Democracy Spraffa

Agenda Document Pack - Executive Committee - 20/05/2026

South Lanarkshire Council · 20 May 2026
Back to Executive Committee — 20 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 12 May 2026 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 20 May 2026
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Lynsey Hamilton, Susan Kerr, Ross Lambie,
Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Davie McLachlan, Richard Nelson,
Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, David Shearer, Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin Hose,
Cal Johnston-Dempsey, Hugh Macdonald, Kenny McCreary, Elaine McDougall, Mark McGeever,
Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 1 April 2026
submitted for approval as a correct record.  (Copy attached) 
5 - 10 
Monitoring Item(s) 
3 Update to Funding
Report dated 15 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
11 - 14 
Item(s) for Decision 
4 2026/2027 Investments – Updates
Report dated 13 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
15 - 28 
5 Review of Petitions Process
Report dated 5 May 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
29 - 44 
6 Statutory Review of the Byelaws Prohibiting the Consumption of Alcohol
in Designated Public Places
Report dated 30 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
45 - 50 
7 Representation on International Children’s Games
Report dated 22 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
51 - 52 
8 Recommendation Referred by Finance and Corporate Resources
Committee
Report dated 6 May 2026 by the Chief Executive.  (Copy attached) 
53 - 56 
9 Representation on Outside Bodies – Business Loans Scotland
Report dated 15 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
57 - 58 
10  South Lanarkshire’s State of the Environment Report 2025
Report dated 28 April 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
59 - 70 
11  The Housing Promise
Joint report dated 5 May 2026 by the Director, Health and Social Care and
Executive Director (Housing and Technical Resources).  (Copy attached) 
71 - 76 
12  Land and Property Transfers and Disposals
Report dated 27 April 2026 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
77 - 82
2

Page 3

13  Summer of Sport
Report dated 29 April 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
83 - 88 
14  Amendments to Memberships of Committees
Report dated 30 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
89 - 90 
Item(s) for Noting 
15  Update on Corporate Asset Management Plan
Report dated 24 April 2026 by the Executive Director (Housing and Technical
Resources).  (Copy attached) 
91 - 110 
16  Integration Joint Boards - Extension of Voting Rights
Report dated 29 April 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
111 - 114 
Urgent Business 
17  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 1 April 2026 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Andrea Cowan, Councillor Margaret Cowie (substitute for Councillor Margaret B
Walker), Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller, Councillor Elise Frame,
Councillor Lynsey Hamilton, Councillor Susan Kerr, Councillor Ross Lambie, Councillor Eileen Logan,
Councillor Katy Loudon, Councillor Ian McAllan, Councillor Catherine McClymont, Councillor Lesley
McDonald, Councillor Davie McLachlan, Councillor Richard Nelson, Councillor Norman Rae,
Councillor Mo Razzaq, Councillor Kirsten Robb, Councillor John Ross, Councillor David Shearer 
Councillors’ Apologies:
Councillor Margaret Cooper, Councillor Margaret B Walker 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; T Little, Head of Communications and Strategy
Community and Enterprise Resources
K Carr, Executive Director
Education Resources
L McRoberts, Executive Director
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; T Slater, Administration Adviser; I
Strachan, Head of Administration and Legal Services
Housing and Technical Resources
S Gibson, Executive Director
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 4 March 2026 were submitted for
approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
5

Page 6

3 Revenue Budget Monitoring for Period 12 - 1 April 2025 to 20 February 2026 and
Probable Outturn 
A report dated 11 March 2026 by the Executive Director (Finance and Corporate Resources) was
submitted on the overall financial position of the General Fund Revenue Account and the Housing
Revenue Account for the period 1 April 2025 to 20 February 2026 and the projection for the year
to 31 March 2026. 
The report and associated appendices:- 
 summarised the 2025/2026 Probable Outturn position for the Council’s General Fund
Revenue Account to 31 March 2026, following agreed transfers to reserves, which showed
a breakeven position
 provided details of the position on the General Fund Account and the Housing Revenue
Account respectively for the period 1 April 2025 to 20 February 2026
 advised that the Council was due to receive a share of the reserves that had been
accumulated by Clydeplan, following its termination on 31 March 2025
 provided the Housing Revenue Account position 
The Executive Director (Finance and Corporate Resources) responded to a member’s questions
in relation to various aspects of the report. 
The Committee decided: 
(1) that the Council’s breakeven Probable Outturn position after transfers to reserves, as
detailed in section 4 of the report, be noted; 
(2) that the current forecast on the General Fund Revenue Account for 2025/2026, as detailed
in section 5.1 of the report, and the actual spend as at 20 February 2026, as detailed in
appendices 1 and 2 of the report, be noted; and 
(3) that the projected breakeven position on the Housing Revenue Account for 2025/2026, and
the actual spend as at 20 February 2026, as detailed in section 6 and Appendix 3 of the
report, be noted. 
[Reference: Minutes of 4 March 2026 (Paragraph 3)] 
4 Capital Budget 2025/2026 and Monitoring for Period 12 - 1 April 2025 to 20
February 2026 
A report dated 11 March 2026 by the Executive Director (Finance and Corporate Resources) was
submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April 2025 to 20 February 2026. 
The revised programme for the General Fund for 2025/2026, as summarised in Appendix 1 to the
report, was £67.712 million.  This included carry forward projects and previous adjustments
approved by this Committee.  The forecast for the financial year was £65.962 million and actual
spend incurred as at 20 February 2026 totalled £42.034 million.  Actual funding received up to 20
February 2026 was £43.620 million.  This was detailed in Appendix 2 to the report. 
The revised Housing Capital Programme for 2025/2026 amounted to £87.740 million.  Programme
funding for the year also totalled £87.740 million.  The funding sources were detailed in Appendix
3 to the report.  Budget for the period amounted to £63.563 million and, as at 20 February 2026,
£63.563 million had been spent.  
6

Page 7

The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 and
2 of the report, and the Housing Capital Programme, as detailed in Appendix 3 of the report,
as at 20 February 2026, be noted; and 
(2) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 4 March 2026 (Paragraph 4)] 
5 Update to Funding 
A report dated 3 March 2026 by the Executive Director (Finance and Corporate Resources) was
submitted on additional funding, totalling £0.150 million, which had been made available to the
Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2025/2026 
(£m) 
Community and Enterprise 0.150 
Total 0.150 
The Committee decided: that the report be noted. 
[Reference: Minutes of 4 March 2026 (Paragraph 5)] 
6 Pride in Place Programme – Hamilton Town Centre 
A report dated 18 March 2026 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the Pride in Place Programme in respect of the appointment
of the Independent Chair and Neighbourhood Board. 
The recruitment process for the Independent Chair commenced at the end of January 2026 and
6 expressions of interest were received.  Following shortleeting and interview, Ronnie Smith was
appointed as the Independent Chair, and this was notified to the UK Government on 31 March
2026. 
The Independent Chair, supported by the local MP, would now lead on the recruitment of the
Neighbourhood Board, ensuring an inclusive and representative selection of people from across
the community. 
Information was provided on the:- 
 criteria that would be followed in agreeing the Board membership
 process for seeking expressions of interest for Board membership
 governance arrangements
 timescales for completion of Board membership and submitting the Pride in Place Plan for
Hamilton Town Centre to the UK Government  
7

Page 8

A further report would be submitted to this Committee on 24 June 2026 to approve the
Neighbourhood Board, which must be established by 17 July 2026. 
Councillor Fagan, seconded by Councillor Convery, moved the recommendations in the report. 
Councillor Clark, seconded by Councillor Shearer, moved as an amendment that a request be
made by the Chief Executive to the new Chair of the Neighbourhood Board for all 3 Ward 17
councillors to be members of the Board. 
On a vote being taken using the electronic voting system, 15 members voted for the motion and
13 voted for the amendment.  The motion was declared carried. 
The Committee decided: 
(1) that the appointment of Ronnie Smith as Independent Chair for the Pride in Place
Programme for Hamilton Town Centre – An Anchor for the Hamilton Area be noted; 
(2) that the process for the recruitment of the Hamilton Town Centre Neighbourhood Board, as
set out in section 5 of the report, be approved; and 
(3) that the timeline and next steps, as set out in section 6 of the report, be noted. 
[Reference: Minutes of 4 February 2026 (Paragraph 9)] 
7 Land and Property Transfers and Disposals 
A report dated 25 February 2026 by the Executive Director (Housing and Technical Resources)
was submitted on proposed actions in respect of land and property transactions. 
The recommendations had been made in terms of agreed procedures for dealing with surplus
land and property. 
Councillor Nelson, seconded by Councillor Clark, proposed that the decision in relation to land
adjacent to 51 Machan Road, Larkhall be continued to a future meeting to allow further
engagement with all local members, clarification on pedestrian and road safety implications
including any mitigation measures, consideration of the impact on remaining open greenspace
and a further explanation regarding previous interest in the land. 
Following discussion, the proposal was agreed by the Committee. 
The Committee decided: 
(1) that the land detailed in Appendix A, with the exception of land adjacent to 51 Machan Road,
Larkhall, be declared surplus to Council requirements; 
(2) that it be noted that the land declared surplus to requirements would be the subject of
negotiated transactions; and 
(3) that the decision in relation to land adjacent to 51 Machan Road, Larkhall be continued to a
future meeting. 
8 After School Provision in South Lanarkshire 
A report dated 12 March 2026 by the Chief Executive was submitted providing a timeline for
reporting on after school provision in South Lanarkshire. 
8

Page 9

At the full Council meeting on 11 March 2026, the following motion, as amended, was agreed:- 
‘The Council notes the range of after-school care provided across South Lanarkshire, including
provision on the Council estate, and considers that good-quality after-school care can enhance
communities, support families and improve outcomes for children and young people. 
The Council further notes the range of providers and models of provision available across
Scotland, including not-for-profit provision. 
The Council commits to working with partners, including South Lanarkshire Leisure and Culture,
to create a supportive environment for after-school provision to emerge across South Lanarkshire,
subject to legal and commercial constraints, and requests that a report be brought forward to a
future meeting of the Executive Committee addressing:- 
1. The extent and mix of after school provision across South Lanarkshire. 
2. Current and emerging issues in the development of after school provision. 
This should include consideration of the following; 
- A plan for engagement with our employability partners such as Routes to Work South
for example, who offer “Making it Work for Parents”, to understand more about the
barriers faced by parents, and how services can and do support them. 
- Consideration of the work and research of agencies such as One Parent Families
Scotland and Parenting Across Scotland, to understand more about the particular
needs of one-parent families. 
- Inclusion of the experiences of childminders, including our partnership childminders,
to recognise their place in the after-school care landscape 
- Exploration of how any work in this area could tie into the wider Marmot Place work
being carried out by the Council, both in terms of data-gathering and strategic planning,
since research has shown that there are socioeconomic variations in the use of after-
school provision.” 
3. Steps the Council can take to support the development of after school provision, including
on the Council-owned estate. 
4. The potential for Community Wealth Building approaches to support new after-school
provision. 
Any report which recommends engagement exercises to understand the after-school landscape
in South Lanarkshire must clearly state how the views and lived experience of children and young
people will be captured, to meet our obligations to include their voices in the Council’s planning
and delivery of services.’ 
The Chief Executive undertook to provide an update to this Committee on the timeline, which was
outlined at paragraph 4.2 of the report. 
Following a member’s request, it was agreed that an interim update would be provided to
members, either through a report to committee, or a briefing note, on the nature of the engagement
with young people, prior to the intended date for the submission of initial findings in October 2026.  
9

Page 10

The Committee decided: 
(1) that, further to the motion, as amended, agreed at the full Council meeting on 11 March
2026, the timeline for reporting on after school provision in South Lanarkshire be noted; and 
(2) that an interim update be provided to members on the nature of engagement with young
people prior to the submission of the initial findings in October 2026. 
[Reference: Minutes of South Lanarkshire Council of 11 March 2026 (Paragraph 8)] 
9 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (1 April 2026)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £2.118 million, detailed in appendices 1 and
2, be noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in appendices 1 and 2 of the report. The
report details additional funding that has been reported by Resources as part of the
additional resources’ notification process, as well as any additional funding that has
increased the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £1.368 million has been identified across 2026/2027
(£1.044 million) and 2027/2028 (£0.324 million). This is detailed in Appendix 1.  
5.2. Additional Capital funding of £0.750 million has been identified for 2026/2027. This is
detailed in Appendix 2. 
5.3. Resource budgets will be updated to reflect this additional funding.  Where
appropriate, details of spending plans will be presented to Resource Committees for
approval.  
3
11

Page 12

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Additional Funding Grant Awards 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
12

Page 13

Appendix 1 
Additional Revenue Funding 
Resource  Description  2026/2027
£m 
2027/2028
£m 
Total
£m 
Method
Communities
and
Enterprise
Summer of Sport
This one-off grant funding is to be used
to invest in providing free or low-cost,
inclusive opportunities for children and
young people aged 3–26 to get active,
stay active and improve their lives, with
a particular focus on reducing barriers
to participation and addressing
poverty-related inequality. 
The investment is designed to support
activity during summer 2026, including
the period around the Glasgow 2026
Commonwealth Games, and to create
a lasting impact through to March 2027
by strengthening pathways into
sustained participation in school, club
and community sport. 
The South Lanarkshire Leisure and
Culture Programme is included in a
separate report to this Committee (20
May 2026). Activity includes World
Cup inspired football sessions,
Commonwealth Games multi-sports,
Golf, Ice Skating and Swimming. 
0.713 - 0.713 Sports
Scotland
Education The Hidden Stakes
This is a programme focused on
preventing gambling-related harms
among Children and Young People
and families through targeted
education (P7–S4), capacity-building
for staff and volunteers,
awareness-raising with parents, and
early-intervention approaches such as
peer-support groups delivered both in
person and online. 
0.331 0.324 0.655 Scottish
Government 
TOTAL REVENUE FUNDING 1.044 0.324 1.368 
13

Page 14

Appendix 2 
Additional Capital Funding 
Resource  Description  2026/2027
£m 
2027/2028
£m 
Total
£m 
Method
Communities
and
Enterprise
Glassford Village Hall
Redevelopment
Refurbish and extend the existing
Glassford Community Hall in rural
South Lanarkshire creating a larger,
welcoming space that will be the heart
of the community. 
This funding was awarded via the
Scottish Government Regeneration
Capital Grant Fund, which requires the
lead applicant to be a Local Authority. 
Glassford Community Group will
deliver the project with the Council
passing on the funding after verified
spend is made by the group.   
0.750 - 0.750 Scottish
Government 
TOTAL CAPITAL FUNDING 0.750 - 0.750 
14

Page 15

Report
Agenda Item 
Report to: Executive Committee
Date: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: 2026/2027 Investments – Updates 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide information on the 2026/2027 Investment plans and detail the process
for each of the following investment areas:  Galas and Festivals, Third Sector and
Local Action Fund 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the details of the 2026/2027 Investments, as detailed in section 4, be noted;
(2) that information on the Galas and Festivals Fund, as outlined in section 5, and
the Third Sector allocation, as detailed in section 6, be noted; and
(3) that the proposed approach for the Local Action Fund, as outlined in section 7,
be approved. 
3. Background
3.1. As part of the Budget setting process on 25 February 2026, an amendment was
approved which allocated recurring investment monies of £3.534 million and one-off
investment monies of £33.300 million. This paper will provide a summary of the
investment proposals (section 4) and will detail the specific distribution arrangements
for three of the investment areas namely Galas and Festivals, Third Sector and Local
Action Fund (sections 5 to 7). 
4. Investment Monies 2026/2027 Update
4.1. As noted in section 3.1, the total recurring Investment Budget available for 2026/2027
is £3.534 million and one-off monies totalling £33.300 million.  These are summarised
in Table 1:   
Table 1: 2026/2027 Investments
Recurring Revenue Expenditure £m
Spend on our Grounds Service   1.700
Reinstating a second hedge cut  0.144
Expand Business grants    0.400
Free swimming for under 16s    0.250
Addition to devolved school budget   0.500
Funds to third sector   0.300
Reinstate citizens advice funding   0.040
Galas and festivals fund    0.200
Total Recurring Revenue Expenditure 3.534  
4
15

Page 16

One-Off Investments £m
Investment in environment and infrastructure   12.000
Supporting and developing Local Business   3.500
Investing in energy efficiency  1.000
Estate improvements    0.500
Care Experienced Young People: Accommodation    0.500
Visual equipment for schools   2.100
Additional Support Needs school estate improvements   0.500
Country Parks   7.300
Outdoor Investment   4.000
Local Action Fund  1.000
Culture Strategy  0.800
Community Engagement Team  0.100
Total One-Off Investments 33.300 
4.2. All of the recurring monies of £3.534 million will spend on an annual basis commencing
in 2026/2027.  Table 2 summarises the £33.300 million one-off monies and the initial
indications of how this is expected to spend across the next 3 years. 
Table 2:  Spend Across Years (One-Off) 
2026/2027 2027/2028 2028/2029 TOTAL 
£m £m £m £m
Project Spend 12.130 9.555 11.615 33.300 
4.3. A high-level summary of the recurring investments is provided in Appendix 1, with the
One-Off investments in Appendix 2. 
4.4. Following the approval of these Investments, 2 separate reports were provided to
Committee, which gave further information on the investments.  The paper to the
Community and Enterprise Resources Committee (17 March 2026) focussed on key
Infrastructure and Investment activity for that Resource, highlighting how the spend
will improve services, infrastructure and community outcomes, while the Housing and
Technical Resources paper (18 March 2026) provided an overview of the One-Off
Investments allocated to the Central Energy Efficiency Fund and the Estate
Improvement Fund. 
5. Galas and Festivals Fund (£0.200m)
5.1. The total Galas and Festivals funding available is £0.275 million.  This includes the
£0.200 million of new investment monies, as well as in-kind support previously
available to support galas (£0.055 million) and the allocation remaining for Lanimers
and Landemer Day (£0.007 million) and all other Gala grants (£0.013 million), as
outlined in the Third Sector Partnership Review to Executive Committee in November
2025. 
5.2. The in-kind budget previously available to support galas (£0.055 million of in-kind
support) was not taken as a saving and sits within the Community and Enterprise
Resources’ budget.  
16

