Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 13 February 2024 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 21 February 2024
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Lynsey Hamilton, Susan Kerr, Eileen Logan, Katy
Loudon, Hugh Macdonald, Ian McAllan, Catherine McClymont, Kenny McCreary, Lesley McDonald,
Mark McGeever, Davie McLachlan, Richard Nelson, Mo Razzaq, Kirsten Robb, John Ross, David
Shearer, Margaret B Walker 
Substitutes
John Bradley, Walter Brogan, Poppy Corbett, Margaret Cowie, Elise Frame, Celine Handibode,
Graeme Horne, Martin Hose, Ross Lambie, Elaine McDougall, Norman Rae, Graham Scott, David
Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 24 January 2024
submitted for approval as a correct record.  (Copy attached) 
5 - 12 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 1 April to 28 December 2023 and
Probable Outturn
Report dated 18 January 2024 by the Head of Finance (Strategy).  (Copy
attached) 
13 - 18 
4 Capital Budget 2023/2024 and Monitoring for Period 10 - 1 April 2023 to 28
December 2023
Report dated 31 January 2024 by the Head of Finance (Strategy).  (Copy
attached) 
19 - 28 
Item(s) for Decision 
5 Recommendations Referred by Resource Committees
Report dated 7 February 2024 by the Chief Executive.  (Copy attached) 
29 - 36 
6 Hamilton Town Centre Masterplan
Report dated 25 January 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 56 
7 Office Closure - Festive Period 2024
Report dated 31 January 2024 by the Chief Executive.  (Copy attached) 
57 - 58 
8 Council Tax - Second Home Dwellings
Report dated 12 January 2024 by the Chief Executive.  (Copy attached) 
59 - 64 
9 South Lanarkshire Leisure and Culture (SLLC) – Activage Proposals for
2024/2025
Report dated 5 February 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
65 - 72 
10  Former Larkfield Hall and Stonefield Road Pitches, Blantyre – Community
Asset Transfer to Blantyre Soccer Academy
Report dated 8 February 2024 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
73 - 80 
Item(s) for Noting 
11  National Care Service - Update
Report dated 5 February 2024 by the Director, Health and Social Care.  (Copy
attached) 
81 - 84 
Urgent Business 
2

Page 3

12  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Pauline MacRae
Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 24 January 2024 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Margaret Cooper, Councillor Andrea Cowan, Councillor Maureen Devlin,
Councillor Elise Frame (substitute for Councillor Mark Horsham), Councillor Gladys Ferguson-Miller,
Councillor Lynsey Hamilton, Councillor Graeme Horne (substitute for Councillor Hugh Macdonald),
Councillor Susan Kerr (substitute for Councillor Margaret B Walker), Councillor Eileen Logan,
Councillor Katy Loudon, Councillor Ian McAllan, Councillor Catherine McClymont, Councillor Kenny
McCreary, Councillor Lesley McDonald, Councillor Mark McGeever, Councillor Davie McLachlan,
Councillor Richard Nelson, Councillor Mo Razzaq, Councillor Kirsten Robb, Councillor John Ross,
Councillor David Shearer 
Councillors' Apologies:
Councillor Mark Horsham, Councillor Hugh Macdonald, Councillor Margaret B Walker 
Attending:
Chief Executive’s Service
P Manning, Chief Executive
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development; C Park,
Head of Roads, Transportation and Fleet Services
Education Resources
C McKenzie, Executive Director
Finance and Corporate Resources
C Fergusson, Head of Finance (Transactions); T Little, Head of Communications and Strategy; P
MacRae, Administration Adviser; G McCann, Head of Administration and Legal Services; K McLeod,
Administration Assistant; J Taylor, Head of Finance (Strategy)
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
Chair’s Remarks
Prior to the commencement of the business of the meeting, the Chair commended the Council’s
workforce in maintaining vital services during the recent adverse weather conditions. 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s)
Cooper Minutes of Previous Meeting – Item of Urgent
Business – Reduction in Number of Specialist
Palliative Care Beds at Kilbryde Hospice
Member of the Board of
Trustees of Kilbryde
Hospice  
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 22 November 2023 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring for Period 1 April to 1 December 2023 and Probable
Outturn 
A report dated 10 January 2024 by the Chief Executive was submitted on the overall financial
position of the General Fund Revenue Account and the Housing Revenue Account for the period
1 April to 1 December 2023 and the projection for the year to 31 March 2024. 
The report and associated appendices:- 
 summarised the 2023/2024 probable outturn position for the Council’s General Fund
Revenue Account to 31 March 2024, including details of proposed transfers to reserves
 detailed the various 2023/2024 revenue grant redeterminations included in the Local
Government Finance Settlement 2024/2025
 provided details of the position on the General Fund Account and the Housing Revenue
Account respectively for the period 1 April to 1 December 2023
 detailed anticipated spend for the current year
 proposed funds to be transferred to reserves for future commitments 
 detailed the position, after all proposed transfers to reserves, for known commitments
required in the next financial year
 provided the Housing Revenue Account position 
The outturn position, after transfers to reserves, resulted in an underspend of £9.000 million.  This
included proposed transfers to reserves totalling £14.985 million. 
The position for Adults and Older People within Social Work Resources included a £1.272 million
commitment in respect of the element of the budget delegated to the Integration Joint Board (IJB). 
It was proposed that the IJB retain this non-recurring underspend within its reserves earmarked
for future costs.  If approved, those monies would be retained in the Council’s Balance Sheet and
would be available for use by the IJB. 
It was also proposed that, in respect of the £9.000 million underspend, £3.000 million be
transferred to reserves to fund budget pressures in 2024/2025.  It was further proposed that
£6.000 million be transferred to reserves for potential use in the Council’s Budget Strategy in light
of the previously identified savings requirement of £95.8 million across the 4 years from
2024/2025. 
The Local Government Finance Circular 8/2003, published on 21 December 2023, confirmed
previously advised monies for 2023/2024 as well as additional earmarked funding for a number
of Council services.  Details of the new redetermination monies were provided in the report. 
Although not included in the Circular, on the basis that the Council had maintained its teacher
numbers, funding in the amount of £2.934 million for the maintenance of teacher numbers had
been assumed as being received. 
At 1 December 2023, the position on the General Fund Revenue Account, after transfers to
reserves, was an underspend of £0.593 million. 
At 1 December 2023, the Housing Revenue Account showed a breakeven position and the
forecast to 31 March 2024 on the Housing Revenue Account was also a breakeven position.  
6

Page 7

Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that including Resources, Corporate Items and Council Tax, and the proposed transfer to
Reserves, the Council’s outturn underspend of £9.000 million, as detailed in section 4.2 of
the report, be noted; 
(2) that the proposed transfers to reserves totalling £14.985 million, as detailed in section 4.2 of
the report, be approved; 
(3) that approval be given for the non-recurring underspend of £1.272 million in the delegated
budget to the Integration Joint Board (IJB) to be held in reserves for their use in future years,
as detailed in section 4.9 of the report; 
(4) that the proposed use of £3.000 million of the Council’s outturn underspend as a transfer to
Reserves to support budget pressures in 2024/2025, as detailed in section 4.17 of the report,
be approved; 
(5) that the proposed use of the remaining £6.000 million of the Council’s outturn underspend
as a transfer to Reserves, as detailed in section 4.18 of the report, be approved; 
(6) that the redeterminations of 2023/2024 revenue grant funding, as included in the Local
Government Finance Circular 8/2023 and detailed in section 6 of the report, be noted; 
(7) that the underspend of £0.593 million on the General Fund Revenue Account at 1 December
2023, as detailed in section 7.1 of the report, be noted; and 
(8) that the breakeven position on the Housing Revenue Account at 1 December 2023 and the
forecast to 31 March 2024 of breakeven, as detailed in section 8 and Appendix 4 of the
report, be noted. 
[Reference:  Minutes of 22 November 2023 (Paragraph 3)] 
4 Capital Budget 2023/2024 and Monitoring for Period 9 - 1 April to 1 December 2023 
A report dated 10 January 2024 by the Chief Executive was submitted on progress of the General
Fund Capital Programme and the Housing Capital Programme for the period 1 April to 1
December 2023. 
At its meeting on 22 November 2023, the Committee had approved a General Fund Capital
Programme for 2023/2024 totalling £78.901 million.  A revised programme of £71.696 million was
now anticipated which included proposed adjustments to the programme totalling a net decrease
of £1.140 million.  Those were detailed in Appendix 1 of the report.   
In addition to the adjustments detailed in the report, the revised programme of £71.696 million
reflected a transfer to revenue of £1.000 million for the Private Housing Scheme of Assistance
project.  It had been identified that this project, originally in the capital budget, could not be classed
as capital and it was proposed that it be transferred to Housing and Technical Resources’ revenue
budget.  The revised Capital Programme, including the movement from the previous report to the
Committee, was detailed in Appendix 2 of the report.  Appendix 3 detailed the funding available
to support the overall 2023/2024 Capital Programme.  
7

Page 8

Current estimates from Resources suggested an outturn of around £65.4 million.  Against the
revised budget of £71.696 million, this outturn meant a net underspend across Resources of £6.3
million.  This comprised project underspend totalling £8.5 million, offset by projects with
greaterthan anticipated spend of £2.2 million.  A list of the main projects responsible for the
underspend of £6.3 million, and which would now complete in 2024/2025, was provided in
Appendix 4 of the report. 
At 1 December 2023, £31.999 million had been spent on the General Fund Capital Programme,
against a budget for the period of £31.992 million, resulting in spending being slightly ahead of
programme in the sum of £0.007 million.  Actual funding received to 1 December 2023 totalled
£53.928 million.     
The Housing Capital Programme 2023/2024, approved by the Executive Committee at its meeting
on 22 November 2023, totalled £67.443 million.  Programmed funding for the year also totalled
£67.443 million and details of the position of the programme at 1 December 2023 were provided
in Appendix 5 of the report. 
At 1 December 2023, the budget for the Housing Capital Programme amounted to £33.315 million. 
Expenditure for the period totalled £33.973 million and actual funding received to 1 December
2023 also amounted to £33.973 million. 
There followed a discussion during which:- 
 officers responded to members’ questions on various aspects of the report
 concern was expressed regarding removal by the Scottish Government of capital funding to
Strathclyde Partnership for Transport (SPT) and the impact on Council projects as a result 
The Committee decided: 
(1) that the adjustments to the General Fund Programme, detailed at Appendix 1, be approved; 
(2) that the period 9 position at 1 December 2023 of the General Fund Capital Programme, as
detailed in appendices 2 to 4, and the Housing Capital Programme, detailed at Appendix 5,
be noted; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference:  Minutes of 22 November 2023 (Paragraph 4)] 
5 Additional Funding from Scottish Government and Other External Sources 
A report dated 5 January 2024 by the Chief Executive was submitted on additional funding,
totalling £24.003 million, which had been made available to the Council by the Scottish
Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2023/2024 
(£m) 
Education 1.134 
Various 22.592 
Total 23.726  
8

Page 9

Capital Funding 
Resource 2023/2024 
(£m) 
Community and Enterprise 0.095 
General 0.182 
Total 0.277 
Overall Total 24.003 
The Committee decided: that the report be noted. 
[Reference: Minutes of 22 November 2023 (Paragraph 5)] 
6 Recommendations Referred by the Finance and Corporate Resources Committee
- Non-Domestic Rates - Empty Property Relief Policy 
A report dated 3 January 2024 by the Chief Executive was submitted on a recommendation which
had been referred to this Committee by the Finance and Corporate Resources Committee of 6
December 2023. 
The recommendation of the Finance and Corporate Resources Committee was that the revised
Empty Property Relief (EPR) Policy be approved and adopted by the Council from 1 April 2024. 
The Committee decided: that the revised EPR Policy, to be adopted by the Council
from 1 April 2024, as outlined at section 5 of the report and
detailed in Appendix 3 to the report, be approved. 
[Reference: Minutes of Finance and Corporate Resources Committee of 6 December 2023
(Paragraph 10)] 
7 Land and Property Transfers and Disposals 
A report dated 15 December 2023 by the Executive Director (Housing and Technical Resources)
was submitted on proposed actions in respect of land and property transactions. 
The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
The Committee decided: 
(1) that the land and property, as detailed in Appendix A of the report, be transferred between
Resources; and 
(2) that the land detailed in Appendix B of the report be declared surplus to Council
requirements. 
8 Update on the Budget Strategy for 2024/2025 
A report dated 9 January 2024 by the Chief Executive was submitted providing an update on the
budget position for 2024/2025, including the impact of the Local Government Settlement.  
9

Page 10

At its meeting on 22 November 2023, the Committee approved a budget strategy resulting in a
revised budget gap of £20.7 million.  Subsequently, on 21 December 2023, the Council received
its grant settlement for Revenue and Capital (the Local Government Settlement) which would
impact on the Budget Strategy for 2024/2025. 
The report provided an updated position and focused on:- 
 a recap of the 2024/2025 revenue budget update report, submitted to the Committee on 22
November 2023
 the impact of the Local Government Settlement on the Revenue Budget Strategy
 Council Tax
 the impact of the Local Government Settlement on the General Capital Grant position
 the 2023/2024 probable outturn position 
Taking account of the impact of the Local Government Settlement, including the change to the
rates poundage as detailed in the report, the original Budget Gap of £20.7 million had been revised
to £21.070 million.  The impact of the Other Budget issues detailed in the report resulted in a
benefit to the Budget Gap of £0.500 million, revising the Budget Gap to £20.570 million.  After the
Settlement and the savings proposals were taken into account, there was a residual shortfall and
Budget Gap of £2.001 million. 
A national allocation of £144 million had been advised to allow for a Council Tax freeze and, while
there was no indication of this within the Settlement, the Council’s indicative share of this sum
was £7.7 million.  Any allocation of those monies would be conditional on the Council approving
a Council Tax freeze. 
The Council’s allocation of General Capital Grant for 2024/2025 represented a cut of £1.931
million (9.1%) on the 2023/2024 allocation.  The Council also benefited from Government monies
received by other bodies such as Strathclyde Partnership for Transport (SPT) and Clyde Gateway,
however, the Settlement announced in December also included reductions in the allocations from
the Scottish Government to those bodies. 
The legal deadline for setting the Council budget was 11 March 2024 and details of the critical
dates and dates for issuing Council Tax and rent bills were outlined in the report. 
The position would continue to be monitored and reported to members as appropriate. 
There followed a discussion during which:- 
 officers responded to members’ questions
 members expressed disappointment that, despite assurances to the contrary, the General
Capital Grant allocation showed a reduction of 9.1% on the previous year’s allocation 
The Committee decided: 
(1) that the update to the Budget Strategy, including the update on the Settlement for the
Council, resulting in a revised Budget Gap of £20.570 million, as detailed in section 5.11 of
the report, be noted; 
(2) that the position in relation to Council Tax, as detailed in section 6 of the report, be noted; 
(3) that the update in relation to Capital Grant allocations for 2024/2025, as detailed in section
7 of the report, be noted; 
(4) that the summary of the Council’s 2023/2024 Probable Outturn, as detailed in section 8 of
the report, be noted; and  
10

