Council Offices, Almada Street        
Hamilton, ML3 0AA 
Friday, 02 May 2025 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 13 May 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John
Anderson, Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Andrea Cowan,
Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal
Johnston-Dempsey, Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian
McAllan, Kenny McCreary, Davie McLachlan, Carol Nugent, Kirsten Robb, Helen Toner,
David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lesley
McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott, David
Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources
Committee held on 25 February 2025 submitted for approval as a correct
record.  (Copy attached) 
5 - 10 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2024/2025
Joint report dated 23 April 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
11 - 20 
4 Community and Enterprise Resources - Capital Budget Monitoring
2024/2025
Joint report dated 15 April 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
21 - 24 
5 Community and Enterprise Resources - Workforce Monitoring - January
and February 2025
Joint report dated 3 April 2025 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources). 
(Copy attached) 
25 - 32 
Item(s) for Decision 
6 Community and Enterprise Resource Plan 2025/2026
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
33 - 60 
7 Employability - Annual Investment Plan
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
61 - 78 
8 Community Benefit Funds – Renewable Energy Fund - Grant Applications
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
79 - 88 
9 Renewable Energy Fund – New Windfarm Contributions
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
89 - 94 
10  UK Shared Prosperity Fund 2025/2026
Report dated 29 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
95 - 100 
2

Page 3

Item(s) for Noting 
11  Community Benefit Funds – 2024/2025 Annual Report
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
101 - 114 
12  Larkhall Leisure Centre Progress Update
Report dated 23 April 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
115 - 118 
Urgent Business 
13  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 25 February 2025 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Andy
Carmichael, Councillor Ross Clark (substitute for Councillor Helen Toner), Councillor Gerry
Convery, Councillor Andrea Cowan, Councillor Margaret Cowie, Councillor Maureen Devlin
(Depute), Councillor Colin Dewar, Councillor Gladys Ferguson-Miller, Councillor Ross Gowland,
Councillor Cal Johnston-Dempsey, Councillor Susan Kerr, Councillor Richard Lockhart, Councillor
Ian McAllan, Councillor Kenny McCreary, Councillor Davie McLachlan, Councillor Carol Nugent,
Councillor David Shearer (substitute for Councillor Hugh Macdonald), Councillor David Watson 
Councillors' Apologies:
Councillor Poppy Corbett, Councillor Joe Fagan (ex officio), Councillor Graeme Horne, Councillor
Martin Lennon, Councillor Hugh Macdonald, Councillor Helen Toner 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
F Carlin, Head of Planning and Regulatory Services; K Carr, Head of Facilities, Waste and Grounds
Services; K Lean, Economic Development Manager (Funding and Rural); K McGuire, Waste
Services Manager; C Park, Head of Roads, Transportation and Fleet Services
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); L Harvey, Finance Manager (Resources); E Maxwell, HR
Business Manager; T Slater, Administration Adviser; N Tollan, Administration Assistant 
1 Declaration of Interests 
No interests were declared. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 26
November 2024 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Community and Enterprise Resources - Revenue Budget Monitoring 2024/2025 
A joint report dated 6 February 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April to 27 December 2024
and providing a forecast for the year to 31 March 2025 for Community and Enterprise
Resources.
2
5

Page 6

A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report. 
At 27 December 2024, the projected outturn position for the Resource, before transfers to
reserves, was an underspend of £0.040 million.  Following the Council’s Probable Outturn
exercise, the forecast to 31 March 2025 was a breakeven position, after approved transfers to
reserves. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in the appendices to the report. 
Members asked officers to convey their thanks, on behalf of the Committee, to employees
across the Resources for their work during and following the recent storm. 
Officers responded to members’ questions in relation to:- 
 employee costs and the actions being taken to fill vacancies.  The HR Business Manager
undertook to look into whether vacancy numbers could be provided to the member
concerned
 responsibility for clearing fallen trees and the options available to the Council to charge
private land-owners
 the previous provision of vacancy numbers in workforce monitoring reports.  The HR
Business Manager explained that this information was provided in Council-wide reports
and that, due to the change to the Fusion system, work was still underway to finalise the
information that could be provided, however, she would take back the member’s
comments in relation to this 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position, after approved transfers to
reserves, as detailed in Appendix A of the report, be noted; and 
(2) that the proposed budget virements, as detailed in the appendices to the report, be
approved. 
[Reference: Minutes of 26 November 2024 (Paragraph 3)] 
4 Community and Enterprise Resources - Capital Budget Monitoring 2024/2025 
A joint report dated 28 January 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ Capital Programme 2024/2025 and summarising the
expenditure position at 30 December 2024. 
The revised Capital Programme for 2024/2025 for the Resource amounted to £47.364 million. 
This was based on the overall Capital Programme for 2024/2025 and included adjustments
approved by the Executive Committee on 11 December 2024. 
Appendix A to the report detailed the financial position for the Resource and provided a forecast
for the financial year of £38.925 million.  This forecast underspend reflected the timing of spend
across the year and funding would be carried forward to 2025/2026 to allow projects to be
completed.  Actual expenditure to 30 December 2024 was £20.093 million.
6

Page 7

The Committee decided: that the Community and Enterprise Resources’ Capital
Programme of £47.364 million, and forecast expenditure of
£38.925 million, be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 4) and Minutes of the Executive
Committee of 11 December 2024 (Paragraph 4)] 
5 Community and Enterprise Resources - Workforce Monitoring – October to
December 2024 
A joint report dated 27 January 2025 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period October to
December 2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews 
The HR Business Manager responded to a member’s question in relation to the increase in the
number of violent incidents, and undertook to look further into the violent incidents statistic to
provide reassurance to Committee. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 5)] 
6 Community Benefit Funds – Renewable Energy Fund - Grant Applications 
A report dated 5 February 2025 by the Executive Director (Community and Enterprise
Resources) was submitted on 7 applications to the Renewable Energy Fund (REF).  This
community benefit funding, secured from windfarm developers, had been established to provide
funding to suitable projects providing community benefits in eligible areas. 
It was proposed that, subject to the applicants providing written confirmation that all other
additional funding for the projects had been secured, a grant be awarded up to a maximum of:- 
 £66,462 towards eligible costs associated with the upgrade of a community play park
within Braidwood to Braidwood Community Group from Black Law Windfarm
 £33,136 towards eligible costs associated with the refurbishment of 3 toilets within the
Club to Coalburn Bowling Club from Auchrobert Windfarm
 £199,500 towards eligible costs associated with the refurbishment of the pavilion within
Stonehouse Park to Friends of Stonehouse Park from Bank End Rig Windfarm
 £41,136 towards eligible costs associated with the employment of an Operations Officer to
Lanark Community Development Trust from Black Law Windfarm
 £153,910.89 towards eligible costs associated with the refurbishment of McKirdy 3G
football pitch to Lesmahagow Community Football Club from Auchrobert Windfarm
 £54,041.76 towards eligible costs associated with the redesign of the community car park
to Sandford and Upper Avondale Community Council from Bank End Rig Windfarm
 £70,897 towards eligible costs associated with the employment of a Development Officer
to the Welcome All Hub from Muirhall Stallashaw Windfarm
7