Page 17

5.3. The purpose of the fund is to recognise that each community has its own history,
identity and traditions they wish to share and celebrate.  The funding invests in the
Council’s Connect Plan commitment to deliver caring, connected and sustainable
communities and will directly contribute to the outcome: More people reporting a
strong sense of community.  The investment ensures an equitable approach to grant
funding for these local events through the establishment of a new open process Galas
and Festivals Grant Programme.  The Galas and Festivals grant programme is set out
in line with the Council’s new Grant Policy. 
5.4. Any constituted community group or organisation which provides community benefit
with public liability insurance for their activities is eligible to apply. Due diligence will
be undertaken to verify their group and bank account in line with the grant policy. 
5.5. Organisers of events are able to bid for this new funding which enables the Council to
widen the number and range of galas and festivals that are supported and bring more
parity to the support being made available for different communities. 
5.6. The fund will support place based, geographic communities within South Lanarkshire
to run local community events throughout the year that are open and inclusive of all
members of that community.  A place is defined as a town, village or neighbourhood. 
5.7. Grants of up to £5,000 will be offered for each event which will equate to approximately
40-45 events that can be funded. The number of events funded depends on how many
applicants request the full amount and requested levels of in-kind support for the
events. 
5.8. As noted in section 5.2, in-kind support has previously been available from the
Council’s Grounds/Roads services.  This previously provided support to local events
was valued at £55,000 per year and, while this is now part of the overall fund of
£275,000, it is intended that the previous support continues, and any additional in-kind
support requested will be charged against the overall fund. 
5.9. The fund opened for applications on 30 April 2026, with a view to awarding grants by
29 May 2026, in time for the summer gala season.  It is proposed that if additional
funds remain after this first exercise, a second run of the fund would open in August
for autumn and winter events, although these could be bid for in the first run too.  
6. Third Sector (£0.300m)
6.1. This permanent funding is to reflect the Council’s commitment to work to make South
Lanarkshire the best environment for the local third sector to operate in Scotland, by
supporting security of funds for the third sector. Officers will continue to work with
VASLan (as the Third Sector Interface) and the sector to build on this investment to
boost funding available. 
6.2. In line with the Third Sector Partnership Agreement approved by Executive Committee
in November 2025, discussions have taken place with VASLan, as South
Lanarkshire's Third Sector Interface, as to how best to utilise the investment approved
in the 2026/2027 budget. These discussions have included how VASLan might build
on the monies available by attracting match funding from national funding
organisations, entrepreneurs and benefactors.  
17

Page 18

6.3. Discussions are underway around a South Lanarkshire Third Sector Fund where the
Council will work with VASLan to promote the fund, and invite and assess applications,
and make recommendations for grants, which will be announced and publicised jointly,
with payments issued by the Council. 
6.4. Joint terms of reference are being developed which will establish how the fund will be
governed, as well as development of criteria for applications and scoring mechanisms,
and the make-up of scoring panels. All grants awarded will follow the terms agreed in
the Third Sector Grants Policy, which was also approved at Executive Committee in
November 2025, and will be listed on the South Lanarkshire Council online Grants
Register. 
6.5. The South Lanarkshire Third Sector Fund will build on the Community Can Do Fund,
through which £0.200 million in grants was approved by Finance and Corporate
Resources Committee in February 2026.  This fund was heavily over-subscribed, with
92 applications seeking a total of £1.126 million in funding. 
6.6. Given the scale of demand identified in that exercise, which took place as recently as
December 2025 and January 2026, and the timescales to agree the joint terms of
reference, it is proposed that the applications received and scored through the
Community Can Do Fund should be used to disperse the £0.300 million available from
the South Lanarkshire Third Sector Fund for 2026/2027 only. The Council, in
discussions with VASLan, will review those applications who scored highest without
receiving funding to ensure the condition within 6.7 below are met prior to inviting the
applicant to update and confirm details of their bid.  Following the same process that
was used for the original funds, we would bring back to Finance and Corporate
Resources Committee the list of recipients for approval.   
6.7. To ensure a broad spread of the funding available to the third sector in south
Lanarkshire, we would not offer funding to applicants who are already in receipt of
Council or community mental health or wellbeing funding for similar provisions and
services. 
6.8. Beyond 2026/2027, the South Lanarkshire Third Sector Fund will then operate fully as
described in section 6.4 above, in line with the terms or reference, for 2027/2028
onward. 
7. Local Action Fund (LAF) (£1.000m)
7.1. The proposed approach for the 2026/2027 LAF monies builds on that adopted in the
previous financial year and that for 2026/2027, the Council would build on existing
knowledge about the priorities expressed by local communities.   
7.2. This includes the 10 Neighbourhood Plans which, following consultation, list the
priorities for Blantyre, Burnhill, Cambuslang East, East Kilbride South, Fernhill,
Hamilton South, Hillhouse, Udston and Burnbank, Springhall and Whitlawburn,
Strutherhill and Birkenshaw, and Whitehill. These priorities have been engaged on
annually with a wide range of stakeholders through Participatory Budgeting.  
18

Page 19

7.3. Not all areas have Neighbourhood Plans, and those plans that do exist are generally
not established on a single or whole ward basis. However, additional knowledge of
local priorities can be gathered from the discussions of Community Planning
Partnerships. There are four locality partnerships, for Cambuslang/Rutherglen,
Clydesdale, East Kilbride and Hamilton, where community representatives,
Neighbourhood Planning areas, community councils and other community bodies
come together to discuss common issues and report to the Community Planning
Partnership on the discussions and look at improvement actions/options. 
7.4. The Community Engagement Team can provide elected members with an analysis of
the local views, together with other community feedback received through stakeholder
groups. Officers would be available to support elected members in each ward on how
they use this information. Members may agree their own proposals but if not, then
further engagement with stakeholder groups could be carried out to provide a list of
potential LAF Fund projects. Appropriate communication with the wider public on the
funding and process will be made available 
7.5. Based upon that feedback, ward members would then finalise and submit their
proposals for review by officers, to ensure deliverability within the agreed budget, and
for compliance with Council policy and procedure. Ward members would also be free
to engage in their own community engagement to inform their LAF proposals, alone
or with other ward members. Subject to those checks, suggestions will be reported to
the Executive Committee for consideration and approval. 
7.6. The following additional guidance will be provided to members: 
 as with last year, in line with the Council’s multi-member ward guidance, ward
members will be encouraged to discuss possible suggestions with their fellow
ward members and, if able, to agree a single proposal for their ward
 in the usual way, Council procedures/policies need to be followed for use of the
LAF funding, including the Standing Orders on Contracts, the Financial
Regulations and the Scheme of Delegation
 the proposals could be for capital or revenue spend. Given the funds are one off,
members should look to spend on areas where recurring spend is not required
 suggestions should ideally be capable of commencing delivery in 2026/2027
 if a member was considering suggesting that the LAF be used for the issuing of
a grant, then officers can assist in ensuring that the issuing of the grant complies
with the Code of Guidance on Funding External Bodies and Following the Public
Pound, as well as the Council’s Grants Policy
 members are encouraged to contact relevant senior officers in advance of the
closing date should they have any questions on possible suggestions, estimated
costings and whether they would be appropriate for the LAF 
7.7. Joint working between ward members is recommended to arrive at consensus on
proposed projects.  If there is more than one submission per ward (if consensus cannot
be reached) then all forms submitted for a ward will be shared with all ward members
following the closing date for suggestions. As noted above, suggestions will be
reported to the Executive Committee for consideration and approval.  In this way, the
Council’s investment will be shown to be focused on community plans and priorities,
informed by communities and local members.  
19

Page 20

7.8. Starting with this report to the Council’s Executive Committee on 20 May 2026, it is
proposed that the LAF would be taken forward as outlined in the timetable below.  . 
Following the allocation of funds this year, officers review the process to inform any
future iterations of funding: 
Executive Committee 20 May 2026
Guidance issued to members on Local Action Fund for 2026/27 21 May 2026
Members briefing session on process and existing Community
Priorities shared with Ward Members
w/c 25 May 2026
Engagement with Community Partnerships if necessary  Through June 2026  
Members’ proposals to be submitted to officers 14 August 2026
Report to Executive Committee with spend proposals  16 September 2026
Future reporting as required to Executive Committee for any
remaining spend proposals
As required 
8. Employee Implications
8.1. None. 
9. Financial Implications
9.1. As detailed in sections 4 to 7 of the report. 
10. Climate Change, Sustainability and Environmental Implications
10.1. Any implications for climate change, sustainability or the environment in terms of the
items covered in this report are included in the Budget Investments IIA (noted in
section 12). 
11. Other Implications
11.1. The main risk associated with any of the Investment opportunities is that there is an
overspend.   
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.  However, an IIA was completed for the Budget Investments: Budget
Amendment 2026 IIA Plans and policies - South Lanarkshire Council 
12.2. There is also no requirement to undertake any consultation in terms of the information
contained in this report – section 7.4 details the process for the LAF and highlights the
use of existing analysis of the local views and other community feedback received
through stakeholder groups. Members may agree their own proposals based on this
information, but if not, then further engagement with stakeholder groups could be
carried out to provide a list of potential LAF projects. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
13 April 2026  
20

Page 21

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
21

Page 22

Appendix 1 
2026/2027 Recurring Investments 
1.1. A summary of each of the recurring investments is provided below for information. 
1.2. Spend on Our Grounds Service (£1.700m): Increased investment provides an uplift
in the Council’s capacity to manage and improve our streets and community green
spaces. Additional frontline staff (increased arboriculture team, town centre/high
footfall teams and introduction of apprenticeships) will allow for more regular
maintenance cycles, quicker response times, and greater attention to detail across
parks, verges, and shared open spaces:  This will help deliver cleaner, safer, and more
welcoming environments, improving the visual appearance of neighbourhoods and
contributing to local pride. The enhanced service will also support biodiversity, better
manage seasonal growth, and help ensure that green spaces are accessible and
enjoyable for all residents throughout the year. Plans are now progressing for the
recruitment of additional staff. 
1.3. Reinstating a second hedge cut (£0.144m): The reinstatement of an annual second
hedge cut is expected to provide noticeable improvements to the look and feel of public
areas. A second cut which will be undertaken will enhance visibility along footways
and roads, supporting road safety and pedestrian confidence. It also prevents hedges
from becoming overgrown, reducing obstructions, and ensuring that paths remain
accessible. Hedge cutting is generally undertaken during bird nesting season and
operatives are expected to check for nesting birds before they undertake any work on
hedges or trees. If a nest is found, then work would not start, or it would cease at that
location until the birds had left later in the season. The re-introduction of the second
hedge cut would mean the first cut would be undertaken over June and July, and the
second cut over September and October. This additional maintenance cycle improves
overall appearance and helps keep communities tidy, particularly during peak growing
seasons. 
1.4. Expand Business grants (£0.400m): The expansion of business grants will provide
a boost to the local economy. At present grant awards are up to £5,000, increasing
this to £20,000 will support a wider range of businesses to invest in growth,
modernisation, and sustainability measures. This may include upgrading premises,
adopting digital technologies, purchase of equipment or supporting expansion into
new markets. Increased access to funding strengthens the resilience of local
enterprises, helps attract and retain jobs and contributes to the long-term economic
vitality of South Lanarkshire. It will also further connect businesses with Business
Gateway. 
1.5. Free swimming for under 16s (£0.250m): Working in partnership with South
Lanarkshire Leisure and Culture, the investment will provide free swimming for all
under 16s. This initiative removes financial barriers to participation and encourages
children and young people to engage in regular physical activity. Increasing access to
swimming supports physical wellbeing, builds confidence in water, and promotes
healthy habits from an early age. It also aligns with wider ambitions to improve health,
reduce inequalities in access to sport and create more inclusive leisure opportunities
for families across the area.  
22

Page 23

1.6. Addition to devolved school budget (£0.500m): This will provide for extra devolved
school classroom budget for all our schools in South Lanarkshire, increasing the ability
for schools to provide essential supplies and equipment and learning experiences
including outdoor learning, and also resources and supplies required for children with
additional support needs. Investment monies will be devolved to schools budgets
using current school roll distribution and spent through normal DSM procedures
managed at school level. 
1.7. Funds to Third Sector (£0.300m): Permanent funding to provide security of funds for
the third sector. We will continue to work with the sector to build on this investment to
boost funding available.   
1.8. Reinstate Citizens Advice Funding (£0.040m): Reinstate the Citizens Advice
Bureau funding to previous levels, removing the planned reduction in 2026/2027. Each
CAB will receive £0.010 million to replace the planned reduction in core funding for
2026/2027 allowing continuation of current service levels. 
1.9. Galas and Festivals Fund (£0.200m): Each community has its own history, identity
and traditions. The investment ensures an equitable approach to grant funding for local
community events.   
23

Page 24

Appendix 2 
2026/2027 One-Off Investments 
1.1. A summary of each of the one-off investments is provided for information.  Each
investment is taken in turn.   
1.2. Investment in Environment and Infrastructure (£12.000m): Investment in roads
and environmental infrastructure, complementing existing capital funding streams will
provide a dedicated funding package for key asset groups. Investment areas include
street lighting, traffic signal and pedestrian crossings, bridges, open spaces, signage,
underpasses, drainage, and flood prone areas. Specific projects and programmes are
being developed and prioritised in line with their known condition and relevant Asset
Management Plans priorities and are expected to be delivered over the next 3 years.
This investment is expected to ease pressure on other investment areas (e.g.
carriageways), in turn, allowing greater investment in these areas also. The investment
will strengthen local infrastructure, improve safety, and create more pleasant and
resilient environments. Collectively, this investment will result in safer, better
maintained, and more sustainable environments for residents, businesses, and
visitors. 
1.3. Supporting and Developing Local Business (£3.500m): Support for local business
growth is strengthened through a total investment of £3.5m. £1.0m is identified for a
new business grant programme which will target the retrofit of private sector industrial
properties enabling companies to modernise properties and invest in decarbonisation
and energy efficiency with grant awards of up to £50,000. This investment will help
businesses remain competitive while contributing to wider net zero ambitions.
Guidance for applicants is currently being prepared, and the business grant application
portal is being revised and will be launched in spring 2026. 
1.4. Investment in improving commercial property stock both Council owned and privately 
held supports the development of modern, fit for purpose business environments. 
£2.0m funding to allow for £11.0m of investment for the development of new
commercial spaces will help meet growing demand locally, allowing businesses to
start up and expand within South Lanarkshire rather than relocating elsewhere. These
combined measures stimulate economic growth, attract new investment, create
employment opportunities, and help sustain a thriving local business base. A feasibility
study will be undertaken to scope out development opportunities for the Council’s
Canderside site in Larkhall as well as other sites across the area. 
1.5. £0.5m is also identified for improvements to the Council’s business centres which will
also consider the delivery model for providing this service. 
1.6. Investing in Energy Efficiency (£1.000m): Investment to expand the energy
efficiency programme (CEEF - Central Energy Efficiency Fund) investing to improve
energy efficiency in Council facilities and allowing a recurring investment pot to deliver
future projects.  To allow detailed assessment and feasibility work to be conducted, as
well as building in sufficient time to accommodate the procurement process, it is noted
that spend is likely to be profiled as follows: £0.350 million in 2026/2027 and £0.650
million in 2027/2028.  
24

Page 25

1.7. Property Services have considered specific projects across education, leisure and
corporate assets within the two-year period, with the aim of maximising the benefits
achieved from the enhanced level of funding now available, these are detailed in the
tables below along with the indicative cost and the indicative payback period in years.   
Project Indicative
cost
£m
Indicative
payback in
years
PV installation plus BEMS upgrades  
Hamilton Palace Sports Ground 0.074 5.7
Lifestyles Fairhill 0.081 4.7
Lifestyles Stonehouse 0.076 4.9
Murray Owen Centre 0.081 6.3
Sub Total 0.312     
LED lighting and controls plus BEMS upgrades
Burgh Primary School 0.100 9.6
Cathkin Primary School 0.110 5.8
Chatelherault Primary School 0.110 6.0
Glenlee Primary School / Hamilton School for the Deaf 0.100 7.8
Netherburn Primary School 0.058 8.4
St Cuthbert's Primary School 0.105 8.7
St John's Primary School – Hamilton 0.105 7.8
Sub Total 0.688 
TOTAL 1.000 
1.8. Progress and outcomes relating to CEEF is reported to this Committee as part of the
Resource Plan, as well as to the Climate Change and Sustainability Committee as part
of the Local Heat and Energy Efficiency Strategy and Sustainability and Climate
Change Strategy updates. 
1.9. Estate Improvements (£0.500m): Housing Services co-ordinate an annual Estate
Improvement Budget as part of the wider Housing Investment Programme. The budget
is £0.080 million, allocated evenly across each of the four housing divisions and spent
on priority projects identified in conjunction with tenants. The funding is allocated to
small scale improvement projects on land or assets owned by the Housing Revenue
Account. 
1.10. Alignment with the council’s Participatory Budgeting approach is a key aspect of how
the funds are allocated, with tenants and other customers consulted on where and
how the funds are spent. An annual report is provided to the relevant Area Committee
for each division, setting out projects delivered and tenant or other customer
consultation undertaken as part of these. Projects delivered to date through this
budget include:
▪ improvements to bin provision and storage 
▪ upgrades to communal drying areas 
▪ renewing fencing 
▪ improvements to parking provision 
▪ lock up investment 
25

Page 26

1.11. Within the Council’s budget for 2026/2027, a one-off investment of £0.500 million has
been allocated to the Estate Improvement Budget with the purpose of further
improving areas surrounding the Council’s housing estate, improving the environment
including drying areas and railings.  A variety of estate improvements projects will be
carried out across the 4 localities including lock up investment and demolition, drying
green upgrades, green spaces (that require old shrubs to be replaced, or area turfed)
and upgrades to open plan land. 
1.12. Tenant representatives across each division will be informed of the additional funding
available for this purpose and continue to be involved in agreeing the allocation of the
funds through a continued participatory budgeting approach, alongside a review of the
priority projects as set out within the future housing investment plan. 
1.13. Progress and outcomes relating to the Estate Improvement Budget is reported to the
relevant Area Committee on an annual basis, with summary updates also provided to
Housing and Technical Resources Committee as part of the Resource Plan, and the
Executive Committee as part of the Local Housing Strategy and Participatory
Budgeting updates.  Due to these additional funds being allocated to the Estate
Improvement Budget, a follow up report will be presented to this Committee in June
2026, confirming the detail of the additional projects and associated timescales for
completion 
1.14. Housing Services will commence a review of the housing investment plan considering
priority estate improvements alongside engagement with tenant representatives for
each of the four housing localities to advise of the additional funding and agree priority
areas for spend. 
1.15. Care Experienced Young People: Accommodation (£0.500m): Through investing
in accommodation units, this will support delivery of The Promise by enabling young
people to gain experience of living independently, with support, prior to moving to their
own home. Investment monies will provide additional local accommodation capacity
for care experienced young people through 5 modular accommodation units within the
curtilage of South Lanarkshire children’s houses. 
1.16. Visual Equipment for Schools (£2.1m): This will allow visual equipment to be
replaced and updated to ensure all of our schools across South Lanarkshire have the
modern equipment they need to deliver quality education to our young people. A
survey has recently completed to assess the estate and a planned programme of
purchase will take place imminently and be completed across the session 2026/2027. 
1.17. Additional Support Needs School Estate Improvements (£0.500m): Provision for
secondary aged young people within Sanderson High School and Rutherglen High
School will be improved, providing adaptations to ensure the needs of young people
are sufficiently met, including accommodating increased wheelchair use, and
requirements for feeding and personal care. The investment will enable works to be
completed at both sites and also facilitate adaptations to a current secondary SEBN
Base to support planned changes for learners. A survey has been undertaken on both
secondary ASN provisions with work due to begin prior to the summer. 
1.18. Country Parks (£7.3m): Investment of £7.3m in our two main country parks will
progress key elements of existing masterplans and significantly improve the visitor
experience across these much valued assets. Planned projects include the £1.2m
expansion of the playpark at Chatelherault, delivering new facilities that will cater to a
wider age range and increase visitor capacity.  
26

