Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 04 August 2025 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 12 August 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John Anderson,
Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Andrea Cowan, Margaret Cowie,
Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal Johnston-Dempsey,
Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian McAllan, Kenny McCreary,
Davie McLachlan, Carol Nugent, Kirsten Robb, Helen Toner, David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lesley McDonald, Elaine
McDougall, Mark McGeever, Richard Nelson, Graham Scott, David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources
Committee held on 13 May 2025 submitted for approval as a correct
record.  (Copy attached) 
5 - 12 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2024/2025
Joint report dated 25 June 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
13 - 22 
4 Community and Enterprise Resources - Revenue Budget Monitoring
2025/2026
Joint report dated 25 June 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
23 - 32 
5 Community and Enterprise Resources - Capital Budget Monitoring
2024/2025
Joint report dated 14 July 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
33 - 38 
6 Community and Enterprise Resources - Capital Budget Monitoring
2025/2026
Joint report dated 14 July 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
39 - 42 
7 Community and Enterprise Resources – Workforce Monitoring – 1 March
to 31 May 2025
Joint report dated 12 June 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
43 - 50 
8 Community and Enterprise Resource Plan - Quarter 4 Progress Report
2024/2025
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
51 - 94 
Item(s) for Decision 
9 Primary School Expansion of Free School Meals - Scottish Child Payment
Joint report dated 23 July 2025 by the Executive Directors (Community
and Enterprise Resources) and (Finance and Corporate Resources). 
(Copy attached) 
95 - 98
2

Page 3

10  Packaging Extended Producer Responsibility (pEPR) Funding and Waste
Investment
Joint report dated 24 July 2025 by the Executive Directors (Community
and Enterprise Resources) and (Finance and Corporate Resources). 
(Copy attached) 
99 - 106 
11  Hamilton Town Centre Masterplan Update
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
107 - 112 
12  Scottish Government Vacant and Derelict Land Fund Programme
2025/2026
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
113 - 116 
13  Revocation of Whirlies (East Kilbride) and Rutherglen Air Quality
Management Areas - South Lanarkshire
Report dated 23 July 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
117 - 144 
14  Approval of South Lanarkshire Council's Food Service Plan for 2025/2026
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
145 - 172 
15  Renewable Energy Fund – Mill Rig Windfarm Contributions
Report dated 23 July 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
173 - 178 
16  Community Benefit Funds – Renewable Energy Fund - Grant Applications
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
179 - 184 
Item(s) for Noting 
17  Overtoun Bandstand Restoration
Report dated 23 July 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
185 - 188 
18  Clyde Metro Update
Report dated 4 August 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
189 - 198 
19  Strathclyde Regional Bus Strategy - Recommendations for Future Delivery
of the Regional Bus Network Update
Report dated 23 July 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
199 - 234 
20  Community and Enterprise Resources - Notification of Contracts Awarded
- 10 October 2024 to 31 March 2025
Report dated 23 July 2025 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
235 - 242 
3

Page 4

Urgent Business 
21  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 13 May 2025
Chair:
Councillor Robert Brown
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Andy
Carmichael, Councillor Ross Clark (substitute for Councillor Andrea Cowan), Councillor Gerry
Convery, Councillor Margaret Cowie, Councillor Colin Dewar, Councillor Allan Falconer (substitute
for Councillor Maureen Devlin), Councillor Gladys Ferguson-Miller, Councillor Ross Gowland,
Councillor Graeme Horne, Councillor Cal Johnston-Dempsey, Councillor Susan Kerr, Councillor
Richard Lockhart, Councillor Hugh Macdonald, Councillor Ian McAllan, Councillor Kenny McCreary,
Councillor Davie McLachlan, Councillor Carol Nugent, Councillor Kirsten Robb, Councillor Helen
Toner, Councillor David Watson
Councillors' Apologies:
Councillor Andrea Cowan, Councillor Maureen Devlin (Depute), Councillor Joe Fagan (ex officio),
Councillor Martin Lennon
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
F Carlin, Head of Planning and Regulatory Services; D Hashagen, Employability Manager; K Lean,
Economic Development Manager (Funding and Rural); C Park, Head of Roads, Transportation and
Fleet Services
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); L Harvey, Finance Manager (Resources); E Maxwell, HR
Business Manager; T Slater, Administration Adviser; L Wyllie, Administration Assistant
1 Declaration of Interests
No interests were declared.
2 Minutes of Previous Meeting
The minutes of the meeting of the Community and Enterprise Resources Committee held on 23
April 2025 were submitted for approval as a correct record.
In response to a member’s questions, the Executive Director (Community and Enterprise
Resources) gave an undertaking to provide details on:-
 the uptake in terms of those who previously did not have a burgundy bin.  He advised that
the number of permits issued to date was in the region of 30,000 but he awaited updated
figures
 the recruitment of additional waste operatives
In response to a further question, the HR Business Manager advised that the team was working
on a solution to enable the new system to produce information that was previously provided, in
terms of the number of vacancies and whether the posts were being filled.
The Committee decided: that the minutes be approved as a correct record.
2
5

Page 6

3 Community and Enterprise Resources - Revenue Budget Monitoring 2024/2025
A joint report dated 23 April 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April 2024 to 21 February
2025 and providing a forecast for the year to 31 March 2025 for Community and Enterprise
Resources.
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report.
At 21 February 2025, the projected outturn position for the Resource, before transfers to
reserves, was an underspend of £0.040 million.  Following the Council’s Probable Outturn
exercise, the forecast to 31 March 2025 was a breakeven position, after approved transfers to
reserves.
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in the appendices to the report.
The Finance Manager (Resources) responded to the Chair’s question in relation to the Care of
Gardens Scheme for private residents.
The Committee decided:
(1) that the forecast to 31 March 2025 of a breakeven position, after approved transfers to
reserves, as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved.
[Reference: Minutes of 25 February 2025 (Paragraph 3)]
4 Community and Enterprise Resources - Capital Budget Monitoring 2024/2025
A joint report dated 15 April 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ Capital Programme 2024/2025 and summarising the
expenditure position at 21 February 2025.
The revised Capital Programme for 2024/2025 for the Resource amounted to £47.364 million.
This was based on the overall Capital Programme for 2024/2025 and included adjustments
approved by the Executive Committee on 26 June 2024.
Appendix A to the report detailed the financial position for the Resource and provided a forecast
for the financial year of £38.925 million.  This forecast underspend reflected the timing of spend
across the year and funding would be carried forward to 2025/2026 to allow projects to be
completed.  Actual expenditure to 21 February 2025 was £24.308 million.
The Committee decided: that the Community and Enterprise Resources’ Capital
Programme of £47.364 million, and forecast expenditure of
£38.925 million, be noted.
[Reference: Minutes of 25 February 2025 (Paragraph 4) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 6)]
6

Page 7

5 Community and Enterprise Resources - Workforce Monitoring – January and
February 2025
A joint report dated 3 April 2025 by the Executive Directors (Finance and Corporate Resources)
and (Community and Enterprise Resources) was submitted on the following employee
information for Community and Enterprise Resources for the period January and February
2025:-
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 December 2024
In response to a member’s question, the HR Business Manager confirmed that Staffing Watch
figures were reported in line with COSLA timeframes.  She also confirmed that work was
ongoing to encourage participation in exit interviews.
The Committee decided: that the report be noted.
[Reference: Minutes of 25 February 2025 (Paragraph 5)]
6 Community and Enterprise Resource Plan 2025/2026
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the Community and Enterprise Resource Plan 2025/2026.
Details were provided on the Resource Plan for 2025/2026, attached as Appendix 1 to the
report, which outlined the:-
 key areas of focus for the year ahead
 Resource outcomes
 measures and actions
 resourcing of the Plan
Following approval at individual Resource Committees, the Resource Plans for 2025/2026
would be submitted, as a pack, to the meeting of the Executive Committee to be held on 25
June 2025 for noting.
The Resource had established a number of outcomes to support the delivery of the Council
Plan, Connect, in 2025/2026. To support those outcomes, the Resource had developed
performance measures in an action plan, detailed in Section 4 of the Resource Plan.  Key or
strategic measures would be included in the Council Plan progress reports 2025/2026, with the
remaining measures being monitored and reported at Resource level.
In line with the Council’s performance management arrangements, a mid-year progress report
on measures identified in the 2025/2026 Community and Enterprise Resource Plan and an end
of year report respectively, would be submitted to future meetings of the Committee.
Once approved, the Resource Plan would be made available on the Council’s website.
Officers responded to members’ questions on various aspects of the report.
7

Page 8

In response to a member’s request to be provided with a copy of the Resource Risk Control
Plan, the Executive Director (Community and Enterprise Resources) gave an undertaking to
liaise with colleagues in Finance and Corporate Resources who had an overarching role for risk.
Councillor Watson referred to the major infrastructure roadworks carried out in East Kilbride and
commended Roads Services on the challenging work undertaken.
The Committee decided:
(1) that the Resource Plan 2025/2026, attached as Appendix 1 to the report, be approved;
(2) that the Resource Plan 2025/2026 be uploaded onto the Council’s website following
consideration by this Committee;
(3) that it be noted that, following Committee approval, all Resource Plans would be submitted
to the Executive Committee on 25 June 2025 for noting; and
(4) that it be noted that Progress Reports on the Resource Plan 2025/2026 would be
submitted, at Quarter 2 and Quarter 4, to future meetings of this Committee.
7 Employability – Annual Investment Plan
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted seeking approval of the Employability Annual Investment Plan 2025/2026 and to
enter into agreements with colleges.
The Council delivered and funded a range of employability programmes designed to help local
residents who experienced barriers to employment to progress to sustainable destinations of
employment or further learning.  Those programmes were funded by a blend of external funding
sources supported by core Council budgets.  External funding for 2025/2026 included the
Scottish Government’s No-one Left Behind Fund, UK Government Shared Prosperity Fund and
windfarm community benefit funding.
The 2025/2026 Plan had been developed in partnership with the South Lanarkshire Local
Employability Partnership (SLLEP) and was attached as an appendix to the report.  It set out the
SLLEP’s key priority groups, keywork-based programmes and learning and training activity.
Foundation Apprenticeships (FAs) were a national senior phase option funded by Skills
Development Scotland (SDS) and the Scottish Funding Council (SFC) and designed to allow
pupils in S5 and S6 to gain valuable work experience and access to work-based learning while
still at school.  Pupils attended college and work placements up to 2 days a week while at
schools and the qualification achieved was delivered at level 6 of the Scottish Credit and
Qualifications Framework (SCQF).
South Lanarkshire’s FA programme was delivered as a partnership between the Council, South
Lanarkshire College and New College Lanarkshire.  The programme was funded through a
blend of SFC credits and the Council’s SDS contract through a consortium agreement.  SDS
had confirmed contract levels for academic year 2025/2026 and approval was sought to develop
a consortium agreement with South Lanarkshire College and New College Lanarkshire for the
delivery of the 2025/2026 programme.
8

Page 9

GradU8 was a work-based learning option available to South Lanarkshire pupils in the senior
phase of secondary school at SCQF level 4 or 5.  The programme was delivered in partnership
with South Lanarkshire College, New College Lanarkshire and Glasgow Kelvin College with
pupils attending one-day a week to engage in one of 12 subject options.  The programme was
supported by a mix of funding which was set out in a partnership agreement between the
Council and each of the colleges.  Approval was sought for the development of partnership
agreements with South Lanarkshire College, New College Lanarkshire and Glasgow Kelvin
College for the delivery of GradU8 for the 2025/2026 academic year.
The Employability Manager responded to a member’s question in relation to links with Social
Work Resources.
The Committee decided:
(1) that the 2025/2026 Annual Investment Plan be approved;
(2) that the development of a consortium agreement with South Lanarkshire College and New
College Lanarkshire for the delivery of the 2025/2026 Foundation Apprenticeship
programme be approved; and
(3) that the development of partnership agreements with South Lanarkshire College, New
College Lanarkshire, and Glasgow Kelvin College for the delivery of GradU8 for the
2025/2026 academic year be approved.
Prior to consideration of this item of business, Councillor Anderson made a transparency statement
to advise that he was a member of the Routes to Work South Board
8 Community Benefit Funds – Renewable Energy Fund - Grant Applications
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on 6 applications to the Renewable Energy Fund (REF).  This community benefit
funding, secured from windfarm developers, had been established to provide funding to suitable
projects providing community benefits in eligible areas.
It was proposed that, subject to the applicants providing written confirmation that all other
additional funding for the projects had been secured, grants be awarded as detailed in the
report.
The Committee decided: that, subject to the applicants providing written confirmation
that all other funding for the projects had been secured, a
grant be awarded of up to a maximum of:-
 £45,865.23 towards eligible costs associated with the
purchase of course maintenance equipment and
storage to Douglas Water Golf Club from Gallawhistle
Windfarm
 £31,050.12 towards eligible costs associated to
employ a development worker within Duneaton to
Duneaton Community Trust from Middle Muir
Windfarm
 £72,635 towards eligible costs associated with
Whitelee Countryside Ranger Service to East
Renfrewshire Council from Whitelee Windfarm
9

Page 10

 £26,060 towards eligible costs associated with the
installation of solar panels and a new heating system
to Glespin Community Group SCIO from Andershaw
Windfarm
 £96,500 towards eligible costs associated with
completing a property purchase to Kirkmuirhill and
Blackwood Men’s Shed from Auchrobert and
Nutberry Windfarms
 £670,769 towards eligible costs associated with the
construction of an indoor training facility to Strathaven
Rugby Football Club Limited from West Brown Castle
Windfarm
[Reference: Minutes of 6 February 2024 (Paragraph 8)]
9 Renewable Energy Fund – New Windfarm Contributions
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the:-
 development of the Kype Muir Extension and Cumberhead wind farm sites
 proposals for the associated community benefit payments from those wind farm sites to be
managed through the Renewable Energy Fund (REF)
As part of the developments, the Council would receive community benefit payments for
distribution to projects associated with the wind farm sites.  It was proposed that the
arrangements in place for the distribution of funds through the existing REFs be used as the
basis for the administration of the Kype Muir Extension and Cumberhead wind farm sites.
The eligible areas were shown in the appendices to the report and the criteria to regulate the
distribution of funds through the REF for the wind farm sites grants were detailed.
The Committee decided: that the Council’s Renewable Energy Fund incorporate
provision for the receipt and disbursement of community
benefit payments in respect of the Kype Muir Extension
and Cumberhead wind farm sites.
10 UK Shared Prosperity Fund 2025/2026
A report dated 29 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on the proposed programme for the UK Shared Prosperity Fund (UKSPF) for
2025/2026.
In 2022, the Council received an allocation of £12,221,811 from the UK Government providing a
mix of capital and revenue funding for projects which met the UKSPF’s 4 investment themes of:-
 communities and places
 support for local business
 people and skills
 multiply
The initial UKSPF ran for 3 financial years from 2022/2023 to 2024/2025.
10

Page 11

In October 2024, the Chancellor confirmed that UKSPF would continue for a Year 4, 2025/2026,
however, with a budget reduction to £900 million.  This was around 40% less than the Year 3
allocation.
Allocations had been adjusted to prioritise areas with the highest levels of deprivation.  Table 3,
at paragraph 4.4. of the report provided details of the confirmed allocations to member
authorities, with South Lanarkshire being allocated a budget of £4 million for 2025/2026, 44%
less than the previous financial year.
Officers had worked across the Council to prepare a proposal which delivered on the Council’s
priorities and this was outlined at paragraph 4.7.
The Committee decided:
(1) that the changes made by the UK Government to the UKSPF be noted; and
(2) that the expenditure profile, as set out in paragraph 4.7 of the report, for 2025/2026 be
approved.
[Reference: Minutes of 26 November 2024 (Paragraph 15) and 29 August 2023 (Paragraph 10)]
11 Community Benefit Funds – 2024/2025 Annual Report
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted on grants awarded in 2024/2025 from the Community Benefit Funds
administered by the Council’s Enterprise and Sustainable Development Services.
Community Benefit Funds had been established to provide funding to suitable projects providing
community benefits in eligible areas.  Details of the grants awarded in 2024/2025 were provided
in appendices 1 to 5 to the report.
A publicity document for 2024/2025 would be prepared with the purpose of raising awareness of
the Community Benefit Funds and their support of communities.  This annual report would be
circulated and publicised digitally, with copies made available to councillors and groups.
Officers responded to a member’s question in terms of the total value of Community Benefit
Funds.  It was noted that this figure varied on a daily basis, however, a total at the year end, 31
March 2025 could be provided.
The Committee decided: that the Community Benefit Funds administered by the
Council and the grants awarded under the Renewable
Energy Fund (REF), Clyde Wind Farm Fund (CWFF) and
Quarry Funds in 2024/2025 be noted.
[Reference:  Minutes of 17 September 2024 (Paragraph 15)]
12 Larkhall Leisure Centre Progress Update
A report dated 23 April 2025 by the Executive Director (Community and Enterprise Resources)
was submitted providing an update on the progress of the replacement of Larkhall Leisure
Centre.
At its meeting in February 2024, the Council approved an additional £12 million to bridge the
funding gap for the replacement of Larkhall Leisure Centre.  This brought the total available
funding at that time to £23.9 million, which enabled the project to progress.
11

Page 12

Community engagement drop-in sessions to review the draft plans were held over several
dates.  All sessions had been well attended with strong support for the swimming pool, gym and
fitness suite design, however, negative feedback had been received in relation to the lack of
games hall within the proposed plans.
In February 2025, the Council approved an additional £3.85 million towards the replacement
project in order to increase the games hall provision within the new facility.  The total budget for
the project now stood at £27.750 million. 
The design team was currently re-developing the plans for the new centre which would include:-
 a 3 court games hall suitable for badminton, pickleball and 5-aside football
 a 25m 6 lane swimming pool with moveable floor, spectators’ area, steam room and sauna
 a gym to accommodate high specification cardiovascular and resistance equipment, and
free weight training areas
 a flexible fitness studio/community space with adjoining tea preparation area
The project was due to commence in autumn 2025, with an indicative completion date of
October 2027, however, the recent change to the project scope had delayed the programme by
approximately 7 months and it was anticipated that it would complete in May 2028.
Councillors Clark and Carmichael, as ward members, welcomed the report.
The Committee decided: that the changes to the project scope and programme,
following the budget decision to invest an additional
£3.85 million to increase games hall provision in the new
facility be noted.
[Reference: Minutes of 26 November 2024 (Paragraph 12)] and Minutes of South Lanarkshire
Council of 21 February 2024 (Paragraph 2) and 26 February 2025 (Paragraph 2)]
13 Urgent Business
There were no items of urgent business.
12

Page 13

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 31 March 2025 for Community and Enterprise
Resources 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the position to 31 March 2025 of a breakeven position after approved
transfer to reserves as detailed in Appendix A of the report be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the final revenue budget monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2024/2025. 
3.2. The report details the yearend position for Community and Enterprise Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and appendices B to G provides the detailed financial
position with variance explanations by budget category. 
3.3. This report reflects the actual spend to 31 March 2025.   
4. Employee Implications
4.1. None.   
5. Financial Implications
5.1. As at 31 March 2025, the actual outturn position for 2024/2025 is an underspend of
£0.617 million before approved transfers to reserves.  This is outlined in the attached
appendices.  This position has been reported and approved as part of the overall
Council final position for 2024/2025 reported to Executive Committee on 25 June
2025.    
3
13

Page 14

5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however these are mitigated by additional funds being added to the
budget. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director, (Community and Enterprise Resources) 
25 June 2025 
Link(s) to Council Values/Priorities/Objectives
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 31 March 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Louise Harvey, Finance Manager
Ext:  2658 (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
14

Page 15

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 14 Ended 31 March 2025 (No. 14) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
£m
Year End
Actual
£m
Variance
£m %
Facilities, Waste and Grounds Services 81,141 80,566 575 0.7%
Planning and Regulatory Services 4,904 4,359 545 11.1%
Leisure Services 21,747 21,714 33 0.2%
Enterprise and Sustainable Development 3,899 3,632 267 6.8%
Roads, Transportation and Fleet Services 17,627 18,430 (803) (4.6%)
Net Controllable Exp. 129,318 128,701 617 0.05% 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The underspend is mainly due to turnover and staff vacancies. These were partially offset by overspends
within Property on rates, and cleaning and janitorial equipment along with Payment to contractors for
the upkeep of the crematorium. The Service underspend is offsetting overspends within the overall
Resource.
Planning and
Regulatory Services
The underspend is mainly due to staff vacancies and turnover within the Environmental Services and
Planning & Building Standards teams. In addition, there is an over recovery of income from Planning
applications. The Service underspend is offsetting overspends within the overall Resource.   
Leisure Services No significant variances to report.
Enterprise and
Sustainable
Development
The underspend is mainly due to staff vacancies and turnover within the Economic Development and
Support teams. The Service underspend is offsetting overspends within the overall Resource.     
Roads,
Transportation and
Fleet Services
The overspend across the service, is mainly due to the net costs of Electric vehicles, reduced income
within Parking and the Roads Construction Unit and increased costs associated with the upkeep of
depots. These overspends are partially offset by an underspend within employee costs due to vacancies
and staff turnover.  The Service overspend is managed within the overall Resource position.   
15

Page 16

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 31 March 2025 (No.14) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 99,455 95,309 4,146 95,380 4,075 Under 4.1% 
Property Costs 10,471 11,288 (817) 11,435 (964) Over (9.2%) 
Supplies & Services 20,947 20,883 64 20,143 804 Under 3.8% 
Transport & Plant 23,612 24,009 (397) 24,091 (479) Over (2.0%) 
Administration Costs 1,043 1,156 (113) 1,269 (226) Over (21.7%) 
Payments to Other Bodies 25,476 25,456 20 25,856 (380) Over (1.5%) 
Payments to Contractors 36,323 37,522 (1,199) 38,857 (2,534) Over (7.0%) 
Transfer Payments 617 617 0 611 6 Under 0.0% 
Financing Charges 209 201 8 228 (19) Over (9.1%) 
Total Controllable Exp. 218,153 216,441 1,712 217,870 283 Under 0.1% 
Total Controllable Inc. (88,835) (87,163) (1,672) (89,169) 334 Over
recovered 0.4% 
Net Controllable Exp. 129,318 129,278 40 128,701 617 Under 0.5% 
Transfer to Reserves - 40 (40) 617 (617)   
Position after Transfer to 
Reserves 129,318 129,318 0 129,318 0 - 0.0% 
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
Approved Transfers to Reserves 
Detailed in Appendix C-G as appropriate.   
16

Page 17

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 62,458 60,539 1,919 60,582 1,876 Under 3.0% 1,c 
Property Costs 2,287 2,747 (460) 2,872 (585) Over (25.6%) 2 
Supplies & Services 10,652 10,830 (178) 10,815 (163) Over (1.5%) 3,a 
Transport & Plant 9,042 9,270 (228) 8,860 182 Under 2.0% 4 
Administration Costs 181 222 (41) 311 (130) Over (71.8%) 5 
Payments to Other Bodies 333 330 3 324 9 Under 2.7% d 
Payments to Contractors 17,626 17,677 (51) 18,285 (659) Over (3.7%) 6,a,b 
Transfer Payments 0 0 0 0 0 - n/a 
Financing Charges 45 50 (5) 54 (9) Over (20.0%) 
Total Controllable Exp. 102,624 101,665 959 102,103 521 Under 0.5% 
Total Controllable Inc. (21,483) (20,937) (546) (21,537) 54 Over
Recovered 0.3% 7,d 
Net Controllable Exp. 81,141 80,728 413 80,566 575 Under 0.7% 
Transfer to Reserves - - - 395 (395)   i,ii 
Position after Transfer to 
Reserves 81,141 80,728 413 80,961 180 Under 0.2% 
Variance Explanations
1. The variance relates to vacancies and staff turnover throughout the service and is partially offset by an overspend in overtime costs.
2. The overspend is due to increased costs for cleaning and janitorial equipment within Facilities and for rates at the former Civic
Amenity Site at Muttonhole Road.
3. The overspend is mainly due to spend on purchase and repairs of equipment within Facilities Management, higher than budgeted
costs for domestic waste and recyclate bins within Waste services and general materials under Grounds. The overspend is partially
offset by an underspend within supplies and services and food purchases within Facilities.
4. The underspend is mainly due to less than anticipated costs within Grounds on leasing, casual hire and other transport costs.  
5. The overspend relates to greater costs in respect of medical referrals throughout the Service, printing of communication materials
within Facilities and training costs within the Grounds service.  
6. The overspend is mainly due to higher that anticipated costs on the upkeep of the Crematorium.
7. The over recovery in income is mainly due to the net effect of greater income from clearances and uplifts within Waste services,
service movements within Facilities, partially offset by less demand for bereavement services and school meal income, and additional
service requests within Street Cleansing, a decrease in uptake of the Care of Gardens service. 
Budget Virements
a. Realignment of budget to reflect service delivery on yearend budget activity within Waste. Net effect £0.000m: Supplies and Services
£0.235m, Payment to Contractors (£0.235m).
b. Carry forward of committed budget in respect of Strategic Waste Fund within Waste. Net effect (£0.518m): Payment to contractors
(£0.518m).
c. Transfer of budget in relation to apprenticeship levy. Net effect £0.265m: Employees £0.265m.
d. Establish budget for non-capital spend. Net effect £0.000m: Payment to Other Bodies £0.280m, Income (£0.280m). 
Transfer to Reserves (£0.395m):
i. To cover storm damage within the Grounds Service (£0.265m)
ii. To cover play equipment within Amenity Service (£0.130m)  
17

Page 18

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Planning and Regulatory Services 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 7,389 7,095 294 7,087 302 Under 4.1% 1,b 
Property Costs 198 193 5 180 18 Under 9.1% a 
Supplies & Services 208 205 3 216 (8) Over (3.8%) 
Transport & Plant 127 102 25 117 10 Under 7.9% 
Administration Costs 143 182 (39) 206 (63) Over (44.1%) 2,a 
Payments to Other Bodies 7,861 7,810 51 7,790 71 Under 0.9% 3,a,c 
Payments to Contractors 796 779 17 752 44 Under 5.5% 4,a 
Transfer Payments 0 0 0 0 0 - n/a 
Financing Charges 46 30 16 35 11 Under 23.9% 
Total Controllable Exp. 16,768 16,396 372 16,383 385 Under 2.3% 
Total Controllable Inc. (11,864) (12,032) 168 (12,024) 160 Over
recovered 1.3% 5,a,c 
Net Controllable Exp. 4,904 4,364 540 4,359 545 Under 11.1% 
Transfer to Reserves - - - - -   
Position after Transfer to 
Reserves 4,904 4,364 540 4,359 545 Under 11.1% 
Variance Explanations
1. The underspend is due to staff vacancies and turnover.
2. The overspend is due to legal costs on two Environmental services cases and additional specialised training within this service.
3. The underspend relates to less spend associated with the Local Plan.
4. The underspend is due to the temporary suspension of stray dog kennelling and lower demand of pest control within Environmental. 
5. The over recovery is due to a greater level of income from Planning applications. 
Budget Virements
a. Realignment of budget to reflect service delivery within Air Quality Projects, Planning and Environmental Services. Net effect
£0.000m: Property £0.160m, Administration £0.009m, Payment to Other Bodies (£0.034m), Payment to Contractor (£0.015m),
Income (0.120m).
b. Transfer of budget in relation to apprenticeship levy. Net effect £0.029m: Employees £0.029m.
c. Establish budget for non-capital spend. Net effect £0.000m: Payment to Other Bodies £7.455m, Income (£7.455m). 
18

Page 19

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 4 4 0 6 (2) Over (50.0%) 
Property Costs 5,638 5,638 0 5,663 (25) Over (0.4%) 1,a 
Supplies & Services 0 0 0 0 0 - n/a 
Transport & Plant 0 0 0 0 0 - n/a 
Administration Costs 8 8 0 10 (2) Over (25.0%) 
Payments to Other Bodies 80 92 (12) 93 (13) Over (16.3%) 2 
Payments to Contractors 16,031 16,031 0 15,978 53 Under 0.3% 3 
Transfer Payments 0 0 0 0 0 - n/a 
Financing Charges 0 0 0 0 0 - n/a 
Total Controllable Exp. 21,761 21,773 (12) 21,750 11 Under 0.1% 
Total Controllable Inc. (14) (14) 0 (36) 22 Over
recovered 157.1% 4,a 
Net Controllable Exp. 21,747 21,759 (12) 27,714 33 Under 0.2% 
Transfer to Reserves - - - 52 (52)   iii 
Position after Transfer to 
Reserves 21,747 21,759 (12) 27,766 (19) Over (0.1%) 
Variance Explanations
1. The overspend relates to the costs associated with vacant properties.
2. The overspend relates to the annual fireworks display at Strathclyde Park.
3. The underspend relates to less spend on the Community Fight Back fund which is carried forward for 2025/2026 commitments.  
4. The over recovery is mainly due to rental income associated with halls. 
Budget Virements
a. Realignment of budget to reflect service delivery within Leisure. Net effect £0.000m: Property Costs £0.014m, Income (£0.014m). 
Transfer to Reserves (£0.052m):
iii. Carry forward of committed monies for the Community Fight Fund (£0.052m) 
19

Page 20

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 8,379 8,060 319 8,132 247 Under 2.9% 1,b,c,d 
Property Costs 582 592 (10) 559 23 Under 4.0% 2 
Supplies & Services 144 123 21 148 (4) Over (2.8%) 
Transport & Plant 166 167 (1) 166 0 - 0.0% c 
Administration Costs 313 283 30 303 10 Under 3.2% c 
Payments to Other Bodies 11,328 11,260 68 11,316 12 Under 0.1% a,b,c 
Payments to Contractors 317 376 (59) 336 (19) Over (6.0%) b,c 
Transfer Payments 0 0 0 0 0 - n/a 
Financing Charges 68 57 11 81 (13) Over (19.1%) 
Total Controllable Exp. 21,297 20,918 379 21,041 256 Under 1.2% 
Total Controllable Inc. (17,398) (17,386) (12) (17,409) 11 Over
recovered 0.1% b,c 
Net Controllable Exp. 3,899 3,532 367 3,632 267 Under 6.8% 
Transfer to Reserves - - 0     
Position after Transfer to 
Reserves 3,899 3,532 367 3,632 267 Under 6.8% 
Variance Explanations
1. The underspend is mainly due to staff turnover within Economic Development and Support Administration.
2. The underspend is mainly due to less costs for repairs and maintenance throughout the service. 
Budget Virements
a. Transfer of budget for capital funded from revenue in respect of Shared Prosperity. Net effect (£2.260m): Payment to Other Bodies
(£2.260m).
b. Carry forward of committed budget associated with strategic investments in respect of Climate Investment and Food Development
Officer, Get South Lanarkshire Working and Shared Prosperity. Net effect (£0.566m): Employees (£0.218m), Payment to Other
Bodies (£0.341m), Payment to Contractors (£0.007m).
c. Realignment of budget to reflect service delivery on yearend budget activity in Economic Development.  Net effect £0.000m:
Employees (£0.160m), Transport and Plant (£0.170m), Administration £0.160m, Payment to Other Bodies £0.454m, Payment to
Contractors (£0.320m), Income £0.036m.
d. Transfer of budget in relation to apprenticeship levy. Net effect £0.033m: Employees £0.033m. 
20

Page 21

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
£m 
Forecast
for Year
£m
Forecast
Variance
£m
YTD
Actual
(£000)
YTD
Variance
Under/
(Over) %  Note 
Employee Costs 21,225 19,611 1,614 19,573 1,652 Under 7.8% 1,b 
Property Costs 1,766 2,118 (352) 2,161 (395) Over (22.4%) 2 
Supplies & Services 9,943 9,725 218 8,964 979 Under 9.8% 3 
Transport & Plant 14,277 14,470 (193) 14,948 (671) Over (4.7%) 4 
Administration Costs 398 461 (63) 439 (41) Over (10.3%) 5 
Payments to Other Bodies 5,874 5,964 (90) 6,333 (459) Over (7.8%) 6 
Payments to Contractors 1,553 2,659 (1,106) 3,506 (1,953) Over (125.8%) 7,a 
Transfer Payments 617 617 0 611 6 Under 0.0% 
Financing Charges 50 64 (14) 58 (8) Over (16.0%) 
Total Controllable Exp. 55,703 55,689 14 56,593 (890) Over (1.6%) 
Total Controllable Inc. (38,076) (36,794) (1,282) (38,163) 87 Over
recovered 0.2% a 
Net Controllable Exp. 17,627 18,895 (1,268) 18,430 (803) Under (4.6%) 
Transfer to Reserves - 40 (40) 170 (170)   iv,v,vi 
Position after Transfer to 
Reserves 17,627 18,935 (1,308) 18,600 (973) Over (5.5%) 
Variance Explanations
1. The underspend is mainly due to vacancies and staff turnover.
2. The overspend reflects higher than budgeted costs for water and repairs & maintenance for Roads’ depots and higher cost of
electrical power for the charging of electrical vehicles.
3. The underspend is due to less spend on materials within Roads Construction due to type of works.  
4. The overspend is partly due to greater expenditure on fuel and casual hire within Fleet and are recovered through additional income.
Additionally, there are higher than budgeted costs for outside repairs, materials and tyres within Fleet. The overspends are partially
offset by an underspend on vehicle hires within the Roads Construction Unit
5. The overspend relates to cost of medical referrals and training costs within Roads.
6. The overspend relates to payments for winter weather forecasts being greater than budget. 
7. The overspend is mainly due to higher than budgeted costs for bridge repairs and statutory inspections and payments to the Roads
Construction Unit in respect of roads and lighting routine maintenance. In addition, winter maintenance costs were greater than
budget.
8. Income is over recovered due to area income, rechargeable street lighting works and inspection fees all within Roads, and within
Fleet there are over recoveries in relation to routine maintenance, taxi inspections and sale of vehicles. These are partially offset by
lower than budgeted income from Parking and electrical vehicle recharging within Roads, and less income from maintenance works
within Roads Construction Unit. Within Fleet there is an under recovery in the leasing Management fee and pool cars. 
Budget Virements
a. Budget realignment to reflect revenue works completed by the Construction Unit for Roads General Services because of the change
to Trading Services. Net effect £0.000m: Payment to Contractors (£2.081m), Income £2.081m.
b. Transfer of budget in relation to apprenticeship levy. Net effect £0.084m: Employees £0.084m. 
Transfer to Reserves (£0.170m):
iv. Fleet Sinking Fund contribution (£0.025m)
v. Year 3 of 4 of Electric Vehicle Payback (£0.015m)
vi. To cover storm damage within the roads Service (0.130m)
21

Page 22

22

Page 23

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 16 May 2025 for Community and Enterprise
Resources
 provide a forecast for the year to 31 March 2026 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the forecast to 31 March 2026 of a breakeven position as detailed in
Appendix A of the report be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the first revenue budget monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2025/2026. 
3.2. The report details the financial position for Community and Enterprise Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and appendices B to G provides the detailed financial
position with variance explanations by budget category. 
3.3. This report reflects the actual spend to 16 May 2025 within the Resource budget and
reflects the expected outturn forecast on expenditure and income at this date.   
4. Employee Implications
4.1. None.   
5. Financial Implications
5.1. As at 16 May 2025, the Resource’s projected outturn position for 2025/2026 is a
breakeven position.  This is outlined in the attached appendices.    
4
23

Page 24

5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however these are mitigated by additional funds being added to the
budget. 
7.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate.   
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director, (Community and Enterprise Resources) 
25 June 2025 
Link(s) to Council Values/Priorities/Objectives
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 16 May 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Louise Harvey, Finance Manager
Ext:  2658 (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
24

Page 25

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 2 Ended 16 May 2026 (No. 2) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Facilities, Waste and Grounds Services 79,114 79,061 53 0.07% 5,063
Planning and Regulatory Services 4,786 4,839 (53) (1.11%) 463
Leisure Services 19,788 19,788 0 0.00% 28
Enterprise and Sustainable Development 5,824 5,824 0 0.00% 705
Roads, Transportation and Fleet Services 18,169 18,169 0 0.00% 3,576
Net Controllable Exp. 127,681 127,681 0 0.00% 9,835 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by overspends
within Property on rates, and an under recovery within Private Care of Garden income.  The anticipated
Service underspend will be offset by overspends within the overall Resource. 
Planning and
Regulatory Services
The anticipated overspend reflects a reduced level of income from Planning applications and Building
Warrants at this early stage of the year, and is partially offset by staff vacancies and turnover within
Environmental Services and Planning & Building Standards. This overspend will be managed across
the Resource. 
Leisure Services No significant variances to report.
Enterprise and
Sustainable
Development
No significant variances to report.
Roads,
Transportation and
Fleet Services
The overall service budget is balanced.  Noted overspends in Computer Licences within Roads and less
than budgeted income for Parking and Electrical Vehicles is offset by an underspend in employee costs
due to staff vacancies and turnover within Roads. 
25

Page 26

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 100,127 99,513 614 Under 0.61% 10,010 
Property Costs 8,924 9,058 (134) Over (1.5%) 206 
Supplies & Services 18,199 18,280 (81) Over (0.45%) 1,090 
Transport & Plant 22,818 22,821 (3) Over (0.01%) 3,234 
Administration Costs 928 931 (3) Over (0.32%) 78 
Payments to Other Bodies 14,885 14,885 0 - 0.00% 1,483 
Payments to Contractors 38,756 38,786 (30) Over (0.08%) 2,174 
Transfer Payments 617 617 0 - 0.00% 156 
Financing Charges 192 192 0 - 0.00% 0 
Total Controllable Exp. 205,446 205,083 363 Under 0.18% 18,431 
Total Controllable Inc. (77,765) (77,402) (363) Under (0.47%) (8,596) 
Net Controllable Exp. 127,681 127,681 0 - 0.00% 9,835 
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
26

Page 27

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 63,207 62,962 245 Under 0.39% 6,414 1,a,b
Property Costs 2,309 2,448  (139)  Over (6.02%) 82 2,a
Supplies & Services 9,288 9,310 (22) Over (0.24%) 555 3,a,b
Transport & Plant 8,147 8,148 (1) Over (0.01%) 1,761 b
Administration Costs 298 301 (3) Over (1.01%) 20 a,b
Payments to Other Bodies 54 54 0 - 0.00% 37 
Payments to Contractors 19,614 19,614 0 - 0.00% 2,044 b
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 45 45 0 - 0.00% 0 
Total Controllable Exp. 102,962 102,882 80 Under 0.08% 10,913 
Total Controllable Inc. (23,848) (23,821) (27) Under 0.11% (5,850) 4,a,b
Net Controllable Exp. 79,114 79,061 53 Under 0.07% 5,063 
Variance Explanations 
1. The forecast underspend in Facilities, Waste and Amenity is due to staff turnover and is partially offset by an overspend in Waste
services due to overtime costs.
2. The forecast overspend is due to price increases for cleaning and janitorial equipment within Facilities and an overspend on rates
within Waste due to the removal of rates relief for property at Muttonhole Road.
3. The forecast overspend is due to higher than budgeted costs for the purchase and repair of equipment within Facilities.  
4. The forecast under recovery is mainly due to reduced demand for the Private Care of Gardens service within Grounds. 
Budget Virements 
a. Realignment of budget to reflect service provision within Facilities for school meals. Net effect £0.000m: Employees £0.056m,
Property £0.190m, Supplies and Services (£0.546m), Administration £0.020m, Income £0.280m.
b. Establishment of temporary budgets in respect of investment monies. Net Effect £0.000m: Employees £0.795m, Supplies and
Services £0.425m, Administration £0.050m, Payment to Contractor £0.600m, Income (£1.900m). 
27

Page 28

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
Planning and Regulatory Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7,319 7,265 54 Under 0.74% 748 1
Property Costs 38 24 14 Under 36.84% 0 2
Supplies & Services 160 170 (10) Over (6.25%) 92 
Transport & Plant 127 127 0 - 0.00% 4 
Administration Costs 111 111 0 - 0.00% 18 
Payments to Other Bodies 235 235 0 - 0.00% 28 
Payments to Contractors 443 473 (30) Over (6.77%) 36 3
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 46 46 0 - 0.00% 0 
Total Controllable Exp. 8,479 8,451 28 Under 0.33% 926 
Total Controllable Inc. (3,693) (3,612) (81) Under (2.19%) (463) 4
Net Controllable Exp. 4,786 4,839 (53) Over (1.11%) 463 
Variance Explanations 
1. The forecast underspend is due to staff vacancies and turnover.
2. The anticipated underspend is due to less than budgeted repair costs within Planning.
3. The anticipated overspend is due to increased contract costs for provision of stray dog kennelling within Environmental Services.
4. The forecast under recovery reflects the early position on income from Planning applications and Building warrants, and will continue
to be monitored through the year.   
Budget Virements  
No budget Virements 
28

