Agenda Document Pack - Executive Committee - 28/05/2025

South Lanarkshire Council · 28 May 2025
Back to Executive Committee — 28 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 20 May 2025 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 28 May 2025
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Gavin Keatt, Susan Kerr, Ross Lambie,
Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Lesley McDonald, Davie
McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, David Shearer,
Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin Hose,
Cal Johnston-Dempsey, Hugh Macdonald, Kenny McCreary, Elaine McDougall, Mark McGeever,
Graham Scott, David Watson, 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 30 April 2025
submitted for approval as a correct record.  (Copy attached) 
5 - 16 
Monitoring Item(s) 
3 Update to Funding
Report dated 6 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
17 - 20 
Item(s) for Decision 
4 Update on the Expansion of Secondary Schools - Future Capacity Issues
Report dated 9 May 2025 by the Interim Executive Director (Education
Resources).  (Copy attached) 
21 - 26 
5 Climate Emergency Fund 2025/2026 – Project List
Report dated 8 May 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
27 - 32 
6 Delivering and Enabling Commercial Space - Programme of Activity
Report dated 8 May 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
33 - 40 
7 Council Workforce Strategy and Plan 2025 to 2027
Report dated 2 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
41 - 106 
8 Council’s Youth Champion and Representative on Regen:fx Youth Trust
Report dated 7 May 2025 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
107 - 108 
9 Community Wealth Building Legislation – Call for Views
Report dated 25 April 2025 by the Chief Executive.  (Copy attached) 
109 - 120 
Item(s) for Noting 
10  Strategic Environmental Assessment Progress 2024/2025
Report dated 8 May 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
121 - 124 
Urgent Business 
11  Urgent Business
Any other items of business which the Chair decides are urgent. 
2

Page 3

For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 30 April 2025 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Ross Clark, Councillor Gerry Convery (Depute), Councillor Andrea Cowan,
Councillor Margaret Cowie (substitute for Councillor Gavin Keatt), Councillor Maureen Devlin,
Councillor Gladys Ferguson-Miller, Councillor Cal Johnston-Dempsey (substitute for Councillor Katy
Loudon), Councillor Susan Kerr, Councillor Ross Lambie, Councillor Eileen Logan, Councillor Ian
McAllan, Councillor Catherine McClymont, Councillor Kenny McCreary (substitute for Councillor
Richard Nelson), Councillor Lesley McDonald, Councillor Elaine McDougall (substitute for Councillor
Maureen Chalmers), Councillor Davie McLachlan, Councillor Norman Rae, Councillor Mo Razzaq,
Councillor Kirsten Robb, Councillor John Ross, Councillor David Shearer, Councillor Margaret B
Walker 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Margaret Cooper, Councillor Elise Frame, Councillor Gavin
Keatt, Councillor Katy Loudon, Councillor Richard Nelson 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development; D
Hashagen, Employability Manager; K McCafferty, Carbon Management Officer
Education Resources
A Donaldson, Interim Executive Director; D Hinshelwood, Interim Head of Education (Support
Services and School Estate)
Finance and Corporate Resources
J Taylor, Executive Director; E Maxwell, Human Resources Business Manager, K McLeod,
Administration Assistant; T Slater, Administration Adviser; I Strachan, Head of Administration and
Legal Services
Housing and Technical Resources
S Gibson, Executive Director; C Jardine, Head of Property Services
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
Chair’s Opening Remarks
The Chair highlighted that today was International Guide Dogs Day, Guide Dogs for the Blind
Association being one of the nominated causes of the Council’s Touch a Life, Make a Difference
Initiative. 
1 Declaration of Interests 
No interests were declared. 
2
5

Page 6

2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 12 March 2025 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Revenue Budget Monitoring for Period 12 - 1 April 2024 to 21 February 2025 and
Probable Outturn 
A report dated 28 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the General Fund Revenue Account and the Housing
Revenue Account for the period 1 April 2024 to 21 February 2025 and the forecast for the year to
31 March 2025. 
The report and associated appendices:- 
 summarised the 2024/2025 probable outturn position for the Council’s General Fund
Revenue Account to 31 March 2025, including details of approved transfers to reserves
 provided details of the position on the General Fund Account for the period 1 April 2024 to
21 February 2025
 advised of the redeterminations of 2024/2025 revenue grant funding
 provided the Housing Revenue Account position 
The Committee decided: 
(1) that the Council’s breakeven probable outturn position, after Transfers to Reserves, as
detailed in section 4 of the report, be noted; 
(2) that the current forecast on the General Fund Revenue Account for 2024/2025 and the
actual spend as at 21 February 2025, as detailed in section 5 and appendices 1 and 2 of the
report, be noted; and 
(3) that the projected breakeven position on the Housing Revenue Account for 2024/2025, and
the actual spend as at 21 February 2025, as detailed in section 6 and Appendix 3 of the
report, be noted. 
[Reference: Minutes of 12 March 2025 (Paragraph 3)] 
4 Capital Budget 2024/2025 and Monitoring for Period 12 - 1 April 2024 to 21
February 2025 
A report dated 28 March 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April 2024 to 21 February 2025. 
The revised programme for the General Fund for 2024/2025 was £69.832 million which included
previous adjustments approved by this Committee.  The revised budget was detailed in Appendix
1 to the report. 
Appendix 2 showed a forecast for the financial year of £59.024 million, an underspend of
£10.808  million which related to timings of spend across 2024/2025 and into the new financial
year, and resulted in budget required in 2025/2026 rather than 2024/2025.  Funding for projects
remaining underspent at the financial year end would be carried forward to allow the projects to
be completed in 2025/2026.  Actual spend incurred as at 21 February 2025 totalled
£39.547 million.  Actual funding received up to 21 February 2025 was £52.627 million.  
6

Page 7

The revised Housing Capital Programme for 2024/2025 amounted to £77.248 million. 
Programmed funding for the year also totalled £77.248 million.  The funding sources were detailed
in Appendix 3 to the report.  Budget for the period amounted to £50.399 million and, as at 21
February 2025, £50.399 million had been spent. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 and
2, and the Housing Capital Programme, as detailed in Appendix 3, as at 21 February 2025,
be noted; and 
(2) that the programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 12 March 2025 (Paragraph 4)] 
5 The Employability Promise 
Prior to consideration of this item, the Chair advised the Committee that there were 2 members of
the Champions Board present who had assisted in shaping the Employability Promise, as set out
in the report. 
A joint report dated 2 April 2025 by the Executive Directors (Community and Enterprise
Resources) and (Finance and Corporate Resources), Interim Executive Director (Education
Resources) and Director, Health and Social Care was submitted on a proposal for the
development and implementation of an Employability Promise for care experienced young people. 
In response to “The Promise”, a commitment from civil society and public services in Scotland to
improve the lives of care experienced children, the Council had developed a collective corporate
approach to take forward The Plan 2022 to 2024, as set out within “The Promise”.  The Plan had
the following 4 main areas of focus:- 
 A Good Childhood
 Whole Family Support
 Supporting the Workforce
 Planning Building Capacity 
The Promise Board, chaired by the Chief Executive and attended by Chief Officers from partner
agencies, oversaw all the work being undertaken across the Partnership to achieve progress with
The Plan. 
The Promise Board also worked closely with South Lanarkshire’s Champions Board which was a
group of care experienced individuals supported by The Promise Development Team, a
collaboration between Who Cares? Scotland and the Council. 
The Champions Board had highlighted a range of issues to the Chief Executive, including their
lived experiences of employment and employability support in South Lanarkshire.  A range of
potential supports and actions were discussed, including actions that could support more care
experienced young people into employment with the Council. 
The Council currently had a range of employability supports and processes to support care
experienced young people to progress to sustainable positive destinations of employment or
further learning.  Care experienced young people requiring support to progress to a positive
destination were supported through the Council’s keyworker-based employability programmes
Aspire, for young people in the last 6 months of school) and AspireWorks, which was post-school.  
7

Page 8

The support provided was individually tailored and involved personal development, employability
groupwork, vocational training, health and wellbeing and work placements. 
Processes were in place to track the destinations of care experienced young people aged 16 to
19 and, in March 2025, there were 364 of those.  Details of the current status of those care
experienced young people were provided in Table 1 of the report. 
Information on previous initiatives was provided in Section 4 of the report.  Those programmes
had been funded by external employability budgets as supernumerary posts.  This caused
challenges when that funding period ended, and the young people had to be matched to
permanent vacancies. 
To address those challenges and provide increased opportunities for care experienced young
people to progress to Council employment, and in line with the aspirations of the Champions
Board, a Care Experience Employment Promise was proposed, as outlined in paragraph 5.2 of
the report. 
In order to deliver on the employability promise, a short-life working group would be established
to develop an action plan that would include:- 
 continued engagement with Council services to identify suitable placements in response to
need
 the development of training resources for workplace supervisors
 the development of work placement assessment processes
 the development of processes to ring-fence vacancies for young people successfully
completing work placements
 ensuring that the voices of young people with lived experience were included in the
implementation of the Employability Programme 
Officers responded to members’ questions in relation to various aspects of the report. 
The Chief Executive gave an undertaking to clarify the number of care experienced young people
who were currently employed by the Council. 
The Chair commended the collaborative work across Council services to progress the
Employability Promise, together with the involvement of the young people themselves. 
The Committee decided: that the development and implementation of an
Employability Promise for care experienced young people
be approved. 
6 Outcome of the Consultation Proposal to Realign the Catchment Areas of
Glengowan, Machanhill and Robert Smillie Primary Schools in Larkhall 
A report dated 2 April 2025 by the Interim Executive Director (Education Resources) was
submitted on the outcome of the consultation undertaken on the proposal to change the catchment
areas of Glengowan, Machanhill and Robert Smillie Primary Schools to better align new housing
developments in Larkhall to the school geographically closer, and to balance pupil numbers more
effectively. 
The current catchment areas for Glengowan, Machanhill and Robert Smillie Primary Schools were
shown in Appendix 1 to the report. 
Appendices 2 to 4 showed the proposed new catchment zones to take account of new housing
developments and to more equitably balance the pupil population.  
8

Page 9

Details of the outcome of the statutory consultation, undertaken between 28 August 2023 and 13
October 2023 were provided in Appendix 5 to the report.  This included comments from Education
Scotland. 
The report provided information on the mitigations that would be taken in response to concerns
raised in relation to the capacity for placing requests and safe routes to school. 
The Interim Head of Education (Support Services and School Estate) responded to a member’s
question in relation to timescales for realigning catchment areas. 
The Committee decided: 
(1) that, having considered the published consultation outcome report in full, the catchment
areas of Glengowan, Machanhill and Robert Smillie Primary Schools be changed to better
align new housing developments in Larkhall to the school geographically closer and to
balance pupil numbers more effectively; and 
(2) that the proposal be effective from the start of the school session in August 2026. 
7 Mid-term Review of the Council Plan, Connect 
A report dated 26 March 2025 by the Chief Executive was submitted on the mid-term review of
the Council Plan, Connect. 
Connect 2022 to 2027 had been approved in June 2022 and set out the Council’s key actions to
be delivered over its 5-year term.  As the Plan approached the mid-point, a review had been
undertaken to monitor progress and consider priorities in view of the changing internal and
external pressures impacting on the Council. 
The mid-term review did not change the core elements of the current Council Plan, namely the
vision, values, priorities or outcomes.  However, to take account of changes that had taken place
since the Plan was written, and to reflect the likely demands of the next few years, the mid-term
review highlighted the importance of the following 3 themes:- 
 the financial challenges facing local government
 messages around transformation and service redesign
 tackling poverty and prevention as an overarching consideration in the work of the Council
– fairness and the need to support the most vulnerable 
The themes had been introduced into the Council Plan through revised wording around the
priorities and were supported by significant new material to set the context and tone of the Plan.
The 6 outcomes within Connect had also been reviewed by Resources to ensure they were up-
to-date and in line with current service delivery models.   
The proposed updated Council Plan, following the mid-term review, was attached as Appendix 1
to the report. 
The Head of Communications and Strategy responded to members’ questions:- 
 confirming that climate was a priority within the Council Plan and agreed to include a
reference to the impact of climate related severe weather events
 advising that the Council Plan took a pan South Lanarkshire approach and did not focus on
localities, which would be picked up in specific Resource and Service plans
 advising that work was about to start on the next Council Plan and agreed to look at a focus
on support for care experienced young people when developing this  
9

Page 10

The Chair, as the Chair of the Community Planning Partnership Board, agreed to take forward a
suggestion to consider input from agencies that dealt with sustainability. 
The Committee decided: that the draft updated Council Plan, following the mid-term
review, be approved, subject to the inclusion of reference to
the impact of climate related severe weather events. 
8 Breastfeeding and Return to Work Policy 
A report dated 3 April 2025 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on:- 
 the Council’s Breastfeeding and Return to Work Policy
 the Council registering for the Breastfeeding Friendly Scotland (BFS) Scheme
 the Council’s next steps toward becoming an accredited Breastfeeding Friendly Scotland
Employer 
Information was provided on the key policy changes and updates which had been informed from
the NHS and benchmarking with other local authorities’ policies. 
The Committee decided: 
(1) that the Breastfeeding and Return to Work Policy, attached as Appendix 1 to the report, be
approved; 
(2) to note that the Council had registered for the Breastfeeding Friendly Scotland (BFS)
Scheme; and 
(3) to note the Council’s next steps, as detailed at section 5, to submit an application to become
an accredited Breastfeeding Friendly Scotland Employer (Bronze) in the coming months. 
9 Recommendations Referred by Resource Committees 
A report dated 2 April 2025 by the Chief Executive was submitted on recommendations referred
to this Committee by the Housing and Technical Resources Committee of 26 February 2025 and
the Social Work Resources Committee of 26 March 2025. 
The recommendation of the Housing and Technical Resources Committee was that the revised
South Lanarkshire Council Housing Repairs Policy be approved for implementation from 5 May
2025. 
The recommendation of the Social Work Resources Committee was that the proposed changes
to the current Adoption Allowance Scheme be approved. 
The Committee decided: 
(1) that the revised South Lanarkshire Council Housing Repairs Policy be approved for
implementation from 5 May 2025, as referred by the Housing and Technical Resources
Committee of 26 February 2025; and 
(2) that the proposed changes to the current Adoption Allowance Scheme be approved, as
referred by the Social Work Resources Committee of 26 March 2025. 
[Reference: Minutes of Housing and Technical Resources Committee of 26 February 2025
(Paragraph 11) and Minutes of Social Work Resources of 26 March 2025 (Paragraph
9)]  
10

Page 11

10 Composition of the Council and Membership Places 
A report dated 8 April 2025 by the Chief Executive was submitted advising of a recent change to
the composition of the Council following the resignation of Councillor Corbett from the
Conservative Group to join Reform UK and the proposed allocation of committee places. 
The Head of Administration and Legal Services provided a verbal update advising that Councillor
Lambie had resigned from the Clydesdale Licensing Board (Division 1) and it was proposed that
Councillor Corbett would take up that place. 
The Committee decided: 
(1) that the current political composition of the Council, as detailed in section 3.3 of the report,
be noted; 
(2) that Councillor Corbett be replaced by Councillor Lockhart on Community and Enterprise
Resources Committee; 
(3) that Councillor Corbett be replaced by Councillor McCreary on Licensing Committee and
that Councillor Nelson fill the vacant place as a substitute member; 
(4) that Councillor Corbett be replaced by Councillor Lockhart as a substitute member on
Planning Committee; 
(5) that Councillor Corbett be replaced by Councillor Lockhart as a substitute member on
Planning Local Review Body; 
(6) that Councillor Corbett be replaced by Councillor Nelson as a substitute member on Climate
Change and Sustainability Committee; 
(7) that Councillor Corbett be replaced by Councillor Nelson as a substitute member on Housing
and Technical Resources Committee; 
(8) that Councillor Corbett be replaced by a Conservative Group member on the following:- 
 Education Appeals Committee (from those members/substitute members not serving
on Education Resources Committee)
 Appeals Panel/Grievance and Disputes Panel (from those members/substitute
members not serving on Finance and Corporate Resources Committee) 
(9) that Councillor Lockhart be replaced by Councillor Corbett on the Rural Task Force, with
Councillor Lambie appointed as substitute member; 
(10) that Councillor Corbett be appointed as a substitute member on the following:- 
 Executive Committee
 Planning Committee
 Education Resources Committee
 Finance and Corporate Resources Committee
 Climate Change and Sustainability Committee
 Employee, Equalities, Diversity and Inclusion Forum
 Standards and Procedures Advisory Forum 
(11) that Councillor Lambie, as Leader of the Reform UK Group, be appointed to the Community
Wealth Building Commission; 
(12) that, as outlined at section 6 of the report, one of the places currently held by the SNP Group
on COSLA be allocated to the Liberal Democrat Group;  
11

Page 12

(13) that Councillor Lambie be replaced by Councillor Corbett on the Clydesdale Licensing Board
(Division 1); and 
(14) that authority be delegated to the Chief Executive, in consultation with the relevant political
groups, to finalise any outstanding memberships in implementation of the foregoing
recommendations, with a copy of the committee and forum memberships circulated following
confirmation. 
11 Nomination of Trustee to South Lanarkshire Leisure and Culture Board 
A report dated 11 April 2025 by the Executive Director (Finance and Corporate Resources) was
submitted on the nomination of a trustee to the South Lanarkshire Leisure and Culture (SLLC)
Board. 
The revised governance arrangements and constitution for SLLC were approved by the Council
at its meetings on 23 June 2021 and 15 June 2022, respectively. The constitution set out the
membership of the SLLC Board which included 14 charity trustees made up of 5 elected members
or officers of the Council, 1 representative of the trade unions and 8 who were neither an elected
member nor an officer of the Council. 
The constitution also set out eligibility criteria and the appointment process for trustees. This
process required the Council to give written notice to SLLC for the appointment of a trustee, and
to be guided by SLLC’s Nominations Committee in relation to the selection of appropriate trustees. 
There were currently 3 vacant positions for elected members or officers of the Council on the
SLLC Board and Councillor Richard Nelson had intimated his interest in an appointment to this
Board. 
The Committee decided: that Councillor Richard Nelson be nominated to fill one of
the vacant trustee positions for elected members or officers
of the Council on the South Lanarkshire Leisure and Culture
Board. 
[Reference: Minutes of 2 October 2024 (Paragraph 8) and Minutes of South Lanarkshire
Council of 23 June 2021 (Paragraph 5) and 15 June 2022 (Paragraph 9)] 
12 Scottish Government’s Call for Evidence to Inform the National Tackling Child
Poverty Delivery Plan 2026 to 2031 
A report dated 3 April 2025 by the Interim Executive Director (Education Resources) was
submitted advising of the response from the Council to the call for evidence from the Scottish
Government to inform the next National Child Poverty Delivery Plan 2026 to 2031. 
The Child Poverty (Scotland) Act 2017 aimed to measure, tackle and report on activity to mitigate
child poverty issues in Scotland.  The Act introduced a requirement for local authorities and
relevant health boards to prepare Local Child Poverty Action Reports (LCPARs) as soon as
reasonably practicable after the end of each reporting year.  Feedback on South Lanarkshire’s
LCPARs continued to be overwhelmingly positive. 
The Council’s response to the call for evidence was attached as Appendix 1 to the report. 
The Interim Executive Director (Education Resources) responded to a member’s question in
relation to the next update of the LCPAR.  
12

