Agenda Document Pack - Executive Committee - 27/08/2025

South Lanarkshire Council · 27 August 2025
Back to Executive Committee — 27 August 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 19 August 2025 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 27 August 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson,
Robert Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea
Cowan, Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Gavin Keatt, Susan Kerr,
Ross Lambie, Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Lesley
McDonald, Davie McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John
Ross, David Shearer, Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin
Hose, Cal Johnston-Dempsey, Hugh Macdonald, Kenny McCreary, Elaine McDougall, Mark
McGeever, Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 25 June 2025
submitted for approval as a correct record.  (Copy attached) 
5 - 20 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 4 - 1 April 2025 to 11 July 2025
Report dated 30 July 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
21 - 26 
4 Capital Budget 2025/2026 and Monitoring for Period 4 - 1 April 2025
to 11 July 2025
Report dated 30 July 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
27 - 36 
5 Update to Funding
Report dated 30 July 2025 by Executive Director (Finance and Corporate
Resources).  (Copy attached) 
37 - 40 
Item(s) for Decision 
6 Local Action Fund - Further Spend Proposals
Report dated 30 July 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
41 - 46 
7 Administration and Approval of Firework Control Zones in South
Lanarkshire
Report dated 28 July 2025 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
47 - 52 
8 Consultation on the Scottish Fire and Rescue Service’s Service
Delivery Review
Report dated 7 August 2025 by the Interim Executive Director (Housing
and Technical Resources).  (Copy attached) 
53 - 62 
9 Land and Property Transfers and Disposals
Report dated 30 July 2025 by the Interim Executive Director (Housing and
Technical Resources).  (Copy attached) 
63 - 66 
Item(s) for Noting 
10  South Lanarkshire Local Housing Strategy Annual Review 2024/2025
Report dated 6 August 2025 by the Interim Executive Director (Housing
and Technical Resources).  (Copy attached) 
67 - 76
2

Page 3

11  South Lanarkshire Council Response to Pre-budget Scrutiny Call for
Views on Responding to Long-Term Fiscal Pressures
Report dated 5 August 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
77 - 90 
12  Care Reform (Scotland) Act – Update
Report dated 15 August 2025 by the Director, Health and Social
Care.  (Copy attached) 
91 - 94 
13  Good Food Nation Plan and Call for Evidence
Report dated 30 July 2025 by the Chief Executive.  (Copy attached) 
95 - 102 
14  Council Complaints Report: SPSO Annual Overview 2024/2025
Report dated 6 August 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
103 - 112 
15  Membership Changes
Report dated 13 August 2025 by the Chief Executive.  (Copy attached) 
113 - 114 
Urgent Business 
16  Urgent Business
Any other items of business which the Chair decides are urgent. 
Exclusion of Press and Public 
17  Exclusion of Press and Public
It is recommended that the Committee makes the following resolution:-  
"That, in terms of Section 50A(4) of the Local Government (Scotland) Act
1973, the press and public be excluded from the meeting for the following
item(s) of business on the grounds that it is likely that there will be
disclosure of exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act." 
Item(s) for Decision 
18  Langlands West – Marketing for AI/Data Centre Opportunity
• Exempt information in terms of Paragraph 9 of Part I of Schedule 7A of
the Act
• Exempt information in terms of Paragraph 6 of Part I of Schedule 7A of
the Act 
For further information, please contact:-
Clerk Name: Tracy Slater
3

Page 4

Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 25 June 2025 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Ross Clark, Councillor Gerry Convery (Depute), Councillor Margaret Cooper,
Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Davie McLachlan),
Councillor Maureen Devlin, Councillor Celine Handibode (substitute for Councillor Gavin Keatt),
Councillor Martin Hose (substitute for Councillor Richard Nelson), Councillor Cal Johnston-Dempsey
(substitute for Councillor Maureen Chalmers), Councillor Susan Kerr, Councillor Eileen Logan,
Councillor Katy Loudon, Councillor Ian McAllan, Councillor Catherine McClymont, Councillor Lesley
McDonald, Councillor Elaine McDougall (substitute for Councillor Gladys Ferguson-Miller), Councillor
Mark McGeever (substitute for Councillor Norman Rae), Councillor Mo Razzaq, Councillor Kirsten
Robb, Councillor John Ross, Councillor David Shearer, Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Gladys Ferguson-Miller, Councillor Elise Frame, Councillor
Gavin Keatt, Councillor Ross Lambie, Councillor Davie McLachlan, Councillor Richard Nelson,
Councillor Norman Rae 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; J Kerr, Community Engagement Manager; T Little, Head of
Communications and Strategy
Community and Enterprise Resources
A Brown, Head of Enterprise and Sustainable Development; G Simpson, Partner Liaison Manager
Education Resources
A Donaldson, Interim Executive Director
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; M Milne, Head of Personnel
Services; T Slater, Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
J Fernie, Homelessness and Housing Support Manager; C Jardine, Head of Property Services; G
McParland, Property Manager (Assets and Estates); C Mitchell, Interim Head of Housing Services
Health and Social Care/Social Work Resources
L Purdie, Head of Children and Justice Services 
Chair’s Remarks
The Chair advised that he had received a request, in terms of Standing Order No 4(c), to consider an
item of urgent business in relation to school transport.  The Chair ruled that he would not be accepting
this request as he did not consider the matter to be urgent.  The Chair further advised that, following
a request by the Chair of the Education Resources Committee, a briefing on the issue would be
circulated to all members this week. 
In response to a Point of Order made by Councillor Loudon, at the invite of the Chair, the Head of
Administration and Legal Services advised that he was content with the Chair’s approach being in
accordance with the Council’s Standing Orders on Procedures.  
2
5

Page 6

1 Declaration of Interests 
No interests were declared. 
Councillors Johnston-Dempsey and Devlin made a transparency statement in relation to item 9 of
the agenda, Local Action Fund – Spend Proposals, as they volunteered with Bothwell Futures. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 28 May 2025 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Year-End 2024/2025 
A report dated 3 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the Council’s General Fund Revenue Account and
Housing Revenue Account for the period 1 April 2024 to 31 March 2025. 
Information was provided on:- 
 the year-end outturn position across Resources, Corporate Items, Loan Charges and
Council Tax, which was an underspend of £0.548 million after proposed transfers to reserves
 the proposed adjustment to the transfers to reserves of £45.580 million, approved as part of
the probable outturn, to include £1.828 million to reflect the year-end position
 proposed year-end transfers to reserves of £9.023 million
 the retention of underspends for use by South Lanarkshire Leisure and Culture and the
Integration Joint Board, as outlined in the report
 the proposed transfer of unused Empty Property Relief money to the Insurance Fund
 the proposed use of the £0.548 million underspend to support the Winter Wishes Strategy
in 2025/2026 (£0.040 million) and the pay award (£0.508 million), leaving a breakeven
position
 the Housing Revenue Account (HRA) breakeven position after a transfer from reserves 
Officers responded to members’ questions in relation to various aspects of the report. The
Executive Director (Finance and Corporate Resources) undertook to provide members with:- 
 information on the costs related to storms once there was a final position
 a copy of the Reserves report that would be going to the Finance and Corporate Resources
Committee following the summer recess 
The Committee decided: 
(1) that it be noted that across Resources, Corporate Items, Loan Charges and Council Tax,
there was a year-end underspend of £0.548 million, after proposed transfers to reserves, as
detailed in Section 4 and Appendix 1 of the report; 
(2) that the Probable Outturn transfers approved by Committee be revised to £47.409 million
(previously £45.580 million), as detailed in Appendix 3 of the report; 
(3) that the additional year-end transfers to reserves totalling £9.023 million, as detailed in
Appendix 4 of the report, be approved;  
6

Page 7

(4) that the underspend of £0.700 million in relation to South Lanarkshire Leisure and Culture
(SLLC) utilities costs be returned to SLLC for use in future years, as detailed in Section 4.5
of the report; 
(5) that the additional non-recurring underspend of £0.170 million in the delegated budget to the
Integration Joint Board (IJB) be held in reserves for use in future years, as detailed in
sections 4.6 and 4.7 of the report; 
(6) that the monies previously set aside for Empty Property Relief which was no longer required
(£0.700 million) be transferred to support the cost of Insurance, as detailed in section 4.16
of the report; 
(7) that the £0.548 million underspend, after proposed transfers to reserves, be allocated to
Winter Wishes (£0.040 million) and to support the Pay Award (£0.508 million), as detailed in
section 4.20 of the report; 
(8) that the resulting breakeven position for the Council for 2024/2025, as detailed in section
4.23 of the report, be noted; and 
(9) that the breakeven position on the Housing Revenue Account, as detailed in Section 5 of
the report, be noted. 
[Reference: Minutes of 30 April 2025 (Paragraph 3)] 
4 Revenue Budget Monitoring for Period 2 - 1 April to 16 May 2025 
A report dated 3 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the General Fund Revenue Account and the Housing
Revenue Account for the period 1 April to 16 May 2025 and a forecast for the year to 31 March
2026. 
The report and associated appendices provided information on the:- 
 projected outturn for 2025/2026 for the Council’s General Fund Revenue Account
 General Fund Account for the period to 16 May 2025
 following key budget areas, including proposed transfers to reserves:-
 2025/2026 investments
 loans fund review
 employer National Insurance contributions
 Children and Family Services
 teacher numbers
 additional support for learning
 pay award assumptions
 Housing Revenue Account position 
Following a member’s question, the Executive Director (Finance and Corporate Resources) gave
an undertaking to provide the member concerned with information on the estimated cost of the
increase in employer National Insurance contributions for South Lanarkshire Leisure and Culture
(SLLC), which had been built into SLLC’s budget. 
The Committee decided: 
(1) that the projected breakeven position on the General Fund Revenue Account for 2025/2026,
as outlined in section 4.1 of the report, and the actual spend as at 16 May 2025, as detailed
in Appendix 1 of the report, be noted;  
7

Page 8

(2) that the proposed transfers to reserves, as outlined in sections 4.3 and 4.4 of the report, be
approved; and 
(3) that the projected breakeven position on the Housing Revenue Account for 2025/2026, and
the actual spend as at 16 May 2025, as detailed in section 5 and Appendix 2 of the report,
be noted. 
[Reference: Minutes of South Lanarkshire Council of 26 February 2025 (Paragraph 2)] 
5 Capital Budget Monitoring Final Outturn – 2024/2025 
A report dated 4 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 the outturn position of the General Services and Housing Capital Programmes for the year
ended 31 March 2025
 the projects, expressed in financial terms, which had been carried forward into 2025/2026 
Total spend on the General Services Capital Programme 2024/2025, as detailed in Appendix 1 to
the report, amounted to £54.652 million.  This compared to the budget of £69.832 million and
resulted in an underspend of £15.180 million.  This would be carried forward to the 2025/2026
financial year.  Details were provided in Appendix 3 on the reasons for the underspend and those
projects that would continue into 2025/2026.  Information was also provided on the year-end
accounting adjustments. 
The Housing Capital Programme 2024/2025, as detailed in Appendix 4 to the report, totalled
£77.248 million, with actual expenditure amounting to £71.544 million, an underspend of £5.704
million.  Details were given on the reasons for the underspend, which would be carried forward to
the Capital Programme 2025/2026. 
The Executive Director (Finance and Corporate Resources) responded to members’ questions on
various aspects of the report. 
The Committee decided: 
(1) that the outturn on the 2024/2025 General Services Programme of £54.652 million, as
detailed in section 5.1 of the report, be noted; 
(2) that the underspend of £15.180 million of General Services Capital Programme be carried
forward into 2025/2026, as detailed in section 6.3 of the report; 
(3) that the outturn on the 2024/2025 Housing Capital Programme of £71.544 million, as
detailed in section 7.2 of the report, be noted; 
(4) that £5.704 million of Housing Capital Programme be carried forward into 2025/2026, as
detailed in section 7.3 of the report; and 
(5) to note that the level of overall spend anticipated in 2025/2026, for both the General Services
and Housing Capital Programmes, was the subject of a separate report to this Committee,
as detailed in sections 6.4 and 7.3 of the report. 
[Reference: Minutes of 30 April 2025 (Paragraph 4) and Minutes of South Lanarkshire Council of
26 February 2025 (Paragraph 3)]  
8

Page 9

6 Capital Budget 2025/2026 and Monitoring for Period 2 - 1 April to 16 May 2025 
A report dated 4 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 consolidation of capital budget monitoring to give a Council-wide summary of the 2025/2026
Capital Programme, including 2024/2025 carry forward
 progress on the Capital Programme for the period 1 April to 16 May 2025 
At its meeting on 26 February 2025, the Council agreed a General Services base budget for
2025/2026 amounting to £60.216 million.  Since the approval of this programme, the financial year
end and additional funding received had resulted in a revised General Services base budget
position for 2025/2026 of £64.188 million.  Details relating to this were provided in appendices 2
and 3 to the report. 
Since the budget was approved in February 2025, Resources had submitted proposed
adjustments totalling £3.909 million.  A detailed breakdown of those proposals was provided in
Appendix 1 to the report and, if approved, the total capital spending programme for 2025/2026
would be £68.097 million. 
Appendix 3 summarised the programme spend and funding for the General Fund.  Budget for the
period amounted to £2.807 million and, as at 16 May 2025, £0.560 million had been spent. 
The Housing Capital Programme for 2025/2026 amounted to £85.948 million.  Following carry-
forward and other adjustments, a revised Housing Capital Programme of £87.540 million was
proposed.  Budget for the period amounted to £2.462 million and, as at 16 May 2025, £2.462
million had been spent. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
Following a request from Councillor Robb, officers from Roads and Transportation Services would
provide information on the Active Travel funding projects. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in section 4 of the
report, and the Housing Capital Programme, as detailed in section 5 of the report, be
approved; 
(2) that the adjustments to the General Fund programme, listed at Appendix 1 of the report, be
approved; and 
(3) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of South Lanarkshire Council of 26 February 2025 (Paragraph 3)] 
7 Employee Workforce Monitoring Information - 1 April 2024 to 31 March 2025 Yearly
Summary 
A report dated 21 May 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on workforce monitoring information relating to the Council for the period 1 April 2024
to 31 March 2025, as follows:- 
 attendance statistics
 occupational health statistics  
9

Page 10

 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 employee development
 labour turnover/analysis of leavers and exit interviews
 recruitment monitoring
 Staffing Watch as at 8 March 2025 
The Committee decided: that the report be noted. 
[Reference: Minutes of 26 June 2024 (Paragraph 8)] 
8 2026/2027 to 2027/2028 Revenue Budget Strategy 
A report dated 6 May 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the Budget Strategy for 2026/2027 to 2027/2028. 
Information was provided on:- 
 the anticipated budget gap for years 2026/2027 to 2027/2028, including information on the
Government Grant and the impact of budget decisions taken during the 2025/2026 budget
setting process
 the programme of Transformational Reviews ongoing across the Council
 how an increase in Council Tax could impact the budget gap
 the proposed timeline for the next steps of the budget 
 the annual review of the Reserves Strategy
 financial management and resilience
 communication and engagement with elected members and the public
 the risks for the budget 
In response to questions from Councillor Loudon, the Chair confirmed that:- 
 an update on the number 65 bus service would be included in the briefing paper on school
transport to be circulated to members this week
 the briefing paper would not be marked confidential and could assist councillors in dealing
with enquiries from constituents 
The Chief Executive also confirmed that a final figure on the estimated savings in relation to school
transport would be included in the briefing. 
The Committee decided: 
(1) that the Revenue Budget position for 2026/2027 to 2027/2028, as detailed in section 4 and
Table 1 of the report outlining the Budget Gap of £24.273 million, be noted; 
(2) that the potential increase of the budget gap to £42 million, due to the pay award, as detailed
in section 4.10 to 4.15 of the report, be noted; 
(3) that the programme of Transformational Reviews, as detailed in Section 5 of the report, be
noted; 
(4) to note that, in arriving at the Budget Gap, no account had been taken of any increase in
Council Tax, as detailed in section 6.1 of the report;  
10

Page 11

(5) to note that a strategy around increasing Council Tax could contribute to reducing the Budget
Gap, as detailed in section 6 of the report; 
(6) that the summary and next steps, including a timeline, as outlined at section 7 of the report,
be approved; and 
(7) that the risks, as detailed at section 15.3 of the report, be noted. 
[Reference: Minutes of South Lanarkshire Council of 26 February 2025 (Paragraph 2)] 
9 Local Action Fund – Spend Proposals 
A report dated 17 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the proposed spend of the Local Action Fund which had an allocation of £50,000 for
each of the Council’s 20 geographical wards. 
The allocation of £50,000 to each of the Council’s 20 geographical wards had been approved by
the Council at its meeting on 26 February 2025.  Members had been issued with guidance to
assist in the process of considering how the monies could be spent and were encouraged to
discuss possible suggestions with their fellow ward councillors. 
Proposals for 13 wards that had reached agreement were attached as Appendix 1 to the report. 
In response to a member’s question, the Chair outlined the procedure that would be followed
should ward members fail to come to an agreement. 
The Committee decided: 
(1) that the proposals for the 13 agreed Council ward submissions, as detailed in Appendix 1 to
the report, be approved; and 
(2) that it be noted that the proposals for the remaining 7 wards would be submitted to a future
meeting of the Committee. 
[Reference: Minutes of South Lanarkshire Council of 26 February 2025 (Paragraph 2)] 
10 Agile Working Guidance 
A report dated 4 June 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on proposals to implement agile working guidance for all Council employees and
managers and to standardise agile working arrangements across the Council. 
The Council had gone through a period of change over the last decade as the interaction options
for customers and service users had broadened, as well as advances in technology and new ways
of working.  This had resulted in a range of flexible and agile working arrangements being agreed,
including the ability to work from home.  However, as there was no policy or guidance for
employees and managers to refer to, this had resulted in inconsistencies in the operational
application of those arrangements. 
Since October 2024, work had been underway to gather data relating to the current workstyles
and arrangements within the Council, with an analysis of those who worked in an agile way
provided in paragraph 3.7 of the report.  
11

Page 12

The Agile Working Guidance proposed the introduction of the following 4 workstyles across all
posts within the Council:- 
 Fixed Frontline
 Fixed Office
 Fixed Office Grade 5 and above
 Agile Office 
Details on each of the workstyles were provided in Section 5 of the report. 
Employees would be provided with 3 months’ notice, from July to September 2025, of the
workstyle proposals being introduced prior to their proposed implementation in October 2025. 
This would provide employees and services with a reasonable period to make any necessary
arrangements that might be required and allow Resources to finalise their arrangements for the
workspace.  It would also allow the Council to deal with any Agile Working Change Requests and
related activity, where required.  Individual change requests would be considered in accordance
with the guidelines detailed in Section 7 of the report. 
It was proposed to conduct a review exercise 18 months following the introduction of the Agile
Working Guidance to give the Council the opportunity to review the arrangements and make any
necessary adjustments. 
A copy of the Agile Working Guidance was attached as Appendix 1 to the report. 
The Head of Personnel Services responded to members’ questions in relation to various aspects
of the report and gave an undertaking to expand on the answer to the Frequently Asked Question
on those employees who might be able to work from home but not from the office due to an injury. 
The Chief Executive advised that the guidance set a baseline for the Council’s position and
confirmed that there would be flexibility and reasonableness in the Council’s approach when
engaging with its employees. 
In response to Councillor Robb’s request for an update on the commitment to consider a 4-day
working week, the Chair advised that the 4-day working week was being pursued via COSLA and
agreed that an update could be provided at a later date. 
After extensive discussion, Councillor Fagan, seconded by Councillor Convery, moved the
recommendations in the report, with an additional recommendation that a further report on the
implementation be brought to committee following the 18-month review period. 
Councillor Clark, seconded by Councillor Johnston-Dempsey, moved as an amendment that the
report be deferred to allow further discussions with trades unions, with a view to seeking
agreement and bringing back a more detailed report for decision. 
On a vote being taken using the electronic voting system, 16 members voted for the motion and
10 for the amendment.  The motion was declared carried. 
The Committee decided: 
(1) that the Agile Working Guidance, attached as Appendix 1 to the report, and proposals for
standardising agile working arrangements across the Council, be approved; 
(2) that the implementation timescales detailed in section 7 of the report be approved; and  
12

Page 13

(3) that a further report on the implementation of the Agile Working Guidance be brought to
Committee following the 18-month review period. 
Councillor McClymont, having experienced technical difficulties, texted her voting preference to the
Clerk 
In terms of Standing Order No 14, the Chair adjourned the meeting following this item of business at
12.10pm and reconvened at 12.23pm.  Due to technical difficulties experienced, Councillor Brogan
attended the remainder of the meeting as a substitute for Councillor McClymont 
11 Homelessness Temporary Accommodation Proposal 
A report dated 21 May 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted on a proposal to meet increased temporary accommodation needs, reduce
unplanned budget overspend and ensure legislative compliance. 
The Council’s Temporary Accommodation Strategic Plan set out the approach to the provision of
temporary accommodation, which was largely self-contained furnished properties.  This was
supplemented by rapid access First Stop accommodation, meeting immediate housing need, and
relatively small-scale provision of supported accommodation to meet multiple and complex
support needs ahead of community settlement. 
Over the last 4 years, the Plan had detailed a requirement for additional temporary
accommodation provision.  In response, Housing Services had increased the supply of temporary
furnished accommodation properties across communities year on year.  The challenges in
securing temporary accommodation provision were outlined in Section 3 of the report.  In
particular, the trend in increased spend on bed and breakfast accommodation over the last 4 years
was highlighted. 
A Council owned site, at Beckford Street Business Centre, had been identified as an option for
the development of First Stop accommodation.  The property had been vacant for several years
and, as a result, its condition had deteriorated, although the structure of the building was intact. 
No alternative purpose for its use had been identified and it was currently incurring holding costs
to the Council linked to its security, non-domestic rates and potential demolition. 
Feasibility studies had indicated its suitability for use as temporary accommodation, with the
estimated costs of repairs and set-up estimated to be £1.020 million.  Estimated running costs for
its operation of First Stop would be £0.650 million per annum.  Rental income would, however,
significantly offset running costs, with remaining running costs fully covered within the existing
Homeless Business Plan.  It was highlighted that the running costs from the Council’s former First
Stop project, delivered from Lindsay House, were held as a saving for an interim period between
the closure of Lindsay House and the set up of a replacement project. 
It was proposed that the Council appoint a management agent, via standard procurement
processes, who would be responsible for the delivery of rented accommodation and associated
services, including lease of the building from the Council. 
Property Services’ initial assessment concluded that the property could be in use as temporary
accommodation within 6 months of project approval to delivery, therefore, potentially available for
use in early 2026.  
13