Page 29

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 4 4 0 - 0.00% 0 
Property Costs 4,615 4,615 0 - 0.00% 25 
Supplies & Services 0 0 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 8 8 0 - 0.00% 3 
Payments to Other Bodies 80 80 0 - 0.00% 0 
Payments to Contractors 15,081 15,081 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 0 0 0 - 0.00% 0 
Total Controllable Exp. 19,788 19,788 0 - 0.00% 28 
Total Controllable Inc. 0 0 0 - 0.00% 0 
Net Controllable Exp. 19,788 19,788 0 - 0.00% 28 
Variance Explanations 
No variances to report. 
Budget Virements 
No budget virements 
29

Page 30

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 9,123 9,123 0 - 0.00% 834 a,b
Property Costs 262 262 0 - 0.00% 3 b
Supplies & Services 146 146 0 - 0.00% 0 b
Transport & Plant 353 353 0 - 0.00% 1 b
Administration Costs 113 113 0 - 0.00% 7 b
Payments to Other Bodies 9,038 9,038 0 - 0.00% 34 b
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 51 51 0 - 0.00% 0 b
Total Controllable Exp. 19,086 19,086 0 - 0.00% 879 
Total Controllable Inc. (13,262) (13,262) 0 - 0.00% (174) a,b
Net Controllable Exp. 5,824 5,824 0 - 0.00% 705 
Variance Explanations 
No variances to report. 
Budget Virements 
a. Realignment of budget within Economic Development in relation to Shared Prosperity budgets.  Net Effect £0.000m: Employees
(£0.202m), Income £0.202m. 
b. Establishment of temporary budgets within Economic Development in respect of Employability, Shared Prosperity and Business
Support. Net Effect £0.000m: Employees £3.716m, Property Costs £0.016m, Supplies and Services £0.001m, Transport and Plant
£0.174m, Administration £0.012m, Payment to Other Bodies £8.809m, Financing Charges (£0.005m), Income (£12.723m). 
30

Page 31

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 16 May 2025 (No.2) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 20,474 20,159 315 Under 1.54% 2,014 1,a
Property Costs 1,700 1,709 (9) Over (0.53%) 96 2
Supplies & Services 8,605 8,654 (49) Over (0.57%) 443 3,a
Transport & Plant 14,191 14,193 (2) Over (0.01%) 1,468 a
Administration Costs 398 398 0 - 0.00% 30 
Payments to Other Bodies 5,478 5,478 0 - 0.00% 1,384 
Payments to Contractors 3,618 3,618 0 - 0.00% 94 
Transfer Payments 617 617 0 - 0.00% 156 
Financing Charges 50 50 0 - 0.00% 0 
Total Controllable Exp. 55,131 54,876 255 Under 0.46% 5,685 
Total Controllable Inc. (36,962) (36,707) (255) Under (0.69%) (2,109) 4,a
Net Controllable Exp. 18,169 18,169 0 - 0.00% 3,576 
Variance Explanations 
1. The forecast underspend is due to vacancies and staff turnover.
2. The forecast overspend is due to higher than budgeted costs for water and repairs for Roads’ depots.
3. The forecast overspend mainly relates to increased costs for annual subscriptions for computer licences within Roads.
4. The anticipated under recovery is due to less than budgeted income for parking & electric vehicles within Roads. 
Budget Virements 
a. Realignment of budget within Fleet for outside repairs and Roads Construction to reflect service delivery. Net Effect £0.000m:
Employees (£1.500m), Supplies and Services (£0.850m), Transport and Plant £0.700m, Income £1.650m. 
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Community and Enterprise Resource Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April 2024 to 31 March 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources’ capital programme of £47.364
million, and expenditure for the year of £35.448 million be noted. 
[1recs]
3. Background
3.1. This is the final capital monitoring report presented to the Community and Enterprise
Resources Committee for the financial year 2024/2025.   
3.2. As noted in the last report to this Committee 13 May 2025, the budget for Community
and Enterprise Resources for financial year 2024/2025 was £47.364 million.  This was
the final budget for the year 2024/2025. 
3.3. The report details the year-end position for Community and Enterprise Resources in
Appendix A.   
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. 2024/2025 Capital Programme – Final Position 
5.1. As detailed in Section 3.2, the total capital programme for Community and Enterprise
Resources for 2024/2025 was £47.364 million. Total expenditure to the 31 March 2025
was £35.448 million, a difference of £11.916 million in comparison to the programme
of £47.364 million.   
5.2. This year-end underspend position reflects the profile of spend across a number of
projects including within the multi-project and multi-year programme Leisure and
Culture Transformation Fund where spend will be incurred in the new financial year.   
5
33

Page 34

5.3. For the City Deal – Greenhills Road project, ongoing maintenance spend will be
incurred in future financial years and in relation to Hamilton Town Centre Masterplan,
spend is now aligned with the allocated investment funding. 
5.4. Overall, the programme underspend reflects the timing of spend across financial
years.  The main projects responsible for the overall programme underspend are
detailed in Appendix B.  This appendix provides a list of the continuing projects into
2025/2026, along with their estimated completion dates.  
5.5. Any underspend on these projects, along with the funding, will carry forward into next
financial year as required.  An update on the 2025/2026 programme is detailed in a
separate report to this Committee.     
5.6. Accounting Adjustments While sections 5.1 to 5.3 detail the position on the Capital
Programme as set, Accounting Regulations mean that adjustments are required to
report spend correctly as either Capital or Revenue for the purposes of publishing our
Annual Accounts.  This includes where spend is in relation to assets that are not owned
by the Council and where the spend must be classed as Revenue.  There is no
operational impact for projects from this adjustment – it is an accounting entry only.   
5.7. At the year-end 2024/2025, £8.423 million of capital spend is required to be recorded
as revenue spend.  The transfer above means that for the purpose of publishing our
Annual Accounts only, there is Capital spend of £27.025 million.    
6. Financial Implications
6.1. The financial implications are detailed in section 4 of this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1.  There are no implications for climate change, sustainability or the environment in 
terms of the information contained in this report. 
8. Other Implications
8.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of an overspend
is managed through four weekly Investment Management Meetings. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
9.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
14 July 2025 
34

Page 35

Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Community and Enterprise Resources Committee, 13 May 2025
 Executive Committee, 25 June 2025 
List of Background Papers
 Financial ledger to 31 March 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel: 01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk 
35

Page 36

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024 - 2025
Community and Enterprise Resources Programme
For Period 1 April 2024 – 31 March 2025 
Community and
Enterprise Resources
Base
Budget 
£000
Budget
Adjustments
£000 
Slippage
£000
Total
Budget
£000
Actual
Expenditure
£000 
Facilities, Waste and
Grounds
2,846 252 - 3,098 2,246 
Enterprise and Sustainable
Development
28,558 8,097 (13,886) 22,769 14,182 
Roads, Transport and
Fleet
19,170 4,181 (1,854) 21,497 19,020 
TOTAL 50,574 12,530 (15,740) 47,364 35,448 
Accounting Adjustments     
Less Transfers to Revenue     (8,423)  
2024/25 Outturn Position
(Accounting Basis Only)    
27,025       
36

Page 37

Appendix B 
Projects with Underspends in 2024/2025 
which will Carry Forward into 2025/2026
Project Name Project Type Completion Date
Community and Enterprise Resources   
Leisure and Culture Transformation Fund Refurbishment Throughout 2025/26
Lanark Library  Refurbishment September 2025
McKirdy Park Pitches  Refurbishment July 2025
Priory Changing Pavilion, Blantyre  Refurbishment March 2026
Springhall Community Centre – Upgrade  Refurbishment September 2025
Three Rivers / Clydesdale Way Infrastructure Throughout 2025/26
and beyond
White Bridge Replacement, Chatelherault Country
Park 
Infrastructure March 2026
Shawfield Remediation and Development  Regeneration October 2026
SLC Industrial Infrastructure – Energy Efficiency
(Cathcart Road) 
Regeneration July 2026
Carnwath Community and Business Enterprise
HUB
Regeneration October 2025
Place Based Investment Fund Regeneration September 2025
Civic Centre/EK Town Centre Masterplan  Regeneration Throughout 2025/26
and beyond
Hamilton Town Centre Masterplan  Regeneration Throughout 2025/26
and beyond
Vacant & Derelict Land  Regeneration Throughout 2025/26
and beyond
Hamilton Junctions Improvement  Infrastructure Main element of project
now in 2026/2027
Roads Investment Programme  Infrastructure Throughout 2025/26 
Roads – Infrastructure and Related Works Infrastructure Throughout 2025/26
and beyond
City Deal – Stewartfield Way Infrastructure Throughout 2025/26
and beyond 
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April to 16 May 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation:-
[recs]
(1) that the Community and Enterprise Resources’ capital programme of £50.793
million, and expenditure to date of £0.181 million, be noted.
[1recs]
3. Background
3.1. This is the first capital monitoring report presented to the Community and Enterprise
Resources Committee for the financial year 2025/2026. Further reports will follow
throughout the year. 
3.2. The budget of £50.793 million for Community and Enterprise Resources is based on
the overall Capital Programme for 2025/2026 approved by the Executive Committee
on 26 February 2025, updated to include the budget carried forward from 2024/2025,
and adjustments to the programme approved at the Executive Committee on 25 June
2025.  These adjustments totalled a net increase of £3.118 million. 
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2025/2026 Budget   
As detailed in Section 3.2, the revised capital programme for Community and
Enterprise Resources is £50.793 million.  This budget is based on the original
programme of projects approved by the Council in February 2025, updated to include
budget carried forward from financial year 2024/2025 and adjustments approved at
Executive Committee in June 2025 totalling a net increase of £3.118 million.  The
details of these amendments are shown in Appendix A.
6
39

Page 40

5.2. Based on current information, the budget of £50.793 million also reflects the estimated
level of spend which can be achieved in 2025/2026. 
5.3. 2025/2026 Forecast   
Appendix A shows a forecast for the financial year of £50.793 million. For information,
actual expenditure to 16 May 2025 is £0.181 million. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.   
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
14 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 South Lanarkshire Council, 26 February 2025
 Executive Committee, 25 June 2025 
List of Background Papers
 Financial ledger to 16 May 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
40

Page 41

Appendix A 
South Lanarkshire Council
Capital Expenditure 2025-2026
Community and Enterprise Resources Programme
For Period 1 April 2025 – 16 May 2025 
Community and Enterprise
Resources Base Budget 
£000
Budget
Adjustments
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000 
Facilities, Waste and Grounds  3,124  -  -  3,124  3,124  -  42 
Enterprise and Sustainable
Development 
24,062  401  -  24,463  24,463  -  139 
Roads, Transport and Fleet  20,489  2,717  -  23,206  23,206  -  - 
TOTAL  47,675  3,118  -  50,793  50,793  -  181    
For Information Only  
Budget Adjustments approved by Executive Committee, 25 June 2025: 
Budget Adjustments 
Alexander Hamilton Memorial Fountain – Renewable Energy Fund (REF)
Transformation Fund – Eastfield Lifestyles (budget realignment)
McKirdy Park Pitches – Renewable Energy Fund (REF)
Clyde Cycle Park
Hairmyres – City Deal
SPT – Lanark Interchange and Park and Ride 
Total Budget Adjustments             
£0.047m
-
£0.154m
£0.200m
£2.017m
£0.700m 
£3.118m   
41

Page 42

42

Page 43

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – 1 March to 31 May 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for 1 March to 31 May 2025 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for 1 March to 31 May 2025 relating
to Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 8 March 2025 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee. This report for Community and
Enterprise Resources provides information on the position for 1 March to 31 May
2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of May 2025 for
Community and Enterprise Resources. 
The Resource absence figure for May 2025 was 6.6%, this figure remains
unchanged when compared to the previous month and is 1.0% higher than the
Council-wide figure. When compared to May 2024, the Resource absence figure has
increased by 0.7%.
7
43

Page 44

Based on the absence figures at May 2025 and annual trends, the projected annual
average absence for the Resource for 2024/2025 is 6.7%, compared to a Council-
wide average figure of 6.0%. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 329 referrals were made this period. This
represents an increase of 9 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2)
There were 34 accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 39 disciplinary hearings were held within the Resource, this is an
increase of 20 when compared to the same period last year.  No appeals were heard
by the Resource which remains unchanged when compared to the same period last
year. Three grievances were raised within the Resource, this figure has increased by
2 when compared to the same period last year. One Dignity at Work complaint was
raised within the Resource, this figure has increased by 1 when compared to the
same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 30 leavers this period eligible for an exit interview. The number
of leavers has decreased by 14, when compared with the same period last year.
During the period 6 exit interviews were conducted, this figure has decreased by 2
when compared to the same period last year. 
5. Staffing Watch (Appendix 3)
5.1. There has been a decrease of 36 employees in post from 14 December 2024 to 8
March 2025.   
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report.
44

Page 45

10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
12 June 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 13 May 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
45

Page 46

2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
2023 /
2024
2024 /
2025
2025 /
2026
% % % % % % % % % % % %
April 3.6 3.2 3.5 April 6.3 6.8 7.2 April 6.0 6.3 6.6 April 5.1 5.2 5.7
May 3.7 3.1 2.6 May 6.3 6.3 7.4 May 5.9 5.9 6.6 May 5.1 5.3 5.6
June 4.3 4.1 June 5.9 6.4 June 5.7 6.0 June 4.7 5.2
July 2.3 3.8 July 4.6 4.5 July 4.3 4.4 July 3.8 4.1
August 3.0 3.4 August 5.2 6.2 August 4.9 5.7 August 4.1 4.7
September 2.5 3.8 September 7.1 7.5 September 6.4 6.9 September 5.3 6.1
October 2.0 4.2 October 7.0 7.2 October 6.3 6.7 October 5.1 6.0
November 2.6 3.6 November 8.1 8.3 November 7.3 7.6 November 6.2 6.9
December 3.0 3.8 December 7.5 8.1 December 6.8 7.4 December 6.6 7.0
January 3.6 3.9 January 7.4 7.8 January 6.9 7.2 January 6.1 6.7
February 4.0 4.0 February 7.8 8.7 February 7.2 7.9 February 6.4 7.0
March 3.2 3.5 March 7.9 8.2 March 7.2 7.4 March 6.3 6.8
Annual Average 3.2 3.7 3.7 Annual Average 6.8 7.2 7.3 Annual Average 6.2 6.6 6.7 Annual Average 5.4 5.9 6.0
Average Apr-May 3.7 3.2 3.1 Average Apr-May 6.3 6.6 7.3 Average Apr-May 6.0 6.1 6.6 Average Apr-May 5.1 5.3 5.7
578 2846 3424 15623
Appendix 1
Absence Trends - 2023/2024, 2024/2025 & 2025/2026
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 31 May 2025 No of Employees at 31 May 2025 No of Employees at 31 May 2025 No of Employees at 31 May 2025
46

Page 47

Mar - May Mar - May
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 88 108
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 5
TOTAL 320 329
Mar - May Mar - May
2024 2025
Over 7 day absences 7 2
Minor 28 15
Near Miss *** 1 2
Violent Incident:  Physical**** 9 8
Violent Incident:  Verbal***** 4 7
Total Accidents/Incidents 49 34
Mar - May Mar - May
2024 2025
Total Number of Hearings 19 39
Time Taken to Convene Hearing - Mar to May 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
12 18 9
Mar - May Mar - May
2024 2025
Number of Grievances 1 3
Number Resolved at Stage 2 0 1
Still in Progress 1 2
Mar - May Mar - May
2024 2025
Number of Incidents 0 1
Still in Process 0 1
RECORD OF DIGNITY AT WORK
136 89
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
0 2
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
96 125
47

Page 48

Mar - May Mar - May
2024 2025
Career Advancement 3 6
Child Caring / Caring Responsibilities 1 1
Disatisfaction with terms and conditions 1 1
Further Education 0 1
Moving outwith area 0 3
Personal Reasons 1 7
Poor relationship with managers / colleagues 0 4
Other 38 7
Total Number of Leavers Eligible for Exit Interview 44 30
Number of Exit Interviews conducted 8 6
Percentage of interviews conducted 18% 20%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
48

Page 49

As at 8 March 2025
Total Number of Employees
F/T P/T F/T P/T
1198 365 239 1549
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1650.91 410.60 269.67 47.94 18.30 0.00 2.00 0.00 2404.42
As at 14 December 2024
Total Number of Employees
F/T P/T F/T P/T
1206 378 240 1563
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1669.72 416.48 269.41 47.94 18.30 0.00 2.00 0.00 2428.85
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3387
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3351
MALE FEMALE TOTAL
49

Page 50

50

Page 51

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resource Plan - Quarter 4
Progress Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Community and Enterprise Resource Plan Quarter 4 Progress
Report for 2024/2025
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Community and Enterprise Resource Plan Quarter 4 Progress Report
2024/2025, as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted;
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3. of this report, be noted;
(3) that the areas for improvement and associated management actions, as
detailed in paragraph 5.4. of this report, be noted; and
(4) that the additional scrutiny of changes in measure status between Quarter 2
and Quarter 4, as summarised in paragraph 5.5. and detailed at Appendix 3 of
this report, be noted. 
3. Background
3.1. The Community and Enterprise Resource Plan 2024/2025 was approved by the
Community and Enterprise Resources Committee on 18 June 2024 and noted by the
Executive Committee on 26 June 2024 and sets out the outcomes, measures and
actions to be managed and delivered by the Resource for the financial year
2024/2025. 
3.2. The Resource Plan follows the agreed corporate structure and style. The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027. 
4. Resource Outcomes 2024/2025
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2024/2025. These are detailed at Appendix 1. 
8
51

Page 52

5. Quarter 4 Progress Report 2024/2025
5.1. Progress against all Resource Plan measures is contained in the Quarter 4 Progress
Report 2024/2025, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:  
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. Measures which are classified as ‘red’ are considered in detail at section 5.4. of this
report. To ensure adequate scrutiny of performance across all Resources, the
Council’s Performance and Review Scrutiny Forum may consider ‘red’ and/or
‘amber’ measures at a future meeting. 
The overall summary of progress to date is set out in the table below: 
Status Measures
Statistical Project Total %
Blue 0 9 9 16.1
Green  15 21 36 64.2
Amber  2 3 5 8.9
Red     3 0 3 5.4
Report later/Contextual 1 2 3 5.4
Totals  21 35 56 100%   
(Data correct as at 17 June 2025)  
5.3. Key achievements for 2024/2025, to date, are noted below: 
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
Communities are
encouraged and
supported to
reduce, re-use and
recycle their waste
The percentage of household waste sent to landfill in the
period January to December 2024 was 1.32%, well within
the target of below 5% target. 
The review of the Waste Service has been completed. 
Communities are
well connected
The percentage of properties with Full Fibre Connection
has increased to 58.87%, a significant increase of 13.44%
over 2024/2025, exceeding the annual target to reach 43%
coverage. 
52

Page 53

Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
All roads, footways,
cycle routes,
bridges and
associated
infrastructure are
safe and fit for
purpose
Across our capital programme, 126 road safety schemes
have been delivered (105 carriageway/21 footway). 
A programme of bridge and other structure projects have
been implemented, including the £9.4m replacement of the
Clyde Bridge.
Annual Accident Investigation and Prevention analysis
identified seven locations for road safety improvements.
Funding from the Road Safety Improvement Fund has
allowed works to be completed on these identified routes/
sites. 
Road and
transportation
infrastructure
supports new
development,
enables use of
public transport and
encourages active
travel
The Outline Business Case for the Stewartfield Way
project was approved at the Council’s Executive
Committee on 13 November 2024. 
Connect Outcome  Health and Wellbeing
Resource
Outcome
Achievement
All residents have
the opportunity to
access cultural,
leisure and outdoor
recreational
activities to help
improve their
wellbeing and
quality of life
The £13m Transition Fund is helping to modernise the
leisure and culture asset base. Phase 1 of the Transition
Fund (£8.5m) spend underway. Phase 2 projects were
approved at Executive Committee on 13 November 2024
and are now being progressed. 
Larkhall Leisure Centre - contractor has been appointed
and extensive community consultation took place in the
autumn 2024. An additional £3.85m of Council funding has
been secured to enable the inclusion of a games hall. 
Clydesdale Way paths project / joint ‘Three Rivers’ venture
with Dumfries and Galloway and Scottish Borders
Councils. A Grant funding agreement has now been
concluded with Dumfries and Galloway, and consultants
Turner and Townsend appointed to design, and project
manage the project. 
Country Parks masterplan exercise is concluding, and the
consultants are leading a multi-disciplinary team to develop
business cases for both Chatelherault and Calderglen
Country Parks. 
53

Page 54

Connect Outcome  Health and Wellbeing
Resource
Outcome
Achievement
Works on the six play areas identified for investment in
Rutherglen and Cambuslang, as part of the multi-year Play
Area Investment Programme, are now complete. 
Consultation on play areas has been undertaken with local
members and communities in the Hamilton area. 
Connect Outcome  Our Economy
Resource
Outcome
Achievement
South Lanarkshire is
an attractive place
to start, grow and
locate a business
Support for businesses in South Lanarkshire has exceeded
the set targets against the following measures:
- the number of business support interventions per
annum by Economic Development was 1,014 (target
800)
- the number of jobs created or sustained as a direct
result Economic Development intervention was
1,071 (target 500)
- increased value of sales generated by businesses
as a direct result of Economic Development
intervention was £8.532m (target £5m)
A range of programmes, services and events to business
have been delivered including:
- Food and Drink: the Council financially and
practically supported the Lanarkshire Larder.
- Tourism: the Council has delivered a range of
projects to support tourism in the area, such as a
travel trade programme to help businesses that
operate primarily in the tourism sector to become
ready to work with the travel trade.
- Construction: Build Lanarkshire Programme was
successfully delivered by the Council in conjunction
with North Lanarkshire and Hub South West.
- Young Enterprise: the Council successfully
delivered the inaugural Shark Reef initiative aimed
at promoting entrepreneurship to S3 pupils.
- Meet the Real Buyer event: Co-delivered,
successfully enabling local businesses to speak to
public and private sector buyers. 
Economic
development and
growth in South
Lanarkshire is fair,
inclusive,
sustainable and low
carbon
Levelling Up Fund – delivery of grant funded projects:
 Clydesdale Way: see update above in relation to
Connect Outcome – Health and Wellbeing
 Shawfield: Clyde Gateway have commenced delivery of
the project, with the original programme on schedule. 
54

Page 55

Connect Outcome  Our Economy
Resource
Outcome
Achievement
A people-centred
approach to
recovery is
implemented to help
individuals,
communities,
businesses and the
social and third
sector thrive
3,059 participants have been supported on Council-
operated employability programmes; over double the 1,500
target. 
804 participants have accessed further education formal
training programmes following employability support. 
Thriving town and
neighbourhood
centres provide a
focal point for local
communities
The East Kilbride masterplan is progressing at pace with
project team appointed and a project board established to
oversee the delivery of various workstreams.   
Funding is in place to move forward with the Hamilton
Town Centre masterplan. 
5.3.1. In addition to working towards these Outcomes, it is recognised that the Council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Objective
Achievement 
Customers
experience high
quality and
improving Council
services 
Year two of the three-year (2024/2025) Frontline First Fund
(totalling £3.5m) is fully implemented. Includes
improvements to roads drainage through a gully cleaning
and drainage repairs programme, refurbishment of Carluke
marketplace, remodelling and relandscaping of Blantyre
miner’s monument, ongoing repair of Lanark Loch
walkways, and shrub bed removal at Westwoodhill, East
Kilbride. 
5.4. Areas for improvement
Measures that have been classified as ‘red’ (major slippage against timescale or
shortfall against target) are noted below, together with the reason why, and the
management action now being taken, where applicable. 
Communities and Environment
Resource Outcome:   Communities are encouraged and supported to reduce, re-
use and recycle their waste
Measure  Comments/Progress Action by Manager 
(where applicable)
Percentage of
total
household
waste that is
recycled
The year-to-date figure reflects
performance from January to
December 2024 and is
calculated at 41.8% This
remains below the target of 50%
To help move closer to the
50% target, Waste Services
are doing the following: 
55

Page 56

Communities and Environment
Resource Outcome:   Communities are encouraged and supported to reduce, re-
use and recycle their waste 
•  Extending recycling services
at flatted properties to
include those that have
typically low participation
rates. 
•  The Waste Education Team
continue to work with
residents across South
Lanarkshire to improve
recycling knowledge and
participation. 
•  The Council is committed to
aligning with forthcoming
Scottish Government
requirements and
embedding best practice to
increase recycling rates  
Communities and Environment
Resource Outcome:   All roads, footways and bridges and associated
infrastructure are safe and fit for purpose
Measure  Comments/Progress Action by Manager          
(where applicable)
Percentage of
our road
network that
should be
considered for
maintenance
treatment
(Roads
Condition
Index)
The actual figure for 2023/25 of
32.5% indicates a regression of
0.6% of the amount of our road
network in an amber or red
status. Deterioration is also
showing across individual road
categories to a similar extent.
It is hoped that following the
budget announcement in
February 2025 to increase
capital funding, we will be able
to stabilise the condition of the
network in the coming years. 
Our Economy
Resource Outcome:   South Lanarkshire is an attractive place to start, grow and
locate a business
Measure  Comments/Progress Action by Manager 
(where applicable)
Number of
new South
Lanarkshire
business starts
supported by
Business
Gateway
This year represents a
transition for the Business
Gateway, changing from a
contract based external
provider model, to an in-house
model which will reflect a more
customer focused, rather than
target driven, delivery model.
The transition led to a
significant disruption to the
Through the revised customer
focused service approach
appropriate target levels will
be established going forward.
56

Page 57

Our Economy
Resource Outcome:   South Lanarkshire is an attractive place to start, grow and
locate a business
service. 
5.5. Scrutiny of change in measure status 
A further analysis introduced to aid scrutiny of performance, is to highlight and
explain all measures that have changed status from Quarter 2 to Quarter 4. On
analysis of these, four measures show a decline in performance between Quarter 2
and Quarter 4. Details of these four measures are included at Appendix 3. The
remaining measures under scrutiny changed from Green/Report later to Blue
(complete) and need no further action. 
5.5.1. It should be noted that the measures with a ‘report later’ status, as detailed in
Appendix 3, will be followed up and reported on in the 2025/2026 Quarter 2 progress
report. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
6.2. Absence statistics are monitored and reported through the Council-wide workforce
monitoring report which is presented to each Resource Committee and the
Employees Issues Forum. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the Council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report,
however a number of actions within the Resource and Service Plans contribute
positively to the Council’s Sustainable Development and Climate Change Strategy. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024/2025. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register.
57

Page 58

10. Integrated Impact Assessment and Consultation Requirements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and integrated impact
assessment. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022 to 2027 
Previous References
 Community and Enterprise Resources Quarter 2 Progress Report 2024/2025: 26
November 2024
 Community and Enterprise Resource Plan 2024/2025 – approved by Community and
Enterprise Resources Committee on 18 June 2024 
List of Background Papers
 Council Plan Connect 2022 to 2027 – approved by the full Council on 15 June 2022 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Anne Lewis (Performance and Development Officer)
E-mail:  anne.lewis@southlanarkshire.gov.uk
58

Page 59

Appendix 1
Community and Enterprise Resource Outcomes 2024/2025 
Connect
Outcomes Resource Outcomes  
Communities and
Environment 
• High-quality streets, parks and other public areas ensures South
Lanarkshire is a place where people want to live, work, visit and invest
• Communities are encouraged and supported to reduce, re-use and
recycle their waste
• The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate
change, and acting sustainably
• Communities are well connected 
• All roads, footways, cycle routes, bridges and associated infrastructure
are safe and fit for purpose
• Road and transportation infrastructure supports new development,
enables use of public transport and encourages active travel
• The 20-minute neighbourhood principle is established in our
communities to make our places more sustainable and liveable.
Education and
Learning 
• No resource outcomes for this Connect outcome 
Health and
Wellbeing 
• Public health is safeguarded through an effective environmental
regulation and enforcement service
• All school and nursery children have access to nutritious school meals 
• Health inequalities are addressed through collaboration with local
communities and partners
• All residents have the opportunity to access cultural, leisure and
outdoor recreational activities to help improve their wellbeing and
quality of life
Children and
Young People 
• No resource outcomes for this Connect outcome 
Housing and
Land 
• Vacant, derelict and contaminated land is brought back into productive
use
• Appropriate supply of housing land (including affordable housing) is
maintained
Our Economy  • South Lanarkshire is an attractive place to start, grow and locate a
business
• Economic development and growth in South Lanarkshire is fair,
inclusive, sustainable and low carbon
• Thriving town and neighbourhood centres provide a focal point for local
communities 
• Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth  
• Consumers and communities are protected through an effective trading
standards service 
• A people-centred approach to recovery is implemented to help
individuals, communities, businesses and the social and third sector
thrive
Delivering the
Plan and
achieving Best
Value
• The council demonstrates high standards of governance and sound
financial stewardship
• Customers experience high standards of governance and sound
financial stewardship
• The workforce has the skills, flexibility and capacity to deliver the
council’s outcomes
• Digital and ICT services meet the needs of the council and its
customers 
59

Page 60

60

Page 61

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 13 Jun 16:43
Quarter 4 : April 2024 - March 2025
South Lanarkshire Council
Community and Enterprise
Resource Plan
(This represents the cumulative position to March 2025)
Performance Report 2024-25
8
61

Page 62

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 13 Jun 16:43
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 6 1 2 0 9
Education and Learning 0 0 0 0 0
Health and Wellbeing 2 1 0 0 3
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 7 0 1 1 9
Delivering the plan and achieving best value 0 0 0 0 0
Total 15 2 3 1 21
Page 1
62

Page 63

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of streets found to be
acceptable during Litter Monitoring
Systems Surveys
The final results from the Litter Monitoring System Survey show that
92.9% of streets have been assessed as acceptable, exceeding the
92% target.
Green 92.00% 92.90% 92.10% 92.30% 92.00%
Land Audit Management System grounds
maintenance score
The Land Audit Management System (LAMS) final overall score at
quarter four was 72, equalling the annual target.
Green 72.0 72.0 71.3 72.0 72.0
Page 2
63

Page 64

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of total household waste that is
recycled in 2024
This measure is reported per calendar year and reflects the
performance from January to December 2024. The annual household
waste recycling figure is below target.
The inability to now recycle Waste Upholstered Domestic Seating
(WUDS) means that this type of waste must be incinerated. This is
having an impact on the amount of bulky waste that is recycled.  The full
extent of the impact is not yet known, but information will be provided
when available.
To help move closer to the 50% target, Waste Services are doing the
following:
•  Extending recycling services at flatted properties to include those that
have typically had low participation rates. Supported by the £0.28 million
of Scottish Government Recycling Improvement Fund investment over
two years, the Council has procured new bespoke communal recycling
bins. The bin roll out is now complete, however, the full impact on
recycling rates and resident behaviour will not be available until the end
of 2025. Progress will be monitored going forward.
•  The Waste Education Team continue to work with residents across
South Lanarkshire to improve recycling knowledge and participation. By
offering guidance and engaging directly with communities they aim to
support long-term improvements in sustainable waste management.
•  Actively monitoring changes in national legislation and guidance, as
outlined in the Waste Policy Update Report presented to the Climate
Change and Sustainability Committee in March 2025. The Council is
committed to aligning with forthcoming Scottish Government
requirements and embedding best practice to increase recycling rates.
Red 50.00% 41.80% 41.50% 41.20% 43.75%
Page 3
64

Page 65

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of household waste sent to
landfill in 2024
This measure is reported per calendar year and the latest figures
(1.32%) relate to the period from January to December 2024.
Performance for the year is well within target.
Green 5.00% 1.32% 8.66% 1.84% 1.50%
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change, and acting
sustainably
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduction in the Council carbon emissions
in 2023/24 compared to 2022/23 (previous
year)
The carbon emissions are reported a year behind, so we are currently
reporting on 2023/24 figures and note that the Council’s carbon
emissions reduced by 9.46% in comparison with 2022/23.
The 2023/24 decrease in emissions is due to a reduction in gas
consumption for the Council Estate and a reduction in the Council's
Fleet size in 2023/24 compared with 2022/23.
The figures for 2024/25 are not currently available however they will be
included in the year end carbon management report to the Climate
Change and Sustainability (CCS) Committee in November 2025.
The target is to continue to reduce the Council's carbon emissions.
Green ------ ------ ------ ------ 9.46%
Page 4
65

Page 66

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are well connected
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of properties with Superfast
Broadband >30Mbps
Coverage of superfast broadband has increased by 0.91% over the year
to 98.8%.
Increases are marginal and based on small numbers of rural properties
and continued roll out of R100 programme funded by the Scottish
Government.
Green 99.0% 98.8% 97.0% 97.3% 97.9%
Percentage of properties with Full Fibre
Connection
There has been an increase in the year of 13.44% in high speed full
fibre provision to properties.  This brings the year to date figure to
58.87% exceeding the annual target of 43%.
The coverage is also comparable with North Lanarkshire Council (NLC)
at 58.14% which has a lower rural area to cover than South Lanarkshire.
Green 43.00% 58.87% 21.89% 32.60% 45.43%
Page 5
66

Page 67

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways and bridges and associated infrastructure are safe and fit for purpose
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of our road network that should
be considered for maintenance treatment
(Roads Condition Index).
This figure is derived from the Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year.
The target of 31.9% for 2023/25 is based on the results for the period
2022/24.
The actual figure for 2023/25 of 32.5% indicates a regression of 0.6% of
the amount of our road network in an amber or red status.
Deterioration is also showing across individual road categories to a
similar extent.
It is hoped that following the budget announcement in February 2025 to
increase capital funding we will be able to stabilise the condition of the
network in the coming years.
Red 31.9% 32.5% 29.7% 30.8% 31.9%
Number of road casualties in South
Lanarkshire during 2024.
Provisional casualty figures are available for the full duration of 2024,
when there were 382 casualties. Of these, there were nine fatal
casualties, 134 serious casualties and 239 slight casualties. There were
no child fatal casualties, eight children seriously injured and 37 children
slightly injured.
These figures can be compared to the calendar year 2023, when there
were 370 casualties. Of these, there were seven fatalities, 124 serious
casualties and 239 slight casualties. For children in 2023, there was no
child fatal casualties, 22 children seriously injured and 21 children
slightly injured.
Amber 370 382 254 284 370
Page 6
67

Page 68

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
Public health is safeguarded through an effective environmental regulation and enforcement service
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Broad compliance with food law statutory
requirements secured in premises
During 2024/25, 95% (2,739) of food businesses that have been
inspected were found to be broadly compliant with both food hygiene
and food standards legislation. This compliance figure continues to
exceed the annual target set for this measure.
Since the new food law rating scheme came into affect, local authorities
can focus resources on high risk and non-compliant businesses by
conducting more frequent inspections in these establishments.
Green 85.0% 95.0% 93.0% 96.0% 95.0%
All schools and nursery children have access to nutritious school meals
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Level of primary school meal uptake (as a
proportion of total primary school meals
which could be taken up over the period)
Primary school meal uptake for the year was 65%.  There has been
a slight decrease in take up of paid meals compared to the previous
year.
Amber 66.0% 65.0% 58.2% 66.0% 69.2%
Level of secondary school meal uptake (as
a proportion of total primary school meals
which could be taken up over the period)
Secondary school meal uptake for the year was 40% and therefore
exceeded the target set.
Green 38.0% 40.0% 36.3% 38.0% 39.9%
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of new South Lanarkshire
business starts supported by Business
Gateway
This year represents a transition for the Business Gateway,
changing from a contract based external provider model, to an in
house model which will reflect a more customer focused, rather
than target driven, delivery model. The transition led to a
significant disruption to the service.
Through the revised customer focused service approach,
appropriate target levels will be established going forward.
Red 500 240 ------ 520 499
Page 7
68

Page 69

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
The majority of business support interventions were made up of
registration and event attendance via the Supplier Development
Programme (SDP). The number of interventions in 2024/25 was 1,014,
exceeding the target of 800.
Green 800 1,014 2,679 1,615 829
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
The number of created or sustained jobs reported here is taken primarily
from business grant and expert help approvals. The target (500) has
been exceeded with 1,071 jobs created or sustained per annum.
Green 500 1,071 1,095 1,256 646
Page 8
69

Page 70

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Increased value of sales generated by
businesses as a direct result of Economic
Development intervention
This figure is taken from business grant applications and demonstrates
the significant impact our grant scheme has on supporting local
businesses.
Green £5.000m £8.532m £22.107m £13.113m £14.496m
Percentage of procurement spend on local
enterprises
This is a local government benchmarking framework indicator. 2023/24
information was published in January 2025, and showed that the
percentage of spend on local enterprises increased from 18.1% in
2022/23 to 19.5% in 2023/24, an increase of 1.4%.
While this remains well below the Scottish average of 30.7% and places
South Lanarkshire in 27th place out of the 32 local authorities in
Scotland, it should be noted that this is a national figure which is skewed
by rural and island local authority figures, where access to reliance on
local suppliers is more common.
Construction is an area of high spend in South Lanarkshire where
opportunities to improve local spend has been sought. The impact of
high inflation in the construction sector and the challenges across the
public sector on delivering large scale construction projects has reduced
some opportunity at a local level.
The perceived complexity of public sector procurement and the required
investment in completing tender submissions is deterring some small
businesses that might lack sufficient administrative resources.  There is
a greater proportion of smaller enterprises in South Lanarkshire which
increases the challenge in increasing and improving this measure.
Supplier engagement and promotion of the free to access support,
continues to encourage participation in tendering exercises.
The figure for 2024/25 will be reported as part of the LGBF framework in
early 2026.
Report Later ------ ------ 18.2 18.1 19.5
Page 9
70

Page 71

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Delivery of UK Shared Prosperity
Programme
The UKSPF reached full spend of £7.8m in 2024/25. This brings the
three year spend in at £12.1m at its conclusion in March 2025.
The programme has delivered across Place, Business Employability and
multiple themes on 24 interventions including, supporting employability
projects, maths learning projects, and business grants.
Funding of £4m has now been awarded for an additional one year
period.
Green £6.000m £7.800m ------ ------ £3.489m
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants supported via
council-operated employability
programmes
3,059 participants have been supported via employability
programmes from April 2024 to March 2025, exceeding the 1,500
target.
The 2024/25 target was set prior to the restructure of the
Employability Service.  The Service was going through the process
of establishing new and additional programmes and these
programmes were set up to receive referrals more quickly than
anticipated. This, coupled with a high level of demand, has led to
significant over achievement against this target.
Green 1,500 3,059 1,934 1,687 2,663
Page 10
71

Page 72

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants gaining sustainable
employment
725 participants have progressed into employment since April 2024
following support by the Employability Team, this exceeds the target of
700.
Green 700 725 1,146 584 643
Number of participants accessing further
education or training
804 participants have accessed further education or training via the
Employability Team since April 2024 to March 2025, exceeding the
target of 400.
The 2024/25 target was set prior to the restructure of the
Employability Service.  The Service was going through the process
of establishing new and additional programmes and these
programmes were set up to receive referrals more quickly than
anticipated. This, coupled with a high level of demand, has led to
significant over achievement against this target.
Green 400 804 219 536 870
Page 11
72

Page 73

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 4 9 2 0 0 15
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 2 2 0 0 1 5
Children and Young People 0 0 0 0 0 0
Housing and Land 0 0 1 0 0 1
Our Economy 3 9 0 0 1 13
Delivering the plan and achieving best value 0 1 0 0 0 1
Total 9 21 3 0 2 35
Page 12
73