Page 13

The Committee decided: that the response to the call for evidence from the Scottish
Government to inform the next National Child Poverty
Delivery Plan 2026 to 2031, attached as Appendix 1 to the
report, be noted. 
13 South Lanarkshire Integration Joint Board Strategic Commissioning Plan 2025 to
2028 
A report dated 31 March 2025 by the Director, Health and Social Care was submitted providing
an update on the new Integration Joint Board (IJB) Strategic Commissioning Plan 2025 to 2028. 
The Public Bodies (Joint Working) (Scotland) Act 2014 required IJBs to prepare and agree a 3-
year Strategic Commissioning Plan that set out how resources would be directed to secure better
health and wellbeing outcomes. 
The Strategic Commissioning Plan 2025 to 2028, which had been approved by the IJB at its
meeting on 18 March 2025, was attached as Appendix 1 to the report. 
The Director, Health and Social Care responded to a member’s questions in relation to prevention
services and the relationship with the voluntary sector. 
The Committee decided: that the content of the report be noted. 
14 South Lanarkshire Council Net Zero Route Map - Scope 1 Organisational
Emissions 
A report dated 2 April 2025 by the Executive Director (Community and Enterprise Resources) was
submitted providing an update on:- 
 new climate change legislation and forthcoming changes to national carbon reduction
targets
 the position of Council services in reducing organisational carbon emissions
 the agreed proposal to develop a Council net zero route map for Scope 1 organisational
emissions 
The Executive Director (Community and Enterprise Resources) responded to a member’s
questions in relation to:- 
 the plans to meet the national targets for phasing out new petrol or diesel light commercial
vehicles, as outlined at paragraph 4.2.2. of the report
 the date of the net zero route map 
The Committee decided: 
(1) that the publication of the Climate Change (Emissions Reduction Targets) (Scotland) Act
2024, as detailed in section 3.1. of the report, be noted; 
(2) that the Council’s position, to date, in reducing its organisational carbon emissions, as
detailed in section 3.4. of the report, be noted; and 
(3) that the decision by the Climate Change and Sustainability Committee on 19 March 2025 to
approve the development of a Council net zero route map for Scope 1 organisational
emissions, as detailed in section 4.3. of the report, be noted.  
13

Page 14

In terms of Standing Order No 14, the Chair adjourned the meeting at 11.15am and reconvened at
11.21am 
15 Urgent Business 
There were no items of urgent business. 
16 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act. 
17 Heritable Disposal by Clyde Gateway Developments Limited 
A report dated 2 April 2025 by the Executive Director (Community and Enterprise Resources) was
submitted requesting approval, as was required by the Members’ Agreement, for Clyde Gateway
Developments Limited to dispose of its remaining heritable interests at Clyde Gateway East
Business Park. 
Information was provided on the Members’ Agreement between South Lanarkshire Council,
Glasgow City Council and Scottish Enterprise, as members of the Clyde Gateway Urban
Regeneration Company. 
The Committee decided: that the Council, as a member of Clyde Gateway Urban
Regeneration Company, approve Clyde Gateway
Developments Limited disposing of its remaining heritable
interests at Clyde Gateway East Business Park. 
Councillors Brown and Cowie, as Partner Directors of Clyde Gateway Urban Regeneration Company
Board, made a transparency statement at this item on the agenda 
18 Former Bairds Building, Hamilton 
A report dated 4 April 2025 by the Executive Director (Community and Enterprise Resources) was
submitted seeking approval to waive the Council’s pre-emption right over the former Bairds
building in Hamilton to allow its sale to a third party. 
Information was provided on:- 
 the background to the sale of the building
 the identification of the building as a key site to achieve the vision for the town centre
 the previous approval by the Executive Committee at its meeting on 8 May 2024 to waive
the Council’s pre-emptions right to allow the sale of the building, which had unfortunately,
not been completed 
Officers responded to members’ questions in relation to various aspects of the report.  
14

Page 15

The Committee decided: 
(1) that the Council waive its pre-emption right over the former Bairds building to allow the sale
of the building by J D Wetherspoon PLC to a third party and subsequent redevelopment of
the site; and 
(2) that the Head of Administration and Legal Services be authorised to enter into such
agreement to affect the discharge as was in the best interests of the Council. 
[Reference: Minutes of 8 May 2024 (Paragraph 15), 13 February 2019 (Paragraph 11) and 21
February 2024 (Paragraph 6)] 
19 Regent Shopping Centre, Hamilton - Proposed Assignation 
A report dated 3 April 2025 by the Executive Director (Community and Enterprise Resources) was
submitted requesting approval for consent to be granted to the assignation of the tenant’s interest
in the lease of the Regent Shopping Centre in Hamilton by the current tenant, Maration Limited to
Parial Limited. 
Information was provided on the proposed sale of the Centre and the requirement for the Council,
as holder of the ground lease, to consent to the assignation of the tenant’s interest. 
The Committee decided: that authority be delegated to the Executive Director
(Community and Enterprise Resources), in consultation with
the Head of Administration and Legal Services, to issue
consent to the assignation of the tenant’s interest in the
lease of the Regent Shopping Centre, Hamilton by the
current tenant, Maration Limited to Parial Limited on terms
that were in the best interests of the Council. 
15

Page 16

16

Page 17

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (12 March 2025)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £13.592 million, detailed in appendices 1 and
2, be noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in appendices 1 and 2 of the report. The
report details additional funding that has been reported by Resources as part of the
additional resources’ notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £12.665 million has been identified for 2025/2026. This
is detailed in Appendix 1. 
5.2. Additional Capital funding of £0.927 million has been identified for 2025/2026. This is
detailed in Appendix 2.   
5.3. The total additional funding is therefore, £13.592 million and Resource budgets will be
updated to reflect this additional funding as required.  Where appropriate, details of
spending plans will be presented to Resource Committees for approval.  
3
17

Page 18

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 12 March 2025 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
18

Page 19

Appendix 1 
Additional Revenue Funding  
Resource  Description  2025/2026
£m 
Total
£m 
Method
Community
and
Enterprise
No One Left Behind (NOLB) – Employability 
Funding of £4,683,431 provided for delivery of
NOLB employability support for the financial
year 2025/2026, supporting the vision for
economic transformation and tackling child
poverty. 
4.683 4.683 Scottish
Government
Community
and
Enterprise
No One Left Behind (NOLB) – Approach to
Employability 
Funding of £102,000 for 2025/2026 provided to
support the strategic aims of child poverty and
transforming Scotland’s economy.  
This funding is a continuation of previous
years, and a Tackling Poverty Coordinator is in
post.   
0.102 0.102 Scottish
Government
Community
and
Enterprise 
People and Place Local Authority Direct
Award (Revenue) 
Revenue funding of £0.140m provided in
connection with the People and Place Local
Authority Direct Award active and sustainable
travel behaviour change programme. 
0.140 0.140 Transport
Scotland
Social
Work
Section 27 Grant 
Section 27 ring-fenced grant funding of
£7.740m has been received from the Scottish
Government for 2025/2026 for the purposes of
delivering and commissioning Justice Social
Work Services. 
7.740 7.740 Scottish
Government 
TOTAL REVENUE FUNDING 12.665 12.665 
19

Page 20

Appendix 2 
Additional Capital Funding 
Resource  Description  2025/2026
£m 
Total
£m 
Method
Community
and Enterprise
Active Travel – Tier 1 Funding
2025/2026
The full award is £2.296 million,
however, £1.439 million of Cycling,
Walking and Safer Routes funding was
already advised and is now rolled up
into the Active Travel award.  £0.857
million is the net increase. 
0.857 0.857 Transport
Scotland (via
General Capital
Grant)
Community
and Enterprise 
People and Place Local Authority
Direct Award (Capital) 
Capital funding of £0.070m provided in
connection with the People and Place
Local Authority Direct Award active and
sustainable travel behaviour change
programme. 
0.070 0.070 Transport
Scotland 
TOTAL CAPITAL FUNDING 0.927 0.927 
20

Page 21

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Interim Executive Director (Education Resources)  
Subject: Update on the Expansion of Secondary Schools -
Future Capacity Issues 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
• outline the progress on the secondary school programme for Holy Cross High
School, St. Andrew’s and St. Bride’s High School and Uddingston Grammar
School and to recommend an implementation plan
• consider pupil growth, including new housing developments, in the identification
of any other secondary schools potentially in need of building works. 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the expansion proposals for Holy Cross High School, St. Andrew’s and St.
Bride’s High School and Uddingston Grammar School proceed to the detailed
design and tender stage, be approved; and
(2) that a City Deal Change Control Request to refine the City Deal funding across
the schools (Section 7.2), be approved. 
3. Background and Update
3.1. On 21 September 2022, the Executive Committee considered the report on Secondary
School Estate - Future Capacity Issues and agreed to consider the need for Secondary
School expansion following assessments of capacity issues at a number of schools. 
At that point, a funding bid was to be submitted to the Scottish Government’s Learning
Estate Investment Programme (LEIP).  The paper noted that dependent on funding,
the priority would be the secondary school programme. 
4. Capacity Requirements
4.1.  The planning capacity of a school (shown in column 1 below) is calculated taking
account of the teaching spaces available, the physical size of classrooms and
maximum class sizes while also allowing flexibility for curriculum choice and the fact
that classes will not always be at capacity. It differs from an efficient functional capacity
which fully maximises classroom use and assumes full classes in all rooms. 
4.2.  Pupil projections include consideration to the numbers of actual children within the
primary and secondary sectors based on the formal pupil census from October 2024,
placing request trends, S5 and S6 staying on rates, and estimate pupil growth from
housing developments. 
4
21

Page 22

4.3. The planning capacity and updated pupil roll projections at each of the schools is
identified below:- 
Table 1. Pupil Roll Predictions (October 24 Census) 
School Planning
Capacity  
Actual
2023
Actual  
2024
Est
2025
Est
2030
Addn’l
pupils -
new
housing
post 2030 
Planning
Capacity
after
building
works
Calderside
Academy  1,392  1,272 1,247 1,252 1,362 64
Refer s5.2
Holy Cross High  1,377 1,432 1,452 1500 1,649 12  1,652
St Andrew's and
St Bride's High 1,537 1,691 1,770 1,767 1,725 37  1,721
Uddingston
Grammar ** 1,522 1,341 1,335 1,405 1,650 1  1,645 
** With the application of placing request refusals it is expected that this pupil
forecast will reduce. In addition, the full impact of the change in catchment in the
Newton Farm/Hallside area will not be experienced until 2030 and beyond.   
4.4.    Table 1 shows that both Holy Cross High School and St. Andrews and St. Brides High
School are operating well above the planning capacity. This is currently being
managed on a temporary basis by the creative use of all areas within the school e.g.
making use of all available accommodation including spaces deemed as non-teaching
areas. This suggests that there is some flexibility between the planning capacity of the
school and the efficient functional capacity of a school building. However, there is a
point at which this will begin to remove too much of such space used for additional
pupil experiences such as nurture and the delivery of counselling interventions, visiting
specialists, meeting rooms for multi-agency/parent meetings or reduces the curricular
offer where class sizes run too low. Holy Cross HS will benefit from adaptation works
for August 2025 in order to ease this pressure and better support the learning and
teaching experience for pupils and staff. 
4.5. Any pupil changes which may arise from the Newton Farm/Hallside Primary Schools
consultation are not yet impacting on Uddingston Grammar School pupil roll
projections as they will not take fuller affect until 2030 and beyond. 
5. Secondary Schools Programme
5.1.  Each of the secondary schools previously identified for consideration are detailed
below, including an update on each.  They are taken in turn.   
5.2. Calderside Academy, Blantyre – Growth in pupil numbers at Calderside Academy
has not, currently, been generated to the numbers previously predicted, primarily due
to a slow down in housing completions within the catchment area. It is, therefore,
proposed to place the expansion of Calderside Academy on hold and to undertake an
annual review of pupil projections.    
22

Page 23

5.3. The revised predicted pupil numbers in 2030 is 1,362 (30 under current planning
capacity). However, post 2030 pupil numbers are estimated at 1,426, which is 34
pupils over current capacity. The school is also experiencing growth within its
Additional Support Base and is currently utilising mainstream accommodation for this
purpose. This expansion may continue in subsequent years and could reduce the
overall mainstream capacity. 
5.4.    The school expansion would be required when pupil numbers increase to the level
when action is necessary. 
5.5. Holy Cross High School, Hamilton – The school is currently operating 75 pupils over
its planning capacity. Internal adaptations to the existing school have been identified
that could provide additional teaching accommodation for up to 145 pupils. The
proposed new build extension will further increase the planning capacity to 1,652
pupils and is sufficient to cater for anticipated pupil growth. Predicted pupil numbers in
2030 are 1,649. 
5.6. It is anticipated that internal adaptation works would commence in summer 2025 and
for a further two years. Some elements of the adaptation works cannot be undertaken
until the new build element is completed and occupied. Adaptation works would
continue until summer 2027 with the new build extension completing spring/summer
2027. 
5.7. St Andrews and St. Brides High School – The school is currently operating more
than 200 pupils over its planning capacity. Internal adaptations to the existing school
have been identified that could provide additional teaching accommodation for up to
69 pupils and would be completed for August 2026. The proposed new build extension
will further increase the planning capacity to 1,721 pupils when the extension is
complete in late 2026/early 2027. The predicted pupil numbers in 2030 is 1,725.  This
planning capacity would be very close to forecast pupil numbers. Education Resources
will continue to monitor pupil numbers and housing completions, while at the same
time evaluate further proposals to increase teaching accommodation should this be
required. 
5.8. Uddingston Grammar School - Internal adaptations were undertaken during
2022/2023 and 2023/2024 to increase the pupil capacity to 1,522 pupils. Current pupil
roll projections show the next 2-3 years to reach around 1,400 pupils. A further review
of internal and external space has been undertaken and some additional internal
adaptations have been identified. The site has now largely been maximised in terms
of internal accommodation and there is little scope to provide additional external
accommodation on the site. However, there is a potential site for a small building
extension which could accommodate 1 Technical Classroom and 1 Home Economics
Classroom. Prior to this being confirmed a detailed design and construction appraisal
is required. It is proposed that these further works would be undertaken during
2026/2027 to be available to pupils for August 2027. 
5.9. These further works would bring the overall school capacity to 1,645 pupils and pupil
roll projections are 1,650 at 2030. This reflects current policy regarding placing
requests as well as the impact of the change in catchment in the Newton Farm/Hallside
area which will not be realised until 2030 (and beyond).  Pupil numbers will continue
to be monitored annually and any further works will be considered when numbers
increase to a level where action may be necessary.  
23

Page 24

5.10. Programme of Works. The target programme for the new build elements of Holy
Cross High School, St. Andrew’s and St. Bride’s High School is for a construction start
in early 2026 with completion in summer 2027. 
5.11. A programme for the proposed adaptation works at the secondary schools has been
established after further dialogue with the individual School Management Teams.
These works would be undertaken predominantly during the summer school holiday
periods of 2025, 2026 and 2027.  
6. Remainder of the Secondary Estate 
6.1.    Education Resources have continued to monitor pupil numbers against capacity at the
remainder of the Council’s secondary schools and a number of short-medium term
emerging issues have been identified. 
6.2.  This includes Stonelaw High School where adaptation works, utilising existing
developers’ contributions monies already received, are being planned to create 3
classrooms by reducing the size of the library space for August 2025. This is included
within the 2025/2026 Capital Programme.  Further assessment of opportunities to
increase capacity will be undertaken for implementation in future years. 
Table 2. Stonelaw High School Information
School Planning
Capacity 
Actual
2023
Actual 
2024
Est
2025
Est
2030
Addn’l
pupils -
new
housing 
post
2030
Planning
Capacity
of
building
works
Stonelaw High 1,392 1,325 1,353 1,375 1,577 22 1,460 
6.3.  Potential longer-term future pressures have also been identified at St. John Ogilvie
High School, Carluke High School and Larkhall Academy.  Capital funding has been
identified to undertake internal adaptations at St John Ogilvie in summer 2025 to
increase pupil capacity. Further investigation is required at St. John Ogilvie High
School to assess the most appropriate way to deal with these issues. The potential
issues at Carluke High School and Larkhall Academy are dependent on progression
of the longer-term large-scale housing development opportunities, currently identified
within the Adopted Local Development Plan. 
6.4. All other secondary schools will continue to be monitored on an annual basis, however,
no other secondary schools are predicted to be significantly over capacity at this time.       
7. Financial Implications – Capital
7.1. The overall estimated cost for the works on the 3 secondary schools of Holy Cross
High School, St. Andrew’s and St. Bride’s High School and Uddingston Grammar
School has been identified as £18.518m. The funding package to support the 3
Secondary School projects is shown in Table 3 and is made up of Developer
Contributions from a range of new housing developments in the affected school
catchment areas together with City Deal Grant, as part of the overall City Deal
Programme. 
24

Page 25

Table 3. Estimate Costs 
Secondary School Projects
Estimated
Budget 
£m
City Deal
Funding 
£m
Developers
Contributions 
£m
Total
Funding
Availability
£m 
Expansion/Adaptations at: 
- Holy Cross High School
- St ABS High School and 
- Uddingston Grammar
School 
18.518  13.520  4.998  18.518 
7.2. In terms of the City Deal Funding in Table 3, the submission of a City Deal Change
Control Request is required to refine the funding across the schools.  This includes the
realignment of City Deal funding from that outlined in the original Outline Business
Case.   
7.3. It is noted that the funding from developer contributions will be received in line with the
housebuilding activity.  The income streams which are dependent on the house-
building market, will be impacted by economic conditions, and developments may not
progress as planned. If the timing of developer contributions means a temporary
shortfall in funding, then the Council will have to borrow to manage this on a cash-flow
basis. 
8. Financial Implications – Revenue 
8.1. There will be increased property costs such as rates, utilities, facilities services and
unitary charge and the council has acknowledged the future revenue consequences
of these capital works within its medium-term financial strategy planning.  The full
property related costs would not be incurred until after each element of the project has
been completed. An estimate of these is already included in the Council’s Budget
Strategy across the years 2025/2026 to 2027/2028 (a total budget allocation of £1.520
million). 
8.2. The costs noted in section 8.1 do not include any additional teaching staff or school
support assistant requirements. (refer section 9 below). 
9. Employee Implications
9.1. For all mainstream secondary schools, the standard teacher staffing formulae is
applied annually and is dependent primarily on pupil numbers for the coming year. An
element of additional school support assistants will likely also be required dependent
upon the needs of children. This will have an implication as to the annual revenue
costs referred to in section 8.  Requirements around teacher and school support
assistants staffing will be covered within the Council’s Revenue Budget Strategy. 
10. Next Steps 
10.1. As both Holy Cross High School and St. Andrew’s and St. Bride’s High School are
already operating beyond their planning capacity, it is proposed to progress planning
and delivery of the smaller internal adaptations works. This would be undertaken via
a ‘request for work’ through the PPP contract and will help to release teaching
accommodation back to the school and ease the pressure being experienced. These
works would be undertaken predominantly during the summer school holiday periods
of 2025, 2026 and 2027. Works at Uddingston Grammar School will be developed over
2025 for implementation in 2026.  
25

Page 26

10.2. In respect of the new build elements at Holy Cross High School and St. Andrew’s and
St. Bride’s High School detailed design and tender documentation preparation are
underway and are targeted to be submitted in September 2025. Subject to formal
approval of tenders, the construction works would be targeted to commence in early
2026 and be completed summer 2027. 
11. Climate Change, Sustainability and Environmental Implications 
11.1. The new build elements will be designed to meet the requirements of the Council
energy performance certificate rating of ‘A’, which will significantly reduce carbon
emissions from the building during its lifespan. This will be accomplished by utilising
renewable energy technologies.  
11.2. Throughout the design stage, opportunities will be explored to utilise DfMA (Design for
Manufacture and Assembly) and MMC (Modern Methods of Construction) processes
to minimise waste on site, including a review of the mechanical, electrical and
plumbing system design to pre-fabricate off-site, factory applied pre-fire painted
structural steel work. 
12.  Other Implications
12.1. None. 
13. Integrated Impact Assessment and Consultation Requirements
13.1. The monitoring of pupil growth and measuring this against the capacity of the school
is not a new policy, however, given the capital works required, an integrated impact
assessment will be completed as the project is progressed. Consultation has taken
place within Education Resources, and also with Community and Enterprise and
Housing and Technical Resources. 
Anne Donaldson
Interim Executive Director (Education Resources) 
9 May 2025 
Link(s) to Council Values/Priorities/Outcomes
♦ Inspiring learners, transforming learning, strengthening partnerships
♦ Our children and young people thrive
♦ Accountable, effective, efficient and transparent 
Previous References
 Executive Committee Report 21 September 2022:
 Secondary School Estate - Future Capacity Issues
 Proposal for a New Social, Emotional and Behavioural Needs (SEBN) Secondary
School building (KEAR School) 
List of Background Papers
♦ None. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
David Hinshelwood, Interim Head of Education (Support Services and School Estate)
Tel: 01698 845 4468 (ext. 4468)
E-mail: David.Hinshelwood@southlanarkshire.gov.uk 
26