Page 14

At its meeting held on 12 February 2025, this Committee approved a transfer to Reserves of
£0.237 million for investment in the Homelessness Service to meet future demands.  The year-
end position for Housing and Technical Resources included a proposal to increase the transfer to
reserves in 2024/2025 to £0.437 million.  Across 2025/2026 and 2026/2027, the underspends
anticipated totalled approximately £0.730 million and would contribute to the overall costs of the
project, and result in a total funding package of £1.171 million to cover the initial set-up costs. 
The net cost of running the service was estimated to be £0.300 million which was already
accounted for in the homelessness business plan. 
The Homelessness and Housing Support Manager responded to members’ questions on various
aspects of the report. 
In response to Councillor Allison’s question in terms of a previous planning application for this
area, the Head of Enterprise and Sustainable Development gave an undertaking to provide an
update to him. 
The Committee decided: 
(1) that the proposal to increase the supply of First Stop accommodation, mitigating reliance on
bed and breakfast, be approved; 
(2) that the proposal to develop the Council owned site at Beckford Business Centre for this
purpose be approved; and 
(3) that the proposal to fund capital costs utilising underspend in the Homeless Budget across
the years 2024/2025 to 2026/2027 be approved. 
[Reference:  Minutes of 12 February 2025 (Paragraph 3)] 
12 Land and Property Transfers and Disposals Report 
A report dated 27 May 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted on proposed actions in respect of land and property transactions. 
The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
The Property Manager (Assets and Estates) responded to members’ questions on various aspects
of the report. 
The Committee decided: 
(1) that the land detailed in Appendix A be declared surplus to Council requirements and
transferred to the Corporate Land Bank for disposal; and 
(2) that the land detailed in Appendix B, which would be the subject of negotiated transactions,
be declared surplus to Council requirements. 
Councillor Allison left the meeting during consideration of the above item of business  
14

Page 15

13 Health and Care (Staffing) (Scotland) Act 2019 
A joint report dated 16 May 2025 by the Director, Health and Social Care, Executive Director
(Finance and Corporate Resources) and Interim Executive Directors (Education Resources) and
(Housing and Technical Resources) was submitted providing:- 
 an update on the requirements of the Council in relation to the annual return required in
terms of the Health and Care (Staffing) (Scotland) Act 2019
 the annual return in relation to reporting requirements 
The Health and Care (Staffing) (Scotland) Act 2019, which came into effect on 1 April 2024,
required every local authority and Integration Authority to have regard to a number of listed factors
when planning or securing the provision of a care service from a third party, as detailed in Section
3 of the report. 
There was now a requirement under the terms of the Act for every local authority to publish an
annual report to demonstrate how the regulations had been complied with.  The proposed South
Lanarkshire response for 2024/2025 was attached as Appendix 1 to the report. 
It was highlighted that Health Board requirements had a separate reporting structure and the
requirements under the Integration Authority were only for those services commissioned through
a Council route. 
The Committee decided: 
(1) that it be noted that the Council had complied with the requirements of the Health and Care
(Staffing) (Scotland) Act 2019 for its year one return; and 
(2) that the return, attached as Appendix 1 to the report, be approved as the Council response
to be returned by 30 June 2025. 
Councillor McGeever left the meeting during consideration of the above item of business 
14 Commissioning Plan for Services Delivered by South Lanarkshire and Leisure and
Culture (SLLC) 
A report dated 4 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the proposed Commissioning Plan for services delivered by South Lanarkshire
Leisure and Culture (SLLC) Scottish Charitable Incorporated Organisation (SCIO) (2025 to 2027). 
A draft of the Commissioning Plan had been presented to this Committee in March 2025 for noting
prior to consideration by the SLLC Board at its meeting in April 2025.  It had since undergone
some minor amendments, as detailed in paragraphs 4.8 to 4.12 of the report, and a draft copy
was attached as Appendix 1 to the report. 
The Committee decided: 
(1) that the Commissioning Plan for South Lanarkshire Leisure and Culture SCIO (2025 to
2027), attached as Appendix 1 to the report, be approved; 
(2) that officers now undertake an exercise to review, update and streamline the legal
documentation that underpinned the Council and SLLC relationship; and 
(3) that officers develop a detailed performance framework for the approved Plan and present
this to a subsequent Executive Committee for approval. 
[Reference:  Minutes of 12 March 2025 (Paragraph 11)] 
15

Page 16

15 Marmot Place Programme for South Lanarkshire 
A report dated 5 June 2025 by the Chief Executive was submitted on progress made on the
Marmot place programme and seeking approval of the proposed prioritisation of the programme,
as well as the next steps. 
The Marmot place programme had the following 3 practical phases:- 
 Phase 1:  Data and evidence analysis
 Phase 2:  System analysis (Health Equity System)
 Phase 3:  Recommendations and action plan 
The programme was currently in Phase 1 and commencing Phase 2. 
A South Lanarkshire Marmot Data Working Group had been established to collate and analyse
even more localised data sets to complement the work and reports of the Institute of Health Equity
(IHE).  The Working Group would create and narrate 8 local data sets based on the Marmot
Principles.  Those would be available and accessible for all to use and were on track to be
completed in summer 2025. 
In the autumn, workshops to co-develop and verify the evidence base would be hosted and open
to a wide range of local stakeholders. 
The South Lanarkshire Leadership Group, established as part of the governance arrangements,
was composed of key community planning partners, including the third sector.  The Leadership
Group considered how the programme would be able to maximise what the Council and partners
would learn from a time and resource-limited project.  The Leadership Group had come to a
consensus that, given that both the Council and the Community Planning Partnership had a
priority to tackle poverty, then a child poverty lens should be applied to the Marmot practice
through which many of the 8 principles and work with both children and families across a range
of ages and stages would be incorporated. 
Furthermore, a focus within this on early years acknowledged the largest potential long-term
impact for effective early intervention and prevention by reducing health inequity and improving
life prospects for this population group. 
Further analysis was underway to break data down to neighbourhood levels and compare health
outcomes of the local population. 
The programme was now in the early stages of Phase 2 and the Leadership Group wanted to
specifically apply the evidence to child poverty.  The programme would identify where prevention
approaches would bring an improvement in outcomes for the residents of South Lanarkshire while
supporting a public sector reform space for the public service systems that served them. 
Throughout Phase 2, the IHE would support the partnership by hosting a partnership workshop to
analyse the local health equity system and develop actions to improve its outcomes.  As Phase 2
progressed, the localised data would help identify where there were greater areas of need and
compare the allocation of the Partnership’s joint support and resources across the family support
systems in South Lanarkshire.  This information would be critical to plan service delivery and
invest in prevention in a considered and evidence-based manner. 
Details of the next steps and key upcoming development were outlined in Section 8 of the report. 
The Community Engagement Manager responded to members’ questions on various aspects of
the report.  
16

Page 17

In response to a member’s comment in terms of keeping members briefed on progress outwith
the committee process, the Chair suggested that it might be helpful, as a first step, to circulate the
initial report on the Marmot Place Programme to all members.  Officers could then consider ways
that Marmot information could be included in councillor briefings. 
The Committee decided: 
(1) that the proposed prioritisation of the programme on child poverty and family support in the
early years be approved; and 
(2) that the Council’s role in the planned next steps, delivered through the Community Planning
Partnership, be approved. 
[Reference:  Minutes of 11 December 2024 (Paragraph 10)] 
Councillors McDougall and Ross left the meeting during consideration of the above item of business 
16 Equalities Mainstreaming Progress Report 
A report dated 21 May 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on progress achieved in meeting the Council’s equality outcomes in 2025 and in
mainstreaming equalities within the Council. 
The Mainstreaming Equalities Report 2025, attached as Appendix 1 to the report, set out the
Council’s equality outcomes for 2025 to 2029 and reported on the progress of the equality
outcomes from 2023 to 2025.  The Report was also available on the Council’s website. 
The equalities outcomes were included in the Council Plan, “Connect” to ensure equalities duties
were mainstreamed into the culture of the Council.   
In line with the Scotland specific duties of the Equality Act 2010, the Mainstreaming Equalities
Report 2025 contained the Council’s workforce figures and position on the gender pay gap. 
In line with the guidance provided by the Equality and Human Rights Commission, the Council’s
outcomes for 2025 to 2029 would focus on actions to produce results intended to achieve specific
and identifiable improvements in people’s life chances. 
The Committee decided: that the Equalities Mainstreaming Report 2025 be noted. 
[Reference:  Minutes of 21 June 2023 (Paragraph 11)] 
17 Interim Update 10-Year Estate Strategy 
A report dated 4 June 2025 by the Interim Executive Director (Housing and Technical Resources)
was submitted providing:- 
 an update on the development and implementation of a cross-cutting review of the Council’s
property asset base, which was linked to an intention to seek approval for a 10-year Estate
Strategy
 a summary of tasks undertaken to date and confirming the timescales for the subsequent
phase of this exercise 
Since March 2025, work had continued to progress on a review that would promote a strategic
and outcome focused methodology to asset management, with the key aim of securing approval
for a 10-year Estate Strategy. 
17

Page 18

The approach to strategy development had been split into 3 inter-related phases. 
Phase One was ongoing and scheduled for completion by the end of June 2025.  It comprised a
comprehensive review of assets and properties within the Council’s public building estate using
an assessment and scoring criteria, as outlined in paragraph 4.2 of the report. 
Phase Two would explore and identify potential service transformation initiatives, making the case
for investment.  Using the information generated from Phase One, it would identify potential
funding sources and create a potential list of prioritised real estate/project pipeline against each
potential funding source, based on availability and achievability. 
Phase Three was the development of the Estate Strategy and an associated 10-year delivery
plan.  This would provide detailed objectives, timelines and financial projections and include future
governance arrangements. 
An initial high-level public consultation exercise had been conducted following consideration of
the Estates Strategy Review previously at this Committee which ran until 30 May 2025.  The
results of the initial survey showed general approval for the approach, details of which were
outlined in paragraph 6.3 of the report. 
Section 7 of the report outlined the steps to be taken to progress to the conclusion of the exercise. 
In response to a member’s question, the Chair advised that Housing and Technical Resources
would circulate a response to all members of the Committee in relation to ways in which they could
encourage an increase in participation in terms of the next stage of the consultation. 
The Committee decided: 
(1) that the progress made to date and next steps on the development and implementation of a
cross-cutting review of the Council’s property asset base be noted; 
(2) that the initial phase of public consultation feedback be noted; and 
(3) to note that a final report on the proposed 10-Year Estate Strategy would be presented to
this Committee on 5 November 2025. 
[Reference:  Minutes of 12 March 2025 (Paragraph 10)] 
18 Commercial Opportunities Update 
A report dated 4 June 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the work being undertaken to explore commercial
opportunities for the Council. 
An update was provided on investment opportunities in relation to the following:- 
 Town Centre Regeneration
 Civic Centre, East Kilbride
 East Kilbride Shopping Centre
 Hamilton Town Centre
 inward investment
 film and TV opportunities
 renewable energy  
18

Page 19

The Committee decided: that the work being undertaken to explore commercial
opportunities be noted, specifically in relation to Town
Centre activity, Langlands West and film and TV
opportunities. 
19 Resource Plans and Connect Reporting 2025/2026 
A report dated 27 May 2025 by the Chief Executive was submitted on the 2025/2026 Resource
Plans. 
The Resource Plans for 2025/2026 had been prepared in line with corporate Resource Planning
guidance and a Resource Plan template. 
In preparing the 2025/2026 Plans, Resources had undertaken a horizon scanning and situational
awareness exercise covering:- 
 social change, legislation and policies
 areas for improvement, including the Local Government Benchmarking Framework (LGBF)
 customer views and external inspection results 
 other triggers for action such as top risks 
From that exercise, a number of areas had been selected for inclusion and development in each
Resource Plan and those were detailed in the report.  The Resource Plans 2025/2026 were
provided as a link contained in the report. 
Resources had used the 6 Connect outcomes to generate their own Resource outcomes,
supported by a range of actions and measures.  Additional actions and measures had also been
developed under the heading Delivering the Plan and Achieving Best Value.  Details were given
on the number of measures from each Resource Plan and achieving Best Value. 
Progress reports would be submitted to the Performance and Review Scrutiny Forum and
appropriate Resource Committee for monitoring at Quarters 2 and 4. 
The Committee decided: 
(1) that the Resource Plans 2025/2026, prepared in line with the corporate guidance, be noted;
and 
(2) that the reporting intention in relation to Connect, summarised at Section 5 of this report, be
noted. 
[Reference: Minutes of 26 June 2024 (Paragraph 16)] 
20 Urgent Business 
There were no items of urgent business. 
19

Page 20

20

Page 21

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 4 - 1 April 2025
to 11 July 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of the forecast for the year to 31 March 2026 for the
Council’s General Fund Revenue Account and Housing Revenue Account, and
the actual spend position for the period 1 April 2025 to 11 July 2025
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the projected break-even position on the General Fund Revenue Account
for 2025/2026 (section 4.1), and the actual spend as at 11 July 2025
(Appendix 1), be noted;
(2) that the available budget of £4.2 million in 2025/2026 (section 4.5) be
transferred to Reserves, and consideration given to its use to support the
Budget Strategy, be approved;
(3) to note that the proposals for the use of £1.8 million Additional Support for
Learning (ASL) funding will be presented to the September meeting of the
Executive Committee, (section 4.7);
(4) that the anticipated underspend of £7.106 million in core Council budget
(section 4.9) be transferred to Reserves, and consideration given to its use to
support the Budget Strategy, be approved; and
(5) that the projected break-even position on the Housing Revenue Account for
2025/2026, and the actual spend as at 11 July 2025 (section 5 and Appendix
2), be noted. 
3. Background
3.1. This overview report will summarise the projected outturn for 2025/2026 for both the
Council’s General Fund (section 4) and for the Housing Revenue Account (section
5).  It will also provide the actual spend as at 11 July 2025. 
4. General Services 2025/2026 Projected Outturn as at 13 June 2025
4.1. As at 11 July 2025, the projected outturn position for 2025/2026 on the General
Services budget is break-even (Appendix 1).  The actual spend to date is shown in
Appendix 1. 
4.2. Section 4.3 onwards provides detail on a number of key budget areas.  
3
21

Page 22

4.3. Pay Award: National agreement has now been reached on the pay award for
Scottish Joint Council (SJC), Craft Operatives and Chief Officials on the basis of a
4% uplift in 2025/2026 and 3.5% in 2026/2027.  The 2025/2026 uplift will be paid in
August 2025 and the budget allocated to Resources in period 5 based on
requirements.  Funding from the Scottish Government to support the enhanced pay
offer in 2025/2026 is also due to be received.  There will be no gap in funding in
2025/2026 once the Scottish Government’s 1% has been received, however, this
multi-year pay award is higher than budgeted by the Council and has increased the
Budget Gap in future years.  Funding for this is being considered as part of the
ongoing work on the 2026/2027 and 2027/2028 Revenue Budget Strategy. 
4.4. Discussions on the pay offer for Teachers are ongoing and being considered by the
Scottish Negotiating Committee for Teachers (SNCT) Teachers Panel.  Updates will
be provided as further information becomes available. 
4.5. Teacher Numbers / Reduced Class Contract Time:  A budget issue was identified
in relation to teacher numbers during the Council’s 2025/2026 Budget process.  £4.2
million was earmarked as this was the estimated cost if we had to reinstate teacher
numbers to the 2023 level.  As there is no longer a need to restore teacher numbers
to the higher level, this budget line can be transferred to reserves.  Given the budget
pressures resulting from the higher than budgeted pay award, it is recommended
that consideration be given to using the £4.2 million to support the Budget Strategy –
with a view to setting this aside for Pay Award. 
4.6. If implemented, there is still a risk in relation to Reducing Class Contact Time for
teachers, and national discussions on this are ongoing. Reducing the amount of time
that a teacher is in the classroom would mean a requirement for additional teachers
to be brought into the system.  This would have financial implications for councils
including South Lanarkshire Council.  Cosla and local government are engaged with
the Scottish Government on this matter, and local government have made it clear
that funding would have to be provided by the Scottish Government. If the Scottish
Government do not fully fund the cost of RCCT, then this will be added to the
Council’s Budget Gap and further savings would be required to balance the Council’s
Budget.  Updates will be provided as this matter progresses. 
4.7. Additional Support for Learning: The 2025/2026 Settlement allocated a national
amount of £28 million to “develop” the Additional Support for Learning (ASL)
workforce. The Council’s share is £1.8 million.  Education Resources are finalising
how the funds will be spent, with a view to reporting this to the Executive Committee
in September.  This will include additional staffing and consideration of additional
costs associated with ASL, including the increased cost of pay. 
4.8. Packaging Extended Producer Responsibility:  New waste Regulations came into
force on 1 January 2025 and are designed to drive producers of packaging waste to
reduce the amount of waste.  The scheme is being managed by DEFRA and the
Council has had confirmation of £7.716 million funding for 2025/2026.  While there is
no certainty of the funding beyond 2025/2026, proposals are in place to meet known
obligations this year via an increase to the annual staffing structure at a cost of
£0.305 million, over a 2-year period (total cost estimate of £0.610 million).  These
posts have been approved by the Community and Enterprise Resources Committee
(12 August 2025).    
22

Page 23

4.9. The remaining pEPR funding of £7.106m will be allocated to the Community and
Enterprise budget for costs associated with the collection of household packaging
waste as required by the scheme. By funding these core Council costs already being
incurred by the Resource, this will release core Council budget in 2025/2026 only.
This will result in an underspend of £7.106 million anticipated in the current financial
year and as noted above, given the pressures arising from the higher than budgeted
pay award, it is recommended that this be transferred to Reserves, and
consideration given to its use to support the Budget Strategy – with a view to setting
this aside for the cost of the 2025 Pay Award in future years. 
5. Housing Revenue Account Position
5.1. As at 11 July 2025, Appendix 2 of the report shows a break-even position on the
Housing Revenue Account. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. As detailed in sections 4 to 5 of the report. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
the probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
9.2. There are no implications for sustainability in terms of the information contained in
this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 July 2025  
23

Page 24

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Community and Enterprise Resources Committee, 12 August 2025 
List of Background Papers
 Financial Ledger and budget monitoring results to 11 July 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
24

Page 25

Note:  While the Year to Date Actual at period 4 presents a net surplus position (£55.138m), this is timing only.  The forecast outturn
shows a breakeven position (sections 4.1).
Appendix 1
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 128.335 128.335 0.000 0.00% 22.987
Facilities Waste and Grounds 79.406 79.113 0.293 0.37% 13.229
Leisure and Culture 19.788 19.788 0.000 0.00% 4.299
Planning and Regulatory Services 4.786 4.661 0.125 2.61% 0.995
Enterprise and Sustainable Development 6.140 5.980 0.160 2.61% 1.814
Roads, Transportation and Fleet 18.215 18.793 (0.578) (3.17%) 2.650
Education Resources 487.722 487.722 0.000 0.00% 122.859
Education 487.722 487.722 0.000 0.00% 122.859
Finance and Corporate Resources 39.784 39.784 0.000 0.00% 18.683
Finance Services - Strategy 2.018 2.071 (0.053) (2.63%) 0.952
Finance Services - Transactions 17.258 17.051 0.207 1.20% 7.692
Audit and Compliance Services 0.339 0.301 0.038 11.21% 0.131
Information Technology Services 7.775 7.775 0.000 0.00% 5.488
Communications and Strategy Services 2.257 2.242 0.015 0.66% 0.820
Administration and Licensing Services 3.798 3.905 (0.107) (2.82%) 1.728
Personnel Services 6.339 6.439 (0.100) (1.58%) 1.872
Housing & Technical Resources 12.330 12.330 0.000 0.00% 5.200
Housing Services 8.681 8.720 (0.039) (0.45%) 3.965
Property Services 3.649 3.610 0.039 1.07% 1.235
Social Work Resources 246.649 246.649 0.000 0.00% 80.860
Performance and Support Services 5.872 5.872 0.000 0.00% 1.598
Children and Families 50.337 50.337 0.000 0.00% 13.501
Adults and Older People 189.707 189.707 0.000 0.00% 65.384
Justice and Substance Misuse 0.733 0.733 0.000 0.00% 0.377
Joint Boards 1.629 1.629 0.000 0.00% 0.501
916.449 916.449 0.000 0.00% 251.090
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 916.449 916.449 0.000 0.00% 251.090
CFCR 6.610 6.610 0.000 0.00% 0.000
Loan Charges 37.249 37.249 0.000 0.00% 0.000
Corporate Items 33.084 33.084 0.000 0.00% 0.220
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Total Expenditure 1,020.600 1,020.600 0.000 0.00% 251.310
Council Tax 196.599 196.599 0.000 0.00% 60.492
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (7.623)
171.823 171.823 0.000 0.00% 52.869
General Revenue Grant 453.021 453.021 0.000 0.00% 139.391
Non Domestic Rates 371.110 371.110 0.000 0.00% 114.188
Transfer from Reserves 24.646 24.646 0.000 0.00% 0.000
Total Income 1,020.600 1,020.600 0.000 0.00% 306.448
Net Expenditure 0.000 0.000 0.000 0.00% (55.138)
Period Ended 11 July 2025 (No.4)
Revenue Budget Monitoring Report
SOUTH LANARKSHIRE COUNCIL
25

Page 26

Appendix 2
Revised Projected Projected Year to Date
Annual Outturn Outturn % Note Actual
Budget Variance
Budget Category £m £m £m £m
Employee Costs 15.173 15.120 0.053 0.35% 2.740
Property Costs 61.584 61.584 0.000 0.00% 3.644
Supplies and Services 0.473 0.473 0.000 0.00% 0.065
Transport and Plant 0.195 0.195 0.000 0.00% 0.013
Administration 5.594 5.594 0.000 0.00% 0.109
Payment to Other Bodies 3.271 3.271 0.000 0.00% 0.495
Payment to Contractors 0.100 0.100 0.000 0.00% 0.068
Transfer Payments 0.000 0.000 0.000 0.00% 0.000
Financing Charges 34.875 34.875 0.000 0.00% 0.000
Total Controllable Exp. 121.265 121.212 0.053 0.04% 7.134
Total Controllable Inc. (133.884) (133.831) (0.053) 0.04% (22.389)
Transfer to/(from) Balance Sheet (4.001) (4.001) 0.000 0.00% 0.000
Net Controllable Exp. (16.620) (16.620) 0.000 0.00% (15.255)
Loan Charges 16.620 16.620 0.000 0.00% 0.000
Net Controllable Exp. 0.000 0.000 0.000 0.00% (15.255)
Variance Explanations
There are no significant variances to report.
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 11 July 2025 (No.4)
Housing Revenue Account
26