Page 27

1.19. At Calderglen, enhanced access infrastructure, upgraded active travel routes,
improved wayfinding, improved footpath infrastructure and new lighting at a total cost
of £5.6m will make the park more accessible, more secure, and easier to navigate.
These developments will support local tourism and ensure that the parks continue to
offer high quality, family friendly recreation. Strengthening the infrastructure within
country parks will also assist in attracting new business and events, protect natural
environments while encouraging sustainable access for future generations. 
1.20. A further £0.5m is identified to support the design development of these projects which
will take place during 2026/2027 with works programmed to commence from
2027/2028. 
1.21. Outdoor Investment (£4.000m): Investment of £4.0m will allow upgrades to outdoor
and recreational spaces to ensure that more people can enjoy accessible, high-quality
facilities within their own communities. Accelerated refurbishment of Multi Use Games
Areas (MUGAs), including those within school estates, will improve opportunities for
sport and play while reducing maintenance issues associated with ageing surfaces. It
is proposed to allocate £1.0m towards the upgrade of these facilities with the first of
these enhancements being undertaken at Hareleeshill Primary School, Lanark
Primary School, Robert Smillie Primary School and St Vincent’s Primary School. 
1.22. Our communities also have a number of other assets which would welcome 
investment such as former tennis courts, 5 aside pitches, features within parks as well
as general enhancements such as pathway improvements, new lighting, to make
recreational spaces safer and more inclusive, particularly for children, older adults,
and those with mobility challenges. An allocation of £2.0m is proposed for this activity
with initial projects identified as Bothwell Road Park Bandstand and Overtoun Park
Bandstand. 
1.23. The intention to bring unused or underutilised spaces back into community use has
the potential to revitalise neighbourhoods, unlock local volunteering and community
involvement. It is proposed that £1.0m is allocated to support community groups
upgrade outdoor spaces and pitches which will also unlock external funding
opportunities and support Community Asset Transfers potentially including community
projects at Eddlewood Park in Hamilton and Raploch in Larkhall. 
1.24. Local Action Fund (£1.000m): Building on last year’s investment in all wards, £0.050
million is available for each ward. Section 7 of this paper provides a proposed
approach to identifying where the Community Engagement Team provide Elected
Members with an analysis of the local views, together with other community feedback
received through stakeholder groups. Officers would be available to support elected
members in each ward on how they use this information. Members may agree their
own proposals, but if not then further engagement with Stakeholder Groups could be
carried out to provide a list of potential Local Action Fund projects. The planned
timeline for proposals is detailed in section 7.8. 
1.25. Culture Strategy (£0.800m): The one-off investment in a cultural strategy represents
a valuable opportunity to strengthen the cultural identity of South Lanarkshire’s towns
and communities. Delivered in partnership with South Lanarkshire Leisure and
Culture, this funding will support locally driven cultural activities, events and initiatives
that celebrate heritage, highlight creativity, and widen access to arts and culture. It will
also help develop a place-based approach that recognises the important role of
libraries, museums, and community organisations in shaping local identity and
participation. 
27

Page 28

1.26. Community Engagement Team (£0.100m): This investment will allow for an
additional community engagement officer, helping our communities, including
organisations looking to progress community asset transfers. 
28

Page 29

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Review of Petitions Process 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of the outcome following a review of the petitions process
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that, following a review of the petitions process, consideration be given to
whether the criteria for petitions be amended:- 
 to allow for the submission of petitions from businesses entered on the
Valuation Roll for the South Lanarkshire Council area
 to make it clearer that any petitions that relate to a current or recent
proposal that is subject to a specific Council consultation/engagement
exercise will be passed to the relevant Resource for consideration and
response
 to make it clear that the Head of Administration and Legal Services will
determine any matters of dispute in respect of the petitions process,
including as to whether a petition is valid
 to make it clear that, should a petitioner be dissatisfied with their petition
being determined as invalid, they have the option of asking that it be
considered under the Council’s formal complaints procedures 
(2) that, subject to the Committee’s decision, authority be delegated to the
Executive Director (Finance and Corporate Resources) to update the current
petitions procedures and associated guidance, to reflect the Committee’s
decision; and
(3) that the proposed promotion of the petitions process, as outlined at paragraph
7.1, be noted. 
3. Background
3.1. In June 2018, the Council approved the establishment of a Petitions Committee
following on from the recommendations of a cross-party Task and Finish Group which
had considered the following areas in detail:- 
 to what extent the establishment of a Petitions Committee would improve the
ability of local communities/residents to engage with the Council
 the development of a set of guidance and criteria for the public on how to submit
a petition and how the process of validating and considering a petition would work
in practice within the Council when a petition was submitted 
5
29

Page 30

 a Terms of Reference for the Petitions Committee
 the development of a communications plan via the Council’s website, local
newspapers or other digital mediums to raise public awareness of the
establishment of the Petitions Committee 
3.2. The Group had produced a “Guidance on Sending a Public Petition” document which
formed the basis of the criteria and approval process.  A copy of the approved
guidance is attached as Appendix 1 to the report. 
3.3. A link to the report can be accessed here. 
3.4. At its meeting on 10 December 2025, the Council agreed that a review be conducted
on the effectiveness of the petitions process, with a view to expanding democratic
engagement by considering factors such as the expansion of the criteria for petitions
to be considered by the Petitions Committee and a greater promotion of the petitions
system online and on social media.  A copy of the motion is attached as Appendix 2
to the report. 
4. Current Process
4.1. Since its establishment, the Petitions Committee has met 9 times.  There have been
24 petitions received to date, 9 of which were reported to the Committee.  15 petitions
were not taken forward to the Petitions Committee for various reasons, based on the
Council’s current criteria, with a breakdown provided as follows:- 
 2 related to an individual or personal issues (this concurs with the criteria applied
by a number of other local authorities, such as Edinburgh, Renfrewshire and
West Dunbartonshire)
 1 related to a committee decision taken during the preceding 6 months (this
concurs with the criteria applied by a number of other local authorities, such as
Edinburgh, North Lanarkshire, Renfrewshire)
 1 had used a platform that did not provide addresses and did not respond to
advice given on how to make a valid petition
 1 had not been progressed by the lead petitioner
 5 related to matters that were subject to a specific consultation/engagement
exercise which had not concluded
 1 related to a matter that was not competent from a financial perspective in terms
of capital investment
 1 related to a matter that was subject to ongoing discussions between the lead
petitioner and the Resource and had used a platform that did not provide
addresses.  Advice given to the lead petitioner in terms of what was required to
take the petition forward
 1 related to a matter that had not gone through the Council’s complaints process
(this concurs with the criteria applied by a number of other local authorities, such
as Aberdeenshire, Renfrewshire and West Dunbartonshire)
 1 related to a matter that had not gone through the Council’s complaints process,
was subject to ongoing consultation, as well as a committee decision taken during
the preceding 6 months
 1 related to a matter that was subject to an ongoing consultation and was outwith
the authority of the Council but was passed to SLLC officials 
5. Comparison with Other Scottish Local Authorities
5.1. Of the 32 Scottish local authorities, 25 have some form of petitions process.  Some
councils have a specific committee to deal with petitions, while others consider
petitions via their Risk and Audit Scrutiny Committee or via the appropriate committee,
depending on the subject matter. 
30

Page 31

5.2. In terms of some councils with a specific Petitions Committee, in the same period since
this Council established its petitions process, Midlothian Council’s has met 3 times,
East Lothian 7 times, Renfrewshire 15 times and Inverclyde 32 times. 
Clackmannanshire Council established a specific petitions committee in 2023 which
has met once since then. 
5.3. Some councils have 2 versions of the petitions form, one for individuals and one for
local businesses, voluntary organisations, social enterprise companies or Community
Planning partners.   
5.4. The minimum number of signatories for individual petitions varies across local
authorities, as shown in the table below, and, in general, this Council is towards the
lower end, given its size:- 
Council No of Signatories
Aberdeen City 100
Angus 50
Clackmannanshire 250
Falkirk 50
Fife 21
Glasgow City 25
Inverclyde 100 (50 if submitted by a community group)
Moray 50
Scottish Borders 10
Shetland Islands 20
South Lanarkshire 50 (although for small communities, the Chair of the
Petitions may lower the minimum number of
signatures needed)
Stirling 40
The City of Edinburgh 200 (50 if submitted by a community group)
The Highland 50
West Dunbartonshire 200 
5.5. For those authorities which accept petitions from businesses, the minimum number of
signatories varies, although those businesses must be entered in the Valuation Roll
for the Council area.  Aberdeen City Council, Inverclyde Council and The Highland
Council set it at 10, with Clackmannanshire Council, Glasgow City Council, Scottish
Borders Council and Stirling Council setting it as 5.  The City of Edinburgh Council
sets the level at 20.  This Council’s current procedures do not specifically permit or
prohibit such petitions.  As far as officers are aware, this has not prevented such
petitions coming forward, but the position could be clarified. 
5.6. The criteria used by local authorities in terms of issues that can/cannot be considered
is broadly similar.  Similar to this Council, Midlothian Council, Moray Council and North
Lanarkshire Council do not consider petitions that relate to a current or recent proposal
that is subject to a specific council consultation/engagement exercise.  In those
circumstances, the consultation process is the mechanism to allow all parties to
express their views. 
5.7. Save as commented on above, the Council’s current petitions processes are similar
to those adopted by those local authorities that have a formal petitions process.  
31

Page 32

6. Potential Changes to the Current Criteria
6.1. It is proposed that consideration be given to whether the petitions criteria be
amended:- 
 to allow for the submission of petitions from businesses entered on the Valuation
Roll for the South Lanarkshire Council area, with a minimum of 10 signatories, ie
10 businesses or organisations on the Valuation Roll
 to make it clearer that any petitions that relate to a current or recent proposal that
is subject to a specific Council consultation/engagement exercise will be passed
to the relevant Resource for consideration and response
 to make it clear that the Head of Administration and Legal Services will determine
any matters of dispute in respect of the petitions process, including as to whether
a petition is valid
 to make it clear that, should a petitioner be dissatisfied with their petition being
determined as invalid, they have the option of asking that this be considered
under the Council’s formal complaints procedures 
7. Promotion of Petitions Process – Online/Social Media
7.1. Work will be undertaken to raise public awareness of the petitions process through the
Council’s news website www.southlanarkshireview.scot and social media channels
such as Facebook and Bluesky.   
8. Employee Implications
8.1. Should there be an increase in the number of petitions received by the Council, there
might be a requirement to convene more meetings of the Petitions Committee. 
9. Financial Implications
9.1. None. 
10. Climate Change, Sustainability and Environmental Implications
10.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
11. Other Implications
11.1. There are no risk implications in terms of the information contained in this report. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
12.2. When reviewing the current process, comparison was made with other Scottish local
authorities. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
5 May 2026 
32

Page 33

Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council of 10 December 2025 and 27 June 2018 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Strachan, Head of Administration & Legal Services 
Ext:  4658 (Tel:  01698 454658)
E-mail: iain.strachan@southlanarkshire.gov.uk 
33

Page 34

34

Page 35

Appendix 1
South Lanarkshire Council
Guidance on Sending a Public Petition 
Our Values 
One of South Lanarkshire Council’s key values is that we are focused on people and 
their needs. People and communities are at the very heart of this vision, which is to 
improve the quality of life of everyone in South Lanarkshire. 
The Council aims to work with all sections of the community to ensure South 
Lanarkshire remains a great area for residents to live, and an attractive place for 
others to visit and in which to invest. 
1 Introduction
1.1 South Lanarkshire Council aims to provide you with good quality services which are easy to
access and meet your needs as a citizen of South Lanarkshire. 
1.2 The public petitions’ process plays a key part in these aims by encouraging you to
participate fully in the decision making process, either by yourself or as part of a group. 
1.3 If you would like to send the Council a petition, please read the following guidance and
instructions carefully before preparing and submitting a petition. 
2 Issues which we will consider
2.1 Your petition should refer to services provided by South Lanarkshire Council or issues that
affect your community that the Council is involved in.  You should clearly explain the purpose
of the petition and what result you expect to achieve. 
3 Issues we will not consider 
♦ If your petition is a comment or a complaint you should send it through the Council’s well
established complaints process.  The link to the comments and complaints form is
provided below:- 
https://www.southlanarkshire.gov.uk/info/200170/comments_complaints_and_consultations/
579/comments_compliments_and_complaints_procedure 
♦ Petitions that refer to any current court, legislative or regulatory proceedings, for example
planning or licensing applications 
♦ Petitions that are the same or very similar to petitions the Council has already
considered within the previous twelve months 
♦ Petitions submitted by Councillors 
♦ Petitions that relate to a current or recent proposal that is subject to a specific Council
consultation/engagement exercise 
♦ Petitions that relate to individual or personal issues 
4 Action you should take before you send us a petition
4.1 Before submitting a petition, you should have:- 
♦ raised the issue with the Council, in the first instance, ie as a comment/complaint/email
to the relevant Resource/Service 
♦ it is desirable that you have raised the issue with one of your local elected members or
the relevant Community Council  
4.2 Please ensure copies of your correspondence on the above are attached with your petition. 
5 Submitting a Petition
5.1 You can submit a petition by email, by post or by hand 
5.2 For all petitions submitted by email, post or by hand there are some basic requirements.
5
35

Page 36

5.3 The petition should be titled and include a statement of no more than 250 words which
covers the purpose of the petition and details the results you would expect to achieve by
presenting the petition to the Petitions Committee. 
5.4 Your Petition must have a minimum of 50 signatories who must live within the South 
Lanarkshire area or be directly affected by the issue that the petition is raising. 
(Note: Fewer signatories may be accepted at the discretion of the Petitions Committee 
Chair, where the issue concerns a small community which could not be reasonably be 
expected to raise 50 signatories). 
The petition must include the following:- 
♦ Your name or the name of the principal petitioner who must live within the South
Lanarkshire Council area; (we may check your eligibility). 
♦ You or the principal petitioner’s address to which all communications will be sent 
♦ The name, address and signature of any person(s) supporting the petition 
5.5 Names and addresses can be gathered both online and by paper.  If you are going to use
both a paper and online version, we ask that you remove any repeat names before
submitting it to the Council. 
5.6 For paper petitions, it would be helpful if your petition is typewritten or completed using a
black pen.  If you have any difficulty in filling in the form, please contact the Clerk to the
Committee for assistance. 
5.7 If your petition is endorsed by a Community Council, a Community Council Office Bearer
must countersign the petition at part two. Where relevant, you should also attach a copy of
the minutes of the Community Council meeting, when the support was approved. 
5.8 A form for petitions is included within these Guidance Notes.  You can also download the
form from the Council’s website at www.southlanarkshire.gov.uk  You can also request a
paper copy by contacting the:- 
Clerk to the Public Petitions Committee
South Lanarkshire Council
Council Offices
Almada Street
Hamilton
ML3 0AA 
6 Online Petitions
6.1 The Council has a dedicated webpage where you can set up your petition and people can
sign up to your petition. 
6.2 Online petitions can be hosted on the website, once approved, for one month.  During this
time, people wishing to support the petition can do this online by registering the following
details: 
♦ Name 
♦ Address 
♦ Email address 
6.3 Supporting signatories must live within the South Lanarkshire Council area or be directly 
affected by the issue that the petition is raising. 
6.4 You can also collect paper signatures alongside online signatures.  Only the principal
Petitioner can submit paper signatures to the Committee Clerk to update the number on the
website. 
36

Page 37

6.5 Online Petitions will display: 
♦ Title/subject of the Petition 
♦ Principal Petitioner’s name 
♦ Start and closing date 
6.6 The Clerk to the committee will notify the person who registered the petition (the principal
petitioner) once a petition has reached the required number of signatures. 
6.7 Once submitted, South Lanarkshire Council will endeavour to validate online petitions within
10 working days.  This time will be used to ensure that petitions are valid and meet the
eligibility criteria.  Principal Petitioners are advised to take this into account before
proceeding. 
6.8 Once the petition has been accepted, it will become a public document available to view on
the Council’s website. 
7 Privacy Policy and Content of Petitions
7.1 Information about any individual will not be used for any other purpose other than in relation
to the petition.  Our Privacy Statement sets out how we collect information and what we do
with it. 
7.2 For your part, you must make sure the information you send does not include: 
♦ false or insulting statements 
♦ information that is protected by an interdict or court order 
♦ information that is commercially sensitive, confidential or that may cause personal
distress or loss 
♦ the names of individual officers of public bodies 
♦ the names of other individuals or information whereby they may be easily identified 
♦ offensive language, for example swear words, insulting, sarcastic or provocative
language or other terms that could reasonably be considered as offensive by the reader 
♦ duplicate signatures 
8 Support and help with a petition
8.1 We will accept petitions in community languages and other formats.  We will also arrange for
interpretation and translation services, including British Sign Language if you need it.  We
will take account of your needs when making arrangements to hear petitions.  If you need
any support, you or your representative, should discuss these with the Clerk to the
Committee. 
9 How to send in your petition
9.1 If you complete your petition using our online petition system, we will confirm your petition is
submitted once you reach the required level of signatures or support. 
Email, post or hand-delivery 
9.2 When you are satisfied your petition meets the conditions outlined in this guidance, you
should submit the petition to:- 
Clerk to the Public Petitions Committee
South Lanarkshire Council
Council Offices
Almada Street
Hamilton
ML3 0AA 
9.3 You can also email your petition to a generic Petitions inbox which will be set up for this
purpose.  The Clerk will let you know your petition has been received. 
37