Page 27

Report
Agenda Item       
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Climate Emergency Fund 2025/2026 – Project List 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide Executive Committee with an update on the recently announced Scottish
Government funded Climate Emergency Fund 2025/2026
 seek approval from Executive Committee for the proposed spend profile for the
fund within South Lanarkshire Council
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee are asked to approve the following recommendation(s):-
[recs]
(1) that the recommended spend profile for the Climate Emergency Fund 2025/2026
allocation for South Lanarkshire Council be approved.
[1recs]
3. Background
3.1. In the 2025/2026 Scottish Budget on 4 December 2024, it was announced that, as part
of the Local Government Settlement, an allocation of £40 million nationally has been
provided for Climate Emergency Funding. This is fully funded from one-off ScotWind
funding. 
3.2. The Council’s share of this funding is £2.198 million and is included in the General
Capital Grant funding from the Scottish Government. Details of the climate fund were
presented to full Council on 26 February 2025 as part of the 2025/2026 Capital
Programme Update, and it was agreed that a list of potential climate projects would
be brought back to Elected Members for approval at the June 2025 Executive
Committee. 
3.3. In March 2025, the Council was advised that the purpose of this funding is to scale up
existing projects such as renewable energy, public transport and active travel
networks; this is not an exhaustive list of eligible project areas and other suggestions
with a clear benefit in terms of addressing the climate emergency were considered.
Local authorities have also been encouraged to invest in new and innovative projects
that will tackle the climate emergency, particularly opportunities that will also stimulate
the economy and provide additional jobs. 
3.4. In terms of reporting requirements, the Council has been advised that the Scottish
Government will likely require feedback on the outcomes being delivered by the spend.
Although the Council has control over how this allocation is spent, the fund must be
spent on projects which fit the criteria and for which evidence can be provided,
enabling transparent reporting to the Scottish Government. 
5
27

Page 28

4. Project Proposals
4.1. In identifying the list of projects within South Lanarkshire, a series of meetings and
discussions were held with Enterprise and Sustainable Development Services; Roads,
Transportation and Fleet Services; Facilities, Waste and Grounds Services; Property
Services, Education Resources and Finance and Corporate Resources. Further
meetings were then held with proposed project lead officers to better understand
project scope, costs and timescales; and discussions have taken place with Finance
and Corporate Resources to confirm proposal eligibility. 
4.2. The table below details the list of proposed projects with lead Service, cost, any
substitution arrangements, and timeline for delivery noted against each project.
Deliverability of the projects, and eligibility in line with the fund priorities, have been
key to their selection: 
Project Project detail Timescales Lead Cost
£m
Clyde
Walkway
repairs
Clyde walkway is part of the national path network
and has a number of wooden structures stairs and
boardwalks which despite being repaired are now
needing replaced. These are large structures in
remote inaccessible locations which need to be
dismantled, and then new ones built on site. 
Benefits of undertaking this work are: greater use of
the national walkway so improving health and
access; and mitigating the reputational risk of not
allowing safe access to the walkway. 
Confirmed
deliverable by
March 2026 
FWG
Services 
0.540
Nature
Restoration
Fund top-up
Top-up funding for existing projects delivered through
Nature Restoration Fund (NRF). 
£550k funding for project anticipated through NRF. 
The focus of the additional funding to the right will be
on clearing areas for replanting, improved signage,
expanding pollinators for the 17 LNRs, upgrading or
putting in new paths, and temporary staff costs to
carry our survey work. 
Benefits of the project are linked to: improving
people’s health by creating better access; and
compliance with legislation linked to biodiversity and
climate change.
Confirmed
deliverable by
March 2026 
FWG
Services 
0.200
Country
parks
upgrades
Funding to carry out upgrade works in two country
parks in line with Country Parks Masterplans. 
This additional money will help with infrastructure
such as the pathway network, small wooden
structures, bridges, etc. 
Benefits of this project are: improved access and
health benefits; and mitigating reputational risk of
paths being closed due to required repairs.
Confirmed
deliverable by
March 2026 1 
FWG
Services 
0.140
Low carbon
road
resurfacing
Warm-mix asphalt trials at five sites. 
The condition of the current roads asset is such that,
the existing Roads budget, including the recent £4m
additional funding, is needed to deliver tried and
tested solutions related to priority scheme lists for
roads surfacing; it does not cover trials. 
Confirmed
deliverable by
March 2026 
RTF
Services 
0.462 
1 Potential to scale up project if more Climate Emergency Fund becomes available.
28

Page 29

Project Project detail Timescales Lead Cost
£m
Benefits of the project include less carbon/energy in
manufacture, potential for lower maintenance
requirement and longer lifespan. 
Traffic signal
replacement
Replacement of halogen traffic signals with LED
alternatives in challenging locations where full
crossing/junction replacement is required due to
compatibility issues caused by the age of the assets. 
There are financial benefits to the Council in
undertaking this project: changing to low voltage
traffic signals is more energy efficient and therefore
cost efficient. 
Confirmed
deliverable by
March 2026
RTF
Services 
0.250 
New EV
charging
installation
Installation of electric fleet charging infrastructure at
SLC depots (£120k) and Montrose Crescent (£30k),
thereby supporting the continued electrification of the
Council’s vehicle fleet.   
The proposal for Montrose Crescent car park will
increase the number of charge points from 16 to 32.
Site surveys also required to determine capacity at
some sites. Potential requirement for Distribution
Network Operator applications at sites to upgrade
capacity. 
Immediate benefits of the transition to EVs are
reduced emissions and lower fuel and maintenance
costs. 
Confirmed
deliverable by
March 2026
RTF
Services 
0.150 
Composting
pilot
Fully fund pilot and subsequent roll-out (on
assumption of pilot success).
Composters would only be for grass and garden
waste – not food waste.
Promotion costs for composting initiative included.
Confirmed
deliverable by
March 2026 
Pilot to run first 
FWG
Services 
0.015
Disposable
dishware
reduction
pilot
Pilot the removal of disposable plates and cutlery in
high schools, replacing with re-usable plates, cups
and cutlery. Project would run from August 2025 (in
new school year). 
Consultation with Education Resources in advance of
roll-out. The pilot will evaluate any benefits of
replacing disposable items with re-usable items. 
Confirmed
deliverable by
March 2026 
FWG
Services 
0.011
Sports
floodlighting
upgrade 
Upgrade of floodlighting from metal halide to LED at
three sports facilities – Bent Pavilion; Ballerup
Pavilion; and Jock Stein Centre.
Confirmed
deliverable by
March 2026 
Property
Services 
0.114
PV
installation –
South
Lanarkshire
Lifestyles
Carluke
Installation of PV panels following SPF 24/25
feasibility work on non-school council buildings. 
Potential for 14.84% monthly saving on energy bills.
Confirmed
deliverable by
March 2026 
On site
Sept/Oct 2025 
Property
Services 
0.066
Smart
storage
heating
controls
Installation of Connected Response smart controls in
flats which have existing storage heating systems
(within a proportion of SLC housing stock – estimated
250 property pilot). 
Estimate of 35% saving for tenants across their
heating and hot water, from the efficiency of dynamic
weather compensation. 
Confirmed
deliverable by
March 20262 
Housing
Services 
0.070 
2 If no match funding found for project, then project can be downsized.
29

Page 30

Project Project detail Timescales Lead Cost
£m
Seeking £70k match from Social Housing Net Zero
Fund.
Heat
Network /
Heat Pump
Feasibility
Studies
Funding to enable further development of heat
network and heat pump opportunities across South
Lanarkshire3. Potential feasibilities and pilots
identified include: 
• study to further develop one of the nine potential
heat network opportunities identified within
LHEES.
• heat pump accelerator pilot in partnership with
Glasgow City Council to demonstrate
effectiveness of heat pumps
• heat network feasibility with Scottish Water
Horizons exploring Bothwell Road based
network.
The study will assess the costs and benefits of a heat
networks and heat pumps, including a consideration
of impact on tenants and owners.
Confirmed
deliverable by
March 2026 
Housing
Services 
0.090
KEAR
Campus
Sustainability
Measures
Costs to carry out feasibility study and options
analysis (£20k) on potential new low carbon heating
and hot water systems, leading to future installation
at KEAR Campus as part of any wider upgrade works
to be undertaken. 
Installation of PV panels at KEAR Campus to
increase renewable energy generation on-site (£50k). 
Confirmed
deliverable by
March 2026
Education
Resources 
0.070 
School
uniform
recycling
pilot
Develop online system/app to allow families to
access free reusable school uniforms which can then
be delivered to, and collected from, local school.
Aligns with Youth Forum’s three main priorities.
Confirmed
deliverable by
March 2026 
Start of new
school year. 
Education
Resources 
0.020
Total cost    2.198 
4.3.  The proposed spend profile for the Climate Emergency Fund 2025/2026 allocation is
equal to the allocated amount of £2.198 million. The budget will be managed
throughout the year to ensure that the fund achieves full spend, and that there is no
overspend. A flexible approach will be taken to the management of the Fund, ensuring
that where risk of overspend or underspend is identified the spend profile can be
adjusted accordingly to ensure full spend within budget and timescales, potentially
bringing in replacement projects aligning with Fund criteria. Regular progress
meetings will be scheduled with project lead officers to facilitate this. Individual projects
will be managed by the project leads over the course of the delivery timeline. 
5. Employee Implications
5.1. There are no employee implications as a result of this report.   
3 Potential to carry out further studies if more Climate Emergency Fund becomes available.
30

Page 31

5.2. In terms of employee implications, lead officers will be asked to lead on project delivery
and to communicate regular updates to Sustainability Team officers coordinating the
Climate Emergency Fund 2025/2026 allocation. This would include any project
changes or issues such as underspend and overspend concerns, and substitutions. 
6. Financial Implications
6.1. Section 3.2. details the funding available in-year of £2.198 million with a breakdown of
proposed spend included at 4.2. There are financial risks related to ability to procure
contracts/materials within required timescales. This will be monitored and managed
as part of the overall spend of the fund, as set out in 4.3. Council-wide, the risk of
underspend/overspend of the full Capital Programme is managed through four weekly
Investment management meetings. Regular updates on spend associated with the
Climate Emergency Funding will be provided to Finance and Corporate Resources
and reported as part of the overall Council capital programme to committee. 
7. Climate Change, Sustainability and Environmental Implications
7.1. Projects noted at Section 4 have been all been proposed in alignment with the
specified priorities of the Climate Emergency Fund, notably the ambition to accelerate
and scale up action to address the climate emergency. 
7.2. The proposed projects will make a significant contribution towards delivering the
priorities identified within South Lanarkshire Council’s Sustainable Development and
Climate Change Strategy. Further, the projects also align with the Council’s
commitment to the three duties of the Climate Change (Scotland) Act 2009: to
contribute to national emissions reduction targets; help deliver the national adaptation
programme; and to act sustainably. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme, which includes the
Climate Emergency Funding, is an underspend/overspend. The risk has been
assessed as low given the detailed project management plans prepared and
monitored for each project. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. An Integrated Impact Assessment (IIA) has been undertaken as part of the full Capital
Programme which includes the Climate Emergency Fund allocation. Project specific
IIAs should be undertaken where determined to be appropriate and at the appropriate
point in development for the agreed projects. 
9.2. Consultation was undertaken with relevant services to identify project options for the
2025/26 Climate Emergency Fund allocation. 
David Booth
Executive Director (Community and Enterprise Resources) 
8 May 2025  
31

Page 32

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 South Lanarkshire Council, 26 February 2025, 2025/2026 Capital Programme Update 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Adam Wallace – Sustainability Adviser
E-mail:  adam.wallace@southlanarkshire.gov.uk
32

Page 33

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Delivering and Enabling Commercial Space -
Programme of Activity 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee on the Glasgow City Region Delivering and Enabling
Commercial Space Programme
 update the Committee on South Lanarkshire’s submissions to the Programme,
amount awarded from the Programme and next steps
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s identified Priority Projects, as set out in Table 1, be taken
forward, along with any actions required, to ensure the delivery of the investment
within the timescales and other criteria set out in the Programme.
[1recs]
3. Background
3.1. In February 2024, the Glasgow City Region (GCR) Cabinet agreed that an allocation
of £64.57m from the City Deal Infrastructure Fund, previously allocated for
improvements in connectivity to Glasgow Airport, should be allocated towards a new,
regional project of significant scale, allowing the City Deal to support new opportunities
and priorities which have emerged since the initial Programme was developed in
2013/2014. 
3.2. The GCR Cabinet also agreed that, as required by the City Deal Assurance
Framework, the Programme Prioritisation Framework (PPF) process be used to
identify the new regional project, with the identification of projects coming through an
Expression of Interest (EOI) process open to all Member Authorities (MAs). This
process was to be carried out over a 12-week period from February to May 2024 but
was subsequently extended to September 2024 due to the General Election.  
6
33

Page 34

3.3. At the conclusion of the process, the “Enabling Commercial Space Programme” EOI
had ranked highest based on: 
 deliverability and financial risk being spread across eight local authorities, rather
than concentrated on one Member Authority
 the proposal addressing a Region-wide, significant need for commercial space
 delivering Region-wide Inclusive Growth with all MAs benefiting from investment
to deliver commercial space, thereby reducing potential displacement effects from
concentrating investment in one area of the Region 
4. The Enabling Commercial Space Programme
4.1. Throughout GCR, it has been identified that commercial and industrial stock is at or
approaching obsolescence. This market failure requires intervention if the Regional
Economic Strategy’s challenges are to be addressed. The delivery of new and
refurbishment of existing commercial space will contribute towards meeting current
demand for new industrial space within GCR, where there is a strong body of evidence
of structural challenges and market failure within the commercial property market.
Enterprise and Sustainable Development Services has reported this previously at a
local level through the Employment Land and Property Market Analysis Report
presented to Community and Enterprise Resources Committee in November 2024 and
subsequently to all four Area Committees. 
4.2. The main investment objectives of the Enabling Commercial Space Programme are: 
 to address market failure in areas of GCR where there are particular barriers in the
development of new or refurbished commercial and industrial floorspace
 to create flexible business space capable of meeting business requirements for a
broad range of sectors
 to create serviced industrial land and capable of immediate development
 to create opportunities for employment and inclusive growth with particular
emphasis on making connections to local communities, schools and colleges in
preparation for employment, particularly in areas of deprivation and targeting
people drawn from disadvantaged or Protected Characteristic groups including
women and young people
 bringing sites on the Vacant and Derelict Land Register back into use
 to attract mobile and private sector investment both from abroad and from
indigenous companies
 to create a sustainable, high quality business locations to support SMEs, supply
chain businesses, start-ups 
4.3. The proposal is to establish a programme of funding to support direct delivery of new,
commercial space and through enabling land, new build construction, and the
refurbishment of existing stock. The interventions will be targeted to address instances
of market failure in the worst performing areas of GCR. 
4.4. The programme will allow MAs to utilise funds to address market failure directly, create
new commercial space for lease or enable development of commercial stock through
remediating and/or servicing of sites. This programme seeks to address a gap in the
currently available public sector funding and will focus on support for businesses more
likely to be within the foundational economy.  
34

Page 35

4.5. The programme will meet local demand, such as for general commercial space to
relieve pressures on constrained local markets and may offer particular benefit to SME
businesses and startups that will struggle to fund being sited in appropriate
commercial space, and potentially businesses supporting wider supply chains and
other high value commercial uses. 
5. Progress to Date
5.1. The first steps undertaken by all MAs was to identify a long list of projects that meet
the criteria of the Programme. Each of these projects was submitted to GCR as an
expression of interest in September 2024. This long list allowed the Strategic Business
Case to be developed and was approved by the GCR Cabinet in February 2025. 
5.2. In South Lanarkshire’s case, an extensive piece of work was undertaken to identify
appropriate projects that maximise the economic outputs within the area and have the
potential to lever in further investment from partners. These projects support the
findings of the Ryden Property Analysis Report previously reported to Community and
Enterprise Resources Committee.  The Council’s long list of projects as submitted in
September 2024 is set out in Appendix 1.   
5.3. Approval has now been given by the GCR Cabinet to move forward, and as a result
of that process, the Council was allocated £11,075,919 from the overall programme.
The allocation is to be supported by a further assessment process, as set out in section
six below, and individual Full Business Cases (FBCs) to be approved in due course
by both the Council and the GCR cabinet. 
6. Next Steps 
6.1. The allocation to the Council, although significant, is not sufficient to deliver all the
projects listed in Appendix 1. The GCR PMO supplied a Shortlisting Framework to
allow MAs to undertake a rigorous assessment for each project in order that each MA
can identify a priority list of project(s).  Each project has been assessed taking into
consideration changes in circumstances, other commercial factors, leverage
opportunities, deliverability and outputs.  Executive Committee approval is sought for
the priority-listed projects which will then become the project programme where
delivery must be achieved by 2030. 
6.2. Due to an external grant award, the Priority Projects now includes a new project,
Industrial Unit Upgrade and Retrofit, not submitted at the time of the Long Listing
process. This has been made possible due to a Regeneration Capital Grand Fund
(RCGF) award received by the Council on 28 April 2025 of £963,000 to support
Cathcart Road, thereby releasing monies for additional activity.  The proposed Priority
Projects are set out below, with further details provided in Section 7. 
Table 1
Location Est. Total
Investment
Proposed
GCR
Allocation 
Outputs  Additionality
Delivery and
Ownership
Cathcart
Road,
Rutherglen
£2,075,919 £1,112,919  620 sq.m new
commercial
space.
17 jobs
Existing South
Lanarkshire Council
(SLC) site brought
back into commercial
activity. Leverage of
£963,000 RCGF to
deliver project
Delivery will be
via the Council
and will become
part of the
commercial
property portfolio.
Red Tree
Labs,
Shawfield
£17,400,000 £9,000,000 3,700 sq.m
offices, lab
space,
Leverage of
£7,600,000
Clyde Gateway
URC
35

Page 36

Innovation
Campus
(MBP)
incubator and
serviced
production
areas.
244 jobs
dependent on
final occupiers 
to deliver
development. 
Funding package
(subject to relevant
formal approvals by
each partner)-
Clyde Gateway- £2.4m
SE -  £6.0m
GCR -  £9.0m 
Industrial
Unit Upgrade
and Retofit
£963,000 £963,000 South
Lanarkshire
Council owned
industrial
unit(s)
upgraded and
brought back
into economic
use. 
Existing SLC property
brought back into
commercial use
supporting the South
Lanarkshire economy.
Properties invested in
will have previously
been vacant or not
contributing to the
commercial vitality of
the area. 
Delivery will be
via the Council
and properties
will become part
of commercial
property portfolio 
6.3. The Industrial Unit Upgrade and Retrofit Project will require to be approved by GCR
via the standard change control process. Officers understand that the project is eligible
and the steps to identify the specific property(ies) to invest in and the formal GCR
processes will commence immediately, subject to Executive Committees approval. 
6.4. Projects which have met the minimum scoring criteria will continue to be developed as
far as possible to ensure they are ‘shovel ready’ for any additional GCR funding or
external funding opportunities. We will also look at further new opportunities that
satisfy the requirements of this funding programme. 
7. Priority Projects
7.1. The Cathcart Road Net Zero Industrial Units will create two units totalling 620 sqm and
providing the opportunity to support 13 jobs on completion.  This project responds
directly to the Employment Land and Property Market Analysis undertaken by Ryden
which stated that to address the shortage of good quality industrial stock, the Council
should look to intervene in the market to ensure new supply.  A design team has been
appointed with designs developing towards RIBA Stage 4.  A planning application was
submitted on 28 March 2025 with an anticipated site start in September 2025 and
completion in the spring of 2026. 
7.2. Full funding for the project was requested from the GCR programme during the Long
Listing process, however, as detailed at paragraph 6.2 this project has been
successful in receiving a RCGF award which has enabled officers to bring forward the
new eligible project detailed at paragraph 7.5. 
7.3. The Red Tree Labs project would be the second building on the Shawfield Phase
1/Magenta site and would be highly impactful as a visibly new four storey building
acting as a further catalyst for the regeneration of Shawfield.  A full design team is in
place which has recently concluded the design to RIBA Stage 3.  Planning consent
has already been approved.  RIBA Stage 4 design will be progressed during summer
2025, followed by a contractor tender exercise with a site start targeted by end 2025. 
A 60-week construction programme from December 2025 would allow completion late
Q1 2027.  Clyde Gateway is well placed to deliver the building and has the governance
and procedures to do so as can be demonstrated on the adjacent site where the four
storey £9.2m commercial office Red Tree Magenta has been delivered in addition to
numerous other projects in recent years. 
36

