Democracy Spraffa

Agenda Document Pack - Community and Enterprise Resources Committee - 06/02/2024

South Lanarkshire Council · 6 February 2024
Back to Community and Enterprise Resources Committee — 6 February 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 29 January 2024 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 06 February 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John Anderson,
Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Poppy Corbett, Andrea Cowan,
Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal
Johnston-Dempsey, Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian McAllan,
Kenny McCreary, Davie McLachlan, Carol Nugent, Helen Toner, David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lynsey Hamilton, Ross
Lambie, Lesley McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott,
David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources
Committee held on 7 November 2023 submitted for approval as a correct
record.  (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2023/2024
Joint report dated 15 January 2024 by the Head of Finance (Strategy) and the
Executive Director (Community and Enterprise Resources).  (Copy attached) 
15 - 24 
4 Community and Enterprise Resources - Capital Budget Monitoring
2023/2024
Joint report dated 15 January 2024 by the Head of Finance (Strategy) and the
Executive Director (Community and Enterprise Resources).  (Copy attached) 
25 - 28 
5 Community and Enterprise  - Workforce Monitoring - September to
November 2023
Joint report dated 21 December 2023 by the Chief Executive and the Executive
Director (Community and Enterprise Resources).  (Copy attached) 
29 - 36 
6 Community and Enterprise Resource Plan - Quarter 2 Progress Report
2023/2024
Report dated 11 January 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 66 
Item(s) for Decision 
7 Renewable Energy Fund - Strengthening Links to Rural Priorities
Report dated 22 December 2023 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
67 - 76 
8 Community Benefit Funds Middle Muir - Connect2Renewables Programme
Extension
Report dated 22 December 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
77 - 80 
9 Lanark Racecourse Masterplan and Wider Racecourse Update
Report dated 22 December 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
81 - 96 
10  South Lanarkshire Inward Investment Strategy
Report dated 22 December 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
97 - 102 
Item(s) for Noting 
2

Page 3

11  UK Levelling Up Fund - Round 3
Report dated 22 December 2023 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
103 - 106 
12  Community and Enterprise Resources - Notification of Contracts Awarded
- 1 April to 30 September 2023
Report dated 11 January 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
107 - 116 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385 403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Committee Room 1, Council Offices, Almada Street,
Hamilton on 7 November 2023 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Gerry
Convery, Councillor Poppy Corbett, Councillor Andrea Cowan, Councillor Margaret Cowie,
Councillor Maureen Devlin (Depute), Councillor Colin Dewar, Councillor Allan Falconer (substitute
for Councillor Andy Carmichael), Councillor Ross Gowland, Councillor Cal Johnston-Dempsey,
Councillor Susan Kerr, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Kenny
McCreary, Councillor Davie McLachlan, Councillor David Shearer (substitute for Councillor Gladys
Ferguson-Miller), Councillor David Watson 
Councillors' Apologies:
Councillor Andy Carmichael, Councillor Joe Fagan (ex officio), Councillor Gladys Ferguson-Miller,
Councillor Graeme Horne, Councillor Martin Lennon, Councillor Richard Lockhart, Councillor Carol
Nugent, Councillor Helen Toner 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
C Brown, Environmental Services Manager; F Carlin, Head of Planning and Regulatory Services; K
Carr, Head of Facilities, Waste and Grounds Services; C Park, Head of Roads, Transportation and
Fleet Services
Finance and Corporate Resources
J Davitt, Public Relations Team Leader; N Docherty, Administration Assistant; L Harvey, Finance
Manager; E Maxwell, Human Resources Business Partner; E-A McGonigle, Administration Officer; L
O’Hagan, Finance Manager (Strategy); M M Wilson, Legal Services Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 29
August 2023 were submitted for approval as a correct record. 
In relation to Item 14 on Whitemoss Tennis Courts in East Kilbride, Councillor Anderson
requested a timeline as to when members would receive information on the issues raised at the
previous meeting.  The Head of Enterprise and Sustainable Development Services advised that
officers were still working through those issues, but gave an undertaking to send members an
interim response as soon as possible and would follow up on the remaining points thereafter. 
The Committee decided: that the minutes be approved as a correct record. 
2
5

Page 6

3 Community and Enterprise Resources - Revenue Budget Monitoring 2023/2024 
A joint report dated 3 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted comparing actual
expenditure at 8 September 2023 against budgeted expenditure for 2023/2024 for Community
and Enterprise Resources. 
At 8 September 2023, there was a breakeven position against the phased budget. 
Details were also provided on proposed budget virements in respect of Community and
Enterprise Resources to realign budgets. 
The Committee decided: 
(1) that the breakeven position on Community and Enterprise Resources’ revenue budget, as
detailed in Appendix A of the report, be noted; and 
(2) that the budget virements, as detailed in appendices B to F of the report, be approved. 
[Reference: Minutes of 29 August 2023 (Paragraph 4)] 
4 Community and Enterprise Resources - Capital Budget Monitoring 2023/2024 
A joint report dated 16 October 2023 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ capital programme 2023/2024 and summarising the
expenditure position at 8 September 2023. 
The revised Capital Programme for 2023/2024 amounted to £39.602 million and this reflected a
net decrease of £3.323 million which was approved by the Executive Committee on 13
September 2023 (£3.417 million decrease) and 11 October 2023 (£0.094 million increase).
Details on those amendments were provided at Appendix A to the report.  Anticipated spend to
Expenditure at 8 September 2023 was £8.220 million, which had resulted in the Resource being
£0.103 million ahead of programme.   
The Head of Roads, Transportation and Fleet Services responded to a member’s questions in
relation to the Glasgow City Region City Deal project at Stewartfield Way, East Kilbride and the
Park and Ride project at Hairmyres Station, East Kilbride. 
The Committee decided: that the Community and Enterprise Resources’ capital
programme of £39.602 million, and expenditure to date of
£8.323 million, be noted. 
[Reference: Minutes of the Executive Committee of 13 September 2023 (Paragraph 4) and 11
October 2023 (Paragraph 4) and Minutes of 29 August 2023 (Paragraph 6)] 
5 Community and Enterprise Resources - Workforce Monitoring – July and August
2023 
A joint report dated 14 September 2023 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period July and August
2023:- 
 attendance statistics
6

Page 7

 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 10 June 2023 
The Human Resources Business Manager responded to a member’s question in relation to the
increase in referrals to Employee Support Officers.   
The Committee decided: that the report be noted. 
[Reference:  Minutes of 29 August 2023 (Paragraph 7)] 
6 Rutherglen Town Centre Strategy and Action Plan
A report dated 16 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on the consultative draft Rutherglen Town Centre Strategy and
Action Plan. 
The town centre strategy and action plan for Rutherglen followed 4 previous strategies for
Hamilton, Blantyre, Cambuslang and Larkhall.  Those strategies sought to engage with local
businesses and communities to create a dynamic action plan to tackle issues within the various
town centres and help repurpose them for the future.   
Supporting town centres remained a Council priority and the Council worked closely with
appropriate groups and organisations, through a partnership approach, to achieve common
goals.  It was recognised that town centres across the UK were in a transitional stage and faced
broad and complex issues.  Factors such as the economic downturn, the COVID-19 pandemic,
the growth of online shopping, out-of-town shopping malls, changes in retailer’s business
models and consumer expectation had resulted in a decline in town centre footfall.  Rutherglen
was, however, performing better than some towns in South Lanarkshire. 
The consultative draft Rutherglen Town Centre and Action Plan, which was attached as an
appendix to the report, set out a range of initiatives which the Council would pursue with
partners to support the vitality and viability of the town centre.  The private sector had a key role
in providing shopping services and leisure offers that would meet the needs of the local
community.  This private sector support, coupled with strengthening links between local
businesses and the community, would provide a strong base to drive town centre activity
forward. 
The consultative draft Rutherglen Town Centre Strategy and Action plan:- 
 recognised a series of objectives for Rutherglen which were consistent with the activity
being promoted by Scotland’s Towns Partnerships (STP) and others, so that a
collaborative approach across all sectors could be adopted
 used a similar approach to that undertaken in previous town centre strategies, however,
the process had evolved and improved by using a range of information gathered through
engagement and research undertaken in partnership with the Improvement Service’s
Shaping Places for Wellbeing team 
A Place and Wellbeing Assessment had been carried out which enabled officers to take a
systematic approach to identify impacts and recommendations for consideration to maximise
benefits to the wellbeing of people and place and minimise negative impacts.  Issues identified
from the assessment were categorised under a set of Place and Wellbeing Outcomes, which fell
into 5 overarching themes with relevant sub themes under each.  Those themes produced a set
of outcomes from which actions were identified. 
7

Page 8

2026 marked the 900th anniversary of the Charter of the Royal Burgh of Rutherglen, the oldest
Royal Burgh in Scotland. The town centre would be the key focus of celebrations to mark this
occasion.  Work on this initiative would progress in parallel with the Strategy and Action Plan
and would support and complement the growing programme of community led events leading up
to the Rutherglen 900 celebrations. 
It was intended that the consultative draft Rutherglen Town Centre Strategy and Action Plan
would be published and made available for consultation, both online and in person, during
February and March 2024.  Following consideration of feedback received, a finalised Strategy
would be presented to the Committee in June 2024.  Officers from Enterprise and Sustainable
Development Services would implement the plan and liaise with other Services and partner
organisations to deliver the agreed outcomes.   
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: 
(1) that the consultative draft Rutherglen Town Centre Strategy and Action Plan be approved;
and 
(2) that the arrangements for a period of consultation, as outlined in section 5 of the report, be
approved. 
7 Discover Lanark Business Improvement District – Renewal Ballot
A report dated 18 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted outlining the Council’s support for the business proposal prepared by
the Discover Lanark Business Improvement District (BID) for the period 1 September 2024 to 31
August 2029, and associated Council support. 
The Executive Committee had approved the Council’s support for the creation of a BID for
Lanark at its meeting on 19 December 2018.  Discover Lanark represented the businesses in a
defined area of the town and delivered a series of initiatives which were set out in its Business
Plan.  The BID was established through a ballot process and, if successful, remained in place
for 5 years.  The BID was funded by a levy from the businesses they represented which was
collected on their behalf by the Council. 
The Council had carried out its statutory obligations to collect the BID levy from eligible
businesses during the current BID period.  The transfer of monies raised through the levy to the
BID company was regulated by the statutory instruments regulating BIDs in Scotland.  An
Operating Agreement was in place alongside the statutory legal guidance which dealt with the
practicalities of the process. 
The current 5-year BID would come to an end on 31 August 2024.  Under BID legislation, the
BID must hold a ballot to all members to establish if the BID should be renewed for a further 5
years or whether the BID company should be wound up.  The BID Business Plan for the period
1 September 2024 to 31 August 2029 was provided at the appendix to the report and set out the
proposed projects, the BID area and the levy that would be payable by the affected businesses.   
The Council had an important role in supporting and working alongside the BID company to
ensure that projects and initiatives were complementary and were beneficial to the town.  The
proposals for the support that the Council would continue to provide were set out at section 4.1
of the report.
8

Page 9

Enterprise and Sustainable Development Services would continue to be the principal point of
contact with the BID using existing staff resources.  The IT collection system used to collect the
levy had a maintenance cost of £2,000 per annum and funding for this had been identified from
existing Resource budgets. 
The Committee decided: 
(1) that support for the BID to deliver the objectives of the business proposal prepared by
Discover Lanark, as set out in the BID Business Plan attached at Appendix 1 of the report,
be approved; and 
(2) that it be approved that the Council continues to actively support the BID through the range
of measures, as set out in section 4 of the report. 
[Reference: Minutes of the Executive Committee of 19 December 2018 (Paragraph 10)] 
8 Approval of South Lanarkshire Council’s Food Service Plan for 2023/2024
A report dated 9 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted seeking approval for the Food Service Plan 2023/2024 developed for
the Council in accordance with, and required by, The Food Law Code of Practice (Scotland)
2019 and the draft Administration and Service Planning Food Law Code of Practice (Scotland)
2020. 
Local authorities had a statutory duty to enforce legislation relating to food.  This was achieved
by carrying out official controls in food establishments which comprised of inspections, audits,
monitoring, surveillance, or sampling.  The legislation was supported by Codes of Practice
issued under Section 40 of the Food Safety Act 1990, Regulation 24 of the Food Hygiene
(Scotland) Regulations 2006, and Regulation 6 of the Official Feed and Food Controls
(Scotland) Regulations 2009.  Food authorities were required to have regard to those Codes
when discharging their duties. 
The statutory obligation in the Food Safety Act 1990 and associated legislation applied to the
delivery of official controls by local authorities to ensure that:- 
 official controls were effective and appropriate
 controls were applied at an appropriate risk-based frequency
 there were sufficient numbers of qualified and competent staff with adequate facilities and
equipment to carry out duties
 staff were free from conflicts of interest
 there was access to adequate laboratory capacity and capability for testing 
The Food Law Code of Practice (Scotland) 2019 instructed Food Authorities to:- 
 ensure those statutory obligations were brought to the attention of local authority officials
and/or elected member bodies responsible for agreeing budgets or other service
arrangements relevant to the delivery of official controls.
 complete an annual Service Plan which detailed the programme for the year, ensuring it
was adequately resourced, and approved at the appropriate governance level within the
local authority 
The Food Service Plan for 2023/2024 was provided in the appendix to the report.  A draft copy
of the Plan had been submitted to Food Standards Scotland in July 2023 and no adverse
comments had been received.  Following approval of the Plan by this Committee, the final
version would be submitted to Food Standards Scotland.  
9

Page 10

The Food Service Plan 2023/2024 had been developed in accordance with the requirements of
the Food Law Code of Practice (Scotland) 2019 and the draft Administration and Service
Planning Food Law Code of Practice (Scotland) 2020.  The draft Plan had reflected staffing
resources available at that time, however, Food Safety Officers had been recruited during
summer 2023 and as at September 2023, the Food and Business Regulation team was
operating at a full establishment and this was reflected in the updated Plan. 
Future updates on the Food Service Plan would be reported to the Committee on an annual
basis. 
The Committee decided: 
(1) that the Food Service Plan for 2023/2024 be approved; and 
(2) that the Food Service Plan continues to be reported to the Committee on an annual basis
for approval. 
9 Community Benefit Funds – Renewable Energy Fund – Grant Application 
A report dated 16 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on a grant application to the Community Benefit Fund.  Community
Benefit Funds had been established to provide funding to suitable projects providing community
benefit in eligible areas. 
It was proposed that, subject to the applicant providing written confirmation that all other
additional funding for the project had been secured, a grant of up to £58,354.22 towards eligible
costs associated with installation of the village green lighting project be awarded from the
Auchrobert Windfarm Renewable Energy Fund (REF). 
The Head of Enterprise and Sustainable Development Services responded to a member’s
question in relation to how the grant funding would be used. 
The Committee decided: that, subject to the applicant providing written confirmation
that all other additional funding for the project had been
secured, a grant be awarded of up to a maximum of
£58,354.22 towards eligible costs associated with
installation of the village green lighting project from the
Auchrobert Windfarm Renewable Energy Fund. 
[Reference: Minutes of 29 August 2023 (Paragraph 8)] 
10 Pavement Parking
A report dated 10 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the progression of the national ban on
pavement parking, double parking, and parking at dropped kerbs Regulations. 
Part 6 of the Transport Scotland (Scotland) Act 2019 introduced the statutory framework for a
national ban on pavement parking, double parking and parking at dropped kerbs to make it
easier for local authorities to ensure pavements and roads were safer and more accessible to
all.  Key provisions included:- 
 providing local authorities with powers to enforce the national ban
 enabling local authorities to promote exemptions from the national ban, subject to meeting
strict criteria
10

Page 11

 providing exceptions to certain vehicles if they were involved in emergencies or the
delivery of goods
 providing local authorities with powers to share services with other councils to enforce the
new restrictions
 requiring local authorities to keep accounts in relation to the money received from the
enforcement of the new restrictions 
Although the Transport (Scotland) Act 2019 had been enacted, local authorities had not yet
received the additional enforcement powers or full guidance which would enable them to
effectively enforce pavement parking, double parking and parking at dropped kerbs.  A statutory
duty would require the Council to comply with the requirements of the relevant legislation.
However, a statutory power, as was the case with this legislation, gave the Council discretion as
to whether the power was exercised.  Draft Regulations were laid in the Scottish Parliament on 2
October 2023 and were expected to come into force on 11 December 2023.   
Detailed information on the enforcement and implementation of the Regulations was provided at
section 4 of the report and included the following information:- 
 the Council had a statutory duty, under the Roads (Scotland) Act 1984, to manage and
maintain road networks
 the Road Traffic Act 1991 had introduced provisions enabling the decriminalisation of most
non-endorsable parking offences in London and permitted similar arrangements to be
introduced elsewhere in the UK by secondary legislation
 Decriminalisation Parking Enforcement (DPE) was a regime that enabled a local authority
to enforce its own parking policies and included issuing Penalty Charge Notices (PCNs) to
motorists who breached parking controls in specified areas.  There were 21 local
authorities in Scotland, including South Lanarkshire, with DPE powers
 Transport Scotland had been progressing the secondary legislation and updated parking
standards guidance that would underpin enforcement of those parking prohibitions.  This
was due to be issued on 11 December 2023 and, thereafter, it would be up to local
authorities to determine timeframes for implementation
 although it would be desirable for all local authorities to commence enforcement of the
Regulations at the same time to ensure a consistent approach, many had differing DPE
regimes in place.  It was likely to be spring/summer 2024 before local authorities could
effectively and robustly undertake enforcement
 Transport Scotland was aware that not all local authorities would have the capability or
plans to undertake enforcement from day one
 there would be a national awareness campaign which would focus on the effects of
pavement parking and highlight the possibility of receiving a penalty from 11 December
2023   
The Council had actively engaged over the last few years during progression of the legislation,
assisting Transport Scotland.  The Bill for the Transport (Scotland) Act 2019 had been passed
by parliament on 10 October 2019 and received Royal Assent on 15 November 2019 and since
that time, Transport Scotland had undertaken various consultations in respect of the
implementation of Directions and Regulations.  Those consultations were detailed at section 5.3
of the report. 
The next steps were outlined at section 6 of the report and included:- 
 undertaking a more comprehensive assessment of locations to be considered for
exemption whilst the guidance was under review
 taking a balanced, proportionate, and pragmatic approach to implementation of
enforcement of the national ban following ministerial approval in December 2023
11

Page 12

 adopting a low key “soft” approach that ensured any enforcement action taken, if any, was
commensurate with the resources available, and fully considered the impacts and/or
displacement that would be experienced across towns, villages or within residential areas.
The full parking guidance would be considered along with the evidence gathered by the
location assessments and intelligence gathered on the ground.  The use of advisory
warnings would also be considered if necessary
 the draft Regulations outlined that the PCN would be issued at £100, which would be
discounted to £50 for payments made within 14 days, however, would increase to £150 if a
Charge Certificate was issued.  Those charges were in line with other PCNs issued in
South Lanarkshire 
There were currently 14 full time equivalent (FTE) Parking Attendants who undertook parking
enforcement across South Lanarkshire.  A recruitment exercise was progressing for 4 Parking
Attendant vacancies.  A review was also underway to ensure that the Council could deliver a
proportionate level of enforcement to implement the requirements of Part 6 of the Transport
(Scotland) Act 2019.  Parking Attendants operated on a rota system of working 5 days over 7,
however, it was anticipated that enforcement would be required during times outwith the current
schedule.   
It was expected that any income generated from the new power would contribute to the running
costs of the Service and was unlikely to generate any over recovery given that the operations of
the Parking Unit was running at a predicted shortfall in 2023/2024 of around £0.76 million.  The
implementation of exemptions would also incur costs and those would be a key consideration
when locations for exemptions were considered.  The Council had received funding of £0.144
million from the Scottish Government to allow for the exemption assessments to be undertaken
and a consultant had been commissioned to conduct this exercise which was expected to be
concluded at the turn of the calendar year. 
There followed a lengthy discussion during which members:- 
 expressed concern that enforcement could be an issue without an increase in the number
of Parking Attendants
 stressed the importance of the level of fines reflecting the cost of running the service 
 requested further information on what the “soft” approach would look like in practice
 expressed concern that there could be displacement of vehicles in certain areas resulting
from the national ban
 stressed the importance of the Council undertaking a promotional campaign in advance of
any enforcement activity
 recognised the importance of adequate funding being allocated for implementation given
that this was an Act of the Scottish Parliament 
The Head of Roads, Transportation and Fleet Services responded to members’ questions on
various aspects of the report. 
The Committee decided: 
(1) that the contents of the report be noted, specifically the enforcement powers expected to
be granted to councils this year; and 
(2) that it be noted that a ‘soft’ approach to any resulting enforcement, as detailed at
paragraph 6.5, would be undertaken and a further update provided to the Committee at an
appropriate point during 2024.
12

