Democracy Spraffa

Agenda Document Pack - Community and Enterprise Resources Committee - 17/03/2026

South Lanarkshire Council · 17 March 2026
Back to Community and Enterprise Resources Committee — 17 March 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 09 March 2026 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 17 March 2026
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John
Anderson, Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Andrea Cowan,
Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal
Johnston-Dempsey, Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian
McAllan, Kenny McCreary, Davie McLachlan, Carol Nugent, Kirsten Robb, Helen Toner,
David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lynsey Hamilton,
Lesley McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott, David
Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources
Committee held on 16 December 2025 submitted for approval as a correct
record.  (Copy attached) 
5 - 14 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2025/2026
Joint report dated 16 February 2026 by the Executive Directors (Finance
and Corporate Resources) and (Community and Enterprise
Resources).  (Copy attached) 
15 - 26 
4 Community and Enterprise Resources - Capital Budget Monitoring
2025/2026
Joint report dated 18 February 2026 by the Executive Directors (Finance
and Corporate Resources) and (Community and Enterprise
Resources).  (Copy attached) 
27 - 32 
5 Community and Enterprise Resources – Workforce Monitoring – 1
October to 31 December 2025
Joint report dated 3 February 2026 by the Executive Directors (Finance
and Corporate Resource) and (Community and Enterprise
Resources).  (Copy attached) 
33 - 40 
Item(s) for Decision 
6 Council Budget 2026/2027 - Infrastructure and Service Area
Investment
Report dated 26 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
41 - 48 
7 Community Benefit Funds – Renewable Energy Fund - Grant
Applications
Report dated 16 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
49 - 56 
8 Local Transport Strategy 2026 to 2036
Report dated 17 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
57 - 76 
9 Review of the Management of Trees
Report dated 23 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
77 - 84
2

Page 3

10  Appointment of Public Analyst and Food Examiner
Report dated 24 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
85 - 88 
Item(s) for Noting 
11  Enabling Commercial Space Programme – Project Update
Report dated 13 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
89 - 94 
12  Clyde Wind Farm South Lanarkshire - Net Zero Community Grant
Fund
Report dated 11 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
95 - 98 
13  Douglas Valley Community-Led Outdoor Recreation and Adventure
Tourism Project
Report dated 17 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
99 - 104 
14  Clydesdale Way – Project Update
Report dated 17 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
105 - 110 
15  Business Gateway Lanarkshire – 2025/2026 Interim Performance
Report
Report dated 13 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
111 - 120 
16  Flood Risk Management in South Lanarkshire
Report dated 17 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
121 - 134 
17  Active Travel Schemes in South Lanarkshire
Report dated 17 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
135 - 148 
18  Bereavement Services Update
Report dated 25 February 2026 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
149 - 154 
Urgent Business 
19  Urgent Business
Any other items of business which the Chair decides are urgent. 
3

Page 4

Exclusion of Press and Public 
20  Exclusion of Press and Public
It is recommended that the Committee makes the following resolution:-  
"That, in terms of Section 50A(4) of the Local Government (Scotland) Act
1973, the press and public be excluded from the meeting for the following
item(s) of business on the grounds that it is likely that there will be
disclosure of exempt information in terms of Paragraphs 6 and 9 of Part I
of Schedule 7A of the Act." 
Item(s) for Decision 
21  Hamilton Town Centre Masterplan Update
• Exempt information in terms of Paragraph 6 of Part I of Schedule 7A of
the Act
• Exempt information in terms of Paragraph 9 of Part I of Schedule 7A of
the Act 
For further information, please contact:-
Clerk Name: Stuart McLeod
Clerk Telephone: 07385 370 117
Clerk Email: stuart.mcleod@southlanarkshire.gov.uk 
4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 16 December 2025 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Andy
Carmichael, Councillor Ross Clark (substitute for Councillor Carol Nugent), Councillor Gerry
Convery, Councillor Andrea Cowan, Councillor Margaret Cowie, Councillor Maureen Devlin
(Depute), Councillor Colin Dewar, Councillor Gladys Ferguson-Miller, Councillor Ross Gowland,
Councillor Susan Kerr, Councillor Ian McAllan, Councillor Kenny McCreary, Councillor Davie
McLachlan, Councillor Kirsten Robb, Councillor David Shearer (substitute for Councillor Hugh
Macdonald), Councillor Helen Toner, Councillor David Watson 
Councillors' Apologies:
Councillor Joe Fagan (ex officio), Councillor Graeme Horne, Councillor Cal Johnston-Dempsey,
Councillor Martin Lennon, Councillor Richard Lockhart, Councillor Hugh Macdonald, Councillor
Carol Nugent 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
F Carlin, Head of Planning and Regulatory Services; K Carr, Head of Facilities, Waste and Grounds
Services; K Lean, Economic Development Manager (Funding and Rural); C Park, Head of Roads,
Transportation and Fleet Services
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); L Harvey, Finance Manager (Resources); E Maxwell, HR
Business Manager; G Robertson, Personnel Adviser; T Slater, Administration Adviser; N Tollan,
Administration Assistant, F ul Haque, Finance Adviser 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 7
October 2025 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Community and Enterprise Resources - Revenue Budget Monitoring 2025/2026 
A joint report dated 12 November 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April to 3 October 2025 and
providing a forecast for the year to 31 March 2026 for Community and Enterprise Resources. 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report.
2
5

Page 6

At 3 October 2025, the projected outturn position for the Resource was a breakeven position. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in the appendices to the report. 
The Committee decided: 
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in Appendix A of
the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference: Minutes of 7 October 2025 (Paragraph 3)] 
Prior to consideration of this item of business, Councillor Brown made a transparency statement to
advise that he was Chair of Rutherglen 900 
Councillor Ferguson-Miller joined the meeting during this item of business 
4 Community and Enterprise Resources - Capital Budget Monitoring 2025/2026 
A joint report dated 18 November 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ capital programme 2025/2026 and summarising the
expenditure position at 3 October 2025. 
The revised capital programme for 2025/2026 for the Resource, which amounted to £55.159
million, was based on the programme of projects approved by the Executive Committee on 25
June 2025 and adjustments approved by the Executive Committee on 5 November and 3
December 2025, as detailed in Appendix A to the report. 
Appendix A also provided a forecast for the financial year of £55.159 million and actual
expenditure to 3 October 2025 of £14.197 million. 
Information was also provided on the 2025/2026 investment funding provided to the Resource. 
The Committee decided: that the Community and Enterprise Resources’ capital
programme of £55.159 million, and forecast expenditure of
£55.159 million, be noted. 
[Reference: Minutes of 7 October 2025 (Paragraph 4) and Minutes of the Executive Committee
of 3 December 2025 (Paragraph 4)] 
5 Community and Enterprise Resources - Workforce Monitoring – August and
September 2025 
A joint report dated 4 November 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period August and
September 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
6

Page 7

 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 13 September 2025 
The Committee decided: that the report be noted. 
[Reference: Minutes of 7 October 2025 (Paragraph 5)] 
6 Community and Enterprise Resource Plan – Quarter 2 Progress Report 2025/2026 
A report dated 20 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on the Community and Enterprise Resource Plan Quarter 2 Progress
Report 2025/2026 for the period 1 April to 30 September 2025. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG) which indicated that an action had been completed. 
Details were provided on:- 
 progress against all Resource Plan measures contained in Quarter 2 Progress Report
2025/2026, as detailed in paragraph 5.2 and attached as Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in paragraph 5.3 of the
report
 the status of those measures identified as ‘report later’ at Quarter 4 2024/2025, as
summarised in paragraph 5.5 of the report 
There were no areas for improvement identified at Quarter 2. 
Officers responded to members’ questions in relation to various aspects of the report and the
Head of Roads, Transportation and Fleet Services undertook to provide a member with the list
of carriageway and footway maintenance works. 
The Committee decided: 
(1) that the Community and Enterprise Resource Plan Quarter 2 Progress Report 2025/2026,
as summarised in paragraph 5.2 and detailed in Appendix 2 to the report, be noted; 
(2) that the key achievements made by the Resource up to Quarter 2, as detailed at
paragraph 5.3 of the report, be noted; 
(3) that it be noted that there were no areas for improvement identified for the Resource at
Quarter 2; and 
(4) that the additional scrutiny of reporting the updated status of those measures identified as
‘report later’ at Quarter 4 2024/2025, as summarised in paragraph 5.5 and detailed in
Appendix 3 to the report, be noted. 
[Reference: Minutes of 13 May 2025 (Paragraph 6)] 
7 Scottish Government Vacant and Derelict Land Fund Programme 2025/2026
A report dated 25 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on the proposed use of the remaining funding available for the
Scottish Government Vacant and Derelict Land Fund (VDLF) programme 2025/2026.
7

Page 8

The Scottish Government had allocated £528,000 to the Council for the VDLF in 2025/2026 and
a Local Delivery Plan had been approved by the Committee on 12 August 2025 to implement
the following key objectives:- 
 tackle long-term vacant and derelict land
 stimulate economic growth and wealth creation
 develop a diverse sustainable environment with a focus on temporary and permanent
greening
 support communities to flourish and tackle inequalities 
At the meeting on 12 August 2025, the Committee also approved the following funding
allocations, which complied with the eligibility criteria for the fund:- 
 Clyde Cycle Park Phase 2 - £400,000
 Clyde Climate Forest - £25,000 
It was proposed that the remaining funding of £103,000 be allocated to the Red Tree Labs
project located within the Clyde Gateway area at Shawfield, Rutherglen, as outlined at section
4.2. of the report. 
The Committee decided: that the allocation of the remaining funding of £103,000 in
the 2025/2026 Vacant and Derelict Land Fund Delivery
Plan be awarded to the Red Tree Labs project. 
[Reference: Minutes of 12 August 2025 (Paragraph 8)] 
Prior to consideration of this item of business, Councillor Devlin made a transparency statement to
advise that she was a member of the Clyde Cycle Park Board and Councillors Brown and Cowie
made transparency statements to advise that they were both members of the Clyde Gateway Board 
8 Community Benefit Funds – Renewable Energy Fund – Grant Applications 
A report dated 25 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on 4 applications to the Renewable Energy Fund (REF).  This
community benefit funding, secured from windfarm developers, had been established to provide
funding to suitable projects providing community benefits in eligible areas. 
It was proposed that, subject to the applicants providing written confirmation that all other
additional funding for the projects had been secured, grants be awarded as detailed in the
report. 
The Committee decided: that, subject to the applicants providing written confirmation
that all other funding for the projects had been secured, a
grant be awarded of up to a maximum of:- 
 £85,680 towards eligible costs associated with the
upgrade of the biomass heating and hot water system
to Coalburn Miners’ Welfare Charitable Society from
Gallawhistle Windfarm
8

Page 9

 £695,536 towards eligible costs associated with the
redevelopment of Glassford Village Hall to Glassford
Community Group from Dungavel and Kype Muir
Windfarms
 £134,347.50 towards eligible costs associated with
the refurbishment of Douglas Water Hall to Lodge
Hozier Douglas Water from Gallawhistle Windfarm
 £46,977 towards eligible costs associated with the
Connecting Clydesdale transport project from
Blacklaw, Gallawhistle and Andershaw Windfarms 
[Reference: Minutes of 7 October 2025 (Paragraph 9)] 
9 UK Shared Prosperity Fund – Community Grant Application for Development of a
South Lanarkshire Food Partnership Network 
A report dated 25 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on a grant application to the UK Shared Prosperity Fund (UKSPF). 
Information was provided on a grant application received from Healthy and Active in East
Kilbride Limited, which was a lead partner for The Beeline to Nature Consortium, for the creation
and early development of a South Lanarkshire Food Partnership Network.  The scoring guide for
grant applications was attached as Appendix 1 to the report. 
It was proposed that £50,000 be awarded to Healthy and Active in East Kilbride Limited for the
development of a community South Lanarkshire Food Partnership Network. 
The Committee decided: that £50,000 be awarded to Healthy and Active in East
Kilbride Limited for the development of a community South
Lanarkshire Food Partnership Network. 
[Reference: Minutes of 13 May 2025 (Paragraph 10) and 17 September 2024 (Paragraph 10)] 
10 Cathcart Road Net Zero Industrial Development - Update 
A report dated 25 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the Cathcart Road Net Zero Industrial
Development project. 
Across South Lanarkshire, there was limited availability of industrial property.  In the last 18
months, the Council had received 182 property enquiries, with the majority looking for
accommodation less than 10,000sqm.  Only 3.8% of those enquiries were satisfied.  This
showed the strength of the SME (small or medium-sized enterprise) business community but
presented a significant challenge as businesses occupying those premises provided significant
employment opportunities.  Many of the properties were of considerable age and performed
poorly from a sustainability perspective and energy performance position. 
To address the lack of supply, the site of the former Cathkin Clean Laundry on Cathcart Road
had been identified as a suitable location for industrial units.  The site, which was owned by the
Council, was included in the Vacant and Derelict Land Register, and had been used as a
storage yard since the clearance of the previous uses.
9

Page 10

Proposals had been prepared to develop 2 industrial units each of 310sqm, with car parking for
12 vehicles and associated yard space.  This would be a building with net zero energy
consumption, meaning the total amount of energy used to construct and operate the building on
an annual basis would be equal to the amount of renewable energy created using technology
such as high efficiency windows, insulation and solar panels. 
The total cost of the project was estimated to be approximately £2 million and, to support the
delivery of the project, the Council had applied to the Scottish Government’s Regeneration
Capital Grant Fund (RCGF), securing an award of £963,000. 
Information was provided on the:- 
 progress to date which included securing planning permission, and the outcomes and
outputs expected to be achieved
 project timeline and next steps 
On completion, the units would become assets of the Council and would fall within the Housing
and Technical Resources’ Lease Portfolio. 
The Committee decided: that the progress being made to deliver the Cathcart Road
Net Zero Industrial Development project be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 7)] 
11 Pavement Parking 
A report dated 26 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the progress and enforcement of the national
prohibitions on pavement parking, double parking and parking at dropped kerbs under the
Transport (Scotland) Act 2019. 
At its meeting on 26 November 2024, the Committee noted that enforcement would commence
on 6 January 2025 and would be undertaken in a balanced, proportionate and pragmatic way. 
This approach would be kept under review by the Service. 
Through incoming enquiries, over 200 locations had been identified for Parking Attendants to
visit.  The Council also received a high volume of correspondence in relation to pavement
parking, resulting in additional locations added daily. 
2,500 warning notices had been issued to vehicles as part of the ‘soft approach’ taken by the
Council, however, due to the increasing level of demand for enforcement action from members
of the public, the Council had moved to full enforcement from 17 March 2025, issuing Penalty
Charge Notices. 
Information was provided on those areas which could be considered for exemption, the criteria
that would be applied when assessing those roads and the Traffic Regulation Order process that
would be required to make those roads legally exempt. 
Following a review of all roads in South Lanarkshire, an initial list of roads that were considered
to meet the criteria was provided at Appendix 1 to the report. 
The Head of Roads, Transportation and Fleet Services responded to members’ questions in
relation to various aspects of the report and undertook to:-
10

Page 11

 look at bringing a report to a future meeting considering ways to reduce congestion and
the use/ownership of cars generally
 contact a member in relation to a particular road in their ward 
The Committee decided: that the progress on enforcement and the planned
promotion of an exemption order be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 14) 
Councillor Brogan left the meeting during this item of business 
12 20mph Speed Limits
A report dated 26 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted advising on the progress towards the National Strategy for 20mph
speed limits and proposals for implementation within South Lanarkshire. 
On 25 February 2021, the Scottish Government launched Scotland’s Road Safety Framework to
2030, which set national targets and measures for casualty reduction that each roads authority
contributed towards.  Transport Scotland’s Strategic Transport Projects Review 2 (STPR2)
report had also included a recommendation to expand 20mph limits and zones in Scotland.  The
Council’s current Local Transport Strategy supported and encouraged driving at 20mph or below
in residential areas and outside schools. 
To deliver the National Strategy for 20mph speed limits, the Scottish Government had
established a task force to review methods used in setting 20mph speed limits elsewhere and
lessons learned. 
In 2022, Transport Scotland had written to all local authorities asking for road assessments to be
undertaken, using set criteria, on all existing 20mph and 30mph roads.  Following this
assessment and further reviews undertaken incorporating local insights into the road network in
South Lanarkshire, the relevant findings were outlined in the report, together with proposals for
initial implementation in South Lanarkshire. 
Any change to speed limits required the promotion of a Traffic Regulation Order (TRO).  This
process could take between 6 to 9 months to complete and was very resource intensive. 
Although, Temporary TROs could be used to expedite the process, this was not the preferred
option, with a phased implementation of TROs being favoured.  This involved consultation with
stakeholders and any feedback would be reviewed before making final decisions on whether to
proceed with or amend TROs. 
Significant financial resources would be required for the phased implementation, with projections
for a wide-scale roll-out being close to £4 million.  Funding would be required from the Scottish
Government. 
During an extensive debate, officers responded to members’ questions in relation to various
aspects of the report. 
In terms of Standing Order No 22, the Chair ruled that he did not consider a proposed
amendment from Councillor Robb to be competent for the following reasons:- 
 the report was for noting only with the content delegated to officers under the approved
Scheme of Delegation
 the policy direction was covered by the National Strategy
 there would be funding implications
11

Page 12

 there was a progressive element of the proposals which would require consideration of
future reports by committee 
The Chair advised that, as the issue progressed, further discussions could be held with officers,
with the differing views of members put forward as part of the debate being taken into
consideration prior to future reports being presented to committee. 
Councillor Robb advised that her amendment was in relation to the strategic direction of the
proposals where A and B class roads currently at 30mph would move to 20mph unless there
was a valid reason for the road remaining at 30mph and questioned the oversight of elected
members when looking at the application of the criteria for 20mph speed limits. 
The Executive Director (Community and Enterprise Resources) and Head of Roads,
Transportation and Fleet Services gave a commitment to engage with members, confirming that
any proposals would be consulted on with elected members prior to being taken forward.  As
previously stated, RTOs were also subject to public consultation. 
The Committee decided: that the progress towards the National Strategy for 20mph
speed limits and proposals for implementation be noted. 
[Reference: Minutes of the Roads Safety Forum of 4 November 2025 (Paragraph 4) 
Councillor Brogan re-joined the meeting during this item of business
Councillor Shearer left the meeting during this item of business 
13 Community and Enterprise Resources – Notification of Contracts Awarded – 1
April to 30 September 2025 
A report dated 25 November 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on contracts awarded by Community and Enterprise Resources in
the period 1 April to 30 September 2025. 
In terms of Standing Order Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources
were required to notify the relevant Committee of contracts awarded above the sum of £50,000. 
Details of the contracts awarded or extended were provided in Appendix 1 to the report. 
The Committee decided: that the details of the contracts awarded, as outlined in
Appendix 1 to the report, be noted. 
[Reference: Minutes of 12 August 2025 (Paragraph 20) 
14 Urgent Business 
There were no items of urgent business. 
Chair’s Closing Remarks
The Chair referred to the forthcoming retirement of David Booth, Executive Director (Community
and Enterprise Resources) and, on behalf of the Committee, thanked David for all his hard work,
support and commitment to the Council.
12

Page 13

Councillor Clark spoke on behalf of the SNP Group to record their thanks and appreciation to David. 
The Chair concluded the meeting by thanking everyone for their attendance and wishing them the
compliments of the season. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April 2025 to 23 January 2026 for Community and
Enterprise Resources
 provide a probable outturn forecast for the year to 31 March 2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the probable outturn forecast to 31 March 2026 of an underspend of
£0.348m after approved transfer to reserves as detailed at Appendix B of the
report be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2025/2026. 
3.2. The report details the financial position for Community and Enterprise Resources.
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendices B to G provide the detailed financial position
with variance explanations by budget category. 
3.3. This report reflects the actual spend to 23 January 2026 within the Resource budget,
as well as the output from the formal Probable Outturn exercise, which provides an
expected outturn forecast on expenditure and income at this date.   
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. Probable Outturn:  Following the Council’s formal Probable Outturn exercise, the
forecast for the budget to 31 March 2026 is an underspend of £0.348m after the
approved transfer to reserves.  The transfer to Reserves was approved at Executive
Committee (4 February 2026).  This position is outlined in the attached appendices. 
3
15

Page 16

5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. 2025/2026 Investments
6.1. Other Investments 
Funding has been allocated to Community and Enterprise Resources as part of the
2025/2026 Investments.  The Community and Enterprise budget includes £0.866
million for the following spend areas: Rutherglen 900, Extension to Frontline First Fund
and Fighting Fly-tipping.  The remaining £1.084 million of 2025/2026 investments
allocated to the Resource is profiled to spend in 2026/2027 and 2027/2028 (£0.896
million and £0.188 million respectively). 
6.2. Local Action Fund 
The budget presented in the appendices also includes amounts in relation to the Local
Action Fund.  The Revenue allocations for Community and Enterprise Resources total
£0.117 million and this is shown below:-   
Ward  Project £m
1 Local Skate Park 0.050
5 Public Place   0.008
7 Road Works   0.034
11 Railings 0.003
13 Painting of Railings/Pavillion Refurbishment 0.022  
0.117 
6.3. Services have been allocated the new funding as approved at the Executive
Committee and are spending these additional resources in line with Elected Members’
proposals. 
6.4. Total Investment funding of £0.983m is included in Community and Enterprise
Resources budget as outlined in Appendices B to G.  Spend will continue to be
progressed throughout the year. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however, these are mitigated by additional funds being added to the
budget. 
8.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no integrated impact
assessment is required. 
16

Page 17

9.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Kevin Carr
Executive Director, (Community and Enterprise Resources) 
16 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 23 January 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Louise Harvey, Finance Manager
Ext:  2658  (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
17

Page 18

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 11 Ended 23 January 2026 (No.11) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Facilities, Waste and Grounds Services  79,332  78,242 1,090 1.37% 58,002
Planning and Regulatory Services 5,235 4,257 978 18.68% 3,221
Leisure Services 20,090 20,062 28 0.13% 18,705
Enterprise and Sustainable Development 6,658 7,194 (536) -8.05% 5,928
Roads, Transportation and Fleet Services 19,751 19,845 (94) -0.47% 13,271
Net Controllable Exp. 131,066 129,600 1,466 1.12% 99,127 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by overspends
within Property, Supplies and Services, Transport, Payment to Contractors and an under recovery within
Bereavement and Private Care of Garden income. Detail of the overspends within the report. The
anticipated service underspend will support other areas of the Resource budget. 
Planning and
Regulatory Services
The anticipated underspend is mainly due to turnover and staff vacancies and greater income predicted
for Planning applications, partially offset by overspends within IT costs, legal costs and Payment to
Contractors. The anticipated Service underspend will support other areas of the Resource budget. 
Leisure Services No major significant variances to report.
Enterprise and
Sustainable
Development
The anticipated overspend is mainly due to dilapidation costs for Hamilton Towers, partially offset by an
underspend in staff costs due to turnover and staff vacancies. The anticipated Service overspend will
be supported by other areas of the Resource budget. 
Roads,
Transportation and
Fleet Services
The anticipated underspend is mainly due to increased income from capital and rechargeable works
within Roads Construction. The additional income is offset by increased costs for winter, street lighting
works, carriageway maintenance repairs and increased spend on sub-contractors within the Roads
Service. In addition, there are anticipated overspends for tyres, outside repairs, materials, fuel and
vehicle maintenance within Fleet, partially offset by increased income. 
18

Page 19

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 106,515 101,003 5,512 Under 5.17% 80,116 
Property Costs 9,504 10,522 (1,018) Over (10.71%) 7,828 
Supplies & Services 19,875 22,798 (2,923) Over (14.71%) 14,956 
Transport & Plant 22,983 24,846 (1,863) Over (8.11%) 15,482 
Administration Costs 928 1,169 (241) Over (25.97%) 807 
Payments to Other Bodies 17,224 17,766 (542)    Over (3.15%) 11,630 
Payments to Contractors 40,142 44,803 (4,661) Over (11.61%) 33,484 
Transfer Payments 625 625 0 - 0.00% 625 
Financing Charges 191 210 (19)     Over  (9.95%) 32 
Total Controllable Exp. 217,987 223,742 (5,755) Over (2.43%) 164,960 
Total Controllable Inc. (86,921) (94,142) 7,221 Over 8.31% (65,833) 
Net Controllable Exp. 131,066 129,600 1,466 Under 1.12% 99,127 
Transfer to Reserves - 1,118 (1,118)   
Position after Transfer to
Reserves 131,066 130,718 348 Under 0.54% 
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
Approved Transfers to Reserves 
Detailed in Appendix C-G as appropriate 
19

Page 20

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 68,513 64,690 3,823 Under 5.58% 51,649 1,a,,c,d
Property Costs 2,447 2,945  (498)  Over (20.35%) 1,891 2,d,e
Supplies & Services 11,047 11,682 (635) Over (5.75%) 7,192 3,a,c,d,e
Transport & Plant 8,546 9,479 (933) Over (10.92%) 6,400 4,d,f
Administration Costs 249 375 (126) Over (50.60%) 267 5,
Payments to Other Bodies 396 400 (4) Over (1.01%) 45 D
Payments to Contractors 19,978 20,252 (274) Over (1.37%) 14,201 6,d,e,f
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 45 52 (7) Over (15.56%) 9 
Total Controllable Exp. 111,221 109,875 1,346 Under 1.21% 81,654 
Total Controllable Inc. (31,889) (31,633) (256) Under (0.80%) (23,652) 7,d,f
Net Controllable Exp. 79,332 78,242 1,090 Under 1.37% 58,002 
Transfer to Reserves - 768 (768)   
Position after Transfer to
Reserves 79,332 79,010 322 Under 0.28% 
Variance Explanations 
1. The forecast underspend is across all service areas and is due to staff turnover, partially offset by an overspend in overtime.
2. The forecast overspend is due to price increases for cleaning and janitorial equipment within Facilities and works being undertaken at
Forrest Street depot.
3. The forecast overspend is due to higher than budgeted costs for the purchase and repair of equipment within Facilities, general
materials, bins and protective clothing throughout the services due to higher demand and increasing costs. 
4. The forecast overspend is mainly due to increased costs for vehicle maintenance and external hires within Waste and Grounds. In
addition, works are being carried out to fit air condition units within Waste refuse collection vehicles for health and safety reasons. 
5. The forecast overspend is due to printing costs for menu development and garden waste uplift licences, medicals and fees in relation
to parent pay. The garden waste uplift licences is offset by income.
6. The forecast over spend is mainly due to the upkeep of the Crematorium and for commemorative items. The latter is offset by
income.  
7. The forecast under recovery is mainly due to a reduced demand for private Care of Gardens service within Grounds and reduced
income within the Bereavement Services, with the exception of commemorative items, partially offset by a higher than forecast
demand for the Garden Waste Uplift Service and additional service requests from Housing and Technical Resources within Waste
and Streets. 
Budget Virements 
a. Transfer to corporate items in relation to Procurement savings and Employee budget in respect of Extended Producer Responsibility
Payments. Net effect (£0.619m): Employees (£0.545m), Supplies and Services (£0.074m).
b. Transfer from Education permanent budget in respect of facilities staff for Jackton Primary School. Net Effect £0.248m: Employees
£0.248m.
c. Redetermination of General Revenue Grant in respect of School Milk and Nature Restoration Fund. Net Effect £0.206m: Supplies and
Services £0.064m, Payment to Other Bodies £0.142m.
20

Page 21

d. Realignment of budget to reflect service delivery in respect of Waste, Grounds and Streets and Universal Free School Meals and
Nursery and Breakfast within Facilities. Net Effect £0.000m: Employees (£0.751m), Property £0.035m, Supplies and Services
£0.859m, Transport and Plant £0.063m, Payment to Contractors (£0.282m), Income £0.076m.
e. Transfer from reserves in respect of expenditure commitments and transfer to corporate items in respect of Local Action Fund. Net
Effect £0.569m: Property £0.096m, Supplies and Services £0.128m, Payment to Contractor £0.345m.
f. Transfer to Roads, Transportation and Fleet Services temporary budget in respect of storm damage. Net Effect (£0.035m): Transport
and Plant £0.365m, Payment to Contractors (£0.100m), Income (£0.300m). 
Transfer to Reserves (£0.768m):
i. Forrest Street Transfer Station (£0.150m)
ii. Air Condition for Refuse Collection Vehicles (£0.080m)
iii. IT Handheld Devices (£0.100m)
iv. Front Line First (£0.438m) 
21

Page 22

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
Planning and Regulatory Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7,759 7,371 388 Under 5.00% 5,873 1
Property Costs 39 23 16 Under 41.03% 12 
Supplies & Services 163 191 (28) Over (17.18%) 151 2
Transport & Plant 126 121 5 Under 3.97% 75 
Administration Costs 125 163 (38) Over (30.40%) 75 3
Payments to Other Bodies 233 223 10 Under 4.29% 98 
Payments to Contractors 757 843 (86) Over (11.36%) 644 4,a
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 46 36 10 Under 21.74% 2 
Total Controllable Exp. 9,248 8,971 277 Under 3.00% 6,930 
Total Controllable Inc. (4,013) (4,714) 701 Over (17.47%) (3,709) 5
Net Controllable Exp. 5,235 4,257 978 Under 18.68% 3,221 
Transfer to Reserves - 100 (100)   
Position after Transfer to
Reserves 5,235 4,357 878 Under 16.77% 
Variance Explanations 
1. The forecast underspend is due to staff vacancies and turnover.
2. The forecast overspend is mainly due to IT license costs within Planning, partially offset by reduced costs for IT Confirm system within
Environmental.
3. The forecast overspend is partly due to additional costs for local plan reporter and increased legal expenses.
4. The forecast overspend is mainly due to an increased contract costs for dog kennelling services, property clearance costs within
Environmental and specialist works within Planning, which will be offset by income.
5. The forecast over recovery is mainly due to increased income from Planning applications. 
Budget Virements  
a. Redetermination of General Revenue Grant in respect of single use vapes. Net Effect £0.012m: Payment to Contractors £0.012m. 
Transfer to Reserves (£0.100m):
v. Local Action Plan (£0.100m) 
22