Page 8

The Committee decided: that, subject to the applicants providing written confirmation
that all other funding for the projects had been secured, a
grant be awarded of up to a maximum of:- 
 £66,462 towards eligible costs associated with the
upgrade of a community play park within Braidwood
to Braidwood Community Group from Black Law
Windfarm
 £33,136 towards eligible costs associated with the
refurbishment of 3 toilets within the Club to Coalburn
Bowling Club from Auchrobert Windfarm
 £199,500 towards eligible costs associated with the
refurbishment of the pavilion within Stonehouse Park
to Friends of Stonehouse Park from Bank End Rig
Windfarm
 £41,136 towards eligible costs associated with the
employment of an Operations Officer to Lanark
Community Development Trust from Black Law
Windfarm
 £153,910.89 towards eligible costs associated with
the refurbishment of McKirdy 3G football pitch to
Lesmahagow Community Football Club from
Auchrobert Windfarm
 £54,041.76 towards eligible costs associated with the
redesign of the community car park to Sandford and
Upper Avondale Community Council from Bank End
Rig Windfarm
 £70,897 towards eligible costs associated with the
employment of a Development Officer to Welcome All
Hub from Muirhall Stallashaw Windfarm 
[Reference: Minutes of 6 February 2024 (Paragraph 8)] 
7 South Lanarkshire Inward Investment and Property Enquiries Update 
A report dated 5 February 2025 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the development of the Council’s approach to
Inward Investment. 
Inward Investment made a distinct, positive and significant impact on the economy at national,
regional and local level.  The term ‘inward investment’ described both foreign direct investment
(FDI) and similar investment from the rest of the UK into Scotland, the Glasgow City Region and
the local authority area. 
Information was provided on the:- 
 South Lanarkshire Inward Investment Strategy, approved by Committee on 6 February
2024
 progress that had been made across the 5 workstreams
 property enquiries for business space received from April to December 2024
 key challenges as highlighted by the recent review undertaken by Ryden LLP property
consultants and reported to Committee on 26 November 2024
8

Page 9

The Head of Enterprise and Sustainable Development Services responded to members’
question in relation to:- 
 the challenges with sites under 10,000 square feet
 encouraging the private sector to develop sites
 liaising with Planning officers in terms of the Local Plan renewal and looking at sites in
rural areas that could accommodate smaller units 
The Committee decided: 
(1) that the progress on the development of the Council’s approach to Inward Investment be
noted; and 
(2) that the range and number of enquiries for business space in the South Lanarkshire area
be noted. 
[Reference: Minutes of 26 November 2024 (Paragraph 7) and 6 February 2024 (Paragraph 11)] 
8 Waste Policy Update 
A report dated 5 February 2025 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on developments in relation to forthcoming
waste policy and legislation. 
Sustainable waste management practices were an integral part of the Scottish Government’s
goal to move towards a more Circular Economy, which was where resources were conserved,
and waste was minimised.  Establishing a Circular Economy was vital to reducing greenhouse
gas emissions and meeting the Government’s Net Zero ambitions. 
Updates were provided on the:- 
 Circular Economy (Scotland) Act 2024
 Circular Economy and Waste Route Map
 Deposit Return scheme
 Producer Responsibility Obligations (Packaging Waste) Regulations 2024
 UK Emissions Trading Scheme (decarbonising disposal) 
Officers responded to members’ questions in relation to:- 
 the use of funding arising from the Producer Responsibility Obligations (Packaging Waste)
Regulations 2024
 concerns about changes to the Deposit Return Scheme potentially no longer including
glass
 concerns about future proposals to possibly reduce the size of bins or frequency of bin
collections 
The Committee decided: that the developments in relation to forthcoming waste
policy and legislation be noted. 
9 Waste Management Review Update 
A report dated 5 February 2025 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the progress of the Waste Management
Review.
9

Page 10

Information was provided on:- 
 those elements of the Review already approved by Council committees as follows:-
 the implementation of a booking system for Household Waste Recycling Centres,
approved by this Committee on 18 June 2024
 operational changes required to allow Waste Upholstered Domestic Seating (WUDS)
to be collected and treated, approved by this Committee on 18 June 2024
 the introduction of a charge for the collection of garden waste, approved by the
Executive Committee on 26 June 2024
 the following workstreams undertaken as part of the Review:-
 Household Waste and Recycling Centres
 Waste Compositional Analysis
 Kerbside Collections 
Information was also provided on work undertaken in relation to:- 
 collections modelling and routing
 depots and infrastructure 
Officers responded to members’ questions in relation to:- 
 the impact on residual waste of the charge introduced for garden waste
 the provision of service at Carluke and the reason for the recent closure
 the Extended Producer Responsibility Scheme, advising that this was a UK-wide scheme 
The Committee decided: that the progress of the Waste Management Review be
noted. 
[Reference: Minutes of 18 June 2024 (Paragraphs 10 and 11) and Minutes of the Executive
Committee of 26 June 2024 (Paragraph 11)] 
Councillor Convery left the meeting during this item of business 
10 Urgent Business 
There were no items of urgent business. 
10

Page 11

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 21 February 2025 for Community and Enterprise
Resources
 provide a forecast for the year to 31 March 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the forecast to 31 March 2025 of a breakeven position after approved
transfer to reserves, as detailed in Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the fourth revenue budget monitoring report presented to the Community and
Enterprise Committee for the financial year 2024/2025. 
3.2. The report details the financial position for Community and Enterprise Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendices B to G provides the detailed financial
position with variance explanations by budget category. 
3.3. This report reflects the actual spend to 21 February 2025 within the Resource budget
and reflects the expected outturn forecast on expenditure and income at this date.   
4. Employee Implications
4.1. None.   
5. Financial Implications
5.1. As at 21 February 2025, the projected outturn position for 2024/2025 is an underspend
of £0.040m before approved transfers to reserves.  This is outlined in the attached
appendices.    
3
11

Page 12

5.2. Probable Outturn - Following the Council’s formal Probable Outturn exercise, the
forecast for the budget to 31 March 2025 is a breakeven position after approved
transfers to reserves of £0.040m.  This position is outline in Appendices B to G.   
5.3. Work is ongoing to finalise the yearend position for the Resource and this will be
reported to the Executive Committee in June and to the next meeting of this
committee.   
5.4. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however these are mitigated by additional funds being added to the
budget. 
7.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate.   
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and therefore no integrated impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent  
12

Page 13

Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 27 December 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Louise Harvey, Finance Manager
Ext:  2658 (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
13