Page 13

11 Update of the Community and Enterprise Resources’ Risk Register and Risk
Control Plan
A report dated 16 October 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on providing an update on Community and Enterprise Resources’
Risk Register and Risk Control Actions. 
The risks were scored in accordance with the Council’s scoring mechanism which scored risks
based on likelihood and impact of risk.  This resulted in risks being scored between 1 to 25 (low
to very high).  Risks were scored on their inherent risk (risk if nothing was done) and their
residual risk (risk after applying controls).  The risk scoring matrix was attached at Appendix 1 to
the report. 
The Risk Register had been developed and was monitored on an ongoing basis to add any new
risks and to review the scores of existing risks.  The main changes to the Community and
Enterprise Resources’ register were as follows:- 
 the addition of the following 4 new top risks -
 failure to deliver the outcomes of the Economic Strategy
 implications of the Scottish Fire and Rescue Service (SFRS) Unwanted Fire Alarm
Signals Policy within the Council’s non-domestic estate
 the inability to maintain infrastructure, assets and property in a safe and well-
maintained condition and failure to achieve objectives of asset/property reviews
 the potential for industrial action to disrupt council services
 the top risk around the increasing levels of adverse weather had been expanded to cover
potential damage to Council properties and housing stock from weather events and was
now a joint risk with Housing and Technical Resources
 although the scoring of the Council top risk around the Council failing to meet statutory and
legislative duties in respect of public protection had increased from 12 to 16, the improved
workforce position within Environmental Services had reduced for this score on the
Resources’ register to 9
 2 Economic Development risks covering external funding and derelict/contaminated land
had been merged into a combined risk which would be managed by a single set of control
measures 
Risks scored 15 to 25 were considered very high and risks scored 8 to 12 were considered high
risks.  The top risks identified for the Resource were detailed in Appendix 2 to the report. 
Comparisons of risk scores for 2022 and 2023 were detailed in Appendix 3 to the report. 
The Committee decided: 
(1) that the current position with regards to the Community and Enterprise Resources’ Risk
Register be noted; and 
(2) that it be noted that any outstanding Risk Control Actions identified during the year would
be progressed by relevant officers. 
[Reference: Minutes of 13 December 2022 (Paragraph 6)] 
12 Community and Enterprise Resources – Notification of Contracts Awarded – 1
October 2022 to 31 March 2023
A report dated 16 September 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on contracts awarded by Community and Enterprise Resources in
the period 1 October 2022 to 31 March 2023.
13

Page 14

In terms of Standing Order Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources
were required to notify the relevant Committee of contracts awarded.  Details of the contracts
awarded by Community and Enterprise Resources were provided in the appendix to the report. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 4 October 2022 (Paragraph 13)] 
13 Urgent Business 
There were no items of urgent business. 
14

Page 15

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 6 February 2024
Report by: Head of Finance (Strategy)  
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 1 December 2023 for Community and Enterprise
Resources
 provide a forecast for the year to 31 March 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the forecast to 31 March 2024 of a breakeven position after approved
transfers to reserves as detailed in Appendix A of the report, be noted;
(2) that the breakeven position as at 1 December 2023 on Community and
Enterprise Resources’ revenue budget, as detailed in Appendix A of the report,
be noted; 
(3) that the approach for the proposed changes to the payment of utilities by the
Council on behalf of South Lanarkshire Leisure and Culture (SLLC), as detailed
in section 6 of the report, to deliver a VAT saving be approved; and
(4) that the proposed budget virements as detailed in appendices B to F be
approved.
[1recs]
3. Background
3.1. This is the third revenue budget monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2023/2024. 
3.2. The Resource has completed its formal probable outturn exercise for the year
identifying expected spend to the 31 March 2024.  Details are outlined in section 5
below. 
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A and the individual services’ reports in appendices B to F, including
variance explanation. 
4. Employee Implications
4.1. None 
3
15

Page 16

5. Financial Implications
5.1. Probable Outturn: Following the Council’s probable outturn exercise, the Resource
is reporting a breakeven position after approved transfers to reserves of £0.240 million
at 31 March 2024.  The Resource position is detailed in Appendix A and the transfers
to reserves by service area are noted in appendices B to F where relevant.   
5.2 The Resource is showing a breakeven position and this is due to underspends in
employee costs across all services, costs within Roads, Transportation and Fleet
services in relation to transport costs, depots, charging of electric vehicles, and an
under recovery in parking income, the cost of bin replacement with the Waste Service,
cleaning materials in Facilities, medicals and IT costs across all services, offset by a
marginal over recovery of income from Planning and Building applications.   
5.3 Position as 1 December 2023:  The Resource position as at 1 December 2023 is a
breakeven position after approved transfers to reserves.  Appendix A outlines this
position and the breakeven position in the main reflects underspends within employee
costs and these are supporting costs within Roads, Transportation and Fleet Services
in relation to transport costs and an under recovery in parking income. 
Detailed variance explanations by service area are included in appendices B to F.     
5.4 Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements are detailed in the appendices B to F of this report. 
6. SLLC Utilities Adjustment
6.1 An exercise has been completed to look at the payment arrangement for utility costs
for Council owned, SLLC operated assets.  This exercise has considered the ability of
the Council to reclaim the VAT costs that are incurred on expenditure on gas and
electricity.  
6.2. The proposal is that the Council would be responsible for, contract for and pay the
utility costs for SLLC properties and, as SLLC will no longer be responsible for the
expenditure, the management fee payable to SLLC will reduce by the same amount.
For illustration, for 2022/2023 the costs of utilities would have been £5.516 million. 
6.3. The costs to the Council would change every year due to price and consumption
changes.  Therefore, an annual review of the management fee would be required to
ensure there was no detriment to the Council’s financial position in relation to
consumption risk, as this would remain with SLLC.  The net financial impact for SLLC
of this move will change every year, however, it is expected to be in the region of
£0.300 million. 
6.4. The new arrangement will require changes to be made to the leases the Council holds
with SLLC for the use of facilities (to specify that the obligation to pay for utilities costs
will lie with South Lanarkshire Council as the landlord) and to the level of management
fee payable to SLLC. 
6.5 The change will be effective from 2024/2025 and would be reflected in the 2024/2025
budget for Community and Enterprise Resources.  The Committee is asked to approve
this approach.   
16

Page 17

7. Climate Change, Sustainability and Environmental Implications
7.1 There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s revenue budget is that there is an
overspend.  There are inflationary and budget pressures including utilities (as well as
general inflation pressures) this year which increase the risk of overspend however
additional funding has been provided in this year’s budget strategy.  There are
underspends in employee costs which are also supporting increasing inflationary
pressures. 
8.2. We will also continue to monitor the actual impact through four weekly budget
monitoring meetings at which any variance is analysed. In addition, the probable
outturn exercise ensures early warning for corrective action to be taken where
appropriate. 
9. Equality Impact Assessment and Consultation Arrangements
9.1 This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required. 
9.2 There is also no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Head of Finance (Strategy) 
David Booth
Executive Director (Community and Enterprise Resources) 
15 January 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial ledger and budget monitoring results to 1 December 2023. 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Louise Harvey, Finance Manager
Ext:  2658 (Tel: 01698 452658)
E-mail: louise.harvey@southlanarkshire.gov.uk  
17

Page 18

Appendix A 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
Community and Enterprise Resources Summary 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23 
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 102,427 98,367 4,060 4,060 65,386 63,247 2,139 under 3.3% 
Property Costs 5,300 5,500 (200) (200) 3,063 3,166 (103) over (3.4%) 
Supplies & Services 18,831 19,970 (1,139) (1,179) 10,667 10,999 (332) over (3.1%) 
Transport & Plant 23,031 23,945 (914) (914) 15,292 16,237 (945) over (6.2%) 
Administration Costs 803 1,007 (204) (204) 529 622 (93) over (17.6%) 
Payments to Other Bodies 12,992 13,094 (102) (102) 5,731 5,731 0 - 0.0% 
Payments to Contractors 47,461 50,110 (2,649) (2,849) 30,623 31,098 (475) over (1.6%) 
Transfer Payments 617 617 0 0 308 308 0 - 0.0% 
Financing Charges 184 229 (45) (45) 17 21 (4) over (23.5%) 
Total Controllable Exp. 211,646 212,839 (1,193) (1,433) 131,616 131,429 187 under 0.1% 
Total Controllable Inc. (72,367) (73,800) 1,433 1,433 (45,479) (45,292) (187) under
recovered (0.4%) 
Net Controllable Exp. 139,279 139,039 240 0 86,137 86,137 0 - 0.0% 
Transfer to Reserves 
(as at 01/12/23) - 240 (240) - - 0 0 - n/a 
Position After Transfers to
Reserves 
(as at 01/12/23)
139,279 139,279 0 0 86,137 86,137 0         - 0.0% 
Variance Explanations 
Detailed in appendices B to F. 
Budget Virements 
Budget virements are shown in appendices B to F. 
Approved Transfers to Reserves 
Detailed in appendices B to F 
18

Page 19

Appendix B 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
Facilities, Waste and Grounds Services 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 65,604 63,743 1,860 1,860 42,103 41,186 917 under 2.2% 1,b,c,e
Property Costs 2,131 2,258 (127) (127) 1,174 1,240 (66) over (5.6%) 2,a,d,e
Supplies & Services 8,897 9,531 (634) (634) 4,819 5,083 (264) over (5.5%) 3,a,b,e
Transport & Plant 9,263 9,040 223 223 6,096 6,127 (31) over (0.5%) a,b,e
Administration Costs 176 234 (58) (58) 82 128 (46) over (56.1%) 4
Payments to Other Bodies 55 49 6 6 37 37 0 - 0.0% 
Payments to Contractors 17,587 18,368 (780) (780) 10,957 10,968 (11) over (0.1%) b,e
Transfer Payments 0 0 0 0 0 0 0 - n/a 
Financing Charges 44 59 (15) (15) 8 9 (1) over (12.5%) 
Total Controllable Exp. 103,757 103,282 475 475 65,276 64,778 498 under 0.8% 
Total Controllable Inc. (20,557) (20,409) (148) (148) (12,809) (12,743) (66) under
recovered (0.5%) 5,e
Net Controllable Exp. 83,200 82,873 327 327 52,467 52,035 432 under 0.8% 
Transfer to Reserves 
(as at 01/12/23) - - - - - 0 0 - n/a 
Position After Transfers to
Reserves 
(as at 01/12/23)
83,200 82,873 327 327 52,467 52,035             432     under 0.8% 
Variance Explanations 
1.        The variance is due to vacancies that are being actively recruited within all services.
2.  The overspend is due to higher than anticipated spend on cleaning materials within Facilities. 
3.  The overspend is mainly due to higher than anticipated expenditure on bin purchases within Waste, along with higher than anticipated expenditure on
equipment repairs and a payment for the cashless system within Facilities. 
4.  The overspend is mainly due to an overspend on medical costs within the service along with printing costs within Facilities Management.  
5. The under recovery of income mainly relates to the decrease in uptake of the Care of Gardens Service with Grounds, cleaning service movements
within Facilities, partially offset by an over recovery within Waste because of additional service requests from Housing and Tech. 
Budget Virements 
a. Removal of budget in respect of Procurement savings. Net effect (£0.038m): Property (£0.004m), Supplies and Services (£0.028m), Transport and Plant
(£0.006m).
b. Transfer from Reserves in respect of Front Line First and Strategic Waste Fund. Net effect £0.682m: Employees £0.126m, Supplies and Services
£0.100m, Transport and Plant £0.306m, Payment to Contractors £0.150m.
c. Transfer of budget in relation to pay award. Net effect £4.793m: Employees £4.793m
d. Transfer of budget in respect of additional rates poundage and utilities. Net effect £0.194m: Property £0.194m.
e. Realignment of budget to reflect service provision within Grounds and Facilities. Net effect £0.000m: Employees £0.102m, Property (£0.006m), Supplies
and Services £0.022m, Transport and Plant £0.001m, Payment to Contractors (£0.056m), Income (£0.063m). 
19

Page 20

Appendix C 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
Planning and Regulatory Services 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 7,844 7,624 220 220 5,066 4,886 180 under 3.6% 1,b
Property Costs 38 33 5 5 8 7 1 under 12.5% a
Supplies & Services 183 304 (121) (121) 125 149 (24) over (19.2%) 2
Transport & Plant 126 206 (80) (80) 77 88 (11) over (14.3%) 
Administration Costs 132 148 (16) (16) 85 94 (9) over (10.6%) c
Payments to Other Bodies 275 182 93 93 71 71 0 - 0.0% c
Payments to Contractors 1,145 1,750 (605) (605) 890 1,354 (464) over (52.1%) 3,c
Transfer Payments 0 0 0 0 0 0 0 - n/a 
Financing Charges 46 62 (16) (16) 3 3 0 - 0.0% 
Total Controllable Exp. 9,789 10,309 (520) (520) 6,325 6,652 (327) over (5.2%) 
Total Controllable Inc. (4,407) (5,291) 884 884 (2,713) (3,161) 448 over
recovered 16.5% 4
Net Controllable Exp. 5,382 5,018 364 364 3,612 3,491 121 under 3.3% 
Transfer to Reserves 
(as at 01/12/23) - - - - - - - - n/a 
Position After Transfers to
Reserves 
(as at 01/12/23)
5,382 5,018 364 364 3,612 3,491 121 under 3.3% 
Variance Explanations 
1. The variance is due to vacant posts within the services which are being recruited.
2. The variance represents greater than budgeted costs on an IT system upgrade within Planning and Building Standards.
3. The variance is mainly due to an increase in demand for clinical waste services, this is offset by an over recovery of income within Environmental
Services.
4. The over recovery relates to income received for clinical waste which offsets the expenditure overspend within payment to contractors. The overall
over recovery is partially offset by the lower demand for Planning and Building applications. 
Budget Virements 
a. Transfer of budget in respect of utilities. Net effect (£0.003m): Property (£0.003m). 
b. Transfer of budget in relation to pay award. Net effect £0.419m: Employees £0.419m.
c. Realignment of budget to reflect service delivery within Projects. Net effect £0.000m: Administration £0.014m, Payment to Other Bodies £0.010m,
Payment to contractor (£0.024m). 
20

Page 21

Appendix D 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
South Lanarkshire Leisure and Culture 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 4 6 (2) (2) 4 4 0 - 0.0% 
Property Costs 98 108 (10) (10) 92 92 0 - 0.0% 
Supplies & Services 0 0 0 0 0 0 0 - n/a 
Transport & Plant 0 0 0 0 0 0 0 - n/a 
Administration Costs 8 8 0 0 8 8 0 - 0.0% 
Payments to Other Bodies 80 93 (13) (13) 0 0 0 - n/a 
Payments to Contractors 23,048 22,848 200 0 16,759 16,759 0 - 0.0% a
Transfer Payments 0 0 0 0 0 0 0 - n/a 
Financing Charges 0 0 0 0 0 0 0 - n/a 
Total Controllable Exp. 23,238 23,063 175 (25) 16,863 15,863 0 - 0.0% 
Total Controllable Inc. (11) (19) 8 8 (11) (11) 0 -  n/a 
Net Controllable Exp. 23,227 23,044 183 (17) 16,852 16,852 0 - 0.0% 
Transfer to Reserves 
(as at 01/12/23) - 200 (200) - - - - -  
Position After Transfers to
Reserves 
(as at 01/12/23)
23,227 23,244 (17) (17) 16,852 16,852 0      -  0.0% 
No significant variance explanations to report 
No budget virements to report     
Approved Transfers to Reserves (£0.200m): 
i. Community Led Investments (£0.200m) 
21

Page 22

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
Enterprise and Sustainable Development 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 5,599 5,238 361 361 3,651 3,490 161 under 4.4% 1,a,d,e
Property Costs 1,234 1,233 1 1 548 546 2 under 0.4% c,g
Supplies & Services 245 248 (3) (3) 91 100 (9) over (9.9%) 
Transport & Plant 47 44 3 3 45 43 2 under 4.4% 
Administration Costs 89 85 4 4 25 25 0 - 0.0% f
Payments to Other Bodies 6,707 6,710 (3) (3) 964 964 0 - 0.0% b,c,d,e
Payments to Contractors 369 469 (100) (100) 9 9 0 - 0.0% d
Transfer Payments 0 0 0 0 0 0 0 - n/a 
Financing Charges 44 47 (3) (3) 3 3 0 - 0.0% 
Total Controllable Exp. 14,334 14,074 260 260 5,336 5,180 156 under 2.9% 
Total Controllable Inc. (8,361) (8,410) 49 49 (3,627) (3,632) 5 over
recovered 0.1% c,e
Net Controllable Exp. 5,973 5,664 309 309 1,709 1,548 161 under 9.4% 
Transfer to Reserves 
(as at 01/12/23) - - - - - - - - n/a 
Position After Transfers to
Reserves 
(as at 01/12/23)
5,973 5,664 309 309 1,709 1,548 161       under 9.4% 
Variance Explanations 
1. This variance is mainly due to vacant posts within the services which are being recruited. 
Budget Virements 
a. Transfer of budget in relation to pay award. Net effect £0.305m: Employees £0.305m.
b. Transfer of budget for capital funded from revenue in respect of Business Infrastructure. Net Effect (£0.026m): Payment to Other Bodies (£0.026m). 
c. Establish budgets in respect of Hamilton Palace Grounds, Area Regeneration, Community led Local Development, Hamilton Towers. Net effect
£0.000m: Property £0.694m, Payment to Other Bodies £0.704m, Income (£1.398m).
d. Transfer from reserves in respect of Social Enterprise and Support Programme, Locate in South Lanarkshire, Tourism Cooperative and Strategy, Food
Strategy Support fund and Climate Change South Lanarkshire. Net Effect £0.947m: Employees £0.031m, Payment to Other Bodies £0.556m,
Payment to Contractors £0.360m.
e. Realignment of budget to reflect service delivery within the service. Net effect £0.000m: Employees £0.020m, Payment to Other Bodies £0.055m,
Income (£0.075m).
f. Removal of budget in respect of procurement savings. Net effect (£0.003m): Administration (£0.003m).
g. Transfer of budget in respect of utilities. Net effect £0.019m: Property £0.019m. 
22