Page 37

7.4. The £17.4m project is subject to a funding package from several partners, all of which
requires formal approvals by each partner.  The indicative funding proposed is Clyde
Gateway £2.4m, Scottish Enterprise £6.0m, GCR (via SLC) £9.0m.  Funding will be
confirmed by partners prior to the submission of the Full Business Case (FBC) for
approval.   
7.5 The Industrial Unit Upgrade and Retrofit project will address the shortage of good
quality industrial stock available to the market. Council owned commercial stock that
is unattractive to prospective tenants, vacant and not contributing fully to its economic
potential will be the focus of this intervention. Improvements will include upgraded
cladding, efficient heating and ventilation systems and net zero interventions. An
energy efficiency grading of B will be aspired to.  The core funding package is GCR
(SLC) £0.963m. Further funding sources will continue to be investigated to support,
enhance and expand this project. 
7.6. Due to the ability to deliver the projects by 2030 and the leverage of additional funding,
it is therefore recommended that Cathcart Road, Red Tree Labs and the Industrial Unit
Upgrade and Retrofit projects be identified as the Council’s Priority Projects and be
submitted to GCR for approval.  The projects will then move to FBC and be subject to
future Council and GCR approvals. It is intended that projects shortlisted to proceed
to FBC will be developed with the award of grant funds to the local authority (or ALEO)
to build and retain the capital assets developed in public sector ownership, with
property leased on completion to private sector operators to ensure state subsidy
compliance. 
8. Employee Implications
8.1. The Cathcart Road and Industrial Unit Upgrade and Retrofit projects will be delivered
by officers from the Enterprise and Sustainable Development Service within
Community and Enterprise Resources. The Red Tree Labs project will be delivered by
Clyde Gateway supported and monitored by Council officers.   
9. Financial Implications
9.1. The costs for the Council in developing its projects will be met by the GCR programme,
and up to 6% of the project costs are available for further project development and
FBC preparation. Other external funding sources will continue to be investigated to
further support and enhance the programme. 
10. Climate Change, Sustainability and Environmental Implications
10.1. The Report was prepared having regard to the existing and emerging best practice
around climate change and sustainability. It is intended to complement and comply
with the Council’s and wider communities’ aspirations in the area. 
11. Other Implications
11.1. Not identifying priority projects that can be delivered by 2030 risks the loss of this
additional GCR investment.  The performance of this sector has a significant impact
on the local economy and employment opportunities. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Integrated Impact
Assessment is required. 
37

Page 38

12.2. Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in
employment land and property within South Lanarkshire. This consultation and co-
operation will continue throughout the duration of the initiative. 
David Booth
Executive Director (Community and Enterprise Resources) 
8 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 2025/2026 Capital programme Update - South Lanarkshire Council, 26th February
2025
 Employment Land and Property Market Analysis Report – Community and Enterprise
Committee, 26 November 2024 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
John Archibald, Project Development Officer
Enterprise and Sustainable Development Services
E-mail: john.archibald@southlanarkshire.gov.uk
38

Page 39

Appendix 1 – Long List of Projects 
Location Total Investment Bid to GCR Deliverables Potential GCR
Outputs
Langlands £5,903,080 £5,836,000 1,700sq.m
commercial space
New commercial
space
47 jobs
35,000sq.m
serviced
development sites
Once sites created
potential for a future
9,000 sq.m
business space
Cathcart
Road
£2,075,919 £1,911,752 620 sq.m
commercial space
New commercial
space 17 jobs
Caldwellside £4,323,140  £4,323,140  1,200 sq.m
Commercial space
New commercial
space 
33 jobs
5,400 sq.m Site
Servicing 
Potential for future
business space
Technology
hub
Magenta
business
park
£5,500,000 £4,235,000 1,900 sq.m high
value manufacturing
industrial space
Mixed use small
business 
46 jobs
Red tree
labs,
Shawfield
Innovation
campus
(mbp)
£17,400,000 £13,398,000 3,700 sq.m offices,
lab space, incubator
and serviced
production areas
Research & dev
space 
244 jobs
Shawfield
innovation
#2.0
£10,000,000  £7,700,000 4,645 sq.m
advanced
manufacturing unit
for innovative
production
technologies
Business space
96 jobs
Canderside £24,158,000  £24,158,000 10,000 sq.m phase
1 of 30,000 sq.m.
Distribution space
Distribution space
105 jobs
Clydebridge £35,125,000  £4,150,000 Site investigations
and site studies 
Site investigations
and site studies 0
jobs
National distribution
space 
158 jobs if
construction
delivered 
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council Workforce Strategy and Plan 2025 to 2027 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide the Executive Committee with an update on the Council Workforce
Strategy and the Council and Resource Workforce Plans 
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted;
(2) that the Council Workforce Strategy and Workforce Plan be approved; and
(3) that the update on Resource Workforce Plans be noted. 
3. Background
3.1 The Council Workforce Strategy and Planning process provides the framework for
workforce planning in the Council. The Strategy and Plans are aligned to current and
future Council service needs and details the approach by the Council to ensure that
the workforce required is in place to meet those needs. 
3.2. In June 2024, Audit Scotland published the Best Value Thematic work in South
Lanarkshire and the key actions identified were:- 
 to produce an updated Workforce Strategy with accompanying workforce
plans by March 2025
 that the revisions should reflect alignments to the Council Plan and links to
key Council initiatives and strategies, including Digital Transformation and
Inclusion 
3.3. Work has been ongoing since October 2024 and HR Business Managers have
worked with Resources and the output has been:- 
 production and analysis of comprehensive workforce data reports for
Resources and the Council to understand the current workforce information  
7
41

Page 42

 use of the workforce planning toolkit to assess supply and demand against what
is in place, identify any gaps. Key challenges, objectives, and actions are then
developed to address the workforce gaps. Any risks that emerged were also
considered
 the Resource actions have been collated to produce a Council Workforce Plan
and related Resource plans 
4. Council Workforce Strategy
4.1 The Council Workforce Strategy (attached at Appendix 1) outlines the workforce
planning arrangements to enable the Council to have the required workforce in place
to deliver the Council vision over the lifecycle of the plan. 
4.2 The Workforce Strategy has been created to reflect the recommendations from the
Audit Scotland - Best Value thematic work in February 2024 and is now aligned to
the Council planning process in terms of a revised lifecycle of 2025 to 2027. The
Strategy also has direct links with other key Council strategies to ensure these are
considered as part of the workforce planning process. 
4.3 The Strategy provides the national context in terms of key drivers of local government
workforce challenges, in addition to local challenges and gaps in terms of workforce.
The Strategy objectives and outcomes enable the delivery of effective workforce
planning to ensure the right workforce is in place to support the delivery of the Council
vision.
4.4. Across the Council, recruitment challenges and absence levels continue to impact
on workforce availability and service delivery. The workforce planning process will
identify specific actions in relation to this covering the following:- 
 strategic approach to the Council’s overall vison for Maximising Attendance
 a Recruitment Strategy to ensure the tools are available to provide suitable
candidates and enhance workforce supply
4.5. The Recruitment Strategy will ensure that the tools are made available to enhance
candidate experience, as well as setting challenging performance targets and
standards. This will make sure that the Council can attract the required workforce
supply to enhance service delivery. 
4.6. The strategic review of Maximising Attendance will clarify the vison for the Council’s
approach to reducing absence, supporting employees and underpins to the Council. 
4.7. The Council Workforce Strategy details the key workforce planning themes that the
Council will progress during 2025 to 2027, and which are reflected in the Council
Workforce Plan. (attached at Appendix 2).  
42

Page 43

5. Resource Workforce Plans
5.1 Engagement and consultation to produce workforce plans has been primarily through
HR Business Managers and Resource Management Teams. Resources undertook
a horizon scanning exercise as part of the Resource planning process to identify key
areas of focus.  This, along with workforce data was used to complete workforce
planning toolkit templates. In addition, there was review of previous actions (2022 to
2025) to identify any ongoing activity to be reflected in the 2025 to 2027 plans. 
5.2 Resource workforce plans detail the key areas of focus for Resources for 2025 to
2027, the current resource workforce profiles, the key workforce challenges and
actions identified to address challenges. 
5.3 Key actions from Resource workforce plans are provided below:- 
 Community and Enterprise – the challenges faced by the Resource are that
there are difficulties in attracting and retaining employees. This is addressed
through recruitment initiatives as well as internal development opportunities.
For example, work is ongoing with the further education sector on course
availability for professional posts to improve future workforce availability.
 Education - workforce planning consideration needs to take account of the
needs of a changing education landscape, including education reform, the
national improvement framework and national reviews. In addition, should class
contact time reduction be introduced, the number of teachers will have to
increase significantly. There is also a requirement to upskill the workforce and
support digital transformation.
 Finance and Corporate – in the Resource there are continued service
improvements relating to Digital Transformation, for example, the
implementation of Oracle Fusion. There are challenges relating to the age
profile of the workforce and recruitment and retention in professional posts –
finance, procurement, legal and IT means potential for loss of skills and
experience and difficulty with replacement. These challenges are addressed
through succession planning and progression of existing staff and wider
advertising strategies.
 Housing and Technical Resources – the recruitment and retention of
employees in a competitive market and maintaining operations during a
homelessness crisis is difficult. Action to promote good practice and the Council
forward. 
 Social Work – Within Social Work, the main challenges relate to recruitment
and retention of professionally qualified staff and maintaining safe staffing
levels. The actions include further development and promotion of career
pathways into social care through initiatives such as the Care Academy.
 Recruitment to more rural areas within the South Lanarkshire area is difficult.
5.4 Resource Plans will be remitted to Resource Committees for approval in August and
September 2025.  
43

Page 44

6. The Council Workforce Plan
The output from Resource Workforce Plans has been used to produce the overall
Council Workforce plan, which includes the Council workforce profile, high level
challenges and actions to address these challenges. A number of common
challenges have emerged from Resource workforce plans, and these require to be
reflected in the Council wide workforce plan. That plan provides an overview of key
challenges which are detailed below:- 
 recruitment attraction and retention
 transformation activity
 skills gaps
 delivery of key Council strategies such as Digital Transformation/Inclusion
and climate change
 employee health and wellbeing
The associated actions to address these areas include:
 revised recruitment practices  a new Recruitment Strategy is being developed for
the Council which will embed revised practices, for example looking at different
ways of attracting staff such as recruitment fairs, alternative places to advertise,
and using social media where appropriate, to address workforce supply issues
 development of ‘grow our own’ approach to attract and retain employees – this
will increase retention with internal career pathways across the Council and
will be supported by the new Learning and Development Strategy being
developed
 robust succession planning practices – introduction of a process to develop
future leaders and mitigate the loss of skills and experience across senior
leadership teams. The management and leadership development programme
is being refreshed
 manage employee impact of ongoing requirements for efficiency savings
and service redesign and transformation – progress actions from
transformational reviews and support change management across the
Council
 support and development for delivery of key Council strategies –
development of teams and individuals to deliver the Digital Strategy and
Climate and Sustainability Strategy, this is in addition to activities to support
delivery of resource plans
 maintain employee health and well-being – continued review and
improvement of Maximising Attendance Policy to ensure sufficient and
appropriate supports are available to employees to help them maintain their
well-being and resilience 
The full Council Workforce Plan is attached as Appendix 2.
6.2. Plans will be monitored through Resource Management teams and updates
provided to committee on an annual basis.  
44

Page 45

7. Employee Implications
7.1. Having a Workforce Strategy and proactive workforce planning process in
place ensures an effective workforce is in place to deliver Council services.
8. Financial Implications
8.1. There are no costs associated with undertaking the workforce planning process.
8.2. Planning for appropriate workforce arrangements demonstrates effective
and efficient use of resources. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or for the
environment on this report. 
10. Other Implications
10.1. There are risks to the Council in not ensuring that there are clear links between the
workforce planning process and the overall Council planning process. 
11. Integrated Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy or strategy, and no impact assessments
are required at this time. When the Workforce Strategy has been finalised
consideration of impact assessment requirements will take place at that time. 
11.2. Trade Unions have been involved in the draft of the plan and updated through
updates to JTUC Executive. Resource workforce planning activity will be reported
through Joint Consultative Committees. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
2 May 2025 
Links to Council Values/Priorities/Outcomes
Values
Focused on people and their needs
Working with and respecting others
Accountable, effective, efficient, and transparent
Ambitious, self-aware, and improving
Fair, open, and sustainable
Excellent employer
Priorities
We will work to put people first and reduce inequality
We will work towards a sustainable future in sustainable places
We will work to recover, progress, and improve  
45

Page 46

Outcomes
Thriving business, fair jobs and vibrant town centres
Caring, connected, sustainable communities
Inspiring learners, transforming learning, strengthening partnerships 
Previous References
None 
List of Background Papers
 Scotland’s Local Government Workforce Report 2024
 Audit Scotland – Best Value thematic work in South Lanarkshire Council 2023-24 
Contact for Further Information
If you would like further information, please contact: -
Michelle Milne, Head of Personnel Services
Ext: 4330 (Tel: 01698 454330)
E-mail: michelle.milne@southlanarkshire.gov.uk
46

Page 47

1 
Appendix 1
47

Page 48

Contents 
1. Introduction Page 3
2. Council Overview Page 4
3. Council Strategic and Operational Context page 6
4. National and Legislative Drivers Page 6
5. Council Workforce Challenges Page 7
6. Engagement and Consultation Page 9
7. Workforce Data Page 9
8. Workforce Strategy Objectives Page 9
9. Key Workforce Planning Themes Page 10
10. Key Responsibilities Page 15
11. Monitoring the Strategy and Workforce Plans Page 16
12. References Page 16
48

Page 49

1. Introduction
The previous Workforce Strategy from 2016 provided the framework for the
workforce planning process across the Council. This has been reviewed and
updated to align the current and future Council service needs with the
workforce needed to meet those needs. The updated Strategy also
incorporates the recommendations from Workforce Innovation – How Councils
are Responding to Challenges, Best Value Thematic Work in South
Lanarkshire Council, Audit Scotland June 2024. Steps have also been taken to
better align the workforce planning process with the Council Plan and other key
Council strategies and activities. 
The Workforce Strategy will ensure the Council has effective workforce
planning arrangements to achieve the right number of people, with the right
skills, in the right place, at the right time to support, maintain and develop the
provision of high quality, responsive services.
The purpose of the Strategy is to clearly set out the Councils Strategic
Workforce position and the steps that will be taken to enable the production of
comprehensive Resource Workforce Plans and an overarching Council
Workforce Plan to cover the period 2025 – 27. 
South Lanarkshire Council along with other Scottish Councils is operating in a
very difficult economic, financial and labour market context, with a range of
ongoing organisational pressures. One key area of challenge is how local
government is managing its known and emerging workforce planning and
capacity issues, given the significant range of services it has to deliver, many of
which are statutory and critical to supporting local communities every day. 
There are also other workforce challenges, which are known through the
Councils own experience and its involvement in national discussions and
working groups on workforce planning. These challenges include: 
• Shifts in labour market workforce availability
• Recruitment difficulties due to skills and talent shortages
• Wage inflation and associated pay erosion in professional roles across a
range of services
• Roles that are difficult or slower to fill or that can remain unfilled for
periods of time
These workforce challenges are happening at a time when demands on the
Council are increasing across many services. These additional workforce
capacity issues have compounded and increased the scale of challenges which
need to be monitored more closely and addressed to ensure the longer-term
sustainability of the council service provision and meeting community needs. 
Digital transformation has been happening in local government for some time
and covers a broad spectrum of activity. However, the agenda for digital
transformation inclusion, whilst expanding and offering opportunities to
enhance service delivery, boost efficiency and engage with the community and
service users more effectively, also brings challenges. There are changing
49

Page 50

expectations around when and how customers and service users access
services, therefore, more flexibility is required around how the Council delivers
services. The Council Workforce Planning process will ensure Workforce Plans
are aligned to the Council Digital Transformation and Inclusion approach to
implement technology where it is beneficial, improve processes and
productivity and ensure capability and capacity is maximised. 
South Lanarkshire Council is working to anticipate future digital trends, service
user and community needs, the skills, expertise, and experiences required in
the workforce and new ways of working that will impact on the workforce and
service delivery. 
The Workforce Strategy provides the framework to identify the actions and
activity to address workforce challenges.
The Strategy builds on the work carried out through the previous workforce plans
and supports the workforce to deliver services to the community now and in the
future. 
The key themes of the workforce strategy will ensure the Council have the right
people in the right place at the right time to deliver the Council plan. 
The Workforce Strategy is strategically aligned to the Council Plan timelines
and sets out how the Council will take action to ensure the workforce is
available to support the delivery of the Councils vision within the available
financial resources. 
2. Council Overview – Who we are and what we do
The Council delivers a wide range of services that touch all communities and
every household in South Lanarkshire. South Lanarkshire is a diverse and
dynamic area covering 1,772 square kilometres of varied geographical territory,
80% of which is in agricultural use, they are made up of rural and urban areas,
with 3 out of 4 people in South Lanarkshire living in an urban area. 
South Lanarkshire is the fifth largest council area in Scotland with a population
of 320,000 a working age population of 203,000 and around 145,000
households who live in the suburban towns, rural towns, and villages.
The council employ in the region of 17,086 employees (14,046 FTE) across 5
Resources. Each of the following 5 resources is tasked with delivering the key
priority objectives of the Council: 
• Community and Enterprise Resources
• Education Resources
• Finance and Corporate Resources
• Housing and Technical Services Resources
• Social Work Resources
At the heart of the council’s vision are our values based on fairness, empathy,
and commitment to make a difference to the lives of all our citizens and
50

Page 51

communities. Our values express our determination to be ambitious for South
Lanarkshire and to be a high performing and high achieving council who is fully
committed to building a strong future workforce to support the delivery of
service to our communities who need them most. South Lanarkshire Council’s
Plan, Connect, explains how the council will achieve this across all five
resources. 
In terms of service provision, the Council Resource plans include key areas of
focus, Resource outcomes, measures, actions, and details how the plan will be
resourced. 
The Council Connect Plan sets out the vision, key priorities, and objectives for
the council. The individual resources and service plans reflect these key priorities
and demonstrate the Council’s continuous commitment to improving and
developing its performance and measuring outcomes. 
51

Page 52

3. The Council Strategic and Operational Context
The Council and Resource Plans provide the context to determining what affects
the future shape of the workforce, the skills set of the current workforce and what
skills set will be needed in the future.
Connect – The Council Plan
Connect, the Council Plan 2022-2027 was approved at the full Council meeting
on 15 June 2022 and details the council vision, values and priorities and
expresses its determination to be ambitious for South Lanarkshire and to be a
high-achieving and high-performing council. These are summarised below: 
Council Vision
Our shared vision is to improve the lives and prospects of everyone in South
Lanarkshire
Council Values
• Focused on people and their needs
• Working with and respecting others
• Accountable, effective, efficient, and transparent
• Ambitious, self-aware, and improving
• Fair, open and sustainable
• Excellent employer 
Council Priorities
People – we need to put people first and reduce inequality
Progress – we need to recover, progress and improve
Planet – we need to work towards a sustainable future in sustainable places 
4. National Issues and Legislative Drivers
As part of the workforce planning process, external pressures have been
considered in terms of national policy and legislative changes in the context of
how they will impact on the workforce. A horizon scanning exercise has taken
place to understand the challenges that could influence the direction of the
Council. This has highlighted the following areas for consideration. 
There are workforce issues for Local Government that require national actions.
A number of key drivers of local government workforce challenges (from
Scotland’s Local Government Workforce Report 2024) have been identified:
52

