Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Friday, 26 September 2025 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 07 October 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John
Anderson, Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Andrea Cowan,
Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal
Johnston-Dempsey, Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian
McAllan, Kenny McCreary, Davie McLachlan, Carol Nugent, Kirsten Robb, Helen Toner,
David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lesley
McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott, David
Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources
Committee held on 12 August 2025 submitted for approval as a correct
record.  (Copy attached) 
5 - 16 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2025/2026
Joint report dated 3 September 2025 by the Executive Directors (Finance
and Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
17 - 26 
4 Community and Enterprise Resources - Capital Budget Monitoring
2025/2026
Joint report dated 17 September 2025 by the Executive Directors
(Finance and Corporate Resources) and (Community and Enterprise
Resources).  (Copy attached) 
27 - 30 
5 Community and Enterprise Resources – Workforce Monitoring – June and
July 2025
Joint report dated 28 August 2025 by the Executive Directors (Finance
and Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
31 - 38 
Item(s) for Decision 
6 Community and Enterprise Resources' Workforce Plan 2025 to 2027
Report dated 22 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
39 - 80 
7 Employability Performance Update
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
81 - 100 
8 Business Gateway Lanarkshire – 2024/2025 Performance Report
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
101 - 112 
9 Community Benefit Funds – Renewable Energy Fund - Grant Applications
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
113 - 118 
10  Chatelherault and Calderglen Country Park Masterplans and Associated
Phase 1 Projects
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
119 - 148
2

Page 3

11  New Lanark World Heritage Site Management Plan 2025 to 2030
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
149 - 184 
12  Response to Commercial Waste Motion
Report dated 22 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
185 - 190 
Item(s) for Noting 
13  South Lanarkshire Inward Investment and Property Enquiries Update
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
191 - 196 
14  Garden Waste Permit Scheme - Progress Report
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
197 - 200 
15  Roads Asset Management Plan 2025 - Update
Report dated 17 September 2025 by the Executive Director (Community
and Enterprise Resources).  (Copy attached) 
201 - 214 
16  Annual Update on the Community and Enterprise Resources' Risk
Register
Report dated 17 September 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
215 - 232 
Urgent Business 
17  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 12 August 2025 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Ross
Clark (substitute for Councillor Gladys Ferguson-Miller), Councillor Gerry Convery, Councillor
Andrea Cowan, Councillor Margaret Cowie, Councillor Maureen Devlin (Depute), Councillor Colin
Dewar, Councillor Allan Falconer (substitute for Councillor Andy Carmichael), Councillor Ross
Gowland, Councillor Graeme Horne, Councillor Cal Johnston-Dempsey, Councillor Susan Kerr,
Councillor Martin Lennon, Councillor Richard Lockhart, Councillor Hugh Macdonald, Councillor Ian
McAllan, Councillor Kenny McCreary, Councillor Davie McLachlan, Councillor Carol Nugent,
Councillor Kirsten Robb, Councillor Helen Toner, Councillor David Watson 
Councillors' Apologies:
Councillor Andy Carmichael, Councillor Joe Fagan (ex officio), Councillor Gladys Ferguson-Miller 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
C Brown, Environmental Services Manager; F Carlin, Head of Planning and Regulatory Services; K
Carr, Head of Facilities, Waste and Grounds Services; A Goldie, Operations Manager; K Lean,
Economic Development Manager (Funding and Rural); K McGuire, Waste Services Manager; C
Park, Head of Roads, Transportation and Fleet Services; I Ross, Economic Development Manager;
G Simpson, Partner Liaison Manager
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); J Davitt, Public Relations Officer; L Harvey, Finance
Manager (Resources); E Maxwell, HR Business Manager; T Slater, Administration Adviser; N
Tollan, Administration Assistant 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 13
May 2025 were submitted for approval as a correct record. 
In relation to item 2 of the minutes, the Head of Facilities, Waste and Grounds Services provided
an update on the uptake of the burgundy bin/garden waste permits and undertook to provide an
update report to the next meeting of the Committee. 
The Committee decided: that the minutes be approved as a correct record. 
3 Community and Enterprise Resources - Revenue Budget Monitoring 2024/2025 
A joint report dated 25 June 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April 2024 to 31 March 2025.
2
5

Page 6

A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report. 
At 31 March 2025, the actual outturn position for 2024/2025 for the Resource, before transfers
to reserves, was an underspend of £0.617 million, with a breakeven position following approved
transfers to reserves. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in the appendices to the report. 
The Committee decided: 
(1) that the position to 31 March 2025 of a breakeven position, after approved transfers to
reserves, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference: Minutes of 13 May 2025 (Paragraph 3)] 
Councillor Horne joined the meeting during this item of business 
4 Community and Enterprise Resources - Revenue Budget Monitoring 2025/2026 
A joint report dated 25 June 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April to 16 May 2025 and
providing a forecast for the year to 31 March 2026 for Community and Enterprise Resources. 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report. 
At 16 May 2025, the projected outturn position for the Resource was a breakeven position. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in the appendices to the report. 
The Committee decided: 
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in Appendix A of
the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
5 Community and Enterprise Resources - Capital Budget Monitoring 2024/2025 
A joint report dated 14 July 2025 by the Executive Directors (Finance and Corporate Resources)
and (Community and Enterprise Resources) was submitted advising of progress on the
Community and Enterprise Resources’ capital programme 2024/2025 and summarising the
expenditure position at 31 March 2025.
6

Page 7

The total capital programme for 2024/2025 for the Resource amounted to £47.364 million. 
Expenditure to 31 March 2025 was £35.448 million which reflected an underspend of £11.916
million.  The underspend was mainly due to the timing of spend across financial years, with the
main projects responsible for the underspend detailed at Appendix B of the report.  Any
underspend on those projects, including the funding, would be carried forward into the next
financial year, as required. 
Information was also provided on accounting adjustments. 
The Committee decided: that the Community and Enterprise Resources’ capital
programme of £47,364 million, and expenditure for the year
of £35.448 million, be noted. 
[Reference: Minutes of 13 May 2025 (Paragraph 4) and Minutes of the Executive Committee of
25 June 2024 (Paragraph 6)] 
6 Community and Enterprise Resources - Capital Budget Monitoring 2025/2026 
A joint report dated 14 July 2025 by the Executive Directors (Finance and Corporate Resources)
and (Community and Enterprise Resources) was submitted advising of progress on the
Community and Enterprise Resources’ capital programme 2025/2026 and summarising the
expenditure position at 16 May 2025. 
The capital programme for 2025/2026 for the Resource amounted to £50.793 million and was
based on the programme of projects approved by Council on 26 February 2025, updated to
include budget carried forward from financial year 2024/2025 and adjustments approved by the
Executive Committee on 25 June 2025, as detailed in Appendix A to the report. 
Appendix A also provided a forecast for the financial year of £50.793 million and actual
expenditure to 16 May 2025 of £0.181 million. 
The Committee decided: that the Community and Enterprise Resources’ capital
programme of £50.793 million, and expenditure to date of
£0.181 million, be noted. 
[Reference: Minutes of South Lanarkshire Council of 26 February 2025 (Paragraph 3) and
minutes of the Executive Committee of 25 June 2025 (Paragraph 6)] 
7 Community and Enterprise Resources - Workforce Monitoring – 1 March to 31
May 2025 
A joint report dated 12 June 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period 1 March to 31
May 2025:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 8 March 2025
7

Page 8

In response to a member’s question in relation to vacancies and the actions being taken in this
area, the HR Business Manager advised that the Resource Workforce Plan was due to be
submitted to the next meeting of the Committee which would provide more information on this. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 13 May 2025 (Paragraph 5)] 
Councillor Kerr joined the meeting during this item of business 
8 Community and Enterprise Resource Plan – Quarter 4 Progress Report 2024/2025 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the Community and Enterprise Resource Plan Quarter 4 Progress Report
2024/2025 for the period 1 April 2024 to 31 March 2025. 
The Resource Plan measures were rated using a traffic light system of red, amber or green as
well as blue (BRAG) which indicated that an action had been completed. 
Details were provided on:- 
 progress made in implementing the priority projects identified in the Resource Plan Quarter
4 2024/2025, as detailed in Section 5.2 and attached as Appendix 2 to the report
 key achievements made by the Resource to date, as detailed in Section 5.3 of the report
 areas for improvement and associated management actions, as detailed in Section 5.4 of
the report
 measures which had changed from Quarter 2 to Quarter 4, as detailed in Appendix 3 to the
report 
Officers responded to members’ questions on various aspects of the report and advised that it
was intended to bring a report to:- 
 the next meeting of the Committee on both Calderglen and Chaterherault Country Park
masterplans
 an appropriate committee on the Visitor Levy 
The Committee decided: 
(1) that the Community and Enterprise Resource Plan Quarter 4 Progress Report 2024/2025,
as summarised in paragraph 5.2 and attached as Appendix 2 to the report, be noted; 
(2) that the key achievements made by the Resource up to Quarter 4, as detailed at
paragraph 5.3 of the report, be noted; 
(3) that areas for improvement and associated management actions, as detailed at paragraph
5.4 of the report, be noted; and 
(4) that the additional scrutiny of changes in measures between Quarter 2 and Quarter 4, as
summarised at paragraph 5.5 and detailed at Appendix 3 of the report, be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 6)] 
Councillor Brogan joined the meeting during this item of business 
8

Page 9

9 Primary School Expansion of Free School Meals – Scottish Child Payment 
A joint report dated 23 July 2025 by the Executive Directors (Community and Enterprise
Resources) and (Finance and Corporate Resources) was submitted:- 
 providing an update on the expansion of free school meals for eligible primary school
children entitled to the Scottish Child Payment (SCP) provided by the Scottish Government
 seeking approval to increase the establishment of Facilities Services’ employees on a
permanent basis to support and promote this expansion 
In 2025/2026, the Scottish Government provided £37 million to assist with the costs of the next
phase of the free school meals programme, as outlined in the report.  This included an
additional £15 million for 2025/2026 for primary 6 and 7 pupils in receipt of SCP.  Data received
from Social Security Scotland advised that 1,728 primary 6 and 7 pupils would be eligible for
free school meals aligned to the SCP in South Lanarkshire. 
Information was provided on the progress to date and it was proposed that, to support the
expansion, the following permanent posts be added to the establishment:- 
 8 posts of Catering Assistant (Term Time) (2.16 Full-time Equivalent (FTE)) on Grade 1,
Level 1, SCP 20 (£24,732)
 2 posts of Assistant Cook in Charge (Term Time) (1.62 FTE) on Grade 1, Level 2, SCP 22-
23 (£25,311 to £25,581)
 3 FTE posts of Assistant Facilities Officer on Grade 2, Level 2, SCP 39-40 (£30,674 to
£31,060) 
The costs of the proposals would be met from the £2.184 million revenue funding received over
the past 3 financial years to deliver the free school meal expansion programme, with the total
cost of additional staffing of £0.212 million being met by additional revenue funding received
from the Scottish Government. 
The Committee decided: 
(1) that the update on the expansion of free school meals for eligible primary school children
entitled to the Scottish Child payment be noted; and 
(2) that the permanent increase to the staffing establishment to support the expansion, as
detailed in the report, be approved. 
10 Packaging Extended Producer Responsibility (pEPR) Funding and Waste
Investment 
A report dated 24 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted:- 
 providing an update on the packaging extended producer responsibility scheme (pEPR)
 advising of the scope of the pEPR payments, assessment process and potential future
implications for the Council
 outlining a proposal to use a proportion of the 2025/2026 pEPR payment to establish a
dedicated team with a remit to improve household waste management services in South
Lanarkshire 
Sustainable waste management practices were an integral part of the Scottish Government’s
goal to move towards a more Circular Economy.  To facilitate the change required to meet the
Circular Economy goals, the Scottish and UK Governments were in the process of implementing
new policies and legislation aimed at driving improvement in waste management.
9

Page 10

The pEPR scheme was being managed across the UK by the Department of Environment, Food
and Rural Affairs (Defra) and the aim of the scheme was to ensure that producers paid for the
collection and disposal of all packaging materials they put on the market.  The pEPR payment to
the Council for 2025/2026 would be £7.716 million. 
Given the scale and complexity of the service changes required, it was proposed that a new
team, with a strategic remit for waste, be established on a permanent basis, as follows:- 
 1 Full-time Equivalent (FTE) post of Waste Strategy Adviser on Grade 4, Level 2-5, SCP
82-88 (£50,878 to £55,659)
 2 FTE posts of Waste Strategy Officer on Grade 3, Level 2-4, SCP 63-74 (£39,235 to
£45,184)
 2 FTE posts of Waste Strategy Assistant on Grade 2, Level 1-3, SCP 34-48 (£27,245 to
£31,954)
 0.5 FTE post of Accountant on Grade 3, Level 2-8, SCP 63-80 (£39,235 to £49,400) 
The costs of the proposals would be met from the 2-year pEPR funding, with any future
recurring funding being considered as part of the revenue budget strategy process. 
Officers responded to members’ questions in relation to various aspects of the report. 
The Committee decided: 
(1) that the update on the packaging extended producer responsibility scheme (pEPR) be
noted; 
(2) that the proposal to utilise £0.610 million of the 2025/2026 pEPR funding to establish a
dedicated team, funded for 2 years, to improve household waste management services, as
detailed in the report, be approved; and 
(3) to note that the financial implications, referred to at paragraphs 8.2 and 8.3 of the report,
would be considered as part of the 2025/2026 Revenue Budget Monitoring report to the
Executive Committee on 27 August 2025. 
[Reference: Minutes of 25 February 2025 (Paragraph 8)] 
Councillor Nugent left the meeting during this item of business 
11 Hamilton Town Centre Masterplan Update 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the:- 
 progress of the Hamilton Town Centre Masterplan
 potential surrender of the Regent Shopping Centre ground lease
 outline projects being scoped for the first stage of investment in Hamilton Town Centre 
Information was provided on the:- 
 challenges faced by Hamilton Town Centre
 progress of various aspects of the Masterplan
 first stage of investment based around a ‘Town Centre First’ programme of works
10

Page 11

With the sale of the Regent Shopping Centre now concluded, the new owner was seeking the
surrender of the ground lease from the Council in order to deliver the next phase of the
Masterplan.  The surrender of the lease would be essential to the delivery of the Masterplan
vision and officers were carrying out the appropriate valuations and legal work.  A further report
on this would be submitted to the Executive Committee and Community and Enterprise
Resources Committee in due course. 
It was highlighted that, as some of the Council-owned assets identified for development as part
of the Masterplan had been purchased using Common Good funding, the legal and financial
implications were being fully considered and this might add a time value to the Masterplan
delivery. 
The Economic Development Manager responded to a member’s questions in relation to various
aspects of the report. 
The Committee decided: 
(1) that the update on the work on the Hamilton Town Centre Masterplan delivery be noted; 
(2) that the request for the potential surrender of the ground lease on Regent Shopping Centre
to facilitate delivery of the Masterplan be noted; and 
(3) that the projects scoped for the first stage of investment in the Masterplan, as detailed at
paragraph 5.1. of the report, be approved. 
[Reference: Minutes of the Executive Committee of 21 February 2024 (Paragraph 6)] 
12 Scottish Government Vacant and Derelict Land Fund Programme 2025/2026 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the progress made in delivering the Scottish Government Vacant and Derelict
Land Fund (VDLF) Programme for 2024/2025 in South Lanarkshire and the proposed
Programme for 2025/2026. 
The Scottish Government had allocated £425,000 to the Council for the VDLF in 2024/2025 and
a Local Delivery Plan had been approved by the Committee on 26 November 2024 to implement
the following key objectives:- 
 tackle long-term vacant and derelict land
 stimulate economic growth and job creation
 develop a diverse sustainable environment with a focus on temporary and permanent
greening
 support communities to flourish and tackle inequalities 
Details were provided on the progress achieved in 2024/2025. 
The Scottish Government allocation to South Lanarkshire for the VDLF in 2025/2026 was
£528,000.  The following projects, which complied with the eligibility criteria for the fund, were
proposed:- 
 Clyde Cycle Park Phase 2 - £400,000
 Clyde Climate Forest - £25,000 
Projects were being identified for the balance of the 2025/2026 VDLF of £103,000 which would
be submitted to a future meeting of the Committee for consideration.
11

Page 12

The Committee decided: 
(1) that the progress made in delivering the agreed Vacant and Derelict Land Fund
Programme 2024/2025 in South Lanarkshire be noted; and 
(2) that the allocation of funds in the 2025/2026 Vacant and Derelict Land Fund Delivery Plan,
as set out in paragraphs 5.1 and 5.2 of the report, be approved. 
[Reference: Minutes of 26 November 2024 (Paragraph 8)] 
Prior to consideration of this item of business, Councillor Devlin made a transparency statement to
advise that she was a member of the Clyde Cycle Park Board 
13 Revocation of Whirlies (East Kilbride) and Rutherglen Air Quality Management
Areas – South Lanarkshire 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the improvements of air quality within Whirlies (East
Kilbride) and Rutherglen areas and the proposed revocation of the Air Quality Management
Areas (AQMAs). 
The Council had a statutory duty to monitor the quality of air within its area.  This was defined in
the Environment Act 1995 as well as within the Air Quality (Scotland) Regulations 2000 and
2002 as amended.  Monitoring results had to be considered against air quality objectives/targets
and, should those be exceeded, the local authority had to take action to improve the air quality. 
Levels had previously been exceeded in East Kilbride, Rutherglen and Lanark which had
resulted in the declaration of 3 AQMAs.  The Lanark AQMA was revoked in 2023. 
Information was provided on:- 
 the air quality improvement action taken specific to each area and across South
Lanarkshire
 the current position at the Whirlies (East Kilbride) and Rutherglen areas, with the air quality
monitoring data detailed in the AQMA Revocation Reports attached as appendices 1 and 2
to the report respectively
 the 2024 Air Quality Annual Progress Report for South Lanarkshire Council, which had
been submitted to, and accepted by, the Scottish Government and the Scottish
Environmental Protection Agency (SEPA), together with the Revocation Reports for both
AQMAs 
In view of the conclusions of the Revocation Reports and acceptance of the findings by the
Scottish Government and SEPA, it was proposed that both AQMAs be revoked.  If approved,
the Revocation Order would be drawn up in conjunction with Legal Services and the Order
advertised with statutory consultees prior to the Order coming into effect in October 2025. 
Where a Revocation Order was accepted, a local authority was expected to develop a Local Air
Quality Strategy to ensure air quality maintained a high profile locally and to respond to public
expectations.  Planning and Regulatory Services had developed a draft Air Quality Strategy and
intended to fully adopt the Strategy in 2026, following consultation. 
Air quality monitoring across the existing automatic air stations would continue for a minimum of
3 years following revocation of the AQMAs and this would be reported through the Annual
Progress Report to the Scottish Government and SEPA.
12

Page 13

The Committee decided: that the Whirlies (East Kilbride) and Rutherglen AQMAs be
revoked. 
[Reference: Minutes of the Community Resources Committee of 11 November 2008
(Paragraph 8) and Minutes of the Community Services Committee of 8 December
2015 (Paragraph 7)] 
14 Approval of South Lanarkshire Council’s Food Service Plan for 2025/2026 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the Council’s Food Service Plan for 2025/2026. 
Information was provided on the statutory duties placed on local authorities in relation to food,
which involved:- 
 carrying out official controls including inspections, audits, monitoring, surveillance or
sampling in food establishments
 ensuring that the statutory obligations were brought to the attention of local authority
officials and/or elected member bodies responsible for agreeing budgets or other service
arrangements relevant to the delivery of official controls
 completing an annual Service Plan which detailed the programme for the year, ensuring it
was adequately resourced and approved at the appropriate governance level within the
local authority 
The Council’s Food Service Plan for 2025/2026 was attached as Appendix 1 to the report. 
The Committee decided: that the Council’s Food Service Plan for 2025/2026, as
detailed in Appendix 1 to the report, be approved. 
[Reference: Minutes of 17 September 2024 (Paragraph 11)] 
15 Renewable Energy Fund – Mill Rig Windfarm Contributions 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the:- 
 development of the Mill Rig Windfarm site
 proposals for the associated community benefit payments from the windfarm site to be
managed through the Renewable Energy Fund (REF) 
As part of the developments, the Council would receive community benefit payments for
distribution to projects associated with the windfarm site.  It was proposed that the arrangements
in place for the distribution of funds through the existing REFs be used as the basis for the
administration of the Mill Rig Windfarm site. 
The eligible areas were shown in the appendix to the report and the criteria to regulate the
distribution of funds through the REF for the windfarm site grants were detailed. 
The Committee decided: that the Council’s Renewable Energy Fund incorporate
provision for the receipt and disbursement of community
benefit payments in respect of the Mill Rig Windfarm site. 
Councillor Convery left the meeting during this item of business
13

Page 14

16 Community Benefit Funds – Renewable Energy Fund – Grant Applications 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on 2 applications to the Renewable Energy Fund (REF).  This community benefit
funding, secured from windfarm developers, had been established to provide funding to suitable
projects providing community benefits in eligible areas. 
It was proposed that, subject to the applicants providing written confirmation that all other
additional funding for the projects had been secured, grants be awarded as detailed in the
report. 
The Committee decided: that, subject to the applicants providing written confirmation
that all other funding for the projects had been secured, a
grant be awarded of up to a maximum of:- 
 £35,100 towards eligible costs associated with the
appointment of consultants to Douglas Community
Development Company from Gallawhistle Windfarm
 £155,892 towards eligible costs associated with the
purchase of course maintenance equipment to
Hollandbush Golf Club from Gallawhistle Windfarm 
[Reference: Minutes of 13 May 2025 (Paragraph 8)] 
17 Overtoun Bandstand Restoration 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted advising of the restoration of the Overtoun Bandstand in Overtoun Park,
Rutherglen. 
The Overtoun Bandstand was a B-listed structure erected in 1914.  On 1 June 2024, the
structure sustained significant damage caused by a fire.  In February 2025, an allocation of
£300,000 from the Council budget was approved for the repair and restoration of the Bandstand
in time for the Royal Burgh’s 900th anniversary celebrations in 2026.  The Council also intended
to apply for external funding from Historical Environment Scotland, as outlined in the report. 
Due to the Bandstand’s historic significance, great care was required to ensure the restoration
preserved the original character and features and the Council would work closely with heritage
experts and conservation specialists to guide the repair process. 
Information was provided on the progress of the project and timeline for completion, with the
intention that the newly restored Bandstand would feature in the Rutherglen 900 calendar of
events. 
A community consultation was underway to seek views on the restoration and future use of the
Bandstand. 
Officers responded to a member’s questions in relation to the external funding application. 
The Committee decided: 
(1) that the Council’s commitment to restoring Overtoun Bandstand following wilful fire
damage in June 2024 be noted; 
(2) that the project aim of delivering the Bandstand in line with the Rutherglen 900 event
calendar be noted;
14

Page 15

(3) that the aim of the community consultation be noted; and 
(4) that the timeline and application criteria for external funding from Historic Environment
Scotland be noted. 
Prior to consideration of this item of business, Councillors Brown, Cowan and Cowie made
transparency statements to advise that they had been involved with Rutherglen 900 
Councillor Watson left the meeting during this item of business 
18 Clyde Metro Update 
A report dated 4 August 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the progress of the Clyde Metro Case for Investment
(CFI) programme by the project partners. 
The delivery of Clyde Metro was a collaborative project.  The Case for Investment (CFI) for
Clyde Metro was being led by Strathclyde Partnership for Transport (SPT), with support from
Glasgow City Council, acting as a representative for the Glasgow City Region (GCR).  Transport
Scotland was acting in a project assurance role and senior officers from the Council were
actively engaged in the Clyde Metro Senior Officers’ Group.  This was to ensure that the Council
influenced the development of the project and remained informed on progress. 
Information was provided on:- 
 the CFI work packages, which incorporated the following stages:-
 Stage 1a – Case for Change and Initial Options Development
 Stage 1b – Client Advisory Services
 Clyde Metro Framework
 Stage 2 – Programme Business Case
 progress to date in relation to Stage 1
 the preparation for the commencement of Stage 2
 stakeholder engagement 
The Head of Roads, Transportation and Fleet Services responded to members’ questions in
relation to the representation of South Lanarkshire’s interests in the project. 
The Committee decided: that the progress of the Clyde Metro Case for Investment
programme be noted. 
Councillor McLachlan left the meeting during this item of business 
19 Strathclyde Regional Bus Strategy – Recommendations for Future Delivery of the
Regional Bus Network Update 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted:- 
 providing an update on the development of the Strathclyde Regional Bus Strategy (SRBS)
 detailing the Council’s response to the Strathclyde Partnership for Transport’s (SPT’s)
SRBS consultation
15

Page 16

New provisions to improve bus services were introduced by the Transport (Scotland) Act 2019. 
The new provisions allowed Local Transport Authorities, in accordance with relevant guidance
and regulations, to develop Bus Service Improvement Partnerships in partnership with bus
operators, to develop and manage a bus franchise and to establish a new municipal bus
company to directly operate bus services. 
At its meeting on 8 May 2024, the Executive Committee approved a report which would form the
content of the Council’s response to the SRBS consultation.  The SRBS would be SPT’s
process to investigate the use of provisions and determine a preferred strategy to improve the
bus network in the region.  The consultation response, which had been submitted on 29 May
2025, was attached as Appendix 1 to the report. 
The Committee decided: that the response to the Strathclyde Partnership for
Transport (SPT) Strathclyde Regional Bus Strategy
consultation, submitted on 29 May 2025 and attached as
Appendix 1, be noted. 
[Reference: Minutes of the Executive Committee of 8 May 2024 (Paragraph 10)] 
Councillor Falconer left the meeting during this item of business 
20 Community and Enterprise Resources – Notification of Contracts Awarded – 10
October 2024 to 31 March 2025 
A report dated 23 July 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on contracts awarded by Community and Enterprise Resources in the period 10
October 2024 to 31 March 2025. 
In terms of Standing Order Nos 21.8 and 22.5 of the Standing Orders on Contracts, Resources
were required to notify the relevant Committee of contracts awarded above the sum of £50,000. 
Details of the contracts awarded or extended were provided in Appendix 1 to the report. 
The Committee decided: that the details of the contracts awarded or extended, as
detailed in Appendix 1 to the report, be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 18)] 
21 Urgent Business 
There were no items of urgent business. 
16

Page 17

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 8 August 2025 for Community and Enterprise
Resources
 provide a forecast for the year to 31 March 2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the forecast to 31 March 2026 of a breakeven position, as detailed in
Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Community and
Enterprise Committee for the financial year 2025/2026. 
3.2. The report details the financial position for Community and Enterprise Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendices B to G provides the detailed financial
position with variance explanations by budget category. 
3.3. This report reflects the actual spend to 8 August 2025 within the Resource budget and
reflects the expected outturn forecast on expenditure and income at this date.   
4. Employee Implications
4.1. None.   
5. Financial Implications
5.1. As at 8 August 2025, the Resource’s projected outturn position for 2025/2026 is a
breakeven position.  This is outlined in the attached appendices.    
3
17

Page 18

5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however these are mitigated by additional funds being added to the
budget. 
7.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate.   
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director, (Community and Enterprise Resources) 
3 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Louise Harvey, Finance Manager
Ext:  2658 (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
18

Page 19

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 5 Ended 8 August 2026 (No.5) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Facilities, Waste and Grounds Services  85,378  85,112 266 0.31% 21,764
Planning and Regulatory Services 5,223 5,100 123 2.35% 1,412
Leisure Services 20,090 20,090 0 0.00% 8,464
Enterprise and Sustainable Development 6,556 6,394 162 2.47% 2,656
Roads, Transportation and Fleet Services 19,303 19,854 (551) -2.85% 5,639
Net Controllable Exp. 136,550 136,550 0 0.00% 39,935 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by overspends
within Property rates, increased costs for cleaning & janitorial equipment and repairs and an under
recovery within Bereavement and Private Care of Garden income. The anticipated Service underspend
will support other areas of the Resource budget.   
Planning and
Regulatory Services
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by small
overspends within IT costs and Transport. The anticipated Service underspend will support other areas
of the Resource budget.   
Leisure Services No significant variances to report.
Enterprise and
Sustainable
Development
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by a small
overspends within Financing IT costs. The anticipated Service underspend will support other areas of
the Resource budget 
Roads,
Transportation and
Fleet Services
The anticipated overspend is mainly due to an under recovery of income in respect of Parking and
Electrical Vehicles, overspends on the upkeep of the Roads depots and IT computer licences within
Roads. These overspends are partially offset by turnover and staff vacancies. This service overspend
is offset by underspend within the other services bringing the overall Resource outturn to a balanced
position. 
19

Page 20

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 108,322 106,431 1,891 Under 1.75% 33,955 
Property Costs 8,901 9,193 (292) Over (3.28%) 1,815 
Supplies & Services 18,383 18,780 (397) Over (2.16%) 4,987 
Transport & Plant 22,506 22,668 (162) Over (0.72%) 8,086 
Administration Costs 878 1,008 (130) Over (14.81%) 191 
Payments to Other Bodies 15,582 15,583 (1)    Over (0.01%) 3,925 
Payments to Contractors 39,280 39,330 (50) Over (0.13%) 13,641 
Transfer Payments 617 617 0 - 0.00% 312 
Financing Charges 192 212 (20)     Over  (10.42%) 0 
Total Controllable Exp. 214,661 213,822 839 Under 0.39% 66,912 
Total Controllable Inc. (78,111) (77,272) (839) Under (0.98%) (26,977) 
Net Controllable Exp. 136,550 136,550 0 - 0.00% 39,935 
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
20

Page 21

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 69,028 67,954 1,074 Under 1.56% 21,861 1,a,b
Property Costs 2,277 2,528  (251)  Over (11.02%) 474 2,a
Supplies & Services 9,602 9,888 (286) Over (2.98%) 2,601 3,a,b
Transport & Plant 8,117 8,217 (100) Over (1.23%) 3,330 4,b
Administration Costs 248 330 (82) Over (33.06%) 75 5,a,b
Payments to Other Bodies 254 255 (1) Over (0.39%) 40 b
Payments to Contractors 19,824 19,824 0 - 0.00% 4,915 b
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 45 45 0 - 0.00% 0 
Total Controllable Exp. 109,395 109,041 354 Under 0.32% 33,296 
Total Controllable Inc. (24,017) (23,929) (88) Under 0.28% (11,532) 6,b
Net Controllable Exp. 85,378 85,112 266 Under 0.34% 21,764 
Variance Explanations 
1. The forecast underspend is across all service areas and is due to staff turnover, partially offset by an overspend in overtime.
2. The forecast overspend is due to price increases for cleaning and janitorial equipment within Facilities and an overspend on rates
within Waste associated with Muttonhole Road. 
3. The forecast overspend is due to higher than budgeted costs for the purchase and repair of equipment within Facilities, general
materials, bins and protective clothing throughout the services. 
4. The forecast overspend is mainly due to increased costs for vehicle maintenance and external hires within Waste.  
5. The forecast overspend is due to printing costs for menu development, medicals and fees in relation to parent pay.
6. The forecast under recovery is mainly due to a reduced demand for private Care of Gardens service within Grounds and reduced
income within the Bereavement Services, partially offset by a higher than forecast demand for the Garden Waste Uplift Service. 
Budget Virements 
a. Transfer between corporate items in relation to pay award, AVC NI Saving, Increase in National Insurance Rates, Waste RPI and
Utilities 2025/2026. Net effect £4.579m: Employees £4.430m, Property (£0.032m), Transport and Plant £0.001m, Payment to
Contractor £0.180m.
b. Establishment of temporary budgets in respect of investment monies, Fly tipping, Local Action Fund, Nature Restoration Fund, Ash
Dye Back and Front Line First. Net Effect £1.684m: Employees £1.390m, Supplies and Services £0.314m, Transport and Plant
(£0.030m), Administration (£0.050m), Payment to Other Bodies £0.200m, Payment to Contractors £0.030m, Income (£0.170m). 
21

Page 22

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
Planning and Regulatory Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7,758 7,594 164 Under 2.11% 2,517 1,a
Property Costs 38 25 13 Under 34.21% 2 
Supplies & Services 161 182 (21) Over (13.04%) 114 
Transport & Plant 126 144 (18) Over (14.29%) 29 
Administration Costs 111 111 0 - 0.00% 37 
Payments to Other Bodies 233 233 0 - 0.00% 58 b
Payments to Contractors 443 458 (15) Over (3.39%) 204 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 46 46 0 - 0.00% 0 
Total Controllable Exp. 8,916 8,793 123 Under 1.38% 2,961 
Total Controllable Inc. (3,693) (3,693 0 - 0.00% (1,549) 
Net Controllable Exp. 5,223 5,100 123 Under 2.35% 1,412 
Variance Explanations 
1. The forecast underspend is due to staff vacancies and turnover. 
Budget Virements  
a. Transfer between corporate items in relation to pay award, AVC NI Saving and Increase in National Insurance Rates. Net effect
£0.440m: 
Employees £0.440m.
b. Removal of budget in respect of Credit Safe to Finance & Corporate Resources. (£0.002m): Payment to Other Bodies (£0.002m). 
22

Page 23

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 4 4 0 - 0.00% 2 
Property Costs 4,615 4,615 0 - 0.00% 909 b
Supplies & Services 0 0 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 8 8 0 - 0.00% 3 
Payments to Other Bodies 80 80 0 - 0.00% 0 
Payments to Contractors 15,383 15,383 0 - 0.00% 7,550 a,b
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 0 0 0 - 0.00% 0 
Total Controllable Exp. 20,090 20,090 0 - 0.00% 8,464 
Total Controllable Inc. 0 0 0 - 0.00% 0 
Net Controllable Exp. 20,090 20,090 0 - 0.00% 8,464 
Variance Explanations 
No variances to report. 
Budget Virements 
a. Transfer between corporate items and reserves in relation to Leisure Management Fee and Community Fight Back Fund.              
Net effect £0.302m: Payment to Contractor £0.302m.
b. Realignment of budget to reflect anticipated expenditure in respect of utilities and Management Fees. £0.000m: Property £4.517m,
Payment to Contractors (£4.517m). 
23

Page 24

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 9,855 9,674 181 Under 1.84% 2,904 1,a,c
Property Costs 288 287 1 Under 0.35% 25 c
Supplies & Services 146 146 0 - 0.00% 6 
Transport & Plant 353 353 0 - 0.00% 80 
Administration Costs 113 113 0 - 0.00% 13 
Payments to Other Bodies 9,491 9,491 0 - 0.00% 1,026 a,b,c
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 51 71 (20) Over (39.22%) 0 2
Total Controllable Exp. 20,297 20,135 162 Under 0.80% 4,054 
Total Controllable Inc. (13,741) (13,741) 0 - 0.00% (1,398) b,c
Net Controllable Exp. 6,556 6,394 162 Under 2.47% 2,656 
Variance Explanations 
1. The forecast underspend is due to staff vacancies and turnover.
2. The forecast overspend is due higher than budgeted costs for IT leasing within the Support service. 
Budget Virements 
a. Transfer between corporate items in relation to pay award, AVC NI Saving, Increase in National Insurance Rates, Utilities and
Rutherglen 900th Year. Net effect £0.416m: Employees £0.352m, Payment to Other Bodies £0.064m.
b. Transfer from Reserves in respect of Climate and Food Fund and Business Support. Net Effect £0.316m: Payment to Other Bodies
£0.128m, Income £0.188m.
c. Establishment of temporary budgets in respect of Business Initiatives, Town Centre Regeneration, Country Parks, Expert Help,
Investment Initiatives and Palace Grounds. Net effect £0.000m: Employees £0.380m, Property £0.026m, Payment to Other Bodies
£0.261m, Income (£0.667m). 
24

Page 25

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 8 August 2025 (No.5) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 21,677 21,205 472 Under 2.18% 6,671 1,a
Property Costs 1,683 1,738 (55) Over (3.27%) 405 2,a
Supplies & Services 8,474 8,564 (90) Over (1.06%) 2,266 3,a
Transport & Plant 13,910 13,954 (44) Over (0.32%) 4,647 4,a,b
Administration Costs 398 446 (48) Over (12.06%) 63 5
Payments to Other Bodies 5,524 5,524 0 - 0.00% 2,801 a
Payments to Contractors 3,630 3,665 (35) Over (0.96%) 972 6,b
Transfer Payments 617 617 0 - 0.00% 312 
Financing Charges 50 50 0 - 0.00% 0 
Total Controllable Exp. 55,963 55,763 200 Under 0.36% 18,137 
Total Controllable Inc. (36,660) (35,909) (751) Under 2.05% (12,498) 7,a,b
Net Controllable Exp. 19,303 19,854 (551)    Over (2.85%) 5,639 
Variance Explanations 
1. The forecast underspend is due to vacancies and staff turnover.
2. The forecast overspend is due to higher than budgeted running costs and repairs for depots.
3. The forecast overspend mainly relates to increased costs for annual subscriptions for computer licences within Roads.
4. The forecast overspend is due to increased costs in relation to the Passenger Services Agreement.
5. The forecast overspend is due to higher than budgeted costs for medicals, member subscriptions and training across the service.
6. The forecast overspend is mainly due to higher than budgeted costs for bridge statutory inspections and increased contractor costs
for maintenance of traffic lights.
7. The anticipated under recovery is due to less than budgeted income for parking & electric vehicles within Roads. 
Budget Virements 
a. Transfer between corporate items in relation to pay award including Passenger Service Assistance, AVC NI Saving, Increase in
National Insurance Rates, Utilities and Scottish Passenger Transport. Net effect £1.134m: Employees £1.204m, Property (£0.017m),
Supplies and Services (£0.130m), Transport and Plant (£0.146m), Payment to Other Bodies £0.046m, Income £0.177m.
b. Realignment of budget to reflect anticipated expenditure in respect of Roads Lighting and Fleet Fuel. £0.000m: Transport and Plant
(£0.137m), Payment to Contractor £0.012m, Income £0.125m. 
25

Page 26

26

Page 27

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April to 8 August 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources capital programme of £57.467
million, and forecast expenditure of £57.419 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2025/2026. Further reports will
follow throughout the year. 
3.2. The revised budget of £57.467 million for Community and Enterprise Resources is
based on the overall Capital Programme for 2025/2026 (Executive Committee, 25
June 2025), and includes updates approved by the Executive Committee 27 August
2025 and 24 September 2025. 
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2025/2026 Budget   
As detailed in Section 3.2, the revised capital programme for Community and
Enterprise Resources for 2025/2026 is £57.467 million and includes budget
adjustments, totalling a net increase of £6.673 million, which have been approved by
the Executive Committee.  The details of these amendments are shown in Appendix
A.  
4
27

Page 28

5.2. 2025/2026 Forecast 
Appendix A also shows a forecast for the financial year of £57.419 million based on
profiled spend, a minor variance in outturn (£0.048 million) reflecting the most up to
date profile of spend. 
5.3. For information, actual expenditure incurred to 8 August 2025 is £6.050 million. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Community and Enterprise Resources Committee, 12 August 2025
 Executive Committee, 25 June 2025
 Executive Committee, 27 August 2025
 Executive Committee, 24 September 2025 
List of Background Papers
▪ Financial ledger to 8 August 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
28

Page 29

Appendix A
South Lanarkshire Council Capital Expenditure 2025-2026
Community and Enterprise Resources Programme
For Period 1 April 2025 – 8 August 2025
Community & Enterprise Base
Budget 
£000
Budget
Adjustments
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000 
Facilities, Waste and Grounds  3,124  460  0  3,584  3,584  0  314 
Enterprise and Sustainable
Development 
24,062  8,630  (2,020)  30,672  30,624  48  2,247 
Roads, Transport and Fleet  20,489  2,722  0  23,211  23,211  0  3,489 
TOTAL  47,675  11,812  (2,020)  57,467  57,419  48  6,050   
For Information Only   
Budget Adjustments approved by Executive Committee, 
27 August 2025: 
Budget Adjustments approved by Executive Committee, 
24 September 2025: 
Budget Adjustments 
Braidwood Play Area Redevelopment 
Wooddean Phase 2
City Deal Monitoring Fees
SLC Industrial Infrastructure – Energy Efficiency (Cathcart Road)
Leisure and Culture Transformation Fund
2025/2026 Place Based Investment Fund 
Civic Centre/EK Town Centre Masterplan
People and Place Local Authority Grant
SPT Regional Congestion Reduction Measure
City Deal – Greenhills Road
Clyde Climate Forrest (VDLF) 
Total Budget Adjustments 
£0.123m
£0.146m
(£0.159m)
(£0.590m)
£2.983m
£1.213m
(£1.213m)
£2.117m
£0.210m
£0.250m
£0.270m
£0.025m 
£5.375m 
Budget Adjustments 
Bus Infrastructure Fund
Road Safety Improvement Fund
Cycling Scotland Grant Award 
Total Budget Adjustments 
£0.648m
£0.550m
£0.100m 
£1.298m 
29

Page 30

30

Page 31

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – June and July 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for June and July 2025 relating to Community
and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for June and July 2025 relating to
Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 June 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee. This report for Community and
Enterprise Resources provides information on the position for June and July 2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of July 2025 for
Community and Enterprise Resources. 
The Resource absence figure for July 2025 was 5.5%, this figure has decreased by
1.3% when compared to the previous month and is 1.2% higher than the Council-
wide figure. When compared to July 2024, the Resource absence figure has
increased by 1.1%. 
Based on the absence figures at July 2025 and annual trends, the projected annual
average absence for the Resource for 2025/2026 is 6.9%, compared to a Council-
wide average figure of 6.0%.
5
31

Page 32

Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 192 referrals were made this period. This
represents a decrease of 1 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2)
There were 28 accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 11 disciplinary hearings were held within the Resource, this is a
decrease of 9 when compared to the same period last year.  No appeals were heard
by the Resource, this figure has decreased by 1 when compared to the same period
last year. One grievance was raised within the Resource; this figure is unchanged
when compared to the same period last year. Two Dignity at Work complaints were
raised within the Resource, this figure also remains unchanged when compared to
the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 13 leavers this period eligible for an exit interview. The number
of leavers has decreased by 7, when compared with the same period last year.
During the period 3 exit interviews were conducted, this figure has increased by 2
when compared to the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been an increase of 36 employees in post from 8 March 2025 to 14 June
2025.   
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required.
32

Page 33

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
28 August 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 12 August 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
33

Page 34

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 3.6 June 5.9 6.4 7.4 June 5.7 6.0 6.8 June 4.7 5.2 5.4
July 2.3 3.8 3.6 July 4.6 4.5 5.9 July 4.3 4.4 5.5 July 3.8 4.1 4.3
August 3.0 3.4 August 5.2 6.2 August 4.9 5.7 August 4.1 4.7
September 2.5 3.8 September 7.1 7.5 September 6.4 6.9 September 5.3 6.1
October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0
November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9
December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.6 Annual Average 6.8 7.2 7.5 Annual Average 6.2 6.6 6.9 Annual Average 5.4 5.9 6.0
Average Apr-Jul 3.5 3.6 3.3 Average Apr-Jul 5.8 6.0 7.0 Average Apr-Jul 5.5 5.7 6.4 Average Apr-Jul 4.7 5.0 5.3
582 2830 3412 15573
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 31 July 2025 No of Employees at 31 July 2025 No of Employees at 31 July 2025 No of Employees at 31 July 2025
34

Page 35

Jun - Jul Jun - Jul
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 56 47
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 1 0
TOTAL 193 192
Jun - Jul Jun - Jul
2024 2025
Specified Injuries* 2 0
Over 7 day absences 3 0
Over 3 day absences** 2 0
Minor 26 12
Near Miss *** 1 5
Violent Incident:  Physical**** 2 10
Violent Incident:  Verbal***** 4 1
Total Accidents/Incidents 40 28
Jun - Jul Jun - Jul
2024 2025
Total Number of Hearings 20 11
Total Number of Appeals 1 0
Time Taken to Convene Hearing - Jun to Jul 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
3 5 3
Jun - Jul Jun - Jul
2024 2025
Number of Grievances 1 1
Number Resolved at Stage 2 1 0
Still in Progress 0 1
Jun - Jul Jun - Jul
2024 2
Number of Incidents 2 2
Still in Process 2 2
RECORD OF DIGNITY AT WORK
71 73
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
0 4
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
65 68
35

