Agenda Document Pack - Executive Committee - 01/04/2026

South Lanarkshire Council · 1 April 2026
Back to Executive Committee — 1 April 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 24 March 2026 
Dear Councillor 
Executive Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 01 April 2026
Time:  10:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Joe Fagan (Chair/ex officio), Gerry Convery (Depute Chair), Alex Allison, John Anderson, Robert
Brown, Andy Carmichael, Maureen Chalmers, Ross Clark, Margaret Cooper, Andrea Cowan,
Maureen Devlin, Gladys Ferguson-Miller, Elise Frame, Lynsey Hamilton, Susan Kerr, Ross Lambie,
Eileen Logan, Katy Loudon, Ian McAllan, Catherine McClymont, Lesley McDonald, Davie
McLachlan, Richard Nelson, Norman Rae, Mo Razzaq, Kirsten Robb, John Ross, David Shearer,
Margaret B Walker 
Substitutes
Walter Brogan, Poppy Corbett, Margaret Cowie, Celine Handibode, Graeme Horne, Martin Hose,
Cal Johnston-Dempsey, Hugh Macdonald, Kenny McCreary, Elaine McDougall, Mark McGeever,
Graham Scott, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Executive Committee held on 4 March 2026
submitted for approval as a correct record.  (Copy attached) 
3 - 12 
Monitoring Item(s) 
3 Revenue Budget Monitoring for Period 12 - 1 April 2025 to 20 February
2026 and Probable Outturn
Report dated 11 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
13 - 18 
4 Capital Budget 2025/2026 and Monitoring for Period 12 - 1 April 2025 to 20
February 2026
Report dated 11 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
19 - 24 
5 Update to Funding
Report dated 3 March 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
25 - 28 
Item(s) for Decision 
6 Pride in Place Programme – Hamilton Town Centre
Report dated 18 March 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
29 - 34 
7 Land and Property Transfers and Disposals
Report dated 25 February 2026 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
35 - 42 
Item(s) for Noting 
8 After School Provision in South Lanarkshire
Report dated 12 March 2026 by the Chief Executive.  (Copy attached) 
43 - 46 
Urgent Business 
9 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
2

Page 3

EXECUTIVE COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 4 March 2026 
Chair:
Councillor Joe Fagan (ex officio) 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Robert Brown, Councillor Andy
Carmichael, Councillor Maureen Chalmers, Councillor Ross Clark, Councillor Gerry Convery
(Depute), Councillor Andrea Cowan, Councillor Maureen Devlin, Councillor Gladys Ferguson-Miller,
Councillor Elise Frame, Councillor Lynsey Hamilton, Councillor Susan Kerr, Councillor Ross Lambie,
Councillor Eileen Logan, Councillor Katy Loudon, Councillor Ian McAllan, Councillor Catherine
McClymont, Councillor Lesley McDonald, Councillor Davie McLachlan, Councillor Richard Nelson,
Councillor Norman Rae, Councillor Mo Razzaq, Councillor John Ross, Councillor David Shearer,
Councillor Margaret B Walker 
Councillors' Apologies:
Councillor Margaret Cooper, Councillor Kirsten Robb 
Attending:
Chief Executive’s Service
P Manning, Chief Executive; J Kerr, Community Engagement Manager; T Little, Head of
Communications and Strategy
Community and Enterprise Resources
K Carr, Executive Director; A Brown, Head of Enterprise and Sustainable Development
Education Resources
L McRoberts, Executive Director
Finance and Corporate Resources
J Taylor, Executive Director; K McLeod, Administration Assistant; M Milne, Head of Personnel
Services; T Slater, Administration Adviser; I Strachan, Head of Administration and Legal Services
Housing and Technical Resources
C Jardine, Head of Property Services
Health and Social Care/Social Work Resources
S Sengupta, Director, Health and Social Care 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Executive Committee held on 4 February 2026 were submitted
for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.  
2
3

Page 4

3 Revenue Budget Monitoring for Period 11 - 1 April 2025 to 23 January 2026 and
Probable Outturn 
A report dated 10 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted on the overall financial position of the General Fund Revenue Account and the
Housing Revenue Account for the period 1 April 2025 to 23 January 2026 and the projection for
the year to 31 March 2026. 
The report and associated appendices:- 
 summarised the 2025/2026 Probable Outturn position for the Council’s General Fund
Revenue Account to 31 March 2026, following agreed transfers to reserves, which showed
a breakeven position
 detailed new redetermination monies, following receipt of the Local Government Finance
Settlement 2025/2026 on 30 January 2026
 provided details of the position on the General Fund Account and the Housing Revenue
Account respectively for the period 1 April 2025 to 23 January 2026
 proposed the re-allocation of £0.001 million of Local Action Fund monies for Ward 19
(Hamilton South) to Eddlewood Football Club
 provided the Housing Revenue Account position 
The Committee decided: 
(1) that the Council’s breakeven Probable Outturn position, after transfers to reserves, as
detailed in section 4 of the report, be noted; 
(2) that the current forecast on the General Fund Revenue Account for 2025/2026, as detailed
in section 5.1 of the report, and the actual spend as at 23 January 2026, as outlined in
section 5.4 and appendices 1 and 2 of the report, be noted; 
(3) that £0.001 million of Ward 19 (Hamilton South) Local Action Fund monies be re-allocated
to Eddlewood Football Club, as detailed in section 5.5 of the report; and 
(4) that the projected breakeven position on the Housing Revenue Account for 2025/2026, and
the actual spend as at 23 January 2026, as detailed in section 6 and Appendix 3 of the
report, be noted. 
[Reference: Minutes of 4 February 2026 (Paragraph 3)] 
4 Capital Budget 2025/2026 and Monitoring for Period 11 - 1 April 2025 to 23 January
2026 
A report dated 11 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted providing an update on the progress of the General Fund Capital Programme and
Housing Capital Programme for the period 1 April 2025 to 23 January 2026. 
The revised programme for the General Fund for 2025/2026, as summarised in Appendix 1 to the
report, was £67.712 million.  This included carry forward projects and previous adjustments
approved by this Committee.  The forecast for the financial year was £65.962 million and actual
spend incurred as at 23 January 2026 totalled £38.056 million.  Actual funding received up to 23
January 2026 was £46.967 million.  This was detailed in Appendix 2 to the report.  
4