Page 23

Appendix F 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources: Period 9 Ended 1 December 2023 (No. 9) 
Roads, Transportation and Fleet Services 
Annual
Budget 
Forecast
for Year
BEFORE
Transfers
Annual
Forecast
Variance
BEFORE
Transfers
Annual
Forecast
Variance
AFTER
Transfers
Budget
Proportion
01/12/23
Actual 
BEFORE
Transfers
01/12/23
Variance 
01/12/23 
%
Variance
01/12/23
Note 
£000 £000 £000 £000 £000 £000 £000   
Budget Category           
Employee Costs 23,376 21,755 1,621 1,621 14,562 13,681 881 under 6.0% 1,a,d
Property Costs 1,799 1,868 (69) (69) 1,241 1,281 (40) over (3.2%) 2,b,c,d
Supplies & Services 9,506 9,887 (381) (421) 5,632 5,667 (35) over (0.6%) 3,b,c
Transport & Plant 13,595 14,655 (1,060) (1,060) 9,074 9,979 (905) over (10.0%) 4,c,d
Administration Costs 398 532 (134) (134) 329 367 (38) over (11.6%) 5
Payments to Other Bodies 5,875 6,060 (185) (185) 4,659 4,659 0 - 0.0% d
Payments to Contractors 5,312 6,676 (1,364) (1,364) 2,008 2,008 0 - 0.0% d,e
Transfer Payments 617 617 0 0 308 308 0 - 0.0% 
Financing Charges 50 61 (11) (11) 3 6 (3) over (100.0%) 
Total Controllable Exp. 60,528 62,111 (1,583) (1,623) 37,816 37,956 (140) over (0.4%) 
Total Controllable Inc. (39,031) (39,671) 640 640 (26,319) (25,745) (574) under
recovered 2.2% 6,d
Net Controllable Exp. 21,497 22,440 (943) (983) 11,497 12,211 (714) over (6.2%) 
Transfer to Reserves 
(as at 01/12/23) - 40 (40) - - 0 0  n/a 
Position After Transfers to
Reserves 
(as at 01/12/23)
21,497 22,480 (983) (983) 11,497 14,927 (714) over (6.2%) 
Variance Explanations 
1.  The variance relates to staff turnover and vacancies within Roads and Fleet which are being recruited.  
2. The overspend is mainly due to higher than anticipated costs in the upkeep of the Roads depots.
3. The overspend is due to IT costs in respect of a system upgrade within the Fleet.
4. The variance is mainly due to the timing of efficiencies and greater than anticipated expenditure in the workshop within Fleet services.
5. The overspend is due to a greater than budgeted spend on printing & stationery, security uplift fees and medical costs.
6. The under recovery reflects less than anticipated income from maintenance works within Roads Construction and within the Parking account where
actual income from Parking charges are less than budget. This is partially offset by an over recovery within Fleet for additional vehicle maintenance
income. 
Budget Virements 
a. Transfer of budget in relation to pay award. Net effect £1.503m: Employees £1.503m.
b. Transfer of budget in respect of additional rates poundage and utilities. Net effect £1.085m: Property £0.175m, Supplies and Services £0.910m.
c. Removal of budget in respect of procurement savings. Net effect (£0.008m): Transport and Plant (£0.008m).
d. Realignment of budget to reflect service provision within Roads and Fleet. Net effect £0.000m: Employees (£0.474m), Property £0.106m, Transport and
Plant £0.656m, Payment to Other Bodies £0.500m, Payment to Contractors £0.509m, Income (£1.297m
e. Transfer from reserves in respect of Community Resilience programme Net Effect £0.035m: Payment to Contractors £0.035m. 
Approved Transfers to Reserves (£0.040m): 
ii. Fleet Sinking Fund contribution (£0.025m)
iii. Year 3 of 4 of Electric Vehicle Payback (£0.015m)
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Head of Finance (Strategy)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April to 1 December 2023
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources’ capital programme of £38.577
million, and expenditure to date of £17.094 million, be noted; and
(2) that the projected outturn of £34.100 million be noted. 
[1recs]
3. Background
3.1. This is the third capital monitoring report presented to the Community and Enterprise
Resources Committee for the financial year 2023/2024. Further reports will follow
throughout the year. 
3.2. The revised budget for Community and Enterprise Resources is £38.577 million.  This
reflects the budget of £39.602 million reported to the last meeting of this Committee in
November 2023, adjusted to reflect changes totalling a net decrease of £1.025 million:
an increase of £0.115 million approved by the Executive Committee on 22 November
2023 (£0.115 million increase) and also proposed a proposed decrease of £1.140
million submitted to the Executive Committee on 24 January 2024.  The details of
these amendments are shown in Appendix A.     
3.3. The Executive Committee (24 January 2024) is also being asked to approve a
separate exception on the Glasgow City Region City Deal – Greenhills Road project
as an exempt paper.  At the time of writing, this has not been reflected in this paper
for commercial reasons. 
3.4. This report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report.  
4
25

Page 26

5. Financial Implications
5.1. 2023/2024 Budget   
The total capital programme for Community and Enterprise Resources is £38.577
million, as detailed in Section 3.2.   
5.2. 2023/2024 Outturn
Work has been ongoing to monitor the predicted spend position for this financial year
and current estimates from Community and Enterprise Resources suggest an outturn
of £34.100 million, an underspend of £4.477 million.  The majority of the variance is
due to the timing of spend on a number of projects resulting in budget required in
2024/2025 rather than 2023/2024.   
5.3. The projects which will now underspend in 2023/2024 include the extension of
Philipshill Cemetery, East Kilbride; Renewal of Play Parks; White Bridge design
(Chatelherault Country Park); Larkhall Leisure Centre design; heating replacement at
TACT Hall, Blantyre; Priory Changing Pavilion, Blantyre; Rural Development Centre,
Lanark; various projects within the Place Based Investment Programme; Cuningar
Allotments; and City Deal Community Growth Area junction improvement project at
Woodfoot Road/Wellhall Road, Hamilton.  Funding for these projects will carry forward
into next financial year.   
5.4. Period 9 Position   
Anticipated spend to date was £17.208 million and spend to 1 December 2023
amounts to £17.094 million, resulting in the Community and Enterprise Resources
being £0.114 million behind programme.  This primarily reflects the timing of project
expenditure on the Roads Carriageway programme, with recharges still to be
processed for works completed to date.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Head of Finance (Strategy) 
David Booth
Executive Director (Community and Enterprise Resources) 
15 January 2024
26

Page 27

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Community and Enterprise Resources Committee, 7 November 2023
 Executive Committee, 22 November 2023
 Executive Committee, 24 January 2024 
List of Background Papers
 Financial ledger to 1 December 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Lorraine O’Hagan, Finance Manager (Strategy)
Ext:  2601 (Tel:  01698 452601)
E-mail:  lorraine.o’hagan@southlanarkshire.gov.uk
27

Page 28

Appendix A 
South Lanarkshire Council
Capital Expenditure 2023/2024
Community and Enterprise Resources Programme
For Period 1 April 2023 – 1 December 2023 
Community and
Enterprise Resources
Base
Budget 
£000
Budget
Adjustments
£000 
Slippage
£000
Total
Budget
£000
Anticipated
Spend
£000
Actual
Expenditure
£000 
Facilities, Waste and
Grounds
2,762 545 - 3,307 962 967 
Enterprise and Sustainable
Development
9,685 2,559 (2,265) 9,979 1,783 1,793 
Roads, Transport and
Fleet
25,763 2,831 (3,303) 25,291 14,463 14,334  
TOTAL  38,210  5,935  (5,568)  38,577  17,208 17,094 
For Information Only
Budget Adjustments approved by Executive Committee, 22 November 2023:  Budget Adjustments approved by Executive Committee, 24 January 2024: 
Budget Adjustments 
Lanark Library, Lindsay Institute, Lanark
Community Bus Fund
Switched on Fleet
Switched on Towns and Cities 
Total Budget Adjustments           
(£0.464m)
£0.303m
£0.250m
£0.026m 
£0.115m
Budget Adjustments 
Calderglen Country Park
SLC Industrial Infrastructure - Energy Efficiency 
Langlands West Strategic Industrial Development Site, East Kilbride
Carluke High Mill Community Facility – Phase 1
Cycle Shelters at Schools
Community Bus Fund
Total Budget Adjustments   
£0.043m
£0.026m
(£0.500m)
(£0.501m)
£0.095m
(£0.303m)
(£1.140m) 
28

Page 29

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Chief Executive
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – September to November 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for September to November 2023 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for September to November 2023
relating to Community and Enterprise Resources be noted:- 
 attendance statistics;
 occupational health;
 accident/incident statistics;
 discipline, grievance and Dignity at Work cases;
 analysis of leavers and exit interviews;
 staffing watch as at 9 September 2023 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Community and
Enterprise Resources provides information on the position for September to
November 2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of November 2023 for
Community and Enterprise Resources. 
The Resource absence figure for November 2023 was 7.3%, this figure has
increased by 1.0% when compared to the previous month and is 1.1% higher than
the Council-wide figure.  Compared to November 2022, the Resource absence figure
has decreased by 0.4%. 
Based on the absence figures at November 2023 and annual trends, the projected
annual average absence for the Resource for 2023/2024 is 6.3%, compared to a
Council-wide average figure of 5.4%.
5
29

Page 30

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 370 referrals were made this period.  This represents a
decrease of 3 when compared with the same period last year.   
4.3. Accident/Incident Statistics 
There were 53 accidents/incidents recorded within the Resource this period, an
increase of 19 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 21 disciplinary hearings were held within the Resource, a
decrease of 8 when compared to the same period last year.  During the period 2
appeals were heard by the Appeals Panel, this figure has decreased by 3 when
compared to the same period last year of which 1 was withdrawn.  One Appeals
Panel was pending, this figure has increased by 1 when compared to the same
period last year.  One grievance hearing was raised within the Resource, this figure
has decreased by 2 when compared to the same period last year.  No Dignity at
Work complaints were raised within the Resource, this figure remains unchanged
when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There were a total of 49 leavers in the Resource this period eligible for an exit
interview. This figure has decreased by 8 when compared with the same period last
year.  Twelve exit interviews were conducted in this period, this figure has increased
by 2 when compared to the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:-
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term post 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period September to November 2023, 107
employees (65.85 FTE) in total left employment.  Managers indicated that 101 posts
(59.85 FTE) were being replaced, 2 posts (2.00 FTE) are being filled on a temporary
basis and 4 posts (4.00 FTE) were due to the end of fixed term contracts. 
5. Staffing Watch 
5.1. There has been no change in the number of employees in post from 10 June 2023 to
9 September 2023. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report.
30

Page 31

7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Chief Executive 
David Booth
Executive Director (Community and Enterprise Resources) 
21 December 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 7 November 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:   (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
31

Page 32

2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
2021 /
2022
2022 /
2023
2023 /
2024
% % % % % % % % % % % %
April 2.3 4.4 3.6 April 5.7 7.3 6.3 April 5.2 6.9 6.0 April 4.3 5.6 5.1
May 2.7 3.9 3.7 May 6.4 6.8 6.3 May 5.9 6.3 5.9 May 4.9 5.4 5.1
June 2.8 3.5 4.3 June 6.6 7.2 5.9 June 6.0 6.7 5.7 June 4.7 5.3 4.7
July 2.9 3.9 2.3 July 5.3 5.9 4.6 July 4.9 5.6 4.3 July 4.0 4.6 3.8
August 2.9 3.4 3.0 August 6.4 6.6 5.2 August 5.9 6.1 4.9 August 4.7 4.4 4.1
September 3.4 3.1 2.5 September 8.2 7.9 7.1 September 7.5 7.1 6.4 September 6.4 5.4 5.3
October 3.8 5.1 2.0 October 7.9 7.5 7.0 October 7.3 7.1 6.3 October 6.3 5.8 5.1
November 3.5 4.2 2.6 November 8.0 8.3 8.1 November 7.3 7.7 7.3 November 6.9 6.5 6.2
December 4.2 3.7 December 8.0 8.8 December 7.4 8.0 December 6.9 7.0
January 3.6 2.6 January 9.6 7.4 January 8.6 6.7 January 7.0 5.8
February 4.4 3.6 February 9.5 7.4 February 8.7 6.9 February 6.6 5.9
March 6.0 3.9 March 11.0 7.9 March 10.2 7.3 March 7.9 6.4
Annual Average 3.5 3.8 3.2 Annual Average 7.7 7.4 6.8 Annual Average 7.1 6.9 6.3 Annual Average 5.9 5.7 5.4
Average Apr-Nov 3.0 3.9 3.0 Average Apr-Nov 6.8 7.2 6.3 Average Apr-Nov 6.3 6.7 5.9 Average Apr-Nov 5.3 5.4 4.9
529 2927 3456 16242
Appendix 1
Absence Trends - 2021/2022, 2022/2023 & 2023/2024
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 30 November 2023 No of Employees at 30 November 2023 No of Employees at 30 November 2023 No of Employees at 30 November 2023
32

Page 33

COMMUNITY AND ENTERPRISE RESOURCES
Sep - Nov Sep - Nov
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 123 106
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 373 370
Sep - Nov Sep - Nov
2022 2023
Over 7 day absences 2 8
Over 3 day absences** 1 0
Minor 18 18
Near Miss 4 11
Violent Incident:  Physical**** 6 12
Violent Incident:  Verbal***** 3 4
Total Accidents/Incidents 34 53
Sep - Nov Sep - Nov
2022 2023
Total Number of Hearings 29 21
Total Number of Appeals 5 2
Appeals Pending 0 1
Time Taken to Convene Hearing September - November 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
17 2 2
Sep - Nov Sep - Nov
2022 2023
Number of Grievances 3 1
Number Resolved at Stage 1 1 0
Number Resolved at Stage 2 2 1
Sep - Nov Sep - Nov
2022 2023
Number of Incidents 0 0
Sep - Nov Sep - Nov
2022 2023
Career Advancement 3 6
Poor Relationship with Manager/Colleagues 0 2
Moving Outwith Area 0 1
Personal Reasons 4 0
Travelling Difficulties 1 0
Childcare/caring responsibilities 1 2
Other 1 1
Number of Exit Interviews conducted 10 12
Total Number of Leavers Eligible for Exit Interview 57 49
Percentage of interviews conducted 18% 24%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
110
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
105
APPENDIX 2
122 148
18 11
33

Page 34

FTE H/C FTE H/C
Terminations/Leavers 65.85 107 181.83 311
Being replaced 59.85 101 171.25 299
Filling on a temporary basis 2.00 2 2.00 2
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 4.00 4 6.58 8
Held pending service Review 0.00 0 2.00 2
Plan to remove for savings 0.00 0 0.00 0
Appendix 2a
Reason Sep - Nov 2023 Cumulative total
34

Page 35

As at 9 September 2023
Total Number of Employees
F/T P/T F/T P/T
1248 260 204 1428
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1535.63 371.38 236.50 44.05 16.00 0.00 5.00 0.00 2213.56
As at 10 June 2023
Total Number of Employees
F/T P/T F/T P/T
1263 250 201 1426
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1548.64 363.88 231.25 46.05 16.00 0.00 5.00 0.00 2215.82
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3140
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3140
MALE FEMALE TOTAL
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resource Plan - Quarter 2
Progress Report 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Community and Enterprise Resource Plan Quarter 2 (Q2) Progress
Report 2023/2024, for the period 1 April to 30 September 2023
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:-
[
(1) that the Community and Enterprise Resource Plan Quarter 2 Progress Report
2023/2024, as summarised in paragraph 5.2 and attached as Appendix 2 of
this report, be noted;
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3 of the report, be noted; and
(3) that it be noted that there are no areas identified for improvement, as detailed
in paragraph 5.4 of the report. 
3. Background
3.1. The Community and Enterprise Resource Plan 2023/2024 was approved by
Community and Enterprise Committee on 10 May 2023 and noted by the Executive
Committee on 21 June 2023 and sets out the outcomes, measures and actions to be
managed and delivered by the Resource for the financial year 2023/2024.   
3.2. The Resource Plan follows the agreed corporate structure and style. The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2023/2024
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2023/2024. These are detailed at Appendix 1. 
5. Quarter 2 Progress Report 2023/2024
5.1. Progress against all Resource Plan measures is contained in the Quarter 2 Progress
Report 2023/2024, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:-
6
37

Page 38

Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report. To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is set out in the table below. There remains
a legacy impact of COVID-19 and the response to it in some areas, and performance
should be considered in that context. 
Status Measures
Statistical Project Total %
Blue 0 1 1      1.8%
Green  9 29 38     67.9%
Amber  5 7 12   21.4%
Red     0 0 0  0%
Report later/Contextual 5 0 5     8.9%
Totals  19 37 56 100%   
(Data correct as at 4 January 2024) 
5.3. Key achievements for 2023/2024, to date, are noted below:- 
5.3.1. 
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
The Council
addresses climate
change by reducing
carbon emissions,
protecting our natural
environment, adapting
to the impacts of
climate change, and
acting sustainably
The Climate Emergency Community Grants fund was re-
launched in April 2023 and has once again proven to be a big
success, with the £75,000 fully committed by the end of June
2023. A full report on the overall impact of the Climate
Emergency Fund, including the community grants, will be
presented to the Climate Change and Sustainability Committee
post March 2024. 
The Council supported the first annual community climate
conference hosted by One Carluke Area Network (ONECAN).
Speakers at the event included former Minister for Environment
Biodiversity and Land reform Mairi McAllan, Heather Ashworth
from Keep Scotland Beautiful and Scene consultants who
presented the community-led Carluke Carbon Emission Report. 
38

Page 39

Connect Outcome  Communities and Environment 
Office for Zero Emissions Vehicles (OZEV) Project consists of
the installation on 13 dual on-street electric vehicle chargers in
various residential streets in South Lanarkshire. These works
have now been completed. 
The Council supports
and promotes a fairer,
healthier, and more
sustainable food
system 
As part of our efforts to identify opportunities to increase food
growing provision throughout South Lanarkshire, planning
permission was applied for a new allotment site at Chatelherault
and planning consent was granted.  Works started in April 2023
and were completed in August 2023.  All the plots have now
been let with the site fully operational. 
High quality streets,
parks and other public
areas ensures South
Lanarkshire is a place
where people want to
live, work, visit and
invest
Strathaven, Castlebank and Cambuslang Parks have
successfully retained Green Flag status in 2023.  Strathaven
Park has won the prestigious award from Keep Scotland
Beautiful for the 11th year in a row, while Cambuslang Park and
Castlebank Park have won for nine and eight consecutive years
respectively. Recognising the very best of our country’s outdoor
areas, the International Green Flag Award acts as a benchmark
for clean, safe and well-maintained parks and green spaces. 
Road and
transportation
infrastructure supports
new development,
enables use of public
transport and
encourages active
travel 
An extensive consultation exercise, involving numerous groups,
organisations, elected members and the public, was undertaken
in July/August 2023 to feed into the development of the new
Local Transport Strategy. The new Strategy will set the future
direction for the Council’s approach to the development and
upkeep of the transport infrastructure and policy within the area.
The Strategy will also set out how the Council will contribute to
the delivery of the obligations set out in the National and
Regional Transport Strategies and other key policy drivers. It is
anticipated that a draft strategy will be presented to committee in
spring 2024. 
Connect Outcome   Our Economy
Resource
Outcome
Achievement
Economic
Development and
growth in South
Lanarkshire is fair,
inclusive, sustainable
and low carbon
A new South Lanarkshire Social Enterprise Strategy was
approved by Executive Committee on 21 June 2023. The
Strategy sets out the Council’s commitment to increase the
number of social enterprises and improve the sustainability of
the sector in South Lanarkshire. 
5.3.2. In addition to working towards these Outcomes, it is recognised that the Council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value.
39