Page 38

10 What happens next
10.1 Once your petition has been checked (validated) that it meets the criteria set out at section 2
to 5 as being completed correctly, a committee date will be allocated.  This will depend both
on the workload of the Committee and also the time taken to complete the validation
process. 
10.2 The Chair of the Committee may invite petitioners to appear before the committee to speak
in support of their petition to help the committee reach a decision.  As a petitioner, you
should indicate on the form if you want to make a statement to the committee. 
10.3 Subject to the discretion of the Chair of the Committee, you as a petitioner can speak for up
to 10 minutes.  You may bring up to two supporters to the Committee who may speak on
your behalf. 
10.4 Councillors on the Committee may ask you questions relating to the issue or issues that
have been raised in the petition. 
10.5 If you as a petitioner need any help making a statement to the Committee – for example
translation and or interpretation – please contact the Clerk to the Committee in advance. 
10.6 Following the consideration of a petition, the Public Petitions Committee will take a decision
on action to be taken as follows:- 
(a) Agree the issue(s) raised deserves further action and agree to refer the petition to
another Council Committee, officer or other organisation 
(b) Agree the issue(s) raised does not merit further action; or 
(c) Refer, with recommendations, for further action 
10.7 You, as the petitioner, will be advised of the committee’s decision in writing within 10 working
days of the Petition Committee meeting. 
11 Further Information
11.1 All letters and enquiries should be sent to:- 
Clerk to the Public Petitions Committee
South Lanarkshire Council
Council Offices
Almada Street
Hamilton
ML3 0AA 
38

Page 39

Please refer to the Guidance on Submission of Public Petitions before filling in this form.  If
you need more information or advice, please contact the Clerk to the Committee at the
address provided in Paragraph 11 of the guidance or on 01698 455652 or email
carol.lyon@southlanarkshire.gov.uk 
Details of principal petitioner 
Please enter the name of person and organisation (if this applies) raising the petition.  Please
include a contact address where correspondence will be sent, a phone number and email address if
available
Name: 
Address: 
Phone No: 
Email: 
Petition Statement 
Title of Petition ……………………………………………………………………………………………......
Please write in no more than 250 words
♦ the purpose of your petition; and
♦ the result you are looking to achieve from your petition 
Action taken, if any, to resolve issues of concern before submitting the petition 
Please enter below details of any individuals or organisations approached.  You should attach
copies of correspondence, including any responses.  This information will be made available to the
Public Petitions Committee before it considers the petition. 
Appearance before Committee 
The Chair of the Public Petitions Committee may invite petitioners to appear before the committee
to speak in support of their petition 
Please indicate below whether you would like to make a brief statement to the committee when it is
considering your petition 
*I do wish the opportunity to make a statement to the committee 
**I do not wish to make a statement to the committee 
Please tick as appropriate 
39

Page 40

Signature of principal petitioner 
When you are satisfied the petition meets all the conditions outlined in the Guidance on Submission
of Petitions, you, as the principal petitioner, should sign and date the form in the box below. 
Signature…………………………………………………………….….  Date…………………………….. 
Name in block capitals……………………………………………………………………..……………… 
Form A 
Petition submitted by citizens 
A petition must be supported by 
♦ a minimum of 50 signatures from people living in the South Lanarkshire Council area
♦ or, if submitted by a community where it could not reasonably expected to raise 50 signatures,
this will be determined by the Chair 
If gathering signatures please complete this part of the form 
Name Address Signature
1.  
2.  
3.  
4.  
5.  
6.  
7.  
8.  
9.  
10.  
11.  
12.  
13.  
14.  
15.  
16.  
17.  
18.  
19.  
20.  
21  
22  
23  
24  
25     
40

Page 41

50   
41

Page 42

42

Page 43

Appendix 2 
Notice of Motion to Council on 10 December 2025 
“Council firmly believes in the principle of local residents having the ability to influence
decision making on matters which affect them and their communities. 
Council acknowledges the importance of having a formal petitions system to this principle
and the associated benefits to democratic engagement and public participation in local
governance. 
However, Council regrets that the Petitions Committee has only considered a very limited
number of petitions since its establishment. 
Further to this, Council recognises that improvements could be made to the existing
petitions process. 
Council therefore requests that officers conduct a review of the effectiveness of the
petitions process with a view to expanding democratic engagement. The review will
consider factors such as the expansion of the criteria for petitions to be considered by the
Petitions Committee and a greater promotion of the petitions system online and on social
media. 
Council subsequently requests that a report be brought to the Executive Committee
containing the outcomes of this review and recommendations for decision.” 
5
43

Page 44

44

Page 45

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Statutory Review of the Byelaws Prohibiting the
Consumption of Alcohol in Designated Public Places
1. Purpose of Report
1.1. The purpose of this report is to:- 
 advise Committee of the statutory requirement to review the South Lanarkshire
Council byelaws which prohibit the consumption of alcohol in designated public
places, and to seek authorisation for how the review will be undertaken
 seek authorisation for the continuation of the existing byelaws as presently
constituted until such time as the review is complete
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-  
(1) to note that a statutory review of the South Lanarkshire Council byelaws which
prohibit the consumption of alcohol in designated public places requires to be
undertaken;
(2) to agree that a statutory review be undertaken, as outlined in Section 4 of this
report;
(3) to note that, following the statutory review, a report will be presented to the
Committee on 16 September 2026 to approve the results of the review and
seek such further authority as necessary, and
(4) to agree that the present byelaws shall continue in effect as presently
constituted pending the completion of the review. 
3. Background
3.1. The current byelaws prohibiting the consumption of alcohol in designated public places
came into force in South Lanarkshire in March 2010 and were updated in April 2014.
The areas subject to the byelaws are described in the schedule to the 2010 byelaws
with reference to named areas and plans of the areas covered, with further information
being available on the Council’s website here: Byelaws and management rules - South
Lanarkshire Council.  The named areas are also included in the Appendix to this
report. 
3.2. The byelaws were introduced to reduce the nuisance and disorder that can be
associated with public drinking. The South Lanarkshire byelaws prohibit the
consumption of alcohol in certain designated public places with reference to specified
areas and plans. The byelaws also make it an offence for a person to have in their
possession an open container of alcohol in certain designated public places. Further
guidance on such byelaws is also available from the Scottish Government. According
to the Scottish Government, more than 480 towns and villages across Scotland,
including Glasgow and Edinburgh, have such byelaws. 
6
45

Page 46

3.3. The Local Government (Scotland) Act 1973 (the 1973 Act) Section 202A requires local
authorities to review byelaws within 10 years of the date they came into force. As the
byelaws were last reviewed by the Council and confirmed by the Scottish Government
in 2014, they require to be reviewed. The byelaws are still in force without the review
having been conducted, but the Council should now carry that out, to verify the ongoing
need for the byelaws. For completeness, Committee’s approval is sought to confirm
the continuation of the existing byelaws as presently constituted until such time as the
review is complete. 
3.4. There is no prescribed procedure for reviewing byelaws. It is, therefore, proposed that
a consultation is undertaken with the public and relevant stakeholders. If the review
results in a recommendation to the Council to amend or revoke the byelaws, further
statutory procedure requires to be followed. 
4. Proposals
4.1. It is recommended that the consultation process, led by the Council’s Legal Services
team with input from the Community Engagement Team, involves consultation with
the following groups in addition to the general public: 
 Elected Members
 South Lanarkshire MPs and MSPs
 Police Scotland
 The Procurator Fiscal
 NHS Lanarkshire
 South Lanarkshire Community Councils
 South Lanarkshire Council’s Planning Service
 South Lanarkshire Council’s Anti-Social Behaviour Team
 South Lanarkshire Community Safety and Planning Partnerships 
4.2. Consultees will be asked:- 
 whether they consider the byelaws are still necessary and appropriate to prevent
the problems that can be experienced with nuisance, disorder and antisocial
behaviour which can be related to drinking in public places
 if they consider any amendment is required to the byelaws or the areas covered.
Given the passage of time, there may be new housing developments or other
considerations which consultees believe require to be taken into account and
reflected in the byelaws, should they be retained 
4.3. It is proposed that the results of the Council consultation will then be reported to the
Executive Committee in September to determine whether the byelaws should
continue in their current form, be amended or be revoked. 
4.4. If amendment of the byelaws is required, then the following steps will be taken: 
(1) The Committee will be asked to approve the new draft byelaws and approve
that confirmation of the new draft byelaws be sought from the Scottish
Government, once the process below has been undertaken.
(2) Should the Committee approve the new draft byelaws, they will not come into
effect until they are confirmed by the Scottish Government. The existing
byelaws will continue in force until such times as the new draft byelaws are
confirmed by the Scottish Government.  
46

Page 47

(3) At least one month before an application for confirmation of the byelaws to the
Scottish Government is made, a notice must be placed in local newspapers
informing the public of the Council’s intention to apply to the Scottish
Government for confirmation of the byelaws. The notice will specify where a
copy of the byelaws can be inspected and how any objections to the
confirmation can be made.
(4) Objections to the confirmation of the byelaws can be made to the Scottish
Government within one month of the public notice being published. Before
confirming the byelaws, the Scottish Government are obliged to take into
consideration any objections received and may, if they consider it necessary or
desirable, require a local inquiry to be held.
(5) The Scottish Government may confirm, with or without modification, or refuse to
confirm, any byelaws submitted for confirmation. If the byelaws are confirmed,
the Scottish Government will fix the date on which the byelaws are to come into
operation.
(6) As soon as practicable after receiving the confirmation of the byelaws from the
Scottish Government, the Council requires to give notice in local newspapers
informing the public of the date on which the byelaws will come into operation
and where a copy of the confirmed byelaws can be inspected. Notice of the
revocation of the existing byelaws will also be made at that time, with the
revocation coming into effect at 11.59 pm on the day prior to the new byelaws
coming into effect. 
5. Next Steps
5.1. If the recommendations above are approved by the Committee, the Head of
Administration and Legal Services will progress with the review as proposed. 
6. Employee Implications
6.1. There are no employee implications arising from the proposals within this report. 
7. Financial Implications
7.1. Any costs associated with consultation and promoting the new byelaws will be met
from existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability or environmental implications arising
from this report. 
9. Other Implications
9.1. There are no risk or other implications associated with the content of this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. However, an integrated impact assessment will be
conducted as part of the review. 
10.2. Information on the consultation proposals is provided at paragraph 4 of this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 March 2026  
47

Page 48

Link(s) to Council Values/Priorities/Outcomes
 We will work to put people first and reduce inequality
 Caring, connected, sustainable communities 
Previous References
 Corporate Resources Committee Report, 1 October 2008 
 Corporate Resources Committee Report, 4 March 2009
 Corporate Resources Committee Report, 28 October 2009
 Corporate Resources Committee Report, 2 June 2010
 Executive Committee Report, 10 March 2010
 Executive Committee Report, 26 March 2014
 Executive Committee Report, 11 February 2015 
List of Background Papers
 The South Lanarkshire Council Prohibition of Consumption of Alcohol in Designated
Public Places Byelaws 2010
 The South Lanarkshire Council Prohibition of Consumption of Alcohol in Designated
Public Places (Amendment) Byelaws 2014 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Strachan, Head of Administration and Legal Services
Tel: 01698 454658
E-mail : Iain.Strachan@southlanarkshire.gov.uk  
48

Page 49

Appendix 
Map No Location
1 Abington
2 Ashgill & Shawsburn
3 Biggar
4 Blackwood & Kirkmuirhill
5 Carluke & Braidwood
6 Carnwath
7 Carstairs, Carstairs Junction & Westend
8 Chapelton
9 Coalburn
10 Crawford
11 Crossford
12 Douglas
13 East Kilbride
14 Ferniegair
15 Forth
16 Glassford
17 Hamilton
18 Hazelbank
19 Kirkfieldbank
20 Lanark
21 Larkhall
22 Law
23 Leadhills
24 Lesmahagow
25 Netherburn
26 Rigside
27 Rosebank
28 Rutherglen & Cambuslang
29 Sandford
30 Stonehouse
31 Strathaven
32 Symington
33 Thankerton 
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Representation on International Children’s Games 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek the Committee’s approval to make a nomination for representation on the
General Assembly and related committees of the International Children’s Games 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Mr Hugh Waters be nominated by the Council as its representative on the
International Children’s Games’ General Assembly, and as Executive
Committee Secretary General, but also for the Committee should he not be
appointed to the Executive Committee.
[1r
3. Background
3.1. The International Children’s Games (ICG) is an event recognised by the International
Olympic Committee, which first took place in Slovenia in 1968, for children aged 12 to
15 years. According to the ICG website, there have been over 55 International
Children’s Summer Games and 8 International Children’s Winter Games, across over
300 events spanning over 40 sports, with delegations from more than 600 cities
representing over 100 countries. 
3.2. A delegation from South Lanarkshire has previously taken part in the games, but not
since 2022, when it was held in the UK. That was reported to the Executive Committee
on 1 December 2021. With this previous involvement, Lanarkshire is listed as a
member city of the ICG. The next games are taking place in August this year, in
Taiwan. 
3.3. More information can be found on the ICG website. History – International Children's
Games 
3.4. As a member city, the ICG has written to the Chief Executive seeking confirmation if
Lanarkshire wishes to be represented on the ICG’s General Assembly. As a member
city, Lanarkshire is entitled to one representative on the General Assembly, but can
nominate up to two for positions on its Executive Committee and/or its Committee. The
closing date for nominations is 17 June 2026. The ICG Committee consists of the 6
Executive Committee positions and 12 other members.  
7
51

Page 52

4. Representation on International Children’s Games General Assembly
4.1. Lanarkshire is already represented on the General Assembly by Mr Hugh Waters, who
holds the position of Secretary General of its Executive Committee. Mr Waters wishes
to continue his involvement on both the General Assembly, and as Secretary General. 
4.2. Given the Council’s historic support for the ICG, and Mr Waters’ knowledge of
Lanarkshire, it is proposed that the Council nominate Mr Waters as its representative
on the ICG’s General Assembly, and as Secretary General, but also for the Committee
should he not be appointed to the above. Mr Waters has advised that he has already
secured North Lanarkshire Council’s agreement to his nomination. 
4.3. Subject to the Committee’s decision, a letter will be issued to the ICG confirming the
Council’s decision. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. There are no costs for the Council associated with this, and Mr Waters has confirmed
that he will meet any costs himself. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications as a result
of this report. 
8. Other Implications
8.1. There are no issues in terms of risk arising from this report. 
9. Integrated Impact Arrangements and Consultation Requirements
9.1. This report does not introduce a new policy function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.  Mr Waters has been consulted on the contents of this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
22 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee, 1 December 2021 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel: 07385 370089
E-mail: tracy.slater@southlanarkshire.gov.uk
52

Page 53

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Chief Executive  
Subject: Recommendation Referred by Finance and Corporate
Resources Committee 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 request approval of the undernoted recommendation referred to this Committee
by the Finance and Corporate Resources Committee at its meeting on 6 May
2026 in relation to the introduction of a Disability Policy
1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the proposed Disability Policy be approved. 
3. Background
3.1. Recommendations Referred by Finance and Corporate Resources Committee
of 6 May 2026 – Disability Policy – Extract of Minute 
A report dated 24 March 2026 by the Executive Director (Finance and Corporate
Resources) was submitted proposing the introduction of a Disability Policy to
enhance and support the Council’s duties under the Equality Act 2010. 
The Council is a Disability Confident Scheme member, which was awarded by the
Department for Work and Pensions in recognition of the Council’s commitment to
successfully retaining and employing disabled people and those with health
conditions. 
Information was provided on:- 
 the Council’s current polices that addressed improving inclusion
 the improvements that would be introduced through the implementation of the
Disability Policy 
The Head of Personnel Services advised that, in response to feedback received,
Step 9 of Sections 1 and 2 in Appendix C of the Policy would be amended as
follows:- 
“If an employee leaves the Council, the manager must ensure that all Council-owned
equipment is returned to the Council.  All specialist equipment funded through
Access to Work, remains the property of the individual employee.”
8
53

Page 54

Following consideration by this Committee, the draft Disability Policy, attached as
Appendix 1 to the report, would be submitted to the Executive Committee for
approval. 
The Committee decided: 
(1) that the proposed Disability Policy be endorsed and referred to the Executive
Committee for approval, subject to the amendment, as detailed. 
[Reference: Minutes of the Employee, Equalities, Diversity and Inclusion Forum of 4
March 2026 (Paragraph 7)] 
3.2. A link to the report submitted to the Finance and Corporate Resources Committee of
6 May 2026 is provided for information.  Disability Policy 
4. Employee Implications
4.1. The Disability Policy provides clear guidance to employees and managers on how
they will be supported should they declare that they have a disability or a health
condition which needs reasonable adjustments, installing confidence not only in
employees but also applicants in terms of the Policy underlining the Council’s
inclusive recruitment practices. 
4.2. Having this Policy will enable employees to be more open when they need support
and reasonable adjustments and, in turn, this may also reduce or remove some
workplace stress and potentially absences and increase support around return to
work. 
4.3. The Policy provides employees with greater reassurance that disclosures relating to
disability or health conditions will be managed sensitively and confidentially - and
importantly without risk of stigma, discrimination or disadvantage. 
4.4. With this new Policy, employees may feel more valued and included, which can lead
to improved morale and job satisfaction. 
5. Financial Implications
5.1. There are no financial implications, as at present, where reasonable adjustments do
incur a cost for the service, this is normally met via the Access to Work grants
process. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment. 
7. Other Implications
7.1. There are no risk or other implications linked to the content of this report. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. An integrated impact assessment Plans and policies - South Lanarkshire Council
has been carried out in relation to this Policy, which will enhance existing
arrangements and provide clear guidance and support to employees and managers
on the Council’s approach to disability. 
8.2. The development of the Disability Policy has been encouraged and fully supported
by the trade unions.  Feedback from trade unions and colleagues within equalities
and diversity, have contributed to the creation of this Policy. 
54

Page 55

Paul Manning
Chief Executive 
6 May 2026 
Link(s) to Council Values/Priorities /Outcomes
 Focussed on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Excellent employer
 Ambitious, self-aware and improving
 We will work with people first and reduce inequality
 People live the healthiest lives possible 
Previous References
 Employee, Equalities, Diversity and Inclusion Forum of 4 March 2026 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel:  07385 370089
E-mail:  tracy.slater@southlanarkshire.gov.uk 
55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Representation on Outside Bodies – Business Loans
Scotland 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on member representation on Business Loans Scotland
(formerly the West of Scotland Loan Fund Limited) 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Councillor Devlin replace Councillor Fagan as the Council’s
representative on Business Loans Scotland.
[1r
3. Background
3.1. The Council, at its meeting on 18 May 2022, approved its representation on certain
statutory joint boards and outside bodies.  A report, which provided an update on
arrangements which were delegated to the Chief Executive to finalise, was submitted
to the Council on 15 June 2022.  A further report to consider representation on a
number of other bodies was submitted to the Executive Committee on 29 June 2022
at which time, in respect of the remaining vacancies, delegated authority was given to
the Chief Executive, in consultation with the Leaders of the relevant Groups, to confirm
nominations. 
4. Representation on Business Loans Scotland
4.1. At the meeting of the Executive Committee held on 29 June 2022, Councillor Fagan
was appointed as the Council’s representative on Business Loans Scotland. 
4.2. Following notification of the intention of Councillor Fagan to step down from this
position, a request was received that Councillor Devlin replace Councillor Fagan as
the Council’s representative on Business Loans Scotland. 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. None. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications as a result
of this report.  
9
57

