5.4. Table 6 within Annex B shows how we can use £13.000 million of the loan charges
underspends to assist in managing the Budget Gap across the 3 years of the Budget
Strategy.  This reduces the Medium-Term Budget Gap to £48.075 million. 
5.5. Assumptions have been made on the base Budget Gap for 2028/2029 to 2030/2031 for
illustration purposes. Table 7 in Annex B shows the impact of reinstating the use of
£13.000 million of the underspend in the medium term, and how that can be managed in
the next years, until 2030/2031, by using the remainder of the loan charges underspend
(£13.495 million).  Table 7 shows that the Budget Gap remains the same before and
after the use of the loan charges underspends.  The benefit of these underspends is to
smooth the savings requirement across years. 
6. 2028/2029 and Beyond
6.1.   As outlined in Section 3.4, reinstatement of the budget of £1.500 million is required in
2028/2029 and 2029/2030 from the Loans Fund Review / Additional Voluntary
Payments. 
6.2. It is proposed that this is offset by the additional savings of £3.000 million available in
2028/2029 and 2029/2030 from the accounting treatment of Service Concessions
(IFRS16) (section 4.5). 
6.3. This takes the total benefit over the five-year period to £17.700 million.  This is
illustrated in Annex B, Table 3. 
7. Financial Implications
7.1. The financial implications of the Loans Fund review have been identified in Sections 2
to 6 and summarised below: 
• Savings of £14.600 million from the loans fund review are proposed across the 3-
year period of the Budget Strategy (2025/2026 to 2027/2028) (Section 3.2).  This
reduced the Budget Gap in 2025/2026 by £5.500 million. 
• The work on Service Concessions is detailed in Section 7 and the financial impact
has identified savings of £1.600 million across the period 2025/2026 to 2027/2028
(Section 4.5).  This reduces the Budget Gap in 2025/2026 by £1.100 million. 
• Additional in-year underspends from the Loans Fund Review total £26.495 million
(detailed in section 5). There is the option to use the in-year underspends from the
Loans Fund Review to help address the Budget Gap, on a one-off basis across
the years, being mindful of the fact that the use of these underspends needs to be
reinstated into the next year.  It is proposed that £13.000 million is used to help
address the Budget Gap in 2027/2028.  This needs to be restated in 2028/2029. 
7.2. The overall implications of the proposals on the current Budget Gap for the years
2025/2026 to 2027/2028 are summarised in Table 1.   
188

Page 189

42 
Table 1 – Impact on the Budget Gap 2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Original Budget Gap 
2025/2026 to 2027/2028
(June 2024, Executive Committee)
22.355 24.515 30.405 77.275
Less
Council Tax and Utilities 
(Table 1 / Section 4.8) 
5.900  -  -  -
Revised Budget Gap 16.455 24.515 30.405 71.375     
Less:  Loans Fund and Service
Concessions Savings 
(Annex B, Table 4)
(6.600) (6.000) (3.600) (16.200)     
Use of One-off Underspends - - (13.000) (13.000) 
7.3. Table 1 shows that following the review, the Loans Fund and Service Concession
savings could help address the Revised Budget Gap across the 3 years of the Medium-
Term Budget Strategy and the Budget Gap over these 3 years could be reduced to
smooth the requirement for savings.  The majority of this saving is generated by the
Loans Fund Review and the removal of the voluntary repayments – this option is only
available from 2025/2026 onwards due to the fact that the Additional Voluntary
repayments were originally programmed to start in 2025/2026.  This proposal would
not any impact on service delivery. 
7.4.   Beyond the period of the Medium-Term Strategy, Table 2 shows how the remainder
of the £26.495 million of the underspends could be used to manage the Budget Gap
in the medium term highlighting that the estimated total Budget Gap is the same before
and after the use of the loan charges underspends.    
Table 2 – Beyond 2027/2028  2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
2030 /
2031
£m
Revised Budget Gap (Table 1)
(later years for Illustration) 
30.405  10.000 10.000 10.000
Less 
Loans Fund Review / Service
Concessions (IFRS16)
(3.600)  (0.300) (1.200) -
Budget Gap after Loans Fund
and Service Concessions 
26.805  9.700 8.800 10.000
Use of Underspends (13.000)  (9.000) (4.495) 0.000
Reinstatement of Underspends -  13.000 9.000 4.495
Budget Gap after Use of
Underspends
13.805  13.700 13.305 14.495 
7.5. Table 2 shows how we can use the underspends to help address the Budget Gaps in
the years beyond the Medium-Term Strategy, and again, smooth the requirement for
savings.  
189

Page 190

43 
7.6. Net additional savings in 2028/2029 and 2029/2030 from both the Loans Fund Review
and Service Concessions of £1.500 million, bring the total benefit over the five-year
period to £17.700 million (Section 6).  Section 6 notes that reinstatement of the loan
charges budget will be required, however, this can be managed by additional savings
from Service Concessions.   
190

Page 191

44 
Annex A 
Loan Charge Projections Across Years 
(Over)/Under
Spend
(inc. Additional
Interest) 
(a) 
£m
Saving/
(Negative Budget
Impact) 
(b) 
£m 
Additional
Interest 
(included in
column a) 
(c) 
£m
2025/2026 18.849 18.849  0.234
2026/2027 17.017 (1.832)  0.723
2027/2028 14.583 (2.434)  1.244
2028/2029 13.594 (0.989)  1.805
2029/2030 13.046 (0.548)  2.376
2030/2031 11.927 (1.119)  2.939
2031/2032 10.592 (1.335)  3.483
2032/2033 8.977 (1.615)  4.021
Interest from 2033/2034 to 2061/2062 168.812
Total Interest 185.637 
191

Page 192

45 
Annex B
Table 1:  Loans Fund Review – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Cumulative Savings 5.500 11.000 14.600  13.600 13.100 
Table 2:  Service Concessions – Proposed Savings 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Service Concessions 1.100 0.500 -  1.300 1.700
Cumulative Savings 1.100 1.600 1.600  2.900 4.600 
Table 3 – Total Savings from Review (Loans Fund and Service Concessions) 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
Loans Fund Review 5.500 5.500 3.600  (1.000) (0.500)
Service Concessions 1.100 0.500 -  1.300 1.700
Total Savings 6.600 6.000 3.600  0.300 1.200
Cumulative 6.600 12.600 16.200  16.500 17.700 
Table 4 – Impact of the Review Savings on the Budget Gap 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Original Budget Gap 
2025/2026 to 2027/2028
(June 2024, Executive Committee)
22.355 24.515 30.405 77.275
Less
Total Loans Fund and Service
Concessions Savings (from Table 3)
(6.600) (6.000) (3.600) (16.200)
Resultant Budget Gap
(after Loans Fund and Service
Concessions Savings)
15.755 18.515 26.805 61.075 
192

Page 193

46 
Annex B (contd)
Table 5:  Loans Fund Review – In-Year Underspends 
2024 /
2025
£m
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
In-Year Underspend from Loans
Fund Review (Annex A, Column a)
7.246 18.849 17.017 14.583
Less: Loans Fund Review Savings for
Budget Strategy (Table 1)
- 5.500 11.000 14.600
Resultant In Year Underspend 7.246 13.249 6.017 (0.017)
Cumulative Underspend 7.246 20.495 26.512 26.495 
Table 6 – Use of Underspends to Support the Budget Gap 2025/2026 to 2027/2028 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Total 
£m
Resultant Budget Gap 
(Table 4)
15.755 18.515 26.805 61.075
Use of Underspends -  (13.000) (13.000) 
15.755 18.515 13.805 48.075 
Table 7 – Use of Underspends to Support the Budget Gap Beyond 2027/2028 
Table 2 – Beyond 2027/2028  2027 /
2028
£m 
2028 /
2029
£m
2029 /
2030
£m
2030 /
2031
£m
Original Budget Gap (June 2024)
(For Illustration) 
30.405  10.000 10.000 10.000
Loans Fund Review / Service
Concessions
(3.600)  (0.300) (1.200) -
Revised Budget Gap 26.805  9.700 8.800 10.000
Use of Underspends (13.000)  (9.000) (4.495) 0.000
Reinstatement of Underspends -  13.000 9.000 4.495 
13.805  13.700 13.305 14.495 
193

Page 194

47 
Appendix 5 
Areas of Risk 
• Pay Awards:  The Strategy includes an assumption for both teaching and non-teaching
staff in 2025/2026 and beyond as well as the full year effect of an estimated Teachers’
Pay Award from August 2024 (into 2025/2026). The pay deal for Non-Teachers is set for
2024/2025 only and there has been no agreement of what the pay award will be beyond
financial year 2024/2025.  For teaching staff, there is no pay deal beyond August 2025. 
This is therefore a risk to the financial Strategy.   
• Children and Families: The position on the approved recovery plan to mitigate the
estimated £10.6 million of pressures associated mainly with external placements have
been reported to the Social Work Committee during 2024/2025.  This includes the
commissioning of new Intensive Family Support Services to address high-cost residential
placements, ongoing reviews of policies and procedures, service reviews and a review
and update of contracts.  This is a multi-year recovery plan, and any slippage is a risk to
the Council’s budget.     
• Utilities:  As noted in section 4.4, there is a downward trend in the price for utilities,
specifically.  Account has been taken of the impact into 2025/2026 for the known price of
units for 2024/2025, and a further reduction is anticipated into 2025/2026 based on what
has been purchased so far.  However, due to the relatively small amount purchased for
the years 2025/2026 and 2026/2027 this will continue to be monitored as further
purchases are made during the year.   
• Insurance:  The Council operates an Insurance Fund to manage claims and liabilities
arising from normal business.  An amount has been included in the Budget Strategy to
enable the Fund to balance on an annual basis without the need for a Fund.  However,
there is a risk that this additional budget may be insufficient if the level of claims
experienced increases.   
194

Page 195

i 
Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Glasgow City Region City Deal – Stewartfield Way
Capacity Enhancement Project: Outline Business Case 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 set out the Outline Business Case for the Stewartfield Way Capacity
Enhancement project
 advise the Committee on the next steps in developing and delivering the project
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Outline Business Case for the Stewartfield Way Capacity
Enhancement project be approved;
(2) that the proposed next steps in developing the project be approved;
(3) that grant funding be sought in accordance with the City Deal Grant
Distribution Process outlined in the Assurance Framework in relation to
preliminary costs; and
(4) that the relevant Full Business Cases for the project and associated sub-
projects be developed for future presentation to the Executive Committee and
City Region Cabinet.
[1r
3. Background
3.1.   The Council is one of eight local authorities who, with the UK Government and the
Scottish Government, are signatories to the £1.13 billion Glasgow City Region City
Deal signed on 20 August 2014.  
3.2.   The City Deal initiative comprises an initial list of 20 key projects which are 
intended to collectively drive economic growth across the City Region.  
3.3.   The proposed Stewartfield Way Capacity Enhancement project is one of South
Lanarkshire Council’s (SLCs) City Deal funded projects, the others being Cathkin
Relief Road (complete), Greenhills Road (complete), the four Community Growth
Areas at Newton, East Kilbride, Hamilton and Larkhall (in progress) and the East
Kilbride Town Centre project (in development). 
3.4.  Governance arrangements for the City Deal initiative are defined within the
associated Assurance Framework. This sets out requirements for the development
of Business Cases for individual projects. The first level of business case, the
Strategic Business Case, was approved for the three SLC Roads projects and the
four SLC Community Growth Areas by the Executive Committee on 26 August 2015.
9
195

Page 196

ii 
3.5.   An augmented Strategic Business Case for the original project was approved by the
Executive Committee on 10 March 2021 to reflect design development of the
scheme and an adjustment to the scope of the works. 
3.6.  The Outline Business Case for each project requires to be formally approved via
the:-
 Member Authority Council 
 City Region Chief Executives’ Group 
 City Region Cabinet 
4. Current Position 
4.1.  To date this project has focused on the transportation challenges across the town
and how improvements to the road and wider sustainable transport network could
accelerate and unlock development potential, improve access to existing facilities
and improve journey times. While these issues remain at the heart of the proposals,
a refined approach bringing together a combination of transportation improvements
and direct town centre interventions is now considered the best way to bring
sustainable economic growth to the town. 
4.2. The East Kilbride Town Centre Masterplan was approved by the Executive
Committee on 13 September 2023 and sets the strategic direction of the town centre
for the next 20 years.  Thereafter, on 8 May 2024, the Executive Committee
approved development of the East Kilbride Town Centre project and the rescoping of
the original Stewartfield Way Capacity Enhancement project to include the Town
Centre.  This led to the realignment of the approved project budget of £62.2 million,
with £32.2m now allocated towards the town centre and £30 million remaining for the
Stewartfield Way Capacity Enhancement project. 
4.3. The Stewartfield Way Capacity Enhancement project and the East Kilbride Town
Centre project are now progressing at slightly different rates, influenced by market
conditions and developer engagement. The Stewartfield Way Capacity
Enhancement project has progressed to the stage that an Outline Business Case
can now be produced building on the augmented Strategic Business Case in terms
of:-  
 Strategic Case 
 Economic Case 
 Commercial Case 
 Financial Case 
 Management Case 
4.4. The Executive Summary of the Stewartfield Way Capacity Enhancement project
Outline Business Case is set out in Appendix 1. 
4.5. The project is expected to deliver: 
 1.8km of enhanced road network - The widening of the existing carriageways
on the A749 and Stewartfield Way to enhance and facilitate the new junction
layouts. The carriageway alignment will be designed to the Design Manual for
Roads and Bridges (DMRB)
 1.0km of New Shared Cycle Route - The improvement and addition to the
existing off-road cycleway adjacent to the carriageway. The cycle way will
extend and tie into existing cycle routes in the area
196

Page 197

iii 
 5 Improved Junctions - Junctions at the existing Mavor and Nerston
roundabouts to be re-designed to new 3 / 4 way traffic signal controlled
junctions with cycle and pedestrian facilities and a new traffic signal-controlled
junction to be constructed at the existing entrance to PlaySport
 1 New Junction - a new traffic signal-controlled junction to be constructed,
which creates a new route into the Kingsgate retail area, with pedestrian and
cycle facilities 
4.6.  The production of the Outline Business Case is another key milestone and provides
the basis for further development of the project. The approval of this Outline Business
Case by the City Region Cabinet on 5 November 2024 will be conditional on the
Executive Committee approval being given today.  
4.7.  It is intended that this culminates in the development and completion of a Full
Business Case from 2025/2026, following completion of statutory processes and
project tendering arrangements. 
5. Delivery Timeline 
5.1.  The Outline Business Case sets out an indicative timescale of when the project will
progress through each delivery stage as follows: 
 Design: ongoing to October 2025
 Ground Investigation: ongoing to July 2025
 Land agreements / Planning Consultation / Consents etc: ongoing to July 2026
 Tender preparation / Procurement Process / Contract Award: October 2025 to
July 2026
 FBC Submission and Approval: by June 2026
 Construction:  October 2026 to October 2028
 Project Maintenance: October 2028 onwards 
6.   Employee Implications 
6.1.   There are no direct employee implications from this project as existing resources
within Community and Enterprise Resources are currently tasked with the design,
management, delivery, monitoring and evaluation of this City Deal project. 
7.   Financial Implications 
7.1.  The total cost of the City Deal Stewartfield Way Capacity Enhancement project is
expected to be £30 million. Over the lifetime of this project, grant totalling £25.8
million (86%) is expected from City Deal with the balance of funding, £4.2 million
(14%) being met by the Council.  
7.2.   A full and robust monitoring process will be put in place following approval of the
project / associated sub projects by the City Region Cabinet. 
7.3.   The City Deal Assurance Framework allows grant to be awarded at each Business
Case stage (Strategic, Outline and Full) to meet the costs incurred by the Council
leading up to the approval of the Full Business Case(s) and the formal award of
contracts associated with capital expenditure. Approval to incur additional
expenditure of up to £3.5 million is included in the Outline Business Case.
197

Page 198

iv 
8. Other Implications 
8.1.  The City Deal Cabinet has a Risk and Issues Management Strategy to be applied
across all City Deal projects. The purpose of this Strategy is to provide a systematic
and effective method by which risks can be consistently managed. It adopts a best
practice approach, describes the specific risk management techniques and standards
to be applied and the responsibilities for achieving effective risk management. The
Council is required to apply this strategy across each of its City Deal projects to
ensure consistency across all City Deal projects. This will be a key tool in mitigating
project risks and thereby limiting our financial risk associated with our share of City
Deal project costs.  
8.2.  The processes associated with the approval of the Stewartfield Way Capacity
Enhancement project have considered the following sustainability agenda items and
are subject to monitoring and review as detailed proposals for each phase of the
development progress:-  
 choice of materials and the use of low and zero carbon generating technologies 
 support sustainable water resource management 
 support sustainable waste management 
 Consideration of the lifecycle costs and impacts of the development 
 encourage the use of sustainable and recycled materials in construction 
 support habitat connectivity 
 consider active travel and sustainable transport links 
9. Integrated Impact Assessment and Consultation Requirements
9.1.  Consultation has taken place with relevant Resources within the Council, the City
Region Programme Management Office and local stakeholders. This is set out within
the relevant business cases. Further consultation will take place as part of the
statutory approvals process and as the project progresses to the delivery stage. 
9.2.  The report does not presently introduce a new policy, function or strategy or
recommend a significant change to an existing policy, function or strategy, and,
therefore, no integrated impact assessment is required. However, as the project
develops and progresses to delivery stage an Integrated Impact Assessment will be
undertaken in line with Council policy. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 October 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Accountable, effective, efficient and transparent 
Priorities
 We will work towards a sustainable future in sustainable places 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
198

Page 199

v 
Previous References
 Executive Committee, 26 August 2015
 Executive Committee, 10 March 2021
 Community & Enterprise Resources Committee, 23 April 2024
 Executive Committee, 8 May 2024 
List of Background Papers 
 Stewartfield Way Capacity Enhancement Project Outline Business Case 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Ross, Economic Development Manager
E-mail: iain.ross@southlanarkshire.gov.uk 
199

Page 200

vi 
Appendix 1 - Executive Summary
1.1 Introduction
This Outline Business Case (OBC) is requesting capital funding of £30m including £25.8m from the City Deal and £4.2m
from SLC to support the Stewartfield Way Capacity Enhancement Project (SFWCEP).  The gearing ratio between City
Deal and SLC funding is split: City deal 86% and SLC 14%. 
This OBC continues to build the case outlined in the SBC which released £1m to develop the project proposal from SBC
to OBC.  This OBC seeks an additional £3.5m to be released to develop the project proposal (this includes Public Utilities
Diversions, Land Agreements, ground investigations, environmental reports and design) to FBC. 
The project involves a targeted intervention in the transport network, increasing the capacity of Stewartfield Way by
alleviating congestion at critical pinch points, road dualling at strategic section of SFW and the creation of adjacent
cycling and improved bus infrastructure.  This is predicted to accelerate the delivery of new development.
1.1.1 Project Scope 
Direct City Deal Funded Activity:
The key component of the proposed scheme is the conversion of the existing roundabouts at Nerston and Mavor
junctions to 3 and 4 way traffic signal controlled junctions.  This will enhance the flow of traffic through the junctions,
removing “choke points” and support and accelerate economic development in the north and west of East Kilbride. 
The improvement will benefit residents and businesses in East Kilbride as well as residents of Rutherglen, Cambuslang,
Hamilton and Glasgow at large, in addition to residents travelling to and from outlying areas such as Chapelton and
Strathaven. 
As part of the Stewartfield Way project, active travel improvements will be delivered including walking and cycling
infrastructure.  This will provide connections to both the NCN-756 national cycle route and the local cycle network.  This
will include the widening of parts of the NCN-756 and improvements to the facilities at Mavor and Nerston junctions,
along with improvements to the adjoining local cycle network.
The specification includes:
• 1.8km of Road Enhanced - The widening of the existing carriageways on the A749 and Stewartfield Way to
enhance and facilitate the new junction layouts. The carriageway alignment will be designed to the Design
Manual for Roads and Bridges (DMRB).
• 1km of New Shared Cycle Route - The improvement and addition to the existing off-road cycleway adjacent to
the carriageway. The cycle way will extend and tie into existing cycle routes in the area.
• Drainage elements will be designed to the DMRB and the Sewers for Scotland guidelines.
• New modern LED street lighting (50 columns) incorporating aluminium columns with LED lanterns will be
implemented. The lighting project will be designed to BS EN 13201 lighting class ME4a.
• 5 Improved Junctions - Junctions at the existing Mavor and Nerston roundabouts to be re-designed to new 3 /
4 way traffic signal controlled junctions with cycle and pedestrian facilities and a new traffic signal-controlled
junction to be constructed at the existing entrance to PlaySport.
• 1 New Junction - A new traffic signal-controlled junction to be constructed, which creates a new route into the
Kingsgate retail area, with pedestrian and cycle facilities.
200

Page 201

vii 
Figure 1 – Location Plan 
Follow-on Activity: 
The City Deal investment is expected to bring forward additional active travel routes in line with the East Kilbride Active
Travel Plan as funding becomes available from Transport Scotland. 
In addition, it is anticipated that the project will help leverage and accelerate investment from the private sector
(£69.4m), including commercial and residential development across vacant greenfield and brownfield sites -24,380 sqm
mixed office and industrial (class 4, 5, 6).
1.2 Strategic Case 
Stewartfield Way is on northern edge of the town and is the most direct route for traffic travelling to, from and
between two major transport nodes in East Kilbride – the Glasgow Southern Orbital in the west (M77 connection) and
the A749 East Kilbride Expressway in the east (M74 connection). It is, however, a single carriageway one-lane road with
eight roundabouts between these two points and, as such, through traffic typically uses the A726 Queensway dual
carriageway through the town centre, or other less appropriate routes. 
Project delivery is part of the wider East Kilbride Community Growth Area and will provide the opportunity for opening
up potential development sites identified in the Local Development Plan and improve access to existing businesses. 
SLC have identified several Brownfield sites in proximity to SFW that are allocated in the LDP 2 but are currently stalled.
These sites could be opened up through the provision of an enhanced transport network and accelerate development
activity to help create new employment generating opportunities. 
The key challenges that the SFWCEP is seeking to address are:
• Economic constraints – decline in employment opportunities.
• Lack of commercial floorspace – retention and attraction of businesses.
• Population constraints – long-term growth putting pressure on transport.
• Sustainability constraints – long-term attractiveness of East Kilbride.
• Capacity constraints – road network restricts brownfield and new site development opportunities.
• Sustainable travel constraints – infrastructure restricts modal shift to sustainable/ active travel. 
1.2.1 Policy Fit
UK Level 
• Growth Plan 2022.
201

Page 202

viii 
Scotland Level
• National Performance Framework.
• Scotland’ National Strategy for Economic Transformation.
• National Planning Framework 4.
• National Transport Strategy 2.
• Infrastructure Investment Plan for Scotland 2021-22 to 2025-26.
• Equality, opportunity, community – New leadership – A fresh start.
Glasgow City Region and Local Policy
• Glasgow City Region Deal. 
• Glasgow City Region Economic Strategy.
• Clydeplan.
• Connect – Council Plan 2022-2027.
• South Lanarkshire Local Development Plan 2
• South Lanarkshire Local Transport Strategy 2013-2023
202

Page 203

ix 
SMART Objectives
Objective Specific Measurable Attainable Relevant Time-bound
Support the
development of
brownfield sites in East
Kilbride.
Leverage private sector investment
of £69.4m in identified brownfield
sites and deliver 24,000 sqm of
commercial space and 150 housing
units
Measurable by property
development activity –
building warrants and
completion certificates 
To be delivered by private developers
and dependent on City Deal funding for
enabling infrastructure
Based on identified sites and
aligned with policy objectives
Private sector property
developed expected to be
realised by 2044 
Improve access to
employment and
training opportunities.
Create 150 direct construction jobs
and £8.6m GVA, and through
leveraged activity support a further
530 indirect jobs and £182m GVA
and number of apprenticeships, job
training opportunities created
Measurable by construction
contractors benefits
reporting and post-
implementation monitoring
plans 
SLC have control over project deliver and
can influence direct project impacts- jobs,
GVA and training opportunities. Indirect
impacts are subject to private sector
follow-on activity.  
Based on a project level data and a
bespoke economic impact
appraisal.
Direct impacts to be
achieved by 2028, follow-
on impacts expected to
be achieved by 2044. 
Improve the resilience
of the local transport
network.
Delivery of a reliable local road
network that supports efficient
journey times and enhanced
reliability for route users,
particularly public transport
operators through delivery of:
• 1 new and 5 enhanced
junctions.
• 1.8 km of road enhancements 
• 50 new lighting columns
• 7 pedestrian crossings
installed
Measurable by monitoring
journey times pre and post
project completion
Based on traffic modelling in East Kilbride
and transportation appraisal of the
project.
Need is based on data from traffic
modelling; aligned with policy
objectives
Benefits accrue following
the completion of the
project 2028.
Increase sustainable
travel mode share.
Delivery of walking/ cycling options
with access to major bus and rail
stations
• 1 km of new pathways/cycle
paths 
Measurable by monitoring
travel patterns and
passenger volumes
Based on traffic modelling in East Kilbride
and evidence of behavioural change in
similar locations
Aligned with policy objectives Benefits accrue following
the completion of the
project 2028.
203

Page 204

10 
1.3 Economic Case 
1.3.1 Shortlisted Options
Short-Listed Options
Option Description
Option 1: Do nothing The business-as-usual or counterfactual position considers what would happen in the absence
of public sector intervention
Option 2: Do minimum Integrated bus route and stop enhancement, including controlled pedestrian crossings.
Option 3:  Dualling partial length +
(Preferred way forward)
Dualling partial length at key locations, junction and controlled crossing enhancements, and
active travel options.
Option 4: Full dualling along length of
SFW
Full dualling along length of SFW, junction and controlled crossing enhancements and active
travel options.
1.3.2 Benefits 
Over the 25-year appraisal period, the total present value net GVA impacts are outlined below.
Cumulative 25-Year Impacts (Net GVA) 
Option 1 Do
Nothing
Option 2 Do
minimum
Option 3 Dualling
partial length +
(Preferred way
forward)
Option 4 Full
dualling along
length of SFW
South Lanarkshire £41.5 £91.8 £168.7 £190.8
Glasgow City Region £62.7 £140.2 £256.1 £290.0
Scotland £55.0 £124.3 £226.7 £256.9
1.3.3 Value for Money 
The public sector cost benefit ratio which sets Present Value Net Additional GVA impacts against present value public
sector costs are presented below. 
Public Cost Benefit Ratios
Benefit
Ratios 
Total Present Value
Costs Present Value Net GVA BCR
Option 2
South Lanarkshire £17.7 £50.2 2.8
Glasgow City Region £17.7 £77.5 4.4
Scotland £17.7 £69.3 3.9
Option 3
South Lanarkshire £26.9 £127.2 4.7
Glasgow City Region £26.9 £193.4 7.2
Scotland £26.9 £171.8 6.4
Option 4
South Lanarkshire £36.6 £149.3 4.1
Glasgow City Region £36.6 £227.3 6.2
Scotland £36.6 £201.9 5.5
Values rounded to nearest £0.1m and discounted at 3.5% annually. 
204

Page 205

11 
The summary benefits set against City Deal Key Economic Performance Indicators are presented.
City Deal Key Economic Performance Indicators
Output
Category Output Reference Benefit Geographic
Level
Value
By 2035
Value
Over 25
Years
Employment
EMP_01 Gross Construction PYE by 2035 Glasgow City
Region 330 -
EMP_02 Net Additional Construction PYE by
2035
Glasgow City
Region 290 -
EMP_03 Gross Operational FTEs by 2035 Glasgow City
Region 400 -
EMP_04 Net Additional Operational FTEs by
2035
Glasgow City
Region 270 -
GVA
GVA_GCR_01 Net Additional GVA by 2035 (£m) Glasgow City
Region £60.3  
GVA_GCR_02 Net Additional GVA over 25 year
period (£m)
Glasgow City
Region   £191.5
GVA_SCOT_01 Net Additional GVA by 2035 (£m) Scotland £54.4  
GVA_SCOT_02 Net Additional GVA over 25 year
period (£m) Scotland   £169.9
Investment
OFL_01 Direct Project Private Sector
Investment by 2035 (£m)
Glasgow City
Region £0.0 -
OFL_02 Net Additional Private Sector
Investment (Follow-on) by 2035 (£)
Glasgow City
Region £18.7 -
OFL_03 Total Investment Combined (£m) Glasgow City
Region £18.7 -
OFL_04 Other Public Sector Investment
Leveraged
Glasgow City
Region £0.0 -
BCR
BCR_01 Value of Net Additional Benefits over
25 Years (£m)
Glasgow City
Region - £193.4
BCR_02 Value of Public Sector Costs over 25
Years (£m)
Glasgow City
Region - £26.9
BCR_03 Public Benefit Cost Ratio over 25
Years
Glasgow City
Region - 7.2
1.4 Commercial Case 
1.4.1 Addressing Partners’ Needs  
The project has been informed by a traffic modelling exercise that looked at issues and challenges across the wider East
Kilbride road and active travel network and the development of the preferred option took account of factors including
risk, impact, cost, value for money, and also specifically considered whether the preferred solution addressed the
identified market failure and the needs of project partners. 
1.4.2 Delivering Follow-on-Investment
Achieving success over the longer term is dependent on securing follow-on investment from the private sector within a
range of sites within proximity to the road network and within the wider town centre. As per the Economic Case, some
of this investment is unlikely to occur in the absence of the project, while within other sites its likely to be accelerated
(i.e. it would likely happen but as a result of the project will occur over a condensed timescale). 
The potential development sites are noted below. Assuming a commercial development footprint of 25%, this could
leverage c. 24,000sqm of commercial floorspace. If we specifically consider the sites in close proximity to SFW (1-3km),
this equates to 16,650 sqm.  The timescales over which the leveraged activity and investment is anticipated is 2028 –
2037. 
205

Page 206

12 
The need for follow-on investment and development activity is identified as a key external dependency of the project. It
should be noted that in the absence of the project, there will be no follow-on investment 
No other alternative funders or sources have been identified – the project will, however, leverage additional funding
from Transport Scotland as funding becomes available to provide a continuous active travel route. 
1.4.3 Procurement Strategy
All procurement will comply with SLCs Procurement Strategy (2023-28) and will also follow the Scottish Government’s
Procurement Journey as best practice for public sector procurement as well as the Glasgow City Region Sustainable
Procurement Strategy.
Tendering for Required Services 
Timescales for the delivery of key elements of the project are outlined below, with completion of the main construction
scheduled for 2028. 
 Design: ongoing to October 2025
 Ground Investigation: ongoing to July 2025
 Land agreements / Planning Consultation / Consents etc: ongoing to July 2026
 Tender preparation / Procurement Process / Contract Award: October 2025 to July 2026
 FBC Submission and Approval: by June 2026
 Construction:  October 2026 to October 2028
 Project Maintenance: October 2028 onwards 
The conditions of contract chosen are the NEC4 Engineering and Construction Contract, Option C (Target Contract with
activity schedule). The Council have successfully used this contract, along with others from the NEC suite, for almost 15
years. These conditions offer a managed approach to the contract process and have allowed South Lanarkshire Council
to maintain control of both time and budget throughout the duration of the project.
1.5 Financial Case 
The total public sector capital costs to deliver the project are £30m, broken down as follows: 
• City Deal: £25.8m.
• SLC City Deal Match: £4.2m. 
The gearing ratio achieved between City Deal and the Managing Authority is City Deal 86% and SLC 14%.  The project
period is estimated to be between 2024 – 2032 with the main construction activity occurring 2026 – 2028. 
This OBC continues to build the case outlined in the SBC which released £1m to develop the project proposal from SBC
to OBC.  This OBC seeks an additional £3.5m to be released to develop the project proposal (this includes Public Utilities
Diversions, Land Agreements, ground investigations, environmental reports and design) to FBC. 
Breakdown of Project Costs
Budget heading  Cost estimate 
Site investigation £150,000 
Land / Legal fees £100,000 
Accommodation works £500,000 
External consultants £489,000 
Design fees £1,141,000 
Site supervision fees £1,630,000 
Public utilities £2,500,000 
Contract works £16,300,000 
Traffic signals £300,000 
Public consultation costs £5,000 
Post contract monitoring £163,000 
206

Page 207

13 
Monitoring and evaluation £163,000 
Optimism Bias £3,260,000 
Contingencies £3,260,000 
Total £29,961,000 
Financial risks are fully considered in Risk Register along with an assessment of how they will be allocated and
managed.   
1.5.1 Project Costs
Phasing of Project Costs
2024 2025 2026 2027 2028 2029 2030 2031 2032 Total
£85,000 £2,845,000 £2,270,000 £13,000,000 £11,000,000 £200,000 £200,000 £200,000 £200,000 £30,000,000
0.3% 9.5% 7.6% 43.3% 36.7% 0.7% 0.7% 0.7% 0.7% 100%
Note: figures rounded 
The total amount of leveraged private funding and estimated profile is outlined below. 
Estimated Follow-on Investment 
2029 2030 2031 2032 2033 2034 2035 2036 2037 Total
Commercial  £5.3 £7.4 £3.9 £4.2 £5.6 £5.9 £2.0 £3.9 £3.3 £41.6
Housing  £11.8 £11.8 £4.1 £0.0 £0.0 £0.0 £0.0 £0.0 £0.0 £27.8
Total  £17.2 £19.3 £8.0 £4.2 £5.6 £5.9 £2.0 £3.9 £3.3 £69.3
1.6 Management Case 
1.6.1 Project Roles and Responsibilities
The project will be delivered through SLC Roads, Transportation and Fleet Services. The Council’s Legal and
Procurement service will ensure that all the contractor/subcontractors and consultant/sub-consultants engaged on the
planning, design and delivery of the project comply with statutory requirements.
Internal Project Governance Organogram 
207

Page 208

14 
1.6.2 Monitoring and Benefits Realisation
SLC is developing a City Deal monitoring and evaluation framework to ensure compliance with PMO requirements for
performance management. 
Quarterly progress reporting on project development and delivery is provided by the City Deal Programme Manager
(Economy & Infrastructure) to the Programme Management Office via project status reports and MA programme
reports. Benefit realisation updates will also be provided on a quarterly basis to adhere with the requirements of GCR
City Deal, using the methodology set out in the Benefit Tracking Template provided within the Assurance Framework. 
Project monitoring and evaluation is a key element of the appraisal process. The project will be subject to a robust
monitoring and evaluation programme, in line with the guidance set out in the CD Assurance Framework and Green
Book and led by the CD team set up by SLC.   
208

Page 209

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Housing and Technical Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Transformation Fund – Phase 1 Update and Phase 2
Proposals 
1. Purpose of Report
1.1. The purpose of the report is to: - 
 advise of the progress of investment in properties identified in Phase 1 of the
Transformation Fund Programme
 seek approval for Phase 2 of investment proposals 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the progress in relation to Phase 1 of investment from the Transformation
Fund, as detailed in Appendix 1, be noted;
(2) that the proposals for Phase 2, as set out in Section 5 and Appendix 2, be
approved;
(3) that the arrangements for monitoring the programme and budget, as set out in
Section 6, be approved;
(4) that delegated authority be granted to the Executive Director (Housing and
Technical Resources), Executive Director (Community and Enterprise
Resources and Executive Director (Finance and Corporate Resources) to
amend budget allocation for each project and/or amend project scope as
required when final costs are known, ensuring the overall budget is not
exceeded; and
(5) that, should there be any available budget following the delivery of all agreed
projects within Phase 1 and 2, delegated authority be granted to the Executive
Director (Housing and Technical Resources) and Executive Director
(Community and Enterprise Resources) to progress with further priority projects
as identified at Section 6.2.  
3. Background
3.1. In recognition of the service delivery and community challenges arising from the
property estate managed by South Lanarkshire Leisure and Culture (SLLC), the
Council at its meeting held on 22 February 2023, approved funding for capital
investment to help modernise the leisure and culture estate, optimise use of assets
and assist in the transition towards net zero. 
10
209

Page 210

3.2. A fund of £13million has been included in the Council’s financial plans in the capital
programme and this is what has become known as the Transformation Fund. 
3.3. At its meeting on 8 May 2024, the Executive Committee approved Phase 1 of
investment priorities with an estimated budget allocation of £8.4 million. 
4 Phase 1 Update 
4.1. Property Services have worked alongside Community and Enterprise Resources,
Finance Services and SLLC to develop detailed specifications for each of the projects
and Appendix 1 sets out the current position with regards to delivery and current
project status. 
4.2. Now that detailed specifications and tender exercises are progressing, there is a
clearer understanding of the likely costs which is now estimated to be £8.825 million
including the addition of a 5% contingency allowance. There remains a number of
projects at design or procurement stage therefore, we await full market testing of
estimated costs before the final financial position will be known. It should be noted that
the current projected forecast spend for financial year 2024/2025 is £3.5 million. 
4.3. A full update on Phase 1 projects is detailed in Appendix 1 of this report with the latest
estimated spend against each project identified. As many projects currently remain as
estimated costs at this stage, it should be noted that individual projects may change
in value, however the programme will be managed within the overall funding pot. 
5. Phase 2
5.1. Committee will recall that taking into account the objectives of the Transformation
Fund, projects are assessed on the basis that they must relate to a property
managed by SLLC and fall under one of the following headings:- 
1. Adaptation and modernisation
2. Energy Efficiency and Decarbonisation
3. Reduction in Liabilities and Demolition
4. Community Accessibility 
5.2. In parallel to progressing Phase 1, consideration has been given to Phase 2 projects
based on the above criteria. 
5.3. It should be noted that Phase 2 (Appendix 2) shows a still to be allocated line. This is
mainly to address the repair and upgrading of floating floors across swimming pools,
however at this stage, the scale of the issues and cost is unknown. It is proposed that
a proposal will come back to members once costs are known which will also include
the upgrading of 3-G pitches if funds allow. 
6.  Oversight Arrangements
6.1. A cross service working group has been established which is monitoring progress
and managing the Transformation Fund Budget. The group has highlighted that, as
project briefs are being finalised and tenders received, the exact costs for each
investment will vary from estimated budgets.  
210

Page 211

6.2. There is potential that there may be capacity for additional projects to be funded
should the current list of projects be delivered under the total budget for Phases 1
and 2. The current preferred additional project agreed with the working group would
be to upgrade the current 3-G pitch provision within the SLLC estate. It is currently
known that 3 pitches are of a poor standard with an estimated replacement cost of
£400k per pitch. If funds became available to progress with any or all these pitches,
then a new priority assessment would be carried out. 
7. Employee Implications
7.1.  There is no direct employee implications identified through this report and any
implications arising from individual proposals will be assessed by SLLC prior to
implementation. 
8. Financial Implications
8.1. Capital expenditure will improve the life expectancy and performance of properties as
well as create opportunities for revenue savings and income generation. 
9. Other Implications
9.1. The specification of improvements to the fabric of the properties will take into account
the wider council objectives in terms of energy reduction and carbon footprint. 
10. Integrated Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function, or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. Internal consultation with various Council departments and SLLC. On-
going community consultation wider Parks Masterplan. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
30 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact: 
Craig Jardine, Head of Property Services
Ext 4073 (Tel: 01698 454073)
E-mail: craig.jardine@southlanarkshire.gov.uk 
211

Page 212

PHASE 1       Appendix 1 
Facility Works Budget Project Update
Hamilton
Water Palace,
Hamilton
Ventilation and fabric upgrade and
refurbishment of fitness studio.
£0.5 m Design development underway. Tender
for work to be progressed April 25.
Consultants appointed 
to carry out ventilation / structural surveys.  
Blantyre
Sports Centre
Ventilation and fabric along with
internal remodelling and the gym and
fitness studio modernisation
described below.
£1 m Design development underway. Tender
for work to be progressed April 25.
Mechanical survey completed. Costs
being developed. 
Gym/Fitness
studios
modernisation
programme
Replace all gym equipment across
sites & upgrade studios – this helps
to justify price increases, make
service more competitive.
£1.9 m
Equip. 
£0.84 m 
Studios
Sourcing strategy and project scope
agreed for purchase of gym equipment
across the 12 sites. Tender to be
progressed by April 2025. Equipment to
be drawn down per site as works are
completed. 
Design development underway.
HTR carrying out a pilot on Dollan Aqua
Centre to establish square meterage
costs before rolling out across other sites.
Hamilton,
Rutherglen
and Lanark
Town Halls
Upgrade to modern standard to
maximise use/income and enhance
customer experience. 
Refurb of registrar’s area to create
additional usable space with income
generating potential.
£1.8 m 
£0.3 m 
Lanark Memorial Hall - Design
development underway – completion by
sept 25. 
Hamilton Town Hall - Design development
underway and completion by December
25 
Rutherglen Town Hall - Design brief still to
be finalised. 
Hamilton Registrars area – currently being
considered by Citizens Advice Bureau
(CAB)/ Discussions underway to agree
alterations required, funding and heads of
terms for lease. Design brief developed to
extend area for general letting but this is
currently on hold pending decision from
CAB.
John Wright
Sports Centre
Main Sports Hall floors 1, 2 & 3
require complete replacement. Hall 3
and reception refurbishment.
£0.15 m Design and costs for renewal of Hall 3
underway. 
Awaiting intrusive survey of Hall 1&2 to
determine if floor is suitable for
refurbishment / renewal.   Completion
expected by June 25  
Design development for reception area
almost complete however there is no
scope within this budget to complete
these works. Reception project currently
on hold. 
Fairhill
Lifestyles
Investigate extend the gym area
utilising the corridor along the front of
the building. Increasing size and
capacity of the gym and in turn
increasing income.
£0.005 m
Feasibility
Design development underway and
budget costs being explored. Mechanical
survey being arranged.
Works to be included in Phase 2. 
212

Page 213

Murray Owen,
East Kilbride
Adaptation to accommodate
additional public daytime lets and
diversify use.
£0.10 m Social Work continue to utilise facility
during the day however works have been
identified that will enable SLLC to operate
evening lets. Design brief currently being
finalised with Tender for work to be
progressed April 25.   
Swimming
pool hoists
Improve swimming pool experience
for residents who have access
issues– 9 pools.
£0.12 m Sourcing strategy and specification in
progress with completion by March 25
Hamilton
Palace Sports
Grounds
Accessibility upgrades to Male &
Female Foyer Toilets and
replacement lift 
£0.08 m Unable to deliver both toilets and lift within
available budget. Accessibility
assessment completed and toilet upgrade
to take priority. Design development
underway with completion by June 25. Lift
replacement project on hold. 
James
Hamilton
Heritage Park
Changing Room Refit – Ladies &
Gents including shower.
£0.03 m Design development underway.
Completion by June 25
Coalburn
Leisure Facility
Pool, poolside/changing and fabric
upgrade to enhance customer
experience, increase use and extend
the useful life of the property.
£0.2 m Design development underway. Tender
documentation being finalised. 
Completion by sept 25
Hillhouse and
Earnock CC
Refurbish former library area to
create alternative lettable space.
£0.1 m Design development underway.
Completion by June 25
Chatelherault
Country Park
Refurbishment of reception/foyer/
cafe area to create social dwelling
space. Upgrade to both internal and
external public toilets, and
refurbishment of exhibition space.
Replacement of life expired windows,
doors and gates.
£0.03 m 
Feasibility
Full feasibility study on hold pending wider
country parks master plan project,
however some works to upgrade toilet
and café area have been identified for
inclusion in Phase 2. 
Museum
Stores
Centralising museum stores to
release Crosshouse property for sale
and explore options for public access
to collections on request.
£0.03 m
Feasibility
Alternative storage solution options
currently being investigated. 
Conservatory,
Calderglen
Country Park,
East Kilbride
Roof replacement, energy efficiency
measures and modernisation of
visitor experience following a review
of the future operational
requirements of a zoo and potential
for alternative opportunities such
research /education.
£0.03 m
Feasibility
Full feasibility study on hold pending wider
country parks master plan project,
however, conservatory roof replacement
has been identified as a priority and this
has been included in Phase 2.
Hamilton
Palace Sports
Ground
LED lights upgrade of Indoor Sports
Pitch and Floodlight Conversion for
5-aside pitches & Tennis Courts.
£0.08 m Project designed and costed, ready to
award. 
Lifestyle
Eastfield
Battery storage for solar panels,
improve efficiency of current panels.
£0.05 m Battery storage project explored but found
to be non-viable. Project scope to be
amended to improve air conditioning unit
which will also reduce energy
consumption.
John Wright
Sports Centre
Investigate resolution of Athletics
Hub power supply to allow for LED
upgrade to floodlights and re-
introduction of 11 a-side football
£0.05 m Investigations carried out. Options and
costs for fixing supply issues are currently
being finalised. Likely to exceed budget.
Budget does not cover LED upgrade.
Completion by Sept 25 
Former
Farmcross
Hall,
Rutherglen
Vacant in excess of 5 years without
valid CAT interest, reinstate ground.
£0.05 m Civil Engineer appointed to carry out the
Statutory and H&S requirements. 
Completion by Sept 25 
Former
Bowling
Pavilion,
Carnwath Park
Within public park which has
protected planning status, however
condition deteriorating, reinstate
ground.
£0.05 m Civil Engineer appointed to carry out the
Statutory and H&S requirements.
Completion by Sept 25
213

Page 214

Hamilton
Palace Sports
Grounds
Removal of abandoned Playpark –
Allow for additional parking and
address antisocial behaviour.
£0.08 m Civil Engineer appointed to carry out the
Statutory and H&S requirements.
Completion by Sept 25
Library
reprovision
Setting up of library space in a
number of alternative venues,
locations still to be identified.
£0.3 m Forth Willie Waddell 
- Works in progress.   
Hillhouse/Earnock 
- Works in progress.   
Blantyre 
- Design and costs currently being
finalised 
Greenhills
- Design development underway
Improvements
to Accessibility 
Improving access, door entry, and
security facilities. Centre access
gates at 11 sites plus external
staffing support & remote access.
£0.65 m Sourcing strategy and project scopes
developed for Access Control System and
Access Gates. Procurement being
progressed with tender for work to be
progressed April 25.  Briefs currently
being developed to enable HTR to
complete necessary cabling/connection
works. 
Phase 1
Contingency
5% contingency allowance across
Phase 1 Projects
£0.420* 
PHASE 1 TOTAL  £8.945 
214

Page 215

PHASE 2       Appendix 2 
Facility Works  Budget
Improvements to
accessibility (extended
to include Halls and
Pitches)
Remote access systems for various halls and
pitches. 
£0.500
Fairhill Lifestyles Gym extension. (following phase 1 feasibility)   £0.400
Calderglen Country
Park
Conservatory roof replacement.  £0.350
Chatelherault Country
Park
Toilet and/or café refurbishment.  £0.300
Lifeguard Technology  Implementing lifesaving support technology.  £0.400
Biggar Caravan Park Infrastructure work to support future
investment. 
£0.170
Wifi accessibility
across SLLC venues
Improve the accessibility of Wi-Fi in up to 7
key SLLC venues. 
£0.130
Auchenheath Pavilion  Demolition.  £0.070
Priory Changing
Accommodation 
New modular unit and demolition of old
facility. 
£0.250
Lanark Library  Replacement of windows and roof repairs. 
Original budget available was £460k
therefore an additional £210k is required from
Phase 2 to meet the overall cost. 
£0.210
Funds still to be
allocated 
Awaiting swimming pool floating floor repair
/upgrade costs before this is proposed as a
project. The upgrading of 3-G pitches will
also be under consideration as a future
priority project. 
£0.891
Phase 2 Contingency  5% contingency across phase 2 projects.  £0.197* 
PHASE 2 TOTAL  £3.868  
PHASE 1 and 2 TOTAL  £12.813 
* Given the uncertainty around final costs with design and procurement work on-going a 5%
contingency pot has been built into the overall budget. 
215

Page 216

216

Page 217

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Public Bodies Climate Change Duties - Annual Report
2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Council’s annual Public Bodies Climate Change Duties Compliance
report for 2023/2024, as legally required under the Climate Change (Scotland) Act
2009
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s Public Bodies Climate Change Duties Compliance report for
2023/2024 is approved for submission to the Scottish Government; and
(2) that the Council’s Public Bodies Climate Change Duties Compliance report be
presented for noting to the Climate Change and Sustainability Committee on 18
December 2024. 
3. Background
3.1. The statutory framework for climate action and reporting is outlined by the Climate
Change (Scotland) Act 2009 and the Climate Change (Duties of Public Bodies:
Reporting Requirements)(Scotland) Order 2015. 
3.2. Section 44 of Part 4 of the Climate Change (Scotland) Act 2009 states that a public
body must, in exercising its functions, act:
 in the way best calculated to contribute to the delivery of Scotland’s national
emissions reduction targets
 in the way best calculated to help deliver Scotland’s statutory climate change
adaptation programme
 in a way that it considers is most sustainable 
3.3.  Public bodies are required to prepare annual reports on their compliance with these
duties and publish and submit these reports to the Scottish Government by 30
November each year. 
11
217

Page 218

3.4. The Council has complied with the statutory reporting requirement every year since
its introduction in 2015. The Council has also been reporting climate change action
on a voluntary basis since 2007 as a signatory of Scotland’s Climate Change
Declaration. 
3.5. Due to the Committee timetable this year, it was not possible to present the full report
to the Climate Change and Sustainability (CCS) Committee prior to submission.
Instead, it was agreed at the CCS Committee on 9 October 2024 that the report be
submitted for approval at the Executive Committee meeting on 13 November 2024
and presented to the CCS Committee for noting on 18 December 2024. 
4. Climate Change Duties Report 2023/2024
4.1. The report is in a similar format to previous years and is based on a template issued
by Scottish Government. It contains six sections: 
1 Profile of Reporting
Body
Provides a better understanding of the scale of activity
of the body in addressing climate change in relation to
its size.
2 Governance,
Management and
Strategy
Organisations should be able to demonstrate a robust
system of governance, management and strategy in
respect of duties, decision making and leadership on
climate action.
3 Emissions, Targets
and Projects
Provides data on corporate greenhouse gas (GHG)
emissions arising from organisational activities
including service delivery and the exercise of other
functions.
4 Adaptation Seeks to establish if the body has assessed the
current and future risks climate change presents to its
assets, infrastructure, service provision and business
continuity. Reporting on action and capacity building,
and monitoring and evaluating adaptation progress. 
5 Procurement  Clarify how sustainable procurement policy has had
an impact on climate change reduction, reporting and
compliance issues. 
6 Validation  Demonstrating internal and/or external validation of
data. 
4.2. A copy of the Public Bodies Climate Change Duties report for 2023/2024 can be
found at Appendix 1. Some of the key achievements from the 2023/2024 report are
noted below:   
 There is a robust climate change and sustainability governance structure led by
the Climate Change and Sustainability Committee and supported by the Climate
Change and Sustainability Steering Group. 
 A new Council Climate Change and Sustainability Officers Group has been set
up to support the work of the Climate Change and Sustainability Steering Group.
 A Sustainability Impact Assessment process has been developed and
implemented for the Council’s Capital and Revenue Programmes.  
218

Page 219

 A Strategic Environmental Assessment process is in place that ensures that all
plans, polices and strategies undergo an environment assessment which
includes considering climatic factors.
 Carbon emission reductions of 68.9% have been reported in 2023/2024
compared to the baseline year of 2005/2006. This includes a 9.46% reduction in
2023/2024 compared to the previous year.
 The Council’s Biodiversity Strategy and the Biodiversity Duty Implementation
Plan was approved by the Climate Change and Sustainability Committee in
February 2024.
 South Lanarkshire Council continues to participate in the Climate Ready Clyde
partnership which is a collaborative initiative with an adaptation strategy and
action plan for the Glasgow City Region (which includes all South Lanarkshire’s
rural and urban areas). 
4.3. The information contained in Section 3 of the report provides data on corporate
greenhouse gas (GHG) emissions arising from organisational activities. It details the
Council’s carbon footprint which is currently measured from five sources: 
 Buildings energy
 Fleet
 Employee travel 
 Household waste
 Street lighting  
4.4. Other sources that are reported as part of the Public Bodies Climate Change Duties
report but are currently not included within the Council’s carbon footprint include
waste and water from Council building and homeworking emissions. It was agreed at
the Corporate Management Team meeting on 21 March 2024 that these emissions
would be added to the Council’s carbon management reporting from 2024/2025. 
4.5. The information contained in Section 4 of the report details how the Council is
assessing and adapting to the impacts of climate change. The strategies and plans
relevant to this include the Sustainable Development and Climate Change Strategy,
Risk Management Strategy, Local Development Plans, Local Transport Strategy and
Biodiversity Strategy. 
5. Employee Implications
5.1. The Council’s Policy and Performance Team produce the annual Public Bodies
Climate Change Duties report in conjunction with relevant Council Resources. The
statutory reporting regime has elevated the importance and accountability of climate
change reporting within the Council.   
6. Financial Implications
6.1. Collection of climate change information is a core management task and, therefore,
is absorbed into the daily business operations. 
7. Climate Change, Sustainability and Environmental Implications 
7.1. The Council’s Sustainable Development and Climate Change Strategy outlines the
action to meet our climate change duties and has undergone a full Strategic
Environmental Assessment (SEA).  This can be found on the Scottish Government’s
SEA Gateway database.  
219