Page 11

(5) that the timetable, as detailed in section 10 of the report, be noted. 
9 Commercial Opportunities 
A report dated 8 January 2024 by the Executive Director (Community and Enterprise Resources)
was submitted on the work undertaken to explore commercial opportunities for the Council. 
The medium-term position in relation to the Council’s budget meant that it required to consider
commercial opportunities to generate income.  Regulations were in place, however, which placed
restrictions on the Council in terms of investing in commercial opportunities purely for financial
gain.  This could be managed if the investments could be linked to economic/regeneration
outcomes. 
Details of the opportunities considered in relation to the following were outlined in the report:- 
 town centre regeneration including the Civic Centre, East Kilbride, East Kilbride Shopping
Centre and Hamilton Town Centre
 inward investment
 renewable energy 
Officers were exploring other opportunities and those would be brought to future meetings of the
Executive Committee for consideration. 
The Committee decided: that the work undertaken to explore commercial
opportunities be noted. 
10 Representation on Outside Bodies - Clydesdale Citizens' Advice Bureau 
A report dated 11 February 2021 by the Chief Executive was submitted on the action taken, in
terms of Standing Order No 37(c), due to the timescales involved, by the Chief Executive, in
consultation with the Chair and ex officio member, to appoint Councillor McClymont as the
Council’s representative on Clydesdale Citizens’ Advice Bureau. 
The Committee decided: that the action taken, in terms of Standing Order 37(c), due
to the timescales involved, by the Chief Executive, in
consultation with the Chair and ex officio member, to appoint
Councillor McClymont as the Council’s representative on
Clydesdale Citizens’ Advice Bureau, be noted. 
11 Urgent Business 
There were no items of urgent business. 
12 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraphs 6 and 8 of Part I
of Schedule 7A of the Act. 
11

Page 12

13 Capital Budget 2023/2024 - Exception for Greenhills Road Capital Project 
A report dated 24 January 2024 by the Chief Executive was submitted on a proposed exception
for the Glasgow City Region Deal project at Greenhills Road, East Kilbride. 
During the project, various delays had been experienced and unforeseen costs had been incurred,
including significant costs related to the COVID-19 pandemic.  Those had impacted on the overall
project cost and details were outlined in the report. 
Such events were termed “compensation events” and were usually largely unforeseen and not
the fault of the contractor.  The Council was obliged to pay for agreed compensation events and
agreement in principle had been reached on a settlement figure in respect of the Greenhills Road
project.  Details were given on the settlement figure and how the additional funding requirement
could be met.  The proposal would require a Change Control Request to be submitted to the City
Deal Cabinet for approval. 
The Committee decided: that the adjustment to the 2023/2024 General Fund Capital
Programme for the Greenhills Road project, East Kilbride,
be approved subject to approval of the Change Control
Request from Glasgow City Region Cabinet. 
12

Page 13

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 21 February 2024
Report by: Head of Finance (Strategy)  
Subject: Revenue Budget Monitoring for Period 01 April to 28
December 2023 and Probable Outturn 
1. Purpose of Report
1.1. The purpose of the report is to:
[purpose]
 advise the Committee on the overall financial position of the Council’s General
Fund Revenue Account and Housing Revenue Account for the period 1 April
2023 to 28 December 2023, and a projection for the year to 31 March 2024. 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):
[recs]
(1) that the Council’s breakeven probable outturn position after Transfers to
Reserves (section 4.1), be noted;
(2) that the underspend of £1.509 million on the General Fund Revenue Account
at 28 December 2023 (section 5.1), be noted; and
(3) that the breakeven position on the Housing Revenue Account at 28 December
2023, and the forecast to 31 March 2024 of breakeven (sections 6.1 and 6.2),
be noted. 
3. Background
3.1. This report will summarise the previously reported Probable Outturn position for the
Council’s General Fund Revenue Account to 31 March 2024 (section 4).  Sections 5
and 6 provide the position on the General Fund Account and the Housing Revenue
Account for the current period 1 April 2023 to 28 December 2023, respectively. 
4. 2023/2024 General Services Probable Outturn 
4.1. As reported previously, the 2023/2024 probable outturn position for the General Fund
presented an underspend of £9.000 million.  This underspend was after proposed
Transfers to Reserves totalling £14.985 million.  It was proposed that the £9.000
million probable outturn underspend be transferred to Reserves with £3.000 million
being set aside to support budget pressures in 2024/2025 and the remaining £6.000
million be considered to support the Council’s Budget Strategy, including pay.   
4.2. Full details of the Transfers to Reserves were included in the 24 January 2024 report
to the Executive Committee.  The forecast position before and after Transfers to
Reserves is shown in Appendices 1 and 2.  The position presented in Appendix 2
includes the probable outturn underspend of £9.000 million as a Transfer to Reserves
resulting in a breakeven position for the Council’s 2023/2024 Probable Outturn. 
3
13

Page 14

4.3. Teacher Numbers:  As previously reported, the Cabinet Secretary had held back
£45.5 million of funding nationally for the maintenance of Teacher Numbers, until after
the 2023 Census details are received by the Government, and until councils provide
assurance that they have maintained teacher numbers and pupil support numbers at
the 2022 level.  For the Council, this amounts to £2.934 million.  The release of these
monies was not confirmed in the recent Finance Circular, however, on the basis that
the Council has maintained its Teacher Numbers, the amount of £2.934 million has
been assumed as being received.  There has been no update on this position at the
time of writing. 
5. 2023/2024 General Services Monitoring Position  
5.1. Financial Position as at 28 December 2023:   As at 28 December 2023, the position
on the General Services budget is a net underspend of £1.509 million, after Transfers
to Reserves.  This is shown in Appendix 2 with the position before Transfers to
Reserves in Appendix 1 for information. 
5.2. This position is in line with the forecast position for the General Fund (section 4). 
6. Housing Revenue Account Position
6.1. Financial Position as at 28 December 2023:  Appendix 3 of the report shows a
breakeven position against the phased budget on the Housing Revenue Account. 
6.2. Probable Outturn Position:  Appendix 3 also shows the forecast position for the
financial year, being a breakeven position for the Housing Revenue Account.   
6.3. This breakeven position includes a lower than budgeted Transfer from Reserves being
required in the financial year.  It is assumed that the increased level of costs
experienced will be offset by an underspend in Loan Charges this financial year.   
6.4. The reduction in Loan Charges is anticipated in 2023/2024 as a result of utilising an
in-year benefit from the Housing Revenue Account Loans Fund Review.  This work
has been carried out and forms part of the 2024/2025 budget setting report for the
HRA to this Committee (Housing Revenue and Capital Account Budget 2024/2025). 
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend. As detailed in section 4, inflationary and budget pressures this year
increase the risk of overspend however we have mitigated this going forwards through
providing additional funds in future years budget strategy, and through the one-off use
of reserves in the current year.   
10.2. We will also continue to monitor the actual impact through four weekly Budget
Monitoring Meetings at which any variance is analysed. In addition, the Probable
Outturn information included in this report ensures early warning for corrective action
to be taken where appropriate.
14

Page 15

11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required.   
11.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
18 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 28 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Lorraine O'Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk  
15

Page 16

Appendix 1
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report (BEFORE Transfers)
Period Ended 28 December 2023 (No.10)
Committee
Annual
Budget
Annual
Forecast
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Budget
Proportion
To 28/12/23
Actual
to
Period 10
28/12/23
Variance
to
28/12/23
Departments: £m £m £m £m £m £m
Community and Enterprise Resources 139.295 139.055 0.240 98.548 98.367 0.181 under
Facilities, Waste and Grounds 83.216 82.889 0.327 55.544 54.991 0.553 under
Leisure and Culture Services 23.227 23.044 0.183 22.433 22.290 0.143 under
Planning and Regulatory Services 5.382 5.018 0.364 4.063 3.899 0.164 under
Enterprise and Sustainable Development 5.973 5.664 0.309 2.934 2.698 0.236 under
Roads, Transportation and Fleet 21.497 22.440 (0.943) 13.574 14.489 (0.915) over
Education Resources 439.709 440.004 (0.295) 313.603 313.791 (0.188) over
Education 439.709 440.004 (0.295) 313.603 313.791 (0.188) over
Finance and Corporate Resources 44.104 44.320 (0.216) 41.196 41.375 (0.179) over
Finance Services - Strategy 2.306 2.272 0.034 2.670 2.619 0.051 under
Finance Services - Transactions 19.450 19.631 (0.181) 15.080 15.165 (0.085) over
Audit and Compliance Services 0.411 0.417 (0.006) 0.446 0.467 (0.021) over
Information Technology Services 5.542 5.542 0.000 8.390 8.455 (0.065) over
Communications and Strategy Services 2.966 2.966 0.000 2.428 2.428 0.000 -
Administration and Licensing Services 4.510 4.730 (0.220) 3.878 4.004 (0.126) over
Personnel Services 8.919 8.762 0.157 8.304 8.237 0.067 under
Housing and Technical Resources 17.592 16.082 1.510 23.944 23.944 0.000 -
Housing Services 10.229 8.673 1.556 8.730 8.670 0.060 under
Property Services 7.363 7.409 (0.046) 15.214 15.274 (0.060) over
Social Work Resources 239.322 239.322 0.000 158.173 158.173 0.000 -
Performance and Support Services 6.686 6.501 0.185 4.704 4.455 0.249 under
Children and Families 48.943 49.233 (0.290) 35.974 36.340 (0.366) over
Adults and Older People 182.252 182.252 0.000 115.961 115.961 0.000 -
Justice and Substance Misuse 1.441 1.336 0.105 1.534 1.417 0.117 under
Joint Boards 2.053 2.053 0.000 1.579 1.579 0.000 -
882.075 880.836 1.239 637.043 637.229 (0.186) over
Committee
Annual
Budget
Annual
Forecast
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Budget
Proportion
To 28/12/23
Actual
to
Period 10
28/12/23
Variance
to
28/12/23
£m £m £m £m £m £m
Service Departments Total 882.075 880.836 1.239 637.043 637.229 (0.186) over
CFCR 0.038 0.038 0.000 0.000 0.000 0.000 -
Loan Charges 38.796 29.340 9.456 0.000 0.000 0.000 -
Corporate Items (5.093) (12.127) 7.034 0.326 (1.369) 1.695 under
Investments – 2023/24 (T/f to Reserves) 2.994 0.000 2.994 0.000 0.000 0.000 -
2023/2024 Probable Outturn Underspend
(T/f to Reserves) 0.000 0.000 0.000 0.000 0.000 0.000 -
Total Expenditure 918.810 898.087 20.723 637.369 635.860 1.509 under
Council Tax 179.102 182.394 3.292 137.771 137.771 0.000 -
Less: Council Tax Reduction Scheme (23.278) (23.308) (0.030) (17.906) (17.906) 0.000 -
Net Council Tax 155.824 159.086 3.262 119.865 119.865 0.000 -
General Revenue Grant 350.757 350.757 0.000 269.813 269.813 0.000 -
Non-Domestic Rates 341.536 341.536 0.000 262.720 262.720 0.000 -
Transfer from Reserves 70.693 70.693 0.000 70.693 70.693 0.000 -
Total Income 918.810 922.072 3.262 723.091 723.091 0.000 -
Net Expenditure / (Income) 0.000 (23.985) 23.985 (85.722) (87.231) 1.509 under
16

Page 17

Appendix 2
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report (AFTER Transfers)
Period Ended 28 December 2023 (No.10)
Committee
Annual
Budget
Annual
Forecast
AFTER
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
To 28/12/23
Actual
to
Period 10
28/12/23
Variance
to
28/12/23
Departments: £m £m £m £m £m £m
Community and Enterprise Resources 139.295 139.295 0.000 98.548 98.367 0.181 under
Facilities, Waste and Grounds 83.216 82.889 0.327 55.544 54.991 0.553 under
Leisure and Culture Services 23.227 23.244 (0.017) 22.433 22.290 0.143 under
Planning and Regulatory Services 5.382 5.018 0.364 4.063 3.899 0.164 under
Enterprise and Sustainable Development 5.973 5.664 0.309 2.934 2.698 0.236 under
Roads, Transportation and Fleet 21.497 22.480 (0.983) 13.574 14.489 (0.915) over
Education Resources 439.709 440.004 (0.295) 313.603 313.791 (0.188) over
Education 439.709 440.004 (0.295) 313.603 313.791 (0.188) over
Finance and Corporate Resources 44.104 44.320 (0.216) 41.196 41.375 (0.179) over
Finance Services - Strategy 2.306 2.272 0.034 2.670 2.619 0.051 under
Finance Services - Transactions 19.450 19.631 (0.181) 15.080 15.165 (0.085) over
Audit and Compliance Services 0.411 0.417 (0.006) 0.446 0.467 (0.021) over
Information Technology Services 5.542 5.542 0.000 8.390 8.455 (0.065) over
Communications and Strategy Services 2.966 2.966 0.000 2.428 2.428 0.000 -
Administration and Licensing Services 4.510 4.730 (0.220) 3.878 4.004 (0.126) over
Personnel Services 8.919 8.762 0.157 8.304 8.237 0.067 under
Housing and Technical Resources 17.592 17.592 0.000 23.944 23.944 0.000 -
Housing Services 10.229 10.158 0.071 8.730 8.670 0.060 under
Property Services 7.363 7.434 (0.071) 15.214 15.274 (0.060) over
Social Work Resources 239.322 239.322 0.000 158.173 158.173 0.000 -
Performance and Support Services 6.686 6.501 0.185 4.704 4.455 0.249 under
Children and Families 48.943 49.233 (0.290) 35.974 36.340 (0.366) over
Adults and Older People 182.252 182.252 0.000 115.961 115.961 0.000 -
Justice and Substance Misuse 1.441 1.336 0.105 1.534 1.417 0.117 under
Joint Boards 2.053 2.053 0.000 1.579 1.579 0.000 -
882.075 882.586 (0.511) 637.043 637.229 (0.186) over
Committee
Annual
Budget
Annual
Forecast
AFTER
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
To 28/12/23
Actual
to
Period 10
28/12/23
Variance
to
28/12/23
£m £m £m £m £m £m
Service Departments Total 882.075 882.586 (0.511) 637.043 637.229 (0.186) over
CFCR 0.038 0.038 0.000 0.000 0.000 0.000 -
Loan Charges 38.796 38.598 0.198 0.000 0.000 0.000 -
Corporate Items (5.093) (11.144) 6.051 0.326 (1.369) 1.695 under
Investments – 2023/24 (T/f to Reserves) 2.994 2.994 0.000 0.000 0.000 0.000 -
2023/204 Probable Outturn Underspend
(T/f to Reserves) 0.000 9.000 (9.000) 0.000 0.000 0.000 -
Total Expenditure 918.810 922.072 (3.262) 637.369 635.860 1.509 under
Council Tax 179.102 182.394 3.292 137.771 137.771 0.000 over
Less: Council Tax Reduction Scheme (23.278) (23.308) (0.030) (17.906) (17.906) 0.000 over
Net Council Tax 155.824 159.086 3.262 119.865 119.865 0.000 -
General Revenue Grant 350.757 350.757 0.000 269.813 269.813 0.000 -
Non-Domestic Rates 341.536 341.536 0.000 262.720 262.720 0.000 -
Transfer from Reserves 70.693 70.693 0.000 70.693 70.693 0.000 -
Total Income 918.810 922.072 3.262 723.091 723.091 0.000 -
Net Expenditure / (Income) 0.000 0.000 0.000 (85.722) (87.231) 1.509 under
17

