Democracy Spraffa

Agenda Document Pack - Community and Enterprise Resources Committee - 30/05/2023

South Lanarkshire Council · 30 May 2023
Back to Community and Enterprise Resources Committee — 30 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 22 May 2023 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 30 May 2023
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John Anderson,
Ralph Barker, Walter Brogan, Andy Carmichael, Maureen Chalmers, Gerry Convery, Poppy
Corbett, Andrea Cowan, Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland,
Graeme Horne, Cal Johnston-Dempsey, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian
McAllan, Kenny McCreary, Davie McLachlan, Carol Nugent, Helen Toner, David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lynsey Hamilton, Ross
Lambie, Lesley McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott,
David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources Committee
held on 14 March 2023 submitted for approval as a correct record.  (Copy
attached) 
5 - 12 
Monitoring Item(s) 
3 Community and Enterprise Resources – Workforce Monitoring – January
to March 2023
Joint report dated 14 April 2023 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
13 - 18 
Item(s) for Decision 
4 Community and Enterprise Resource Plan 2023/2024
Report dated 10 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
19 - 42 
5 Town Centre and Place Based Investment Programme - Update
Report dated 10 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
43 - 48 
6 Appointment of Public Analysts, Agricultural Analysts and Food
Examiners
Report dated 15 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
49 - 52 
7 On-Request Garden Waste Collection
Report dated 15 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
53 - 56 
8 Community Benefit Funds – Renewable Energy Fund Grant Applications
Report dated 16 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
57 - 60 
9 Community Benefit Funds – Annual Report
Report dated 10 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
61 - 72 
10  South Lanarkshire Council Cemetery Strategy 2023 to 2033
Report dated 15 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
73 - 90 
Item(s) for Noting 
11  UK Levelling Up Fund Update
Report dated 10 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
91 - 94
2

Page 3

12  Contract Award Tanker Applied Roads Surface Coatings to Scottish
Borders Council
Report dated 10 May 2023 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
95 - 98 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Elizabeth-Anne McGonigle
Clerk Telephone: 07385 403101
Clerk Email: elizabeth-anne.mcgonigle@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 14 March 2023 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Gerry
Convery, Councillor Poppy Corbett, Councillor Andrea Cowan, Councillor Margaret Cowie,
Councillor Maureen Devlin (Depute), Councillor Colin Dewar, Councillor Gladys Ferguson-Miller,
Councillor Ross Gowland, Councillor Graeme Horne, Councillor Martin Lennon, Councillor Richard
Lockhart, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Kenny McCreary,
Councillor Davie McLachlan, Councillor Carol Nugent, Councillor David Shearer (substitute for
Councillor Maureen Chalmers), Councillor David Watson 
Councillors' Apologies:
Councillor Andy Carmichael, Councillor Maureen Chalmers, Councillor Joe Fagan, Councillor Cal
Johnston-Dempsey, Councillor Helen Toner 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
C Brown, Environmental Services Manager; F Carlin, Head of Planning and Regulatory Services; K
Carr, Head of Facilities, Waste and Grounds Services; S Laird, Engineering Manager; E Melrose,
Development Officer; I Russell, Construction Unit Manager; G Simpson, Development Adviser
Finance and Corporate Resources
N Docherty, Administration Assistant; L Harvey, Finance Manager; E Maxwell, Human Resources
Business Partner; E-A McGonigle, Administration Officer; L O’Hagan, Finance Manager (Strategy);
M M Wilson, Legal Services Manager 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 13
December 2022 were submitted for approval as a correct record. 
In relation to Item 11, Councillor Shearer enquired about the progress of discussions between
the Council and the Lanark Business Improvement District (BID) on the potential continuation of
the Comfort Scheme pilot in Lanark.  Officers advised that there had been a meeting with the
Chief Executive of the BID in January 2023 and that it was now a matter for its Board to come
back to the Council with a decision.  Councillor Shearer expressed his disappointment at the
lack of progress on this matter. 
The Committee decided: 
(1) that the minutes be approved as a correct record; and 
(2) that the update on the potential continuation of the Comfort Scheme pilot in Lanark be
noted. 
2
5

Page 6

3 Community and Enterprise Resources - Revenue Budget Monitoring 2022/2023 
A joint report dated 8 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted comparing actual
expenditure at 27 January 2023 against budgeted expenditure for 2022/2023 for Community
and Enterprise Resources and providing a forecast for the year to 31 March 2023. 
Following the probable outturn exercise, there was a reported underspend for the Resource of
£0.007 million after approved transfers to reserves of £1.270 million. 
The Resource position as at 27 January 2023 was an overspend of £0.015 million after
approved transfer to reserves, as outlined in Appendix A.  The overspend mainly reflected under
recovery on school meal income.  Details were also provided on proposed budget virements in
respect of Community and Enterprise Resources to realign budgets. 
The Committee decided: 
(3) that the forecast to 31 March 2023 of an underspend of £0.007 million after approved
transfers to reserves, as detailed in Appendix A of the report, be noted; 
(4) that an overspend of £0.015 million as at 27 January 2023 after approved transfers to
reserves, as detailed in Appendix A of the report, be noted; and 
(5) that the budget virements, as detailed in appendices B to F of the report, be approved. 
[Reference: Minutes of 13 December 2022 (Paragraph 3)] 
4 Community and Enterprise Resources - Capital Budget Monitoring 2022/2023 
A joint report dated 22 February 2023 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ Capital Programme 2022/2023 and summarising the
expenditure position at 27 January 2023. 
The revised Capital Programme for 2022/2023, as agreed at the meeting of the Executive
Committee held on 1 February 2023, amounted to £48.444 million, a net increase of £0.174
million and, at 27 January 2023, expenditure was £22.898 million.   
The projected outturn for the financial year was £43.7 million.  This represented an underspend
of £4.744 million and the majority of the variance was due to timing of spend on a number of
projects which resulted in budget required in 2023/2024 rather than 2022/2023. 
The Executive Director (Community and Enterprise Resources) responded to members’
questions on the ongoing maintenance programme for bridges, particularly those in the
Clydesdale area which were vital to communities in the area.   
The Committee decided: 
(1) that the Community and Enterprise Resources’ capital programme of £48.444 million and
expenditure to date of £22.898 million be noted; and 
(2) that the projected outturn of £43.7 million be noted. 
[Reference: Minutes of 13 December 2022 (Paragraph 4) and Minutes of the Executive
Committee of 1 February 2023 (Paragraph 4)] 
6

Page 7

5 Community and Enterprise Resources - Workforce Monitoring – October to
December 2022 
A joint report dated 10 November 2022 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period October to
December 2022:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 10 December 2022 
The Committee decided: that the report be noted. 
[Reference: Minutes of 13 December 2022 (Paragraph 5)] 
6 Revocation of Lanark Air Quality Management Area – South Lanarkshire
A report dated 22 February 2023 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the improvements of air quality within the
Lanark area and the proposed revocation of the Lanark Air Quality Management Area (AQMA). 
The Council had a statutory duty to monitor the quality of air within its area.  This was defined in
the Environment Act 1995 as well as within the Air Quality (Scotland) Regulations 2000 and
2002 as amended.  Monitoring results had to be considered against air quality objectives/targets
and, should those be exceeded, the local authority had to take action to improve the air quality. 
Levels had previously been exceeded in East Kilbride, Rutherglen and Lanark which had
resulted in the declaration of 3 AQMAs. 
An AQMA, which encompassed the whole town of Lanark, had been declared in June 2016 due
to likely breaches of the Nitrogen Dioxide (NO2) hourly mean and annual mean air quality
objectives/targets.  The formal declaration process for the AQMAs and the resultant Air Quality
Action Plan development had been detailed in previous reports to the Committee. 
Environmental Services had supported traffic management and air quality improvement actions
since 2016 and the specific initiatives that had been applied in Lanark were detailed at section
3.4 of the report.  The interventions in Lanark had resulted in improved traffic flow and pollutant
reduction.   
Due to the measured NO2 concentrations declining over recent years, Ricardo Energy and
Environment had been commissioned by the Council to undertake a Detailed Assessment of Air
Quality for NO2 and Particulate Matter (PM2.5) at Lanark.  The executive summary of the
Detailed Assessment was provided in Appendix 1 to the report.  The Detailed Assessment
included a review of pollutant measurements over the previous 10 years as well as a dispersion
modelling study of current and future NO2 and PM2.5 emissions. 
The Council’s Annual Progress Report on Air Quality, together with the Detailed Assessment,
had been submitted to the Scottish Government and Scottish Environment Protection Agency
(SEPA) for appraisal as part of statutory reporting requirements.  Both reports concluded that
the Lanark AQMA should be revoked under Section 83(2) of the Environment Act 1995. The
findings of both reports had been accepted by both SEPA and the Scottish Government and,
therefore, Environmental Services recommended that the Council revoke the Lanark AQMA.
7

Page 8

If the Lanark AQMA was accepted to be revoked, a Revocation Order would be drawn up in
conjunction with Legal Services. The Order would be advertised among statutory consultees
before coming into effect in spring/summer 2023.  The Council had already consulted with SEPA
about the proposed revocation in accordance with the expectation from the Scottish
Government.  Consultation would also have to be conducted with statutory consultees,
businesses, members of the public and other interested parties.  Once the consultation process
had been concluded, the Revocation Order would be submitted to the Scottish Government for
information. 
Where a Revocation Order was accepted, a local authority was expected to develop a Local Air
Quality Strategy to ensure air quality maintained a high profile locally and responded to public
expectations.  Environmental Services sought to develop such a Strategy in 2023/2024 and
would continue air monitoring at the existing automatic air station for a year after revocation of
the AQMA.  The monitoring would be reported through the Annual Progress Report to the
Scottish Government and SEPA on compliance with the national air quality statutory objectives. 
The Environmental Services Manager responded to members’ questions regarding:- 
 whether air quality was monitored in specific areas or across the whole town
 what steps would be taken if there were signs of air quality slipping back to poor quality
 whether similar sustained improvements were being seen in East Kilbride and Rutherglen 
In response to a Councillor Lockhart’s concern regarding whether there was adequate up-to-
date air quality information to ensure the AQMA was not being revoked prematurely in Lanark,
the Environmental Services Manager undertook to give assurance by providing the most recent
monitoring information to him.  Assurance was also provided by relevant safeguarding measures
that were in place, which included the consultation that had been conducted with SEPA and the
local consultation that would follow. 
In response to a member’s question regarding additional funding of £0.347 million received from
the Scottish Government in 2022/2023 for clean air initiatives, as reported at the Executive
Committee meeting of 21 September 2022, the Environmental Services Manager undertook to
provide a report to a future meeting of the Committee on progress made with those funds,
together with an update on funding received in 2023/2024. 
The Committee decided: that the Lanark AQMA be revoked. 
[Reference: Minutes of 4 February 2020 (Paragraph 11) and Minutes of the Executive
Committee of 21 September 2022 (Paragraph 5)] 
7 Zero Carbon Indoor Multi Sports Facility Proposal at Strathaven Rugby Club
A report dated 22 February 2023 by the Executive Director (Community and Enterprise
Resources) was submitted:- 
 providing information on a planning application submitted by Strathaven Rugby Club
(SRC) to add an indoor training facility (“the Facility”) to their current establishment
 seeking approval to support the Facility with funds from the Strathaven Community Sports
and Sports Facilities Fund (“the Funds”) created in accordance with an agreement under
Section 75 of the Town and Country Planning (Scotland) Act, subject to an appropriate
legal agreement being entered into between the Council and SRC 
SRC had submitted a planning application to the Council in September 2022 for the Facility as
part of its continued development of the club.  Funding had been requested from the Council to
help support the Facility.
8

Page 9

The Strathaven Community and Sports Facility Fund was established as part of an agreement
made under Section 75 of the Planning Act between the Council and Henry Jardine Patterson
and Mrs Jean Watson Patterson, registered in the Land Register of Scotland (“the Section 75
Agreement”) on 23 December 2014.  This agreement had been pursuant to Planning Application
EK/12/0003.  The policy tests required to be met in regard to the Section 75 agreement and
developer contributions were detailed at section 5.4 of the report. 
SRC’s planning application for the Facility stated the purpose of its organisation was to provide
sporting facilities for a large rural community and its aim was to provide an indoor training facility
which could accommodate training and general exercise in all weathers.  The Facility would be
built in line with carbon neutral standards which complied with the government’s carbon net zero
by 2035.  Further details on the zero carbon indoor multi-sports Facility were provided in section
4 of the report. 
SRC had advised that initial quotes for the build ranged from £920,000 to £1.1 million and that
the programme would take 28 weeks from commencement of the construction.  Funding was
being sought from the Scottish Rugby Union and other fund matching opportunities would also
be identified including Virador, Sports Scotland, Banks Renewables and the National Lottery.   
The total and final balance of Council funds held in the Fund was £387,473 and SRC had
requested that this Fund be released to contribute towards the Facility.  The Section 75
agreement provided that the Fund would be administered and used by the Council in
consultation with the initial owner of the East Overton land (Initial Owner).  The Initial Owner had
already been consulted in relation to the proposal and supported the application for the Facility. 
It was proposed that releasing the monies from the Fund for this project would be underpinned
by an appropriate legal agreement which would include the conditions that SRC would need to
adhere to in order that the funds could be accessed, which included demonstrating that the
project would benefit the wider community.  The Council, through the legal agreement, would
ensure the monies would be released in phases and through approval of work stages.  There
would be a cap on the amount released and, if the project did not adhere to set conditions,
monies would be revoked.  The Executive Director (Community and Enterprise Resources), in
consultation with the Head of Administration and Legal Services, would conclude the legal
agreement under delegated authority. 
The Head of Enterprise and Sustainable Development Services responded to members’
questions on various aspects of the report.   
The Committee decided: 
(1) that, subject to the grant of the planning application on acceptable terms to the Council,
the release of the Funds totalling £387,473 to support the Facility be approved; 
(2) that it be noted that the Funds would not be released until an appropriate legal agreement
had been concluded between the Council and SRC, which would cover, amongst other
things, the:-
 level and phasing of payments of the Funds
 requirement that the Facility should serve the local community at large
 ability for the Council to ‘clawback’ the Funds for use on alternative community
projects if the Funds were not used within a certain timescale 
(3) that authority be delegated to the Executive Director (Community and Enterprise
Resources), in consultation with the Head of Administration and Legal Services, to
conclude the legal agreement.
9

Page 10

8 Ash Dieback Disease Programme – Arboriculture Operatives (Trainee)
A joint report dated 24 February 2023 by the Executive Directors (Community and Enterprise
Resources) and (Finance and Corporate Resources) was submitted:- 
 updating the Committee on a programme of work required on Ash Dieback Disease (ADD)
following allocation of capital funding
 seeking approval for 3.0 FTE Arboriculture Operatives (Trainees) to be added to the
establishment for a fixed-term of 12 months 
ADD was considered the most significant tree disease to affect broadleaved trees in the UK
since Dutch Elm Disease gained prominence in the 1960s.  It had spread rapidly and only a
small fraction of trees had proved to be resistant due to genetic factors which gave them
tolerance to the disease.  The disease, which was incurable, was caused by the fungal
pathogen Hymen scyphus fraxineus, and affected just ash species.  Data from Europe
suggested that it would lead to the decline and death of 50% to 75% of ash trees in Scotland
over the next 2 decades and had the potential to infect more than 75 million ash trees across the
country.  ADD was first recorded in the UK and South Lanarkshire in 2012. 
The national cost of managing trees with ADD, which could include monitoring, pruning and,
where necessary, felling, was difficult to calculate but had been estimated to exceed £2.5 billion
across the UK in the next 10 years.  Scotland’s costs would potentially be in the region of £200
million in the same period.  The Association of Public Service Excellence (APSE) estimated the
economic cost at £14.8 billion, which was 3 times as much as estimates for Dutch Elm Disease
in the 1960s and 1970s due to the quantity of ash trees. 
The management of ADD was proving a real challenge for tree managers as to whether trees
would be felled or allowed to stand so that resistance could be developed to the disease and,
therefore, species that were reliant upon the ash for their home would be protected. 
The Council, through the Arboriculture Team, had participated in a number of national initiatives
with key stakeholders, such as The Forestry Commission, the Tree Council and the Scottish
Government, to develop policy and processes in response to the ADD problem.  The Council
had included ADD in the corporate risk register as well as the Sustainable Development and
Climate Change Strategy. 
A pilot investigation had been undertaken following funding that had been allocated over the last
year.  This had identified an initial programme of work to further quantify the scale of the issue
and to respond  to immediate concerns.  Additional resources would be required to:- 
 address the challenges in the arboriculture sector
 allow the Grounds Service to reprofile its current workload
 address succession planning concerns within the establishment   
It was, therefore, proposed that the following temporary posts be added to the establishment on
a fixed-term basis for 12 months, as detailed in section 5 of the report:- 
 3.0 FTE posts of Arboriculture Operative (Trainee Temporary) on Grade 1, Level 2, SCP
22-23 (£22,011 to £22,282) 
Funding of £0.500 million had been allocated from the 2023/2024 Capital Programme to deliver
this programme of work and would be allocated as follows:- 
 £0.087 million on staffing
 £0.413 million on vehicles, equipment, materials and other contractor costs 
The Head of Facilities, Waste and Grounds Services responded to members’ questions on
various aspects of the report.
10

Page 11

The Committee decided: 
(1) that contents of the report be noted; and 
(2) that it be approved that 3.0 FTE Arboriculture Operatives (Trainees) be added to the
Grounds Services’ establishment for a fixed-term of 12 months, as detailed in section 5 of
the report. 
9 Community and Enterprise Resource Plan – Quarter 2 Progress Report 2022/2023 
A report dated 21 February 2023 by the Executive Director (Community and Enterprise
Resources) was submitted on the Community and Enterprise Resource Plan Quarter 2 Progress
Report 2022/2023 for the period 1 April to 30 September 2022. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG) which indicated that an action had been completed. 
Details were provided on:- 
 progress made in implementing the priority projects identified in the Resource Plan Quarter
2 2022/2023, as detailed in Section 5.2 and attached as Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in Section 5.3 of the report
 areas for improvement and associated management actions, as detailed in Section 5.4 of
the report
 the additional scrutiny of reporting the updated status of those measures identified as
‘report later’ at Quarter 4 2021/2022, as detailed in Section 5.5 and attached as Appendix
3 to the report 
The Committee decided: 
(1) that the Community and Enterprise Resource Plan Quarter 2 Progress Report 2022/2023, 
attached as Appendix 2 to the report, be noted; 
(2) that the key achievements made by the Resource up to Quarter 2, as detailed in
paragraph 5.3 of the report, be noted; and 
(3) that the areas for improvement and associated management actions, as detailed in
paragraph 5.4 of the report, be noted. 
[Reference: Minutes of 4 October 2022 (Paragraph 11)] 
10 Urgent Business 
There were no items of urgent business. 
11