Page 27

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2025/2026 and Monitoring for Period 4 -
1 April 2025 to 11 July 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2025 to
11 July 2025 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r
(1) that the position of the General Fund Capital Programme (Appendices 1 to 3)
and the Housing Capital Programme (Appendix 4), as at 11 July 2025, be
noted;
(2) that the adjustments to the General Fund programme, listed at Appendix 1, be
approved; and
(3) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 11 July 2025 (period 4).  Spending has been split into two separate sections below: 
 General Fund Capital Programme inc. Education, Social Work, Roads and
General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme
4.1. 2025/2026 Budget: The revised programme for the General Fund is £73.834 million
(summarised in Appendix 2).  This revised programme consists of the base budget
plus carry forward projects and adjustments which have been agreed by the Executive
Committee up to and including its meeting on 25 June 2025. 
4.2. The programme of £73.834 million also includes proposed adjustments totalling an
overall increase of £5.736 million.  These are detailed in Appendix 1. 
4.3. The funding available of £73.834 million to support the programme is detailed in
Appendix 3.  
4
27

Page 28

4.4. Delivering and Enabling Commercial Space Programme: As reported to the
Executive Committee on 28 May 2025, £11.076 million was awarded to the Council
from the City Deal Infrastructure Fund which was previously allocated to improvements
in connectivity to Glasgow Airport.  Community and Enterprise Resources identified
projects at Cathcart Road, Rutherglen (£1.113m), Red Tree Labs, Shawfield
Innovation Campus (£9.000m) and Industrial Unit Upgrade & Retrofit (£0.963m). 
4.5. Business cases and multi-year spend profiles are being progressed.  Once complete
and agreed with the Glasgow City Region Project Management Office, the relevant
budget will be brought into the 2025/2026 Capital Programme as required, with the
remainder profiled into future years. 
4.6. Vacant Derelict Land Fund (VDLF):  Community and Enterprise Resources
Committee (August 2025) have approved the allocation of the 2025/2026 VDLF for
Clyde Cycle Park (£0.400 million) and Clyde Climate Forrest (£0.025m). 
4.7. The Council had previously identified an allocation of £0.200 million for Clyde Cycle
Park which can be replaced by £0.200 million of the VDLF allocation above.  The
Council’s Capital Programme can reduce by the £0.200 million and the Council can
reduce its borrowing requirement by the same amount. 
4.8. The Community and Enterprise Resources Committee paper notes that projects are
currently being identified for the balance of VDLF monies (£0.103 million) and will be
presented to a future Committee for approval. 
4.9. Leisure and Culture Transformation Fund:  When the original Transformation
projects were agreed, there remained a balance of unallocated monies.  A list of
projects has now been identified to utilise these unallocated funds, as well as some
of the contingency budget no longer required.  These projects total £1.126 million
and are included in Appendix 1 for consideration. 
4.10. 2025/2026 Forecast:  As noted in 4.1, the total capital spending programme for the
year is £73.834 million. 
4.11. Appendix 3 also shows a forecast for the financial year of £73.834 million. 
4.12. 2025/2026 Actual Position:  Actual spend incurred to the 11 July 2025 totals £5.276
million. 
4.13. Actual funding received to 11 July 2025 is £8.566 million.  This is shown in Appendix
3. Relevant officers will continue to closely monitor the generation of all income
including receipts. 
5. Housing Programme
5.1. 2025/2026 Budget:  Appendix 4 summarises the position on the Housing programme
as at 11 July 2025.  The revised Housing Capital programme for the year is £87.700
million. This includes £0.160 million Scottish Government grant for the Climate
Emergency Fund which has been approved to spend on Council Houses. 
5.2. As reported previously, the programme takes account of the Scottish Government
funding of £1.767 million from the £40.000 million funding for the National Acquisition
Programme in 2025/2026.  This has been used to offset borrowing in line with
anticipated spend for the financial year.  
28

Page 29

5.3. The Affordable Housing Supply funding from the Scottish Government is allocated to
both the Council and Registered Social Landlords (RSLs).  It is anticipated that the
Council will receive approximately £2 million more than originally budgeted in
2025/2026 with RSLs requiring less of the grant available.  Again, this will be used to
offset borrowing in line with anticipated spend for the financial year. 
5.4. Programme funding for the year also totals £87.700 million.  Appendix 4 summarises
the position on the Housing programme as at 11 July 2025. 
5.5. 2025/2026 Forecast:  As noted in 5.1, the total capital spending programme for the
year is £87.700 million.  Current estimates from Resources have identified an outturn
of £87.700 million for the year. 
5.6. 2025/2026 Actual Position:  Spend to 11 July 2025 on the Housing Capital
Programme amounts to £14.380 million. 
5.7. As at 11 July 2025, £14.380 million of funding had been received. 
5.8. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. None 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 July 2025 
29

Page 30

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 25 June 2025
 Executive Committee, 28 May 2025
 Community and Enterprise Resources Committee, 12 August 2025 
List of Background Papers
 Capital Ledger prints to 11 July 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
30

Page 31

APPENDIX 1
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 11 JULY 2025 
Proposed Adjustments 
Community and Enterprise Resources 
Braidwood Play Area Redevelopment 
Approval is sought to increase the 2025/2026 capital programme by £0.123 million
for the redevelopment of Braidwood play area funded from a range of funding
sources including REF and Developer Contributions. 
Wooddean Phase 2
Approval is sought to increase the 2025/2026 capital programme by £0.146 million
for the construction of a wetland, boardwalk, path network and sensory seating area
funded via Land Trust (£0.050 million), Wooddean Community Project Organisation
(£0.043 million) and Developers Contributions (£0.053 million). 
£0.123m 
£0.146m 
SLC Industrial Infrastructure – Energy Efficiency (Cathcart Road)
This project has been delayed due to issues identified by SEPA, which requires the
design team to undertake significant additional works and produce a range of
additional supporting information.  This has caused a delay to the programme, and
specifically the tendering and appointment of the contractor impacting upon the level
of spend this financial year.   
Approval is therefore sought to slip £0.590 million into financial year 2026/2027 to
reflect the timing of expenditure for this project. 
Leisure and Culture Transformation Fund 
Following consideration, a number of projects are proposed for approval and will be
funded by the Transformation Fund.  These are listed below: 
Approval is sought to increase the capital programme by £0.400 million for the
Whitemoss Pitch, East Kilbride project to replace the existing 3G pitch with a
modern, high-quality surface that will significantly improve capacity, reliability, and
overall quality. 
Approval is sought to increase the capital programme by £0.200 million for a
Digital Inclusion project implementing digital support hubs and device lending
libraries in communities, running awareness campaigns to inform residents about
the available digital inclusion resources and support services across partners. 
Approval is sought to increase the capital programme by £0.400 million for the
Hamilton Water Palace project to replace the floating floor. 
Approval is sought to increase the capital programme by £0.126 million for high
priority projects, that will make a difference to useable spaces. These are:  
South Lanarkshire Lifestyles – Lanark, Chiller Unit (£0.050m), Rutherglen Library,
Automatic Door Mechanisms (£0.006m), South Lanarkshire Lifestyle - Eastfield,
Air Handling (£0.020m), Hamilton Town House, Heiton Room Ceiling, (£0.020m)
and Dollan Aqua Centre, Entrance Area Heating (£0.030m) 
(£0.590m) 
£0.400m 
£0.200m 
£0.400m 
£0.126m 
31

Page 32

In addition, following consideration of the profile of spend for the previously approved
Phase 2 projects, approval is sought to increase the capital programme by £1.857
million to reflect the anticipated spend in 2025/2026.   
The remaining spend of £1.430 million is profiled into 2026/2027. 
2025/2026 Place Based Investment Fund
Funding from the Scottish Government of £1.213 million has been confirmed for the
2025/2026 Place Based Investment Programme.  The funding will provide support
for projects at Larkhall Leisure Centre (£0.940 million – this is already included in the
funding package for this project) and Cathcart Road, Rutherglen / Industrial refit
project (£0.273 million – this is in addition to the other funding noted earlier). 
Approval is sought to increase the 2025/2026 capital programme by £1.213 million
and slip this into financial year 2026/2027 reflecting the timing of when the funding is
required for these projects. 
Civic Centre/EK Town Centre Masterplan
Profiling of spend for the year has been completed by the contractor to include
demolition, survey, consultant and legal fees.  Approval is sought to increase the
2025/2026 capital programme by £2.117 million, funded by UK Shared Prosperity
Funds (£0.350m) and City Deal (£1.767m). 
People and Place Local Authority Grant
Funding has been made available to take forward active travel initiatives supporting
active and sustainable travel, promoting initiatives to increase the frequency of active
travel journeys, by developing walking routes to schools, parks and in town centres.   
Approval is sought to increase the 2025/2026 capital programme by £0.210 million
which will be funded by Transport Scotland through the People and Place Local
Authority Direct Award 2025/2026. 
SPT Regional Congestion Reduction Measure
Funding has been made available to deliver congestion reduction measures at various
defined locations.  These measures focus on enhancing traffic flow and capacity
through junction upgrades, improved or new traffic signals, and urban traffic control
systems. Project identified to upgrade the traffic signals at the junction of High Blantyre
Road / Hunthill Road / Douglas Street Blantyre and introduce MOVA (Microprocessor
Optimised Vehicle actuation) to the junction, this additional software can better
manage queues, reduce delays and optimise the traffic signal timings. 
Approval is sought to increase the 2025/2026 capital programme by £0.250 million
funded by Strathclyde Partnership for Transport (SPT) with grant funding claimed
retrospectively upon financial completion. 
City Deal – Greenhills Road
Landscape works will be carried out by Grounds Services with cost of works
covering work undertaken in financial years 2024/2025 and throughout 2025/2026,
funded through Greenhills/Strathaven Road City Deal. 
Approval is sought to increase the 2025/2026 capital programme by £0.270 million. 
£1.857m 
£1.213m
(£1.213m) 
£2.117m 
£0.210m 
£0.250m 
£0.270m 
32

Page 33

Housing & Technical Resources 
Net Zero Innovation Fund
The Amendment to the Council Budget for 2024/2025 approved an allocation of
£0.150m to be used to develop ‘spend to save’ and sustainable income generation
options for South Lanarkshire Council over more than one financial year.  Proposed
energy efficiency projects include upgrade of existing lighting to LED for John Wright
Sports Centre (£0.070 million) and Hallside Primary School (£0.025 million) and
feasibility studies for Mini Heat Network in Carluke (£0.030 million) and Heat Network
in East Kilbride (£0.025 million). 
Approval is sought to increase the 2025/2026 capital programme by £0.150 million. 
Education Resources 
St John Ogilvie High School Capacity Improvements Phase 2
Works are planned to improve the Education accommodation at St John Ogilvie High
School.  The Phase 2 works will convert existing storage accommodation into
additional pupil changing facilities, to alleviate congestion in the PE timetable.   
Approval is sought to increase the 2025/2026 capital programme by £0.052 million
which will be funded by Developers Contributions. 
£0.150m 
£0.052m 
Minor Adjustment (including realignment) £0.025m  
TOTAL ADJUSTMENTS £5.736m 
33

Page 34

APPENDIX 2 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 11 JULY 2025 
£m  
Total Base Budget (including carry forward from 2024/2025)  68.098 
Proposed Adjustments – Period 4 5.736  
Total Revised Budget  73.834   
2025/26 Budget  Period 4
Proposed
Adjustments
Revised 
2025/26 
Budget 
Resource  £m £m £m
Community & Enterprise 50.793 5.375 56.168
Education 5.759 0.211 5.970
Finance & Corporate 0.545 - 0.545
Housing & Technical 10.664 0.150 10.814
Social Work 0.337 - 0.337
TOTAL CAPITAL PROGRAMME 68.098 5.736 73.834 
34

Page 35

APPENDIX 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 11 JULY 2025 
2025/26
Original
Estimate
inc C/F 
2025/26
Revised
Budget 
2025/26
Forecast 
Spend 
2025/26
Forecast
Variance 
2025/26
Actual to
11/07/25      
Expenditure £m £m £m £m £m      
General Fund Programme 64.188 73.834 73.834 - 5.276 
Income
2025/26
Budget
2025/26
Revised
Budget  
2025/26
Actual
To
11/07/25         
£m         £m   £m
Prudential Borrowing 17.192 21.602   0.000
Developers Contributions 1.965 4.718   0.000
Partners  0.450 2.222   0.276
Scottish Government:     
- Capital Grant 27.467 27.467   6.867 
- Vacant & Derelict Land 1.447 1.502   0.994 
- Place Based Investment  0.589 0.589   0.014
Levelling Up Fund 7.700 7.700   0.004
Capital Receipts 0.700 0.700   0.411
Specific Reserves 0.038 0.724   0.000
Revenue Contribution 6.610 6.610   0.000      
TOTAL FUNDING 64.188 73.834   8.566  
35

Page 36

APPENDIX 4 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26       
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 11 JULY 2025 
2025/26
Annual 
Budget  
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26
Actual to
11/07/25 
£m £m £m £m
Expenditure 
2025/26 Budget  87.700  87.700  -  14.380     
2025/26
Annual 
Budget  
2025/26
Actual to
11/07/25 
£m   £m
Income         
Capital Funded from Current Revenue 35.633   8.090
Prudential Borrowing 26.948   2.581
Scottish Government Specific Grant:    
- New Build 18.839   0.000
- Open Market Purchase Scheme 6.000   3.629
- Mortgage to Rent 0.120   0.000
Other Income 0.160   0.080 
87.700   14.380 
36

Page 37

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (28 May 2025)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £3.272 million, detailed in appendices 1 and
2, be noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in appendices 1 and 2 of the report. The
report details additional funding that has been reported by Resources as part of the
additional resources’ notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £1.809 million has been identified for 2025/2026. This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £1.463 million has been identified for 2025/2026. This is
detailed in Appendix 2. 
5.3. The total additional funding is therefore, £3.272 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval.  
5
37

Page 38

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 28 May 2025 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
38

Page 39

Appendix 1 
Additional Revenue Funding  
Resource  Description  2025/2026
£m 
Total
£m 
Method
Education Scottish Milk and Healthy Snack Scheme
(SMHSS) 
Funding of £1.076m 2025/26 provided to
support the delivery of the SMHSS. To provide
as many eligible children as possible who are
attending regulated pre-school day care
settings for 2 hours or more milk (or an
approved alternative) and a healthy snack, and
to be acquiring healthy eating habits for the
future. 
1.076 1.076 Scottish
Government
Education Bright Start Breakfast 
Funding of £0.146m for 2025/26 academic
year to expand existing breakfast club
provision for primary aged children and/or
children attending special schools.   
0.146 0.146 Scottish
Government
Social
Work
Children’s Social Care Pay Uplift in
Commissioned Services 
Funding provided to enable the pay uplift for
eligible children’s social care workers in
private, voluntary and independent sectors,
which was announced in the Programme for
Government 2024-25. This funding will deliver
a minimum rate of £12.60 per hour for eligible
staff. Overall, £1.811m is being provided with
£1.224m already baselined within the
2025/2026 budget. 
0.587 0.587 Scottish
Government 
TOTAL REVENUE FUNDING 1.809 1.809 
39

Page 40

Appendix 2 
Additional Capital Funding 
Resource  Description  2025/2026
£m 
Total
£m 
Method
Community &
Enterprise
Place Based Investment Funding 
The funding will provide support for
projects at Larkhall Leisure Centre
(£0.940 million – this is already included
in the funding package for this project)
and Cathcart Road, Rutherglen /
Industrial refit project (£0.273 million –
this is part of the overall funding
package). 
1.213 1.213 Scottish
Government –
Place Based
Investment
Programme
Community &
Enterprise
SPT Regional Congestion Reduction
Measure 
Funding has been made available to
deliver congestion reduction measures
at various defined locations.  These
measures focus on enhancing traffic
flow and capacity through junction
upgrades, improved or new traffic
signals, and urban traffic control
systems. 
0.250 0.250 Strathclyde
Partnership for
Transport (SPT) 
TOTAL CAPITAL FUNDING 1.463 1.463 
40

Page 41

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Local Action Fund – Further Spend Proposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise, and seek the approval of the Committee in respect of, the proposals in
relation to the Local Action Fund spend of £50,000 in each of the Council’s 20
geographical Wards which were not approved at the 25 June meeting of the
Committee
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the proposals for the agreed Local Action Fund (LAF) submissions in
respect of Ward 13 (Cambuslang West), Ward 16 (Bothwell and Uddingston)
and Ward 20 (Larkhall), as detailed in Appendix 1 to this report, be approved; 
(2)  that authority be delegated to the Executive Director (Finance and Corporate
Resources), in consultation with the ward members and Chair and Depute
Chair of this Committee, to finalise how the LAF will be spent in Ward 11
(Rutherglen South); 
(3) to note that the proposals for Clydesdale East (Ward 3) will be brought back to
a future meeting; and 
(4) that as there is more than one proposal for 5 Wards, as detailed in Appendix 2
to this report, consideration be given and a decision taken to approve a proposal
for each of the following Council Wards: 
(a)  Clydesdale North (Ward 2);
(b)  Clydesdale South (Ward 4);
(c)  Avondale and Stonehouse (Ward 5);
(d)  East Kilbride West (Ward 9); and
(e)  Rutherglen Central and North (Ward 12). 
3. Background
3.1. As part of the Budget Amendment approved by Council on 26 February 2025, it was
agreed that £50,000 would be provided for each of South Lanarkshire’s 20 Wards to
be approved by the Executive Committee, following input from local councillors.  
6
41

Page 42

3.2. As previously reported to this Committee on 25 June 2025, Members were issued
with guidance to assist in their process of considering how to spend the monies in
their local ward.  Councillors were encouraged to discuss possible suggestions with
their fellow ward councillors and, if able, agree a single suggestion for their ward. A
form was also issued to Members to complete with their spend proposals, and a
timeline was set for these proposals to be submitted, to allow time for officer
consideration/input to ensure the project was deliverable, before collating them into a
summary for consideration by this Committee 
3.3. On 25 June, the Committee approved Local Action Fund proposals for 13 Council
Wards, it being noted that proposals for the remaining 7 wards would be submitted to
a future meeting of the Committee. This report now provides an update on these
further proposals. 
4. Ward Specific Proposals for Approval
4.1. There are 4 Wards where there is an agreed proposal from the Ward Members.  These
are detailed in Appendix 1.  This includes an agreement on the remaining £25,000 for
Bothwell and Uddingston (Ward 16). In addition, as noted in the previous report to
Executive Committee on 25 June, it has now been confirmed that the unallocated
balance of £6,000 for Cambuslang West (Ward 13) will be used for a community skip
project.   
4.2. In respect of Rutherglen South (Ward 11), the costing of Members’ proposals is
being finalised regarding how the balance of £23,200 not agreed at the June meeting
of the Committee, should be spent.  To avoid a decision having to wait until the next
meeting of the Committee, it is proposed that authority be delegated to the Executive
Director (Finance and Corporate Resources) to finalise how the Local Action Fund
will be spent for this Ward, in consultation with the Ward members and the Chair and
Vice-Chair of the Committee.   
4.3. On this basis, the Committee is asked to approve the agreed proposals in Appendix
1 as well as the proposal for delegated authority for Ward 11 (Rutherglen South). 
4.4. For Clydesdale East (Ward 3), members are still considering spend options for their
Local Action Fund monies.  As their deliberations continue, it is proposed that the
outcome of their decision will be brought back to a future meeting of this Committee.   
4.5.  There are 5 wards where there is more than one proposal from Ward Members for the
use of the Local Action Fund. These are detailed in Appendix 2. The Committee is
asked to consider the submissions and approve a proposal for each Ward. 
4.6. Members’ attention is drawn to one proposal for Ward 12, Rutherglen Central and
North.  One of the proposals, the construction and maintenance of a public toilet at
Overtoun Park is not deemed competent on the basis that there would be ongoing
revenue consequences of this spend which are not funded.  There is, however, the
possibility of a local comfort scheme being established in the vicinity, supported by a
local community group, which local members could explore further. There would
also, potentially, be the option of a temporary public toilet being rented by a local
community group, the cost being met by the Local Action Fund.  
42

Page 43

4.7. Where proposals have been agreed by Committee, they have been added to the
programme of spend for the current year, to be taken forward for implementation by
officers in the normal way. Where grants to third party organisations have been agreed
they have likewise been taken forward by officers, in line with existing procedures for
the issuing of grants. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. As detailed in section 4 of the report, each Ward has been allocated £50,000, a total
of £1.0 million for all 20 Wards. 
6.2. As part of this paper, agreed proposals have been identified for 4 Wards totalling
£104,200. These are included in Appendix 1 for approval, including an assumption
that the remaining £23,200 is spent in Ward 11. 
7. Climate Change, Sustainability and Environmental Implications
7.1. Any implications for climate change, sustainability or the environment from the
proposals included in Appendix 1 are anticipated to be minimal. 
8. Other Implications
8.1. A risk associated with spend on the Ward proposals is that there is an overspend. The
risk has been assessed as low given the detailed budget management applied across
the Resources and projects.  The risk is managed through financial monitoring
arrangements at which any variance is analysed. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
43

Page 44

Previous References
 South Lanarkshire Council – 26 February 2025
 Executive Committee - 25 June 2025 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Iain Strachan, Head of Administration & Legal Services
Ext:  4658 (Tel:  01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk
44

Page 45

Appendix 1
Agreed Local Action Fund Submissions 
Ward
No
Ward Name Proposed use of Local Action Fund
11 Rutherglen
South 
All Ward members had agreed a package of proposals including the proposal to
split the funds between various improvements across the area totalling £26,800,
as approved by the Executive Committee on 25 June. 
Members are still obtaining costings and discussing potential areas of spend with
relevant officials with a view to spreading the benefit of the Local Action Fund
across the Ward. 
As noted in the covering report, it is recommended that authority is delegated to
the Executive Director (Finance and Corporate Resources) to finalise how the
£50,000 allocation of Local Action Fund monies will be spent for this Ward, in
consultation with the Ward members and the Chair and Vice-Chair of the
Committee. 
13 Cambuslang
West 
As noted in the previous report to Executive Committee on 25 June, it has now
been confirmed the unallocated balance of £6,000 will be used for a community
skips project. 
16 Bothwell and
Uddingston 
All members have agreed the proposal to allocate the remaining half of the fund
(£25,000) to local group Grow Uddingston, provisionally allocated as follows: 
£9,000 – Heritage Trail
£7,000 – Community Orchard
£9,000 – Community Garden 
The community orchard and garden are subject to arrangements being agreed
by Grow Uddingston for the use of suitable local sites, failing which funds will be
used towards the Heritage Trail or other activities to support the work of Grow
Uddingston for the benefit of the local community. 
20 Larkhall All members have agreed the proposal that the £50,000 to be shared between
the 10 schools within the Ward, being Craigbank, Glengowan, Machanhill.
Hareleeshill, Quarter, Dalserf, Netherburn, St Mary’s and Robert Smilie Memorial
primary schools and Larkhall Academy. 
There was an alternative proposal that the Local Action Fund be used towards a
feasibility study for the potential of an upgrade to the cinder running track at
Larkhall Academy. However, this proposal has been withdrawn and the study will
be commissioned using alternative funding. 
45