Page 74

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Action Measures Comments/ Progress Status
Prepare an Open Space
Strategy in partnership
with Glasgow and Clyde
Valley Green Network
Partnership and other
council services
Engagement on the findings following analysis of the Open
Space audit will be carried out during quarter two and will in
turn be used to inform the evidence report for the Local
Development Plan 3. It is anticipated that a draft Open
Space Strategy will be available early 2025 once the
Gatecheck of the Evidence Report has been completed.
Engagement started in the second half of 2024/25 and the outcomes
will be further analysed.  It is anticipated that a draft Open Space
Strategy will be reported to the Planning Committee in September
2025.
Amber
To make South
Lanarkshire a cleaner
place to live, work and
visit free of litter, fly
tipping and dog waste
Prepare an annual progress report for Climate Change and
Sustainability Committee in September 2024, demonstrating
the impact of the Litter Strategy (2022-2027)
The Litter Strategy annual progress report and presentation to Climate
Change and Sustainability Committee was completed in December
2024.
Complete
Communities are encouraged and supported to reduce, re-use and recycle their waste
Action Measures Comments/ Progress Status
Support a circular
economy by re-using,
recycling and generating
energy from the waste
we manage
Complete the review of waste services taking into
consideration that the Deposit Return Scheme (DRS) has
been postponed until October 2027 and the outcome of the
Circular Economy Bill consultation
The review of the Waste Service has been completed in line with
timescales and a report detailing the work of the review was
presented at Community and Enterprise Resources Committee on
25 February 2025 for noting, along with a report updating elected
members on upcoming legislative and policy changes within the
waste sector, which will impact Council budgets in the future.
The Council's depot rationalisation project is considering current
waste infrastructure requirements as part of a larger review.
In terms of changes to collection services, this will be dictated by
the new household waste and recycling charter, due at the end of
March 2026.
Complete
Page 13
74

Page 75

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,and acting sustainably
Action Measures Comments/ Progress Status
Lead by example and
influence area-wide
climate change and
sustainability action
Implement the Sustainable Development and Climate
change Strategy (2022-2027) Action Plan, and report
progress at quarter two and quarter four to Climate Change
and Sustainability Committee
Implementation of the Sustainable Development and Climate Change
Strategy (SDCCS) and Action Plan has progressed on time and has
delivered a number of positive outcomes and actions. The SDCCS
Action Plan quarter four update for 2024/25 was presented to the
Climate Change and Sustainability (CCS) Committee in June 2025,
highlighting the progress and impact over the last year. The Action
Plan for 2025/26 was approved by CCS Committee in March 2025.
Green
Ensure national
planning policy set out in
National Planning
Framework 4 in relation
to climate change,
biodiversity and
sustainable travel is
embedded in decision
making process for
planning applications
and the preparation of
the South Lanarkshire
Local Development Plan
3
Awareness sessions to be developed for elected members,
planning officers and developers/agents by September 2024
Officer workshops and members’ awareness sessions were held in
Spring 2024. However, awareness sessions with developers and
agents have not taken place. The Scottish Government recently
published draft guidance on implementing the Climate Change policy
position in the National Planning Framework 4 (NPF4) and it is
therefore appropriate to postpone further awareness raising until the
national policy direction is clearer.
In the meantime, non-statutory planning guidance on the Nature topic
is being developed by the Planning Service and it is intended to report
this to the Planning Committee 2025/26 after which it will be published
on the Council’s website and used in the decision making process for
planning applications.
Green
Page 14
75

Page 76

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,and acting sustainably
Action Measures Comments/ Progress Status
Create the conditions for
the decarbonisation of
the council's fleet
Implement and review the Fleet Strategy (2020-2025) Action
Plan including reducing transport related emissions, through
converting the fossil fuelled small fleet to full electric and
trialling new fuel options for the medium to heavy fleet as
such opportunities become commercially viable
An update to the Fleet Strategy is now underway. It is recognised that
the two years lost to the Covid-19 pandemic impacted the extent of
progress that might have otherwise been made.
A recent recruitment exercise has now provided some stability to focus
on this key piece of work.  A paper will be presented to a future
Committee most likely towards the end of 2025.
Green
Deliver new and
improved low carbon
vehicle charging
infrastructure
Maintain, manage and expand public infrastructure points /
hubs in line with available internal and external funding
sources
Work is continuing on the regional collaboration initiative to expand
and enhance vehicle charging infrastructure across the west. An Inter
Authority Agreement has been agreed.  A consultant has been
appointed to project manage the next phase and to prepare tender
documentation.  This will seek to appoint a commercial operator for
publicly available electric vehicle charging infrastructure.
Green
Page 15
76

Page 77

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Deliver prioritised road
safey infrastructure
improvements and
promote road safety
Deliver a programme of carriageway and footway projects in
line with agreed 2024-25 funding
Annual AIP (Accident Investigation and Prevention) analysis identified
seven locations for road safety improvements. Funding from the RSIF
(Road Safety Improvement Fund) has allowed works to be progressed
on these identified routes/ sites:
•A70 from A73 Hyndford Road to A743 Ravenstruther
•A726 from Torrance Roundabout to Strathaven
•A706 from Forth to Council Boundary
•Hillhouse Road/ Technology Avenue, Hamilton
•A71 Ayr Road nr Burnhead Road, Shawsburn
•B743 Strathaven to Muirkirk
•Burnbank Road, Hamilton
Green
Page 16
77

Page 78

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Prepare prioritised
programme of
carriageway and
footway maintenance
works
Deliver a programme of carriageway and footway projects in
line with agreed 2024-25 funding
Across the capital programme, delivery of 92 schemes were
identified for 2024/25 (71 carriageway/21 footway); at year end,
126 schemes were actually delivered (105 carriageway/21
footway).
Green
Page 17
78

Page 79

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Prepare prioritised
programme of bridge
and structure
maintenance works
Deliver a programme of bridge and other structures projects
in line with agreed 2024-25 funding
Replacement of the C29 Clyde Bridge – construction phase completed
in quarter one.
Emergency repair and strengthening of Burnhouse Bridge by
Auldhouse :– construction phase completed in quarter three.
East Kilbride line electrification – Maintenance and refurbishment of
four SLC structures affected:- works complete in quarter four.
Structural appraisal of Duke Street Multi Storey Car Park :– appraisal
was to be completed over three separate phases. Phase one
commission for Initial Appraisal and Condition Survey complete.
Phase two deferred and interim safety measures to address defects
identified in Phase one is now complete.
Refurbishment and repair of Priestburn Bridge by Glassford :-
construction phase completed in quarter three.
Refurbishment and installation of high containment kerbing at A702
Elvanfoot Bridge :– Contract awarded in quarter three.  Construction
period commenced in quarter four and works completed in April of
2025/26 quarter one.
Green
Prepare prioritised
programme of traffic
signal and pedestrian/
cycle crossing
maintenance works
Deliver a programme of traffic signal and pedestrian / cycle
crossing upgrade projects in line with agreed 2024-25
funding
Two pedestrian crossing facilities have been installed on Burnbank
Road, Hamilton.
Four pedestrian crossings have been upgraded, funded from the
Direct Resource fund. These are located at the following sites:
•High Common Road, East Kilbride
•Cadzow Street at Lower Auchingramont Road, Hamilton
•Portland Place, Hamilton
•Main Street, High Blantyre
Green
Page 18
79

Page 80

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Works to upgrade the pedestrian crossing on Stonelaw Road in the
vicinity of the Tesco store were completed during March 2025.
A crossing on Main Street, Rutherglen, on the National Cycle Network
756, has been upgraded to a Toucan utilising funding received from
Sustrans.
Deliver winter
maintenance
carriageway and
footway gritting actions
during inclement
weather
During adverse weather, undertake appropriate
precautionary actions and during severe weather ensure
main, secondary and extreme routes are treated as
necessary.
Gritting action has been undertaken throughout the Winter
season.
Green
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Produce a new Local
Transport Strategy for
South Lanarkshire
Draft Local Transport Strategy will be presented to
Committee in Autumn 2024
An initial draft structure for the Local Transport Strategy (LTS) was
submitted to the Community and Enterprise Resource Committee
in April 2024. To allow for the strategy to take cognisance of the
latest Transport Scotland guidance issued in June 2024,
consultation on the draft Local Transport Strategy will now be
undertaken in late August - September 2025, with the draft LTS to
be presented to Committee for approval later in 2025.
Amber
Page 19
Complete
80

Page 81

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Deliver road and
transportation
infrastructure
improvements to
support new
developments, including
those undertaken as
part of the City Deal
Stewartfield Way and East Kilbride Town Centre Project
business case will be prepared in 2024
The Outline Business Case for the Stewartfield Way project was
approved at the Council's Executive Committee on 13 November
2024.
Complete
Encourage active travel
by extending our
network of walking and
cycling routes
Deliver walking and cycling projects/ schemes in line with
agreed 2024-25 capital programme
Active Travel One Funding has been awarded by Transport
Scotland and active travel project works are progressing as follows:
• New facilities for pedestrians and cyclists as part of the Hairmyres
Station project
• Shared pedestrian / cycle crossings at Eaglesham Road/Redwood
Drive/Greenhills Road
Green
Health and Wellbeing
All school and nursery children have access to nutritious school meals
Action Measures Comments/ Progress Status
Complete the roll out of
free school meals to all
primary children
All P6s and P7s to receive free school meals in line with
Scottish Government timescales
Awaiting confirmation from the Scottish Government of when the
expansion of free school meals for all primary six and seven pupils will
be rolled out. However, the Scottish Government has introduced free
school meals to those pupils in primary six and seven who are in
receipt of Scottish Children's Payment.
Report Later
Page 20
81

Page 82

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All residents have the opportunity to access cultural, leisure and outdoor recreational activities to help improve their wellbeing and quality of life
Action Measures Comments/ Progress Status
Work in partnership with
South Lanarkshire
Leisure and Culture
(SLLC) to maintain and
deliver community
facilities
Continue to review leisure and culture community facilities,
maintaining and improving them through the Capital
Programme and Transformational Fund
The Council appointed a consultant to undertake an independent
objective review of Council properties, including those operated by
SLLC. At the same time, the £13m Transition Fund is helping to
modernise the leisure and culture asset base. Phase 1 of the
Transition Fund (£8.5m) spend is taking place this financial year with
properties already identified. Phase 2 projects were approved at
Executive Committee on 13 November 2024.
Larkhall Leisure Centre - contractor has been appointed and extensive
community consultation took place in the autumn 2024 with
Community Engagement drop-in sessions taking place. Feedback was
extremely positive for the pool, gym and fitness / community room
design but there was expression of concern regarding the omission of
a games hall. An additional £3.85m of Council funding has since been
secured to enable the inclusion of a games hall.
Clydesdale Way paths project / joint ‘Three Rivers’ venture with
Dumfries and Galloway and Scottish Borders Councils, award of
£22,809,416 received from the Levelling Up Fund (LUF) and tender
exercise complete. UK Government have awarded funding following
the budget in October 2024. A Grant funding agreement has now been
concluded with Dumfries and Galloway, and consultants Turner and
Townsend appointed to design, and project manage the project.
Country Parks masterplan exercise is underway, and the consultants
are leading a multi-disciplinary team to develop business cases and
supporting intelligence that will identify investment priorities, and
support future funding applications and investment in both
Chatelherault and Calderglen Country Parks.
Green
Page 21
82

Page 83

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All residents have the opportunity to access cultural, leisure and outdoor recreational activities to help improve their wellbeing and quality of life
Action Measures Comments/ Progress Status
Begin implementation of
the multi-year Play Area
Undertake consultation with local members and communities
in Hamilton area by March 2025
Consultation took place with seven elected members from the Blantyre
and Hamilton wards on 25 March 2025.
Complete
Investment Programme Consultation exercise to be completed with schoolchildren
for Rutherglen and Cambuslang before proceeding to design
stage and then putting these works out to tender. Works to
be completed in 2024
Works on the six play areas identified for investment in Rutherglen
and Cambuslang, as part of the multi-year Play Area Investment
Programme, are now complete.
Complete
Improve health and
wellbeing by offering
attractive and affordable
leisure and cultural
activities delivered with
warmth, friendliness and
individual pride
Implement the South Lanarkshire Leisure and Culture
Strategy (2022-2027), monitor impact on a quarterly basis via
the four SLLC Strategy Implementation Groups, and report
on progress twice per year to the Community and Enterprise
Resources Committee
South Lanarkshire Leisure and Culture (SLLC) are continuing to
deliver the main aim of the five-year strategy.  The respective groups
continue to meet to ensure they deliver on the strategic priorities within
each of the service areas.  All achievements and progress are
documented within the quarterly performance reporting arrangements
to the Corporate Management Team (CMT) within SLC and also
reporting to the SLLC Board.  SLLC continue to review the
deliverables whilst reviewing their strengths, weaknesses,
opportunities as well as external influences that may challenge their
direction of travel.
Green
Page 22
83

Page 84

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Housing and Land
Vacant, derelict and contaminated land is brought back into productive use
Action Measures Comments/ Progress Status
Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the Vacant and Derelict
Land Fund framework agreed for 2024-25
2024/25 Vacant Derelict Land Fund (VDLF) Delivery Plan was
approved at the November 2024 meeting of Community and
Enterprise Resource Committee.
Cuningar Allotments project - the main works are complete, with
snagging works underway.
There has been no spend implemented at Langlands West site due
to data centre developer interest.
Design team fees incurred in relation to Cathcart Road industrial
development, but construction tender delayed until Summer 2025.
Amber
Page 23
84

Page 85

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate,
whilst creating the right
conditions for low
carbon economic growth
Deliver programmes, services, and events to businesses
around sectors, location, and themes (e.g., food and drink,
tourism, construction, low carbon, innovation,
internationalisation, collaboration, and young enterprise)
Food and Drink: The Council financially and practically supported the
Lanarkshire Larder, which is the industry led food and drink network for
Lanarkshire. The service also supported the Larder with fully funded
marketing consultancy support.
Tourism: The Council have delivered a range of projects and initiatives
to support the tourism sector in the area. The Council has delivered a
travel trade programme to help businesses that operate primarily in the
tourism sector to become ready to work with the travel trade, this
included a range of workshops, and funding support to assist
businesses in attending VisitScotland Connect, the national tourism
agencies flagship travel trade event.
Various marketing campaigns have also been running throughout the
year to support businesses by marketing them to a wider audience
through the VisitLanarkshire brand, and to drive visitor numbers.
Marketing was displayed via various channels such as digital, print and
radio to name a few.
Much of the focus for tourism support was also on sustainability and
the Council commissioned Green Tourism to create a suite of
resources particularly for tourism businesses in Lanarkshire to assist
them on their sustainability journey. Businesses have since created
their own sustainability policies and written their own green stories to
assist their PR efforts.
In response to VisitScotland announcing the retiral of their Quality
Assurance scheme due to adopting a digital first approach, the Council
has appointed digital tourism consultants, CTConsults, who have
delivered a digital transformation workshop for tourism businesses and
carried out a mapping exercise for the entire region to allow us to have
a baseline of the overall digital presence and digital bookability of
tourism businesses in the area. The Council are now working on a
Green
Page 24
85

Page 86

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
programme of 1:1 support for businesses to support their digital first
approach and introduce new, or develop current, booking systems.
Construction: The Council successfully delivered the Build Lanarkshire
programme in conjunction with North Lanarkshire Council (NLC) and
Hub South West (HSW).
Low Carbon: Business grants were available for projects which are
exclusively aimed at supporting a businesses journey to net zero.  This
was for projects based around capital expenditure, infrastructure
improvements, the need to bring in an external consultant and training
support.  The Council also mandated all those who received grant
funding to work with an external consultant to undertake a carbon
baseline assessment.
The Council have also offered fully funded consultancy support of up
to five days on energy efficiencies and net zero.  This was to support
businesses to reduce their greenhouse gas emissions. Examples of
topics that were offered include:
•Energy audits and action plans, including recommendations on
control and efficiencies;
•Low energy/sustainable production processes㟠
•Waste management㟠
•Reviews and planning㟠 and
•Net Zero Carbon Targets
Young Enterprise: The Council successfully delivered the inaugural
Shark Reef initiative which was aimed at promoting entrepreneurship
to S3 pupils.
The Council also successfully co-delivered the Meet the Real Buyer
event. This is where local businesses can speak to public and private
sector buyers to see if there are opportunities to do business with
Page 25
86

Page 87

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
them.
Support and host the Supplier Development Programme to
deliver events, training and e-commerce support to SME’s or
third sector organisations who are interested in working with
the public sector
The Council continues to host and provide support to the Supplier
Development Programme (SDP) who continue to provide a range of
training and events to SME's/third sector organisations.
Green
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Promote sustainable
economic development
across South
Lanarkshire
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of the South Lanarkshire Economic Strategy (2022-2027)
Annual report was presented to Community and Enterprise Resource
Committee in April 2024.
Complete
Deliver the Levelling Up
Funded projects
Delivery of the Levelling Up Fund grant funded projects
through the Clydesdale Way and Shawfield Remediation with
a value of £6.7m in 2024-25
Clydesdale Way: The Grant Award Agreement with Dumfries and
Galloway Council, the lead authority for this joint project, has been
finalised. Turner and Townsend have been appointed to project
manage the design and delivery of the project. UKG have advised the
Levelling Up Fund (LUF) spend deadline may be extended to 31
March 2028. The Clydesdale Way delivery programme will be
reviewed and updated accordingly.
Shawfield: Clyde Gateway have commenced delivery of the project,
with the original programme on schedule as at 31 March 2025. The UK
Government has released £5,369,204 to date covering expenditure to
the end of quarter one 2026/27. Clyde Gateway will continue to
monitor the remainder of the programme in line with the UK
Government revised guidance on the spend deadline.
Green
Page 26
87

Page 88

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Positively enhance the
benefits of tourism
across South
Lanarkshire by
delivering the very best
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of South Lanarkshire Tourism Strategy (2022-2025)
The Annual Report was presented to Community and Enterprise
Resource (CER) Committee in April 2024.
An update report will be presented to the Community and Enterprise
Committee once the future approach to a Visitor Levy is in place.
Complete
for our visitors, our
businesses, our people,
our communities, and
our environment
Begin the refresh of the South Lanarkshire Tourism Strategy
for 2025-2028
An update report will be presented to the Community and Enterprise
Committee once the future approach to a Visitor Levy is in place. It is
not possible to refresh the strategy for the next 5-years in the absence
of this.
Report Later
Champion the social
enterprise sector and
invest in start-up and
growth of our local
social enterprise
Prepare an annual progress report on the Social Enterprise
Strategy approved in May 2023 for Community and
Enterprise Resources Committee
The actions contained in the Strategy continue to be delivered via a
partnership approach with oversight and reporting via a steering group
chaired by Voluntary Action South Lanarkshire. A report has been
prepared for Community and Enterprise Resource Committee detailing
progress against objectives and this will be reported through the first
available committee meeting. Mainstreaming of social economy
business support via Lanarkshire Business Gateway (BG) has been
prioritised since the BG service has been brought in house and is now
delivered directly by the Council.
Complete
Page 27
88

Page 89

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Income generating
projects will be scoped
across all council
resources to identify
viable projects with a
focus on green
initiatives including
exploring options for
delivery and funding
Liaise with all Council resources, third parties and funders to
identify new opportunities for generating income and
consider a risk analysis of each opportunity
This is an ongoing activity and a report was presented to the
Executive Committee on commercial opportunities in December
2024.  A further paper was reported to the Corporate Management
Team (CMT) on 29 April 2025, and thereafter presented to
Executive Committee on 25 June 2025.
Green
Develop single door
approach to economic
development and inward
investment activity which
links employment, skills,
business support and
planning
Undertake activity (i.e. Lanarkshire Business Events website
/ supports to national themed weeks i.e. women in business
week) aimed at increasing the number of companies
engaged with partners which lead to improved performance
and turnover, increased employment, innovation, investment
and internationalisation
Business engagement, including face to face engagement, continues
to be undertaken. Visits to businesses supported via grants being
carried out.
Green
Consult with community
organisations and
develop a Rural Action
Plan maximising existing
and future funding
through Community Led
Local Development and
Renewable Energy
Fund
Deliver the Rural Action Plan and report to Rural Task Force
in November 2024.
The Rural Action Plan was reported to the Rural Task Force (RTF) in
2023. It was agreed with the chair not to report to the RTF in
November 2024. Work is progressing on the priorities within the Rural
Action Plan. Renewable Energy Fund (REF) funding is now aligned to
the plan and can support initiatives that progress with rural priorities
such as developing the community transport pilot, and providing
support for asset transfers and community ownership.
Green
Page 28
89

Page 90

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Thriving town and neighbourhood centres provide a focal point for local communities
Action Measures Comments/ Progress Status
Complete East Kilbride
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment.
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
The East Kilbride masterplan is progressing at pace with legal
agreements close to completion, South Lanarkshire Council approvals
and City deal approvals are in place. A project team has been
appointed and a project board has been established.
Green
Complete Hamilton
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
Funding is in place to move forward with the Hamilton Town Centre
masterplan following the approval of funding in the Council budget of
£8m.
It is anticipated that a report will be taken to the Community and
Enterprise Resource Committee in August 2025 setting out the
proposals.
Green
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrives
Action Measures Comments/ Progress Status
Deliver effective
Employability Services
to support individuals
and business
Monitor and adjust the delivery plan agreed via the South
Lanarkshire Local Employability Partnership (SLLEP) and
Community Planning Partners
The Local Employability Partnership continues to meet regularly to
review and agree the Annual Investment Plan for the year ahead.  The
subgroups also meet regularly to look at provision/delivery gaps.
Green
Page 29
90

Page 91

IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System Report printed on Friday 13 June 2025
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Delivering the plan and achieving best value
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Implement the Frontline
First Fund
Identify and implement a programme of projects to deliver
the Frontline First Fund
Year two of the three-year (2024-25) Frontline First Fund (totalling
£3.5m) is fully implemented. Includes improvements to roads
drainage through a gully cleaning and drainage repairs programme,
refurbishment of Carluke marketplace, remodelling and
relandscaping of Blantyre miner’s monument, ongoing repair of
Lanark Loch walkways, and shrub bed removal at Westwoodhill,
East Kilbride.
The service retained seasonal workers over the winter period
allowing grounds teams to deliver additional environmental
improvement works across South Lanarkshire.
Green
Page 30
91

Page 92

92

Page 93

Appendix 3 
Community and Enterprise Resource Plan: Quarter 2 to Quarter 4 2024/2025 -
scrutiny of change in measure status 
Measure Q2 Status Q4 Status Q4 Comments
Performance has declined from Q2 to Q4 
Percentage of total
household waste that
is recycled in 2024
Amber Red The annual household waste recycling figure is
below target.  
The inability to now recycle Waste Upholstered
Domestic Seating (WUDS) means that this type of
waste must be incinerated.  This is having an
impact on the amount of bulky waste that is
recycled.  The full extent of the impact is not yet
known, but information will be provided when
available. 
Percentage of our
road network that
should be considered
for maintenance
treatment (Roads
Condition Index)
Report
Later
Red The actual figure for 2023/25 of 32.5% indicates a
regression of 0.6% of the amount of our road
network in an amber or red status compared to
2022/24.  Deterioration is also showing across
individual road categories to a similar extent. 
It is hoped that following the budget
announcement in February 2025 to increase
capital funding, we will be able to stabilise the
condition of the network in the coming years. 
Number of new South
Lanarkshire business
starts supported by
Business Gateway
Amber Red This year represents a transition for the Business
Gateway, changing from a contract based
external provider model, to an in house model
which will reflect a more customer focused, rather
than target driven, delivery model. The transition
led to a significant disruption to the service. 
Through the revised customer focused service
approach appropriate target levels will be
established going forward.
Implement projects
approved within the
Vacant and Derelict
Land Fund framework
agreed for 2024/25
Green Amber There has been no spend implemented at
Langlands West site due to data centre developer
interest.  
Design team fees have been incurred in relation
to Cathcart Road industrial development, but
construction tender delayed until Summer 2025. 
Measures still awaiting results 
Measure Q4 Status Q4 Comments
All P6s and P7s to
receive free school
meals in line with
Scottish Government
timescales
Report
Later
Awaiting confirmation from the Scottish Government of when the
expansion of free school meals for all primary six and seven
pupils will be rolled out. 
8
93

Page 94

Measures still awaiting results 
Begin the refresh of
the South Lanarkshire
Tourism Strategy for
2025-2028
Report
Later
An update report will be presented to the Community and
Enterprise Committee once the future approach to a Visitor Levy
is in place. It is not possible to refresh the strategy for the next 5-
years in the absence of this.
Percentage of
procurement spend
on local enterprises
Report
Later
This is a local government benchmarking framework indicator.
The figure for 2024/25 will be reported as part of the LGBF
framework in early 2026. 
94

Page 95

Report
Agenda Item 
Report to:  Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025 
Report by: Executive Director (Community and Enterprise
Resources)
Executive Director (Finance and Corporate Resources)  
Subject:  Primary School Expansion of Free School Meals -
Scottish Child Payment 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide a brief update on the expansion of free school meals for eligible primary
school children entitled to Scottish Child Payment (SCP) provided by the Scottish
Government
 seek approval to increase the establishment on a permanent basis for Facilities
Services employees to support and promote the expansion free school meals
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation:- 
(1) that the content of the report, be noted; and
(2) that the permanent increase to the establishment, as detailed in section 6 of this
report, be approved. 
3. Background
3.1. In 2025/2026, the Scottish Government provided £37m to assist with the school meal
costs of the next phase of the free school meals programme. This consists of the £16m
added to the School Meals Grant Aided Expenditure (GAE) line for this expansion in
2023/2024, the additional £6m provided in 2024/2025 and an additional £15m for
2025/2026 Primary 6 and 7 in receipt of SCP from February 2025 and has previously
provided funding to support the capital works, one off revenue costs and recurring
revenue roll out from February to end March 2025.  
3.2. South Lanarkshire Council received capital funding of £0.4m for kitchen/dining
expansion for four schools across 2023/2024 and 2024/2025.  All four of these projects
have been completed. 
3.3. The data received from Social Security Scotland advised that there would 1,728
Primary 6 and Primary 7 pupils eligible for a free school meals (FSM) aligned to the
SCP for South Lanarkshire. Due to the lack of a data sharing agreement between
Scottish Government and Department of Work and Pensions this figure could not be
broken down to school level. 
3.4. South Lanarkshire Council has received total revenue funding of £2.184 over the last
3 financial years to deliver this free school meal expansion programme from
February 2025. 
9
95

Page 96

4. Progress
4.1. South Lanarkshire Council implemented FSM for those children entitled through SCP
from 20 February 2025 via a local arrangement for registration. This was due to data
sharing arrangements not being in place until 19 May 2025, and we are awaiting the
data of the newly eligible children to implement auto-enrolment. This will allow a more
targeted approach with communication being sent direct to parents/carers who have
not manually registered. 
4.2. Revenue budget for 2025/26 has been re-aligned and funds allocated to cover the
additional food costs and supplies and services and allocation to cover anticipated
loss of income. 
4.3.  Due to the delayed start and lack of information on number of children involved, there
has been a soft start to the implementation. Additional staffing is now required for the
new term in August 2025 where we expect the full roll out. Details of posts and costs
are covered in sections 5 and 6. 
5. Proposal for additional staffing
5.1. To support the implementation and roll out of the policy, the additional staffing
requirements are shown below:-
 8 x 10hr Catering Assistants, these posts will be allocated initially to area cover to
support the catering function delivery at site. These posts will also reduce
requirement for plain time additional hours staffing cover.
 2 x 30hr Assistant Cook in Charge, these posts will be allocated initially to area
cover to support the Cooks in Charge at site. These posts will also reduce
requirement for plain time additional hours staffing cover.
 3 x Assistant Facility Officers to work with education, parents and carers to
maximise the uptake of the national policy and of free school meals in general.
They will also provide menus and monitor compliance of the Nutritional
Requirements for Food and Drink in Schools (Scotland) Regulations 2020 and
support growing number of children requiring an adapted diet for medical or
cultural needs. 
6. Employee Implications
6.1. The proposal to recruit the following staffing for the delivering of the expansion of the 
free school meal programme from August 2025 are detailed in table below: 
Post 
Number of
Posts
(Headcount)
FTE 
Grade/SCP
Hourly
Rate
Annual
Salary
(37
hours)
Gross
Cost inc
on costs 
Catering
Assistant
(Term
Time)
8 2.16 Grade 1 level 1,
SCP20
£12.82 £24,732 £62,833
Assistant
Cook in
Charge
(Term
Time)
2 1.62 Grade 1 level 2,
SCP 22-23
£13.12
-
£13.26
£25,311 
- 
£25,581
£40,190 
- 
£40,618
Assistant
Facilities
Officer
3 3 Grade 2 level 2,
SCP 39 - 40
£15.90
-
£16.10
£30,674 
£31,060
£108,126
-
£109,486
Total       £211,149
-
£212,937
96

Page 97

7. Financial Implications
7.1. Funding for the posts will be met from the revenue budget of £2.184m, as noted in
paragraph 3.5 above. The total cost of additional staffing to deliver the policy is
£0.212m and will be met by the additional revenue budget already received from the
Scottish Government. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in terms
of the information contained within this report. 
9. Other Implications
9.1. There are no other significant risks or other implications associated with the content
of this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required. 
10.2 Data on the above supports and services is gathered regularly and presented to
stakeholders and the Scottish Government. 
David Booth
Executive Director (Community and Enterprise Resources) 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Excellent employer
 We will work to put people first and reduce inequality
 Our children and young people thrive
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
  None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kevin Carr, Head of Facilities Waste and Grounds
Ext: 4708 (Phone:  01698 454708)
E-mail: Kevin.Carr@southlanarkshire.gov.uk 
97

Page 98

98

Page 99

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)
Executive Director (Finance and Corporate Resources)  
Subject: Packaging Extended Producer Responsibility (pEPR)
Funding and Waste Investment 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the committee with an update on the packaging extended producer
responsibility scheme (pEPR)
 advise the committee on the scope of the pEPR payments, the assessment
process and the potential future implications for the Council
 advise the committee of the proposal to use a proportion of 2025/2026 pEPR
payment to establish a dedicated team with remit to improve household waste
management services in South Lanarkshire
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report, be noted;
(2) that the proposal to utilise £0.610 million of the 2025/2026 pEPR funding to
establish a dedicated team funded for 2 years (section 6.2), be approved; and
(3) to note that the financial implications referred to at sections 8.2 and 8.3 will be
considered as part of the 2025/2026 Revenue Budget Monitoring report to the
next Executive Committee (August 2025). 
3. Background
3.1. Sustainable waste management practices are an integral part of the Scottish
Government’s goal to move towards a more Circular Economy. To facilitate the
significant change required to the meet the Circular Economy goals, the Scottish and
UK Governments are in the process of implementing new policies and legislation
aimed at driving improvements in waste management. 
3.2. In February 2025, an update on new waste policies and legislation was presented to
Community and Enterprise Resources Committee. A summary of these key policies
and pieces of legislation are outlined in Sections 3.3 to 3.5 of this report.    
10
99

Page 100

3.3. The Circular Economy and Waste Route Map (‘Waste Route Map’) sets out the
strategic direction for waste management in Scotland until 2030 and includes the
commitment to publish a statutory Code of Practice (CoP) on Household Waste as
well as introducing statutory recycling and re-use targets for local authorities.  It is
expected that the new CoP will require the Council to make significant changes to
collection services to drive improvements in recycling rates. 
3.4. The Waste Route Map also supports the decarbonisation of waste disposal by
renewing the Scottish Government’s commitment to include Energy from Waste (EfW)
facilities (such as the facility in Dunbar where the Council’s residual waste is treated)
in the Emissions Trading Scheme (ETS). The scheme is still being developed for
waste, but once implemented, it will place a significant additional financial burden on
local authorities in Scotland. The cost of the ETS could be mitigated if the Council
adopted policies aimed at reducing the overall tonnages of residual waste and/or
reducing the plastic content of the waste. 
3.5. The Producer Responsibility Obligations (Packaging and Packaging Waste)
Regulations 2024 ‘the regulations’ came into force on 1 January 2025. The
regulations, which established an extended producer responsibility for packaging
waste (pEPR), were specifically designed to drive producers of packaging waste
towards reducing the amount of packaging waste produced whilst also increasing the
recyclability of products they place on the market. 
3.6. The pEPR scheme is being managed across the United Kingdom by the Department
of Environment, Food and Rural Affairs (Defra). The aim of the scheme is to ensure
that producers pay for the collection and disposal of all packaging materials they put
on the market. Through the scheme, local authorities are reimbursed for reasonable
costs incurred by them when collecting and disposing of packaging materials. 
3.7. In late November 2024, the Council received a ‘notice of assessment’ from Defra,
estimating that the Council was due a payment of £7.779m for managing packaging
waste during financial 2025/2026. In future years, the payment, which is subject to
change, will be paid directly to the Council, quarterly in arears, but the first payment of
£3.9m (two instalments) is scheduled for November 2025. 
3.8 On 10 July 2025, the Council received a further Notice of Assessment, this time from
Pack UK (the Scheme Administrator), advising the Council the new payment estimate
was £7.716m. Although this is just over 1% less than previous estimate, it compares
favourably to other local authorities in Scotland, where the average payment has been
reduced by 9% across all 32 local authorities. 
3.9. The Scottish Government has confirmed that the pEPR payment to local authorities in
2025/2026, will be in addition to existing local authority budgets; however, there is an
expectation that the money should be used to improve recycling rates and reduce
carbon emissions. To date, the Scottish Government has yet to confirm whether the
block grant that councils receive each year will be adjusted by the value of pEPR
payments that councils will receive separately direct from Defra. 
100

Page 101

4. Scope of Payments and Assessment Processes
4.1. The pEPR payment referred to at Section 3.7 and 3.8  is intended to cover the
estimated net efficient costs associated with collection of household packaging waste
from kerbside collections, bring sites and Household Waste and Recycling Centres
(HWRCs). The cost of managing packaging waste in litter, or in litter bins, is not
included in the payment for 2025/2026. The calculated costs are net of any income
received for the sale of materials. 
4.2. To allow the Scheme Administrator (SA) to calculate the payment due each year, local
authorities are required to complete and submit a detailed annual return. In March of
this year, the Council was asked to assist Defra in the development of a Fees and
Payment Calculator to be used to calculate local authority EPR payments. The
exercise involved providing detailed cost and performance information. The exercise
was time consuming and resource intensive for the Waste and Finance teams;
ultimately not all the information requested could be provided. It highlighted; however,
that the Council does not currently collect the information at the appropriate level of
granularity needed for future returns to the SA. 
4.3. Once the detailed information has been submitted by the Council, it must be assessed
by the SA. Chapter 4 of the regulations sets out how the SA will assess local authority
costs and refers to ‘efficient’ and ‘effective’ waste management services. 
4.4. The regulations state that a waste management service is deemed to be efficient if
disposal costs are as low as reasonably possible, taking in to account the waste
management service provided by the authority. The definition of efficient also refers to
local authority specific factors which are likely to affect its disposal costs (e.g. rurality). 
4.5. The regulations also oblige the SA to undertake ‘effectiveness’ assessments by no
later than 2028. When assessing for effectiveness, the SA can consider certain
factors, such as the total amount of packaging waste present in household waste;
recycling rates for packaging materials, the type of service provided by the local
authority; the services provided by comparable local authorities; and the level of
compliance with statutory and non-statutory codes of practice.   
4.6. If the SA determines that a local authority does not provide an effective waste
management service, a notice is served on the local authority, setting out the reasons
for the SA’s decision and giving the authority time to improve the service. If, on expiry
of the notice, the service has not improved then the SA is entitled to reduce the pEPR
payment to the local authority by up to 20% of the total amount. 
5. Potential Implications for South Lanarkshire Council 
5.1. Whilst detailed effectiveness assessment criteria have yet to be published, it is
anticipated that local authorities will be required to comply with requirements of the
Waste Route Map, particularly in relation to the forthcoming mandatory Code of
Practice on Household Waste before their services are deemed to be ‘effective’. 
5.2. It is expected that the Council will need to make significant changes to refuse collection
services to comply with the CoP. The biggest focus is likely to be on reducing residual
waste capacity for householders. This is because it is acknowledged that reducing
residual waste capacity encourages householders to recycle more. 
101

Page 102

5.3. The results of the Council’s most recent waste composition study (completed in July
2023) show that that two thirds of the waste in the household residual bin could have
been recycled. This highlights that the majority of households in South Lanarkshire
could cope with significantly less capacity than the 120L per week they are currently
provided with as standard; however, introducing smaller bins or reducing collection
frequencies will require extensive consultation, communication and planning. 
5.4. As referred to in Section 3.4 of this report, the inclusion of EfW in the ETS is anticipated
to place a considerable financial burden on the Council’s budget. However, costs could
be mitigated by reducing the amount of residual waste needing to be treated at the
EfW. Increasing recycling rates for plastics, means there is less plastic in the residual
waste bin, which again helps to minimise financial risk. 
5.5. In summary, improving recycling rates and complying with the forthcoming CoP will
have environmental and financial benefits for the Council; however, the changes
required are substantial and cannot be resourced from the existing waste employee
establishment. 
6. Proposal
6.1. Given the scale and complexity of the service changes required, it is proposed that a
new team, with a strategic remit for waste, is established on a permanent basis.  The
team would be responsible for delivering a range of projects aimed at ensuring the
council is best placed to comply with the new statutory obligations. Examples of
projects that would fall under the remit of the team are set out in section below. 
 A review of the current arrangements for the thermal treatment of residual
municipal waste to mitigate the Council’s liability under the new ETS. The current
contract ends on 31 March 2027, albeit there is the option to extend for five years
if this is confirmed as representing Best Value for the Council. The team would
consider options such as working with the current contractor to mitigate financial
liability through service improvements, or by investing in new technology. The
team would also consider any potential opportunities associated with re-
tendering the contract. 
 Identify, develop and implement proposals to ensure the Council complies with
the new statutory Household Recycling Code of Practice, which is due to be
published by the Scottish Government in March 2026. The team would also
represent the Council on sector working groups, such as the group that is being
set up by the Scottish Government to co-design the new CoP. 
 Identify, develop and implement proposals to improve local waste infrastructure
to increase potential for competition in waste contracts and provide contingency
for events such as contractor failure. 
 Identify opportunities to work with the community and the third sector to develop
and implement re-use initiatives, aimed at reducing the amount of waste
disposed of at EfW facilities as well as working towards meeting future Scottish
Government statutory re-use targets. 
 Identify opportunities for external funding to support proposals to improve
recycling and re-use rates and assist with plans to develop new infrastructure for
refuse collection.  
102

Page 103

 Improve waste education opportunities, develop waste communication plans,
and promote sustainable waste management and behaviour change. 
 Undertake a review of waste data collation to ensure accurate statutory reporting
to regulatory authorities including the quarterly mandatory waste data flow
submissions to Scottish Environment Protection Agency (SEPA) 
 Collaborate with colleagues in central Finance to ensure the returns submitted to
agencies such as the Improvement Service and Defra, accurately reflect the
expenditure incurred by the Council when delivering refuse collection and
disposal services. 
6.2.  It is proposed that the team would comprise of one Adviser, two Officers and 2
Assistants. In addition, support of 0.5FTE Accountant is also required.  Total annual
cost is estimated at £0.305m.  £0.610m of the current 2025/2026 funding will be set
aside to meet these costs for a 2-year period. 
6.3. Due to difficulty recruiting, it is suggested that the posts would be recruited on a
permanent basis.  It is hoped that clarification on pEPR funding going forward will
mean more permanent funding is available. If not, a review will be undertaken to
consider opportunities to mainstream the costs of the team within the Council’s
revenue budget.   
7. Employee Implications
7.1. It is proposed to increase the establishment of Waste Services on a permanent basis
as follows:-  
8. Financial Implications
8.1. The annual cost of the proposal is £0.305m per annum and a total of £0.610m over 2
years. It is proposed that the costs for these 2 years are met from the pEPR funding
referred to at Section 3.7 of the report. If there is a recurring need for these staff costs
beyond the 2 years, this will be considered as part of the revenue budget strategy
process and would increase the savings requirement in the year 2027/2028.  
Post Title Proposed
No of
Posts
Grade/
Level
SCP
Range
Hourly
Rate
Annual
Pay
Total
Annual
Cost
(including
on costs) 
Waste
Strategy
Adviser
1 Grade 4
Level 2-5
82-88 £27.88-
£30.50
£50,878-
£55,659
£65,989-
£72,190
Waste
Strategy
Officer 
2 Grade 3
Level 2-4
63-74 £21.50-
£24.76
£39,235-
£45,184
£101,776-
£117,207
Waste
Strategy
Assistant
2 Grade 2
Level 1-3
34-48 £14.93-
£17.51
£27,245-
£31,954
£70,674-
£82,889
Accountant 0.5 Grade 3
Level 2-8
63-80 £21.50-
£27.07
£39,235-
£49,400
£25,444-
£32,036     
Total £263,883 –
£304,322 
103