Page 220

8. Other Implications
8.1. The annual statutory reporting requirements have implications for all Resources;
however, the following services will have more involvement: 
 Community and Enterprise Resources - Sustainable Development and Carbon
Management, Fleet Services, Environmental Services, Roads and
Transportation, Flood Risk Management, Street Lighting, Waste Services,
Resilience Support, Countryside and Greenspace, Planning and Building
Standards.
 Finance and Corporate Resources – Procurement, Finance (Capital
Investment), Risk Management.
 Housing and Technical Resources - Energy Management, Asset Management
and Property Services. 
8.2. ‘Failure to meet sustainable development and climate change objectives’ is one of
the top risks for the Council. Without a plan in place and a financial plan to support it
then this risk will continue to be one of the Council's top risks. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy; therefore, no impact assessment is required. The
Sustainable Development and Climate Change Strategy 2022-2027 has undergone
full Strategic Environmental Assessment and Equality Impact Assessments. 
9.2. Consultation has been undertaken with all relevant Council Resources in the
preparation of this report. 
David Booth
Executive Director 
24 October 2024 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible  
220

Page 221

Previous References
 Public Bodies Climate Change Duties annual report 2022-23, Climate Change and
Sustainability Committee on 29 November 2023 
List of Background Papers
 The Climate Change (Scotland) Act 2009
 Sustainable Development and Climate Change Strategy 2022-2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Name: Kathryn McCafferty
Designation: Carbon Management Officer
E-mail: kathryn.mccafferty@southlanarkshire.gov.uk  
221

Page 222

Appendix 1 
Public Bodies Climate Change Duties Compliance Report 2023 - 24: South Lanarkshire
Council 
If you need this information in another language or format, please contact us to discuss how we can
best meet your needs. 
Phone 0303 123 1015 
Email equalities@southlanarkshire.gov.uk  
222

Page 223

Part 1: Profile of reporting body 
1(a) Name of reporting body: South Lanarkshire Council 
1(b) Type of body: Local Government 
1(c) Highest number of full-time equivalent staff in the body during the report year: 12,299 
1(d) Metrics used by the body Specify the metrics that the body uses to assess its
performance in relation to climate change and sustainability: 
Metric Unit Value Comments
Population size served population 327,430 Figure taken from mid-year estimate 
1(e) Overall budget of the body   Specify approximate £/annum for the report year: 
£918,074,000 The budget represents the year end budget from our 2023-24 outturn report 
1(f) Report year: Financial (April 2023 to March 2024) 
1(g) Context Provide a summary of the body’s nature and functions that are relevant to
climate change reporting. 
South Lanarkshire is Scotland's fifth largest local authority in terms of population with 327,430 (2022
mid-year estimate) residents living within 154,355 households (National Records of Scotland 2023
household estimate figure). The Council covers 180,000 hectares of land stretching from almost the
centre of Glasgow to the Scottish Borders. The area has a mix of urban, rural, and former mining
environments - almost 80% is classed as agriculture but 70% of the population live in the major
settlements in the north.   
There are four towns in South Lanarkshire with a population of more than 20,000 (East Kilbride,
Hamilton, Rutherglen and Cambuslang) and a further 23 towns and settlements with a population of
over 1,000. 
South Lanarkshire is divided into 20 electoral wards which are represented by 64 Councillors who
are responsible for agreeing the Council's plans and policies and deciding how the Council's budget
should be spent. 
The Council provides services for everyone in this large and diverse geographical area from five
Resources: 
Community and Enterprise Resources comprises various services operating from a wide variety
of locations throughout South Lanarkshire.  The diverse range of services contributes significantly to
the quality of life experienced by both residents and visitors to South Lanarkshire.  Activities include:
maintaining the road and active travel networks; waste disposal and recycling services; street
cleaning and maintaining open spaces; promoting economic development; planning and building
standards; environmental health; trading standards; facilities services within schools and council
offices; bereavement services; fleet; and leading the development and promotion of sustainable
development and climate change action. 
Education Resources is South Lanarkshire Council’s biggest service. There are 54,085 young
people attending nursery, primary, secondary and additional support needs schools in South
Lanarkshire. Education is both a national and local priority. The service aims to raise achievement
and attainment and improve young people’s health and wellbeing. The main focus is on raising
standards, particularly in numeracy and literacy and in closing the gap between the most and least
223

Page 224

disadvantaged children so that every child has the same opportunity to succeed. Also, to provide
young people with the necessary skills for life and work. 
Finance and Corporate Resources provides the framework of support which allows the Council to
deliver its wide range of services on behalf of local people.  Services throughout the Resource
include: overseeing the Council’s budget; revenue; Customer Services Centre; digital
transformation; human resources; registrars and licencing; audit; communications; and legal
services. 
Housing and Technical Resources is the third largest social landlord in Scotland and delivers a
range of key housing management, homelessness, and property and repairs services. Activities
include: managing just over 25,000 homes for tenants; support to prevent and alleviate
homelessness; adapting homes for independent living; maintenance, repair and improvements to
the Council’s properties; and asset management. 
Social Work Resources supports social welfare and provide effective care and support to meet the
needs of vulnerable people in South Lanarkshire. Activities include: assessment and support;
targeted services for vulnerable children, young people and adults; providing care at home;
community support services; respite and residential services; and supporting carers. 
South Lanarkshire Leisure and Culture is a Scottish Charitable Incorporated Organisation
delivering services on behalf of South Lanarkshire Council including the operation, management and
development of indoor and outdoor sport and leisure facilities, community halls, arts venues, country
parks, libraries and museum services. 
The scope of South Lanarkshire Council's carbon footprint includes the energy used in our buildings,
household waste sent to landfill and for processing/recycling, the fuel used in our fleet of vehicles,
energy used for our street lighting and miles travelled as business travel. These are considered the
most appropriate sources to measure with robust data collected and converted into carbon using the
carbon conversion factors published each year by the Department for Energy Security and Net Zero.   
The data includes emissions reporting from South Lanarkshire Leisure and Culture SCIO.   
224

Page 225

Part 2: Governance, management and strategy 
2(a) How is climate change governed in the body? Provide a summary of the roles performed
by the body’s governance bodies and members in relation to climate change. If any of the
body’s activities in relation to climate change sit outside its own governance arrangements
(in relation to, for example, land use, adaptation, transport, business travel, waste,
information and communication technology, procurement or behaviour change), identify
these activities and the governance arrangements. 
Sustainable Development, including climate change duties compliance is a priority objective for the
Council. This is reflected in the Council Plan and the Council's Sustainable Development and Climate
Change Strategy (SDCCS).   
The climate change agenda is governed through the Council's Climate Change and Sustainability
Committee which has decision making powers to help to accelerate the pace and scale of action
needed in response to the climate emergency and meet challenging climate change national targets.  
The Committee is supported by the Climate Change and Sustainability Steering Group which is
made up of senior managers from all Council Resources and has responsibility for overseeing the
implementation of the SDCCS; compliance with the climate change duties; embedding sustainable
development within Council policy; and the scrutiny of performance monitoring reports.  Progress on
the Council's SDCCS and complying with our climate change duties are reported to the Climate
Change and Sustainability Committee biannually using IMPROVe (the Council's performance
management system). 
A Climate Change and Sustainable Development Officers Group has been established to support
strategic direction, oversight, and guidance on climate change mitigation, adaptation, and
sustainability initiatives within South Lanarkshire Council. The group will work to ensure that South
Lanarkshire Council aligns its operations, policies, and practices with sustainable and
environmentally responsible principles, aiming to mitigate climate change impacts and promote
sustainability. 
The Strategic Environmental Assessment (SEA) Corporate Working Group is a cross-resource group
that works together to ensure that all plans, polices and strategies undergo the SEA process which
includes assessment of climatic factors. The SEA group feeds into the Steering Group and reports
progress of the Council’s SEA process to the Climate Change and Sustainability Committee. 
225

Page 226

The following diagram outlines governance, management and strategy for the Council: 
2(b) How is climate change action managed and embedded by the body? Provide a summary
of how decision-making in relation to climate change action by the body is managed and how
responsibility is allocated to the body’s senior staff, departmental heads etc. If any such
decision-making sits outside the body’s own governance arrangements (in relation to, for
example, land use, adaptation, transport, business travel, waste, information and
communication technology, procurement or behaviour change), identify how this is managed
and how responsibility is allocated outside the body 
Sustainable Development and Carbon Management sits within the Performance and Development
Team of Community and Enterprise Resources. The Performance and Development Team have a
strategic overview of the Council's progress to reduce carbon emissions, climate change adaptation
and environmental sustainability and work with all Council Resources to build capacity on climate
change awareness.   
The Performance and Development Team are responsible for developing the Sustainable
Development and Climate Change Strategy (SDCCS) and yearly action plan in conjunction with all
Resources. The SDCCS action plan is monitored and reported using the Council's IMPROVe
system. The SDCCS action plan is reported bi-annually to the Climate Change and Sustainability
Committee using the progress update in IMPROVe. Many of the SDCCS actions are embedded in
Resource and Service plans which results in many employees having climate change actions
included in their key work objectives as part of their annual performance development review.   
The Council also has a ‘Behaviours Framework’ which sets out 5 key principles of how employees
are expected to approach their work.  The first principle is ‘Efficient’ which includes taking action to
ensure sustainability and minimising environmental impact. Employees must evidence how they
contribute to this principle as part of their annual review.  The Behaviours Framework helps to embed
sustainability and climate change considerations in the culture of the Council.  
226

Page 227

The Council has corporate key performance measures that all Resources must comply with that
contribute to meeting the climate change duties. Each Resource reports progress on these
measures, on a quarterly basis using IMPROVe, to each Resource’s committee. 
The Council has taken steps to further embed climate change action across the organisation. Staff
engagement and awareness activities are ongoing including Keep Scotland Beautiful bespoke
carbon literacy training for elected members and officers, an e-learning module on climate change
and sustainability, climate change and sustainability sessions in the management development
programme and regular articles on the staff intranet.  The Council has a Sustainable Development
and Climate Change Communications Plan. The purpose of the Communications Plan is to identify
suitable communication methods and approaches for: 
• promoting and raising awareness of the vision, themes and priorities of the sustainable
development and climate change strategy.
• promoting the climate positive work which is already happening in our communities and
encourage others in the community to undertake climate positive action. 
• informing council employees about upcoming events or useful information.
• sharing information about funding opportunities. 
The SEA Corporate Working Group provides a mechanism to liaise with council services to ensure
that relevant plans, polices and strategies include the climate change duties considerations and any
actions accordingly. 
The Sustainable Development Adviser is also part of the Council's procurement network. The
Council’s sustainable procurement objectives, in accordance with the Sustainable Procurement
Duty, are set out in the Procurement Strategy.   
The following diagram outlines how climate change is managed and embedded in the Council: 
227

Page 228

2(c) Does the body have specific climate change mitigation and adaptation objectives in its
corporate plan or similar document?  Provide a brief summary of objectives if they exist. 
Objective Doc Name Doc Link
The Council Plan has 3 priorities – 
People, Progress and Planet. 
Planet – we need to work towards a
sustainable future in sustainable
places. 
We will act in ways that protect our
natural world for a healthier future.
We will work together to develop
local solutions to protect nature and
to take action on climate change
and support our young people to
lead the way.
The Council’s Corporate
Plan: Connect 2022–
2027-page 10
Plans and policies - South
Lanarkshire Council 
2(d) Does the body have a climate change plan or strategy?  If yes, provide the name of any
such document and details of where a copy of the document may be obtained or accessed. 
The Council's Sustainable Development and Climate Change Strategy (SDCCS) 2022-2027,
published on the Council website, has been prepared following extensive public consultation which
helped to shape the strategic vision and themes of the strategy. It outlines the changes in sustainable
development and climate change policy since the publication of the last strategy, and the Council's
strategic priorities for sustainable development and climate change over the five-year period.  This
is the Council's fourth strategy, the first was published in 2007, and covers the actions taken
throughout the reporting period FY 2023-24. 
The main principles of the SDCCS are: 
• Promote opportunities to support climate change mitigation and adaptation.
• Promote improvements in human health and wellbeing and reduce inequality across South
Lanarkshire.
• Promote the protection of a functioning environment.
• Promote sustainable economic growth and sustainable communities.
• Promote the benefits of greenspace and biodiversity across urban and rural areas of South
Lanarkshire.
• Promote the benefits of sustainable development and infrastructure and encourage sustainable
living. 
• Promote the importance of effective corporate and partnership working to achieve better
outcomes for South Lanarkshire. 
Carbon management and emissions reduction actions are incorporated into the Sustainable
Development and Climate Change Strategy 2022-2027. 
2(e) Does the body have any plans or strategies covering the following areas that include
climate change?  Provide the name of any such document and the timeframe covered.  
Topic Document Link Time period Comments
Adaptation Local
Development
Plan
Local
development
plan 
2020 - 2025 Climate adaptation is
embedded throughout
the plan – in particular
Policy 1: Spatial
228

Page 229

Topic Document Link Time period Comments
Planning, Policy 2:
Climate Change, Policy
13: Green Network and
Greenspace, and Policy
16: Water Environment
and Flooding.
Adaptation Biodiversity
Strategy
Biodiversity
Strategy 2024 -
2030 
2024 - 2030 Climate change
adaptation is
incorporated into
Chapter 3: Our eco-
systems and challenges.
Adaptation Local
Transport
Strategy
Local transport
strategy 
2013 – 2023
(A new
strategy that
cover the
period 2024 -
2034 is in
development)
LTS includes adaptation
through Flood Risk
Management. 
Adaptation Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Climate adaptation is
embedded throughout
the strategy.
Adaptation Local Flood
Risk
Management
Plans
(LFRMP) - 
Clyde and
Loch Lomond,
and Tweed
Local flood risk
management
plan 
2022- 2028 The Flood Risk
Management team also
have 'Response to
Flooding' procedures.
Business travel Air quality
Action plan
Air quality
action plan 
2024 -2029 The air quality action
plan includes a number
of measures to
encourage a shift to
walking, cycling and
public transport instead
of the reliance of private
car.
Business travel Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 4: Improve
affordable, sustainable
and accessible transport
options. 
Energy efficiency Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 5: Progress a
transition to net-zero,
energy efficient and
climate resilience
homes, buildings and
infrastructure.
Energy efficiency Local Housing
Strategy 
Local Housing
Strategy 
2022-2027 Chapter 2: Housing
Quality, Energy
Efficiency and
Decarbonisation.
Fleet transport Air quality
Action plan
Air quality
action plan 
2024-2029 South Lanarkshire
provide fleet operators,
including the Council's
229

Page 230

Topic Document Link Time period Comments
own fleet, free access to
assessment and tailored
guidance to assist fleet
operators in becoming
more economic in terms
of fuel, emissions and
costs.
Fleet transport Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 4: Improve
affordable, sustainable
and accessible transport
options.
Land Use Core Paths
Plan 
Core paths
plan South
Lanarkshire
Council 
The CPP provides
easier access to the
outdoors and the
countryside and helps to
promote active travel.
Land Use Contaminated
Land Strategy
Contaminated
Land Strategy 
The CLS provides
opportunities for future
land use changes to
mitigate the effects of
climate change. 
Land Use Local
Development
Plan
Local
development
plan 
2020 - 2025 Land use is featured
throughout the LDP
however the most
relevant policies are
Policy 1: Spatial
Strategy, Policy 2:
Climate Change, Policy
13: Green network and
greenspace.
Land Use Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 9: Enhance,
protect, and respect the
outdoors and the natural
and historic
environment.
Renewable
energy
Local
Development
Plan
Local
development
plan 
2020 - 2025 Policy 1: Spatial
Planning, Policy 2:
Climate Change, and
Policy 18: Renewable
Energy.
Renewable
energy
Local Heat
and Energy
Efficiency
Strategy
Local Heat and
Energy
Efficiency
Strategy
(LHEES) 
2024 - 2028 Priority 2: Transition to
zero direct emissions
heating systems in
buildings across South
Lanarkshire to tackle
climate change.
Renewable
energy
Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 5: Progress a
transition to net-zero,
energy efficient and
climate resilience
homes, buildings and
infrastructure.
Staff Travel Employee
Travel Plan
Employee
travel plan 
The staff travel plan was
refreshed in March 2020
however was not
230

Page 231

Topic Document Link Time period Comments
published due to impact
of Covid19 pandemic.
Changes in working
arrangements for
employees will require
the employee travel plan
to be reviewed again.
Sustainable/
renewable heat
Local
Development
Plan
Local
development
plan 
2020 - 2025 Sustainable/renewable
heat is included in Policy
2: Climate Change.
Sustainable/
renewable heat
Local Housing
Strategy
Local Housing
Strategy 
2022-2027 Chapter 2: Housing
Quality, Energy
Efficiency and
Decarbonisation.
Sustainable/
renewable heat
Local Heat
and Energy
Efficiency
Strategy
Local Heat and
Energy
Efficiency
Strategy
(LHEES) 
2024 - 2028 Priority 2: Transition to
zero direct emissions
heating systems in
buildings across South
Lanarkshire to tackle
climate change.
Waste
management
Local
Development
Plan
Local
development
plan 
2020 - 2025 Policy 2: Climate
Change, and Policy: 18
Waste
Waste
management
Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development
and Climate
Change
Strategy 
2022-2027 Priority 8: Take action to
allow South Lanarkshire
to become a zero-waste
society
Other (please
specify in
comments)
Air quality
Action plan
Air quality
action plan 
2024 - 2029 The air quality action
plan includes a measure
to incorporate green
infrastructure integration
to reduce emissions
within air quality
management areas
Other (please
specify in
comments)
Procurement
Strategy
Procurement
strategy 
2023 - 2028 Sustainable
Procurement - includes
contribution to
sustainable procurement
duty and the climate
emergency 
2(f) What are the body’s top 5 priorities for climate change governance, management and
strategy for the year ahead?  Provide a brief summary of the body’s areas and activities of
focus for the year ahead. 
1. Implement the 2024-25 action plan for the Sustainable Development and Climate Change
Strategy.
2. Further embed sustainable development and climate change into the Council’s decision-making
processes. Identify potential for development and piloting of an integrated sustainable
development decision making tool to be applied to projects and initiatives. 
3. Review current strategic net zero work being undertaken by the Council and consider the
development of a standalone carbon emission reduction plan. 
4. Development of a climate risk register upon which action planning, decision-making and
monitoring will be built upon with regards to climate change adaptation and resilience. 
5. Implement a robust communications plan for promoting and raising awareness of the
sustainability, climate change and adaptation agenda within the SLC, national and global context.
231

Page 232

This sets out the Council’s overarching framework for engaging the people of South Lanarkshire
in relation to sustainable development and climate change. 
2(g) Has the body used the Climate Change Assessment Tool (CCAT) (a) or equivalent tool to
self-assess its capability - performance?  If yes, please provide details of the key findings
and resultant action taken. 
A Climate Change Assessment Tool (CCAT) was last carried out in early 20024 as part of the
development of the 2024-25 action plan development. The Leadership Climate Emergency Checklist
was also used to review the Council’s compliance with reporting duties and to identify areas for
improvement. Workshops were held with the both the Climate Change and Sustainability Steering
Group and Officers Group to assess performance and identify the key priority areas and actions for
improvement. The key findings are as follows: 
232

Page 233

Leadership Checklist Workshop Outcomes
Theme SLC Current
Rating 
Improvement Actions Identified
Strategy Advanced  Climate Change, Sustainability and
Environmental Implications section in reports –
corporately encourage officers to embed
scrutiny into reports, key issues to be listed  at
this section. 
Targets Foundation  National targets are reported on, however, step
targets are now required
Tangible actions and projects required for each
service to ensure progress is being made. 
Governance Advanced  Influencing role needs to be expanded to move
to exemplary
Broaden our governance structure to include
partners (e.g. SPT, NHS, SPEN and other
energy providers). 
Delivery Foundation  Co-ordination with all Resources to ensure
targets are met
Increase reporting to Climate Change and
Sustainability Committee
Increase visibility of what is happening council
wide, share good practice. 
Finance Foundation Spend needs to be aligned with climate change
targets (Steps being taken to address this for
example Sustainable Impact assessments for
the capital budget process).
Performance Advanced  Share and review reporting with Stakeholders
Increase and encourage peer review (for
example the Public Sector Duties reporting)
Communicate more effectively externally 
Skills Foundation Review training requirements for all staff 
Make Climate Change LOL modules
mandatory
Encourage as part of the staff appraisal
process 
The outputs from these workshops and the identified improvement actions will inform the
development of a net zero route map. 
2(h) Supporting information and best practice. Provide any other relevant supporting
information and any examples of best practice by the body in relation to governance,
management, and strategy. 
233

Page 234

A Climate Change and Sustainability Committee was established in 2019.  This was in response to
both the UK and Scottish Governments declaring a climate emergency in May 2019 and new national
climate change targets introduced (net-zero greenhouse gas emissions by 2050 in UK and by 2045
in Scotland). To support the work of the Committee a cross-resource Steering Group was established
to provide senior level management and guidance on the actions required in the Council’s transition
to a net zero economy and society, help to build resilience to climate risks, and address the climate
emergency. A Climate Change and Sustainable Development Officers Group has also been
established to support the work of the Committee and Steering Group. 
South Lanarkshire Council also participate in the Sustainable Scotland Network Local Authority
Forum and have been an active member of the network with participation in both Finance and
Reporting Action Groups and presenting at member events.   
Part 3: Emissions, targets and projects 
3(a) Emissions from start of the year which the body uses as a baseline (for its carbon
footprint) to the end of the report year 
Reference
Year
Year Scope 1 Scope 2 Scope 3 Total
tCO2e
Comments
Baseline
carbon
footprint
2005-
06
42,014 50,836 63,115 155,965 Water is not included. Emission
factors were set at baseline year and
have not been updated for any
subsequent year. Scope 1= buildings
gas and oil and fleet; Scope 2=
buildings and street lighting electricity;
Scope 3=waste, staff travel.
Year 1  2006-
07
40,119 49,806 61,956 151,881 Comment as above
(in baseline year)
Year 2 2007-
08
39,655 52,085 59,597 151,337 Comment as above
(in baseline year)
Year 3  2008-
09
38,168 52,797 56,658 147,623 Comment as above
(in baseline year)
Year 4  2009-
10
41,637 50,846 52,349 144,832 Comment as above
(in baseline year)
Year 5  2010-
11
40,263 50,645 50,356 141,264 Comment as above
(in baseline year)
Year 6  2011-
12
36,510 51,081 47,665 135,256 Water is not included. Emission
factors were set at baseline year and
have not been updated for any
subsequent year. Scope 1= buildings
gas and oil and fleet; Scope 2=
buildings and street lighting electricity;
Scope 3=waste, staff travel and pool
cars.
Year 7  2012-
13
39,999 53,216 46,226 139,441 Comment as above
(in year 2011-12)
Year 8  2013-
14
37,119 51,383 47,513 136,015 Comment as above
(in year 2011-12)
Year 9  2014-
15
35,269 47,850 42,084 125,203 Comment as above
(in year 2011-12)
Year 10  2015-
16
35,498 45,071 39,707 120,276 Comment as above
(in year 2011-12)
234

Page 235

Reference
Year
Year Scope 1 Scope 2 Scope 3 Total
tCO2e
Comments
Year 11  2016-
17
34,017 38,950 37,927 110,894 Comment as above 
(in year 2011-12)
Year 12 2017-
18
34,599 36,860 42,656 114,115 Comment as above 
(in year 2011-12) 
Year 13 2018-
19
32,863 35,378 31,942 110,183 Comment as above 
(in year 2011-12)
Year 14 2019-
20
33,583 14,966 18,783 67,282 Water is not included. Emission
factors are updated annually. Scope
1= buildings gas and oil and fleet;
Scope 2= buildings and street lighting
electricity; Scope 3=waste, staff travel
and pool cars
Year 15 2020-
21
32,530 12,256 9,805 54,591 Comment as above 
(in year 2019-20)
Year 16 2021-
22
31,989 11,807 12,002 55,798 Comment as above 
(in year 2019-20)
Year 17 2022-
23
32,869 11,781 8,904 53,554 Water is not included. Emission
factors are updated annually. Scope
1= buildings gas and oil and fleet;
Scope 2= buildings and street lighting
electricity and EV pool cars; Scope
3=waste, staff travel (own cars).  
Year 18  2023-
24
30,281 11,982 6,223 48,486 Comment as above 
(in year 2022-23) 
3(b) Breakdown of emission sources 
Emission
source Scope
Consumption
data Units
Emissions
(tCO2e) Units Source
Biomass 1 2,953,456 kWh 31.72 kgCO2e/kWh Buildings
Gas Oil 1 3,744,192 kWh 960.37 kg CO2e/kWh Buildings
Natural Gas 1 122,197,176 kWh 22,353.4 kg CO2e/kWh Buildings
Diesel (average
biofuel blend) 1 2,651,353.57 litres 6,660.37 kg CO2e/litre Fleet
Gas Oil 1 51,045 litres 140.65 kg CO2e/litre Fleet
Petrol (average
biofuel blend) 1 79,257 litres 166.24 kg CO2e/litre Fleet
Grid Electricity
(generation) 2 49,387,797 kWh 10,226.94 kg CO2e/kWh Buildings
Average
business travel
car - Battery
Electric Vehicle 2 917,093 kWh 77.56 kg CO2e/mile
Electric
vehicles
(Fleet)
Grid Electricity
(generation) 2 8,063,979 kWh 1,669.84 kg CO2e/kWh
Street
Lighting
235

Page 236

Emission
source Scope
Consumption
data Units
Emissions
(tCO2e) Units Source
Average Car -
Unknown Fuel 3 1,185,436 miles 329 kg CO2e/mile
Staff travel
(own
vehicles)
Grid Electricity
(transmission
and distribution
losses) 3 49,387,797 kWh 884.79 kg CO2e/kWh Buildings 
Water supply 3 411,485
Cubic
metres 41.15
kgCO2e/cubic
metres Buildings
Grid Electricity
(transmission
and distribution
losses) 3 8,063,979 kWh 144.47 kg CO2e/kWh
Street
Lighting
Refuse Municipal
to combustion 3 79,133 tonnes 1,684
kg
CO2e/tonne Waste
Refuse Municipal
to composting 3 18,695 tonnes 166.62
kg
CO2e/tonne Waste
Refuse Municipal
to Landfill 3 6,259 tonnes 3,111
kg
CO2e/tonne Waste
Refuse Municipal
to mixed
recycling 3 46,238 tonnes 983.98
kg
CO2e/tonne Waste
Homeworking 3
15%
workforce kWh 804.61 
kg
CO2e/FTE/
annum
Estimated
figure using
PBDR
Guidance 
Total 50,436.71 (Home working, biomass emissions and grid electricity (transmission and
distribution losses) are included in 3b but not in 3a) 
3(c) Generation, consumption and export of renewable energy. Provide a summary of the
body's annual renewable generation (if any), and whether it is used or exported by the body. 
Renewable
Electricity
Renewable Heat 
Technology Consumed by
organisation (kWh)
Consumed by
organisation (kWh)
Comments
Solar PV 1,412,496  67 sites with PV systems 
Biomass  2,953,456 49 sites with Biomass heating 
All renewable electricity and heat generated is consumed by the organisation. 
3(d) Organisational Targets. List all of the body’s targets of relevance to its climate change
duties. 
236

Page 237

Name of
target
Target Scope of
target
Baseline
Year 
Baseline
figures
(tCO2e)
Target
completion
year
Progress
against
target 
(tCO2E)
(2023/24
figure)
Zero direct
emissions
Reduce to zero
emissions 
Energy use
in buildings
(gas and oil) 
2005 31,595  2038 23,314
Zero direct
emissions
• New cars and light
commercial vehicles -
zero emissions from
2025 
• All larger new
vehicles - zero
emissions by 2030 
• Petrol/diesel HGVs
phased out from 2030
Fleet  2005 10,417  2025 and
2030
6,967
Reducing
indirect
emissions
Reduce to as close to
zero as soon as
possible 
Energy use
in buildings
(electricity) 
2005 37,831 2045 10,227
Reducing
indirect
emissions
Reduce to as close to
zero as soon as
possible 
Waste
collected
from
households 
2005  61,320 2045 5,945
Reducing
indirect
emissions
Reduce emissions as
quickly as possible and
In line with relevant
transport policies.
Staff travel
(travel in
personal
vehicles) 
2005 1,795 2045 278
Reducing
indirect
emissions
Reduce to as close to
zero as soon as
possible 
Street
lighting 
2005  13,005 2045 1,681
Reduce
overall
carbon
footprint
Reduce to as close to
zero as soon as
possible
Council
carbon
footprint
2005 155,965 2045 48,486 
3(d)a How will the body align its spending plans and use of resources to contribute to
reducing emissions and delivering its emission reduction targets?     
All Council committee reports include a section on 'Climate Change, Sustainability and
Environmental Implications' to ensure that these implications are fully assessed and taken into
consideration when making decisions. The capital programme bid, and approval process includes
an environmental assessment which ensures all environmental impacts, both positive and negative
are considered when making decisions.  The Annual Revenue Budget process includes information
on the environmental impact of budget additions and the savings package, to ensure that the impact,
positive or negative, is considered when making decisions.                         
In September 2023, a Sustainability Impact Assessment process was introduced as part of the
capital and revenue budget which ensures that factors related to carbon reduction, climate change
adaptation and the wider principles of sustainable development are included in the decision-making
process. As part of the annual budget process, assessments of the impact of projects, and changes
237

Page 238

to the revenue budget, are prepared and shared with Members, prior to them making decisions
around these budgets. 
3(d)b How will the body publish, or otherwise make available, it's progress towards achieving
its emissions reduction targets?   
Performance on all actions relating to the Council's Sustainable Development and Climate Change
strategy are made available via the Council’s Climate Change and Sustainability Committee update
reports which are uploaded to the Council website. This includes reporting on progress towards
emissions reduction targets. The Public Bodies Climate Change Duties Report is also published on
the Council website.   
3(e) Estimated total annual carbon savings from all projects implemented by the body in the
report year 
Emissions Source Total estimated annual
carbon savings (tCO2e)
Comments
Electricity 35 LED lighting and PV installations projects 
3(f) Detail the top 10 carbon reduction projects to be carried out by the body in the report
year Provide details of the 10 projects which are estimated to achieve the highest carbon
savings during report year.   
Project  Funding
source
Capital cost
(£)
Project
lifetime
(years)
Fuel/
emission
source
saved
Estimated
carbon savings
per year (tCO2e/
annum)
PV Panels – Calderwood
Primary School
CEEF  75,000   25 Electricity  7
PV Panels – High
Blantyre Primary School
CEEF  75,000 25 Electricity  7
PV Panels – St Peters
Primary School
CEEF  60,000  25 Electricity  5.5
LED lighting* – 10 sites CEEF 150,000 10 Electricity  10
PV Panels – Deer Park
Sheltered Housing
Complex
Housing
Capital
Programme
75,000 25 Electricity 5.5
*LED projects reported as one project 
3(g) Estimated decrease or increase in the body's emissions attributed to factors (not
reported elsewhere in this form) in the report year.  If the emissions increased or decreased
due to any such factor in the report year, provide an estimate of the amount and direction. 
n/a 
3(h) Anticipated annual carbon savings from all projects implemented by the body in the year
ahead 
238

Page 239

Source Total estimated annual
carbon savings (tCO2e) 
Comments
Electricity 40 4 PV projects 
Natural Gas 55 Our Lady of Lourdes Primary –
replacement of gas heating with air
source heat pump and other energy
efficiency measures. 
3(i) Estimated decrease or increase in the body's emissions attributed to factors (not reported
elsewhere in this form) in the year ahead  If the emissions are likely to increase or decrease
due to any such factor in the year ahead, provide an estimate of the amount and direction. 
Emissions Source Total estimated annual
emissions  savings (tCO2e) 
Comments
Estate changes 150 Removal of properties from Council
Estate via Community Asset Transfers
and other closures 
3(j) Total carbon reduction project savings since the start of the year which the body uses as
a baseline for its carbon footprint. If the body has data available, estimate the total emissions
savings made from projects since the start of that year ("the baseline year"). 
Unknown 
3(k) Supporting information and best practice. Provide any other relevant supporting
information and any examples of best practice by the body in relation to its emissions, targets
and projects. 
Carbon management actions, targets and projects are incorporated into the Sustainable
Development and Climate Change Strategy and Action Plan. Updates are reported on the Council
website. Carbon Management Reports outlining the yearly and mid-yearly carbon emissions
reductions are presented to the Climate Change and Sustainability Committee. This demonstrates
our commitment to reducing our carbon footprint and reporting in a transparent manner. 
Part 4: Adaptation  
4(a) Has the body assessed current and future climate-related risks?  If yes, provide a
reference or link to any such risk assessment(s). 
The Council’s Risk Management Team assists in the identification and evaluation of risks associated
with the delivery of the Council's objectives and provide support to help manage these risks. The risk
management team manage the Council's risk register and one of the top risks identified is ‘Failure
to meet sustainable development and climate change objectives’. The risk scorecard identifies the
business impacts of climate change now and in the future and contains control measures such as
ensuring that the climate change duties are embedded in policies, plans and strategies and working
with services to raise the awareness of the business risks of a changing climate.  
Severe weather is also one of the risks in the Council's risk register.  Across the Council the impacts
of severe weather on the functionality and responsiveness of individual services are recognised.
These council functions range from flood defence management to local planning. The Council’s
Corporate Contingency Plan sets out how it will work with partners to deal with emergencies,
including the impacts of severe weather events. The Council’s Emergency Management Team (EMT)
239

Page 240

leads on responding to emergencies. The EMT is made up of senior managers from Services who
may be involved in dealing with emergencies and led by the Council's Resilience Adviser.   
The South Lanarkshire area is covered by the West of Scotland Resilience Partnership which has
representatives from the emergency services, councils, NHS boards and utilities companies. The
West of Scotland Community Risk Register includes severe weather incidents, the possible
consequences and what the Regional Resilience Partnership are doing to mitigate the risks.
Assessing Future Climate Risks
The Council has a dedicated Flood Risk Management Team who manage flooding priorities and
deliver prioritised flood protection schemes. In accordance with the requirements of the Flood Risk
Management (Scotland) Act 2009, the Flood Risk Management Team has been involved in the
publication of the Clyde and Loch Lomond Local Plan District and the Tweed Local Plan District
Flood Risk Management Plans. The production of these plans has involved a national flood risk
assessment and identification of potentially vulnerable areas. Flood risk assessments and the
implementation of sustainable drainage systems are required as part of the planning process for any
new builds developments.  These future flood risks are also incorporated into the Local Development
Plan 2.
The impacts from increased rainfall are the area’s biggest climate change risks, however the
challenges from rising temperatures and sea levels will also bring risks as well as opportunities for
the area.  To understand these risks further, and what action is required to mitigate them, the Council
is an active member of the Climate Ready Clyde partnership, a collaborative initiative that has
developed an Adaptation Strategy and Action Plan for the Glasgow City Region (which includes all
of South Lanarkshire, both rural and urban areas).     
4(b) What arrangements does the body have in place to manage climate-related risks?  
Provide details of any climate change adaptation strategies, action plans and risk
management procedures, and any climate change adaptation policies which apply across the
body 
The Sustainable Development and Climate Change Strategy 2022-2027 includes the Council's
approach to managing climate change adaptation.  Within the ‘Sustainable Places’ theme the
intention is to work in partnership to ensure local infrastructure, buildings and communities are
resilient to the impacts of climate change. This theme builds on work already happening across
South Lanarkshire to improve communities and place, although it will do this through a sustainable
development and climate lens which will take the diversity of rural and urban South Lanarkshire into
account. 
The Council’s Risk Management Strategy aims to provide a sensible and proportionate approach to
risk management that promotes awareness rather than avoidance. Resources are required to ensure
that risk management is embedded in service planning and delivery; in the way they make decisions;
in major projects; and in their dealings with partners and contractors. The Council also has a
corporate Business Continuity Plan which is managed by the Resilience Adviser. South Lanarkshire
Council is a category 1 responder and leads the Local Resilience Partnership on work required to
meet the Civil Contingencies Act 2004 and its associated Scottish Regulations and Guidance as part
of Scotland Regional Resilience Partnership. 
In addition, the Council has the following strategies and plans which include policies and actions to
address climate related risks: 
Local Development Plan 2 (2020-2025) 
A key theme running through the Local Development Plan 2 is the need to address the land use
issues arising from the impact of climate change.
• Policy 2: Climate Change – proposals for new development must, where possible, seek to
minimise and mitigate against the effects of climate change.
• Policy 13: Green network and Greenspace - Development proposals should safeguard the
green network, as identified on the proposals map, and identify opportunities for
240

Page 241

enhancement and/or extension which can contribute towards mitigating greenhouse gases
and adapting to the impacts of climate change.
• Policy 16: Water environment and flooding - the avoidance principle of flood risk management
as set out in Scottish Planning Policy must be met. 
Managing Flood Risk 
The Flood Risk Management team have procedures aimed at reducing flood risk and managing the
impacts of flood events, called the “Managing Flood Risk2 procedure, which is reviewed annually
and takes cognisance of the effects of climate change upon predicted flood risk. Flood risk
assessments and the implementation of sustainable drainage systems are required as part of the
planning process for any new builds or developments. 
Local Transport Strategy 2013-2023 
The Local Transport Strategy includes the following key objectives relating to climate change
adaptation: 
• Improve health and wellbeing by facilitating and encouraging active travel, through the
development of attractive, safe and convenient walking and cycling networks
• Mitigate, adapt and manage the effects of climate change, including flooding, on transport
infrastructure and communities. 
A new Local Transport Strategy is under development and due to be published later in 2024. 
Biodiversity Strategy 2024- 2030
Climate change is identified as a key cross-cutting theme in the Biodiversity Strategy 2024-2030 that
affects all ecosystems. Issues related to this are identified and addressed where possible. Peatland
management which benefits carbon sequestration remains a key theme. The Biodiversity Duty
Implementation Plan 2024-2026 (BDIP) encourages appropriate management of the council estate. 
The BDIP, through the planning function, encourages other landowners and developers to adopt the
principles of the Biodiversity Strategy in their land use. This is especially important in woodland cover
and peatland conservation for carbon management and intrinsic biodiversity. 
4(c) What action has the body taken to adapt to climate change?  Include details of work to
increase awareness of the need to adapt to climate change and build the capacity of staff and
stakeholders to assess risk and implement action.   
Delivering adaptation actions:
• The Flood Risk Management team continue to be consulted regularly during the Planning
and Development Management process to ensure all new developments are being designed
in accordance with the latest guidance on flood risk, climate change and the sustainable
management of surface water.
• The Council continues to encourage active travel by extending the network of walking and
cycle routes.
• A number of Active Travel Studies have been completed for all areas of South Lanarkshire
The priorities identified in these studies will be reviewed as part of the development of the
new Local Transport Strategy. 
• The Council has signed the Clyde Climate Forest Concordat committing to actively participate
in, and promote, the realisation of Clyde Climate Forest (CCF) targets; increase the average
tree canopy cover to 20%, increase the average broadleaf network by 20% and increase
forest and woodland cover in Glasgow city region to 20% by 2032 (totalling 18 million trees
planted across the region over the next decade as a response to the Climate and Ecological
Emergencies).
• A high-level study has been completed to identify opportunities for tree planting on all South
Lanarkshire Council’s owned or controlled land as part of the councils plans to achieve net
zero. A more detailed investigation and pipeline of tree planting and afforestation projects for
funding is being developed. 
• A Tree Canopy Cover Strategy is being developed to protect, enhance and manage a thriving
canopy cover that broadens community engagement in local urban forest planning and
241

Page 242

improves community and canopy cover resilience to climate change, pests and storm events
through best management and maintenance practices.
• An Ash Dieback Disease Action and Recovery plan is being developed.
• A biosecurity statement is being developed to promote implementation and understanding
of good practices to help safeguard the future of our trees from the introduction and spread
of other harmful organisms. 
• Continue to contribute to the flagship actions in Climate Ready Clyde’s climate adaptation
strategy and action plan.  
• Ongoing peatland conservation at Langlands Moss to help ensure the long-term viability of
the site as a peat bog that can contribute to biodiversity, flood management and carbon
storage. 
• The Making Space for Pollinators  report (2024) highlights the work and commitment we have
made in improving grasslands for pollinators and wildlife throughout South Lanarkshire.
Greater plant species-richness is a key driver to increased diversity, abundance and activity
of soil microbes, fungi and ecosystem engineers such as worms and ants, which facilitate
greater sequestration of soil organic carbon. Species rich grassland habitats also improve
soil structure and nutrient cycling; provide pollination services to nearby crops, wildflowers
and trees, purify water, mitigate against drought and flood events, increasing resilience to
the impact of climate change.   
Building adaptive capacity:
• As a member of Climate Ready Clyde, the Council has been involved in training on
adaptation skills and competencies, training on Climate justice and the new projections of
future flood disadvantage; and have access to an advisory board which is a virtual group of
practitioners, cities and adaptation experts to inform and challenge the City Region’s
approach to adaptation. 
• Flagship action 1 in the Climate Ready Clyde adaptation strategy is ‘Local authorities in the
region working together to build capabilities and deliver collaborative adaptation’. 
• The Council continues to raise awareness of Climate Ready Clyde’s Risk and Opportunity
Assessment and Climate Adaptation Strategy.
• The Council has started using Adaptation Scotland’s Benchmarking Tool.  The tool provides
a baseline assessment of current adaptation capabilities and how development progresses
over time.
• A PhD project is being jointly funded by the Council and Glasgow Caledonian University’s
Centre for Climate Justice. The study will focus on the climate vulnerability of South
Lanarkshire communities, capacity to transition to net-zero and building resilience in this
area. 
4(d) Where applicable, what contribution has the body made to helping deliver the
Programme? 
Local Development Plan 
The Local Development Plan 2 contains policies on protecting and enhancing priority greenspace
and green networks and ensuring the effect of development proposals on the natural environment
and flood risk is considered during the application process. The plan also contains policy to ensure
development proposals mitigate and adapt against climate change. The Planning Service works
closely with colleagues in Greenspace and Countryside to ensure habitats are not adversely affected
by new development. Masterplanning of the Council’s Community Growth Areas has incorporated
measures to enhance existing habitats. 
Managing Flood Risk
Local flood risk management plans (LFRMPS) were published in December 2022. South Lanarkshire
Council (SLC) was involved in the production of the Clyde and Loch Lomond and Tweed LFRMPs.
Through the process of developing these plans, a National Flood Risk Assessment identified the
areas at risk of coastal, pluvial and fluvial flooding, and objectives and actions were included in the
Plans for Responsible Authorities to undertake to improve the current situation. 
242

Page 243

The Council has been involved in the production and the ongoing updating of the Scottish Detailed
River Network (SDRN), and in complying with the duty under the Flood Risk Management (FRM)
Act. This dataset is used within the asset management database to assess and maintain
waterbodies. The Council also has access to the LiDAR (Light Detection and Ranging) dataset which
is regularly utilised during the catchment analysis stage in the production of Flood Studies. 
Local Transport Strategy
The Council continue to encourage active travel by extending the network of walking and cycle
routes. The next phase of the development of a segregated cycle network with enhanced pedestrian
facilities in East Kilbride has commenced. Cycle Route designs are being taken forward in various
locations such as Carstairs, Hamilton, Uddingston and Bothwell. 
The Council  work with SPT  and public transport operators to encourage the use of public transport.
Lanark Park & Ride facility opened this year and Hairmyres Park and Ride Site is being progressed. 
Biodiversity
South Lanarkshire Council have designated 17 Local Nature Reserves (LNRs) with  a broad
spectrum of habitats including ancient woodland, open water, wetlands, peatland and grassland. 
The Council continue to maintain and enhance the diversity of habitats creating wildflower meadows,
planting trees, enhancing existing wetlands and preserving our peatlands. Invasive non-
native species (INNS) including rhododendron, snowberry and Himalayan balsam continue to be
removed from the LNR areas. 
In partnership with Glasgow and Clyde Valley Green Network, the Council have been collating and
mapping data on priority species rich grasslands, wetlands and woodland in establishing our regional
Nature Networks, a key priority in the draft Scottish Biodiversity Strategy 2045: Tackling Nature
Emergency. As part of this over 100 Local Nature Conservation Sites (LNCS) have been identified
for the next Local Development Plan. 
The amount of intensively managed grassland throughout the area has been reduced with the aim
to improve habitats for pollinators. A pilot project in East Kilbride is underway in partnership with
local volunteers and Glasgow & Clyde Valley Green Network as part of their Clyde
Grasslands  project. At selected sites mowing and management regimes have been altered, and
species composition is monitored through survey work. 
The Council’s Biodiversity Officer works in partnership with the Peatland Officer at Glasgow and
Clyde Valley Green Network to determine the need for future management to restore and preserve
local peatland sites. 
In partnership with the Clyde Climate Forest, the Council have identified and continue to plant trees
in three ‘Target Neighbourhoods’ across the urban parts of South Lanarkshire which have low levels
of existing tree canopy cover and are particularly vulnerable to the impacts of climate change.
Approximately 23,700 trees have been planted in 2022-23 on council land, many with community
engagement. Working in partnership with the Clyde Climate Forest Community Volunteer
Coordinator, the Council is creating wider stakeholder groups for  tree and woodlands through
development of a Tree Warden scheme, promotion of the existing Young Tree Champions and Clyde
Climate Forest. 
Other Measures
Heat Energy Efficient Scotland: Area Based Scheme (HEES:ABS) programmes were developed to
install external wall insulation in privately owned and Council properties and are prioritised to target
fuel poor areas and households in most need of assistance. There are significant changes to the
way in which these programmes can now be delivered, with the introduction of PAS2035, market
supply of materials and the significant increase in costs. 
In the financial year 2023-24, 77 private properties, two private rented properties and 37 council
properties had external wall insulation applied. Eight private properties had new windows and doors
installed as a secondary measure, 37 council properties had new windows and doors installed. Four
243

Page 244

amenity units at one of the Travelling Persons Sites had new PV’s and battery storage installed. This
information was reported to the Scottish Government as part of the HEES:ABS Returns. 
Measures Owner
Occupied
Private
rented
Social
Landlord Total
External Wall Insulation (solid wall) 77 2 37 116
Window Glazing 8 0 37 45
High Performance External Doors with less
than or equal to 60% glazing area 8 0 37 45
Photovoltaics & Battery Storage 0 0 4 4
Total (ECO funded measures) 93 2 115 210 
The Council also facilitates the Local Authority Flexible Eligibility (LA Flex) Scheme. The Energy
Company Obligation (ECO) programme is funded from the large energy suppliers who provide
funding for the installation of energy efficiency measures to owner occupied homes across the UK
in order to reduce the country’s carbon emissions. Each local authority is required to complete and
submit their annual return to the Department for Business Energy & Industrial Strategy (BEIS). Last
financial year, under ECO 4, 163 homeowners have had 428 energy efficiency measures installed,
including for the first time, central heating, replacement of gas boilers and new heating controls, loft
and cavity wall insulation, underfloor insulation and internal wall insulation. 
Measures for ECO4 Flex period July 23 to 5 April 2024 Measures completed
Boiler - Upgrade to a non-renewable heating system  41
Boiler - Upgrade to a renewable heating system  89
Cavity wall insulation 22
ESH - Repair or replacement of a broken efficient ESH 1
ESH - Upgrade of an inefficient electric storage heater 11
External / Hybrid / Internal insulation of a solid wall 18
External / Hybrid / Internal wall insulation of a cavity wall 1
First time central heating  21
Flat roof insulation  4
Loft insulation where there is greater than 100mm pre-existing
insulation 2
Loft insulation where there is less than or equal to 100mm pre-existing
insulation 43
Pitched roof insulation 1
Programmer & room thermostat  32
Room-in-roof insulation insulated 6
Room-in-roof insulation uninsulated 3
Smart Thermostat 2
Solar PV  91
Time and temperature zone control 9
TRV's 20
Underfloor insulation  11
Total  428 
4(e) What arrangements does the body have in place to review current and future climate
risks? Provide details of arrangements to review current and future climate risks, for
example, what timescales are in place to review the climate change risk assessments referred
to in Question 4(a) and adaptation strategies, action plans, procedures and policies in
Question 4(b).
244

Page 245

The Sustainable Development and Climate Change Strategy (SDCCS) 2022-2027 includes the
Council's approach to managing climate change adaptation. The strategy includes current and future
climate risks and a 5 year action plan has been developed.  The SDCCS annual action plan is
reported bi-annually to the Climate Change and Sustainability Committee. 
The Council's top risks, which include risks on both climate change and adverse weather, are
reviewed annually. 
The Local Development Plan (LDP) was renewed in 2020.  Climate change mitigation and adaptation
are key themes throughout the LDP2. 
The Biodiversity Strategy 2024-2030 and Biodiversity Duty Implementation Plan (BDIP) were
launched in 2024. The Biodiversity Partnership group meet annually to monitor the progress of the
Biodiversity Strategy. The Biodiversity Duty Report 2024-2026 is requested by Scottish Government
every three years, this summarises the work achieved by the Council on biodiversity. The BDIP is
reviewed every three years. Action planning takes places on a rolling programme and kept under
continuous review.   
The Strategic Environmental Assessment (SEA) process is well embedded within the Council and
provides an opportunity to assess the risks and opportunities of climate change in new or revised
plans, policies and strategies. A full SEA was carried out alongside preparation of the Sustainable
Development and Climate Change Strategy. This has ensured a consistency in approach to
addressing the climate crisis alongside the ecological emergency. It ensures that the importance of
sustainable development is mainstreamed across the Council and promoted to communities and
partners. The climate adaptation strategy for the city region is also undergoing a full SEA. 
Local Flood Risk Management Plans (LFRMP) continue to be delivered. The monitoring of weather
patterns, including rainfall statistics, continues to be carried out to help inform how the Council
allocates resources and tracks the observed effects of climate change. Actions for the Council in the
LFRMPs include the production of four Flood Protection Studies and five Surface Water
Management Plans. The Council are currently working through a programme of delivering these
projects, and the effects of climate change upon future flood level, and the resultant impacts upon
building and infrastructure networks, will be considered in each of these projects. 
Climate Ready Clyde launched the first comprehensive risk and opportunity assessment for the
Glasgow City Region in October 2018. The findings and recommendations in the assessment
were used in the development of the first Adaptation Strategy and Action Plan for the Glasgow
City Region. The risk and opportunity assessment provides context for the Council’s risk
management approaches to climate change adaptation. 
4(f) What arrangements does the body have in place to monitor and evaluate the impact of
the adaptation actions?  Please provide details of monitoring and evaluation criteria and
adaptation indicators used to assess the effectiveness of actions detailed under Question 4c
and Question 4d. 
South Lanarkshire's State of the Environment Report provides data that facilitates the monitoring
and evaluation of a range of environmental issues - such as Biodiversity, Soil, and Water - where
climate change adaptation action has been undertaken. This also includes a specific chapter related
to climate change. 
The Council's performance management system IMPROVe is used to monitor and report actions
and measures within Resource Plans and the Sustainable Development and Climate Change
Strategy (SDCCS). The SDCCS includes adaptation actions such as biodiversity, greenspace and
flood risk management which are monitored and evaluated through IMPROVe and reported to the
Climate Change and Sustainability Committee biannually. 
SEPA prepared indicators that have been used in the first cycle of the LFRMPs, however these will
be reviewed and adapted to ensure they are reflective of the on-going changes within the cycles and
245

Page 246

as our understanding improves through the process. Several Surface Water Management Plans
(SWMP) and Flood Studies have been developed for the locations assessed with the highest Annual
Average Damages from surface water and river flooding. Any actions or recommendations identified
within the plans and studies will be evaluated regarding the reduction or mitigation of damages due
to flooding within these areas. 
The regional adaptation strategy and action plan, through Climate Ready Clyde, will be monitored
and evaluated. 
4(g) What are the body’s top 5 priorities for the year ahead in relation to climate change
adaptation?  Provide a summary of the areas and activities of focus for the year ahead. 
1. Develop a climate risk register upon which action planning, decision-making and monitoring
with regards to climate change adaptation and resilience will be built.
2. Continue as an active member of the Climate Ready Clyde Local Authority Forum
participating in city-region wide workshops and events, creating connections and
opportunities for development/co-sharing of knowledge and training by 2025.
3. Contribute to the development and implementation of local actions that contribute to the wider
Glasgow City Region's (GCR) Adaptation Strategy, where appropriate, working across
Council Resources.
4. Benchmark the Council against Adaptation Scotland’s Adaptation Capability Framework to
identify current position and areas for improvement.
5. Mainstream adaptation into governance practices and other key council plans and strategies. 
4(h) Supporting information and best practice, Provide any other relevant supporting
information and any examples of best practice by the body in relation to adaptation. 
South Lanarkshire Council is  a partner in Climate Ready Clyde which is a cross sector initiative
bringing partners together to work strategically to minimise risks and seize opportunities climate
change presents for the economy, society and environment across the Glasgow City Region. Its
aims are: 
• People and communities benefit from actions to adapt to climate change.
• Climate adaptation helps to secure existing investment and generates new opportunities.
• To protect the area’s natural environment and uses it to help adapt to climate change. 
Climate Ready Clyde has developed Glasgow City Region’s first Adaptation Strategy and Action
Plan. The Strategy aims to ensure Glasgow City Region’s economy, society and environment is not
only prepared for but continues to flourish in the face of current and future climate impacts. The 
Council develops and implements local actions that contribute to the wider Adaptation Strategy and
Action Plan. 
Part 5: Procurement 
5(a) How have procurement policies contributed to compliance with climate change duties?  
Provide information relating to how the procurement policies of the body have contributed to
its compliance with climate changes duties. 
The Council continues to consider environmental and social issues when purchasing goods and
services. The Council adheres to the Sustainable Procurement Duty to ensure that regulated
procurements: 
• Improve the economic, social and environmental wellbeing of the authority area, with a
particular focus on reducing inequality.
• Facilitate the involvement of small and medium enterprises, third sector bodies and
supported businesses.
• Promote innovation. 
246