Page 23

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7 7 0 - 0.00% 6 a
Property Costs 4,650 4,642 8 Under 0.17% 3,573 a
Supplies & Services 0 0 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 15 15 0 - 0.00% 15 a
Payments to Other Bodies 80 60 20 Under 25.00% 14 1
Payments to Contractors 15,383 15,383 0 - 0.00% 15,140 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 0 0 0 - 0.00% 0 
Total Controllable Exp. 20,135 20,107 28 Under (0.13%) 18,748 
Total Controllable Inc. (45) (45) 0 - 0.00% (43) a
Net Controllable Exp. 20,090 20,062 28 Under (0.13%) 18,705 
Variance Explanations 
1. The forecast underspend is due to the budget for the annual Fireworks Display at Strathclyde Park not being required this year. 
Budget Virements  
a. Realignment of budget to reflect service delivery. Net effect £0.000m: Employees £0.003m, Property £0.035m, Administration
£0.007m, Income (£0.045m). 
23

Page 24

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 8,919 8,599 320 Under 3.59% 6,875 1,a,b
Property Costs 299 686 (387) Over (129.4%) 300 2
Supplies & Services 178 173 5 Under 2.81% 89 a
Transport & Plant 353 349 4 Under 1.13% 75 
Administration Costs 113 89 24 Under 21.24% 40 
Payments to Other Bodies 10,187 10,640 (453) Over 0.11% 5,261 3,a
Payments to Contractors 120 120 0 - - 87 a
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 51 69 (18) Over (35.29%) 17 
Total Controllable Exp. 20,220 20,725 (505) Over (2.49%) 12,744 
Total Controllable Inc. (13,562) (13,531) (31) Under (0.23%) (6,816) a
Net Controllable Exp. 6,658 7,194 (536) Over (8.05%) 5,928 
Transfer to Reserves - 200 (200)   
Position after Transfer to
Reserves 6,658 7,394 (736) Over (11.05%) 
Variance Explanations 
1. The forecast underspend is due to staff vacancies and turnover.
2. The forecast overspend is mainly due to additional dilapidation works at Hamilton Towers.
3. The forecast overspend reflects commitments in respect of Employability activities. 
Budget Virements 
a. Realignment of budget to reflect service delivery within Support, Economic Development and Town Centre. Net effect £0.000m:
Employees (£0.436m), Supplies and Services £0.020m, Payment to Other Bodies £0.272m, Payment to Contractors £0.120m,
Income £0.024m
b Redetermination of General Revenue Grant in respect of Employability, No One Left Behind. Net effect £0.102m: Employees
£0.120m. 
Transfer to Reserves (£0.200m):
vi. Local Growth Fund Transition (£0.200m) 
24

Page 25

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 23 January 2026 (No.11) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 21,317 20,336 981 Under 4.60% 15,713 1,b
Property Costs 2,069 2,226 (157) Over (7.59%) 2,052 2,a,b
Supplies & Services 8,487 10,752 (2,265) Over (26.69%) 7,524 3,b
Transport & Plant 13,958 14,897 (939) Over (6.73%) 8,932 4,b
Administration Costs 426 527 (101) Over (23.71%) 410 5,b
Payments to Other Bodies 6,328 6,443 (115) Over (1.82%) 6,212 6,b
Payments to Contractors 3,904 8,205 (4,301) Over (110.2%) 3,412 7,a,b,c
Transfer Payments 625 625 0 - 0.00% 625 B
Financing Charges 49 53 (4) Over (8.16%) 4 
Total Controllable Exp. 57,163 64,064 (6,901) Over (12.07%) 44,884 
Total Controllable Inc. (37,412) (44,219) 6,807 Over 18.19% (31,613) 8,c,b
Net Controllable Exp. 19,751 19,845 (94)    Over 0.47% 13,271 
Transfer to Reserves - 50 (50)   
Position after Transfer to
Reserves 19,751 19,895 (144) Over (0.7%) 
Variance Explanations 
1. The forecast underspend is due to vacancies and staff turnover.
2. The forecast overspend is due to higher than budgeted running costs and repairs for depots.
3. The forecast overspend mainly relates to increased costs for annual subscriptions for computer licences as well as updates to the
Tranman software within Fleet. In addition, greater material costs within Roads Construction due to additional capital and carriageway
repair works, recovered via income.  
4. The forecast overspend is due to increased costs in relation to the Passenger Services Agreement within Roads and greater
expenditure on materials and tyres within Fleet. An overspend within fuel is offset by an over recovery of income.
5. The forecast overspend is due to higher than budgeted costs for medicals, member subscriptions and training across the service.
6. The forecast overspend is due to West of Scotland Local Authorities payments for the weather forecasting service for winter
maintenance.
7. The forecast overspend is mainly due to higher than budgeted costs for winter, additional costs for reactive maintenance of
carriageways, structures, lighting and for statutory bridge inspections and increased contractor costs for maintenance of traffic lights.
Increased sub-contractor costs are anticipated within Roads Construction to manage overall workload and complete specialist works.
8. The forecast over recovery is mainly within Roads and is due to permit income, rechargeable street lighting works and Inspection
Fees. Within Roads these are partially offset by lower than anticipated income from Parking and Vehicle Electrical power recharging.
There is a further over recovery anticipated within Roads Construction for increased capital and rechargeable works. The Fleet
forecast over recovery is in relation to income for fuel which offsets the overspend within Transport & Plant, as well as over recoveries
on vehicle maintenance, Road Fund Licences, casual hire management fee and employee recharges.                   
Budget Virements 
a. Transfer from reserves in respect of Fleet Sinking Fund. Net Effect £0.067m: Property £0.067m.  
b. Realignment of budget to reflect to reflect anticipated spend and income within Roads and Fleet. Net Effect £0.000m: Employees
(£0.302m), Property £0.044m, Supplies and Services (£0.013m), Transport and Plant £0.015m, Administration £0.038m, Payments to
Other Bodies (£0.002m), Payment to Contractors £0.132m, Transfer Payments £0.008m, Income £0.080m.
c. Establish a temporary budget to reflect grant for flood prevention at Coulter. Net Effect £0.000m: Payment to Contractors £0.005m,
Income (£0.005m). 
Transfer to Reserves (£0.050m):
vii. Fleet Sinking Fund contribution (£0.050m)
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April 2025 to 23 January 2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources capital programme of £55.160
million, and forecast expenditure of £53.410 million, be noted.
[1recs]
3. Background
3.1. This is the fourth capital monitoring report presented to the Community and Enterprise
Resources Committee for the financial year 2025/2026.  A final report will be provided
following financial year-end. 
3.2. The revised budget of £55.160 million for Community and Enterprise Resources is
based on the overall Capital Programme for 2025/2026 (June 2025).  There has been
no change to this budget since the last report to this Committee. 
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2025/2026 Budget 
As detailed in Section 3.2, the revised capital programme for Community and
Enterprise Resources for 2025/2026 is £55.160 million.   
5.2. The Walk Wheel Cycle Trust (formerly SUSTRANS) has confirmed that South
Lanarkshire will receive £0.909 million for improvements along the existing NCN75
Clyde walkway path, to update the traffic signal at St Stephens Avenue / East Kilbride
Road Crossing, Rutherglen and for resurfacing along the existing NCN 74 Abington to
Crawford Quietway.  Works are underway to progress these projects and maximise
4
27

Page 28

spend this financial year, however, given the timing of the award, this budget will be
added to the 2026/2027 programme with any spend achieved in 2025/2026 managed
from the funding available. 
5.3. 2025/2026 Forecast   
Appendix A shows a forecast for the financial year of £53.410 million, an anticipated
net underspend of £1.750 million. 
5.4. The anticipated underspend in 2025/2026 is due to 2 projects, East Kilbride Town
Centre (£0.800 million) where the demolition costs are lower than anticipated, and
Hamilton Junctions (£0.950 million) as works planned for Wellhall Road have been
reprogrammed to begin in spring 2026. 
5.5. For information, actual expenditure incurred to 23 January 2026 is £30.964 million. 
6. Leisure and Culture Transformation Fund Programme
6.1. The Transformation Fund has a total budget of £13.000 million with forecast spend of
£10 million expected in 2025/2026. 
6.2. Physical progress through the year is going well.  Projects complete to date include
Fitness Studio Modernisation and Gym Upgrades across the area (in John Wright
Sports Centre, Carluke Leisure Centre, Hamilton Water Palace and Lanark Lifestyles),
as well as library reprovisions at Hillhouse and Earnock, Greenhills, Blantyre, and
Forth. 
6.3. Other finished projects include the pitch replacement at Whitemoss Recreation Area,
the pool, changing and fabric upgrades at Coalburn Leisure Centre, the football
pavilion toilet upgrade and lift replacement at Hamilton Palace, and the internal
upgrades at the Murray Owen Centre. 
6.4. Work is continuing across a number of other projects including the conservatory roof
at Calderglen Country Park, the upgrades to the dryside changing and showers in
Blantyre Leisure Centre, the upgrade works at Lanark Memorial Hall, and the toilets
at Chatelherault Country Park. 
6.5. In addition, the Fitness Studio Modernisation and Gym Upgrade programme continues
with works commenced at Dollan Aqua Centre, Blackwood Community Wing and
South Lanarkshire Lifestyles Eastfield. 
7. 2025/2026 Investments
7.1. Funding has been allocated to Community and Enterprise Resources as part of the
2025/2026 Investment funding.  The Community and Enterprise budget for 2025/2026
includes £6.754 million of Investment funding as outlined overleaf:-  
28

Page 29

2025/2026 Investments 2025/2026
Budget
Profile
Forecast
Spend
Forecast
Variance
Actual
Spend 
£m £m £m £m
Roads and Infrastructure  4.000 4.000 0.000 4.000
Hamilton Town Centre 1.000 1.000 0.000 0.097
Outdoor Facilities 0.400 0.400 0.000 0.000
Overtoun Park Bandstand 0.150 0.150 0.000 0.049
Country Park Masterplans –
Feasibility
0.075 0.075 0.000 0.006
Skate Park/Bike Pump Track,
Calderglen
0.300 0.300 0.000 0.047
White Bridge and Boardwalk,
Chatelherault
0.075 0.075 0.000 0.001
Safe Routes 0.500 0.500 0.000 0.000
Local Action Fund (Play Parks) 0.254 0.254 0.000 0.000
Total 6.754 6.754 0.000 4.200 
7.2. A further £22.000 million of 2025/2026 investments allocated to the Resource is
profiled to spend in 2026/2027 and 2027/2028 (£10.650 million and £11.350 million
respectively). 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
9. Other Implications
9.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required.   
10.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
18 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent  
29

Page 30

Previous References
 Executive Committee, 25 June 2025
 Executive Committee, 5 November 2025
 Executive Committee, 3 December 2025 
List of Background Papers
 Financial ledger to 23 January 2026 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
30

Page 31

Appendix A 
South Lanarkshire Council Capital Expenditure 2025-2026
Community and Enterprise Resources Programme
For Period 1 April 2025 – 23 January 2026 
Community & Enterprise Base
Budget 
£000
Budget
Adjustments
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000 
Facilities, Waste and Grounds  3,124  478  (941)  2,661  2,661  -  589 
Enterprise and Sustainable
Development 
24,062  8,630  (3,404)  29,288  27,538  1,750  16,849 
Roads, Transport and Fleet  20,489  2,722  -  23,211  23,211  -  13,526 
TOTAL  47,675  11,830  (4,345)  55,160  53,410  1,750  30,964   
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – 1 October to 31 December 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 October to 31 December 2025 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for 1 October to 31 December 2025
relating to Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 staffing watch as at 13 December 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Community and
Enterprise Resources provides information on the position for 1 October to 31
December 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of December 2025 for
Community and Enterprise Resources. 
The Resource absence figure for December 2025 was 8.4%, this figure has
increased by 0.7% when compared to the last month and is 0.9% higher than the
Council-wide figure.  When compared to December 2024, the Resource absence
figure has increased by 1.0%. 
Based on the absence figures at December 2025 and annual trends, the projected
annual average absence for the Resource for 2025/2026 is 7.1%, compared to a
Council-wide average figure of 6.1%.
5
33

Page 34

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 351 referrals were made this period. 
This is an increase of 50 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2)
There were 42 accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 27 disciplinary hearings were held within the Resource, this is an
increase of 6 when compared to the same period last year.  One appeal was heard
by the Resource, this figure has increased by 1 when compared to the same period
last year.  Two grievances were raised within the Resource, this figure has increased
by 1 when compared to the same period last year.  Three Dignity at Work complaints
were raised within the Resource, this figure has increased by 1 when compared to
the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 26 leavers this period eligible for an exit interview.  The number
of leavers has decreased by 8, when compared with the same period last year. 
During the period 3 exit interviews were conducted, this figure has decreased by 5
when compared to the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been an increase of 5 employees in post from 13 September 2025 to 13
December 2025.   
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for risk in terms of the information contained within this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report.
34

Page 35

Jackie Taylor
Executive Director (Finance and Corporate Resources) 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
3 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 16 December 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  4647  (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
35

Page 36

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4
July 2.3 3.8 3.6 July 4.6 4.5 5.9 July 4.3 4.4 5.5 July 3.8 4.1 4.3
August 3.0 3.4 2.5 August 5.2 6.2 6.7 August 4.9 5.7 6.1 August 4.1 4.7 4.7
September 2.5 3.8 3.5 September 7.1 7.5 8.2 September 6.4 6.9 7.4 September 5.3 6.1 6.1
October 2.0 4.2 3.3 October 7.0 7.2 8.2 October 6.3 6.7 7.4 October 5.1 6.0 6.2
November 2.6 3.6 3.3 November 8.1 8.3 8.6 November 7.3 7.6 7.7 November 6.2 6.9 7.0
December 3.0 3.8 4.6 December 7.5 8.1 9.1 December 6.8 7.4 8.4 December 6.6 7.0 7.5
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.5 Annual Average 6.8 7.2 7.8 Annual Average 6.2 6.6 7.1 Annual Average 5.4 5.9 6.1
Average Apr-Dec 3.0 3.7 3.4 Average Apr-Dec 6.4 6.8 7.6 Average Apr-Dec 6.0 6.3 6.9 Average Apr-Dec 5.1 5.6 5.8
586 2828 3414 15695
Manual Workers Resource Total
No of Employees at 31 December 2025 No of Employees at 31 December 2025 No of Employees at 31 December 2025 No of Employees at 31 December 2025
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council Wide
36

Page 37

Oct - Dec Oct - Dec
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 105 109
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 301 351
Oct - Dec Oct - Dec
2024 2025
Over 7 day absences 5 3
Minor 17 17
Near Miss *** 1 5
Violent Incident:  Physical**** 11 14
Violent Incident:  Verbal***** 2 3
Total Accidents/Incidents 36 42
Oct - Dec Oct - Dec
2024 2025
Total Number of Hearings 21 27
Total Number of Appeals 0 1
Appeals Pending 0 1
Time Taken to Convene Hearing - Oct to Dec 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
9 3 15
Oct - Dec Oct - Dec
2024 2025
Number of Grievances 1 2
Still in Progress 1 2
Oct - Dec Oct - Dec
2024 2025
Number of Incidents 2 3
Still in Process 2 3
RECORD OF DIGNITY AT WORK
108 128
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
0 3
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
88 111
37

Page 38

Oct - Dec Oct - Dec
2024 2025
Career Advancement 4 6
Child Caring / Caring Responsibilities 0 4
Disatisfaction with terms and conditions 0 1
Moving outwith area 0 2
Personal Reasons 2 2
Travelling difficulties 1 0
Other 27 11
Total Number of Leavers Eligible for Exit Interview 34 26
Number of Exit Interviews conducted 8 3
Percentage of interviews conducted 24% 12%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
38

Page 39

As at 13 December 2025
Total Number of Employees
F/T P/T F/T P/T
1237 343 244 1539
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1672.59 414.51 270.11 48.63 17.60 0.00 2.00 0.00 2430.44
As at 13 September 2025
Total Number of Employees
F/T P/T F/T P/T
1243 338 242 1535
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1680.29 411.70 263.72 48.94 17.60 0.00 2.00 0.00 2429.25
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3358
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3363
MALE FEMALE TOTAL
39

Page 40

40

Page 41

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Council Budget 2026/2027 - Infrastructure and Service
Area Investment 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide further detail in relation to the key investment activity agreed as part of
the 2026/27 Budget that relates to Community and Enterprise Resources (CER);
outlining the main areas of recurring and one-off investment, highlighting how
these proposals aim to improve services, infrastructure, and community
outcomes across South Lanarkshire 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted; and 
(2) that the distribution of the £4.000m Outdoor Investment monies as set out in
paragraphs 4.18 to 4.20 be approved. 
3. Background
3.1. The 2026/27 Budget, agreed at the full South Lanarkshire Council meeting on 26
February 2026, represents a significant level of investment for our communities, with
particularly strong support for the wide range of service and infrastructure areas within
Community and Enterprise Resources. 
3.2. The investment reflects a clear recognition of the vital role that Community and
Enterprise Resources plays in supporting residents, businesses, and communities,
ensuring these services are well resourced and equipped to deliver meaningful and
lasting benefits across South Lanarkshire. 
4. Investment Proposals
4.1.  Services within Community and Enterprise Resources will benefit significantly from the
proposals through a combination of recurring and one-off investment that will allow for
operational enhancements, sustainable environmental and infrastructure
improvements, and investment in economic development.   
4.2. Appendix 1 summarises the investment areas and the remaining part of Section 4
provides more detail. 
6
41

Page 42

Recurring Investment
4.3.  Enhanced Grounds Maintenance – Increased investment of £1.700m provides an
uplift in the Council’s capacity to manage and improve our streets and community
green spaces.  Additional frontline staff will allow for more regular maintenance cycles,
quicker response times, and greater attention to detail across parks, verges, and
shared open spaces including:- 
 increased arboriculture team
 town centre/high footfall teams
 introduction of apprenticeships 
4.4. This will help deliver cleaner, safer, and more welcoming environments, improving the
visual appearance of neighbourhoods and contributing to local pride.  The enhanced
service will also support biodiversity, better manage seasonal growth, and help ensure
that green spaces are accessible and enjoyable for all residents throughout the year. 
Plans are now progressing for the recruitment of additional staff. 
4.5. Second Hedge Cut Reinstated – The reinstatement of an annual second hedge cut,
funded through an investment of £0.144m per year, is expected to provide noticeable
improvements to the look and feel of public areas.  A second cut which will be
undertaken will enhance visibility along footways and roads, supporting road safety
and pedestrian confidence.  It also prevents hedges from becoming overgrown,
reducing obstructions, and ensuring that paths remain accessible.  Hedge cutting is
generally undertaken during bird nesting season and operatives are expected to check
for nesting birds before they undertake any work on hedges or trees.  If a nest is found,
then work would not start, or it would cease at that location until the birds had left later
in the season.  The re-introduction of the second hedge cut would mean the first cut
would be undertaken over June and July, and the second cut over September and
October.  This additional maintenance cycle improves overall appearance and helps
keep communities tidy, particularly during peak growing seasons. 
4.6. Expanded Business Grants – The expansion of business grants by £0.400m from
£0.100m to £0.500m will provide a boost to the local economy.  At present grant
awards are up to £5,000, increasing this to £20,000 will support a wider range of
businesses to invest in growth, modernisation, and sustainability measures.  This may
include upgrading premises, adopting digital technologies, purchase of equipment or
supporting expansion into new markets.  Increased access to funding strengthens the
resilience of local enterprises, helps attract and retain jobs and contributes to the long-
term economic vitality of South Lanarkshire.  It will also further connect businesses
with Business Gateway.   
4.7. Free Swims for Under 16s – Working in partnership with South Lanarkshire Leisure
and Culture, the investment of £0.250m will provide free swimming for all under 16s. 
This initiative removes financial barriers to participation and encourages children and
young people to engage in regular physical activity.  Increasing access to swimming
supports physical wellbeing, builds confidence in water, and promotes healthy habits
from an early age.  It also aligns with wider ambitions to improve health, reduce
inequalities in access to sport and create more inclusive leisure opportunities for
families across the area.   
One-Off Investment
4.8. Environment and Infrastructure Improvements – Investment of £12.000m in roads
and environmental infrastructure, complementing existing capital funding streams will
provide a dedicated funding package for key asset groups.   
42

Page 43

Investment areas include street lighting, traffic signal and pedestrian crossings,
bridges, open spaces, signage, underpasses, drainage, and flood prone areas. 
Specific projects and programmes are being developed and prioritised in line with their
known condition and relevant Asset Management Plans priorities and are expected to
be delivered over the next 3 years. 
4.9. This investment is expected to ease pressure on other investment areas (e.g.
carriageways), in turn, allowing greater investment in these areas also.  The
investment will strengthen local infrastructure, improve safety, and create more
pleasant and resilient environments. 
4.10. Collectively, this investment will result in safer, better maintained, and more
sustainable environments for residents, businesses, and visitors. 
4.11. Support for Local Business Growth – Support for local business growth is
strengthened through a total investment of £3.500m.  £1.000m is identified for a new
business grant programme which will target the retrofit of private sector industrial
properties enabling companies to modernise properties and invest in decarbonisation
and energy efficiency with grant awards of up to £50,000.  This investment will help
businesses remain competitive while contributing to wider net zero ambitions. 
Guidance for applicants is currently being prepared, and the business grant application
portal is being revised and will be launched in spring 2026.   
4.12. Investment in improving commercial property stock both Council owned and privately
held supports the development of modern, fit for purpose business environments. 
£2.000m funding to allow for £11m of investment for the development of new
commercial spaces will help meet growing demand locally, allowing businesses to
start up and expand within South Lanarkshire rather than relocating elsewhere.  These
combined measures stimulate economic growth, attract new investment, create
employment opportunities, and help sustain a thriving local business base.  A
feasibility study will be undertaken to scope out development opportunities for the
Council’s Canderside site in Larkhall as well as other sites across the area.  £0.500m
is also identified for improvements to the Council’s business centres which will also
consider the delivery model for providing this service.   
4.13. Country Parks Development – Investment of £7.300m in our two main country parks
will progress key elements of existing masterplans and significantly improve the visitor
experience across these much valued assets.  Planned projects include the £1.200m
expansion of the playpark at Chatelherault, delivering new facilities that will cater to a
wider age range and increase visitor capacity. 
4.14. At Calderglen, enhanced access infrastructure, upgraded active travel routes,
improved wayfinding, improved footpath infrastructure and new lighting at a total cost
of £5.600m will make the park more accessible, more secure, and easier to navigate. 
These developments will support local tourism and ensure that the parks continue to
offer high quality, family friendly recreation. 
4.15. Strengthening the infrastructure within country parks will also assist in attracting new
business and events, protect natural environments while encouraging sustainable
access for future generations. 
4.16.  A further £0.500m is identified to support the design development of these projects
which will take place during 2026/27 with works programmed to commence from
2027/28.   
43

Page 44

4.17. Outdoor and Recreational Enhancements – Investment of £4.000m will allow
upgrades to outdoor and recreational spaces to ensure that more people can enjoy
accessible, high-quality facilities within their own communities. 
4.18. Accelerated refurbishment of Multi Use Games Areas (MUGAs), including those within
school estates, will improve opportunities for sport and play while reducing
maintenance issues associated with ageing surfaces.  It is proposed to allocate
£1.000m towards the upgrade of these facilities with the first of these enhancements
being undertaken at Hareleeshill Primary School, Lanark Primary School, Robert
Smillie Primary School and St Vincent’s Primary School.   
4.19. Our communities also have a number of other assets which would welcome
investment such as former tennis courts, 5 aside pitches, features within parks as well
as general enhancements such as pathway improvements, new lighting, to make
recreational spaces safer and more inclusive, particularly for children, older adults,
and those with mobility challenges.  An allocation of £2.000m is proposed for this
activity with initial projects identified as Bothwell Road Park Bandstand and Overtoun
Park Bandstand.   
4.20. The intention to bring unused or underutilised spaces back into community use has
the potential to revitalise neighbourhoods, unlock local volunteering and community
involvement.  It is proposed that £1.000m is allocated to support community groups
upgrade outdoor spaces and pitches which will also unlock external funding
opportunities and support Community Asset Transfers potentially including community
projects at Eddlewood Park in Hamilton and Raploch in Larkhall. 
4.21. Culture Strategy - The one-off investment of £0.800m in a cultural strategy represents
a valuable opportunity to strengthen the cultural identity of South Lanarkshire’s towns
and communities.  Delivered in partnership with South Lanarkshire Leisure and
Culture, this funding will support locally driven cultural activities, events and initiatives
that celebrate heritage, highlight creativity, and widen access to arts and culture.  It
will also help develop a place-based approach that recognises the important role of
libraries, museums, and community organisations in shaping local identity and
participation. 
5.  Summary
5.1. Overall, this new investment programme brings substantial benefits for communities,
businesses, and the wider South Lanarkshire environment. 
5.2. The investment programme delivers major improvements to core infrastructure and
public spaces.  Upgrades to roads, street lighting, crossings, bridges and flood prone
areas will make the network safer, more resilient and more reliable, while
enhancements to open spaces and signage will create cleaner, more attractive
neighbourhoods.  These foundations will also support active travel, reduce long term
maintenance needs and contribute to more welcoming environments for residents. 
5.3. Significant investment in outdoor, recreational and country park facilities will
strengthen health, wellbeing and community participation.  Upgrades to MUGAs,
paths, lighting and accessibility will ensure more people can enjoy high quality facilities
locally, revitalising unused areas and promoting greater social inclusion. 
Improvements to country parks including masterplan projects, better access and
enhanced amenities will boost visitor numbers, support tourism and reinforce these
parks as long term environmental and community assets. 
44

Page 45

5.4. The programme also supports economic growth, cultural development and sustained
community services.  Expanded business grants and upgraded commercial spaces
will help local firms modernise, create jobs and remain competitive, while a one-off
cultural investment will strengthen creative opportunities and local identity.  Recurring
commitments such as improved grounds maintenance, reinstated hedge cutting, free
swims for under 16s and wider business support ensure ongoing, long-term benefits. 
5.5. Collectively, these investments form a comprehensive approach to building cleaner,
safer, more inclusive and economically resilient communities across South
Lanarkshire.  As plans are developed across the range of investments outlined here,
updates will be provided to Committee either through the regular reporting or individual
reports as appropriate. 
6. Employee Implications
6.1. As these proposals progress into more detailed and prioritised work programmes, it 
should be recognised that key service areas will need to strengthen core capacity to
support delivery.  This includes enhancing planning, programme management,
development, operational and delivery resources to ensure projects are implemented
effectively.  This is in addition to additional frontline resource to deliver enhanced
services on the ground. 
6.2. Given that many of the larger investment areas will be delivered over multiple years,
sustained coordination and increased capability will be essential.  By reinforcing these
core service areas, we will be well positioned to deliver the full benefits of this
investment and lock in and support long term improvements across South Lanarkshire. 
7. Financial Implications
7.1. This new investment programme brings substantial benefits for communities,
businesses, and the wider South Lanarkshire environment.  It is important to note that
for the larger investment areas particularly those relating to environment and
infrastructure, country parks, and outdoor improvements are expected to be delivered
across multiple years, reflecting the scale and complexity of the works involved and
ensuring that projects are phased appropriately for maximum long-term benefit.   
8. Climate Change, Sustainability and Environmental Implications
8.1. The investment programme provides clear and positive environmental benefits. 
Improvements to roads, lighting, underpasses, and flood prone areas will strengthen
local resilience to the impacts of climate change, reducing surface-water risk and
improving the safety and reliability of key infrastructure.  Enhancements to open
spaces and signage also support more attractive, well-maintained, and sustainable
environments. 
8.2. Upgrades to outdoor and recreational areas, including paths, lighting and MUGA
replacements, will encourage more active travel and outdoor activity.  By improving
accessibility and bringing unused spaces back into community use, these investments
promote healthier, low carbon lifestyles while maximising the value of existing assets. 
8.3. Investment in country parks further supports sustainable land management by
improving active travel links, enhancing visitor facilities, and encouraging increased
use of natural spaces.  These improvements help reduce reliance on car based
recreation and strengthen the long-term environmental stewardship of these valued
green assets.  
45

Page 46

8.4. Support for local business growth also contributes to sustainability aims, with higher
value grants offering opportunities for businesses to modernise, improve energy
efficiency and invest in lower carbon commercial spaces.  Collectively, these
measures help reduce emissions, increase resilience, and deliver long term
environmental benefits for communities across South Lanarkshire. 
9. Other Implications
9.1. Investment in infrastructure, environmental improvements and commercial
developments may require planning permissions, environmental assessments,
procurement exercises and compliance with building and safety standards.  This may
affect timelines and resource planning. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore, no integrated impact
assessment is required.  However, an Integrated Impact Assessment (IIA) will be
undertaken for the overall investment areas set out in this paper. 
10.2. This paper presents a broad range of additional investment across Community and
Enterprise Resources and South Lanarkshire Leisure and Culture.  Consultation will
be undertaken as appropriate depending on the requirements of the investment.  For
example, development of a Culture Strategy will require collaboration and consultation
with the public, community groups and service users. 
Kevin Carr 
Executive Director (Community and Enterprise Resources) 
26 February 2026 
Link(s) to Council Values/Priorities/Outcomes 
  Focused on people and their needs 
  Working with and respecting others 
  Accountable, effective, efficient, and transparent 
  Ambitious, self-aware, and improving 
  Fair, open and sustainable 
  We will work to put people first and reduce inequality 
  We will work towards a sustainable future in sustainable places 
  We will work to recover, progress and improve 
  Good quality, suitable and sustainable places to live 
  Caring, connected, sustainable communities 
  Thriving business, fair jobs and vibrant town centres
  People live the healthiest lives possible 
Previous References 
 None 
List of Background Papers 
 None 
46

Page 47

Contact for Further Information
If you would like any further information, please contact: - 
Colin Park, Head of Roads, Transportation and Fleet Services
Ext: 4484 (Tel:  01698 454484)
E-mail:  Colin.Park@southlanarkshire.gov.uk  
47

Page 48

Appendix 1 
Recurring 
£m
Spend on our Grounds Service 1.700
Reinstating a second hedge cut 0.144
Expand Business grants 0.400
Free swim for under 16s  0.250 
2.494 
One-Off Investment 
Investment in environment and
infrastructure  12.000
Supporting and developing Local Business   3.500
Country Parks  7.300
Outdoor Investment  4.000
Culture Strategy 0.800 
27.600   
48