Page 104

8.2. The remaining pEPR funding of £7.106m will be allocated to the Community and
Enterprise budget for costs associated with the collection of household packaging
waste as required by the scheme.  By funding these core Council costs already being
incurred by the Resource, this will release core Council budget in 2025/2026 only.  As
noted in section 3.9, there is no certainty of funding beyond 2025/2026 and there is a
risk that the Scottish Government may make downward adjustments to the Local
Government Settlement in 2026/2027 to reflect the extra monies coming from Defra.     
8.3. Core Council budget in 2025/2026 can be used to support the wider Council pressures
detailed in the 2026/2027 to 2027/2028 Revenue Budget Strategy report to Executive
Committee in June.  This will be considered in the next Revenue Budget Monitoring
report to the Executive Committee in August 2025. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The policies and legislation referred to in this report are aimed at promoting
sustainable waste management practices, increasing recycling and reuse
opportunities and reducing the amount of waste being treated in Energy from Waste
facilities or disposed to in landfill. 
10. Other Implications
10.1. There are no other significant risks or other implications associated with the content
of this report. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact assessment
or consultation is required. 
David Booth
Executive Director (Community and Enterprise Resources) 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
24 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities 
104

Page 105

Previous References
 Community and Enterprise Resources Committee report on 25 February 2025 entitled
‘Waste Policy Update’
 Executive Committee report on 25 June 2025 entitles ‘2026/2027 to 2027/2028
Revenue Budget Strategy’ 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Kevin Carr, Head of Facilities, Waste and Grounds Services
Tel:  01698 454708
E-mail:  kevin.carr@southlanarkshire.gov.uk 
105

Page 106

106

Page 107

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Hamilton Town Centre Masterplan Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee on the progress of the Hamilton Town Centre Masterplan
 update Committee on the potential surrender of the Regent Shopping Centre
ground lease
 outline projects being scoped for the first stage of investment in Hamilton Town
Centre
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
(1) that the update on the work on the masterplan delivery be noted;
(2) that the request for the potential surrender of the ground lease on Regent
Shopping Centre to facilitate delivery of the masterplan be noted; and
(3) that the projects being scoped for the first stage of investment in the masterplan
be approved.
[1recs]
3. Background 
Hamilton Masterplan
3.1. As noted at the Executive Committee of 21 February 2024, Hamilton Town Centre has
faced a number of challenges over recent years resulting in significant voids -
especially throughout the two shopping centres. The change in retail dynamics led to
the development of the Hamilton Town Centre Masterplan, a town centre vision led by
Threesixty Architecture on behalf of the Council, which demonstrates the physical and
spatial moves required to deliver a re-energised and resilient town centre. The
masterplan seeks to find solutions to underperforming parts of the core town centre
area with focus on: 
 Regent Shopping Centre
 New Cross Shopping Centre
 Former Bairds Department Store
 Duke Street Car Park
 Former Vogue Bingo Site
 Hamilton Town Square  
11
107

Page 108

3.2. The draft masterplan was approved by Executive Committee on 21 February 2024. A
public consultation was held in March 2024 with over 900 responses received. The
Masterplan was updated in accordance with consultation feedback. 
4. Masterplan Update 
Regent Shopping Centre
4.1. The Centre was placed on the market in Autumn 2024 through owner Maration’s
agents, Lambert Smith Hampton (LSH). Following an assessment of the offers
received, they progressed a sale with Parial Ltd. The approval of the masterplan was
fundamental in supporting this sale and it is clear that without this commitment by the
Council it is highly unlikely that a purchaser would have been identified. 
4.2. In order for the transfer of the Centre be completed, the Council was required to give
consent under the terms of the lease which Executive Committee approved on 30 April
2025. 
4.3. The purchaser is committed to working with the Council to deliver the masterplan
vision and officers remain in positive dialogue with the new owner. With the sale
concluded, the purchaser is now seeking the surrender of the ground lease from the
Council in order to deliver the next phase of the masterplan. The surrender of the
lease will be essential to deliver the masterplan vision and officers are carrying out the
appropriate valuations and legal work to inform a further report which will be presented
to Executive Committee and Community and Enterprise Resources Committee in due
course. 
New Cross Shopping Centre
4.4. The Council took control of the New Cross Shopping Centre in 2021 when the ground
tenant went into administration. The Centre is not commercially viable and has
significant outstanding maintenance which the Council inherited from the previous
operator. One tenant currently remains operational in the centre. Officers in Economic
Development have concluded feasibility work as the first stage of works for delivery of
future redevelopment proposals. Work is currently being instructed to take this work
to the next stage of design development, demolition and potential disposal. This will
be reported to Committee in due course. 
Former Bairds Building
4.5. The sale of this building is in its final stages. The potential developer is in positive
dialogue with Council officers to regenerate this key town centre site. On 30 April 2025,
the Executive Committee approved to waive the Council’s pre-emption right over the
building to allow the sale to conclude. 
Duke Street Car Park 
4.6. The masterplan shows a new car park and the potential for student/hotel
accommodation on this site. Feasibility work to develop the proposals to the next stage
will be progressed by officers. 
Former Vogue Bingo Site
4.7. In May 2025, Building Standards obtained three independent surveys of the structure
from different perspectives (valuation, structure, and heritage) and the conclusion of
each report was that the building is in an unsafe condition and that demolition is
recommended. As a result, a Dangerous Building Notice was served on the Council
on 17 June 2025 in line with relevant regulations.  
108

Page 109

4.8. The building has a financial link to the Common Good and Legal Services have been
considering the implications of this on the ability to demolish and what requirements
need to be met before demolition can take place. 
4.9. Following the serving of a Dangerous Building Notice, an application must be made to
Historic Environment Scotland (HES) to remove the Listed Building designation
(Grade B). A Listed Building Application is being prepared and will be submitted for
the demolition of the façade. This will be subject to a public consultation period in
which objections can be received from the public. 
4.10. The Dangerous Building Notice gives the option to reinstate or demolish the facade.
Given the extent and cost of reinstatement required, coupled with the fact that securing
development on the site has historically been unsuccessful over a period of 28 years,
with interested parties quoting the façade as a barrier to development, demolition is
considered the only feasible option. 
4.11.  A demolition contractor is being procured and, subject to approval, demolition could
take place during September 2025. A Method Statement will be prepared by the
demolition contractor, but works are likely to involve road/footway closures. 
4.12. Given a gap site will be created on completion of the demolition, it is proposed that a
fence and a landscaped edge be created whilst redevelopment options for the site are
considered. 
Hamilton Town Square
4.13. This project was granted £100,000 from the Common Good fund to progress to the
next level. An external Project Management Team has been appointed to take this
project forward to RIBA Stage Two. Brown and Wallace have appointed a team of
sub-consultants to work on the project including Page and Park Architecture and
Stantec Engineers. 
Quarry Street Reopening
4.14. A key project generated from Hamilton BID liaison was the reopening of Quarry Street
to traffic as requested by the business community. After an 18-month trial the project
has been deemed successful and as such will remain in force.  
5. Town Centre First Programme of Works
5.1. As part of the 2025/2026 Budget, £8m has been approved for the first stage of
investment in Hamilton Town Centre based around a ‘Town Centre First’ programme
of works and masterplan delivery. Projects which are being scoped are: 
Project  Description
Bairds/Regent
Centre
Potential contribution to demolition costs of Bairds/part of
Regent Centre (subject to subsidy control) to expedite
masterplan delivery.
New Cross Centre Demolition subject to resolution with the remaining lease. 
Town Square Develop costed proposals for new Town Square Park to
RIBA stage 3.
18 – 22 Quarry
Street
Potential acquisition of vacant/derelict site. This site is
privately owned and is in a prominent position in the town
centre. 
Hamilton HUB
replacement
Consideration to replacement facility.
109

Page 110

Vogue Demolition works and formation of a development site to
bring the land back into economic use.
Train Station
Pedestrian link
Enhancement to pedestrian link. 
Environmental Task
Force
Enhanced cleaning, litter picking, graffiti removal etc
Feasibility Studies To support demolition of Duke Street Car Park and New
Cross Centre
Events Programme Events/marking programme to be developed and
delivered in conjunction with Hamilton BID and South
Lanarkshire Leisure and Culture. 
6. Common Good Considerations
6.1. It should be noted that some of the Council owned assets identified for development
as part of the masterplan have been purchased using Common Good funding. The
legal and financial implications of this are being fully considered and steps may need
to be taken which could add a time value to masterplan delivery. 
7. Employee Implications
7.1. Workloads associated with the delivery of both the East Kilbride and Hamilton
Masterplans have generated the requirement for four additional posts with the
recruitment process underway. Legal, valuation and other technical work will be
completed with support from external advisors under existing and new appointments. 
8. Financial Implications
8.1. As part of the 2025/2026 Budget, £8m has been approved for the first stage of
investment in Hamilton Town Centre based around a ‘Town Centre First’ programme
of works. These projects are currently being scoped, however, several have third party
issues and are, therefore, not entirely within the gift of the Council to deliver.
Discussions are taking place with the new owner/s of the Regent Centre and Bairds
to understand their proposals and timeline. 
9. Climate Change, Sustainability and Environmental Implications
9.1. The masterplan has sustainability at the forefront and projects will be taken forward in
line with the Council’s sustainability objectives. 
10. Other Implications
10.1. The risks associated with not supporting the masterplan is that Hamilton Town Centre
will continue to decline if no action is taken. This will result in a process of managed
decline rather than investment for growth. 
10.2.  The Council could face reputational damage if it is not seen to actively support and
encourage investment in the town centre. 
10.3. There is a risk to project timescales due to the Common Good status of some assets
and the implications of this. 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Impact
Assessment is required. 
110

Page 111

11.2.  As noted above, a public consultation on the masterplan was undertaken by Enterprise
and Sustainable Development Services. Consultation with a range of other Council
services who have an ongoing role in delivery of the masterplan will continue. 
11.3. Further community consultation will be undertaken as key milestones of the
masterplan delivery are reached and statutory processes require. 
David Booth
Executive Director ( Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work towards a sustainable future in sustainable places
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres 
Previous References
Executive Committee, 21 February 2024 - Hamilton Town Centre Masterplan 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Iain Ross, Economic Development Manager
Via MS Teams
E-mail: Iain.ross@southlanarkshire.gov.uk 
111

Page 112

112

Page 113

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Scottish Government Vacant and Derelict Land Fund
Programme 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of progress made during 2024/2025 in implementing the South
Lanarkshire Delivery Plan for the Scottish Government financed Vacant and
Derelict Land Fund (VDLF) and to agree the VDLF Programme for 2025/2026
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the progress made during 2024/2025 in delivering the agreed Vacant and
Derelict Land Fund Programme in South Lanarkshire be noted; and
(2) that the allocation of funds in the 2025/2026 Vacant and Derelict Land Fund
Delivery Plan, as set out in paragraphs 5.1 and 5.2, be approved. 
3. Background
3.1.  The Scottish Government allocation to South Lanarkshire for the Vacant and Derelict
Land Fund for the financial year 2024/2025 was £425,000. A Local Delivery Plan was
produced and approved by Committee on 26 November 2024 to implement the key
objectives of VDLF which are to:-
 tackle long-term Vacant and Derelict Land
 stimulate economic growth and job creation
 develop a diverse, sustainable environment with a focus on temporary and
permanent greening
 support Communities to flourish and tackle inequalities 
3.2. The Council acknowledges that vacant, derelict, and contaminated land acts as a
major constraint to the re-development of land and impacts on the quality of life of
many residents. 
3.3. The Scottish Government Vacant and Derelict Land Fund is available to a limited
number of local authorities in Scotland including South Lanarkshire Council, North
Lanarkshire Council and Glasgow City Council.  The eligibility criteria for projects
require the following conditions to be met:
 sites have been on the Vacant and Derelict Land Register for a minimum of 15
years
 eligible sites must be more than 0.1 hectares in size  
12
113

Page 114

 VDLF will not support housing related projects on eligible sites
 sites on the Vacant and Derelict Land Register which are privately owned are
subject to Subsidy Control rules on grant support amounts 
3.4. South Lanarkshire’s continued inclusion on the limited list of Councils who are in
receipt of VDLF awards is primarily down to the existence of complex vacant and
derelict sites within the Council area. 
3.5. Other funds such as Place Based Investment Fund, Regeneration Capital Grant Fund
and Vacant Derelict Land Investment Programme have previously been accessed by
the Council and community-based organisations to tackle sites that are vacant and
derelict but may not qualify for support under the VDLF criteria. 
4. Progress Achieved in 2024/2025
4.1. The 2024/2025 Local Delivery Plan was designed to build on work undertaken over 
recent years on key projects located within South Lanarkshire as follows:- 
 Cathcart Road, Rutherglen Industrial Development: The industrial development
site is situated to the west of Rutherglen town centre, within the Burnhill area.  It
lies immediately adjacent to the Clyde Gateway URC area.  The site is owned by
the Council. 
Proposals have now been developed for the vacant site at Cathcart Road,
Rutherglen to create two units offering 620sqm of industrial floorspace, suitable
for subdivision, and incorporating net zero features to make them more
sustainable. 
Project development proposals are now well advanced and, subject to
confirmation by SEPA that site flood risks have been adequately addressed,
planning permission will be progressed. 
The construction tender will be issued later this year and  commence on site in
early 2026 and the project will be funded by a combination of VDLF, UK Shared
Prosperity Fund and the Regeneration Capital Grant Fund. 
 Clyde Climate Forest:  The Clyde Climate Forest (CCF) project identified and
targeted neighbourhoods across the urban area which have low levels of existing
tree canopy, are particularly vulnerable and deemed to be ‘high’ priority sites. 
These sites have been subject to tree planting works funded by VDLF. 
 Cuningar Loop Food Growing Project, Rutherglen: This transformational project at
Cuningar Loop (within the Clyde Gateway URC area) was developed to provide
much needed food growing space in the Rutherglen area. The site development
works were originally held up as a result of delays experienced in implementing
the Cuningar Phase 2 proposals and the completion of the upgrading works to the
car park access road by Clyde Gateway URC. 
The main contract works have now been completed to bring the VDLF investment
in the project of over £800,000.  The allotments will be operational once they have
been allocated to those on the waiting list.  
114

Page 115

5. 2025/2026 VDLF Proposal
5.1. The Scottish Government allocation to South Lanarkshire for the Vacant and Derelict
Land Fund for the financial year 2025/2026 is £528,000.  The following projects have
been identified which comply with the eligibility criteria for the Fund for which approval
is now sought: 
 Clyde Cycle Park Phase 2 (VDLF allocation £400,000): Clyde Cycle Park (CCP) is
an ambitious project that is creating a high-quality combination of cycle circuits on
the vacant/derelict land adjacent to the River Clyde in Cambuslang to promote
community, commuter and competition cycling. CCP has developed the initial
phase of work, which includes a small cycling circuit and associated facilities which
were partly funded by VDLF.  CCP has now developed proposals for a more
extensive circuit and improved facilities which would be only one of three
competitive off-road circuits in Scotland.  The cost of these works is £1.2m
including professional fees and contingency.  CCP has now secured a major
financial package of support worth £1m from SportsScotland with a commitment
from the Council of £200,000 from the 2025/2026 Budget. 
Additional works have however, been identified to complete the project including
fencing around the car park, start/finish line accommodation and utility works. 
These works are currently being designed but it is estimated that they could cost
up to an additional £200,000.  It is proposed that an additional and final allocation
is made to CPP up to a maximum of £200,000. 
As such, due to VDLF budget availability, it is proposed to substitute the £200,000
Budget allocation with VDLF funding and provide an additional award of up to
£200,000 to complete the project. 
Works are due to commence on site in August and be completed by December
2025. 
 Clyde Climate Forest (VDLF allocation £25,000): The Clyde Climate Forest
(CCF) vision is to plant the right trees, in the right places to help nature recover
and thrive, to protect and mitigate against climate change, and to create an
ecologically secure environment for future generations.  More target
neighbourhoods are being identified across our urban area and ‘high’ priority sites
have been identified with the intention that these sites could be suitable for
planting.  We estimate that once the investigation works are complete and tree
planting works are undertaken long term vacant and derelict land will be removed
from the VandD land register. 
5.2. The above projects represent a balanced programme of activities which address
Scottish Government priorities. The allocation of funding on these projects  is
proposed as: 
 £400,000 – Clyde Cycle Park, Cambuslang
 £25,000 – Clyde Climate Forest 
5.3 Projects are currently being identified for the balance of the 2025/2026 VDLF of
£103,000 and will be brought back to a future committee for approval.   
6. Employee Implications
6.1. There are no employee implications arising from this report.  Proposed workstreams
can be managed using existing staff resources. 
115

Page 116

7. Financial Implications
7.1. The VDLF programme will be funded from the Scottish Government Vacant and 
Derelict Land Fund allocation.
7.2. The key risks associated with these projects are focussed on the potential for cost
overruns or delays to the programme. These risks will be managed by Community and
Enterprise Resources.  An appropriate level of contingency funding is included in the
project budgets to mitigate risk. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The initiative identified in this report will be delivered using a range of 
sustainable techniques and models, having regard to best practice and current 
construction industry guidance. 
9. Other Implications
9.1. There are no other implications associated with this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy and, therefore, no 
impact assessment is required. 
10.2. This report has been prepared in consultation with Finance and Corporate Resources. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Caring, connected, sustainable communities
 Good quality, suitable and sustainable places to live
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee 26 November 2024 
List of Background Papers
 South Lanarkshire Council 2025/2026 Proposed VDLF Delivery Plan 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Iain Ross, Economic Development Manager, Enterprise and Sustainable Development
Services
Email: iain.ross@southlanarkshire.gov.uk
116

Page 117

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Revocation of Whirlies (East Kilbride) and Rutherglen
Air Quality Management Areas – South Lanarkshire 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update the Committee on improvements to air quality within the Whirlies (East
Kilbride) and Rutherglen areas and the subsequent proposal to revoke the
Whirlies (East Kilbride) and Rutherglen Air Quality Management Areas (AQMAs)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that it be approved that Planning and Regulatory Services proceed to revoke the
Whirlies (East Kilbride) AQMA; and
(2) that it be approved that Planning and Regulatory Services proceed to revoke the
Rutherglen AQMA. 
3. Background
3.1. South Lanarkshire Council has a statutory duty to monitor the quality of air within its
area. This is defined in the Environment Act 1995 and details are provided within the
Air Quality (Scotland) Regulations 2000 and 2002 as amended. The results of the
monitoring must be considered against the air quality objectives/targets. Should an air
quality objective/target be exceeded the local authority must take action to improve air
quality. Exceedances were previously found in East Kilbride, Rutherglen and Lanark
which resulted in the declaration of three AQMAs for these areas. The Lanark AQMA
was revoked following approval by Community and Enterprise Resources Committee
on 14 March 2023. 
3.2. An AQMA around the Whirlies Roundabout, East Kilbride and extending along the
roads leading into the roundabout was declared in 2008 due to likely breaches of
Particulate Matter (PM10) annual mean air quality objective of 18µg/m3.  A map of the
of the AQMA is attached at the end of Appendix 1. 
3.3.  An Air Quality Management Area (AQMA) in Rutherglen was declared in 2016 due to
likely breaches of Particulate Matter (PM10) annual mean air quality objective of
18µg/m3.  A map of the of the AQMA is attached at the end of Appendix 2. 
3.4.  The formal declaration process for the AQMAs and the resultant Air Quality Action
Plan development was detailed in Committee Reports dated 3 June 2008, 11
November 2008, 8 December 2015 and 19 March 2019.  
13
117

Page 118

3.5. South Lanarkshire Council has supported traffic management and air quality
improvement actions since 2016. 
Whirlies initiatives have included: 
 Three Beat the Street projects which are community game-based projects
aimed at encouraging the uptake of active and sustainable travel for short local
journeys. A link to the most recent project available here: Winners of East
Kilbride’s latest Beat the Street challenge - South Lanarkshire View. 
 Partnership working with Universal Connections in East Kilbride has resulted in
the installation of secure cycle storage, cycle leader training as well as the set
up of a bike library resource to support the uptake of cycling. Some further
information is available here: Cycling has universal appeal - South Lanarkshire
View 
 Improvements to East Kilbride based train stations which will be further
enhanced by the building of the new transport interchange at Hairmyres has
supported the uptake of both active and public forms of transport. More
information is available here: Transport interchange opens at Hairmyres - South
Lanarkshire View 
 New segregated walking and cycling infrastructure has been built in East
Kilbride to support uptake of active travel. 
 South Lanarkshire Council (SLC) has worked in partnership with South
Lanarkshire College to assist in the purchase of a new e-cargo bike to enable
sustainable deliveries across campus including transporting materials for the
horticultural department. Dr Bike sessions have also been supported to assist
staff and students with bike maintenance. 
Rutherglen initiatives have included: 
 Two Beat the Street projects have been delivered in the Rutherglen area with
a third game scheduled for 2025/2026. A video showing the impact of the game
is available here: Lanark & Rutherglen get moving with Beat the Street 
 Junction upgrades to support pedestrians and cyclists have been carried out I
Rutherglen Main Street. More information is available here: Crossing upgrade
benefits pedestrians and cyclists - South Lanarkshire View 
Area wide measures have included: 
 Installation of electric vehicle charging infrastructure at various locations across
South Lanarkshire to support the uptake of low emission vehicles. More
information is available here: Charging for electric vehicles gets a boost - South
Lanarkshire View 
 Anti engine idling campaigns to discourage drivers from sitting with their
engines running especially outside schools and sports venues. Further
information is available here: Engine idling focus for Clean Air Day - South
Lanarkshire View  
118

Page 119

 Eco-Stars is an initiative that supports fleet operators to transition to lower
emission vehicles. More information is available here: South Lanarkshire - ECO
Stars 
 Cycle training has also been provided within our schools. In academic year
2023/2024, there were 42 schools delivering to Bikeability Level 1 and 38
schools training to Level 2 onroad, with one additional school delivering Level
2 style training in the playground. 
 SLC in partnership with Strathclyde Partnership for Transport (SPT) have been
improving facilities at bus stops including providing high quality bus shelters,
making bus stops more accessible, with installation of high kerbs that are at the
same height as the floor of the buses and providing timetable information at all
bus stops. Also installed are real time passenger information along some of the
strategic bus routes, making travelling by bus more convenient and desirable. 
4. Current Position
4.1. East Kilbride (Whirlies)
For the previous three years the Target Air Quality Standard of 18 µg/m3 Scottish
Particulate Matter (PM10)) annual mean objective has not been exceeded at the
Whirlies East Kilbride continuous air quality monitoring station. No PM10 daily means
greater than 50 µg/m3 were measured, which is compliant with the 24-hour short-term
mean objective. 
All annual mean NO2 concentrations measured at automatic and non-automatic
monitoring sites within the East Kilbride area were below the annual mean objective
of 40 µg/m3 and have been below the objective now for more than three years.  No
sites have measured 1-hour mean NO2 concentrations in excess of 200 µg/m3
objective more than 18 times between 2020 and 2023. All measurement sites were
therefore compliant with the 1-hour short-term mean objective. 
An AQMA revocation report for Whirlies was submitted to Scottish Government at the
end of 2024. This report concluded ‘The Whirlies AQMA was declared due to potential
exceedance of the Scottish annual mean objective for PM10. Monitoring data for the
annual mean PM10 as well as the 24-hour short-term mean PM10 objective, the NO2
annual mean objective and the 1-hour short-term mean NO2 objective has been
reviewed. No exceedances of any of the PM10 and NO2 air quality objectives have
been measured for in excess of three years. All monitoring results were significantly
below the air quality objectives giving confidence that future exceedance is unlikely.
On this basis South Lanarkshire are revoking the Whirlies AQMA.’ 
A detailed breakdown of the air quality monitoring data is provided within the
revocation report. A copy of this report is available within Appendix 1. 
4.2. Rutherglen
For the previous three years the Target Air Quality Standard of 18 µg/m3 Scottish
PM10 annual mean objective has not been exceeded at the Rutherglen continuous air
quality monitoring station. No PM10 daily means greater than 50 µg/m3 were measured
which shows compliance with the 24-hour short-term mean objective. 
119

Page 120

All annual mean NO2 concentrations measured at automatic and non-automatic
monitoring sites within the Rutherglen area were below the annual mean objective of
40 µg/m3 and have been below the objective for in excess of three years. No sites
measured 1-hour mean NO2 concentrations in excess of 200 µg/m3 objective more
than 18 times between 2019 and 2023; all measurement sites were therefore
compliant with the 1-hour short-term mean objective. 
An AQMA revocation report was submitted to Scottish Government in January 2025.
This report concluded ‘The Rutherglen AQMA was declared due to potential
exceedance of the Scottish annual mean objective for PM10. Monitoring data for the
annual mean PM10 as well as the 24-hour short-term mean PM10 objective, the NO2
annual mean objective and the 1-hour short-term mean NO2 objective has been
reviewed. No exceedances of any of the PM10 and NO2 air quality objectives have
been measured for in excess of three years. All monitoring results were significantly
below the air quality objectives giving confidence that future exceedance is unlikely.
On this basis South Lanarkshire are revoking the Rutherglen AQMA.’ 
A detailed breakdown of the air quality monitoring data is provided within the
revocation report. A copy of this report is available within Appendix 2. 
4.3. The Council’s Annual Progress Report on air quality together with the revocation
reports for both AQMA’s have been submitted to Scottish Government and Scottish
Environment Protection Agency (SEPA) for appraisal as part of statutory reporting
requirements. Both reports conclude that the Whirlies (East Kilbride) AQMA and the
Rutherglen AQMA should be revoked under section 83(2) of the Environment Act
1995. The findings of both reports have been accepted by Scottish Government and
SEPA. A link to the most recent Progress Report is available here: South Lanarkshire
Council Annual Progress Report 2024 
4.4. In view of the conclusions of the revocation reports and acceptance of the findings by
Scottish Government and SEPA, Planning and Regulatory Services recommends
South Lanarkshire revokes both AQMAs. 
4.5. Following acceptance of the recommendation, the Revocation Order will be drawn up
in conjunction with Legal Services and the Order advertised among statutory
consultees before coming into effect October 2025. 
5. General/Other Implications for the Council
5.1. Where a local authority considers it necessary to revoke an AQMA the Scottish
Government expects the authority to consult SEPA. For the Whirlies (East Kilbride)
and Rutherglen proposed revocations consultations have already taken place. In
addition, it is also expected that the local authority consults statutory consultees,
businesses, members of the public and other interested parties. 
5.2. Once the consultation process has been completed Planning and Regulatory Services
will submit the Revocation Orders to the Scottish Government for information. 
5.3. Where a Revocation Order is accepted, local authorities are expected to consider
drawing up a Local Air Quality Strategy to ensure air quality maintains a high profile
locally and to respond to public expectations. Such a strategy should incorporate
measures designed to tackle climate change and should also cover the linkages
between air quality and wider environmental sustainability issues. Planning and
Regulatory Services has developed a draft Air Quality Strategy and is seeking to fully
adopt this strategy following consultation in 2026. 
120

Page 121

5.4. Planning and Regulatory Services will continue air monitoring across the existing
automatic air stations for a minimum of three years following revocation of the AQMAs
to demonstrate the decision to revoke was justified. Environmental Services will report
this monitoring through the Annual Progress Report to the Scottish Government and
SEPA on compliance with the national air quality statutory objectives. 
6. Employee Implications
6.1. There is no employee implications associated with this report. 
7. Financial Implications
7.1. Advertising costs for the consultation and publicising of the Revocation Orders, will be
met from the existing Service budget. 
8. Climate Change, Sustainability and Environmental Implications
8.1. In accordance with the requirements of the Environmental Assessment (Scotland) Act
2005, a Strategic Environmental Assessment (SEA) is not required as the revocation
of the Air Quality Management Area is not a policy, plan, programme or strategy as
defined by the Act. 
9. Other Implications
9.1. There are no risks or other implications associated with this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no equality impact
assessment or consultation is required. 
David Booth
Executive Director ( Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
121

Page 122

Previous References
 Community Resources Committee 3 June 2008 Air Quality Management Area
 Community Resources Committee 11 November 2008 Air Quality Management Area –
Whirlies Roundabout East Kilbride
 Community Services Committee 8 December 2015 Air Quality Management Area –
Rutherglen
 Community Services Committee 8 December 2015 Air Quality Management Area –
Lanark 
 Community and Enterprise Resources Committee 19 March 2019 Air Quality Action
Planning – South Lanarkshire 
 Community and Enterprise Resources Committee 14 March 2023 Lanark Revocation
Report – South Lanarkshire 
List of Background Papers
 Environment Act 1995
 Air Quality (Scotland) Regulations 2000
 Air Quality (Scotland) Amendment Regulations 2002 and subsequent amendments 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Brown, Environmental Services Manager
Ext:  07795453408
E-mail:  Craig.Brown2@southlanarkshire.gov.uk 
122

Page 123

Appendix 1: Whirlies AQMA Revocation Report 
Whirlies, East Kilbride Revocation of Air Quality Management Area Report
Background 
• Introduction
An Air Quality Management Area (AQMA) around the Whirlies Roundabout, East
Kilbride, between A725, A749 and B783 and extending along all the roads leading into
the roundabout was declared in 2008 due to likely breaches of Particulate Matter (PM10)
annual mean air quality objective of 18µg/m3 
A link to the South Lanarkshire Council Air Quality Management Area Order No.1
(Whirlies Roundabout, East Kilbride) is available here:
https://www.scottishairquality.scot/laqm/aqma/578 
Measured PM10 concentrations have declined over recent years and, on this basis,
South Lanarkshire Council are currently considering revocation of the Whirlies AQMA.
This report aims to provide evidence to support revocation. 
• Legislation
In exercise of the powers conferred upon it by Section 83(1) of the Environment Act
1995 South Lanarkshire declared the South Lanarkshire Council Air Quality
Management Area No.1 (Whirlies Roundabout, East Kilbride)1 which came into effect on
28th November 2008. 
• Summary of proposal
This report presents evidence to demonstrate that air quality objectives are not, and are
unlikely to be, exceeded and as such the Whirlies AQMA will be revoked.   
Description of AQMA 
• Pollutants declared for and time intervals, date declared
The Whirlies AQMA was declared due to potential exceedance of the Scottish annual
mean objective for PM10. The AQMA was declared November 2008. 
• Description and extent of AQMA
The AQMA encompasses the Whirlies Roundabout between A725, A749 and B783. The
AQMA also includes all roads that lead into the roundabout. The AQMA is demonstrated
in map format in Annex A. 
Description of local sources 
• Describe local sources (e.g. traffic, industry)
Baseline emissions inventory work indicated that PM10 emissions arose from road
transport (45%), solvents (18%), waste treatment (13%), other transport and nature
(7%) with remaining emissions attributed to industrial combustion and processing as
well as commercial, institutional and residential combustion.
For NOx the most significant source is road transport (57%) with commercial,
institutional and residential emissions contributing 24% and industrial emissions
123

Page 124

contributing 14%. The remaining 5% NOx emissions were attributed from other
transport. 
More information is available here:  Further Assessment of Air Quality in Whirlies AQMA
(scottishairquality.scot) 
• Action planning measures which have been implemented
Active travel 
‘Love to Ride South Lanarkshire’ was a tailored online behaviour change programme
and platform which ran for eighteen months and has been proven to motivate and
encourage more people on bikes. The project engaged with 35 workplaces and
encouraged 18% of new riders to become occasional or regular riders and 9% of active
occasional riders to become regular riders. More information is available here: Cycle for
fun and prizes this September - South Lanarkshire View 
‘Beat the Street’ projects have been delivered in South Lanarkshire since 2018. This is a
sustainable active travel behaviour change initiative aimed at encouraging residents and
visitors to decrease journeys by car and increase journeys made using more active and
sustainable means of travel. Projects have taken place in Lanark and Rutherglen, East
Kilbride (EK)(x 3), Hamilton and Blantyre, Cambuslang and Rutherglen and within the
Clydesdale area. Over 66,000 people have taken part and community engagement has
ranged between 10 – 17% of the local population. Participants have walked, cycled, or
wheeled over 820,000 miles. Some further information is available here:
https://www.southlanarkshireview.scot/news/article/2411/winners_of_east_kilbride_s_lat
est_beat_the_street_challenge 
‘BetterPoints – Think, Move, Breathe’ is an App based active and sustainable travel
behaviour project that rewards participants for choosing active and sustainable ways of
travelling across South Lanarkshire. More information is available here: BetterPoints -
Think, Move, Breathe. 
South Lanarkshire Council (SLC) has worked in partnership with South Lanarkshire
College, which is based in East Kilbride, to support the expansion of cycling uptake with
students and staff. SLC supported the college in their purchase of a new e-cargo bike
which will enable sustainable deliveries across campus as well as transporting materials
for the horticultural department. Dr Bike sessions have also been supported to assist
staff and students with bike maintenance. 
South Lanarkshire re-launched its ‘Cycle2Work’ scheme and in 2022 agreed that this
scheme would now be an all-year-round project with no closing date for applications.
More information is available here: Cycle2Work 
Cycle training has also been provided within our schools. In academic year 2022-23
there were 67 schools delivering to Bikeability Level 1 and 52 schools training to Level 2
on-road with a further 2 schools delivering Level 2 style training in the playground. 
Ongoing improvements and expansion of the cycling and walking network continued
and a link to the current network is available via online resource linked here: The air that
we breathe story map. An example of the infrastructure improvements in the East
Kilbride area is available here: Improvements underway for Active Travel routes - South
Lanarkshire View 
The East Kilbride branch of Universal Connections participated in a Beat the Street
legacy project aimed at upskilling members of the local community in cycle training.
Nine members of staff and volunteers completed their ‘Train the Trainers Bikeability
124

Page 125

Leaders’ course. This will enable the centre to run essential cycling courses for young
people and the wider community to build their confidence, using cycle lanes safely and
basic bike maintenance to keep their bikes roadworthy. Further information on the
project is available here: Cycling has universal appeal - South Lanarkshire View 
Installation of cycle shelter at Universal Connections East Kilbride, which is part of SLC
Education. Universal Connections works closely with youth and those in the wider
community, and they are working on supporting and encouraging cycling as a viable
travel option. SLC are currently installing a fully segregated cycling infrastructure within
East Kilbride and the installation of the cycling shelter supports Universal Connections in
their endeavours regarding cycling. 
Installation of Public Bike Maintenance stands within Calderglen Country Park (East
Kilbride) and Lanark Country Park to encourage active travel choices by means of
cycling to and from and within the parks within both towns. 
SLC Walking and Cycling Sustainable Travel Promotion. Each year SLC undertake a
publicity campaign with our “Leave the Car at Home” message, and this involves a
variety of publicity formats such as billboard advertising, bus rear advertising and
supermarket digital sheet advertising. 
East Kilbride Active Travel Infrastructure – As part of the EK Active Travel study
undertaken in 2019, community engagement led to a series of routes highlighted for
enhancement for both walking and cycling. Several routes have now been installed
throughout the town including segregated bidirectional cycle lanes with additional
footway provision for pedestrians. 
Improvement in Bus Services – SLC in partnership with Strathclyde Partnership for
Transport (SPT) have been improving facilities at bus stops including providing high
quality bus shelters, making bus stops more accessible, with installation of high kerbs
that are at the same height as the floor of the buses and providing timetable information
at all bus stops. Also installed are real time passenger information along some of the
strategic bus routes, making travelling by bus more convenient and desirable. 
Education
Focused air quality workshops have been delivered to both primary and secondary
school students. 
The ‘On the Move’ project has been delivered in Lanark and Blantyre with work ongoing
to introduce it to the Calderglen area in EK. Primary schools and communities around
Lanark and Blantyre have worked together to inspire locals to travel responsibly for the
environment. More information is available here: On the Move to cleaner air in Lanark -
South Lanarkshire View 
Young sports leaders and S6 students from St Andrews and St Brides High School
(East Kilbride) had an opportunity to be trained as Bikeability Instructors as part of the
legacy work from one of the ‘Beat the Street’ projects. These students are now able to
deliver on road cycle training to primary school children under the Cycling Scotland’s
Training Scheme. Children who are taught this course learn safe cycling skills and road
safety and Highway Code awareness, and basic cycle maintenance checks along with
Eco and Active Travel to improve air quality. 
Conference of Schools (COS1) event – On the back of the Conference of the Parties 26
(COP26) summit event in Glasgow in 2021 young people from all high schools within
South Lanarkshire created a Youth Forum on Climate Change and Sustainability. They
held their first mini-COP event called Conference of Schools 1 (COS1) in 2022 which
125

Page 126

was held over three days at Palace Grounds in Hamilton with more than 500 primary
aged children in attendance. The Youth Forum came up with a theme for the event
“TIERS” which focused on Travelling, Influencing, Eating, Reduce-Reuse-Recycle, and
Shopping. They asked the school attendees to commit to a set of pledges and to raise
awareness across the rest of the schools. A further COS2 event also ran in February
2024 and more information is available:
https://blogs.glowscotland.org.uk/sl/public/primaryscience/uploads/sites/13996/2024/05/
28124907/COS2-Case-Study-final.pdf   
Tackling engine idling 
South Lanarkshire’s no engine idling promotion campaign included banners which are
displayed on a locational rota basis on streetlamps and railings. The campaign
emphasises the effects of poor air quality from engine idling. The refreshed campaign
branding ’30 good reasons to switch off your engine’ and ’11 good reasons to turn off
your engine’ are in use around schools and sports centres. The new branding has been
very well received. An example of the campaign is available here:
https://www.southlanarkshireview.scot/news/article/1304/pupils_switch_on_to_social_to
_ask_you_to_switch_off_your_engine.   
Improvements to vehicle emissions
South Lanarkshire increased the numbers of fuel efficient and electric vehicles within the
council fleet, including pool cars, sweepers, and a minibus, and expanded the public
electric vehicle charging network with 133 charging points now available. Read more
here: Tariff to be introduced for electric vehicle charging – South Lanarkshire View 
An ECO Stars fleet scheme has been running since 2014 and aims to raise awareness
among companies of the important role they can play in helping improve local air quality
by enhancing the performance of their fleet. To date there are 289 members with 10,618
vehicles registered to the scheme. SLC is a member of the scheme. More information is
available here:
https://www.southlanarkshire.gov.uk/info/200193/pollution/263/air_quality/11 
An Eco Stars Taxi scheme commenced in 2021 and has 13 taxi operators with a total of
174 vehicles registered within the scheme. Three Taxi Operators workshops have also
been run as a joint initiative with North Lanarkshire Council. These workshops gave taxi
operators information and advice on the Energy Savings Trust Switched on Taxi loan.
Information on the Low Emission Zone (LEZ) scrappage scheme which is open to
households within 20km of an LEZ was also provided (several towns within South
Lanarkshire fall within this radius). The scrappage scheme provides grants to
households to dispose of non-compliant vehicles. Information was also given on
Glasgow’s LEZ and how it might impact drivers from both North and South Lanarkshire,
as well as showcasing some ultra-low emissions taxis from the Glasgow Taxi Centre. 
In 2020 an Eco Stars Bus Operators workshop was held. This was also a joint initiative
with North Lanarkshire Council to make bus operators aware of the funding incentives
from BEAR (Transport Scotland’s Bus Emissions Abatement Retrofit programme). This
programme aims to fit buses/coaches with Clean Vehicle Retrofit Accreditation Scheme
(CVRAS) accredited retrofit technology measures to support the delivery of Scotland’s
LEZs and neighbouring authorities benefit also by reducing nitrogen dioxide (NO2) and
particulate matter (PM10 and PM2.5) emissions in air. (Please note that PM10 refers to
airborne particulate matter with an aerodynamic diameter of 10µm (micrometres or
microns) or less. PM2.5 refers to airborne particulate matter with an aerodynamic
diameter of 2.5µm or less). Three Bus Operators were successfully signed up to this
programme following this workshop. 
126