Page 18

Appendix 3 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Period Ended 28 December 2023 (No.10) 
Housing Revenue Account 
Annual
Budget 
Forecast 
for Year 
Annual
Forecast
Variance 
Budget
Proportion
to 28/12/23
Actual
to Period 10
28/12/23
Variance
to
28/12/23 
% Note 
£m £m £m  £m £m £m   
Employee Costs 15.310  15.401  (0.091)  11.167  11.236  (0.069) over (0.6%) 
Property Costs 50.929  56.610  (5.681)  32.177  36.583  (4.406) over (13.7%) 1
Supplies & Services 0.653  0.691  (0.038)  0.512  0.526  (0.014) over (2.7%) 
Transport & Plant 0.196  0.189  0.007   0.111  0.103  0.008  under 7.2% 
Administration Costs 5.570  5.597  (0.027)  0.385  0.401  (0.016) over (4.2%) 
Payments to Other Bodies 2.974  2.979  (0.005)  1.545  1.551  (0.006) over (0.4%) 
Payments to Contractors 0.100  0.145  (0.045)  0.064  0.064  0.000   - 0.0% 
Transfer Payments 0.000  0.000  0.000   0.000  0.000 0.000 - 0.0% 
Financing Charges 27.162  27.162  0.000   25.167  25,167  0.000   - 0.0% 
Total Controllable Expenditure 102.894  108.774  (5.880)  71.128  75.631  (4.503) over (6.3%) 
Total Controllable Income (115.940) (116.768) 0.828   (79.757) (80.164) 0.407  over
recovered 0.5% 2
Transfer to/(from) Balance Sheet (4.907) (0.853) (4.054)  (3.118) (0.749) (2.369) under
recovered (76.0%) 3
Net Controllable Expenditure (17.953) (8.846) (9.107)  (11.747) (5.282) (6.456) over (55.0%) 
Add: Non Controllable Budgets       
Financing Charges 17.953  8.846  9.107   6.495 0.030 6.456  under (99.5%) 
Total Budget 0.000 0.000 0.000  (5.252) (5.252) 0.000  - 0.0% 
Variance Explanations
1. The net overspend reflects the volume and cost of repairs and maintenance, including additional costs for the internal contractor. There is also an overspend in relation
to cleaning charges.
2. The additional income is due to the favourable timing of new build and purchased council housing units being available to rent.
3. The timing impact of the net overspend requires a higher than budgeted transfer from reserves at this time. 
Virements
None. 
18

Page 19

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 21 February 2024
Report by: Head of Finance (Strategy) 
Subject: Capital Budget 2023/2024 and Monitoring for Period 10
- 1 April 2023 to 28 December 2023 
1. Purpose of Report
1.1. The purpose of the report is to: 
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2023 to
28 December 2023  
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):  
(1) that the adjustment to the General Fund programme, listed at Appendix 1, be
noted; and  
(2) that the period 10 position (ended 28 December 2023) of the General Fund
Capital Programme detailed in Appendices 1 to 4 and the Housing Capital
Programme at Appendix 5, be noted; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 28 December 2023.  Spending has been split into two separate sections: 
 General Fund Capital Programme including Education, Social Work, Roads and
Transportation and General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme 
4.1. 2023/2024 Budget:  The budget agreed at Executive Committee on 24 January 2024
was £71.696 million.  A revised programme of £78.296 million is now anticipated, an
increase of £6.600 million from the previously reported position.   
4.2. This revised programme of £78.296 million reflects an adjustment to the programme,
which was approved by the Executive Committee on 24 January, as part of a separate
report on the Glasgow City Region City Deal project at Greenhills Road, East Kilbride.  
The details of this adjustment are included in Appendix 1.   
4
19

Page 20

4.3. The revised Programme, including the movement from the last report, is detailed in
Appendix 2. 
4.4. Programmed funding for the year also totals £78.296 million.  The funding available to
support the overall 2023/2024 Capital Programme is detailed in Appendix 3.     
4.5. 2023/2024 Outturn:  As reported last period, estimates from Resources suggest an
outturn of around £72 million.  Against the revised budget of £78.296 million, this
outturn means a net underspend across Resources of £6.3 million.  This is made up
of project underspends totalling £8.5 million offset by projects with greater than
anticipated spend of £2.2 million.   
4.6. The majority of the variance is due to the timing of spend, resulting in budget required
in 2024/2025 rather than 2023/2024.  Funding for projects remaining underspend at
the financial year-end will be carried forward to allow the projects to be completed in
2024/2025.   
4.7. These underspends have been partially offset by a few projects where there are
budget overspends predicted this financial year.  For these projects, again, this is a
timing issue only with funding for the overall spend already identified into the next
financial year.   
4.8. A list of the main projects which are responsible for the underspend of £6.3 million, as
detailed in section 4.5, and which will now complete in 2024/2025 is included in
Appendix 4, along with their anticipated completion dates.   
4.9. General Fund – Period 10 Position:  As noted in section 4.1, the total capital
spending programme for the year is £78.296 million.   
4.10. Appendix 3 shows budget for the period of £34.777 million and spend to the 28
December 2023 of £34.088 million.  The spend is, therefore, behind programme by
£0.689 million and this mainly reflects the timing of spend on a number of projects. 
4.11. Within Community and Enterprise Resources, recharges for works completed to date
on the Roads Carriageway Programme (£0.284m) have still to be processed.   
4.12. Within Education Resources, spend on the First Steps Community Nursery Extension,
Hamilton (£0.199 million) and the Wooddean Early Learning Centre, Bothwell (£0.328
million) is behind schedule due to delays experienced in the programmes of work. 
These have been offset by adaptation works at Uddingston Grammar School (£0.443
million), where the funding requirement for this project had originally been anticipated
for 2024/2025. 
4.13. Finally, spend on the Prioritised Urgent Investment Programme (£0.305 million) within
Housing and Technical Resources, is demand led and less than anticipated at this
time. 
4.14. Actual funding received to 1 December 2023 is £63.166 million.  This is also detailed
in Appendix 3. 
4.15. Relevant officers will continue to closely monitor the generation of all income.  
20

Page 21

5. Housing Capital Programme
5.1. 2023/24 Budget:  Appendix 5 summarises the position on the Housing programme as
at 28 December 2023.  The revised capital programme for the year is £67.443 million,
as approved by the Executive Committee on 24 January 2023. 
5.2. Programmed funding for the year also totals £67.443 million.  The funding sources are
detailed in Appendix 5. 
5.3. 2023/2024 Outturn:  Current estimates from Housing and Technical Resources
suggest an outturn of £67.443 million.  Progress on the Housing Capital Programme
will continue to be monitored and updates will be provided to future meetings of this
Committee. 
5.4. Period 10 Position:  Budget for the period is £40.985 million and spend to 28
December 2023 amounts to £41.276 million.  This results in the Housing Programme
being £0.291 million ahead of programme.  This is due to the number of buy backs,
through the open market purchase scheme, which have been progressed earlier than
anticipated.   
5.5. As at 1 December 2023, £41.276 million of funding had been received. 
5.5 Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. There are no employee implications as a result of this report.  
7. Financial Implications
7.1. The General Services and Housing Programmes and their spend position to 28
December 2023 are detailed in sections 4 and 5 respectively. 
7.2. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to this Committee. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report.
21

Page 22

Jackie Taylor
Head of Finance (Strategy) 
31 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 24 January 2024 
List of Background Papers
 Capital Ledger prints to 28 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
22

Page 23

Appendix 1 
Previously Approved Adjustments  
Community and Enterprise Resources 
Glasgow City Region City Deal - Greenhills Road
At its meeting on 24 January 2024, the Executive Committee approved a separate
report on the Glasgow City Region City Deal project at Greenhills Road, East Kilbride. 
The report advised that work is concluding around final costs on the project. 
As a result of additional costs incurred by the contractor, the majority of which are as 
a result of COVID-19 and wider global events (e.g. supply chain and cost of 
materials), the current budget requires to be increased by £6.600 million to reach a 
settlement with the contractor. 
As this is a Glasgow City Region City Deal project, funding from within the overall City 
Deal allocation for the Council can be identified to cover £4.3 million of these costs.  
This will be a virement from other unspent City Deal project budgets that are not 
required.    
The balance of funds required (£2.3 million) can be met from monies held in reserves 
in relation to developer contributions for roads related projects.  Council funds had 
been used to deliver these road projects, therefore, the developer contributions held 
in reserves are now available to contribute to costs of Greenhills Road. 
£4.300m 
£2.300m
TOTAL ADJUSTMENTS £6.600m 
23

Page 24

Appendix 2
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 28 DECEMBER 2023 
£m  
Total Budget - Approved by Executive Committee, 24 January 2024 71.696  
Approved Adjustments – Greenhills Road – Appendix 1
(separate report to Executive Committee, 24 January 2024)
6.600  
Total Revised Budget 78.296     
2023/24
Budget 
Period 10
Approved
Adjustments 
Revised
2023/24
Budget
Resource £m £m £m    
Community & Enterprise 38.577 6.600 45.177
Education 14.268 - 14.268
Finance & Corporate 5.333 - 5.333
Housing & Technical 11.488 - 11.488
Social Work 2.030 - 2.030
Other Match Funding - - -    
TOTAL CAPITAL PROGRAMME 71.696 6.600 78.296      
24

Page 25

Appendix 3
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2023/24       
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 28 DECEMBER 2023 
2023/24
Original
Estimate inc
C/F 
2023/24
Revised
Budget 
2023/24
Budget to
28/12/23 
2023/24
Actual to
28/12/23     
Expenditure £m £m £m £m     
General Fund Programme 77.849 78.296 34.777 34.088 
Income
2023/24
Budget
2023/24
Revised
Budget 
2023/24
Actual
To
28/12/23         
£m         £m  £m
Prudential Borrowing 32.075  30.106  30.106
Developers Contributions 0.542 3.219  2.270
Partners (Including SPT, Clyde Windfarm
and Transport Scotland)
2.157 3.764  0.680
Scottish Government:     
- Capital Grant 33.985 29.947  22.718 
- Cycling, Walking and Safer
Routes
1.632 2.284  0.704
- Road Safety Improvement 0.000 0.475  0.000 
- Vacant and Derelict Land 2.019 1.519  1.519 
- Regeneration Capital Grant  0.737 1.225  0.745 
- Place Based Investment
Programme
1.510 2.723  2.723
-Inspiring School Age Childcare
Spaces Programme
0.000 0.234  0.000
Glasgow City Region City Deal 0.000 0.000  0.000
Capital Receipts 2.000 1.340  0.241
Specific Reserves 1.192 1.422  1.422
Revenue Contribution 0.000 0.038  0.038     
TOTAL FUNDING 77.849 78.296  63.166 
25

Page 26

Appendix 4
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/24
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 28 DECEMBER 2023 
Projects with Anticipated Underspends in 2023/2024, which will carry forward into
2024/2025
Project Name Project Type Completion Date   
Community and Enterprise
Resources  
Phillipshill Cemetery - Extension Infrastructure May 2024
Play Parks - Various Infrastructure Throughout 2024/25 and
beyond
White Bridge Replacement,
Chatelherault Country Park - Design 
Infrastructure April 2024
Larkhall Leisure Centre - Design New Build January 2025
TACT Hall – Heating Replacement Refurbishment May 2024
Priory Changing Pavilion, Blantyre Refurbishment September 2024
Rural Development Centre - Lanark New Build September 2024
2023/2024 Place Based Investment
Programme - Various
Regeneration September 2024
Vacant & Derelict Land - Cuningar
Allotments
Regeneration May 2024
City Deal Community Growth Areas -
Woodfoot Road / Wellhall Road,
Hamilton
Infrastructure March 2025
Lanark Interchange Infrastructure July 2024   
Education Resources  
Woodside Primary School -
Adaptations
Adaptations August 2024
Uddingston Nursery Expansion Adaptations August 2024
Crawforddyke Primary School - Toilet
Adaptations
Adaptations April 2024
Wooddean Early Learning Centre
(formerly Clyde Terrace Nursery)  
New Build April 2024
Free School Meals Expansion Adaptations Throughout 2024/25 and
beyond
Education ICT (current contract) Infrastructure  October 2024   
Finance and Corporate Resources  
IT Infrastructure Infrastructure Throughout 2024/25   
Housing and Technical Resources   
Prioritised Urgent Investment Refurbishment Throughout 2024/25
Lifecycle Replacement Schools Refurbishment Throughout 2024/25
Communities Facilities Fund Refurbishment Throughout 2024/25
Council Offices – Brandon Gate Adaptations June 2024
CEEF 2023/24 Programme Refurbishment June 2024
26