Page 247

The Council also use the Scottish Government’s Sustainable Procurement Toolkit and performance
against the Flexible Framework is published in the Annual Procurement Report 2022-2023. Where
appropriate, tenders include full sustainability tests to ensure sustainable outcomes have been
embedded in the Invitation to Tender. A new sustainability process has been in place since
2022/2023, which mandates a new scoring approach in the technical envelope, with 30% of the total
technical score allocated to sustainability, including Fair Work First, Community Benefits and, for the
first time, a specific score for climate considerations. 
The Council has approved a new a five-year Procurement Strategy for 2023-2028 and one of the
seven key objectives is sustainable procurement, incorporating the climate change duties. 
In 2023/2024, the Council’s spend with local enterprises increased from 18% to 19.5%, representing
£67m spent in the South Lanarkshire area, with a further £41m spent with North Lanarkshire
enterprises. 
5(b) How has procurement activity contributed to compliance with climate change duties?  
Provide information relating to how procurement activity by the body has contributed to its
compliance with climate changes duties. 
The Council has confirmed it will contribute to the Scottish Government led research on driving
emission reduction through the public supply chain and will consider any new recommendations from
this research.   
In respect of procurement activity which has contributed to compliance with climate change duties,
the procurement team has supported the Council approaches to: 
• Expanding the use of electric fleet and the EV charging infrastructure
• Upgrade projects for social housing to achieve Energy Efficiency standards (EESSH)
• New construction arrangements for construction projects, including Larkhall Leisure Centre,
with embedded sustainability standards. 
5(c) Supporting information and best practice 
The output from the Sustainable Procurement tools can be accessed through the Council’s Annual
Procurement Report 2022-2023 
Part 6: Validation and declaration
6(a) Internal validation process   Briefly describe the body’s internal validation process, if
any, of the data or information contained within this report. 
The report was prepared by the Performance and Development Team with relevant Council
Resources. It has been reviewed by the Performance and Policy Development Manager, the Head
of Enterprise and Sustainability Development and approved by the Executive Director of Community
and Enterprise Resources. It has also been reviewed by the Executive Committee prior to
submission.   
Finance and Corporate Resources have previously carried out an internal audit of the climate change
duties report. The audit interrogated the data compilation and evidence pack and reported that the
methodologies and processes were robust and sound. The 2023-24 report has not been audited;
however, the same methodologies and processes have been applied as in previous years. 
6(b) Peer validation process. Briefly describe the body’s peer validation process, if any, of
the data or information contained within this report. 
When the internal audit was carried out, a benchmarking exercise took place comparing the level of
reporting detail within the South Lanarkshire report against six other local authorities in the Local
247

Page 248

Government Benchmarking Framework ‘family group’. Overall South Lanarkshire’s report compared
favourably with the other councils reviewed. 
6(c) External validation process. Briefly describe the body’s external validation process, if
any, of the data or information contained within this report. 
No external validation carried out at this time. 
6(d) No Validation process. If any information provided in the report has not been validated,
identify the information in question and explain why it has not been validated. 
Internal validation process as outlined in 6a. 
6 (e) - Declaration
I confirm that the information in this report is accurate and provides a fair representation of the body’s
performance in relation to climate change. 
Name Role in the body Date
David Booth Executive Director of Community
and Enterprise Resources 
04/10/2024 
248

Page 249

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Chief Executive  
Subject: Recommendations Referred by Resource Committees 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the following recommendations referred to this Committee:- 
 recommendation from the Education Resources Committee of 29 October
2024 that the Community Learning and Development 3-Year Strategic
Plan 2024 to 2027 be approved
 recommendations from the Finance and Corporate Resources Committee
of 30 October 2024 that the:- 
 Treasury Management Activity Report for 2023/2024 and the
2023/2024 Treasury Management and Prudential Code Indicators be
noted
 2023/2024 Annual Investment Report be endorsed and referred to
the Council for formal approval in line with The Local Government
Investments (Scotland) Regulations 2010
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community Learning and Development 3-Year Strategic Plan 2024 to
2027 be approved, as referred by the Education Resources Committee of 29
October 2024;
(2) that the Treasury Management Activity Report for 2023/2024 and the
2023/2024 Treasury Management and Prudential Code Indicators be noted,
as referred by the Finance and Corporate Resources Committee of 30
October 2024; and
(3) that the 2023/2024 Annual Investment Report be endorsed and referred to the
Council for formal approval, in line with The Local Government Investments
(Scotland) Regulations 2010, as referred by the Finance and Corporate
Resources Committee of 30 October 2024.
[1recs]
3. Recommendation Referred by Education Resources Committee of 29 October
2024 – Community Learning and Development (CLD) Strategic 3-Year Plan
2024 to 2027 – Extract of Minute 
3.1. A report dated 3 October 2024 by the Executive Director (Education Resources) was
submitted advising of progress made in the review and drafting of the Community
Learning and Development (CLD) Plan for 2024 to 2027.
12
249

Page 250

All local authorities had a statutory obligation to produce a 3-year CLD Plan as set
out in The Requirements for Community Learning and Development (Scotland)
Regulations 2013: Guidance for Local Authorities, the ‘CLD Regulations’. 
Key to the successful implementation of the 3-year CLD Plan (2024 to 2027),
attached as Appendix 1 to the report, would be to align identified need with current
good practice and the areas for improvement identified through ongoing review and
His Majesty’s Inspectorate of Education (HMIe) inspection processes. 
The Plan outlined the CLD Partnership’s commitment to the shared vision to
‘improve the quality of life for people of South Lanarkshire by offering vibrant learning
and development opportunities that lead to personal development and community
empowerment’ and to meet the challenges ahead. 
Information was provided on the following areas:- 
 the 12 priority outcomes agreed by the CLD Partnership
 a review of the governance arrangements
 mapping unmet need
 access to ESOL (English for Speakers of Other Languages)
 digital access
 workforce development
 consultation and strategic connections 
The Youth, Family and Community Learning Manager responded to members’
questions on various aspects of the report and, where information was not
immediately available, undertook to provide this to the relevant members 
The Committee decided: 
(1) that the CLD Strategic 3-year Plan 2024 to 2027, attached as Appendix 1 to the
report, be endorsed and referred to the Executive Committee for approval;
(2) that the actions and measures set out to secure improvement in the quality of life
for the people of South Lanarkshire be noted;
(3) that the revised governance arrangements for annual planning and reporting be
noted; and
(4) that the continued commitment to communities by South Lanarkshire and its
partners through the work of the South Lanarkshire Community Learning and
Development Partnership be noted. 
[Reference: Minutes of the Education Resources Committee of 8 February 2022
(Paragraph 13)] 
Councillor Marrs, having declared an interest in the above item of business, withdrew
from the meeting during its consideration 
3.2 A link to the report submitted to the Education Resources Committee of 29 October
2024 is provided for information.
Community Learning and Development (CLD) Strategic 3-Year Plan 2024 - 2027
250

Page 251

4. Recommendations Referred by Finance and Corporate Resources Committee
of 30 October 2024 – Prudential Indicators, Treasury Management Activity and
Annual Investment Report 2023/2024 – Extract of Minute 
4.1. A report dated 8 October 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on the:- 
 Treasury Management Activity and Prudential Code indicators for 2023/2024
 proposed Annual Investment Report for 2023/2024 
The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of
Practice for Treasury Management required the Council to prepare an annual report
on its Treasury Management activities.  The CIPFA Prudential Code required
councils to prepare a series of financial indicators that demonstrated affordability,
prudence and sustainability with regard to capital financing decisions. 
The Council’s Capital Programme included, within its funding package, planned
borrowing.  The Prudential Code provided a framework to assist the management of
the financial implications and helped to demonstrate that borrowing was both
affordable and prudent. 
The Council’s Treasury Management Activity Report for 2023/2024 and the Treasury
Management and Prudential Code Indicators for 2023/2024 were attached as
appendices 1 and 2, respectively, to the report. 
In terms of the Local Government Investments (Scotland) Regulations 2010, the
Council was required to prepare an Annual Investment Strategy prior to the start of
each financial year and an Annual Investment Report after the financial year end. 
Both documents required to be approved by the Council. 
The Annual Investment Strategy for 2023/2024 had covered the following areas:- 
 permitted investments
 risk management
 borrowing in advance 
The Annual Investment Report, attached as Appendix 3 to the report, detailed the
Council’s activity in each of those 3 areas for 2023/2024 and Appendix 4 detailed the
permitted investments that the Council had approved for the financial year
2023/2024. 
No borrowing in advance was taken during 2023/2024. 
The Committee decided: 
(1) that the Treasury Management Activity Report for 2023/2024 and the 2023/2024
Treasury Management and Prudential Code Indicators be noted and referred to
the Executive Committee for noting; and 
(2) that the 2023/2024 Annual Investment Report be endorsed and referred to the
Executive Committee for endorsement prior to submission to the Council for
formal approval in line with The Local Government Investments (Scotland)
Regulations 2010.
251

Page 252

4.2 A link to the report submitted to the Finance and Corporate Resources Committee of
30 October 2024 is provided for information.
Prudential Indicators, Treasury Management Activity and Annual Investment Report
2023/2024 
5. Employee Implications
5.1. All employee implications were highlighted as part of the original reports to the
Resource Committee. 
6. Financial Implications
6.1. All financial implications were highlighted as part of the original reports to the
Resource Committees. 
7. Climate Change, Sustainability and Environmental Implications
7.1. All climate change, sustainability and environmental implications were highlighted as
part of the original reports to the Resource Committees. 
8. Other Implications
8.1. Any risks or other implications were highlighted as part of the original reports to the
Resource Committees. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Equality impact assessment and consultation arrangements were highlighted as part
of the original reports to the Resource Committee. 
Paul Manning
Chief Executive 
30 October 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
♦ Education Resources Committee of 29 October 2024 (Paragraph 6)
♦ Finance and Corporate Resources Committee of 30 October 2024 (Paragraph 8)) 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel: 07385 370089
E-mail:  tracy.slater@southlanarkshire.gov.uk
252

Page 253

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Housing and Technical
Resources)  
Subject:  Fuel Poverty (Targets, Definition and Strategy)
(Scotland) Act 2019 – Report Consultation 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Executive Committee with the proposed response to the Scottish
Government consultation seeking responses to support the publication of the first
3-year periodic report on reducing fuel poverty rates
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the response in Appendix 2 is approved for submission to the Scottish
Government; and
(2) that agreement is provided for the response to be published as part of the
Scottish Government process.
[1recs]
3. Background
3.1. The Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019 (the Act)
sets ambitious, stretching targets for the significant reduction of fuel poverty rates by
2040 and established reporting requirements for publication of 3-year periodic
reports by the Scottish Government (SG).  The Act lists statutory consultee groups,
as well as listed organisations, including local authorities to formally engage as part
of this statutory process. The most relevant provisions of the 2019 Act are set out at
Appendix 1 for information. 
3.2. The first periodic report is due to be laid in the Scottish Parliament by the end of the
2024/2025 financial year, which will cover a consecutive 3-year period from
23 December 2021 as the publication date of the ‘Tackling fuel poverty in Scotland: a
strategic approach’, through to 22 December 2024. 
3.3. This will be a Scottish Government evidence-based report of progress on the steps
taken in the reporting period towards meeting our fuel poverty targets, including to
address the four drivers of fuel poverty (removing poor energy efficiency of the
home; low household income; high energy prices; how energy is used in the home). 
In addition, this will set out the steps in which Scottish Ministers propose to take in
the next reporting period – December 2024-2027 to meet the fuel poverty targets.  
13
253

Page 254

3.4. Information provided will also assist in building upon and developing new, existing
and planned actions in the next reporting period 2025-2027, with the subsequent
periodic report in Spring 2028. 
3.5. The activity to address fuel poverty spans three Resources. Housing and Technical
Resources lead on the development and delivery of the Local Housing Strategy and
the Local Heat and Energy Efficiency Strategy, where they have a co-ordinating role.
Tackling fuel poverty is built into the strategic priorities across these two strategies.
Finance and Corporate Resources lead a partnership Fuel Poverty group with the
Money Matters Advice Service providing direct financial support, energy vouchers
and a holistic triage service.  Social Work Resources lead the Child Poverty Local
Action Report Plan Group. 
3.6. The latest figures reported in the Scottish House Condition Survey (2017-2019)
shows that: - 
• 22% of households in South Lanarkshire are living in fuel poverty (2% below
the Scottish average of 24%); and 9% live in ‘extreme’ fuel poverty (3% below
the Scottish average of 12%).  
• 17% of families with children are living in fuel poverty, equivalent to the
Scottish average; and 4% are living in ‘extreme’ fuel poverty (1% below the
Scottish average of 5%).  
• 19% of pensioner/older households are living in fuel poverty which is 8%
below the Scottish average of 27%; and 9% are living in ‘extreme’ fuel poverty
(5% below the Scottish average of 14%).    
4. Views
4.1. The SG have invited views and feedback from a local authority’s perspective,
specifically as contained within the Act and set out at Appendix 1 to this report (Part
2 (a) and (b)). Questions authorities may wish to consider are outlined in Appendix 2.
The proposed responses detailed in Appendix 2 also address those listed in
Appendix 1, Part 2 (a) and (b). 
4.2. Responses were due by 8 November 2024; however, an extension has been granted
to 13 November 2024 to allow the draft responses to be presented to this meeting of
the Executive Committee. Individual responses will be considered for the final
periodic report, and it is proposed agreement is provided by the Executive
Committee for the response to be published as part of the SG process. 
4.4. The proposed response highlights the following:
• The Council recognises that the barriers and challenges for people heating
their homes include low incomes, poor financial resilience and poor energy
efficiency within properties.  In addition, South Lanarkshire’s significant rural
population presents further challenges with increased energy costs in these
areas.  
• Actions taken by the Council to improve energy efficiency within domestic
properties to date includes: 
o Investing approximately £78m since 2021 in its housing stock which
has led to improved energy efficiency rating of the Council housing
stock, as at March 2024, 95.4% of the Council’s housing stock are
compliant with Energy Efficiency Standards for Social Housing, up
from 93.88% in 2021.  
254

Page 255

o The publication of a Local Heat and Energy Efficiency Strategy
(LHESS) in July 2024 that aims to set out a long-term plan for
removing poor energy efficiency as a driver of fuel poverty. 
• Actions taken by the Council to increase household income centre on the
services provided by Money Matters Advice Service, generating £24.2m in
financial gains for residents in South Lanarkshire, supporting 12,694 unique
households and made 6,432 referrals for emergency energy vouchers. 
• The appointment of a dedicated energy advisor within the service has allowed
specific energy support to be provided to clients including access to a wide
range of providers of energy vouchers. 
• The work of the Community Planning Partnership in tackling fuel poverty
through co-ordinating partnership activity across a range of public, private and
third sector partners and promoting services and supports to householders
and communities. 
• It is not believed that any one council can influence the global markets for fuel
prices.
• It is estimated that 31,590 households in South Lanarkshire live in fuel poverty
however, the Council suggests improvements to how this is measured would
benefit opportunities to tackle it.
• The availability of funding for expensive measures such as external wall
insulation, heat pumps, heat networks, solar PV panels and battery storage
also presents a challenge to talking poor energy efficiency as a driver for fuel
poverty.
• The work with Home Energy Scotland to ensure that people have access to
advice about keeping warm at home and saving money on your energy bills.
• Further actions from the SG include encouraging the UK Government to
complete the review of electricity market arrangements (REMA) and decouple
the price of electricity from that of gas, thereby reducing electricity costs. In
addition, the SG could also apply pressure to the energy companies to provide
a ‘social housing tariff’ for the most vulnerable tenants who are struggling to
pay their energy bills at the current rates. 
• Assessing progress and the impact that the Council is making on Fuel Poverty
levels can be challenging. National statistics are available through the
Household Condition Survey; however, this data is only available at a Local
Authority level every few years, with the next available data due to be
published in 2025. More timely data at a Local Authority level is required. 
5. Employee Implications
5.1. The response has been prepared with input from the Money Matters Advice Service,
Property Services and Community Engagement Team. 
6. Financial Implications
6.1. None identified at present. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. There is a risk the SG’s fuel poverty targets are not met by 2040, and the action
being taken at a local and national level is only able to provide vulnerable
households with support to offset some of the impact of fuel costs. 
255

Page 256

9. Equality Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
23 October 2024 
Link(s) to Council Values/Priorities/Outcomes
• Accountable, effective, efficient and transparent
• Ambitious, self-aware and improving 
Previous References
• None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Craig Fergusson, Head of Finance (Transactions) 
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk 
256

Page 257

Appendix 1 
Extract from the Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019
specific to the legislative requirements on a periodic report
(information only) 
Part 1 
(a) the steps that have been taken during the reporting period for the purpose of meeting
the fuel poverty targets (including the costs of those steps), 
(b) the steps that have been taken in the reporting period to address the four drivers of fuel
poverty for the purpose of meeting the fuel poverty targets, 
(c) the progress made in the reporting period towards meeting the fuel poverty targets
(including what progress has been made in removing low levels of energy efficiency as a
driver of fuel poverty), 
(d) the steps that the Scottish Ministers propose to take in the next reporting period in order
to meet the fuel poverty targets (including any additional funding required to take those
steps), and
(e) the steps that the Scottish Ministers propose to take in the next reporting period to
address the four drivers of fuel poverty for the purpose of meeting the fuel poverty targets. 
Part 2 
A report under subsection (1) must also set out, with respect to meeting the 2040 target in
relation to each local authority area in Scotland— 
(a) the steps that have been taken during the reporting period for the purpose of meeting
that target, 
(b) the progress made in that period towards meeting that target, and 
(c) the steps that the Scottish Ministers propose to take or consider should be taken in the
next reporting period in order to meet that target 
257

Page 258

Appendix 2
Proposed Response 
1. What barriers or challenges might people in your local area currently face in terms of
being able to heat their homes according to their needs. 
Low income, poor financial resilience and a vulnerability to income shocks are major
factors that contribute to people being unable to heat their homes in South Lanarkshire.
This has been exacerbated in recent years by the volatile consumer energy price market,
which has seen household energy prices increase significantly. 
Deepening levels of poverty because of the significant increases in the cost of basic
essentials such as food and heat which disproportionately affect those on lower incomes. 
Many low-income individuals, families, struggling to get by and unable to meet their basic
needs and keep their homes warm, heat food due to rising energy prices.  A significant
challenge for residents being able to heat their homes is the high cost of energy. 
Availability of funding for retrofitting their homes to make them more energy efficient will
also be a barrier for residents to reduce their homes’ heat demand to make it easier and
cheaper to heat. 
South Lanarkshire has substantial rural areas, which are potentially at greater risk due to
the particular rural dimension for fuel poverty identified in the Scottish Rural Fuel Poverty
Task Force Action Plan Report in 2016. A key priority for housing investment
programmes and advice and support services will be to continue to identify and target
those rural housing areas and people who are likely to face higher risks of fuel poverty,
including off-gas grid homes and solid wall, non-traditional construction types. 
2. Local Authorities are delivery partners in many of the actions outlined in the Fuel Poverty
Strategy: “Tackling Fuel Poverty in Scotland”, for example via Area Based Schemes
delivery, and published Local Heat and Energy Efficiency Strategy (LHESS). Please
provide a broad outline of the actions that your local authority has undertaken since
December 2021 to: 
a) Improve energy efficiency in your area 
The Council has invested approximately £78m since 2021 in the domestic housing stock.
Investment in improving the energy efficiency of homes has undoubtedly mitigated
against the level of fuel poverty worsening, as acknowledged in the Report of the Scottish
Fuel Poverty Strategic Working Group (October 2016) however since then significant
challenges have arisen in the cost of energy used within homes. 
The council has and continues to actively direct its Housing Investment Programme and
utilise national funding including the Energy Efficient Scotland Area Based Scheme to
deliver a wide range of energy efficiency improvements within its’ housing stock, including
external wall insulation, installation of high-performance doors and double glazing. 
In June 2023, the council also set up arrangements to support delivery of the Energy
Company Obligation Scheme which continues to deliver a range of energy efficiency
measures across private homes in South Lanarkshire. 
258

Page 259

As a result of this investment, the average Standard Assessment Procedure (SAP) rating
for all homes with an Energy Performance Certificate in South Lanarkshire rose from 65.1
in 2021/22 to 67 in 2023/34. 
b) Increase local incomes in your area 
A partnership Living Wage Campaign Group brings together public sector and national
organisations and the business sector to promote payment of the Living Wage to
employers across Lanarkshire.  The council also supports the Living Wage Accreditation
Discount Scheme. 
A partnership Fuel Poverty Group brings together various public sector and national
organisations who promote the financial advice supports that are available.  The action
plan includes actions and measures aimed at maximising household income levels.  The
group has also produced a Tenant's Energy Guide and Advice for those worried about
energy costs and falling into debt. 
A partnership Local Child Poverty Action Plan Group brings together various public sector
and national organisations to address the drivers of Child Poverty.  Work focuses on
three main areas, income from employment, cost of living and income from social security
and benefits in kind. The latest report which provides and overview of progress to date
and includes cases studies, can be found here. 
Money is not the only problem
This is an online resource to assist individuals and families with accessing help, support
and guidance regarding finances and wellbeing including energy.  Booklets are also
available and are distributed to partners, communities, public buildings and at events. 
https://www.southlanarkshire.gov.uk/info/200134/benefits_and_money_advice/2050/mon
ey_is_not_the_only_problem 
South Lanarkshire Council has primarily tried to address fuel poverty drivers through the
provision of support from its in-house money and welfare rights service. In 2023-24, the
Money Matters Advice Service generated £24.2m in financial gains for residents in South
Lanarkshire, supporting 12,694 unique households and made 6,432 referrals for
emergency energy vouchers. 
A triage service deals with food and fuel emergencies when people present with these.
This is primarily achieved by working with food banks and fuel vouchers providers, but
also by the investment by South Lanarkshire Council in the creation of a Cash First
Scheme that sees 97% of people who are successful receiving same day financial
support with a £50 payment. 
This scheme has built on previous schemes that included a Financial Wellbeing Support
Fund that invested £1.6m in financially supporting approximately 6,000 households as
they received advice with payments of £250 and also an Energy Top Up Voucher
Scheme in partnership with the Wise Group that distributed over 10,000 energy top up
vouchers to residents in South Lanarkshire. 
259

Page 260

c) Reduce energy costs in your area 
A partnership Fuel Poverty Group brings together various public sector and national
organisations who promote the financial advice supports that are available.  The action
plan includes actions and measures aimed at reducing energy costs.  The group has also
produced a Tenant's Energy Guide. 
d) Support people to heat their homes efficiently in your area (behaviour) 
As above, a partnership Fuel Poverty Group brings together various public sector and
national organisations who promote the financial advice supports that are available.  The
action plan includes actions and measures aimed at providing energy saving information
and advice.  The group has also produced a Tenant's Energy Guide. 
Over 6,432 people received basic energy advice and support and 444 people received
specialist level energy advice and support, as our Money Matters Advice Service has
employed an energy adviser and is seeking to source funding for another. 
3. In your opinion have actions undertaken by your local authority since 2021 (for example,
Area Based Scheme delivery, published Local Heat and Energy Efficiency Strategy,
published Local Housing Strategy) either helped to improve fuel poverty OR helped to
alleviate the impacts of fuel poverty on people in your local area in Scotland? Why or why
not? Please explain your answer. 
Yes. 
The range of support provided by the Money Matters Advice Service both financial and
advisory has provided a level of mitigation for households to counter some of the worst
effects of the significant increase in energy costs. Any important element of support is the
provision of a benefit check. The award of new and sometimes backdated benefits can
result in clients’ financial circumstances changing significantly and this can help with
meeting higher energy costs. 
The appointment of a dedicated energy advisor within the service has allowed specific
energy support to be provided to clients including access to a wide range of providers of
energy vouchers. 
Since 2020/21 the percentage of South Lanarkshire Council’s housing stock meeting
Energy Performance Certificate Bands A to C has increased from 90.95% to 92.62%
while over the same period the average Standard Assessment Procedure rating for
housing stock has risen from 73.82 to 74.46. This suggests that the significant investment
led by the council is improving the energy efficiency of homes across South Lanarkshire. 
The main priority for the council’s new LHEES is to reduce heat demand using a fabric
first approach to improve the condition and energy efficiency of housing across all
tenures to ensure that poor energy performance is removed as a driver of fuel poverty. As
the strategy moves to a delivery phase, a key focus will be to help to alleviate the impacts
of fuel poverty on people in South Lanarkshire. 
In a national context, South Lanarkshire is the tenth most deprived area out of 32 local
authorities, based on the SIMD analysis carried out. A total of 31,590 properties in South
Lanarkshire fall within SIMD deciles one and two. Just under half of the total properties
260

Page 261

owned by the Council fall into this category. This illustrates a strong link between the
social housing tenure type and areas with high SIMD scores. With a priority of alleviating
fuel poverty, South Lanarkshire Council has used the LHEES process to investigate
areas of high probability of multiple deprivation in conjunction with category one
properties. 
4. In your opinion have actions undertaken by your local authority since 2021 helped reduce
the impact of the following driver on fuel poverty in Scotland? 
a) Poor energy efficiency? 
Yes, as can been seen in the RdSAP and EPC metrics highlighted in question 3 above.
As at March 2024, 95.4% of the Council’s housing stock are compliant with EESSH, up
from 93.88% in 2021. 
b) High fuel prices? 
No, it is not believed that any one council can influence the global markets for fuel prices. 
c) Low income? 
During 2023/24 the council’s Money Matters Advice Service assisted 12,692 unique
clients across South Lanarkshire and brought £24.2 million in financial gains for
residents. 
The council operated a Financial Wellbeing Support Fund that invested £1.6m in
financially supporting approximately 6,000 households as they received advice with
payments of £250 and also an Energy Top Up Voucher Scheme in partnership with the
Wise Group that distributed over 10,000 energy top up vouchers to residents in South
Lanarkshire. 
Overall, 79% of Money Matters clients live in data zones that are classified as being in
the lower half of all SIMD data zones, showing that the service is successfully reaching
clients that are in the most deprived areas of South Lanarkshire. 
Over 6,432 people received basic energy advice and support and 444 people received
specialist level advice and support. 
Money Matter Advice Service Financial Gains:
• 2021-22 - £18.8m
• 2022-23 - £27.6m
• 2023- 24 - £24.2m 
d) Inefficient use of heat in the home (household behaviour)? 
The council’s Money Matters Advice Service works closely with Home Energy Scotland to
ensure that people have access to advice about keeping warm at home and saving
money on your energy bills. Energy advice, including energy saving advice has been
provided by Money Matter Advice Service through the dedicated Energy Advisor. 
261

Page 262

Significant efforts have also taken place to support the council’s 25,000 tenancies in
reducing inefficiencies within their homes. This includes energy advice and support
information published in regular newsletters and sent to all households, as well as
supporting tenants with the transition to net-zero systems with the provision of ‘how to
guides’ to make the most of their new system. 
5. What, if anything, has made delivery towards tackling fuel poverty challenging in your
local area? 
The scale of the issue has made the efforts to tackle fuel poverty challenging: 31,590
households in South Lanarkshire live in fuel poverty.  In terms of the council’s land area
and population distribution: 75% of the land is rural and is inhabited by 25% of the
population; 25% of the land is urban with 75% of the population living in these areas.  It is
estimated that one in every five properties in South Lanarkshire is off the gas grid and will
pay more in energy costs (source: non-gas map).   In addition, the uncertainties around
the level of fuel poverty add to the challenge with no accurate national or local data sets
available. 
Limited timescales for delivery and an underdeveloped supply chain for energy efficiency
measures has presented significant challenges in maximising the impact of funding made
available through the Energy Efficient Scotland Area Based Schemes. Owner
contributions within mixed tenure buildings also add to the complexities within these
projects resulting in many not being progressed despite an identified need for them to do
so. Additional flexibilities for the council in utilising this type of funding to target fuel
poverty would be beneficial. 
Improving customer awareness of how to maximise the benefits of any energy
improvements made to properties is also a challenge. 
The availability of funding for expensive measures such as external walI insultation, heat
pumps, heat networks, solar PV panels and battery storage also presents a challenge to
talking poor energy efficiency as a driver for fuel poverty. 
A further challenge we have is about how fuel poverty is measured: (1) it is largely
dependent on the income of the household and therefore very fluid and, (2) there is no
real accurate way of measuring it. For example, we could complete a survey to see who
is in fuel poverty, then target investment at their property to improve energy efficiency
with the aim of reducing their bills and lifting them out of fuel poverty. In the time it takes
us to upgrade the property the tenant has moved to a different property with lower energy
efficiency ratings and remains in fuel poverty. The only solution is to aim to bring all stock
up to higher standard which is increasingly difficult to do given the standards themselves
keep changing and the council stock keeps getting older.     
To date, there has not been a comprehensive dataset detailing fuel poverty given the
resources required to do so and the risk of identifying individuals and communities
through the use of sensitive information such as income data. The fuel poverty data in the
Home Analytics dataset is therefore probability driven and figures are not an absolute
number or percentage but rather a likelihood of fuel poverty. An instance where fuel
poverty data lacks confidence and leads to a poor representation of the geographical
area is in households in affluent areas who may be labelled as in fuel poverty because
they live in stone buildings with poor heating capture. 
262

Page 263

6. What further action do feel is required from the Scottish Government for the purposes of
reducing/ mitigating fuel poverty for vulnerable households in Scotland? 
Ensure that the transition to net zero is just and does not increase fuel poverty by
introducing more costly alternatives, for example a move from gas to electric.  More cost
effective green alternatives which focus on decreasing fuel poverty levels for those on low
incomes, could be explored.  Consideration could be given to better targeted and fairer
allocation of fuel payments that include families experiencing ‘in work’ poverty.   
Further investment in renewable energy projects which are owned and operated by local
communities however with the appropriate support networks to build community capacity. 
Continue to challenge the injustices of the energy sector in providing affordable energy
(UN SDG 7).   
Given that the social, economic and health determinants of poverty reach far wider than
those set out in this policy, consideration could be given to aligning this legislation to
existing legislation and policy, for example relating to Child Poverty Action, Employability,
Housing, etc.   
Consider additional incentives and financial supports for households that are off grid to
support them to reduce energy costs and phase out fossil fuels.   
The Scottish Government could implement multi-year funding for the Energy Efficient
Scotland: Area Based Schemes to give future certainty to allow local authorities to plan
strategic retrofit investment programmes. The Government could also expand the options
of financial products available to private landlords and owner occupiers through the Home
Energy Scotland service. 
The Scottish Government could encourage the UK Government to complete the review of
electricity market arrangements (REMA) and decouple the price of electricity from that of
gas, thereby reducing electricity costs. 
The Scottish Government could also apply pressure to the energy companies to provide
a ‘social housing tariff’ for the most vulnerable tenants who are struggling to pay their
energy bills at the current rates. 
The Government could also renew investment in the Fuel Insecurity Fund. 
Assessing progress and the impact that the council is making on Fuel Poverty levels can
be challenging. National statistics are available through the Household Condition Survey;
however, this data is only available at a Local Authority level every few years, with the
next available data due to be published in 2025. More timely data at a Local Authority
level is required. 
263

Page 264

264

Page 265

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Response to Consultation on Proposal to Allow Proxy
Voting by Councillors 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of a consultation by the Scottish Government on a proposal
to allow proxy voting by councillors
 seek approval to a proposed response by the Council to the consultation
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of the report be noted; and
(2) that the submission of the response by the Council to the consultation, as
included in Appendix 1 to this report, be approved.
[1recs]
3. Background
3.1. On 3 October 2024, the Scottish Government opened a consultation on a proposal to
allow proxy voting by councillors. 
3.2. The consultation closes on 28 November 2024. 
3.3. The consultation paper advises that concerns have been raised with the Scottish
Government around the absence of proxy voting provision for councillors.  The
consultation notes that the absence of explicit provisions allowing for proxy voting
within local authorities could impact councillors on parental leave, or those who are
unable to attend for other reasons, for example, because of an accident or serious
illness.  Proxy voting in these circumstances would allow a councillor to nominate
another specified councillor to vote on their behalf during Council decisions. 
3.4. The relevant legislative framework allows for formal local authority meetings (including
committees, joint committees and sub-committees) to be conducted in any way in
which each member is enabled to participate, even if not physically present.  However,
there are no provisions which explicitly allow for proxy voting, and the consultation
seeks views on introducing a provision to permit proxy voting within local authorities.  
14
265

Page 266

3.5. The consultation notes that there may be options, short of proxy voting, that could aid
decision making.  The Scottish Government notes that local authorities could introduce
informal pairing agreements along the lines of those previously used in the Scottish
Parliament prior to its introduction of explicit proxy voting provisions.  Pairing occurs
where two individuals from opposing parties both agree not to vote on a decision.  In
local government, this would allow a councillor to be absent without affecting the result
of the vote as the absences balance each other out. 
3.6. The Scottish Government does, however, recognise that there could be difficulties
around this given councils are smaller, with more limited numbers of councillors to
pair.  There may also be instances where local circumstances mean it would not be
possible to agree a pair.  Such a pairing agreement might also prevent quorum
requirements being met, particularly in smaller authorities. 
3.7. The consultation notes that local authorities could also consider the appointment of
named substitutes to committees, effectively allowing a form of proxy voting to be
used.  Clearly, this is an approach the Council already adopts, and it is understood
most Scottish local authorities do.  The consultation does, however, note that where
there are independent members or a smaller number of councillors from the same
party then opportunities for named substitutes may be limited.  It would also not be
possible to apply this to full Council meetings as all councillors are entitled to attend
those meetings. 
3.8. Given the above limitations to these options, the Scottish Government believes that a
statutory provision around proxy voting would be preferable. 
4. Proposal
4.1. The Scottish Government proposes to amend the Local Government (Scotland) Act
1973 to enable a councillor in Scotland to arrange for their vote to be cast by a proxy. 
A further amendment would also be made which would require local authorities to
agree and publish a scheme setting out how proxy voting would work in practice,
where they choose to introduce proxy voting. 
4.2. The Scottish Government advise that the operational details, including the criteria of
the scheme, would not be set out in legislation.  It would be for local authorities to
determine how a scheme could work in practice and under which circumstances proxy
voting could be available, should they wish to allow for it.  Joint guidance would be
produced by COSLA and the Scottish Government to assist the drafting of the
operational scheme. 
4.3.  The Scottish Government proposes the following criteria be included within the
operational guidance as suggestions on where proxy voting could be appropriate:- 
 maternity leave, paternity leave, parental leave, shared parental leave or
adoption leave
 complications arising from pregnancy, childbirth, miscarriage or baby loss
 serious long-term illness or injury
 bereavement
 attending to a person who is near the end of their life
 any other reason subject to agreement of the full Council  
266

Page 267

4.4.  The Scottish Government has, however, advised that, at this time, there is no suitable
legislative opportunity to introduce this amendment should the consultation support
the introduction of proxy voting.  The Scottish Government will continue to support
authorities to investigate other options to enable councillor participation until such time
an amendment can be introduced. 
4.5. Officers have assessed the proposal.  Broadly speaking, officers can see benefit in
permitting local authorities the ability to introduce some form of proxy voting, in such
form as an individual local authority considers appropriate.  Officers have drafted a
proposed consultation response, included in Appendix 1 to this report.  As included in
the draft response, there are a few comments that it is suggested are worth noting in
the response:- 
 it is understood that most local authorities already have arrangements for
substitutions, so in practical terms this is most likely only to be relevant for
meetings of the full Council, or where a member cannot arrange a substitute
 it is commonly accepted that in the exercise of a proxy vote, the person entitled
to vote (Cllr A) instructs their proxy (Cllr B) to exercise their vote in accordance
with their wishes (ie Cllr A’s wishes).  Quasi-judicial matters cannot be pre-
determined and there is a clear requirement for elected members to only make a
decision once all relevant considerations have been suitably considered.  It is
difficult to see how this could be reconciled with a member arranging for a proxy
to vote on their behalf in a particular way.  If this is how the Government intends
the proposal to operate, and the proxy does not have discretion as to how they
vote, then it is recommended that proxy votes are not permitted for quasi-judicial
matters
 linked to the above, whilst some local authorities require certain motions and
amendments to be tabled in advance of the meeting, this is not the case for all,
and even then, there will still be the ability to move proposals at the meeting itself. 
If an elected member is not able to participate in the meeting, then they will not
have heard the full discussion and debate and, as such, might not be able to fully
take all relevant considerations into account before they vote.  They will neither
be able to ask questions or contribute to the discussion/debate themselves as
they might otherwise have done had they been able to participate.  In this context,
relevant considerations could include the application of the Public Sector Equality
Duty and the Fairer Scotland Duty to the matter in question.  Decisions of the
Council are at risk of legal challenge if there is a flaw in the decision-making
process, for instance because a relevant duty was not suitably discharged.  As
above, if this is how the Government intends the proposal to operate, then it is
recommended that consideration is given to proxy votes not being permitted for
matters where councillors need to be able to participate in the meeting
 if someone arranges for a proxy to vote on their behalf this presumably would not
be counted as attendance at the meeting, in terms of Section 35 of the Local
Government (Scotland) Act 1973
 a member who would otherwise have been unable to vote on the matter in
question should not be able to have a proxy vote on their behalf, e.g. where they
are currently in a period of suspension following a decision of the Standards
Commission or where they would have declared an interest and recused
themselves from the meeting
 a member who has arranged for a proxy to vote on their behalf should not count
towards a quorum at the meeting  
267

Page 268

 whilst it would no doubt be for each authority to consider their own local rules,
any proxy arrangements would need to be advised to relevant Council officials
by a suitable time in advance of the meeting commencing
 Councils now use a variety of electronic meeting systems, some with voting
options, and individual Councils would need to ensure their system could
accommodate a proxy vote 
5. Employee Implications
5.1. There are no employee implications arising directly from this report. 
6. Financial Implications
6.1. There are no financial implications arising directly from this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications arising
directly from this report. 
8. Other Implications
8.1. There are no other implications arising directly from this report. 
9. Equality Impact Assessment and Consultation Requirements
9.1. There is no requirement for an equality impact assessment in respect of this report.
There is neither a requirement for the Council to undertake a consultation in respect
of this proposal from the Scottish Government. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
14 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Strachan, Head of Administration and Legal Services
Ext:  4516  (Tel: 01698 454658)
E-mail:  iain.strachan@southlanarkshire.gov.uk 
268

Page 269

APPENDIX 1 
Consultation on proposal to Allow Proxy Voting by Councillors 
Consultation Questions 
Question 1
Do you agree that an explicit provision should be introduced to allow a councillor to
arrange for their vote to be cast by proxy 
(YES/NO) Proposed Response: Yes 
Question 2
Do you agree with the optional criteria set out at paragraph 12 which could be
applied by a local authority to allow for proxy voting? 
(YES/NO) Proposed Response: Yes 
Question 3
Are there any further comments that you wish to make on the proposal to allow for
proxy voting (free text, 300 word maximum)?
In general terms, the Council is supportive of the additional flexibility that proxy voting might
permit. Clearly, how such an arrangement might operate in any individual council would be
for them to determine, and would need to take account of its size, political composition and
meeting arrangements (including any electronic meeting/voting systems adopted).
However, the Council believes the following points are also worthy of consideration:-
• It is understood that most local authorities already have arrangements for
substitutions, so in practical terms this is most likely only to be relevant for
meetings of the full Council, or where a member cannot arrange a substitute;
• It is commonly accepted that in the exercise of a proxy vote, the person
entitled to vote instructs their proxy to exercise their vote in accordance with
their wishes. Quasi-judicial matters cannot be pre-determined and there is a
clear requirement for a councillor to only make a decision once all relevant
considerations have been suitably considered. It is difficult to see how this
could be reconciled with a member arranging for a proxy to vote on their
behalf in a particular way. If this is how it is envisaged proxy voting would
operate, then it is recommended that proxy votes are not permitted for quasi-
judicial matters;
• Linked to the above, whilst some local authorities require certain motions and
amendments to be tabled in advance of the meeting, this is not the case for
all, and even then there will still be the ability to move proposals at the
meeting itself. If an elected member is not able to participate in the meeting,
then they will not have heard the full discussion and debate and, as such,
might not be able to fully take all relevant considerations into account before
they vote. They will neither be able to ask questions or contribute to the
discussion/debate themselves as they might otherwise have done had they
been able to participate. In this context, relevant considerations could include
the application of the Public Sector Equality Duty and the Fairer Scotland Duty
to the matter in question. Decisions of the Council are at risk of legal
challenge if there is a flaw in the decision-making process, for instance
because a relevant duty was not suitably discharged. As above, if this is how
the Government intends the proposal to operate, then it is recommended that
consideration is given to proxy votes not being permitted for matters where
councillors need to be able to participate in the meeting; 
269

Page 270

• If someone arranges for a proxy to vote on their behalf this presumably would
not be counted as attendance at the meeting, in terms of Section 35 of the
Local Government (Scotland) Act 1973;
• A member who would otherwise have been unable to vote on the matter in
question should not be able to have a proxy vote on their behalf, e.g. where
they are currently in a period of suspension following a decision of the
Standards Commission or where they would have declared an interest and
recused themselves from the meeting;
• A member who has arranged for a proxy to vote on their behalf should not
count towards a quorum at the meeting. 
270

Page 271

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Director, Health and Social Care
Executive Director (Education Resources)  
Subject: South Lanarkshire’s Children’s Services Plan 2023-2026
- Annual Report of Progress for 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Committee on the work to ensure South Lanarkshire’s Children’s
Services Plan (CSP) remains in line with Scottish Government guidance and is
helping to contribute towards best possible outcomes for children, young people
and families 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendations:-
]
(1) that the content of the CSP annual progress report for the period 2023/2024 be
noted. 
3. Background
3.1. The Children and Young People (Scotland) Act 2014 introduced requirements for
each local authority and linked health board to prepare and publish the following:-  
(a) a Children’s Services Plan (CSP) covering the period April 2017– March 2020
(and then in a continuing three-year cycle); and
(b) a Children’s Rights Report by March 2020 (and then in a continuing three-year
cycle). 
3.2. The duty to publish a Children’s Rights Report every three years has become a
statutory duty as a result of the United Nations Convention on the Rights of the Child
(UNCRC) (Incorporation) (Scotland) Act 2024. 
3.3. The annual reporting model has, for a number of years, incorporated a section on the
work to deliver on children’s rights. This is in addition to the (now statutory) duty to
produce a Children’s Rights Report on a three-year cycle.  The report for 2023/2024
continues this approach. 
3.4. The annual progress report for 2023/2024 was endorsed by the Getting It Right for
South Lanarkshire’s Children Strategy Group in July this year and by the Corporate
Management Team in October. 
15
271

Page 272

4. Progress Update 
4.1. The Annual Report for 2023/2024 is attached as Appendix 1 and contains a summary
of the key activity of the Children’s Services Partnership covering the first year of the
current Plan. 
4.2. The content of the report is informed by the work of three thematic groups (Whole
Family Approach, Health and Wellbeing and Keeping the Promise) reflecting relevant
data gathered, the experiences of children, young people and families and the analysis
of partners leading and delivering this work. 
4.3. The report style reflects the refreshed branding of the Children’s Services Plan and
also incorporates graphics linked to the national Promise Plan 2024-2030. 
4.4. The tables below show the high-level outcomes and priorities driving the work of the
Children’s Services Plan. 
Every family that needs support gets the right family support at the right time for as long as it is
needed 
Reduce the number of children and young people living away from their families 
Reduce the number of families requiring crisis intervention
Reduce the inequality gap in child development 
Reduce the inequality gap in wellbeing outcomes for families’ children and young people 
Increase the number of families taking up wider supports 
Children and young people grow up loved, safe, respected and listened to 
Put voice at the heart of all decision-making processes at all levels
Increase the number of care experienced people accessing further and/or higher education opportunities
and successful employment
Reduce poverty amongst care experienced people
Improve lifelong support for care experienced people
Improve support into long term housing for care experienced people
Improve the mental health and emotional wellbeing of care experienced people 
Every child and young person will be able to access support which helps improve their mental
health and emotional wellbeing
Improve maternal and infant mental health 
Improve support offered to children and young people who may be at risk of suicide and self-harm
Improve whole school approaches to mental health and wellbeing 
Improve visibility and accessibility of community mental health supports and services 
Develop staff professional learning and development to ensure their own and others’ wellbeing is
established  
272

Page 273

4.7. The Children’s Services Partnership carried out a reflection process at the end of 2022
to ensure that its governance structure going forward is fit for purpose and reflects the
main policy areas informing services for children, young people and families. The
outcome of that process can be seen in the structure diagram on page 29 of the Annual
Report. 
4.9. The content of the Plan is organised around the three thematic groups. The groups
implement and monitor action plans which combined provide oversite of progress in a
performance framework. This framework is being updated for 2024/2025 based on
experience of delivering on priorities in year one of the Plan. 
4.10. A report on the quality of the Plan has been received from the Scottish Government
and is attached as Appendix 2. The report provides reassurance that the Plan is ‘high
quality’ and is fit for the purpose of improving outcomes for children, young people and
families. 
5. Next Steps
5.1. The Annual Report will be published and submitted to the Scottish Government as per
statutory duty and cascaded across the South Lanarkshire partner organisations. 
5.2. The performance framework will continue to support the implementation, monitoring
and reporting of progress against each of the agreed priorities. Each of the thematic
groups will take responsibility for maintaining their contribution to the framework and
in ensuring appropriate performance evidence is collected to support future reporting
demands. 
6. Employee Implications
6.1. There are no employee implications associated with this report. 
7. Financial Implications
7.1. There are no financial implications associated with this report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. There are no issues in terms of risk associated with this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. In developing the new Children’s services Plan, a combined Equality Impact
Assessment and Children’s Rights Wellbeing Impact Assessment was produced. 
11. Children’s Rights Considerations
11.1. A Children’s Rights Wellbeing Impact Assessment has been completed as part of the
work to build the plan. 
273

Page 274

11.2.  The work to support the participation of children, young people and families in
implementing the priorities of the plan is central to our commitment to the UNCRC and
in particular the following Articles: 
 Article 12 (respect for the views of the child) Every child has the right to
express their views, feelings and wishes in all matters affecting them, and to have
their views considered and taken seriously. This right applies at all times, for
example during immigration proceedings, housing decisions or the child’s day-
to-day home life. 
 Article 13 (freedom of expression) Every child must be free to express their
thoughts and opinions and to access all kinds of information, as long as it is within
the law. 
Professor Soumen Sengupta
Director, Health and Social Care 
Carole McKenzie
Executive Director, Education Resources 
9 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Education and learning: inspiring learners, transforming learning, strengthening
partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would further information, please contact:- 
Kevin Mullarkey, Children’s Services Partnership Planning Manager, South Lanarkshire
Council
Tel: 07795453122 
Email: kevin.mullarkey@southlanarkshire.gov.uk 
274

Page 275

Working together: 
making a difference
Annual Progress Report
2023—2024
for South Lanarkshire’s
Children’s
Services Plan
SLC 
print proof
Appendix 1
15
275

Page 276

2
Children’s Services Plan
2023—2024
Children, young people and families will be
safeguarded and supported to reach their full
potential and thrive within their communities.
SLC 
print proof
276

Page 277

Contents
3
Section one:  Foreword  4
Section two:  Our Vision  6
Section three:  Children’s Rights in South Lanarkshire  7
Section four:  Our plan and its progress 11  
• Embedding Whole Family Support 11
• Improving the health and wellbeing of 
children, young people and their families  16
• Keeping the Promise to our 
care experienced children, 
young people and families  21
Section five: Our commitment to improvement  27
Section six:  Moving Forward  28
Section seven:  Wider Partnerships 29
SLC 
print proof
277

Page 278

Section one:
Foreword
Welcome to the first annual report of South Lanarkshire’s Children’s Services
Plan 2023-2026. The principle of ‘Working Together: Making a Difference’ is at
the centre of our children’s service partnership and how we work together to
support the best outcomes for our children, young people and families.
Our plan has been closely aligned with South
Lanarkshire’s Child Poverty Commitment and Local
Child Poverty Action Report. This helps to provide a
valuable contribution towards South Lanarkshire’s
Community Planning Partnership aim of tackling
deprivation, poverty and inequality and the
continued challenge of reducing child poverty.
This report will focus on the nineteen priority
outcomes of our plan and the improvement work we
put in place to help achieve these outcomes. Over
the life of the plan, this focus on improvement has
informed our work and our aspirations to achieve the
best possible outcomes for our children, young people
and families.
Commitment to Keeping the Promise is now second
nature in our work, building on the findings of the
Independent Care Review and informed by the voice
of our children and young people through robust
participation processes. Our commitment to support
our care experienced children, young people and
families is reflected in the role of the Promise Board and
the children and young people led Champions Board.
Together these two groups drive the relationship
that will support real change, ensuring that South
Lanarkshire’s children and young people grow up
loved, safe and respected.
As we highlight the activity undertaken over the last
year, we also look to the future and map out the
direction we are taking going forward across this
planning cycle. We have restructured our governance
arrangements to ensure that we are closely linked to
the national policy agenda, are making the most of
available funding streams and are maximising investing
a proportionate amount of time into the key planning,
evaluation and scrutiny required to help us deliver the
changes we aspire for our children and young people.
As a partnership, we implement an improvement
approach to the activity contained within the plan.
This additionality has been a feature of how we work
together to offer the best possible support to families
and to help us collectively achieve our shared vision of
ensuring that:
South Lanarkshire’s children, young people and
families will be safeguarded and supported to reach
their full potential and thrive within their communities.
Our report reflects the agreed priorities in our plan
and what we still need to do to further improve the
life chances of our children, young people and families.
Our priorities are grouped around the outcomes of:
T Embedding Whole Family Support
T Improving the health and wellbeing of children,
young people and their families, and
T Keeping the Promise to our care experienced
children, young people and families
4
Children’s Services Plan
2023—2024
SLC 
print proof
278

Page 279

Paul Manning
Chief Executive, 
South Lanarkshire 
Council
Professor 
Jann Gardner
Chief Executive, 
NHS Lanarkshire
We are committed to the challenge contained in the
UNCRC (Incorporation) (Scotland) Act 2024 and to
making children’s rights real in our work. We recognise
the vital role public services play in delivering
improved outcomes for children, young people and
their communities and that the full realisation of
children’s rights requires proactivity on our part, to
which we are committed. One way we do this is to
ensure the voices of our children and young people
are being heard and acted upon by the partnership.
This approach is embedded in our three thematic
groups, and we have meaningful participation of
children, young people and families at the heart of
the co-design of services.
This report details how we have worked together to
improve outcomes for children, young people and
their families in South Lanarkshire and built a strong
foundation for delivering on our agreed priorities.
While we look to the future to ensure we are making
the most of the resources available to us and the
capacity to achieve our shared vision, we reflect on
the achievements over the last year and learn from
what has worked well and where we can do better.
5
SLC 
print proof
279

Page 280

Section two:
Our Vision
6
Children’s Services Plan
2023—2024
South Lanarkshire’s
children, young people
and families will be
safeguarded and
supported to reach
their full potential 
and thrive within 
their communities.
SLC 
print proof
280