Page 127

Traffic signal optimisation has been introduced at key locations where possible within
areas that impact the flow of traffic to and within the AQMAs. The Split Cycle Offset
Optimisation Technique (SCOOT) traffic light system enables groups of traffic signals in
busy areas to work together so that traffic flow is smoother, congestion reduced, and
emissions minimised. 
Funded Vehicle Emissions Testing events have been held during the summer months at
locations that include existing, former, and potential AQMAs. Vehicles were randomly
selected from the traffic and with Police assistance diverted to a safe site, and those
vehicles are tested. These events were delivered in partnership with North Lanarkshire
Council and Police Scotland. These events were exclusively funded by Scottish
Government (SG) grant award and delivered by SLC certified Environmental Health
Staff. 
• Funding
Many of the actions as listed above have been supported through funding awarded via
Scottish Government’s Air Quality Action Plan, Local Air Quality Management as well as
Vehicle Emission Testing and Engine Idling grant funds. Scottish Government’s
previous three air quality funding grant streams have been amalgamated for year 24/25
into Local Air Quality Management as well as Air Quality Resource grant streams.  
Funding support has also been provided by Smarter Choices Smarter Places although
this fund had been discontinued in 24/25. SPT’s Active Travel, People and Places
Funding opened in 24/25 and has supported delivery of some of the projects listed.
South Lanarkshire Council’s Climate Emergency Fund has also been utilised to support
project delivery. 
• Changes to local sources from measures which have been implemented or changes to
local circumstances for emission sources
No singular identifiable change to local sources attributed specifically to action plan
measures has been identified. The full diverse array of measures was aimed at having a
cumulative impact on overall emission levels. 
Local Monitoring equipment 
Automatic 
• Site IDs, designation, address, NGR, dates of operation
Site ID EK0. South Lanarkshire East Kilbride Whirlies automatic monitoring station is a
roadside unit located at the Whirlies Roundabout, NGR NS 64385 55669. Monitoring for
NOx and PM10 commenced in 2008. PM2.5 and PM1 monitoring commenced March
2017. Distance to relevant exposure 10m. Distance to kerb of nearest road 0.5m. Inlet
height 2m.  
• Pollutants monitored for
Nitric oxide, Nitrogen oxides as nitrogen dioxide, Nitrogen dioxide, PM10, PM2.5, PM1 and
volatile PM10. 
• Types of equipment used 
NOx analyser model Thermo 42i, instrument serial number CM07460075
Palas Fidas instrument serial number 8257 
• Monitoring techniques used
127

Page 128

The Thermo 42i measures levels of nitrogen oxide (NO-NO2-NOx) in the emissions from
a source using chemiluminescent technology, generating three continuous signals: NO,
NO2 and NOx. All three measurements are independent and have available outputs on
the back of the analyser.
The Fidas uses a counting measuring method – optical light scattering according to
Lorenz-Mie from single particles – with the patented T-aperture to allow very precise
measurement even at high concentrations without coincidence error. 
Non-automatic 
• Site IDs, designation, address, NGR, dates of operation 
Site
ID
Designation Address NGR Dates of
Operation 
2 Kerbside Greenhills Road,
East Kilbride
NS 60052 53785 2018 to August
2023
(relocated tube
to Site ID 42)
7 Kerbside 218 Eaglesham Road,
East Kilbride
NS 60711 54205 2018 - ongoing
8 Kerbside Whirlies (3), East
Kilbride
NS 64385 55669 2015 - ongoing
9 Kerbside Whirlies (3), East
Kilbride
NS 64385 55669 2015 - ongoing
10 Kerbside Whirlies (3), East
Kilbride
NS 64385 55669 2015 - ongoing
11 Roadside 56 Maxwell Drive, East
Kilbride
NS 64210 54909 2018 to August
2023
(relocated tube
to Site ID 41)
41 Urban
background
Cathkin House
Nursing Home -
Kingsgate Retail Park,
East Kilbride
NS 64374 56862 August 2023 -
ongoing
42 Roadside Greenhills Road at
Lyndsayfield Nursing
Home
NS 62030 52031 August 2023 -
ongoing
46 Urban
background
Argosy Drive, East
Kilbride
NS 63993 55867 August 2023 -
ongoing 
• Pollutants monitored for
Nitrogen dioxide 
• Location in AQMA
8,9 and 10 are all co-located at the continuous air monitoring station located at the
Whirlies Roundabout. All other diffusion tubes are located in the East Kilbride wider
area. 
128

Page 129

• Distance to relevant exposure and to kerb of nearest road 
Site Id Distance to relevant
exposure (m)
Distance to kerb of
nearest road (m)
2 20 1.3
7 4.7 1.2
8 6.8 1.9
9 6.8 1.9
10 6.8 1.9
11 16 30
41 7.0 1.7
42  45 2.0
46 6.3 4.5 
Local Monitoring data
• Air Quality Standards and Objectives
PM10 annual mean = 18µgm-3 (Whirlies declared due to this objective) 
PM10 24 hour mean = 50 µgm-3 not to be exceeded more than seven times a year
PM2.5 annual mean = 10 µgm-3
NO2 annual mean = 40 µgm-3
NO2 1-hour mean = 200 µgm-3not to be exceeded more than 18 times a year 
• Results and data interpretation from automatic sites 
Annual Mean PM10 Monitoring Results (µg/m3) uncorrected (Objective = 18µgm-3)
Site ID 2020 2021 2022 2023
EK0 11.0 9.9 10.8 11.1 
Annual Mean PM10 Monitoring Results (µg/m3) corrected (Objective = 18µgm-3)
Site ID 2020 2021 2022 2023
EK0 9.0 9.8 10.1 9.0 
Annual Mean PM2.5 Monitoring Results (µg/m3) uncorrected (Objective = 10 µgm-3)
Site ID 2020 2021 2022 2023
EK0 5.0 4.7 5.1 4.0 
Annual Mean PM2.5 Monitoring Results (µg/m3) corrected (Objective = 10 µgm-3)
Site ID 2020 2021 2022 2023
EK0 5.3 5.0 5.4 4.2 
24-Hour-Mean PM10 Monitoring Results (µg/m3), Number of PM10 24 Hour Means > 50
µg/m3 (Objective = 50 µgm-3 not to be exceeded more than seven times a year)
Site ID 2020 2021 2022 2023
EK0 0 0 0 0 
Annual Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3) (Objective = 40
µgm-3)
Site ID 2020 2021 2022 2023
EK0 22 24.8 22 21
129

Page 130

1-hour Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3), Number of 1-Hour
Means > 200 µg/m3 (Objective = 200 µgm-3not to be exceeded more than 18 times a
year)
Site ID 2020 2021 2022 2023
EK0 2 4 0 0 
• Results and data interpretation from non-automatic sites 
Annual Mean NO2 Monitoring Results: Non-Automatic Monitoring (µg/m3)
Site ID 2020 2021 2022 2023
2 9.9 12.0 11.9 15.7
7 15.0 17.0 14.4 13.6
8 22.8 25.1 20.6 20.2
9 22.8 25.1 20.6 20.2
10 22.8 25.1 20.6 20.2
11 10.2 15.1 11.4 11.1
41 N/A N/A N/A 13.7
42 N/A N/A N/A 13.1
46 N/A N/A N/A 12.1 
• Results summary
For the previous three years the 18 µg/m3 Scottish PM10 annual mean objective has not
been exceeded at the Whirlies East Kilbride continuous air quality monitoring station. No
PM10 daily means greater than 50 µg/m3 were measured; compliant with the 24-hour
short-term mean objective. 
All annual mean NO2 concentrations measured at automatic and non-automatic
monitoring sites within the East Kilbride area were below the annual mean objective of 40
µg/m3 and have been for in excess of three years. No sites measured 1-hour mean NO2
concentrations in excess of 200 µg/m3 objective more than 18 times  between 2020 and
2023; all measurement sites were therefore compliant with the 1-hour short-term mean
objective.
All monitoring results were significantly below the air quality objectives giving confidence
that future exceedance is unlikely. 
Future actions to be retained for the AQMA 
• Measures to be continued to ensure future air quality objective compliance is
achieved 
South Lanarkshire’s updated air quality action plan is available here: Air quality
action plan 2024-2029 Environment - South Lanarkshire Council. Strategic and
Whirlies focused action measures are summarised below. All measures are currently
ongoing and will be integral to actions and strategies going forward. 
• Continue to strengthen links with all future Local Transport Strategies
• Continue to strengthen links with local planning development
• Continue to integrate air quality where appropriate with other SLC plans, policies or
strategies.
• Develop and adopt an Air Quality Strategy for SLC
• Continue to review and update SLC AQ guidance and information
• Work in partnership with SG on air quality matters
• Work in partnership with SLC traffic and transportation partners on active and
sustainable co-benefits projects
130

Page 131

• Continue to invest in traffic signal optimisation to improve traffic flow and decrease
traffic emissions
• Continue to support the uptake of low emission vehicles
• Continue to support measures to ensure adequate maintenance of current counters
and to support measures to increase the traffic counter network over all transport
modes.
• Continue to support ongoing AQ education resources for relevant SLC departments
• Continue to support rail and bus station improvements
• Continue to support AQ educational resources with all our education sector partners
within SL
• Continue to support expansion of active travel options.
• Continue to support active and sustainable travel behaviour change.
• Continue to monitor and review air quality within South Lanarkshire.
• Support development control measures that have a positive impact on AQ.
• Continue to undertake vehicle emission testing and / or awareness raising subject to
funding.
• Continue to undertake anti- engine Idling activities subject to funding.
• Continue to support real time passenger information via a variety of means over all
forms of public transport.
• Support cycle or other active travel equipment hire / cycle library schemes.
• Development/updating of an air quality strategy
Work has commenced on the development of a South Lanarkshire Air Quality
Strategy. 
Conclusion 
The Whirlies AQMA was declared due to potential exceedance of the Scottish annual mean
objective for PM10. Monitoring data for the annual mean PM10 as well as the 24-hour short-
term mean PM10 objective, the NO2 annual mean objective and the 1-hour short-term mean
NO2 objective has been reviewed. No exceedances of any of the PM10 and NO2 air quality
objectives have been measured for in excess of three years. All monitoring results were
significantly below the air quality objectives giving confidence that future exceedance is
unlikely. On this basis South Lanarkshire are revoking the Whirlies AQMA. 
131

Page 132

Annex A
Map of Whirlies Air Quality Management Area  
132

Page 133

Appendix 2: Rutherglen Revocation Report 
Revocation of Rutherglen Air Quality Management Area Report Background 
• Introduction
An Air Quality Management Area (AQMA) in Rutherglen encompassing the whole town
area was declared in 2016 due to likely breaches of Particulate Matter (PM10) annual
mean air quality objective of 18µg/m3 
Rutherglen is situated at the north-western tip of South Lanarkshire, bordering the City
of Glasgow. Formerly within the Glasgow City boundary, the town is commonly
considered part of greater Glasgow and is a densely populated area of large scale
former industrial land use. The land use in Rutherglen predominantly comprises
residential properties and local retail with some remaining industry. 
A link to the South Lanarkshire Council Air Quality Management Area Order No.2
Rutherglen is available here: https://www.scottishairquality.scot/laqm/aqma/1610 
Measured PM10 concentrations have declined over recent years and, on this basis,
South Lanarkshire Council are working towards revoking the Rutherglen AQMA. This
report aims to provide evidence to support revocation. 
• Legislation
In exercise of the powers conferred upon it by Section 83(1) of the Environment Act
1995 South Lanarkshire declared South Lanarkshire Council Air Quality Management
Area No.2 Rutherglen which came into effect on 1st January 2016. 
• Summary of proposal
This report presents evidence to demonstrate that air quality objectives are not, and are
unlikely to be, exceeded and as such the Rutherglen AQMA should be revoked.   
Description of AQMA
• Pollutants declared for and time intervals, date declared
The Rutherglen AQMA was declared due to potential exceedance of the Scottish annual
mean objective for PM10. The AQMA was declared January 2016. 
• Description and extent of AQMA
The AQMA encompasses the whole town of Rutherglen. The AQMA is demonstrated in
map format in Annex A. 
Description of local sources
• Local sources (e.g. traffic, industry) 
The principal source of NO2 and PM10 emissions in Rutherglen was found to be road
traffic on the main roads which pass through the town. Permitted industrial operators in
the Rutherglen area mainly involve cement, concrete and roadside coating processes
and fugitive emissions of PM10 which may be emitted from these processes were
assessed during previous rounds of the LAQM review and assessment cycle. It was not
133

Page 134

considered likely that the PM10 annual mean would be exceeded at locations of relevant
exposure close to any known fugitive dust sources in Rutherglen. Combustion
associated with heating systems for commercial and domestic properties were also
considered as contributors to NO2 and PM10 emissions however these were not
considered significant and unlikely to cause any exceedance of the air quality
objectives. 
Dispersion modelling studies of road traffic emissions in Rutherglen were undertaken to
allow detailed assessment of both NO2 and PM10 concentrations. Two assessments
undertaken in the Rutherglen area considered the impact of traffic on air quality pre and
post M74 extension. It was noted that changes to traffic flow attributable to the opening
of the motorway had displaced traffic that previously used Rutherglen as a route into
Glasgow from the southeast. This meant a significant reduction of approximately 5,000
vehicles per day through Main Street, Rutherglen. This had a significant impact on the
magnitude and spatial extent of the overall area modelled as exceeding the air quality
objective for particulate matter. 
Rutherglen was designated due to a likely breach of the annual mean PM10 air quality
objective. Air quality levels in Rutherglen exceed this objective where there is relevant
exposure 60 metres east of the Farmeloan Road / Main Street junction. A further
hotspot has also been noted approximately 70 metres north of the Farmeloan Road /
Main Street junction. Street canyon conditions were observed in both these locations. 
Traffic volume, slow speed at junctions and street canyon effects were considered the
main contributors to exceeding air quality objectives for particulate matter in the
Rutherglen area. 
The air quality management area was not restricted to the areas of exceedances and
instead encompassed the area recognised as the town of Rutherglen. This was to allow
a more holistic approach to action planning. This approach also aimed to ensure that
future action and development within the Rutherglen area took into consideration the
potential impact on air quality across the wider Rutherglen area. 
• Action planning measures which have been implemented
Active travel 
‘Love to Ride South Lanarkshire’ was a tailored online behaviour change programme
and platform which ran for eighteen months and has been proven to motivate and
encourage more people on bikes. The project engaged with 35 workplaces and
encouraged 18% of new riders to become occasional or regular riders and 9% of active
occasional riders to become regular riders. More information is available here: Set
cycling pledge ahead of Ride Anywhere Week - South Lanarkshire View 
‘Beat the Street’ projects have been delivered in South Lanarkshire since 2018. This is a
sustainable active travel behaviour change initiative aimed at encouraging residents and
visitors to decrease journeys by car and increase journeys made using more active and
sustainable means of travel. Projects have taken place in Lanark and Rutherglen, East
Kilbride (EK)(x 3), Hamilton and Blantyre, Cambuslang and Rutherglen and within the
Clydesdale area. Over 66,000 people have taken part and community engagement has
ranged between 10 – 17% of the local population. Participants have walked, cycled, or
wheeled over 820,000 miles. Some further information is available here:
https://www.southlanarkshireview.scot/news/article/2411/winners_of_east_kilbride_s_lat
est_beat_the_street_challenge 
‘BetterPoints – Think, Move, Breathe’ is an App based active and sustainable travel
behaviour project that rewards participants for choosing active and sustainable ways of
134

Page 135

travelling across South Lanarkshire. More information is available here: BetterPoints -
Think, Move, Breathe. 
South Lanarkshire re-launched its ‘Cycle2Work’ scheme and in 2022 agreed that this
scheme would now be an all-year-round project with no closing date for applications.
More information is available here: Cycle2Work 
Cycle training has also been provided within our schools. In academic year 2022-23
there were 67 schools delivering to Bikeability Level 1 and 52 schools training to Level 2
on-road with a further 2 schools delivering Level 2 style training in the playground. 
Ongoing improvements and expansion of the cycling and walking network continued
and a link to the current network is available via online resource linked here: The air that
we breathe story map. 
SLC Walking and Cycling Sustainable Travel Promotion. Each year SLC undertake a
publicity campaign with our “Leave the Car at Home” message, and this involves a
variety of publicity formats such as billboard advertising, bus rear advertising and
supermarket digital sheet advertising. 
Improvement in Bus Services – SLC in partnership with Strathclyde Partnership for
Transport (SPT) have been improving facilities at bus stops including providing high
quality bus shelters, making bus stops more accessible, with installation of high kerbs
that are at the same height as the floor of the buses and providing timetable information
at all bus stops. Also installed are real time passenger information along some of the
strategic bus routes, making travelling by bus more convenient and desirable. 
Education
Focused air quality workshops have been delivered to both primary and secondary
school students. 
Conference of Schools (COS1) event – On the back of the Conference of the Parties 26
(COP26) summit event in Glasgow in 2021 young people from all high schools within
South Lanarkshire created a Youth Forum on Climate Change and Sustainability. They
held their first mini-COP event called Conference of Schools 1 (COS1) in 2022 which
was held over three days at Palace Grounds in Hamilton with more than 500 primary
aged children in attendance. The Youth Forum came up with a theme for the event
“TIERS” which focused on Travelling, Influencing, Eating, Reduce-Reuse-Recycle, and
Shopping. They asked the school attendees to commit to a set of pledges and to raise
awareness across the rest of the schools. A further COS2 event also ran in February
2024 and more information is available:
https://blogs.glowscotland.org.uk/sl/public/primaryscience/uploads/sites/13996/2024/05/
28124907/COS2-Case-Study-final.pdf   
Tackling engine idling 
South Lanarkshire’s no engine idling promotion campaign included banners which are
displayed on a locational rota basis on streetlamps and railings. The campaign
emphasises the effects of poor air quality from engine idling. The refreshed campaign
branding ’30 good reasons to switch off your engine’ and ’11 good reasons to turn off
your engine’ are in use around schools and sports centres. The new branding has been
very well received. An example of the campaign is available here:
https://www.southlanarkshireview.scot/news/article/1304/pupils_switch_on_to_social_to
_ask_you_to_switch_off_your_engine.    
135

Page 136

Improvements to vehicle emissions
South Lanarkshire increased the numbers of fuel efficient and electric vehicles within the
council fleet, including pool cars, sweepers, and a minibus, and expanded the public
electric vehicle charging network with 133 charging points now available. Read more
here: Tariff to be introduced for electric vehicle charging – South Lanarkshire View 
An ECO Stars fleet scheme has been running since 2014 and aims to raise awareness
among companies of the important role they can play in helping improve local air quality
by enhancing the performance of their fleet. To date there are 289 members with 10,618
vehicles registered to the scheme. SLC is a member of the scheme. More information is
available here:
https://www.southlanarkshire.gov.uk/info/200193/pollution/263/air_quality/11 
An Eco Stars Taxi scheme commenced in 2021 and has 13 taxi operators with a total of
174 vehicles registered within the scheme. Three Taxi Operators workshops have also
been run as a joint initiative with North Lanarkshire Council. These workshops gave taxi
operators information and advice on the Energy Savings Trust Switched on Taxi loan.
Information on the Low Emission Zone (LEZ) scrappage scheme which is open to
households within 20km of an LEZ was also provided (several towns within South
Lanarkshire fall within this radius). The scrappage scheme provides grants to
households to dispose of non-compliant vehicles. Information was also given on
Glasgow’s LEZ and how it might impact drivers from both North and South Lanarkshire,
as well as showcasing some ultra-low emissions taxis from the Glasgow Taxi Centre. 
In 2020 an Eco Stars Bus Operators workshop was held. This was also a joint initiative
with North Lanarkshire Council to make bus operators aware of the funding incentives
from BEAR (Transport Scotland’s Bus Emissions Abatement Retrofit programme). This
programme aims to fit buses/coaches with Clean Vehicle Retrofit Accreditation Scheme
(CVRAS) accredited retrofit technology measures to support the delivery of Scotland’s
LEZs and neighbouring authorities benefit also by reducing nitrogen dioxide (NO2) and
particulate matter (PM10 and PM2.5) emissions in air. Three Bus Operators were
successfully signed up to this programme following this workshop. 
Traffic signal optimisation has been introduced at key locations where possible within
areas that impact the flow of traffic to and within the AQMAs. The Split Cycle Offset
Optimisation Technique (SCOOT) traffic light system enables groups of traffic signals in
busy areas to work together so that traffic flow is smoother, congestion reduced, and
emissions minimised. 
Funded Vehicle Emissions Testing events have been held during summer months at
locations that include existing, former, and potential AQMAs. Vehicles were randomly
selected from the traffic and with Police assistance diverted to a safe site, and those
vehicles are tested. These events were delivered in partnership with North Lanarkshire
Council and Police Scotland. These events were exclusively funded by Scottish
Government (SG) grant award and delivered by SLC certified Environmental Health
Staff. 
• Funding
Many of the actions as listed above have been supported through funding awarded via
Scottish Government’s Air Quality Action Plan, Local Air Quality Management as well as
Vehicle Emission Testing and Engine Idling grant funds. Scottish Government’s
previous three air quality funding grant streams have been amalgamated for year 24/25
into Local Air Quality Management as well as Air Quality Resource grant streams.  
Funding support has also been provided by Smarter Choices Smarter Places although
136

Page 137

this fund had been discontinued in 24/25. SPT’s Active Travel, People and Places
Funding opened in 24/25 and has supported delivery of some of the projects listed.
South Lanarkshire Council’s Climate Emergency Fund has also been utilised to support
project delivery. 
• Changes to local sources from measures which have been implemented or changes to
local circumstances for emission sources
No singular identifiable change to local sources attributed specifically to action plan
measures has been identified. The full diverse array of measures was aimed at having a
cumulative impact on overall emission levels. 
Local Monitoring equipment
Automatic 
• Site IDs, designation, address, NGR, dates of operation
Site ID South Lanarkshire Rutherglen automatic monitoring station is a roadside unit
located in Rutherglen at the crossroads between the A730 and B768, NGR NS 61145
61694. Monitoring for NOx and PM10 commenced in 2012. PM2.5 and PM1 monitoring
commenced February 2017. Distance to relevant exposure is 60 metres and the nearest
road is 1m. Inlet height 2m.  
• Pollutants monitored for
Nitric oxide, Nitrogen oxides as Nitrogen dioxide, Nitrogen dioxide, PM10, PM2.5, PM1
and volatile PM10. 
• Types of equipment used 
NOx analyser model Thermo 42i, instrument serial number CM10220001
Palas Fidas instrument serial number 8140. 
• Monitoring techniques used
The Thermo 42i measures levels of nitrogen oxide (NO-NO2-NOx) in the emissions from
a source using chemiluminescent technology, generating three continuous signals: NO,
NO2 and NOx. All three measurements are independent and have available outputs on
the back of the analyser.
The Fidas uses a counting measuring method – optical light scattering according to
Lorenz-Mie from single particles – with the patented T-aperture to allow very precise
measurement even at high concentrations without coincidence error. 
Non-automatic 
• Site IDs, designation, address, NGR, dates of operation 
Site ID Designation Address NGR Dates of
Operation 
23(2011)
27(2012)
27(2013)
27(2014)
Roadside Cambuslang
Road, Rutherglen
NS 63505
61822
2011 - 2015
24(2011)
28(2012)
28(2013)
28(2014)
12(2015)
12(2016)
Roadside Farmeloan Road,
Rutherglen
NS 61662
61789
2011 -
ongoing
137

Page 138

12(2017)
12(2018)
12(2019)
12(2020)
12(2021)
12(2022)
12(2023)
25(2011)
29(2012)
29(2013)
29(2014)
Roadside Stonelaw Road,
Rutherglen
NS 61693
61178
2011 - 2015
30(2012)
30(2013)
30(2014)
Roadside 263 Main Street,
Rutherglen
NS 61682
61681
2012 - 2015
31(2012)
31(2013)
31(2014)
14(2015)
14(2016)
14(2017)
14(2018)
14(2019)
14(2020)
14(2021)
14(2022)
14(2023)
Roadside Mill Street,
Rutherglen
NS 61312
60699
2012 -
ongoing
32(2013)
32(2014)
Roadside Main Street,
Rutherglen (Co-
location 1)
NS 61114
61691
2013 - 2015
33(2013)
33(2014)
Roadside Main Street,
Rutherglen (Co-
location 2)
NS 61114
61691
2013 - 2015
34(2013)
34(2014)
Roadside Main Street,
Rutherglen (Co-
location 3)
NS 61114
61691
2013 - 2015
18(2016)
18(2017)
Kerbside 281 Stonelaw
Road, Rutherglen
NS 62162
60431
2016 - 2017
13(2015)
13(2016)
13(2017)
13(2018)
13(2019)
13(2020)
13(2021)
13(2022)
13(2023)
Roadside 254 Main Street,
Rutherglen
NS 61653
61663
2015 -
ongoing
15(2015)
15(2016)
15(2017)
Roadside 25 Burnside Road,
Rutherglen
NS 62484
59416
2015 -2018
16(2015)
16(2016)
16(2017)
Roadside 1 Rodger Drive,
Rutherglen
NS 61789
60949
2015 -2018 
• Pollutants monitored for
Nitrogen dioxide
138

Page 139

• Location in AQMA
32,33 and 34 were co-located at the continuous air monitoring station located in
Rutherglen however these tubes were discontinued following continual theft and
vandalism of the tubes in this location. All other diffusion tubes are located in the
Rutherglen wider area. 
• Distance to relevant exposure and to kerb of nearest road 
Site Id Distance to relevant
exposure (m)
Distance to kerb of
nearest road (m)
23(2011)
27(2012)
27(2013)
27(2014)
n/a 2
24(2011)
28(2012)
28(2013)
28(2014)
12(2015)
12(2016)
12(2017)
12(2018)
12(2019)
12(2020)
12(2021)
12(2022)
12(2023)
25 2
25(2011)
29(2012)
29(2013)
29(2014)
21 2
30(2012)
30(2013)
30(2014)
0 2
31(2012)
31(2013)
31(2014)
14(2015)
14(2016)
14(2017)
14(2018)
14(2019)
14(2020)
14(2021)
14(2022)
14(2023)
4 2.5
32(2013)
32(2014)
10 2
33(2013)
33(2014)
10 2
34(2013)
34(2014)
10 2
18(2016) 1.6 1.4
139

Page 140

18(2017)
13(2015)
13(2016)
13(2017)
13(2018)
13(2019)
13(2020)
13(2021)
13(2022)
13(2023)
3.8 0.1
15(2015)
15(2016)
15(2017)
9 0.3
16(2015)
16(2016)
16(2017)
18.5 0.7 
Local Monitoring data
• Air Quality Standards and Objectives
PM10 annual mean = 18µgm-3 (Rutherglen declared due to this objective) 
PM10 24-hour mean = 50 µgm-3 not to be exceeded more than seven times a year
PM2.5 annual mean = 10 µgm-3
NO2 annual mean = 40 µgm-3
NO2 1-hour mean = 200 µgm-3not to be exceeded more than 18 times a year 
• Results and data interpretation from automatic sites 
Annual Mean PM10 Monitoring Results (µg/m3) uncorrected (Objective = 18µgm-3)
Site ID 2019 2020 2021 2022 2023
SL04 14 15.4 11.0 13.1 13.0 
Annual Mean PM10 Monitoring Results (µg/m3) corrected (Objective = 18µgm-3)
Site ID 2019 2020 2021 2022 2023
SL04 14 10.0 11.9 11.8 11.0 
Annual Mean PM2.5 Monitoring Results (µg/m3) uncorrected (Objective = 10 µgm-3)
Site ID 2019 2020 2021 2022 2023
SL04 8 6.0 5.9 6.2 6.0 
Annual Mean PM2.5 Monitoring Results (µg/m3) corrected (Objective = 10 µgm-3)
Site ID 2019 2020 2021 2022 2023
SL04 8 6.4 6.3 6.6 6.4 
24-Hour-Mean PM10 Monitoring Results (µg/m3), Number of PM10 24 Hour Means > 50
µg/m3 (Objective = 50 µgm-3 not to be exceeded more than seven times a year)
Site ID 2019 2020 2021 2022 2023
SL04 4 0 0 0 0 
Annual Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3) (Objective = 40
µgm-3)
Site ID 2019 2020 2021 2022 2023
SL04 36 - 25.5 22.5 22
140

Page 141

1-hour Mean NO2 Monitoring Results: Automatic Monitoring (µg/m3), Number of 1-Hour
Means > 200 µg/m3 (Objective = 200 µgm-3not to be exceeded more than 18 times a
year)
Site ID 2019 2020 2021 2022 2023
SL04 0 - 0 0 0 
• Results and data interpretation from non-automatic sites 
Annual Mean NO2 Monitoring Results: Non-Automatic Monitoring (µg/m3) (Objective =
40 µgm-3)
Site ID 2019 2020 2021 2022 2023
12 34.9 27.7 27.9 25.1 25.1
13 23.9 17.3 20.1 17.0 17.2
14 29.4 19.3 22.6 18.9 19.8 
• Results summary
For the previous three years the 18 µg/m3 Scottish PM10 annual mean objective has not
been exceeded at the Rutherglen continuous air quality monitoring station. No PM10 daily
means greater than 50 µg/m3 were measured; compliant with the 24-hour short-term
mean objective. 
All annual mean NO2 concentrations measured at automatic and non-automatic
monitoring sites within the Rutherglen area were below the annual mean objective of 40
µg/m3 and have been for in excess of three years. No sites measured 1-hour mean NO2
concentrations in excess of 200 µg/m3 objective more than 18 times  between 2019 and
2023; all measurement sites were therefore compliant with the 1-hour short-term mean
objective.
All monitoring results were significantly below the air quality objectives giving confidence
that future exceedance is unlikely. 
Future actions to be retained for the AQMA
• Measures to be continued to ensure future air quality objective compliance is
achieved 
South Lanarkshire’s updated air quality action plan is available here: Air quality
action plan 2024-2029 Environment - South Lanarkshire Council. Strategic and
Rutherglen focused action measures are summarised below. All measures are
currently ongoing and will be integral to actions and strategies going forward. 
• Continue to strengthen links with all future Local Transport Strategies
• Continue to strengthen links with local planning development
• Continue to integrate air quality where appropriate with other SLC plans, policies or
strategies.
• Develop and adopt an Air Quality Strategy for SLC
• Continue to review and update SLC AQ guidance and information
• Work in partnership with SG on air quality matters
• Work in partnership with SLC traffic and transportation partners on active and
sustainable co-benefits projects
• Continue to invest in traffic signal optimisation to improve traffic flow and decrease
traffic emissions
• Continue to support the uptake of low emission vehicles
• Continue to support measures to ensure adequate maintenance of current counters
and to support measures to increase the traffic counter network over all transport
modes.
141

Page 142

• Continue to support ongoing AQ education resources for relevant SLC departments
• Continue to support rail and bus station improvements
• Continue to support AQ educational resources with all our education sector partners
within SL
• Continue to support expansion of active travel options.
• Continue to support active and sustainable travel behaviour change.
• Continue to monitor and review air quality within South Lanarkshire.
• Support development control measures that have a positive impact on AQ.
• Continue to undertake vehicle emission testing and / or awareness raising subject to
funding.
• Continue to undertake anti- engine Idling activities subject to funding.
• Continue to support real time passenger information via a variety of means over all
forms of public transport.
• Support cycle or other active travel equipment hire / cycle library schemes.
• Development/updating of an air quality strategy
Work has commenced on the development of a South Lanarkshire Air Quality
Strategy. 
Conclusion 
The Rutherglen AQMA was declared due to potential exceedance of the Scottish annual
mean objective for PM10. Monitoring data for the annual mean PM10 as well as the 24-hour
short-term mean PM10 objective, the NO2 annual mean objective and the 1-hour short-term
mean NO2 objective has been reviewed. No exceedances of any of the PM10 and NO2 air
quality objectives have been measured for in excess of three years. All monitoring results
were significantly below the air quality objectives giving confidence that future exceedance is
unlikely. On this basis South Lanarkshire are revoking the Rutherglen AQMA. 
142

Page 143

Annex A
Revocation of the Rutherglen and Whirlies (East Kilbride) Air Quality Management
Areas 
143

Page 144

144

Page 145

Report
Agenda Item 
Report to: Community and Enterprise Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Approval of South Lanarkshire Council’s Food Service
Plan for 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval for the Food Service Plan 2025/2026 developed for South
Lanarkshire Council in accordance with, and as required by, The Food Law Code
of Practice (Scotland) 2019, and the draft Administration and Service Planning –
Food Law Code of Practice (Scotland) 2020
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Food Service Plan 2025/2026, attached as Appendix 1 of this report, be
approved.
[1recs]
3. Background
3.1. Local Authorities have a statutory duty to enforce legislation relating to food. This is
achieved by carrying out ‘official controls’ in food establishments within their area.   
3.2. Official controls comprise of, inspections, audits, monitoring, surveillance, or sampling. 
The legislation is supported by Codes of Practice issued under Section 40 of the Food
Safety Act 1990, Regulation 24 of the Food Hygiene (Scotland) Regulations 2006 and
Regulation 6 of the Official Feed and Food Controls (Scotland) Regulations 2009. 
Food Authorities are required to have regard to these Codes when discharging their
duties. 
3.3. Statutory obligations in the Food Safety Act 1990 and associated legislation apply to
the delivery of official controls by Local Authorities to ensure:- 
 the effectiveness and appropriateness of official controls
 controls are applied at an appropriate risk-based frequency
 a sufficient number of suitably qualified and experienced competent staff and
adequate facilities and equipment to carry out our duties properly are provided
 staff are free from conflicts of interest
 there is access to an adequate laboratory capacity and capability for testing 
14
145

Page 146

3.4. The Food Law Code of Practice (Scotland) 2019 instructs Food Authorities to ensure
these statutory obligations are brought to the attention of their local authority officials
and or elected member bodies responsible for agreeing budgets or other service
arrangements relevant to the delivery of official controls. 
3.5. The Food Law Code of Practice (Scotland) 2019 further instructs each Food Authority
to complete an annual Service Plan which details the interventions programme for the
coming year.  They should ensure the programme is adequately resourced, and the
overall plan is subject to approval at the appropriate governance level within the local
authority. 
4. The Food Service Plan 2025/2026
4.1.  A copy of The Food Service Plan for 2025/2026 is included in Appendix 1. 
4.2. The Food Law Code of Practice (Scotland) 2019, and the draft Administration and
Service Planning – Food Law Code of Practice (Scotland) 2020 stipulate Food Service
Plans should be drawn up, documented and implemented in accordance with the
Codes of Practice, and include a template to ensure that all official controls covered
by the Codes are included in the plan, whilst allowing scope for locally defined
objectives. 
4.3. The Food Service Plan includes a statement in relation to the Food Authority’s
approach or policy on interventions, enforcement and service delivery. The Plan also
include a profile of food businesses, the number of interventions programmed, and
estimate of the number of revisits to be made and an estimation of the resources
required. 
4.4. The Food Service Plan 2025/2026 has been developed in accordance with the
requirements of The Food Law Code of Practice (Scotland) 2019, and the draft
Administration and Service Planning – Food Law Code of Practice (Scotland) 2020. 
4.5. The Food Service Plan 2025/2026 was completed in June 2025 and reflects the
staffing resources available at that time. The Food Service Plan will be reported on an
annual basis to the Community and Enterprise Resources Committee. 
5. Employee Implications
5.1. There is no employee implications associated with this report. 
6. Financial Implications
6.1. There are no financial implications associated with this report. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability and environmental implications
associated with this report. 
8. Other Implications
8.1. Sections 3 and 6 of the Food Service Plan outline the impact of changes introduced
to the food business inspection programmes by Food Standards Scotland. Highlighting
that these changes create an unachievable interventions target. 
8.2. Interventions are, therefore, prioritised to ensure resources are directed at the highest
risk areas in order to safeguard consumers and in the interests of public health.    
146

Page 147

9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
or consultation is required. 
David Booth
Executive Director ( Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 We will work to recover, progress and improve
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee Report 7 November 2023
 Community and Enterprise Resources Committee Report 17 September 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Craig Brown, Environmental Services Manager
Ext:  07795453408
E-mail:  Craig.Brown2@southlanarkshire.gov.uk 
147

Page 148

148

Page 149

Appendix 1   
South Lanarkshire Council
Food Service Plan 2025/2026 
14
149

Page 150

1. Service Aims and Objectives
1.1 Interventions at Food Business Establishments
The role of Environmental Services is to protect the public health of residents and visitors to
South Lanarkshire.  Public health can be defined as “the science and art of preventing
disease”, prolonging life and improving the quality of life through organised efforts and
informed choices of society, organisations, communities and individuals.
In this respect the overall aim of our Food and Business Regulation Team is to ensure the
safety, quality and authenticity of food produced and sold by food businesses based in
South Lanarkshire.  
As a Statutory Food Authority under the Food Safety Act 1990 and Assimilated Regulation
(EU) 2017/625 the steps we will take to achieve our aim include: 
• implementing a planned programme of food law inspections of food businesses;
• responding to complaints; 
• investigating incidences of food borne illness; 
• sampling foods to ensure they are fit for human consumption and meet all quality,
compositional, and authenticity requirements; and 
• providing advice and guidance to food businesses.  
1.2 Links to corporate objectives and plans
The aims and objectives of this Service Plan align with South Lanarkshire Council’s overall
Connect Plan 2022-2027 where the Council’s ‘Vision’ is to ‘Improve the lives and prospects
of everyone in South Lanarkshire’.  One of the Council’s stated priorities is to ‘put people
first’, with the outcome we are seeking to deliver in terms of ‘health and wellbeing’ being to
ensure that ‘people live the healthiest lives possible’.
Environmental Services will monitor our performance against the overall Council Plan, as
well as at Resource/Service level.  The measure currently reported by the Food and Business
Regulation Team is the % of businesses inspected within South Lanarkshire Council who are
broadly compliant with Food Law requirements.  The target set for this measure is currently
85% of all businesses inspected. 
2. Background
2.1 Profile of the Local Authority
South Lanarkshire has a population of around 316,000 and is one of the largest and most
diverse areas in Scotland.  The Council covers around 180,000 hectares of land stretching
from the outskirts of Glasgow to near the Scottish Borders.  The Local Authority area
consists of a mix of urban and rural environments, with almost 80% of the area classed as
agricultural whilst 70% of the population live in the major urban settlements in the north.
150

Page 151

There are four towns in South Lanarkshire with a population of over 20,000 (East Kilbride,
Hamilton, Rutherglen and Cambuslang) and a further 23 towns and settlements with a
population of more than 1000.
2.2 Organisational Structure 
Chief Executive South
Lanarkshire Council 
South Lanarkshire Council Director of Community &
Enterprise Resources
Head of Planning & Regulatory
Services
Service Delivery Plan approver
Divisional Environmental Services
Officer x 1 
Lead Officer Hygiene & Standards
Environmental Services Manager
Most Senior EHO, manages all
facets of Environmental Health and
Trading Standards
Food Budget Holder
Enforcement Staff with
responsibility for Food Law
EHO’s FTE 9.85
Food Safety Officers FTE 3.6
Students x 2 
Environmental Health Team
Leaders x 1.8 
151

Page 152

Our Laboratory Services are contracted out to Edinburgh Scientific Services, who also
provide our appointed Public Analysts and Food Examiners.
2.3 Scope of the Food Service
The Food Service within South Lanarkshire Council is provided by the Food and Business
Regulation team, led by the Council’s appointed Lead Food Officer (Divisional Environmental
Health Officer) and assisted by one full time and one part time Team Leaders.  The team is
one of 4 teams that operate under the direction of the Environmental Services Manager and
consists of 7 full time Environmental Health Officers, 4 part time Environmental Health
Officers, 3 full time Food safety Officers (designated Technical Officers) and 1 part time Food
Safety Officer.  The broad areas of responsibility for the team include:
• Food Safety and Food Standards Enforcement; 
• Occupational Health and Safety Enforcement; 
• Infectious disease investigation; and 
• Caravan Site Licensing.
A more detailed list of responsibilities include:
• Carrying out Food Law interventions in food businesses that fall within the remit of
the Food Law Rating Scheme;
• Carrying out food hygiene/food standards interventions in food primary production
establishments, for example dairy farms and fruit/vegetable producers; 
• Approving and carrying out official control interventions in Approved food
establishments;
• Carrying our food standards interventions in Food Standards Scotland Approved food
establishments;
• Investigating complaints regarding the hygiene of food establishments, for example
complaints regarding cleanliness or the way in which food is being handled; 
• Investigating food complaints including those relating to allergen/point of sale and
labelling information, chemical/compositional standards and microbiological and
foreign body contamination, for example wrong allergy information provided,
mouldy food, or hair in food;
• Investigating incidents of potential food fraud/crime;
• Responding to food incidents/withdrawals/recalls;
• Providing advice to food businesses in relation to food hygiene and standards;
• Issuing export health certificates and attestations;
• Providing Section 50 certificates to food businesses who wish to be granted a licence
to sell alcohol;
• Providing certificates of compliance to street traders who require a licence to trade;
• Sampling foods to ensure they are fit for human consumption and meet all quality,
compositional, and authenticity requirements and investigating sample failures, such
as the presence of food poisoning organisms in food, or excessive levels of additives
including colours in foods; 
152