Page 27

Appendix 5
SOUTH LANARKSHIRE COUNCIL           
CAPITAL EXPENDITURE 2023/24
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2023 TO 28 DECEMBER 2023 
2023/24
Original 
Budget  
2023/24
Revised
Budget
2023/24
Budget to
28/12/23
2023/24 
Actual to
28/12/23 
£m £m £m £m
Expenditure 
2023/24 Budget  63.916  67.443  40.985  41.276     
2023/24
Original 
Budget  
2023/24
Revised
Budget 
2023/24
Actual to
28/12/23 
£m £m  £m
Income         
Capital Receipts 0.000 1.683  1.905
Capital Receipts – Land Sales 0.000 0.000  0.018
Capital Funded from Current Revenue 27.162 27.162  25.162
Prudential Borrowing 17.302 23.166  6.217
Scottish Government Specific Grant:    
- New Build 16.632 10.048  7.843
- Open Market Purchase Scheme 2.700 5.264  0.000
- Mortgage to Rent 0.120 0.120  0.131 
63.916 67.443  41.276 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Executive Committee 
Date of Meeting: 21 February 2024
Report by: Chief Executive  
Subject: Recommendations Referred by Resource Committees 
1. Purpose of Report
1.1. The purpose of the report is to request approval of the undernoted recommendations
referred to this Committee by the:-
[1purpose]
 Community and Enterprise Resources Committee at its meeting held on 6
February 2024
 Housing and Technical Resources Committee at its meeting on 7 February
2024 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the proposed amendments to the Renewable Energy Fund (REF) criteria
be approved; 
(2) that the rent increase of 6.50% to be applied in 2024/2025 with a further 6.50%
increase in 2025/2026 and again in 2026/2027 subject to annual review and
customer engagement for all Council houses, Gypsy/Traveller sites, lockups
and garage sites and the revenue estimate proposals for the HRA, as detailed
in Appendix 1 of the report to the Housing and Technical Resources
Committee, be endorsed and referred to Council for approval; 
(3) that the findings of the HRA Loans Fund Review, as detailed in Section 4 of the
report to the Housing and Technical Resources Committee, be endorsed for
implementation and referred to Council for approval; and 
(4) that based on the rent increase of 6.50%, the 2024/2025 Housing Capital
Programme of £77.303 million, as detailed in Appendix 2 to the report to the
Housing and Technical Resources Committee, be endorsed and referred to
Council for approval.
[1recs]
3. Background
3.1 Recommendation Referred by Community and Enterprise Resources
Committee of 6 February 2024 – Renewable Energy Fund - Strengthening
Links to Rural Priorities – Extract of Minute   
A report dated 22 December 2023 by the Executive Director (Community and
Enterprise Resources) was submitted outlining proposed changes to the Renewable
Energy Fund (REF). 
5
29

Page 30

Since 2004, the Council had collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service.  The Service was
responsible for securing contributions from windfarm developers, advising potential
applicants, assessing applications and the monitoring of projects to ensure that the
community benefits associated with each project were delivered.  Processes were
reviewed continuously to ensure best practice in grant provision and monitoring was
undertaken to ensure the necessary support was delivered to eligible communities. 
The Council administered the Community Benefit element of REF for 42 windfarms
within South Lanarkshire as well as the Community Benefit for Clyde Windfarm Fund
(CWFF).  Between the various funds, £3,111,584 of income was received in
2022/2023 which was split between REF (£2,020,682) and CWFF (£1,090,902). 
The funds, as currently administered, covered a range of programmes which were
detailed at paragraph 3.3 of the report.  Over the last 15 years, £10 million had been
awarded and invested within communities closest to the windfarms with each £1 of
grant generating on average £3 of additional funding.  Over the 15 years, over 500
grants had been awarded and, of those, over 110 had been grants of over £20,000. 
The overall themes of the REF complemented both Council and community plans. 
Those themes are detailed below and a comprehensive list of investment priorities
for each theme was provided in Appendix 2 to the report:- 
 build stronger communities
 build prosperous communities
 develop healthy and active communities
 create sustainable and environmental communities 
The number of windfarms, scale and community benefit income generated was
increasing.  The income had approximately doubled in 5 years to an estimated £2.5
million in 2023/2024.  This allowed a review on how the funds could best support
local communities and the strategic outcomes from the funds.  There were several
reasons to consider if the Community Benefit funds were delivering the maximum
benefit to rural communities and those were detailed in paragraph 4.1 of the report. 
The annual income from windfarm community benefits varied between communities
and within wards, dependent on scale and proximity of windfarms, but was
concentrated on 6 rural wards which formed the Rural Task Force.  Some wards
within East Kilbride and Larkhall also had access to the REF.  All wards in the
Council area were eligible for microgrants.  The table at paragraph 4.2 of the report
summarised the annual income available for rural wards, and selected communities,
at the higher and lower range.   
Additionally, some communities in wards 3 and 4 were eligible for funding from the
CWFF which was administered by the Council, however, eligibility and funding
decisions were made by a community panel and advised by SSE Renewables.  The
proposed REF changes did not extend to the CWFF. 
Through the work of the rural Community Led Local Development Programme
(CLLD), funded by the Scottish Government, and community engagement, such as
the Rural Conference in March 2023, several strategic priorities had been identified
which were not fully addressed via REF.  Those priorities were as follows in order of
community importance:- 
 transport and connectivity
30

Page 31

 recreation and community facilities
 rural entrepreneurial activity and business infrastructure
 jobs, training and employability
 environmental and net zero sustainability
 rural poverty and wellbeing
 tourist and visitor infrastructure to support tourism 
It was proposed that the criteria for REF grants be amended to align and deliver on
the challenges and to provide increased benefit for communities. The proposed
amendments were outlined at paragraph 4.7 of the report and as detailed below:- 
 an ability to fund revenue projects in addition to capital projects
 increase the small grants level to 100%, funding up to £20,000
 increase the large grants maximum grant to 75% and, in specific areas and with
conditions, up to 100% grants would be available
 introduce a Rural Facilities Sustainability Fund to help communities consider
asset ownership and retain facilities for a period of up to 3 years
 in consultation with communities, Community and Enterprise Resources would
develop larger, more complex community projects on behalf of local
communities and local needs 
Further details and a comparison of changes were provided in Appendix 1 to the
report.  The proposed changes had been developed following consultation with the
Council’s Rural Task Force on 15 November 2023.  Discussions had also taken
place with the rural Community Planning Partnership (CPP), third sector interface
and windfarm operators. 
The proposed changes, if endorsed, would be referred to the next meeting of the
Executive Committee for approval.  Thereafter, application decisions would be made
under the revised criteria.  The changes would allow communities more scope to
develop local initiatives and projects while reducing the Council’s involvement and
funding. 
The Economic Development Manager (Funding and Rural) responded to a member’s
question in relation to windfarm operators and revenue funding. 
The Committee decided: 
(1) that the key challenges for the rural area, as identified in paragraph 4.6, be
noted; and 
(2) that the proposed amendments to the REF criteria, as set out in paragraph 4.7,
be endorsed. 
The Committee
recommended to the
Executive
Committee:
that the proposed amendments to the REF criteria
be approved. 
[Reference: Minutes of 30 October 2018 (Paragraph 6) and Minutes of the
Executive Committee of 31 March 2004 (Paragraph 12), 1 December
2010 (Paragraph 9) and 21 November 2018 (Paragraph 4)] 
3.2. A link to the report submitted to the Community and Enterprise Resources
Committee of 6 February 2024 is provided for information
31

Page 32

3.3. Recommendations Referred by Housing and Technical Resources Committee
of 7 February 2024 – Housing Revenue and Capital Account Budget 2024/2025
– Extract of Minute   
A joint report dated 12 January 2024 by the Chief Executive and the Executive
Director (Housing and Technical Resources) was submitted on:- 
 the revenue estimate proposals for the Housing Revenue Account (HRA) for
2024/2025 which had been prepared in line with the 30-year Business Plan
 the 2024/2025 Housing Capital Programme totalling £77.303 million 
The HRA revenue budget for 2024/2025 had been prepared in line with the 30-year
HRA Business Plan, developed to reflect the investment priority to maintain and
improve the housing stock to meet national housing quality and energy efficiency
standards.  The programme also included projects to increase the supply of Council
housing as well as environmental works and legislative compliance programmes, to
ensure that all safety requirement standards were met. 
The movement, as compared to the existing 2023/2024 revenue budget, was
outlined in Appendix 1 to the report.  The movements were summarised in the report. 
The 2024/2025 budget proposal also included a provision of £3.743 million for bad
debt which would be required to continue to provide for the potential impact on rent
collection and arrears.  This included contingency for the ongoing uncertainty on
rental collections in the coming year due to cost-of-living pressures and an allocation
of £0.300 million for tenancy sustainment mitigation. 
During previous budget engagement, tenants had favoured multi-year agreements
on the basis that they would have some clarity regarding rent levels in the medium
term.  A rent increase of 6.50% was proposed from 2024/2025 with a further 6.50%
increase in 2025/2026 and again in 2026/2027.  In accordance with statutory
requirements, this 3-year commitment would be subject to annual review and
customer engagement.  This approach would allow the Council and tenants to plan
and budget on a longer-term basis.  To achieve this level of rent increase, a re-
profiling of the long-term investment priorities had been undertaken.  Short-term
investment priorities and current service levels would be maintained. 
A recently published Scottish Government draft budget for 2024/2025 included the
reduction in funding available for the Affordable Housing Supply Programme.  The
2024/2025 budget represented a decrease of 22% on the previous published figure
for 2024/2025 and it was still unclear how the Scottish Government would reduce
individual Councils’ funding.  Further discussions were planned with the More Homes
Team at the Scottish Government for further clarity on the situation.  Any reduction in
Scottish Government grant available for the Council could impact the planned
investment to increase the overall supply of Council housing.  An update would be
provided to the Committee when information on the impact for the Council, which
might affect the 2024/2025 and future years capital programmes, was available. 
Based on the latest Scottish Social Housing Charter returns, the average rent
charges for South Lanarkshire Council tenants remained affordable and were
currently the seventh lowest of local authority landlords in Scotland.  In addition,
South Lanarkshire Council tenants’ rent charges were the lowest of all the social
landlords operating in South Lanarkshire. 
32

Page 33

In line with the HRA Business Plan, a reduction of £0.300 million for efficiencies had
been included within the Resource’s Supervision and Management and Other
Income budgets.  £0.100 million of the efficiencies did not affect the delivery of
services to tenants and related to the removal of vacant posts from the current
establishment.  The remaining £0.200 million was anticipated to come from
standardising charges for washing and drying facilities across all Council areas
which had been approved by this Committee on 8 November 2023. 
At the Executive Committee on 24 June 2020, the Council approved the
implementation of the findings from the Loans Fund Review which included work by
Link Asset Services to analyse the impact on the HRA loans fund principal
repayments if a Loans Fund Review for the HRA was implemented.  This work was
refreshed at the end of March 2023 and further details of the Loans Fund Review
were provided in the report.  Implementing the Loans Fund Review meant looking at
the repayment terms of loans and the lifespan of the related assets. 
As at 31 March 2023, outstanding Loans Fund Advances for the HRA totalled
£292.694 million.  However, by applying the Loans Fund Review, the Loans Fund
Advances as at 31 March 2023 would have been £407.126 million, which meant that
the accounting for repaying debt resulted in an overpayment of £114.432 million. 
This was referred to as a recalculation adjustment which was detailed in table 1 of
the report. 
It was proposed that the recalculation adjustment be applied over the financial years
2023/2024 to 2025/2026 to reduce the HRA repayments in those years by £22.000
million, compared to current repayment profile. 
How the benefits of the Loans Fund Review would be utilised were detailed in the
report as well as information on additional debt repayments. 
Details of the proposed Housing Capital Programme, totalling £77.303 million, were
provided in Appendix 3 to the report and information on how the Programme would
be funded was summarised in the report. 
The Budget Scrutiny Group (BSG) provided the main consultation process between
the Council and tenant representatives.  Each year, the Council and the BSG worked
together to develop and co-ordinate the consultation programme on setting Council
rent levels for the year ahead. 
This year’s consultation programme followed a similar approach to previous years
and included the Tenant Participation Co-ordination Group (TPCG).  A summary of
the feedback received from the BSG and TPCG was detailed in the report as well as
feedback received from various engagement events and an online survey. 
Officers responded to members’ questions on various aspects of the report. 
The Committee recommended to the Executive Committee: 
(1) that the rent increase of 6.50% to be applied in 2024/2025 with a further 6.50%
increase in 2025/2026 and again in 2026/2027 subject to annual review and
customer engagement for all Council houses, Gypsy/Traveller sites, lockups
and garage sites and the revenue estimate proposals for the HRA, as detailed
in Appendix 1 to the report, be endorsed; 
33

Page 34

(2) that the findings of the HRA Loans Fund Review, as detailed in Section 4 of the
report, be endorsed for implementation; and 
(3) that based on the rent increase of 6.50%, the 2024/2025 Housing Capital
Programme of £77.303 million, as detailed in Appendix 2 to the report, be
endorsed. 
3.4. A link to the report submitted to the Housing and Technical Resources Committee of
7 February 2024 is provided for information.  
4. Employee Implications
4.1. Any employee implications have been raised in the original reports to the relevant
Committees. 
5. Financial Implications
5.1. All financial implications have been highlighted as part of the original reports to the
relevant Committees. 
6 Climate Change, Sustainability and Environmental Implications
6.1 Any implications for climate change, sustainability or the environment have been
highlighted as part of the original reports to the relevant Committees. 
7. Other Implications
7.1. Any further implications have been highlighted as part of the original reports to the
relevant Committees. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. No equality impact assessments are required in terms of the proposals contained
within this report. 
8.2. Consultation arrangements have been highlighted as part of the original reports to
the relevant Committees. 
Paul Manning
Chief Executive 
7 February 2024 
Link(s) to Council Values/Priorities /Outcomes
 Fair, open and sustainable
 Accountable, effective, efficient and transparent 
Previous References
 Community and Enterprise Resources Committee 6 February 2024
 Housing and Technical Resources Committee 7 February 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
34

Page 35

Pauline MacRae, Administration Adviser
Ext:  4108  (Tel:  01698 454108)
E-mail:  pauline.macrae@southlanarkshire.gov.uk
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 21 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Hamilton Town Centre Masterplan 
1.  Purpose of Report
1.1. The purpose of the report is to:- 
 update Committee on the work undertaken to prepare a masterplan for Hamilton
Town Centre
 seek Committee approval of the Hamilton Town Centre masterplan as the basis
for the future strategic approach to investment 
2.  Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) to note the work undertaken in the preparation of the masterplan;
(2) to note that the masterplan sets the strategic approach for the future of Hamilton
Town Centre and informs the investment and policy position of the Council
moving forward;
(3) to agree that officers are authorised to progress the relevant statutory and legal
processes within the context of the masterplan set out in Appendix 1; and 
(4) to agree that further reports are provided to relevant committees in due course
setting out the delivery structure, funding model and programme of activity. 
3.  Background
3.1.  Like most town centres across the UK, Hamilton has seen a change in customer
behaviour over the past 20 years. The continued growth of online shopping, mobility
of customers and move towards “click and collect” has changed retailers’ requirements
with less demand in business models for town centre locations. 
3.2. Online retail has grown steadily over the past decade, peaking at 37% in January 2021
and settling to around 26% mid 2023. Traditional retailers have struggled to compete
with major online retailers. Further, the current cost of living crisis has put even more
pressure on town centres. 
3.3. Middle market towns (towns outside the UK’s top 50 that are looking to serve more
than a convenience shopping purpose) have been particularly vulnerable to retail’s
evolutionary change. Spend in these towns has been eroded due to changing
shopping habits. Retailers, particularly in the fashion sectors, have been ruthless in
such locations, closing stores or moving them to nil rent/ turnover rents where
landlords are flexible enough to offer such terms. 
3.4.  Hamilton is ranked 48th out of 200 centres within the UK (1 being the lowest and 200
being the highest) for overall retail performance. This measure does not accurately
6
37