Page 14

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 12 Ended 21 February 2025 (No. 12) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Facilities, Waste and Grounds Services 81,493 81,080 413 0.51% 66,422
Planning and Regulatory Services 4,874 4,334 540 11.08% 3,708
Leisure Services 21,747 21,759 (12) (0.06%) 19,485
Enterprise and Sustainable Development 6,694 6,327 367 5.48% 2,047
Roads, Transportation and Fleet Services 17,948 19,216 (1,268) (7.06%) 11,574
Net Controllable Exp. 132,756 132,716 40 0.03% 103,236 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The anticipated underspend is mainly due to turnover and staff vacancies, partially offset by under
recoveries in School Meals within Facilities as well as less income recovered from Care of Gardens
within Grounds. The anticipated Service underspend will be offset by overspends within the overall
Resource. 
Planning and
Regulatory Services
The anticipated underspend is mainly due to staff vacancies and turnover within the Environmental
Services and Planning & Building Standards teams, and lower than budgeted costs for Scientific
Services within Environmental Services due to decreased demand.  In addition, there is an over
recovery of income from Planning applications. The anticipated Service underspend will support the
overall Resource balanced budget position.   
Leisure Services No significant variances to report.
Enterprise and
Sustainable
Development
The anticipated underspend is mainly due to staff vacancies and turnover within the Economic
Development and Support teams. The anticipated Service underspend will support the overall Resource
balanced budget position.   
Roads,
Transportation and
Fleet Services
A overspend is anticipated across the service, mainly due to the net costs of Electric vehicles, reduced
income within Parking and the Roads Construction Unit reflecting demand, and increased costs
associated with the upkeep of depots. These overspends are partially offset by an expected underspend
within employee costs due to vacancies and staff turnover.  The anticipated Service overspend will be
managed within the overall Resource position.   
14

Page 15

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 99,423 95,277 4,146 Under 4.17% 82,861 
Property Costs 10,295 11,112 (817) Over (7.94%) 8,406 
Supplies & Services 20,712 20,648 64 Under 0.31% 15,179 
Transport & Plant 23,784 24,181 (397) Over (1.67%) 16,004 
Administration Costs 874 987 (113) Over (12.93%) 811 
Payments to Other Bodies 19,906 19,886 20 Under 0.10% 13,927 
Payments to Contractors 40,023 41,222 (1,199) Over (3.00%) 35,244 
Transfer Payments 617 617 0 - 0.00% 611 
Financing Charges 207 199 8 Under 3.86% 16 
Total Controllable Exp. 215,841 214,129 1,712 Under 0.79% 173,059 
Total Controllable Inc. (83,085) (81,413) (1,672) Under (2.01%) (69,823) 
Net Controllable Exp. 132,756 132,716 40 Under 0.03% 103,236 
Transfer to Reserves - 40 (40)    
Position after Transfer to
Reserves 132,756 132,756 0 - 0.0%     
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
Approved Transfers to Reserves 
Detailed in Appendix G.   
15

Page 16

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 62,191 60,272 1,919 Under 3.09% 52,903 1
Property Costs 2,286 2,746 (460) Over (20.12%) 2,135 2
Supplies & Services 10,418 10,596 (178) Over (1.71%) 8,011 3,a
Transport & Plant 9,042 9,270 (228) Over (2.52%) 7,526 4
Administration Costs 181 222 (41) Over (22.65%) 207 5
Payments to Other Bodies 54 51 3 Under 5.56% 40 
Payments to Contractors 18,480 18,531 (51) Over (0.28%) 15,212 6
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 44 49 (5) Over (11.36%) 8 
Total Controllable Exp. 102,696 101,737 959 Under 0.93% 86,042 
Total Controllable Inc. (21,203) (20,657) (546) Under (2.58%) (19,620) 7,a
Net Controllable Exp. 81,493 81,080 413 Under 0.51% 66,422 
Variance Explanations 
1. The forecast underspend is due to vacancies and staff turnover and is partially offset by an overspend in overtime costs.
2. The forecast overspend is due to increased costs for cleaning and janitorial equipment within Facilities and for rates at the former
Civic Amenity Site at Muttonhole Road.
3. The forecast overspend is mainly due to spend on purchase and repairs of equipment within Facilities Management and higher than
budgeted costs for domestic waste and recyclate bins within Waste services.
4. The forecast overspend relates mainly to increased costs for vehicle maintenance within Waste, Grounds and Streets and greater
costs for leasing within Streets.  
5. The forecast overspend relates to cost of medical referrals and printing of communication materials.  
6. The forecast anticipates an overspend mainly due to higher that anticipated costs on the upkeep of the Crematorium.
7. The projected under recovery in income relates to less demand for additional service requests within Street Cleansing, a reduction in
School meal income within Facilities, a decrease in uptake of the Care of Gardens service and reduced use of reserve income from
adoptions, within Grounds. These are partially offset by additional service requests for clearances within Waste services.   
Budget Virements 
a. Realignment of budget to reflect realignment of Universal Free School Meal funding within Facilities. Net effect £0.000m: Supplies
and Services (£0.320m), Income £0.320m. 
16

Page 17

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Planning and Regulatory Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7,359 7,065 294 Under 4.00% 6,168 1
Property Costs 38 33 5 Under 13.16% 14 
Supplies & Services 207 204 3 Under 1.45% 153 b
Transport & Plant 127 102 25 Under 19.69% 88 2
Administration Costs 134 173 (39) Over (29.10%) 155 3,a
Payments to Other Bodies 422 371 51 Under 12.09% 236 4,a
Payments to Contractors 830 813 17 Under 2.05% 721 a
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 46 30 16 Under 34.78% 2 
Total Controllable Exp. 9,163 8,791 372 Under 4.06% 7,537 
Total Controllable Inc. (4,289) (4,457) 168 Over 3.92% (3,829) 5
Net Controllable Exp. 4,874 4,334 540 Under 11.08% 3,708 
Variance Explanations 
1. The forecast underspend is mainly due to staff vacancies and turnover.
2. The forecast underspend reflects pool car usage within Environmental Services.
3. The forecast overspend reflects unbudgeted legal costs for an ongoing Environmental Services case.
4. Less spend is predicted on Scientific Services within Environmental Services and spend associated with the Local Plan. 
5. A greater level of income from Planning applications is forecast. 
Budget Virements  
a. Realignment of budget to reflect service delivery within Air Quality Projects. Net effect £0.000m: Supplies and Services (£0.042m),
Administration £0.017m, Payment to Other Bodies (£0.121m), Payment to Contractor £0.146m. 
17

Page 18

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 4 4 0 - 0.00% 4 
Property Costs 5,624 5,624 0 - 0.00% 3,851 
Supplies & Services 0 0 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 8 8 0 - 0.00% 8 
Payments to Other Bodies 80 92 (12) Over (15.00%) 1 1
Payments to Contractors 16,031 16,031 0 - 0.00% 15,621 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 0 0 0 - 0.00% 0 
Total Controllable Exp. 21,747 21,759 (12) Over (0.06%) 19,485 
Total Controllable Inc. 0 0 0 - 0.00% 0 
Net Controllable Exp. 21,747 21,759 (12) Over (0.06%) 19,485 
Variance Explanations 
1. The overspend relates to the annual fireworks display at Strathclyde Park being more than budget. 
18

Page 19

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 8,728 8,409 319 Under 3.65% 7,088 1
Property Costs 582 592 (10) Over (1.72%) 554 
Supplies & Services 144 123 21 Under 14.58% 95 
Transport & Plant 336 337 (1) Over (0.30%) 62 
Administration Costs 153 123 30 Under 19.61% 73 2
Payments to Other Bodies 13,476 13,408 68 Under 0.50% 7,696 3,a
Payments to Contractors 644 703 (59) Over (9.16%) 334 4
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 67 56 11 Under 16.42% 2 
Total Controllable Exp. 24,130 23,751 379 Under 1.57% 15,904 
Total Controllable Inc. (17,436) (17,424) (12) Under (0.07%) (13,857) 
Net Controllable Exp. 6,694 6,327 367 Under 5.48% 2,047 
Variance Explanations 
1. The forecast underspend is mainly due to staff turnover within Economic Development and Support Administration.
2. A projected underspend is mainly due to less costs anticipated for telephones and membership fees.
3. The forecast underspend is mainly due to reduced spend on Business Support Grants.
4. The overspend relates to the cost of repair works.   
Budget Virements 
a. Transfer of budget for capital funded from revenue in respect of the SLC Place Based Investment Programme.Net effect (£0.223m):
Payment to Other Bodies (£0.223m). 
19