Page 281

Section three:
Children’s Rights in South Lanarkshire
Respecting and promoting the rights of all children
and young people is central to our work and we are
confident that this strong rights-based approach
is making a significant difference to children and
young people’s lives. We are listening to the voices of
more young people than ever before, which in turn is
informing our work together.
As a partnership we have developed a strategic
approach to how the voices and lived experience 
of children, young people and parents and carers 
can be incorporated into our planning processes 
more effectively.
We recognise that children and young people want
the right to be themselves and this is a feature of 
our approach. #TheRightToBeMyself
Our commitment to children’s rights and engagement
participation is a strength and features in our
children’s services plan animation, designed and
created by our children and young people: 
https://youtu.be/fS-fdwNfg0o
Our commitment to children’s rights
We have been busy preparing for the incorporation of the United Nations
Convention on the Rights of the Child (UNCRC) into domestic law. Our
approach is designed to help children access their rights more easily and
we have been engaging with our wider workforce to help them understand
children’s rights better, be more aware of the demands that incorporation will
make on public services and to understand what best practice looks like.
Produced for Education Resources by Communications and Strategy. 062036/Aug22
If you need this information in 
another language or format, 
please contact us to discuss how 
we can best meet your needs.
Phone: 0303 123 1015 
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk
From the Convention on the rights of the child in child friendly language, UNICEF Canada
UN Convention on the
Rights of the Child
In child friendly language
Survival Development Participation Protection
You have a right to life, good food,
water, and to grow up healthy
“Rights” are things every child should have or be able to do. All children have the same rights. These rights
are listed in the UN Convention on the Rights of the Child. Almost every country has agreed to these rights.
All the rights are connected to each other, and all are equally important. Sometimes, we have to think about
rights in terms of what is the best for children in a situation, and what is critical to life and protection from
harm. As you grow, you have more responsibility to make choices and exercise your rights.
You have a right to an education
and time to relax and play
You have a right to say how you feel,
be listened to, and taken seriously
You have a right to be treated 
well and not be hurt by anyone
You have the
right to privacy.
You have the
right to get
information that
is important to
your well-being, from radio,
newspaper, books, computers
and other sources. Adults
should make sure that the
information you are getting
is not harmful, and help you
find and understand the
information you need.
You have the right to be
raised by your parent(s) 
if possible.
You have the right to 
be protected from being 
hurt and mistreated, 
in body or mind.
You have the right to special
care and help if you cannot
live with your parents.
You have the right to help
from the government if you
are poor or in need.
You have the
right to food, clothing, a
safe place to live and to
have your basic needs
met. You should not be
disadvantaged so that
you can’t do many of the
things other kids can do.
You have the right to a
good quality education.
You should be encouraged
to go to school to the
highest level you can.
Your
education
should help
you use and develop
your talents and abilities.
It should also help you
learn to live peacefully,
protect the environment
and respect other people.
You have
the right to
practice your own culture,
language and religion - 
or any you choose.
Minority and indigenous
groups need special
protection of this right.
You have the right to be alive.
You have 
the right 
to a name,
and this should be
officially recognized 
by the government.
You have the right to 
a nationality (to belong
to a country).
You have the right to an
identity – an official record of
who you are. No one should
take this away from you.
You have 
the right to
live with your parent(s),
unless it is bad for you.
You have the right to
live with a family who
cares for you.
If you live in a different
country than your parents
do, you have the right to be
together in the same place.
You have the right to care
and protection if you are
adopted or in foster care.
You have the
right to special protection
and help if you are a
refugee (if you have
been forced to leave your
home and live in another
country), as well as all the
rights in this Convention.
You have
the right
to special education
and care if you have
a disability, as well as
all the rights in this
Convention, so that you
can live a full life.
You have the right to the
best health care possible,
safe water to drink,
nutritious food, a clean 
and safe environment, 
and information to help
you stay well.
If you live
in care or
in other
situations away from
home, you have the
right to have these living
arrangements looked at
regularly to see if they
are the most appropriate.
You have the right to be
protected from kidnapping.
You have the right to give
your opinion, and for
adults to listen and take it
seriously.
You have 
the right
to find out
things and share what
you think with others,
by talking, drawing,
writing or in any other
way unless it harms or
offends other people.
You have the right to
choose your own religion
and beliefs. Your parents
should help you decide
what is right and wrong,
and what is best for you.
You have the right to choose
your own friends and join or
set up groups, as long as it
isn’t harmful to others.
Everyone under 18 
has these rights.
All children have
these rights, no
matter who they
are, where they
live, what their parents do,
what language they speak,
what their religion is, whether
they are a boy or girl, what
their culture is, whether they
have a disability, whether they
are rich or poor. No child should
be treated unfairly on any basis.
All adults should do what
is best for you. When adults
make decisions, they should
think about how their
decisions will affect children.
The
government
has a
responsibility to make sure
your rights are protected.
They must help your family
to protect your rights and
create an environment
where you can grow and
reach your potential.
Your family has the
responsibility to help you
learn to exercise your
rights, and to ensure that
your rights are protected.
Article
1
You have 
the right to 
play and rest.
You have
the right to
protection
from work that harms
you, and is bad for your
health and education.
If you work, you have
the right to be safe 
and paid fairly.
You have the right to
protection from harmful
drugs and from the 
drug trade.
You have the
right to be 
free from 
sexual abuse.
No one is
allowed to
kidnap or 
sell you.
£
You have the right to
protection from any kind of
exploitation (being taken
advantage of).
No one is allowed to
punish you in a cruel or
harmful way.
You have
the right to protection
and freedom from
war. Children under 15
cannot be forced to go
into the army or take
part in war.
You have the right to
help if you’ve been hurt,
neglected or badly treated.
You have the right to legal
help and fair treatment
in the justice system that
respects your rights.
If the 
laws of 
your country provide
better protection
of your rights than
the articles in this
Convention, those 
laws should apply.
You have the right to know
your rights! Adults should
know about these rights
and help you learn about
them, too.
These articles explain
how governments and
international organizations
like UNICEF will work
to ensure children are
protected with their rights.
Article
2
Article
3
Article
4
Article
5
Article
11
Article
12
Article
13
Article
14
Article
15
Article
6
Article
7
Article
8
Article
9
Article
10
Article
21
Article
22
Article
23
Article
24
Article
25
Article
16
Article
17
Article
18
Article
19
Article
20
Article
31
Article
32
Article
33
Article
34
Article
35
Article
26
Article
27
Article
28
Article
29
Article
30
Article
41
Article
42
Article 
43 to 54
Article
36
Article
37
Article
38
Article
39
Article
40
18
£
7
SLC 
print proof
281

Page 282

Children’s Rights activity 
and preparation for the
UNCRC requirements
Staff have been using the draft guidance on Child
Friendly Complaints to look at practice regarding
complaints and agree where changes require to be
made to offer a more child friendly approach which
supports children and young people share their views
when complaints about services that affect them are
made. Plans are now in place to revise the complaints
procedures to ensure it is more child friendly. 
(Article 12 – the right to be heard)
We are carrying out more Children’s Rights Wellbeing
Impact Assessments (CRWIAs) than ever before for
key decisions that affect children and young people,
making sure that the voice of children and young
people informs policy and decision making. 
(Article 12 the right to be heard)
We have been increasing our support to staff through
awareness raising and training about the UNCRC and
the requirements of the Act. Training has been offered
to staff both in person and through the use of online
learning webinars. Youth Family and Community
Learning staff have benefited from a series of UNCRC
workshops and a webinar for staff in schools has been
made available through the Education Inclusion Service.
(Article 42 – the right to know your rights)
A group of young people are designing and delivering
a filmed webinar for all public sector staff that provides
information on the UNCRC and what public services
need to do to ensure children’s rights are respected.
This training will be available on the council’s online
training platform and offered out to all public sector
organisations. This approach puts children and young
people at the heart of our preparations. 
(Article 42 the right to know your rights)
A selection of the many examples of children’s rights practice over the last
year from across South Lanarkshire is shared below:
Dignity
Participation
Life, survival and
development
Non discriminationTransparency and
accountability
Best interests 
of the child
Interdependence
and indivisibility
7The principles
Child rights- 
based approach
Section three:
Children’s Rights in South Lanarkshire
8
Children’s Services Plan
2023—2024
SLC 
print proof
282

Page 283

As part of our staff development support, we have
updated our Getting It Right For Every Child (GIRFEC)
website, which now has up to date advice and guidance
on children’s rights and the UNCRC. This will be updated
on a regular basis as more support and guidance is
made available, making sure staff are well informed
about children’s rights and their role in supporting them.
(Article 3 the best interests of the child)
We have organised several conferences and seminars,
with children and young people taking a leading
role in the planning, delivery and participation in the
events. The events include:
T A UNCRC themed seminar in November 2023 for
140 staff where young people through a film they
made set the agenda for staff discussion on their
role in supporting children’s rights 
(Article 4 your rights are protected)
T An event to celebrate Care Day in February 2024,
where young people from our Champion’s Board
hosted the event and challenged corporate
parents to tell how they were keeping South
Lanarkshire’s Promise. This event brought together
at least 60 care experienced children and young
people and 60 corporate parents to improve
the understanding and visibility of each other
(Articles 9, 20 and 21 the right to be cared for)
T Our Wellbeing Warriors were at the heart of
a conference in March helping to share good
practice in schools across South Lanarkshire to
support emotional wellbeing. The event also
helped highlight other important supports that
were available to support children and young
people’s mental health and emotional wellbeing.
(Article 24 the right to health care)
We have refreshed and relaunched our care
experienced Champions Board making it more visible
to all care experienced children and young people
and to corporate parents. We have introduced a ‘Mini
Champs’ process and made sure that pupils in schools
have the opportunity to be heard. 
(Article 12 the right to be heard)
Our Champions Board helped to make our Winter
Wishes campaign a success and make sure that care
experienced young people got extra help over the
Winter period with cost of living challenges including
access to food, Winter clothing, help with paying
bills and having their basic needs met, despite the
challenges of the cost of living and price increases.
(Article 27 the right to food and clothing and a
place to live)
Children from four primary schools helped to inform
the new East Kilbride Neighbourhood Plan through
participating in workshops and engagement sessions
and through filling in questionnaires. This helped to
make sure that the priorities being developed as part
of the neighbourhood plan are child friendly. 
(Article 12 a right to be heard and Article 31 the
right to play and rest)
Support from the national Promise Fund is helping
us support a reduction in the criminalisation of care-
experienced young people who are over-represented
in the justice system. Care and justice experienced
young people are coming together through the
ASK youth justice and rights approach to inform
how best young people can be safeguarded in their
communities. The work is being led by young leaders
and peer researchers, supported the council, COVEY
and the university of the West of Scotland. 
(Article 19 the right to be protected from harm and
article 40 the right to help in the justice system)
9
SLC 
print proof
283

Page 284

Section three:
Children’s Rights in South Lanarkshire
What next for children’s
rights and participation in
South Lanarkshire
The work of our partnership is founded on a rights-
based approach which supports practice and aspires to
the best possible outcomes for all children and young
people, particularly those who are most disenfranchised.
The following areas of work we will prioritise over the
next year:
T We will work to ensure that the voices of children
and young people are listened to at the highest
level across our children’s services partners.
T We will continue to promote rights-based
practice, so all children’s views are heard by all
partners when deciding about care plans and
their future with children’s views at the core of
decision-making.
T We will make sure children and young people
inform our preparation for UNCRC incorporation
and our rights-based culture in general especially
through the staff webinar being developed.
T As an integral part of our thematic groups,
children, young people and families will help
design future services based on their experiences
in the past, their current needs and their
aspirations for the future.
T We will be more innovative in the way we 
involve children and young people, especially
those who do not tend to engage in traditional
consultation processes.
T We will build on the involvement of children and
young people leading and contributing towards
seminars, conferences and other events with staff.
T We will deliver our Project Child Voice, ensuring
that children and young people are visible and
heard in future budget setting processes. 
T We will develop a comprehensive set of training
resources to help support staff across the
public sector, be more aware of the UNCRC
requirements and increase their understanding in
what their responsibilities are. 
T We will ensure that the seven principles of rights-
based practice are at the heart of our work.
10
Children’s Services Plan
2023—2024
SLC 
print proof
284

Page 285

Section four:
Our plan and its progress
11
We are working together to shift from crisis responses
to more proactive approaches by providing support to
families earlier to reduce the likelihood of difficulties
arising in the first place. This involves working with the
family to identify their needs and potential solutions.
Our Whole Family Approach Thematic Group, in
collaboration with partners from education, health,
social work, and the third sector, coordinates support
efforts. We aim to leverage strong relationships to
address the needs of the entire family and minimise
the necessity for future interventions.
We have structured our time, energy, and resources
to focus on prevention. We are providing early help
by building on family strengths and making the most
of community support to offer practical solutions and
reduce any barriers families face. Our holistic family
and trauma-informed support takes a ‘no wrong
door’ approach to deliver comprehensive support for
individual families.
As stated in our plan, we have agreed a number of
areas of change that are being supported by a shared
commitment to strong leadership and workforce
strategy, a support system that is accountable to
families, and better accessibility to support.
Making sure that our families are at the centre of the
design of new and changing services has been a feature
of our work in a number of areas and this commitment
will continue to be a core aspect of our approach.
Our improvement work has focused on the following:
T Helping families inform the support they are
offered at the earliest stage
T Reducing the need for more formal support from
Social Work 
T Extending the successful Pathfinder project
T Building staff competence to support parents
T Working to address and reduce the instances 
of neglect
T Addressing domestic abuse
T Supporting families with disability with 
financial wellbeing
Transforming Whole Family Support
Central to our Whole Family Approach is helping all families to flourish and get
the right support at the right time supporting a child’s right to be raised safely
in their own families, for as long as they need it. SLC 
print proof
285

Page 286

Section four:
Our plan and its progress
12
Children’s Services Plan
2023—2024
The following section details the work
undertaken in relation to each of our
priority themes:
Our Outcome - Every family 
that needs support gets the 
right family support at the right
time for as long as it is needed
Reducing the number of babies,
children and young people living
away from their families
Family Group Decision-Making
To reduce the number of babies, children and young
people who have to live away from their families we
have been supporting families with Family Group
Decision Making sessions for all families identified by
our early years multi agency networks as needing
extra help during pregnancy. This has resulted in
100% of families experiencing improved outcomes.
We have been also able to offer the additional help
of Peer Support Workers who are providing advice
and guidance to pregnant mothers and their partners
with a range of issues, including drug and alcohol use.
Putting in place a Parents’ Plan for families instead
of making a child protection referral has helped
to support families across South Lanarkshire
and has meant that families have experienced
improvements in coping with the challenges they
face. Implementing a Parents’ Plan for families,
instead of initiating a child protection referral, has
proven beneficial in supporting families across South
Lanarkshire. This approach has resulted in positive
outcomes for families.
Family Support Hubs
Community based Family Support Hubs were
launched on 27 September 2022 and are helping to
improve wellbeing of whole families. The hubs are
community facing and offer better access to support
for families in Cambuslang, East Kilbride, Hamilton
and Lanark.
The hubs have had such a positive impact on families,
that families themselves are now the second largest
referrer to this support and in the past year, hubs have
been able to address 61% of the total referrals made
to Social Work. This significantly reduces the number
of initial assessments that have to take place by staff
in a more formal setting and in turn helps to give more
time for staff to respond to child protection referrals.
Reducing the number of families
who require crisis support
Pathfinders
The Pathfinders Programme delivered by the Youth
Family and Community Learning Service is supporting
young people and families across seven schools,
Cathkin High; Trinity High; Stonelaw High; Lanark
Grammar; Calderside Academy; St Andrew’s and
St Bride’s, and Carluke High. Pathfinders is funded
through a mix of Whole Family Wellbeing Funding and
Pupil Equity Funding. The programme has supported
534 young people and families through individual and
group support, home visits and parental engagement
which helped to meet family needs.
Pathfinders secured funding from the UNCRC
Innovation Fund to develop a youth led consultation
process that allows young people to be the change
that matters in relation to areas that effect their lives.
This approach helps to increase the voice and skills of
young people and has created rich opportunities for
a committee of 21 young people to directly influence
the service that they receive and be involved and
influence decisions affecting them.
The young people are now planning a series of
consultation events with other young people and a
conference for key partners, sharing life experiences,
barriers to participation and evidence of need to
shape future policies.
As a result of the project, the young people have
increased meaningful participation in school and
learning by 88%, reported an 18% positive change
in their behaviour and improved their health and
wellbeing by 24%.
SLC 
print proof
286

Page 287

13
Engaging with families
Providing participation opportunities for families to
share their views and experiences has helped to enable
parents and carers to inform the support available
and made sure that services on offer better reflect
the needs identified and ensure children’s and human
rights are respected. Participation opportunities have
included an event in Hamilton for a range of parents
and carers including parents who have children with
Autistic Spectrum disorder and Kinship Carers, work
with the Supporting Families initiative in Clydesdale
and with families supported by the Youth, Family and
Community Learning service in Cambuslang.
Through this engagement parents and carers were
able to tell us about their experiences of accessing
support, how they feel about being listened to and
how confident they are in their parenting abilities. Their
feedback highlighted the challenges faced by families
in the community and helped staff to understand what
changes are required to the way we deliver services.
As a result of this activity, we are shifting more to a
needs and rights-based planning approach that has
family voice at its heart. Families have told us that
support is now more accessible, delivered where and
when it suits them and is helping to provide the early
help and support that they need to thrive.
Moving forward we are planning more engagement
events and opportunities for families to share their
experiences and aspirations.
Reduced inequality gap in child
development
You and Your Child
Two ‘You and Your Child’ programs which focus on
helping parents and carers understand how their
child grows and develops have been delivered
by trained staff in Lanark and Cambuslang
benefiting 22 parents and carers who participated
in the programme. All parents who completed the
programme reported that they are now more aware
of what to expect at each point in their child’s
development and more confident in supporting their
child with their needs. A programme in the Hamilton
area is planned to begin in April 2024.
Parents told us the good variety of materials,
informative sessions, interactive activities,
and supportive staff helped them feel more
knowledgeable about child development and be
more patient and supportive towards their children
as a result of the program. The sense of community
and the opportunity to make new friends was also
highlighted as a positive aspect of the experience.
NHS Early Years Workers support
Early years workers in NHS Lanarkshire have been
working in partnership with parents and carers
to deliver successful parenting strategies in a
variety of community settings. This has resulted in
75% of children seeing improvement across their
developmental milestones using the ‘Ages and Stages
Questionnaire’ to measure success. These workers
have developed a close working relationship with
Health Visitors to offer more integrated support to
children and families.
Ongoing evaluation of the workers’ role has shown that
94 children have benefited from this support and 68
have recorded improvements in speech and language,
physical development and problem-solving skills.
Parents and carers have told us about the difference
that this support has made to their family:
“My Health Visitor referred me
on to the Early Years Worker as she
was worried about my child not
meeting child development standard.
I have had really good advice
about my daughter’s flat head and
development. We use tummy time,
and she now has a bedtime routine
and I bathe and read to her each
night. She loves her books, and we
are enjoying this. She has now passed
her 4-6-month development and
she is thriving. Wee tips, advice and
re-assurance has led me in the right
way and she is now starting to sit by
herself and has started weaning.”
SLC 
print proof
287

Page 288

Section four:
Our plan and its progress
14
Children’s Services Plan
2023—2024
“I’ve really seen progress in my
wee boy. He had delayed speech, and
the worker brings lots of activities
and there is always something new
for him to do. The baby joins in games
as well. The worker was at the house
today and we did finger painting. He’s
starting to learn his colours and he is
definitely making more sense; I can
make out what he is saying now. 
He’s come on leaps and bounds.”
“We worked with Lucy from Early
Years and our son loves her. We feel
Lucy has grown a good bond with
ourselves and children and don’t feel
she is like a worker coming in as she’s
not judgemental and always helpful.
Our son smiles when we tell him 
Lucy is coming to visit.”
Reducing the inequality gap in
wellbeing outcomes for families’
children and young people
The Supporting Families Programme
Supporting Families is a ‘whole family’ approach
that is helping to remove barriers to social and
economic exclusion. The project supports children
from disadvantaged backgrounds and their families
and is helping to lessen the negative affect that
suffering from child poverty can have. Families are
referred to the project by their primary school and
are allocated a dedicated worker who provides
support and guidance as well as signposting onto
other organisations and services who can provide
the right help in the right way, such as financial or
employability support.
Children within the families have benefited from
enhanced and flexible wraparound services such
as free after school childcare provided by South
Lanarkshire Leisure and Culture, and parents and
carers are encouraged to attend free health and
wellbeing opportunities to improve their physical
and mental wellbeing. These opportunities are
promoting increased use of greenspace and helping
to improve involvement in the local community,
providing activities for the whole family to enjoy.
Some of the activities delivered through the project
include healthy walks, group cycles and family cycle
skill sessions, yoga, fitness classes and free access to
swimming. The programme has been available to
families living in the Cambuslang, Rutherglen, Larkhall
and Rigside areas of South Lanarkshire.
Increasing the number of families
taking up wider supports
Health care support for care
experienced young people
As part of an approach to improve the healthcare
that care experienced young people receive, NHS
Lanarkshire and Social Work’s Young Person Service
have been testing a new way of supporting young
people who are leaving care. As a result of this young
people proactively engage with adult services, to
reduce the likelihood and need for crisis responses.
The testing of this new approach finished at the end
of March and as a result of positive feedback from
young people the work will continue to be led by the
School Nursing Team.
Over a hundred young people were offered the
healthcare support between August 2022 and March
this year with two thirds positively engaging with the
service and almost all of them reporting that their health
needs were being met and wellbeing was improving.
SLC 
print proof
288

Page 289

15
Paths away from Poverty
Paths away from Poverty is funded by the Scottish
Government’s Child Poverty Accelerator Fund and is
supporting families where there is a child or a young
person in the household with a disability. While this
project is in the early stages of development (it will
run until March 2025 working with at least 10 families)
it is beginning to identify potentially more effective
ways to engage and support families to deal
with financial, wellbeing and inclusion challenges.
Support is delivered primarily through a key worker
relationship, with workers for the project being
provided by the third sector organisation COVEY.
The project is currently supporting five families
address and find solutions to a range of challenges
with a number of families ready to be referred
for support. Already benefits to the families have
included improved financial wellbeing through
help with urgent financial wellbeing assessments,
improved health and wellbeing as a result of
strengthened relationships with NHS Lanarkshire,
CAMHS and local GPs, reduced social isolation with
three families moving to weekly support and one
young person benefiting from COVEY befriending
support with other additional needs young people.
In addition, families are articulating what has
changed for them because of the support they have
received They are choosing to engage and to receive
support that they feel is helping towards personal
plans and solutions.
Supporting leadership, 
workforce and culture
Developing a whole workforce approach
to domestic abuse
Frontline staff in our Family Support Hubs have been
supported to help families experiencing domestic
abuse by being trained in the Safe and Together
programme. Thirty-seven staff have been trained,
which is over half of staff in the hubs. As a result of
the training, almost all (90%) of staff stated that
they were more confident about their knowledge,
skills and in helping families address domestic abuse
and in applying the Safe and Together approach.
Staff were asked to rate their confidence before and
after the training and on average they recorded an
increase of 16% as a result.
Reducing Neglect
Health and Social Work staff have been supporting
parents to identify where their strengths can help
combat the risk of neglect for their children and also
to identify where they can make things better as a
family. Over a hundred staff from Social Work have
completed special training on the use of a resource
called the ‘Working with Neglect Toolkit.’
To support this work and to help families reduce
the experience of neglect a forum has been set up
for staff which is organised by the council’s Child
Protection Officer. More sessions are planned for staff
in June and October in the use of this toolkit to make
sure families get the best support they can. As a result
of the help this training has given staff, there are
plans to offer the training to School Nurses, Health
Visitors and Family Nurses across NHS Lanarkshire.
An important feature of this work will be to monitor the
number of staff trained, how the training helps them
support families and how use of the toolkit helps to
reduce the number of families being harmed by neglect.
SLC 
print proof
289

Page 290

Section four:
Our plan and its progress
16
Children’s Services Plan
2023—2024
Our work to improve the health and wellbeing for all
children, young people and families in South Lanarkshire
is led by the Health and Wellbeing Thematic Group
and reinforced by taking a whole systems approach
to supporting mental health and wellbeing.
This approach emphasises support that is:
T Empowering
T Offering the right support at the right time, and
T Ensuring a ‘no wrong door’ approach, so that
children and young people tell their story only once
We have established or extended a number of
community-based initiatives for our children and
young people e.g. Kooth, an online wellbeing and
counselling support for children and young people,
the Blues programme and the delivery of peer
support programmes in schools through mental
health and wellbeing workshops for families and staff.
In addition, there has been an increase in capacity
to deliver focused supports to the most vulnerable
children and young people through the Trauma
Recovery Service and additional practitioners to
support those who are care experienced.
The supports offered through the work of the
Thematic Group and any plans for new supports
have been informed by the voice of children and
young people at the heart of our planning. The
improvement work includes the following:
T Supporting maternal and infant mental health
T Improving support offered to children and young
people at risk of self-harm and suicide
T Improving access to online mental health support
T Supporting the emotional wellbeing of staff 
T Improve whole system approaches to 
mental health and wellbeing
Improving the health and wellbeing of children,
young people and their families
As a partnership supporting children and young people’s mental health is
important to achieving positive outcomes. Our approach supports protecting
mental health at an early age and delivering early support to ensure robust
future mental wellbeing and resilience, as well as wider life outcomes.
SLC 
print proof
290

Page 291

17
Outcome - Every child and 
young person will be able to
access support which helps
improve their mental health 
and emotional wellbeing
Improved maternal and 
infant mental health
Mellow Bumps
Families have been benefiting from the Mellow
Bumps programme, which is a part of our work to
improve parenting support and is delivered from the
Family Support Hubs.
Mellow Bumps is a six-week group work programme
designed for pregnant mums, where families need a
little bit extra support to prepare for the birth.
The programme helps develop attachment, emotional
and behavioural support and child development skills.
Parents are being helped to increase their knowledge
and understanding about stress, anxiety and self-
care during the pregnancy. This helps parents to
communicate in a warm, loving manner with their
babies. Three programmes are already being delivered
across South Lanarkshire and a new programme will
be offered in the Clydesdale area soon.
Breastfeeding friendly
As part of the commitment to breastfeeding friendly
status, we have improved our employee wellbeing
by updating our breastfeeding policy as well as
listening to the views of staff. We are working with
early learning and childcare facilities to test the
approach, with a planned information session for
nurseries, private providers, and childminders in May
2024. All Leisure and Culture services are signed up
to the scheme alongside the four Family Support
Hubs. In addition, we have been meeting with staff
from Health and Social Care to discuss partnership
commitment in preparation for the release of the
Baby Friendly Accreditation Councils.
Improved support offered to
children and young people who may
be at risk of self-harm and suicide
Implementation of Lifelines Lanarkshire
Lifelines Lanarkshire training continues to increase
the confidence of staff who support children and
young people at risk of self-harm and suicide. In the
last year, over 170 staff from education, social work,
health, and the third sector have attended the skilled
level training, with almost all reporting that it helped
to make them more prepared and increased their
confidence to offer help to children and young people
at risk of self-harm and suicide.
In addition to the Lifelines Lanarkshire training, staff
have been benefiting from participating in an online
learning course which has been created to help build
greater knowledge and understanding of issues
around self-harm and suicide. So far, 89 staff have
accessed the Lifelines Lanarkshire Learn Online course
and all who responded highlighted that the learning
has been helpful to them in supporting children and
young people.
Improving professional learning
opportunities for staff
We are committed to making sure that all staff
supporting the emotional wellbeing of children, young
people and families get the best guidance and training
possible. To help with this we have been working with
partners to explore the need for further staff learning
opportunities. Feedback from Lifelines Lanarkshire
trained staff has pointed to the need for further, more
enhanced professional learning to help them to continue
the support they provide to children and young
people who are at risk of self-harm and/or suicide.
SLC 
print proof
291

Page 292

Section four:
Our plan and its progress
18
Children’s Services Plan
2023—2024
Improved whole system approaches
to mental health and wellbeing
Counselling through schools
Children and young people in our schools are
benefiting from support through the Counselling
Through Schools Service. As a result of this support,
almost all of the 480 pupils who have told us about
their experience said counselling improved their
general mental health and wellbeing. They were
made to feel safe in counselling.
We have been working to ensure a more consistent
offer of support to pupils in secondary schools as
part of whole school support for mental health and
wellbeing. We met with counselling providers in all 17
high schools to talk about how school counselling links
to wider supports across the community and have
identified areas where links could be improved (for
example, being more aware of and making better
use of the third sector support available; being more
consistent in referring to available support). This will
help us plan how we offer more connected support to
children and young people going forward.
Increasing the awareness of help 
in the community
As part of our approach to improving access to
support in a community setting, educational
psychologists and health improvement colleagues
have been working together with counselling
providers to further understand the factors that
affect the health and wellbeing of children, young
people and families. In particular, we have looked
at how our understanding informs current practice
in relation to referring, signposting and making
connections with other agencies and community
supports. This work will help improve awareness of
what support is available across our communities
and how it can be best used to help children, young
people and families.
Reducing the stigma of mental health
To support our communities to become safe,
compassionate, inclusive, and free of stigma, we are
working with Stigma Free Lanarkshire and Lanarkshire
Links to encourage young people to challenge mental
health stigma and discrimination.
The specialist expertise of Stigma Free Lanarkshire
is helping to develop resources that are free from
stigmatising language and promote anti-stigma
messages. So far, 12 Understanding Mental Health
Stigma and Discrimination workshops have been
delivered with 112 staff from Education, the wider
council and third sector and this has helped to
increase staff understanding of the negative impact
that mental health stigma has on children, young
people and families.
In addition, two events focusing on challenging
mental health stigma and discrimination were held for
young people with lived experience and our 11 Young
People Mental Health Ambassadors. One young
person said: “As young people, mental health can be
a daunting idea which can be difficult to talk about,
but the day broke down so many barriers.”
Wellbeing Warriors
The Wellbeing Warriors are a group of young people
from across our secondary schools who link with
partners around mental health and emotional
wellbeing. The group was established this session,
with the aim of ensuring young people’s voices inform
the development of mental health and wellbeing
supports delivered.
The group identified a number of issues they felt
would be helpful to learn more about for their own
learning and development, which included stigma
and discrimination, men’s mental health, and
strategies to support wellbeing.
The highlight of the year was a Wellbeing Warriors
Conference involving 100 pupils from most of our
secondary schools and key supporting organisations.
The conference provided the young people with the
opportunity to share practice from across schools
and build supportive links with each other. It also
increased awareness of the help available and how
to access it, and improved connections between the
services delivering support to young people.
Participants heard from Kooth about their digital
support services, from Stigma Free Lanarkshire about
how to recognise and challenge stigma, and from
Scottish Action for Mental Health (SAMH) about the
work they are doing in schools.
SLC 
print proof
292

Page 293

19
Young people who attended told us that the
conference was useful (90%), and almost all stated
they would attend again in the future.
“I really liked hearing from all the
different organisations about the work
they do and being able to interact
with them and ask questions.”
The conference helped young people talk about
tackling mental health stigma and share their
thoughts through a ‘Wish Tree,’ where they could
anonymously express their ideas. Young people
were asked: “How do you think you should tackle
stigma?” The feedback and comments received
were insightful and inspiring.
“Treat others as you expect to be
treated yourself.”
“Talk to young people, 
there’s nothing bad about talking
about mental health.”
“Help people to know it’s okay 
to not to be okay.”
“Try our hardest to make sure people
are aware and educate others.”
Following the conference, Stigma Free Lanarkshire
are working with pupils in first, second and third
year at Trinity High School in Cambuslang to deliver
Understanding Stigma workshops. The Wellbeing
Warriors continue to meet and help support the
development of important areas of provision for all
our children and young people.
Improved visibility and accessibility
of community mental health
supports and services
Online support for young people
Kooth, our online digital mental health resource for
young people, has continued to be rolled out across
South Lanarkshire. Between April 2023 - March 2024,
848 young people used the support, with over 90%
of children and young people who responded telling
us that they would recommend the service to others.
Presentations have been given at a number of events
such as the “Wellbeing Warriors Conference,” 
whole school assemblies and a session is planned 
for GPs to continue to raise awareness of this service
with all partners.
Helping care experienced young people
access support
As part of our work to make sure care experienced
young people get the best emotional wellbeing
support possible, we have developed a ‘Pathway’
for those young people who are ready to leave care.
In doing this we have worked with mental health
support services to plan for offering the right level of
support for those young people as early as possible
when a need is identified. Using this approach,
which is being led by the School Nursing Team, 102
young people have been supported since August
last year. Two thirds of those young people who were
supported told us that this had helped to improve
their mental health and emotional wellbeing.
Peer Support Programme in schools
A peer support pilot in secondary schools has been
delivered to help young people feel more prepared
to support their friends and other young people with
wellbeing needs. Scottish Action for Mental Health
(SAMH) are helping to deliver the peer support
programme to senior pupils across nine schools.
Peer supporters who completed the training indicated
that the sessions helped to prepare them for their role
(98%), and almost all said they now know where to
find help and support, should they or others need it.
SLC 
print proof
293

Page 294

Section four:
Our plan and its progress
20
Children’s Services Plan
2023—2024
Improving access to community 
mental health supports
In response to feedback from children and young
people, a website has been specifically designed
to help provide age-appropriate information about
mental health and emotional wellbeing, and to
signpost resources. Young people from schools and
youth centres and projects have worked with Children’s
Services partners to create the website design and
content. The website wellbeingsouthlan.co.uk was
launched in June 2024 and is now available to
children and young people across South Lanarkshire.
Supporting the emotional wellbeing
of staff and others
Supporting staff
We are committed to supporting the wellbeing of
Children’s Services staff. As part of this commitment,
we have begun to review available supports to
improve the wellbeing of the workforce. So far, the
review has included assessing needs within education
and analysing data and feedback around a range of
supports, including Place2Think, SAMH Managing my
Wellbeing Workshops, Children’s House Manager Staff
Reflection and Family Support Hub Reflective Practice.
Recognising the needs identified within education
and to enhance supports, a ‘supervision pilot’
initiative for staff in schools involved in child
protection processes was established in 17 secondary
schools. Almost all staff involved reported increased
confidence in applying the learning from this
course to their own context. A Staff Support and
Development Group has also been established with
the aim of providing peer support and sharing best
practice amongst secondary school staff who work
directly with vulnerable young people.
To support the wider workforce, ‘Managing my
Wellbeing’ workshops have been delivered to 383
staff, with 96% of staff reporting that the workshop
was useful in helping them in their practice and 99%
saying that they would recommend attending the
workshop to others.
Increase understanding and 
improve identification of infant 
mental health concerns.
An online training session was delivered by the Infant
Mental Health team to raise the awareness of staff in
early learning and childcare settings in the importance
of positive infant mental health. This has now been
developed into a permanent online course that can
be used by the whole workforce to improve their
understanding of emotional wellbeing in infancy.
Training on infant mental health is also being provided
as part of wider training to support child protection.
Staff have increased their understanding about how
emotional wellbeing in early stages can help shape
who children are, the attachments they form with
their parents and carers and how they manage their
emotions. Staff also are provided training on the use of
resources that help to observe and understand a child’s
emotional wellbeing. These resources are being made
available to staff across children’s services settings.
SLC 
print proof
294

Page 295

21
In South Lanarkshire, we are committed to the
overall vision of The Promise and are working on key
aspects such as ‘a good childhood,’ the voice of care
experienced children and young people and through
our whole family approach. The work to deliver real
and meaningful change, as aspired by The Promise,
is led by the Keeping The Promise Thematic Group,
who are staff from organisations that are working to
provide better support for care experienced families
for example, access to health support, providing an
education that fully meets learners needs, promoting
the importance of strong and consistent relationships
(particularly brothers and sisters), improving access
to advocacy support, the decriminalisation of care
experienced young people, supporting young people
with moving on from care and ensuring the right
support is available for all families at the right time.
Our chief officer level Promise Board ensures a shared
level of accountability set up to drive change and our
Champions Board creates the opportunity for our care
experienced children and young people to articulate
their views and experiences with corporate parents
including the Promise Board. This is already helping us
shape and adapt practice to meet The Promise vision.
Our dedicated Promise Participation Team works to
elevate voice through creating opportunities for the
participation of care experienced children and young
people on the issues that matter to them.
The following information reflects the programme of
improvement activity to support care experienced
children, young people and families and builds on
the important successes of the previous two-year
children’s services plan.
Our focus has been on the following:
T The voice of children and young people in 
decision making 
T Accessible mental health support
T Help with sustaining further and higher education
opportunities and greater employability options
T Access to health care with dedicated nurses 
to support better health outcomes for 
young people 16 - 26
T Young people over 16 benefiting from improved
and more consistent pathway planning especially
in terms of housing
T Support with managing finances
T Brothers and sisters
T Youth voice in the youth justice system and our
approach to contextual safeguarding
Keeping the Promise to our care experienced
children, young people and families
SLC 
print proof
295

Page 296

Section four:
Our plan and its progress
22
Children’s Services Plan
2023—2024
Outcome - Children and 
young people grow up loved,
safe, respected and listened to
Voice is at the heart of all decision-
making processes at all levels
Children and young people informing
their plans
Almost all (96%) of the young people living in our
Children’s Units have been actively involved in
developing tools and paperwork that help to plan
the help and support they are offered by Corporate
Parents. The paperwork has also been reviewed by the
Champions Board (a group of care experienced children
and young people who have been established to inform
planning, decision-making and how children and young
people are supported). The young people said they felt
that the result was a process that was more child and
young person friendly, with more simple paperwork that
also gathered their experiences and voices and was
easier to understand how the support offered as part of
their plan would make a positive difference to their lives.
To make sure that the new approach is being used,
staff from the Children’s Units meet with other staff
from Social Work to review the content of the plans
and make sure the views of children and young people
are informing the help and support they are offered,
Influencing Change
Children and young people have had lots of
opportunities to influence change in the way services
are delivered. The Champions Board was relaunched
in January 2024 with new members and were
immediately involved in influencing the work of the
Keeping The Promise Thematic Group. The ‘Champs’
were heavily involved in delivering an event in February
to mark ‘Care Day’ and are leading the thematic group
in preparations to celebrate Care Day in 2025. As a
result of their work, Corporate Parents have agreed
to be more visible and accessible to the Champs and
a programme of engagement is in place, including
meetings with the council Chief Executive. They are also
working with Housing officials to develop and deliver a
dedicated Housing Protocol that is making sure young
people leaving care have the best support available
when moving into an independent living situation.
Some young people were actively involved in a
recent ‘Care and Prejudice’ seminar, which helped
to increase the awareness of the Champion’s Board
and the difference they are trying to make for care
experienced children and young people.
You said, We did
The Champions Board have been helping to develop
the commitment to make sure everyone who is
involved in consultation and participation events and
processes understands how their views and ideas are
used. They have been developing a ‘Feedback Loop’
including an input to the Scottish Government on
climate change and are holding corporate parents to
account through regular updates in relation to plans
to improve support around finance, employment, and
mental health. The Champions Board are reporting
progress in respect of feedback across the council
which was a theme identified at our Care Day event
this year and are developing a ‘Mini Champs’ network
with pupils in our schools to develop increased
support to the care experienced teaching staff.
The Champs are also involved in helping to set new
actions and goals for the Keeping the Promise Action
Plan, to make sure that we are doing all we can with
the resources available to improve the life chances of
care experienced children, young people and families.
Increased number of care experienced
people accessing further and/or
higher education opportunities and
successful employment
Sustaining participation in 
employability programmes
The employability team tracks the destinations of
all care experienced young people aged 16-19 and
works with Skills Development Scotland and Social
Work to support care experienced young people
into employability programmes designed to support
young people’s journey into work. Over the last
year, 57 care experienced young people progressed
from a range of programmes offered by the Local
Employability Partnership.
SLC 
print proof
296

Page 297

23
Sustaining Further and Higher Education
The work to support care experienced young people
begins early in their school journey access to the
right career information, advice and guidance, which
helps young people reach positive destinations after
leaving school.
Skills Development Scotland advisors speak to young
people and offer coaching by a professional careers
advisers up to five times in any one school year. This
includes support with applications, preparation for
interviews and staying in contact once the young
person leaves school. The support is delivered in
school, or in Children’s Units, wherever the pupil feels
most comfortable. This support has proven to be
valuable for young people in their journey into Further
and Higher Education courses helping to build the
skills and knowledge to find the right opportunity
and sustain their place on their course. If a young
person is at risk of dropping out of a course an advisor
is in contact to offer support. A dedicated adviser
is available in South Lanarkshire College, making it
easier for students to talk to someone who can help
with course issues and challenges.
This year additional one to one groupwork support
has been offered to all care experienced students.
Information sessions have been offered in all schools
around accessing the care experienced bursary and
other entitlements.
The most recent results for school leaver destinations
reported that 9.6% of care experienced young people
moved into Higher Education and 46% to Further
Education opportunities. This shows an increase in 
the number of young people accessing Further
Education settings.
Partnership working to support care
experienced young people transition to
a positive pathway at college
Increased engagement with schools, Skills Development
Scotland, Social Work and Throughcare support has led
to successful transitions to South Lanarkshire College.
This includes Q and A sessions, workshops, orientation
visits and summer support pathways.
Evidence shows that while the number of learners has
reduced over the last year (173 to 145) the percentage
of students successfully completing their college
course has increased slightly by 0.3% points.
Supporting care experienced pupils 
in schools
Because we know care experienced pupils often
have greater challenges and barriers in their learning,
extra support is provided to help them. Pupils are
supported in schools by designated senior managers
who co-ordinate any help the children and young
people might need, including supporting their
attainment and wellbeing, which is helping to make
sure they are given the same chance of success as
every other pupil.
Our schools are also working on improving the
understanding of what it means to be care
experienced and many schools have a promoted
member of staff who work as a care experienced
champion. This approach provides opportunities
for young people to talk together about their
experiences and support each other to make the
most of school. There is also a team of support
teachers who are directly helping care experienced
children who link closely with schools to give specialist
advice and advocate for care experienced children in
many effective ways.
This support has meant that more pupils are
achieving National 5 awards, fewer pupils are being
excluded from school and their attendance in school
is being maintained.
Reduced poverty amongst care
experienced people
Managing money better
All care experienced young people are supported
to budget for themselves through advocacy
support, help from the Promise Team and from
other corporate parents. Young people are offered
dedicated support including using the available
food larder, managing their savings and accessing
welfare and benefit advice through the Money
Matters Advice Service. Young people have also
benefited from an initiative called ‘Winter Wishes’
which provided one-off cash awards to help with the
additional cost of living demands between December
and February and further help was provided for
young people gaining their own tenancy.
SLC 
print proof
297

Page 298

Section four:
Our plan and its progress
24
Children’s Services Plan
2023—2024
Maximising Child Trusts Funds
Young people over 16 have been supported to
actively manage their Child Trust Fund and/or
Junior ISA savings accounts, which are currently
administered by the Share Foundation. The council
have been working with Share Scotland to identify
any unclaimed ISAs and to make sure that young
people get the financial benefits they are entitled to.
Eighteen young people took part in financial education
courses. All the young people who participated
benefited financially in some way and a total of £9,850
was provided to those completing courses. Four
young people gained £1,500 for their Child Trust Fund
as a result of their participation. In addition, a number
of contributions were made to young people’s savings
accounts/Junior ISAs. E.g. £1,500 has been added
to the account of a young person who has been
adopted, £2,430 has been added to five accounts of
young people currently in care.
Making the most of benefits advice
All care experienced young people are supported to
receive financial help in the form of awareness raising
about benefit entitlement, financial education and
budgeting. The Money Matters Advice Service meet
with young people in the Care Hub on a regular basis
and offer drop-in sessions or dedicated appointments
when needed. As a result, care experienced young
people are building their confidence with managing
their money and budgeting and beginning to access
additional entitlements.
As a result of the financial support young people have
been offered, over 70% say that they are now better
informed about financial planning as a result.
Improved lifelong support for 
care experienced people
Supporting families to stay together
As part of our approach to supporting families to stay
together where possible and develop a strong sense of
belonging, regular meetings take place with staff from
the Promise Team, Residential Services and the Family
Connections Service. The group have been analysing
available research and information about current
practice to support brothers and sisters stay in contact
when they are placed in different care arrangements.
Also, discussions have begun with young people to
gather their views on how they have been supported
to maintain relationships with their brothers and
sisters in South Lanarkshire.
Improved support into long term
housing for care experienced people
Planning for suitable accommodation for
young people
Housing and Social Work staff have been working
closely to better understand the needs of young
people moving into their first independent living
home and to make sure they are offered the best
option possible. Every young person leaving a care
situation is supported by an independent plan that
informs what accommodation is offered and the
support they get to move into their new home. Young
people have told us that this support is valuable in
helping them move into their first home.
Supporting young people in their home
We are developing a multi-agency approach to
providing care experienced young people the best
home possible to make sure that they are satisfied
with their home when they get it and are supported
to make sure it continues to meet their needs. This
includes making sure training is provided for third
sector agencies, having a clear plan to engage young
people in the process. We have recently secured
additional funding to the Big Lottery to work in
partnership with Barnardos to put in place a new
Youth Housing Support project.
SLC 
print proof
298

Page 299

25
Developing a Throughcare 
Housing Protocol
Housing and Social work have been working closely
with the Champions Board young people to develop
and implement a Throughcare Protocol, which was
launched in January 2024. The protocol will mean
that young people moving into their first tenancy will
get the right support they require at the right time.
Improved the mental health
and emotional wellbeing of care
experienced people
Online support for young people’s
mental health
As part of our work to support the emotional wellbeing
of young people, staff have been working with young
people to inform what online support is available
including digital platforms to inform care experienced
young people of the mental health supports that
are available. This helped inform the use of Kooth, a
support website that offers help, advice and access
to qualified councillors via the website. Over the last
year, 89 care experienced young people aged 18 to 26
used this support and nine of them reported that they
felt this was a useful source of support and all of them
would recommend the service.
One young person talks about the impact the
support made to them:
Blair accessed the website for support because they
wanted to find ways to communicate to their partner
in a positive and constructive way. They spoke to
a councillor who provided support on boundaries
and healthy relationships. Blair was helped to set a
goal for themselves which was ‘to talk to my partner
about how I feel.’ Blair and the practitioner spoke
about positive language to use which is less critical, to
avoid defensiveness and arguments. The practitioner
provided a supportive toolkit for Blair to access, which
included helpful resources and reading material and
they were signposted to LGBTQIA+ Youth Scotland for
further information and support.
Blair was given a safe space to explore their emotions;
their feelings were acknowledged and validated, and
Blair confirmed that they’d recommend counselling to
a friend if they ever needed support.
Reducing the criminalisation of care
experienced young people
Care experienced young people 
and offending
“Why not enable young people
to explore their own needs and make
their own decisions? With the ASK
approach care-experienced young
people identify their own absent skills
and interests, planning a programme
around this. This gives them a sense
of ownership and control. All along,
they engage because they want to –
and that’s at the heart. We put power
back in the hands of those who have
had power taken from them!” 
Former ASK Young Leader
A joint bid by South Lanarkshire Council, COVEY and
the university of the West of Scotland to the Scottish
Government’s Promise Fund to support a reduction in
the criminalisation of care experienced young people
secured £150,000 for young people to work together
through the ‘ASK’ youth justice and rights approach.
This work is being led by the young leaders and peer
researchers, and is supported by COVEY, the council
and the university. It is planned that the work will
provide better outcomes for the young people involved
and will help improve the safeguarding of care
experienced young people within their community.
An event held recently and led by the young people
introduced ‘contextual safeguarding’ as a way of
considering risk of harm outside the home for children
and young people within South Lanarkshire. The
event helped to share young people’s experience
of community and group-based violence and
challenged staff to develop support that keep young
people safe in public places, schools and peer groups.
SLC 
print proof
299

Page 300

Section four:
Our plan and its progress
26
Children’s Services Plan
2023—2024
The Harvard experience
Who Cares? Scotland’s Reaching Higher campaign
and funding from Education and NHS Lanarkshire
has helped four young people to attend Harvard
University’s prestigious Summer School over the last
two summers. All four young people have continued
onto to university where they all stated that the
Harvard experience helped them in this journey and
that they were helped to achieve their aspiration
to higher education. This support helped to support
attendance and attainment and mental health and
emotional wellbeing, which reflects our commitment
to The Promise.
Who Cares? Scotland are working with South
Lanarkshire partners to secure funding to support
young people to attend the Harvard Summer School
in the future to build on the positive experiences of
the young people who have participated previously.
SLC 
print proof
300

Page 301

Section five:
Our commitment to improvement
27
A focus on improvement is at the heart of our shared children’s services plan
activity, using the national ‘3 Step Improvement Framework’ and Model for
Improvement to inform what improvement activity we implement within this plan.
This means that all of our improvement work starts
off small, trying out ideas to see if they work before
we make wholescale changes to services or systems.
We are delighted that a number of improvement
projects have resulted in more strategic changes,
allowing us to work together with children, young
people and families for even better outcomes.
As we move forward, we are committed to maintaining
our focus on improvement as part of our shared work
and this will feature in how we work together across
the groups within our governance structure.
How will we achieve this?
T Increased focus on joint working, sharing our
knowledge and resources to deliver additional value
through the activity of the three thematic groups. 
T Commitment to an evidence-based approach
which gives particular consideration to the needs
of the families and best possible outcomes. 
T Meaningful involvement of children, young people
and families. 
T Long term, strategic thinking that aligns key areas
of policy and priorities to support a more holistic,
preventative approach.
T Robust accountability and governance across all
of working groups and through strong scrutiny
and the production of accessible annual reports.
SLC 
print proof
301

Page 302

Section six:
Moving Forward
The Getting It Right for South Lanarkshire’s Children’s
Services Partnership has a strong vision for our 
work together:
South Lanarkshire’s children, 
young people and families will be
safeguarded and supported to reach
their full potential and thrive within 
their communities.
Each of our Thematic Groups has been reflecting on
their progress around the areas for improvement over
the last year and agreeing what needs to change
(if anything) going forward. The groups are taking
into account, data gathered, successful outcomes,
problems solved, tasks completed, available resources
and above all the voice of service users. This has
resulted in the areas of work below being the ones we
will focus upon over the next 12 months:
Whole Family Approach Thematic Group
Every family that needs support gets the right family
support at the right time for as long as it is needed
Reduced number of children and young people
living away from their families
Reduced number of families requiring 
crisis intervention
Reduced inequality gap in child development
Reduced inequality gap in wellbeing outcomes 
for families’ children and young people
Achieved Breastfeeding Friendly council status
Improved whole family approaches to child 
healthy weight
Increased number of families taking up wider supports
Supporting the Child Poverty Accelerator Fund
initiative to support families with disability challenges
Health and Wellbeing Thematic Group
Every child and young person will be able to access
support which helps improve their mental health
and emotional wellbeing
Improved maternal and infant mental health
Improved support offered to children and young
people who may be at risk of suicide and self-harm
Improved whole school approaches to mental
health and wellbeing
Improved visibility and accessibility of community
mental health supports and services
Staff professional learning and development to
ensure their own and others’ wellbeing established
Keeping The Promise Thematic Group
Children and young people grow up loved, safe,
respected and listened to
Voice is at the heart of all decision-making
processes at all levels
Increased number of care experienced people
accessing further and/or higher education
opportunities and successful employment
Reduced poverty amongst care experienced people
Improved lifelong support for care experienced people
Improved support into long term housing for 
care experienced people
Improved the mental health and emotional
wellbeing of care experienced people
28
Children’s Services Plan
2023—2024
SLC 
print proof
302

Page 303

Section seven:
Wider Partnerships
29
Our children’s services partners are: most
importantly our children, young people
and families, South Lanarkshire Council,
South Lanarkshire Health and Social
Care Partnership, NHS Lanarkshire, South
Lanarkshire Child Protection Committee,
Scottish Children’s Reporter Administration
(SCRA), Police Scotland, Skills Development
Scotland, Scottish Fire and Rescue Service,
South Lanarkshire Leisure and Culture
and Voluntary Action South Lanarkshire
(VASLan) on behalf of our vibrant and
valuable third sector organisations.
As a result, our governance structure is one designed to
make the most of available resources and one that is
well placed to drive forward our agreed priorities going
forward and make a substantial contribution towards
the national priorities of the Promise, Whole Family
Wellbeing, Mental Health and Emotional Wellbeing,
Children’s Rights and Getting It Right for Every Child.
The structure shown below highlights our core
children’s services plan activity, but also has key links to
the Community Planning Partnership, Child Protection
Committee, Community Learning and Development
Partnership and the Drug and Alcohol Partnership,
where we share common priorities in achieving best
outcomes for children, young people and families.
We are committed to using our combined resources effectively to deliver services promoting
wellbeing, preventing adversity and offering the right help at the right time to those who need it.
Getting It Right for South Lanarkshire’s Children Governance Structure 2023-26
Children’s
Services
Partnership
Whole
Family
Health and
Wellbeing
The
Promise
Continuous
Improvement
Promise
Board
Champions
Board
SLC 
print proof
303

Page 304

Key Contacts
Partnership Planning Manager
Education Resources, 
South Lanarkshire Council 
Almada Street, Hamilton, ML3 0AE
Email: education.inclusion@southlanarkshire.gov.uk
Planning and Performance Manager
South Lanarkshire Health 
and Social Care Partnership 
Almada Street, Hamilton, ML3 0AE
Email: strategic_services@southlanarkshire.gov.uk
30
Children’s Services Plan
2023—2024
SLC 
print proof
304

Page 305

SLC 
print proof
305

Page 306

If you need this information in another language or format,
please contact us to discuss how we can best meet your needs.
Phone: 0303 123 1015
Email:  equalities@southlanarkshire.gov.uk
Produced by Communications and Strategy. 067312/Aug24.
www.southlanarkshire.gov.uk
SLC 
print proof
306

Page 307

Review of Children’s Services Plans 2023-2026
South Lanarkshire Individual Feedback Report
Produced by The Lines Between on behalf of the Scottish Government
Appendix 2
15
307

Page 308

1
Introduction
This report provides feedback on South Lanarkshire’s Children’s Services Plan 2023-2026. 
Context
Part 3 Section 8(1) of the Children and Young People (Scotland) Act 2014 Children and
Young People (Scotland) Act 2014 requires each local authority and its corresponding
health board to jointly prepare a Children’s Services Plan (CSP) every three years. The
CSP is designed collaboratively by specified service providers and local stakeholders, with
a view to meeting the following statutory aims:
The Children and Young People (Scotland) Act 2014 also requires the Scottish
Government, on behalf of Ministers, to review all CSPs in the year of their submission and
provide individual feedback reports to each Children's Services Planning Partnership
(CSPP). 
Review of Children’s Services Plans
In September 2023, the Scottish Government commissioned The Lines Between1 to
undertake an independent review of CSPs covering the 2023-2026 period. As part of this
commission, The Lines Between will produce the following outputs:
• A national review report providing an overview of findings from the review of
CSPs. This will highlight key themes emerging in Children’s Services Planning and
discuss areas of strength, gaps and areas for development across all 30 CSPs. 
1 The Lines Between is a social research agency with extensive experience of research, evaluation
and analysis across different sectors, including children & families services, health & social care
and education.
(a) that children's services in the area concerned are provided in the way which:
(i) best safeguards, supports and promotes the wellbeing of children in the
area concerned, 
(ii) ensures that any action to meet needs is taken at the earliest appropriate
time and that, where appropriate, action is taken to prevent needs arising, 
(iii) is most integrated from the point of view of recipients, and 
(iv) constitutes the best use of available resources, 
(b) that related services in the area concerned are provided in the way which, so far
as consistent with the objects and proper delivery of the service concerned,
safeguards, supports and promotes the wellbeing of children in the area concerned.
308