Page 5

Information was provided on:- 
 a grant awarded to Education Resources of £0.098 million for the detailed design of a ‘state
of the art’ modern building for the development of the Gaelic language
 additional funding of £0.099 million from The Walk Wheel Cycle Trust (formerly SUSTRANS)
for resurfacing along the existing NCN 74 Abington to Crawford Quietway which would be
added to the 2026/2027 Capital Programme 
The revised Housing Capital Programme for 2025/2026 amounted to £87.740 million.  Programme
funding for the year also totalled £87.740 million.  The funding sources were detailed in Appendix
3 to the report.  Budget for the period amounted to £56.180 million and, as at 23 January 2026,
£56.180 million had been spent. 
An update was provided on the profile spend on the New Build Programme, which had been
impacted by delays in securing grant funding and overcoming technical design issues.  This had
been offset by an increase in the target number of buy-backs.   Any funding not used in
2025/2026 would be carried forward into 2026/2027 to allow completion of the projects. 
£1.7 million of funding had also been confirmed to allow the Council to carry out Single Building
Assessments for 28 medium and high-rise buildings.  Due to the timing of the award, this would
be carried forward to the 2026/2027 Housing Revenue Account Capital Programme. 
The position on the General Fund Capital Programme and the Housing Capital Programme would
be monitored by the Financial Resources Scrutiny Forum. 
The Committee decided: 
(1) that the position of the General Fund Capital Programme, as detailed in appendices 1 and
2 of the report, and the Housing Capital Programme, as detailed in Appendix 3 of the report,
as at 23 January 2026, be noted; and 
(2) that the revised programmes be monitored by the Financial Resources Scrutiny Forum. 
[Reference: Minutes of 4 February 2026 (Paragraph 4)] 
5 Update to Funding 
A report dated 5 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted on additional funding, totalling £15.016 million, which had been made available to
the Council by the Scottish Government and other external sources. 
The funding had been allocated as follows:- 
Revenue Funding 
Resource 2025/2026 2026/2027 
(£m) (£m) 
Finance and Corporate 7.091 
Education 1.263 
Community and Enterprise 0.142 4.671 
Total 8.496 4.671  
5

Page 6

Capital Funding 
Resource 2025/2026 
(£m) 
Housing and Technical  1.652 
Education 0.098 
Community and Enterprise 0.099 
Total 1.849 
Overall Total 15.016 
The Executive Director (Finance and Corporate Resources) responded to members’ questions in
relation to various aspects of the report and undertook to provide a member with information on
the allocation and approval process for No One Left Behind (NOLB) – Employability funding for
2026/2027. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 4 February 2026 (Paragraph 5)] 
6 Bank Holiday – FIFA 2026 World Cup 
A report dated 9 February 2026 by the Executive Director (Finance and Corporate Resources)
was submitted advising of the arrangements to enable employees to celebrate Scotland’s first
game in the 2026 FIFA World Cup. 
To mark Scotland’s opening game against Haiti on Sunday 14 June 2026, an additional national
bank holiday had been announced by Royal Proclamation, following a request by the Scottish
Government, for Monday 15 June 2026.  However, it was for individual local authorities to decide
on the provision of the additional bank holiday. 
The bank holiday would enable employees to celebrate the event, which would have a kick-off
time of 2:00 am.  Non-essential services provided by the Council would be reduced and Council
offices closed, where possible. 
Details were given on services which would be provided by the Council on 15 June 2026. 
Employees required to work on the additional fixed annual leave day would receive a day’s leave
which they could take at an alternative time. 
There followed a debate on the potential positive and negative implications of the proposals. 
Councillor Nelson advised that, although he would not formally move against the
recommendations, without funding from the Scottish Government and given the Council Tax rise
that the Council had recently approved, the Conservative Group could not support the proposals,
and he requested that this position to be noted. 
The Committee decided: that the granting of an additional fixed annual leave day for
employees on Monday 15 June 2026 be approved. 
7 South Lanarkshire Leisure and Culture – Activage Proposals for 2026/2027 to
2028/2029 
A report dated 9 February 2026 by the Executive Director (Community and Enterprise Resources)
was submitted proposing an increase to the 2026/2027 concession rate for South Lanarkshire
Leisure and Culture’s (SLLC’s) Activage membership. 
6

Page 7

Similar to local authorities, SLLC was facing increased pressure on its budgets and had a legal
duty to set a balanced budget.  While SLLC had full autonomy to review and set the pricing of all
commercial activities, the Council had retained the authority to decide on concession pricing,
which included the Activage membership. 
Information was provided on:- 
 the range of leisure facilities provided through Activage to South Lanarkshire residents aged
60 years and over, as detailed in Appendix 1 to the report
 the results of a benchmarking exercise undertaken with similar and neighbouring authorities,
as detailed in Appendix 2 to the report
 the results of consultation and engagement undertaken with residents and Activage
members, provided in appendices 3 and 4 to the report 
The SLLC Board, at its meeting on 13 November 2025, agreed to request approval from the
Council to increase the price of the annual Activate membership from £120 to £150, with this price
to be held for 3 years.  This would reduce SLLC’s estimated funding gap of £3.518 million by
£0.243 million. 
The Committee decided: 
(1) that the price of South Lanarkshire Leisure and Culture’s annual Activage membership be
increased from £120 to £150; and 
(2) that the price be held at £150 for 3 years. 
[Reference: Minutes of 23 June 2021 (Paragraph 11) and 21 February 2024 (Paragraph 9)] 
8 Marmot Place Programme – Data Update 
A report dated 12 February 2026 by the Chief Executive was submitted providing an update on
the progress made by the Marmot Place Programme Data Group. 
Information was provided on the:- 
 background to the Marmot Place Programme where South Lanarkshire was 1 of 3 Scottish
areas participating in the Collaboration for Health Equity in Scotland (CHES) pilot
 3 phases of the CHES pilot, with Phase 1 focusing on data and evidence analysis
 work of the multi-agency group established to collate, analyse and present local and national
data to support local prioritisation and action
 decision to prioritise child poverty and family support in early years
 findings of the data analysis under the following headlines, which showed that people living
in more deprived circumstances generally had poorer outcomes:-
 give every child the best start in life
 enable all children, young people and adults to maximise their capabilities and have
control over their lives
 create fair employment and good work for all
 ensure a health standard of living for all
 create and develop healthy and sustainable places and communities
 strengthen the role and impact of ill health prevention
 tackle racism, discrimination and their outcomes
 pursue environmental sustainability and health equity together  
7