Page 49

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to approve grant applications from the Renewable
Energy Fund (REF) for:-
[purpose]
 Carnwath Golf Club
 Community Volunteers Enabling You
 Crawfordjohn Heritage Venture Trust
 Douglasdale REAL Group
 Lanark Community Development Trust
 [1purp]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a grant be awarded to Carnwath Golf Club of up to £53,862.89 from the
Renewable Energy Fund to install a swing room within the club premises;
(2) that a grant be awarded to Community Volunteers Enabling You of up to
£148,607.65 from the Renewable Energy Fund to support project revenue
costs;
(3) that a grant be awarded to Crawfordjohn Heritage Venture Trust of up to
£57,032 from the Renewable Energy Fund to renovate and restore a historic
pipe organ;
(4) that a grant be awarded to Douglasdale REAL Group of up to £189,677.50
from the Renewable Energy Fund to employ a Community Woodland
Development Officer and complete architectural services through RIBA Stage
2; and
(5) that a grant be awarded to the Lanark Community Development Trust of up to
£30,000 from the Renewable Energy Fund to employ an Educational Gardner. 
1recs]
3. Background
3.1. Since 2004, the Council has collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service.  The Service is
responsible for securing the contributions from windfarm developers, advising
potential applicants, assessing applications and monitoring projects to ensure that
the community benefits associated with each project are delivered.  Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities.
7
49

Page 50

3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority.  All grants awarded are reported annually to the Community and
Enterprise Resources Committee.   
3.3. Several changes were made to the REF criteria at the Community and Enterprise
Resources Committee of 6 February 2024 including supporting revenue funding,
increases to intervention levels and aiming to deliver larger more strategically
impactful projects. 
4. Grant Recommendation
4.1. Application Number 1468 
Carnwath Golf Club – project value £71,817.89 
Proposed Grant award £53,862.89 intervention rate of 75% 
The proposed grant of £53,862.89 will be funded from Blacklaw Windfarm which
contributes into the Renewable Energy Fund 
4.2. Carnwath Golf Club (CGC) is a community‑focused members’ golf club with its
purpose being:- 
To provide accessible sporting, recreational and social opportunities for
people of all ages and abilities.  The main activities include maintaining an
18‑hole golf course, offering coaching and practice facilities, organising
competitions and events, and providing a welcoming environment for local
residents, visitors and families. 
4.3. CGC has a 12-member management committee, three regular volunteers, 550
members, 3 part-time staff and 6 full-time staff.  The club plays an active role in
promoting physical activity, wellbeing and community participation within the local
area.  In addition, they have a bar lounge and dining area (operated by an
independent caterer) for members, visitors, and social members.  They also have a
Club Professional operating his own business on the premises within the Pro Shop,
who will operate the ‘Swing Room’ on behalf of the Club.   
4.4. The grant will allow CGC to construct a new purpose‑built facility to enhance the
sustainability, and community impact of Carnwath Golf Club.  It will deliver a new
indoor ‘Swing Room’ to provide year‑round coaching, practice, and development
opportunities for members, juniors, beginners, and wider community groups.  These
improvements will strengthen participation, improve the member and visitor
experience, and secure the long‑term resilience of the club as a valued community
asset. 
4.5. The project requires capital funding for the construction of the new purpose‑built
facility to support club operations and improve service provision for members and
visitors.  The new building will provide secure, modern accommodation for essential
club functions and replace outdated infrastructure that no longer meets operational
needs.  The project will be delivered by a professional contractor and completed
within an estimated eight‑week period, ensuring long‑term sustainability and
improved efficiency for the club.  Planning permission has been approved for this
project. 
4.6. The project links with REF priorities supporting Stronger Communities, Prosperous
Communities and Healthy Active Communities. 
50

Page 51

4.7. The application has been assessed and scored an average of 26.5 out of 53
supporting a grant award of up to £53,862.89 totalling 75% of eligible costs. 
4.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:-  
Funder Stage Value
Carnwath Golf Club Funds Confirmed £17,955.00
South Lanarkshire Council (SLC)
Renewable Energy Fund Grant (75%)
Blacklaw. 
For approval £53,862.89
Total project value   £71,817.89  
4.9. The project is scheduled to commence in April 2026 and be complete by July 2026. 
Officers will work with the applicant to monitor progress and any impact on the
timescales. 
5. Grant Recommendation
5.1. Application Number 1470 
Community Volunteers Enabling You – project value £209,857.65 
Proposed Grant award £148,607.65 intervention rate of 71% 
The proposed grant of £148,607.65 will be funded from Andershaw, Bank End Rig
and Muirhall Stallashaw Windfarms which contribute to the REF  
5.2. Community Volunteers Enabling You (COVEY) is a charity with its purpose being:- 
To support children, young people and families facing multiple disadvantages
(including social isolation, trauma, poverty, and additional support needs) through
one-to-one and group befriending and mentoring.  Through our services, young
people and families become more resilient, safe and better equipped to reach their
full potential. 
5.3. COVEY management committee has 8 members, 55 regular volunteers, 18 full-time
staff and 12 part-time staff. 
5.4. The grant will allow COVEY to create a programme to cover as much of rural South
Lanarkshire as possible, to make sure that every child facing disadvantage can
access the support they need to reach their full potential regardless of where they
live. 
5.5. This funding support will deliver group activity for up to 12 young people, 1:1 support
for up to 6 young people, indirect support for up to 25 family members, and
volunteering opportunities for 5-8 volunteers, per year.  Three years of funding is
requested to ensure the project is consistent, sustainable, and can demonstrate
impact. 
5.6. The project requires a revenue support contribution to cover staff costs, activities,
travel, venue hire and training activities for a 3-year period. 
5.7. The project links in REF priorities supporting Stronger Communities, Prosperous
Communities and Healthy Active Communities.   
5.8. The application has been assessed and scored an average of 35 out of 53
supporting a grant award of up to £148,607.65 totalling 71% of eligible costs. 
51

Page 52

5.9. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:  
Funder Stage Value
Loaningdale Trust To be confirmed £15,000
Nedara Energy Glenkerie Wind Farm
Community Fund
Confirmed £1,250
SSE Clyde Extension Community Fund Confirmed £45,000
SLC Renewable Energy Fund Grant
(71%) Andershaw, Bank End Rig,
Muirhall Stallashaw 
For approval £148,607.65
Total project value   £209,857.65 
5.10. The project is scheduled to commence in April 2026 and be complete by May 2029.
Officers will work with the applicant to monitor progress and any impact on the
timescales and allow officers to confirm Loaningdale Trust funds have been secured. 
6. Grant Recommendation
6.1. Application Number 1465 
Crawfordjohn Heritage Venture Trust – project value £76,032   
Proposed Grant award £57,032 intervention rate of 75% 
The proposed grant of £57,032 will be funded from Gallawhistle which contributed to
the REF 
6.2. Crawfordjohn Heritage Venture Trust (CHVT) is a charity with its purpose being:- 
CHVT is a charity established in 1988 to house a collection of historic rural life from
Crawfordjohn and the surrounding areas housed within the Old Church,
Crawfordjohn. 
6.3. CHVT has an 8-member management committee with 75 members and 6 regular
volunteers. 
6.4. The grant will allow CHVT to complete the renovation and restoration of the historic
pipe organ situated within the museum.  The 2 manual pedal organ was built by the
highly acclaimed Henry Hilsdon and was installed in the Church in 1912. 
6.5. The project will be managed by Organ Restoration Ltd Glasgow who submitted a full
report on the state of the organ and the proposed restoration process.  Once
restored, the aim through publicity will be to increase visitor numbers, awareness of
local history and promote local events.   
6.6. The project has been established and supported by visitors and the local community
to enhance the visitor experience for the museum and the area.   
6.7. The application has been assessed and scored an average of 27 out of 53
supporting a grant award of up to £57,032 totalling 75% of eligible costs. 
6.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:-  
52

Page 53

Funder Stage Value
Clyde Wind Farm Fund Confirmed £19,000
SLC Renewable Energy Fund Grant
(75%) Gallawhistle
For approval £57,032
Total project value   £76,032  
6.9. The project is scheduled to commence in April 2026 and be complete by April 2027.
Officers will work with the applicant to monitor progress and any impact on the
timescales. 
7. Grant Recommendation
7.1. Application Number 1462 
Douglasdale REAL Group – project value £252,903.27 
Proposed grant award £189,677.50 intervention rate of 75% 
The proposed REF grant of £189,677.50 will be funded from Gallawhistle windfarm
which contributes into the Renewable Energy Fund 
7.2. Douglasdale REAL Group (DRG) is a Charity with its purpose being:- 
The advancement of heritage and culture through the preservation of local
rural areas, increasing awareness of and interest in local history, talent and
traditions through education, entertainment and partnership working. 
7.3. DRG has a 7-member management committee, 40 regular volunteers, 200 members
and 2 part-time staff. 
7.4. The grant will allow DRG to employ a Community Woodland Development Officer for
a 3-year period and to appoint architects O’Donnell Brown to develop proposals as
an integral part of the Douglas Valley Outdoor Recreation and Adventure Tourism
proposals (please see separate committee report). 
7.5. The project requires revenue funding to employ a Community Woodland
Development Officer for a 3-year period and capital cost to secure architectural
services to:- 
 complete a RIBA Stage 2 Costed Feasibility Study for the conversion of 2A Main
Street Douglas for use as an office space and shop for Douglasdale Real Group
 complete a Costed Feasibility Study for Phase 1 of the Douglasdale Community
Woodland Project to include incoming services to the site, new community
agricultural hub, improved vehicle parking facilities, temporary accommodation to
provide welfare and meeting spaces, and 3 camping pods
 develop a RIBA Stage 2 Costed Feasibility Study of the Douglasdale Community
Woodland Project, which is to include the Douglasdale main hub building and
associated infrastructure and landscape works, a viewing tower, and a second
tranche of camping pods 
7.6. The project establishes Douglasdale Community Woodland as the key hub in the
Douglas Valley Outdoor Recreation and Adventure Tourism proposals, procured by
SLC on behalf of the community-led Douglas Valley Advisory Group.  It has been
developed in response to community action plans, community consultation events,
public meetings, focus groups, surveys and the Douglasdale Community Woodland
Business Plan, to gather input and feedback from the Douglas Valley area residents. 
The project has been supported and developed in conjunction with SLC staff, DRG
have a track record for supporting in the delivery of large-scale infrastructure
projects.
53

Page 54

7.7. The application has been assessed and scored an average of 36 out of 53
supporting a grant award of up to £189,677.50 totalling 75% of eligible costs. 
7.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:- 
Funder Stage Value
Clyde Wind Farm Fund To be confirmed £63,225.77
SLC Renewable Energy Fund Grant
(75%) Gallawhistle 
For approval £189,677.50
Total project value   £252,903.27 
7.9. The activity is scheduled to commence in April 2026 and be complete by May 2029.
Officers will work with the applicant to monitor and support project progress. 
8. Grant Recommendation
8.1. Application Number 1453 
Lanark Community Development Trust – project value £37,560 
Proposed Grant award £30,000 intervention rate of 44% 
The proposed grant of £30,000 will be funded from Blacklaw Windfarm which
contributes into the Renewable Energy Fund 
8.2. Lanark Community Development Trust (LCDT) is a Charity with its purpose being:- 
Lanark Community Development Trust (LCDT) is a forward-thinking
organisation that works hard for the benefit of the Lanark community.  They
were founded in 2009 and have been successful in achieving funding and
successfully delivering a wide range of both small and large-scale projects
including the development of the Castlebank Horticultural and Educational
Centre. 
8.3. LCDT has a 13-member management committee, 23 regular volunteers, 2 full-time
staff and 42 members. 
8.4. The grant will allow LCDT to employ an Educational Gardener from March 2026
through to March 2027 to organise events, manage volunteers, and continually
improve and maintain Castlebank Park, creating a vibrant space for learning and
wellbeing.  Beyond park maintenance, the gardener will support local residents by
advising on garden planning and management, fostering skills and confidence in
sustainable gardening. 
8.5. The project requires revenue funding to employ the Educational Gardener.  This role
strengthens community engagement, environmental education, and social
connection, to preserve and grow.  The gardener will also educate new gardeners on
how to manage an allotment, allowing people to have a space at the Horticulture
Centre and teach them how to grow their own food.  Also, Horticulture Centre
management and coordinating events will be part of the Educational Gardener’s
responsibilities. 
8.6. The project has been established in response to community consultation events,
including public meetings, focus groups, and surveys, to gather input and feedback
from residents.  These consultations have consistently shown strong support for
LCDT initiatives and park development. 
54

Page 55

8.7. The application has been assessed and scored an average of 24 out of 53
supporting a grant award of up to £30,000 totalling 44% of eligible costs. 
8.8. Renewable Energy Fund award set out below:-  
Funder Stage Value
In-kind Volunteer Time  Confirmed £33,600
LCDT one day a week salary
contribution
Confirmed £3,960
SLC Renewable Energy Fund Grant
(44%) Blacklaw
For approval £30,000
Total project value   £67,560 
8.9. The officer post is scheduled to commence in March 2026 for a period of a year. 
Officers will work with the applicant to monitor project progress. 
9. Employee Implications
9.1. There are no employee implications arising from this report. 
10. Financial Implications
10.1. The awards will come from Blacklaw, Andershaw, Bank End Rig, Muirhall Stallashaw
and Gallawhistle Windfarms which contribute to the Renewable Energy Fund.  The
Funds have sufficient resources to meet the proposed grant awards commitment
detailed in this report. 
10.2. REF funding awards are subject to all other funding being secured.   
11. Climate Change, Sustainability and Environmental Implications
11.1. The projects all contribute to sustainable communities for example the Lanark
Community Development Trust gardener will directly contribute to environmental
training and understanding of the natural environment.  The development of designs
for the Douglas Valley will support community woodlands sustainability and have
environmental and net zero principles within the design process. 
12. Other Implications
12.1. The risks associated with the project are focused on the potential for cost overruns,
delays to the projects or match funding not being secured.  Work will continue with
the applicants to ensure match funding is secured and that projects are delivered
broadly on time and within budget. 
13. Equality Impact Assessment and Consultation Requirements
13.1. This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
13.2. Community consultation is a requirement for all REF grants.  Consultation can be
referenced through community action plans, independent consultation and social
media platforms.   
Kevin Carr 
Executive Director (Community and Enterprise Resources) 
16 February 2026 
55

Page 56

Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resources Committee - 6 February 2024 - Renewable
Energy Fund - Strengthening Links to Rural Priorities 
List of Background Papers
 Completed REF Appraisal Scoring Sheet for application number 1468
 Completed REF Grant Application Form for application number 1468
 Completed REF Appraisal Scoring Sheet for application number 1470
 Completed REF Grant Application Form for application number 1470
 Completed REF Appraisal Scoring Sheet for application number 1465
 Completed REF Grant Application Form for application number 1465
 Completed REF Appraisal Scoring Sheet for application number 1462
 Completed REF Grant Application Form for application number 1462
 Completed REF Appraisal Scoring Sheet for application number 1453
 Completed REF Grant Application Form for application number 1453 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Colin McFarlane, Project Development Officer
Enterprise and Sustainable Development Services
E-mail: -  colin.mcfarlane@southlanarkshire.gov.uk 
56

Page 57

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Local Transport Strategy 2026 to 2036 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 seek approval of the Local Transport Strategy 2026 to 2036 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report, be noted;
(2) that the Local Transport Strategy 2026 to 2036 be approved; and
(3) that approval be granted to the Executive Director (Community and Enterprise
Resources) to make any minor amendments to the Strategy arising from the
final publication process. 
3. Background
3.1. South Lanarkshire faces a range of transportation challenges shaped by its mix of
rural communities, growing towns, and strategic transport corridors.  Pressures on
road and rail networks, public transport accessibility in some areas, and the need to
support sustainable travel choices all contribute to a complex mobility landscape.  As
communities evolve and travel demands change, ensuring that transport systems
remain reliable, safe, and efficient is increasingly important. 
3.2. To address these issues, South Lanarkshire requires a continuing and
well-developed integrated transport strategy that supports all modes of travel.  This
includes not only roads and public transport, but also active travel, digital mobility
solutions, and freight movements.  A coordinated approach helps ensure that
investment is targeted, infrastructure is future-proofed, and services meet the needs
of residents, businesses, and visitors alike. 
3.3. An integrated strategy plays a vital role in creating successful, vibrant, and resilient
communities.  By aligning transport planning with economic growth, environmental
stewardship, and social inclusion, South Lanarkshire can strengthen connectivity and
improve quality of life.  Bringing all modes together in a framework enables places to
thrive, supports local economies, and ensures that the region is well prepared for
future challenges.
8
57

Page 58

3.4.  Our current Local Transport Strategy (LTS) was published in 2013 and presented a
10-year vision for transport in the local authority area.  With the strategy having
ended in 2023, we have been developing a new LTS that will identify the Council’s
strategic direction from 2026 onwards to 2036 in terms of our transportation ambition
and potential areas for investment. 
3.5. A report to Committee on 23 April 2024 provided an interim update on the progress
of the LTS, including councillor and stakeholder engagement, required actions and
draft chapter layout.  An internal peer review of the draft chapters was undertaken,
and the finalised consultative LTS was subsequently shared with elected members
and to wider stakeholder consultation for further feedback towards the end of 2025. 
3.6. Electronic copies of the text from the LTS strategy have been circulated to all
members and hard copies have been made available in Member Services.  This
report provides a summary of the Vision, Objectives, Indicators and Themes and
Appendix A provides more detail in relation to the proposed policy and action areas. 
3.7.  Subject to approval by Committee, the approved LTS will progress to the publishing
stage, where it will be refined with enhanced graphics, improved layout, and
high-quality images to ensure it is clear, engaging and visually accessible for a wide
audience. 
4. Vision
4.1. Our vision builds on the themes developed through the previous LTS and reflects the
views and priorities expressed by the community during consultations.  It has also
been informed by a review of problems, issues and opportunities and policy context
relating to South Lanarkshire. 
4.2. The vision statement, set out below, details what the Council is aiming to achieve,
whilst having regard for the funding challenges facing the Council and the need to
focus on core activities.   
“Our transportation network will support net-zero carbon emission targets and make
it easier to move around by sustainable modes, helping to support improved health
and wellbeing.  It will be accessible, affordable, and integrated and provide
strengthened connectivity for urban and rural areas and increase the attractiveness
of South Lanarkshire as a place to live, visit, work, study and invest.  All transport
infrastructure operated and maintained by South Lanarkshire Council will be well
maintained, safe to use and support sustainable economic growth.” 
5.  Objectives and Targets
5.1.  The following objectives have been developed through analysis of problems, issues
and opportunities drawing on background data, trends, and local context to provide
an evidence base.  Informed through stakeholder engagement, these have been
designed to link seamlessly with the aims and objectives of other key local
strategies, as well as the local, regional, and national policy drivers:- 
1. Improve access for all to education and employment opportunities and key
services in urban and rural areas of South Lanarkshire, facilitating social
inclusion.
2. Ensure that South Lanarkshire is well-connected and integrated, to support
inclusive and sustainable economic growth.
3. Ensure that the transport network and assets are resilient, responsive to the
effects of climate change, and are well maintained.
58

Page 59

4. Improve the safety of South Lanarkshire’s transport network through a reduction
in the number and severity of accidents. 
5. Support decarbonisation of the transport network, including through mode shift,
reducing the need to travel and support for shared mobility practices.
6. Improve the health and wellbeing of South Lanarkshire residents through the
facilitation and encouragement of walking, wheeling, and cycling. 
5.2. Following the identification of the above objectives, a range of indicators
accompanied by directional targets have been identified.  Cognisance has been
taken of the importance of setting targets which can be monitored within the
resource constraints and enable progress to be demonstrated.  These, indicated
below, will be monitored by a range data sources and will assist in the monitoring of
the extent to which objectives, outlined in brackets, have been achieved. 
1. Modal Shift: Increase the share of workers and school pupils travelling by bus,
rail cycle, and foot (Objective 5 and 6).
2. Road Traffic: An overall decrease in the kilometres covered by private car use
and the number of specific sites experiencing traffic growth (Objective 5).
3. Road Condition: Reduce the proportion of roads categorised as being in need
for maintenance treatment (Objective 3).
4. Road Safety: Contribute to achievement of the Scottish Government national
road safety casualty reduction targets for 2030 and beyond (Objective 4).
5. Rail Patronage: Increase the number of passengers during the strategy lifetime
(Objective 5).
6. Bus Accessibility: Increase proportion of data zones in top 50% for access to
bus (Objective 1).
7. Economic Growth: Increase South Lanarkshire’s Gross Value Added (GVA) per
head and the number of full and part time jobs (Objective 2).
8. Emissions: Reduce the amount of greenhouse gas emissions attributed to
transport (Objective 5).
9. Low Carbon Emission Vehicles: Increase the number of low emission vehicles
in fleet (Objective 5).
10. Air Quality: Monitoring of PM10 and NO2 where required, and demonstrating
progress in reducing levels (Objective 5).
11. Active Travel Infrastructure: Improve quality (surfacing, minimum width,
segregated / shared use) of existing routes and add to this network where new
infrastructure would unlock new users, encourage modal shift and improve health
and wellbeing (Objectives 1, 2, 5 and 6).
12. Cycle Parking Provision: Increase the number of cycle parking spaces at key
facilities across the local authority area, facilitating and encouraging cycling and
improving health and wellbeing (Objectives 1, 2, 5 and 6). 
5.3. The achievement of the objectives and in turn meeting the targets noted above is not
only influenced by the actions that the Council pursues, but also by several outside
factors, ranging from funding availability, national economic trends, the actions of
others and even the changing climate and weather conditions. 
5.4. While the Council plays a key leadership role in shaping, promoting, and delivering
transport improvements, it is only one of many partners involved in achieving
meaningful change.  Successful transport outcomes rely on close collaboration with
national and regional agencies, transport operators, community organisations,
neighbouring authorities, and the private sector. 
59

Page 60

5.5. Many of the indicators used to measure progress such as those in relation to modal
shift, road safety, increased public transport use, economic growth or enhanced
active travel networks can only be met through shared commitment, coordinated
action, and collective investment and therefore do not sit with the Council alone. 
6.  Themes / Actions
6.1.  Policy and actions have been developed for the various individual service areas and
transport modes under the broad themes of:- 
 Chapter 9: Maintenance and Asset Management
 Chapter 10: Improving Road Safety
 Chapter 11: Economy and Regeneration
 Chapter 12: Sustainable Transport
 Chapter 13: Walking, Wheeling, and Cycling
 Chapter 14: Environment
 Chapter 15: Inclusive Mobility
 Chapter 16: Spatial Planning
 Chapter 17: Technology 
6.2.  The actions have different timescales associated with their delivery, however, the
timescales for delivery are within the 10-year lifetime.  Appendix 1 provides more
detail in relation to the proposed policy and action areas grouped together under the
above themes. 
6.3. A full mid-term review of the progress of the LTS will be undertaken which will
measure performance against the objectives detailed in section five.  Included in this
review will be monitoring of the actions identified within each themed section of the
LTS.  Annual monitoring of key actions will also be undertaken by way of the
Resource and Service Plan reporting frameworks. 
7.   Consultation 
7.1. During the initial period between July and September 2023, a consultation exercise
was undertaken to gather feedback on the key problems, issues and opportunities
relating to transport and access in South Lanarkshire that the new LTS should seek
to address.  This feedback has shaped the Vision Statement, Objectives, and
Indicators for the strategy. 
7.2. During December 2025, an online survey was promoted through the Council’s
website and social media platforms asking for feedback on the draft LTS.  A link to
the survey was shared with Members of the Scottish Parliament (MSPs), Members
of Parliament (MPs), local elected members, community groups, business groups,
tourism groups, transport operators, active travel groups / organisations, health
providers, education providers, enterprise networks, emergency service providers,
neighbouring authorities, community planning and disability and other vulnerable
user groups, and others. 
7.3. A total of 1,035 survey responses were received in 2023 and 144 in 2025.  All
feedback has been reviewed and considered, and where appropriate incorporated
into the final Strategy. 
8.  Employee Implications 
8.1. Over the next decade, delivering a comprehensive council transport strategy will
require a sustained, multidisciplinary team with capacity to plan, deliver, and monitor
long-term change. 
60

Page 61

8.2. Employees and/or consultancy resources will require strategic transport planners,
data analysts, and modelling specialists to develop evidence-based policies; project
managers and engineers to design and implement active travel, public transport, and
road network improvements; and engagement specialists to work with communities,
partners, and stakeholders throughout the process. 
8.3. Additional support from environmental analysts, digital and GIS specialists, and
funding/procurement officers will be essential to ensure the strategy aligns with
climate goals, embraces new technology, and is financially deliverable. 
8.4. Consistent investment in skills, succession planning, and staff continuity will be key
to maintaining momentum and ensuring the strategy evolves effectively over the full
10-year period. 
9. Financial Implications
9.1. Delivering this Strategy will require significant and sustained investment.  While there
are currently no major financial implications, funding levels will evolve annually
through the development of Resource and Service Plans which are influenced by
annual budget setting exercises and through external funding awards. 
9.2. Many of the more ambitious projects within the LTS will only be realised through
significant and reliable long-term funding streams, alongside sustained multi-year
revenue funding to keep the transport network safe, well-maintained, and resilient. 
9.3. External funding and partnership working remain critical to delivering much of the
Strategy.  However, these sources are not guaranteed and often rely on competitive
bidding processes and the Council’s ability to provide match funding.  As a result, the
extent to which policies can be progressed and actions fully implemented is linked to
the availability and security of funding. 
9.4. The Council has previously benefited from full or partial funding from partners such
as Strathclyde Partnership for Transport (SPT), the Walk Wheel Cycle Trust, and
Cycling Scotland.  Additional support is sometimes secured through capital grants
from the UK Government, Cycling Scotland, and other public and private
organisations.  Where appropriate, financial contributions are also sought from
developers through the planning system to support transport and access
infrastructure. 
9.5. While the Council welcomes opportunities for additional investment, the
unpredictable nature of many external funding streams and the changing
requirements of bid processes can limit long-term strategic planning.  As many
actions within the LTS depend on external support, funding uncertainty may
constrain the Council’s ability to deliver the full range of proposed actions and
measures. 
10.  Climate Change, Sustainability and Environmental Implications
10.1. The new Strategy reflects the growing urgency around climate change and the need
for a more sustainable, low-carbon transport system.  It responds to changing travel
patterns, evolving work and lifestyle behaviours, and increasing expectations for
greener, healthier travel options.
61

Page 62

10.2. It recognises transport’s significant contribution to carbon emissions and sets out a
clear commitment to supporting net-zero goals, improving air quality, and building
climate-resilient infrastructure.  Rapid advances in transport technology - including
electric vehicles, shared mobility, and intelligent systems - are also acknowledged as
key drivers of change. 
10.3. Overall, the Strategy aims to provide genuine, sustainable travel choices for people
living, working in, and visiting South Lanarkshire, promoting a shift towards active
travel, enhanced public transport, and low-carbon mobility solutions. 
11.  Other Implications
11.1. In parallel with the production of the LTS, an Environmental Assessment of the
Strategy has been undertaken in accordance with the provisions of the 2005 Act. 
This is an integral part of the decision-making process that has informed the policies
identified within the LTS. 
11.2. There are no specific risks associated with this report at this stage other than those
set out above relating to the need for financial and employee resources to deliver on
the policy and action commitments. 
12.  Integrated Impact Assessment and Consultation Requirements
12.1.  This LTS has been subject to an Integrated Impact Assessment, which has
incorporated the following:- 
 Equalities Impact Assessment (EqIA) including human rights’ considerations
 Children’s Rights and Wellbeing Impact Assessment (CRWIA)
 Fairer Scotland Duty Assessment (FSDA)
 Health Inequalities Impact Assessment (HIIA) 
12.2. The assessment has considered sex, age, disability, race, religion/belief, gender
reassignment, sexual orientation, pregnancy and maternity, and marriage and civil
partnership as well as other relevant issues such as mental health and wellbeing. 
12.3. This assessment has been undertaken to ensure that actions identified within the
LTS have a positive impact on different groups in society, including groups with
protected characteristics, as defined by the 2010 Equality Act, children, and young
people, and those experiencing inequalities because of socio-economic
disadvantage. 
12.4. Extensive consultation has been undertaken as noted within section 7 of this report. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
17 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open and sustainable
62

Page 63

 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resources Committee - 23 April 2024 - Local Transport
Strategy 2024 to 2034 Update 
List of Background Papers
 Draft Local Transport Strategy 2026 to 2036 
Contact for Further Information
If you would like to inspect the background papers or want further information, contact:- 
Colin Park, Head of Roads, Transportation and Fleet Services
Ext:  4484  (Tel:  01698 454484)
E-mail:  Colin.Park@southlanarkshire.gov.uk
63

Page 64

64

Page 65

Appendix 1: Draft Local Transport Strategy Policies and Actions
Chapter 9: Maintenance and Asset Management  
Policy   Action
P1 The Council will seek to inspect and maintain footways, cycleways
and roads infrastructure in a safe condition in accordance with the
Roads Asset Management Plan. 
A1 Provide prioritised maintenance of footways, cycleways and roads
infrastructure.
P2 The Council will explore ways to enhance the level of investment
available for maintenance of assets and infrastructure across all
modes and will seek new funding sources to upgrade and move
towards low carbon assets where appropriate.
A2 Implement the Roads Asset Management Plan for footways,
cycleways and road and footway improvements.
P3 The Council will seek to reduce the volume of and cost of public
liability claims.
A3 Prioritise and undertake repairs to reported road defects.
P4 Continue to invest in traffic management systems and traffic signals
infrastructure and seek new funding sources to upgrade and move
towards low carbon assets.
A4 Continue to invest in new technology with respect to maintenance
techniques, to improve output, quality, health and safety and
sustainability.
P5 Ensure that a high-quality traffic signal maintenance system is in
place to ensure the safe operation of junctions and pedestrian / cycle
crossings.
A5 Annual programme of traffic signal improvements, as resources
permit.
P6 Prioritise the replacement of outdated equipment and installations
by means of a criteria-based scoring system.
A6 Ensure that traffic signal faults are responded to within the set
timescales and monitor our performance in meeting these
timescales.
P7 Improve walking and cycling facilities at traffic signals and
carriageway crossings, including detection for cyclists and improving
crossing facilities for disabled users, where appropriate.
A7 Provide regular maintenance inspections for all traffic signal
infrastructure.
P8 Identify and implement suitable Intelligent Bus Priority at signalised
junctions to minimise bus journey times and improve their reliability.
A8 Update annually and implement the Winter Service Procedures and
Resources document.
P9 Take reasonable steps to prevent snow and ice endangering the safe
passage of pedestrians and vehicles over public roads.
A9 Following receipt of adverse winter conditions forecast treat the road
network on a precautionary basis in accordance with the Winter
Service Plan.
P10 Implement a method of working which will minimise delays,
diversions or road closures due to adverse weather as far as is
reasonably practical.
A10 Following receipt of adverse winter conditions forecast treat the
footway network on a precautionary basis in accordance with the
Winter Service Plan.
8
65