Page 20

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 21 February 2025 (No.12) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 21,141 19,527 1,614 Under 7.63% 16,698 1
Property Costs 1,765 2,117 (352) Over (19.94%) 1,852 2
Supplies & Services 9,943 9,725 218 Under 2.19% 6,920 3
Transport & Plant 14,279 14,472 (193) Over (1.35%) 8,328 4,a
Administration Costs 398 461 (63) Over (15.83%) 368 5
Payments to Other Bodies 5,874 5,964 (90) Over (1.53%) 5,954 6
Payments to Contractors 4,038 5,144 (1,106) Over (27.39%) 3,356 7
Transfer Payments 617 617 0 - 0.00% 611 
Financing Charges 50 64 (14) Over (28.00%) 4 
Total Controllable Exp. 58,105 58,091 14 Under 0.02% 44,091 
Total Controllable Inc. (40,157) (38,875) (1,282) Under (3.19%) (32,517) 8,a
Net Controllable Exp. 17,948 19,216 (1,268) Over (7.06%) 11,574 
Transfer to Reserves - 40 (40)    
Position after Transfer to
Reserves 17,948 19,256 (1,308) Over (7.29%)   
Variance Explanations 
1. The forecast underspend is mainly due to vacancies and staff turnover.
2. The forecast overspend reflects higher than budgeted costs for water and repairs & maintenance for Roads’ depots and higher cost of
electrical power for the charging of electrical vehicles.
3. The forecast underspend is mainly due to less spend on materials within Roads Construction reflecting the type of works carried out.
4. The forecast overspend is due to the net effect of less spend on vehicle hires within Roads and overspends within the Fleet workshop
covering outsider repairs, spares, materials and tyres.
5. The forecast overspend relates to cost of medical referrals and training costs within Roads.
6. The forecasted overspend relates to payments for winter weather forecasts being greater than anticipated. 
7. The forecasted overspend is mainly due to higher than budgeted costs for bridge repairs and statutory inspections and increased
contractor costs for maintenance of traffic lights. In addition, there are greater costs predicted for payments for lighting for routine
maintenance, partially offset by a reduced level of spend on the use of sub-contractors.
8. Income is forecasted to be under recovered due to lower than budgeted parking and electrical vehicle income, and in relation to the
Roads Construction Unit reflecting the type of works (refer 3 above). Within Fleet Services there is an under recovery in Leasing
Management Fee due to the timing of vehicles going off/on lease.  These are partially offset by over recovery of income due to
permits, rechargeable street lighting works and Inspection Fees, taxi inspections and sale of vehicles. 
Budget Virements 
a. Realignment of budget to reflect leasing and fuel for pool cars within Fleet Services. Net effect £0.000m: Transport and Plant
(£0.265m), Income £0.265m. 
Transfer to Reserves (£0.040m):
i. Fleet Sinking Fund contribution (£0.025m)
ii. Year 3 of 4 of Electric Vehicle Payback (£0.015m)
20

Page 21

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April 2024 to 21 February 2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources capital programme of £47.364
million, and forecast expenditure of £38.925 million, be noted.
[1recs]
3. Background
3.1. This is the fourth capital monitoring report presented to the Community and Enterprise
Resources Committee for the financial year 2024/2025. 
3.2. The revised budget of £47.364 million for Community and Enterprise Resources is
based on the overall Capital Programme for 2024/2025, as approved by the Executive
Committee on 26 June 2024 and adjusted for approved changes during the year.  
There has been no change to this budget since the last report to this Committee. 
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2024/2025 Budget 
As detailed in Section 3.2, the revised capital programme for Community and
Enterprise Resources is £47.364 million.  
4
21

Page 22

5.2. 2024/2025 Forecast
Appendix A shows a forecast for the financial year of £38.925 million, an underspend
of £8.439 million.  This forecast underspend reflects the timing of spend across this
year and into the new financial year, and results in budget required in 2025/2026 rather
than 2024/2025.  Funding for projects remaining underspent at the financial year end
will be carried forward to allow the projects to be completed in 2025/2026. Officers
have continued to work to maximise spend in 2024/2025, where possible. 
5.3. The year-end position is currently being finalised and this will be reported to the
Executive Committee on 25 June 2025 and the next meeting of this Committee (12
August 2025). 
5.4. For information, actual expenditure to 21 February 2025 is £24.308 million.  
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact assessment
is required.   
8.2. There is also no requirement to undertake any consultation in terms of the information
contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
15 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 26 June 2024  
22

Page 23

List of Background Papers
▪ Financial ledger to 21 February 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
23

Page 24

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024-2025
Community and Enterprise Resources Programme
For Period 1 April 2024 – 21 February 2025 
Community & Enterprise Base
Budget 
£000
Budget
Adjustment
s
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000 
Facilities, Waste and Grounds  2,846  252  -  3,098  2,415  683  1,375 
Enterprise and Sustainable
Development 
28,558  8,097  (13,886)  22,769  17,048  5,721  9,375 
Roads, Transport and Fleet  19,170  4,181  (1,854)  21,497  19,462  2,035  13,558 
TOTAL  50,574  12,530  (15,740)  47,364  38,925  8,439  24,308 
24

Page 25

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – January and February 2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for January and February 2025 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for January and February 2025
relating to Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 December 2024 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee. This report for Community and
Enterprise Resources provides information on the position for January and February
2025. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of February 2025 for
Community and Enterprise Resources. 
The Resource absence figure for February 2025 was 7.9%, this figure has increased
by 0.7% when compared to the previous month and is 0.9% higher than the Council-
wide figure. Compared to February 2024, the Resource absence figure has
increased by 0.7%.
5
25

Page 26

Based on the absence figures at February 2024 and annual trends, the projected
annual average absence for the Resource for 2024/2025 is 6.6%, compared to a
Council-wide average figure of 5.9%.   
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence.
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 306 referrals were made this period. This
represents a decrease of 35 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2)
There were 8 accidents/incidents recorded within the Resource this period. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 12 disciplinary hearings were held within the Resource, this is a
decrease of 1 when compared to the same period last year. Four appeals were
heard by the Resource, 2 are in pending. Two grievances were raised within the
Resource, this figure has increased by 2 when compared to the same period last
year. One Dignity at Work complaint was raised within the Resource, this figure has
increased by 1 when compared to the same period last year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 15 leavers this period eligible for an exit interview. The number
of leavers has decreased by 26, when compared with the same period last year.
During the period 1 exit interview was conducted, this figure has decreased by 4
when compared to the same period last year. 
5. Staffing Watch 
5.1. There has been a decrease of 52 employees in post from 14 September 2024 to 14
December 2024.   
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no Climate Change, Sustainability and Environmental Implications in
terms of the information contained within this report. 
9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required.
26