Page 8

Infographics were provided at appendices 1 and 2 to the report which showed child poverty data
and life expectancy data at intermediate zone level at various junctions along the M74 within South
Lanarkshire.  If approved by Committee, the infographics would be used publicly to illustrate gaps
in outcomes experienced between local communities. 
Officers responded to members’ questions in relation to various aspects of the report. 
The Chair thanked all Council officers and partners who had been part of the Marmot pilot. 
The Committee decided: 
(1) that the progress of the South Lanarkshire Marmot Data Group, and the work completed to
date in developing the local evidence base, be noted; 
(2) that the headline findings from the analysis to date, including that there was an overall
pattern which demonstrated how people living in more deprived circumstances generally
had poorer outcomes, be noted; and 
(3) that the infographics, attached as appendices 1 and 2 to the report, be approved for wider
publication, to illustrate the gaps in outcomes experienced between local communities. 
[Reference: Minutes of 25 June 2025 (Paragraph 15)] 
9 Marmot Place Programme - Operational Update 
A report dated 12 February 2026 by the Chief Executive was submitted on the progress made on
the Marmot Place Programme and proposing participation in an Early Years Transformation Pilot. 
Information was provided on:- 
 the development of the South Lanarkshire Marmot Framework which would be applied to
pilot projects
 a range of actions proposed by the Leadership Group following consideration of the results
of the data phase and the principles of the Marmot Framework under the following 3
workstreams, progress of which was outlined in the report:-
 data and intelligence
 strategic alignment
 action
 the Early Years Transformation Pilot Model, based on the Sure Start approach which:-
 was based on focusing investment in neighbourhoods with the highest rate of child
poverty
 enabled access to family support services for all families within a geographical area
 integrated services to give children a strong start in life and reduce a fragmented
service experience
 the establishment of a multi-agency steering group which would:-
 consider the development of an early years family support approach
 consider current models of early intervention and family support currently operated
through the successful South Lanarkshire Family Support Hub model
 work with the Collaboration for Health Equity in Scotland (CHES)
 the next steps to develop and progress the programme, as outlined in section 6 of the report
 the funding allocated by the Council to support the Marmot Place Programme 
Officers responded to a member’s questions in relation to aligning with the wider community.  
8

Page 9

The Committee decided: 
(1) that the contents of the report and work undertaken to date be noted; 
(2) that the proposals for the Council to participate in an Early Years Transformation Pilot with
partners, through the Community Planning Partnership, be approved; and 
(3) that the next steps, as outlined in section 6 of the report, in terms of developing and
progressing the programme, be noted. 
[Reference: Minutes of 4 February 2026 (Paragraph 3)] 
10 Review of the Council Plan 
A report dated 11 February 2026 by the Chief Executive was submitted providing an update on
the review of the Council Plan, Connect. 
Connect 2022 to 2027 had been approved on 15 June 2022 and set out the Council’s key actions
to be delivered over its 5-year term.  A mid-term review had been conducted in 2024 which
sharpened the focus of the Plan’s priorities and updated the content to reflect the changing context
for the Council’s activities. 
With the Plan approaching the end of its 5-year term, work would begin to prepare a new Council
Plan for the period 2027 to 2032, which would be submitted to the new Council following the local
government elections scheduled to take place on 6 May 2027. 
Information was provided on:- 
 the review process, which would include extensive engagement and consultation, together
with horizon-scanning and data profiling exercises
 the timescales for the review and development of the new Plan
 the other strategic documents that would be prepared for submission to the new Council 
Following a request by a member, the Head of Communications and Strategy agreed to ask
relevant officers to consider the inclusion of a strategic plan in relation to increasing the rural
population. 
The Committee decided: 
(1) that the process for developing the new Council Plan, as outlined in section 5 of the report,
be noted; 
(2) that the indicative timetable and key stages, as outlined in section 6 of the report, be noted;
and 
(3) that the list of other strategic documents being prepared for presentation to the new Council,
as outlined in section 8 of the report, be noted. 
[Reference: Minutes of 30 April 2025 (Paragraph 7)] 
9

Page 10

11 Scottish Government National Review (Group-based Child Sexual Abuse and
Exploitation): Local Engagement Arrangements 
A report dated 12 February 2026 by the Director, Health and Social Care was submitted advising
of the commencement of the Scottish Government National Review of Group-based Child Sexual
Abuse and Exploitation. 
The Review, which formally commenced on 9 February 2026, was being jointly conducted by the
Care Inspectorate, His Majesty’s Inspectorate of Constabulary in Scotland (HMICS), Healthcare
Improvement Scotland (HIS) and His Majesty’s Inspectorate of Education in Scotland (HMIE)
under Section 115 of the Public Services Reform (Scotland) Act 2010 and the Public Services
Reform (Joint Inspections) (Scotland) Regulations 2011. 
The purpose of the Review was to strengthen the national evidence base on the scale and nature
of group-based child sexual abuse and exploitation and group-based child criminal exploitation,
and to assess how effectively public protection partners worked together to prevent, identify and
respond to this kind of harm. 
Information was provided on how the Council, as a statutory partner within local child protection
and public protection arrangements, would support the Review through the South Lanarkshire
Chief Officers’ Group. 
The findings would inform Scottish Ministers’ consideration of whether further national action,
including a potential public inquiry, was required. 
The Committee decided: that the content of the report be noted. 
12 Urgent Business 
There were no items of urgent business. 
13 Exclusion of Press and Public 
The Committee decided: that, in terms of Section 50A(4) of the Local Government
(Scotland) Act 1973, the press and public be excluded from
the meeting for the following item(s) of business on the
grounds that it was likely that there would be disclosure of
exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act. 
14 Former Bairds Building, Hamilton 
A report dated 12 February 2026 by the Executive Director (Community and Enterprise
Resources) was submitted seeking approval to exercise the Council’s pre-emption clause in
relation to the former Bairds building in Hamilton to bring forward its demolition and redevelopment
as an early action within the Hamilton Town Centre Masterplan. 
Information was provided on:- 
 the background to the sale of the building, which included a pre-emption clause to allow the
Council to buy back the building at the same price and on the same terms and conditions if
the new owner decided to sell  
10

Page 11

 the identification of the building as a key site to achieve the vision for the Hamilton Town
Centre Masterplan
 the receipt of Pride in Place funding that would contribute towards the Hamilton Town Centre
Masterplan
 the rationale for exercising the pre-emption clause 
The Head of Enterprise and Sustainable Development responded to members’ questions in
relation to various aspects of the report. 
The Committee decided: 
(1) that officers be authorised to exercise the pre-emption clause available to it to purchase the
former Bairds building from J D Wetherspoon PLC; 
(2) that proposals to progress the demolition and site preparation for future redevelopment of
the site be approved; 
(3) that the intention to continue to work with the owners of the Regent Centre to bring forward
complementary development proposals be noted; and 
(4) that the Executive Director (Community and Enterprise Resources), in consultation with the
Head of Administration and Legal Services, be authorised to enter into such documentation
to finalise the exercise of the said pre-emption clause in the best interests of the Council. 
[Reference: Minutes of 13 February 2019 (Paragraph 11), 21 February 2024 (Paragraph 6) and
8 May 2024 (Paragraph 15)] 
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Revenue Budget Monitoring for Period 12 - 1 April 2025
to 20 February 2026 and Probable Outturn 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the forecast for the year to 31 March 2026 for the Council’s
General Fund Revenue Account and Housing Revenue Account, and the actual
spend position for the period 1 April 2025 to 20 February 2026
[1purpose]
2. Recommendation(s)
2.1. The Executive Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s breakeven Probable Outturn position after transfers to
reserves (section 4), be noted;
(2) that the current forecast on the General Fund Revenue Account for 2025/2026
(section 5.1), and the actual spend as at 20 February 2026 (section 5.4 and
appendices 1 and 2), be noted; and
(3) that the projected breakeven position on the Housing Revenue Account for
2025/2026, and the actual spend as at 20 February 2026 (section 6 and
Appendix 3 of the report), be noted. 
3. Background
3.1. This overview report will summarise the previously reported 2025/2026 Probable
Outturn position for the Council’s General Revenue Account to 31 March 2026.  An
Executive Summary is provided in section 4 outlining the detail of the General Fund
outturn position including details of proposed transfers to Reserves.  An update on
the projected Outturn for 2025/2026 for both the Council’s General Fund (section 5)
and for the Housing Revenue Account (section 6) is also provided. 
4. Executive Summary – 2025/2026 General Services Probable Outturn
4.1. As reported previously, the 2025/2026 probable outturn position for the General
Fund presented an underspend of £3.579 million.  This underspend is after the
previously identified / approved Transfers to Reserves (£38.108 million) and the
proposed Transfers to Reserves (£16.339 million) that were subsequently approved
by the Executive Committee in February 2026. 
4.2. In terms of the £3.579 million, the following was agreed by Committee (Executive, 4
February 2026):-
 that £1.000 million be transferred to reserves to support the Marmot initiative
 that £0.040 million be set aside to support the continuation of the Winter Wishes
programme  
3
13