Page 309

2
• Individual feedback reports for each CSPP providing individualised feedback on
the content of each CSP, highlighting areas of good practice and areas where
further support and development is needed.
Approach to analysis
A number of expectations regarding the content, format, and process of developing a
Children’s Services Plan are explicitly outlined within Statutory Guidance on Part 3 of the
Children and Young People (Scotland) Act 20142. The requirements set out in the
Statutory Guidance have been used to develop a list of 15 key criteria, against which the
CSPs have been reviewed. A full list of the criteria is provided in Appendix A. 
This feedback report discusses each criterion in turn, providing explanatory commentary
on how the CSP addresses the criterion and where increased coverage or a stronger
articulation of the criterion would be beneficial. Each feedback report also provides a
summary of the key areas of good practice and areas where further support and
development is needed.
Where information could not be identified within a plan, this has been indicated within the
report under the relevant criterion section. There may be areas for further clarification as
the terminology, governance arrangements, and models of operational service delivery
vary significantly across Scotland’s 30 CSPPs.
Purpose of individual feedback reports
Individual feedback reports are intended to support CSPPs to consider areas of strength,
and potential areas for development, in their articulation of the local approach to Children’s
Services Planning. This aims to support CSPPs in continuous improvement activity as part
of each 3-year planning cycle. The feedback in this report is not intended as a statement
on compliance with associated legislation or assessment of standards of service delivery.
Feedback reports should therefore be considered in conjunction with learning from single
and multi-agency quality assurance and self-evaluation activity by each CSPP, together
with findings from inspection.   
2 Children's services planning: guidance - gov.scot (www.gov.scot)
309

Page 310

3
Review of South Lanarkshire’s Children’s Services Plan (2023-
2026)
The table below summarises the extent to which South Lanarkshire’s CSP has met the
criteria identified for the purposes of this review.
Criteria Fully met Partially met Not met
1. Vision ✓  
2. National Performance Framework  ✓  
3. Joint Strategic Needs Assessment  ✓  
4. Include Analysis of Data  ✓  
5. Manageable/Measurable Priorities   ✓ 
6. Children’s & Related Services  ✓  
7. Prevention & Early Intervention  ✓  
8. GIRFEC  ✓  
9. Children’s Rights  ✓  
10. Engagement & Ownership  ✓  
11. Family Support  ✓  
12. Resources  ✓  
13. Monitoring Indicators   ✓ 
14. SMART  ✓ 
15. Links to Plans & Reports ✓   
Criterion 1: Vision 
South Lanarkshire’s CSP sets out a shared vision on p. 6:
“South Lanarkshire’s children, young people and families will be safeguarded and
supported to reach their full potential and thrive within their communities”. 
A range of children’s services partners are listed, including South Lanarkshire Council,
South Lanarkshire H&SCP, NHS Lanarkshire, SCRA, emergency services, South
Lanarkshire Leisure and Culture and Voluntary Action South Lanarkshire. 
Governance arrangements for the CSPP are set out in a helpful chart on p. 6.  
The CSP has fully achieved Criterion 1. 
310

Page 311

4
Criterion 2: National Performance Framework 
The Guidance states, “it is expected that all actions, activity and initiatives are aligned with,
and seek to deliver the ambitions contained in the National Performance Framework
(NPF)”. 
A diagram of the NPF and its outcomes is included on p. 25. It is noted that the NPF has
informed the CSP’s development and formed the basis of the Joint Strategic Needs
Assessment. A range of NPF and other national level outcomes are embedded within the
CSP. 
The CSP has fully achieved Criterion 2.
Criterion 3: Joint Strategic Needs Assessment 
Section 9 (p. 24) sets out the Partnership’s approach to improvement, which involves
maintaining a Joint Strategic Needs Assessment. This clarifies that the voices of children,
families, and the wider workforce were involved in obtaining this data and shaping the
CSP and its priorities. There is some evidence that those whose voices are seldom heard
were consulted, such as care experienced children via a Champions Board.
Pages 8-12 set out a range of population, health, education and economic data on
children, young people and families in South Lanarkshire. There are clear links between
the data and SHANARRI wellbeing indicators and the actions and outcomes within the
plan. 
The CSP has fully achieved Criterion 3.
Criterion 4: Include Analysis of Data 
As noted above, pp. 8-12 set out comprehensive quantitative and qualitative data which
covers the full range of SHANARRI wellbeing indicators. The data considers the needs of
children at different stages of life and those with specific needs. For example, statistics are
provided on % of young people with mental health concerns (at different ages), % of
young people who have tried e-cigarettes, number of child protection registrations and
number of children referred to SCRA for justice proceedings.
Data has been gathered from a range of sources, including surveys, consultation,
inspection findings, audits and learning reviews.
The CSP has fully achieved Criterion 4.
Criterion 5: Manageable/Measurable Priorities 
While the CSP does not clearly identify ‘priorities’, sections on Whole Family Wellbeing
Approach (pp. 16-17), South Lanarkshire’s Promise (pp. 18-19) and Health and Wellbeing
(pp. 20-21) are all set out in a uniform structure, with headings on: ‘Why is it important?’,
‘Where are we now?’ and ‘What will we do next?’ - these could be interpreted as the
CSP’s priorities. 
311

Page 312

5
Each section discusses the rationale behind the selection of the priority (including relevant
data and the views of children and young people), the services and actions addressing the
priority and intended outcomes. However, the CSP does not include clear monitoring
indicators to measure progress against the priorities; these would be required to fully
achieve this criterion. 
The CSP has partially achieved Criterion 5.
Criterion 6: Children’s & Related Services 
A Children’s Services Plan is intended to provide a narrative of local services offered and
planned action to safeguard, support and promote wellbeing, with a focus on prevention
and early intervention. South Lanarkshire’s Plan refers to both children’s services and
related services, and sets out actions being taken to support the workforce.
The children’s services mentioned include maternity services, the roll-out of the national
Universal Health Visiting Pathway, early years/childcare services, schools and education,
youth work, children’s social work and mental and physical health services. 
A wide range of related services are also discussed. These include: housing and finance
support for care experienced young people; targeted employability support through a
youth employability service Aspire; and the Alcohol and Drugs Partnership services for
children, young people and families with substance use issues. The CSP also highlights
the needs of children with parents in the armed forces and support and legislation in this
area (p. 28). 
The CSP has fully achieved Criterion 6.
Criterion 7: Prevention & Early Intervention 
A clear commitment to early intervention and prevention is stated on p. 6 and is reflected
throughout the CSP, with recognition that such approaches are key to successful
outcomes for children and young people (p. 26). A focus on accessible supports and
asset-based approaches supports this goal; these cover all aspects of wellbeing (across
SHANARRI). 
The CSP has fully achieved Criterion 7.
Criterion 8: GIRFEC 
The GIRFEC approach is clearly embedded throughout the CSP. It is noted that GIRFEC
and the supporting National Practice Model provide guidance to help South Lanarkshire
children’s services deliver proportionate and timely support. A useful diagram on p. 26
describes the GIRFEC model, with references to the resilience matrix, the My World
Triangle and SHANARRI indicators.
In addition, third sector services have been commissioned to provide wellbeing support for
children and staff and focused support through the Trauma Recovery Service. ASIST and
trauma-informed training has also been delivered to staff. 
312

Page 313

6
The CSP has fully achieved Criterion 8.
Criterion 9: Children’s Rights 
It is clear that children's rights and the UNCRC have been taken into account in the
development of the CSP. Children’s views are emphasised throughout the plan, with
Section 4 dedicated to children’s rights, engagement, and participation. Examples of how
South Lanarkshire has promoted children’s rights and participation include:
• The Let’s Connect Conference
• Launch event for South Lanarkshire’s Youth Strategy
• Champions Board
The CSP has fully achieved Criterion 9.
Criterion 10: Engagement & Ownership 
The voices of children, young people and parents were central to the development of the
CSP; over 16,000 children and young people were supported to give their views and
opinions on services via a wide range of processes (p. 11). Some innovative methods
were used, such as the ‘Mind of My Own’ app, to help care experienced children and
young people share their views and experiences with staff and a Facebook ‘Closed User
Group’ consultation as part of the Scottish and World Breastfeeding Week events (p. 14). 
Page 15 sets out the views of children and young people gathered through engagement
activity; it is clear that the views of a variety of stakeholders have contributed to the
development of the plan.
The CSP has fully achieved Criterion 10.
Criterion 11: Family Support 
South Lanarkshire identifies Whole Family Wellbeing as one of three key pillars for
achieving the best outcomes for families (p. 4). Whole Family Wellbeing has its own
dedicated section (pp. 16-17), which describes a focus on developing preventative
approaches and a ‘no wrong door’ policy. A range of supports and services are set out
from birth onwards, e.g. a schools-based family project called Pathfinders to reduce the
need for more complex intervention later. 
The Whole Family Wellbeing Fund is being used to develop Family Support Hubs, employ
peer support workers and early years workers, and set up a Family Group Decision
Making project (p. 17)
The CSP has fully achieved Criterion 11.
Criterion 12: Resources 
Page 6 details the total 2022/23 budget for each of the following services: education,
health, social work and the third sector. In addition, some specific funds are also
313

Page 314

7
highlighted; these include Care Experienced Children and Young People Attainment Fund
and Whole Family Wellbeing Fund. 
Confirmation is given that resources are being directed towards prevention (p. 16).
The CSP has fully achieved Criterion 12.
Criterion 13: Monitoring Indicators 
Page 24 sets out 'Our approach to improvement', which states that an approach of
continual improvement has been adopted in South Lanarkshire. A Continuous
Improvement Group exists to provide an overview of quality assurance activity, informed
by the Partnership’s self-evaluation and external scrutiny. 
While the priority areas have outcomes attached (e.g. ‘Reduce the number of families
taking up wider supports’), the CSP does not identify clear monitoring indicators to
measure progress against the priorities; these would be required to fully meet this criterion.
Integrating the Scottish Government’s Children, Young People and Families Outcomes
Framework (CYPF OF) Core Wellbeing Indicators into the CSP’s monitoring and
evaluation approach would be best practice. 
The CSP has partially achieved Criterion 13. 
Criterion 14: SMART 
The CSP is well presented, with effective use of colour, photographs and diagrams
throughout. It is a reasonable length (32 pages), but would benefit from the inclusion of a
one-page summary. Information on how to access the document in different formats, e.g.
large print, audio or different languages is provided on the last page.  
In terms of the SMART principles, the priorities and actions are: Specific, Achievable and
Relevant; however, they are not Measureable or Time-related. Clear timescales and
monitoring indicators attached to the actions and priorities would be required to fully meet
this criterion. 
The CSP has partially achieved Criterion 14.
Criterion 15: Links to Plans & Reports 
A wide range of local and national plans/frameworks are referenced throughout the CSP,
including South Lanarkshire’s Community Plan. A useful summary of the local Sustainable
Development and Climate Change Strategy is also provided. 
The CSP has fully achieved Criterion 15. 
Areas of strength 
South Lanarkshire’s CSP is high quality, ambitious and informative. Key strengths include:
detailed explanations of governance and policy contexts; clear and robust examples of
stakeholder engagement and involvement; a strong section on children and young
314

Page 315

8
people’s rights; clear data on children, young people and families; and excellent use of
design features e.g. colour, photographs and infographics.
Areas for further development 
Few areas have been identified for improvement; these largely relate to the lack of clear
monitoring indicators attached to the priority areas. The inclusion of clear and specific
progress measures and timeframes for the actions/targets would enhance the plan. 
Next Steps 
There is no requirement to provide an update to the Scottish Government in response to
the feedback provided in this report. However, should any CSP Strategic Leads find it
helpful to discuss any aspect of their CSPP’s feedback, please get in touch via:
ChildrensServicesPlanning@gov.scot 
315

Page 316

9
Appendix A: Statutory review criteria 
Does the Children’s Services Plan….
1. Have a clear, ambitious compelling shared vision of what will be achieved by the end of the plan?
2. Reflect relevant National Performance Framework Outcomes?  
3. Incorporate a robust evidence-based joint strategic needs assessment of the current population of
the children and young people in its area? 
4. Include analysis of quantitative and qualitative evidence and data relating to both service
performance and child wellbeing? 
5. Identify a manageable number of measureable priorities clearly linked to the joint needs
assessment to ensure that the rationale behind the priorities is explicit? 
6. Cover local services which fall into the categories of both ‘children’s services’ and ‘related
services’ in its scope? 
7. Recognise and describe services which can fulfil both ‘primary prevention’ and ‘early intervention’
across all aspects of wellbeing? 
8. Describe how the Children’s Services Planning Partnership is creating and maintaining effective
Getting It Right for Every Child practice for individual children, young people and their families? 
9. Describe how the Children’s Services Planning Partnership is using children’s rights to inform the
structural, procedural and outcome framework of the plan? 
10. Convey a shared sense of ongoing engagement and ownership with staff, children, young
people, families and the wider community, evidencing that the Children’s Services Planning
Partnership has made full use of stakeholder’s ideas and suggestions? 
11. Set out a comprehensive strategy for supporting families through a broad range of preventative
and early intervention approaches from universal services to targeted intensive support and
describe the rationale for how and where the family support services are provided? 
12. Describe what services are going to be developed in the future and specifying which areas will
see disinvestment in order to facilitate the shift of resources towards preventative and early
intervention options? 
13. Set clear indicators for monitoring and evaluating the effectiveness of children’s services in
terms of their success in responding to and addressing children’s wellbeing needs? 
14. Present all the information in an easily accessible format which is SMART (Specific, Measurable,
Achievable, Relevant and Time-related)? 
15. Illustrate links (or incorporation) of other statutory plans and reports? 
316

Page 317

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Executive Director (Education Resources)  
Subject: Local Child Poverty Action Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the committee on the content of the South Lanarkshire Child Poverty Action
Report for 2023/2024
[1purpose]
2. Recommendation(s)
2.1. The committee is asked to approve the following recommendation(s):- 
(1) that the progress in developing the Child Poverty Action Report 2023/2024 be
noted. 
3. Background
3.1. The Child Poverty (Scotland) Act 2017 introduced a new requirement for local
authorities and relevant health boards to prepare a Local Child Poverty Action Report
(LCPAR) as soon as reasonably practicable after the end of each reporting year. 
3.2. The purpose of the LCPAR is to describe any measures taken in the area of the local
authority during the reporting year and planned activity for the year ahead that seeks
to address and mitigate child poverty. 
3.3. The work described in the report is expected to contribute to the four national income-
based child poverty reduction targets to be achieved by 2030:- 
(1) less than 10% of children are in relative poverty
(2) less than 5% of children are in absolute poverty
(3) less than % of children are in combined low income and material deprivation 
(4) less than 5% of children are in persistent poverty 
3.4. The Scottish Government made it clear that the introduction of the requirement to
produce a LCPAR signals an imperative to undertake new activity and a new approach
to tackling child poverty; effectively a step-change in tackling child poverty. Where
local partners are continuing with existing activity, they should be clear about the
supporting evidence base indicating its effectiveness. 
3.5. Feedback on South Lanarkshire’s LCPAR from the Improvement Service continues to
be overwhelmingly positive.  
16
317

Page 318

3.6. South Lanarkshire Council and NHS Lanarkshire agreed at the Community Planning
Partnership Board meeting of the 6 June 2018 to produce a single LCPAR, recognising
a collective effort would be more effective. 
3.7. The Child Poverty Working Group, established in 2018, continues to be the main
mechanism used to produce the report. This group meets at least on a quarterly basis
to ensure that the work around the report remains relevant and focussed on the key
actions to address child poverty in South Lanarkshire. 
4. Scope of the Report
4.1. Child poverty is caused by a complex blend of structural issues relating to macro-
economic and political factors governing the labour market, employment and social
security. Social factors make particular groups especially vulnerable to poverty, e.g.
children, lone parents, disabled people and Black & Minority Ethnic (BME) groups. 
The following diagram from the Scottish Government provides an overview of what its
research indicates are the main drivers of child poverty. 
4.2. One area for improvement is the information gathered from those with lived experience
of poverty. This has been key in identifying actions for the partners to develop
however, we can be much better at supporting partners engage with families and
communities in developing future actions. 
5. The Report and Ongoing Activity
5.1. The LCPAR for 2023/2024 is attached as an appendix and highlights a range of work
delivered across South Lanarkshire to address poverty challenges faced by families.
The report reflects the aspirations of the Child Poverty Commitment and seeks to
reflect the oversight of this work going forward and how it is embedded in much of
what we do across a wide range of planning and delivery processes. 
5.2. As the planning evolves and resourcing and capacity allows, partners will continue to
focus on areas for improvement, identified by the working group and from engagement
processes. 
5.3. Partners will continue to monitor challenges which may arise to mitigate an increase
in child poverty, ensuring any new evidence and research informs our shared work
and decision making.   
5.4. As part of the partners approach to developing activity, listening to the voices of
families and communities experiencing poverty issues will be crucial and be a feature
of future design of services. 
318

Page 319

5.5. The work to establish a Neighbourhood Plan for East Kilbride South has the voice of
children and families at its heart and includes the additionality of a child poverty lens
informing developments. This work informed a bid to the national Child Poverty
Accelerator Fund (CPAF) to test an ‘Ask Once’ model of service delivery. 
5.6. In 2023, partners were successful in a joint bid to CPAF to develop an initiative to
support families where a child or young person has a disability. This test of change is
being delivered by COVEY on behalf of our local partnership and learning from this
work with be shared locally and nationally as part of this work. 
6. Employee Implications
6.1. There are no immediate employee implications arising from this report. 
7. Financial Implications
7.1. Any financial implications will be met within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no immediate climate change, sustainability or environmental implications. 
9. Other Implications
9.1. The LCPAR continues to be a point of local and national scrutiny. This could have
positive and/or negative impact on perceptions of the Council and its partners, and a
proactive PR approach is required. South Lanarkshire’s report continues to be viewed
very favourably.   
10. Equality Impact Assessment and Consultation Requirements
10.1. As the new LCPAR is a reporting duty, a new Impact Assessment is not required. 
11. Children’s Rights Considerations
11.1. As there is a high poverty/child poverty focus in the work in East Kilbride South, a
Children’s Rights Wellbeing Impact Assessment will be completed as part of the work
to develop the local Neighbourhood Plan. 
11.2. Engaging children, young people and families in developing this work is central to our
continuing commitment to the UNCRC and in particular the following Articles:-
 Article 6 (life, survival and development) every child has the right to be kept
safe from harm, the right to be alive, survive and develop through life
 Article 12 (respect for the views of the child) every child has the right to
express their views, feelings and wishes in all matters affecting them, and to have
their views considered and taken seriously. 
 Article 13 (freedom of expression) every child must be free to express their
thoughts and opinions and to access all kinds of information, as long as it is within
the law
 Article 27 (adequate standard of living) every child has the right to a safe place
to live, food and clothing 
Carole McKenzie
Executive Director (Education Resources) 
23 October 2024  
319

Page 320

Link(s) to Council Values/Priorities/Outcomes
 Education and learning: inspiring learners, transforming learning, strengthening
partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kevn Mullarkey
Children’s Services Partnership Planning Manager, Education Resources, South Lanarkshire
Council 
Floor 13, Almada Street, Hamilton, ML3 0AE
Email: education.inclusion@southlanarkshire.gov.uk 
320

Page 321

Providing the best start
and brighter future for
children, young people
and families in 
South Lanarkshire
South Lanarkshire’s 
Joint Local Child Poverty 
Action Report
2023—2024
SLC 
print proof
16
321

Page 322

South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
322

Page 323

Content section
3
Section 1. Foreword 4
Section 2. The current context 6-7
Section 3. Our plan and its progress 
•  Income from benefits 8-13  
•  Cost of living 14-22  
•  Income from employment 23-27
Section 4. Monitoring of progress and 
delivering on our ambitions  28-29
Section 5. Our priorities for 2024/25  30
SLC 
print proof
323

Page 324

Section 1 - 
Foreword
Community
Wealth Building
Strategy
Local Child Poverty
Action Report
Economic
Development
Strategy
Local
Employability
Partnership
Child Health Plan Children’s
Services Plan
Local Housing
Strategy
Community Plan/
Neighbourhood
Plans
Connect 
(Council Plan)
Tackling 
Child Poverty
Community
Learning and
Development
Partnership
4
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
Welcome to South Lanarkshire’s 2024 Local Child Poverty Action Report. 
As a partnership of many statutory and non-statutory agencies our shared
aim is to support families manage increasing financial challenges and work
together to identify what more we can do to make things better for families
financially. Our report reflects our work over the past 12 months and what we
have been able to do to support families cope with the current cost of living
challenges and also how we look to improve that support moving forward.
We know many children and families continue to
experience poverty in their lives to some degree and
often face difficult financial choices on a day-to-day
basis. This often restricts opportunities for families in
many important areas of life, having a detrimental
impact on health, participation in education and poor
housing conditions. It can also have an adverse effect
on families’ involvement in our communities, pursuing
hobbies and interests, or being able to experience a
holiday as a family.
Our aspiration for families continues to be that they
experience the best start in life and achieve the best
possible outcomes in health, education, employment
and feel safe and engaged in the communities where
they live. To support this aim, our partners work with
families and local communities to identify practical
solutions to the things that can bring real change for
the better in people’s lives.
Working to mitigate child poverty and poverty in
general is unlikely to be achieved in isolation. Across
South Lanarkshire we are taking a practical approach
where actions to address poverty are embedded
in all that we do. The diagram below explains the
connections across the various processes to tackle
poverty and reduce its impact on children, young
people and families.
SLC 
print proof
324

Page 325

Cllr Joe Fagan
Leader of South
Lanarkshire Council Martin Hill
Chair of NHS
Lanarkshire Board
Taking a whole family approach to tackling poverty
and improving wellbeing is essential to achieving the
best possible outcomes for families. To successfully
achieve a sustained reduction in child poverty and
break its damaging cycle, we work with partners
to provide the sustained and holistic support that
families need to improve their wider wellbeing and
facilitate improved life chances.
We will continue to use the ‘key drivers of poverty
reduction’ as our organisers for this work:
	
T Income from social security and benefits
	
T Cost of living, and:
	
T Income from employment
The foundation of our work continues to be built upon:
	
T Providing the right opportunities and integrated
support to parents and young adults to enter and
sustain progress in work
	
T Supporting families to live dignified lives with their
basic needs met, and:
	
T Doing everything we possibly can, to ensure our
next generation thrives
We firmly endorse our child poverty commitment that:
‘We will provide support to South
Lanarkshire’s families in order to tackle
child poverty head on, through an offer
of the right support, at the right time and
delivered in the right way.’
Moving forward, our work will be guided by the three
main drivers to address poverty and we will work
with families to deliver support differently and more
effectively where we can.
The following commitments underline this approach:
	
T We will make sure any policy development
and future service delivery is influenced by the
voice of children, young people and families
experiencing poverty
	
T Our third sector and voluntary organisations
with their strong links to communities will be
more involved at all levels
	
T We will use available data to improve our
shared understanding of the impact of
poverty at household and locality level
	
T We will seek to deliver holistic, wraparound
services which are as accessible as possible to
families experiencing poverty.
	
T We will work to eliminate stigma connected
with child poverty and financial struggles
	
T We will use our combined resources effectively
to ensure we deliver services which promote
wellbeing, prevent adversity, and provide the
right help at the right time to those who need it
	
T We will report on agreed short, medium and
long-term outcomes
As part of this continued step change journey, 
South Lanarkshire’s Commitment to tackle child
poverty is closely aligned to the national delivery plan
on tackling child poverty ‘Best Start Bright Futures’.
These in turn are linked to our 2023/26 Children’s
Services Plan and the wide range of strategies and
plans that are shown in the diagram above. At the
centre of all of this is the voice of our children, young
people and families which drives our planning and
delivery processes.
Lastly, we wish to thank all the partners and staff
from our statutory, voluntary and community sectors
who are committed to making things better for our
families. The commitment and dedication to enable
families to achieve best possible outcomes is very
much a crucial factor in our success.
5
SLC 
print proof
325

Page 326

Section 2 - 
The current context
The Scottish Government has placed
a great deal of emphasis on the role
that the new Social Security Scotland
benefits system will play in lifting and
keeping children out of poverty. The
Child Poverty Delivery Plan 2024/25
annual report estimates that the
Scottish Child Payment alone will help
keep 60,000 children out of relative
poverty in Scotland over the coming
year. This would equate to around
3,500 children in South Lanarkshire.
Targeted benefits, such as the Scottish Child Disability
Payment and Best Start Foods/Best Start Grants,
enjoy higher rates of uptake in South Lanarkshire
when compared to the Scottish average. The latest
uptake figures for Scottish Child Disability Payment
indicates that 1,645 children with a disability in
South Lanarkshire benefited from the new payment,
above the Scottish average, while 18,380 successful
applications were made by parents/prospective
parents for Best Start Grants/ Best Start Foods, again
above the Scottish average.
Most recent information shows that South Lanarkshire
parents have received a total of £27.7 million in Scottish
Child Payments since the introduction of the benefit in
2021 (6% of the Scottish total payments), while parents
with disabled children have received a total of £28.5
million through the Scottish Child Disability Payment
(7% of total Scottish payments), This is higher than
would be expected compared to other authorities
and the areas share of the national population.
The most recent figures available would suggest that
just under a third of all children, or 17,530 in South
Lanarkshire are currently in receipt of the Scottish
Child payment, just below the Scottish average.
We are aware that there are increasing incidences of
children being affected by homelessness situations
across South Lanarkshire. The number of families
experiencing homelessness continues to increase
and over the last year 305 families experienced
temporary accommodation situations at some point
compared to 245 the previous year.
The latest figures on School Leavers Destinations
indicate that the gap between school leavers from the
most deprived communities in South Lanarkshire and
the least deprived communities, entering a positive
destination on leaving school (for example, entering into
employment, further/ higher education or training) has
closed to just 2.9%, an improvement on the previous
year and better than the Scottish average gap of 3.7%.
The percentage of care experienced young people
entering a positive destination on leaving school, has
increased over the previous year to 92.9%, the highest
level ever recorded and 4.6% above the Scottish
average of 87.9%.
Breastfeeding is widely recognised as the most
complete form of nutrition for babies. The former
UNICEF Executive Director stated that “breastfeeding
is a natural ‘safety net’ against the worst effects
of poverty”. More babies across South Lanarkshire
are now being breastfed and being given the best
possible start in life as a result of a range of initiatives.
The most recent data shows that South Lanarkshire
has a breastfeeding initiation rate of 57.1%, with
over 38% of babies still being breastfed by the time
they are eight weeks old. This represents a welcome
steady increase in breastfeeding since 2017.
This data reflects our understanding that children,
young people and families, and the agencies that
work alongside them, are living and operating in an
environment where the cost of living is having an
adverse impact on many families. Increases in the cost of
fuel and food mean that many family budgets are under
pressure to meet the essential costs. As a result, we
are seeing a rise in the number of families seeking help
from our council benefits advice service Money Matters
and the Citizen Advice Bureau. We are also seeing
an increase in referrals for help to local community
foodbanks and groups and organisations such as
Healthy Valleys, Community Links and the Machan Trust.
Continued challenges across public sector funding
create uncertainty over available resources and capacity
to support families going forward and inequalities within
communities continue to be a concern. We know that
some groups are affected more than others by this,
including the priority groups identified below:
	
T one-parent families
	
T a household where someone is disabled
	
T families with three or more children
	
T minority ethnic families
	
T families with a child under one year old
	
T families where the mother is under 25 years of age.
In addition, we know that care experienced people
are directly impacted by these changes in a
disproportionate way.
6
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
326

Page 327

We bear all of these groups in mind when writing this
report and when we are planning how we can use our
available resources to best support families.
As part of our Child Poverty Commitment, we are
focussed on improving services for families where we
can and have identified some key areas where we
will do this. Our Commitment maps out our approach,
and we will report on our progress on an annual basis
as part of our reporting duty, but more importantly
as part of our accountability to our children, young
people and families.
Our work on child poverty does not happen in
isolation and the national delivery plan “Best Start,
Bright Futures” identifies targeted resources such
as the Scottish Child Payment and other financial
support. It also details funding streams such as the
Whole Family Wellbeing Fund, which is being used
to increase help and support to children, young
people and families earlier and in a more joined up
way, for example, through the four newly established
local Family Hubs, Pathfinders initiative and in the
delivery of early parenting support. We have also
been successful in bidding into the Child Poverty
Accelerator Fund and have been able to implement
a test of change aimed at supporting families who
have a child or young person with a disability.
Our pledge is to make sure that these resources are
best used to create a meaningful change in the way
we plan and deliver services and support to make
a difference to the lives of children, young people
and families in South Lanarkshire. This includes
working towards the national aim of 5% of our spend
on health and social care being on preventative
measures by 2030.
South Lanarkshire’s Community Plan and the Council
Plan ‘Connect’ share the vision of improving the life
chances of everyone in South Lanarkshire. All the
partners involved locally are working to make sure that
we are supporting families as best we can to overcome
the impact of poverty, learning together about what
works best, and acting sustainably to support our
communities and our environment for the future.
Our work on neighbourhood planning with
communities who are facing the greatest inequalities
and are supported to deliver their own priorities
is very much part of this vision. Much of this work
involves children, young people and families in very
practical ways, helping people support each other
and making sure that available resources are used to
the best effect in our communities.
Examples of this work are included within this report,
and we continue to recognise the importance of
community led activity in shaping our services and in
making sure that we do all we can do to help improve
the lives of children, young people and families
throughout South Lanarkshire.
United Nations Convention on
the Rights of the Child (UNCRC)
All Children and young people in Scotland, under
the age of 18, have protected rights under The
United Nations Convention on the Rights of the Child
(Incorporation) (Scotland) Act 2024. This requires all
Scotland’s public authorities to take proactive steps
to ensure the protection of children’s rights in their
decision-making and service delivery and makes
it unlawful for public authorities, including NHS
Lanarkshire and South Lanarkshire Council, to act
incompatibly with the UNCRC. As a partnership we are
committed to upholding children’s rights and reporting
on our activity. Key actions will include assessing current
compatibility, ensuring children’s voices are listened to
in relation to decisions that affect them, implementing
a new child friendly complaints procedure and
developing more child friendly information.
7
SLC 
print proof
327

Page 328

Section 3 - 
Our plan and its progress
This section provides highlights of the work undertaken in relation to each of our priority themes:
Driver 1:
Progress on increasing income from benefits
Case Study –
Clydesdale 
Citizen’s Advice
Clydesdale Citizen’s Advice worked with a single
parent of two children 15 and 17 with significant
health issues that meant that she could not work.
The parent was in receipt of Universal Credit, 
Adult Disability Payment for herself, as well as
Scottish Child Payment and Child Benefit for one 
of her children.
One of the children had been in and out of hospital
with health problems, while the other had left
school recently and had not secured a positive
destination yet. The circumstances had put severe
pressure on the household income, not helped by
the reduction in benefits due to the older child
leaving school.
As an initial response to the crisis, Citizen’s Advice
made a referral to the Clydesdale Foodbank for an
emergency food parcel and fuel vouchers for the
family. The adviser offered the parent the option of
contacting Routes to Work South (an employability
project) and the local careers office for the
older child, in order to get support for securing
employment or accessing or training.
The parent was unaware of the help available for
her child to secure work/ training and was grateful
from the information given. The parent was also
grateful for the food parcel and fuel voucher as 
this provided immediate help to the problem of 
not being able to feed her children or to heat 
her home.
Support from the 
Citizen’s Advice
The four Citizen’s Advice offices across South
Lanarkshire have played a vital role in helping families
with cost-of-living challenges over the past year. 
They have supported a record number of 2,875
families receive benefits advice, an increase of around
two thirds compared to the previous year. In addition,
718 families have benefited from a Financial Health
Check, an increase of more than 50% compared 
to last year.
As part of support to families, Citizen’s Advice
successfully helped 139 families secure a Scottish
Welfare Fund payment, almost double the number
supported in the previous year. Around two thirds of
the applications made were used to help cover food
and energy payments. Overall, families received over
£1.2 million in unclaimed benefits and financial gains
during 2023/24, an increase of 29% compared to the
previous year.
8
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
328

Page 329

Case Study – 
Citizen’s Advice
supporting refugees
The parent was referred to Clydesdale Citizen’s
Advice by her Midwife as part of the routine
enquiry approach. The parent had lived in Scotland
for six years, was Turkish, and had refugee status.
She was pregnant with her second child, her
husband only worked part time and was in receipt
of Universal Credit to top up the family income.
The client was also in receipt of the Scottish Child
Payment and Child Benefit for her first child.
The adviser completed a Best Start Grant
application and Best Start Food application online
with the parent and explained how the Best Start
Foods and Best Start Grants scheme worked, and
how much it was worth weekly now and when the
baby was born.
The adviser also completed an application on
behalf of the family for a Baby Box and ran through
the details of the benefits of this. The parent was
advised to come back once her baby was born in
order to carry out a further benefit check, to reflect
her new circumstances and to ensure that she was
claiming all she was entitled to. As a result, the
family benefited from a financial gain of £3,808.
The parent was also confused as to how to fill
in the maternity certificate due to her limited
understanding of the application process, but
because of the support provided by the advisor, she
was able to understand the schemes and how they
worked better.
The parent was very relieved that she was able
to come and get the full support of Citizen’s
Advice, which helped reduce the confusion and
apprehension that she initially felt when she came
into the Bureau.
Money Matters Advice Service
South Lanarkshire Council’s dedicated Money Matters
Advice Service supported 2,673 families over the last
year, a small decrease on the 2,752 from the previous
year, however the level of need of individual families
being referred, appears to have increased. Through
the help of Money Matters, families have benefited
from an additional £5.58 million in financial gains. This
included over half a million pounds in debt that was
written off during the same period, a 60% increase
on the previous year. Asking for help to manage debt
issues has increased substantially over the last 12
months. The total debt dealt with for families was
£3.55 million, a 56% increase on 2022/23.
Money Matters helped with 711 welfare benefit cases
that related directly to children or young people,
including maternity benefits, that generated £1.61
million in financial gains, including 186 Scottish Child
Payment cases, 143 Child Benefit/Child Tax Credit,
164 Child Disability Payment, 89 for Best Start
Grants/ Best Start Foods, and 17 for Free School
Meals/ Clothing Grants.
The Money Matters Community Wellbeing Team also
made nearly 1800 referrals for emergency energy
vouchers for families an increase of nearly a quarter
and over 500 foodbank referrals, which is almost
double the previous year. The ‘Cash First Scheme,’
that gives people £50 cash payments when they
are experiencing food or fuel poverty, was launched
in October 2023 and since then 631 payments were
made to families.
9
SLC 
print proof
329

Page 330

Case study – 
Money Matters 
Advice Service
Money Matters supported a lone parent with three
children aged under six. The parent requested a full
benefit check as she was struggling financially and
wanted to know if she was entitled to any other benefits.
The adviser completed the benefit check with the client
to identify that she was initially in receipt of Universal
Credit for herself and two of her children, Child Benefit
and the Scottish Child Payment for the first two children.
On querying why she did not receive Child Benefit and
Scottish Child Payment for the other child, the parent
advised that she could not claim any benefits for the
additional child due to the ‘two child restriction.’
The adviser assisted in submitting claims for Child
Benefit and Scottish Child Payment for the additional
child and further identified that the youngest child
was autistic and not in receipt of a disability benefit.
An additional application was made for Child
Disability Payment (unaffected by the two-child
restriction). The Child Disability Payment application
was successful, being awarded at the high rate
and the adviser also identified that the parent was
entitled to Carers Allowance, which was also awarded.
As a result of the support offered, the family’s
household income increased by over £370 per week.
This allowed more financial freedom to meet housing,
heating and food costs as well as provide for her,
including more money for activities and wellbeing.
The parent fed back that the resulting increase in
income was “life changing” for her and her family.
Expanding the Routine
Enquiry approach
Young mothers under 25 and families with children
under the age of one, have both been identified
by the Scottish Government, as two of the family
types most at risk of experiencing child poverty. The
Routine Enquiry of Finances approach is now a well-
established practice in South Lanarkshire, where NHS
maternity and health visiting staff can refer pregnant
women or new mothers deemed most a risk of
poverty onto local money advice services.
During the last year 808 referrals were made to
Money Matters by NHS staff. Through the help given
families have benefited from £667K in financial gains,
having a substantially positive impact on their lives.
As part of this work NHS Lanarkshire employed a
Health Improvement Senior and commissioned a
part time Money Advisor from Money Matters to
build capacity around routine enquiry and workforce
development across the organisation.
During this period 174 NHS Lanarkshire staff received
training, of which three staff teams received an in-
depth routine enquiry session, which they are now
implementing in practice. The team have also attended
13 events, engaging with staff, patients and carers to
provide advice, signposting or directing referrals for
financial support. Although not always specifically
targeted at child poverty priority groups, many of
individual staff members or patients supported
have had parental or other caring responsibilities for
children and they have been supported to maximise
their income in an NHS setting, where they may not
otherwise have reached out for help.
NHS Lanarkshire South
Family Nurse Partnership
The NHS Lanarkshire Family Nurse Partnership
Programme is a programme designed to support first-
time young mums and their families, aged 19 and under,
who are pregnant with their first child. The evidence
based programme provides support to families to break
intergenerational cycles of poor outcomes and this
support, delivered by nurses helps to:
	
T Improve pregnancy and birth outcomes;
	
T Improve child health and development and
readiness for school; and
	
T Improve parents’ capacity.
Section 3 - 
Our plan and its progress
10
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
330

Page 331

Support is provided from early pregnancy until the baby
is two years old and the unique relationships built over
this time, allows a safe space for sensitive conversations
on a variety of topics. Financial worries is a common
concern, often cause by the change in circumstances.
Glasgow Royal Hospital 
for Children Project
A financial advice service has been provided for
parents with children on location at the Royal
Hospital for Children in Glasgow for a number
of years and has been celebrated as a model of
effective partnership working. Over the last year
28 families with children who have disabilities from
South Lanarkshire were referred to the Money Advice
Service Glasgow. Through the intervention, more than
£212K in financial gains were secured for the families,
an increase of 9% on the gain in the previous year.
Young Patient’s Family Fund
The Young Patient’s Family Fund is a Scottish
Government fund to help families with the costs of
visiting and providing essential care that supports
the health and wellbeing of their child whilst in
hospital. The fund works to remove some of the
financial barriers for families visiting a baby, child
or young person in hospital. Parents and siblings
can reclaim expenses for travel, food and overnight
accommodation costs associated with visiting a child
under 18 years old in hospital.
To encourage uptake of the fund, NHS Lanarkshire
staff have made information available through social
media platforms, and within staff newsletters and
briefings, to ensure staff on site are aware of the fund
and how to help families access it.
In 2023/24 NHS Lanarkshire paediatric and neonatal
units received funding, which meant 20 families
from South Lanarkshire were able to make claims via
the paediatric unit and were reimbursed a total of
£6,907.86. Additional monies were used to support
families via the neonatal unit.
Family Nurse Partnership
Case Study – 
Using Routine Enquiry
approach to support
young mothers
In early pregnancy a young expectant mum aged
18, enrolled in the Family Nurse Partnership. The
mum engaged with her family nurse throughout
her pregnancy and the birth of her child. She was
initially in a joint tenancy with her partner but
due to relationship issues left the home and was
staying with a family member, she registered as
homeless with the council and was waiting to be
assessed for suitable accommodation.
The parent had been experiencing relationship,
tenancy and financial issues and her family nurse
was able to support her to navigate the housing
and benefits system to secure a stable home for
herself and child and maximise her income.
This support included help with changing Universal
Credit circumstances, including adding the child
element to her claim and making a claim for 
child benefit.
The parent was also supported to contact 
Social Security
Scotland to make
an application for
Best Start Grant and
the Scottish Child
Payment and will
further be supported
to apply for a single
adult council tax
reduction via the
local authority when 
her own tenancy 
is sustained.
11
SLC 
print proof
331

Page 332

GP Community Link Worker
Programme/ Financial
Wellbeing Providers
The programme is aimed at helping primary
care teams support people to live well in their
communities. A worker engages directly with
parents who are experiencing challenges affecting
their health and wellbeing and helps them access
additional support. As part of the approach by the
Link Workers, referrals are made to Citizen’s Advice
and Money Matters. Any parent that discloses
financial, debt or benefit worries can be referred onto
these support services.
Over the last year 1,642 referrals were made by
Community Links Workers, a 153% increase on the
number referred the previous year, with almost 9 in 10
families continuing to engage with staff after initial
referrals. As a result of this support, families have
benefited from additional income of over £563K.
Case Study -
Community Link
Worker support
A lone parent with three children, one of whom
has additional support needs was referred to
the Community Link Worker by the GP. The
patient was experiencing financial pressures and
struggling to find enough money to purchase food
for her family. The parent also disclosed she has
some debt, which she is struggling to pay back.
The worker made an urgent referral for
emergency food provision and also signposted
the parent to the council to make an application
to the Scottish Welfare Fund. The worker also
referred the parent to Money Matters for benefits
advice to ensure income is maximised and
recommended the patient approach the Citizen’s
Advice to discuss and devise a debt repayment
plan. The link worker also suggested making an
application for Child Disability Payment due to the
ongoing costs and support required to care for the
child with additional support needs.
The parent was very grateful for the help she had
received and explained that she had applied
and received a community care and crisis grant,
she had also received an emergency food parcel.
The parent also shared
that following the benefit
check, she had made an
application for an Adult
Disability payment and
was awaiting a
decision from
Social Security
Scotland.
Section 3 - 
Our plan and its progress
12
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
332

Page 333

Social Security Scotland
benefits and actions
Since the introduction of the Scottish Child Payment
in 2022, just under 20,000 children in South
Lanarkshire have benefited from the new payment,
this represents more than a third of the population
under the age of 16 and just below the Scottish
average. Over 7,000 of these children, live in the 20%
most deprived communities.
South Lanarkshire families have received almost
£25 million in benefits through the Scottish Child
Payment, since the payment was introduced, around
6% of the total Scottish payments.
The Scottish Child Disability payment was established
in 2023, to provide extra support to families with
disabled children under the age of 16. Since the
introduction of this benefit, Social Security Scotland
has approved 2,455 applications from families
with disabled children, around 82% of the total
applications received, which is higher than the
Scottish average (80%). Families in South Lanarkshire
with disabled children have benefited from an
additional £44.3 million up to 31st March this year.
Social Security Scotland continue to promote their
child focused benefits and provide information
and promotions online to stakeholders. Invites
to information sessions are regularly sent to
stakeholders, to ensure partners are kept up to date
with new developments and opportunities to pass
onto families. Media campaigns are continuing and
are targeted at client groups, such as low-income
families. Social Security Scotland continue to help
clients directly via appointment with resources to
support with tasks such as application completion,
information around appeals, and to signpost the
community to the support that the benefits provide.
Supporting Care Experienced Young
People manage money better
All care experienced young people are supported to
budget for themselves through advocacy support,
help from the Promise Team and from other corporate
parents. Young people are offered dedicated support
including using the available food larder, managing
their savings and accessing welfare and benefit
advice through Money Matters. Young people have
also benefited from an initiative called ‘Winter Wishes’
which provided one-off cash awards to help with the
additional cost of living demands between December
and February and further help was provided for young
people gaining their own tenancy.
Maximising Child Trusts Funds for
care experienced young people
Young people over 16 have been supported to
actively manage their Child Trust Fund and/or
Junior ISA savings accounts, which are currently
administered by the Share Foundation. The council
have been working with Share Scotland to identify
any unclaimed ISAs and to make sure that young
people get the financial benefits they are entitled to.
Eighteen young people took part in financial
education courses. All the young people who
participated benefited financially in some way and
a total of £9,850 was provided to those completing
courses. Four young people gained £1,500 for their
Child Trust Fund as a result of their participation. In
addition, a number of contributions were made to
young people’s savings accounts/Junior ISAs. For
example, £1,500 has been added to the account
of a young person who has been adopted, £2,430
has been added to five accounts of young people
currently in care.
Making the most of benefits advice
All care experienced young people are supported to
receive financial help in the form of awareness raising
about benefit entitlement, financial education and
budgeting. The Money Matters Advice Service meet
with young people in the Care Hub on a regular basis
and offer drop-in sessions or dedicated appointments
when needed. As a result, care experienced young
people are building their confidence with managing
their money and budgeting and beginning to access
additional entitlements.
As a result of the financial support young people
have been offered, over 70% say that they are now
better informed and more confident about financial
planning as a result.
13
SLC 
print proof
333

Page 334

The Early Learning and Childcare service has
continued to work with partners to encourage and
maximise uptake of free childcare entitlements for
two- and three-year-old children. There has been a
13.6% increase in the number of 2-year-olds taking
up the offer of up to 1,140 hours of free, funded
childcare per year. Now just under 30% of all 2-year-
olds in South Lanarkshire are taking advantage of the
entitlement, the highest percentage on record.
Reducing the cost of the
school day initiatives
Following the publication of a Cost of the School Day
Policy, a new, complimentary guidance booklet was
produced for South Lanarkshire schools in March
2024. Education Resources hosted a conference
dedicated to the issue of the Cost of the School Day,
the first of its kind to be hosted in South Lanarkshire.
This was featured on the Child Poverty Action Group
website, detailing 10 key proposals; https://cpag.org.
uk/news/south-lanarkshire-council-launches-their-
cost-school-day-guidance
A Cost of the School Day Position Statement has been
implemented in 80% of schools and it is intended
that at least 60% of schools will have a Cost of the
School Day Policy in place by October 2024.
Participatory Budgeting 
in Schools
All South Lanarkshire schools who receive Pupil Equity
Funding have contributed at least 5% to participatory
budgeting activities this year. Schools have been
working to improve engagement with children,
parents and staff to ensure that the priorities of
school communities better inform how the budget
is spent. Pupils and parents from all of these schools
have contributed to informing which activities for
pupils are offered.
Case Study – 
Lanark Primary School
Lanark Primary School used 5% of their allocated
Pupil Equity Fund monies (£2,430) on participatory
budgeting. The school identified families to contact
directly, to gather their thoughts and suggestions of
how the budget could best be spent. After discussion
and narrowing down to four ideas, these went to the
school community to vote on. These suggestions were:
1. School trip contributions to 
reduce costs for all families
2. Free fruit for snack times
3. After school clubs 
(especially cooking and gardening)
4. Fidget toys and sensory resources
The majority vote went to maintain a zero or 
reduced cost for class trips (40%) and running more
after school clubs (38%). It was agreed to fund both
as far as possible.
In terms of participating in the process, 100% of staff
and pupils voted and 77% of parents voted. At Lanark
Primary, 31% of pupils reside in the 40% most deprived
areas and/or are entitled to free school meals.
One positive outcome of this participatory budgeting
process so far is that all primary seven pupils have
attended at least two after school clubs supported
by the fund.
Driver 2: Progress on minimising 
the effects of Cost-of-Living rises
Increased uptake of funded and early learning and childcare entitlement for 
2 and 3 year olds - South Lanarkshire Council Early Years Learning and Childcare
Section 3 - 
Our plan and its progress
14
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
334

Page 335

Maximising the uptake of
School benefits – free school
meals and clothing grants
On average 69% of primary pupils eligible for a free
school meal have taken up a meal option, an increase of
2% on the previous year. While around 40% of secondary
pupils who were eligible for a free school meal, took a
free meal, again amounting to a 2% increase. More than
half a million free meals were provided for pre-school
age children and nurseries during the past 12 months,
well in excess of the target for the year.
The number of pupils in South Lanarkshire primary
and secondary schools benefiting from clothing
grants was 12,353, or more than 1 in 4 children, 
which is a slight decrease on the previous two years.
Case Study - 
Carstairs Junction Early
Learning and Childcare
supporting families
Carstairs Junction Primary Early Learning and
Childcare has a strong focus on equity, ensuring
there are no cost barriers to engagement and
participation. All decisions are underpinned by
their Cost of the School Day policy and their termly
community newsletter signposts families to financial
and wellbeing support in their local area.
The school’s ‘Grab Rail’ is available for families to
access pre-loved uniform items. This resource is
accessible daily and is highlighted to families through
the establishment’s newsletter on a regular basis.
They also have seasonal items for parents to access,
such as Halloween costumes and winter clothing, in
recognition of the additional financial pressures these
items may place on families.
Staff know the families very well and sensitively
identify where additional supports may be required.
Families are supported to access funding through the
Greggs Hardship Fund for families requiring financial
support for clothing and household goods etc.
The school are aware of individual family
circumstances and are flexible with drop off and pick
up times to ensure no child is impacted by factors
such as the local transport network.
Promoting Active Travel
among young people
There has been a small increase in the percentage of
children using active travel to get to school over the
past year, that means that more than 60% of children
are now travelling to school using some form of either
active or sustainable travel. There has been a 6%
increase in the number of schools producing an Active
Travel Plan, from 78 last year, to 83 schools this year;
the highest number ever recorded.
A further 55 schools are aiming to complete a plan
during the course of 2024, contributing towards
pupils’ overall health and wellbeing. Throughout the
year, there were some excellent examples of schools
and nurseries who had completed their School Travel
Plan and continue to deliver important road safety
messages throughout the school year.
As of 31st March 2024, 74% of young people under
the age of 22 in South Lanarkshire had signed up for
free concessionary bus travel, higher than the Scottish
average of 72%.
Case Study - 
Cairns Primary School,
Cambuslang
An action from Cairns Primary School Travel Plan
was ‘Park and Stride,’ with the school focusing on this
campaign aim of improving safety within the school
car park and on Ivy Bank Avenue, which is the road on
approach to the school car park.
Due to limited car parking spaces, the message of Park
and Stride was incorporated in a leaflet designed to ask
car users to think about their journey. Those who had
to drive, were asked to park away from the school and
walk the remaining distance.
The Junior Road Safety Officer Team launched their
Park and Stride message at the parent’s evening
in November, where they had a stall to which they
communicated to all parents and carers who attended
to encourage safe and sustainable travel.
15
SLC 
print proof
335

Page 336

Case Study – 
Spittal Primary School,
Rutherglen
The Junior Road Safety Officer Team spoke at
the school’s assembly to promote ‘Be Safe, Be
Seen’ and how to keep safe. They presented an
informative PowerPoint presentation on how to
keep safe. The School Travel Plan Award was
handed over and pupils heard about the key
messages of being safe and being seen.
Road Safety Simone was in attendance and
presented a selection of pupils with Road Safety
Calendar Competition ‘Highly Commended’
certificates, from this year’s competition.
The school have on-loan the Little Parking Buddies
to alleviate parking issues near the junction and
near the school car park entrance and exit.
Case Study –
Supporting 
Families initiative
The Supporting Families Rock Up and Ride Cycling
Programme is aimed at children aged 7-14 years,
delivering on the Scottish Government’s promise to
provide access to bikes for school age children who
could otherwise not afford them.
17 children attended five sessions delivered by
the Supporting Families initiative. Each child
was provided with a bike, helmet and safety
equipment. Siblings, along with parents and carers
also participated, with positive feedback received
from all involved.
“Amazing opportunity, both of us really
enjoyed it. My child is over the moon 
with his new bike.”
“I’m grateful for this programme and the
opportunity for my kids to have their first
bikes and I can’t thank the staff enough
for their support and patience.”
Section 3 - 
Our plan and its progress
16
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
336

Page 337

Tackling food poverty outwith
regular school hours/ Holiday Hunger
programmes and Breakfast Clubs
125 out of 126 primary schools are now offering a free
breakfast to pupils, the highest number on record. During
the year to December 2023 an average of 54,197 pupils
per week have benefited from a free breakfast, helping
to start the school day on a positive and healthy note.
This is a 5% increase on last year.
The Machan Trust
The Machan Trust, in partnership with the council’s
Community Resources have been supporting Cost of
the School Day activities, hosted in Larkhall schools.
This includes support for breakfast clubs in four local
Primary Schools, lunch clubs in secondary schools,
specifically supporting children with additional support
needs and anxiety and Easter/Summer Holiday Hubs.
This dedicated local support helps to minimise the
difficulties that school holiday periods pose for families
in terms of childcare costs and many of the parent
feedback comments directly addressed the service
filling that gap.
“Brilliant organisation, helped me work
more hours during the holidays and being
self-employed I always struggle in 
Summer with the schools off.”
“I was so grateful for having this 
support with having three young 
school age children.”
“Great service for people who work 
and do not have a lot of family support.
Keeps children interacting with other
children while on Summer break.”
Reducing housing costs 
for families
Increasing the supply of 
affordable homes for families
Housing and Technical Resources were able to
support families by matching their needs to available
properties including the following support:
	
T allocating fifty new council homes to families
with children, including seven properties for
families who have children with disabilities or
neurodiversity issues
	
T supporting inclusiveness for larger families by
building 27 larger homes across sites in Larkhall
and Hamilton
	
T freeing up a further 22 council homes for families
with children
	
T providing 104 additional new build homes for
social rent, and
	
T securing 165 homes through the council’s Market
Purchase Scheme, which provides opportunities to
support families who have particular requirements
by providing them with an affordable home that
meets their needs in an area they would like to live.
The council’s Housing and Technical Resources have
also been leading on the development of local
masterplans in a number of areas including East
Kilbride and Hamilton town centres, that have a
strong focus on affordable housing to meet the needs
of local communities, including families.
17
SLC 
print proof
337