Page 36

Jun - Jul Jun - Jul
2024 2025
Career Advancement 1 1
Child Caring / Caring Responsibilities 0 3
Further Education 0 1
Personal Reasons 0 5
Other 19 3
Total Number of Leavers Eligible for Exit Interview 20 13
Number of Exit Interviews conducted 1 3
Percentage of interviews conducted 5% 23%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
36

Page 37

As at 14 June 2025
Total Number of Employees
F/T P/T F/T P/T
1246 351 238 1552
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1697.99 413.49 264.45 45.94 17.60 0.00 2.00 0.00 2446.47
As at 8 March 2025
Total Number of Employees
F/T P/T F/T P/T
1198 365 239 1549
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00 2404.42
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3351
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3387
MALE FEMALE TOTAL
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources' Workforce Plan
2025 to 2027 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Community and Enterprise Resources’ Workforce Plan 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Community and Enterprise Resources’ Workforce Plan 2025 to 2027,
attached at Appendix 1, is approved. 
3. Background
3.1. South Lanarkshire Council is committed to delivering high-quality services that
improve the lives of residents across the region. The Council Plan 2022 to 2027
outlines strategic priorities under the themes of People, Planet, and Progress. To
support these priorities, the Council has developed a Workforce Strategy that
ensures the right people are in the right roles at the right time.
3.2. The Council Workforce Strategy and Planning process provides the framework for
workforce planning in the Council. The Strategy and Plans are aligned to current and
future Council service needs and details the approach by the Council to ensure that
the workforce required is in place to meet those needs. The Council Workforce
Strategy and Plan was approved at Executive Committee, 28 May 2025.
3.3. Resource workforce plans detail the key areas of focus for Resources for 2025 to
2027, the current resource workforce profiles, the key workforce challenges and
actions identified to address challenges. 
3.4. Engagement and consultation to produce workforce plans has been primarily
through HR Business Managers and Resource Management Teams. Resources
have undertaken a horizon scanning exercise as part of the Resource planning
process to identify key areas of focus which, along with workforce data, has been
used to complete workforce planning toolkit templates. In addition, there has been a
review of previous actions for the period 2022 to 2025 to identify any ongoing activity
to be reflected in 2025 to 2027 plans. This structured approach has enabled the
identification of strategic workforce priorities and the development of targeted actions
to address them.  
6
39

Page 40

4.  Community and Enterprise Resources’ Workforce Plan 2025 to 2027
4.1. The new Community and Enterprise Resources’ Workforce Plan is attached as
Appendix 1. The workforce planning process identified five key and inter-related
priority areas, each with associated challenges and actions, as follows: 
Recruitment, Attraction, and Retention
4.1.1. The challenges identified were the recruitment and retention of professional and
specialist roles and the staff demographic. To address this, the Resource will
continue to use a ‘grow your own approach’, This approach will include succession
planning to develop future leaders, expansion of graduate recruitment and career
pathways, including the relaunch of the apprentice programme within the roads
service, as well as promotion of the Council as an employer of choice. 
Transformation
4.1.2. Across the Resource there is ongoing financial pressures and the requirement to
deliver statutory services.  There are also requirements to ensure that we provide
employees with the training and support on legislative and policy changes within key
sector areas such as Waste and Bereavement along with support for key
transformation projects and programmes and innovation such as the Town Centre
regeneration programme. 
Skills Gap
4.1.3. The workforce planning process has identified skills gaps across all Council
resources in relation to digital upskilling and specialist knowledge as referenced in
transformation. The Council’s Learning and Development Strategy will address this
through development to support change management and also skills development
across IT to support digital. 
Delivery of Key Activities
4.1.4 To deliver the key areas of activity for the Resource, there are challenges relating to
increased service demand with ongoing financial pressures, sustainable service
delivery and climate change responsibilities, and the progression of digital innovation
in service delivery. The Resource will review staffing arrangements to deliver key
activities and service demand pressures. 
Employee Wellbeing
4.1.5. There are challenges across services in terms of absence management, staff
resilience and it should continue to enhance employee engagement. Personnel
Services are recruiting additional resources to support managers in maximising
attendance. The service will also continue to review and improve supports to
enhance employee wellbeing and engage with Trade Unions in line with Partnership
Working arrangements.   
4.2. The Workforce Plan will be monitored through the Community and Enterprise
Resources’ Senior Management Team, with an update provided to the Committee on
an annual basis as will be case for all other Resources and their respective
Committees. 
5. Employee Implications
5.1. Having a Workforce Strategy and proactive workforce planning process in place
ensures an effective workforce is in place to deliver Council services. 
40

Page 41

6. Financial Implications
6.1. There are no additional financial implications directly associated with undertaking the
workforce planning process. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no implications for climate change, sustainability or for the environment on
this report. 
8. Other Implications
8.1. Workforce planning is incorporated into Resource risk registers to acknowledge that
having the right workforce with the right skills at the right time is reliant on the key
workforce actions progressing. 
8.2. Workforce Planning actions will be assessed as part of the Resource risk management
arrangement and relevant issues added to the Community and Enterprise Risk
Register. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy or strategy, and no impact assessments
are required. An integrated impact assessment was undertaken for the Workforce
Strategy. 
9.2. Trade Unions have been involved in the workforce planning process and updated
through updates to Joint Trade Union Council Executive. Resource workforce planning
activity is reported through Joint Consultative Committees. 
David Booth
Executive Director (Community and Enterprise Resources) 
22 August 2025 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open, and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve 
Outcomes
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships  
41

Page 42

Previous References
 Council Workforce Strategy and Plan 2025 to 2027, Executive Committee 28 May
2025 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Elaine Maxwell, HR Business Manager
Ext:  4647  (Tel:  01698 454668)
E-mail:  elaine.maxwell@southlanarkshire.gov.uk  
42

Page 43

Community and Enterprise Workforce Plan 2025 – 27  
6
43

Page 44

Community and Enterprise Workforce Plan 2025 – 27 
Community and Enterprise
Workforce Plan 2025 – 27 
1. Introduction
2. Resource Overview
3. Key Resource Activity
4. Resource Workforce Profile
5. Resource Workforce Plan 
6. Risk Implications
7. Monitoring the Plan
Appendix 1 – Review of 2022-25 Actions
Appendix 2 – Community and Enterprise Resources Workforce Profile 
Appendix 3 – 2025 – 27 Community and Enterprise Resources Workforce Planning
Actions 
44

Page 45

Community and Enterprise Workforce Plan 2025 – 27 
1. Introduction
South Lanarkshire Council delivers a wide range of services across the community that
improve the lives of everyone living in South Lanarkshire. At the heart of the Council vision
are values based on fairness, empathy, and a commitment to make a difference for the
people of South Lanarkshire. The Council strives to be high achieving and high performing
and to achieve this requires an available, capable, and resilient workforce.
The Council Plan 2022 – 2027 sets out the Council priorities and how these will be delivered.
The foundations of the Council plan are based on People, Planet and Progress. 
To deliver the Council priorities the Council has a Workforce Strategy which sets out the
workforce planning framework used to identify the key strategic drivers, service demands
and the actions to ensure that the Council has the right people in the right place at the right
time to deliver our vision.
This framework has been used to produce Resource and Council workforce plans, which
outline the workforce challenges and actions for South Lanarkshire Council. 
The previous workforce plans covered 2022 – 2025 and this Council Workforce Plan covers
the period 2025 – 27, to align with the lifecycle of the current Council Plan. 
2. Resource overview
Community and Enterprise Resources comprises the following four service areas –
Facilities, Waste and Grounds services; Roads, Transportation and Fleet services;
Planning and Regulatory services; and Enterprise and Sustainable Development
services. The resource provides a wide range of services for local communities, including: 
• delivering key services within schools and council premises, including cleaning, catering,
receptionist, janitorial, concierge, and crossing patrol services
• keeping our streets clean and maintaining and developing public parks, open spaces, tree
stock, fixed play areas, sports fields, golf courses, allotments, and food growing
opportunities 
• collecting and disposing of waste and encouraging recycling
• managing and maintaining the council’s cemeteries and crematorium, providing
bereavement services, and ensuring the provision of burial ground 
• maintaining our roads and transportation network to support safe and effective transport,
and promoting active travel 
• procuring and managing the council’s vehicle fleet, including refuse collection, roads
maintenance, street sweeping and passenger transport 
• providing planning and building standard services which guide and control physical
development and land use in the area, ensure the health and safety of persons in or about
buildings, ensure the conservation of energy and the achievement of sustainable
development 
• protecting public health through the delivery of environmental health services 
45

Page 46

Community and Enterprise Workforce Plan 2025 – 27 
• providing trading standards to protect consumers and communities 
• promoting economic development and delivering support for local businesses 
• delivering effective employability services to support individuals and business 
• supporting town centres and physical regeneration, and 
• leading the council in developing and promoting sustainability, supporting the transition to a
net zero carbon economy, and addressing climate change. 
The resource also has a significant role to play in managing the relationship between the
council and South Lanarkshire Leisure and Culture (SLLC). SLLC deliver leisure and cultural
services on behalf of the council and promote the health and wellbeing of South Lanarkshire
residents through libraries, cultural venues, museum, arts centres, indoor and outdoor sports
and leisure centres, community halls and country parks. The Resource Plan is an important
element of the council’s performance management arrangements and is complemented by
individual service plans and other key business plans and strategies. Service teams will
continue to be involved in a series of reviews which will inform how our services are shaped
and delivered in the future.
3. Key Resource Activity
Overview 
The resource has identified the main challenges, risks and new developments which will have
significant impact on the delivery of services in the coming year. These are outlined briefly
below. 
Local Development Plan (LDP) 
The council has a statutory duty to prepare a Local Development Plan for all parts of its area.
Preparation of the council’s third LDP (LDP3) has recently started. It will address the spatial
implications of national planning policy, National Planning Framework 4 (NPF4), for different
places at a council-wide level. The focus of the plan will be to address challenges, including
the climate and nature emergencies, the embedding of sustainable development principles in
decision making, tackling poverty and disadvantage and health inequalities and embedding
the principles of Local Living through the identification and maintenance of 20-minute
neighbourhoods. The plan will be place-based with the Place Principle providing the policy
context to ensure a participative approach to the future planning of places, services and
infrastructure through partnership working with council services, transport providers, local
communities, and health and education providers. The plan will be people-centred so that it
meets the needs and aspirations of people and communities. Extensive engagement will
continue to be carried out with stakeholders, partners and local communities so that the plan
is prepared collaboratively taking into account a diverse range of views. The LDP will support
decisions to invest in places by identifying priorities and focussing on the delivery of outcomes
by drawing together all the council’s strategies, plans and the objectives of the Council Plan,
Connect, as well of those of its partners and other stakeholders. The LDP must take account
of the council’s Community Plan. The plan will take an infrastructure first approach so that an
understanding of existing capacity and the requirement for new or improved infrastructure
(including schools and health and social care provision) is an integral part of the plan process
and this will inform the site selection process. New development will be directed to the right
locations and will be expected to meet the principles of placemaking. LDP3 will include a
Delivery Programme which will set out how the council will implement the plan and provide
46

Page 47

Community and Enterprise Workforce Plan 2025 – 27 
certainty for local communities and partners. The plan will be a key driver for delivering on the
main areas of focus, for example by ensuring there is sufficient employment land to achieve
inclusive economic growth goals and creating a land use framework for the regeneration of
our town centres. At a council wide level, the plan will continue to identify opportunities to
deliver the council’s affordable housing programme and reflect the outcomes of the review of
the Strategic Commissioning Plan. Access to good quality greenspace and safe and
accessible active travel routes are also a key priority for the resource, encouraging physical
exercise and improving the wellbeing of our communities. The continuing preparation of the
council’s Open Space Strategy will contribute to achieving these aims. 5 The focus for 2025-
26 is the completion of the Evidence Report which will inform the spatial strategy for LDP3.
Extensive collaboration has taken place with other services and partners in terms of data
gathering and assessment and the carrying out of engagement. The implementation of
changes to the Building Regulations in 2024 in relation to the energy performance of buildings
will also be a focus for 2025-26. 
Cost of Living Crisis 
The UK continues to experience the worst cost-of-living crisis in 40 years. While all sectors of
society are seeing prices rise, the impacts are greatest for those on the lowest incomes. The
council recognises the immense pressures being faced by households across South
Lanarkshire and acknowledges the potential for additional demands on council services as a
result. The council has in place a range of support which can help households manage scarce
resources, and services will continue to explore all avenues to support the most vulnerable in
the year ahead. While doing all we can to support our communities in these difficult times, the
council recognises that this also presents significant challenges for council services as
budgets are increasingly squeezed by rising costs. This will undoubtedly be the case within
Community and Enterprise Resources. However, working collaboratively across our
communities with all key stakeholders will allow opportunities to be maximised through
sustainable economic growth. 
Economic Development and Renewal 
The UK, Scottish, Glasgow City Region and South Lanarkshire economies are all facing real
challenges following the global pandemic, our country’s new international trading position, the
war in Ukraine and the climate emergency; all of which impact our lives now and in the
foreseeable future. Economic recovery in South Lanarkshire is incorporating the principles of
community wealth building and be framed around three key themes of sustainable
development: People, Place and Business (or social, physical, and economic regeneration).
These themes align council and pan-Lanarkshire activity with local, national and regional
strategies, delivering the collaborative approach required to achieve sustainable and inclusive
economic growth. The Economic Strategy (2022-27) sets out the key priorities and actions for
the council and aims “to make South Lanarkshire a flourishing, green, dynamic and equitable
place for all”. Working in partnership with North Lanarkshire Council, the delivery of the
Business Gateway Service is now being delivered ‘in-house’ which will deliver a more
customer focussed service, rather than a target driven delivery model, leading to better
outcomes for businesses and the economy. Since this change, all referrals for business advice
are referred directly to the Business Gateway and they are the public facing organisation for
business support within South Lanarkshire. 
Town Centre Regeneration 
47

Page 48

Community and Enterprise Workforce Plan 2025 – 27 
Town centres retain a key role at the heart of our communities as a focal point for retail,
business, culture, leisure and social interaction. Our town centres remain a council priority,
and we are working across all our towns to manage change to allow our towns centres to
serve the evolving needs of communities in the future. The way in which we support each town
varies depending on the specific challenges, ranging from large transformational masterplans
in East Kilbride and Hamilton, which have been formally adopted by the council, to smaller
local interventions linking to local priorities and Community Wealth Building priorities. 
UK Government Shared Prosperity Funding (UKSPF) 
Following the UK withdrawal from the European Union, the UK Government outlined proposals
to replace EU funding with national funds to address structural and economic imbalances and
to aid the public and private sector in delivering transformational change in communities. The
delivery of the 3-year £12m UK Shared Prosperity Funding (UKSPF) programme commenced
in 2022. UK Government has confirmed additional funding for a fourth year, 2025-26, and for
the council this amounts to £4m compared to £7.1m in 2024/25. Economic Development
officers have worked with council services and external partners on delivery of the UKSPF to
maximise economic and community outcomes. Delivery of over 23 projects, over the term of
the programme, across council resources ranging from employability support to business
grants and grants to communities, is progressing and is reported quarterly to the UK
Government through Glasgow City Region. 
Levelling Up Fund 
Two projects have been awarded funding by the UK Government Levelling Up Fund. These
are the Clydesdale Way (awarded £6.8 million of grant as part of the cross-council border
Three Rivers Active Tourism project) and Shawfield Remediation (awarded £14.6m) for Clyde
Gateway URC to progress decontamination and redevelopment of the Shawfield area. These
projects will be progressed in 2025-26, with completion in line with the requirements set by
the UK Government. 
Glasgow City Region City Deal 
As part of the City Deal, the resource is leading the delivery of three major transportation
projects being undertaken to boost South Lanarkshire’s access to the rest of Scotland. The
Cathkin Relief Road in Rutherglen / Cambuslang and the Greenhills Road project in East
Kilbride is complete. Proposals in relation to Stewartfield Way and East Kilbride Town Centre
are progressing well and being developed through the preparation of the Outline Business
Cases. Other school and transportation projects are being progressed by the resource in
support of the various Community Growth Areas across South Lanarkshire. 
Deliver effective Employability Services to support Individuals and Business South
Lanarkshire 
Works will continue to deliver a range of employability programmes to meet the needs of key
priority groups and employers and support South Lanarkshire residents into sustainable
employment. A key focus of the 2025-26 Annual Investment Plan, which is developed and
agreed with the South Lanarkshire Employability Partnership (SLEP), is to increase the
availability of specialist employability support to participants with learning disabilities and other
long-term health conditions. Specialist employability support involves long-term and intensive
keyworker-based support, with significant in-work aftercare to support sustainable
employment outcomes. The Annual Investment Plan will continue to include support for
parents to progress to employment as a key priority. The Supporting Families approach, which
48

Page 49

Community and Enterprise Workforce Plan 2025 – 27 
involves working in partnership with primary schools and early years centres to identify and
support socially excluded parents, will be rolled out across South Lanarkshire to support
progressions to employment. 
Sustainable Development and Climate Change (SDCC) 
The council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency and in
Scotland’s transition to a net-zero and climate resilient society and economy. It is expected
that, as a public body, the council leads by example and uses its role to influence area-wide
climate change action and sustainability. The Sustainable Development and Climate Change
Strategy 2022 – 2027 and action plan sets out how the council aims to develop sustainably
and tackle climate change. The council supports the delivery of Climate Ready Clyde’s
Adaptation Strategy and action plan which seeks to transform Glasgow City region to adapt to
the climate challenge and ensure everyone benefits from doing so. The council is also
responsible for submitting annual Public Bodies Climate Change Duties reporting, which
details progress made by the council in delivering against its duties, as set out in the Climate
Change (Scotland) Act 2009. The inability to take the necessary action - due to funding
constraints - to combat climate change and work toward achieving net zero carbon emissions
by 2045 (thereby contributing to negative and irreversible environmental, social and economic
impacts on the council and its residents) is a top risk for the council. Sustainable development
and climate change work carried out by the council seeks to mitigate this risk. 
Circular Economy 
The Circular Economy (Scotland) Act 2024 sets out requirements for the following: a Circular
Economy Strategy; Circular Economy targets; legislation aimed at reducing waste; increases
in penalties for littering from vehicles; legislation to enhance duty of care responsibilities for
households and businesses; and legislation to improve waste monitoring. These measures
will underpin and complement Scotland’s Circular Economy and Waste Route Map. The route
map will set out the strategic direction for waste management in Scotland until 2030, based
on responsible production, responsible consumption, and maximising value from waste and
energy. 
Local Transport Strategy (LTS) 
Consultation on the draft LTS is currently being scheduled for Spring 2025, with the finalised
draft document being presented to Committee for approval after the summer recess. Policies
and actions are drafted taking cognisance of the Regional and National Transport Strategies.
The new Local Transport Strategy will be an ambitious and forward-thinking strategy that sets
out a strategic vision and objectives, alongside proposals for a ten-year Action Plan. It will be
used to guide the transport actions and priorities of the council and will also be used to
influence the actions of a range of partner organisations who deliver aspects of transport within
South Lanarkshire. Main themes of the strategy will include reference to maintenance and
asset management, road safety, the economy, sustainable and public transport, the
environment, inclusive mobility, spatial planning as well as the use of technology. Plans for
implementation of actions and monitoring will also be included. Strathclyde Partnership for
Transport (SPT) have recently published their Regional Transport Strategy. Several themes
are highlighted relating to public transport, managing travel needs, active travel, integration of
travel, road safety, sustainable travel, climate resilience, environment and connecting places. 
This also links with the National Transport Strategy which sets outs various priorities and
themes. These priorities look to reduce inequalities, take climate action, help deliver inclusive
49

Page 50

Community and Enterprise Workforce Plan 2025 – 27 
economic growth and improve our health and wellbeing, as well as those relating to public
transport, managing travel needs, active travel, integration of travel, road safety, sustainable
travel, climate resilience, environment and connecting places. 
Health and Wellbeing 
This is a cross-cutting theme within Community and Enterprise Resources and covers a wide
range of activities, from promoting healthy eating (via the provision of school meals), to the
positive contribution that our partner, SLLC, makes in ensuring inclusive access to sport,
leisure and culture across our communities. Community and Enterprise Resources will assist
SLLC in the provision of these services by continuing to oversee capital investment in the
council’s leisure and culture facilities: the new build of Larkhall Leisure Centre over the next
three years will be a major project for the Resource, as will be the implementation of the
council’s £13m Leisure and Culture Transformation Fund which will help modernise the leisure
and culture estate, optimise use of the leisure and culture assets and assist in the transition
towards net zero. The environmental health service promotes health protection practices and
regulates public health across South Lanarkshire. 
Free School Meals Roll Out 
The Scottish Government is committed to extending free school meal provision to pupils in P6
and P7, with stage 1 extending free school meals to those pupils in P6 and P7 in receipt of
the Scottish Children payment. There will be a phased roll out of free school meals to children
and young people in primary 6 and 7 who are in receipt of the Scottish Child Payment
beginning in February 2025 to be completed by August 2026. It is unlikely the roll out to
remaining P6 and P7 pupils will be completed in this parliamentary term due to financial
uncertainty. 
Legislative and Policy Changes 
New and revised legislation will also impact on the work of the resource during 2025-26,
including: 
Climate Change Act (2019) – Whilst not new legislation, the Climate Change Act (2019)
continues to impact on the council’s activities and commits Scotland to net-zero greenhouse
gas emissions by 2045. The Climate Change (Scotland) Act states that a public body must: −
contribute to the delivery of Scotland’s national emissions reduction targets − help deliver
Scotland’s statutory climate change adaptation programme, and − act in a way that it considers
is most sustainable On 5 September 2024, the Scottish Government introduced the Climate
Change (Emissions Reduction Targets) (Scotland) Bill which replaced the interim and annual
targets previously set out in the Climate Change (Scotland) Act 2009. The Bill replaces those
targets with a system of targets based on carbon budgets. Scottish Ministers will need to set
carbon budgets so that every year between 2026 and the net-zero emissions target year
(2045) is covered by a budget. Each carbon budget will cover a period of five years and will
set out the amount of greenhouse gas emissions allowed during that period. The Bill also
changes the deadline for the first Climate Change Plan. This Plan must be laid before the
Parliament as soon as possible after the first carbon budgets have been set. 
Transport (Scotland) Act 2019 - This act is designed to help make Scotland’s transport
network cleaner, smarter and more accessible. The Act deals with a number of issues
including, Prohibition of Pavement Parking, Bus Services, Roadworks, Workplace Parking and
Low Emission Zones. 
50

Page 51

Community and Enterprise Workforce Plan 2025 – 27 
Pavement Parking - A key provision of the Act is to prohibit the parking of vehicles on
pavements, prohibit double parking and prohibit parking adjacent to dropped footways. The
council commenced enforcement of pavement parking in January 2025 which saw a balanced,
proportionate and pragmatic “soft” behavioural change approach with a complementary
communications campaign. 
Bus Services - The Act provides local transport authorities with powers to make bus travel
more attractive, allowing local transport authorities to run their own bus services; franchise
bus services in their areas; or enter into Bus Services Improvement Partnerships (BSIPs) with
bus operators within their areas. The Act also introduces new regulations covering the way in
which bus operators must provide information to local authorities when they plan to reduce or
withdraw the services they provide. Strathclyde Partnership for Transport (SPT) are currently
drafting their Regional Bus Strategy and considering next steps in terms of franchising. On
completion, this will allow consideration of what opportunities there are for these types of
measures as well as the Act’s other section which relates to smart ticketing options. These
provisions will have significant employee and financial resourcing issues. 
Road Works - The Act seeks to continually encourage a raise in standards to improve the
quality of road works. The key provisions include: additional powers given to the Scottish Road
Works Commissioner to strengthen enforcement on non-compliance of legislation in relation
to road works with the use of fines and monitoring; a requirement for all undertakers to have
a Reinstatement Quality Plan (RQP) in place; and a revised timescale for notifying within 2
hours of the commencement and completion of works. A revised Specification for the
Reinstatement of Opening in Roads (SROR) is also now in force, increasing the guarantee
period for the majority of asphalt reinstatements to 6 years. It should also be noted that the
Commissioner has increased on site monitoring through the introduction of several
compliance officers who will be undertaking drive by observations, with a particular focus on
roads authorities in the first instance. • 20mph speed limits Scotland’s Road Safety Framework
to 2030 is committed to creating a safer, healthier and greener Scotland. It is the council’s
aspiration to introduce mandatory 20mph speed limits within residential areas in line with the
new Scottish Government policy. A review of an assessment study of approximately 6,000
streets is ongoing and the outcome will shape the delivery of 20mph speed limits across South
Lanarkshire. Significant resources will be required for the promotion of associated traffic
regulation orders and signage. 
Other impacts - The Transport (Scotland) Act 2019 also enables local authorities to manage
vehicle emissions via the establishment of Low Emission Zones (LEZ) and introduce
Workplace Parking Charges to influence travel behaviour. However, there are no plans at this
time to introduce these in South Lanarkshire. 
51

Page 52

Community and Enterprise Workforce Plan 2025 – 27 
4. Community and Enterprise Workforce Profile
The full workforce profile is attached in Appendix 3. The data reviewed covers the period
April 2023 – March 2024. Resources used this data to complete their workforce plans for
2025 – 27. 
The key highlights from the workforce profile are detailed below.
Employee Numbers
For April 2023 – March 2024, Community and Enterprise Resources employed an average
of 3452 employees, equating to 2627 Full Time Equivalent (FTE). 
The workforce is split across four services; the split of each Service is shown below in Table
1 by headcount (number of employees) and total FTE.
Table 1 Employee numbers
Service Headcount FTE
Community and Enterprise 3452 2627
Facilities, Waste and Grounds 2702 1942
Planning and Regulatory 136 131
Enterprise and Sustainable Development 111 101
Roads, Transportation and Fleet 503 454 
Employment Status 
As of 31 March 2024, CER employed 3317 employees. There are 86 employees who are in a
temporary position, 3229 employees in a permanent position and 2 casual employees. This is
detailed in table 2.
The majority of the Service’s workforce is employed on a part-time basis, with the highest
proportion of part time employees within Facilities, Waste and Grounds. 
Table 2 Employment Status
Service Permanent
Employees
Temporary
Employees
Casual
Employees
Total
Employees
Community and Enterprise 3229 86 2 3317
Facilities, Waste and Grounds 2507 73 2 2582
Planning and Regulatory 135 1 - 136
Enterprise and Sustainable
Development 107 2 - 109
Roads, Transportation and Fleet 480 10 - 490 
Gender Split
The gender split across Services* is detailed in Table 3. The Resource workforce consists of
45.9% male and 54.1% female. 
52

Page 53

Community and Enterprise Workforce Plan 2025 – 27 
Table 3 Gender Split
Service Female Male Total Employees
Community and Enterprise 1794 1521 3315
Facilities, Waste and Grounds 1577 1003 2580
Planning and Regulatory 65 71 136
Enterprise and Sustainable Development 83 26 109
Roads, Transportation and Fleet 69 421 490 
*As at 31 March 2024 and excluding casual employees
Age Range
The age range across Services* is detailed in Table 4. Seventy-eight percent of the workforce
are age 40 or over. Facilities, Waste and Grounds (FWG) has the highest employee numbers
aged 65 and above, as well as the highest number of employees aged 50 and above. Roads,
Transportation and Fleet has the highest number of employees aged 16-19 years alongside
FWG. 
Table 4 Age Range
Service 16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
Community and
Enterprise 15 187 532 678 1075 562 266 3315
Facilities, Waste and
Grounds 7 123 423 519 825 457 226 2580
Planning and
Regulatory 1 8 21 41 47 15 3 136
Enterprise and
Sustainable
Development
- 7 16 32 42 11 1 109
Roads,
Transportation and
Fleet
7 49 72 86 161 79 36 490 
* As at 31 March 2024, excluding casual employees.
Absence
The absence rate for the Resource for 2023/24 was 6.23%. The details are in table 5. 
Table 5 – Absence rates
Service Absence 23/24
Community and Enterprise 6.23%
Facilities, Waste and Grounds 6.59%
Planning and Regulatory 3.14%
Enterprise and Sustainable Development 3.03%
Roads, Transportation and Fleet 5.78%
53

Page 54

Community and Enterprise Workforce Plan 2025 – 27 
Leavers and Turnover
From 1st April 2023 to 31st March 2024, 526 employees left the Resource, equating to 329.99
FTE. The turnover rate for the Resource for 2023/24 was 15.24%, this turnover rate is
calculated using all leavers. 
Recruitment
During 2023/24 274 posts were advertised attracting 2636 applications. Candidates were
appointed to 298 posts. 
Full details of the workforce profile are attached in Appendix 2. 
5. Resource Workforce Plan
Resource Workforce plans were produced covering the period 2022 – 25. These plans have
been reviewed to provide an update on actions to date and to identify any ongoing activity to
be reflected in the 2025 – 27 plans. A summary of the review is included in Appendix 1.
During 2024, Resources undertook a horizon scanning exercise as part of the Resource
planning process to identify key areas of focus moving forward. Following this, working with
HR Business Managers, Heads of Service completed the workforce planning toolkits to
consider the workforce requirements to deliver resource plan outcomes, local and national
drivers, as well as known and anticipated changes that will impact on the workforce. The
workforce profile information was also taken into account as part of this exercise. 
Common theme emerged across all Resource and the priority workforce planning areas for
actions are as follows:
• Recruitment / Attraction and / retention
• Transformation
• Skills gap
• Delivery of key activities
• Employee well being 
All of this activity identified the key workforce challenges and the actions for Community and
Enterprise Resources, a summary is provided in the table below. 
54

Page 55

Community and Enterprise Workforce Plan 2025 – 27 
Summary of challenges and actions
Priority Identified Need  Key Challenges Action
Recruitment / Attraction /
Retention
Age profile of workforce 
Loss of knowledge, skills,
and experience
Professional and specialist
posts are hard to recruit and
retain. 
Continue to expand use of
‘grow your own’ approach.
Implement robust
succession planning. 
Transformation Budget gap and maintaining
service delivery
Cost of living crisis
Impact of providing cross
council support for
transformation and ability to
contribute to financial
savings
Continuing service
improvement from Oracle
Fusion 
Manage efficiencies
achieved as oracle fusion is
embedded
Identify skills required to
support digital
transformation across the
Council 
Skills gap Skills to support
organisational
transformation
Digital upskilling and
specialist knowledge 
Leadership development 
Develop skills for existing
employees to enable
progression and increase
retention.
Skills development to
support strategic IT. 
Delivery of Key Resource
Activities
Strategic digital
development and how this is
supported
Community involvement
Support the Council achieve
net zero and deliver
sustainable development
and climate change
Maintain staffing structure to
enable delivery of Resource
objectives
Increased demand for
services
Support for implementation
of new technologies 
Support digital
transformation by ensuring
employees have skills to
deliver the strategy 
Ensure structures in place to
support increased demand
for services
Review staffing to respond
to new developments eg
development in 
Employee Well being Maintaining employee
wellbeing and resilience
Reducing absence
Improved employee
engagement 
Provision of employee
supports
Additional resources to
support absence
management 
55

Page 56

Community and Enterprise Workforce Plan 2025 – 27 
The Community and Enterprise Resources Workforce Action Plan is attached in Appendix 3. 
This provides the detail on the actions to deliver the plan, how they will be achieved, who is
responsible for the delivery, the expected outcomes, and the timescales to be achieved by. 
Engagement and consultation to produce workforce plans has been primarily through HR
Business Managers and Resource Management Teams,
Trade Unions have been updated on activity through JTUC Executive updates and Trade
Unions were also asked to provide details of workforce challenges from TU perspective via a
survey. 
6. Risk Implications
The actions identified to assist the Council to achieve the right people with the right skills to
deliver services. However, there are risks if these actions cannot be delivered. These are:
• Reduced workforce supply is a risk to meeting the Councils requirements 
• Ability to train and develop staff to create our own talent into specialist roles within
required timescales and maintain service delivery 
• Competing recruitment drives across services and sectors 
The risks identified with workforce planning will be included in the Resource risk registers. 
7. Monitoring the Plan
The action plan will be monitored through Resource Management Teams. As the 
arrangements on national initiatives emerge any significant changes will be reflected in 
updated action plans. Resource workforce plans will be formally reported through annual 
updates on actions to Resource Committees. The Council workforce plan will be reported to 
Executive Committee on an annual basis. 
56

Page 57

Community and Enterprise Workforce Plan 2025 – 27 
Appendix 1 
Review Workforce Plan Actions 2022 – 25
An update on the key actions from the Community and Enterprise Resources 2022 – 25
workforce plan is provided below: 
Priority / identified
need
Actions Achievements Next steps
1a Increased demand and
reduced workforce pool 
Revised
recruitment
practices, utilise
employability
routes. 
Revised
recruitment
practices are now
embedded
The introduction of
essential and
desirable criteria in
job profiles, assist
in shortlisting
Oracle fusion,
recruitment
processes have
been reviewed.
Successful open
days and
recruitment
programme across
roads and fleet.
Facilities Services
have engaged with
Employability
programmes, with
successful
outcomes and
candidates
securing
permanent posts. 
This will be
addressed
through further
review and
revisions to the
Recruitment
Strategy and
the 
Learning and
Development
Strategy 
1b  Succession
Planning
Succession
planning is
discussed as part
of appraisal
process and
potential leaders
are nominated to
join the Leadership
Development
program. 
Apprenticeship
programme for civil
engineering
students has seen
4 Engineering
Officers progress
into permanent
This will be
addressed
through further
revisions to the
Recruitment
Strategy and
the 
Learning and
Development
Strategy 
57

Page 58

Community and Enterprise Workforce Plan 2025 – 27 
roles in the Roads
Service. 
2a Service Design and
Efficiency savings 
Managing
employee impact
of savings 
Facilities Services
have successfully
redeployed a
number of
employees
throughout the
period.
The revision of
SWITCH2
arrangements
in relation to
managing
employee
impact of
savings activity
will ensure that
employee skills
are maximised. 
2b  Service Redesign The Council has a
program of
transformational
reviews to enable
services to be
delivered in a
different way to
achieve
efficiencies.
The
transformational
review
programme is
ongoing and
current reviews
are within
services areas,
as well as
reviews of
overtime
reduction and
organisational
structures. 
3a IT / Digital  Implementation of
Fusion (HR,
finance, and
procurement) 
The new system
was implemented
in August 2024 and
processes have
been improved to
reflect the
capability of the
new system. 
The workforce
planning
process has
matured to
provide a
specific focus to
consider the
workforce
supports for the
delivery of a
Digital Council 
3b  Implementation of
Resource IT
systems
Facilities Services
rolled out IT
solutions for Cooks
in Charge and
Janitorial
employees. 
A new modern
office roads
As the Council
moves towards
more digital
solutions the
workforce plans
will reflect
actions to
ensure that our
workforce is
58

Page 59

Community and Enterprise Workforce Plan 2025 – 27 
management
system came into
operation in April
2025. 
digitally aware
and included.
4 Employee support and
wellbeing
Enhance
employee support
Revised
occupational health
provision has
enhanced the
support available to
employees
Employee
supports will
continue to be
reviewed to
ensure the
supports are
accessible to all
employees. 
There is a
review of
Maximising
Attendance
Policy and
supporting
procedures to
ensure that the
Council
continues to
develop good
practice to
support and
engage the
workforce 
59

Page 60

Workforce Profile: Community and Enterprise Resources          Appendix 2
Section 1: Headcount and Full Time Equivalent
For the year 2023/24, South Lanarkshire Council (SLC) employed an average of 17,086 employees, equating to 14,046 Full Time Equivalent (FTE).
Community and Enterprise Resources employs 3452 employees at 2627 FTE, accounting for 20% of the Council’s headcount. The headcount and FTE for each Service
is shown in Table 1. 
Table 1 – CER Headcount and FTE
Headcount - 3452 FTE - 2627   
Within SLC, Community and Enterprise has the largest variance between FTE and Headcount (though the proportional size of Services remains broadly the same),
with employees averaging 0.76 FTE (Council average is 0.82). This almost exclusively due to the make up of Facilities, Waste and Grounds Service, specifically, the
Facilities Service where 86% of employees are employed on Part Time contracts (as seen in Section 2, Table 3). On average, employees within Facilities are contracted
to 0.61 FTE.
The Resource headcount and FTE fluctuate throughout the year due to the work carried out by the Grounds Service which employs high numbers of seasonal
employees. 
Facilities,
Waste and
Grounds
2702.17
78%Planning and
Regulatory
135.83
4%
Enterprise and
Sustainable
Development
110.92
3%
Roads,
Transportation
and Fleet
502.58
15%
Facilities, Waste
and Grounds
1942.11
74%
Planning and
Regulatory
130.53
5%
Enterprise and
Sustainable
Development
101.19
4%
Roads,
Transportation
and Fleet
453.70
17%
60

Page 61

Section 2: Employment Categories and Hours Worked
As at 31st March 2024, Community and Enterprise employed 3317 employees, with a combined total of 4009 assignments. 2 employees were categorised as Casual
and there were 17 Seasonal employees employed by the Grounds Service. 
Table 2: Employment Category Split 
Resource Permanent
Employees
Temporary
Employees
Casual
Employees
Total
Employees
SLC 15377 594 769 16740  
Community and Enterprise 3229 86 2 3317    
Facilities, Waste and Grounds 2507 73 2 2582    
Planning and Regulatory 135 1 - 136    
Enterprise and Sustainable   Development 107 2 - 109    
Roads, Transportation and Fleet 480 10 - 490 
*Please note that for all further data sets, Casual Employee figures have been removed. The total number of employees employed by SLC as at 31st March
2024 is therefore 15,971 and Community and Enterprise Resources, 3315. 
The majority of the Council’s workforce is employed on Full Time contracts, which for the purposes of this report, has been taken to mean employees working 35
hours or greater per week at a Full Time Equivalent greater than or equal to 0.90. Term – Time employees who meet this criteria over 39 weeks have also been included
in the Full – Time count.
As shown below, 56% of SLC’s workforce were employed Full Time, with the remaining 44% categorised as Part Time employees as of 31st March 2024. The full time
split of Community and Enterprise Resources and its Services is shown alongside this:
Permanent
97%
Temporary
3%
Casual
0%
61

Page 62

Table 3: Part Time / Full Time Split Full Time Split as Percentage Full Time Split of Service
Resource Total
FT
Total
PT
No.
Employees
South Lanarkshire Council 9267 6704 15971
Community and Enterprise 1464 1851 3315
Facilities, Waste and
Grounds
938 1642 2580
Planning and Regulatory 118 18 136
Enterprise and Sustainable  
Development
70 39 109
Roads, Transportation and
Fleet
338 152 490 
As noted in Section 1, 86% of Facilities is comprised of part – time employees, hence the low full time split of Facilities, Waste and Grounds. Five roles comprise the
majority of these part – time positions and are shown below as a percentage of total part – time employees, alongside the total number of employees in each position.
Table 4: Facilities – Top 5 Part – Time Positions 
Service PT Employees Total FTE
FACILITIES 1547 602    
Cleaner 717 267    
Catering Assistant 506 185    
Facilities Asst (SXP) 90 26    
Primary Cook in Charge 67 44    
Janitor / Cleaner 39 22 
FT
44%
PT
56%
Facilities,
Waste and
Grounds
36%
Planning and
Regulatory
87%
Enterprise
and
Sustainable  
Development
64%
Roads,
Transportation and
Fleet
69%
Cleaner
46%
Catering Assistant
33% Facilities Asst
(SXP)
6%
Primary Cook
in Charge
4%
Janitor/Cleaner
3%
62

Page 63

Due to this unique makeup, Facilities has a higher proportion of employees with more than one assignment relative to the rest of the Council, with employees holding
1.4 assignments on average and 555 employees having at least 2 assignments. Of those who work more than one assignment, the highest number worked was 5 (2
employees, all positions as Cleaner) and the average was 2.24. 
Section 3: Leavers and Turnover
Leavers
From 1st April 2023 to 31st March 2024, 1709 employees left the council, equating to 1239.55 FTE. 526 Leavers (329.99 FTE) held positions within Community and
Enterprise Resources. Table 4 shows the total leavers by Service and displays the headcount as a percentage of total leavers from each Service.
Table 5: Leavers by Resource Service Contribution to Resource Leavers
Resource No. of Leavers Total FTE
South Lanarkshire Council 1709 1239.55
Community and Enterprise 526 329.99
Facilities, Waste and Grounds 443 259.58
Planning and Regulatory 17 15.55
Enterprise and Sustainable   Development 9 7.27
Roads, Transportation and Fleet 57 47.59 
When looking at the distribution of leavers by headcount (as above), Facilities, Waste and Grounds appears to have a higher proportion of leavers than expected
relative to its size. The additional turnover is mainly due to the Grounds Service, which employs high numbers of Seasonal workers. In total, 119 leavers were seasonal
workers at 118 FTE.
Excluding these workers from the number of leavers brings the Resource total to 407 and the total for Facilities, Waste and Grounds to 324, resulting in the Service’s
share of leavers dropping to 80%.
Table 6 details all leavers across Community and Enterprise Resources (including Seasonal Workers) and the reason for leaving, while Table 7 shows a breakdown of
the Top 5 leave reasons by Service.
Facilities,
Waste and
Grounds
84%Planning and
Regulatory
3%
Enterprise
and
Sustainable
Development
2%
Roads,
Transportation
and Fleet
11%
63

Page 64

Table 6: Reasons for Leaving Community and Enterprise Resources 
As shown above, the five most common reason for leaving Community and Enterprise were Personal Reasons (24%), followed by Termination of Temporary / Fixed
Contracts (22%), Retirement (18%), Career Development (13%) and Dismissal Due to Ill health (6%). In total, these five reasons account for over 80% of all leavers in
the year 2023/24.
Of those who left due to the termination of temporary contracts, 94 of these posts were seasonal workers within Grounds.
There is a large variance between the number of leavers due to Personal Reasons (125) and their equivalent FTE (56.80). This puts the average FTE of employees
leaving due to personal reasons at 0.45 FTE, far lower than the average 0.76 of the Resource. 92 of these leavers sit within the Facilities Service (34% of Facilities
leavers) and account for 28.07 FTE, an average of 0.30 FTE per leaver. Again this is far lower than the average FTE within Facilities of 0.61 FTE.
0
20
40
60
80
100
120
140
Count of Assignment Sum of FTE
64

Page 65

Only 4 employees left the Resource due to Dissatisfaction with Terms and Conditions of Job, therefore the data above may indicate that this reason for leaving is being
under-represented.
The top five reasons for leaving by Headcount are shown by Table 7 on the next page for each Service, as a percentage of that Service’s total leavers: 
65

Page 66

Table 7                                         Community and Enterprise Facilities, Waste and Grounds     
Planning and Regulatory Enterprise and Sustainable Development Roads, Transportation and Fleet   
19 Personal
Reasons
24%
09 Termination
Of
Temporary/Fixed
Term/Contract
Staff
22%
01 Retirement
18%
12 Career
Development
13%
10 Dismissal
Due To Ill Health
6% 09 Termination
Of
Temporary/Fixed
Term/Contract
Staff
26%
19 Personal
Reasons
25%
01 Retirement
16%
12 Career
Development
9%
10 Dismissal
Due To Ill Health
6%
12 Career
Development
53%
01
Retirement
29%
19 Personal
Reasons
12%
Deceased
6% 01
Retirement
33%
19 Personal
Reasons
33%
12 Career
Development
22%
13 Dissatisfaction
With Terms &
Conditions Of Job
11%
12 Career
Development
26%
01
Retirement
25%
19 Personal
Reasons
19%
30
Resignation
-No Notice
Given
7%
02 Retirement
Due To Ill
Health
7%
66