Page 12

12

Page 13

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Finance and Corporate Resources)
and Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – January to March 2023 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for January to March 2023 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for January to March 2023 relating
to Community and Enterprise Resources be noted:- 
 attendance statistics;
 occupational health;
 accident/incident statistics;
 discipline, grievance and Dignity at Work cases;
 analysis of leavers and exit interviews; 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Community and
Enterprise Resources provides information on the position for January to March
2023. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of March 2023 for
Community and Enterprise Resources. 
The Resource absence figure for March 2023 was 7.3%, this figure has increased by
0.4% when compared to last month and is 0.9% higher than the Council-wide figure. 
Compared to March 2022, the Resource absence figure has decreased by 2.9%. 
Based on the absence figures at March 2023 and annual trends, the annual average
absence for the Resource for 2022/2023 is 6.9%, compared to a Council-wide
average figure of 5.7%.
3
13

Page 14

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, which include medical examinations and
physiotherapy, overall, 332 referrals were made this period.  This represents a
decrease of 26 when compared with the same period last year.   
4.3. Accident/Incident Statistics 
There were 45 accidents/incidents recorded within the Resource this period, a
decrease of 6 when compared to the same period last year. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 44 disciplinary hearings were held within the Resource, an
increase of 30 when compared to the same period last year.  During the period no
appeals were heard by the Appeals Panel and 1 appeal was withdrawn.  No
grievance hearings were raised within the Resource, this figure has decreased by 3
when compared to the same period last year.  No Dignity at Work complaints were
raised within the Resource, this figure has decreased by 2 when compared to the
same period last year. 
4.5. Analysis of Leavers (Appendix 2) 
There were a total of 37 leavers in the Resource this period eligible for an exit
interview. This figure has decreased by 9 when compared with the same period last
year.  Ten exit interviews were conducted in this period, this figure remains
unchanged when compared to the same period last year. 
4.6. When processing an employee termination, managers were asked to identify
whether they intended to replace the employee who had left the Council.  If they
indicated that they did not intend to replace the employee, they were asked to select
from the following options:- 
 plan to hold for savings
 fill on a fixed term basis pending savings
 transfer budget to another post
 end of fixed term post 
4.7. Appendix 2a provides a breakdown of vacant posts and whether these are being
replaced or held for savings.  In the period January to March 2023, 140 (92.60 FTE)
employees in total left employment.  Managers indicated that 115 posts (67.60 FTE)
were being replaced, 24 posts (24.00 FTE) were due to the end of a fixed term
contract and 1 post (1.00 FTE) was being held pending a service review. 
5. Employee Implications
5.1. There are no implications for employees arising from the information presented in
this report. 
6. Financial Implications
6.1. All financial implications are accommodated within existing budgets. 
14

Page 15

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
8. Other Implications
8.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
14 April 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources Committee – 14 March 2023 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:-   (Tel: 01698 454647)
E-mail:-  Elaine.Maxwell@southlanarkshire.gov.uk 
15

Page 16

2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
2020 /
2021
2021 /
2022
2022 /
2023
% % % % % % % % % % % %
April 3.1 2.3 4.4 April 5.3 5.7 7.3 April 5.0 5.2 6.9 April 4.4 4.3 5.6
May 2.4 2.7 3.9 May 4.3 6.4 6.8 May 4.0 5.9 6.3 May 3.1 4.9 5.4
June 1.6 2.8 3.5 June 4.0 6.6 7.2 June 3.6 6.0 6.7 June 2.7 4.7 5.3
July 1.8 2.9 3.9 July 3.6 5.3 5.9 July 3.4 4.9 5.6 July 2.3 4.0 4.6
August 1.7 2.9 3.4 August 4.9 6.4 6.6 August 4.4 5.9 6.1 August 3.1 4.7 4.4
September 1.6 3.4 3.1 September 5.8 8.2 7.9 September 5.1 7.5 7.1 September 4.2 6.4 5.4
October 3.1 3.8 5.1 October 6.3 7.9 7.5 October 5.8 7.3 7.1 October 4.8 6.3 5.8
November 3.6 3.5 4.2 November 7.1 8.0 8.3 November 6.6 7.3 7.7 November 5.8 6.9 6.5
December 3.1 4.2 3.7 December 6.4 8.0 8.8 December 5.9 7.4 8.0 December 5.6 6.9 7.0
January 3.4 3.6 2.6 January 6.0 9.6 7.4 January 5.6 8.6 6.7 January 4.8 7.0 5.8
February 2.8 4.4 3.6 February 6.5 9.5 7.4 February 5.9 8.7 6.9 February 4.8 6.6 5.9
March 2.6 6.0 3.9 March 6.8 11.0 7.9 March 6.2 10.2 7.3 March 4.9 7.9 6.4
Annual Average 2.6 3.5 3.8 Annual Average 5.6 7.7 7.4 Annual Average 5.1 7.1 6.9 Annual Average 4.2 5.9 5.7
519 2843 3362 16090No of Employees at 31 March 2023 No of Employees at 31 March 2023 No of Employees at 31 March 2023 No of Employees at 31 March 2023
Appendix 1
Absence Trends - 2020/2021, 2021/2022 & 2022/2023
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
16

Page 17

COMMUNITY AND ENTERPRISE RESOURCES
Jan - Mar Jan - Mar
2022 2023
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 119 87
REFERRALS TO COGNITIVE BEHAVIOUR THERAPY 0 0
TOTAL 358 332
Jan - Mar Jan - Mar
2022 2023
Specified Injuries* 2 1
Over 7 day absences 5 7
Over 3 day absences** 3 1
Minor 32 21
Near Miss 2 7
Violent Incident:  Physical**** 3 6
Violent Incident:  Verbal***** 4 2
Total Accidents/Incidents 51 45
Jan - Mar Jan - Mar
2022 2023
Total Number of Hearings 14 44
Total Number of Appeals 1 0
Time Taken to Convene Hearing January - March 2023
0-3 Weeks 4-6 Weeks Over 6 Weeks
23 15 6
Jan - Mar Jan - Mar
2022 2023
Number of Grievances 3 0
Number Resolved at Stage 1 1 0
Number Resolved at Stage 2 2 0
Jan - Mar Jan - Mar
2022 2023
Number of Incidents 2 0
Number Resolved at Formal Stage 2 0
Jan - Mar Jan - Mar
2022 2023
Career Advancement 0 5
Poor Relationship with Manager/Colleagues 1 2
Moving Outwith Area 1 0
Personal Reasons 1 1
Travelling Difficulties 0 1
Further Education 1 0
Childcare/caring responsibilities 1 0
Other 5 1
Number of Exit Interviews conducted 10 10
Total Number of Leavers Eligible for Exit Interview 46 37
Percentage of interviews conducted 22% 27%
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or
Over 7-day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures,
where applicable, to provide the "Total Minor" figures.
ANALYSIS OF REASONS FOR LEAVING
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
RECORD OF DIGNITY AT WORK
CAUSE OF ACCIDENTS/INCIDENTS
101
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of
sight, serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head
injury, a chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results
in a period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does
not lead to injury of persons, damage to property, plant or equipment but may have done so in
different circumstance.
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
"Total Specified" figures.
100
APPENDIX 2
124 129
14 16
17

Page 18

FTE H/C FTE H/C
Terminations/Leavers 92.60 140 338.56 575
Being replaced 67.60 115 281.09 513
Filling on a temporary basis 0.00 0 0.00 0
Plan to transfer this budget to another post 0.00 0 0.00 0
End of fixed term contract 24.00 24 56.46 61
Held pending service Review 1.00 1 1.00 1
Plan to remove for savings 0.00 0 0.00 1
Appendix 2a
Reason Jan - Mar 2023 Cumulative total
18

Page 19

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resource Plan 2023/2024 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 present the Community and Enterprise Resource Plan 2023/2024 for approval
and note the monitoring arrangements
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Resource Plan 2023/2024, attached as Appendix 1, be approved;
(2) that the Resource Plan 2023/2024 be uploaded onto the Council’s website
following consideration by this Committee; 
(3) following Committee approval, all Resource Plans will be presented to
Executive Committee on 21 June 2023, for noting; and
(4) that Progress Reports on the Resource Plan 2023/2024 be provided at
Quarter 2 and Quarter 4 to future meetings of this Committee. 
3. Background
3.1. The Resource Plans for 2023/2024 were prepared in line with the Corporate
Resource Planning guidance. 
3.2. The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which the Resource operates
and establishes actions and measures for the year ahead based on the priorities and
outcomes set out in the Council Plan Connect 2022 to 2027. 
3.3. Performance management is a keystone of Best Value and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is one part
of the Council’s framework for planning and budgeting and demonstrates how this
leads to effective front-line service delivery. 
3.4. As part of this framework, the Resource Plan reflects the aspirations of the Council
Plan and the Community Plan as well as being complemented by the details of
individual Service, Business and other Plans.  Ultimately, these details are included
in the key work objectives of individual officers.  This demonstrates the ‘Golden
Thread’ of performance management which ensures a clear understanding of the
Council’s vision, values, priorities and outcomes at all levels. 
4
19

Page 20

3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams, Resource Committees and the Performance and Review Scrutiny Forum. 
The focus has been on reporting progress on Council outcomes, statutory
performance indicators, other key performance measures and high-level Resource
outcomes. Progress reports are provided at Quarter 2 and Quarter 4 to this
Committee. 
3.6. In preparing the Plan, account has also been taken of the need to ensure a robust
response to Risk Management and Control.  Risks associated with delivery of the
actions in this Resource Plan have been identified and evaluated and are listed in
the Resource Risk Register.  Where necessary, controls or further actions to mitigate
these risks have been agreed.  Such actions are tracked through the Resource Risk
Control Plan which is kept under review by the Risk Sponsor for the Resource. 
3.7. Following approval at individual Resource Committees, all Resource Plans will be
presented, as a pack, to Executive Committee on 21 June 2023, for noting. 
4. Resource Plan 2023/2024
4.1. The Resource Plan 2023/2024 is attached as Appendix 1 and is structured around
the following headings: - 
1. Introduction 
2. Key areas for the year ahead 
3. Resource outcomes 
4. Measures and actions 
5. Resourcing the Plan 
4.2. Resource Outcomes 2023/2024
4.2.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2023/2024.  To support these outcomes, the Resource has
developed performance measures in an action plan which is set out in section 4 of
the Resource Plan.  Key or strategic measures will be included in the Council Pan
Connect Progress Reports 2023/2024, with the rest being monitored and reported at
Resource level. 
4.3. Monitoring and reporting
4.3.1. As part of the performance management arrangements, the Committee will receive a
mid-year update of progress on the measures in the Resource Plan covering the
period April 2023 to September 2023 (Quarter 2) as well as an end of year progress
report covering the full year April 2023 to March 2024 (Quarter 4). 
5. Employee Implications
5.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and, in turn, the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The outcomes within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and, longer term, within the framework of the Council’s
approved Financial Strategy.
20

Page 21

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
7.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2023/2024. 
8. Other Implications
8.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
David Booth
Executive Director (Community and Enterprise Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022 to 2027 
Previous References
 None 
List of Background Papers
 Council Plan 2022-2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Gillian Simpson (Development Adviser)
E-mail:- gillian.simpson@southlanarkshire.gov.uk 
21

Page 22

22

Page 23

1 
Community and Enterprise Resources 
Community and Enterprise Resource Plan 2023 – 2024 
4
23

Page 24

2 
Section Contents 
1.0   Introduction 
2.0   Key areas of focus for the year ahead 
3.0   Resource outcomes 
4.0   Measures and actions 
5.0   Resourcing the Plan
24

Page 25

3 
Section One – Introduction 
I am pleased to introduce our Resource Plan for 2023-24 which sets out our intended outcomes
and priorities for the coming year. This is the main annual business planning document for the
resource. It reflects the council’s key priorities as set out in the Council Plan ‘Connect’ and
provides an overview of the resource’s main areas of activity. 
Our resource comprises the following four service areas – facilities, waste and grounds
services; roads, transportation and fleet services; planning and regulatory services; and
enterprise and sustainable development.  The resource employs 3,413 people who together
provide a wide range of services for local communities, including: 
 delivering key services within schools and council premises, including cleaning, catering,
receptionist, janitorial, concierge, and crossing patrol services
 keeping our streets clean and maintaining and developing public parks, open spaces, tree
stock, fixed play areas, sports fields, golf courses, allotments, and food growing
opportunities
 collecting and disposing of waste and encouraging recycling
 managing and maintaining the councils’ cemeteries and crematorium, providing
bereavement services, and ensuring the provision of burial ground 
 maintaining our roads and transportation network to support safe and effective transport,
and promoting active travel
 procuring and managing the council’s vehicle fleet, including refuse collection, roads
maintenance, street sweeping and passenger transport
 providing planning and building standard services which guide and control physical
development and land use in the area, ensure the health and safety of persons in or about
buildings, ensure the conservation of energy and the achievement of sustainable
development
 protecting public health through the delivery of environmental health services
 providing trading standards to protect consumers and communities 
 promoting economic development and delivering support for local businesses
 supporting town centres and physical regeneration
 leading the council in developing and promoting sustainability, supporting the transition to a
net zero carbon economy, and addressing climate change, and
 leading the council in promoting and developing a fair, healthy, and sustainable food
system 
The resource also has a significant role to play in managing the relationship between the
council and South Lanarkshire Leisure and Culture (SLLC).  SLLC deliver leisure and cultural
services on behalf of the council and promote the health and wellbeing of South Lanarkshire
residents through libraries, cultural venues, museum, arts centres, indoor and outdoor sports
and leisure centres, community halls and country parks. 
The Resource Plan is an important element of the councils’ performance management
arrangements and is complemented by the details of individual service plans and other key
business plans and strategies.  During 2023-24 services will continue to be involved in a series
of council-wide transformational reviews to generate efficiencies which will inform how our
services are shaped and delivered in the future. 
David Booth
Executive Director
Community and Enterprise Resources 
25

Page 26

4 
Section Two – Key areas of focus for the year ahead   
2.0. Overview 
The resource has identified the main challenges, risks and new developments which will
have significant impact on the delivery of services in the coming year. These are outlined
briefly below. 
2.1. Cost of Living Crisis The UK is experiencing the worst cost-of-living crisis in 40
years.  With inflation soaring into double figures both the UK and the Scottish Government
have formally recognised the severity of the crisis and have deployed emergency
measures to help mitigate the effects of rising costs. While all sectors of society are
seeing prices rise the impacts are greatest for those on the lowest incomes.  The council
recognises the immense pressures being faced by households across South Lanarkshire
and acknowledges the potential for additional demands on council services.  The council
has identified a range of new and existing support which can help households manage
scarce resources and services will continue to explore all avenues to support the most
vulnerable in the year ahead. 
While doing all we can to support our communities in these difficult times, the council
recognises that inflationary pressures will also present significant challenges for council
services as budgets are increasingly squeezed by rising costs. 
2.2.  Sustainable Development and Climate Change The council
acknowledges the serious and immediate threat of climate change and is committed to
accelerating the pace of action in response to the climate emergency and in Scotland’s
transition to a net-zero and climate resilient society and economy. It is expected that, as a
public body, the council leads by example and uses its role to influence area-wide climate
change action and sustainability.  The Sustainable Development and Climate Change
Strategy and action plan sets out how the council aims to develop sustainably and tackle
climate change over the five year period from 2022 – 2027 and beyond. 
2.3.  Economic Development and Renewal The UK, Scottish, Glasgow City
Region and South Lanarkshire economies are all facing real challenges following the
global pandemic, our country’s new international trading position, the war in Ukraine and
the climate emergency, all of which impact our lives now and in the foreseeable future. 
Economic recovery in South Lanarkshire will incorporate the principles of community
wealth building and be framed around three key themes of sustainable development:
People, Place and Business (or social, physical, and economic regeneration). These
themes align council and pan-Lanarkshire activity with local, national and regional
strategies, delivering the collaborative approach required to achieve sustainable and
inclusive economic growth.  The Economic Strategy (2022-27) sets out the key priorities
and actions for the council and aims “to make South Lanarkshire a flourishing, green,
dynamic and equitable place for all”. 
2.4.  Fair, Healthy and Sustainable Food System The council is committed to
improving the lives and prospects of everyone in South Lanarkshire through the
development of a Good Food Council; where food is celebrated, supports healthy life and
wellbeing, is affordable and accessible to all, encourages a fair and inclusive food
economy, has limited impacts on the environment and climate change, and promotes
animal welfare. The Good Food Strategy (2020-2025) which is aligned with the national
priority to make Scotland a Good Food Nation, provides a framework for actions to
progress towards this vision. Community and Enterprise Resources has a key role in
26