Page 153

• Investigating incidences of foodborne illness, for example E. coli or Salmonella;
• Issuing venison dealers licences;
• Responding to complaints regarding commercial waste/odours;
• Responding to building control and general licensing consultations, for example
occasional licences for the sale of alcohol, or late hours catering licences;
• Responding to consultations and carrying out inspections to premises who require to
be licensed under the Civic Government (Scotland) Act 1982, eg, tattooists, skin
piercers and sunbed establishments.  In addition, South Lanarkshire Council now
licence swimming pools, soft play centres and trampoline parks.  We inspect and
consult on the licencing of these establishments, as well as on other public
entertainment events such as fireworks displays;
• Issuing caravan site licences for residential and holiday/tourer sites;
• Carrying out inspections of premises to ensure compliance with the Health and
Safety at Work, etc Act 1974;
• Investigation of workplace accidents, for example slips, trips and falls, or falls from
height;
• Investigating health and safety related complaints, such as lack of welfare facilities or
excessive workplace temperatures; and
• Providing advice to businesses on health and safety requirements.
2.4 Demands on Food Service
The profile of food businesses within South Lanarkshire, as found on our food premises
database at May 2025, consists of 3216 *registered and 27 *approved premises.  A further 4
businesses have submitted applications for approval which are pending.
*All food business operators require to register their establishment with the relevant Local
Authority before food operations commence under Assimilated Regulation (EC) 852/2004,
however a small number of businesses handling products of animal origin and supplying
these to other businesses require instead to apply and be granted approval from the Local
Authority before commencing operations under Assimilated Regulation (EC) 853/2004.  A
unique reference number will be allocated by the Local Authority to each establishment that
is granted approval.
The profile of food businesses in South Lanarkshire can be further broken down as follows:
Approved Premises:
Dairy Products Establishments:  7
Meat Products Establishments:  4
Fishery Products Establishments:  3 (1 premises also approved for meat products)
Live Bivalve Molluscs Establishments: 1 (also approved for fishery products)
Meat Preparations Establishments:  2
Stand Alone Cold Stores:   6
153

Page 154

Egg Packers:     4
Registered Premises:
South Lanarkshire Council is home to 61 non-approved manufacturers including both large
and small bakery/confectionery manufacturers; bottling plants and small distillers of
alcohol; sandwich manufacturers; soft drinks manufacturers; a producer of bottled water,
and in addition a natural mineral water producer.  In addition, we have producers of salt or
smoked salt-based products, a honey manufacturer, a biltong producer and a non-approved
dairy products premises.
The breakdown of non-manufacturing registered food businesses, excluding primary
producers and Food Standards Scotland Approved Premises is set out in the following table:
Premises Type Number of premises
Restaurant/Café/Snack bar/Canteen 489
Takeaway 341
Pubs Providing Food 58
Pubs not serving Food 98
School kitchens 151
Domestic premises/food business 361
Childminders 113
Childcare Premises 135
Homes/Institutional Kitchens 108
Mobile vehicles – catering 108
Other Caterers 314
Butcher 38
Baker 40
Fishmonger 8
Supermarket 86
Newsagent/General Store 184
Mobile Vehicles – retail 33
Chemists/Pharmacies 74
Off Licences 22
Other Retailers 244
Distribution/warehousing 43
Primary Producers/Dairy Farms
South Lanarkshire Council has 81 dairy farms, one of which produces milk for the production
of unpasteurised dairy products.  We also have 9 additional registered primary producers,
two game dealers, three businesses slaughtering poultry on farm, one deer larder, one
fruit/vegetable packer and two non-approved egg producers/packers.
Food Standards Scotland (FSS) Approved Premises
South Lanarkshire Council register and inspect 7 premises for food standards, with the
hygiene interventions in such premises being undertaken by FSS. 
154

Page 155

Export Health Certificates/Attestations
South Lanarkshire Council provide Export Health certificates and premises endorsements to
food businesses who require these in order to export the food products they manufacture
to third countries.  During 24/25 we issued export health certificates/premises
endorsements to 5 businesses within South Lanarkshire.  2 were exporting bakery
products/confectionary; one a low salt product; one was exporting food coatings; and the
final one was for the export of seasoning mixes.  70 certificates in total were issued in
24/25, the vast majority of these being issued in respect of bakery products/confectionery.
South Lanarkshire Council is the location of one of three Approved Stand-Alone Cold Stores
in Scotland that operate as export hubs to allow food businesses to export fishery products
to the EU.  Food businesses wishing to export their products via this and other hubs require
attestations from their local Environmental Health Officer in order to facilitate signing of the
certificates at the hubs by veterinarians.  South Lanarkshire have one fishery products
manufacturer who require these attestations every 6 months to allow them to export their
products to the EU via the hubs.  The food and business regulation team provide these
certificates to this food businesses twice a year as and when required.
Environmental Services operate from a single location, based in Hamilton.  Our offices are
open to the public from 8.45am until 4.45pm Monday to Thursday and 8.45am until 4.15pm
on a Friday.  Staff within Environmental Services Food and Business Regulation Team work
within flexitime bands, with the normal bandwidth for flexible working being between 8am
and 7pm.  Out with these hours of work additional flexitime, toil or overtime is available to
officers when agreed by their line manager, and in the case of paid overtime in addition to
this by the Environmental Services Manager.  Environmental Services have an out of hours
contact number for emergencies that arise out with our normal service delivery times.
2.5 Enforcement Policy
The Food and Business Regulation Team refer to and implement South Lanarkshire Council’s
‘Environmental Services Enforcement Policy’, when conducting our statutory functions in
respect of food law enforcement.  The current version of this policy was published on South
Lanarkshire Council’s website in 2016 and the link can be found here: 
https://www.southlanarkshire.gov.uk/downloads/download/251/environmental_services_enforcem
ent_policy_and_guidance
We seek to adopt a graduated approach to enforcement as set out in the above
Enforcement Policy, whilst aligning with Food Standard’s Scotland’s Strategic aim of
ensuring responsible businesses flourish, and the Scottish Government’s approach to better
regulation as set out in the Scottish Regulators’ Strategic Code of Practice.  Enforcement
action will be reserved for incidences where the seriousness of a situation warrants such
action, or in cases where adopting a graduated approach to enforcement has been
unsuccessful. 
155

Page 156

3. Service Delivery
3.1 Interventions at Food Business Establishments
Background
As a result of the Covid-19 pandemic the majority of routine food law inspections ceased
between the end of March 2020 and the start of September 2021 to allow Local Authorities
to undertake wider public health duties related to Covid-19, with the exception of the
highest risk premises and approved premises, where remote interventions were conducted.   
Ahead of the restart of official control interventions in all food establishments, on 1st
September 2021, South Lanarkshire Council produced a revised 4-year intervention
programme incorporating all food establishments which required to be inspected from 1st
September 2021 until 31st August 2025.  The first 6 months of this programme focussed on
conducting interventions in the highest risk food establishments, including those previously
‘unrated’, ie – businesses who had registered with South Lanarkshire Council but had yet to
receive their first food law intervention, and in around half of our Approved establishments. 
The following 12 months focussed on completing inspections of all our approved
establishments, continuing to focus on the highest risk food establishments, including
higher risk ‘unrated’ food businesses, whilst bringing in some of the medium risk premises. 
Overall, during the first 18 months of this programme 87.5% of all planned interventions
were conducted within this timeframe, in addition to visits to approved establishments;
visits regenerated following initial FLRS inspections; and interventions conducted in new
high-risk unrated establishments.  During the final month of 22/23 and throughout 23/24
and 24/25 the level of regenerated visits due; coupled with the planned intervention
programme, interventions in approved establishments, and interventions in new high-risk
unrated establishments meant that the number of interventions due exceeded the available
resources to conduct such interventions.  Interventions were therefore prioritised in line
with both the 2023/24 and 2024/25 Service Plans; and will continue to be prioritised in this
manner during 2025/26, as outlined below.
Interventions Due in 2025/2026
The Food & Business Regulation team will select and prioritise interventions at food
business establishments primarily based on frequencies outlined in the Interventions Food
Law Code of Practice (Scotland) 2019.  For approved establishments interventions will now
be spread out over a year in line with FSS’s Official Control Verification (OCV)
implementation guide, and for primary production establishments intervention frequencies
will be based on those outlined in the Food Law Code of Practice (Scotland) 2019, Annex 5. 
New food businesses who register with South Lanarkshire Council will be inspected and
prioritised on a ‘risk based’ basis taking account of groups set out in the Interventions Food
Law Code of Practice (Scotland) 2019 with Group 1 & 2 premises being prioritised, but also
on the basis of risk associated with that premises type.  For example, caterers handing raw
and ready to eat foods will be prioritised over caterers providing low risk foods, or where
the risk of cross contamination is negligible.  We aim to inspect all high-risk unrated
premises within 3 months of them registering with South Lanarkshire Council.  In the event
156

Page 157

that we are unable to complete all interventions planned for the year due to the increase in
numbers of interventions due annually as a result of the move to the ‘Food Law Rating
Scheme’, sickness absence or due to dealing with a serious incident, high risk unrated food
establishments will be prioritised over lower risk planned interventions.  We sought, during
2023/2024 to incorporate Group 2B businesses not yet inspected due to previous high
standard of compliance, but who serve vulnerable populations, such as care homes for the
elderly and pre-school nurseries into our inspection programme.  We inspected a number of
these during 2023/24 and have continued to incorporate any outstanding establishments
during 2024/2025, along with prioritising the inspection of almost all primary and secondary
schools operating in South Lanarkshire.  The few remaining schools not inspected in
2024/25 will be inspected early in 2025/26.
Currently, planned/recovery inspections due in 25/26 (as set out when our recovery plan
was drawn up in the spring/summer of 2021), including a breakdown of groups and bands
are as follows:
Group Band Number or Premises to be
Inspected in 25/26
Group 1 A 9 
B 39 
C 22 
D 5 
E 0
Group 2 A 4 
B 121 
C 391 
D 70 
E 1
Group 3 A 0 
B 152 
C 14 
D 3 
E 0 
The above planned inspections/recovery visits will make up a proportion of the
interventions being conducted in 25/26, along with interventions in high-risk premises
generated further to inspections carried out during 25/26, and unrated premises.  For 25/26
Inspections of approved establishments are included in the figures contained in the above
table.  In addition, due to previous prioritisation exercises undertaken since March 2023,
367 Group 2 or 3 B & C risk establishments inspected since the restart of official controls
and found to be broadly compliant with food law have been temporarily removed from the
intervention programme to accommodate higher risk establishments.  These too will be
prioritised in line with the criteria set out above, along with the 914 premises that were due
to receive an intervention prior to the end of August 2025 but have yet to receive one.  This
list consists of 333 Group 2 establishments, 1 of which is Band A and 259 of which are Band
157

Page 158

B indicating high levels of compliance, 70 of which are band C, and 3 unrated
establishments, one of which has been closed for refurbishment for some time; and a
further 582 of which are low risk Group 3 establishments.  Intervention lists are generated
on a monthly basis to allow for high-risk unrated premises to be incorporated as and when
required, while at the same time affording an opportunity to incorporate missed recovery
visits and previously inspected higher risk broadly compliant premises where resources
allow.  Unrated premises will be given a nominal date of 1/1/40 to allow them to be located
easily and prioritised monthly, based initially on risk and thereafter on the date they first
registered with the Council, with those who registered first being prioritised and inspected
first.  The average number of revisits expected to be conducted in 25/26 will be around 100-
150, based on the number carried out in the first three years of implementing the Food Law
Rating Scheme.  In addition, it is anticipated that an additional 70-80 revisits will be
conducted specifically in relation to the Food Hygiene Information Scheme (FHIS).
South Lanarkshire Council currently employ 11.99 full-time equivalent (FTE) Environmental
Health/Food Safety Officer’s to conduct food law tasks including interventions, revisits,
complaint investigations, sampling and other food law service demands.    
Officer’s conducting interventions undertake a minimum of 10 hours CPD per annum and in
the past 4/5 years all but two officers within the Food and Business Regulation team have
completed Official Control Verification (OCV) training provided by Food Standards Scotland. 
In addition, 7 Officers have successfully completed Level 4 HACCP training, and training is
also sought and provided for officers required to inspect specialised processes.  We
currently have 3 officers with specialist training in cheesemaking and a further 3 who have
attended specialist training on Bivalve Shellfish Hygiene and Verification.
3.2 Food Complaints
South Lanarkshire Council will investigate food complaints taking action proportionate to
risk whilst following our ‘Food Safety Enforcement & Inspection Guidelines’.  We aim to
respond to all food complaints within 2 working days.  On average the Food & Business
regulation team receive and respond to around 82 food complaints a year relating to;
foreign body contamination of foods; microbiological and chemical contamination of foods,
and complaints relating to labelling, allergens and point of sale information.  Complaints
received during 2024 included allegations of a piece of metal in a pastry, a fingernail in a
pizza, an insect in a coffee and maggots in cheese.  A further 86 complaints a year relating to
the hygiene of premises are also received and responded to by officers of the Council’s Food
& Business regulation team.  Complaints are responded to utilising existing resources.
Service Demand Type 2021
Figure
2022
Figure
2023
Figure
2024
Figure
Estimate of numbers
expected per annum based
on average in previous years
Food Hygiene
complaints
77 92 94 80 86
Food complaints
incorporating
allergens/POS,
101 70 75 80 82
158

Page 159

labelling,
chemical/composition,
micro and foreign
body 
3.3 Home Authority, Originating Authority, and Primary Authority
South Lanarkshire Council recognise and support the Home Authority principle (whereby the
Local Authority where the relevant decision-making base of a business is located agrees to
provide advice, guidance, and where required liaison between the business and other Local
Authorities for consistency of enforcement) and will have regard to any information and
advice received from Home and/or Originating Authorities.  Whilst no formal Home
Authority agreement exists in relation to food businesses within South Lanarkshire, we are
the Originating Authority for a number of large manufacturers.  As the Originating Authority
we will provide advice to these businesses on legal compliance where required.  
In addition, we will liaise with the Home and/or Originating Authorities of multi-site
businesses following interventions, on receipt of complaints or in the event of sample
failures where issues noted are or may be associated with the business’s centrally defined
policies and procedures.  In all cases we will seek to notify that authority of the outcome of
our investigations.
Primary Authorities are relevant only in England and Wales, however where such
partnerships have been established in respect of multi-site businesses the Home Authority
principle will continue to be applied by South Lanarkshire Council.
3.4 Advice to Businesses
The Food & Business Regulation team, as part of our graduated approach to enforcement,
provide advice to businesses as required at all routine interventions.  From time to time, for
example following the introduction of new legislation proactive communications will be
send out to relevant sectors.  Relevant reference materials will be provided to businesses
where required, in particular where new businesses seek advice prior to opening.  Links will
be provided to online reference materials such as ‘Cooksafe’, MyHACCP and free allergen
training, and visits prior to opening may be conducted where necessary.  The provision of all
such advice benefits the business by assisting them to comply, and the Local Authority by
potentially averting time-consuming enforcement action, which could have been avoided by
the provision of advice at the outset.  In addition, consumers will benefit from businesses
who have a greater knowledge of food safety requirements, and who in turn produce safer
food as a result.
An estimate of the number of requests for advice the team can expect to receive and
respond to on a reactive basis during 25/26 can be gleaned from looking at the number of
requests submitted in previous years:
Service Demand Type 2021
Figure
2022
Figure
2023
Figure
2024
Figure
Estimate of numbers
expected per annum based
on average in previous years
159

Page 160

Food Hygiene Advice 140 118 90 85 108
Food Standards Advice 171 126 87 77 115 
On average South Lanarkshire Council receive around 108 requests for food hygiene advice
each year, with a further 115 requests for advice being received in relation to food
standards.  We aim to respond to all requests for advice within 2 working days.  Requests
are responded to utilising existing resources.
3.5 Food Sampling
South Lanarkshire Council undertakes food sampling in accordance with current approved
codes of practice, regulations, and guidance.  Our food sampling policy is published on the
Council’s website, and a sampling programme detailing an estimate of the number of
samples to be taken is produced annually.  The programme is discussed with the Council’s
Public Analyst and is informed by guidance from Food Standards Scotland (FSS) and the
Scottish Food Enforcement Liaison Committee (SFELC), who produce an annual report
detailing suggested National sampling priorities.  
As well as the published national priorities the Council prioritises our own routine sampling
based on three broad categories:
Priority 1 – Samples required to meet statutory obligations: including complaint samples or
samples that require to be taken to investigate food related outbreaks and incidents.
Priority 2 – Samples required for effective food safety enforcement: including
microbiological samples taken from high-risk premises, and chemical samples from
producers, packers or importers sending food outwith South Lanarkshire Council
Priority 3 – Samples which give added value, or which support local initiatives and
projects:  including surveys and sampling to support local initiatives.
When undertaking sampling on the basis of the above priorities, where possible we will
always seek to integrate national priorities into our sampling activity.  This is achieved by
collecting the types of products outlined in FSS’s list of National Priorities when we sample
from our high-risk premises and local manufacturers.  The frequency of sampling of
individual food businesses based in South Lanarkshire is determined by employing a rating
scheme which takes into account a business’s food law risk rating and combines this with
the type of operations they carry out.  The rating scheme is designed to ensure that
businesses such as approved premises (not egg packers or cold stores/re-wrapping
establishments) and manufacturers of high-risk foods within South Lanarkshire Council are
sampled more frequently than local lower risk establishments.  The sampling programme
for 2025/26 sets an annual target of around 483 routine samples per annum, to be procured
by the Council’s food sampling officers.  Complaint/Incident related samples are taken in
addition to this routine sampling and in the event of large-scale incidents these samples will
take priority over routine sampling activities.   The Food & Business regulation team aim to
take part in Food Standards Scotland and West of Scotland Food Liaison group surveys
wherever possible, and where resources allow.
160

Page 161

South Lanarkshire Council have appointed Edinburgh Scientific Services, who are a
designated ‘Official Control Laboratory’, to provide Public Analyst and Food Examiner
services.  The contract for such services was awarded in 2021 for 4 years, with the option to
extend it in June 2025 for a further year to June 2026.  At the time of writing this Service
Plan, it is expected that this option to extend will be taken.
Routine sampling is currently being carried out by 4 food safety officers, who also carry out
routine food law inspections.  Complaint and incident related samples will be procured and
submitted by all suitably Authorised Officers of the Service, as and when sampling is
deemed necessary to investigate potential contraventions of food law.   
3.6 Control and Investigation of Outbreaks and Food Related Infectious Disease
South Lanarkshire Council investigate food poisoning notifications in line with a ‘Policy for
the routine investigation of foodborne infections’ developed and agreed with NHS
Lanarkshire and North Lanarkshire Council in May 2018.  An appendix contained within this
policy details the types of cases that require epidemiological investigation.  These include
bacteria, viruses, and parasites, such as E coli 0157 and other Shiga toxin-producing E coli
(STEC), Salmonella species, Clostridium perfringens, Clostridium botulinum, Shigella species,
Staphylococcus aureus, Bacillus cereus, Vibrio cholera, Hepatitis A, Giardia and
Cryptosporidiosis; and in addition, toxic forms of foodborne disease including scombroid. 
Surveillance of Campylobacter (the bacteria which results in the highest number of cases of
reported foodborne infection year on year) is conducted, however epidemiological
interviews are only undertaken where a case originates from a suspected outbreak.    
Public Health Scotland (PHS) publish data biennially on the incidence rate per 100,000
population of many of these organisms per health board area.  The most recent report from
2022-2023, published in October 2024 shows that Lanarkshire was above the Scotland wide
average for cases of Campylobacter, and for Salmonella in 2022 and 2023.  For all other
bacteria, viruses and parasites reported on, including E coli 0157, STEC, Cryptosporidium
and norovirus Lanarkshire was below the Scottish national average; with the exception of
Cryptosporidium in 2023 where the incidence rate was the same as the national average. 
The following table details the number of notifications received by South Lanarkshire
Council from 2020-2024.  The number of notifications received reduced significantly during
the Covid pandemic in 2020 and 2021, however in an average year the number of
notifications received would be expected to be in the region of 99 notifications per annum,
all of which are investigated by the Food & Business regulation team using existing
resources.
Service Demand
Type
2020
Figure
2021
Figure
2022
Figure
2023
Figure
2024
Figure
Estimate of numbers expected
per annum based on previous
years (excluding Covid in
2020/2021)
Infection Disease
Notifications
36 50 85 104 109 99 
161

Page 162

South Lanarkshire Council prioritise the investigation of outbreaks as and when we become
aware of them, or when they are notified to us.  Outbreak investigations are conducted in
accordance with the ‘Public Health Incident Plan’ developed by NHS Lanarkshire to deal with
such incidents, and where an outbreak is food related in accordance with the ‘Guidance on
the management of outbreaks of foodborne illness in Scotland’, published by Food
Standards Scotland and the Scottish Health Protection Network in February 2024.  South
Lanarkshire Council have in addition worked in partnership with NHS Lanarkshire and North
Lanarkshire Council to produce a Joint Health Protection Plan for the Lanarkshire area. This
is an important document which acts as a reference point for assisting in the investigation
and control of public health outbreaks and incidents.
3.7 Food Law Incidents
South Lanarkshire Council will respond to food law incidents and food alerts in accordance
with the processes outlined in Section 2 of the Food Law Code of Practice Scotland 2019. 
This includes categorising incidents and notifying FSS and other relevant agencies of all
serious localised and non-localised hazardous incidents by the quickest available means.  In
practice this will take the form of an initial telephone call followed up by submission of an
incident report form and subsequently updating any information or actions required on
FSS’s incident database ‘CLIO’.  All incidents will be investigated as a matter of priority. 
Out of hours contact details for South Lanarkshire Council’s Environmental Services Team
have been provided to FSS.
In relation to food alerts, again these will be responded to in accordance with the Food Law
Code of Practice Scotland 2019, with food alerts for action being responded to and actioned
without undue delay.  Product recall information notices and allergy alerts are logged and
circulated to all officers within the Food & Business regulation team for information and
awareness purposes.
Only 6 food alerts for action have been issued by FSS since 2018 therefore demand for such
actions is not expected to be high.  In respect of incidents/withdrawals/recalls South
Lanarkshire Council estimate that we may be involved in 3-4 incidents per annum, that each
will take around 2 days of officer time.  This estimate does not include serious incidents,
major investigations or reports to the procurator fiscal as these events can involve a number
of officers, can run for months or years and are therefore not able to be accurately
quantified. 
3.8 Liaison with Other Organisations
To facilitate efficient, effective and consistent enforcement with neighbouring Local
Authorities, South Lanarkshire Council attend and participate in the West of Scotland Food
Liaison Group (WSFLG).  South Lanarkshire Council currently chair this group which includes
representatives from a total of 13 Local Authorities based in the southwest of Scotland, a
162

Page 163

Public Analyst representing Glasgow Scientific Services, and representatives from Food
Standards Scotland.  The group provides a forum for the discussion of relevant topics,
sharing best practice guidance, initiating surveys or projects and co-ordinating specific
investigations.  This local liaison group, along with other similar groups in the North, East
and in Lothian & Borders support the work of the national Scottish Food Enforcement
Liaison Committee (SFELC). The Scottish Food Enforcement Liaison Committee supports the
work of FSS by providing information and expert advice in relation to food law enforcement.
SFELC contributes to the development and implementation of FSS strategies and policies. 
As the chair of the WSFLG South Lanarkshire Council are represented on SFELC.  We
previously chaired one of the SFELC task groups on Specialist Cheese and following the
easing of restrictions during the pandemic, in addition chaired a subgroup of a SFELC
working group looking at Local Authority Food Law recovery.  Currently we are represented
on the Mobile Food Traders Task Group.  We have also been involved in recent years with a
working group chaired by Food Standards Scotland looking at the future of interventions at
dairy farms.
South Lanarkshire Council liaise with NHS Lanarkshire and North Lanarkshire Council and
have produced a Joint Health Protection Plan for the Lanarkshire area (2013-2015), as well
as agreeing procedures to be followed in the investigation of infectious diseases and in the
investigation and control of public health outbreaks and incidents.  We are represented on
the Scottish Health Protection Network (SHPN) STEC subgroup, which consists of members
including Health Protection Scotland, the Scottish E.coli Reference laboratory, Consultants in
Public Health Medicine from health boards, Food Standards Scotland, the Health and Safety
Executive, Microbiologists from diagnostic laboratories and Scottish Government health
protection colleagues.  This group is tasked with overseeing the completion of outstanding
recommendations contained in Scotland’s VTEC/E coli 0157 action plan.  In addition, we
liaise with our own Public Analyst, Edinburgh Scientific Services regarding our annual
sampling programme, and with Food Standards Scotland in relation to the sampling of
bottled water and other routine sampling surveys.
Internally the Food & Business regulation team review applications and consult with
planning and building standards on the structural requirements required to meet Food Law
requirements for new food businesses.   We consult with our Licensing colleagues in relation
to issuing certificates of compliance to street traders and Section 50 food hygiene
certificates to persons submitting applications for a premises licence under the Licensing
(Scotland) Act 2005.  We also consult with licensing in respect of small-scale local events
where food may be provided and are represented on the Council’s Safety Advisory Group
(SAG) which coordinates and considers larger scale event applications to South Lanarkshire
Council.  Larger events in 2024 included a music festival and a fireworks event.  All liaison is
conducted using existing resources.
3.9 Food Law promotional work, and other non-Official Controls interventions
South Lanarkshire Council have for some years now utilised the option in the Food Law Code
of Practice (Scotland) 2019 to alternate between Official Control and non-Official Control
interventions for primary production establishments D rated in accordance with Annex 5 of
163

Page 164

the Code, specifically in relation to food hygiene interventions conducted at dairy farms. 
Due to the low-risk nature of these activities versus the higher risk recovery visits planned
for 2025/26 these establishments will not feature in our interventions programme this year. 
South Lanarkshire Council are however represented on a working group chaired by Food
Standards Scotland looking at the future of interventions at dairy farms and previously
piloted remote interventions in such establishments as part of this project.
Officers within Food & Business regulation will continue during 2025/26 to offer advice to
new and existing food business operators in response to enquiries and during routine
interactions.  We use, promote and provide copies of Cooksafe as well as directing
businesses to other online resources, including free allergen training, as and when required. 
In addition, advice is provided to all low-risk food businesses who register with us but who
will not receive a proactive intervention as set out in the Interventions Food Law Code of
Practice (Scotland) 2019.  In particular this information contains advice on the requirements
for allergens to specifically target businesses producing low risk foods based on a domestic
dwelling.
South Lanarkshire Council will continue to support and promote Food Standards Scotland’s
‘Eatsafe’ Award Scheme.  Currently 144 food business establishments hold this award within
South Lanarkshire, many of which are schools.  All non-official control activities will be
undertaken using existing resources.
3.10 Food Crime and Fraudulent activities
Food fraud and/or food crime is defined in the Food Law Code of Practice (Scotland) 2019 as
‘serious dishonesty that impacts detrimentally on either the safety or the authenticity of
food’.  Where food fraud and/or food crime is detected by officers of South Lanarkshire
Council in the course of our duties our policy as set out in the Code is that we will contact
Food Standard’s Scotland’s ‘Scottish Food Crime and Incidents Unit’ at the earliest
opportunity in order that where necessary a joint investigation can be instigated.    In
addition, where officers of South Lanarkshire Council obtain or gather evidence that may be
used to support wider investigations relating to food fraud and/or food crime we will report
this information via the shared intelligence database known as ‘CLUE’.  It is difficult to
estimate the resources required to deal with food crime, however where a serious risk to
public health exists any such situation will be awarded the highest priority utilising all
available resources. 
164

Page 165

4. Finance and Staffing
4.1 Financial Allocation
Environmental Services does not have a separate cost centre for the 3 sections which
operate within Environmental Health. The budget allocation for the Food and Business
Regulation team has not been reduced in recent years.
In relation to the establishment, the number posts in the Food and Business Regulation
team remained constant since 2018/19 until it was slightly increased from September 2023
by 0.27FTE.  The increase was due to a transfer of resource from the Public Health &
Housing team.  During 24/25, the overall establishment decreased by 0.12FTE, however
despite this the overall FTE spent on food law activities increased from 11.2 to 11.99FTE. 
This was largely as a result of our previous sampling officer qualifying as a Food Safety
Officer during 24/25 and subsequently being appointed to work in that capacity.  In
addition, one Environmental health officer returning from maternity leave reduced their
hours slightly, whilst another had a slight increase.  The sampling officer post vacated, which
equated to 0.6FTE spent on food law activities is currently vacant, with sampling activities
being split between our 4 food safety officers.  
4.2 Staffing Allocation
South Lanarkshire Council’s Food & Business regulation team carries out functions including
food safety, occupational health and safety, infectious disease investigations and caravan
site licensing.  Approximately 87% of Environmental Health Officer time is currently spent on
our food safety function, with this increasing to 95% for Food Safety Officers.  The team is
overseen by the Environmental Services Manager who is the budget holder and is a qualified
Environmental Health Officer (EHO).  The day-to-day management of the team is the
responsibility of a Divisional Environmental Health Officer who is also the Lead Food Officer,
and who is assisted by 1.8 Environmental Health Team Leaders, all of whom are fully
qualified EHO’s.  The team currently have an establishment of 13.45 full time equivalent
(FTE) front line Environmental Health Officers/Food Safety Officers to carry out tasks
including food safety tasks required by the Food Law Code of Practice (Scotland) 2019.  We
currently have one vacancy for a sampling officer at the start of 2025/26, which if filled
would equate to an additional 0.6FTE being spent on food safety tasks, with the resultant
0.4FTE able to be spent on training a future Environmental Health Officer or Food Safety
Officer.  The breakdown of FTE posts in terms of the number of staff working on the delivery
of food Official and Non-Official controls and including vacant posts is as follows:
Job Title Qualification Authorisation Level FTE allocated to
Food Law Code of
Practice Tasks
Environmental
Services Manager
Fully qualified EHO
with over 2 years’
experience
Fully authorised to
conduct all Food
Law Code of Practice
Tasks
0.2
165

Page 166

Divisional
Environmental
Health Officer (Lead
Food Officer) 
Fully qualified EHO
with over 2 years’
experience
Fully authorised to
conduct all Food
Law Code of Practice
Tasks
0.8
Environmental
Health Team
Leaders x 2 (1 full
time and 1 part
time)
Fully qualified EHO’s
with over 2 years’
experience
Fully authorised to
conduct all Food
Law Code of Practice
Tasks
1.35
Environmental
Health Officers (7
full time and 4 part
time)
All fully qualified
EHO’s.  One full time
officer has less than
2 years’ experience.
Fully authorised to
conduct all Food
Law Code of Practice
Tasks.  Officer with
less than 2 years’
experience will not
inspect complex
processes or issue
RAN’s or HEPN’s
8.57
Food Safety Officer
x4 (3 full time and 1
part time)
Fully qualified
Holders of the
Higher Certificate in
Food Hygiene and
Food Standards
Inspection with over
2 years’ experience
Authorised to
conduct all Official
Controls with the
exception of the
seizure and
detention of food
3.42
Technical Assistant
(Sampling Officer) x
1
Student FSO, no
Food Law Code of
Practice Official
Control
qualifications held
Authorised to
conduct Non-Official
Controls only under
the supervision of
Fully Authorised
EHO’s/FSO’s
Vacant (0.6)  
4.3 Staff Development Plan
All staff within South Lanarkshire Council undergo an annual Performance Appraisal, which
as well as assessing performance during the previous year also assesses future training
needs.  Environmental Services produce an annual learning and development priorities
matrix which details training which the Service will seek to provide to staff each year.  For
Food & Business Regulation staff this includes standing items such as 10 hours of Food
safety related CPD, Level 4 HACCP and OCV training.  Other new and/or emerging issues are
added as required, along with any sector specific training in complex processes.  Training is
identified annually and if this cannot be conducted in house external training will be sought.  
All officer’s conducting Official control interventions undertake a minimum of 10 hours CPD
per annum and in the past 3-4 years all but two officers within the Food and Business
Regulation team have completed Official Control Verification (OCV) training provided by
166

Page 167

Food Standards Scotland.  In addition, 7 Officers have successfully completed Level 4 HACCP
training, and training has been sought and provided for officers required to inspect
specialised processes.  We currently have 3 officers with specialist training in cheesemaking
and a further 3 who have attended specialist training on Bivalve Shellfish Hygiene and
Verification.  South Lanarkshire Council will continue our programme of training during
25/26, ensuring all newly qualified officer’s undertake Level 4 HACCP and OCV training
(where available) and that any additional specialist training is provided for officer’s where
necessary.
Student EHO’s have an appointed training officer within South Lanarkshire Council who
ensures they are provided with the training they require to competently progress to sitting
their professional examinations.  During this time, they will be included in much of the
training offered to qualified officer’s as well as any additional training specific to their
needs.  Newly qualified officers will be supervised and mentored until the Lead Food Officer
deems them competent to inspect all types of food establishment.  Upon qualification they
will be supervised for at least 3 months and will not initially be tasked with inspecting
approved premises or high-risk manufacturers but may be appointed as 2nd officers for such
establishments.  This will allow them to gain on the job experience, training and mentoring,
such that once they have completed Level 4 HACCP and OCV, together with on-the-job
training and mentoring they may then be deemed competent to inspect these types of
establishments. 
4.4  Estimate of Resources
The number of officers allocated to food law enforcement is the minimum required to
deliver effective food official controls. There is no capacity to accommodate prolonged
absences, and this may require available resources to be reprioritised during 2025/26, as in
previous years. 
5. Monitoring
5.1 Quality assessment and internal monitoring
Internal monitoring was not conducted in South Lanarkshire Council during the pause in
food law interventions as a result of the pandemic in 20/21 and 21/22, however the desktop
transfer process ahead of the restart of food law interventions in September 2021 did
provide the opportunity for some internal monitoring to be conducted in terms of the
accuracy of our database of food establishments, including looking at risk groups and
categories, and in some cases also at officer risk scoring.  This type of monitoring, along with
accompanied visits continued during 22/23, 23/24 and 24/25.  Documented internal
monitoring procedures were updated during 23/24, and South Lanarkshire Council aim to
utilise these procedures to further monitor the progress, quality and consistency of
interventions undertaken by the Authority during 25/26.
Monthly checks have been conducted since September 2021 to check that all high-risk
establishments are inspected within the timescales indicated in the Interventions Food Law
167

Page 168

Code of Practice (Scotland); to ensure that inspections are not overdue or missed; and to
check that high risk establishments are being prioritised by officers for inspection.  In
addition, accompanied inspections are regularly carried out by the Service’s two team
leaders to provide mentoring and assistance with complex cases, and all notices issued are
reviewed and approved by the Divisional Environmental Health Officer or Team Leaders
prior to being served.   During 25/26 this will be supplemented with completion of a quality
monitoring checklist, which was updated in 23/24 and is designed to assess:
• Adherence to our planned intervention programme;
• Compliance with Codes of Practice and FSS guidance;
• The consistent assessment of intervention ratings;
• Appropriate use of relevant inspection documentation;
• Compliance with internal procedures, policies and the Food Authority’s enforcement
policy;
• That action taken following interventions is consistent with FSS and/or SFELC
guidance; and
• That Authorised Officers are aware of and have access to Industry Codes of Practice
and have due regard to published UK or EU guides to good practice.
The Food and Business Regulation team report quarterly, through South Lanarkshire
Council’s own internal monitoring systems, the % of businesses inspected within South
Lanarkshire Council who are broadly compliant with Food Law requirements.  The target set
for this measure is currently 85% of all businesses inspected, however since the
implementation of the Food Law Rating Scheme in 2019 this service has seen a notable
increase in the percentage of premises reaching this target.  Currently the number of
premises broadly compliant with Food Law requirements is in the region of 95%. 
6. Review 
6.1 Review against the Service Plan for 2024/25
This Service Plan is reviewed annually by the Divisional Environmental Health Officer and
includes information on performance against the service plan, a review of performance
targets or of targeted outcomes set.  This comprised a review of how the Service performed
against the priorities and intervention timescales detailed in the Local Authority Recovery
Project Report issued by Food Standards Scotland on 16 October 2020.  Our performance
was also assessed in respect of the timescales set out in the Interventions Food Law Code of
Practice (Scotland) for businesses which have been inspected at least once since the re-start
of inspections in September 2021.  These same standards will be assessed for 25/26.  The %
of businesses inspected within South Lanarkshire Council who are broadly compliant with
Food Law requirements will continue to be reported via the Council’s internal monitoring
system on a quarterly basis.
The review of our performance during 24/25, can be summarised as follows:
168

Page 169

During 24/25 South Lanarkshire Council, when combining interventions due in respect of
intervention timescales detailed in the Local Authority Recovery Project Report issued by
Food Standards Scotland on 16 October 2020 with those interventions due as a result of
visits regenerated following initial FLRS inspections (including approved establishments),
were due to conduct interventions in 1204 food establishments.  This figure was not
inclusive of additional interventions to be conducted throughout the year including visits
regenerated during the year following initial FLRS inspections; interventions conducted in
high-risk unrated establishments that were incorporated during this timeframe and
interventions missed in previous years that were incorporated back into the inspection
programme.  
The level of interventions due in 24/25 far exceeded the available resources to deliver the
food safety service plan and as such interventions required to be prioritised, as outlined in
the ’Service Delivery’ section above.
During 24/25 a total of 943 interventions were conducted, with a further 122 premises due
an intervention at the start of the year noted to have closed in this same period. 
Interventions conducted included all approved establishments and all high-risk Group 1 and
Band D & E rated establishments, including those regenerated throughout the year.  In
addition, interventions planned at the start of the year were conducted in a total of 274
Group 2, Band C rated establishments with a further 67 of these noted to have closed; and
in 33 Group 2, Band B rated establishments with a further 7 of these noted to have closed. 
In addition, interventions were conducted in 14 Group 2 unrated establishments
incorporated at the start of the year.  Finally, a total of 6 interventions were conducted in
Group 3, Band B, Band C, and unrated establishments.  Interventions in addition to those
outlined above were of high-risk unrated establishments incorporated during this
timeframe; and schools located in South Lanarkshire Council area, that due to being broadly
compliant establishments were not incorporated in previous years inspection programmes
as originally planned.
Inspections not carried out in 24/25 consisted of Group 2 Band A, B & C rated
establishments and Group 3 Band B & C rated establishments.  Visits not undertaken
consisted of establishments contained in our original recovery programme but deemed to
be low risk and/or have historically demonstrated high standards of food law compliance; or
generally compliant or very compliant establishments which had been inspected since the
re-start of our food law programme in September 2021.  These scheduled interventions
were moved to later in the programme to accommodate; higher risk visits regenerated
following previous inspections; high-risk unrated establishments; and medium risk recovery
visits missed since the start of our recovery programme.  A total of 1 Group 2, Band C; 3
Group 2, Band B; 1 Group 2, Band A; 1 Group 2 unrated; and 464 Group 3 Bands B & C rated
recovery visits were moved to later in the programme during 24/25 to accommodate higher
risk interventions.  In addition, 81 Group 2, Band C; 48 Group 2, Band B; 2 Group 2, Band A;
and 23 Group 3, Bands B & C rated establishments, inspected at least once since September
2021 and found to be broadly complaint with food safety requirements, were moved to
169

