Democracy Spraffa

Agenda Document Pack - Executive Committee - 24/09/2025

South Lanarkshire Council · 24 September 2025
Back to Executive Committee — 24 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 16 September 2025 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 24 September 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Gavin Keatt, Susan Kerr, Ross Lambie,
Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Lesley McDonald, Davie
McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, David Shearer,
Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin Hose,
Cal Johnston-Dempsey, Hugh Macdonald, Kenny McCreary, Elaine McDougall, Mark McGeever,
Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 27 August 2025
submitted for approval as a correct record.  (Copy attached) 
5 - 16 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 5 - 1 April 2025 to 8 August 2025
Report dated 29 August 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
17 - 22 
4 Capital Budget 2025/2026 and Monitoring for Period 5 - 1 April 2025 – 8
August 2025
Report dated 3 September 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
23 - 30 
5 Update to Funding
Report dated 29 August 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
31 - 34 
Item(s) for Decision 
6 Local Action Fund - Further Spend Proposals
Report dated 10 September 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
35 - 40 
7 Visitor Levy
Report dated 9 September 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
41 - 46 
8 Glasgow City Region Investment Zone – Proposed Creation of Non-
Domestic Rates Retention Sites
Report dated 9 September 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
47 - 52 
9 Recommendations Referred by the Finance and Corporate Resources
Committee
Report dated 11 September 2025 by the Chief Executive.  (Copy attached) 
53 - 56 
10  Recruitment Committee - Proposed Amendment to Membership
Report dated 8 September 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
57 - 58 
Item(s) for Noting 
11  Annual Review of the South Lanarkshire Anti-Social Behaviour Strategy
2024 to 2029
Report dated 11 September 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
59 - 66 
2

Page 3

Urgent Business 
12  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 27 August 2025 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Margaret Cooper, Councillor Margaret Cowie (substitute for Councillor Mo
Razzaq), Councillor Maureen Devlin, Councillor Elise Frame, Councillor Celine Handibode (substitute
for Councillor Margaret B Walker), Councillor Cal Johnston-Dempsey (substitute for Councillor
Andrea Cowan), Councillor Gavin Keatt, Councillor Susan Kerr, Councillor Eileen Logan, Councillor
Katy Loudon, Councillor Ian McAllan, Councillor Catherine McClymont, Councillor Lesley McDonald,
Councillor Elaine McDougall (substitute for Councillor Gladys Ferguson-Miller), Councillor Davie
McLachlan, Councillor Richard Nelson, Councillor Norman Rae, Councillor Kirsten Robb, Councillor
John Ross, Councillor David Shearer 
Councillors' Apologies:
Councillor Andrea Cowan, Councillor Gladys Ferguson-Miller, Councillor Ross Lambie, Councillor Mo
Razzaq, Councillor Margaret B Walker 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; K Carr, Head of Facilities, Waste and
Grounds Services
Education Resources
L McRoberts, Executive Director
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; M Milne, Head of Personnel
Services; T Slater, Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
S Egan, Interim Executive Director; C Jardine, Head of Property Services; J Read, Interim Strategy
and Support Manager
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
Chair’s Opening Remarks
The Chair welcomed:- 
 Lyndsay McRoberts, newly appointed Executive Director (Education Resources), to her first
meeting of the Committee
 Councillors Chalmers and Clark in their new roles as Leader and Depute Leader, respectively
of the main Opposition Group 
1 Declaration of Interests 
No interests were declared. 
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 25 June 2025 were submitted for
approval as a correct record. 
In response to a member’s question, the Executive Director (Finance and Corporate Resources)
advised that the costs of the recent storms were still being collated and, as soon as this information
was available, it would be included in a future Revenue Budget Monitoring report. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring for Period 4 - 1 April 2025 to 11 July 2025 
A report dated 30 July 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April to 11 July 2025 and a forecast for the year to 31
March 2026. 
As at 11 July 2025, the projected outturn position on the General Fund Revenue Account and
Housing Revenue Account was a breakeven position, as detailed in appendices 1 and 2 to the
report respectively.  Actual spend to 11 July 2025 was also provided in the appendices to the
report. 
Information was provided on the following key budget areas:- 
 pay award
 Teacher Numbers/Reduced Class Contact Time
 Additional Support for Learning
 Packaging Extended Producer Responsibility 
Councillor Fagan, seconded by Councillor Convery, moved the recommendations in the report,
however, due to additional clarification being required from the Scottish Government on the
Packaging Extended Producer Responsibility (pEPR) funding, proposed the following wording to
replace recommendation (4):- 
“that the anticipated underspend of £7.106 million in core Council budget, as detailed
in section 4.9, be noted and that consideration of its use be taken forward to a future
meeting of the Executive Committee”. 
Councillor Robb, seconded by Councillor Clark, moved the following amendment:- 
Add to section 4.9:- 
“This will result in an underspend of £7.106 million anticipated in the current financial
year and as noted above, given the pressures arising from the higher than budgeted
pay award, it is recommended that £5.006 million be transferred to Reserves, and
consideration given to its use to support the Budget Strategy – with a view to setting
this aside for the cost of the 2025 Pay Award in future years, “retaining £2.100 million
in the Community and Enterprise budget to establish a “Cleaning up South Lanarkshire
Fund” containing the following investments: 
 £1.750m for additional staffing and vehicle resources across Waste and Grounds
Services to provide resilience and tackle litter and fly tipping
 £0.050m for the purchase of more larger, lidded street bins to boost the bin
replacement programme
 £0.250m for environmental enforcement to tackle litter and fly-tipping
 £0.050m to assist communication, including in partnership with 3rd sector
organisations, to increase awareness of opportunities to reuse and recycle 
6

Page 7

The above investments will prioritise but not be limited to town and village centres as
guided by service requirements." 
On a vote being taken using the electronic voting system, 17 members voted for the motion and
11 for the amendment.  The motion was declared carried. 
As part of the discussion, the Chair advised that clarity would be sought from the Scottish
Government in relation to the pEPR funding with a view to holding cross-party discussions to seek
consensus prior to further consideration by Committee. 
The Committee decided: 
(1) that the projected breakeven position on the General Fund Revenue Account for 2025/2026,
as detailed in section 4.1, and the actual spend as at 11 July 2025, as detailed in Appendix
1 of the report, be noted; 
(2) that the available budget of £4.2 million in 2025/2026, as detailed in section 4.5, be
transferred to Reserves, and consideration given to its use to support the Budget Strategy; 
(3) to note that the proposals for the use of £1.8 million Additional Support for Learning (ASL)
funding would be presented to the September meeting of the Committee, as detailed in
section 4.7 of the report; 
(4) that the anticipated underspend of £7.106 million in core Council budget, as detailed in
section 4.9 of the report, be noted and that consideration of its use be taken forward to a
future meeting of the Executive Committee; and 
(5) that the projected breakeven position on the Housing Revenue Account for 2025/2026, and
actual spend as at 11 July 2025, as detailed in section 5 and Appendix 2 of the report, be
noted. 
[Reference: Minutes of 25 June 2025 (Paragraph 4) and Minutes of the Community and
Enterprise Resources Committee of 12 August 2025 (Paragraph 10)] 
Councillor Cooper joined the meeting during consideration of the above item of business 
4 Capital Budget 2025/2026 and Monitoring for Period 4 - 1 April to 11 July 2025 
A report dated 30 July 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April to 11 July 2025. 
The revised programme for the General Fund for 2025/2026 was £73.834 million which included
previous adjustments approved by this Committee.  The revised budget was detailed in Appendix
1 to the report and also included proposed adjustments totalling an overall increase of £5.736
million. 
The forecast for the financial year was £73.834 million and actual spend incurred as at 11 July
2025 totalled £5.276 million.  Actual funding received up to 11 July 2025 was £8.566 million. 
Updates were provided on the:- 
 Delivering and Enabling Commercial Space Programme
 Vacant and Derelict Land Fund  
7

Page 8

The revised Housing Capital Programme for 2025/2026 amounted to £87.700 million.  Programme
funding for the year also totalled £87.700 million.  The funding sources were detailed in Appendix
4 to the report.  Budget for the period amounted to £14.380 million and, as at 11 July 2025,
£14.380 million had been spent. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 to 3
of the report, and the Housing Capital Programme, as detailed in Appendix 4 of the report,
as at 11 July 2025, be noted; 
(2) that the adjustments to the General Fund programme, as detailed in Appendix 1 of the report,
be approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 25 June 2025 (Paragraph 6) and 28 May 2025 (Paragraph 6) and Minutes
of the Community and Enterprise Resources Committee of 12 August 2025
(Paragraph 12)] 
5 Update to Funding 
A report dated 30 July 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on additional funding, totalling £3.272 million, which had been made available to the
Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2025/2026 
(£m) 
Education 1.222 
Social Work 0.587 
Total 1.809 
Capital Funding 
Resource 2025/2026 
(£m) 
Community and Enterprise 1.463 
Total 1.463 
Overall Total 3.272 
The Committee decided: that the report be noted. 
[Reference: Minutes of 28 May 2025 (Paragraph 3)] 
6 Local Action Fund - Further Spend Proposals 
A report dated 30 July 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on further spend proposals for the Local Action Fund (LAF).  
8

Page 9

The allocation of £50,000 to each of the Council’s 20 geographical wards had been approved by
the Council at its meeting on 26 February 2025.  Members had been issued with guidance to
assist in the process of considering how the monies could be spent and were encouraged to
discuss possible suggestions with their fellow ward councillors. 
Proposals for Ward 13 (Cambuslang West), Ward 16 (Bothwell and Uddingston) and Ward 20
(Larkhall) had reached agreement and were attached as Appendix 1 to the report. 
Costings for the proposals on the balance of £23,200 for Ward 11 (Rutherglen South) were being
finalised, and to avoid a decision having to wait until the next meeting of the Committee, it was
proposed that authority be delegated to the Executive Director (Finance and Corporate
Resources), in consultation with the ward members and Chair and Depute Chair of this
Committee, to finalise those proposals. 
Members of Ward 3 (Clydesdale East) were still considering spend options and it was proposed
that their proposal be brought back to a future meeting of the Committee for consideration. 
There were 5 wards where there was more than 1 proposal from ward members. 
The Chair proposed that recommendations 1 to 3 be approved and that for recommendation 4,
each ward be taken individually.  This was accepted by the Committee. 
For Ward 2 (Clydesdale North), Councillor Fagan, seconded by Councillor Convery, moved that
the 1st proposal be approved.  Councillor Chalmers, seconded by Councillor Clark, moved as an
amendment that the 2nd proposal be approved. 
On a vote being taken using the electronic voting system, 16 members voted for the 1st proposal
and 12 for the 2nd proposal.  The 1st proposal, that £50,000 be used for play park improvements
within the ward, was approved. 
For Ward 4 (Clydesdale South), Councillor Fagan, seconded by Councillor Convery, moved that
the 2nd proposal be approved.  This was agreed unanimously.  The 2nd proposal, that £50,000
be allocated as a grant to Blackwood and Kirkmuirhill Resilience Group to support local youth
development, was approved. 
For Ward 5 (Avondale and Stonehouse), the Chair advised that he had received a request from
Councillor Cooper that this be continued to the next meeting.  Councillor Fagan, seconded by
Councillor Convery, moved that the proposals for this ward be continued to the next meeting as it
was understood that there was potential for consensus. 
Councillor Frame, having initially advised that she would want the issue to be considered at this
meeting, agreed for it to be continued on the basis that a meeting of all ward councillors be
arranged to try to reach a conclusion. 
It was, therefore, agreed that the proposals for Ward 5 (Avondale and Stonehouse) be continued
to a future meeting, with a meeting of all ward councillors to be arranged prior to coming back to
committee. 
For Ward 9 (East Kilbride West), Councillor Fagan, seconded by Councillor Convery, moved that
the 1st proposal be approved.  Councillor Robb proposed that the 2nd proposal be approved,
however, failed to find a seconder, therefore, the 1st proposal that £50,000 be used for accessible
play park improvements within the ward was approved. 
At this point in the meeting, Councillors Brown and Cowie, having advised that they would not be
voting on the Ward 12 proposals due to their involvement with Rutherglen 900, left the meeting
during consideration of the Ward 12 proposals.  
9