Page 67

Turnover
Turnover for the year 2023/24 was calculated as the total number of employees who left the Council from within Community and Enterprise Resources between 1st
April 2023 and 31st March 2024 (443), divided by the average number of employees in post during the year (3452).
The Turnover Rate for Community and Enterprise Resources for 2023/24 was 15.24% and is broken down by Service below. This is higher than the Council rate of
10.46% and is the highest turnover of any Resource.
Table 8: Resource Turnover 
As we would expect from the high number of Seasonal employees employed by the Grounds Service, Facilities, Waste and Grounds has the highest turnover rate of
16.40% (with the Grounds Service reaching 24.09%). If we exclude Seasonal Workers from the headcount and leaver numbers, the adjusted Turnover Rate for the
Resource is estimated to be nearer 12.28%, with Facilities, Waste and Grounds at 12.63%. This would still be the highest level within the Council, ahead of Social
Work (10.99%) with Facilities contributing at 15.09%, driven by employees leaving due to personal reasons as noted on Page 5. 
Roads, Transportation and Fleet
11.34%
Enterprise and Sustainable Development
8.11%
Planning and Regulatory
12.52%
Facilities, Waste
and Grounds
16.40%
Community and Enterprise
15.24%
0.00% 2.00% 4.00% 6.00% 8.00% 10.00% 12.00% 14.00% 16.00% 18.00%
67

Page 68

Section 4: Age Profile
Table 9: Community and Enterprise Resources Age Profile 
Resource 16-19
Years
20-29
Years
30-39
Years
40-49
Years
50-59
Years
60-64
Years
65+
Years
No.
Employees
South Lanarkshire Council 61 1862 3536 3749 4475 1670 618 15971
Community and Enterprise 15 187 532 678 1075 562 266 3315
Facilities, Waste and
Grounds 7 123 423 519 825 457 226 2580
Planning and Regulatory 1 8 21 41 47 15 3 136
Enterprise and Sustainable  
Development - 7 16 32 42 11 1 109
Roads, Transportation and
Fleet 7 49 72 86 161 79 36 490 
As shown, South Lanarkshire Council has a predominantly older workforce, with 66% of employees being aged 40 or over and the largest age demographic being 50-
59, with 28% of the Council’s total employees.
Community and Enterprise follows the Council trend with 32% of employees aged between 50 – 59 years and has the oldest workforce with 78% of the employees
aged over 40 years, and 57% of employees aged over 50 years. 
Table 9 (below) shows the makeup of each Service by age demographic. Interestingly, despite Roads, Transportation and Fleet having the second oldest workforce
of the Resource, it also has the highest proportion of employees aged under 30 years as well as the highest proportion of employees aged between 16-19 years
(these are predominantly Road Operatives within the Roads and Transportation Service). 
16-19 Years
1% 20-29 Years
6%
30-39
Years
16%
40-49
Years
20%
50-59
Years
32%
60-64
Years
17%
65+ Years
8%
68

Page 69

Table 10: Proportion of Age Band by Service 
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Roads, Transportation and Fleet
Enterprise and Sustainable   Development
Planning and Regulatory
Facilities, Waste and Grounds
16-19 Years 20-29 Years 30-39 Years 40-49 Years 50-59 Years 60-64 Years 65+ Years
69

Page 70

Section 5.1: Absence Level
Absence rates for the Council are calculated each calendar month by dividing the total number of workdays lost due to absence by the total number of work days
available for that period. The absence rate for South Lanarkshire Council for the year 2023/24 was 5.38%.
The absence rate for Community and Enterprise Resources was 6.23% which is down vs. the previous year, 6.88% and is the second highest absence rate within
SLC.
Total Absence %
(2023/24)
Short Term and Long Term Absence %
(2023/24)   
Following falling rates of absence across the first Quarter of 2023/24, both short and long term absences have risen across the year, broadly at the same rate (long
term absences have increased moderately faster). Table 10 shows total absence levels for each Service:
Table 11: Service Absence Levels 
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
8.00%
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
Facilities, Waste and Grounds
6.59%
Planning and Regulatory
3.14%
Enterprise and Sustainable
Development
3.03%
Roads, Transportation and Fleet
5.78%
70

Page 71

As the largest Services within Community and Enterprise, and with the highest absence levels, Facilities, Waste and Grounds, and Roads, Transportation and Fleet
are the main drivers of higher absence rates, however as shown by Table 11, absence levels for Roads, Transportation and Fleet have reduced throughout the year.
Within these, only Fleet has a lower than average absence rate (5.26%) and Waste sits at the highest with 10.83% (and rising across the year).
Short Term and Long Term absence rates for each Service are shown in Table 12:
Table 12: Short Term / Long Term Absence Rates by Service
Facilities, Waste and Grounds Planning and Regulatory  
Enterprise and Sustainable Development Roads, Transportation and Fleet  
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
-
0.50
1.00
1.50
2.00
2.50
3.00
3.50
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
-
1.00
2.00
3.00
4.00
5.00
6.00
7.00
Short Term sick % Long Term Sick %
Linear (Short Term sick %) Linear (Long Term Sick %)
71

Page 72

Section 5.2: Absence Categories
The total number of working days lost in the year 2023/24 for Community and Enterprise Resources was 53, 854, which accounts for 26% of all working days lost by
the Council. Table 13 shows the number of working days lost due to specific categories of absence for the year 2023/24. The top four Reasons for absence are
shown and the remaining categories aggregated into Other.
Table 13: Days Lost Due to Absence Reason 
Musculoskeletal absences were the leading reason for absence, accounting for 30% of absences throughout the year, followed by Psychological (28%), Respiratory
(17%) and Stomach (9%).
Due to the year to year fluctuation of total numbers of absence, absence proportions are compared below. Each absence reason has been calculated as a
percentage of ‘working days lost due to absence reason’ divided by ‘total working days lost in year’ to illustrate changes in absence across the years 2022/23 –
2023/24.
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
Musculoskeletal Psychological Stomach Respiratory Other
72

Page 73

Table 14: Absence Reasons – Year to Year Comparison 
The Resource absence rate decreased in 2023/24 vs. 2022/23, however the leading reasons for absence - Musculoskeletal and Psychological – both saw
proportional increases of 2 points, accounting for 58% of all absences.
This trend is in line with the rest of the Council, where the proportion of Psychological absences has increased across all Resources year on year. Across the 2 year
period, the proportion of Psychological absences in Education (on Average) rise from October throughout the Autumn / Winter Period before peaking in May,
accounting for 39% of all absences. 
0% 5% 10% 15% 20% 25% 30%
Musculoskeletal
Psychological
Stomach
Respiratory
Other
2023/24 2022/23
73

Page 74

Community and Enterprise Resources Strategic Workforce Action Plan 2025 - 27
Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications       
Recruitment,
attraction and
retention
Promote the Council
as an employer of
choice through job
adverts
Attract more
candidates for hard to
fill posts
Eg Facilities, Grounds,
Mechanics, HGV
Drivers, Roads
Operative 
Successful
recruitment
exercises with a wider
candidate pool
Head of Service and
Personnel Adviser
(recruitment) 
Revised recruitment
adverts will be
provided by the
recruitment team and
hirings managers will
provide context
relevant to specific
roles
Career progression
routes to be promoted
December 2025  and
ongoing throughout
duration of the plan
Within existing
resources
Develop career
pathways and
progression in
professional roles,
though links with
universities and
colleges
Progression and
development of
existing employees
into professional roles. 
Head of Service and
Personnel Adviser
(recruitment)
Learning and
Development Adviser
/ Service Managers
and HR Business
Managers
December 2025 and
ongoing throughout
duration of the plan
Within existing
resources
74

Page 75

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Continue to develop
‘grow you own’
approach. Specific
roles identified: HGV
Drivers, Mechanics,
Planners. Relaunch
of apprentice
programme in roads.
Talent pool of
developed staff to fill
professional roles as
they become available
Heads of Service and
Personnel Adviser
(recruitment) 
Learning and
Development Adviser
to identify qualification
routes and build on
existing links with
colleges and
universities
December 2025 and
ongoing throughout
duration of the plan
Within existing
resources
Succession planning
across all services 
Developed future
leaders identified to
replace departing
senior managers  
Learning and
Organisational
Development and
Manager
HR Business
Managers and
Resource
management teams
December 2025 and
ongoing throughout
duration of the plan
Within existing
resources 
Proactive recruitment
campaigns for hard to
recruit posts eg. 
Facilities, Grounds,
Mechanics, HGV
Drivers, Roads
Operative
Maintain staffing
levels  
Service Managers and
Recruitment team
Service Managers,
links with
employability and job
centres
June 2025 and
ongoing throughout
duration of the plan
Within existing
resources
Transformation Provide Training to
employees to support
legislative and policy
changes in sector
specific fields, e.g
Waste, Bereavement,
Employees with better
understanding and
knowledge of
requirements and
implications for role
Head of Service  Managers and
employees
April 2026 Within existing
resources
75

Page 76

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
EV Fleet and
Infrastructure
Having the skills to
support programmes
and/or projects and
innovation, eg Town
Centre regeneration
Successful progress
and delivery of
programmes/projects
Head of Service  April 2026 Within existing
resources 
Review of services to
make efficiencies and
improvements
Prioritised resources
to protect service
delivery 
Head of Service and
HR Business manager
Personnel Adviser
and Service manager
will progress the
implementation of
outcomes of the
review
December 2025 and
ongoing throughout
duration of the plan
Within existing
resources 
Progress the actions
identified as part of
the review of overtime 
Delivery of services
within core staffing
and reduce
requirement for
overtime 
Heads of Service HR Business
manager. The action
plan will be monitored
through overtime
updates to SMT
December 2025 Achievement of
savings target
identified 
Progress the actions
identified from the
review of
Efficient management
structure in place 
Heads of Service HR Business Manager March 2026 Achievement of
savings target
identified
76

Page 77

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
management
structures
Skills Gap Provide Leadership
development for
senior managers 
Skilled staff to deliver
key resource activity 
Heads of Service L&D Adviser / L&D
Board
March 2026 Within existing
resources 
Provide training to
digitally upskill the
workforce
Skilled staff to deliver
key resource activity
Heads of Service L&D Adviser / L&D
Board
March 2026 Within existing
resources 
Provide training to
raise awareness of
sustainability and
climate change
Awareness of action
required to reduce
climate impact
Heads of Service L&D Adviser / L&D
Board
March 2026 Within existing
resources
Provide training to
enable employees
recognise the impact
of trauma and
adversity to enable
the adoption the
trauma informed
principles
Embedding trauma
informed practice in all
aspect of social work
services 
Heads of Service HR Business manager
/ L&D Adviser / L&D
Board
March 2026 Within existing
resources
77

Page 78

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Identify steps required
to reduce Digital
exclusion
Employees able to
engage with digital
services across the
Council
Head of Personnel Head of IT services,
L&D Manager
December 2026 Within existing
resources 
Maintain ongoing CPD
in specific service
areas
Maintenance of
professional
development
standards
Heads of Services Managers as part of
appraisal process
March 2026 Within existing
resources
Delivery of key
Resource
activity
Monitor staffing levels
in line with statutory
requirements 
Developed and
available staff to
deliver key activity 
Flexibility in response
to demand
Heads of Service HR Business manager  March 2026 Within existing
resources 
Assess employee
implications of
achievement of net
zero
Developed and
available staff to
deliver key activity
Heads of Service HR Business manager 
All managers across
services 
March 2026 Within existing
resources
78

Page 79

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications
Maintaining
employee health
and well being
Improved employee
engagement across
service areas
Engaged employees
will contribute to
overall effectiveness
of services
Head of Personnel All managers across
services
March 2026 Within existing
resources 
Partnership working
with TUs
Continue to maintain
existing relations with
TUs improving
employee relations
and overall employee
experience
Head of Personnel All managers across
services
March 2026 Within existing
resources 
Annual review of
employee wellbeing
initiatives and
campaigns to provide
to improved supports
and increase
resilience of
employees 
Supported, engaged,
and motivated
workforce 
Head of Personnel All managers across
services
March 2026 Within existing
resources 
Promote employee
recognition through
appraisal 
Supported, engaged,
and motivated
workforce 
Head of Personnel All managers across
services
March 2026 Within existing
resources
79

Page 80

Priority/Identified
Needs
What are the
future workforce
priorities based
upon your
supply and
demand
analysis?
Actions
What specific
actions that are
needed to deliver? 
Anticipated
Outcomes 
Lead Officer
Who is responsible
for delivery? 
Support
What support do we
need? Who else
needs to be
involved?
Timescale
What are the
timeframes for
delivery?
Financial
Implications 
Employee recognition Supported, engaged,
and motivated
workforce 
Head of Personnel All managers across
services
March 2026 Within existing
resources 
Mentoring and
coaching
Supported, engaged,
and motivated
workforce 
Head of Personnel All managers across
services
March 2026 Within existing
resources 
Refresher training
absence management 
Supported, engaged,
and motivated
workforce 
Head of Personnel All managers across
services
March 2026 Within existing
resources
80

Page 81

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Employability Performance Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee on the performance of the Council’s Employability Service,
South Lanarkshire Works
 seek approval to enter into a ‘Teckal’ contract with Routes to Work South (RTWS)
for the delivery of employability programmes during 2025/2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the performance of the Employability Service be noted; and
(2) that the proposal to enter into a ‘teckal’ contract with RTWS is approved.
[1recs]
3. Background
3.1. South Lanarkshire Works, the Council’s Employability Service, delivers and funds a
range of programmes designed to develop the work readiness skills of people and
support them to progress to sustainable employment. 
3.2. The services can be broadly split into three categories:
 senior-phase work-based learning programmes which are delivered to school
pupils in S4-S6 as part of their curriculum 
 keyworker based employability support delivered to key priority groups
 learning / training and skills development provision which is delivered to meet the
needs of people engaging with keyworker services  
3.3. Case studies demonstrating the impact of the programme on individuals are included
at Appendix 1.   
4. Senior Phase Work Based Learning
4.1. South Lanarkshire Works delivers a range of work-based learning programmes on
behalf of Education Resources. The programmes are delivered in partnership with
local colleges and are timetabled to form part of a pupil’s senior phase curriculum. 
7
81

Page 82

4.2. Foundation Apprenticeships (FAs) are a national senior phase option, funded by Skills
Development Scotland (SDS) and the Scottish Funding Council (SFC) and designed
to allow pupils in S5-S6 to gain valuable, real-world work experience and access to
work-based learning while they are at school. Pupils attend college and work
placements up to two days a week while at school and the qualification achieved is
delivered at level 6 (equivalent to a Higher) of the Scottish Credit and Qualifications
Framework (SCQF). 
4.3. South Lanarkshire’s FA programme is delivered as a partnership between the Council,
South Lanarkshire College and New College Lanarkshire with the colleges delivering
the learning element and the Council managing the overall programme including pupil
support, compliance and work placements. 
4.4. During the 2024/2025 academic year, 174 young people took part in Foundation
Apprenticeships with 106 completing and 95 achieving the full qualification. 9 achieved
a partial award and a further 35 are returning in 2025/2026 as planned to complete
year 2. All young people completing an FA have moved into a positive post-school
destination of employment or further learning. 
Table 1: South Lanarkshire FA Starts 2024/2025 
4.5. For the 2025/2026 academic year, a similar number of places were available,
however, there has been a slight reduction in uptake from schools with 93 pupils
starting the programme in August 2025 (not including year 2 returners). 
Table 2: South Lanarkshire FA starts 2025/2026 
Framework
1 year 
starts
2 year 
starts
2nd year 
returners Total
Accountancy 0 0 6 6
Business Skills 5 0 4 9
Creative and Digital Media  12 13 18 43
Children and Young People 8 31 20 59
Engineering  0 0 9 9
Healthcare 10 16 13 39
IT Software  0 0 9 9 
Total  35 60 79 174
Framework
1 year 
starts
2 year 
starts
2nd year 
returners Total
Business Skills 6 0 0 6
Creative and Digital Media  7 12 3 22
Children and Young People 9 18 19 46
Engineering  0 12 0 12
Healthcare 8 11 14 33
IT Software  0 10 0 10 
Total  30 63 36 129
82

Page 83

4.6. The GradU8 programme is a South Lanarkshire specific work-based learning option
available to pupils in S4 to S6. Delivery takes place in local colleges where pupils
attend one-day-per week to complete a vocational qualification at SCQF level 4 or 5.
In 2024/2025, pupils have been able to pick one of 12 subject areas, all designed to
offer progression in areas with employment progression opportunities. The
programme is delivered in partnership with South Lanarkshire College, New College
Lanarkshire and Glasgow Kelvin College. This partnership arrangement allows
colleges to make a financial contribution in the form of Scottish Funding Council credits
which pay for the learning and teaching element of the programme. Pupils are
supported in college by South Lanarkshire Works Vocational Development Workers
to engage effectively on the programme and to support transition planning for any
leavers following completion of the course.   
4.7. In addition to the college-based options, each school can also identify up to five young
people to take part in a long-term work placement as part of the GradU8 programme.
Young people attend their placement one day a week on the school’s GradU8 day and
placements are sourced by the Employability Service across Council and partner
workplaces and with local employers. 
4.8. In 2024/2025, 766 places were available to young people across 12 subjects at partner
colleges South Lanarkshire College, New College Lanarkshire, and Glasgow Kelvin
College. 582 young people completed the programme and achieved accredited
qualifications. For the new 2025/2026 academic year 806 places have been allocated
to pupils with the programme commencing in August 2025. As in previous years it is
likely there will be some change in figures prior to the October break when the cohort
number is set. 
Table 3: GradU8 completers and starts by subject 
GradU8 subject 2024/25
Completers
2025/26
Starts
Beauty 50 68
Childcare 67 76
Construction 117 92
Creative & Digital 34 50
Engineering 45 62
Hair & Barbering 63 68
Healthcare 32 72
Horticulture 7 14
Hospitality 44 52
Make-up Artistry 45 68
Sport & Recreation 19 40
Uniformed Services 42 76
Work Experience  17 68
Total 582 806 
5. Keyworker-based Employability Services
5.1. The keyworker-based employability services delivered and funded by South
Lanarkshire Works are designed to meet the needs of key priority groups experiencing
barriers to employment. All participants are supported by a named keyworker who
supports them to develop and complete an individualised action plan, which includes
access to a range of training and employability provision. 
83

Page 84

5.2. The keyworker-based services are predominantly funded externally from the Scottish
Government’s No-one Left Behind programme and UK Government Shared Prosperity
Fund. These services, along with the learning and training provision set out at section
6, are agreed with the South Lanarkshire Local Employability Partnership (SLLEP)
and set out in an Annual Investment Plan (AIP) which is returned to Scottish
Government. 
5.3. All programmes are delivered in line with the Scottish Government’s Scottish
Approach to Employability which includes:-
 dignity and respect, fairness equality and continuous improvement 
 provides flexible and person-centred support
 is straightforward for people to navigate 
 integrated and aligned with other services
 provides pathways into sustainable and fair work 
 driven by evidence including data and the experience of users
 support more people to move into the right job at the right time 
Table 4: Key Priority Groups and Services 
Key priority group  Keyworker Service  Delivery Partner
Young people in the last
6 months of school 
Aspire South Lanarkshire
Council (SLC)
Young people aged 16-19  AspireWorks SLC
Adults with barriers to
employment 
Gateway to Employment Routes to Work South
People with long term
health barriers
Gateway (Intensive) Routes to Work South
People with learning
disabilities 
Supported Employment SLC
Parents from the
following groups: 
 Lone parents
 Parents or children
with a disability
 Parents with 3 or
more children
 Parents from a
minority ethnic
background 
 Parents with a
youngest child
under 1
 Families with a
parent under 25
years 
Supporting Families 
Making it Work 
SLC
Routes to Work South 
84

Page 85

6. Employability Learning and Training Provision
6.1. All participants engaging on a keyworker-based programme have access to a range
of provision. This provision may include activity funded by the South Lanarkshire
Works including activity delivered by keyworker services and training or learning
activity delivered on a procured basis by local partners. Provision can also include
health and wellbeing supports, training allowances and access to waged training
programmes. 
6.2. The South Lanarkshire Local Employability Partnership’s operational sub-group meets
regularly to identify emerging needs and agree provision to be funded as part of the
Annual Investment Plan. Provision available in 2025/2026 includes:   
Table 5: Employability Learning and Training Provision 2025/2026 
Programme Description  Provider
Supported
Volunteering 
This VASLan programme provides
tailored volunteering opportunities
to employability participants within
local third sector organisations 
VASLan 
Employability
Academy 
Training and learning opportunities
delivered by South Lanarkshire
College in response to caseload
requirements 
South Lanarkshire
College 
Rise, Reach and
Impact
Employability groupwork
programmes targeted at young
people engaging with Aspire and
AspireWorks
Routes to Work South
Winter / summer
leaver
programmes
College based learning to support
young people in their last 6 months
of school 
South Lanarkshire
College
New College
Lanarkshire 
QTS Rail
Academy 
Rail sector-based training
programme linked to the East
Kilbride Enhancements Project 
QTS / Routes to Work
South
Vocational tasters
/ sector training
Procured programmes to support
participants to complete
introductory training in sectors on a
demand-led basis. Provision has
included construction, hair and
barbering and social care, HGV 
Various procured
providers 
Routes to Work South
Work tasters and
placements
Employability participants can
access work placements as part of
their action plan and training
allowances of £25 per day are
available to support engagement 
SLC / Local employers 
85

Page 86

Project Search This programme supports young
people with learning disabilities to
take part in a programme of work
placements, employability support
and training delivered at University
Hospital Hairmyres in partnership
with NHS Lanarkshire and New
College Lanarkshire and ISS 
SLC / Project Search 
NHS and SLC
Demonstrator
The programme provides 6 month
waged part-time work placements
to parental employability
participants. Placements are based
within NHS Lanarkshire, SLC
Facilities Services, SLC Grounds
Services, ISS (Hairmyres Hospital)
and the State Hospital Carstairs 
SLC / NHS Lanarkshire
and ISS
Employer
Recruitment
Incentives
Funding is available to support
SMEs creating additional Fair Work
vacancies to support employability
participants into employment 
SLC   
6.3. Connect2 Renewables Employability Initiative provides enhanced support to
complement the range of programmes offered.  OnPath Energy provides the
Community Benefit funding for Connect 2 Renewables and is available to participants
that reside 10km from either Kype Muir Windfarm in Strathaven or Middle Muir
Windfarm in Crawfordjohn.  Support provided includes Employer Recruitment
Incentives, Into Work Grants, Further Education Grants and Training.   
7. Programme performance
7.1. In 2024/2025, the Council’s employability programmes supported 2,622 people from
the key priority groups identified above. This is an increase from 2,257 in 2023/2024.
787 people progressed to further education or training including participants
undertaking certified learning as part of their engagement with the Gateway to
Employment Programme. A total of 694 people progressed to employment during the
year.   
7.2. In 2025/2026, 800 people have registered with employability services up to the end of
August 2025 with 323 accessing or progressing to education or training and 285
moving into employment. 
86

Page 87

Table 6: Employability performance by Key Priority Group 2024/2025 
Registrations
Progressions to
training /
education
Progressions to
employment 
Young people in last 6
months of school
741 407 54
Young people age 16-19 337 120 70
Adults with barriers to
employment
704 132 348
People with long term
health barriers
327 22 78
People with learning
disabilities
65 18 19
Parents 448 88 125
Total 2622 787 694 
Table 7: Employability performance by Key Priority Group 1 April  – 31 August
2025 
Registrations 
Progressions
to training /
education 
Progressions
to employment 
Young people in last 6
months of school
90 87 10
Young people age 16-19 208 100 39
Adults with barriers to
employment
261 64 158
People with long term
health barriers
65 15 28
People with learning
disabilities
32 14 11
Parents 144 43 39
Total 800 323 285 
8. School Leaver Destinations and Post-School Tracking 
8.1. A key focus and performance measure of the Employability Service is to improve the
proportion of school leavers that progress to a positive destination of education training
or employment. The Service works closely with all secondary schools and Skills
Development Scotland to identify those young people most at risk of becoming
unemployed when they leave school and tracking their post-school destinations. 
8.2. The most recent School Leaver Destination Report (SLDR) showed that 96.4% of
those pupils who left school in academic year 2023/2024 entered a positive
destination. This was a slight decrease from the previous year (96.9%) but maintained
South Lanarkshire’s target to be above the national rate for the 9th year in a row and
placed South Lanarkshire 10th highest of the Scottish local authorities. The
AspireWorks keyworker employment service set out above in paragraph 5.3 is counted
as a positive destination for SLDR purposes and recorded under ‘training’.  
87

Page 88

Table 8: Positive School Leaver Destinations 2018/2019 – 2023/2024 
Year
Positive destination
rate - South
Lanarkshire 
Positive destination
rate - Scotland
2023/24 96.4% 95.7% 
2022/23 96.9% 95.9%
2021/22 96.2% 95.7%
2020/21 96.2% 95.5%
2019/20 94.8% 93.3%
2018/19 95.7% 95.0% 
Table 9 : Destination breakdown 2023/2024 
Destination  South Lanarkshire  Scotland
Employment 19.7 23.1
Higher Education 45.8 40.8
Further Education 25.5 26.4
Training 5.1 3.9
Personal Skills
Development - 0.9
Voluntary Work - 0.6
Unemployed seeking 1.8 2.2
Unemployed not seeking 1.4 1.9
Unknown 0.3 0.3   
9. Participation Measure and Post-school Tracking 
9.1. Since 2016, Skills Development Scotland have published the Annual Participation
Measure (APM) which reports on the economic and employment activity of 16–19-
year-olds in Scotland and is the source of the Scottish Government’s National
Performance indicator “Percentage of young adults (16-19 year olds) participating in
education, training or employment. This measure has a wider focus than the school
leaver destination and includes young people who are at school, in college, at
university, at work or participating in employability support. The most recent report was
published in August 2024 and showed 94% of young people aged 16-19 in South
Lanarkshire were participating, this was higher than the Scottish rate of 93.3% and an
increase from the previous year.  
88

Page 89

Table 10: Participation Measure 2019 to 2025 
Year   South Lanarkshire  Scotland  
2025 94.0% 93.3%
2024 93.8% 92.7%
2023 93.3% 92.6%
2022 92.3% 92.4%
2021 92.8% 92.2%
2020 92.7% 92.1%
2019 92.6% 91.6% 
9.2. Since 2022, the Employability Service has led a process of joint tracking between the
Council and Skills Development Scotland to improve the participation measure by
identifying young people, including through home visits, with an unconfirmed or
unemployed status and offering appropriate support or confirming destinations. During
2024/2025 the Service has carried out almost 643 home visits, a breakdown of which
is provided in Table 11. 
Table 11: Participation Measure Home Visits 2024/2025 
Total home visits 643 -
Destination confirmed 172 26.7%
Referred for employability support 106 16.5%
Declined employability support 95 14.8%
Confirmed to be engaging with DWP 9 1.4%
Unable to make contact, moved address 39 6.1%
Unable to make contact, no response  221 34.4% 
10. Routes to Work South Teckal Contract 
10.1.  An element of the Annual Investment Plan is delivered on the Council’s behalf by
Routes to Work South (RTWS), a South Lanarkshire based charity that operates as
an Arms-Length External Organisation (ALEO). These programmes are managed
through a contract supported by Teckal arrangements. A transformational review of
Routes to Work South is currently underway and will be the subject of a separate
committee report. 
10.2. Standing Order 3.7 of the Council’s Standing Orders on Contracts, requires Committee
authority to be obtained for the award of a contact using the ‘Teckal’ exemption. A
‘Teckal’ contract is a legal exemption to the public procurement rules where a public
authority does not have to tender a public contract and the contract can be awarded
directly by the Council to a separate legal entity, in this case RTWS, subject to certain
requirements being met. 
89

Page 90

10.3. The three requirements to justify the use of the ‘Teckal’ exemption for the award of
this contract are:- 
 the Council exercises control over RTWS similar to that it exercises over its own
departments 
 RTWS carry out over 80% of their activities for the Council; and 
 there is no private sector ownership in RTWS 
10.4. All the relevant requirements to justify the award of this contract using the ‘Teckal’
exemptions are met. 
10.5. RTWS’ delivery is agreed on an annual basis and set out through a contract with
associated output and outcome targets. The programmes to be delivered through the
2025/2026 contract form a key element of the Annual Investment Plan agreed with
SLLEP and are detailed below. All programmes are funded externally by the Scottish
Government’s No-one Left Behind fund or the UK Government’s Shared Prosperity
Fund and have been agreed with the South Lanarkshire Local Employability
Partnership.   
Table 12: RTWS Proposed Activity 
Programme  Description 
Gateway to
Employment 
Keyworker-based employability
programmes targeted at adults with
barriers to employment  £1,013,000
Gateway to
Employment
(Health/intensive)
Intensive support programme for
adults with long-term health barriers to
employment £250,000
Making it Work 
Keyworker based training and support
targeted at parents  £500,000
Reach and Impact 
Groupwork and employability training
programme targeted at young people
aged 16-19 £300,000
RISE 
Confidence building and personal
development groupwork targeted at
school pupils at risk of becoming
unemployed. 
£200,000
EK Hub
Contribution to running costs of the
employability hub in East Kilbride
centre. 100,000
Aspire 
Provision of Keyworker support to the
Aspire programme 
100,000 
What I Need
Pilot programme to engage
economically inactive people in early-
stage employability activity in targeted
neighbourhoods  200,000
Total  2,663,000 
90

Page 91

10.6. Approval is sought to enter into a contract with RTWS for the delivery of the
2025/2026 employability services. 
11. Employee Implications
11.1. There are no employee implications arising from this report. 
12. Financial Implications
12.1. There are no financial implications arising from this report. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained within this report. 
14. Other Implications
14.1. The are no risks or other implications arising from this report. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment is
required. 
15.2. The planning and delivery of the employability service’s programmes is subject to
ongoing consultation and engagement with a range of Council services and local and
national partners. This includes the development and delivery of the Annual
Investment Plan through the South Lanarkshire Local Employability Partnership which
includes representation from Skills Development Scotland, NHS Lanarkshire,
Department of Work and Pensions, VASLan, South Lanarkshire College and Routes
to Work South. 
David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work to recover, progress and improve
 Our children and young people thrive
 Thriving business, fair jobs and vibrant town centres
 Inspiring learners, transforming learning, strengthening partnerships 
91

Page 92

Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Douglas Hashagen – Employability Manager 
Tel;  0141 584 2915 
Email; Douglas.Hashagen@southlanarkshire.gov.uk 
92

Page 93

Appendix 1 
Employability Case Studies 
Ahmed (AspireWorks)
Ahmed was referred to Aspire Works by his work coach from DWP.   Ahmed is a refugee
and fled civil war in his home country, he has been affected by homelessness and housing
exclusion in the past and when he came to the UK he was placed in a Children’s House, he
is now in his own tenancy.  When he arrived in Scotland, he was unable to speak any
English but has since been attending ESOL classes and improving fluency and
comprehension of English language. 
Support given by AspireWorks including setting long and short-term goals to improve
employability skills, job applications, CV writing and interview techniques.   Ahmed 
also received support on financial and housing advice and a referral to counselling was
made.   Ahmed has recently been offered employment at Angard Staffing, who work in
partnership with Royal Mail recruitment, as a Mail Sorter.   
Ava (AspireWorks)
Ava was referred to Aspire Works for support when she left school.  She aspired to gain
employment but lacked confidence and was anxious about the prospect of attending an
interview.  Ava engaged well with her Vocational Development Worker and was supported
with job searching, creating a CV and interview techniques, these were all part of her action
plan.  During her support she was also helped to set up a bank account so that if she did
gain employment, she had this in place.   
Ava became more confident and was successful at interview for Planet Play where she took
up full time employment with them.   Ava is enjoying the fast-paced nature of her job
working in the kitchens and is thriving working in her new team. She is looking forward to
being able to learn new skills and build on what she’s already learned in her short time with
the company
In addition to this Ava has a college place for August this year at South Lanarkshire College
to sit Higher English and National 5 Maths.
Quote from Ava “I have thoroughly appreciated my time with the Aspire Works team. Eddie
and Josh have helped me in getting a job and gaining experience after leaving school.
Since working with them, I've gotten a job that I'm really enjoying and I'm starting college
this August with the help of them both.” 
Kaia (GradU8)
Kaia was referred to the GradU8 programme by Uddingston Grammar as she wanted to
pursue a career in childcare. Kaia has Autism and Dyslexia. She is a very determined
individual, and she would not let this get in the way of achieving her goal. She dealt with all
of the coursework and successfully completed the GradU8 Childcare course at South
Lanarkshire College.   
Kaia enjoyed the GradU8 programme so much that she decided to apply for a place on the
Foundation Apprenticeship in Social Service Children & Young People.  The experience
and knowledge gained on the GradU8 programme helped her to gain an FA place.  She will
complete the 1-year programme at South Lanarkshire College, attending college every
Thursday to complete her NPA  as well as attending a work placement in a South
Lanarkshire Nursery on Tuesdays to complete her SQA qualification. 
93

Page 94

Cameron (Gradu8 Work Experience)
Cameron was referred to Gradu8 by his pupil support teacher, he had a keen interest in
working with tractors and was extremely motivated and driven to move into employment in
this area when he left school. Before a work placement was identified for Cameron, he
attended a 4-week pre-employment course to prepare.   During this he gained his SQA
Employability Award Level 4 along with increasing his confidence, skills and knowledge of
being in a real work environment. Cameron was then placed with an employer; however,
Cameron lives in Forth and his work placement was on the outskirts of Lanark, therefore he
had a bus journey and a considerable walk to get to his placement. Cameron was happy to
undertake this travel plan as he specifically requested this employer. During his work
placement Cameron was supported by his Vocational Development Worker who provided
him with PPE and regular reviews were carried out.     
Cameron impressed the company so much with his attitude, motivation and willingness to
learn that they offered him a Modern Apprenticeship in mechanics, focused on tractor
maintenance and repair. 
The workshop manager said of Cameron.
“Cameron has always been on time; he has always been keen to learn and asks questions.
He has lovely manners when speaking to customers. We are very keen to take Cameron as
an apprentice.” 
Aidan  (GradU8) 
Aiden was a school pupil, living with his gran due to difficult home circumstances.    Aidan
was caught up in some risk-taking behaviour both in school and in the community. 
Aidan became increasingly disengaged with school but welcomed the opportunity to join the
GradU8 Construction programme at New College Lanarkshire where he would attend one
day a week.  In addition to this Aiden also started a summer leaver programme, 3 days per
week (January to June 2025), while continuing with his GradU8 studies.  Aiden also had the
support of a Vocational Development Worker. 
Aidan thrived in the college environment. He demonstrated excellent commitment, never
missing a single session, and quickly became a delight to teach. With the support of his
VDW, he grew in confidence and ability, impressing college staff to the extent that they
encouraged him to apply for a pre-apprenticeship course, which he has now successfully
started. 
David (Aspire)
David was referred to Aspire by his school; he had disengaged from school for a long
period of time and suffered from anxiety.  When his Vocational Development Worker first
met him, he would not leave his home except to go to the gym. Over time his worker met
with him twice a week and he gradually felt more able to meet in the community.  His
confidence continued to grow and as part of his Aspire support he attended the RISE
programme, this was an enormous achievement for David and he made friends with some
of the other young people on the programme. This led to him becoming more social and
meeting with them outside his home.   
David was interested in sports and he was supported to apply for a college course in Sport
and Fitness which he received an offer for.  He is thoroughly enjoying this and has not
looked back.  In addition to this he started working at McDonalds.   
94

Page 95

D (Supporting Families)
D is Romanian but had been in Scotland for a few years, initially with her husband and two
children.   She was referred to Supporting Families when her daughter attended at an early
years centre in Rutherglen. D was a lone parent and looking for support to gain
employment. She had been at college but recently left due to financial restraints. D was
living in temporary accommodation as she had fled domestic abuse.  D was also looking for
support with her health and wellbeing and current financial situation. Following completion
of a holistic needs assessment we provided employability support, referral to One Parent
Scotland Family for financial support, linked in with housing mediation and a referred to
Smart Works for interview clothing and support. During her time with Supporting Families D
also engaged with holistic therapies to improve her health and wellbeing.   
D was supported to access paid work experience through the Demonstrator programme
where she took part in a placement with the Council’s Facilities Service and on completion
she successfully and gained part time employment as a cleaner. 
Jack (Aspire)
Jack was referred to Aspire as he had disengaged from school. When he first met his
Vocational Development Worker, he aspired to gaining employment but lacked confidence.     
His VDW offered Jack a place on the RISE programme, this takes place over 12 weeks, 3
days per week with a focus on personal development, health and wellbeing and
employability skills. Jack enjoyed his experience on RISE and continued to work with his
VDW to looking at work placements.  Jack lived in a remote area of Clydesdale and this
was a challenge.   
Jack and his VDW identified a local garage for a work placement.   At first the garage was a
bit hesitant but agreed to take Jack on a work placement with the possibility of offering a
Modern Apprenticeship at the end.   Jack started the work placement and really enjoyed
this, the employer were keen to take Jack on and we explored the possibility of funding an
Employer Recruitment Initiative through Connect 2 Renewables which was agreed. 
Jack is now currently undertaking a Modern Apprenticeship in Mechanics; he attends New
College Lanarkshire as part of this and is delighted at his outcome. 
K (Supporting Families)
K, was referred to the Supporting Families Programme from Cairns Primary. She was
looking for support to increase her skills by going to college and ultimately gaining
employment in a better paid job. K recently had another child and her family of 5 were living
in a 2-bedroom council flat.  She had been subject to ongoing noise from the upstairs flat.   
K was looking for help to move into better paid employment or further education.  After
returning to her former job when her maternity leave had ended, she had to resign as she
could not afford childcare.  She then decided to rethink her career path and aspired to
become a primary teacher.   
K was also hoping for support to get rehoused in a larger council house within SLC housing
and to address the anti-social behaviour in her current housing.
K engaged well on the programme and was given a wraparound support package which
included financial/money advice, housing support, foodbank and wellbeing packages,
support to look into pathways to Primary Teaching, health and wellbeing interventions.   
K successfully applied to Glasgow Clyde College for Entry to Primary Education. On
successful completion of the course, she is guaranteed an interview for PGDE at University
of Strathclyde.   The family had been on the SLC housing waiting list for over a year and an
offer has now been made for a 3-bedroom house in East Kilbride.  
95

Page 96

“Hazel has been very helpful towards all our situations we have been going through. She’s
been a great listening ear as well as going out of her way to help. I really feel that South
Lanarkshire should have more people like Hazel helping families because it takes a lot of
the burden away. Sometimes, when I didn’t have anyone to talk to about the issues we
were facing, I knew I could speak to her which gave me ease straight away. She’s gone
above and beyond to be available to me when I needed her” 
Ewan Arnott – Supporting Families   
Ewan was referred to by Routes to Work South. Ewan is a lone parent diagnosed with
stress and psoriasis and has an 8-year-old child who also has health issues. Ewan was
working as an HGV 2 driver through an agency on a zero-hour contract but was struggling
to get shifts and some weeks would only be offered 1 to 2 shifts per week which was not
enough for him to sustain an acceptable standard of living. Ewan frequently used food
banks and was often faced with the choice of either eating or heating his home. 
Ewan was looking for support towards gaining an HGV1 licence which he felt would benefit
him greatly to secure permanent full-time work which would allow him to lead a viable and
consistent life and address his current issues. 
Ewan undertook HGV 1 training over a 2-week period and passed this.  He immediately
sourced temporary employment and commenced as an HGV 1 Driver with Craib Transport
and has now secured permanent employment with Blue Arrow.  Ewan was supported by
weekly calls and meetings. Ewan was enthusiastic, keen, and determined and showed
exceptional determination in his goals to achieve his HGV 1 Licence and subsequent
employment.   
Andrea (Demonstrator)
Andrea is a parent in a couple with 3 children, one of whom had health issues.  Andrea was
looking for permanent, term-time employment, to suit with childcare needs and a guarantee
of regular income. Andrea was successful in gaining a 5-month placement as Facilities
Assistant (school catering) on the Demonstrator Programme. Training was provided in
Mental Health Awareness, Confidence Building and general SLC procedures. Support
sessions were also provided to Andrea to facilitate her required e-learning for the post. 
Adreas long term goal was to move into employment as a school support assistant within
SLC.  We agreed that Andrea would build her knowledge of SLC and the school
environment while working with Facilities, meanwhile, we would seek to apply for school
support vacancies. 
During her time on the programme Andrea was referred to Smart Works for interview
clothing and interview skills training, she was also referred to Money Matters for financial
advice.   
During her placement a recruitment campaign for School Support Assistants was launched.
We worked on Andrea’s application, researched possible interview questions and practiced
interview techniques on. Andrea was successful in an interview and now has secure,
permanent employment that works around her childcare needs. She can drop off/collect her
children from school while also being able to contribute to the household financially. 
Andrea’s confidence has improved and she’s feeling really positive about her next steps as
a School Support Assistant.    
96

Page 97

“The Demonstrator Programme has been a godsend to me.  It has given me the self-
confidence that I lacked when it came to getting the job that I wanted.  With help from the
team, I secured an interview for School Support Assistant and successfully get the job. 
Whenever I felt unsure of myself, Nicola was always there offering support.” 
Lara (Project Search)
Lara was referred to Project Search by her Aspire Vocational Development Worker.  Lara
joined the programme not really knowing what she wanted to do for work or what the
expectations of working were.  She had many personal challenges to overcome, struggling
with having appropriate conversations and oversharing personal information being the
greatest.  Lara participated in all classroom-based activities in the programme, asking
questions and really taking on board the advice and guidance on offer from both the
lecturer and job coach.  This coupled with her enthusiasm and dedication to the work
placements she completed saw Lara grow massively in confidence, communication,
personal development and job readiness. Lara secured part time employment on
completion of the course with the host employer ISS Facilities Management at Hairmyres
Hospital as a kitchen assistant. 
Ben (Project Search)
Ben applied for DFN Project Search via New College Lanarkshire’s website.  Ben was
extremely keen to move into employment however struggled with making friends and new
environments. With help and support from his job coach, Ben completed three
placements.  He received great feedback from each placement, helping him grow in
confidence.  The daily classroom activities offered Ben peer support and social interaction,
allowing him to form strong friendships and bonds with fellow participants, again adding to
his confidence and self-esteem. 
Ben secured part time employment on completion of the course with host employer ISS
Facilities Management as a hospital porter at Hairmyres. 
Ben (Supported Employment)
Ben’s anxiety and additional support needs made it tough for him to return to school for his
senior years, so he decided to leave and look for work instead. That’s when he was referred
to the Supported Employment Team, who helped him create a personal action plan and set
goals for his future. He met with his Vocational Development Worker weekly in the
community to build his employability skills and joined our Rural Peer Group, where he
connected with others and built confidence in a supportive environment. These experiences
helped Ben grow in confidence, communication, and independence. With his worker’s
support Ben applied for a Modern Apprenticeship in Welding with BHC, a local employer.
He got help preparing for his interview—including vouchers for interview clothing—and his
hard work paid off!
Ben was offered a four-year apprenticeship and started in January. He says, “I’m only 16
and already have my dream job!!”
Ben and his employer will continue to receive aftercare support to ensure he thrives in the
workplace. 
Gateway to Employment - Jason 
Jason came to Routes to Work South after being unemployed for a year, struggling to
secure work despite having completed admin qualifications at college. With no practical
experience and repeated unsuccessful applications, he needed support with job search
skills and interview techniques. By attending the weekly job club, Jason built confidence,
got to know the RTWS team, and received tailored help with applications, cover letters, and
interview preparation.
97