Page 170

later in the programme during 24/25 to accommodate higher risk interventions.  This
reprioritisation is in line with the process outlined in the ’Service Delivery’ section above. 
We will continue to prioritise our interventions schedule in this manner in 2025/26 to reflect
available resources throughout the year.
In summary, (excluding closed premises) 42% of interventions scheduled for 24/25 were
carried out with 10% of interventions due overall, not able to be conducted as the
establishments had closed.  In addition, a further 490 unscheduled interventions were
completed.  Many of these unscheduled interventions related to high-risk establishments
with approximately 172 of them being conducted as a result of regenerated Band D and E
rated establishments throughout 24/25.  These inspections are time consuming due to the
nature of the risk and complexities involved. In some cases, these interventions resulted in
the need for formal action, which requires corroboration.  A new resource pressure
emerged in the final quarter of 23/24, and continued during 24/25, when a change to the
inspection system for approved establishments commenced. The changes introduced by
Food Standards Scotland for these businesses, resulted in more resources being diverted to
approved establishments than would have been the case in previous years.  The
performance of the Food & Business Regulation team during 24/25 has been commendable,
particularly in the context of having 1 full time EHO’s on maternity leave, from April to
December 2024.  The team has also experienced resourcing pressures arising from long
term absence during the year.  This level of deficit in resources could not be foreseen when
our recovery plan was developed.  The overall performance of the team would have been
stronger throughout 24/25 if these pressures had not occurred.  
Overall, the resourcing pressures facing the team are similar to the situation in the majority
of councils across Scotland. FSS has estimated an addition 180 FTE officers would be
required across Scotland to deliver official food controls as set out in the Code of Practice
and deliver the changes they have introduced to the food safety inspection programmes.
Recognising the position Councils are in, FSS has initiated a project to review food safety
delivery systems in Scotland, so they are more realistically aligned with available resources.
6.2 Areas of Improvement
Any areas identified as requiring action following on from the review and quality
assessment/internal monitoring processes will be addressed by the Food & Business
Regulation extended management team.  Action taken shall range from immediate action to
inclusion in the Service Plan for future years.  
Many of the issues in terms of resourcing during 24/25 were out with our control, however
the Service have taken steps to ensure that going forward we can maximise the number of
available resources we are able to devote to food law interventions.  We took steps in the
final quarter of 24/25 to recruit a recently qualified Food Safety Officer, who had been
working as our sampling officer to a Food Safety Officer’s post.  Whilst this has meant that
we have had to redistribute sampling duties between this officer and 3 of our other Food
Safety Officers; in turn reducing each officer’s capacity for conducting food law
interventions slightly, this has resulted in an overall increase in the number of interventions
170

Page 171

we are able to carry out in a year.  We are aiming during 25/26 to recruit a replacement
food sampling officer, which will result in a further overall increase in our capacity to carry
out food law interventions, as it will free up more Food Safety Officer time.  In addition, an
EHO on maternity leave since the start of 24/25 returned to us for the final quarter of the
year; and we are hopeful that another EHO currently on long term sickness absence will be
able to return to work in the very near future.
South Lanarkshire Council were last audited by Food Standards Scotland in February 2023. 
Areas for improvement were detailed in an action plan, which the Food & Business
Regulation team worked during 23/24 to address.  All issues raised were actioned, the audit
action plan signed off by Food Standards Scotland and the final audit report published.  A
link to the report can be found here: Audit and monitoring | Food Standards Scotland 
171

Page 172

172

Page 173

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Renewable Energy Fund – Mill Rig Windfarm
Contributions 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval for community benefit payments generated from Mill Rig Windfarm
to be administered through the Renewable Energy Fund (REF)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s REF incorporate provision for the receipt and disbursement of
community benefit payments in respect of Mill Rig Windfarm. 
3. Background
3.1. Through its Renewable Energy Community Benefits Policy, the Council has sought
annual community benefit payments of £5,000 per megawatt (MW) index linked from
windfarm developments. This is aligned with the Scottish Government’s Good Practice
Principles for Onshore Energy Development recommendations published in 2015 that
identifies the opportunity for communities to share in the benefits from their local
energy resource. These contribution rates are guidance only as neither the Scottish
Government nor the Council can oblige developers to provide community benefit
contributions or that the Council administers the Community Benefit funds. 
3.2. These agreements with developers place an obligation on the Council to administer
community benefit funding received through the REF processes. The REF currently
manages community benefits from some 44 windfarms. 
3.3. A number of changes were approved at the 6 February 2024 Community and
Enterprise Resources Committee to help the Fund deliver more strategic projects. 
These changes included setting seven priorities as listed below: - 
1.) transport and connectivity
2.) recreation and community facilities
3.) rural entrepreneurial activities and business infrastructure
4.) jobs, training and employability
5.) environmental and net zero sustainability
6.) rural poverty and wellbeing
7.) tourist and visitor infrastructure to support tourism and business  
15
173

Page 174

Amendments to the intervention levels and criteria were also approved and are listed
below:- 
 an ability to fund revenue projects for up to three years in addition to capital
projects
 increase the small grants level to 100% funding up to £20k
 increase the large grant maximum to 75% and in specific areas and with
conditions up to 100% grants would be available
 introduce a Rural Facilities Sustainability Fund to help communities consider
asset ownership and retain facilities for a period of up to three years
 in consultation with communities, Community and Enterprise Resources will
develop larger more complex community projects on behalf of local communities
and local needs focusing around the strategic challenges 
4. Eligible Areas for Distribution of REF Grants from Windfarm Sites
4.1. Mill Rig Windfarm is located near Drumclog within South Lanarkshire at the boundary
with East Ayrshire Council with access and power lines to the site via East Ayrshire. 
The windfarm was developed by Banks Renewables with consent granted in March
2024. The windfarm is now owned by Onpath Energy and is currently under
construction. The windfarm consists of 5 turbines with a maximum power generation
of 33.4 MW per annum. 
4.2. The developer has agreed with local communities and officers from both councils that
the eligible funding area will include the community councils in East Ayrshire and
South Lanarkshire within 10km of the windfarm.  These being Sandford and Upper
Avondale, Darvel, Murkirk, Sorn and Newmilns. The eligible area for Mill Rig funds is
identified in Appendix 1. 
4.3. The legal agreement provides a total of £5,000 per MW per annum of Community
Benefit Funds totalling £167,000 per annum. The annual contributions will commence
in Spring 2026 and is index linked from 2025. 
4.4. Similar to the existing Council administered Clyde Windfarm Fund a panel of two
representatives from each of the five community councils will appraise and
recommend applications for approval. 
5. Employee Implications
5.1. These additional REF contributions will be managed using existing Enterprise and
Sustainability Development Services staff. 
6. Financial Implications
6.1. Due to the cross boundary funding a higher management fee of 8% per annum will be
received, estimated at £13k in the first year. There are no additional financial
implications for the Council in managing the proposed new funds. Funding can only
be dispersed to projects located within the eligible areas once funds have been
received from the developer and the developers has made initial year one payments. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The environment and net zero sustainability is one of the seven priorities for the
Community Benefit Fund agreed at the Community and Enterprise Committee of 6
February 2024. The fund will therefore be able to support climate action and
sustainability projects with communities.    
174

Page 175

8. Other Implications
8.1. The funds will assist in delivering the Community Wealth Building aims, in areas such
as retaining wealth locally, community ownership. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. Each of these developments have undertaken consultation following the Scottish
Government’s Good Practice Principles for Onshore Energy Development
recommendations involving local communities and Community Councils. 
David Booth
Executive Director ( Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Executive Committee 3 March 2004, “Community Benefit: Establishment of a
Renewable Energy Fund” 
 Executive Committee 1 December 2010, Renewable Energy Developments and
Community Benefit. 
 Enterprise Services Committee 1 April 2014, Scottish Government Consultation on
Good Practice Principles for Community Benefits from Onshore Renewable Energy
Developments 
List of Background Papers
 Planning consents Mill Rig Windfarm 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kenny Lean, Programme Manager, Enterprise and Sustainability Development Services
Ext:    (Tel: 07469027925 )
E-mail:  kenny.lean@southlanarkshire.gov.uk 
175

Page 176

176

Page 177

Mill Rig Windfarm Community Benefit (CB)
South Lanarkshire
East Ayrshire
© Crown Copyright. Unauthorised reproduction infringes Crown
Copyright and may lead to prosecution or civil proceedings.
South Lanarkshire Council 100020730. Not to scale/Indicative only
KEY
Mill Rig Windfarm
SLC boundary
Sandford Community Council
Darvel Community Council
Newmilns Community Council
Sorn Community Council
Muirkirk Community Council
123
4 5
1
2
3
4
5
15
177

Page 178

178

Page 179

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to grant applications to the Renewable Energy Fund
(REF) for:- 
 Douglas Community Development Company
 Hollandbush Golf Club
 [1purp]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a grant be awarded to Douglas Community Development Company of up to
£35,100 from the Renewable Energy Fund to appoint consultants; and
(2) that a grant be awarded to Hollandbush Golf Club of up to £155,892 from the
Renewable Energy Fund to purchase course maintenance equipment.  
[1recs]
3. Background
3.1. Since 2004, the Council has collected and administered community benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing the contributions from windfarm developers, advising
potential applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities. 
3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority. All grants awarded are reported annually to the Community and
Enterprise Resources Committee. 
3.3. Several changes were made to the REF criteria at the Community and Enterprise
Resources Committee of 6 February 2024 including supporting revenue funding,
increases to intervention levels and aiming to deliver larger more strategically
impactful projects.  
16
179

Page 180

4. Grant Recommendation
4.1. Application Number 1302 
Douglas Community Development Company – project value £70,200 
Proposed Grant award £35,100 intervention rate of 50% 
The proposed grant of £35,100 will be funded from Gallawhistle Windfarm which
contributes into the Renewable Energy Fund 
4.2. Douglas Community Development Company (DCDC) is a community group with its
purpose being:- 
The Douglas Community Development Company (DCDC) is a charity established
in 2019, dedicated to enhancing the social, economic, and environmental well-being
of the community in and around Douglas, South Lanarkshire. Run by a passionate
group of volunteers, DCDC aims to address local challenges and improve the
quality of life for residents through a range of community-driven initiatives. 
4.3. DCDC has a seven-member management committee and 49 members, and it is an
integral part of the Douglas community.  DCDC core projects are the redevelopment
of the Douglas Arms Hotel and the reinstatement of the Crabtree Park sports pavilion.
These projects have been identified as part of the community action plan. 
4.4. The grant will allow DCDC to appoint external consultants, who will provide expert
support in developing and delivering two major regeneration projects in Douglas. The
group carried out a tender and evaluation process to ensure appropriate consultants
are appointed to prepare a feasibility with a financial funding package and detailed
architectural plans for the restoration of two derelict building in the Douglas area. 
4.5. The project requires capital funding to drive forward the two major regeneration
initiatives in Douglas by appointing Specialist Development Services to help secure
investment, manage risks, and drive community-led regeneration, creating lasting
social and economic benefits for Douglas. 
4.6. The project has been established as part of the local action plan produced by the local
community.  DCDC has carried out extensive community consultation, demonstrating
strong local support for both projects. The Douglas and Glespin Community Action
Plan 2024 identifies these developments as priorities.  
4.7. The application has been assessed and scored an average of 35 out of 53 supporting
a grant award of up to £35,100 totalling 50% of eligible costs. 
4.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below: 
Funder Stage Value
Coalburn, Douglas and Glespin
Community Fund
To be confirmed £35,100
SLC Renewable Energy Fund Grant
(50%) Gallawhistle.
For approval £35,100
Total project value   £70,200  
4.9. The consultancy work is scheduled to commence in September 2025 and be complete
by December 2026. Officers will work with the applicant to monitor progress and any
impact on the timescales and allow officers to confirm Coalburn, Douglas and Glespin
Community Fund has been secured to complete the consultancy work. 
180

Page 181

5. Grant Recommendation
5.1. Application Number 1355 
Hollandbush Golf Club – project value £210,892   
Proposed Grant award £155,892 intervention rate of 74% 
The proposed grant of £155,892 will be funded from Gallawhistle Windfarm which
contributed to the REF. 
5.2. Hollandbush Golf Club SCIO (HGC) is a charity with its purpose being:- 
The long-term vision for Hollandbush Golf Club (SCIO) is to provide an improved
golfing and social experience for Hollandbush golf course members and the local
community. The purpose of community ownership of this asset is to allow the
community to determine the strategic direction for future development. 
5.3. HGC management committee has nine members, 11 regular volunteers and 286
members. 
5.4. The grant will allow HGC to safeguard the future of HGC to secure continued access
to golf for the local community, preserve a valuable green space, support physical and
social wellbeing across all age groups, safeguard and create future jobs opportunities.
HGC will stimulate socio-economic activity and potentially increase tourism activities. 
5.5. HGC submitted an application for a Community Asset Transfer to run the facility which
was approved at Housing and Technical Resources Committee in February 2025. 
HGC have yet to formally accept the offer of a CAT which has a long stop date of 12
September 2025.  On the basis that it is formally accepted, the anticipated transfer
date is January 2026.  This grant will allow the group to purchase golf course
maintenance equipment and continue the course management. HGC (SCIO) intend
to employ a similar staffing level of South Lanarkshire Leisure and Culture to ensure
the course is maintained to the highest standards throughout the year. 
5.6. The project requires capital funding to purchase essential course maintenance
machinery which includes a tractor, greens mower, fairway mower, rough and trim
mower and a utility vehicle to ensure the course is maintained to a high standard for
members, local community and visitors to the area. 
5.7. The project has been established with an initial public consultation process which will
feed into the community action plan. 
5.8. The application has been assessed and scored an average of 35 out of 53 supporting
a grant award of up to £155,892 totalling 74% of eligible costs.  This grant is subject
to the formal acceptance of the CAT by HGC by 12 September 2025.   
5.9. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:  
Funder Stage Value
Kype Muir Community Fund To be confirmed £30,000
The Orit Cumberhead Community Fund To be confirmed £25,000
SLC Renewable Energy Fund Grant
(74%) Gallawhistle
For approval £155,892
Total project value   £210,892 
181

Page 182

5.10. The purchase of equipment is scheduled to commence in September 2025 and be
complete by January 2026. Officers will work with the applicant to monitor progress
and any impact on the timescales and allow officers to confirm Kype Muir Community
Fund and The Orit Cumberhead Community Fund have been secured.   
6. Employee Implications
6.1. There are no employee implications arising from this report. 
7. Financial Implications
7.1. The awards will come from Gallawhistle Windfarm which contributes to the Renewable
Energy Fund. The Funds have sufficient resources to meet the proposed grant awards
commitment detailed in this report. 
7.2. REF funding awards are subject to all other funding being secured. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Both projects support local communities and the local environment. The grant to
Douglas Community Development Company will prepare a feasibility with a financial
funding package and detailed architectural plan for the restoration of two derelict
building in the Douglas area. The grant to Hollandbush Golf Course will allow the club
and community to take on the long-term management and maintenance of the golf
course ensuring its community use and financial sustainability. 
9. Other Implications
9.1. The risks associated with the projects are focused on the potential for cost overruns,
delays to the projects or match funding not being secured. Work will continue with the
applicants to help ensure match funding is secured and that projects are delivered
broadly on time and within budget. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
10.2. Community Consultation is a requirement for all REF grants, consultation can be
referenced through community action plans, independent consultation and social
media platforms.   
David Booth 
Executive Director (Community and Enterprise Resources) 
23 July 2025 
182

Page 183

Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships     
Previous References
 Community and Enterprise Resources Committee 6 February 2024 Renewable Energy
Fund - Strengthening Links to Rural Priorities
 Housing and Technical Resources Committee 26 February 2025 - Hollandbush Golf
Course and Clubhouse, Lesmahagow – Community Asset Transfer to Hollandbush Golf
Club 
List of Background Papers
 Completed REF Appraisal Scoring Sheet for application number 1302
 Completed REF Grant Application Form for application number 1302
 Completed REF Appraisal Scoring Sheet for application number 1355
 Completed REF Grant Application Form for application number 1355 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Colin McFarlane, Project Development Officer
Enterprise and Sustainable Development Services
E-mail: -  colin.mcfarlane@southlanarkshire.gov.uk 
183

Page 184

184

Page 185

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Overtoun Bandstand Restoration 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise Committee of the restoration of Overtoun Bandstand in Overtoun Park,
Rutherglen
 detail the project programme, work to-date, expected completion and link to the
Rutherglen 900 Committee celebrations
 provide an update on the live community consultation exercise
 provide details of the Historic Environment Scotland (HES) external funding bid
opportunity 
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[ 
(1) that the Council’s commitment to restoring Overtoun Bandstand following wilful
fire damage in June 2024, be noted;
(2) that the project aim of delivering the bandstand in line with the Rutherglen 900
event calendar be noted;
(3) that the aims of the community consultation be noted; and
(4) that the timeline and application criteria for external funding from Historic
Environment Scotland be noted. 
3. Background
3.1. The bandstand in Overton Park Rutherglen, erected in 1914, is a cherished B-listed
structure and a landmark that has graced the community for over a century.
3.2. On 1 June 2024, the structure sustained significant damage as a result of a fire. The
Council acted swiftly to ensure public safety and to assess the extent of the damage.
Heras fencing and enhanced security measures were put in place immediately.
3.3. In February 2025, an allocation of £300,000 from the Council Budget was approved
for the repair and restoration of the bandstand in time for the Royal Burgh’s 900th
anniversary celebrations in 2026. Due to the bandstand’s historic significance, it is a
requirement that great care is taken to ensure its original character and features are
preserved during restoration. The Council will work closely with heritage experts and
conservation specialists to guide the repair process, with detailed assessments
being carried out to identify and retain all historically significant elements. 
17
185

Page 186

3.4. In addition, it is hoped the restoration will sympathetically incorporate modern
enhancements including power, lighting, and CCTV to support community use while
ensuring these additions do not compromise the bandstand’s architectural integrity.
To achieve this, additional investment will be essential not only to protect and
preserve the bandstand’s heritage, but also to realise the community’s aspirations for
a revitalised and sustainable landmark (please refer to paragraph 7.2 below). 
4. Project Progress, Timeline and Rutherglen 900 Celebrations
4.1. Following the fire in June 2024, the Council took immediate steps to safeguard the
site and assess the condition of the historic structure. The Council engaged with a
range of heritage and construction specialists to inform the response and ensure all
actions aligned with conservation best practice. 
Page\Park – Architects
4.2. An award-winning architectural practice known for its commitment to the reuse of
buildings and the regeneration of existing places; Page\Park was commissioned by
the Council to produce a detailed Conservation Report. This report:
 assessed the condition of the bandstand’s historic fabric to determine what
elements could be salvaged
 provided recommendations for restoration, and guidance on conditions required
for safe storage of materials
 included a proposed methodology for the careful dismantling of the structure,
which was shared with Historic Environment Scotland 
Reigart Construction Ltd – Construction
4.3. Reigart Construction was appointed to secure and protect the site. Their work
included stabilisation, fencing, and site safety measures to prevent further damage
and protect the public. 
Narro– Structural Engineering
4.4. Narro, structural engineers with experience in historic buildings, were instructed by
the Council to carry out a condition assessment. Their initial inspection report, dated
4 June 2024, confirmed the structure was unsafe and recommended it be carefully
dismantled for safety and preservation. 
4.5. Following the initial stages of inspection, refurbishment proposals and a method
statement for the remedial works, is currently being prepared which will be subject to
tender in due course. 
4.6. The estimated completion date for the restoration works is Spring 2026, however,
this date could be impacted by external funding timescales, which could delay
completion to Summer 2026. 
4.7.  In 2026, Rutherglen will be celebrating 900 years since becoming a Royal Burgh with
a full year of community-led events.  The intention is for the newly restored
bandstand to feature as part of the calendar of events. 
5. Community Consultation
5.1. Community consultation was launched in June 2025 and is still currently active. The
survey seeks views from the local community on the restoration, and future use of
the bandstand. 
186

Page 187

5.2. The survey is available through a QR Code and paper version, which can be left at
designated collection points.  This has been promoted through:- 
 Grow 73 ‘Buzz Fest’ – 8 June 2025
 Rutherglen Landemer Day – 14 June 2025
 Overtoun Park Bowling Club
 Rutherglen Town Hall (designated collection point)
 Rutherglen Library (designated collection point)
 Rutherglen 900 Steering Group
 Landemer Committee 
5.3. Evidence from the responses to-date suggests there is strong local support for
returning the bandstand to active use. Residents, local schools, heritage groups, and
voluntary organisations have all voiced a desire to see the structure reanimated as a
venue for performances, music, storytelling, public talks, and informal events. The
bandstand’s open, central location makes it ideally suited for inclusive outdoor
programming that brings people together in a shared public space. 
5.4. The outcomes from the survey will be published and promoted through the above-
mentioned venues and will be used to shape the project delivery. 
6. Employee Implications
6.1. There are no employee implications as a result of the contents of this report. 
7. Financial Implications
7.1. Whilst the Council has committed £300,000 toward the project, due to the scale of
damage, specialist materials, conservation expertise, and the inclusion of modern
safety features, the total costs are expected to exceed the budgeted amount.
Additional funding will, therefore, be necessary to deliver a project that meets both
conservation standards and community expectations. 
7.2. It is the Council’s intention to apply for external funding from Historical Environment
Scotland through their Grants Programme. An Expression of Interest (EOI) is
currently being prepared, for a grant award up to £100,000. 
7.3. In the event of a positive response to the EOI, a full application will be submitted in
line with HES timescales. As indicated previously, this may impact on the overall
project timescales. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The project aligns with sustainable heritage principles by prioritising the repair and
reuse of an existing historic asset over demolition or new build. This conserves
embodied carbon and minimises waste, while energy-efficient lighting and security
upgrades will be installed as part of the works. By enhancing access to a valuable
outdoor cultural space, the project also encourages active travel, reduces the need
for car-based trips to distant venues, and supports climate-friendly patterns of
community engagement. 
9. Other Implications
9.1. The restoration of the bandstand aligns the Council’s vision to ‘improve the lives and
prospects of everyone in South Lanarkshire’.
187

Page 188

10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, therefore, no Integrated
Assessment is required. 
10.2. Community consultation is ongoing as outlined in section 5.   
David Booth
Executive Director (Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Elaine Melrose (Development Officer)
E-mail:  elaine.melrose@southlanarkshire.gov.uk  
188

Page 189

Report
Agenda Item 
Report to: Community and Enterprise Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Clyde Metro Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update to highlight the progress made to develop the Clyde Metro Case
for Investment (CFI) programme by the Project Partners 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the progress of the Clyde Metro Case for Investment programme and the
contents of this report be noted. 
3. Background
3.1. The delivery of Clyde Metro is a collaborative project. The Case for Investment (CFI)
for Clyde Metro is being led by Strathclyde Partnership for Transport (SPT) as lead
partner, with support from Glasgow City Council, acting as a representative for the
Glasgow City Region (GCR). Transport Scotland is acting in a Project Assurance role.
Senior Officers from South Lanarkshire Council, including the Head of Service for
Roads, Transportation and Fleet Services, are actively engaged in the Clyde Metro
Senior Officers Group. This is to ensure that South Lanarkshire Council influences the
development of the project and remains informed on progress. 
3.2. The CFI will develop the programme-level business case for Clyde Metro and, as such,
is an essential first step towards setting out the programme of projects which will make
up the mass transit project over the years to come. 
3.3. With the scope of the Glasgow Airport Access Project now incorporated within a wider
regional metro opportunity, in December 2023 the GCR Chief Executives Group under
its delegated authority from GCR Cabinet, approved the allocation of £12.155m
business case funds from the GCR City Deal to Glasgow City Council as the lead GCR
local authority to support the CFI development. The Scottish and UK Governments are
each contributing 50% to the GCR City Deal funding package. 
3.4. Up to £6.5m of this allocation is available to SPT to support the delivery of CFI outputs,
with a grant agreement in place between Glasgow City Council and SPT. The
remaining £5.655m is available to Glasgow City Council to support GCR local authority
resource and spend profile developed in line with the CFI programme. A funding
strategy for subsequent stages of Clyde Metro will be identified through the CFI
process and this will include funding requirements and options for the detailed design,
business case and construction for a first phase. 
18
189

Page 190

3.5. The CFI comprises the following work packages: 
 CFI Stage 1a - Case for Change and Initial Option Development 
 CFI Stage 1b – Client Advisory Services 
 Clyde Metro Framework 
 CFI Stage 2 – Programme Business Case 
3.6. The CFI process will be informed by a range of workstreams including a Scottish
Transport Appraisal Guidance (STAG) based appraisal, business case development,
technical assessments, audit, assurance, statutory impact - 18 - assessments as well
as engagement and consultation with the public and key stakeholders. The CFI
process will then enable informed decisions to be made around route selection,
phasing, funding, and implementation arrangements, as well as the range of
transformational benefits that would be delivered. The CFI will be developed in a
manner consistent with STAG, and the five-case model for business cases defined in
HM Treasury’s Green Book. This approach is a compulsory pre-requisite in seeking
any Government grant funding support. 
3.7. As lead local authority for GCR for Clyde Metro, Glasgow City Council is responsible
for holding and disbursing funds to support the CFI programme, including entering into
agreements with SPT given its lead role and as the procuring organisation. In
recognition of GCR’s role as funder of CFI development, Glasgow City Council
provides regular progress reports through the GCR Project Management Office (PMO)
structures on the timetable for development, and monitoring progress of activity and
spend in line with City Deal programme requirements. SPT have also presented
progress reports to the GCR Cabinet on 5 November 2024 and 27 May 2025 and
published papers/reports outlining their approvals for procurement awards. SPT have
also provided regular progress updates to their relevant committees. 
4. Progress update
4.1. SPT appointed Mott MacDonald Ltd in February 2024 to support delivery of CFI Stage
1a. This work package included several workstreams as outlined below: 
4.2. Case for Change 
The Case for Change is one of the first steps within the wider CFI process - it being a
key component of the Strategic Case of the Programme Business Case. In summary,
the Case for Change Report provides a narrative of: 
 Challenges that Glasgow City Region is currently experiencing. 
 Opportunities available to deliver better economic, environmental, and social
outcomes in the future. 
 ‘Vision’ for a transformed future, with the Clyde Metro programme integrated into
a wider portfolio of complementary investment to deliver on national, regional,
local, and hyperlocal priorities.
 ‘Golden Thread’ for the programme, and how transformational changes in
connectivity and land use will address the current challenges and unlock the
opportunities for the future. 
4.3. It should be highlighted that the Case for Change built on the extensive evidence base,
and rationale previously established through the second Strategic Transport Project
Review (STPR2) published in December 2022 - while updating and
regionalising/localising content as appropriate. 
190

Page 191

4.4.  Based on the wider policy context, collaboration between key stakeholders, and with
reference to evidence documented within the report, a vision for the Clyde Metro
programme was created, as shown in Figure 1 below: 
Figure 1: Clyde Metro Vision 
4.5. The Case for Change Report was completed in August 2024 and is available on SPT’s
Clyde Metro microsite under the Key Documents section. The microsite provides key
information on the project and is where future updates will be made available. The
dedicated microsite also includes details of how to contact the project team. 
4.6. Network Options Development 
A draft Network Options Report was presented to the Clyde Metro Programme
Steering Group (PSG) in December 2024. The PSG is the key decision-making group
for the Clyde Metro CFI stage, comprises of the Chief Executives of the partner
organisations – SPT, Glasgow City Council and Transport Scotland. Approval was
granted by the PSG to start a period of stakeholder engagement during December
2024 - February 2025. 
4.7. Prior to its presentation to the PSG in December 2024, the draft Network Options
Report had been informed by early input from technical stakeholders including
Network Rail, ScotRail, bus operators and councils. Councils were also substantially
engaged through the Clyde Metro Senior Officers Group in relation to the methodology
adopted, datasets used and the emerging corridor analysis and network options. Ten
stakeholder awareness workshops were held throughout Autumn 2024 to ensure there
were no “showstoppers” or key missed items within the initial report. 
4.8. The Network Options Report builds on the analysis from the Case for Change and
outlines an approach to define key transport corridors across the City Region. The
corridors were then assembled into various network configurations which seek to
improve connectivity and integration across identified key priority places and local
communities, whilst addressing the regional ambition as set out in the Vision, and
Transport and Transformational Objectives. The definition of detailed routes and
191

Page 192

alignments, including proposals for stop locations will be developed as part of CFI
stage 2. 
4.9. Following the incorporation of stakeholder comments, the draft Network Options
Report was presented to the PSG, who approved progressing to a formal engagement
exercise on the Vision, Objectives and Network Options (VOO). This engagement
feedback will be used to guide and inform subsequent stages of the CFI. VOO
engagement was conducted during January and February 2025. 
4.10. VOO engagement activities included sessions with council leaders, councillors, SPT
members, MPs and MSPs, Community Planning Partnerships, and wider stakeholders
from across the West of Scotland, including the business community. More than 180
individual stakeholders were engaged across thirteen separate sessions. This
engagement included South Lanarkshire Council. 
4.11. Engagement demonstrated that there was widespread support for the scale and
ambition of Clyde Metro, with stakeholders recognising the need for a modern mass
transit system serving Glasgow City Region. Several key themes emerged during the
VOO engagement. These included questions and feedback around Clyde Metro’s
evidence base and future intelligence, how the network would be developed, its
connection with Glasgow Airport, methods for future funding and delivery, the
requirement for the project to have widespread support and advocacy, the importance
of integration with other transport modes, and the need for smart ticketing. The detailed
feedback from technical stakeholders including local authorities and the formal VOO
engagement has been made available to consultants as part of CFI Stage 2 works,
with an initial ask of them to review the work undertaken so far and ensure stakeholder
feedback is fully considered as part of developing plans for the next phase. 
4.12. The Network Options Report was approved at the March 2025 meeting of the Clyde
Metro PSG. This concluded the formal completion of CFI Stage 1a, allowing approval
for the project to move forward onto CFI Stage 2. 
4.13. To highlight the significant progress made so far, SPT have published a ‘CFI Stage 1
Close Out’ Communication Note which provides a succinct summary of all tasks and
outputs from VOO engagement. The note also includes a summary of the Vision,
Objectives and Network Options developed, and details of the feedback themes
identified by stakeholders. 
4.14. Client Advisory Services (CAS) 
Consultant’s Turner and Townsend were appointed by SPT in May 2024 to support
delivery of CFI Stage 1b - Client Advisory Services (CAS). This workstream provides
guidance and advice to the project team to help shape delivery requirements for CFI
Stage 2 and early preparation for future stages. Key tasks included: 
 Organisational Design: Supporting delivery of the initial CFI stage, including
recommendations of potential programme organisational and programme
governance structures for CFI stage 2 and beyond.
 Programme Definition and Requirements: Developing a CFI Programme Plan and
road map and providing advice on the optimal integration of transport and
transformation within the CFI – taking cognisance of policies and projects that
Clyde Metro maybe interact with, such as public transport operations investment
and improvements, and more widely health initiatives, sustainability, regeneration
and housing development. 
192

Page 193

 Development of a long-term Communications and Advocacy Strategy: Identifying
strategic, political, non-technical, commercial, innovative, and institutional
stakeholders, and establishment of a communications approach, to inform the
future engagement plan. 
4.15. Outputs from CFI Stage 1b, along with the recommendations from the CFI Stage 2
Readiness Review detailed below, will now form a workstream to be progressed by
the Clyde Metro project team. 
5. CFI Stage 2 and Next Steps
5.1. CFI Stage 2 
While CFI Stage 1 established the strategic need for Clyde Metro, Stage 2 will provide
a rigorous, more detailed investigation, following principles and requirements set out
by STAG and HM Treasury. CFI Stage 2 will run for two years and is comprised of
several workstreams and inter-related tasks to support long term infrastructure
planning and development, including: 
 Detailed scheme and technical appraisal
 Development of a Programme Level Business Case
 Land Use and Housing Assessments
 Engineering Feasibility
 Impact Assessments including 
o Equality Impact Assessment 
o Health Impact Assessment
o Child Rights and Wellbeing Impact Assessment
o Fairer Scotland Duty Impact Assessment
o Business and Regulatory Impact Assessment 
 Approaches to Governance
 Financing
 Technology
 Transformation Strategy and Action Plan 
5.2. CFI Stage 2 Readiness Review 
To ensure a strong base from which to commence and deliver CFI Stage 2, a
Readiness Review was undertaken between January and March 2025. 
5.3. The review assessed CFI partners and wider GCR teams’ readiness for CFI Stage 2
delivery. The readiness assessment built upon knowledge and experiences learned
from CFI Stage 1 and ongoing risk management. It also considered relevant
recommendations from the Hardie Review (Edinburgh Trams Inquiry), and measures
that could support delivery of the CFI, particularly around governance structures and
reporting arrangements. 
5.4. The Readiness Review validated that significant progress on project set-up and
monitoring arrangements has been made, giving confidence in the methodology
adopted. The outcomes of the Readiness Review were presented to the March 2025
PSG as part of the approval process for moving to CFI Stage 2, and the actions arising
from it, alongside those from CFI Stage 1b, to be taken forward as a specific
workstream by the project team. 
5.5. CFI Stage 2 Delivery 
Preparations for delivering CFI Stage 2 have progressed in parallel and at pace over
the past six months. Detailed scopes have been developed and procured for five
workstreams, with a further three workstreams set to undergo the same process in line
with the programme requirements. A summary is provided below:
193

Page 194

5.6. Programme Management activities have commenced for the five workstreams marked
with a (*). These activities are supported by wider oversight from the Project
Management Team and existing governance arrangements. 
5.7. The deliverables are expected to be completed by the end of 2025. This will signal the
beginning of approximately seventy outputs across the CFI Stage 2 workstreams,
which are set to be delivered over the next two years. The overall CFI remains on
target to be complete by early 2027. Some initial key deliverables include: 
Deliverable  Workstream  Delivery date
Vision, Objectives and
Options Note
CFI Stage 2A Complete
Governance Report CFI Stage 2A Mid December
2025
Delivery Mechanisms
Report
CFI Stage 2A Mid November
2025
Preliminary Options
Appraisal Report
CFI Stage 2A Mid December
2025
Workstream  Status  Consultant  Start Date End Date
Stage 2A:
STAG
Appraisal*
Awarded: SPT
Partnership
Committee
March 2025
Mott
MacDonald
March 2025 August 2026
Stage 2B:
Strategic
Environment
Assessment
and Habitats
Regulations
Appraisal*
Awarded Arup March 2025 February 2027
Stage 2C:
Impact
Assessments*
Awarded Jacobs March 2025 February 2027
Stage 2D:
Programme
Business Case
Currently in
procurement
process
Subject to
procurement
processes
June 2025 February 2027
Stage 2E:
Programme
Business Case
Audit
Tender Period:
Summer 25
Subject to
procurement
processes
October 2025 February 2027
Stage 2F:
Preliminary
Engineering
Statement*
Awarded: SPT
Partnership
Committee
March 2025
Mott
MacDonald
March 2025 March 2026
Stage 2G:
Land Use and
Housing
Assessment*
Awarded Arup March 2025 November
2026
Stage 2H:
Transformation
Strategy and
Framework
Tender Period:
Winter 26/27
Subject to
procurement
processes
Early 2027 Early 2027
194

Page 195

Strategic Case CFI Stage 2D Late-November
2025 
5.8. Stakeholder Engagement 
A Stakeholder Engagement and Consultation Strategy was developed by SPT to
inform the delivery of activities during CFI Stage 1. This strategy is being updated to
reflect the requirements of CFI Stage 2, with its contents being presented to the June
2025 Clyde Metro PSG. 
5.9. Activities will continue to be predominantly focused upon Technical Experts and
Statutory Services Stakeholders, with the strategy acting as a framework to guide
periods of engagement throughout the delivery of CFI Stage 2. This approach will be
based around specific ‘Engagement Windows’ to ensure a co-ordinated approach to
the delivery of engagement across the various workstreams. This will help to prevent
stakeholder fatigue and duplication of work. The STAG findings consultation window
planned for Spring – Summer 2026 will incorporate a public consultation activity.
These structures will also help inform and develop further, a co-ordinated approach to
wider communications and advocacy for the overall Clyde Metro programme. 
Figure 2: CFI Stage 2 Engagement and Consultation 
5.10. Senior officers from Roads, Transportation and Fleet Services will continue to be
active in the Clyde Metro Senior Officers Group. The overriding aim is to ensure that
a balanced approach is taken and that all transport modes are considered along the
identified corridors and that businesses and our communities are not adversely
impacted. However, it should be remembered that this is an ambitious project, with
complex technical challenges in terms of delivery along whatever corridors are
ultimately taken forward. Senior officers have already provided feedback to emphasise
195

Page 196

that local priorities and geographical differences across South Lanarkshire and the
region should be recognised and addressed in the development of the project. 
5.11. The Clyde Metro Senior Officers Group has proven to be an especially useful forum to
discuss key issues with councils in relation to the Clyde Metro development process,
therein building confidence, trust and clarity and a strong basis for future joint working
on this flagship regional project. SPT will continue to progress the Clyde Metro
programme from a regional perspective, including co-ordination with wider
workstreams including the Strathclyde Regional Bus Strategy (SRBS). Glasgow City
Council continues to work closely with SPT, on behalf of the GCR, to progress all
deliverables ensuring the Clyde Metro Senior Officers Group is effectively engaged. 
This will ensure a strong co-ordinated regional voice and involvement to input to,
validate, and review key emerging outputs. 
6. Employee Implications
6.1. Existing staffing levels will continue to be used in further engagement with the Project
Partners. 
7. Financial Implications
7.1. £12.155m funding delegated to Glasgow City Council from GCR City Deal to hold and
disburse funds to support the development of the Clyde Metro business case. Ongoing
financial and activity reporting to Clyde Metro Programme Steering Group and GCR
structures. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Through providing an alternative and more sustainable mode of transport, it is
expected that the project outcomes will have a positive impact in reducing carbon
emissions from transport. 
9. Other Implications
9.1. At present, there are no significant risks or other implications associated with this
report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. Relevant statutory impact assessments are being undertaken as part of the Clyde
Metro project. 
10.2. Consultation requirements as stated within section 5 or the report. 
David Booth
Executive Director ( Community and Enterprise Resources) 
04 August 2025 
Link(s) to Council Values/ Priorities/ Outcomes
 Focused on people and their needs
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
196

Page 197

Previous References
 None 
List of Background Papers
 SPT Clyde Metro website 
 Clyde Metro Case for Change Report 
 GCR Cabinet Reports: 5 November 2024 and 27 May 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Colin Park, Head of Roads, Transportation and Fleet Services
Ext: 4088
E-mail: Colin.Park@southlanarkshire.gov.uk 
197

Page 198

198

Page 199

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Strathclyde Regional Bus Strategy –
Recommendations for Future Delivery of the Regional
Bus Network Update 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the development of the Strathclyde Regional Bus Strategy
(SRBS)
 provide an overview of the Council’s recent response to the Strathclyde
Partnership for Transport (SPT) bus strategy consultation, which was based on
approvals given by the Executive Committee 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the response to the Strathclyde Partnership for Transport (SPT) bus strategy
consultation, submitted on 29 May 2025 and attached as Appendix 1, be noted. 
3. Background
3.1. A report to the Executive Committee on 8 May 2024 noted that in response to the
continuing decline in bus use and in recognition of the important role of bus in
delivering public policy, new provisions to improve bus services were introduced in
Scotland under the Transport (Scotland) Act 2019. The new provisions allowed Local
Transport Authorities, in accordance with relevant guidance and regulations, to
develop Bus Service Improvement Partnerships in partnership with bus operators, to
develop and manage a bus franchise, and establish a new municipal bus company to
directly operate bus services. 
3.2. The aforementioned Committee report also noted that in 2023, SPT commenced work
on the Strathclyde Regional Bus Strategy (SRBS). The SRBS is SPT’s process to
investigate the use of the provisions and to determine a preferred strategy to improving
the bus network in the region. 
3.3. The first stage of the development of the SRBS was a Case for Change report. This
report set out why change in the bus network in the Strathclyde area is required, setting
out current problems with the bus network, trends in passenger journeys, desired
outcomes of the SRBS, along with policies and associated objectives to improve the
bus network. 
19
199