Page 10

For Ward 12 (Rutherglen Central and North), the Chair advised that he had received a request
from Councillor Lennon that this be continued to the next meeting.  Councillor Fagan, seconded
by Councillor Convery, moved that the proposals for this ward be continued to the next meeting
as there had been progress on the proposals. 
Councillor Loudon, seconded by Councillor Clark, moved as an amendment that the 2nd proposal
be approved. 
On a vote being taken using the electronic voting system, 13 members voted for the motion to
continue the matter and 13 voted for the amendment that the 2nd proposal be approved.  On the
casting vote of the Chair, the motion was declared carried. 
The Committee decided: 
(1) that the proposals for the agreed Local Action Fund (LAF) submissions in respect of Ward
13 (Cambuslang West), Ward 16 (Bothwell and Uddingston) and Ward 20 (Larkhall), as
detailed in Appendix 1 to this report, be approved; 
(2) that authority be delegated to the Executive Director (Finance and Corporate Resources), in
consultation with the ward members and Chair and Depute Chair of this Committee, to
finalise how the LAF would be spent in Ward 11 (Rutherglen South); 
(3) to note that the proposals for Ward 3 (Clydesdale East) would be brought back to a future
meeting; and 
(4) that the following proposals be approved:- 
(a) Ward 2 (Clydesdale North) - £50,000 to be used for play park improvements within the
ward
(b) Ward 4 (Clydesdale South) - £50,000 to be allocated as a grant to Blackwood and
Kirkmuirhill Resilience Group to support local youth development
(c) Ward 5 (Avondale and Stonehouse) - consideration of the proposals for this ward to
be continued to the next meeting of the Committee
(d) Ward 9 (East Kilbride West) - £50,000 to be used for accessible play park
improvements within the ward
(e) Ward 12 (Rutherglen Central and North) - consideration of the proposals for this ward
to be continued to the next meeting of the Committee 
[Reference: Minutes of 25 June 2025 (Paragraph 9)] 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
11:15am and reconvened at 11:20am without the attendance of Councillor Frame 
7 Administration and Approval of Firework Control Zones in South Lanarkshire 
A report dated 28 July 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted:- 
 providing an update on the requirements of Firework Control Zones from the Fireworks and
Pyrotechnic Articles (Scotland) Act 2022
 seeking approval for the proposed approval processes relating to Firework Control Zones 
The Fireworks and Pyrotechnic Articles (Scotland) Act 2022 introduced a range of restrictions and
requirements on the use of fireworks across Scotland.  This included stricter criteria on who could
buy and sell fireworks, and how and when they could be used.  
10

Page 11

A key aspect of the legislation was the introduction of discretionary powers for local authorities to
designate Firework Control Zones (FCZs).  This was followed up by local authority guidance
published in 2024. 
Information was provided on the proposed approval processes for FCZs in South Lanarkshire,
which included how they could be applied for, public consultation and approval through the
Council’s area committees.  If approved, area committees’ Terms of Reference would require to
be updated and approved by Council. 
The Interim Strategy and Support Manager, Housing and Technical Resources responded to
members’ questions and undertook to provide members with information on:- 
 what constituted an established community group
 any restrictions on the sale of fireworks within FCZs 
The Committee decided: 
(1) that the overview of the requirements of the Fireworks and Pyrotechnic Articles (Scotland)
Act 2022 be noted; and 
(2) that the proposed approval processes for Firework Control Zones in South Lanarkshire, as
detailed in Section 6 of the report, be approved. 
8 Consultation on the Scottish Fire and Rescue Service’s Service Delivery Review 
A report dated 7 August 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted:- 
 providing an update on the Scottish Fire and Rescue Service’s public consultation on the
strategic review of its Service
 seeking approval for the Council’s proposed response to the consultation 
Information was provided on:- 
 the background to the consultation which followed a national Service Delivery Review and
previous consultation exercise
 the current operating arrangements in Lanarkshire
 the conclusions from the Service Delivery Review specific to Lanarkshire which resulted in
2 options 
The response to the consultation, which was attached as Appendix 1 to the report and informed
by a members’ awareness session held on 6 August 2025, chose option 2 as the preferred mode
of service delivery for Lanarkshire. 
The Committee decided: 
(1) that the overview of the Scottish Fire and Rescue Services’ Service Delivery Review be
noted; and 
(2) that the proposed response to the consultation, attached as Appendix 1 to the report, be
approved. 
9 Land and Property Transfers and Disposals 
A report dated 30 July 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted on proposed actions in respect of land and property transactions.  
11

Page 12

The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
The Committee decided: that the land detailed in Appendix A, which would be the
subject of negotiated transactions, be declared surplus to
Council requirements. 
10 South Lanarkshire Local Housing Strategy Annual Review 2024/2025 
A report dated 6 August 2025 by the Interim Executive Director (Housing and Technical
Resources) was submitted providing an update on the progress made during 2024/2025 against
the agreed outcomes set out in the Local Housing Strategy (LHS) 2022 to 2027. 
A summary of significant changes, which had taken place both nationally and locally since the last
review of the LHS, was provided in the report. 
The LHS was structured around 5 chapters and 8 priority outcomes and was monitored through
106 indicators, comprising 71 actions and 35 measures, which showed that:- 
 2 indicators had been completed in full
 80 indicators were categorised as green and were on course to achieve with no issues
anticipated
 10 indicators were categorised as amber with some minor slippage against targets
 1 indicator was categorised as red with below anticipated performance
 13 indicators would be reported at a later date 
Actions to address the red and amber indicators were outlined in the report together with highlights
in areas where good progress had been identified.  In line with trends across Scotland, South
Lanarkshire continued to experience a Housing Emergency with sustained demand for
homelessness services. 
As well as providing the opportunity to assess and report on the progress made against each of
the actions and measures contained in the Strategy, the annual review also allowed for a general
re-examination to ensure that the objectives, actions and measures identified remained
appropriate, relevant and measurable.  During the annual review, 5 proposed revised actions had
been identified, as detailed in the report.  Those would be incorporated in the LHS action plan for
2025/2026. 
The Committee decided: that the progress on actions for delivering the agreed LHS
priority outcomes across the 5 chapters be noted. 
[Reference: Minutes of 26 June 2024 (Paragraph 15)] 
11 South Lanarkshire Council Response to Pre-budget Scrutiny Call for Views on
Responding to Long-Term Fiscal Pressures 
A report dated 5 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the Council’s response to the call for views issued by the Finance and Public
Administration Committee of the Scottish Parliament as part of the pre-budget scrutiny process. 
The call for evidence had been issued on the topic of ‘Responding to Long-Term Fiscal Pressures’
and information was provided on the focus of this year’s pre-budget scrutiny. 
The Council’s response, which had been due for submission by 11 August 2025, was attached as
Appendix 1 to the report.  
12

Page 13

The Committee decided: that the Council's response to the call for views, attached as
Appendix 1 to the report, be noted. 
12 Care Reform (Scotland) Act 2025 – Update 
A report dated 15 August 2025 by the Director, Health and Social Care was submitted providing
an update on the Care Reform (Scotland) Act 2025 which received Royal Assent on 22 July 2025. 
Information was provided on the background to the establishment of the Act which had initially
been put forward as The National Care Service (Scotland) Bill.  Following amendments at Stage
2 of the approval process for legislation, the name of the Bill had been changed as it was no longer
establishing a National Care Service. 
In summary the Act:- 
 enshrined Anne’s Law into legislation to uphold the rights of people living in adult care homes
to see loved ones and identify an essential care supporter
 strengthened support for unpaid carers by establishing a legal right to breaks
 empowered people to access information on their care and improved the flow of information
across care settings
 improved access to independent advocacy to guarantee people were heard and involved in
decisions about their own care
 created a National Chief Social Work Adviser role to provide professional leadership and
champion the sector, as part of plans for a new National Social Work Agency 
A non-statutory advisory board would be established to drive progress and scrutinise reform. 
The Committee decided: that the update on the Care Reform (Scotland) Act 2025 be
noted. 
[Reference: Minutes of 21 February 2024 (Paragraph 11)] 
13 Good Food Nation Plan and Call for Evidence 
A report dated 30 July 2025 by the Chief Executive was submitted providing:- 
 an update on the upcoming Scottish Government guidance on the development of a Good
Food Nation Plan (GFNP) and current progress
 the Council’s response to the Scottish Parliament’s call for evidence on the Good Food
Nation Plan, which was submitted to meet the deadline of 15 August 2025 
The Good Food Nation (Scotland) Act 2022 placed a legislative duty on Scottish Ministers, local
authorities and territorial health boards to create GFNPs.  The Scottish Government was in the
process of preparing a national GFNP, which would be finalised during 2025. 
Information was provided on the key dates and considerations for the development of GFNPs,
together with preparatory actions being taken by the Council. 
A call for evidence was issued by the Scottish Parliament’s Health, Social Care and Sport
Committee and Local Government, Housing and Planning Committee, with a deadline for
responses of 15 August 2025.  The Council’s response was attached as Appendix 1 to the report.  
13