Page 38

depict the dynamics across the whole town and is, in reality, skewed by the strength
of the out-of-town provision. The town essentially has three constituent parts with
Hamilton Retail Park and the Palace Grounds area thriving at the expense of the
traditional town centre. There is simply too much retail space within Hamilton for the
current provision to operate effectively. Further, the size and configuration of retail
units within the traditional town centre no longer meet retailer requirements. At the
current level, there will always be a significant amount of vacancy and the quality of
operators will gradually reduce as landlords take any offers to keep space occupied. 
3.5. Hamilton is a town centre with strong assets and a definable place quality. This is
evident though the strong civic presence, business base, historical architecture, and
investment to date. These provide the foundations for Hamilton to reassert its role as
a strong and vibrant town centre. Recognition of the change in retail requirements
allows focus on other key aspects of the town centre including leisure and cultural
offering, services, and town centre living. The town has been steadily expanding over
recent years and has an ever-increasing population base which can support a multi-
functional town centre. As one of Lanarkshire’s largest towns, Hamilton is well placed
to provide a variety of functions to a large catchment area. 
3.6. The current commercial backdrop has generated the need to review a number of
prominent town centre sites as a whole and create a masterplan which meets the
needs of today and tomorrow.  The challenges facing Hamilton Town Centre were
presented to this committee on 29 August 2023 and approval was granted to begin
the masterplan process. 
4.  Hamilton Town Centre Masterplan Process
4.1.  The process has involved an intense period of activity over the last 6 months with a
series of workshops with external consultants along with officers from across the
Council. These sessions have been led by Community and Enterprise Resources with
support from officers from Housing and Technical Resources.   
4.2. The vision for the town centre is to repurpose underperforming areas into high quality,
high-density, mixed-use developments which the residents of Hamilton can be proud
of. This is an opportunity for innovative place-making solutions which will attract
developer interest. The vision and framework produced has identified where
investment will have the greatest benefit and demonstrate the ambition for the town
centre to the community and investors. It sets the context for public and private sector
investment over the next 15+ years. The masterplan reflects aspirations for a resilient,
mixed-use economy which repositions the centre to meet the needs of 21st century
living in a high quality and sustainable manner. 
4.3 . Key components of the masterplan exercise are as follows:- 
 Analysis of Market Potential – Specialist market advice and potential
developer/investor interests have been sought. 
 Analysis of Council Strategies – consideration has been given to existing Council
Strategies including the Local Development Plan, Economic Strategy, Local
Transport Strategy, Housing Strategy, the Strategic Housing Investment
Programme, Waste Strategy and the ongoing South Lanarkshire Leisure and
Culture Asset Review.  
38

Page 39

 Land-Use Strategy – a successful and thriving town centre requires a range of
land uses including:- 
- Retail
- Leisure
- ‘Town Centre Living’ which can support the Council’s Strategic Housing
Investment Plan as well as the Council’s Affordable Housing Supply
Programme.
- Civic and community uses
- Public Realm/ Green Network; and 
- Transport Infrastructure including car parking 
 Demolition and Site Clearance - A programme of demolition is likely due to the
volume of retail space within the town centre. This could take place in advance
of securing sale/disposal to facilitate investment. 
 Neighbouring Uses - The masterplan must be mindful of how it connects to
neighbouring areas and communities and seeks to optimise the functionality of
the town centre as a whole. 
 Sustainable Place-Making/Urban Design - Consideration has been given to the
sustainability of future development including opportunities for district heating or
other sustainable technologies. 
 Creation of a Development Prospectus - A high-quality development prospectus
will be produced to share the vision with potential partners and investors and
inform investment decisions. 
4.4. The development of the masterplan is a unique opportunity to deliver transformational
change to the town centre. The plan will reduce the centre’s reliance on retail and
introduce new uses allowing Quarry Street to be the focus for smaller independent
shops, cafes and restaurants.  The masterplan is detailed and complex bringing
together a range of solutions which balance the ambitions of the community with the
challenging commercial environment. A summary of the masterplan is attached at
Appendix 1 and illustrates the changes proposed to the centre. These proposals are
ambitious, however, without significant intervention, the town centre will continue to
decline.  The strategic interventions are outlined below. 
5.  Key Interventions
5.1. The Regent Shopping Centre 
With the loss of key anchors such as Marks and Spencer and Wilkos and with many
other tenants coming to the end of their lease, the Regent Shopping Centre currently
has a vacancy rates of 38% and is unlikely to regain full occupancy in the current retail
climate. The centre is on the market and its owners welcome the masterplan as an
opportunity to enhance the attractiveness of the asset in the market. The centre is held
under a ground lease from the Council. 
5.2. The masterplan proposes to create a development site for town centre living. This
approach is consistent with that being proposed across the country for similarly
challenged centres, including Paisley, Clydebank, Falkirk, Buchanan Galleries and
East Kilbride. Every effort would be made to relocate existing tenants and retain them
within the town. There is an option to retrofit the former Marks and Spencer store for
office accommodation. The options for retrofit of this building versus demolition will be
further explored.  The wider site has the potential to create new residential blocks
39

Page 40

incorporating family housing, later living, some commercial ground floor uses,
amenities and car parking. There is the potential to provide around 350 new homes
with approximately 20% earmarked for social housing. This would reduce the retail
floorspace by up to 70%, create an attractive new neighbourhood for the town and
support remaining retail in the town centre. It should be noted that development in this
area also includes the Townhead Street and Keith Street car parks which are owned
by the Council.   
5.3. Former Bairds Building 
This building was purchased by Wetherspoons in early 2020 to be converted into one
of its pubs. The current economic climate has brought changes to Wetherspoons
business model who have now confirmed they no longer intend to proceed with the
proposals and the building is now on the market.  While private sector development
would be the preferred option, the building is a prominent feature of the town centre,
therefore, the masterplan has considered options for this site including retrofit of the
building, demolition and redevelopment as well as ‘meanwhile uses’ for the site which
include use as an event and market space while development is progressed. 
5.4. Duke Street Car Park 
This car park is currently underutilised and in need of repair. The masterplan shows
student or hotel accommodation on this site alongside new parking provision. An
active travel corridor to the station is also proposed.   
5.5. New Cross Shopping Centre
The previous owners of the New Cross Shopping Centre went into liquidation in 2021
which resulted in the centre being handed back to the Council as the ground landlord.
The previous owners had not kept maintenance of the centre up to date and, as a
result, it has a variety of maintenance issues and increasing vacancy rates making it
commercially unviable as a retail site. The masterplan shows residential led
redevelopment with active ground floor uses along the line of Chapel Street which
mirrors the layout prior to the centre’s development. There is the potential to make use
of basement service areas for car parking for any redevelopment but the viability of
this will be ascertained through the next stages of design development. 
5.6. The site also has the potential to also accommodate a range of civic uses moving
forward.  Residential units could also extend to the site of Hamilton Police HQ (Police
Scotland have indicated that they may wish to vacate this site). These two sites can
provide around 80 new homes.   
5.7. Former Vogue Building 
This building was due to be developed by Clyde Valley Housing Association (CVHA)
for social housing, however, CVHA has recently withdrawn from the project due to
concerns over viability and financial pressures across their wider estate. The
masterplan proposes developing this site with a flexible multipurpose building, most
likely for a leisure purposes whilst retaining the building façade. 
5.8. Hamilton Town Square 
This site is the main pedestrian route between the Palace Grounds and the traditional
town centre. It is a vast space which is underutilised and has never fulfilled the
potential of use originally intended. The introduction of commercial “pods” will add
interest to the area and encourage footfall. Further, the masterplan shows the
introduction of more greening which increases the attractiveness of the area. Greening
measures have been proven to increase customer dwell time in town centres.  
40

Page 41

5.9. Quarry Street 
No significant interventions have been proposed for Quarry Street. This part of the
town is covered by the conservation area and many of the buildings are listed. Major
redevelopment is, therefore, not possible. The street will continue to serve its function
as a traditional town centre high street. The reduction in retail in other parts of the town
centre will allow Quarry Street to strengthen its role as a shopping thoroughfare
supporting independent shops, cafes and restaurants.   
5.10. Proposals to reintroduce traffic to Quarry Street in a trial basis from February 2024
and improve the environment through greening and street furniture will reinforce its
role as a local centre supporting a range of local businesses for an increased local
catchment. 
6.  Next Steps and Timescales
6.1. As noted above, the masterplan is intended to set the strategic priorities and
investment for the town centre over the next 15+ years. 
6.2. Following completion and approval of the masterplan, a delivery structure and
programme of activity will be finalised. Officers have considered the broad principles
of how each element can be delivered and an appropriate funding model. It should be
noted, however, that this report seeks strategic intent for the masterplan as a basis to
move forward only. A separate report will be brought to Committee in due course
setting out the details of a delivery structure and programme of activity. 
6.3. It is anticipated that the delivery of the masterplan in its entirety will take 15+ years,
however, early intervention will be identified to act as a catalyst to further change and
investment. 
7.  Member and Community Engagement
7.1. Briefing sessions have been given to Hamilton Elected Members, MSPs and MPs.   
7.2. Presentation of the masterplan to the wider community, tenants and town centre
stakeholders including Hamilton BID will take place in March with council officers and
members of the design team in attendance to answer questions over a three-week
period. Consultation materials will also be available online for six weeks. 
8.  Employee Implications
8.1.  There are no employee implications as a result of the proposals set out in this report.
The development and implementation of the masterplan will be led by officers within
Enterprise and Sustainable Development Services in consultation officers across
Planning, Roads, Property, Housing, Legal, Finance and Procurement Services. 
9.  Financial Implications
9.1.  The costs for the Council in preparing the masterplan are being funded through the
Place Based Investment Programme and were approved at the 30 May 2023 meeting
of the Community and Enterprise Committee. 
9.2.  Future investment by the Council in the town centre will be subject to a Full Business
Case, funding availability and separate committee approvals. 
9.3.  The masterplan is intended to support future external funding bids. All external funding
opportunities will be explored. 
41

Page 42

10. Climate Change, Sustainability and Environmental Implications
10.1.  The masterplan has sustainability at the forefront and projects will be taken forward in
line with the Council’s sustainability objectives. 
11.  Other Implications
11.1. The risks associated with not supporting the masterplan is that Hamilton Town Centre
will continue to decline if no action is taken. This will result in a process of managed
decline rather than investment for growth. 
11.2.  The Council could face reputational damage if it is not seen to actively support and
encourage investment in the town centre. 
11.3.  Redevelopment of the town centre allows the Council to respond to the demands for
both affordable housing and the continued demand for private sector housing. 
12.  Quality Impact Assessment and Consultation Arrangements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Impact
Assessment is required.  
12.2. Consultations have been undertaken by Economic and Sustainable Development
Services with a range of other Council services who have an ongoing role in town
centres. This consultation and cooperation will continue throughout the duration of the
initiative.  Community consultation will commence in March 2024.   
David Booth
Executive Director (Community and Enterprise Resources) 
25 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 We will work towards a sustainable future in sustainable places 
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Hamilton Town Centre Strategy and Action Plan – Community and Enterprise
Resources Committee – 30 October 2018
 Town Centre and Place Based Investment Programme Update - Community and
 Enterprise Resources Committee – 30 May 2023
 Hamilton Town Centre Masterplan - Community and Enterprise Resources Committee
29 August 2023 
List of background papers 
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Victoria Eccles, Enterprise and Sustainable Development Services
E-mail: victoria.eccles@southlanarkshire.gov.uk
42

Page 43

A Masterplan for
Hamilton Town Centre:
Executive Summary
6
43

Page 44

a masterplan for hamilton town centre
This new Vision for Hamilton
seeks to demonstrate the physical
and spatial moves and approach
required to deliver a re-energised
and resilient town centre core. The
Vision re-imagines the future of
Hamilton and sets out to define the
next phase of its evolution.  
44

Page 45

a masterplan for hamilton town centre
A town centre reinvented...
Hamilton - A connected,
inclusive & resilient town centre
...for the Community
An inclusive and accessible town centre
with increased levels of living, working and
play for all, regardless of mobility or income
...for Living
A town centre that provides a broad choice
of different housing opportunities in terms
of type and tenure and supports these with
essential services, creating a true 20 minute
neighbourhood.
...for Leisure & Culture
A town centre that serves not just its local
population but a vibrant hub for the wider
region, home to essential leisure and
cultural services
...for Active Travel
A permeable town centre that prioritises
people over cars and facilitates walking,
cycling and public transport accessibility
right at its heart
Concept Sketch
New Cross Shopping Centre Site Proposals
Regent Centre Proposals: A New Residential Quarter
45

Page 46

3
Former Bairds Department Store
Residential Use / Office Space /
Meanwhile Space
5
Duke Street Car Park
Student / Hotel accommodation with new
town centre car parking provision
4
Keith Street Car Park
New residential gateway block
and public car parking
A number of key assets and sites of
opportunity were identified as part of
the initial project scope:
1. The New Cross Shopping Centre
2. The Regent Shopping Centre
3. Former Bairds Department Store
4. Keith Street Car Park
5.  Duke Street Car Park
6.  Hamilton Police Station
Study Area and Key Sites
2
The Regent Shopping Centre
A new mixed-use residential led
neighbourhood
1
The New Cross Shopping Centre
A new mixed-use residential led
neighbourhood
(6. Hamilton Police Station - shown in same image)
5
C
5
2.  The Regent
Shopping Centre
1.  The New Cross
Shopping Centre
5.  Duke Street
Car Park
4.  Keith Street
Car Park
6.  Hamilton Police
Station
Castle Street
Vogue Cinema
Site
3.  Former Bairds
Department
Store
a masterplan for hamilton town centre
46