Page 58

8. Other Implications
8.1. In taking on such a role with an external organisation, an elected member will be
accepting additional duties and responsibilities, and they should ensure they are
familiar with those and able to fulfil them. Further information can be found in this
Standards Commission Advice Note for Councillors on ALEOs. 
9. Integrated Impact Arrangements and Consultation Requirements
9.1. This report does not introduce a new policy function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective and efficient 
Previous References
 South Lanarkshire Council 18 May and 15 June 2022 
 Executive Committee, 29 June 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Tracy Slater, Administration Adviser
Tel: 07385 370089
E-mail: tracy.slater@southlanarkshire.gov.uk 
58

Page 59

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire’s State of the Environment Report
2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Committee of the completion of the South Lanarkshire State of the
Environment Report 2025
 highlight the key findings from the Report
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the State of the Environment Report 2025 be approved and disseminated
across the Council and to relevant Council partners and external agencies for
use in the preparation of plans, policies, programmes and strategies and their
Strategic Environmental Assessment and as an information resource.
[1recs]
3. Background
3.1. The Environmental Assessment (Scotland) Act, 2005 requires all public bodies,
including the Council, to undertake Strategic Environmental Assessments (SEAs) of
all plans, policies, programmes and strategies (plans). A wide range of Council led
plans have, or are undergoing, SEA including the Community Plan, Council Plan,
Local Development Plan and the Sustainable Development and Climate Change
Strategy. 
3.2. An integral part of the SEA process is the identification and monitoring of a wide range
of environmental issues. The South Lanarkshire State of the Environment Report is
the body of data used to monitor and report Council activity against key environmental
indicators. It is the recognised source for the core data which allows SEAs on our plans
to be undertaken. 
3.3. With the declarations of ecological and climate emergencies, the State of the
Environment Report is a vital resource in outlining South Lanarkshire’s progress in
reducing its contribution to global warming and associated impacts from climate
change on communities, the natural environment and inclusive growth and for
protecting and enhancing the area’s biodiversity assets. 
3.4. Alongside these crises, the cost-of-living crisis, the housing emergency, and recovery
from the global Covid-19 pandemic have had significant impacts on people and
communities in South Lanarkshire, as elsewhere. The State of the Environment Report
provides an invaluable insight to these environmental impacts. 
10
59

Page 60

3.5. The first comprehensive State of the Environment Report was prepared in 2009 and
has been reviewed biennially to support SEAs and to fulfil the Council’s monitoring
obligations. The Report provides an effective means of tracking changes in the local
environment. This ensures that the Council not only has a clear understanding of the
current condition of the local environment but also has the accurate environmental
baseline data needed to allow its statutory SEA and monitoring work to be undertaken.
The Report also helps to promote awareness of local environmental issues and
priorities. 
3.6. The Report itself provides and analyses data across a suite of SEA environmental
issues and reports the findings in ten chapters. These chapters are: 
• Population and human health • Biodiversity, fauna and flora
• Historic and cultural heritage • Material assets and landscape
• Waste • Soil
• Air, noise and light • Water
• Climate change • Transport 
The trends identified across these issues allow the Council to assess the overall
condition of South Lanarkshire’s environment. The Report captures these as key
indicators to consistently identify where there is an opportunity to improve
environmental issues and the progress being made towards a sustainable South
Lanarkshire. 
3.7. Officers from Community and Enterprise and Education Resources have ‘converted’
the State of the Environment Report to Glow, the digital platform used by all South
Lanarkshire Council’s schools to be used as a teaching resource. The State of the
Environment Glow site was launched in May 2019 and will be further updated following
approval of this report.   
4. Development of the Report
4.1. The 2025 edition of the State of the Environment Report has been prepared by the
Council’s Planning Officer (SEA) within Community and Enterprise Resources with
data and other contributions sourced from across the Council, partners, government
bodies and external agencies. Development of the Report has been overseen by the
Corporate SEA Working Group.   
4.2. A healthy environment provides us with natural resources like clean air, clean water,
fertile soils, food, energy, medicine and building materials. Our long term economic
and social wellbeing ultimately depends on the environment and our natural resources.
Sustainable development is about achieving economic and social development in a
way that also enables us to protect and enhance our environment both now and for
the future. 
4.3. Sustainable development is a set of fundamental values by which we make decisions
and how we chose to live. These values are outlined in the 17 Global Sustainable
Development Goals of the United Nations 2030 Agenda for Sustainable Development.
The relevant Sustainable Development Goal(s) are assigned to each chapter of the
2025 edition of the State of the Environment Report to support understanding of how
South Lanarkshire can contribute to achieving the goals at both a national and global
level.  
60

Page 61

4.4. The Report requires to be formally approved by the Executive Committee as its
approval has not been delegated to officers. The Report and its findings will be
promoted to a wide range of stakeholders including the Community Planning
Partnership Board in June 2026 and presented to other groups and forums upon
request.   
5. Key Findings
5.1. The 47 indicators in the 2025 Report have each been assigned a status of ‘good’, ‘fair’
or ‘poor’, and traffic lighted as green, amber and red, respectively. Each of these
indicators also has a directional trend of either ‘improving’, ‘no change’ or
‘deteriorating’. The basis for the status identified within the tables, and accorded to
each indicator along with its trend, is demonstrated by the information contained within
the explanation column included as part of Appendix 1. The status of each indicator is
based on an opinion agreed by the Corporate SEA Working Group. 
5.2. The findings from the Report are illustrated in the following table and summarised in
Appendix 1. 
Status/Trend Improving Unchanged Deteriorating Total
Good 11 7 0 18 38.3%
Fair 7 15 0 22 46.8%
Poor 4 3 0 7 14.9%
Total 22 25 0 47 100% 
5.3. The Report highlighted that 18 (38.3%) of the 47 key indicators had ‘good’ status and
that 11 of these have a trend that is improving. There has been a significant
improvement in local air quality, with no areas currently in excess of national limits set
to protect human health and all Air Quality Management Areas have now been
revoked. There has been a continuous reduction in our greenhouse gas emissions
and an increase in our renewable energy capacity. Household waste generated and
collected is the lowest per household in two decades and the number of complaints
received about airborne nuisance have also significantly fallen. In terms of road safety,
the Council continues to make a positive contribution towards national casualty
targets. The number of child fatalities due to road traffic collisions has remained at
zero for the past six years. 
5.4. Seven of the indicators with a ‘good status’ had an ‘unchanged’ trend from the previous
edition. These include the number of various historic and cultural assets in South
Lanarkshire and the number of people who have not experienced traffic congestion
has remained constant over recent years. Similar to the 2023 Report, none of the
indicators with a ‘good’ status show a deteriorating trend. 
5.5. There are 22 (46.8%) indicators with a ‘fair’ status, seven of which have an improving
trend. These cover a wide range of environmental issues and indicators, including
improvements to our woodlands, greenspace and recreational land. Despite the
housing emergency, we continue to deliver new homes across all tenures. The number
of people using public transport has increased since the last Report, supported by
improved park and ride facilities and concessionary bus passes. However, patronage
has yet to return to pre-pandemic levels. 
5.6. The Report identifies 15 indicators with a ‘fair’ status which have an ‘unchanged’ trend.
This is because some environmental issues have stabilised or where there are
limitations on available data. None of the indicators with a ‘fair’ status have a
‘deteriorating’ trend.  
61

Page 62

5.7. Seven (14.9%) of the indicators, based on an assessment of the information contained
in the State of the Environment Report, are judged to be of ‘poor’ status. Of these, four
are ‘improving’. These include an increase in fuel consumption and kilometres
travelled for both personal and freight vehicles, although personal vehicles have yet
to reach pre-pandemic levels. Active travel uptake remains low but higher than pre-
pandemic levels. Active travel amongst school pupils remains constant and the uptake
of cycling continues to improve due to initiatives in schools such as Bikeability.
Premature deaths in South Lanarkshire remain significant across a range of
parameters, particularly cancer and coronary heart disease. There has been a
reduction in the number of deaths from alcohol, drugs and suicide in recent years.
Severe weather events continue to impact and have resulted in flood incidents across
the area. The Council’s approach to flood management continues to develop and
improve. 
5.8. Three indicators with a poor status have a trend which is ‘unchanged’. These include
tree canopy cover and peatland which remain poor. Work to improve these indicators
is ongoing but progress is not likely to be evident in the short to medium term. The
level of deprivation in South Lanarkshire remains high, although available data
suggests that these levels have remained broadly stable over time. 
5.9. There are no indicators with a ‘poor’ status and a ‘deteriorating’ trend. 
5.10. Ten indicators have seen a change in either status or trend since the 2023 edition of
the State of the Environment Report. These are set out in Appendix 2. There is an
improving trend in five of these indicators, particularly for local air quality which also
saw a change in status from fair to good. Five of the indicators have shown a
stabilisation since the 2023 Report. 
5.11. Following Committee approval, the State of the Environment Report will be uploaded
to the Council’s website. It is the intention to develop infographics to relay the key
messages from the Report to the general public. 
6. Employee Implications
6.1. None. 
7. Financial Implications
7.1. None. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The State of the Environment Report is a valuable resource for the Council and
partners in strategic planning. It provides the environmental baseline used in the
Strategic Environmental Assessment of all Council led plans, policies, programmes
and strategies. Strategic Environmental Assessment helps to safeguard South
Lanarkshire’s natural and built environment and raises awareness of climate change
impacts and directs climate action. 
9. Other Implications
9.1. There are no significant risks associated with the recommendations contained in this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
significant change to an existing policy, function or strategy, and therefore, no impact
assessment is required.  
62

Page 63

10.2. The draft State of the Environment Report has been subject to internal consultation,
facilitated through the Corporate SEA Working Group. Comments received have been
reviewed, and where appropriate, the Report has been amended. Following approval
by the Executive Committee it is intended to further disseminate the Report to relevant
partners and stakeholders and to make it available to the general public through the
corporate website. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
28 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Thriving business, fair jobs and vibrant town centres 
Previous References
 None 
List of Background Papers
 South Lanarkshire State of the Environment Report 2025
 South Lanarkshire Council Sustainable Development and Climate Change Strategy
2022 - 2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Jennifer Murphy, Advanced Planning Officer (SEA)
E-mail: jennifer.murphy@southlanarkshire.gov.uk
63

Page 64

Appendix 1 
Key findings from State of the Environment Report 2025 
Current status: Good
Environmental
Issue Indicator
Status
and
Trend 
Explanation
Biodiversity,
fauna and
flora
Local Nature
Reserves 
The council continues to monitor and improve the LNRs
within South Lanarkshire for people and nature. This has
been supported by accessing national funding.
Material
assets and
landscape
Vacant and
derelict land 
The remediation and redevelopment of vacant and derelict
land continues to be a priority for the council. The number
and area of vacant and derelict land sites continue to
decrease through re-development and greening,
Waste
Household
waste
management 
Despite a steady increase in the number of households,
the amount of household waste generated and collected
by the council is the lowest per household in two decades.
Household recycling and composting rates continue to
improve but have yet to return to pre-pandemic levels.
The tonnage of waste sent to landfill has significantly
decreased compared to the baseline figures.
Waste Environmental
waste 
Street cleanliness in the area continues to improve and
satisfaction levels remain above the Scottish average. The
occurrences of flytipping and the number of reported
abandoned cars have increased in recent years.
Air, noise and
light Local air quality 
Air quality across South Lanarkshire is generally good and
improving with no areas in excess of national limits set to
protect human health. As of November 2025, all three Air
Quality Management Areas in South Lanarkshire have
been revoked.
Air, noise and
light
Airborne
nuisance 
The number of airborne nuisance complaints received has
decreased significantly over recent years and is now at
the lowest level since this data was collected. Odour and
garden bonfires are the main nuisances reported to the
council.
Water Water pollution 
There has been continuous improvement in the treatment
of sewage and effluent discharges, however, point source
pollution remains a threat to the quality of the water
environment. This is closely monitored by SEPA.
Climate
change
Greenhouse
gas emissions 
Carbon emissions continue to decrease in South
Lanarkshire across all sectors year on year. Emissions
per capita remain below the Scottish average.
Climate
change
Renewable
capacity 
South Lanarkshire’s renewable energy capacity continues
to increase year on year mainly due to wind energy
developments. There has been a twelvefold increase
since 2011. There is growing interest in other renewable
technologies within the area. South Lanarkshire is an
energy exporter.
Climate
change
Environmental
awareness 
The council is implementing its Sustainable Development
and Climate Change Strategy. Initiatives such as the
Youth Forum, Beat the Street and Eco-schools continue to
help raise environmental awareness in schools.
Transport Road safety 
The council is making a positive contribution towards the
Scottish Government’s 2030 casualty reduction targets.
The number of child fatalities as a result of road traffic
collisions has remained at zero for the past six years.  
Historic and
cultural
heritage
Gardens and
Designed
Landscapes 
The number of Gardens and Designed Landscapes areas
in South Lanarkshire remains unchanged since 2016.
64

Page 65

Environmental
Issue Indicator
Status
and
Trend 
Explanation
Historic and
cultural
heritage
Historical
heritage 
The area has a wealth of historic and tourist attractions,
including the New Lanark World Heritage Site. These
continue to attract large numbers of visitors to South
Lanarkshire.
Material
assets and
landscape
Built facilities 
There are a wide range of education, academia, sport,
leisure and cultural facilities in South Lanarkshire. A
number of halls and community centres across the area
have been subject to Community Asset Transfer.
Material
assets and
landscape
Landscape 
The importance of quality landscapes in the area
continues to be recognised and protected through the
local planning process.
Soils Soil quality and
capacity 
Current data indicates good soil quality in a Scottish or
regional context. At present there is limited data on soil
quality specifically within South Lanarkshire. 
Transport Traffic growth  Road traffic growth is increasing since the last Report but
has yet to return to pre-pandemic levels.
Transport Congestion 
The number of residents who did not experience
congestion in the area has remained consistent over
recent years 
Improving  No change  Deteriorating 
65

Page 66

Current status: Fair
Environmental
issue Indicator
Status
and
trend 
Explanation
Biodiversity,
fauna and
flora
Native
woodland 
Although total native woodland cover is increasing,
further work is required to improve connectivity of
habitats, expanding native broadleaf woodland cover.
Historic and
cultural
heritage
Archaeological
sites 
The number of archaeological sites recorded across the
area continues to increase year on year, as does the
number of applications approved with archaeological
conditions.
Material
assets and
landscape
Recreational
land 
Investment in greenspace will be informed by the Open
Space Strategy that is under preparation. The number
of community allotments and plot holders has increased
considerably from previous years.
Material
assets and
landscape
Housing 
Good progress is being made in delivering the Local
Housing Strategy with 77% of indicators on track or
fully delivered by December 2025. The housing stock
across tenures has increased to 159,645 homes since
the last Report.
Air, noise and
light Noise 
The number of noise complaints, particularly residential
noise complaints, received by the council has
decreased since the last report. However, noise
complaints about commercial premises have increased.
Climate
change
Energy
consumption 
Gas and electricity consumption has significantly
decreased compared to the baseline. This is notable for
both South Lanarkshire and Scotland overall from 2021
related to the cost-of-living crisis and the elevated retail
gas and electricity prices.
Transport Public transport 
The number of park and ride facilities increased to help
facilitate an uptake in public transport. Although the
numbers of train and bus passengers have increased
since the last report, these have not yet fully recovered
from the impacts of Covid19. A large number of
residents are using concessionary bus passes,
particularly secondary school pupils.
Population
and human
health
Demographic 
The area’s population is growing at a slower rate than
the Scottish average, with a proportionally higher
growth rate of people aged over 65 years. The
population of people aged less than 16 years is
declining.
Population
and human
health
Morbidity 
The morbidity status and trend remain unchanged,
reflecting stable levels of long-term conditions and
multimorbidity across recent years.
Population
and human
health
Economy 
While the Scottish and UK economies continue to
experience a period of uncertainty and fragile
confidence, driven by rising costs and recent
government policy changes, the South Lanarkshire
economy is demonstrating notable resilience. Demand
for industrial property currently exceeds available
supply, and there is growing demand for support from
prospective and current entrepreneurs seeking to start
or grow their businesses.
Biodiversity,
fauna and
flora
Designated
areas 
More sites have been surveyed since the previous
report as part of NatureScot’s drive to improve nature
networks and meet biodiversity commitments for 2030.
Although there has been some isolated improvement,
in general the condition of the designated features
remains similar to previous reports.   
Biodiversity,
fauna and
flora
Ancient
woodland 
There is no change in the area of ancient semi-natural
woodland cover. There is limited data on the overall
condition of this habitat. 
66

Page 67

Environmental
issue Indicator
Status
and
trend 
Explanation
Historic and
cultural
heritage
Built heritage 
There has been minimal change in the number of
designated built heritage features in South Lanarkshire.
The number of Conservation Areas remain constant.
Material
assets and
landscape
Countryside
and outdoor
access 
There is an extensive path network across South
Lanarkshire. Investment to maintain and improve the
condition and standards of paths and other access
infrastructure is kept under review. 
Material
assets and
landscape
Minerals 
Minerals remain an economically important resource
across South Lanarkshire. Mineral recycling is being
further developed.
Soils Contaminated
land 
Approximately 82% of contaminated land sites have
been investigated and remediated since 2000 under the
Environmental Protection Act 1990.  
Air, noise and
light
Point source
emissions 
The number of permits issued for industrial activities in
South Lanarkshire has remained relatively consistent
over recent years.
Air, noise and
light Light 
Complaints about artificial light pollution have remained
relatively consistent over recent years. 
Water Water quality 
The overall status of rivers under the Water Framework
Directive (WFD) has remained consistent over recent
years.  
Water River flow 
The annual water flow rates in the rivers across the
region have remained similar to previous years with the
exception of 2020. The high level is closely linked to the
increase in annual precipitation rates, associated with
severe weather events.
Water Groundwater
and wetlands 
The number of groundwater bodies with a good status
in South Lanarkshire has remained the same since the
previous Report. The data available on ponds and
wetlands remains limited.  
Transport Road network
condition 
The condition of the road network has slightly
regressed in recent years although it remains better
than the Scottish average. Further deterioration in the
road network is expected in the short term. However, it
is anticipated that this will stabilise in the coming years
due to a modest increase in capital funding.
Population
and human
health
Economy 
South Lanarkshire’s economy is experiencing
uncertainty, with fragile confidence and weakening
growth driven by rising costs, subdued local demand,
and wider structural pressures. Additional strain from
recent policy changes, such as higher labour costs,
increased taxes, and more complex employment
regulations, is further intensifying financial and planning
uncertainty for businesses. 
Improving  No change  Deteriorating 
67