Page 40

Delivering the Plan and achieving Best Value
Resource
Objective
Achievement 
Customers
experience high
quality and
improving council
services 
A new Cemetery Strategy was approved at Community and
Enterprise Resources Committee in May 2023 to allow the service
to take forward and develop new working arrangements within
Bereavement Services. 
5.4. Areas for improvement
There are no areas identified for improvement.   
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
6.2. Absence statistics are monitored and reported through the Council-wide workforce
monitoring report which is presented to Committee and the Employees Issues
Forum. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the Council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2023/2024. 
9. Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
David Booth
Executive Director (Community and Enterprise Resources) 
11 January 2024
40

Page 41

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resources Committee-  29 August 2023   
List of Background Papers
 Council Plan Connect 2022 to 2027 – South Lanarkshire Council, 15 June 2022
 Community and Enterprise Resource Plan 2023/2024 – Community and Enterprise
Resources Committee, 30 May 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Anne Lewis (Performance and Development Officer)
E-mail:  anne.lewis@southlanarkshire.gov.uk
41

Page 42

Appendix 1
Community and Enterprise Resource Outcomes 2023/2024 
Connect Outcomes Resource Outcomes  
Communities and
Environment 
• High-quality streets, parks and other public areas ensures South
Lanarkshire is a place where people want to live, work, visit and invest
• Communities are encouraged and supported to reduce, re-use and
recycle their waste
• The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate
change, and acting sustainably
• The council supports and promotes a fairer, healthier, and more
sustainable food system 
• Communities are well connected 
• All roads, footways, cycle routes, bridges and associated
infrastructure are safe and fit for purpose
• Road and transportation infrastructure supports new development,
enables use of public transport and encourages active travel
• The 20 minute neighbourhood principle is established in our
communities to make our places more sustainable and liveable.
Education and
Learning 
• No resource outcomes for this Connect outcome 
Health and
Wellbeing 
• Public health is safeguarded through an effective environmental
regulation and enforcement service
• All school and nursery children have access to nutritious school meals 
• Health inequalities are addressed through collaboration with local
communities and partners
• All residents have the opportunity to access cultural, leisure and
outdoor recreational activities to help improve their wellbeing and
quality of life
Children and
Young People 
• No resource outcomes for this Connect outcome 
Housing and Land  • Vacant, derelict and contaminated land is brought back into
productive use
• Appropriate supply of housing land (including affordable housing) is
maintained
Our Economy  • South Lanarkshire is an attractive place to start, grow and locate a
business
• Economic development and growth in South Lanarkshire is fair,
inclusive, sustainable and low carbon
• Thriving town and neighbourhood centres provide a focal point for
local communities 
• Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth  
• Consumers and communities are protected through an effective
trading standards service 
Delivering the Plan
and achieving Best
Value
• Customers experience high quality and improving council services
• The council demonstrates high standards of governance and sound
financial stewardship
• The workforce has the skills, flexibility and capacity to deliver the
council’s priorities
• Digital and ICT services meet the needs of the council and its
customers 
42

Page 43

IMPROVe - SLC Performance Management System Report printed on 29 Jan 13:00
Quarter 2 : April 2023 - September 2023
South Lanarkshire Council
Community and Enterprise
Resource Plan
(This represents the cumulative position to September 2023)
Performance Report 2023-24
Appendix 2
6
43

Page 44

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 29 Jan 13:00
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 3 3 0 3 9
Education and Learning 0 0 0 0 0
Health and Wellbeing 3 0 0 0 3
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 3 2 0 2 7
Delivering the plan and achieving best value 0 0 0 0 0
Total 9 5 0 5 19
Page 1
44

Page 45

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of streets found to be
acceptable during Litter Monitoring
Systems Surveys
The Litter Monitoring System (LMS) is a statutory requirement and
involves external validation by Keep Scotland Beautiful. It is reported via
the Local Government Benchmarking Framework (LGBF).
In 2021-22, South Lanarkshire Council continued to score higher than
the Scottish average, with 92.10% of streets surveyed found to be of an
acceptable standard. This is down slightly from 94.05% in 2020-21.
The LMS results for 2022-23 will be reported as part of the LGBF
framework in early 2024. An update will be provided at quarter three.
Report Later 92.10% ------ 94.10% 92.10% ------
Land Audit Management System grounds
maintenance score
The Land Audit Management System (LAMS) score at quarter two was
72.5%, which is above the target of 72%.
Green 72.0 72.5 72.0 71.3 72.0
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of total household waste that is
recycled in 2023
This measure is reported per calendar year and the latest figures relate
to the period from April to June 2023 (48%). The year to date figure
reflects performance from January to June 2023 (44.24%).  This
remains below the target of 50%.
Performance in April to June 2023 (48%) is an improvement on the
same quarter in 2022 (45.08%).
The new bulky waste contract continues to increase the quantities of
bulky waste being recycled. Performance will continue to be closely
monitored.
Amber 50.00% 44.24% 40.50% 41.50% 41.20%
Page 2
45

Page 46

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of household waste sent to
landfill in 2023
This measure is reported per calendar year and the latest figures relate
to the period from April to June 2023. The year to date figure reflects
performance from January to June 2023 (1.45%).  This remains well
below the target to stay under 10%.
Performance in April to June 2023 (1.52%) is slightly more than the
same quarter in 2022 (1.48%).
Green 10.00% 1.45% 9.71% 8.66% 1.84%
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change, and acting
sustainably
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduction in the council’s carbon
emissions achieved by March 2024
(buildings, waste, street lighting, transport)
The Council’s carbon footprint for 2022-23 shows a 20% reduction since
the baseline year 2019-20 (a further reduction of 1.5% compared to
2021-22). The carbon emissions associated with household waste
reduced significantly in 2022, by 52.8%, compared with 2019. This is
partly due the amounts of waste being processed at the Energy from
Waste (EfW) facility. The emissions from energy use in Council buildings
also reduced by 8% in 2022-23 compared with 2019-20.
The significant reduction in 2022-23 is also due to the national carbon
conversions factors for electricity, gas and waste which are lower than
the 2019-20 factors.
Figures for 2023-24 are not yet available.
Report Later ------ ------ ------ ------ 20.0%
Communities are well connected
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of properties with Superfast
Broadband >30Mbps
Progress towards target is slowing with 0.05% increase in quarter two.
Progress is dependent on BT Openreach investment. Alternative
solutions such as Starlink satellite availability may affect this target.
It should be noted that coverage increases in Full Fibre continue at
reasonable levels however investment is dependent on market
conditions.
Amber 99.0% 97.5% 96.6% 97.0% 97.3%
Page 3
46

Page 47

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are well connected
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of properties with Full Fibre
Connection
Investment in Full Fibre connection to households continues within
urban areas with a 2.3% coverage increase in the quarter.
Green 33.0% 34.5% 13.8% 21.9% 32.6%
All roads, footways and bridges and associated infrastructure are safe and fit for purpose
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of our road network that should
be considered for maintenance treatment
This figure is derived from the Society of Chief Officers of Transportation
in Scotland (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target figure of 30.8% is based on the results for the period
2021-23, noting that recent condition figures indicates regression
compared to last year.
Report Later 30.8% ------ 30.6% 29.7% 30.8%
Number of road casualties in South
Lanarkshire during 2023
Provisional casualty figures are available for the first eight months of
2023, when there were 215 casualties. Of these, there were 4 fatal
casualties, 71 serious casualties and 140 slight casualties. There were 0
child fatal casualties, 12 children seriously injured and 14 children
slightly injured.
Compared with the same period in 2022, there were 166 casualties. Of
these, there were 6 fatalities, 50 serious casualties and 110 slight
casualties. For children in 2022, there were 0 child fatal casualties, 2
children seriously injured and  9 children slightly injured.
These are provisional 2023 figures.
Amber 279 215 317 254 279
Page 4
47

Page 48

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
Public health is safeguarded through an effective environmental regulation and enforcement service
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Broad compliance with food law statutory
requirements secured in premises
The rating scheme used to determine broad compliance with food safety
requirements in food businesses operating within South Lanarkshire and
inspected by Environmental Services changed on 1 July 2019. The
previous food law rating scheme focused on broad compliance with food
hygiene requirements only, whereas the new scheme assesses overall
compliance with both food hygiene and food standards legislation.
Under the combined old and new food law rating schemes, 95% of food
businesses that have been inspected were found to be broadly
compliant in the second quarter of 2023-24 (July-Sept 2023). This
equates to 2,648 food businesses.  Year to date, 95% of food
businesses that have been inspected were found to be broadly
compliant with both food hygiene and food standards legislation.
This compliance figure continues to exceed the annual target set for this
measure, and has increased gradually since the new food law rating
scheme has come into affect. This is due to the fact that the new food
law rating scheme allows local authorities to focus resources on high
risk and non-compliant businesses by conducting more frequent
inspections in these establishments.
Green 85.0% 95.0% 90.0% 93.0% 96.0%
All schools and nursery children have access to nutritious school meals
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Level of primary school meal uptake (as a
proportion of total primary school meals
which could be taken up over the period)
Meal uptake is achieving target set. Green 60.0% 66.2% 41.3% 58.2% 66.0%
Level of secondary school meal uptake (as
a proportion of total primary school meals
which could be taken up over the period)
Meal uptake is achieving target set. Green 38.0% 38.4% 24.4% 36.3% 38.0%
Page 5
48

Page 49

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of new South Lanarkshire
business starts supported by Business
Gateway
This figure includes performance up to August only.  Half way target of
250 has not been achieved and the number of starts ups has been
behind each month of 2023 and this is largely due to changes in staffing
at the contractor, where staff have retired and left to take up new
positions.  Whilst new staff have been recruited it takes time for them to
get up to speed.  The contractor is confident that the target will be
achieved over the year and there is an improvement plan in place which
reflects this.
Amber 500 123 ------ ------ 520
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
Slightly behind the halfway point of 600 on the annual target as the
UKSPF programmes have not been opened for the full 6 months period.
However, there is a strong pipeline and we should be able to achieve
the full annual target.
Green 1,200 376 3,075 2,679 1,615
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
Exceeded half way target of 250 in the first 6 months. On target to
achieve for full year.
Green 500 380 ------ 1,095 1,256
Increased value of sales generated by
businesses as a direct result of Economic
Development intervention
Exceeded half way target of £2.5M in the first 6 months. On target to
achieve for full year.
Green £5.000m £4.589m ------ £22.107m £13.113m
Perecentage of procurement spend on
local enterprises
This is a local government benchmarking framework indicator. 2021-22
information was published in January 2023, and showed that the
percentage of spend on local enterprises increased from 16.99% in
2020-21 to 18.21% in 2021-22.  However, this remained below the
Scottish average of 29.88%, and placed South Lanarkshire in 28th place
out of all the authorities.
In support of the Community Wealth Building Strategy, officers continue
to analyse expenditure in order to better understand the geographical
profile of our core trade expenditure within South Lanarkshire, across
Lanarkshire as a whole, Glasgow City Region and Scotland.
The figure for 2022-23 will be reported as part of the LGBF framework in
early 2024 and will be updated at quarter three.
Report Later ------ ------ 0 18 0
Page 6
49

Page 50

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 29 January 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Delivery of UK Shared Prosperity Program Delivery is progressing. The six monthly report is being prepared and will
be submitted to Glasgow City Region on 9 October 2023.
Report Later £3.000m ------ £0.000m £0.000m £0.000m
Physical development and land use in the area is enabled, guided and controlled to help facilitate economic growth
Performance Indicators Comments/ Progress Status 2021/22 2022/232020/21Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of all planning applications
approved
A slight increase in refusals has resulted from a review of ‘legacy’
planning applications. Clearing the backlog of applications which had
stalled due to the lack of progress on legal agreements or applicants not
submitting information while leading to this increase should deliver
improved performance against this indictor in the future.
Amber 95.0% 91.2% 96.2% 97.1% 97.6%
Page 7
50

Page 51

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 1 12 3 0 0 16
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 5 2 0 0 7
Children and Young People 0 0 0 0 0 0
Housing and Land 0 1 0 0 0 1
Our Economy 0 11 2 0 0 13
Delivering the plan and achieving best value 0 0 0 0 0 0
Total 1 29 7 0 0 37
Page 8
51

Page 52

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Action Measures Comments/ Progress Status
Prepare an Open Space
Strategy in partnership
with Glasgow and Clyde
Valley Green Network
Partnership and other
council services.
Strategy will contain
standards on access to
and quality of open
spaces
Draft Open Space strategy to be presented to the Planning
Committee by March 2024
Consultants appointed and initial data gathering commenced. Green
To make South
Lanarkshire a cleaner
place to live, work and
visit free of litter, fly
tipping and dog waste
Prepare an annual progress report for Climate Change and
Sustainability Committee in September 2023, demonstrating
the impact of the Litter Strategy (2022-2027)
The annual progress report for the Litter Strategy was presented to
committee on 20 September 2023.
Complete
Communities are encouraged and supported to reduce, re-use and recycle their waste
Action Measures Comments/ Progress Status
Support a circular
economy by re-using,
recycling and generating
energy from the waste
we manage
Commence a review of the waste service during 2023-24
that will incorporate the impact of the Deposit Return
Scheme
The Waste Review is ongoing and is on target for completion within
the agreed timescales. Phase 1 - Household Waste Recycling Centre
(HWRC) sites is complete and the new contract for the management
and operation of HWRCs is currently being evaluated. In terms of the
other Phases (Infrastructure and Kerbside Collection Services),
several key pieces of work have already been completed including a
Waste Compositional Analysis.
Green
Page 9
52

Page 53

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,
and acting sustainably
Action Measures Comments/ Progress Status
Lead by example and
influence area-wide
climate change and
sustainability action
Implement the Sustainable Development and Climate
change Strategy (2022-2027) Action Plan, and report
progress at quarter two and quarter four to Climate Change
and Sustainability Committee
Quarter four progress was reported to the Climate Change and
Sustainability Committee on 20 September 2023.
The Action Plan for 2023-2024 has been agreed with services and
been created on IMPROVe. The first update is due in October for
Quarter two. Emails asking for updates going out on 9 October 2023.
Quarter two progress will be reported to the Climate Change and
Sustainability Committee in February 2024.
Green
Protect, enhance and
respect South
Lanarkshire's natural
environment
Develop a new Biodiversity Strategy (2024-2030) and
Biodiversity Implementation Plan for (2024-2026) for
approval by Climate Change and Sustainability Committee
by February 2024
Both documents are currently being drafted. Green
Ensure national
planning policy set out in
National Planning
Framework 4 in relation
to climate change,
biodiversity and
sustainable travel is
Prepare Supporting Planning Guidance on climate change &
sustainability and green issues as an interim measure
pending preparation of LDP3
Supporting Planning guidance and Policy documents will be reported
to the relevant Committees during 2024.
Amber
embedded in decision
making process for
planning applications
and the preparation of
the South Lanarkshire
Local Development Plan
3
Awareness sessions to be developed for elected members,
planning officers and developers/agents by September 2023.
Reports to Committees will continue to be presented through 2024,
while awareness sessions with Members, Communities and the
development industry will be held within the context of the engagement
for the Local Development Plan.
Amber
Page 10
53

Page 54

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,
and acting sustainably
Action Measures Comments/ Progress Status
Create the conditions for
the decarbonisation of
the council's fleet
Implement and review the Fleet Strategy (2020-2025) Action
Plan including a reduction in transport related emissions,
conversion of fossil fuelled small fleet to full electric and the
trailling of a new fuel option for the medium to heavy fleet
The Fleet Asset Management Plan 2022-23 has been completed, and
will be presented to the Community and Enterprise Resource
Management Team.  It has been copied to Housing and Technical
Resources for inclusion in the Corporate Asset Management Plan.
The Fleet Asset Management Plan provides an update in relation to
progress against the actions contained in the Fleet Strategy (2020-25).
It is recognised that the two years lost to the Covid-19 pandemic have
impacted the extent of progress that might have otherwise been made.
Green
Deliver new and
improved low carbon
vehicle charging
infrastructure
Maintain, manage and expand public infrastructure points /
hubs in line with available internal and external funding
sources
Office for Zero Emissions Vehicles (OZEV) Project.
This project consists of the installation of 13 dual on-street electric
vehicle chargers in various residential streets in South Lanarkshire.
Works are now complete.
Electric Vehicle Charging Infrastructure
Glasgow City Council, in conjunction with other City Region Local
Authorities, including South Lanarkshire, commissioned a consultant
to complete an EV Strategy and Plan. Market engagement is
underway and options being considered on a regional basis for
expansion.
Green
Page 11
54

Page 55

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council supports and promotes a fairer, healthier, and more sustainable food system
Action Measures Comments/ Progress Status
Develop a sustainable
food system to
overcome social, health,
economic and
environmental issues
related to food
Implement the Good Food Strategy (2020-2025) Action Plan
and report progres at quarter two and quarter four to the
Climate Change and Sustainability Committee
The year four of the Good Food Strategy Action Plan (2023/2024) was
approved by the Climate Change and Sustainability Committee on 20
September 2023. The quarter two report showing progress on the
implementation of the strategy will be presented at the Climate Change
and Sustainability Committee on 29 November 2023.
Green
Continue to identify
opportunities to increase
food growing provision
throughout South
Lanarkshire
Progress planning application and process for new site at
Chatelherault, and if successful, begin development of the
site and allocating plots from the waiting list by March 2024
Planning consent for the new site at Chatelherault was granted and
works started April 2023 with completion August 2023.  All plots are
now let with the site fully operational.
Green
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Deliver prioritised road
safey infrastructure
improvements and
promote road safety
Deliver road safety projects and schemes in line with agreed
2023-24 programme
Casualty reduction measures are being introduced at the following
locations:
A749, East Kilbride Road - new warning signage and road markings.
Bloomgate/Westport Lanark - pedestrian refuge island and new town
gateway pinch point.
A73 Braidwood - new signs/road markings.
A73 - Bogside to Carluke - alterations to junctions at Wildman Road
and Law Hospital.
A72 Palace Grounds Road - application of high friction surfacing at
pedestrian crossing.
A73 - application of high friction surfacing north of Hyndford Bridge.
General signing, lining and catseye improvements on A721, A70 and
A706.
Green
Page 12
55

Page 56

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Improve resilience of
strategic routes during
adverse weather
Implement prioritised / enhanced drainage / gulley cleaning
action plan across the network by June 2023
During financial year 2023-24 additional resources have been
allocated to increase gully cleaning capacity. This will allow the service
to address a backlog in gully cleaning as well as direct resources to
clearing other key areas of our drainage infrastructure. More detail will
be provided in the quarter three update.
Green
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Produce a new Local
Transport Strategy for
South Lanarkshire to
support the National and
Regional Transport
Strategy as well as the
provisions, where
appropriate, of the
Transport Scotland Act
Draft Local Transport Strategy to be presented to Committee
by Spring 2024
A consultant to undertake the development of the next Local Transport
Strategy has been appointed. An extensive consultation exercise was
undertaken in July/August with numerous groups, organisations,
elected members and the public invited to contribute views. We are
currently reviewing the feedback to enable relevant policies and
actions to be developed. It is anticipated that a draft document will be
presented to committee in Spring 2024.
Green
Page 13
56

Page 57

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Provide road and
infrastructure
improvements to
support new
developments including
those undertaken as
part of the City Deal
An Outline Business Case will be prepared for the
Stewartfield Way Sustainable Transport Capacity
Enhancement Project in Autumn 2023
Work on the outline business case is progressing.  Additional
modelling work is being carried out at the James Hamilton Loch
roundabout at the A726 / GSO roundabout.  Discussions are on-going
with Transport Scotland and the retail park at Kingsgate. Project
continues to be refined and a review of timelines is underway.
Amber
Page 14
57

