Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 18 June 2024 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 26 June 2024
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Susan Kerr, Eileen Logan, Katy
Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald,
Mark McGeever, Davie McLachlan, Richard Nelson, Mo Razzaq, Kirsten Robb, John Ross, David
Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Elise Frame, Celine Handibode,
Graeme Horne, Martin Hose, Ross Lambie, Elaine McDougall, Norman Rae, Graham Scott, David
Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 8 May 2024
submitted for approval as a correct record.  (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Revenue Budget Year-End – 2023/2024
Report dated 3 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
15 - 26 
4 Revenue Budget Monitoring for Period 2 - 1 April 2024 to 17 May 2024
Report dated 10 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
27 - 34 
5 Capital Budget Monitoring Final Outturn – 2023/2024
Report dated 5 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
35 - 42 
6 Capital Budget 2024/2025 and Monitoring for Period 2 - 1 April 2024 to 17
May 2024
Report dated 7 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
43 - 54 
7 Additional Funding from Scottish Government and Other External Sources
Report dated 4 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
55 - 58 
8 Employee Workforce Monitoring Information - April 2023 to March 2024
Yearly Summary
Report dated 23 May 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
59 - 82 
Item(s) for Decision 
9 2025/2026 to 2027/2028 Revenue Budget Strategy
Report dated 6 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
83 - 100 
10  South Lanarkshire Council Armed Forces Community Covenant Strategy
Report dated 17 May 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
101 - 120 
11  Recommendations Referred by Community and Enterprise Resources
Committee
Report dated 18 June 2024 by the Chief Executive.  (Copy attached) 
121 - 128 
12  South Lanarkshire Local Heat and Energy Efficiency Strategy (LHEES)
Report dated 5 June 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
129 - 252
2

Page 3

13  South Lanarkshire's State of the Environment Report 2023
Report dated 7 June 2024 by the Executive Director (Community and Entreprise
Resources).  (Copy attached) 
253 - 266 
Item(s) for Noting 
14  Strategic Environmental Assessment Progress 2023/2024
Report dated 6 June 2024 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
267 - 270 
15  South Lanarkshire Local Housing Strategy Annual Review 2023/2024
Report dated 31 May 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
271 - 280 
16  Resource Plans and Connect Reporting 2024/2025
Report dated 24 May 2024 by the Chief Executive.  (Copy attached) 
281 - 284 
17  Amendments to Committee Memberships
Report dated 7 June 2024 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
285 - 286 
Urgent Business 
18  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 8 May 2024 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Margaret Cooper, Councillor Poppy Corbett (substitute for Councillor Kenny
McCreary), Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Maureen
Devlin), Councillor Gladys Ferguson-Miller, Councillor Lynsey Hamilton, Councillor Martin Hose
(substitute for Councillor Richard Nelson), Councillor Susan Kerr, Councillor Eileen Logan, Councillor
Katy Loudon, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Catherine McClymont,
Councillor Lesley McDonald, Councillor Mark McGeever, Councillor Davie McLachlan, Councillor Mo
Razzaq, Councillor Kirsten Robb, Councillor John Ross, Councillor David Shearer, Councillor
Margaret B Walker 
Councillors' Apologies:
Councillor Maureen Devlin, Councillor Kenny McCreary, Councillor Richard Nelson 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development; C Park,
Head of Roads, Transportation and Fleet Services; I Ross, Project Manager
Finance and Corporate Resources
J Taylor, Executive Director; M Milne, Head of Personnel Services; A Norris, Administration Assistant;
T Slater, Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
S Gibson, Executive Director; S Egan, Head of Housing Services: G McParland, Property Manager
(Assets and Estates)
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s)
Shearer Representation on Outside Bodies - Care and
Repair in South Lanarkshire 
Chair of Care and
Repair in South
Lanarkshire Board 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 20 March 2024 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
5

Page 6

3 Revenue Budget Monitoring for Period 1 April 2023 to 23 February 2024 and
Probable Outturn 
A report dated 18 March 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the General Fund Revenue Account and the Housing
Revenue Account for the period 1 April 2023 to 23 February 2024 and a projection for the year to
31 March 2024. 
The report:- 
 summarised the previously reported probable outturn position for the Council’s General
Fund Revenue Account to 31 March 2024
 provided details of the forecast position on the Housing Revenue Account for the financial
year
 provided details of the position on the General Fund Revenue Account and the Housing
Revenue Account respectively to 23 February 2024 
The outturn position for the General Fund, after proposed transfers to reserves totalling £14.985
million, resulted in an underspend of £9.000 million.  Full details of the transfers to reserves had
been reported to the meeting of the Executive Committee held on 24 January 2024.  The forecast
position before and after transfers to reserves was detailed in appendices 1 and 2 to the report. 
Appendix 2 included the probable outturn underspend of £9.000 million as a transfer to reserves,
resulting in a breakeven position for the Council’s 2023/2024 probable outturn. 
At 23 February 2024, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £1.760 million.  Details on the probable outcome position were
referred to in section 5.2 of the report. 
At 23 February 2024, the Housing Revenue Account showed a breakeven position and the
forecast to 31 March 2024 on the Housing Revenue Account was also a breakeven position. 
The Committee decided: 
(1) that the Council’s breakeven probable outturn position after transfers to reserves, as detailed
in section 4.1 of the report, be noted; 
(2) that the underspend of £1.760 million on the General Fund Revenue Account at 23 February
2024, as detailed in section 5.1 of the report, be noted; and 
(3) that the breakeven position on the Housing Revenue Account at 23 February 2024 and the
forecast to 31 March 2024 of breakeven, as detailed in sections 6.1 and 6.2 of the report,
be noted. 
[Reference: Minutes of 20 March 2024 (Paragraph 3)] 
4 Capital Budget 2023/2024 and Monitoring for Period 12 - 1 April 2023 to 23
February 2024 
A report dated 9 April 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on progress of the General Fund Capital Programme and the Housing Capital
Programme for the period 1 April 2023 to 23 February 2024. 
At its meeting on 20 March 2024, the Committee had noted a General Fund Capital Programme
for 2023/2024 totalling £78.296 million.  A revised programme of £78.365 million was now
anticipated which included proposed adjustments to the programme totalling a net increase of
£0.069 million.  The proposed adjustments were detailed in Appendix 1 to the report.  The increase
was in relation to the late distribution of 2023/2024 funding made available for Free School Meals.    
6

Page 7

At 23 February 2024, £41.623 million had been spent on the General Fund Capital Programme,
against a budget for the period of £42.242 million, resulting in spending being slightly behind
programme in the sum of £0.619 million which was as a result of timing of spend on a number of
projects.  Actual funding received to 23 February 2024 totalled £71.833 million. 
The Housing Capital Programme 2023/2024, noted by the Executive Committee at its meeting on
20 March 2024, totalled £67.443 million.  Programmed funding for the year also totalled £67.443
million and details of the position of the programme at 23 February 2024 were provided in
Appendix 4 of the report. 
At 23 February 2024, the budget for the Housing Capital Programme amounted to £50.834 million. 
Expenditure for the period totalled £50.290 million and actual funding received to 23 February
2024 also amounted to £50.290 million. 
The Committee decided: 
(1) that the period 12 position at 23 February 2024 of the General Fund Capital Programme, as
detailed in appendices 1 to 3 and the Housing Capital Programme, as detailed in Appendix
4 of the report, be noted; and 
(2) that the programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 20 March 2024 (Paragraph 4)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 18 March 2024 by the Executive Director (Finance and Corporate Resources) was
submitted on additional funding, totalling £0.528 million, which had been made available to the
Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2023/2024 
(£m) 
Various 0.459 
Total 0.459 
Capital Funding 
Resource 2023/2024 
(£m) 
Education 0.069 
Total 0.069 
Overall Total 0.528 
The Committee decided: that the report be noted. 
[Reference: Minutes of 24 January 2024 (Paragraph 5)] 
6 Transformation Fund Proposals and First Phase 
A joint report dated 15 March 2024 by the Executive Directors (Housing and Technical Resources)
and (Community and Enterprise Resources) was submitted on the proposed first phase of
investment from the Transformation Fund. 
7

Page 8

The Corporate Asset Management Plan set out the approach to ensuring that the Council’s
property portfolio was suitable for its needs in terms of scale, condition, location, suitability and
corporate image. 
In light of the significant budgetary pressures facing local government and the challenges of net
zero targets, consideration had been given to identifying what should be defined as the Council’s
property estate and where focus for modernisation, capital investment, repairs and maintenance
budgets should be. 
In recognition of the service delivery and community challenges arising from the transformation of
the property estate managed by South Lanarkshire Leisure and Culture (SLLC), the Council, at
its meeting on 22 February 2023, had approved funding for capital investment to help modernise
the leisure and culture estate, optimise use of assets and assist in the transition towards net zero. 
A Transformation Fund of £13 million had been included within the Council’s financial plans in the
capital programme. 
Information was provided on:- 
 the themes and criteria used to identify investment in property assets through the Fund
 projects proposed for the first phase of investment, as outlined in Appendix 1 to the report 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the first phase of investment from the Transformation Fund, amounting to around £8.4
million, as detailed in Appendix 1 of the report, be approved; and 
(2) that it be noted that proposals for a further phase of investment would be prepared for
consideration in Quarter 3 2024/2025. 
[Reference: Minutes of South Lanarkshire Council of 22 February 2023 (Paragraph 4)] 
7 Recommendations Referred from Community and Enterprise Resources
Committee 
A report dated 23 April 2024 by the Chief Executive was submitted on recommendations referred
to this Committee by the Community and Enterprise Resources Committee at its meeting of 23
April 2024 in relation to:- 
 Centre West Shopping Centre, East Kilbride – Transfer of Ownership to South Lanarkshire
Council
 Glasgow City Region City Deal – Stewartfield Way/East Kilbride Town Centre 
The recommendations in relation to the Centre West Shopping Centre, East Kilbride – Transfer
of Ownership to South Lanarkshire Council were as follows:- 
 that the position in relation to the administration of Centre West Shopping Centre, East
Kilbride and the associated risks to the Council be noted
 that entering into a Heads of Terms with Interpath for the transfer of Centre West Shopping
Centre, East Kilbride to South Lanarkshire Council be approved
 that the appointment of a professional team to manage the transfer of ownership of Centre
West Shopping Centre, East Kilbride to the Council, and the subsequent demolition of the
site, be approved  
8

Page 9

The recommendations in relation to the Glasgow City Region City Deal – Stewartfield Way/East
Kilbride Town Centre were as follows:- 
 that the proposed next steps in developing the Outline Business Case (OBC) and delivering
the Stewartfield Way/East Kilbride Town Centre Infrastructure project be approved
 that a report be submitted to the Glasgow City Region Programme Management Office,
following endorsement by the Community and Enterprise Resources Committee and
approval by the Executive Committee, to seek permission to rescope the project and develop
the OBC for a Stewartfield Way and East Kilbride Town Centre project 
Councillor Robb proposed an amendment to the recommendations in relation to the Glasgow City
Region City Deal – Stewartfield Way/East Kilbride Town Centre project which failed to find a
seconder. 
The Committee decided: 
(1) that the recommendations referred by the Community and Enterprise Resources Committee
of 23 April 2024 in relation to the transfer of ownership to the Council of Centre West
Shopping Centre, East Kilbride be approved; and 
(2) that the recommendations referred by the Community and Enterprise Resources Committee
of 23 April 2024 in relation to the next steps of the Glasgow City Region City Deal –
Stewartfield Way/East Kilbride Town Centre infrastructure project be approved. 
[Reference: Minutes of Community and Enterprise Resources Committee of 23 April 2024
(Paragraphs 9 and 10)] 
Councillor Ferguson-Miller joined the meeting during this item 
8 Lanarkshire British Sign Language Plan 2018 to 2024 Update; Proposed Shared
Lanarkshire British Sign Language Plan 2024 to 2030 
A report dated 23 April 2024 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on:- 
 the progress of the shared Lanarkshire British Sign Language (BSL) Plan 2018 to 2024,
which shared the long-term goals of the National BSL Plan, developed to meet the
requirements of the British Sign Language (Scotland) Act 2015
 the proposed shared Lanarkshire British Sign Language (BSL) Plan 2024 to 2030, attached
as Appendix 1 to the report 
The Committee decided: 
(1) that the progress on the Lanarkshire BSL Plan 2018 to 2024 be noted; and 
(2) that the shared BSL plan 2024 to 2030, attached at Appendix 1 to the report, be approved. 
9 Representation on Outside Bodies – Care and Repair in South Lanarkshire
Advisory Committee 
A report dated 24 April 2024 by the Executive Director (Finance and Corporate Resources) was
submitted requesting approval of the appointment of Councillor Walker as the Council’s
representative on the Care and Repair in South Lanarkshire Advisory Committee. 
At its meeting on 29 June 2022, the Committee noted that, due to the large number of requests
for elected member involvement from organisations, the Council was not in a position to
accommodate every request.  This included Care and Repair in South Lanarkshire. 
9

Page 10

The Council was now in a position to appoint a representative to Care and Repair in South
Lanarkshire Advisory Committee and Councillor Walker, as Chair of Social Work Resources
Committee, had intimated her interest in an appointment to this organisation. 
The Committee decided: that Councillor Walker, as Chair of Social Work Resources
Committee, be appointed as the Council’s representative on
the Care and Repair in South Lanarkshire Advisory
Committee. 
[Reference: Minutes of 29 June 2022 (Paragraph 8)] 
Councillor Shearer, having declared in interest in this item, withdrew from the meeting during its
consideration 
10 Strathclyde Regional Bus Strategy - Recommendations for Future Delivery of the
Regional Bus Network 
A report dated 17 April 2024 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the development of the Strathclyde Regional Bus Strategy
(SRBS), together with an overview of the proposed Council response to the consultation. 
Information was provided:- 
 on the background to the deregulation of bus services
 on the importance of bus provision and concerns about the current model
 outlining the Council’s proposed response to the consultation
 on the next steps that would be taken by Strathclyde Partnership for Transport following the
consultation 
The Committee decided: that the contents of the report be approved which would form
the Council’s response to the Strathclyde Regional Bus
Strategy consultation. 
[Reference: Minutes of South Lanarkshire Council of 1 November 2023 (Paragraph 10)] 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
11.25am.  The meeting reconvened at 11.35am 
11 South Lanarkshire Progressive Housing Framework 
A joint report dated 9 April 2024 by the Executive Director (Housing and Technical Resources)
and Director, Health and Social Care was submitted on the South Lanarkshire Progressive
Housing Framework. 
Progressive Housing was an approach that reflected the Council’s response to changing housing,
support and care needs over the course of a person’s life.  It aimed to promote independent living
through the re-focusing of operating models in relation to the types of accommodation provided,
the location of new housing sites, the way care was provided and the level of support delivered. 
The Framework was attached as Appendix 1 to the report. 
An officer responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the content of the South Lanarkshire Progressive Housing Framework, attached as
Appendix 1 to the report, be noted; and  
10

Page 11

(2) that arrangements for the implementation of the Progressive Housing Framework be noted. 
[Reference: Minutes of Housing and Technical Resources Committee of 8 November 2023
(Paragraph 8)] 
12 Homelessness Pressures – Impact and Mitigation 
A report dated 26 March 2024 by the Executive Director (Housing and Technical Resources) was
submitted on the unprecedented demand for statutory homeless services, particularly temporary
accommodation and the actions being progressed to mitigate the continued challenges. 
At its meeting on 7 February 2024, the Housing and Technical Resources Committee noted a
report on the unprecedented pressures currently facing homeless services in South Lanarkshire,
highlighting that:- 
 there was no sign of abatement
 the extremely challenging circumstances were being experienced nationally 
The report outlined:- 
 the local and national context
 the current position in South Lanarkshire
 actions to mitigate the impact
 the future work that would be undertaken to continue to address the situation 
An officer responded to members’ question on various aspects of the report. 
The Committee decided: 
(1) that the scale and nature of the increase in demand for homelessness assistance, both
nationally and locally, be noted; 
(2) that heightened pressure and impact within South Lanarkshire resulting from the increase,
which exceeded the national experience, be noted; and 
(3) that the actions being progressed to mitigate the pressures, as detailed in the report, be
noted. 
[Reference: Minutes of Housing and Technical Resources Committee of 7 February 2024
(Paragraph 11)] 
13 Urgent Business 
There were no items of urgent business. 
14 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraph 2, 6 and 9 of Part
I of Schedule 7A of the Act. 
11

Page 12

15 Former Bairds Building, Hamilton 
A report dated 16 April 2024 by the Executive Director (Community and Enterprise Resources)
was submitted seeking approval to waive the Council’s pre-emption right over the former Bairds
building in Hamilton to allow its sale to a third party. 
Information was provided on:- 
 the background to the sale of the building
 the identification of the building as a key site to achieve the vision for the town centre 
In response to a member’s question in relation to guarantees about the development of the site,
the Head of Administration and Legal Services advised that this would be limited to statutory and
regulatory requirements. 
The Committee decided: 
(1) that the Council waive its pre-emption right over the former Bairds building to allow the sale
of the building by J D Wetherspoon PLC to a third party and subsequent redevelopment of
the site; and 
(2) that the Head of Administration and Legal Services be authorised to enter into such
agreement to affect the discharge as was in the best interests of the Council. 
[Reference: Minutes of 13 February 2019 (Paragraph 11) and 21 February 2024 (Paragraph 6)] 
16 Hamilton Master Plan - Newcross Centre, Hamilton 
A joint report dated 5 April 2024 by the Executive Directors (Housing and Technical Resources),
(Community and Enterprise Resources) and (Finance and Corporate Resources) was submitted
providing an update on:- 
 the initial actions required in the implementation of the Hamilton Town Centre Masterplan
 the financial and property related performance of Newcross Shopping Centre, Hamilton,
highlighting the risks associated with the continued operation and management of the Centre 
Newcross Centre, which was owned by the Council, had seen a marked and continued decline in
recent years and was an ongoing financial liability.  As well as there being a requirement for
substantial investment to improve the fabric of the building, the retail market for covered shopping
centres in town centre locations like Hamilton was now largely non-existent and, commercially,
there was no future for the Centre in its current form. 
Information was provided on the impact of the Centre’s closure and exit strategy.  Discussion
would be entered into with existing tenants with a view to securing vacant possession of the Centre
and the Council’s Enterprise and Sustainable Development Services would undertake further
design and feasibility work and develop the scope of the demolition tender. 
An officer responded to members’ questions in relation to various aspects of the report. 
The Committee decided: 
(1) that discussions be entered into with existing tenants with a view to securing vacant
possession of New Cross Shopping Centre; 
(2) that an exit strategy be implemented to limit ongoing risk and financial liability through the
closure of the Centre as soon as practicable;  
12

Page 13

(3) that redevelopment options be developed in line with the Hamilton Town Centre Masterplan;
and 
(4) that Enterprise and Sustainable Development undertake further design/feasibility work and
develop the scope for the demolition tender. 
[Reference: Minutes of 21 February 2024 (Paragraph 6)] 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Year-End – 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the overall financial position of the Council’s General
Fund Revenue Account and Housing Revenue Account for the period 1 April
2023 to 31 March 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that across Resources, Corporate Items, Loan Charges and Council Tax, the
year-end underspend of £0.128 million, after proposed Transfers to Reserves
(section 4 and Appendix 1), be noted;
(2) that an additional £0.174 million underspend in the element of the Adult and
Older People budget delegated to the Integration Joint Board (IJB) (section
4.5), which the Council allows the IJB to retain within their reserves for future
care costs, be approved;
(3) that the underspend of £0.128 million is after the Probable Outturn Transfers to
Reserves of £23.985 million previously approved by members at (Appendix 3),
be noted;
(4) that the requests for additional year-end Transfers to Reserves totalling £2.238
million (Appendix 4) be approved; 
(5) that the £0.128 million underspend after proposed Transfers to Reserves be
set aside to assist in future Budget Strategies, including pay award
requirements (section 4.11), resulting in a break-even position for the Council,
be approved; and
(6) that the break-even position on the Housing Revenue Account (section 5), be
noted. 
3. Background
3.1. This report will summarise the 2023/2024 year-end position for the Council’s General
Fund Revenue Account and Housing Revenue Account. 
3.2. Section 4 details the final position for the financial year, as well as the movement from
the previously reported Probable Outturn position for the Council. The Housing
Revenue position is shown in section 5.  
3
15

Page 16

3.3. Appendix 1 to the report details the overall spend position for the current year.  This
position includes all Transfers to Reserves. The Transfers to Reserves approved at
Probable Outturn totalling £23.985 million (Executive Committee, 24 January 2024)
are shown in Appendix 3. There are no proposed changes to these Transfers at year-
end.  However, there are new Transfers to Reserves proposed, and these are shown
in Appendix 4.   
4. General Services – 2023/2024 Year-End Position
4.1. For reference, the Council’s overall Probable Outturn (including approved Transfers
to Reserves totalling £23.985 million) (Executive Committee, 24 January 2024) was a
forecast break-even position.  This included the corporate Transfer to Reserves of
£9.000 million.   
4.2. The year-end outturn position is showing an underspend of £0.128 million. This is after
proposed Transfers to Reserves at year-end.  This is summarised in Table 1, along
with the movement from the break-even position agreed at Probable Outturn.  This is
an improvement of £0.128 million (from the break-even at Probable Outturn to the
underspend of £0.128 million at financial year-end).     
Table 1 – General Service Year-End 2023/2024 (After Transfers to Reserves) 
Probable
Outturn 
£m
Year-End 
£m
Movement
from
Probable
to Outturn
£m
Resource Position (Appendix 2, section 2 to 8) (0.511) (0.453) 0.058
Loan Charges (Appendix 2, section 9) 0.198 0.949 0.751
Corporate Items (Appendix 2, section 10) 6.051 5.403 (0.648)
Corporate Items Strategy – Transfers to
Reserves (Probable Outturn Underspend
Transferred to Reserves)
(9.000) (9.000) -
Council Tax (Appendix 2, section 12) 3.262 3.229 (0.033)
General Services Underspend 2023/2024 - 0.128 0.128 
4.3. This report and appendices provide a detailed analysis of the Council’s financial
position at the end of the year.  Appendices 1 and 2 provide detail of the year-end
position with a summary of the £0.128 million noted in sections 4.4 to 4.12.   
4.4. Resources: The overspend position of £0.453 million is after taking into account the
Transfers to Reserves agreed at the Probable Outturn, as well as the additional
transfers being proposed by the Resources as part of the year-end position. This
overspend in Resources is less than forecast at Probable Outturn by £0.058 million,
and in the main reflects a minor reduction in spend in Finance and Corporate
Resources. Further detail is noted in Appendix 2 (sections 1 to 8). The Transfers at
Probable Outturn and year-end are detailed in Appendices 3 and 4, respectively.  The
Resources’ Transfers to Reserves agreed at Probable Outturn were £1.750 million. 
4.5. Within Social Work Resources, the year-end position for Adult and Older People
includes a £1.446 million commitment in relation to the element of the budget
delegated to the Integrated Joint Board (IJB). This is an increase of £0.174 million on
the £1.272 million predicted at Probable Outturn.  This commitment reflects the agreed
position at Probable Outturn where the Council allowed the IJB to retain this non-
recurring underspend within their reserves, earmarked for future care costs, in line
16

Page 17

with the approach to integrating health and social care budgets.  It is proposed that
these monies are retained in the Council’s Balance Sheet and will be available for use
by the IJB. 
4.6. Loan Charges: There is an underspend of £0.949 million after the Transfers to
Reserves approved at Probable Outturn (Appendix 3) and Transfers to Reserves
proposed at year-end (Appendix 4). This is a favourable movement of £0.751 million
from the position reported at Probable Outturn and reflects cash balances available to
invest being higher than anticipated.  There was also a slightly higher interest rate on
deposits.  There is also a benefit to the HRA. 
4.7. Corporate Items: There is a net underspend of £5.403 million after Transfer to
Reserves (Appendices 2 and 3).  This is an adverse movement of £0.648 million from
Probable Outturn. However, this position includes 3 notable movements since the
Probable Outturn.  These are shown in Table 2. 
Table 2: Notable Movements in Corporate Items Since Probable Outturn 
£m
ALEO Baseline Excesses
The anticipated financial detriment of ALEO Charitable Relief
Baseline Excesses in 2023/2024 is £0.125 million. This reflects the
movement in base properties utilised by the Council’s Arm’s Length
External Organisation (ALEO) - (South Lanarkshire Leisure and
Culture SCIO)
(0.125)
Strathclyde Regional Council Intromissions
Glasgow City Council have issued a bill for intromissions in relation to
claims/litigation for the former Strathclyde authorities, for 2023/2024. 
The Council has received a payment request due by the end of June
2024.  The Council’s portion of the overall liability is £0.730 million. 
(0.730)
Non Domestic Rates Incentivisation Scheme (NDRIS)
The Council has been advised of an anticipated financial benefit of
NDRIS in 2023/2024, totalling £0.339 million.  The Scottish
Government sets annual targets for growth (buoyancy) and councils
who achieve their target retain 50% of the additional income
generated above the target.  
0.339
Other Minor Movements (0.132)
Revised Position (0.648) 
4.8. Council Tax: The over recovery for the year is £3.229 million, representing a minor
adverse movement of £0.033 million since the Probable Outturn. Further detail is
provided in Appendix 2 (section 12). 
4.9. Transfers to Reserves:  The year-end underspend of £0.128 million includes total
Transfers to Reserves of £26.223 million. This includes the Transfers to Reserves
approved as part of the Probable Outturn (£23.985 million) (Appendix 3). 
4.10. Additional Transfers to Reserves proposed at year-end total £2.238 million. This
reflects the requested carry forward of funding in Reserves to allow committed areas
of spend to be incurred in 2024/2025.  Details of these additional proposed transfers
are provided in Appendix 4. If agreed, this takes the total Transfers to Reserves at
year-end to £26.223 million.  
17

Page 18

4.11. The final underspend of £0.128 million is now confirmed and is proposed that this is
set aside to assist in future Budget Strategies, including pay award requirements.   
4.12. If this proposal is agreed, then these monies will be transferred to Reserves and will
result in the Council returning a break-even position for financial year 2023/2024. 
4.13. The transfer of the £0.128 million year-end underspend to Reserves will take the total
Transfers to Reserves for the year to £26.351 million. 
4.14. Year-end Accounting Adjustments:  As part of the year-end process, expenditure
is reviewed to identify whether it is Revenue or Capital spend.  While these are not
currently reflected in these monitoring figures, any spend that should be classed as
capital will be removed before the closure of the Council’s Accounts.  This will have
no impact on the bottom-line position of the Resources. 
4.15. 2023/2024 Pay Award:  There were a number of entries required to manage the
Scottish Government funding of the 2023/2024 Pay Award.  These included the use
of additional General Capital Grant of £7.116 million, which had to be transferred to
the Revenue Account to pay for the increased costs experienced in year. The General
Capital Grant has been routed through the Housing Accounts and transferred to the
Revenue Account as cash balances.  This approach follows the guidance in the
Conditions of the General Capital Grant letter for 2023/2024, which allows us to use
the General Capital Grant for Revenue spend. 
4.16. A second Pay Award funding solution identified by the Scottish Government was an
underspend in Pupil Equity Funding (PEF).  The Council’s predicted underspend was
assumed as Pay Award funding at Probable Outturn, however, a year end allocation
from the Scottish Government was received and the PEF funding can now be carried
forward in the usual way.  This is included as one of the proposed Transfers to
Reserves (Appendix 4). 
4.17. Finally, the Council was asked to fund an element of the Pay Award by using Reserves
which would be replenished by further funding being allocated in 2024/2025.  The
assumed Transfer from Reserves (£1.001 million) is included in the figures quoted in
this report and will be replenished when funding is received in 2024/2025.     
4.18. These Pay Award entries have no impact on the Council’s bottom-line.  
5. Housing Revenue Account Year-End 2023/2024
5.1. As at 31 March 2024, the Housing Revenue Account (HRA) is showing a break-even
position. 
5.2. This break-even position is after a transfer to the HRA Reserve of £0.360 million. The
HRA budget initially included a Transfer from Reserves of £4.907 million, but due to
the implementation of the Loan Fund Review approved by Council in February 2024,
the Probable Outturn position anticipated a Transfer from Reserves of £0.853 million.   
5.3. Comparing the year-end Transfer to Reserves (£0.360 million) to the Probable Outturn
Transfer from Reserves (£0.853 million) means a favourable movement of £1.213
million.  This positive movement is the net result of a number of variances across the
Service area but mainly additional rental income from new build and purchased
Council housing being greater than anticipated, and a reduction in loan charges. 
These are offset by additional spend on repairs and maintenance.  
18

Page 19

5.4. The details of the variances across the HRA are shown in Appendix 5. 
5.5. As noted in section 4.14, the Scottish Government funding of the 2023/2024 Pay
Award has been routed through the Housing Revenue Account in line with the Terms
and Conditions of the General Capital Grant for this year only.  This has no impact on
the bottom-line position and reflects the accounting entries required to manage the
use of Capital funding for Revenue spend.   
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 and 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
Probable Outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact: 
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
19

Page 20

Appendix 1 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report (AFTER Transfers) 
Period Ended 31 March 2024 
Committee 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/24
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/24
After
Transfers
Variance 
Annual
Budget
To Actual
After
Transfers
Departments: £m £m £m £m  £m £m £m £m
Community and Enterprise Resources 138.189 137.949 138.189 0.000  137.522 0.667 138.189 0.000
Facilities Streets, Waste and Grounds 83.051 82.724 82.724 0.327  82.527 0.524 82.954 0.097
Fleet, Environmental and Projects 23.227 23.044 23.244 (0.017)  23.058 0.169 23.258 (0.031)
Leisure and Culture Services 5.386 5.022 5.022 0.364  4.999 0.387 4.999 0.387
Planning and Economic Development 4.883 4.574 4.574 0.309  4.521 0.362 4.521 0.362
Roads 21.642 22.585 22.625 (0.983)  22.417 (0.775) 22.457 (0.815)
Education Resources 440.131 440.426 440.426 (0.295)  439.938 0.193 440.417 (0.286)
Education Resources 440.131 440.426 440.426 (0.295)  439.938 0.193 440.417 (0.286)
Finance and Corporate Resources 47.842 48.058 48.058 (0.216)  48.007 (0.165) 48.007 (0.165)
Finance Services - Strategy 2.505 2.471 2.471 0.034  2.397 0.108 2.397 0.108
Finance Services - Transactions 21.980 22.161 22.161 (0.181)  22.078 (0.098) 22.078 (0.098)
Audit and Compliance Services 0.402 0.408 0.408 (0.006)  0.414 (0.012) 0.414 (0.012)
Information Technology Services 6.903 6.903 6.903 0.000  7.159 (0.256) 7.159 (0.256)
Communications and Strategy Services 2.955 2.955 2.955 0.000  2.920 0.035 2.920 0.035
Administration and Licensing Services 4.458 4.678 4.678 (0.220)  4.674 (0.216) 4.674 (0.216)
Personnel Services 8.639 8.482 8.482 0.157  8.365 0.274 8.365 0.274
Housing and Technical Resources 17.943 16.433 17.943 0.000  16.436 1.507 17.946 (0.003)
Housing Services 10.240 8.684 10.169 0.071  8.683 1.557 10.168 0.072
Property Services 7.703 7.749 7.774 (0.071)  7.753 (0.050) 7.778 (0.075)
Social Work Resources 237.210 237.210 237.210 0.000  237.210 0.000 237.210 0.000
Performance and Support Services 6.395 6.210 6.210 0.185  6.062 0.333 6.062 0.333
Children and Family 46.692 46.982 46.982 (0.290)  47.160 (0.468) 47.160 (0.468)
Adults and Older People 182.657 182.657 182.657 0.000  182.657 0.000 182.657 0.000
Justice and Substance Misuse 1.466 1.361 1.361 0.105  1.331 0.135 1.331 0.135
Joint Boards 2.053 2.053 2.053 0.000  2.052 0.001 2.052 0.001
Total Resources  883.368 882.129 883.879 (0.511)  881.165 2.203 883.821 (0.453) 
Annual
Budget 
Forecast
Before
Transfers 
Forecast
After
Transfers 
Annual
Forecast
Variance
(After
Transfers)   
Actual to
31/03/24
Before
Transfers
Variance 
Annual
Budget
To Actual
Before
Transfers 
Actual to
31/03/24
After
Transfers
Variance 
Annual 
Budget
To Actual
After
Transfers 
£m £m £m £m  £m £m £m £m
Total Resources  883.368 882.129 883.879 (0.511)  881.165 2.203 883.821 (0.454)
CFCR 0.577 0.577 0.577 0.000  0.577 0.000 0.577 0.000
Loan Charges 38.796 29.340 38.598 0.198  27.409 11.387 37.847 0.949
Corporate Items (7.661) (14.695) (13.712) 6.051  (14.199) 6.538 (13.064) 5.403
Investments T/F to Reserves 2.994 0.000 2.994 0.000  0.000 2.994 2.994 0.000
Transfer of 23/24 Underspend to Reserves 0.000 0.000 9.000 (9.000)  0.000 0.000 9.000 (9.000)
Total Expenditure 918.074 897.351 921.336 (3.262)  894.952 23.123 921.175 (3.100)          
Council Tax 179.102 182.394 182.394 3.292  182.361 3.259 182.361 3.259
Less: Council Tax Reduction Scheme (23.278) (23.308) (23.308) (0.030)  (23.308) (0.030) (23.308) (0.030)
Net Council Tax 155.824 159.086 159.086 3.262  159.053 3.229 159.053 3.229
General Revenue Grant 349.979 349.979 349.979 0.000  349.979 0.000 349.979 0.000
Non-Domestic Rates 341.536 341.536 341.536 0.000  341.536 0.000 341.536 0.000
Transfer from Reserves 70.735 70.735 70.735 0.000  70.735 0.000 70.735 0.000
Total Income 918.074 921.336 921.336 3.262  921.303 3.229 921.303 3.229          
Net Expenditure / (Surplus) Before
Transfers to Reserves
0.000 (23.985) 0.000 0.000  (26.351) 26.351 (0.128) 0.128 
20

Page 21

Appendix 2 
Detail of Year-End Position Across Resources and Centrally Held Budgets 
1. Movement from Last Reported Position:  The previously reported Probable Outturn
position for General Services was a break-even position after corporate Transfers to
Reserves of £9.000 million.  At financial year-end, the position is an additional
underspend of £0.128 million.  This is made up of an improvement in Resources of £0.058
million, an improvement in the centrally held budgets of Corporate Items and Loan
Charges (£0.103 million) and a decrease in the over-recovery of Council Tax / Council
Tax Reduction Scheme (£0.033 million).  Each of the individual areas of the Council’s
General Services budgets are detailed in the remainder of this Appendix.   
2. Resources and Centrally Held Budgets:  Details of the Resource positions, including
any assumptions are detailed below.  These figures include the Transfers to Reserves
approved at Probable (Appendix 3) as well as those proposed as part of the year-end
position (Appendix 4). 
3. Community and Enterprise Resources: At year-end, after Transfers to Reserves, the
Resource is showing a break-even position. This is in line with the position reported at
Probable Outturn and is after additional Transfers to Reserves of £0.427 million
(Appendix 4).     
4. Education Resources: The year-end position is an overspend of £0.286 million which
is a favourable movement of £0.009 from the position reported at Probable Outturn. This
is after further year-end Transfers to Reserves of £0.479 million (Appendix 4). 
5. Finance and Corporate Resources: The year-end position is an overspend of £0.165
million, which represents a favourable movement of £0.051 million from the position
reported at Probable Outturn (£0.216 million over). 
6. Housing and Technical Resources: At year-end, after Transfers to Reserves, the
Resource is showing a minor overspend of £0.003 million, compared to a break-even
position reported at Probable Outturn. 
7. Social Work Resources: The year-end position is break-even, in line with the Probable
Outturn.  This position includes an amount of specific funding received in relation to the
IJB that will be retained in the Council’s Balance Sheet and will be available for use by
the IJB (£1.446 million).   
8. Joint Boards: There is a minor underspend of £0.001 million within Joint Boards
(Lanarkshire Valuation Joint Board). The Probable Outturn position was break-even. 
9. Loan Charges: The year-end position is an underspend of £0.949 million, a favourable
movement of £0.751 million from the position reported at Probable Outturn. This reflects
cash balances available to invest being higher than anticipated.  There was also a slightly
higher interest rate on deposits.  There is also a benefit to the HRA. 
10. Corporate Items: The year-end position is a net underspend of £5.403 million, after
Transfers to Reserves. This position includes additional Transfers to Reserves proposed
at year end, totalling £0.152 million, as detailed in in Appendix 4. This is an adverse
movement of £0.648 million compared to Probable Outturn, as detailed in Table 2 of the
report. 
21

Page 22

11. Investments (Transfers to Reserves): After a Transfer to Reserves of £2.994 million
approved at Probable Outturn for the underspend on Front Line First – Facilities, Waste
and Grounds (£1.914 million) and Pre-School Clothing Grants (£1.080 million), there is a
break-even position on this budget line.  These transfers are included in in Appendix 3. 
12. Council Tax including Council Tax Reduction Scheme (CTRS): Council Tax is
showing an over recovery of £3.229 million, comprising an over recovery of Council Tax
of £3.259 million and an overspend on CTRS of £0.030 million.  This is a net decrease
of £0.033 million on the position reported as part of the Probable Outturn. 
13. The Council Tax over recovery of £3.259 is due to the following: 
• Empty Property charges - £0.186 million, 
• Arrears collection - £0.960 million
• Additional in-year properties - £1.872 million
• Income from Council Tax Second Homes - £0.241 million 
14. The overspend of £0.030 million on the CTRS reflects current demand for these
payments. 
22

Page 23

Appendix 3
Transfers to Reserves – Included in the Probable Outturn 
Purpose / Description Resource  Value
£m
Resources  
Investment Monies
Investment monies allocated in 2023/2024 for Community Led Investments which will now
spend in 2024/2025.  
Community and
Enterprise
0.200
Fleet Sinking Fund
Annual contribution to the Fleet sinking fund to maintain asset replacement programme.
Community and
Enterprise
0.025
Year 3 of Electric Vehicle Payback
Ringfenced reserves used to manage purchase of electric vehicles in short term which have to
be repaid over the next few years.
Community and
Enterprise
0.015
Total Community and Enterprise Resources   0.240
Ukraine Resettlement Funding
This funding forms part of the 2023/2024 revenue grant redeterminations and will be carried
forward for use in 2024/2025.
Housing and Technical 1.485
Local Heat and Energy Efficiency Strategies (LHEES) Funding
It is proposed that this external funding is carried forward to be utilised in 2024/2025.
Housing and Technical 0.025
Total Housing and Technical Resources  1.510
Total Resource Transfers to Reserves  1.750   
Loan Charges 
Loan Charges Underspend
Underspend to be set aside to manage future overspends predicted in Loan Charges as
previously advised to members (Council, 18 January 2023).
Loan Charges 3.758
Loan Charges Underspend
Underspend from Deposit Interest and Transformation Fund borrowing to be set aside as
included in the 2024/2025 Budget Strategy.  (Executive Committee, 22 November 2023).
Loan Charges 5.500
Total Loan Charges Transfers to Reserves   9.258   
Corporate Items  
Service Concessions
Underspend on Loan Charges used manage anticipated overspends in future years.
Corporate Items 0.437
Insurance Fund
The Insurance Fund will require additional budget into 2024/2025.
Corporate Items 0.300
Central Energy Efficiency Fund (CEEF)
Resources are allocated funding from the CEEF Reserve to pay for spend to save projects
which they repay over future years from the revenue savings generated by the project. This
transfer represents the payback of savings from Resources and allows the Reserve to be
regenerated for use on future projects.
Corporate Items 0.246
Total Corporate Items Transfers to Reserves   0.983   
Investments 2023/24  
Front Line First – Facilities, Waste and Grounds
From the total investment of £3 million, £1.086 million has been retained for spend in
2023/2024 with the remaining £1.914 million to be transferred to reserves for use in future
years.  The £1.914 million has been moved to the budget line 2023/2024 Investments –
Transfers to Reserves and will be transferred to Reserves at the year-end.
Investments 2023/24 (T/f
to Reserves)
1.914
Pre-School Clothing Grants
From the total investment of £1.350 million, an amount of £0.270 million has been retained for
spend in 2023/2024 with the remaining £1.080 million to be transferred to reserves for use in
the next 4 years.  The £1.080 million has been moved to the budget line 2023/2024
Investments – Transfers to Reserves and will be transferred to Reserves at the year-end.
Investments 2023/24 (T/f
to Reserves)
1.080
Total Investments 2023/24 Transfer to Reserves  2.994   
Additional Transfers to Reserves – Use of Probable Outturn Underspend  
Budget Pressures
It is proposed that £3.000 million be transferred to reserves and be used to fund Budget
pressures into 2024/2025.  This proposal is to use this temporary funding to manage the timing
of when permanent budget solutions are identified / delivered.  
Use of Probable Outturn
Underspend
3.000
Contribution to Budget Strategy
In addition, it is proposed that £6.000 million be transferred to reserves.  These monies could
be used in the Council’s Budget Strategy, bearing in mind the previously identified savings
requirement of £95.8 million across the 4 years from 2024/2025.   
Use of Probable Outturn
Underspend
6.000
Total Additional Transfers to Reserves – Use of Probable Outturn Underspend  9.000   
Total Transfers to Reserves Approved at Probable Outturn  23.985 
23

Page 24

Appendix 4
Transfers to Reserves – Additional Proposed Transfers at Year-End 
Purpose / Description Resource  Value
£m
Resources
Chatelherault Play Park
A planned contribution to support the delivery of the upgrade to Chatelherault Play Park as
part of the overall Capital project on play park improvement and the Chatelherault Masterplan. 
Due to timing, this project will complete in 2024/2025.   
Community & Enterprise 0.137
IT Modernisation
Funding carried forward will be used in the development of a new Bereavement management
system, linked to the long-term Bereavement strategy; to upgrade the CONFIRM system
within Grounds; and for the introduction of handheld devices for staff.  Due to timing, this
project will complete in 2024/2025.   
Community & Enterprise 0.290
Total Community and Enterprise Resources  0.427
Pupil Equity Fund
The funding received from the Government can be used up to the end of the school term
(June 2024). The underspend reflects the element of the funding that will be utilised in April to
June 2024.
Education 0.323
School Support Assistant Training
Funding was provided by the Scottish Government in February 2024 to support the training of
support staff in schools, following the findings of the Behaviour in Scottish Schools Research
(2023).  Funding carried forward to 2024/2025 will allow training plans to be developed.  
Education 0.057
ELC Footwear and Clothing Grant
Balance of Investment monies for the provision of Footwear & Clothing Grants to pre-school
children (Early Years) in 2023/2024 to be carried forward. This underspend reflects the level of
demand for Grants during the year and will be redirected to 2024/205 investments, as per the
Budget Amendment approved in February 2024.  
Education 0.099
Total Education Resources 0.479
Total Resource Proposed Transfers to Reserves at Year-End  0.906   
Loan Charges  
Interest on Revenue Balances transferred to Fund reserves. Loan Charges 1.180
Total Loan Charges Proposed Transfers to Reserves   1.180   
Corporate Items  
Renewable Heat Incentive (RHI) and Feed In Tariff (FIT)
Income from RHI and FIT is received in-year and will be set aside for funding future capital
spend.
Corporate Items 0.152
Total Corporate Items Proposed Transfers to Reserves at Year-End  0.152   
Total Proposed Transfers to Reserves at Year-End (Excluding Year-End Underspend)  2.238   
Additional Transfers to Reserves – Use of Year-End Underspend  
Future Budget Strategies
It is proposed that the outturn underspend of £0.128 million be transferred to Reserves for use
in future Budget Strategies, including pay award requirements.
Use of Year-End
Underspend
0.128
Total Additional Transfers to Reserves – Use of Year-End Underspend  0.128   
Total Proposed Transfers to Reserves at Year-End (Including Year-End Underspend)  2.366 
24

Page 25

Appendix 5 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 31 March 2024 (No.15) 
Housing Revenue Account 
Annual
Budget
Forecast
for Year 
Annual
Forecast
Variance 
Budget
Proportion
31/03/24
Actual 
31/03/24
Variance
31/03/24 
% Variance
31/03/24 Notes            
Budget Category           
Employee Costs 15.310  15.401  (0.091) 15.310  15.369  (0.059)  over (0.4%) 
Property Costs 49.282  54.963  (5.681) 49.282  55.322  (6.040) over (12.3%) 1
Supplies & Services 0.653  0.691  (0.038) 0.653  0.949  (0.296) over (45.3%) 
Transport & Plant 0.196  0.189  0.007  0.196  0.173  0.023  under 11.7% 
Administration Costs 5.570  5.597  (0.027) 5.570  5.663  (0.093) over (1.7%) 
Payments to Other Bodies 3.121  3.126  (0.005) 3.121  10.265  (7.144) over (228.9%) 2
Payments to Contractors 0.100  0.145  (0.045) 0.100  0.147  (0.047) over (47.0%) 
Transfer Payments 0.000  0.000  0.000  0.000  0.000  0.000  - 0.0% 
Financing Charges 27.229  27.229  0.000  27.229  20.178  7.051  under 25.9% 3
Total Controllable Exp. 101.461  107.341  (5.880) 101.461  108.066  (6.605) over (6.5%) 
Total Controllable Inc. (114.440) (115.268) 0.828  (114.440) (116.578) 2.138  over
recovered 1.9% 4
Transfer to/(from) Balance
Sheet (4.907) (0.853) (4.054)  (4.907) 0.360 (5.267)  under
recovered (107.3%) 5
Net Controllable Exp. (17.886) (8.780) (9.107) (17.886) (8.152) (9.734) over (54.4%) 
Loan Charges 17.886  8.780  9.107  17.886  8.152  9.734  under (54.4%) 6
Net Controllable Exp. 0.000  0.000  0.000  0.000  0.000  0.000  - 0.0% 
Variance Explanations 
1. Property Costs:  The overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. 
2. Payments to Other Bodies:  The overspend reflects the release of HRA surplus to the General Fund in line with the General Capital Grant conditions where the
funding for the pay award was to be routed through the Housing Accounts.  The offset is an underspend in Capital Financed from Current Revenue (see 3 below). 
This has no impact bottom line.
3. Financing Charges: The underspend offsets the overspend in Payments to Other Bodies (see 2 above). 
4. Income:  The additional income is due to the favourable timing of new build and purchased Council housing units being available to rent, and greater than budgeted
insurance income.
5. Transfers to/from Reserves: The year end position is a Transfer to Reserves, rather than the budgeted Transfer from Reserves.  This positive movement is the
net result of a number of variances across the Service area but mainly additional rental income from new build and purchased Council housing being greater than
anticipated, and a reduction in loan charges.  These are offset by additional spend on repairs and maintenance.  
6. Loan Charges: The underspend is due to the utilisation of an in-year benefit from the Housing Revenue Account Loans Fund Review. 
Virements
None. 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 2 - 1 April 2024
to 17 May 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the forecast for the year to 31 March 2025 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2024 to 17 May 2024
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2024/2025, and the actual spend as at 17 May 2024 (section 4 and Appendix
1), be noted; 
(2) that the additional £3.710 million UK Government Consequentials be set aside
as a contingency for higher than budgeted pay claims in 2024/2025 (sections
4.15 to 4.17), be approved; and
(3) that the projected break-even position on the Housing Revenue Account for
2024/2025, and the actual spend as at 17 May 2024 (section 5 and Appendix 2
of the report), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2024/2025 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section 5). 
It will also provide the actual spend as at 17 May 2024. 
3.2. The Council has adopted a new Financial Management System, Oracle Fusion, which
integrates a number of business processes, including HR and Procurement/Payables
data. In a financial management context, this will allow us to forecast budget
information, and therefore means a change in format in relation to the reports provided
to the Executive Committee. This is reflected in the monitoring statements in
Appendices A and B. 
4. General Services 2024/2025 Projected Outturn as at 17 May 2024
4.1. As at 17 May 2024, the projected outturn position for 2024/2025 on the General
Services budget is break-even (Appendix 1).   
4.2. Section 4.3 onwards provides detail on a number of key budget areas.    
4
27

Page 28

4.3. 2024/2025 Investments - Transfer to Reserves:  The investment monies for
2024/2025 included an amount of £0.500 million for the Central Energy Efficiency
Fund, and £0.150 million for the Net Zero Innovation Fund. As part of the budget
setting process for 2024/2025, these monies were allocated Corporately, pending
allocation to Housing and Technical Resources. However, the Resource has now
profiled these investments, with spend expected to occur beyond the current financial
year. Budget of £0.250 million for the Central Energy Efficiency Fund and £0.075
million for the Net Zero Innovation Fund (total £0.325 million) has therefore been
moved to the budget line 2024/2025 Investments – Transfers to Reserves (Appendix
1). 
4.4. Teacher Numbers:  As teacher numbers were maintained as part of the census
exercise, there was no impact on the grant funding and the £2.934 million initially
held back by the Scottish Government was eventually received in 2023/2024. 
4.5. In relation to 2024/2025, the Council has now received notification that the allocation
of funding for teacher numbers of £145.5 million for 2024/2025 will be distributed via
Specific Resource Grants, and those grants will be conditional on councils agreeing
at the outset to maintain teacher numbers.  It has been made clear by the Scottish
Government that if we do not sign the letter, then no payments will be made to
councils, and we will not receive our share of the £145.5 million funding (£9.379
million).  Scottish government have indicated that they will consider mitigations
presented by councils for reducing teacher numbers due to council’s pupil roll and
with regard to the Scottish Attainment Challenge Funding for Challenge Authorities
(SLC was not a Challenge Authority), but that we will not know if mitigation will be
acceptable until much later in the year.   
4.6. Additionally, Scottish Government have indicated that any reduction in funding will be
proportionate for the actual number of teachers reduced against the baseline, rather
than losing the full amount.  Discussions are ongoing with all local authorities,
COSLA and the Scottish Government in terms of the impact of this position at this
time.  Revised grant letters have been issued for each authority however whilst the
grant letter has not yet been signed, a letter has been sent to the Scottish
Government outlining the projected 2024/2025 teacher numbers position as it is
expected that the teacher numbers will not be maintained at the same level as
2023/2024. 
4.7. This is due to two main areas.  The first is a reduction in teacher numbers due to the
end of the Council investment in Early Level Teachers, around 46 FTE, which were
recruited for a two-year fixed term period from August 2022.  These posts were
funded using temporary council funding to support early years transition to primary
school following the pandemic, and this staffing was in place prior to the 2022
census and the teacher numbers commitment. These temporary arrangements have
now ended as the temporary funding has been used and therefore our teacher
numbers will reduce.  Secondly, there is a national reduction in Newly Qualified
Teachers (NQTs) compared to last year which has a current impact of 28 FTE less
NQTs available for the Council.  These issues were raised repeatedly during 2023,
and councils were told that they would get a view on this post the 2023 census
exercise, however no clarity was received.  This remains the same position for 2024
with assessment of mitigations being pushed back until after the teachers census
data is published in December 2024. 
28

Page 29

4.8. Normal practice would dictate that we reduce our teaching establishment in line with
falling pupil rolls.  In turn, in normal circumstances, for 2024/2025 this would lead to
us reducing teacher numbers.  At present, given the concerns around losing funding
if we reduce teacher numbers, we are not proposing to do that.  Senior officers are
engaging with the Scottish Government on these areas and further updates will be
provided in due course. 
4.9. Employers Pension Contribution Increase (Teachers):  As of 1 April 2024, the
Council’s pension contribution for Teachers’ Pensions was increased from 23% to
26% of basic pay.  The cost to the Council is an estimated £5.5 million however, the
Council has not yet been notified of funding to support this increase.  That said, the
Scottish Government expect to receive funding for this from the UK Government and
have committed to passing this on to councils.   
4.10. Employers Pension Contribution Reduction (Non-Teachers):  In November
2023, the Executive Committee approved the reduction in Employer Contribution
rates (from 19.3% to 6.5%) for use in the Budget Strategy. A temporary saving of
£22.600 million was expected to be realised in 2024/2025. This has now been
revised to £22.965 million.  This excludes any saving in Pension Contributions for the
budget delegated to the IJB (refer section 4.12). 
4.11. The predicted underspend in Resource budgets (£22.965 million) has been
transferred to the Employer Contribution - Transfers to Reserves line, for use in line
with the Strategy.  These transfers are reflected in Appendix 1.  This will continue to
be monitored to identify any further underspends and Members will be advised
accordingly.   
4.12. Children and Families:  As reported through Social Work Resources Committee,
budget pressures within Children and Families are continuing into 2024/2025 in
relation to statutory duties of continuing care and increased costs and requirements
for residential placements, fostering and kinship care. 
4.13. As an interim solution, while further options are being progressed to bring spend in
line with budget, it was noted in the 2024/2025 Budget report to Council (21
February 2024) that £7.7 million of unrequired budget as a result of reduced pension
contributions (refer section 4.9), has been re-directed to Children and Families
Services from the delegated IJB budget (Adult and Older People Services). In
addition, £2.3 million of one-off central funding carried forward from 2023/2024, is
available to support these residual pressures in 2024/2025.   
4.14. The Social Work Resources position as at 17 May 2024 assumes the funding is
available and will be drawn down later in the financial year, as required. 
4.15. UK Government Consequentials:  As noted previously (Council, 27 March 2024),
correspondence from the Scottish Government, advised that following the Spring
Budget, the UK Government identified £48 million of funding for Scottish Local
Government and that they would pass that funding through to councils. The
correspondence also stated that the Scottish Government will make the decisions in
year which are necessary to top that up to the £62.7 million, for those who have
agreed to freeze their Council Tax.  On 3 May 2024, the Council was formally
advised of its share of these monies which total £3.710 million.    
29