Page 47

New Cross Centre
Flats
Family Townhouse / Terrace
Active ground floor use
Proposed DevelopmentExisting Condition
Demolition to street level with retention of
‘basement’ service area and parking (subject
to technical assessment)
-
Opportunity to reinstate historic route: Chapel
Street, to improve permeability
-
Proposed mixed-use residential-led
development with active ground floors
-
Potential to incorporate office or service use
adjacent to the Top Cross
-
Adjacent Police Station and Court site: potential
residential development or location for new
Nursery
Police Station Site:
Potential circa 20 new
homes
Sketch view of proposals from Top Cross
Potential to
provide circa
80
new homes
a masterplan for hamilton town centre
This new development, with the reintroduction of active street
level units and routes has the potential to positively transform
the setting of the Top Cross and greatly increase footfall
around Quarry Street, benefitting existing businesses
47

Page 48

Regent Centre
Existing Condition
Flats
Family Townhouse / Terrace
Active ground floor use
Potential Student / Hotel
Later living accommodation
Proposed Development
New pedestrian / cycle friendly residential street
at heart of new neighbourhood
Demolition of asset. Options for former M&S
unit to be considered
-
Proposed significant mixed-use residential-led
development with active ground floors
Improved town centre permeability through the
introduction of new streets and spaces
-
Opportunity to reinstate historic routes in lieu of
enclosed inward looking malls
-
Potential for a wide variety of house types and
tenures (Private, Social, Later Living etc.)
-
New active travel connection proposed from
the public transport hub right through the heart
of the new neighbourhood Alternative Option:
Retention of M&S Building
Potential to
provide circa
350
new homes
The Regent Centre site provides a significant
opportunity to transform Hamilton town centre with the
introduction of a new residential-led neighbourhood
a masterplan for hamilton town centre
48

Page 49

Sketch view of a repurposed and transformed Bairds, capable of
hosting a variety of uses
Massing view of redevelopment option: Residential
with active ground floor unit to key corner
Bairds Building
Existing Condition Potential Development Options
Option to demolish and redevelop to provide
additional residential units over an active
ground floor
-
Potential alternative to repurpose and reinvent
as a mixed-use building capable of containing a
variety of uses
‘Meanwhile’ Uses
Potential food
vendors and
seating
a masterplan for hamilton town centre
Potential to
provide circa
20
new homes
Option 1:
Redevelopment
Redevelopment takes time therefore there
is an option to demolish and use this space
for a potential F&B / Leisure offer prior to
redevelopment
Option 2:
Retain & Repurpose
Bairds site as part of larger
assembly with Regent
Centre redevelopment
49

Page 50

Massing view of redevelopment option: Residential
with active ground floor unit to key corner
M&S Building
Existing Condition Potential Development Options
EXTERNAL
PLAY AREAS
Option 1:
Redevelopment Potential to
provide circa
40
new homes
Sketch view of building retained and repurposed
Option 2:
Retain & Repurpose
Potential reinvention into a building capable of
hosting a variety of uses (Office / Healthcare /
Community etc.)
Flats
Active ground floor use
a masterplan for hamilton town centre
Option to demolish and redevelop to provide
additional residential units
-
Alternative option to repurpose existing building:
massing provides ‘buffer’ to Duke Street
-
Potential to be ‘landmark’ on new active
travel route through adjacent residential-led
neighbourhood
-
Potential reinvention into a building capable of
hosting a variety of uses (Office / Healthcare /
Community etc.)
50

Page 51

Car parking
Workspace Unit
Car parking
Car parking
Car parking
Duke Street MSCP
Existing Condition Proposed Development
Massing view: New MSCP and Student Residential block
Potential street level workspaces within new MSCP View of potential new active travel link to transport interchange
Introduction of green
/blue infrastructure
to mark east/west
residential streets
Introduction of
cycle route from
active travel hub
through new
neighbourhood
Connection to
existing train and
bus transport
networks
Existing car park structure believed to be in a
poor state of repair
-
Proposed demolition of existing building and
replacement with new smaller MSCP that uses
same access and exit points as previous car
park
-
New structure incorporates street facing
workspaces at ground floor level to provide
active frontages.
-
Potential new student resi / hotel block
proposed for remainder of site
-
New active travel route connecting to public
transport hub at heart of redeveloped site
a masterplan for hamilton town centre
51

Page 52

Quarry Street
Rebalance away from retail by introducing a
more diverse range of street level uses (F&B,
leisure, health and community etc.)
-
Diversifiy in tandem with retention of existing
retail where possible and introduce a more
local and artisinal retail offer
-
Implement improvements to the public realm:
new greening, seating and shelter
-
Reintroduce vehicular traffic in one direction
and combine with dedicated accessible
parking
-
Infill gap sites and repurpose significant assets
at Top and Bottom Crosses to ‘bookend’ street
Existing Condition The resilient spine of Hamilton town centre
Existing Residential at upper levels
Existing street level uses New residential
Retail
F&B / Leisure
Residential
Office / Commercial
Culture / Community
a masterplan for hamilton town centre
Top Cross
Bottom
Cross
52

Page 53

Castle Street & Vogue Site
Existing Condition Proposal: A New Urban Park for Hamilton
New ‘community’
pavilion with protected
outdoor greenspace
(Youth Hub / Nursery)
Ramped
access to
mid level
retained
New F&B Unit
with external
terrace
Ramped access
to retail park
maintained
Landform stepped
seating facing
bandstand
New covered
bandstand facing into
new urban park
New F&B unit with
external covered seating
facing retail park
Childrens Play
Sensory
Garden
Seating and
Planting
area
Vogue Site:
Potential new Leisure Use
Proposed new ‘Urban Park’ replacing extensive
hard landscaped ‘plaza’ containing a variety of
all age activities and uses
-
Opportunity to provide much needed
amenity space for potential new residential
neighbourhoods and the wider community
-
Provides extensive green / blue infrastructure
within the town centre
-
Strengthens links between the retail parks and
the traditional town centre
-
Potential incorporation of new pavilion buildings
suitable for a variety of uses
a masterplan for hamilton town centre
Sketch view of potential urban park
53

Page 54

Redevelopment of
former Bingo site to
provide new leisure
uses
New residential
point block on part
of Keith st. Car park
as ‘gateway’ to town
centre
New workspace/
start up units on site
of existing retail, with
pend access and car
parking
New residential
point block with
commercial ground
floor and public
square in front
New residential
blocks incorporating
family housing, later
living, commercial
ground floor units,
amenity and car
parking
New residential
infill block to
Quarry street with
pend access to
Campbell Lane with
commercial ground
floor
New residential
development to
incorporate family
townhouses and
apartments on the
site of the former
police HQ and court
buildings (potential
nursery option)
New ramped and
stepped access
to Chapel st
incorporating green/
blue infrastructure
New mixed-use
urban block built
around Quarry
Lane to incorporate
residential above
small scale retail units
New mixed-use urban
block with residential
built over retained
lower level of new
cross MSCP.
Enhancement
of public realm
connection from
travel hub to the high
cross
Potential new student
accomodation/
Hotel as part of
redevelopment of
Duke st MSCP site
New urban pocket
park at the centre
of residential
neighbourhood
with kids play and
green / blue streets
incorporating new
cycle routes
Family housing with
parking
Retention of
servicing route for
Quarry street
New improved
crossing of ring road
for pedestrians and
cyclists
Upgrade of
pedestrian / cycle
route from station
to Duke st MSCP to
improve active travel
routes
Redevlopment of
Duke st MSCP to
provide new MSCP
with active ground
floor commercial
units
New pedestrian street
with green / blue
infrastructure as part
of site redevelopment
Castle street public
realm to become
new urban park with
pavilions to take
F+B / commercial
uses, bandstand and
provide green / blue
infrastructure
A Transformed Town Centre
a masterplan for hamilton town centre
54

Page 55

55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 21 February 2024
Report by: Chief Executive  
Subject: Office Closure – Festive Period 2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 request approval for the proposed closure of appropriate offices on Friday 27
December 2024 and Friday 3 January 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the proposed office closure on 27 December 2024 and 3 January 2025
be approved; and
(2) that the requirement for some employees to use 2 days annual leave for the
proposed office closure be approved. 
3. Background
3.1. In recent years, the Council has maintained all council offices and services being
open and available over the festive period on any days which are not public holidays. 
Some limited services are delivered during the public holidays but, generally, offices
are closed.   
3.2. There is a division in service demand over the festive period, with some services
operating as normal and others with very limited requests.  In general, office-based
services, unless they are associated with an operating frontline service, are not in
high demand and, as a result, many employees take annual leave over that period
with offices operating with a skeleton staff.   
3.3. Festive public holidays fall on a different day of the week each year and for the
coming year the pattern is:- 
 25 and 26 December 2024 – Wednesday and Thursday
 1 and 2 January 2025– Wednesday and Thursday 
4. Proposal
4.1. The pattern of public holidays means that Friday 27 December and 3 January will be
preceded by two days of closure, followed by a closed weekend. The request is to
close as many offices as possible to avoid unnecessary heating and lighting of these
premises and allow employees the opportunity to take a longer break.
7
57

Page 58

4.2. Therefore, the proposal is that the main council offices will be closed, and that
Executive Directors be empowered to take decisions on other premises in
consultation with the Trade Unions after consideration of service needs.   
4.4. Public holiday arrangements for dealing with any service issues would remain in
place for 27 December 2024 and 3 January 2025. 
5. Employee Implications
5.1. A closure on 27 December 2024 will require employees to retain one day of annual
leave for this purpose from the current leave year. To facilitate the closure on 3
January 2025 employees can use an annual leave day from 2025 allocation. 
6. Financial Implications
6.1. There are no financial implications associated with this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The additional day of closure will facilitate a reduction in the requirement for heating
and lighting over the festive period in some offices. 
8 Other Implications
8.1 There are no risks associated with this report. 
9 Equality Impact Assessment and Consultation Arrangements
9.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. Consultation on this proposal has taken place with the Trade Unions. 
Paul Manning
Chief Executive 
31 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Fair, open and sustainable
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Michelle Milne, Head of Personnel Services
Ext:  4330 (Tel:  01698 454330)
E-mail:  michelle.milne@southlanarkshire.gov.uk 
58

Page 59

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 21 February 2024
Report by: Chief Executive  
Subject: Council Tax - Second Home Dwellings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 outline the powers available to vary council tax on second home dwellings and
to consider the implementation of a change to the current approach from 1 April
2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) consider the implementation of a 100% council tax surcharge on all second
homes from 1 April 2024.
[1recs]
3. Background
3.1. A second home is defined as a dwelling which is furnished and lived in for at least 25
days during any 12-month period but is no one’s sole or main residence. Second
homeowners currently receive a 10% discount on their council tax for that property. 
3.2. However, there has now been a change in the law through the Council Tax
(Variation for Unoccupied Dwellings) (Scotland) Amendment Regulations 2023. This
change enhances the Council’s discretionary powers under the Council Tax
(Variation for Unoccupied Dwellings) (Scotland) Regulations 2013. This means the
Council can now add up to a maximum 100% surcharge on second homes –
councils are able to double the council tax on second homes. Currently, this
discretionary power only exists for long term empty properties. 
3.3. The enhanced powers to implement a maximum 100% council tax surcharge on
second homes becomes effective from 1 April 2024. The surcharge does not apply
to water and wastewater charges. 
3.4. Second homes can restrict or reduce the availability of housing in local authorities,
particularly when it is recognised that there is a national housing crisis and
homelessness levels are at their highest level since records began. The application
of a surcharge may, therefore, help to bring more properties into the housing market,
an approach consistent with the Local Housing Strategy 2022-2027. 
4. Current Position
4.1. There are currently 174 domestic properties, out of a total property base of 158,939
in South Lanarkshire, categorised as second homes in the council tax system. 
8
59

Page 60

These properties are privately owned and currently receive a 10% second homes
discount to an annual value of £0.023 million in total. 
4.2. Annual council tax property charges levied on second homes currently amount to
£0.208 million and in-year collection levels are extremely high, expected to be more
than 97% for 2023/24. 
4.3. Second homes are spread throughout South Lanarkshire as summarised at
Appendix 1. The numbers in each council tax band are outlined in the table below. 
Table 1: Council tax band of current second homes 
BAND NUMBER  
A 43
B 31
C 28
D 20
E 29
F 15
G 5
H 3
TOTAL  174 
5. Proposal 
5.1. With the objective of increasing the supply of properties into the housing market, it is
requested the committee consider utilisation of the discretionary powers contained
within the ‘The Council Tax (Variation for Unoccupied Dwellings) (Scotland)
Amendment Regulations 2023’ to implement a 100% surcharge on second home
properties effective from 1 April 2024. If agreed, this means that a 200% council tax
charge would apply to second homes. 
5.2. If agreed, operational procedures will be developed to ensure that the additional levy
is accurately administered. No discretion will be available in individual circumstances
to waive or amend the 100% surcharge. The annual property charge payable before
and after the surcharge is applied is highlighted at Appendix 2. This does not reflect
any increase in council tax into 2024/2025. This also does not include water and
sewerage charges that may be payable on the properties, as they are unaffected by
the surcharge. 
6. Customer Information
6.1. Publicity including press releases will be agreed with the council’s Corporate
Communications team to ensure awareness of the changes prior to implementation
for 2024/2025 if the proposal is agreed. 
7. Employee Implications
7.1. Existing staff from Benefits and Revenues Services would administer the changes to
the policy. 
8. Financial Implications
8.1. If agreed, it is estimated that an additional £0.126 million will be raised annually
through implementing the surcharge. 
60

Page 61

8.2. One off set up costs relating to upgrading the council tax system are estimated at
£0.010 million and would be met from existing budgets. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. There is a risk the introduction of a surcharge does not increase the supply of
housing given the relatively low number of second homes in South Lanarkshire. 
10.2. There is also a risk of owners of second homes adopting alternative structures in the
management of their second homes. This has the potential to impact on the financial
implications as detailed in section 8. 
11 Equality Impact Assessment and Consultation Arrangements
11.1. An Equality Impact Assessment has been carried out and no negative impact on any
specific equality group has been identified. No consultation has been carried out in
relation to this policy. 
Paul Manning
Chief Executive 
12 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Fergusson, Head of Finance (Transactions)
Ext:  4951  (Tel:  01698 454951)
E-mail:  craig.fergusson@southlanarkshire.gov.uk
61