Page 46

Appendix 2
Wards with more than one Local Action Fund Proposal 
Ward
No
Ward Name Proposed use of Local Action Fund
2 Clydesdale
North
There are two proposals. 
The first proposal is that £50,000 be used for play park improvements within the
Ward. 
The second proposal is that £30,000 be used for play park improvements and
£20,000 for spring bulb/perennial planting within the Ward.
4 Clydesdale
South 
There are two proposals. 
The first proposal is that £50,000 be allocated as a grant to Hollandbush Golf
Course for use as a CAT Transition Fund. 
The second proposal is that £50,000 be allocated as a grant to Blackwood &
Kirkmuirhill Resilience Group to support local youth development.
5 Avondale and
Stonehouse 
There are three proposals. 
The first proposal is that the Local Action Fund be used to provide funding
towards the renewable energy system which would form part of the new multi-
sport facility proposed by Strathaven Rugby Club (£50,000). 
The second proposal is to split the funds between, Stonehouse Community
Council to install benches (£10,000), renovate or purchase of benches and/or
bird proof litter bins in Strathaven (£10,000), provide and install electronic notice
boards in Stonehouse (£10,000) and Strathaven Rugby Club for renewable
energy project (£20,000). 
The third proposal is to split the funds between Auld Stanehoose Café to provide
disabled access (£10,000), Stonehouse Community Council to purchase and
install benches in the village (£10,000), Strathaven Community Council to
purchase and install disabled friendly play equipment (£10,000) and Chapelton
Bowling Club to aid the development of extending the clubhouse (£20,000).
9 East Kilbride
West
There are two proposals. 
The first proposal is that £50,000 be used for accessible play park improvements
within the Ward. 
The second proposal is that £45,000 be used for accessible play park
improvements within the Ward and £5,000 for the planting of fruit trees in the
Ward.
12 Rutherglen
Central and
North 
There are two proposals. 
The first proposal is for the construction and maintenance of a public toilet at
Overtoun Park (£50,000). 
The second proposal is to split the funds between the following recipients:
• Universal Connections (£12,000), 
• The High Backs (£7,000 to the men’s group and £4,000 to the after-
school club. Total of £11,000), 
• Rutherglen 900 for community projects (£10,000), 
• £5,000 for each of the three primary schools, Bankhead, Burgh and St
Columbkille’s (£15,000), and
• Rutherglen Community Carers (£2,000). 
46

Page 47

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Administration and Approval of Firework Control
Zones in South Lanarkshire 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide an update on the requirements of Firework Control Zones from the
Fireworks and Pyrotechnic Articles (Scotland) Act 2022
 seek approval for the proposed approval processes relating to Firework Control
Zones 
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:- 
(1) that the overview of the requirements of the Fireworks and Pyrotechnic Articles
(Scotland) Act 2022 be noted; and
(2) that the proposed approval processes for Firework Control Zones in South
Lanarkshire, as detailed in Section 6, be approved.  
3. Background
3.1. The Fireworks and Pyrotechnic Articles (Scotland) Act 2022 introduced a range of
restrictions and requirements on the use of fireworks across Scotland. This included
stricter criteria on who can buy and sell fireworks, and how and when they can be
used. 
3.2. A key aspect of the legislation was the introduction of discretionary powers for local
authorities to designate Firework Control Zones (FCZs). This was followed up by local
authority guidance which was published in 2024. 
4. Overview of Firework Control Zones
4.1. An FCZ is an area within a local authority's boundaries in which it is a criminal offence
for a member of the public to ignite a firework, including on private property such as a
garden. It is also an offence to set off a firework into the boundaries of a zone; or to
knowingly or recklessly throw or cast a lit firework into a zone.  
7
47

Page 48

4.2. An FCZ can be established if either: 
1. A local authority, working with its community safety partners, considers it to be
appropriate to assist in tackling disorder or safety issues relating to fireworks. 
2. An established community group within a local authority area requests a zone to
be put in place through an application process administered by the local authority. 
4.3. Where a community group request an FCZ, the local authority must assess and
determine whether the legislative threshold would be met, with the proposed approach
for this assessment detailed in Section 6. 
4.4. FCZs are not intended to be a catch-all solution to deal with issues involving fireworks
and it is expected that a zone would be utilised alongside other preventative and
enforcement tools to have maximum effect. 
4.5. A local authority can consider an FCZ, or a community may request an FCZ for the
following reasons:
 misuse of fireworks/injuries
 impact on vulnerable groups
 environmental protection
 animal welfare 
4.6. Prior to implementation of an FCZ, the local authority must consult with those who may
be impacted, including all of those who reside or work within the proposed area. It
must also publish outcomes of all applications and the consultation process, as well
as co-ordinate regular reviews of any FCZs in place. 
4.7. Once established, the responsibility of enforcing an FCZ is for Police Scotland. Public
events, such as licensed firework displays, are exempt if they fall within an FCZ. 
4.8. The Scottish Government has confirmed that some funding will be available to assist
local authorities in the development of FCZs during 2025/2026, as detailed at section
9.2. 
5. Current Position
5.1. Established in 2018, the Council currently co-ordinates a seasonal Bonfire Planning
Group to ensure an effective partnership approach to tackling anti-social behaviour
associated with bonfires and fireworks. With representation from key community safety
partners including Police Scotland, the Scottish Fire and Rescue Service and a range
of services across the Council, the group co-ordinates preventative and reactive
actions to reduce risks and disorder around October and November each year. 
5.2. The approach established in South Lanarkshire has previously been recognised as a
model of good practice by the Scottish Government and the Scottish Fire and Rescue
Service, with regular evaluation taking place by the partners involved. 
5.3. Through discussions with Council services and community safety partners involved
with the Bonfire Planning Group, and discussions with partner agencies at the Safer
South Lanarkshire Board, it is considered that there is currently no identified need for
the immediate implementation of a local authority led FCZ in South Lanarkshire.  
48

Page 49

5.4. This position is, however, subject to regular review, with any future FCZ proposals to
be considered in line with the proposed approval process set out in section 6. 
6. Proposed Approval Process
6.1. To ensure alignment with wider considerations and issues relating to the misuse of
fireworks and bonfires, it is proposed the existing Bonfire Planning Group structure will
be utilised for the initial assessment as to whether an FCZ could be appropriate. 
6.2. This initial assessment will be to identify whether there is merit in progressing to a
consultation, or utilising other established mechanisms and approaches to tackle
reported or identified disorder. 
6.3. Should the Council or a community propose the establishment of an FCZ as an
appropriate mechanism to tackle identified disorder, consultation and publication
arrangements will be progressed in line with the timescales set out in Scottish
Government guidance. 
6.4.  Following the consultation period, the Bonfire Planning Group will reconvene to assess
the responses which will inform a recommendation to progress or reject the
application. 
6.5. For any community led FCZs deemed not appropriate or valid to progress into public
consultation at the initial Bonfire Planning Group assessment, the Executive Director
(Housing and Technical Resources), in conjunction with the Head of Legal and
Administration Services, will advise the applicant of this outcome, alongside an offer
to discuss the issues relating to fireworks raised by the applicant(s). This discussion
will be led by the most appropriate Council service that relates to the reason for the
application. 
6.6. Given the geographical nature of any FCZ and both the benefits and implications it
can have locally, this recommendation will be made to the relevant Area Committee
that covers the proposed FCZ area. The recommendation will be presented by the
Executive Director (Housing and Technical Resources) to approve or reject, with Area
Committee determining the final outcome. 
6.7. Scottish Government guidance does not require a dedicated appeals process to be
established for FCZs and, as such, any applicant who disagrees with the outcome
itself or the process through which that outcome has been reached would, however,
have recourse to judicial review. 
6.8. To facilitate community led applications, the Council’s website has been updated to
provide a background to FCZs and how a community can request one and who to
contact in the Council.  An online application form has also been developed for use
should the proposed approval route be agreed. 
6.9. The use of Area Committees to approve an FCZ will require an update to Section 3 of
the Terms of Reference for The Council, Committees and Associated Forums (as
approved at the meeting of South Lanarkshire Council on 11 September 2024). This
proposal to update the Area Committees’ Terms of Reference will be presented to the
next scheduled meeting of South Lanarkshire Council on 1 October 2025.  
49

Page 50

6.10. In the interim period, prior to the formal revision of the Terms of Reference of the Area
Committees, it is proposed that any recommendation(s) to implement a Council or
community led FCZ will be submitted to Executive Committee for approval. Any
recommendation(s) would only occur following the initial Bonfire Planning Group
assessment and consultation process being concluded. 
7. Next Steps
7.1. Subject to approval from Executive Committee, administrative arrangements to amend
Section 3 of the Terms of Reference for The Council, Committees and Associated
Forums will be progressed. This will be submitted to South Lanarkshire Council on 1
October 2025 for approval. 
7.2. FCZs will continue to be considered by the Council and its community safety partners
through the Bonfire Planning Group in the event that the misuse of fireworks increases
and the use of a FCZ is determined as an appropriate and proportionate response. 
7.3. The Council’s website will be updated to reflect the proposed approval process. 
8.  Employee implications
8.1. There are no employee implications associated with this report.
9. Financial implications
9.1. The Scottish Government has estimated that the cost to a local authority to establish
a single FCZ is £24,931. The actual cost associated with the administration and
enforcement of FCZs will be monitored closely and incorporated as appropriate within
established financial monitoring reports. 
9.2. On 7 July 2025, the Minister for Victims and Community Safety confirmed that limited
funding has been secured by the Scottish Government for 2025/2026 to support the
designation of FCZs by local authorities. To access this funding, local authorities must
notify the Scottish Government that they intend to consult on or implement an FCZ by
1 December 2025. 
9.3. No funding beyond 2025/2026 has been secured by the Scottish Government to
support local authorities in the implementation of FCZs. 
10. Climate Change, Sustainability and Environmental Implications
10.1. This report introduces a new function for the Council. An Integrated Impact
Assessment has been completed on the proposed approach, setting out potential
sustainability implications from its introduction. 
10.2. This identified that the introduction of this proposed approach would not adversely
impact the council’s statutory duties in relation to the Climate Change (Scotland) Act
2009. 
11. Other Implications
11.1. A key risk relating to FCZs is it is unknown how many applications will be submitted
by established community groups. Resource requirements will continue to be
monitored in relation to FCZs. 
50

Page 51

12. Integrated Impact Assessment and Consultation Requirements
12.1. This report introduces a new function for the council. An Integrated Impact
Assessment has been completed on the proposed approach, setting out potential
implications from its introduction in South Lanarkshire. This identified that the
proposed approach would have a predominantly neutral impact across each of the
legislative areas covered by the assessment. 
12.2. The Integrated Impact Assessment can be viewed on the Council's website at
Integrated Impact Assessments. 
12.3. For all Council or community-led applications for FCZ’s, consultation will take place
with relevant partner organisations. 
12.4. For each FCZ deemed appropriate to progress to the public consultation aspect of the
proposed approach, public consultation will take place in alignment with Scottish
Government Guidance. 
Sharon Egan
Interim Executive Director (Housing and Technical Resources) 
28 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 Good quality, suitable and sustainable places to live 
Previous References
 South Lanarkshire Council, 11 September 2024 
List of Background Papers
 Scottish Government, Firework Control Zones: Guidance for Local Authorities, 22
September 2023 www.gov.scot 
Contact for Further Information
If you would like further information, please contact:- 
Jonathan Read, Interim Strategy and Support Manager
Housing and Technical Resources
Email: jonathan.read@southlanarkshire.gov.uk 
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: Consultation on the Scottish Fire and Rescue Service’s
Service Delivery Review 
1. Purpose of Report
1.1.   The purpose of the report is to:- 
 provide an update on the Scottish Fire and Rescue Service’s public consultation on
the strategic review of its service
 seek approval for the Council’s proposed response to the consultation 
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the overview of the Scottish Fire and Rescue Services’ Service Delivery
Review be noted; and
(2) that the proposed response to the consultation, as detailed in Section 8, be
approved. 
3. Background
3.1. The Scottish Fire and Rescue Service (SFRS) began a national Service Delivery
Review (SDR) in 2023 to align resources to operational risk and demand. Financial
pressure was a main driver for the SDR, alongside issues including changing demand,
an ageing estate, and emerging risks. 
3.2. Following this review, ten appliances were removed on a 12-month temporary basis
(among other measures) in September 2023. This affected Hamilton Fire Station,
which lost one rescue pump, and the Council raised concerns regarding this change
at the time through the Safer South Lanarkshire Board (SSLB). 
3.3. In May 2024, the SFRS conducted an online consultative exercise ‘Shaping our
Future: Your Say’, which marked the first stage of engagement by the SFRS in relation
to future service changes. The Council submitted a consultation response further to
approval from the Corporate Management Team on 16 May 2024 and submitted to
the SSLB for noting on 17 June 2024. 
3.4. In April 2025, the SFRS gathered a group of stakeholders to evaluate a list of change
option proposals arising from the SDR. Twenty-three options for change were
identified for consideration as part of a public consultation, affecting over 30 of the 356
fire stations in Scotland.  
8
53

Page 54

3.5. On 29 May 2025, the SFRS Board approved the recommended options and the move
to public consultation. 
3.6. The public consultation opened on 25 June 2025 and will close on 16 September 2025
to consider the 23 options. Public consultation meetings will also be held during that
period. 
3.7. An awareness session for the Council’s elected members was held on 6 August 2025
and a report detailing the proposed response was also presented to the SSLB on 18
August 2025, for noting. 
4. Current Operating Arrangements (Lanarkshire)
4.1. In Lanarkshire, the SFRS operates on a pan-Lanarkshire basis with service provision
structured to cover both local authority areas. 
4.2. Wholetime fire stations are staffed by fulltime firefighters operating on a 24/7 basis
and available for immediate response to incidents. They have at least one appliance
with full capabilities, and some stations will have additional appliances, that may have
differing capabilities, among other specialist vehicles. 
4.3. The SFRS Lanarkshire Division has seven wholetime fire stations, seven on-call fire
stations, and one fire station operating a wholetime/on-call staffing arrangement. It has
22 wholetime appliances, eight specialist appliances, and one Environmental Incident
Support Unit across Lanarkshire at its disposal. 
4.4 Demand on wholetime firefighters is greatest Monday to Friday, 8am to 6pm
(traditional office working hours) when it is most problematic to secure on-call
firefighters. Wholetime firefighters take 2 minutes to mobilise compared to 5 minutes
for on-call firefighters. 
4.5. The SFRS does not respond to incidents from a single fire station. Operational control
deploys the appropriate level of resources to every incident based on pre-determined
response levels. Any large-scale incident is responded to with the necessary
resources, including specialist high-reaching appliances from the local area and
beyond. 
5. Management Information (Lanarkshire)
5.1. The SFRS does not provide publicly available information on specific response time
targets or averages for all incidents. However, a Freedom of Information request in
July 2025 reported the following increases in median response times over the past
decade that shows an increase of 1 minute 29 seconds in the median response for
999 calls and risk-to-life calls.  
5.2. Multiple appliances are often deployed to incidents. The most recent statistics
published by SFRS (2023/2024) report that two or more appliances were deployed in
61.9% of all primary fire responses in South Lanarkshire (58.1%, North Lanarkshire).   
54

Page 55

Table 1: Appliance Deployment
Appliance Deployment North Lanarkshire South
Lanarkshire
All fires 2,108 1,575
Primary fires 571 505
Secondary fires 1,535 1,063
Primary fires as %, all fires 27% 32%
Secondary fires as %, all fires 73% 67%
Dwelling fires as %, all primary fires 44% 47%
Number of additional appliances
deployed (primary fires)
332 312
% fires requiring 2 or more
appliances (primary fires)
58.1% 61.9%
Number of additional appliances
deployed (secondary fires)
150 73
% fires requiring 2 or more
appliances (secondary fires)
9.8% 6.8% 
5.3. The SFRS publishes statistics on the time of day that it receives reported incidents at
a Scottish-level. The most recent published statistics (2023/2024) report that the peak
time to receive reports of a primary fire incident are from late afternoon until mid-
evening. Peak reporting occurs around 6pm. 
6. Service Delivery Review Conclusions (Lanarkshire)
6.1. The SDR conclusions specific to Lanarkshire identified that: 
1. Emergency vehicles are national resources and located across the country. There
is no proposed operational change to existing first appliance arrangements in
Scotland. 
2. There is an imbalance of resources in Lanarkshire where operational demand does
not match where appliances are located. This assessment was based on modelling
carried out using historic incident data, as well as the changing demographic,
environmental and community footprint across Lanarkshire. 
3. The temporary withdrawal of a second wholetime crewed appliance from Hamilton
fire station had minimal impact on response times for first appliances arriving at the
scene. There was an impact on the response times of the second appliance by 64
seconds and there was no evidence of a change to operational outcomes. 
4. Cumbernauld Fire Station’s roof structure is affected by reinforced autoclaved
aerated concrete (RAAC), which needs repaired. In Scotland, temporary safety
measures are currently in place across the 14 fire stations affected to maintain
operations, and a service priority is to address this in all stations affected by RAAC
over a five-year period. 
5. It is not possible to operate two wholetime crewed appliances from Cumbernauld
and begin remedial roof work without having to temporarily relocate Cumbernauld
operations. However, if the crew model for the second appliance changed to a
dayshift crew remedial work could begin and without the need to relocate
operations.  
55

Page 56

6.2. The proposals do not include an option to maintain the status quo in relation to current
establishment resources. The options for change detailed below affect second
appliance and crew shift arrangements for Lanarkshire. If neither of the two Options
are progressed the second appliance will not be reinstated to Hamilton fire station. 
6.3. The temporary withdrawal of the second appliance from Hamilton Fire Station was
predicated on an assessed 13 second increase in second appliance response times,
whereas the evaluation of that change reports a 64 second increase. 
6.4. Whilst there was no change to service response from the temporary second appliance
withdrawal there is no similar reassurance in relation to the impact of those changes.
No supporting data is provided within the Temporary Appliance Review due to
reported “data issues with the Incident Reporting System [that] made it difficult to fully
measure the impact in some areas”. 
6.5. Additionally, no data is provided in the consultation paperwork to understand second
appliance demand in the overall context of incidents reported to the SFRS that may
evidence the rationale for the proposed Options and allow those who wish to respond
to the consultation to fully risk assess the changes being proposed. 
7. Consultation Options
7.1. The 23 options for consideration include: 
 closure, merger, upgrade or rebuild of fire stations
 relocation of emergency vehicles
 new work shift patterns in targeted areas 
7.2. It is proposed to introduce a day shift duty system (DSDS) in targeted areas as well
as develop nucleus crews, which are wholetime firefighters able to be tactically
deployed across an area during the day when on-call availability is most challenging.
Presently in Scotland, there is limited use of the DSDS, and the nucleus crewing model
is untested. The consultation notes the DSDS will operate from 8am until 6pm Monday
to Friday. 
7.3. The SFRS note the proposals will allow new risks to be met and resources matched
to where they are most needed, enabling the SFRS to address climate change,
improve decontamination provision, and invest in technology. 
7.4. SDR Lanarkshire Option 1: 
 Cumbernauld – first appliance wholetime crewed. Second appliance wholetime
crewed but working DSDS pattern and crewed by on-call firefighters outside
those times
 Hamilton – first appliance wholetime crewed. Permanent removal of a second
wholetime appliance
 no change to Bellshill and Lesmahagow resourcing arrangements 
56

Page 57

7.5. SDR Lanarkshire Option 2: 
 Cumbernauld – as Option 1 with first appliance wholetime crewed. Second
appliance wholetime crewed but working DSDS pattern and crewed by on-call
firefighters outside those times
 Hamilton – one appliance wholetime crewed. Second appliance crewed by DSDS
firefighters
 Bellshill – one appliance wholetime crewed. Introduction of an additional second
appliance crewed by DSDS
 Lesmahagow – one appliance on-call crewed. Introduction of an additional crew
of wholetime firefighters working a DSDS pattern able to be tactically deployed
across the Lanarkshire area 
7.6. Option 1 would result in the permanent removal of the second appliance at Hamilton
Fire Station and would change the second appliance crew arrangements at
Cumbernauld Fire Station. This would reduce second appliance resilience in
Lanarkshire and impact on response times in the evenings and weekends. 
7.7. Option 2 would result in a net gain of a second appliance (at Bellshill), which would
enhance provision during dayshift. However, it would reduce second appliance
resilience in the evenings and weekends and impact on response times. On-call
resilience would also be enhanced during the dayshift through the introduction of a
nucleus crew. 
8. Consultation Summary and Proposed Response
8.1. The consultation contains a separate section of questions for each of the affected
SFRS divisions and responses are required in relation to those of interest. 
8.2. The Council’s proposed response is focused only on the options proposal affecting
SFRS Lanarkshire Division. The proposed response was informed by discussions
from an Elected Members’ Awareness Session held on 6 August 2025. 
8.3. A summary of the Council’s proposed response is detailed below: 
1. The Council welcomes the status quo in respect of first appliance resourcing
arrangements.
2. The Council notes the greater reliance placed on on-call provision and seeks
reassurance on the achievability and sustainability of this crewing model in view of
recognised challenges recruiting and retaining on-call firefighters in recent years.
3. The Council welcomes the additional DSDS staffing resilience through the
provision of a nucleus crewing model under Option 2, which would allow wholetime
firefighters working dayshift to be tactically deployed to support on-call stations.
4. The Council welcomes the proposed reinstatement of a second appliance at
Hamilton Fire Station under Option 2. It believes this will better meet current
demand arising from primary fires and evolving demand that Hamilton town centre
regeneration and Community Growth Area expansion plans may create. Despite
this, the Council still has concerns regarding both options, which will reduce the
level of service provision during nights and weekends.  
57