Page 30

4.16. As advised through previous Budget reports to Council (21 February 2024), recent
pay claims presented have identified a risk that any pay deal for 2024/2025 will
exceed the pay funding that has been included in the Council’s Budget Strategy. In
the 2024/2025 Budget update report to Council on 27 March 2024, following receipt
of the Local Government Finance (Scotland) Order 2024, it was suggested that “it
would be prudent, when an allocation is made, that members consider holding this
as a contingency against higher than budgeted costs of pay”.   
4.17. Recent correspondence from the Deputy First Minister (DFM) reiterated the
Government’s commitment to achieving a fair and affordable outcome of negotiations
for Scotland’s public sector workforce, but also set out the “the challenging fiscal
outlook” faced by the Scottish Government.  In short, it gives no indication of further
funding to support pay claims therefore it is proposed that the additional £3.710
million be set aside as a contingency for higher than budgeted pay claims in
2024/2025 (see section 2.1, recommendation 2). 
4.18. Transfer of Employability Service to Community and Enterprise Resources: 
The Council’s Employability Service has operationally transferred to Community &
Enterprise Resources from Finance & Corporate Resources and Education
Resources, following approval in March 2024.  The budgets in Appendix 1 reflect
these transfers. 
4.19. School Meal Debt:  A national School Meal debt fund of £1.500 million was
announced by the First Minister in May 2024 to support Local Authorities to cancel
School Meal debt. Local Authorities will have the opportunity to bid for one-off
funding based on their decision to write off debt at a local level. Funding is available
to support retrospective debt prior to April 2024 and applications are to be submitted
by 1 August 2024.  Officers are considering a bid submission, and Members will be
updated on the bid and its outcome later in the year. 
4.20. Loan Charges:  As previously reported to the Executive Committee (22 November
2023), there is a budgeted underspend of £2.000 million in Loan Charges in
2024/2025 due to greater than budgeted deposit interest.  This underspend is part of
the £6.000 million corporate solution approved by the Committee where £2.000
million would be used each year from 2024/2025 to 2026/2027 to reduce the budget
gap.  The £2.000 million underspend has been used as planned in 2024/2025.   
4.21. Loans Fund Review:  The proposal to implement a Loans Fund Review was part of
the Revenue Budget Strategy paper presented to Executive Committee on 24 June
2020.  The Committee agreed to implement the Loans Fund Review and noted that
the benefit each year will be realised through an underspend in Loan Charges which
would be taken to Reserves for use in future years budget strategies.  Through the
changes introduced as part of the Loans Fund Review, the Loan Charges
underspend in 2024/2025 is £14.309 million in 2024/2025 and this will be used in the
Budget Strategy as planned.   
5. Housing Revenue Account Position
5.1. As at 17 May 2024, Appendix 2 of the report shows a break-even position on the
Housing Revenue Account. 
6. Employee Implications
6.1. None.  
30

Page 31

7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four weekly
Budget Monitoring Meetings at which any variance is analysed. In addition, the
probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in this
report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 17 May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
31

Page 32

Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 124.139 124.139 0.000 0.00% 12.810
Facilities Waste and Grounds 75.527 75.332 0.195 0.26% 5.955
Leisure and Culture 21.738 21.738 0.000 0.00% 3.921
Planning and Regulatory Services 4.540 4.496 0.044 0.97% 0.292
Enterprise and Sustainable Development 5.672 5.662 0.010 0.18% 0.466
Roads, Transportation and Fleet 16.662 16.911 (0.249) (1.49%) 2.176
Education Resources 451.422 451.422 0.000 0.00% 49.142
Education 451.422 451.422 0.000 0.00% 49.142
Finance and Corporate Resources 37.821 37.821 0.000 0.00% 9.855
Finance Services - Strategy 1.858 1.858 0.000 0.00% 0.295
Finance Services - Transactions 16.922 16.922 0.000 0.00% 4.078
Audit and Compliance Services 0.320 0.320 0.000 0.00% 0.062
Information Technology Services 5.904 5.904 0.000 0.00% 2.503
Communications and Strategy Services 2.386 2.386 0.000 0.00% 0.123
Administration and Licensing Services 4.075 4.075 0.000 0.00% 2.338
Personnel Services 6.356 6.356 0.000 0.00% 0.456
Housing & Technical Resources 13.302 13.302 0.000 0.00% 5.958
Housing Services 8.434 8.384 0.050 0.59% 0.739
Property Services 4.868 4.918 (0.050) (1.03%) 5.219
Social Work Resources 234.191 234.191 0.000 0.00% 27.459
Performance and Support Services 6.092 6.092 0.000 0.00% 0.528
Children and Families 46.653 46.653 0.000 0.00% 5.397
Adults and Older People 180.637 180.637 0.000 0.00% 21.575
Justice and Substance Misuse 0.809 0.809 0.000 0.00% (0.041)
Joint Boards 1.902 1.902 0.000 0.00% 0.293
862.777 862.777 0.000 0.00% 105.517
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 862.777 862.777 0.000 0.00% 105.517
CFCR 0.000 0.000 0.000 0.000
Loan Charges 39.589 39.589 0.000 0.00% 0.000
Corporate Items 20.538 20.538 0.000 0.00% 0.287
Employers Contribution - T/f to Reserves 22.965 22.965 0.000 0.00% 0.000
Investments - 23-24 T/f to Reserves 0.325 0.325 0.000 0.00% 0.000
Total Expenditure 946.194 946.194 0.000 0.00% 105.804
Council Tax 181.587 181.587 0.000 0.00% 27.936
Less: Council Tax Reduction Scheme (23.544) (23.544) 0.000 0.00% (3.622)
158.043 158.043 0.000 0.00% 24.314
General Revenue Grant 385.417 385.417 0.000 0.00% 59.295
Non Domestic Rates 364.911 364.911 0.000 0.00% 56.140
Transfer from Reserves 37.823 37.823 0.000 0.00% 0.000
Total Income 946.194 946.194 0.000 0.00% 139.749
Net Expenditure 0.000 0.000 0.000 (33.945)
Period Ended 17 May 2024 (No.2)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
32

Page 33

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 13.780 13.780 0.000 0.00% 1.523
Property Costs 59.201 59.201 0.000 0.00% 2.906
Supplies and Services 1.545 1.545 0.000 0.00% 0.034
Transport and Plant 0.196 0.196 0.000 0.00% 0.009
Administration 5.595 5.595 0.000 0.00% 0.059
Payment to Other Bodies 2.974 2.974 0.000 0.00% 0.379
Payment to Contractors 0.100 0.100 0.000 0.00% 0.010
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 33.573 33.573 0.000 0.00% 5.156
Total Controllable Exp. 116.964 116.964 0.000 0.00% 10.076
Total Controllable Inc. (123.396) (123.396) 0.000 0.00% (11.530)
Transfer to/(from) Balance Sheet (4.229) (4.229) 0.000 0.00% (0.197)
Net Controllable Exp. (10.661) (10.661) 0.000 0.00% (1.651)
Loan Charges 10.661 10.661 0.000 0.00% 1.651
Net Controllable Exp. 0.000 0.000 0.000 0.00% 0.000
Variance Explanations
No significant variances.
Virements
None.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 17 May 2024 (No.2)
Housing Revenue Account
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget Monitoring Final Outturn – 2023/2024 
1.  Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the outturn position of the General Services and Housing
Capital Programmes for the year ended 31 March 2024
 advise of the projects expressed in financial terms, which have been carried
forward into year 2024/2025 
2.  Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendations:-
[recs]
(1) that the outturn on the 2023/2024 General Services Programme of £64.244
million (section 5.1), be noted; 
(2) that the £14.121 million of General Services Capital Programme be carried
forward into 2024/2025 (section 5.9), be approved; 
(3) that the outturn on the 2023/2024 Housing Capital Programme of £62.240
million (section 5.11), be noted;  
(4) that the £5.203 million of Housing Capital Programme be carried forward into
future years’ (section 5.12), be approved; and
(5) that the level of overall spend anticipated in 2024/2025, for both the General
Services and Housing Capital Programmes is the subject of a separate report
to this Committee (sections 5.10 and 5.14), be noted. 
3. Background
3.1. The General Services Capital Programme for 2023/2024 totalled £78.365 million.  This
revised programme consists of the base budget plus carry forward projects and
adjustments which have been agreed by the Executive Committee up to and including
its meeting on 8 May 2024.   
3.2. The Housing Capital Programme for 2023/2024 totalled £67.443 million.  This was
approved by the Executive Committee on 8 May 2024.   
3.3. Section 4 of this report will provide a final outturn position on the 2023/2024 General
Services and Housing Capital Programmes and will update members on the carry
forward into the new financial year. 
4. Employee Implications 
4.1. There are no employee implications as a result of this report. 
5
35

Page 36

5. Financial Implications
5.1. General Services:  Appendix 1 shows the total expenditure of £64.244 million on the
General Fund Capital Programme for year 2023/2024.  This is compared to the budget
of £78.365 million and results in an underspend of £14.121 million.  This underspend
relates to projects within Community and Enterprise Resources (£11.241m), Finance
and Corporate Resources (£0.684m) and Housing and Technical Resources
(£3.771m) with greater spend than anticipated achieved within Education Resources
(£1.257m) and Social Work Resources (£0.318m). 
5.2. Overall, the programme underspend reflects the timing of spend across financial
years. The main projects responsible for the overall programme underspend of
£14.121 million are detailed in Appendix 2.  This appendix provides a list of the
continuing projects into 2024/2025, along with their estimated completion dates. 
5.3. These underspends have been partially offset by a few projects where there have
been budget overspends this financial year.  For these projects, again, this is primarily
a timing issue only with funding for the overall spend already identified into the next
financial year.  This will be included as part of the update on the 2024/2025 Capital
Programme, which is also being reported to this Committee.   
5.4. Year End and Accounting Adjustments:  Accounting Regulations mean that
adjustments are required to report spend correctly as either Capital or Revenue for the
purposes of publishing our Annual Accounts.  This includes where spend from the
Capital Programme is on assets that are not owned by the Council (for example
Shawfield Industrial Estate spend) or where spend must be classed as Revenue due
to the nature of the spend.  This adjustment has no physical impact on projects – it is
an accounting entry only. 
5.5. From reviewing the Council’s Revenue and Capital spend, £6.311 million of capital
spend is required to be recorded as Revenue spend. 
5.6. Conversely, £0.161 million of revenue spend should be recorded as Capital. These
transfers mean that for the purpose of publishing our Annual Accounts only, there is
capital spend of £58.094 million.  The funding sources for this spend are detailed in
Appendix 1. 
5.7. 2023/2024 Pay Award:  As advised to members previously (22 February 2023), part
of the Council’s Capital funding package for the year included £7.116 million which
was allocated by the Scottish Government to fund the 2023/2024 Pay Award.  In order
to facilitate this, the General Capital Grant has been routed through the Housing
Accounts with a subsequent transfer to the General Services Revenue Account.  This
is permitted in the Grant Conditions of the General Capital Grant letter for 2023/2024
which the Scottish Government have changed for this year only, and which allows
councils to use the General Capital Grant for Revenue spend. 
5.8. The figures presented in the Housing Capital Outturn in Appendix 3 reflect the transfer
of General Capital Grant and the reduced use of CFCR to facilitate the funding
ultimately being transferred to the General Services Revenue account to pay for the
Pay Award.  This has no impact bottom-line and is just the accounting arrangements
required for routing the monies to the General Services Revenue account. 
36

Page 37

5.9. Carry Forward to 2024/2025:  As noted in 5.2, the year-end underspend is £14.121
million.  This £14.121 million will carry forward into financial year 2024/2025. 
5.10. The overall base programme for 2024/2025 including this carry forward of £14.121
million will be included in a further report to this Committee.  This separate report will
propose the programme for the coming year by focussing on the overall level of spend
achievable. 
5.11. Housing Programme:  Appendix 3 shows the budget for the year of £67.443 million. 
The actual expenditure on the Housing programme was £62.240 million, a net
underspend of £5.203 million.  This is due to the timing of the purchase of land at sites
within the East Kilbride Community Growth Area and Brackenhill Farm, Hamilton, with
these settling early in the new financial year.  In addition, there were access issues
with a significant number of central heating systems upgrades and windows and doors
projects. 
5.12. Carry Forward to 2024/2025:  Taking into account the year-end underspend position,
means a carry forward of £5.203 million which will fall into future financial years.
Further analysis of this budget confirms that £3.418 million is required in 2024/2025,
with the remainder being carried forward into future years. 
5.13. In addition, the Scottish Government’s Affordable Housing grant for 2024/2025 has
now been confirmed. For South Lanarkshire, this will result in a reduction of £3.473
million in the 2024/2025 approved programme.   
5.14.   The approved Capital Programme for 2024/2025 was £77.303 million (South
Lanarkshire Council, 21 February 2024).  As a result of the adjustments noted at
Sections 5.12 and 5.13, a revised programme for 2024/2025 of £77.248 million is
presented to this Committee for approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1 This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
5 June 2024  
37

Page 38

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 21 February 2024
 Executive Committee, 8 May 2024 
List of Background Papers
 Capital Ledger prints to 31 March 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy) 
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk     
38

Page 39

APPENDIX 1
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Expenditure
2023/2024
Revised
Budget
2023/2024
Actual to
31/03/24  
£m £m   
General Fund Programme (Section 5.1) 78.365 64.244
Accounting Adjustments (Sections 5.4 and 5.5):     
Less:  Transfers to Revenue  (6.311)   
Add:  Year End Transfers to Capital  0.161   
2023/2024 Outturn Position (Accounting Basis only) 78.365 58.094   
Income 
2023/2024
Actual to
31/03/24  
£m
Prudential Borrowing  18.919
Developer Contributions  3.071
Partners (Including SPT, REF, Clyde Wind Farm and Energy
Saving Trust) 
2.966
Scottish Government:   
- Capital Grant (excl. £7.116m transferred to HRA)  22.900 
- Cycling, Walking and Safer Routes  2.283 
- Vacant and Derelict Land  0.032 
- Regeneration Capital Grant   - 
- Place Based Investment Programme  1.536 
- Inspiring Spaces  0.223 
- Road Safety Improvement Fun  0.440
Glasgow City Region City Deal  3.995
Specific Reserves  1.153
Revenue Contribution  0.576   
TOTAL FUNDING  58.094              
39

Page 40

APPENDIX 2
(Page 1) 
SOUTH LANARKSHIRE COUNCIL      
CAPITAL EXPENDITURE 2023/2024       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Projects with Underspends in 2023/2024 
which will Carry Forward into 2024/2025
Project Name Project Type Completion Date     
Community and Enterprise Resources  
SLLC – Booking and Admission System IT Infrastructure March 2025
Phillipshill Cemetery – Extension Infrastructure  June 2024
Ash Die Back Woodland
Management
September 2024 
Langlands Boardwalk Infrastructure January 2025
Bin Storage Areas Infrastructure September 2024
Play Parks – Larkhall, Rutherglen and
Cambuslang Areas
Infrastructure October 2024
Nature Restoration Fund Woodland
Management
July 2025
Greenhall Replacement Bridge – Design  Infrastructure June 2025
White Bridge Replacement, Chatelherault
Country Park – Design 
Infrastructure June 2024
Larkhall Leisure Centre – Design New Build March 2025
Former Ballgreen Hall Demolition Demolition June 2024
TACT Hall - Heating Replacement Refurbishment June 2024
Priory Changing Pavilion, Blantyre Refurbishment March 2025
Calderglen Country Park – One Way System &
Infrastructure
Infrastructure July 2024
Rural Development Centre – Lanark Racecourse Regeneration November 2024
2023/2024 Place Based Investment Fund –
Various 
Regeneration September 2024
SLC Industrial Infrastructure - Energy Efficiency Regeneration June 2025
Carnwath Community and Business Enterprise
HUB
Regeneration March 2025
Carluke High Mill Community Facility Regeneration March 2026
Vacant & Derelict Land – Cuningar Allotments Regeneration September 2024 
Vacant & Derelict Land – Clyde Cycle Park
Phase 2
Regeneration August 2024
City Deal Community Growth Areas – Woodfoot
Road / Wellhall Road, Hamilton
Infrastructure March 2025
City Deal – Calderside Academy Adaptations Autumn 2026
City Deal – Holy Cross High Adaptations Autumn 2026
City Deal – Lanark Road Signalisation Infrastructure August 2024
City Deal – Cathkin Bypass – Grant Payments
Only
Grants Throughout 2024/25 
40

Page 41

APPENDIX 2
(Page 2)
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
Projects with Underspends in 2023/2024 
which will Carry Forward into 2024/2025
Project Name Project Type Completion Date
Community and Enterprise Resources (Cont)  
City Deal – Greenhills Road - Landscaping etc Infrastructure August 2024
Roads Investment Programme - Clydesdale Infrastructure December 2024
Roads Structures Infrastructure August 2024
Footpaths and Roads Improvement Fund Infrastructure December 2024
Cycle Shelters at Schools Infrastructure September 2024
Lanark Interchange Infrastructure Ongoing discussions 
on funding
Electric Vehicle Expansion Infrastructure March 2025
Switched on Fleet Infrastructure March 2025
National Strategy for 20mph Infrastructure March 2025 
Education Resources  
Woodside Primary School - Adaptations Adaptations August 2024
Uddingston Nursery Expansion Adaptations August 2024
Crawforddyke Primary School - Toilet Adaptations Adaptations April 2024
Stonelaw High School - Adaptations Adaptations Summer 2024
Wooddean Early Learning Centre (formerly Clyde
Terrace Nursery)  
New Build April 2024
First Steps Community Nursery Extension June 2024
Free School Meals Expansion Adaptations Throughout 2024/25
and beyond
Secondary Schools – St. Andrews and St. Brides Adaptations Throughout 2024/25
and beyond
Schools ICT Infrastructure Throughout 2024/25
and beyond   
Finance and Corporate Resources  
IT Infrastructure Refresh Infrastructure Throughout 2024/2025
Oracle Fusion Infrastructure August 2024   
Housing and Technical Resources   
Prioritised Urgent Investment Refurbishment Throughout 2024/25
Lifecycle Replacement Schools Refurbishment Throughout 2024/25
Communities Facilities Fund Refurbishment Throughout 2024/25
Council Offices – Brandon Gate  Adaptations April 2024
CEEF Programme Refurbishment June 2024
Public Space CCTV – Phase 2 Infrastructure March 2025   
Social Work Resources  
SWIS Plus Replacement IT
Infrastructure
October 2024 
41

Page 42

APPENDIX 3
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/2024
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 31 MARCH 2024 
2023/2024
Annual Budget   
2023/2024
Actual to
31/03/24 
£m  £m
EXPENDITURE   
2023/2024 Budget 
Incl. carry forward from 2023/24
67.443  62.240 
2023/2024
Actual to
31/03/24  
£m
INCOME     
Capital Receipts  1.901
Capital Receipts – Land Sales  0.065
Capital Funded from Current Revenue (after transfer to General Services Revenue)  20.046
Prudential Borrowing  14.533
General Capital Grant (being the transfer from General Services Capital)  7.116
Scottish Government Specific Grant:
– New Build   9.228
– Open Market Purchase Scheme  8.563
– Mortgage to Rent  0.288
Miscellaneous Income  0.500
TOTAL FUNDING  62.240 
42

Page 43

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2024/2025 and Monitoring for Period 2 -
1 April 2024 to 17 May 2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 consolidate the capital budget monitoring to give a Council-wide summary of the
2024/2025 Capital Programme including 2023/2024 carry forward.  It includes
information on two programmes:  the General Fund Programme (being
Education, Social Work, Roads and Other General Services) and the Housing
Investment Programme, which covers all investment in relation to the Council’s
Housing stock
 update Committee of progress on the Capital Programme for the period 1 April
2024 to 17 May 2024  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-  
(1) that the position of the General Fund Capital Programme detailed in (section 4)
and the Housing Capital Programme (section 5), be approved; 
(2) that the Council borrows £2 million, on a short-term basis, to fund the balance
of the Hairmyres Station Park and Ride project spend, as detailed in Section
4.10, be agreed; 
(3) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; and
(4) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. South Lanarkshire Council (21 February 2024) approved a General Services base
budget of £49.512 million for financial year 2024/2025.  Since the approval of this
programme, the financial year-end and additional funding received will mean an
adjustment to the 2024/2025 Capital Programme set. 
3.2. A total Housing Capital Programme budget for 2024/2025 was also approved by
Council in February 2024.  This included funding carried forward from previous years
and gave a total programme of £77.303 million.  
6
43

Page 44

3.3. This report provides an update on the Capital programmes as well as a summarised
monitoring position as at 17 May 2024 (Period 2).  Spending has been split into two
separate sections below: 
 General Fund Capital Programme (which includes Education, Social Work, Roads
and Other General Services) (Section 4)
 Housing Capital Programme (Section 5) 
4. 2024/2025 Capital Programmes
4.1. General Services – 2024/2025 Budget: Section 3.1 notes that the base programme
for General Services is £49.512 million, as approved by Council in February 2024. 
This base budget is affected by the adjustments detailed in sections 4.2 to 4.10 and
summarised in Table 1. 
4.2. 2023/24 Carry Forward:  As reported in the Final Outturn Report for 2023/2024, a
separate report to this meeting, a carry forward total of £14.121 million will ensure
sufficient budget is available to conclude ongoing projects within the General Fund
Capital Programme.
Increase to Budget:  £14.121 million 
4.3. Net Additional Funding (2023/2024):  At the end of 2023/2024, additional funding
was received and used to fund expenditure incurred in that year.  This has been
offset by budget reductions – where externally funded projects have completed
under budget, or funding is unable to be carried forward e.g. SPT funded projects
such as Lanark Interchange.  The net total of this income is an increase to the
programme of £0.217 million and this needs to be added to the overall expenditure
budget being carried into 2024/2025.  
Increase to Budget:  £0.217 million 
4.4. Previous Approvals:  The Finance and Corporate Resources Committee, at its
meeting on the 1 September 2021, approved funding of £1 million from Reserves
towards the Oracle HR/Finance Replacement project.  The spend profile means that
this will be required in financial year 2024/2025.  
Increase to Budget: £1.000 million 
4.5. Leisure and Culture Transformation Fund:  As part of the 2023/2024 Revenue
Budget, members approved an allocation of £1.182 million to pay for the cost of
borrowing £13 million of capital investment for a Leisure and Culture Transformation
Fund.  The fund will help modernise the leisure and culture estate, optimise use of
assets and assist in the transition towards net zero. 
4.6. The Council’s Executive Committee (8 May 2024) approved the first phase of
investment from this Fund totalling around £8.4 million.  The 2024/2025 programme
will be increased to facilitate spend on these projects.   
Increase to Budget:  £8.400 million  
44

Page 45

4.7. General Capital Grant: In May 2024, the Scottish Government revised our
2024/2025 General Capital Grant allocation to £20.156 million.  This is an increase
of £0.880 million and reflects the distribution of the previously expected 2024/2025
Renewal of Play Parks allocation of £0.896 million.  However, as there is already a
allocation of £1.109 million in the 2024/2025 Programme for Play Parks reflecting
funding carried forward, no increase to the current year programme is proposed at
this stage. This will be added to the 2025/2026 Capital Programme.  Should the
funds be required in 2024/2025, the budget will be adjusted accordingly.         
No impact on Budget 
4.8. Hairmyres Station Park and Ride:  The estimated cost of completing the new park
and ride facility at Hairmyres Station is £4.6 million, funded from Glasgow City
Region City Deal (£2.000m) and Developer Contributions from the East Kilbride
Community Growth Area (£0.600m).  The balance of £2 million was originally
anticipated from Strathclyde Passenger Transport (SPT) however due to funding
reductions to their 2024/2025 budget, this was not added to the original programme.   
4.9. Following extensive discussions, Transport Scotland have agreed to provide a letter
of comfort stating that they will reimburse the Council in future financial years, if the
Council agree to forward fund the £2 million shortfall in funding (through additional
borrowing) to allow the project to progress.  This letter of comfort is being finalised
through Transport Scotland/South Lanarkshire Council discussions before final sign
off.  Based on this letter of comfort, it is proposed that the Council borrows on a
short-term basis, to fund the balance of the project spend (£2 million).  This
borrowing will be repaid when the funding is received from Transport Scotland. 
Because the money from Transport Scotland is a future funding stream, the Council
is not liable to make any principal repayments on this borrowing until the income is
received.  The Council will however be liable for interest on the outstanding amount
until such times as the balance is repaid.  This is estimated at £0.090 million per
annum.  It is expected that Transport Scotland will provide the funding by 2026/2027.   
4.10. The 2024/2025 Capital Programme includes an allocation of £1.979 million for this
project, funded by City Deal.  It is proposed that the budget be increased by a further
£2.6 million to include the additional borrowing (£2 million) as outlined at section
4.10, as well as the developer contributions (£0.600 million).  However, because of
the anticipated profile of spend, the additional borrowing will be slipped into
2025/2026.  When the results of the tender exercise and a programme of works is
known, this may be reprofiled.  
Increase to Budget:  £2.6 million
Slippage: (£2.0 million)  
45

Page 46

4.11. 2024/2025 General Services Base Budget Position:  Taking into account the
movements noted in sections 4.2 to 4.10, the General Services Programme for
2024/2025 is now £73.850 million.  This is the base budget for the financial year. 
This is summarised in Table 1 and is shown in detail, in Appendix 2 to this report. 
Table 1 – 2024/2025 General Services Base Budget 
2024/25
£m
Approved Programme – 21 February 2024 (Section 3.1) 49.512  
2023/2024 Carry Forward (Section 4.2) 14.121
2023/2024 Additional Funding Received (Section 4.3) 0.217
Previous Approvals (Section 4.4) 1.000
Leisure and Culture Transformation Fund (Section 4.6) 8.400
General Capital Grant (Sections 4.7) -
Hairmyres Station Park and Ride (Sections 4.8-4.10) 0.600  
2024/2025 General Services Base Budget  73.850 
4.12. General Fund – Period 2 Position:  Since the budget was approved in February
2024, Resources have submitted amendments to the programme totalling £8.790
million.  Based on the profile of spend, £2 million of the £6.795 million Levelling Up
Funding for the Three Rivers / Clydesdale Way project will be required in 2024/2025,
along with £5.4 million towards the Shawfield Remediation and Development project. 
In addition, Transport Scotland have advised an increase in the Active Travel Tier 1
Funding allocation in 2024/2025, of which our share will be £0.682 million. 
Furthermore, funding from Central Energy Efficiency Fund (£0.700m) and the
Shared Prosperity Fund (£0.008m) is also required to be added to the 2024/2025
programme.  A detailed breakdown of these proposals is included in Appendix 1.  If
these proposals are approved, the total budget for the year will be revised to £82.640
million. 
4.13. The programme spend and funding for the General Fund is summarised in Appendix
3.  As noted in Section 4.12 the total Capital Programme for the year is £82.640
million.  Budget for the period is £2.020 million and spend to the 17 May 2024 is also
£2.020 million.   
4.14. Actual funding received to 17 May 2024 is £40.989 million.  Relevant officers will
continue to closely monitor the generation of all income including receipts. 
5. 2024/2025 Housing Programme
5.1. Housing Programme – 2024/2025 Budget:  Section 3.2 notes that the total
approved Housing Capital programme for the year is £77.303 million.  The Final
Outturn report for financial year 2023/2024 noted a carry forward of £5.203 million
into future years. Further analysis of this budget confirms that £3.418 million is
required in 2024/2025, with the remainder being carried forward into future years. 
46

Page 47

5.2. In addition, the Scottish Government’s Affordable Housing grant for 2024/2025 has
now been confirmed. For South Lanarkshire, this will result in a reduction of £3.473
million in the 2024/2025 approved programme.  The impact of this is a reduction of
60 in the number of units purchased on the Market Purchase Scheme (down to 60
units from 120, a reduction of £3.000 million). The remaining £0.473m will be met
from the reprofiling of spend into future years with discussions ongoing with Scottish
Government on the projects that will be grant funded in 2024/25.  Future year
Affordable Housing grant funding, beyond 2024/2025, has still to be confirmed by the
Scottish Government. 
5.3. It is noted that the Scottish Government have advised that council’s will receive a
share of the £40 million funding for the National Acquisition Programme in
2024/2025.  The Council has not been advised of its share of these monies, but this
may allow 30 of the 60 units from the Market Purchase Scheme to be reinstated
(refer section 5.2).  Once this is confirmed, the programme will be amended
accordingly.   
5.4. As a result of the 2023/2024 carry forward position noted at Section 5.1 and the
adjustment at 5.2, a revised programme of £77.248 million is presented for approval
for 2024/2025.  Programme funding for the year also totals £77.248
million.  Appendix 4 summarises the position on the Housing programme as at 17
May 2024.   
5.5. Housing Programme – Period 2 Position:  Budget for the period is £5.050 million
and spend to 17 May 2024 amounts to £5.050 million.  As at 17 May 2024, £5.050
million of funding had been received. 
6. Employee Implications
6.1. There are no employee implications as a result of this report.  
7. Financial Implications
7.1. The General Services and Housing Programme Programmes and their spend position
to 17 May 2024 are detailed in sections 4 and 5 respectively. 
7.2. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to this Committee. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
47

Page 48

10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 June 2024 
Link(s) to Council Vision/Priorities/Values
 Accountable, Effective, Efficient and Transparent 
Previous References
▪ Finance and Corporate Resources Committee, 1 September 2021 
▪ South Lanarkshire Council, 21 February 2024 
List of Background Papers
 Capital Ledger prints to 17 May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk  
48

Page 49

Appendix 1
Proposed Adjustments 
Community and Enterprise Resources 
Three Rivers / Clydesdale Way
The Three Rivers/Clydesdale Way project, which is being led by Dumfries and
Galloway Council, is progressing well.  Based on the most recent projections, £2
million will be spent in financial year 2024/2025, with the balance of £5.550 million
required in 2025/2026.   
Approval is therefore sought to increase the 2024/2025 Capital Programme by £2
million.  This will be funded from the Levelling Up Funding (total £6.795 million).  The
remaining £4.795 million will be required in financial year 2025/2026 along with the
Council’s match funding contribution of £0.755 million.  This contribution was
approved by the Council previously and moved to financial year 2025/2026 as part
of the 2024/2025 Capital Programme Update (February 2024). 
£2.000m
Shawfield Remediation and Development
Levelling Up Funding totalling £14.638 million was also awarded to the Shawfield
Remediation and Development project, which is being led by Clyde Gateway Urban
Regeneration Company (URC). This funding will be paid directly to South
Lanarkshire on the basis of biannual claims, which will then be released to Clyde
Gateway. Due to the scale of this project, it is considered appropriate to include this
significant project in the Capital Programme for monitoring purposes. Both the spend
and funding will be transferred to revenue at the end of the financial year, to comply
with accounting guidelines. 
Based on the most recent spend profile received from Clyde Gateway URC, £5.4
million of expenditure will be incurred up to the end of this financial year, with the
remaining £9.238 million in 2025/2026.   Approval is sought to increase the
2024/2025 Capital Programme by £5.400 million.   
£5.400m
Active Travel Infrastructure Fund (previously Cycling Walking and Safer Routes)
The Active Travel Infrastructure grant allocation from the Scottish Government for
2024/2025 has now been confirmed as £2.122 million.  This is an increase of £0.682
million from the funding advised previously and included in the 2024/2025 Capital
Programme (Cycling, Walking and Safer Routes £1.440 million – approved 21
February 2024).  This will be used to deliver active travel interventions that enhance
safety and accessibility of existing infrastructure or introduce new provision to travel
safely and more conveniently.   Projects include new controlled junctions / crossings
to facilitate active travel to a public transport interchange, road safety schemes
which also enhance active travel and new walking and cycling infrastructure. 
£0.682m  
Housing and Technical Resources 
Central Energy Efficiency Fund (CEEF)
The CEEF is a revolving fund. The fund is used to pay for energy efficiency projects
each financial year.  The fund is then replenished by savings achieved from these
projects across an agreed payback period for each project.  A new wave of projects
is included in the capital programme each financial year.   
Approval is sought to add energy efficiency projects totalling £0.700 million into the
2024/25 Capital Programme.  Projects to be carried out include the installation of 
£0.700m
49

Page 50

photovoltaic panels at a number of primary schools (£0.505 million) along with the
Fleet Services Depot (Vista Point), Blantyre (£0.157 million).   
Furthermore, an additional funding bid of £0.152 million has been submitted to the
Scottish Power Energy Networks Transmission Net Zero Fund for a PV installation
at Rigside Hall. The Council will be required to contribute 20% match funding,
therefore an allocation of £0.038 million has also been included in the 2024/2025
programme, subject to the bid being successful.   These works will be funded from
the CEEF Fund (£0.200 million) along with an additional one-off contribution from
reserves of £0.500 million which was approved as an amendment to the 2024/2025
Council Revenue budget.    
Minor Adjustments £0.008m  
TOTAL ADJUSTMENTS £8.790m 
50

Page 51

APPENDIX 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 17 MAY 2024 
£m  
Total Base Budget (including carry forward from 2023/2024) 73.850  
Proposed Adjustments – Period 2 8.790  
Total Revised Budget 82.640   
2024/25
Budget 
Period 2
Proposed
Adjustments 
Revised
2024/25
Budget
Resource £m £m £m    
Community & Enterprise 50.574 8.090 58.664
Education 8.234 - 8.234
Finance & Corporate 3.086 - 3.086
Housing & Technical 10.929 0.700 11.629
Social Work 1.027 - 1.027    
TOTAL CAPITAL PROGRAMME 73.850 8.790 82.640     
51

Page 52

APPENDIX 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2024/25       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 17 MAY 2024 
2024/25
Original
Estimate inc
C/F 
2024/25
Revised
Budget 
2024/25
Budget to
17/05/24 
2024/25
Actual to
17/05/24     
Expenditure £m £m £m £m     
General Fund Programme 73.850 82.640 2.020 2.020 
Income
2024/25
Budget
2024/25
Revised
Budget 
2024/25
Actual
To
17/05/24         
£m         £m  £m
Prudential Borrowing 32.262 32.262  32.262
Developers Contributions 8.800 8.800  0.000
Partners (Including Scotland’s Public
Sector Heat Decarbonisaton Fund, Cycling
Scotland, Transport Scotland and Wind
Farms)
0.891 0.891  0.128
Scottish Government:     
- Capital Grant 20.156 22.278  3.359 
- Cycling, Walking and Safer
Routes (now included in General
Capital Grant)
1.440 0.000  0.000 
- Vacant and Derelict Land 1.793 1.793  1.369 
- Regeneration Capital Grant  2.170 2.170  0.993 
- Place Based Investment
Programme
1.319 1.319  0.921
Shared Prosperity Fund 2.422 2.430  0.000
Levelling Up Fund 0.000 7.400  0.000
Capital Receipts 1.340 1.340  0.000
Specific Reserves 1.257 1.957  1.957
Revenue Contribution 0.000 0.000  0.000     
TOTAL FUNDING 73.850 82.640  40.989 
52

Page 53

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2024/25
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2024 TO 17 MAY 2024 
2024/25
Annual 
Budget  
2024/25
Budget to
17/05/24
2024/25 
Actual to
17/05/24 
£m £m £m
Expenditure 
2024/25 Budget  77.248  5.050  5.050 
2024/25
Annual 
Budget 
2024/25
Actual to
17/05/24 
£m  £m
INCOME   
Capital Receipts 0.000  0.053
Capital Receipts – Land Sales 0.000  0.000
Capital Funded from Current Revenue 33.506  4.829
Prudential Borrowing 23.677  0.000
Scottish Government Specific Grant:   
- New Build 16.945  0.000
- Open Market Purchase Scheme 3.000  0.000
- Mortgage to Rent 0.120  0.000
Other Income 0.000  0.168 
77.248  5.050 
53

Page 54

54

Page 55

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Additional Funding from Scottish Government and
Other External Sources 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £3.320 million, detailed in appendices 1 and
2, be noted. 
3. Background
3.1. The Council is periodically advised of additional funding which is made available from
the Scottish Government and other sources to enable various initiatives to be
undertaken. 
3.2. Additional funding may either be paid through the General Revenue / Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding are attached in appendices 1 and 2 of the report.  The
report details additional funding that has been reported by Resources as part of the
additional resources notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £0.542 million has been identified for 2024/2025. These
are detailed in Appendix 1.   
5.2. Additional Capital funding of £2.778 million has been identified for 2024/2025. This is
detailed in Appendix 2.   
5.3. The total additional funding is therefore £3.320 million, and Resource budgets have
been updated to reflect this additional funding as required. Where appropriate, details
of spending plans will be presented to Resource Committees for approval. 
7
55

Page 56

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
4 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee on 8 May 2024 
List of Background Papers
 Additional Funding Reports 5 May to 6 June 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
56

Page 57

Appendix 1 
Additional Revenue Funding 
Resource  Description  2024/2025
£m 
Total
£m 
Method
Finance
and
Corporate
Discretionary Housing Payments – Tranche 2
2023/2024 – national underspends allocated
to councils for use in 2024/2025.
0.347 0.347 Scottish
Government –
General
Revenue
Grant
Community
and
Enterprise
Employability Child Poverty Co-ordinator
posts for 2024/2025.  
0.195 0.195 Scottish
Government –
General
Revenue
Grant 
TOTAL REVENUE FUNDING 0.542 0.542 
57

Page 58

Appendix 2 
Additional Capital Funding 
Resource  Description  2024/2025
£m 
Total
£m 
Method
Education Public Sector Heat Decarbonisation
Fund 
Grant funding allocation of £1.2 million
has been received from Salix to
contribute towards retrofitting the
heating system at Our Lady of Lourdes
Primary School, East Kilbride. 
1.200 1.200 Salix – Public
Sector Heat
Decarbonisation
Fund
Community &
Enterprise
Active Travel – Tier 1 Funding
2024/2025
The full award is £2.122 million,
however, £1.440 million of Cycling,
Walking and Safer Routes funding, was
already advised and is now rolled up
into the Active Travel award.  £0.682
million is the net increase. 
0.682 0.682 Transport
Scotland (via
General Capital
Grant)
Community &
Enterprise
Capital Grant for Play Parks
This is the Council’s allocation of the
fourth annual national funding for
playparks.  
0.896 0.896 General Capital
Grant 
TOTAL CAPITAL FUNDING 2.778 2.778 
58

Page 59

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Employee Workforce Monitoring Information - April
2023 to March 2024 Yearly Summary 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information relating to the Council for the period
April 2023 to March 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for April 2023 to March 2024
relating to the Council be noted:- 
 attendance statistics
 occupational health
 accidents/incidents
 discipline, grievance and Dignity at Work
 employee development
 labour turnover/analysis of leavers and exit interviews
 recruitment monitoring
 Staffing Watch as at 9 March 2024
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, the following
monitoring information is submitted to the Executive Committee.  This report for the
Council provides information on the position for the period April 2023 to March 2024. 
4. Attendance Statistics
4.1. Information on absence statistics for April 2023 to March 2024 for the Council and
each Resource is provided in Appendices 1 – 8.  Points to note are: 
 the Council’s average absence rate for April 2023 to March 2024 was 5.4%, a
decrease of 0.3% when compared to the previous year
 the APT&C average absence rate for April 2023 to March 2024 was 5.4%, this
figure remains unchanged when compared to the previous year
 the teaching staff average absence rate for April 2023 to March 2024 was 3.3%,
a decrease of 0.1% when compared with the previous year
 the manual workers’ average absence rate for April 2023 to March 2024 was
7.2%, a decrease of 0.9% when compared with the previous year
8
59

Page 60

In comparison to April 2023 to March 2024 (Appendix 8): 
 psychological and musculoskeletal conditions are the main reasons for absence
 total days lost due to musculoskeletal conditions have increased by 1,967 days
 total days lost due to psychological conditions have increased by 1,868 days
 total days lost due to stomach, bowel, blood and metabolic disorders have
decreased by 496 days
 total days lost due to respiratory conditions have decreased by 11,101 days 
5. Occupational Health
5.1. Information on Occupational Health for the period April 2023 to March 2024 is
provided in Appendix 9:- 
 over the year musculoskeletal and psychological conditions were the main
reasons for medical referrals; this remains unchanged from the previous year
 during the year there were a total of 1,493 employees referred for a medical
examination and when compared to the previous year this represents an
increase of 4 employees being referred
 during the period, a total of 1,998 employees attended physiotherapy treatment,
which is an increase of 71 when compared to the previous year.  Of the 1,998
employees referred, 67% remained at work whilst undertaking treatment
 over the year 1,903 employees were referred to the Employee Support Officer,
an increase of 90 when compared to the previous year.  Of those referrals
made during the period, 87% related to personal issues
 during the year there were 719 referrals for counselling, this represents an
overall increase of 119 referrals when compared with the same period last year
 over the year a total of 31 employees were referred for Cognitive Behavioural
Therapy, an increase of 15 when compared to the same period last year 
6. Accidents/Incidents
6.1. The accident/incident report for the period April 2023 to March 2024 is contained in
Appendix 10:- 
 the number of accidents/incidents recorded for the year was 1,879, an increase
of 137 when compared to April 2022 – March 2023
 the number of specified injuries/incidents recorded was 9, this is an increase of
3 when compared to April 2022 – March 2023
 the number overall of minor accidents/incidents recorded for the year April
2023- March 2024 is 1,820 this in an increased by 138 when compared with
April 2022 – March 2023
 the number of accidents resulting in an absence lasting over 3 days recorded
for the period April 2023 – March 2024 is 7, this is a decrease by 2 when
compared with April 2022 – March 2023
 the number of accidents resulting in an absence lasting over 7 days recorded
for the period April 2023 - March 2024 is 43, this is a decrease of 2 when
compared with April 2022 – March 2023
60

Page 61

7. Discipline, Grievance, Dignity at Work
7.1. Information on Disciplinary, Grievance Hearings and Dignity at Work for the period
April 2023 to March 2024 is contained in Appendices 11 and 12:- 
 during the period, a total of 175 disciplinary hearings were held across
Resources within the Council, which represents an increase of 9 when
compared to April 2022 to March 2023.  Action was taken in 161 of these
cases.  There were 2 Resource appeals raised against the outcomes
 our target is to convene disciplinary hearings within 6 weeks.  During the period
83% of hearings met this target which represents an increase of 10% when
compared to the same period last year
 during the year, 14 appeals were submitted to the Appeals Panel, of which 1
was upheld in part and 9 were not upheld.  Four appeals were withdrawn during
the year
 at the end of March 2024, 3 Appeals Panels were pending
 overall, 18 grievances were raised during the year, this figure remains
unchanged when compared with the previous year
 there were 11 Dignity at Work incidents raised this year, an increase of 3 when
compared with the previous year
 during the period, 5 referrals for mediation were submitted, this figure remains
unchanged when compared with the previous year 
8. Employee Development
8.1. Information on Employee Development for the period April 2023 to March 2024 is
contained in Appendices 13 and 13a:- 
 the Council is committed to ensuring that every employee is provided with the
opportunity to undertake learning and development which relates to their job
 during this period there were 12,010 attendances at classroom learning and
development events.  There were 4,396 attendances at virtual classroom
learning and development events
 as our Learn on Line continues to develop, employees have successfully
completed 125,325 e-learning packages covering a wide variety of subjects  
9. Labour Turnover/Analysis of Leavers and Exit Interviews
9.1. Labour Turnover
Information on the number of leavers and exit interviews for the period April 2023 –
March 2024 is contained in Appendix 14.  Exit interviews are conducted with leavers
who leave voluntarily. 
The Council’s labour turnover figure for April 2023 to March 2024 is 4.7% and this
figure has decreased by 0.3% when compared to the same period last year. 
9.2. Analysis of Leavers and Exit Interviews
 during April 2023 to March 2024 there were 713 leavers eligible for an exit
interview, a decrease of 41 when compared with April 2022 to March 2023
 there were 224 Exit interviews carried out in April 2023 to March 2024 which
represents 31% of leavers, this is a decrease of 56 Exit interviews which
represents a decrease of 6% of leavers when compared with April 2022 to
March 2023
61

Page 62

9.3. Managers are asked to identify whether they intended to replace the employee who
had left the Council.  If they indicated that they did not intend to replace the
employee, they were asked to select from five options:- 
 plan to hold for savings
 leave post vacant pending a savings / service review
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term contract 
9.4. During April 2023 - March 2024, 1,754 employees (1270.47 FTE) left employment
and managers indicated that 1,587 posts (1157.24 FTE) would be replaced.  44
posts (10.92 FTE) were being filled on a temporary basis, 1 post (0.95 FTE) was
planning to transfer the budget to other post, 78 posts (67.12 FTE) were due to the
end of fixed term contracts, 37 posts (29.11 FTE) were being left vacant pending a
savings or service review and 7 posts (5.13 FTE) were to be removed for savings. 
10. Recruitment Monitoring
10.1. Information on Recruitment Monitoring for the period April 2023 to March 2024 is
contained within Appendix 15.  From an analysis of Equal Opportunities Monitoring
Forms, the main points to note are:- 
 96% of applicants completed an Equal Opportunities Monitoring Form, which is
a decrease of 1% when compared with April 2022 to March 2023
 of the 529 applicants who declared themselves as disabled, 284 were
shortleeted for interview and 35 were appointed.  This compares to 296
applicants the previous year, of which 176 applicants were shortleeted and 39
were appointed
 of the 1,900 applicants from a black/ethnic background, 538 were shortleeted
for interview and 57 were appointed.  This compares to 634 applicants the
previous year, of which 217 were shortleeted and 39 were appointed
 of the 161 applicants who declared themselves as a Veteran, 82 were
shortleeted for interview and 3 were appointed.  This compares to 148
applicants the previous year, of which 90 were shortleeted and 1 was appointed 
11. Staffing Watch
11.1. Details of the number of employees in post at 9 March 2024 are contained in
Appendix 16.  There were 14,969 employees in post as at 9 March 2024 compared
to 14,983 as at 11 March 2023, a decrease of 14 employees.  
12. Employee Implications
12.1. There are no implications for employees arising from the information presented in
this report. 
13. Financial Implications
13.1. All financial implications are accommodated within existing budgets. 
14. Climate Change, Sustainability and Environmental Implications
14.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information presented in this report.
62

Page 63

15. Other Implications
15.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
16. Equality Impact Assessment and Consultation Arrangements
16.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required 
16.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor 
Executive Director (Finance and Corporate Resources) 
23 May 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 21 June 2023 
List of Background Papers
 monitoring information provided by Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext: 4647 (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
63

Page 64

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 4.1 5.2 5.2 April 2.5 2.7 2.8 April 6.2 8.8 7.0 April 4.3 5.6 5.1
May 4.7 5.0 5.1 May 3.2 3.6 3.2 May 6.7 7.6 6.2 May 4.9 5.4 5.1
June 4.4 5.0 4.9 June 2.6 2.6 2.2 June 7.0 8.1 6.5 June 4.7 5.3 4.7
July 4.1 4.5 4.0 July 1.1 1.4 1.1 July 6.3 7.4 5.8 July 4.0 4.6 3.8
August 4.6 4.3 4.2 August 2.0 1.4 1.3 August 7.3 7.4 6.2 August 4.7 4.4 4.1
September 6.1 5.2 5.2 September 4.4 2.8 2.9 September 8.5 8.0 7.6 September 6.4 5.4 5.3
October 6.0 5.7 5.2 October 4.1 3.4 2.7 October 8.7 8.1 7.1 October 6.3 5.8 5.1
November 6.5 6.3 6.1 November 5.6 4.7 4.3 November 8.7 8.6 8.1 November 6.9 6.5 6.2
December 6.2 6.7 6.7 December 6.1 5.3 4.8 December 8.8 8.9 7.8 December 6.9 7.0 6.6
January 6.7 5.2 5.8 January 3.9 4.3 4.8 January 10.1 8.0 7.8 January 7.0 5.8 6.1
February 6.5 5.7 6.3 February 3.7 4.1 4.9 February 9.5 7.9 8.0 February 6.6 5.9 6.4
March 8.0 6.2 6.3 March 4.3 4.6 4.1 March 11.3 8.3 8.1 March 7.9 6.4 6.3
Annual Average 5.7 5.4 5.4 Annual Average 3.6 3.4 3.3 Annual Average 8.3 8.1 7.2 Annual Average 5.9 5.7 5.4
7673 3983 4409 16065No of Employees at 31 March 2024
Appendix 1
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Council Wide
APT&C Teachers
No of Employees at 31 March 2024 No of Employees at 31 March 2024
Manual Workers Council Wide
No of Employees at 31 March 2024 
64

Page 65

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 2.3 4.4 3.6 April 5.7 7.3 6.3 April 5.2 6.9 6.0 April 4.3 5.6 5.1
May 2.7 3.9 3.7 May 6.4 6.8 6.3 May 5.9 6.3 5.9 May 4.9 5.4 5.1
June 2.8 3.5 4.3 June 6.6 7.2 5.9 June 6.0 6.7 5.7 June 4.7 5.3 4.7
July 2.9 3.9 2.3 July 5.3 5.9 4.6 July 4.9 5.6 4.3 July 4.0 4.6 3.8
August 2.9 3.4 3.0 August 6.4 6.6 5.2 August 5.9 6.1 4.9 August 4.7 4.4 4.1
September 3.4 3.1 2.5 September 8.2 7.9 7.1 September 7.5 7.1 6.4 September 6.4 5.4 5.3
October 3.8 5.1 2.0 October 7.9 7.5 7.0 October 7.3 7.1 6.3 October 6.3 5.8 5.1
November 3.5 4.2 2.6 November 8.0 8.3 8.1 November 7.3 7.7 7.3 November 6.9 6.5 6.2
December 4.2 3.7 3.0 December 8.0 8.8 7.5 December 7.4 8.0 6.8 December 6.9 7.0 6.6
January 3.6 2.6 3.6 January 9.6 7.4 7.4 January 8.6 6.7 6.9 January 7.0 5.8 6.1
February 4.4 3.6 4.0 February 9.5 7.4 7.8 February 8.7 6.9 7.2 February 6.6 5.9 6.4
March 6.0 3.9 3.2 March 11.0 7.9 7.9 March 10.2 7.3 7.2 March 7.9 6.4 6.3
Annual Average 3.5 3.8 3.2 Annual Average 7.7 7.4 6.8 Annual Average 7.1 6.9 6.2 Annual Average 5.9 5.7 5.4
527 2805 3332 16065
Appendix 2
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024
65

Page 66

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 4.8 5.5 5.0 April 2.5 2.7 2.8 April 3.5 4.0 3.8 April 4.3 5.6 5.1
May 5.7 5.5 5.4 May 3.2 3.6 3.2 May 4.4 4.5 4.2 May 4.9 5.4 5.1
June 4.7 5.1 4.8 June 2.6 2.6 2.2 June 3.5 3.7 3.4 June 4.7 5.3 4.7
July 3.4 3.8 3.4 July 1.1 1.4 1.1 July 2.1 2.5 2.2 July 4.0 4.6 3.8
August 3.8 3.6 4.0 August 2.0 1.4 1.3 August 2.8 2.4 2.5 August 4.7 4.4 4.1
September 6.4 5.8 5.9 September 4.4 2.8 2.9 September 5.3 4.1 4.3 September 6.4 5.4 5.3
October 6.6 6.5 5.5 October 4.1 3.4 2.7 October 5.2 4.8 4.0 October 6.3 5.8 5.1
November 8.0 7.9 7.1 November 5.6 4.7 4.3 November 6.7 6.2 5.6 November 6.9 6.5 6.2
December 8.0 8.5 8.1 December 6.1 5.3 4.8 December 7.0 6.8 6.3 December 6.9 7.0 6.6
January 8.1 6.1 6.6 January 3.9 4.3 4.8 January 5.8 5.1 5.6 January 7.0 5.8 6.1
February 7.2 6.8 7.2 February 3.7 4.1 4.9 February 5.3 5.4 6.0 February 6.6 5.9 6.4
March 9.5 7.0 7.5 March 4.3 4.6 4.1 March 6.7 5.7 5.7 March 7.9 6.4 6.3
Annual Average 6.4 6.0 5.9 Annual Average 3.6 3.4 3.3 Annual Average 4.9 4.6 4.5 Annual Average 5.9 5.7 5.4
3542 3983 7525 16065No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024
Appendix 3
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Education Resources
Council WideAPT&C Teachers Resource Total
66

Page 67

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 2.6 2.8 3.6 April 0.0 0.0 0.0 April 2.6 2.8 3.6 April 4.3 5.6 5.1
May 3.3 3.2 3.9 May 0.0 0.0 0.0 May 3.3 3.2 3.9 May 4.9 5.4 5.1
June 3.5 4.0 4.2 June 0.0 0.0 0.0 June 3.5 4.0 4.2 June 4.7 5.3 4.7
July 3.3 3.9 3.5 July 0.0 0.0 0.0 July 3.3 3.9 3.5 July 4.0 4.6 3.8
August 3.6 4.1 3.8 August 0.0 0.0 0.0 August 3.6 4.1 3.8 August 4.7 4.4 4.1
September 4.0 3.6 3.9 September 0.0 0.0 0.0 September 4.0 3.6 3.9 September 6.4 5.4 5.3
October 3.6 3.8 3.2 October 0.0 0.0 0.0 October 3.6 3.8 3.2 October 6.3 5.8 5.1
November 4.3 3.4 3.5 November 0.0 0.0 0.0 November 4.3 3.4 3.5 November 6.9 6.5 6.2
December 3.8 4.3 3.3 December 0.0 0.0 0.0 December 3.8 4.3 3.3 December 6.9 7.0 6.6
January 3.8 4.3 2.8 January 0.0 0.0 0.0 January 3.8 4.3 2.8 January 7.0 5.8 6.1
February 3.4 3.8 3.5 February 0.0 0.0 0.0 February 3.4 3.8 3.5 February 6.6 5.9 6.4
March 3.4 3.8 2.6 March 0.0 0.0 0.0 March 3.4 3.8 2.6 March 7.9 6.4 6.3
Annual Average 3.6 3.8 3.5 Annual Average 0.0 0.0 0.0 Annual Average 3.6 3.8 3.5 Annual Average 5.9 5.7 5.4
879 0 879 16065
Manual Workers
No of Employees at 31 March 2024
Resource Total
No of Employees at 31 March 2024
Appendix 4
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Finance and Corporate Resources
No of Employees at 31 March 2024 No of Employees at 31 March 2024
APT&C Council Wide
67

Page 68

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 3.2 5.5 5.7 April 3.6 10.6 6.9 April 3.3 7.6 6.2 April 4.3 5.6 5.1
May 2.9 4.5 4.9 May 4.2 8.1 6.1 May 3.4 6.0 5.4 May 4.9 5.4 5.1
June 3.5 4.9 5.4 June 6.2 8.5 6.8 June 4.6 6.4 6.0 June 4.7 5.3 4.7
July 4.0 5.5 5.0 July 5.7 8.9 8.1 July 4.7 6.9 6.2 July 4.0 4.6 3.8
August 4.9 4.7 5.1 August 7.9 7.1 8.5 August 6.2 5.7 6.4 August 4.7 4.4 4.1
September 5.8 4.5 4.7 September 8.1 6.3 7.8 September 6.8 5.2 6.0 September 6.4 5.4 5.3
October 5.2 4.3 4.9 October 9.0 7.8 5.2 October 6.8 5.8 5.0 October 6.3 5.8 5.1
November 5.7 4.6 4.8 November 9.2 7.8 6.7 November 7.2 5.9 5.6 November 6.9 6.5 6.2
December 4.6 4.4 5.1 December 9.5 7.2 7.4 December 6.7 5.6 6.0 December 6.9 7.0 6.6
January 5.2 4.5 4.4 January 8.8 5.5 6.0 January 6.7 4.9 5.0 January 7.0 5.8 6.1
February 6.4 4.4 5.2 February 8.5 6.2 6.3 February 7.3 5.1 5.6 February 6.6 5.9 6.4
March 7.8 5.3 5.3 March 10.7 6.8 7.2 March 9.0 5.9 6.1 March 7.9 6.4 6.3
Annual Average 4.9 4.8 5.0 Annual Average 7.6 7.6 6.9 Annual Average 6.1 5.9 5.8 Annual Average 5.9 5.7 5.4
875 565 1440 16065No of Employees at 31 March 2024No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024
Appendix 5
Housing & Technical Resources
Resource Total
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
APT&C Manual Workers Council Wide
68