Page 66

Chapter 9: Maintenance and Asset Management  
Policy   Action
P11 Respond to serious hardship during extended periods of severe
weather.
A11 During extreme weather conditions treat secondary and extreme
(road) routes as resources permit.
P12 Provide and maintain a high quality, safe and sustainable street
lighting service across South Lanarkshire.
A12 During extreme weather conditions treat (footway) accessibility
routes and the rest as resources permit.
P13 Pursue technological development in materials including longer
lamp lives and rechargeable apparatus and Intelligent Street Lighting
to deliver energy efficient and low carbon street lighting.
A13 Continue to embrace new technology where this is proven to be of
economic, environmental and operational benefit.
P14 Prioritise the works by means of a criteria-based scoring system, for
example presence in crime hot-spots.
A14 Continue to be involved in national working groups through the
Scottish Collaboration of Transportation Specialists (SCOTS) and
local groups to enable joint working.
P15 Minimise vandalism by installing suitably robust equipment in
potentially problematic areas.
A15 Continue an annual programme of street lighting improvements to
identify priorities for column renewal and other maintenance
requirements.
P16 Under the powers available, take steps to improve the quality of
public utility reinstatements thus ensuring the long-term integrity of
the road-based network.
A16 Work with Statutory Undertakers to improve the quality of public
utility reinstatement work.
P17 Ensure effective management of works on the road network to
minimise delays for all users.
A17 Co-ordinate roadworks through the SRWR to ensure that delay and
disruption to the network users is minimised.
P18 Prioritise investment to bridges and structures for which the Council
is responsible, seeking to ensure they are safe for use and fit for
purpose.
A18 Continue to establish and approve diversion routes for planned
maintenance works.    
A19 Deliver strengthening programme for substandard publicly owned
bridges.    
A20 Progress the upgrading of vehicle containment characteristics at
bridges with substandard capability.    
A21 Programme the strengthening or implementation of alternative
interim measures at substandard privately owned bridges carrying
public roads. 
66

Page 67

Chapter 10: Improving Road Safety  
Policy   Action
P19 Reduce the number and severity of road traffic collisions across
South Lanarkshire, supporting the Road Safety Framework and
contributing towards the achievement of national casualty reduction
targets.
A22 Monitor and investigate accidents and their causes to inform the
design and introduction of accident reduction measures and
initiatives.
P20 Develop annual programme that targets resources and
improvements on routes where three or more injury accidents have
occurred in the previous three years or on routes that have an injury
accident rate greater than the national average for the type of route.
A23 Support and encourage the implementation of 20mph speed limits in
towns / neighbourhood centres, residential areas and outside
schools.    
A24 Support investigation and implementation of reduced speeds on rural
roads, where appropriate.    
A25 Ensure that the design and implementation of major road-based
schemes is subject to a Safety Audit, as necessary.    
A26 Continued promotion of road safety education and training initiatives.    
A27 Continue to collaborate with other local authorities in the Road Safety
Framework Local Partnership Forum (West) to share best practice
education and engineering in relation to road safety initiatives. 
Chapter 11: Economy and Regeneration  
Policy   Action
P21 Support the increase and enhancement of active travel, public
transport and shared transport connectivity to support town centre
economies and areas of employment.
A28 The Council will review existing and consider the introduction of new
Traffic Regulation Orders (TROs) in areas where parking causes safety
and/or congestion issues.
P22 Support the increase and enhancement of transport connectivity for
rural communities - particularly to town centres, places of
employment and key public transport and shared transport
interchange points.
A29 Implement the national pavement parking prohibitions on appropriate
roads as set out in the Transport (Scotland) Act 2019.
P23 Facilitate increased and enhanced active travel and public transport
connectivity to support major new developments such as the
A30 The Council will ensure that all temporary TROs are accessible to the
public through the Council’s internet site.
67

Page 68

Chapter 11: Economy and Regeneration  
Policy   Action
Community Growth Areas in South Lanarkshire and the redevelopment
of our town centres.
P24 Work with partners to aim to reduce car vehicle kilometres across
South Lanarkshire to contribute to national targets.
A31 Where necessary, undertake assessments of the appropriateness of
waiting and loading times in urban centres
P25 Encourage and support the development of parking practices and
measures that encourage more sustainable travel behaviours, in line
with the Sustainable Travel Hierarchy.
A32 Support partners to improve rail freight connectivity.
P26 In town centres, if it becomes necessary to improve and / or regulate
service access to shops and businesses, the Council will consider
revised traffic / parking management.
A33 Encourage the sustainable movement of goods within built up areas,
particularly last-mile deliveries.
P27 Support the improvement of freight transport facilities in South
Lanarkshire to facilitate a sustainable, efficient, resilient and reliable
strategic freight transport network.
A34 Encourage and support the development of urban freight
consolidation and distribution hubs and networks in key locations,
where appropriate.
P28 Monitoring of waiting and loading times to ensure that they are
appropriate, to support economic wellbeing of urban centres and
improve road safety.
A35 Support the growth in cycle logistics and cargo bikes as well as
innovation in ‘last mile’ deliveries in South Lanarkshire towns.
P29 Support the innovation and best practice in freight transport, with
partners.
A36 Review, increase and enhance sustainable transport access to town
centres and growth areas in South Lanarkshire, particularly from rural
areas.
P30 Encourage developers to consider rail as an alternative to road for
moving freight. Where road is the only viable option, we will encourage
best practice to be pursued.
A37 Subject to successful progression through the business case process,
progress the Stewartfield Way Enhancement and the Hamilton and
East Kilbride town centre projects.
P31 Support and lobby partners to improve affordable access to education,
training and employment for South Lanarkshire residents by active and
sustainable transport where possible.
A38 Subject to funding and support from partner organisations, evaluate
and progress the Lanark Town Centre Circulatory System project.
P32 Continue to support economic growth in South Lanarkshire, by
supporting and facilitating sustainable access to economic centres for
people and goods.    
P33 The Council will support new roads infrastructure where this is
considered essential, taking cognisance of the Sustainable Travel    
68

Page 69

Chapter 11: Economy and Regeneration  
Policy   Action
Hierarchy and Sustainable Investment Hierarchy. 
Chapter 12: Sustainable Transport  
Policy   Action
P34 Work with partners to examine accessibility to town centres,
employment centres, colleges and universities, hospitals and key
sustainable transport hubs/interchanges, particularly for rural
communities and areas of socio-economic deprivation, to identify
the need for enhanced public transport services.
A39 In partnership with bus operators and SPT, improve the quality,
frequency and reliability of bus services as identified within SPT's
Regional Bus Strategy.
P35 Work with partners to promote public transport as an integrated, safe
and accessible system for all users.
A40 Support Transport Scotland, SPT and other partners to develop Clyde
Metro for the Glasgow City Region, extending into South Lanarkshire.
P36 Support and encourage development of public transport with the aim
of increasing the proportion of journeys that are made by bus and rail,
to provide continued improvement in the transportation choices in
South Lanarkshire to attract inward investment, encourage economic
development and improve the environment and health and wellbeing
of communities.
A41 Work with partners to explore opportunities to introduce new rail
infrastructure in South Lanarkshire.
P37 Seek to improve the quality of bus services in partnership with SPT. A42 Work with partners to enhance bus network coverage, including in
rural areas of South Lanarkshire and to improve connectivity with
neighbouring local authorities and Edinburgh.
P38 Lobby Transport Scotland for the introduction of new and improved
rail services and infrastructure. This will include the following longer-
term potential projects:
• Direct Lanark to Edinburgh service;
• Extension of the Larkhall railway to Stonehouse and beyond
to the Avon Valley;
A43 Work with partners to explore opportunities to increase rail service
frequency at stations served in South Lanarkshire.
69

Page 70

Chapter 12: Sustainable Transport  
Policy   Action
• New stations at Symington and Law;
• Improved services between Carluke, Carstairs and
Edinburgh.
P39 Work with SPT and other partners to extend the network of Demand
Responsive Transport and Community Transport provision, taxis,
shared transport and shared mobility to ensure public transport is
available to all communities across South Lanarkshire.
A44 Work with SPT and bus operators to identify opportunities to pursue
the implementation of more direct bus services to hospitals and
healthcare facilities from key areas.
P40 Continue to support the concessionary fare provision across all
forms of public transport in South Lanarkshire.
A45 Promote an approach to shared transport provision that benefits
people across South Lanarkshire
P41 Support the introduction of low emission vehicles as a sustainable
alternative to internal combustion vehicles.
A46 Provide clear and consistent wayfinding to and from public transport
hubs in South Lanarkshire to provide connections to key employment
and education sites.
P42 Review and, where appropriate, expand Park and Ride provision to
encourage use of public transport for longer journeys.    
P43 Support and encourage multi-modal journeys that allow interchange
between rail, bus, car and active travel modes. This includes
supporting national government, SPT and public transport operators
in their efforts in the development of multi-modal, integrated
through-ticketing and promotion of existing integrated tickets
including ZoneCard. 
A47 Support the City Region in developing a commercial contract that will
provide, manage and maintain a network of publicly available electric
vehicle charging infrastructure.
P44 Work with partners to increase modal integration, for example to
make it easier to travel on public transport with cycles; ensuring
there is adequate cycle parking at public transport interchange
locations; ensuring hire / access points for shared mobility schemes
are well-served by public transport links; and exploring the concept
of Mobility Hubs where appropriate. 
A48 Continue to decarbonise the Council’s fleet through delivery of the
Fleet Strategy.
P45 Work with partners to develop fully accessible facilities at transport
interchanges.     
70

Page 71

Chapter 13: Walking, Wheeling and Cycling  
Policy   Action
P46 Aim to achieve a step-change in the proportion of journeys that are
undertaken by walking, wheeling and cycling in South Lanarkshire,
and to make active travel the most popular choice for everyday short
journeys, thereby supporting the Active Travel Framework.
A49 The Council will seek to increase the number of schools that develop
travel plans.
P47 Ensure active travel networks are convenient, accessible, inclusive
and safe, with segregation from motorised traffic where possible.
A50 Support Connected Neighbourhoods through active travel provision
(20-minute neighbourhoods).
P48 Recognise and support the needs of people with disabilities and
other protected characteristics designing new transport schemes or
replacing infrastructure.
A51 Support local groups who seek to improve access to bicycles in South
Lanarkshire through interventions that would build on existing
successful programmes and the work of established support groups.
P49 Continue to support and encourage children to travel actively with
the aim of increasing the proportion of journeys that are made to
school by walking, wheeling or cycling.
A52 Increase the availability of cycle training courses, including
Bikeability.
P50 Increase access to bicycles, including e-cycles and other adapted
and non-standard cycles.
A53 Increase the number of cycle parking spaces available, including at
key destinations such as bus and rail stations and town centres. 
A54 Progress the implementation of the Active Travel Network Plans for
Carluke; Lanark; Hamilton; East Kilbride; Rutherglen; Cambuslang;
Clydesdale, Strathaven, Stonehouse and the Surrounding Villages;
Bothwell, Blantyre and Uddingston; and Larkhall, and support the
implementation of the Walk Wheel Cycle Trust Network Development
Plans for the National Cycle Network.    
A55 Support and promote more sustainable travel behaviours for all
journeys in South Lanarkshire, including those made for leisure,
recreation and tourism purpose.    
A56 Work with SPT to investigate opportunities for a regional, cross-
boundary bike hire scheme. 
71

Page 72

Chapter 14: Environment  
Policy   Action
P51 Continue to work with partners to facilitate a switch from
conventionally fuelled vehicles to electric, hydrogen and other
alternative fuels, including extending the electric vehicle charging
infrastructure network.
A57 The Council will continue to operate its continuous monitoring
equipment in the areas which are most likely to be closest to
breaching the objectives for PM10 and NO2 Where necessary,
detailed assessments will be carried out at locations such as
Rutherglen Main Street and Hamilton town centre, and NO2 in Main
Street, Uddingston and these will be reported annually.
P52 Continue to monitor and work to meet, and wherever possible
exceed, statutory air quality requirements.
A58 The Council will continue to monitor air quality at key locations across
South Lanarkshire, with a focus on protecting, and, where possible,
improving air quality.
P53 Place greater emphasis on integrating air quality considerations into
strategies, policies and plans.
A59 The Council will develop a South Lanarkshire-wide Air Quality Strategy
P54 Ensure that new developments and schemes undertake
Environmental Assessments and minimise carbon and other harmful
emissions, where appropriate.
A60 Encourage bus operators (including Demand Responsive and
Community Transport providers) to decarbonise fleets, upgrade
depots and develop partnerships with energy providers.
P55 Support the implementation of transport improvements that reduce
emissions and improve air quality across South Lanarkshire, giving
particular protection to former Air Quality Management Areas and,
where appropriate, contributing to the development of a South
Lanarkshire-wide Air Quality Strategy
A61 Continue to assist local businesses through the ECO Stars fleet
recognition scheme.
P56 Require Flood Risk Assessment (FRA) and Sustainable Urban
Drainage Systems (SuDS) to be provided by developers to support
Planning Applications. This will include independent checks for both.
Future maintenance of (SuDS) apparatus will also be identified and
agreed with the Council.
A62 Following receipt of a Heavy Rainfall Warning, the Council will invoke
the procedures outlined in the “Managing Flood Risk” document to
assess and maintain the ‘at risk’ flood sites identified in the
document. The River Clyde Multi-Agency Incident Response Guide
will be used to provide a Council response to significant flooding from
the River Clyde.
P57 Encourage provision of infrastructure designed to withstand the
impacts of flood events.
A63 Continue an annual programme of prioritised flooding improvement
projects.
P58 Undertake statutory duties under the Flood Risk Management
(Scotland) Act 2009.
A64 Actively participate in the Clyde and Loch Lomond and the Tweed
Flood Risk Management Plan Districts and in the development and
implementation of future iterations of the associated District Flood
Risk Management Plans.
72

Page 73

Chapter 14: Environment  
Policy   Action
P59 Continue to lobby the Scottish Government whenever possible to
carry out the following: 
• Define light pollution as a statutory nuisance and draw up
regulations which would enable local authority
environmental health officers to deal with it. 
• Introduce new regulations, through land use planning
legislation, to allow planning authorities to control exterior
lighting.
• Ensure any planning policy statements address light
pollution and acknowledge the importance of the dark.
• Ensure policies and operations of all government
departments and public agencies take account of the need
to tackle light pollution.
A65 Minimise environmental impact by not over-lighting, using energy-
efficient light sources, and by installing dimmable luminaires
wherever possible - including in all new housing developments - in
accordance with EN13201: 2015.
P60 Deliver low carbon and energy efficient street lighting. A66 A preference for post mounted luminaries rather than post top will be
pursued wherever possible.
P61 Work with partners to reduce noise impacts of transport in line with
the Environmental Noise (Scotland) Regulations 2006.
A67 Give due consideration to designated Noise Management Areas and
Quiet Areas in any future relevant strategies, policies and plans.
P62 Seek to ensure any future developments do not negatively impact on
the noise climate within areas with designated Quiet Area status.
A68 Encourage the implementation of biodiversity schemes, for example
on road-side verges or alongside active travel networks.
P63 Effectively coordinate the delivery of new transport infrastructure to
ensure that opportunities to improve green and blue infrastructure
networks and ecological corridors are maximised within South
Lanarkshire.
A69 Aim to offset the loss of any biodiversity through transport
infrastructure development or maintenance within the Council’s
control.
P64 Actions proposed by the LTS which could rise to likely significant
effects on a European site (including existing and proposed such
sites), must be subject to an Appropriate Assessment of the
implications for the Conservation Objectives of that site. 
A70 Restrict impacts of transport in South Lanarkshire which could
adversely affect European sites (Special Areas of Conservation /
Special Protection Areas).
P65 Continue to work with partners, including the Scottish Government,
to identify new sources of funding for climate change adaptation,
including increased funding to replace, upgrade and maintain
A71 Support the delivery and monitoring of the Council’s Sustainable
Development and Climate Change Strategy and Action Plan. 
73

Page 74

Chapter 14: Environment  
Policy   Action
transport assets.
P66 Ensure new transport schemes are future-proofed against the
impacts of climate change.
A72 Where possible, increase resilience of South Lanarkshire's transport
network to climate change-related disruption, including flooding and
extreme heat events.
P67 Facilitate and support adaptation of the local transport network to be
resilient to climate change and disruption from extreme weather
events.   
Chapter 15: Inclusive Mobility  
Policy   Action
P68 Work towards an accessible, affordable and safe transport system in
South Lanarkshire, in services and infrastructure across all forms of
travel.
A73 The Council will support the construction of transport facilities that
incorporate inclusive design processes which are safe and
convenient for all users, including those with disabilities.
P69 Continue to remove barriers to inclusive mobility through applying
the Equality Act 2010 and Equality Impact Assessment process to
transport project design and policy development.
A74 Develop and facilitate the role of active travel as an affordable
transport option.
P70 Promote inclusive design and ensure this is implemented in the
design process of new transport facilities.
A75 Support the inclusion of adapted bikes and other non-standard bikes
in access to bike schemes and projects.
P71 Continue to support and work with SPT to develop and promote
MyBus and MyBus Rural services to older and disabled residents in
South Lanarkshire.
A76 Review signage at existing Council owned car parks across South
Lanarkshire.
P72 Prioritise the movement of pedestrians and those with mobility
difficulties when planning new transport interventions within
pedestrian environments (for example cycle parking and electric
vehicle charging infrastructure).
A77 Support the promotion of the Scottish Government’s Young Persons’
(Under 22s) Free Bus Travel Scheme through schools, further
education establishments and youth groups.
P73 Enforce pavement parking prohibitions on appropriate roads in line
with the Transport (Scotland) Act 2019.
A78 Work with partners to provide sustainable transport information (for
example timetables and route information) in alternative formats and
languages, where required, to ensure inclusive communication.    
A79 Work with partners / SPT to support the improvement of public
74

Page 75

Chapter 15: Inclusive Mobility  
Policy   Action
transport services in rural and socio-economically disadvantaged
areas of South Lanarkshire.    
A80 Ensure inclusive access is a key objective when developing new forms
of transport services and infrastructure including provision for electric
vehicles.  
Chapter 16: Spatial Planning  
Policy   Action
P74 Require that major new developments are accessible by sustainable
modes, in line with the Sustainable Travel Hierarchy, including walking,
wheeling and cycling for short journeys and links to public transport
and shared transport interchange points for longer journeys.
A81 The Council will undertake early engagement with land-use planning
teams to deliver an infrastructure-first approach to planning,
promoting the NTS2 Sustainable Travel and Investment Hierarchies.
P75 Require that all new developments have provision for electric vehicle
charging.
A82 The Council will work with community and development planning
teams to support spatial planning concepts, guide the development
planning process and help deliver more liveable neighbourhoods.
P76 Require that the transport implications of major developments be set
out in Transport Assessments and, for minor developments, within a
Transport Statement.
A83 The Council will encourage electric vehicle charging to be provided for
all new developments and that car clubs will be encouraged through
the development management process
P77 Require the preparation and implementation of travel plans for major
developments as part of planning / legal agreements.
A84 Ensure that the transport implications of major developments be set
out in Transport Assessments and, for minor developments, within a
Transport Statement.
P78 Work in partnership with the Planning Service to ensure the
preparation of LDP3 is informed by evidence of the area’s transport
infrastructure capacity and the carrying out of an appraisal of the
spatial strategy on the transport network to identify any potential
cumulative transport impacts and its mitigation.    
P79 Require either direct provision of transport infrastructure by developers
and landowners, or contributions towards the cost in whole or in part
of transportation works (including public transport provision) to be    
75

Page 76

Chapter 16: Spatial Planning  
Policy   Action
provided by others including the Council itself.
P80 Require that all new developments consider the principles of Designing
Streets, National Roads Development Guide and Cycling by Design.    
P81 Deliver spatial planning concepts, for example the concept of 20-
minute neighbourhoods, through planning and economic policies and
in collaboration with key stakeholders, to create liveable
neighbourhoods that reduce the need to travel.     
Chapter 17: Technology  
Policy   Action
P82 The Council will continue to invest in, and apply for funding for,
technology that prioritises sustainable modes (for example,
pedestrian, cyclist and bus priority) on relevant routes.
A85 Work with partners to advance digital technology to support
sustainable access and travel, including, for example, Mobility as a
Service, smart technology and digital ticketing, where appropriate.
P83 Reduce the need to travel by supporting development of digital and
remote access to public services.
A86 Promote the expansion of the current electric vehicle charging point
network across South Lanarkshire, supporting the delivery of our
Public Electric Vehicle Charging Strategy and Expansion Plan.
P84 Expand the network of electric vehicle charging infrastructure to
encourage greater use of low carbon vehicles.
A87 Support partners to promote and raise awareness of technology and
initiatives that provide passengers with timely and up to date
information to help them to make informed decisions in order to
complete their journeys to, from and within South Lanarkshire.
P85 Support the planning for refuelling points for alternative-fuelled
goods vehicles in the future (such as electric), particularly in close
proximity to the strategic road network.
A88 Facilitate the introduction of real-time information to allow transport
users to respond to extreme weather and incidents.
P86 Consider the role of AI and Connected Vehicle Data in transport
service delivery at a local level in South Lanarkshire.
A89 Take cognisance of, and integrate with, SLC Digital Strategy 2022-
2027 where appropriate.    
A90 Support development of Mobility as a Service (MaaS) solutions to
serve those using the transport network in South Lanarkshire. 
76

Page 77

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Review of the Management of Trees 
1. Purpose of Report 
1.1. The purpose of the report is to:- 
 provide the background to tree management requirements in South Lanarkshire,
including an overview of the relevant legal obligations and policy commitments
 outline the actions that have been implemented to date to allow the Council’s
Arboriculture Team to move towards a more proactive, risk-based model of
service delivery
 outline the proposals for a wider review of tree management and the
development of an overarching Tree Canopy Cover Strategy 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report, be noted; and
(2) that the proposed next steps set out in section 7 of the report be approved. 
3. Background
3.1. A motion was approved by South Lanarkshire Council on 10 December 2025 which
noted the financial risks and implications of Ash Dieback Disease (ADD), community
concerns about the height and maintenance of trees, and the risks associated with
adverse weather events.  In response to these concerns, it was agreed that a review
of tree management was to be undertaken and that the outcome of the review would
be reported to Community and Enterprise Resources Committee for further
consideration. 
3.2. This report is the first step towards addressing the motion.  It is intended to provide
an overview of the Council’s approach to tree management and set out proposals to
review the service and develop a Tree Canopy Cover Strategy. 
4. Tree and Woodland Assets in South Lanarkshire 
4.1. South Lanarkshire has diverse and historically significant tree and woodland assets
which extend from the coniferous forests and dispersed semi-natural woodlands of
the Southern Uplands to the ancient woodlands of the Clyde Valley (e.g. New
Lanark), and to some of Scotland’s finest riverine and gorge ancient woodlands (e.g.
Chatelherault).  Closer to urban communities, there are also ancient and semi-
natural woodlands (e.g. Calderglen) along with remnant historical trees and maturing
‘New Town’ landscaping.  Moreover, South Lanarkshire features notable tree
specimens, including the legacy orchards of the Clyde Valley, the yew trees of
9
77

Page 78

Hamilton Mausoleum, and the 800-year-old Cadzow Oaks, which are thought to be
amongst the oldest broadleaved trees in Scotland. 
4.2. South Lanarkshire’s trees and woodlands include nationally and locally important
designations, including Sites of Special Scientific Interest (SSSI), National Nature
Reserves (NNR), Local Nature Reserves (LNR) and Sites of Importance for Nature
Conservation (SINC). 
4.3. South Lanarkshire’s woodland assets cover approximately 33,901 hectares
comprising around 18% predominantly broadleaved woodland’ and 49% ‘coniferous
and other plantation woodland’.  The Council’s Arboriculture Team estimates that
overall tree canopy cover in South Lanarkshire is in the region of 17%.  In terms of
urban tree cover, the Clyde Climate Forest (CCF) and Forest Research (FR)
recorded that canopy cover in South Lanarkshire’s urban areas was 17.2%.  These
estimates suggest that canopy cover in South Lanarkshire is currently below the
Scottish Government’s canopy target of 21% for Scotland and the CCF’s target for
urban areas (20%).   
4.4. Assessments undertaken by the Arboriculture Team estimate that the Council is
responsible for more than 2.8 million trees in total.  Tree assets are found in
extensive wooded areas (covering an area of approximately 1,300 hectares) but
there are also estimated to be around 68,000 individual trees located within
residential streets and neighborhoods, parks, schools and along the road network. 
4.5. Ash Dieback Disease (ADD) remains the most significant threat to broadleaved trees
in the UK.  It is estimated that 50–75% of ash trees in Scotland will decline or die
over the next two decades.  Visual tree assessments by the Council’s Arboriculture
Team have identified more than 134,000 trees that may need Council intervention
due to ADD.  It is estimated that there may also be another 7,000 trees, still to be
assessed, that could need Council intervention. 
4.6. Changing attitudes towards risk and liability (possibly due to the increase in number
and severity of adverse weather events) have contributed to an increase in the
number of enquiries received by the Arboriculture Team in recent years.  During
2024/2025, the team received in the region of 5,000 tree-related enquiries.  Although
most enquiries are requests for intervention (e.g. tree felling or pruning) there is also
an increase in enthusiasm for tree protection and tree planting programs which
coincides with a greater awareness of the benefits that trees and nature can provide. 
5. Legal and Policy Considerations 
5.1. The Council has statutory obligations regarding the management of trees.  Detailed
information can be found in Appendix 1 of this report, but a summary of relevant
legislation and policies is set out in sections 5.2 to 5.6 below. 
5.2. The Council is a landowner, a Planning Authority and a Roads Authority, meaning it
has statutory responsibilities for trees and woodland in its area.  These statutory
obligations mean the Council is required, amongst other things, to manage tree-
related risk on its land and within the road network.  The Council also has a duty to
protect existing trees and plant new ones through the Planning framework. 
5.3. The Council’s approach is also determined by national and local policy and strategy. 
This includes Clydeplan’s Woodland and Forest Strategy for the Glasgow City
Region 2020, the Council’s Local Development Plan, the Council’s Sustainable
Development and Climate Change Strategy 2022-2027 and the Scottish
Government’s Biodiversity Strategy 2024-2030. 
78

Page 79

5.4. The Council is also committed to the Clyde Climate Forest (CFF) which promotes
targeted urban canopy expansion across the Glasgow City Region, the Broadleaved
Nature Networks, and national initiatives such as Tree Equity which focuses on
providing fair access to trees and their benefits for all communities. 
5.5.  The Council’s Ash Dieback Action Plan (ADAP) sets out a strategic, resilience
building, risk-based, approach for managing ADD and was approved by Community
and Enterprise Resources Committee on 17 September 2024.   
6. Approach to Tree Management and Progress to Date
6.1. While the tree assets outlined in section 4 of this report, bring significant benefits,
there is an ongoing requirement for a well-governed management approach
supported by adequate resources. 
6.2. During the 18-month period between September 2023 and March 2025, which
included the aftermaths of Storm Agnes and Storm Eowyn, arbor costs associated
with responding to tree related incidents caused by severe weather were in the
region £0.690m.  To mitigate this additional workload and reduce future ad-hoc
costs, the Council must continue to move away from the previous reactive model to a
more proactive, risk-based approach to tree assets. 
6.3. In recent years, the Council has strengthened its arboriculture workforce and
invested in the purchase of specialist arboricultural equipment, including a mobile
elevated work platform (MEWP), a forestry forwarder trailer, and a tractor winch. 
6.4. The Arboricultural Team has also worked with Personnel Services to introduce 2
‘Grow our Own’ succession planning posts (a total of 4 employees over a 2-year
period), which led to one full-time permanent position within the Arboriculture Team. 
6.5. The Service has also appointed an Assistant Arboriculture Officer to support 
ADD work and provided additional training to upskill a further 38 Grounds 
employees, allowing them to safely operate specialist equipment including 
chainsaws, machinery and plant. 
6.6. To allow the effective management of trees, the Service invested in advanced tree
asset software (Tree Plotter).  The system has been crucial in recording information
about our woodlands and is an invaluable tool to aid the understanding of the
Council’s tree assets and demographics.  The software also enables the Council to
quantify ecosystem services and estimate the monetary value of individual trees,
supporting evidence-based decision-making. 
6.7. Given the extent of the woodlands managed by the Council and in recognition that
proactive management is more cost-effective in the medium to long term, the Service
has utilised monies from the Scottish Government’s Nature Restoration Fund (NRF)
to commission the development of 12 Urban Woodland Management Plans
(UWMPs).  The contract for this work was awarded in February 2025 and the draft
plans, which will contain recommendations for managing the woodland assets in line
with legal requirements, are expected to be completed by the end of October 2026. 
6.8. The Service has strengthened community engagement and delivery through
partnership working.  For example, the team has worked with The Conservation
Volunteers (TCV) and the CCF.  Partnership working has enabled the development
of initiatives such as Volunteer Tree Wardens which delivered targeted tree planting
within priority neighborhoods.  Match-funded support from The Tree Council has
79