Page 62

Appendix 1 
Second Homes by Council Ward 
Ward Number
Avondale and Stonehouse 16
Blantyre 2
Bothwell and Uddingston 15
Cambuslang East 3
Cambuslang West 6
Clydesdale East 38
Clydesdale North 16
Clydesdale South 7
Clydesdale West 6
East Kilbride Central North 8
East Kilbride Central South 7
East Kilbride East 7
East Kilbride South 2
East Kilbride West 7
Hamilton North and East 15
Hamilton South 3
Hamilton West and Earnock 4
Larkhall 2
Rutherglen Central and North 7
Rutherglen South 3
Total 174 
62

Page 63

Appendix 2
Second Homes 
Property charge payable per Band based on 2023/24 charges 
Band
Annual property
charge 
£
Annual property
charge currently
payable (incl.10%
discount)
£
Annual property
charge payable after
100% surcharge   
£
A 867.21 780.49 1,734.42
B 1,011.74 910.57 2,023.48
C 1,156.28 1,040.65 2,312.56
D 1,300.81 1,170.73 2,601.62
E 1,709.12 1,538.21 3,418.24
F 2,113.82 1,902.44 4,227.64
G 2,547.42 2,292.68 5,094.84
H 3,186.98 2,868.28 6,373.96 
63

Page 64

64

Page 65

Report
Agenda Item 
Report to:  Executive Committee
Date of Meeting:  21 February 2024
Report by:  Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Leisure and Culture – Activage
Proposals for 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to: - 
 present recommendations for amending the concession rate for Activage for
2024/2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation made by the Board
of South Lanarkshire Leisure and Culture (SLLC):- 
(1) that the price of the annual Activage membership is increased from £80.25 to
£120. 
3. Background
3.1. Like all local authorities, Leisure and Cultural providers across Scotland are facing
significant increased pressure on their budgets. The majority are considering, or have
implemented, price increases and many have also had to reduce the scope of their
services. 
3.2. As with South Lanarkshire Council, SLLC is experiencing extraordinary financial
pressures due to inflation levels on areas including pay, utilities and contracts
combined with the impacts of reducing public sector funding. 
3.3. Approval was given at a full Council meeting in June 2021, and further agreed at the
SLLC Board meeting in August 2021, that the Board of SLLC have full autonomy to
review and set the pricing for all SLLC commercial activities in line with market
tolerances and trends. It was agreed that the Council would retain the authority to
decide concession pricing, which includes the Activage membership. 
3.4. At Members’ Awareness Sessions held on 24 November 2023 and 29 January 2024,
SLLC officers advised Councillors of SLLC’s projected budget gap of £6.335m for
2024/25 (before any management fee reduction), along with a range of options under
consideration by SLLC to close the anticipated budget gap, including price increases
across many of its services. 
3.5. At a Board meeting on 15 January 2024, SLLC approved a recommendation to ask
the Council to approve the increase in the price of the Activeage membership, in line
with SLLC’s proposals to reduce the funding gap. If agreed, the recommendation in
9
65

Page 66

this report would enable SLLC to realise £0.287m of additional income, reducing the
funding gap by that amount. 
3.6. Should the concession proposal in this report not be agreed, there would be a
requirement for the SLLC Board to approve service reductions, commensurate with
the amount of income associated with this concession proposal. This would most likely
be in the form of further rationalisation of services. 
3.7. The SLLC Board has a legal duty to set a balanced budget similar to that held by
elected members in relation to setting a balanced budget for the council. The scale of
the financial pressures faced by SLLC inevitably means that service levels cannot be
maintained, and difficult decisions will need to be faced. The challenge requires
consideration of a range of measures to mitigate those decisions and the concession
scheme change below has been recommended by the SLLC Board to assist with this
process. 
4.  Concession Recommendation – Activage (£0.287m) 
4.1. Activage is a universal product that provides South Lanarkshire residents aged 60+
access to leisure facilities including swimming and health suites, East Kilbride Ice Rink,
cultural and libraries activities, golf courses and more (Appendix 1). 
4.2. The current cost of the membership for residents aged 60+ is £80.25 for the full year
to be paid in one or two instalments at set points in the year. 
4.3. SLLC completed a benchmarking exercise which compared Activage to similar local
authority 60/65+ fitness products. Appendix 2 outlines the overall pricing position of
the Activage product compared to similar and neighbouring Authorities. It is noted that
the proposed price point of Activage would be less than half of the price point that most
comparable products are sold at. 
4.4. SLLC undertook a consultation with residents between 24 November and 15
December 2023 in which Activage members were asked if they believed the product
to be value for money. 
4.5. A total of 1,691 returns to the survey were completed by those saying they were
Activage members. 95% of the Activage members responding to the statement relating
to value for money agreed very strongly or strongly that Activage was value for money
(Appendix 3). Additionally, 74% of all those responding to the survey statement relating
to price increases (4,716) agreed very strongly or strongly that they would be willing
to accept price increases for the services provided by SLLC if it assisted in delivering
continued service provision (Appendix 3). 
4.6. It is proposed that the increase to the Activage annual membership from £80.25 to
£120, an increase of £39.75 over the year or 50%, would be accompanied by the
introduction of the facility to spread the cost over the year at £10 per month, to ease
the transition to the new offer. This remains lower than the concession rate on a
standard fitness membership. 
4.7. It is anticipated that the proposal could generate £0.287m of additional income. 
5. Next Steps
5.1. Following Council approval, implementation of new concession rates would
commence. 
66

Page 67

5.2. A meeting of the Board of SLLC is due to take place on 28 February 2024 following
the full Council meeting on 21 February 2024. This meeting will consider further
measures required to achieve a balance budget for 2024/25. 
5.3. SLLC will undertake a marketing campaign extolling Activage benefits in 2024. This
will encourage existing and new members to access the wider range of activities on
offer and ensure the target audience has the opportunity to discover more about the
benefits of which they could be taking advantage. 
6. Employee Implications
6.1. There are no employee implications as a result of this report. 
7. Financial Implications
7.1. SLLC has an estimated budget gap of £6.335m for 2024/25 (before any management
fee reduction) arising from an invariable management fee, exceptional inflationary
rises in costs, related pay increases, the residual impact of the COVID19 pandemic
and the subsequent cost of living crisis/ economic situation on their income. 
7.2. The Board has a legal duty to set a balanced budget and the recommendations in this
report will reduce the budget gap by £0.287m. This set of measures will assist in
mitigating the impact on service levels across the entire SLLC operation. 
7.3. The SLLC Board will consider the decision of Council at its subsequent meeting
scheduled for 28 February 2024, following the Council budget meeting, where it will
consider the measures it will require to take to ensure it sets a balanced budget. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental implications as a result
of this report. 
9. Other Implications
9.1. There are no other implications as a result of this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. An Equalities Impact Assessment has been conducted in relation to the proposals by
SLLC. 
10.2. SLLC undertook a consultation survey between 24 November and 15 December 2023
as detailed in sections 4.4 and 4.5 of this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
5 February 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee – 23 June 2021 – Cross Party Working Group Review of South
Lanarkshire Leisure and Culture (SLLC) - Outcomes  
67

Page 68

List of Background Papers
 None 
Contact for Further Information
David Booth, Executive Director (Community and Enterprise Resources)
E-mail: David.booth@southlanarkshire.gov.uk 
68

Page 69

Appendix 1 – Activage benefits 
Activage members get access to: 
 9 swimming pools
 16 fitness gyms
 9 health suites
 Racquet sports
 Fitness classes
 East Kilbride Ice Rink
 Libraries activities
 Cultural activities
 Golf courses (conditions apply) 
In addition, there are a number of bespoke services and classes which are specifically
designed for older adults:- 
 Active Mondays: John Wright Sports Centre
 Active Tuesdays: Alistair McCoist Complex
 Active Wednesdays: Larkhall Leisure Centre
 Active Thursdays: Carluke Leisure Centre 
Benefits
 Active Days are inclusive sessions allowing people to try a variety of different leisure
and culture activities such as specially designed fitness sessions, music recitals, tea
dances, walking football, Aquafit, free course of swimming lessons, personalised
fitness programme. Attending the activities also provides the chance to have a cup of
tea/coffee and a chat.
 Sign up at one of our five cultural venues and benefit from a one off offer of £20 off a
ticket to a performance of your choice.  
 Six free rounds of golf per year at any of our six golf courses, Monday-Thursday.
 Free one hour introductory session on how to research your family history.
 Access to library digital sessions, including how to access useful Apps, iPad basics
or 3D printing workshops.
 Buy one coffee and get one free during specified times at:- 
 East Kilbride Arts Centre Mon-Fri 9:00am-4:00pm
 Rutherglen Town Hall Mon-Fri 9:00am-4:00pm
 Chatelherault Country Park 3:00pm-4:30pm, plus receive 20% off at retail shop
 Low Parks Museum Mon-Fri 1:00pm-2:30pm, plus receive 20% off at retail shop 
 Free pay to play with bowls hire at HPSG, Brancumhall and Strathaven Park, Tue-Thu 
 Free tennis court hire HPSG and Strathaven Park (anytime – max 1 hour play)
 Free putting at Strathaven Park, 11am onwards Free pitch and putt at Brancumhall
Golf Development Centre 
69

Page 70

Appendix 2 – Benchmarking
The below chart and table depict the findings of a benchmarking exercise into the Local authority fitness products. The table
outlines which products closely matched the SLLC Activage product.
70

Page 71

Activage Comparisons     
Local Authority Membership name Cost monthly Cost annually What's included
SLC Activage  - £80.25 everything generally
NLC Active 60  - £60 Everything
Glasgow Life No specific 60+ membership £29  - Everything
One Ren -
Renfrewshire
Signature 65+  £25 
(6mths £139,
12mths £249) 
- Gym/Swim/Classes and
Online
Excite - West
Lothian
Active 65+ £23.95 (single)
£43 (couple) 
- Gym/swim/classes/ no golf
range
Midlothian Active Golden Years 65+ £31.20 (single)
£55.60 (couple)
£312 (single)
£556 (couple)
Swim/gym/health
suite/running
classes/tennis/bowls/putting
East Ayrshire 65+ as part of concession,
disabled, unemployed, students,
carers
£20.00  - Gyms/fitness
classes/swim/racquet sports
Dumfries &
Galloway - DG
Leisure
Prime Membership (receiving
state pension)
£21.00  - Gyms/swim/health suite/court
hire
North Ayrshire - KA
Leisure
60+ as part of concession £20.30  - Swim/gym/classes/track/ice
rink
Edinburgh Leisure 65+ Concession £41.50  - Gym/swim/classes
Falkirk No 60+ but can buy a Go Card
which gives discounted rates
-  -  - 
71

Page 72

Appendix 3 – Consultation 
Included in the first phase of SLLC consultation with residents on savings proposals for
2024/25 were two elements relating to Activage. First, a qualifying question and, once
established that the respondent was an Activage member, a follow up asking for a response
to the statement: ‘Activage is value for money’. 
There was also a statement relating to potential general price increases.
The responses are below: 
The consultation shows that 36% of respondents to the survey said they were Activage
members and of the number responding to the statement relating to value for money, 95%
strongly agree or agree that the product is value for money. 
74% of all those responding to the survey statement relating to price increases (4,716)
agreed very strongly or strongly that they would be willing to accept price increases for the
services provided by SLLC if it assisted in delivering continued service provision. 
72

Page 73

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 21 February 2024
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Former Larkfield Hall and Stonefield Road Pitches,
Blantyre – Community Asset Transfer to Blantyre
Soccer Academy 
1. Purpose of Report
1.1. The purpose of the report is to:-[purpose]
 advise of a request for Community Asset Transfer of the former Larkfield Hall and
Stonefield Road pitches, Blantyre
 seek approval to the sale to Blantyre Soccer Academy 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the sale of the former Larkfield Hall and Stonefield Road pitches, Blantyre,
to Blantyre Soccer Academy, subject to the terms and conditions set out in
section 5 of this report, be approved; and
(2) that the Executive Director (Housing and Technical Resources), in conjunction
with the Head of Administration and Legal Services, be authorised to conclude
all matters in respect of the sale and enter into the necessary legal agreements
on terms which are in the best interests of the Council.
3. Background
3.1. In 2019 and 2021, the Council transferred ownership of the former Rowan Hall and
then the adjoining open space to Blantyre Soccer Academy, from which they now
operate a community hub and garden. 
3.2. Blantyre Soccer Academy are seeking to expand their activity and to create a home
base for their community football club and develop a synthetic pitch to accommodate
both training and competitive matches. 
3.3. The organisation’s application for the sports facility at Jock Stein, Hillhouse, Hamilton
was unsuccessful in 2021 and a fresh approach has been made to the Council under
the terms of the Community Empowerment (Scotland) Act 2015 for purchase of the
former Larkfield Hall and adjoining Stonefield Road pitches. 
3.4. The validation date for the request was 22 September 2023.  In addition to placing the
application and supporting documentation on the Council’s Planning Portal, notices
were placed on the property advising that the Council was considering an asset
transfer.  The closing date for responses was 19 October 2023 at which time 479
representations were received, all of which were in support of the proposal. 
10
73

Page 74

3.5. The request was placed before the Community Asset Transfer Assessment Panel on
4 and 12 December 2023 when the following matters were taken into consideration. 
3.6.  Property
3.6.1. The land requested, as shown on the attached plan, is the former Larkfield Hall and
the adjoining pitches at Stonefield Road, Blantyre. 
3.6.2. The hall and pitches are owned by the Council and not operationally required, with the
hall having closed several years ago and the pitches rarely used for sport. The costs
associated with the vacant hall are circa £5,000 per annum and it is estimated that
around £30,000 is required for immediate repairs. Subject to the proposed disposal,
Blantyre Soccer Academy will have full responsibility for all maintenance costs for all
land and buildings within the boundary from the date of entry. 
3.6.3. Whilst the hall and the pitches are potentially marketable, the pitches are formed on
the site of a former bing, and it is anticipated that any development of the site would
be constrained by ground conditions (refer to section 4.6). 
3.6.4. Planning and Building Standards have indicated that planning consent will be required
for change for some aspects of the proposed refurbishment of the pitches. 
3.6.5. The Council and Blantyre Soccer Academy have jointly appointed the District Valuer
to place a value on the property, with both parties sharing the fee. The District Valuer
has placed a value of £95,000 on the property, reflecting current use as the land is
categorised as Green Network and Priority Greenspace in the SLC Local Development
Plan 2 and would not be supported for residential development. 
3.7. Organisation
3.7.1. Blantyre Soccer Academy is a Scottish Charitable Incorporated Organisation (SCIO),
Scottish Charity No. SCO43613, and has been established since 2014. 
3.7.2. The organisation has an established board of trustees, more than the required 20
members, 3 employees who carry out the day-to-day management of the organisation
and circa 75 accredited team coaches. They currently operate 25 teams with young
people from the age of 10 up to 20 being supported. Their competitive teams include
both female and disabled teams. 
3.7.3. The objectives of the organisation are:- 
 to advance public participation in amateur sport of football by promoting the game
of football through the provision of recreational facilities and activities and
improve the fitness and health of the persons for whom the facilities/activities are
primarily intended 
 to advance community development by providing a safe environment to
encourage and promote the development of football, health, self-esteem, health
and friendship within the community of Blantyre and its environs 
 to provide facilities and equipment and it will be available to anyone irrespective
of race, colour, religion, sex, sexuality or disabilities, promoting a respect for
diversity and encourage people to take pride in themselves and their team mates
through the game of football 
3.7.4. The organisation has experience in managing property, has been successful in
obtaining funding and delivering a range of community-based projects that go beyond
74