Page 69

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 4.5 6.2 6.5 April 9.6 12.6 9.4 April 6.2 8.3 7.4 April 4.3 5.6 5.1
May 5.0 5.7 5.8 May 9.3 10.1 8.4 May 6.5 7.1 6.6 May 4.9 5.4 5.1
June 3.9 5.9 5.5 June 7.6 11.3 8.6 June 5.2 7.6 6.5 June 4.7 5.3 4.7
July 6.1 6.0 5.4 July 10.3 11.8 8.8 July 7.5 7.9 6.5 July 4.0 4.6 3.8
August 7.3 6.0 4.8 August 10.2 10.8 8.6 August 8.2 7.5 6.0 August 4.7 4.4 4.1
September 7.6 5.9 5.6 September 10.3 9.6 9.3 September 8.5 7.1 6.8 September 6.4 5.4 5.3
October 6.9 5.8 6.5 October 11.3 10.4 8.5 October 8.4 7.3 7.1 October 6.3 5.8 5.1
November 6.2 6.0 7.3 November 10.8 10.4 9.0 November 7.7 7.4 7.8 November 6.9 6.5 6.2
December 5.5 6.4 7.4 December 11.1 10.6 9.5 December 7.3 7.7 8.1 December 6.9 7.0 6.6
January 7.4 5.2 7.0 January 13.0 12.0 10.3 January 9.2 7.4 8.1 January 7.0 5.8 6.1
February 7.5 5.8 7.0 February 10.1 11.0 9.9 February 8.3 7.5 7.9 February 6.6 5.9 6.4
March 8.0 7.0 7.1 March 12.8 10.9 9.4 March 9.5 8.2 7.9 March 7.9 6.4 6.3
Annual Average 6.3 6.0 6.3 Annual Average 10.5 11.0 9.1 Annual Average 7.7 7.6 7.2 Annual Average 5.9 5.7 5.4
1850 1039 2889 16065No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024 No of Employees at 31 March 2024
Appendix 6
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Social Work Resources
APT&C Council WideResource TotalManual Workers
69

Page 70

Appendix 7
Community and Enterprise 2.2 4.0 6.2
Education 1.6 2.8 4.5
Finance and Corporate 1.3 2.2 3.5
Housing & Technical 2.0 3.8 5.8
Social Work 2.4 4.9 7.2
Council Overall for           
April 2023 - March 2024 1.9 3.5 5.4
Absence by Long and Short Term
From: 1 April 2023 - 31 March 2024
Resource Total Long
Term %
April 2023 - March 2024
Total Short
Term %
Resource Total
Absence %
70

Page 71

Appendix 8
Reason Total Work Days Lost % of Work Days Lost
Psychological 72326 36
Musculoskeletal 44456 21
Respiratory 27859 13
Stomach 19375 9
Others 44385 21
Total Days Lost 208401 100
Reason Total Work Days Lost % of Work Days Lost
Psychological 70458 32
Musculoskeletal 42489 19
Respiratory 38960 18
Stomach 19871 9
Others 47532 22
Total Days Lost 219310 100
Absence Monitoring
Absence Classifications
From 1 April 2023 to 31 March 2024
From 1 April 2022 to 31 March 2023
71

Page 72

FROM: 1 April 2023 - 31 March 2024 comparison with 1 April 2022 - 31 March 2023
Teachers Others
419 169 216 48 229 412
422 130 194 84 227 432
RESOURCE Apr-Mar
2022/23
Apr-Mar
2023/24 RESOURCE Apr-Mar
2022/23
Apr-Mar
2023/24 RESOURCE Apr-Mar
2022/23
Apr-Mar
2023/24
Community and Enterprise 475 531 Community and Enterprise 383 414 Community and Enterprise 0 0
Education (Teachers) 307 277 Education 757 798 Education 7 9
Education (Others) 375 385 Finance and Corporate 96 94 Finance and Corporate 0 0
Finance and Corporate 87 91 Housing and Technical 128 146 Housing and Technical 0 3
Housing and Technical 210 249 Social Work 449 451 Social Work 1 6
Social Work 473 465 Total 1813 1903 8 13
Total 1927 1998 Total 16 31
M S M S M S M S M S M S
Total (Apr-Mar 2023/24) 140 0 0 0 359 0 94 0 126 0 719 0
Total (Apr-Mar 2022/23) 134 0 0 0 398 0 10 0 58 0 600 0
719
600
M = Management Referral      S = Self Referral
Appendix 9
Total Referrals (Apr-Mar 2023/24)     
Total Referrals (Apr-Mar 2022/23)     
Analysis of Counselling Referrals by Cause
Reason
Work Stress Addiction Personal Anxiety/ Depression Bereavement Total
Total (Apr-Mar 2023/24) 1493
Total (Apr-Mar 2022/23) 1489
No of Employees Referred For Physiotherapy No of Employees Referred To Employee
Support Officer
No of Employees Referred For Cognitive
Behavioural Therapy
Not Disclose
Occupational Health Reports
Medical Referrals
Community
and
Enterprise
Education Finance and
Corporate
Housing &
Technical Social Work Totals
72

Page 73

2022/23 2023/24 2022/23 2023/24 2022/23 2023/24 2022/23 2023/24 2022/23 2023/24 2022/23 2023/24
Specified Injury 1 3 2 4 0 0 0 0 3 2 6 9
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Total Specified Injury* 1 3 2 4 0 0 0 0 3 2 6 9
Over 7-day 23 24 6 6 0 0 8 4 8 9 44 43
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Violent Incident:  Verbal 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 7-day** 23 24 6 6 0 0 8 4 8 9 45 43
Over 3-day 1 1 4 2 0 0 1 1 3 3 9 7
Violent Incident:  Physical 0 0 0 0 0 0 0 0 0 0 0 0
Violent Incident:  Verbal 0 0 0 0 0 0 0 0 0 0 0 0
Total Over 3-day** 1 1 4 2 0 0 1 1 3 3 9 7
Minor 81 97 63 78 3 3 17 17 69 64 233 259
Near Miss 17 25 7 15 0 0 4 3 3 4 31 47
Violent Incident:  Physical 14 31 1208 1253 0 0 1 0 45 65 1268 1349
Violent Incident:  Verbal 15 15 105 127 1 1 7 5 22 17 150 165
Total Minor*** 127 168 1383 1473 4 4 29 25 139 150 1682 1820
Total Accidents/Incidents 152 196 1395 1485 4 4 38 30 153 164 1742 1879
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury,
a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith major injury category that results in a period of absence of absence as defined by the HSE. 
*** A minor injury is an injury not covered by " Over 7-day", "Over 3-day" or "Specified".
Analysis of Accidents/Incidents
Appendix 10
Comparison
Cause of Accidents/Incidents to Employees
Community and
Enterprise Education Finance and
Corporate Housing & Tech Social Work TOTAL
FROM: 1 April 2023 - 31 March 2024 comparison with 1 April 2022 - 31 March 2023
73

Page 74

APT&C Manual /
Craft Teachers Total APT&C Manual /
Craft Teachers Total
Community and Enterprise 1 98 N/A 99 0 4 N/A 4 1 94 N/A 95 64 19 16 84%
Education 7 13 12 32 0 5 3 8 7 8 9 24 18 5 9 72%
Finance and Corporate 4 2 N/A 6 0 0 N/A 0 4 2 N/A 6 4 1 1 83%
Housing and Technical 4 6 N/A 10 0 1 N/A 1 4 5 N/A 9 6 4 0 100%
Social Work 3 25 N/A 28 0 1 N/A 1 3 24 N/A 27 17 7 4 86%
Total (Apr-Mar 2023/24) 19 144 12 175 0 11 3 14 19 133 9 161 109 36 30 83%
Total (Apr-Mar 2022/23) 20 141 5 166 2 15 1 18 18 126 4 148 86 36 44 73%
APT&C Manual/
Craft Teachers Total APT&C Manual/
Craft Teachers Total APT&C Manual/
Craft Teachers Total
Total (Apr-Mar 2023/24) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total (Apr-Mar 2022/23) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
*Resources nil responses are not included in figures
Appeal's Panel
FROM: 1 April 2023 - 31 March 2024
Appeal's Panel
4-6
Upheld in Part Not Upheld Total
Appendix 11
Withdrawn
6+
% Held
within 6
Weeks
Upheld in Part
Record of Disciplinary Hearings
No of weeks to convene Disciplinary
Hearing
Total
Manual/
Craft
Upheld
N.B.  Non-White employees refers to those employees who have indicated that they are:-  Any other mixed background, Indian, Pakistani, Bangladeshi, Chinese, Any other Asian background, Caribbean, African and any other black background.
No Action
Outcome of Disciplinary Hearings
Teachers 3
RESOURCE
APT&C
Action Taken
0 1 9 10
Upheld
Outcome of Appeals
RESOURCE
Total
No of Appeals
APT&C
Not Upheld
34
Appeals
Pending
FROM: 1 April 2023 - 31 March 2024 comparison with 1 April 2022 - 31 March 2023
Appeals pending
to date
No of Disciplinary Hearings
Manual/
Craft Teachers
74

Page 75

Record of Grievances
Grievances No of
Grievances
No Resolved at
Stage 1
No Resolved at
Stage 2
No Resolved at
Stage 3
Still in
Process
Community and Enterprise 6 0 5 0 1
Education 5 2 3 0 0
Finance and Corporate 0 0 0 0 0
Housing and Technical 5 0 5 0 0
Social Work 2 0 2 0 0
Total (Apr-Mar 2023/24) 18 2 15 0 1
Total (Apr-Mar 2022/23) 18 2 13 3 0
Dignity at Work
Dignity at Work No of Incidents No Resolved at
Informal Stage
No Resolved at
Formal Stage No of Appeals Appeals in
Process
Still in
Process
Community and Enterprise 2 0 2 0 0 0
Education 0 0 0 0 0 0
Finance and Corporate 0 0 0 0 0 0
Housing and Technical 7 0 7 0 0 0
Social Work 2 0 1 0 0 1
Total (Apr-Mar 2023/24) 11 0 10 0 0 1
Total (Apr-Mar 2022/23) 8 0 8 0 0 0
FROM: 1 April 2023 - 31 March 2024 comparison with 1 April 2022 - 31 March 2023
FROM: 1 April 2023 - 31 March 2024 comparison with 1 April 2022 - 31 March 2023
Appendix 12a
75

Page 76

Referrals for Workplace Mediation
Workplace Mediation Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24
No of Referrals 0 2 1 0 0 1 0 0 0 1 0 0
*No of Successful Cases 0 0 0 0 0 0 1 0 0 0 0 0
*No of Unsuccessful Cases 0 0 0 0 0 0 0 0 0 0 0 0
No of cases unsuitable for mediation 0 1 0 1 1 0 0 0 0 0 1 0
Workplace Mediation Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23
No of Referrals 0 0 1 1 3 0 0 0 0 0 0 0
*No of Successful Cases 0 0 0 0 1 0 1 0 0 0 0 0
*No of Unsuccessful Cases 0 0 0 0 0 0 0 0 0 0 0 0
No of cases unsuitable for mediation 0 0 0 0 1 1 0 1 0 0 0 0
*successful/unsuccessful case outcomes may be shown outwith the month they were referred.
Appendix 12b
As at March 2024
76

Page 77

Attended classroom based training
Community and Enterprise 2810
Education 4264
Finance and Corporate 100
Housing and Technical 1117
Social Work 3719
Total 12,010
Attended training delivered virtually
Community and Enterprise 86
Education 2176
Finance and Corporate 310
Housing and Technical 241
Social Work 1583
Total 4,396
Courses Completed / Passed
Community and Enterprise 25837
Education 48211
Finance and Corporate 5079
Housing and Technical 13590
Social Work 32608
Total 125,325
Employee Development
1 April 2023 - 31 March 2024
Appendix 13
77

Page 78

Percentage (%) Count
Male 30.5% 6294
Female 69.5% 14334
Disabled 1.1% 217
Not Disabled 78.0% 15764
Not Disclosed 4.4% 893
Not Entered 16.5% 3330
White - Scottish 72.3% 14910
White - Other British 2.4% 488
White - Irish 0.4% 82
White - Any other Background 0.7% 146
Asian - Pakistani 0.2% 30
All Others 24.1% 4973
21 Years 1.2% 246
21-29 Years 23.6% 4870
30-39 Years 19.6% 4035
40-49 Years 20.4% 4203
50-59 Years 23.4% 4824
60-65 Years 9.2% 1907
Over 65 Years 2.6% 544
Finance and Corporate Resources
Appendix 13a
Employee Development
Monitoring Stats for all Training - 1 April 2023 - 31 March 2024
78

Page 79

Appendix 14
Exit Interviews (Apr-Mar 2023/24)
Reason for leaving Community and
Enterprise Education Finance and
Corporate
Housing &
Technical Social Work Total %
Career Advancement 15 43 7 12 28 105 47%
Personal Reasons 3 15 3 4 8 33 15%
Moving outwith area 2 7 2 2 3 16 7%
Disatisfaction with terms and
conditions 6 3 1 2 1 13 6%
Poor relationship with managers /
colleagues 7 1 1 2 1 12 5%
Travelling difficulties 1 1 0 1 4 7 3%
Further Education 0 4 0 0 2 6 3%
Child Caring / Caring
Responsibilities 2 0 1 0 3 6 3%
Other 15 5 0 0 6 26 12%
Number of exit interviews
conducted 51 79 15 23 56 224
Total no. of leavers per
Resource eligible for an exit
interview
187 279 37 57 153 713
% of leavers interviewed 27% 28% 41% 40% 37% 31%
Exit Interviews (Apr-Mar 2022/23)
Number of exit interviews
conducted 34 121 14 22 89 280
Total no. of leavers per
Resource eligible for an exit
interview
176 280 54 50 194 754
% of leavers interviewed 19% 43% 26% 44% 46% 37%
* Note these totals include temporary employees
Analysis of Leavers and Exit Interviews
79

Page 80

Resource Total FTE* Total H/C** FTE H/C FTE H/C FTE H/C FTE H/C FTE H/C FTE H/C
Community & Enterprise 337.79 541 271.96 469 3.63 5 0.00 0 57.74 61 4.46 6 0.00 0
Education 539.33 674 522.05 652 4.48 5 0.00 0 4.03 5 7.24 10 1.53 2
Finance & Corporate 67.48 87 62.08 81 1.00 1 0.00 0 0.00 0 3.40 4 1.00 1
Housing & Technical 100.64 125 95.93 119 0.00 0 0.00 0 2.11 3 2.00 2 0.60 1
Social Work 225.23 327 205.22 266 1.81 33 0.95 1 3.24 9 12.01 15 2.00 3
Total 1270.47 1754 1157.24 1587 10.92 44 0.95 1 67.12 78 29.11 37 5.13 7
Cumulative Grand Total 1270.47 1754 1157.24 1587 10.92 44 0.95 1 67.12 78 29.11 37 5.13 7
Appendix 14a
April 2023 - March 2024 Number of leavers Replace Employee Filling on a temp basis Plan to transfer this budget
to another post End of fixed term post
Leave vacant pending
savings or service
review
Plan to remove for
savings
80

Page 81

Appendix 15
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
14979 5346 1235 36% 8% 23%
4963 1598 344 32% 7% 22%
9986 3335 829 33% 8% 25%
529 284 35 54% 7% 12%
11558 3773 869 33% 8% 23%
3686 1266 307 34% 8% 24%
12896 4516 1125 35% 9% 25%
1900 538 57 28% 3% 11%
161 82 3 51% 2% 4%
Applied Interviewed Appointed % of Applicants
interviewed
% of Applicants
appointed
% of
Interviewees
appointed
11427 5953 1974 52% 17% 33%
3543 1929 475 54% 13% 25%
7836 3908 1369 50% 17% 35%
296 176 39 59% 13% 22%
9215 4699 1457 51% 16% 31%
2079 1078 379 52% 18% 35%
10647 5551 1783 52% 17% 32%
634 217 39 34% 6% 18%
148 90 1 61% 1% 0%
Total No of applicants aged over 50
Total No of White applicants
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
Gender / Disability / Age
Total EO Forms Received
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total Number of Equal Opportunities Monitoring forms received: 11427 (97%)
Total Number of posts recruited for: 2393
Total Number of appointments: 2050
Total No of Black/Ethnic minority applicants*
Total No of Veteran applicants
*Black/Ethnic Minority applicants includes Mixed, Asian, Black and other backgrounds.
From : 1 April 2022 - 31 March 2023
Total Number of applications received: 11771
Total No of Male Applicants
Total No of Female Applicants
Total No of Disabled Applicants
Total No of applicants aged under 50
Total No of applicants aged over 50
Total No of White applicants
Total Number of posts recruited for: 1931
Total Number of appointments: 1453
Gender / Disability / Age
Total EO Forms Received
Recruitment Monitoring
Analysis of Gender, Disability, Ethnicity and Age
From : 1 April 2023 - 31 March 2024
Total Number of applications received: 15592
Total Number of Equal Opportunities Monitoring forms received: 14979 (96%)
81

Page 82

Resource Total F/T P/T F/T P/T Total Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 2993 1112 273 198 1410 2074.37 5.00 1412.35 348.58 244.59 43.55 15.30 0.00 5.00 0.00
Education - Others 3311 128 101 661 2421 2416.53 4.96 1179.23 962.79 146.09 46.00 10.60 0.00 62.06 4.80
Education - Teachers 3880 696 80 2181 923 3492.85 0.00 0.00 0.00 0.00 0.00 1.00 0.00 6.60 3485.25
Finance & Corporate Resources 816 192 15 387 222 743.11 6.00 97.71 353.48 210.14 52.78 23.00 0.00 0.00 0.00
Housing & Technical 1273 787 24 330 132 1213.09 3.00 188.11 630.82 352.56 29.60 9.00 0.00 0.00 0.00
Social Work Resources 2696 202 203 994 1297 2359.33 3.00 327.92 1441.30 496.46 56.30 34.35 0.00 0.00 0.00
8806.43 (excluding Teachers)
Total All Staff 14969 3117 696 4751 6405 12299.28 21.96 3205.32 3736.97 1449.84 228.23 93.25 0.00 73.66 3490.05
** Change to report this is now run electronically which allows us to report on grade.
Resource Total F/T P/T F/T P/T Total Director Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher
Community & Enterprise Resources 3017 1176 235 201 1405 2109.86 1.00 1432.36 372.02 234.43 44.05 17.00 4.00 5.00 0.00
Education - Others 3296 137 96 683 2380 2424.23 1.00 1182.76 959.29 148.36 46.00 13.00 3.96 62.26 7.60
Education - Teachers 3834 676 73 2227 858 3469.50 0.00 0.00 0.00 0.00 0.00 1.00 0.00 6.60 3461.90
Finance & Corporate Resources 873 207 19 414 233 791.40 2.00 124.78 358.72 219.55 58.05 22.30 6.00 0.00 0.00
Housing & Technical 1297 817 27 326 127 1237.80 1.00 207.47 634.50 352.23 29.60 11.00 2.00 0.00 0.00
Social Work Resources 2666 204 186 948 1328 2332.00 1.00 1105.28 633.47 523.69 36.80 29.76 2.00 0.00 0.00
8895.29 (excluding Teachers)
Total All Staff 14983 3217 636 4799 6331 12364.79 6.00 4052.65 2958.00 1478.26 214.50 94.06 17.96 73.86 3469.50
** Change to report this is now run electronically which allows us to report on grade.
Female Salary Band
Total Number of Employees Full-Time Equivalent
Male Female Salary Band
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 11 MARCH 2023
Male
QUARTERLYJOINT STAFFING WATCH RETURN : NUMBER EMPLOYED ON 9 MARCH 2024
Analysis by Resource
Appendix 16
Analysis by Resource
Total Number of Employees Full-Time Equivalent
82

Page 83

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: 2025/2026 to 2027/2028 Revenue Budget Strategy 
1. Purpose of Report 
1.1. The purpose of the report is to:- 
 advise the Council on the Budget Strategy for 2025/2026 to 2027/2028 
2. Recommendation(s)
2.1. The Council is asked to approve the following recommendation(s):- 
(1) that the Revenue Budget position for 2025/2026 to 2027/2028 (detailed in
section 4, Table 1) is a Budget Gap of £77.275 million, be approved;
(2) that the Transformational Change Programme detailed in Section 5, be noted;
(3) that the Summary and Next Steps at section 6, including the Timeline provided
in Table 2, be noted;
(4) that a Reserves Strategy will be presented to Members in Autumn 2024 (section
7.4), and an update on Financial Resilience will be reported to the Risk and
Audit Scrutiny Committee in September (section 8.3), be noted; and
(5) that the risks detailed in the Other Implications Section (section 14.3), be noted. 
3. Background
3.1. A report titled Update on the Budget Strategy for 2024/2025 was presented to Council
in January 2024.  While this paper focussed on the 2024/2025 Budget particularly, it
also included a reminder of the Budget Gap in the coming years – £75.1 million across
the years 2025/2026 to 2027/2028 (refer section 4 for an update).   
3.2. The Outlook for Scottish Public Finances is not positive. The Scottish Fiscal
Commission (SFC) estimates that the overall Scottish Budget will have an average
budget gap of over 10 percent each year over the next 50 years. They believe that
these financial pressures will build as the population ages and as the cost of delivering
services increases. 
3.3. Alongside that, we know that population trends are not making things any better.  The
number of older people is expected to increase but the number of younger people is
anticipated to reduce.  Put simply, the demand for services from the older population
will increase, but the number of young people to provide those services and to pay
through their taxes for all public services, will fall. 
3.4 In short, it is anticipated that our costs will continue to increase and that our Grant
Settlements will not match those cost increases – leaving a Budget Gap.    
9
83

Page 84

3.5 A recent report prepared by Audit Scotland and released by the Accounts Commission
(Local government budgets 2024/25 | Audit Scotland) reaffirms that Scottish councils
are facing a significant gap between the money needed to deliver local services and
the money they have available.  Together, all 32 councils have a gap of £585 million
for 2024/2025. This is estimated to increase to £780 million by 2026/2027.   
3.6. The scale of the financial challenge is greater than ever.  Given the magnitude of the
Budget Gap, there requires to be a fundamental re-think of what public services in
Scotland can do moving forward.  That includes what the Council can deliver by way
of services to the public.  This will require us to reconsider the things we do as a
Council, how we do them and where we deliver them from. 
3.7. Usually at this time of the year, we turn our attention to setting the Budget Strategy for
the year ahead. However, given the financial horizon, there is a need to look at the
picture not just for the year ahead but for the medium-term.  This is the starting point
for the Medium-Term Strategy from 2025/2026 to 2027/2028.  This is the Strategy
timeframe that will be covered in this report.   
3.8. Section 4 of this report will set the scene and present a Medium-Term Strategy.  It will
look at the current Budget Gap across the coming years from 2025/2026 to 2027/2028
and will explain how this has moved since setting the Budget for 2024/2025.   
3.9. The paper will go on to discuss options to reduce the Budget Gap so that a balanced
budget can be set for each year and will include reference to Council Tax levels (Band
D and Property Numbers), and a Transformational Change Programme.     
3.10. This report will focus on the years 2025/2026 to 2027/2028, and will cover the
following: 
 Budget Strategy 2025/2026 to 2027/2028 (section 4)
 The Transformational Change Programme (section 5) 
3.11. A Summary, Next Steps and a Timeline for consideration will be provided in section 6. 
Section 7 will cover Reserves whilst section 8 will provide information in relation to the
CIPFA FM Code and Financial Resilience.   
3.12. Section 10 will note the consultation and communication process and section 11 will
acknowledge the Council’s legal obligations around how budget decisions are made.     
4. Revenue Budget Strategy Items
4.1. There are a number of items that make up the Budget Gap across 2025/2026 to
2027/2028. These include provision for increases in expenditure items which the
Council would typically face as well as anticipated movements in Government Grant
and the impact of previously adding new properties. 
4.2. These items form the normal items that we would expect to cover as budget pressures
and, also include ‘one off’ solutions from previous years that require to be reinstated.
There are also reductions to be reflected, including the use of Reserves and Property
Number increases which generate additional Council Tax Income.  These are included
in Appendix 1 and summarised in Table 1.  It is noted that there are changes to the
previous Strategy and these are summarised in section 4.4 to 4.7.  
84

Page 85

Table 1 – Summary of Budget Strategy Items 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
Pay and Pension Items (Appendix 1, para 2.1 – 2.7) 
Includes assumed pay award for teachers and non-teachers as well
as the permanent reduction in Pension Contributions in 2026/2027. 
8.820 5.609 8.079
Grant Movement (Appendix 1, para 3.1 – 3.7) 
The grant assumption into 2025/2026 is Flat Cash with an injection
into 2026/2027 and then flat cash again into 2027/2028.  This also
includes the delayed impact of new properties on grant received
because we are collecting more Council Tax from more properties. 
1.600 (3.868) 1.200
Reinstatement / Impact of Prior Year Budget Decisions (Appendix
1, para 4.1 – 4.14) 
This includes the need to reinstate budget to cover one-off savings
from previous years and the benefit of previous year decisions.   
11.515  21.100  19.700 
Contract Impacts / Other Inflation (Appx 1, para 5.1 – 5.9) 
Includes typical inflationary increases on non-domestic rates, the
secondary schools’ modernisation contract (PPP), school transport,
utilities, social care for children and families and waste. 
0.678  2.596  2.426
Revenue Consequences of Capital (Appx 1, para 6.1 – 6.2) 
This includes the revenue impact of approved capital projects. 
1.142 0.378 -
Council Tax – Property Numbers (Appendix 1, para 7.1 to 7.3)
Reflects the increase in property numbers being experienced in the
later part of 2023/2024 and a projection of a further increase into
2024/2025 and the 3 years of the Strategy. 
(1.400) (1.300) (1.000)
Total Budget Strategy Items  22.355 24.515 30.405
Total Budget Strategy Items for 2025/2026 to 2027/2028 77.275 
4.3. Table 1 shows the core Budget Strategy expenditure items and gives a Budget Gap
of £77.275 million.   
4.4. This is an increase on the previously reported Budget Gap of £75.1 million (February
2024) and is mainly attributed to the impact of decisions taken when setting the
2024/2025 Budget, recent higher than budgeted pay awards and changes in
assumptions re utilities’ pricing.  These are detailed in 4.5 to 4.7 below.   
4.5. 2024/2025 Budget Decisions:  As part of the 2024/2025 Budget Setting process
(February 2024), £2.530 million of Reserves were used on a one-off basis to meet two
approved Education Savings: EDR08 (Mentoring and Learner Journey Reserves,
£2.150 million) and M&O06 (Early Learning and Childcare Reserves, £0.380 million). 
This added £2.530 million to the Budget Strategy into 2025/2026 and is included in the
Budget Gap of £77.275 million.    
85

Page 86

4.6. Pay Awards: The increase in pay award budget required over the period of the Budget
Strategy is £3.8 million.  In the main, this increase reflects the full year impact into
2025/2026 of the estimated 2024/2025 teachers pay uplift in August 2024. It also
includes the impact of a higher base budget for pay, resulting from the 2022/2023 and
2023/2024 Pay Awards.   
4.7. Utilities: Recent information has suggested a downward trend in prices into
2024/2025. This allows us to benefit the Strategy by an estimated £2.000 million. The
Council is a member of the buying consortium who purchase wholesale energy in
advance, on behalf of ourselves and other public sector bodies.  The price indications
specifically for electricity purchased for the next couple of years indicates further price
reductions beyond that assumed for 2024/2025.  As only a small proportion of the
required units are purchased for the year 2026/2027 and 20207/2028, the benefit of
this cannot be accurately quantified however, based on what has been purchased so
far, this could be substantial.  This will be noted as a risk item (see section 14.3) and
as more wholesale units are purchased during the year, further information will be
provided to Members as part of the November 2024 Budget Strategy update. 
4.8. The Strategy includes two key assumptions in terms of Income:  Government Grant
and Council Tax.  Each is taken in turn.   
4.9. Government Grant: The grant assumption across the 3 years of the Strategy mirrors
the pattern highlighted in the Scottish Government’s Spending Review published on
31 May 2022:  it maintains the level of General Revenue Grant, Non-Domestic Rates
Income and Specific Resource Grants between 2023/2024 and 2025/2026 (flat cash),
with an amount of £100m added nationally in 2026/2027 (a share of the national £100
million is assumed).  No increase has then been assumed into 2027/2028.  An update
to the Scottish Government’s Medium Term Financial Strategy is anticipated by 20
June 2024, and was not yet available at the time of writing this report. The approach
taken is the same as the previous Budget Strategy and will be updated following
receipt of the Scottish Government’s MTFS.   
4.10. Council Tax:  Members will be aware that a lever available to the Council in managing
its overall budget position and any Budget Gap is the ability to increase Council Tax. 
Each 1% increase in Band D would generate successive amounts of £1.580 million. 
It should be noted that in arriving at the budget gap of £77.275 million, no account has
been taken of any potential increase in council tax. 
4.11. It should be noted that South Lanarkshire continues to have the lowest level of Band
D council tax in mainland Scotland at £1300.81.  The average for mainland Scotland
is £1428.36. 
5. Transformational Change
5.1. At a level of £77.275 million, the Budget Gap across the years 2025/2026 to 2027/2028
remains substantial.  To address this, consideration will be required to what services
the Council can afford to continue to deliver and how these services are provided. 
Difficult decisions will need to be made to balance the Council’s budget.  We will need
to significantly change what we deliver over the next 3 years with the focus being on
statutory services.  There will likely be areas where we will need do consider whether
we can continue to deliver services and if so, what those services will actually look
like. 
86

Page 87

5.2. In order to deliver a balanced budget, it is acknowledged that we need to have a
programme of change.  This will build on the work undertaken over many years, where
service reviews have taken place and which have fed into the savings options that
Members have considered.   A Transformational Change programme will drive
continuous improvement as well as efficiencies, and will feed into the Budget Strategy.   
5.3. The foundation of this Transformational Change Programme will be a series of Cross-
Cutting Reviews.  These Cross-Cutting Reviews are listed below along with a brief
description of what each Review will consider.  These Cross-Cutting Reviews are not
focussed on one Resource, but on Council-wide activities.   
• Charging – looking at options for full cost recovery where possible.
• Procurement – further consideration of procurement practices/options.
• Overtime – Personnel led review of overtime practices and spend.
• Management Structure – Personnel led review to ensure correct balance
between management and the staff they oversee.  
• Digital Transformation / Customer Contact – a review of the use of technology
will impact on all Reviews, and will focus on how the Council and its customers
interact.
• Property – looking at our Corporate footprint with a focus on the need to right size
our use of property which will be key if we are to look to meet Net Zero targets
(section 5.4).
• Consideration of in-house and procured services. 
• Loans Fund – consideration of any further benefits that can be realised through
Loans Fund accounting.
• Depot Rationalisation – a review of the use/users of the deports, with a view to
rationalising the number across Resources/Services.   
• Fleet Reduction – looking at the number of vehicles used by Resources, and
reducing this where efficiencies can be identified.   
5.4. Property Review:  The Council owns and manages a vast estate of properties.  There
are challenging targets around moving to Net Zero and the Council is looking at how
we can progress towards this.  The Review to look at the Council’s use of property will
be far reaching, covering all Resources and South Lanarkshire Leisure and Culture,
and all areas of Service delivery.  The condition, running costs, quality, performance,
location, and use of Council assets will all be considered.  The challenge is to consider
the right portfolio of buildings, creating an affordable, efficient, fit-for-purpose and
sustainable core estate that supports the move to net zero, improves service quality,
is people centred and is service driven.  The cost of achieving the Net Zero targets is
significant and there is no additional funding being made available for this at this point
in time.   
5.5. All buildings will be reviewed for co-location opportunities with a view to being multi-
functional, flexible, and adaptable to meet the combined needs of services and service
users and promote joint working.  This is likely to reduce the number of properties the
Council has.  Where practical, the location of assets will reflect the principles of the
20-minute neighbourhood, and provide the right properties, in the right place, to meet
current and future service needs. 
5.6. These Cross-Cutting Reviews will start in 2024/2025, and it is anticipated that they will
deliver savings across the term of this Budget Strategy, 2025/2026 to 2027/2028.   
87

Page 88

5.7. It is intended that the progress on each Cross-Cutting Review will be presented to the
Performance and Review Scrutiny Forum (PRSF).  Any Review that requires approval,
will then be presented to Committee.   
5.8. Alongside the Cross-Cutting Reviews, Resources are considering their own Service
areas, and a programme of Reviews will also take place to inform savings for the
coming year.  As these Resource Reviews progress, proposals will be presented to
Members for approval as part of the Budget setting process.   
6. Summary and Next Steps 
6.1. As detailed in Table 1, the Council’s Budget gap over the years 2025/2026 to
2027/2028 is £77.275 million.  This Budget Gap is based on the assumptions and
estimates included in section 4.  Officers will continue to refine these budget estimates
over the coming months, and we will provide updates to Members in future reports.   
6.2. The magnitude of the Budget Gap is considerable and will require reconsideration of
what the Council does for its communities, as well as potentially difficult decisions.   
6.3. As noted in section 5, a Transformational Change Programme is key to continuous
improvement and the delivery of efficiencies which will reduce the Budget Gap over
the 3 years of the Budget Strategy.   The foundation of this Transformational Change
programme is a series of Cross-Cutting Reviews (listed in section 5.3) which will focus
on Council-wide activities and which will report to the PRSF and onto Committee
where appropriate. 
6.4. Alongside the Cross-Cutting Reviews, Resources are also considering their own
Service areas, and a programme of Reviews will also take place to inform savings for
the coming year.  As these progress, proposals will be presented to Members for
approval as part of the Budget setting process. 
6.5. Timeline:  A proposed timeline for the Budget process, commencing with this refresh
of the Budget Strategy, is detailed in Table 2. 
Table 2 – Proposed Timeline 
Timeline
Present Refreshed Budget Strategy for 2025/2026 to
2027/2028 to Members 
26 June 2024
(Executive Committee)
Members Seminar  August 2024
Budget Consultation September 24 –
February 25
Budget Update Paper for Committee    End November 2024
Receive Local Government Settlement for 2025/2026  End December 2024
Update the Budget Strategy for Members (post Settlement)  January 2025
Set Council Budget for 2025/2026 and Strategy for
2026/2027 and 2027/2028
February 2025 
6.6.  Reinstatement of Temporary Funding:  The Budget Strategy across the years
2025/2026 to 2027/2028 includes a number of solutions which are temporary in nature
and will require to be re-instated in future years of the Strategy period.    
88

Page 89

6.7. Table 3 shows the year of reinstatement.  Importantly, as the reinstatements fall within
the years 2026/2027 and 2027/2028, then they are included in the Budget Gap of
£77.275 million noted in Table 1 and section 4.3.   
Table 3:  Temporary Solutions 
Year of Adjustment
2026 /
2027
£m
2027 /
2028
£m
2028 / 
2029
£m
2025/2026 Corporate Solutions   
Service Concessions 
One-off use of Reserves (2025/2026)
Reinstated into 2026/2027
(Executive Committee, November 2022) 
15.100  -  -
Reduction in Employers’ Pension
Contribution
Reinstated into 2026/2027
(Executive Committee, November 2023) 
Offset by further use of Reserves in 2026/2027
(reinstated in 2027/2028) 
23.500 
(17.700) 
-
17.700 
-
2024/2025 to 2026/2027 Solutions   
Use of 2023/2024 Probable Outturn Monies
£6.000 million used across 2024/2025 to
2026/2027 at £2.000 million per annum
(Executive Committee, November 2023) 
- 2.000  -
Reduction in LVJB Requisition
Reinstatement in 2027/2028 of temporary
reduction.
- 0.200 -
Total Temporary Solutions 20.900 19.900 - 
6.8. Table 3 shows the requirement to reinstate budget of £15.100 million in 2026/2027
following the use of the remaining reserves from Service Concessions in 2025/2026. 
Table 3 also shows that there is a requirement to reinstate budget of £23.500 million
in 2026/2027 following the use of Reserves resulting from the reduction in Employers
Pension Contributions in 2025/2026, but this is offset by a further use of Reserves
(£17.700 million).  This is then reinstated into 2027/2028.  Finally, the table shows the
requirement to reinstate £2.000 million in 2027/2028 to reflect the use of £2.000 million
each year from 2024/2025 to 2026/2027, and £0.200 million in 2027/2028 for the
temporary reduction in LVJB Requisition payments. 
6.9. Table 3 shows that the last year of reinstatement is 2027/2028 – there is no
requirement to reinstate temporary solutions beyond the period of this financial
strategy.   
7. Reserves – Future Strategy
7.1. As part of a budget strategy, it can be good practice to include a Reserves strategy.  
Councils can hold reserves for a number of reasons.  Some reserves are earmarked
for identified expenditure which will, or may occur over the short, medium or longer
term.  In addition to these reserves, there are Uncommitted Reserves which help
manage unforeseen circumstances.  
89

Page 90

7.2. The Local Authority Accounting Panel (LAAP) provide guidance to the Council’s
Section 95 Officer (the Executive Director of Finance and Corporate Resources), on
the establishment and maintenance of local authority reserves and balances.  The
LAAP Bulletin does not prescribe a minimum level of reserves which should be held
by a council.  It is for the Council to consider an appropriate level of reserves taking
cognisance of strategic, operational and financial risks facing the authority at a local
level.  It does however say that Reserves should not be held without a clear purpose.   
7.3. Based on the guidance above, Local Authorities, on the advice of the Chief Finance
Officer, should make their own judgements taking into account local circumstances.  It
is therefore the responsibility of the Executive Director, Finance and Corporate
Resources to advise the Council of the level of reserves it should hold and to ensure
that their use is properly controlled. 
7.4. It is proposed that a Reserves Strategy is presented to the Finance and Corporate
Resources Committee in Autumn 2024, following completion of the Annual Accounts
for 2023/2024.   
8. Financial Management and Resilience 
8.1. The Chartered Institute of Finance and Public Accountancy (CIPFA) introduced a
Financial Management Code (the FM Code) for implementation by 31 March 2021. 
The FM Code provides “guidance for good and sustainable financial management in
local authorities. By complying with the principles and standards within the code,
authorities will be able to demonstrate their financial sustainability”. A key goal of the
FM Code is to improve and evidence the financial resilience of organisations by
embedding enhanced standards of financial management. 
8.2. In last year’s Annual Audit Report, it was acknowledged that given the scale of the
challenges there is an opportunity to enhance focus on financial resilience, including
greater emphasis on reserves, clear financial resilience indicators and measures, and
alignment to risks ensuring there is a clear financial strategy to support a resilient
council. 
8.3. Through consideration of the level of reserves, and the financial planning and
management shown in the Budget Strategy, the Council already demonstrates it has
an understanding of the Budget pressures it faces and that it mitigates as far as
possible against unforeseen costs and pressures.  A fuller report on resilience will be
presented to the Risk and Audit Scrutiny Committee in September. 
9. Communications, Engagement with Elected Members and Public Consultation
9.1. The financial challenges being faced by the Council and the operational changes that
transformational change will bring mean that clear communication is essential. The
communication and consultation process for the 2024/2025 Budget worked well, and
we would look to build on that work to ensure the Council’s financial challenges are
understood. 
10. Equalities – Protection Against Legal Challenge
10.1. When making decisions, there are a number of considerations and processes which
we must complete to assess the implications of those decisions. Officers will undertake
all necessary assessments, and these will be shared with members before any budget
decisions are made. 
11. Employee Implications
11.1. There are no direct employee implications from this report. 
90

Page 91

12. Financial Implications
12.1. The financial implications are summarised within the report. 
13. Climate Change, Sustainability and Environmental Implications
13.1. As part of the budget process, an environmental impact assessment of any decisions
taken in relation to the budget will be carried out.  This assessment will be updated as
the budget process continues and at this stage members are not being asked to
approve the budget. Elements feeding into this current budget strategy are anticipated
to reflect increases in cost of current activity, rather than any change to existing
practices and therefore should have no direct environmental impact change as a
result.  This will be considered in the relevant Sustainability Impact Assessments. 
13.2. Climate Change targets will have an impact on the Council’s future financial strategies. 
This will be included in future Budget Strategy papers as appropriate. 
14. Other Implications
14.1. The financial strategy is a way of managing a number of key risks which directly impact
on the money available to deliver Council objectives.  As detailed in the report, there
is no certainty on the level of funding that will be received over the life of this Strategy.
This Strategy is based on economic information and advice we have to date.  However,
it is accepted that these are assumptions. 
14.2. The main risk area, where the Council has made assumptions which have a significant
impact on the budget estimates going forwards, are on the level of grant which we will
receive, as well as any general pay, demand or price increases / inflation assumptions
currently unknown.  These have been estimated, as far as possible.  Also, the level of
new build properties and, therefore, Council Tax Income generation is based on best
information at the time of writing.  Any movement in these assumptions would be a
risk to the Strategy. 
14.3. Specific risks for the budget are: 
 Pay Awards:  The Strategy includes an assumption for both teaching and non-
teaching staff in 2025/2026 and beyond, as well as the full year effect of an
estimated Teachers’ Pay Award from August 2024 (into 2025/2026). The pay
deal for non-Teachers is set for 2023/2024 only and there has been no
agreement of what the pay award will be beyond financial year 2023/2024.  For
teaching staff, there is no pay deal beyond August 2024.  This is therefore a risk
to the financial Strategy.   
 In addition, while the 2024/2025 budget includes an estimated pay award for both
groups of staff for that year, the fact that the 2024/2025 pay award is itself not
agreed, means that depending on the level agreed, there is a risk that there could
also be an impact into 2025/2026.     
 Children and Families: Pressures associated mainly with external placements
have been reported.  The current estimated pressure that will be managed on a
temporary basis in 2024/2025 is £10.6 million. The Service has an approved
budget recovery plan in place with the identification of next steps options to
further bring spend in line with budget.  This includes the commissioning of new
Intensive Family Support Services to address high-cost residential placements,
ongoing reviews of policies and procedures, service reviews and a review and
update of contracts.  Updates will be provided to Social Work Resources
Committee during 2024/2025.    
91

Page 92

 Utilities:  As noted in section 5.6, there is a downward trend in the price for
utilities, specifically electricity.  Account has been taken of the impact into
2025/2026 for the known purchase of units for 2024/2025.  However, there has
been no account taken of any future price reductions beyond 2024/2025 due to
the relatively small amount of energy purchased for the years 2025/2026 and
2026/2027.  Based on what has been purchased so far, the benefit to the Strategy
could be substantial.  This will continue to be monitored as further purchases are
made during the year.  Information will be provided to Members as part of the
November 2024 Budget Strategy update. 
 Insurance:  The Council operates an Insurance Fund to manage claims and
liabilities arising from normal business.  An amount has been included in the
Budget Strategy to allow the Fund to balance on an annual basis, however, this
may be insufficient if the level of claims experienced increases.   
 Teachers’ Pension: The Council’s contribution rate into 2024/2025 has
increased from 23% to 26% as of 1 April 2024.  No funding has been received to
date however, it is anticipated to be forthcoming as a result of Budget
Consequentials from the UK Government.  Scottish Government have committed
to passing over funds as they receive them. 
 Persistent Ongoing Pollutants (POPs): Scottish Government Legislation
enacted in February 2024 has meant additional costs to the Council estimated at
£0.500 million per annum.  This has not been assumed in the Budget Strategy
as funding is expected to follow the legislative requirements.  COSLA are
lobbying the Scottish Government for funding. 
 Net Zero / Property:  The Council owns and manages a vast estate of properties. 
There are challenging targets around moving to Net Zero and the Council is
looking at how we can progress towards this. There are significant cost
implications associated with the Net Zero targets and no new funding at this point. 
There are risks to our ability to achieve these targets without funding, therefore
in order to work towards achieving these targets, we need to consider what our
property estate will look like going forwards.   
14.4. Job Evaluations: As part of normal council processes, Job Evaluation exercises
continue across a number of services, and at the time of writing this paper there are
currently 2 reviews at appeal stage which, if successful, may have financial
implications on recurring costs for the council.   Any back pay implications would be
dependent on the outcome of these appeals.  If all appeals were successful, the costs
of back pay could be significant however at this point in time no funding has been
included for these costs given the outcome of the appeals are not known and that the
original outcome of the Job Evaluations concluded that there was no change to
grade.  These outcomes from these current appeals are expected to be known by
August 2024.   
14.5. Level of Support Provided to the Integration Joint Board (IJB) and South
Lanarkshire Leisure and Culture SCIO (SLLC):  The Council’s Budget Strategy for
2025/2026 to 2027/2028 at this stage assumes no additional allocation of monies from
the Council to the IJB or SLLC.  It is for the IJB and SLLC to produce their own
balanced budgets.    
92

Page 93

15. Equality Impact Assessment and Consultation Arrangements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
15.2. There is no requirement to undertake any consultation in terms of the information
contained in this report.  However, as the progress of Transformational Change
Programme and the identification of savings continues, proposals will be presented to
Members later in the year and stakeholder consultation and equality impact
assessments will be carried out.  The results will be provided to members to inform
their decision-making process. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council - 21 February 2024   
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Jackie Taylor, Executive Director, Finance and Corporate Resources 
Ext:  4637 (Tel:  01698 454637)
E-mail : jackie.taylor@southlanarkshire.gov.uk
93

Page 94

Appendix 1 
2024/2025 to 2027/228 Budget Strategy: 
Budget Strategy Items 
This Appendix details the Budget Strategy Items included in the 2025/2026 to 2027/2028
Budget Strategy (Table 1 of main report).    
1. Budget Strategy Expenditure Assumptions 
1.1. In arriving at the expenditure assumptions, a number of factors are taken into
account including the reinstatement of previous year solutions, demographics,
economic conditions and ongoing commitments of the capital programme.  These
are each taken in turn with the high-level figures quoted covering the 3 years from
2025/2026 to 2027/2028. 
2. Pay Items (net cost of £22.508 million)
2.1. Pay Award (inc. Apprenticeship Levy): An assumption had been made regarding
the potential increase for both teaching and non-teaching staff beyond 2024/2025, as
well as the full year effect of an estimated Teachers’ Pay Award from August 2024
(into 2025/2026).  Taking account of the reinstatement of a higher level of Pension
contributions for non-teaching staff from 2026/2027 (after the reduction in years
2024/2025 and 2025/2026), the Pay Award requirements across the 3 years are
estimated at a cost of £8.820 million into 2025/2026, £8.909 million into 2026/2027,
and £8.079 million into 2027/2028. 
2.2. The pay deal for Non-Teachers is set for 2023/2024 only.  There has been no
agreement of what the pay award will be beyond financial year 2023/2024.  For
teaching staff, there is no pay deal beyond August 2024.   
2.3. These assumptions will be updated as more information becomes available.  This
excludes pay award for the Integrated Joint Board and the South Lanarkshire
Leisure and Culture SCIO. 
2.4. As noted above, the pay award for 2024/2025 is not yet settled for either group of
staff.  While the 2024/2025 budget includes an estimate for these awards, depending
on the award agreed, there is a risk that there could be an impact into 2025/2026.     
2.5. Local Government Pension Scheme:  The last actuarial review carried out on the
Strathclyde Pension Fund (March 2020) resulted in reduction in Pension
Contributions from the previous 19.5% down to 6.5% for the years 2024/2025 and
2025/2026.  It will then rise back up to 17% from 2027/2028.  The impact of this was
reported to members as part of the  2024/2025 Revenue Budget and Savings
Proposals which detailed the use of the temporary benefit in reduced contributions
for the first 2 years (refer section 4.9), and the permanent reduction of £3.3 million
accounted for in 2026/2027.   
2.6. Teachers’ Pension Scheme:  The latest actuarial valuation of the Teachers’
Pension Scheme resulted in an increase in Pension Contributions from 1 April 2024. 
The previous 23% of Pensionable Pay was increased to 26%.  The full year cost to
the Council in 2024/2025 is £5.5 million.  This was not assumed in the 2024/2025
Budget Strategy however, the Scottish Government expect to receive funding for this
from the UK Government, and have committed to passing this on to councils.   
94

Page 95

2.7. The total cost impact of the Pay Items on the 2025/2026 to 2027/2028 Strategy is
£22.508 million. 
3. Government Grant (net benefit of £1.068 million)
3.1. Local Government budgets are affected by both changes in the UK Government
Budget and the subsequent Scottish Government Budget. 
3.2. The Scottish Governments Medium Term Financial Strategy (MTFS) which was
published in May 2022, maintained the level of funding for Local Government at flat
cash levels between 2023/2024 and 2025/2026, with an amount of £100m added
nationally in 2026/2027.  A further MTFS was published in late May 2023.  That
Strategy pointed towards significant budget gaps within the Scottish budget with
solutions still to be found.  Therefore, despite suggestions within the MTFS of
inflationary increases for Local Government, at this stage, given the budget gap
faced by the Scottish Government, it would be premature to assume the actual
Settlement for South Lanarkshire would increase.  A Flat Cash Government Grant
position has therefore been assumed into 2025/2026 with a proportionate increase
of £5.868 million into 2026/2027 (the Council’s usual share of the national £100
million), and then Flat Cash into 2027/2028.  The next MTFS to be published by the
Scottish Government is due by 20 June 2024 and was not available at the time of
writing.   
3.3. Consequence of Council Tax Increases on Grant (Properties): As noted in
previous Budget Strategies, increases in Council Tax due to increased property
numbers, does not give a permanent benefit to the Council as there will be a
reduction in Government Grant in future years – an estimated 80% Grant Reduction
for every additional £1 of Council Tax. 
3.4. The impact on grant of additional properties is incurred 2 years after the new
properties are built.  In relation to 2025/2026 to 2027/2028, the consequent reduction
in Government Grant (80% reduction after 2 years) reflects the new properties added
in 2023/2024 to 2025/2026 and totals an estimated reduction in Grant Income of
£1.600 million for 2025/2026, £2.000 million for 2026/2027, and £1.200 million for
2027/2028. 
3.5. In addition, there may also be changes in how grant is distributed to councils, based
on their share of population numbers. 
3.6. In previous years, the Council has experienced both increases and decreases in
grant as a result of the funding quantum and the way in which the funding is
distributed.  Movement in grant is wholly dependent on the distribution methodology
used.  It is proposed that the prudent approach is to not assume any grant increase
due to population changes, and that if there is new money, it is likely this will have a
policy intent attached and therefore no impact to the Council’s Budget Gap.   
3.7. The total positive impact of Government Grant changes on the 2025/2026 to
2027/2028 Strategy is £1.068 million. 
4. Reinstatement / Impact of Prior Year Budget Decisions (£52.315 million)
4.1. A number of budget strategy solutions approved for the previous year budgets were
temporary in nature.  These must be re-instated into 2025/2026, 2026/2027 and
2027/2028.  These are taken in turn below and summarised in Table A. 
95

Page 96

4.2. Spend to Save:  The 2021/2022 Budget Strategy agreed that Capital money could
be used to support the purchase of previously leased vehicles, therefore reducing
the cost to the Revenue Budget and benefitting the Strategy for the next 3 years.  As
these assets now need replaced, and will be replaced by new lease arrangements,
then the Revenue Budget must be reinstated 2025/2026 at a cost of £1.8 million.   
4.3. Lanarkshire Valuation Joint Board Requisition Payments:  Over the 3 year
period, there is a need to reinstate two amounts of money in relation to temporary
requisition payment savings in respect of the Council’s funding of the Joint Board. 
These monies are required as follows:  £0.085 million in 2025/2026 and £0.200
million in 2026/2027. 
4.4. 2023/2024 Underspend:  In the 2024/2025 Revenue Budget and Savings report to
Executive Committee (November 2023), it was agreed that an underspend of £6.000
million would be used to support the Strategy with £2.000 million in each year over
the period 2024/2025 to 2026/2027.  This temporary solution needs to be reinstated
into 2027/2028 at a cost of £2.000 million. 
4.5. Loans Fund Review:  The Budget Strategy for 2024/2025 included the use of
Reserves generated from the Loans Fund Review.  The £14.000 million used
temporarily in 2024/2025 requires to be re-instated into 2025/2026.  This adds
£14.000 million to the budget strategy in 2025/2026 only. 
4.6. Interest on Loan Charges:  As detailed to members in June 2020, implementation
of the Loans Fund Review (and its significant up-front benefits) means that additional
interest costs will be incurred as a result of paying back the debt over a longer period
of time.  It was noted that future budget strategies would need to include incremental
increases to meet these costs and that the requirement of £1.746 million would be
added incrementally to the Loans Fund budget from 2022/2023.  As a result, £0.200
million requires to be added to the 2025/2026 Strategy only.   
4.7. Service Concessions: Implementation of the Service Concessions accounting
arrangements has meant a retrospective benefit in the form of available Reserves to
support the budget over three years.  The £27.500 million used temporarily in the
2024/2025 Budget Strategy requires to be re-instated into 2025/2026 but will be
offset by the planned use of Service Concession Reserves in that year (£15.100
million). This adds a net £12.400 million to the 2025/2026 Budget Strategy.   
4.8. Similarly, the £15.100 million used temporarily in 2025/2026 requires to be re-
instated into 2026/2027.  This adds £15.100 million to the Budget Strategy in
2026/2027 only. 
4.9. 2024/2025 Savings Funded by Reserves:  Decisions taken as part of the Budget
Setting process for 2024/2025 had an impact on the future year Budget Gap. 
Specifically, one-off use of £2.530 million of Reserves to meet two approved
Education Savings:  EDR08 (Mentoring and Learner Journey Reserves, £2.150
million) and M&O06 (Early Learning and Childcare Reserves, £0.380 million).  This
adds £2.530 million to the Budget Strategy in 2025/2026 only.  
96

Page 97

4.10. Reduction in Pension Contributions: As noted in section 2.5, the Council’s Budget
will benefit from a reduction in Pension Contributions from the previous 19.5% down
to 6.5% for the years 2024/2025 and 2025/2026.  It was agreed as part of the
2024/2025 Revenue Budget and Savings Proposals report to members that the in-
year underspends totalling an estimated £45.200 million would be transferred to
Reserves, and used to support the Budget Strategy in years 2024/2025 to
2026/2027.   
4.11. The £4.000 million that temporarily benefitted the 2024/2025 Budget Strategy
requires to be re-instated into 2025/2026 but will be offset by the planned use of
Pension Contribution Reserves in that year (£23.500 million). This benefits the
2025/2026 Budget Strategy by a £19.500 million. 
4.12. Similarly, the £23.500 million used temporarily in 2025/2026 requires to be re-
instated into 2026/2027 but will be offset by the planned use of Pension Contribution
Reserves in that year (£17.700 million). This adds a net cost of £5.800 million to the
2026/2027 Budget Strategy.   
4.13. Finally, the planned use of Pension Contribution Reserves in 2026/2027 needs to be
reinstated in 2027/2028.  This adds £17.700 million of costs to the Budget Strategy
in 2027/2028 only. 
4.14. The total impact of Reinstatements / Prior Year Budget Decisions on the 2025/2026
to 2027/2028 Strategy is £52.315 million.  These are summarised in Table A. 
Table A – Reinstatement / Prior Year Budget Decisions 
2025 /
2026
£m
2026 /
2027
£m
2027 /
2028
£m
The Loans Fund Review impact of using one-off Reserves in
2024/2025 (£14.000 million) reinstated in 2025/2026 (2021/2022
Budget Report to Council, 24 June 2020).
14.000  -  -
£0.200 million additional Loan Charges Budget as a result of the
Loans Fund Review (Council, June 2020).
0.200  - -
£2.530m use of Reserves to make 2024/2025 Savings (Council
meeting, February 2023).
2.530  - -
Service Concessions – net impact of using one-off reserves each
year, reinstated the next.  Reinstatement offset by further use of
reserves until completion in 2026/2027.  (Executive Committee,
November 2022)
12.400  15.100  - 
Pension Contribution Reserves – net impact of using one-off reserves
each year, reinstated the next.  Reinstatement offset by further use of
reserves until completion in 2027/2028 (2024/2025 Revenue Budget
and Savings report to Executive Committee, November 2023).
(19.500)  5.800  17.700 
Reinstate budget required following the temporary reduction in
requisition payments to the Valuation Joint Board.  
0.085  0.200  -
Reinstate budget for previous Spend to Dave exercise to reflect
revenue budget required for lease payments.
1.800  - -
Previous use of 2023/2024 underspend used for the 3 years to
2026/2027, reinstated in 2027/2028 (2024/2025 Revenue Budget and
Savings report to Executive Committee, November 2023).
- - 2.000
Total 11.515 21.100 19.700 
97