Page 80

facilitated the piloting of 3 Community Tree Nurseries (CTNs) within schools and has
contributed to the ‘Young Tree Champions’ programme.  Additional funding and
community focused delivery have been provided by Trees for Cities, with additional
financial support coming from Future Woodland Scotland.  These partnerships
support increased capacity, leading to greater involvement in care and stewardship
of tree assets within the community. 
6.9. A summary of the progress made to date can be found in Appendix 2 of this report. 
7. Proposed Next Steps 
7.1. It is proposed that the Countryside and Greenspace Team will complete a review of
tree management in South Lanarkshire over the next 18 months.  The review will
consider strengthening the Council’s move towards a pro-active approach to tree
management.  A report will be then presented to Community and Enterprise
Resources Committee detailing any recommendations from the review process. 
7.2. Running concurrently with the review, the Countryside and Greenspace Team will
develop a draft Tree Canopy Strategy which, as well as setting out the Council’s
priorities and objectives for the next 10 years, will fulfil the Council’s statutory duty to
prepare a Forestry and Woodland Strategy.
7.3. In addition to the workstreams referred to at sections 7.1 and 7.2 above, the Service
will undertake a review of the recommendations from the UWMPs currently being
prepared on behalf of the Council with the aim of recommending a long-term
programme of works for the management of 927 hectares of wooded areas and
identifying any potential funding opportunities. 
8. Employee Implications
8.1. There are no additional employee implications at this time.  Any employee
implications that may be identified as part of the next steps will be reported to the
appropriate committee in due course. 
8.2. To date, Grow Our Own initiatives have resulted in a total of 4 arboriculture trainees
(over a 2-year period) and one full-time post within the Arboriculture Team.  The
Service has also recruited one Arboriculture Assistant from ADD capital funding. 
9. Financial Implications
9.1. There are no additional financial implications associated with this report at this time. 
Any future financial implications identified as part of the next steps will be reported to
the appropriate committee in due course. 
9.2. Tree work resulting from extreme weather events between 2023 and 2025 cost the
Council an estimated additional £0.690m. 
9.3. The Council received £0.593m from the Scottish Government’s Nature Restoration
Fund in 2025/2026. Approximately £0.308m of which has been allocated to tree and
woodland related projects.   
9.4. In the last three years, the Service has also secured a total of £0.091m of external
funding and £0.016m in match-funding from organisations including Future
Woodlands Scotland, the Tree Council and Trees for Cities. 
9.5. The Council allocated the following capital funding to manage Ash Dieback Disease:
£0.500m in 2023-24, £0.200m in 2024-25, and £0.200m in 2025-26. 
80

Page 81

10. Climate Change, Sustainability and Environmental Implications
10.1.  Where trees are not effectively protected, enhanced, and managed, poor or
inappropriate tree care could result in long-term changes to the landscape,
reductions in tree populations and canopy cover, and loss of the benefits trees
provide (i.e. ecosystem services). 
10.2.  By using a proactive approach to tree and woodland asset management, the Council
will strengthen resilience through improved tree/woodland structure, increased
species diversity, sustained canopy cover, and more equitable engagement and
ownership across communities. 
11. Other Implications
11.1.  By taking a proactive, risk-based approach to tree management, the Council will
reduce exposure to liability claims and reputational risk associated with known or
foreseeable tree-related hazards. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required.  There is no requirement to undertake any consultation at
this time in terms of the information contained in this report.  However, as detailed
proposals are developed, these will be subject to appropriate consultation
arrangements. 
12.2. The Council’s Strategic Environmental Working Group will be involved in the
development of the Tree Canopy Cover Strategy. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
23 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Improve the quality of life of everyone in South Lanarkshire
 Make communities safer, stronger and sustainable
 Improve health, care and wellbeing
 Work with communities and partners to promote high quality thriving and sustainable
communities
 Improve the road network, influence improvements in public transport and encourage
active travel 
Previous References
 Community and Enterprise Resources - Ash Dieback Disease (ADD) - 17 September
2024
 South Lanarkshire Council – Notice of Motion - Review of the Management of Trees -
10 December 2025 
List of Background Papers
 None 
81

Page 82

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kirsty McGuire, 
Waste and Grounds Strategic Manager
Tel:  01698 717748
Email:  Kirsty.McGuire@southlanarkshire.gov.uk 
82

Page 83

Appendix 1 – Statutory duties and responsibilities 
Climate Change (Scotland) Act 2009 and Flood Risk Management (Scotland) Act 2009
- councils must reduce emissions, adapt to climate impacts, and consider woodland’s role
in flood mitigation and natural flood management.  Woodland creation and management are
to support carbon capture, urban cooling, climate resilience, and natural flood mitigation.
Planning decisions must reflect these benefits.  National Planning Framework 4 Policy
requiring integration of climate adaptation and mitigation, including woodland design and
placement, into land use strategies. 
Planning (Scotland) Act 2019 - sustainable development is at the heart of the planning
system.  Councils must prepare a Forestry and Woodland Strategy that identifies
woodlands of high nature conservation value and set out proposals for their protection,
enhancement, and climate resilience.  The Act embeds sustainable woodland expansion
into the planning system, ensuring trees and woodlands contribute to biodiversity, climate
adaptation, and wider land-use benefits.  High Hedges (Scotland) Act 2013 – Duty to
consider complaints with powers to issue High Hedge Notices and enforce remedial
action/attend appeals. 
Town and Country Planning (Scotland) Act 1997 - Councils must retain, protect, and
plant appropriate trees within development to support sustainable green infrastructure.
Requires assessment of impacts on trees during development, enforcement of BS5837 tree
survey standards and actions, and the making and review of Tree Preservation Orders
(TPOs), Conservation Area Notifications and consultation on Felling notices.  A public
register of Conservation Area Notifications must be maintained.  Canopy cover is a key
element of biodiversity and place quality. 
Forestry and Land Management (Scotland) Act 2018 and Nature Conservation
(Scotland) Act 2004 - Duty to promote sustainable forest management and assess
woodland removal proposals and promote and further the conservation of biodiversity (e.g. 
Nature Networks).  Planning authorities exert a strong and increasing influence over future
woodland expansion, the control of woodland removal and the development of the forestry
industry in their areas.  They also have a duty to apply for Felling Notices as appropriate.
The Environmental Assessment (Scotland) Act 2005 also makes it a duty to secure the
carrying out of environmental assessment during the preparation of a qualifying woodland
plan or programs. 
Wildlife and Countryside Act 1981, as amended by the Nature Conservation (Scotland)
Act 2004.  Councils must manage invasive non-native species (INNS e.g. Rhododendron
ponticum) on their land.  Under wildlife legislation, Councils also have duties to protect
species such as birds, bats, and badgers, avoiding harm to individuals or habitats when
undertaking tree work. 
Health and safety at Work act 1974, Occupiers Liability (Scotland) Act 1960, and
Roads (Scotland) Act 1984 – Councils have a duty to take reasonable steps to manage
tree-related risks to employees, the public, and road users and structures.  This includes
target based systematic assessment and proportionate action to reduce foreseeable risks
from trees near paths, roads, and public spaces to an acceptable level. 
Where private trees pose a danger to road users, Councils may be required to act or
recover costs from landowners.  Public safety aspects should be addressed as part of the
approach to tree management. 
83

Page 84

Appendix 2 – Progress to Date 
• Tree estate
o Responsibility for 2.8 million trees, including 68,000 individual trees
o Current canopy cover targets for expansion set
o Assessments over 12-month period - 0.83 million trees
o Estimated 5,000 enquires per year 
• Strategic shift from reactive to proactive management
o Transition from complaint-led maintenance to risk-based, evidence-led 
o Trees recognised and managed as critical green infrastructure asset 
• Ash Dieback Disease 
o 95% of duty-impacting ash trees assessed
o Highest risk ash trees Council land managed 
o Delivery of Ash Dieback Action Plan 
o Long-term recovery planning aligned with biodiversity net gain 
• Storm resilience 
o £0.690 million reactive expenditure on tree works following major storms
(2023–2025)
o Developed emergency protocol and strengthening assessment regimes
o Improved workforce resilience and contractor frameworks 
• Digital transformation and asset management 
o Advanced Tree Asset Management system (Tree Plotter)
o Improving limited data on tree condition, demographics and risk
o Ability to quantify ecosystem services and asset value (individual trees)
o Integration of woodland plans 
• Urban Woodland Management Plans (UWMPs)
o Long term Plans for 927 ha of woodland being developed 
• Tree planting and canopy expansion
o 23,000 trees targeted along Nature Networks and CCF priorities
o 4 Pilot Community Tree Nurseries
o Development of a Tree planting pipeline
o Short term additional funding from charitable organisations and partners
o Tree Equity and CCF principles guiding planting in underserved communities 
• Community capacity building
o Partnerships with TCV, Trees for Cities, The Tree Council and Clyde Climate
Forest and community engagement.
o Volunteer Tree Wardens and Young Tree Champions
o Pilot Community Tree Nurseries in schools and Community Payback 
• Workforce development
o Assistant Arboriculture Officer appointed
o “Grow Our Own” programme delivering permanent arborists
o Investment in plant, machinery and staff training 
•  Tree Canopy Cover Strategy
o Developing overarching strategy to protect, enhance and expand canopy
o Alignment with Planning (Scotland) Act 2019 and climate/biodiversity duties
o Clear monitoring, stakeholder engagement and governance framework
84

Page 85

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Appointment of Public Analyst and Food Examiner 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval for the appointment of a Public Analyst and Food Examiner to
undertake the relevant statutory duties for the Council
[1purpose]
2. Recommendation
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the appointment of Jane Couper of Edinburgh Scientific Services be
approved to act on behalf of South Lanarkshire Council as Public Analyst and
Food Examiner.
[1recs]
3. Background
3.1. Amongst the duties and roles of South Lanarkshire’s Environmental Service there is
a need for Officers to assess a range of produce and goods such as food, water and
toys and have these items tested to ensure that they are safe and comply with
statutory standards. 
3.2. Chemical analysis can involve checking for the presence of lead in drinking water
which needs to be certified by a Public Analyst.  At the same time, microbiological
examination of foodstuffs for the presence of Salmonella needs to be certified by a
Food Examiner, while samples may be taken for a range of purposes, including the
investigation of suspected food poisoning outbreaks which may have been brought
to the attention of the Council from consumer complaints, routine surveillance or as
part of local or national surveys.   
3.3. Within this context and as required by the Local Government (Scotland) Acts,
Councils are required to appoint one or more Public Analysts to carry out duties under
the Food Safety Act 1990 within their area. 
3.4. There is no statutory requirement to appoint Food Examiners, but it is prudent to do
so, should the Local Authority be called upon in legal proceedings to confirm that a
Food Examiner was entitled to act of the Council’s behalf. 
4. Current Position and Proposal
4.1. The City of Edinburgh Council have been contracted to undertake analytical services
on behalf of South Lanarkshire Council since 2007.  This contract has been renewed
via competitive tender processes on several occasions since that time with the
current arrangement in place until June 2026.
10
85

Page 86

4.2. During this period, various suitably qualified individuals have been approved by this
Council to provide the formal role of Public Analyst / Food Examiner, with the most
recent appointment being Karen Maddison, who was appointed at the meeting of the
Community and Enterprise Resources Committee on 30 May 2023. 
4.3 However, it is recognised that there is a need to formally approve other personnel to
bolster capacity and provide resilience in the fulfilment of the roles of appointed
Public Analyst and Food Examiner for South Lanarkshire Council. 
4.4. Therefore, given the above it is proposed that the following individual is
appointed as Public Analyst and Food Examiner with immediate effect:- 
 Jane Couper B.Sc. (Hons), M.Chem.A., C.Chem., F.R.S.C. 
4.5. It is also confirmed that Jane Couper possesses a Mastership in Chemical
Analysis awarded by the Royal Society of Chemistry as required by
Regulation 4 of the Food Safety (Sampling and Qualifications) (Scotland)
Regulations 2013. 
5. Employee Implications
5.1. There are no employee implications contained within this report. 
6. Financial Implications
6.1. The appointment of Public Analysts and Food Examiners sits within the context of an
existing contract the Council has entered into with the City of Edinburgh Council to
provide scientific services.  The contract is due to end in June 2026 but at this time
there are no additional financial implications associated within this report. 
7.  Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
8. Integrated Impact Assessment and Consultation Requirements
8.1.     This report does not introduce a new policy, function or strategy nor recommend a 
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
24 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable 
86

Page 87

Previous References
 Community Resources Committee Report 12 June 2007
 Community Resources Committee Report 21 August 2007
 Community Resources Committee Report 22 May 2018
 Community Resources Committee Report 30 May 2023 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Karen Wardrope, Divisional Environmental Health Officer
E-mail:  Karen.wardrope@southlanarkshire.gov.uk
87

Page 88

88

Page 89

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Enabling Commercial Space Programme – Project
Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update Committee on South Lanarkshire’s projects in relation to the Enabling
Commercial Space Programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the progress in the delivery of the Enabling Commercial Space Programme
be noted.
[1recs]
3. Background
3.1. In February 2024, the Glasgow City Region (GCR) Cabinet agreed that an allocation
of £64.57M from the City Deal Infrastructure Fund, previously allocated for
improvements in connectivity to Glasgow Airport, be allocated towards a new,
regional project of significant scale, allowing the City Deal to support new
opportunities and priorities which have emerged since the initial Programme was
developed in 2013/2014. 
3.2. The GCR Cabinet also agreed that, as required by the City Deal Assurance
Framework, the Programme Prioritisation Framework (PPF) process be used to
identify the new regional project, with the identification of projects coming through an
Expression of Interest (EOI) process open to all Member Authorities (MAs).  This
process was to be carried out over a 12-week period from February to May 2024 but
was subsequently extended to September 2024 due to the General Election. 
3.3. At the conclusion of the process, the “Enabling Commercial Space Programme” EOI
was ranked highest based on:- 
 deliverability and financial risk being spread across eight local authorities, rather
than concentrated on one Member Authority
 the proposal addressing a Region-wide, significant need for commercial space
 delivering Region-wide Inclusive Growth with all MAs benefiting from investment
to deliver commercial space, thereby reducing potential displacement effects
from concentrating investment in one area of the Region
11
89

Page 90

4. The Enabling Commercial Space Programme
4.1. Throughout GCR, it has been identified that commercial and industrial stock is at or
approaching obsolescence.  This market failure requires intervention if the Regional
Economic Strategy’s challenges are to be addressed.  The delivery of new and
refurbishment of existing commercial space will contribute towards meeting current
demand for new industrial space within GCR, where there is a strong body of
evidence of structural challenges and market failure within the commercial property
market.  Enterprise and Sustainable Development Service has reported this
previously at a local level through the Employment Land and Property Market
Analysis Report presented to Community and Enterprise Resources Committee in
November 2024 and subsequently to all four Area Committees. 
4.2. The main investment objectives of the Enabling Commercial Space Programme are
to:- 
 address market failure in areas of GCR where there are particular barriers in the
development of new or refurbished commercial and industrial floorspace
 create flexible business space capable of meeting business requirements for a
broad range of sectors
 create serviced industrial land capable of immediate development
 create opportunities for employment and inclusive growth with particular
emphasis on making connections to local communities, schools and colleges in
preparation for employment, particularly in areas of deprivation and targeting
people drawn from disadvantaged or Protected Characteristic groups including
women and young people
 bringing sites on the Vacant and Derelict Land Register back into use
 attract mobile and private sector investment both from abroad and from
indigenous companies
 create sustainable, high quality business locations to support small and medium-
sized enterprises (SMEs), supply chain businesses and start-ups 
4.3. The programme of funding supports direct delivery of new commercial space, the
refurbishment of existing stock and the enabling of sites for new build construction. 
The interventions target market failure in the worst performing areas of GCR.  This
programme seeks to address a gap in the currently available public sector funding
and will focus on support for businesses more likely to be within the foundational
economy. 
4.4. The programme meets local demand, such as for general commercial space to
relieve pressures on constrained local markets and may offer particular benefit to
SME businesses and startups that will struggle to fund being sited in appropriate
commercial space, and potentially businesses supporting wider supply chains and
other high value commercial uses. 
4.5. The first steps undertaken by all MAs was to identify a long list of projects that meet
the criteria of the Programme.  Each of these projects was submitted to GCR as an
EOI in September 2024.  This long list allowed the Strategic Business Case to be
developed and was approved by the GCR Cabinet in February 2025. 
4.6. In South Lanarkshire’s case, an extensive piece of work was undertaken to identify
appropriate projects that maximise the economic outputs within the area and have
the potential to lever in further investment from partners.  These projects supported
the findings of the Ryden Property Analysis Report previously reported to
Community and Enterprise Resources Committee.  
90

Page 91

4.7. On the basis of the Council’s submission, GCR Cabinet approved an allocation of
£11,075,919 from the overall programme to South Lanarkshire.  On further
assessment of the Council’s long list of potential projects, three Priority Projects
were identified for delivery.  In each case, Full Business Cases (FBCs) require to be
approved by both the Council and the GCR Cabinet.  The three projects are Red
Tree Labs, Shawfield, Industrial Unit Upgrade and Retrofit, and Cathcart Road,
Rutherglen. 
5.  Progress to Date 
Red Tree Labs
5.1.  The Red Tree Labs project will be the second building on the Shawfield Phase
1/Magenta site and will deliver a highly flexible commercial laboratory incubator and
office space suitable for a variety of end users in Shawfield and capable of attracting
science-based businesses and jobs to the Glasgow City Region and Scotland.  The
project aims to deliver a high specification building which will support innovation and
collaboration through a blended provision of flexible and agile laboratory space,
associated office and incubator-related services. 
5.2. The project will be impactful as a visibly new four storey building and will form an
integral component of the wider Clyde Gateway Innovation proposition and
comprises 4,730 sq. m Gross Internal Area (GIA) of accommodation over four floors,
1000 sq. m more than initially proposed, acting as a further catalyst for the
regeneration of Shawfield.   
5.3. A full design team is in place which has recently concluded the design to RIBA Stage
3.  Planning consent has already been approved.  Specialist advice has also been
sought in respect of ‘stress testing’ the design in what is a specialist market.  For a
number of reasons and to maximise outputs from the investment, including some
layout changes to maximise flexibility within the building, the programme has been
recalibrated and RIBA Stage 4 design will now be progressed during Spring 2026
rather than summer 2025 as previously detailed.  This will be followed by a
contractor tender exercise with a site start targeted for early 2027.  A 60-week
construction programme from January 2027 will allow completion late Quarter 1
2028, well in advance of the 2030 expenditure deadline set out in the Enabled
Business Space Programme.   
5.4. The delay to the programme also potentially allows the project to lever additional
funding through the Regeneration Capital Grant Fund (RCGF) and the Local
Innovation Partnership Fund (LIPF).  If these applications are successful, the
additional funding will enable full fitout of the ground floor area, including additional
funding being made available to offset any potential tenant shortfall.  Clyde Gateway
is well placed to deliver the building and has the governance and experience to do
so.   
5.5. The project cost was previously identified at £17.4M.  Due to inflation, an improved
specification and larger development the cost is now estimated at £22.56M  The
indicative funding proposed is Regeneration Capital Grant Fund (RCGF) £1M, Local
Innovation Partnership Fund (LIPF) £3M, Vacant Derelict Grant Fund (VDLF) £0.1M,
Clyde Gateway £3.5M, Scottish Enterprise £6.0M, GCR (via SLC) £9.0M.  Funding
will be confirmed by partners prior to the submission of the Full Business Case
(FBC) for approval. The South Lanarkshire Council contribution of £9.0M is
unchanged with leverage on completion increasing by £5.16M. 
91

Page 92

Industrial Unit Upgrade and Retrofit
5.6. A report, “Response to Industrial Market Challenges” was approved by Executive
Committee on 4 February 2026 which identified a series of actions and interventions
to address a shortage of industrial property available for rent and the quality of
existing stock through the refurbishment of existing property, creation of serviced
plots and units and provision of grants to incentivise property upgrade. 
5.7. The Industrial Unit Upgrade and Retrofit project identified in the Council’s Enabling
Business Space programme complements and supports proposals in the report and
work is underway to identify a suitable property project for investment of the
£963,000.  Potentially the first phase of a wider programme.  On identification the
specific Industrial Unit Upgrade and Retrofit Project will require to be approved by
GCR via the standard change control process. 
Cathcart Road Industrial Units
5.8. The Cathcart Road Net Zero Industrial Units will create two units totalling 620 sqm
and providing the opportunity to support 13 jobs on completion.  This project
responds directly to the Employment Land and Property Market Analysis undertaken
by Ryden which stated that to address the shortage of good quality industrial stock,
the Council should look to intervene in the market to ensure new supply.  As
reported to Community and Enterprise Committee on 16 December 2025 this project
will be complete and ready for occupation during late Autumn of 2026.  Due to
securing a cocktail of funding, the final funding package does not require the
£1,112,919 GCR allocation and it is proposed that this funding, and subject to
appropriate approvals, will support the delivery of a similar project on another site
and kickstart the activity identified in the “Response to Industrial Market Challenges”
Report. 
5.9. As projects develop Full Business Cases will be presented for approval by
Committee.   
6. Employee Implications
6.1. The Red Tree Labs project will be delivered by Clyde Gateway supported and
monitored by Council officers.  Other activity including Response to Industrial Market
Challenges and Industrial Unit Upgrade and Retrofit projects will be delivered by
officers from the Enterprise and Sustainable Development Service within Community
and Enterprise Resources. 
7. Financial Implications
7.1. The costs for the Council in developing its projects will be met by the GCR
programme, and up to 6% of the project costs are available for further project
development and FBC preparation.  Other external funding sources will continue to
be investigated to further support and enhance the programme. 
7.2. The project aligns with the Supporting and Development Local Business Investment
within the approved 2026/2027 budget. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The report was prepared having regard to the existing and emerging best practice
around climate change and sustainability.  It is intended to complement and comply
with the Council’s and wider communities’ aspirations in the area.
92

Page 93

9. Other Implications
9.1. Not identifying priority projects that can be delivered by 2030 risks the loss of this
additional GCR investment.  The performance of this sector has a significant impact
on the local economy and employment opportunities. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Integrated Impact
Assessment is required. 
10.2. Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in
employment land and property within South Lanarkshire.  This consultation and co-
operation will continue throughout the duration of the initiative. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
13 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 Response to Industrial Market Challenges – Executive Committee, 4 February 2026
 Cathcart Road Net Zero Industrial Development – Community and Enterprise
Committee, 16 December 2025 
 2025/2026 Capital programme Update - South Lanarkshire Council, 26th February
2025
 Employment Land and Property Market Analysis Report – Community and Enterprise
Committee, 26 November 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
John Archibald, Project Development Officer
Enterprise and Sustainable Development Services
E-mail: john.archibald@southlanarkshire.gov.uk 
93

Page 94

94

Page 95

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Clyde Wind Farm South Lanarkshire - Net Zero
Community Grant Fund 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 inform members of plans to formally launch the Clyde Wind Farm South
Lanarkshire Net Zero Community Grant Fund
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the plans for the Clyde Wind Farm South Lanarkshire Net Zero Community
Grant Fund, as detailed in this report, be noted. 
3. Background
3.1. A key priority of the Council’s Sustainable Development and Climate Change
Strategy (2022 to 2027) is to ‘empower communities to take climate action and be
more environmentally sustainable’.  To facilitate this, the Council launched a climate
emergency community grants scheme in January 2022, awarding £340,000 to 108
community climate projects over a 3-year period.  The grants scheme was funded by
a combination of internal Council funding and UK Shared Prosperity Funding and
awarded grants to a range of projects from January 2022 to March 2025.  Although
the grants scheme is now closed due to lack of available funding, community groups
continue to show a strong interest in this type of support. 
3.2. The SSE Clyde Wind Farm Fund has been operating since 2009 with an annual
income of £1,387,428 in 2024/2025.  The Fund is administered by the Council on
behalf of SSE.  The legal agreement with SSE divides the Fund into 70% for the
local Community Fund which is reported within the annual Community Benefits
report and 30% to the Development Fund. 
3.3. The Development Fund has been established to support both local and South
Lanarkshire Council wide initiatives with the following key objectives:- 
 improve and develop local and national supply chains in respect of windfarms
 improve and develop renewable energy, recycling and environmentally
sustainable industries, businesses and activities.  Secure investment, create
employment, implement training, promote or secure sustainable development
 advance education and employability
12
95

Page 96

3.4. The Development Fund currently funds the RISE employability programme across
South Lanarkshire to the sum of £200,000 per year and this will continue.  With the
income to the Development Fund now at £416,000 per year, officers have discussed
with SSE proposals to use the Development Fund to introduce a new Net Zero
Community Grant Programme within South Lanarkshire. 
4. Proposed Grants Programme
4.1. SSE Renewables and the Council have entered into an agreement on the allocation
of £450,000 from the Development Fund to a new Council community grant
programme operating over a three-year period.  The funding will not be tied to
specific financial years; it will be distributed as demand requires to allow flexibility for
applicants and ensure the best possible projects.  The Council programme will be
named and promoted as the Clyde Wind Farm South Lanarkshire Net Zero
Community Grant Fund. 
4.2. The Clyde Wind Farm South Lanarkshire Net Zero Community Grant Fund will be a
medium sized net zero grant programme supporting community organisations across
South Lanarkshire in delivering locally led climate action and adaptation projects and
helping South Lanarkshire achieve a just transition to net zero.  Grants will be
available on a competitive basis, ranging from £5,000 to £20,000.  Applications
within this range can receive up to 100% grant funding with no requirement for match
funding.  Larger applications of over £20,000 will be considered based on merit and
need, with awards capped at 70% of the project cost and the requirement for match
funding. 
4.3. Grant awards can be made for environmental, sustainability and climate change
projects, including energy efficiency, energy generation, renewable energy, start-up
costs, special projects, and equipment.  Projects must embrace the Council’s climate
change, sustainability, and climate adaptation objectives:- 
 improved energy efficiency
 the use of renewable technology
 reduction in the reliance of fossil fuels
 increased renewable energy generation
 improved air quality
 increased climate resilience
 improved resource efficiency
 increased active travel opportunities
 increased/enhanced urban greenspace
 improved outdoor access
 reduction in waste
 supporting the circular economy
 adapting to climate change
4.4. Eligible organisations must be not-for-profit, have a constitution and a bank account
and aim to benefit South Lanarkshire residents.  The Fund will be available South
Lanarkshire wide.  The Fund will aim to compliment local and national funds and can
be used as match funding for other grants where match is required. 
96

Page 97

4.5. Community groups will apply for the grants through the existing Grantvisor
Community Grants portal.  All applications will undergo an initial enquiry stage,
screening to ensure compliance with the funding criteria.  Project development and
applicant support will be provided by Lanarkshire Climate Action Hub where needed. 
The grant programme will operate in line with the South Lanarkshire Grant Policy
and Third Sector Fair Funding Agreement.  Grants of less than £20,000 will be
approved under delegated authority, while grants of over £20,000 will be submitted
to this Committee for approval.  Application appraisal will be carried out by a
specialist panel consisting of a South Lanarkshire Council Manager, a Lanarkshire
Climate Hub Lead Officer and a VasLan Lead Officer. 
4.6. The impact of the programme will be assessed and reported annually to SSE and
this Committee.  The success of the programme will be assessed after three years,
with an option to continue and increase funding at the end of three years if deemed a
success by both the Council and SSE. 
5. Next Steps
5.1. The promotion of the grants programme will be advertised through the Council’s
website and social media channels, emails to community groups, community
councils, and with the help of community partners.  The programme will launch in
summer 2026. 
6. Employee Implications
6.1. The new grant programme will be managed using existing Enterprise and
Sustainable Development Service staff. 
6.2. Project support will be delivered through the Lanarkshire Climate Hub.  The
Enterprise and Sustainable Development Service will continue to engage with
Climate Hub and other local groups to ensure that communities across South
Lanarkshire are provided with support to realise their ambitions to address the
climate emergency. 
7. Financial Implications
7.1. There are no additional financial implications for the Council managing the proposed
new fund. 
8. Climate Change, Sustainability and Environmental Implications
8.1. ‘The environment and net zero sustainability’ is one of the seven priorities for the
Community Benefit Fund agreed by the Community and Enterprise Resources
Committee at its meeting held on 6 February 2024.  The Clyde Wind Farm South
Lanarkshire Net Zero Grant Community Grant Fund will support this priority. 
9. Other Implications
9.1. Failure to meet sustainable development and climate change objectives’ is one of
the top risks for the council.  The proposed grant programme will support community
net zero and climate change projects. 
9.2. The funds will also assist in delivering the Community Wealth Building aims, in areas
such as retaining wealth locally and community ownership. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated
impact assessment is required.
97

Page 98

10.2. Consultation has been undertaken with relevant Council Resources and external
organisations associated with the establishment of this Fund. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
11 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee, 6 February 2024, Renewable
Energy Fund 
 Climate Change and Sustainability Committee Report, 4 June 2025, Full Term Report
on the Climate Emergency Fund (2021-25) 
List of Background Papers
 Sustainable Development and Climate Change Strategy 2022-2027
 UN’s Sustainable Development Goals 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kathryn McCafferty, Carbon Management Officer 
E-mail:  kathryn.mccafferty@southlanarkshire.gov.uk 
98

Page 99

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Douglas Valley Community-Led Outdoor Recreation
and Adventure Tourism Project 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide Committee with an overview of the Douglas Valley Community-led
Outdoor Recreation and Adventure Tourism Project
 provide and update on progress and next steps
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the progress being made to deliver the Douglas Valley Outdoor
Recreation and Adventure Tourism Project be noted.
[1recs]
3. Background
3.1. Constituted in 2023, the Douglas Valley Advisory Group (DVAG) represents the six
communities surrounding the Hagshaw Energy Cluster - Coalburn, Douglas, Glespin,
Lesmahagow, Muirkirk and Rigside and Douglas Water.  Each settlement is
represented by a community council representative plus an individual representative
selected by the community councils by application. 
3.2. DVAG advises the Council on the investment of funds that further the delivery of key
priorities as outlined in the Hagshaw Energy Cluster Development Framework,
adopted by East Ayrshire Council and South Lanarkshire Council Planning
Authorities in October 2022 as supplementary planning guidance. 
3.3. The Development Framework outlines six key themes relating to the proposed
sustainable development of the Hagshaw Energy Cluster and surrounds as follows:- 
 Realising the Renewable Energy Opportunity
 Resilient and Connected Communities
 Coordinated Enhancement of Nature
 A Strong Identity, of Heritage, People and Place
 Inclusive, Sustainable Growth
 Outdoor Recreation to Support Health and Wellbeing 
13
99