Page 14

The Committee decided: 
(1) that the content of the report be noted; and 
(2) that the Council’s response to the call for evidence, attached as Appendix 1 to the report, be
noted. 
14 Council Complaints Report: SPSO Annual Overview 2024/2025 
A report dated 6 August 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing details on:- 
 the Council’s performance in handling complaints received during the period 1 April 2024 to
31 March 2025 against the Scottish Public Services Ombudsman’s (SPSO) national
indicators
 customer feedback on complaints handling 
The Committee decided: that the Council’s complaints handling performance for the
period 1 April 2024 to 31 March 2025 be noted. 
[Reference: Minutes of 4 September 2024 (Paragraph 8)] 
15 Membership Changes 
A report dated 13 August 2025 by the Chief Executive was submitted advising of a change to the
membership of the Community Wealth Building Commission and the Conference Allocation
Committee. 
Following recent changes to the office bearers in the SNP Group and to comply with the
associated Terms of Reference, Councillor Chalmers, as Leader of the Group, had replaced
Councillor Ross on the Community Wealth Building Commission and Councillor Clark, as Depute
Leader of the Group, had replaced Councillor Chalmers on the Conference Allocation Committee. 
The Committee decided: 
(1) that the replacement of Councillor Ross by Councillor Chalmers as a member of the
Community Wealth Building Commission be noted; and 
(2) that the replacement of Councillor Chalmers by Councillor Clark as a member of the
Conference Allocation Committee be noted. 
[Reference: Minutes of South Lanarkshire Council of 18 May 2022 (Paragraph 7)] 
16 Urgent Business 
There were no items of urgent business. 
14

Page 15

17 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act. 
18 Langlands West – Marketing for AI/Data Centre Opportunity 
A report dated 6 August 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on:- 
 the Data Centre/AI market
 a marketing exercise carried out in relation to the Council owned site at Langlands West and
the steps taken to market it as a Data/AI Centre opportunity 
The Head of Enterprise and Sustainable Development responded to members’ questions in
relation to various aspects of the report. 
The Committee decided: 
(1) that work to conclude an offer to purchase the Langlands West Site continue, as outlined in
section 6 of the report; and 
(2) that authority be delegated to the Executive Director (Community and Enterprise
Resources), in consultation with Executive Director (Housing and Technical Resources) and
the Head of Administration and Legal Services, to progress matters and conclude a sale
contract on terms that were in the best interests of the Council. 
Councillor Nelson left the meeting during consideration of the above item of business 
15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 5 - 1 April 2025
to 8 August 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the forecast for the year to 31 March 2026 for the
Council’s General Fund Revenue Account and Housing Revenue Account, and
the actual spend position for the period 1 April 2025 to 8 August 2025
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2025/2026 (section 4.1) and the actual spend as at 8 August 2025
(Appendix 1), be noted;
(2) that the update on the use of the Additional Support for Learning funding
(section 4.4), be noted; and
(3) that the projected break-even position on the Housing Revenue Account for
2025/2026, and the actual spend as at 8 August 2025 (section 5 and
Appendix 2), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2025/2026 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section
5).  It will also provide the actual spend as at 8 August 2025. 
4. General Services 2025/2026 Projected Outturn as at 8 August 2025
4.1. As at 8 August 2025, the projected outturn position for 2025/2026 on the General
Services budget is break-even (Appendix 1).  The actual spend to date is shown in
Appendix 1. 
4.2. Section 4.3 onwards provides detail on a number of key budget areas.  
3
17

Page 18

4.3. Reduced Class Contract Time:  As reported previously, if implemented, there is
still a risk in relation to Reducing Class Contact Time (RCCT) for teachers, and
national discussions on this are ongoing. Reducing the amount of time that a teacher
is in the classroom would mean a requirement for additional teachers to be brought
into the system. This would have financial implications for councils including South
Lanarkshire Council. Cosla and local government are engaged with the Scottish
Government on this matter, and local government have made it clear that funding
would have to be provided by the Scottish Government. If the Scottish Government
do not fully fund the cost of RCCT, then this shortfall will be added to the Council’s
Budget Gap and further savings would be required to balance the Council’s Budget.
Updates will be provided as this matter progresses. 
4.4. Additional Support for Learning (ASL): As previously advised, Education
Resources has considered spend areas for the use of the Additional Support for
Learning funding allocation of £1.834 million in 2025/2026.  In line with identified
need across schools and establishments, proposed spend areas include a Pedagogy
Team, Data Officer, Pathfinders, Marmot Early Years Support, Early Years
Language and Communication Project, and Speech and Language provision.  A
separate report will be presented to the Education Resources Committee in
November outlining the full details of the proposals and the additional posts required.
4.5. Pay Award: National agreement has now been reached on the pay award for
Scottish Joint Council (SJC), Craft Operatives and Chief Officials on the basis of a
4% uplift in 2025/2026 and 3.5% in 2026/2027. The 2025/2026 uplift was paid in
August 2025 and the budget allocation to Resources is included in the position
reflected in Appendix 1. 
4.6. Discussions on the pay offer for Teachers are ongoing and being considered by the
Scottish Negotiating Committee for Teachers (SNCT) Teachers Panel. Updates will
be provided as further information becomes available. 
4.7. Transfers from Capital: The Budget in Appendix 1 includes a £5.300 million transfer
from the Capital Programme for the Private Housing Scheme of Assistance (£1.000
million) and Planned Maintenance (£4.300 million) programmes. Following a review of
the spend, it has been identified that it cannot be classed as Capital. Therefore, it is
proposed that budget of £5.300 million will be transferred to Housing and Technical
Resource’s Revenue budget. This is an accounting transaction only. The total overall
budget for the projects remains the same.  
5. Housing Revenue Account Position
5.1. As at 8 August 2025, Appendix 2 of the report shows a break-even position on the
Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report.  
18

Page 19

9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in
this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
29 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
19

Page 20

Note:  While the Year to Date Actual at period presents a net surplus position (£40.802m), this is timing only.  The forecast outturn shows
a breakeven position (sections 4.1).
Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 136.550 136.550 0.000 0.00% 39.935
Facilities Waste and Grounds 85.378 85.112 0.266 0.31% 21.764
Leisure and Culture 20.090 20.090 0.000 0.00% 8.464
Planning and Regulatory Services 5.223 5.100 0.123 2.35% 1.412
Enterprise and Sustainable Development 6.556 6.394 0.162 2.47% 2.656
Roads, Transportation and Fleet 19.303 19.854 (0.551) (2.85%) 5.639
Education Resources 495.033 495.033 0.000 0.00% 165.477
Education 495.033 495.033 0.000 0.00% 165.477
Finance and Corporate Resources 41.678 41.678 0.000 0.00% 22.690
Finance Services - Strategy 2.177 2.268 (0.091) (4.18%) 1.232
Finance Services - Transactions 17.920 17.715 0.205 1.14% 8.394
Audit and Compliance Services 0.363 0.332 0.031 8.54% 0.163
Information Technology Services 8.055 8.142 (0.087) (1.08%) 6.957
Communications and Strategy Services 2.395 2.378 0.017 0.71% 1.099
Administration and Licensing Services 4.093 4.068 0.025 0.61% 2.280
Personnel Services 6.675 6.775 (0.100) (1.50%) 2.565
Housing & Technical Resources 19.239 19.239 0.000 0.00% 10.053
Housing Services 8.967 9.003 (0.036) (0.40%) 4.496
Property Services 10.272 10.236 0.036 0.35% 5.557
Social Work Resources 251.772 251.772 0.000 0.00% 103.303
Performance and Support Services 6.197 6.173 0.024 0.39% 2.069
Children and Families 51.786 52.034 (0.248) (0.48%) 17.481
Adults and Older People 192.908 192.908 0.000 0.00% 83.317
Justice and Substance Misuse 0.881 0.657 0.224 25.43% 0.436
Joint Boards 1.629 1.629 0.000 0.00% 0.627
945.901 945.901 0.000 0.00% 342.085
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 945.901 945.901 0.000 0.00% 342.085
CFCR 1.310 1.310 0.000 0.00% 0.000
Loan Charges 37.249 37.249 0.000 0.00% 0.000
Corporate Items 6.476 6.476 0.000 0.00% 0.220
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Total Expenditure 1,022.344 1,022.344 0.000 0.00% 342.305
Council Tax 196.599 196.599 0.000 0.00% 75.615
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (9.529)
171.823 171.823 0.000 0.00% 66.086
General Revenue Grant 453.144 453.144 0.000 0.00% 174.286
Non Domestic Rates 371.110 371.110 0.000 0.00% 142.735
Transfer from Reserves 26.267 26.267 0.000 0.00% 0.000
Total Income 1,022.344 1,022.344 0.000 0.00% 383.107
Net Expenditure 0.000 0.000 0.000 0.00% (40.802)
Period Ended 8 August 2025 (No.5)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
20

Page 21

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 15.360 15.171 0.189 1.23% 1 5.220
Property Costs 59.585 59.597 (0.012) (0.02%) 16.339
Supplies and Services 2.369 2.382 (0.013) (0.55%) 0.199
Transport and Plant 0.195 0.195 0.000 0.00% 0.035
Administration 5.594 5.649 (0.055) (0.98%) 0.213
Payment to Other Bodies 3.271 3.323 (0.052) (1.59%) 0.849
Payment to Contractors 0.100 0.100 0.000 0.00% 0.054
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 34.875 34.875 0.000 0.00% 10.246
Total Controllable Exp. 121.349 121.292 0.057 0.05% 33.155
Total Controllable Inc. (133.968) (133.968) 0.000 0.00% (39.546)
Transfer to/(from) Balance Sheet (4.001) (3.944) (0.057) 1.42% 0.000
Net Controllable Exp. (16.620) (16.620) 0.000 0.00% (6.391)
Loan Charges 16.620 16.620 0.000 0.00% 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (6.391)
Variance Explanations
1. Employee Costs
The underspend in employee costs is due to vacancies within the service that continue to be actively recruited.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 8 August 2025 (No.5)
Housing Revenue Account
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2025/2026 and Monitoring for Period 5 -
1 April 2025 – 8 August 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2025 to 8
August 2025 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r
(1) that the position of the General Fund Capital Programme (Appendices 1 to 3)
and the Housing Capital Programme (Appendix 4), as at 8 August 2025, be
noted;
(2) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 8 August 2025 (period 5).  Spending has been split into two separate sections below: 
 General Fund Capital Programme inc. Education, Social Work, Roads and
General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme
4.1. 2025/2026 Budget: The revised programme for the General Fund is £69.932 million
(summarised in Appendix 2).  This revised programme consists of the base budget
plus carry forward projects and adjustments which have been agreed by the Executive
Committee up to and including its meeting on 27 August 2025. 
4.2. The programme of £69.932 million also includes proposed adjustments totalling an
increase of £1.398 million.  These are detailed in Appendix 1.  
4
23