Page 58

5. In the absence of incident data, the Council is unable to comment on the
anticipated impact of the proposal to reduce appliance resilience and alter staffing
arrangements in targeted locations. Under either option response times in the
evenings and weekends will be exacerbated due to the greater mobilisation times
associated with the use of on-call firefighters. The Council is concerned that this
may increase the risk to lives, property, infrastructure and the environment and
remains to be reassured. 
6. The Council is aware that Hamilton’s more central location within Lanarkshire
shortens drive times to neighbouring areas in 13 of the 15 Lanarkshire fire station
locations compared to Cumbernauld that is located to the North of the Division.
Hamilton also sits in the centre of the M74 corridor. The Council believes that
response time within Lanarkshire in the evenings and weekend may be minimised
by locating the second appliance at Hamilton fire station rather than Cumbernauld
Fire Station, and requests that this alternative option is considered. It may also
assist the timely completion of the RAAC works at Cumbernauld Fire Station.
7. The Council notes that of the two available Lanarkshire options, Option 2 is
preferred.
8. If there is no consideration of alternative proposals and subject to the SFRS Board
approval, the Council seeks reassurance that Option 2 is a permanent resourcing
decision under this present review and not temporary until such times as the
Cumbernauld RAAC repair works are completed.
9. Subject to the SFRS Board approval, the Council seeks clarity on anticipated
timescales to fully implement the proposed appliance and staffing changes in
Lanarkshire. 
8.4. The Council’s full proposed response to the consultation has been provided in
Appendix 1. 
9. Next Steps
9.1. Subject to approval from Executive Committee, the Council’s response will be
submitted to the SFRS by 16 September 2025. 
9.2. The SFRS Board will consider feedback obtained from the public consultation exercise
and is anticipated to make its final decision(s) in December 2025. 
9.3. The SFRS anticipates that it will take five years to fully deliver the change programme
and advises that future reviews will be undertaken on a five-yearly basis. Housing and
Technical Resources will continue to monitor national developments in this area and
report any significant implications for the Council and communities to the relevant
management team, committee or board for noting. 
10.  Employee Implications
10.1. There are no known employee implications at this time. Decisions affecting firefighters
is an operational decision for the SFRS.
11. Financial Implications
11.1 There are no known financial implications at this time. 
12. Climate Change, Sustainability and Environmental Implications
12.1.  The SFRS undertook impact assessments including an Island Community Impact
Assessment as part of the SDR. A driver for change is to positively address climate
change and environmental challenges. 
58

Page 59

13. Other Implications
13.1 There are no further known implications at this time. 
14. Integrated Impact Assessment and Consultation Requirements
14.1 The SFRS undertook a full Equality and Human Rights Impact Assessment for each
proposed option and mitigation measures will supplement existing measures to
minimise impact. 
Sharon Egan
Interim Executive Director (Housing and Technical Resources) 
7 August 2025 
Links to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Caring, connected, sustainable communities
 Good quality, suitable and sustainable places to live 
List of Background Papers
 SFRS Consultation Service Delivery Review | Scottish Fire and Rescue Service 
Contact for Further Information
If you want further information, please contact:- 
Alison Mitchell, Strategy Officer (Strategy and Policy Team), Housing and Technical
Resources
Phone: 01698 454035
E-mail: alison.mitchell@southlanarkshire.gov.uk   
59

Page 60

Appendix One: Proposed Council Response to the SFRS Service Delivery Review
2025 
SFRS Perceptions 
Q1 Thinking about the Scottish Fire and Rescue Service (SFRS), how
much do you know about what the SFRS does?
Response A lot [options: a lot, a fair amount, a little, nothing at all]  
Q2 Based on your understanding of the SFRS, what do you think of the
work they do?
Response Very good [options: very good, good, adequate, not very good]  
Lanarkshire Options 
Q1 Prior to this consultation, how much did you know about these
proposed changes? 
Response A fair amount [options: a lot, a fair amount, a little, nothing at all]  
Q2 Considering these two options, do you prefer Option 1, Option 2 or
neither of these options
Response Option 2 [Options: option 1, options 2, neither of these options]  
Q3 What local circumstances do you think should be considered
alongside these proposed changes?
Response The council is concerned about proposals to reduce appliance provision at
Hamilton fire station and believes this will not meet current demand arising
from incidents, nor meet the evolving demand that will be created through
the long-term regeneration plans for the area. 
Hamilton is centrally placed alongside the M74, which is a major national
trade and passenger vehicle route. 
The Hamilton area is highly populated, with 32% of all residential housing
located there. Primarily serviced by Hamilton Fire Station, the area is
currently subject to long-term regeneration to reduce retail floorspace and
repurpose this, including new-build development of approximately 450
homes, development of an urban part, provision of student or hotel
accommodation etc. Various aspects of the regeneration plan are
significant developments and are in different stages of progress to be
completed over a 15-year period.  
Demand for fire service attendance at incidents remains high. SFRS
statistics published in 2023/24 report that South Lanarkshire had a higher
rate of fire incidents than in Scotland (South Lanarkshire 476.9 per 100,000
population; Scotland, 438.2), and 61.9% of all primary fires in the authority
area required more than one appliance in attendance.     
60

Page 61

Q4 Are there any other issues you think SFRS should consider in looking
at these options? 
The council believes it is essential that fire appliances can reach incidents
within a timeframe that prevents/ minimises harm to people and damage to
property and the environment. 
The council is aware that there are a further four fire stations in Lanarkshire
that will continue to provide a second appliance staffed by wholetime
firefighters. However, it would highlight concerns about the 64 second
increase in second appliance response times against an assessed
anticipated increase of 13 seconds which informed the decision to
temporarily withdraw the second appliance at Hamilton fire station. 
The council acknowledges that the crewing arrangements for second
appliances are enhanced under Option 2 vis-à-vis Option 1. It welcomes an
additional second appliance based at Bellshill and the additional resilience
that would be provided to on-call fire stations through the introduction of the
nucleus crew. 
The council would highlight concerns about the reduction in second
appliance service at nights and weekends. It notes that 2023/24 SFRS
statistics highlight that the number of primary fires reported increases from
mid-afternoon before reducing mid-evening and that incident reporting
peaks at 6pm, which coincides with the end of the DSDS. 
In the absence of incident data, the council is unable to comment on the
anticipated impact of the proposal to reduce appliance resilience and alter
staffing arrangements in targeted locations at this time. Under either option
response times in the evenings and weekends will be exacerbated due to
the greater mobilisation times associated with the use of on-call firefighters.
The council is concerned that this may increase the risk to lives, property,
infrastructure and the environment and remains to be reassured. 
The council is aware that Hamilton’s more central location within
Lanarkshire shortens drive times to neighbouring areas in 13 of the 15
Lanarkshire fire station locations compared to Cumbernauld that is located
to the North of the Division. Hamilton also sits in the centre of the M74
corridor. The council believes that response time within Lanarkshire in the
evenings and weekend may be minimised by locating the second appliance
at Hamilton fire station rather than Cumbernauld fire station, and requests
that this alternative option is considered. It may also assist the timely
completion of the RAAC works at Cumbernauld fire station. 
61

Page 62

Service Development Perceptions 
Q1 As part of this consultation, SFRS will be holding a series of public
meetings from July to September 2025 to discuss possible changes to
SFRS services in potentially impacted areas (locations and dates are
available on the information page). Have you attended or do you plan to
attend a public meeting about proposed changes to SFRS services in your
area?
Response Have attended [options: plan to attend, have attended, have not attended,
do not plan to attend] 
Q2 To what extent do you support or oppose SFRS undergoing a Service
Delivery Review? 
Response Strongly support [options: strongly support, somewhat support, neither
support or oppose, somewhat oppose, strongly oppose, don’t know, prefer
not to say]  
Additional
comments
Please provide any other comments that you wish SFRS to consider: 
The council welcomes the decision that arrangements regarding first
appliances remains unchanged, which provides reassurance. 
The council seeks reassurance that the on-call crewing model is achievable
and sustainable against reported recruitment and retention challenges to
the on-call system. 
The council is aware that feedback provided during the stakeholder
development session confirms the status quo is not an option and that
there are no plans to reinstate the second wholetime appliance at Hamilton
fire station should Options 1 or 2 not be supported. Notwithstanding
concerns regarding the sufficiency of provision outside dayshift, of the two
options, Option 2 is the council’s preferred resourcing option, which
reinstates the second appliance at Hamilton fire station, provides an
additional second appliance at Bellshill fire station, and enhances dayshift
resilience. 
If there is no reconsideration of proposed options the council seeks
reassurance that, subject to a final decision by the SFRS Board, Option 2 is
a permanent change under this review and not until such times as RAAC
works to the Cumbernauld fire station completes. 
The council would welcome clarity on anticipated timescales to fully
implement the proposed appliance and staffing changes in Lanarkshire
(subject to SFRS Board approval). 
62

Page 63

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject:   Land and Property Transfers and Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Executive Committee of the actions required in respect of land and
property transactions
1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the land detailed in Appendix A, which will be the subject of negotiated
transactions, be declared surplus to Council requirements.
[1recs]
3. Background
3.1. Details of land and property, which is potentially suitable for redevelopment or
disposal, are circulated to all Resources and Community Planning Partners to
establish if they are suitable for alternative operational use. 
3.2. Recommendations are made following the consideration of planning, title and other
legal constraints.  Any assets with competing interests are judged against Council
priorities, including the need for capital receipts, prior to a recommendation being
made. 
3.3. Transactions outwith the Property Bulletin process, where there is a requirement to
reallocate or declare property surplus as part of minor/adjoining sales, or to facilitate
a Council project, are not circulated through the Property Bulletin, however the
details are included in this report. 
3.4. Transactions are only included in the report after successful consultation with the
holding Resource(s) and Planning. 
4. Non Bulletin Disposals
4.1. Appendix A details negotiated transactions where the land requires to be declared
surplus in order that Property Services can conclude negotiations for its disposal.
9
63

Page 64

4.2 The land at Redwood Drive, East Kilbride, extending to 997 sq m or thereby, as
shown delineated on the attached plan, is owned by the Council and is the subject of
an approach by Network Rail. A separate agreement is in place between Network
Rail and a third party whereby Network Rail require to provide access to a proposed
development site.  To facilitate this agreement, it is necessary for Network Rail to
acquire the Council owned land as there is no scope for access to be taken from an
alternative location. 
5.  Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Capital receipts for both General Services and Housing Revenue Accounts will be
secured through the disposals identified in this report. 
6.2 The proposed agreement to sell the land is the subject of a valuation report to be
provided by the Valuation Office Agency (VOA) and the terms of any agreement will
be subject to approval by either the Housing and Technical Resources Committee
or, if appropriate, delegated authority. 
7. Other Implications
7.1. There is a low risk that the capital receipts anticipated, as a result of declaring these
properties surplus, may not be realised if, for reasons outwith the Council’s control,
the purchasers choose not to proceed with the transactions.  However, the
procedures and consultations described in Sections 3 and 9 of this report have been
implemented to minimise this risk. 
7.2. There are no significant issues in terms of sustainability arising from this report. 
8. integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. Consultation was undertaken with all Resources through the Property Bulletin.  In
addition, Planning, Roads, Legal, and Housing Services were consulted through the
Area Property Groups. 
Sharon Egan
Interim Executive Director (Housing and Technical Resources) 
30 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent  
List of Background Papers
 Plans of the land and property referred to in this report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- Gerry McParland, Property Services Manager (Assets and Estates)
Ext: 5177  (Tel: 01698 455177)
E-mail:  gerry.mcparland@southlanarkshire.gov.uk
64

Page 65

APPENDIX A - 
NON BULLETIN DISPOSALS 
Area  Description Holding
Account
Proposal Value
Band
997 sq m Land at Redwood Drive, East
Kilbride
Community
and
Enterprise
Sale to Network
Rail for inclusion
in proposed 3rd
party adjoining
development site 
Subject
to District
Valuer’s
report
88 sq m 25 Kronburg Way, East Kilbride Community
and
Enterprise
Garden Ground 4
23 sq m 2 Forrest Road, Lanark Housing Garden Ground 4
15 sq m 75 Deveron Crescent, Hamilton Housing Garden
Ground/Possible
Extension
4
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
65

Page 66

66

Page 67

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Interim Executive Director (Housing and Technical
Resources)  
Subject: South Lanarkshire Local Housing Strategy Annual
Review 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
 provide an update on the progress made during 2024/2025 against the agreed
outcomes set out in the Local Housing Strategy (LHS) 2022 to 2027   
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the progress on actions for delivering the agreed Local Housing Strategy
(LHS) priority outcomes across the five chapters be noted. 
3. Background
3.1. The Housing (Scotland) Act 2001 requires local authorities to carry out an
assessment of needs and demand for housing and related services, and to prepare
and submit a five-year LHS to Scottish Ministers. The LHS is the main plan for all
housing tenures in the local authority area. 
3.2. The LHS was developed during 2022, building on the good work undertaken by the
Council and its partners under the LHS 2017 to 2022. The LHS works alongside the
Council’s Local Development Plan 2 (LDP2), to set the strategic framework for local
housing development and aligns with corporate and community planning objectives. 
3.3. The Executive Committee approved the LHS on 30 November 2022 and noted the
annual monitoring and reporting arrangements.  This is the second annual review of
the LHS 2022 to 2027, with the first presented to Executive Committee on 26 June
2024. 
4. Mid-point Review of Local Housing Strategy 2022 to 2027
4.1. The delivery of the LHS 2022 to 2027 reached its mid-point in 2025 and, to support
the regular annual review process for 2024/2025, a mid-point review of the strategy
was also undertaken focusing on: 
 a review of existing and emerging priorities to ensure that they are properly
reflected in the strategy
 a review of existing actions and measures to ensure their continued relevance
to the strategy  
10
67

Page 68

 a review of timescales set out in the strategy to identify the need for any
revisions
 identifying any new actions or measures that are required to reflect the
changing context and priorities 
4.2. This mid-point review identified a number of revisions to the LHS 2022 to 2027 (as
detailed in section 7) which were considered by the LHS Steering Group throughout
2024/2025.  
5. Context and Wider Policy Changes
5.1. A number of significant changes in policy context have taken place both locally and
nationally since the first annual review of the LHS was presented in June 2024.   A
summary of these is set out below: 
 South Lanarkshire Council declared a Housing Emergency on 12 June 2024 in
response to a significant and sustained increase in demand for homelessness
services.  This continues to impact on the delivery of the Local Housing Strategy
2022 to 2027 and a new Homelessness Strategic Plan has been approved to
tackle the ongoing pressures.  The Homelessness Strategic Plan replaced the
Rapid Rehousing Transition Plan (RRTP). 
 South Lanarkshire Council became one of three local authorities in Scotland to
join the Marmot Place pilot, which aims to reduce health inequalities.  The pilot is
a partnership between the Council, Public Health Scotland (PHS) and University
College London’s Institute of Health Equity (IHE) and aims to prioritise actions to
improve the conditions in which people are born, grow, live, work, and age to
improve health and reduce health inequalities. 
 The Scottish Government announced a 22% reduction in the national Affordable
Housing Supply Programme budget for 2024/2025, impacting the Council’s ability
to deliver new homes within its current programme and increasing uncertainty
around future years budgets.  This cut was reversed for 2025/2026 when the
Scottish Government announced a 26% increase in funding on 2024/2025 levels. 
The Housing (Scotland) Bill 2024 continues to progress through the Scottish
Parliament, with Stage 2 considerations being completed on 3 June 2025.  The
Bill outlines proposals as part of the delivery of ‘New Deal for Tenants’ and some
aspects of ‘Housing to 2040’ including private sector rent controls, duties to
prevent homelessness, and considerations around domestic abuse.  
 The Scottish Government continues to progress the development of the Scottish
Housing Net Zero Standard, which will replace the second Energy Efficiency
Standard for Social Housing (EESSH2).  The new standard is expected to be
published during 2025/2026. 
 South Lanarkshire Council has developed Town Centre masterplans for Hamilton
and East Kilbride, in consultation with local communities, that will deliver
transformational change, including the creation of new homes that will see more
people live in town centres.  
68

Page 69

5.2. Housing and Technical Resources will continue to monitor national and local
developments in all areas and ensure that significant changes are appropriately
reflected within the LHS and associated plans or reports.
6. Annual Review 2024/2025
6.1. The LHS is structured around five chapters and eight priority outcomes. There are
106 indicators against which the Council monitors progress including 71 actions and
35 measures. In line with wider reporting arrangements across the Council, these
indicators can be categorised into ‘green’, ‘amber’ and ‘red’ depending on the
progress made against them.  Actions can also be recorded as ‘completed’ where
appropriate, or ‘to be reported later’ if they are planned for delivery in a future year of
the strategy.
6.2. As at the end of 2024/2025, 77% of the indicators were in line with projected targets
or have been completed, up from 60% in 2023/2024. Table 1 outlines the 2024/2025
categorisation of the 106 indicators.
Blue Green Amber Red To be
reported later Total
2 80 10 1 13 106
Table 1: Categorisation of LHS indicators 2024/25 
6.3. The review demonstrated good progress has been made for 80 indicators and two
further actions have been completed in full.  At the mid-point of the LHS, 13
indicators are ‘to be reported later’ due to scheduled delivery in future years of the
strategy.  Key highlights within each of the five chapters have been provided below: 
Chapter 1: Housing Supply, Affordability, and Choice
 To improve the availability of affordable housing in South Lanarkshire, a total of
503 additional Council homes for social rent have been provided during the
duration of the strategy to March 2025. This included 154 new build properties
and 349 acquired through the Council’s Market Purchase Scheme.  A further
305 new build homes also completed by Registered Social Landlords (RSL)
across South Lanarkshire in priority areas.
 Through working with owners of long-term empty homes and partner services,
28 long-term empty homes were successfully supported back into use by the
Council during the year, exceeding the annual target of 15. This brings the total
of empty homes brought back into use since the strategy began to 63.
 Through the implementation of the Progressive Housing Framework, 21
households were supported to remain in their own home through the provision
of equipment and/or adaptations, and 465 households moved to properties
which met their assessed needs.  Additionally, through the Strategic Housing
Investment Plan 2025 to 2030, approved in November 2024, the Council is
working  to optimise the opportunities available to meet particular needs on a
site-by-site basis. 
69

Page 70

Chapter 2: Housing Quality, Energy Efficiency and Decarbonisation
 The Council engaged with over 4,000 households during 2024/2025 to promote
the availability of energy advice and funding support schemes to help minimise
fuel costs.  This includes 465 referrals to the Warmer Homes Scotland scheme
which resulted in the installation of 2,388 measures to improve the energy
efficiency of people’s homes.
 The Council continues to deliver the ‘Energy Company Obligation Scheme’
(ECO4) which allows national energy company funding to be used by locally
based contractors to make energy efficiency improvements to eligible homes at
no cost to the homeowner. During 2024/2025, 295 energy efficiency measures
were installed in 102 homes across South Lanarkshire, bringing the total since
the scheme was launched in 2023 to 627 measures across 229 homes.  The
types of energy efficiency measures installed include solar panels, boiler
upgrades, and insulation.
 The South Lanarkshire Local Heat and Energy Efficiency Strategy, a long-term
strategic framework for decarbonising heat in buildings and improving energy
efficiency, was approved by the Council’s Executive Committee in June 2024. 
The strategy aligns with the LHS and prioritises reducing heat demand,
transitioning to zero direct emissions heating systems, and making greater use
of heat networks. 
Chapter 3: Specialist Provision and Supporting Independent Living
 The Housing and Dementia Framework, published by the Chartered Institute of
Housing (Scotland) has been implemented across the sheltered housing
service.  This includes all staff undertaking dementia awareness training,
integrating dementia friendly design principles into sheltered housing
investment projects and upgrades, establishing strong links with dementia
support groups, and promoting the Herbert Protocol which provides key
information to help quickly and safely locate missing people with dementia.
 Of the 71 new affordable homes delivered by the Council and its Registered
Social Landlord partners during 2024/2025, eight wheelchair accessible homes
were included. This exceeds the 10% target for new build homes for social rent
that are wheelchair accessible.
 Throughout 2024/2025 the Council has continued to invest within the two South
Lanarkshire Gypsy/Traveller sites, with priorities for improvements agreed co-
developed with site residents.  Improvements at Shawlands Crescent include
the extension of amenity units, upgrades to metres, the installation of solar PV
and batteries, and the completion of a new playpark. At the Springbank Park
site, solar PV and batteries have also been installed, and construction began on
new playpark.
 A full review of the South Lanarkshire Scheme of Assistance, which provides
financial and practical support to private sector households for home repairs
and adaptations, was undertaken during 2024/2025 to ensure continued
alignment with statutory requirements and guidance.  Views were sought from a
range of customer groups during a 12-week consultation period and the revised
document was published on the Council’s website following approval by the
Housing and Technical Resources Committee in May 2025. 
70

Page 71

Chapter 4: Addressing Homelessness
 During 2024/2025 the number of homelessness applications received
decreased by 9.6% from a peak in 2023/2024.  At 2,467 applications received,
this year does however remain significantly above pre-pandemic norms of
approximately 2,000 applications in any year.  The Council’s active caseload
also remains persistently above previous trends (circa 1,000 households at any
one time) comprising 1,543 households at the end of 2024/2025.  
 During 2024/2025, 1,482 people accessed Housing Options services,
increasing 36% on the previous year.  Homelessness was prevented in 60% of
cases where people received Housing Options support.
 The percentage of homeless households maintaining their tenancy for more
than 12 months remains high at 91.3%.
Chapter 5 Sustainable Places
 To ensure an appropriate provision of affordable homes, Housing and
Technical Resources has contributed to the development of the East Kilbride
and Hamilton Town Centre Masterplans to ensure appropriate focus upon
meeting increasing housing need across both towns.
 Active travel links continue to be considered as part of new site designs across
the Affordable Housing Supply Programme, with on-street bicycle parking,
dropped kerbs and connecting pathways being implemented within sites to align
with the principles of the National Planning Framework.
 Capacity for charging 50 electric vehicles was provided at designated charging
points at the Brackenhill Farm development in Hamilton. 
6.4. There were ten indicators categorised as ‘amber’ within the review, with work
currently underway to ensure progress is made in 2025/2026. This includes plans to
develop a grant or loan scheme to support more empty homes being brought back
into use, and ongoing work to improve the access rates for the installation of smoke
and heat detectors and fixed electrical testing within Council homes. 
6.5 One measure was categorised as ‘red’, below anticipated performance: 
 M6.2 Level of Homeless Households (homelessness caseload at year end). 
South Lanarkshire continues to experience a Housing Emergency with sustained
demand for homelessness services, in line with trends across Scotland.  The new
Homelessness Strategic Plan 2024/2025 contributed to important progress during
the year, but the homelessness caseload at year end was 1,543 which is only slightly
lower than 2023/2024 and remains significantly higher than the LHS baseline. 
The Homelessness Strategic Plan 2024/2025 sets out five priority outcomes to help
reduce ongoing pressures on homelessness services: 
 prevent homelessness occurring wherever possible thus reducing its impact
 limit time spent by households in temporary accommodation and minimise
temporary accommodation moves before moving onto settled homes
 ensure housing support provision meets the level and type of need for
households to live independently within communities
 enhance integration and partnership working to embed RRTP through a whole
systems approach
 implement and monitor the Homeless Demand Pressures Mitigation 
71