Page 98

5. Contract Impacts / Other Inflation (£7.700 million)
5.1. Education - Secondary Schools’ Modernisation Contract / School Transport: 
An allocation of £1.200 million has been added to the Budget Strategy for each of
the three years 2025/2026 to 2027/2028 (total £3.600 million).  In previous years,
the allocation of anticipated inflationary increases was made to the Secondary
Schools Modernisation Contract only, however it is proposed that given the
pressures resulting from school transport costs, £0.900 million per annum is
allocated to the Schools Modernisation Contract and £0.300 million per annum is
allocated to help manage inflation on School Transport contracts.   
5.2. Non-Domestic Rates: The 2024/2025 Budget Strategy included an allocation for to
accommodate the impact of property revaluation and rate poundage increases into
20204/2025.  It is likely that the poundage will increase into 2025/2026 and beyond,
however any impact would be the result of Scottish Government changes to
bandings and these are not available until the Local Government Settlement is
issued later in the calendar year.  In order to prepare for the change in poundage, an
inflationary increase is included, similar to previous increases experienced.  This
would add £0.460 million to the Budget Strategy for 2025/2026, £0.469 million for
2026/2027 and 0.479 million for 2027/2028. 
5.3. Waste:  The Council has a number of significant contracts for waste collection and
disposal.  Taking account of estimated inflationary increases each year, as well as
£0.150 million pa to allow the service to manage the increasing number of
properties, the following is included in the Budget Strategy for the next 3 years: 
£0.518 million, £0.527 million and £0.547 million respectively.   
5.4. Social Care: In previous years, the Strategy assumed increases in prices reflecting
the ongoing commitments for Children and Families Social Care contracts held by
the Council (excluding Adults and Older People contracts).  Given the work being
carried out to review the overall costs included in Children and Families, it is
assumed that this Service will be back on budget, and an inflationary increase only is
required.  This equates to £0.200 million for each year into 2025/2026, 2026/2027
and 2027/2028 (total £0.600 million).   
5.5. Strathclyde Passenger Transport:  In previous years, SPT had adjusted their
requisitions to reflect the movement in the local government grant to councils.  The
Strategy for 2024/2025 assumes no change in the requisition payment, reflecting the
assumption that there will be no change in grant levels.  This will be updated as
more information becomes available.   
5.6. Insurance Fund:  The Council’s Insurance Fund is projecting an annual shortfall
from 2025/2026 and a budget increase of £0.300 million is required in that year and
£0.200 million into 2026/2027.  This includes a small annual allowance for pre-fund
liabilities. 
5.7. Utilities: Recent information has suggested a downward trend in utility prices into
2024/2025.  The Council is a member of the buying consortium who purchase
wholesale energy in advance, on behalf of public sector bodies in Scotland.  The
price indications for electricity specifically purchased beyond 2024/2025, indicate
further price reductions, however, as only a small proportion of the required units are
purchased, the benefit of this cannot be accurately quantified.  As further wholesale
units are purchased during the year, this should become clearer.  Information will be
provided to Members in the Strategy Update in November 2024.    
98

Page 99

5.8. The Council can take advantage of these price reductions to offset some of the
Strategy pressures detailed in this appendix (Appendix 1).  The estimated Budget
reduction based on best information at the time of writing, is a benefit of £2.000
million in 2025/2026. 
5.9. The total impact of Contract / Other Inflation on the 2025/2026 to 2027/2028 Strategy
is £5.700 million. 
6. Revenue Consequences of Capital (£1.520 million)
6.1. The assumptions in this Strategy continue to include provision for the revenue
consequences of the opening/extension of new primary schools and other approved
capital projects including Our Lady of Lourdes, the full year cost of the new Jackton
Primary school, and the expansion of 4 secondary schools (Calderside Academy,
Holy Cross High School, St Andrew’s and St Bride’s High School and Uddingston
Grammar).   
6.2. The impact across the years is £1.142 million in 2025/2026 and £0.378 million in
2026/2027 (totalling £1.520 million across the years of the Strategy).   
7. Council Tax Properties (£3.700 million)
7.1. The South Lanarkshire Housing Land Audit (2023) details new houses anticipated in
2024/2025 and beyond.  Based on Band D properties and net of Council Tax
Reduction Scheme (CTRS), the increase in Council Tax Income for 2025/2026 has
been assumed at (£1.400 million) (Council Tax less CTRS).  This reflects the full
year implication of new build houses experienced in 2024/2025 and an estimate for
2025/2026. 
7.2. Moving into 2026/2027 and 2027/2028, the Land Audit suggests further new
properties in excess of 1,000 pa.  Again, assuming Council Tax Band D, this is
estimated to would generate net income of £1.300 million for 2026/2027 and £1.000
million for 2027/2028. 
7.3. While there remains a risk that development will not progress as originally
anticipated, housebuilding continues to progress in sites across the Council area. 
The position will continue to be monitored during 2024/2025.  The impact of new
houses on the Government Grant is detailed in Appendix 1, section 3.3. 
8. Total Budget Strategy Items (2025/2026 to 2027/2028):  The total of these items is
£77.275 million. 
99

Page 100

100

Page 101

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: South Lanarkshire Council Armed Forces Community
Covenant Strategy 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval for a new Armed Forces Community Covenant Strategy which
builds on the Council’s work carried out to date supporting the Armed Forces
Community Covenant and the statutory Armed Forces Covenant Duty 
 seek approval on the Armed Forces Community Covenant Strategy Action Plan
to implement the Strategy
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Council’s Armed Forces Community Covenant Strategy be approved;
(2) that the Armed Forces Community Covenant Strategy Action Plan for the
period 2024 – 2027 be approved;
(3) that it be noted an annual report on the Council’s work in promoting the Armed
Forces Community Covenant will be reported to South Lanarkshire Council in
January 2025. 
3. Background
3.1. Previous reports were presented to South Lanarkshire Council on 26 June 2019 -
Support For Veterans and 31 January 2024 - Armed Forces Community Covenant
Duty.  These respectively detailed:- 
 the range of supports provided to Veterans and their families in South
Lanarkshire 
 the support that may be developed through the work of the Council working
with partners on the Lanarkshire Firm Base including assessing the
arrangements that other Scottish Local Authorities have in place 
 an update on the creation of a guaranteed interview scheme for ex-armed
forces personnel, this was a motion agreed by the Council on 19 December
2018
 an update on the Armed Forces Covenant Duty (the Covenant Duty), a legal
duty introduced by the Armed Forces Act 2021 which came into effect on 22
November 2022
 the annual report on employment of veterans
 the Local Authority Armed Forces and Veterans Champion Role Description 
10
101

Page 102

3.2. The Council signed up to the Armed Forces Community Covenant with a range of
partners from the NHS, the Military and voluntary and charity sectors on 5 March
2012, this document was signed by the Leader and Chief Executive on behalf of the
Council. 
3.3. The original covenant document was set up as a statement of mutual support
between the civilian community and its local Armed Forces Community.  This was
intended to complement the Armed Forces Covenant, which outlined the moral
obligation between the Nation, the Government, and the Armed Forces at a local
level. 
3.4. The specific aims of the Armed Forces Community Covenant were to: 
 encourage local communities to support the armed forces community in their
areas 
 nurture public understanding and awareness amongst the public of issues
affecting the armed forces community 
 recognise and remember the sacrifices made by the armed forces community 
 encourage activities which help to integrate the armed forces community into
local life 
 encourage the armed forces community to help and support the wider
community, whether through participation in events and joint projects, or other
forms of engagement 
3.5.  A local group was set up under the co-ordination of the Army originally entitled the
Lanarkshire Firm Base and now renamed the Lanarkshire Armed Forces Community
and Veterans Covenant Group which brought together a range of organisations
including North and South Lanarkshire Councils, the NHS, the Military, voluntary
sector groups, appropriate charitable organisations and other Community Planning
partners to work together to improve services and support to local veterans and their
families by progressing the terms of the Covenant. 
3.6.  To underline and raise awareness of the Covenant, the Council recommitted to the
Armed Forces Community Covenant by signing an updated version of the Covenant
document at the Council’s Armed Forces Day Flag Raising Event on 23 June 2018. 
3.7. As reported to the Council on 31 January 2024, the Armed Forces Act 2021 further
established the commitments in the Covenant, with the creation of the statutory
Armed Forces Covenant Duty. As reported at Council, the new Covenant duty,
requires organisations delivering local services to pay ‘due regard’ to the Covenant
principles when exercising functions in the areas of housing, education, and
healthcare. ‘Due regard’ means informed decision making and means that the
Council should think about and place appropriate weight on the principles of the
Covenant when they consider factors relevant to how they conduct functions which
fall within the scope of the Covenant, the principles that need to be considered
being:- 
• the unique obligations of, and sacrifices made by, the armed forces;
• the principle that it is desirable to remove disadvantages arising for service
personnel from membership, or former membership, of the armed forces; and
• the principle that special provision for service personnel may be justified by the
effects on such people of membership, or former membership, of the armed
forces. 
102

Page 103

4.  Current Position
4.1.  The Armed Forces Covenant Duty does not mandate what organisations must do,
only that they must consider the Armed Forces community alongside other legal
requirements. It means that decisions about the development and delivery of certain
services must be made with conscious consideration of the needs of the Armed
Forces community. 
4.2.  Further to this, officers have now developed the South Lanarkshire Council Armed
Forces Community Covenant Strategy for 2024 – 2027, aligned to the Council
Connect Plan. 
4.3. Council Officers have consulted with members of the Lanarkshire Armed Forces
Community and Veterans Covenant Group, including the Council’s Armed Forces
Champion, in developing the Strategy which is attached as Appendix 1 to this report,
and which the Committee is asked to approve. 
4.4 The Council Strategy is aligned to the Lanarkshire Armed Forces Community and
Veterans Covenant Group Handbook, link detailed below, which was prepared and
published through the Lanarkshire Armed Forces Community and Veterans
Covenant Group. 
CC_2023_00572 Lanarkshire Armed Forces booklet.pdf (northlanarkshire.gov.uk) 
4.5  The Duty and the implementation of this Strategy means that the Armed Forces
community will receive a fair assessment when their cases are considered. In
particular, the following Council services areas are covered by the Act:- 
Housing and Technical Resources:- 
 Allocations policy for social housing 
 Homelessness 
 Disabled Facilities Grants 
Education Resources:- 
 Admissions 
 Educational attainment and curriculum 
 Child wellbeing 
 Transport 
 Attendance 
 Additional needs support 
Health and Social Care 
 Local authority delivered health and social care services, including drug and  
alcohol misuse services 
 Co-operation between bodies and professionals 
4.6 The Council Action Plan, detailed at the end of the Strategy provides more
information on the work the Council will carry out to meet the requirements of the
Armed Forces Covenant Duty. 
5. Next Steps 
5.1. To publish the Strategy and advise the Lanarkshire Armed Forces Community and
Veterans Covenant Group of the Strategy.
103

Page 104

5.2. To form a cross-service officer group to drive forward delivery of the Strategy and the
Action plan. 
5.3. As part of the delivery of the action plan and implementation of the Council’s Armed
Forces Strategy to ensure that the Council continue to work towards achieving the
Gold Award status as part of the Defence Employer Recognition Scheme.   
Progress on the action plan will be included in the Annual Report. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. There are no financial implications arising from this report, any ongoing work will be
accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications arising
from the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Impact Assessment and Consultation Arrangements
10.1. An impact assessment in relation to the strategy has been undertaken. The
assessment identifies positive impact on the Veteran Community. On approval of the
strategy this will be published on the Council website, and is available from the Head
of Administration and Legal on request. 
10.2 The Strategy and Action Plan highlight the steps that when taken forward will help 
the Council meet the requirements of the Armed Forces Community Covenant and
the statutory Armed Forces Covenant Duty. 
10.3 The trade unions will be updated on the implementation of the Strategy going
forward. 
10.4 As noted above, Council Officers have consulted with members of the Lanarkshire
Armed Forces Community and Veterans Covenant Group, including the Council’s
Armed Forces Champion. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
17 May 2024 
Link(s) to Council Values/Priorities/Outcomes
       Accountable, effective, efficient and transparent
       Fair, open and sustainable
       Ambitious, self aware and improving
       Excellent employer
       Focused on people and their needs
       Working with and respecting others
104

Page 105

Previous References
 South Lanarkshire Council – 29 June 2019
 South Lanarkshire Council – 31 January 2024 
List of Background Papers
 Armed Forces Covenant Duty
 Statutory Guidance on the Armed Forces Covenant Duty
 South Lanarkshire Armed Forces Community Covenant Duty Report 31 January 2024
 Local Authority Armed Forces and Veterans Champion Role Description 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Iain Strachan, Head of Administration and Legal Services
Ext: 4658 (Tel: 01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk 
Michelle Milne, Head of Personnel Services
Ext: 4330 (Tel: 01698 454658)
E-mail: michelle.milne@southlanarkshire.gov.uk 
105

Page 106

106

Page 107

Appendix 1 
South Lanarkshire Council
Armed Forces Community Covenant Strategy
2024 - 2027 
10
107

Page 108

Contents
Page
3 Foreword – Councillor Mark Horsham – South Lanarkshire’s Armed 
Forces Champion
4 Background and Context
4 Aims and Vison
5 The Armed Forces Community Covenant 
5 The Armed Forces Community Covenant Principles
5 South Lanarkshire Armed Forces Community Covenant
6 About South Lanarkshire’s Armed Forces Covenant
6 Lanarkshire Armed Forces Community and Veterans Covenant Group
7 Defence Employer Recognition Scheme
8 South Lanarkshire Councils Strategy
11 South Lanarkshire Council Action Plan 
108

Page 109

Foreward
As South Lanarkshire Council’s Armed Forces Champion I am delighted that the
Council has brought forward this new Armed Forces Community Covernant Strategy.
Within South Lanarkshire we are immensely proud of our Armed Forces, and proud
to do as much as we can to support them. 
Importantly, and with the Council having been a signatory to the Armed Forces
Covenant since 2012, we very much see ourselves as supporting the wider Armed
Forces Community, being current and former Service personnel (Regular, Reserve
and National Service) and their families, that served in the Royal Navy, British Army
and Royal Air Force, as well as members of the Merchant Navy who have served on
board a commercial vessel in support of UK military operations. 
This Strategy sets out how the Council intends to uphold the principles of the
Covenant, so that the needs of the Armed Forces Community are considered in the
delivery of local services, and that we improve and strengthen the ties between that
Community and the South Lanarkshire communities in which they live and work. 
This Strategy also sets out the actions we plan to take, both ourselves and in
partnership with others, to deliver on these commitments. 
Councillor Horsham
South Lanarkshire Council Armed Forces Champion 
109

Page 110

1. Background and Context 
South Lanarkshire Council has been a signatory to the Armed Forces Covenant
since 2012 and is committed to uphold the key principles of the Covenant: 
• That no member of the Armed Forces Community should face disadvantage in the
provision of services compared with any other citizen.  
• That, in some circumstances, special treatment may be appropriate especially for
the injured or bereaved. 
The Council has developed its relationship and commitment with the armed forces
community and achieved the Defence Employer Recognition Scheme (ERS) Silver
Award. That commitment will be demonstrated through a set of corporate aims and
actions to provide assurance that it is able to deliver on that commitment. 
The Council has appointed an elected member (Cllr Mark Horsham since May 2024)
to be its Armed Forces Champion. 
2. Aims and Vision 
The Council recognises the value service personnel, reservists, veterans and military
families (together the Armed Forces Community) bring to the life of Lanarkshire and
its communities. The Council will, through this Strategy, seek to uphold the principles
of the Armed Forces Covenant by: 
• recognising the sacrifices made by the armed forces community 
• encouraging support for the armed forces community 
• promoting understanding and awareness amongst the public 
• encouraging activities to help the community integrate into local life 
• supporting veterans and service families in employment at the Council 
The Council acts in partnership with local representatives of armed forces
organisations, major charities and other local authorities and public bodies within
Lanarkshire, including NHS Lanarkshire and Citizens Advice Bureau etc. It supports
the Lanarkshire Armed Forces Community and Veterans Covenant Group, co-
chaired by the Council’s Armed Forces Champion, which includes local stakeholders. 
We will work in partnership with the Armed Forces Community to understand the
unique challenges they face and provide guidance and support so they can easily
access services that are available. 
Our aim is to support the armed forces community by ensuring that the
commitments in the Covenant are integral to our systems, processes and
policies and that staff and Members understand this commitment and apply it
in all they do within the Council and their communities. 
110

Page 111

3. The Armed Forces Community Covenant 
The Armed Forces Covenant (AFC) was published in May 2011 along with a
document called, ‘Today and Tomorrow’.  This lists the nearly 100 real, tangible
commitments the government has made to the Armed Forces Community. 
4. Armed Forces Community Covenant Principles 
The Covenants two principles are that: 
• The Armed Forces Community should not face disadvantage compared to
other citizens in the provision of public and commercial services; and 
• Special consideration is appropriate in some cases, especially for those who
have given most such as the injured and the bereaved. 
The Covenant exists to redress the disadvantages that the Armed Forces
Community may face in comparison to other citizens, and to recognise sacrifices
made. The AFC is also supported by the Corporate Covenant, which is a public
pledge from businesses and other organisations who wish to demonstrate their
support for the Armed Forces Community. Riverside signed the Corporate Covenant
in June 2014, and was the first (and to date the only) Civilian Registered Provider of
Social Housing to do so. 
5. South Lanarkshire Council Armed Forces Community Covenant 
The Council signed up to the Armed Forces Community Covenant with a range of 
partners from the NHS, the Military and voluntary and charity sectors on 5 March 2012.  
This document was signed by the Leader and Chief Executive on behalf of the Council. 
The original covenant document was set up as a statement of mutual support 
between the civilian community and its local Armed Forces Community.  This was 
intended to complement the Armed Forces Covenant, which outlined the moral 
obligation between the Nation, the Government, and the Armed Forces at a local 
level. 
The South Lanarkshire Council Armed Forces Community Covenant is a formal
statement of mutual support between the civilian community and the local armed
forces community, which is intended to complement the Armed Forces Covenant. 
This outlines the moral obligation between the nation, the government and the armed
forces. The covenant aims to raise awareness of issues affecting the armed forces
community and provide support through assisting with health and wellbeing, housing,
leisure and culture, housing and employment. 
The covenant also gives South Lanarkshire community organisations the opportunity
to bid for UK wide funding via the Armed Forces Covenant Fund Trust. 
111

Page 112

6. About South Lanarkshire’s Armed Forces Covenant 
The Council signed the community covenant – a voluntary statement of mutual
support between a civilian community and its local Armed Forces, which aims to: 
• Encourage local communities to support the Armed Forces community in their
areas.
• Nurture understanding and awareness amongst the public of issues affecting the
Armed Forces community.
• Recognise and remember the sacrifices faced by the Armed Forces community.
• Encourage activities which help to integrate the Armed Forces community into
local life.
• Encourage the Armed Forces community to help and support the wider
community, whether through participation in events and joint projects, or other
forms of engagement. 
7. Lanarkshire Armed Forces Community and Veterans Covenant Group 
A Lanarkshire wide group was previously set up under the co-ordination of the Army, 
and was called the Lanarkshire Firm Base Group, created  in partnership with North 
and South Lanarkshire Council’s following a request by the Royal Regiment of 
Scotland for an Armed Forces Covenant to be established.   
This brought together a range of organisations including North and South 
Lanarkshire Councils, NHS Lanarkshire, the Military, voluntary sector groups, 
appropriate charitable organisations and other Community Planning partners to work 
together to improve services and support to local veterans and their families by 
progressing the terms of the Covenant. 
In 2018, the Armed Forces Covenant was updated and a multi-agency approach, 
led by both North and South Lanarkshire Councils, was adopted to bring together a 
reformed Lanarkshire Firm Base Group with the overarching aim to improve the 
quality of support for veterans in Lanarkshire. Lanarkshire Firm Base was 
subsequently relaunched to provide an updated focus and ensure a coordinated 
approach to issues facing veterans and their families in Lanarkshire. 
To underline and raise awareness of the Covenant, the Council recommitted to the 
Armed Forces Community Covenant by signing an updated version of the Covenant 
document at the Council’s Armed Forces Day Flag Raising Event on 23 June 2018. 
The Lanarkshire Firm Base Group has renamed itself the Lanarkshire Armed 
Forces Community and Veterans Covenant Group and updated its Terms of 
Reference to reflect the terms of the Armed Forces Act 2021 and associated 
guidance. 
The Head of Administration and Legal Services and the Council’s Veteran
Champion, who is Co-Chair), are members of the Lanarkshire Armed Forces
Community and Veterans Covenant Group. 
112

Page 113

The organisation is the lead for delivering the key commitments contained in both
Councils’ Armed Forces Community Covenants to ensure that those who serve or
who have served in the armed forces, and their families, are treated fairly.   
8. Defence Employer Recognition Scheme 
In 2014 the Prime Minister launched the Defence Employer Recognition Scheme
(ERS), to recognise and reward UK employers for their support and commitment
towards the Defence community.  There are three tiers of award – Gold, Silver and
Bronze – for employers who pledge, demonstrate or advocate support to the Armed
Forces Community in alignment with the Armed Forces Covenant.  The Council
currently hold the Defence Employer Recognition Scheme (ERS) Silver Award.  It
was awarded this in March 2023 and this is the Council’s second year of holding this
award.   
In holding the Silver Award, SLC has demonstrated support for Defence, employing
at least one Reservist, actively communicating and upholding a positive stance to
their employees via established HR policies and procedures.  Silver Award holders
support Reservists by showing flexibility to plan for and allow them to fulfil their
annual training and mobilisation commitments.  SLC also met the requirements of
the Bronze Award, demonstrating our pledge to support Defence, and take a positive
stance towards Reservists who are either existing or prospective employees.  The
Council also seek to promote an Armed Forces friendly position and are open to
employing Reservists and supporting their training and mobilisation commitments. 
113

Page 114

The Council’s Strategy 
The Council’s Strategy and Action Plan has five workstreams to recognise and
support the Armed Forces community, as detailed below: 
• Promote the Covenant to our staff and external stakeholders.
• Provide employment support to members of the Armed Forces Community.
• To engage and work with the established Lanarkshire Armed Forces
Community and Veterans Covenant Group.
• Provide the Armed Forces Community with fair access to our services, in
particular housing, education and health and social care.
• Promote and support local Armed Forces events and military heritage sites 
The Council is a proud supporter of the Armed Forces, and we regard ourselves as
'Armed Forces Friendly’'.  The Council will demonstrate its commitment to the Armed
Forces through the Lanarkshire Armed Forces Handbook, developed through the
Lanarkshire Armed Forces Community and Veterans Covenant Group, link included. 
CC_2023_00572 Lanarkshire Armed Forces booklet.pdf
(northlanarkshire.gov.uk)
This handbook demonstrates a shared service strategic approach to supporting the
armed forces, it is reflected in the Council Strategy and Action plan and includes the
following supports and signposting: 
Leavers and Veterans
When someone leaves service life, they will face some big decisions such as where
to live and find a job and maybe moving their family away from the base and the
support network they have there. 
If someone leaving the Armed Forces is planning to move to South Lanarkshire from
elsewhere in the UK or abroad, the Council will provide information on local services
and sources of support.  This information will also be helpful even when someone
has left the service some time ago. 
Employment and Training
Transition from military to civilian life is a time of great change, the Council will
provide information on resettlement, training, workshops and employers who are
actively recruiting through its partnership approach. Skills Development Scotland will
support leavers with free impartial Careers Guidance for all leavers and their
families.   
Money
Someone leaving the Armed Forces should not be disadvantaged as a result of their
service.  Information and support can be provided to help with credit ratings,
mortgages and loans, motor and home Insurance, mobile and TV contracts. 
Housing
North and South Lanarkshire Councils operate common house registers, this means
veterans and serving personnel can use one application form to apply for social
114

Page 115

housing in each of the local authority areas which also includes partner housing
associations.  Both Councils give veterans and those leaving the service priority
when applying for housing. 
Schools and Learning
North and South Lanarkshire Councils have lots of advice available to make the
children of those leaving the armed forces move to a new school as straightforward
as possible.  A child’s electronic records should move with them to their new school
and the school should be aware that they are receiving a service child. 
Support and advice will be provided with: 
• Meeting additional support needs
• Changing schools during term time
• Curriculum for Excellence
• Enrolling your child in primary school or nursery
• Psychological Services
• School clothing grants and free school meals
• School meals
• Provision of school transport where appropriate 
Health 
NHS Lanarkshire is also signed up to the Armed Forces Covenant. In turn, this
ensures that everyone is able to be registered with a local GP and able to access
respective health care treatment.  The NHS Covenant duties ensure that no serving
member or veteran will be disadvantaged as a result of their service and, where
appropriate, priority treatment is available for veteran’s whose health condition has
been impacted directly by their armed forces service.  NHSL has its own Armed
Forces and Veterans’ Champion who will, where necessary, work with SLC
colleagues to ensure a ‘joined up’ approach to support individuals where their needs
or circumstances straddle a number of services and/or agencies. 
General Advice
Within the Lanarkshire Handbook there is information on how to obtain general
advice 
Living in South Lanarkshire
Lanarkshire is a great place to work, live and play.  The area covers urban areas
such as Rutherglen, Hamilton and East Kilbride and rural areas such as Clydesdale. 
Both North and South Lanarkshire have their own leisure and cultural trusts so there
is plenty to keep the whole family entertained. 
Parks and Outdoors
Across Lanarkshire there are six large country parks, countless playparks and the
great outdoors is never far away.  Within South Lanarkshire there are: 
• Allotments and food growing
• Local nature reserves
115

Page 116

• Parks
• Places to visit
• Skateparks
• Walking, cycling and horse riding 
Further information is available on the visit Lanarkshire website. 
Practical Information
The Council will provide information on Council Tax, Council Tax Bands and
Councillors 
Sport and Culture
The Council will provide information on Arts and Entertainment, Halls and Venues,
Health and Fitness, Libraries, Museums 
Who to contact if you are worried about a Veteran
The Council will provide information for non-emergency and emergency help to
Veterans. 
The Armed Forces Covenant Fund
The Ministry of Defence provide money through the Armed Forces Covenant Trust to
support the Armed Forces Community with grant programmes. 
116

Page 117

SOUTH LANARSHIRE COUNCIL ARMED FORCES COMMUNITY COVENANT
STRATEGY ACTION PLAN 
Workstream 1 – Promote the Covenant to our staff and external stakeholders
Action Service Lead Timescale Comment
Review of
Veterans pages on
Council’s website
Head of
Corporate
Communications
and Head of IT
September 2024 
Annual Report on
Strategy and
Covenant to Full
Council
Head of
Administration &
Legal Services
January 2025 
Creation of
Lanarkshire
Armed Forces
Covenant Guide
Head of
Administration &
Legal Services
December 2025 
Delivery of training
on Armed Forces
Covenant Duty to
relevant Council
services
Head of
Administration &
Legal Services
December 2024 
Creation of Armed
Forces Covenant
Cross Service
Working Group
Head of
Administration &
Legal Services,
Resource
Champions and
Head of
Personnel
Services
June 2024 
Workstream 2 – Provide employment support to members of the Armed
Forces Community
Action Service Lead Timescale Comment
Maintain Defence
Employer
Recognition
Scheme Silver
Award
Head of
Personnel
Services
March 2025 The Council have
held the award since
2014 and continue to
maintain the criteria,
it was renewed in
March 2024
Work towards
achieving Defence
Recognition Gold
Award
Head of
Personnel
Services
March 2025 This level of award
focuses on advocacy 
117

Page 118

Workstream 3 – Engage and work with Lanarkshire Armed Forces
Community and Veterans Covenant Group
Action Service Lead Timescale Comment
Meetings to be co-
chaired by Armed
Forces Champion
Head of
Administration &
Legal Services
September 2024 -
Quarterly 
Meetings to be
attended by Armed
Forces Champion
Head of
Administration &
Legal Services
September 2024 -
Quarterly 
Minutes of meeting
to be shared
internally with
relevant Council
officers
Head of
Administration &
Legal Services
September 2024 -
Quarterly 
Workstream 4 – Provide the Armed Forces Community with fair access to our
services, in particular housing, education, and health and social care
Action Service Lead Timescale Comment
Creation of Armed
Forces Covenant
Working Group
Head of
Administration &
Legal Services
June 2024 Veteran Champions
across Education,
Housing and Health &
Social care.
Establish tracker to
monitor housing
enquiries
Strategy and
Policy Adviser,
Housing and
Technical
Resources
March 2024
Complete
Tracker allows
individual cases to be
monitored to
resolution
Undertake review
of housing
allocation policy
Strategy and
Policy Adviser,
Housing and
Technical
Resources
2025/2026 Ensure allocation
policy takes account
of national and local
guidance on housing
veterans and leavers
Maintain accurate
SEEMIS data as
required by the
ADES annual
census
Partnership
Planning
Manager,
Education
Resources
October 2024 (and
annually)
Provides accurate
understanding of
scope and scale of
Army Families
Federation pupils in
our schools and
establishments.
(487 as at September
2023)
Engage with Army
Families
Federation and
pupils in South
Lanarkshire to
Partnership
Planning
Manager,
Education
Resources
March 2025 Supporting the
Centre for Military
Research, Education
& Public
Engagement,
118

Page 119

identify lived
experience and
better understand
needs
Edinburgh Napier
University and ADES
research additional
barriers and ASN
issues in education
Provide support
and advice
regarding
education related
issues 
Partnership
Planning
Manager,
Education
Resources
As and when
required
Ensuring that there is
a reference point for
Army Families
Federation regarding
education issues
when required
Provide support
and advice
regarding health
and social care
issues
HSCP
Champion
As and when
required
Ensuring that there is
a reference point for
Army Families
Federation regarding
health and social care
issues when required 
Workstream 5 – Promote and support local Armed Forces events and military
heritage sites
Action Service Lead Timescale Comment
Armed Forces Day
and Week 
Members’
Services Officer
June every year Preparation in
progress for 2024
Festival of
Remembrance
Members’
Services Officer
November every
year
In tandem with the
British Legion.
Preparation in
progress for 2024
Larkhall
Remembrance
Sunday
Members’
Services Officer
November every
year
Arrangements start
August every year
East Kilbride
Remembrance
Sunday
Members’
Services Officer
November every
year
Arrangements start
August every year
Hamilton
Remembrance
Sunday
Members’
Services Officer
November every
year
Arrangements start
August every year
Armistice Day
Service
Members’
Services Officer
November every
year
Arrangements start
August every year 
119

Page 120

120

Page 121

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Chief Executive  
Subject: Recommendations Referred by Community and
Enterprise Resources Committee 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the following referred to this Committee by the Community
and Enterprise Resources Committee of 18 June 2024 in respect of:- 
 South Lanarkshire Council Bereavement Services Strategy 2024 to 2033
 Introduction of Charge for Uplift of Household Garden Waste (Burgundy)
Bin
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that, in relation to the South Lanarkshire Council Bereavement Services
Strategy 2024 to 2033, as detailed in the report to the Community and
Enterprise Resources Committee of 18 June 2024:- 
(a) the Bereavement Services Strategy 2024 to 2033 be approved; 
(b) the new crematorium service time pilot be approved; and 
(c) the new and harmonised charges be approved. 
(2) that, in relation to the introduction of a charge for the uplift of household
garden waste (burgundy) bins, as detailed in the report to the Community and
Enterprise Resources Committee of 18 June 2024:- 
(a) the proposal to introduce a charge for the uplift of burgundy bins
containing garden waste be approved; 
(b) the increase of the Waste Services’ establishment by 4 Full-time
Equivalent (FTE) on a temporary basis and 9 FTE on a permanent basis
be approved; and 
(c) that the increase of the vehicle establishment for Waste Services be
approved.
11
121

Page 122

[1recs]
3. Recommendation Referred by Community and Enterprise Resources
Committee of 18 June 2024 – South Lanarkshire Council Bereavement
Services Strategy 2024 to 2033 – Extract of Minute
3.1. A report dated 29 May 2024 by the Executive Director (Community and Enterprise
Resources) was submitted seeking endorsement of the South Lanarkshire
Bereavement Services Strategy 2024 to 2033. 
The Council operated a Bereavement Service that provided a dignified and sensitive
burial and cremation service.  The key piece of legislation governing the Service was
the Burial and Cremation (Scotland) Act 2016 which was passed by the Scottish
Parliament on 22 March 2016 and received Royal Assent on 28 April 2016.  The
2016 Act fulfilled the commitment of the Scottish Government to implement the
recommendations made by:- 
 The Burial and Cremation Review Group (2007)
 The Infant Cremation Commission (2014)
 The National Cremation Investigation (2016) 
A Working Group had been formed in July 2016 to commence regulations of the Act. 
Priority had been given to implementing Part 2 of the Act on Cremation and this
resulted in the Cremation (Scotland) Regulation 2019.  The COVID-19 pandemic had
disrupted and delayed progress, however, a working group was still actively working
on the regulations for Part 1 (Burial) of the Act.  The most recent activity had been a
consultation on the regulations which was completed in November 2023.   
The South Lanarkshire Council Cemetery Strategy 2023 to 2024 was approved by
the Committee on 30 May 2023 and had allowed the Council to implement the
strategic approach to the provision of burial ground within the local authority area, as
detailed in paragraph 3.4 of the report.  The Bereavement Strategy incorporated the
previous work undertaken in the Cemetery Strategy to include the Crematorium to
deliver a long-term vision for the Council’s Bereavement Service. 
The Bereavement Strategy 2024 to 2033, attached as an appendix to the report, was
a strategic document that would assist the Council in providing, maintaining, and
managing its crematorium and cemeteries over the long term.  The Strategy included
all aspects of the management and operation of the Council’s Bereavement
Services.  The Strategy detailed:- 
 the purpose and vision
 the legal context
 the demographic context, demand and capacity
 crematorium rules and areas for development
 cemeteries rules and areas for development
 infrastructure and maintenance
 pricing structure 
The key points of the Strategy were detailed in section 4 of the report and included:- 
 crematorium services:-
 the demand for cremations had increased since the South Lanarkshire
Crematorium opened in 2006 and that trend would continue, as detailed at
paragraph 4.2 of the report
122

Page 123

 the crematorium operated with 3 different options of service times. An
analysis of usage was provided at paragraph 4.3 of the report
 a proposal to offer a new type of morning service at 8.00am and 8.15am to
utilise unused capacity was detailed at paragraph 4.4 of the report. An
increase of uptake of early services was anticipated and this would be
monitored for 6 months
 the crematorium infrastructure:-
 the cremators were now over 17 years old and required regular repair as
well as annual servicing.  Recurring costs over the last 3 years were
detailed in paragraph 4.5 of the report.  The Service operated a financial
sink fund whereby any additional income generated was set aside to re-
invest in the ongoing maintenance requirements
 the cremators would become less efficient over time and would likely need
to be fully replaced over the next 5 years. Future replacement would
provide the opportunity to consider larger capacity to meet the increasing
requirement for outsized coffins 
 IT modernisation:-
 the current IT system had been in place since 2005, however, the Service
aimed to invest in a new, cloud-based system to drive modernisation, as
set out in paragraph 4.7 of the report
 the charging framework:-
 operating costs for the Service were continuing to increase, particularly for
the crematorium
 a review of existing charges had been conducted and benchmarked
against comparators.  4 activities had been identified, as detailed in
paragraph 4.9 of the report, where the Council did not currently charge but
proposed to introduce a charge
 the review had also allowed the opportunity to harmonise charging across
the crematorium and cemeteries and those proposals were detailed in the
table at paragraph 4.10 of the report
 stakeholder engagement:-
 the first broad consultation on the Service would be undertaken and would
include members of the public, funeral directors, clergy, humanists, other
celebrants, and any other interested parties 
The Bereavement Strategy for South Lanarkshire 2024 to 2033, including a
crematorium service time pilot and introduction of new and harmonised charges, if
endorsed, would be referred to the next meeting of the Executive Committee for
approval. 
The Committee decided: 
(1) that the Bereavement Services Strategy for South Lanarkshire 2024 to 2033, as
detailed at Appendix 1, be endorsed; 
(2) that the new crematorium service time pilot, as detailed in section 4.4 of the
report, be endorsed; and 
(3) that the new and harmonised charges, as detailed in sections 4.9 and 4.10 of
the report, be endorsed.
123

Page 124

The Committee
recommended to the
Executive Committee:
that the Bereavement Strategy for South
Lanarkshire 2024 to 2033, including a
crematorium service time pilot and introduction of
new and harmonised charges, be approved. 
[Reference: Minutes of 30 May 2023 (Paragraph 10)] 
3.2 A link to the report submitted to the Community and Enterprise Resources
Committee of 18 June 2024 is provided for information.
South Lanarkshire Council Bereavement Services Strategy 2024 to 2033 
4. Recommendation Referred by Community and Resources Committee of 18
June 2024 – Introduction of Charge for Uplift of Household Garden Waste
(Burgundy) Bin – Extract of Minute 
4.1. A joint report dated 28 May 2024 by the Executive Directors (Community and
Enterprise Resources) and (Finance and Corporate Resources) was submitted
seeking endorsement for a proposal to introduce a charge for the uplift of burgundy
bins containing garden waste. 
In 2015, the Council introduced a burgundy bin to collect food waste to comply with
the Waste (Scotland) Regulations 2012.  Those Regulations placed a statutory
obligation on local authorities in Scotland to provide householders with a separate
food waste collection service.  Although there was no statutory requirement to
provide residents with a garden waste collection service, the Council allowed
residents who had been provided with a burgundy bin to deposit unbagged,
compostable garden waste free of charge. 
Approximately 110,000 households had been provided with a burgundy bin to
present commingled food and garden waste.  Residents in flatted properties with no
gardens had communal ‘food only’ burgundy bins.  Around 5,000 rural properties,
mainly in Clydesdale, were not provided with a burgundy bin and were currently
unable to present food or garden waste separately at the kerbside.  All South
Lanarkshire Council residents, including those in rural areas, could request a garden
waste uplift for unbagged compostable wate.  The cost of that service was £40 for up
to 10 items. 
As councils across the country looked for ways to reduce budgetary pressures,
charges for garden waste collections had become increasingly common.  Currently
in Scotland:- 
 6 councils did not provide a kerbside garden waste collection service for
residents  
 21 councils operated a chargeable garden waste permit scheme
 5 councils currently provided a free of charge garden waste collection service   
The councils that operated a permit system charged residents an average of £42.16
per year.  Further information of the cost of garden waste permits in Scotland was
provided at Appendix 1 to the report. 
A proposal, which would make use of garden waste permits in South Lanarkshire to
recover some of the costs associated with providing the Service, was fully detailed at
section 4 of the report.  Key aspects of that proposal included:-
124

Page 125

 residents who used the burgundy bin solely for food waste would not require a
permit
 the permit would cost £45 per annum and, except for a 2-week period over
Christmas and New Year, the burgundy bin would be collected every 2 weeks in
the financial year
 unlike the current food and garden waste collection service, the permit scheme
would be available to residents in rural Clydesdale.  The cost of the permit
would include the cost of providing the burgundy bin as well as a food waste
caddy.  The establishment of this service would allow those residents in rural
Clydesdale not currently on the service to opt in to receive a burgundy bin and
caddy for food waste only
 the new Service would commence from 1 April 2025, however, given the scale
of the project, it was anticipated that implementation work would commence on
1 July 2024
 significant community engagement would be undertaken by Waste Services to
ensure residents were aware of the new charges as well as alternative options. 
A ‘Frequently Asked Questions’ document was provided at Appendix 2 to the
report 
 the costs associated with the proposal, outlined at paragraphs 4.6 to 4.13 of the
report, included:-
 the establishment of a Project Team to manage the design,
implementation and roll out of the Service.  This would include a specialist
IT system to manage the permit process.  Costs associated with
establishing the Project Team, purchasing the IT system and burgundy
bins were estimated at £0.170 million
 the vehicle fleet establishment would need to be increased by 3 refuse
collection vehicles in 2025/2026. Leasing and maintenance costs were
detailed at paragraph 4.8 of the report.  Employee costs associated with
the additional Waste Operatives required to crew those vehicles would be
in the region £0.184 million in 2025/2026 and £0.330 million from
2026/2027 onwards
 four 14-tonne refuse collection vehicles, that had been purchased using
funding from Zero Waste Scotland in 2015, would have to be replaced to
ensure the Service continued to operate across South Lanarkshire.  Those
‘owned’ assets were not on the vehicle replacement list and were now
nearing end of life.  The cost of replacing those with leased vehicles was
detailed at paragraph 4.10 of the report
 expected income from the uptake of the Service, as outlined at paragraph 4.12
of the report 
The proposal to introduce a charge for the uplift of burgundy bins containing garden
waste would require an overall increase in establishment, with the following posts
being added to Waste Services, as detailed at paragraphs 5.2 and 5.3 of the report:- 
 1 FTE Project Officer post, temporary for 21 months, on Grade 3, Level 2 to 4,
SCP 63-74 (£37,866 to £43,615)
 3 FTE Waste Education Assistant posts, temporary for 12 months, on Grade 2,
Level 1, SCP 34-35 (£26,023 to £26,406)
 4 FTE permanent Waste Operative (Loaders) posts on Grade 1, Level 3, SCP
25-27 (£25,140 to £25,729)
 5 FTE permanent Waste Operative (Drivers) posts on Grade 1, Level 4, SCP
30-31 (£29,682 to £30,054)
125

Page 126

The permanent posts would be implemented on a phased basis over 2 years, as
detailed at paragraph 5.4 of the report. 
The total costs associated with the proposal were detailed at section 6 of the report
and included estimated net income after deducting the costs of the Service.  The
proposal, if endorsed, would be referred to the next meeting of the Executive
Committee for approval.   
The Scottish Government was currently considering proposals to make garden
waste collections mandatory.  If that was to be implemented, the Council would no
longer be able to charge for the collection service.  It was expected that appropriate
compensatory funding would be made available to local authorities in respect of the
new statutory obligation. 
Following an extensive discussion and interchange of views, Councillor Brown,
seconded by Councillor Devlin moved that the matter be referred, without
endorsement, to the Executive Committee for decision. 
Councillor McAllan, seconded by Councillor Johnston-Dempsey moved as an
amendment that the recommendations in the report be not endorsed and not
referred to the Executive Committee. 
On a vote being taken using the electronic voting system, 12 members voted for the
motion and 11 members voted for the amendment.  The motion was declared
carried. 
The Committee decided: that the matter be referred, without endorsement,
to the Executive Committee for decision. 
4.2 A link to the report submitted to the Community and Enterprise Resources
Committee of 18 June 2024 is provided for information.
Introduction of Charge for Uplift of Household Garden Waste (Burgundy) Bin 
5. Employee Implications
5.1. All employee implications were highlighted as part of the original reports to the
Resource Committee. 
6. Financial Implications
6.1. All financial implications were highlighted as part of the original reports to Resource
Committee. 
7. Climate Change, Sustainability and Environmental Implications
7.1. All climate change, sustainability and environmental implications were highlighted as
part of the original reports to Resource Committee. 
8. Other Implications
8.1. Any risks or other implications were highlighted as part of the original reports to the
Resource Committee. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Equality impact assessment and consultation arrangements were highlighted as part
of the original reports to the Resource Committee.
126

Page 127

Paul Manning
Chief Executive 
18 June 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
♦ Community and Enterprise Resources Committee of 18 June 2024 (Paragraphs 8 and
9) 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel: 07385 370089
E-mail:  tracy.slater@southlanarkshire.gov.uk
127

Page 128

128

Page 129

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: South Lanarkshire Local Heat and Energy Efficiency
Strategy (LHEES) 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Executive Committee on findings from the consultation and
engagement regarding the draft Local Heat and Energy Efficiency Strategy
(LHEES) 
 seek approval for the finalised LHEES (attached as Appendix 1)
 outline the proposed monitoring, reporting and governance arrangements for the
LHEES
[purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s): - 
(1) that the findings from consultation and engagement with stakeholders
regarding the LHEES be noted;
(2) that the finalised LHEES and Delivery Plan be approved; and
(3) that the proposed governance, monitoring and reporting arrangements be
approved.
[purpose]
3. Background
3.1. The concept of a Local Heat and Energy Efficiency Strategy (LHEES) was introduced
following Scottish Government consultation in 2017. The underlying principle was to
establish a long-term plan for decarbonizing heat in buildings and improve their
efficiency across an entire local authority area. This was followed by the Heat in
Buildings Strategy published in October 2021 which confirmed that the introduction of
area based LHEES are fundamental to the Scottish Government’s approach to heat
decarbonisation. 
3.2. The creation of a LHEES brings together key priorities around the reduction of carbon
emissions, improvement of domestic and non-domestic building stock and the need
for a reduction in fuel poverty. The development of a LHEES requires consideration of
these priorities in a comprehensive way to ensure that action addresses inequalities
and supports a just transition to net-zero carbon by 2045. 
3.3. The Scottish Parliament passed the Local Heat and Energy Efficiency Strategies
(Scotland) Order in May 2022. The LHEES Order places a duty on local authorities to
prepare, publish and update a Local Heat and Energy Efficiency Strategy and Delivery
Plan.  
12
129

Page 130

3.4. All local authorities were required to publish their first Local Heat and Energy Efficiency
Strategy and Local Heat and Energy Efficiency Delivery Plan on or before 31
December 2023. The Scottish Government also indicated that all local authorities must
keep their LHEES and Delivery Plan under review. 
3.5  The LHEES is required to prioritise areas for delivery of heat decarbonisation actions.
It must cover all building sectors – domestic, non-domestic and public buildings and
set a strategic framework for decarbonising the heat in these buildings. It will: 
• set out how each segment of the building stock needs to change to reach net
zero
• identify strategic heat decarbonisation zones and sets out the principal
measures for reducing buildings emissions within each zone 
3.6. Locally, the South Lanarkshire LHEES has been written in such a way to ensure that
it complements and supports the Sustainable Development and Climate Change
Strategy 2022 to 2027. 
3.7. The need to ensure that the necessary datasets were effectively developed, reviewed,
and analysed, coupled with a commitment to ensure that adequate time was provided
for consultation has meant that the December timescale was not achieved. The 
Scottish Government have been kept up to date on progress and the anticipated date
of publication. 
3.8 Work on the consultative draft was completed in late January 2024 and the draft
Strategy and Delivery Plan were issued for consultation on 14 February 2024. 
4. Consultation and engagement
4.1. The public and stakeholder consultation for the draft LHEES and Delivery Plan
covered an eight-week period, closing on 12 April 2024. An online survey was
conducted on the Council’s Sustainable South Lanarkshire website during the
consultation period. The survey was widely publicised internally through the Intranet
and externally via the South Lanarkshire View. 
4.2. As part of the consultation process, the Council has also engaged directly with a wide
range of partners and stakeholders who provided constructive and positive feedback. 
This included:- 
 Lanarkshire Business Hub
 Lanarkshire Climate Action Hub
 Local groups with an interest in climate change, climate action and sustainability
 South Lanarkshire Private Landlord Forum
 Tenant representatives of the South Lanarkshire Tenant Participation
Coordination Group
 Financial Inclusion Network Fuel Poverty Sub-Group
 Registered Social Landlord Forum
 Local Housing Strategy Steering Group 
4.3. A special elected members awareness session was held on 10 May 2024, providing
elected members with the opportunity to review the draft in detail and speak with
officers from across the Resources involved prior to submission for Committee
approval. 
130

Page 131

4.4.  Feedback on the draft LHEES was positive. Over 80% of the respondents agreed with
the three key priorities outlined in the LHEES, see 5.3 below. 
4.5. A copy of the draft LHEES was also submitted to the Scottish Government for review.  
Feedback from this noted that the Council has initiated a comprehensive LHEES,
highlighting a commitment to decarbonisation and energy efficiency, which aligns with
Scotland's statutory targets. The Delivery Plan indicates a focus on a fabric-first
approach, transitioning to zero direct emissions heating systems, and developing heat
networks. 
4.6. The review further noted that:- 
 the Delivery Plan is at an early stage, which reflects development to date and
projects already underway rather than a finalised set of actions
 further work will be required to develop the Delivery Plan in year one 
5. Proposed LHEES priorities and structure 
5.1. It is proposed that the LHEES Strategy and Delivery Plan are published as separate
documents on the Council’s website following formal adoption by the Executive
Committee. 
5.2. The LHEES Strategy will consider both national and local priorities, policies, and
strategies.  The Strategy will take account of changes to the national and local context
and make appropriate linkages to local and planned infrastructure upgrades, other
major projects, access to available resources and funding, decisions over the gas grid
and community engagement. 
5.3. The priorities for LHEES are as follows:- 
 Priority 1: Reduce heat demand using a fabric first approach to improve the
condition and energy efficiency of housing across all tenures to ensure that poor
energy performance is removed as a driver of fuel poverty.
 Priority 2: Transition to zero direct emissions heating systems in buildings across
South Lanarkshire to tackle climate change.
 Priority 3: Make greater use of heat networks as part of the wider just transition to
net zero. 
5.4. The LHEES Delivery Plan is an action plan enabling the Council and our partners to
work towards the delivery of the changes identified in the LHEES. The Delivery Plan
will identify stakeholder roles and their responsibilities, build on existing plans and
policies and coordinate action across local partners. 
6. Monitoring, reporting and governance arrangements
6.1. As required in Scottish Government guidance, the LHEES requires be reviewed on an
annual basis. Due to alignment with the Councils’ Sustainable Development and
Climate Change Strategy 2022 to 2027, it is proposed an annual report is presented
to the Climate Change and Sustainability Committee outlining progress achieved and
key changes required. 
6.2. The approach to reporting on the LHEES will ensure coherence and consistency in
relation to the progress being achieved between the actions which are shared with the
Sustainable Development and Climate Change Strategy 2022 to 2027.  
131

Page 132

7. Employee Implications
7.1. All Resources will be required to contribute to the implementation of the Local Heat
and Energy Efficiency Strategy to ensure that actions and targets are met. 
7.2. As outlined in section 8.2 below, the Scottish Government have allocated each local
authority £75,000 annually until 2027/2028 to support the development and delivery
of the first iteration of LHEES.   
7.3. To help co-ordinate delivery and reporting arrangements for the Strategy, existing
resources within Housing and Technical Resources are being realigned, with a
dedicated officer established to act as the main point of contact for the Council and
partners in relation to LHEES. 
8. Financial Implications
8.1. The LHEES itself does not commit any expenditure. There will be additional costs
associated with the delivery of projects identified through the LHEES, some of which
will be eligible for external funding. Funding options will be developed and reported on
a project-by-project basis. 
8.2. Each local authority will receive £75,000 annually to support the development of its
LHEES. This funding will be paid by the Scottish Government at the end of March
each year as a redetermination of the General Revenue Grant, until 2027/2028. 
9. Climate Change, Sustainability and Environmental Implications
9.1. It is anticipated that there should be no new significant environmental implications that
have not already been identified in either the national Heat in Buildings Strategy or
Council-led plans, for example, the Local Housing Strategy, Council Plan, Community
Plan, Local Development Plan 2, Sustainable Development and Climate Change
Strategy. Any new effects should be minor and positive in nature. Where identified,
appropriate enhancement or mitigation measures will be considered within the
LHEES. 
9.2. In formally determining whether a Strategic Environmental Assessment (SEA) is
required, the Council has considered the views of the Consultation Authorities who
agree that the LHEES is unlikely to have significant environmental effects and
therefore a SEA will not be undertaken. 
10. Other Implications
10.1. Failure to meet sustainable development and climate change objectives is one of the
top risks for the Council. Without a plan in place and a financial plan to support it then
this risk will continue to be one of the Council's top risks. 
11. Equality Impact Assessment
11.1. An Equality Impact Assessment (EqIA) was undertaken as part of the development of
the draft strategy.  This identified that there would be no negative impact on the
following categories: age, disability, gender, marriage and civil partnership, pregnancy
and maternity, race, religion and belief, sex, and sexual orientation, whilst also
highlighted that a key consideration of LHEES is to ensure a just transition in relation
to tackling climate change, contributing to a quality of life which is fair, inclusive, and
does not disadvantage anyone. 
132

Page 133

11.2. A Fairer Scotland Duty Assessment was also undertaken as part of the development,
concluding that South Lanarkshire’s LHEES will effectively support the delivery of the
council’s wider goals of supporting those who are most vulnerable, reducing poverty,
and decreasing carbon emissions. The assessment identified that those who are most
vulnerable or faced socio-economic challenges would be the most adversely impacted
by climate change, with the LHEES acting as an engagement vehicle to ensure
effective actions to tackle climate change are taken forward. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
5 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Fair, open and sustainable
 Accountable, effective, efficient, and transparent
 We will work towards a sustainable future in sustainable places
 Good quality, suitable and sustainable places to live 
 Caring, connected, sustainable communities 
Previous References
 Update on Local Heat and Energy Efficiency Strategy, Climate Change and
Sustainability Committee, 28 February 2024 
List of Background Papers
 The Climate Change (Scotland) Act 2009
 South Lanarkshire Sustainable Development and Climate Change Strategy 2022-27
 South Lanarkshire Strategic Housing Investment Plan 2023-28
 South Lanarkshire Council Local Housing Strategy 2022-27 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Name: John Smith
Designation: Investment Officer, Housing and Technical Resources
E-mail: john.smith@southlanarkshire.gov.uk 
133