Page 24

4.3. Transfers to Revenue:  In addition to the adjustments noted at Section 4.2, the
revised programme of £69.932 million also reflects a £1.000 million transfer to the
Revenue Budget for the Private Housing Scheme of Assistance project and £4.300
million for Planned Maintenance.  To reflect Accounting Regulations, this spend
cannot be classed as Capital.  Therefore, it is proposed that budget of £5.300 million
will be transferred to Housing and Technical Resource’s Revenue budget. 
4.4. Capital expenditure can be funded by Revenue monies, however, Revenue spend
cannot be paid for from Capital funding.  The Council’s Capital programme includes
funding that can be used for Revenue spend.  We are, therefore, able to move funding
between the Capital and Revenue Programmes and deliver the project as planned. 
This is an accounting transaction only. 
4.5. The funding available of £69.932 million to support the programme is detailed in
Appendix 3. 
4.6. 2025/2026 Forecast:  As noted in 4.1, the total capital spending programme for the
year is £69.932 million. 
4.7. Appendix 3 also shows a forecast for the financial year of £69.884 million. 
4.8. 2025/2026 Actual Position:  Actual spend incurred to the 8 August 2025 totals
£8.041 million. 
4.9. Actual funding received to 8 August 2025 is £10.824 million.  This is shown in Appendix
3. Relevant officers will continue to closely monitor the generation of all income
including receipts. 
5. Housing Programme
5.1. 2025/2026 Budget:  Appendix 4 summarises the position on the Housing programme
as at 8 August 2025.  As reported previously, the total Housing Capital programme for
the year is £87.700 million. 
5.2. 2025/2026 Forecast:  As noted in 5.1, the total capital spending programme for the
year is £87.700 million.  Current estimates from Resources have identified an outturn
of £87.700 million for the year. 
5.3. 2025/2026 Actual Position:  Spend to 8 August 2025 on the Housing Capital
Programme amounts to £19.032 million. 
5.4. As at 8 August 2025, £19.032 million of funding had been received. 
5.5. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. None 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.  
24

Page 25

8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 26 February 2025
 Executive Committee, 27 August 2025 
List of Background Papers
 Capital Ledger prints to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
25

Page 26

APPENDIX 1
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 8 AUGUST 2025 
Proposed Adjustments 
Community and Enterprise Resource 
Bus Infrastructure Fund
Transport Scotland have agreed the 2025/2026 distribution of £10 million funding for
the design, development and delivery of bus infrastructure measures.  This will be
used for equipment installation in buses and traffic signals to improve bus prioritisation
and Roads are in communication with bus companies to identify problem locations.
The grant is payable directly via the General Capital Grant. 
Approval is sought to increase the capital programme by £0.648 million 
Road Safety Improvement Fund
Transport Scotland have awarded South Lanarkshire Council £0.737 million in
connection with the Road Safety Improvement Fund for 2025/2026.  Roads have
identified the below listed projects, based upon casualty reduction priorities as
reported to the Road Safety Forum in May 2025. 
• A721 Newbigging to Elsrickle
• B743 Strathaven to Council boundary
• Road Trace Software
• A70 Rigside to Hyndford
• A730 Mill Street at Main Street/ Burnhill Street signalised junction, Rutherglen   
• A724 Main Street at/near Bridge Street, Cambuslang
• B764 Eaglesham Road at Westwood Road roundabout, East Kilbride
• SLC Road Safety Vehicle Pilot   
Approval is sought to increase the capital programme by £0.737 million.  Of this,
£0.550 million is profiled to spend in 2025/2026 with the remaining £0.187 million
slipped into 2026/2027. 
Cycling Scotland Grant Award 
Additional funding has been awarded to the Council by Cycling Scotland for new
cycle storage and shelter repairs at schools. 
Approval is sought to increase the capital programme by £0.123 million.  Of this
£0.100 million is profiled to spend in 2025/2026 with the remaining £0.023 million
slipped into 2026/2027. 
£0.648m 
£0.737m
(£0.187m) 
£0.123m
(£0.023m) 
26

Page 27

APPENDIX 1 (cont) 
Leisure and Culture Transformation Fund
Chatelherault Country Park:  The Executive Committee (13 November 2024)
approved an allocation of £0.3 million of the Leisure and Culture Transformation
Fund to upgrade the toilets and / or the café at Chatelherault Country Park.  As there
are plans to relocate the café via a franchise at a later date (within the Country Park
Masterplan), the café refurbishment works will not be undertaken within the
Transformation Programme, and instead the work will be focussed on the toilet
refurbishment.  It is anticipated that there will be a potential underspend of £0.070
million on the toilets project, and when confirmed, will be added to the contingency
for the overall programme.   
Hamilton Water Palace:  The Hamilton Water Palace Passenger Lift has required
ongoing repairs, and it is recommended that the lift be replaced.  Surveys have been
undertaken and the cost to replace the lift is £0.087 million, and it is proposed that
this could be funded from the remaining contingency for the overall programme. 
Approval is therefore sought to reallocate £0.087 million from the Leisure and
Culture Transformation Fund contingency budget in 2025/2026. 
Education Resources 
Calderside Academy Improvements
The programme of works includes the demolition of a derelict building to improve
external teaching facilities, creating room for future building expansion, improved ICT
facilities within the library, provision of a dedicated ASN garden and practical
workshops for the Calderside Learning Community. 
Approval is sought to increase the capital programme by £0.280 million funded
through Developers Contributions.  Of this, £0.100 million is required in 2025/2026 in
line with profiled spend and the remaining £0.180 million will therefore be slipped into
2026/2027.   
£0.000m 
£0.000m 
£0.280m
(£0.180m)  
TOTAL ADJUSTMENTS £1.398m 
27

Page 28

APPENDIX 2 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 8 AUGUST 2025 
£m  
Total Base Budget (including carry forward from 2024/2025)  68.534 
Proposed Adjustments – Period 5 1.398  
Total Revised Budget  69.932   
2025/26 Budget  Period 5
Proposed
Adjustments
Revised 
2025/26 
Budget 
Resource  £m £m £m
Community & Enterprise 56.168 1.298 57.466
Education 5.970 0.100 6.070
Finance & Corporate 0.545 - 0.545
Housing & Technical 5.514 - 5.514
Social Work 0.337 - 0.337
TOTAL CAPITAL PROGRAMME 68.534 1.398 69.932 
28

Page 29

APPENDIX 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 8 AUGUST 2025 
2025/26
Original
Estimate
inc C/F 
2025/26
Revised
Budget 
2025/26
Forecast 
Spend 
2025/26
Forecast
Variance 
2025/26
Actual to
08/08/25      
Expenditure £m £m £m £m £m      
General Fund Programme 64.188 69.932 69.884 - 8.041 
Income
2025/26
Budget
2025/26
Revised
Budget  
2025/26
Actual
To
08/08/25         
£m         £m   £m
Prudential Borrowing 17.192 21.602   0.000
Developers Contributions 1.965 4.818   0.000
Partners  0.450 2.872   0.155
Scottish Government:     
- Capital Grant 27.467 28.115   9.156 
- Vacant & Derelict Land 1.477 1.502   0.994 
- Place Based Investment  0.589 0.589   0.014
Levelling Up Fund 7.700 7.700   0.004
Capital Receipts 0.700 0.700   0.501
Specific Reserves 0.038 0.724   0.000
Revenue Contribution 6.610 1.310   0.000      
TOTAL FUNDING 64.188 69.932   10.824  
29

Page 30

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26       
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 8 AUGUST 2025 
2025/26
Annual 
Budget  
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26
Actual to
08/08/25 
£m £m £m £m
Expenditure 
2025/26 Budget  87.700  87.700  -  19.032     
2025/26
Annual 
Budget  
2025/26
Actual to
08/08/25 
£m   £m
Income         
Capital Funded from Current Revenue 35.633   10.246
Prudential Borrowing 26.948   3.963
Scottish Government Specific Grant:    
- New Build 18.839   3.628
- Open Market Purchase Scheme 6.000   1.068
- Mortgage to Rent 0.120   0.000
Climate Emergency Fund 0.160   0.000
Other Income 0.000   0.127 
87.700   19.032 
30

Page 31

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (27 August 2025)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £1.654 million, detailed in appendices1 and 2,
be noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in appendices 1 and 2 of the report. The
report details additional funding that has been reported by Resources as part of the
additional resources’ notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £0.146 million has been identified for 2025/2026. This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £1.508 million has been identified for 2025/2026. This is
detailed in Appendix 2. 
5.3. The total additional funding is therefore, £1.654 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval.  
5
31

Page 32

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
29 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
32

Page 33

Appendix 1 
Additional Revenue Funding  
Resource  Description  2025/2026
£m 
Total
£m 
Method
Community
& Enterprise
Free School Meals – Test of change to
those in receipt of Scottish Child
Payments in S1 to S3 
To support the delivery of free school meals
to those in receipt of Scottish Child Payment
in S1 to S3 in Scotland. This Test of Change
Phase is to be delivered in 4 Secondary
schools: Calderglen High School, Trinity High
School, Lesmahagow High School and
Larkhall Academy. 
0.146 0.146 Scottish
Government 
TOTAL REVENUE FUNDING 0.146 0.146 
33

Page 34

Appendix 2 
Additional Capital Funding 
Resource  Description  2025/2026
£m 
Total
£m 
Method
Community &
Enterprise
Bus Infrastructure Fund 
Transport Scotland have agreed the
2025/2026 distribution of £10 million
funding for the design, development and
delivery of bus infrastructure
measures.  This will be used for
equipment installation in buses and
traffic signals to improve bus
prioritisation and Roads are in
communication with bus companies to
identify problem locations. 
0.648 0.648 Transport
Scotland  -
General Capital
Grant
Community &
Enterprise
Road Safety Improvement Fund 
Transport Scotland have awarded South
Lanarkshire Council £0.737 million in
connection with the Road Safety
Improvement Fund for 2025/2026. 
Roads have identified projects, based
upon casualty reduction priorities, as
reported to the Road Safety Forum in
May 2025. 
0.737 0.737 Transport
Scotland
Community &
Enterprise
Cycling Scotland Grant Award 
Cycling Scotland have awarded the
Council funding of £0.123 million in
2025/2026 for new cycle storage and
shelter repairs at schools. 
0.123 0.123 Cycling
Scotland 
TOTAL CAPITAL FUNDING 1.508 1.508 
34