Page 72

6.6 13 indicators were identified as ‘to be reported later’ in line with the timescale
identified for implementation.  Services continue to collate data for these and will
update the performance framework when available. 
7. Proposed Revisions to LHS Performance Framework
7.1. The annual review provides the opportunity to assess and report on the progress
made against each of the actions and measures contained within the LHS
performance framework. It also allows for a general re-examination of the LHS to
ensure that the objectives, actions, and measures identified, remain appropriate,
relevant, and measurable. 
7.2. To ensure the performance framework is up-to-date and continues to align with
linked strategies, plans, and guidance, minor updates will be made to LHS indicators
to reflect changes within linked documents which have been revised since the LHS
was published. 
7.3. The performance framework will also be updated to reflect move from the Rapid
Rehousing Transition Plan to the Homelessness Strategic Plan, approved by
Housing and Technical Resources Committee.  This will ensure that all
homelessness related actions and measures are consistent.  This will affect Actions
2.10 and 6.6. 
7.4. During the annual review, five proposed revised indicators have been noted below
with full details available in Appendix one: 
 revising Action 1.3 to reflect the establishment of a national Matchmaker
Scheme to bring empty homes back into use
 update the timescales for a Gypsy/Traveller Needs Assessment at Action 5.10
to 2026/2027
 revising Action 8.1 on rural housing action plans to reflect the growing interest
in community led housing projects in rural areas
 increasing the annual target for the number of empty homes supported back
into use (M.3.1) from 15 to 20
 revising the wording of measure M.2.1 to reflect that we will maintain rather
than increase the number of accredited landlord properties in response to
changes in the private rented sector, including a reducing trend in the number
of private rented tenancies 
7.5. In addition, two new actions are recommended for Outcome 8 which is focused on
sustainable communities. These link with the wider context and policy changes
referenced in section 5 of the report and include: 
A.8.9 – Ensure the provision of affordable housing as part of the corporate Town
Centre Action Plans 
A.8.10 – Contribute to actions to reduce health inequalities in South Lanarkshire
through the Marmot Place pilot. 
7.6. Following approval, all revisions and additions will be incorporated into the LHS
performance framework for 2025/2026.  
72

Page 73

8. Looking Ahead
8.1 2025/2026 will be the third full year of the Local Housing Strategy 2022 to 2027 and,
in addition to the indicators being progressed within the strategy, the Council and its
partners will continue to take forward a wide range of other work, including: 
 monitoring the progress through the Scottish Parliament of the Housing
(Scotland) Bill 2024, which includes provisions around homelessness
prevention and the private rented sector, submitting responses to consultations
and evidence to parliamentary committees where requested
 monitoring the outcome of the Scottish Government consultations on proposals
for the Heat in Buildings Bill and the Social Housing Net Zero Standard which
will replace EESSH2
 continuing to contribute to the Marmot Place pilot to embed the role of high
quality affordable housing in tackling health inequalities in South Lanarkshire
 continuing to contribute to the development of the Council’s Evidence Report as
part of the preparation for the Local Development Plan 4
 continuing to contribute to the delivery of the Health and Social Care
Partnership’s Strategic Commissioning Plan 2025 to 2028 in line with the
Housing Contribution Statement 
8.2 Progress in these areas will continue to be monitored with a further update provided
as part of the next Annual Review in 2026. 
9. Next Steps
9.1 The review identified that the Council and its housing, health and homelessness
partners have made good progress in 2024/2025 towards delivering on the eight
priority outcomes.
9.2 The finalised review document will be shared with the Scottish Government and the
Local Housing Strategy Steering Group.
9.3 The Council will continue to monitor, influence where possible and enact any
national policy changes that relate to the Local Housing Strategy 2022 to 2027.
10. Employee Implications
10.1 There are no implications for employees arising from the information presented in
this report. 
11. Financial Implications
11.1 There are no financial implications arising from the information presented in this
report. 
12. Climate Change, Sustainability and Environmental Implications
12.1. There are no climate change or environmental implications as a result of this report. 
12.2. The action in the LHS continue to link closely with the Climate Change and
Sustainability Strategy and a full Strategic Environmental Assessment (SEA) was
completed as part of the development of the LHS 2022 to 2027, with feedback from
statutory authorities incorporated into the strategy.  
73

Page 74

12.3. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024/2025. 
13. Other Implications
13.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
13.2. A full Strategic Environmental Assessment (SEA) was completed as part of the
development of the LHS 2022 to 2027 with feedback from statutory consultation
authorities incorporated into the strategy.
14. Integrated Impact Assessment and Consultation Requirements
14.1. An Equality Impact Assessment and Fairer Scotland Duty Assessment were
completed as part of the development of the LHS 2022 to 2027, identifying the
relevance to individuals covered under the “protected characteristics” as defined in
the Equality Act 2010 and the positive impact it could achieve for communities
across South Lanarkshire. 
14.2. The LHS is subject to ongoing consultation and engagement with key partners and
stakeholders through the Local Housing Strategy Steering Group and ongoing links
with tenants and other stakeholders. 
Sharon Egan
Interim Executive Director (Housing and Technical Resources) 
6 August 2025 
Link(s) to Council Values/Priorities/Outcomes
Values
Focused on people and their needs
Working with and respecting others
Accountable, effective, efficient and transparent
Ambitious, self-aware and improving
Fair, open and sustainable 
Priorities
We will work to put people first and reduce inequality
We will work towards a sustainable future in sustainable places
We will work to recover, progress and improve 
Outcomes
Our children and young people thrive
Good quality, suitable and sustainable places to live
Thriving business, fair jobs and vibrant town centres
Caring, connected, sustainable communities
People live the healthiest lives possible 
74

Page 75

Previous References
 Executive Committee Report, ‘Local Housing Strategy 2022-27’, 30 November 2022
 Executive Committee Report, ‘Local Housing Strategy (LHS) Annual Review 2023-24’,
26 June 2024
 South Lanarkshire Council Report, ‘Notice of Motion – Declaration of a Housing
Emergency’, 12 June 2024
 Housing and Technical Resources Committee Report, ‘Review of South Lanarkshire
Council’s ‘Scheme of Assistance’’, 14 May 2025 
List of Background Papers
 Local Housing Strategy 2022 to 2027
 South Lanarkshire Homelessness Strategic Plan
 South Lanarkshire Strategic Commissioning Plan 2025 to 2028
 South Lanarkshire Local Heat and Energy Efficiency Strategy 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Claire Frew, Strategy Co-ordinator 
E-mail: claire.frew@southlanarkshire.gov.uk 
75

Page 76

Appendix 1: Proposed revisions to LHS Performance Framework 
Ref. Current
action/measure
Status Ref. Proposed replacement action/measure
(where appropriate)
A.1.
3
Establish a
Matchmaker
Scheme to link long-
term empty
properties and their
owners with
interested buyers.
Amber A.1.
3
A national Matchmaker Scheme is being
developed by the Scottish Empty Homes
Partnership. 
Proposed revised action – Monitor the
delivery of the national Matchmaker
Scheme and ensure opportunities to
implement in South Lanarkshire are
progressed. 
A.5.
10
Work with
stakeholders and
community members
to deliver an
accommodation
need and demand
assessment for
Gypsy/Travellers
Green A.5.
10
To align with national work streams and
ensure action is completed effectively,
Timescale for completion to be revised to
2026/27.
A.8.
1
Work with rural
communities to
review rural housing
action plans every
two years
Green A.8.
1
Update action to reflect growing interest in
community led housing projects across
rural areas 
Proposed revised action – 
Work with rural communities to review
rural housing action plans, including
opportunities for Community Led Housing,
every two years
M.1.
3
The number of long
term empty
properties supported
to be brought back
into use by the
council
Green M.1.
3
Following strong performance in the
number of empty homes brought back into
use since commencement of the strategy,
it is proposed to increase annual target
from 15 to 20 in 2025/26. 
M.2.
1
Increase the number
of accredited
landlord properties
Amber M.2.
1
In response to changes in private rented
sector, including a reducing trend in the
number of private rented tenancies.
proposed to amend measure from
increase to maintain      
76

Page 77

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: South Lanarkshire Council Response to Pre-budget
Scrutiny Call for Views on Responding to Long-Term
Fiscal Pressures 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Council’s response to the call for views issued by the Finance and
Public Administration Committee of the Scottish Parliament as part of the pre-
budget scrutiny process
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[]
(1) that the South Lanarkshire response to the call for views, attached at
Appendix 1, be noted. 
3. Background
3.1. In recent years, in line with the recommendations of the Budget Process Review
Group report, Scottish Parliament subject committees have undertaken pre-budget
scrutiny, in advance of the publication of the Scottish budget. 
3.2. The intention is that committees will use pre-budget reports to influence the
formulation of spending proposals while they are still in development. In order to
facilitate this, committees are required to publish pre-budget reports at least six
weeks prior to the Scottish budget. The requirement to engage early in the budget
process with local government is reflected in the developing Fiscal Framework
element of the New Deal for Local Government jointly agreed between the Scottish
Government and COSLA. 
3.3. As part of its pre-budget scrutiny, the Finance and Public Administration Committee
of the Scottish Parliament issued a call for evidence on 17 June to inform its enquiry,
which this year is on the topic of Responding to Long-Term Fiscal Pressures. 
3.4. The deadline for submission was 11 August 2025 and this report presents the
Council’s input to this call for views for noting.  
11
77

Page 78

4. The Pre-budget Scrutiny Call for Views
4.1. The focus of the Finance and Public Administration Committee’s pre-budget scrutiny
is the following areas: 
 steps the Scottish Government is taking in response to fiscal pressures arising
from population trends highlighted in the Scottish Fiscal Commission’s latest
Fiscal Sustainability Report
 the Scottish Government’s approach to increasing productivity and economic
activity
 steps the Scottish Government is taking to support growth sectors in Scotland
with a view to increasing economic performance and tax revenues
 key financial documents to be published by the Scottish Government during this
year’s pre-budget scrutiny period, including its:
- Medium-Term Financial Strategy (MTFS)
- Fiscal Sustainability Delivery Plan (FSDP)
4.2. The Finance and Public Administration Committee will assess whether these
demonstrate improved medium and longer-term financial planning by the
Government:- 
 information in the MTFS on the fiscal sustainability of social security spending,
including analysis of how the Scottish Government is assessing:
- the effectiveness and outcomes of its approach to the delivery of benefits
- its impact on other parts of the Budget
 the Scottish Government’s Public Service Reform (PSR) Strategy and
Infrastructure Investment Plan pipeline refresh
4.3. To help inform its enquiry, the Committee has asked for views on the following
questions: 
1. What actions should the Scottish Government be taking now to start to address
these ‘Scottish specific fiscal sustainability challenges’? 
2. To what extent does the Scottish Government’s 2025 MTFS and its FSDP
demonstrate effective medium- and longer-term financial planning? Can any
improvements be made in future years? 
3. How adequately does the MTFS and the FSDP address the Scottish-specific
fiscal sustainability challenges? 
4. To what extent does the 2025 framework document for the Scottish Spending
Review meet the BPRG’s recommendations on content and timescales? 
5. What should the next Scottish Spending Review prioritise? 
6. Faced with an ageing population, what actions should the Scottish Government
take to increase labour market participation, with a view to growing the tax base? 
7. Given the stagnation experienced in Scotland and the UK since the 2007/08
financial crisis, what lessons can be learned from countries that have
experienced recent productivity growth?    
78

Page 79

8. In which areas should the Scottish Government prioritise its capital spend to best
support economic growth?  
9. To what extent does the Scottish Government’s PSR Strategy demonstrate the
vision and leadership required to drive progress? How well does it enable
progress to be tracked, and outcomes measured?  
10. How transparent and ‘joined up’ are the Scottish Government’s key strategic
financial planning documents? What improvements in this area can be made? 
4.4. Within the Council’s response, attached at Appendix 1, the Executive Committee is
asked to note the following key points: 
 The MTFS’s central scenario for growth in funding significantly lags behind
projected growth in Scotland’s assessed spending needs. By 2029/2030, a
‘funding gap’ of £2.6 billion a year for day-to-day (non-investment) spending is
projected.  Whole system discussions are required now in advance of
identifying administrative savings, reducing the size of the public sector
workforce, re-prioritisation of spending, and a focus on boosting tax revenues
in order to meet the funding gap anticipated. 
 The MTFS assumes that Local Government will experience the same funding
pressures as the rest of the public sector, however this fails to take account of
the changing legislative and policy landscape which has seen demands on
councils increase with, in many cases, no additional funding.  In light of the
considerable changes which may need to be implemented, e.g., in the health
and social care field, it would be appropriate for some recognition of the
potential for additional costs to fall to Local Government. 
 From the Fiscal Sustainability Report and the MTFS, it is clear that priority
needs to be given to preventative spend to stem the costs arising from an
ageing population and continuing trends in chronic ill-health.  Within this it
should be recognised that Local Government services are an essential part of
such an approach, from home care and supports for independent living to
broader measures to help communities access healthy choices and options to
enhance wellbeing at all ages.  Local Government services – like housing,
education, childcare, employability, and leisure and culture – play a significant
role in preventing poor health outcomes and reducing demand for healthcare
services, as well as supporting people into employment and helping to reduce
dependence on the welfare system.  These are the reasons that prompted the
Council’s participation in the Marmot Initiative. 
 While there is a need to prioritise upstream investment, this must be through
sustainable reform, and not at the expense of core Local Government funding. 
In this context we note the ambitions to take forward actions in Health and
Social Care service reform, Social Security benefits, Justice reform, Education
and Skills reform and joined up models of service delivery for those most in
need.  We believe that these reforms need to be developed within the context
of a whole-system approach which does not reduce core funding for one area
of the public sector to make way for reform in another.  
79

Page 80

 The role of Local Government in driving economic transformation and
improvement is significant. Councils are major employers in themselves and
also play a key role in terms of local economies, commissioning and procuring
services, creating jobs and providing employability services to support people
into work.  We welcome the forthcoming legislation on Community Wealth
Building which will harness the energies of bodies across the public sector to
help boost local economies.  We believe that Local Government can be key
enablers of fairer, greener, stronger local economies, which in turn will boost
productivity and reduce demand for social security and other forms of public
support. By growing local economies and creating jobs, reliance on public
services can be reduced, with significant health and wellbeing benefits, as
people are empowered by work.  Councils and local partners are well placed to
deliver improved outcomes at the local level and are in a unique position to
represent, engage with and empower local communities in the design and
delivery of services. 
 As with previous spending review documents and PSR approaches, the PSR
Strategy places considerable reliance on efficiencies.  However, there is a risk
of overestimating the efficiencies that can still be made. For more than a
decade, Local Government has been responding to funding pressures, making
efficiency savings and cutting services impacting on service delivery – this
cannot go on indefinitely.  The challenge, which grows ever more acute, is to
generate savings through further efficiencies without impacting further on
service delivery.  Efficiencies can be focused as much on improving services
as achieving savings and doing better services may not necessarily save
money. There needs to be a far greater focus on taking demand out of the
system – demand which currently necessitates costly services to respond to
the symptoms rather than the cause.  There also needs to be fair sustainable
funding for Local Government.  However, demand reduction requires a shift in
focus, and it requires capital investment.  The ability to deliver more efficient
services which could, in turn, deliver savings also depends very much on Local
Government’s ability to invest in capital infrastructure. 
 From a local government perspective, the transparency and coherence of the
Scottish Government’s strategic financial planning documents needs to be
matched by – and not undermined or contradicted by – ad-hoc funding
announcements and unilateral policy initiatives. In particular, the Scottish
Government cannot keep adding to policy commitments without sustainable
funding being available. In the recent past there have been multiple policy
funding announcements which Local Government is required to deliver in
addition to its existing statutory and core services. 
4.5. As noted above, the Parliamentary Committee has issued its call for views as part of
the normal pre-budget scrutiny process.  The Committee will hear oral evidence in
September/October 2025 and will publish its report in early November. 
5. Next steps
5.1. The Executive Committee is asked to note the submission at Appendix 1. 
6. Employee Implications
6.1. None.  
80

Page 81

7. Financial Implications
7.1. There are potentially significant financial implications for the Council arising from
decisions taken in relation to the Scottish Budget 2026/2027.  The response
prepared by the Council underlines and scale and significance of the financial
challenges facing local government. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change, sustainability and natural environment
implications arising from this report. 
9. Other Implications
9.1. Considering the detail of the report and identifying actions as appropriate contribute
towards effective risk management. There are very significant risks to local
government arising from the decisions taken in the Scottish Budget 2026/2027. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. Consultation was undertaken internally on the contents of this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
5 August 2025 
Link(s) to Council Objectives/Priorities/Outcomes
• Accountable, effective, efficient and transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637  (Tel:  01698 455637)
E-mail:  Lorraine.O'Hagan@southlanarkshire.gov.uk 
81

Page 82

Appendix 1 
1. What actions should
the Scottish Government
be taking now to start to
address these ‘Scottish
specific fiscal
sustainability
challenges’? 
The MTFS’s central scenario for growth in funding
significantly lags behind projected growth in Scotland’s
assessed spending needs. By 2029/2030, a ‘funding gap’ of
£2.6 billion a year for day-to-day (non-investment) spending is
projected. 
Whole system discussions are required now in advance of
identifying administrative savings, reducing the size of the
public sector workforce, re-prioritisation of spending, and a
focus on boosting tax revenues to meet the funding gap
anticipated. 
2. To what extent does
the Scottish
Government’s 2025
MTFS and its FSDP
demonstrate effective
medium- and longer-term
financial planning? Can
any improvements be
made in future years? 
The MTFS sets out projections for the Scottish Government’s
funding and spending requirements, providing central, higher
and lower scenarios to illustrate the uncertainty around these. 
The MTFS’s higher and lower scenarios underline just how
uncertain Scotland’s fiscal outlook remains. Any multi-year
Scottish Spending Review published later this year will almost
certainly need revisiting as UK funding plans evolve, tax and
benefit forecasts are updated, and the lessons from
implementing the FSDP become clear.   
The MTFS makes clear current forecasts for the contribution
of devolved tax revenues to the Scottish Budget are likely to
be optimistic.  This could lead to a larger funding gap that
would need to be addressed. 
3. How adequately does
the MTFS and the FSDP
address the Scottish-
specific fiscal
sustainability challenges?  
The Scottish-specific fiscal sustainability challenges are
(essentially): 
On health:
• Ageing population (earlier or “faster” than UK as a whole).
• Scotland has specific health challenges, with poorer
health, lower life expectancy, poorer mental health – all
drive greater needs and greater public expenditure.
• Productivity in health delivery has declined since the
pandemic, so for the future there is a bigger problem but a
trend of lower outputs.
• Health spending is the lion’s share of the Scottish Budget
at 36%.
• Recent trends (since about 2010) project a scenario of
increasing ill-health and spiralling costs.
• Spending on health is the greatest driver of increased
public expenditure.
On productivity:
• Scotland’s labour market participation rates are lower than
the UK and will continue to be so due to lower population
growth and projected ageing of the population.
82

Page 83

• Productivity will be lower than in the UK due to a lower
growth in the 16+ population than UK as a whole
Other:
• Costs which may arise from climate change or the drive to
achieve net zero have not been factored in and in either
case would likely present additional fiscal challenges.
• If the UK government responds to UK fiscal pressures,
then this would have a knock-on effect on SG Government
funding via block grant and would reduce the money
available, thereby greatly increasing the budget gap.
• The fiscal sustainability report suggests that devolved
public spending will have to be reduced by 1.2% each
year, compared with projected spend, to balance the
books.
There needs to be whole system thinking about health and
wellbeing across the public sector, with greater investment
upstream to reduce demand rather than just increasing
funding for the NHS – prevention is key. The main social
determinants of health (education, housing, employment) are
all long-term drivers which must be invested in to improve
health outcomes and address health inequality. We welcome
the recognition of this in the MTFS however the fundamental
question is how this is delivered in practice.  As we argue
elsewhere in this submission, the severe funding pressures
experienced by councils are impacting on multiple services
which support, directly and indirectly, health, wellbeing, and
local economies. 
The Scottish Fiscal Commission notes that “Although better
population health would improve the fiscal position, the scale
of the UK fiscal challenges mean improvements in the
populations health would not be enough by themselves to
solve the fiscal sustainability challenges” (Fiscal Sustainability
Report para 36).  This means that preventing ill-health can
only be part of the solution.  Measures to redesign public
service delivery and to boost productivity and tax revenue
must be given high priority. 
After spending on health and education, the biggest area of
expenditure for the Scottish Government is on social security. 
The MTFS states that Scottish Government support for a
range of Scotland-specific Social Security measures
represent an investment in the people of Scotland (para
3.2.4), and that the continuation of this support will inevitably
have implications for the resources available elsewhere in the
public sector.  We would reiterate a point we have made
before (through COSLA and SOLACE) that while social
security has a significant role to play in supporting hard-
pressed households and vulnerable people, there needs to be
whole system discussions across the public sector to identify
ways of supporting people and families on low income, as
well as how to tackle economic inactivity and low participation
83