Page 53

⬧ Skills Shortages – there is a shortage of skilled and qualified professionals
across a range of disciplines
⬧ Budgetary Pressures – ring fenced budgets and flat cash grant awards and
continued pressure to make savings directly impacts on workforce capacity
⬧ Ageing Workforce Profile – the council has an ageing workforce profile in key
service areas
⬧ Skills Funding – there are not enough workforce skills funding sources and
supports to enable capacity building.
⬧ Next Generation Workforce – there is a need to attract a new generation of
employees to local government
⬧ Recruitment Challenges – pay competitiveness and workforce availability in
rural areas as well as having the right skills and experiences present significant
challenges 
The Council, through national networks such as, Solace, Society of Personnel
and Development (SPDS), Association of Directors of Education Scotland
(ADES), the Improvement Service and CoSLA, will keep abreast of national
initiatives and developments and reflect these in our workforce plan. 
5. Council Workforce Challenges 
The key drivers for workforce challenges detailed in section 4 of the Strategy,
from Scotland’s Local Government Workforce Report 2024 will be considered
alongside the key challenges emerging from the Council Workforce Planning
Process and will be detailed in the Council and Resource Plans. 
Across the Council recruitment challenges and absence levels continue to
impact on workforce availability and service delivery. The workforce planning
process will identify specific actions in relation to this covering the following:
53

Page 54

• Strategic approach to the Council’s overall vison for Maximising
Attendance
• A Recruitment Strategy to ensure the tools are available to provide
suitable candidates and enhance workforce supply.
In addition, consideration will be given to other related key council strategies
and activities that will impact on the workforce planning process, the key areas
have been detailed below: 
Financial Resources
The Council continues to deliver services with reduced financial resources.
There is a program of transformational reviews that support the Councils
Financial Strategy. Workforce implications will be managed through the
Council’s policy of engagement and redeployment. 
Digital Transformation and Inclusion
The Council’s Digital Strategy is targeted at improving the effectiveness and
efficiency of South Lanarkshire Council services through its use of digital and
ICT services and going forward the benefits of artificial intelligence. This
strategy requires a digitally skilled workforce aligned to Council needs, is also
aiming to increase digital inclusion and this also includes the council workforce
to enable them to be equipped to operate in a digital age. 
Mainstreaming Equalities
The Council is committed to reducing inequality in its communities and this will
be reflected in its workforce activities. This is evidenced by the Council’s
Mainstreaming Equalities Reports 2019-2021 and 2021-2025, which highlights
the Councils progress against the Equality Outcomes set in 2017 and includes
details of the diversity of our workforce, the gender pay analysis and also
outlines the equality outcomes that have been set for 2021-2025. 
Sustainable Development and Climate Change
The Sustainable Development and Climate Change strategy aims to build a
sustainable, climate resilient South Lanarkshire and it has themes on People,
Place, Planet and progress which are aligned to the Council plan. To deliver
the plan the workforce requires to be climate aware and equipped with green
skills. 
Succession Planning, Leadership and the Councils approach to Learning and
Development
The Council is committed to continuous development of the workforce through
leadership development, succession planning and learning opportunities for all
employees. 
Employee Health and Wellbeing
The Council is an advocate for employee health and wellbeing and continues to
ensure employees feel supported at work and can maximise their wellbeing
through the range of activities provided through employee assistance (EAP)
program and beyond.
54

Page 55

Workforce Monitoring
The Council regularly monitors and reports on key workforce matters to
Committees, the Corporate and Resource Management Teams, trade union
and other council forums, this will include key workforce data, absence and
recruitment information, equalities data, health and safety statistics and
overtime. Workforce data is used to monitor the progress of workforce planning
actions. 
6. Engagement and Consultation
In developing the Council’s Workforce Strategy 2025–27, engagement and
consultation have taken place through the Corporate and Resource Management
Teams and Trade Unions. 
7. Workforce Data
Workforce data provides a baseline profile of the workforce. This details a
position on the make-up of the workforce and informs the development of the
workforce plans.
This data has been used to consider: 
• Demographic range across occupational groups
• Occupational gaps
• Diversity
• Reasons for leaving
• Absence trends
• Vacancy levels and turnover
Consideration of data allows gaps and workforce projections to be identified
and allows the development of workforce action plans. 
8. Workforce Strategy Objectives
The strategy will deliver the following objectives:
• Improve and mature the workforce planning process for the Council
• Deliver an efficient workforce that is diverse and resilient with a broader range
of skills capable of delivering the Council Connect Plan and the priorities
People, Progress, Planet.
• Enable the Council to deliver key strategies, services and activities
• Protect and maintain the physical and mental health of employees
55

Page 56

9. Key Workforce Planning Themes
Key activities across themes will ensure the delivery of the strategy objectives
through the production of robust workforce plans. These themes and
associated activities are focussed on the following areas:
• Build workforce capacity through the council and resource planning
process and workforce data analysis (stage 1 and 2 of the workforce
toolkit)
• Attract, Recruit and Retain a Council Workforce
• Provide an Inclusive and Diverse Workforce
• Delivery of key council strategies such as Digital and Sustainable
Development and Climate Change
• Support employee Health and Wellbeing policy and initiatives 
How these key themes will be progressed to deliver the strategy objectives are
detailed in Table 1.
56

Page 57

Table 1 - Key Workforce Planning Themes
Key Theme Current Position Improvement Action Who Timescales
Building workforce
capacity
The Workforce planning
toolkit is used to assess
what future changes will
impact on the workforce,
what the current workforce
data is reflecting in terms of
supply and demand against
what is in place. This
identifies any gaps.
Objectives and Actions are
then developed, risks are
considered, and Workforce
Plans are created.
Resources produced these
on a 3 yearly basis,
covering 2022 - 25.
Provide a Workforce
Strategy with clearer links to
the Connect Council Plan
2022-27. 
Build on the workforce
planning activity to date. 
Implement a more strategic,
data driven, approach to
workforce planning, with
smarter action plans, setting
out how the Council level
and service level actions are
being progressed.
Head of Personnel Complete
Standard workforce data,
used as part of the
workforce monitoring
reports to produce
workforce plans
Incorporate the analysis of
more comprehensive
workforce data into the
workforce planning process
HR Business
Managers
Complete
Attraction, Recruitment,
and Retention
The Recruitment Charter
outlines the Council’s
commitment to applicants
that we will provide the best
possible recruitment service
Produce an Attraction,
Recruitment and Retention
strategy which will provide a
workforce able to deliver the
Council vision, support the
Head of Personnel December 2025
57

Page 58

and will remove any barriers
to equality of opportunity at
all stages of the recruitment
process.
supply, and demand
challenges faced by the
Council.  
The Strategic Learning &
Development Plan is linked
to the Council Connect plan
and ensures that all key
learning and development
activities undertaken by
employees help us as a
council to achieve our
objectives. 
This process also allows
learning, and development
needs to be established to
support our employees to
carrying out their duties.
Produce a Strategic
Learning and Development
Plan that supports current
and future service
requirements and workforce
planning.
Head of Personnel December 2025
Performance appraisal is a
structured process for our
employees and their
manager to discuss and
agree key work objectives
relevant to service delivery.
This is also used for
succession planning
Develop and implement a
specific and robust
succession planning
processes.
Head of Personnel December 2025
58

Page 59

purposes through career
development discussion.    
Inclusive and diverse
workforce
The Equality and Diversity
policy supports the Council's
commitment to deliver
services that meet the needs
of everyone who lives and
works in South Lanarkshire.
Review mainstreaming
equalities recommendations
and outcomes to make
improvements in recruitment
practices to be more
inclusive
Head of Personnel December 2025
Recruitment equalities
monitoring is part of the
Council’s workforce
monitoring.
Develop with digital
improved reporting and data
capture to enable better
monitoring of recruitment
processes for minority
groups and how this will
impact on workforce
planning actions
Head of Personnel December 2025
Delivery of key Council
Strategies
Digital Transformation and
Inclusion
Use the workforce planning
process to ensure there is a
skilled and available
workforce to deliver
Services and is aligned to
the Digital Strategy
Head of IT / Head of
Personnel
March 2025
59

Page 60

Sustainable Development
and Climate change
strategy sets out the vison
to build a sustainable,
climate resilient and net
zero South Lanarkshire
Use the workforce planning
process to identify how to
ensure there is a skilled and
available workforce to
deliver the Sustainable
Development and Climate
Strategy
Head of IT / Head of
Personnel
March 2025
Health and Wellbeing The Council’s Employee
Wellbeing Plan helps
achieve the Service,
Resource and Council Plans
by supporting employees to
be at their best, be
energised, motivated and
resilient.
Strategic review of
Maximising Attendance
Policy and supporting
procedures to ensure that
the Council continues to
develop good practice to
support and engage the
workforce
Head of Personnel December 2025  
Annual review of employee
wellbeing initiatives and
campaigns to provide to
improved supports and
increase resilience of
employees  
60

Page 61

10. Key Responsibilities to Produce Workforce Plans 
Corporate Management Team
• Provide leadership and vison to support the workforce planning
process
Executive Directors and Heads of Service
• To participate in the workforce planning process working collaboratively
with HR Business managers, service managers and employees
• Using the workforce planning framework produce Resource Workforce
Plans
• Monitor action plans through Resource Management Teams and
reports to Resource Committees
• Respond to any significant changes within the lifecycle of the plan and
adjust actions as required
Personnel Services
• Provide workforce data and analysis to support the workforce planning
process
• Facilitate the workforce planning process, supporting Resources to
access workforce planning toolkits and produce workforce action plans.
• Keepers of documentation related to workforce planning process
• Review Workforce Strategy in line with the Council planning process
• Provide support and guidance to Executive Directors, Managers and
employees on al aspects of workforce planning. 
11. Monitoring the Strategy and Workforce Plans
The strategy is aligned to the Council Planning cycle and will be reviewed in
line with any revisions to the Council Plan. The current Council Plan is due to
be refreshed in 2027. 
Workforce Plans will be produced for the period 2025 – 27. When plans are
initially produced, they are reported to Committee for approval. Workforce plan
updates will be provided to Committee on an annual basis to monitor the
progress of actions and report any adjustments to the plans if required.
61

Page 62

12. References
Council Strategies
Connect Council Plan 2022 – 27
Connect Council Plan 2022-27 (PDF) Plans and policies - South Lanarkshire
Council 
Budget Strategy
Budget Strategy 2025/26 and 2026/27
Digital Strategy
Digital Strategy 2022-2027 Plans and policies - South Lanarkshire Council
Sustainable Development and Climate Change Strategy
Introduction - South Lanarkshire Council
Resource Plans 
f you require this information in another format, please email
equalities@southlanarkshire.gov.uk.
62

Page 63

South Lanarkshire Council Workforce Plan 2025 – 27 
Appendix 2
63

Page 64

South Lanarkshire Council Workforce Plan 2025 – 27 
South Lanarkshire Council
Workforce Plan
2025 – 27 
1. Introduction
2. Key Workforce Planning Activity
3. Workforce Profile
4. Workforce Challenges and Actions
5. Risk Implications
6. Monitoring the Plan
Appendix 1 – Review of 2022-25 Actions
Appendix 2 – Summary of Resource Challenges and Actions
Appendix 3 – Council Workforce Profile
Appendix 4 – 2025 – 27 Council Workforce Planning Actions
64

Page 65

South Lanarkshire Council Workforce Plan 2025 – 27 
1. Introduction
South Lanarkshire Council delivers a wide range of services across the community that
improve the lives of everyone living in South Lanarkshire. At the heart of the Council vision
are values based on fairness, empathy, and a commitment to make a difference for the
people of South Lanarkshire. The Council strives to be high achieving and high performing
and to achieve this requires an available, capable, and resilient workforce.
The Council Plan 2022 – 2027 sets out the Council priorities and how these will be delivered.
The foundations of the Council plan are based on People, Planet and Progress.
To deliver the Council priorities the Council has a Workforce Strategy which sets out the
workforce planning framework used to identify the key strategic drivers, service demands
and the actions to ensure that the Council has the right people in the right place at the right
time to deliver our vision.
This framework has been used to produce Resource and Council workforce plans, which
outline the workforce challenges and actions for South Lanarkshire Council.
The previous workforce plans covered 2022 – 2025 and this Council Workforce Plan covers
the period 2025 – 27, to align with the lifecycle of the current Council Plan.
2. Key Workforce Planning Activity
Resource Workforce plans were produced covering the period 2022 – 25. These plans have
been reviewed to provide an update on actions to date and to identify any ongoing activity to
be reflected in the 2025 – 27 plans. A summary of the review is included in Appendix 1.
Resources undertook a horizon scanning exercise as part of the Resource planning process
to identify key areas of focus. Workforce data for the Council and each Resource was used as
a baseline for the current workforce and covered, age profile, absence, turnover, vacancies, and
employment categories.
Key areas of focus for resources and services were identified as part of the resource planning
process, as they considered their requirements as part of the national and legislative context.
These areas of focus were reviewed alongside the workforce data to complete the workforce
planning toolkit templates which were then used by Resources to identify key priorities and
the workforce required to support this. Thereafter any gaps in terms of skills, employee
capacity and challenges were considered and actions required to address these gaps are
included in Resource workforce action plans.
The output from workforce planning activity for each Resource is summarised in the Key
Challenges and actions for each Resources, in Appendix 2.
3. Council Workforce Profile
The full workforce profile is attached in Appendix 3. The data reviewed covers the period
April 2023 – March 2024. Resources used this data to complete their workforce plans for
2025 – 27.
The key highlights from the workforce profile are detailed below.
Employee Numbers
For April 2023 – March 2024, South Lanarkshire Council (SLC) employed an average of
17,086 employees, equating to 14,046 Full Time Equivalent (FTE). This is detailed in table 1.
65

Page 66

South Lanarkshire Council Workforce Plan 2025 – 27 
The workforce is split across five resources, the split of each Resource is shown below in
Table 1 by headcount (number of employees) and total FTE.
Table 1 Employee numbers 
Resource Headcount FTE
SLC 17,086 14,046.3
Community and Enterprise 3452 2626.6
Education 8363 6780.4
Finance and Corporate 906 808.3
Housing and Technical 1445 1340.6
Social Work 2921 2490.4 
Employment Status
As of 31 March 2024, SLC employed 16,740 employees. There are 594 employees who are
in a temporary position,15,377 employees in a permanent position and 769 casual employees.
This is detailed in table 2.
The majority of the Council’s workforce is employed on a full-time basis, the highest proportion
of part time employees is within Community and Enterprise Resources.
Table 2 Employment Status 
Resource Permanent
Employees
Temporary
Employees
Casual
Employees Total Employees
SLC 15377 594 769 16740
Community and Enterprise 3229 86 2 3317
Education 7106 362 719 8187
Finance and Corporate 847 30 4 881
Housing and Technical 1362 79 1 1442
Social Work 2833 37 43 2913 
Gender Split
The gender split across Resources* is detailed in Table 3. The Council workforce consists of
25.8% male and 74.2% female.
Table 3 Gender Split 
Resource Female Male Total Employees
SLC 11846 4125 15971
Community and Enterprise 1794 1521 3315
Education 6442 1026 7468
Finance and Corporate 657 220 877
Housing and Technical 508 933 1441
Social Work 2445 425 2870 
*As at 31 March 2024 and excluding casual employees
66

Page 67

South Lanarkshire Council Workforce Plan 2025 – 27 
Age Range
The age range across Resources* is detailed in Table 4. Sixty-five percent of the workforce
are age 40 or over. Community and Enterprise Resources has the highest employee numbers
aged 65 and above, with Education Resources having the highest number of employees aged
50 and above. Housing and Technical Resources has the highest number of employees aged
16-19 years.
Table 4 Age Range 
Age Range
Resource
16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
SLC 61 1862 3536 3749 4475 1670 618 15971
Community and
Enterprise 15 187 532 678 1075 562 266 3315
Education 12 1127 2044 2021 1705 445 114 7468
Finance and
Corporate 8 62 135 208 352 89 23 877
Housing and
Technical 17 200 276 273 402 186 87 1441
Social Work 9 286 549 569 941 388 128 2870
* As at 31 March 2024, excluding casual employees.
Absence
The absence rate for the Council for 2023/24 was 5.4%. Social Work Resources has the
highest absence rate. The details are in table 5.
Table 5 – Absence rates 
Resource Absence 23 /24
SLC 5.38%
Community and Enterprise 6.23%
Education 4.48%
Finance and Corporate 3.48%
Housing and Technical 5.79%
Social Work 7.23% 
Leavers and Turnover
From 1st April 2023 to 31st March 2024, 1,709 employees left the council, equating to 1239.55
FTE. The turnover rate for the Council for 2023/24 was 10.46%*, this turnover rate is
calculated using all leavers.
Recruitment
During 2023/24 1,931 posts were advertised attracting 15,592 applications. Candidates were
appointed to 1453 posts. The difference can be attributed to the notional number of vacancies
applied to rolling campaigns. This is not a reflection of non-filling of posts.
Full details of the workforce profile are attached in Appendix 1.
67

Page 68

South Lanarkshire Council Workforce Plan 2025 – 27 
4. Council Workforce Plan
When considering the key challenges and actions identified by Resources (Appendix 2)
common workforce challenge and actions have emerged.
Common challenges:
• Recruitment attraction and retention
• Transformation
• Skills gaps
• Delivery of key Council activities such as climate impact and digital transformation
• Maintaining employee health and wellbeing 
To address the challenges, common Council workforce actions are:
• Revised recruitment practices
• Development of ‘grow our own’ approach to attract and retain employees
• Robust succession planning practices
• Manage employee impact of ongoing requirement for efficiency savings and service
redesign
• Support and development for delivery of key Council strategies
• Maintain employee health and well being
The Council Workforce Action Plan is attached in Appendix 4. This provides the detail on the
actions to deliver the plan, how they will be achieved, who is responsible for the delivery, the
expected outcomes, and the timescales to be achieved by.
Engagement and consultation to produce workforce plans has been primarily through HR
Business Managers and Resource Management Teams,
Trade Unions have been updated on activity through JTUC Executive updates and Trade
Unions were also asked to provide details of workforce challenges from TU perspective via a
survey.
5. Risk Implications
The actions identified to assist the Council to achieve the right people with the right skills to
deliver services. However, there are risks if these actions cannot be delivered. These are:
• Reduced workforce supply is a risk to meeting the Councils requirements
• Ability to train and develop staff to create our own talent into specialist roles within
required timescales and maintain service delivery
• Competing recruitment drives across services and sectors
The risks identified with workforce planning will be included in the Resource risk registers.
6. Monitoring the Plan
The action plan will be monitored through Resource Management Teams. As the
arrangements on national initiatives emerge any significant changes will be reflected in
updated action plans. Resource workforce plans will be formally reported through annual
updates on actions to Resource Committees. The Council workforce plan will be reported to
Executive Committee on an annual basis.
68

Page 69

South Lanarkshire Council Workforce Plan 2025 – 27 
Appendix 1 Review Workforce Plan Actions 2022 – 25
An update on the key actions from the 2022 – 25 plan is provided below: 
Priority / identified
need
Actions Achievements Next steps
1a Increased demand and Revised Revised This will be 
reduced workforce pool recruitment recruitment addressed  
practices, utilise practices are now through the  
employability embedded, use of Recruitment  
routes. social media, Strategy and   
employability, and the   
promotion of career Learning and   
pathways. This is Development   
evidence by Strategy   
continued support 
for the Council 
Modern Apprentice 
program, links to 
employability 
programs, 
continued 
development of the 
Lanarkshire Care 
Academy. 
1b  Succession Succession This will be 
Planning planning is addressed  
discussed as part through the  
of appraisal Recruitment  
process and Strategy and  
potential leaders the  
are nominated to Learning and  
join the Leadership Development  
Development Strategy  
program, there are 
currently 25 
delegates enrolled. 
2a Service Design and Managing The Council The revision of 
Efficiency savings employee impact continues to SWITCH2  
of savings manage the arrangements   
employee impact of in relation to   
saving requirement managing   
through SWITCH2, employee   
turnover and impact of   
vacancies. savings activity    
will ensure that    
employee skills    
are maximised.
69