Page 100

3.4. The Outdoor Recreation and Adventure Tourism (ORAT) project, to support the
Health and Wellbeing theme, is the first to be progressed by the Council on behalf of
DVAG. 
3.5.  The project was funded by UK Shared Prosperity Fund, and following procurement
was delivered by Land Use Consultants (LUC) and managed by Economic
Development Officer: Douglas Valley Initiative. 
4. Progress to date
4.1. The ORAT includes a vision statement as follows: Douglas Valley will be a well-
connected place that offers a multitude of recreational activities.  This will improve
the quality of life of local communities through the provision of health and wellbeing
benefits.  Associated educational, employment and business opportunities will help
to address the legacy of post-industrial decline.  Douglas Valley will become a well-
known, distinctive and accessible destination for recreational activities and adventure
sports with a clear ‘wow factor’ that attracts 100,000 visitors per year.  Visitors will
come from the Central Belt and the South of Scotland, as well as the North of
England. 
4.2. The project sets out the context for phased development of proposals with an
estimated capital cost of £14.5M over the next 10-15 years, with construction activity
supporting the regional and national economy.  Split into 26 key developments, the
project is anticipated to be largely delivered by local community organisations
utilising regional and national grant funding sources matched with community benefit
funds including Renewable Energy Fund. 
4.3. The economic appraisal of the proposals project possible visitor numbers of 100,000
per annum within 15 years, worth millions in numerous benefits, including impact in
daily operations and tourism worth £2.6M Gross Value Added (GVA) to the South
Lanarkshire economy, supporting 100 jobs and £3.3M GVA and 110 jobs across
Scotland. 
4.4. Proposals comprise three main elements:- 
 A network of recreational and community hubs (Douglasdale Community
Woodland, Coalburn, Douglas and Glespin), and associated access points
(Glenbuck, Mainshill and Poneil).
 Recreational activity proposals including strategic recreational walking and
cycling routes, bike skills track (Coalburn Bing) and mountain bike trail centre
(Douglas West), alongside wayfinding, interpretation and natural play features
(throughout).
 Active travel routes between settlements and connecting to Douglas West,
including those already completed Coalburn – NCN74 and Coalburn – Douglas
by Community Action Lanarkshire and part funded by the Renewable Energy
Fund in 2024/2025. 
4.5. The project methodology comprised of eight key stages; Inception and Baseline
Analysis; Market Assessment; Site Appraisals and Landowner Engagement;
Feasibility Studies, Project Scope and Definition; Consultation; Preparation of Project
Brief; Economic Appraisal; and Project Outputs and Reporting.
100

Page 101

4.6. Comprehensive consultation played a key role in shaping proposals.  It included six
community drop-in workshops, an online survey, six primary school workshops and
landowner and stakeholder consultation and presentation.  Broad support and
widespread enthusiasm for the proposals was identified throughout the process with
key issues highlighted to be addressed during the next stages of design
development. 
5.  Next Steps
5.1. Delivery of proposals is presented as a three-phase process: Phase 1 (Years 1-3),
Phase 2 (Years 2-5) and Phase 3 (Years 7+), with a variety of delivery partners
identified. 
5.2. Phase 1 includes:- 
 Douglasdale Community Woodland Hub – Workshop Building
 Douglas West Temporary Visitor Facilities and Car Park
 Active travel connection from Poneil to Douglas West
 Overall Branding and Signage Strategy
 Local Visitor Infrastructure Enhancement in and around Coalburn
 Dalquhandy Recreational Enhancements and Coalburn Connections
 Online Map of Recreational Walking and Cycling Routes 
5.3. Douglasdale Community Woodland Hub – Workshop Building and Douglas West
Temporary Visitor Facilities and Car Park will be progressed by Douglasdale REAL
Group, supported by Economic Development Officer: Douglas Valley Initiative and
the Douglas and Glespin Community Development Worker.  Funding applications
have been submitted to Renewable Energy Fund and Clyde Wind Farm Fund for the
delivery of the projects to RIBA Stage 2 with timelines for completion to be discussed
upon contract award. 
5.4. Active travel connection from Poneil to Douglas West has partly been completed by
SP Energy Networks upon the laying of an underground cable along the route of the
path and former railway track in the Douglasdale Community Woodland.  It is
anticipated that the remaining section of path will be upgraded similarly for the
remaining section of path, but timelines remain to be confirmed at this time. 
5.5. Economic Development Officer: Douglas Valley Initiative will progress the remaining
projects of Phase 1 upon direction from DVAG, including securing funding,
procurement and project management.  This includes overall Branding and Signage
Strategy, Local Visitor Infrastructure Enhancement in and around Coalburn,
Dalquhandy Recreational Enhancements and Coalburn Connections and the Online
Map.  Timelines will be developed in due course. 
6.  Employee Implications
6.1. Economic Development Officer: Douglas Valley Initiative supports the delivery of the
Hagshaw Energy Cluster Development Framework, funded by the Douglas West
Wind Farm.  The officer will continue to support the delivery of the above projects,
identifying funding, providing procurement and project management support on
behalf of DVAG.  They will also liaise with the Douglasdale REAL Group on the
development of the Community Woodland.
101

Page 102

7. Financial Implications
7.1. All projects will be externally funded including from the Renewable Energy Fund with
the aim to secure additional regional and national funds which have no financial
implications for the Council.  Business cases including revenue implications will be
developed through all stages of delivery to ensure a sustainable business model is
delivered. 
8. Climate Change, Sustainability and Environmental Implications
8.1. As they are developed, proposals will align with principles underpinning the
Hagshaw Energy Cluster Development Framework relating to climate change,
sustainability and environment.  These include the UN 17 Sustainable Development
Goals (SDGs) that recognise that ending poverty and other deprivations must go
hand in hand with strategies to improve health and education, reduce inequality, and
spur economic growth – all whilst tackling the global climate and biodiversity crises. 
9. Equality Impact Assessment and Consultation Requirements
9.1. Equality Impact Assessments will be undertaken as individual projects are
developed. 
9.2. Extensive consultation has been carried out as set out in paragraph 4.6 which will
continue as the projects are developed.   
Kevin Carr
Executive Director (Community and Enterprise Resources) 
17 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resource Committee - 29 August 2023 - The Hagshaw
Energy Cluster Development Framework 
 Planning Committee - 11 October 2022 – South Lanarkshire Local Development Plan
2 Supporting Planning Guidance : Hagshaw Energy Cluster Development Framework 
102

Page 103

List of Background Papers
 Douglas Valley Community-led Outdoor Recreation and Adventure Toursiim Feasibility
Study and Concept Design December 2025
 A Development Framework for the Hagshaw Energy Cluster July 2023
 A Development Framework for the Hagshaw Energy Cluster Consultative Draft
October 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Sarah O’Sullivan, Economic Development Officer
Tel: 07795 453825
E-mail:  sarah.o’sullivan@southlanarkshire.gov.uk 
103

Page 104

104

Page 105

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Clydesdale Way – Project Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on the UK Government funded Clydesdale Way project
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that progress with the delivery of the Clydesdale Way project be noted.
[1recs]
3. Background
3.1. In 2021/2022, South Lanarkshire Council worked in partnership with Scottish
Borders (SBC) and Dumfries and Galloway Councils (DGC) to develop a joint bid for
Round 2 of the UK Levelling Up Fund (LUF) targeting the Dumfriesshire, Clydesdale,
and Tweeddale constituency.  The joint ‘Three Rivers Active Tourism Project’ was
focussed on promoting tourism, providing significant community benefits, and
improving culture and rural economies.  The bid comprised of three projects, one
from each of the three local authorities.  At that time the Round 2 bid was
unsuccessful.   
3.2. South Lanarkshire’s project has focused on the rural path and cycling network
through the development of the Clydesdale Way to address the gaps in the regional
paths network, create investment in infrastructure to develop tourism in the area and
establish active travel links between local communities. 
4. Project Funding
4.1. Round 3 of LUF drew on bids which were unsuccessful in Round 2 but had been
assessed as ‘high quality and ready to deliver’.  Consequently, on 20 November
2023, the UK Government advised the Three Rivers Active Tourism Project had
been awarded £22,809,416.  The three Councils are contributing £2,534,380 in
match funding bringing the total cost to £25,343,796. 
4.2. The LUF grant is broken down as follows:- 
 Clydesdale Way (South Lanarkshire): LUF grant awarded £6,795,000 with
match funding by the Council of £755,000 giving a total project value of
£7,550,000.
14
105

Page 106

 The Chambers Institution (Scottish Borders): LUF grant awarded £4,195,800
to convert an A-listed Council building in Peebles to accommodate an integrated
museum, library, art gallery, and flexible event space. 
 Annan Harbour (Dumfries and Galloway): LUF grant awarded £13,131,796 to
refurbish Colette’s Building, a vacant warehouse into a community hub; including
public realm improvements to the surrounding harbourside, and construction of a
new footbridge. 
4.3. Funding was awarded to Dumfries and Galloway Council, as lead applicant for the
project, and a Grant Funding Agreement was developed with the Council to ensure
funding was in place prior to the appointment of external consultants and
professional advisors. 
4.4. LUF criteria originally specified that grant funding should be incurred by March 2026,
however, updated guidance from the UK Government has since extended delivery to 
March 2028.  The Council’s project will be delivered to meet this timescale.   
5.  Project Description 
5.1. The proposed route commences at the end of the Clyde Walkway at Bonnington
Lynn.  From Wolfclyde at Biggar the route will travel towards the John Buchan Way
at Broughton in the Scottish Borders and continue south past Coulter, Abington,
Crawford, Elvanfoot and Leadhills to join the Southern Upland Way in Wanlockhead
in Dumfries and Galloway (See Appendix 1 outlining the overall route).   
5.2. The current proposed Clydesdale Way is approximately 132km in total.  There are
high level routes which pass through hilly and exposed terrain and low-level routes
that follow the river corridors.  The availability of both high and low-level routes
create loops that provide more diverse options and increase the appeal to a wider
range of users. 
5.3. The project is split up into 22 individual sections which compromise new and existing
paths.  The project has been developed by creating a connected route through a
mixture of unclassified roads, existing tracks and new paths.  New paths will be a
mixture of unbound paths (e.g. whin dust) and bound paths (e.g. tarmac). 
Accessibility along the routes will be limited in sections due to gradient and terrain. 
To deliver the project, over 100 landowner agreements will be required. 
6. Procurement 
6.1. Following a procurement exercise and on conclusion of the Grant Funding
Agreement with Dumfries and Galloway Council, Turner and Townsend Project
Management was appointed as lead consultant with Stantec appointed as
subcontractor leading on landowner engagement, consultation, branding, marketing,
environmental considerations, active travel and infrastructure. 
7. Project Governance
7.1. A Project Board has been established with the Executive Director and Heads of
Service within Community and Enterprise Resources, and the Head of
Administration and Legal Services and Head of Finance (Strategy) which meets at
key stages in the project. 
7.2. A Project Team involving officers across the relevant services within the Council e.g.
Countryside and Access, Legal, Roads, Planning and Enterprise and Sustainable
Development Teams, has also been set up and meets on a regular basis. 
106

Page 107

8. Project Update
8.1. Following appointment of the external team, the project has moved at pace with the
activities below completed:- 
 initial consultation was carried out with local councillors, community councils
and key stakeholder groups in Autumn 2025
 landowner engagement – a protocol for engagement has been agreed between
Stantec and the Council.  55 landowners have been contacted with 34 actively
engaging with the project.  A RAG (Red/Amber/Green) status action tracker has
been prepared to record and summarise contact with landowners
 audit and report on user experience and special needs audit completed
 ecological walkover and report completed
 RIBA Stage 3 design of routes completed
 Blue Sail Consultants haven been appointed to develop project marketing,
branding and signage 
8.2. Following lengthy discussions with landowners it has been identified that landowner
agreement will not be forthcoming for several sections of the project.  This was
discussed at a special Project Board meeting on 5 February 2026 where it was
agreed to halt landowner discussions on the following routes and identify alternative
routes:- 
 Route 8 (Lamington to Wandel) is under review to identify an appropriate
alternative route to avoid crossing A702
 Route 27 (Thankerton to Symington) is under review to identify an appropriate
alternative route on existing country roads and core paths
 Route 28 (Symington to Wolfclyde) has now been removed from the project due
to landowner negotiations failing 
9.  Next Steps/Timeline 
9.1. The following sets out key milestones for the next year:- 
TASK MILESTONE
Procurement Strategy Underway
Conclude community consultations Spring 2026
Develop marketing / branding  Spring 2026
Landowner agreements finalised Summer 2026
Conclude technical design  Summer / Autumn 2026
Conclusion of procurement of
contractor/contract award  
Autumn 2026
Site start Autumn/ Winter 2026
Completion of full project  Autumn 2028 
10. Employee Implications
10.1. The project is being managed by officers from Enterprise and Sustainable
Development Service, with input from colleagues in various services across the
Council.  The internal team is supported by external project managers and
designers.   
11. Financial Implications
11.1. As outlined in paragraph 4.2, the Council has received an LUF grant award of
£6,795,000 and with the Council’s match funding of £755,000 gives a total project
value of £7,550,000.
107

Page 108

11.2. As the grant award was part of a joint bid, with Dumfries and Galloway Council as
lead authority, the Council submits quarterly claims to Dumfries and Galloway
Council to drawn down the funds. South Lanarkshire Council is also required to
complete monthly monitoring reports. 
12. Other Implications
12.1. A full Risk Register has been developed by Turner and Townsend and will be
monitored and updated throughout the project.  The current top risks relate to
landowner agreements/consent, cost pressures, and flood risk of certain sections of
the route.   
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. All necessary environmental
considerations will be taken into account and managed accordingly as the project
progresses. 
14. Integrated Impact Assessment and Consultation Requirements
14.1. An Integrated Impact Assessment is currently being developed.   
14.2. Public and stakeholder consultation will continue to be undertaken throughout the
project.  Online consultation is scheduled for Spring 2026, with in-person
consultation scheduled to take place at the Council’s Rural Conference in Biggar at
the end of March 2026. 
Kevin Carr
Executive Director ( Community and Enterprise Resources) 
17 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
108

Page 109

Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Judith Gibb, Change and Development Adviser
E-mail:  judith.gibb@southlanarkshire.gov.uk 
109

Page 110

Appendix 1 Overall Map of Route (dependent on landowner consents) 
110

Page 111

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Business Gateway Lanarkshire – 2025/2026 Interim
Performance Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an overview of the activities and performance achieved up to the end
of Quarter 3 2025/2026 by the Business Gateway Lanarkshire service
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the services being delivered, be noted.
(2) that the performance achieved to date, be noted.
[1recs]
3. Background
3.1. Business Gateway is a nationally branded service which is delivered by individual
local authorities to provide free, impartial advice and support to pre-start, new start
and existing businesses. 
3.2. Business Gateway has the following core service objectives:- 
 support more people with their ambitions to start a business
 support more businesses to survive and achieve their growth ambitions
 support more people with their aspirations for high business growth
 support more people from under-represented groups to access mainstream
business support 
3.3. Underpinning the service objectives, there is a commitment to providing support
across several themes such as Carbon Reduction, Fair Work, Innovation,
Internationalisation, Digital Upskilling, Community Wealth Building, and Job Creation.
In addition, local authorities have the flexibility to tailor services to address specific
local needs and priorities. 
3.4. The service was insourced with effect from 1 March 2024 with North Lanarkshire
Council delivering the service on behalf of both Councils.  North Lanarkshire Council
has managed the delivery of Business Gateway Services on behalf of both North
and South Lanarkshire Councils since 1 April 2008.  Between April 2008 and
February 2024, the service was delivered through a series of outsourced contracts.
15
111

Page 112

3.5. Although the advisers and administrative staff for the in-house model are employees
of North Lanarkshire Council, Business Gateway Lanarkshire is managed via
quarterly Steering Group meetings where South Lanarkshire Council is represented
by our Head of Enterprise and Sustainable Development, Economic Development
Manager and Business Support Team Leader.  The Council is also represented on
interview panels for the recruitment of new/replacement Business Gateway Staff. 
Business Gateway Lanarkshire is South Lanarkshire Council’s primary provider of
face-to-face business support to the small and medium-sized enterprise (SME)
business base. 
4. Performance 
Enquiries
4.1. Clients typically access the Business Gateway Lanarkshire (BGL) service through
making an initial enquiry via one of several different channels, as follows: 
 BGL Web Site
 Planning to Start Review
 Strengthen Your Business Review
 Digital Health check 
 Enquiry Fulfilment and Research Service
 Telephone
 E-mail
 Social Media 
 Local Contact
 Telephone
 E-mail
 Social Media
 Client Referral
 Partner Referral 
4.2. Typically, BGL receives 1,500 enquiries per year from South Lanarkshire based
businesses or individuals, of which 1,000 relate to Pre-Start/New Start businesses
with the balance of 500 being from established businesses. 
4.3. 2025/2026 performance to date:- 
Service Q1 Q2 Q3 Total Target % to Target
Total Enquiries 372 373 275 1020 1500 68.0%
Pre/New Start 256 289 171 716 1000 71.6%
Existing Business 116 102 104 322 500 64.4% 
4.4. Total enquiries from April to December 2025 have increased by 58, compared to the
same period in 2024 and driven by Prestart/New Business enquiries.  September
remains the best performing month securing 143 enquiries which was promoted as
the Business Gateway National “Start Up” month and heavily promoted at a local
level across Lanarkshire. 
4.5. The proportion of Pre-start/New business to Existing business enquiries is in line with
the expected ratio of 3/2, but it is noted that the established business enquiries
continue to decline, which is also a national trend.  
112

Page 113

4.6. The latest figures highlight the ongoing uncertainty facing Scotland’s SME base, with
confidence remaining fragile and growth continuing to weaken.  A combination of
structural pressures and wider economic headwinds is constraining performance
across the sector.  Key contributing factors include:- 
 rising input, energy, and operational costs
 weak consumer demand and slowing economic momentum
 global instability and international trade disruptions
 inflation-driven wage and cost pressures
 persistent supply chain challenges and ongoing post-Brexit adjustments 
In addition to these broad economic pressures, several sectors are experiencing
more acute, industry-specific challenges, including:- 
 manufacturing sector decline:-
 manufacturing output in Scotland fell significantly in early 2025
 broad‑based downturn across subsectors including food and drink
production
 closure of Grangemouth oil refining operations reduced industrial activity
and demand across supply chains 
 food and drink sector pressures:-
 output declines affected producers and linked SMEs in agriculture,
packaging, logistics, and catering 
 hospitality sector strain:-
 falling employee numbers and reduced staffing due to softer demand and
rising operating costs
 higher utility and input costs placing pressure on margins for small
hospitality businesses 
 export‑exposed sector challenges:-
 many exporters reported lower export volumes due to weaker international
demand and trade frictions
 import‑reliant SMEs faced higher import costs, affecting profitability 
 retail and consumer‑facing sector pressures:-
 declining customer spends impacting sales volumes
 growing price sensitivity and increased competition squeezing margins 
 energy and petroleum supply chain disruption:-
 shutdown of Grangemouth refining impacted SMEs in engineering,
maintenance, logistics, and environmental services 
4.7. Recent government policy changes have further influenced SME confidence and
future growth intentions.  Adjustments to taxation, labour regulation, and employment
legislation have introduced increased cost pressures and heightened planning
uncertainty for many small and medium-sized enterprises.  Notable policy-related
impacts include:-
113

Page 114

 increases in labour costs (National Insurance, National Real/Living Wage)
 higher tax burdens and reduced reliefs (Capital Gains Tax, business rates)
 more complex employment regulations (Employment Rights Bill; predictable
work patterns legislation)
 policy instability and uncertainty
 longer-term tax reforms creating planning uncertainty (pension National
Insurance contributions (NICs) changes) 
Business Start Up Service
4.8. Prior to being allocated a dedicated Business Gateway Adviser, clients at the pre-
start stage are encouraged to complete a “Planning to Start” review which provides
an overview of the stage they are at on their start up journey.  This enables the
adviser to have a more meaningful initial interaction with the client and for an
individually tailored action plan to be produced.  It also allows the adviser to identify
potential early-stage growth businesses and classify them as pre-start plus, enabling
more intensive support to be provided. 
4.9. Once a pre-start client commences trading, the business is classified as either a New
Business or, if it has growth potential, as New Business Plus, with ongoing support
being provided during the first 12 months of trading. 
4.10. Business Start Up 2025/2026 performance to date:- 
Service Q1 Q2 Q3 Total Target % to Target
New Business Starts 62 76 62 200 375 53.3%
New Business Plus Starts 13 11 8 32 100 32.0% 
4.11. New Business starts are ahead of the same period last year by 34.  The conversion
ratio has increased from 1:4 to 1:3. 
4.12.  Of the customers who were supported to start a business in South Lanarkshire; 115
were female-led enterprises, 13 were from minority ethnic backgrounds, 20 were
established by young people aged under 25, and 12 customers reported having a
disability.  The service will continue to identify and develop effective pathways to
increase engagement with under-represented groups.  This will include strengthened
partnership working with local authorities and key delivery partners, including The
King’s Trust, the Department for Work and Pensions (DWP), and Routes to Work
(North and South). 
4.13. External factors impacting on people wishing to consider self-employment include
economic uncertainty and rising business costs as well as declining interest in
entrepreneurship among younger adults.  This second point is something that the
Council is attempting to address via the South Lanarkshire Council Sharkreef
initiative. 
Existing Business Services
4.14. Businesses which have been trading for more than 12 months are regarded as an
existing business and are classified in one of the following three ways:- 
 business base – any business that does not satisfy the criteria (noted below) or
does not require intensive adviser support
114

Page 115

 local priority – a business that needs assistance to survive or achieve modest
growth and which satisfies local priority criteria set out below:- 
 increase the reach of BGL across all communities including a renewed
focus and take-up of services from residents from rural communities and
priority Scottish Index of Multiple Deprivation (SIMD) areas
 increase take-up of BGL services from under-represented groups including
long-term unemployed, economically inactive residents, carers, young
people, Black, Asian and Minority Ethnic (BAME), disabled people,
restorative justice/offenders
 increase focus and take-up of BGL services from Social Enterprises,
employee-owned businesses and co-operatives
 inspire and increase engagement and take-up of services by young people
focussing on enterprise pathways in schools, college (New College
Lanarkshire/South Lanarkshire College), University of the West of
Scotland (UWS), youth groups
 working alongside sectoral plans provide Business Gateway services to
key sectors including construction, food and drink, creative industries,
energy sector, manufacturing/engineering services, tourism, transport and
logistics
 delivery of support to town centre businesses to support North
Lanarkshire/South Lanarkshire town centre action plans
 increase engagement with non-engaged business and those who require
additional support to survive 
 Business Gateway Growth – a business with plans to increase turnover by a
minimum of £200,000 within 3 years 
4.15. Existing Business Service 2025/2026 performance to date:- 
Service Q1 Q2 Q3 Total Target % to Target
Business Base 106 73 96 275 375 73.3%
Local Priority 5 5 10 20 50 40.0%
Business Gateway
Growth
11 18 11 40 75 53.3% 
4.16. Enquiries from existing businesses have continued to decline, which directly affects
the ability to categorise customers as either Local Priority or Business Growth. 
Business Base enquiries have increased, with 41 more recorded compared to the
same period last year. 
4.17. Although these enquiries do not result in a customer categorisation - since the
business may be a lifestyle enterprise or may choose not to engage - the adviser
intervention still requires a minimum of 60 minutes per customer.  This includes
making initial contact, offering support, and completing necessary follow-up activity. 
4.18.  Local Priority was a new categorisation to the service and tracking commenced in
Quarter 2 2024 and is behind target.  As noted, this category relies on the right type
of customer enquiries entering the service and the customer engaging with the
adviser to work towards a business goal.
115

Page 116

4.19.  This category will remain a key focus for the new Business Support Team Leaders
who are working closely with the advisers to support with reviewing lapsed
customers from the Customer Relationship Management (CRM) database, including
those who are no longer supported by Scottish Enterprise and handling active leads
referred from the Federation of Small Business, Lanarkshire Chamber of Commerce
and Lanarkshire Business Hub. 
4.20. The Business Growth Categorisations are tracking behind the expected Quarter 3
position.  Whilst enquiry numbers declining contributes to this deficit, it has also been
impacted by a reduction in advisor resource due to ill health.  BGL is considering
options to address this capacity issue.   
4.21. To achieve the annual target, the following mitigation has been put in place:- 
 weekly - one to one meetings are being held with the advisers to review
personal performance, assess current pipelines and provide support with any
lead generation
 internal processes changed to refer potential growth clients from the Bank
Search database to the growth team in response to declining enquiries
 review of CRM lapsed accounts and those previously managed by Scottish
Enterprise
 targeted marketing activity including direct email outreach to the lapsed CRM
customers and promotional activity for Expert Help across Lanarkshire, to
stimulate new customer engagement 
Expert Help Support (Including Expert Surgeries and Workshops)
4.22. The Framework Agreement of Expert Help Consultancy Support allows SMEs based
in Lanarkshire to receive either an hour, one day (7 hours) and up to five days (35
hours) of fully funded consultancy support.  The aim is to ensure that in addition to
the 1-2-1 generalist support from a Business Gateway Adviser, where appropriate,
the customer can access qualified consultants to provide bespoke advice and a
customised action plan, focusing on sustainability and/or growth areas.  A £175,000
budget is assigned to each authority area. 
4.23. Budget remaining by Lot 2025/2026 
Budget
Remaining Ave project (Days)
Lot 1 - Financial Management    £7,038 12
Lot 2 - Business Growth and Development £21,128 37
Lot 3 - HR, Leadership and Skills £2,525 5
Lot 4 - Procurement £16,098 28
Lot 5 - Marketing £11,781 20
Lot 6 - Information and Digital Technology £6,100 11
Lot 7 - Energy Efficiencies and Net Zero £1,345 2
Lot 8 - New Market Opportunities and
Internationalisation £6,000 11 
4.24. Promotion of the Expert Help Framework has been ongoing across Business
Gateway social media channels, complemented by monthly email communications to
established businesses and direct promotion by advisers during networking events. 
A consultant event was also hosted at Motherwell Library on 23 October 2025 to
enable both local authorities to provide updates and gather feedback from the
consultants about the framework, business trends and challenges.  The consultants
reported that the low utilisation for projects was not a local challenge but being seen
across Scotland for marketing and procurement.
116

Page 117

Quality Assurance
4.25. The quality of Business Gateway service delivery in each local authority area is
monitored by Business Gateway National via an independent research organisation
which surveys clients that have interacted with the service.  Seeking feedback in
respect of the level of satisfaction related to six criteria, as follows:- 
 general satisfaction with the BGL service
 were expectations met/exceeded
 was the service provided of benefit to the business
 would they recommend the BGL service to others
 would they continue using the BGL service
 satisfaction with staff 
4.26. A score is generated based on the number of very satisfied/satisfied responses
received and compared against the national target of an 80% positive response. 
4.27. Year to date performance:- 
Service Target Q1 Q2
Satisfaction with BGL 80% 81% 68%
Expectations Met/Exceeded 80% 69% 81%
Beneficial to Business 80% 56% 64%
Likelihood to Recommend 80% 75% 74%
Likelihood to Keep Using 80% 81% 79%
Satisfaction with Staff 80% 88% 100% 
4.28. Monthly feedback provided from the Progressive Partnership remains the only way to
capture independent customer feedback and respondent numbers are as low as 4%. 
Business Gateway nationally are exploring new approaches for securing higher
volumes of feedback and have started a pilot with Business Gateway Fife. 
Whilst the satisfaction with staff remains positive, the team will continue to
encourage all customers who are engaged to complete the survey.   
Workshops/Events
4.29. A wide range of on-line webinars and tutorials are delivered by Business Gateway
nationally addressing a variety of business themes with quality content and
professionally delivered.  As such, the decision was taken that, locally BGL would not
duplicate the national offer but seek to complement this.  The advisory team reacted
to customer feedback and created new monthly bootcamps which cover the main
topics of startup, marketing, cash flow and business planning.  This allows advisers
to deliver support on a “one to many” approach.  This approach also allows
customers to meet in their local area and presents an opportunity to network with
others to start building a customer/supply chain base. 
4.30. Workshops and attendance is noted below:-  
Service Q1 Q2 Q3 Total
Local Workshops 5 5 6 16
Attended 29 40 29 98     
National Workshops 109 113 90 312
Attended 231 259 218 708
117

Page 118

4.31. To date, the local workshop offering has included 11 events held for the startup/new
business customers in a bootcamp format and 5 workshops/networking events for
the established business community.  The attendance ratio is much higher for these
“in person” events covering key business topics with 98 South Lanarkshire
participants attending. 
Local bootcamps have taken place in:- 
South Lanarkshire – Larkhall, Douglas, Blantyre, Hamilton and Bothwell
North Lanarkshire – Airdrie, Cumbernauld, Bellshill and Motherwell 
4.32. The established business events allow for trending topics to be delivered including
Cyber-crime and resilience, AI, Net Zero, internationalisation and business strategy. 
By providing a space for customers to network with other business owners and share
experiences and best practice, the Business Gateway team can then offer access to
the Expert Help and other local authority provisions – employability, grant funding,
planned events in marketing, financial management and digital marketing. 
4.33. Community Engagement events attended 
5.   Marketing 
5.1.  BGL continued to expand the brand visibility across Lanarkshire through community
outreach:- 
 Education sector: Point-of-sale materials and digital screens are now live in
South Lanarkshire College, targeting entrepreneurial students.  Regular drop in
to support students wishing to start their own business agreed
 DWP/Jobcentres: Material to be displayed in East Kilbride, Lanark and Hamilton
 Libraries and community venues: Agreement reached with South Lanarkshire
Leisure and Culture to display marketing materials in libraries 
5.2.  To drive awareness of the business grants available in both areas and target the
existing business audience, a two-week Meta lead-generation campaign ran during
Quarter 3.  The campaign generated 117 South Lanarkshire enquiries, 46 of which
are new to the BGL service (a mix of pre-start and established businesses). 
5.3.  Expert Help Promotion
 a new digital and print Expert Help brochure was produced for clients/partners
 promotion ran across email, social media, and increased video content
 during Climate Week 2025 and International Trade Week, BGL highlighted
consultancy support through targeted email and organic social activity
South Lanarkshire Lanarkshire Wide 
FSB at EK Collective - monthly Lanarkshire Hub
Clic networking Events at SLC Police retiral
Sharks Reef PACE
RTWS 25th Celebration Skilled Trades Network
South Lanarkshire College x 3 classes  SWIB Dinner
Tackling Poverty Exhibition BGLS Lunch
Stonehouse community council  Family Awards 
Lanarkshire Chamber of Commerce
Expo 
Build Lanarkshire
118