Page 134

134

Page 135

1 
South Lanarkshire Council
Local Heat and Energy
Efficiency Strategy
June 2024 
12
135

Page 136

2 
Executive Summary 
South Lanarkshire’s Local Heat and Energy Efficiency Strategy (LHEES) sets out how to tackle
greenhouse gas emissions from buildings, whilst also improving residents’ quality of life by
addressing fuel poverty. South Lanarkshire, and Scotland as a whole, will be net zero by 2045.
This is a challenging target, and the LHEES is a key step in planning our approach to achieving
this goal. 
The LHEES Strategy is a long-term strategic framework for decarbonising heat in buildings and
improving energy efficiency across South Lanarkshire. It is published alongside the LHEES
Delivery Plan, which sets out how South Lanarkshire Council will implement the strategy over the
next five years. 
South Lanarkshire’s LHEES will support the delivery of the Council’s goals of improving energy
efficiency, reducing fuel poverty, and decreasing carbon emissions through zero direct emissions
heating systems. The Council will use the LHEES to inform the development of Capital and
Revenue programmes and as a means of engagement with stakeholders and community groups. 
The Council has identified three priorities for the LHEES: 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition
and energy efficiency of housing across all tenures to ensure that poor energy performance
is removed as a driver of fuel poverty. 
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change. 
Priority 3: Make greater use of heat networks as part of the wider just transition to net
zero. 
The LHEES has been developed in accordance with the Scottish Government’s methodology. This
consists of 8 stages which bring together:
• the Council’s existing goals and strategies
• data analysis of the building stock
• input from different stakeholder groups
Overall, the content of South Lanarkshire’s LHEES has been informed primarily through a data-
driven approach using a number of datasets and proxy indicators. 
South Lanarkshire Council is already making progress toward achieving its goals of
decarbonisation, improving energy efficiency, and reducing fuel poverty. Within its own stock, the
Council is investing in improving energy efficiency to meet required standards. Beyond the
Council’s buildings, improvements have been carried out to homes under the Area Based
Schemes and Energy Company Obligation programmes. The LHEES will support the Council and
its community planning partners to scale up and align existing programmes, and to increase the
scale and pace of retrofit and heat network development that is needed to meet the national target
of net zero by 2045.  
136

Page 137

3 
The Sustainable Development and Climate Change Strategy covers the actions the council will
take to tackle climate change. The Council’s Corporate Plan: Connect, highlights the work required
to develop local solutions to protect nature and to take action on climate change. The Local
Housing Strategy outlines actions to make housing in South Lanarkshire more sustainable and
improve energy efficiency while ensuring that more of the energy used comes from low carbon and
renewable sources.
South Lanarkshire’s Building Stock
A baselining exercise has been carried out to highlight key characteristics within the housing stock
across South Lanarkshire. This will allow benchmarking in future iterations of LHEES and enable
the evaluation of progress towards targets and the ultimate target of net zero by 2045. It also
highlights some of the opportunities for how and where the Council can target interventions to
achieve the greatest impact. 
Domestic properties
The majority of domestic properties are cavity construction type (~70%), with the remaining 30%
equally distributed between solid brick or stone, system built, and timber frame. This means that
there are opportunities for standardising fabric measures to enable installations at scale in cavity
construction properties.
South Lanarkshire has one of the lowest rates of fuel poverty in Scotland, according to data from
the 2019 Scottish House Condition Survey. However, over 20% of South Lanarkshire’s residents
are in fuel poverty. Addressing fuel poverty remains a priority for the Council and is specifically
addressed in the LHEES and Delivery Plan.  
South Lanarkshire Council owns 15% of the properties within the local authority area. This
provides the Council with opportunities to upgrade properties at scale. This is particularly important
in the social housing sector, as half of all social housing properties within the local authority area
are in SIMD deciles 1 (most deprived) and 2. This means that they have a high risk of fuel poverty.  
The majority (89%) of domestic properties have a fossil fuel-based heating system. This means
that there is significant work to be done to decarbonise heating in South Lanarkshire’s homes
through heat networks and switching to zero direct emissions heating systems such as heat
pumps.
South Lanarkshire Council is already investigating the potential for new heat network
developments in two areas. Feasibility studies have been conducted by external consultants for
heat networks in Hamilton, around Almada Street and for decarbonising the six tower blocks in
Calderwood, East Kilbride. 
Non-domestic properties
The heat demand of non-domestic buildings in South Lanarkshire is 513,110 MWh/yr, equivalent to
76% of the total heat demand and significantly more than the heat required for domestic properties. 
Buildings such as hotels, leisure facilities, industry, education, and community centres have larger
average heating demands per property than buildings such as offices and retail premises. 
137

Page 138

4 
Mains gas is used to meet 57% of the total heat demand for non-domestic properties in South
Lanarkshire, providing 291,454MWh/yr of heat (Table 18 Heat demand by main fuel type
(MWh/yr)Table 18). This means that properties which use gas as a main fuel type have a higher
average demand than those that use electricity.
Heat Network opportunities in South Lanarkshire
Heat networks have been identified as a low-regrets1 decarbonisation option in the Scottish
Government’s Heat in Buildings Strategy. 90% of South Lanarkshire’s residents live in urban areas
which may be suitable for the development of heat networks. The Council has carried out data-
driven analysis to highlight potential areas for future heat network development, including new
build developments. This has highlighted 11 potential heat network zones for further investigation
with actions for each discussed within the Delivery Plan.
Challenges to delivery 
This Strategy outlines a number of challenges which need to be overcome in order to decarbonise
South Lanarkshire’s buildings. These include:
• Market disincentives, such as the current unit price differential between gas and electricity
• Consumer uncertainty about new technologies
• Challenging property types, such as those that require significant fabric upgrades
• An underdeveloped supply chain for energy efficiency and heating upgrades 
Not all of these challenges can be addressed in the first iteration of LHEES, or the first Delivery
Plan. For this reason, the LHEES will be an iterative Strategy. The regulatory landscape will
change quickly over the next few years in order to drive progress in building decarbonisation in
Scotland2. The LHEES Strategy and Delivery Plan will both be reviewed annually, and if necessary
revised to react to legislative and market changes and to benefit from new opportunities that arise.   
1 Low-regrets decisions are actions that are cost-effective now and provide options and flexibility in the future
rather than blocking off options.
2 For example, the Scottish Government’s proposed Heat in Buildings Bill and the Social Housing Net Zero
Standard, or the UK Government’s Review of Electricity Market Arrangements. 
138

Page 139

5 
TABLE OF CONTENTS
SOUTH LANARKSHIRE COUNCIL 1
LHEES STRATEGY 1
JUNE 2024 1
1. Introduction 7
1.1. National Context 7
1.2. Local Context and Priorities 7
2. About LHEES 8
2.1. Purpose 8
2.2. Structure and approach 9
2.3. How this LHEES has been developed 10
3. Achieving net zero 14
3.1. Policy drivers 15
3.2. Progress to net zero in South Lanarkshire 19
4. Current Building Stock 21
4.1. Domestic buildings 22
4.2. Non-domestic buildings 37
4.3. Heat pump suitability 40
4.4. Heat network development 42
5. South Lanarkshire’s LHEES Priorities 43
5.1. Priority 1: Reduce heat demand using a fabric first approach to improve the condition
and energy efficiency of housing across all tenures to ensure that poor energy performance
is removed as a driver of fuel poverty. 43
5.1.1. Fuel Poverty 44
5.1.2. Mixed-tenure properties 46
5.2. Priority 2: Transition to zero direct emissions heating systems in buildings across
South Lanarkshire to tackle climate change. 48
5.2.1. Off-gas areas 48
5.2.2. On-gas grid buildings 48
5.3. Priority 3: Make greater use of heat networks as part of the wider just transition to net
zero. 49
Heat Network Opportunities 49
6. Opportunities for South Lanarkshire 52
6.1. Economic opportunities 52
6.2. New business models to accelerate retrofit 53
7. Challenges 54
139

Page 140

6 
7.1. Heat networks 54
7.2. Barriers to retrofit 55
7.3. Challenges associated with different tenure types 57
7.4. Rural and urban challenges 60
8. Summary 61
9. Glossary 62
9.1. Abbreviations 62
9.2. Terms 63
10. Appendices 69
10.1. Appendix A: Additional national policy drivers 69
10.2. Appendix B: Datasets used in the development of this LHEES 71
10.3. Appendix C: Datasets and Limitations of the LHEES approach 72
10.4. Appendix D: LHEES stage descriptions 75
10.5   Appendix E: Identification of conservation areas and listed buildings 77
10.6   Appendix F: Detailed methodology for the identification of potential heat network
zones 78  
140

Page 141

7 
1.  Introduction
1.1. National Context
In 2018 the Intergovernmental Panel on Climate Change (IPCC) advised that to reach the 1.5°C
target set in the Paris Climate Accord the world needs to reach net zero carbon emissions by 2050.
The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 then set an ambitious
target of Scotland reaching net zero by 2045. Achieving net zero is crucial to mitigating the impacts
of climate change to stabilise global temperatures. This is a vital step to avoid the worst
consequences of climate change. The way we heat our homes, workplaces and other buildings is
the third-largest cause of carbon emissions in Scotland. To meet the net zero target, both domestic
and non-domestic buildings in Scotland will have to significantly reduce their carbon emissions. 
Decarbonising buildings involves reducing carbon emissions associated with their energy use and
is a key factor in reaching net zero. Building decarbonisation can be achieved through measures
including improving the energy efficiency of buildings and transitioning to zero direct emissions
heating systems. This LHEES will outline how South Lanarkshire Council will identify and target
support to retrofit existing buildings with better insulation and energy efficient technologies.
Addressing fuel poverty is an important aim of this strategy. Poor energy efficiency of buildings is a
critical driver of fuel poverty. South Lanarkshire Council will utilise this strategy as the primary tool
to boost the adoption of energy efficient measures, aiming to simultaneously alleviate fuel poverty
and contribute to the path towards achieving net-zero carbon emissions.
1.2. Local Context and Priorities
South Lanarkshire has a population of 320,820, which makes it Scotland’s fifth largest local
authority by population. The local authority covers an area of 1,772 km2, almost 80% of which is
currently being used for agriculture. However, 3 out of 4 people in South Lanarkshire live in urban
areas. The largest settlements are East Kilbride, Hamilton, Rutherglen, and Cambuslang. The
larger settlements towards the south of the local authority include Carluke, Lanark, Strathaven,
Biggar and Forth. 
South Lanarkshire is growing. Since 2001 the number of households in South Lanarkshire has
been steadily increasing and has now reached 148,483. In addition, there are approximately 9,900
non-domestic properties across South Lanarkshire including schools, libraries, leisure facilities,
factories, and shops.
The Council has three key priorities that have been laid out in the Council’s Corporate Plan 2022-
2027. 
• People – Putting people first and reducing inequality is key to improving lives and life
prospects. South Lanarkshire is committed to working with communities to ensure that
voices are heard, and people have support to act on the things that are important to them.
141

Page 142

8 
• Planet – Working towards a sustainable future in sustainable places is key to protecting
our natural world for a healthier future. South Lanarkshire is dedicated to working together
to develop local solutions to protect nature, take action on climate change, and support our
young people to lead the way.
• Progress – By working together South Lanarkshire will build on what we have learned to
recover from the pandemic, while making progress through continuous improvement. This
progress will be delivered in a way that matters to everyone, is in the right place, and is at
the right time.
Aiming to contribute to all three of these wider priorities through LHEES, the council has
established the following priorities for this Strategy: 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition and energy
efficiency of housing across all tenures to ensure that poor energy performance is removed as a
driver of fuel poverty.
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change.
Priority 3: Make greater use of heat networks as part of the wider just transition to net zero.
These priorities are described in further detail in section 5 in this Strategy. They also contribute to
the structure of the LHEES Delivery Plan. Priorities 1 and 2 have shaped the identification of
delivery areas for both social housing and private tenure housing, while heat network delivery
areas have been identified in line with Priority 3.
2. About LHEES
2.1. Purpose
Scottish local authorities have a statutory duty to develop a Local Heat and Energy Efficiency
Strategy (LHEES) by 31st December 2023. This duty is described in the Local Heat and Energy
Efficiency Strategies (Scotland) Order 2022.3
LHEES are the principal mechanism for locally led heat planning across Scotland’s local
authorities. The strategies set out the long-term plan for decarbonising heat in buildings and
improving energy efficiency across an entire local authority. The focus on locally led planning is to
ensure that the decarbonisation of heat in buildings is delivered in a way that is relevant to local
contexts and tailored to the specific needs of communities.
The purpose of this LHEES is to present the evidence base that identifies what needs to be done
across South Lanarkshire to change buildings and local infrastructure by 2045 to fulfil the Scottish
Government’s objectives and local priorities relating to heat in buildings. The interventions occur at
the building level, in heat networks or in a combination of both. 
3 The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 
142

Page 143

9 
South Lanarkshire’s LHEES will support the delivery of the Council’s goals of improving energy
efficiency, reducing fuel poverty, and decreasing carbon emissions through zero direct emissions
heating system. The Council will use the LHEES to inform the development of its Capital and
Revenue programmes for Council-owned buildings, and in engagement with stakeholders and
community groups to offer targeted support for privately owned properties. 
2.2. Structure and approach
Structure
LHEES has a two-part structure, consisting of a strategy and a delivery plan.
• The LHEES Strategy is a long-term strategic framework for decarbonising heat in buildings
and improving energy efficiency across South Lanarkshire, framed around the six
considerations outlined below.
• The LHEES Delivery Plan sets out how South Lanarkshire Council will implement its
strategy over the next five years. It enables the Council to work towards delivery of the
changes identified in the strategy and clarifies the role and responsibilities of stakeholders.
This document contains South Lanarkshire Council’s LHEES Strategy. The accompanying Delivery
Plan can be found on South Lanarkshire Councils website.
Considerations
The national LHEES guidance frames the strategy around six considerations relating to heat
decarbonisation and energy efficiency. They are used to identify and target interventions in
different parts of the building stock. The six considerations are outlined in Table 1.
The considerations for heat decarbonisation grouped around buildings that are: on or off the gas
and areas with potential to develop heat networks. Considerations relating to energy efficiency and
other outcomes focus on areas with poor building energy efficiency, such as no or low levels of
insulation, and areas where this is likely to contribute to high levels fuel poverty. This focus will
ensure that energy efficiency projects will reduce fuel poverty. Mixed-tenure, mixed-use, and
historic buildings are included as a separate consideration as these are likely to require different
approaches.
Table 1: Summary of the LHEES considerations 
No.  LHEES Considerations  Description 
Heat
decarbonisation 
1  Off-gas grid buildings  Transitioning from heating oil and LPG in
off-gas areas 
2  On-gas grid  On-gas grid heat decarbonisation 
3  Heat networks  Decarbonisation with heat networks 
143

Page 144

10 
Energy efficiency
and other
outcomes 
4 Poor building energy efficiency  Poor building energy efficiency 
5  Poor building energy efficiency
as a driver for fuel poverty 
Poor building energy efficiency as a driver
for fuel poverty 
6  Mixed-tenure, mixed-use and
historic buildings 
Mixed-tenure and mixed-use buildings,
listed buildings and buildings in
conservation areas 
2.2.1 LHEES stages
This LHEES has been developed over eight stages, as outlined in Figure 1. The completion of
stages 1-6 provided the data analysis and evidence base which forms the foundation for South
Lanarkshire’s LHEES Strategy (stage 7) and Delivery Plan (stage 8). 
Figure 1: Summary of LHEES Stages 
2.3. How this LHEES has been developed 
South Lanarkshire’s LHEES was developed in partnership with Changeworks, following the
standard methodology published by Scottish Government [see section 10.4]. The table below
displays the outputs of each stage and how they have been used in the LHEES process. 
144

Page 145

11 
Table 2: Summary of LHEES outputs and its use in the project.
LHEES
Stage
Outputs and Formats Role in informing LHEES
1 Policy and Strategy Review
(.pdf/.doc)
Sets priorities for LHEES and highlights
relevant national and local policy and strategy
drivers
2 Data and Tools Library (.xlsx) Dataset scoping and review exercise, including
uses in subsequent LHEES stages and key
contacts
3 Baseline Tools (Domestic and Non-
Domestic) (.xlsx)
Maps (.pdf)
Data outputs on Strategic Zones used in the
identification and mapping of initial Delivery
Areas (Stage 4)
4 GIS layers on Heat Networks
(.mpkg)
Summary table of clusters,
resources and constraints (.xlsx)
Summary table used for sense-checking of
initial Delivery Areas and GIS layers and also
for deeper exploration of maps. Both outputs
are further carried forward for deliberation in
stakeholder workshops (Stage 6) 
5 PEAT-OR Power-BI Visual breakdown of potential costs and
savings per total installation measures at
property/ datazone levels. Demonstrated in
stakeholder workshops to identify potential
Delivery Areas
6 Ranked list of Delivery Areas Used in the structuring and writing of the
Strategy Document and Delivery Plan
7 Strategy Document (.pdf/.doc)
Storymap of Strategy Document
Summary document of local authority’s
building stock and opportunities for achieving
net zero as well as challenges
Storymap used to supplement the Strategy
document
8 Delivery Plan (.pdf/.doc) Final output highlighting priorities and actions
in delivering LHEES for the next five years 
The analysis in Stage 3 separates buildings into four categories, which are primarily based on their
suitability for a heat pump retrofit. The categories are defined in the Scottish Government’s LHEES
guidance and are based on indicators from the Home Analytics dataset. Table 3 provides a brief
description of each category and the process for categorising all domestic properties. 
145

Page 146

12 
Table 3: A description of each category of domestic properties including their specific indicators.
Building
category 
Description Indicators 
Category
0 
Currently have a low
or zero direct
emissions heating
system, or heat
network connection
• Properties with a heat pump (off-gas only) or
communal heating as the main heating system 
Category
1 
“Heat pump ready”
buildings that are
well-suited to heat
retrofit with minimal
other changes.  
• Cannot be a category 0 property
• Not listed or in a conservation area
• Properties with insulated walls and double or triple
glazed windows
• If the property has a loft, it must have at least
100mm of loft insulation
• Properties which are likely to have a wet heating
system (i.e. mains gas, LPG, Oil or Biomass/solid
fuels) 
Category
2 
Secondary potential
for heat pump
retrofit. Require
some fabric and/or
distribution systems
upgrades. 
• Cannot be a category 0 or 1 property
• Properties that are cavity construction4 (either
insulated or uninsulated), or any other construction
type, with insulated walls
• There must be no risk of the property having a
narrow uninsulated cavity
• Properties can be listed or in a conservation area 
Category
3 
Significant upgrades
required to be heat
pump ready.
Off-Gas Categorisation Process
The subcategory indicates the most viable decarbonisation
technology.  Heat pumps are the priority solution. The
suitability of storage or direct electric heating, and biomass
are indicated by the characteristics listed below:
Category 3 – Heat pump
• If the property is currently heated via an oil or LPG
system
Category 3 – Electricity (storage or direct)
• Properties already using electricity as the main fuel
type
• Flats 
• Properties with double or triple glazed windows 
• Properties in urban areas (1, 2 or 3 in the 8-fold
classification5)
Category 3 – Biomass
• Properties already using biomass as the main fuel
type
• Detached and semi-detached properties
• Properties of a solid brick or stone construction type 
On-Gas Categorisation Process 
4 See Error! Reference source not found. for an explanation of construction types
5 Scottish Government Urban Rural Classification 2020
146

Page 147

13 
As per the off-gas categorisation process but there are no
subcategories for electric and biomass options. 
For detailed descriptions on exact methodology used during the development of this LHEES,
please refer to the Scottish Government issued methodology documentation. Summary of relevant
regional policiesTable 4 sets out any areas where deviations were made from this methodology. 
Table 4: Summary of the deviations (if any) from standard methodology in the LHEES
Considerations.
LHEES
Consideration
Standard methodology Deviation from standard
LHEES method
Off-Gas Grid
Buildings
Categories 0, 1, 2 and 3 properties
determined according to the following
factors:
- Unlisted property
- Not in a conservation area
- Wall insulation
- Double/triple glazed windows
- Wet system replacement (except
electric and no heating/hot water
systems)
- Loft insulation prediction (99mm +) 
Only wall insulation is
considered in determining
Category 1 properties for
all heating types (boilers,
room heaters, storage
heaters, no heating/hot
water systems). 
Additionally identified solar
PV suitability for category
1 properties. 
On-Gas Grid
Buildings
Categories 0, 1, 2 and 3 properties
determined according to the following
factors:
- Unlisted property
- Not in a conservation area
- Wall insulation
- Double/triple glazed windows
- Wet system replacement (except
electric and no heating/hot water
systems)
- Loft insulation prediction (99mm +)
Only wall insulation is
considered in determining
Category 1 properties for
all heating types (boilers,
room heaters, storage
heaters, no heating/hot
water systems).
Additionally identified solar
PV suitability for category
1 properties.  
Poor Building
Energy Efficiency
Energy efficiency score is determined by
wall insulation status, loft insulation status
and double glazing. 
As most programmes and
projects are wall insulation
focused, the weighted
Energy Efficiency map
only includes wall
147

Page 148

14 
insulation potential, not
glazing and loft. 
Poor Building
Energy Efficiency
and Fuel Poverty
Energy efficiency and Fuel Poverty score is
determined by wall insulation status, loft
insulation status and double glazing and
Fuel Poverty.  
As most programmes and
projects are wall insulation
focused, the weighted
Energy Efficiency and
Fuel Poverty map only
includes wall insulation
potential, not glazing and
loft. 
2.3.1 Engagement
The LHEES was developed with engagement from external stakeholders as well as internal
stakeholders from different teams within the Council. The strategy also draws on insights from the
public engagement activities carried out on related strategies, including the Sustainable
Development and Climate Change Strategy (2021-22) and the Local Housing Strategy (2022).
Stakeholder engagement has informed the evidence base and analysis at all stages of the LHEES. 
In the early stages of the LHEES development, the Council set up an LHEES Officer Working
Group with representation from across each Council Resource or Service. Members of the group
were involved in and responsibility for asset or estate management, energy usage or supply. In
addition, officers with expertise in economic development, GIS mapping, energy efficiency and
building decarbonisation were included. A stakeholder mapping exercise was undertaken,
identifying internal and external stakeholders and their levels of interest and influence. The steering
group provided input and reviewed analysis output throughout the LHEES stages. 
The Council will hold events with key stakeholders to discuss the Strategy and Delivery Plan and
will launch an eight-week public consultation on the Strategy before seeking approval from the
Council's Executive Committee on the final version of the document.
3. Achieving net zero 
Developing an LHEES and updating it every five years is a statutory duty for all local authorities.
There are a number of policy drivers behind the need to develop an LHEES, and which have
informed the content of South Lanarkshire’s LHEES. This section outlines the local, regional, and
national policy drivers, as well as setting the scene by outlining the ongoing work in South
Lanarkshire to meet net zero. 
148

Page 149

15 
3.1. Policy drivers
The LHEES takes influence from a range of different policies, strategies, and targets. The following
subsections outlines key policies that are relevant to the LHEES at local, regional, and national
level.
3.1.1 Local policies
South Lanarkshire Council has a number of policies and strategies that are relevant to the LHEES.
These cover topics such as climate change, energy efficiency, fuel poverty and planning.
The following is a list of the most relevant policies. 
Table 5: Summary of relevant local policies and strategies
Name  Description 
Community Plan 2022-2032 Developed by a partnership of public, private, and
community representatives. Sets out key priorities to
improve the lives and prospects for everyone in South
Lanarkshire. Includes priority areas focused on improving
housing quality and energy efficiency.
Connect Council Plan 2022-2027 Sets out how the Council will continue to serve local
communities and residents over the next five years.
Includes objectives to improve the energy efficiency of
housing stock and to minimise impact of fuel poverty and
climate change on people.
Sustainable Development &
Climate Change Strategy 2022-27 
The Council's priorities in its transition to Net Zero and to
achieve sustainable development goals and meet climate
change targets over a five-year period.
Local Housing Strategy 2022-27  The Council’s priorities in relation to housing over a five-
year period. Includes actions to improve energy
efficiency and increase home energy decarbonisation. 
Local Development Plan 2 2020-
2025
Aims to guide future development to improve the quality
of life for everyone in South Lanarkshire. Includes
policies that support the development of heat networks.
Local Development Plan 3 is in preparation.
Strategic Housing Investment Plan
2024-2029 
Affordable housing development priorities which guide
the way in which Scottish Government funding will be
allocated to achieve Local Housing Strategy outcomes.
Child Poverty Action Plan 2022-
2023
Sets out what South Lanarkshire Council is doing to
reduce child poverty. Contains a focus on reducing costs
for families, including energy costs, by improving energy
efficiency. 
3.1.2 Regional plans
149

Page 150

16 
The LHEES recognises the importance of collaboration across local authorities. South Lanarkshire
is one of the eight councils making up the Glasgow City Region and its Strategic Development
Planning Authority, Clydeplan. This strategic partnership has developed regional policy which
informs South Lanarkshire’s LHEES, these policies can be found in Table 6. 
Strategic Development Plans have been replaced with the requirement to develop a Regional
Spatial Strategy (RSS). RSS is a long-term spatial strategy for the strategic development of an
area. Work on Glasgow City Region’s RSS will begin once further guidance has been published by
Scottish Government.
South Lanarkshire Council is also part of Climate Ready Clyde, who have published the Glasgow
City Region Climate Adaptation Strategy and Action Plan.
Table 6: Summary of relevant regional policies
Name Description
Clydeplan Strategic
Development Plan 2017 
Provides a 20-year land use plan for the Glasgow City Region.
Includes policies for housing and delivering low-carbon heat and
electricity, including heat networks.
Glasgow City Region
Climate Adaptation
Strategy and Action Plan
2021
Seeks to guarantee the resilience and prosperity of the Glasgow
City Region economy, society, and environment amid the
challenges posed by the climate crisis. Flagship Action 7
addresses the need for net-zero, climate resilient housing retrofit.
Glasgow City Region
Regional Economic
Strategy (2021) and
Action Plan (2022-23)
Sets out the high-level actions which will support the Region’s key
economic challenges and ambitions. Includes a focus on housing
retrofit. 
3.1.3 National policies and targets
The LHEES is primarily driven by Scotland’s statutory targets for greenhouse gas emissions
reduction and fuel poverty. Several national policies are relevant, particularly the Heat in Buildings
Strategy, the Heat Network Act, and the Fuel Poverty Act. These are outlined in Error! Reference
source not found. and further described in the following section.  
150

Page 151

17 
Name Description Targets/aims
Climate Change
Climate
Change
(Emissions
Reduction
Targets)
(Scotland) Act
2019 
Targets to reduce Scotland's
emissions of all GHGs to net-zero. 
2045: Net zero GHG emissions
2040: 90%
2030: 75%
2020: 56%
Update to the
Climate
Change Plan
2018–2032
Sets out a pathway to deliver our
Scotland’s climate change targets,
including ambitions for Scotland’s
buildings. 
Multiple targets, including:
2030: At least 50% of building
heated using zero emission systems
Housing
Heat in
Buildings
Strategy 2021 
Sets out a pathway to reduce
emissions from buildings and to
remove poor energy performance as a
driver for fuel poverty.
By 2030, majority of buildings should
achieve EPC band C, and 1 million
homes use zero emission heating 
Heat in
Buildings Bill
(currently at
consultation
stage)
Proposed new laws around minimum
energy efficiency standards and
prohibiting direct emissions heating
systems.
Minimum energy efficiency
standards to be met by:
2028 for Private landlords
2033 for owner-occupiers 
Social Housing
Net Zero
Standard
Proposed new energy efficiency
standard that replaces EESSH2.  Sets
a minimum fabric efficiency rating for
each home rented by social landlords.
Under consultation.
2033: Fabric energy efficiency rating 
2045: Clean heating in all socially
rented homes   
Housing to
2040 
Sets out the vision and route map for
housing in Scotland to 2040.
Existing homes are adapted and
retrofitted to improve their energy
efficiency and decarbonise their
heating
Energy
Heat Networks
(Scotland) Act
2021 
Requires local authorities to review
whether one or more heat network in
the local authority is suitable for
construction. 
Achieve a combined supply of
thermal energy by heat networks of:
2030: 6 TWh 
2027: 2.6 TWh
Heat Networks
Delivery Plan 
Sets out how provisions of the Heat
Networks (Scotland) Act 2021 will
contribute to increasing heat networks
in Scotland. 
The targets set out in the Heat
Networks (Scotland) Act 2021.  
Fuel
Poverty Fuel Poverty
(Scotland) Act
2019 
Defines fuel poverty and requires the
creation of strategies to tackle fuel
poverty. 
2040: 
< 5% of households in fuel poverty, 
< 1% in extreme fuel poverty. 
National
Planning
Framework 4 
Sets out Scotland’s spatial principles,
regional priorities, national
developments, and national planning
policy.
Multiple
Table 7 Summary of relevant national policy.
151

Page 152

18 
Heat in Buildings
The Heat in Buildings Strategy, published in 2021, sets out a vision that by 2045 Scotland’s homes
and buildings are cleaner, greener, and easy to heat, and no longer contributing to climate change.
The strategy prioritises improvements to the fabric of buildings to reduce energy demand,
alongside a focus on zero emissions heating systems. This LHEES will contribute to the targets set
out in the Heat in Buildings Strategy by identifying measures for reducing building emissions and
potential heat network zones. 
In the Heat in Buildings Strategy, the Scottish Government committed to the development of a Heat
in Buildings Bill to provide the regulatory framework for zero emissions heating and energy
efficiency. In November 2023, the Scottish Government launched a consultation on the Heat in
Buildings Bills, which proposes a minimum energy efficiency standard for private landlords by the
end of 2028, and for owner-occupiers by 2028. It also proposes a ban on polluting heating systems
in all buildings by 2045. The consultation will close in March 2024.
Standards for social housing
The Scottish Government has established targets to improve the energy efficiency of social
housing. Previously, these have been set through the Energy Efficiency Standard for Social
Housing (EESSH). EESSH2 guidance required all social housing to meet an energy efficiency
rating of EPC band B by 2032. EESSH2 has been under review to realign the standard with net
zero targets and the 2032 milestone has been put on hold.
In November 2023, the Scottish Government launched a consultation on a new Social Housing Net
Zero Standard which will replace EESSH2. The proposed new standard includes setting a
minimum fabric efficiency rating (different to current EPC rating) and introducing a requirement to
replace polluting heating systems with clean alternatives by 2045.
Heat Network Act
The act requires local authorities to review areas that are potentially suitable for heat networks
within their constituency. This LHEES will function as the main vehicle by which South Lanarkshire
Council will carry out this review.
Heat networks supply multiple buildings with heat or cooling from a central source or sources. This
avoids the need for individual boilers or electric heaters in every building. 
The Heat networks (Scotland) Act 2021 defined a heat network to mean either a district heat
network or a communal heating system and provides the legislative framework to both set up and
regulate heat networks. The act requires local authorities to review areas that are potentially
suitable for heat networks within their constituency. This LHEES will function as the main vehicle
by which South Lanarkshire Council will carry out this review.
Fuel poverty
The Fuel Poverty Act was passed by the Scottish Parliament in 2019. It defined a household as
being in fuel poverty if fuel bill costs exceed 10% of the household income. A household is defined
as being in extreme fuel poverty if fuel costs are in excess of 20%. The first set of targets laid out in
152

Page 153

19 
this legislation are that by 2030 no more than 15% of households in Scotland are in fuel poverty
and no more than 5% are in extreme fuel poverty. Homes with a lower energy efficiency were
identified as one of the key drivers of fuel poverty and the LHEES looks to address this pressing
issue. By improving the energy efficiency of homes, a reduction in fuel costs can be expected.
LHEES can therefore provide support to reducing fuel poverty by mitigating energy efficiency as a
driver.
EPC reform
To date, Scotland’s energy efficiency targets have been articulated through EPC ratings. Recently,
limitations of this approach have been highlighted6. One limitation is that the EPC rating is a cost
efficiency rating, where the cost of using the heating system is a factor in the rating. This makes
the rating less useful for setting targets for the energy demand of buildings.
The Scottish Government has launched a consultation on EPC reform7. It proposes to introduce a
range of new metrics, including a fabric rating, which will specifically focus on the fabric
performance in terms of heat loss. Recent consultations on minimum energy efficiency standards
for buildings indicate that this rating may be used. 
3.2. Progress to net zero in South Lanarkshire
The LHEES will build on work already taking place within South Lanarkshire to reduce emissions.
This section provides an overview of some of the activity to date which will help South Lanarkshire
to achieve net zero. 
3.2.1 Within South Lanarkshire Council
Sustainable Development and Climate Change Strategy (SDCCS): The Council’s SDCCS was
developed following extensive public engagement and is focussed on addressing climate related
issues. Sustainable development typically includes three pillars: environmental, social, and
economic. The focus for SDCCS is mainly on the environmental pillar. This strategy focuses on the
period 2022 to 2027, it also sets the pathway through to the end of this decade.
Carbon Management: South Lanarkshire Council has committed to a zero direct emissions target
by 2038 for its non-domestic buildings. The term ‘direct’ emissions refer to fossil fuels consumed at
source, for the Council’s carbon footprint this includes the gas and oil used in buildings and the
fossil fuel used to power fleet vehicles. This target is in line with the ambitious public sector targets
detailed in Scotland’s Climate Change Plan and Scotland’s Heat in Buildings Strategy. 
Strategic Energy Review: The Council undertook a Strategic Energy Review in 2015, which was
updated in 2021. The review provides advice to the Council on how to meet its climate change
aspirations and obligations, and recommendations from the first report have been implemented. 
6 Climate Change Committee - Reform of domestic EPC rating metrics to support Net Zero 
7 Scottish Government - Energy Performance Certificate (EPC) reform: consultation 
153

Page 154

20 
The review demonstrates that the Council has consistently met, or exceeded, its annual 2% carbon
emission reduction targets year-on-year. 
Achieving standards for social housing: South Lanarkshire has made significant investments to
improve the energy efficiency of its housing stock. The Council met the Scottish Housing Quality
Standard (SHQS) by the deadline of April 2015 through major investment. 
Due to this investment the majority of council-owned homes have an energy efficiency rating of
EPC Band C or above, meeting the first phase of the Energy Efficiency Standard for Social
Housing (EESSH).
EESSH2 has been implemented since December 2020. It seeks to ensure social rented properties
achieve the equivalent of EPC Band B or above where it is practically possible to do so. The
original EESSH2 milestones of 2025 and 2032 are currently on hold while the standard is reviewed
to ensure alignment with the 2045 Net Zero target. In accordance with the interim guidance on
EESSH28, South Lanarkshire Council will prioritise zero direct emission heating systems for
council-owned properties where the heating system is due for replacement during the review
period.
Currently, 6% of South Lanarkshire Council’s stock reaches the energy efficiency (EE) rating of
band B required for EESSH2 compliance. This is slightly lower than national levels of 7%. The
majority of South Lanarkshire Council’s properties currently have an EE band C (85%). The
Council has worked with Changeworks to understand the potential impact and cost of fabric and
heating system upgrades, as well as solar PV and battery storage installations. The estimated cost
was £235 million. Similar analysis will be required for the new Social Housing Net Zero Standard
(SHNZS). 
All new council homes are built to the Silver Greener Standard, meaning that tenants benefit from
lower energy bills.
3.2.2 Beyond the Council’s buildings 
Area Wide Emissions
The Council worked with consultants to understand how to measure and reduce area-wide carbon
emissions for South Lanarkshire. The work established a baseline position and identified high-level
actions to help the Council meet its long-term targets. 
LHEES Pilot
As part of the development of the standardised methodology for LHEES the Council worked with
Changeworks to deliver a pilot project as part of the second phase in 2018/2019. The pilot
focussed on opportunities for electrification and solar generation in off-gas areas, specific 
8 Energy Efficiency Standard for Social Housing post 2020 (EESSH2) review: interim guidance for social
landlords 
154

Page 155

21 
challenges in the private rental sector, and mapping out all the sectors and building types that
would need to be addressed.
Private Tenure housing
Energy Efficient Scotland: Area Based Schemes (ABS): ABS is a Scottish Government scheme
that provides funding for local authorities to deliver energy efficiency programmes in areas with
high levels of fuel poverty. South Lanarkshire Council has delivered ABS schemes since 2013. In
this time over 4,000 insulation measures have been installed in South Lanarkshire homes. The
majority of these installations have been in owner-occupied homes. 
Energy Company Obligation (ECO) and Great British Insulation Scheme (GBIS): The Energy
Company Obligation (ECO) was first introduced in 2013 and places legal obligations on energy
suppliers to deliver energy efficiency measures to domestic premises. The Great British Insulation
Scheme (GBIS) was launch in September 2023, both schemes are UK Government energy
efficiency schemes that supports private tenure households on low income and vulnerable
households. The aims of the schemes are to improve the least energy efficient homes and helping
to meet the Government’s fuel poverty and net zero commitments. Local Authorities are invited to
participate in these schemes.  
South Lanarkshire Council participates in both the ECO4 and GBIS which run until March 2026.
The Council has published a Statement of Intent (SOI)9 which outlines the eligibility criteria. The
ECO4 scheme will focus on supporting low income and vulnerable households. The scheme will
improve the least energy efficient homes and will take a whole house approach installing multiple
energy efficiency measures. The GBIS will support the ECO4 scheme in the delivery of
predominantly single measures targeted at a wider range of households.
ECO Flex and GBIS Flex are household referral mechanisms within the schemes to allow local
authorities to widen the eligibility criteria and to improve targeting of energy efficiency measures.
In the four years between 2018/19 and 2021/22, 5,526 measures in 2,603 owner-occupied
properties have been funded through ECO in South Lanarkshire. 
4. Current Building Stock
This section provides an overview of the building stock in South Lanarkshire. This baseline allows
the Council to create an effective strategy and to measure progress towards targets and the
ultimate target of net zero by 2045. 
Based on information within the Home Analytics dataset (version 3.7, 2021), South Lanarkshire
has a total number of 153,000 domestic properties. Age, dwelling type, wall construction, tenure, 
9 South Lanarkshire ECO Flex 
155

Page 156

22 
and heating fuel are key factors that impact energy performance, operational costs, and living
conditions in buildings.  
Home Analytics data for South Lanarkshire has been used to benchmark key property statistics
against overall national statistics found in the Scottish House Condition Survey, 202110.
4.1. Domestic buildings
Property age and construction type
Property age can be used to predict construction type which is useful when planning appropriate
retrofit interventions across a large number of buildings. The majority of properties within South
Lanarkshire are of cavity construction (Table 9). This provides an opportunity as fabric measures
can be standardised and installed at scale as construction methods, moisture mitigation processes
and material types are well-understood. However, as discussed below, there will be a range of
different thermal performances within this archetype.
Table 8: Property ages per property type within South Lanarkshire
Property Type 1919-
1949
1950-
1983
1984-
1991
1992-
2002
Post-
2002
Pre-
1919
Total
Detached house 1,638 8,409 3,238 6,740 10,148 3,919 34,092
Semi-detached house 6,053 13,810 1,677 2,782 3,390 3,077 30,789
Mid-terraced house 1,623 19,139 939 724 1,154 1,740 25,319
Small block of flats/dwelling
converted in to flats
8,481 6,778 926 952 1,113 2,498 20,748
Block of flats 656 11,199 762 1414 3,035 1,310 17,614
End-terraced house 1,232 11,780 721 670 1,173 965 16,541
Large block of flats 16 3,789 242 952 4,309 30 9,338
Flat in mixed use building 166 872 205 163 563 1,636 3,605 
10 Introduction - Scottish House Condition Survey: 2021 Key Findings - gov.scot (www.gov.scot)
156

Page 157

23 
Figure 2: Property types by age of building in South Lanarkshire 
Table 9 Construction types of properties within South Lanarkshire
Cavity Timber Frame Solid brick or stone System built
Insulated Uninsulated Insulated Uninsulated Insulated Uninsulated Insulated Uninsulated
66,318
(42%)
27,378
(17%)
26,235
(17%)
5,241 
(3%) 
6,670
(4%)
16,786
(11%)
4,828
(3%)
5,352  
(3%) 
0
5000
10000
15000
20000
25000
30000
35000
40000
Detached house
Semi-detached house
Mid-terraced house
Small block of flats/dwelling
converted in to flats
Block of flats
End-terraced house
Large block of flats
Flat in mixed use building
Distribution of property ages within property types in South Lanarkshire
Pre-1919 1919-1949 1950-1983 1984-1991 1992-2002 Post-2002
157

Page 158

24 
Figure 3: Insulation status by construction type within South Lanarkshire  
Understanding construction types
Properties built before 1919 are likely to be of a solid wall construction, from brick or stone, with
timber floor and roof construction. Stone buildings are likely to have a high conservation value, at
might be within conservations areas or listed. Retaining the facing stone in such buildings is often
essential to the character of the area, however it also presents unique retrofit challenges and is
expensive. 
Cavity wall construction became more commonplace from the 1920s onwards and is still built
today. Like traditional construction, cavity wall construction commonly uses timber for floor and roof
0 20,000 40,000 60,000 80,000 100,000
System built
Solid brick or stone
Timber frame
Cavity
Property Construction Type in South Lanarkshire
Insulated Uninsulated
158

Page 159

25 
construction. Walls are constructed in two, rather than a single leaf. In comparison to solid wall
construction, unfilled cavity walls are almost twice as thermally efficient. Additionally, cavity wall
constructed properties are much more likely to incorporate damp proof courses (DPCs) and
Portland cement than traditionally constructed properties. More recent cavity wall constructed
properties (post-1980) are likely to have partially filled cavities.
System-built usually refers to post-war non-traditional construction housing that is not cavity wall
constructed. It is generally found in mass social house building programmes of the period. Such
housing is normally utilitarian in design with low conservation value. This is advantageous
regarding potential external wall insulation interventions; however, these properties have a range of
unique designs making standardised retrofit plans challenging.  
In Scotland, timber frame construction superseded cavity wall construction as the primary method
of housebuilding in the early 1980s. The proliferation of timber frame construction in Scotland has
coincided with the incremental increase of insulation standards. Older properties may have minimal
mineral wool insulation between timber studs whereas newer properties may have up to 140mm of
phenolic foam or air tightness barriers. Increasing insulation standards have been the main driver
in the increase in depth of the timber structure, with older properties having around 75mm timber
studs in comparison to 140mm in modern buildings.
Loft Insulation
Levels of loft insulation in properties in South Lanarkshire. 
Figure 4: Loft Insulation status within South Lanarkshire 
159

Page 160

26 
Window Glazing
Types of glazing in properties in South Lanarkshire. 
Figure 5: Window glazing status within South Lanarkshire
Tenure
Property tenure will have a direct impact on the pace and extent of retrofit installations across
South Lanarkshire. Specific tenure-targeted policies such as EESSH2 have been proven to
accelerate change. Conversely, the private sector has seen slower progress due to property
owners not seeing a strong return on capital investment without government stimulation. 
Table 10: Tenure split of properties within South Lanarkshire
Owner Occupied Local Authority Privately Rented Housing Association
111,324 (~70%) 27,506 (~17%)  14,404 (~9%) 5,574 (~4%) 
160

Page 161

27 
Figure 6: Property tenure split within South Lanarkshire 
Just under a fifth of the domestic properties in South Lanarkshire are social housing. While these
properties are eligible for various government funding streams targeted at retrofit, the existing
funding is not sufficient to meet the energy efficiency requirements while keeping rents affordable.
This is a challenge for the social housing sector. 
The majority of properties are owner occupied or private rented which indicates developing a
retrofit strategy for properties outside of council-ownership is essential to meet net zero.
Mixed tenure provides an additional retrofit challenge due to multiple owners within the same
property, this impacts around of fifth of the total housing stock. This can delay or reduce the extent
of retrofit carried out due to different priorities or capital investment plans for the property owners.
Council-owned properties in this category could be targeted first to develop a retrofit plan
addressing challenges and opportunities. 
Table 11: Mixed tenure properties within South Lanarkshire
Mixed Tenure Properties
No Yes
128,634 (81%) 30,174 (19%) 
5,574
4%
27,506
17%
111,324
70%
14,404
9%
Tenure split of properties within South Lanarkshire
Housing Association Local Authority Owner Occupied Privately Rented
161

Page 162

28 
Figure 7: Mixed tenure split within properties in South Lanarkshire  
30,174
19%
128,634
81%
Split of mixed tenure properties in South Lanarkshire
Yes No
162

Page 163

29 
Fuel Poverty
Data from the Scottish House Condition Survey (Box 1) and the Scottish Index for Multiple
Deprivation (SIMD) (Box 2) have been used to assess fuel poverty within South Lanarkshire. 
South Lanarkshire had one of the lowest rates of fuel poverty in Scotland in 2017-1911, with an
overall percentage below the national average. However, a fuel poverty rate of 22% is still high,
and not on track for meeting the national target of <5% by 2040. Additionally, the gap between
South Lanarkshire’s fuel poverty rate and the national average has narrowed considerably over the
past five years (Table 12). However, due to a change in how fuel poverty is defined in 201912, direct
comparisons cannot be drawn with the statistics published prior to 2016-2018. 
The average rate of 22% will include areas with much higher concentrations of fuel poverty, as
demonstrated in Map 6. South Lanarkshire has substantial rural areas, which are potentially at
greater risk of fuel poverty (See 5.1.1 for more detail).   
It is difficult to identify the exact reasons for the lower-than-average fuel poverty rates, as fuel
poverty is a function of several variables including income and how energy is used in the home;
neither of which have been analysed as part of the LHEES. Fuel poverty is also driven by the
energy efficiency of homes and by fuel prices. As shown in Error! Reference source not found.,
15% of South Lanarkshire’s owner-occupied homes are an EPC Band B, suggesting that homes in
South Lanarkshire are generally more energy efficient than the national average. However, this
trend is not seen across private and social rented homes, which generally have poorer energy
efficiency levels than the national average.  
Furthermore, the rate of fuel poverty is likely to have worsened since 2019 due to the recent cost of
living crisis and energy price crisis. 
11 Scottish House Condition Survey: Local Authority Analysis 2017-2019 
12 Fuel Poverty (Targets, Definition and Strategy) (Scotland) Act 2019
Box: 1 Scottish House Condition Survey: Fuel Poverty Data
In this dataset, a household is classified as fuel poor if, in order to maintain a satisfactory
heating regime, total fuel costs necessary for the home are more than 10% of the household’s
adjusted net income (after housing costs), and if after deducting fuel costs, benefits received
for a care need or disability and childcare costs, the household’s remaining adjusted net
income is insufficient to maintain an acceptable standard of living.1
163

Page 164

30 
Table 12 Scottish House Condition Survey figures showing the three-year average fuel poverty
rates across South Lanarkshire and Scotland   
Figure 8: Three-year average fuel poverty rate across South Lanarkshire relative to the Scottish
national. Note that from the years 2016-18 onwards, the definition of fuel poverty differed to the
previous years.
26% 25%
23%
20% 22%
0%
5%
10%
15%
20%
25%
30%
35%
40%
2013-15 2014-16 2015-17 2016-18 2017-19
Comparison of three-year average fuel poverty rates across South
Lanarkshire and Scotland
South Lanarkshire Scotland
Households 2013-15 2014-16 2015-17 2016-18 2017-19
South Lanarkshire 26% 25% 23% 20% 22%
36,000 36,000 33,000 30,000 32,000
Scotland 34% 34% 27% 25% 24% 
[Old fuel poverty definition] [New fuel poverty definition]
164

Page 165

31 
In a national context, South Lanarkshire is the tenth most deprived area out of 32 local authorities,
based on the SIMD analysis carried out. A total of 31,590 properties in South Lanarkshire fall within
SIMD deciles one and two. Just under half of the total properties owned by the Council fall into this
category. This illustrates a strong link between the social housing tenure type and areas with high
SIMD scores. With a priority of alleviating fuel poverty, South Lanarkshire Council has used the
LHEES process to investigate areas of high probability of multiple deprivation in conjunction with
category one properties. This is detailed in the Delivery Plan. 
Table 13: SIMD statistics covering deciles one and two within the local authority
Owner Occupied Local Authority Privately Rented Housing
Association
15,975 (10%) 10,310 (6%) 2,733 (2%)  2,574 (2%) 
Box: 2 Scottish Index for Multiple Deprivation as a proxy for fuel poverty
The Scottish Index for Multiple Deprivation (SIMD) dataset has been used assess fuel poverty
within South Lanarkshire. SIMD is a standard tool for identifying areas with relatively high
levels of deprivation and was published in 20201. The SIMD:
• Is a relative measure of deprivation across small areas in Scotland.
• Looks at multiple deprivation. 'Deprived' does not just mean 'poor' or 'low income'. It can
also mean people have fewer resources and opportunities, for example in health and
education. 
SIMD data can be used to:
• Compare overall deprivation of small areas.
• Compare the seven domains of deprivation.
• Compare the proportion of small areas in a council region that are very deprived.
• Find areas where many people experience multiple deprivation.
• Find areas of greater need for support and intervention. 
SIMD data is split into ten deciles covering the whole population, where one is most deprived
and ten is least on the scale.
165

Page 166

32 
Figure 9: Tenure split amongst SIMD Decile One and Two Properties within South Lanarkshire  
2,574
8%
10,310
33%
15,975
50%
2,733
9%
Tenure split of properties within SIMD Deciles One and Two within
South Lanarkshire
Housing Association Local Authority Owner Occupied Privately Rented
166

Page 167

33 
Primary Fuel Type
Generally, the domestic housing stock aligns with national averages in relation to primary fuel type
with a slightly higher proportion of properties using electricity as a primary fuel type.
Table 14: Primary fuel type statistics for domestic properties in South Lanarkshire
Primary Fuel Type South Lanarkshire Scotland
Mains gas ~127,840 (81%) 2,016,000 (82%)
Electricity ~20,423 (13%) 262,000 (11%)
Oil ~7,115 (4%) 129,000 (5%)
LPG ~1,525 (1%) 18,000 (1%)
Biomass / Solid Fuel ~1,096 (1%) 36,000 (1%) 
Figure10: Primary fuel types across properties in South Lanarkshire relative to the Scottish national
average. 
127,840
20,423
7,115
1,525 1,096
1
10
100
1,000
10,000
100,000
1,000,000
10,000,000
Mains gas Electricity Oil LPG Biomass / Solid
Fuel
Primary Fuel Type in South Lanarkshire and Scotland
South Lanarkshire Scotland
167

Page 168

34 
EPC data
Generally, the social housing sector housing in South Lanarkshire currently has lower EPC ratings
when compared to national averages. This is at odds with the various policy drivers for the sector
and suggests that these are not having the desired impact in relation to retrofit. Just under a
quarter (20%) of social housing properties are in the poorest performing EPC bands E-G, this is
significantly higher than the national average of 7%.
Owner occupied properties in South Lanarkshire have almost four times the proportion of EPC
band B properties (15%) when compared to the national average (4%). This may be linked to lower
fuel poverty rates in the area.
Table 15: EPC data for domestic properties in South Lanarkshire
EPC Band Owner Occupied Private Rental Social Housing  
SLC Scotland SLC Scotland SLC Scotland
A (92-100)  0% 0% 0% 0% 0% 0%
B (81-91)  15% 4% 7% 7% 6% 6%
C (69-80)  47% 43% 35% 43% 36% 59%
D (55-68)  28% 38% 40% 35% 38% 28%
E (39-54)  8% 11% 13% 9% 15% 6%
F (21-38)  2% 3% 4% 5% 5% 1%
G (1-20)  0% 1% 1% 1% 0% 0% 
168

Page 169

35 
Figure 11: Split of EPC bands across all property tenures in South Lanarkshire relative to the
Scottish national average.
Carbon emissions
Carbon emissions across the national housing stock remains relatively consistent between 67.4
kg/m² and 70.5kg/m² across all dwelling types (Error! Reference source not found.). This varies
considerably for housing in South Lanarkshire, in particular tenement and terraced housing. 
Terraced housing has ~41% higher carbon emissions per m² when compared to the national
average. Poorer energy efficiency and a higher proportion of carbon intensive primary heat source
are two potential reasons why terraced houses in South Lanarkshire contribute higher carbon
emissions per m².
On the other hand, tenements in the area have 23% lower carbon emissions suggesting improved
energy efficiency or a higher proportion of tenements with lower carbon heat sources.
In general, the dwellings are larger in South Lanarkshire at 117m², compared to 97m² nationally.  
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
A (92-100) B (81-91) C (69-80) D (55-68) E (39-54) F (21-38) G (1-20)
EPC Data for Domestic Properties in South Lanarkshire Relative to
National Statistics
Owner Occupied Private Rental
Social Housing Owner Occupied (Scotland)
Private Rental (Scotland) Social Housing (Scotland)
169

Page 170

36 
Figure 12: Carbon emissions (kg/m²) for each dwelling type in South Lanarkshire    
119.2
70.1
60 59.8
51.7
72.270.4 68.2 70.5 69.8 67.4 69.3
0
20
40
60
80
100
120
140
Terraced Other flats Detached Semi-detached Tenement All dwelling
types
Carbon Emissions (kg/sqm)
SLC - Carbon Emissions (kg/sqm) National Average - Carbon Emissions (kg/sqm)
170

Page 171

37 
4.2. Non-domestic buildings
Table 16 below shows that non-domestic buildings in South Lanarkshire require significantly more
heat than for domestic properties, equivalent to 76% of the total heat demand. 
Figure 43: Breakdown of domestic and non-domestic building counts in South Lanarkshire 
Table 16: Total heat demand for domestic and non-domestic buildings in South Lanarkshire
Non-domestic total heat
demand (MWh/yr)
Domestic total heat demand
(MWh/yr)
Total heat demand
(MWh/yr)
513,110 (76%) 158,000 (24%) 671,110 
Figure 5 below demonstrates the correlation between number of properties and heat demand is not
always directly proportional and is dependent on property end use. Non-domestic typologies such
as hotels, leisure facilities, industry, education, and community centres have larger average
heating demands per property when compared to offices and retail premises for example. 
8737
1169
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Privately Owned Public / LA Owned
Count of Privately Owned vs Public / LA Owned Properties
171

Page 172

38 
Figure 5: Non-domestic property count and heat demand
Between them, offices and retail premises make up 43% of the non-domestic properties within
South Lanarkshire, while only contributing to 22% of the total non-domestic heating demand
requirements.
Although, sports and leisure facilities make-up a relatively low number of properties 290 (3%), they
contribute to 8% of the heating demands. This is likely due to high intensity heating requirements
associated with activities such as heating swimming pools. 
Primary Fuel Type
Over half of non-domestic properties across South Lanarkshire use electricity as their main fuel
source, a total of 5,616 properties (Table 17). 
Table 17: Non-domestic property count by main fuel type
Electricity Mains Gas Oil Other
5,616
(57%)
3,082
(31%)
1,149
(12%)
56
(0%) 
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
0
500
1000
1500
2000
2500
Retail
Offices
Light manufacturing /…
Cafes, pubs,…
Storage / distribution
Other
Education
Clubs and…
General sports &…
Residential
Heavy manufacturing…
Health
Places of worship
Hotels
Museums, art…
Emergency services
Large entertainment…
Military and prison
Non-domestic property count and heat demand
Property count Heating demand (MWh/yr)
172

Page 173

39 
Figure 65: Main fuel type split across all non-domestic properties within South Lanarkshire
Mains gas is used to meet 57% of the total heat demand for non-domestic properties in South
Lanarkshire, providing 291,454MWh/yr of heat (Table 17). This means that properties which use
gas as a main fuel type have a higher average demand than those that use electricity. 
Figure 76: Heat demand by main fuel type split within South Lanarkshire 
5,616
3,082
1,149
56
0
1,000
2,000
3,000
4,000
5,000
6,000
Non-domestic property count by main fuel type
Electricity Mains gas Oil Other
291,454
172,376
44,189
5,091
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
Mains gas Electricity Oil Other
Heat demand by main fuel type split
173