Page 14

 that £0.100 million be transferred to reserves for Commercial Feasibility costs
 that £0.400 million be set aside to augment the external medium grants
allocation available for the next two years beyond 2026/2027
 that £0.300 million be allocated to Heat Network / Decarbonisation projects
 that the remaining £1.739 million underspend be transferred to reserves for
budget considerations in future years 
5. 2025/2026 General Services Probable Outturn – Resources and Corporate Lines
5.1. Total Resource Position:  The forecast position before and after transfers to
reserves is shown in appendices 1 and 2.  The position presented in Appendix 2
reflects the previously reported probable outturn underspend of £3.579 million as a
transfer to reserves (section 4.2). This is in line with the Probable Outturn reported to
Executive Committee on 4 February 2026. 
5.2. Financial monitoring against the reported Probable Outturn position continues across
all Resources as we approach the financial year end.  Any movement from the
Probable Outturn position will be reported as part of the year end position.  This may
include further proposed transfers to reserves if any committed monies have not
been spent in year. 
5.3. Local Government Finance Order:  Following the draft Local Government
Settlement in January, the Scottish Government has now issued the Local
Government Finance Order on 26 February 2026.  This is the final notification of
funding following the budget process at Scottish Government.  As well as advising of
the 2026/2027 Local Government Settlement, the document also provided formal
confirmation of a number of Revenue grant redeterminations for financial year
2025/2026.  There were no changes to either the 2026/2027 Settlement or
2025/2026 redeterminations from the indicative figures previously provided and
reported to Committee and Council. 
5.4. Clydeplan: The Joint Committee of the Glasgow and the Clyde Valley Strategic
Development Planning Authority, known as Clydeplan, was formally terminated on
31 March 2025.  The Council are due to receive a share of the reserves that have
been accumulated (£0.032 million).  It will be proposed at year end to utilise this
funding for IT development upgrades to planning and building standards
performance systems, once all agreements have been reached with member
authorities. 
6. Housing Revenue Account Position
6.1. Appendix 3 also shows the forecast position for the financial year.  The Appendix
shows a breakeven position for the Housing Revenue Account. 
6.2. This breakeven position includes a higher than budgeted transfer from reserves
(£0.287 million greater than budgeted).  The detail is shown in Appendix 3 with
variance explanations across subjective categories and includes spend on the new
Housing Management system introduced this year. 
7. Employee Implications
7.1. None. 
8. Financial Implications
8.1. As detailed in sections 4 to 6 of the report.  
14

Page 15

9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
10. Other Implications
10.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  The risk has been assessed as low given the detailed budget
management applied across the Resources.  The risk is managed through four
weekly Budget Monitoring Meetings at which any variance is analysed. In addition,
this probable outturn exercise ensures early warning for corrective action to be taken
where appropriate. 
10.2. There are no implications for sustainability in terms of the information contained in
this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
11.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
11 March 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 20 February 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o'hagan@southlanarkshire.gov.uk
15

Page 16

Note:  While the Year to Date Actual at period 12 presents a net surplus position (£81.052m), this is timing only.  The forecast outturn
before transfers to reserves shows an underspend of £19.918 million.
16

Page 17

Note:  While the Year to Date Actual at period 12 presents a net surplus position (£81.052m), this is timing only. The forecast outturn after
transfers to reserves shows a breakeven position.
Appendix 2
After Transfers to Reserves
Revised Projected Projected % Note Year to Date
Annual Outturn Outturn Actual
Budget Variance
Resources: £m £m £m £m
Community and Enterprise Resources 131.066 130.718 0.348 0.27% 106.667
Facilities Waste and Grounds 79.332 79.010 0.322 0.41% 63.095
Leisure and Culture 20.090 20.126 (0.036) (0.18%) 19.099
Planning and Regulatory Services 5.235 4.397 0.838 16.01% 3.221
Enterprise and Sustainable Development 6.658 7.414 (0.756) (11.35%) 7.411
Roads, Transportation and Fleet 19.751 19.771 (0.020) (0.10%) 13.841
Education Resources 502.289 502.289 0.000 0.00% 451.717
Education 502.289 502.289 0.000 0.00% 451.717
Finance and Corporate Resources 44.456 43.878 0.578 1.30% 45.040
Finance Services - Strategy 2.311 2.343 (0.032) (1.38%) 3.471
Finance Services - Transactions 18.955 18.401 0.554 2.92% 15.131
Audit and Compliance Services 0.363 0.345 0.018 4.96% 0.430
Information Technology Services 8.512 8.614 (0.102) (1.20%) 11.328
Communications and Strategy Services 2.530 2.296 0.234 9.25% 2.402
Administration and Licensing Services 4.985 4.964 0.021 0.42% 5.299
Personnel Services 6.800 6.915 (0.115) (1.69%) 6.979
Housing & Technical Resources 18.941 18.941 0.000 0.00% 18.747
Housing Services 8.289 8.229 0.060 0.72% 8.382
Property Services 10.652 10.712 (0.060) (0.56%) 10.365
Social Work Resources 251.967 251.967 0.000 0.00% 214.019
Performance and Support Services 6.187 5.899 0.288 4.65% 4.595
Children and Families 52.740 53.730 (0.990) (1.88%) 43.305
Adults and Older People 192.159 192.159 0.000 0.00% 165.830
Justice and Substance Misuse 0.881 0.179 0.702 79.68% 0.289
Joint Boards 1.629 1.629 0.000 0.00% 1.504
950.348 949.422 0.926 0.10% 837.694
Revised Projected Projected Year to Date
Annual Outturn Outturn Actual
Budget Variance
Summary: £m £m £m £m
Resources Total 950.348 949.422 0.926 0.10% 837.694
CFCR 2.279 2.279 0.000 0.00% 0.000
Loan Charges 37.249 35.148 2.101 5.64% 0.000
Corporate Items (3.824) (4.246) 0.422 (11.04%) 0.267
Loans Fund Review - T/f to Reserves 13.349 13.349 0.000 0.00% 0.000
Teacher Numbers - T/f to Reserves 4.200 4.200 0.000 0.00% 0.000
2025/2026 Investments - T/f to Reserves 13.859 13.859 0.000 0.00% 0.000
Waste and Recycling Services - T/f to Reserves 2.200 2.200 0.000 0.00% 0.000
Budget Strategy - T/f to Reserves 4.500 4.500 0.000 0.00% 0.000
Outturn Underspend - T/f to Reserves 0.000 3.579 (3.579) 0.00% 0.000
Total Expenditure 1,024.160 1,024.290 (0.130) (0.01%) 837.961
Council Tax 196.599 196.729 0.130 0.07% 181.781
Less: Council Tax Reduction Scheme (24.776) (24.776) 0.000 0.00% (22.870)
171.823 171.953 0.130 0.08% 158.911
General Revenue Grant 452.334 452.334 0.000 0.00% 417.539
Non Domestic Rates 371.110 371.110 0.000 0.00% 342.563
Transfer from Reserves 28.893 28.893 0.000 0.00% 0.000
Total Income 1,024.160 1,024.290 0.130 0.01% 919.013
Net Expenditure 0.000 0.000 0.000 0.00% (81.052)
SOUTH LANARKSHIRE COUNCIL
Revenue Budget Monitoring Report
Period Ended 20 February 2026 (No.12)
17