Page 27

5 
monitoring and implementing the strategy together with other resources and in
collaboration with partners and third sector organisations. 
2.5. Circular Economy At the time of writing, the Scottish Government is currently
consulting on proposals for a Route Map to deliver a circular economy in Scotland
(‘Delivering Scotland’s circular economy: A Route Map to 2025 and beyond), and on
proposals for legislation in a Circular Economy Bill.  The proposed Route Map will set out
how we will reach 2025 waste and recycling targets and achieve a long-term goal of net
zero by 2045. The outcome of this consultation will influence the decisions the council
makes in over the next 5-10 years.   
2.6.  Glasgow City Region City Deal As part of the City Deal, the resource is leading
the delivery of three major transportation projects being undertaken to boost South
Lanarkshire’s access to the rest of Scotland.  The Cathkin Relief Road in Rutherglen /
Cambuslang is complete and the Greenhills Road project in East Kilbride substantially
complete and open. Proposals in relation to Stewartfield Way are being developed
through the preparation of the outline business case. 
The City Deal is also helping to deliver private housing led development in some of its
Community Growth Areas, including new schools and community facilities. 
2.7. UK Government Shared Prosperity Funding (UKSPF) Following the UK
withdrawal from the European Union, the UK Government outlined proposals to replace
EU funding with national funds to address structural and economic imbalances and to aid
the public and private sector in delivering transformational change in communities. The
delivery of the 3-year UK Shared Prosperity Funding (UKSPF) commenced in 2022.
Economic Development Officers will work with council services and external partners on
delivery of the UKSPF to maximise economic and community outcomes. 
2.8. Health and Wellbeing This is a cross-cutting theme across Community and
Enterprise Resources and covers a wide range of activities, from promoting healthy eating
(via the Good Food Strategy and the provision of school meals), to the positive
contribution that our partners SLLC make in ensuring inclusive access to sport, leisure
and culture across our communities. Furthermore, the environmental health service
promotes health protection practices and regulates public health across South
Lanarkshire. Access to good quality greenspace and safe and accessible active travel
routes are also a key priority for the resource, encouraging physical exercise and
improving the wellbeing of our communities. The continuing preparation of the council’s
Open Space Strategy will contribute to achieving these aims. In addition, the Planning
Service and Economic Development team are working in collaboration with the
Community Engagement team and NHS Lanarkshire on the Shaping Places for Wellbeing
pilot project in Rutherglen, which seeks to address long standing health inequalities and
tackle climate change issues in the town. 
2.9.  Legislative and Policy Changes New and revised legislation will also impact on
the work of the resource during 2023-24, including: 
 Climate Change Act (2019) - commits Scotland to net-zero greenhouse gas
emissions by 2045, with interim targets of 75% by 2030, 90% by 2040 (against 1990
baseline).  The Scottish Government also has an ambition to be carbon neutral by
2040.  The council, through the Sustainable Development and Climate Change
Strategy Action Plan, will develop a route map for reducing the council’s direct and
indirect carbon emissions. 
27

Page 28

6 
 The Planning (Scotland) Act 2019 – the Scottish Government’s National Planning
Framework 4 is due to be adopted in early 2023 when it will become part of the
Development Plan alongside the Council’s Local Development Plan 2. Key
outcomes include achieving sustainable development, tackling the climate and
nature emergencies, encouraging high quality places, promoting 20 minute
neighbourhoods, delivering a green economic recovery and improving the health
and wellbeing of the population. It will be a primary consideration when determining
planning applications. In addition, the Act introduces changes to the way Local
Development Plans are prepared with particular emphasis on empowering
communities. Work will formally start on LDP3 this year and the Open Space
Strategy (also a new statutory duty under the Act) will be progressed. 
 Building (Scotland) Regulations – changes to the Building Regulations intended
to reduce emissions and improve the energy performance of buildings will be
introduced in early 2023.
 Transport (Scotland) Act 2019 - designed to help make Scotland’s transport
network cleaner, smarter and more accessible. It provides local transport authorities
with powers to establish and operate municipal bus companies and for local
authorities to manage vehicle emissions via the establishment of Low Emission
Zones. The Act requires the production of a national strategy in relation to transport
and this has been published.  Themes in the National Transport Strategy include
economic growth; carbon; equality; health/active travel.  A balance will need to be
struck between driving inclusive economic growth while achieving zero carbon
ambitions. Another key provision of the Act is to prohibit the parking of vehicles on
pavements, prohibit double parking and prohibit parking adjacent to dropped
footways and to provide local authorities with powers to enforce these
prohibitions.  This provision will have significant employee and financial resourcing
issues and timescales. Details of how the Act will be implemented in relation to its
provisions are awaited. 
 Deposit Return Scheme (2020) – introduces a deposit return scheme for single-
use drinks containers, to help improve quality and quantity of recycling, reduce litter
and achieve our climate change targets. This is expected to be implemented during
2023-24 and may require a review of our waste collection services to determine the
level of impact in terms of: household residual waste tonnages and household
recycling rates; and to determine whether collection routes and frequencies need to
be reviewed as a consequence of residents’ change in behaviour.
 Free School Meals Roll Out - the Scottish Government is committed to extending
free school meal provision to pupils in P6 and P7, however the timescales for this
have still to be confirmed.     
 EU Food Imports - phased implementation of checks on EU food imports were due
to commence in 2021 and implementation has been delayed by UK Government. 
Food Standards Scotland (FSS) has indicated new Border Control Points in
Scotland will not be ready and operational, which could require inland (point of
destination) import controls. The central location and good transport links of South
Lanarkshire is likely to mean the council will be asked to carry out import controls. It
is not possible to quantify the potential increase in workload at this time and could
lead to a reprioritisation of work during 2023-24. 
28

Page 29

7 
Section Three – Resource Outcomes 
3.1. Resource Outcomes
Community and Enterprise Resources has established the following Resource Outcomes
to support the delivery of Connect Outcomes in 2023-24. 
Connect
Outcomes Resource Outcomes  
Communities and
Environment 
 High-quality streets, parks and other public areas ensures
South Lanarkshire is a place where people want to live, work,
visit and invest
 Communities are encouraged and supported to reduce, re-
use and recycle their waste
 The council addresses climate change by reducing carbon
emissions, protecting our natural environment, adapting to
the impacts of climate change, and acting sustainably
 The council supports and promotes a fairer, healthier, and
more sustainable food system 
 Communities are well connected 
 All roads, footways, cycle routes, bridges and associated
infrastructure are safe and fit for purpose
 Road and transportation infrastructure supports new
development, enables use of public transport and
encourages active travel
 The 20-minute neighbourhood principle is established in our
communities to make our places more sustainable and
liveable.
Education and
Learning 
 No resource outcomes for this Connect outcome 
Health and
Wellbeing 
 Public health is safeguarded through an effective
environmental regulation and enforcement service
 All school and nursery children have access to nutritious
school meals 
 Health inequalities are addressed through collaboration with
local communities and partners
 All residents have the opportunity to access cultural, leisure
and outdoor recreational activities to help improve their
wellbeing and quality of life
Children and
Young People 
 No resource outcomes for this Connect outcome 
Housing and Land   Vacant, derelict and contaminated land is brought back into
productive use
 Appropriate supply of housing land (including affordable
housing) is maintained
Our Economy   South Lanarkshire is an attractive place to start, grow and
locate a business
 Economic development and growth in South Lanarkshire are
fair, inclusive, sustainable and low carbon
 Thriving town and neighbourhood centres provide a focal
point for local communities 
 Physical development and land use in the area is enabled,
guided and controlled to help facilitate economic growth  
 Consumers and communities are protected through an
effective trading standards service 
29

Page 30

8 
3.2. Delivering the Plan and achieving Best Value
In working towards the six outcomes, the council aims to continually improve and ensure
effective and efficient use of resources, and our business will be conducted with integrity,
transparency and will operate to the highest standards. Community and Enterprise
Resources has established the following resource outcomes to support Delivering the
Plan and achieving Best Value. 
Delivering the
Plan and
achieving Best
Value
 Customers experience high quality and improving council
services
 The council demonstrates high standards of governance and
sound financial stewardship
 The workforce has the skills, flexibility and capacity to deliver
the council’s priorities
 Digital and ICT services meet the needs of the council and its
customers 
30

Page 31

9 
Section Four – Measures and actions 
4.0. Performance measures and action plan 
This section of the Resource Plan is divided into two parts: part (a) sets out our main
performance measures against our outcomes; and part (b) describes the key actions we
will take in the coming year to respond to the challenges ahead and improve services and
outcomes. 
4.a. How we will measure our performance
The ongoing effects of COVID-19 continue to have an impact on the performance of some
services. The table below shows our performance measures, with data for the last two
years, the target for 2023-24 and additional context for the targets is detailed within the
note’s column where applicable. 
Resource Outcome: High-quality streets, parks and other public areas ensures South Lanarkshire
is a place where people want to live, work, visit and invest
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
1. Percentage of
streets found to be
acceptable during
Litter Monitoring
System surveys      
(Locally set target)
92.1% LGBF Data
for 2022-23
due January
2024
More than
2022-23
figure
01.09 Facilities,
Waste and
Grounds
Target: more
than
previous year.
2. Land Audit
Management
System grounds
maintenance score      
(Locally set target) 
71.3 72.0 72.0 C01.09 Facilities,
Waste and
Grounds
Target to remain
at 72.0.       
Resource Outcome:  Communities are encouraged and supported to reduce, re-use and recycle
their waste
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
3. Percentage of total
household waste
that is recycled in
2023      
(Locally set target)
41.5%
(2021)
41.2%
(2022)
50% C01.14 Facilities,
Waste and
Grounds
Target to remain
at 50%.
4. Percentage of
household waste
sent to landfill in
2023      
(Locally set target)
8.66%
(2021)
1.84%
(2022)
Less than
10%
C01.06 Facilities,
Waste and
Grounds
Target to remain
at 10%.       
31

Page 32

10 
Resource Outcome:  The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate change, and acting sustainably
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
5. Reduction in the
council’s carbon
emissions achieved
by March 2024
(buildings, waste,
street lighting,
transport)      
(Locally set target)
17.0% 2022-23
data will be
available in
July 2023 
Less than
2022-23
figure
01.13 Enterprise
and
Sustainable
Development
Target:
reduction on the
previous year 
Resource Outcome:  Communities are well connected
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
6. Percentage of
properties with
Superfast
Broadband
>30Mbps      
(Locally set target)
97.0%  97.3%  99% C01.07 Enterprise
and
Sustainable
Development
Target has been
increased
7. Percentage of
properties with Full
Fibre connection 
(Locally set target)
21.9% 32.6%  33% 01.07 Enterprise
and
Sustainable
Development
Target has been
increased 
Resource Outcome: All roads, footways and bridges and associated infrastructure are safe and fit
for purpose
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
8. Percentage of our
road network that
should be
considered for
maintenance
treatment      
(Locally set target)
29.7%
(2020-
2022)
30.8%
(2021-
2023)
Less than
30.8%
C01.10 Roads,
Transportation
and Fleet
Target:
improvement on
the previous
year
9. Number of road
casualties in South
Lanarkshire during
2023      
(Locally set target)
254
(2021)
279
(2022)
Less than
279
C01.01 Roads,
Transportation
and Fleet
Target:
improvement on
the previous
year 
Resource Outcome:  Public health is safeguarded through an effective environmental regulation
and enforcement service
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
10. Broad compliance
with food law
statutory
requirements
secured in premises      
(Locally set target)
93.0% 96.0% 85.0% 01.11 Planning and
Regulatory
Services
Target to remain
at 85%       
32

Page 33

11 
Resource Outcome: All school and nursery children have access to nutritious school meals 
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
11. Level of primary
school meal uptake
(as proportion of to-
tal primary school
meals which could
be taken up over the
period)      
(Locally set target)
58% 66%  60% 03.03 Facilities,
Waste and
Grounds
Target has been
increased
12. Level of secondary
school meal uptake
(as proportion of
total secondary
school meals which
could be taken up
over the period)      
(Locally set target)
36% 38%  38% 03.03 Facilities,
Waste and
Grounds
Target has been
increased       
Resource Outcome: South Lanarkshire is an attractive place to start, grow and locate a business 
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
13. Number of new
South Lanarkshire
business starts
supported by
Business Gateway      
(Locally set target)
N/A 520 500 C06.08 Enterprise
and
Sustainable
Development
Target is 50% of
Business
Gateway pan-
Lanarkshire
contract target
14. Number of business
support
interventions per
annum by Economic
Development
(grants, loans or
advice)      
(Locally set target)
2,679 1,615 1,200 C06.08 Enterprise
and
Sustainable
Development
Target has been
reduced from
1,500 to 1,200
as new start-ups
are now
reported
separately
15. Number of jobs
created or sustained
as a direct result of
Economic
Development
intervention       
(Locally set target)
1,095 1,256  500 C06.08 Enterprise
and
Sustainable
Development
Target to remain
at 500
16. Increased value of
sales generated by
businesses as a
direct result of
Economic
Development
intervention      
(Locally set target)
£22.11m £13.11m £5m C06.08 Enterprise
and
Sustainable
Development
Target to remain
at £5m 
33

Page 34

12 
Resource Outcome: South Lanarkshire is an attractive place to start, grow and locate a business 
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
17. Percentage of
procurement spend
on local enterprises      
(Locally set target)
18.21% LGBF Data
for 2022-23
due January
2024
More than
2022-23
figure
06.11 Enterprise
and
Sustainable
Development
Target:
improvement on
the previous
year 
Resource Outcome: Economic development and growth in South Lanarkshire is fair, inclusive,
sustainable and low carbon
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
18. Delivery of UK
Shared Prosperity
Program      
(National target)
N/A N/A £3.m 07.02 Enterprise
and
Sustainable
Development
New measure
for 2023-24 
Resource Outcome: Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth  
Measure 2021-22 2022-23 2023-24 
Target
Links Service Notes
19. Percentage of all
planning
applications
approved      
(Locally set target)
97.1% 97.6% 95% 05.05 Planning and
Regulatory
Services
The rolling
target of 95%
provides the
service with
scope to refuse
applications 
34

Page 35

13 
4.b. What actions we will take in 2023-24 
Resource Outcome: High-quality streets, parks and other public areas ensures South Lanarkshire is
a place where people want to live, work, visit and invest
Action  Milestones/steps we will take to deliver
our actions Links Service
1. Prepare an Open Space
Strategy in partnership with
Glasgow and Clyde Valley
Green Network Partnership
and other council services.
Strategy will contain
standards on access to and
quality of open spaces.
Draft Open Space strategy to be
presented to the Planning Committee by
March 2024
C01.09 Planning and
Regulatory
Services
2. To make South Lanarkshire
a cleaner place to live, work
and visit free of letter, fly-
tipping and dog waste
Prepare an annual progress report for
Climate Change and Sustainability
Committee in September 2023,
demonstrating the impact of the Litter
Strategy (2022-2027)
01.09 Facilities,
Waste and
Grounds 
Resource Outcome: Communities are encouraged and supported to reduce, re-use and recycle their
waste
Action  Milestones/steps we will take to deliver
our actions Links Service
3. Support a circular economy
by re-using, recycling and
generating energy from the
waste we manage
Commence a review of the waste service
during 2023-24 that will incorporate the
impact of the Deposit Return Scheme 
01.06 Facilities,
Waste and
Grounds 
Resource Outcome: The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate change, and acting sustainably
Action  Milestones/steps we will take to deliver
our actions Links Service
4. Lead by example and
influence area-wide
climate change and
sustainability action 
Implement the Sustainable Development
and Climate Change Strategy (2022-2027)
Action Plan, and report progress at quarter
two and quarter four to Climate Change
and Sustainability Committee
C01.08 Enterprise and
Sustainable
Development
5. Protect, enhance and
respect South
Lanarkshire’s natural
environment
Develop a new Biodiversity Strategy (2024
– 2030) and Biodiversity Implementation
Plan for (2024-2026) for approval by
Climate Change and Sustainability
Committee by February 2024.
C01.02 Facilities,
Waste and
Grounds
6. Ensure national planning
policy set out in National
Planning Framework 4 in
relation to climate change,
biodiversity and
sustainable travel is
embedded in decision
making process for
planning applications and
the preparation of the
South Lanarkshire Local
Development Plan 3. 
Prepare Supporting Planning Guidance on
climate change & sustainability and green
issues as an interim measure pending
preparation of LDP3.
01.08 Planning and
Regulatory
Services 
Awareness sessions to be developed for
elected members, planning officers and
developers/agents by September 2023 
35

Page 36

14 
Resource Outcome: The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate change, and acting sustainably
Action  Milestones/steps we will take to deliver
our actions Links Service
7.  Create the conditions for
the decarbonisation of the
council’s fleet 
Implement and review the Fleet Strategy
(2020-2025) Action Plan including a
reduction in transport related emissions,
conversion of fossil fuelled small fleet to full
electric and the trialling of new fuel option
for the medium to heavy fleet.
01.13 Roads,
Transportation
and Fleet 
8.  Deliver new and improved
low carbon vehicle
charging infrastructure
Maintain, manage and expand public
infrastructure points / hubs in line with
available internal and external funding
sources.
01.13 Roads,
Transportation
and Fleet 
Resource Outcome: The council supports and promotes a fairer, healthier, and more sustainable
food system
Action  Milestones/steps we will take to deliver
our actions Links Service
9. Develop a sustainable food
system to overcome social,
health, economic and
environmental issues
related to food
Implement the Good Food Strategy (2020-
2025) Action Plan and report progress at
quarter two and quarter four to the Climate
Change and Sustainability Committee
01.11 Enterprise and
Sustainable
Development
10. Continue to identify
opportunities to increase
food growing provision
throughout South
Lanarkshire 
Progress planning application and process
for new site at Chatelherault, and if
successful, begin development of the site
and allocating plots from the waiting list by
March 2024
01.03 Facilities,
Waste and
Grounds 
Resource Outcome: All roads, footways, cycle routes, bridges and associated infrastructure are safe
and fit for purpose
Action  Milestones/steps we will take to deliver
our actions Links Service
11. Deliver prioritised road
safety infrastructure
improvements and
promote road safety 
Deliver road safety projects and schemes in
line with agreed 2023-24 programme 
01.01 Roads,
Transportation
and Fleet 
12. Improve resilience of
strategic routes during
adverse weather 
Implement prioritised / enhanced drainage /
gulley cleaning action plan across the
network by June 2023
01.08 Roads,
Transportation
and Fleet 
36