Page 68

Current status: Poor
Environmental
issue Indicator Status
and trend  Explanation
Population
and human
health 
Mortality 
Premature deaths in South Lanarkshire remain significant
across a range of parameters, particularly cancer and
coronary heart disease. There has been a reduction in the
number of alcohol specific deaths, drugs related deaths
and deaths related to probable suicide over recent years.
Water Flooding 
Severe weather events continue to impact and have
resulted in flood incidents across the council area. The
council’s approach to flood management continues to
develop and improve as available resources permit. 
Climate
change
Transport
emissions 
Fuel consumption and kilometres travelled for both
personal and freight vehicles have increased since the
pandemic, but personal vehicles have yet to reach pre-
pandemic levels. This may be linked to the numbers of
people who continue to work from home. Work continues
to promote the use of electric vehicles and other
sustainable transport modes.  
Transport Active travel 
Although the number of people walking and cycling
remains low these remain higher than pre-pandemic levels.
Active travel amongst school pupils remains constant and
the uptake of cycling continues to improve due to initiatives
in schools such as Bikeability.  
Population
and human
health
Deprivation 
While deprivation remains high, available data suggests
deprivation levels have remained broadly stable over time.  
Biodiversity,
fauna and
flora
Tree canopy
cover 
There is no significant change in the area of tree canopy
cover or urban tree canopy cover. However, work is
ongoing at a regional level through Clyde Climate Forest to
increase canopy cover in the longer term.
Soils Peatland 
The overall condition of raised and blanket bogs across the
area is relatively poor with a number of designated sites
recorded as unfavourable. 
Improving  No change  Deteriorating 
68

Page 69

Appendix 2
Changes from 2023 SOE Report
Indicator Status and trend  Comment 2011 2013 2015 2017 2019 2021 2023 2025
Environmental issue: Population and human health
Deprivation Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Improving
Poor Poor
Economy Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Stabilised
Fair Fair
Mortality Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Improving
Poor Poor
Environmental issue: Material assets and landscape
Built facilities         Stabilised
Good Good Good Good Good Good Good Good
Environmental issue: Soils
Peatland Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Stabilised
Poor Poor
Environmental issue: Air, noise and light
Local air
quality         Improving
Fair Fair Fair Fair Fair Fair Fair Good
Light Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Stabilised
Fair Fair
Environmental issue: Water
Water quality         Stabilised
Fair Fair Fair Fair Fair Fair Fair Fair
Environmental issue: Climate change
Energy
consumption         Improving
Fair Fair Fair Fair Fair Fair Fair Fair
Environmental issue: Transport
Public
transport
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail
Not
avail   Improving
Fair Fair 
69

Page 70

70

Page 71

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Director, Health and Social Care
Executive Director (Housing and Technical Resources)  
Subject: The Housing Promise 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 describe and seek approval for a Housing Promise for Care Experienced young
people, consolidating and formalising existing activity already being delivered
and progressed by the Council
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) to approve a Housing Promise for Care Experienced young people as set out in
section 4.2 of the report, noting that this consolidates and formalises existing
activity already being delivered across Housing, Social Work and partner
services, and complements the previously approved Employability Promise.
([1recs]
3. Background
3.1. In 2016, the Scottish Government commissioned an independent Care Review to
identify changes needed in Scotland’s care system. The Review’s seven reports,
published in February 2020, set out improvements to be achieved by 2030 to ensure
children and young people grow up loved, safe, and respected. These conclusions,
known as The Promise, received cross‑party support and the Government committed
to full implementation by 2030. 
3.2. The Promise is a universal commitment across public bodies and political parties to
deliver meaningful change for Care Experienced people and families. Five years on,
Audit Scotland has published a performance audit report drawing on national progress
and offering recommendations for improvement. 
3.3. Audit Scotland’s report identifies persistent challenges in clarity, accountability, and
planning. Roles and responsibilities across organisations remain unclear, while
national plans lack direction, making it difficult to establish collective accountability.
The absence of a strategic assessment of resources, combined with complex
governance structures involving multiple bodies, has weakened oversight and slowed
progress. Efforts by the Scottish Government to streamline governance have not yet
delivered the necessary shift.  
11
71

Page 72

3.4. The report also highlights gaps in embedding the voices of Care Experienced people
into service design, alongside shortcomings in defining, measuring, and monitoring
progress. Disparate and short‑term funding streams hinder effective planning and
impact assessment, while national oversight of local activity remains inconsistent.
Despite these barriers, the workforce is strongly committed to delivering The Promise
but requires greater support to fully realise its potential. 
3.5. Within South Lanarkshire Council, The Promise is embedded as a key theme in the
Children’s Services Plan, supported by the Promise Board and the young people‑led
Champions Board. 
3.6. The Promise Board is chaired by the Chief Executive and attended by Chief Officers
from across partner agencies. It oversees all the work being undertaken across the
partnership to achieve progress within the Children’s Services Plan. To do so, this
Board has developed a corporate parenting strategy to hold all partners to account
based on the principles within The Promise. 
3.7. The Promise Board works closely with South Lanarkshire’s Champions Board. This is
a group of care experienced individuals supported by The Promise Development
Team, a collaboration between Who Cares? Scotland and South Lanarkshire. This
group engages with all partners to place the lived experiences of care experienced
people at the heart of decision making and resource allocation. The Champions Board
has the following aims in relation to Care Experienced People: 
 lifelong support for Care Experienced people in South Lanarkshire
 the voice of the Care Experienced person is at the heart of all decision-making
processes at all levels
 Care Experienced people are supported into long term, suitable housing
 Care Experienced people experience positive mental wellbeing
 Care Experienced people gain successful employment and further/higher
education opportunities 
3.8. A range of innovative local initiatives are driving significant progress for Care
Experienced young people and families, for example: 
 primary schools surpassing national stretch aims in attendance and attainment
 Family Support Hubs – recently recognised with a COSLA award - are reducing
inequalities and achieving notable outcomes through the Whole Family Wellbeing
Approach, including a 67% reduction in pre‑birth investigations and support for
87% of families at the pre‑birth stage
 complementary projects such as Birth Roots are assisting women affected by
adoption and reducing substance‑related harm, while dedicated Care Experience
teachers are strengthening educational outcomes
 the establishment of a Continuing Care and Aftercare Hub provides streamlined
access for young people leaving care, alongside enhanced support for transitions
into further and higher education, collectively demonstrating a preventative,
family‑focused model of care and opportunity 
3.9. In this context, South Lanarkshire Council has adopted a deliberate and practical
approach to implementing The Promise through the consolidation of clear, deliverable
commitments within existing service structures. This approach was reflected in the
Executive Committee’s approval, on 30 April 2025, of an Employability Promise for
Care Experienced young people. 
72

Page 73

3.10. Building on that decision, this report seeks approval to formally affirm a Housing
Promise for Care Experienced young people in South Lanarkshire, that aligns with
and complements the Employability Promise; and that consolidates and formalises
activity already being delivered and progressed by the Council. 
4. Building on Strong Foundations: A Housing Promise
4.1. The Council will, as a corporate parent, deliver a flexible and person‑centred
approach, drawing together and formalising existing work already being delivered
across services, to ensure that all Care Experienced young people have access to
safe, suitable, and sustainable housing options. 
4.2. The core commitments of the South Lanarkshire Housing Promise are that:- 
 Lay Foundations - the Council will strive to ensure that all Care Experienced
young people have an individual Housing Pathway Plan, jointly developed with
Social Work and Housing Services, to support informed choices and smooth
transitions
 Open Doors - the Council will strive to provide every Care Experienced young
person with a dedicated Throughcare Housing Officer from six months prior to
leaving care until at least age 24 (and beyond if required) to offer advice,
guidance, and practical support
 Secure Place - the Council will strive to make sure every Care Experienced young
person leaving care in South Lanarkshire has safe, secure accommodation
without the need to navigate homelessness services
 Step Inside - the Council will strive to offer transitional options for Care
Experienced young people preparing for independent living that build confidence
and readiness for a permanent tenancy
 Tailor Solutions - the Council will strive to work with partners to develop supported
housing models for Care Experienced young people with ongoing high-level
needs, offering a family-style environment with on-site support
 Stay Independent - the Council will strive to put appropriate supports in place for
Care Experienced young people moving into their own tenancy, helping them
sustain housing and build confidence to live independently, with a trauma-
informed approach that respects individual circumstances 
4.3. Rather than signalling a future ambition, affirming a South Lanarkshire Housing
Promise explicitly confirms, consolidates and strengthens the Council’s ongoing
commitment, building on established work since December 2023; and reinforcing a
unified and strategic approach to delivering better outcomes for Care Experienced
young people. 
4.4. Affirming and advancing the Housing Promise positions this activity and these
developments as a key element of South Lanarkshire Council’s enduring commitment
to young people, ensuring they can transition safely, confidently, and successfully into
adulthood. Guided by the values of The Promise, the Council is embedding a
comprehensive pipeline of opportunities that unlocks access to secure housing and
tailored support. From enabling care leavers to step into their own homes to providing
reassurance for those not yet ready for independent living, this integrated approach
seeks to deliver stability, guidance, and resources for every young person to thrive.
By championing these pathways, the Council aims not only to meet immediate housing
needs but to foster lasting confidence, resilience, and opportunity for the future. Below
are examples of initiatives already being advanced.  
73

Page 74

4.5. Barnardo’s South Lanarkshire Futures is a key development project initially funded by
the Big Lottery Fund for a two-year period. The initiative involves South Lanarkshire
Council Housing, Social Work and Barnardo’s working together to provide good quality
transition housing and support to enable young people to successfully move to
independent living when they are ready. The project started in 2024 and initially
supported four Care Experienced young people in transitions flats, with outreach
housing support being provided by Barnardo’s.  During inception of this project, it
quickly became apparent that outreach support, prior to moving to transition flats
would be beneficial for young people identified for the project.  This allowed an
opportunity for the Barnardo’s worker to build trust and relationships with the young
people, answer questions and ensure they were confident to take the next step into
the transition flat.
The project showed early signs of success with several young people successfully
moving on within one year to their own tenancy. A further success relates to the young
people who were initially identified and who then felt unsure about the move, through
the outreach work carried out by Barnardo’s and the Throughcare Housing Officer a
number of those who did not feel ready to move were ready to move when the
transition flats became available again. 
4.6. The impact of these developments are illustrated by the following live-experience
testimony: 
“My experience in the transition flat has been the best. It’s taught me how to be more
independent, and the support I’ve received through Barnardos has been so
heartwarming and helpful and they’re very resourceful. If they don’t know anything
specifically, they will learn more about it just to help you.” 
My experience with Barnardos has been nothing short of amazing, they have assisted
and supported me so much. Supporting me to make phone calls, encourage me to
keep my space clean and tidy and sharing helpful tips and tricks along the way. I
wouldn’t be where I am today since moving out of the care system without this
outreach support.” 
“Living within the flat was scary at first, I’m used to having a lot of noise around me,
so it was different when I closed my door and there was silence. I got a chance to see
that being alone can be a good thing.” 
“I would ask anybody to give this a try it is the best thing that I have ever done. I have
learnt a lot about myself and things that I worried about I can now see that I can do
them on my own. Your support has shown me what I can do and feel more confident
now.” 
4.7. Based on the early success, it was agreed by all the partners involved to expand the
project in 2025. The project now has capacity to support a total of eight young people
in transition flats as well as to provide outreach support to young people identified as
potential participants in the project.  This outreach support is essential in helping build
confidence and to ensure young people make informed choices and decisions about
their future.  This collaborative approach ensures that young people are not only given
a safe place to live but also the structured support they need to transition successfully
into independence. Good quality housing combined with ongoing, personalised
support is essential, as it provides stability and nurtures the confidence and resilience
required for young people to thrive in adulthood. 
74

Page 75

4.8. South Lanarkshire Housing and Technical Resources and the Health and Social Care
Partnership / Social Work Resources have strengthened their approach to supporting
Care Experienced young people and now have in place a Throughcare and Aftercare
Protocol to ensure no young person leaving care in South Lanarkshire needs to
present as homeless.  The Protocol makes provision for Housing and Social Work to
jointly assess the needs and aspirations of young people and to provide them with the
necessary information, guidance and support to make informed choices about their
future housing options.  There are 1.5 Full-time Equivalent dedicated Throughcare
Housing Officers working with Care Experienced young people to provide them with
detailed housing options advice and assistance.  These officers help support young
people from initial contact right through to them signing up for their tenancy. This
consistent, dedicated resource has significantly improved outcomes for care
experienced young people with 100% of all applicants now receiving a Housing
Pathway Plan. 
4.9. At its meeting of 6 May 2026, the Social Work Resources Committee was updated on
Social Work Children and Families’ Care Close to Home approach, and then
approved:- 
 progression of a partnership agreement with Barnardo’s Gap Homes Project to
build five homes in the proposed site in Blantyre and the associated programme
(subject to the lease agreement being approved by the Housing and Technical
Resources Committee); and 
 the programme to install five independent modular homes within the grounds of
four Council children’s homes (Langlea, Hillhouse, Station Road and Hunters
Crescent), using funding approved by Council in February 2026 to help Care
Experienced young people prepare for living independently before moving into
their own home. 
4.10. These developments provide a co-ordinated approach to expanding high‑quality, local
accommodation for care‑experienced young people. The Gap Homes Project will
introduce a new supported living model for young people with higher‑level needs who
require an alternative to traditional residential or transitional provision; while modular
homes would offer a complementary route for those in South Lanarkshire’s children’s
houses who need a gradual, supported transition towards independence. Taken
together, these initiatives respond to distinct but interconnected priorities identified by
Care Experienced young people and will strengthen local capacity, reduce reliance on
external placements, and support smoother, relationship‑based transitions into
adulthood. 
4.11. South Lanarkshire Council and key partners will continue to develop options for young
people leaving care and for young people who do not wish to remain in continuing care
placements in line with the key principles of safe and supportive transitions for young
people moving on as a key aspect of South Lanarkshire’s Housing Promise. 
5. Employee Implications
5.1.  There is no employee implications associated with this report. 
6. Financial Implications
6.1. As part of the 2026/2027 revenue budget setting on 25 February 2026, the Council
approved £0.500m of one‑off funding for accommodation to help Care Experienced
young people prepare for living independently before moving into their own home.
This allocation underpins the modular homes development (4.9), which was
approved by the Social Work Resources Committee on 6 May 2026. 
75

Page 76

6.2. There are no other financial implications associated with this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environmental
implications in terms of the information contained in this report. 
8. Other Implications
8.1. There are no other implications. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. The South Lanarkshire Housing Promise builds on work already in place since
December 2023 and articulates how the authority is deepening and formalising its
approach to deliver greater consistency and outcomes. As such no integrated impact
assessment is required in respect of this report. 
9.2. Dialogue and engagement have taken place with the South Lanarkshire Champions
Board, and the multi-agency South Lanarkshire Promise Board. 
Professor Soumen Sengupta
Director, Health and Social Care 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
5 May 2026 
Link(s) to Council Values/Priorities/Outcomes
 Our children and young people thrive 
Previous References
 Executive Committee of 30 April 2025
 Social Work Resources Committee of 6 May 2026 
List of Background Papers
 Audit Scotland (2025) Improving care experience: Delivering The Promise
https://audit.scot/publications/improving-care-experience-delivering-the-promise 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Aine McCrea, Head of Children & Justice Services and Chief Social Work Officer
Telephone: 01698 454887
Email: aine.mccrea@southlanarkshire.gov.uk 
Sharon Egan, Head of Housing Services
Telephone: 01698 454595
E-mail: sharon.egan@southlanarkshire.gov.uk 
76

Page 77

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Land and Property Transfers and Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Executive Committee of the actions required in respect of land and
property transactions
1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the land detailed in Appendix A, which will be the subject of a negotiated
transaction, be declared surplus to Council requirements.
[1recs]
3. Background
3.1. Details of land and property, which is potentially suitable for redevelopment or
disposal, are circulated to all Resources and Community Planning Partners to
establish if they are suitable for alternative operational use. 
3.2. Recommendations are made following the consideration of planning, title and other
legal constraints.  Any assets with competing interests are judged against Council
priorities, including the need for capital receipts. 
3.3. Transactions out with the Property Bulletin process, where there is a requirement to
reallocate or declare property surplus as part of minor/adjoining sales, or to facilitate
a Council project, are not circulated through the Property Bulletin, however the
details are included in this report. 
3.4. Transactions are only included in the report after successful consultation with the
holding Resource(s) and Planning. 
4. Non Bulletin Disposals
4.1. Appendix A details an area of land adjacent to 51 Machan Road, Larkhall which is
the subject of the proposed sale to the owner of the adjacent property to allow the
land to be incorporated into the proposed subdivision and redevelopment of a former
nursery for commercial use. The proposal has a planning consent (ref P/25/1121)
and the Council’s land is required for additional parking.
12
77

Page 78

4.2 The land was included in the Land and Property Transfers and Disposals report at
the Executive Committee on 1 April 2026, where the Committee decided it was to be
continued to a future meeting to allow further engagement with all local members,
clarification on pedestrian and road safety implications including any mitigation
measures, consideration of the impact on remaining open greenspace and further
explanation regarding previous interest in the land. 
4.3  Through further discussions with the local members, clarification on the extent of the
consultation process both in respect of the request to acquire the land and the
planning application was provided and discussed. These discussions allayed
concerns raised and a consensus was obtained to progress the proposed negotiated
sale, subject to Committee approval to declare the land surplus. 
5.  Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. A capital receipts for the General Services Account will be secured through the
disposal identified in this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There were no climate change, sustainability or environmental implications as a
result of this report. 
8. Other Implications
8.1. There is a low risk that the capital receipt anticipated, as a result of declaring this
land surplus, may not be realised if, for reasons out with the Council’s control, the
purchasers choose not to proceed with the transactions.  However, the procedures
and consultations described in Sections 3 and 8 of this report have been
implemented to minimise this risk. 
8.2. There are no significant issues in terms of sustainability arising from this report. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. Consultation was undertaken with Planning, Roads, Legal, and the respective
holding resource prior to the inclusion in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
27 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Executive Committee of 1 April 2026
78

Page 79

List of Background Papers
 Plans of the land and property referred to in this report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Gerry McParland, Property Services Manager (Assets and Estates)
Ext: 5177  (Tel: 01698 455177)
E-mail:  gerry.mcparland@southlanarkshire.gov.uk 
79

Page 80

APPENDIX A - Land 
NON BULLETIN DISPOSALS 
Area  Description Holding
Account
Proposal Value
Band
579 sq m Land adjacent to 51 Machan
Road, Larkhall
Community
and
Enterprise
Car parking for
redevelopment of
former nursery
4
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
80