Page 18

Variance Explanations
1. Employee Costs
The underspend in employee costs is due to vacancies within the service that continue to be actively recruited. 
2. Property Costs
The forecast underspend is due to the net effect of underspends in void rent loss and ground maintenance charges partially offset by
greater than budgeted contract cleaning. 
3. Supplies & Services
The forecast overspend is mainly due to spend on IT equipment costs this financial year. 
4. Administration Costs
The forecast underspend is mainly due to lower than anticipated telephone and postage costs in the financial year. 
5. Payment to Other Bodies
Payments to Other Bodies are overspent due to spend on IT systems this financial year. 
6. Income
Income is under recovered mainly due to lower than budgeted income from laundry. 
18

Page 19

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Capital Budget 2025/2026 and Monitoring for Period 12
- 1 April 2025 to 20 February 2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Executive Committee of progress on the General Fund Capital
Programme and the Housing Capital Programme for the period 1 April 2025 to
20 February 2026 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[r
(1) that the position of the General Fund Capital Programme (appendices 1 to 2)
and the Housing Capital Programme (Appendix 3), as at 20 February 2026, be
noted; and
(2) that the revised programmes be monitored by the Financial Resources Scrutiny
Forum. 
3. Background
3.1. The attached statements to this report provide a summarised monitoring position as
at 20 February 2026 (period 12).  Spending has been split into two separate sections
below: 
 General Fund Capital Programme inc. Education, Social Work, Roads and
General Services (Section 4)
 Housing Capital Programme (Section 5) 
4. General Fund Capital Programme
4.1. 2025/2026 Budget: The revised programme for the General Fund is £67.712 million
(summarised in Appendix 1).  This revised programme consists of the base budget
plus carry forward projects and adjustments which have been agreed by the Executive
Committee up to and including its meeting on 3 December 2025.  There were no
adjustments to the programme presented to the Executive Committee on 4 February
2026 and 4 March 2026. 
4.2. The overall funding available of £67.712 million to support the programme is detailed
in Appendix 2.  
4
19

Page 20

4.3. 2025/2026 Forecast:  As noted in 4.1, the total capital spending programme for the
year is £67.712 million.  The forecast spend for the current year is currently £65.962
million, an anticipated net underspend of £1.750 million. 
4.4. As reported previously, the anticipated underspend in 2025/2026 is due to 2 projects,
being East Kilbride Town Centre (£0.800 million) where the demolition costs are lower
than anticipated, and Hamilton Junctions (£0.950 million) as works planned for
Wellhall Road have been reprogrammed to begin in spring 2026. 
4.5. Work continues to maximise spend for the remainder of the financial year, and any
variance to the spend projected above will be highlighted in the year-end report to
Committee. 
4.6. 2025/2026 Actual Position:  Actual spend incurred to the 20 February 2026 totals
£42.034 million. 
4.7. Actual funding received to 20 February 2026 is £43.620 million.  This is shown in
Appendix 2.  Relevant officers will continue to closely monitor the generation of all
income including receipts. 
5. Housing Programme
5.1. 2025/2026 Budget:  Appendix 3 summarises the position on the Housing programme
as at 20 February 2026.  The total Housing Capital programme for the year is £87.740
million. 
5.2. 2025/2026 Forecast:  As noted in 5.1, the total capital spending programme for the
year is £87.740 million.  As reported last period, current estimates from the Resource
have identified an outturn of £85.940 million for the year, an underspend of £1.8 million
against the budget of £87.740 million. 
5.3. Any funding not used in 2025/2026 in relation to the new build programme will be
carried forward into 2026/2027 to allow completion of the projects. 
5.4. 2025/2026 Actual Position:  Spend to 20 February 2026 on the Housing Capital
Programme amounts to £63.563 million. 
5.5. As at 20 February 2026, £63.563 million of funding had been received. 
5.6. Regular monitoring of both the General Fund Programme and the Housing
Programme will be carried out in detail by the Financial Resources Scrutiny Forum
and reported on a regular basis to the Executive Committee. 
6. Employee Implications
6.1. None. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.  
20

Page 21

8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is an overspend.  The
risk has been assessed as low given the detailed project management plans prepared
and monitored for each project.  The risk of overspend is managed through four weekly
Investment management meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and, therefore, no impact assessment
is required. 
9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
11 March 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 South Lanarkshire Council, 26 February 2025
 Executive Committee, 3 December 2025
 Executive Committee, 4 February 2026
 Executive Committee, 4 March 2026 
List of Background Papers
 Capital Ledger prints to 20 February 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  2601(Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk 
21

Page 22

APPENDIX 1
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
£m  
Total Base Budget (including carry forward from 2024/2025)  67.712 
Proposed Adjustments – Period 12 -  
Total Revised Budget  67.712   
2025/26 
Budget 
Period 12
Proposed
Adjustments
Revised 
2025/26 
Budget 
Resource  £m £m £m
Community & Enterprise 55.160 - 55.160
Education 5.006 - 5.006
Finance & Corporate 0.645 - 0.645
Housing & Technical 6.564 - 6.564
Social Work 0.337 - 0.337
TOTAL CAPITAL PROGRAMME 67.712 - 67.712 
22