Page 338

Maintaining affordable rents 
for council tenants
To inform the 2024/25 budget setting process, a
consultation was undertaken comprising of an online
survey, social media posts and presentations to
local tenant focus groups, gypsy/travellers and the
homelessness service user group. In total there were
1273 responses received during this consultation. This
helped to inform South Lanarkshire Council that set
an average rent of £79.27 per week, which continues
to remain lower than the Scottish Local Authority
average of £82.40.
Supporting the housing needs 
of minority groups
The council continues to support households with
children within the two council operated Gypsy/
Traveller sites in South Lanarkshire. Children and
young people from the Gypsy/Traveller site at
Shawlands Crescent in Larkhall have been working
with the council to design and create a new play
area on the site. The new park utilised the area of the
former, disused play park on the site, with residents
helping to clear the area before construction started.
A key part of the project has been to improve the
communal space available for families to spend more
time outdoors, which is an important part of Gypsy/
Traveller culture. Special consultation meetings were
held with children to design the parks layout and
choose the various pieces of equipment, with the final
designs agreed with all residents.
A young person on the site said:
‘It’s really cool to have this here, I really like the
climbing frame which I picked. It’s amazing to see’
One resident said:
‘The new play park is brilliant. I wish we had
something like this on our doorstep when we were
growing up.’
The project is part of the latest round of investment in
the council’s two sites that aim to improve the lives of
Gypsy/Travellers, aligning with national approaches
to reduce the longstanding discrimination faced by
members of the Gypsy/Traveller community.
Reducing energy costs for families
Money Matters and Citizen’s Advice have supported
over 10,000 households with energy advice during
the last year, a 154% increase on the numbers who
were looking for energy advice in 2022/23. As part of
this support Citizen’s Advice have helped nearly 1,500
families with energy or energy debt advice, a 122%
increase on the previous year. This has resulted in
families benefitting from £682,000 in financial gains
and benefits, a 157% increase on the amount secured
compared to the previous year. In addition to this
support, local foodbanks have issued 2,279 fuel and
energy vouchers to families, a 12% increase on last year.
The council have utilised national Energy Efficient
Scotland funding to make improvements to 34
privately owned and 11 council properties which aim
to improve the heating efficiency for households and
reduce the energy required to heat them.
The council launched the new Energy Company
Obligation Scheme, which helped over 100 privately
owned properties to benefit from energy efficient
improvements at no cost to the family. Utilising
existing resources within Housing and Technical
Resources to administer and monitor the scheme,
funding is drawn from national energy companies
for use by local contractors to instal improvements
to homes. Work to date has included new heating,
insulation and solar systems with an initial focus on
the scheme to support households who are vulnerable
to the cold, including those with young children.
The Scottish Government are currently developing a
new Social Housing Net Zero Standard that is expected
to be introduced in 2024/25. Until this standard is in
place, guidance requires the council to monitor and
report on performance in relation to energy efficiency
of the housing stock. Improving fuel and thermal
efficiency within homes and reducing energy costs for
families is a key part of this. In 2023/24 over 95% of the
council’s housing stock passed this standard.
Community Links
Community Links have hosted a variety of community-
based activities aimed at increasing energy saving
among families in the Blantyre, Larkhall and Hamilton
areas. These activities included the distribution of
energy saving devices such as slow cookers, air fryers,
LED bulbs and draught excluders. Devices were
distributed to over 140 families, making a real difference
to help parents and carers manage their energy costs.
Section 3 - 
Our plan and its progress
18
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
338

Page 339

“I absolutely love the devices given,
especially the air fryer and slow cooker, 
it has made life with three young children
easier and I’ve noticed a difference in my
electricity costs. I really appreciate it, 
thank you very much.”
“It was brilliant. I couldn’t believe what we
received. We use the air fryer all the time.
The draft excluders and light bulbs were
magic too and have saved us loads 
of money. Thank you!”
Reducing homelessness and
the threat of homelessness
among families, children and
young people
The council continues to work with local partners to
address the challenge of homelessness, reduce the
number of homeless households and minimise the
impact on children and families wherever possible.
Despite this dedicated support, the number of
families experiencing homelessness continues to
increase and in the last year 305 families had to rely
on temporary accommodation at some stage, this is
compared to 245 families the previous year.
However, significant progress was made in terms of
the number of urgent homeless applicants allocated
a property. There were 433 properties allocated to
families compared to 358 last year, 15 properties
allocated to 16 -17 year olds, which is similar to last
year and 278 properties allocated to 18-25 year olds
compared to 222 previously, a positive increase. The
council were also able to help two families converting
their temporary accommodation tenancies to a
Scottish Secure Tenancy, allowing them to remain in
their home permanently.
Tenancy Sustainment Fund
The Tenancy Sustainment Fund, introduced in 2020
helps to support tenants to maintain their rent
payments in order to sustain their tenancy and
prevent homelessness. This year a total of 493 awards
were made from the fund with awards totalling over
£100,00 helping children and families.
Supporting care experienced
young people to plan for and
move to independent living
in the community
Planning for suitable accommodation
for young people
Housing and Social Work staff have been working
closely to better understand the needs of young
people moving into their first independent living
home and to make sure they are offered the best
option possible. Every young person leaving a care
situation is supported by an independent plan that
informs what accommodation is offered and the
support they get to move into their new home. Young
people have told us that this support is valuable in
helping them move into their first home.
In the last year 43 young people were provided with
their first home, an increase of more than 40% on last
year and 43 new applications were received, a drop
of around 10% on the previous year.
Supporting young people in their home
We are developing a multi-agency approach to
providing care experienced young people the best
home possible to make sure that they are satisfied
with their home when they get it and are supported
to make sure it continues to meet their needs. This
includes making sure training is provided for third
sector agencies and having a clear plan to engage
young people in the process.
We have recently secured additional funding from the
Big Lottery to work in partnership with Barnardos to put
in place a new Youth Housing Support Project that will
provide dedicated support for young care experienced
people getting their first independent home.
Developing a Throughcare 
Housing Protocol
Housing and Social Work have been working closely
with the Champions Board young people to develop
and implement a Throughcare Protocol, which was
launched in January 2024. The protocol means that
young people moving into their first tenancy will get the
right support they require at the right time to create a
safe, affordable and comfortable home environment.
19
SLC 
print proof
339

Page 340

Improved digital inclusion amongst
families in the most deprived areas
Five Digital Inclusion Hubs are now established in
South Lanarkshire, supported by the Good Things
Foundation, who have developed an interactive
map to direct people to their nearest hub for digital
support; www.goodthingsfoundation.org/
our-network-services-map.
The hubs have helped the distribution of 720 SIM
cards through local foodbanks, allowing free mobile
internet access to foodbank users and their families.
As part of the Pupil Equity Funding participatory
budgeting approach, Neilsland Primary School worked
with pupils to tackle digital exclusion and upgrade IT
equipment which led to positive outcomes for learners.
Case Study – 
Digital Inclusion in
Neilsland Primary
School, Hamilton
Neilsland Primary School is in an area of high
deprivation, where almost all classes have a majority
of children from SIMD 1 and 2 and/or entitled to free
school meals.
Consultation on options for using their Pupil Equity
Fund spending took place with children, staff and
parents/carers, with favoured ideas being around
new Chromebooks and also stationary stations in
each classroom.
As a result of the participation process, the school
aimed to improve engagement levels of targeted
pupils and increase their punctuality and attendance.
Positive results were recorded in both areas by
February 2024. 93.6% of targeted pupils increased
their engagement in reading, 90.4% increased their
engagement in writing and 94.2% increased their
engagement in numeracy as a result of the addition
of the new Chromebooks
In addition, the number of children being late for
school has decreased gradually from 13% in February
2023 to 9% in February 2024.
Reducing food poverty
Foodbanks across South Lanarkshire have helped to
feed over 25,500 children and young people through
emergency food parcels over the last year, a 14%
increase on the previous year and the highest number
ever recorded. Many of these referrals have come
from working in partnership with Money Matters
and Citizen’s Advice, who have referred almost
5,000 households for emergency food assistance, an
increase of 37% over the previous year.
In line with dignity and cash first principals, local
foodbanks have been looking at more sustainable
alternatives to distributing emergency food parcels.
The majority of foodbanks in South Lanarkshire are
now issuing cash or supermarket vouchers to allow
users greater choice to purchase their own food,
as well as the ability to buy healthier and more
nutritional food items, such as dairy products, fresh
meat and vegetables.
As part of this change in approach, local food banks
have distributed 1,485 supermarket/retail/fresh food
vouchers to clients, a 143% increase on the number
distributed during 2022/23.
Local third sector organisation, Healthy Valleys
organised nine Cooking on a Budget Courses for
children and young people during the past year.
Promoting healthy living
among children and families
living in poverty
Over the past year help has been provided to families
experiencing cost of living challenges to access
opportunities to participate in sport, leisure and
cultural opportunities. South Lanarkshire Councils
Employability Service in partnership with South
Lanarkshire Leisure and Culture were successful in
a bid to the Scottish Government’s Tackling Child
Poverty Fund, securing funding for 225 free leisure
passes targeted at low-income families.
The free passes allowed both families and children
access to leisure facilities including local gyms,
swimming, and skating, supporting and improving
health and wellbeing and providing valuable time
together as a family.
Section 3 - 
Our plan and its progress
20
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
340

Page 341

Case Study – 
Rhy and Lauren
stopping smoking
Rhy wanted to stop smoking for health reasons,
including to improve health for starting a family.
Rhy and Lauren were spending approximately £100
per week on cigarettes before they quit. He found
out about the Quit Your Way Service at the local
pharmacy, spotting a Quit Your Way jar of tar on the
pharmacy counter, which he felt looked disgusting. The
tar jar prompted Rhy to ask more questions and found
out about the free stop smoking support available in
store. Rhy then shared with his partner Lauren what
he had found out about the Quit Your Way Pharmacy
Service. Both Rhy and Lauren had tried to stop smoking
in the past on their own. Rhy had quit attempts with
and without using nicotine replacement products and
Lauren tried to stop before without using any nicotine
replacement products. Triggers of having a bad day,
life and work stress had made stopping smoking more
difficult in the past. After the conversation in store, the
following week, both Rhy and Lauren returned to the
same local pharmacy and signed up for stop smoking
support, agreeing to stop smoking together.
As well as getting weekly face to face brief
behavioural support from Heather the pharmacist,
both Rhy and Lauren used combination therapy
of nicotine replacement patches and nicotine
replacement mini lozenges over the 12-week period,
with Lauren mainly using mini lozenges in the 
end with additional two weeks supply as required. 
Along with using nicotine products during their quit
attempt, they also put in place coping strategies and
distractions to help them deal with cravings, withdrawal
symptoms and other life stressors. Lauren felt cleaning
was a very good distraction, while Rhy avoided going
outside at break times to limit any temptations.
Both Rhy and Lauren stopped smoking and are now
‘proud’ that they are 15 months’ smoke-free. They are
most proud that they were able to welcome a baby
boy, Desmond, who is now four months old, and they
are all enjoying the benefits of a smoke-free home
together. They also shared that stopping smoking
together was helpful and nice to do as a couple
as it made a difference to their own successes to
becoming smoke-free.
With the money they saved from quitting smoking
they have been able to buy items for their new baby.
Lauren says they used to have financial difficulties
at the end of every month, but now they don’t worry
about money. The nicotine replacement products
helped both Rhy and Lauren with cravings and
withdrawal symptoms throughout their journey and
they no longer use products. Both agreed going ‘solo’
was much more difficult and stressful compared with
getting help and support and using the available
nicotine replacement products.
“Don’t do it alone – get support, 
its more stressful otherwise.”
Reduce costs associated with 
health harming behaviours
The NHS Lanarkshire ‘Quit Your Way’ Service, is a
programme that supports people to stop smoking,
and is available to anyone in Lanarkshire who wants
to quit, but with targeted work focussed on pregnant
women, living in areas of higher deprivation. Pregnant
women and families are offered a referral to financial
wellbeing providers to maximise their income and this
year, eight advisors from Money Matters participated
in Smoking and Poverty Training. This mutual referral
method helps with a ‘no wrong door approach’ and
the positive relationships built between services
provides a benefit to families.
One of the main targets of the Quit Your Way model
is to evidence how families are saving money by
stopping smoking and advise on how savings can
spend on household necessities. The project has found
that quitting smoking saves people a significant
amount of money. On average a pack of 20 cigarettes
in the UK costs £14.59. This means quitting smoking will
save people £102.13 per week, £408.52 per month and
£4902.24 per year if they smoke 20 cigarettes per day.
The most recent evidence shows that in South
Lanarkshire, 8.2% of pregnant women are smoking
in pregnancy, lower than the Scottish average of 11%.
Between April and September 2023, six pregnant
women living in the most deprived areas successfully
quit smoking within 12 weeks of their pregnancy.
21
SLC 
print proof
341

Page 342

Breastfeeding
Families are benefiting from support to encourage
new mothers to breastfeed their babies, including
access to breastfeeding groups. Additionally, there
has been a range of promotional events and training
opportunities, and information on breastfeeding and
associated policy being embedded into the NHS
Lanarkshire induction for new staff. This year, new
ways to ensure timely support for families in financial
crisis to maximise breastfeeding and/or provision of
formula milk has been explored by staff and work will
continue over the next year at least.
South Lanarkshire Council has commenced a working
group and is working towards achieving Bronze level
in the Breastfeeding Friendly Scotland Local Authority
Award. This includes all council premises signing up to
the scheme.
Evidence based approach to 
tackling child poverty through
Neighbourhood Planning
South Lanarkshire Council’s Community Planning
Partnership and Community Engagement Team
have implemented an area-based approach to
tackling child poverty, in the form of a dedicated
Neighbourhood Plan in East Kilbride, the first of its
kind in Scotland.
Data from East Kilbride highlighted that the areas of;
Crosshouse, Greenhills and Whitehills ranked highest
on the Scottish Index of Multiple Deprivation in East
Kilbride. After discussion, the community stakeholder
group agreed that door-step engagement should focus
on the more deprived area in Whitehills. Residents in
these areas would be least likely to engage in other
consultation methods, and the Neighbourhood Plan
addressed inequalities in the area.
Local data showed that almost two thirds of the data
zones have a rate for child poverty (before housing
costs) above the Scottish average and almost two
thirds of children living in poverty in the area live in
a household where one or both parents work. This is
greater than either the South Lanarkshire (63%) or
Scottish (64%) average. East Kilbride recorded the
highest number of families referred to local foodbanks
accounting for just under two thirds of the South
Lanarkshire total.
An online survey, door-to-door conversations, pop-
up events and engagement sessions in local primary
schools helped gather a strong understanding
of experiences of living in the area and what the
community would like to see change in the future. By
targeting a small geographical area in this way, with
higher-than-average rates of child poverty, the aim of
this work is to reduce the number and percentage of
children living in poverty in the area.
Targeted priority family type
approach to tackling child poverty –
Paths away from Poverty
Paths away from Poverty is funded by the Scottish
Government’s Child Poverty Accelerator Fund and is
supporting families where there is a child or a young
person in the household with a disability. While this
project is in the early stages of development (it will
run until March 2025 working with at least 10 families)
it is beginning to identify potentially more effective
ways to engage and support families to deal with
financial, wellbeing and inclusion challenges.
Support is delivered primarily through a key worker
relationship, with workers for the project being
provided by third sector organisation COVEY. The
project is currently supporting five families address
and find solutions to a range of challenges with a
number of families ready to be referred for support.
Already benefits to the families have included;
improved financial wellbeing through help with
urgent financial wellbeing assessments, improved
health and wellbeing as a result of strengthened
relationships with NHS Lanarkshire, CAMHS and
local GPs, reduced social isolation with three families
moving to weekly support and one young person
benefiting from COVEY befriending support with
other additional needs young people.
Families are sharing what has
changed for them because of
the support they have received,
including increased engagement
with support
that they feel is
helping towards
personal plans
and solutions and
better outcomes
for their children.
Section 3 - 
Our plan and its progress
22
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
342

Page 343

Driver 3: 
Income from Employment
Local Employability Partnership
South Lanarkshire Works is host to a Local
Employability Partnership for organisations with a role
in delivering opportunities to improve employability
opportunities for young people and adults in our
communities. A multi-agency Tackling Child Poverty
subgroup has been established (South Lanarkshire
Council, NHS Lanarkshire, Public Health Scotland,
Clyde Gateway, Skills Development Scotland, and
South Lanarkshire College) to specifically consider the
role that local employability action/policy can play
in lifting families out of poverty. The intention of the
group is to bring together local partners with a stake
in eradicating child poverty, through actions such
as how to implement national policy directives at a
local level, consider good practice from other local
authorities, as well as to examining new methods,
practical research and the use of data to ensure
continuous improvement and how to take advantage
of new opportunities for funding that are available.
This group share best practice and identify unmet
need for the benefit of parents engaging with the
Employability Service and stakeholders. Aligning and
integrating each programme, to ensure that no-one
is left behind on their individual employment journey.
Employability Service
South Lanarkshire Council’s Employability Service
deliver parental employment support through the No
One Left Behind Tackling Child Poverty Funding from
Scottish Government, to the six child poverty priority
groups. Support is provided to all parents, with a
range of programmes, activities and interventions
which are participant led. Each parent has a
dedicated key worker with a robust action plan to
ensure a holistic approach. The Employability Service
works with partners to make all parents employment
journeys successful. Achievements from programmes
are explained below:
Supporting Families programme
Supporting Families is a joint project between Clyde
Gateway, South Lanarkshire Council and South
Lanarkshire Leisure and Culture that offer support to
parents who need most help to access a job. Parents
are supported with afterschool activity and access
to childcare that frees up time to enable them to
improve their employability options.
Parents are offered a wide range of help that support
families’ wellbeing in general and make it easier for
them to progress their employment journey. This
can include advice with housing concerns, financial
support from One Parent Family Scotland and
Money Matters, as well as engaging with English for
Speakers of Other Languages courses. Parents are
also benefiting from dedicated health and wellbeing
activities, and parenting support from the local
Family Support Hubs.
The Supporting Families programme is available
to targeted nurseries and schools in Rutherglen,
Cambuslang, Larkhall and Rigside. Since October
last year 27 parents have benefited from joined
up support from South Lanarkshire Council’s
Employability Service.
Driver 3 - Progress on maximising opportunities
to increase income from employment
23
SLC 
print proof
343

Page 344

A parent was referred by Westburn Nursery to help
her find a job and assist with debt management.
She was struggling with confidence, self-belief, and
mental health and also faced financial difficulties
and required support with benefits and money
management. Over a three-month period, her
barriers and challenges were addressed through a
Holistic Needs Assessment.
During the initial meeting, the parent expressed
her desire to train as a nurse. She had considered
college courses but was unsure about the
application process, having left school with no
formal qualifications. Her recent experience caring
for her grandmother and helping in a care home
motivated her to pursue this career path.
She was referred to One Parent Families Scotland
for benefits check to ensure she was receiving all
the relevant benefits and support with money
management. She needed a new fridge freezer, so
One Parent Families applied for funding to assist
with this. The key worker invited the parent to
attend Health Walks at the nursery to improve her
mental health and referred her to ‘Rain or Shine’ for
clothing for her son.
The key worker spent several weeks getting to know
her before discussing the possibility of applying
for a Scottish Wider Access Programme Nursing
course. These courses are designed for individuals
with few or no formal qualifications who have been
out of education for three to five years. The parent
was enthusiastic about applying to Glasgow Clyde
College Langside Campus due to its accessible
location. The key worker reviewed her personal
qualities and experiences, including caring for her
grandmother and working in an elderly care home.
She was invited to an interview at the college and
received an unconditional offer the following day.
She was elated and could hardly believe she was
going to college. The nursery has been supportive
regarding her childcare needs, accommodating her
college schedule.
“You’ve made me more confident; you’ve
helped me believe in myself a lot more.
You’ve helped me so much; you’ve come into
my life and changed it. You’ve stuck by my
side, and we clicked right away. I can’t thank
you enough and really appreciate you.”
Making It Work
Routes to Work South deliver the Making It Work
programme, supporting parents increase their
employability skills. The programme covers all of
South Lanarkshire, offering each parent a bespoke,
tailored service to suit their individual needs.
The programme includes personal and social
development activities to build confidence and improve
wellbeing. It also enhances employability skills through
training and qualifications, bringing participants closer
to their end goal of employment. By providing peer
group support, childcare advice, with access to 
‘The Dressing Room’ for interview clothing, the
programme addresses various barriers to employment.
This year, the Cambuslang Training and Enterprise
Centre base has opened the Cook and Learn
Community Café, where two parents with lived
experience have become employed.
These parents assist other participants in gaining
skills and vocational qualifications, while also learning
to cook on a budget. Participants can take home the
ingredients to feed their families. The programme
has seen 239 parents engage, 80 parents enter
employment, one move into further education, 
and 31 obtain qualifications.
Case Study – 
Supporting Families, Westburn Nursery
Section 3 - 
Our plan and its progress
24
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
344

Page 345

A parent joined the Making It Work programme
seeking employment. Her barriers to employment
included living in a jobless household with
dependent children, long-term unemployment,
and low skills due to not working for years.
Consequently, she lacked self-confidence and skills.
Upon joining the programme, the parent
mentioned that her personal skills included
baking, which she enjoyed. However, she felt she
lacked the confidence to apply for jobs or attend
interviews, having been out of the workforce since
2005 to care for her daughter, now 16 years old.
Despite having a few health problems, she was
determined not to let these hold her back from
moving into employment.
The Routes to Work advisor supported the parent
in building an up-to-date CV, assisted with job
searching and matching jobs to her interests and
skills and helped her apply for suitable vacancies.
Additionally, she was supported in tailoring her CV
for each role she applied for and was given access
to a ‘My Job Scotland’ account. The parent was
also provided with a ‘better off in work’ calculation
to understand how employment would affect her
current situation.
The parent applied for several care assistant roles
and secured an interview in March for a Domestic
Day Care role with South Lanarkshire Council. She
felt the interview went very well, but two weeks
later, her mother passed away after a heart
attack. She took this loss badly and was not well
enough to progress to the next interview stage.
She was signed off by her doctor to recover over
the next few weeks and contacted the advisor
a few weeks later, ready to move forward with
her employment journey and get her life back
on track. The advisor assisted the parent with
the application process and interview skills, and
she subsequently secured an interview with NHS
Lanarkshire for a cleaning role that she was then
offered and was “over the moon.”
Demonstrator Project Programme
Parents have been benefiting from the
Demonstrator Programme, which is a place-
based project designed to offer parents real
employment experience in a live work setting.
The project is run by NHS Lanarkshire and its
commissioned Facilities Management service.
The council’s Employability Service funds the
wage subsidies for up to six months, including the
costs of job start payments that bridge the gap
until the first wage is received and a contribution
to the NHS costs. Parents have benefited from
experience in real posts that suit their childcare
commitments, with progression towards suitable
long-term employment, if possible.
During the last year the project started with
19 parents in South Lanarkshire, and to date
17 are still engaging with the programme. As
a result of the experience six parents are still
learning from their placement, four have signed
up to NHS Staff Bank (to select shifts that suit
around their childcare), three have progressed
into employment and a further seven are due to
start permanent employment. Two parents have
completed their work placement and continue to
search for suitable jobs.
As a result of the benefits to participants, the
project will be continued and it is planned to
extend the opportunities to include the State
Hospital at Carstairs, which would suit parents
within the rural community and to South
Lanarkshire Council, specifically targeting cleaning
and catering roles, with the opportunity to apply
for permanent positions during the six-month
placement.
The Demonstrator Programme is a project
that supports the work of NHS Lanarkshire as
an Anchor Organisation, working to make a
difference to health and wellbeing outcomes and
reduce inequalities through work across five pillars.
Case Study – 
Making It Work
25
SLC 
print proof
345

Page 346

He was offered a position on the Demonstrator
Programme as an Admin Officer with hours that
suited his childcare needs, which provided him
the opportunity to work in a comfortable setting,
earn a steady income while still being available for
family commitments.
Efforts were made to improve the parent’s CV
and support job searches to help him find suitable
employment. He was assisted in applying for NHS
Staff Bank shifts, which suited his childcare needs.
Initially placed in an admin role within an Intensive
Care Unit setting, he found the environment
triggering due to a previous personal experience.
The NHS Employability Team and management
were very supportive and worked to relocate him
to a more suitable location.
The parent reported that the supportive
environment significantly improved his health.
He also received a £300 job start payment to
assist with clothing, transport, and other expenses
until his first pay. To help him remain in work, the
Employability Team worked closely with him to find
a suitable location and later secure employment
that matched the needs of the whole family. The
parent now works covering Admin Staff Bank shifts,
which he can select to suit family requirements and
earns a monthly salary that fits his circumstances.
“The opportunity to train and develop
myself has been very beneficial. My
health has improved as it is a supportive
environment, and everyone is very helpful.
I would say get yourself signed up; get
all the support you need as there are so
many opportunities that you might not
realise could help you get into work.”
Case Study – Demonstrator Programme
A parent was referred to Routes to Work South by
Jobcentre Plus as he was unemployed and seeking
employment opportunities. He was supported to
apply for the Demonstrator Programme.
The parent was unemployed with two children, one of
whom is disabled. He needed a job that would allow
him to help his wife care for their children outside of
school hours. Previously a nurse overseas, he wanted
to transition into an administrative role due to a
previous personal experience.
Section 3 - 
Our plan and its progress
26
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
346

Page 347

A parent of two children who was employed as a
drainage engineer with limited career progression
due to a lack of qualifications and training was
seeking to enhance his career prospects. He reached
out to South Lanarkshire Council’s Employability team
and was referred to the Upskilling Team for support.
It was identified that obtaining an HGV driving licence
would significantly broaden his career opportunities.
With an agreement from his manager, the parent was
promised a promotion upon completing this training.
The Upskilling Team sourced and funded the HGV
training and maintained regular contact to ensure
he attended medical appointments and received
the necessary training materials. The parent was
delighted at securing a funded place with a training
provider for his driver training and tests as he was not
able to finance the training himself. The upskilling
advisor kept in contact with the parent’s manager
to ensure he could attend medical exams, training
sessions, and tests.
The training opportunity has boosted his confidence,
enabling him to successfully secure a job as a
drainage technician at a higher rate of pay. Once he
passes his HGV test, he will be offered a promoted
position with an increased salary, improving his
career opportunities and financial situation further,
benefiting both himself and his young family.
“The Upskilling team has given me the freedom
to secure a position within a thriving business
and undertake training that not only provides
me with an additional qualification but also
allows for career progression and greater
financial freedom for my family and me.”
In Work Upskilling
A number of employed parents have been benefiting
from in-work support through the Upskilling
Programme, which offers training and qualifications
to help parents become financially more stable,
gain increased hours and achieve higher wages,
promotions and permanent posts.
Parents have been helped to sustain and secure
advanced employment while improving their
Support for the living wage
and fair work practices
As part of the Community Wealth Building approach,
we have worked to ensure that all anchor organisations
and community planning partners including the council
and NHS Lanarshire have adopted the living wage,
living hours and fair work practices.
During last year South Lanarkshire obtained 35
new living wage accredited employers making a
total of 175 accredited employers. Throughout the
year the group continued to promote the living
wage campaign by attending events and using
social media messages to raise awareness including
supporting the Living Wage Week in November 2023.
employability skills and wellbeing, helping to achieve
financial security and become better off.
Since September last year 59 parents have been
supported with 42 parents undergoing their Scottish
Vocational Qualification level 2/3 in Health and Social
Care. 16 parents completed accredited training in
practical areas such as forklift licence, HGV licence
and First Aid certificate.
Case Study – Parental in Work Upskilling
Creating opportunities for
employment and upskilling
with third sector partners
Voluntary Action South Lanarkshire
Voluntary Action South Lanarkshire are engaging
with our parents to create bespoke volunteering
opportunities that suit the start of their employment
journey and childcare needs. So far 13 parents have
begun their volunteering journey.
The Employability Service aims to assist each parent
in achieving increased income through enhanced
employment opportunities, such as paid placements,
volunteering, training, and qualifications, as well
as in-work support. Additionally, it offers holistic
guidance to continue their employability journey,
addressing the needs of the entire household and
working to alleviate poverty.
27
SLC 
print proof
347

Page 348

Section 4 - Monitoring of progress and 
delivering on our ambitions
As a partnership, we take improvement seriously and
continuously look to where we think we can deliver
the best support to our children, young people and
families. We are informed by a Joint Strategic Needs
Assessment, built around available data, the voices of
children, young people and families and the views of
our wider workforce. This assessment informs a range
of planning and decision-making processes.
Our commitment to continuous improvement is built
around activity designed to improve standards and
services, for example:
	
T Producing our Local Child Poverty Action Report
	
T Implementing a clear Performance Framework that
utilises measures to show the impact of our work
	
T Evaluating our work and using information to
promote best practice across agencies
	
T Engaging children, young people and families
to hear their views and experiences of accessing
services, life circumstances, hopes and aspirations
	
T Using available data and other evidence to inform
our joint planning and evaluation
By taking this approach to what we do, we can
map our progress and refine our work to ensure we
are doing the right things in the right way. Most
importantly it helps us understand where we are
making a positive difference for children, young
people and families.
Indicator Baseline Most recent Change 12 months
Percentage of children (0-15) living in
relative poverty (after housing costs)
Baseline 2022
22.8% (SLC)
24.4% (Scotland)
2023
23.6% (SLC)
24.2% (Scotland)
SLC= +0.8%
Scotland= -0.2%
Percentage of children in low-income
families (before housing costs)
Baseline 2022
19.4% (SLC)
20.8% (Scotland)
2023
19.9% (SLC)
21.3% (Scotland)
SLC= +0.5%
Scotland= +0.5%
Percentage of households with children not
managing well financially
Baseline 2019
13% (SLC)
12% (Scotland)
2021
7% (SLC)
8% (Scotland)
SLC= -6%
Scotland= -4%
Percentage of children living in families
with limited resources after Housing costs
Baseline 2019
15.1% (SLC)
16.6% (Scotland)
2019
15.1% (SLC)
16.6% (Scotland)
No new data available
Percentage of fuel poor households Baseline 2019
22% (SLC)
24% (Scotland)
2019
22% (SLC)
24% (Scotland)
Next data update
expected early 2025
We have set a suite of measures that will help determine if we are being successful in this ambition.
These are:
28
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
348

Page 349

Three ‘step change’ areas
The three areas for development identified as step
change activity in addition to our core priorities:
1. Successful extension of routine enquiry and
active referral beyond existing pathways.
2. Developing holistic, wraparound support 
for parents to guide them through
obstacles to employment 
(skills, childcare transport, mental health, 
benefit entitlement) and beyond.
3. Implementing an ‘Ask Once’ test of 
change to identify better ways to deliver
support to families experiencing poverty
and money worries.
How will we achieve this?
	
T Continued use of ‘Test of Change’ methods to try
new ways of working, with families at the centre
of this work
	
T Increased joint working and the pooling of
expertise and resources to deliver additional value
through the Child Poverty Working Group and the
organisations it represents
	
T Working with other partnership groups and
networks to drive forward change activity such
as the Whole Family Wellbeing and Keeping the
Promise Thematic groups
	
T Commitment to an increasingly evidence based,
outcome focused approach, which gives particular
consideration to the needs of the priority groups
at highest risk of child poverty
	
T Meaningful involvement of families with lived
experience and the third sector in policy
development, decision-making and delivery.
29
SLC 
print proof
349

Page 350

Section 5 - Our priorities for 2024/25 
and the longer term
Income from benefits Cost of living Income from
employment
Working together to
deliver differently
An increase in the
awareness of families
about the benefits and
entitlements they are
eligible for
Reduction in financial
barriers to education for
school age children
Reduce the gap in
school leavers entering
a positive destination
between most deprived
20% and least deprived
20% areas
The voice of children,
young people and
families experiencing
poverty informs policy
development and 
service design
Families are more aware
of changes in available
benefits
Reduced housing costs
for families
Support care
experienced school
leavers sustain a positive
destination
Support the third
sector to be involved
in the planning,
implementation, and
delivery of child poverty
activity
Care experienced young
people improve their
understanding of money
and available benefits
Increased uptake
of funded and early
learning and childcare
entitlement for 2- and
3-year-olds
Increase employment
support for low-income
parents
Improve the use of
data so that partners
can build a shared
understanding of
poverty at household,
neighbourhood, and
locality level
Improved digital inclusion
amongst families in the
most deprived areas
Employees being paid
the living wage - parents
Deliver more holistic,
wraparound, accessible
support to families
experiencing poverty
Reduce Food Poverty Employee upskilling -
parents
Paths out of poverty Test
of Change – Families
with Disabilities
Reduce costs associated
with health harming
behaviours
Develop an ‘Ask Once’
test of change in 
East Kilbride
Increase the rate of
breastfeeding at birth
and at eight weeks
and achieve the
Breastfeeding Friendly
Scotland Local Authority
Bronze Award
30
South Lanarkshire’s Joint Local Child Poverty 
Action Report 2023—2024
SLC 
print proof
350

Page 351

Useful links
For further information:
Key Contacts:
Children’s Services Partnership Planning Manager,
Education Resources, South Lanarkshire Council
Floor 13, Almada Street, Hamilton, ML3 0AE
Email: education.inclusion@southlanarkshire.gov.uk
Community Engagement Manager, 
Corporate Resources, South Lanarkshire Council,
Floor 1. Almada Street, Hamilton, ML3 0AE
Email: Jennifer.kerr1@southlanarkshire.gov.uk
The Local Housing Strategy 2022-2027
www.southlanarkshire.gov.uk/local-housing-strategy
South Lanarkshire’s Community Plan
www.southlanarkshire.gov.uk/cp/
CommunityPlan2022-2032
South Lanarkshire’s Children’s Services Plan
2023 -26, Working together making a difference
www.southlanarkshire.gov.uk/childrens-services-plan
Children and Young People’s 
Health Plan Lanarkshire
bit.ly/NHS-children-young-peoples-health-plan
Best Start, Bright Futures, the national child
poverty delivery plan
bit.ly/tackling-child-poverty-delivery-plan
South Lanarkshire’s Community Learning and
Development Strategy and Action Plan
www.southlanarkshire.gov.uk/
community-learning-development-strategic-plan
Community Wealth Building Strategy
www.southlanarkshire.gov.uk/
community-wealth-building-strategy
‘Connect’ the Council Plan
www.southlanarkshire.gov.uk/council-plan
South Lanarkshire Works
www.southlanarkshire.gov.uk/info/200201/
south_lanarkshire_works
31
SLC 
print proof
351

Page 352

If you need this information in another language or format,
please contact us to discuss how we can best meet your needs.
Phone: 0303 123 1015
Email: equalities@southlanarkshire.gov.uk
Produced by Communications and Strategy. 067390/Oct24.
www.southlanarkshire.gov.uk
SLC 
print proof
352

Page 353

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Director, Health and Social Care  
Subject: Chief Social Work Officer Annual Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 outline the content of the Chief Social Work Officer Annual Report 2023/2024
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Chief Social Work Officer Annual Report 2023/2024 be noted.
[1recs]
3. Background
3.1. There is a statutory requirement for all local authorities to appoint a professionally
qualified Chief Social Work Officer (CSWO).  He/she must be registered with the
Scottish Social Services Council (SSSC).  The role of the CSWO is to provide
professional advice and guidance to local authorities, elected members and officers in
the provision of social work services, whether commissioned or directly provided. The
CSWO has a responsibility for overall performance improvement and the identification
and management of corporate risk insofar as these relate to social work services. 
3.2. The CSWO is required to prepare an Annual Report of activity to the Chief Social Work
Advisor for Scotland.  The deadline for return is 31 October 2024.  The office of the
Chief Social Work Advisor reviews all the reports and if there is clarification required,
they will contact individual CSWO direct.  The report follows a standardised reporting
framework and timeframe to ensure national consistency of returns and key issues are
highlighted to aid learning and the sharing of information nationally.  A summary report
is also published annually by the Scottish Government.  The CSWO report should also
be a public facing document available to the public elected members and professionals
that reflects the social work and social care activity within its local authority. 
4. CSWO Report
4.1. The report is split into an introduction and seven main sections, a copy of which is
attached as Appendix 1 and a brief summary of highlights are outlined below: 
4.2. Introduction
4.2.1. Introduces the purpose of the report and contextualises the role of the CSWO. 
17
353

Page 354

4.3.  Section 1: Governance and Accountability 
4.3.1. This section details the vision, values, and objectives of South Lanarkshire Council
(SLC) and how these link to the work of Social Work Resources.  It outlines the key
role and responsibilities of the CSWO and the systems, structures and reporting
arrangements which assure the quality of social work services.  Responsibilities are
outlined in relation to the South Lanarkshire University Health and Social Care
Partnership (South Lanarkshire University HSCP), Integration Joint Board (IJB),
Children’s Services, Public Protection, Community Planning, and the corporate
responsibilities of the Council. 
4.4. Section 2 and 3: Service Quality, Performance and Challenges
4.4.1. Service quality, performance management and reporting are intrinsic parts of the
duties of the CSWO.  The CSWO has responsibility to respond to Care Inspectorate
reports and findings from local and national activity, addressing the requirements of
internal and external audit and reporting on progress against outcomes and follow-up
actions from this activity.  This includes discussion with the Chair of Social Work
Resources Committee and presentation to Social Work Resources Committee on
inspection activity twice yearly.  As well as direct supervision from the Director, Health
and Social Care, dedicated quarterly meetings take place with the Chief Executive for
assurance and sight of all matters in relation to Social Work and Social Care. 
Information in relation to all inspection activity for 2023/2024 is included as an
appendix in the CSWO report. 
4.4.2. Engagement with service users and communities remains strong and is supported by
the South Lanarkshire Health and Social Care Forum.  This is an independent group
of community volunteers who work to engage health service and social care users,
carers, and communities to improve local services.  The Forum also supports wider
public involvement in planning and decision-making, and keeps local people informed
about the range and location of services. 
4.4.3. The public launch of Care Opinion took place on 8 December 2023.  All services
including Adult and Older People and Children and Justice are collaborating with Care
Opinion, a non-profit, independent feedback website that helps service users share
honest and anonymous stories about their experiences with our services.  The process
is specifically designed to consult and engage with service users, with feedback
published to promote a culture of transparency, learning and sharing of good practice. 
4.4.4. Similar to all public services across Scotland, Social Work Resources continues to
work in a challenging environment.  The cost-of-living crisis; increased morbidity; and
financial implications are a few of the ongoing pressures which are faced by social
work services.  These are coupled with immediate financial pressures being
experienced with a number of risks and uncertainties in the health and social care
environment and beyond.  This level of volatility, uncertainty, complexity and ambiguity
(VUCA) means that successfully planning and delivering sustainable change becomes
even more critical to ensure that we continue to support the most vulnerable people in
South Lanarkshire.  
354

Page 355

4.4.5. Section 3 also gives some case studies to give a flavour of the activity for the reader
and goes onto give examples across Children’s Services, Justice Services and Adult
and Older People Services.  Examples of developments include:- 
 Council’s ongoing commitment to The Promise
 Champions Board developments
 creation of Family Support HUBS
 creation of an Alcohol and Problem-Solving Court in Hamilton
 recovery Orientated Justice Service
 creation of a Whole System Approach Team for 16–21-year-olds 
 roll out of dedicated training for staff in relation to Self-Directed Support
 redesign of the care at Home Service and creation of a Home First model for
rehabilitation
 opening of a new state-of-the-art care facility, Blantyre LiFE, in March 2023
 technology enabled care developments 
All of the above are referenced in the main report as developments over the year and
report the data and demands on the services over the same period. 
4.5. Section 4: Resources
4.5.1. Social Work Resources had a net revenue budget of £219,616 million for 2023/2024. 
The priority of social work services is to ensure effective delivery of critical services,
complying with statutory legislation to protect vulnerable children, young people, and
adults in our communities.  Services have continued to be delivered to those assessed
as most at risk with the focus on public protection throughout the last year. 
4.5.2. There are several financial challenges which Social Work Resources continues to
manage including:-
 the financial impact of demographic growth and an ageing population
 the increasing numbers of people supported in their community with long term
health conditions
 an increase in Adult Support and Protection activity 
 an increase in the number of care experienced children and young people
 service user and carer expectations
 the Council’s requirement to achieve ongoing savings 
4.6.  Section 5: Workforce 
4.6.1. Social work and social care services are a diverse sector in terms of job roles, career
pathways and service structures.  The CSWO has a key leadership role in relation to
workforce planning and development, from both a local authority and partnership
perspective. 
4.6.2. A significant number of staff are projected to reach retirement age over the next ten
years and this, together with high turnover of staff and an ongoing requirement to retain
and increase numbers of qualified workers, presents a particular challenge.  The
Social Work Workforce Plan 2022-2025 aims to mitigate the risks of a diminishing
workforce against areas of growing demand by enhancing career pathways and
succession planning, and the establishment of a Care Academy to ‘grow our own’
workforce.  
355

Page 356

4.7. Section 6: Training, Learning and Development 
4.7.1. The CSWO is a member of Social Work Scotland (SWS), the professional leadership
body for the Social Work and Social Care professions.  The membership organisation
represents Social Workers and other professionals who lead and support Social Work
across all sectors.  It will influence and advise on the development of policy and
legislation and support the development of the Social Work and Social Care
professions. 
4.7.2. This section goes on to identify the CSWO role in learning and development, ensuring
registration requirements for the work force are met.  Identifies the role of the CSWO
in Significant Case Reviews and Learning Reviews from the Child Protection and Adult
Protection Committees.  The section also gives examples of all disciplines in relation
to specific requirements for newly qualified staff ongoing professional development
and leadership programmes all as part of the requirements for continuous professional
development and learning. 
4.8. Section 7: Looking Ahead
4.8.1. The following areas of activity are highlighted in the report which are likely to impact
the resource in the future:- 
 continuing financial challenges with expenditure exceeding allocated budgets.
Audit Scotland report published 17 May 2023
 IJB statutory duties set out in the Public Bodies (Joint Working) (Scotland) Act
2014 and other associated legislative duties to maintain a balanced budget. Audit
Scotland report published 6 April 2023
 workforce availability and capacity challenged by competitive labour markets
influencing the ability to recruit and retain staff across the social care sector. Audit
Scotland report published 26 October 2023
 Legislation:
 Children (Care and Justice) (Scotland) Bill – Stage 3
 National Care Service (Scotland) Bill – Stage 2
 Victims, Witnesses, and Justice Reform (Scotland) Bill – Stage 2 
4.8.2. Funding and budgetary pressures remain challenging as a result of additional demand
and increased costs of delivering services.  Implementation of the Sustainability and
Value Programme across social work services will require ongoing consultation with
members of the public, families, carers, and employees as service changes are taking
place. 
4.8.3. Community engagement and consultation continues to have an effective and direct
impact on shaping service priorities for the future.  A consultation programme for the
new strategic plan will take place during 2024/2025. 
5. Employee Implications
5.1. There are no employee implications associated with this report. 
6. Financial Implications
6.1. There are no financial implications associated with this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environmental
implications in terms of the information contained in this report.  
356

Page 357

8. Other Implications
8.1. There are no risk implications associated with this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function, or strategy, or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
9.2. There is no requirement for consultation in respect of this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
21 October 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 Working with and respecting others 
 Accountable, effective, efficient, and transparent 
 Ambitious, self-aware and improving 
 Fair, open and sustainable 
 Excellent employer 
Previous References
 None 
List of Background Papers
 Appendix 1 – Annual Report – Chief Social Work Officer, South Lanarkshire Council
2023-24
 https://audit.scot/uploads/docs/report/2023/nr_230517_local_government_overview.pd
 https://audit.scot/publications/integration-joint-boards-financial-analysis-202122
 https://audit.scot/publications/the-scottish-governments-workforce-challenges 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Liam Purdie, Head of Children and Justice Services and Chief Social Work Officer
Phone Ext: 4887 (01698 454887)
Email:  liam.purdie@southlanarkshire.gov.uk
357

Page 358

358

Page 359

1 
Chief Social Work Officer 
Annual Report 
2023-2024 
17
359

Page 360

2 
Contents 
Introduction          
Section 1:   Governance and Accountability    
Section 2:   Service Quality and Performance
I. Children and families
II. Adults
III. Criminal Justice
Section 3:   Challenges and improvements     
Section 4:   Resources         
Section 5:   Workforce 
Section 6:  Training, learning and development    
Section 7:   Looking ahead       
Appendix 1:  Performance Data and Trends     
Appendix 2:  Care Inspectorate Gradings for Registered Services 
360

Page 361

3 
Introduction 
The aim of Social Work Resources is to promote social welfare and provide effective care and
support to meet the needs of vulnerable people in South Lanarkshire. We are committed to
providing responsive and accessible services, with defined standards for service provision and
to supporting local people to maximise their potential, maintain their independence and
improve outcomes. 
The requirement for every local authority to appoint a professionally qualified Chief Social
Work Officer (CSWO), who must be registered with the Scottish Social Services Council
(SSSC), is contained within Section 3 of the Social Work (Scotland) Act 1968. The role of the
CSWO is to provide professional advice and guidance to the local authority’s Elected Members
and Officers in the provision of commissioned and directly provided Social Work services. The
CSWO also has responsibility for overall performance improvement and the identification and
management of corporate risks, as far as these relate to Social Work services. 
The CSWO is required to prepare an annual report of activity for the Chief Social Work Advisor
for Scotland. A summary report is published annually by the Scottish Government to aid
learning and the sharing of information nationally. 
All local councils have a duty under the Social Work Scotland Act 1968 to assess a person’s
community care needs and, where appropriate, to arrange any services they may require.
South Lanarkshire Social Work Resources, in partnership with community planning partners,
voluntary organisations and independent providers, offer a range of services designed to
enable, support, improve and protect the health and care of those accessing our services.
Self-Directed Support (SDS) is Scotland’s mainstream approach to adult social care and the
Children and Young People (Scotland) Act 2014 places Getting It Right for Every Child at the
centre of assessing the wellbeing needs of children and young people. 
In addition to assessment, Social Work Resources commission a wide range of local private,
not for profit and voluntary sector providers together with a range of specialist services from
within and outwith the South Lanarkshire area. There are thirty-six independent care homes
for older people, thirteen care homes for adults with a range of support needs, and twenty-
three children’s care homes operating within the council area. Additionally, we have a range
of care at home, day services and supported living providers operating across our localities. 
Throughout 2023-2024 Social Work Resources activities included: 
• Supervision and monitoring the protection of vulnerable children and adults and wider
public protection services.
• Providing assessment, specialised assessment, and support
• Providing targeted services for vulnerable children young people, adults, and their
carers
• Working with those who are subject to requirements within justice and mental health
legislation.
• Reinforcing capacity across all social work services to meet statutory requirements 
361

Page 362

4 
As CSWO for South Lanarkshire I will continue to progress our priorities in areas including: 
• Public protection for children and adults
• Multi-agency public protection arrangements
• South Lanarkshire Integration Joint Board (IJB) and development meetings for health
and social care integration
• Health and Social Work Governance Group
• Health and Care standards
• Developing and supporting our profession and workforce
• Oversight and management of the Social Work Risk Register 
• Data Protection, GDPR (General Data Protection Regulation), Information Governance
• Procurement, contract compliance/monitoring
• Eligibility criteria/prioritisation
• Self-directed Support (SDS)
• Community Justice
• Children and Young People’s legislation
• Carers (Scotland) legislation
• Care Inspectorate inspections and follow up improvement action plans.
• Equality, Diversity, and Inclusion
• Health and Safety 
Households continue to be significantly impacted by the cost-of-living crisis with all sectors of
society seeing prices rise. We will do all we can to support our communities in these difficult
times, whilst recognizing the significant challenges for council services also experiencing
increased pressure by rising costs. 
The ongoing development of Social Work services and our achievements in challenging times
rely on the continued commitment of our staff, statutory and third sector partners, the local
community and support of the council’s Elected Members across all parties, who continue to
advocate for the service. 
The leadership governance and support through the Social Work Committee and the council
Executive Committee should also be noted as well as the recognition of the role of Social Work
and Social Care through the Integrated Joint Board. The chairs and depute chairs and the
committee and board members of the respective committees have always demonstrated a
commitment to appropriate challenge support and accountability in ensuring standards and
risks are understood and prioritised in challenging times. 
The leadership and direct support in formal 1-2-1s with the council Chief Executive, who has
a programme of formal meetings and an open-door approach for the Chief Social Work Officer
reflects this commitment to delivery of services that permeates throughout the resource. This
is also replicated in the direct management of the Chief Officer / Director, Health and Social
Care of the South Lanarkshire University Health and Social Care Partnership. 
I extend my thanks to everyone for their efforts during 2023-2024 and I look forward to working
together on shared agendas during the year ahead. 
362

Page 363

5 
Liam Purdie
Chief Social Work Officer
30 October 2024 
363

Page 364

6 
Section 1: Governance and Accountability 
1.1  Community Planning Partnership 
1.1.1 South Lanarkshire Council is part of the South Lanarkshire Community Planning
Partnership (CPP). A wide range of partners contribute to a well-established
Partnership Board which has a key role in progressing community planning in this area.
South Lanarkshire Community Planning 
1.1.2  The board provides strategic leadership and oversees the activity of partners in
achieving the agreed vision and outcomes within the Community Plan 2022-2032. It
has established the following thematic partnerships to improve the quality of life of
South Lanarkshire residents: 
• Children's Services Partnership
• Health and Social Care Partnership
• Community Learning and Development Partnership 
1.1.3  Collaborative working with partners helps to maximise the use of scarce resources and
develops service models that specifically focus on delivering the priorities set out in
the Community Plan. 
1.2  South Lanarkshire Council 
1.2.1 There are 64 council members representing the 20 multi-member wards across South
Lanarkshire. The composition of the council as of 5 May 2022 is: 
Political Party Number of Elected Members 
Scottish Labour Party 25
Scottish National Party 25
Scottish Conservative and Unionist Party 7
Scottish Liberal Democrats 3
Independent Group 2
Greens 1
Independent  1 
Source: Political composition of the council - South Lanarkshire Council 
1.2.2 The council’s vision to “improve the lives and prospects of everyone in South
Lanarkshire” remains at the heart of the Council Plan 2022-2027, along with our
priorities which are focused on: 
• People – we need to put people first and reduce inequality. 
• Planet – we need to work towards a sustainable future in sustainable places. 
• Progress – we need to recover, progress, and improve. 
1.2.3 Social Work Resources is one of five council resources, the others being: Community
and Enterprise Resources; Finance and Corporate Resources; Education Resources
and Housing and Technical Resources. All Resources work together in support of the
Council Plan which can be accessed at the following link: Connect 2022-27
364

Page 365

7 
1.2.4  In common with other Council Resources an Internal Statement of Assurance is
produced annually covering general good governance, internal controls, information
governance and systems of governance and control. 
1.2.5 The resource contributes to the council-wide self-assessment and improvement
programme, to provide assurance of the council’s continuous improvement and best
value commitments. Each year Annual Performance Spotlights are produced which
summarise how the council has performed in achieving Council Plan outcomes. 
1.2.6 Each Resource prepares an annual Resource Plan which reflects the aspirations of
the Council Plan and the Community Plan and details the work, achievements, and
ongoing performance activity of each service. In addition, the Resource Plan
necessarily reflects the statutory relationship between the IJB and the council with
respect to adult and older people’s social care. The Social Work Resource Plan can
be found at the following link: Social Work Resource Plan 2024-2025 
1.3  Social Work Resources 
1.3.1 The principal role and purpose of the Social Work service is contained within the Social
Work (Scotland) Act 1968, which gives local authorities the responsibility of “promoting
social welfare”. The Social Work service has a statutory duty to provide care and
protection to the most vulnerable people across South Lanarkshire. 
1.3.2 The CSWO role is understood and valued within the council. The CSWO provides
professional advice directly to the Chief Executive of South Lanarkshire Council on
statutory service delivery and on matters relating to the profession. This professional
advice and guidance also extend to local Elected Members, officers within other
resources of the council and to senior staff within partner agencies. There is a clear
line of accountability including support and challenge that is understood by the Council
Leader, the Chief Executive and the five Directors of the Corporate Management
Team. 
1.3.3 Social Work Committee consists of 26 Elected Members and deals with most of the
business relevant to the CSWO role, as well as strong links to other key member
groups including relevant audit, scrutiny, equality, and member officer working groups.  
1.3.4 The CSWO holds the position of Head of Children and Justice Services, is a member
of the Social Work Senior Management Team (SMT) and a standing member of the
IJB. The role is integral in the supervision and monitoring of the protection of vulnerable
children and adults and serving as a conduit between the IJB and public protection
activity, reporting annually on the discharge of statutory duties. 
1.3.5 The CSWO is a prominent member of the Chief Officers Group (Public Protection)
chaired by the Chief Executive of South Lanarkshire Council, the group promotes a
culture of accountability through robust governance arrangements and ensures that all
agencies individually and collectively are working to protect adults and children at risk. 
365