Page 84

rates.  These are the issues that prompted the Council’s
participation in the Marmot Initiative. 
The MTFS assumes that Local Government will experience
the same funding pressures as the rest of the public sector
(para 3.2.5), however this fails to take account of the
changing legislative and policy landscape which has seen
demands on councils increase with, in many cases, no
additional funding.  In light of the considerable changes which
may need to be implemented, e.g., in the health and social
care field, it would be appropriate for some recognition of the
potential for additional costs to fall to Local Government. 
Councils are having to rationalise demands when money is
tight.  Fully funded joined-up policies which prioritise
prevention are required, and not just simply continuing to
shore up systems which need to change. 
4. To what extent does
the 2025 framework
document for the Scottish
Spending Review meet
the BPRG’s
recommendations on
content and timescales? 
The budget process, as recommended by the Budget
Process Review Group (BPRG), is centred around four core
objectives: 
• to have greater influence on the formulation of the Scottish
Government’s budget proposals,
• to improve transparency and raise public understanding
and awareness of the budget,
• to respond effectively to new fiscal and wider policy
challenges, and 
• to lead to better outputs and outcomes, as measured
against benchmarks and stated objectives.
The Council welcomes the Scottish Government’s
engagement on the budget process and the commitment to
continue to progress the positive work achieved to date. 
Improved transparency and engagement on the budget
process are welcomed with acknowledgment from the
Scottish Government of the continued financial challenges
facing the Council. 
A multi-year approach to financial planning will help the
parliamentary committees as well as local government, by
giving them a degree of certainty in relation to their funding,
and the ability to plan strategically in relation to their policy
intent. 
It is appropriate to reiterate the point that it is impossible to
deliver outcomes without greater funding.  Councils are
having to prioritise demand when money is tight.  Fully funded
joined-up policies which prioritise prevention are required,
and not simply continuing to shore up systems which are in
need of change. 
84

Page 85

5. What should the next
Scottish Spending
Review prioritise?
From the Fiscal Sustainability Report and the MTFS, it is
clear that priority needs to be given to preventative spend to
stem the costs arising from an ageing population and
continuing trends in chronic ill-health.  Programmes and
services which boost economic participation rates should be
given consideration. 
Within this it should be recognised that Local Government
services are an essential part of such an approach, from
home care and supports for independent living to broader
measures to help communities access healthy choices and
options to enhance wellbeing at all ages. 
Local Government services – like housing, education,
childcare, employability, and leisure and culture – play a
significant role in preventing poor health outcomes and
reducing demand for healthcare services, as well as
supporting people into employment and helping to reduce
dependence on the welfare system.  While there is a need to
prioritise upstream investment, this must be through
sustainable reform, and not at the expense of core Local
Government funding.  In this context we note the ambitions to
take forward actions in Health and Social Care service
reform, Social Security benefits, Justice reform, Education
and Skills reform and joined up models of service delivery for
those most in need.  We believe that these reforms need to
be developed within the context of a whole-system approach
which does not reduce core funding for one area of the public
sector to make way for reform in another. 
Prioritising prevention means giving due attention to people
and places – focusing on the communities in which children
grow up, in which local action can be taken on climate
change, and in which businesses can thrive.  Without a focus
on creating vibrant and supportive communities, our public
services will continue to plough money into addressing
complex and resource-intensive problems that mean poorer
outcomes for individuals. Put simply, resource spending that
is focused on supporting people to live well locally is cost-
effective and aligns with the principles underpinning the
MTFS. 
6. Faced with an ageing
population, what actions
should the Scottish
Government take to
increase labour market
participation, with a view
to growing the tax base?
We believe it is important to Invest in people to support the
economy.  There should be an equal focus on growing local
economies and creating jobs, so that reliance on public
services can be reduced and additional tax revenue can be
raised. This also creates significant health and wellbeing
benefits, as people are empowered by work and enabled to
live well locally. 
The role of Local Government in driving economic
transformation and improvement is significant. Councils are
major employers in themselves and also play a key role in
terms of local economies, commissioning and procuring
services, creating jobs and providing employability services to
85

Page 86

support people into work.  We welcome the forthcoming
legislation on Community Wealth Building which will harness
the energies of bodies across the public sector to help boost
local economies. 
We believe that Local Government can be key enablers of
fairer, greener, stronger local economies, which in turn will
boost productivity and reduce demand for social security and
other forms of public support. By growing local economies
and creating jobs, reliance on public services can be reduced,
with significant health and wellbeing benefits, as people are
empowered by work.  Councils and local partners are well
placed to deliver improved outcomes at the local level and are
in a unique position to represent, engage with and empower
local communities in the design and delivery of services. 
Services delivered by councils which are directly relevant to
increasing labour market participation include: 
• Early Learning and Childcare
• Education (Primary, Secondary, Special) and Additional
Support for Learning
• Fair Work
• Economic Development and Business Support (including
Business Gateway)
• Employability Support
• Employability Partnerships
• Delivery of No One Left Behind
• Youth unemployment support, including apprenticeships,
job creation schemes
• Supported Employment
• Tourism Support
7. Given the stagnation
experienced in Scotland
and the UK since the
2007/08 financial crisis,
what lessons can be
learned from countries
that have experienced
recent productivity
growth?
There are several areas of activity where countries have
invested and seen economic growth: 
• Innovation and Research & Development
- Public and private investment in R&D
- University and industry collaboration
- Enhanced support for startups and growing companies. 
Lesson – Increased R&D investment.  An example of this is
where the Council, Clyde Gateway URC and Scottish
Enterprise are seeking to deliver ‘Red Tree Labs’ – a high
specification laboratory, office and incubator space.   
• Infrastructure Investment
- Continued investment in infrastructure. 
• Policy
- Delivery and commitment to long-term economic
strategies that cross political cycles.  
86

Page 87

• Training / Upskilling
- Vocational education and training that aligns closely with
industry needs.
- Lifelong learning initiatives to upskill works in response to
technological change.   
Lesson – would be for Scotland to strengthen links between
education, training and industry particularly in digital and
green sectors.   
• Digital Transformation
- Digital infrastructure investment
- Digital public services and e-governance
- SME digital adoption and champions 
Lesson – would be to accelerate digital infrastructure and
adoption.  Particular issue for rural areas and SMEs.   
8. In which areas should
the Scottish Government
prioritise its capital spend
to best support economic
growth?
• Digital Infrastructure to improve productivity 
• Research & Development Hubs.  Create also innovative
hubs and tech incubators.
• Industrial/Commercial Development – Ryden report
commissioned by South Lanarkshire Council identified the
lack of supply of industrial space with certain locations
also experiencing industrial property becoming obsolete. 
The findings of this study also echo a similar study across
Glasgow City Region. 
• Green Infrastructure and Net Zero Transition
- This would support long-term sustainability, job creation
and resilience. Examples could be hydrogen projects and
energy efficiency in public building and homes.
• Transport and Connectivity including rail and bus
infrastructure and the Glasgow Metro project.  Investment
in transport projects for the rural areas. 
• Affordable and Sustainable Housing which would support
the construction sector.  Support for social and affordable
housing to address the housing crisis.  Retrofit of homes
for energy efficiency.
• Education and Skills investment including training and
learning initiatives as well as capital investment in
establishments.   
9. To what extent does
the Scottish
Government’s PSR
Strategy demonstrate the
vision and leadership
required to drive
progress? How well does
it enable progress to be
As with previous spending review documents and PSR
approaches, the PSR Strategy places considerable reliance
on efficiencies.  However, there is a risk of overestimating the
efficiencies that can still be made. For more than a decade,
Local Government has been responding to funding pressures,
making efficiency savings and cutting services impacting on
service delivery –  this cannot go on indefinitely.  The
challenge, which grows ever more acute, is to generate
87

Page 88

tracked, and outcomes
measured?
savings through further efficiencies without impacting further
on service delivery. 
Efficiencies can be focused as much on improving services
as achieving savings and doing better services may not
necessarily save money. There needs to be a far greater
focus on taking demand out of the system – demand which
currently necessitates costly services to respond to the
symptoms rather than the cause. There also needs to be fair
sustainable funding for local government.  However, demand
reduction requires a shift in focus, and it requires capital
investment. The ability to deliver more efficient services which
could, in turn, deliver savings also depends very much on
Local Government’s ability to invest in infrastructure.  For
instance, to improve the energy efficiency of vehicle fleets
needs capital investment in the infrastructure to support this.
Further efficiencies will impact on services and outcomes. 
The drive for efficiencies – and in particular the across-the-
board aim of reducing Public Service headcount – could
undermine efforts to attract, retain, and value the public
sector workforce.  The delivery of efficiencies needs to be
within a framework which allows recognition of and
investment in the workforce to demonstrate the value and
essential role that they play. If not, and further ‘efficiencies’
are sought from an already hard worked sector, we will see
increased levels of absence, of leavers and a continuing
reduction in applicants to fill the void. Additionally, there are a
number of statutory and policy commitments which prevent
any reduction in workforce numbers as it is not possible to
deliver services without sufficient staff to do so. 
The primary concern for Local Government is that individuals
and communities get the services they need at the right time
regardless of where they live and of their individual
circumstances. The Local Government workforce has played
a vital role serving their communities in extremely challenging
circumstances over the past few years, and supporting the
whole of this workforce as we face the challenges of the
future must be a key priority. For this reason, considerable
thought needs to be given to the planned reduction in the
public sector workforce. 
10. How transparent and
‘joined up’ are the
Scottish Government’s
key strategic financial
planning documents?
What improvements in
this area can be made?
We welcome the committee’s interest in gaining an overview
of the strategic plans in this space, with a view to co-
ordinating, aligning and potentially reducing complexity.  We
believe that, in the context of funding constraints across the
public sector, it is imperative to look at where policy demands
can be streamlined, consolidated and reduced. 
Over and above this, and in general, frank discussions are
needed across the public sector around what can and should
be delivered, and what needs to be deprioritised or changed
going forward. These conversations are by necessity
happening in councils across the country in response to
88

Page 89

widening budget gaps, and the debate needs to be had at a
national and strategic level. 
From a local government perspective, the transparency and
coherence of the Scottish Government’s strategic financial
planning documents needs to be matched by – and not
undermined or contradicted by – ad-hoc funding
announcements and unilateral policy initiatives. In particular,
the Scottish Government cannot keep adding to policy
commitments without sustainable funding being available. In
the recent past there have been multiple policy funding
announcements which Local Government is required to
deliver in addition to its existing statutory and core services.
Examples range from the continuation of expansion of free
school meals, place-based and town centre funding, removal
of instrumental tuition fees, electric vehicles infrastructure,
playpark renewal and reduction in class contact time in
schools. 
While such policy areas undoubtedly have their merits, there
is little or no discussion on whether they are the best priorities
with limited resources, which best achieve outcomes, and
fundamentally they do not address Local Government’s core
funding pressure. Either sustainable funding must be
provided both for existing policy commitments delivered by
Local Government in addition to core services, or there needs
to be a wholesale re-prioritisation of policy areas, as these
cannot simply be added to with the expectation that Councils
will fill the gaps. 
We would also suggest that greater collaboration is needed in
the governance around Scotland's National Strategy for
Economic Transformation (NSET), which better aligns
priorities and budgets across the Scottish Government and
agencies, so that Local Government can work more easily
alongside its partners, to focus more clearly on the economic
outcomes we are trying to achieve collectively, with less
siloed decision making. 
89

Page 90

90

Page 91

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Director of Health and Social Care  
Subject: Care Reform (Scotland) Act – Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Committee with an update on the Care Reform (Scotland) Act which
received Royal Assent on 22 July 2025
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the update on the Care Reform (Scotland) Act be noted.
[1recs]
3. Background
3.1. The National Care Service (NCS) (Scotland) Bill was published in June 2022
providing for the establishment of a NCS under the responsibility of Scottish
Ministers.  The NCS Bill as published in June 2022 provided for the transfer of listed
social care and social work local authority functions, staff and assets to Scottish
Ministers or newly established care boards. 
3.2. In common with the approval process of other legislation, the then NCS Bill
proceeded through three stages: 
 Stage 1 – consideration of the general principles of the Bill by Parliamentary
Committee(s) and a debate and decision on these by the Parliament.
 Stage 2 – detailed consideration of the Bill by Parliamentary Committee(s).
 Stage 3 – final consideration of the Bill by the Parliament and a decision whether
it should be passed or rejected. 
After a Bill has been passed and has received royal assent, it then becomes an Act
of Parliament with implementation to follow. 
3.3. Progress with the development of a NCS and the associated Bill has been the
subject of previous updates to Executive Committee in August 2022, February 2024,
August 2024 and February 2025. 
12
91

Page 92

4. Updated Position
4.1. On 23 January 2025, the Minister for Social Care, Mental Wellbeing and Sport made
a statement to the Scottish Parliament confirming the Scottish Government’s
intention to remove Part 1 from the Bill and proceed with Parts 2 and 3 only. 
https://www.gov.scot/publications/ministerial-statement-future-of-the-national-care-
service/ 
4.2. The name of the Bill was changed as a result of Stage 2 amendments because it
could no longer be reasoned that the Bill was establishing a NCS. 
4.3. On 10 June 2025 the Scottish Parliament passed the now Care Reform (Scotland)
Bill at Stage 3. Information on the amendments introduced as part of the conclusion
of Stage 3 are available here: 
https://spice-spotlight.scot/2025/06/09/the-care-reform-scotland-bill-formerly-
national-care-service-scotland-bill-the-final-hurdle/ 
4.4. The Care Reform (Scotland) Act 2025 received Royal Assent on 22 July 2025. 
4.5. In summary the Care Reform (Scotland) Act 2025: 
 enshrines Anne’s Law into legislation to uphold the rights of people living in adult
care homes to see loved ones and identify an essential care supporter
 strengthens support for unpaid carers by establishing a legal right to breaks
 empowers people to access information on their care and improving the flow of
information across care settings
 improves access to independent advocacy to guarantee people are heard and
involved in decisions about their own care
 creates a National Chief Social Work Adviser role to provide professional
leadership and champion the sector, as part of plans for a new National Social
Work Agency 
https://www.gov.scot/news/care-reform-scotland-bill-passed/ 
4.6. Alongside the Act, a non-statutory advisory board will be established to drive
progress and scrutinise reform, replacing an interim advisory board that met for the
first time in May 2025. 
https://www.gov.scot/groups/national-care-service-interim-advisory-board/ 
5. Employee Implications
5.1. The delivery of amendments may require significant additional staffing capacity for
which costings have not been provided as yet at a time when there continues to be
significant demand and resource challenges for health and social care as highlighted
by Audit Scotland. 
https://audit.scot/publications/integration-joint-boards-finances-continue-to-be-
precarious 
6. Financial Implications
6.1. The delivery of currently uncosted amendments to the legislation may require
significant additional funding at a time when health and social care budgets are
already subject to considerable pressures as highlighted in Audit Scotland. 
92

Page 93

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in 
terms of the information contained in this report. 
8. Other Implications
8.1. The Council’s top risks are currently being reviewed and evaluated.  Part of these
considerations will be a review of the current risk status of the NCS for the Council. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce any new policy, function or strategy or recommend a
change to existing policy, function or strategy, and therefore, no impact assessment
is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Professor Soumen Sengupta
Director, Health and Social Care 
15 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, efficient, effective and transparent 
Previous References
 Executive Committee - Response to National Care Service Bill (August 2022)
 Executive Committee - National Care Service Update (February 2024)
 Executive Committee – National Care Service Update (August 2024) 
 Executive Committee – National Care Service Update (February 2024) 
List of Background Papers
 Care Reform (Scotland) https://www.legislation.gov.uk/asp/2025/9/contents/enacted 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Professor Soumen Sengupta
Director, Health and Social Care
E-mail: soumen.sengupta@southlanarkshire.gov.uk 
93

Page 94

94

Page 95

Report
Agenda Item 
To: Executive Committee
Date: 27 August 2025
Prepared by: Chief Executive  
Subject: Good Food Nation Plan and Call for Evidence 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the upcoming Scottish Government guidance on the
development of a Good Food Nation Plan (GFNP) and current progress
 provide the Council’s response to the Scottish Parliament’s Call for Evidence on
the Good Food National Plan, which was submitted to meet the deadline of 15
August 2025 
[1purpose]
2. Recommendation(s)
2.1. The committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted; and
(2) that the attached Council response to the call for evidence be noted. 
3. Background
3.1. The Good Food Nation (Scotland) Act 2022 places a legislative duty on Scottish
Ministers, local authorities and territorial health boards to create Good Food Nation
Plans. The Scottish Government is in the process of preparing a national GFNP,
which will be finalised during 2025.   
3.2. The proposed GFNP was laid before the Scottish Parliament on 27 June 2025 and
can be accessed here: https://www.gov.scot/publications/proposed-national-good-
food-nation-plan/. 
3.3. When enacted, Section 10 requires each “relevant authority” including local
authorities to publish a GFNP. This means that, as things stand, the council will be
legally required to publish a GFNP for the area within a period of 12 months, starting
from the date upon which the provision is commenced. (Note: the time period is
under review following feedback from relevant authorities.) From a wider South
Lanarkshire perspective, the duty also falls to NHS Lanarkshire, which is required to
publish a separate plan.   
3.4. GFNPs should bring together the actions that relevant authorities are taking or will
take to address a wide range of food related issues. The Act requires these plans to
have regard to the scope for food-related issues to improve outcomes relating to
social and economic wellbeing, the environment, health and physical and mental
wellbeing, economic development, animal welfare, education, and child poverty. 
13
95

Page 96

3.5. The production and delivery of the council’s plan will require input and action from
various services including Procurement, Education, Social Care, Economic
Development, Environmental Protection, Leisure and Cultural Services, and Waste
Management. 
3.6. When preparing the plan, the council must publish and consult on a draft of the plan
and have regard to any responses received. 
3.7. When consulting, the relevant authority must have regard to the importance of
communicating in an inclusive way, and the importance of communicating in a way
that is effective in engaging children and young people. 
4. Key Dates and Considerations
4.1. It is expected that the national GFNP will be enacted by the end of 2025.  Following
this, local authorities and health boards will have at least 12 months to develop their
local plans. 
4.2. There is still some uncertainty about the final content of the GFNP. However, the
requirement for local plans to “have due regard” to the national GFNP will include a
requirement for a statement to demonstrate how the council has had due regard to
the national plan and the food-related issues it raises. There is likely to be
commonalities across all of Scotland’s plans, but local plans do not need to mirror
national plans. 
4.3. A new statutory instrument will also be introduced requiring all relevant public bodies
to “have regard” to our own local GFNP when conducting “specific functions” in either
policy or actions.  Further information and a list of the specified functions are
expected to be published with the national plan. 
4.4. The council is required to report progress against the delivery of its outcomes every
two years and to complete a full review of the plan every five years.  As part of the
duties, the plan must have outcomes, indicators, measures and list the related
policies. 
4.5. Authorities may consider joint and regional plans, though each relevant body
participating in them must be able to demonstrate how they individually meet their
duties in the production and reporting of the plan. Legal advice is recommended for
all partners considering a joint plan. 
4.6. Funding to support the development of plans is being discussed by COSLA and the
Scottish Government. There is no information relating to any discussions on funding
to support the implementation of the plans. 
5. Scottish Parliament Call for Evidence
5.1. A Call for Evidence on the Good Food Nation National Plan was received on 1 July
2025 from the Scottish Parliament’s Health, Social Care and Sport Committee and
the Local Government, Housing and Planning Committee. These seek views on what
changes organisations would like to see reflected in the finalised national plan. 
Questions focus on the following four areas: 
• Public health, health services and social care; 
• Local government’s role in delivering the aims of the GFNP, particularly through
procurement, allotments and community growing; and 
• Any other aspect of the plan organisations want to provide feedback on.   
96

Page 97

5.2. A copy of the council’s response is attached at Appendix 1. The deadline for
responses was 15 August 2025, so a draft of the response was shared with Group
Leaders in advance of submission and in advance of this report to Executive
Committee. 
6. Next Steps
6.1. While awaiting the final national GFNP and legislation, a Food Lead Officer within the
council’s Community Engagement Team has been appointed as the main point of
contact for the Scottish Government and is collaborating with colleagues in 
NHS Lanarkshire and North Lanarkshire Council to ensure a cohesive approach. 
6.2. The Lead Officer has been working with the University of Edinburgh’s Good Food
Nation Living Lab to explore how local authorities can best develop their local plans. 
This work will also focus on South Lanarkshire’s specific food system data and how
we compare with other parts of Scotland. 
6.3.  Officers have also been working with the Sustainable Food Places (SFP) Network in
Scotland to help create a collaborative and systems-led approach to developing the
council’s plan. 
6.4. Officers have also been working with VASLan to develop a South Lanarkshire
Community Food Partnership Network, which will support the effective development
and delivery of the plan at a place-based level. Shared Prosperity Funding will
support the start-up and first year of development costs for this network. Thereafter,
it will need to be self-sustaining. 
6.5. The council will continue to work with third sector organisations to collect data on
food poverty and consider other available data sets through working closely with
colleagues analysing date for the Marmot Place Programme.  The Food Lead Officer
will also establish an internal working group of officers to support the development of
the plan. This will be facilitated by the Community Engagement Team. 
7. Employee Implications
7.1. As Scottish Government funding commitments are not known, the development and
delivery of the plan will be completed using existing council resources.   
8. Financial Implications
8.1. Any financial costs associated with the development of the plan will be met from
existing budgets.  As indicated elsewhere in this report and appendix, discussions
about potential future funding are ongoing between local authorities and the Scottish
Government. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. There are no impact assessment issues arising from this report, though the council’s
Good Food Plan will be subject to an IIA. There is also a requirement for that plan to
be subject to public consultation.   
Paul Manning
Chief Executive 
30 July 2025  
97

Page 98

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
 Focused on People and their Needs
 People Live the Healthiest Lives Possible 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Jen Kerr, Community Engagement Manager
Phone: 0303 123 1017
Email: Jennifer.Kerr1@southlanarkshire.gov.uk 
98

Page 99

Appendix 1 
Scottish Parliament Good Food Nation National Plan Call for Evidence   
Draft Response 
1. Thinking about those aspects of the proposed National Good Food Nation Plan
related to public health, health services and social care, what, if any, specific
changes would you like to see reflected in the finalised national plan? 
The links between good food and physical and mental health are well made within
the plan.  However, affordability is key, and food insecurity is increasing. Research
by the Joseph Rowntree Foundation shows that in 2024 one million people in
Scotland were living in poverty. 
Food insecurity is also linked to poor educational outcomes, physical and mental
health challenges and wider community wellbeing.  Different local authority areas
have different policies around provision and cost of school meals – to take the
uncertainty and stigma away from children and young people this area needs
consideration. Breakfast provision should also be looked at as many young people
may only eat at school. The free school meal expansion pilot to S1 – S3 pupils in
eight local authorities in August 2025 should be closely monitored to measure the
impact this has on learning and wellbeing (both physical and mental wellbeing). 
Outcome 3 and the measures are laudable. However, to increase uptake in healthy
foods, fruit and vegetables they require to be affordable and accessible across
communities. Some communities are further impacted due to transport links.   
As noted in the Plan, the Scottish Dietary Goals (SDGs) are overdue a review.
However, in our view the plan currently misses an opportunity to recognise the
impact of diets high in Ultra Processed Foods (UPFs), particularly those associated
with high fat, salt and sugar. UPFs currently make up more than half the average
shopping basket, and two-thirds of children’s daily energy intake in the UK. The
SDGs should reflect this with a focus on re-balancing diets with increased
consumption of plants, less and better meats, and minimally-processed foods. 
Additionally, we would like the Plan to show a commitment to early years nutrition,
including increased support and initiatives to keep raising breastfeeding rates, where
appropriate and desirable. 
We would further suggest that stronger links require to be made with local
development planning. In addition, links to the Population Health Framework and the
learning that emerges from the Collaboration for Health Equity in Scotland pilot
(Marmot). 
Community Planning Partnerships will be key to delivering the plan as well as
Community Wealth Building strategies and procurement strategies. Local
government links to other anchor organisations and collectively these organisations
can have a huge impact on local communities.  
99