Page 23

APPENDIX 2 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26      
GENERAL FUND PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
2025/26
Original
Estimate
inc C/F 
2025/26
Revised
Budget 
2025/26
Forecast 
Spend 
2025/26
Forecast
Variance 
2025/26
Actual to
20/02/26      
Expenditure £m £m £m £m £m      
General Fund Programme 64.188 67.712 65.962 1.750 42.034 
Income
2025/26
Budget
2025/26
Revised
Budget  
2025/26
Actual
To
20/02/26         
£m         £m   £m
Prudential Borrowing 17.192 17.425   0.000
Developers Contributions 1.965 4.679   4.319
Partners  0.450 3.682   1.172
Scottish Government:     
- Capital Grant 27.467 28.352   28.352 
- Vacant & Derelict Land 1.477 1.502   1.390 
- Place Based Investment  0.589 0.589   1.552
Levelling Up Fund 7.700 7.200   6.135
Capital Receipts 0.700 0.700   0.700
Specific Reserves 0.038 1.284   0.000
Revenue Contribution 6.610 2.299   0.000      
TOTAL FUNDING 64.188 67.712   43.620  
23

Page 24

APPENDIX 3 
SOUTH LANARKSHIRE COUNCIL       
CAPITAL EXPENDITURE 2025/26       
HOUSING PROGRAMME 
FOR PERIOD 1 APRIL 2025 TO 20 FEBRUARY 2026 
2025/26
Annual 
Budget  
2025/26
Forecast
Spend
2025/26
Forecast
Variance
2025/26
Actual to
20/02/26 
£m £m £m £m
Expenditure 
2025/26 Budget  87.740  85.940  1.800  63.563     
2025/26
Annual 
Budget  
2025/26
Actual to
23/01/26 
£m   £m
Income 
Capital Receipts  -    0.032
Capital Funded from Current Revenue 35.633   26.672
Prudential Borrowing 19.409   21.429
Scottish Government Specific Grant:    
- Capital Grant 1.652   0.000
- New Build 24.726   12.513
- Open Market Purchase Scheme 6.000   2.651
- Mortgage to Rent 0.120   0.060
Climate Emergency Fund 0.200   0.000
Other Income 0.000   0.206 
87.740   63.563 
24

Page 25

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Update to Funding 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Members of additional funding that has been made available to the
Council by the Scottish Government and other external sources since the last
report to this Committee (4 March 2026)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the additional funding totalling £0.150 million, detailed in Appendix 1, be
noted. 
3. Background
3.1. In year funding can change, and this can be in relation to funding for specific purposes
or funding expected and already included in our budget planning. 
3.2. Additional funding may either be paid through the General Revenue/Capital Grant
mechanism or by the completion of appropriate grant claims. 
3.3. Details of the additional funding is attached in Appendix 1 of the report. The report
details additional funding that has been reported by Resources as part of the additional
resources’ notification process, as well as any additional funding that has increased
the Council’s budget by more than £0.100 million. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. Additional Revenue funding of £0.150 million has been identified for 2025/2026. This
is detailed in Appendix 1. 
5.2. Resource budgets will be updated to reflect this additional funding.  Where
appropriate, details of spending plans will be presented to Resource Committees for
approval. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report.  
5
25

Page 26

7. Other Implications
7.1. There are no other implications in terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
3 March 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None. 
List of Background Papers
 Additional Funding Grant Awards. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Lorraine O’Hagan, Head of Finance (Strategy)
Ext:  5637 (Tel:  01698 455637)
E-mail: lorraine.o’hagan@southlanarkshire.gov.uk
26

Page 27

Appendix 1 
Additional Revenue Funding 
Resource  Description  2025/2026
£m 
2026/2027
£m 
Total
£m 
Method
Community
and
Enterprise
Pride in Place Programme
This grant funding is to be used to
build local capacity and capability for
the delivery of the Pride in Place
Programme, including the
establishment of a Board and the
facilitation of early community
engagement. Due to the timing of the
award, expenditure will be incurred in
2026/2027 with funding carried forward
as a transfer to reserves at year end. 
0.150 - 0.150 United
Kingdom
Government 
TOTAL REVENUE FUNDING 0.150 - 0.150 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Pride in Place Programme – Hamilton Town Centre 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Pride in Place Programme in respect of the appointment
of the Independent Chair and Neighbourhood Board 
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendations:- 
(1) that the appointment of the Independent Chair for the Pride in Place
Programme for Hamilton Town Centre – An Anchor for the Hamilton Area be
noted;
(2) that the process for the recruitment of the Hamilton Town Centre
Neighbourhood Board, as set out in section 5, be approved; and
(3) the timeline and next steps as set out in section 6 be noted. 
3.  Background
3.1. In September 2025, the UK Government confirmed that 12 local authorities would
benefit from Phase 2 of the Pride in Place Programme, including South Lanarkshire
Council.  The programme aims to support the most in-need neighbourhoods across
the UK by awarding up to £20m over 10 years for each neighbourhood.  The
Programme relies on local people and partnerships, bringing together residents the
local MP, the Council, businesses and community organisations to produce a clear
vision for their area. 
3.2. Selected neighbourhoods will decide how to prioritise funding, based on extensive
community engagement, across three core objectives: 
 To build stronger communities;
 To create thriving places; and
 To empower people to take back control.  
6
29