Page 81

81

Page 82

82

Page 83

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Summer of Sport 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform the Executive Committee of the draft programme of events being proposed
across South Lanarkshire using the Summer of Sport funding from Sportscotland 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the programme of planned events, as shown in Appendix 1, be approved. 
[1recs]
3. Background
3.1. Following the recent confirmation of the Scottish Government Budget on 25 February
2026, sportscotland will be allocating local partners a one-off, single-year investment
for the Summer of Sport. 
3.2. This £12 million budget will be distributed across all 32 local authorities to celebrate
and capitalise on a spectacular Summer of Sport, providing accessible and inclusive
sporting opportunities for children and young people. 
3.3. South Lanarkshire Council will be allocated £713,000 for the 2026/2027 financial year.
This allocation is based on a funding formula agreed by sportscotland, the Scottish
Government and COSLA. Funding should be utilised from June 2026 to March 2027. 
3.4. The intent of the policy is to provide free or reduced cost activity, inclusive
opportunities for children and young people aged 3-26 to get active, stay active and
improve their lives, with a particular focus on reducing barriers to participation and
addressing poverty-related inequality. At present, it is envisaged that the activities
across South Lanarkshire will be free. The investment is designed to strengthen
pathways into sustained participation in school, club, and community sport. The key
principles of the funding centre on partnership, co-creation, inclusion and
sustainability. 
3.5. Clubs affiliated with South Lanarkshire Leisure and Culture’s (SLLC’s) Club SL
programme will have the opportunity to apply for grants to deliver to targeted groups
in line with the guidance supported by sportscotland. 
13
83

Page 84

4. Programme of Events
4.1. SLLC, as the Council’s lead partner in sport and physical activity, have played a key
role in developing a draft programme of events, in partnership with officers within
Education Resources, which aligns with the priorities set out within the Summer of
Sport guidance. A copy of the draft programme is attached as Appendix 1. 
4.2. Programme communications will be delivered by the SLLC marketing team in
conjunction with the Council’s communications team, connected directly with the
Summer of Sport Marketing via sportscotland to ensure branding and one-off funding
aligned. 
5. Governance
5.1. Arrangements will fall in line with the existing sportscotland reporting framework which
consists of both a financial performance tracker, which is signed off by South
Lanarkshire Council’s Head of Finance, and the Active Schools Monitoring Outcomes
Report. This is in addition to both South Lanarkshire-specific and regional liaison
meetings with the SLLC sportscotland Partnership Manager. 
6. Monitoring of Performance
6.1. To understand the impact of the Summer of Sport funding, local authorities will be
asked to use existing data collation methods to provide information on a focussed set
of data relevant to the funding. Information such as, but not limited to: 
 number and range of delivery partners
 number and range of sessions delivered
 number of children and families engaged (including % from target groups)
 number of new coaches and volunteers engaged. 
6.2. This will be supported by a national participant survey and a proposed wider externally
commissioned evaluation which partners may be asked to engage in. 
7. Employee Implications
7.1. There are no employee implications. It is anticipated that the rollout will be mainly
handled from within the current SLLC structure. However, there will be a number of
fixed term contracts in addition to assist with both programming and delivery. 
8. Financial Implications
8.1. There is an allocation of £713,000 from the Scottish Government for the Summer of
Sport rollout in South Lanarkshire. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no climate change, sustainability and environmental implications. 
10. Other Implications
10.1. There are no risks or other implications as a result of this report. 
11. Integrated Impact Assessment and Consultation Requirements
11. There are no impact assessment or consultation requirements as a result of this
report. 
84

Page 85

Kevin Carr
Executive Director (Community and Enterprise Resources) 
29 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kevin Carr, Executive Director (Community and Enterprise Resources)
kevin.carr@southlanarkshireleisure.co.uk 
85

Page 86

Appendix 1 
Activity Target Group  Key contact  Partner
Ice skating  Universal  Stephen Fisher  SLLC
Heritage Park
(Boating activities and
education sessions
with raft building, water
activities/water safety)
Universal/Care
Experienced YP Garry Rodmell  SLC
Outdoor Learning &
Adventure 
(Kayaking, abseiling,
water sports, camping)
Targeted -Referral basis
via social work/YCFL
referral  Scott Russell YCFL
World Cup Inspired
Football sessions 
Universal - SIMD/Rural
focus  Active Schools  Education 
Commonwealth
Games multi-sports Universal /Club focused  Sports Development 
Scottish Governing
Bodies/Residents
groups/3rd sector
Golf  Universal /Targeted  Colin Girvan  YCFL
Coach Education  Universal /Targeted  Barbara Clark
Steven Percy  
Employability/ Scottish
Governing bodies 
Employability
opportunities 
Lifeguard 
Swim Teacher 
Dancer Leader
Lead Sports Coach  
Active Schools 
Sports Development 
Leadership
enhancement 
PE Departments/
Education  
Local Club
memberships through
CubSL
(affiliation/governance  
process)
Targeted  Clubs & Communities
team 
Clubs 
Scottish Governing
Bodies 
Club funding grants
/Our Place our Plan
Groups
Universal  Clubs & Communities
team 
Sportscotland
Scottish Governing
Bodies
OPOP groups 
Sporting Equipment to
all schools in South
Lanarkshire 
Universal  Active Schools  Education 
Youth Family
Community Learning
offering to widen
service offer 
Access to wide range of
service for free   Michelle Turnbull YCFL
Bespoke offering via
mapping 
Utilising our current
data to ensure areas of
low income, ASN and
care experienced
groups have activities
located within
communities. 
Focus on activities
utilising spaces
connected to
communities 
Memberships  
Libraries/Leisure
Centre/community halls
SLLC
Communities and
Education team
Our Place Our Plan
groups 
86

Page 87

Activity Target Group  Key contact  Partner 
Leadership 
Enhancing our current
offer: 
Sports Coach Academy 
Dance Leaders
Netball Academy
Sports Leaders 
Young Peoples Sport
Panel 
Volunteering
Active Schools 
PE departments
/Scottish Governing
Bodies  
ASN Offering
Enhancement 
Enhancing our current
programme 
ASN ACE Offering
Holiday club support for
families 
Christmas holiday
support for families
Considering wider
offering to ensure
equipment/staff training
can ensure all ASN
pupils have
opportunities 
Active Schools/Sports
Development /Health
Team
Education /Social work
/NHS
Development Officer
Administration Officer 
Casual (non-
contracted) recruitment
where needed 
(9months)
Ensuring compliance
with ClubSL
Adding clubs/Groups as
suppliers on Fusion 
Monitoring and
evaluation in line with
Sportscotland Funding
criteria.
The funding will be
manged by Michelle
Turnbull (Active Schools
and Outdoor Learning
and Adventure
Manager) 
SLLC
Youth Community
Family Learning
Health (NHS)
Education  
Social Work
Scottish Governing
Bodies
Sportscotland
Fire and Rescue 
Our Place Our Plan 
groups 
Additional partners tbc   
Wider experiences  Away day experiences
for targeted groups  Education  
Outdoor Recreation
Assistance with football
pitch openings (on
grass) to ensure
nets/lines are available 
Andy House  Housing & Tech 
87

Page 88

88

Page 89

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Amendments to Membership of Committees 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for a proposed change in the membership of the Education
Resources Committee and Social Work Resources Committee
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that Councillor Brown replace Councillor McGeever on the Education
Resources Committee; and
(2) that Councillor McGeever replace Councillor Brown on the Social Work
Resources Committee, with Councillor Brown becoming a substitute member. 
3. Background
3.1. Following a request received from the Leader of the Liberal Democrat Group on 30
April 2026, it is proposed that Councillor Brown replaces Councillor McGeever on the
Education Resources Committee and that Councillor McGeever replaces Councillor
Brown on the Social Work Resources Committee, with Councillor Brown becoming a
substitute member. 
4. Employee Implications
4.1. There are no employee implications in terms of this report. 
5. Financial Implications
5.1. There are no financial implications in terms of this report. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no climate change, sustainability or environmental implications in terms of
this report. 
7. Other Implications
7.1. There are no implications in terms of risk.  
14
89

Page 90

8. Integrated Impact Assessment and Consultation Arrangements
8.1. There was no requirement to carry out an integrated impact assessment or formal
consultation process. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
30 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Tracy Slater, Administration Adviser
Tel:  07385 370089
E-mail: tracy.slater@southlanarkshire.gov.uk 
90

Page 91

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 20 May 2026
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Update on Corporate Asset Management Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee in respect of the Corporate Asset Management Plan 2021 to
2026, including the Local Government Benchmarking Framework (LGBF)
indicator outcomes for Property Condition and Suitability
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the update of the Corporate Asset Management Plan 2021 to 2026,
including the Local Government Benchmarking Framework (LGBF) Iidicator
outcomes for Property Condition and Suitability, be noted;
(2) that the proposal to bring forward a new 10-year Estates Strategy 2026 to
2036, be noted; and
(3) that the Property Asset Management Plan 2025 update, attached at Appendix
1 be noted. 
3. Background
3.1. The Executive Committee, at its meeting held on 22 September 2010, approved the
implementation of an extended model for Corporate Asset Management from 2011.
This included developing Asset Management Plans (AMPs) across a number of
service areas, in line with Chartered Institute of Public Finance and Accountancy
(CiPFA) guidance and summarised, under an overarching Corporate Asset
Management Plan, which demonstrates how each asset type supports the Council’s
corporate objectives. The Service areas included within the Corporate Asset
Management Plan are Property and Housing, Roads Infrastructure, Fleet and
Information and Communication Technology. 
3.2. The Corporate Asset Management Plan details the objectives which direct asset
management and the structures which support it.  The detail of the strategies and
priorities for individual asset groups can be obtained from the detailed plan which
has been prepared for each category, and which are linked to the Corporate Plan. 
4. Corporate Asset Management Plan 2021
4.1. The 2021 Corporate Asset Management Plan is the seventh full Corporate Plan and
detailed the objectives which have directed asset management and the structures
which support it during 2021 to 2026.  The details of the strategies and priorities are
covered in their respective plans, and summaries are provided below. 
15
91

Page 92

4.2. Property and Housing Asset Management 
4.2.1 The Property Asset Management Plan 2025 update is attached at Appendix 1.
Property Asset Management is divided into two key sections: direct operational
property and the lease portfolio for which a separate management plan has been
prepared. The operational property portfolio currently comprises 328 establishments
from which a Council service is delivered.  These are recognised establishments
within the Council, which may comprise more than one building or accommodate
multiple Resources and uses. 
4.2.2  Within the Property Asset Management Plan, operational properties are assessed
on Core Facts for Condition and Suitability.  Condition is assessed on an
establishment basis and provides an overall rating for the property based on an
elemental assessment carried out by qualified surveyors. Suitability is an
assessment by Resources of how well the property supports current service delivery
in terms of design, layout and location. The number of service interests within the
operational establishments is 498. 
4.2.3 Property Services also manages a tenanted, non-residential, lease portfolio, known
as the ‘Estates Portfolio’, which consists of 715 properties. The role of this portfolio,
which comprises of a wide range of property interests from ground rents for major
retail developments through to business centres, is to support the economic and
social objectives of the Council as well as meeting corporate financial targets. 
4.2.4 A 10-year Estate Strategy is currently being finalised and will inform and guide future
land/property decisions on the investment, rationalisation, co-location, and disposal
of assets, taking account of community, financial and service considerations. It
should be stressed that the process of estates assessment will be ongoing and
iterative over the lifetime of the Strategy and will promote a strategic and outcome
focussed methodology to Asset Management and the new Corporate Asset Strategy. 
4.2.5 The Housing Asset Management Plan was developed to complement and inform the
Housing Business Plan and to set out priorities for the physical care and
improvement of the housing stock and related assets. The Plan details the priorities
for the current housing portfolio which extends to 26,169 homes (as at 31/3/2026).
This is a movement from the previous year’s total of 25,825 homes and reflects 111
New Build properties and 133 Purchases. 
4.3 Roads Asset Management Plan
4.3.1 The Road Asset Management Plan (RAMP) is a strategic framework that outlines the
key principles and practices for the effective management, maintenance, and
enhancement of our road network and related infrastructure. The development of
RAMPs across Scotland is an excellent example of collaborative working across all
32 councils.  
4.3.2 The five key principles of an effective RAMP are:- 
1. Lifecycle Approach: Manage assets from over the asset's entire life. 
2. Prioritisation Based on Risk: Assess and manage risks related to safety,
performance, and financial impact ensuring critical assets are maintained to
prevent failures and service disruptions. 
3. Informed Decision Making: Utilise accurate, up-to-date data to inform
maintenance schedules and investment decisions. 
92

Page 93

4. Cost-Effectiveness: Focus on achieving the best possible value from
investments, considering both short-term maintenance needs and long-term
capital investment.  
5. Sustainability and Resilience: Integrate sustainability by minimising
environmental impacts, promoting resource efficiency, and ensuring roads are
resilient to climate change and extreme weather events. 
4.4 Fleet Asset Management Plan
4.4.1 The Fleet Asset Management Plan provides a key source of information and
direction on vehicles and is key in determining strategic decisions and defining how
the fleet assets are efficiently and effectively utilised. This will ensure that vehicles
provide resilient services to meet the changing needs of the Council. 
4.4.2 As part of ongoing transformational workstreams, a new Fleet Strategy is under
development and will be completed in August 2026, and is planned to be presented
to the Community and Enterprise Resources Committee on 1 September 2026.   An
opportunity is being taken to dovetail the annual Fleet Asset Management Plan with
this new Strategy.  The proposed Fleet Asset Management Plan 2026/2027 will set
out the Council’s current fleet position, principal risks and priorities for action. 
4.4.3  The Council operates 1,357 vehicles across more than 40 vehicle types, including
172 vehicles above 3.5 tonnes managed within statutory Operator’s Licence
requirements. Fleet assets, therefore, support both frontline service delivery and the
Council’s legal, financial and reputational responsibilities. The most significant
strategic pressure is the age and replacement profile of the fleet. 
4.4.4 The Council has strong foundations for improvement, and this will form the basis of
the Fleet Strategy and annual Asset Management Plans and the central requirement
for 2026/2027 and beyond is to translate those foundations into tighter control over
replacement, compliance, utilisation, avoidable revenue pressures and operationally
viable decarbonisation. 
4.5 Information and Communication Technology (ICT) Asset Management Plan
4.5.1 The ICT Asset Management Plan aims to put in place effective ICT asset
management processes which enable high quality ICT services to be provided to
meet the needs of the Council. The Plan outlines the priorities and strategies
required to develop and support the ICT asset estate whilst ensuring business and
service continuity. The plan highlights the key actions planned annually, ensuring
that the Council’s ICT Assets are fit for purpose. 
4.5.2 The key actions identified in the 2025/2026 plan can be summarised as follows:- 
1. Upgrade legacy software versions: This involves updating software versions that
have reached the end of their lifecycle to ensure continued support and
functionality. 
2. Replace legacy servers: This action focuses on replacing servers that are no
longer supported to maintain system reliability and performance.  
3. Rollout Windows 11: This entails upgrading desktop equipment from Windows 10
to Windows 11 to comply with security mandates and enhance user experience.  
4. Replace remaining analogue lines: This involves replacing analogue lines with
digital ones in line with the Digital changeover 2025 to ensure continued service.  
5. Replace smartphones no longer under support: This entails refreshing
smartphones that are no longer supported to ensure they can receive the latest
operating system and security patches.
93

Page 94

5. Employee Implications
5.1 There are no employee implications. 
6. Financial Implications
6.1 The details of the plans have influenced investment decisions, and formation of
financial plan to support these asset strategies, but there are no direct Financial
Implications from the production of the AMP. 
7 Climate Change, Sustainability and Environmental Implications
7.1 There are no implications for climate change, sustainability or the environment in
terms of the information contained within the report. 
8 Other Implications
8.1 The Asset Management Plans assist the Council in managing its assets, efficiently
and effectively to deliver best value. It also helps manage risk across its asset base. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
24 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Previous References
 Executive Committee of 22 September 2010
 Executive Committee of 7 September 2016 
List of Background Papers
 Appendix 1 - The Property Asset Management Plan 2025 update 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Craig Jardine, Head of Property Services
Ext: 4073   (Tel: 01698 454073)
email: craig.jardine@southlanarkshire.gov.uk 
94

Page 95

Housing and Technical Resources
Executive Director: Stephen Gibson 
Property Asset Management Plan 2021-2026 
2025 Update 
Appendix 1 
15
95

Page 96

PART 1: PERFORMANCE UPDATE 
Table 1: Condition Core Fact 
2025 2024  
Condition Category  Number of
properties by
category
Percentage 
by 
category
Number of
properties by
category
Percentage 
by 
category
Direction of
Travel
Comment
A Good - Performing well and
operating effectively.
101 30.8% 116 35.2%  The table demonstrates that 86.9% of
properties are in satisfactory
condition, an increase from 85.8% in
2024. Despite the current financial
climate and reduced funding to
Scottish Local Authorities, the figures
show that, through programmes of
Prioritised Capital Investment,
Lifecycle Maintenance, Planned
Preventative Maintenance and
Rationalisation, performance remains
positive for the majority of categories
of property. 
B Satisfactory - Performing
adequately but showing minor
deterioration.
184 56.1% 167 50.6% 
C Poor - Showing major
defects and/or not operating
adequately
39 11.9% 43  13.0% 
D Bad - Economic life expired
and/or risk of failure
4 1.2% 4 1.2%  
Totals 328 100% 330 100%  
96

Page 97

Table 2: Suitability Core Fact 
2025 2024  
Suitability Category  Number of
properties by
category
Percentage 
by 
category
Number of
properties by
category
Percentage 
by 
category
Direction of
Travel
Comment
A Good - Performing well and
operating effectively.
282 56.6% 283 54.7%  The table demonstrates that 95.4% of
properties support delivery of services
in terms of suitability, a slight decrease
from 95.8% in 2024. Continued
implementation of the council’s asset
management strategy and plans has
resulted in a clear focus in optimising
council buildings to ensure they are
suitable. 
B Satisfactory - Performing
well but with minor problems.
133 26.7% 144 27.8% 
C Poor - Showing major
problems and/or not
operating optimally
60 12.1% 69 13.3% 
D Bad - Does not support the
delivery of services 
23 4.6% 22 4.2% 
Totals 498 100% 518 100%  
97

Page 98

Table 3: Local Government Benchmarking Framework Indicators: Condition 
Measure 2025 2024 Direction of
Travel
Comment
Gross Internal Floor Area of
Operational Buildings (m2)
694,199 699,174  The table indicates 90.3% of
properties are in a satisfactory
condition, no change from the
previous year. The restrictions placed
on budgets will provide challenges to
sustained performance going forward.
However, measures are in place
through our Asset Management
Strategy to mitigate any risks and
sustain service delivery. 
Proportion of GIA that is in
Satisfactory Condition (m2)
626,800 631,190 
Percentage of Internal Floor
Area of Operational Buildings in
Satisfactory Condition
90.3% 90.3%  
Table 4: Local Government Benchmarking Framework Indicators: Suitability 
Measure 2025 2024 Direction of
Travel
Comment
Total Number of Operational
Buildings
498 518  The table indicates 95.4% of
properties support delivery of services
in terms of suitability, a slight
decrease from 95.7% in 2024.
Continued implementation of the
Council’s asset management strategy
and plans has resulted in a clear focus
in optimising Council buildings to
ensure they are suitable. 
Number of Operational Buildings
that are Suitable for Their
Current Use
475 496 
Percentage of Operational
Buildings that are Suitable for
Their Current Use
95.4% 95.7% 
98