Page 58

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Encourage active travel
by extending our
network of walking and
cycling routes
Deliver walking and cycling projects/schemes in line with
agreed 2023-24 capital programme
A number of cycling and walking projects are progressing: -
1) Active Travel Studies – A number of further studies have been
completed for towns such as Blackwood, Kirkmuirhill, Abington,
Crawford, Carnwath, Forth and Biggar.  These are currently being
reviewed and once approved these will complete studies for all areas
of South Lanarkshire and will be uploaded onto the Council’s website.
The priorities identified in these studies will be reviewed as part of the
development of the new Local Transport Strategy.
2) East Kilbride Cycle Network – The next phase of the development
of a segregated cycle network with enhanced pedestrian facilities in
East Kilbride has commenced on Churchill Avenue.  This will link West
Mains Road to Cornwall Street and towards the trunk road network on
the A726.  This work is 90% complete and it is anticipated that works
will be completed in November.
3) Carstairs to Carluke – Works which include surfacing upgrades,
shared cycle /pedestrian crossing points of the A706 and A70, signing,
road markings and other associated works are 80% complete and and
transfer of land ownership to allow for the final section to be
constructed is programmed.
4) Cycle Parking Provision in Town Centres – Locations for new
shelters have been identified with associated consultation and works
programmed for later this year.
5) Cycle Shelters and parking stands in schools – Locations for new
shelters have been identified and funding has been awarded by
Sustrans.
6) Cycle Route designs continue being taken forward in various
locations such as Carstairs, Hamilton, Uddingston and Bothwell.
Green
Page 15
58

Page 59

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All school and nursery children have access to nutritious school meals
Action Measures Comments/ Progress Status
Complete the roll out of
free school meals to all
primary children
All P6s and P7s to receive free school meals in line with
Scottish Government timescales
The Scottish Government has taken the decision to move the
implementation date to August 2024 to allow further information to be
gathered before releasing funds. Work is ongoing to prepare for the
roll out.
Amber
Health inequalities are addressed through collaboration with local communities and partners
Action Measures Comments/ Progress Status
Complete the Shaping
Places for Wellbeing
project in Rutherglen
Use the data analysis conducted during 2022-23 to develop
actions to address health inequalities, taking account of the
existing infrastructure available in the form of codesigned
solutions, by October 2023
The project is led by the Improvement Service and partners include
NHSL and Clyde Gateway as well as several services within the
Council.  The officer working group is developing an all sector action
plan to be delivered by partners with a revised timescale for
completion of March 2024.
Amber
Present regular update reports to the Corporate
Management Team, with a final outcome report being
delivered by March 2024
Updates reported to CMT as appropriate. Green
Page 16
59

Page 60

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All residents have the opportunity to access cultural, leisure and outdoor recreational activities to help improve their wellbeing and quality of life
Action Measures Comments/ Progress Status
Develop a
Commissioning Plan to
define the council’s ask
of South Lanarkshire
Leisure and Culture
(SLLC)
Develop a Commissioning Plan for approval by Executive
Committee
An initial session was held with Elected Members on 19 June 2023 to
provide contextual information to support the development of a new
Commissioning Plan for SLLC. The Commissioning Plan is intended
set out a clear strategic framework for the provision of leisure and
culture activities in South Lanarkshire.
A survey was developed for completion by Members over the summer
period, with a follow up session in September 2023.
Green
Improve health and
wellbeing by offering
attractive and affordable
leisure and cultural
activities delivered with
warmth, friendliness and
individual pride (SLLC
Mission)
Implement the South Lanarkshire Leisure and Culture
Strategy (2022-2027), monitor impact on a quarterly basis via
the four SLLC Strategy Implementation Groups, and report
on progress twice per year to the Community and Enterprise
Resources Committee
The performance management framework to support the strategy is
currently being finalised. The initial progress report will be presented to
Community and Enterprise Resources Committee in February 2024.
Green
Begin implementation of
the multi-year Play Area
Investment Programme
Undertake consultation with local members and communities
in Larkhall, Cambuslang and Rutherglen
Consultation has been undertaken with Larkhall elected members and
schools consultation has been programmed for week commencing 2
October for all primary schools in Larkhall.
Invitations have been sent out to Rutherglen/Cambuslang elected
members, with local consultation following thereafter.
Green
Finalise design options and implement agreed proposals by
March 2024
Design options for Larkhall will be completed early October once
schools consultation events have taken place, with initial design
proposals presented to Rutherglen/Cambuslang elected members late
October 2023.
Green
Page 17
60

Page 61

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Housing and Land
Vacant, derelict and contaminated land is brough back into productive use
Action Measures Comments/ Progress Status
Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the Vacant and Derelict
Land Fund framework agreed for 2023-24
Clyde Gateway project to upgrade access road and extend car park at
Cuningar Phases 2 and 3 completed.  Cuningar allotments project out
to tender.  Vacant Derelict Land Fund programme for 2023-24
approved at Community and Enterprise Committee.
Green
Page 18
61

Page 62

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate,
whilst creating the right
conditions for low
carbon economic growth
Deliver programmes, services, and events to businesses
around sectors, location, and themes (e.g., food and drink,
tourism, construction, low carbon, innovation,
internationalisation, collaboration, and young enterprise)
Young Enterprise - we have liaised with Elevator in the development of
new events.
VisitLanarkshire’s seasonal marketing campaign for Spring 2023 took
place over April 2023. A similar campaign for Autumn 2023 will go live
next month.
We attended VisitScotland Connect in April to present Lanarkshire to
the travel trade and create leads for travel trade ready businesses
across the area. We supported New Lanark enabling them to attend
the event and have received positive feedback. We have begun plans
to offer this support again in 2024.
We have agreement with VisitScotland for us to support agritourism
businesses to become quality assured using funds at VisitScotland.
Work is being commissioned with Green Tourism to provide a
programme of support and resources to support tourism businesses
across Lanarkshire on sustainability.
We are working with AccessAble to support the promotion of
accessibility across our tourism businesses.
Planning is underway to run winter promotional campaigns for South
Lanarkshire.
Tourism officer carried out a talk for travel and tourism students and
further support is planned to increase  travel and tourism related
university courses.
Tourism grant fund planned with Shared Prosperity Funding which will
assist tourism businesses to promote their business and the wider
area to tourists.
Green
Page 19
62

Page 63

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
Manage the Supplier Development Programme to deliver
events, training and e-commerce support to SME’s or third
sector organisations who are interested in working with the
public sector
South Lanarkshire Council continue to host the programme team who
are delivering a range of events and webinars for councils and other
partner organisations across Scotland.
Green
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Review the remit,
membership and
effectiveness of the
existing Lanarkshire
Economic Forum, and if
required,
refocus/restructure in
Review the original scope and membership of the
Lanarkshire Economic Forum, together with the outputs of
the Forum since establishment in 2020
Review of the Lanarkshire Economic Forum is underway.  It's
future/remit is also being considered as part of the future delivery
arrangements for Business Gateway.
Green
order for it to act as the
Economic
Transformation Board to
drive forward the South
Lanarkshire Economic
Strategy
Dependent on the outcomes of the review,
refocus/restructure the forum in consultation with the partner
organisations
This is linked to the review and will be considered in due course. Green
Promote sustainable
economic development
across South
Lanarkshire
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of the South Lanarkshire Economic Strategy (2022-2027)
The strategy has been adopted by the Executive Committee and
update report will be taken to committee in spring 2024.
Green
Page 20
63

Page 64

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Positively enhance the
benefits of tourism
across South
Lanarkshire by
delivering the very best
for our visitors, our
businesses, our people,
our communities, and
our environment
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of South Lanarkshire Tourism Strategy (2022-2025)
The strategy has been approved by the Community and Enterprise
Committee and an update report will be taken to committee in
February 2024.
Green
Champion the social
enterprise sector and
invest in start-up and
growth of our local
social enterprise
Develop a new Social Enterprise Strategy for approval by
Community and Enterprise Resources Committee in May
2023
The South Lanarkshire Social Enterprise Strategy 2023-2027 was
approved by the Council's Executive Committee on 21 June 2023.
The three high level priorities of the Strategy are: stimulating social
enterprise; developing stronger organisations; and realising market
opportunity.
Green
Income generating
projects will be scoped
across all council
resources to identify
viable projects with a
focus on green
initiatives including
exploring options for
delivery and funding
Liaise with all council resources, third parties and funders to
identify new opportunities for generating income and
consider a risk analysis of each opportunity
This area of activity is ongoing and will be reported to Executive
Committee on 24 January 2024.
Green
Page 21
64

Page 65

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Consult with community
organisations and
develop a Rural Action
Plan maximising existing
and future funding
through Community Led
Local Development and
Renewable Energy
Fund
Finalise the Rural Action Plan and report to Rural Task Force
in November 2023
A seminar proposing new priorities and changes to the REF was given
to the Rural Task Force on 2nd October 2023. These will be developed
into a full paper for the November meeting of the Task Force and will
then move on to committee for approval.
Green
Thriving town and neighbourhood centres provide a focal point for local communities
Action Measures Comments/ Progress Status
Complete the south
Lanarkshire wide town
centre visioning strategy
which will give a
strategic overview on
the engagement and
interventions with town
centres over the next 10
years, and a series of
town specific strategies
and action plans will sit
below this, giving a
template for
placemaking within our
communities.
Complete draft town centre visioning study by end June 2023
for consultation, and present final visioning strategy to
Community and Enterprise Resources Committee in
November 2023
Draft study complete and decision on next steps and reporting being
discussed.
Green
Page 22
65

Page 66

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 29 January 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Physical development and land use in the area is enabled, guided and controlled to help facilitate economic growth
Action Measures Comments/ Progress Status
Preparation of revised
Residential Design
Guide
Develop interim framework for consultation with
stakeholders, with final framework prepared by end of June
2023
LDP3 Engagement strategy will be finalised in quarter three with a
view to rolling out at the start of 2024.
Amber
Present finalised document to Planning Committee for
approval by December 2023
Progress on the Residential Design Guide has been delayed in order
to reflect emerging themes and the need to incorporate wider
placemaking principles.  It is now anticipated a draft document will be
presented to Planning Committee in quarter one 2024-25.
Amber
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Implement the Frontline
First Fund
Identify and implement a programme of projects to deliver
the Frontline First Fund
A range of works have been identified along with a spend profile for
this year. Implementation work will begin over the Autumn and Winter
period.
Green
Page 23
66

Page 67

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Renewable Energy Fund - Strengthening Links to Rural
Priorities 
1. Purpose of Report
1.1. The purpose of the paper is to:-
[purpose]
 outline proposed changes to the Renewable Energy Fund (REF)
[1purpose]
2. Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s):- 
(1) that the key challenges for the rural area, as identified in paragraph 4.6, be
noted; and
(2) that the proposed amendments to the REF criteria, as set out in paragraph 4.7,
be endorsed and referred to the Executive Committee for approval. 
3. Background
3.1. Since 2004, the Council has collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing contributions from windfarm developers, advising potential
applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities. 
3.2. The Council administers the Community Benefit element of REF for 42 windfarms
within South Lanarkshire and the Community Benefit for Clyde Windfarm Fund
(CWFF). Between the various funds £3,111,584 income was received in 2022/2023
which was split between REF (£2,020,682) and CWFF (£1,090,902).   
3.3. The funds are currently administered covering a range of programmes listed below:- 
 Community Microgrants to every community council
 RISE employability programme
 Connect2Renewables employability programme
 REF 100% grant funding for capital spend below £10,000
 REF grants for capital spend above £10,000 
3.4. As an indication of the scale over the last 15 years, £10 million has been awarded and
invested within communities closest to the windfarms with each £1 of grant generating
on average £3 of additional funding. Over the 15 years, a total of over 500 grants have
been awarded and of these over 110 have been grants of over £20,000. 
7
67

Page 68

3.5. The REF’s overall themes were reviewed and refreshed in 2019 and complement
Council and community plans. The themes are listed below, and the detailed priorities
are contained in Appendix 2:- 
 build stronger communities
 build prosperous communities
 develop healthy and active communities
 create sustainable and environmental communities. 
3.6. The themes and priorities are broad and were drawn from previous community
capacity funding programmes, such as LEADER.  They support a wide range of
community needs and projects, however, REF only supports capital projects, and this
limits the range of projects seeking grant funding. 
3.7. The number of windfarms, scale and community benefit income generated is
increasing.  The income has approximately doubled in 5 years to an estimated £2.5
million in 2023/2024. This allows a review on how the funds can best support local
communities and the strategic outcomes from the funds. 
4. Review of Community Benefit
4.1. There are several reasons to review the Community Benefit funds at this time and
these are summarised below:- 
 20 years since the creation of the REF
 increasing value of the funds within certain communities
 lack of corresponding increase in the number of community led applications
 difficulty for communities to develop larger impactful projects
 perceived lack of scale and strategic impact of funds
 perceived lack of long-term impact of funds for communities 
4.2. The annual income from windfarm community benefits varies between communities
and within wards dependent on scale and proximity of windfarms but is concentrated
on 6 rural wards which form the Rural Task Force. Some wards within Larkhall and
East Kilbride also have access to apply to REF.  All wards within the Council area are
eligible for microgrants. The table below summarises the annual income available for
rural wards and selected communities at the higher and lower range:- 
Ward Lower annual REF Income  Higher annual REF Income 
Ward 1 Law                                £200k Crossford/ Carluke        £310k
Ward 2 Braehead                       £200k Forth                              £330k
Ward 3  Carmichael                     £    0k    Carstairs                        £300k
Ward 4 Auchenheath                  £500k Douglas                         £1m
Ward 5 Auldhouse                      £200k  Strathaven                     £900k
Ward 20 Larkhall (Raploch)          £  20k  Ashgill                            £200k 
4.3. In addition, some communities in Wards 3 and 4 are also eligible for funding from the
Clyde Windfarm administered by the Council of approximately £1 million per annum,
however, eligibility and funding decisions are made by a community panel and advised
by SSE Renewables.  The proposed REF changes do not extend to the Clyde
Windfarm.  
4.4. Following engagement with local communities through events such as the rural
conference, it is considered there are 4 aspects that could be limiting the impact of the
Fund:-  
68

Page 69

 Strategic focus on rural community priorities and challenges.
 Limitation to capital only projects prevent longer term projects being delivered.
For example, a project to support energy efficiency in a community could only
support infrastructure to public buildings but not provide advice and support to
residents or businesses.
 Scale of grants available and match funding requirements.
 Organisational capacity within the area, to deliver impactful projects and
programmes, relying on volunteers, limits the speed and development of more
complex projects.   
4.5. While the funds currently provide significant local community benefit, with the scale of
the funds increasing and with these funds guaranteed for the next 15 to 25 years, there
is a need to agree the challenges that the Fund should address. These challenges
consistently arise in rural consultation events such as the Community Planning
Partnership (CPP) group and in community action plans, however, often these
challenges require joined up strategic action, which is difficult for single communities
to deliver. It is, therefore, considered appropriate to agree a range of rural challenges
the fund will seek to address and have a long-term impact on.   
4.6. Through the work of the rural Community Led Local Development Programme (CLLD)
funded by Scottish Government, and community engagement such as the Rural
Conference in March 2023, several strategic challenges were identified which are not
currently fully addressed via REF. These priorities are listed below in order of
importance: 
1.) transport and connectivity
2.) recreation and community facilities
3.) rural entrepreneurial activities and business infrastructure
4.) jobs, training and employability
5.) environmental and net zero sustainability
6.) rural poverty and wellbeing
7.) tourist and visitor infrastructure to support tourism 
4.7.  It is proposed that the criteria for REF grants is amended to align and deliver on the
challenges and to increase the benefit for communities.  The proposed amendments
are:- 
 An ability to fund revenue projects for up to 3 years in addition to capital projects. 
 Increase the small grants level to 100% funding up to £20k.
 Increase the large grant maximum to 75% and in specific areas and with
conditions up to 100% grants would be available.
 Introduce a Rural Facilities Sustainability Fund to help communities consider
asset ownership and retain facilities for a period of up to 3 years.
 In consultation with communities, Community and Enterprise Resources will
develop larger more complex community projects on behalf of local communities
and local needs focusing around the strategic challenges.   
4.8. Further detail and a comparison of the changes to the current position is included
within the Appendix 1. 
4.9. These changes have been developed following consultation with the Council’s Rural
Task Force and were taken to the Rural Task Force on 15 November 2023 for noting.
The proposals have also been discussed at the rural CPP group and the third sector
interface with broad approving of the changes.   
4.10. Consultation with windfarm operators has been undertaken with broad approval of the
changes. 
69

Page 70

4.11. If endorsed, the proposed changes will be referred to the next appropriate meeting of
the Executive Committee for approval.  Application decisions under the revised criteria
being effective thereafter. 
5. Employee Implications
5.1. Some of the windfarms allow for development officers to be part funded through the
Fund.  This has been used within the Douglas Valley area to support the community
with the Hagshaw Hill Framework using Douglas West Windfarm Community Funds.
This approach can be considered in other instances to support development of grants
and strategically important initiatives developed/delivered by the Council. 
6. Financial Implications
6.1. Changes to the Fund criteria may allow for the support of local facilities and initiatives
and potentially bring additional match funding and assist the overall revenue and
capital budget pressures for rural leisure facilities. The changes will allow communities
more scope to develop local initiatives and projects while reducing the Council’s
involvement and funding.   
7. Climate Change, Sustainability and Environmental Implications
7.1. One of the Themes of the Fund is Creating Sustainable and Environmental
Communities.  Environmental and net zero sustainability is also recognised as a
challenge which will allow an increased focus of the funds on the area of Climate
Change and Sustainability. 
8. Other Implications
8.1. Not amending the criteria is likely to result in the Fund not being fully committed and
not addressing the need and challenges of the communities potential leading to
operators withholding funds or seeking to introduce changes of their own.   
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report updates the criteria for REF but does not introduce a new policy, function
or strategy and, therefore, no Impact Assessment is required. 
9.2. Consultation was undertaken with the Rural Task Force, local communities and
windfarm operators.   
David Booth
Executive Director (Community and Enterprise Resources) 
22 December 2023 
70

Page 71

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Executive Committee,  31 March 2004, Community Benefit: Establishment of a
Renewable Energy Fund
 Executive Committee, 1 December 2010, Renewable Energy Developments and
Community Benefit
 Community and Enterprise Resources Committee, 30 October 2018, Renewable Energy
Fund Community Benefit Fund Proposed Update and Amendments
 Executive Committee, 21 November 2018. Recommendations Referred by Resource
Committees 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kenny Lean
Economic Development Manager (Funding and Rural), Enterprise and Sustainability
Services
Tel: 07469027925
E-mail: Kenny.lean@southlanarkshire.gov.uk 
71

Page 72

Appendix 1
Renewable Energy Fund Proposed Changes
SUMMARY OF CHANGES 
EXISTING REF PROPOSED REF 
Small Grants  100% grants up to £10k  100% grants up to £20k 
Large Grants  Above £10k maximum of
65% grant 
Above £20k grants approved
at committee   
Above £20k maximum of 75%
grant 
100% grants available in high
fund areas 
4 – 5 publicised funding
rounds per year 
Above £20k grants approved
at committee (no Change) 
Revenue Funding  Not available  Up to 3 years funding for
projects 
Rural Facilities
Sustainability
Fund 
Not Available  Revenue + emergency capital
funding with funding for
development and feasibility
costs for up to 3 years. 
Council Led
Initiatives 
Connect2Renewables
Employability 
Pilot project to be explored for
a rural community transport
initiative.  Other opportunities
also to be explored. 
Projects will go to committee
for approval. 
72