Page 70

South Lanarkshire Council Workforce Plan 2025 – 27 
2b  Service Redesign The Council has a The  
program of transformational  
transformational review  
reviews to enable programme is  
services to be ongoing and  
delivered in a current reviews  
different way to are within  
achieve services areas,  
efficiencies. as well as   
reviews of   
overtime   
reduction and   
organisational   
structures.
3a IT / Digital Implementation of The new system The workforce  
Fusion (HR, was implemented planning  
finance, and in August 2024 and process has  
procurement) processes have matured to   
been improved to provide a   
reflect the specific focus to   
capability of the consider the   
new system. workforce    
supports for the    
delivery of a    
Digital Council
3b  Implementation of Work is ongoing in As the Council 
Resource IT Housing and moves towards 
systems Technical more digital  
Resource to solutions the  
implement the workforce plans  
integrated housing will reflect  
management actions to  
system. ensure that our  
Within Social Work workforce is  
the implementation digitally aware  
of Liquid Logic is and included.  
planned for June 
2025. 
4 Employee support and
wellbeing
Enhance
employee support
Revised
occupational health
provision has
enhanced the
support available to
employees
Employee
supports will
continue to be
reviewed to
ensure the
supports are
accessible to all
employees.    
There is a
strategic
review of
70

Page 71

South Lanarkshire Council Workforce Plan 2025 – 27 
Maximising
Attendance
Policy and
supporting
procedures to
ensure that the
Council
continues to
develop good
practice to
support and
engage the
workforce
71

Page 72

South Lanarkshire Council Workforce Plan 2025 – 27 
Appendix 2 - Summary of Resource Workforce Planning Actions 
Resource Key Challenges Actions identified
Community and Enterprise • Difficult to attract new recruits and retain
employees across front line and professional
services.
• Recruitment challenges around timescales and
checks required to maintain safe recruitment
practices.
• Move from manual to digital platforms for
managers and employees.
• Continued professional development for
employees to keep abreast and trained on
new/specialist legislation/knowledge – lack of in-
house experience to train/develop.
• Management development in key areas such as
finance and procurement
• Aging workforce, risk of losing knowledge,
experience, and skills.
• Maintaining customer expectations in current
financial climate
• The impacts of Climate change on the
transportation network
• Town centre regeneration programmes, lack of
internal skills to support
• Continue to invest in ‘grow your own’ approach
across all service areas.
• Promote the benefits of working for the Council
in recruitment adverts.
• Invest in succession planning, mentoring
programmes, management development and
leadership programmes.
• Invest and increase apprenticeship opportunities
and programmes in difficult to recruit areas.
• Invest in training and upskilling current
workforce to meet service demands, including
specialist training to meet legislation changes.
• Climate change and climate emergency training
to be delivered.
• Invest in project management training.
• Bespoke training package for senior managers
• Focus work with employability and employability
programmes.
• Invest in IT packages and skills training for front
line employees.
Education • Skills and competencies required due to the
demands of a changing educational landscape
for all employees in an education setting.
• National reviews such as the Morgan review and
the Hayward review will place increased focus
on inclusive education.
• Need for leadership skills and competencies in
areas such as change management, strategic
• Implement robust succession planning.
• Enhanced leadership training in areas such as
change management, strategic planning,
collaboration, innovation, ethical decision
making and cultural competence.
• Invest in IT and digital training.
• Promote health and wellbeing initiatives for all
employees.
72

Page 73

South Lanarkshire Council Workforce Plan 2025 – 27 
planning, collaboration, innovation, ethical
decision making and cultural competence.
• Skills gaps in digital literacy
• Skills gaps for challenging environments, culture
competence including human rights training.
• Wellbeing supports for employees.
• Budget constraints and impact on teacher
numbers
• Level of demand in schools relating to
dysregulated behaviour, support for employees
in dealing with these issues.
• Increase in violent incidents in schools and
impact on all employees in an education setting.
• Recrutiment and retention of employees both
teacher and local government.
• Succession planning
• Invest in training and upskilling current
workforce to meet service demands, including
specialist training to meet legislation changes.
• Climate change and climate emergency training
to be delivered.
Finance and Corporate
Resources
• Financial strategy and cost of living crisis
• Community involvement
• Continuing service improvement from Oracle
Fusion
• Age profile of workforce
• Loss of knowledge, skills, and experience
• Professional and specialist posts are hard to
recruit and retain.
• Strategic Digital development and how this is
supported.
• Impact of providing cross council support for
transformation and ability to contribute to
financial savings
• Continue to expand use of ‘grow your own’
approach.
• Implement robust succession planning.
• Leadership development
• Develop skills for existing employees to enable
progression and increase retention.
• Skills development to support strategic IT.
• Transformational skills development
Housing and Technical
Resources
• Recruitment challenges as other provider have
more generous reward packages.
• Age profile of existing staff
• Promote flexible working and benefits of the
Council development of green skills as an
employer of choice.
73

Page 74

South Lanarkshire Council Workforce Plan 2025 – 27 
• Homelessness emergency
• Green energy requirements and skills to support
this.
• Continuing legislative requirements around
MAPPA and supporting asylum
• Implementation of integrated housing
management system
• Training and development to support green
energy and statutory requirements.
• Succession planning
• Development of green skills
• Skills development to support service delivery.
Social Work Resources • Recruitment and retention of qualified social
workers and social work assistants
• Staff demographic
• Provision of service across a large geographic
area
• Regulation and inspection of services
• Maintenance of safe staffing levels
• Service demand pressures.
• Ongoing financial pressure
• Progression of digital and AI enhancements, e.g.
technology enabled care.
• National social care reform
• Further develop career pathways within social
work
• Leadership development
• Service redesign
• Focus on delivery of statutory work.
• Digital skill development
74

Page 75

Appendix 3 - Council wide Workforce Profile 2023 /2024 
Section 1: Headcount and Full Time Equivalent
Over the year 2023/24, South Lanarkshire Council (SLC) employed an average of 17,086 employees, equating to 14,046 Full Time Equivalent
(FTE)*.
*Average over the year
Across the Council, there are five Resources, Community and Enterprise, Education, Finance and Corporate, Housing and Technical and Social
Work. The split of each Resource is shown below in Table 1 by Headcount (number of employees) and Total FTE:
Table 1 – SLC Headcount and FTE
75

Page 76

Education sits as the largest Resource, employing 49% of the workforce and comprising 48% FTE. Education has the highest number of Casual
Employees (mainly supply teachers) in the workforce, as shown in Table 3 - Employment Category.
The second largest Resource by headcount is Community and Enterprise (20%), then Social Work (17%), Housing and Technical (9%) and
Finance and Corporate (5%).
When measured by FTE, we see the same structure, with Community and Enterprise the second largest Resource (19%), followed by Social
Work (18%), Housing and Technical (9%) and Finance and Corporate (6%).
Table 2 – Resource Makeup and Headcount
Each Resource is, comprised of Services detailed in Table 2. Casual Employees have been excluded from the headcount: 
7616
76

Page 77

Temporary
Although Education is the largest Resource overall, the single largest Service within the Council is Facilities, Waste and Grounds (FWG). This
is due to two main factors:
• ‘Facilities, Waste and Grounds is made up of three sub services.
• Due to the nature of the work conducted by Facilities (such as Cleaning and Janitorial), the Service employs a high proportion of part-
time and term-time employees (as shown in Table 4), resulting in an increased headcount. Facilities makes up 53% of all Community and
Enterprise employees. 
Section 2: Employment Categories and Hours Worked
As of 31st March 2024, SLC employed 16,740 employees, with a combined total of 17,666 assignments. 769 employees were categorised as
Casual, and of these, 775 employees were employed in their main post as a casual employee. 56 employees with a primary Permanent or
Temporary post, also held a secondary casual post.
Table 3 details the Employment Category of SLC employees, by Resource: 
Table 3: Employment Category Split 
Resource Permanent
Employees
Temporary
Employees
Casual
Employees
Total
Employees
SLC 15377 594 769 16740
Community and Enterprise 3229 86 2 3317
Education 7106 362 719 8187
Finance and Corporate 847 30 4 881
Housing and Technical 1362 79 1 1442
Social Work 2833 37 43 2913
Casual 
Permanent
92%
77

Page 78

As noted in Section 1, Education employs the largest number of Casual Employees within SLC, accounting for 93% of all Casual Employees, as
shown below in Table 4. These employees are predominantly Temporary Teachers (Supply Teachers), which account for 80% of Casual
Employees within the Resource, followed by Music Instructors (7%) and Early Years Practitioners (5%).
Social Work Resources employs the second highest number of Casual Employees at 6%. These are mainly comprised of Residential Supply
Staff within the Adults and Older Peoples Service, which account for 88% of all Casual Employees within Social Work. 
The full split of Causal Employees by Resource is shown below:
Top 3 Casual Positions per Resource (if applicable)
Table 4: Casual Employee Split by Resource 
Education
93% 
Finance and
Corporate
1% Housing and
Technical
0% 
Social Work
6% 
Community and
Enterprise
0%
1) Education:
1. Temporary Teachers (80%)
2. Music Instructors (7%)
3. Early Years Practitioners (5%)
2) Social Work
1. Social Care Assistant - Residential Supply (88%)
2. Placement Supervisor (5%)
3. Social Care Worker – Residential Supply (2%)
3) Finance and Corporate
1. Call Services Assistant (75%)
2. Business Change Officer (25%)
4) Community and Enterprise
1. Cleaner (50%)
2. Catering Assistant (50%)
5) Housing and Technical
1. Clerical Assistant (100%)
78

Page 79

*Please note that for all further data sets, casual employee figures have been removed. The total number of employees as of 31st March
2024 is therefore 15,971.
The majority of the Council’s workforce is employed on Full Time permanent contracts, which for the purposes of this report, has been taken to
mean employees working 35 hours or greater per week at a Full Time Equivalent greater than or equal to 0.90. Term – Time employees who
meet this criteria over 39 weeks have also been included in the Full – Time count.
As shown below, 56% of SLC’s workforce were employed Full Time, with the remaining 44% categorised as Part Time employees as of 31st
March 2024: 
Table 5: Part Time / Full Time Split SLC Split as Percentage Full Time Split of Each Resource 
Part
Time
42%
Full 
Social Work
65% 
Housing and
Technical
79%
Community and
Enterprise
44% 
Education
56% 
Finance and
Corporate
68% 
Community and Enterprise Resources does not have a majority of its workforce employed in full–time positions, this is due to the nature of the
Facilities Service, which employs 86% of its headcount, or 1547 employees, on part–time contracts (from a total of 1803 employees). Five roles
comprise the majority of these part – time positions and are shown below as a percentage of total part – time employees, alongside the total
number of employees in each position.  
Resource Total
FT
Total
PT
No.
Employee
s
South Lanarkshire Council 9267 6704 15971
Community and
Enterprise 1464 1851 3315
Education 4207 3261 7468
Finance and Corporate 593 284 877
Housing and Technical 1139 302 1441
Social Work 1864 1006 2870 
79

Page 80

Table 6: Facilities – Top 5 Part – Time Positions 
Catering Assistant
33% Facilities Asst
(SXP)
6% 
Cleaner
46%
Primary Cook in
Charge
4% 
Janitor/Cleaner
3% 
Due to this unique makeup, Facilities has a higher proportion of employees with more than one assignment relative to the rest of the Council,
with employees holding 1.4 assignments on average and 555 employees having at least 2 assignments. Of those who work more than one
assignment, the highest number worked was 5 (2 employees, all positions as Cleaner) and the average was 2.24.
Service PT Employees Total FTE
FACILITIES 1547 602
Cleaner 717 267
Catering Assistant 506 185
Facilities Asst (SXP) 90 26
Primary Cook in Charge 67 44
Janitor / Cleaner 39 22 
80

Page 81

Section 3: Leavers and Turnover
Leavers
From 1st April 2023 to 31st March 2024, 1709, employees left the council, equating to 1239.55 FTE. Table 7 shows the total leavers by
Resource and displays the headcount as a percentage of total leavers across SLC. 
Table 7: Leavers by Resource Resource Contribution to Total Leavers 
Social Work
19% 
Housing and
Technical
7% 
Finance and
Corporate
5%
Community and
Enterprise
31% 
Education
38% 
This is broadly aligned with what we would expect from the Resource sizes shown in Section 1, with two exceptions; Education sees a
comparatively lower share of leavers relative to its size, while Community and Enterprise sees a much larger share.
Table 8 details all leavers and the reason for leaving and Table 9 shows a breakdown of leavers by Resource, provide context to the higher
number of leavers found within Community and Enterprise.
Resource No. of Leavers Total FTE
South Lanarkshire Council 1709 1239.55
Community and Enterprise 526 329.99
Education 661 531.37
Finance and Corporate 86 66.48
Housing and Technical 115 92.10
Social Work 321 219.61 
81

Page 82

Table 8: Reasons for Leaving South Lanarkshire Council 
400
350
300
250
200
150
100
50
0
No. of Leavers   Total FTE 
As shown above, the five most common reason for leaving the Council are Retirement (22%), followed by Personal Reasons (19%), Career
Development (14%), Termination of a Fixed Term Contract (12%) and Other Teaching Employment Elsewhere (8%). In total, these five reasons
account for three – quarters of all leavers in the year 2023/24.
82

Page 83

The top five reasons for leaving by FTE are shown below for each Resource, as a percentage of their total leavers:
Table 9
Community and Enterprise Education 
Retirement
16%
Career
Development
12%
Resignation - No
Notice Given
5%
Personal Reasons
10%
Termination Of
Temporary/Fixed
Term/Contract
Staff
10% 
Other Teaching
Employment
Elsewhere
26% 
Personal
Reasons
17%
Termination Of
Temporary/Fixed
Term/Contract Staff
30%
Opted
Out/Leaving
Teaching
10%  Retirement
19%
Finance and Corporate
Dismissal Due To Ill
Health
4% 
Moving Outwith
Area
4%
Personal Reasons
12% 
Retirement
45% 
Career
Development
22%
83

Page 84

Housing and Technical Social Work
Retirement Due
To Ill Health
7%
Offered
Permanent Post
8% 
Personal Reasons
17% 
Retirement
28% 
Career
Development
22%
Dismissal Due
To Ill Health
5%
Retirement Due
To Ill Health
10% 
Personal
Reasons
19% 
Retirement
20% 
Career
Development
20% 
From the Community and Enterprise chart, we see Termination of Temporary Contracts accounts for 30% of Leavers. This is due to the nature
of the work undertaken by the Grounds service, which due to seasonal requirements, recruits a high number of seasonal posts and accounts
for 95% of employees leaving the Resource due to this reason.
Turnover
Turnover for the year 2023/24 was calculated as the total number of employees who left the Council between 1st April 2023 and 31st March
2024 (1709), divided by the average number of employees in post during the year (16,339 exc. Casual).
The Turnover Rate for the Council for 2023/24 was 10.46% and is broken down by Resource below:
84

Page 85

Table 10: Resource Turnover 
Community and Enterprise
15% 
0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 
As highlighted in Leavers, Community and Enterprise employs a higher number of seasonal employees relative to the other Resources, and
therefore we would expect the higher turnover percentage shown in Table 10. 
Education
85

Page 86

Section 4: Gender
As shown in Table 11, the gender of the Council’s workforce is predominantly female, at 74% of the total workforce. Four Resources have a
female majority workforce, with only Housing and Technical Resources being comprised of predominantly male employees.
Table 11: Gender Split – Employee Numbers 
Resource Female Male Total
Employees
SLC 11846 4125 15971
Community and Enterprise 1794 1521 3315
Education 6442 1026 7468
Finance and Corporate 657 220 877
Housing and Technical 508 933 1441
Social Work 2445 425 2870 
Table 12: Gender Split – Percentage of Workforce 
SLC 
Community and Enterprise 
Education 
Finance and Corporate 
Housing and Technical 
Social Work 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 
The largest variations are seen within Education and Social Work, with over 85% of the workforce being female.            
86

Page 87

Section 5: Age Profile
Table 13: Age Profile
65+ Years
60-64 Years
10%
4% 
16-19 Years
0%
20-29 Years
12% 
30-39 Years
22%
As shown by Table 13, South Lanarkshire Council has an older
workforce, with 66% of employees being aged 40 or over and the
largest age demographic being 50-59, with 28% of the Council’s total
employees. 
Almost every Resource see the highest proportion of their workforce
within the 50-59 bracket, with only Education peaking earlier at 30-39
Years. 
50-59 Years
28% 
40-49 Years
24% 
Resource 16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
South Lanarkshire Council 61 1862 3536 3749 4475 1670 618 15971
Community and Enterprise 15 187 532 678 1075 562 266 3315
Education 12 1127 2044 2021 1705 445 114 7468
Finance and Corporate 8 62 135 208 352 89 23 877
Housing and Technical 17 200 276 273 402 186 87 1441
Social Work 9 286 549 569 941 388 128 2870
87

Page 88

Table 14 shows the makeup of each age range by Resource. Here we see the lower age brackets dominated by Education, due to newly
qualified Teachers, while Social Work and Community and Enterprise gradually make up higher proportions as we move past 50-59. 
Table 14: Proportion of Age Band by Resource 
16-19 Years 
20-29 Years 
30-39 Years 
40-49 Years 
50-59 Years 
60-64 Years 
65+ Years 
Community and Enterprise Resources  Education Resources  Finance and Corporate Resources  Housing and Technical Resources  Social Work Resources
25%
10%
15%
18%
24%
34%
43%
27%
38%
54%
58%
3% 61%
28% 13% 20%
21% 14% 4% 18%
23% 11% 5%
21% 9% 8%
15% 7% 6%
16% 8% 4%
15% 11%
15%
88

Page 89

Section 6: Absence Rate
Absence rates for the Council are calculated each calendar month by dividing the total number of workdays lost due to absence by the total
number of workdays available for that period. The absence rate for South Lanarkshire Council for the year 2023/24 was 5.38%, which exceeds
the target of 5% and is down 0.34 points on the previous year, 5.72%. 
7.00% 
6.00% 
5.00% 
4.00% 
3.00% 
2.00% 
1.00% 
0.00%
Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar
89

Page 90

Table 15, below, details the absence level of each Resource. A Green arrow indicates that the absence level has reduced vs the previous year
and a red arrow indicates an increase.
Table 15: Resource Absence Levels 
2022/23 Absence    
Social Work: 7.58% Community and Enterprise: 6.88% Housing and Technical: 5.91% Education: 4.60% Finance and
Corporate: 3.75% 
While absence levels have decreased year on year, the rate still remain above the Council targets and are above national averages*.
Social Work have the highest absence rate, sitting above the average Council level, followed by Community and Enterprise. Both Resources
deliver a number of frontline services and as noted in Section 4, these Resources make up the greatest proportions of the Council’s higher age
ranges and also have a greater level of physical role requirements relative to other areas of the Council, with employees required to carry out
tasks involving manual handling and moving and assisting.
This provides some additional context to the higher levels of Turnover seen in Section 3, particularly Table 9, where we see Social Work with a
higher proportion of employees leaving due to ill health.
The data for absence is for 2023/24, for the period April – October 2024/25 absence levels are rising, 5.5% for Council and 3 of the five
Resources have higher absence rates than the same period last year. There continues to be a focus on reducing absence.
*research from the Chartered Institute of Personnel & Development (CIPD) shows that employee sickness absence is at the highest level for 15
years, with an average of 3.4% which equates to 7.8 days per employee, for the workforce across the whole of UK (note – it was previously 5.8
days in 2019).
90