Page 35

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Local Action Fund – Further Spend Proposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise, and seek the approval of the Committee in respect of, the proposals in
relation to the Local Action Fund spend of £50,000 in each of the Council’s 20
geographical Wards which have not yet been approved by the Committee
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the proposals for the agreed Local Action Fund (LAF) submissions in
respect of Ward 5 (Avondale and Stonehouse), as detailed in Appendix 1 to
this report, be approved; and 
(2) that as there is more than one proposal for two Wards, as detailed in Appendix
2 to this report, consideration be given and a decision taken to approve a
proposal for each of the following Council Wards: 
(a)  Clydesdale East (Ward 3); and
(b)  Rutherglen Central and North (Ward 12). 
3. Background
3.1. As part of the Budget Amendment approved by Council on 26 February 2025, it was
agreed that £50,000 would be provided for each of South Lanarkshire’s 20 Wards to
be approved by the Executive Committee, following input from local councillors. 
3.2. As previously reported to this Committee on 25 June 2025 and 27 August 2025,
Members were issued with guidance to assist in their process of considering how to
spend the monies in their local ward.  Councillors were encouraged to discuss
possible suggestions with their fellow ward councillors and, if able, agree a single
suggestion for their ward. A form was also issued to Members to complete with their
spend proposals, and a timeline was set for these proposals to be submitted, to allow
time for officer consideration/input to ensure the project was deliverable, before
collating them into a summary for consideration by this Committee. 
3.3. On 25 June, the Committee approved Local Action Fund proposals for 13 Council
Wards, and on 27 August approved proposals for a further 4 Wards. This report now
provides an update on the proposals for the remaining 3 Wards. 
6
35

Page 36

4. Ward Specific Proposals for Approval
4.1. There is one Ward where there is an agreed proposal from the Ward Members.  This
is detailed in Appendix 1, and relates to Avondale and Stonehouse (Ward 5).   
4.2.  The Committee is asked to approve the agreed proposals in Appendix 1. 
4.3.  There are two wards where there is more than one proposal from Ward Members for
the use of the Local Action Fund. These are detailed in Appendix 2. The Committee is
asked to consider the submissions and approve a proposal for each Ward. 
4.4. Members’ attention is drawn to one proposal for Ward 12, Rutherglen Central and
North.  One of the proposals is that the Local Action Fund be used towards the
provision of a public toilet at Overtoun Park. As reported to the Committee in August,
discussions are still ongoing in respect of a local comfort scheme being established
in the vicinity, supported by a local community group. Such a scheme would not
require the full £50,000 available to Ward 12, but as those discussions are ongoing,
the cost has not yet been finalised. A verbal update will be provided at the
Committee meeting. 
4.5. Where proposals have been agreed by Committee, they have been added to the
programme of spend for the current year, to be taken forward for implementation by
officers in the normal way. Where grants to third party organisations have been agreed
they have likewise been taken forward by officers, in line with existing procedures for
the issuing of grants. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. As detailed in section 4 of the report, each Ward has been allocated £50,000, a total
of £1.0 million for all 20 Wards. 
6.2. As part of this paper, an agreed proposal has been identified for 1 Ward totalling
£50,000. This is included in Appendix 1 for approval. 
7. Climate Change, Sustainability and Environmental Implications
7.1. Any implications for climate change, sustainability or the environment from the
proposals included in Appendix 1 are anticipated to be minimal. 
8. Other Implications
8.1. A risk associated with spend on the Ward proposals is that there is an overspend. The
risk has been assessed as low given the detailed budget management applied across
the Resources and projects.  The risk is managed through financial monitoring
arrangements at which any variance is analysed. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report.  
36

Page 37

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
10 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council – 26 February 2025
 Executive Committee - 25 June 2025
 Executive Committee - 27 August 2025 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Iain Strachan, Head of Administration and Legal Services
Ext:  4658 (Tel:  01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk
37

Page 38

Appendix 1
Agreed Local Action Fund Submissions 
Ward
No
Ward Name Proposed use of Local Action Fund
5 Avondale and
Stonehouse 
All members have agreed the proposal that the £50,000 be shared as follows:- 
• Friends of Stonehouse Park - £12,000 to purchase a generator to be
used for community events;
• Strathaven Rugby Club - £20,000 towards the renewable energy system
to form part of the new multi-sports facility proposed by the club;
• Targeted improvements to public spaces across the ward, which might
include renovation/purchase of benches and installation of bird proof litter
bins - £8,000;
• Play Park Improvements - £10k towards play park improvements in the
ward, including accessible play park equipment, with Ward members to
be consulted on where this additional funding is to be spent. 
38

Page 39

Appendix 2
Wards with more than one Local Action Fund Proposal 
Ward
No
Ward Name Proposed use of Local Action Fund
3 Clydesdale
East
There are two proposals. 
The first proposal is that £50,000 be used to award a grant of £5,000 to each of
the following 10 active Community Councils within the Ward
• Blackmount
• Carnwath
• Carstairs
• Pettinain
• Quothquan & Thankerton
• Biggar
• Carmichael
• Symington
• Duneaton
• Leadhills 
The second proposal is that £50,000 be used to award a grant of £5,000 to each
of
• Sustainable Pettinain SCIO (Petttinain Hall)
• Soul of the Junction SCIO (Carstairs Junction Hall)
• Carstairs Community Centre (Carstairs Village)
• Ravenstruther &Cleghorn Hall Association
• Quothquan Village Hall
• Wiston Village Hall
• Dolphinton Hall Community Association
• Crawfordjohn Public Hall Association
• Elsrickle Community Hub
• Biggar Youth Project 
12 Rutherglen
Central and
North 
There are two proposals. 
The first proposal is for the funding to be used towards the provision of an
accessible toilet facility in Overtoun Park (£50,000). 
The second proposal is to split the funds between the following recipients:
• Universal Connections (£12,000), 
• The High Backs (£7,000 to the men’s group and £4,000 to the after-
school club. Total of £11,000), 
• Rutherglen 900 for community projects (£10,000), 
• £5,000 for each of the three primary schools, Bankhead, Burgh and St
Columbkille’s (£15,000), and
• Rutherglen Community Carers (£2,000). 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Community and Enterprise
Resources) 
Subject: Visitor Levy 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide an update on the current opportunities and implications of introducing a
visitor levy in South Lanarkshire 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the potential implications and opportunities a visitor levy could present for
South Lanarkshire be noted, and
(2) that the next steps, as set out in Section 8, be approved. 
3. Background
3.1. The Scottish Government has granted local authorities the power to introduce a visitor
levy, aiming to generate additional revenue for local authorities to reinvest in tourism-
related services and infrastructure. As a result, an expert group has been formed made
up of stakeholders reflecting tourism, business, and local government, to deliver
statutory guidance for all local authorities on the visitor levy. 
3.2. It will be for each local authority to decide, after consultation, whether or not to
introduce a visitor levy scheme. If a levy is introduced, it will be charged on the
purchase of overnight accommodation at a percentage rate. Accommodation
providers will be responsible for collecting and remitting a levy and local authorities
can determine elements such as the percentage rate, geographical area and local
exemptions, however, there are also some mandatory exemptions listed within the
official guidance. Some examples of those who would be exempt from paying a levy
are those who use overnight accommodation as their only primary residence or those
in receipt of specific disability benefits, payments or allowances. 
3.3. The commencement of a visitor levy scheme must be at least 18-months from the date
a local authority formally decides to proceed to introduce a visitor levy in their area. 
3.4. Some local authorities have expressed interest in implementing a visitor levy, citing its
potential to support sustainable tourism and infrastructure development. Meanwhile,
others remain cautious, focusing on industry concerns and the administrative burden.  
7
41

Page 42

4. Approach by Local Authorities Across Scotland
4.1. Several local authorities have agreed to proceed with the introduction of a visitor levy,
including Edinburgh and Glasgow City Councils. Other local authorities are
undertaking formal consultation, with reports being presented to relevant committees
later this year. 
4.2. North Lanarkshire Council has established a Visitor Levy Working Group and is
proposing to hold an industry information session this Autumn. 
4.3. As part of the consultation process, councils are giving consideration to how funds
may be spent, including: 
 operations and infrastructure
 culture, heritage and events, and
 destination and visitor management 
5. South Lanarkshire Council’s Potential Revenue
5.1. Glasgow City Region Intelligence Hub was instructed to conduct research on the
impact a visitor levy would have on the region using CoStar as the primary source of
accommodation revenue and occupancy estimates. 
5.2. Based on a range of levy scenarios between 2.5%-7.5% it has been projected that the
levy could generate between £0.8m to £2.5m per annum in South Lanarkshire. 
5.3. It is, however, considered that this is a conservative estimate as these figures are
based on the number of accommodation providers registered with the CoStar platform
only and, therefore, does not capture smaller accommodation providers.  This has
been acknowledged by the Intelligence Hub. 
5.4. In order to provide a more accurate picture of the potential income the following data
will require to be provided from smaller providers: 
 name of all accommodation providers
 number of beds and rooms in each property
 occupancy rate per month in 2024 
5.5. This is a cumbersome and time-consuming process which involves contacting all
providers. Carrying out this work would require additional resources. Argyll and Bute
Council have appointed external advisors to provide resource and expertise in the
preparations of their programme. It is recommended that a similar approach be
considered to for South Lanarkshire. Subject to approval, funding could be made
available from the UK Shared Prosperity Fund. Again, in common with Argyll and Bute
Council, this could run in parallel to an informal consultation process. An updated
Tourism Strategy would also be required to be prepared which officers would seek
from consultants to develop. 
5.6. All costs incurred by the Council that are associated with the collection and
management of the visitor levy scheme must be covered by the levy income.  
42

Page 43

5.7. Consideration needs to be given to the nature of the projects and initiatives the levy
would support as noted above. The larger city authorities, such as Glasgow and
Edinburgh are proposing to use significant proportions of their income to support the
maintenance of their city centres which are significant tourist attractions in their own
right. Alongside this, there are proposals for promotional and marketing campaigns. 
5.8. The visitor market in South Lanarkshire is very different from that in these cities and
consideration need to be given to what projects and initiatives would best support the
sector, be aligned to the conditions of the levy and benefit the wider communities to
which the visitors come. 
5.9. Promotion and marketing will form part of these proposals, however the nature of
visitor attractions in South Lanarkshire means that the ability to target spending in
specific locations differs greatly from the large cities. 
5.10. It is also common for people to stay in South Lanarkshire accommodation to visit
venues elsewhere in the City Region, e.g. Glasgow attractions or to attend national
sporting events e.g. Ravenscraig, Hampden etc. 
6. Collections Platform
6.1. The Improvement Service is working on developing a single digital platform for local
authorities to manage the levy, but with local flexibility. The platform will be
customisable for all local authority areas, and payments and reminders will be able to
be processed through the system. 
6.2. The platform will allow reports to be run on returns, payments, fines and charges and
there will be a technical support team in place to assist when required, although final
enforcement will fall on local authorities who will also be required to undertake their
own audits on returns. The introduction of the levy would also introduce a new range
of enforcement powers for local authorities. 
6.3. The platform is being funded by early adopters of the visitor levy scheme, and there
will be a fee to onboard which will in part offset some of the set-up cost. An annual fee
will be necessary with costs reducing as more local authorities come on board. The
impact of the platform is not fully known as yet and further dialogue is required with
the Improvement Service, but it’s believed that the Improvement Service will manage
and maintain the platform and provide IT and specific customer service support whilst
directing relevant enquiries to the local authority. Those who are early adopters of the
system will share their learnings in due course. 
7. Use of Funds
7.1. The Act requires a local authority operating a visitor levy scheme to use the net
proceeds of a scheme for certain specified purposes. Those purposes are that the
funds must facilitate the achievement of a scheme’s objectives and that they should
develop, support and sustain facilities and services for or used by visitors to a local
authority area for leisure or business purposes.  
43