Page 27

10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
3 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 25 February 2025 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
27

Page 28

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 4.2 October 7.5 7.0 7.2 October 7.1 6.3 6.7 October 5.8 5.1 6.0
November 4.2 2.6 3.6 November 8.3 8.1 8.3 November 7.7 7.3 7.6 November 6.5 6.2 6.9
December 3.7 3.0 3.8 December 8.8 7.5 8.1 December 8.0 6.8 7.4 December 7.0 6.6 7.0
January 2.6 3.6 3.9 January 7.4 7.4 7.8 January 6.7 6.9 7.2 January 5.8 6.1 6.7
February 3.6 4.0 4.0 February 7.4 7.8 8.7 February 6.9 7.2 7.9 February 5.9 6.4 7.0
March 3.9 3.2 March 7.9 7.9 March 7.3 7.2 March 6.4 6.3
Annual Average 3.8 3.2 3.7 Annual Average 7.4 6.8 7.1 Annual Average 6.9 6.2 6.6 Annual Average 5.7 5.4 5.9
Average Apr-Feb 3.8 3.1 3.7 Average Apr-Feb 7.4 6.7 7.1 Average Apr-Feb 6.8 6.2 6.5 Average Apr-Feb 5.6 5.3 5.8
587 2821 3408 15654
Resource Total
No of Employees at 28 February 2025 No of Employees at 28 February 2025 No of Employees at 28 February 2025 No of Employees at 28 February 2025
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council WideManual Workers
28

Page 29

Jan - Feb Jan - Feb
2024 2025
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 86 78
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 0
TOTAL 341 306
Jan - Feb Jan - Feb
2024 2025
Specified Injuries* 1 0
Over 7 day absences 7 1
Over 3 day absences** 1 0
Minor 23 5
Near Miss *** 3 0
Violent Incident:  Physical**** 8 2
Violent Incident:  Verbal***** 2 0
Total Accidents/Incidents 45 8
Jan - Feb Jan - Feb
2024 2025
Total Number of Hearings 13 12
Total Number of Appeals 0 4
Appeals Pending 0 2
Time Taken to Convene Hearing October - Jan to Feb 2025
0-3 Weeks 4-6 Weeks Over 6 Weeks
2 5 5
Jan - Feb Jan - Feb
2024 2025
Number of Grievances 0 2
Still in Progress 0 2
Jan - Feb Jan - Feb
2024 2025
Number of Incidents 0 1
Still in Process 0 1
RECORD OF DIGNITY AT WORK
95 101
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
38 41
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
122 86
29

Page 30

Jan - Feb Jan - Feb
2024 2025
Career Advancement 0 2
Child Caring / Caring Responsibilities 0 0
Disatisfaction with terms and conditions 2 0
Further Education 0 0
Moving outwith area 0 1
Personal Reasons 0 6
Poor relationship with managers / colleagues 2 0
Travelling difficulties 0 0
Other 37 6
Total Number of Leavers Eligible for Exit Interview 41 15
Number of Exit Interviews conducted 5 1
Percentage of interviews conducted 12% 7%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
30

Page 31

As at 14 December 2024
Total Number of Employees
F/T P/T F/T P/T
1206 378 240 1563
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1669.72 416.48 269.41 47.94 18.30 0.00 2.00 0.00 2428.85
As at 14 September 2024
Total Number of Employees
F/T P/T F/T P/T
1244 384 235 1576
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1711.95 415.46 269.47 48.94 18.30 0.00 2.00 0.00 2471.12
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3387
MALE FEMALE TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3439
31

Page 32

32

Page 33

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resource Plan 2025/2026 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Community and Enterprise Resource Plan 2025/2026 for approval
and note the monitoring arrangements
[1purpose]
2. Recommendations
2.1. The Committee is asked to approve the following recommendation(s):-
[
(1) that the Resource Plan 2025/2026, attached at Appendix 1, be approved;
(2) that the Resource Plan 2025/2026 be uploaded onto the Council’s website
following consideration by this Committee;
(3) that, following Committee approval, all Resource Plans will be presented to
Executive Committee on 25 June 2025, for noting; and
(4) that Progress Reports on the Resource Plan 2025/2026 be provided at Quarter
2 and Quarter 4 to future meetings of this Committee. 
3. Background
3.1. The Community and Enterprise Resource Plan for 2025/2026 was prepared in line
with the corporate Resource Planning guidance. 
3.2. The Resource Plan is a key element of the Council’s performance management
arrangements.  It provides details of the context within which Community and
Enterprise Resources operates and establishes actions and measures for the year
ahead based on the priorities and outcomes set out in the Council Plan Connect
2022 to 2027. 
3.3. Performance management is a keystone of Best Value and ensures that the Council
can demonstrate sound governance arrangements.  The Resource Plan is one part
of the Council’s framework for planning and budgeting and demonstrates how this
leads to effective front line service delivery. 
3.4. As part of this framework, the Community and Enterprise Resource Plan reflects the
aspirations of the Council Plan and the Community Plan as well as being
complemented by the details of individual Service, Business and other Plans. 
Ultimately, these details are included in the key work objectives of individual officers. 
This demonstrates the ‘Golden Thread’ of performance management which ensures
a clear understanding of the Council’s vision, values, priorities and outcomes at all
levels. 
6
33

Page 34

3.5. The current format for performance reporting has been established since 2007 and is
used for Executive Directors’ reports to the Chief Executive, Resource Management
Teams, Resource Committees and the Performance and Review Scrutiny Forum. 
The focus has been on reporting progress on Council outcomes, statutory
performance indicators, other key performance measures and high-level Resource
outcomes. Progress reports are provided at Quarter 2 and Quarter 4 to this
Committee. 
3.6. In preparing the Community and Enterprise Resource Plan, account has also been
taken of the need to ensure a robust response to Risk Management and Control. 
Risks associated with delivery of the actions in this Resource Plan have been
identified and evaluated and are listed in the Resource Risk Register.  Where
necessary, controls or further actions to mitigate these risks have been agreed. 
Such actions are tracked through the Resource Risk Control Plan which is kept
under review by the Risk Sponsor for the Resource. 
3.7. Following approval at individual Resource Committees, all Resource Plans will be
presented, as a pack, to Executive Committee on 25 June 2025, for noting. 
4. Resource Plan 2025/2026
4.1. The Community and Enterprise Resource Plan 2025/2026 is attached as Appendix 1
and is structured around the following headings:- 
1. Introduction 
2. Key areas for the year ahead 
3. Resource outcomes 
4. Measures and actions 
5. Resourcing the Plan 
Resource Outcomes 2025/2026
4.2. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2025/2026.  To support these outcomes, the Resource has
developed performance measures in an action plan which is set out in section 4 of
the Resource Plan.  Key or strategic measures will be included in the Council Plan
Connect Progress Reports 2025/2026, with the rest being monitored and reported at
Resource level. 
Monitoring and Reporting
4.3. As part of the performance management arrangements, the Committee will receive a
mid-year update of progress on the measures in the Resource Plan covering the
period 1 April to 30 September 2025 (Quarter 2) as well as an end of year progress
report covering the full year 1 April 2025 to 31 March 2026 (Quarter 4). 
5. Employee Implications
5.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable and, in turn, the Performance Appraisal process for individual
employees. 
6. Financial Implications
6.1. The outcomes within the Resource Plan are reflected in the respective Resource
Revenue and Capital budgets and, longer term, within the framework of the Council’s
approved Financial Strategy.
34