Page 98

Through one-to-one guidance, mock interviews, and participation in CV and interview skills
workshops, Jason steadily improved his confidence and presentation. He also benefited
from practical support, such as clothing and travel assistance for interviews. His
determination paid off, and Jason secured an Admin and Customer Service role within the
public sector — achieving the goal he had set for himself when first joining RTWS. 
Kiki – (Demonstrator Programme)
Qi Shi (Kiki) was visiting a friend in Scotland when Covid struck, and she was forced to stay
in the country. During her time here she met her partner and became pregnant, and by the
time her son arrived she and her partner had parted ways.   Kiki applied for refugee status
as if she returned to China as a single parent, Kiki feared that her son would be taken away
from her or that they would become homeless. Now almost four years on, Kiki was focused
on providing a better future for her and her son, when she saw the Demonstrator
programme advertised. The programme offers parents the opportunity to complete a 6-
month paid work placement.  She applied for the programme and was successful in gaining
an HR administrator role at The State Hospital, Carstairs. Kiki began the programme in
January 2025, where she worked 25 hours a week over 5 days which was the perfect
balance for her family life. 
She received support from colleagues and management in The State Hospital as well as
her key worker who helped her develop her written and spoken English skills as well as
expanding her social skills and friendship circle.   Kiki also successfully completed South
Lanarkshire College Employability Academy’s Pre-NHS course which ran for two days a
week over 6 weeks and covered several topics including IT skills, sign language and first
aid. 
Kiki has since successfully gained a position with Morrisons Supermarkets as a customer
support colleague, Kiki states ‘’This job has given me a chance – and hope for the
future. It has changed our lives and helped me build up a level of skill that I hope will
transfer well in another role.’’ 
Djalia (Making it Work)
Djalia, originally from Algeria and now living in Cambuslang with her family, presented to
RTWS facing multiple barriers—including limited household income, childcare
responsibilities, cultural and language differences, and low confidence. Through building a
strong relationship we supported her to identify her aspirations and take clear steps towards
both personal development and employability. 
She has completed the SAFARI programme, gained an ILM qualification, and developed
practical skills through the Cook & Learn programme, including Health & Safety, First Aid
and Food Hygiene certifications. Djalia now attends job hub sessions regularly and
continues to grow in confidence, strengthen her networks, and build the skills and
experience that will help her achieve sustainable employment and a better future for her
family. 
John (Gateway Intensive)
John came to RTWS after being unemployed for two years. Having previously worked as a
borer and machine operator for many years; he lost his job due to sickness and struggled to
re-enter the labour market. With no CV, no interview experience, and little knowledge of
how to apply for jobs, John needed tailored one-to-one support to rebuild his confidence
and take the first steps back into employment.  
98

Page 99

Through personalised job search sessions, mock interviews, and practical support such as
interview clothing, RTWS helped John prepare effectively for opportunities. His CV was
shared with employers in his specialist area, leading to an interview with a RTWS employer
vacancy and subsequent job offer. With additional help to purchase tools and equipment,
John was able to start work again after a long break, regaining both employment and a
renewed sense of purpose. 
William (Foundation Apprenticeship)
William was a Carluke High School pupil and attended the ASN base at St Andrews and St
Brides High School.  William applied to undertake a Foundation Apprenticeship in Social
Services and Healthcare, which involved attending college and a work placement as part of
his school curriculum.  At first, he was very quiet but over the duration of the course he
grew in confidence and mixed well with all the other students.  William was supported by
the Practice Education Facilitators during his placements at Lanark Lifestyles daycare and
Wishaw General Hospital.  He was also supported and encouraged by his healthcare
lecturer the employability team to successfully complete his FA in Healthcare. Feedback
from college and placement was that William was a good student who integrated himself
into college life and work placement very well. William was a willing and very enthusiastic
student while on placement and always participated in activities with the service users. On
leaving school and completing his Foundation Apprenticeship William has secured a
college place studying HNC Healthcare practice. 
“I enjoyed the insight into college life and getting a feel for what it’s like after school while
also getting a feel for the job itself through the opportunity of 2 different placements which
for me let me experience a load of new things and see what I like and dislike in the job.
Additionally, it was really nice to meet and make new friends that have the same interest in
career as you and being able to share experiences.” 
Adele (Reach)
Adele joined the Reach programme after a period of being out of education, employment
and training, facing challenges around her mental wellbeing, finances and limited support
network. Despite these barriers, she was motivated to improve her circumstances and
identified personal goals around mental and physical wellbeing and financial stability. 
Through the Reach programme, Adele engaged fully with STEPS training, developing
confidence, teamwork and leadership skills. She went on to complete a 6-week work
placement where she gained excellent feedback for her professionalism and reliability,
although funding restrictions meant no permanent role was available. With support from her
keyworker, A began actively applying for alternative opportunities. 
By the end of the programme, Adele reported significant improvements in confidence,
wellbeing and optimism about her future. She credited the programme with helping her “find
direction and believe in herself again.” Her perseverance led to securing a permanent full-
time role as a Recreation Assistant (Lifeguard) with South Lanarkshire Leisure and Culture,
aligning with her interests in health, wellbeing and community engagement. 
99

Page 100

Stuart (Supported Employment)
Stuart was referred to Supported Employment via our employer Engagement team.  He had
been volunteering previously and felt that he now wanted to make moves to finding paid
employment.  Stuart had a wealth of academic and training skills. He had some
employment in admin-based roles in the past and through volunteering in a café
environment, discovered that he was a natural at face-to-face customer service and really
enjoyed working front of house. He was happy to engage with the Supported Employment
keyworker service to support him to further develop his skills and gain more work
experience in this area. 
Stuart met with his keyworker and they agreed an action plan to help him to gain further
practical skills and experience within the sector. With the help of his key worker, Stuart
secured a 6-week paid work placement at a community café which helped to build on his
confidence and experience.  His Vocational Development Worker, kept in regular contact
with both Stuart and the employer.  Stuart received excellent feedback and was offered a
permanent, part time contract as a café assistant at the end of his experience.   
‘Anne, my job coach, has helped arrange cafe work placements for me locally and I've
found her to be really great. She keeps in touch, checking in with me regularly to see how
things are going, as well as speaking to the managers to try sort out next steps for me. I'm
now going to be starting work in the David Livingstone Cafe! Thank you, Anne !!’ 
100

Page 101

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Business Gateway Lanarkshire – 2024/2025
Performance Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an overview of the activities and performance achieved during the first year
of an in-house delivery model of the Business Gateway Lanarkshire service
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the performance of the Business Gateway Lanarkshire service from 1 April
2024 to 31 March 2025 be noted; and
(2) that the revised targets for service delivery in 2025/2026 be approved.
[1recs]
3. Background
3.1. Business Gateway is a nationally branded service which is delivered by individual local
authorities to provide free, impartial advice and support to pre-start, new start and
existing businesses. 
3.2. Business Gateway has the following core service objectives:- 
 support more people with their ambitions to start a business
 support more businesses to survive and achieve their growth ambitions
 support more people with their aspirations for high business growth
 support more people from underrepresented groups to access mainstream
business support 
3.3. Underpinning the service objectives, there is a commitment to providing support
across a number of themes such as Carbon Reduction, Fair Work, Innovation,
Internationalisation, Digital Upskilling, Community Wealth Building, and Job Creation.
In addition, local authorities have the flexibility to tailor services to address specific
local needs and priorities. 
3.4. The service was insourced with effect from 1 March 2024 with North Lanarkshire
Council delivering the service on behalf of both Councils. North Lanarkshire Council
has managed the delivery of Business Gateway Services on behalf of both North and
South Lanarkshire Councils since 1 April 2008. Between April 2008 and February
2024, the service was delivered through a series of outsourced contracts.  
8
101

Page 102

3.5. Although the advisers and administrative staff for the in-house model are employees
of North Lanarkshire Council, Business Gateway Lanarkshire is managed via quarterly
Steering Group meetings where South Lanarkshire Council is represented by our
Head of Enterprise and Sustainable Development, Economic Development Manager
and Business Support Team Leader. The Council is also represented on interview
panels for the recruitment of new/replacement Business Gateway Staff. Business
Gateway Lanarkshire is the Council’s main provider of face-to-face business support
to the SME (Small and Medium-sized Enterprises) business base. 
3.6. Coinciding with the move to in-house delivery, Business Gateway National
implemented a new Service Specification which introduced new client classifications
to support customer engagement (commencing June 2024). This was to allow an
adviser to provide an intense level of support to a customer when required (determined
by client needs, ambitions and the potential for economic impact). The expectation
being that businesses offering higher growth potential would typically receive more
support. 
3.7. These two major changes meant that 2024/2025 was expected to be a year of
transition as staff faced the various challenges of integrating with a new provider, in a
new environment to provide a service which had a new delivery focus and service
specification. 
3.8. In addition to the national objectives, the following local priorities and objectives were
also agreed for 2024/2025 to align to the plans for both South and North Lanarkshire
Councils:- 
 increase the reach of Lanarkshire Business Gateway across all communities
including a renewed focus and take-up of services from residents from rural
communities and priority SIMD (Scottish Index of Multiple Deprivation) areas
 increase take-up of Lanarkshire Business Gateway services from under-
represented groups including long-term unemployed, economically inactive
residents, carers, young people, BAME, disabled people, restorative
justice/offenders
 increase focus and take-up of Lanarkshire Business Gateway services from
Social Enterprises, employee-owned businesses and co-operatives
 inspire and increase engagement and take-up of services by young people
focussing on enterprise pathways in schools, college (New College
Lanarkshire/South Lanarkshire College), University of West of Scotland, youth
groups
 working alongside sectoral plans provide Business Gateway services to key
sectors including construction, food and drink, creative industries, energy sector,
manufacturing/engineering services, tourism, transport and logistics
 delivery of support to town centre businesses to support South Lanarkshire/North
Lanarkshire town centre action plans
 increase engagement with non-engaged businesses
 businesses who require additional support to survive  
102

Page 103

4. Performance
4.1. Enquiries
4.1.1. Clients typically access the Business Gateway via the following routes with a follow up
call from an adviser within 3 working days:- 
 Business Gateway National Web Site
 Planning to Start Review
 Strengthen Your Business Review
 Digital Health Check 
 Enquiry Fulfilment and Research Service
 Telephone
 E-mail
 Via Webchat 
 Local Contact
 Telephone
 E-mail
 Social Media
 Client Referral
 Partner Referral - ecosystem 
4.1.2. Business Gateway Lanarkshire continues to receive approximately 3,000 enquiries
per year, of which 2,000 relate to Pre-Start/New Start business enquiries with the
balance of 1,000 enquiries being from established businesses. 
4.1.3. Performance in 2024/2025: 
Service Q1 Q2 Q3 Q4 Total Target % to Target SLC NLC
Total Enquiries 732 734 654 799 2919 3000 97.3% 45.6% 51.6%
Pre-Start 509 457 472 562 2000 2000 100% 45.3% 54.7%
Existing Business 225 275 182 237 919 1000 91.9% 46.2% 45.7% 
4.1.4. Enquiry levels overall for the year 2024/2025 increased by 115 on the previous year;
driven by the prestart/new business sector. The proportion of pre-start/new business
enquiries to existing business is in line with the expected norm of a 2/3 to 1/3 split. 
4.2. Business Start Up Service
4.2.1. A pre-start customer will be accompanied through an online tool called the “Planning
to Start” review which provides an insight into customer knowledge, requirements and
understanding of their business idea. In 2024/2025, 1,157 reviews were carried out
(529 South and 628 North). Of this figure over 50% were new to the service or had a
new business idea. This tool enables the Business Gateway Adviser to have a
meaningful ‘first’ engagement with the customer and to personalise an action plan to
support their journey. It also allows the adviser to identify those who are highly
engaging, have the potential to create employment, take on commercial premises
and/or achieve VAT threshold within one year of trading. These customers can be
classified as Pre-start Plus, enabling more intensive support to be delivered on a one-
to-one basis.  
103

Page 104

4.2.2. Once a pre-start client commences trading, the business is classified as either a New
Business or, if it has growth potential, as New Business Plus, with ongoing support
being provided during the first 12 months of trading. 
4.2.3. Business Start Up Performance in 2024/2025: 
Service Q1 Q2 Q3 Q4 Total Target % to Target SLC NLC
New Business
Starts
84 172 133 164 553 750 73.7% 33.2% 40.5%
New Business
Plus Starts
9 31 19 58 117 200 58.5% 22% 36.5% 
4.2.4. The New Business Start performance was lower than the target of 750 businesses
as a result of a number of contributing factors:- 
 transfer of staff – there was a short period of disruption due to the transfer of staff
from an external provider to the in-house service
 the new service specification by Business Gateway National and new client
classifications of Pre-Start/Pre-Start Plus and New Business/New Business Plus
required to be introduced with systems having to be adapted resulting which were
not finalised until late June
 IT challenges which delayed communicating and marketing to the client database
 recruitment of vacant posts
 external factors: Lower levels of new business bank accounts set up across
Lanarkshire from October 2024 to March 2025 (up to 70 less) and with
unemployment at low levels, job security is proving a better option for some
customers who are accepting job offers rather than becoming self-employed 
4.2.5. Of all the pre-start enquiries, only 28% were able to convert to starting a business (1:4)
which is in line with the Scottish Business Gateway National conversion rate. This is
a decline from previous years where Lanarkshire delivered 1:2. The decline is
attributed to almost 50% of the customers who then do not take any steps to start a
business. A number of reasons have been cited including customers had no intention
of starting a business, others have full time employment and do not wish to take the
risk or feel that the costs are too high. Whilst others who may indeed start, cannot be
categorised as a valid start claim due to lack of customer engagement and evidence
(as per the Business Gateway National rules). 
4.2.6. New Business Starts Plus targets were increased by 50% from 2024/2025 as it was
expected that the advisers would have more time to spend supporting these
customers. Whilst performance did not meet target, 36 more businesses were
identified than the year before. However, a key change is that the customer has to be
actively engaged and willing to work with the adviser to achieve their growth
aspirations. This remains a challenge with customers accessing initial support and
advice but then disengaging due to time constraints as they start their business.  
104

Page 105

4.2.7. Whilst the drop in start-up numbers is largely as a result of external market factors (as
outlined in paragraph 4.2.4), there has been a number of internal steps taken to review
performance and consider actions moving forward. These include:- 
 one to one meeting with all advisers to review performance, assess current pipeline
and set future requirements
 advisers reviewing their caseload to identify clients that have started but not
engaging
 advisers reviewing their start-up clients to identify any that meet New Business
Plus criteria
 a renewed focus on making contact with clients on the Bank Search database to
introduce the service and engage new clients
 a step up in e-mail marketing activities to stimulate client engagement
 the scheduling of monthly Business Start-Up Bootcamp Events
 intensive follow up of workshop/webinar attendees
 introduction of weekly monitoring and communication of progress against targets 
4.3. Existing Business Services
4.3.1. Businesses which have been trading for more than 12 months are regarded as an
existing business and are classified in one of the following three ways: 
 Business Gateway Growth – A business with plans to increase turnover by a
minimum of £200,000 within 3 years.
 Local Priority – A business that needs assistance to survive or achieve modest
growth and which satisfies local priority criteria – set by North and South
Lanarkshire Councils.
 Business Base – Any business that does not satisfy the above criteria but can still
access one to one adviser support 
4.3.2. Existing Business Service Performance in 2024/2025: 
Service Q1 Q2 Q3 Q4 Total Target % to Target SLC NLC
Business Gateway
Growth
2 15 40 60 117 150 78% 36.8% 41.2%
Local Priority 3 18 19 37 77 150 21.3% 24% 27.3%
Business Base 169 173 121 206 669 700 95.6% 49% 46.6% 
4.3.3. Business Base was a new measurement put in place, to recognise the volume of
customers entering the service and requiring support (who may not be able to fit the
high growth category or a local priority). Of the 919 enquiries that contacted the service
(one-year plus trading), approximately 73% were not in an existing category and
required support. This service includes at least one phone call or meeting and follow
up support which equates to a minimum of 60 minutes of adviser time. 
4.3.4. Both Business Gateway Growth and Local Priority categories performed lower than
expected with a drop of 10% year on year. Some of the reasons for this are detailed
in section 4.2.4 above. As the service embeds and there is an improved understanding
of what constitutes a Local Priority customer, this category will continue to improve.
However, it is a demand led service and reliance remains on the right type of customer
enquiry accessing the service. Moving forward, this will involve a change in focus on
marketing activities to utilise the key sector plans and Expert help programme to
engage with those business owners that will deliver an economic return.  
105

Page 106

4.3.5. Whilst the service is demand driven and impacted by external market factors; there
has been a number of internal steps taken to review performance and consider actions
moving forward. These have included:- 
 one to one meetings have been held with all the advisers to review personal
performance, assess current caseload and set future requirements
 advisers reviewing their portfolio to identify clients that may be suitable for Local
Priority or Business Gateway Growth services
 advisers have actively encouraged their existing clients to refer contacts into the
service
 internal processes have changed to refer potential growth clients from the Bank
Search database to the growth team for follow up – those setting up limited
companies from a sole trader
 there has been a step up in e-mail marketing activities to stimulate Existing
Business client engagement
 there has been the introduction of weekly monitoring and communication of
progress against targets
 active promotion of the new Expert Help Framework 
4.3.6. One example of the excellent service Business Gateway Lanarkshire has delivered to
support an existing business is Confidence Plus, an East Kilbride-based business,
who secured a major NHS Scotland contract for its innovative stoma care product
thanks to targeted support from Business Gateway Lanarkshire. Facing a tight
deadline, the founders received expert guidance on procurement and sustainability,
enabling them to submit a successful bid. 
4.4. Quality Assurance
4.4.1. The quality of the Business Gateway service delivery in each local authority area is
monitored by Business Gateway nationally via an independent research organisation
which surveys clients that have interacted with the service. Seeking feedback in
respect of the level of satisfaction related to six criteria, as follows:- 
 general satisfaction with the Business Gateway service
 were expectations met/exceeded
 was the service provided of benefit to the business
 would they recommend the Business Gateway service to others
 would they continue using the Business Gateway service
 satisfaction with staff 
4.4.2. Based on the client feedback, a score is generated based on the number of very
satisfied/satisfied responses received and compared against the national target of an
80% positive response in each measured area.  
106

Page 107

4.4.3. Year to Date Performance – Target 80% for all criteria 
Service Criteria 2024-25 
SLC NLC
Satisfaction with Business Gateway 81% 83%
Expectations Met/Exceeded 77% 81%
Beneficial to Business 75% 81%
Likelihood to Recommend 82% 84%
Likelihood to Keep Using 85% 86%
Satisfaction with Staff 89% 93% 
4.4.4. Both South and North Lanarkshire based customers have received strong and
consistent performance across all service areas, with high satisfaction levels, growing
client loyalty, and excellent staff interactions. South Lanarkshire maintained high
satisfaction and recommendation rates throughout. These results reflect a clear
commitment to the delivery of valuable, reliable, and people-focused business support
service. 
4.5. Workshops/Events
4.5.1. The provision of on-line webinars is a major feature of the support that is delivered by
Business Gateway at a national level. These webinars address a wide range of
business topics with quality content which is professionally delivered. As such, the
decision was taken that Business Gateway Lanarkshire should not duplicate what was
on offer nationally but seek to complement it by providing different topics and running
a number of in person events to give clients the opportunity to network. 
4.5.2. Workshops and attendance during 2024/2025: 
Service Total SLC NLC
Local Workshops 21  
Attended 218 111 107
National Workshops  435  
Attended 1,686 787 899 
4.5.3. The priority was to fully utilise the nationally available webinar programme which has
seen 1,686 Lanarkshire clients attend a range of 435 workshops with almost a 50/50
split of those based in South and North Lanarkshire areas respectively attending. 
4.5.4. In respect of the local workshops, Business Gateway Lanarkshire created a new
format - half day bootcamp which has generated significant interest and resulted in
waiting lists for many of the dates advertised. The rate of attendance continues to be
high, with very positive feedback received from participants. 
4.5.5. The bootcamps run monthly and change location to different communities to reach a
wider customer base.  Locations covered in:- 
 South Lanarkshire; Cambuslang, Rutherglen, East Kilbride, Hamilton and
Douglas 
 North Lanarkshire; Motherwell, Wishaw, Newmains, Coatbridge and
Cumbernauld  
107

Page 108

4.5.6. The focus going forward will be to target areas where Business Gateway Lanarkshire
are not seeing enquiries and businesses starting up. 
4.6. Community Engagement
4.6.1. The Business Gateway Lanarkshire team supported over 120 events across
Lanarkshire during 2024/2025.  This allowed the profile of the service to be raised and
networking with potential customers.  Events include, monthly Federation of Small
Business and Lanarkshire Business Hub networking, Redundancy meetings with
PACE, Educational events in schools and colleges – Shark Reef (South Lanarkshire)
and Dragons Lair (North Lanarkshire), mini workshops (including at South Lanarkshire
College) for those studying subjects that lean towards self-employment – Hair and
beauty and photography, Police College retirement sessions, Meet the buyer through
Supplier Development Programme and Local authority events linked to the Real living
wage, Employee Charter and Minority Ethnic engagement. 
4.6.2. Similar engagement activities are ongoing on a weekly basis to make introductions
and set up referral pathways with the wider eco-system partners and to date
engagement has included Scotland Food and Drink, Healthy Working Lives, Royal
Bank of Scotland, Kings Trust, SALUS, UK Steel Enterprise, DSL and many more. 
4.7. Marketing
4.7.1. 2024/2025 was a period of transition for Business Gateway Lanarkshire, with their
marketing activity evolving to keep pace with operational changes and shifting service
priorities. Despite challenges, they continued to raise awareness of their support,
connect with communities, and lay the foundations for a more strategic approach going
forward in 2025/2026. 
4.7.2. The reinstatement of email marketing in December 2024 enabled the launch of
targeted campaigns, with the January Business Start-Up Bootcamp promotion
generating the highest monthly enquiry volume of the year. This demonstrated the
effectiveness of direct digital engagement.   
4.7.3. In addition, new digital marketing campaigns were delivered in partnership with The
Media Shop and Business Gateway National, including Pay Per Click (PPC) and Meta
lead generation ads in November 2024 and April 2025. These campaigns have
successfully attracted new clients to the service and contributed to business starts.
Business Gateway Lanarkshire continue to analyse the leads generated from these
campaigns to understand their outcomes and inform future activity. Going forward,
Business Gateway Lanarkshire will identify geographic and demographic gaps in
engagement and deploy strategic marketing interventions to address these. 
4.7.4. The Start-Up Bootcamps are promoted through a multi-channel marketing approach
aimed at both pre-start individuals and new, early-stage business owners. Activity
includes targeted social media activity (both organic and paid), email marketing, and
engaging video content featuring Business Advisers. The service also collaborates
with local partners such as libraries, colleges, and business networks to extend their
reach. Promotion is supported by traditional marketing such as community outreach.
Participant video feedback is used to build credibility and encourage future
engagement.  
108

Page 109

4.7.5. Looking ahead, the marketing and PR strategy will be refined to align more closely
with key sectors and service objectives. Focus will be placed on increasing
engagement among young people and ethnic minority communities, supported by
partnership working with local colleges, youth forums, and employability services.
Collaborative efforts with organisations such as Routes to Work South and supported
employability programmes will continue to reduce barriers to self-employment for
underrepresented groups. Business Gateway Lanarkshire will also liaise with the
Business Support Teams of South and North Lanarkshire Councils to ensure that
marketing activity is coordinated and maximises its potential reach. 
4.7.6. A key element of the refined strategy will be the use of case studies to showcase the
impact of Business Gateway support across priority sectors. Recent examples
include:- 
 T.R Aitchison Ltd: Family-owned electrician business in South Lanarkshire has
been modernised and won eight contracts after the new owners accessed
specialist advice.
 Televisual Services: A South Lanarkshire televisual services company has
secured tenders with three local housing associations. 
4.7.7. These case studies have been featured in national and local media, including The
Scotsman, Scottish Financial News, Business Money, and the Daily Record. 
4.7.8. The marketing activity undertaken in 2024/2025 laid a strong foundation for a more
strategic and data-informed approach. By aligning outreach with sector priorities,
leveraging partnerships, and enhancing both internal and external visibility, Business
Gateway Lanarkshire is well-positioned to support a broader range of businesses and
individuals in the year ahead. 
5. 2025/2026 Activity 
5.1. Since March 2024, Business Gateway Lanarkshire staff have been through a
considerable period of change with the move into local authority employment and the
introduction of the new delivery strategy. Understandably, this, along with the other
factors outlined previously has contributed to the underperformance in some areas of
the Service.  It is worth noting, however, that some new project outputs were not
measured including increased adviser time spent on community engagement and
additional bespoke support provided to town centre customers in Hamilton,
Cumbernauld and Coatbridge. 
5.2. A key reason for bringing the Business Gateway service in-house was to develop
closer links with other Council services that provide business facing services.  Work
will commence on liaising with other Council services including Environmental Health,
Trading Standards, Non-Domestic Rates, Planning, Routes to Work (South),
Licensing, Procurement and Employability Services. Introductory presentations will be
the first step in building this relationship.  
109

Page 110

5.3. As the Performance Measurement Framework is substantially different from what has
gone before, a revised set of performance targets is proposed for 2025/2026. These
have been developed to reflect the key learnings from the first year of service delivery
and deliver on the requirements of both local authorities. These new targets are:  
BG Category Previous
Annual Target
Recommended
Revised Target
SLC
Target
25/26
Pre-Start Clients Supported 2,000 2,000 1,000
New Business Starts Supported 750 650 325
New Business + Starts Supported
(High Growth Start Ups) 150 65 to 100 (range) 32 to 50
Existing Business Supported 1,000 1,000 500
Local Priority 150 100 50
Business Growth Clients Supported 150 150 75
Business Base Clients Supported 700 750 375 
5.4. The main reductions are in business starts and high growth business starts. These
reflect the current business/economic uncertainty and the fact that people are more
reluctant to either start a business or to grow their business by employing staff, this is
especially impactful on ability of start-ups to achieve high growth status.   
5.5. Local priority support for existing businesses has been reduced but the overall number
of interventions for existing businesses has remained the same, this is to allow more
support of the main business base at this difficult time. 
5.6. The quality-of-service delivery will continue to be measured by an independent third
party. The target will continue at 80% across the four key quality areas: Overall
Satisfaction, Expectations Met, Business Benefits, and Recommend Service. 
6. Employee Implications
6.1. There are no direct employee implications as result of the contents of this report.
Business Gateway Lanarkshire is hosted by North Lanarkshire Council with the
Council’s Business Support Team providing management support.   
7. Financial Implications
7.1. This update sets out the work being delivered within existing business support budgets
and does not have any financial implications for South Lanarkshire Council. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no direct climate change implications as a result of this report.  The work of
Business Gateway Lanarkshire however can assist businesses on their journey to net
zero.   
9. Other Implications
9.1. As Business Gateway Lanarkshire will be the main conduit to the SME business base
in Lanarkshire, they will play a pivotal role in engaging with this business cohort in
relation to our Marmot Place programme during its developmental and delivery
phases.  
110

Page 111

10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Alison Brown, Head of Enterprise and Sustainable Development
Tel: 454700
E-mail: alison.brown@southlanarkshire.gov.uk 
111

Page 112

112

Page 113

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund -
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to advise of grant applications to the Renewable Energy
Fund (REF) for:-
[purpose]
 Hope Hub SCIO (Scottish Charitable Incorporated Organisation)
 Wiston Lodge
 [1purp]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a grant be awarded to Hope Hub SCIO of up to £58,651.94 from the
Renewable Energy Fund to install solar panels and battery storage; and
(2) that a grant be awarded to Wiston Lodge of up to £150,000 from the Renewable
Energy Fund to support revenue costs.
recs]
3. Background
3.1. Since 2004, the Council has collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing the contributions from windfarm developers, advising
potential applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities. 
3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority. All grants awarded are reported annually to the Community and
Enterprise Resources Committee. 
3.3. Several changes were made to the REF criteria at the Community and Enterprise
Resources Committee of 6 February 2024 including supporting revenue funding,
increases to intervention levels and aiming to deliver larger more strategically
impactful projects. 
9
113

Page 114

4. Grant Recommendation
4.1. Application Number 1379 
Hope Hub SCIO – project value £97,753.24. 
Proposed Grant award £58,651.94 intervention rate of 60%. 
The proposed grant of £58,651.94 will be funded from Kype Muir Windfarm which
contributes into the Renewable Energy Fund. 
4.2. Hope Hub SCIO (HHS) is a community group with its purpose being:- 
To manage the community facilities and actively encourage statutory and third
sector organisations and members of the community to use these facilities. 
4.3. HHS has a seven-member management committee, 30 regular volunteers and 100
members. The Hope Hub is an integral part of the Blackwood and Kirkmuirhill
community.  The buildings provide space for community services not currently
available within the area and looks to augment existing facilities and services. The
Hope Hub provides a meeting point for the local community, providing multipurpose
meeting rooms allowing organisations, community groups, local services and
individuals a space to meet. These facilities are supported by a café with a fully fitted
commercial style kitchen, as well as toilets and storage. The experience is further
enhanced by the community garden providing a space of quiet and relaxation. The
facility addresses not just the needs of the local area but the wider Clydesdale area.   
4.4. The grant will allow HHS to instal solar panels and batteries to the building to enable
the group to generate and use its own electricity which will cut carbon emissions and
reduce the costs making it more sustainable in the future. The project has been
designed to provide HHS with their full amount of electricity, and the batteries have
been sized to maximise the use to enable the group to draw almost all their electricity
at off-peak times even in the dullest winter day. 
4.5. The project requires capital funding to instal solar panels and batteries as well as
associated costs for a SPEN connection fee, building warrant, and professional fees. 
The project has been tendered, and best value has been obtained by the group. 
4.6. The project links with the community action plan and delivers on the need to move to
green energy, reducing carbon emission, while making the hall more sustainable by
reducing running costs 
4.7. The application has been assessed and scored an average of 35 out of 53 supporting
a grant award of up to £58,651.94 totalling 60% of eligible costs. 
4.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:  
Funder Stage Value
Community Led local Development
Fund
To be confirmed £39,101.30
SLC Renewable Energy Fund Grant
(60%) Kype Muir. 
For approval £58,651.94
Total project value   £97,573.24    
114

Page 115

4.9. The project is scheduled to commence in October 2025 and be complete by February
2026. Officers will work with the applicant to monitor progress and any impact on the
timescales and allow officers to confirm Community Led local Development Fund has
been secured. 
5. Grant Recommendation
5.1. Application Number 1394 
Wiston Lodge – project value £190,000   
Proposed Grant award £150,000 intervention rate of 79% 
The proposed grant of £150,000 will be funded from Middle Muir Windfarm which
contributes to the REF.  
5.2. Wiston Lodge (WL) is a charity with its purpose being:- 
Wiston Lodge has long served as a sanctuary for people and nature. The estate’s
woodlands and buildings have played host to thousands of children, young people,
community groups, and organisations over the decades. In recent years, there has
been a growing recognition of the importance of connecting with nature, preserving
heritage, and creating resilient communities. 
5.3. WL management committee has six members, 60 regular volunteers, nine full-time
staff and 15 part-time staff. 
5.4. The grant will allow WL to safeguard the future of Wiston Lodge 50-acre site, historic
main lodge building including meeting rooms, residential accommodation,
outbuildings, and modern classroom facilities, mature mixed woodland with a variety
of semi-natural habitats, supporting a diverse range of plant, animal and fungal
communities. 
5.5. WL provides a rural outdoor education centre supporting vulnerable children, young
people, and adults serving over 2,000 users annually.  The centre promotes inclusion,
wellbeing, and environmental education. Its survival is vital for local jobs, community
resilience, and meeting future statutory obligations under the outdoor education. 
5.6. The project requires revenue funding to ensure operational continuity, support core
operations, retain skilled staff, maintain essential infrastructure and build
organisational resilience. Within the funding package an Organisational Land and
Buildings Feasibility will create a plan linked to attracting additional income streams
and a marketing strategy.  This element of the project will be funded through
Community Led Local Development Fund. 
5.7. The project has been established with support from Council officers to ensure the long-
term sustainability of Wiston Lodge.   
5.8. The application has been assessed and scored an average of 35 out of 53 supporting
a grant award of up to £150,000 totalling 79% of eligible costs. 
115

Page 116

5.9. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:  
Funder Stage Value
Community Led Local Development Fund To be confirmed £40,000
SLC Renewable Energy Fund Grant (79%)
Middle Muir
For approval £150,000
Total project value   £190,000 
5.10. The award will support revenue costs from October 2025 to May 2026. Officers will
work with the applicant to monitor progress and any impact on the timescales and
allow officers to confirm Community Led Local Development Funds have been
secured. 
6. Employee Implications
6.1. There are no employee implications arising from this report. 
7. Financial Implications
7.1. The awards will come from the Kype Muir and Middle Muir Windfarms which contribute
to the REF. The Funds have sufficient resources to meet the proposed grant awards
commitment detailed in this report. 
7.2. REF funding awards are subject to all other funding being secured.   
8. Climate Change, Sustainability and Environmental Implications
8.1. HHS solar panels and battery storage will reduce demand for non-renewable energy
sources and make the building more sustainable.  The award to WL will support
ongoing activity in woodland management and biodiversity.   
9. Other Implications
9.1. The risks associated with the project are focused on the potential for cost overruns,
delays to the projects or match funding not being secured. Work will continue with the
applicants to ensure match funding is secured and that projects are delivered broadly
on time and within budget. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
10.2. Community consultation is a requirement for all REF grants.  Consultation can be
referenced through community action plans, independent consultation and social
media platforms.   
David Booth 
Executive Director (Community and Enterprise Resources) 
17 September 2025  
116

Page 117

Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee 6 Feb 2024 Renewable Energy Fund -
Strengthening Links to Rural Priorities. 
List of Background Papers
 Completed REF Appraisal Scoring Sheet for application number 1379
 Completed REF Grant Application Form for application number 1379
 Completed REF Appraisal Scoring Sheet for application number 1394
 Completed REF Grant Application Form for application number 1394 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Colin McFarlane, Project Development Officer
Enterprise and Sustainable Development Services
E-mail: -  colin.mcfarlane@southlanarkshire.gov.uk 
117

Page 118

118

Page 119

Report
Agenda Item 
To: Community and Enterprise Resources Committee
Date: 7 October 2025
Prepared by: Executive Director (Community and Enterprise
Resources)  
Subject: Chatelherault and Calderglen Country Park
Masterplans and Associated Phase 1 Projects 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 update Committee on the work undertaken to develop masterplans for both
Chatelherault and Calderglen Country Parks and seek approval on the strategic
approach for development and investment over the next ten years 
2. Summary of Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) to note that a series of investment proposals have been identified to deliver
beneficial and impactful improvements to each park for which external funding
opportunities will be sought;
(2) that the strategic approach for development and investment in Chatelherault and
Calderglen Country Parks over the next ten years be approved; and
(3)  to note that plans are underway to develop and deliver the identified Phase 1
projects.
3. Background
3.1. In March 2024, following a competitive procurement exercise, Enterprise and
Sustainable Development Services appointed Turner and Townsend Project
Management (TTPM) to assemble and lead a multidisciplinary design team to
undertake a masterplanning exercise for Chatelherault and Calderglen Country Parks. 
The multidisciplinary design team comprises Landscape Architect, Architects, Civil
and Structural Engineers, Transport Consultant, Planning Consultant, Forestry
Consultant, Property Agent and Cost Consultant.   
3.2.    In consultation with the Council and South Lanarkshire Leisure and Culture (SLLC),
the design team were asked to develop a suite of bespoke strategic documents and
supporting intelligence, including Masterplans and Green Book Business Cases, for
both Chatelherault and Calderglen setting out the context for development and
investment over the next 10 years. Each Masterplan reflects the shared aspiration to
maintain Chatelherault and Calderglen as regional destinations offering vibrant and
welcoming facilities which are linked to, and contribute towards, the regeneration of
surrounding communities.   
3.3. The consultancy work was fully funded by the UK Shared Prosperity Fund. 
10
119

Page 120

3.4.  Complementary to the masterplanning exercise, Forestry Management Plans are also
being updated for each park to ensure effective planning, management, and
enhancements to maintain ecological, historical, and user-experience value. The
management plans will help protect historic features, sensitive habitats and special
landscapes for the enjoyment of visitors. 
4. Consultation and Engagement 
4.1. TTPM facilitated a wide range of workshops attended by colleagues from across the
Council and SLLC on topics including but not limited to heritage, woodland
management, branding, commercial opportunities, risk, location and access. The
Council facilitated broad stakeholder engagement including targeted briefings and
discussions with elected members, SLLC Board, Historic Environment Scotland, local
residents and sports clubs. 
4.2. Public consultation events were carried out within both parks during August and
September 2024. This included an online survey which received over 1,000 responses
from members of the public. The intelligence gathered from this wide-ranging
consultation and stakeholder engagement, together with specialist input from the
multidisciplinary design team, has informed the development of investment proposals
for each country park (as detailed within Section 5). 
4.3. Follow-up public engagement sessions to share these draft proposals were held late
August/early September 2025 within each park. A consultation website was also
available with links to an online survey. 
5. Short List of Investment Proposals
5.1. The Masterplans, Outline Business Cases and supporting documents have been
informed by the short list of investment proposals, as detailed below. 
5.2. Chatelherault Country Park 
Chatelherault Investment Proposals 
Architectural Interventions
Visitor Experience 
Enhanced visitor centre including re-configuration of
arrival space and transformation of the café,
exhibition and conference area with new roof-top
orangery 
Heritage  Repairs and upgrades to Grade A Listed Hunting
Lodge 
Landscape Interventions
Access 
Enhance paths/landscape surrounding visitor centre
and central facilities 
Play 
Expansion and upgrade of the existing adventure
playground 
Parking 
Existing overflow car park formalised including
integrated drainage and electric car charging
infrastructure 
120

Page 121

Infrastructure and Servicing
Events Infrastructure
Power/ water/Wi-Fi infrastructure distributed around
the park for events. Infrastructure works include the
addition of a new gatehouse building to service the
play park and events, including sanitary facilities,
community room and shop
Paths Infrastructure  Reinstating the White Bridge 
5.3.    Calderglen Country Park 
Calderglen Investment Proposals 
Architectural Interventions
Visitor Experience  New Gateway Centre and walled garden
transformation with arrival plaza 
Heritage  Historic Courtyard buildings transformation 
Conservation  New conservation and Animal Rehabilitation Centre 
Landscape Interventions
Active Travel  New active travel route into park including a
pedestrian bridge from Colonsay Field 
Access  Enhanced roads/wayfinding/lighting including partial
surfacing of Colonsay Field 
Play  Enhanced play opportunities with a new pump track
near existing adventure play area 
Infrastructure and Servicing
Infrastructure  Power/water/ Wi-Fi infrastructure distributed around
the park for events and new EV Charging points 
5.4. The delivery of these investment proposals is contingent upon the availability of
funding. The Council will use the proposals to actively explore and pursue external
funding options as they become available. 
5.5. As the proposals are implemented, it is anticipated that the overall sustainability of
each park will improve supporting ongoing investment in other aspects over time. For
example, improvements may include:-
 Signage Strategy - site-wide replacement of signs and addition of new signs
particularly at key points. This may include integrated lighting, braille, mapping
information and QR codes to link to a website
 Arts Strategy - public sculpture could be located at key gateways
 Repairs to Trails - around 40% of the trail network in Calderglen and 30% in
Chatelherault, including stepped areas, could benefit from improvement
 Enhancing Biodiversity - there is scope for a management plan for wildflower
meadow reinstatement  
121

Page 122

6.   Phase 1 Projects  
6.1. The Council’s approved budget for 2025/2026 includes an allocation of £1.350m
towards the delivery of the Country Parks Masterplan Phase 1 projects detailed
below:- 
 Country Parks Masterplan feasibility (£0.250m)
 Chatelherault Country Park:  The White Bridge (£0.800m).  In addition, Facilities,
Waste and Grounds have a budget of £0.200m giving a total project cost of £1m.
 Calderglen Country Park:  Bike Pump Track (£0.300m) 
6.2. To secure continuation of service in relation to the Masterplan exercise, the Council
has appointed TTPM to lead and manage the delivery of these Phase 1 projects
through RIBA stages 3-7. Work includes: - 
 all aspects of design and delivery including all preliminary works
 all site surveys and investigations
 statutory consents
 all aspects of design
 preparation of pre-tender documents and drawings as required for the project
 the procurement of the construction contract via the Councils Procurement Team
 management of the contract thereafter through to completion and handover 
6.3. Subject to procurement and statutory approval it is anticipated that works to construct
the Pump Track will commence on site early in 2026. 
6.4.  The White Bridge project is still in the early stages of development with project scope,
cost and viability still to be determined. The current indicative programme has works
estimated to start on site late Spring 2026. 
7. Employee Implications
7.1. The project has been supported by officers in Enterprise and Sustainable
Development (ESD), with input from colleagues across the Resource and within SLLC. 
7.2. Delivery of the Phase 1 projects is also being supported by ESD employees.   
8. Financial Implications
8.1. The Council’s approved budget for 2025/2026 includes an allocation of £1.350m for
the delivery of the initial projects at Chatelherault and Calderglen Country Parks.   
8.2. The completed masterplans and supporting intelligence will be used to pursue
significant external investment in Council assets and support external funding bids to
a range of sources including UK Government, Scottish Government, Heritage Lottery
Fund etc.   
9. Climate Change, Sustainability and Environmental Implications
9.1. The proposed projects will contribute towards the Council’s Sustainable Development
and Climate Change Strategy with project builds / refurbishment having a strong net
zero focus.  
122

Page 123

10. Other Implications
10.1 The masterplans set the vision for investment in the country parks over the next 10
years.  The investment required is significant and will be reliant on the Council securing
external funding.  
11. Integrated Impact Assessment and Consultation Requirements
11.1. Integrated Impact Assessments have been undertaken for each masterplan and are
available to view on the Council website. 
11.2. Consultation has been ongoing throughout the development of the Masterplans
including two rounds of public engagement within each park, in Summer 2024 and
Summer 2025. As investment proposals are further developed, additional consultation
including the establishment of a stakeholder group will be undertaken.   It is also
proposed that the masterplans be presented to the Hamilton and East Kilbride Area
Committee is the coming months.   
David Booth  
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs 
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 We will work towards a sustainable future in sustainable places
 People live the healthiest lives possible
 Caring, connected, sustainable communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like further information, please contact
Pauline Crisp, Team Leader  
Enterprise and Sustainable Development Services 
pauline.crisp@southlanarkshire.gov.uk 
123

Page 124

124

Page 125

Executive Summary
Chatelherault
Country Park
Masterplan
10
125

Page 126

Background
In March 2024, following a
competitive procurement exercise,
Enterprise and Sustainable
Development Services (ESDS)
appointed Turner and Townsend
Project Management (TTPM)
to assemble and lead a multi-
disciplinary design team to
undertake a master planning
exercise for Chatelherault and
Calderglen Country Parks.
In consultation with the Council and
South Lanarkshire Leisure and Culture
(SLLC) the design team were asked to
develop a suite of bespoke strategic
documents and supporting intelligence,
including Masterplans and Green Book
Business Cases, for both Chatelherault
and Calderglen setting out the context for
development and investment over the next
10 years.
The consultancy work was fully funded by
the UK Shared Prosperity Fund.
Chatelherault Country
Park Overview
Chatelherault Country Park is one of South
Lanarkshire’s most iconic and historically
significant landscapes. Situated on the edge
of Hamilton, it is a place where centuries of
heritage, natural beauty and community life
converge. From its origins as a grand hunting
estate to its present role as a cherished
public park, Chatelherault has long been
a space for connection — between people,
nature and history. Chatelherault attracts
around 800,000 visitors annually with
a large existing population and growing
populations in nearby areas of Hamilton,
Ferniegair, Larkhall and the central belt.
To preserve the park for current and future
generations, significant investment is
required to enhance the park’s infrastructure
and facilities and protect its outstanding
landscape and heritage. Doing so will secure
Chatelherault’s future as an effective and
sustainable country park. Chatelherault
can be a national exemplar of how historic
landscapes can be sensitively adapted to
meet contemporary needs. It will serve as
a cornerstone of South Lanarkshire’s green
infrastructure network, supporting the
Council’s wider ambitions for climate action,
community wealth building, and cultural
regeneration. Transformation is sought that
is not only physical, but social, environmental,
and economic. The Masterplan’s proposals
are designed to deliver long-term public
benefit. This transformation will:
Restore and enhance Chatelherault
Country Park’s outstanding historic
buildings, gardens and grounds as a
sustainable place for local people and
visitors to connect with each other, to
learn and discover. 
Provide enhanced opportunities to
connect with nature and to be active
and relax, all while celebrating South
Lanarkshire’s cultural heritage.
Protect Chatelherault’s role as a landscape
museum, offering shelter and protection
for culturally significant sculptures,
monuments, bridges and buildings.
Chatelherault Country Park  Executive Summary126