Page 91

Tables 16 and 17 show the absence level for each Service within Social Work and Community and Enterprise, respectively. Here, we see that
the largest Services in each Resource - Adults and Older People, and Facilities, Waste and Grounds – also have the highest absence rates
and are therefore a key contributor to the Resources overall higher levels.
Table 16: Social Work Absence Rate by Service 
Table 17: Community and Enterprise Absence Rate by Service 
91

Page 92

Section 6.1: Absence Categories
The total number of working days lost due to absence in the year 2023/24 was 208,401. Table 18 shows the number of working days lost due
to specific categories of absence for the year 2023/24.
Table 18: Days Lost Due to Absence Reason 
80000 
70000 
60000 
50000 
40000 
30000 
20000 
10000 
0
Psychological Musculoskeletal Respiratory Stomach, Bowel,
Blood /
Metabolic
Disorders 
Gynaelogical /
Urological 
Cancer  Ear / Nose /
Throat / Mouth
& Eye 
Neurological,
Endocrine 
Cardiovascular Skin Infectious
Diseases 
Psychological absences are the main cause of absence, accounting for 35% of absences throughout the year, followed by Musculoskeletal
(21%), Respiratory (13%) and Stomach, Bowel, Blood / Metabolic Disorders (9%). Skin (1%) and Infectious Diseases (1%) are the least
common types of absence.
Due to the year-to-year fluctuation of total numbers of absence, absence proportions will be compared below. Each absence reason has been
calculated as a percentage of ‘working days lost due to absence reason’ divided by ‘total working days lost in year’ to illustrate changes in
absence across the years 2021/22 – 2023/24. The top four reasons for absence in 2023/24 are shown in Table 19 and the remainder in Table
20. (Please note, where the information is available, COVID-19 related absences have been excluded from Respiratory).
92

Page 93

Table 19: Most Common Reason for Absence – Year to Year Comparison 
Psychological 
Musculoskeletal 
Stomach, Bowel, Blood / Metabolic Disorders 
Respiratory 
0% 5% 10% 15% 20% 25% 30% 35% 40% 
2023/24   2022/23   2021/22 
The Council Wide level of absence has decreased each year since 2021/22, however still remain above the target and higher absence rates
have been seen in 2024/25. the proportion of Psychological, Musculoskeletal and Stomach absences have risen to a three – year high in
2023/24, accounting for 68% of all absences.
Of the most common reasons for absence, only Respiratory absences have decreased, reducing to 8% - the lowest level vs. the previous two
years. The changing landscape and impact of COVID-19, alongside changes to the protocol for how these have been reported on / recorded
across the years is a key contributing factor to the variances seen across the years.
93

Page 94

Table 20: Other Absence Reasons – Year to Year Comparison 
Neurological, Endocrine 
Gynaelogical / Urological 
Ear / Nose / Throat / Mouth & Eye 
Cancer 
Cardiovascular 
Skin 
Infectious Diseases 
0.0% 0.5% 1.0% 1.5% 2.0% 2.5% 3.0% 3.5% 4.0% 4.5% 5.0% 
2023/24   2022/23   2021/22 
Four out of the remaining seven absence categories sit at a three-year high.
Due to the prevalence of, and increase in psychological absences, these are shown in further detail below as an aggregate across the years
2021/22 – 2023/24:
94

Page 95

Table 21: Psychological Absences by Month (3-year aggregate) 
25000 
20000 
15000 
10000 
5000 
0
April May June July August September October November December January February March 
Psychological absences are most prevalent in Autumn / Winter months, peaking in December, with other notable high points in November and
March. Spring / Summer sees reduced levels, with a minimum in July.
This follows the general trend of absences seen in Section 5.1 and if plotted in the same manner, both Musculoskeletal and Stomach absences
follow this pattern as well.
Table 22 uses the data across 2021/22 – 2023/24 to show the average proportion of Psychological absences each month, as a percentage of
total absences during that month:
95

Page 96

Table 22: Proportion of Psychological Absences per Month 
40%
39%
38%
37%
36%
35%
34%
33%
32%
31%
30%
Although there remains a general trend of Psychological absences increasing into the Winter months, the peaks shift to show a higher
proportion of Psychological absences in May and April relative to the rest of the year.
Psychological absences were the main reason for absence across nearly all Resources, excepting Community and Enterprise Resources
where Musculoskeletal absences was the leading reason for days lost. Psychological absences have risen across all Resources from 2022/23
to 2023/24, with the greatest increase seen within Finance and Corporate Resources; Psychological absences accounted for 39% of absences
within Finance and Corporate Resources in the year 2022/23, rising to 47% in 2023/24. Proportions of Psychological absences for each
Service are shown in Table 23 for the years 2022/23 and 2023/24.
Month Average %
May 35.5%
April 35.4%
February 35.1%
January 34.7%
March 34.6%
November 34.0%
December 34.0%
June 33.7%
October 33.6%
September 33.0%
August 32.8%
July 32.6% 
96

Page 97

Table 23: Proportion of Psychological Absences per Service 
50
45
40
35
30
25
20
15
10
5
0
CER EDR FCR HTR SWR 
Proportion of Absences (2023/24)  Proportion of Absences (2022/23) 
This concludes the Section on Absence Analysis and the Report.
97

Page 98

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications
Recruitment,
attraction, and
retention
Approve
Recruitment
Strategy
Robust recruitment
practices to
address the council
Head of Personnel HR Business
Managers
December 2025 Delivered within
existing
resources  
workforce supply      
issues  HR Adviser   
Implement for Robust succession Executive Directors Learning and April 2026 Delivered within 
succession plans in place / Head of Personnel Organisational  existing 
planning across Resources  Development  resources 
process for all to mitigate risks of  Manager   
managers loss of skills and     
Grade 5 and experience across     
above the senior
leadership teams 
HR Business
Managers   
Continue to Increased Executive Directors HR Business December 2025 Delivered within 
develop ‘grow workforce supply  Managers  existing 
your own’ and reduction in    resources 
approach to skills shortage    
98

Page 99

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
address skills
gaps
Expansion of
initiatives such as
Care Academy     
Improve
reporting of
council
characteristics
An improved suite
of HR reports is
created within the
Council
Head of Personnel Executive
Directors
March 2026 Delivered within
existing
resources
Improve
reporting on
equality in
recruitment and
leavers
Widen and improve
the suits of
reporting on
equality in
recruitment and
leavers
Head of Personnel Executive
Directors
March 2026 Delivered within
existing
resources
99

Page 100

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
Use all available
mechanisms to
better promote
local
government as
an employer
Create a campaign
of activity to
promote local
government
employment, in
advertising posts.
Head of Personnel Executive
Directors
March 2026 Delivered within
existing
resources
Transformation Progress actions
associated with
Overtime
Reduction
Review
Delivery of services
within core staffing
without the reliance
on overtime
Head of Personnel /
Head of Finance
(strategy)
HR Business
Managers /
Finance
Managers /
Resource
Management
Teams
2025 / 26 and
2026/27
Achievement of
savings identified
as part of the
review
Progress
outcomes of
Organisational
Management
structures reviewed
in line with current
preferred operating
Head of
Personnel/Executive
Directors
HR Business
Managers /
Resource
2025 / 26 and
2026/27
Achievement of
savings identified
100

Page 101

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
Structure
Review
model and
revisions
implemented 
Management
Teams 
as part of the
review
Support change
management
across the
Council
Improved resilience
and organisational
effectiveness
Organisational
Development
Manager
HR Business
Manager /
Resource
Management
Teams
December 2025 Delivered within
existing
resources
Review
SWITCH 2
arrangements
Management of
savings
implementation
through effective
redeployment
process.
HR Business
Managers
HR Adviser 
Service
Managers
April 2026 Achievement of
savings
101

Page 102

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
Resource
specific training
to support
implementation
of new IT
systems (SW
and HAT)
Capable workforce
ready for
implementation of
new system
IT leads/ Resource
Management
Teams
IT Support /
Change
Management
and Learning
and
Development
Support
March 2027 Within project
plan
Skills Gaps Resource
specific
initiatives to
equip workforce
for legislative
changes
Workforce able to
adapt to deliver any
legislative changes
Executive Directors HR Business
Managers /
Heads of
Service
2025 - 27 Delivered within
existing
resources 
Enable
managers to
support
transformational
change
Workforce can
adapt to
organisational
change.
Executive Directors HR Business
Managers /
Heads of
Service
2025 - 27 Delivered within
existing
resources
102

Page 103

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications
Delivery of key
Council activity such
as climate impact
and digital
transformation
Awareness of
climate impact
across all
employees
Workforce aware of
the impact of on
climate and actions
to reduce impact
Head of Enterprise
and Sustainable
Development
Learning and
Organisational
Development
Manager
2025 - 27 Delivered within
existing
resources
Develop
workforce to
deliver across
Resources to
support climate
action. E.g.
green skills
Resource and
service specific
skills development
to support
reduction of climate
impact
Head of Sustainable
Development
Executive
Directors
March 2026 Delivered within
existing
resources 
Undertake a
skills audit of
current
workforce to
Provide a baseline
on digital skills and
awareness
Head of IT /
Learning and
Development
Manager
Resource
Management
Teams / HR
Business
Managers
December 2025 Delivered within
existing
resources
103

Page 104

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
assess digital
inclusion     
Ensure the
workforce is
equipped to
support
development of
Artificial
Intelligence and
Digital service
delivery
Skilled workforce
able to maximise
the use of artificial
intelligence. 
Skilled workforce to
support delivery of
digital services.
Head of IT /
Learning and
Development
Manager
Resource
Management
Teams / HR
Business
Managers
2025 - 2027 Within existing
provision for
delivering a
digital Council
Resource
specific training
to support
implementation
of new IT
systems (SW
and HAT)
Capable workforce
ready for
implementation of
new system
IT leads/ Resource
Management
Teams
IT Support /
Change
Management
and Learning
and
Development
Support
March 2027 Within project
plan
104

Page 105

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications
Maintaining
employee health and
well being
Implement the
actions identified
as an outcome
of the review of
Maximising
Attendance
Policy and
supporting
procedures
Ensure that the
Council continues
to develop good
practice to support
and engage the
workforce
Head of Personnel HR / Line
Managers
December 2025 Delivered within
existing
resources 
Annual review of
employee
wellbeing
initiatives and
campaigns to
provide to
improved
supports and
increase
Supported,
engaged, and
motivated
workforce
Head of Personnel HR / Line
Managers
March 2026 Delivered within
existing
resources
105

Page 106

Appendix 4 – Council Workforce Action Plan 2025 – 27
Priority/Identified
Needs
What are the future
workforce priorities
based upon your
supply and demand
analysis?
Actions
What specific
actions that are
needed to
deliver each
priority? 
Anticipated
Outcomes 
Lead Officer
Who is
responsible for
delivery? 
Support
What support
do we need?
Who else
needs to be
involved? 
Timescale
What are the
timeframes for
delivery? 
Financial
Implications 
resilience of
employees     
Employee
appraisal
Continued
employee
development, to
ensure the skills to
deliver services
Head of Personnel HR / Line
Managers
March 2026 Delivered within
existing
resources 
Leadership
Development
Effective support
and development
for current and
future leaders
across the Council
Head of Personnel Executive
Directors
December 2025 Delivered within
existing
resources 
106

Page 107

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Council’s Youth Champion and Representative on
Regen:fx Youth Trust 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the appointment of Councillor Mathew Buchanan to replace
Councillor Gavin Keatt as the Council’s Youth Champion and representative on
the Board of Regen:fx Youth Trust 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Councillor Mathew Buchanan replace Councillor Gavin Keatt as the
Council’s Youth Champion and representative on the Board of Regen:fx
Youth Trust. 
[1recs]
3. Background
3.1. Councillor Gavin Keatt was appointed as the Council’s Youth Champion at the
statutory meeting of the Council in May 2022 and, as such, has been the Council’s
representative on the Board of Regen:fx Youth Trust. 
3.2. Following a request from the Labour Group Business Manager, it is proposed that
Councillor Matthew Buchanan replace Councillor Gavin Keatt as the Council’s Youth
Champion and representative on the Board of Regen:fx Youth Trust. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1 None. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1 There are no risks or sustainability issues in terms of the information contained in
this report.
8
107

Page 108

8. Integrated Impact Assessment and Consultation Requirements
8.1. There was no requirement for an integrated impact assessment or formal
consultation in terms of the information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
7 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Fair, open and sustainable
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council of 18 May 2022 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Susan Somerville, Administration Manager
Ext:  4197  (Tel:  01698 454197)
E-mail:  susan.somerville@southlanarkshire.gov.uk
108

Page 109

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Chief Executive  
Subject: Community Wealth Building Legislation – Call for
Views 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the committee with a draft of the Council’s response to the Scottish
Parliament’s call for views on the Community Wealth Building (Scotland) Bill
[1purpose]
2. Recommendation(s)
2.1. The committee is asked to approve the following recommendation(s):-
[]
(1) that the contents of the report be noted; and
(2) that the draft response be approved and submitted to the Scottish Parliament.
3. Background
3.1. In the Programme for Government 2024, the Scottish Government signalled its
intention to bring forward a Community Wealth Building (CWB) Bill in 2025 to
address economic and wealth inequality. 
3.2. The Community Wealth Building (Scotland) Bill was introduced on 20 March 2025
and is described as a Bill to create jobs and drive economic growth across Scotland
by promoting investment in communities. 
3.3. The Scottish Parliament’s Economy and Fair Work Committee is conducting stage 1
scrutiny of the Bill and has issued a call for views to inform their deliberations.  This
report presents a draft response from South Lanarkshire Council to the call for views. 
4. The CWB Bill
4.1. The Bill seeks to advance the implementation of the CWB model of economic
development in Scotland. It aims to “ensure consistent implementation of the model
across Scotland’s local areas and regions…by facilitating and supporting the
generation, circulation, and retention of more wealth in local and regional
economies.” 
4.2. The Bill makes provision for CWB in three ways:- 
 it places a duty on Scottish Ministers to produce and publish a CWB statement
setting out measures to be taken by the Scottish Government in relation to CWB
 it requires local authorities, acting with certain public bodies within the local;
authority area, to produce CWB action plans setting out the measures to be taken
within the local authority area in relation to CWB and to implement those plans so
far as reasonably practicable; and
9
109

Page 110

 it places a duty on the Scottish Ministers to produce guidance in relation to both
the production of action plans and the inclusion of CWB measures in strategic
planning by public bodies. 
5. The Call for Views
5.1. The call for views was issued by the Scottish Parliament’s Economy and Fair Work
Committee on 4 April 2025, with a deadline for submissions of 23 May 2025. 
5.2. The Economy and Fair Work Committee has asked for views around the following
questions:- 
 The Scottish Government’s objective is to ensure consistent implementation of
Community Wealth Building across Scotland.
(a) Do you think the proposed Bill will achieve this object?
(b) Does the Scottish Government need to change the law to achieve this
objective?
(c) Are there other ways in which the Scottish Government could achieve this
objective?
 The Bill would place extra duties on some public sector organisations. Are these
duties proportionate? Do these organisations have the capacity and resources to
meet the duties placed on them?
 Do you agree with the list of relevant public bodies proposed in the Bill? If not,
how should these be changed?
 Do you agree with the list of specified public bodies proposed in the Bill? If not,
how should these be changed?
 Are there any ways the law in devolved areas could be changed to facilitate
Community Wealth Building that are currently not proposed in the Bill?
 Are there any potential unintended consequences to the proposed Bill?
 To what extent will small businesses benefit from this Bill?
 To what extent will small businesses benefit from this Bill? 
5.3. The Council’s draft response is attached at Appendix 1.  The response draws on the
Council’s experience of delivering a CWB strategy over the last four years, and
reiterates some of the points the Council previously made in response to the
consultation by the Scottish Government about the nature and scope of CWB
legislation. 
6. Next Steps and Recommendations
6.1. The deadline for the call for views was 23 May 2025. However, in order to allow for
approval by the Executive Committee, the Council has obtained agreement to submit
its written response on 28 May. 
7. Employee Implications
7.1. There are no direct employee implications. 
8. Financial Implications
8.1. There are no direct financial implications. 
9. Other Implications
9.1. None. 
10. Integrated Impact Assessments and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.
110

Page 111

Paul Manning
Chief Executive 
25 April 2025 
Link(s) to Council Objectives/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
• None 
List of Background Papers
• None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tom Little, Head of Communications and Strategy
Ext:  4904  (Tel:  01698.454904)
E-mail:  Tom.Little@southlanarkshire.gov.uk
111

Page 112

Appendix 1: draft response to call for views 
Scottish Parliament’s Economy and Fair Work Committee
Stage 1 scrutiny on CWB (Scotland) Bill 
The Scottish Government’s objective is to ensure consistent implementation
of Community Wealth Building across Scotland.
(a) Do you think the proposed Bill will achieve this object? 
SLC welcomes the CWB Bill and with it the opportunity to comment as part of the
scrutiny process. 
In 2021, the council agreed a CWB strategy, one of the first in Scotland.  Since
then, the council has been working with local partners to deliver the strategy,
working to an action plan spanning the five pillars of CWB. 
We believe the proposed Bill has the potential to greatly improve CWB activity
across Scotland.  It will ensure all council areas develop CWB action plans, and
that those plans have regard to the pillars/themes as set out in the Bill and
subsequent guidance. 
It will require the public bodies specified in the Bill to publish and implement a
CWB action plan. This will provide a welcome stimulus to the partnership element
of CWB, by motivating specified public sector agencies to work together on CWB
goals. 
There is potential for more co-ordinated support to be made available through the
involvement of regional public bodies such as Skills Development Scotland and
the enterprise agencies, and the Bill will encourage progress on this front. 
The proposed Bill will require Scottish Ministers to publish a statement on CWB as
well as guidance and direction to aid implementation of the duties. This should
bring clarity and focus to the CWB agenda and help ensure a whole-government
approach and a joined-up policy landscape to support CWB. 
All of these measures will increase the visibility and importance of CWB. 
In the original consultation on the proposed legislation, we were of the view that a
duty requiring Scottish Ministers and prescribed public sector bodies to embed the
CWB model of economic development into their corporate plans and wider
strategies was the best approach to adopt.  We believe this provides for individual
accountability and also avoids the creation of additional plans and potential
complexity. 
We would advocate that the legislation and associated guidance should seek to
stimulate and support agency within anchor organisations to develop strategies
and plans, with associated actions, which are locally appropriate to build
community wealth.  A duty needs to be enabling, rather than creating an additional
layer of bureaucracy.  Legislation should therefore be about helping those who
want to deliver change to be empowered and feel that Scottish law is supportive. 
We believe it is important that CWB is developed in ways which are sensitive to
local circumstances and conditions.  What works for an urban council area may
not work for a rural area.  Local and regional economies have many points of
112

Page 113

similarity but also many differences across Scotland, and CWB must be flexible
enough to be deployed effectively across these different geographies. 
(b) Does the Scottish Government need to change the law to achieve this
objective? 
Yes
Please explain your answer: 
To achieve the active engagement and participation of the full range of public
sector bodies – yes, a requirement in law is necessary.  This ensures that all
relevant public service agencies recognise they have a role to play and give due
regard to CWB in their planning and delivery. 
In the current climate, with increasing demands on services and rising costs,
councils and other public sector bodies are faced with difficult choices about the
services they deliver and activities they engage in.  When funding is squeezed,
statutory services tend to be protected at the expense of non-statutory services. 
For this reason, we believe CWB needs to be put on a statutory footing to ensure it
is given appropriate weight by all relevant agencies. 
Having said that, however, we make a number of points elsewhere in this
submission: 
• CWB brings a range of demands on limited resources, and it is imperative
that any additional duties in this space are properly funded.
• Legislation can work alongside a range of other measures to support the
implementation of CWB in Scotland and should avoid adding complexity
and layers.
• Flexibility at the local level is needed to ensure CWB implementation is
appropriate to local circumstances and needs. 
(c) Are there other ways in which the Scottish Government could achieve
this objective? 
There are non-legislative measures which could be taken to advance the objective,
but we would see these as working in tandem with the legislation. 
We would highlight the potential role of the Supplier Development Programme
(SDP), which is a well-established service with considerable and evidenced reach
at local, national, and regional levels.   
The reach of the SDP is ensured by the membership of all 32 Scottish local
authorities, 17 other public bodies, and further corporate memberships.  Over
20,000 Scottish SMEs are registered with the programme, including 655 social
enterprises.  Governance structures ensure appropriate local and regional
adaptations in service delivery. 
It would be helpful if other public sector bodies (e.g. NHS boards) could obtain free
access to SDP services or if membership of SDP could be on an area wide basis
(and cover all public sector bodies in an area). 
In relation to the SDP in particular, we would propose that:
113