Page 200

3.4. Following the Case for Change report, an Options Appraisal was undertaken to identify
options through which the bus network could be delivered. These options included
continuing with the current ‘business as usual’ approach, partnership models on a
voluntary or statutory basis, local services franchising, and municipal bus operations.
A consultation on the recommendations of the Options Appraisal was undertaken
between April to May 2024, with the Council response outlined in the 8 May 2024
Executive Committee Report. 
3.5. Following the response to the consultation, officers continued to liaise with SPT in the
development of the SRBS, with the Council response being taken cognisance of in the
draft SRBS. 
3.6. In February 2025, the SPT Strategy and Programmes Committee approved a draft
SRBS for public consultation. A copy of the draft SRBS is available here. 
4. Strathclyde Regional Bus Strategy Consultation
4.1. The draft SRBS is structured around three key chapters: the Case for Change (CFC),
the Bus Network We Need, and the SRBS Delivery Plan. 
4.2. The ‘Case for Change’ chapter builds on work done during the CFC stage in the SRBS
development process and concludes with the imperative to take the necessary action
to move away from a ‘cycle of decline’ to develop the potential of a holistically planned
bus network in Strathclyde.  The ‘Bus Network We Need’ chapter sets out a picture of
how bus could be delivered in the Strathclyde area to reverse the ‘cycle of decline’ and
meet wider social, economic and environmental aspirations. 
4.3. The Delivery Plan chapter sets out how the SRBS will be taken forward. SPT have
concluded that their recommended options for bus reform in Strathclyde are local
services franchising as the long-term ambition, with further consideration of small scale
supplementary municipal bus operations. The chapter includes the rationale for
progressing with the development of franchising, key issues to be considered in that
process, the “Franchising Route Map” identifying how it will be developed and
implemented, with an associated action plan. 
4.4. SPT commissioned SYSTRA, an independent transport consultancy, to consult with
stakeholders and the public on the draft SRBS. Views were sought upon each chapter,
with consultees asked predominantly by way tick box responses as to whether
consultees agreed or disagreed with policies and measures contained in the draft
SRBS. There were also opportunities for open ended responses on each chapter. 
4.5. In relation to the ‘Bus Network We Need’ chapter within the draft SRBS, we responded
that the policies and measures are generally supported, however, our response noted
that the detail and priorities must be reflective of local needs, in particular on rural
areas. Furthermore, our response stated that the proposed delivery through a
franchising model will require significant discussion between all parties particularly with
current bus operators and that taking this forward will be a challenge even with the
timescales outlined. 
4.6. In relation to the delivery plan chapter, consultees were asked if they supported or
opposed SPT taking forward bus franchising through the processes required by the
Transport (Scotland) Act 2019. As noted in the 8 May 2024 Executive Committee
Report, our response reiterated that the Council supports bus franchising being
progressed across the Strathclyde area. 
200

Page 201

4.7. The delivery plan notes that a future franchised network, will rely on sizeable public
funding, in that the options appraisal carried out in the development of the Draft
Strategy identified an indicative high-level estimate of £45m - £85m per annum
additional revenue subsidy to deliver a regional franchise of a transformational nature,
excluding fleet and depot scenarios. Our response noted that support is predicated on
there being a clear and fully funded delivery model that does not put additional
pressure on or divert funding from existing Council or SPT priorities. 
4.8. Based upon our approved response outlined in the 8 May 2024 Executive Committee
Report, our response to the latest consultation on the draft SRBS notes that further
work is required in relation to the governance structure, franchising model and the
development of the implementation strategy. In particular, we noted that there should
be a focus to ensure that the model is democratically accountable, and that local
democracy must remain with councils to ensure full consideration of geographical
differences (e.g. rural areas), local priorities and to ensure a balanced approach to the
needs of all sectors of our businesses and communities. Our response noted that this
is vitally important when developing supporting bus related infrastructure and / or when
cross boundary initiatives are being developed. Furthermore, we noted that such
infrastructure development and initiatives can be equally successful using existing
statutory powers and duties, strong professional partner relationships and political
support across councils and SPT. 
4.9. Our response also highlighted that other key issues to be considered include local
democratic accountability, cross boundary planning and meeting the needs of rural
areas where there is little or no current service.   
4.10. The draft SRBS lists a number of key risks for the ‘franchising route map’ when
developing and implementing franchising. These included: 
 political and partnership support and leadership
 requirement for a strong governance framework
 funding
 resourcing
 market uncertainty
 untested legislation 
4.11. The consultation asked for comments on these risks and whether there are any other
key risks. Our response noted that there are significant financial risks that are referred
to in the draft SRBS and more detail should be provided on these in the key risks
section. 
4.12. In our response, we highlighted that it is appreciated that more work is required to
address each of these risks, but that the governance risks should be elaborated upon
in the Draft Strategy to reference that the governance framework should ensure
representation from local authorities and democratic accountability of the governance
model that is ultimately taken forward. Our response noted that there are operational
risks over skills and capacity of SPT and local authorities that need to be reflected in
Franchising Route Map and ultimately in the development of the governance
framework. 
201

Page 202

4.13. Our response also noted that continuing engagement and partnership working with
Councils as highlighted in the Draft SRBS is welcomed to ensure that the needs of
South Lanarkshire’s communities are met. There remain significant unknowns in
relation to the development of the franchising model reflected in the key risks noted in
the Draft Strategy. Our response reiterated that it is essential that the Council remains
engaged with SPT going forward to contribute to and influence this process. 
5. Next Steps
5.1. We understand that SPT will present the final SRBS to a Partnership meeting in
September 2025. 
6. Employee Implications
6.1. Existing staffing levels will continue to be used in further discussion/assistance
provided to SPT in the development of the strategy. It should be noted that a future
franchising model may require additional staff resources.   
7. Financial Implications
7.1. Whilst there are no immediate financial implications, paragraph 4.7 of this report notes
that that the options appraisal carried out in the development of the draft SRBS
identified an indicative high-level estimate of £45m - £85m per annum additional
revenue subsidy to deliver a regional franchise of a transformational nature, excluding
fleet and depot scenarios. 
8. Climate Change, Sustainability and Environmental Implications
8.1. Increases in bus patronage has the potential to reduce reliance on private vehicles.
This supports South Lanarkshire’s Sustainable Development and Climate Change
Strategy. 
9. Other Implications
9.1.  There are no significant risks or other implications associated with this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
or consultation required. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/ Priorities/ Outcomes
 Focused on people and their needs
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible 
202

Page 203

Previous References
 Strathclyde Regional Bus Strategy – Recommendations for Future Delivery of the Regional Bus
Network – Executive Committee, 08 May 2024 
List of Background Papers
 Strathclyde Regional Bus Strategy – Draft for Consultation 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Stuart Laird, Engineering Manager
Via MS Teams
E-mail:  Stuart.Laird@southlanarkshire.gov.uk
203

Page 204

204

Page 205

Strathclyde Regional Bus Strategy Consultation
Purpose of this research
Bus services are vital to our communities, connecting towns, villages and city neighbourhoods
across the west of Scotland. Despite the significant value of bus to society, economy and the
environment, the bus network has been experiencing a decline. 
Strathclyde Partnership for Transport (SPT) wants to reverse this cycle of decline and grow
the bus network. This means a bus network that attracts more people to buses and ensures
access for communities who rely on buses for every day travel needs. This also means a bus
network for everyone. 
To achieve this, SPT has been developing a Strathclyde Regional Bus Strategy that sets
out what is needed from buses in the future and how this may be delivered. The draft
Strathclyde Regional Bus Strategy can be accessed from SPT’s website:
https://www.spt.co.uk/about-us/what-we-are-doing/regional-transport-strategy/bus-strategy/
This survey will help SPT understand views on key elements of the draft strategy and consider
if any changes are required prior to the SPT Partnership approving the strategy for delivery. 
This survey
Throughout this survey, we will refer to the draft Strathclyde Regional Bus Strategy as ‘the
bus strategy’. 
It is important that the bus strategy meets the needs of people, businesses and organisations
of the west of Scotland. SPT is holding this consultation so they can hear your views on the
bus strategy and supporting documents.
SPT has commissioned SYSTRA, an independent transport consultancy, to consult with
stakeholders and the general public on the bus strategy. Your views are important and will be
gratefully received. This survey should take approximately 10-15 minutes to complete,
depending on the answers you give. All feedback received will be considered and will help to
develop the final version of the bus strategy. You are able to provide a response to the survey
from now until Thursday 29th May 2025.  
If you require any support in completing this survey, please contact SPT at RTS@spt.co.uk. 
Your data
All survey responses are confidential and results will be analysed and reported anonymously
by SYSTRA. The research complies with the Market Research Society Professional Code of
Conduct and General Data Protection Regulation (GDPR).  You can withdraw from the
research at any time.
The survey will ask you for some basic contact information for the purposes of ensuring the
authenticity of responses, as well as asking for your feedback on the bus strategy. Those
responding on behalf of an organisation will also be asked to provide some basic details about
their organisation. Those responding as an individual will be asked about the area they live in
and their current travel behaviour. 
19
205

Page 206

To develop a bus strategy that truly reflects the needs and preferences of the community, it is
crucial that each participant provides honest and unique responses. Your feedback is
invaluable in shaping a bus network that serves everyone effectively. We kindly ask that you
complete the survey only once to ensure the integrity of the results.
You have rights in relation to how your personal data is handled and you can find full details
by clicking https://www.systra.com/uk/wp-content/uploads/sites/11/2025/02/spt-srbs-privacy-
notice.pdf.
Are you happy to proceed with the survey? 
Please select one
x Yes 
No 
ABOUT YOU
These first few questions are to understand a little bit more about your organisation. 
1. What is the name of the organisation that you are responding on behalf of? 
Please enter your organisation’s name below
South Lanarkshire Council 
2. Which of the following best describes your organisation? 
Bus operator
X Local authority 
Other organisation 
3. In which local authority area does your organisation primarily operate? 
Argyll and Bute 
East Ayrshire 
East Dunbartonshire 
East Renfrewshire 
Glasgow City 
Inverclyde 
North Ayrshire 
North Lanarkshire 
Renfrewshire 
South Ayrshire
X South Lanarkshire 
West Dunbartonshire 
Other – please specify: 
206

Page 207

4. Please provide your name, job title, and email address below. Note, this
information is being requested for the purposes of ensuring the authenticity of
responses. A list of all organisations that respond to the consultation will also
be included in reporting, but will not be linked to responses. Your details will not
be used for any other purpose.   
Name: Jonathan Plant  
Job title: Team Leader Traffic and Transportation 
Email: Jonathan.plant@southlanarkshire.gov.uk 
5. Have you read the bus strategy? 
X Yes, I have read it in full 
Yes, I have read some of it 
No, I have not read it 
I was not aware of the bus strategy until now. 
6. In 2024, SPT carried out a consultation regarding recommendations from the
options appraisal. Did your organisation respond to this consultation? 
x Yes 
No 
Don’t know 
207

Page 208

YOUR VIEWS ON THE BUS NETWORK
7. Firstly, do you agree or disagree that the bus network meets the needs of the
general public? 
Strongly agree 
Slightly agree 
Neither agree nor disagree 
Slightly disagree
X Strongly disagree 
Don’t know 
Not applicable 
THE BUS NETWORK WE NEED
The bus strategy sets out policies and measures. The Policies are the principles that should
be applied by SPT and partners in decision-making processes affecting bus in the region,
while the Measures describe the activities and outputs that are needed to support the Policies.
In the bus strategy, these policies and measures are grouped under seven themes.  The
themes are set out below alongside brief explanatory text, with further details available in
chapter 4 of the draft bus strategy. 
208

Page 209

8. When thinking about the bus network and how it may be improved,  how
important or not is each theme to your organisation? 
Please select one for each theme 
Very
important
Important Neutral Unimportant Very
unimportant
Don’t
know
Buses where they
are needed, when
they are needed
X     
Reliable and
quicker bus
journeys
X     
Affordable and
attractive fares and
ticketing
X     
Accessible and
safer bus journeys
X     
A trusted and
recognisable bus
network
X     
A seamless and
integrated bus
network
X     
A more
environmentally
sustainable,
resilient and
adaptable bus
network and fleet
X      
209

Page 210

9. To what extent do you agree or disagree that each theme should be included
within the bus strategy? 
Please select one for each theme 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
Buses where they
are needed, when
they are needed
X     
Reliable and
quicker bus
journeys
X     
Affordable and
attractive fares and
ticketing
X     
Accessible and
safer bus journeys
X     
A trusted and
recognisable bus
network
X     
A seamless and
integrated bus
network
X     
A more
environmentally
sustainable,
resilient and
adaptable bus
network and fleet
X      
210

Page 211

The next few questions are optional. If you do not wish to provide feedback on the polices
and measures within the themes, please skip to question 19. 
10. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 1: Buses where they are needed,
when they are needed? 
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P1: Improve periods
of operation and
geographic
coverage of the bus
network, where
required
X     
P2: Improve the
frequency of bus
services, where
required
X     
P3: Improve the
efficiency of the
regional bus
network
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M1: A regional bus
network based upon
defined principles for
frequency, capacity ,
periods of operation,
coverage and
connectivity
X     
M2: Minimum levels
of service for all
towns, key
destinations (e.g.
hospitals) and off-
peak time periods to
ensure basic
accessibility,
working towards
more convenient
service levels
X     
211

Page 212

Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M3: High frequency
services (every 10
minutes minimum)
on core routes,
working towards a
turn-up-and-go
service level for
some services at
appropriate times
X     
M4: An integrated
bus network with
better coordination
between services
and modes,
particularly for
journeys where
interchange is more
common (e.g. rural
to regional express
or bus to rail)
X      
212

Page 213

11. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 2: Reliable and quicker bus
journeys? 
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P4: Improve the
reliability and
punctuality of bus
services
X     
P5: Improve the
attractiveness of
bus journey times
compared to car
journey times
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M5: Bus priority
infrastructure on
high frequency
routes (every 10
minutes minimum)
and routes that are
prone to congestion,
including motorways
X     
M6: Bus services
that better meet
performance (e.g.
punctuality and
patronage)
standards and
objectives,
supported by more
performance
monitoring and the
open sharing of
performance data
X     
M7: Better
coordination of rural
services with
region/express
services and rail
services
X     
213

Page 214

Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M8: Better co-
ordination of
appropriate fleets for
appropriate routes
and services,
maximising fleet and
boarding capacity
X     
M9: Support wider
car demand
management and
centralised network
disruption
management
policies, measures
and operations
x     
M10: Traffic
management and
enforcement
measures (e.g. bus
lane cameras,
parking
enforcement)
X     
M11: More efficient
network planning via
a whole of region
approach to provide
faster and more
reliable journeys
x     
M12: Network-wide
communication and
monitoring teams to
manage and
respond to
disruption, including
the development
with partners of a
regional control
centre
x     
M13: Faster bus
journey times on
busier routes,
supported by bus
priority, faster
boardings (through
smart ticketing, bus
stop rationalisation
and faster vehicle
access/egress) and
express services
X       
214

Page 215

12. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 3: Affordable and attractive fares and
ticketing?
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P6: Improve the
affordability of bus
fares, especially for
people living in
poverty,
disadvantaged
communities and
rural or remote
communities
X     
P7: Improve the
attractiveness of
bus fares compared
to the cost of
motoring
X     
P8: Ensure that bus
fares are easy to
understand and
flexible
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M14: Concessionary
/ discounted fares
prioritised for groups
most in need,
progressing towards
overall fare
reductions for all
X     
M15: Automatic fare
capping for single
and multi-journey
(ensuring best fare
is applied for the
actual journey
made)
X     
215

Page 216

Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M16: Simplified fare
structures providing
customers with the
best value for money
ticket for all 
journeys
X     
M17: Accessible and
easy to understand
fares information
X     
M18: Consistent and
well-communicated
approaches to any
fare increases
X      
216

Page 217

13. To what extent do you agree or disagree that the following policy and measures
are appropriate to deliver Theme 4: Accessible and safer bus journeys?
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P9: Improve the
accessibility and
safety of bus travel
for all passengers
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M19: Accessibility
and equality training
for bus drivers, bus
station staff and bus
planning teams
X     
M20: Inclusive and
accessible travel
information,
including audio-
visual information on
buses
X     
M21: Passenger
assistance services
on buses, aiming for
a single, network-
wide approach
X     
M22: Accessible
vehicles, bus stops
and bus stations,
and routes to bus
stops and stations
X     
M23: CCTV on
buses and at bus
stations
X     
M24: High quality,
well-lit and
maintained bus
stops
X      
217

Page 218

14. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 5: A trusted and recognisable bus
network
Please select one for each policy and measure within this theme
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P10: Develop a
consistent network
identity across the
region
X     
P11: Ensure
passengers receive
a consistent, high
quality standard of
customer service
across the region
X     
P12: Develop and
ensure a consistent
approach to bus
service changes
across the region
that minimises
disruption to
passengers
X     
P13: Develop and
ensure high quality
and consistent
driver standards
across the region
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M25: A strong
network-wide
identity across key
assets, services and
information (e.g.
vehicles, 
stops and stations,
online and app
services)
X     
M26: A network-
wide Customer
Charter
X     
218

Page 219

M27: Network-wide
passenger
engagement and
monitoring of
passenger
satisfaction
X     
M28: Restrict
significant service
changes to well-
defined dates each
year (like trains) with
a clearly reported
rationale for change
X     
M29: Consistent,
high quality
customer service
provided by drivers
and other customer-
facing 
staff (e.g. travel
centres, contact
centres, customer
services)
X      
219

Page 220

15. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 6: A seamless and integrated bus
network?
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P14: Develop a
smart and
integrated ticketing
system for the bus
network that makes
it easy to use bus
across the region
and supports wider
multi-modal
integration and
MaaS
X     
P15: Ensure bus
stops and
interchanges are
high quality and
located
conveniently and
efficiently across
the region
X     
P16: Ensure bus
travel information is
provided
consistently as high
quality, accurate
and integrated for
all bus users across
the region
X      
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M30: Smart and
cashless ticketing
options and simplified
product offer
X     
220

Page 221

Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M31: Bus integrated
more closely with
ferry, rail, Subway,
cross-regional routes
and the
emerging Clyde Metro
networks/services/hub,
ticketing and
information
X     
M32: High quality
passenger waiting
facilities
(stops/hubs/stations)
across the region
X     
M33: Integrate waiting
facilities with active,
accessibility and
micro-mobility modes,
and with
wider mobility hub and
place-making
proposals in
appropriate locations
X     
M34: Review, improve
and rationalise waiting
facility infrastructure
and locations to
provide a more
seamless, welcoming
and efficient network.
X     
M35: Accurate and
reliable real time travel
information across the
region
X     
M36: Open and
transparent
performance
monitoring of services
to assess performance
and target
improvements.
X      
221

Page 222

16. To what extent do you agree or disagree that the following policies and
measures are appropriate to deliver Theme 7: A more environmentally
sustainable, resilient and adaptable bus network and fleet?
Please select one for each policy and measure within this theme 
Policies 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
P17: Transition the
regional bus fleet to
zero emission
vehicles
X     
P18: Ensure high
quality and well-
maintained vehicles
across the region
X     
P19: Ensure the
regional bus fleet
supports a resilient
and operationally
efficient bus
network
X     
Measures 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
M37: High quality bus
fleet that is
transitioning fully to
100% zero emission
vehicles in line with
Scottish Government
targets
X     
M38: Efficient, resilient
and well-maintained
depot network
X     
M39: A road and bus
infrastructure network
that is resilient and
adaptable to the
effects of climate
change
X     
M40: Resilient and
skilled-up workforce X     
222

Page 223

M41: EV enabled bus
depot facilities and
supporting
infrastructure that are
future proofed to
facilitate the
conversion of the bus
fleet to zero emissions
X      
17. If you answered ‘slightly disagree’ or ‘strongly disagree’ to any of the choices in
Questions 10 – 16, and would like to provide a reason for this, please leave this
below noting the policy/measure number.   
223

Page 224

18. If you have any further comments on the chapter ‘The Bus Network We Need’
within the bus strategy, please leave these below.   
The bus network we need must meet the needs of South Lanarkshire’s communities and its
rural areas in particular, where there is little or no current service.  This should be reflected
more strongly in the measures that are currently included in relation to this Theme
highlighted on page 62 of the Draft Strategy.   
Although there is reference to Clyde Metro and integration with Rail, the public transport
provision of the future will require to consider strong links to these.  There is no doubt bus
provision will form a strong link to these however, this is not reflected or a high priority given
in the current draft. 
The need for better rural services as well as how buses can interchange effectively with the
proposed Clyde Metro project and the current Rail provision should come out stronger in
the strategy.  Looking at one mode of public transport without consideration of the other
modes will limit the effectiveness of what needs to be achieved when considering the wider
public transport provision.  A fully serviced and integrated public transport network with
seamless transitions needs to be a strong feature of this strategy. 
The proposed delivery through a franchising model will require significant discussion
between all parties particularly with current bus operators.  Taking this forward will be a
challenge even with the timescales outlined. 
There is recognition that the funding environment needed to take forward many of the
actions from the strategy will require to change with significant investment needed from
Transport Scotland amongst other contributors. Given the current funding challenges and
climate, the annual estimates provided in the strategy seem unrealistic at this time.  There
is therefore a risk to taking forward and achieving many of the actions identified in the
strategy.           
Finally, we are generally supportive of the policies and measures however, the detail and
priorities must be reflective of local needs. 
224

Page 225

225

Page 226

DELIVERY PLAN
To deliver the bus strategy, SPT is proposing to develop bus franchising for the region’s bus
network, following the requirements set out in the Transport (Scotland) Act 2019. 
The bus strategy provides an overview of bus franchising, sets out the rationale for pursuing
franchising, ‘key issues’ to be considered in the development of franchising and the processes
required to take forward the development of franchising.   
19. To what extent do you support or oppose SPT taking forward bus franchising
through the processes required by the Transport (Scotland) Act 2019?  
Please select one 
Strongly support
X Slightly support 
Neither support nor oppose 
Slightly oppose 
Strongly oppose 
Don’t know
20. Would you like to provide a reason for your response? This may include
presenting alternatives to SPT’s proposals (which for the avoidance of doubt,
may include making no changes to the way bus services are currently delivered).
If there is any information that you wish to provide in support of your views, please include
this in the text box below. If the space provided is not sufficient, or you would like to provide
further supporting material, please email this to rts@spt.co.uk   
The delivery plan notes that a future franchised network, will rely on sizeable public funding,
in that the options appraisal carried out in the development of the Draft Strategy identified
an indicative high-level estimate of £45m - £85m per annum additional revenue subsidy to
deliver a regional franchise of a transformational nature, excluding fleet and depot scenarios. 
As noted previously, South Lanarkshire Council support is predicated on there being a clear
and fully funded delivery model that does not put additional pressure on or divert funding
from existing Council or SPT priorities.   
Further work is required in relation to the governance structure, franchising model and the
development of the implementation strategy. In particular with a focus to ensure that the
model is democratically accountable, and that local democracy must remain with councils to
ensure full consideration of geographical differences (e.g. rural areas), local priorities and to
ensure a balanced approach to the needs of all sectors of our businesses and communities.
This is vitally important when developing supporting bus related infrastructure and / or when
cross boundary initiatives are being developed. Such infrastructure development and
initiatives can be equally successful using existing statutory powers and duties, strong
professional partner relationships and political support across councils and SPT. 
226

Page 227

21. The bus strategy lists a number of key issues for the development of bus
franchising.  To what extent do you agree or disagree that each of the following
is a ‘key issue’ to be considered?   
Please select one for each issue 
Strongly
agree
Slightly
agree
Neither
agree
nor
disagree
Slightly
disagree
Strongly
disagree
Don’t
know
Scale and pace of
change across the
region
X     
Fares and ticketing X     
Information and
customer service X     
Funding
environment  X     
Fleets and Depots X     
Staffing, support
services and
stakeholders
X     
Bus priority and
‘bus friendly
environment’
X      
22. Do you have any other comments on these ‘key issues’ or think there are any
other ‘key issues’ that should be considered by SPT in the development of bus
franchising?  If yes, please state these below: 
As noted above, key issues to be considered include local democratic accountability, cross
boundary planning and meeting the needs of rural areas where there is little or no current
service.   
227

Page 228

The bus strategy lists a number of key risks for the ‘franchising route map’ when developing
and implementing franchising. This includes:
⚫ Political and partnership support and leadership
⚫ Requirement for a strong governance framework
⚫ Funding 
⚫ Resourcing
⚫ Market uncertainty
⚫ Untested legislation 
23. Do you have any other comments on these ‘key risks’ or think there are any
other ‘key risks’ that should be considered by SPT in the development of
franchising? If yes, please state these below: 
There are significant financial risks that are referred to in the Draft Strategy and more
detail should be provided on these in the key risks section. 
We do appreciate that more work is required to address each of these risks, however, the
governance risks should be elaborated upon in the Draft Strategy to reference that the
governance framework should ensure representation from local authorities and
democratic accountability of the governance model that is ultimately taken forward.
There are operational risks over skills and capacity of SPT and local authorities that need
to be reflected in Franchising Route Map and ultimately in the development of the
governance framework. 
A draft Action Plan is included in the Delivery Plan, with actions arranged under 4 topics:
• Franchising Route Map - initial actions to progress the development of franchising;
• Pre-franchising period -  actions to support the management of the transition period
ahead of the implementation of any franchising scheme;
• Bus infrastructure and traffic management - actions to support delivery of bus
infrastructure (including bus priority) and traffic management measures.
• Bus friendly environment – actions related to wider transport policies, interventions
or programmes complementary to the bus strategy 
The next few questions are optional. The next series of questions give you the option to
provide feedback on the action plan. If you do not wish to provide comments, please skip to
question 25. 
228

Page 229

24. If you would like to provide feedback on the Action Plan, please leave this below.
Please also specify if your comments relate to the Action Plan as a whole or for
particular topics. 
As noted under each of the 4 topics, the continuing engagement and partnership working
with Councils is welcomed to ensure that the needs of South Lanarkshire’s communities are
met.  There remain significant unknowns in relation to the development of the franchising
model reflected in the key risks noted in the Draft Strategy. It is essential that the Council
remains engaged with SPT going forward to contribute to and influence this process. 
229

Page 230

25. Are there any other actions that SPT should consider?  
x No   
Yes – please state: 
None other than those referred to in previous comments. 
26. If you have any further feedback on Delivery Plan, please leave this below: 
230

Page 231

ACCOMPANYING DOCUMENTS 
The bus strategy has been assessed through Strategic Environment Assessment, Equality
Impact Assessment, Fairer Scotland Duty Impact Assessment, Island Communities Impact
Assessment and Child Rights and Wellbeing Impact Assessment.  The relevant documents
are available at: https://www.spt.co.uk/about-us/what-we-are-doing/regional-transport-
strategy/bus-strategy/ 
27. If you would like to provide feedback on any of these documents, please leave
this below: 
231

Page 232

232

Page 233

FINAL COMMENTS 
28. Finally, if you have any further comments related to the bus strategy, please
enter them here.   
The Scottish Government must support local authorities and transport authorities seeking
to replace deregulated bus models with models of regulation or common ownership, with
fair funding and regulation that respects the autonomy and democratic wishes of Scotland’s
communities and regions and that a democratically accountable Strathclyde-wide bus
franchise should be progressed to improve bus services across the region and realise the
ambitions of the Regional Transport Strategy. 
Thank you so much for your time. 
233

Page 234

Please return the completed questionnaire to rts@spt.co.uk or SPT 131 St. Vincent St,
Glasgow.
234

Page 235

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 12 August 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Notification of
Contracts Awarded - 10 October 2024 to 31 March 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification to Committee, in accordance with Standing Orders on
Contracts, of all contracts awarded by Community and Enterprise Resources
during the period 1 October 2024 to 31 March 2025
1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the details of the contracts awarded be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts that
details of the acceptance of all tenders above £50,000 be reported retrospectively to
the relevant Committee for noting, other than those under Clause 21.3 where the
award is not the lowest in a price only tender, or costs exceed the approved financial
provision.  In these instances a report is submitted to the appropriate Committee and
subsequent authority to award is granted by that Committee. 
4. Contract Awards
4.1. A full list of contracts awarded, and contracts extended during the period 1 October
2024 to 31 March 2025 on the basis of lowest offer and/or most economically
advantageous offer submitted, is provided at Appendix 1. 
5. Employee Implications
5.1. There are no employee implications arising from this report. 
6. Financial Implications
6.1. Appropriate budgetary provision is available for each of the contracts awarded. 
7. Climate Change, Sustainability and Environmental Implications
7.1 There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
8. Other Implications
8.1. There are no direct risks or implications for sustainability in terms of the information
contained in this report. 
20
235

Page 236

9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in terms of the information
contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 July 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Community and Enterprise Resources Committee 26 November 2024 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk 
236

Page 237

Appendix 1 
Community and Enterprise Resources 
Contracts Awarded over £50,000 in value 
Contractor CRN Value of Contract
Awarded
Date of
Award
Brief Description Contract
Period
Cromwell Polyethene Ltd SLC/CE/24/070 461,727.02 GBP 01/10/2024 Supply and Delivery of Refuse
Sacks
08/10/2024 -
07/10/2028
J&W Armstrong, George Hamilton, D&J
Harrison, Hyndford Plant Ltd, Johnstone
Agricultural Services Ltd, Kerr
Agricultural Services, JR Kerr, Alan
Kinloch TA Mathew Kinloch, DW Lyon
Agricultural Contractors Ltd, A Mitchell &
Co, WW & M Cuthbertson
SLC/CE/23/113 132,522.00 GBP 03/10/2024 Provision of Winter Assistance
(Snow Ploughing & Gritting)
01/10/2024 -
30/09/2029,
option to extend
until 29/09/2032
M Squared (Scotland) Ltd SLC/PS/COMENT/23/
019/6/012
80,337.33 GBP 03/10/2024 Works on Camnethan Street,
Stonehouse
14/10/2024 -
21/12/2024
Robert Potter and Partners Ltd SLC/CE/24/033 84,265.00 GBP 03/10/2024 Professional Services for
Cathcart Road Net Zero
21/10/2024 -
31/10/2025
Stantec Uk Ltd SLC/CE/24/003 219,314.00 GBP 03/10/2024 2024-25 - Principal Inspection of
Structures with Difficult Access
14/10/2024 -
14/03/2025
Turner & Townsend Project SLC/CE/24/035 614,622.74 GBP 28/10/2024 Project Management Team
Centre West
10/09/2024 -
31/08/2028
DMG Floorcare Ltd, Highland Industrial
Supplies Limited, Nilfisk Ltd, 
SLC/CE/24/029 320,000.00 GBP 28/10/2024 Supply and Delivery,
Maintenance and Repairs of
Cleaning Equipment
22/07/2024 -
21/07/2028
Econ Engineering Ltd SLC/CE/24/059 220,584.00 GBP 28/10/2024 Hire of 12, 18 and 26 Tonne
Gritters for Winter Maintenance
01/10/2024 -
01/04/2025
Voluntary Action South Lanarkshire SLC/CE/24/071 180,000.00 GBP 31/10/2024 Volunteering for Employability 01/04/2024 -
31/03/2025,
option to extend
until 31/03/2026
Rentokil Initial UK Ltd, Hey Girls CIC SLC/CE/24/051 1,935,129.00 GBP 04/11/2024 Provision and Delivery of
Washroom Solutions and
Sanitary Products  
11/11/2024 -
10/11/2028 
237

Page 238

Covanburn Contracts Ltd SLC/CE/24/026 295,295.45 GBP 04/11/2024 NEC3 Engineering and
Construction Short Contract for
Coalburn Recreation Area
Tennis Court Redevelopment
11/11/2024 -
27/01/2025
TD Tree & Land Services Ltd SLC/CE/24/078 87,870.00 GBP 13/11/2024 Tree Surgeon Works for Trees
affected by Ash Dieback Disease
18/11/2024 -
31/01/2025
Vivedia Limted SLC/CE/24/084 286,000.00 GBP 18/11/2024 Subscription of Crematorium AV
Equipment
18/11/2024 -
17/11/2029
W I & A Gilbert SLC/PS/COMENT/23/
019/4/021
58,895.03 GBP 26/11/2024 Elvanfoot Bridge Refurbishment 03/03/2025 -
28/03/2025
South Lanarkshire College SLC/CE/24/098 256,179.00 GBP 27/11/2024 Delivery of Foundation
Apprenticeships
27/08/2024 -
28/05/2026
New College Lanarkshire SLC/CE/24/099 80,000.00 GBP 27/11/2024 GradU8 Programme 26/08/2024 -
04/04/2025
South Lanarkshire College SLC/CE/24/100 80,000.00 GBP 27/11/2024 GradU8 Programme 26/08/2024 -
04/04/2025
Motus Commercials SLC/CE/24/108 594,860.00 GBP 28/11/2024 Direct Award for the supply and
delivery of Heavy Vehicles
02/12/2024 -
31/01/2025
Motus Commercials SLC/CE/24/120 360,350.00 GBP 27/12/2024 Direct Award for the supply and
delivery of Heavy Vehicles
27/12/2024 -
31/01/2025
Covanburn Contracts Ltd SLC/PS/COMENT/23/
019/6/009
99,445.91 GBP 15/01/2025 NEC3 Engineering and
Construction Short Contract for
Wooddean Park Wetland and
Path Infrastructure Works, Phase
2
03/03/2025 -
02/05/2025
SSI Schaffer Plastics UK Ltd SLC/CE/24/039 257,000.00 GBP 15/01/2025 Supply and Delivery of 2
Wheeled Bins
15/01/2025 -
14/07/2025
Storm Environmental Ltd SLC/CE/24/126 148,888.80 GBP 16/01/2025 Supply and Delivery of
Communal Recycling Bins
20/01/2025 -
31/01/2025
Storm Environmental Ltd SLC/CE/24/128 60,000.00 GBP 29/01/2025 Supply and Delivery of 1100 L &
1280 L - 4 Wheeled Bins
29/01/2025 -
08/12/2025
Broxap Ltd SLC/CE/24/079 65,800.00 GBP 03/02/2025 Mini Competition for The Supply
and Delivery of Litter Bins
06/02/2025 -
31/03/2025
Enva Organics Recycling Ltd SLC/CE/24/123 400,345.16 GBP 05/02/2025 The Receipt and Treatment of
Organic Waste - Lot 2.2a & & Lot
3.2
01/04/2025 -
31/03/2027
Motus Commercials SLC/CE/24/136 714,669.00 GBP 12/02/2025 Supply and delivery of Heavy
Vehicles
12/02/2025 -
30/05/2025
238

Page 239

Parks of Hamilton (Townhead Garage)
Ltd
SLC/CE/24/135 1,841,559.40 GBP 12/02/2025 Supply and Delivery of Light
Vehicles for the 2024 – 2025
financial year
12/02/2025 -
30/05/2025
Jobling Purser Ltd SLC/CE/24/132 80,891.60 GBP 19/02/2025 Supply and Delivery of Bitumen
Products
24/02/2025 -
23/02/2027,
option to extend
until 23/02/2029
Pulse Fitness Ltd SLC/CE/24/065/01 1,080,148.76 GBP 25/02/2025 Supply & delivery of SLLC
Fitness Equipment – Lot 1 Gym
Equipment Cardiovascular and
Resistance
28/02/2025 -
27/02/2030
Pulse Fitness Ltd SLC/CE/24/065/02 190,165.13 GBP 25/02/2025 Supply & delivery of SLLC
Fitness Equipment – Lot 2
Cycling
28/02/2025 -
27/02/2030
Pulse Fitness Ltd SLC/CE/24/065/03 76,194.07 GBP 25/02/2025 Supply & delivery of SLLC
Fitness Equipment – Lot 3 Free
Weights
28/02/2025 -
27/02/2030
Swarco Smart Charging Ltd SLC/CE/24/133 123,049.80 GBP 26/02/2025 Contactless Compliance Grant 28/02/2025 -
31/03/2025
A M Philip Trucktech Ltd SLC/CE/24/140 394,121.05 GBP 27/02/2025 Supply and delivery of Heavy
Vehicles
27/02/2025 -
30/05/2025
Marvetech Limited SLC/CE/24/046 408,000.00 GBP 27/02/2025 Hire, Service and Maintenance
of Electric Hot Boxes
01/04/2025 -
31/03/2035, ,
option to extend
until 31/03/2040
Certas Energy UK Ltd                               SLC/CE/24/103A 800,000.00 GBP 03/03/2025 Supply and Delivery of Liquid
Fuels
01/04/2025 -
31/03/2027
Highland Fuels Ltd SLC/CE/24/103B 5,200,000.00 GBP 03/03/2025 Supply and Delivery of Liquid
Fuels
01/04/2025 -
31/03/2027
Sportex Group Ltd SLC/CE/24/112 117,813.96 GBP 05/03/2025 NEC3 Engineering and
Construction Short Contract for
the Design and Construction of 1
x 3rd Generation Pitch at
McKirdy Park
01/05/2025 -
24/07/2025
Savills UK Ltd SLC/CE/24/131 95,000.00 GBP 06/03/2025 South Lanarkshire Data Centre
Site Analysis and Land Sale
14/03/2025 -
13/03/2026
Turner & Townsend Project SLC/CE/23/185 702,762.00 GBP 06/03/2025 Design and Delivery of the
Clydesdale Way Project
17/03/2025 -
23/07/2027
Routes to Work South SLC/CE/24/143 2,263,000.00 GBP 07/03/2025 2024/2025 employability services 01/04/2024 -
31/03/2025
239

Page 240

George Carruthers & Sons Ltd SLC/CE/24/085 4,773,744.75 GBP 07/03/2025 Supply and Delivery of Fresh
Fruit and Vegetables
01/04/2025 -
31/03/2028,
option to extend
until 31/03/2029
Turner & Townsend Project SLC/CE/24/145 193,700.00 GBP 14/03/2025 Country Parks Master Plan
Phase 1 (White Bridge & Pump
Track)
17/03/2025 -
16/03/2026
Lowmac Alloys Ltd                 SLC/CE/24/147 931,095.00 GBP 24/03/2025 Receipt and Processing of
Recyclate Waste - Container Mix
01/04/2025 -
31/03/2028,
option to extend
until 31/03/2030
IPL Plastics (UK) Ltd T/A IPL Hull SLC/CE/24/152 64,982.40 GBP 26/03/2025 Supply and Delivery of 2
Wheeled Bins
01/04/2025 -
31/07/2025
Covanburn Contracts Ltd SLC/PS/COMENT/23/
019/6/018
60,123.51 GBP 26/03/2025 NEC3 Engineering and
Construction Short Contract for
Scottish Play Area Investment
Programme Bothwell &
Uddingston
14/04/2025 -
02/06/2025 
240

Page 241

Contract extensions awarded over £50,000 in value 
Contractor Contract Reference Value of
Contract
Awarded
Value of
Extension
Date of
Extension
Brief Description Contract
Extension
period 
Fraser Tool Hire
Ltd
SLC/PS/COMENT/21/003 1,458,768.00
GBP
£748,834.94 11/12/2024 Hire and Maintenance of
Small Plant including
Independent Hand Arm
Vibration and Noise Testing
10/01/2025 -
09/01/2028
Electrical Testing
Ltd
SLC/PS/COMENT/22/060 400,000.00 GBP £112,897.88 20/12/2024 Mini Competition for The
Structural Testing and
Visual Inspection of Lighting
Columns under the YPO
Street Lighting Products and
Services Framework
reference 1027 – Lot 5
16/01/2025 -
15/01/2026
Enva Organics
Recycling Ltd
SLC/PS/COMENT/21/117/A, C
& E
8,256,404.10
GBP
£2,234,748.32 07/02/2025 Mini Competition for the
Receipt and Treatment of
Organic Waste
01/04/2025 -
31/03/2027
Coffee
Conscience Ltd
SLC/PS/COMENT/21/225 65,000.00 GBP £46,847.84 11/03/2025 Supply of Coffee and
Associated Products
24/03/2025 -
23/03/2027
SLR Consulting
Ltd
SLC/PS/COMENT/22/148 134,658.00 GBP £59,146.00 13/03/2025 Waste Consultancy
Services - Direct Award
under the ESPO
Consultancy Services
Framework ref 664_21
01/04/2025 -
31/03/2026
Fuchs Lubricants
(UK) Plc
SLC/PS/COMENT/21/216 156,000.00 GBP £60,444.47 20/03/2025 Supply and Delivery of
Lubricant Oils, Greases and
Anti-Freeze
09/05/2025 -
08/05/2026
Bunzl Greenham SLC/PS/FINCOR/22/103 2,700,000.00
GBP
£754,223.73 22/03/2025 Supply and Delivery of
Personal Protective
Equipment (PPE)
11/04/2025 -
10/04/2026 
241

Page 242

242