Page 127

Support inclusive access to nature and
culture, ensuring that people of all ages,
backgrounds, and abilities can enjoy the
park’s amenities.
Promote environmental stewardship.
Strengthen community identity and
cohesion, by creating spaces for gathering,
learning, and celebration.
Stimulate local economic activity, through
tourism, events, education, and ethical
commercial partnerships.
Unlock new revenue streams and reduce
long-term maintenance costs.
Consultation and Engagement
The development of the Masterplan
has focussed on capturing,
maintaining, and protecting all that
makes Chatelherault valuable and
has been informed by extensive
engagement and consultation with
key stakeholders during Summer
2024 and Summer 2025, including:
South Lanarkshire’s residents and visitors
Park users 
Elected members
Statutory bodies (Planning/Roads)
Historic Environment Scotland
Key observations from this
engagement include:
There is widespread support for improving
Chatelherault Country Park as it is
considered a valued community and
nationally important asset.
Free entry to the grounds and free parking
are widely supported.
The introduction of more optional paid
activities is supported to help long term
sustainability.
Preserving and enhancing the Grade A
listed Hunting Lodge and enhancing the
1980s extensions to improve the visitor
centre and events offer should be a
priority.
The Hunting Lodge is a popular wedding
venue but is very restricted in its offer
due to limited reception facilities and the
conference, exhibition and museum offer
is dated.
The current café facilities are popular but
could be significantly enhanced.
Access to the café, retail and toilets does
not feel fully inclusive and is remote from
the play areas.
Dogs are not allowed in the café in a
location where dog walking is very popular.
Provision of a drinks and snacks kiosk
with toilets near the play area would be
welcome.
The gradens, and courtyard spaces could
be much more accessible and enhance the
visitor and café experience.
The adventure play area is tired and the
location, surrounding by roads, is not ideal.
The park lacks infrastructure to support
events. 
There is support for prioritising
improvements that can be delivered in the
short term.
The closed White Bridge at Chatelherault
disrupts key walking loops. 
There are very few places to shelter in 
the rain.
Vandalism remains a concern and does
require active prevention measures.
Chatelherault Country Park  Executive Summary127

Page 128

Constraints and
Opportunities
The extensive consultation and engagement
undertaken has identified both constraints
and opportunities relating to access,
safety and visitor experience offered at
Chatelherault. Specifically: 
The main car park accesses the back
entrance of the historic building which 
is confusing. 
The White Bridge is not open which
prevents access to trails in the south.
Play park surrounded by car parking. 
Entrance to visitor centre at the back of
the building. 
Wayfinding and signage could be updated
as some of it is in poor condition and is a
mix of different types and styles. 
Steps down to the Grand Avenue from 
the Lodge are steep and narrow. 
No pedestrian path along road in
front of Lodge.
Vision and Strategic
Objectives
A new vision for Chatelherault Country
Park has been informed by community and
stakeholder engagement, environmental
goals, the park's unique character and
heritage, legal and policy requirements, and
a holistic understanding of sustainability,
encompassing social, environmental, and
economic factors. Consideration of factors
including accessibility, safety, and funding
will ensure the vision can be successfully
implemented and sustained over time.
Vision
To restore and enhance Chatelherault
Country Park’s outstanding historic buildings,
gardens and grounds as a sustainable place
for local people and visitors to connect with
each other, to learn and discover, to connect
with nature and to be active and relax, all
while celebrating South Lanarkshire’s cultural
heritage.
Chatelherault Country Park  Executive Summary128

Page 129

Priority Theme 1: 
Financial Resilience
Strengthen the financial sustainability
of Chatelherault by maximising income
generation and commercial, and external
funding opportunities.
Objectives
1. Explore, develop and secure external
funding that can be invested in
Chatelherault to sustain it for future
generations.
2.  Maximise opportunities to generate
income at Chatelherault through catering,
events and innovative paid for facilities
and services.
3.  Increase commercial and sponsorship
activities which enhance the park and
visitor experience.
4.  Secure funding through Section 75 
planning obligations/developer
contributions.
Priority Theme 2: 
Health and Wellbeing
Chatelherault supports health and wellbeing,
contributes to social inclusion and enhances
quality of life for people of all ages and
abilities.
Objectives
1. Ensure good connectivity and physical
access and improved paths and bridges
network within the park for residents
to enjoy.
2.  Enhance visitor facilities and events
infrastructure to provide a welcoming,
attractive and enjoyable place which
encourages increased or repeat visits
for formal and informal leisure and
recreation activities that improve health
and wellbeing and facilitate community
connections.
3.  Maximise opportunities for activities which
support physical and mental health and
wellbeing.
Priority Theme 3: 
Heritage Assets
Manage, preserve and enhance
Chatelherault’s outstanding historic buildings
and cultural heritage while contributing to
South Lanarkshire’s economic and net zero
targets.
Objectives
1.  Restore the Hunting Lodge, and
associated buildings, for sustainable and
resilient uses which secures the long term
viable future of the site and aspire to be
carbon neutral.
2.  Preserve and enhance Chatelherault’s
courtyard, historic gardens, trees and
views to provide diverse creative spaces for
events and activities.
3.  Identify and manage pressure points
of high usage to ensure Chatelherault
heritage sites continue to be protected for
future generations.
4. Manage historic buildings so there are
opportunities to connect communities to
the value of heritage and conservation.
Priority Theme 4: 
Woodlands, Landscape and
Vistas
Manage, preserve and enhance
Chatelherault’s unique woodlands,
landscape, viewpoints and path network
while contributing to South Lanarkshire’s
commitments to net zero.
Objectives
1.  Protect and enhance green/blue assets
and infrastructure, in particular historic
features, sensitive habitats and special
landscapes.
2.  Identify and manage pressure points of
high usage to ensure Chatelherault’s unique
landscape continues to be accessible to
visitors for generation to come.
3.  Manage our woodlands, landscape and
vistas to enhance opportunities to connect
communities to the value of heritage and
conservation.
Chatelherault Country Park  Executive Summary129

Page 130

Priority Investments
Approach
Following the development of the
Vision as well as detailed analysis and
consultation on the park, it was clear
that whilst the main assets are the open
space and landscape, the areas requiring
the most significant investment are the
buildings and spaces immediately around
them which deliver the arrival, core visitor
experience and enable the wider park to
remain sustainable for all to enjoy. The
Priority Investments detailed below can
be delivered independently, however,
consideration of them collectively delivers
a cohesive approach.
Architectural Interventions 
CH1 Visitor Experience: 
Enhanced visitor centre including the
re-configuration of arrival space and
new rooftop Orangerie. 
CH2 Heritage: Historic Lodge Building
repair and upgrade.
Landscape Interventions
CH3 Access: Enhanced paths/
landscape surrounding visitor centre
and central facilities.
CH4 Play: Expansion and upgrade of
the existing adventure playground.
CH5 Parking: Existing overflow car
park formalised including integrated
drainage and electric car charging
infrastructure.
Infrastructure and Servicing 
CH6 Events Infrastructure:
Power/water/WiFi Infrastructure
distributed around the park for
events. Infrastructure works include
the additional of a new gatehouse
building to service the play park and
events, including sanitary facilities,
community room and shop.
CH7 Paths Infrastructure: 
Reinstating the White Bridge.
CH1 Visitor Experience: 
Enhanced visitor centre
including the re-configuration
of arrival space and new rooftop
Orangerie
Scope
The existing visitor centre comprises a mix of
single storey spaces created in the 1980s by
converting the stables and walled garden.
The café, retail, exhibition, museum and
conference spaces are dated and dark.
Alongside this there is a roof terrace which
can be seen but not accessed. This project
reconfigures the café, retail, exhibition and
conference space to make it a contemporary
flexible events space. The spaces are flooded
with light by incorporating rooflights in
the café area and introducing a rooftop
Orangerie allowing light to the space below
and access to the roof terrace. The access
points are changed to create a free flow
between inside and outside. The proposals
transform the core functions and the support
functions including toilets. This will allow
larger weddings and events like conferences
to run alongside day-to-day visitor
experiences.
Sustainability
Proposals will include reuse of existing
structures whilst enhancing the performance
of fabric and building services. They will
transform the visitor experience and
revenue generating opportunities along with
enhancing accessibility.
Benefits
Enhanced visitor and events experiences.
Increased income generation.
Enhanced energy efficiency.
Chatelherault Country Park  Executive Summary130

Page 131

CH2 Heritage: 
Historic Lodge Building repair
and upgrade
Scope
The Hunting Lodges are stunning examples
of unique Scottish Architecture. They lay
derelict for many years until they were
renovated in the 1980s. At that time all that
remained were the stone walls. All other
aspects were new to be sympathetic to the
original including windows, doors, render,
slate, gates, plasterwork and floors. There
were new services including a concealed
heating system in the 1980s. The project
is to sensitively upgrade the fabric and
services to enhance energy performance. The
primary space is the banqueting hall. Other
areas are less prominent in the events and
conference offer but can add to the visitor
experience and all have stunning views over
the landscape.
Sustainability
Proposals will enhance a nationally important
historic building. They will improve energy
efficiency and accessibility and protect the
building for future generations.
Benefits
Protection of a nationally important
heritage asset.
Enhanced visitor and events experiences.
Enhanced energy efficiency.
Improved accessibility.
Chatelherault Country Park  Executive Summary131

Page 132

CH3 Access: 
Enhanced paths/landscape
surrounding visitor centre and
central facilities
Scope
The paths and landscape immediately
around the Hunting Lodge and visitor centre
are in fairly poor repair and not suitable
for those with mobility issues or prams or
young children. These areas are important
as they should be the main approaches to
the Hunting Lodge and visitor experience
including the café and events spaces. They
take visitors up from the end of the main
arrival avenue used by most pedestrians
from the station, from the lower car park
areas and the other main pedestrian
approach from the Town Centre to the north
through the grand landscape in front of
the Hunting Lodge. As a result the primary
access for many to the Hunting Lodge and
visitor centre is from the rear of the building
via a low-quality tarmac ‘shared surface’
from the upper level of the car park also in
poor condition. Improvements will include
surface, lighting, stairs, wayfinding and soft
landscaping upgrades around the main
building to create a more intuitive and
legible arrival sequence with functional break
out rich in biodiversity.
Sustainability
The proposal focuses on upgrading existing
routes and paved areas using sustainable
materials to improve accessibility and the
setting of the nationally important listed
building.
Benefits
Improve accessibility.
Enhance sense of arrival and setting of
nationally important listed building.
Enhance café/exhibition/events access
and spill out.
Chatelherault Country Park  Executive Summary132

Page 133

CH4 Play: 
Expansion and upgrade of the
existing adventure playground
Scope
The existing footprint of the playground will
be expanded in its current location. The play
equipment will be replaced with a series
of high-quality, themed equipment pieces
which work with the woodland and heritage
setting of the park. Surfacing, fencing and
lighting will all be improved making the play
and viewing experience far more attractive
and easier to maintain. Trees surrounding the
playground will be retained and managed
to reduce canopy spread where appropriate,
allowing more light into the space and
reducing leaves. The loop road and parking
bays to the west of the play area will be
removed to allow its expansion. This will
create safe links between the play area and
the visitor centre and café. The parking will
be replaced in the overflow car park as part
of CH5. Access to the Hunting Lodge will be
provided with new footpath connections,
improving legibility of the setting.
Sustainability
The project will work sensitively with existing
topography and landscape features. It will
reduce pollution next to the house and
play area. New surfaces and landscape
amendments will enhance the environmental
quality and biodiversity whilst incorporating
sustainable drainage.
Benefits
Wider range of play opportunities.
Health and wellbeing.
Better links with the café.
Safer and more inclusive.
More appropriate to the heritage setting.
Enhanced biodiversity and drainage.
CH5 Parking: 
Existing overflow car park
formalised including integrated
drainage and electric car
charging infrastructure
Scope
The existing car parking numbers are
generally sufficient for the facilities. There
is good public transport access for events.
Current parking within the trees is well
used, however, it leads visitors to the rear
of the Hunting Lodge rather than the main
frontage. The parking to the west side of the
play area is intrusive. There is an informal
overflow car park to the north. This is more
level and provides a more convenient
approach to the front of the Hunting
Lodge. The proposal is to formalise this to
accommodate more spaces to offset removal
of spaces next to the play area. This will also
improve the space for events such as the very
popular Farmers Market.
Sustainability
This proposal will improve accessibility
and reduce congestion. New surfacing
will allow sustainable drainage, and
associated planting will enhance biodiversity.
Incorporation of EV Charging Spaces will
provide further benefit.
Benefits
Improve accessibility.
Enhance events space.
Reduce congestion and pollution near the
play area.
Improve approach to a nationally
important heritage asset. 
Enhance biodiversity and drainage.
Chatelherault Country Park  Executive Summary133

Page 134

CH6 Events Infrastructure: 
Power/water/WiFi Infrastructure
distributed around the park for
events including the addition
of a new gatehouse building to
service the play park etc
Scope
The large field in front of the Hunting Lodge
is used for events including concerts. The
overflow car park is used for a popular
Farmers Market. The proposal includes the
provision of a new Gatehouse strategically
positioned adjacent the play park, facing
north towards the national cycle route. This
location has been selected for its optimal
convenience, as it sits between the play park,
car park and events space. It will provide
shelter with a roof overhang for park users
during periods of rainfall and hot days, while
the kiosk will offer light refreshments to park
visitors, including parents, children, cyclists,
and dog walkers. Additionally, the Gatehouse
will host a plant room, as a control centre for
new events infrastructure including power,
Wi-Fi, water, sound and lighting It also
includes some hardstanding near the main
event field.
Sustainability
Reduce the impact on the surfaces near the
field which are often damaged during events
and make events easier to host enabling the
programme to be broadened for the benefit
of the community with associated economic
opportunities. A power and water connection
will enable more sustainable provision rather
than generators.
Benefits
Enhanced sense of arrival to heritage
assets.
Community space and passive supervision.
Improve offer for events.
Enhance the blend with the other 
Priority Investments.
Reduce damage to landscape 
during events.
Provide events infrastructure in a more
sustainable way.
Enhanced economic activity and income
generation.
CH7 Paths Infrastructure: 
Reinstating the White Bridge
Scope
The White Bridge was an important
connection approximately halfway along
the main riverside woodland walks in the
park. Over the years it became unsafe and
has been closed for a significant time. This
project involves a replacement for the bridge
and upgrading of the paths and landscape
around it.
Sustainability
The proposal will reopen important walking
routes providing access to nature and
heritage and beneficial to health and
wellbeing. It will reuse existing structures and
paths. It will be a more accessible design,
and materials used for the bridge and the
surrounding landscape will be sustainable,
carefully considering the biodiversity and
wildlife.
Benefits 
Improve access to stunning nature and
heritage.
Improve accessibility.
Reuse of existing structure.
Promote health and wellbeing.
Enhance biodiversity.
Inspired by the historic architecture and
bridges of Chatelherault.
Chatelherault Country Park  Executive Summary134

Page 135

Next Steps
Consultation and
Engagement
Further public engagement sessions were
held in each park during late August/early
September 2025 to share the proposed
strategic approach and present the draft
proposals.
Further stakeholder engagement including
with Elected Members and Area Committees
will be held in the Autumn / Winter of 2025.
Sustainability Impact
Assessment
A Sustainability Impact Assessment (SIA) has
been commissioned and will provide South
Lanarkshire Council with an assessment of
the likely impacts of the design proposals
contained within the Chatelherault Country
Park Masterplan.
Forestry Management Plan
A comprehensive Forestry Management
Plan will be developed, clearly defining
the boundaries of Chatelherault Country
Park and supporting effective planning,
management, and enhancements to
maintain ecological, historical, and 
user-experience value.
Phasing
The Masterplan phasing plan balances
immediate wins, revenue generation,
accessibility improvements, and long-
term infrastructure development,
ensuring a strategic and financially
viable transformation. The early focus on
recreational and conservation assets builds
momentum, while later phases focus on
commercial sustainability, accessibility, and
futureproofing. By sequencing projects in
this way, the park maximises its impact while
ensuring efficient resource allocation and
minimal disruption.
Phase 1: The first phase will focus solely
on the reinstatement of the essential link
the White Bridge creates, with dedicated
funding now in place, the reinstatement of
the White Bridge takes precedence as the
first phase of the Masterplan. Completing
this work in isolation allows for minimal
disruption to future construction phases
while securing a key heritage feature
of the park and offering an immediate
enhancement of the visitor experience.
Future Phases: The Masterplan and
supporting documents will allow for
external funding bids to be prepared for
specific projects. The Priority Investments
are structured to enable each project to
be mobilised to suit funding requirements.
Chatelherault Country Park  Executive Summary135

Page 136

Produced by Communications and Strategy. 068426/Aug25
If you need this information in another language or format, 
please contact us to discuss how we can best meet your needs.
Phone: 0303 123 1015 
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk
136

Page 137

Executive Summary
Calderglen 
Country Park
Masterplan
10
137

Page 138

Background
In March 2024, following a
competitive procurement exercise,
Enterprise and Sustainable
Development Services (ESDS)
appointed Turner and Townsend
Project Management (TTPM)
to assemble and lead a multi-
disciplinary design team to
undertake a master planning
exercise for Chatelherault and
Calderglen Country Parks.
In consultation with the Council and
South Lanarkshire Leisure and Culture
(SLLC) the design team were asked to
develop a suite of bespoke strategic
documents and supporting intelligence,
including Masterplans and Green Book
Business Cases, for both Chatelherault
and Calderglen setting out the context for
development and investment over the next
10 years.
The consultancy work was fully funded by
the UK Shared Prosperity Fund.
Calderglen Country
Park Overview
Calderglen Country Park is a regional asset
with the potential to be a national exemplar
of sustainable park development. With nearly
one million visitors annually, the park already
plays a vital role in the health, wellbeing, and
cultural life of South Lanarkshire.
However, its infrastructure, facilities, and
landscape require significant investment to
meet the demands of a growing and diverse
population. The Masterplan presents an
opportunity to reimagine Calderglen as a
dynamic, inclusive, and resilient destination.
It will serve as a cornerstone of South
Lanarkshire’s green infrastructure network,
supporting the Council’s wider ambitions for
climate action, community wealth building,
and cultural regeneration. Transformation
is sought that is not only physical, but
social, environmental, and economic.
The Masterplan’s proposals are designed
to deliver long-term public benefit. This
transformation will:
Reinforce Calderglen as a flagship
destination within South Lanarkshire’s
leisure and culture portfolio,
complementing other key sites such as
Chatelherault Country Park and the
National Museum of Rural Life.
Support inclusive access to nature and
culture, ensuring that people of all ages,
backgrounds, and abilities can enjoy the
park’s amenities.
Promote environmental stewardship,
through biodiversity enhancement,
sustainable drainage, and low-carbon
building design.
Strengthen community identity and
cohesion, by creating spaces for gathering,
learning, and celebration.
Stimulate local economic activity, through
tourism, events, education, and ethical
commercial partnerships.
Calderglen Country Park  Executive Summary138

Page 139

Consultation and Engagement
The development of the Masterplan
has focussed on capturing,
maintaining, and protecting all that
makes Calderglen valuable and
has been informed by extensive
engagement and consultation with
key stakeholders during Summer
2024 and Summer 2025 including:
South Lanarkshire’s residents and visitors
Park users 
Elected members
Calderglen sports clubs
Statutory bodies (Planning/Roads)
Historic Environment Scotland
Calderglen’s onsite residents
Key observations from this
engagement include:
Calderglen Country Park is recognised and
valued as an important community asset. 
Free entry and parking at Calderglen is
widely supported.
The introduction of more optional
paid activities for visitors who want to
participate is supported. 
Rather than significantly increasing visitor
numbers, the focus should be on optimising
the quality and sustainability of offerings.
The park is very popular for families with
the play areas very well used.
The arrival experience to the park could be
significantly improved. 
The Historic Buildings are a key part of the
visitor experience.
The zoo experience is popular, however,
a greater emphasis on conservation,
education, and environmental
sustainability, including improvements in
energy efficiency would be supported.
Calderglen’s sports facilities are an
important component in the park and
access to these requires to be considered.
Calderglen’s onsite residents to be
considered when identifying development
opportunities and investment priorities.
Calderglen Country Park  Executive Summary139

Page 140

Constraints and
Opportunities
The extensive consultation and engagement
undertaken has identified both constraints
and opportunities relating to the arrival,
access and quality of amenities offered at
Calderglen. Specifically: 
The main car park is often full, and the
overflow car park (Colonsay Field) is
unusable in bad weather. 
On sunny days there are traffic issues,
the bridge and main route into the
park is narrow, shared by vehicles and
pedestrians, and is in poor condition. 
Due to tight bends, buses find it difficult
to drive into the park and there are no
dedicated bus stops or drop-off areas. 
While the zoo remains hugely popular,
the building and animal facilities are very
dated and in poor condition. 
The café and exhibition space in the
historic buildings that form the courtyard
area could be significantly improved and
enhance the visitor experience.
Children’s play facilities are a key
attraction and could be further extended
and enhanced. 
A sustainable model is important to
support maintenance and access to the
attractive woodland trails and natural
environment.
Existing sports pitches are well used and
operate under lease agreements.
Access for the golf course and on-site
residents requires to be maintained.
Infrastructure is limited however visitor
demand for, and interest in, events remain
strong.
Key considerations and
opportunities identified during
consultation include: 
There are very few places to shelter in 
the rain.
The café offer is fairly limited.
The toilets and other support facilities are
poor quality.
Congestion, car parking and coach parking
are problematic in the park.
Improved exhibition space would be
considered beneficial.
Sustainable Drainage Systems (SUDs)
could improve surface water management.
Vandalism remains a concern and does
require active prevention measures. 
Evolving the animal care aspect may 
be appropriate.
Calderglen Country Park  Executive Summary140

Page 141

Vision and Strategic
Objectives
A new vision for Calderglen Country Park has
been informed by community engagement,
environmental goals, the park’s unique
character and heritage, legal and policy
requirements, and a holistic understanding
of sustainability, encompassing social,
environmental, and economic factors.
Consideration of factors including
accessibility, safety, and funding will ensure
the vision can be successfully implemented
and sustained over time.
Vision
The vision is to maintain and enhance
Calderglen Country Park as a welcoming,
diverse, vibrant and cost-effective
destination which is recognised and valued
by the people of South Lanarkshire as a
significant community asset. It will remain a
sociable place for play, sport and leisure in an
inspiring natural setting which contributes to
healthier, happier, more connected lives.
Priority Theme 1: 
Financial Resilience
Strengthen the financial sustainability of
Calderglen Country Park by providing income
generation, commercial and external funding
opportunities alongside improved facilities
which are free to access.
Objectives
1.  Provide opportunities to generate income 
at Calderglen through catering, events
and innovative chargeable facilities 
and services.
2.  Increase commercial and sponsorship
activities which enhance the park and the
visitor experience.
3.  Explore, develop and secure external
funding that can be invested in Calderglen
to sustain it for future generations.
4.  Secure funding through Section 75 
planning obligations/developer
contributions.
Priority Theme 2: 
Health and Wellbeing
Calderglen Country Park supports health and
wellbeing, contributes to social inclusion and
enhances quality of life for people of all ages
and abilities.
Objectives
1. Ensure good connectivity and physical
access to Calderglen and improved paths
network within the park for residents 
to enjoy.
2.  Enhance visitor facilities to provide a
welcoming, attractive and enjoyable 
place which encourages increased or
repeat visits.
3.  Maximise opportunities for activities 
which support physical and mental health
and wellbeing.
4.  Provide diverse opportunities for physical
exercise, sport and recreation.
Priority Theme 3: 
Woodlands, Landscape and
Heritage
Manage, preserve and enhance Calderglen’s
unique woodlands, landscape and heritage
assets and contribute to South Lanarkshire’s
commitments to net zero.
Objectives
1.  Protect and enhance green/blue assets
and infrastructure, in particular historic
features, sensitive habitats and special
landscapes.
2.  Preserve and enhance historic built assets
and aspire to be carbon neutral.
3.  Identify and manage pressure points of
high usage to ensure Calderglen heritage
sites continue to be preserved.
4. Manage our woodlands, landscape
and historic built assets so there are
opportunities to connect communities to
the value of heritage and conservation.
Calderglen Country Park  Executive Summary141

Page 142

Priority Investments
Approach
Following the development of the
Vision as well as detailed analysis and
consultation on the park, it was clear
that whilst the main assets are the open
space and landscape, the areas requiring
the most significant investment are the
buildings and spaces immediately around
them which deliver the arrival, core visitor
experience and enable the wider park to
remain sustainable for all to enjoy. The
Priority Investments detailed below can
be delivered independently, however,
consideration of them collectively delivers
a cohesive approach.
Architectural Interventions 
CG1 Visitor Experience: 
New Gateway Centre and Walled
Garden transformation with 
Arrival Plaza 
CG2 Heritage: Historic Courtyard
buildings transformation 
CG3 Conservation: New conservation
and Animal Rehabilitation Centre
Landscape Interventions 
CG4 Active Travel: New active travel
route into park including a pedestrian
bridge from Colonsay Field 
CG5 Access: Enhanced roads/
wayfinding/lighting including partial
surfacing of Colonsay Field 
CG6 Play: New Pump Track near
existing Adventure Play Area
Infrastructure and Servicing 
CG7 Infrastructure: Power/water/WiFi
infrastructure distributed around the
park for events and new EV Charging
Points
CG1 Visitor Experience: 
New Gateway Centre and
Walled Garden transformation
with Arrival Plaza
New Gateway Centre
A key element in the Masterplan is to replace
the Existing Zoo Building constructed in the
1990s with a New Gateway Centre. The New
Gateway Centre will be located in the heart
of the park. This location marks the arrival
point between the active travel route, the
car park and a variety of spaces. A 2-storey
building will replace the 1 storey zoo building.
This allows a first floor café/restaurant with a
generous terrace to have excellent views over
the park including the Adventure Playground,
Walled Garden, New Conservation and
Animal Rehabilitation Centre, Golf Course
and those arriving via the new active travel
route or the upgraded car park.
Walled Garden
The project includes transformation of
the Walled Garden. It will become a
flexible space allowing events and play
or simple recreation and relaxation. The
transformation will make it more permeable
whilst enabling it to be managed for events
while protecting important plants and trees.
Arrival Plaza
The project also includes the arrival plaza
linking through to Torrance House and the
adventure playground with nature trails,
woodland, river and waterfalls beyond.
Car Park
Alongside these elements, the existing main
car park will be upgraded with improved
surfacing, lighting and landscape features.
Calderglen Country Park  Executive Summary142

Page 143

Benefits 
Transforming the arrival experience.
A café/restaurant/social space with
stunning views over the park.
Significant enhancement to landscape for
recreation, play and biodiversity. 
Expanding the opportunities for
community, education, exhibition and
events. 
Providing important infrastructure to
support the wider park including toilets
and changing places facilities accessible 
to all.
Proving much needed space suitable for 
all weather conditions.
Enhancing the setting of a key heritage
asset.
CG2: 
Historic courtyard buildings
transformation
Torrance House
Torrance House is an important and unique
Listed Building and the main house remains
in private residential use. This project involves
the enhancement of the listed courtyard
buildings and listed Rangers Cottage.
Courtyard and Buildings
The proposal is to reuse the existing
structures but repair and upgrade the fabric
and alter the internal layouts to establish a
more effective blend and hierarchy of spaces
that better delivers, exhibition and retail
functions across all weather and all seasons.
This seeks to create better internal seating
and circulation areas, with revised catering
facilities to allow visitors access and use,
particularly beneficial during rainy days.
Calderglen Country Park  Executive Summary143

Page 144

Rangers Cottage
The Rangers Cottage, situated in a key
gateway location, is an ideal opportunity
to serve as an educational hub. It’s rear
garden and greenhouse spaces provide
easy integration with hands-on learning
experiences.
Greenhouse and Garden Space
Integration
The greenhouse and garden areas present
further opportunities for education. Rangers
and gardeners can demonstrate gardening
methods and emphasise the significance of
flora and fauna within the park. Additionally,
the greenhouse could serve as a primary
growing source for the Conservation and
Animal Rehabilitation Centre, allowing
pupils to trace the “seed-to-feed” journey,
thus creating a comprehensive educational
experience.
Benefits 
Enhance the visitor experience including
café, exhibition, events, community,
education and small-scale retail (gift shop)
Reduce running costs and energy
consumption.
Protect important heritage assets.
Provide fully accessible toilets and comfort
facilities
CG3: 
Conservation and Animal
Rehabilitation Centre
Animal Conservation and
Rehabilitation
The proposed Conservation and Animal
Rehabilitation Centre at Calderglen Country
Park will be a flagship facility supporting
wildlife rehabilitation, conservation
education, and community engagement.
Building upon the park’s established zoo, the
new centre aims to provide specialist care
for animals while fostering public awareness
of biodiversity, sustainability, and animal
welfare. The building is smaller than the
current zoo building.
This will allow better environmental control
for the animals, reptiles, fish, insects and
birds and for the visitors. It will make the
facilities more efficient to operate and
maintain to deliver a high-quality experience.
The main building will be single storey and
will lead to an attractive nature garden with
further enclosures and education space.
Calderglen Country Park  Executive Summary144

Page 145

Sustainability
The project will be designed to meet current
sustainability standards, replacing the
inefficient existing zoo. This will include a
fabric first approach with efficient systems
and renewables.
Benefits
Improved facilities for visitors and for
animals.
Enhanced education experience.
Improved energy efficiency and
environmental control.
CG4 Active Travel: 
New active travel route into
park including a pedestrian
bridge from Colonsay Field
Active Travel
A new active travel route from the Colonsay
Field car park to the central park areas for
pedestrians and cyclists. It includes a bridge
over the river, through woodland, along the
avenue of trees between the sports pitches
leading up to the centre of the park and the
other facilities including the New Gateway
Centre, Walled Garden and Adventure Play
Area. It will reinforce the sense of arrival to
the park, make the existing entrance far less
congested and safer, and encourage more
pedestrian and cycle access. This is around
400m or 5 minutes’ walk. Along the active
travel route, lighting and wayfinding will be
included for safety and legibility.
Sustainability
The route has been carefully selected to be
direct whilst being a sensitive location to
form a route through the trees and across
the river working with existing levels for
the bridge and the paths. The specification
will be low maintenance and make the
environment feel more safe and secure.
Benefits
New sense of arrival.
Safer and more sustainable access.
Reduced car use.
Beneficial for events.
Protecting the existing Listed Gatehouse
and Bridge.
CG5 Access: 
Enhanced roads/wayfinding/
lighting including partial
surfacing of Colonsay Field
Parking and Access
Formalising the parking in Colonsay Field
will include surfaces which are suitable for
wheelchair users and buggies, porous parking
bays and swales to provide a natural and
sustainable aesthetic appropriate to the
park. Facilities will include EV charging points.
Lighting and wayfinding are to be sensitively
integrated and will extend from the car park
to the new active travel route.
Sustainability
Colonsay Field is currently used for parking.
This will formalise it in a sensitive and
sustainable way to significantly reduce the
requirement for cars to go into the park and
enable the existing car park in the middle
of the park to be prioritised for families and
those with mobility issues.
Benefits
Enhancing sense of arrival.
Improves accessibility.
Reducing congestion in park and car use.
Beneficial for events.
Protecting the existing listed Gatehouse
and Bridge.
Calderglen Country Park  Executive Summary145

Page 146

CG6 Play: 
New pump track near existing
adventure play area
Enhanced Play Opportunities
A new pump track is to be located near
the existing play area. This location allows
proximity to the New Gateway Centre,
Entrance Plaza and Car Park, as well as
connections to the active travel route. The
pump track will provide an activity in a
format not currently available to visitors
in the park or elsewhere in East Kilbride,
particularly for children between 4 and 10
years old. The pump track will be designed
and installed by specialists to ensure they
provide suitable recreational value, are
robust, and easy to maintain.
Sustainability
Located in an existing open space it simply
requires remodelling of landforms. The
structure will be low maintenance and robust
and offer significant health and wellbeing
benefit in a stunning setting which will
encourage users to spend time accessing
other complimentary facilities in the park
ensuring they are more sustainable. The
position selected is an existing open space
used for picnics seeking to avoid any impact
on wildlife and nature.
Benefits
Expanding the offer for families.
Beneficial for health and wellbeing.
Immediate access for park users.
Complimentary to other facilities making
overall offer more sustainable.
CG7 Infrastructure: 
Power water/WiFi Infrastructure
distributed around the park for
events and new EV Charging
Points
Events Infrastructure
Currently, the park’s ability to host various
events is constrained by the operational
limits of existing services. Developing a
dependable power supply and services to
effectively support outdoor events would
be a more efficient solution than relying
on multiple generators across the site. This
infrastructure would enable the utilization
of green grid power, thereby diminishing
dependence on HVO or diesel generators and
promoting sustainability. This will broaden
the appeal of the events lawn. Alongside this
additional EV Charging Bays will be provided
next to the existing EV Charging Bays and
new ones will be provided in Colonsay Field.
Sustainability
The proposals will be sensitively integrated in
the landscape and enable existing facilities
to accommodate a wider range of events
and tourism contributing to the sustainability
of the park in a manner which protects the
wider landscape by managing the location of
particular uses.
Benefits 
Attracting more events and festivals whilst
enabling them to be managed more
sensitively.
Supporting tourism and broadening the
appeal of the park.
Supporting economic priorities in the area.
Calderglen Country Park  Executive Summary146

Page 147

Next Steps
Consultation and
Engagement
Further public engagement sessions were
held in each park during late August/early
September 2025 to share the proposed
strategic approach and present the draft
proposals.
Further stakeholder engagement including
with Elected Members and Area Committees
will be held in the Autumn/Winter of 2025.
Sustainability Impact
Assessment
A Sustainability Impact Assessment (SIA) has
been commissioned and will provide South
Lanarkshire Council with an assessment of
the likely impacts of the design proposals
contained within the South Lanarkshire
Council Calderglen Country Park Masterplan.
Forestry Management Plan
A comprehensive Forestry Management
Plan will be developed, clearly defining the
boundaries of Calderglen Country Park’s
Forestry Management Plan and its interface
with the proposed Stoneymedows Woodland
Management Plan (WMP) and East Kilbride
WMP.
Phasing
The Masterplan phasing plan balances
immediate wins, revenue generation,
accessibility improvements, and long-
term infrastructure development,
ensuring a strategic and financially
viable transformation. The early focus on
recreational and conservation assets builds
momentum, while later phases focus on
commercial sustainability, accessibility, and
futureproofing. By sequencing projects in
this way, the park maximises its impact while
ensuring efficient resource allocation and
minimal disruption.
Phase 1: Funding has already been secured
for the the new pump track. 
Future Phases: The Masterplan and
supporting documents will allow for
external funding bids to be prepared for
specific projects. The Priority Investments
are structured to enable each project to
be mobilised to suit funding requirements.
Calderglen Country Park  Executive Summary147

Page 148

Produced by Communications and Strategy. 068423/Aug25
If you need this information in another language or format, 
please contact us to discuss how we can best meet your needs.
Phone: 0303 123 1015 
Email: equalities@southlanarkshire.gov.uk
www.southlanarkshire.gov.uk
148

Page 149

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: New Lanark World Heritage Site Management Plan
2025 to 2030 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee on the production of the New Lanark World Heritage Site
Management Plan, to which South Lanarkshire Council is a signatory
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of the New Lanark World Heritage Site Management Plan 2025
to 2030 be approved by the Community and Enterprise Resources Committee
prior to its finalisation by New Lanark Trust.
[1recs]
3. Background
3.1. New Lanark is one of six World Heritage Sites (WHS) in Scotland and comprises a
historic mill village set in a gorge on the banks of the River Clyde, southwest of Lanark.
The historic village contains many uses including a visitor centre, exhibition space,
café, retail, hotel accommodation, tenanted and owner-occupied dwellings. New
Lanark is a major tourist destination within South Lanarkshire. 
3.2. To become a World Heritage Site, a site requires to meet criteria set out in Operational
Guidelines governed by UNESCO, concluding the site has outstanding universal
value. New Lanark gained World Heritage Site status in 2001. The aforementioned
Operational Guidelines require an appropriate Management Plan specifying how the
outstanding universal value will be preserved. South Lanarkshire Council is a member
of the of the WHS Partnership Group, alongside New Lanark Trust and Historic
Environment Scotland. 
3.3. South Lanarkshire Council is also responsible for a wide range of services which are
relevant to the management of New Lanark including planning, economic
development, housing, roads and education. South Lanarkshire Council is also a
landowner of King George’s field at Braxfield Terrace and New Lanark Primary School
sited within the World Heritage Site, and those adopted roads running into the site. 
11
149

Page 150

4. New Lanark World Heritage Site Management Plan 2025 to 2030
4.1. The Management Plan is based on a strategic view over 20-30 years providing a basis
for identifying and developing a framework for long term aims. The Management Plan
is then reviewed each five years to set out a shared vision, aims and short to medium
term objectives. This in turn guides those that are involved in making decisions which
affect the management of the World Heritage Site and surrounding buffer zone. 
4.2. There are four strategic objectives set out in the Management Plan including:-
 to safeguard and enhance the World Heritage Site and its environs
 to promote awareness and understanding of New Lanark’s Outstanding
Universal Value, authenticity and integrity
 to grow New Lanark as a visitor destination and strengthen the Site’s regional,
national and international profile
 to build a commercially and environmentally sustainable business 
4.3. These strategic objectives have been developed by using the outstanding universal
value as a basis. Then refined through community consultation carried out by the Trust
and collaboration between New Lanark Trust, South Lanarkshire Council and Historic
Environment Scotland. 
4.4. Within the Management Plan under each strategic objective there are more specific
objectives set out covering topics such as asset management, climate change,
accessibility of the site, interpretation of its assets, partnerships, care of collections,
visitor attractions, learning outreach, volunteering, marketing, organisational culture
and commercial strategy. The Management Plan assists in ensuring the running of
New Lanark remains in line with the outstanding universal value it received its World
Heritage Site status for. 
4.5. In conclusion, the strategic objectives of the New Lanark World Heritage Site
Management Plan are in accordance with many aims of the Council, including
strengthening partnerships, good quality places to live and thriving businesses.
Additionally, it is in accordance with the strategic vision and strategy of South
Lanarkshire Local Development Plan 2 to safeguard and improve natural and historic
environment. 
4.6  On this basis, it is recommended that Committee approve the contents of the World
Heritage Site Management Plan. On approval from South Lanarkshire Council and
Historic Environment Scotland, New Lanark Trust will then finalise the Management
Plan and following submission to UNESCO will be available on the New Lanark,
UNESCO and Historic Environment Scotland’s websites thereafter. 
5. Employee Implications
5.1. There is no employee implications associated with this report. 
6. Financial Implications
6.1. There is no financial implications associated with this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The impact on the historic environment has been a key consideration of the
Management Plan, as the overall aim is to preserve and protect New Lanark.
Furthermore, climate change and sustainable development are key considerations
within the Management Plan. 
150

Page 151

8. Other Implications
8.1. There are risks associated with not supporting the New Lanark Management Plan in
that without a key partner agreeing to the plan it would put New Lanark in breach of
the Operating Guidelines of its World Heritage Site Status. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not recommend a change to an existing policy, function or strategy
and, therefore, no impact assessment is required. New Lanark Trust ran consultation
across November 2024 to February 2025 to gather ideas, and then 17 July to 28
August 2025 on the Management Plan. South Lanarkshire Council ran consultations
associated with the Strategic Environmental Assessment. 
David Booth
Executive Director ( Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Planning Committee 29 January 2019 – New Lanark World Heritage Site Management
Plan 2019-2023 
List of Background Papers
 New Lanark World Heritage Site Management Plan 2025-2030 -
https://newlanark.org/about-new-lanark/world-heritage-site/ 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Fraser Carlin, Head of Planning and Regulatory Services
Email:  fraser.carlin@southlanarkshire.gov.uk 
151

Page 152

152

Page 153

NEW LANARK WORLD HERITAGE SITE
Management Plan 2025-2030
DRAFT COPY   
11
153

Page 154

1 
Contents
Foreword ................................................................................................................................................ 2
Chapter 1: The World Heritage Status and its significance for New Lanark ............................... 2
I. The World Heritage Convention and Outstanding Universal Value ...................................... 2
II. New Lanark's inscription as a World Heritage Site ................................................................. 3
New Lanark's World Heritage Status ........................................................................................ 3
Statement of Outstanding Universal Value .............................................................................. 4
Statement of Authenticity ............................................................................................................ 4
Statement of Integrity ................................................................................................................... 5
Chapter 2: The Management Plan for New Lanark World Heritage Site ..................................... 6
I. Necessity for a Management Plan ............................................................................................. 6
II. Purpose of the Management Plan ............................................................................................. 6
III. Consultation on the Management Plan ................................................................................... 6
IV. 2019-2023 Management Plan achievements ........................................................................ 7
Chapter 3: Vision, values & strategic aims 2025-30 ....................................................................... 9
I. Our purpose ................................................................................................................................... 9
II. Our heritage .................................................................................................................................. 9
III. Our values .................................................................................................................................. 10
IV. Our strategic objectives ........................................................................................................... 11
To safeguard and enhance the World Heritage Site and its environs ....................................... 11
To promote awareness and understanding of New Lanark’s Outstanding Universal Value,
authenticity and integrity ................................................................................................................... 13
To grow New Lanark as a visitor destination and strengthen the Site’s regional, national and
international profile ............................................................................................................................. 16
To build a commercially and environmentally sustainable business .......................................... 17
Chapter 4: Managing the World Heritage Site ............................................................................... 20
I. The State Party ........................................................................................................................... 20
II. The World Heritage Site Partnership Group .......................................................................... 20
III. The stakeholders ...................................................................................................................... 20
IV. Planning and public policy considerations ............................................................................ 21
Chapter 5: Implementation strategy for the Management Plan .................................................. 23
I. The Action Plan ........................................................................................................................... 23
II. Implementation considerations ................................................................................................ 23
III. Monitoring and reporting .......................................................................................................... 24
Appendices .......................................................................................................................................... 26 
154

Page 155

2 
Foreword
We are delighted to present the New Lanark World Heritage Site Management Plan for
2025–2030. As custodians of this internationally significant site, the New Lanark Trust,
Historic Environment Scotland, and South Lanarkshire Council remain committed to its
preservation, enhancement, and sustainable future.
As we enter this new chapter following a period of post-COVID recovery, collaboration
remains at the heart of our approach. Through strong partnerships, shared expertise, and
coordinated resources, we will continue to deliver innovative and impactful projects that
celebrate and sustain New Lanark’s heritage.
We extend our sincere thanks to everyone who has contributed to the development of this
Plan, including staff, partners, stakeholders, and volunteers. Their dedication ensures that
New Lanark will not only be safeguarded but will continue to inspire, educate, and be
enjoyed for generations to come.
Chapter 1: The World Heritage Status and its significance for New Lanark 
World Heritage encompasses the most exceptional cultural and natural treasures of
humanity, recognised for their global significance by the United Nations Educational,
Scientific and Cultural Organisation (UNESCO). These sites, selected for their unique
qualities or exemplary status, represent shared heritage and belong to everyone. With over
1,000 sites worldwide, UNESCO oversees the World Heritage List, adding or removing
locations based on strict criteria.
Member states, such as the UK, nominate sites for inscription following UNESCO’s
comprehensive guidelines. The overarching goal of the list is to identify, protect, conserve,
and showcase the world’s irreplaceable heritage. Each listed site must continuously
demonstrate compliance with the obligations outlined in the World Heritage Convention,
ensuring its value is preserved for future generations. 
I. The World Heritage Convention and Outstanding Universal Value 
The global responsibility to protect the world’s most valuable heritage is upheld through the
World Heritage Convention (WHC) and its Operational Guidelines for the Implementation of
the World Heritage Convention. Adopted by UNESCO in 1972, the WHC defines the types of
sites eligible for inclusion on the World Heritage List and outlines standards for their
identification, protection, and preservation.
By nominating a site, States Parties affirm their commitment to the WHC’s goals of
safeguarding and conserving heritage for future generations. The UK ratified the WHC in
1984, pledging to identify, protect, and preserve its World Heritage Sites as part of a shared
universal heritage.
The UK and its Overseas Territories boast 35 UNESCO World Heritage Sites, including
seven in Scotland. The WHC’s Operational Guidelines provide a framework to ensure the
long-term protection and presentation of these irreplaceable treasures. The concept of
Outstanding Universal Value (OUV) is fundamental to the World Heritage designation. It
signifies the exceptional cultural and/or natural significance of a site which is so
extraordinary as to transcend national boundaries and be of importance for present and
future generations worldwide. To be deemed of Outstanding Universal Value, a site must
meet at least one of ten criteria specified in the Convention's Operational Guidelines. The
155