Page 119

 BGL trialled LinkedIn long-form articles featuring consultants including
procurement specialist Judith Stewart and HR specialists, with additional
promotion of internationalisation support 
5.4.   The focus for the next quarter will be to address the decline in existing business
enquiries by strengthening outreach and re-engagement activity with established
businesses.  Key actions will include:- 
 increasing general awareness of BGL through ongoing communications and
targeted promotional activity, including internal South Lanarkshire Council
(SLC) communication channels
 delivering targeted email communications to lapsed clients and established
businesses to encourage re-engagement and highlight available support
 continuing the promotion of Expert Help to established businesses - both
existing and prospective clients
 using Power AI insights to inform data-led decisions 
6.   Key Priorities
6.1. Key areas of activity:- 
 attend networking events with Federation of Small Businesses and the
Chamber of Commerce
 review boot camp workshops delivery and topics for improvement
 elected member briefings
 engage with local professional services companies more closely 
 creation of community champions allocation for key towns 
6.2. During Quarter 4 of 2025/2026 activities will be designed to increase brand
awareness and customer referrals to the service:- 
 continued networking with Council departments to encourage referrals
 adviser presence in South Lanarkshire College monthly - a drop-in session to
meet with student community
 the creation of an Ideas Generation workshop to facilitate those at very early
stage and reduce impact on adviser time 
 deliver a Neurodiverse start up workshop via 3rd party supplier 
7. Employee Implications
7.1. There are no direct employee implications as result of the contents of this report.
Business Gateway Lanarkshire is hosted by North Lanarkshire Council with the
Council’s Business Support Team providing management support.   
8. Financial Implications
8.1. This update sets out the work being delivered within existing business support
budgets.   
8.2. The additional £400,000 funding approved in the 2026/2027 budget for business
grants will provide a further opportunity to connect businesses with Business
Gateway. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no direct climate change implications as a result of this report.  The work
of BGL, however, can assist businesses on their journey to net zero.  
119

Page 120

10. Other Implications
10.1. As BGL will be the main conduit to the SME business base in Lanarkshire, they will
play a pivotal role in engaging with this business cohort in relation to our Marmot
Place programme during its developmental and delivery phases. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and therefore no impact assessment is
required. 
11.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
13 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Alison Brown, Head of Enterprise and Sustainable Development
Ext:  4700  (Tel:  01698 454700)
E-mail: alison.brown@southlanarkshire.gov.uk 
120

Page 121

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Flood Risk Management in South Lanarkshire 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an overview of Flood Risk Management (FRM) in South Lanarkshire,
including current legislation, national assessments, audits, and strategies as
they affect South Lanarkshire 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of this report be noted.
[1recs
3. Background
3.1. Flooding issues across South Lanarkshire are generally localised in nature and vary
significantly by location, making their overall extent difficult to quantify with certainty. 
The Council’s road and drainage networks interact with a range of watercourses,
surface water systems, and sewer networks, often across multiple catchments,
resulting in a fragmented drainage environment.  Responsibility for these are
generally out with the Council’s responsibilities therefore discussions and
agreements with third parties is often needed to take forward projects. 
3.2. Evidence from recent flood risk and surface water assessments indicates that,
across South Lanarkshire, flooding is predominantly associated with surface water
and carriageway flooding rather than river flooding and / or repeated and significant
flooding of internal properties, although this is the case in Coulter and remedial work
is underway to manage this.  Reported incidents are more commonly related to
roads, underpasses, and other low-lying sections of the transport network during
intense rainfall, which can cause disruption due to system capacity issues (such as
Scottish Water foul sewer and surface water systems) but are generally short-lived. 
3.3. Climate change predictions suggest Scotland will experience an increasingly warmer
and wetter weather shift.  South Lanarkshire is therefore predicted to have more
intense and / or prolonged rainstorms resulting in greater water surges through the
river networks, leading to an increase both in intensity and frequency of flood events. 
3.4. The most recent National Flood Risk Assessment states that during the medium
likelihood flooding scenario (a 1 in 200-year storm), there are 8,500 homes,
businesses, and services at risk of flooding within South Lanarkshire, which equates
to 1 in every 19 properties across the council area.  Details of these areas are
outlined in Section 5 of this paper.  
16
121

Page 122

4. Flood Risk Management (Scotland) Act 2009
4.1. The Flood Risk Management (Scotland) Act 2009 was brought in to improve the
assessment and sustainable management of flood risk across Scotland, provide a
framework for coordination and cooperation between organisations, and provide a
revised statutory process for flood protection schemes. 
4.2. This Act places duties upon South Lanarkshire Council as a Responsible Authority,
including:- 
 Act with a view to reduce overall flood risk
 Prepare maps of bodies of water
 Assess bodies of water
 Carry out clearance and repair works
 Prepare local flood risk management plans 
4.3. The Act also provides the Council with additional powers to carry out these duties,
including:- 
 Section 56 – General Power to Manage Flood Risk
 A local authority may do anything which it considers is necessary to reduce
the risk of a flood in its area. 
 Section 79 – Powers of Entry
 Any person authorised by a local authority is entitled to enter any land. 
5. SEPA – National Flood Risk Assessment (NFRA) 
5.1. The first NFRA was completed in 2011, and this assessment considered the
likelihood of flooding from rivers, groundwater, and the sea, as well as flooding
caused when heavy rainfall is unable to enter drainage systems or the river network. 
The likelihood of flooding was examined alongside the estimated impact on people,
the economy, cultural heritage, and the environment to identify the areas most
vulnerable to floods.  These locations were thereafter identified as Potentially
Vulnerable Areas (PVAs), with the following PVAs being included within the first
cycle of Local Flood Risk Management Plans (LFRMPs):- 
 PVA 11/13  White Cart Water catchment
 PVA 11/14  Rutherglen
 PVA 11/17/1  East of Glasgow
 PVA 11/17/2  Clyde Catchment – Motherwell to Lesmahagow
 PVA 13/07  Biggar 
5.2. The NFRA was updated by SEPA in 2018 as new datasets, flood modelling
technology and flood event information was now available to help create an
improved, more comprehensive assessment of flood risk across the country.  The
2018 NFRA also informed an update to the PVA boundaries and designations,
including the creation of a new PVA within South Lanarkshire covering Symington
and Coulter, producing a revised list of PVAs within South Lanarkshire within the
second cycle of LFRMPs:- 
 PVA 02/11/10 East of Glasgow to Strathaven
 PVA 02/11/11 Clyde Catchment – Motherwell to Larkhall
 PVA 02/11/12 Clyde Catchment – Lanark to Lesmahagow
 PVA 02/11/15 Symington and Coulter
 PVA 02/11/16 Rutherglen 
122

Page 123

 PVA 02/11/17 White Cart Water catchment
 PVA 02/13/01 Biggar 
5.3. The next iteration of the NFRA (NFRA 2025), will be available from Spring 2026. 
This new data is expected to provide the most comprehensive assessment of flood
risk available and will be used to inform the next cycle of National and Local Flood
Risk Management Plans. 
6. Flood Risk Management (Scotland) Act – Local Flood Risk Management Plans
6.1. Under the Act, Scotland has been split into Local Plan Districts (LPD) by river
catchments, with South Lanarkshire being actively involved in both the Tweed and
the Clyde and Loch Lomond LPDs. 
6.2. LFRMPs were first published in June 2016 and cover six-year planning cycles. 
These plans set the direction of flood risk management planning, helping to target
investment and coordinate actions.  Each LFRMP used the flood risk outputs from
the NFRA to characterise the different flood risks within each PVA, assign objectives
and identify and prioritise appropriate actions to be taken forward by Local
Authorities, SEPA, and Scottish Water.  Therefore, each LFRMP has actions
including Flood Studies, Surface Water Management Plans, and Maintenance of
Existing Assets within the relevant PVAs. 
6.3. Projects that have been identified within LFRMPs and have been delivered in recent
years include the River Clyde Flood Modelling Project, Halfway Surface Water
Management Plan, East Kilbride Integrated Catchment Study and Biggar Flood
Study. 
7. Scotland’s National Flood Resilience Strategy (2024)
7.1. This Strategy, part of The Scottish National Adaptation Plan 2024-2029 (SNAP3),
was published by the Scottish Government in December 2024 in response to the
climate emergency and significant flood events (e.g. Storm Babet in October 2023). 
7.2. The Strategy sets out the following vision for a flood resilient Scotland through 2045
and beyond, and aims to change the traditional approach of trying to stop flooding, to
creating more flood resilient places:- 
“Our people and places are prepared for increased flooding, and we are adapting to
a changing climate and creating sustainable resilient places in ways that are
inclusive and fair”. 
7.3. The Strategy is structured round the themes of People, Places and Processes and
sets out the following outcomes and priority actions:- 
 People Outcome –
 Creating flood resilient places involves our people and communities
 Places Outcome – 
 Land management and placemaking decisions follow good practise for flood
resilience
 Processes Outcome – 
 Flood resilience is blended into our places at all scales; a broader range of
actions are being delivered by a broader range of delivery partners 
123

Page 124

Priority Actions:- 
 Establish a flood advisory service
 Involve and support communities
 Improve land-use for flood mitigation
 Support a broader range of flood actions
 Improve flood resilience through data
 Support long-term transition planning for our most exposed communities 
7.4. As will be reiterated within the Audit Scotland findings referred to below, this Strategy
sets out several high-level proposals which aim to better understand and manage
flood risk across Scotland.  However, further information is needed on how this will
be achieved, which organisations will lead on each aspect, and the timescale for
changing our current processes. 
7.5. Regarding most of the actions proposed within the Strategy, the Council already
achieve most of these through the daily work of our Flood Risk Management Team,
most notably by way of the Development Management role, consideration of a wide
range of flood protection measures, use of the latest flood inspection/recording
software and regular liaison with affected communities. 
7.6. The Strategy does state that the next stage will be to develop an implementation
plan, which will set out how the required actions will be delivered to move towards
the Vision and the People, Places, Processes outcomes.  Therefore, at this time, it is
not clear what will be required of the Council going forward as part of this Strategy. 
8. Audit Scotland – Flooding in Communities (August 2025)
8.1. This audit was part of a wider programme of climate change audits undertaken by
Audit Scotland, with the aim of its recommendations being to inform the further
development of plans and actions related to the National Flood Resilience Strategy. 
8.2. Audit Scotland found that:- 
 There are good examples of public bodies and councils working well with each
other and with communities to tackle flooding.
 There are gaps in leadership, data, resources, skills, and capacity.
 The funding mechanism for major flood schemes is not fit for purpose.  Costs are
increasing with fewer homes than planned to be protected.
 There is great uncertainty for the funding of future flooding schemes.
 Better leadership and specific actions are needed to deliver the Scottish
Government’s National Flood Resilience Strategy.
 More needs to be done to tackle issues that can make flooding worse (such as
how land is used) and increase initiatives that can minimise flooding.
 Greater awareness of the risks of flooding and the action communities can take to
be better prepared. 
8.3. Several recommendations have been made within this audit, with the following
directly impacting the Council, Scottish Government, Scottish Water and SEPA:- 
 Work together to understand and prioritise addressing critical gaps in roles and
responsibilities, bringing greater clarity to existing arrangements for flood risk
management.
 Work together to understand and prioritise addressing critical gaps in information
and data, considering data standardisation where relevant.
124

Page 125

 Work together and with communities to develop specific actions for community
engagement as part of the National Flood Resilience Strategy implementation
plan.
 Review arrangements for flood-related services across different departments to
ensure effective and efficient delivery of these services, with long-term strategic
plans for addressing flood risk where relevant. 
8.4. This audit is welcomed, however, at this time it is unclear how the findings and
recommendations are proposed to be taken forward.  Further discussion will take
place at the upcoming Senior Officers’ Groups / SCOTS Flood Risk Management
Group meetings where the Council is represented. 
8.5. As noted in this report the Council already has robust and well developed processes,
actions, and responses in place to manage and consider flood risk across South
Lanarkshire; we will consider how these need to be adapted if necessary as the next
steps in considering the audit recommendations progress. 
9. Flooding Response / Priorities
9.1. As noted in section 4, the Act places duties upon South Lanarkshire Council as a
responsible authority, and the following provides some examples of how we fulfil
these:- 
 Mapping, Assessing and Clearing Watercourses:- 
 Regular inspections of watercourses and drainage systems.
 Removing debris and blockages from watercourses. 
 Map and record watercourse inspections. 
 Maintaining Existing Drainage Infrastructure:- 
 Undertaking structural improvements to culvert headwalls.
 Replacing damaged and / or inefficient culvert inlet trash screens. 
 Improving access arrangements for maintenance.
 Undertaking drainage investigations using CCTV survey equipment. 
 ‘Managing Flood Risk’ procedure:- 
 This is a comprehensive list of locations liable to flood within our area and
sets out the level and frequency of actions required.
 Locations include culvert inlets, road gullies, River Clyde, and bridges.
 Active between September and April, however, can be activated by senior
officers upon an extreme weather forecast.   
 Watercourse Telemetry Equipment:- 
 Remote monitoring and alarm equipment at 20 known flood locations across
the council area.  This equipment provides real-time access to water levels
which when used with rainfall forecast information, can help shape decision
making and resource allocation during storm events.
 At some locations we also have still-image cameras, which provide
photographs at request to allow remote inspections to be conducted at any
time.
 Alarms are also activated when watercourses reach pre-determined levels,
sending an automated text message to on-call officers to action accordingly.
125

Page 126

 Development Management:- 
 Planning applications are assessed to ensure new development is out with
floodplains, poses no increase of flood risk to neighbouring lands, and that
surface water is managed in a sustainable manner e.g. Sustainable Urban
Drainage Systems. 
 Bespoke Developer Design Guidance document for developers to adhere to,
which conveys the Council’s requirements in relation to both flood risk and
managing surface water.
 To ensure engineering competence in designs and proposals, this guidance
includes a self-certification process which requires developers / consultants
to provide evidence they hold sufficient qualifications and insurance
expected of a competent person tasked with preparing flood risk
assessments and drainage designs.   
 Flood Studies and Surface Water Management Plans:- 
 Undertake strategic flooding and drainage studies using hydrological and
hydraulic modelling techniques,
 Identify and assess the feasibility of potential flood protection measures. 
 Flood Protection Works / Schemes:- 
 Prepare contract information and technical drawings of proposed flood
protection measures and progress through tender stage to implementation. 
9.2. Appendix 1 sets out some of the key priority areas and projects which have emerged 
from the above actions and have been delivered as well as those currently being
progressed and / or under development. 
10. Summary and Conclusions
10.1. The Council is responding to flood risk in a structured, proactive and evidence-driven
manner, guided by the statutory responsibilities set out in the Flood Risk
Management (Scotland) Act 2009.  The Council demonstrates compliance with these
duties, including watercourse assessment, mapping, inspection, maintenance, and
the preparation of Local Flood Risk Management Plans.  These responsibilities are
supported by additional powers such as the general power to manage flood risk and
powers of entry which enable officers to conduct essential interventions quickly and
effectively. 
10.2. Operationally, the Council maintains a programme of watercourse inspections, debris
clearance, and drainage maintenance.  Structural improvements to culverts,
enhanced access arrangements and CCTV investigations further strengthen the
resilience of local drainage networks.  The well-established “Managing Flood Risk”
procedure ensures work is prioritised, particularly during the September to April
period when extreme weather is most likely, or when early warnings are received. 
10.3. A strength of the Council’s approach is its investment in telemetry and remote
monitoring technology.  With 20 monitored locations providing real-time water level
data, automated alerts and still-image capture, officers are equipped to make
informed, timely decisions during storm events.  This technology reduces response
times and enables resources to be deployed where they are most needed.
126

Page 127

10.4. Strategically, the Council plays an active role in both the Clyde and Loch Lomond
and the Tweed Local Plan Districts, contributing to coordinated catchment-based
planning.  The delivery of major LFRMP actions such as the River Clyde Flood
Modelling Project, Halfway Surface Water Management Plan, East Kilbride
Integrated Catchment Study and Biggar Flood Study illustrates the Council’s
commitment to turning strategic planning into practical, localised outcomes. 
10.5. The Council also maintains a strong focus on long-term resilience through its
development management role.  By ensuring new development avoids functional
floodplains, embedding Sustainable Drainage Systems (SuDS) and requiring
technical self-certification, the Council helps prevent the creation of new flood risks
while supporting sustainable growth. 
10.6. An important element of the Council’s forward planning is its alignment with the
National Flood Risk Assessment (NFRA).  First released by SEPA in 2011, the NFRA
is now undergoing its third update, with NFRA 2025 due in Spring 2026.  This edition
is expected to provide the most comprehensive assessment of flood risk to date. 
With improved mapping and advanced flood-modelling tools, it may result in revised
estimates of the number of at-risk properties in South Lanarkshire.  Once available,
the Council will integrate the updated figures into key documents, including the State
of Environment Report, Resource and Service Plans, and other climate-related
publications ensuring future decisions remain evidence-based and aligned with the
most up-to-date national data. 
10.7. The publication of the National Flood Resilience Strategy (2024) marks a further shift
toward long-term adaptation, community engagement, and enhanced resilience.
While the Council already delivers many of the Strategy’s aims through community
contact, varied flood protection measures and strong data use, Audit Scotland has
highlighted the need for clearer national leadership and firmer commitments in how
the Strategy will be delivered.  The Council is well positioned to respond as
implementation plans emerge and is actively engaging in SCOTS and senior officer
forums to understand future expectations. 
10.8. Overall, the Council demonstrates a forward-looking approach to flood risk
management.  Through a blend of operational readiness, strategic planning, strong
regulation of new development, adoption of modern monitoring technology and
alignment with national frameworks, the Council is addressing both current and
future flood challenges across its communities. 
10.9. Looking ahead, the Council recognises the importance of continuing to work closely
with national partners as Scotland’s approach to flood resilience evolves.  In the
coming months, officers will participate in SCOTS and other Senior Officers’ Groups
where the National Flood Resilience Strategy and its emerging implementation plans
will be examined in detail. 
10.10. These discussions will be essential in clarifying expectations, understanding any new
responsibilities, and assessing the potential implications for Council resources,
service delivery, and long-term planning.  By engaging actively in these forums, the
Council will ensure it remains well informed, prepared, and able to adapt effectively
as national policy, funding mechanisms and technical guidance continue to develop. 
11. Employee Implications
11.1. Increasingly frequent and intense flooding is placing greater pressure on the
Council’s statutory and operational duties.  Meeting requirements under the Flood
Risk Management (Scotland) Act 2009 including inspection, maintenance,
127

Page 128

watercourse assessment, and preparation of Local Flood Risk Management Plans
requires sustained staffing capacity. 
11.2. Operational tasks such as the “Managing Flood Risk” procedures and 24/7 telemetry
monitoring also depend on trained officers being able to respond quickly during
severe weather.  Strategic functions, including flood studies and development
management, also require specialist technical skills. 
11.3. With upcoming changes linked to NFRA 2025 and the National Flood Resilience
Strategy, further responsibilities are likely.  Additional employee resources may be
required to maintain compliance, manage increasing workloads, and continue to
protect communities effectively. 
12.   Financial Implications
12.1. Increasing flood risk and more frequent severe weather are creating rising financial
pressures on the Council’s flood management duties.  Core statutory activities such
as inspections, maintenance, drainage upgrades, and preparation of flood risk
management plans require consistent funding to remain effective. 
12.2. Operational response, telemetry systems, and emergency works also carry growing
costs, alongside the investment needed for flood studies and technical modelling. 
Audit Scotland has highlighted national uncertainty over future funding for flood
schemes, meaning local financial resilience is increasingly important. 
12.3. As NFRA 2025 and the National Flood Resilience Strategy introduce new
expectations; additional financial resources are likely to be required to meet future
obligations and maintain community protection. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no significant climate change, sustainability or environmental implications
arising directly from this report.  However, it is noted that the publication of the
updated National Flood Risk Assessment (NFRA) by SEPA may alter the number of
properties currently reported as being at risk of flooding within South Lanarkshire,
which could impact future climate-related reporting and planning. 
13.2. Although no immediate implications arise, the wider context remains that climate
change is driving more intense and frequent rainfall events, increasing pressures on
local drainage systems, and heightening the likelihood of surface water flooding. 
The Council’s ongoing work in flood studies, hydrological modelling and surface
water management planning continues to support long-term climate adaptation by
ensuring decisions are based on robust and up-to-date evidence. 
13.3. Sustainable approaches remain embedded in the Council’s development
management processes, including the use of Sustainable Drainage Systems and
ensuring new development avoids functional floodplains.  These measures help
manage water responsibly, reduce environmental impact and support resilient
place-making. 
13.4. The Council will continue to monitor emerging national data, including the NFRA
2025, and integrate any changes into future strategic documents to ensure climate
risk is understood and managed effectively. 
14. Other Implications
14.1. There are no significant risks associated with this report.
128

Page 129

15.  Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore, no integrated impact
assessment is required. 
15.2. As future schemes come forward appropriate consultation will be built into any
delivery programmes. 
Kevin Carr 
Executive Director (Community and Enterprise Resources) 
17 February 2026 
Link(s) to Council Values/Priorities/Outcomes 
 Focused on people and their needs 
 Working with and respecting others 
 Accountable, effective, efficient, and transparent 
 Ambitious, self-aware, and improving 
 Fair, open and sustainable 
 We will work to put people first and reduce inequality 
 We will work towards a sustainable future in sustainable places 
 We will work to recover, progress and improve 
 Good quality, suitable and sustainable places to live 
 Caring, connected, sustainable communities 
 Thriving business, fair jobs and vibrant town centres
 People live the healthiest lives possible 
Previous References 
 None 
List of Background Papers 
 None 
129

Page 130

Contact for Further Information
If you would like any further information, please contact: - 
Colin Park, Head of Roads, Transportation and Fleet Services
Ext:  4484  (Tel:  01698 454484)
E-mail:  Colin.Park@southlanarkshire.gov.uk 
130

Page 131

Appendix 1   
Key Priority Areas and Projects 
Actions from Local Flood Risk Management Plans: 
Flood Studies: 
 River Clyde
o Project complete, and outputs include a newly constructed hydraulic river
model, flood mapping, and assessment of the flood bunds at Clydesmill,
Dalmarnock and Meadowbank. This resulted in updates to SEPA’s and our
own flood mapping. 
 Strathaven
o Project complete, and outputs include a revised hydraulic river model and
flood maps. 
o Potential flood mitigation measures identified within this report require to be
reviewed regarding feasibility, cost/benefit, and prioritisation.  This will form
the basis of future programme of works when resources are available.   
 Biggar
o Project complete, and outputs include a revised hydraulic river model and
flood maps. 
o Potential flood mitigation measures identified within this report require to be
reviewed regarding feasibility, cost/benefit, and prioritisation. This will form the
basis of future programme of works when resources are available.   
 Coulter
o Project complete, and outputs include a revised hydraulic river model and
flood maps. 
o Potential flood mitigation measures identified within this report are in the
process of being delivered in a phased approach, with Property Level
Protection equipment being installed to at-risk properties in Spring 2026.
o Further flood mitigation measures will be reviewed and delivered in
forthcoming financial years. 
Surface Water Management Plans (SWMPs): 
 Hamilton
o Data-gathering has commenced, and this SWMP is scheduled to be
undertaken in 2026/27. 
 East Kilbride
o Project complete. Final outputs require to be discussed with SEPA and
Scottish Water to determine if any mitigation options are to be progressed. 
The conclusion of these will determine possible future works by all parties.   
 Muirbank
o Project complete. Final outputs require to be discussed with SEPA and
Scottish Water to determine if any mitigation options are to be progressed.
The conclusion of these will determine possible future works by all parties.  
131

Page 132

 Eastfield
o Project complete. Final outputs require to be discussed with SEPA and
Scottish Water to determine if any mitigation options are to be progressed.
The conclusion of these will determine possible future works by all parties.   
 Halfway
o Project complete. Final outputs require to be discussed with SEPA and
Scottish Water to determine if any mitigation options are to be progressed.
The conclusion of these will determine possible future works by all parties.   
Flood Risk Management Projects: 
Recently Completed 
 Lanark Loch, Lanark
o Replacement of the valve used to drain down reservoir, including extensive
footpath resurfacing and bank stabilisation works. 
 James Hamilton Heritage Loch, East Kilbride
o Undertake internal lining repairs to the damaged culvert which conveys the
outflow from the reservoir, reducing the need for extensive excavations and
disruption. 
 Carluke High School, Carluke
o Following the appearance of a sinkhole in the carriageway of Carnwath Road,
undertook emergency culvert reconstruction works to repair an internal
structural collapse within this historic drainage channel.   
 Staffa Road, Cambuslang
o Undertook bank stabilisation works using driven sheet piles, replace culvert
inlet trash screen, and construct new access arrangements for maintenance
staff. 
Upcoming Works 
 Bankhead Pond, Rutherglen
o Construction of new access road for maintenance vehicles, replacement of
culvert inlet trash screen and installation of ladder/steps for manual access for
clearing. 
 Coulter
o Installation of Property Level Flood Protection measures (flood doors, air-brick
covers, weep vents) to at-risk properties.
o Next phase will include formation of a flood exceedance route through the
village to reduce risk of floodwater impacting properties. This will be formed
by removing sections of walls and fences and using strategically placed
swales and culverts. 
 Carstairs Junction
o Further to several flood events impacting the town of Carstairs Junction,
council officers are progressing a Flood Study alongside our consultants to
better understand the flooding issues in this area.
132

Page 133

o This flood study will review all available information, produce detailed flood
inundation plans, undertake an assessment of flood risk receptors and
precited damages during various flood scenarios, and identify potential flood
mitigation measures. 
 Culvert Inlet Trash Screen Replacement Programme – various locations
o Replacement of damaged and historic culvert inlet trash screens across the
watercourse network with modern, safe, and efficiently designed trash
screens.
o Depending upon local requirements, these works will also include the
upgrading of access arrangements to allow safe access/egress and working
platforms for staff to undertake cyclic clearing/maintenance works. 
133

Page 134

134

Page 135

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Active Travel Schemes in South Lanarkshire 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 advise the Committee of active travel schemes implemented in South
Lanarkshire over recent years
 provide cycle usage monitoring information across South Lanarkshire 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of the report be noted; and
(2) note that, depending upon available funding, active travel infrastructure
improvements will continue to be developed and implemented in line with the
objectives of the National, Regional and the Local Transport Strategy. 
3. Background
3.1. On 1 October 2025, South Lanarkshire Council passed a motion declaring a climate
emergency.  The motion referred to the serious and immediate threat of climate
change and the need to accelerate the pace of delivering action.  A report to the
Executive Committee or Community and Enterprise Resources (CER) Committee,
was requested, as part of the final motion, providing an update on active travel
investment and its effectiveness, to allow for further scrutiny and this report is in
response to this request. 
3.2. Encouraging people to walk, wheel, and cycle for everyday journeys is essential to
achieving the goals of several key policies.  These include the National Transport
Strategy, National Planning Framework 4 (NPF4), Strathclyde Partnership for
Transport’s (SPT) Regional Transport Strategy for the west of Scotland 2023 to
2038, South Lanarkshire Local Development Plan (LDP2), and the draft Local
Transport Strategy 2026 to 2036. 
3.3. Fundamentally, providing increased and safer opportunities for people to choose
walking, wheeling, and cycling for everyday journeys promotes healthier lifestyles,
reduces environmental impact of transport, and improves accessibility. 
3.4. To provide a focus for the development of active travel infrastructure, the Council has
prepared Active Travel Studies for all major settlements in South Lanarkshire. 
Engagement with residents, elected members and stakeholders informed the
17
135

Page 136

development of these studies, through questionnaire surveys, workshops, and online
mapping for location-based comments. 
3.5. Feedback from residents and stakeholders frequently highlighted the need for
dedicated cycle routes, safer crossings, and speed reduction measures to encourage
more active travel.  These engagement activities, along with analysis of journey
origins and attractors and with reference to the latest best practice design guidance,
informed the development of aspirational and coherent active travel network plans
for each area.  These plans include priorities for route implementation. 
3.6. During the 2024/2025 financial year, Transport Scotland introduced a new tiered
model for funding active travel delivery in Scotland.  The Active Travel Infrastructure
Fund (ATIF) is now the primary vehicle for the Scottish Government to fund active
travel infrastructure.  As a replacement for the Cycling, Walking and Safer Streets
Fund, ATIF Tier 1 is provided directly to local authorities through the General Capital
Grant.  ATIF Tier 2 is open to applications to support the design, development, and
delivery of active travel infrastructure. 
3.7. ATIF Tier 1 is provided directly to local authorities through the General Capital Grant
and in 2026/2027 the Council is expected to receive around £2.400m with priorities
and projects presently being reviewed and assessed for delivery during 2026/2027. 
3.8. Guidance on the ATIF Tier 2, issued by Transport Scotland, notes that new cycling
infrastructure is unlikely to be funded unless it demonstrates a high level of service
as defined by Cycling by Design, particularly in urban areas.  Additionally, schemes
containing inappropriate use of shared use active travel infrastructure may also not
be successful in receiving funding. 
3.9. Applications for ATIF Tier 2 for the 2026/2027 financial year were submitted on 16
January 2026.  A total of 11 bids were submitted to a value of £720,000 and these
are outlined at Appendix 1.  The funding will allow designs to progress for potential
active travel routes on corridors identified in the South Lanarkshire Council Active
Travel Studies. 
3.10. Work would also include stakeholder and public engagement in the development of
these designs.  Should funding be successful, work would be undertaken in-house
and or through external consultants. 
3.11. Committee should note that the Council has also written to the Scottish Government
to request the full devolution of all active travel investment channelled through local
government to local government, to help direct investment to walking and wheeling,
as well as cycling whilst maintaining and valuing our partnership working with other
delivery agencies. 
4.  Implemented Active Travel Schemes
4.1. Over the years we have been very successful in securing external funding for active
travel projects and this allows us to also invest and tackle many of our routine
maintenance priorities (e.g. traffic signal, lighting and footways priorities) at the same
time as introducing new or enhanced active travel infrastructure. 
4.2. Funding for the development of active travel schemes has been provided by multiple
external funding partners including the Scottish Government, Strathclyde Partnership
for Transport, Walk Wheel Cycle Trust (formerly Sustrans), and Cycling Scotland.   
136