Page 73

Further Detail
Small Grants  
Increase the small grants of up to £10k at 100% grants to £20k. 
Large Grants
Large grants of over £20k available at up to 75% grants available in most REF areas. 
Five funding rounds per year for grants above £20k which will coincide with Community and
Enterprise Resources Committee meetings. 
100% grants available in areas where there are two REF windfarms contributing over £100k
per year into the REF, currently these are Middlemuir, Kypemuir, Blacklaw,  Galawhistle,
Whitelees, Douglas West, Andershaw, Auchrobert, Dalquandy, Calderwater, West
Browncastle. 
This will cover the following villages of, Abington, Auchenheath, Auldhouse, Blackwood,
Brocketsbrae, Coalburn, Chapelton, Crawfordjohn, Douglas, Drumclog, Glespin, Kirkmuirhill,
Lesmahagow, Rigside, Stonehouse, Strathaven and the South area of East Kilbride,
(Whitehill, Greenhills, Crosshouse). 
At all times match funding is encouraged. Above £20k, 100% grants are the exception but
are available when strong projects are unable to secure match funding. 
Revenue Costs 
Restricted Funding can only be used for a specific project with full cost recovery. Revenue
funding including running costs such as salaries, heating, lighting, administration,
consumables and small items of equipment to deliver projects that meet local and REF
priorities. 
Funding for up to 3 years. 
Projects must:- 
• Show strong alignment with REF priorities 
• Demonstrate clear outcomes representing value for money
• Deliver against local community action plans if they are present.
• Job description required for any posts being funded 
Rural Facilities Sustainability Fund
Scope 
A priority set up within the REF to support rural communities through change in community
leisure and facility provision, initially for up to 3 years. 
Open to constituted and non-constituted organisations (the later dependent on further
conditions). 
Available in REF areas where funds are available for each windfarm fund and community.
Areas with limited funding would be on a first enquiry basis. 
Open to support retaining any community facility at clear risk of or identified for closure. For
example, South Lanarkshire Leisure and Culture (SLLC) sports centre, halls, library, church
halls or bowling green.
73

Page 74

Primarily revenue funding for 36 months and can contribute to small scale urgent capital costs
to keep a facility open. 
Could fund the projected/actual deficit, (running costs heating, staff etc less any income). 
Would also fund support on community consultation, structural surveys, legal, option
appraisal, business planning. (These are all currently fundable through REF so not
additional).   
Purpose
To allow communities up to 3 years to consider, evaluate the communities needs and
Community Asset Transfer models and options on facilities with imminent closure risk. 
Would provide a tailored solution and package of support and funding for the rural area. 
Potential stages.
Available following Executive Committee approval. 
Fast track for sustainability funds to keep property open. 
Enquiry submitted from a group linked to a property at risk. 
If on closure list or considered at risk moved to application stage. 
If SLLC property running and deficit costs provided from SLLC spreadsheet to the group.
Other evidence of deficit costs would be required for other properties. 
Application submitted with these costs. 
Fast track Internal panel assessed for applications below £20k, above £20k would go to
Community and Enterprise Resources Committee as other grants would.   
Approved or rejected and guidance provided. 
Approval would open option to seek further funding for community consultation and
consultancy 2nd application commenced and costs established. 
74

Page 75

APPENDIX 2
Themes and investment priorities
• All projects should meet at least one of the four Themes and projects meeting the
following investment priorities will score higher in assessment.
Theme one: Stronger Communities
• Investment priorities
• Support for communities to consider their own priorities at a community level
and deliver projects that address these priorities.
• Support for projects that seek to address fuel poverty, financial poverty or
access to services.  
• Support to improve mobility for rural residents.
• Support for projects aimed at older and younger residents of remoter rural
communities.
• Support to assist communities take on local community owned and/or
managed assets.
Theme two: Prosperous Communities 
• Investment priorities
• Support for targeted engagement in training, education and employment
initiatives. 
• Support for projects that aim to improve the vitality and viability of rural town
and village centres. 
• Support for growing the SME infrastructure and environment through improved
business infrastructure and services but not direct to individual businesses. 
• Support to locally focused social enterprises and not for profit organisations
which aims to increase profitability and numbers employed. 
• Support for tourism infrastructure, attracting visitors and or employment.  
Theme three: Healthy Active Communities 
• Investment priorities
• Support for projects that help healthy and active life styles including sports,
recreation and leisure.
75

Page 76

• Support for projects that aim to maintain independence for older people and
disadvantaged groups.
• Support for the relief by reason of age, ill health disability financial hardship
or other disadvantage. 
Theme four: Sustainable Environmental Communities 
• Investment priorities
• Support to protect and enhance the area’s natural and cultural heritage assets
including increasing awareness of the asset.  
• To promote and encourage environmental enhancements including the
provision or upgrade of infrastructure.
• Support for projects which aim to improve energy efficiency, reduce carbon
emissions, develop sustainable transport, climate change mitigation and
increase community growing. 
76

Page 77

Report
Agenda Item 
Report to: Community and Enterprise Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds Middle Muir -
Connect2Renewables Programme Extension 
1. Purpose of Report
1.1. The purpose of the report is to:-
[
 seek approval for the community benefit from Middle Muir Windfarm to continue to
support the Connect2Renewables employability programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that it be approved that the funding support for the Connect2Renewables
Programme be extended for a further 5-year period to 2028 and that the
contribution to the programme be increased to a maximum of £174,453.  
[1recs]
3. Background
3.1. At the Enterprise Services Committee of 17 January 2017 approval was given for the
use of Community Benefit funds generated from Middle Muir Windfarm operated by
Banks Renewables. This approval included an allocation of £127,500 or 50% of the
Community Benefit income per annum to the Council to deliver Connect2Renewables
(C2R) employability programme with the remaining 50% administered through the
Council’s Renewable Energy Fund (REF) grants programme. This agreement with the
operator and committee approval was to operate until 2023 with further allocations to
the C2R programme to be subject to review and agreement. 
3.2. The windfarm is located between the villages of Douglas and Crawfordjohn and
comprises of 15 turbines.  In 2017, this generated £255,000 of community benefit and
with inflationary Retail Price Index this has increased to £348,906 in 2023. The eligible
area for use of Community Benefit from the funds is shown within Appendix 1. 
3.3.  The C2R employability support programme delivers help to unemployed people and/or
individuals who require support for skills development within the eligible area of the
wind farm to get into work or study. The fund has been used for 5 categories of support
listed below:- 
 Employment incentive programme - where an employer receives a wage
subsidy for up to a year to employ a resident from the local area.
 Pre employment support grant - a grant of up to £200 to help move people into
work and overcome barriers.
8
77

Page 78

 Grant towards college living costs - a grant of £500 to a local resident starting
college/university for the first time who needs additional support.
 Tailored funding - funding to remove barriers to college or employment which
can include a contribution to such things as computer training, tools, PPE, driving
lessons or lifeguard training for the local leisure centre.
 Non-financial support from staff - this can include guidance and links to
partners and CV advice. 
3.4. In early 2023 Banks Renewables commissioned a study on the outcomes of the
Community Benefit Funds and specifically C2R which are summarised below. 
The number of people supported by the C2R employability fund
since 2018 
Middle Muir
Supported into a job through the employment incentive programme 35
Pre-employment support grant  30
Grant towards college living 51
Tailored financial support 56
Non-financial employment support  171
Totals people supported  343 
3.5. The report concludes that the initiative has been a success and has had significant
benefit to the target groups within the area.  As such, both Banks Renewables and the
Council’s Employability Service believe the C2R programme should continue. 
4. Connect2Renewables continuation.
4.1. Following agreement with Banks Renewables and the Council’s Employability Service,
it is proposed that the Middle Muir C2R programme is extend for a further 5 years to
2028 and that the contribution from the Community Benefit Fund is increased to a
maximum of £174,453 per annum calculated as 50% of the annual income as at  2023. 
4.2. The programme will continue to support unemployed people and/or individuals who
require support for skills development within the eligible area of the wind farm. The
programme will particularly target early-stage employability activity with a particular
focus on disengaged and economically inactive people with a focus on people
experiencing health related barriers and parents including those in low waged / part
time jobs. The C2R programme will continue to develop and adapt and compliment
other Council and national support programmes.  Adaptations or additional support
will be undertaken in partnership with Banks Renewables and the local communities. 
5. Employee Implications
5.1. Currently 1 FTE at Grade 3 level 2 is funded through the C2R programme this post
will continue using the Community Benefit funds and review additional staffing
requirements.   
6. Financial Implications
6.1. There are no additional financial implications for the Council in managing the C2R
programme. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The C2R programme compliments sustainability aims, supporting local people into
local employment and supports local SME employers reducing transport to work
demands by delivering local services. Practical examples of this include, local people
being helped into local jobs on a dairy farm and the local Coalburn Leisure Centre.   
78

Page 79

8. Other Implications
8.1. No other risks or implications as a result of this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Consultation was undertaken with the Council’s Employability Service.   
David Booth
Executive Director (Community and Enterprise Resources) 
22 December 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Executive Committee 3 March 2004, Community Benefit: Establishment of a Renewable
Energy Fund
 Enterprise Services Committee 17 January 2017, Community Benefit Funds – New
Contribution – Middle Muir Wind Farm 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kenny Lean
Economic Development Manager (Funding and Rural), Enterprise and Sustainability
Services
Tel: 07469027925
E-mail: Kenny.lean@southlanarkshire.gov.uk 
79

Page 80

Appendix 1 
80

Page 81

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Lanark Racecourse Masterplan and Wider Racecourse
Update 
1. Purpose of Report
1.1. The purpose of this report is to:- 
[purpose
 inform the Committee of the work undertaken to prepare the Lanark Racecourse
Masterplan
 seek Committee approval to publicise the Masterplan document
 inform the Committee of the next steps in implementing the Masterplan
 inform on progress to deliver the Lanark Community Workshop 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Lanark Racecourse Masterplan be endorsed as the guiding document
for future management and investment at the racecourse site;
(2) that the Lanark Racecourse Masterplan be reported to the Finance and
Corporate Resources Committee and Clydesdale Area Committee for noting
and that it be approved to be published thereafter and made available to parties
with an interest in the site; and
(3) that the progress being made to deliver Lanark Community Workshop be noted. 
3. Background
3.1. Lanark Racecourse and surrounding woodland, part of Lanark’s Common Good, sits
on the edge of the market town and adjacent to Lanark Loch. Formerly a racecourse
the area now performs an important role as open space for the town. As well as there
being formal uses such as an equestrian centre, grass and artificial sports pitches, the
area is popular for walking, trail cycling and other outdoor leisure activities. The
extensive nature and flexibility of the site also lends itself to one off events, such as
horse and dog shows, caravan conventions, sports competitions, and the occasional
concert. 
3.2. Lanark’s Common Good is ‘heritable and moveable property’ which is owned by the
Council which has been passed down through local government reorganisations from
the former Burgh. Common Good assets are owned by the Council and managed for
the benefit of the citizens of the former Burgh. The Common Good funds are held
separately from other local authority funds for accounting purposes. New rules in
relation to Common Good were introduced by the Community Empowerment
(Scotland) Act 2015 and although the Masterplan will form the foundation for future
external funding applications and the delivery of investment on the racecourse, the
9
81

Page 82

relevant legislation will require the community to be formally consulted prior to the
delivery of any project where a property transaction will take place. 
3.3. The Lanark Common Good Fund, supported by revenues attracted from Common
Good Estate, will continue to support activities related to the upkeep of Common Good
assets. The Common Good Estate for Lanark’s annual net financial position can vary
depending on the maintenance and repairs required every year.  At the time of writing
this report, the account has a balance of £250,000, however, it should be noted that
many of the assets that sit in the Common Good Fund are old, and require regular
maintenance, which can be expensive.  Depleting the Common Good Fund balance
would mean that no funding would be available for these other existing assets. The
use of the Fund, to support new investment will, therefore, need to be considered in
the context of the overall Common Good estate and its investment requirements. It is
the intention, therefore, that external funding will lead to the delivery of investment at
the racecourse and not Common Good Funds. 
3.4. South Lanarkshire Council manages the area on behalf of Lanark Community, and it
is important that its management and any future investment reflects the wishes and
aspirations of the community. The Masterplan will form the foundation for future
external funding applications and the delivery of investment on the racecourse will be
led by the success of such applications and not Common Good or central Council
funding. 
3.5. The informal nature of the space along with the historic uses of large sections means
that the racecourse is not used to its full potential. The preparation of a Masterplan to
explore opportunities while recognising the importance of maintaining and supporting
these community uses will seek to maximise its potential. 
3.6.  With outdoor recreation and open spaces coming to the fore during the COVID-19
crisis, of primary importance was engagement with the local community, users and
partners to understand their aspirations for the area which in turn will identify a list of
short, medium and longer-term projects that could be delivered, funding permitting by
suitable organisations. 
4. Lanark Racecourse Masterplan
4.1. Through a competitive procurement process, Ironside Farrar was commissioned to
develop the Lanark Racecourse Masterplan and Priority Project Report. This
considers existing uses within the site and identifies areas of strength and weakness
in terms of the physical environment and other constraints. 
4.2. The Masterplan has been prepared under the guidance of officers within Enterprise
and Sustainable Development Services, Property Services and South Lanarkshire
Leisure and Culture (SLLC), in consultation with the community of Lanark. The
process has also had input from Historic Environment Scotland and NatureScot. 
4.3. In developing the Masterplan, it was key to engage with the local community, as the
asset forms part of the Common Good and is predominantly used by local people. The
Masterplan sets out the process which was undertaken in its preparation and outlines
the results of the community and stakeholder engagement that took the form of 3 in
person engagement events held at the Tolbooth, High Street Lanark, 3 online visitor
surveys and 3 stakeholder workshops involving Council departments and associated
organisations.   
82

Page 83

4.4. The initial consultation exercise identified Lanark Racecourse’s key strengths and
weaknesses which allowed the team to focus on how these could be
enhanced/improved. 
Core Strengths:-
 informal activities (play/walking/cycling)
 natural environment assets
 woodland assets and wildlife
 sports (football/rugby)
 proximity to Lanark Loch and its associated facilities
 scenic value
 equestrian recreation
 events 
Core Weaknesses:-
 lack of investment
 level of activity/facility
 public transport connectivity
 path network
 site orientation and lack of directional signage
 restricted appeal
 accessibility
 conflict of users with equestrian use 
4.5. The Masterplan sets out a range of recommendations as guided by the community
and partner engagement exercise. The main recommended actions/investments focus
on building the sites quality, distinctiveness and appeal including:- 
 Visitor Welcome and Orientation - defining and clearly identifying the entrance
and providing clarity in directional information to improve quality of visitor
experience.
 Heritage Focus - investing in restoration of the Tote building and providing
increased interpretation and improved directional signage to increase visitor
awareness of the site history.
 Protection of Ancient Woodland - combining education with protection through
better visitor information and emphasis on importance of its national status.
 Biodiversity - extending the biodiversity offer through increased planting and
careful proactive management of the site.
 Trails, Routes and Signage - developing clear accessible routes for improved
public access linked with a supporting Interpretive Strategy.
 Connectivity - providing enhanced connections to the wider areas long distance
routes.
 Promoting private sector investment and potential franchise operations for
café/sports development of existing and new partnerships with charities, sports
clubs, voluntary groups and environmental bodies. 
4.6. The Action Plan summary, that forms part of the Masterplan, sets out 26 actions with
associated timescales and potential partners/lead organisations (as set out in
Appendix 1). The Action Plan will remain a live document with projects and priorities
evolving over time. The Masterplan is intended to support the development and
delivery of projects moving forward and assist in securing funding to deliver projects
led by a range of partners. 
83

Page 84

4.7. The Council will have a role to play in the delivery of all proposals within in the Action
Plan. In most cases the role will be that of facility managers and not direct involvement
in delivery. To be clear, however, this report is seeking approval to adopt the
Masterplan as a basis to move forward and approvals relating to specific projects
including funding, delivery, individual business plans and lead partners will be taken
to the appropriate committee for approval at a future date. 
5. Next Steps and Timescale 
5.1. Subject to Committee approval, it is intended that the Lanark Racecourse Masterplan
be reported to Finance and Corporate Resources Committee and Clydesdale Area
Committee for noting.  Thereafter, it is intended that the document be published and
made available to all parties with an interest in the site to guide future investment and
management. 
5.2. Some smaller projects have been identified that, subject to funding, could be taken
forward in the short to medium term. As set out in paragraph 3.3, it is not anticipated
that any of these projects would be funded through existing Council or Common Good
Fund as all the projects have the potential to attract external funding. With appropriate
liaison and agreement these could be taken forward by local organisations, to
maximise any financial opportunities. In many cases this will be led by specific interest
community groups and organisations who may be able to access external funding. 
5.3. When the Masterplan was commissioned the site of the equestrian centre buildings
(Scottish Equestrian Centre and Hotel) was explicitly omitted due to ongoing lease
negotiations. As a result of these negotiations, the current tenant has been given
notice to quit and the Council will have vacant possession of the equestrian centre
building and associated grazings as of July 2024. It is proposed that the window of
opportunity to July 2024 is taken to test the market and seek a new tenant for the
buildings, as a continuity of occupier will minimise any burden on the Council and the
Common Good Fund. The first stage will be the appointment of an appropriate property
consultant to market test the viability of the facility as an equestrian centre or for an
alternate use releasing the grazing land to support the delivery of the Masterplan.   
6. Wider Lanark Racecourse Related Projects 
6.1. Funding of £807,000 from the Scottish Government’s Regeneration Capital Grant
Fund was secured by the Council in 2016 to develop a Clydesdale Rural Development
Centre. The award would have seen the development of new community and business
space together with a community workshop, however, the project could not be
delivered due to difficulties secure a site within the town.   
6.2. Work has been progressing since Autumn 2022 to take forward the dual building
project, on the racecourse site. During the design process it became clear that the
funding available would not allow the project to be delivered in its original form. Despite
detailed enquiries it was not possible to secure sufficient additional funding streams,
either by the Council or the identified occupiers of the business space, Healthy Valleys.
The project has, therefore, been reduced in scope, in agreement with the Scottish
Government, to develop the community workshop only at this time. 
6.3. It is clearly disappointing that the whole project cannot be delivered, however, officers
will continue to work with the community to achieve wider outcomes set out in plans,
as part of the Lanark Vision and Racecourse Masterplan, including exploring options
to develop and enhance business and enterprise resources and capacity in Lanark.
The Council has also offered to work with Healthy Valleys to assist them identify
premises or a site where they can take forward a building project to meet their needs. 
84

Page 85

6.4. The development of the Lanark Community Workshop has secured planning
permission for a location close to the existing car park and the contract has been
awarded with works due to commence in spring 2024.  Tenants for the workshop are
the Lanimer Committee.     
7. Employee Implications
7.1. There are no employee implications through the endorsement of the Masterplan. 
8. Financial Implications
8.1. The costs for the Council in preparing the Masterplan have been funded through
external sources with support from the Place Based Investment Programme approved
at the 9 August 2022 meeting of the Community and Enterprise Resources Committee. 
8.2. As noted, the Masterplan identifies a number of actions and projects which will require
funding. Each will be considered on an individual basis and will be subject to separate
approvals. The Lanark Common Good Fund supported by revenues attracted from
Common Good Estate will continue to support activities related to the upkeep of
Common Good assets. The use of such Funds to support new investment will only be
considered where revenues allow, and approvals will be sought in the usual manner.
It is the intention that external funding will lead the delivery of investment on the
Racecourse and not Common Good. 
8.3. Implementation of the Masterplan will focus on the co-ordination of activity and events
that will largely be funded through external funding. The financial resources required
to deliver the objectives of the Action Plan will be considered on a project-by-project
basis. In addition, the Masterplan provides a basis to support external funding bids
from a range of sources, however, it is important to note that much of the success of
the plan will relate to support and investment from the private sector and the buy in
from the community. 
8.4. Council management of the site will continue from within existing identified budgets. 
9. Climate Change, Sustainability and Environmental Implications 
9.1. The Masterplan was prepared having regard to the existing and emerging challenges
around climate change and sustainability. It is intended to complement and comply
with the Council’s and wider communities’ aspirations in the area. 
10. Other Implications 
10.1. The risks associated with not supporting the proposal is that Lanark Racecourse will
not have a co-ordinated approach to its response to the many challenges it faces. The
support and partnership working within Lanark could be lost, leading to a loss of
activity/interest in the racecourse asset and increased calls for the Council’s
intervention and investment. The Council’s reputation could also be damaged if it is
not seen to actively support and encourage community initiatives and investments in
Lanark Racecourse. 
11. Equality Impact Assessment and Consultation Arrangements 
11.1. This report does not introduce a new policy, function or strategy or recommend a 
change to an existing policy, function or strategy and, therefore, no Impact 
Assessment is required. 
11.2. Consultations have been co-ordinated by the Enterprise and Sustainable
Development Services with a range of other Council Services who have an ongoing
role in delivering services and initiatives at Lanark Racecourse. This consultation and
co-operation will continue throughout the duration of the initiative.
85