Page 366

8 
1.3.6 The CSWO leads, in partnership with other Council Resources, the co-ordinating,
gathering and submission of information within timescale to requests under the
Redress for Survivors (Historical Abuse in Care) (Scotland) Act 2021 and the Scottish
Child Abuse Inquiry. 
1.3.7 The CSWO undertakes rigorous monitoring of social work operational services, risk,
performance and practice through the Joint Health & Social Work Governance Group.
Assurance is provided to the council’s Chief Executive, Elected Members and the
public through regular reporting of performance to the Social Work Resources
Committee and the Performance and Review Scrutiny Forum. 
1.3.8 The CSWO actively participates in a range of influential decision-making forums
providing a significant leadership role in shaping the overall strategic direction of
services, including: 
Structure Role
Community Planning • Community Planning Partnership Board
• Safer South Lanarkshire Board
• South Lanarkshire Community Justice
Partnership
• South Lanarkshire Alcohol and Drugs
Partnership
• Violence Against Women and Girls (Gender
based Violence Partnership)
Council  • Social Work Resources Committee
• Performance and Review Scrutiny Forum
• Joint Health & Social Work Governance Group
• Learning and Development Boards
• Corporate Management Team
Children’s Services • Getting it right for South Lanarkshire’s Children
(GIRSLC) Partnership Group
• The Promise Board 
• Local Government and The Promise (arranged
by COSLA)
• Children’s Service Partnership Planning
(CSPP) Leads Group (SG)
Public Protection • Chief Officer's Group
• Child Protection Committee
• Adult Protection Committee
• MAPPA (Multi Agency Public Protection
Arrangements) Strategic Oversight Group
Integration Joint Board  • IJB Board
• IJB Performance and Audit Sub Committee
• Health and Care Senior Management Team
• Support, Care and Governance Group
• Care Homes Assurance Tactical Group 
366

Page 367

9 
1.4  South Lanarkshire University Health and Social Care Partnership (South
Lanarkshire University HSCP)
1.4.1 The Director, Health and Social Care, supported by the CSWO, has a lead role for
Social Work functions within the South Lanarkshire University HSCP. 
1.4.2 The South Lanarkshire IJB is responsible for the strategic direction of the delivery of
health and social care for adults and older people in South Lanarkshire and is
supported by the South Lanarkshire University HSCP to operationally deliver
community-based health and social care services. 
1.4.3 Staff deliver statutory services for adults and older people under a range of legislation
including the Social Care (Self-directed Support) (Scotland) Act 2013, Adult Support
and Protection (Scotland) Act 2007, Mental Health (Care and Treatment) (Scotland)
Act 2003, Adults with Incapacity (Scotland) Act 2000. 
1.4.4 Child and Family and Justice Social Work services are not included in the South
Lanarkshire Integration scheme and sit outside the South Lanarkshire University
HSCP. 
1.4.5 A Performance and Audit Sub-Committee assists with the governance and
accountability arrangements in key areas of work which are led by the IJB, including: 
• The approval and implementation of a Strategic Commissioning Plan (SCP)
• The establishment of locality planning 
• Governance and accountability arrangements
• The production of an annual performance report 
1.4.6 The South Lanarkshire Strategic Commissioning Plan (SCP) 2022 - 2025 sets out how
health and social care services will be delivered in a more integrated way to improve
the quality of support for people. Crucially, the plan sets out how services will be
delivered against twelve priority areas identified by communities themselves. 
1.4.7  Locality implementation plans set out how the priorities outlined in the SCP will be
operationalized within each of the four localities, addressing their specific demographic
challenges and health and social care needs of the population. The priority areas within
the locality plans include: 
• Greater emphasis on early intervention, prevention, and health inequalities
• Addressing mental health and addictions
• Supporting carers
• Improving unscheduled care and optimising intermediate care 
1.4.8 The CSWO has responsibility for ensuring governance and decision-making
arrangements are in place to support the SCP ambitions. The CSWO provides
professional leadership and monitors the delivery of the South Lanarkshire University
HSCP delegated statutory functions through the Health & Social Work Governance
Group and within the SMT.
367

Page 368

10 
1.4.9 Below is the structure chart that Social Work Resources and the South Lanarkshire
University HSCP operates within. 
Director of Health and Social Care 
ead of  ealth and
Social Care                                                   
•                      
•           
•                                            
•                       
•              
•              
•                   
•            
•                  
•             
•                 
•                    
•                                                    
•                
•     
•                
•             
Chief  inancial
Officer                                               
ead of
Commissionin  and 
erformance
•                
•                   
•                       
•            
•   
•              
•           
•      
•                
•              
urse  irector
Community
•                  
•                    
•              
•                
•                  
•                                            
edical  irector                                                                 
•            
•                 
•                     
•                    
ead of Children   
ustice Services
CSWO
•                                                 
•           
•                  
•                                
•                    
•       
•               
•                          
•                   
•            
•                  
•                    
•      
•               
•     
•                
•                    
•                
•                                     
•                 
•          
•                  
•            
•                                   
368

Page 369

11 
Section 2: Service Quality, Performance and Challenges 
2.1  Service Overview 
2.1.1 Service quality, performance management and reporting are intrinsic parts of the
duties of the CSWO. The CSWO has responsibility to respond to Care Inspectorate
reports and findings from local and national activity, addressing the requirements of
internal and external audit and reporting on progress against outcomes and follow-up
actions from this activity. This includes discussion with the Chair of Social Work
Committee and presentation to Social Work Resources Committee on inspection
activity twice yearly. Further information on current inspection activity can be found in
Appendix 2. 
2.1.2 Engagement with service users and communities remains strong and is supported by
the South Lanarkshire Health and Social Care Forum. This is an independent group of
community volunteers who work to engage health service and social care users,
carers, and communities to improve local services. The Forum also supports wider
public involvement in planning and decision-making, and keeps local people informed
about the range and location of services. 
2.1.3 The public launch of Care Opinion took place on 8 December 2023. All services
including adult and older, children, and justice are collaborating with Care Opinion, a
non-profit, independent feedback website that helps service users share honest and
anonymous stories about their experiences with our services. The process is
specifically designed to consult and engage with service users, with feedback
published to promote a culture of transparency, learning and sharing of good practice. 
2.1.4 South Lanarkshire University HSCP is committed to pro-actively ensuring that we
deliver our legislative requirements in relation to the Carers (Scotland) Act 2016. Two
strategic documents in relation to our commitments to carers have been published
during 2023/2024, these include: 
• Carers Strategy 2023-26 (Carers Strategy 2023-2026 Carers and caring - South
Lanarkshire Council)
• Short Breaks Statement (Short Breaks Service Statement Carers and caring -
South Lanarkshire Council) 
2.1.5  Co-location working arrangements and multi-disciplinary forums have been positively
established to develop locality-based exploration of carer’s needs. Additional to that,
the establishment of the Carers Lead post has facilitated the workforce to be upskilled
in relation to carer’s rights and local authority duties under the Carers (Scotland) Act
2016. 
2.1.6 During this reporting period, 5,400 adult carers engaged or were supported by
Lanarkshire Carers, a similar number to 5,426 in 2022/23. 
369

Page 370

12 
Case Study 
Lanarkshire Carers recently supported a known carer who was in crisis; caring at
home for her terminally ill husband, the carer wished to support her husband who
had expressed his wish to remain at home during his illness. The Carer Support
Worker (CSW) from Lanarkshire Carers discussed the situation in detail with the
carer and took proactive steps to liaise directly with Social Work staff and develop a
carer’s support plan to enable the carer to sustain her caring role. Positive outcomes
were secured as a result of the supportive intervention, these included: 
• Sustaining the capacity of the carer to fulfil caring responsibilities effectively.
• Navigating the caring role alongside the carer’s own health issues.
• Decreasing the stress levels and avoiding burnout of the carer. 
With Social Work support, the carer was able to access immediate respite support
at the point of crisis, and further arrangements were put in place on return to support
with ongoing care at home, along with regular respite support. 
Feedback from the carer:
“Thank you again for all your help, I am going to be able to keep my husband at
home for now like I hoped I could with support, and I am going to be able to get
some time out regularly as well, so I don't completely burn out.” 
2.2 Children’s Services 
2.2.1 Children’s Services promote the welfare and development of children, young people,
and families to support them, wherever possible, to remain together within in their own
communities. 
2.2.2  Social Work Resources has a duty to protect children. Whilst this is a shared
responsibility with other agencies and the community, Social Work has the
responsibility to investigate allegations of child abuse. These responsibilities are
carried out in the framework of jointly agreed child protection (CP) procedures. 
2.2.3 Children’s Services carried out a range of activities in 2023-2024, examples of which
include: 
• Protecting children by undertaking 725 CP investigations between 1 August 2022
– 31 July 2023. On 31 July 2023, there were 106 children on the CP Register.
• Prepared 278 reports for children who were supported through the Children’s
Hearing system between 1 April 2023 – 31 March 2024.
• As of 31 July 2023, the council looked after 732 children. Of these children 15%
were looked after at home with parents, 47% by friends/relatives (kinship), 26% in
foster placements and 12% were looked after in a residential setting. 
2.2.4 The Promise is already well embedded in our work in South Lanarkshire. The Promise
Board chaired by the Council Chief Executive, brings together the highest level of
corporate parents to ensure The Promise commitments are central to all we do. The
Promise Board’s vision is to make sure everyone plays their part in supporting care
experienced children and young people as they grow and develop and assists the
370

Page 371

13 
council and partners in continuing to fulfil its legal obligations and responsibilities
towards looked after children and children leaving care. It reports directly to the
Community Planning Partnership (CPP) and operates to a set of principles on which
to lead and challenge the progress of the corporate parenting agenda and meet
collective, corporate parenting responsibilities. 
2.2.5 South Lanarkshire Council is committed to the overall vision of The Promise and work
is underway on key aspects such as ‘a good childhood’, the voice of care experienced
children and young people and the whole family approach. The work to deliver real
and meaningful change as aspired to by The Promise is led by the multi-disciplinary
Keeping the Promise Thematic Group of which the Champions Board are members. 
2.2.6 The Champions Board is a group of young care experienced people who are supported
to come together to engage directly with those who make key decisions about the care
system. The vision for the Champions Board is one where corporate parents build
genuine, trusting relationships with care experienced young people in their area and
improve the quality of care and support for care experienced young people. 
2.2.7 The Champions Board has been refreshed and relaunched making it more visible to
all care experienced children and young people, and to corporate parents. Supported
by two Promise Development workers with lived experience, the Champions Board
has been instrumental in ensuring the meaningful involvement of care experienced
young people in key decision-making processes including helping to design improved
paperwork with less jargon for social work assessments and reviews. They have
worked with Housing colleagues to develop and deliver a dedicated Housing Protocol
that will ensure young people leaving care have the best support available when
moving into an independent living situation. A ‘Mini Champs’ group has been formed
and work has been undertaken with care experienced children and young people in
schools to improve their opportunities for their voice to be heard. As a result of their
work, Corporate Parents have agreed to be more visible and accessible to the
Champions and a programme of engagement is in place, including meetings with the
Council Chief Executive. 
2.2.8 A well-attended Corporate Parenting event was held in November 2023 with over 170
corporate parents and partners present at the “Connecting with Children’s Rights”
conference in Hamilton. As part of the day, round table discussions were held
focussing on the theme of making children and young people visible with the feedback
being incorporated into future planning. 
2.2.9 An event to celebrate Care Day was held in February 2024, where young people from
our Champion’s Board hosted the event and challenged corporate parents to say how
they were keeping South Lanarkshire’s Promise. The successful event brought
together at least 60 care experienced children and young people and 60 corporate
parents to improve the understanding and visibility of each other. Planning for Care
Day 2025 has already begun with the Champions Board taking the lead role in the
planning and content of the day. 
371

Page 372

14 
2.2.10 Whole Family Wellbeing (WFW) investment by The Scottish Government has been
instrumental in supporting whole system transformational change required to reduce
the need for crisis intervention, and a shift towards prevention and early intervention.
Year one funding of £1.827million in South Lanarkshire has supported the Children’s
Service Partnership assess local gaps and opportunities and plan activity accordingly,
with a view to laying the groundwork for scaling up transformational activity in
subsequent years. The funding is intended for new work and additionality of resource
to support transformation in-line with the National Principles of Holistic Family Support
and our ambition to ‘Keep the Promise.’ 
2.2.11 A WFW Fund Partnership Steering Group has been established to review the design
and delivery of Children’s Services in South Lanarkshire, promoting best use of WFW
funding. Proposals include extending the Pathfinder initiative in schools, contribution
to the Family Support Hub model across the four localities in South Lanarkshire from
the centralised Hub model, investment in the parenting support groupwork pathway
and extending Family Group Decision Making (Children 1st) as part of the WFW
approach. 
2.2.12  Since opening in 2022, the Hubs have had such a positive impact on families that
families themselves are now the second largest referrer to this support. From 1 April
2023 to 31 March 2024 Family Support Hubs dealt with 69% of incoming referrals
made to Social Work, significantly reducing the number of initial assessments that
would be required by staff in a more formal setting. 
2.2.13 Over the last 18 months, provision established has included: 
• Family Group Decision Making sessions are offered to all families identified by
early years multi agency networks, as needing extra help during pregnancy to
reduce the number of babies, children and young people living away from their
families. Peer Support Workers are providing advice and guidance to pregnant
mothers and their partners on a range of issues, including drug and alcohol use.
100% of families report they experience improved outcomes. 
• Social Work and NHS colleagues have supported parents to identify their strengths
to help combat the risk of neglect for their children and also to identify where they
can make things better as a family. Social Work staff have completed specialist
training on the use of a resource called the ‘Working with Neglect Toolkit.’  A forum
has been set up for staff which is organised by the Council’s Child Protection
Officer and there are plans to extend the training to School Nurses, Health Visitors
and Family Nurses across NHS Lanarkshire. 
• Mental Health supports and community access within South Lanarkshire have
benefited from around £800k from the Scottish Government Community Mental
Health and Wellbeing Fund. The fund is intended to improve accessibility to
support and services to children and young people and help them to improve their
mental health and wellbeing by developing coping strategies and resilience. The
number of community-based mental health initiatives for our children and young
people has been extended with services including Kooth, an online wellbeing and
372

Page 373

15 
counselling support for children and young people, the Blues programme, and the
delivery of peer support programmes in schools through mental health and
wellbeing workshops for families and staff. In addition, there has been an increase
in capacity to deliver focused supports to the most vulnerable children and young
people through the Trauma Recovery Service and additional practitioners to
support those who are care experienced. 
• To ensure care experienced young people receive the best emotional wellbeing
support possible, a ‘Pathway’ for those young people who are ready to leave care
has been developed in collaboration with mental health support services, with
plans to offer the right level of support as early as possible when a need is
identified. This approach, which has been led by the School Nursing Team, has
supported 102 young people since August last year. Two thirds of those young
people who were supported told us that this had helped to improve their mental
health and emotional wellbeing. 
• Care experienced young people aged over sixteen have been supported to actively
manage their Child Trust Fund and/or Junior ISA savings accounts currently
administered by the Share Foundation. The council has been working with the
Share Foundation to identify unclaimed Child Trust funds and Junior ISAs and is
endeavouring to unite those accounts with their owners. In addition, eighteen care
experienced young people have so far taken part in the Share Foundation’s 6-step
financial education course Stepladder of Achievement. All those who completed at
least one step had a contribution made to their Child Trust Fund and the five who
completed all six steps received £1500 each. In total, £11,350 has been added to
trust funds by May 2024. 
2.3  Justice Services 
2.3.1 South Lanarkshire Justice Social Work service vision statement is ‘To be a smart, fair
and progressive justice social work service with those who we serve and their families
at the centre of it.’ 
2.3.2 Justice Social Work services work within the context of The South Lanarkshire
Community Justice Partnership and provide services that meet the national aims and
priorities set out within the National Strategy for Community Justice. The key priorities
of the service are: 
• Enhancing early intervention and alternatives to custody 
• Ensuring those given community sentences are supervised and supported,
promoting desistance, and enabling rehabilitation. 
• Managing those that present the highest risk of harm to others within a robust
public protection framework. 
• Providing restorative justice approaches which are accessible and visible to our
communities. 
2.3.3 Justice Social Work provide a wide range of statutory services. These include: 
373

Page 374

16 
• Diversion 
• Whole Systems Approach (16-21 years old) 
• Bail Supervision, Diversion and Court Services 
• Drug Testing and Treatment Orders 
• Caledonian System (Domestic Abuse Programme for men, women, and children’s
service) 
• Moving Forward Making Changes (Sex Offending Programme)
• Community Payback Orders and Unpaid Work Services 
• Adult Throughcare Services
• Recovery Orientated Justice Service 
2.3.4 Justice Services carried out a range of activity in 2023-2024, examples of which
include: 
• 518 referrals were supported by substance misuse services, following a referral for
alcohol or drug misuse.
• 705 Community Payback Orders with Unpaid Work requirements commenced.
• 316 Diversion from prosecution referrals, which have increased by 14% from 288
in 2022-2023.
• 1799 Justice Social Work reports were submitted to the Courts to inform
sentencing options. Of these 98% have been submitted within timescales –
exceeding the target set by the Scottish Government of 95%
• 13% increase in bail supervision assessments and 7% increase in Bail Supervision
orders this year, as the Pan Lanarkshire Court Services continues to develop their
Bail Supervision and Electronic Monitoring assessment service.
• The four locality-based Justice teams currently work with over 750 individuals
subject to Supervision by the Courts and Parole Board. 
• 82% of individuals made subject to a Community Payback Order (CPO) are seen
by the service within one working day and 85% have their first meeting with their
case manager within five working days, far exceeding the Scottish Government
target of 75% for both. 
2.3.5 Quality assurance dashboard reports on all statutory service provision allow decision
makers the opportunity to identify trends in workloads and any reduction in orders and
service provision. The quality assurance model has been developed to focus on annual
MAPPA level 1 audits: annual Bail Supervision and Diversion from Prosecution and
Significant Learning Reviews. 
2.3.6 Justice Social Work staff have a responsibility to assess need and identify risks with
those they work with. Underpinning this work is a strong focus on relationship-based
practice which provides safe and effective interventions and challenges offending
behaviours. 
2.3.7 Pan Lanarkshire Justice Social Work continue to assess all bail opposed persons for
their suitability for bail supervision. Justice Social Work have developed partnership
working with SACRO as part of the Alcohol and Drug Partnership arrest referral,
diversion, and bail supervision commissioned service. This service seeks to support
374

Page 375

17 
those with substance use issues at the point of police custody, court appearance and
diversion with peer mentors and assertive outreach into recovery communities. This
supports our public health approach to Justice services providing intervention at the
earliest opportunity.   
2.3.8 In December 2023 an Alcohol and Problem-Solving Court in Hamilton Sheriff Court
was introduced supported by the newly created Recovery Orientated Justice Service
(ROJS). The aim of this court is to address substance use related offending whilst
taking a public health approach that prevents further criminalisation of vulnerable
people whose offending is related to addiction. Funding has been awarded from
CORRA and SLC Alcohol and Drug Partnership. The ROJS team demonstrates an
integrated health and social work model supported with third sector peer mentor
support. This public health approach aligns directly with best practice identified within
the Scottish Government’s Changing Lives 2022 report. In March 2024 independent
evaluation was secured with staff from University of West of Scotland to assess the
impact of the problem-solving court with this particular Justice Social Work model. In
addition, this work will evaluate whether there has been a successful system change
through our approach. 
2.3.9 Our project outcomes align to the Scottish Governments (SG) Logic Model to reduce
drug deaths and harms. We aim to commit to:  
• Reducing drug and alcohol related deaths South Lanarkshire
• Reducing the volume of Community Payback Order breaches and non-
completion 
• Preventing those in conflict with the law proceeding further into the justice system
• Reducing remand and short-term custodial sentences
• Providing long term Structured Deferred Sentence options for those with
problematic drug and alcohol use. 
2.3.10 Justice Social Work undertake public protection functions as a Responsible Authority
MAPPA partner. This includes collaborative working with Police Scotland, SPS,
housing, health services, CAReS (Community Addiction Recovery Services), and adult
services. This report period has seen an increase in MAPPA level 1 cases (9%) as
well as an increase in Category 3 cases (non-sexual offences) in which those that
present the greatest risk of harm require to have a multi-agency approach to their risk
management.  
2.3.11 A holistic approach is taken to ensure programmatic work addresses inappropriate
behaviour but also ensures the safety of persons harmed. The Caledonian programme
is for persons convicted of domestic abuse offences and the Moving Forward Making
Changes programme is for persons convicted of sexually harmful behaviour. The
Caledonian Systems Delivery Team (CSDT) is delivered in partnership with CIRCLE
and is supported by Women’s Aid South Lanarkshire East Renfrewshire (WASLER)
who support the women and children impacted by the behaviour of men. 
2.3.12  During the period of 2023-2024 WASLER engaged with local communities to raise
awareness of domestic abuse to support the wider community to have greater
375

Page 376

18 
knowledge and understanding. Between April 2023 and March 2024 there were 235
Caledonian cases, 120 being new assessments with the remaining 115 being
continued cases from the previous year.  CIRCLE provide support to children who have
been impacted by domestic abuse. Recent reports for the time period April 2023 to
March 2024, supported 13 families, 17 parents and 34 children and young people
(includes direct 1:1 support, sibling and whole family support) 
2.3.13 The Whole Systems Approach (WSA) team works with young people aged 16-21 who
find themselves in conflict with the law. During 2023-2024 the team have worked with
young people providing bail support, bail supervision, diversion from prosecution,
structured deferred sentence, CSO and CPO supervision. They have also continued
to provide support to young people who are either living within a secure care setting or
within HMP/YOI Polmont (on remand or when serving a sentence). 
2.3.14 Unpaid Work has developed its kitchen learning hub services through the introduction
of a permanent kitchen hub coordinator supporting cooking and nutrition skills as part
of Community Payback Order ‘other activity’ component. During the summer of 2023
fresh produce was provided to the kitchen from our dedicated education garden, based
within Auchentibber. This work was then presented during open days with members of
the public across South Lanarkshire between June to August 2023 to share information
and enable people to gain a better understanding of Community Payback Orders and
the work people do to contribute back to society.  
2.3.15 Justice Social Work Unpaid Work service also developed a six-week pilot group work
initiative for Armed Forces veterans who enter the Justice System. The Positive
Futures initiative recognised the challenges people face in relation to substance use,
employability, healthy living and mental health. The pilot, supported by Who Dare’s
Cares Veteran charity, was received well with positive feedback from those that
attended the group, promoting a wider network of support where required. South
Lanarkshire Council, in its commitment to the Lanarkshire Armed Forces
Covenant, continues to ensure the correct support is available to veterans within
Justice Services by signposting and referring them on to a range of specialist veteran
organisations. The learning from this programme has enabled the service to develop
and expand its group work activities more generally to people on unpaid work orders. 
2.3.16 A Justice Services and Recovery Orientated Support Services development day event
was held (date to be added) to consolidate South Lanarkshire Justice Social Work’s
commitment and passion to progressing a public health approach to those with
substance use and their families to keep vulnerable people out of the justice system
as long as possible. The day brought together 13 local recovery and Alcohol and Drug
Partnership’s commissioned services, Police Scotland, Alcohol and Drug Consortium,
CAReS and Children and Families and Adult Services. A world cafe took place to
provide staff the opportunity to connect, share and learn about the recovery services
in Lanarkshire. Following the event CAReS and Justice Services held a joint
development session in May 2023 to explore opportunities for enhanced joint working
arrangements. This session enabled staff to better understand each other's roles and
responsibilities and the context of outcomes from learning reviews involving drug
related deaths within South Lanarkshire. 
376

Page 377

19 
2.3.17 Women’s Justice Service in South Lanarkshire is a centralised social work team who
provide one to one support and operate four locality-based women’s hubs, weekly.
The hubs are aimed at supporting women who have been involved with the adult
justice system. Since January 2023 a Structured Deferred Sentence service has been
operating through Glasgow Sheriff Court, which provides females involved in the
justice system with intensive support over three to six months with a view to addressing
their risks and needs before allowing a prompt exit from the justice system. 
2.4 Adult and Older People Services 
2.4.1 Social work and social care services are delivered to adults and older people by a
range of partners including other council resources as well as partners in health, the
voluntary sector and independent sector. Social work staff fulfil duties under the law,
including Social Care (Self-directed Support) (Scotland) Act 2013, Adult Support and
Protection (Scotland) Act 2007, Mental Health (Care and Treatment) (Scotland) Act
2003, and Adults with Incapacity (Scotland) Act 2000. Each plays an important role in
guiding how some services are delivered. Assessment and care management staff
collaborate with partners to protect and reduce the risk of harm to adults and assess
the care needs of service users and their carers to plan services to meet those needs. 
2.4.2  Adult and Older People’s services conducted a range of activities throughout 2023-
2024 examples of which include: 
• Supporting 3,859 Adult Support and Protection (ASP) inquiries, which led to 1,546
ASP investigations being instigated.
• For welfare guardianship orders, visits have been maintained at a good level over
the course of the year, with 94% of supervising officer visits being held within
timescale.
• Supporting up to 2,000 older people at any time in long-term care placements
• Supporting 1,074 people with a learning disability to live in their own communities
• Working with 462 requests to support individuals with a mental health problem who
were referred to Community Mental Health Teams 
2.4.3 The Self-directed Support (SDS) agenda has continued to be driven forward within
South Lanarkshire for both carers and supported people with the focus on the SDS
Standards. During the reporting period, there has been significant investment in the
wider Social Work workforce involved in SDS, in relation to worker skills, knowledge,
practice issues and knowledge of local and national services. These methods have
been multi-modal: 
• New dedicated Self-directed Support three day in-person training programme for
new and existing staff
• Upskilling for staff via three weekly online briefings, which are recorded and
accessible also by third sector partners. 
• Worker focus groups to hear directly from colleagues about their needs in relation
to supporting SDS practice. 
• Updating of staff information available on intranet 
377

Page 378

20 
• Updating of public information available on internet 
• Engaging with ILF Scotland for bespoke in-person coaching sessions 
2.4.4  Organisationally, work is ongoing to ensure full financial compliance, quality,
monitoring, and control mechanisms are in place. The SDS Finance Team support
local office staff with all aspects of support planning, which provides greater
transparency of financial spend and governance of the SDS approach. The new
centralised model of monitoring and reviewing direct payments for all client groups,
previously the responsibility of individual social workers, has proved very successful in
terms of financial governance with £2.4 million recovered in this period and further
protection of public monies. This approach ensures that any issues arising such as
potential misuse of public monies or Adult Support and Protection issues are
highlighted at an early stage allowing appropriate actions to be taken to protect the
council, supported persons and carers. 
2.4.5 Work has continued to embed the new Home First service, which was introduced in
2022 to provide short-term reablement and rehabilitation service to adults for a period
of up to six weeks with a focus on maximising individual choice, control, and
independence.  Focused recruitment activity has been implemented across all
localities despite a challenging labour market. During 2023-2024, 900 service users
received support from the Home First service, with 37% less care service required on
completion of their Home First journey following reablement and rehabilitation
supports. 
2.4.6  The wider Care at home service has continued to manage recruitment challenges
whilst embedding key priorities arising from its modernisation agenda.  An evaluation
of the Home Carer role resulted in the regrading of the workforce in recognition of the
increasingly complex role undertaken by this vital staff group; the service embarked on
a procurement process for commissioned Care at Home and Housing Support services
for the next 10 years, with the first of these contracts awarded to successful providers
from 1 July 2024; and, the service made significant progress in addressing outstanding
assessments and reviews that arose during the pandemic. This activity has ensured
service users have choice and control over the services required to meet their needs. 
2.4.7  Transformation and service improvement has progressed with the opening of a new
state-of-the-art care facility, Blantyre LIFE, in March 2023. This model of health and
care delivery has increased the range of choice and options available to support people
to live well in the community. Patients who no longer require in-patient treatment, have
been assessed as clinically fit for discharge from hospital, and have rehabilitation
potential, can be admitted to the Intermediate Care unit for a maximum of 42 days.
The average length of stay for service users over the past year is 27 days which is a
significant improvement from the previous test of change and temporary model which
averaged 44 days. As the service is exceeding the initial flow target of 42 days, it has
the potential to manage an increase in the volume of people and is contributing to
freeing up in-patient services within the NHS. 
2.4.8 The Campus is becoming a focus for the South Lanarkshire University HSCP’s work
with universities to align research and learning with direct practice. Initial engagement
378

Page 379

21 
work, for example, with the National Robotarium at Heriot Watt University has identified
the site as a “living lab” which will provide opportunities for both academic and South
Lanarkshire University HSCP’s staff to work together to test care models which will
bring benefit to not just South Lanarkshire citizens, but potentially contribute to wider
academic and practice learning. Blantyre LIFE campus has facilitated visits from other
local authorities, partnerships, and universities including a group from the University of
Adger, in Kristiansand, Norway. The campus has been able to demonstrate the
progressive model in practice and the partnership has been invited to showcase the
work at key conferences including NHS Scotland’s Winter Summit National Event and
Holyrood's Digital Health and Care Conference 2024. 
Service User Feedback
JB stated “This place has really given me my confidence back and I am so pleased
I agreed to come. I am going to return to driving when I go home”. JB was assessed
as requiring care at home support following a hospital admission. 
2.4.9 Technology Enabled Care (TEC) continues to provide health and care services to
people in their own homes, or near to home, to help them live independently, safely,
and well at home for longer. The TEC team’s key services include telecare, Connect
Me remote health monitoring service, and Near Me video consultations. South
Lanarkshire’s TEC will work with partners in 2024 on an Amazon Healthcare Telecare
Project that will include a test to link smart speakers to digital alarm receiving centres
enabling service users to voice activate alert alarms. 
2.4.10 The provision of alert alarms and telecare peripherals continues to increase year on
year with 2,824 requests received in 2023-2024, compared with 2,276 requests
received in 2022-23. 33% of requests received were categorised as urgent (hospital
or integrated care discharges; adult support and protection; end of life care).
Installation of urgent requests occur within 1 to 2 working days after screening and
approval and standard request within 5 to 10 working days. 
2.4.11 The TEC team has recycled 1,322 digital alarms at a saving of £214,164 (each digital
alert alarm costs £162) by monitoring the digital alert alarm device management
platform and highlighting alarms not permanently connected to a power supply
permanently. 
2.4.12 A range of training to upskill health, social care and third sector staff has been
completed and enables participants to:  
• Have confident conversations with service users/patients and carers about
technology enabled care options to support health and wellbeing.
• Understand the role of technology enabled care in assessment, support planning
and managing risks.
• Understand the role of technology enabled care in promoting self-management and
prevention of long-term health conditions.
• Understand the benefits of technology enabled care to patients/services, carers,
staff, and our organisations.
379

Page 380

22 
Case Study
Mrs A had a fall, sustained a broken shoulder, and had delirium which impacted on
her cognition. Mrs A lives with her husband who works part time. Until her recent
fall, Mrs A was managing well. Mr A is concerned about his wife’s safety and
wellbeing when at home on her own. A community alert alarm was recommended
following assessment and was installed in the family home. A package of care was
put in place for personal care. The community alarm alert responders respond to
alert alarm activations when Mr A is at work. After a visit to Blantyre LIFE, the
Occupational Therapist also showed Mr A how to use Amazon Alexa Show’s video
call “drop in” function to allow him to contact his wife and to remind her to take her
medication. After 8 weeks the care package was removed. Mr A purchased smart
watches for both him and Mrs A after a discussion with the Occupational Therapist.
They track their steps by moving more, monitor their heart rates and both set
medication reminders. Mrs A advised the introduction of technology has made her
feel safe and gave her great peace of mind. Mr A expressed the positive impact
technology has made to their lives, and the support it provided him in caring for his
wife. Mr A noted that it now helps them both in self-managing their own health and
well-being. 
2.4.13  The establishment of the Commissioning and Quality Assurance Team in April 2022
has supported the Scottish Government’s Coming Home legislation. South
Lanarkshire Council is rated amongst the top-performing local authorities, when
examining on a per-capita basis, in relation to the Coming Home register, a central
register for service users with Community Care needs who require accommodation
outside their family home. Our aim is to ensure the best value for the partnership while
meeting the needs of the service users. For instance, service users who no longer
need specialist placements are having their needs reviewed and, where fitting, they
are relocated to more suitable accommodation. If appropriate, they are sharing
accommodation and, consequently, care provision, to meet their needs and outcomes.
The team has successfully reviewed cases associated with expired block funding
contract arrangements, saving in excess of £3million.    
2.5 Performance and Support Services
2.5.1 A range of Performance and Support teams work with operational services across
Social Work Resources and embrace a range of business support functions and links
with: IT; Procurement; Finance and Personnel; Carers; Equalities; Workforce Planning;
Corporate Governance; Information Governance; and Asset Management. 
2.5.2 Administration services assist operational staff in the delivery of Social Work services
by providing effective administration and communication support across all service
areas. Administration staff are located in a range of settings across the council area
including council headquarters, four local offices, court units, residential and day care
settings. 
2.5.3 Planning and Development Officers provide a range of support to operational services
with regard to self-evaluation, inspection, regulation, risk management, partnership,
customer feedback, engagement, and information governance. 
380

Page 381

23 
2.5.4 During recent years, meeting statutory timescales set out within the UK General Data
Protection Regulation/Data Protection Act 2018 has been increasingly difficult, with
requests to access personal data increasing by 86% from 116 in 2019/20 to 216 in
2023/24. It is recognised this increase is due in part due to the Redress for Survivors
(Historical Abuse in Care) (Scotland) Act 2021. 
2.5.5 Whilst short term additional resources have enabled the resource to maintain
consistent levels of compliance, a longer term solution was identified to improve overall
performance.  Realignment of operational funding has created resources within the
Planning and Performance team for the appointment of two Information Governance
Assistants whose main task will be to action subject access requests.   
2.5.6 Performance Officers support services with performance reporting; Scottish
Government returns and statutory performance indicators; local government
benchmarking; information to support planning, including demographic profiles and
trends; management information requests as required by services and business
needs. 
2.5.7 The Resource is required to produce a range of statutory plans and partnership
strategies in consultation with key planning partners, including service users and
carers. The Resource also contributes to council corporate planning and reporting
activities. These plans guide the planning of service provision across the Resource
and commit partners to action. They are reviewed regularly to assess progress towards
agreed objectives. Some of the key social work plans include: 
• Community Plan
• Council Plan
• Community Justice 
• Resource Plan
• Advocacy Plan
• Carers Strategy
• Children’s Service Planning
• Workforce Plan
• Strategic Commissioning Plan / Locality Implementation
• Mental Health and Wellbeing Strategy
• See Hear Strategy
• Dementia Strategy 
2.6  Performance monitoring 
2.6.1  Social Work Resources utilise a quarterly performance and monitoring system which
allows services within the Resource to assess performance against key council and
Social Work Resource objectives. Performance information is then used to inform the
annual plan, highlighting areas of progress and approaches to continuous
improvement. The Social Work Resource Plan 2024-2025 also identifies those areas
of action where performance requires to be measured for example, ASP, Adults with
Incapacity (AWI), Child Protection (CP). 
381

Page 382

24 
2.6.2  Quarterly performance management meetings take place in-line with the reporting
timescales of the quarterly report. Examples of performance activity, which are
discussed include findings from case file audit activity, self-evaluation, Social Work
risks and financial performance. 
2.6.3 The performance scorecard within the Resource Plan has a number of measures which
relate to the Council Plan. These are formally reported to the Council’s Executive
Committee twice a year. Any measures which have amber, or red progress status are
discussed within the Council’s Performance and Review Scrutiny Forum and the
CSWO or a Head of Service from the Social Work Resources Management Team is
required to attend and explain the performance and potential improvement activity. 
2.6.4 The performance management system (IMPROVe) supports frontline managers with
real time management information. This system allows managers to look at detailed
caseload or timescale information for aspects of service such as guardianship visits
and reviews and the supervision of children under statutory requirements. In addition,
the system allows the higher-level performance measures within the Resource Plan to
be tracked and measured daily. This enhances performance management capacity and
knowledge across the service, allowing for corrective action to be taken instantly. 
2.6.5  Key performance trend data is recorded at Appendix 1 that supports some examples
of the areas of work identified above. 
2.6.6 The Accounts Commission, as part of their statutory responsibilities, audit public
performance reporting arrangements each year to provide continuity and support
progress of the Local Government Benchmarking Framework (LGBF). Social Work
Resources reports a range of information to demonstrate that it is securing Best Value
in providing services. 
2.6.7 The Care Inspectorate continues to regulate and inspect our registered inhouse care
services which include: care homes for older people; day services for older people; day
services for adults; care and support service for adults; intermediate care service;
children’s houses; child and family services (fostering, adoption and supported carers);
and care at home services. While there are forty-one registered in-house services,
some of these services are delivered from alternative sites. Attached in Appendix 2 are
the most up to date grades in respect of our registered services. 
2.6.8 Analysis and management of information relating to guardianship orders; complex
balance of need; risk and civil liberties in accordance with professional standards, for
example in relation to ASP and CP guidelines; and decisions relating to the need to
place children in secure accommodation and the review of such placements all fall to
the CSWO. 
382

Page 383

25 
Section 3: Challenges and improvements 
3.1  Key Challenges to Service Delivery 
3.1.1 The situation within South Lanarkshire remains similar to that of all public services
across Scotland. Social Work continues to experience the effects of the cost-of-living
crisis; an increase in the number of people living longer into older age with greater
levels of frailty and multiple long-term conditions; and financial pressures across all
areas of budget. This level of volatility, uncertainty, complexity and ambiguity (VUCA)
means that successfully planning and delivering sustainable change becomes even
more critical to ensure that we continue to support the most vulnerable people in South
Lanarkshire. 
3.1.2 There are demographic factors which present specific challenges to Social Work
Resources including: 
• A projected increase in the South Lanarkshire population from 322,472 in 2023 to
327,049 in 2033, which is around a 1.42% increase from the current population.
This projects an increase in demand, further challenged by limited recruitment
opportunities across social care.
• An increasing ageing population (this is most pronounced in the 75+ age group).
As people advance in age their need for health and social care services increases.
• The average weekly package of care increased by 9% from 12.3 hours per user
per week in 2018/19 to 13.4 hours per user per week in 2023/2024. 
• Aligned to this is that the healthy life expectancy for people in South Lanarkshire is
lower than the Scottish average and people will spend a higher proportion of their
lives in poor health.
• South Lanarkshire has a higher percentage of children with a concern at the
27–30 month health visitor review compared to Scotland.
• Adult support and protection inquiries increased by 96% from 1,973 in 2018/19 to
3,859 in 2023/24. 
• The rate of people with 3+ Long Term Conditions (LTCs) is projected to increase
steadily between 2022 and 2025 across most age groups 18+, again increasing
the demand for services.
• South Lanarkshire is more deprived than Scotland as a whole, the publication of
the latest Scottish Index of Multiple Deprivation (SIMD) statistics highlights
persistent levels of deprivation within a number of South Lanarkshire communities.
• Many factors combine to affect the health and wellbeing of individuals and
communities. Whether people are healthy or not is determined by their social and
economic circumstances and the wider environment, all of which contribute to
health inequalities. 
• Exponential and unprecedented pressure on the capacity of health and social care
workforce nationally, with increasing challenges to recruit new staff and retain the
current workforce impacting on the delivery of critical care.    
3.1.3  Increased demand continues to place considerable pressure on existing services.
There has been a significant increase in statutory work between 2018-2019 and 2023-
2024 with: 
383

Page 384

26 
• CP investigations increased by 32% from 539 to 712 (Child Protection data is
recorded from July to August).
• Community Payback Orders (CPOs) imposed increased by 16% from 985 to 1,142.
• Justice Social Work reports increased by 20% from 1,395 to 1,672.
• Adult Support and Protection (ASP) inquiries increased by 96% from 1,968 to
3,859. 
3.1.4 The Resource has taken steps to reinforce capacity across all social work services to
ensure it meets statutory requirements, increased demand and changes in complexity
of service users. Proposed changes to the staffing establishment were approved by
Social Work Resources Committee on 28 June 2023 and 6 March 2024 to ensure
assessment and care management, public protection and mental health workloads
could be met. This demonstrates a commitment to recruitment and retention of the
workforce and enhances career pathways and succession planning for existing staff. 
384

Page 385

27 
Section 4: Resources 
4.1 Financial, budgetary and resource challenges
4.1.1 Over the last year our governance processes have had to contend with the following
key issues and areas of work: 
• Implementation of council wide mitigation factors to minimise risks resulting from
local and national funding and budgetary pressures that impact on the delivery and
maintenance of front-line services.
• Developing flexible approaches for the recruitment and retention of staff to ensure
there is adequate capacity and skills to provide and meet increased service
demands.
• Affordability of services and the requirement to support service users and
employees affected by legacy financial pressures from the global pandemic and
increased cost of living. 
4.1.2 The CSWO has responsibility to identify all major risks for Social Work. The service
risks identified for the Resource are reviewed and monitored on a regular basis with
progress updates reported at every meeting of the Social Work Resources Committee.
In the coming year Social Work Resources will continue to take forward all necessary
actions, where appropriate, to mitigate or reduce the Resource’s exposure to these
risks, in line with tolerance levels defined within the Council’s Corporate Risk
Management Strategy. Service Risk Registers are under development to ensure that
all areas of risk are captured and to identify whether there is a cumulative risk across
services areas. By identifying this, the cumulative risk will be highlighted for attention
within the Social Work Resources Risk Register. 
4.1.3 The Risk Register for the IJB is also reviewed regularly and is presented at every
meeting of the IJB Performance and Audit Sub Committee as some of the top Social
Work risks are reflected in the IJB risk report and may affect the ability to deliver the
directions within the Strategic Commissioning Plan. The Internal Audit Annual
Assurance Report 2023-2024, which relates to all national outcomes as effective
governance arrangements will ensure the IJB can fulfil its statutory duties, stated: 
• Overall, reasonable assurance can be placed on the adequacy and effectiveness
of the partnership’s framework of governance, risk management and control
arrangements for the year ending 31 March 2024. 
4.1.4 Service managers provide strategic and operational oversight of all risks, and the
Senior Management Team (SMT) has identified five top risks that impact on the
delivery of social work services. Whilst these top risks are the current primary focus of
the Resource, there are other risks that continue to be monitored and contributed to by
way of mitigation. On 26 July 2024, the five top Social Work risks were: 
1. Funding and Budgetary Pressures 
2. Workforce Availability and Capacity 
3. Market and Provider Capacity 
385

Page 386

28 
4. Delivery of Strategic Commissioning Plan Outcomes 
5. Households most impacted by the cost-of-living crisis 
4.1.5 To achieve stability over future years, decisions will be taken that will have a direct
impact on the services that we deliver. All options carry consequences which need to
be balanced against the risks to financial sustainability and the council’s ability to
deliver its statutory duties. In order to protect statutory services and address the budget
pressures there is a requirement to review how social work services will be delivered,
and the council needs to determine its risk appetite for significant change in line with
the current financial challenges. 
4.1.6 A report presented to Social Work Committee on 6 March 2024 set out proposals to
address a projected £10.6m cost pressure for Social Work Children and Families
Services for 2024-2025 and beyond, with actions to ensure best value including: 
• Implementation of a Sustainability and Value Option Appraisal Screening Scale to
support option development and decision-making to protect the provision of
statutory duties that support the most vulnerable 
• Commissioning of a new Intensive Family Support Service to reduce numbers of
children currently in high-cost residential placements and reduce the reliance on
future residential placements 
• Review of policies, procedures, services, contracts and use of estate to ensure that
they are up to date in respect of meeting statutory requirements and changes in
legislation, and to benchmark procedures with other areas of Scotland 
4.1.7 In order to secure recurring financial sustainability to maintain a balanced budget in
the delivery of services to adults, the IJB approved the adoption of a Sustainability and
Value Programme in September 2023.   A range of consultation workshops were
undertaken, starting in August 2023, with IJB members, IJB Voting Members and the
South Lanarkshire Health and Social Care Forum, to consider, inform, scrutinise and
challenge potential proposals presented in draft. 
4.1.8 A proposal to re-provision care that was provided from Dewar House and McClymont
House Residential Care Homes formed part of the proposals. This recognised the
reduction in demand for residential care home beds with people supported to stay at
home for longer.  There are 6% fewer registered care home services in 2022 than in
2018 (Source: Care Inspectorate).  A period of consultation followed between
November 2023 and February 2024 and involved those likely to be affected by the
proposal, including families, some residents and staff.  An Independent Advisory Panel
was convened to provide oversight of the process and a full consultation report was
published on the South Lanarkshire University HSCP website. Whilst giving due regard
to the outcome of the consultation, the IJB approved the proposal on 26 March 2024,
to re-provision care away from both Dewar House and McClymont House Residential
Care Homes, with both homes subsequently closing. 
4.1.9 The challenges faced by the council in the recruitment and retention of Social Workers
and their Team Leaders in a very competitive labour force market were highlighted in
2023, with service model improvements made in relation to:
386

Page 387

29 
• Staff and management ratios 
• The gap management posts in some areas of the structure 
• The matrix management of the Social Worker Senior Practitioner role 
• The impact of the current structure on service demand and delivery 
• Staff and caseload ratios 
4.1.10 A Three Horizons Redesign Proposal was submitted to:
• Extend the current role of Operations Manager within locality structures,
incorporating both operational service management with a strategic and
governance role 
• Establish Planning and Performance roles in each of the localities to support these
new management arrangements and the management of data, which is used to
monitor, prioritise, report on and plan locality social work services and allocation of
resources
• Remodel line management arrangements
• Increase capacity within the service with Operations Managers assuming wider
public protection responsibilities in chairing Adult Protection Child Protection and
high risk Multi Agency Public Protection Arrangements (MAPPA) 
4.1.11 Future work to develop Horizon Levels 2 and 3, would comprise of a redesign existing
resources and other services that currently sit alongside locality services e.g. CAReS. 
4.2  Finance 
4.2.1 Social Work Resources had a net revenue budget of £219.616 million for 2023-2024
which was allocated as follows: 
Service Budget amount in
millions of
pounds
% of the
total budget
Performance and Support Services 7.068 3.2
Adult and Older People 169.314 77.1
Children and Families 37.742 17.2
Justice and Substance Misuse 5.492 2.5
Total 219.616 100 
387

Page 388

30 
Section 5: Workforce 
5.1  Workforce 
5.1.1 The social care workforce is one of the largest employment groups in South
Lanarkshire with employees working to provide a range of support within our
communities. Excellent social services require a confident, dedicated, and skilled
workforce which is valued by employers, service users and the public. 
5.1.2 All Social Work staff working with service users are bound by a professional Code of
Conduct which is governed by the Scottish Social Services Council (SSSC). South
Lanarkshire’s Council’s Code of Conduct for Social Work staff has drawn on this
framework; all staff, regardless of qualification agree to adhere to specific professional
codes that guide their practice. 
5.1.3 Everyone in the workforce needs to feel valued and to be motivated to improve their
contribution and be innovative in their practice. Workers must have the right skills,
knowledge, values, and behaviours to provide high quality services. The Council’s
Performance Appraisal Framework supports the discussions with managers and
employees to consider performance, improvement and career planning. Continuous
Professional Development (CPD) is expected from all employees who are required to
keep up to date with developments in their profession. Retaining experienced staff in
front line practice is crucial to delivering excellent social care services. 
5.1.4 Several initiatives are available through the Employee Assistance Programme (EAP),
which offers practical and emotional support for all council employees, including early
intervention, counselling, and financial support. Further initiatives developed include
supporting the mental health and wellbeing of staff with useful information and contacts
shared through the mental health information hub, and an addictions policy that
recognises addiction problems as health issues which should be treated in the same
way as any other illness. Employees are provided with confidential and voluntary
counselling and support services through the PAM Assist Wellbeing App which offers
24/7 employee support. 
5.1.5 South Lanarkshire Council has been recognised as a Carer Positive Employer at the
Engaged Level. The carer positive award is presented to employers in Scotland who
have a working environment where carers are valued and supported. 
5.1.6 Social Work Resources has 2,920 employees as of February 2024. Employees are
supported to deliver their duties through a range of policies including personal
appraisal and a robust training framework. The number of employees (per headcount)
by service is as follows: 
Service Number of employees
Adult and Older Peoples Services 2,133
Children and Justice Services 549
Performance and Support 238
388

Page 389

31 
Service Number of employees
Total 2,920 
5.1.7  Ethical awareness, professional integrity, respect for human rights and a commitment
to promoting social justice are at the core of social service practice. The life changing
and challenging work undertaken cannot be underestimated. This essential work is
underpinned by core values. These values focus on understanding each individual in
the context of family and community, supporting participation, and building on the
strengths of the individual and their communities to promote enablement. 
5.1.8 Assessment of risk is undertaken to protect those staff who continue to work on site
and for those working agile at home or within another location. Well established trade
union and employee forums are in place that enable regular monitoring and resolution
of issues. 
5.1.9 Social Work Resources play a leading role in mainstreaming equalities across a
number of partnership agendas including Integration of Health and Social Care, Public
Protection arrangements, Getting it Right For Every Child, The Promise Board,
Community Planning, Carers Strategy, Lanarkshire Advocacy, and the Community
Justice Partnership. Tackling inequality is a central theme within all these partnership
agendas. Progress against the council’s equality outcomes is reported annually within
the Mainstreaming Equalities Progress Report. 
5.1.10 Social Work Resources participates in the council’s Equality and Diversity Working
Group, and along with other Resources has developed equality outcomes that will meet
the general duty as set out in the Equality Act 2010: 
• To eliminate discrimination
• Advance equality of opportunity
• Foster good relations in all the work we do 
5.1.11 We collect, monitor, and publish information about the diversity of our employees. This
helps us check that we are supporting a culture of diversity and inclusion and identify
areas for continuous improvement. We aim to ensure that our workforce reflects our
community. 
5.1.12 Equality and diversity training is available to all South Lanarkshire Council employees
and Elected Members. All employees are required to undertake on-line mandatory
equalities training, including modules relating to recruitment, unconscious bias,
diversity and race equality awareness. 
5.1.13 An Equality Employee Network supports employees to share their needs and enable
others to understand them. Employees are encouraged to take part in regular forums,
based around the protected characteristics, and this is intended to be supportive, and
a forum for sharing good practice and raising concerns confidentially. The Network has
four strands, Ethnicity Matters; Disability Matters; LGBT (Lesbian, Gay, Bisexual, and
Transgender) Matters; and Caring Matters.
389

Page 390

32 
5.1.14 Whilst menopause is not a specific characteristic under the Equality Act 2010, if an
employee is put at a disadvantage and treated less favourably because of their
menopause symptoms, this could be discrimination if related to, for example, age,
disability, gender reassignment, sex. The Menopause Policy aims to support
individuals to feel confident about raising and discussing issues with their manager
about their symptoms, and to ask for assistance and/or adjustments at work. 
5.2  Workforce Planning 
5.2.1  The CSWO has a key planning and leadership role in relation to workforce planning
and development, both from a local authority and partnership perspective. Whilst social
care services are a diverse sector in terms of job roles, career pathways and service
structures, what unifies the sector is a common set of shared values and ethics which
underpins the principles of those that work in the sector. 
5.2.2 A significant number of staff are projected to reach retirement age over the next ten
years and this together with high turnover of staff and an ongoing requirement to retain
and increase numbers of qualified workers presents a particular challenge. The Social
Work Workforce Plan 2022-2025 aims to mitigate the risks of a diminishing workforce
against areas of growing demand. 
5.2.3 The Plan highlights key challenges, including: 
• Sustained pressure on services and an increased demand that will continue over
the period of the plan. 
• Significant national workforce supply challenges that require action at a national
policy level to impact change 
• Implications of the National Care Service and impact on existing workforce and
ability to recruit 
• Maintaining the well-being and value of the workforce to enable recruitment and
retention across all service areas 
5.2.4 An action plan to address these challenges focuses on the need to: 
• Maximise available resources.
• Explore options for service redesign and review current recruitment practices,
including the establishment of a Care Academy to ‘grow our own’ workforce.
• Enhance career pathways and succession planning
• Ensure the workforce feel valued and supported 
It is however acknowledged that not all risks can be eliminated whilst a national health
and social care workforce crisis remains. 
5.2.5 The Lanarkshire Care Academy aims to better promote Social Care as a vocation in
South Lanarkshire; reinforce and expand routes into a career in Social Care; and
provide a much more explicit framework to enable the council to ‘grow their own’
workforce to address workforce requirements. A Care Academy has been developed
390

Page 391

33 
on a Lanarkshire-wide basis building upon existing effective co-operation between
both South Lanarkshire and North Lanarkshire HSCPs; joint working between the
councils and NHS Lanarkshire; and Lanarkshire-wide services “hosted” by each
HSCP. Partners will work together to share learning and enable a more structured
approach to address recruitment challenges and enhance capacity to meet increasing
demands for services. 
5.2.6  The council already has a range of initiatives which fit into and enhance the
Lanarkshire Care Academy, including the well-established Modern Apprenticeship
Programme; the council’s Youth Employability Service and Foundation Apprenticeship
programme; The GradU8 Programme; and professional apprentices. The Care
Academy will support the commitment to Keep the Promise for care experienced
children, young people and their families, promoting opportunities for routes into a
career in Social Care and providing bespoke employability support to all care
experienced young people who need it, whilst expanding the care experienced pilot
Into Work program. 
391