Page 174

40 
Table 18 Heat demand by main fuel type (MWh/yr) 
Mains gas Electricity Oil Other
291,454
(57%)
172,376
(34%)
44,189
(9%)
5,091
(<1%) 
4.3. Heat pump suitability
The analysis carried out at Stage 3 of the LHEES development identifies buildings’ heat pump
suitability, both in areas with existing gas infrastructure and those without. The categories are
defined in the Scottish Government’s LHEES guidance and are based on indicators from the Home
Analytics dataset. Table 3 provides a brief description of each category and the process for
categorising all domestic properties. Heat pump suitability, both in areas with existing gas
infrastructure and those without.
The following maps indicate properties in Category 1 - “Heat pump ready” buildings that are well-
suited to heat retrofit with minimal other changes, in both on and off gas areas.   
Map 1 Council properties On Gas Grid in Category 1- “Heat pump ready” buildings
174

Page 175

41 
Map 2 Private properties On Gas Grid in Category 1- “Heat pump ready” buildings 
Map 3 Council properties Off Gas Grid in Category 1- “Heat pump ready” buildings
175

Page 176

42 
Map 4 Private properties Off Gas Grid in Category 1- “Heat pump ready” buildings
4.4. Heat network development
South Lanarkshire Council is already investigating the feasibility of heat networks in two areas. A
feasibility study has been conducted by an external consultant for a heat network in Hamilton,
around Almada Street and the surrounding area. This feasibility study shows that there is an
opportunity for a heat network here. This opportunity is detailed in the LHEES Delivery Plan
(priority indicative heat network zone 1). 
South Lanarkshire Council has also investigated the options for decarbonising the six tower blocks
in Calderwood, East Kilbride. The feasibility study, conducted by an external consultant, concluded
that the site has scope to develop a heat network beyond the two clusters of tower blocks. 
176

Page 177

43 
5. South Lanarkshire’s LHEES
Priorities 
South Lanarkshire Council’s key priorities for this LHEES have been informed by the six LHEES
considerations, the local policy context, stakeholder engagement and analysis of the building stock
in South Lanarkshire. 
5.1. Priority 1: Reduce heat demand using a fabric first
approach to improve the condition and energy efficiency
of housing across all tenures to ensure that poor energy
performance is removed as a driver of fuel poverty. 
Reducing heat demand simultaneously addresses fuel poverty and climate change as it results in
lower carbon emissions and can reduce heating bills. A ‘fabric first’ approach to retrofit prioritises
making the building envelope (walls, roof, floor, doors, windows) thermally efficient, alongside
repairs and improvements to the building condition. This reduces a building’s heat demand before
a decarbonised heating system is installed. 
Map  gives an illustration of the areas of South Lanarkshire with domestic properties with low
levels of energy efficiency. This is indicated by the level of uninsulated walls in each datazone. As
shown in the map, the areas with the highest levels of uninsulated walls are Cambuslang Central,
Shawfield and Clincarthill, and Mossneuk and Newlandsmuir.
177

Page 178

44 
Map 5 Energy efficiency of domestic properties in South Lanarkshire. The weighted scores indicate
the level of uninsulated walls in each datazone. A higher weighted score indicates lower levels of
energy efficiency. 
5.1.1. Fuel Poverty
It is widely recognised that fuel poverty links closely with other forms of poverty. South Lanarkshire
Council will continue to work with housing, health, and homelessness partners to support those
households who are at risk of fuel poverty. Through a community planning approach, the Council
will seek to ensure that the right type of advice and support is provided to households who need it
through money advice and advocacy partners.
Actions to tackle fuel poverty are led through the Financial Inclusion Networks’ Fuel Poverty Sub-
Group. Chaired by the Council’s Money Matters Advice Service, this group aims to raise
awareness of issues between services and identify solutions to help households who may be
impacted by fuel poverty. Membership consists of representatives from across council services, the
Health and Social Care Partnership, Home Energy Scotland, Energy Action Scotland, Citizens
Advice Scotland, and a range of other third sector partners and services. Short term actions such
as identifying grants for eligible households are taken forward alongside longer, strategic
discussions on how best to support households across all tenures.
178

Page 179

45 
South Lanarkshire Council is committed to reducing levels of child poverty. The Council recognises
that the cost of energy means that family budgets are stretched further than ever. Addressing poor
energy efficiency is a key part of the Council’s commitment to “provide support to South
Lanarkshire’s families in order to tackle child poverty head on”13.
South Lanarkshire has substantial rural areas, which are potentially at greater risk of fuel poverty
due to the particular rural dimensions identified in the Scottish Rural Fuel Poverty Task Force
Action Plan in 2016, and the 2023 Changeworks report A Perfect Storm: fuel poverty in rural
Scotland.
Map  shows the probability of fuel poverty across South Lanarkshire. This is only an indication of
the number of properties at risk of fuel poverty as a result of poor building energy efficiency. It does
not account for the other variables that are drivers of fuel poverty (household income, energy bills
and how energy is used in the home). The map shows that the areas with the highest risk of fuel
poverty due to poor energy efficiency are Clydesdale South, Merryton and Meadowhill, and
Shawfield and Clincarthill. However, poor building energy efficiency alone should not be used as
an indicator of fuel poverty risk, as it may highlight affluent areas with poor building energy
efficiency. For this reason, South Lanarkshire Council has instead used SIMD data as a proxy
indicator for fuel poverty (as detailed in Error! Reference source not found. and the Delivery
Plan). 
13 South Lanarkshire's Local Child Poverty Action Plan Report 2022/23
179

Page 180

46 
Map 6 Risk of fuel poverty due to low energy efficiency in South Lanarkshire. The higher weighted
scores indicate poor energy efficiency, which is associated with a higher risk of fuel poverty.  
5.1.2. Mixed-tenure properties
For mixed-tenure and mixed-use (including the non-domestic sector) properties, whole-building
level solutions are likely to be the most effective way to reduce emissions caused by heating. This
is challenging as it requires the co-operation of multiple owners, but Scotland does not yet have
robust systems in place to support and encourage this. For example, there is a lack of building
management structures such as owners’ associations. Another key challenge to the retrofit of
these buildings is that currently we cannot undertake energy assessments at a whole building level
to assess and make appropriate recommendations for communal works for both energy efficiency
work and communal heating systems14.  
Mixed-tenure properties are a priority for South Lanarkshire in recognition that early action is
required to overcome these challenges. There are a total number of 9,379 mixed-tenure properties
in South Lanarkshire, approximately 6% of the housing stock. For the first LHEES, mixed-tenure
buildings where the Council is the factor will be prioritised, as well as other blocks containing social 
14 ClimateXChange (2023) Whole building assessment for energy efficiency and zero direct emissions heat
in multi-owner and mixed-use buildings 
180

Page 181

47 
housing. This is because social landlords are in a position to facilitate the retrofit of multi-
occupancy blocks. 
Mixed-tenure blocks feature in the Council’s existing capital programme investment plans for
external fabric repairs and energy measures. The plans will be updated to include appropriate
retrofit measures. This includes development of a plan for non-traditional and hard to treat mixed
tenure blocks. Where possible, the Council will utilise ABS funding to assist private tenure
properties in mixed-tenure blocks with the costs.
Map  illustrates the number of uninsulated walls in mixed-tenure buildings across South
Lanarkshire. The data shows that the datazone Burgh, Eastfield and Silverbank has the highest
level of uninsulated walls in mixed-tenure properties. This is closely followed by Uddingston and
Gardenside, and Hamilton Centre and Low Parks. 
Map 7 Uninsulated walls in mixed-tenure properties. 
181

Page 182

48 
5.2. Priority 2: Transition to zero direct emissions heating
systems in buildings across South Lanarkshire to tackle
climate change.
South Lanarkshire’s first LHEES is following a low-regrets approach toward building-level
decarbonisation of heating. This means continuing to follow a fabric first retrofit strategy, and
initially targeting heating system upgrades in buildings that are already highly suitable for heat
pumps (e.g., well insulated properties with a wet heating system). 
The two priorities for transitioning to zero direct emissions heating (ZDEH) systems in South
Lanarkshire’s homes are:
2a: South Lanarkshire Council will lead by example by transitioning all council-owned
properties to ZDEH, and no longer install gas boilers. 
2b: South Lanarkshire Council will actively support, encourage, and enable owner-
occupiers and private sector landlords to retrofit homes.  
The Council will educate, encourage and influence, where possible, private households to make
their homes more energy efficient. This will include referrals for ECO funding and inclusion in ABS
schemes, as well as working alongside active community groups to engage with homeowners on
climate action. 
5.2.1. Off-gas areas
Off-gas homes that currently use high emissions oil, LPG, and solid fuels are a priority for
converting to zero emissions heating. South Lanarkshire’s LHEES will initially focus on low-regrets
deployment of individual building heat pumps in buildings off the gas network, particularly those
currently using high carbon heating fuels. Heating upgrades to low carbon heating systems such
as heat pumps can most easily be carried out in well-insulated properties which do not require the
installation of additional heat emitters such as radiators (category 1 properties).
Looking ahead, South Lanarkshire will also prioritise properties with secondary potential for heat
pump retrofit, for example those requiring moderate fabric upgrades or the addition of wet
distribution systems. In prioritising these ‘category 2’ properties, the LHEES is providing clear
market signals in order to build a pipeline of work and support the development of the retrofit
supply chain.
5.2.2. On-gas grid buildings
Buildings connected to the gas grid are more likely than off-grid buildings to be connected to heat
networks in the future. However, a large proportion of on-gas buildings will need to transition to
individual building-level low carbon heating systems such as heat pumps. 
South Lanarkshire Council will lead by example, and for its own housing stock will no longer
programme gas boiler replacements apart from in exceptional cases (catastrophic failure, for
example, where there is no time to install a zero-emissions heating system).
182

Page 183

49 
The Council will work to support registered social landlords, private sector landlords and owner-
occupiers to install heat pumps in heat pump ready properties and those requiring some upgrades
to enable heat pump installation (see Delivery Plan). 
Several initiatives already exist to deliver this support. The Council hosts a Private Landlord Forum
twice a year with around 50-60 landlords usually in attendance. At the forum, the Council has
provided sessions in conjunction with Home Energy Scotland covering new targets and standards
for private sector housing, as well as how private landlords can access grant funding or support to
upgrade their heating or properties to comply.
The Council has also produced an AHSP guide to help tenants understand how to operate their
new heating as efficiently as possible, which has been shared with registered social landlord
partners.
Going forward, the Council will work with the newly formed Lanarkshire Climate Action Hub to
engage interested community organisations and building owners to aid future community action
around energy efficiency and retrofitting. The Council will also signpost private rented sector
landlords and owner occupiers to Scottish Government funding schemes for heat pump
installation.
5.3. Priority 3: Make greater use of heat networks as part
of the wider just transition to net zero.
Heat networks have also been identified as a low-regrets decarbonisation technology in the
Scottish Government’s Heat in Buildings Strategy. Nearly 80% of people in South Lanarkshire live
in urban areas which may be well suited to heat networks. The deployment of heat networks will be
a key mechanism in delivering net zero carbon and therefore is a priority focus for this first iteration
of the LHEES.
Section 47 of the Heat Networks (Scotland) Act places a duty on local authorities to consider
undertaking the designation of heat network zones. These are the areas most suited to a heat
network.
The LHEES Delivery Plan indicates some potential heat network zones. These will require further
investigation before a decision is taken on whether each zone is suitable for the construction and
operation of a heat network. Suitable zones will then be designated as heat network zones,
meaning that operators can apply for a permit for exclusive use for a specified number of years. 
Heat Network Opportunities
Heat networks are a heat supply technology which deliver heat to multiple properties. Heat can be
supplied by a range of different technologies. This could include heat generated from boilers (gas
or biomass fired, combined heat and power (CHP)), or from heat pumps. They can also use
183

Page 184

50 
recovered or waste heat from industrial processes, data centres, or energy from waste facilities. A
heat network, despite its name, can provide both heating and cooling. 
Heat networks, as defined in the Heat Networks Scotland Act 2021, include both district and
communal heating:
• A district heat network is a network which distributes thermal energy from one or more
sources to more than one building.
• A communal heating system is a system which distributes thermal energy from one or
more sources to one building comprising more than one unit (e.g. a block of flats). 
Heat networks, depending on their fuel source, can help reduce greenhouse gas emissions. The
design of heat networks enables new heat sources to be added in the future with minimal
disruption for the end-user. This means that heat networks are a low-regrets technology.
Heat networks will play an important role in balancing wider energy networks, as they can store
energy and absorb constrained renewable electricity generation (when there is too much energy
being generated for the electricity grid). 
Heat networks may also help to reduce householders’ energy bills and tackle fuel poverty, if well-
designed and operating efficiently using an appropriate heat source. 
To be efficient, economically viable and deliver value for money, heat networks must be well
located. This means being in areas with sufficient heat demand and density to enable optimal
performance. It also means securing connections to the network from buildings with large, reliable,
and long-term demand for heat. These are known as ‘anchor loads’ and are essential in allowing
heat networks to operate efficiently. 
The Heat Networks Act requires local authorities to identify and potentially designate Heat Network
Zones. Zoning provides market signals to attract private investment from heat network developers.
Analysis was undertaken to identify the areas where heat networks present a decarbonisation
pathway that could be of strategic importance for South Lanarkshire. The areas of greatest
potential were identified based on heat density and the identification of anchor loads (see Appendix
F for full methodology). For the first iteration of the LHEES, only non-domestic buildings that the
Council has full or partial control over were treated as potential anchor loads in the heat network
zoning exercise. This is because the Council has greater control over the operation of these
buildings and can guarantee their use as an anchor load.
A total of 11 indicative heat network zones have been identified based on the analysis outlined
above. There are three primary opportunities and eight secondary opportunities (Map 8). These
zones are detailed in the Delivery Plan which provides additional details about specific areas and
potential opportunities. Further analysis through feasibility studies will be required to understand
the viability of heat network development in each identified area. 
184

Page 185

51 
Map 8: Primary and secondary heat network opportunities in South Lanarkshire.
New build developments
New build developments provide an opportunity to develop zero direct emissions heating systems
or heat networks. There is a guarantee of demand from these developments, and infrastructure
works can be included as part of the development to reduce overalls costs of heat network
development. 
The Local Development Plan sets out the housing land available to facilitate all housing
developments across South Lanarkshire to accommodate the Housing Supply Targets set out in
the Local Housing Strategy 2022-27. In addition, the Council is committed to delivering 1,300
additional council homes by March 2027 with proposed sites for new homes set out in the Strategic
Housing Investment Plan. 
Heat network opportunities will be considered for all new housing developments, while also
recognising the significant capital costs associated, particularly for smaller sites.
185

Page 186

52 
6. Opportunities for South Lanarkshire
A significant portion of the social housing in South Lanarkshire is owned by the Council. This
provides an opportunity to make the necessary investments in the social housing sector. By doing
this, the Council will lead by example to encourage retrofit in other sectors of the housing market.
Developing heat networks and improving the energy efficiency of buildings through retrofit provides
a range of economic and development opportunities for communities, businesses, individuals, and
the Council in South Lanarkshire.
6.1. Economic opportunities
Supply chain development 
The LHEES Delivery Plan will outline the substantial pipeline of work required to achieve the net
zero targets of local authority areas. This visibility may help to improve the local availability of
‘green skills’ by encouraging the existing workforce to invest in upskilling and attracting young
people into the workforce. The implementation of heat networks will also create new roles within
the local area, both short-term and for long-term operation. 
Financial returns
Heat networks and electricity generation sites can provide an additional source of income for the
Council. Any additional income generated can help to fund future decarbonisation programmes,
helping to accelerate progress towards net zero targets. The Council has been working with
partners to investigate the possibility of using land in the Council's ownership to identify renewable
energy opportunities. 
Community wealth building
Community Wealth Building (CWB) is an alternative approach to traditional economic
development, which seeks to develop resilient, inclusive local economies, with more local
employment and a larger and more diverse business base. It aims to reorganise local economies
to be fairer and aims to reduce wealth flowing out of our communities, towns and cities by helping
local investments and assets to generate more and better jobs for local residents and businesses. 
The South Lanarkshire Community Wealth Building Strategy was launched in 2021 and covers the
five different pillars of our community wealth building approach. Of these, domestic and non-
domestic public sector assets play a key role within the ‘Land and Property’ pillar, with a range of
actions agreed to support the aims of the strategy. The pillar seeks to deepen the function and
ownership of local assets held by anchor institutions (including the Council) so that financial and
social gain is harnessed by residents.  
186

Page 187

53 
Regional collaboration
South Lanarkshire’s existing regional engagement as a part of the Glasgow City Region provides
opportunities for further collaboration and knowledge exchange in relation to energy efficiency and
heat decarbonisation. Glasgow City Region is developing a Housing Energy Retrofit programme15.
Supply chains are generally more developed across the Central Belt compared to the rest of
Scotland, and there may be potential for developing these further through collaboration across
neighbouring councils.
Through the Local Housing Strategy, the Council will contribute to wider Glasgow City Region
projects with the aim of pulling resources and identifying solutions on a regional level. This includes
the City Region Retrofit Study and opportunities to work with neighbouring local authorities to
identify particular housing needs. 
6.2. New business models to accelerate retrofit
Meeting the targets to improve the energy efficiency of homes and buildings will require rapid
action across sectors. While some of the development and investment will come from the public
sector, the scale and cost of retrofit means that new business models need to be developed. These
models will provide opportunities for businesses, individuals, communities and the Council. South
Lanarkshire Council will be proactive in further exploring the opportunities and potential risks of
new business models and in partnering with others to maximise their potential.
This section outlines four business models that have the potential to accelerate retrofit in South
Lanarkshire. They are likely to require a central or anchor organisation, the Council is well-placed
for facilitation, implementation and engaging with local stakeholders.   
Area-based approaches
Area-based, or ‘neighbourhood’ approaches to delivery of retrofit programmes can help motivate
people to decarbonise their homes and provide support throughout a project. A central delivery
vehicle is set up to support local authority implementation of area-based decarbonisation
programmes. This vehicle finances the project and is responsible for recruiting investors to
supplement public financing made available through the local authority. This is a holistic approach
to decarbonisation of an area which includes the implementation of community co-benefits (e.g.,
improved transport links, more green spaces).
Collective purchase
This approach combines support, guidance and group purchasing of energy renovation services to
reduce upfront costs and accelerate retrofit at scale. Costs can be reduced by grouping together a
number of properties looking to undertake the same renovation works. A central delivery agent is
responsible for householder engagement and support, procurement and can also fulfil a project 
15 Glasgow City Region – Housing Energy Retrofit
187

Page 188

54 
management function. This delivery agent may also provide up-front financial support, such as a
loan, which is then repaid over time by the property owner. 
Split ownership of communal heat networks
The split ownership approach has been developed to support the rollout of networked heat pumps.
This approach helps to separate the homeowner from the upfront cost of infrastructure installation
(e.g., underground pipework). A private company or a not-for-profit community group finances and
installs the heating infrastructure, and local residents pay a fee to connect to the network as well as
a monthly charge for the energy they use in the home. Individual homeowners would still pay for
the systems in the home, in the same way as those who are connected to the mains gas grid
purchase and maintain their own boiler. 
Integrated Energy Systems (IESs)
Integrated energy systems (IESs) combine energy sources to collectively supply electricity,
transport, heating, and cooling demands of an area. The idea is that by looking across all areas of
demand, and thinking about the local service needs that determine energy use, a more effective
and efficient system can be created to help reduce waste and lower carbon emissions. There is
one central control platform to automate decision making and operate the grid accordingly.
7. Challenges
7.1. Heat networks
Expanding existing heat networks
Expansion of existing heat networks will require co-operation between the heat network operator
and any prospective customers. Many of the existing heat networks are not currently sized for
expansion. The challenges associated with network expansion include redesigning energy centres,
laying new connecting pipework and developing new contractual arrangements.
Modifications to individual property infrastructure will be required, primarily installing new heat
interface units (HIU) for each property. Internal pipework will need to be rerouted to the new HIU.
An assessment of any change in supply temperature from the network should be carried out, this
may require changes to radiator sizes within properties.
Minimum performance guarantees
Current contractual agreements generally do not include key performance indicators such as
overall system efficiencies. This is a challenge as there is little incentive for heat network operators
to maintain high system efficiencies if they have a minimum price guarantee. Introducing minimum
188

Page 189

55 
levels of service is important when entering into a contractual agreement with heat network
operators.
High capital costs 
Heat networks require a significant amount of upfront investment for the development of both the
heat generator (e.g. heat from waste facility) and the underground network of pipework. As such,
most existing networks in Scotland have been developed in partnership with local authorities, as
they have needed some form of public funding to get them up and running. 
Heat network demand assurance 
Heat networks are only viable where there is enough heat demand available to ensure efficient and
economical stability of the project.  Assurances need to be made prior to development that there is
enough heat demand in the area to ensure financial returns on investment. Whilst local people may
agree in principle to connect to the network, they cannot legally commit to a connection. This
uncertainty surrounding heat demand impacts on the willingness for investors to also commit to the
project, where initial investment is high, and returns are uncertain.  
Consumer uncertainty
Heat networks are uncommon in Scotland and therefore are an unfamiliar concept for most energy
consumers. There may be a reluctance to engage with a planned heat network project, and
householders may require incentives to encourage a connection and a significant amount of
support throughout the process. Consumers would also be limited to one heating supplier, and
therefore be subject to any fluctuations in energy prices without the option to shop around for a
cheaper alternative. 
7.2. Barriers to retrofit
Unit cost of electricity 
Those with fossil fuel boilers who are not in a heat network catchment would have to consider
switching to a heat pump or other electric heating system to decarbonise their home. Consumers
moving from mains gas (currently the cheapest form of heating) to heat pumps may see an
increase in energy costs. The unit price of electricity is currently a barrier to the installation of heat
pumps. This may be addressed by changes under the UK Government’s Review of Electricity
Market Arrangements (REMA). 
Grid capacity
Transitioning to ZDEH systems will significantly increase reliance on electricity, putting additional
pressure on the electricity grid. The grid will need to be reinforced to enable large scale heat
189

Page 190

56 
decarbonisation. This will be managed through engagement with the distribution network operator,
SPEN. Working with SPEN will ensure that work to deliver the LHEES will be aligned with grid
investment planning.  
High upfront capital costs
High upfront costs and long-payback periods are associated with some more expensive measures
such as EWI. This is a particular barrier for privately owned homes (owner-occupiers and private
renters) without the funds to invest upfront in energy efficiency improvements to their homes.
Funding does exist for these tenures, as detailed in the Delivery Plan. At present, this has not been
enough to mobilise private homeowners at the pace required to meet targets. 
Skills gap
There are major shortfalls facing the retrofit and decarbonisation industry in many specific trades
and professions such as plumbers, HVAC (Heating, Ventilation, and Air Conditioning) specialists,
surveyors and Retrofit Coordinators16. Investment is needed to encourage existing contractors to
upskill and train young workers to enter the retrofit and decarbonisation workforce. This is a
particular challenge in rural areas where training and upskilling opportunities are limited and where
there is lower demand for green skills. 
The Just Transition Commission has stated that the market will not drive the change required, and
systemic change must be driven by legislation and regulation from Scottish Government17.
Similarly, reforming public procurement mechanisms can create demand and support growth of
local workforces. The Scottish Government has committed to a £100m Green Jobs Fund over the
next five years, which will be used to support the development of sustainable and low-carbon
products and services.
Supply chain
Beyond the skills gap, the supply chains that underpin heat decarbonisation will also need to be
developed to meet future demand. A 2020 research report found that heat pump manufacturers
were confident in their ability to scale up operations as demand increases18. Concerns about
meeting future demand was primarily associated with upskilling and training of installers. 
Local housing stock 
Significant fabric upgrades would be required in 4.6% of off-gas properties and 15.5% of on-gas
properties in South Lanarkshire in order to be heat pump ready. Several factors can result in a
property being classified in this category. Some of these factors include the property being listed or
in a conservation area, being difficult to insulate, and a lack of an existing wet central heating
system. 
16 ClimateXChange (2022) Clean Heat and Energy Efficiency Workforce Assessment 
17 Just Transition Commission (2023) Scotland’s Retrofit Workforce: A Briefing on the Built Environment and
Construction
18 Eunomia (2020) Heat pump manufacturing supply chain research project  
190

Page 191

57 
Public confidence 
Recent research19 shows that there is broad concern about climate change among the public in
Scotland, however this does not seem to be translating into widespread uptake of decarbonised
heating systems. Whilst there are high levels of awareness of decarbonised heating, awareness
does necessarily indicate confidence. Advice from trusted sources, such as installers and Scottish
Government-backed advice services, as well as new energy-service business models will help to
build consumer confidence in these systems.
Disruption
The large-scale electrification of heat will require significant reinforcement of the transmission
network and changes to the operation of distribution networks in Scotland. It is expected that the
majority of network reinforcements will occur in semi-rural networks, where disruption will be low.
However, much of the urban network could also need upgrading, which will be disruptive as most
lines are underground.20
Householders can face significant disruptions when retrofitting their homes with zero direct
emissions heating systems. This has been highlighted in research on early adopters of heat
pumps21. The level of disruption varies across heating systems and will depend on the existing
heating system and pipework. 
Possible solutions
The Council will look to overcome the barriers to retrofit. Possible solutions will include retraining
our own in-house contracting operatives to install retrofit measures. This has already been
successful in the installation of ASHPs and PV panels by council operatives but can be expanded
further during the period of the first iteration of LHEES. The Council will work with the recently
formed the Lanarkshire Climate Action Hub to support homeowners to make energy efficiency
improvement to their homes. We will support local businesses to take advantages of the
opportunities which LHEES presents.
7.3. Challenges associated with different tenure types 
Owner occupied properties 
In South Lanarkshire, 72% of properties are owner-occupied. Of these, 62% are in EPC bands A-
C, meeting the proposed 2033 requirements22 for energy efficiency. The remaining 38% will require
improvements to the buildings fabric and/or heating system within the next 10 years.23 In the longer 
19 ClimateXChange (2020) Public awareness of and attitudes to low-carbon heating technologies
20 Vivid Economics, for CCC (2019) Accelerated electrification and the GB electricity system
21 Climate Xchange (2023) Experiences of early adopters of zero emissions heating 
22 Delivering net zero for Scotland's buildings - Heat in Buildings Bill: consultation
23 This depends on how the targets will be measured. At the moment, some properties will be able to meet
the EPC requirement by switching from electric storage heaters to a gas boiler. Future measurements (as
described in Scottish EPC reform consultation) may set more ambitious targets specific to the fabric
efficiency.
191

Page 192

58 
term, the 77% of owner-occupied properties that are currently using fossil fuel-based heating
systems will need to change by 2045. 
Since both deadlines are many years in the future, owner-occupiers may not be motivated to take
action sooner. This is likely to be compounded by uncertainty around local energy developments.
For example, owner-occupiers may be hesitant to install a new heating system if they await
information about the development of a heat network. This LHEES is part of the actions the
Council is taking to develop clearer plans around how the entire building stock will need to change.
Private rented sector 
The number of privately rented properties in South Lanarkshire has been steadily increasing over
the past decade, currently accounting for 9% of the building stock. Over half (58%), of these are in
EPC bands D or below. Under proposed legislation, privately rented properties will be required to
meet a minimum energy efficiency standard of EPC band C by 2028 (replacing the existing
requirement of EPC band E by 2025). Funding exists to support landlords to improve the energy
efficiency of their properties, however limited funding is available for heating system upgrades.  
The ‘split incentive’ associated with privately rented properties is a barrier to improving the energy
efficiency of these buildings. This describes the issue faced by a private landlord who is
responsible for paying for the cost of energy efficiency upgrades to their property but does not gain
from the financial benefits associated with cheaper energy bills. 
Social housing
In South Lanarkshire, 21% of properties are social housing, with the majority of these being owned
by the Council. Households in this category are at a higher risk of facing fuel poverty. Almost half of
Council-owned housing stock falls within SIMD deciles one and two, indicating a high risk of fuel
poverty.
As outlined in section 3, a new energy efficiency standard is being developed for social housing.
This will require South Lanarkshire’s social housing properties to undergo significant energy
efficiency improvements. Delivering the improvements will require assurance of long-term and
adequate funding available to support social landlords, to avoid rent increases which could worsen
fuel poverty. 
Mixed tenure
In South Lanarkshire, 6% of properties are in mixed tenure buildings. While this is a relatively small
proportion, they present a challenge when it comes to retrofit and heat decarbonisation. 
Mixed-tenure buildings are often slow to renovate because for some measures all occupants in the
building must agree to the installation and pay towards funding the project. If one occupant does
not have the funding available or does not agree to proceed with the project, this creates a risk that
the project will not go ahead. Mixed-tenure buildings have been highlighted as a particular
challenge in South Lanarkshire Council’s Local Housing Strategy.
192

Page 193

59 
Mixed-tenure buildings that are factored privately face challenges in coordinating retrofit projects,
for example the lack of building management structures such as owners’ associations (see 5.1.2
for more detail). 
193

Page 194

60 
Non-domestic properties 
Data is limited on non-domestic buildings, as many existing datasets are incomplete. Energy
efficiency upgrade information is not currently well-reported in the non-domestic sector. This is an
issue across Scotland, and not just in South Lanarkshire.24 
7.4. Rural and urban challenges
Rural areas 
In South Lanarkshire, 10% of people live in areas that are classified as ‘rural’25. They are more like
to experience a number of specific barriers to decarbonisation, including supply chain issues, lack
of local installers for renovation services, generally lower incomes and higher costs for retrofit due
to the ‘rural premium’26, and a greater proportion of older and traditional properties.
Additionally, people living in rural areas risk facing particular rural dimensions of fuel poverty, as
identified by the Scottish Rural Fuel Poverty Task Force in 201627. A key priority for South
Lanarkshire's advice and support services and housing investment programmes will be to continue
to identify and target rural households who are likely to face higher risks of fuel poverty, including
those in off-gas grid homes and solid wall, non-traditional construction types. Through the launch
of targeted Energy Company Obligation (ECO) funding, as well as external funding opportunities
such as community endowment funds generated by windfarm construction, the council will seek to
improve outcomes for rural households.
Urban area
In South Lanarkshire, 90% of people live in areas classified as ‘urban’ or ‘small town’28. Like rural
areas, urban areas also are also faced with unique barriers to decarbonisation. 
These include a greater number of mixed-tenure properties, such as tenement blocks, which can
be difficult to retrofit due to the size and scale of the work required as well as issues related to
occupant buy-in (see section 5.1.2 and section 3). 
Additionally, mains gas is the predominant heating fuel, where a switch to some zero direct
emissions heating systems, such as heat pumps, in some cases could be more costly to run for
householders. This is a significant barrier to householder engagement with the decarbonisation
agenda, as discussed in section 7.2. 
24 An evidence review of data associated with non-domestic buildings 
25 Defined as Remote Small Towns, Accessible Rural, and Remote Rural in the Scottish Government 6-fold
Urban Rural Classifications
26 Higher cost of goods and services in rural areas
27 Delivering affordable warmth in rural Scotland: action plan 
28 Defined as Large Urban, Other Urban, and Accessible Small Towns in the Scottish Government 6-fold
Urban Rural Classifications
194

Page 195

61 
8. Summary
South Lanarkshire’s LHEES sets out how to tackle greenhouse gas emissions from buildings,
whilst also improving residents’ quality of life by addressing fuel poverty. This Strategy informs, and
should be read alongside, the LHEES Delivery Plan. 
South Lanarkshire’s LHEES will support the delivery of the Council’s goals of improving energy
efficiency, reducing fuel poverty, and decreasing carbon emissions through zero direct emissions
heating systems. In addition, it will support the Council and its community planning partners to
scale up and align existing programmes, and to increase the scale and pace of retrofit and heat
network development that is needed to meet the national target of net zero by 2045.  
Overall, the content of South Lanarkshire’s LHEES has been informed primarily through a data-
driven approach using a number of datasets and proxy indicators. The Strategy outlines a number
of challenges which need to be overcome in order to decarbonise South Lanarkshire’s buildings. It
also highlights opportunities, including 11 potential heat network zones. 
There is a statutory duty on the Council to update the LHEES every five years. Due to the urgency
of the climate emergency, and the rapidly evolving policy landscape, the Strategy and Delivery
Plan will both be reviewed and updated on an annual basis. This means they should be treated as
live documents which will to respond to the introduction of new standards, regulation, and delivery
programmes, to any changes in the LHEES process, and to future opportunities within South
Lanarkshire. 
195

Page 196

62 
9. Glossary
9.1. Abbreviations
Acronym Description
EES Energy Efficient Scotland
EESSH Energy Efficiency Standard for Social Housing
EPC Energy Performance Certificate
EST Energy Saving Trust
EWI External Wall Insulation
GIS Geographic Information System
ABS Energy Efficiency Scotland: Area Based Schemes
IZ Intermediate Zone
LA Local Authority
LHEES Local Heat and Energy Efficiency Strategy
LPG Liquefied Petroleum Gas
mxd Map Exchange Document
PEAT Portfolio Energy Analysis Tool
SAP Standard Assessment Procedure
ToC Table of Contents
196

Page 197

63 
UPRN Unique Property Reference Number
9.2. Terms
Terms Description
Baselining Baselining is the purpose of understanding at local authority or
strategic level, the current status of the buildings against the
Priorities, Targets and Indicators set out in the Baseline tool.
Building-level
Pathway
As part of LHEES Stage 5, a building-level pathway is the
outcome of the assessment undertaken using PEAT. It provides
the likely energy efficiency retrofit technologies, as well as the low
carbon heating system (where applicable) to support building
level decarbonisation. 
Criteria Criteria are the settings applied to the Indicators for each Priority
in order to support Baselining, Strategic Zoning and the
identification of Delivery Areas. An example of Criteria is a simple
“no” applied to the indicator of “wall insulation (Y/N)” to identify
properties with uninsulated walls. Another example is the
definition of an “anchor load” within the Heat Networks analysis,
which applies a minimum threshold to the “heat demand”
Indicator. The LHEES methodology provides a set of default
Criteria that local authorities may wish to use, with flexibility to
update and augment these to support local needs or for more
focused analysis linked to specific actions and project
identification within the Delivery Plan.
Data - Alternative Alternative data can overwrite the Core data to improve accuracy
(national to local level of detail, e.g. local housing data to
overwrite fields in Home Analytics). 
Data - Core Core data is the data that is essential to complete the minimum
requirements of the LHEES analysis. Core data will come from
national datasets e.g. Home Analytics or the Scotland Heat Map.
Data -
Supplementary
Supplementary data allows inclusion of additional Indicators to
inform specific, local priorities & targets; also, Supplementary
data can be used in GIS investigation to complement the Core
analysis carried out in any assessment. An example of
197

Page 198

64 
Supplementary data would be the inclusion of low carbon heat
supply information layers within a district heating analysis. 
Data Zone Data zones are groups output areas which have populations of
around 500 to 1,000 residents.
Delivery Area Delivery Areas (sometimes referred to as Delivery Level Areas)
are a term used for all LHEES Priorities with the exception of
Heat Networks. These Areas will be an important starting point for
identifying a range of projects, regulation and actions that are
within the competence of the Scottish Government and local
authorities (projects and actions to be developed in the LHEES
Delivery Plan). Delivery Areas are at a higher granularity than
Strategic Zones, are generated as part of LHEES Stage 4 and
are presented in the LHEES Delivery Plan. Guidance is provided
for one approach to identify Delivery Areas, but there are other
approaches that local authorities may wish to use. 
The identification of Delivery Level Areas through LHEES will be
indicative only, with further investigation being required to
determine the viability of progressing projects associated with the
area identification activity.
Detailed practitioner
guidance Steps
These Steps form part of the detailed practitioner guidance in
LHEES Stage 4, Generation of Initial Areas to set out particularly
suitable heat network zones and to support project identification.  
Energy Efficiency
Measures
Measures such as double glazing, draught proofing and
insulation which reduce energy demand and increase the viability
for switching to low carbon heat sources.
Heat
Decarbonisation
Decarbonisation of heat refers to reducing carbon emissions from
heating systems. This involves switching to low carbon heating
systems to provide homes with ‘clean’ heat.
Heat Pumps A heat pump is a device that transfers heat from the outside
environment into a building by transferring thermal energy using a
refrigeration cycle, cooling the cool space, and warming the warm
space.
Indicator For a given Priority, the purpose of an Indicator is 1) To act as a
key information field to help characterise the local authority using
198

Page 199

65 
the Baseline tool as part of LHEES Stage 3 (authority-wide and at
a strategic level); 2) To act as a key information field to support
strategic zoning and generation of initial delivery areas (as part of
LHEES Stage 3 and 4); 3) if suitable, to act as a key information
field to measure progress against Targets over the duration of the
LHEES - set out in LHEES Stage 8, LHEES Delivery Plan. For
some Priorities, one Indicator may be sufficient, but for others a
range may be appropriate. The LHEES methodology sets out a
core set of default Indicators that local authorities may wish to
use, with flexibility to update and augment these to support local
needs or for more focused analysis linked to specific actions and
project identification within the Delivery Plan. 
Intermediate Zone Intermediate zones are a statistical geography that are designed
to meet constraints on population thresholds (2,500 - 6,000
household residents), to nest within local authorities, and to be
built up from aggregates of data zones.
LHEES Delivery
Plan
An LHEES Delivery Plan is an action plan that enables a local
authority and its partners to work towards delivery of the changes
identified in the LHEES Strategy. Actions will contribute to
achieving Scotland’s statutory targets on net zero greenhouse
gas emissions and fuel poverty, as well as enabling the delivery
of changes to buildings and local infrastructure needed to fulfil the
Scottish Government’s objectives relating to heat and energy
efficiency in buildings. The Delivery Plan will clarify stakeholder
roles and responsibilities in delivering the Strategies; build on
existing plans and policies, such as EEPS:ABS Plans, as far as
possible and; coordinate across local partners and provide a
mechanism for identifying new delivery actions.
LHEES Priorities The LHEES Priorities are a list of technologies, building
typologies and policy priorities that the LHEES Methodology uses
to identify and target interventions. 
They include: 
- Heat networks 
- Off-gas grid buildings
- On-gas grid buildings 
Secondary outcomes include: 
- Poor building energy efficiency 
- Poor building energy efficiency as a driver for fuel poverty 
- Mixed-tenure, mixed-use properties and historic buildings
199

Page 200

66 
LHEES Stages There are 8 LHEES Stages. The purpose of the LHEES
Methodology is to enable the local authority to complete LHEES
Stages 1 to 6. The completion of these Stages will provide the
local authority with the data analysis and evidence base to enable
them to complete their LHEES Strategy and Delivery Plan
documentation. There are two LHEES guidance templates
included alongside this methodology– LHEES Strategy guidance
and LHEES Delivery Plan guidance. The completion of these two
templates will satisfy the completion of LHEES Stages 7 and 8.
The 8 LHEES Stages are: 
1 - Policy and strategy review 
2 - Data and tools library 
3 - Strategic zoning and pathways 
4 - Generation of initial delivery areas 
5 - Building-level pathway assessment 
6 - Finalisation of delivery areas 
7 - LHEES Strategy 
8 - LHEES Delivery Plan
LHEES Strategy An LHEES Strategy identifies what needs to be done to change
buildings and relevant local infrastructure by 2045 to fulfil the
Scottish Government’s objectives and local priorities relating to
heat and energy efficiency in buildings. These interventions might
occur at building level or in energy supply networks or in a
combination of both. The Strategy will reflect national and local
priorities, policies and wider strategies. Where feasible, it will take
into account local and national factors, such as the timing of
planned infrastructure upgrades, access to resources and
funding, major projects, decisions over the gas grid and
community engagement.
Mixed-tenure,
mixed-use and
historic buildings
Mixed-tenure and mixed-use buildings could include a mixture of
owner occupied, private rented and social housing, and also non-
domestic uses, or simply multiple ownership within the same
tenure. Historic buildings include the buildings that are within
conservation areas or those that are listed buildings. These
categories may require established alternative approaches and
regulation for the installation of low carbon heat and energy
efficiency solutions and where specific advice and support might
be available relating to the installation of these solutions.
200

Page 201

67 
Potential Zones The Heat Networks Priority follows a distinct methodology to the
other LHEES Priorities – Stage 3 does not apply and the outputs
from Stage 4 are of a different type, showing Potential Zones for
Heat Networks as opposed to the identification of Delivery Areas
(notionally using a 100m raster approach). The Heat Networks
Priority analysis and activity carried out within LHEES is also
anticipated to support activity related to formal zone designation
as required by the Heat Networks Act. For these reasons, the
analysis carried out in Stage 4 for Heat Networks is to identify
Potential Zones rather than the otherwise used naming
convention of Delivery Areas. The Potential Zones identified are
to be included in the LHEES Strategy and could also inform
actions around further investigation / progression within the
LHEES Delivery Plan.
Raster A matrix of squares, or grid, used as a method of data analysis in
GIS. Each cell in the grid contains a value representing
information on the cell’s contents.
Strategic Level Zone Strategic Zones (sometimes referred to as Strategic Level Zones)
are a term used for all LHEES Priorities with the exception of
Heat Networks. Strategic Level Zones are identified in Stage 3
and are presented in the LHEES Strategy. These zones offer a
visualisation of the potential pathways to decarbonise the building
stock at a local authority level, split out by intermediate zone
level. They are useful to understand the baseline performance,
the scale of potential and initial areas of focus. Strategic Zones
could be used to inform or prioritise focus areas for the more
granular identification of Delivery Level Areas. 
The identification of Strategic Zones through LHEES will be
indicative only.
Targets Targets are the measurable aspect of the Priority and are likely to
be taken directly from national and/or local policy documentation,
for example net-zero by 2045, or EPC C by 2040. Targets are
likely to comprise of end-point targets and milestone targets and
would sit along a timeline within (and beyond) the LHEES. This
timeline would help to prioritise the types of projects undertaken
within the LHEES over its duration.
Weighting For some Priorities, one Target and Indicator may be sufficient,
but for others a range of Indicators may be appropriate to
contextualise and characterise performance against a Target
201

Page 202

68 
and/or progress towards a Priority. If multiple Indicators are used
in strategic zoning or the identification of delivery areas, a
Weighting can be applied based on the importance of each. The
LHEES methodology sets out a core set of default Weightings for
instances where multiple Indicators are suggested as a default
setting. There is flexibility to update and augment these to
support local needs or for more focused analysis linked to
specific actions and project identification within the Delivery Plan. 
202

Page 203

69 
10. Appendices
10.1. Appendix A: Additional national policy drivers
Policy/strategy Description Targets/aims
Heat in Buildings
Supply Chain
Delivery Plan
This plan sets out how the supply
chain needs to grow and develop to
meet the future of heating and energy
efficiency regulations.
Accelerate efforts to build on energy
efficiency and reduce our demand
for energy. Rapidly scale up
deployment of zero emissions
heating systems, such as heat
pumps and heat networks.
Tackling fuel poverty
in Scotland: a
strategic approach 
Sets out the policies and proposals
for national government, local
authorities, and third sector partners
to help meet the targets set Fuel
Poverty (Targets, Definition and
Strategy) (Scotland) Act 2019. 
Heat Networks
Delivery Plan
Sets out how provisions of the Heat
Networks (Scotland) Act 2021 will
contribute to increasing heat networks
in Scotland.
The plan to facilitate reaching the
targets set out in the Heat Networks
(Scotland) Act 2021.
Draft Energy Strategy
and Just Transition
Plan 
The draft sets out key ambitions for
Scotland’s energy future.
Targets include: the production of
more than 20 GW of additional
renewable electricity on- and
offshore by 2030, accelerate the
decarbonisation of domestic
industry, transport and heat and to
increase contributions from solar,
hydro, and marine energy.
New Build Heat
Standard 2024
(NBHS) 
This legislation changes building
regulations to promote the uptake of
zero direct emissions heating
systems, such as heat pumps and
heat networks.
New buildings applying for a
building warrant from 1 April 2024
will be prohibited from using direct
emissions heating to help reach the
targets set in The Climate Change
(Emissions Reduction Targets)
(Scotland) Act 2019.
Review of Electricity
Market Arrangements
(REMA)
Proposed reforms to the electricity
market to improve security of supply
and cut prices for consumers. 
203

Page 204

70 
(UK Government)
Tenements (Scotland)
Act 2004  
The Tenement Management Scheme
(outlined in Schedule 1 of the Act)
explains how to come to
arrangements about maintenance
and how costs are shared between
owners. 
The Planning (Listed
Building Consent and
Conservation Area
Consent Procedure)
(Scotland)
Regulations 2015
This legislation provides the
framework for applying for listed
building consent and conservation
area consent on or after 1st October
2015. 
Public Sector
Leadership on the
Global Climate
Emergency:
Guidance (2021)
This guidance provides advice for
public bodies on: leadership; robust,
consistent and comprehensive carbon
management; interpretations of the
strengthened legislation; and
resources available to support public
bodies.
Provides advice to public bodies to
assist with achieving the targets set
in the climate change plan 2018–
2032 update.
NHS Scotland climate
emergency and
sustainability
strategy: 2022-2026
Sets out plans for NHS Scotland to
reduce its greenhouse gas emissions
and impact on the environment, adapt
to climate change and to better
contribute to the United Nation’s
sustainable development goals. 
NHS Scotland is aiming to become
a net-zero health service by 2040 at
the latest. 
Police Scotland -
Environmental
Strategy 2021
The Environmental Strategy sets out
Police Scotland’s commitment to
environmental sustainability and
represents an organisational
response to the climate crisis.
Reduce carbon emissions by 35%
over the next 5 years. Includes
ambitions to improve energy
efficiency of buildings. 
Historic Environment
Policy for Scotland  
HEPS is a non-statutory policy
statement that should be taken into
account whenever a decision will
affect the historic environment.  
Promote a way of understanding the
value of the historic environment
while encouraging consistent,
integrated management and
decision-making to support a
positive outcome for Scotland’s
historic assets.
204

Page 205

71 
10.2. Appendix B: Datasets used in the development of
this LHEES 
Data Resource/Tool Description Data Format Weblink
Scotland Heat Map
(SHM) (Summer 2020)
Valuable spatial dataset with point-level
heat demand data for all properties in
Scotland / various other useful data fields
and additional information layers.
Updated approximately annually. Source
data (including from public sector)
requested at each update.
Spatial
geodatabase
https://www.
gov.scot/pub
lications/scot
land-heat-
map-
documents/
Home Analytics v3.7
(Feb 2021)
Database covering all domestic
properties in Scotland, built using
information from the domestic EPC
register and other sources; statistical
models are used to provide estimates
giving 100% property coverage  
Excel
spreadsheet
https://energ
ysavingtrust.
org.uk/servic
e/home-
analytics/
Non-Domestic Analytics
(version 1.1)
Database covering all non-domestic
properties in Scotland, built using
information from the non-domestic EPC
register and various other sources, with
extensive modelling to provide estimates
giving 100% property coverage  
Excel
spreadsheet  
Portfolio Energy
Analysis Tool
(PEAT)[VS1]  
Tool to accompany Home Analytics; can
be used to investigate and cost
intervention options for a portfolio of up to
500 properties; can be driven by a price
cap or a target EPC score  
Tool hosted
online; input /
output as
Excel
spreadsheet
https://home
analyticspea
t.est.org.uk/
One Scotland Gazetteer
(OSG) - Address
Gazetteer (AG)
Central database for all addresses within
an authority
GIS API or
csv file 
Local Development Plan
sites
Information, ideally in spatial format, on
development sites in the LDP and LDP2.
To include detail on development type
and expected build-out where available.
GIS
shapefiles 
SEPA waste heat data
Online
interactive  
205

Page 206

72 
Waste sites capacity tool
(SEPA)
map viewer/
Excel
spreadsheet
https://www.
sepa.org.uk/
data-
visualisation/
waste-sites-
and-
capacity-
tool/
Green Heat in
Greenspaces (GHiGs)
GHiGs investigated the suitability of many
types of urban open space across
Scotland for use as low carbon heat
sources, heat storage sites and heat
transmission corridors.
Excel
spreadsheet
https://www.
greenspaces
cotland.org.
uk/introducin
g-
ghigs#:~:text
=Green%20
Heat%20in
%20Greens
paces%20(
GHiGs)%20i
s%20a%20p
roject%20wit
hin%20the,S
cottish%20lo
w%20carbo
n%20heat%
20transition
Geographic boundary
datasets
Information, ideally in spatial format, on
council-owned assets.
GIS
shapefiles  
https://borde
rs.ukdataser
vice.ac.uk/b
ds.html 
10.3. Appendix C: Datasets and Limitations of the LHEES
approach
Home Analytics
Home Analytics Scotland provides essential data on the Scottish housing stock. This data is
provided down to the address level and is available to the Scottish Government and local
authorities to assist them in developing, targeting and delivering policies, schemes and
programmes designed to improve energy efficiency, install renewable technologies and alleviate
fuel poverty. The core datasets that make up Home Analytics Scotland are: 
206

Page 207

73 
• Energy Performance Certificate data 
• Home Energy Efficiency Database (HEED) data 
• Energy Saving Trust Home Energy Check (HEC) data 
• Ordnance Survey AddressBase, MasterMap Topography layer and StreetMap data 
• Scotland Gas Networks data 
• Scottish Census data 
• Scottish Index of Multiple Deprivation (SIMD) data 
While there is full coverage of the Council’s property stock, the data is not entirely accurate given
that not all properties are surveyed; where gaps exist property information will have been
estimated based on neighboring characteristics using statistical modelling. 
Fuel poverty figures in the dataset only act as an indication. To date, there has not been a
comprehensive dataset detailing fuel poverty given the resources required to do so and the risk of
identifying individuals and communities through the use of sensitive information such as income
data. The fuel poverty data is therefore probability driven and users should not treat figures as an
absolute number or percentage but rather a likelihood of fuel poverty. An instance where fuel
poverty data lacks confidence and leads to a poor representation of the geographical area is in
households in affluent areas who may be labelled as in fuel poverty because they live in stone
buildings with poor heating capture.
Currently, fuel poverty data is calculated by the following: 
• Probability of wall being uninsulated
• Loft Insulation Prediction
• Loft Insulation: 0-99mm
• Loft Insulation: 100-249mm
• Loft Insulation: >250mm
• No loft
• Excess Cold Category 1 Hazard
• Probability of Fuel Poverty (Fuel Bill >10% of Income)
Non-domestic Analytics
Non-domestic Analytics is a new data set developed by Energy Saving Trust on behalf of Scottish
Government, to provide more property-level details about the non-domestic building stock in
Scotland. The dataset brings together property details from a variety of data sources such as the
Scottish EPC Register, Ordnance Survey, Scottish Assessors and BEIS, to establish property
attributes and energy profiles for each non-domestic building. Like Home Analytics, gaps in these
records are imputed using a series of statistical models. The final database is therefore a
combination of known and modelled records.
There are limitations on the confidence of using Non-Domestic Analytics due to the lack of robust
information from the non-domestic sector compared to the domestic sector with much of the data
relying on significant modelling. Therefore, users should not take figures as an absolute number or
percentage but rather an estimation. Due to the reliance on probability, analysis was limited to
exploring groupings of building typologies.
207

Page 208

74 
The dataset relies on the use of an external categorisation of property typology (Ordnance Survey)
resulting in a deviation in standard interpretation of property classes. For example, church can be
classified as either a commercial or place of worship depending on its main function, while
residential (non-domestic) buildings can also indicate short-term lets and sheltered
accommodation. 
Scotland Heat Map (2020)
Containing both domestic and non-domestic heat demand data, the Scotland Heat Map is an
important resource to identify the opportunities for efficient heat supply projects and support their
development. Developed with data provided by public and private sector organisations including all
local authorities, it will help to identify opportunities for new and expanding heat projects including
efficient supply projects, such as district heating. The dataset also contains various additional
layers such as Geology and hydrogeology, waste energy supply points, and existing heat
networks. 
As the dataset was captured in the summer of 2020, demand data exists only as a snapshot in
time. Since network viability is based around the demand of individual buildings, the difference
between modelled and expected demand may affect that viability.  
PEAT-OR tool
The PEAT-OR tool, developed by EST, accompanies Home Analytics. It is used to investigate cost
intervention options for a portfolio of up to 500 properties. The tool has a relatively high degree of
flexibility to be tailored to reveal target areas and properties by price cap or a target EPC score.
However, there are the following limitations:
• Individual measures cannot be isolated or removed, the tool will show all possible
interventions. This means some impractical measures are proposed such as installing wind
turbines.
• Costs and Carbon savings are calculated for al possible measures, this means it is not
possible to investigate the impact of individual measures. 
• Fuel cost data used within PEAT-OR was released at the start of July 2023, with fuel costs
modifying frequently these costs are not totally accurate 
These limitations will affect the outputs from Stage 5, which should be understood as estimates
only. 
Ordnance Survey 
Various mapping data, central to the development and use of Scotland's Heat Map and other GIS
information sources. OS product data and licenses are required to use SHM & other OS-derived
datasets. Key to GIS analysis elements of LHEES. 
208

Page 209

75 
One Scotland Gazetteer 
Central database for all addresses within an authority. Key to GIS elements of LHEES for
identifying multi-tenure non-domestic properties. 
10.4. Appendix D: LHEES stage descriptions
Stage 1: Policy and strategy review
A policy review was carried out to highlight national, regional and local policies that are linked to,
impact, or could be impacted by LHEES. Results from this review, along with initial stakeholder
mapping were logged in the policy review template for reference during subsequent stages of the
LHEES.
Stage 2: Data and tools library
This stage involves identifying and maintaining a record of the data and tools used to support
analysis in the subsequent stages of the LHEES process. The record captures data sources,
ownership rights, requirements for the LHEES Considerations and data format.
Stage 3: Strategic zoning and pathways
The purpose of LHEES Stage 3 is to support local authorities to understand the current energy
efficiency and heat decarbonisation performance of the building stock at a local authority wide
level. It also supports further analysis to set out Strategic Zones and pathways for each LHEES
Consideration, as far as reasonably possible, at data zone level, a commonly used standard for
statistical reporting of socio-economic data.
These Strategic Zones identify potential solutions for inclusion in the LHEES Strategy (Stage 7).
The analysis sets out the strategic starting point for the generation and prioritisation of Delivery
Areas (Stage 4), as well as further engagement and actions for the Delivery Plan (Stage 8).
LHEES Stage 3 is supported by both the ‘Domestic Baseline Tool’ and the ‘Non-domestic Baseline
Tool’. The Domestic Baseline Tool was developed by Zero Waste Scotland for analysis of the
domestic sector drawing on Home Analytics as the core source data to support this. The tool was
used to generate a performance baseline of buildings and to set out Strategic Zones with respect
to the LHEES Considerations. The ‘Non-domestic Baseline Tool’ was developed following the
release of Non-Domestic Analytics, as a means to support better understanding of the breakdown
of non-domestic building typologies and by other criteria, such as age, heating system type or floor
area category. Given the limitations of the non-domestic dataset, the outputs are focused on
providing property count and / or total heat demand information for these groupings, rather than
suggesting suitability for specific interventions.
When assessing heat decarbonisation options in the tools, heat pump installation is one of the
suggestions. According to the LHEES methodology, the level of heat pump ‘readiness’ in domestic
properties are sorted into four categories:
209