Page 156

3 
key distinction between World Heritage Sites (WHSs) and nationally recognised or
designated sites is the requirement for WHSs to demonstrate Outstanding Universal Value
(OUV).
Defined in UNESCO's Operational Guidelines, OUV refers to “cultural and/or natural
significance so exceptional that it transcends national boundaries and is of common
importance for present and future generations of all humanity.” This means that a site’s
values must have global relevance, extending beyond its national context. To qualify as
having OUV, a site must satisfy at least one of ten assessment criteria outlined in the
Operational Guidelines. Additionally, sites must meet conditions of Authenticity and Integrity.
Decisions on inscription are made by UNESCO’s World Heritage Committee, following
evaluations by expert advisory bodies: ICOMOS (International Council on Monuments and
Sites) for cultural properties and IUCN (International Union for Conservation of Nature) for
natural properties. 
II. New Lanark's inscription as a World Heritage Site 
On 14 December 2001, New Lanark was formally inscribed on the UNESCO World Heritage
List, recognised for its demonstration of Outstanding Universal Value under three specific
criteria:
A. Criterion (II) - New Lanark represents a significant exchange of human values over
time, profoundly influencing developments in architecture, technology, monumental
arts, town planning, or landscape design. The village's foundation, under the vision of
David Dale and Robert Owen, heralded a new era in industrial community living,
which was to become a model replicated globally in the ensuing centuries.
B. Criterion (IV) - As an exemplary instance of a type of building, architectural or
technological ensemble, New Lanark encapsulates significant stages in human
history. The village is distinguished by its well-conceived worker housing and public
buildings, designed with a deep understanding of the needs for educational and
recreational spaces, as well as the physical well-being of its inhabitants.
C. Criterion (VI) - New Lanark is intrinsically linked with events, living traditions,
ideas, beliefs, and artistic and literary works of outstanding universal significance,
particularly through its association with Robert Owen. His vision and social reforms at
New Lanark laid the groundwork for future developments in education, factory
reform, and social welfare that have left a lasting impact on society.
The Statement of Outstanding Universal Value for each World Heritage Site defines the
elements that confer its significance, and what must be protected to maintain this status. It is
developed using the original nomination document, evaluations by the advisory bodies to
UNESCO, and the decision of the World Heritage Committee at the time of inscription. This
statement guides the assessment of potential threats to the site and outlines the framework
for its continued protection. 
New Lanark's World Heritage Status 
New Lanark stands as a remarkable testament to the social and technological
advancements of the Industrial Revolution. Founded by David Dale and later developed by
Robert Owen, the village represents a pioneering integration of industrial innovation with
progressive worker welfare, educational provision, and community living. This unique
156

Page 157

4 
approach not only transformed the local area but also set a global precedent for the design
of industrial communities.
New Lanark’s inscription as a UNESCO World Heritage Site highlights its exceptional
significance in technological achievement, architectural design, and social reform. The
village's preserved layout, buildings, and natural surroundings offer a vivid connection to its
history while reflecting the ideals that shaped its development. Conservation efforts are
guided by principles of authenticity and integrity, ensuring all interventions respect the site’s
cultural and historical context.
As a World Heritage Site, New Lanark carries the responsibility of educating and engaging
current and future generations. Through research, interpretation, and community
engagement, it remains a place of learning and innovation, showcasing the enduring
relevance of its heritage in addressing contemporary challenges.
The site’s management is firmly committed to the principles of the World Heritage
Convention, aiming to preserve and enhance its Outstanding Universal Value. This
Management Plan outlines strategic objectives to protect New Lanark’s heritage, promote its
global significance, and ensure sustainable development for the benefit of generations to
come. 
Statement of Outstanding Universal Value 
New Lanark is an outstanding example of an 18th-century purpose-built mill village, nestled
in the scenic Scottish landscape near the Falls of Clyde. In the early 19th century, it became
a pioneering model of industrial and social reform under Robert Owen, regarded as a
Utopian visionary who built on the altruistic foundation laid by his father-in-law, David Dale.
Owen's innovative management approach combined industrial success with a commitment
to improving workers' lives.
Founded in 1785, New Lanark's cotton mills, powered by water wheels, began operation in
1786 and continued until 1968. By the early 19th century, the village housed one of the
world's largest industrial complexes. Uniquely, it integrated planning and architecture with a
humane ethos, marking a milestone in social and industrial history.
The principles established at New Lanark- emphasising moral, social, and environmental
values- had profound and lasting impacts, shaping developments in welfare, education, and
industrial practices over the past two centuries. The village demonstrated that industrial
prosperity need not come at the expense of workers' well-being. Its design and ethos
inspired other benevolent industrialists and influenced movements such as Ebenezer
Howard’s Garden City concept.
Today, New Lanark’s impressive mill buildings, thoughtfully designed workers' housing, and
educational institute and school stand as enduring symbols of Owen’s progressive
humanism and a testament to the potential for industry to uplift, rather than exploit, its
workforce. 
Statement of Authenticity 
The processes of restoration and regeneration, conservation and rehabilitation at New
Lanark have now been in progress for almost half a century. Major projects continue to the
present day. The façade of the village has remained little changed from its heyday of cotton
production in the early nineteenth century. Where elements are missing or have been
157

Page 158

5 
replaced, the site is clearly interpreted to reflect this. Where rebuilding or reconstruction
have been necessary, this has been carried out to the highest possible conservation
standards, based on full historic records. Repair and restoration have been undertaken using
appropriate traditional materials and workmanship, following original designs wherever
possible, and always respecting existing historic fabric. The original weir, lade and
waterways which provided waterpower to the mills from the 1780s are still in use today. 
Statement of Integrity 
The appearance of the village’s buildings is now close to that of the early 19th century, as it
would have been during Owen’s management, based on the physical evidence,
archaeological, graphic and written archive material available. In restoring the village to its
historic state, some later 20th century structures have been removed, and in doing so
focusing on those elements that contributed to the site’s Outstanding Universal Value. 
158

Page 159

6 
Chapter 2: The Management Plan for New Lanark World Heritage Site 
I. Necessity for a Management Plan 
The United Kingdom, as a signatory to the World Heritage Convention, has obligations
regarding the effective stewardship of World Heritage Sites. These obligations necessitate
that each Site is supported by an appropriate management structure. These Plans are
recognised as material considerations within the planning system. Adhering to the advice
outlined in the ‘Operational Guidelines for the Implementation of the World Heritage
Convention’, Management Plans should undergo regular reviews, monitoring, evaluation,
and updates.
The development of a Management Plan involves the amalgamation of all key partners to
agree on a shared vision for the future of the site. The subsequent implementation of the
Management Plan depends on the effective collaboration and commitment of these and
other stakeholders to advance actions. The management of the New Lanark World Heritage
Site falls under the remit of the New Lanark World Heritage Site Partnership Group, which
includes New Lanark Trust, Historic Environment Scotland, and South Lanarkshire Council. 
II. Purpose of the Management Plan 
The primary aim of a Management Plan is to guide the effective management of a World
Heritage Site in a way that safeguards its unique character and ensures the preservation of
its Outstanding Universal Value (OUV). Strategic objectives and actions within the plan are
developed based on an analysis of the site’s significance, heritage condition, and specific
developmental needs. This ensures targeted, site-specific management while demonstrating
to UNESCO that robust mechanisms are in place for the site’s long-term conservation.
The New Lanark World Heritage Site Management Plan provides a framework for protecting,
enhancing, and promoting the site and it’s OUV. It outlines a shared purpose, values, and
strategic objectives to guide decision-making by all stakeholders. Successful implementation
depends on collaboration and commitment from all involved parties, with the plan serving as
a cornerstone for detailed, long-term decision-making.
To maximise its impact, the Management Plan’s values and objectives should align with and
influence other local plans, strategies, and guidance. Covering a five-year period (2025–
2030), the plan will be reviewed and updated in line with UNESCO’s guidance to reflect
ongoing needs and long-term aspirations for New Lanark. Some objectives extend beyond
the plan’s timeframe, underpinning the site’s vision for the future.
This Management Plan is not intended to provide a full historical or physical analysis of New
Lanark but should be read alongside complementary documents such as the Nomination of
New Lanark for Inscription in the World Heritage List (Historic Environment Scotland, 2000)
and the relevant South Lanarkshire Council appraisals.   
III. Consultation on the Management Plan 
Between November 2024 and February 2025, New Lanark Trust conducted public and
partner consultations to review the site's purpose, heritage, values, strategic objectives, and
areas for development, alongside an outline strategy for implementation. Feedback gathered
159

Page 160

7 
during this process has directly informed the Management Plan and its accompanying Action
Plan. The approach to community consultation was refined to separately engage with New
Lanark village residents and the broader community of site users. This distinction provides a
clearer understanding of the unique experiences of the people living in 72 mixed tenure
homes within the site, enabling a stronger focus on resident wellbeing and community
relationships. 
Resident Consultation: Key survey findings highlight the unique lived experience of New
Lanark residents. 43% have lived onsite for over 10 years, with greenspaces and walking
routes being their most used areas. Almost all engage with parts of the site daily, with dining
facilities also a key feature. While connections to onsite events vary, 81% want more
opportunities to participate. Residents see tourism as beneficial, boosting the local economy
and community pride, with 71% hoping to see visitor levels grow. Improved communication
with the Trust and greater involvement in events were identified as priorities. Following the
survey, residents joined a consultation evening to discuss the management plan, Trust
values, and strategic objectives, agreeing on enhanced communication moving forward.
Community Consultation: Key survey findings highlight visitors' strong appreciation for New
Lanark’s scenery and outdoor spaces, with green spaces and walking routes being the most
engaged-with aspects of the site. Most regular visitors live within 30 miles, and while over a
quarter visit monthly or more, the majority come a few times a year. Overall, 80% rate their
experience as Good or Excellent, and many express pride in living near a World Heritage
Site, recommending it to others. Lower engagement in some areas of the site aligns with
post-COVID shifts toward outdoor community spaces. Visitors prioritise guided heritage
education, outdoor activities, and family-friendly events for future programming and
development. 
IV. 2019-2023 Management Plan achievements 
Commercial Activities: The Trust’s trading subsidiaries continue to manage New Lanark’s
commercial operations, supporting local employment, skill development, and generating vital
funds for reinvestment in the site. Seasonal events, including the popular Christmas
Experience, play a key role in driving footfall, revenue, and community engagement.
Hydro Power Turbine Restoration: In late 2019, New Lanark’s hydro power turbine
experienced a ‘catastrophic failure.’ As a vital and historic component of the site’s
sustainability efforts, the turbine generates significant green energy to power many of the
buildings within the village. Thanks to full funding from the Scottish Government,
refurbishment was successfully completed in February 2023, ensuring the continued
production of renewable energy for the site.
Grant Funded Projects: Since July 2020, New Lanark has received significant support from
Historic Environment Scotland and Scottish Government funding. This support has been
instrumental in helping the site navigate challenges posed by Covid-19 and other financial
pressures, reinforcing its resilience and long-term sustainability. In July 2023 The National
Heritage Memorial Fund awarded a grant for building and maintenance of £2.4m through its
COVID 19 Response Fund. This will enable specific work to be carried out across various
buildings onsite.
Redevelopment and Revitalisation: In 2024, New Lanark secured planning permission from
South Lanarkshire Council for the redevelopment of two key buildings, further strengthening
the village’s vibrancy. The former youth hostel, which has been out of use since the
pandemic, will be transformed into four individual townhouses. This initiative will bring an
unused building back into residential use and contribute to the growing community of owner-
occupiers within the village, following the successful model of Double Row. David Dale’s
160

Page 161

8 
House, historically used for small commercial lets and storage, will also be repurposed to
add to the visitor experience. 
Shuttle Bus: The introduction of the electric shuttle bus in 2020 has significantly improved
access between the car park and Visitor Centre, enhancing visitor safety, visitor support, and
reducing congestion. This service runs daily during opening hours.
Award-Winning New Lanark Mill Shop: The New Lanark Mill Shop was awarded Best Gift
Shop at the 2023 Scottish Business Awards, recognising its exceptional retail offering,
commitment to high-quality products, and outstanding customer service. The shop offers a
diverse range of hand-crafted textiles, traditional Scottish gifts, books, locally produced food
items, and bespoke souvenirs, all selected with an emphasis on sustainability and support
for local artisans. This recognition highlights the shop’s success in creating a unique and
engaging retail experience while contributing to the wider preservation and promotion of New
Lanark’s cultural and historical significance.
Townscape Heritage & Conservation Area Regeneration Scheme (2015–2020): We
successfully completed a major four-year regeneration project, supported by the Heritage
Lottery Fund’s Townscape Heritage Programme, Historic Environment Scotland’s CARS
scheme, South Lanarkshire Council, and The Wolfson Foundation. Beginning in early 2016,
the project focused on restoring the last empty block of millworkers' housing on Double Row.
A key feature, the Museum Stair, with original sinks, box beds, linoleum, and layers of
wallpaper, was carefully conserved and stabilised. As the interior is not publicly accessible, it
was digitally recorded and transformed into an immersive exhibition in Robert Owen’s
School for Children, allowing visitors to virtually explore how the space evolved over 200
years. The project also delivered a rich programme of heritage-based activities, including
traditional building skills training, talks, tours, and the popular ‘House History’ initiative, which
brought the story of Double Row to life across multiple time periods.  
161

Page 162

9 
Chapter 3: Vision, values & strategic aims 2025-30 
I. Our purpose 
ICOMOS advises that management plans for World Heritage Sites should be based on a
strategic view over 20-30 years. This strategic vision provides the basis for identifying and
developing a framework of longer term aims, which in turn inform the priorities for the
medium to short term specific objectives which are set out in the following section. The
Management Plan has a five-year lifespan, from 2025-2030, but many of its aims and
objectives will be relevant for longer and guide the future management of the site. New
Lanark Trust is the Registered Scottish Charity responsible for the management of New
Lanark World Heritage Site, and the Trust is committed to: 
• Conserve its heritage, site and environs
• Contribute socially and economically to the area
• Evolve to stay relevant to our people and the world
To conserve: The Trust is entrusted with the preservation of New Lanark's unique heritage, a
responsibility that encompasses the maintenance and care of its built and natural
environments. This commitment to conservation ensures that the site's architecture, along
with its picturesque landscapes, continue to captivate and educate future generations. Our
conservation efforts are guided by principles of authenticity and integrity, ensuring that any
interventions are respectful of the site's historical fabric and its Outstanding Universal Value.
To contribute: New Lanark is more than a monument to the past; it is a living community with
a vibrant present and a dynamic future. As custodians of this heritage, we aim to contribute
to the social and economic well-being of the local area and beyond. Through educational
initiatives, community engagement, and the promotion of sustainable tourism, we strive to
make New Lanark a source of inspiration a catalyst for positive change. Our programmes
and activities are designed to build a deeper understanding and appreciation of the site's
historical significance, while also addressing contemporary social and environmental issues.
To evolve: Recognising the ever-changing context in which we operate, the Trust is
committed to ensuring that New Lanark remains relevant and responsive to the needs of
today's society. This involves a proactive approach to innovation, embracing new
technologies and methodologies to enhance the visitor experience and to broaden our
reach. We are dedicated to exploring new ways of interpreting and presenting New Lanark's
rich heritage, making it accessible and engaging for a diverse global audience. Our
commitment to evolution also means actively seeking opportunities for collaboration and
partnership, using the site's World Heritage status to advocate for heritage conservation and
sustainable development on a wider scale.
In embracing these principles, the New Lanark Trust aspires to uphold the visionary ideals of
its founders. Our purpose is not only to preserve the physical legacy of New Lanark but also
to continue its ethos of innovation, community, and social progress. 
II. Our heritage 
New Lanark, set within the dramatic landscape of the Clyde Gorge in Scotland, exemplifies
the social and technological advancements of the Industrial Revolution. Its architecturally
ambitious mills, built along the fast-flowing River Clyde, showcase innovative industrial
design against a backdrop of natural beauty. The site reflects the combination of economic
162

Page 163

10 
ambition with a commitment to social progress; a vision realised by its founder David Dale
and later expanded by Robert Owen.
Origins and enlightenment ideals: Founded on a combination of David Dale's
entrepreneurship and Richard Arkwright's industrial innovations, New Lanark exploited the
abundant waterpower of the Clyde and addressed the rural displacement of rural workers
during the Agricultural Revolution. New Lanark embodied Enlightenment principles of
economic theory, education, and workforce welfare. Backed by local landowners, Glasgow
merchants, and the aristocracy, Dale’s enterprise brought new wealth and employment to
the area. The picturesque setting, already celebrated by 18th-century writers and artists,
provided a stage for this pioneering industrial and social experiment. This context enhances
the site's Outstanding Universal Value (OUV), integrating both its physical and cultural
heritage.
Industrial and architectural innovation: New Lanark’s built environment is a model of early
industrial community planning. Its spatial organisation groups industrial, residential, and
social buildings in a layout shaped by the steep terrain. The mills are monumental in scale,
reflecting classical architectural influences, and illustrate advancements in construction
methods, culminating in the fireproof, iron-framed Mill 3 in the 1820s. The steep tenement
housing represents the most extensive surviving example of multi-storey 18th-century
housing in Britain, designed to accommodate the challenges of the site’s topography.
A legacy of social reform: David Dale’s philanthropy and religious values shaped the village’s
initial development. He provided improved-quality housing, education, and enhanced living
conditions for workers, including the 800 orphaned children employed in the mills. Although
their work was demanding, Dale ensured they were housed, fed, and clothed- an uncommon
practice at the time. He also encouraged Scots to settle in New Lanark as an alternative to
immigrating to America following the highland clearances.
Robert Owen, New Lanark’s most famous figure, expanded Dale’s vision, implementing
progressive reforms that transformed the village into a global model of industrial and social
welfare. Owen improved housing, healthcare, and working conditions, and established a
revolutionary education system through institutions like the New Institution for the Formation
of Character. He described his work as "the most important experiment for the happiness of
the human race." Owen’s publications, including A New View of Society, inspired
movements for education reform, factory legislation, and international cooperation,
influencing concepts such as garden cities.
Technological and industrial heritage: New Lanark’s origins lie in the principles of Richard
Arkwright, whose water-powered spinning technology revolutionised cotton production. By
1813, New Lanark had become Scotland’s largest mill complex. Innovations by works
manager William Kelly in heating, ventilation, and machinery design, including the ‘self-
acting mule,’ positioned the village at the forefront of industrial progress.
Later diversification under the Gourock Ropework Company introduced new skills and
machinery. The village attracted workers from Ireland and the Isle of Man, while auxiliary
steam power and modern water turbines replaced the original waterwheels by 1930.
A unique legacy: New Lanark’s physical and social legacy is a powerful reminder that
industrial success need not come at the expense of human welfare. It demonstrates the
possibility of integrating technological innovation with a humane approach to community and
workforce management. Today, New Lanark continues to inspire, offering a living example of
the transformative potential of Enlightenment ideals and industrial ingenuity. 
III. Our values 
163

Page 164

11 
Our values guide everything we do at New Lanark, shaping our approach to conservation,
community, and sustainability:
• Authentic - We celebrate New Lanark’s outstanding natural and built heritage,
preserving its unique character as a living, working and inclusive community with real
stories to tell.
• Responsible - As a registered charity, we are committed to conserving our heritage,
creating opportunities for employment and skills development, and ensuring long-
term environmental and financial sustainability.
• Industrious - We strive to provide an engaging and inclusive visitor experience, build
strong partnerships, and continue New Lanark’s legacy of innovation and social
enterprise.
• Ambitious - We aim to enhance New Lanark’s role on the global stage, increasing its
impact in culture, tourism, business, and education while developing it as a hub for
learning and innovation. 
IV. Our strategic objectives 
Our approach to managing and sustaining the New Lanark World Heritage Site is guided by
four key strategic objectives. These objectives ensure that we protect and enhance the site
while promoting its global significance, strengthening its role as a visitor destination, and
securing its long-term sustainability. Each objective will be expanded upon in this section to
outline our commitments and actions.
To safeguard and enhance the World Heritage Site and its environs 
1. Conservation, maintenance, and development
1.1 Maintenance and renovation
Ongoing maintenance and renovation of New Lanark's historic buildings are crucial to
preserving its Outstanding Universal Value (OUV). This includes:
• Regular inspections and proactive conservation of key structures.
• Restoration of vacant or derelict properties and structures to bring them into use.
• Implement targeted monitoring and maintenance of high-risk structural elements,
including retaining walls, while actively exploring funding opportunities to support
these preservation efforts.
• Ensuring all conservation efforts align with UNESCO World Heritage Site policies. 
1.2 Traffic and parking
A focus on reducing congestion and enhancing pedestrian safety will help protect the site's
character while improving accessibility. Key actions include:
• Improved signage and visitor flow management.
• Measures to control traffic and parking to minimise impact on the historic setting. 
1.3 Accessibility
Ensuring inclusive access for visitors and staff through:
• Maintaining clear, obstacle-free paths, entryways, and facilities through regular
checks and upkeep.
• Using portable ramps or temporary solutions where permanent installations aren't
feasible.
• Improving signage and wayfinding to support easier navigation for all users.
• Adjusting existing layouts (e.g. furniture or display placement) to create wider, more
accessible routes.
164

Page 165

12 
1.4 Public spaces
Plans will be developed to promote our green spaces, play areas, and walking routes,
ensuring a balance between conservation and community use. Key actions include:
• Improve existing landscaping to enhance accessibility, navigation, and the overall
visitor experience.
• Strengthen connections between built and natural features like the River Clyde and
woodlands through clearer paths and visual links.
• Use interpretation, signage, and digital tools to promote awareness and engagement
with the site’s natural assets. 
1.5 Buildings and built structures
To ensure sustainable conservation and development, New Lanark will:
• Explore temporary or flexible uses for underutilised spaces that align with the site's
heritage and visitor needs.
• Balance restoration efforts with commercial and visitor needs to support sustainable
tourism. 
2. Asset management
2.1 Management and planning
New Lanark will continue to prioritise effective stewardship of its heritage assets through:
• Ongoing care and thoughtful use of historic buildings and infrastructure, guided by
long-term sustainability.
• Periodic reviews and updates to maintenance approaches, drawing on best practices
and evolving sustainability standards.
• Proactive collaboration with local authorities, stakeholders, and private owners to
support shared goals and coordinated action. 
2.2 Woodland management
To highlight and enhance the natural environment while embedding sustainability in current
and future projects, key actions include:
• Promoting biodiversity through ongoing conservation efforts that are integrated into
site activities.
• Strengthening partnerships with organisations such as the Scottish Wildlife Trust to
support shared environmental goals.
• Encouraging community participation by incorporating sustainability themes into
existing educational programmes and practical conservation projects. 
• Embedding sustainable practices and natural environment considerations into all
relevant developments and site management activities. 
2.3 Ongoing and future projects
To support long-term sustainability, New Lanark will engage with major capital projects in the
coming years, including:
• Structural repairs and maintenance, and conservation work on key buildings and
infrastructure.
• The regeneration and enhancement of key visitor areas, strengthening the site's
appeal as a leading destination and ensuring long-term engagement and relevance.
• Advance sustainable energy initiatives, including potential hydroelectric
developments, aiming to improve energy efficiency and position the Site as a model
of environmental best practice. 
3. Policy and protection
165

Page 166

13 
3.1 World Heritage Site and buffer zone protection
To safeguard New Lanark and its buffer zone, actions include:
• Ensuring all developments align with World Heritage guidelines.
• Preventing inappropriate development that could impact key views or the Site's
character.
• Ensuring all developments comply with relevant environmental planning legislation
and regulatory frameworks, supporting responsible and sustainable site
management. 
3.2 Preservation and enhancement of built and natural features
A collaborative approach to conservation will:
• Strengthening collaboration with residents, landowners, and conservation bodies to
support shared stewardship
• Integrating improvements into existing work, such as planting, repairs, or signage,
that contribute to overall landscape quality.
• Encouraging community involvement in practical conservation activities. 
3.3 Climate change and environmental risks
To mitigate climate risks, New Lanark will remain mindful of guidance from relevant advisory
bodies and:
• Identify and assess potential climate change risks to the Site and its assets and
proactively develop feasible adaptation measures to mitigate their impact.
• Support the continued use and maintenance of sustainable energy sources, including
hydroelectric power.
• Strive to implement greener, low-impact practices in daily operations wherever
feasible, while remaining cognisant of and aligned with relevant environmental
legislation and policy frameworks. 
3.4 Access and interpretation of the landscape
To improve public engagement with the site's built and natural heritage, actions include:
• Enhancing visitor signage, information materials, and interpretative resources.
• Addressing traffic flow concerns through collaboration with local authorities.
• Working towards more sustainable tourism strategies to balance visitor experience
with conservation.
To promote awareness and understanding of New Lanark’s Outstanding Universal Value,
authenticity and integrity 
1. Interpretation of the World Heritage Site 
1.1 Strategic Interpretation
To ensure interpretation of New Lanark’s tangible and intangible cultural heritage is
conveyed thoroughly
• Identify and understand key audience groups to tailor interpretation that is relevant,
engaging, and accessible to our visitors.
• Maximise use of existing interpretive assets through cost-effective updates and
enhancements, ensuring accessibility remains central to all materials and
experiences.
• Align interpretation development with key findings and products from partners and
stakeholders to maintain consistency and strengthen collaborative impact.
• Provide a holistic narrative that integrates New Lanark’s historical, environmental,
and cultural significance.
• Develop thematic programmes that connect site stories with contemporary global
issues such as sustainable living, labour rights, and community wellbeing.
166

Page 167

14 
• Emphasise New Lanark’s natural heritage alongside its history, incorporating
environmental education into the interpretive framework.
• Ensure cohesive messaging across staff and volunteers to unify visitor experience
and accurately convey New Lanark’s Outstanding Universal Value (OUV).
1.2 Visitor Attraction development
• Enhance accessibility of interpretation by improving and adapting current visitor
routes to support diverse learning styles through clear signage, engaging guides, and
interactive elements.
• Use existing historical materials and stories more effectively to provide a fuller, more
inclusive timeline of New Lanark’s evolution
• Refresh the presentation of key historical sites by reworking existing displays and
content, working with academic and cultural partners to ensure accuracy and
innovative educational approaches.
• Explore opportunities to update and upgrade the visitor experience. 
1.3 Digital and remote provisions
• Maintain an up-to-date digital presence, ensuring online and educational resources
are accessible globally.
• Engage staff and volunteers in creating digital content that provides insights into New
Lanark’s stories and upcoming events.
• Establish partnerships with educational organisations to promote New Lanark as a
centre for virtual learning, offering remote engagement opportunities. 
2. Partnerships
2.1 Lanark and local collaborations
• Continue and enhance relationships with local community groups to develop
affordable, mutually beneficial projects that enhance wellbeing and engagement.
• Use New Lanark’s environment and resources to create meaningful, accessible
opportunities that help unlock the site’s full potential. 
2.2 Heritage and cultural organisations
• Collaborate with cultural sites on thematic programmes, exhibitions, and events to
enrich New Lanark’s heritage offerings.
• Strengthen strategic partnerships with heritage and cultural organisations to share
expertise, strengthen collective impact, and support collaborative approaches to
preservation, interpretation, and sustainable site management. 
2.3 Academic partnerships
• Establish academic partnerships for research and learning in heritage, tourism,
STEM, and environmental studies.
• Promote New Lanark as a point of reference within academic programmes and
curriculums. 
3. Care and development of the collection
3.1 Collections management
• Improve collections management through digitisation and development of dedicated
research spaces.
• Conduct research to uncover untold stories within the collection, adding depth to
visitor engagement and understanding of the site.
• Enhance accessibility through digital tools, tactile archives, and interactive displays.
• Develop policies on acquisitions, conservation, and deaccessions to ensure
sustainable stewardship.
167

Page 168

15 
3.2 Users and customers
• Ensure flexible access to archival materials, supporting remote research where
feasible.
• Recruit and train volunteers and students to assist with research and cataloguing,
encouraging community engagement. 
3.3 Outreach and accessibility
• Increase visibility of collections online and highlight key artefacts through exhibitions
and digital storytelling.
• Develop object-based learning opportunities for educational visits.
• Engage schools, universities, and local community groups in reinterpretation projects
to ensure New Lanark’s history reflects the diverse perspectives and experiences of
the people who live nearby and visit the site. 
3.4 Research strategies and frameworks
• Participate in data-sharing projects to support collaborative research.
• Regularly analyse demographic and tourism trends to align heritage programming
with contemporary issues.
• Work with academic institutions to develop research on subjects relevant to our site
goals, such as tourism, education, and industrial heritage. 
4. Learning, outreach, and access
4.1 Core learning offer
• Maintain and improve existing educational programmes, ensuring alignment with
national and international curricula.
• Identify and address gaps in current provision, with a focus on better engaging
underrepresented groups, including learners with additional support needs and
neurodiversity.
• Develop inclusive resources and adapt existing materials to improve accessibility
across a wider range of learning needs.
• Conduct annual reviews to keep programmes relevant, impactful, and responsive to
feedback.
• Promote equity by prioritising accessible opportunities for South Lanarkshire
education groups, particularly in areas of multiple deprivation. 
4.2 Promotion and visibility
• Enhance promotion of educational offerings through social media, website and
mailing lists.
• Explore partnerships with educators and learners to co-create hands-on learning
experiences. 
5. Placements and volunteering
5.1 Volunteer programme
Develop robust recruitment, training and review strategy for volunteers, ensuring
meaningful roles in site operations as well as enhancing the overall visitor experience.
Strengthen volunteer relationships with Trust staff through regular meetups, inclusion in
core training, and ongoing communication to keep them informed and engaged.
Recognise and celebrate volunteers and their contributions. 
5.2 Student placements
168

Page 169

16 
• Establish links with university departments to embed site-based learning into
curricula and create ongoing placement opportunities aligned with relevant degree
subjects.
• Provide structured mentorship and meaningful research opportunities for students.
• Expand placement opportunities to include fields beyond heritage, such as STEM
and environmental sciences to attract students across multiple disciplines and at
varied levels of study.
• Explore opportunities for work experience placements and career development
initiatives for school-aged students.
To grow New Lanark as a visitor destination and strengthen the Site’s regional, national and
international profile 
1. Transport and routes
1.1 Route planning
• Identify and address gaps in transport information or accessibility to improve overall
visitor journey planning and parking.
• Produce clear, user-friendly transport guides (digital and print) tailored for public
transport users, drivers, cyclists, and travel trade visitors. 
1.2 Promotion and marketing  
• Develop user-friendly transport maps, highlighting routes from major locations such
as Glasgow and Edinburgh, incorporating multiple travel options (car, train, bus, and
shuttle service).
• Collaborate with tourism boards and travel operators to position New Lanark as a key
cultural destination in Scotland.
• Utilise social media and tourism platforms to promote accessibility and the visitor
experience, inclusive of scenic travel routes, trails and sustainable transport options. 
1.3 Onsite and offsite signage
• Develop a user-friendly visitor map highlighting key routes, interpretation points, and
amenities.
• Ensure maps clearly inclusive of parking areas, toilets, picnic spots, and accessible
routes to enhance inclusivity.
• Ensure Wi-Fi availability is well-publicised at the Visitor Centre and key areas,
supporting self-guided tours, interactive exhibits, and digital resources.
• Promote the use of digital guides, paperless ticketing, and mobile-accessible visitor
tools, enhancing engagement while aligning with wider sustainability goals. 
2. Marketing, sales, and promotion
2.1 Marketing strategy
• Establish a robust marketing strategy that enhances New Lanark’s appeal regionally,
nationally, and internationally while preserving its cultural and historical significance.
• Conduct research to define and understand target demographics (families, tourists,
history enthusiasts, educational groups, and international visitors).
• Develop campaigns rooted in storytelling, showcasing New Lanark’s heritage,
cultural relevance, and community impact.
• Build an annual events calendar, including seasonal festivals, tours, and educational
workshops, promoted via regional tourism boards, travel websites, and social media.
169

Page 170

17 
• Collaborate with local tourism bodies, hospitality partners, educational institutions,
and international travel operators, leveraging cross-promotional opportunities to
expand reach.
2.2 Fundraising and sponsorship
• Lead public-facing campaigns to support key projects through engaging, interactive
initiatives.
• Establish a membership program with exclusive benefits to encourage sustained
support.
• Create and implement fundraising and sponsorship strategies aligned with site
development priorities.
• Pursue grant funding opportunities to advance organisational projects.
3. Digital strategy
3.1 Website
• Strengthen New Lanark’s digital presence to reach broader audiences and foster
community engagement.
• Improve website navigation, booking systems, and accessibility features, ensuring
seamless access to event schedules, ticketing, and visitor information.
• Incorporate high-quality images, virtual tours, and visitor testimonials to bring New
Lanark’s story to life.
• Develop an intuitive, secure donation portal to facilitate direct contributions to
conservation efforts. 
3.2 Social media and digital outreach
• Strengthen New Lanark’s digital presence to engage broader audiences, drive visitor
interest, and strengthen community connections.
• Collaborate with travel bloggers and heritage advocates to promote New Lanark’s
landscapes, history and experiences.
• Run targeted digital and media ad campaigns to highlight events, exhibitions and
offers. 
3.3 Newsletters and e-marketing
• Use newsletters and e-marketing to inform, engage, and encourage repeat visits.
• Produce a seasonal newsletter featuring upcoming events, stories and opportunities
for support and involvement.
• Integrate surveys and feedback tools to gather visitor insights, refining programming
and services accordingly.
• Use data analytics to monitor engagement, adapting content for continuous
improvement.
To build a commercially and environmentally sustainable business 
1. Business sustainability
1.1 Commercial strategy
• Regularly review trading subsidiaries to ensure operational efficiency and alignment
with the site’s values and objectives.
• Continuously evaluate sales and marketing strategies to maximise income,
engagement, and sustainability.
• Support staff development through ongoing training and cross-department
collaboration to strengthen skills, and support succession planning.
• Develop integrated commercial strategies for cross-site experiences that optimise
use of site assets, such as hotel, restaurant, and visitor centre. 
170

Page 171

18 
• Consider opportunities to enhance the site's long-term financial resilience in
alignment with its core values and World Heritage designation.
• Identify and implement sustainable business practices to support long-term
environmental and financial resilience. 
1.2 Fundraising strategy
• Create a targeted fundraising strategy, identifying new opportunities across public,
private, and grant funding streams.
• Cultivate partnerships with aligned corporate and commercial organisations to
support long-term financial sustainability. 
1.3 Membership programme
• Establish a structured membership programme for financial supporters.
• Introduce tiered membership options catering to individuals and businesses,
particularly those with corporate social responsibility (CSR) initiatives.
• Define clear membership benefits, ensuring value for supporters while reinforcing
New Lanark’s sustainability and growth objectives. 
2. Environmental sustainability
2.1 Environmental Initiatives
• Identify and adopt more energy-efficient practices across the site.
• Enhance interpretation and promotion of New Lanark’s hydroelectric heritage and
renewable energy use to engage and educate visitors.
• Work with environmental partners to support biodiversity, conservation, and the
integration of natural and cultural heritage values.
3. Site-wide events
3.1 Core offer
• Develop a quarterly calendar of events featuring a consistent core offer each season,
complemented by additional activities and one-off events throughout the year.
• Establish key themes for each season to guide programming, allowing the core offer
to be adapted and refreshed regularly.
• Promote the seasonal offer across all channels and ensure staff, volunteers, visitors,
and partners are informed and aligned.
• Design all events and activities to reflect the site’s core values, ensuring they
contribute meaningfully to the visitor experience and support long-term goals.
3.2 Heritage & events programming
• Grow income-generating events that enhance the visitor experience, such as
exhibitions and interactive installations.
• Establish a structured programme of seasonal and special events, adaptable to
various formats and audiences.
• Use data and research to inform creative and practical use of onsite facilities, such
as hosting public and private screenings in the film theatre to diversify income
streams.
• Build strategic partnerships with tourism organisations to boost event visibility and
attendance. 
4. Trading businesses
4.1 Management and finance
• Maintain ethical decision-making and robust corporate governance, ensuring that all
activities contribute to the charitable aims of the Trust.
171

Page 172

19 
• Regularly review policy and structures to ensure trustees and relevant boards remain
fit for purpose and support prospective funding projects. 
4.2 Hotel and business collaboration
• Strengthening cross-site collaboration to ensure the hotel and other businesses-
including accommodation, leisure, and hospitality- are fully utilised, contributing to the
overall sustainability of New Lanark.
• Develop collaborative marketing strategies that integrate hotel occupancy with
events, conferences, and seasonal programming to encourage longer visitor stays.
• Focus on corporate and group partnerships to maximise room hire and event space
usage, particularly during off-peak periods. 
4.3 Café and visitor services
• Implement cross-site marketing strategies to maximise café footfall, integrating visitor
services with onsite events to enhance the visitor experience and profitability.
• Develop themed dining experiences or historical tie-ins that encourage longer visits,
positioning the café and onsite shops as essential parts of the overall visitor journey. 
5. Organisational culture
5.1 Collaborative working
• Ensure that practices across the Trust, at every level, consistently reflect and are
guided by our core values: authenticity, responsibility, industriousness, and ambition.
• Encourage open dialogue and shared learning, ensuring staff and volunteers are
aligned with New Lanark’s vision and strategic goals.
• Engage with recognition and incentive schemes to motivate staff and volunteers,
contributing to a positive work environment. 
5.2 Strengthening workforce development
• Continue to actively embed fair working practices across the Trust as part of routine
policy review. 
• Enhance staff development through structured training, upskilling, and retention
strategies, ensuring a supportive and sustainable working environment.
• Maintain robust recruitment and selection procedures that create pathways for
personal and professional growth.
172

Page 173

20 
Chapter 4: Managing the World Heritage Site 
I. The State Party 
State Parties are countries which have ratified the UNESCO World Heritage Convention.
Since International Treaties are reserved under the Scotland Act 1998 the UK government is
State Party to the Convention. The Department of Culture, Media and Sport (DCMS) is
responsible for the UK’s overall policy on WHSs but since management of the historic
environment is devolved, Scottish Ministers are responsible for selecting Scottish sites for
nomination, for ensuring that World Heritage Sites in Scotland are well managed, and that
the Outstanding Universal Value of each World Heritage Site is protected.   
II. The World Heritage Site Partnership Group 
The World Heritage Site Partnership Group for New Lanark is responsible for co-ordinating
other partners and stakeholders to deliver the Action Plan. At present, the partnership group
comprises the New Lanark Trust, Historic Environment Scotland and South Lanarkshire
Council. The current composition of the Partnership Group includes:
New Lanark Trust: As the custodian of the New Lanark site, the Trust oversees the
day-to-day management, conservation, and public engagement efforts. It is
instrumental in implementing the strategic vision for New Lanark, ensuring that the
site's heritage is both preserved and accessible.
Historic Environment Scotland (HES): As the lead public body responsible for
Scotland's historic environment, HES provides invaluable expertise, support, and
funding for conservation activities and learning and engagement. HES's involvement
is crucial in maintaining the site's physical integrity and promoting best practices in
heritage conservation.
South Lanarkshire Council: The local authority plays a significant role in supporting
the site's management, particularly in areas related to planning, local infrastructure,
and community engagement. The Council's involvement ensures that the World
Heritage Site's needs are integrated into broader local planning and development
strategies.
The Partnership Group's collaborative approach facilitates a comprehensive management
strategy that addresses both the preservation of the site's cultural and natural heritage and
its sustainable integration into the wider community. Through regular meetings and
coordinated efforts, the Group ensures that New Lanark World Heritage Site continues to
thrive and the OUV is protected. 
III. The stakeholders 
Effective stewardship of the New Lanark World Heritage Site is enriched by the active
involvement of diverse stakeholders, each contributing unique perspectives and resources.
Their collaboration ensures the site remains vibrant, accessible, and well-preserved.
a. Local Community and residents
The local community is central to New Lanark’s living heritage, with residents’ daily lives
closely tied to the site's cultural and historical identity. Ongoing engagement through
173

Page 174

21 
consultation, partnership, and education helps ensure the site’s development reflects shared
values and remains relevant to contemporary life.
New Lanark currently includes 27 owner-occupied homes and 45 rental properties, with
residents from diverse demographic and socio-economic backgrounds. The Trust is
accredited by Landlord Accreditation Scotland (LAS) and adheres to its standards, ensuring
high-quality tenancy management and strong resident support. 
b. Landowners
The stewardship of New Lanark’s natural and architectural heritage relies heavily on its
landowners. By working closely with the management team, landowners help conserve the
site’s unique landscape and historic buildings, aligning private responsibilities with the
collective goal of preserving its Outstanding Universal Value (OUV).
c. Business and economic partners
As a globally recognised heritage site, New Lanark contributes significantly to the economy
through tourism, hospitality, and cultural activities. Business partners play a crucial role in its
sustainable development, enhancing visitor experiences while supporting infrastructure and
services that ensure economic vitality.
d. Educational institutions
New Lanark serves as an invaluable educational resource, engaging schools, universities,
and other institutions. These collaborations support learning about industrial history, social
reform, and renewable energy. By linking the site’s heritage to contemporary themes, these
partnerships enrich educational opportunities and broaden its relevance.
e. Conservation and heritage organisations
The preservation of New Lanark benefits greatly from the expertise and support of
conservation and heritage bodies. These organisations provide technical advice, funding,
and research, aiding efforts to safeguard the site’s buildings, machinery, and landscapes.
Their advocacy elevates New Lanark’s profile, ensuring its heritage resonates globally.
f. Visitors
Visitors are vital to New Lanark’s ongoing success, bringing fresh perspectives and insights.
By tailoring services to meet their diverse needs, the site allows for greater appreciation of
its history and values while promoting cultural and natural conservation on a global scale. 
IV. Planning and public policy considerations 
In ensuring the safeguarding and enhancement of the New Lanark World Heritage Site, the
interplay of planning and public policy plays a pivotal role. These frameworks not only guide
the preservation efforts but also shape the developmental trajectory of the site, ensuring that
its Outstanding Universal Value (OUV) is upheld. This section outlines the critical aspects of
planning and public policy that bear upon the management of New Lanark.
a. Planning frameworks and legislation
The United Kingdom's adherence to the World Heritage Convention is manifested through a
robust planning framework that recognises the unique status of World Heritage Sites. In
Scotland, this framework is integrated into national planning policies, which afford a
protective overlay to sites of such distinguished heritage value. New Lanark, positioned
within this framework, benefits from specific planning considerations that aim to preserve its
historical integrity and natural beauty. Local planning policies, formulated by South
174