Page 86

David Booth
Executive Director (Community and Enterprise Resources) 
22 December 2023 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, Effective, Efficient and Transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live. 
Previous References
 Community and Enterprise Resources Committee – 9 August 2022 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
John Archibald
Project Development Officer, Enterprise and Sustainable Development Services
E-mail: john.archibald@southlanarkshire.gov.uk 
86

Page 87

Appendix 1
Action Plan Summary 
WOODLAND MANAGEMENT AND BIODIVERSITY
REF ACTION PLAN TASK PARTNERS (Suggested
lead BOLD). In all cases
SLC involvement will be
through existing staff
resource as capacity allows 
SHORT
TERM
MEDIUM
TERM
LONG
TERM
Nature
of cost
Source
of
Funding
Return on
Investment
1-3yrs 3-5yrs 5-
10yrs
+
WMB1 Tackle issues
with fallen trees
in maturing
plantation
woodland to
facilitate
access. 
Physical works SLC Y     Revenue Common
Good/
Existing
SLC
budgets/
External
Funding
Obligation to
keep area safe
WMB2 Undertake a
Woodland
Management
Plan to identify
opportunities to
add diversity of
species within
all areas and
through a
sympathetic
phased
clearance of
plantation areas
and for the
expansion of
woodland and
tree cover.
Strategy SLC/NatureScot/Wildlife
Trust  
Y   One off Existing
SLC
budgets/
External
Funding
Management
obligation -
supports climate
change agenda 
87

Page 88

WMB3 Review
opportunity to
add/enhance
bird and bat
habitat
throughout the
woodland
areas. 
Physical works SLC/NatureScot/Wildlife
Trust/Community
Y     One off External
Funding
Improved
biodiversity and
wildlife habitat
WMB4 Reinforce the
importance of
the line of
historic Beech
trees through
their
management
protection and
enhancement
Strategy/Planning  SLC Y     Revenue Existing
SLC
budgets/
Common
Good/
External
Funding
Management
obligation
WMB5 Enhance the
existing wetland
area to improve
species
diversity and
increase
potential
educational use
and activity. 
Design SLC/NatureScot/Wildlife
Trust/Community/Schools/
CSGN    
Y One off External
Funding
Improved
biodiversity and
wildlife habitat  
88

Page 89

FACILITIES  
REF ACTION
PLAN
TASK PARTNERS (Suggested lead
BOLD). In all cases SLC
involvement will be through existing
staff resource as capacity allows 
SHORT
TERM
MEDIUM
TERM
LONG
TERM
Nature
of cost
Source
of
Funding
Return on
Investment
1-3yrs 3-5yrs 5-
10yrs
+
F1 Improved
sport changing
facilities,
toilets and
shelter should
funding
become
available.
Proposals
should
consider
increased
variety of
sports on
offer.
Evaluation
and Business
case
SLC Leisure Trust/local user
groups and clubs  
Y   One off
and
ongoing 
External
Funding
and
income
revenues 
Facilities would
be run by the
delivery
organisation/club
who would use
revenues to
support the
activity
F2 Undertake a
feasibility
study to
identify viable
options for
long term uses
for the Tote
building.
Evaluation
and Business
case
SLC/ HES/private partners   Y   One off  External
Funding 
Currently a
financial burden
due to
maintenance
costs of an A
listed building.
Study an
opportunity to
unlock building
potential
F3 Introduce
picnic areas
around the
site to
increase
Design SLC/NatureScot/CSGN/Community 
groups
Y     One off External
Funding
Enhanced visitor
experience
89

Page 90

amenity for
local people
and
encourage
use.
F4 Increased
informal
recreation
opportunities
through
introduction of
outdoor gym
facilities.
Design SLC/NatureScot/CSGN/Community 
groups
Y     One off  External
Funding
Enhanced visitor
experience
F5 Introduce
power
provision on
southern area
of the course
to encourage
increased use
for events.
Design SLC Y     One off
and on
going
External
Funding
Improved
facilities improve
attractiveness of
site and increase
revenues from
site hire for
events
F6 Introduce
allotments and
community
orchard within
a small area of
the east of the
site to
establish site
viability.
Design SLC/Community groups Y     SLC External
Funding
Obligation on
Council to supply
allotment
opportunities.
Rental income
from users to
support ongoing
costs 
F7 Introduce
camper van
overnight
parking, EV
charging and
disabled
parking in the
primary car
park.
Design SLC/Community groups Y     One off
and
ongoing 
External
Funding
Facilities would
be run by the
delivery
organisation/club
who would use
revenues to
support the
activity. Ground
rent to Common
Good 
90

Page 91

F8 Create
opportunities
for the
introduction of
a Pump track
bicycle facility
within the site.
Design SLC/Community groups Y     One off
and
ongoing 
External
Funding
Improved
facilities and
support of move
to sustainable
transport. Facility
would be
developed and
managed by
appropriate local
organisation 
F9 Further
explore
caninecross or
dog agility
facilities within
the site.
Design SLC/Community groups Y     One off External
Funding
Enhanced visitor
experience
F10 Undertake
detailed
review of
opportunities
for a
Uniformed
campsite with
local Scout/
Guide and
Boys Brigade
associations.
Evaluation
and Business
case
SLC/Community, Scout, Guide BB
associations
Y     One off External
Funding
Facilities would
be run by the
delivery
organisation/club
who would use
revenues to
support the
activity  
91

Page 92

ACCESS AND ACCESSIBILITY  
REF ACTION PLAN TASK PARTNERS (Suggested lead
BOLD). In all cases SLC
involvement will be through existing
staff resource as capacity allows 
SHORT
TERM
MEDIUM
TERM
LONG
TERM
Nature
of cost
Source of
Funding
Return on
Investment
1-3yrs 3-5yrs 5-
10yrs
+
AA1 Address pot
holes and poor
drainage in car
parks 
Physical
works
SLC Y     Revenue Common
Good/Existing
SLC budgets/
External Funding
Obligation to
provide safe
access
AA2 Access routes
for less able
users with
appropriately
spaced resting
and seating
points should
be introduced
to enable use
by all.
Design SLC/Community groups   Y   One off External Funding Enhanced
visitor
experience
AA3 Improved area
wide active
travel routes
will be
reinforced and
a connection to
Springbank
Cemetery
established.
Design SLC/Community groups   Y   one off External Funding Enhanced
visitor
experience
AA4 Clear
orientation and
waymarker
signage to
reduce conflict
on paths
Strategy SLC/SL Access Forum/Community Y     One off External Funding Enhanced
visitor
experience
92

Page 93

between
pedestrians,
cyclists and
equestrian use.
AA5 Improvements
to site wide
signage 
Strategy SLC/SL Access Forum/Community Y     One off External Funding Enhanced
visitor
experience  
93

Page 94

SITE PERCEPTION  
REF ACTION PLAN TASK PARTNERS (Suggested lead
BOLD). In all cases SLC
involvement will be through existing
staff resource as capacity allows 
SHORT
TERM
MEDIUM
TERM
LONG
TERM
Nature
of cost
Source of
Funding
Return on
Investment
1-3yrs 3-5yrs 5-
10yrs
+
SP1 Protect and
enhance views
to the Tote
Tower and seek
to reintroduce
building
signage and
graphics.
Design SLC/HES/Community groups   Y  One off External Funding Enhance
gateway to
town and
improve
visitor
experience 
SP2 A73 road
boundary
improvements.
Design SLC/NatureScot/Wildlife Trust   Y   One off External Funding Enhance
gateway to
town and
improve
visitor
experience 
SP3 Establish clear
entrance
signage and
remove clutter
on arrival from
the A73 to the
main car park.
Strategy
and
Design
SLC Y     One off External Funding Enhance
gateway to
town and
improve
visitor
experience 
SP4 Undertake
enhanced area
maintenance to
acknowledge
site importance
and protect the
historic
Physical
works
SLC Y     On
going 
External Funding
/Common Good
and existing SLC
budgets
Enhanced
visitor
experience
94

Page 95

racecourse
route.
SP5 Use materials
and interpretive
signage to
strengthen links
to and
awareness of
the site
heritage.
Strategy
and
Design
SLC/
HES/NatureSCot/CSGN/Community
groups
Y     One off  External Funding
/Common Good
Enhanced
visitor
experience
SP6 Increase
quantities
and/or size of
bins throughout
the Racecourse
to ensure
adequate
capacity.
Physical
works
SLC Y     One off
and
ongoing 
External Funding Existing
obligation to
manage litter
collection 
95

Page 96

96

Page 97

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Inward Investment Strategy 
1. Purpose of Report
1.1. The purpose of the report is to:-  
 provide an update on the work being undertaken to refresh the Council’s approach
to Inward Investment within South Lanarkshire 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that approach to Inward Investment within South Lanarkshire be approved. 
3.  Background
3.1. Inward investment makes a distinct and significant impact on Scotland’s economy at
both a national and regional level.  The term ‘inward investment’ describes both foreign
direct investment (FDI) and similar investment from the rest of the UK into Scotland. 
Inward investment companies make a positive and significant impact on Scotland’s
economy.  They are typically more productive and pay higher than average wages
compared to domestic businesses. They are more likely to operate in export sectors
and to have a higher proportion of spend on research and development and
innovation. 
3.2. Scotland’s Inward Investment Plan: Shaping Scotland’s Economy sets out the national
approach to targeting and attracting inward investment. Scottish Development
International (SDI) is Scotland's trade and inward investment agency. They engage
with major businesses and investors from around the world to encourage them to do
business in or with Scotland.  Over the last 12 months the Council has sought to
strengthen its relationship with key SDI representatives and tap into the inward
investment opportunities that they have provided.  However, it is apparent that more
could be done to strengthen the Council’s approach to inward investment.  This paper
sets out various initiatives being developed by Enterprise and Sustainable
Development Services. 
4. South Lanarkshire Inward Investment Strategy
4.1. The Strategy consists of 5 workstreams:- 
 establishment of a cross resource in-house team to drive forward investment in
South Lanarkshire
 creation of a cross resource property enquiry data base to track enquiries which
can be monitored and analysed
10
97

Page 98

 development of a stand-alone South Lanarkshire Inward Investment website to
promote Council and key stakeholder sites
 development of a South Lanarkshire Inward Investment proposition document or
‘pitch book’
 foster closer relationships with SDI, Scottish Enterprise (SE), property agents,
developers and investors 
4.2. Cross Resource In-House Team
4.2.1. It has become apparent that both Enterprise and Sustainable Development Services
and Property Services separately receive property enquiries, however, in the past this
has not always been entirely co-ordinated, monitored or analysed.  Since taking up
post, the Head of Enterprise and Sustainable Development has brought together key
officers across both Resources to meet regularly to develop this Strategy, collaborate
and identify opportunities.   
4.3. Property Enquiry Data Base
4.3.1. As outlined in paragraph 4.2.1, property enquiries to the Council are routed through 2
resources.  To ensure that these can be properly actioned, monitored and analysed a
standard database has been created and monitored on a monthly basis.  This was
established in September 2023 and since then 43 enquiries have been received.
Some initial findings were:- 
 around 80% of enquiries were seeking industrial space of up to 5,000sq, ft with
no units within the Council property portfolio available to accommodate them
 around 10% of enquiries were seeking larger scale premises that cannot be
satisfied in the South Lanarkshire area
 land requirements for serviced plots of up to 2 acres accounted for around 11%
of enquiries. 
Companies seeking space included those operating in:- 
 construction
 food and drink
 green energy
 healthcare/life sciences
 transport/vehicle related activity
 manufacturing 
4.3.2. Enquiries for larger premises and serviced land cannot be accommodated at present
due to lack of supply. This constrains the ability of existing companies to develop their
current operations within South Lanarkshire and for inward investors to make South
Lanarkshire their first choice. 
4.3.3. It is intended that this data base will be analysed quarterly and reported to Community
and Enterprise Resources Committee twice per year.   
4.4. Inward Investment Website
4.4.1. Most local authorities in Scotland have a dedicated inward investment website. These
websites operate separately from the Council’s main website and have a distinct and
separate identity and brand. The purpose of these websites is to promote the area to
potential investors and developers from both within the UK and overseas. Fife and
West Lothian are 2 of the best current examples:- 
www.investinwestlothian.com
98

Page 99

www.investfife.co.uk 
4.4.2. The website will promote South Lanarkshire’s Unique Selling Point presenting
information on:- 
 our modern infrastructure
 our key business sector
 key business locations and investment opportunities (both Council and
stakeholders)
 our skills base
 South Lanarkshire as a place to live, work and relax
 partner organisations - SDI, Further and Higher Education providers, Skills
Development Scotland, Business Gateway etc.
 news and events relevant to Inward Investment
 case studies of positive Inward Investment experiences
 Inward Investment contact information. 
4.4.3. Without an online offer to demonstrate what South Lanarkshire has to offer it is difficult
to pitch South Lanarkshire as a key investment location to potential inward investors
in a competitive market place. The website will be a ‘one stop shop’ for investors and
developers, demonstrating South Lanarkshire’s unique attraction for major employers
and help make any move to South Lanarkshire as smooth as possible. The key
message must be that ‘South Lanarkshire is open for business’. 
4.4.4. Branding and website designers have been procured and work is ongoing with IT and
Corporate Communications to develop and deliver both of these activities, in line with
SLC standards and requirements.   
4.5. Proposition Document
4.5.1. A Proposition Document will showcase all South Lanarkshire has to offer and will
summarise the website content. Whilst available in hard copy it will primarily be
available in digital format to allow regular updates to be made. The document will have
multiple uses:- 
 It can be shared with colleagues in SDI/Scottish Enterprise to ensure they are
aware of all that South Lanarkshire has to offer to future investors.
 It can be used at relevant trade and industry events.
 It can be used when communicating with local and national property agents.
 Aspects of it will be used to create marketing campaigns to raise awareness of
South Lanarkshire as a great place to live, work and relax. 
4.5.2. The document will provide key contact information of a named individual at South
Lanarkshire Council who can deal with any enquiries in a fast, efficient and
professional manner providing a ‘one stop shop service’.   
4.6. Relationship Building
4.6.1. Crucial to successful inward investment is intelligence gathering; being close to the
market to know of emerging enquiries, lease breaks etc.  This is achieved by fostering
relationships with property agents, SDI, SE etc. and by attending property events.   
5.  Key Challenges
5.1. Enterprise and Sustainable Development Service commissioned commercial property
consultants Ryden to undertake a review of the commercial and industrial property
supply in a number of areas across South Lanarkshire.  This work is concluding and
99

Page 100

will be the subject of a separate report to Committee in due course.  This information
will inform market capacity to satisfy requests from inward investors as well as
assisting expanding local companies to source suitable accommodation. 
5.2. The reports identify a number of issues that constrain the ability of the area to satisfy
inward investment enquiries including:- 
 a lack of new industrial supply coming to the market
 vacancy rates are low and some established industrial estates have no available
supply
 older premises are becoming obsolete and have poor energy performance
 there is limited refurbishment of existing stock taking place by private asset
management firms
 levels of industrial stock have fallen as a result of redevelopment of sites for
residential use
 there is little or no demand for new build speculative office accommodation
 the supply of serviced development plots that would be attractive to inward
investors is critically low – this echoes the views of SDI and SE 
5.3. In the current situation where market failure is widespread, it is difficult to
accommodate inward investment enquiries - a recent inward investor from America
with a strong preference for an East Kilbride base required to locate out with South
Lanarkshire due to a lack of available space to meet their timescales. 
5.4. Whilst the creation of an inward investment website will be important to accommodate
new inward investment enquiries and meet the needs of expanding indigenous
companies, there needs to be a supply of development ready sites.  Sites owned by
developers at Shawfield and Conexus at Poneil are development ready, however, key
sites owned by the Council at Langlands in East Kilbride and Canderside at Larkhall
require investment to undertake infrastructure works before bringing them to the
market.  Proposals are currently being developed for these sites. 
6. Next Steps and Timescales
6.1. It is intended that the new website will be live in April 2024. Marketing materials and a 
programme of targeted events to help raise the profile of South Lanarkshire as an area
to invest will also take place during 2024. This will be achieved by developing a
stronger relationship with SDI, partner organisations, agents and developers.  It is
intended to have a presence at relevant exhibitions where South Lanarkshire can be
promoted to a wider audience. 
7 Employee Implications
7.1. The development and implementation of the Inward Investment Strategy will be taken
forward by officers with Enterprise and Sustainable Development Service. 
8 Financial Implications
8.1. A budget of £50,000 has been identified for this initial activity and will be funded from
the existing ‘Get South Lanarkshire Working’ budget.  More limited funding for future
years activity (for web site development, events etc.) will be met from existing revenue
budgets.   
9. Climate Change, Sustainability and Environmental Implications
9.1. This project will be taken forward in line with the Council’s sustainability objectives.
100

Page 101

10. Other Implications
10.1. The risks associated with not supporting the proposal is that South Lanarkshire will
not have a co-ordinated and effective presence when inward investment opportunities,
that will effectively grow the local economy, are on offer. The Council’s reputation may
be damaged if it does not proactively support and encourage inward investment in the
area. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, therefore, no Impact Assessment is
required. 
11.2. Consultations have been co-ordinated by Economic and Sustainable Development
Services with a range of other Council services who have an ongoing role in Inward
Investment. This consultation and cooperation will continue throughout the duration of
the initiative. 
David Booth 
Executive Director (Community and Enterprise Resources) 
22 December 2023 
Link(s) to Council Values/Priorities /Outcomes
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Working towards a sustainable future in a sustainable environment
 Thriving business, fair jobs and vibrant town centres 
Previous References
 None 
List of Background Papers
 Scottish Enterprise International Operating Plan 2023/2024
 Summary Report - Scotland’s Inward Investment Plan: Shaping Scotland’s Economy
 Glasgow City Region Investment Proposition September 2021 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Alison Brown, Head of Enterprise and Sustainable Development
Tel: 01698 454700
Email: alison.brown@southlanarkshire.gov.uk 
101