Page 137

4.3. Schemes are supported through awareness raising campaigns, Bikeability training at
schools and the wider work road safety education, training and publicity work
undertaken by officers. 
4.4. Funding from external partners totalled circa £9.775m over the last 4 financial years: 
2021/2022  £2,543,000 
2022/2023  £1,819,500
2023/2024 £2,665,000
2024/2025  £2,748,045 
4.5. Latest design standards have been used in the development of new schemes,
including reference to Cycling by Design and Manual for Streets ensuring inclusive,
accessible, and safe infrastructure for all ages and abilities. 
4.6. Key schemes delivered in the last 4 financial years have included:-  
 East Kilbride Town Centre Network Phase 1 - approximately 2.9 kilometres
circumnavigating the Town Centre and incorporates segregated/shared
pedestrian cycle provision, crossing upgrades, street lighting renewal, seating,
footway upgrades, and carriageway resurfacing. 
 East Kilbride Community Growth Area – provision of a cycleway along
Redwood Drive and Eaglesham Road/ Greenhills Road/ Redwood Drive
junction upgraded as part of the new Hairmyres Rail Station and Park and Ride. 
The junction includes segregated cycling and walking crossing points to benefit
all road users. 
 East Kilbride – Calderglen Country Park to Town Centre corridor.  To
supplement active travel infrastructure provided by Transport Scotland on the
A726 Queensway, a 3.5 metre shared use provision has been constructed from
A726 Strathaven Road/High Common Road slip eastwards to Calderglen
Country Park. The remaining section of this corridor is due for completion in
early 2026. 
 Carstairs to Carluke Cycle Network – introduction of cycle facilities by installing
build outs and implementing a reduced speed limit in Carstairs.  A link between
Carstairs Village and Carluke was developed using quiet roads between these
built-up areas.  These works included signing/road markings, suitable crossing
points of the A70 and A706 and carriageway upgrade works with associated
signing works on the quiet roads. 
 Clyde Bridge, Carstairs junction – active travel measures. 
 Active Travel Studies for Clydesdale area. 
 Development of concept designs for cross boundary cycle routes between
North and South Lanarkshire. 
 NCN74 route improvements in the vicinity of Raploch pitches, Larkhall. 
 NCN75 Clyde walkway enhancements between Newton and Carmyle as a
prelude to further widening and lighting. 
137

Page 138

 Spaces for People Schemes linked to social distancing. 
 Crossing facilities on Whitehill Road and Burnbank Road, Hamilton. 
 NCN756 Rutherglen Main Street crossing improvements. 
 Various Zebra and Toucan crossing improvements. 
 Measures to increase conspicuity of part time 20mph school zones and town
centre 20mph areas. 
 Cycle parking provision in Town Centres. 
 Various Cycle/scooter parking at schools. 
 Car Free Zones at Burnside Primary School and St Joseph’s Primary Schools. 
4.7.  During this financial year, funding from external partners totals £3.266m.  This is in
relation to the following active travel schemes: 
 Finalisation of active travel projects in relation to the new Hairmyres Rail Station
and Park and Ride. 
 Upgrading of Toucan crossings at three locations on Stewartfield Way. 
 Strathaven Road/Calderglen – completion of Town Centre to Calderglen
Country Park route.  The off-road cycle route will be implemented from A726
Strathaven Road/High Common Road slip eastwards to Calderglen Country
Park for approximately 500 metres and consists of 3.5 metre shared use
provision. 
 A70 Columbie Junction – as part of the Carstairs to Carluke Cycle Network, this
scheme will provide a dedicated cycle track at Columbie Junction, designed to
integrate with existing road layouts and provide safer crossing points for cyclists
and pedestrians. 
 Stonelaw Road, Rutherglen – implementation of continuous crossings across
side road junctions to improve pedestrian accessibility, complementing Council
Safer Routes spend. 
 Upgrading of the NCN75 route between Carmyle Viaduct and Bridge Street,
Cambuslang. 
 New and refurbished cycle parking shelters at schools. 
 Removal of barriers at circa 20 locations along the NCN. 
5.  Benefits, Monitoring and Evaluation
5.1. The health, environmental, economic, and social benefits of increased active travel
are well documented.  Transport Scotland have noted that according to the Sustrans
Walking and Cycling Index (2023), every year walking, wheeling, and cycling across
Scotland’s eight cities results in:-
138

Page 139

 4,251 serious long-term health conditions prevented
 90,000 tonnes of greenhouse gas emissions saved
 £1.1 billion in economic benefit for individuals and index cities
 Up to 440,000 cars taken off the road every day
 £53.6 million savings a year for the NHS (£11 million saved by cycling and
£42.6m saved by people walking and wheeling) 
5.2. Work undertaken by the Walk Wheel Cycle Trust (formerly Sustrans) notes that
swapping 40% of car journeys under 5km to active travel (walking, wheeling, or
cycling) would have reduced 2019 carbon emissions from cars by 9-11%. 
5.3. Monitoring is undertaken through automatic counters, manual counts at surveys and
public perception surveys and video analysis. 
5.4. The Cycling Scotland Annual Cycle Monitoring Report provides information for South
Lanarkshire and our progress towards increasing the uptake of cycling.  Cycling
Scotland also host the Active Travel Open Data Portal (ATOD) which is an
interactive portal providing cycling data for South Lanarkshire (and all other local
authorities). 
5.5. Key findings for South Lanarkshire from the Cycling Scotland Annual Cycle
Monitoring Report 2025 include:- 
 45% of all journeys within South Lanarkshire are less than 5km
 10.4% of people reporting that they had participated in at least 30 minutes of
cycling within 4 weeks prior to the survey (Scottish Household Survey 2023,
Table 5.1)
 29% of all households in South Lanarkshire have access to one or more
bicycles
 22% of all households in South Lanarkshire do not have access to a car for
private use
 Only 0.2% of employees cycle to work usually or regularly 
5.6. The Council also have our own cycle and pedestrian monitoring equipment which
can provide data for various locations across the Council area and this is available
on the Cycling Scotland Active Travel Open Data Portal (ATOD). 
5.7. Appendix 2 provides information on average daily and weekly counts of pedestrians
and people cycling from the range of count sites across South Lanarkshire (table 1)
and table 2 shows average daily counts of cycles from 2021 to 2025.  It should be
noted that there is a risk of potentially unreliable data at certain locations and also
missing data due to count site maintenance issues, meaning that year-on-year
comparisons should be treated as indicative rather than definitive. 
5.8. Table 1 shows that total daily pedestrian count across 29 pedestrian sites is 3,712
with a daily cycling count of 1,117 across 47 cycling sites.  On a weekly basis, this
equates to 25,984 pedestrians and 7,819 cyclists. 
5.9. The highest cycling activity is observed at:- 
 Hamilton – Mausoleum Drive (around 71 cyclists per day)
 A730 Rutherglen, Glasgow Road (around 73 cyclists per day)
139

Page 140

5.10. Several rural or semi-rural routes (notably parts of the B7078 corridor) also record
relatively high cycling volumes, indicating their importance for leisure or
longer-distance cycling. 
5.11. Table 2 illustrates that across many count sites, average daily cycling levels
generally increased between 2021 and 2022, indicating a broad uplift in cycling
activity following the early post-pandemic period.  From 2023 onwards, trends
become more mixed, with some sites continuing to grow, others stabilising, and
several showing year-to-year volatility rather than a consistent upward or downward
pattern. 
5.12. Some locations show marked increases in specific years, particularly:- 
 B7078 South of Coalburn, which rises steadily to a notably higher level by 2025
 Mausoleum Drive, Hamilton, which shows a sustained increase from 2021
through to 2025
 A730 Rutherglen, Glasgow Road, which remains one of the consistently
higher-volume cycling sites across the period 
5.13. However, there are also locations that show a downward trend in cycling levels,
including at Hyndford Road (Lanark), Pankhurst Road (East Kilbride), the B7078
North of Lesmahagow and Johnstone Drive (Rutherglen). 
5.14. Taken together, Table 2 suggests that cycling levels across the network have
broadly recovered and, in many cases, improved compared with 2021, but that
growth is not uniform across all locations, and the evidence points to localised trends
rather than a single network-wide trajectory.  However, levels of cycling experienced
during the pandemic show the potential to increase cycling levels with sustained
investment in safer route networks as shown in the Active Travel Studies referred to
earlier in this report. 
5.15. User feedback is also received and by way of example, feedback was gained from
Universal Connections East Kilbride in relation to the infrastructure which has been
introduced in recent years in East Kilbride.  This feedback noted significant increase
in their cycling courses offered, and the breaking down of barriers that previously put
people off cycling.  Universal Connections East Kilbride also added that alongside
their bike library, they have been able to secure bikes for some of their most
vulnerable services users who are now embracing cycling across East Kilbride. 
5.16. Video surveys are also a tool to aid monitoring and evaluation of significant new
transport infrastructure.  As noted earlier, a new junction improvement scheme that
involved the conversion of a roundabout into a fully signalised junction has been
implemented at Eaglesham Road/Greenhills Road/Redwood Drive.  This intervention
was designed and constructed to:-
 improve vehicular capacity and reduce congestion
 provide safe, segregated pedestrian crossings in line with planning obligations
 support sustainable transport modes and future development 
5.17. Initial video survey analysis undertaken in September 2025 at this junction showed
significant pedestrian and cycling movements.  Over a weekly period from 12 – 18
September, data showed 2,763 pedestrians crossing at the junction, 242 cycle
crossings and 278 people cycling on the road.  Further monitoring will be undertaken
at this junction this year. 
140

Page 141

5.18. Anonymised data for cycling leisure and commuting trips is provided by the Strava
Metro platform.  This platform also provides indicative estimate CO2 savings for
journeys recorded on this platform.  In an analysis of cycling trips recorded within
South Lanarkshire, as expected there was a decrease in total cycling trips from
pandemic levels, but the data is showing a stabilisation in cycling trips between 2024
(75,973 trips) and current 2025 levels (74,195 trips at the end of November 2025). 
The platform also provides estimates of CO2 emission savings for these recorded
trips, which in 2024 was estimated as 84,467kg (84.47 tonnes). 
6. Summary
6.1. South Lanarkshire Council has made sustained progress in the planning, delivery,
and monitoring of active travel infrastructure across the Council area, supported by
external investment and aligned with national, regional, and local policy objectives. 
6.2. Improvements to walking, wheeling, and cycling networks deliver health,
environmental and accessibility benefits, while monitoring data and user feedback is
helping to inform future priorities. 
6.3 Subject to the availability of external funding, the Council will continue to develop,
deliver, and evaluate active travel schemes to support modal shift, reduce reliance
on private car use, and contribute to the creation of healthier, more sustainable
communities across South Lanarkshire.  This will be informed through engagement
with residents, elected Members, and stakeholders on significant active travel
schemes. 
7. Employee Implications
7.1. Employee resources will continue to be required to progress further monitoring,
funding applications, and design and implementation of active travel schemes. 
8. Financial Implications
8.1. Progress on the implementation and monitoring of active travel schemes will
continue to be dependent upon the availability of external funding. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The continued implementation of walking, wheeling, and cycling schemes is
expected to encourage the uptake of active and sustainable travel within the
Council’s local communities, whilst reducing reliance on private vehicles particularly
for the shorter more local journeys.  This supports a range of policy areas including
South Lanarkshire’s Sustainable Development and Climate Change Strategy. 
9.2. Increased active travel and access to the outdoors will improve health and wellbeing
whilst reducing reliance on fossil fuels for the purpose of travel.  Encouraging the
uptake of active and sustainable travel will also support improvements in air quality
emissions by reducing the number of private car journeys and their resultant
emissions. 
10. Other Implications
10.1.  There are no significant risks associated with this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required.
141

Page 142

11.2. As future schemes come forward appropriate consultation will be built into any
delivery programmes. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
17 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 South Lanarkshire Cycling Partnership, 7 March 2022
 South Lanarkshire Cycling Partnership, 28 November 2022
 South Lanarkshire Cycling Partnership, 27 November 2023
 South Lanarkshire Cycling Partnership, 25 March 2024
 South Lanarkshire Cycling Partnership, 17 March 2025
 South Lanarkshire Council, 1 October 2025 
List of Background Papers
 Benefits of Active Travel | Transport Scotland
 Annual Cycling Monitoring Report 2024, Cycling Scotland
 Reaching Net Zero: The role of active travel, Walk Wheel Cycle Trust
 South Lanarkshire Council Active Travel Studies
 Cycling Scotland Open Data Portal 
Contact for Further Information
If you would like further information, please contact:- 
Colin Park, Head of Roads, Transportation and Fleet Services
Ext:  4484  (Tel:  01698 454484)
E-mail:  Colin.Park@southlanarkshire.gov.uk
142

Page 143

Appendix 1 
Bid title Brief summary Bid value
1.Safer school
streets-
Infrastructure
to support
20mph limits
for safer and
active travel
The project will develop concept designs for measures to
improve conditions for active travel within the vicinity of the
school tailored to each school’s context.  Options may
include signage, traffic-calming features, gateways, cycle
parking and various minor improvements.
£175k
2.Hamilton
Black Path
This project was identified within the Hamilton Active Travel
Study as a key east to west link within the south of Hamilton
area.  Project is to prepare design options for the 3km path
from Earnock Road to Strathaven Road and associated
crossing points.
£50k
3.Hamilton
South Links
This project was identified within the Hamilton Active Travel
Study as a priority link within the Hamilton area.  The 3km
route extends from the centre of Hamilton to the Eddlewood
estate south of the city centre.
£50k
4.Bothwell
(Raith) to
Uddingston
Identified as a core route within the Bothwell, Blantyre and
Uddingston Active Travel Study.  Project is to examine
potential rerouting of NCN74 to connect Station Road to
Langside Road and onto the cycleway that was constructed
as part of the Raith Interchange.
£50k
5.East Kilbride
Community
Growth Area to
Town Centre
Corridor
Queensway to Hairmyres identified as a core route in the
East Kilbride Active Travel Study.  Project to examine design
options along Eaglesham Road from A726 Queensway to
Peel Road roundabout.
£50k
6.East Kilbride
Town Centre –
West Mains
Engagement to inform development of route options on
West Mains Road (between its remote footpath connection
with Creighton Grove and Priestknowe roundabout).
£25k
7.Carluke
Active Travel
Study to develop design options and to undertake
engagement in relation to the core north south route as
identified in the Carluke Active Travel Study.
£35k
8.Lanark
Active Travel
Study to develop design options and to undertake
engagement in relation to the core cross town route as
identified in the Lanark Active Travel Study.
£35k
9.Rutherglen,
Cambuslang to
Blantyre
The Cambuslang and Rutherglen Active Travel Study
identified the A724/B768/A730 as an early priority corridor.
Project is to further develop design options and to undertake
engagement to complement and to enhance existing active
travel infrastructure.
£150k
10.NCN75
Newton to
Uddingston
(Westburn
Road)
Route was identified within the Cambuslang and Rutherglen
Active Travel Study as a main east – west route which
utilises the existing NCN75 route.  Project is to examine
options and design proposals for a potential off route.
£50k
11.Cathkin
Bypass to Mill
Street
Route was identified within the Cambuslang and Rutherglen
Active Travel Study as a main north – south route through
Rutherglen and Cambuslang.  Project is to examine and
design route options.
£50k 
Bid total £720k
143

Page 144

Appendix 2 
Table 1: Average daily and weekly counts of pedestrians and people cycling at count sites
(Source: Cycling Scotland Cycling Open Data) 
Location  Average Daily  Average weekly 
Pedestrians Cycles  Pedestrians Cycles  
A749 Rutherglen, Mill
Street 
122 24  854 168
A702 Nether Abington  - 3  - 21
A71 Hyndford Bridge  1 4  7 28
A72 Larkhall, Carlilse Road  20 9  140 63
A724 Blantyre, Glasgow
Road 
13 16  91 112
A724 Cambuslang,
Hamilton Road NBND 
127 21  889 147
A724 Cambuslang,
Hamilton Road SBND 
81 9  567 63
A724 Clydeford Road
(Northbound) 
117 14  819 98
A724 Clydeford Road
(Southbound) 
148 23  1036 161
A730 Rutherglen, Glasgow
Road 
321 73  2247 511
A749 Rutherglen, East
Kilbride Road 
44 24  308 168
Ardochrig  - 44  - 308
B7056 Yieldshields Road  - 17  - 119
B7071 Hamilton, Bothwell
Road 
159 18  1113 126
B7076 Newton Farm (South
of M74 Jct 14)  
6   42
B7078 Netherton Farm
(South of A70) 
- 20  - 140
B7078 North of
Lesmahagow 
37 38  259 266
B7078 South of Coalburn  7 42  49 294
B7078 South of
Lesmahagow 
7 70  49 490
B743 Glengavel Reservoir  - 30  - 210
Blantrye Farm Road  29 11  203 77
Blantyre, Glasgow Road
Southbound 
10 9  70 63
Bothwell, Ferry Road  255 10  1785 70
Bothwell, North British
Road 
203 16  1421 112
Cambuslang, Clyde
Pathway 
44 25  308 175
Cathkin Bypass  42 23  294 161
Cornwall Street (East
Kilbride) 
338 22  2366 154
East Kilbride, Calderwood
Road 
104 23  728 161
East Kilbride, Pankhurst
Road 
81 12  567 84
East Kilbride, West Mains
Road 
253 37  1771 259
Hamilton - Mausoleum
Drive 
506 71  3542 497 144

Page 145

High Blantyre, Main Street  - 27  - 189
Lanark, Hyndford Road  - 36  - 252
Larkhall, Burnbrae Street  102 33  714 231
Lindsaylands Road  - 10  - 70
Millheaugh Road  - 3  - 21
Millwell Road  - 38  - 266
North of Gilmourton
(Westlinbank Farm) 
- 14  - 98
Old Wishaw Road (Carluke)  160 6  1120 42
Pettinain Road  - 15  - 105
Rutherglen, Johnstone
Drive 
- 88  - 616
Ryeflat Road (North of
Carstairs) 
- 10  - 70
Sandilands  - 10  - 70
Spital Road  - 4  - 28
Station Road (Bothwell)  162 12  1134 84
Tinto Hill (ex Devonside
Road)  
8   56
Uddingston - North British
Road Underpass 
219 39  1533 273       
TOTAL  3712  1117  25984  7819 
145

Page 146

Appendix 2 
Table 2: Average daily counts of people cycling at count sites 2021 – 2025 (Source: Cycling
Scotland Cycling Open Data) 
Average Daily Cycle Count
Year 2021 2022 2023 2024 2025
Location     
A749
Rutherglen, Mill
Street
15 54 17 54 n/a
A702 Nether
Abington
2 3 7 8 2
A71 Hyndford
Bridge
5 4 4 5 5
A72 Larkhall,
Carlisle Road
6 n/a 11 9 17
A724 Blantyre,
Glasgow Road
1 33 26 0 21
A724
Cambuslang,
Hamilton Road
Northbound
15 24 23 21 21
A724
Cambuslang,
Hamilton Road
Southbound
4 21 n/a 3 19
A724 Clydeford
Road
(Northbound)
25 25 50 4 19
A724 Clydeford
Road
(Southbound)
12 25 26 19 21
A730
Rutherglen,
Glasgow Road
66 90 33 80 90
A749
Rutherglen, East
Kilbride Road
18 27 26 25 27
Ardochrig 22 47 44 46 n/a
B7056
Yieldshields
Road
10 19 19 18 14
B7071 Hamilton,
Bothwell Road
5 21 18 17 18
B7076 Newton
Farm (South of
M74 Jct 14)
6 7 6 6 7
B7078 Netherton
Farm (South of
A70)
15 37 26 8 9
B7078 North of
Lesmahagow
56 41 35 31 33
B7078 South of
Coalburn
15 38 63 57 93
146

Page 147

Average Daily Cycle Count
Year 2021 2022 2023 2024 2025
B7078 South of
Lesmahagow
89 36 53 199 55
B743 Glengavel
Reservoir
31 42 32 25 35
Blantrye Farm
Road
19 19 n/a 2 14
Blantyre,
Glasgow Road
Southbound
0 8 10 0 18
Bothwell, Ferry
Road
1 13 10 n/a n/a
Bothwell, North
British Road
41 25 n/a 1 7
Cambuslang,
Clyde Pathway
3 25 22 17 24
Cathkin Bypass 8 21 26 24 25
Cornwall Way
(East Kilbride)
16 14 23 33 19
East Kilbride,
Calderwood
Road
19 21 20 24 24
East Kilbride,
Pankhurst Road
16 13 12 11 10
East Kilbride,
West Mains
Road
21 48 28 n/a n/a
Hamilton -
Mausoleum
Drive
37 73 76 68 77
High Blantyre,
Main Street
12 18 47 16 n/a
Lanark, Hyndford
Road
50 46 40 27 14
Larkhall,
Burnbrae Street
128 170 36 31 41
Lindsaylands
Road
0 15 14 0 12
Millheaugh Road 3 6 5 5 2
Millwell Road 30 64 13 0 -
North of
Gilmourton
(Westlinbank
Farm)
8 16 15 14 8
Old Wishaw
Road (Carluke)
4 9 8 1 9
Pettinain Road 12 18 3 14 19
Rutherglen,
Johnstone Drive
0 114 111 29 5
Ryeflat Road
(North of
Carstairs)
6 10 13 11 8
Sandilands 7 16 20 1 12
Spittal Road 0 6 5 0 5
147

Page 148

Average Daily Cycle Count
Year 2021 2022 2023 2024 2025
Station Road
(Bothwell)
6 13 12 12 -
Tinto Hill (ex
Devonside
Road)
7 8 8 8 10
Uddingston -
North British
Road Underpass
22 50 37 31 35 
148

Page 149

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of meeting: 17 March 2026
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Bereavement Services Update 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 provide an update on legislative changes impacting on Bereavement Services
 update members on the Bereavement Services Strategy, which was approved by
the Executive Committee at its meeting held on 26 June 2024 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the legislative changes within the Burial and Cremation (Scotland) 2016 Act
and The Burial (Management) (Scotland) Regulations 2025 outlined in section 4
of the report, be noted; and
(2) that the progress of the Bereavement Services Strategy outlined in section 5 of
the report, be noted. 
3. Background
3.1. South Lanarkshire Council operates a Bereavement Service that provides a dignified
and sensitive burial and cremation service. 
3.2. The key piece of legislation governing the service is the Burial and Cremation
(Scotland) Act 2016 which was passed by the Scottish Parliament on 22 March 2016
and received royal assent on 28 April 2016.  The 2016 Act fulfils the commitment of
the Scottish Government to implement the recommendations made by:- 
 The Burial and Cremation Review Group (2007)
 The Infant Cremation Commission (2014)
 The National Cremation Investigation (2016) 
3.3. In July 2016 a working group headed by the Scottish Government was formed to
work on the regulations of the Act and after prioritising Part 2 (Cremation) of the Act,
the Cremation (Scotland) Regulations 2019 were introduced from 4 April 2019. 
3.4. Having been hampered by the Covid 19 pandemic The Burial (Management)
(Scotland) Regulations 2025 and the Burial and Cremation (Inspection) (Scotland)
Regulations 2025 were approved by the Scottish Parliament on 8 January 2025. 
3.5. Further updates to the regulations announced on 4 February 2026 with The Burial
and Cremation (Applications and Registers) (Miscellaneous Amendment) (Scotland)
Regulations 2025 will come into force on 2 March 2026.  The Regulations amend the
18
149

Page 150

Cremation (Scotland) Regulations 2019 and the Burial (Applications and Register)
(Scotland) Regulations 2024. 
3.6. To support The Burial and Cremation (Inspection) (Scotland) Regulations 2025 a
Funeral Sector Register (“the Register”) was introduced on 1 April 2025, this register
acts as a single point of information about the funeral sector in Scotland and grants
powers to Funeral Sector Inspectors to undertake inspections to ensure compliance
with relevant legislation and requirements. 
4. The Burial and Cremation (Scotland) 2016 Act and The Burial (Management)
(Scotland) Regulations 2025 - Key Points
4.1. Sections 14 and 16 of the 2016 Act address the duration of burial rights and will
come into force on 1 March 2026.  These have wide ranging implications for
residents who purchase lairs from this point onwards, as well as implications on how
the Council manages lairs across cemeteries in South Lanarkshire.  The new
legislation will now mean that:- 
 any new right of burial granted will no longer be held in perpetuity by the right
holder.  Instead, it will be held for an initial period of 25 years
 following this period, the right of burial can be extended for an additional 10
years, and further extensions of 10-year periods can be requested thereafter
 to ensure right holders are well informed, a notification will be sent to the
contact address on the registers at least 3 months before the end of the burial
right period.  This notification will indicate the date on which the right is set to
expire, inform the right holder of their option to apply for an extension, and
clarify that the right will be extinguished if no extension application is made
 should the right of burial be extinguished, the rights will revert to the local
authority
 if the right to burial is not extended, it is automatically extinguished.  Where this
happens with an unused lair, the burial authority may re-sell the right of burial in
that lair.  Where the lair is used or partially used the lair can be considered for
re-use under sections 32 to 44 of the 2016 Act: Lair – Restoration to Use (when
those sections of the 2016 Act come into force) 
5. Bereavement Services Strategy Update
5.1. As part of the Strategy a new simple service was introduced at the crematorium and
a reduction in the cost of the direct cremation to add to the options available for a
bereaved family and at a lower cost which recognises the continued financial
difficulties faced by so many in the community.  This action has seen an increase in
the uptake of the earlier service time slots as demonstrated below:- 
Financial Year Direct Simple
Service
Total  % increase
on previous
year
8am and
8:15am
Services
2023/2024 19 N/A* 19 N/A
2024/2025 27 1 28 47%
2025/2026      
(to 18/2/2026) 25 10 35 25%
*The simple service was introduced in November 2024 
150

Page 151

5.2. A strategic approach has been taken by staff to identify lairs previously unused
within existing boundaries to ensure all available land resources are being used. 
5.3. A programme of works commenced to achieve maximum land use within our existing
cemeteries within capacity increases as set out below:- 
 identifying an area within Rutherglen Cemetery boundary which has increased
the new lair available by 74 lairs
 new extension in Philipshill has been completed creating 932 new lairs
 in Strathaven cemetery potentially 27 new lairs have been identified within its
existing boundaries 
A review of cemetery catchment capacities and demand is undertaken every 5
years, with the next review due in 2028. 
5.4. A plan of action to re-claim burial ground where the right of burial was previously
purchased but the rights have not been exercised is also being developed.  The plan
is being progressed in collaboration with colleagues in Legal Services and will
include the following considerations:- 
 re-purpose use of lairs in older sections of cemeteries which are generally
narrower (measuring 3 feet in width).  This narrowness limits the size of
headstones, which may affect their appeal.  Due to their size, it may be
advantageous to repurpose these lairs for ashes only if the burial rights are
terminated
 consideration of fully grassed areas without footpaths, which might be less
attractive to some visitors as potential ashes only lairs
 compliance with the Equality Act 2010 is necessary to ensure reasonable
adjustments for accessibility within the cemetery
 burial rights are not considered assets; only the original purchase amount
should be refunded, with most lairs having been bought before decimalisation
 methods for contacting potential lair owners or their families to confirm rights
(letters to last known addresses, social media/website, media)
 documentation requested from claimants to verify identify i.e. original lair
certificates, death certificates if the owner is deceased, birth and/or marriage
certificate 
5.5. As work progresses to finalise the plan, updates will be provided to local members
on any implications for cemeteries in their area. 
5.6. In terms of modernising and transformation of the services IT systems, significant
investment has been made to transition to a new cloud-based IT system.  This
system will modernise processes within the service, improve resilience and
eventually enhance the customer experience by:- 
 establishing an integrated mapping system
 allowing remote access to systems
 digitising existing paper-based processes and work instructions
 providing digital headstone inspection reports
 reducing data risk and increasing resilience 
6. Employee Implications
6.1. None
151

Page 152

7. Financial Implications
7.1. The service is reviewing future budget requirements in line with the Strategy and
considering income targets that are more aligned with service demand projections. 
8. Climate Change, Sustainability, and Environmental Implications
8.1. The Bereavement Services Strategy will support delivery of the Council’s Climate
Change and Sustainable Development Strategy and progress more sustainable
options for delivery services such as alternatives to coffin and burial provision and
woodland burials. 
8.2. The crematorium is fully abated (abatement is where the toxic gases are removed
and are not released into the atmosphere) and therefore has a low environmental
impact which is in line with the Council’s and the Resources’ commitment to
sustainable environment.  The technology and equipment required for the abatement
system was invested in the facility from the beginning with the sustainable
environment commitment in mind. 
9. Other Implications
9.1. There are no other significant implications as a result of the contents of this report. 
10. Strategic Environmental Assessment
10.1. A screening determination was completed in relation to the Strategic Environmental
Assessment (SEA) which confirmed there is no need for a sperate SEA for these
proposals. 
11. Equality Impact Assessment and Consultation Requirements
11.1. An equality impact assessment (EQIA) has been undertaken during the development
of the proposals to identify and mitigate any negative impacts and seek opportunities
to promote equality. 
11.2. The assessment is that the proposals do not have any adverse impact on any of the
protected characteristics groups. 
11.3. No consultation was required in terms of the contents of this report. 
Kevin Carr
Executive Director (Community and Enterprise Resources) 
25 February 2026 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
152

Page 153

Previous References
 South Lanarkshire Council Cemetery Strategy 2023 to 2033 – Community and
Enterprise Resources Committee – 30 May 2023
 Recommendations Referred from Resource Committee – Executive Committee – 26
June 2024 
List of Background Papers
 Bereavement Services Cemetery Strategy 2023 to 2033 – Community and Enterprise
Resources Committee – 30 May 2023 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Colin Reid, Grounds and Waste Operations Manager
Facilities, Waste and Grounds Services
Email: colin.reid2@southlanarkshire.gov.uk