Page 35

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change or environmental implications as a result of this report. 
7.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2025/2026. 
8. Other Implications
8.1. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
9.  Integrated Impact Assessment and Consultation Requirements
9.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
9.2. There is no requirement to undertake any consultation in terms of the information
contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values, Priorities and
Outcomes in the Council Plan Connect 2022-27 
Previous References
 None 
List of Background Papers
 Council Plan 2022-2027 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Anne Lewis (Performance and Development Officer)
E-mail:  anne.lewis@southlanarkshire.gov.uk 
35

Page 36

36

Page 37

1 
Community and Enterprise Resources 
Community and Enterprise Resource Plan 2025-26 
6
37

Page 38

2 
Section      Contents 
1.0   Introduction
2.0   Key areas of focus for the year ahead
3.0   Resource outcomes
4.0   Measures and actions
5.0   Resourcing the Plan
38

Page 39

3 
Section One – Introduction 
I am pleased to introduce our Resource Plan for 2025-26 which sets out our intended outcomes
and priorities for the coming year. This is the main annual business planning document for the
resource. It reflects the council’s key priorities as set out in the Council Plan ‘Connect’ and
provides an overview of the resource’s main areas of activity.   
Our resource comprises the following four service areas – facilities, waste and grounds
services; roads, transportation and fleet services; planning and regulatory services; and
enterprise and sustainable development services.  The resource employs 3415 people who
together provide a wide range of services for local communities, including: 
• delivering key services within schools and council premises, including cleaning, catering,
receptionist, janitorial, concierge, and crossing patrol services
• keeping our streets clean and maintaining and developing public parks, open spaces, tree
stock, fixed play areas, sports fields, golf courses, allotments, and food growing
opportunities
• collecting and disposing of waste and encouraging recycling
• managing and maintaining the council’s cemeteries and crematorium, providing
bereavement services, and ensuring the provision of burial ground 
• maintaining our roads and transportation network to support safe and effective transport,
and promoting active travel
• procuring and managing the council’s vehicle fleet, including refuse collection, roads
maintenance, street sweeping and passenger transport
• providing planning and building standard services which guide and control physical
development and land use in the area, ensure the health and safety of persons in or about
buildings, ensure the conservation of energy and the achievement of sustainable
development
• protecting public health through the delivery of environmental health services
• providing trading standards to protect consumers and communities 
• promoting economic development and delivering support for local businesses
• delivering effective employability services to support individuals and business
• supporting town centres and physical regeneration, and
• leading the council in developing and promoting sustainability, supporting the transition to a
net zero carbon economy, and addressing climate change. 
The resource also has a significant role to play in managing the relationship between the
council and South Lanarkshire Leisure and Culture (SLLC).  SLLC deliver leisure and cultural
services on behalf of the council and promote the health and wellbeing of South Lanarkshire
residents through libraries, cultural venues, museum, arts centres, indoor and outdoor sports
and leisure centres, community halls and country parks. 
The Resource Plan is an important element of the council’s performance management
arrangements and is complemented by individual service plans and other key business plans
and strategies.  During 2025-26, service teams will continue to be involved in a series of
reviews which will inform how our services are shaped and delivered in the future. 
David Booth
Executive Director
Community and Enterprise Resources 
39

Page 40

4 
Section Two – Key areas of focus for the year ahead 
2.0. Overview 
The resource has identified the main challenges, risks and new developments which will
have significant impact on the delivery of services in the coming year. These are outlined
briefly below. 
2.1. Local Development Plan (LDP) 
The council has a statutory duty to prepare a Local Development Plan for all parts of its
area.  Preparation of the council’s third LDP (LDP3) has recently started.  It will address the
spatial implications of national planning policy, National Planning Framework 4 (NPF4), for
different places at a council-wide level. 
The focus of the plan will be to address challenges, including the climate and nature
emergencies, the embedding of sustainable development principles in decision making,
tackling poverty and disadvantage and health inequalities and embedding the principles of
Local Living through the identification and maintenance of 20-minute neighbourhoods.  The
plan will be place-based with the Place Principle providing the policy context to ensure a
participative approach to the future planning of places, services and infrastructure through
partnership working with council services, transport providers, local communities, and
health and education providers. 
The plan will be people-centred so that it meets the needs and aspirations of people and
communities. Extensive engagement will continue to be carried out with stakeholders,
partners and local communities so that the plan is prepared collaboratively taking into
account a diverse range of views. 
The LDP will support decisions to invest in places by identifying priorities and focussing on
the delivery of outcomes by drawing together all the council’s strategies, plans and the
objectives of the Council Plan, Connect, as well of those of its partners and other
stakeholders.  The LDP must take account of the council’s Community Plan.  The plan will
take an infrastructure first approach so that an understanding of existing capacity and the
requirement for new or improved infrastructure (including schools and health and social
care provision) is an integral part of the plan process and this will inform the site selection
process. New development will be directed to the right locations and will be expected to
meet the principles of placemaking. 
LDP3 will include a Delivery Programme which will set out how the council will implement
the plan and provide certainty for local communities and partners.  The plan will be a key
driver for delivering on the main areas of focus, for example by ensuring there is sufficient
employment land to achieve inclusive economic growth goals and creating a land use
framework for the regeneration of our town centres.  At a council wide level, the plan will
continue to identify opportunities to deliver the council’s affordable housing programme and
reflect the outcomes of the review of the Strategic Commissioning Plan. 
Access to good quality greenspace and safe and accessible active travel routes are also a
key priority for the resource, encouraging physical exercise and improving the wellbeing of
our communities.  The continuing preparation of the council’s Open Space Strategy will
contribute to achieving these aims. 
40