Page 75

football such as a community hub and garden, community laundry and Blantyre Bikes
Better. 
3.7.5. The organisation is financially stable and the latest accounts show unrestricted funds
in excess of £100,000. 
3.8. Project
3.8.1. The proposal is to transfer the ownership of the hall and pitches through outright sale
and thereafter Blantyre Soccer Academy will reopen the hall for local community use
and upgrade the pitch to synthetic level to accommodate both training and competitive
matches. There are also proposals to create a five a side pitch and changing facilities. 
3.8.2. The cost of the initial pitch upgrade is estimated at £1.029 million. Blantyre Soccer
Academy are in discussions with a number of funders and to date have secured an
offer of £700,000 towards this investment from the Scottish FA, as part of the
Grassroots Football Facilities Fund provided by Secretary of State for Culture, Media
and Sport. 
3.8.3. The business model is based upon the pitches generating the majority of the regular
income and the hall being managed on a “break even” basis. 
3.8.4. Consideration has been given to the potential consequences for SLLC arising from
Blantyre Soccer Academy reducing its lets of other facilities. Whilst there may be a
short-term interruption to income, it is believed that there is sufficient demand from
other organisations to take up the released availability. 
4. Assessment
4.1. The property is suitable for the proposed use and whilst the hall could potentially be
sold on the open market, demand is most likely to be restricted to the immediate
locality. The proposal delivers around £1 million of investment in local facilities and the
reopening of the hall for community use. 
4.2. The organisation is well established and has capacity. Blantyre Soccer Academy has
a track record of securing funding and delivering projects. Whilst this is the largest
scale project undertaken, the risk of failure is considered low. 
4.3. The Community Benefit has been assessed at a score of 120 which would equate to
86% discount on market value. The request is to purchase at £1, however, Blantyre
Soccer Academy are aware that, if the asset transfer is approved, the Council expects
a capital receipt. 
4.4. Whilst the request is for ownership of a large area of land, the continued use of the
area for community activity is protected by its status as priority greenspace in the
current development plan, the context of the latest planning policies such as the recent
NPF4 and the fact that if Blantyre Soccer Academy were to propose to develop the
site for alternative purposes, they would require to repay grant funding that they
receive through the SFA. The Grassroots Football Facilities Fund grant conditions last
for 25 years. 
4.5. Therefore, it is considered highly unlikely that consent to redevelop the site for
residential purposes would be permitted in the foreseeable future. To mitigate any
remaining risk, the sale should be conditional upon planning consent being granted
for the project and evidence of the funding package prior to settlement. 
75

Page 76

4.6. Whilst no intrusive site investigations have taken place, a previous Desktop study of
the ground conditions based on a search of available published information noted that
the site is part of a former colliery and the potential for contamination on the site from
its historic use was regarded as High. The ground, which is raised from road level, is
made ground of soft clay and silt with stronger clay at a depth of 5 metres while rock
is believed to be at considerable depth. It is, therefore, anticipated that complex
foundation solutions would be required for any development. In light of these factors,
it is considered that the viability of development of the site would be very challenging. 
4.7 The statutory guidance on asset transfer highlights that condition can be imposed to
return any increase in value to the authority where the price was based on a lower
valuation for a particular use, if the use of the property is changed. It is recommended,
therefore, that a condition of this nature is included in the sale. 
5. Proposal
5.1. It is proposed to dispose of the former Larkfield Hall and Stonefield Road pitches along
with all future maintenance responsibilities, as shown on the attached plan, to Blantyre
Soccer Academy, on the following principal terms and conditions;
1. The purchase price £13,300 i.e.14% of District Valuers valuation (exclusive of
VAT)
2. The sale to be conditional upon
a. Planning consent for the pitch upgrade
b. Evidence of the availability of funding to deliver the pitch upgrade,
including a robust strategy for the financial gap between the Grant and
the projected cost. 
c. Protection in the title for the value of any change of use 
3. The date of entry to be mutually agreed
4. Each party to bear their own legal fees and expenses 
6. Employee Implications
6.1. There are no employee implications. 
7. Financial Implications
7.1. The proposed asset transfer removes the future liability for the maintenance of the
hall, currently estimated at £5,000 per annum. 
7.2. Although the disposal is at less than the assessment of market value, there is no
guarantee of a purchaser for the hall and pitches should it be placed on the open
market. 
7.3. The proposed asset transfer will deliver circa £1 million of investment in the community
facilities. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained within the report. 
9. Other Implications
9.1 The proposal will see a reduction in the requirement for Blantyre Soccer Academy to
book other facilities and consideration has been given to the potential impact on SLLC
income resulting from the loss of these bookings. Whilst there may be a temporary
interruption of income, SLLC are confident that other local clubs will take up the
opportunity for additional bookings and, therefore, the proposal has minimal long term
impact. 
76

Page 77

9.2. In terms of the Community Empowerment (Scotland) Act 2015, the Council has until 
22 March 2024 to provide a notice of its decision whether to agree to or refuse the
asset transfer request. 
9.3. The organisation has a right to appeal to Scottish Ministers should a decision not be
made in that timescale or the asset transfer request be refused or they consider any
condition imposed to be disproportionate. 
10. Equality Impact Assessment and Consultation Arrangements
10.1 Consultation has taken place with the SLLC, Land Services, Planning, Legal, and
Finance Services as well as having been published for public consultation. 
10.2. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
8 February 2024 
Link(s) to Council Values/Priorities /Outcomes
 Accountable, effective, efficient and transparent
 Focused on people and their needs
 Working with and respecting others 
Previous References
 None 
List of Background Papers
 CAT reference CAT/23/0009 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Joanne Forbes, Head of Property Services
Ext: 4073 (Tel: 01698 454073)
E-mail: joanne.forbes@southlanarkshire.gov.uk 
77

Page 78

78

Page 79

184
34
El Sub Sta
100
84 Hall
177
ESS
27
121
19
119
105
164
82 3
159
35
1
12
105
120 to 126
93
Iona Path
175
8
165
25
GLENFRUIN
ROAD
170
1
2
127
33
3
11
2
44
Iona Path
20
119
50
Shelter
179
80
Path
12
17
30
El
Sub Sta
1 to 11
WATSON STREET
123
PH
131
PH
91 177A
Mast
Playing Field
Teviot Way
2
20
1 to 11
GLENFRUIN ROAD
LB
BROOMPARK ROAD
75.0m
84
Iona Path
167
Langholm
Path (um)
3
1
The Beeches
Ordnance Survey
Digital Data
Scale 1:1,500
Produced by H&T Property Services (Estates) - 20 June 2023
Title: Ground at Broompark Road
Town: Blantyre
© Crown copyright and database rights 2023
Ordnance Survey 100020730.
10
79

Page 80

80

Page 81

Report
Agenda Item 
Report to: Executive Committee
Date: 21 February 2024
Prepared by: Director, Health and Social Care  
Subject: National Care Service - Update 
1. Purpose of Report
1.1. The purpose of the report is to: 
 to provide the Committee with an update on the National Care Service (Scotland)
Bill 
2. Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s): 
(1) that the update provided on the National Care Service (Scotland) Bill is noted. 
3. Background
3.1. The National Care Service (NCS) Bill was published in June 2022 and provided for
the establishment of a NCS, under the responsibility of Scottish Ministers. The Bill,
as published in 2022, provided for the transfer of listed social care and social work
local authority functions, staff and assets to Scottish Ministers or newly established
local care boards. 
3.2. In responding to the NCS Bill, COSLA Leaders reiterated their commitment to
improving the quality and delivery of social care services in Scotland. Leaders noted
the significant value in keeping care local but did recognise benefits that a NCS
designed to complement, not disrupt, local service delivery could bring. Leaders did
not accept that the best way to secure improved outcomes for people was through
expensive and disruptive structural reform and the transfer of Local Government
staff, functions, and assets to a NCS. 
3.3. On 22 November 2022, South Lanarkshire Council unanimously agreed a motion
calling on the Scottish Government:- 
a. To focus the objectives of the proposed National Care Service on developing
high care standards and entitlements across Scotland and on workforce
planning to support the recruitment of more, high quality care staff to meet the
growing demand
b. To abandon forthwith those parts of the Bill which take powers and
responsibilities from councils to Ministers and Boards as being highly damaging
and unaffordable
c. To enable the provision of a care service with local delivery, local accountability,
and care users and care staff at its heart
d. To fund Local Authorities fairly and equitably in such a way as to enable them to
deliver key council – and specifically care services – effectively
11
81

Page 82

4.  Update
4.1. The NCS Bill is currently at Stage 1 and the general principles of the National Care
Service are being examined by the Scottish Parliament’s Health, Social Care and
Sport Committee (alongside work being undertaken by other Parliamentary
Committees). 
4.2. The deadline for completion for consideration of the NCS Bill at Stage 1 had been 17
March 2023. This was then extended to 30 June 2023, before being further extended
to 31 January 2024. 
4.3. In June 2023, the Scottish Government reached an initial agreement with local
government and the NHS about accountability arrangements for the NCS. The
agreement aimed to establish who will be responsible for people’s care once the
NCS is established, with overall legal accountability to be shared between Scottish
Government, the NHS and local government. It also included the default position that
local authorities retain legal responsibility for the delivery of social care and social
work functions, as well as retaining staff and assets. 
https://www.cosla.gov.uk/news/2023/partnership-on-national-care-service-published 
4.4. On 7 November 2023, the Health, Social Care and Sport Committee wrote to the
Scottish Government seeking clarity on Scottish Government’s intent with the NCS
Bill and possible amendments they might wish to make in light of the June
agreement reached with COSLA Leaders. A full copy of that letter is available here: 
https://www.parliament.scot/-/media/files/committees/health-social-care-and-sport-
committee/correspondence/2023/ncs-convener-to-minister-november-2023.pdf 
4.5. On 6 December 2023, the Minister for Social Care, Mental Wellbeing and Sport
wrote to the Scottish Parliament’s Health, Social Care and Sport Committee in
response to their Stage 1 scrutiny of the Bill. A full copy of that letter is available
here: 
https://www.parliament.scot/-/media/files/committees/health-social-care-and-sport-
committee/correspondence/2023/national-care-service-minister-response-december-
2023.pdf 
4.6.  On 11 December 2023, Minister for Social Care, Mental Wellbeing and Sport wrote
to the Scottish Parliament’s Finance and Public Administration Committee with the
Scottish Government’s response to the report of 1 December 2022 by the Committee
on the Financial Memorandum for the NCS Bill. A full copy of that letter is available
here: 
https://www.parliament.scot/-/media/files/committees/finance-and-public-
administration-
committee/correspondence/2023/ncsbillfm_ministerscmwstoconvener_11dec23.pdf 
4.7. As agreed by Leaders, COSLA officers have been clear with the Scottish
Government that the complexity of the issues at hand have meant that the
timescales for completing required work and negotiations have remained extremely
challenging. 
4.8. Officers from South Lanarkshire Council have continued to engage with this process
through multiple mechanisms, alongside representative bodies including COSLA. In
doing this, officers have underlined the analysis by Audit Scotland of the significant
funding shortfalls and demand pressures that adult and older people’s social care
are currently facing - as is the situation locally – with unavoidable consequences for
the local provision of services. 
82

Page 83

https://www.audit-scotland.gov.uk/publications/integration-joint-boards-financial-
analysis-202122 
The significant challenges of demand and budget pressures being faced by
children’s social work have also been reiterated. 
4.9. On 17 January 2024, the Scottish Parliament agreed and the Scottish Government
confirmed that consideration of the NCS Bill at Stage 1 would be extended to 1
March 2024. 
5.  Employee Implications 
5.1.  Under the initial agreement referred to at 4.3, staff will continue to be employed by
local authorities. 
5.2. There are no direct employee implications associated with this report. 
6.  Financial Implications 
6.1.  In evidence provided to the Scottish Parliament’s Finance and Public Administration
Committee on 25 January 2024, the Minister for Social Care, Mental Wellbeing and
Sport has stated that planned amendments to the NCS Bill means that the set-up
costs are now estimated by Scottish Government as being between £120m and
£227m over the full 10 years since introduced. 
https://www.parliament.scot/chamber-and-committees/official-report/search-what-
was-said-in-parliament/meeting-of-parliament-25-01-
2024?meeting=15673&iob=133709#orscontributions_M5669E393P730C2554150 
6.2. There are no direct financial implications associated with this report. 
7.  Climate Change, Sustainability and Environmental Implications 
7.1.  There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8.  Other Implications 
8.1 The following is included in the Council’s top risk register as presented to the Risk
and Audit Scrutiny Committee at its October 2023 meeting:- 
 the council is materially affected by the implications arising from the National
Care Service Bill (high risk) 
8.2 The updated risk rating reflects the initial agreement referred to at 4.3 and is
reinforced by the developments since then, as described in this report. 
9.  Equality Impact Assessment and Consultation Arrangements 
9.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2.  There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
5 February 2024 
83

Page 84

Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References 
 22 November 2022 – Motion on NCS to South Lanarkshire Council. 
Background Papers 
 https://www.cosla.gov.uk/news/2023/partnership-on-national-care-service-published
 https://www.parliament.scot/-/media/files/committees/health-social-care-and-sport-
committee/correspondence/2023/ncs-convener-to-minister-november-2023.pdf
 https://www.parliament.scot/-/media/files/committees/finance-and-public-
administration-
committee/correspondence/2023/ncsbillfm_ministerscmwstoconvener_11dec23.pdf
 https://www.audit-scotland.gov.uk/publications/integration-joint-boards-financial-
analysis-202122
 https://www.parliament.scot/chamber-and-committees/official-report/search-what-was-
said-in-parliament/meeting-of-parliament-25-01-
2024?meeting=15673&iob=133709#orscontributions_M5669E393P730C2554150 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Professor Soumen Sengupta - Director of Health and Social Care
E-mail: soumen.sengupta@southlanarkshire.gov.uk 
84