Page 114

• SDP is further resourced and invested in by Scottish Government as a
Scotland-wide service; promoted as a key source of Community Wealth
Building information, advice, guidance and engagement events for
Scotland’s public and private sectors in relation to the spend pillar; and
provided free of charge to all SMEs and social enterprises; 
• SDP is embedded and engaged in any Community Wealth Building strategy
development work across all relevant Scottish Government functions; 
• Scottish Government investment is expanded from limited annual grant
support to more secure year on year budgetary support for SDP’s existing
remit and to adequately resource spend-pillar related services to Scotland’s
public sector and private sector primary/larger contractors. 
Other measures which could support the implementation of CWB include: 
• Support for more joined up working between partners, particularly in terms
of procurement and employment. This is necessary at a national and a local
level.  Variations in staffing resource, policies, procedures and systems
across agencies can make having a consistent approach difficult. More
effective sharing of knowledge and resources would build capacity, reduce
duplication and enhance resilience and flexibility. 
• A national social marketing campaign and communications toolkit for local
use to raise awareness of the principles of a wellbeing economy with
accessible language/concepts which highlights the benefits and
contributions of all stakeholders. 
• Influence external funding providers, such as Big Lottery, to align their
interests and funding criteria to the Community Wealth Building effort. 
• Skills development and training to enable SMEs to be involved the delivery
of large scale retrofit projects to achieve net zero by 2045, for example,
energy efficiency measures and decarbonisation projects. 
• Guidance / policy is required on the development of local supply chains with
SMEs and particularly amongst social enterprises in localities where the
sector is not as strong or well developed as in other localities. A better
understanding within anchor organisations of what the realistic
requirements are to make SMEs / SEs ‘tender ready’ to allow them to
access supply chains cannot occur without significant and ongoing capacity
building. This is currently supported by the Supplier Development
Programme across local authorities.  (See comments on SDP above.) 
The Bill would place extra duties on some public sector organisations. (The
Bill would require local authorities and 'relevant public bodies' to publish and
implement a CWB plan for their area.)
Are these duties proportionate? Do these organisations have the capacity
and resources to meet the duties placed on them? 
114

Page 115

The Financial Memorandum accompanying the proposed Bill provides an estimate
of costs, which for local authorities are focused on the requirement to work with
local anchors to develop and implement a CWB action plan; to consult on and
publish the CWB action plan; and to review and update CWB action plans taking
account of any associated guidance produced as part of the legislation. 
These are additional duties for local authorities and if the burden of developing and
co-ordinating the CWB plan and implementation falls on local authorities, it is
imperative that resources are made available to enable the discharge of these new
duties. 
While some aspects of the duty may be met within existing resources – such as
the governance and reporting requirements (though they are not without cost) –
our experience shows that significant limitations exist due to the capacity of other
organisations (e.g., SMEs) and communities to engage with CWB initiatives.   
CWB is a relatively new field, and the key ideas are unfamiliar to many partners
and stakeholders.  There is therefore a need to explain, promote, educate, and
advocate to generate interest in and support for CWB in local areas.  Over and
above this, some of the processes which are integral to CWB (for example, asset
transfer or public sector procurement) are potentially complex and technical in
some respects.  This presents a barrier to effective engagement and there is a
resource implication on local authorities in terms of helping individuals, businesses
and communities to engage with the opportunities available to them through CWB. 
In short, successful implementation of CWB is an ongoing and active process,
which requires resourcing across a number of fronts in order to help stakeholders
navigate and make best use of what is available – and we have found this to be
resource-intensive, at least in the initial stages. 
Do you agree with the list of relevant public bodies proposed in the Bill? If
not, how should these be changed? 
Alongside local authorities, 'relevant public bodies' would be required to publish
and implement a CWB action plan.
The proposed relevant public bodies are:
• colleges
• health boards
• Scottish Enterprise
• South of Scotland Enterprise
• Highlands and Islands Enterprise
• Skills Development Scotland
• regional transport partnerships 
115

Page 116

We agree with this list. 
Public bodies which work to larger geographies than local authorities are often
limited in how much they can develop a local perspective due to a requirement to
operate equitably across the geography.  CPP experience also highlights that
agencies which cover several local authorities can find themselves spread thinly
as each authority seeks their input to specific strategies and plans.  Guidance will
need to ensure that these public bodies can contribute effectively. 
Do you agree with the list of specified public bodies proposed in the Bill? If
not, how should these be changed?
‘Specified public bodies’ must have due regard to CWB guidance from the Scottish
Government when developing their corporate plans and associated delivery
strategies.
The proposed specified public bodies are:
• Creative Scotland 
• Crown Estate Scotland
• Highlands and Islands Airports Ltd
• Historic Environment Scotland
• Integration Joint Boards
• National Park Authority
• NatureScot
• Scottish Police Service
• Scottish Canals
• Scottish Courts and Tribunals Service
• Scottish Environment Protection Agency
• Scottish Fire and Rescue Service
• Scottish Forestry
• Scottish Funding Council
• Scottish Futures Trust Ltd
• Scottish Land Commission
• Scottish National Investment Bank
• Special Health Boards
• Sportscotland
• Scottish Water
• VisitScotland 
We agree with this list.
Are there any ways the law in devolved areas could be changed to facilitate
Community Wealth Building that are currently not proposed in the Bill? 
116

Page 117

Our response is organised across the different pillars recognised within CWB. 
Spending Pillar
The procurement rules would need to be amended to allow for CWB. 
Legislating for the inclusion of local and sustainable supply chains in public
contract documentation would encourage development of local businesses and
suppliers. The weighting in any price/quality split for evaluation of tenders could
include a higher scoring where local contractors or suppliers are utilised. There
could be statutory targets for the number of apprentices employed each year. 
While sustainable procurement duty does support CWB, it does not allow for
procurement limited to local suppliers, as regulated procurements are still subject
to underlying general principles of equality, non-discrimination and openness. 
It would be helpful to see a change in focus of procurement rules for regulated
procurements from collaboration/use of Scotland Excel or other external
frameworks to maximise use of lots to focus on local areas/local business.  This
focus is long established. 
The Scottish Government and Scotland Excel need to consider how to attract local
suppliers to join national frameworks and maximise advertising of sub-contracting
opportunities. 
In addition, there is a need to promote cultural change in approach to procurement
- financial constraints in public sector result in a focus in the use of frameworks
and larger contracts. As noted elsewhere in this response, increased levels of local
procurement could come at cost to the public sector. An increase in local
procurement activity would be expected to have a resourcing impact from a
procurement and service perspective. Procurement resources are typically
stretched across most local authorities and adding further demands on the service
risks those demands being impossible to meet without additional funding and
staffing being provided. 
Simplification of the procurement rules for regulated procurement would minimise
barriers to bidding for contracts while still allowing public bodies to have assurance
in those bidders awarded contracts. A review of the threshold for seeking
community benefits should be considered. This is currently set at £4m although
South Lanarkshire Council have set it at £50k. 
It should be noted that not all local authorities will have the local suppliers capable
of fulfilling their service requirements or are willing to undertake the required steps
to procure from the public sector. 
Land and property pillar
• The new National Planning Framework (NPF4) will require planning
applications to be health impact assessed as well as local Development
Plans to incorporate consideration of a range of health and wellbeing
issues.  It would be helpful if the tools/plans developed in support of this
have the CWB principles threaded through.
• 
• Consideration should be given as to how statutory requirements for local
authorities set within the new Local Heat and Energy Efficiency Strategies
can be supported through Community Wealth Building. For example,
117

Page 118

incentivising those building owners making the transition to decarbonised
heat sources to use local SMEs to do so.
• 
• Consideration should also be given to mechanisms which strongly
incentivise private property owners, particularly remote institutions, to invest
in their property assets and evidence commitment to pro-active asset
management. Failure to do so should trigger an option for communities to
take over vacant, underutilised property.
• 
• A Community Wealth Building approach to retrofitting energy efficiency
measures to our housing stock and non-domestic buildings could bring
significant benefits. Using our influence to develop the retrofit supply chain,
we could create millions in direct Gross Value Added (GVA) for the local
economy and also create thousands of jobs for local people in the local
community. 
It would be helpful to see measures which would strengthen the role of social
housing providers to employ local supply chains in their business. 
More generally, there is an opportunity in the move to net-zero to provide social
enterprise capacity at scale to meet future needs in the green economy. 
Employment Pillar
In relation to the employment pillar of CWB, legislation could be a lever to ensure
Fair Work practices are embedded in all projects which are being funded from the
public purse. 
More progressive recruitment should be looked at for public sector agencies,
unlocking more flexible ways to recruit.  National policies and systems can restrict
this, e.g,. within the NHS. More outreach work is needed and a requirement for
agencies to report on what they are doing across this pillar. Focus on anchor
organisations having an employability strategy and getting support from Scottish
Government to prioritise this. 
Finance Pillar
• The aim of the Finance pillar is to increase flow of investment within local
communities, harnessing wealth that exists locally.   Examples include
credit unions, community development finance institutions (CDFIs), social
investment and responsible investment.    However, as financial regulation
is a reserved matter, there is limited scope for legislative proposals in this
area. 
• 
• Any changes to laws or guidance to further advance CWB needs to
consider risks, and who would bear these.  Inherent in any funding or
investment opportunity is risk of loss, and protections need to be considered
for those who bear the risks (most likely through Financial Conduct
Authority’s work).   In the current climate, some credit unions are finding
times tough, some are failing, and there would be significant limitations
(both legally and financially) on the level of support that local authorities
could provide.  With the cost of living crisis squeezing finances across the
board, risks will be higher.  
• 
More generally, ensuring the CWB principles are built into funding criteria
wherever possible would be a positive measure.  For example, ensuring that
national investment funds are more locally and evenly targeted and awarded
118

Page 119

through local partnerships, as opposed to a national competitive process which
leads to a lack of parity across localities. 
Are there any potential unintended consequences to the proposed Bill? 
There is a risk that the proposed Bill will introduce “clutter” by requiring another
plan which sits separately from local and regional economic strategies or other
partnership plans.  For public sector organisations, this can add complexity and
demand additional resources due to separate governance structures and reporting
arrangements.  For stakeholders and members of the public, an additional plan
might be a barrier to getting a clear view of a council’s priorities and performance. 
It is important to consider the financial implications of more local spend and the
balance between procurement regulation and delivery of a CWB strategy.  The
procurement rules and guidance could be amended to allow for greater flexibility in
delivering local targeted procurement. However, how would this align with Scottish
Procurement collaborative approach with the emphasis on securing economies of
scale and value for money? 
It is vital that appropriate funding is in place for public sector bodies to discharge
their many functions.  There is a risk that more local procurement comes at
additional cost to the public sector. 
To what extent will small businesses benefit from this Bill? 
There is potential for small businesses to benefit, however our research into
barriers for small businesses has highlighted the complexity of council
procurement processes, the steep learning curve it presents to SMEs, and the
scale of effort and resource required for a small business to bid for council
contracts.  SMEs need help to engage with council procurement frameworks and
this is a resource-intensive undertaking. 
One of the issues for small businesses in relation to CWB is that, by definition,
they are small businesses, which means they have limited capacity and are not set
up to deliver at scale.  This means that they may not be able to provide a service
across the whole of a council area, and they may be more affected by supply-
chain issues or adverse events such as staff illness, which may impact on their
service.  These factors mean that SMEs struggle to match councils’ needs in key
high-value areas, e.g., school meals, transport, etc. 
These challenges are well-known and can be mitigated or managed only with
focused support – which, again, requires expertise and resources. 
Our comments in respect of the role of the Supplier Development Programme (see
Q1(c) above) are relevant here.  The experience and expertise of the SDP is a key
component of the support available to small businesses when looking to engage
with public sector procurement and contracts. 
119

Page 120

To what extent will local community organisations benefit from this Bill? 
As with small businesses, there is considerable potential for community
organisations to benefit from this Bill, particularly in relation to initiatives such as
asset transfer, community wish lists, participatory budgeting and the like.   
However, as with SMEs, community organisations need support to make the most
of the opportunities available, which means that CWB need to be seen in a
broader context of community empowerment, community capacity building and
local democracy. 
The main benefits as recipients of CWB would be increased income to fund
community-led activities, improved relationships with local and regional businesses
for support, a valued asset and focal point for growing community empowerment. 
However, community organisations also have the potential to become actors and
generators of community wealth, albeit this will rarely be their main motivation. 
A small and local community organisation would need to both aspire to and have
the skills to become economic as well as social actors in their communities. To do
so the type of capacity building would be high quality organisational management
responsibilities and skill such as becoming employers, understanding legal
structures and reporting, managing finances, managing risk and liability. 
An ability to generate income and employ staff and offer local, fair work, is unlikely
to be the main motivation of a community organisations but could be a by-product
if encouraged and supported and we create the right conditions. We have seen the
quick development of organisational management skills and capacity that can
happen through asset transfer processes. 
120

Page 121

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 28 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Strategic Environmental Assessment Progress
2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Committee of the progress in carrying out Strategic Environmental
Assessments (SEA) on the Council’s policies, plans, programmes and strategies
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:-
[re]
(1) that the statutory requirement for SEA to inform the development of Council led
policies, plans, programmes and strategies be noted; and
(2) that progress in conducting SEAs be noted.
[1recs]
3. Background
3.1. The Environmental Assessment (Scotland) Act 2005 requires the Council, as a
‘Responsible Authority’, to carry out a Strategic Environmental Assessment of all its
policies, plans, programmes and strategies. 
3.2. The SEA process helps to integrate environmental considerations into the
preparation and adoption of plans. The SEA is carried out in a staged process
alongside the preparation of the proposed plan. Throughout the process, the plan
can be adjusted to mitigate negative, or enhance beneficial, environmental effects. 
3.3. SEAs help to promote the Council’s commitment to sustainability and is a key priority
within the Sustainable Development and Climate Change Strategy. SEAs are a
valuable resource in raising the profile of environmental considerations and for
facilitating holistic approaches to address the climate and nature emergencies. 
3.4. The Corporate SEA Working Group continues to meet regularly to oversee the
progression of SEAs across the Council. Its remit also includes development and
mainstreaming of employee knowledge and understanding of the SEA process and
development of the skills needed to undertake assessments. The Group is chaired
by the Planning Officer (SEA). 
3.5. The SEA process is further supported by the publication of the biennial South
Lanarkshire State of the Environment Report which provides the baseline
environmental data. Work on the 2025 edition is currently in progress. 
10
121

Page 122

3.6. As part of the SEA process, the Council is required to formally consult with the
statutory Consultation Authorities (Historic Environment Scotland, NatureScot and
the Scottish Environment Protection Agency). This is facilitated by the Scottish
Government’s SEA Gateway. 
3.7. In March 2009, the Executive Committee delegated authority to the Chief Executive
to make determinations on whether a Council led plan is exempt from SEA or if a full
SEA would be carried out. In January 2020, the Chief Executive delegated this
authority to the Executive Director (Community and Enterprise Resources). These
determinations are collated by the SEA Gateway and issued to the statutory
Consultation Authorities for consultation and agreement. This process is facilitated
within the Council by the Planning Officer (SEA). 
3.8. Although it is not a legal requirement to report on SEA progress to committee, it is
considered good practice to keep members informed.   
4. Progress in Carrying Out SEAs
4.1. The Council has a statutory duty to consider and carry out an SEA for all its policies,
plans, programmes and strategies as they are being developed or refreshed. During
2024/2025, a number of Council led plans were subject to SEA. 
4.2. The SEA Act requires the Council to assess whether plans are within the scope of
the legislation and whether SEA is required. This can be considered through either
Pre-screening or Screening. 
4.3. Four assessments of plans were completed at the Pre-screening stage. At this
stage, the Council informed the Scottish Government’s SEA Gateway of their opinion
that these plans were exempt from SEA as their implementation would have no or
minimal effect on the environment. These are detailed in Table 1. 
Table 1: Pre-screening completions 2023/2024
Lead Resource Plan
Social Work  Community Justice Partnership Outcome Improvement
Plan
Housing and Technical Kitchen Replacement Programme
Social Work Integrated Joint Board Strategic Plan
Social Work Carers Strategy 
4.4. Three plans were finalised at Screening stage. A formal determination was made
and agreed by the Consultation Authorities that further SEA work was not required
for them. These are detailed in Table 2. 
Table 2: Screening completions 2023/2024
Lead Resource Plan
Community and
Enterprise
Placemaking Guide
Community and
Enterprise
Air Quality Action Plan
Community and
Enterprise
Air Quality Strategy  
122

Page 123

4.5. In March 2025, a Screening Report was prepared and submitted to the SEA
Gateway for the Hamilton and East Kilbride Town Centre Masterplans. The
Consultation Authorities agreed that a full SEA was not required. A Screening
Determination has been issued to that effect. 
4.6. During 2024/2025, a draft Scoping Report, which sets out how the environmental
assessment is to be conducted, was prepared for the forthcoming Local
Development Plan 3. This Scoping Report will be finalised following a workshop to
be held on 22 May 2025 and submitted to the SEA Gateway for consideration by the
Consultation Authorities in June 2025. 
4.7. Two plans, the forthcoming Local Transport Strategy and the New Lanark World
Heritage Site Management Plan, have undergone strategic environmental
assessment during 2024/2025. This work will be finalised in May 2025 and the
findings will be set out in an Environmental Report. The Environmental Reports will
be submitted to the SEA Gateway and will be subject to public consultation
alongside both the Local Transport Strategy and New Lanark World Heritage Site
Management Plan in summer 2025. 
4.8. The final stage of the SEA process is the preparation and submission of a Post
Adoption Statement to the SEA Gateway. The Post Adoption Statement sets out the
key findings from the SEA and how these have been taken account of in the final
adopted plan. In 2024/2025, no Council led plans required to undergo this stage of
the SEA process. 
4.9. In 2025/2026, SEA work will focus on a range of Council led plans, including the
forthcoming Local Development Plan 3. 
4.10. The Strategic Environmental Assessment work continues to promote the protection
and enhancement of the South Lanarkshire environment for our people and
communities. 
5. Employee Implications
5.1. SEAs are resourced by existing staff. 
6. Financial Implications
6.1. SEAs are resourced within existing budgets. 
7. Other Implications
7.1. Failure to make a formal determination in relation to a plan could result in the SEA
process having to be restarted leading to a delay in the development of the plan. 
Council actions in relation to SEA are also open to legal challenge and it is,
therefore, important to ensure compliance with the legislation.   
8. Climate Change, Sustainability and Environmental Implications
8.1. Strategic Environmental Assessment is a valuable tool for the Council and partners
in strategic planning. It safeguards South Lanarkshire’s natural and built environment
and is a useful tool to help address both the climate and nature emergencies.   
123

Page 124

9.  Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
significant change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. The report is for information only and consultation on its contents is not required. 
David Booth
Executive Director (Community and Enterprise Resources) 
8 May 2025 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Thriving business, fair jobs and vibrant town centres 
Previous References
 Executive Committee, 25 March 2009 
List of Background Papers
 South Lanarkshire State of the Environment Report 2023 (approved by the Executive
Committee 26 June 2024)
 South Lanarkshire Council Sustainable Development and Climate Change Strategy
2022 - 2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Jennifer Murphy
Advanced Planning Officer (Strategic Environmental Assessment)
Email: jennifer.murphy@southlanarkshire.gov.uk
124