Page 210

76 
Building category  Description
Category 0  Currently have a low or zero direct emissions heating system, or
heat network connection
Category 1  “Heat pump ready” buildings that are well-suited to heat retrofit
with minimal other changes.  
Category 2  Secondary potential for heat pump
retrofit. Require some fabric and/or distribution systems upgrades. 
Category 3  Significant upgrades required to be heat pump ready.
In the standard Zero Waste Scotland methodology, Category 1 properties are assessed based on a
range of indicators including wall insulation, glazing status, wet heating system and loft insulation
prediction. For South Lanarkshire’s LHEES, only wall insulation was accounted for in Stage 3 given
that this was the most relevant factor to the local domestic property stock. 
Stage 4: Generation of initial Delivery Areas.
Stage 4 is informed by the LHEES Strategy and analysis from Stages 1-3. The purpose of Stage 4
is to support the Council’s decision making by generating initial Delivery Areas for each of the
LHEES Considerations. This Stage uses GIS to generate initial Delivery Areas at a higher
granularity than LHEES Stage 3, to enable the Council to understand specific locations of potential
Delivery Areas within a Strategic Zone or across the whole local authority. The level of granularity
is advised at 250m2 to reflect an appropriately sized delivery area without the risk of identifying
individual properties. 
This analysis is the starting point for more detailed engagement, building level assessment of
interventions and cross-checking against the policy and strategy review (stage 1) to enable
finalisation of the Delivery Areas (LHEES Stage 6). These Delivery Areas should then support
actions in the Delivery Plan (Stage 8) that are within the competence of the Scottish Government,
local authorities and wider partners.
Stage 5: Building-level pathway assessment
The purpose of LHEES Stage 5 is to support with delivery area identification of Stages 4 and 6 to
establish in more detail the type of intervention(s) required to decarbonise the building from a
heating and energy efficiency perspective. This stage provides an understanding of the costs and
the energy and carbon savings associated with interventions.
Stage 5 enabled South Lanarkshire Council to select and analyse domestic buildings for
assessment in the Energy Saving Trust’s PEAT-OR, for the domestic sector only. PEAT-OR
enables the local authority to evaluate energy efficiency and heat decarbonisation retrofit options in
terms of costs and carbon emissions reduction. Results can be presented at the building level or at
a zone level. The buildings to be evaluated can be selected and taken from the analysis in LHEES
Stage 3 or Stage 4.
It is recognised that PEAT-OR has not been designed specifically to support LHEES. Therefore, in
this LHEES, a PowerBI report has been developed to enable the Council to explore potential
decarbonisation results in an interactive and customised manner to assess viability and decision
making of delivery areas. 
210

Page 211

77 
Stage 6: Finalisation of Delivery Areas
During this stage, Strategic Zones, initial Delivery Areas and any building-level assessment were
considered alongside the detail included as part of the policy and strategy review and all
stakeholder engagement undertaken. The outcomes from this stage are documented in the stage 8
Delivery Plan. 
10.5   Appendix E: Identification of conservation areas
and listed buildings 
Map 9: Count of buildings in conservation areas.
211

Page 212

78 
Map 10: Count of listed buildings.
10.6   Appendix F: Detailed methodology for the
identification of potential heat network zones
Analysis was undertaken to identify the areas where heat networks present a decarbonisation
pathway that could be of strategic importance for South Lanarkshire. Heat Data Point non-
domestic properties were filtered to only include semi-public and public buildings. These were
refined using OS AddressBase classification codes identified as semi-public or public by the Green
Heat in Greenspaces project. Additionally, a sense check of building names was carried out to
identify council-owned buildings. If that was the case, the buildings were added to analysis. This
approach was chosen so that only non-domestic buildings that the Council has full or partial control
over are treated as potential anchor loads in the heat network zoning. When defining anchor loads,
public and council-owned buildings have been prioritised as the Council has greater control over
the operation of these buildings. 
Heat network zones have been identified based on a 4,000 kWh/yr/m linear heat density (a means
of relating annual heat demand to a distance). Areas of greatest potential for heat network
development have been further identified based on a solely heat demand perspective where at
least two anchor loads were required > 500MWh/yr.
Further analysis through feasibility studies and constraints analysis were required to understand
the viability of heat network development in each identified area. Existing heat networks have been
added to potential heat network zones to identify viability of heat network expansion. For the
212

Page 213

79 
purpose of LHEES, a 500m radius buffer has been drawn around the existing heat network points
to provide a sensible estimate of the area within which heat demand can serve.
The methodology for identification of heat networks has been summarised in the figure below. For
a comprehensive methodology, please see the Heat Network Zoning methodology in the LHEES
documentation. 
Figure 19 Summary of the methodology for identifying heat network zones
213

Page 214

214

Page 215

Error! Reference source not found. 1
South Lanarkshire Council
Local Heat and Energy
Efficiency Delivery Plan
June 2024  
12
215

Page 216

Error! Reference source not found. 2
Executive Summary
The aim of LHEES is to provide a plan for decarbonising heat in buildings and improving their
energy efficiency to meet statutory national targets by 2045. The Delivery Plan sets out how the
Council will support implementation of the LHEES. It identifies areas to target for low-regrets
measures to decarbonise heat in buildings. This is the first LHEES Delivery Plan, and it is focussed
mainly on actions for the next five years.
The Council has identified three priorities for the first LHEES. 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition
and energy efficiency of housing across all tenures to ensure that poor energy performance
is removed as a driver of fuel poverty. The first LHEES Delivery Plan has a strong focus on
social housing and mixed-tenure properties, due to the high risk of fuel poverty. 
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change. The first LHEES Delivery Plan will initially target
heating system upgrades in buildings that are already highly suitable for heat pumps, across
all housing tenure types.  
2a: South Lanarkshire Council will lead by example by transitioning all council-
owned properties to zero direct emissions heating (ZDEH) systems, and no
longer installing gas boilers. 
2b: South Lanarkshire Council will actively support, encourage, and enable
owner-occupiers and private sector landlords to retrofit homes.   
Priority 3: Make greater use of heat networks as part of the wider just transition to net
zero. This Delivery Plan outlines 12 indicative heat network zones which may be suitable for
the development of heat networks. 
Delivery of the LHEES
The implementation of the LHEES will be driven by South Lanarkshire Council and requires a
collaborative cross-sectoral approach. A key priority for the delivery of South Lanarkshire’s LHEES
is engaging with relevant stakeholders. The Council will develop a stakeholder engagement plan to
enable collaboration and seek feedback on the LHEES Strategy and Delivery Plan.
Delivering Heat Networks
South Lanarkshire Council has categorised heat network opportunities into three priority areas for
immediate action, and nine further heat network opportunities. Two of the three priority indicative
heat network zones are in the Almada Street area of Hamilton, and the third is in East Kilbride.
These are all areas with high heat loads and an existing heat network nearby. A feasibility study
has been completed already for Almada Street, Hamilton (Priority Heat Network Zone 1). The
216

Page 217

Error! Reference source not found. 3
Council will invest in developing a suitable delivery model for Almada Street heat network with the
assistance of expert consultants. For the other indicative heat network zones, the Council will
review Local Development Plans to assess the viability of these opportunities, and commission
detailed feasibility studies.      
The further nine heat network opportunities will be considered after the three main clusters. These
require a review of any future planned developments to assess the feasibility of a network in the
zone. 
There are limitations to the data used as part of the LHEES process, particularly the availability of
data on non-domestic buildings. The Council has committed to undertake Building Assessment
Reports (BAR) for all its public buildings to ensure that decision-making and planning is based on
the best possible available data. BARs will be prioritised in three priority heat network zones.
Social housing and mixed-tenure properties
The Council owns 17% of the total housing stock and most of the social housing in South
Lanarkshire. This means that the Council can lead by example in installing heating and fabric
upgrades. Delivery areas for the next five years have been identified to target those areas with the
highest risk of fuel poverty. The delivery areas have been identified based on SIMD data. Almost
half of Council-owned housing stock falls within SIMD deciles one and two, indicating a high risk of
fuel poverty. These delivery areas will allow the Council to target its capital programme investment
plans in the areas where investment can have the greatest impact for alleviating fuel poverty. 
Mixed-tenure buildings have been identified in the LHEES as a priority for delivery. There are a
total number of 9,379 properties in mixed-tenure buildings in South Lanarkshire, approximately 6%
of the housing stock. For the first LHEES, mixed-tenure buildings where the Council is the factor
will be prioritised, as well as other blocks containing social housing. This is because social
landlords can facilitate the retrofit of multi-occupancy blocks. However, significant external funding
is needed to achieve the standards and targets required, which poses a challenge for the social
housing sector.
Private tenure housing
The Council’s approach is to support owner-occupiers and private landlords to meet regulatory
standards. South Lanarkshire Council proposes to use data outputs from LHEES to identify
suitable clusters of private tenure housing for retrofit. Key characteristics such as construction type,
heating systems, EPC and SIMD ratings will be used to develop a short list of clusters for further
engagement.  
217

Page 218

Error! Reference source not found. 4
Table of contents
Executive Summary 2
1. Introduction 5
1.1. Purpose of this report 5
1.2. Delivery Plan layout 5
2. South Lanarkshire’s LHEES 7
2.1. LHEES Priorities 7
2.2. Implementation and Governance 7
2.3. Engagement 8
3. Heat Network Delivery Areas 10
3.1. Heat Networks (Scotland) Act 2021 10
3.2. Priority Heat Network Zones 10
3.3. Further Heat Network Opportunities 15
3.4. Summary of Actions for Heat Networks 23
3.5. Funding Heat Networks 24
4. Social Housing and Mixed-Tenure Delivery Areas 25
4.1. Priority Delivery Areas 25
4.2. Summary of actions for social housing and mixed-tenure properties 28
4.3. Funding available for social housing and mixed tenure 29
5. Private Tenure Housing Delivery    Areas 30
5.1. Priority Delivery Areas 30
5.2. Summary of actions for private tenure housing 31
5.3. Funding available for private tenure housing 31
6. Non-Domestic Delivery Areas 34
6.1. Priority Delivery Areas 34
6.2. Summary of actions for non-domestic buildings 35
6.3. Funding available for non-domestic buildings 36
7. Summary 37 
218

Page 219

Error! Reference source not found. 5
1. Introduction
1.1. Purpose of this report
Local Heat and Energy Efficiency Strategies (LHEES) are at the heart of a place based, locally led,
and tailored approach to the heat transition. The aim of LHEES is to provide a long-term and
evidence-based plan for decarbonising heat in buildings and improving their energy efficiency
across an entire local authority area. LHEES are primarily driven by Scotland’s statutory targets for
greenhouse gas emissions reduction and fuel poverty:
• Net zero emissions by 2045 and 75% reduction by 2030
• In 2040, as far as reasonably possible, no household in Scotland is in fuel poverty. 
This LHEES Delivery Plan should be considered in conjunction with South Lanarkshire Council’s
LHEES Strategy. The Delivery Plan sets out how the Council will support implementation of the
LHEES. It identifies areas for targeted intervention through early, low-regrets measures to
decarbonise heat in buildings. This is the first LHEES Delivery Plan, and it focuses initially on
immediate and medium term (5-year) actions. 
At this early stage in the LHEES process, many of the actions detailed in this plan are
developmental or reflect projects and initiatives which are already underway. The analysis
undertaken to date as part of the LHEES process will be further expanded to develop a more
detailed and strategic delivery framework. This will form the basis of the next iteration of the
LHEES, which will be reviewed annually. 
1.2. Delivery Plan layout
The actions and delivery areas in this Delivery Plan are split into the following sectors:
• Heat network delivery areas: outlining the areas in South Lanarkshire with high heat
density which may be suitable for heat network development. 
• Social housing and mixed-tenure delivery areas: the Council owns 17% of the total
housing stock in South Lanarkshire. This means that the Council can lead by example in
installing heating and fabric upgrades. The priority actions for this Delivery Plan are to
tackle fuel poverty in areas with high levels of deprivation.  
Private tenure housing delivery areas: this covers both owner-occupied properties and those in
the private rental sector. Although there are some unique challenges, opportunities, and
regulations for these two tenure types, the Council’s approach is to support owner-occupiers and
private landlords to meet regulatory standards. 
219

Page 220

Error! Reference source not found. 6
For each chapter, the actions are summarised in a table format shown below. Actions have been
prioritised as one of:
• Immediate: to be implemented in the next two years. 
• Medium-term: to be implemented in the next 2-5 years.  
Action Priority Description Responsibility
Action required to
implement South
Lanarkshire’s LHEES
Immediate /
Medium-term
Additional detail of how the
Council and its partners
will achieve this. 
Lead responsible for
delivery
220

Page 221

Error! Reference source not found. 7
2. South Lanarkshire’s LHEES
2.1. LHEES Priorities
South Lanarkshire Council’s key priorities for this LHEES have been informed by the six LHEES
considerations (detailed in the LHEES Strategy), the local policy context, stakeholder engagement,
and analysis of the building stock in South Lanarkshire. The Council has identified three priorities
for the first LHEES. 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition and
energy efficiency of housing across all tenures to ensure that poor energy performance is removed
as a driver of fuel poverty. The first LHEES Delivery Plan has a strong focus on social housing and
mixed-tenure properties, due to the high risk of fuel poverty.
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change. The first LHEES Delivery Plan will initially target heating
system upgrades in buildings that are already highly suitable for heat pumps, across all housing
tenure types. 
The two priorities for transitioning to zero direct emissions heating (ZDEH) systems in South
Lanarkshire’s homes are: 
2a: South Lanarkshire Council will lead by example by transitioning all council-owned
properties to ZDEH, and no longer installing gas boilers. 
2b: South Lanarkshire Council will actively support, encourage, and enable owner-
occupiers and private sector landlords to retrofit homes.   
Priority 3: Make greater use of heat networks as part of the wider just transition to net zero. This
Delivery Plan outlines 12 indicative heat network zones which may be suitable for the development
of heat networks. 
2.2. Implementation and Governance
The implementation of the LHEES will be driven by South Lanarkshire Council. The LHEES
requires a collaborative cross-sectoral approach, engaging with partners and stakeholders is
essential to achieving the goals set out. It will be integrated into existing steering groups and
governance structure for sustainable development and climate change. 
Within the Council, LHEES ‘champions’ will support embedding LHEES delivery into everything
that we do. The Council has set up an officer working group to take forward the development of the
South Lanarkshire LHEES. The membership is made up of at least one representative from each
council resource or service who has responsibility for asset or estate management, energy usage
or supply. The group includes officers with expertise in economic development, GIS mapping,
energy efficiency, and building decarbonisation. 
221

Page 222

Error! Reference source not found. 8
LHEES Governance 
LHEES Governance diagram 
3.1 Actions: 
Action Priority Description Responsibility
Develop a monitoring
and evaluation
framework for the
LHEES delivery actions
Immediate For delivery actions, identify the
owner and the indicators to be
measured.  
Executive Director
of Housing &
Technical
Resources
Annual review of both
Strategy and Delivery
Plan
Immediate Update and amend both
documents considering regulatory
changes. Identify local targets.  
Executive Director
of Housing &
Technical
Resources 
. 
2.3. Engagement 
The LHEES Strategy and Delivery Plan have been developed in consultation with stakeholders
across South Lanarkshire, and through the public engagement strategy. Implementation will also
be a collaborative effort. 
A key priority for the delivery of the LHEES is for the Council to develop a stakeholder engagement
plan. This will draw on the stakeholder identification and mapping work which took place as part of
the LHEES development. Key stakeholder groups that the Council will work with include: 
222

Page 223

Error! Reference source not found. 9
• Local community groups
• Public sector partners 
• Housing providers 
• Delivery partners 
• Electricity and gas network operators 
• Local businesses
• Advice organisations 
Action Priority Description Responsibility 
Further develop and
implement stakeholder
engagement programme
to support
implementation of the
first LHEES Delivery
Plan
Immediate Based on the stakeholder
identification work undertaken as
part of the LHEES Strategy
development, the Council will
work with key stakeholders to
progress the actions detailed in
chapters 3 - 6.
Executive Director
of Housing &
Technical
Resources 
223

Page 224

Error! Reference source not found. 10
3. Heat Network Delivery Areas 
3.1. Heat Networks (Scotland) Act 2021
Section 47 of the Heat Networks (Scotland) Act 2021 places a duty on the local authority to review
heat network zoning in their area. The areas in South Lanarkshire have been reviewed and those
areas identified in sections 3.2 and 3.3 are considered as potentially suitable for the construction
and operation of a heat network.
3.2. Priority Heat Network Zones
There are three priority indicative heat network zones in South Lanarkshire, two are in the Almada
Street area of Hamilton, and the third is in Towers, East Kilbride. For a detailed insight into the
methodology for heat network identification, refer to Appendix D of the Strategy Document.
Heat Network Zone 1: Almada Street, Hamilton
The Almada indicative heat network zone has an area of 865,998 m2. Within the outlined zone
there are seven buildings registering a total estimated annual heat demand of 18,515 MWh/yr.
There is a high heat density within this cluster with pockets of high heat demand (above 150
kWh/m²/yr.) which neighbour areas of lower heat demand (50-150 kWh/m²/yr.).
Key anchor loads include the First Endeavour new build housing development site, Hamilton Water
Palace, Almada Street Council Headquarters and Holy Cross High School. There are six existing
natural gas fuelled heat networks (one still in development at the time of writing) either overlapping
a large extent of the indicative heat network zone or neighbouring it. This offers considerable
potential for network expansion. 
224

Page 225

Error! Reference source not found. 11 
With support from the Scottish Government Heat Network Support Unit, a feasibility study has
already been conducted for this site. A key driver for the investigation of this heat network is the
age and condition of the existing heating system in the Council headquarters buildings. This
heating system is outdated and in need of replacement to decarbonise. Previous studies have
investigated different heating technology options for the building, including gas-fired combined heat
and power (CHP) and air source heat pumps (ASHP). However, the proximity of the headquarters
to other public / semi-public buildings, with significant heat demands mean that there is an
opportunity for a heat network. In addition, these buildings all currently use gas fed boiler systems
which require transition to an alternative ZDEH. Development of a heat network in this area would
ensure this target is met.
The next step is to develop an Outline Business Case (OBC) to understand the strategic,
management, technical, economic, and financial cases for developing a heat network in Hamilton. 
Further work is also required to develop an appropriate financial delivery model for the scheme,
which will include an outline contractual agreement for the non-council-owned buildings. 
Figure 1: Indicative Heat Network Zones 1 and 2: Almada Street, Hamilton.
Priority clusters have been identified based on a 4,000 kWh/yr/m linear heat density (a means of relating
annual heat demand to a distance), while a 500m buffer around existing heat network approximates the
area within which heat serves. 
225

Page 226

Error! Reference source not found. 12
Table 1: Breakdown of existing heat networks by proximity and fuel type in Almada
Name Proximity Description Connections
to Buildings
Number of
Customers
Almada Street Within the
cluster In development - - 
Almada Street HQ  Within the
cluster Natural gas boiler 1 10
Victoria Court Intersects
cluster top left Natural gas boiler 22 22
Dewar House
Intersects
cluster bottom
right
Natural gas boiler
16 16
Brandon House
Business Centre
Intersects
cluster bottom
right
Natural gas boiler
1 19
Woodburn Court
Intersects
cluster bottom
right
Natural gas boiler
32 32 
226

Page 227

Error! Reference source not found. 13
Heat Network Zone 2: Almada Street Extension
To the east of the Almada heat network zone is another, albeit smaller, indicative heat network
cluster covering an area of 345,273 m2 (see Figure 2). While there are two buildings registering a
total heat demand of 4,957 MWh/yr, there is a low density of additional heat loads nearby indicated
by the sparse distribution of orange/yellow heat demand rasters1 near the red ones. The key
anchor loads include the Hamilton Palace Sports Ground and David Lloyd Gym - Hamilton. There
is also an existing gas fuelled heat network that intersects the top left of the cluster. The potential
for expanding the heat network zone to include this system will need to be investigated further. 
Figure 2: Detail of Indicative Heat Network Zone 2: Almada Street Extension 
Table 2: Breakdown of existing heat network by proximity and fuel type in Almada Street
Name Proximity Description Connections
to Buildings
Number of
customers
Almada Street HQ Intersects top left
cluster
Natural gas
boiler
1 10 
1 A raster is a matrix of squares, or grid, used as a method of data analysis in GIS. Each cell in the grid contains a value
representing information on the cell’s contents.
227

Page 228

Error! Reference source not found. 14
Heat Network Zone 3: Towers
The final indicative priority heat network zone identified in Towers has an area of 493,847 m2.
There are two key anchor loads including South Lanarkshire College and a Nuffield Health Fitness
and Wellbeing Gym registering 2,270 MWh/yr of heat. There are also parts of the cluster which
have high heat demands of over 150 kWh/m²/yr. According to the data, there are three gas-fuelled
communal heating systems within the cluster. There are a further two existing communal heating
systems just outside of the indicative heat network zone, one of which is gas-fuelled, and the other
is CHP. 
Table 3: Breakdown of existing heat networks by proximity and fuel type in Towers, East Kilbride
Name Proximity Description Connections
to Buildings
Number of
customers
White Cart Tower Within cluster Natural gas boiler 1 108
Clyde Tower Within cluster Natural gas boiler 1 114
Calder Tower Within cluster Natural gas boiler 1 91
James Watt
Avenue/Scottish
Enterprise Tech Park
Outside cluster Natural gas boiler
1 30
Nasmyth Building Outside cluster CHP plant 1 70 
Figure 3: Indicative Heat Network Zone 3: Towers, East Kilbride
228

Page 229

Error! Reference source not found. 15
3.3. Further Heat Network Opportunities
The following eight indicative heat network zones have smaller area sizes than the priority three
clusters shown above and should be considered as additional opportunities. Further exploration
will be required to assess viability of these opportunities. This is likely to include:
• Determining existing system capacity and suitability for expansion
• Site inspections
• Design considerations such as heat source appraisal (e.g. ASHP, GSHP), energy centre
location and layout, grid capacity constraints, pipework distribution routes, operating
temperatures, individual building upgrades required (e.g. heat interface unit installation) 
• Economic analysis to assess commercial viability.
• Funding options
• Stakeholder engagement plan
Opportunity 1: Hamilton International Technology Park
This indicative zone in Hamilton Technology Park has a high density of heat demand, as indicated
by the large presence of red rasters in Figure 4. One of the anchor loads is the new University of
the West of Scotland campus. The Council has also recently taken ownership of one of the
industrial units in Livingstone Boulevard, which could improve the feasibility of a heat network here.
An existing heat network at Kilpatrick House intersects much of the heat network cluster, although
its use for heat extraction will need to be further explored. 
Figure 4: Further heat network opportunity 1 in Hamilton 
229

Page 230

Error! Reference source not found. 16
Table 4: Breakdown of existing heat networks by proximity and fuel type in Hamilton
Name Proximity Description Connections
to Buildings
Number of
customers
Kilpatrick House,
Hamilton
International Park
Within the
cluster Technology "unknown"
1 3
Opportunity 2: East Kilbride Town Centre
This indicative heat network zone has a high density of heat demand as indicated by the large
presence of connecting red rasters in Figure 5. Three existing operational gas-fuelled heat
networks (see Table Table 5) intersect the heat network cluster. Further exploration of the viability
of development in this indicative zone is required. The next step for assessing the feasibility of this
indicative zone is to review the East Kilbride Town Centre masterplan to align a potential heat
network with planned future development and assess its commercial viability.   
Figure 5: Further heat network opportunity 2 in East Kilbride Town Centre.
Table 5: Breakdown of existing heat networks by proximity and fuel type in East Kilbride Town
Centre
Name Proximity Description Connections
to properties
Number of
customers
Wellbeck House
Sheltered Housing Above cluster
Operational
natural gas
boiler
- 14
230

Page 231

Error! Reference source not found. 17 
Opportunity 3: Carluke
This heat network cluster has heat demands of over 150 kWh/m²/yr where Carluke High School
and Carluke Leisure Centre are situated. There is also a gas-fuelled heat network intersecting
much of the outlined heat network zone (see Table 6). Further exploration is required to assess
viability of extending the existing heat network, as described at the start of this section. 
Figure 6: Further heat network opportunity 3 in Carluke 
Table 6: Breakdown of existing heat networks by proximity and fuel type in Carluke
Name Proximity Description Connections to
properties
Number of
customers
Rosemount
Court
Left of
cluster Natural gas boiler  22 22 
Deer Park
Intersects
bottom of
cluster
Natural gas
boiler
1 34
Archibald Kelly Court
Intersects
bottom of
cluster
Natural gas
boiler
24 24
231

Page 232

Error! Reference source not found. 18 
Opportunity 4: East Kilbride (1)
This cluster includes a single anchor load, Sanderson High School, in excess of 150kWh/m²yr.
There is a gas-fuelled heat network intersecting part of the cluster. To the south there is a priority
heat network in Towers. The proximity of this cluster means that it could be considered as part of a
wider heat network scheme covering the town centre and neighbouring residential areas within
East Kilbride. 
Figure 7: Further heat network opportunity 4 in East Kilbride (1)
Table 7: Breakdown of existing heat networks by proximity and fuel type in East Kilbride (1)
Name Proximity Description Connections
to properties
Number of
customers
White Cart Tower Radius intersects
bottom of cluster
Natural gas
boiler
108 108
Calder Tower Within cluster Natural gas
boiler
1 91
Clyde Tower Within cluster Natural gas
boiler
1 114 
232

Page 233

Error! Reference source not found. 19
Opportunity 5: East Kilbride 2
This indicative zone is a small heat network cluster with low heat density centred around Duncanrig
Secondary School currently serving a primarily residential area. Two existing gas-powered heat
networks (see Table 8) intersect much of the cluster opportunity providing potential opportunity for
expansion of this heat network. 
Figure 8: Further heat network opportunity 5 in East Kilbride (2) 
Table 8: Breakdown of existing heat networks by proximity and fuel type in East Kilbride (2)
Name Proximity Description Connections
to properties
Number of
customers
Canberra House Outwith cluster Natural gas
boiler
1 33
Canberra House
Sheltered Housing Outwith cluster Natural gas
boiler
- 33 
233

Page 234

Error! Reference source not found. 20
Opportunity 6: Blantyre (Leisure Centre)
This heat network opportunity cluster has been identified due to its high heat load coming from
Blantyre Sports Centre and the Blantyre miners’ welfare indoor bowling club. The cluster has a
moderate heat density with high, but non-continuous, heat demands of above 150 kWh/m²/yr.
Currently, the cluster serves domestic properties. For this indicative zone South Lanarkshire
Council will review the local development plans to assess potential benefit and financial viability of
a heat network here in the near future. 
Figure 9: Further heat network opportunity 6 in Blantyre 
234

Page 235

Error! Reference source not found. 21
Opportunity 7: East Kilbride (Hairmyres Hospital)
This small cluster is served by two anchor points within Hairmyres Hospital with very high heat
loads of above 500 MWh. However, heat density is low as indicated by the sparse distribution of
red rasters. The cluster has potential to serve domestic properties nearby and lower load non-
domestic properties. A robust assessment of the business case for heat network development in
this area will determine financial viability of the project. Future planned developments in this area
will be assessed by the Council for heat network connection viability. 
Figure 10: Further heat network opportunity 7 around Hairmyres Hospital 
235

Page 236

Error! Reference source not found. 22
Opportunity 8: Eastfield (South Lanarkshire Lifestyles Eastfield) 
This cluster is served by South Lanarkshire Lifestyle Eastfield with pockets of high heat demand of
above 150 kWh/m²/yr in Trinity High School and Eastfield. The cluster would only serve a small
number of domestic properties (247) nearby making financial viability challenging for this cluster.
However, future planned development will be assessed by the Council to understand the viability of
a heat network here. 
Figure 11: Further heat network opportunity 8 in Eastfield 
Clyde Gateway D2 Grids Project
This EU-funded project is a fifth-generation district heat and cold (5GDHC) grid which uses lower
temperature. This provides opportunities for using low grade or ambient heat to supply buildings,
with low levels of heat loss. This system integrates well with office buildings and there is a pilot
project focussed on the proposed developments at Shawfield as part of the Clyde Gateway
regeneration. South Lanarkshire Council will review possible extension to the grid to connect
properties in South Lanarkshire.  
236

Page 237

Error! Reference source not found. 23
3.4. Summary of Actions for Heat Networks
Action Priority Description Responsibility
Undertake Building
Assessment Reports
(BAR) for all council-
owned public buildings
Immediate  South Lanarkshire Council will lead by
example and undertake BARs for all
its public buildings. These will be
prioritised in the delivery areas
outlined above. 
Section Leader
(Legislative),
Housing &
Technical
Resources
Business Case for
Almada Street heat
network
Immediate Progress with Outline Business Case.  Executive
Director of
Housing &
Technical
Resources; Heat
Network Support
Unit
Delivery Model for
Almada Street heat
network developed
and approved
Immediate Develop suitable delivery model for
Almada Street heat network. This
model may be suitable for future heat
network opportunities in South
Lanarkshire. 
Housing &
Technical
Resources /
Community &
Enterprise
Resources
Conduct feasibility
studies for the
identified priority heat
network zones
Medium-
term
Undertake detailed feasibility studies
to fully assess the financial and
technical viability of 10 indicative heat
network zones. (A feasibility study for
the Almada Street network is already
complete.)
Housing &
Technical
Resources /
Community &
Enterprise
Resources
Review Local
Development Plans to
assess viability of
opportunities 
Immediate Review LDP for future planned
development in the identified heat
network zones (see 3.3).
Head of
Planning and
Regulatory
Services,
Community &
Enterprise
Resources
Designate heat
network zones
Medium-
term
Once BARs and feasibility studies
have been completed these could be
designated as zones to give clear
opportunities for investment.
Head of
Planning and
Regulatory
Services,
Community &
Enterprise
Resources 
237

Page 238

Error! Reference source not found. 24
3.5. Funding Heat Networks
Currently there is an under-developed pipeline of heat network projects across Scotland. The
Scottish Government is providing funding to stimulate and accelerate the development and growth
of heat networks, as detailed below. Significant investment from the private sector and heat
network developers is also required to achieve heat network deployment at the scale required to
reach the national targets of 2.6 TWh of heat output by 2027 and 6 TWh of output by 2030. 
Scotland’s Heat Network Fund is designed to support the development and roll out of heat
networks across Scotland. It is open to any organisation seeking to develop and deploy heat
networks in Scotland. In total £300 million is being made available to stimulate investment and
grow the low carbon heat sector. The project must be large scale, deliver emissions reductions,
and demonstrate a positive social and economic benefit. Applications can be made for enabling
costs, commercialisation costs, and capital costs. The SHNF will only support projects that would
not progress without capital grant funding or would not progress to the same scale. Therefore,
applicants to the scheme need to clearly demonstrate the how the grant money will be used to
expand the project outcomes and provide evidence the value of the grant is appropriate. Up to a
maximum of 50% of the total eligible capital costs can be covered through this fund. 
The District Heating Loan Fund offers low interest unsecured loans of more than £1 million
designed to help address the financial and technical barriers to district heating projects. This fund
offers an alternative to commercial borrowing which can be expensive and difficult to obtain.
Repayment terms are either 10 or 15 years and larger projects above £500,000 will be considered
on a case-by-case basis. This scheme is open to local authorities, registered social landlords,
small and medium sized enterprises, and energy service companies with fewer than 250
employees. 
The Heat Network Support Unit identifies, supports, and develops heat network projects for the
public sector. The support available includes expert advice and grant funding to develop projects
until they have a clear financial strategy and well-defined business model. The unit is active in
project identification, aggregation, and stakeholder engagement and can support with working
group management, stakeholder workshops, and policy linkage and review. 
238

Page 239

Error! Reference source not found. 25
4. Social Housing and Mixed-Tenure
Delivery Areas
The actions and delivery areas outlined in this section give an indication of the range of steps
required to deliver progress on the LHEES. This includes initial activities such as developing plans
to ensure effective prioritisation of retrofit across social rented properties. This section also outlines
some area-specific projects at different stages of implementation. As this is a live document,
further delivery actions will be identified over the course of the first five-year LHEES delivery
phase. 
4.1. Priority Delivery Areas 
The delivery areas detailed below have been identified in line with two of South Lanarkshire’s
priorities set out in the LHEES Strategy: 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition
and energy efficiency of housing across all tenures to ensure that poor energy performance
is removed as a driver of fuel poverty. 
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change. 
2a: South Lanarkshire Council will lead by example by transitioning all council-owned
properties to ZDEH, and no longer installing gas boilers. 
Targeting fuel poverty
Analysis has been conducted to identify the areas of South Lanarkshire most at risk of fuel poverty.
The results from this analysis will be used by the Council to ensure it is effectively prioritising
resources to have the greatest impact in tackling fuel poverty. A summary of the analysis findings
is provided below: 
The Scottish Index for Multiple Deprivation (SIMD) dataset has been used as a proxy to identify
fuel poverty within South Lanarkshire. Almost half of the total properties owned by the Council fall
within the most deprived SIMD deciles (deciles one and two). This illustrates a strong link between
the social housing tenure type and areas with high SIMD scores. 
With a priority of alleviating fuel poverty, the Council has used the LHEES process to investigate
areas of high probability of multiple deprivation. Within the social housing sector, the five data
zones with highest rates of deprivation (top 20%), have been analysed below in Table :  
239

Page 240

Error! Reference source not found. 26
Table 9: The five data zones with the highest number of social housing properties which are within
SIMD deciles 1-2 
Data zone reference (top 5) Number of properties within SIMD deciles
1-2
Hareleeshill - 01 347
Whitlawburn and Greenlees – 02 296
Fernhill and Cathkin – 04 288
Cambuslang Central – 04 281
Strutherhill – 02 275 
To identify priority delivery areas, social housing SIMD deciles 1-2 have been combined properties
in ‘heat pump readiness’ category 1 (those most suited to a transition from fossil fuel heat sources,
as they are generally already well-insulated. See Strategy for full explanation of Categories 0-3 for
on and off gas properties). These properties generally have higher levels of energy efficiency than
properties in category 2 or 3. Therefore, there is a lower risk of increasing fuel poverty rates
through electrification of heat.2  
A total of 1,680 properties which are connected to the gas grid meet the criteria, this equates to 6%
of the total social housing stock. Strutherhill data zone at the top of the list in Table 9 also appears
in the top five when looking at SIMD in isolation (as per Table ) with the majority of the 275
properties highlighted being category 1. 
Table 9: The five data zones with the highest number of social housing Category 1 properties on
the gas grid, which are within SIMD deciles 1-2 
Data zone reference (top 5) Number of properties within SIMD deciles
1-2
Strutherhill – 02 194
Westburn and Newton - 05 91
Hillhouse – 03 76
Vicarland and Cairns 73
Westburn and Newton – 06 68 
A similar exercise was carried out for off-gas properties, highlighting around 4,700 properties in
total. Three data zones listed in Table 10 are close geographically, potentially providing economies
of scale price reduction benefits for any retrofit programmes. 
Cambuslang features within both Table  and Table 10, indicating that it is an area that should be
targeted within the Council’s social housing investment programme, and that it has a high
concentration of heat pump ready properties. 
2 The current price differential between gas and electricity means that replacing gas heating systems with electric heating
systems could lead to an increase in energy bills. Until this price differential is addressed by the UK Government, South
Lanarkshire Council will focus on ‘category 1’ properties for the electrification of heat, as they are likely to have lower
heat demand. This is to reduce the risk of increasing householders’ energy bills. 
240

Page 241

Error! Reference source not found. 27
Table 10: The 5 data zones with the highest number of Category 1 properties off the gas grid,
which are within SIMD deciles 1-2
Data zone reference (top 5) Number of properties within SIMD deciles
1-2
Cambuslang Central – 04 223
Burnhill and Bankhead North - 05 135
Burnbank Central and Udston - 05 133
Hareleeshill -01 132
Shawfield and Clincarthill - 04 127 
Existing communal heating systems
The Council currently has 15 communal heating systems, 12 of which are in sheltered
accommodation and three in multi-storey blocks. All these networks are currently using fossil fuels
as the heat source. A decarbonisation programme will be developed to transition these existing 15
systems to zero emissions heat sources. The first area of delivery for this is the tower blocks in
Calderwood, East Kilbride.
Mixed-Tenure Multi-Storey Blocks in Calderwood 
The Council commissioned a consultant to carry out a feasibility study into the potential for
installing a communal ground source heating system for the Calderwood multi-storey blocks. All six
blocks have mixed tenure with several privately owned flats in each block. 
The study confirmed that a communal closed loop ground source heat pump system provides the
best solution for reducing carbon emissions, energy usage and the cost of heating homes. The
feasibility study confirms that a fabric first approach is the best approach to ensure correct sizing of
the heat pumps. A technology appraisal has been completed to identify a suitable unit combing an
internal heat pump and hot water cylinder to be installed in each flat. A suitability assessment has
also been conducted to identify the location of boreholes. To progress this project the Council will
decide on an insulation approach (external or internal wall insulation).   
There is a further opportunity to expand the network to the wider Calderwood area, incorporating a
further 20 blocks. Technical site visits are required to assess the individual sites and confirm the
positioning of boreholes. In addition to the residential properties the larger area plan creates the
opportunity to include larger anchor loads including a church and community hall and Long
Calderwood Primary School which currently has a gas boiler and ground space for boreholes. In
addition to the public buildings there is a privately owned care home and assisted living complex
that could be included. 
Town Centre Masterplans 
In response to the challenges facing our town centres, masterplans have been developed for
Hamilton and East Kilbride. Both the Hamilton and East Kilbride plans share an ambition to
achieve local and national net zero goals. This will be achieved by working towards carbon zero
objectives and a more circular economy, generating localised renewable energy and recycling
241

Page 242

Error! Reference source not found. 28
materials. For example, both masterplans will consider district heating networks as part of new
housing provision and, following the principles of NPF4, both plans look to repurpose and reuse of
buildings alongside reuse of materials.
4.2. Summary of actions for social housing and mixed-
tenure properties
Action Priority Description Responsibility
Engage with Registered
Social Landlords in
South Lanarkshire to
establish progress and
future plans against
LHESS outcomes
Immediate Engage with RSLs to ensure their
plans and progress are included
within the LHEES and Delivery
Plan.
Executive Director
of Housing &
Technical
Resources and
RSLs
Improve the energy
efficiency of Council
housing stock
Immediate Implement a programme to improve
the thermal performance of council
housing stock, as part of the
Housing Capital Programme. 
Fabric first approach is embedded
in the Council’s Housing Investment
Plan to 2032.
Executive Director
of Housing &
Technical
Resources
Target capital
investment in housing in
areas at risk of fuel
poverty
Immediate Energy efficiency measures as part
of the Housing Capital Programme
are prioritised in areas where
tenants are at a higher risk of fuel
poverty or extreme fuel poverty,
based on the findings from the fuel
poverty analysis. 
Executive Director
of Housing &
Technical
Resources
Cease all gas-boiler
installations in council
housing stock
Immediate The Council will no longer
programme gas boiler replacements
except in exceptional cases (e.g.,
system failure where there is no
time to install a zero-emissions
heating system).
Executive Director
of Housing &
Technical
Resources
Calderwood multi-storey
heating upgrades
Immediate Progress with recommendations
from feasibility study.
Executive Director
of Housing &
Technical
Resources
Use ABS programmes
to retrofit mixed-tenure
buildings
Immediate Previous Area Based Schemes
have been highly effective in
delivering measures in mixed tenure
buildings. The Council will work with
Executive Director
of Housing &
Technical
Resources in
242

Page 243

Error! Reference source not found. 29
Housing Associations and other
local stakeholders to identify and
deliver mixed tenure projects, as
this is an LHEES priority for South
Lanarkshire.
partnership with
Housing
Associations and
other local
stakeholders
Programme of
decarbonisation for
existing communal
heating systems
Medium-
term
Identify appropriate heat sources
and upgrade the 15 existing
systems.
Executive Director
of Housing &
Technical
Resources
Meet Social Housing
Net Zero Standard3
(SHNZS) requirements
when confirmed
Medium-
term 
Develop South Lanarkshire
Council’s strategic approach to
meeting the new standard.
Executive Director
of Housing &
Technical
Resources 
4.3. Funding available for social housing and mixed
tenure
Social housing
The Social Housing Net Zero Heat Fund supports social housing landlords across Scotland to
install zero direct emission heating systems and energy efficiency measures. Funding for “fabric
first” energy efficiency projects is also available; however, applicants are required to demonstrate a
commitment to installing eligible ZDEH systems into these properties. There is currently £200
million available over five years up to 2026 and the fund supports capital costs and resource
support to help build a pipeline of future projects. The fund can cover up to a maximum of 60% of
total capital expenditure costs for ZDEH elements and 50% of the fabric and energy efficiency
measures.
Mixed tenure
Energy Efficient Scotland: Area Based Schemes (ABS) are designed and delivered by local
authorities, in combination with utility companies and local delivery partners. This funding is
provided by Scottish Government. Schemes are targeted in areas in or at risk of fuel poverty and is
intended for owner-occupiers and private landlords. ABS has historically focussed on installing
single insulation measures but is now expanding to a ‘whole house’ approach and includes other
measures such as zero emissions heating systems. By working on an area-based delivery model,
the programme enables mixed-tenure projects, bringing together homeowners, housing
associations, and private landlords. 
3 See Social housing net zero standard: Consultation. An explanation of the relevance of SHNZS to LHEES
is given in South Lanarkshire’s LHEES Strategy.
243

Page 244

Error! Reference source not found. 30
5. Private Tenure Housing Delivery   
Areas
5.1. Priority Delivery Areas 
The delivery areas detailed below have been identified in line with two of South Lanarkshire’s
priorities set out in the LHEES Strategy: 
Priority 1: Reduce heat demand using a fabric first approach to improve the condition
and energy efficiency of housing across all tenures to ensure that poor energy performance
is removed as a driver of fuel poverty. 
Priority 2: Transition to zero direct emissions heating systems in buildings across South
Lanarkshire to tackle climate change. 
2b: South Lanarkshire Council will actively support, encourage, and enable owner-occupiers
and private sector landlords to retrofit homes.  
Owner-occupied homes
The Heat in Buildings Bill Consultation proposes a minimum energy efficiency standard which
owner-occupied homes must meet by 2033. The outcome of this consultation is yet to be
published. However, this will determine the drivers, goals, and timescales to which owner-
occupiers will need to respond. The Council will revise plans at this stage to understand the best
way to support households.
Private Rented Sector
Private rented accommodation generally has poorer energy efficiency than domestic tenures. It is
likely that homes in the private rented sector will be required to meet a minimum energy efficiency
standard sooner than owner-occupied homes. The Scottish Government is currently consulting on
the proposal to create a new ‘Heat in Buildings Standard’. Private landlords are likely to be
required to meet the standard by the end of 2028.  
Identifying delivery areas
South Lanarkshire Council is using data outputs from LHEES to identify suitable clusters of private
tenure housing for retrofit. Key characteristics such as construction type, heating systems, EPC
and SIMD ratings will be used to develop a short list of clusters for further engagement. 
The Council will facilitate stakeholder engagement sessions with relevant parties to discuss next
steps in developing a targeted retrofit strategy with property owners (landlords and owner-
occupiers). At this stage a process of data confirmation will also be carried out.  
244

Page 245

Error! Reference source not found. 31
5.2. Summary of actions for private tenure housing 
Action Priority Description Responsibility
Confirm delivery areas
for private tenure
housing
Immediate Using the Power BI tool
developed as part of this LHEES,
the Council will identify and
confirm delivery areas.
Executive Director of
Housing & Technical
Resources
Community group
engagement
Immediate Support community groups and
other stakeholders to promote
retrofit and assist householders
with navigating the challenges.
Lanarkshire Climate
Hub/Community &
Enterprise
Resources/Finance
& Corporate
Resources
Direct engagement with
property owners (both
owner-occupiers and
private landlords)
Immediate Develop a targeted retrofit
strategy with property owners, in
response to Heat in Buildings Bill.
South Lanarkshire
Council
Website/Home
Energy Scotland
Target ABS funding to
facilitate retrofit of
private housing at risk
of fuel poverty
Immediate The identified delivery areas will
be used to help inform the
targeting of area-based schemes. 
ABS programmes will reflect the
needs of local communities set
out in Local Housing Strategies
(LHS) and LHEES.
Executive Director of
Housing & Technical
Resources with
Housing
Associations and
other local
stakeholders
Target ECO4 funding to
facilitate retrofit in areas
with a high risk of fuel
poverty.
Immediate Use identified delivery areas to
inform targeting of ECO4 Flex.
This may require a review of the
current Statement of Intent. 
Executive Director of
Housing & Technical
Resources in
partnership with
energy suppliers and
installers. 
Support private sector
landlords to meet the
minimum energy
efficiency standards
Immediate Support landlords of privately
rented properties to understand
and meet their obligations.
Signpost to advice and funding
available. 
Executive Director of
Housing & Technical
Resources with
partners such as
Home Energy
Scotland 
5.3. Funding available for private tenure housing 
Energy Efficient Scotland: Area Based Schemes (ABS) are designed and delivered by local
authorities, in combination with utility companies and local delivery partners. As described in 4.3,
245

Page 246

Error! Reference source not found. 32
by working on an area-based delivery model, the programme enables mixed-tenure projects,
bringing together homeowners, housing associations, and private landlords. 
Owner-occupiers 
The HES grant and loan is available to homeowners and offers grant funding for heat pumps of
£7,500, or £9,000 to those living in rural areas. There is also £7,500 available as an optional
interest free loan to further help towards the installation of a heat pump. £6,000 of interest free loan
funding is available for households for solar PV panels when taken as a package of measures
including a heat pump. In addition to this funding, up to 75% of the cost of energy efficiency
measures can be covered by grant funding, up to a maximum of £7,500 or £9,000 in rural areas.
The final 25% can be covered by an interest free loan or paid by the customer as the loan is
optional. These energy efficiency measures include but are not limited to cavity wall insulation,
solid wall insulation, loft insulation, and floor insulation.
Warmer Homes Scotland (WHS) offers funding and support to households struggling to stay
warm and keep on top of energy bills. This programme is available for homeowners and private
sector tenants. WHS takes a ‘whole house’ approach, offering eligible households a bespoke
package of measures that take account of both the needs of the property and the needs of the
household. Heating measure installations are not available in private rented properties. This
programme is most often fully grant funded and potential improvements include wall insulation, loft
insulation, draught-proofing, central heating, and renewables. Households must meet the eligibility
criteria4 and live in a property with a low efficiency rating. Interest free loans of up to £10,000 are
available for homeowners or landlords who require further assistance to help pay a contribution
towards the work.
The Energy Company Obligation (ECO 4) is in its fourth round as grant/subsidy scheme which
provides insulation and heating measures for low income, vulnerable owner occupiers. The
measures and funding available are based on specific eligibility criteria and can include insulation,
district heating connection, renewable measures, heating installation and repair. This funding is
managed through Ofgem, with energy companies determining which retrofit projects they choose
to fund and what level of funding they provide. It is available to households in an Affordable
Warmth Group in receipt of benefits or tax credits. This fund is also available to households in
properties with and EPC D, E, F, or G. 
ECO Flex is a household referral mechanism made available through the wider ECO 4 scheme.
This program allows local authorities to widen the eligibility criteria to include households that
would otherwise not be eligible through the ECO 4 standard criteria. Under this scheme,
participating local authorities can refer owner occupied and private tenured households considered
to be at risk of living in fuel poverty or on low income and vulnerable to the impacts of living in a
cold home. 
The Great British Insulation Scheme (GBIS) complements ECO 4 and is designed to deliver
improvements to the least energy efficient homes in Great Britain. The aim of the scheme is to
tackle fuel poverty and help reduce energy bills by supporting low-income and vulnerable 
4 Eligibility criteria detailed on the Home Energy Scotland website
246

Page 247

Error! Reference source not found. 33
households. Unlike the ECO 4 ‘whole house’ approach, GBIS will mostly deliver single insulation
measures. In Scotland this scheme is available to homes with an EPC rating of D-G and within
council tax bands of A-E. 
Private rented sector
The Private Rented Sector Landlord loan offers loan funding for registered landlords. This
funding can be used to cover the costs of energy efficiency improvements including but not limited
to glazing, insulation, renewables, and even connections to district heating schemes. The funding
available varies based on the number of properties owned by the landlord and the measures that
are being installed. Generally, up to £15,000 can be borrowed per property for energy efficiency
measures and conditions vary dependant on the amount borrowed. Up to £17,500 is available for
up to two renewable systems per property and a maximum £6,000 is available for energy storage.  
247

Page 248

Error! Reference source not found. 34
6. Non-Domestic Delivery Areas
6.1. Priority Delivery Areas
Data is limited on non-domestic buildings, as many existing datasets are incomplete. Energy
efficiency upgrade information is not currently well-reported in the non-domestic sector. 5 This is an
issue across Scotland. Therefore, a priority action to enable to identification of delivery areas is to
collect data on non-domestic buildings in South Lanarkshire, for example through undertaking
Building Assessment Reports (BARs6). The role of a BAR is to help assess the suitability of a non-
domestic property for connecting to a heat network, as defined in Part 5 of the Heat Networks
(Scotland) Act 20217. The primary use of BAR information is to inform decisions on the particular
suitability of areas for the construction and operation of a heat network, and subsequently to inform
designation decisions, should these areas be progressed for consideration for designation.
Primary School Estate
South Lanarkshire Council has undertaken feasibility studies carried out into the works required to
meet the zero emissions targets by 2038. The Council will identify measures and suitable
technologies to be implemented across the whole primary school estate, where possible,
upgrading the whole building envelope. The Council will also investigate the feasibility of installing
solar PV on all primary schools. 
Our Lady of Lourdes Primary 
The Council were recently successful with a bid to Scotland’s Public Sector Heat Decarbonisation
Fund to support the retrofit and refurbishment works to Our Lady of Lourdes Primary in East
Kilbride by delivering a Net Zero schools demonstrator project. The project will replace the current
gas heating system with a clean heat Air Source Heat Pump array. This project will be delivered
alongside East Kilbride Community Growth Area and will ensure that we are satisfying anticipated
increase in demand from new housing development and increased nursery provision locally. 
The refurbishment works will include: 
• replace existing gas boilers with new ASHP system
• replacement roofing including insulation
• over cladding including insulation
• new electrical light fittings and rewire
• mechanical ventilation 
The energy efficiency/ new heating phase of the project commenced in April 2024 and is due to
complete by August 2024. 
5 An evidence review of data associated with non-domestic buildings (2022)
6 Heat networks: Building Assessment Report (BAR) guidance - gov.scot (www.gov.scot)
7 Heat Networks (Scotland) Act 2021 (legislation.gov.uk)
248

Page 249

Error! Reference source not found. 35
Larkhall Leisure Centre 
The Council are constructing a new leisure centre in Larkhall. The outline design is based on
facilities prioritised by residents in an online survey carried out in 2022. This building will be built to
a high energy efficiency standard (for example Passivhaus or Breeam excellent) including a low or
zero carbon heating solution, with any residual carbon being offset through carbon sequestration.   
To meet future climate change and sustainable energy targets, it is essential that this building is
planned and designed to be carbon neutral (embodied and operational) through orientation of
building, use of natural resources such as ventilation, light, heat and water, green infrastructure,
sourcing materials and equipment, energy efficiency achieved by latest technology. 
6.2. Summary of actions for non-domestic buildings
Action Priority Description Responsibility
Continue to improve
the energy efficiency
of Council-owned
non-domestic
properties
Immediate Utilise the Central Energy Efficiency
Fund (CEEF) Programme to
undertake energy efficiency projects.
Executive
Director of
Housing &
Technical
Resources
All new or
replacement heating
systems in Council
buildings to be zero
direct emissions
Immediate The Council will take a zero
emissions-first approach to heating
system replacement, with new or
replacement heating systems
designed to be compliant with public
bodies duties set under Section 44 of
the Climate Change Act and the net
zero declarations made by the
Council.
Executive
Director of
Housing &
Technical
Resources
Primary school solar
PV feasibility
Immediate Carry out a desktop study of the
entire primary school portfolio of all
128 schools using existing data to
assess the schools and consider if
the roofs can have PV panels
installed, or in the case of the
existing PV arrays on the school
roofs, could these be expanded or
increased.
Executive
Director of
Housing &
Technical
Resources
Net zero primary
schools
Medium-term Based on the findings from net zero
feasibility studies of primary schools,
the Council will identify measures
and suitable technologies to be
implemented across the whole
Executive
Director of
Housing &
Technical
Resources
249

Page 250

Error! Reference source not found. 36
primary school estate, where
possible, upgrading the whole
building envelope.
Complete BAR
updates for all non-
domestic stock
Medium-term Improve accuracy of non-domestic
data by carrying out building
assessment reports. Using this new
dataset, further assessments of heat
network viability will be carried out
using the LHEES standard
methodology.
Section Leader
(Legislative),
Housing &
Technical
Resources 
6.3. Funding available for non-domestic buildings
The Community and Renewable Energy Scheme (CARES) aims to accelerate progress towards
the Scottish Government’s target of 2GW of community and locally owned energy by 2030.
CARES encourages local or community ownership of renewable energy across Scotland and
provides funding and support for community groups to install renewable energy generation. This is
achieved by working with a network of regional development officers that provide free impartial
advice and support to communities. CARES supports a wide variety of projects ranging from
renewable technologies in community buildings, community benefits, and shared ownership.
CARES funding is expected to form part of a project’s funding package along with other loans,
community shares, bonds, etc. It offers a range of support which can be found below. 
• The Community Heat Development Programme is a service designed to provide
community organisations and groups of householders help to develop their ideas for locally
generated, low, and zero carbon heat projects. This programme does not offer direct
funding but will discuss the feasibility of the community heat project idea and provide advice
on next steps, including advise on where to look for potential funding.
• The Community Buildings Fund offers an 80% grant of up to £80,000 to decarbonise
your community building. This fund can cover the costs of installing energy efficiency
measures and renewable technologies such as heat pumps, batteries, and solar PV. This
fund is set to run until the end of March 2025, subject to availability.   
• The Let’s Do Net Zero: Off Electricity Grid Communities Fund provides capital funding
through to March 2024. There is no upper limit of application amount and up to 90% grant
funding is available. This fund can be used for a range of projects including but not limited
to developing zero carbon heat, upgrading energy infrastructure, energy storage and/or
renewable energy generation, project management, and professional advice. The overall
funding available for capital works for 2023-2024 is £3,000,000 and therefore CARES may
not be able to fully meet the requested funding. 
The Scottish National Investment Bank is supporting the public and private sector to provide
long-term capital to businesses and projects across Scotland to help develop a fairer, more
sustainable economy. The Bank’s ambition is to not only use public capital but to leverage
additional private capital to support the delivery of its mission. The Bank will receive its capital
returned along with additional income generated at the end of the investment term. The bank will
250