Page 100

2. Thinking about the role of local government in delivering the Plan, particularly
through procurement, what, if any, specific changes would you like to see
reflected in the finalised national plan? 
In relation to procurement, Facilities utilise the Scotland Excel Frameworks (SXL) for
purchasing food. Therefore, to support Scottish producers and meet the
requirements of the GFN Act, these requirements need to be embedded into these
framework contracts. Working outwith these SXL frameworks would take extensive
local authority resources, to ensure that all aspect of the Food Safety Act, Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations and Allergen
management were met. 
South Lanarkshire Council’s current strategic approach to food procurement focuses
on use of collaborative contracts through Scotland Excel, including Groceries and
Provisions, Meat and Fish, Fruit and Vegetables, and Milk. Our annual spend on
food and drink is circa £5m. In addition to ensuring best value in an essential
commodity area, one of the key benefits of the collaborative contracts is to ensure
compliance with Health and Safety and Food Quality standards. Through
management information, the council is also able to identify the origin of products.
Under the council’s Community Wealth Building Strategy and Good Food Plan, the
council aims to provide local suppliers with opportunities to increase the production
of food and drink and identify opportunities to procure local food and drink products.
At present, while there are challenges in respect of product suitability, continuity of
supply and quality standards in the local food market, we also acknowledge that the
limitations presented by the procurement regulations may impact on the council’s
ability to contract directly with local suppliers in future. 
Furthermore, on worker’s rights, procurement decisions could be weighted to ensure
fair work standards, including payment of the Real Living Wage, respect for workers
and workers’ voices, expanded trade union recognition, and collective bargaining
across the sector. 
3. Thinking about the aspects of the Plan on allotments and community growing,
what, if any, specific changes would you like to see reflected in the finalised
National Plan? 
The links between community growing and good mental health and wellbeing are
made in the plan. In many local authority areas, there are long waiting lists for
allotments – making more land available would have a positive impact and should be
progressed quickly through the Community Empowerment Act.  Allotments do not
always need to be run by local authorities, however. Land could be used for
community organisations to grow and run allotments as well. 
Access to green space and being able to grow your own food cannot be
underestimated in terms of people’s health and even their sense of community.  This
could have additional benefits – for example, to address social isolation, and to
provide learning opportunities for people of all ages.   
There is reference in the Plan to a thriving food culture – this could mean different
things to different people. It therefore needs to be defined more clearly and take
account of the fact that food insecurity is increasingly prevalent, and that therefore
this “culture” is not always accessible to everyone.   
100

Page 101

While there is a planning element to food growing and use of public land for
allotments, there is scope in the plan to include wider opportunities for food growing
at home, whether in the garden or in a container, or in nurseries/schools/colleges
and public sector buildings where land is available and suitable for this purpose.
‘Education’ is one of the 7 key scopes of the Good Food Nation Act but there seems
to be a lack of indicators around how this relates to community growing, for example
the number of schools which have growing spaces, and also where food sits in terms
of the curriculum. 
4. Thinking about other aspects of the Proposed National Good Food Nation Plan
(not covered above), what, if any, specific changes would you like to see
reflected in the finalised National Plan? 
Further discussion and clarification around funding would be welcome as the plan is
developed. This will be important in terms of delivering outcomes, given increasing
food costs and the impact on council resources to manage and meet all the
requirements on the Plan. 
The council also shares concerns raised by the sector around timescales,
specifically in relation to the period that will be available to have local plans
completed, consulted on and approved. Neither the drafted 12 months, nor the
additionally discussed 18 months, seem sufficient for this work to be completed. 
We would suggest further that information in relation to alcohol requires to be
expanded in the plan, as the only references to alcohol currently seem to be in
relation to supporting the Scottish drinks industry and the wider economy. There are
many other factors that need to be factored in, including the negative impact on
health and on personal finances, as well as the impact on food insecurity and
alcohol-related harm. 
The Plan provides a comprehensive summary of related policies and how these
impact on the outcomes of the Plan. The ultimate impact of these will be dependent
on the public’s wider knowledge of them and how these are articulated. 
Again, the link to poverty will determine the impact of the Good Food Plan. While the
focus of the Plan is on the delivery of long-term ambitions relating to good food, there
continues to be significant challenges for many individuals and families who continue
to experience food poverty regularly. A stronger focus in the Plan on addressing the
immediate issues would be helpful, with perhaps an additional shorter-term
aspiration (aligned to the long-term ambition) which addresses the provision of good
food at the point of crisis. However, this may already be a planned feature in an
associated delivery plan. 
There are challenges around understanding food-related challenges and the levels of
food poverty due to data availability and at a geographical level. It would be helpful if
national data sets were available at lower geographical levels to support better
targeting of local interventions. Maps of food deserts, particularly in relation to our
most deprived areas would also be helpful to identify where individuals and families
may be paying a poverty premium, particularly in rural areas. Perhaps some joint
collaboration between local partners and the Scottish Government could support the
development of localised data/dashboards. These might start with the list of targets
and commitments set out at Annex C of the plan.  
101

Page 102

In accordance with the Community Empowerment Act 2015, there could be a
stronger focus on community empowerment in relation to tackling local food
challenges. This would provide more support from the government to strengthen the
role of communities through supporting local and innovative solutions which provide
dignity and choice and long-term food support, such as through local Community
Food spaces.  This would build community cohesion and resilience while also
delivering a wider range of benefits for individuals and families, linking to other
policies such as food waste, social isolation, and mental health and wellbeing.     
While there is mention in the Plan of cooking skills, it may be helpful to strengthen
this and further address the connection between having access to good food and the 
skills/knowledge for food preparation and cooking a healthy meal using a range of
ingredients. Some individuals and families also find the cost of preparing and
cooking food a barrier. They may not be able to afford the electricity or gas to cook a
meal and may prefer low cost, less nutritious alternatives. This may have a strong
influence on food choices, particularly for those with low incomes. 
Consideration could also be given to national and local local tree planting strategies
for the planting of orchard trees, particularly planting in community settings. 
Finally, wherever possible local authorities and health boards should be strongly
encouraged to use the same metrics in their Local Good Food Nation Plans as in the
National Plan - this will help facilitate learning across Scotland and allow for the most
effective tracking of progress towards becoming a Good Food Nation. This would
further support the requirement for close collaboration between local authorities and
health boards – and would be a further step to emphasising effective partnership
working. 
102

Page 103

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject:    Council Complaints Report: SPSO Annual Overview
2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a report on the performance of the Council’s handling of complaints
received during the period 1 April 2024 to 31 March 2025
 provide customer feedback on complaint handling (Appendix 2) 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that complaints performance and areas highlighted for improvement be noted.
[1recs]
3. Background
3.1. The Council is required to monitor and assess complaints handling performance to
provide assurance in relation to how it has performed, to facilitate continuous
improvement, and to assist in benchmarking performance between local authorities.
The performance indicators for the Scottish Public Sector Ombudsman (SPSO)
model complaints handling procedure (MCHP) are the minimum requirements for a
local authority to self-assess and report on performance, and to undertake
benchmarking activities.  
3.2.  Compliance with the MCHP is monitored by the SPSO on an annual and quarterly
basis. 
4. Overview
4.1. Quarterly Council complaints reports are produced, and an annual report is shared
with the elected members. The Council continues to work to improve its performance
and learn from complaints to improve its services. 
4.2. The SPSO performance indicators which the Council is required to report against
are: 
Indicator 1 -  complaints received per 1,000 of population 
Indicator 2 -  % of closed complaints at each stage
Indicator 3 -  average time in working days to respond to complaints at each stage 
Indicator 4 -  % of complaints upheld, not upheld, and resolved
14
103

Page 104

5. Indicator Performance
5.1. The latest 2022 Census information released in September 2023 estimates the
population of South Lanarkshire to be 327,200. In the period 1 April 2024 to 31
March 2025, a total of 1,298 complaints were received. This means there were 4
complaints received per 1,000 head of population, compared to 2023/2024 where
complaints were 3.4 per 1000 head of population. The complaints received in this
period are detailed in table1 (SPSO indicator 1). 
Total *number of complaints received – three-year comparison
Resource Year 2022/23 Year 2023/24 Year 2024/25
Community and
Enterprise
292 320 442
Education 288 269 253
Finance and Corporate 87 110 122
Housing and Technical 170 174 198
Social Work 232 239 283
Total 1069 1112 1298
Table 1: Complaints Received in 2022/25 
*Figures for the total number of complaints received do not include complaints that
were categorised as withdrawn or created in error, which totalled 15 for 2024/2025. 
5.2. The increases in complaints were across four resources, as detailed in the table
above, with Education and Finance and Corporate Resources having a decrease in
complaints. 
5.3. The SPSO Complaints Handling Procedure states that Stage 1 complaints are
responded to within 5 working days, and Stage 2 within 20 working days. 
The average time in working days to respond to complaints (SPSO indicator 3), are
detailed by Resource at Appendix 1, table 4. For the period 2024/2025, the average
number of days to respond at Stage 1 is 5 working days and Stage 2 is 14 working
days. 
5.4. Appendix 1, Table 3 shows that Education Resource dealt with Stage 1 complaints
within an average of 6 working days and dealt with Stage 2 complaints within an
average of 21 working days. 
104

Page 105

5.5. The data provided at Appendix 1, Table 5 is a comparison of response rates over the
last three years and shows:- 
 the average time in working days to respond to complaints at Stage 1 is being
met consistently and the average response rate is 5 days, which meets the
SPSO performance indicator
 the timescale for Stage 2 responses continues to meet the SPSO performance
indicator, and the Council’s performance over the last 3-years remains
consistent with the average time rate being 13 days
 the timescale to respond to complaints after escalation is also being achieved
consistently with the average response rate being 14 days over the last 3-years,
which meets the SPSO performance indicator 
5.6. This year, 174 complaints were escalated from Stage 1 to Stage 2 compared to 149
in 2023/2024, representing an increase of 17%. 
It should be noted that Resources have the opportunity to place complaints directly
at Stage 2 if it is appropriate rather than escalating from Stage 1 to Stage 2, as the
purpose of the two-stage procedure is to handle complaints effectively at the first
time of asking and not to have multiple attempts at resolving complaints. Where a
complaint is further escalated to the SPSO they are interested in whether the Council
has followed the procedure correctly and appropriately. 
5.7. The complaints upheld, not upheld and resolved at each stage as a percentage of
complaints closed in full at each stage in this period (SPSO indicator 4), are detailed
by Resource at Appendix 1, tables 6, 7, 8 and 9. 
5.8. Stage 1 data in Appendix 1 shows that 46% of all stage 1 complaints were not
upheld, with 32% being resolved prior to categorisation, and 22% being upheld. 
5.9. The data shows that when Stage 1 complaints were escalated to Stage 2, due to the
complainant being dissatisfied with the Stage 1 response, 78% of the complaints
remained unchanged as not upheld.  On average, Stage 1 decisions were changed
to upheld in 22% of cases. 
5.10. Stage 2 data in Appendix 1 shows that 81% of complaints received directly at Stage
2 were not upheld, with the remaining 19% being upheld. 
5.11. The data in Appendix 1 shows the number of complaints which were upheld, not
upheld or resolved as a percentage of closed complaints at Stage 1, Stage 2 and
Stage 2 escalated in 2024/2025 by Resource.          
6. Customer Satisfaction
6.1. The Council asks for feedback from customers who have used the complaints
procedure. 
This gives the Council insight into how the customer feels about how the Council has
handled their complaint and helps to inform service improvements. As in previous
years, the survey has been conducted by email with all customers who agree to
participate sent a link to the survey. This is in line with the complaints handling
procedure.
105

Page 106

To address the historically low response rate to customer feedback surveys, a new
question was added to the online complaints form in April 2024. This change aimed
to encourage more customers to opt in to receive the survey. The initiative has been
successful, resulting in an increase in survey responses from 4 in 2023/2024 to 66 in
2024/2025. The findings from the latest survey are presented in Appendix 2.  
7. National Issues and SPSO Updates
7.1. Annual Statistics 2024/2025
SPSO publish their annual statistics on their website. These detail the enquiries and
complaints they have received and determined in the past year. The full statistics are
available on the SPSO website at Statistics 2024-25 | SPSO. 
7.2 . Child Friendly Complaints
Information about the Child Friendly Complaints Handling Principles and Process
Guidance are available on the SPSO website at Child Friendly Complaints | SPSO. 
8. Learning from Complaints
8.1. The SPSO require local authorities to learn from complaints by identifying the root
cause of the complaint, taking action to reduce the risk of recurrence, and
systematically reviewing complaints to improve service delivery.  Resources are
responsible for analysing complaints data and reviewing individual complaint
performance. 
9. Employee Implications
9.1. Employees are key to effective service delivery and in trying to resolve complaints. 
Training is available to all employees through a range of methods including
eLearning, good practice and a range of information for local authorities on the
SPSO website. 
10. Financial Implications
10.1. There are no additional financial implications of this report, and the cost of the MCHP
is incorporated into current budgets. 
11. Climate Change, Sustainability and Environmental Implications
11.1. There are no climate change, sustainability or environmental associated with this
report. 
12. Other Implications
12.1. There is a risk of damage to the Council’s reputation. If complaints are not handled
effectively, there can be an adverse effect on the public perception of the Council
which can lead to a lack of trust in the services provided. 
13. Integrated Impact Assessment and Consultation Requirements
13.1. Council Resources and the Corporate Management Team have been consulted on
the data required for this report. Customers also have the opportunity to consult on
the complaints handling process. Those who give permission are invited to
participate in a feedback survey. The feedback provided by participating customers
is reported to the Corporate Management Team on an annual basis. 
13.2. There is no requirement to carry out an impact assessment in relation to the
proposals within this report. However, the learning from complaints is used to ensure
Council services are accessible to all members of the community and, wherever
possible, to prevent discrimination, harassment, or victimisation from occurring.
106

Page 107

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient, and transparent
 Fair, open, and sustainable
 Ambitious, self-aware, and improving 
Previous References
 Executive Committee of 4 September 2024 
List of Background Papers
 Monitoring information provided by each Resource.
 Complaints handling customer feedback report. 
List of Appendices
 Appendix 1 – Scottish Public Services Ombudsman’s Performance indicators from 1
April 2024 to 31 March 2025.
 Appendix 2 - Overview of responses for the complaints handling customer feedback
survey from 1 April 2024 to 31 March 2025. 
Contact for Further Information 
If you wish to inspect the background papers or want further information, please contact: -
Michelle Milne, Head of Personnel Services
Ext:  4330 (Tel:  01698 454330)
Email: michelle.milne@southlanarkshire.gov.uk 
107

Page 108

Appendix 1 
SPSO performance indicators (KPI’s) from 1 April 2024 to 31 March 2025 
Complaints closed at stage one and stage two as a percentage of all complaints
closed (SPSO indicator 2). Actual numerical figure shown in brackets. 
The term “closed” refers to a complaint that has had a response sent to the  
customer and at the time no further action is required (regardless at which stage it 
is processed and whether any further escalation takes place). 
Table 2 
Total* number of complaints closed – 1 April 2024 to 31 March 2025
Resource (total no. closed) % closed at
Stage 1
% closed at
Stage 2
% closed at
Stage 2 -
escalated from
Stage 1 
Community and Enterprise
(440)
84% (369) 4% (17) 12% (54)
Education (253) 74% (187) 9% (24) 17% (42)
Finance and Corporate (129) 86% (111) 5% (7) 9% (11)
Housing and Technical (192) 82% (158) 2% (3) 16% (31)
Social Work (272) 78% (213) 8% (23) 13% (36)
Total (1286) 81% (1038) 6% (74) 13% (174)
`Table 2: Complaints closed 
Table 3 
Three-year comparison 
Number of complaints closed at each stage. 
% closed at
Stage 1
%closed at
Stage 2
%closed at
Stage 2 –
escalated from
Stage 1
Total – 2024/25 (1286) 81% (1038) 6% (74) 13% (174)
Total – 2023/24 (1096) 79% (865) 7% (82) 14% (149)
Total - 2022/23 (1047) 84% (878) 5% (53)  11% (116)
Table 3: Three-year comparison 
108

Page 109

Average time in working days for a full response to complaints at each stage
(working days) (SPSO indicator 3) 
Table 4 
Resource  Average time in
working days
to respond to
complaints at
stage one (5-
day resolution
target) 
Average time in
working days
to respond to
complaints at
stage two (20-
day resolution
target)
Average time in
working days
to respond to
complaints
after escalation
(20-day
resolution
target)
Community and Enterprise  5 15 17
Education  6 21 16
Finance and Corporate  3 4 4
Housing and Technical  5 13 15
Social Work  5 18 15
Total Average Times 5 14 13
Table 4: Average response times in working days 
Table 5 
Three-year comparison 
Average time in working days for a full response to complaints at each stage. 
Average times Stage 1 Stage 2 Escalated
Total - 2024/25 5 14 13
Total - 2023/24 5 13 14
Total - 2022/23 4 11 14
Table 5: Three-year comparison 
Complaints upheld/not upheld/resolved at each stage as a percentage of complaints
closed in full at each stage, (SPSO indicator 4). Actual numerical figure shown in
brackets. (See table 2 for complaints closed figures). 
Upheld – failings found;
Not upheld – no failings found;
Resolved – remedial action taken prior to establishing if upheld or not upheld. 
Complaints upheld/not upheld/resolved at each stage as a percentage of complaints closed
in full at each stage in this period are shown in Tables 6, 7, 8 and 9. 
109

Page 110

Table 6 
Resource  % upheld at Stage 1 % not upheld at Stage 1
Community and Enterprise  20% (75) 38% (141)
Education 13% (24) 63% (118)
Finance and Corporate  31% (34) 46% (51)
Housing and Technical 37% (59) 48% (75)
Social Work 18% (38) 45% (95)
Total  22% (230) 46% (480)
Table 6: Complaints upheld/not upheld at Stage 1 
Table 7 
Resource  % upheld at Stage 2 % not upheld at Stage 2
Community and Enterprise  12% (2) 88% (15)
Education 33% (8) 67% (16)
Finance and Corporate  14% (1) 86% (6)
Housing and Technical 33% (1) 67% (2)
Social Work 9% (2) 91% (21)
Total  19% (14) 81% (60)
Table 7: Complaints upheld/not upheld at Stage 2 
Table 8 
Resource  % of escalated
complaints upheld
% of escalated
complaints not upheld
Community and Enterprise 13% (7) 87% (47)
Education 24% (10) 76% (32)
Finance and Corporate 27% (3) 73% (8)
Housing and Technical 35% (11) 65% (20)
Social Work 22% (8) 78% (28)
Total  22% (39) 78% (135)
Table 8: Escalated complaints upheld/not upheld 
110

Page 111

Table 9 
Resource  Number of complaints resolved at stage one as % of
all complaints closed at stage one (5 days)
Community and Enterprise 42% (153)
Education 24% (45)
Finance and Corporate 23% (26)
Housing and Technical 15% (24)
Social Work 37% (80)
Total  32% (328)
Table 9: Complaints resolved at Stage 1 
111

Page 112

Appendix 2 
Complaints handling customer feedback survey.
Overview of responses from 1 April 2024 to 31 March 2025 
Note: data based on 66 respondents 
Customers were asked to answer based on the complaints process rather than the
outcome of the complaint.
Question Answer 
Strongly
disagree
Disagree Neutral Agree Strongly
Agree
Information about the
complaints’ procedure
was easily accessible.
8% 19% 26% 40% 8%
I found it easy to make
my complaint.
13% 13% 16% 46% 13%
I was happy that the
Investigating Officer
fully understood my
complaint.
31% 19% 9% 25% 16%
I was given the
opportunity to fully
explain my complaint.
17% 20% 22% 28% 13%
The points of my
complaint were
identified and
responded to.
35% 17% 9% 29% 11%
The response to my
complaint was easy to
understand.
23% 11% 19% 37% 10%
Overall, I was satisfied
with the handling of my
complaint.
45% 12% 12% 20% 11%
I was clearly told what
the next stage of the
complaints process
was to me.
39% 8% 8% 34% 12%
I was told if the
response was going to
take longer than the
timescales (five
working days at stage
1 and 20 working days
at stage 2). 
(30% was not
applicable)
30% 27% 12% 5% 17% 
112

Page 113

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 27 August 2025
Report by: Chief Executive  
Subject: Membership Changes 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of membership changes to the Community Wealth Building Commission
and Conference Allocation Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following membership changes be noted:-
 Councillor Chalmers to replace Councillor Ross as a member of the
Community Wealth Building Commission
 Councillor Clark to replace Councillor Chalmers as a member of the
Conference Allocation Committee 
2. Background
2.1. The SNP Group advised of recent changes to its office bearers, therefore, to reflect
those changes and comply with the associated Terms of Reference, Councillor
Chalmers, as Leader of the Group, will replace Councillor Ross on the Community
Wealth Building Commission and Councillor Clark, as Depute Leader of the Group,
will replace Councillor Chalmers on Conference Allocation Committee. 
3. Employee Implications
3.1. None. 
4. Financial Implications
4.1. There are no additional costs arising from the content of this report.  The necessary
updates to Senior Councillors’ remuneration, to take account of the changes in office
bearers, have been actioned. 
5. Climate Change, Sustainability and Environmental Implications
5.1. There are no implications for climate change, sustainability or the environment from
the proposals contained in this report. 
6. Other Implications
6.1. There are no risks associated with the proposals contained in this report.  
15
113

Page 114

7. Integrated Impact Assessment and Consultation Requirements
7.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
7.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Chief Executive 
13 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council – 18 May 2022 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Susan Somerville, Administration Manager
Ext:  4197 (Tel:  01698 454197)
E-mail: susan.somerville@southlanarkshire.gov.uk 