Page 102

102

Page 103

Report
Agenda Item 
To: Community and Enterprise Resources Committee 
Date: 6 February 2024
Prepared by: Executive Director (Community and Enterprise
Resources)  
Subject: UK Levelling Up Fund - Round 3 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the outcome of round 3 of the UK Levelling Up Fund (UKLUF)
 provide an overview of the next steps 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the outcome of the UKLUF Round 3 be noted; and
(2) that the next steps be noted.
[recs]
3. Background
3.1. As reported to Community and Enterprise Resources Committee on 30 May 2023, the
UKLUF is a capital fund which can make awards of up to £20 million for regeneration,
town centre and cultural investments, and awards of up to £50 million for transport
investments. Match funding of 10% is required. The fund has a budget of £4.8 billion,
of which £800 million is ring fenced for Scotland, Wales, and Northern Ireland. 
3.2. The UKLUF Round 1 was launched March 2021 with successful bids announced in
November of that year. Round 2 was launched March 2022, successful bids were
announced in January 2023. Both rounds 1 and 2 operated as traditional challenge
funds with bids from across the UK competing for the available funding.     
3.3. The bids, detailed below, submitted by South Lanarkshire Council (SLC) in the first 2
rounds of UKLUF were unsuccessful:- 
 Round 1
1. EV@SL: Levelling Up South Lanarkshire 
 Round 2
1. EV@SL: Levelling Up South Lanarkshire
2. National Business District: Shawfield Remediation and Development
3. Three Rivers Active Tourism: Clydesdale Way 
11
103

Page 104

4. UK Levelling Up Fund Round 3  
4.1. In November 2023, the UK Government’s Department for Levelling Up, Housing and
Communities announced that following feedback from local authorities, and in line with
the principles set out in the Funding Simplification Plan, round 3 of the UKLUF would
move away from the competitive approach of rounds 1 and 2, and would see funding
awarded to high-quality bids that were submitted in round 2. 
4.2.    On 20 November 2023, the Council received formal notification that UKLUF Round 3
awards would be allocated based on bids submitted in round 2, and that 2 South
Lanarkshire bids had been shortlisted for an allocation:- 
 National Business District: Shawfield Remediation and Development
 Three Rivers Active Tourism: Clydesdale Way (Joint bid developed in partnership
with Dumfries and Galloway Council (DGC) and Scottish Borders Council (SBC)). 
4.3. Full details of project values, UKLUF grant requested, and match funding requirements
are detailed in the table below:- 
Project
Name
Partners Total Project
Value
LUF Grant
Requested
Match Funding
and Source 
National
Business
District:
Shawfield
Remediation
and
Development 
Clyde
Gateway
Urban
Regeneration
Company
(URC) 
£16,264,000  £14,637,600  £1,626,400 
Clyde Gateway
Developments
Limited 
Three Rivers
Active Tourism 
Partnership
Project:
-Clydesdale Way
SLC
-Annan Harbour
DGC
-Chambers
Institute SBC 
Dumfries and
Galloway
Council 
(Lead
Applicant) 
Scottish
Borders
Council 
£25,343,796 
Of which:
£7,550,000 (SLC)
£13,131,796 (DGC)
£4,662,000(SBC) 
£22,809,416 
Of which:
£6,795,000 (SLC)
£11,818,616 (DGC)
£4,195,800 (SBC) 
£2,534,380 
Of which:
£755,000 (SLC)
£1,313,180 (DGC)
£466,200(SBC)   
4.4. UK Government officials have confirmed that the provisional award of funding is for
these specific projects and that the money cannot be used to support activity that is
substantially different. In addition, the award is subject to project validation, subsidy
control checks, and UK Government departmental sign-off. 
4.5. In December 2023, the Enterprise and Sustainable Development Service (ESDS)
completed initial validation checks for both awards, which have a total value of
£23,814,000. Details of the next, more detailed, stage of the UK Government’s
validation and onboarding process is anticipated late December 2023/January 2024.       
104

Page 105

5. UKLUF Project Outlines 
5.1. National Business District: Shawfield Remediation and Development
Developed in partnership with Clyde Gateway URC, this project will support
remediation and development at the National Business District – Shawfield Phase 2. 
The project will help address the historical legacy of chromium contamination at
Shawfield via ground remediation, improvements to the ground water and the
development of business space to stimulate local economic activity through
enhancement of the built environment, attracting and supporting business activity in
the Clyde Gateway area, and providing training and employment opportunities.       
5.2. Three Rivers Active Tourism: Clydesdale Way  
Developed in partnership with Dumfries and Galloway Council (lead applicant) and
Scottish Borders Council, the project is focussed on the Dumfriesshire, Clydesdale,
and Tweeddale constituency. The bid was developed to promote tourism, culture and
rural economies and is made up of 3 projects, one from each of the three local
authorities. South Lanarkshire’s project focuses on the rural path and cycling network
through the development of the Clydesdale Way.  The Clydesdale Way will transform
access and connectivity within and between rural communities by enhancing the path
network and visitor infrastructure which will in turn support place, tourism, and local
community needs. 
6. UK LUF Next Steps
6.1.     National Business District: Shawfield Remediation and Development
The project will be delivered by Clyde Gateway on behalf of South Lanarkshire Council
using the well-established governance structures Clyde Gateway and South
Lanarkshire Council have in place. Reporting requirements will be updated to reflect
UK Government guidance.  A Delivery Plan has been developed and Clyde Gateway
have confirmed the current programme allows for all necessary statutory consents and
regulatory approvals to be in place throughout 2024, permitting each scheme to
progress separately through procurement, construction, and implementation, in
advance of the March 2026 deadline for the UKLUF Round 3 funding. This will include
any land acquisition, third party agreements, wayleaves etc. 
6.2. Three Rivers Active Tourism: Clydesdale Way 
ESDS is undertaking a comprehensive review of the project as originally envisaged to
assess deliverability and to identify any adjustments that may need to be made for
example, as a result of inflationary pressures. The ESDS team is working with
colleagues across Resources including Legal, Procurement, Planning, Roads,
Countryside and Estates to identify and agree individual Resource’s requirements,
secure buy in, and progress early mobilisation activities to inform the project scope,
procurement solution, risk register etc. A governance structure will be developed and
implemented which reflects the scale of the project together with the reporting
requirements of both the UK Government and partner local authorities. 
7. Employee Implications
7.1. ESDS is working with colleagues across the Council to develop a Resource Schedule
which will identify staffing and support requirements within all services involved and
inform planning and work programmes.   
8. Financial Implications
8.1. Match funding values and sources are set out in this report. South Lanarkshire
Council’s match funding for the Clydesdale way project is in place.   
9. Climate Change, Sustainability and Environmental Implications
105

Page 106

9.1. The projects will make significant contribution to the local environment through the
remediation of significant land contamination and the creation of new active travel and
leisure path networks. 
10. Other Implications 
10.1. The UKLUF awards provide significant capital investment in South Lanarkshire and
will contribute to priorities set out in Connect, the Council Plan 2022 to 2027. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. There is no requirement to carry out an impact assessment in terms of the updates
contained within this report. Consultation and project development activity is ongoing
with a number of resources.   
David Booth  
Executive Director (Community and Enterprise Resources) 
22 December 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 UK Levelling Up Fund Update,  Community and Enterprise Resources Committee, 30
May 2023 
 Members Briefing UK Funds Briefing 10 September 2021 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Pauline Crisp
Team Leader, Enterprise and Sustainable Development Services
Email: pauline.crisp@southlanarkshire.gov.uk 
106

Page 107

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 6 February 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Notification of
Contracts Awarded - 1 April to 30 September 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification in line with Standing Orders on Contracts to Committee of
all contracts awarded by Community and Enterprise Resources during the
period 1 April to 30 September 2023.
1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts that
details of the acceptance of all tenders above £50,000 be reported retrospectively to
the relevant Committee for noting, other than those under Clause 21.3 where the
award is not the lowest in a price only tender, or costs exceed the approved financial
provision.  In these instances a report is submitted to the appropriate Committee and
subsequent authority to award is granted by that Committee. 
4. Contract Awards
4.1. A full list of contracts awarded during the period 1 April to 30 September 2023 on the
basis of lowest offer and/or most economically advantageous offer submitted, is
provided at Appendix 1. 
5. Employee Implications
5.1. Contracts management including performance appraisal will be undertaken by both
the main user Services and Procurement. 
6. Financial Implications
6.1. There are no financial implications associated with this report which is for information
purposes only. Appropriate budgetary provision is available for each of the contracts
awarded. 
7. Other Implications
7.1. There is a risk that failure to report awards may lead to contracts being awarded that
do not represent best value, breach statutory procurement obligations and Standing
Orders or do not follow internal processes which mitigate the risk. 
12
107

Page 108

8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
11 January 2024 
Link(s) to Council Values/Priorities/Outcomes 
 Accountable, effective, efficient and transparent 
Previous References
 Community and Enterprise Resources Committee 7 November 2023 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk 
108

Page 109

Appendix 1 
Community and Enterprise Resources 
Contracts Awarded over £50,000 in value 
Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
GGR Group Ltd SLC/PS/COMENT/22/157 £72,761.00 03/04/2023 Supply and Delivery of Mini Crawler
Crane
03/04/2023 -
29/09/2023
Richard Aitken
(Seedsman) Ltd
SLC/PS/COMENT/22/092 £3,109,015.90 06/04/2023 The Supply and Delivery of Grounds
Maintenance Materials
06/04/2023 -
31/03/2028
Origin Amenity Solutions
Ltd
SLC/PS/COMENT/22/092 £3,109,015.90 06/04/2023 The Supply and Delivery of Grounds
Maintenance Materials
06/04/2023 -
31/03/2028
Ricardo-Aea Ltd SLC/PS/COMENT/21/178 £130,640.00 11/04/2023 Air Quality Monitoring Support
Services
01/04/2023 -
01/04/2026
(Option to
extend until
01/04/2028)
Metdesk Limited SLC/PS/COMENT/22/040 £13,500,000.00 12/04/2023 The West of Scotland Local
Authorities Weather Forecast and
Maintenance Partnership
16/05/2023 -
15/05/2028
(Option to
extend until
15/05/2033)
Hillhouse Quarry
Company 
SLC/CE/23/023 £52,504.96 17/04/2023 Supply and Delivery of Roadstone  17/04/2023 -
21/04/2023
Motus Commercials SLC/CE/23/028 £104,220.00 26/04/2023 Supply and delivery of Heavy
Vehicles 
26/04/2023 -
31/07/2023
SLR Consulting SLC/PS/COMENT/22/148 £134,658.00 26/04/2023 Waste Consultancy Services  26/04/2023 -
31/03/2025
(Option to
extend until
31/03/2026)
109

Page 110

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Scottish Borders Council SLC/PS/COMENT/22/024 £2,000,000.00 28/04/2023 Supply and Application of Tanker
Applied Road Surface Coatings
01/05/2023 -
30/04/2028
AECOM Ltd SLC/PS/COMENT/22/151 £116,673.20 10/05/2023 Local Transport Strategy for South
Lanarkshire Council
11/05/2023 -
31/01/2024
Dennis Eagle Ltd SLC/CE/23/050 £1,130,022.00 30/05/2023 Supply and delivery of Heavy
Vehicles 
30/05/2023 -
31/12/2023
Hillhouse Quarry Group
Ltd
SLC/CE/23/129 £58,978.50 01/06/2023 Supply and Delivery of Roadstone  01/06/2023 –
30/06/2023
Certas Energy UK Ltd                               SLC/CE/23/052  £7,135,604.00 08/06/2023 Supply and Delivery of Liquid Fuels 17/05/2023 -
31/03/2025
Highland Fuels Ltd SLC/CE/23/052  £7,135,604.00 08/06/2023 Supply and Delivery of Liquid Fuels 17/05/2023 -
31/03/2025
Aebi Schmidt UK Ltd SLC/CE/23/053 £87,626.00 08/06/2023 Supply and delivery of Heavy
Vehicles 
08/06/2023 -
31/12/2023
Bernard Corrigan Ltd SLC/CE/23/043 £2,046,000.00 09/06/2023 Direct Award for the Supply and
Distribution of Fresh Meats, Cooked
Meats and Fresh Fish
08/06/2023 -
31/03/2027
Campbells Prime Meat
Ltd
SLC/CE/23/043 £2,046,000.00 09/06/2023 Direct Award for the Supply and
Distribution of Fresh Meats, Cooked
Meats and Fresh Fish
08/06/2023 -
31/03/2027
Brakes SLC/CE/23/043 £2,046,000.00 09/06/2023 Direct Award for the Supply and
Distribution of Fresh Meats, Cooked
Meats and Fresh Fish
08/06/2023 -
31/03/2027
Brett Nicholls Associates
Limited
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
CIM Project Financial
Mgmt Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Kl Business Consulting
Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
110

Page 111

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Inspirent Ltd NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Secure Business
Advisors Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Concept HR Solutions NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Intend Business
Development Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Morrow Associates
Limited
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Optimum Business
Growth Limited
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Tinto Procurement NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
JA Lloyd T/A Gap
Communications
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
JandG3 Ltd NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
NSDesign Ltd  NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
111

Page 112

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
SBP (Scotland) Limited NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Managed IT Experts Ltd NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Solutions On Demand
Limited
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Glasgow Chamber of
Commerce
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Mabbett and Associates
Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Stirton Consulting Ltd NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Where Now Consulting
Ltd
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Russell McLeod Limited NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
MJM Associates
(Scotland) Limited
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Themacdogfactory
Limited T/A Brexeasy
NLC-CPT-22-146 £131,666.66 12/06/2023 Framework Agreement for Business
Support and Expert Help Services
2023 - 2025
03/07/2023 -
31/03/2025
Hillhouse Quarry Group
Ltd
SLC/CE/23/130 £52,296.00 15/06/2023 Supply and Delivery of Roadstone  15/06/2023 –
14/07/2023
112

Page 113

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Lloyd Ltd SLC/CE/23/061 £646,060.00 19/06/2023 Supply and delivery of Plant  19/06/2023 -
29/12/2023
Molson Scotland Ltd SLC/CE/23/061 £646,060.00 19/06/2023 Supply and delivery of Plant 19/06/2023 -
29/12/2023
Hillhouse Quarry Group
Ltd
SLC/CE/23/134 £191,698.65 19/06/2023 Supply and Delivery of Roadstone  19/06/2023 –
07/07/2023
Motus Commercials SLC/CE/23/062 £388,815.00 19/06/2023 Supply and delivery of Heavy
Vehicles 
19/06/2023 -
29/12/2023
Bustec Scotland Ltd SLC/PS/COMENT/22/004 £980,000.00 19/06/2023 Framework for the Provision of
Vehicle Body Repairs
19/06/2023 -
18/06/2027
Riverside Truck Rental
Ltd
SLC/PS/COMENT/22/004 £980,000.00 19/06/2023 Framework for the Provision of
Vehicle Body Repairs
19/06/2023 -
18/06/2027
Agmors Coachworks Ltd SLC/PS/COMENT/22/004 £980,000.00 19/06/2023 Framework for the Provision of
Vehicle Body Repairs
19/06/2023 -
18/06/2027
Hillhouse Quarry Group
Ltd
SLC/CE/23/131 £57,052.50 20/06/2023 Supply and Delivery of Roadstone  20/06/2023 –
19/07/2023
Hillhouse Quarry Group
Ltd
SLC/CE/23/132 £56,680.00 01/07/2023 Supply and Delivery of Roadstone 01/07/2023 –
31/07/2023
Cromwell Polythene Ltd SLC/CE/23/029 £95,976.00 05/07/2023 Supply and Delivery of Compostable
Food Waste Liners
10/07/2023 -
09/07/2024
(Option to
extend until
09/07/2025)
Hillhouse Quarry Group
Ltd
SLC/CE/23/133 £72,240.00 10/07/2023 Supply and Delivery of Roadstone 10/07/2023 –
09/08/2023
Intelligent Health SLC/CE/23/063 £494,237.00 02/08/2023 Beat the Street 08/08/2023 -
07/08/2025
(Option to
extend until
07/08/2027)
Elveden Farms Ltd SLC/CE/23/042 £62,847.00 04/08/2023 Supply and Delivery of Christmas
Trees 2023
04/08/2023 -
31/12/2023
113

Page 114

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Chargemaster Ltd SLC/CE/23/084 £165,000.00 09/08/2023 Installation of Electric Vehicle
Charging Points (various locations) 
09/08/2023 -
29/02/2024
Park's of Hamilton
(Townhead Garage) Ltd
SLC/CE/23/085 £90,195.46 10/08/2023 Supply and Delivery of Light Vehicles
for the 2023 - 2024 financial year
10/08/2023 -
31/08/2023
Motus Commercials SLC/CE/23/086 £155,955.00 10/08/2023 Supply and delivery of Heavy
Vehicles
10/08/2023 -
31/03/2024
Maclay Civil Engineering
Ltd
SLC/PS/COMENT/22/106  £1,539,674.95 14/08/2023 NEC3 Engineering and Construction
Contract Option B for A72 / M74
Junction 7 Signalisation
14/08/2023 -
01/03/2024
Hillhouse Quarry Group
Ltd
SLC/CE/23/135 £74,473.48 16/08/2023 Mini Comp under SXL Supply and
Delivery of Roadstone FW 16-21 -
Clydesdale Area A721 Elsrickle
16/08/2023 –
31/08/2023
Sportex Group Ltd SLC/CE/23/059 £92,814.07 28/08/2023 Upgrade of Whitemoss Tennis Court,
East Kilbride
07/09/2023 -
02/11/2023
Bryson Tractors Ltd SLC/CE/23/064 £78,700.00 06/09/2023 Supply and Delivery of Compact
Tractor 
06/09/2023 -
30/09/2023
Inspirent Ltd SLC/CE/23/030 £163,400.00 14/09/2023 South Lanarkshire Council Social
Enterprise Business Accelerator
02/10/2023 -
31/03/2024
(Option to
extend until
31/03/2025)
Hillhouse Quarry Group
Ltd
SLC/CE/23/136 £59,769.40 19/09/2023 Supply and Delivery of Roadstone  19/09/2023 –
30/09/2023
Parks Motor Group SLC/CE/23/103 £179,382.55 26/09/2023 Supply and delivery of Heavy
Vehicles 
26/09/2023 -
31/03/2024
A M Phillip Trucktech Ltd SLC/CE/23/104 £197,987.00 26/09/2023 Supply and delivery of Heavy
Vehicles 
26/09/2023 -
31/03/2024 
114

Page 115

Contract extensions awarded over £50,000 in value 
Contractor Contract Reference Value of Contract
Awarded
Date of
Extension Brief Description
Contract
Extension
period 
Fast Fixx Catering
Engineers Ltd  SLC/PS/COMENT/22/031 £450,000.00 03/04/2023
Repair, Inspection and
Maintenance of Commercial
Catering Equipment
01/05/23 -
30/04/24
Mac-Electrical and
Welding Services  SLC/PC/COMENT/20/096 £50,000.00 16/05/2023
Maintenance and Repair of
Portable Gas Appliances.
18/05/23 -
17/05/24
SSI Schaefer
Limited  SLC/PS/COMENT/22/051 £850,000.00 15/06/2023
Supply and Delivery of Refuse
Containers
01/07/23 -
30/06/24
Levenseat Ltd  SLC/PS/COMENT/20/086 £60,000.00 27/06/2023
Receipt and Processing of
Recyclable Waste 
01/10/23 -
31/03/25
Smurfit Kappa
Recycling  SLC/PS/COMENT/20/086 £60,000.00 27/06/2023
Receipt and Processing of
Recyclable Waste 
01/10/23 -
31/03/25
Hillhouse Quarry
Group,
JH Civil, 
Luddon
Construction, 
Mac Ashphalt,
MAM Contractors,
McLay
Contractors,
Tarmac,
Complete Paving,
Covanburn SLC/PS/COMENT/17/089 £625,000 01/07/2023 Roads Contractor Framework
Non-Contractual
Extension
01/07/2023-
30/09/2023      
115

Page 116

Contractor Contract Reference Value of Contract
Awarded
Date of
Extension Brief Description
Contract
Extension
period 
Active Traffic
Management,
Apex Traffic
management, 
Central Traffic
management,
Class one, 
Markon SLC/PS/COMENT/17/238 £150,000 01/07/2023
Temporary Traffic Management
Framework
Non-Contractual
Extension
01/07/2023 –
30/09/2023 
116