Page 175

22 
Lanarkshire Council, serve as the operational guidelines for managing the New Lanark site.
These policies, reflective of both national heritage priorities and local aspirations, seek to
balance conservation needs with sustainable development objectives. The planning
frameworks and legislative documents are instrumental in evaluating and guiding proposed
changes or interventions within the site and its buffer zone, ensuring that these are in
harmony with the site's OUV.
b. Protection and enhancement
The statutory protection afforded to New Lanark through its listing as a World Heritage Site
is complemented by national and local heritage policies. These policies, while providing a
framework for physical conservation, also emphasise the site's living heritage, where the
social, economic, and cultural dimensions of sustainability are interwoven with conservation
strategies. Historic Environment Scotland, as the principal advisory body on heritage matters
in Scotland, plays a critical role in this context. Its guidance on conservation principles and
practices informs the management strategies for New Lanark, ensuring that any
conservation work or development within the site maintains the highest standards of heritage
integrity.
c. Community and stakeholder engagement
Integral to the planning and policy considerations is the active engagement of the community
and stakeholders. This engagement ensures that the management of New Lanark reflects a
broad consensus, respecting the site's heritage while accommodating contemporary needs
and aspirations. Public consultations, stakeholder meetings, and collaborative planning
exercises form the bedrock of a participatory approach to heritage management, building a
shared sense of ownership and responsibility towards the site.
d. Sustainable development and heritage conservation
The intersection of sustainable development principles with heritage conservation objectives
is a key policy consideration for New Lanark. This approach recognises the need for the site
to evolve as a dynamic cultural landscape that contributes to local and national well-being.
Sustainable tourism, economic revitalisation through heritage-led regeneration, and the
promotion of cultural and educational activities are pursued within a framework that ensures
the long-term preservation of the site's OUV.
In navigating the complex interplay of planning and public policy, the management of the
New Lanark World Heritage Site remains committed to a holistic vision. This vision not only
seeks to safeguard the site's physical and cultural heritage but also to harness its potential
as a catalyst for sustainable development and community enrichment. Through diligent
adherence to planning frameworks and active engagement with policy processes, New
Lanark continues to evolve as a model of integrated heritage management, reflecting the
enduring values and aspirations that have shaped its legacy.
175

Page 176

23 
Chapter 5: Implementation strategy for the Management Plan 
I. The Action Plan 
For the realisation of the New Lanark World Heritage Site's strategic objectives for the period
2025-2030, an Action Plan has been developed. This plan serves as the blueprint for all
activities and projects aimed at preserving the site's Outstanding Universal Value (OUV),
enhancing visitor experiences, and ensuring sustainable development within the site's
bounds.
The Action Plan is structured around the strategic objectives outlined in Chapter 3, with each
objective breaking down into specific, actionable steps. These steps are designed to address
the various aspects of the site's management, conservation, and development. This
encompasses a broad range of focus areas, including but not limited to, conservation and
restoration projects, educational programming, community engagement initiatives, and
sustainable tourism development. Each area is tailored to contribute towards the overarching
aim of enhancing the site's value for present and future generations.
The Action Plan has been developed in consultation with local communities, heritage
organisations, academic institutions, and government bodies. A robust monitoring and
evaluation framework will facilitate regular reviews of progress against stated objectives,
allowing for adjustments and refinements to be made as necessary. Performance indicators
and milestones will be established for each action, providing clear criteria for assessing
achievements and areas requiring further attention.
Efforts will be directed towards identifying and accessing diverse funding streams, including
government grants, private donations, and partnership opportunities. The Trust will seek to
support the site's ongoing financial sustainability, without compromising its Outstanding
Universal Value. Raising awareness about New Lanark's heritage, its significance, and the
ongoing efforts to preserve it is essential for building public support and encouraging active
participation in the site's programmes and initiatives. 
II. Implementation considerations 
To effectively implement the 2025-2030 Management Plan for New Lanark World Heritage
Site, several key factors must be addressed to ensure its sustainability and impact. The Plan
will navigate the complexities of heritage conservation and ensure that New Lanark’s
Outstanding Universal Value is safeguarded. Through collaboration, adaptability, capacity
building, financial sustainability, and effective communication, we aim to preserve New
Lanark as a vibrant example of our shared heritage.
The success of the Management Plan depends on balancing conservation efforts with
community engagement, education, and sustainable development. By integrating heritage
preservation with socio-economic growth, we ensure a balanced stewardship that respects
the site’s past while planning for its future. It is essential to involve a diverse range of
stakeholders, from local residents and businesses to heritage professionals and government
176

Page 177

24 
agencies. Given the evolving nature of heritage sites, the Management Plan adopts an
adaptive approach, allowing flexibility to respond to new challenges, opportunities, and
insights. Regular monitoring and revisions will ensure the plan remains relevant and effective
over time.
The successful implementation of the plan relies on developing the skills and knowledge of
those managing the site, alongside building broader community understanding and
appreciation of its heritage. Training, educational programmes, and volunteer involvement
will help build capacity across all levels. A diversified funding strategy- encompassing
government support, grants, philanthropy, and revenue-generating activities- will ensure
long-term financial sustainability while aligning with the site’s heritage and educational goals.
Effective communication is crucial for raising awareness about New Lanark’s heritage and
conservation efforts. A comprehensive strategy will engage audiences through media, public
events, and educational programmes, building a shared responsibility for the site’s future. 
III. Monitoring and reporting 
For the New Lanark World Heritage Site Management Plan 2025-2030 to achieve its set
objectives, a monitoring and reporting system is essential. This system ensures continuous
evaluation of progress, enabling adjustments as needed to meet the plan’s objectives.
Monitoring and reporting provide the means to assess the effectiveness of management
strategies and communicate results to all stakeholders.
The foundation of our approach is the establishment of a continuous monitoring system that
examines the execution of the action plan and its outcomes against the established
benchmarks. Regular data collection will focus on indicators such as the site’s conservation
status, visitor experience, community engagement, and the impact of educational initiatives.
This systematic approach enables informed decision-making to ensure strategies are
delivering the desired outcomes, with course corrections implemented where necessary.
Monitoring will actively involve a broad range of stakeholders, including local residents,
heritage professionals, educational institutions, and volunteers. Engaging these groups in
the process builds shared responsibility and strengthens commitment to the site’s
preservation.
To ensure transparency and accountability, regular reports will be produced detailing the
progress towards strategic objectives, successes, and areas needing improvement. These
reports will document actions taken, resources used, and outcomes achieved, providing
stakeholders- such as funding bodies, government agencies, and the local community- with
clear and accessible information on the plan’s implementation. Making the content of these
reports publicly accessible will ensure that all interested parties, from local residents to
heritage enthusiasts, can review the site’s management efforts and outcomes. Public access
will also invite feedback and suggestions for improvement, building an open, collaborative
environment that encourages contributions from the wider community. Feedback from
stakeholders, annual reports, and public consultations will be analysed to refine and
enhance the Management Plan. This adaptive approach ensures the plan remains flexible
and responsive to new challenges and opportunities. 
177

Page 178

25 
178

Page 179

26 
Appendices 
Appendix 1: Key documents for the Management Plan 
Policy area  Main requirements of the
plan 
How it affects or is affected by
the New Lanark WHS
Management Plan 
UNESCO World
Heritage Convention
1972 
Provides for the identification,
protection, conservation and
presentation of cultural and
natural sites of outstanding
universal value. 
The requirements of the
Convention will be fully met within
the Management Plan. 
European
Convention on the
Protection of
Archaeological
Heritage (Revised
1992) 
Aims to protect
archaeological heritage. It
describes archaeological
heritage as including
structures, constructions,
groups of buildings,
developed sites, moveable
objects, monuments of other
kinds as well as their context,
whether situated on land or
under water. 
The Management Plan will have
cognisance of the Convention in
its objectives and actions. 
United Nation’s
Sustainable
Development Goals
(2015) 
The Goals are a collection of
17 interlinked global goals
designed to be a ‘blueprint to
achieve a better and more
sustainable future for all’ The
aim of the goals is to end
poverty, protect the planet
and ensure prosperity for
everyone by 2030. 
The Management Plan will take
cognisance of the Sustainable
Development Goals. The SDGs
have been incorporated within the
Action Plan 
The Paris Agreement
UNFCCC, 2015 
International agreement to
reduce emissions to
contribute to the reduction of
greenhouse gas. It is also a
commitment to limit global
warming to less than 2oC and
to take action to minimise
climate change. 
The Management Plan will
contribute to the achievement of
national commitments at a local
level. 
179

Page 180

27 
United Nations
COP26 Glasgow  
The 2021 United Nations
Climate Change Conference
(COP26), held in Glasgow. 
The Management Plan will
contribute to the achievement of
global commitments at a local
level. 
European Landscape
Convention (2000) 
International treaty dedicated
to the protection,
management and planning of
all landscapes in Europe. 
The Management Plan will help
to safeguard landscapes by
influencing changes in land use
which can impact on the local
landscape and setting. 
Historic Environment
Policy for Scotland
(HES) 2019 
A policy statement directing
decision-making that affects
the historic environment. 
The Management Plan will take
cognisance of the importance of
the historic and built heritage of
the area. 
Our Past, Our
Future: The Historic
Environment
Strategy for Scotland
(2023) 
Sets out a national mission to
sustain and enhance the
benefits of Scotland’s historic
environment, for people and
communities now and into
the future. It replaces Our
Place in Time (2014). 
The Management Plan will
significantly contribute to the
sustainment of the rich historic
and cultural heritage within the
New Lanark World Heritage
Site.   
Pointing the Way to
the Future (HES)
(2023) 
HES’s climate and nature
crises statement. It
recognises that the historic
environment is part of a just
transition to net zero and that
the reuse of historic assets is
central to sustainable
development. 
The Management Plan will
contribute to the delivery of this
plan at a local level and within the
New Lanark World Heritage Site. 
The Climate Change
(Emissions
Reduction Targets)
(Scotland) Act 2019 
Sets targets to reduce
Scotland’s emissions of all
greenhouse gases to net-
zero by 2045 at the latest,
with interim targets for
reductions of at least 56% by
2020, 75% by 2030, 90% by
2040. 
The Management Plan will
ensure climate change mitigation
and adaptation is considered
within the actions and activities it
promotes. 
A Culture Strategy
for Scotland (2022) 
Prioritises and identifies
culture through place and
promotion of the historic built
environment. 
The Management Plan will
contribute to the delivery of this
Strategy at a local level. 
180

Page 181

28 
Climate Change Plan
2018 - 2032 
This is the third report on
proposals and policies. It sets
out the path to a low carbon
economy while helping to
deliver sustainable economic
growth and secure the wider
benefits to a greener, fairer
and healthier Scotland in
2032. 
The Management Plan will
contribute to delivering on the
policies and proposals set out in
the Plan at a local level.   
Planning (Scotland)
Act 2019 
Determines the future
structure of the planning
system. 
The Management Plan will take
cognisance of the Act’s
requirements. 
National Planning
Framework 4  
NPF4 sets out a new plan for
Scotland in 2050. It has a
focus on environmental
protection and placemaking. 
The Management Plan will take
cognisance of NPF4 and will
contribute to its delivery at a local
level. 
Heat in Buildings
Strategy 
Sets out the actions in the
building sector to deliver
national climate change
commitments, maximise
economic opportunities, and
ensure a just transition. This
includes helping to address
fuel poverty and reducing
greenhouse gas emissions
from homes and buildings. 
The Management Plan will take
cognisance of the Strategy and
will contribute to its delivery at a
local level, taking account of
challenges from retrofitting
renewable energies in historic
buildings. 
Scotland Outlook to
2030: Responsible
tourism for a
sustainable future
(2020) 
A collaborative vision that
‘Tourism can and will benefit
every person who lives in
Scotland, visits Scotland and
works in Scotland’. 
The Management Plan will
promote and support responsible
and sustainable tourism in New
Lanark and its environs. 
Glasgow City
Region’s Climate
Adaptation Strategy
and Action Plan 2020
- 2030 
Aims to ensure the Region’s
economy, society and
environment is not only
prepared for but continues to
flourish in the face of the
impacts arising from the
climate crisis. 
The Management Plan will have
cognisance of the strategy. 
Flood Risk
Management
Strategy – Clyde and
Published by SEPA, the
strategies set out actions to
manage flood risk and the
impact of flooding in high-risk
The Management Plan will have
cognisance of these strategies to
reduce flood risk and the impact
of flooding within New Lanark. 
181

Page 182

29 
Loch Lomond:
Tweed 2022 - 2028 
areas, within specific flood
risk management districts. 
Local Flood Risk
Management Plans –
Clyde and Loch
Lomond: Tweed
2022 - 2028 
Provides additional local
detail on the funding and
delivery timetable for the
objectives and actions set out
in the relevant Flood Risk
Management Strategies. 
The Management Plan will take
cognisance of these to reduce
flood risk and the impact of
flooding within New Lanark. 
Clydeplan - Forestry
and Woodland
Strategy 
Replaces the Glasgow and
the Clyde Valley Forestry and
Woodland Strategy. It informs
the location, design and
management of woodlands
within the Clydeplan area. 
The Management Plan will
support the delivery of the
Strategy by promoting the
importance of trees to people, the
local community and the history
of the World Heritage Site. 
Clyde Climate
Forest 
This is a project of the Green
Network Blueprint and is part
of the Strategic Habitat
Network. 18 million trees will
be planted in both urban and
rural Glasgow City Region
over the next decade. 
The Management Plan will
consider how it can take local
action to contribute to the delivery
of this project. 
Clyde Mission  Purpose is to use the River
Clyde to drive sustainable
and inclusive growth for the
city, the region and Scotland.
It aims to harness the
opportunities and competitive
advantage of the River Clyde
and the surrounding assets
to deliver economic, social
and environmental benefits. 
The Management Plan will take
local actions to contribute to the
delivery of the Clyde Mission
Goals. 
Clyde Mission:
Energy Masterplan 
Supports the strategic
development of low carbon
heat and energy
infrastructure projects that
align to the goals of the
Clyde Mission. It aims to
support the identification and
development of a portfolio of
heat and energy related
investment opportunities
within the area. 
The Management Plan will
contribute to the delivery of the
Clyde Mission Goals at a local
level. 
Local Development
Plan 2 and
Promotes the continued
growth and regeneration of
The Management Plan will take
cognisance of the Plan within its
182

Page 183

30 
associated
Supporting Planning
Guidance, 2021 –
2026 
South Lanarkshire, whilst at
the same time protecting and
enhancing the environment.
It aims to guide future
developments and to improve
the quality of life for everyone
in South Lanarkshire. 
actions. Actions within the
Management Plan that require
planning consent must comply
with the Local Development
Plan. 
New Lanark
Conservation Area
Appraisal 
Informs our understanding of
critical elements requiring our
attention to ensure
appropriate conservation and
development at New Lanark
and its environs. It
demonstrates the sensitivity,
attention to detail, and
understanding required from
all participating stakeholders.
Actions within the Management
Plan will take cognisance of the
Appraisal to ensure the integrity
of the Conservation Area status.
It is a material consideration in
planning decisions within New
Lanark. 
Tourism Strategy  
2022 - 2025 
The vision of the plan is to
cultivate a vibrant, successful
visitor economy in South
Lanarkshire which promotes
responsible growth and
creates jobs and
opportunities for communities
throughout the region.
The Management Plan will take
cognisance of the Plan within its
actions. 
South Lanarkshire
Leisure and Culture
Strategy 2022 -
2027 
Designed to target the things
that matter to the people of
South Lanarkshire, supported
by evidence and informed by
good practice. It
complements the work of the
SLC Council Plan and
Community Plan.
The Management Plan
contributes to the delivery of the
Strategy at a local level. 
Vision for Lanark
2020 – 2030 (Lanark
Community
Development Trust)  
The Vision is an ambitious
10-year strategy which aims
to make the most of Lanark’s
extensive assets for
residents, visitors and local
businesses alike. Drawing
upon the potential of our
unique cultural and natural
heritage, Lanark and its
environs will be a greener,
The Management Plan will
contribute to the delivery of the
Strategy within New Lanark and
will accord with its aims. 
183

Page 184

31 
more prosperous place to
live, work and visit.
Local Heat and
Energy Efficiency
Strategy 2024 -
2028 
Long-term strategic
framework for decarbonising
heat in buildings and
improving energy efficiency
across South Lanarkshire.
The Management Plan will take
cognisance of requirements to
decarbonise heat in buildings
within New Lanark and improve
their energy efficiency. 
Appendix 2: Strategic Environmental Assessment (SEA)
In Scotland, public bodies are required to assess, consult on, and monitor the likely impacts
their plans, programmes and strategies will have on the environment. This process is known
as Strategic Environmental Assessment (SEA). South Lanarkshire Council conducted the
SEA on behalf of the New Lanark World Heritage Partnership Group (New Lanark Trust,
South Lanarkshire Council and Historic Environment Scotland), which will cover the period
2025 – 2030. 
The SEA found that an overall assessment of the Management Plan has identified the
potential for positive cumulative effects across its objectives for the historic and cultural
heritage of New Lanark WHS.  The Management Plan will offer and support opportunities to
promote the importance of local heritage assets and protect them for future generations.
The following key measures were identified:
• Ensure that the promotion of local historic and cultural assets to communities and
tourists is carried out sensitively to avoid adverse impacts which may be detrimental
to the integrity of the Site and its amenity.
• Consider how the Management Plan can align with partner organisations’ plans and
strategies to ensure a shared and consistent approach to environmental
stewardship.  
• Strengthen the use of volunteering to increase awareness and understanding and
provide additional safeguarding by the Third Sector and communities. 
• Opportunity to promote the interconnections between the climate and nature
emergencies and how these impact on New Lanark and its setting. 
184

Page 185

Report
Agenda Item 
Report to: Community and Enterprise Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Response to Commercial Waste Motion 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an overview of the current arrangements for commercial waste collection
in South Lanarkshire, including a summary of the relevant legal framework
 outline the legal, practical and resource implications associated with implementing
and enforcing a new policy that limits the times when commercial premises can
present their waste for collection
 outline the requirements for consultation and the associated resourcing
implications
[1purpose]
2. Recommendation(s)
2.1. The committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be noted;
(2) that the legal framework and challenges underpinning a Commercial Waste
Policy be noted;
(3) that the operational implications and enforcement options of such a policy be
noted;
(4) to note that the costs of developing, implementing and enforcing a Commercial
Waste Policy would be an estimated £0.320 million per annum; and
(5) that a policy not be pursued and instead, an enhanced programme of activity to
promote best practice in waste management and collection for commercial
businesses be developed and implemented within the context of the Council’s
statutory functions for environmental regulation, compliance and enforcement. 
3. Background 
3.1. At its meeting on 20 November 2024, the Council unanimously approved a motion
instructing officers to investigate the existing commercial waste management
arrangements in South Lanarkshire and explore options for a new system. 
3.2. The motion highlighted the negative impact of litter and overflowing commercial waste
bins, particularly in town centres and areas with high footfall, where the storage and
presentation of commercial waste is viewed as contributing to a run-down and
uninviting streetscape. In particular, concerns have been raised about the permanent
storage of waste receptacles on footpaths and the timing of commercial refuse
collections, which are considered to have a cumulative negative impact on the amenity
and environmental quality of local areas.  
12
185

Page 186

3.3. The motion requested that officers explore a range of specific options, including: 
 options and implications of a system of allocated time slots for commercial waste
to minimise the time waste is placed on streets
 proposals for consulting with businesses and waste service providers on any new
arrangements
 options and implications of supporting businesses to adjust to any changes
 options and implications of compliance, including the use of Fixed Penalty Notices 
3.4. This report provides a high-level response to the request and seeks approval for the
proposed approach and for the associated resources required to support the next
phase of the project. 
4. Current Arrangements for Commercial Waste Collection
4.1.  The legal framework relating to the collection, disposal and treatment of commercial
waste can be found within Part II of the Environmental Protection Act (the ‘EPA’) 1990. 
The EPA outlines the obligations on businesses to protect the environment, as well as
setting out enforcement process and penalties for non-compliance. 
4.2.  Section 34 of the EPA assigns a ‘duty of care’ on businesses to manage waste
responsibly, including ensuring appropriate collection, storage, and disposal
arrangements. It also requires businesses to maintain proper paperwork (in the form
of Duty of Care Certificates or Waste Transfer Notes) for a period of 2 years. 
4.3. The Waste (Scotland) Act 2012 amended the EPA to make it mandatory for business
to present recyclable waste (and in some cases, food waste) separately. In practice,
this means that businesses, such as food premises, will need a minimum of 3 bins to
comply with legal requirements. The regulations also have implications for collection
companies, who either have to purchase specialist ‘split-bodied’ vehicles or put
multiple refuse collection vehicles on a route. 
4.4. Areas that are considered to be most impacted by the visible presence of commercial
bins, tend to be high density areas featuring tenement buildings. These properties
were built in the late 19th and early 20th century when the refuse storage requirements
were minimal. Commercial premises commonly occupy the ground floor of tenement
buildings and do not always have access to back court areas, which are generally
reserved for domestic occupants residing in the upper floors. Food premises, which
often operate outwith normal working hours, make up a significant proportion of
businesses based in these areas. 
4.5. Food premises are subject to stringent food hygiene requirements which prohibit the
internal storage of waste. Any policy that prohibited the storage of bins on footpaths is
likely to have a disproportionate impact on food premises operating from traditional
buildings such as tenements. 
4.6. South Lanarkshire Council does not provide a commercial waste collection service,
however, there are several licenced waste collection companies operating in the area.
Businesses are free to choose who they contract their refuse collection services to,
with the cost likely being the most important factor in their decision. 
186

Page 187

5. Enforcement Options
5.1. The key enforcement provisions relevant to this report are set out in Sections 5.1.1 to
5.1.3 below. 
5.1.1. Section 34 of the EPA 1990 places a duty of care on businesses to manage waste
responsibly, including ensuring appropriate collection, storage, and disposal
arrangements. 
5.1.2. Section 47 of the EPA 1990 provides waste collection authorities with the power to
specify the type, number, and location of receptacles, and to stipulate when bins may
be presented and when they must be removed. 
5.1.3. Section 59 of the Roads (Scotland) Act 1984 prohibits the placing or depositing of
items that cause an obstruction on public roads (including footways and verges),
unless written consent is granted by the Roads Authority. While this legislation is
occasionally referenced in local policies elsewhere in Scotland, its practical application
to commercial waste is limited, particularly in town centres where wide footways often
mean that bins do not cause a physical obstruction. 
5.2. In terms of enforcing the provisions referenced above, there is no current legislative
provision enabling the Council to issue fixed penalty notices to commercial premises
that store waste receptacles on public footpaths although it is noted that legal
provisions may be enacted later in the year which will provide council’s with additional
powers to issue penalties and this is an activity which will be pursued when the
legislation is in place. 
5.3. Formal notices can be issued under Section 47 of the EPA 1990, however, currently
the only legal recourse for non-compliance with a formal notice, would be to refer the
matter to the Procurator Fiscal. It would then be for the Procurator Fiscal to decide,
based on public interest, whether the offence warranted prosecution in the Sherrif
Court. This has proved extremely challenging in other council areas who have enacted
a commercial waste policy. 
6.  South Lanarkshire Council’s Approach to Enforcement
6.1. The Council’s Enforcement Policy requires that enforcement action must be fair and
proportionate. The commitment to fairness and proportionality would need to be taken
into consideration when designing a new policy. The policy would need to be clearly
communicated to businesses and appropriate support would need to be provided. 
6.2. The introduction of a regulated commercial waste policy would represent a significant
operational change for local businesses and their waste contractors. Early and
sustained engagement will be critical to the success of any revised approach,
particularly where businesses are being asked to change long-standing practices or
incur additional operational costs. 
6.3. Should the Council wish to progress with the introduction of a formal policy on
commercial waste presentation, it is proposed that a ‘4E’s approach is adopted i.e.
Engage, Educate, Encourage and Enforce. This would include clear messaging,
individual engagement with affected businesses, tailored advice, and proportionate
compliance monitoring. This approach would align with the Council’s existing
Enforcement Policy.  
187

Page 188

6.4. In this respect Environmental Services and a range of other Services within
Community and Enterprise Resources engage with businesses on a daily basis and
as such this provides an opportunity to promote good practice or to highlight issues of
poor waste management at an early stage. 
6.5 Officers from across the Service will be encouraged and informed to work with
businesses to highlight the adverse impact of poor waste management arrangements.
At the same time they can engage with colleagues in Roads Services and
Regeneration to identify practical measures that could be taken to address the impact
of waste infrastructure that is inappropriately sited. 
6.6 This positive and proactive approach to engagement is in line with the existing Council
policy on enforcement but as a further recourse would also provide sufficient evidence
for officers to expedite the enforcement processes should businesses be unwilling to
co-operate or take reparative action. 
7.  Policy Implications
7.1. If the development of a policy is progressed, Section 47 of the EPA would be utilised
to develop a policy that allows businesses only to leave bins on public areas (including
footpaths) at designated times. 
7.2. The policy would need to recognise that some businesses, due to space and access
restrictions, would not be able to comply with the policy (Section 4.4 and 4.5). These
businesses would require an exemption from the policy. To facilitate this process,
exemption assessments would need to be undertaken prior to the policy
implementation date. Given the geography of many of South Lanarkshire’s town
centres, it is expected that many businesses would qualify for an exemption.   
7.3. Extensive consultation will be required with local businesses and waste management
companies prior to implementing the policy. This work will need to take place during
extended hours, including evenings and weekends, to reflect business opening hours.
Exemption assessments (referred to in Section 7.2) would also be managed at this
stage. 
7.4. Once the consultation stage is complete, a policy would be developed which sets out
the designated times when bins can be presented for collection. The policy will also
confirm what sanctions will be used for non-compliance. A report, detailing the
outcome of the consultation process and the content of the policy, would require formal
approval at a future Council Committee. 
7.5. Once the policy is approved and implemented, businesses who do not comply, and
have not been granted an exemption, would be subject to a formal notice under
Section 47 of the EPA.  As stated in Section 5.3 of this report, businesses who do not
comply with the formal notice would be referred to the Procurator Fiscal. 
7.6. There will be on-going requirement to monitor and enforce compliance. Again, this will
need to be carried out during extended hours and weekends.   
7.7. Given the requirement for extensive consultation and the need to provide support to
businesses, Environmental Services will require additional resources. Indicative
additional costs are estimated at £0.320 million per annum to provide 5 additional
Enforcement Officers operating over a shift pattern. 
188

Page 189

7.8 It should be noted that there is currently no additional revenue budget to deliver this
piece of work. 
7.9. Given the challenges outlined in Sections 5.3 and 7.2, implementing a commercial
waste policy that achieved the intended outcomes of the Motion would prove extremely
difficult. With the additional resources required to develop and then implement the
policy, it is unclear whether this would deliver Best Value for the Council. For these
reasons, it is recommended that a policy is not pursued. In its place an enhanced
programme of activity to promote best practice in waste management and collection
for commercial businesses could be developed and implemented within the context of
the Council’s existing statutory functions for environmental regulation, compliance and
enforcement. 
8. Employee Implications
8.1. If the development of a Commercial Waste Policy is to be progressed, there would be
a requirement for additional 5 FTE Enforcement Officers. The officers would be
required to work a shift pattern that included evenings and weekends, which attracts
a shift allowance of 4 increments. 
Post Title Proposed
No of
Posts
Grade/
Level
SCP
Range
Hourly
Rate
Annual
Pay
Total
Annual
Cost
(including
on costs) 
Enforcement
Officer
5 Grade 3
Level 2
(plus 4) 
79-80 £26.67-
£27.07
£48,670-
£49,400
£63,125-
£64,071     
Total £315,625
–
£320,355 
9. Financial Implications
9.1. The development, implementation and enforcement of a Commercial Waste Policy
would require additional revenue funding of £0.320 million per annum. There is
currently no budget available for this. If the structure was to be recommended, the
Community and Enterprise Resources Committee would not be able to agree this as
it would be outwith its own existing budget resource.  Such a decision would require
to be made by the Executive Committee or through budget considerations. 
10. Climate Change, Sustainability and Environmental Implications 
10.1.  Improvements to the current commercial waste management arrangements have
potential to reduce the presence of litter in local communities and improve the general
amenity of the area. 
11. Other Implications
11.1. There will be implications for businesses in South Lanarkshire who will be required to
change their current practices and potentially change their waste management
providers. It is worth noting that some businesses may be tied into contractual
arrangements with their current provider. 
11.2. An exemption process will be required for businesses who do not have access to
refuse storage areas (e.g. tenements). This may mitigate the benefits associated with
introducing a policy in some areas.   
189

Page 190

12. Integrated Impact Assessment and Consultation Requirements
12.1. Extensive consultation would be undertaken with local businesses prior to a formal
policy being implemented, as noted above. An Integrated Impact Assessment would
also be undertaken to inform the development of such a policy. 
David Booth
Executive Director (Community and Enterprise Resources) 
22 September 2025 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Accountable, effective, efficient and transparent 
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
Notice of Motion - Exploration of a New Waste Management System, South Lanarkshire
Council, 24 November 2024. 
List of Background Papers
 None  
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact: 
Kevin Carr, Head of Facilities, Waste and Grounds
Ext: 4708
E-mail: Kevin.Carr@southlanarkshire.gov.uk 
190

Page 191

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: South Lanarkshire Inward Investment and Property
Enquiries Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on work being undertaken to develop the Council’s approach to
Inward Investment and review the range of enquiries received for business and
industrial space within South Lanarkshire from January to August 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the progress on the Council’s approach to Inward Investment be noted; and
(2) that the range and number of enquiries for business space in the South
Lanarkshire area be noted.
[1recs]
3. Background
3.1. Inward investment makes a distinct, positive and significant impact on our economy at
both a national, regional and local level.  The term ‘Inward Investment’ describes both
foreign direct investment (FDI) and similar investment from the rest of the UK into
Scotland, the Glasgow City Region and our local authority area. 
3.2. Scotland’s Inward Investment Plan: Shaping Scotland’s Economy sets out the national
approach to targeting and attracting Inward Investment. Scottish Development
International (SDI) (part of Scottish Enterprise) engage with major businesses and
investors from around the world to encourage them to do business in or with Scotland. 
The Council continues to strengthen its relationship with SDI representatives and tap
into the Inward Investment opportunities they can provide. 
4. South Lanarkshire Inward Investment Strategy
4.1. The Strategy consists of five workstreams:- 
 establishment of a cross resource in-house team to drive forward investment in
South Lanarkshire
 creation of a cross-resource property enquiry database to track enquiries which
can be monitored and analysed
 development of a stand-alone South Lanarkshire Inward Investment website to
promote Council and key stakeholder sites  
13
191

Page 192

 development of a South Lanarkshire Inward Investment proposition document or
‘pitch book’
 foster closer relationships with SDI, Scottish Enterprise (SE), property agents,
developers and investors 
4.2. Significant progress has been made across these five workstreams  including:- 
 a cross-resource in-house team of officers from Enterprise and Sustainable
Development Services, Housing and Technical Property Services and Corporate
Communications now meet regularly to collaborate, develop our approach to
inward investment and identify opportunities
 a co-ordinated property enquiries database has now been created and is
monitored and analysed on a quarterly database to try and align with the
requirements of occupiers and business seeking to expand or locate into our area
 a stand-alone South Lanarkshire Inward Investment website,
www.investsouthlanarkshire.co.uk, to promote Council and key stakeholder sites
has now been established with content being developed and added on a regular
basis
 engagement with City Region partners to raise the profile of the City Region
authorities, including South Lanarkshire, when opportunities arise to raise our
profile and engage with partners and potential investors on the national and
international stage
 continuing engagement with SDI, SE and the private sector to ensure we get the
opportunity to showcase our key development sites 
5. Property Enquiry Activity
5.1. As outlined above, property enquiries to the Council are now recorded through a single
database.  From January 2025 through to August 2025, 87 enquiries were received. 
A breakdown of these enquiries is attached in Appendix 1:- 
 more than 85% of enquiries were seeking business / industrial space of up to
10,000 sq, ft in size with very little availability of suitable premises within the
Council area
 the most sought-after business locations were Hamilton and East Kilbride
 nearly 20% of all enquiries were from Construction Trades and Engineering
businesses, with 13% from Food and Drink businesses.  Hair and Beauty,
Leisure and Sport and Retail and Wholesale businesses also made up a
significant proportion of enquiries
 inward Investment opportunities accounted for almost 7% of enquiries, existing
South Lanarkshire based companies accounted for almost 55% of the enquiries
received with business startup enquiries making up the balance of 38% 
5.2. Two sites owned by the Council - Langlands West, East Kilbride and Canderside,
Larkhall, have been the focus of strong interest from developers in the Data/AI and
Energy Production sectors, with the Langlands West site now under offer. 
6. Key Challenges
6.1. As previously reported to Committee, Enterprise and Sustainable Development
Service have previously commissioned commercial property consultants Ryden to
undertake a review of the commercial and industrial property supply across the South
Lanarkshire area.  This information has informed the Council’s understanding of
market capacity to satisfy requests from inward investors as well as assisting
expanding local companies to source suitable accommodation.  
192

Page 193

6.2. A number of issues constrain the ability of the area to satisfy inward investment
enquiries including:- 
 a lack of new industrial supply coming to the market
 vacancy rates are low and in some established industrial estates have no
available supply
 older premises are becoming obsolete and have poor energy performance
 there is limited refurbishment of existing stock taking place by private asset
management firms
 levels of industrial stock have fallen as a result of redevelopment of sites
 the supply of serviced development plots that would be attractive to inward
investors is critically low, which echoes the views of SDI and SE 
6.3. Whilst the creation of a South Lanarkshire inward investment offer is important to
accommodate new inward investment enquiries and meet the needs of expanding
indigenous companies, there needs to be a supply of development ready sites.  A
range of sites are available and are in the ownership of the Council or its partners
including Shawfield, Langlands West, Canderside and Caldwellside. The privately
owned site, Conexus at Poneil, is development ready and is already attracting
occupiers associated with renewable energy and battery storage.  The Council is also
bringing forward proposals for two industrial units at Cathcart Road in Rutherglen. 
7. Employee Implications
7.1. The development and implementation of Inward Investment and Property Enquiries
activity is being taken forward by officers within Enterprise and Sustainable
Development Service. 
8. Financial Implications
8.1. Activity is being met from existing revenue budgets. 
9. Climate Change, Sustainability and Environmental Implications
9.1. This project is being taken forward in line with the Council’s sustainability objectives. 
10. Other Implications
10.1. The risks associated with not supporting this activity is that South Lanarkshire will not
have a co-ordinated and effective presence when inward investment opportunities,
that will effectively grow the local economy, are on offer. The Council’s reputation may
be damaged if it does not proactively support and encourage inward investment in the
area. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, therefore, no Integrated Assessment
is required. 
11.2. Consultations have been co-ordinated by Economic and Sustainable Development
Services with a range of other Council services who have an ongoing role in Inward
Investment./Property Enquiries. This consultation and cooperation will continue
throughout the duration of the activity.  
193

Page 194

David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities /Outcomes
 Ambitious, self-aware and improving.
 Fair, open and sustainable.
 Working towards a sustainable future in a sustainable environment.
 Thriving business, fair jobs and vibrant town centres. 
Previous References
 South Lanarkshire Inward Investment Strategy, Community and Enterprise Resources
Committee 25 February 2025 
List of Background Papers
 www.investsouthlanarkshire.co.uk website 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: 
Iain Ross, Economic Development Manager
Tel: 07584703234
E-mail:  Iain.Ross@southlanarkshire.gov.uk 
194

Page 195

Jan-August 2025
Enquiries 81
Industry Agriculture, Forestry & Fishing 2
Animal Services 4
Charity 2
Child & Adult Care 2
Construction, Trades & Engineering 15
Clothing, Fashion & Textiles 1
Creative Industries 1
Domestic Services 3
Energy & Environment 2
Financial & Business Services 2
Food & Drink 11
Hair & Beauty Services 8
Horticultural Services 2
Hospitality, catering & event management 1
Health & Wellbeing 4
Industrial & Manufacturing 3
Leisure & Sport 7
Retail & Wholesale 7
Transport & Storage 4
Vehicle & Motor Trade 4
Other 2
Total 87
Size 0-10,000 sq ft 75
10-20, 000 sq ft 4
20-50,000 sq ft 6
over 50,000 sq ft 2
Total 87
Area Biggar 2
Blantyre 3
Bothwell 5
Cambuslang 4
Carluke 2
East Kilbride 15
Hamilton 19
Larkhall 6
Lanark 4
Other (outwith SL) 20
Rutherglen 5
Strathaven 2
Total 87
Business Start Up 33
Existing Lanarkshire Company 48
Inward Investment 6
Total 87
0
2
4
6
8
10
12
14
16
Industry Industry Agriculture, Forestry & Fishing
Animal Services
Charity
Child & Adult Care
Construction, Trades & Engineering
Clothing, Fashion & Textiles
Creative Industries
Domestic Services
Energy & Environment
Financial & Business Services
Food & Drink
Hair & Beauty Services
Horticultural Services
Hospitality, catering & event management
Health & Wellbeing
Industrial & Manufacturing
Leisure & Sport
Retail & Wholesale
Transport & Storage
Vehicle & Motor Trade
Other
0
10
20
30
40
50
60
70
80
0-10,000 sq ft 10-20, 000 sq ft 20-50,000 sq ft over 50,000 sq ft
Size Size
0-10,000 sq ft
10-20, 000 sq ft
20-50,000 sq ft
over 50,000 sq ft
0
2
4
6
8
10
12
14
16
18
20
Area Area
Biggar
Blantyre
Bothwell
Cambuslang
Carluke
East Kilbride
Hamilton
Larkhall
Lanark
Other (outwith SL)
Rutherglen
Strathaven
0
5
10
15
20
25
30
35
40
45
50
Business Start Up Existing Lanarkshire Company Inward Investment
Who the query is from Who the query is from
Business Start Up
Existing Lanarkshire Company
Inward Investment
13
195

Page 196

196

Page 197

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Garden Waste Permit Scheme - Progress Report 
1.   Purpose of Report
1.1.  The purpose of the report is to:- 
♦ provide an update to Committee on the introduction of the garden waste permit
scheme 
2.   Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted. 
3.   Background
3.1. As of 31 March 2024, approximately 110,000 domestic properties in South Lanarkshire
had been provided with a burgundy bin to collect co-mingled food and garden waste.
Around 5,000 properties with gardens (mainly in rural areas) did not have access to
the burgundy bin service at this time. 
3.2. On 26 June 2024, the Council’s Executive Committee approved a proposal (which had
been referred from Community and Enterprise Resources Committee for a decision)
to introduce a charge for the uplift of burgundy bins containing garden waste. The
proposal also allowed residents who had previously not had access to the burgundy
bin service, to purchase a permit. 
3.3. From 1 April 2025, residents who wished to dispose of garden waste in their burgundy
bin were required to purchase a permit for each bin used. Uptake of the permit scheme
was estimated at 30% in Year 1 (2025/2026) and reaching 50% in the second year.
The cost of each permit was priced at £45 and the net income from the scheme was
estimated at £0.585m in the first year. 
3.4. A dedicated project team was established to develop, implement and manage the
project, which went live on 19 February 2025. The project launch was promoted via
the Council’s website (including articles in the View) and social media platforms. In
addition, hangers advertising the new service, were attached to all burgundy bins
presented in the last two weeks of March 2025. 
14
197

Page 198

4. Progress to Date
4.1. As of 21 August 2025, over 39,700 permits have been purchased to date. This equates
to a current uptake rate of over 34.4% (based on the maximum estimate of 115,000
properties with gardens). This exceeds the original estimate of a 30% uptake in Year
1. Of this total, 257 permits have been issued to residents in areas that did not
previously have access to the burgundy bin service. 
4.2. Most permits were purchased in March and April 2025 (13,898 and 13,408
respectively). The breakdown of permits purchased (by month) is shown in the table
below.
Month Permits Issued  No of Permits
February 1,907
March 13,898
April 13,408
May 5,514
June 2,339
July 1,698
August (up to 21.8.25) 1,025 
4.3. Over 93% of permits were ordered via the new online customer portal. The remainder
(circa 2,640) were ordered via the dedicated telephone service managed by Waste
Services. 
4.4. In addition to requests for garden waste permits, Waste Services received 9,437
requests for new, replacement or larger burgundy bins between 19 February and 21
August 2025. This figure was higher than the original estimates (which were based on
the demand other local authorities who had introduced a similar permit scheme
reported) and is likely to be due to the fact that there was a significant number of small
(140L) burgundy bins still in circulation in South Lanarkshire as of 1 April 2025. 
4.5. In terms of the impact on waste tonnages and composition, there has been an increase
in the amount of residual waste (collected in the black bin) and a reduction in the
amount of organic waste (collected in the burgundy bin) from households in the first 4
months of the garden waste permitting scheme. Conversely, the amount of garden
waste collected at the Council’s six Household Waste and Recycling Centres has
increased slightly to 2,144 tonnes (an increase of approx. 100 tonnes) over the same
period. 
4.6. It should be noted that detailed waste modelling was carried out prior to the
implementation of the scheme and that the increase in residual waste tonnage is less
than the reasonable worst case scenario figure that was included in the financial
model. 
4.7. In terms of the most recent waste data reports, residual waste tonnages are now
reducing (and organic waste tonnages increasing) as residents order and receive their
permits. It is also worth noting that garden waste is seasonal, and both residual and
organic waste tonnages are likely to reduce when the growing season comes to an
end. Full annual waste tonnages are reported to SEPA at the end of 2025.    
198

Page 199

5.  Next Steps
5.1. Waste Services is currently working with the Council’s Digital Team to develop
communications to promote the garden waste permit scheme in rural areas. The
campaign will be aimed at increasing uptake rates of the garden waste collection but
will also focus on encouraging residents in rural areas to sign up for free food waste
only collections. It is anticipated that the campaign will launch late November to allow
residents time to sign up before1 April 2026. 
5.2. The project team is also developing communications to encourage other residents to
sign up early for next year’s garden waste permit scheme. In addition, work has
commenced on implementing autorenewal functionality which will allow residents to
automatically renew their permits in future years. 
5.3. On 4 August 2025, Waste Service launched a home composting pilot which, due to
the success of the first phase, is due to be extended.  The next phase of the pilot will
be launched to coincide with Climate Week (29 September to 5 October) with potential
for a third and final phase should there be continued demand.   
5.4. Waste Services have commenced a review of the garden waste project with a view to
identifying ‘lessons learned’; this is aimed at improving the service in future years.
Based on feedback from residents, a particular focus will be placed on improving future
‘householder communications’ for the project. The review will also include an
assessment of resourcing requirements to ensure continued success of the service
going forward.   
6. Employee Implications
6.1. There are no employee implications as a result of this report. The Service is reviewing
future resourcing implications associated with managing the project in future years and
will provide an update to the appropriate Committee as required.   
7. Financial Implications
7.1. As at Period 5 net income generated from the permit scheme exceeds the year 1
estimate of £0.585m. A further update will be included in Community and Enterprise
Financial Monitoring reports later in the financial year. 
8.  Climate Change, Sustainability and Environmental Implications
8.1.  There are no new climate change, sustainability or environmental implications
associated with the content of this report.   
9.  Other Implications
9.1.  There are no other implications associated with the content of this report. 
10.  Integrated Impact Assessment and Consultation Requirements
10.1.  This report does not introduce a new policy, function or strategy, or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required. 
10.2.  There is also no requirement to undertake any further consultation in terms of the
information contained in the report. 
199

Page 200

David Booth 
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes
♦ Accountable, effective, efficient, and transparent
♦ Fair, open and sustainable
♦ We will work to recover, progress and improve 
Previous References
♦ Community and Enterprise Resources Committee, 18 June 2024
♦ Executive Committee, 26 June 2024 
List of Background Papers
♦ None 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:- 
Kevin Carr, Head of Facilities Waste and Grounds 
Ext: 4708 (Phone: 01698 454708) 
E-mail: Kevin.Carr@southlanarkshire.gov.uk
200

Page 201

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Roads Asset Management Plan 2025 - Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Roads Asset Management Plan (RAMP) and outline
the condition of roads and related infrastructure assets 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the contents of the report be noted. 
3. Background
3.1. The Road Asset Management Plan (RAMP) is a strategic framework that outlines the
key principles and practices for the effective management, maintenance, and
enhancement of our road network and related infrastructure. The development of
RAMPs across Scotland is an excellent example of collaborative working across all
32 councils. 
3.2. The five key principles of an effective RAMP are: 
1. Lifecycle Approach: Manage assets from planning and design through to
maintenance, operation, and disposal, ensuring optimal performance, cost
efficiency, and service delivery over the asset's entire life. Ensure a sound
knowledge of the extent and condition of our main asset groups. 
2. Prioritisation Based on Risk: Assess and manage risks related to safety,
performance, and financial impact. Prioritising road asset investment based on
risk and condition ensures critical assets are maintained to prevent failures and
service disruptions. 
3. Informed Decision Making: Utilise accurate, up-to-date data on road condition,
traffic volumes, and performance trends to inform maintenance schedules and
investment decisions. Using local knowledge and understand where any
knowledge gaps exist and consider how these might be addressed. 
4. Cost-Effectiveness: Focus on achieving the best possible value from
investments, balancing the need for immediate repairs with long-term
sustainability. This involves considering both short-term maintenance needs and
long-term capital investment in infrastructure.  
15
201