Page 44

7.2. Some potential areas for expenditure could be: 
 infrastructure improvements
 street cleaning
 grass cutting
 tourism business support
 cultural and events programme
 destination marketing and management 
7.3. The guidance states that aligning the use of funds with an agreed tourism strategy will
assist local authorities in making funding decisions that will add value to the local visitor
economy, and benefit communities and residents. This approach will allow local
authorities flexibility to shape their spending to align with the delivery of those
strategies which have already been consulted on and agreed by relevant stakeholders. 
8. Next Steps
8.1. The following next steps are proposed: 
 approval to move to informal consultation and appoint consultants to carry out
comprehensive research into the accommodation sector in South Lanarkshire,
assist with obtaining updated income estimates, host informal
consultations/workshops and produce an updated tourism strategy
 findings of the informal consultations and further data gathering along with
approval of an updated tourism strategy will be presented to Executive
Committee in Summer 2026 with the view of seeking approval to move to a formal
consultation stage 
9. Employee Implications
9.1. Due to the specialist nature of this work, it is proposed to appoint external consultants
to lead on the additional data gathering and assist with the informal consultation and
refreshed tourism strategy as set out in Section 8. This is estimated to be in the region
of £20,000 and can be funded from the UK Shared Prosperity Funding for 2025/2026. 
9.2. Should it be agreed that the Council progresses with the implementation of a visitor
levy scheme, consideration will require to be given to how this is resourced across the
Council. Any new posts could be funded directly from the visitor levy revenue. 
10. Financial Implications
10.1. As outlined in paragraph 5.2., a visitor levy could generate between an estimated
£0.8m to £2.5m per annum in South Lanarkshire. This is considered to be a
conservative estimate due to known data gaps. Subject to agreement of the next
steps, a more accurate estimate would be available by Summer 2026. 
10.2. It is considered that a levy would be set to ensure full cost recovery for the
implementation of the scheme. 
11.  Climate Change, Sustainability and Environmental Implications
11.1.  Implementation will be consistent with South Lanarkshire Council’s sustainability
objectives, ensuring funds support environmentally responsible projects.  
44

Page 45

12.  Other Implications
12.1. It is worth noting that with South Lanarkshire’s mix of urban and rural attractions,
including popular tourist destinations, any decision to implement a visitor levy could
have financial and reputational implications for the area, as well as its competitiveness
compared with other authorities within Glasgow City Region. 
13.  Integrated Impact Assessment and Consultation Requirements
13.1. Integrated Impact Assessments will be undertaken as the project is developed. 
13.2. Officers in both Finance and Corporate Resources and Community and Enterprise
Resources have been working collaboratively and have been engaging with other
stakeholders across the Glasgow City Region including VisitScotland, North
Lanarkshire Council and other local authorities, to ensure a well-informed approach to
the visitor levy. 
13.3. Subject to approval, an informal consultation will be undertaken with businesses,
industry partners and local communities to provide input, ensuring the levy is fair,
transparent and aligned with local and national priorities. 
David Booth
Executive Director (Community and Enterprise Resources) 
9 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work to recover, progress and improve
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 Visitor Levy Guidance – October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Laura Sprowl, Economic Development Officer (Tourism) 
Enterprise and Sustainable Development Services
E-mail: laura.sprowl@southlanarkshire.gov.uk
45

Page 46

46

Page 47

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Community and Enterprise
Resources) 
Subject: Glasgow City Region Investment Zone – Proposed
Creation of Non-Domestic Rates Retention Sites 
1. Purpose of Report
1.1. The purpose of this report is to:-  
 advise on the ongoing development of the Glasgow City Region Investment Zone
(GCR IZ) programme, specifically the proposal of Non-Domestic Rates Retention
sites 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the proposal to establish a Non-Domestic Rates Retention site within the
Clyde Gateway area of South Lanarkshire be noted;
(2) that any Non-Domestic Rates growth retained, as a result of the Non-Domestic
Rates Retention sites, be pooled at a Glasgow City Region level and re-invested
back into the Glasgow City Region Investment Zone programme in line with overall
Investment Zone objectives and this re-investment should be determined by
Glasgow City Region Cabinet, as set out in Sections 6 and 7; and
(3) to note that South Lanarkshire Council will continue to be responsible for collecting
Non-Domestic Rates locally. 
3. Background
3.1. GCR IZ is progressing through the Government’s five-stage Gateway Process for
approval of the Investment Zone programme. This process was instigated following
announcement in the summer of 2023 that GCR would receive £160m grant allocation
and be the location of one of two investment zones in Scotland and one of 12 across
the UK.  The other Scottish IZ is located in the north-east Scotland region. 
3.2. Following an extensive analysis and engagement process, led by the GCR Programme
Management Office (GCR PMO), the sectoral focus of the GCR IZ was confirmed by
GCR Cabinet (11 June 2024) as Advanced Manufacturing and Precision Engineering.
Following the recommendation of a dedicated Strategic Investment Plan, a sub-set of
the Regional Economic Partnership, Cabinet agreed (25 February 2025) six short-listed
projects and a tax-site. Table 1 provides an overview of the projects. 
8
47

Page 48

Sector Project Grant Request
Space Skyrora £3.7m 
Project PRISM £33.2m
Semi-Conductors Laser Supply Chain £25.5m 
NCASP £35.3m 
Neuranics £5.1m
Maritime Malin Group £20m*
Tax Site N/A £30m*
Sectoral Support Investment Fund £30.7m 
Business Support /
Skills
£10m
Capacity Funding N/A £6.4m
Total  £200m 
Table 1: Overview of Projects 
4. Non-Domestic Rates Retention Proposed Locations
4.1. As part of the IZ programme, Regional Economic Partnerships (REPs) were able to
propose three sites of 200 hectares each, to a total of 600 hectares that could be
considered as potential sites for Non-Domestic Rates Retention (NDRR) over a 25-
year period.   As per the agreement of the GCR Chief Executives’ Group (14 May
2025), the GCR PMO engaged with the Member Authorities (MAs) to understand the
potential opportunities. 
4.2. The GCR PMO developed a high-level application and evaluation process and asked
MAs to submit proposals by 30 May 2025. 
4.3. Six of the eight MAs submitted proposals to be considered by the PMO. Based on
these submissions, a number of options have been taken forward and further refined
following feedback from the Scottish Government. Advice and guidance on the
options has been provided by KPMG, through their original GCR IZ commission with
Renfrewshire Council.  The proposed locations are considered to present the best
link to the IZ objectives, together with the most viable development timeline. 
4.4. Table 2 provides details of the NDRR locations that are being proposed as part of
the Gateway process. 
Location Member Authority Potential Size
AMIDS / Airport Renfrewshire Council 146 Hectares
Eurocentral North Lanarkshire Council 195.5 Hectares
Glasgow Clyde
Corridor
Glasgow City Council /
South Lanarkshire Council 
209 Hectares
Table 2: List of proposed NDRR locations 
4.5. Scottish Government guidance is clear that, GCR must make a robust argument for
the rationale for any proposed NDRR location. Any location must meet the ‘but-for’
test, where this is defined as; ‘retention of non-domestic rates is a direct consequence
of Investment Zone status’. It is incumbent on GCR to provide a clear narrative for
the locations that are proposed.  
48

Page 49

4.6. The PMO has continued to work with Renfrewshire Council, North Lanarkshire
Council, Glasgow City Council, South Lanarkshire Council and Clyde Gateway Urban
Regeneration Company (URC) to further refine the locations in advance of the final
formal submission of Gateway 4 at the end of September 2025. 
4.7. GCR PMO is confident there is a clear rationale for the three areas that have been
proposed and initial feedback from the Scottish Government supports this. The
NDRR site at the Airport / AMIDS has a clear link to the GCR IZ and the Advanced
Manufacturing sector via the proposed tax-site. Meanwhile there are already a
significant number of Advanced Manufacturing companies located within the
Eurocentral boundary. The proposal that covers Glasgow City Council and South
Lanarkshire Council is centred on existing Advanced Manufacturing activity through
the Innovation Districts at both Glasgow and Strathclyde Universities and clearly links
with the ongoing development at the Clyde Gateway URC. In addition, there were a
number of strong bids for the original GCR IZ ‘open-call’ based in each of the potential
locations for NDRR. 
5. Non-Domestic Rates Retention - Principles and Purpose
5.1. The revenue generated from the NDRR is over and above the GCR IZ £160m grant
allocation and is the devolved responsibility of the Scottish Government. The
retention of rates is on the basis of any uplift in NDR, within the ‘red-line’ boundary,
from an agreed baseline with Scottish Government. 
5.2. As part of the Gateway process, GCR need to demonstrate that any uplift in NDR
would not have been possible without the Investment Zone programme.  In the
absence of the NDRR process, all rates collected by a local authority are transferred
to the Scottish Government, as normal. Establishing NDRR sites as part of the
programme will enable any uplift in NDR, above an agreed baseline, to be retained
and reinvested to support the GCR Investment Zone objectives. 
5.3. Following Scottish Government guidance, any NDR retained should be pooled at the
GCR level and their re-investment supporting the objectives of the IZ Programme,
should be determined by GCR Cabinet. 
5.4. Retained non-domestic rates must be used to promote the Investment Zone’s
objectives and for activity that: would not otherwise occur; demonstrably requires
public funding; and is most appropriately funded from retained non-domestic rates,
rather than other public funding pots. 
5.5. Noted below are the GCR IZ Objectives, agreed by both GCR Cabinet and UK /
Scottish Governments: 
 build on strengths of the Region’s current and emerging cluster specialisms 
 grow new and existing Research and Development focused firms which are
geared to take advantage of local academic expertise
 create a significant number of mid to high skilled ‘good’ jobs
 generate short and longer-term private sector investment in the Region’s cluster
specialisms – both through existing firms and wider supply chain development
 align with existing investment within the Region e.g. City Deal, Innovation
Districts / Innovation Accelerator, UK Shared Prosperity Fund
 maximise the impacts through enhancing connections to existing clusters
 facilitate the development / regeneration of under-developed land and assets
within the Region
 extends the benefit to the whole Region including developing options for a IZ
skills programme for local residents and a regional investment fund 
49