Page 37

15 
Resource Outcome: Road and transportation infrastructure supports new development, enables use
of public transport and encourages active travel
Action  Milestones/steps we will take to deliver
our actions Links Service
13. Produce a new Local
Transport Strategy for
South Lanarkshire to
support the National and
Regional Transport
Strategy as well as the
provisions, where
appropriate, of the
Transport Scotland Act 
Draft Local Transport Strategy to be
presented to Committee by Spring 2024
C01.10 Roads,
Transportation
and Fleet 
14. Provide road and
transportation
infrastructure
improvements to support
new developments
including those
undertaken as part of the
City Deal
An Outline Business Case will be prepared
for the Stewartfield Way Sustainable
Transport Capacity Enhancement Project in
Autumn 2023
C01.10 Roads,
Transportation
and Fleet 
15. Encourage active travel by
extending our network of
walking and cycling routes 
Deliver walking and cycling projects/
schemes in line with agreed 2023-24 capital
programme and to support safe routes
priorities.
01.10 Roads,
Transportation
and Fleet 
Resource Outcome: All school and nursery children have access to nutritious school meals 
Action  Milestones/steps we will take to deliver
our actions Links Service
16. Complete the roll out of free
school meals to all primary
children
All P6s and P7s to receive free school
meals in line with Scottish Government
timescales 
03.03 Facilities,
Waste and
Grounds 
Resource Outcome: Health inequalities are addressed through collaboration with local communities
and partners
Action  Milestones/steps we will take to deliver
our actions Links Service
17. Complete the Shaping
Places for Wellbeing project
in Rutherglen 
Use the data analysis conducted during
2022-23 to develop actions to address
health inequalities, taking account of the
existing infrastructure available in the form
of codesigned solutions, by October 2023
03.03 Planning and
Regulatory
Services
Present regular update reports to the
Corporate Management Team, with a final
outcome report being delivered by March
2024 
37

Page 38

16 
Resource Outcome: All residents have the opportunity to access cultural, leisure and outdoor
recreational activities to help improve their wellbeing and quality of life
Action  Milestones/steps we will take to deliver
our actions Links Service
18. Develop a Commissioning
Plan to define the council’s
ask of South Lanarkshire
Leisure and Culture (SLLC) 
Develop a Commissioning Plan for
approval by Executive Committee 
03.03 Enterprise and
Sustainable
Development
19. Improve health and
wellbeing by offering
attractive and affordable
leisure and cultural
activities delivered with
warmth, friendliness and
individual pride 
(SLLC Mission)
Implement the South Lanarkshire Leisure
and Culture Strategy (2022-2027), monitor
impact on a quarterly basis via the four
SLLC Strategy Implementation Groups,
and report on progress twice per year to
the Community and Enterprise Resources
Committee 
03.03 SLLC
20. Begin implementation of the
multi-year Play Area
Investment Programme
Undertake consultation with local
members and communities in Larkhall,
Cambuslang and Rutherglen 
03.03 Facilities,
Waste and
Grounds
Finalise design options and implement
agreed proposals by March 2024   
Resource Outcome: Vacant, derelict and contaminated land is brought back into productive use 
Action  Milestones/steps we will take to deliver
our actions Links Service
21. Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the
Vacant and Derelict Land Fund framework
agreed for 2023-24
05.04 Enterprise and
Sustainable
Development 
Resource Outcome: South Lanarkshire is an attractive place to start, grow and locate a business 
Action  Milestones/steps we will take to deliver
our actions Links Service
22. Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate, whilst
creating the right conditions
for low carbon economic
growth
Deliver programmes, services, and events
to businesses around sectors, location,
and themes (e.g., food and drink, tourism,
construction, low carbon, innovation,
internationalisation, collaboration, and
young enterprise)
06.03 Enterprise and
Sustainable
Development
Manage the Supplier Development
Programme to deliver events, training and
e-commerce support to SME’s or third
sector organisations who are interested in
working with the public sector
06.09 Enterprise and
Sustainable
Development 
38

Page 39

17 
Resource Outcome: Economic development and growth in South Lanarkshire is fair, inclusive,
sustainable and low carbon
Action  Milestones/steps we will take to deliver
our actions Links Service
23. Review the remit,
membership and
effectiveness of the existing
Lanarkshire Economic
Forum, and if required,
refocus/restructure in order
for it to act as the Economic
Transformation Board to
drive forward the South
Lanarkshire Economic
Strategy 
Review the original scope and
membership of the Lanarkshire Economic
Forum, together with the outputs of the
Forum since establishment in 2020 
06.05 Enterprise and
Sustainable
Development
Dependent on the outcomes of the review,
refocus/restructure the forum in
consultation with the partner organisations 
24. Promote sustainable
economic development
across South Lanarkshire 
Prepare an annual progress report for
Community and Enterprise Resources
Committee, demonstrating the impact of
the South Lanarkshire Economic Strategy
(2022-2027)
06.05 Enterprise and
Sustainable
Development
25. Positively enhance the
benefits of tourism across
South Lanarkshire by
delivering the very best for
our visitors, our
businesses, our people, our
communities, and our
environment
Prepare an annual progress report for
Community and Enterprise Resources
Committee, demonstrating the impact of
South Lanarkshire Tourism Strategy
(2022-2025)
06.06 Enterprise and
Sustainable
Development
26. Champion the social
enterprise sector and invest
in start-up and growth of
our local social enterprise
Develop a new Social Enterprise Strategy
for approval by Community and Enterprise
Resources Committee in May 2023.
06.03 Enterprise and
Sustainable
Development
27. Income generating projects
will be scoped across all
council resources to identify
viable projects with a focus
on green initiatives
including exploring options
for delivery and funding
Liaise with all council resources, third
parties and funders to identify new
opportunities for generating income and
consider a risk analysis of each
opportunity  
06.05 Enterprise and
Sustainable
Development
28. Consult with community 
organisations and develop
a Rural Action Plan max-
imising existing and future
funding through Community
Led Local Development
and Renewable Energy
Fund 
Finalise the Rural Action Plan and report
to Rural Task Force in November 2023 
C05.13 Enterprise and
Sustainable
Development 
39

Page 40

18 
Resource Outcome: Thriving town and neighbourhood centres provide a focal point for local
communities 
Action  Milestones/steps we will take to deliver
our actions Links Service
29. Complete the south
Lanarkshire wide town
centre visioning strategy
which will give a strategic
overview on the
engagement and
interventions with town
centres over the next 10
years, and a series of town
specific strategies and
action plans will sit below
this, giving a template for
placemaking within our
communities.
Complete draft town centre visioning study
by end June 2023 for consultation, and
present final visioning strategy to
Community and Enterprise Resources
Committee in November 2023
C06.04 Enterprise and
Sustainable
Development 
Resource Outcome: Physical development and land use in the area is enabled, guided and controlled
to help facilitate economic growth  
Action  Milestones/steps we will take to deliver
our actions Links Service
30. Preparation of revised   
Residential Design Guide
Develop interim framework for
consultation with stakeholders, with final
framework prepared by end of June 2023
05.05 Planning and
Regulatory
Services
Present finalised document to Planning
Committee for approval by December
2023 
Resource Outcome: Customers experience high quality and improving council services 
Action  Milestones/steps we will take to deliver
our actions Links Service
31. Implement the Frontline
First Fund
Identify and implement a programme of
projects to deliver the Frontline First Fund
07.01 Facilities,
Waste and
Grounds 
40

Page 41

19 
Section Five – Resourcing the Plan 
5.0. Introduction 
In this section we consider the resources needed to implement our plan, including funding
and staffing. 
5.1. Revenue Budget 2023-24
The resource has a Net Revenue Budget of £148.531 million for 2023-24. The table
below allocates this budget across the services: 
NET Budget by Service 2023-24
Detail £ million %
Facilities, Waste, and Grounds 79.511 54%
Roads, Transportation and Fleet 26.535 18%
Planning and Regulatory Services   5.001 3%
Enterprise and Sustainable Development  7.262 5%
South Lanarkshire Leisure and Culture Ltd 30.155 20%
Total 148.464 100%  
5.2.     Capital Budget 2023-24 
The following capital budget of £58.918 million is allocated to the resource for 2023-24: 
Capital Programme 2023-24                                 
Service £ million
Facilities, Waste, and Grounds 2.286
Roads, Transportation and Fleet 20.118
Planning and Regulatory Services   -
Enterprise and Sustainable Development  36.514
Total 58.918 
41

Page 42

20 
5.3. Resource Employees
Community and Enterprise Resources has 3,413 employees, as at 1 February 2023. We
support these employees to deliver their duties through a range of policies, including
personal appraisal and a robust training framework. 
The number of employees by service is as follows: 
Service Number of
employees
Facilities, Waste, and Grounds 2,647
Roads, Transportation and Fleet 593
Planning and Regulatory Services  91
Enterprise and Sustainable Development 82
Total 3,413 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk 
42

Page 43

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023 
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Town Centre and Place Based Investment Programme -
Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on town centre activity
 update members on the allocation of year 3 of the Place Based Investment
Programme (PBIP) 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the updates provided in sections 3 and 4 of the report be noted;
(2) that the proposal set out in sections 4.4.3 and 4.4.4 of the report be approved;
and
(3) that the Executive Director (Community and Enterprise Resources) be
authorised to proceed with the allocation of funding for year 3 of the PBIP as
set out in sections 4.4.3 and 4.4.4 of the report. 
3. Background 
3.1. The nature of town centres across the UK is in a transitional stage.  The range of
issues involved in the challenges town centres are facing are broad and complex.
Factors such as the economic downturn, internet shopping, the growth of out of town
shopping malls, changes in retailers’ business models and consumer expectations
have resulted in a decline in footfall. 
3.2. Some of the issues are local and specific to individual towns, however, many are
issues seen across the country influenced by wider economic patterns, consumer
behaviour and corporate decisions.  Supporting town centres remains a Council
priority and officers continue to work in partnership with groups and organisations in
each town to achieve our common goals. 
3.3. The contribution town centres make to our communities cannot be overstated. Town
centres support and contribute to people’s lives across our communities whether this
is to access essential services, visiting for shopping or enjoying leisure time. Around
70% of businesses and jobs in the economy are located in town centres and they are
often the principal location for leisure and hospitality.  They retain a vital social
importance as a meeting, events and performance space.    
5
43

Page 44

Strategic Overview
3.4. Across the 10 towns defined in the South Lanarkshire Local Development Plan (LDP)
there is active and ongoing engagement with the most appropriate groups in each
town.  These range from town to town and include Business Improvement Districts
(BIDs), Development Trusts, Community Councils and private property owners.   
3.5. Town Centre strategies and action plans have been prepared and approved for
Hamilton, Cambuslang, Larkhall and Blantyre with work now underway in Rutherglen. 
Similar plans are being progressed by the communities in Lanark and Carluke along
with the master planning work by the owners of East Kilbride. A review and refresh of
the Hamilton Strategy is the subject of a separate paper at this meeting. 
3.6. These strategies and action plans are closely aligned with the Government approach
to town centres captured in the New Future for Scotland’s Town Centres report and
action plan. 
3.7. Officers in Economic Development are working with all key stakeholders across our
towns and have commissioned two key pieces of work to set the direction of the
Council’s work around town centres going forward.  These will inform and align with
existing and emerging funding opportunities around town centres. 
 Town Centre Visioning – this will set out how the Council delivers on the strategic
aims and objectives at a local level.  As noted above, while all towns have similar
challenges, the solutions are not always the same.  This work will set out how the
Council, communities and partners should deliver meaningful and sustainable
change within our town centres through a series of projects and action plans. 
 Transition to Net Zero – town centres are major contributors to pollution and
although a number of early wins have been achieved, the ways to deliver long
term meaningful and sustainable reductions are complex and not always
palatable to business or customers.  This work will set out a practical approach
to working towards net zero across our towns. 
3.8. Officers in Enterprise, Planning, and Community Engagement are working with
colleagues in The Improvement Service on a pilot project in Rutherglen called Shaping
Places for Wellbeing.  The project is working in seven towns across Scotland taking a
multi-agency approach to placemaking. The initiative is still in the early stages,
however, it is hoped it will become a useful model for working with communities across
south Lanarkshire. 
4. Current initiatives
4.1. There are a number of key areas of work underway in support of our town centres
which will inform the investment strategies and priorities going forward for the next 5
to 10 years. This work will also support and inform potential Levelling Up Fund and
other external funding bids. 
4.2. East Kilbride Town Centre Masterplan
4.2.1. As members are aware the shopping centre has gone through a challenging period
over the last 18 to 24 months.  Along with the challenges faced around COVID-19 and
the changes in shopping patterns, the centre has been called in by the bank, who
funded the previous purchase and was subsequently put into administration on 16
November 2022. The shopping centre has vacancy rates of around 30% albeit there
are some particularly challenged sections where vacancy rates are especially high
44

Page 45

and where the key challenges lie. The town centre is very large for its catchment and
in comparison, to its nearest competitors. East Kilbride has around 230 retail units
while each of Braehead, Glasgow fort and Silverburn have between 120 to 130 units
each. 
4.2.2. With each change of ownership, a new team of asset managers has taken
responsibility for the centre and, given the scale and complexity of the asset, it has
taken some time for them to familiarise themselves with the asset, issues and
appropriate strategy.   
4.2.3. Throughout these challenging times, officers have kept regular contact with both the
Asset Management Team and the Local Management Team.  At all times these
discussions have been positive and the commitment by the asset managers to the
future of the town centre is without doubt. 
4.2.4. Work on the masterplan has progressed at pace since the administration was
confirmed with a draft position agreed at the end of April 2023. It is clear from this
work, the size of the centre and the level of vacancy rates that the centre cannot
sustain the amount of retail which needs to be significantly reduced with alternative
uses considered in the most appropriate sections of the centre. The draft reflects this
position and will be widely consulted on over the next few months with a programme
of consultation being prepared. The masterplan will be updated to reflect the
consultation process thereafter be submitted for planning permission in principle. The
administrators have been clear they are keen to work through this process efficiently
and seek to implement the initial phases of works in 2024/2025 
4.3. Hamilton Town Centre Masterplan
4.3.1. Following the ongoing challenges faced by the Regent Centre and the closure of the
Marks and Spencer’s unit the town centre requires the preparation of a masterplan for
the south eastern quarter of the town centre. Vacancy rates in the town have remained
consistently below the national average, however, there are a number of key units
which have become vacant and which do not seem likely to find occupiers in the short
term.  The owners of the Regent Centre have confirmed their intention to sell their
interest and, as with East Kilbride, the masterplan will set the context for public and
private sector investment over the next 5 to 10 years and will be beneficial in effecting
a change of ownership. 
Consultants will be procured during May/June with the intention of a draft masterplan
for consultation being completed by the end of the calendar year. As with East Kilbride
it is intended the masterplan will become a supporting document for the Local
Development Plan and inform public and private sector investment going forward. 
4.4. Place Based investment Programme
4.4.1. The Scottish Government announced in their Programme for Government in February
2021 that they proposed to implement a place-based investment programme over the
5-year period of the parliament. The funding is targeted at addressing some of the
challenges faced by Scotland’s places across the country. 
4.4.2. The Council was awarded £2.003 million for year one of the programme, £1.74 million
for year 2 and £1.213 million for each of the remaining 3 years giving total funding of
£7,382 million over the 5-year programme. The programme has just entered year 3
with the projects for years one and 2 complete or on target to complete in line with the
terms around financial spend of the grant award. Two projects were carried over into
year 3 due to delays in the programmes. These are Larkhall Leisure Centre and Lanark
45

Page 46

outdoor space. The budget for year three also includes project budget carried forward
from year two of £331,000 and Shared Prosperity Funds of £390,000, giving an overall
budget allocation for year three of £1.934 million. There is also an allocation of
£223,000 from Shared Prosperity Funds for year 4 giving a total of £1.436 million in
that year. 
4.4.3. The proposed allocation for year 3 reflects these funding commitments.  It is also
recommended that projects with longer delivery programmes are funded over more
than one year and on that basis recommendations for the partial allocation of year 4
are included.  The proposed allocation is as follows:- 
Town Project Description Allocation (£)   
Year 3 Year 4  
Budget 1,934,000 1,436,000
Larkhall Larkhall Leisure
Centre
Funding in
support of wider
redevelopment
880,000 500,000
Lanark Outdoor Space Improve public
space to provide
multipurpose
capacity
289,000 
Larkhall Coalyard
Housing
Support
development of
social housing
scheme to
deliver 18 units
190,000 260,000
East Kilbride Civic Centre/
Town Centre
Masterplan
Continuation of
work to set the
future direction
of the town
centre
150,000 
Hamilton Town Centre
Masterplan 
Study to set the
future direction
of the town
centre
75,000 
East Kilbride Kirktonholme
pitches
Phase 2 of
improvement of
pitches and
changing
facilities
150,000 150,000
Lesmahagow Lesmahagow
Development
Trust
Creation of
community and
business facility
and 2 affordable
flats in town
centre
50,000 50,000
Biggar Biggar Youth
Project
Youth club
building
redevelopment
to improve
green profile in
town centre
150,000 150,000  
Total 1,934,000 1,023,000
46

Page 47

4.4.4. As with previous years the above allocations are estimates based on the detailed work
carried out by the applicants and Council officers. Previous years have seen variations
to the project costs and timescales and in line with previous approvals it is
recommended that the Executive Director (Community and Enterprise Resources) is
given authority to vary the funding between projects, within the overall constraints of
the programme. 
4.4.5. Should the Committee be minded to approve the recommendation, groups will be
formally notified of their grant award in line with previous years with the same
monitoring and governance arrangements put in place by officers in Enterprise and
Sustainable Development. 
4.5. Town Centre Living
4.5.1. One of the keys to supporting and regenerating our town centres is increasing the
amount of town centre living. In many of our towns this is at a very low level relative to
other towns and historic rates, and there is potential for some of the less commercially
viable parts of town centres to be considered for residential development. An internal
officer working group has been established and their recommendations will be
presented to the appropriate Committee in due course. 
5. Employee Implications
5.1. The continued development and implementation of this and future years of the PBIP
will be taken forward by officers within Enterprise and Sustainable Development
Services, in consultation with colleagues across all other Council resources and
Community Planning Partners as appropriate. 
6. Financial Implications
6.1. The PBIP funds from the Scottish Government, where appropriate, will be brought into
the Council’s General Services Capital Programme and will be subject to the normal
monitoring and financial processes. This will feed into the requirements of the Scottish
Government to report on progress and identify spend. 
6.2. In respect of the size of the applications, many of the groups involved will not have the
cash flow to finance their planned project and may request advance funding to allow
their project to progress. In line with previous funds, forward funding of projects is not
available. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The projects and initiatives identified in this report will be delivered using a range of
sustainable techniques and models, having regard to best practice and current
construction industry guidance. It is also noted that many of the projects will result in
the redevelopment of vacant buildings and land. 
8. Other Implication
8.1. Due to the diverse portfolio of projects, the timescales within which projects have been
developed and the capacity of groups involved assessed, however, there is a risk that
some projects may not proceed in the way envisaged and fail to meet the timescales
required. 
8.2. Ultimately, this could result in grant not being expended in the relevant time frame and
opportunities to implement these specific projects will not be maximised. This may
result in project funding being withdrawn. To mitigate this risk, where possible, a
reserve list of projects has been compiled and will be used if needed.
47