Page 392

34 
Section 6:  Training, Learning and Development 
6.1 Learning and Development
6.1.1 The CSWO is a member of Social Work Scotland (SWS), the professional leadership
body for the Social Work and Social Care professions. The membership organisation
represents Social Workers and other professionals who lead and support Social Work
across all sectors. It will influence and advise on the development of policy and
legislation and support the development of the Social Work and Social Care
professions. 
6.1.2 The CSWO is active in overseeing the quality of services and is responsible for
ensuring that Social Work staff are appropriately trained and supported to carry out
their professional and statutory duties. This is undertaken in a number of ways
including regular meetings between the CSWO and senior managers to discuss
performance and other operational issues, fulfilling corporate governance
requirements through the annual Internal Statement of Assurance and overall
Governance Assessment Framework with the agreement of the Chair of the Social
Work Resources Committee. 
6.1.3 The CSWO actively promotes continuous improvement and evidence-informed
practice, including the development of person-centred services that are focussed on
the needs of the service-user. The CSWO also oversees the quality of practice learning
experiences for Social Work students and effective workplace assessment
arrangements in accordance with the SSSC Code of Practice. South Lanarkshire is a
member of Learning Network West and cohorts of students are provided with
placements annually across the Social Work Service. Each placement is supported by
a Practice Teacher identified from the South Lanarkshire Social Work workforce. 
6.1.4 The CSWO has a role in ensuring Learning Reviews take place as required. The
outcome of Learning Reviews is published on South Lanarkshire Council’s Adult
Protection Committee and Child Protection Committee websites. Learning is crucial for
staff across the Resource, with actions agreed and taken forward as a partnership as
a result of reports published. 
6.1.5 Staff continue to be supported to complete the Professional Development Award in
Practice Learning (PDAPL). Currently, 2 employees are due to complete and graduate
in 2024. Funding has been made available to support one employee undertake the
qualification in 2024-2026. In 2023-2024 Adult Residential Services provided practice
learning opportunities to undergraduate nursing students. Higher National Certificate
(HNC) placements continue to be offered. 
6.1.6 The Mental Health Officer Award is funded on an ongoing basis to enable the council
to meet legislative obligations under the Adults with Incapacity (Scotland) Act (2000)
and the Mental Health (Care and Treatment) (Scotland) Act (2003). A Staff
Development Officer for Mental Health Services who is a trained Mental Health Officer
provides support to meet the learning and development requirements within this
service.
392

Page 393

35 
6.1.7 The South Lanarkshire University HSCP Learning and Workforce Development Group
has a strategic overview of the learning and development activity that takes place
across health and social care and ensures there is openness and transparency in
relation to how training is organised and accessed by staff. The development of a
Social Work Resource Learning and Development Plan is instrumental to this and
contributes to supporting a learning culture. 
6.1.8 Each Social Work service area has a learning and development pathway, which
highlights the specific learning and development needs for individual staff; and, in
addition to the pathways, there are service priorities for all staff within Social Work.
These highlight any newly required or ongoing training needs and are presented at the
Learning and Development Workforce Planning Boards. This includes inhouse training
(virtual, e-learning and only, if necessary, classroom learning) and any externally
purchased courses. 
6.1.9  Learning and development requirements of individual staff members are identified
through supervision and reflected in an Annual Performance Appraisal meeting.
Additional training requirements are identified through the Corporate Learning and
Development Team for Social Work Resources. 
6.1.10 Social Work Resources supports evidence informed practice and in developing its re-
search culture funds post-graduate courses to support staff with their learning and de-
velopment. On an annual basis an agreed number of staff are supported to undertake
Post Graduate Certificate qualifications. In 2023 – 2024 these included Adult Support
and Protection (ASP) and Child Welfare and Protection. 
6.1.11 The ongoing development of the Dementia Strategy details the level of input/training
required for each sector of the workforce from ‘Informed’ through to ‘Expert.’ The
programme continues to incorporate new members of staff and includes colleagues
from other council resources and NHS. 
6.1.12  Access to Management and Leadership Development training is available through
Personnel services to all Social Work staff, in consultation with their line managers.
Those who are either first time managers or who are looking to be promoted to a
management post can also participate in the Management Induction and Development
Programme delivered by the Social Work Learning and Development Team. This
programme is specifically designed for social work staff. Staff wishing to develop their
leadership skills are also encouraged to make use of SSSC Step into Leadership
learning resources. 
6.1.13 Registration within timescale for all staff within Social Work Resources is set out by the
SSSC. Where staff have conditional registrations or where the achievement of
appropriate qualifications is required, support is provided. 
6.1.14 All newly qualified Social Workers meet with the relevant Staff Development Officer for
a learning and development/Continuous Professional Learning (CPL) induction
meeting to draw attention to the relevant learning and development pathway for their
393

Page 394

36 
post, how to access training and ensure they understand their responsibilities in
relation to post registration training and learning requirements. The support that is
available in relation to the CPL is also explained. 
6.1.15 The Adult and Older People’s service is committed to ensuring newly qualified social
workers are supported, in particular, within their first year. Mentors are assigned as
well as slowly building caseloads over the first year. Supervision occurs on more
regular basis with the model of supervision encouraging a culture of continuous
learning. Group supervision has been established with a focus on specific areas of
development determined by the newly qualified social workers. This helps to develop
peer support.  
6.1.16 Mentoring arrangements also support newly qualified MHOs (Mental Health Officer),
and a Mental Health Officer Forum is held quarterly to facilitate learning and discussion
regarding MHO practice, developments in legislation and the work of the Mental
Welfare Commission. Training opportunities are promoted throughout the mental
health service. 
6.1.17 Within Children and Family teams newly qualified social workers are supported
throughout their first year of practice. This includes individual and group support as
well as a caseload that is built up incrementally over several months. Furthermore, all
Social Workers attend Practice Development Sessions which are regularly scheduled
throughout the year. This provides Social Workers with the space to learn and reflect
on practice. 
6.1.18  The Justice Learning & Development Liaison Group completed a training needs
analysis and identified the following areas of priority: 
• Through the Pan Lanarkshire MAPPA training subgroup, a dedicated MAPPA Risk
Management training session available to all social work staff, was delivered by
Professor Hazel Kemshall in September 2023. A further session was delivered by
Justice Services to frontline staff following a MAPPA learning review to support
staff in developing their skill base in risk management strategy work and
consideration of neurodivergent and learning disability needs. Risk Management
Planning training.
• Restorative Justice – Justice services are committed to ensuring all Whole
Systems Approach staff are trained within this area of practice. The service
provided Restorative Justice and Practice skills training from University of
Strathclyde in September 2023. Since then, a working group has been established
to look at a proposed change plan alongside Children and Young People’s Centre
and Community Justice Scotland to support the implementation of Restorative
Justice approaches within Justice Social Work
• Harmful Sexual Behaviour 16–21-year-olds – Justice Social Work continues to
contribute towards the re-development of the Care and Risk Management (CARM)
processes. within the council. Harmful Sexual Behaviour 16–21-year-olds Whole
System Approach (WSA) have completed the Lucy Faithful Foundation's INFORM
Programme training and delivered this programme in relation to internet related
sexual harm. Staff have also been attending relevant training relating to contextual
394

Page 395

37 
safeguarding and the CYCJ inputs with a member of staff at WSA are now AIM 3
trained also.    
395

Page 396

38 
Section 7: Looking Ahead 
7.1 Horizon scanning
7.1.1 The following areas of activity, which are likely to impact the Resource in the future
include: 
• Local government in Scotland: Overview 2023 (audit.scot) 
Continuing financial challenges with expenditure exceeding allocated budgets.
Audit Scotland report published 17 May 2023 
• Integration Joint Boards: Financial analysis 2021/22 | Audit Scotland 
IJB statutory duties set out in the Public Bodies (Joint Working) (Scotland) Act 2014
and other associated legislative duties to maintain a balanced budget. Audit
Scotland report published 6 April 2023 
• The Scottish Government's workforce challenges
Workforce availability and capacity challenged by competitive labour markets
influencing the ability to recruit and retain staff across the social care sector. Audit
Scotland report published 
• Legislation:
o Children (Care and Justice) (Scotland) Bill – Stage 3
o National Care Service (Scotland) Bill – Stage 2
o Victims, Witnesses, and Justice Reform (Scotland) Bill – Stage 2 
7.1.2 Funding and budgetary pressures remain challenging as a result of additional demand
and increased costs of delivering services. Implementation of the Sustainability and
Value Programme across social work services will require ongoing consultation with
members of the public, families, carers, and employees as service changes are taking
place. 
7.1.3 Community engagement and consultation continues to have an effective and direct
impact on shaping service priorities for the future. A consultation programme for the
new strategic plan will take place during 2024-2025. 
7.1.4 Social Work Resources will respond to the findings of the Independent Review of
Inspection, Scrutiny and Regulation (IRISR) which are currently under consideration.
The report outlines 38 recommendations that reflect cultural and legislative changes to
the existing arrangements, including greater involvement of people with lived
experience and a review of existing powers of intervention and enforcement, Health
and Social Care Standards, and legislation relating to fitness of providers. 
7.1.5 The council will continue to contribute to the ongoing debates in relation to The National
Care Services (Scotland) Bill. Stage 1 debate of the bill was extended and concluded
on 31 January 2024, allowing further consultation with stakeholders. Meanwhile,
agreement has been reached to share accountability for the care system between
Scottish Ministers, local authorities and NHS boards; staff will continue to be employed
by councils rather than transferring to new care boards and councils will also retain
responsibility for buildings and the delivery of social care and social work services. 
396

Page 397

39 
7.1.6 The replacement Social Work case management IT System is in progress, with a
robust training programme prepared for all social work employees. It is anticipated that
the new system will be available from early 2025. 
7.1.7 By December 2025 all analogue telephone services in the UK will be switched off and
replaced by digital systems using voice over internet protocol technology.
Telecommunication suppliers are transitioning their customers to digital which includes
the South Lanarkshire community alarm service users. The TEC team will finalise the
council’s analogue 2 digital replacement programme, with 6580 digital alert alarms
installed as of 31 March 2024. 
7.1.8 Care at Home services will implement the new 10-year contract with Care at Home
providers from 1 July 2024. 
7.1.9  The Resource along with partners in North Lanarkshire Council, Police and NHS
Lanarkshire have applied for The Bairns’ Hoose Thematic Fund. If successful, the
funding would be used to:
• Recruit a project manager to lead the project and co-ordinate and lead on scoping
of local supports and services and consultation with children, their families, and
communities.
• Undertake induction of project manager, including networking across the
partnership.
• Back fill staff member post to manage gap in existing service.
• Fully develop project brief and plan with the project manager and oversight group
to identify specific timelines for scoping, consultation and access to existing data
and local information. 
• Awareness raising of Bairns Hoose model and local project plan across the
partnership. 
7.1.10 As with all of the Bairns’ Hoose funding, grantholders must commit to: 
• Meaningfully involve children and young people, with lived experience of child
protection and justice processes, in the design and delivery of the Bairns’ Hoose
test of change approach. 
• Work to develop trauma responsive approaches across the Bairns’ Hoose partner
organisations, systems and workforces in line with the Roadmap for Creating
Trauma-Informed and Responsive Change | NHS (scot.nhs.uk) 
7.1.11  Paths Away from Poverty is funded by the Scottish Government’s Child Poverty
Accelerator Fund and is supporting families where there is a child or a young person
in the household with a disability. While this project is in the early stages of
development (it will run until March 2025 working with at least ten families) it is
beginning to identify potentially more effective ways to engage and support families to
deal with financial, wellbeing and inclusion challenges. Support is delivered primarily
through a key worker relationship, with workers for the project being provided by the
third sector organization, COVEY.
397

Page 398

40 
7.1.12 Justice Social Work continues to embed those with lived experience within their
services. This has been demonstrated through the permanency of the existing two
locality peer mentor posts. This has been further consolidated through a further post
being created within our Whole Systems Approach team for 16–21-year-old service
users. Work is underway to expand this approach further based on the findings from
Iconic Consultancy independent evaluation. This demonstrated the impact and support
staff in these roles made to service users and supported positive cultures within teams. 
398

Page 399

41 
Appendix 1 Performance Data and Trends 
Year  Number of Adult Support and Protection Inquiries 
2019 - 2020  2,862
2020 - 2021  2,948
2021 - 2022  2,849
2022 - 2023  3,449
2023 - 2024 3,859 
Source: ASP Scottish Government Return 
399

Page 400

42 
Year  Number of Adult Support and Protection In-
vestigations 
2019 - 2020  1,300
2020 - 2021  1,144
2021 - 2022  1,273
2022 – 2023  1,533
2023 - 2024 1,546
Source: ASP Scottish Government Return 
400

Page 401

43 
Year 
Percentage of Statutory
Supervising Officer Visits
held within timescales for
Welfare Guardianship or-
ders – Local Authority (%) 
Percentage of Statutory
Supervising Officer Vis-
its held within time-
scales for Welfare
Guardianship orders –
Private (%) 
2019 - 2020  93 86
2020 - 2021  94 94
2021 - 2022  94 95
2022 - 2023  93 93
2023 - 2024 94 92
Source: Social Work Resource Plan, IMPROVe 
401

Page 402

44 
Year  Number of Child Protection Investigations
Completed 
2018 - 2019 539
2019 - 2020  699
2020 - 2021  780
2021 - 2022  692
2022 – 2023  725
Source: CP Scottish Government Return (Academic years: August to July) 
402

Page 403

45 
Year 
Percentage of reports submitted to Scot-
tish Children’s Reporter within timescales
(%) 
2019 - 2020  71
2020 - 2021  88
2021 - 2022  82
2022 – 2023  77
2023 - 2024 58
Source: Social Work Resource Plan, IMPROVe 
403

Page 404

46 
Year 
Percentage of children seen within 15
days following Compulsory Supervision
Order commencing (%) 
2019 - 2020  90
2020 - 2021  70
2021 - 2022  94
2022 – 2023  89
2023 - 2024 53
Source: Social Work Resource Plan, IMPROVe 
404

Page 405

47 
Year  Percentage of people on CPO unpaid work re-
quirements seen within 5 working days (%) 
2019 - 2020  77
2020 - 2021  59
2021 - 2022  68
2022 – 2023  69
2023 - 2024 72
Source: Social Work Resource Plan, IMPROVe 
Year  Percentage of people starting their unpaid work
within 7 days of CPO (%) 
2019 - 2020  77
2020 - 2021  48
2021 - 2022  65
2022 – 2023  67
2023 - 2024 70
Source: Social Work Resource Plan, IMPROVe
405

Page 406

48 
Appendix 2: Care Inspectorate Gradings for Registered Services as of 30th June 2024 
Service Latest Inspection How well do
we support
people's well-
being?
How well is
our care and
support
planned?
How good is
our setting?
How good
is our staff
team?
How good is
our leader-
ship?
Child and Family Services
1 South Lanarkshire Council - Adoption Service 27/03/2023 4 5 Not Assessed 5 5
2 Supported Carers Service 22/01/2019 5 5 Not Assessed 5 5
3 South Lanarkshire Council - Fostering Service 27/03/2023 5 5 Not Assessed 5 4
Children’s  ouses
4 Langlea Avenue 19/04/2022 5 5 5 5 5
5 Bardykes Road 29/07/2022 5 5 5 5 5
6 Rosslyn Avenue 13/05/2022 5 5 5 5 5
7 Hunters Crescent 29/04/2022 4 4 4 4 4
8 Station Road 22/09/2023 4 4 4 4 4
9 Hillhouse 30/06/2022 5 5 5 5 5
Care Homes – Older People
10 Meldrum Gardens 18/01/2024 5 5 5 5 5
11 McKillop Gardens 01/07/2022 5 5 5 5 5
12 McClymont House 31/05/2022 5 5 6 5 5
13 David Walker Gardens 11/11/2022 5 5 5 5 4
14 Dewar House 25/01/2023 5 5 4 5 5
Day Services – Adult and Older People
406

Page 407

49 
15 Lifestyle Lanark, Harry Smith Complex 12/08/2015 6 6 6 6 6
16 South Lanarkshire Lifestyles - Stonehouse 26/05/2017 5 5 5 4 5
17 South Lanarkshire Lifestyles - Fairhill 22/01/2019 5 5 5 5 5
18 Whitehill Day Centre 24/07/2018 5 5 5 5 5
19 Newberry Rooney 22/11/2016 5 5 5 5 4
20 South Lanarkshire Lifestyles - Carluke 19/05/2017 5 5 6 5 5
21 Meldrum House 05/06/2017 5 5 5 5 5
22 Saltire Neighbourhood Centre 22/05/2018 5 5 5 5 5
23 Harry Heaney Centre 10/05/2019 5 5 5 5 5
24 McClymont Resource Centre 05/08/2019 5 5 5 5 5
25 Lesmahagow Neighbourhood Centre 07/02/2017 5 5 6 5 5
26 Canderavon Neighbourhood Centre 16/02/2016 4 4 5 5 5
27 Jimmy Swinburne Resource Centre 15/05/2018 5 5 5 4 5
28 St. Andrew's Day Centre 24/07/2019 5 4 5 5 5
29 South Lanarkshire Lifestyles East Kilbride 13/12/2016 5 5 5 5 5
30 South Lanarkshire Lifestyles Eastfield 15/11/2017 5 5 5 5 4
31 Nisbet Centre 18/06/2019 5 5 5 5 5
32 Parkhall House 03/08/2018 5 5 5 5 4
33 Jenny MacLachlan Centre 19/01/2017 6 6 5 5 5
Care at Home Services
34 East Kilbride Home Care Service 24/01/2020 4 4 Not Assessed 5 5
35 Hamilton Home Care Service 17/06/2021 3 3 Not Assessed 3 3
407

Page 408

50 
36 Rutherglen Home Care Service 24/11/2020 4 3 Not Assessed 4 4
37 Clydesdale Homecare 24/05/2024 5 5 Not Assessed 5  5
Home First Services
38 Home First (East Kilbride and Rutherglen) Registered - 2/9/22     
39 Home First (Clydesdale and Hamilton)  Registered - 2/9/22     
Housing Support Services
40 Care and Support Service (North and South) 20/05/2019 4 4 Not Assessed 5 4
Intermediate Care Services
41 Blantyre Life Registered -
15/12/22     
Grades guide: 
1 Unsatisfactory 
2 Weak 
3 Adequate 
4 Good 
5 Very Good 
6 Excellent 
NA – Not Assessed 
408

Page 409

If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. 
Phone: 0303 123 1015 
Email: equalities@southlanarkshire.gov.uk 
409

Page 410

410

Page 411

Agenda Item 
Report 
Report to: Executive Committee
Date of Meeting: 13 November 2024
Report by: Director, Health and Social Care  
Subject: South Lanarkshire Integration Joint Board Annual
Performance Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the South Lanarkshire Integration Joint Board (IJB) Annual Performance
Report 2023/2024 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted. 
3. Background
3.1. Section 42 of the Public Bodies (Joint Working) (Scotland) Act 2014 requires that
Annual Performance Reports (APRs) are prepared by an Integration Authority – i.e.
the Integration Joint Board (IJB) in a South Lanarkshire context.  The 2014 Act
obliges that the APR should cover the preceding year’s activity and be published four
months after the end of that reporting year. 
3.2. The purpose of the APR is to ensure that performance is open and accountable,
whilst at the same time providing an overall assessment of performance in relation to
planning and carrying out integration functions.  The APR is also of interest to the
Health Board and South Lanarkshire Council in monitoring the success of the
integration arrangements they have put in place, as per the Integration Scheme. 
3.3. The Scottish Government issued Guidance for APRs in March 2016, with
recommended areas for inclusion, including:- 
 a summary of progress against the nine National Health outcomes using as a
minimum the 23 core national performance indicators
 financial performance and best value 
3.4. As with previous years, the APR 2023/2024 is aligned to reporting progress against
the intentions outlined in the Strategic Commissioning Plan.  This APR covers the
second year of the 2022 – 2025 Strategic Commissioning Plan. 
18
411

Page 412

3.5. By way of summary, some of the main achievements within 2023/24 are summarised
as below: 
• The Blantyre Life Care Campus, which forms part of the IJB’s intermediate care
strategy provides reablement/rehabilitation support to people aged 50 and over
who are clinically fit for discharge.  The bed based intermediate care service on
the campus is resourced to provide support for up to 42 days for each person but
is operating at an average of 27 days to return people home safely.  90% of
people who have received a service thus far rated the service as very good or
excellent,
• The Home First Care at Home Service which is also part of the intermediate care
strategy, provides home based reablement and rehabilitation to people in South
Lanarkshire.  Work to date shows that when a person successfully completes a
reablement intervention they require 35% less care at home hours for their
ongoing care requirements.  This exceeds the 25% target for the service.
• The Primary Care Out of Hours Services provides critical support to people who
require access to urgent GP services in the out of hours period.  Over an average
week, the service provides 118 hours of support and responds to approximately
80,000 contacts per annum
• The use of technology to support people with their care continues to be a real
success story for the Health and Social Care Partnership.  In a supported
discharge context, 24% of all discharges were supported with an assistive
technology solution as part of the care package 
• Build on and maintain how we support and protect vulnerable adults as
highlighted in the positive inspection report by the Care Inspectorate with regards
to adult support and protection.
• The contribution of the HSCP to Operation Flow as part of stabilising pressures
across the health and social care system.  Initiatives like this will form part of the
response to forthcoming seasonal winter pressures.  
• The successful implementation of the ‘Home First’ approach in supporting the
Discharge without Delay programme.  Moreover, the newly opened ‘Blantyre Life’
facility forms a key part of the options available to support discharge planning and
ultimately, the goal to support people to return home. 
• The expansion of assisted technology in supporting people to remain
independent.  For example, 4,151 telecare items installed across 2022/23, with
the intention to continue to promote this.
• Commissioned arrangements with Lanarkshire Carers continues to grow with
1,398 new carers were identified in 2023/24, which represents an increase of
26% on the previous year. Overall, Lanarkshire Carers are in touch with 6,825
carers.  
4. Employee Implications
4.1. There are no employee implications associated with this report. 
5. Financial Implications 
5.1 There are no financial implications associated with this report.    
412

Page 413

6.  Climate Change, Sustainability and Environmental Implications 
6.1.  There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7.  Other Implications 
7.1.  The APR presents progress in a range of areas that contribute to the mitigation of a
number of risks within the IJB Risk Register, notably: 
• Financial sustainability – very high
• Workforce availability and capacity – very high
• Performance delivery – very high
• Failure to meet public protection and legislative requirements – high
• Failure to fulfil emergency response commitments befitting the IJB’s status as a
Category One (emergency) responder – low 
• Performance Reporting does not capture performance across the whole health
and social care system – medium
• Winter pressures – medium 
7.2.  There are no other issues associated with this report. 
8.  Equality Impact Assessment and Consultation Arrangements 
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
8.2.  The APR relates to the Strategic Commissioning Plan 2022 - 2025, which was
extensively consulted on. 
Soumen Sengupta
Director, Health and Social Care 
25 September 2024 
Previous References
 Strategic Commissioning Plan 2022 - 2025 
List of Background Papers
 Appendix 1 - Annual Performance Report 2023/2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Name: Martin Kane, Service Manager Performance and Support
Ext:     3743
Email: martin.kane@southlanarkshire.gov.uk 
413

Page 414

414

Page 415

South Lanarkshire 
Integration Joint Board
Annual Performance Report
2023/24
SLC print
18
415

Page 416

2023/24Annual Performance Report
2
South Lanarkshire Integration Joint Board
Annual Performance Report 2023/24
Our Vision is
SLC print
416

Page 417

3
Contents
3
1. Foreword  4
2. The role of the Integration Joint Board  5
3. Background and operating context 6
4. Performance against national indicators  7
5. Financial performance 2023/2024 10
6. Strategic overview 12
7. Governance and accountability 13
8. Risk 13
9. Taking a closer look 14
10. Looking to the future 18
SLC print
417

Page 418

2023/24Annual Performance Report
4
1. Foreword
Professor 
Soumen Sengupta
Chief Officer, 
South Lanarkshire 
Integration Joint Board
Margaret Walker
Vice Chair,
South Lanarkshire 
Integration Joint Board
Lesley McDonald
Chair,
South Lanarkshire 
Integration Joint Board
Over the course of this year we have had much
to celebrate as our health and social care
staff have continued to deliver services and
supports that we can be proud of. Alongside
their professionalism and compassion, they
have continued to be collaborative, evaluative
and innovative in developing practice for the
communities that we all serve.
Through the course of this year we have also
had to reckon with the hard realities and
difficult decisions. In its report on Integration
Joint Boards – Finance and Performance
2024, the Audit Commission has highlighted
that all Integration Joint Boards (IJBs) have
and continue to “face a complex landscape
of unprecedented pressures, challenges and
uncertainties”. The Audit Commission also
acknowledges that these pressures, challenges
and uncertainties “are not easy to resolve
and are worsening, despite a driven and
committed workforce” – and has stated that
IJBs have reached the point where significant
transformation will be needed to ensure the
long-term capacity, financial sustainability
and quality of services individuals receive.
For our IJB – for our services, our staff and
our communities – that was reflected in our
being faced with a recurring budget shortfall
of £33million for 2023/24. No one wants to
be in that type of financial position – and it
was certainly not one of our making. The size
of that funding gap though meant that in order
for the IJB to live-within-its-means that it had to
take decisions that inevitably had implications
for how a number of valued services were and
are provided. In facing up to those realities and
taking those difficult decisions, we have remained
absolutely committed to developing realistic,
sustainable and responsible proposals that protect
those most vulnerable and at-risk across our
communities. And while unfortunately we know
that there is more uncertainty ahead – just as
is true for all of our partners and right across
the public sector – we remain steadfast in that
commitment.
We also recognise that continued collaboration
and innovation holds the promise for practical
improvements to how we deliver services
and supports within the resources available
– shaping our practice and delivery based on
using data, evidence and insights. That long-
term commitment to work with other partners
differently was most visibly expressed by the
adoption this year of the newly-named South
Lanarkshire University Health and Social Care
Partnership. By enhancing and extending our
work together we aim to develop sustainable,
innovative and practical solutions to health and
social care challenges that will directly benefit our
communities and our workforce for years to come.
SLC print
418

Page 419

5
• Takes forward the operational implementation of the
plan on behalf of the parties – SLC and NHSL
• Provides assurance to the IJB and the parties on
progress with the implementation of the plan
Health and Social
Care Partnership
(Operational)
• Formal public body
• Develops and leads the strategy for health and 
social care through the Strategic Commissioning Plan
• Issues ‘Direction to South Lanarkshire Council (SLC)
and NHS Lanarkshire (NHSL)
Integration 
Joint Board
(Strategic)
2. The role of the Integration Joint Board
SLC print
419

Page 420

2023/24Annual Performance Report
6
3. Background and operating context
Strategic commissioning is the main process for
understanding, planning and delivering better
health and wellbeing outcomes. Well-planned
strategic commissioning offers the opportunity
to increase the value and financial sustainability
of care by making the most effective use of
available resources and the most efficient and
consistent delivery.
• It is projected that the population within South
Lanarkshire will rise from 322,630 in 2021 to
325,243 in 2028, an increase of 1%. 
• The projected 2028 figures show the largest
decrease of 5% in 0-15 age group and the largest
increase of 20% in the 75+ age group.
• In 2020/2021, it was estimated that 22.7% of the
South Lanarkshire population had at least one
physical long-term condition.
• In South Lanarkshire, 40,695 (12.8%) of people
are income deprived (Scottish average - 12.1%),
with 17,313 (43%) of people living in the 20%
most deprived data zones. 
The IJB’s Strategic Commissioning Plan 2022 –
2025 (SCP) sets out how health and social care
services will be delivered to improve the quality of
support for people in South Lanarkshire. 
A review the SCP provided substantial assurance
on the development and content of the SCP,
noting that:
‘Notwithstanding our very positive assessment of
the SCP and the process through which it was
produced, the environment in which the SLIJB
operates is exceptionally complex and extremely
challenging at present, a fact recognised within
the SCP itself’.
Progress made by the HSCP on the SCP’s key
priorities and key performance indicators are
reported regularly to the IJB and can be accessed
from the HSCP website www.slhscp.org.uk. 
SLC print
420

Page 421

7
Ministerial Strategic Group (MSG) Indicators
MSG Indicator 2019/20 2020/21 2021/22 2022/23 2023/24
Number of emergency
admissions
40,461 32,537 37,028 36,849 37,188
Number of unscheduled hospital
bed days (acute specialties)*
238,434 200,694 242,883 260,297 *253,153
Number of A&E attendances 110,095 83,441 104,080 103,855 106,484
Acute bed days lost to 
delayed discharges
46,570 22,585 35,941 41,970 41,795
% of last six months of life
spent in Community setting
88.2% 90.8% 89.5% 88.8% *88.8%
Balance of care: 
Percentage of 75+ population 
at home unsupported
83.6% 84.7% 84.9% 84.7% Not available
*Calendar year 2023 has been used as a proxy for 2023/24 for this indicator as per guidance from 
Public Health Scotland due to data completeness issues.
The IJB seeks to promote a culture of continuous
improvement to deliver better outcomes for individuals
and communities. Our Performance Management
Framework provides the structure by which the IJB
can make informed decisions on future priorities,
using performance information to identify and drive
improvement work.
A core suite of indicators has been agreed nationally to
ensure consistency across all IJB areas. Nine of these
indicators are survey based or qualitative measures
which are gathered every two years from the national
Health and Social Care experience survey, with the
remaining indicators being regular health and social
care performance measures.
4. Performance against national indicators
A summary of the MSG (Ministerial Steering Group)
indicators in South Lanarkshire for currently available
data showing the year-on-year comparison between
April 2023 and March 2024 is detailed below. 
The IJB has also reflected the recommendation
from the 2022/23 External Audit Annual Report and
added additional measures aligned to the Strategic
Commissioning Plan (SCP) priorities.
These have been introduced in 
performance reports to the Performance 
and Audit Sub Committee and IJB 
since November 2023.
SLC print
421

Page 422

2023/24Annual Performance Report
8
National Indicator 2023/24
Percentage of adults able to look after their health very well or quite well 89.4%
Percentage of adults supported at home who agreed that they are supported to live as
independently as possible
67.2%
Percentage of adults supported at home who agreed that they had a say 
in how their help, care, or support was provided
55.4%
Percentage of adults supported at home who agreed that their health and social care
services seemed to be well co-ordinated
58.2%
Total % of adults receiving any care or support who rated it as 
excellent or good
66.7%
Percentage of people with positive experience of the care provided by 
their GP practice
56.5%
Percentage of adults supported at home who agree that their services and support had an
impact on improving or maintaining their quality of life
63.3%
Total combined % carers who feel supported to continue in their caring role 28.1%
Percentage of adults supported at home who agreed they felt safe 66.2%
*Please note that National Indicators 1-9 are based on the Health and Care Experience (HACE) survey that
has been updated with the results from the 2024 HACE survey. Please note results for indicators 2, 3, 4,
5, 7 and 9 for 2023/24 are not comparable to previous years due to changes in survey wording. Also results
for 2019/20 and 2021/22 for indicators 2, 3, 4, 5, 7 and 9 are comparable to each other, but not directly
comparable to figures in previous years due to changes in survey wording and methodology.
National Indicator 2020/21 2021/22 2022/23 2023/24 Commentary
*Premature 
mortality rate per
100,000 persons
493.4 471.6 459 n/a
*Emergency admission
rate for adults (per 
100,000 population)
11,995 12,839 12,530 12,697 Emergency admission rates have
increased slightly since 2022/23.
*Emergency bed day
rate for adults (per
100,000 population)
98,999 117,362 122,237 118,037 While Emergency Bed Day rates
have decreased for SL residents they
remain above the national average.
*Emergency
readmissions to hospital
within 28 days of
discharge (rate per
1,000 discharges)
112 103 100 97 The rate of emergency readmissions is
below the average level for Scotland,
and the rate for SL residents has
decreased since last year.
SLC print
422

Page 423

9
National Indicator 2020/21 2021/22 2022/23 2023/24 Commentary
*Proportion of last
6 months of life
spent at home or in a
community setting
90.8% 89.4% 88.8% 88.8% Trends in the balance of care from
hospital to community settings
indicates that South Lanarkshire
has consistently achieve 88-90%
performance in this area.
*Falls rate per 1,000
population aged 65+
19.3 22.4 22.7 21.5 The rate of falls per 1,000 population
for those aged 65+ has decreased
since 2022/23 to present.
Proportion of care
services graded
'good' (4) or better
in Care Inspectorate
inspections
80.1% 76.1% 76.9% 79.9% Performance has increased between
last year and this year and remains
above the Scotland level.
*Percentage of adults
with intensive care
needs receiving care at
home
63.4% 64.8% 63.6% 62.9% Trends over the last 4 years report
broad consistency in this area despite
notable increases in demand and
complexity of care being delivered in
the community.
Number of days people
aged 75+ spend in
hospital when they are
ready to be discharged
(per 1,000 population)
544 910 1,044 1008 Demand and complexity continue to
impact on delayed discharges.
Percentage of health
and care resource
spent on hospital stays
where the patient
was admitted in an
emergency**
n/a n/a n/a n/a** **See notes below.
*Indicators 12, 13, 14, 15, 16, and 19 are based 
on patient level hospital activity information called
Scottish Morbidity Records (SMRs) which are submitted
to PHS by NHS Boards. Please note that data may 
not be 100% complete for certain areas for calendar
year 2023.
**Indicator 19 presents the cost of emergency
admissions as a proportion of total health and social
care expenditure. Information for this indicator was
previously released up to calendar year 2020 but is now
presented to financial year 2019/20 only. PHS have
recommended that Integration Authorities do not report
information for this indicator beyond 2019/20 within
their Annual Performance Reports.
Notes
SLC print
423

Page 424

2023/24Annual Performance Report
10
Financial outturn
2023/2024
Financial information is part of our performance
management framework with regular reporting of 
financial performance to the IJB. National Health and
Wellbeing Outcome 9 also requires resources to be used
effectively and efficiently in the provision of health and
social care services.
The resources available to the IJB to deliver the delegated
functions set out in the Integration Scheme and the
Strategic Commissioning Plan (SCP) are comprised of the
financial contributions from South Lanarkshire Council
(SLC) and NHS Lanarkshire (NHSL).
Following a process of consultation, the IJB Financial
Plan 2023/2024 was approved by the IJB on 28 March
2023 and updated on 18 October 2023. The financial
envelope available to the IJB in 2023/2024 totalled
£734m.
5. Financial performance 2023/24
The expenditure incurred by the IJB in 2023/2024
totalled £727m. The net movement on reserves was a
decrease of £9.1m. 
The reserves balance at 31 March 2024 was £28.8m
(NHSL – £26.0m; SLC – £2.8m).
	
Social Care Services (£240m)
	
Family Health Services (£116m)
	
Prescribing Costs (£79m)
	
Hosted Health Care Services (£151m)
	
Hospital Acute Services/
Notional Set Aside Budget (£67m)
	
Health Care Services (£69m)
	
Housing Services (£5m)
	
Corporate Services (£0.2m)
2023/2024 Expenditure £727m
2023/2024 Funding £734m
	
SLC funding £196m
(Core – £185m; Reserves – Nil; 
Social Care Income – £8m; 
Housing Revenue Account – £3m)
	
NHSL Funding £538m
(Core – £522m; Reserves – £16m)
SLC print
424

Page 425

11
A total underspend of £6.7m (NHSL – £5.3m; 
SLC £1.4m) was reported for the financial year ended 
31 March 2024. The underspends totalled £14.3m
and the overspends totalled £7.6m. The main variances
across services are highlighted below.
(8.0) (6.0) (4.0) (2.0) 0.0 2.0 4.0 6.0 8.0
	
Prescribing Costs (£6.7m over)
	
Housing Services (£0.008m over)
	
Social Care Income (£0.6m over-recovered)
	
Social Care Services (£0.8m under)
	
Addiction Services (£3.2m under)
	
Out of Area Services (£0.9m over)
	
Area Wide Services (£0.4m under)
	
Medical and Nursing Directorate (£0.7m under)
	
Hosted Services (£1.5m under)
	
Locality and Other Services (£7.1m under)
Variances (£6.7m)
SLC print
425

Page 426

2023/24Annual Performance Report
12
Financial sustainability
The IJB is recognised as having a strong track-
record of sound financial management and robust
financial governance. The IJB has a statutory duty
to set a balanced budget.
During 2023/2024, the IJB operated in a complex,
challenging and changing environment, both locally and
nationally. The Scottish Government’s financial planning
cycle is short-term. At the start of the financial year,
there was significant uncertainty about the total funding
available. The demand across the IJB’s statutory
responsibilities also increased and additional costs were
incurred in 2023/2024. The financial projections were
therefore difficult to forecast and were subject to a high
degree of financial risk, particularly in respect of pay
negotiations, national care home contract negotiations
and projected service demand.
It is anticipated that the public sector in Scotland will
continue to face a range of challenges in the short and
medium term. Audit Scotland have also highlighted that
there remains a significant overall and recurrent budget
gap across all IJBs and that IJBs have reached the
point where ‘significant transformation’ will be needed.
Failure to make the necessary changes to how public
services are delivered will likely mean further budget
pressures in the future.
Making transformational change at the same time
as managing existing service demands and funding
pressures continues to be challenging for the IJB and
both partners.
To secure recurring financial sustainability, the
Sustainability and Value Programme (SAVP) approach
approved by the IJB on 28 March 2023 was adopted.
The SAVP approach is transformational and includes
whole system service redesign, service reduction,
prescribing efficiencies and management and
operational actions.
Recognising the necessity to move at pace, a joint
approach was also developed between the North
Lanarkshire and South Lanarkshire University Health
and Social Care Partnerships to identify health care
savings options. This will ensure consistency and
coverage when proposed as options to each IJB.
The joint approach also helps to mitigate the significant
resource and capacity required to deliver change on
this scale and at pace. The outcome of achievable
savings will be attributed to the South Lanarkshire IJB,
North Lanarkshire IJB and NHSL Health Board fairly
and transparently. The new NHSL Transformation and
Reform Programme for whole-system redesign has also
been established.
The scale of the challenge to make the IJB financially
sustainable cannot be underestimated. The current
and projected financial challenges inevitably mean
that service levels cannot be maintained, and difficult
decisions will need to continue to be taken to prioritise,
reduce or stop some services. Effective communication
and public awareness is essential to managing
expectations of future service delivery.
Setting and delivering financial
balance is fundamental to
delivering upon the priorities
within the SCP in a sustainable
manner. The IJB continues to
be committed to working with
both partners to implement
the SCP and to progress
the transformational change
required to secure recurring financial and operational
sustainability across health and social care services.
Ongoing partnership working continues to play a key
role in providing effective responses and ultimately
keeping people safe.
Performance improvement objectives are wide-
ranging and take account of complex national
legislation and strategic priorities. The Public
Bodies (Joint Working) (Scotland) Act 2014 sets
out the framework for integrating health and
social care. There is a range of other legislation,
policies, guidance and proposals which have
a bearing on the work that the IJB progresses,
and these are listed in detail in the SCP
Engaging with our Communities supplementary
information document.
https://bit.ly/Strategic-Commissioning-
Plan-2022-2025
6. Strategic overviewSLC print
426

Page 427

13
7. Governance 
and accountability
The governance framework within the IJB is set out
in the South Lanarkshire IJB Code of Corporate
Governance (bit.ly/Code-Of-Corporate-Governance)
which comprises of the systems, processes, culture
and values by which the IJB is directed and controlled.
The IJB has well-established governance
and decision-making arrangements in place
as set out in the Integration Scheme.
Supporting this is the governance structure for South
Lanarkshire University HSCP which provides a robust 
and streamlined process for efficient and effective
Partnership decision-making. The IJB holds the ultimate
decision-making and commissioning authority, with its
assurance responsibilities strengthened by the important
scrutiny provided by its Performance and Audit Sub
Committee (PASC).
The Strategic Commissioning Group (SCG) is a multi-
agency forum comprising of key professional leaders
across the HSCP, South Lanarkshire Council, NHS
Lanarkshire and Third, Independent and Carers sectors.
The group provides support and delivery of the thirteen
priorities and national health and wellbeing outcomes
detailed within the Strategic Commissioning Plan.
Furthermore, it ensures the delivery of NHS Lanarkshire’s
objectives in relation to service transformation and
financial prudence as well as relevant elements of South
Lanarkshire Council’s Connect Plan 2022/2027. A further
role of the SCG is to ensure effective links to each of our
four localities.
In 2023/24 the IJB submitted a climate change and
sustainability statement, received regular performance
monitoring reports, financial monitoring reports, risk
management updates and reviewed its Scheme of
Delegation. The IJB also reviewed the Directions it issues
to the Health Board and Local Authority (the mechanism
by which the IJB progresses the commissioning intentions
outlined in the SCP).
8. Risk
The IJB regularly reviews 
its Risk Register through 
its Performance and Audit
Sub Committee.
An annual risk workshop
is held and the IJB Risk
Register has subsequently
been revised and refined to
focus and provide visibility
on risks identified and
assessed as being very high
or high pre-mitigation.
Those risks identified at
February 2024 are as 
follows (scores below
reflecting risk scoring after
mitigation with controls):
Very high risk
• Financial sustainability
• Workforce availability 
and capacity
• Performance delivery
High risk
• Failure to meet public protection 
and legislative requirements
Medium risk
• Performance Reporting does
not capture performance across
the whole health and social
care system
• Winter pressures
SLC print
427

Page 428

2023/24Annual Performance Report
14
9. Taking a closer look
Improving unscheduled care
• Among the services which have undertaken a
significant redesign in the past year is the Primary
Care Out of Hours (PCOOH) Service.
This service covers all of Lanarkshire (excluding
Rutherglen/Cambuslang locality and the Northern
Corridor) and processes approximately 80,000
contacts per year from patients who are looking to
access urgent GP services in the out of hours period.
On a standard week, the service is operational for
118 hours and considerably longer for those weeks
where there are public holidays. 
90% of calls to the PCOOH service are referred
by NHS 24, with the remainder being professional-
to-professional calls from community nursing, the
Scottish Ambulance Service, community pharmacy
and community hospitals.
Over the last year, there has been a review of the
working model with a significant expansion in the
multi-disciplinary workforce. In turn, this has led to
a service with much greater stability in being able to
manage the demand and associated flow through
the service as well as ensuring patients are able to
access care by the right clinician in a timely manner.
Advanced Nurse Practitioners, Nurse Practitioners,
salaried GPs, Pharmacists, and Paramedics now
comprise the clinical workforce with support from a
dedicated administrative team. In March 2024, 
a Deputy Clinical Director was recruited to the
service. Two Specialist Palliative Care Nurses
have been introduced on Saturdays and Sundays
from 8am to 4pm. 
“All of the staff involved – NHS 24,
receptionist, nurse and doctor were
very pleasant and professional… I really
appreciated the care and support given 
by everyone.” 
Feedback from patient attending PCOOH.
• Innovative work in communities continues to
support people to live well for longer at home. This
is an important and growing part of health and
care delivery. One vital element is the community
expertise and compassion allowing more people to
exercise their choice of being able to die in their own
homes when they wish to do so. As part of our winter
messaging, https://bit.ly/an-enhanced-feature on
Lanarkshire’s award winning, end of life community
nursing service (led by South Lanarkshire University
HSCP) was published.
• The dedicated Community Nursing team
in Lanarkshire ensures end-of-life needs are
fully recognised and provides a comprehensive,
consistent and compassionate care strategy. The
team is available around the clock, with direct
telephone access for families to contact outside of
planned visits to seek advice or request additional
support.
Optimising intermediate care
• The intermediate care element of the
Blantyre Life Care Campus opened in March
2023 and has the capacity to support 20 people at
any one time. The facility offers step-down support
for South Lanarkshire residents aged 50 and over.
Patients who have been assessed as clinically fit for
discharge and no longer require in-patient treatment
and have rehabilitation potential, can be admitted to
the Intermediate Care unit for a maximum of 
42 days. The average length of stay for service
users over past year is 27 days which is a
significant improvement from the previous test of
change and temporary model which averaged 
44 days. The service is exceeding the initial flow
target of 42 days and therefore has the potential
to manage an increase volume of people. It is
contributing to reducing pressure on in-patient
services within the NHS. 90% of people surveyed
on the service rated it as excellent/very good.
SLC print
428

Page 429

15
Case Study
Blantyre Life (finalist in the Scottish
Property Awards – Health Care
Development of the Year)
After moving into the technology-enabled
community at the Blantyre Life care campus, Ann
said she has been “brought back to life.” The
former foster carer and psychiatric nurse said her
life was taken to the darkest of places over the
last decade following shattering personal adversity.
Blantyre Life housing and care campus champions
the ‘home first’ principle, with an emphasis on
enabling more people to live as independently as
possible within their own homes. It combines a
20-bedded intermediate care facility and 20 new
technology-enabled properties – of which Ann is a
community member. All homes are equipped with
state-of-the-art technology to support independent
living. The tech-enabled houses are designed
to be fully accessible, making it easy for Ann to
move around. 
The facility is fantastic in itself and has
enabled me to regain a sense of being able to
do things for myself again. That, in turn, has
alleviated a lot of pressure and worry from my
sister, Mary, who has helped care for me. 
It has felt like ‘a new lease of life’ – but in
a very gradual sense. I’ve slowly started to
reconnect with people through the many
activities here, from the Yoga classes to the
recent visit of school children who came to
sing Christmas carols for us. The facility is, of
course, incredible – and while it feels wrong
to say it’s just ‘bricks and mortar,’ without the
health and social care staff, it would be. 
They are phenomenal. They are this place’s
beating heart – and they’ll always have a place
in mine.
Of those who used the service half returned home
without care which reinforces the importance
of people being discharged from hospital to be
assessed. 
Similar to intermediate care the Home First Care
at Home Service was launched in 2022. The
service aims to ensure people return home without
delay, safely and supported. It does this by working
with service users leaving hospital or living in the
community and improves individual outcomes
through rehabilitation and re-ablement interventions.
The integrated multi-disciplinary teams consist
of occupational therapists, physiotherapists and
care at home staff working together to maximise
independence, thereby reducing reliance on statutory
services. Work to date shows that approximately
35% of the hours initially assessed when in
hospital are no longer required at the end of the
‘Home First’ phase of the person’s care exceeding
the 25% target.
“I would like to commend the work of my
uncle’s carer. He is outstanding in his
care and dealings with my uncle. Nothing
is a bother and never wavers in his care.
Words cannot express the character
of such a carer. We cannot thank him
enough for all he does.” 
Feedback from relative.
SLC print
429

Page 430

2023/24Annual Performance Report
16
Promoting early intervention,
prevention and health
improvement
Physical Activity Prescriptions
South Lanarkshire Leisure and Culture
received 3741 referrals for Physical Activity
Prescriptions across the partnership area. Reasons for
referral include mental health, general fitness, weight
management, pain management, Musculoskeletal and
falls. Gerry was referred to the gym by his GP through
the Physical Activity Prescription pathway as he has
peripheral neuropathy – which is essentially chronic
nerve damage in his arms and legs. This causes severe
pain and mobility issues with Gerry relying on a mobility
scooter for day-to-day activities.
Gerry was hesitant at first as his mobility was so poor
he didn’t think there were any exercises he would be
able to do. However, staff introduced him to Motomed
which allowed him to work his arm and legs. 
Gerry said, 
“I keep telling anyone who will listen how
good Motomed is and the staff at Eastfield
create such a warm and welcoming
atmosphere. I never thought going to the
gym would be the highlight of my day!”
Telehealth and telecare
There is a growing range of telehealth and telecare
options which people can access. The following
case study provides an insight to some of the real
benefits to people who use them in terms of service
and convenience whilst at the same time, offering
transformational and sustainable options in service
delivery which the partnership will continue to promote.
Case Study
Connect Me
Zoe has two young children, works full time and
has a busy life. She has high cholesterol and
blood pressure and was asked to visit the GP
practice regularly, however struggled to fit these
visits into her already busy schedule. She was
often stressed when her blood pressure was being
measured which resulted in inaccurate blood
pressure readings. The practice nurse suggested
remote health monitoring to allow Zoe to measure
her blood pressure from home and at a time of
her choosing. The Florence text messaging system
enabled Zoe to self-manage her own health. Her
high blood pressure is now under control and Zoe
states she is in great health.
When I discovered I had high blood
pressure, it was concerning. Being offered the
use of Florence was a brilliant alternative – 
and I think the hassle free-nature of it, without
having to commute and take time out of a busy
day, probably gave a truer reflection of my 
day-to-day readings.
Technology Enabled Care
Lanarkshire’s Technology Enabled Care
(TEC) team continues to provide an integrated
approach to sustaining people to live independently
at home and within their community. Demand for
assistive technology has continued to increase during
2023/2024 with 24% of hospital discharge
requests supported through the Home First pathway
and telecare installations taking place within 24 hours
of the request being approved.
The transition of alert alarms from analogue to digital
continues to make good progress with 6580 digital
alert alarms installed during 2023/24. A priority
focus is sustainability with the team having a target to
identify 70 alarms per month that can be recycled
and reused. To date 965 digital alert alarms have
been returned/uplifted and reused saving £156,330
on the cost of replacing these alarms as well as the
associated environmental benefits.
SLC print
430

Page 431

17
Supporting carers
The carers’ commissioned services from 
Lanarkshire Carers (Adult Carers) and Action
for Children (Young Carers) continue to support
increased numbers of carers/young carers in the
community. For 2023/2024, Lanarkshire Carers
reported the following:
• 1,398 new carers identified in 
South Lanarkshire, an increase of 26% on the
previous year
• 1,161 adult carer support plans
progressed
• 3,533 carers engaged and were
supported
• 6,825 total carers known to Lanarkshire
Carers
• Creative Breaks Time to Live funding for 
2023/24 has been fully allocated with 
361 carers in South Lanarkshire benefiting
from grant funding through this initiative
•  Action for Children were working with 
202 young carers, an increase of 11% on
the previous year
A renewed Carers Strategy 2023-2026 
https://bit.ly/Carers-Strategy-2023-2026 was
published alongside a strategy on a page.
A partnership statement was developed with
Lanarkshire Carers, ensuring all services are open
to carers aged 18 years and older living in South
Lanarkshire. Delegated responsibility to lead on the
provision of Adult Carer Support Plans in specific
circumstances is included in the Statement. Every
carer has a right to be offered an Adult Carer Support
Plan and this partnership statement sets out local
arrangements and responsibilities to meet this duty.
https://bit.ly/Partnership-Statement
Lanarkshire Carers gained the Carer 
Positive Award (at exemplary level) which is
presented to employers in Scotland who can
demonstrate that they have a working environment
where carers feel valued and supported.
SLC print
431

Page 432

2023/24Annual Performance Report
18
Supporting the delivery of
core and statutory duties
To support the delivery of core and statutory
functions while securing financial sustainability
a Sustainability and Value Programme (SAVP)
approach was endorsed by the IJB on 28 March
2023. This included the SAVP Option Appraisal
Screening Scale, designed to ensure that potential
savings options are appraised, prioritised and
then presented to the IJB for consideration in a
manner consistent with statutory obligations and
professional requirements. The demand across
statutory responsibilities has increased over 
recent years.
The screening scale reflects the advice of the
HSCP’s Medical Director, Nurse Director, Allied
Health Professions Director and the SLC Chief
Social Work Officer and illustrates our commitment
to protect the most vulnerable people in South
Lanarkshire. We can provide three key assurances
to people across South Lanarkshire.
• The first focus of our staff is to keep
people safe.
• Public protection and clinical safety will
be prioritised as will the professional
registration requirements for our staff.
• Where significant transformational change
does need to occur, the IJB and HSCP
will engage with the relevant stakeholders
in line with statutory obligations
Sustainability and value option
appraisal screening scale
Public
protection and
clinical safety
Professional
registration
requirements
Service redesign
or reduction with
impact 
on outcomes
Service redesign
or reduction with
no/limited impact
on outcomes
Benchmarking
and efficiencies
As highlighted throughout this report, positive work is
being taken forward to deliver the intentions set out in
the IJB Strategic Commissioning Plan. It is the intention
of the IJB to continue to pursue its ambitions as set out
on the Strategic Commissioning Plan on a Page in such
a manner that recognises the realities of the environment
within which it continues to operate, makes best use
of the resources available to it and uses evidence and
learning to improve provision wherever possible.
Our plan on a page
provides a clear
summary (opposite).
10. Looking to the future
SLC print
432

Page 433

19
Section 2: Plan on a page
Context:
•  Changing needs of the population
•  Meeting the needs of all our
communities fairly and equally
•  Applying evidence of what works
•  Best use of the public pound
•  Feedback from our communities –
what is important to people
Values: Empathy ElevateEmpower
Strategic Commissioning Plan
South Lanarkshire Integration Joint Board
2022–25
Vision:
Working together to improve health 
and wellbeing in the community – 
with the community
Plan on 
a page
• Evidence
• Innovation
• Learning
• Partnerships
• Technology
• Leadership
• Our staff
• Our communities
• Our commitment
Key enablers
Our priorities
Priority 1: Sustaining statutory social
care and core health care functions
Priority 2: Greater emphasis on early
intervention, prevention and inequalities
Priority 3: Addressing mental 
health and addictions
Priority 4: Improving unscheduled care 
and optimising intermediate care
Priority 5: Supporting carers
Priority 6: Promoting self-care
and self-management including
technology enabled care
Priority 7: Improving
transitional arrangements
Priority 8: Facilitating single
point of access and increasing
access to seven-day services
Priority 9: Investing in 
enablers to support integration
Priority 10: Promoting suitable
and sustainable housing
Priority 11: Contributing 
to homelessness prevention 
and reduction
Priority 12: 
Responding to 
the impact of 
the COVID-19 
pandemic
https://vimeo.com/739607180
https://vimeo.com/689689109/cb5228bd69
SLC print
433

Page 434

Produced for South Lanarkshire Integration Joint Board by Communications and Strategy. 067438/Sep24
If you need this information 
in another language or format, 
please contact us to discuss how 
we can best meet your needs.
Phone: 0303 123 1015
Email: equalities@southlanarkshire.gov.uk
SLC print
434