Page 50

5.6. GCR PMO will work with partners to develop a re-investment strategy for any NDR
retained rates to support GCR IZ objectives across the GCR geography. The
Investment Zone Technical Guidance provides clarity on the activity the income from
retained non-domestic rates growth should primarily be used to fund: 
 Investment Zone operating costs
 physical and/or digital infrastructure that will facilitate investment in the
Investment Zone area
 land assembly and/or site remediation works that will facilitate investment in the
Investment Zone area
 skills and workforce development
 innovation initiatives
 mitigating any displacement and/or negative externalities associated with the
Investment Zone
 activity in support of the Investment Zone Net Zero ambitions
 the delivery of Investment Zone -specific planning measures 
6. NDRR Governance
6.1. It is expected that a formal legal agreement will be developed between Glasgow City
Council, on behalf of Glasgow City Region, and the four Member Authorities to agree
the approach for the collection and retention of NDR within the Investment Zone
programme. 
6.2. Reports have been approved by the Chief Executives’ Group (14 May 2025) and City
Region Cabinet (27 May 2025) that make reference to the pooling of the NDR at a
regional level, with their redistribution and use being agreed by Cabinet. 
7. Next Steps
7.1. During September, Renfrewshire Council, Glasgow City Council, North Lanarkshire
Council and South Lanarkshire Council will all seek committee approval for the
collection and retention of Non-Domestic Rates. 
7.2. A final draft of Gateway 3 and 4 will be submitted by GCR PMO to UK and Scottish
Governments by 30 September 2025. Failure to meet this deadline may result in
GCR IZ losing year one grant of £16m.  If local authority approval for the collection
and retention of NDR cannot be secured, before the submission deadline of 30
September 2025, the NDRR site will need to be removed from the GCR IZ
programme. 
8. Employee Implications
8.1. There are no employee implications as a result of the content of this report. 
9. Financial Implications
9.1. As noted above the collection of non-domestic rates is a function the Council carries
out with the rates collected passed to the Scottish Government. This arrangement will
not change with the exception of the rates uplift associated with the Investment Zone
being passed to the City Region in line with the proposed governance arrangements.
These proposals, therefore, have no financial impact on the Council. 
10.  Climate Change, Sustainability and Environmental Implications
10.1.  The aims and objectives of the Investment Zone as set out in paragraph 5.6 of this
report and are fully compatible with the Council’s climate change policy and
procedures.  
50

Page 51

11.  Other Implications
11.1. The risks associated with not supporting the report recommendations is that South
Lanarkshire and the city region will not be able to benefit from the major investment,
job creation and supply chain opportunities. The performance of this sector has a
significant impact on the local economy and quality of life for South Lanarkshire
citizens and the Council’s reputation could also be damaged if it is not seen to actively
support the sector. 
12.  Integrated Impact Assessment and Consultation Requirements
12.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Integrated Impact
Assessment is required. 
12.2.  Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in
employment land and property within South Lanarkshire and with partners across the
City Region.  This consultation and co-operation will continue throughout the duration
of the initiative.  Consultation has also taken place with Clyde Gateway. 
David Booth
Executive Director (Community and Enterprise Resources) 
9 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work to recover, progress and improve
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Ross, Economic Development Manager, 
Enterprise and Sustainable Development Services
E-mail: Iain.ross@southlanarkshire.gov.uk
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Chief Executive  
Subject: Recommendations Referred by the Finance and
Corporate Resources Committee 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the following recommendations referred to this Committee
by the Finance and Corporate Resources Committee of 10 September 2025:- 
 that the Treasury Management Activity Report for 2024/2025 and the
2024/2025 Treasury Management and Prudential Code Indicators be
noted
 that the 2024/2025 Annual Investment Report be endorsed and referred to
the Council for formal approval in line with The Local Government
Investments (Scotland) Regulations 2010
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Treasury Management Activity Report for 2024/2025 and the
2024/2025 Treasury Management and Prudential Code Indicators be noted,
as referred by the Finance and Corporate Resources Committee of 10
September 2025; and 
(2) that the 2024/2025 Annual Investment Report be endorsed and referred to the
Council for formal approval, in line with The Local Government Investments
(Scotland) Regulations 2010, as referred by the Finance and Corporate
Resources Committee of 10 September 2025. 
3. Recommendations Referred by Finance and Corporate Resources Committee
of 10 September 2025 – Prudential Indicators, Treasury Management Activity
and Annual Investment Report 2024/2025 – Extract of Minute
3.1. A report dated 20 August 2025 by the Executive Director (Finance and Corporate
Resources) was submitted on the:- 
 Treasury Management Activity and Prudential Code indicators for 2024/2025
 proposed Annual Investment Report for 2024/2025 
The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of
Practice for Treasury Management required the Council to prepare an annual report
on its Treasury Management activities.  The CIPFA Prudential Code required
councils to prepare a series of financial indicators that demonstrated affordability,
prudence and sustainability with regard to capital financing decisions.
9
53

Page 54

The Council’s Capital Programme included, within its funding package, planned
borrowing.  The Prudential Code provided a framework to assist the management of
the financial implications and helped to demonstrate that borrowing was both
affordable and prudent. 
The Council’s Treasury Management Activity Report for 2024/2025 and the Treasury
Management and Prudential Code Indicators for 2024/2025 were attached as
appendices 1 and 2, respectively, to the report. 
In terms of the Local Government Investments (Scotland) Regulations 2010, the
Council was required to prepare an Annual Investment Strategy prior to the start of
each financial year and an Annual Investment Report after the financial year end. 
Both documents required to be approved by the Council. 
The Annual Investment Strategy for 2024/2025 had covered the following areas:- 
 permitted investments
 risk management
 borrowing in advance 
The Annual Investment Report, attached as Appendix 3 to the report, detailed the
Council’s activity in each of those 3 areas for 2024/2025 and Appendix 4 detailed the
permitted investments that the Council had approved for the financial year
2024/2025. 
No borrowing in advance was taken during 2024/2025. 
The Committee decided: 
(1) that the Treasury Management Activity Report for 2024/2025 and the
2024/2025 Treasury Management and Prudential Code Indicators be noted and
referred to the Executive Committee for noting; and 
(2) that the 2024/2025 Annual Investment Report be endorsed and referred to the
Executive Committee for endorsement prior to submission to the Council for
formal approval in line with The Local Government Investments (Scotland)
Regulations 2010. 
3.2 A link to the report submitted to the Finance and Corporate Resources Committee of
10 September 2025 is provided for information. 
Prudential Indicators, Treasury Management Activity and Annual Investment Report
2024/2025 
4. Employee Implications
4.1. All employee implications were highlighted as part of the original report to the
Resource Committee. 
5. Financial Implications
5.1. All financial implications were highlighted as part of the original report to the
Resource Committee. 
6. Climate Change, Sustainability and Environmental Implications
6.1. All climate change, sustainability and environmental implications were highlighted as
part of the original report to the Resource Committee.
54

Page 55

7. Other Implications
7.1. Any risks or other implications were highlighted as part of the original report to the
Resource Committee. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. There is no requirement to carry out an Integrated Impact Assessment or
consultation in terms of the proposals contained in this report. 
Paul Manning
Chief Executive 
11 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
♦ Finance and Corporate Resources Committee of 10 September 2025 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel: 07385 370089
E-mail:  tracy.slater@southlanarkshire.gov.uk
55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Recruitment Committee – Proposed Amendment to
Membership 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 propose a membership change to the Recruitment Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Councillor Clark replace Councillor Ross as a member of the Recruitment
Committee. 
2. Background
2.1. Following a request from the SNP Group Leader, it is proposed that Councillor Clark
replace Councillor Ross as a member of the Recruitment Committee. 
3. Employee Implications
3.1. None. 
4. Financial Implications
4.1. None. 
5. Climate Change, Sustainability and Environmental Implications
5.1. There are no implications for climate change, sustainability or the environment from
the proposals contained in this report. 
6. Other Implications
6.1. There are no risks associated with the proposals contained in this report. 
7. Integrated Impact Assessment and Consultation Requirements
7.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
8 September 2025
10
57

Page 58

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council – 18 May 2022 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Susan Somerville, Administration Manager
Ext:  4197 (Tel:  01698 454197)
E-mail: susan.somerville@southlanarkshire.gov.uk 
58

Page 59

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 24 September 2025
Report by: Executive Director (Housing and Technical Resources)  
Subject: Annual Review of the South Lanarkshire Anti-Social
Behaviour Strategy 2024 to 2029 
1. Purpose of Report
1.1. The purpose of the report to:- 
 provide the Executive Committee with an update on the progress made
during 2024/2025 against delivering the agreed outcomes set out in the
Anti-social Behaviour Strategy 2024 to 2029
[purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1)  that the progress made against delivering the agreed Anti-social Behaviour
Strategy actions and measures be noted.
[purpose]
3. Background
3.1. The Anti-social Behaviour etc. (Scotland) Act 2004 requires local authorities to prepare,
publish, and review a strategy for dealing with anti-social behaviour within the local
authority area, in conjunction with Police Scotland. 
3.2. The current South Lanarkshire Anti-social Behaviour Strategy was approved by
Executive Committee on 20 March 2024 and implemented from 1 April 2024.   
3.3. The Strategy covers a five-year period with the first annual review outlining progress
achieved during 2024/2025. 
3.4. The Strategy is constructed around six strategic objectives with a series of indicators  
(actions or measures) contained within each to be delivered by the Council and its 
partners. These are: - 
 people behave responsibly in their attitude to alcohol and are educated in
relation to the impact of drugs
 people behave responsibly in relation to fire safety
 the impact of domestic noise is reduced
 illegally discarded litter and household waste is reduced, improving the safety
and attractiveness of communities  
11
59