Page 48

9. Equality impact assessment and consultation arrangements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Impact
Assessment is required. 
9.2. Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in delivering
services and initiatives in our Town Centres. This consultation and co-operation will
continue throughout the duration of the initiative. 
David Booth
Executive Director (Community and Enterprise Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres 
Previous References
 Community and Enterprise Resources Committee, 29 June 2021 – Place Based
Investment Programme
 Community and Enterprise Resources Committee, 7 December 2021 Place Based
Investment Programme (PBIP) and Town Centre Capital Fund – Update
 Community and Enterprise Resources Committee, 9 August 2022 - Town Centre and
Place Based Investment Programme Update and Funding Award 2022/2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- Iain Ross
Project Manager, Enterprise and Sustainable Development
E-mail:-  Iain.ross@southlanarkshire.gov.uk 
48

Page 49

b Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Appointment of Public Analysts, Agricultural Analysts
and Food Examiners 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval for the appointment of a Public Analyst, Agricultural Analyst and
Food Examiners to undertake the relevant statutory duties for the Council
[purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following:-
[recs]
(1) that the appointment of Karen Maddison of Aberdeen Scientific Services to act
on behalf of South Lanarkshire Council as Public Analyst and Agricultural
Analyst be approved; and
(2) that the appointment of Sarah Green and Claire Brechin of Edinburgh City
Council to act on behalf of South Lanarkshire Council as Food Examiners be
approved.
[1recs]
3. Background
3.1. Amongst the duties and roles of South Lanarkshire’s Environmental Service there is a
need for Officers to sample a range of produce and goods such as food, water and
toys and have these items tested to ensure that they are safe and comply with statutory
standards. 
3.2. Chemical analysis can involve checking for the presence of lead in drinking water
which needs to be certified by a Public Analyst. At the same time microbiological
examination, of foodstuffs for the presence of Salmonella needs to be certified by a
Food Examiner, while samples may be taken for a range of purposes, including the
investigation of suspected food poisoning outbreaks which may have been brought to
the attention of the Council from consumer complaints, routine surveillance or as part
of local or national surveys. 
3.3. Within this context and as required by the Local Government (Scotland) Acts, Councils
are required to appoint one or more Public Analysts to carry out duties under the Food
Safety Act 1990 within their area. 
3.4. Public Analysts must possess a Mastership in Chemical Analysis (MChemA) awarded
by the Royal Society of Chemistry, and as stated in Regulation 4 of the Food Safety
6
49

Page 50

(Sampling and Qualifications) (Scotland) Regulations 2013, the individual appointed
must hold the appropriate qualifications. 
3.5. Paragraph 85 of Schedule 13 to the Local Government etc (Scotland) Act 1994 also
makes it the duty of Councils to enforce Part IV of the Agriculture Act 1994 also makes
it the duty of councils to enforce part IV of the Agriculture Act within their area. Section
67(3) of the Agriculture Act requires enforcement authorities to appoint sampling
officers and analysts, and Section 67(3)(b) states that authorities shall appoint an
Agricultural Analyst. 
3.6. There is no statutory requirement to appoint Food Examiners, but it is considered to
be prudent to do so, should the local authority be called upon in legal proceedings to
confirm that a Food Examiner was entitled to act on the Council’s behalf. The
qualifications for these posts are detailed in Regulation 5 of the Food Safety (Sampling
and Qualifications) (Scotland) Regulations 2013 and the individuals referred to in the
recommendations of this report hold the appropriate qualifications. 
4. Current Position and Proposal.
4.1. Following a competitive tender exercise, the City of Edinburgh Council have been
contracted to undertake analytical services on behalf of the Council since 2007. 
4.2. On 21 August 2007, the Community Resources Committee appointed Andrew C
Mackie and Robert C Beattie as Public Analysts, Agricultural Analysts and Food
Examiners and on 22 May 2018 the Community Resources Committee appointed
Robert C Beattie and Christopher Hunt as Public Analysts, Agricultural Analysts and
Food Examiners. 
4.3. In June 2021, the City of Edinburgh Council were awarded a new 4-year contract from
June 2021 until June 2025 with an option to extend for one year to June 2026 to
provide scientific services. 
4.4. Previous Public Analyst, Agricultural Analyst and Food Examiner Robert C Beattie
retired from the City of Edinburgh Council in 2022; and Christopher Hunt will be retiring
imminently.  As such there is a need to formally appoint new personnel to fulfil the
roles of appointed Public Analysts, Agricultural Analysts and Food Examiners for
South Lanarkshire Council. 
4.5. Edinburgh Scientific Services have entered into a working agreement with Aberdeen 
Scientific Services and Karen Maddison for her to provide Public Analyst provision 
at their Edinburgh site.   
4.6. The City of Edinburgh Council have appointed both Sarah Green and Claire Brechin 
as Food Examiners. 
4.7. Therefore, given the above it is proposed that the following individual is appointed as
Public Analyst and Agricultural Analyst with immediate effect:- 
 Karen Maddison BSc (Hons), MChemA., CChem, MRSC 
4.8. It is also proposed that the following individuals are appointed as Food Examiners with
immediate effect:- 
 Sarah Green BSc (Hons) MRSB MIFST
50

Page 51

 Claire Brechin MIFST MRSC RSci 
5. Employee Implications
5.1. There are no employee implications as a result of the contents of this report. 
6. Financial Implications
6.1. The appointment of Public Analysts, Agricultural Analysts and Food Examiners sits
within the context of an existing contract the Council have entered into with the City of
Edinburgh Council to provide scientific services.  The contract was entered into in June
2021 and is due to end in June 2025, with the option at that time to extend the contract
for a further year to June 2026.  There are, therefore, no additional financial
implications associated within this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no significant implications in terms of climate change, sustainability and
environmental implications as a result of the contents of this report. 
8. Other Implications 
8.1. There are no other significant implications as a result of the contents of this report. 
9. Equality Impact Assessment and Consultation Arrangements 
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
15 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable 
Previous References
 Community Resources Committee Report 21 August 2007
 Community and Enterprise Resources Committee Report 22 May 2018 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Karen Wardrope Divisional Environmental Health Officer
Tel: 07585 404775 
E-mail:- Karen.wardrope@southlanarkshire.gov.uk
51

Page 52

52

Page 53

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: On-Request Garden Waste Collection   
1. Purpose of this Report
1.1. The purpose of the report is to:- 
 seek approval to not reinstate the on-request garden waste collection service
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
recs]
(1) that the operational and financial position, outlined in section 4.1 of the report,
be noted; and
(2) that it be agreed not to reinstate the on-request garden waste collection service. 
3. Background
3.1. A review of the Waste Management Service is underway that is considering the
Service’s current and future operating model. The COVID-19 pandemic has had a
significant impact across all areas of the Service, from day to day operations the ability
to deliver all pre-pandemic services; to the new working from home societal change
seeing an increase in the waste tonnages within the household collection service. The
Service operates in a complex legislative environment and is subject to often volatile
market conditions in the disposal of waste and these key factors will be incorporated
into the review process. 
3.2. The early work of the review process has aligned with the scope of the Charging
Transformation Review to develop proposals for the Waste Service. The Charging
Transformational Review was initiated in summer 2021 to review the level of charging
across the Council with a focus on services that were unable to recover costs. A
number of proposals were brought forward as part of the budget process for
2023/2024. 
3.3 The next stage of the review will consider internal developments as well as the
complex national context in the waste sector such as the introduction of the Deposit
Return Scheme which has now been pushed back to March 2024. This will be a multi-
year programme of work that will consider:- 
 the optimum collection model to maximise recycling rates
 alternative working patterns
 waste infrastructure – stores, Civic Amenity sites, waste transfer stations
 meeting Net Zero targets
 technology developments 
7
53

Page 54

3.4. Further reports will be presented to Community and Enterprise Resources Committee
as the review process progresses. 
4. On-request garden waste service
4.1. The on-request garden waste uplift service has been suspended since the onset of
the COVID-19 pandemic in March 2019 to allow the Council to focus resources on the
household refuse collection service. Since the suspension of the service, new
contractual arrangements for the disposal of this waste stream have been
implemented. If the service was re-started, vehicles would be required to travel further
to the processor with an increase in labour and transport costs. The new contract has
also seen an increase in disposal costs per tonne which would equate to an additional
cost of £0.130 million per annum based on pre COVID-19 tonnages. 
4.2. Given the operational and financial position outlined in 4.1, it is proposed that the on-
request garden uplift is not reinstated. This would avoid the additional costs set out in
section 5.2 and generate a further saving to the Council of around £0.100 million based
on pre COVID-19 operations and tonnages. 
4.3. Residents can continue to use the Council’s 6 Household Waste Recycling Centres to
dispose of their garden waste. In addition, the service has a small number of hot
composters available that could be provided free of charge to residents that do not
currently receive a food/garden waste collection service, and this will allow
householders to compost waste at home. 
5. Employee Implications
5.1. There are no employee implications as a result of the contents of the report.  
6. Financial Implications
6.1. As outlined in section 4, reinstatement of the on-request garden waste collection
service would see additional operational costs as well as additional disposal costs of
£0.130 million per annum. There is no identified budget for these costs. Not reinstating
the service would realise a saving of £0.100 million for the Council. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no significant implications in terms of climate change, sustainability and
environmental implications associated with this report. 
8. Other Implications
8.1. There are no other significant implications as result of the contents of this report.   
9. Equality Impact Assessment and Consultation Arrangements
9.1.  A screening determination was completed in relation to the Strategic Environmental
Assessment (SEA) which confirmed there is no need for a separate SEA for these
proposals. 
9.2. An equality impact assessment (EQIA) has been undertaken during the development
of the proposals to identify and mitigate any negative impacts and seek opportunities
to promote equality. 
9.3. The assessment is that the proposals do not have any adverse impact on any of the
protected characteristics groups. 
9.4. No formal consultation is proposed in relation to this proposal. 
54

Page 55

Davie Booth
Executive Director (Community and Enterprise Resources) 
15 May 2023 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kevin Carr
Head of Facilities, Waste and Grounds 
Tel:  01698 454708 
E-mail:- kevin.carr@southlanarkshire.gov.uk
55

Page 56

56

Page 57

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 consider a grant application to the Renewable Energy Fund (REF) from East
Kilbride United
 consider a grant application to the REF from East Renfrewshire Council
[purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendations:-
[recs]
(1) that a grant be awarded to East Kilbride United of up to £100,000 from the
Renewable Energy Fund to facilitate East Kilbride United in the construction of
a new artificial pitch; and
(2) that a grant be awarded to East Renfrewshire Council of up to £72,988 from
Renewable Energy Fund towards the management and maintenance of the
network of routes at Whitelee Windfarm which extends into South Lanarkshire
for a 2-year period up to March 2025.
[1recs]
3. Background
3.1. Since 2004, the Council has collected and administered community benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing contributions from windfarm developers, advising potential
applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities. 
3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority. All grants awarded are reported annually to the Community and
Enterprise Resources Committee.   
4. Grant Recommendation
4.1. Application Number 837 
East Kilbride United (EKU) is an established charity with its purpose being:-  
8
57

Page 58

 to promote and encourage the sport of football without any distinction of sex,
colour, nationality or of political, religious or other opinions 
4.2. The organisation is a community football club with over 700 members and volunteers
ranging from 4 to over 80 years of age in there walking football section. The aims of
the club are to support health and wellbeing, and create an enjoyable, long lasting
football experience, for all members of the community. To support this vision, they
have teams of varying abilities playing across a wide range of competitive and non-
competitive levels. 
4.3. EKU has a management committee, 173 regular volunteers, 711 members all of whom
have been consulted regarding the project to ascertain, co-ordinate and reflect the
views of the community it represents. 
4.4. The grant will allow EKU to proceed with the construction of an artificial surface pitch,
which will facilitate an increase in the participation of football, particularly for children,
walking football and disability inclusive teams. Currently EKU has two grass pitches at
Kirktonholme Pavilion, East Kilbride where EKU secured an asset transfer from the
Council in 2019. At present the pitches cannot be played on constantly as they would
become unusable and are also unsuitable for the disability inclusive teams. The
construction of an artificial surface will allow the club to enhance the accessibility for
all.   
4.5. This fourth-generation surface will allow EKU coaching staff and volunteers to
enhance the activities and opportunities for years to come. The project has been
established in response to community demand, it will improve inclusion and increase
healthy activities for the surrounding area. 
4.6. The project requires capital funding to meet the cost of excavation, drainage, paving,
synthetic surface, fencing and flood lights to ensure year-round accessibility. EKU
estimate the overall cost of the project to be £856,306.   
4.7. REF awards are subject to suitable match funding being secured. The REF grant
sought is 12% of the project value with the match funding as set out below. 
Funder Stage Value
Scottish Football Association To be confirmed £350,000
Sport Scotland To be confirmed £56,306
East Kilbride United Confirmed £50,000
SLC Place Based Investment (PBI) To be confirmed £300,000
SLC Renewable Energy Fund Grant
(12%)
For approval £100,000
Total project value   £856,306  
4.8. The project is scheduled to commence in March 2024 and be completed in June 2024
which will allow for a smooth transition with minimal disruption to the playing season.  
Officers will work with the applicant to monitor progress and any impact on the
timescales. The lead in time will also allow EKU to confirm additional funding awards.   
4.9. Application Number 851 
Enterprise Resources Committee on 27 June 2007 approved a Section 75 Agreement
which placed an obligation on the Council to jointly prepare and implement an access
strategy for Whitelee Windfarm, which includes the delivery of recreational activity and
events, volunteering, biodiversity work, outreach, maintenance and the delivery of
environmental education to local schools and community groups.
58

Page 59

4.10. The implementation of these works is delivered by a ranger service, which is managed
by East Renfrewshire Council (ERC) and which South Lanarkshire Council (SLC)
provide a contribution.  Over the period 2016 to 2022, SLC has contributed £277,695
with ERC contributing £796,129 to a total project cost of £1,073,824.   
4.11. The total project cost for the period up to March 2025 is £202,746 of which a
contribution is sought from SLC. This expenditure includes staff costs (£156,760),
transport costs (£25,500), accommodation and overheads (£9,500), and events, tools
and equipment (£11,000).  These costs will be incurred over a two-year period
2023/2024 and 2024/2025.   
4.12. The project will be managed by the Whitelee Access Officer, who reports on a regular
basis.   
4.13. REF awards are subject to suitable match funding being secured. The REF grant
sought is 36% of the project value with the match funding as set out below.  
Funder Stage Value
East Renfrewshire Council Confirmed £129,758
SLC Renewable Energy Fund Grant 
(36%
For approval £72,988
Total project value   £202,746 
4.14. The project is scheduled to commence in spring 2023 and be complete by March 2025.
Officers will work with the applicant to monitor progress and any impact on the
timescales. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. The awards will come from the community benefits associated with the Whitelee
Windfarm which contributes to the Renewable Energy Fund. The Fund has sufficient
resources to meet the proposed grant award commitments detailed in this report. 
6.2. REF funding is subject to all other funding being secured. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The grant award will help EKU’s longer term sustainability and allow the group to
continue to support the East Kilbride area by providing leisure activities.   
7.2. The grant award to East Renfrewshire Council will allow for the continued work
supporting biodiversity, outreach and delivery of environmental education to local
schools and community groups. 
8. Other Implications
8.1. The risks associated with the EKU project are focused on the potential for cost
overruns, delays to the projects or match funding not being secured and the long-term
use of the asset. Work will continue with the applicant to help ensure match funding is
secured and that the project is delivered on time and within budget. 
9. Equality Impact Assessment and Consultation Arrangements
9.1 This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required.
59

Page 60

David Booth 
Executive Director (Community and Enterprise Resources) 
16 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 Completed REF Grant Application Form for application number 837
 Completed REF Appraisal Scoring Sheet for application number 837
 Completed REF Grant Application Form for application number 851
 Completed REF Appraisal Scoring Sheet for application number 851   
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Colin McFarlane
Project Development Officer
Enterprise and Sustainable Development Services
E-mail:-  colin.mcfarlane@southlanarkshire.gov.uk
60

Page 61

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023 
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Annual Report 
1. Purpose of Report
1.1.  The purpose of the report is to:- 
 provide an update on the Community Benefit Funds administered by Enterprise
and Sustainable Development Services on behalf of the Council during
2022/2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Community Benefit Funds administered by the Council and the grants
awarded under the Renewable Energy Fund, Clyde Wind Farm Fund and
Quarry Funds in 2022/2023 be noted; and
(2) that the completion of a publicity report for the Community Benefit grants
2022/2023 be approved. 
3. Background
3.1. The Council has a well-established mechanism for the collection and distribution of
community benefit related to windfarm developments. This was initially established
following the approval of a report by the Executive Committee entitled Community
Benefit (Establishment of a Renewable Energy Fund) on the 3 March 2004. 
3.2. The Council administers the community benefit element of the Renewable Energy
Fund (REF) for 42 wind farms within South Lanarkshire and the community benefit
for Clyde Wind Farm Fund (CWFF) and 5 operational quarries. Operators of larger
windfarm developments provide recurring annual fund contributions, formalised
through legal agreements, whilst smaller developments such as single wind turbines,
may consider providing a ‘capitalised’ one off community benefit payment.
Community groups, social enterprises, trusts, public organisations and not for profit
organisations within 10km of the contributing windfarm provider are eligible to apply.
Over the 8 year period, 2015/2016 to 2022/2023, the Council has made awards of
£9.8 million from the Community Benefit Funds to 588 projects. 
3.3. The agreements around the provision of community benefit oblige the Council to
administer these funds using the REF mechanism. This task is undertaken by
Enterprise and Sustainable Development Services who are responsible for all
aspects, from securing the contributions from the developers, advising potential
applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. The Service
9
61