Page 41

5 
The focus for 2025-26 is the completion of the Evidence Report which will inform the spatial
strategy for LDP3. Extensive collaboration has taken place with other services and partners
in terms of data gathering and assessment and the carrying out of engagement. 
The implementation of changes to the Building Regulations in 2024 in relation to the energy
performance of buildings will also be a focus for 2025-26.
2.2. Cost of Living Crisis 
The UK continues to experience the worst cost-of-living crisis in 40 years.  While all sectors
of society are seeing prices rise, the impacts are greatest for those on the lowest
incomes.  The council recognises the immense pressures being faced by households
across South Lanarkshire and acknowledges the potential for additional demands on
council services as a result.  The council has in place a range of support which can help
households manage scarce resources, and services will continue to explore all avenues to
support the most vulnerable in the year ahead. 
While doing all we can to support our communities in these difficult times, the council
recognises that this also presents significant challenges for council services as budgets are
increasingly squeezed by rising costs. This will undoubtedly be the case within Community
and Enterprise Resources. However, working collaboratively across our communities with
all key stakeholders will allow opportunities to be maximised through sustainable economic
growth. 
2.3. Economic Development and Renewal 
The UK, Scottish, Glasgow City Region and South Lanarkshire economies are all facing
real challenges following the global pandemic, our country’s new international trading
position, the war in Ukraine and the climate emergency; all of which impact our lives now
and in the foreseeable future.  Economic recovery in South Lanarkshire is incorporating the
principles of community wealth building and be framed around three key themes of
sustainable development: People, Place and Business (or social, physical, and economic
regeneration). These themes align council and pan-Lanarkshire activity with local, national
and regional strategies, delivering the collaborative approach required to achieve
sustainable and inclusive economic growth. The Economic Strategy (2022-27) sets out the
key priorities and actions for the council and aims “to make South Lanarkshire a flourishing,
green, dynamic and equitable place for all”.   
Working in partnership with North Lanarkshire Council, the delivery of the Business
Gateway Service is now being delivered ‘in-house’ which will deliver a more customer
focussed service, rather than a target driven delivery model, leading to better outcomes for
businesses and the economy. Since this change, all referrals for business advice are
referred directly to the Business Gateway and they are the public facing organisation for
business support within South Lanarkshire. 
Town Centre Regeneration 
Town centres retain a key role at the heart of our communities as a focal point for retail,
business, culture, leisure and social interaction. Our town centres remain a council priority,
and we are working across all our towns to manage change to allow our towns centres to
serve the evolving needs of communities in the future. The way in which we support each
town varies depending on the specific challenges, ranging from large transformational
masterplans in East Kilbride and Hamilton, which have been formally adopted by the
council, to smaller local interventions linking to local priorities and Community Wealth
Building priorities.  
41

Page 42

6 
2.4. External Funding 
UK Government Shared Prosperity Funding (UKSPF) 
Following the UK withdrawal from the European Union, the UK Government outlined
proposals to replace EU funding with national funds to address structural and economic
imbalances and to aid the public and private sector in delivering transformational change in
communities. The delivery of the 3-year £12m UK Shared Prosperity Funding (UKSPF)
programme commenced in 2022. UK Government has confirmed additional funding for a
fourth year, 2025-26, and for the council this amounts to £4m compared to £7.1m in
2024/25.  Economic Development officers have worked with council services and external
partners on delivery of the UKSPF to maximise economic and community
outcomes.  Delivery of over 23 projects, over the term of the programme, across council
resources ranging from employability support to business grants and grants to communities,
is progressing and is reported quarterly to the UK Government through Glasgow City
Region. 
Levelling Up Fund 
Two projects have been awarded funding by the UK Government Levelling Up Fund.  These
are the Clydesdale Way (awarded £6.8 million of grant as part of the cross-council border
Three Rivers Active Tourism project) and Shawfield Remediation (awarded £14.6m) for
Clyde Gateway URC to progress decontamination and redevelopment of the Shawfield
area. These projects will be progressed in 2025-26, with completion in line with the
requirements set by the UK Government.
2.5. Glasgow City Region City Deal 
As part of the City Deal, the resource is leading the delivery of three major transportation
projects being undertaken to boost South Lanarkshire’s access to the rest of Scotland.  The
Cathkin Relief Road in Rutherglen / Cambuslang and the Greenhills Road project in East
Kilbride is complete. Proposals in relation to Stewartfield Way and East Kilbride Town
Centre are progressing well and being developed through the preparation of the Outline
Business Cases.   Other school and transportation projects are being progressed by the
resource in support of the various Community Growth Areas across South Lanarkshire.
2.6. Deliver effective Employability Services to support Individuals and
Business 
South Lanarkshire Works will continue to deliver a range of employability programmes to
meet the needs of key priority groups and employers and support South Lanarkshire
residents into sustainable employment. 
A key focus of the 2025-26 Annual Investment Plan, which is developed and agreed with
the South Lanarkshire Employability Partnership (SLEP), is to increase the availability of
specialist employability support to participants with learning disabilities and other long-term
health conditions. Specialist employability support involves long-term and intensive
keyworker-based support, with significant in-work aftercare to support sustainable
employment outcomes. 
The Annual Investment Plan will continue to include support for parents to progress to
employment as a key priority. The Supporting Families approach, which involves working
in partnership with primary schools and early years centres to identify and support socially
excluded parents, will be rolled out across South Lanarkshire to support progressions to
employment.  
42

Page 43

7 
2.7. Sustainable Development and Climate Change (SDCC) 
The council acknowledges the serious and immediate threat of climate change and is
committed to accelerating the pace of action in response to the climate emergency and in
Scotland’s transition to a net-zero and climate resilient society and economy.  It is expected
that, as a public body, the council leads by example and uses its role to influence area-wide
climate change action and sustainability.  The Sustainable Development and Climate
Change Strategy 2022 – 2027 and action plan sets out how the council aims to develop
sustainably and tackle climate change.  The council supports the delivery of Climate Ready
Clyde’s Adaptation Strategy and action plan which seeks to transform Glasgow City region
to adapt to the climate challenge and ensure everyone benefits from doing so. The council
is also responsible for submitting annual Public Bodies Climate Change Duties reporting,
which details progress made by the council in delivering against its duties, as set out in the
Climate Change (Scotland) Act 2009. 
The inability to take the necessary action - due to funding constraints - to combat climate
change and work toward achieving net zero carbon emissions by 2045 (thereby contributing
to negative and irreversible environmental, social and economic impacts on the council and
its residents) is a top risk for the council.  Sustainable development and climate change
work carried out by the council seeks to mitigate this risk. 
2.8. Circular Economy 
The Circular Economy (Scotland) Act 2024 sets out requirements for the following: a
Circular Economy Strategy; Circular Economy targets; legislation aimed at reducing waste;
increases in penalties for littering from vehicles; legislation to enhance duty of care
responsibilities for households and businesses; and legislation to improve waste monitoring.
These measures will underpin and complement Scotland’s Circular Economy and Waste
Route Map. The route map will set out the strategic direction for waste management in
Scotland until 2030, based on responsible production, responsible consumption, and
maximising value from waste and energy. 
2.9. Local Transport Strategy (LTS)
Consultation on the draft LTS is currently being scheduled for Spring 2025, with the finalised
draft document being presented to Committee for approval after the summer recess.
Policies and actions are drafted taking cognisance of the Regional and National Transport
Strategies. 
The new Local Transport Strategy will be an ambitious and forward-thinking strategy that
sets out a strategic vision and objectives, alongside proposals for a ten-year Action Plan.  It
will be used to guide the transport actions and priorities of the council and will also be used
to influence the actions of a range of partner organisations who deliver aspects of transport
within South Lanarkshire. 
Main themes of the strategy will include reference to maintenance and asset management,
road safety, the economy, sustainable and public transport, the environment, inclusive
mobility, spatial planning as well as the use of technology.  Plans for implementation of
actions and monitoring will also be included. 
Strathclyde Partnership for Transport (SPT) have recently published their Regional
Transport Strategy.  Several themes are highlighted relating to public transport, managing
travel needs, active travel, integration of travel, road safety, sustainable travel, climate
resilience, environment and connecting places. 
43