Page 202

5. Sustainability and Resilience: Integrate sustainability by minimising
environmental impacts, promoting resource efficiency, and ensuring roads are
resilient to climate change and extreme weather events. This ensures that road
networks remain reliable and adaptable in the face of future challenges. 
3.3. The roads asset consists of the following main groups. 
Asset Type Asset Description and Components
Carriageway The part of the road used by vehicles. This asset group includes
drainage systems, lay-bys, bus lanes, traffic calming and verges.
Footways,
Footpaths and
Cycleways
Footways – used by pedestrians adjacent to the carriageway.
Footpaths – used by pedestrians remote from the carriageway.
Cycleways – used by cyclists and in some cases pedestrians.
Pedestrianised Areas – generally located in town centres.
Structures Primarily bridges and culverts with a span greater than 0.9 metres
and retaining walls with minimum retained height of 1.35 metres.
Street Lighting Includes lamps, columns, ducts, cabling, control pillars, illuminated
road signs and bollards and festive lighting
Traffic
Management
Systems
Signalised junctions and  pedestrian crossings, detection equipment,
ducts, and cabling
Street Furniture Vehicle restraint systems (safety fence) 
4. Carriageway Asset
4.1. The Council is responsible for approximately 2,295 kilometres (1,426 miles) of
carriageway. The Council’s carriageway network is divided into four classifications
A, B, C and Unclassified. 
4.2. Inventory records are accurate for the lengths of road; however, the widths of the road
are estimated based on classification of the road. Over time, these widths will be
collected and added into our network management system and will aid with
quantification and refinement of the valuation of the carriageway asset. 
4.3. The Gross Replacement Cost (GRC) and overall value of the recorded carriageway
asset for South Lanarkshire Council is £2.263 billion. 
4.4. Safety inspections are carried out in accordance with the Guidance Document for
Road Safety Inspections and Defect Categorisations. This manual takes cognisance
of the guidance contained within Well Managed Highway Infrastructure Code of
Practice. These safety inspections are carried out on a monthly, three monthly or
annual basis depending on the hierarchy of the carriageway. 
4.5. In addition to these inspections, regulatory inspections to deliver our obligations
under the New Roads and Street Works Act 1991 (NRSWA) and the Transport
Scotland Act 2019 are also carried out.  
202

Page 203

4.6. Annually, the Scottish Roads Maintenance Condition Survey (SRMCS) is undertaken
on our road network by the Scottish Collaboration of Transportation Specialists’
(SCOTS) nominated contractor WDM Ltd. This survey tackles 100% of our A class
carriageways in one direction, with the other direction being surveyed the following
year. 50% of our B and C class roads are surveyed with the whole of the B and C
class network being surveyed over a four-year period. Only 10% of our unclassified
road network is completed each year. This survey produces our Road Condition
Index (RCI) based on the percentages above and applied to the whole of the network.
The survey identifies for each 10-metre section of road whether it  falls into the red
category (requires maintenance) amber (should be considered for maintenance) or
green (serviceable). The RCI is published each year as a national performance
indicator. 
4.7. In 2023, the backlog for carriageway maintenance across Scotland was recalculated
by WDM Ltd, based on the latest SRMCS survey data at the time. The backlog
calculation for the South Lanarkshire Council road network is £106.494m, up from
the previous figure of £90.420m. This is the sum of money that would be required to
be invested in a single year to bring our road network back to a serviceable standard. 
4.8. The increased backlog figure is mostly due to a notable regression in the condition
of our road network and continuing inflationary cost pressures in the construction
industry most in relation to plant and material costs. 
4.9. The overall condition of all our carriageways has regressed following the recent
survey as outlined in the table below. The latest RCI data indicates that 32.5 % of
our network needs maintenance treatment which is an increase of 0.6% on the
previous year and as reported to Committee last year. The RCI is the combined value
of the red and amber categories referenced at 4.6 and, overall, noting that a lower
figure is better. 
4.10. Full trend charts showing the Road Condition Index for A, B, C and Unclassified roads
are shown in Appendix A. 
37.5 37.5 38 37.5 36.8
35.9
33.8 33.5 33.1
31.8 31.2
30.3 30.6
29.7
30.8
31.9 32.5
20
25
30
35
40
South Lanarkshire Network
RCI
203

Page 204

4.11. Our position in Scotland in terms of RCI ranking has declined as shown below from
our highest ranking of 7th reported over the period 2018-20 to position 14 over the
most recent survey period 2023-25, 2 places lower than last year. 
4.12. A revised assessment was undertaken by WDM Ltd in 2023 to update the Steady
State cost for South Lanarkshire’s network. The steady state is the amount of
investment required to maintain the road network in its current condition. The steady
state figure, which is based upon the needs / condition of the carriageway network
has increased to £16.525m after the revised assessment in 2023 – up from
£12.500m. 
4.13. Whilst the steady state figure has increased by 33 %, it should be borne in mind that
the figure is an estimate, based on a range of survey data, and increases due to
assumptions around increases in prices, rather than an actual figure and largely
reflects the significant price increases across the sector. The steady state figure is
intended to be an indication of the magnitude of potential investment needed in South
Lanarkshire and is used across Scotland. It is important to note that the need to
improve the condition of the road network is prioritised on an individual basis to
support and justify expenditure. The steady state figure is, therefore, indicative and
could increase or decrease based on actual condition of our network or the level of
indexation applied. 
4.14. During this financial year 2025/2026, approximately £11.946m in capital is being
directed towards carriageway improvements and the balance of £3.425m towards
other asset groups.  The increased £12.000m capital investment made available this
year, to be distributed over the next three years, is a vital and positive step forward.
This additional funding will play a key role in slowing the rate of network deterioration,
provide some stability and begin to support long-term asset resilience.  
19
16 17 18 19 19
13 14
13
10
9
7 8
10 12 12 14
0
4
8
12
16
20
24
28
32
South Lanarkshire Network (out of 32 RA's)
Network
204

Page 205

5. Footway Asset
5.1. The Council is responsible for a total of approximately 2,425 kilometres (1,506 miles)
of footway. It should be noted that this figure represents adopted footways / footpaths
only and there are other footpaths that are maintained by other parts of the Council
or third parties. Most of the adopted footway network is contained within the urban
area. 
5.2. The length of footway network is an estimated length based on there being two
footways on each length of carriageway within the urban area. All footways have been
estimated as having a 2-metre width. The Gross Replacement Cost (GRC) of the
recorded footway asset is presently estimated at £612.7m. 
5.3. Inspection arrangements and maintenance categories are similar to those for
carriageways in terms of the nature of inspections, but the frequencies can vary
depending on the hierarchy. 
5.4. There is no national condition survey for footways similar to that which is undertaken
for carriageways. Instead, priorities for resurfacing are established via the local
knowledge of our officers considering the condition of a footway and its level of use. 
5.5. A sample survey of 59.2% of our estimated footway length was undertaken in calendar
years 2014, 2015, 2016 and 2017 which indicated that 16.2% of our footways should
be considered for maintenance purposes. This figure is likely to have increased since
the sample survey. As advised previously to Committee, updating this figure is very
resource intensive, and it is not presently considered viable to do so. 
5.6. During this financial year 2025/2026, approximately £1.350m is being directed
towards footway improvements. An internal assessment of the steady state figure for
footway maintenance has been calculated slightly higher at £1.400m. 
6. Lighting Asset
6.1. The Council has 62,983 lighting columns, 67,091 luminaires, 2,315 Control Pillars and
an estimated 2,120 kilometres (1234 miles) of cabling. Inventory records for lighting
columns, luminaires and control pillars are accurate, however, inventory of the cabling
network and knowledge of its condition is limited as most of it is underground. 
6.2. The percentage of lighting columns exceeding their design life is 46%, giving the
Council the fifth oldest lighting column stock in Scotland. The cost to replace all these
columns at current rates would be £86.916m. The cost to maintain the lighting asset
in its current condition (steady state) is £1.800m. This should be considered relative
to existing capital and revenue funding for 2025/2026 of approximately £0.953m. 
6.3. The trend in columns beyond their design life regressed in the last year, from
35.9% to 46% due to the current age of columns.  Current investment is focusing on
targeting columns based on their structural condition and we replaced 358 columns
in 2024/2025. 
7. Structures Asset
7.1. The Council is responsible for a total of 778 structures which includes road bridges,
footbridges, culverts, and subways together with a currently unquantified number of
road related retaining walls.  
205

Page 206

7.2. Good records are held for most of these assets, however, there are currently limited
records held by the Council in respect of road related retaining walls. 
7.3. The current Gross Replacement Cost of the Structures asset is estimated at £625.9m,
up from £583.3m. This figure does not include the replacement cost of any road
related retaining walls. 
7.4. Bridge inspections are carried out in accordance with the guidance and
recommendations of the “Well Managed Highway Infrastructure: A Code of Practice”
published by the UK Roads Liaison Group. This recently published Code encourages
the use of a risk-based approach toward identifying bridge inspection intervals. At
present, General Inspections are carried out every two years and Principal Inspections
every six years on all structures with a span more than 0.9m. More frequent
inspections are carried out on structures where more specific monitoring of condition
is appropriate (e.g. where assessments have indicated potential capacity issues). 
7.5. Routine repairs that are identified during the bridge inspection process are prioritised
considering the severity and extent of the defect which has been observed. 
7.6. There are 102 steel bridges across the structures asset. Properly specified and
applied protective paint systems are expensive but serve to prolong the life span of
steel structures and can substantially extend intervals between maintenance and
repair operations. The introduction of a formalised maintenance painting regime for
our steel bridges would be of significant benefit, however, this work is tackled on a
needs basis as funding permits. 
7.7. Investment during 2024/2025 on bridge maintenance and renewal was £1.0m. This
figure includes targeted investment for the maintenance and repairs of four South
Lanarkshire Council structures, which formed part of the East Kilbride electrification
project, with the construction phase ongoing throughout 2024/2025. The cost to
maintain the structures asset in its current condition (steady state) is £6.88m up from
£6.42. Excluding any major capital projects, investment across capital and revenue
during 2025/2026 is expected to be circa £1.05m. 
7.8. In addition to the inspection process discussed above, a national assessment
programme, carried out to determine the suitability (i.e. strength) of the bridge assets
for the introduction of 40/44 tonne vehicles onto the road network, revealed 123
bridges to have a load bearing capacity below current standard. A comprehensive
bridge strengthening programme has, in recent years, seen excellent progress in
addressing the Council’s weak bridges. Of the 123 bridges which failed the
assessment, only 16 remain to be addressed. These are subject to an enhanced
monitoring and inspection regime. 
7.9. The bridge assessment process included a risk analysis of vehicle containment
characteristics at each bridge location. The results of the analysis revealed that, in
terms of risk and containment, parapets on 8% of the Council’s bridge stock require to
be upgraded. A programme to improve vehicle containment capability at these
structures has been initiated. Due to competing priorities, there were no further
containment upgrades undertaken in 2024/2025 and 52 structures remain
outstanding as a priority for the implementation of improvement measures.  
206

Page 207

7.10. If current funding levels continue and depending on the nature and priority afforded
to other commitments arising, it is expected that we will be able to complete several
containment improvement schemes per year in future years; noting however that
none are able to be prioritised for 2025/2026. Again, in terms of risk and containment,
the need for upgrading works at the remaining 92% of bridges is currently considered
low. It should be recognised that some of these parapets do have containment issues,
but the level of risk is low given the site characteristics. 
7.11. The condition of all highway structures is determined following a General or Principal
Inspection and rated in accordance with the ADEPT Bridge Condition Index (BCI)
Guidance. BCI values are generated from ratings apportioned to the severity and
extent of defects recorded during a bridge inspection and can be interpreted broadly
as the percentage condition score of a bridge or a group of bridges. Separate BCI
figures are derived to account for the condition of all structural elements of a bridge
(BCIav) and for the condition of those elements defined as being of very high
importance (BCIcrit). The condition indicators for the entire bridge stock as a single
group over the past six years are as follows, noting the higher figure indicates better
condition. 
Year BCIav BCIcrit
2018/19 83.68 72.11
2019/20 82.51 70.39
2020/21 81.87 68.76
2021/22 81.21 68.48
2022/23 81.22 68.53
2023/24 81.20 68.50
2024/25 80.84 68.33 
7.12. It may be observed from the second and third columns in the above table that BCIav
and BCIcrit values for the entire asset fluctuate slightly over time but have remained
within the range of “good condition” (BCI value 80-90) and “fair condition” (BCI value
65-80) respectively throughout the last six years. A minimal decrease in the value of
both condition indicators was recorded in 2024/2025. It should be noted that there
has been a reduction in the value of both indicators over the past 6 years which
represents an overall and ongoing deterioration in asset condition within that
timescale. 
7.13. The assembly of a register of road related retaining walls within South Lanarkshire
commenced in 2014/2015 and we now have 199 walls recorded. The retaining wall
asset will be of significant magnitude and the formation of the database which will
contain several thousand items is a long- term commitment for the Council. The code
of practice suggests that all road related retaining walls should be subject to the same
type of inspection regime as is currently carried out on bridges and culverts (see
section 7.4).  
207

Page 208

8. Traffic Signals
8.1. The Council is responsible for 237 sets of traffic signals and controlled pedestrian
crossings. The numbers and different types of installations are listed below: - 
 113 Traffic Signals
 60 Puffins
 6 Pelicans
 58 Toucans 
8.2. South Lanarkshire has an ageing traffic signal and pedestrian crossing asset base,
with many utilising older and energy inefficient technology. In recent years, the Council
has initiated a programme to replace older traffic signals and pedestrian crossings with
modern ones. The replacement of an average traffic signal junction costs in the region
of £0.290m and a pedestrian crossing around £0.090m. The existing level of funding
generally allows for the renewal of one traffic signal junction per year or 3 pedestrian
crossings. 
8.3. External funding does allow other infrastructure to be renewed but this is a changing
situation as it is dependent on the availability of funding and our ability for a project
to meet grant conditions. These new installations both maximise the safety benefits
to all road users and improve the flow of traffic using modern computer control
systems such as Microprocessor Optimised Vehicle Actuation (MOVA) and Split
Cycle Offset Optimisation Technique (SCOOT). 
8.4. Typically, the Service receives and respond to approximately 1,500 traffic signal
faults annually. In 2024/2025, this increased to 1,871. This can be explained by
addition of more fault monitoring within the various systems in operation and an
increase in incandescent lamp faults due to there only being one manufacturer and
the quality of their product. 
8.5. The gross replacement value of all traffic signal apparatus is currently estimated at a
value of £48.8m, up from £47.0m. The cost to maintain the traffic signal asset in its
current condition (steady state) is £2.930m. 
8.6. In 2025/2026, funding of around £0.650m is being directed towards investment in
traffic signal infrastructure. 
8.7. The Service continues to try and adopt a 15-year lifecycle plan, although the
replacement of each asset is still assessed on an individual need’s basis. Any plan
longer than this would result in reliability issues arising and, over recent years, some
installations have failed, resulting in emergency replacement works being necessary.
The Council currently has 38 sets of traffic signals and 50 pedestrian crossings
(representing 37% of our assets) that are 15 years old or older. 
8.8. It should also be noted that there is now a limited supply of incandescent lamps due
to a change in legislation prohibiting their use and with the reducing demand, lighting
manufactures ceasing their manufacture. The Council currently has supply for 10
sets of traffic signals and 12 pedestrian crossings that use these incandescent lamps.  
208

Page 209

8.9. The age of the equipment is generally increasing quicker than replacement
equipment is being installed, therefore, the trend for the overall condition of the asset
continues to regress most years. While these older installations continue to operate,
the risk of them failing is higher than at other locations with potentially greater impact
if they fail during a busy period of the year. 
9. Street Furniture - Vehicle Restraint Systems
9.1. There are currently 515 vehicle restraint systems, totalling 43.3 Km. Our last
assessment indicated approximately 20% of the systems had reached the end of
their serviceable life (life expired) due to having timber posts suffering from rot as
opposed to steel posts. Some systems have also suffered from extensive corrosion. 
9.2. Approximately 10% of existing systems are damaged, and an estimated 95% of the
systems surveyed would not comply with current design standards, although there is
no need to retrospectively replace older installations unless they have suffered
significant damage and need replacement. Repairs are prioritised in line with available
funding. 
9.3. The estimated gross replacement cost of the vehicle restraint systems which would
bring the systems up to current standards is £25.050million, up from £12.970m. The
estimated cost to replace older systems remains £8.6million. The estimated annual
cost to maintain the asset in its current condition (steady state) remains as £0.400m
and at present investment in limited in this area and is only directed on a reactive
basis. 
10. Conclusions and Summary
10.1. Roads and related infrastructure keep our communities and businesses connected.
Businesses use it to deliver goods and services, buses travel along it, people use it
to travel to work and communities to access shopping, learning, healthcare, and
active travel priorities. 
10.2. This paper sets out the overall condition of this infrastructure and important matters
to note are as follows: 
 Carriageways: The condition of our carriageways has continued to regress as
shown in the recent survey results. It is anticipated that the increased investment
will stabilise the recent regression, however further deterioration in the condition
of our carriageway asset should still be expected given the time lag in terms if
investment on the ground and survey results. 
 Footways / Footpaths: At least 16.2% of our network requires to be considered
for maintenance. Again, it should be noted that due to current levels of funding
we can expect further deterioration of this asset. 
 Structures: Bridge condition is generally good to fair although the overall trend
has been one of slow deterioration. Good progress has been made in dealing
with bridges assessed as being inadequate for current loading standard,
however, greater investment is required in the maintenance of the bridge stock.
It should be noted that while funding is allocated for 2025/2026, we can expect
further deterioration of this asset.  
209

Page 210

 Street Lighting: Recent investment has reduced energy use by approximately
half and replaced 7,253 of the oldest lighting columns representing significant
progress. The current percentage of lighting columns exceeding their design life
is 46%. 
 Traffic Management Systems: The overall condition of traffic signal equipment
is deteriorating as the current replacement programme is not sufficient to upgrade
the number of installations that are greater than 15 years in age. With the current
levels of funding, we can expect further deterioration of this asset. 
 Street Furniture: The condition of vehicle restraint systems is such that a
significant number are beyond their design life and require to be improved. A
prioritised programme of sustained investment will be required. 
11. Employee Implications
11.1. There are no current employee implications associated with this report. 
11.2. The current backlog of repairs continues to increase demand on our engineering and
technical employee resources. The current increase in the backlog is increasing the
levels of complaints, road defects and public liability claims, and an appropriate level
of employee resources is required to manage this workload. 
12. Financial Implications
12.1. Since the long-term Roads Investment Programme was completed in March 2019,
the Council has continued to invest funding, to maintain the condition of our network.
In recent years significant financial challenges, as well as construction inflation has
been encountered which has reduced the amount of works we were able to carry out
for the budget we have available. In recent years we have tried to maintain levels of
investment at consistent levels. 
12.2. Sustained investment in roads and related infrastructure is essential to preserve the
benefits of previous significant funding and to avoid higher costs in the future. The
increased £12.000m capital investment made available this year, to be distributed
over the next three years, is a vital and positive step forward. This additional funding
will play a key role in slowing the rate of network deterioration, provide some stability
and begin to support long-term asset resilience. 
12.3. In addition, our road network remains extremely vulnerable to the impacts of extreme
weather, climate change and utility openings. Severe weather continues to directly
impact our roads and assets which further increases the pressure on our finite
resources available to maintain the condition of our network. Utility openings are
increasing as providers seek to maintain their critical infrastructure the majority of
which is reaching the end of its serviceable life. 
12.4. It is acknowledged that both capital and revenue investment opportunities must be
considered alongside a wide range of competing priorities across the Council.
Striking the right balance remains a significant and ongoing challenge. Maintaining
funding at a steady-state level offers a more sustainable long-term outlook. This
approach helps mitigate the risk of further deterioration in the road network, which
would otherwise require even greater investment in the future—potentially at a level
that is less affordable than committing to steady-state funding today.  
210

Page 211

12.5. Opportunities continue to be taken to secure and lever in new sources of funding
including external partner funding where possible. Success has already been
achieved in securing external funding for traffic signal and active travel investment;
this has also allowed us to tackle wider corridor maintenance priorities. 
13. Climate Change, Sustainability and Environmental Implications
13.1. Policy and asset management directed at maintaining, improving, or making road and
transport infrastructure safe and resilient is essential to support economic and
sustainability priorities. 
13.2. The financial challenges outlined earlier in this report present significant barriers to
funding improvements that would enhance the resilience of our road network against
the impacts of climate change. Nonetheless, we welcome the allocation of funding in
2025/2026 from the Climate Emergency Fund, which will support trials of low-carbon
surfacing materials. These trials represent a positive step toward achieving our long-
term sustainability goals and carbon reduction targets. 
14. Other Implications
14.1. There are no other implications or risk in relation to the information contained within
this report. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no impact
assessment is required. 
David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible  
211

Page 212

Previous References
Roads Asset Management Plan 2024 - Update, Community and Enterprise Resources
Committee, 17 September 2024 
List of Background Papers
Roads Asset Management Plan – 2025 Update 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact: 
Colin Park, Head of Roads, Transportation and Fleet Services
Tel: 07795 090 494
E-mail: colin.park@southlanarkshire.gov.uk
212

Page 213

Appendix A 
RCI Charts for A, B, C and Unclassified Roads 
30.2
28.9
28
27.2
25.9
22.7
21
22.2
23 22.9 23.3 23.2
23.9 24 23.9
24.9
27.7
20
22
24
26
28
30
32
34
RCI Value
South Lanarkshire A Class
A Class
32.3
29.7 30.1
31.8
30.4
25.0
22.7
23.7 24.1 24.5 25.0 25.3
26.2 25.6 26.1
27.8
29.6
20.0
22.0
24.0
26.0
28.0
30.0
32.0
34.0
RCI Value
South Lanarkshire B Class
B Class
213

Page 214

44.1
41.4 41.5
44.6
41.1
40.0
38.9
36.9
37.9
37.1 36.7
37.7 37.6
34.9
35.6
36.5
37.4
33.0
35.0
37.0
39.0
41.0
43.0
45.0
RCI Value
South Lanarkshire C Class
C Class
37.8
39.5
40.5
38.7 39.0 39.5
37.0 36.8
35.5
33.4
32.3
30.3 30.5 29.9
31.6
32.6 32.4
28.0
30.0
32.0
34.0
36.0
38.0
40.0
42.0
RCI Value
South Lanarkshire Unclassified
U Class
214

Page 215

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 7 October 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Annual Update on the Community and Enterprise
Resources' Risk Register 
1. Purpose of Report
1.1. The purpose of the report is to:- 
[
 present an annual update on the Risk Register for Community and Enterprise
Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the current position with regards to the Resource Risk Register be noted.
[1recs]
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes. The Strategy requires Resources
to record and review risks and control actions regularly. Community and Enterprise
Resources follows the guidance in developing, monitoring and updating the Risk
Register on an ongoing basis. 
3.2. The Council’s updated Risk Management Strategy was rolled out via a Management
Bulletin with an effective date of 1 April 2025. 
3.3. The purpose of the Community and Enterprise Resources’ Risk Register is to ensure
that the Resource is fully aware of its top risks; that these risks are prioritised; and that
controls are in place to eliminate or minimise the impact of the risks. 
3.4. The Resource scores the risks in accordance with the Council scoring mechanism,
based on likelihood and impact. This results in risks being scored between one and
twenty-five (low – very high). 
3.5. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls). The Council’s scoring matrix is attached at Appendix 1. 
3.6. The previous review of the Community and Enterprise Resources Risk Register was
reported to the Community and Enterprise Resources Committee on 26 November
2024. The Resource’s Risk Register has now been reviewed. This work was
completed in August 2025.  
16
215

Page 216

3.7. The Central Risk Management team annually review Resource compliance with the
strategic requirements of the Risk Management Strategy. The outcome of the
2024/2025 review identified that Community and Enterprise Resources achieved 100
per cent compliance, scoring 45 out of a possible 45. 
4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility for
the promotion and management of risk. The Community and Enterprise Resources’
Risk Management Group continues to consult as required. 
4.2. In finalising the review of the Resource Risk Register, the Resource Risk Group
considered risks at a Service level, as well as strategic Council risks. 
5. Risk Register
5.1. The Resource Risk Register will be monitored on an ongoing basis to allow new risks
to be added and for the control measures and scores of the existing risks to be
reviewed in light of new information. 
5.2. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts or legislative changes or the impact of internal service
changes. 
5.3. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate, resulting in some actions within the Resource Plan
having a corresponding risk identified within the Risk Register. 
5.4. The main changes to the Register this year are summarised below: 
 Two Council Top Risks have been removed: 
 ‘The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities transferring to the Council.’ 
This risk has been removed following the recent sale of the Regent
Shopping Centre in Hamilton and agreement to demolish Centre West in
East Kilbride. There are no other shopping centres where ownership may
transfer back to the Council due to ownership of land.
 ‘The provision of Council services is disrupted due to industrial action.’  
This risk has been removed due to the recent agreement of a two year pay
deal for all staff members. 
 The scoring of two Council Top Risks has increased:
 ‘Information governance not subject to adequate control’ has increased from
12 to 16. Information governance has been added as a new area in the
annual governance statement for 2024/25 given current levels of
performance in responding to FOI’s and SAR’s and an awareness of the
impact of security information incidents. The perception of this risk is
increased with the introduction of new IT systems planned for 2025/26.
 ‘Inability to maintain infrastructure, assets and properties in a well-
maintained condition and difficulties achieving the objectives of asset and
property reviews’ has increased from 9 to 12. The increase in risk score
reflects an ageing property asset portfolio against limited funding available
to maintain.  
216

Page 217

 Two Council top risks have been consolidated and re-worded to cover all types of
civil emergency rather than specific pandemic/endemic events.  The two risks are: 
 ‘The Council does not have the appropriate emergency/business continuity
plans; contingency arrangements or partnerships in place to respond
to/recover from a pandemic/endemic event’ and ‘Failure to fulfil emergency
response commitments befitting the council’s status as a Category One
(emergency) responder’. The new wording is
 ‘The Council does not have the appropriate resilience measures, emergency
or business continuity plans in place to respond efficiently as a Category 1
Responder to a civil emergency.’ 
 Some key risk descriptions have been updated to reflect the current status of risks
and/or to provide more straightforward and understandable risk descriptions. 
5.5. Risks scored 20 to 25 are considered to be very high risks and risks scored 10 to 16
are considered to be high risks. High and very high risks are monitored closely. The
top risks identified for the Resource, that is those that are residually scored as being
high and very high, are attached at Appendix 2. 
5.6. Appendix 3 provides a comparison of risk scores for 2024 and 2025. This appendix
also details any significant changes made to the risks. 
5.7. Community and Enterprise Resources has ensured that all inherent risks scored at a
very high and high level have cost effective control measures in place. 
5.8. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
6. Insurance Hotspots 
6.1. An analysis of all claims received between 1 April 2022 and 31 October 2024 has been
undertaken by the Risk Management team to highlight the main cause of claims. This
analysis has been shared with Resources and feedback will be provided to the Risk
Management team on controls that are currently in place and any further planned
actions to mitigate against any hotspot areas identified. 
6.2. The following areas of work have been progressed over the last year to mitigate
insurance hotspots. 
Combined Liability
 An action plan has been prepared to address the issues identified during the health
and safety/training review by the Council’s claims handlers, Gallagher Bassett.
Actions are now being taken forward by relevant managers in conjunction with
Health and Safety and Risk Management.
 Roads and Transportation Services’ trial of Artificial Intelligence (AI) technology
associated with inspecting the roads network has ended and the evaluation is
continuing. 
7. Scope and Appetite for Risk
7.1. The Resource aims to be risk embracing, that is, it will accept a tolerable level of risk
in seeking service efficiencies and in agreeing control measures.  
217

Page 218

7.2. The level of risk facing the Resource is measured both before (inherent risk) and after
(residual risk) consideration of controls. The Council should never carry a very high
residual risk exposure as this would indicate instability, but a low residual risk exposure
should also be avoided as this indicates lack of innovation. 
7.3. The Council’s universal risk tolerance levels were updated as part of the review of the
Risk Management Strategy last year, with the ideal risk profiles now defined as:
 no more than 20 per cent of risks at a very high level
 no more than 25 per cent of risks at a high level
 around 40 to 50 per cent of risks at a medium level
 no more than 25 per cent of risks at a low level 
7.4. Table One below shows the Resource’s top risks heat map, i.e. it details the total
number of risks for each individual residual risk score. Table Two below notes the
overall risk profile for the top risks. 
Table One – Community and Enterprise Resources Top Risks Heat Map 
Likelihood
5
Almost Certain    3 
4
Likely   3 2 1
3
Possible  3 10 2 
2
Unlikely  4 11 4 
1
Rare  2 4 4 
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact  
Table Two – Community and Enterprise Resources Top Risks Risk Profile 
Risk
Category
Risk
Rating
Number
of risks
Percentage of
risks
1 Very high 4 8%
2 High 7 13%
3 Medium 28 53%
4 Low 14 26% 
7.5. The main changes to the Resource risk profile, as a result of the realignment of risk
categories are: 1 very high categorised risk is now categorised as a high risk, 1 very
high categorised risk is now categorised as a medium risk and 13 previously high
categorised risks are now categorised as medium risks.   
7.6. The profile detailed in Table Two is within the ideal universal risk exposure defined by
the Risk Management Strategy. There has been a reduction in the number of very high
and high risks and, as such, the profile is now closer to the ideal risk exposure level.
This is in part due to the revision to risk bandings and tolerance levels within the Risk
Management Strategy.  
218

Page 219

8.  Three Lines Model
8.1. The ‘three lines’ model was developed by the Institute of Internal Auditors. When using
this model, risk controls are categorised under three lines of defence. This aims to
provide assurance around the adequacy of control measures that are in place to
mitigate strategic risks, identify control descriptions that need amendment to clearly
link these to the mitigation of the risk and to highlight any residual gaps in controls that
require to be addressed. 
8.2. Internal Audit work on the three lines model for the top risks has been concluded, with
Resources provided with individual analysis and guidance to support them in
developing further controls to close any gaps identified from the three lines approach
for the Council top risks that they lead on.  Work is now ongoing to review and refine
risk controls. This is scheduled to be completed by 31 March 2026. 
9. Major Projects, Partnerships or Change
9.1. Within Community and Enterprise Resources, 21 partnerships have been identified.
Five of these are considered to be high risk. These are the Clyde Gateway Partnership,
Strathclyde Partnership for Transport (SPT), City Deal, Climate Ready Clyde
Partnership and Business Gateway. The remaining 16 partnerships have been
assessed as being low risk. 
9.2. Appropriate risk management arrangements are in place for the high-level
partnerships. 
10. Next Steps
10.1. The Resource Risk Management Group will continue to meet as required. The Risk
Register will be reviewed on an ongoing basis by the Group to ensure that risks remain
valid for the appropriate Service areas and to identify new areas of risk that affect the
Resource. An update report will be provided to Community and Enterprise Resources
Committee on an annual basis. 
11. Employee Implications
11.1. Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register. 
12. Financial Implications
12.1. There are a number of proposed risks within the Resource Risk Register which are
classified under the heading of ‘financial’ risks. Where this is the case, the appropriate
controls and actions have been included in the risk control cards and progress will be
monitored. 
13.  Climate Change, Sustainability and Environmental Implications 
13.1. There are a number of proposed risks within the Resource Risk Register which are
classified under the heading of ‘environmental’ risks. Where this is the case, the
appropriate controls have been included in the risk control cards and progress will be
monitored. 
13.2. Sustainability and climate change is included within the Council’s top risk register as
a standalone top risk and links directly to risks attached to the Council Plan outcomes
‘Caring, connected, sustainable communities’ and ‘Good quality, suitable and
sustainable places to live’.  
219

Page 220

14. Other Implications
14.1. Failure to demonstrate that risk is actively considered and managed can not only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resource’s reputation. 
15. Integrated Impact Assessment and Consultation Requirements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and therefore, no impact assessment
is required. 
15.2. Consultation on the content of this report has been undertaken with members of the
Community and Enterprise Resources’ Risk Management Group. 
David Booth
Executive Director (Community and Enterprise Resources) 
17 September 2025 
Link(s) to Council Values/Priorities/Outcome
 Accountable, effective, efficient, and transparent   
Previous References
 Community and Enterprise Resources Committee – 26 November 2024 - Annual update
on Resource Risk Register and Risk Control Action Plan 
List of Background Papers
 Figtree extract (risk register) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Gayle Forrest, Support Team Leader Tel:  07786 855498
E-mail:  gayle.forrest@southlanarkshire.gov.uk  
220

Page 221

Appendix 1 – Risk scoring matrix and likelihood and impact definitions 
Likelihood 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood
of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability
of
occurrence
The event
may occur in
certain
circumstance
The event
could occur
The event
may occur
The event will
probably
occur
The event is
expected to
occur or
occurs
regularly 
Impact 
Reputation Financial Service
delivery/
Time to
recover
Compliance Safety
1
Negligible
Public
concern
restricted to
local
complaints
<£50,000 per
annum
No impact to
service quality;
limited
disruption to
operations.
No external
interest
Minor
injury –
no lost
time
2
Minor
Minor adverse
local/public/m
edia attention
and
complaints
£50,000-
£250,000 per
annum
Minor impact to
service quality;
minor service
standards are
not met; short
term 
Very minor
attention from
legislative
/regulatory
body
Minor
injury –
resulting
in lost
time
3
Moderate
Adverse
national
media
Public
attention
£250,000 to
£500,000 per
annum
Significant fall in
service quality;
major
partnership
relationships
strained; serious
disruption in
service
standards
Short-term
attention from
legislative/
regulatory
body 
Major
injury or
ill health
resulting
in lost
time
4
Major
Serious
negative
national or
regional
criticism
£500,000 to
£1million per
annum
Major impact to
service delivery;
multiple service
standards are
not met; long
term disruption
to operations;
multiple
partnerships
affected
Medium-term
attention from
legislative/
regulatory
body 
Fatality;
Or
injuries to
several
people
5
Catastrophic
Prolonged
international,
regional and
>£1million
per annum
Catastrophic fail
in service
quality and key
service
National
impact with
rapid
Multiple
fatalities;
Or
injuries to
221

Page 222

Reputation Financial Service
delivery/
Time to
recover
Compliance Safety
national
condemnation
standards are
not met; long
term
catastrophic
interruption to
operations;
several major
partnerships are
affected
intervention
of legislative/
regulatory
body 
large
number
of people 
The assessments for impact and likelihood combine to provide an overall inherent risk
score on the scale of between 1 and 25, using the Council’s recognised risk matrix. 
Risk matrix 
Likelihood
5
Almost
Certain
5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
The risk score is calculated as follows: 
Likelihood score x Impact score = Risk Score 
222

Page 223

Appendix 2
Community and Enterprise Resources Risk Register (as at August 2025) – 
Extract of risks with residual score category of Very High and High 
Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
1
Very High
(20-25) 
The Budget Gap that the Council faces
across the medium term continues to be the
biggest risk faced by the Council. The
Budget Gap is the result of the cumulative
real terms reductions in Government
funding as well as the ongoing impact of
increased demand, increased cost of
services due to inflation, and increased
staff costs resulting from pay awards. The
potential of reduced fees/income being
received by the Council would further add
to budget pressures across services
Council Top Risk 
25
Very high
• Reports prepared to Council timetable and
reported to relevant Committee to provide
assurances that income and expenditure is
within budget and regular updates provided
to Executive Director Finance and Corporate 
• Robust arrangements in place to monitor
service delivery outturns against budgets
• Implications of changes to service provision
managed through consultation, impact
assessments and Trade Union negotiation 
• Promotion of new/updated policies via
website, press and social media
• Management of outsourced work including
regular contractor meetings as appropriate
20 
Very high
The Council, in conjunction with its
partners, is unable to provide the required
support to reduce the overall impact of the
cost-of-living crisis on households in South
Lanarkshire, resulting in increasing levels
of poverty, debt and poorer outcomes for
people  
Council Top Risk 
25
Very high 
• Provision of support to local business by
Economic Development
• Increased School Meal provision / breakfast
clubs 
• Provision of free school meals to recipient
of school clothing grants
• Resourcing and support to the provision of
‘Warm Spaces’ hubs in Lifestyle Centres /
Libraries and other council properties
20
Very high 
223

Page 224

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
The council’s operations are affected by
fraud, theft, organised crime and cyber-
attacks
Council Top Risk 
25
Very high 
• Fraud risk registers in place within each
Resource and updated annually 
• Cyber / Information security Training Learn
on Line Modules; mandatory for all
employees
20
Very high 
Inability to take the necessary action due to
funding constraints, to combat climate
change, and work toward achieving net
zero carbon emissions by 2045, thereby
contributing to negative and irreversible
environmental, social and economic
impacts on the Council and its residents
Council Top Risk 
25
Very high 
• Sustainable development and climate
change is mainstreamed across the Council
and associated Plans, Policies and
Strategies
• Implementation of the Council's Sustainable
Development and Climate Change Strategy
and Carbon Management Action Plan 
• A long-term capital programme that tackles
climate change mitigation and adaptation 
• The preparation of a pipeline of climate
change and mitigation and adaptation
projects to attract investment/funding
• Active membership in Climate Ready Clyde
regional adaptation partnership 
20
Very high 
2
High
(10-16) 
Inability of the council to manage the
impacts that increasing frequency and
intensity of adverse weather events such as
floods, storms, cold and freezing conditions
and extreme heat, water shortages and
wildfires has on council service, budgets
and our communities
Council Top Risk 
20
Very high 
• Emergency planning arrangements in place
and contact details updated
• Effective management of existing budget
resources through regular reporting and
dialogue with Exec Dir Finance and
Corporate
• Remote monitoring of high-risk flood sites
using telemetry solutions
• Winter weather procedures, Winter Service
Policy and Ops manual (updated annually)
• Pothole inspection and rectification
programme using sub-contractors during
extended severe weather
16
High
224

Page 225

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score 
Information governance not subject to
adequate control
Council Top Risk   
20
Very high
• Compliance with Information Governance
Strategy
• Agreed service retention schedules
established
• IT / Electronic case and content
management Systems with facility to report
audit trails
• Information Governance checklist in place
16
High 
The council does not have the appropriate
resilience measures, emergency or
business continuity plans in place to
respond efficiently as a Category 1
Responder to a civil emergency
Council Top Risk 
25 
Very high 
• Financial support to third sector
organisations and local response groups to
assist their activity
• Business Continuity Plans prepared 
• Enhanced financial monitoring including
separated identification of additional
unbudgeted costs associated with a
pandemic
12
High 
Inability to maintain infrastructure, assets
and properties in a safe and well-
maintained condition and difficulties
achieving the objectives of asset and
property reviews
Council Top Risk 
20
Very high
• Programme of carriageway upgrading to
improve the road condition being
undertaken - progress monitored closely
through iMPROVE
• Regular monitoring by Roads and
Transportation managers of progress and
budgets
• Improvements to road related infrastructure
using Roads Investment Programme and
external funding
• Implement and maintain enhanced
structural monitoring of bridges and
structures
• Maintain list of qualifying bridges and
structures
12
High
225

Page 226

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
• Implement appropriate reactive mitigation
measures when need for repairs to road
infrastructure identified
• Option to close road if absolutely necessary
• Assessment of properties utilised by SLLC
to prioritise investment available from
Capital Programme 
Lack of capacity and skills to meet
increased service demands
Council Top Risk   
20
Very high 
• Performance Appraisal (PRD) process
including service learning and development
priorities and employee training plans 
• The Workforce strategy provides greater
level of organisational control rather than
service/resource specific and has a focus on
agile working
• Management Development and Leadership
Challenge Programme 
• Stress audit tool 
12 
High 
Failure to work effectively with the private
sector to support local businesses, town
centres and the rural economy 
16 
Very high
• Support to Business Improvement Districts,
town centres and other partnerships via
numerous channels include the ‘Invest in
South Lanarkshire’ website and
management of the Supplier Development
Programme including strategic
development and delivery of events,
training and e-commerce
• Regular operational and steering group
meetings and ongoing liaison with
partnership authorities (e.g. Clyde
Gateway, Lanarkshire Area Tourism
Partnership)
12
High
226

Page 227

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
• Implementation of the Community Led
Local Community Fund (CLLD), Community
Benefit funding in rural area with
appropriate funding in line with relevant
(e.g. rural) strategies 
The Council fails to deliver Town Centre
Masterplans 
15
Very high
• Options appraisals undertaken 
• Extensive public consultation 
• Specialist legal advice on all aspects
12
High  
227

Page 228

Appendix 3 – Comparison of the 2024 and 2025 Resource risk register 
Risk
Category
2024 Risk description 2024
Residual
risk
score
2025
Residual
risk 
score
Change in
residual risk
scores
Key changes 
The Budget Gap that the Council
faces across the medium term
continues to be the biggest risk
faced by the Council. The Budget
Gap is the result of the cumulative
real terms reductions in
Government funding as well as the
ongoing impact of increased
demand, increased cost of services
due to inflation, and increased staff
costs resulting from pay awards.
The potential of reduced
fees/income being received by the
Council would further add to budget
pressures across services
Council Top Risk 
20 20 = Amended wording
The Council, in conjunction with its
partners, is unable to provide the
required support to reduce the
overall impact of the cost-of-living
crisis on households in South
Lanarkshire, resulting in increased
poverty, debt and poorer outcomes
for people   
Council Top Risk   
20 20 = 
228

Page 229

Risk
Category
2024 Risk description 2024
Residual
risk
score
2025
Residual
risk 
score
Change in
residual risk
scores
Key changes 
The Council’s operations are
affected by fraud, theft, organised
crime and cyber-attacks
Council Top Risk 
20 20 = 
Inability to take the necessary action
due to funding constraints, to
combat climate change, and work
toward achieving net zero carbon
emissions by 2045, thereby
contributing to negative and
irreversible environmental, social
and economic impacts on the
Council and its residents
Council Top Risk 
20 20 = 
High Inability of the council to manage the
impacts that increasing frequency
and intensity of adverse weather
events such as floods, storms, cold
and freezing conditions and
extreme heat, water shortages and
wildfires has on council services,
budgets and our communities
Council Top Risk 
16 16 = Amended wording to recognise the
effects that the risk has on the
council and our local communities
and to acknowledge the effects
severe weather has on council
services and budgets
229

Page 230

Risk
Category
2024 Risk description 2024
Residual
risk
score
2025
Residual
risk 
score
Change in
residual risk
scores
Key changes 
Information governance not subject
to adequate control
Council Top Risk   
12 16  Scoring increased to reflect the
impact of new IT systems on
information management and the
need to raise awareness of the
impact of security information
incidents. 
The council does not have the
appropriate resilience measures,
emergency or business continuity
plans in place to respond efficiently
as a category 1 Responder to a civil
emergency
Council Top Risk   
12 12 = Consolidated and re-worded to
cover all types of civil emergency
rather than specific
pandemic/endemic events
Inability to maintain infrastructure,
assets and properties in a well-
maintained condition and difficulties
achieving the objectives of asset
and property reviews
Council Top Risk   
9 12  Scoring increased to reflect an
ageing property asset portfolio
against limited funding available to
maintain.
Lack of capacity and skills to meet
increased service demands
Council Top Risk   
12 12 = 
Failure to work effectively with the
private sector to support local
businesses, town centres and the
rural economy   
12 12 = 
230

Page 231

Risk
Category
2024 Risk description 2024
Residual
risk
score
2025
Residual
risk 
score
Change in
residual risk
scores
Key changes 
The Council fails to deliver Town
Centre Masterplans   
12 12 = 
231

Page 232

232