Page 251

Error! Reference source not found. 37
help identify, develop, and assess investment opportunities and make investments to deliver its
mission. 
The Scottish Public Sector Heat Decarbonisation Fund is delivered by Salix on behalf of the
Scottish Government. The Scottish Government has made £20 million grant funding available in
the financial year 2023/24 for projects to decarbonise heating systems by installing zero direct
emissions systems, and for retrofit energy efficiency measures to support the overall
decarbonisation of heat in buildings. Applications should take a ‘whole building’ approach to
improve the energy efficiency of buildings as well as to ensure the optimal performance of zero-
direct emissions heating systems. Eligible organisations are local authorities, arm's length external
organisations (ALEOs), and universities The fund is currently closed for applications. 
The Scottish Public Sector Energy Efficiency Loan Scheme is also provided through Salix and
offers zero-interest loans to public sector bodies to facilitate energy efficiency improvement
projects that result in financial and carbon savings. This scheme is funded by the Scottish
Government and the loan can cover up to 75% of the total project cost. Salix offers ongoing client
and technical support on project delivery alongside networking and knowledge sharing
opportunities with other public sector peers. This scheme has a minimum loan value for a single
project of £500 with a total minimum application value of £5,000. There is no maximum loan value. 
7. Summary
This Delivery Plan is designed to sit alongside the LHEES Strategy. It provides a more detailed
view of the actions required over the next five years to decarbonise South Lanarkshire’s domestic
and non-domestic building stock. This Delivery Plan details the immediate and medium-term
actions that can be delivered now, given the existing policy landscape.
It is a statutory duty for the Council to update the LHEES every five years. Due to the urgency of
the climate emergency, and the rapidly evolving policy landscape, the Strategy and Delivery Plan
will both be reviewed and updated on an annual basis. This means they should be treated as live
documents which will respond to the introduction of new standards, regulation, and delivery
programmes, to any changes in the LHEES process, and to future opportunities within South
Lanarkshire. 
251

Page 252

252

Page 253

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire’s State of the Environment Report
2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Committee of the completion of the South Lanarkshire State of the
Environment Report 2023
 report on the key findings from the Report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the State of the Environment Report 2023 be approved and disseminated
across the Council and to relevant Council partners and external agencies for
use in the preparation of plans, policies, programmes and strategies and their
Strategic Environmental Assessment and as an information resource.
[1recs]
3. Background
3.1. The Environmental Assessment (Scotland) Act 2005 requires all public bodies,
including the Council, to undertake Strategic Environmental Assessments (SEAs) of
all plans, policies, programmes and strategies (plans). A wide range of Council-led
plans have, or are undergoing, SEA including the Community Plan, Council Plan,
Local Development Plan and the Sustainable Development and Climate Change
Strategy. 
3.2. An integral part of the SEA process is the identification and monitoring of a wide
range of environmental issues. The South Lanarkshire State of the Environment
Report is the body of data used to monitor and report Council activity against key
environmental indicators. It is the recognised source for the core data which allows
SEAs on our plans to be undertaken. 
3.3. With the declarations of ecological and climate emergencies, the State of the
Environment Report will be a vital resource in outlining South Lanarkshire’s progress
in reducing its contribution to global warming and associated impacts from climate
change on communities, the natural environment and inclusive growth and for
protecting and enhancing the area’s biodiversity assets.  
13
253

Page 254

3.4. The Covid-19 global pandemic and the cost-of-living crisis have had far reaching
impacts on South Lanarkshire across environmental considerations, particularly
related to people and their health, local air quality, waste services and climate
change. The State of the Environment Report provides an invaluable insight to these
environmental impacts. 
3.5. The first comprehensive State of the Environment Report was prepared in 2009 and
has been reviewed biennially to support SEAs and to fulfil the Council’s monitoring
obligations. The Report provides an effective means of tracking changes in the local
environment. This ensures that the council not only has a clear understanding of the
current condition of the local environment but also has the accurate environmental
baseline data needed to allow its statutory SEA and monitoring work to be
undertaken. The Report also helps to promote awareness of local environmental
issues and priorities. 
3.6. The Report itself provides and assesses data across a suite of SEA environmental
issues and also includes transport. The SEA environmental issues are: 
 Population and human health  Biodiversity, fauna and flora
 Historic and cultural heritage  Material assets and landscape
 Waste  Soil
 Air, noise and light  Water
 Climate change 
The trends identified across these issues allow the Council to assess the overall
condition of South Lanarkshire’s environment. The Report captures these as key
indicators to consistently identify where there is an opportunity to improve
environmental issues and the progress being made towards a sustainable South
Lanarkshire. 
3.7. Officers from Community and Enterprise, and Education Resources have ‘converted’
the State of the Environment Report to Glow, the digital platform used by all South
Lanarkshire Council’s schools to be used as a teaching resource. The State of the
Environment Glow site was launched in May 2019 and will be further updated
following approval of this report.   
4. Development of the Report
4.1. The 2023 edition of the State of the Environment Report has been prepared by the
Council’s Planning Officer (SEA) within Community and Enterprise Resources with
data and other contributions sourced from across the Council, partners, government
bodies and external agencies. Development of the Report has been overseen by the
Corporate SEA Working Group.   
4.2. A comprehensive review of the indicators used in the Report was undertaken by the
Corporate SEA Working Group. This was, in part, driven by the availability of new
data and also recognition that a broader range of indicators was required for
monitoring and reporting purposes. For example, indicators on the local economy,
housing and tree canopy cover have been included in the 2023 edition. This review
resulted in a reduction from 55 indicators to 47.  
254

Page 255

4.3. A healthy environment provides us with natural resources like clean air, clean water,
fertile soils, food, energy, medicine and building materials. Our long term economic
and social wellbeing ultimately depends on the environment and our natural
resources. Sustainable development is about achieving economic and social
development in a way that also enables us to protect and enhance our environment
both now and for the future. 
4.4. Sustainable development is a set of fundamental values by which we make decisions
and how we chose to live. These values are outlined in the 17 Global Sustainable
Development Goals of the United Nations 2030 Agenda for Sustainable
Development. Within the 2023 edition of the State of the Environment Report, the
relevant Sustainable Development Goal(s) are assigned to each chapter. This will
support understanding of how South Lanarkshire can contribute to achieving the
goals at both a national and global level. 
4.5. The report requires to be formally approved by the Executive Committee as its
approval has not been delegated to officers. The Report and its findings will be
promoted to a wide range of stakeholders including the Community Planning
Partnership Board and presented to other groups and forums upon request.   
5. Key Findings
5.1. The 47 indicators in the 2023 Report have each been assigned a status of ‘good’,
‘fair’ or ‘poor’, and traffic lighted as green, amber and red, respectively. Each of these
indicators also has a directional trend of either ‘improving’, ‘no change’ or
‘deteriorating’. The basis for the status identified within the tables, and accorded to
each indicator along with its trend, is demonstrated by the information contained
within the explanation column included as part of Appendix 1. The status of each
indicator is based on an opinion agreed by the Corporate SEA Working Group. 
5.2. The findings from the Report are illustrated in the following table and summarised in
Appendix 1. 
Status/Trend Improving Unchanged Deteriorating Total
Good 11 6 0 17 36.2%
Fair 8 14 1 23 48.9%
Poor 3 2 2 7 14.9%
Total 22 22 3 47 100% 
5.3. The Report highlighted that 17 (36.2%) of the 47 key indicators had ‘good’ status and
that 11 of these have a trend that is improving. These improvements include a
continuous reduction in our greenhouse gas emissions and an increase in our
renewable energy capacity. There has been a decrease in vacant and derelict land
and an increase in declared Local Nature Reserves. Household waste collected has
returned to pre-pandemic levels and the number of complaints received about
airborne nuisance and the occurrences of flytipping have also significantly fallen. 
5.4. Six of the indicators with a ‘good status’ had an ‘unchanged’ trend from the previous
edition. These include the number of various historic and cultural assets in South
Lanarkshire and the return of traffic growth to pre-pandemic levels. The number of
people who have not experienced traffic congestion has remained constant for the
past four years. 
255

Page 256

5.5. None of the indicators with a ‘good’ status show a deteriorating trend compared to
five from the previous Report. This improvement can be attributed to the relaxation of
Covid19 restrictions and recovery from some of its impacts. 
5.6. There are 23 (48.9%) indicators with a ‘fair’ status, eight of which have an improving
trend. These cover a wide range of environmental issues and indicators, including
improvements to our woodlands, greenspace and recreational land. The local
economy is showing signs of recovering from the pandemic and the cost-of-living
crisis and we continue to deliver new homes across all tenures. There have been
significant improvements to local air quality, with no areas in excess of national limits
set to protect human health. Improvements to the quality of our rivers and
watercourses have also been noted.  
5.7. The Report identifies 14 indicators with a ‘fair’ status which have an ‘unchanged’
trend. This is because some environmental issues have stabilised or where there are
limitations on available data. Initiatives such as park and ride improvements and an
increase in concessionary travel have helped to increase an uptake in public
transport but train and passenger numbers have yet to return to pre-pandemic levels.
There has been an increase in poor mental health and poor general health following
the pandemic. Only one indicator is bordering on falling into the ‘poor’ category. This
relates to an increase in complaints about artificial light pollution since the last
Report.  
5.8. Seven (14.9%) of the indicators, based on an assessment of the information
contained in the State of the Environment Report, are judged to be of ‘poor’ status.
Of these, three are ‘improving’. These include a reduction in fuel consumption and
kilometres travelled for personal use but an increase in consumption from
commercial vehicles and, despite various initiatives to improve uptake, active travel
remains poor. 
5.9. Two indicators with a poor status have a trend which is ‘unchanged’. The first of
these relates to the prevalence of early and premature death from cancer, heart
disease and drugs and alcohol. However, the number of deaths from stroke have
reduced. The second is because there has been no significant change in the area of
tree canopy cover or urban canopy cover. 
5.10. There are two indicators with a ‘poor’ status and a deteriorating trend. The first of
these relate to deprivation due to the cost-of-living crisis and the ongoing recovery
from the pandemic, and secondly, the overall condition of peatland remaining poor
and important sites being recorded as ‘unfavourable’. 
5.11. It is not possible to have a direct comparison with the findings in the 2023 Report,
particularly within population and health, due to the indicators review. Of those which
are directly comparable to previous editions, there have been eight changes in
status, principally due to the ongoing recovery from the pandemic. (These are
highlighted in yellow in Appendix 2). For example, reductions in complaints relating
to domestic noise and airborne nuisance, a reduction in traffic emissions and
stabilisation of traffic congestion. 
256

Page 257

5.12. Analysis of the changes from the 2011 Report highlights ‘continuous improvement’ in
seven indicators. These include, greenhouse gas emissions, local air quality,
environmental awareness, and road safety. The trend within eleven indicators has
‘stabilised’, including, outdoor and countryside access, historic and built heritage,
energy consumption and traffic growth. Six indicators have an ‘improving’ trend such
as environmental waste, airborne nuisance and the quality of our rivers and
watercourses. The analysis highlights that no indicators have a deteriorating trend
within the same timeframe. 
5.13. Following Committee approval, the State of the Environment Report will be uploaded
to the Council’s website. It is the intention to develop infographics to relay the key
messages from the Report to the general public. 
6. Employee Implications
6.1. There are no employee implications as a result of this report. 
7. Financial Implications
7.1. There are no financial implications as a result of this report.   
8. Climate Change, Sustainability and Environmental Implications
8.1. The State of the Environment Report is a valuable resource for the Council and
partners in strategic planning. It provides the environmental baseline used in the
Strategic Environmental Assessment of all Council-led plans, policies, programmes
and strategies. Strategic Environmental Assessment helps to safeguard South
Lanarkshire’s natural and built environment and raises awareness of climate change
impacts and directs climate action.   
9. Other Implications
9.1. There are no significant risks or other implications associated with the
recommendations contained in this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
significant change to an existing policy, function or strategy, and therefore, no impact
assessment is required. 
10.2. The draft State of the Environment Report has been subject to internal consultation,
facilitated through the Corporate SEA Working Group. Comments received have
been reviewed, and where appropriate, the Report has been amended. Following
approval by the Executive Committee it is intended to further disseminate the Report
to relevant partners and stakeholders and to make it available to the general public
through the corporate website. It will also be reported to a future meeting of the
Community Planning Partnership Board. 
David Booth
Executive Director (Community and Enterprise Resources) 
7 June 2024  
257

Page 258

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 South Lanarkshire State of the Environment Report 2023
 South Lanarkshire Council Sustainable Development and Climate Change Strategy
2022 - 2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: Jennifer Murphy, Advanced Planning Officer (SEA) 
E-mail: jennifer.murphy@southlanarkshire.gov.uk
258

Page 259

Appendix 1 
Key findings from State of the Environment Report 2023 
Current status: Good
Environmental
Issue Indicator
Status
and
Trend 
Explanation
Biodiversity,
fauna and
flora
Local Nature
Reserves 
The council has augmented the number of
Local Nature Reserves across South
Lanarkshire, with an additional 16 sites
declared within the past two years. Langlands
Moss has also been significantly extended.
Material
assets and
landscape
Vacant and
derelict land 
The area of vacant and derelict land decreased
by 48.5% since 2003 through re-development
and greening, The number of sites also
significantly decreased.
Material
assets and
landscape
Built facilities 
There are a wide range of education,
academia, sport, leisure and cultural facilities
in South Lanarkshire. A review of the number
and use of halls and community centres across
the Council area is ongoing.
Waste
Household
waste
management 
The amount of household waste collected by
the council has returned to pre-pandemic
levels. Waste per household is now at its
lowest level, partly driven by the increase in
the number of households. Household
recycling rates fell in the last financial year to
40.5%. In 2022, recycling rates at Household
Waste and Recycling Centres increased to
69.4%, an increase from 62.5% from the
previous year. Compostable waste materials
collected fell in 2022 compared to 2020.
Waste Environmental
waste 
Street cleanliness in the area continues to
improve and satisfaction levels remain above
the Scottish average. The occurrences of
flytipping have reduced to pre-pandemic levels.
However, there has been a notable increase in
the number of abandoned cars reported to the
council.
Air, noise and
light
Airborne
nuisance 
The number of airborne nuisance complaints
received has decreased significantly over
recent years as in now at the lowest level since
this data was collected. There had been an
increase during lockdowns, particularly related
to garden bonfires and smoke. Garden
bonfires and smoke are the main nuisances
reported to the council.
Water Water
pollution 
Point source pollution remains a threat to the
quality of the water environment. This is closely
monitored by SEPA. It has not been possible
to update this indicator from the previous
Report.
259

Page 260

Environmental
Issue Indicator
Status
and
Trend 
Explanation
Climate
change
Greenhouse
gas emissions 
Carbon emissions continue to decrease in
South Lanarkshire year on year. Emissions per
capita remain below the Scottish average.
Climate
change
Renewable
capacity 
South Lanarkshire’s renewable energy
capacity continues to increase year on year
mainly due to wind energy developments.
There has been a tenfold increase in
renewable energy capacity since 2011. The
area is an energy exporter.
Climate
change
Environmental
awareness 
The council is implementing its new
Sustainable Development and Climate Change
Strategy. Initiatives such as Beat the Street,
Eco-schools and the John Muir Award continue
to help raise environmental awareness in
schools.
Transport Road safety 
The council is making a positive contribution
towards the Scottish Government’s 2030
casualty reduction targets. Data within this
report reflects the reduced volume of traffic
during Covid19 restrictions. The number of
child fatalities as a result of road traffic
collisions has remained at zero for the past
four years.  
Historic and
cultural
heritage
Gardens and
Designed
Landscapes 
The number of Gardens and Designed
Landscapes areas in South Lanarkshire
remains unchanged since 2016.
Historic and
cultural
heritage
Historical
heritage 
The area has a wealth of historic and tourist
attractions, including the New Lanark World
Heritage Site. These continue to attract large
numbers of visitors to South Lanarkshire.
Material
assets and
landscape
Landscape 
The importance of quality landscapes in the
area continues to be recognised and protected
through the local planning process.
Soils Soil quality
and capacity 
Current data indicates good soil quality in a
Scottish or regional context. At present there is
limited data on soil quality specifically within
South Lanarkshire. There has not been a
significant level of development within the
Green Belt.
Transport Traffic growth 
Road traffic growth is returning to pre-
pandemic levels following the relaxation of
Covid19 restrictions.
Transport Congestion 
The number of residents who did not
experience congestion in the area has
remained consistent over recent years 
Improving  No change  Deteriorating 
260

Page 261

Current status: Fair
Environmental
issue Indicator
Status
and
trend 
Explanation
Population
and human
health
Economy 
The area has been impacted from both the
Covid19 pandemic and the cost-of-living
crisis. However, it is evident that progress is
being made towards recovery from recent
challenges.
Biodiversity,
fauna and
flora
Native
woodland 
Although total native woodland cover is
increasing, further work is required to
improve connectivity of habitats, expanding
native broadleaf woodland cover.
Historic and
cultural
heritage
Archaeological
sites 
The number of archaeological sites
recorded across the area continues to
increase year on year, as does the number
of applications approved with archaeological
conditions.
Material
assets and
landscape
Recreational
land 
Investment in greenspace will be informed
by the Open Space Strategy that is under
preparation. The number of community
allotments and plot holders has increased
considerably from previous years.
Material
assets and
landscape
Housing 
A further 3,166 homes have been delivered
since 2021 increasing the number across all
tenures to around 157,657. The Local
Housing Strategy has been renewed.
Air, noise and
light
Local air
quality 
Air quality across South Lanarkshire is
generally good and improving with no areas
in excess of national limits set to protect
human health. Work is ongoing to revoke
the Air Quality Management Area status for
Lanark.
Air, noise and
light Noise 
The number of noise complaints, particularly
residential noise complaints, received by the
council has significantly decreased since the
pandemic lockdown periods. However,
noise complaints about licensed premises
have increased.
Water Water quality 
The number of rivers achieving High/Good
overall status under the Water Framework
Directive (WFD) has increased since the
last Report.
Population
and human
health
Demographic 
The area’s population is growing at a slower
rate than the Scottish average, with the
proportion of older population showing the
greatest increase. However, the population
of people aged less than 25 years is
declining.
Population
and human
health
Morbidity 
Covid19 has impacted on the health and
wellbeing of communities across the area.
There has been an increase in poor mental
health and poor general health.
261

Page 262

Environmental
issue Indicator
Status
and
trend 
Explanation
Biodiversity,
fauna and
flora
Designated
areas 
Not many sites have been surveyed since
the previous report. Although there has
been some isolated improvement, in general
the condition of the designated features
remains similar to previous reports.   
Biodiversity,
fauna and
flora
Ancient
woodland 
There is no change in the area of ancient
semi-natural woodland cover. There is
limited data on the overall condition of this
habitat.
Historic and
cultural
heritage
Built heritage 
There has been minimal change in the
number of designated built heritage features
in South Lanarkshire. The number of
Conservation Areas remain constant.
Material
assets and
landscape
Countryside
and outdoor
access 
There is an extensive path network across
South Lanarkshire. Investment to maintain
and improve the condition and standards of
paths and other access infrastructure is kept
under review.
Material
assets and
landscape
Minerals 
Minerals remain an economically important
resource across South Lanarkshire. Mineral
recycling is being further developed.
Air, noise and
light
Point source
emissions 
Due to the cyber-attack on SEPA, it has not
been possible to update the number of
permits issued for industrial activities in
South Lanarkshire.
Soils Contaminated
land 
Since 2005, 33% of potentially
contaminated sites have been investigated
and remediated under the planning system.
Further progress has not been made since
the last Report.
Water River flow 
The annual water flow rates in the rivers
across the region have remained similar to
previous years with the exception of 2020.
The high level is closely linked to the
increase in annual precipitation rates,
associated with severe weather events.
Water Groundwater
and wetlands 
The number of groundwater bodies with a
good status in South Lanarkshire has
remained the same since the previous
Report. The data available on ponds and
wetlands remains limited.  
Climate
change
Energy
consumption 
Gas and electricity consumption has
significantly decreased compared to the
baseline albeit at a slower rate in recent
years.
Transport Road network
condition 
The condition of the road network remains
similar to previous years, although it
remains better than the Scottish average.
Emerging statistics for 2023/2024 indicate a
deteriorating picture across all categories of
road. 
262

Page 263

Environmental
issue Indicator
Status
and
trend 
Explanation
Transport Public
transport 
The number of park and ride facilities
increased to help facilitate an uptake in
public transport. However, due to Covid19
restrictions, the number of train and bus
passengers significantly reduced. A large
number of residents are using
concessionary bus passes, particularly
secondary school pupils.
Air, noise and
light Light  Complaints about artificial light pollution
have increased over recent years. 
Improving  No change  Deteriorating 
263

Page 264

Current status: Poor
Environmental
issue Indicator
Status
and
trend 
Explanation
Water Flooding 
Severe weather events continue to impact and
have resulted in increased flood incidents in the
area. The council’s approach to flood
management continues to improve.
Climate
change
Transport
emissions 
Fuel consumption and kilometres travelled for
personal vehicles have reduced compared to
pre-pandemic levels, partly due to the increase
in numbers of people working from home.
However, consumption from commercial
vehicles has increased due to the rise in online
retail consumerism. Work continues to promote
the use of electric vehicles.  
Transport Active
travel 
Although the number of people walking and
cycling remains low these remain higher than
pre-pandemic levels. Active travel amongst
school pupils remains constant and the uptake
of cycling continues to improve due to initiatives
in schools such as Bikeability.  
Population
and human
health 
Mortality 
Premature deaths in South Lanarkshire remain
significant across a range of parameters,
particularly cancer, heart disease, alcohol
specific deaths and drugs related deaths. 
However, there has been a reduction in the
number of deaths from stroke.
Biodiversity,
fauna and
flora
Tree
canopy
cover 
There is no significant change in the area of
tree canopy cover or urban tree canopy cover.
Population
and human
health
Deprivation 
The cost-of-living crisis and the ongoing
recovery from the Covid19 pandemic has
exacerbated the need for financial and other
supports across communities.
Soils Peatland 
The overall condition of raised and blanket bogs
across the area is relatively poor with a number
of designated sites recorded as unfavourable. 
Improving  No change  Deteriorating 
264

Page 265

Appendix 2
Changes from 2011 SOE Report
Indicator Status and trend  Comment 2011 2013 2015 2017 2019 2021 2023
Environmental issue: Biodiversity, fauna and flora
Designated
areas        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Ancient
woodland        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Environmental issue: Historic and cultural heritage
Built heritage        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Historical
heritage        Stabilised
Good Good Good Good Good Good Good
Environmental issue: Material assets and landscape
Recreational
land       
Continuous
improvement Fair Fair Fair Fair Fair Fair Fair
Countryside
and outdoor
access       
Stabilised
Fair Fair Fair Fair Fair Fair Fair
Environmental issue: Waste
Household
waste
management       
Improving
Good Good Good Good Good Good Good
Environment
al waste        Improving
Fair Fair Good Good Good Good Good
Environmental issue: Air, noise and light
Local air
quality       
Continuous
improvement Fair Fair Fair Fair Fair Fair Fair
Airborne
nuisance        Improving
Good Good Good Good Good Good Good
Noise        Improving
Poor Fair Fair Fair Fair Fair Fair
Environmental issue: Water
Water quality        Improving
Fair Fair Fair Fair Fair Fair Fair
River flow        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Groundwater
and wetlands        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Flooding        Continuous
improvement
265

Page 266

Indicator Status and trend  Comment 2011 2013 2015 2017 2019 2021 2023
Poor Poor Poor Poor Poor Poor Poor
Environmental issue: Climate change
Greenhouse
gas
emissions       
Continuous
improvement Fair Good Good Good Good Good Good
Energy
consumption        Stabilised
Fair Fair Fair Fair Fair Fair Fair
Traffic
emissions        Improving
Poor Poor Poor Poor Poor Poor Poor
Environment
al awareness       
Continuous
improvement Fair Fair Good Good Good Good Good
Environmental issue: Transport
Road
network
condition       
Stabilised
Fair Fair Fair Fair Fair Fair Fair
Congestion        Stabilised
Good Good Good Good Good Good Good
Traffic
growth        Stabilised
Good Good Good Good Good Good Good
Road safety         Continuous
improvement Good Good Good Good Good Good Good
Active travel        Continuous
improvement Poor Poor Poor Poor Poor Poor Poor 
266

Page 267

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Strategic Environmental Assessment Progress
2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Committee of the progress in carrying out Strategic Environmental
Assessments (SEA) on the Council’s policies, plans, programmes and strategies
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:-
[re]
(1) that the statutory requirement for SEA to inform the development of Council-led
policies, plans, programmes and strategies be noted; and
(2) that progress in conducting SEAs be noted.
[1recs]
3. Background
3.1. The Environmental Assessment (Scotland) Act 2005 requires the Council as a
‘Responsible Authority’ to carry out a Strategic Environmental Assessment of all its
policies, plans, programmes and strategies (plans). 
3.2. The SEA process helps to integrate environmental considerations into the preparation
and adoption of plans. The SEA is carried out in a staged process alongside the
preparation of the proposed plan. Throughout the process, the plan can be adjusted
to mitigate negative, or enhance beneficial environmental effects. 
3.3. SEAs help to promote the Council’s commitment to sustainability and is a key priority
within the Sustainable Development and Climate Change Strategy. SEAs are a
valuable resource in raising the profile of environmental considerations and for
facilitating holistic approaches to address the climate and nature emergencies. 
3.4. The Corporate SEA Working Group continues to meet regularly to oversee the
progression of SEAs across the Council. Its remit also includes development and
mainstreaming of employee knowledge and understanding of the SEA process and
development of the skills needed to undertake assessments. The Group is chaired by
the Planning Officer (SEA).  
14
267

Page 268

3.5. The SEA process is further supported by the publication of the biennial South
Lanarkshire State of the Environment Report which provides the baseline
environmental data. The 2023 edition of this report is being presented to the Executive
Committee for approval alongside this report. Work on the 2025 edition will be
progressed in early 2025. 
3.6. As part of the SEA process, the Council is also required to formally consult with the
statutory Consultation Authorities (Historic Environment Scotland, Scottish
Environment Protection Agency and NatureScot). This is facilitated by the Scottish
Government’s SEA Gateway. 
3.7. In March 2009, the Executive Committee delegated authority to the Chief Executive to
make determinations on whether a Council-led plan is exempt from SEA or if a full
SEA would be carried out. In January 2020, the Chief Executive delegated this
authority to the Executive Director of Community and Enterprise Resources. These
determinations are collated by the SEA Gateway and issued to the statutory
Consultation Authorities for consultation and agreement. This process is facilitated
within the Council by the Planning Officer (SEA). 
3.8. Although it is not a legal requirement to report on SEA progress to Committee, it is
considered good practice to keep members informed.   
4. Progress in Carrying Out SEAs
4.1. The Council has a statutory duty to consider and carry out an SEA for all its policies,
plans, programmes and strategies as they are being developed or refreshed. During
2023/2024, a number of Council-led plans were subject to SEA. 
4.2. The SEA Act requires the Council to assess whether plans are within the scope of the
legislation and whether SEA is required. This can be considered through either Pre-
screening or Screening. 
4.3. Four assessments of plans were completed at the Pre-screening stage. At this stage,
the Council informed the Scottish Government’s SEA Gateway of their opinion that
these plans were exempt from SEA as their implementation would have no or minimal
effect on the environment. These are detailed in Table 1. 
Table 1: Pre-screening completions 2023/2024
Lead Resource Plan
Community and Enterprise Bereavement Services Cemetery
Strategy
Community and Enterprise Social Enterprise Strategy
Housing and Technical Customer Involvement Strategy
Housing and Technical  Anti-Social Behaviour Strategy 
4.4. Three plans were finalised at Screening stage. A formal determination was made and
agreed by the Consultation Authorities that further SEA work was not required for
them. These are detailed in Table 2. 
Table 2: Screening completions 2023/2024
Lead Resource Plan
Community and
Enterprise
Biodiversity Strategy
Community and
Enterprise
Biodiversity Duty Implementation Plan
Housing and Technical Local Heat and Energy Efficiency Strategy
268

Page 269

4.5. During 2023/2024, 2 scoping reports were submitted for consideration by the
Consultation Authorities. These were for the forthcoming Local Transport Strategy and
the revised Management Plan for the New Lanark World Heritage Site. Both of these
Scoping Reports, which set out how the environmental assessment is to be conducted,
were agreed by the Consultation Authorities. Following a comprehensive process, the
assessment methodology for each of these plans were set out in Environmental
Reports and submitted to the SEA Gateway. The assessments of these plans will be
conducted during the current financial year and the findings will be set out in an
Environmental Report. These Environmental Reports will be submitted to the
Consultation Authorities for their consideration and agreement. 
4.6. The final stage of the SEA process is the preparation and submission of a Post
Adoption Statement to the SEA Gateway. The Post Adoption Statement sets out the
key findings from the SEA and how these have been taken account of in the final
adopted plan. In 2023/2024, the Local Housing Strategy was adopted and a Post
Adoption Statement was submitted as statutorily required. 
4.7. In 2024/2025, SEA work will focus on a range of Council-led plans, including the
forthcoming Local Development Plan 3, Open Space Strategy, Air Quality Strategy
and the Tree Strategy. 
4.8. The Strategic Environmental Assessment work continues to promote the protection
and enhancement of the South Lanarkshire environment for our people and
communities. 
5. Employee Implications
5.1. SEAs are resourced by existing staff. 
6. Financial Implications
6.1. SEAs are resourced within existing budgets. 
7. Other Implications
7.1. Failure to make a formal determination in relation to a plan could result in the SEA
process having to be restarted leading to a delay in the development of the plan. 
Council actions in relation to SEA are also open to legal challenge and it is, therefore,
important to ensure compliance with the legislation. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Strategic Environmental Assessment is a valuable tool for the council and partners in
strategic planning. It safeguards South Lanarkshire’s natural and built environment
and is a useful tool to help address both the climate and nature emergencies.   
9.  Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
significant change to an existing policy, function or strategy and, therefore, no impact
assessment is required. The report is for information only and consultation on its
contents is not required. 
David Booth
Executive Director (Community and Enterprise Resources) 
6 June 2024  
269

Page 270

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Executive Committee, 25 March 2009 
List of Background Papers
 South Lanarkshire State of the Environment Report 2021 (approved by Executive
Committee, March 2022)
 South Lanarkshire State of the Environment Report 2023 (report for approval by the
Executive Committee 26 June 2024)
 South Lanarkshire Council Sustainable Development and Climate Change Strategy
2022 - 2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jennifer Murphy
Advanced Planning Officer (Strategic Environmental Assessment)
Email: jennifer.murphy@southlanarkshire.gov.uk
270

Page 271

1 
Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject: South Lanarkshire Local Housing Strategy Annual
Review 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide Executive Committee with an update on the progress made during
2023/2024 against delivering the agreed outcomes set out in the Local Housing
Strategy (LHS) 2022 to 2027 
2. Recommendations
2.1. The Executive Committee is asked to approve the following recommendations:- 
(1) that the progress on actions for delivering the agreed LHS priority outcomes
across the five chapters, be noted. 
3. Background
3.1. The Housing (Scotland) Act 2001 requires local authorities to carry out an
assessment of needs and demand for housing and related services, and to prepare
and submit a five-year Local Housing Strategy (LHS) to Scottish Ministers. The LHS
is the main plan for all housing tenures in the local authority area. 
3.2. The LHS was developed during 2022, building on the good work undertaken by the
Council and its partners under the LHS 2017 to 2022. The LHS works alongside the
Council’s Local Development Plan 2 (LDP2), to set the strategic framework for local
housing development and aligns with corporate and community planning objectives. 
3.3. The LHS was peer reviewed by Scottish Government Policy Teams, the More
Homes Division Area Team, and Fife Council and highlighted several key areas of
strength: engagement and consultation, housing delivery, place making and
communities, and specialist provision, independent living, armed forces, key workers
and Gypsy/Travellers. 
3.4. The peer review also identified a number of areas for improvement including more
information to support people interested in self-build and considering clear actions to
bring non-compliant stock up to energy efficiency standards. 
3.5. The Executive Committee approved the LHS on 30 November 2022 and noted the
annual monitoring and reporting arrangements. This is the first annual review of the
LHS 2022 to 2027. 
15
271

Page 272

2 
4. Context and Wider Policy Changes
4.1. A number of significant changes have taken place both locally and nationally since
the LHS was approved in November 2022. In particular, the housing sector has
faced significant challenges with the Scottish Government, the Chartered Institute of
Housing and a number of local authorities declaring a housing crisis based on sharp
increases in demand for homelessness services and the severe pressure being
placed on housing and wider services. 
4.2. In addition, a range of legislative and budgetary changes implemented nationally
have increased uncertainty around new affordable housing supply and standards. A
summary of these has been set out below:- 
 on 19 December 2023, the Scottish Government announced a significant
reduction in the available national Affordable Housing Supply Programme
budget, with this reduction expected to impact all local authority areas.
Implications to the local supply programme are currently being reviewed, with
increased uncertainty around funding for future years a key factor in the Council
and partners ability to increase supply of affordable homes 
 published in March 2024, the Housing (Scotland) Bill 2024 fulfils the 2023/2024
Programme for Government commitment to bring forward housing legislation. 
The Bill outlines proposals as part of the delivery of their 'New Deal for
Tenants'; continued reform of the rented sector, with some aspects of ‘Housing
to 2040’; and contributing to their ambition to end homelessness in Scotland 
 following a review of the second Energy Efficiency Standard for Social Housing
(EESSH2), the Scottish Government published a consultation in November
2023 on the proposed new Social Housing Net Zero Standard to enable
progress towards net zero and fuel poverty targets.  The new standards will
come into force during the timeframe of the LHS 2022 to 2027, currently
anticipated to be within 2025 
 in November 2023, the Scottish Government launched proposals for the Heat in
Buildings Bill which aims to regulate the way and speed in which Scotland
transitions from carbon-based heating systems to clean heating systems, and in
a way that is affordable, fair and feasible for households, business, services
and the Third Sector. The Bill’s proposals would require changes to the heating
and energy efficiency of most domestic and non-domestic properties across
Scotland 
 in August 2023, the Scottish Government published a consultation document
setting out final proposals for Energy Performance Certificate reform to ensure
the certificates contain the right information to inform decisions that support the
improvement of homes and buildings towards net zero and prohibit the use of
polluting heating systems after 2045 
4.3. Despite this increasing challenge and uncertainty, Housing and Technical Resources
will continue to monitor national and local developments in all areas and ensure that
significant changes are appropriately reflected within the LHS and associated plans
or reports. 
272

Page 273

3 
5. Annual Review 2023/2024
5.1. The LHS is structured around five chapters and eight priority outcomes. There are
107 indicators against which the Council monitors progress including 72 actions and
35 measures. In line with wider reporting arrangements across the Council, these
indicators can be categorised into ‘green’, ‘amber’ and ‘red’ depending on the
progress made against them. Actions can also be recorded as ‘completed’ where
appropriate, or ‘to be reported later’ if they are planned for delivery in a future year of
the Strategy. 
5.2. As at the end of 2023/2024, 60% of the indicators were in line with projected targets
or have been completed. Table 1 outlines the 2023/2024 categorisation of the 107
indicators. 
Completed Green Amber Red To be
reported later Total
3 62 10 3 29 107
Table 1: Categorisation of LHS indicators 2023/2024 
5.3. The review demonstrated good progress has been made for 62 indicators and a
further three have been completed in full.  The higher number of indicators ‘to be
reported later’ reflects that this is the first annual review with a number of actions
scheduled for delivery in future years of the Strategy.  Performance highlights for
2023/2024 are provided in Appendix 1.   
5.4. There were 10 indicators categorised as ‘amber’ within the review, including work to
launch a matching scheme for owners and prospective buyers of empty homes,
paused to await the outcome of a national review, and access rates for Council
properties impacting legislative compliance programmes. Work is currently underway
to ensure progress is made on each of the indicators during 2024/2025. 
5.5. In line with trends across Scotland, South Lanarkshire continues to experience
unprecedented demand for statutory homeless services. Within this, the number of
homelessness presentations in 2023/2024 rose to 2,728, the homelessness case
load at year end rose to 1,579 and the number of homeless households spending
more than 12 months in temporary accommodation rose to 143. 
5.6. Reflecting the severe pressure in relation to homelessness, three measures from
within the Addressing Homelessness chapter have, therefore, been categorised as
‘red’, below anticipated performance:- 
 M6.1 Number of homeless presentations
 M6.2 Level of Homeless Households (homelessness caseload at year end)
 M7.4 Number of homeless households who spend more than 12 months in
temporary accommodation
273

Page 274

4 
5.7. A series of actions to mitigate the impact of the demand for statutory homelessness
services have been reported to Housing and Technical Resources Committee and
Executive Committee and include:- 
 Addressing the significant increase in the number of households in
temporary accommodation by continuing to focus on prevention activities,
ongoing delivery of housing pathway plans for more vulnerable clients and
continuing to prioritise the needs of children within homeless households to
minimise the adverse impact
 Maintaining a sufficient supply of appropriate temporary accommodation
by continuing to monitor the Temporary Accommodation Strategic Plan to
identify and respond to any shortfalls in temporary accommodation provision,
exploring opportunities to increase First Stop and supported accommodation
which would reduce supply of self-contained furnished properties and better
meet service and customer needs, and enter a partnership with Social Bite,
drawing in funding to deliver 15 units of supported accommodation
 Improving access to permanent homes by working towards the increased
Housing Supply target to deliver an increase in stock, taking forward the new-
build programme 
5.8. 29 indicators were identified as ‘to be reported later’ in line with the timescale
identified for implementation within the strategy. Updates will be provided to
Executive Committee on these as part of future annual reviews. 
6. Proposed revisions to LHS Performance Framework
6.1. The annual review provides the opportunity to assess and report on the progress
made against each of the actions and measures contained within the plan. It also
allows for a general re-examination of the LHS to ensure that the objectives, actions,
and measures identified, remain appropriate, relevant, and measurable. 
6.2. During the annual review seven proposed revised actions have been identified.
Details of the proposed changes are detailed in the table below. These revisions will
be incorporated into the LHS action plan for 2024/2025. 
Ref. Current
action/measure
Status Ref. Proposed replacement
action/measure (where appropriate)
A.1.6 Develop and
implement a
‘Housing Options for
Older People’
framework
Green A.1.6 In line with policy developments, the
Housing Options for Older People
framework has developed into the
Progressive Housing Framework, which
was developed jointly within the Health
and Social Care University Partnership
during 2023/2024.   
This action will be amended to now
implement the Progressive Housing
Framework with key partners.
274

Page 275

5 
Ref. Current
action/measure
Status Ref. Proposed replacement
action/measure (where appropriate)
A.2.9 Implement Short
Term Let licensing
scheme and
establish appropriate
services to
implement across
South Lanarkshire.
Blue A.2.9 This has been completed with a fully
operational scheme now in place with the
council’s Legal Services the lead partner,
supported by services across Housing
and Technical Resources and
Community and Enterprise Resources. 
The action will be amended to monitor
the delivery of the new Short Term Let
licensing scheme.
A.3.4 Complete a review
of current council
housing properties
to inform investment
programmes to
achieve EESSH2 for
as many as
practically possible.
Blue N/A A review of the Council’s domestic stock
has been completed, ready to inform
programme of works once the new Social
Housing Net Zero Standard has been
agreed. 
This action will therefore be removed,
with a new action introduced once the
standard has been agreed and
introduced.
A.3.6 Establish
appropriate council
services to provide a
full ECO scheme in
South Lanarkshire to
aid energy efficiency
improvements in
private homes.
Blue A.3.5 Housing and Technical Resources has
fully launched a new ECO Scheme within
2023/24, focusing on supporting
vulnerable households. 
This action will be amended to monitor
the delivery of ECO Scheme in South
Lanarkshire.
A.4.6 Develop and
implement South
Lanarkshire Local
Heat and Energy
Efficiency Strategy
(LHEES) and
associated Delivery
Plan
Green A.4.6 The LHEES and associated Delivery
Plan have been developed with key
partners throughout 2023/2024, with draft
strategy submitted to Executive
Committee on 26 June 2024. 
Subject to approval of the LHEES, this
action will be amended to co-ordinate the
delivery of the LHEES and support
services and partners to implement
projects or actions within it. 
M.6.1 Number of homeless
presentations.
Red M.6.1 This measure will be revised to ‘maintain’
current levels, in line with changes made
to the Rapid Rehousing Transition Plan,
reflecting current pressures within
homelessness services. 
M.6.2 Level of Homeless
Households
(homelessness
caseload at year
end)
Red M.6.2 This measure will be revised to ‘maintain’
current levels, in line with changes made
to the Rapid Rehousing Transition Plan,
reflecting current pressures within
homelessness services. 
275

Page 276

6 
7. Looking ahead
7.1. The delivery of the second full year of the Local Housing Strategy 2022 to 2027 will
continue against the backdrop of the most challenging operational context for
housing and homelessness, both in terms of service demand and lack of clarity over
national standards and funding.  In addition to the indicators being progressed within
the Strategy, the Council and its partners will continue to take forward a wide range
of other work, including: 
 monitoring the progress through the Scottish Parliament of the Housing
(Scotland) Bill 2024, which includes provisions around homelessness
prevention and the private rented sector, submitting evidence to parliamentary
committees where requested to highlight any anticipated impact on the delivery
of the LHS 
 contributing to the revised Strategic Commissioning Plan being developed by
the University Health and Social Care Partnership, ensuring ongoing alignment
with the Local Housing Strategy 2022 to 2027 
 contributing to the development of Local Development Plan 3, ensuring housing
land supply and design of new homes and places reflects the needs and
demands of South Lanarkshire 
 monitoring the outcome of the Scottish Government consultations on proposals
for the Heat in Buildings Bill and the Social Housing Net Zero Standard which
will replace EESSH2 
8. Next Steps
8.1. The review identified that the Council and its housing, health and homelessness
partners have made good progress in 2023/2024 towards delivering on the eight
priority outcomes.
8.2. The Council will continue to monitor, influence where possible and enact any
national policy changes that relate to the Local Housing Strategy 2022 to 2027. 
9. Employee Implications
9.1. There are no employee implications as a result of this report. 
10. Financial Implications
10.1. There are no financial implications as a result of this report. 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
12. Other Implications
12.1. The actions in the LHS link closely to the wider Strategic Commissioning Plan, Local
Development Plan 2, and Climate Change and Sustainability Strategy.   
12.2. A full Strategic Environmental Assessment (SEA) was completed as part of the
development of the LHS 2022-27 with feedback from statutory consultation
authorities incorporated into the Strategy. 
276

Page 277

7 
13. Equality Impact Assessment and Consultation Arrangements
13.1. An Equality Impact Assessment (EQIA) and Fairer Scotland Duty Assessment were
completed as part of the development of the LHS 2022-2027, identifying the
relevance to individuals covered under the “protected characteristics” as defined in
the Equality Act 2010 and the positive impact it could achieve for communities
across South Lanarkshire. 
13.2. The LHS is subject to ongoing consultation and engagement with key partners and
stakeholders through the Local Housing Strategy Steering Group and ongoing links
with tenants and other stakeholders. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
31 May 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Executive Committee Report, ‘Local Housing Strategy (LHS) Annual Review 2021-22’,
3 November 2021
 Executive Committee Report, ‘Local Housing Strategy 2022-27’, 30 November 2022 
List of Background Papers
 Local Housing Strategy 2022-27
 South Lanarkshire Rapid Rehousing Transition Plan 2019-24
 South Lanarkshire Strategic Commissioning Plan 2022-25 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Claire Frew, Strategy Co-ordinator 
E-mail: claire.frew@southlanarkshire.gov.uk
277

Page 278

8 
Appendix 1
Progress Highlights 2023/24 
Key highlights within each of the five chapters of the LHS have been provided below: 
Chapter 1: Housing Supply, Choice and Affordability
• To improve the availability of affordable housing in South Lanarkshire, a total of 269
additional council homes for social rent were delivered in 2023/24. This included 165
homes acquired through the council’s enhanced Market Purchase Scheme and 104
new build homes across Larkhall, Strathaven and Hamilton. A further 144 new build
homes and 33 acquisitions were also completed by Registered Social Landlords
(RSL) in areas of high housing need. 
• Through working with owners of long-term empty homes and partner services, 28
long-term empty homes were successfully supported back into use by the council
during the year, exceeding the annual target of 15.  
• The Progressive Housing Framework has been developed jointly with the Health and
Social Care University Partnership to re-focus operating models with the aim of
promoting independent living and meet people’s needs as their lives and health
circumstances change over time.   
Chapter 2: Housing Quality, Energy Efficiency and Decarbonisation
• In 2023 the council became one of the first local authorities in Scotland to fully launch
a new ‘Energy Company Obligation Scheme’ through existing resources. This scheme
allows national energy company funding to be used by locally based contractors to
make energy efficiency improvements to eligible homes at no cost to the homeowner.
Since launching, 332 energy efficiency measures have been installed in 127
properties, including solar panels, boiler upgrades, and upgrades to insulation.
Through its administrative role, the council are able to direct contractors to particular
household types, with an initial focus on lower income households with very young
children, older people and people with health issues.  
• Despite the uncertainty surrounding new energy efficiency standards for socially
rented homes in Scotland, the council has continued to invest in its housing stock to
ensure tenants benefit from improved energy efficiency within their homes, aiming to
reduce the heat required and associated costs.  
• The council continues to progress new opportunities for district heat networks, with a
feasibility study completed in partnership with Zero Waste Scotland in  2023/24 for
central Hamilton, and discussions underway for a network covering the council’s
domestic premises in the Calderwood area of East Kilbride in line with the proposed
new Local Heat and Energy Efficiency Strategy. 
Chapter 3: Specialist Provision and Supporting Independent Living
• Of the 248 new build council and RSL homes delivered for social rent during
2023/24, 12% are categorised as amenity properties which are wheelchair accessible.
This exceeds the LHS target of 10%. All new homes within the council’s programme
meet the housing for varying needs standard and are ‘future proofed’, meaning they
are designed in such a way that they can be easily adapted to meet the specific needs
of a wide range of customers, now and into the future. 
278

Page 279

9 
• A new Housing Protocol for Care Experienced Young People, jointly delivered by
Housing and Technical Resources and Social Work Resources, was launched in
January 2024.  Funding has been secured from the National Lottery Community Fund
for partnership working between the children’s charity Barnardo’s and Social Work
Resources to deliver youth housing support for Care Experienced Young People to
assist them to transition into settled housing.   
• Throughout 2023/24 the council has continued to invest within the two South
Lanarkshire Gypsy/Traveller sites, with priorities for improvements agreed co-
developed with site residents.  Improvements included a new play area at Shawlands
Crescent, jointly funded by the Scottish Government, alongside the installation of new
security fencing, upgraded CCTV and the commencement of work to improve amenity
blocks.  At the Springbank Park site, pitches have been extended in preparation for
new amenity units to be delivered during 2024/25 with a new play area also being
proposed.   
Chapter 4: Addressing Homelessness
• Despite sustained pressures on homelessness services throughout the year, the
council has achieved a 5% reduction in the average time spent in temporary
accommodation, compared with performance at the end of the previous LHS in 2022.
A further 12 temporary accommodation properties have also been ‘flipped’, allowing
settled homeless households to remain in their property and prevent any further
upheaval. 
• In addition, there has been a 3% increase in both the percentage of all new council
tenancies allocated to homeless households, rising to 62.9%, and the percentage of
homeless households sustaining their tenancy for more than 12 months has risen to
91.2%.
• Through close partnership working new posts have been secured to work with
vulnerable people experiencing homelessness. This includes two part-time Domestic
Abuse Support Worker posts funded by the Alcohol and Drug Partnership to work with
women impacted by substance and alcohol use and homelessness, and one part-time
Support Worker post provided by SAY Women to assist young women aged 16-25
who have experienced sexual abuse, assault or rape and who were homeless or
threatened with homelessness.
Chapter 5: Sustainable Places
• Following successful funding bids to the Linter Trust’s Community Wellbeing Fund and
Connecting Scotland, a further 28 wi-fi enabled devices were provided for tenant use
during 2023/24 through a library-style system. This has significantly upscaled the
scope and reach of digital connectivity for sheltered housing tenants and the service’s
five volunteer digital champions continue to support tenants to access a range of
online services. 
279

Page 280

280

Page 281

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Chief Executive  
Subject: Resource Plans and Connect Reporting 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Committee with the Resource Plans for 2024/2025, for noting,
together with an indication of how the Council Plan, Connect, will be reported in
the 2024/2025 financial year
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[]
(1) that the Resource Plans 2024/2025, prepared in line with the corporate
guidance, be noted; and
(2) that the reporting intention in relation to Connect, summarised at Section 5 of
this report, be noted. 
3. Background
3.1. This report presents the suite of Resource Plans 2024/2025. These plans are
submitted to the relevant Resource Committees for approval and can be accessed at
the following link Plans and progress - South Lanarkshire Council. This report also
provides an indication of how the Council Plan, Connect, will be reported in the
2024/2025 financial year. 
4. Resource Planning Process 2024/2025
4.1. The Resource Plans for 2024/2025 were prepared in line with corporate Resource
Planning guidance and a template. 
4.2. As part of the Resource Planning process, Resources undertake a horizon-scanning
and situational-awareness exercise covering Social Change, Legislation and Policies;
Areas for Improvement, including LGBF, customer views and external inspection
results; and other triggers for action such as top risks. 
4.3. From this exercise, a maximum of ten topics are selected as key areas of focus for
inclusion and development in the Resource Plans. The key areas are shown in table
1 below and are provided to give Committee an overview of the most significant
Resource Plan issues identified for 2024/2025.  
16
281

Page 282

Table 1: Key areas of focus in Resource Plans 2024/2025
CER • Cost of living crisis
• Economic Development and Renewal/Town centre regeneration
• External Funding
• Glasgow City Region City Deal
• Deliver effective employability services to support individuals and
business
• Sustainable Development and Climate Change
• Circular Economy
• Health and Wellbeing
• Legislative and Policy Changes
EDR • Cost of living crisis
• Health and wellbeing for learning
• Equity and Equality
• Curriculum, learning, teaching and assessment
• Digital learning and inclusion
• Climate change and Sustainability
• United Nations Convention on the rights of the child
• Communication and engagement
FCR • Cost of living crisis
• Financial Strategy
• Involving our Communities
• Workforce Planning and People Strategy
• New financial management, HR and Payroll system
• Strategic digital developments
• Sustainable development and climate change
• Continued development of the council transformation programme
HTR • Cost of living crisis
• Housing to 2040
• Financial Considerations
• Severe pressure on Homelessness services
• Continuing to improve the supply and availability of housing
• Provision of Services to Gypsy/Travellers
• Health and Social Care
• Development of Integrated Housing and Property Management System
• Health and Safety
• Sustainable development and climate change
• Refugee re-settlement programme and asylum dispersal
SWR • Challenges and service demand
• Regulation and inspection of services
• Recruitment and retention
• Cost of living crisis
• Children, young people and families
• South Lanarkshire University Health and Social Care Partnership
• Carers Strategy
• Social Work IT system replacement
• National Care Service
• Consultation and engagement 
4.4. The cost of living crisis features as the main challenge in the year ahead in all
Resource Plans. Financial considerations and sustainability and climate change
feature strongly, as does tackling inequalities and achieving equity in the aftermath of
Covid-19. Other topics which feature across a number of Plans include service
transformation and efficiencies, health and wellbeing, and engagement with
communities.  
282

Page 283

5. Resource Plans – Outcomes, Measures and the Link to Connect
5.1. Resources have used the six Connect outcomes to generate their own Resource
outcomes, supported by a range of actions and measures.  Recognising that the
Council continually aims to improve and ensure effective and efficient use of
resources, additional actions and measures have been developed under the heading
Delivering the Plan and achieving Best Value. 
5.2. Table 2 below shows the number of measures from each Resource Plan selected to
be reported against Connect. The figures for 2024/2025 are based on the Resource
Plans for 2024/2025. 
Table 2: Number of measures from Resource Plans selected to be reported
against Connect 
Number of measures 
2022/23 2023/24 2024/25
Community and Enterprise 26 49 53
Education 65 64 44
Finance and Corporate 46 32 37
Housing and Technical 59 68 70
Social Work  38 28 27
TOTAL (Resource Plans) 234 241 231    
Council Plan, Connect 66 70 61 
(Note – 2024/2025 figures correct per Resource Plans as at May 2024; the final
number of measures may vary following internal verifications and cross-checks.) 
5.3. As part of the performance reporting arrangements Connect progress reports will be
presented to the Performance and Review Scrutiny Forum for monitoring at the mid-
year point (Quarter 2) and at the end of the financial year (Quarter 4). 
6. Next steps
6.1. Committee is asked to note the suite of Resource Plans 2024/2025, and that progress
reports will be taken to the appropriate Resource Committees for monitoring at Quarter
2 and Quarter 4. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no direct climate change, sustainability and natural environment implications
arising from this report. 
9.2. The Council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change as
a key area of focus for 2023/2024.  
283

Page 284

10. Other Implications
10.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
11.2. Consultation was undertaken internally with Resources through the annual Resource
Planning process and associated guidance. 
Paul Manning
Chief Executive 
24 May 2024 
Link(s) to Council Values/Outcomes/Priorities
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving 
Previous References
 Draft Resource Plans and Connect Reporting 2023/2024: Executive Committee - 21
June 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk 
284

Page 285

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 26 June 2024
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Amendments to Committee Membership 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of the action taken, in terms of Standing Order No 37(c), due to the
timescales involved, by the Executive Director (Finance and Corporate
Resources), in consultation with the Chair and an ex officio member, to amend
the membership of the Education Appeals Committee. 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the action taken, in terms of Standing Order No 37(c), by the Executive
Director (Finance and Corporate Resources), in consultation with the Chair and
an ex officio member, to replace Councillor Celine Handibode with Councillor
Kirsty Williams as a member of the Education Appeals Committee be noted. 
[1recs]
3. Background
3.1. On 5 June 2024, a request was received from the Business Manager of the Scottish
Labour Party that Councillor Williams replace Councillor Handibode as a member of
the Education Appeals Committee. 
3.2. To facilitate the request and allow the continuation of Council business, in terms of
Standing Order No 37(c) of the Council’s Standing Orders on Procedures, the Chief
Executive, in consultation with the Chair and an ex officio member, approved the
recommendations contained in paragraph 2.1 of the report. 
4. Employee Implications
4.1. There are no employee implications in terms of this report. 
5. Financial Implications
5.1 There are no financial implications in terms of this report. 
6. Climate Change, Sustainability and Environmental Implications
6.1 There are no climate change, sustainability or environmental implications in terms of
this report.  
17
285

Page 286

7 Other Implications
7.1. There are no risk implications in terms of this report. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. There was no requirement to carry out an EIA or formal consultation process. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 June 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elizabeth-Anne McGonigle, Administration Adviser
Tel:  07385403101 
E-mail:  elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
286