Page 30

3.3. In October 2025, the Council received a letter from the Secretary of State for Scotland,
inviting applications to the Programme from the four eligible UK Parliamentary
constituencies within South Lanarkshire based on the highest deprivation levels and
the weakest social infrastructure (using Scottish Indices of Multiple Deprivation and
the Community Needs Index).  Constituencies identified by the UK Government as
being ‘in scope’ contained one or more ‘high-need Intermediate Zones’. 
3.4. In consultation with group leaders six applications were submitted to the UK
Government in November 2025 and on 12 December 2025, the Council was notified
that the Hamilton Town Centre – An Anchor for the Hamilton Area was identified as
the neighbourhood within the South Lanarkshire Council area to receive funding from
the Pride in Place Programme. 
4. Appointment of an Independent Chair 
4.1. The Executive Committee on 3 February 2026, approved the process for the
recruitment of an Independent Chair of the Hamilton Town Centre Neighbourhood
Board and delegated the appointment of the Chair to the Chief Executive in
consultation with the Leader of the Council, Hamilton North and East Ward members
and Imogen Walker MP.    
4.2. As previously outlined to the Executive Committee, the recruitment process
commenced at the end of January with six expressions of interest being received by
the Chief Executive at the closing date of 15 February 2026.  A shortleeting process
was then undertaken and three applicants were invited to interview with the Chief
Executive, Leader of the Council and Imogen Walker MP on 13 March 2026.  Following
interview and in consultation with Hamilton North and East Ward members, Ronnie
Smith was appointed as the Chair of the Hamilton Town Centre Neighbourhood Board. 
The appointment has been notified to the UK Government ahead of the 31 March 2026
deadline. 
4.3.  Mr Smith brings a wealth of experience and partnership working having been Head of
Economic Development in East Kilbride District Council,  worked with Hamilton
Enterprise Development Company, founding member and Director of Lanarkshire
Civic Pride Campaign, Director and Chief Executive of Lanarkshire Enterprise
Services, Chair of the Lanarkshire College/ New College Lanarkshire and Chair of the
Board of North Lanarkshire Council's ALEO, Fusion Assets. 
4.4. In accordance with UK Government Guidance, the Chair is required to lead on the
recruitment of the Neighbourhood Board. 
5. Appointment of the Neighbourhood Board 
5.1. The Chair will lead the recruitment for members of the Neighbourhood Board, ensuring
an inclusive and representative selection of people from across the community. The
Chair will be supported by the Council and local MP to identify and recruit candidates
for the Board.
5.2. The Chair is to be guided by the following criteria in convening and agreeing the Board,
working with the MP and the Council: 
 boards must have at least eight members, to ensure a broad range of voices and
perspectives
 the majority (at least 51%) of members should live or work within the boundaries
of the neighbourhood, ensuring that the Board is resident-led  
30

Page 31

 members should broadly reflect the range and diversity of people who live in the
area – for example, in relation to age, ethnicity, gender, faith, disability or income
levels 
5.3. The Neighbourhood Board must include the following members:-
 the local MP
 MSP
 at least one ward Councillor 
 other representatives including:-
 community leaders such as community groups, faith groups and youth
groups
 local businesses and social enterprises such as Business Improvement
District representatives, Chamber of Commerce, and key
employers/investors
 cultural, arts, heritage and sporting organisations such as local sports clubs
and heritage groups
 public agencies and anchor institutions such as local schools, higher and
further education establishment, community planning partnerships, GPs. a
senior local authority officers such as Director of Economic Development is
also eligible to sit on the Board to ensure co-ordination with wider plans 
5.4. In respect of governance of the Board, it is expected that the Board will meet at least
quarterly and it will publish:-
 a documented decision-making process, outlining the voting rights of the Board
 profiles of Board members
 all Board papers in advance of the meeting within 5 working days
 draft minutes of meetings following the meeting within 10 working days
 final minutes, once approved by the Board within 10 working days
 any conflicts of interest reported, within the published minutes
 full use of capacity funding, including amount of remuneration and/or expenses
reimbursed, if applicable 
5.5. As set out in the UK Government Guidance, the appointment of the neighbourhood
board is to be led by the Chair, appointed and approved by the Council and the MP. 
As such, it is intended that a further paper will be brought back to Executive Committee
to approve the Hamilton Town Centre Neighbourhood Board on 24 June 2026.  The
Board must be established and notified to the UK Government by 17 July. 
5.6. At the request of the Chair, adverts and public notices have now been published online
and in the local newspaper seeking expressions of interest for membership of the
Neighbourhood Board. The closing date for expressions of interest has been set for
17 April 2026. Thereafter, shortleeting and interviews will be held by the Chair, MP
and Chief Executive of the Council.
5.7. The Neighbourhood Board is required to develop a Pride in Place Plan outlining their
vision for change over the next decade and how they will use their funding to achieve
their goals.  The Board is required to detail how funding will be spent in the first 4-year
investment cycle.  This Plan is required to be formally submitted to the UK Government
for approval by 28 November 2026 with approval anticipated in spring 2027.  It is
anticipated that the Hamilton Town Centre Masterplan will form the basis of this Plan.  
31

Page 32

5.8. The community will then work to deliver the projects they have identified including
considering appropriate delivery models and evaluate their success. 
6. Next Steps and Timescales
6.1. The following activity and timeline are proposed: 
Appointment of Independent Chair – Complete 
Adverts/public notices for membership of Neighbourhood Board – 26 March 2026 
Closing date for expressions of interest – 17 April 2026 
Shortleeting and interviews for Neighbourhood Board members – by end May 2026 
Report to Executive Committee – 24 June 2026 
Notification of successful candidates to UK Government – by end June 2026 
Community engagement – Summer– Autumn 2026 
Submission of Pride in Place Plan for Hamilton Town Centre – by 28 November 2026 
Approval of Pride in Place Plan for Hamilton Town Centre – spring 2027. 
7. Employee Implications
7.1. The meetings of the Board will be administered by Administration and Legal Services
within Finance and Corporate Resources. 
8. Financial Implications
8.1. Hamilton Town Centre will receive up to £20m over a 10-year period commencing in
2026/2027 until 2035/2036.  The funding will be split 63% towards capital works and
37% revenue funding.  The UK Government, however, advises that funding post
financial year 2028/2029 will be reviewed at the next Spending Review. 
8.2. Revenue funding will be paid out across two tranches in Year 1 (2026/2027) of the
programme – 50% will be made at the start of the financial year, which has been
received and the remaining 50% on approval of the Pride in Place Plan. 
8.3. The Pride in Place funding is in addition to the £8m approved for Hamilton Town
Centre as part of the 2025/2026 Budget. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The Neighbourhood Board will be encouraged to have due consideration to climate
change, sustainability and environmental considerations. 
10. Other Implications
10.1. The success of the Neighbourhood Board will be reliant on the on the community
coming together and having the drive and commitment to realise their vision over a
10-year period. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. The Neighbourhood Board will be encouraged to undertake Integrated Impact
Assessments where required as projects are developed. 
11.2. There is an obligation on the Neighbourhood Board to undertake community
consultation to establish the priority projects for Hamilton Town Centre. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
18 March 2026  
32

Page 33

Link(s) to Council Values/Priorities /Outcomes
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Working towards a sustainable future in a sustainable environment
 Thriving business, fair jobs and vibrant town centres 
Previous References
 Executive Committee of 4 February 2026 – Pride in Place – Hamilton Town Centre 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Alison Brown, Head of Enterprise and Sustainable Development
alison.brown@southlanarkshire.gov.uk 
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Executive Director (Housing and Technical Resources)  
Subject:   Land and Property Transfers and Disposals 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Executive Committee of the actions required in respect of land and
property transactions
1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the land detailed in Appendix A, which will be the subject of negotiated
transactions, be declared surplus to Council requirements.
[1recs]
3. Background
3.1. Details of land and property, which is potentially suitable for redevelopment or
disposal, are circulated to all Resources and Community Planning Partners to
establish if they are suitable for alternative operational use. 
3.2. Recommendations are made following the consideration of planning, title and other
legal constraints.  Any assets with competing interests are judged against Council
priorities, including the need for capital receipts. 
3.3. Transactions outwith the Property Bulletin process, where there is a requirement to
reallocate or declare property surplus as part of minor/adjoining sales, or to facilitate
a Council project, are not circulated through the Property Bulletin, however, the
details are included in this report. 
3.4. Transactions are only included in the report after successful consultation with the
holding Resource(s) and Planning. 
4. Non Bulletin Disposals
4.1. Appendix A details negotiated transactions where the land requires to be declared
surplus in order that Property Services can conclude negotiations for its disposal to
adjoining owners. 
4.2 The sale of land adjacent to the 51 Machan Road, Larkhall is to allow the land to be
incorporated into the proposed subdivision and redevelopment of a former nursery
for commercial use. The proposal has a planning consent (ref P/25/1121) and the
Council’s land is required for additional parking.
7
35