Page 99

Table 5: Property Costs 
Measure 2025 2024 Direction of
Travel
Comment
Gross Property Costs of the
Operational Estate as a
percentage of the Council’s
Gross Revenue Budget.
7.58% 6.30%  Compared to FY 2023/24, the
average cost per kWh for gas
increased by 9.1% for FY 2024/25 and
for electricity the average cost per
kWh increased by 11.7%.  Total cost of Repairs and
Maintenance
£7.237m £7.643m 
Energy/Carbon Costs £24.913m £23.440m  
Table 6: Estates Management 
Measure 2025 2024 Direction of
Travel
Comment
Percentage of lease portfolio
properties that are void
11.7% 10.3%  Demand for industrial properties and
ground remains high. Retail is
similarly strong in smaller traditional
units (e.g. tenemental properties) in
areas out with shopping centres. 
There is an increasing turnover in
business centres/ offices as tenants
adjust to post covid hybrid working
arrangements.
Percentage debt of invoiced
income
8.16% 8.4% 
Total Value of Capital Receipts £7.572m £1.837m 
99

Page 100

Table 7: Energy Management 
• A means to gauge a building’s energy efficiency is by its Energy Performance Certificate (EPC) rating which provides an energy rating of the
building on a sliding scale from A to G, where A is very efficient and G is the least efficient.  The better the EPC rating, the more energy
efficient the building’s design and construction is, and the lower its carbon emissions and energy costs are likely to be. The table below
summarises the 2025 position 
2025 2024
EPC Rating Number Number
A+ 1 7
A 18 29
B+ 11 24
B 15 42
C+ 21 23
C 7 11
D+ 9 1
D 8 13
E+ 6 7
E 2 10
F+ 9 1
F 9 17
G 73 60
Carbon Neutral 1 0
No Rating 138 85
Total 328 330 
• Central Energy Efficiency Fund (CEEF) was launched in 2004 by the Scottish Government as a new Public Sector Energy Efficiency Initiative.  The
funding has been used to establish a revolving fund continues to drive an energy efficiency investment programme.
• Energy efficiency is essential to meeting the ambitious targets of the Climate Change (Scotland) Act 2009. All new builds are to meet Building
Standards Section 6 and 7 (Silver Sustainability Label).  The energy running costs of our older less efficient building stock is a key consideration
when programming buildings’ disposals and sales. 
• These are considerations which will be integral to the Estates Strategy Review and the Net Zero journey.
100

Page 101

Table 8: Community Asset Transfer 
Measure 2025 2024 Direction of
Travel
Comment
Total number of applications
received
16  8  Community Asset Transfer is
reported annually to the Scottish
Government at the end of June. 
South Lanarkshire Council has
promoted Community Asset
Transfer through the council and
community planning websites. 
Number of successful
applications determined
9 5 
Number received and yet to 
be determined
4 1 
Number of unsuccessful
applications determined
2 1 
Number of applications
withdrawn
1 1  
101

Page 102

PART 2: ACTION PLAN 
A, Action Plan – Strategic 
Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
A1 Development of a 10-year
Office Accommodation
Strategy.
Plan and manage
property as a corporate
resource to deliver the
Council’s outcomes.
Develop proposals to
further reduce the office
portfolio.
Ongoing identification of potential
surplus accommodation to reduce
occupational space. 
A2 Complete a review on
impact of agile working on
office requirements.
Plan and manage
property as a corporate
resource to deliver the
Council’s outcomes.
Develop proposals that
ensure working
arrangements within the
Council are based on
service need.
Following guidance on the agile
working at Executive Committee, an
audit of current workspace and
potential Resource requirements is
underway to align office provision in
advance of implementation in October
2025. 
A3 Implement the Council’s
sustainable development
and carbon management
plans and strategies,
ensuring the Council’s
properties are fully
accessible and contribute
to short, medium- and
long-term carbon reduction
targets. 
Ensure our current
property and future
estate is as sustainable
as possible in design,
construction, operation
and final disposal.
The council will continue
to maximise opportunities
to enhance sustainability
within its new domestic
and non-domestic
buildings within the
budget parameters
available and through
identifying appropriate
external funding
opportunities. 
Regular updates provided to the
Climate Change and Sustainability
Committee.
102

Page 103

Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
A4 Continue to implement the
Council’s 10-year Capital
Investment Strategy. 
Plan and manage
property as a corporate
resource to deliver the
Council’s outcomes. 
Planned investment in
core assets.
New priorities identified and
Investment Strategy updated.
A5 Asset Review and
Challenge –
Rationalisation of the
Council’s asset portfolio. 
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Identification of sites for
new build social housing,
co-location and disposal.
Ongoing feasibility assessments of
surplus land/property and
underutilised land for potential new
build housing sites. 
A6 Review of homeless
accommodation.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Identification of sites to
support the newly
emerging homelessness
accommodation model.
The former Clydesdale Hotel has
been identified for acquisition for the 
provision of First Stop homeless
accommodation.
A site at Harriet Street, Rutherglen
has been identified for a partnership
project with Social Bite.
A7 Partnership working Promote joint working
where it will provide
benefit for service
delivery and in securing
efficiencies.
Explore options for co-
location across South
Lanarkshire with Police
Scotland.
Ongoing. 
A8 Produce an energy
demand reduction plan for
council buildings.
Ensure our current
property and future
estate is as sustainable
as possible in design,
construction, operation
and final disposal.
The new plan outlines key
actions to promote
behavioural change
across council
departments alongside
considering physical
changes required to
Progress reported through the
Climate Change and Sustainability
Committee - latest update provided
February 2024.
103

Page 104

improve council building
efficiency.
B. Action Plan – Operational/Service Improvement 
Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B1 Identify a future
programme of disposals in
line with the Capital
Receipts targets.
Manage and maintain
property effectively and
efficiently, together with
optimising financial
return and commercial
opportunities from the
rationalisation and
disposal of property. 
Agreed Capital Receipt
programme with Finance.
Capital Receipts target for 2024/25
achieved and exceeded. 
2025/26 - Continue identification of
Capital Receipts opportunities and
disposal of existing surplus property. 
B2 Develop an Integrated
Housing and Property
Management System.
Plan and manage
property as a corporate
resource to deliver the
Council’s outcomes.
Move towards a single
system and removal of
outdated separate
systems.
Property Services (Assets & Estates)
progressing Property Management
system to replace all existing systems
for non-housing properties. 
B3 Lifecycle Replacement –
Schools.  Manage and maintain
property effectively and
efficiently, together with
optimising financial
return and commercial
opportunities from the
rationalisation and
disposal of property. 
Develop a programme of
replacement for
major elements of
infrastructure.
5-year programme developed.
Priorities will be reviewed at the start
of each financial year. 
104

Page 105

Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B4 Develop a demolition
programme and identify
funding options. 
Manage and maintain
property effectively and
efficiently, together with
optimising financial
return and commercial
opportunities from the
rationalisation and
disposal of property. 
Removal of outstanding
liabilities.
Demolitions to date include Crawford
and Leadhills Public Toilets and Forth
Shelter.
B5 Completion of the 1140
Hours Early Learning and
Childcare Programme
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future. 
Completed June 2024. Complete.
B6 Review the approach to
reporting on Common
Good assets.
Plan and manage
property as a corporate
resource to deliver the
Council’s outcomes. 
Implement agreed
reporting model
Ongoing.
B7 Consult and engage with
community groups who
have indicated an active
interest in community
asset transfer.
Manage and maintain
property effectively and
efficiently, together with
optimising financial
return and commercial
opportunities from the
rationalisation and
disposal of property.
Support a minimum of 2
community organisations
to achieve successful
Community Asset
Transfer.
Community Asset Transfer Fund used
to support community organisations
develop proposals. 
105

Page 106

Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B8 Review of Community and
Enterprise Depots, civic
amenity sites and salt barn
facilities to identify best
investment options.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future. 
Service requirement brief
and identification of
funding options. Potential
Capital Bid
The depot review is operating as a
sub-group of the overarching Estates
Strategy. Review extended to include
H&TR Business Units. The emerging
data from the depot review supports
the proposal to explore a
rationalisation opportunity within the
Clydesdale area. 
B9 Review of day care
centres.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Implement actions
identified through review
being undertaken by
Social Work.
Reduction in the number of Day
Centres to 9 sites. Jenny McLachlan
closed and handed back to Hanover,
September 2024. Whitehill’s lease
ended 31 October 2025 when the
building will be handed back to
Hanover. St Andrew’s, Saltire and
Ashley Grant were decommissioned
and a request made to add all 3
properties to the Council’s property
bulletin. Parkhall, previously Older
People’s Day Centre, is now the East
Kilbride Family Support Hub. The
Nisbet Centre has been demolished.
McClymont was decommissioned in
November 2024 and now subject to a
proposed Community Asset Transfer 
Assess works to be undertaken to
maintain the remaining Day Centres.
106

Page 107

Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B10 Review of proposed care
home replacement
programme including
investment in those being
retained.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Implement actions
identified through review
being undertaken by
Social Work.
McClymont House was
decommissioned in November 2024
and added to the Council’s property
bulletin.  The property is now subject
to a proposed Community Asset
Transfer to Healthy Valleys for a
Community Hub. 
Assess works to be undertaken to
maintain the remaining 3 Residential
Care Homes (McKillop, Meldrum and
David Walker Gardens).
B11 Red Deer Centre Decommission the Red
Deer premises once
alternative premises
have been found for all
existing groups using
the building, inclusive of
the Bowling Club.
Decommission building
and site to be considered
as a future social housing
development as part of
SHIP Plans
No activities in Red Deer since
September 2024 with the building fully
decommissioned and demolished.
B12 Children’s Houses Manage and maintain
property effectively and
efficiently, together with
optimising financial
return and commercial
opportunities from the
rationalisation and
disposal of property
Undertake assessment of
the current 6 children’s
houses to project any
potential future work that
may require to be
factored in future plans
Undertake audit of the condition of the
6 children’s houses.
B13 Review investment
required in Universal
Connections facilities to
Provide the right
property, fit for purpose,
in the right place, to
Service requirement brief
and identification of
funding options.
Project to upgrade and improve
Rutherglen Universal Connections
107

Page 108

maximise their potential in
delivering the Councils
Community Learning and
Development Initiatives.
meet current service
needs and to plan for
the future.
being developed and funding
opportunities identified.
Action
No.
Action Description Key Asset Management
Strategy Objective
Outcome  Progress
B14 Plan and Manage Early
years, Primary School and
Secondary School
expansions to meet the
education needs of the
new SLC Community
Growth Areas and other
large scale housing
developments.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Completion by March
2026
Ongoing. 
B15 Undertake adaptations and
extensions to Educational
Property to meet planned
growth and changing
requirements of pupils.
Provide the right
property, fit for purpose,
in the right place, to
meet current service
needs and to plan for
the future.
Programme of capital
works to be developed.
Adaptations complete at Holy Cross,
St Andrews and St Brides, St John
Ogilvie and Stonelaw (Stonelaw
completion date October 2025) to
increase capacity. 
Extensions to Holy Cross and St
Andrew’s and St Bride’s are currently
at design/tender stage. Target
construction date early 2026. 
Extension to Calderglen on hold as
current pupil projections indicate
extension not required in short term.  
Expansion at Uddingston. Design to
be developed for March 2026. 
108

Page 109

Phone: 0303 123 1015 
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk
109

Page 110

110

Page 111

Report
Agenda Item 
Report to: Executive Committee
Date: 20 May 2026
Prepared by: Executive Director (Finance and Corporate Resources)  
Subject: Integration Joint Boards – Extension of Voting Rights
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Public Bodies (Joint Working) (Integration Joint
Boards) (Scotland) Amendment Order 2025, which has been made by the
Scottish Ministers and is scheduled to come into force on 1 September 2026 
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):- 
(1) that the update provided on the Public Bodies (Joint Working) (Integration
Joint Boards) (Scotland) Amendment Order 2025 be noted; and
(2) to note that officers will provide further engagement and reporting to the
Integration Joint Board as appropriate to support implementation. 
3. Background
3.1. The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Amendment
Order 2025 (SSI 2025/405, the 2025 Order) was made by the Scottish Ministers on
17 December 2025 under powers contained in sections 12(1) and 69(1) of the Public
Bodies (Joint Working) (Scotland) Act 2014. 
3.2. The purpose of the 2025 Order is to extend voting rights on Integration Joint Boards
(IJBs) to include members appointed to represent the third sector, service users and
unpaid carers (referred to in accompanying documentation as “lived experience”
representatives). The instrument also makes related amendments concerning the
resignation of members and proxy arrangements. 
4. Update
4.1. The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Amendment
Order 2025 amends The Public Bodies (Joint Working) (Integration Joint Boards)
(Scotland) Order 2014 to make targeted changes to the composition and voting
arrangements of Integration Joint Boards. 
16
111

Page 112

4.2. In summary, the instrument:- 
 extends voting rights on IJBs to include members appointed to represent the
third sector, service users and unpaid carers, in addition to existing voting
members appointed by the NHS Board and the local authority
 provides for proxy arrangements for all voting and non-voting members, setting
out who may act as a proxy and confirming that proxies attending under the
relevant provisions for voting members may also vote
 clarifies requirements in relation to the resignation of members, ensuring
consistency with the revised voting and membership arrangements 
4.3. The instrument is procedural in nature, focusing on governance and decision‑making
arrangements within IJBs.  It does not alter the statutory accountability of the NHS
Board or the local authority, nor the overall integration framework established under
the Public Bodies (Joint Working) (Scotland) Act 2014. 
4.4. The statutory instrument was accompanied by a Policy Note, which was published at
the point the instrument was laid before the Scottish Parliament on 19 December
2025.  Policy Notes are published alongside Scottish Statutory Instruments to
provide a non‑binding explanation of the purpose of the instrument, the policy
objectives being pursued, the consultation and engagement undertaken, and any
anticipated impacts, in order to assist parliamentary scrutiny and wider
understanding. 
4.5. In line with parliamentary procedure, the instrument was subject to scrutiny by the
Delegated Powers and Law Reform Committee on technical grounds and by the
Health, Social Care and Sport Committee, as the lead committee, on policy grounds
during the 40‑day period following laying.  The instrument will take effect from 1
September 2026. 
4.6. The Policy Note states that, to support implementation, the Scottish Government
intends to review and update the statutory guidance Integration Joint Board: roles,
responsibilities and membership to reflect the change to voting membership. 
4.7. An update was provided to the IJB at its meeting on 31 March 2026.  Officers will
continue to monitor national developments and provide further engagement or
reporting to the IJB as appropriate to support effective implementation and support
for local members. In particular, it might be the case that the Integration Scheme and
the IJB’s Standing Orders will both need updated to reflect the changes resulting
from the 2025 Order.  In respect of the Integration Scheme there are national
discussions underway, and officers will update further on this once the position is
clearer, noting that the 2025 Order takes effect in September 2026. 
5. Employee Implications
5.1. The Standards Commission for Scotland’s Advice Note for Members of Health and
Social Care Integration Joint Boards describes the role of the Standards Officer as
ensuring that appropriate training is provided to IJB members on the ethical
standards framework, the IJB’s Code of Conduct and associated guidance. The
Advice Note also highlights the importance of supporting members to understand
and manage conflicts of interest and to understand differing organisational cultures
across councils and NHS boards.
112

Page 113

5.2. Locally, the South Lanarkshire IJB has an adopted a Code of Conduct, based on the
Model Code of Conduct for Members of Devolved Public Bodies issued by Scottish
Ministers, with a revised version adopted in September 2024 following updates to the
Model Code. 
5.3. Any additional training or induction requirements arising from the changes to IJB
voting membership will be considered in line with updated national guidance and
existing local governance arrangements. 
6. Financial Implications
6.1. The Policy Note states that no Business and Regulatory Impact Assessment has
been prepared, on the basis that the instrument has no financial effects on the
Scottish Government, local government or on business. 
6.2. The Policy Note further states that the extension of voting rights does not change the
statutory accountability of the local authority or health board, nor change existing
financial effects associated with the operation of IJBs. 
7. Climate Change, Sustainability and Environmental Implications
7.1.  There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1 The Policy Note states that, to support implementation, the Scottish Government
intends to review and update the statutory guidance on IJB: roles, responsibilities
and membership to reflect the change to voting membership. 
8.2. The Policy Note accompanying the instrument records that issues raised during
engagement included:- 
 appointment and recruitment processes
 training, development and ongoing support requirements
 accessibility and practical support arrangements
 potential conflicts of interest
 the resource implications associated with supporting those members who will
have voting rights when they did not previously 
8.3. The Scottish Government have convened a working group to consider
implementation and the statutory guidance on IJB Roles, Responsibilities and
Membership. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. The statutory instrument was accompanied by an Equality Impact Assessment and
Children’s Rights and Wellbeing Impact Assessment documentation at national level. 
9.2. The Policy Note accompanying the instrument records the consultation process
undertaken by the Scottish Government in preparation of the instrument.  This
consultation took place between 24 November and 5 December 2025, building on
exploration of the issue of voting rights over the previous 4 years, as detailed in the
Policy Note. 
113

Page 114

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
29 April 2026 
Link(s) to Council Values/Priorities/Outcomes
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Fair, open and sustainable 
Previous References
 None 
Background Papers
 Public Bodies (Joint Working) (Integration Joint Boards) (Scotland) Amendment Order
2025 (SSI 2025/405)
https://www.legislation.gov.uk/ssi/2025/405/made
 Policy Note: The Public Bodies (Joint Working) (Integration Joint Boards) (Scotland)
Amendment Order 2025 (SSI 2025/405)
https://www.legislation.gov.uk/ssi/2025/405/pdfs/ssipn_20250405_en_001.pdf
 Integration Joint Board: Roles, Responsibilities and Membership: Statutory Guidance
https://www.gov.scot/publications/roles-responsibilities-membership-integration-joint-
board/pages/0/
 Standards Commission for Scotland’s Advice Note for members of Health and Social
Care Integration Joint Boards
https://www.standardscommissionscotland.org.uk/uploads/files/1743176335250328Ad
viceNoteforMembersofHealthandSocialCareIntegrationJointBoards2025v2.pdf 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Strachan, Head of Administration and Legal Services
Tel: 01698 454658
E-mail : Iain.Strachan@southlanarkshire.gov.uk 
114