Page 62

continually seeks ways to maximise the community benefit for all eligible
communities across South Lanarkshire. 
3.4. Between the various funds £3,111,584 has been administered in 2022/2023. Apart
from one-off capitalised payments, the funds receive income for the duration of each
windfarm’s operational life and, typically, recurring annual payments which rise in
line with the Retail Price Index. The operation of the Council’s Community Benefit
Policy, with emphasis on the renewable energy sector has proven to be a success
with communities accessing funding for a diverse range of locally based projects. 
3.5. Alongside these established windfarm developments and their associated
Community Benefit Funds, there is several other potential wind farm developments
throughout South Lanarkshire which are subject to planning approval.  It is,
therefore, possible that subject to appropriate agreements being put in place, the
level of community benefit funding available to communities will increase over the
next 10 years. If promoted and managed well, this increase will have a significant
positive impact on the eligible communities. 
3.6. Although Enterprise and Sustainable Development Services lead in the delivery of 
Community Benefit Funds, there is a significant level of consultation and cooperation 
across a wide range of Council services. This ensures that applicants receive
support and advice to ensure the projects being developed meet the needs and
aspirations of the community; are of a high quality and are delivered efficiently and
effectively. 
3.7. It should be noted that there are also windfarm funds within South Lanarkshire
which are administered outwith the scope of the Council’s Renewable Energy Fund.
These include SSE Clyde Extension, Auchrobert Community Benefit Fund, Ventient,
Galawhistle Community Benefit Fund, Ventient Glenkernie Community Benefit Fund
and Kypemuir and Banks Kypemuir Community Benefit Fund.   
3.8. Community and Enterprise Resources has commenced an exercise to review
renewable energy contributions to determine their efficiencies and to explore the
opportunity for changes to current and projected arrangements to the benefit of our
communities.  Reports will be provided to the Rural Task Force and Community and
Enterprise Resources Committee on this exercise as it progresses. 
4. Renewable Energy Fund Projects Approved During 2022/2023
4.1. There are currently 42 windfarm developments contributing to the REF operating
across South Lanarkshire at the following locations:- Andershaw, Auchrobert, Bank
End Rig, Blacklaw, Blantyre Muir, Burnbrae, Calder Water, Climpy, Couplaw,
Dungavel, Dykehead, Eastertown, Gallawhistle, Garelwood, Greenwall, Greenhall
View, Haspielaw, High Blackwood Yard, High Dyke, JJ’s Farm, Lampits, Letham,
Millburn, Muirhall, Muirhall Extension, Middlemuir, Netherfauldhouse, Nether
Kypeside, North Brackenridge, Nutberry, Pates Hill, Rench Farm, Tanhill, Upper
Haywood, West Browncastle, Westtown, Whitehill, Whitelee, Woodlands, Yards
Farm, Kypemuir, Douglas West. 
4.2. During 2022/2023, contributions of £2,020,682 (including interest) were received
from the operating companies, incorporating both annual payments and “one off”
payments. 
4.3. A diverse range of projects across South Lanarkshire have been supported. A
complete list of projects supported in the last financial year is attached at Appendix
1. A total of 48 projects have been supported with total grants of £596,587 towards
62

Page 63

total project costs of £1,182,084 giving an average grant award of £12,429 towards
an average project cost of £24,627 at a 50% intervention rate. 
4.4. At the Executive Committee on 21 November 2018 a series of amendments to the
REF were approved. One of these was the introduction of a micro grant fund in
2019/2020 of up to £5,000 per annum available to community councils or equivalent
community organisations to award small grants of up to £500 locally. This was
established for an initial 2-year period and at the Community and Enterprise
Committee of 16 February 2021 it was agreed to continue the micro grants after
2020/2021. In 2022/2023, 25 community councils or similar organisations such as
resident associations and community trusts were awarded micro grants totalling
£103,264. Details of these grant awards are set out in Appendix 2.   
4.5. Taking REF grants and the micro grants awards together a total of 73 grants were
awarded during 2022/2023 with a total value of £699,851.  This is a decrease on the
77 grants and a total grant value of £1,163,847 reported in 2021/2022. There is
strong pipeline of projects in development for 2023/2024.   
5. Clyde Wind Farm Fund (CWFF) Projects - 2022/2023
5.1. During 2022/2023, the CWFF received total contributions of £1,090,902 from SSE. 
5.2. The Fund supported 11 new projects with a combined grant award of £248,005. The
overall value of these projects was £394,798 giving an average grant award of
£22,545 towards an average project cost of £35,890 - a 63% intervention rate. A
complete list of projects supported in the last year is attached at Appendix 3. 
5.3. In 2017, a micro grant fund was introduced for 6 community councils within the area
including Biggar, Quothquan and Thankerton, Duneaton, Leadhills, Crawford and
Elvanfoot and Symington. Community councils could apply for a £5,000 grant per
annum to award to small projects within their area at a maximum of £500.   
5.4. During 2022/2023, 5 grants were made to community councils within the area
totalling £23,974; details are provided in Appendix 4. 
5.5. Taking CWFF grants and the micro grants awards together a total of 16 grants were
awarded with a value of £271,979. This is a slight decrease on the 17 grants and a
total grant value of £367,298 reported in 2021/2022. There is strong pipeline of large
projects which will be seeking funding from this fund in 2023/2024. 
6. Annual Report publicity
6.1. With the purpose of raising the awareness of the Community Benefit Funds and their
support of communities a publicity document for 2022/2023 will be prepared
highlighting projects funded in the year or recently completed.   
6.2. This annual report will be circulated and publicised digitally, and 50 hard copies will
be made available for Councillors and groups. 
7. Employee Implications
7.1. The Funds will continue to be managed within existing resources. 
8. Financial Implications
8.1. There are no financial implications to the Council.  No funding offers are issued
without income from the respective developments being in place.
63

Page 64

9. Climate Change, Sustainability and Environmental Implications
9.1. Environmental sustainability is one of the appraisal considerations and applicants
are encouraged to consider and include good environmental practices within
projects. In the current year there are several projects which have helped deliver
environmental improvements or energy efficiency for groups. These include: - 
 Rural Development Trust Sustainable Travel
 Auchengray Church Centre Trust Activity shelter and photovoltaic (PV) 
Panels
 Climate Action Strathaven Eco Hub electric vehicle (EV) Charge   
Points 
10. Other Implications
10.1. The risks falling on the Council in the administration of Community Benefits are
reputational. Management of the funds are subject to the Council’s normal financial
scrutiny and reporting arrangements. By not undertaking this work, the Council
would not be acting consistently in support of its adopted policy and there would be
a risk that funds would not be distributed timeously and equitably to eligible
community organisations. 
11. Equality Impact Assessment and Consultation Arrangements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
11.2. All necessary and appropriate consultations are undertaken within the Council, with
partner organisations and community groups. 
David Booth
Executive Director (Community and Enterprise Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes 
 Focused on people and their needs
 Ambitious, self-aware and improving
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
Previous References
 Community and Enterprise Resources Committee -9 August 2022 
List of Background Papers
 List of all projects supported by the REF Community Benefit Funds
 List of all projects supported by the Clyde Windfarm Community Fund 
64

Page 65

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Colin McFarlane, 
Project Development Officer, 
Enterprise and Sustainable Development Services
Ext: 4759 (Tel: 01698 455922)
E-mail: colin.mcfarlane@southlanarkshire.gov.uk
65

Page 66

66

Page 67

Appendix 1 – REF Grants 2022/2023
Organisation Name Windfarm Type of
Group
Project
Location 
Project Details Project
Cost
Grant
Approved
Intervention
Rate %
Crawfordjohn Public Hall Association Andershaw Community Crawfordjohn Floor Cleaner and Tables £6,152 £6,152 100
Douglas Water Golf Club Andershaw Sport Rigside Storage Equipment £6,448 £6,448 100
Rigside Primary School Parent Council Andershaw Community Rigside Residential Trip £3,804 £3,804 100
Paradventures Andershaw Community Lanark All Terrain Wheelchair
Frames
£10,000 £10,000 100
Youth Family & Community Learning
Rigside
Andershaw Community Rigside Youth Club Equipment £6,053 £6,053 100
Leadhills Golf Club Andershaw Sport Leadhills Leadhills Golf Club
Demolition
£41,231 £10,308 25
Coalburn Miners Bowling Club Andershaw Sport Lanark Machinery and Green Works £33,239 £19,943 60
Leadhills Golf Club Andershaw Sport Leadhills Golf Machinery Replacement £97,537 £48,768 50
Douglas St. Bride's Community Group Andershaw Community Douglas Upgrade to Doors and
Lighting 
£21,062 £11,062 53
Rural Development Trust Andershaw Trust Douglas
Water
Make Your Way £51,198 £19,750 39
Auchlochan Residents Group Auchrobert Community Lesmahagow Outdoor Equipment £6,610 £4,957 75
Lesmahagow Farmers Society Auchrobert Community Lesmahagow Picnic Tables and Benches £10,069 £10,000 99
Rural Development Trust Auchrobert Trust Douglas
Water
Sustainable Travel £46,968 £19,500 42
Strathaven Business Association Bank End Rig Community Glassford Christmas Lights £9,887 £9,887 100
Carnwath Bowling Club Blacklaw Sport Carnwath Public Restroom Facilities
Upgrade
£9,967 £9,967 100
Castlehill Bowling Club  Blacklaw Sport Carluke Centenary Celebration   £2,880 £2,880 100
Equitots Lanarkshire Community
Interest Company
Blacklaw Community Carluke Stable Minds £3,088 £2,338 76
Auchengray Church Centre Trust Blacklaw Community Carnwath Activity shelter & PV Panels £3,540 £3,540 100
Willie Waddell Memorial Committee Blacklaw Community Forth Memorial Costs  £62,121 £9,683 16
Youth Family and Community Learning
Lanark
Blacklaw Community Lanark Event Costs & Equipment £9,525 £9,525 100
2nd Lanark Scout Group Blacklaw Community Lanark World Scout Jamboree 2023 £708 £708 100
Crossford, Hazelbank and District War
Memorial Group
Blacklaw Community Carluke War Memorial Restoration £4,884 £4,884 100
Forth and District Development Trust Blacklaw Community Lanark Mining Memorial Project £59,968 £19,968 33
Larkhall Youth Pipes and Drums Blantyre Muir Community Larkhall Instruments £6,127 £6,127 100
Larkhall Community Growers Blantyre Muir Community Larkhall Positive Future Consultation £9,500 £9,500 100
9
67

Page 68

Organisation Name Windfarm Type of
Group
Project
Location 
Project Details Project
Cost
Grant
Approved
Intervention
Rate %
Hillhouse Link  Burnbrae Community Hamilton Hillstop Cafe Costs £2,400 £2,400 100
The Rotary Club of Strathaven  Calder Water Community Strathaven Themed Garden  £60,974 £19,974 33
Avendale Old Parish Church Calder Water Community Strathaven Disabled Toilet £8,250 £8,250 100
Sandford and Upper Avondale
Community Council 
Calder Water Community Sandford Playpark Development  £101,777 £61,066 60
Trinity Church Couplaw, Garlewood,
Blantyre Muir
Community Larkhall Ventilation Project £8,354 £8,354 100
Coalburn Miners Welfare Charitable
Society
Gallawhistle Community Lanark Hall Refurbishment  £13,260 £10,000 75
Larkhall Academy Garlewood Community Larkhall Duke of Edinburgh £4,700 £4,700 100
Families Like Us Greenhall Veiw Community Hamilton Laundry Facilities £5,317 £5,317 100
Raploch Bowling Club High Blackwoodsyards Sport Larkhall Path Access £23,250 £5,000 21
Strathaven Bowling Club Kype Muir Sport Strathaven Clubhouse & Green
Renovations
£10,275 £10,000 97
Outreach Community Church Kype Muir Community Strathaven Peer Support Groups £7,944 £7,944 100
Strathaven Balloon Festival Kype Muir Community Strathaven Festival Equipment £4,905 £4,905 100
Hope Hub Blackwood and Kirkmuirhill Kype Muir Community Blackwood A Warm Space (Audio/Visual
equipment)
£1,500 £1,500 100
Sandford Village Hall Association Kype Muir Community Sandford Hall Minor Works £7,064 £7,064 100
Climate Action Strathaven Kype Muir Community Strathaven Eco Hub EV Charge Points £1,784 £1,284 72
Sandford Village Hall Association Kype Muir Community Strathaven Sandford Village Hall
Refurbishment
£88,867 £49,167 55
Forth Breast Cancer Care Group Muirhall Stallashaw Community Forth Property Purchase £61,958 £19,958 33
Quarter Parish Church Fundraiser
Committee
Whitelee Community Hamilton  Installation of heart
defibrillator 
£3,800 £3,800 100
Blantyre Miners welfare charitable
society
Whitelee Community Blantyre Remembrance Monument £5,142 £4,642 90
Rivals School of Martial Arts Whitelee Sport East Kilbride Window and Roof
Refurbishment
£22,500 £10,000 44
Meikle Earnock Community
Connections
Whitelee Community Hamilton Easter Event £2,524 £2,524 100
East Renfrewshire Council (Whitelee
Access Project)
Whitelee Local
Authority
Thornliebank Whitelee Countryside Ranger
Service
£202,746 £72,988 36
East Kilbride Bowling Club Whitelee Sport East Kilbride Toilet Refurbishment £10,230 £10,000 98  
68

Page 69

Appendix 2 – REF Micro Grants 2022/2023
Organisation Name Windfarm Type of Group Project Location Award (£)
Blackwood, Kirkmuirhill and Boghead Auchrobert Community Council Blackwood, Kirkmuirhill and Bogend £4,620.33
Douglas Auchrobert  Community Council Douglas £4,491.28
Lesmahagow Auchrobert  Community Council Lesmahagow £5,000.00
Rigside and Douglas Water (Residents Assoc) Auchrobert  Tenants & Residents Association Rigside and Douglas Water  £4,750.00
Sandford and Upper Avondale  Auchrobert  Community Council Sandford and Upper Avondale  £5,000.00
Stonehouse  Auchrobert  Community Council Stonehouse  £4,998.00
Carluke Black Law  Community Council Carluke £3,250.00
Forth Development Trust Black Law  Trust Forth £5,000.00
Lanark Black Law  Community Council Lanark £4,970.98
Larkhall Black Law  Community Council Larkhall £5,492.80
Tarbrax  Black Law  Community Council Tarbrax  £4,189.85
Burnside  Blantyre Muir  Community Council Burnside  £1,089.50
Halfway Blantyre Muir  Community Council Halfway £5,000.00
Hillhouse   Blantyre Muir  Community Council Hillhouse   £5,000.00
Uddingston Blantyre Muir  Community Council Uddingston £4,532.00
Strathaven and Glassford Calder Water  Community Council Strathaven and Glassford £5,000.00
Black Mount Muirhall Stallashaw  Community Council Black Mount £1,679.30
Blantyre Whitelees  Community Council Blantyre £5,000.00
Bothwell Whitelees  Community Council Bothwell £5,000.00
Cambuslang Whitelees  Community Council Cambuslang £5,000.00
Earnock Residents Association Whitelees  Community Council Earnock Residents Association £5,000.00
East Mains  Whitelees  Community Council East Kilbride £1,200.00
Jackton and Thortonhall Whitelees  Community Council Jackton and Thortonhall £1,000.00
Meikle Earnock Whitelees  Community Council Hamilton £5,000.00
Rutherglen Whitelees  Community Council Rutherglen £2,000.00 
69

Page 70

Appendix 3 - Clyde Windfarm Grants
Organisation Name Windfarm Type of Group  Organisation
Town 
Project Details Project
Cost 
Grant
Approved
Intervention
Rate %
Coulter Village Development Group Clyde Community Coulter Defibrillator £4,263 £4,263 100
Biggar Golf Club Clyde Sport Biggar Toilet upgrade £21,249 £15,937 75
Tinto Primary School and Nursery
Class
Clyde Community Biggar Tinto Community Sensory Garden £39,710 £29,783 75
Leadhills Golf Club Clyde Sport Biggar Golf Machinery Replacement. £97,537 £48,768 50
Biggar Science Festival Clyde Community Biggar Event Equipment £23,214 £10,000 43
Glenbuck and Douglas Football
Academy
Clyde Sport Douglas Floodlight Feasibility Impact Study £15,970 £5,970 37
Symington Community Council Clyde Community Symington Paly Park Development £123,262 £74,000 60
Abington Primary School Clyde Community Abington Stained Glass Window Project £10,154 £10,154 100
Biggar Kirk Gillespie Centre Clyde Community Biggar Facilities Equipment £6,923 £6,923 100
Crawford Primary School Clyde Community Biggar Stained Glass Window Project £11,285 £11,285 100
Leadhills Golf Club Clyde Sport Biggar Leadhills Golf Club Demolition £41,231 £30,923 75 
70

Page 71

Appendix 4 – Clyde Micro Grants 2022/2023
Community Council Windfarm Type of Group Project Location Award (£)
Biggar  Clyde  Community Council Biggar  £4,486.08
Carmichael Clyde  Community Council Carmichael £5,000.00
Duneaton CC Clyde  Community Council Duneaton CC £4,488.30
Leadhills Clyde  Community Council Leadhills £4,999.98
Thankerton and Quothquan Clyde  Community Council Thankerton and Quothquan £5,000.00 
71

Page 72

72

Page 73

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 30 May 2023
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Council Cemetery Strategy 2023 to
2033 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval of the Cemetery Strategy for South Lanarkshire which will cover
the period 2023 to 2033
[1purpose]
2. Recommendation
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Cemetery Strategy for South Lanarkshire for the period 2023 to
2033 be approved, including a catchment approach to managing cemetery
capacity; and
(2) that further work be undertaken to develop a Bereavement Services Strategy
and that this be presented to a future meeting of the Committee for approval. 
3. Background
3.1.  South Lanarkshire Council operates a Bereavement Service that provides a dignified
and sensitive burial and cremation service. It is intended to develop a service wide
Bereavement Services Strategy and the first phase of that process has been the
completion of a Cemetery Strategy for elected member approval. It is anticipated the
Bereavement Services Strategy will be presented to Community and Enterprise
Resources Committee by March 2024. 
3.2. The key piece of legislation governing the service is The Burial and Cremation
(Scotland) Act 2016 which was passed by the Scottish Parliament on 22 March 2016.
In July 2016, a Working Group was formed to commence work on the regulations of
the Act. Priority was given to implementing part two of the 2016 Act on Cremation,
resulting in the Cremation (Scotland) Regulation 2019. The COVID-19 pandemic
disrupted and delayed progress, however, the current iteration of the Burial
Regulations Working Group, set up in December 2021, seeks to continue the work of
the previous Working Groups. Its remit is to inform the regulation of burial authorities
and grounds in Scotland, the development of statutory guidance and the creation of a
Code of Practice for burial authorities. 
3.3. Whilst the legal requirement is to provide burial ground within the authority, there is no
legal requirement for the Council to provide burial ground within each town or within
any specific area. The Burial and Cremation (Scotland) Act 2016 states that for the
provision of burial ground each local authority: -  
10
73