Page 36

5.  Employee Implications
5.1. There are no employee implications. 
6. Financial Implications
6.1. Capital receipts for both General Services and Housing Revenue Accounts will be
secured through the disposals identified in this report. 
7. Other Implications
7.1. There is a low risk that the capital receipts anticipated, as a result of declaring these
properties surplus, may not be realised if, for reasons outwith the Council’s control,
the purchasers choose not to proceed with the transactions.  However, the
procedures and consultations described in Sections 3 and 8 of this report have been
implemented to minimise this risk. 
7.2. There are no significant issues in terms of sustainability arising from this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.   
8.2. Consultation was undertaken with Planning, Roads, Legal, and the respective
holding resource prior to the inclusion in this report. 
Stephen Gibson
Executive Director (Housing and Technical Resources) 
25 February 2026 
Link(s) to Council Objectives/Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
List of Background Papers
 Plans of the land and property referred to in this report 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- Gerry McParland, Property Services Manager (Assets and Estates)
Ext: 5177  (Tel: 01698 455177)
E-mail:  gerry.mcparland@southlanarkshire.gov.uk 
36

Page 37

APPENDIX A - Land 
NON BULLETIN DISPOSALS 
Area  Description Holding
Account
Proposal Value
Band
579 sq m Land adjacent to 51 Machan
Road, Larkhall
Community
and
Enterprise
Car parking for
redevelopment of
former nursery
4
117 sq m Whitemoss Cottage, Whitemoss
Grove, East Kilbride, G74 3ED
Community
and
Enterprise
Garden
Ground/Parking
4
195 sq m 16 Grenville Drive, Cambuslang
G72 8DS
Housing
and
Technical
Garden Ground 4
40 sq m Land to the rear of 41-53
Gateside St, Hamilton, ML37JG
Housing
and
Technical
Encroachment
rectification
4
Value Bands
1 – over £1 million
2 – £500,000 to £999,999 
3 – £100,000 to £499,999 
4 – less than £100,000 
37

Page 38

38

Page 39

39

Page 40

40

Page 41

41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Executive Committee
Date of Meeting: 1 April 2026
Report by: Chief Executive  
Subject: After School Provision in South Lanarkshire 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a timeline for the reporting on after school provision in South Lanarkshire,
as agreed at Council on 11 March 2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that, further to the motion, as amended, agreed at the 11 March 2026 Full
Council meeting, the timeline for the reporting on after school provision in South
Lanarkshire be noted. 
3. Background
3.1. At the meeting of South Lanarkshire Council on 11 March 2026, the following motion,
as amended, was agreed:- 
‘The Council notes the range of after-school care provided across South Lanarkshire,
including provision on the Council estate, and considers that good-quality after-school
care can enhance communities, support families and improve outcomes for children
and young people. 
The Council further notes the range of providers and models of provision available
across Scotland, including not-for-profit provision. 
The Council commits to working with partners, including South Lanarkshire Leisure
and Culture, to create a supportive environment for after-school provision to emerge
across South Lanarkshire, subject to legal and commercial constraints, and requests
that a report be brought forward to a future meeting of the Executive Committee
addressing:- 
1. The extent and mix of after school provision across South Lanarkshire. 
2. Current and emerging issues in the development of after school provision. 
This should include consideration of the following; 
- A plan for engagement with our employability partners such as Routes to
Work South for example, who offer “Making it Work for Parents”, to
understand more about the barriers faced by parents, and how services can
and do support them. 
8
43

Page 44

- Consideration of the work and research of agencies such as One Parent
Families Scotland and Parenting Across Scotland, to understand more
about the particular needs of one-parent families. 
- Inclusion of the experiences of childminders, including our partnership
childminders, to recognise their place in the after-school care landscape 
- Exploration of how any work in this area could tie into the wider Marmot
Place work being carried out by the Council, both in terms of data-gathering
and strategic planning, since research has shown that there are
socioeconomic variations in the use of after-school provision.” 
3. Steps the Council can take to support the development of after school provision,
including on the Council-owned estate. 
4. The potential for Community Wealth Building approaches to support new after-
school provision. 
Any report which recommends engagement exercises to understand the after-school
landscape in South Lanarkshire must clearly state how the views and lived
experience of children and young people will be captured, to meet our obligations to
include their voices in the Council’s planning and delivery of services.’ 
4. Timeline for Review
4.1. At the Full Council meeting, the Chief Executive undertook to provide an update to this
Committee on the timeline for the agreed reporting on After School Provision. 
4.2. The anticipated timeline is outlined below:- 
Action Start Date Anticipated
Completion
Date
Working group to progress a number of workstreams
including:-
 investigate current after school provision and types of
providers
 supports available to parents/carers
 available research information
 benchmarking with other local authorities
 evaluation of the Council owned estate
 links to Marmot Place work
 potential for Community Wealth Building approaches
23 March
2026
30
September
2026
Engagement with providers, parents, young people and
employability partners.
20 April 2026 31 August
2026
Submission of initial findings report to Executive
Committee. 
28 October
2026 
44

Page 45

5. Employee Implications
5.1. There are no employee implications at the current time.  Work will be undertaken within
existing staff resources. 
6. Financial Implications
6.1. There are no financial implications in terms of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications in terms of
this report. 
8. Other Implications
8.1. There are no implications in terms of risk. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. There was no requirement to carry out an integrated impact assessment in relation to
the content of this report. 
9.2. The consultation and engagement arrangements are outlined in section 4.2. of the
report. 
Paul Manning
Chief Executive 
12 March 2026 
Link(s) to Council Values/Outcomes/Priorities
 Focused on people and their needs
 We will work to put people first and reduce inequality
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships
 Our children and young people thrive 
Previous References
 South Lanarkshire Council – 11 March 2026 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kevin Carr, Executive Director (Community and Enterprise Resources)
Ext:  3838 (Tel:  01698 453838)
E-mail: kevin.carr@southlanarkshire.gov.uk 
45

Page 46

46