Page 60

 levels of disorder are reduced, including graffiti and vandalism, improving safety
within communities
 partners engage with residents to promote and improve the availability of and
access to services for those affected by anti-social behaviour 
3.5. The Anti-social Behaviour Strategy Implementation Group (ASBIG) is responsible
for overseeing the ongoing implementation and monitoring of the Strategy. This
partnership group considers progress against outcomes achieved and the effective
reporting of progress through the Safer South Lanarkshire Board and wider
community planning structures. 
3.6. In addition, the ASBIG is responsible for identifying issues to be reflected in the
annual review of the Strategy, including any additions to or removals from the
action plan. 
4. Context and Wider Policy Changes
4.1. A small number of changes in policy context have taken place nationally since the
Strategy was approved in March 2024, including:- 
 the Scottish Government published ‘Reviewing Scotland’s Approach to Anti-
social Behaviour’ to inform future reviews on best practice for preventing and
tackling anti-social behaviour.  This review led to recommendations on ensuring
that approaches to tackling anti-social behaviour are long-term and recognise
societal change
 the establishment of the ‘Independent Working Group on Anti-social Behaviour’
to develop a holistic, long-term, strategic approach to improving the lives of
communities across Scotland.  In February 2025, the group published the report
‘Anti-social Behaviour – Whose Responsibility? Towards a more effective
response to antisocial behaviour in Scotland’.  The report sets out a series of
recommendations and actions which are currently being considered by the
Scottish Government, COSLA and the Scottish Police Authority.  Any actions or
implications stemming from this locally will be considered by partners in the Anti-
social Behaviour Implementation Group
5. Anti-social Behaviour Strategy Annual Review
5.1. The Anti-social Behaviour Strategy 2024 to 2029 is structured around 6 strategic
outcomes.  There are 36 indicators against which the Council monitors
progress, including 22 actions and 14 measures.  In line with wider reporting
arrangements across the Council, these indicators can be categorised into
‘green’, ‘amber’ and ‘red’ depending on the progress made against them. 
Actions can also be recorded as ‘completed’ where appropriate, or ‘to be
reported later’ if they are planned for delivery in a future year of the Strategy. 
5.2.  At the end of 2024/2025, 91% of indicators were in line with projected targets. 
Table 1 outlines the 2024/2025 categorisation of the 36 indicators. 
Table 1: Overview of indicators
Blue Green Amber Red To be
reported later Total
0 33 3 0 0 36
Table 1: Categorisation of ASB Strategy indicators 2024/25 
60

Page 61

5.3. Key highlights across the six strategic outcomes achieved during 2024/2025 are
provided below:- 
Strategic Outcome 1 – People behave responsibly in their attitude to alcohol
and the impact of drug misuse is reduced 
 From June to August 2024, a joint initiative to tackle alcohol associated anti-social
behaviour was undertaken with British Transport Police, Scotrail and Police
Scotland. As a result of this initiative, 47 stop searches were carried out and 13
searches leading to 11 people under the age of 18 having alcohol confiscated
and 3 people arrested. During the three-month operation, there was a 95%
reduction in youth disorder calls at Hamilton Bus/Train Station at the weekends
during the school summer holidays.
 A range of activities were delivered throughout the year to promote positive
behaviours in relation to alcohol consumption and reduce alcohol-related anti-
social behaviour among young people. This included 18 Water and Road Safety
presentations delivered by the Scottish Fire and Rescue Service to highlight the
effect that alcohol can have on risk taking and judgement.
 In response to an increase in the number of instances of public drinking by people
under 18 years of age across Hamilton, Rutherglen, Cambuslang, Carluke and
Lanark, Police Scotland put in place weekend disorder plans, targeted patrols
and daytime and evening surgeries.  Joint visits to the young people were carried
out by Police Scotland and the Anti-social Investigation Team to discuss the
impact of alcohol and under-age drinking.
 Police Scotland reached 1,580 young people through the delivery of drug
education workshops in schools across South Lanarkshire, compared to the
baseline figure of 697 (2022/2023). 
Strategic Outcome 2 – People behave responsibly in relation to fire safety 
 The Scottish Fire and Rescue Service responded to 379 deliberate secondary
refuse fires during 2024/2025, which represents a 25% reduction during the first
year of the Strategy.
 87 fire related education programmes were delivered by the Scottish Fire and
Rescue Service in schools across South Lanarkshire, an increase of 30% during
the first year of the Strategy.
 During the year, Community Safety Hubs discussed the young people identified
as being responsible for secondary fires, referring them to the Joint Problem
Solving Unit Anti-Social Investigation Team for appropriate action.  Interventions
progressed to prevent further fire raising included: referrals to Fire Reach
courses, Fire Safety Support and Education, and the issuing of Behaviour
Contracts.
 Following a series of fires in Bothwell, the Scottish Fire and Rescue Service and
local Community Wardens conducted a door-to-door exercise, speaking to
residents, with a specific focus on young people, about fire safety.  This resulted
in an immediate ceasing of fires in the area.  
61

Page 62

Strategic Outcome 3 – The impact of domestic noise is reduced 
 During 2024/2025 the number of domestic noise complaints reduced by 16% to
2,323, and the number of complaints requiring attendance by an officer to assess
noise levels reduced by 19% to 915.
 Housing and Technical Resources promoted mediation where there are issues
of domestic noise, which can be useful in uncovering unintentional noise where
neighbours have not realised the impact on each other.  During 2024/2025 the
Noise Team made 74 referrals for mediation which has been successful in
reaching agreements and mutually agreeable improvements for residents,
particularly in relation to domestic living noise in four in a block and flatted
properties.
 The Council’s Noise Team are now a partner at Community Safety Hubs to
ensure early intervention where partners highlight a domestic noise issue. As a
result of this partnership working, the Noise Team have now carried out
awareness and promotional training sessions with Housing Officers to enhance
their skills when working with residents responsible for domestic noise. 
Strategic Outcome 4: Illegally discarded litter and household waste is reduced, 
improving the safety and attractiveness of communities 
 In response to issues with bin stores at flatted properties, the Council’s Grounds
Services worked alongside Housing Officers to trial solutions, including
introducing additional bin areas and making bin storage areas more accessible
to encourage bins to be returned after emptying.
 22 Fixed Penalty Notices were issued during the year for the inappropriate
disposal of litter and household waste.
 Fly tipping signage has been installed in hotspot locations to encourage residents
to dispose of their waste responsibly and report fly tipping. To increase
awareness, the Council’s Waste Education officers have also been leafleting
areas where general waste and recycling is not being undertaken. 
Strategic Outcome 5: Levels of disorder are reduced, improving safety within 
communities 
 The number of anti-social behaviour offences recorded by Police Scotland during
2024/2025 decreased by 26% to 2,763.
 During 2024/2025, the number of incidents of Anti-social Behaviour Vandalism
reported to Police Scotland reduced by 27% to 1,225.
 A range of diversionary activities were delivered during the year to tackle disorder
including: 
 The Blueprint Programme delivered by Youth, Family and Community
Learning to engage young people in a range of sports and centre-based
activities
 drug education workshops for S2 and S3 pupils delivered by Universal
Connections and U-Turn
 outreach work within local schools to provide a safe alternative to high-risk
behaviour  
62

Page 63

Strategic Outcome 6: Partners engage with residents to promote and improve
the availability of and access to services for those affected by anti-social
behaviour 
 Victim Support Scotland (VSS) have been liaising with partners to increase
awareness of the service’s support of victims of anti-social behaviour in South
Lanarkshire. This includes continuing to source community locations to enable
victims to have the choice to meet VSS officers face-to-face at a convenient
venue in the community.  During 2024/2025 VSS received 138 referrals from
South Lanarkshire Council for anti-social behaviour compared to the baseline
figure (2022/2023) of 81.
 The Anti-social Behaviour Communications Team delivered an annual
programme of information on the impact that anti-social behaviour has on local
communities and the range of services available to offer support.  Monthly articles
are posted on social media or published in the South Lanarkshire View, including
a video on ‘a day in the life of a community warden’ to highlight the work they do
to tackle anti-social behaviour.  The Council also shared posts on social media
from partners such as Police Scotland and the Scottish Fire and Rescue Service. 
5.4. Three ‘amber’ measures were partially achieved with minor slippage:- 
 Tte number of fly-tipping occurrences within the Council area increased from the
baseline figure of 2,994 to 3,074 during 2024/2025, representing a 2% increase. 
The Council’s Community and Enterprise Resources continues to investigate and
implement preventative interventions to reduce occurrences and change
behaviour
 the number of referrals made to the Council’s Mediation Services for community
mediation decreased from the baseline figure of 418 to 374 during 2024/2025,
an 11% decrease. Despite this slight decrease there has been a year-on-year
increase in positive sustainable outcomes for residents, with the Mediation
Service achieving success rates of 87% in 2022/2023, 97.6% in 2023/2024 and
98% in 2024/2025
 the number of reported crimes of wilful fire-raising rose from the baseline figure
of 153 to 165 during 2024/2025, representing a 7% increase. The increase is due
mostly to the increase in vehicle fires and incidents in relation to fire setting of
bins and rubbish. The Scottish Fire and Rescue Service continues to focus on
reducing instances of deliberate fire setting through partnership working and
delivering anti-social behaviour presentations to young people across South
Lanarkshire 
5.5. There were no red indicators identified during the review and performance
across the outcomes will continue to be monitored by ASBIG in 2025/2026. 
6.  Proposed Revisions to the Strategy
6.1. As well as providing an opportunity to assess and report on progress, the annual
review process allows for a general re-examination of the Anti-social Behaviour
Strategy 2024 to 2029 by partners to ensure that the strategic objectives, actions
and measures remain appropriate, relevant and measurable. 
6.2. Following the completion of the review, no revisions are proposed to the
performance framework at this stage, with all objectives and indicators
remaining relevant. 
63

Page 64

7.  Next Steps
7.1. The annual review will also be presented to the Safer South Lanarkshire Board on
17 November 2025 for noting. 
7.2. The Council will continue to work strategically with Police Scotland and a range of
community safety partners to tackle anti-social behaviour through ASBIG and other
forums across South Lanarkshire throughout 2025/2026. 
7.3. The second annual review will be presented to the Executive Committee in autumn
2026. 
8. Employee Implications
8.1 There are no employee implications as a result of this report. 
9. Financial Implications
9.1 There are no financial implications as a result of this report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no climate change, sustainability, or environmental implications as a
result of this report. 
10.2. The Strategic Environmental Assessment (SEA) pre-screening determination
reached during the development of the strategy concluded that a full SEA was not
required. 
11. Other Implications
11.1. There are no other implications as a result of this report. 
11.2. Undertaking an annual review of the Anti-social Behaviour Strategy is a statutory
requirement.
12. Integrated Impact Assessment and Consultation Requirements
12.1. Whilst the Anti-social Behaviour Strategy 2024 to 2029 was introduced prior to the
implementation of Integrated Impact Assessments, both an Equality Impact
Assessment and a Fairer Scotland Duty assessment were conducted. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
11 September 2025 
Links to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable  
64

Page 65

Previous References
 Executive Committee Report ‘Anti-social Behaviour Strategy 2024 to 2029’, 20 March
2024. 
List of Background Papers
 South Lanarkshire Anti-social Behaviour Strategy 2024 to 2029 
Contact for Further Information
If you would like further information, please contact: -
Lorrainne Meek, Anti-Social Behaviour Manager, Housing and Technical
Resources 
E-mail: lorrainne.meek@southlanarkshire.gov.uk 