Page 74

 must provide one burial ground within the area of the local authority
 may provide other burial grounds within that area. 
3.4. The right of burial can only be sold by the local authority and at present rights are sold
in perpetuity, however, on implementation of the full Burial and Cremation (Scotland)
Act 2016 rights will be sold on a lease basis of 25 years (excluding lairs owned by the
Commonwealth Graves Commission, these rights will remain in perpetuity). If a lair is
unused within a 25-year period, would then write to lease holder prior to expiry to
confirm intention to use. 
3.5. Under the Act, and previously the National Assistance Act 1984, the Council area has
a legal obligation to provide a burial or cremation for anyone who dies within our
authority who has left no funds for their funeral nor anyone willing to apply for a service.
Working with other partners in the Police, Hospitals, Care Homes, and Social Work
Departments along with family and friends we arrange a dignified service for the
deceased ensuring any religious and cultural beliefs or preferences are recognised
and respected. 
4. Cemetery Strategy – key points
4.1. South Lanarkshire is an area of 684 square miles with a population of 322,630 as at
2021. There are 55 cemeteries within the South Lanarkshire area (see table at 4.6 of
the Appendix for more detail) in which services are delivered and these include
churchyards, small rural cemeteries, and large urban cemeteries. Within the 55
cemeteries there are 11 Church yards and 2 cemeteries which are privately owned for
which the Council carries out excavation works required for burials. 
4.2. With an ageing population demand for bereavement services is increasing year on
year. In 2021 the service undertook 1,749 (63%) cremations and 1,022 (37%) burials.
Demand for cremations is increasing over time whilst the demand for burials is
reducing and the is trend is expected to continue. 
4.3. There are currently over 105,000 existing lairs across all South Lanarkshire
cemeteries and a further 4,024 new lairs available. There are on average 1,154
interments every year and of those 342 are new lairs. More detailed information is
provided within the appended Strategy. 
Catchment approach to cemetery capacity
4.4. A key aim of the Council’s strategic approach to cemetery provision is establishing
catchment groupings in relation to their geographical location within the authority area. 
74

Page 75

This approach will allow an area-based measurement of lair availability and usage
within each catchment, providing appropriate medium and long-term burial provision
within communities. 
4.5. Proposed South Lanarkshire Cemetery Catchments showing cemeteries within that
catchment is shown below:- 
Hamilton/
Blantyre  
East
Kilbride  
Cambuslang
/Rutherglen   Strathaven   Larkhall/
Stonehouse 
Bent East Kilbride Rutherglen Chapelton Glebe* 
Priestfield Philipshill Westburn Glassford Larkhall 
High Blantyre Philipshill ext  Strathaven Stonehouse 
West    Glebe* 
New lairs
available   1,772 1,208 323 150 338
Average
new lairs   122 68 37 4 29
Capacity
(Years)   14.5 17.7 8.7 37.5 11.6 
*Glebe has the capacity to serve Strathaven and Larkhall/Stonehouse catchments   
Clydesdale 
Catch A Catch B Catch C Catch D Catch E Catch F Catch G 
Carnwath  Carluke  Carmichael Biggar  Douglas Lamingto
n
Crawford/
Kirkton 
Dolphinton  Lanark  Carstairs Coulter  Douglas
St Bride’s Roberton  Crawfordj
ohn 
Dunsyre  Springbank Carstairs
Avenue Rd Symington  Lesmahagow Wiston  Elvanfoot
Walston   Covington  Symington
St John’s   Leadhills 
Wilsontown Libberton       
  
Pettinain           
   
  
  
  
  
New lairs
available  250 371 69 179 170 164 147
Average
new lairs  10 25 6 8 27 3 3
Capacity
(Years)  25 14.8  11.5 22.3 6.3 54.6 49  
4.6. Work is also underway or anticipated in the future to increase capacity in the following
cemeteries:- 
 Philipshill cemetery extension is expected to be completed by March 2024
providing an additional 1,117 new lairs.
 Planning permission has been granted for an extension at Douglas cemetery to
provide an additional 391 new lairs. As there is sufficient capacity in the
catchment currently, it is proposed to begin work on the extension in 2 to 3 years.
 Springbank Cemetery has the potential maximum capacity of 8,000 lairs within
the Councils existing land ownership. This will require enabling infrastructure at
the appropriate time to increase capacity.
75

Page 76

Increasing existing capacity
4.7. The Council will also undertake 2 new areas of work to increase new lair provision
within our existing cemeteries. The first will see a pro-active approach to recovering
underutilised space within individual cemeteries. Recent work in this area has
identified the potential creation of 28 new lairs within Strathaven Cemetery. Similar
investigatory work in Rutherglen Cemetery has identified potentially 65 to 70 new lairs
and a further 100 at Philipshill. This additional lair provision will further extend the life
capacity of cemeteries shown in section 4.5. A programme of work will now be
developed to identify further opportunities to increase new lair capacity from existing
cemetery provision. 
4.8. Furthermore, within the legislative framework Councils have the powers to reclaim
burial ground for which the right of burial has been purchased in advance and where
no interments have taken place over a period of time. Within the Councils current
management rules this period of time is 40 years, however, this is believed to be too
short a timeframe. To give families extra security, the management rules will be
updated to increase the period of inactivity to 60 years and the Council will now begin
the legal process to reclaim lairs unused after this timeframe or longer. 
4.9. The catchment with the shortest capacity in years is Group E (Douglas and
Lesmahagow) with a capacity of 6.3 years. As outlined in section 4.12 of the report,
an extension is planned at Douglas Cemetery that will increase catchment capacity by
a further 14 years. The catchment approach and the work identified in sections 4.7
and 4.8 of the report suggest that there are no immediate concerns around new burial
capacity in South Lanarkshire. It is proposed that capacity will now be formally
reviewed every 5 years. Each review process will consider whether existing provision
is adequate based on current trends and whether further extensions or new provision
is required. 
4.10. Presently the Council permits the purchase of burial plots in advance in a limited
number of cemeteries. This has been further restricted following the COVID-19
pandemic, however, it is proposed to cease this practice and only allow purchase of
plots at the time of need. This will help ensure the effective management of capacity
within each catchment. 
Infrastructure and maintenance
4.11. The Council is also responsible for the ongoing and long-term maintenance of
associated infrastructures within cemeteries such as roads, footpaths and walls. Given
the age of many of our cemeteries, the maintenance requirements are increasing year
on year. Many of the boundary walls around churchyards both in urban and rural areas
are deteriorating with some cemeteries having sections closed or barriered off. 
4.12. The Council has allocated funding in the Capital Programme for new cemeteries,
extensions and infrastructure. This funding will be aligned with existing commitments
and proposals outlined in the Strategy:- 
 completion of Philipshill cemetery extension
 Douglas cemetery extension
 enabling infrastructure for the recovery of space within existing cemeteries
 ongoing infrastructure maintenance of roads, footpaths and walls 
4.13. It is anticipated that further funding may be required following the 5-year capacity
review process if further capacity is required in the current cemeteries with expansion
capability (Springbank) or if new areas are identified as part of the process. The
76

Page 77

headstone inspection and stabilisation programme has been supported by annual
allocations from the Councils capital programme. The service will continue to explore
opportunities for funding essential works including the capital programme and existing
capital allocations. 
5. Employee Implications
5.1. No employee Implications as result of the contents of this report. 
6. Financial Implications
6.1. The capital funding allocation for cemeteries in 2023/2024 is £0.662 million and this
will be utilised for the completion of Philipshill cemetery extension, enabling works for
the recovery of new lairs in existing cemeteries and infrastructure investment to deliver
our statutory obligations. A further £1,148,000 is allocated for 2024/2025 and beyond,
and this will be utilised on the remaining areas outlined in section 4.12. 
Area of spend 2023/2024 Capital (£m)
Philipshill extension 0.553
Infrastructure investment to deliver statutory obligations
• Enabling infrastructure
• Footpaths
• Walls
0.109
Total 0.662m 
7. Climate Change, Sustainability, and Environmental Implications.
7.1. The Cemetery Strategy will support delivery of the Council’s Climate Change and
Sustainable Development Strategy and progress more sustainable options for
delivering services such as alternatives to coffin and burial provision and woodland
burials. 
8. Strategic Environmental Assessment
8.1. A screening determination was completed in relation to the Strategic Environmental
Assessment (SEA) which confirmed there is no need for a separate SEA for these
proposals. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. An equality impact assessment (EQIA) has been undertaken during the development
of the proposals to identify and mitigate any negative impacts and seek opportunities
to promote equality. 
9.2. The assessment is that the proposals do not have any adverse impact on any of the
protected characteristics groups. 
10. Other Implications
10.1. There are no other significant implications as result of the contents of this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
15 May 2023 
77

Page 78

Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kevin Carr
Head of Facilities, Waste and Grounds Services
Tel:-  01698 454708
E-mail:-  kevin.carr@southlanarkshire.gov.uk 
78

Page 79

Facilities, Waste & Grounds Services 
Bereavement Services
Cemetery Strategy
2023-2033  
10
79

Page 80

Contents 
Section  Title 
1.0 Introduction 
2.0 Purpose and Vision 
3.0 Legal Context 
4.0    Demographic Context, Demand, and Capacity 
5.0   Cemetery Rules and Areas for Development 
6.0   Cemetery Infrastructure and Maintenance 
7.0 Cemetery Strategy Short, Medium, and Long Term 
80

Page 81

1.0 Introduction    
1.1. This Cemetery Strategy is a strategic document which will assist the Council in providing,
maintaining, and managing its cemeteries over the long term. 
1.2. The Strategy includes all aspects of the management and operation of Council cemeteries,
including those which no longer have capacity and are closed to burials. These duties range
from administration of the burial process including memorial applications, maintenance,
health and safety, compliance checks and memorial testing. 
1.3. Cemeteries within the South Lanarkshire Council area are managed by Community and
Enterprise Resources. The administration of cemetery services is the responsibility of
Bereavement Services, and the maintenance is managed by Grounds Services. 
2.0 Purpose and Vision 
2.1. The South Lanarkshire Council Cemetery Strategy will set out the current provision,
legislation and the short term, medium term, and long-term needs for cemetery provision in
the Council area. 
2.2. The Council’s cemeteries are an integral part of our community infrastructure, and the Council
is committed to providing our services with dignity, respect, competency, and efficiency. 
2.3. Our service is also at the heart of the community and as such we offer a high standard of
care and options to ensure that each member of the community can have a funeral which is
meaningful to them and their family. 
2.4. With the legal responsibility to provide burial ground, the Council is committed to ensuring
there is adequate provision within each geographical area of the authority. 
2.5. Our vision is to meet the on-going and changing needs of the bereaved and the wider
community within South Lanarkshire. 
3.0 Legal Context 
3.1. The Burial and Cremation (Scotland) Act 2016 was passed by the Scottish Parliament on 22
March 2016 and received Royal Assent on 28 April 2016. 
3.2. In July 2016, a Working Group, headed by the Scottish Government, was formed to
commence work on the regulations of the Act. Priority was given to implementing part two of
the Act focusing on Cremation, resulting in the Cremation (Scotland) Regulation 2019. 
3.3. As a result of the Covid 19 pandemic this disrupted and delayed progress, however the
current iteration of the Burial Regulations Working Group, set up in December 2021, seeks
to continue the work of the previous Working Groups. The remit of the group is to inform the
regulation of burial grounds and authorities in Scotland, the development of statutory
guidance and the creation of a Code of Practice for burial authorities. 
3.4. Whilst the legal requirement is to provide burial ground within the authority, there is no legal
requirement for the Council to provide burial ground within each town or within any specific
area. The Burial and Cremation (Scotland) Act 2016 states that for the provision of burial
ground each local authority:
 must provide one burial ground within the area of the local authority, and;
 may provide other burial grounds within that area. 
81

Page 82

3.5. The Burial and Cremation (Scotland) Act 2016 also provides for two or more local 
authorities to provide burial ground jointly.
3.6. All burials must be authorised by the appropriate local authority and under the Act this will
cover private burials (those burials which occur in any land other than a cemetery). The
Council is required to keep a register for private burials. 
3.7. The right of burial can only be sold by the local authority and at present rights are sold in
perpetuity however on implementation of the full Burial and Cremation (Scotland) Act 2016
rights will be sold on a lease basis of 25 years (excluding liars owned by the Commonwealth
Graves Commission, these rights will remain in perpetuity). After the initial 25 years the lease
period can be extended every 10 years thereafter. 
3.8. The Burial and Cremation (Scotland) Act 2016 makes provision for inspection of a burial
authority which the council will require to comply with all, and any enactments, codes of
practice and guidance issued by the inspector. These inspections will be under the authority
of the Inspector of Burial, Cremation & Funeral Directors. 
3.9. Under the Act, and previously the National Assistance Act 1984, the Council area has a legal
obligation to provide a burial or cremation for anyone who dies within our authority who has
left no funds for their funeral nor anyone willing to apply for a service. Working with other
partners in the Police, Hospitals, Care Homes, and Social Work Departments along with
family and friends we arrange a dignified service for the deceased ensuring any religious and
cultural beliefs or preferences are recognised and respected. 
3.10. Whilst the full implementation of the burial section of the Act is still on-going the Council are
actively participating in the working group. 
4.0  Demographic Profile, Demand & Capacity
4.1. South Lanarkshire is an area of 684 square miles with a population of 322,630 as at 2021.  
4.2. There are 55 cemeteries within the South Lanarkshire area for which we provide operational
works, and these include churchyards, small rural cemeteries, and large urban cemeteries.
4.3. Within the 55 cemeteries there are 2 cemeteries which are privately owned and for which the
Council carries out excavation works required for burials. Cemetery coverage is shown in the
map below.
82

Page 83

83

Page 84

4.4. The demand for bereavement services from 2007 to 2022 is shown in the chart below. 2020
can be considered an exceptional year due to the Covid pandemic, however there is a clear
trend over time of the demand for burials reducing with the demand for cremations increasing.
The national trend is also for increasing cremation demand is demonstrated by the figures
produced the Cremation Society which charts the progress of cremations throughout the UK
from the very first cremations. The latest statistics for Scotland are for 2021 and show that
from annual deaths of 63,587, 44,975 (70%) were cremations. This compares to 2007 where
annual deaths for Scotland were 56,313, 34,557 (61%) were cremations.  For comparison, of
the deaths administered in South Lanarkshire in 2021, there were 1,749 (63%) cremations
and 1,022 (37%) burials.   
4.5. Looking 10 years ahead, this trend is set to continue as the chart below demonstrates. 
4.6. There are currently over 105,000 existing lairs across all South Lanarkshire cemeteries and
a further 4,024 new lairs available. There are on average 1,154 interments every year and of
those 342 are new lairs. More detailed information on each cemetery is provided in the table
below. 
84

Page 85

85

Page 86

4.7. On-going land provision is becoming more difficult to source as available land use changes
for community requirements as well as the suitability of land to be used for burials. Therefore,
the Council is required to achieve maximum land use throughout the Council area and within
our existing cemeteries, whilst maintaining our legal obligation to provide burial ground.
4.8. A key aim of the Council’s strategic approach to cemetery provision is establishing catchment
groupings in relation to their geographical location within the authority area. This approach
will allow an area-base measurement of lair availability and usage within each catchment,
providing appropriate medium and long-term burial provision within communities. 
4.9. Proposed South Lanarkshire Cemetery Catchments showing cemeteries within that
catchment is shown below: 
Hamilton/
Blantyre East Kilbride
Cambuslang
/Rutherglen Strathaven
Larkhall/
Stonehouse 
Bent East Kilbride Rutherglen Chapelton Glebe* 
Priestfield Philipshill
(+extension) 
Westburn Glassford Larkhall 
West   Strathaven Stonehouse 
High Blantyre   Glebe* 
New lairs available 1772 1208 323 150 338
Average new lairs 122 68 37 4 29
Capacity (Years)  14.52 17.76 8.73 37.5 11.6       
*Glebe cemetery has capacity to serve both Strathaven and Larkhall/ Stonehouse areas.     
Clydesdale 
Catch A Group B Group C Group D Group E Group F Group G 
Carnwath Carluke Carmichael Biggar Douglas Lamington
Crawford/
Kirkton 
Dolphinton Lanark Carstairs Coulter
Douglas St
Brides Roberton Crawfordjohn 
Dunsyre  Springbank
Carstairs
Avenue
Road  Symington  Lesmahagow  Wiston Elvanfoot 
Walston  Covington
Symington
St Johns    Leadhills 
Wilsontown   Libberton          
Pettinain        
New lairs
available 250 371 69 179 170 164 147
Average
new lairs 10 25 6 8 27 3 3
Capacity
(Years) 25.00 14.84 11.50 22.38 6.30 54.67 49.00 
4.10. Work is also underway or anticipated in the future to increase capacity in the following
cemeteries; 
 Philipshill cemetery extension is expected to be completed by March 2024 providing an
additional 1,117 new lairs.
 Planning permission has been received for an extension at Douglas cemetery to provide
an additional 391 new lairs. As there is sufficient capacity in the catchment currently, it is
proposed to begin work on the extension in 2-3 years.
 Springbank Cemetery has the potential maximum capacity of 8,000 lairs within the Councils
existing land ownership. This will require enabling infrastructure at the appropriate time to increase
capacity. 
86

Page 87

4.11. The Council will also undertake two new areas of work to increase new lair provision within
our existing cemeteries. The first will see a pro-active approach to recovering underutilised
space within individual cemeteries. 
4.12. Recent work in this area has identified the potential creation of 28 new lairs within Strathaven
Cemetery. Similar investigatory work in Rutherglen Cemetery has identified potentially 65-70
new lairs and a further 100 at Philipshill. A programme of work will now be developed to
identify further opportunities to increase new lair capacity from existing cemetery provision.
4.13. Furthermore, within the legislative framework Councils have the powers to reclaim burial
ground for which the right of burial has been purchased in advance and where no interments
have taken place over a period of time. Within the Councils current policy this period of time
is 40 years, however this is believed to be too short a timeframe. It is proposed to increase
the period of inactivity to 60 years and the Council will now begin the legal process to reclaim
lairs unused after this timeframe or longer. 
4.14. The catchment with the shortest capacity in years is Group E (Douglas & Lesmahagow) with
a capacity of 6.3 years. As outlined in section 4.10, an extension is planned at Douglas
Cemetery that will increase catchment capacity by a further 14 years. The catchment
approach and the work identified in 4.8 and 4.9 suggest that there are no immediate concerns
around new burial capacity in South Lanarkshire. It is proposed that capacity will now be
formally reviewed every 5 years. Each review process will consider whether existing provision
is adequate based on current trends and whether further extensions or new provision is
required. 
5. Cemetery Rules and Areas for Development 
5.1. The Cemetery Rules and Regulations are the basis for the management of cemeteries. They
enable the public, funeral directors, and memorial masons to understand the rules that the
Council applies within all Council Cemeteries. In addition, Council Officers follow these rules
and regulations to ensure the cemeteries are managed and operated in a common sense,
practical and sympathetic manner. The following areas are covered within our Rules and
Regulations. 
 Layouts of cemeteries and designation of plots
 Rights of Burial
 Burials
 Memorialisation
 Preparation of lairs
 Register of burials
 Charges and Fees 
5.2. Cemetery Charges and Fees 
5.2.1. Fees and charges are reviewed and set annually and linked to the need for investment
in our cemeteries to meet the needs of our bereaved and wider community. 
5.2.2. All fees and charges will be determined by balancing what is a reasonable charge and
the cost of managing and operating the cemeteries. 
5.3. Memorial Mason Registration Scheme 
5.3.1. Bereavement Services are responsible for the management of headstone placement
within our cemeteries.  As a burial authority we have a duty of care for the safety of
both visitors and staff to any cemetery.  
87

Page 88

5.3.2. To meet this duty of care in 2015, a Memorial Mason Registration Scheme was set up
whereby memorial masons would require register with South Lanarkshire Council prior
to them carrying out any works within our cemeteries.  This registration allows the
service to check that memorial masons carry out works within our guidance; that their
work conforms to the appropriate standard, and that they have the appropriate public
liability insurance. 
5.3.3. In order meet our duty of care the Council conducts a headstone safety check as part
of a rolling five-year programme in all our cemeteries.  In doing so advance notice is
given to the public and councillors of the programme, whilst reporting the actions that
we take and those a family may require to take, following a headstone being deemed
unsafe. 
5.4. Rights of Burial 
5.4.1. Presently the Council permits the purchase of burial plots in advance in a limited
number of cemeteries. This has been further restricted following the  Covid-19
pandemic, however it is proposed to cease this practice and only allow purchase of
plots at the time of need. This will help ensure the effective management of capacity
within each catchment. 
5.4.2. The Council understands families may not want a traditional type of coffin or burial and
therefore we will explore alternative options such as sustainable and woodland burials
and environmentally friendly coffins, such as wicker or cardboard. Current burial
practice allows for the interments of full (coffin) and ashes interments.
5.4.3. The Council is committed to working with religious, ethnic, and culturally diverse
groups to provide a range of burial options that meet the needs of our community.
Currently the Council provides dedicated burial areas as detailed below.
 Chinese community in Priestfield Cemetery
 Coptic Orthodox Church in Bent Cemetery
 Muslim community in Bent Cemetery (the Muslim faith also requires, where
possible, for a burial to take place within 24 hours of death. 
5.4.4. Current procedures allow for the termination of the right of burial in lairs which have
not been used for 40 years. However, it is proposed to extend this to a period of 60
years to ensure a more appropriate time has elapsed. 
5.4.5. The process of terminating the rights of burial requires a letter to be issued to the
registered lair owner at the address held on record to advise on the intention. There is
also a further requirement to place adverts in two national newspapers and two local
newspapers asking for any lair holder to come forward. It is anticipated this process
will take 18 – 24 months to complete and will target the following cemeteries in the first
phase:
 Strathaven
 Rutherglen
 East Kilbride
 Lesmahagow 
88

Page 89

6.0 Cemetery Infrastructure and Maintenance 
6.1. The Council acknowledges that the appearance of cemeteries can be enhanced by good
maintenance which is in keeping with a peaceful and respectful environment. Maintenance
of cemeteries is provided by Grounds Services with cemetery staff specially trained due to
the nature of the work activities such as grave digging and liaising with bereaved families.
Duties included in this role are: 
 Digging graves
 Assisting interments
 Cutting graves
 Weeding and borders
 Topping up of graves
 Cleaning and tidying up
 Inspection of approved Memorial works
 Testing of Memorials and Headstones 
6.2. The Council is also responsible for the ongoing and long-term maintenance of associated
infrastructures within cemeteries such as roads, footpaths and walls. Given the age of many
of our cemeteries, the maintenance requirements are increasing year on year. Many of the
boundary walls around our churchyards both in urban and rural areas are deteriorating with
some cemeteries having sections closed or barriered off. 
6.3. The Council has allocated funding in the Capital Programme for new cemeteries, extensions
and infrastructure. This funding will be aligned with existing commitments and proposals
outlined in the strategy: 
 Completion of Philipshill cemetery extension
 Douglas cemetery extension
 Enabling infrastructure for the recovery of space within existing cemeteries
 Ongoing infrastructure maintenance of roads, footpaths and walls
6.4. It is anticipated that further funding may be required following the 5-year capacity review
process if further capacity is required in the current cemeteries with expansion capability
(Springbank) or if new areas are identified as part of the process. The headstone inspection
and stabilisation programme has been supported by annual allocations from the Councils
capital programme. The service will continue to bid for funding through this annual process
to support this ongoing programme of work. 
7.0 Cemetery Strategy Short, Medium, and Long-Term 
7.1. Short Term Strategy
 Catchment capacity to be reviewed every 5 years.
 Ceasing the pre-selling of lairs with any ownership only available at time of need to protect
our legal requirements.
 Complete extension at Philipshill Cemetery providing over 1000 new liars.
 Re-evaluate our existing cemeteries to recover underutilised space for new lairs and
smaller ashes only lairs
 Begin first phase process of terminating rights on lairs that have not been used after a
period of 60 years 
89

Page 90

7.2. Medium Term Strategy
 Douglas extension
 Explore options for the provision of alternative burial provision including woodland burial
sites
 Modernise and improve IT systems to provide better data for the service enabling more
effective reporting of performance.
 Reduce paper-based systems and replace with electronic systems including handheld
devices for front line staff.
 Update lair maps in all cemeteries
 Review charges in line with benchmarking of comparator authorities
 Progress a workforce plan to ensure continuity of services
 Continue headstone inspection programme 
7.3. Long Term Strategy
 Complete a Bereavement Strategy incorporating all elements of the service including
Crematorium provision. 
 Undertake the first 5-year review of cemetery catchment capacity
 Develop proposals for infrastructure investment (roads, footpaths, walls)
 Work with religious, ethnic, and culturally diverse groups to provide a range of burial and
cremation options that meet the needs of our community.
 Implement a Memorial Mason Registration Scheme 
90

Page 91

Report
Agenda Item 
To: Community and Enterprise Resources Committee 
Date: 30 May 2023 
Prepared by: Executive Director (Community and Enterprise
Resources)  
Subject: UK Levelling Up Fund Update   
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the outcome of round 2 of the UK Levelling Up Fund
 provide an update on future rounds 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the outcome of the bids be noted; and 
(2) that the information around potential future rounds be noted.   
3. Background
3.1. The UK Budget on the 3 March 2021 published the prospectus for round one of the
UK Levelling Up Fund (UKLUF), round 2 of UKLUF was launched on 24 March 2022
with a submission deadline of 6 July 2022.     
3.2. The initial prospectus provided an indicative budget of £4 billion for the UKLUF which
has subsequently been increased to £4.8 billion with £800 million set aside for
Scotland, Wales and Northern Ireland to (2024/2025). 
3.3. The UKLUF is a capital fund which focuses on projects that require up to £20 million
of grant funding with an additional 10% match funding required. The fund has 3 main
themes which are:- 
 transport investments
 regeneration and town centre investment
 cultural investment 
3.4. Successful bids for round one were announced in November 2021, in total £1.7 billion
funding was awarded to a total of 105 projects over the UK, 8 of which were in Scotland
at a value of £172 million.   
3.5. Within rounds one and 2 the number of UKLUF bids authorities can submit is linked to
the number of UK Parliamentary constituencies an authority has. South Lanarkshire
Council theoretically may have up to 5 bids funded through the UKLUF over the term
of the fund, each up to £20 million, one for each MP (including 1 cross Council bid for
the Dumfries, Clydesdale, and Tweeddale parliamentary constituency) and one
11
91

Page 92

transport bid which may be up to £50 million. However, it should be noted the UKLUF
has a limited allocation for Scotland and while South Lanarkshire is a priority area the
total funds available will not allow for multiple £20 million awards to all Scottish local
authorities.   
3.6. All local authorities within the UK can bid for funds, however, South Lanarkshire has
been identified as a priority 1 area this in theory provides South Lanarkshire a certain
advantage within the bid decision process.   
4. Round 2 Outcome summary 
4.1. The Council submitted bids worth £45.4 million to the UK Government for the following
3 projects: - 
Shawfield Remediation and Development project value £16.2 million 
In partnership with Clyde Gateway Urban Regeneration Company this bid would
progress addressing the legacy of chromium contamination at Shawfield. The project
sought to purchase and remediate land, build industrial infrastructure and undertake
remedial work on Polmadie Burn, the project would have accelerated site remediation,
delivered environmental improvements, and created industrial space and employment
opportunities.   
EV@SL electric vehicle charging project value £21.7 million
The bid sought to position South Lanarkshire as leading on electric vehicle charging
provision and the transition to net zero through ambitious electrical vehicle charging
infrastructure. The project would build four super hubs one in each geographic area
and a network of fast and rapid charging points in all communities across South
Lanarkshire. The bid incorporated electric vehicles for the Council’s fleet and electric
vehicles for third sector partners to support the transition to net zero.   
Three Rivers, Clydesdale Way South Lanarkshire project value £7.5 million 
The bid coordinated and submitted by Dumfries and Galloway along with Scottish
Borders Council with combined value of £23 million sought to develop community and
visitor infrastructure within the three Councils rural area. Within South Lanarkshire the
bid aimed to complete the missing path links to the long-distance path network,
connect the Clyde Walkway at New Lanark to the Southern Upland way near Leadhills
and connecting to the John Buchan Way near Biggar and River Ayr Way near Glespin.
The path network would support active travel between rural villages and generate
increased visitor and tourism infrastructure supporting communities and the local
economy.   
4.2. Each bid was developed with consultation with the UK Government’s Scottish Office
and in consultation with partners and each bid included 10% match funding.   
4.3. All the bids were submitted on time and with extensive supporting technical, financial,
and economic documentation as required by the guidance documentation.   
4.4. The second round approvals were announced on 18 January 2023 where 10 Scottish
local authorities secured grants totalling £177 million (approximately 8%) of the £2.1
billion UK total. No authority that had been successful in round one was successful in
round 2. None of South Lanarkshire bids were successful.  
4.5. Written feedback was received from the UK Government on each of the bids and
meetings reviewing the details of bids held with Government officials in April 2023 a
summary of the feedback for each project is provided next. 
92

Page 93

4.6. Shawfield Remediation and Development 
This was a strong bid across all areas assessed. Key elements that could be
strengthened include the level of stakeholder engagement or evidence of this
engagement, and the drawing of more explicit links between the bid and the Levelling
Up agenda. 
4.7. EV@SL electric vehicle charging
More detail of the economic benefits of the proposal as well as further information on
delivery plans would strengthen the bid. 
4.8. Three Rivers, Clydesdale Way 
This was a strong bid across all areas assessed. Key elements that could be
strengthened include the provision of additional supporting data and more detailed
explanations which demonstrate the links between the three individual Councils
project elements. 
4.9. The feedback received from UK Government officials recognised that all projects
where strong, eligible, and thoroughly developed and included the required supporting
documentation the areas identified within the feedback to strengthen the bids were
small areas of the overall bids. 
4.10. During the bid assessment process after all the applications had been submitted the
UK Government made a significant change to the decision making, deciding no
Council could receive more than one award from UKLUF. In particular this impacted
on the Councils Three Rivers bid as the partnership submission was led by Dumfries
and Galloway Council and they were successful on another bid within round 2
effectively ruling out the Three Rivers and Clydesdale Way from consideration. 
5. UK LUF Next Steps
5.1. A final round of the UKLUF is planned by the UK Government at this time the round
details and timescales for bids have not been published. However, some insight has
been gathered which is that the funds available to Scotland will be around £90 million
and the completion date of expenditure will remain March 2025. The completion
deadline in particular gives projects challenging restrictions especially as the
timeframe for bids and decisions has not been published.   
5.2. Clarity from the UK Government is required on bidding restrictions and guidance for
the next round, two areas likely to form part of the guidance that would inform the
Councils bidding strategy are the following.  Will the number of bids submitted by a
council be restricted and will the round be open to all Councils including those with an
existing UKLUF award. 
6. Employee Implications
6.1. The Council received £125,000 to support the development of UKLUF bids. A portion
of this has been used to recruit an Economic Development Officer for 23 months and
the remainder used to secure specialist advise to support applications and project
development as required. 
7. Financial Implications
7.1. The development of bids has been undertaken within the development funding
provided by the UK Government. At this stage there are no other financial implications.    
93

Page 94

8. Climate Change, Sustainability and Environmental Implications
8.1. The projects developed would have made significant contribution to the local
environment through the remediation of significant land contamination or assisting in
the support of reducing carbon emissions. 
9. Other Implications 
9.1. The scope and value of the new UKLUF provides a significant opportunity of capital
investment around economic development People and Place. Securing additional
funds these funds could support Council prioritise around the following areas:- 
 SME businesses support
 poverty and inclusion
 employability and training
 rural regeneration
 supporting a low carbon economy
 economic infrastructure 
10. Equality Impact Assessment and Consultation Arrangements
10.1. There is no requirement to carry out an impact assessment in terms of the updates
contained within this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work to recover, progress and improve
 We will work towards a sustainable future in sustainable places 
Previous References
 Members Briefing - UK Funds Briefing - 10 September 2021 
List of Background Papers
 None 
Contact for Further Information
Kenny Lean
Economic Development Manager (Rural and Funding) 
Sustainability and Economic Development Services 
E-mail:- Kenny.lean@southlanarkshire.gov.uk
94

Page 95

Report 
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 30 May 2023 
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Contract Award: Tanker Applied Roads Surface
Coatings to Scottish Borders Council 
1. Purpose of Report
1.1 The purpose of the report is to:-
[purpose]
 advise on action taken, in terms of Standing Order No 37(c) because of the
timescales involved, by the Executive Director (Community and Enterprise
Resources), in consultation with the Chair and an ex officio member, to award a
contract to Scottish Borders Council for Tanker applied Roads Surface Coatings
under Regulation 13 of the Public Contracts (Scotland) Regulations 2015
[1purpose]
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s):- 
(1) the following action taken, in terms of Standing Order 37(c), by the Executive
Director (Community and Enterprise Resources), in consultation with the Chair
and an ex officio member, be noted:-
 that the contract for Tanker applied Roads Surface Coatings was awarded
to Scottish Borders Council for the period 1 May 2023 to 30 April 2028.  
3. Background
3.1. The Council's Roads, Transportation and Fleet Services has a requirement for the
supply and application of liquid bitumen emulsion to carriageways to support
maintenance operations. 
3.2. There are 2 operations supported by this service: the supply and application of Bond
Coat for carriageway resurfacing and Binder for surface dressing operations. Both
operations are similar in nature and require specialised vehicles, which the Council
does not operate. It is considered uneconomical for the Council to purchase or lease
these vehicles due to the number of projects and limitation of use to summer months. 
3.3. The Council’s contract for this service has been with Scottish Borders Council since
2014, with the most recent contract having expired on 31 March 2023. 
4 Public Contracts (Scotland) Regulations 2015
4.1. The regulations govern how public bodies in Scotland procure goods, works and
services. Regulation 13(8) states that the Regulations will not apply to procurements
for the award of a contract between contracting authorities. This is known as the
“Hamburg exemption” and is subject to the following requirements:-
12
95

Page 96

 the purpose of the contract is to ensure that public services, which each of the
contracting authorities have to deliver, are provided within their common
objectives
 the co-operation is governed solely by considerations relating to the public
interest
 the contracting authorities perform less than 20% of the activities concerned on
the open market. The percentage of activities is determined by reference to the
contracting authority's average turnover for the 3 years prior to the date of
proposed contract award 
4.2. All of the above requirements are met by the contractual arrangement and Scottish
Borders Council have the capacity to undertake these works. 
4.3. The Council’s Standing Orders on Contracts section 3.7(b) sets out the arrangements
to award a contract under Regulation 13(8), which requires authorisation from the
Community and Enterprise Resources Committee. As the next meeting of the
Committee was 30 May 2023, approval was sought under Standing Order 37(c) to
award the contract from 1 May 2023. 
5. Employee Implications
5.1. There are no employee implications regarding the proposal. 
6. Financial Implications
6.1. The estimated value of the contract is £2 million which will be met from Roads,
Transportation and Fleet Services revenue budget. 
7. Climate Change and Sustainability and Environmental Implications
7.1. There are no climate change and sustainability and environmental implications
associated with this proposal. 
8. Other Implications
8.1. There are no other implications associated with the proposal. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. There is no requirement to carry out an impact assessment in terms of the proposals
contained within this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
10 May 2023 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
96

Page 97

List of Background Papers
 Stage 1 Standing Order 37(c) Contract award: Tanker applied Roads Surface Coatings
to Scottish Borders Council 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
E-mail:-  emma.smith@southlanarkshire.gov.uk
97

Page 98

98