Page 44

8 
This also links with the National Transport Strategy which sets outs various priorities and
themes.  These priorities look to reduce inequalities, take climate action, help deliver
inclusive economic growth and improve our health and wellbeing, as well as those relating
to public transport, managing travel needs, active travel, integration of travel, road safety,
sustainable travel, climate resilience, environment and connecting places.  
2.10. Health and Wellbeing 
This is a cross-cutting theme within Community and Enterprise Resources and covers a
wide range of activities, from promoting healthy eating (via the provision of school meals),
to the positive contribution that our partner, SLLC, makes in ensuring inclusive access to
sport, leisure and culture across our communities.   Community and Enterprise Resources
will assist SLLC in the provision of these services by continuing to oversee capital
investment in the council’s leisure and culture facilities: the new build of Larkhall Leisure
Centre over the next three years will be a major project for the Resource, as will be the
implementation of the council’s £13m Leisure and Culture Transformation Fund which will
help modernise the leisure and culture estate, optimise use of the leisure and culture assets
and assist in the transition towards net zero.  The environmental health service promotes
health protection practices and regulates public health across South Lanarkshire.
2.11. Free School Meals Roll Out 
The Scottish Government is committed to extending free school meal provision to pupils in
P6 and P7, with stage 1 extending free school meals to those pupils in P6 and P7 in
receipt of the Scottish Children payment.  There will be a phased roll out of free school
meals to children and young people in primary 6 and 7 who are in receipt of the Scottish
Child Payment beginning in February 2025 to be completed by August 2026. It is unlikely
the roll out to remaining P6 and P7 pupils will be completed in this parliamentary term due
to financial uncertainty.   
3.0. Legislative and Policy Changes 
New and revised legislation will also impact on the work of the resource during 2025-26,
including: 
• Climate Change Act (2019) – Whilst not new legislation, the Climate Change Act
(2019) continues to impact on the council’s activities and commits Scotland to net-zero
greenhouse gas emissions by 2045.  The Climate Change (Scotland) Act states that a
public body must:
− contribute to the delivery of Scotland’s national emissions reduction targets
− help deliver Scotland’s statutory climate change adaptation programme, and
− act in a way that it considers is most sustainable       
On 5 September 2024, the Scottish Government introduced the Climate Change 
(Emissions Reduction Targets) (Scotland) Bill which replaced the interim and   
annual targets previously set out in the Climate Change (Scotland) Act 2009.  The Bill 
replaces those targets with a system of targets based on carbon budgets. 
Scottish Ministers will need to set carbon budgets so that every year between 2026 and
the net-zero emissions target year (2045) is covered by a budget. Each carbon budget
will cover a period of five years and will set out the amount of greenhouse gas
emissions allowed during that period. The Bill also changes the deadline for the first
Climate Change Plan. This Plan must be laid before the Parliament as soon as possible
after the first carbon budgets have been set.
44

Page 45

9 
Transport (Scotland) Act 2019 This act is designed to help make Scotland’s transport
network cleaner, smarter and more accessible. The Act deals with a number of issues including,
Prohibition of Pavement Parking, Bus Services, Roadworks, Workplace Parking and Low
Emission Zones.  
• Pavement Parking A key provision of the Act is to prohibit the parking of vehicles on
pavements, prohibit double parking and prohibit parking adjacent to dropped
footways.  The council commencement enforcement of pavement parking in January
2025 which will be balanced, proportionate and pragmatic a “soft” behavioural change
approach with a complementary communications campaign. 
• Bus Services The Act provides local transport authorities with powers to make bus
travel more attractive, allowing local transport authorities to run their own bus services;
franchise bus services in their areas; or enter into Bus Services Improvement
Partnerships (BSIPs) with bus operators within their areas. The Act also introduces new
regulations covering the way in which bus operators must provide information to local
authorities when they plan to reduce or withdraw the services they provide.  Strathclyde
Partnership for Transport (SPT) are currently drafting their Regional Bus Strategy and
considering next steps in terms of franchising. On completion, this will allow
consideration of what opportunities there are for these types of measures as well as
the Act’s other section which relates to smart ticketing options. These provisions will
have significant employee and financial resourcing issues.
• Road Works The Act seeks to continually encourage a raise in standards to improve
the quality of road works.  The key provisions include: additional powers given to the
Scottish Road Works Commissioner to strengthen enforcement on non-compliance of
legislation in relation to road works with the use of fines and monitoring; a requirement
for all undertakers to have a Reinstatement Quality Plan (RQP) in place; and a revised
timescale for notifying within 2 hours of the commencement and completion of works.
A revised Specification for the Reinstatement of Opening in Roads (SROR) is also now
in force, increasing the guarantee period for the majority of asphalt reinstatements to 6
years.  It should also be noted that the Commissioner has increased on site monitoring
through the introduction of several compliance officers who will be undertaking drive by
observations, with a particular focus on roads authorities in the first instance.
• 20mph speed limits Scotland’s Road Safety Framework to 2030 is committed to
creating a safer, healthier and greener Scotland. It is the council’s aspiration to
introduce mandatory 20mph speed limits within residential areas in line with the new
Scottish Government policy. A review of an assessment study of approximately 6,000
streets is ongoing and the outcome will shape the delivery of 20mph speed limits across
South Lanarkshire.  Significant resources will be required for the promotion of
associated traffic regulation orders and signage.
• Other impacts The Transport (Scotland) Act 2019 also enables local authorities to
manage vehicle emissions via the establishment of Low Emission Zones (LEZ) and
introduce Workplace Parking Charges to influence travel behaviour. However, there
are no plans at this time to introduce these in South Lanarkshire. 
45

Page 46

10 
Section Three – Resource Outcomes
3.1. Resource Outcomes
Community and Enterprise Resources has established the following Resource outcomes
to support the delivery of Connect Outcomes in 2025-26. 
Connect
Outcomes
Resource Outcomes  
Communities and
Environment 
• High-quality streets, parks and other public areas ensures South
Lanarkshire is a place where people want to live, work, visit and invest
• Communities are encouraged and supported to reduce, re-use and recycle
their waste
• The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate
change, and acting sustainably
• Communities are well connected 
• All roads, footways, cycle routes, bridges and associated infrastructure are
safe and fit for purpose
• Road and transportation infrastructure supports new development, enables
use of public transport and encourages active travel
Education and
Learning 
• No resource outcomes for this Connect outcome 
Health and
Wellbeing 
• Public health is safeguarded through an effective environmental regulation
and enforcement service
• All school and nursery children have access to nutritious school meals 
• All residents have the opportunity to access cultural, leisure and outdoor
recreational activities to help improve their wellbeing and quality of life
Children and
Young People 
• No resource outcomes for this Connect outcome 
Housing and
Land 
• Vacant, derelict and contaminated land is brought back into productive use
• Appropriate supply of housing land (including affordable housing) is
maintained
Our Economy  • South Lanarkshire is an attractive place to start, grow and locate a business
• Economic development and growth in South Lanarkshire is fair, inclusive,
sustainable and low carbon
• Thriving town and neighbourhood centres provide a focal point for local
communities 
• Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth  
• A people-centred approach to recovery is implemented to help individuals,
communities, businesses and the social and third-party sector thrive 
46

Page 47

11 
3.2. Delivering the Plan and achieving Best Value
In working towards the six Outcomes, the council will continually improve and ensure
effective and efficient use of resources, and our business will be conducted with integrity,
transparency and will operate to the highest standards. 
Community and Enterprise Resources has established the following Resource Outcomes
to support Delivering the Plan and achieving Best Value. 
Delivering the
Plan and
achieving Best
Value
Resource Outcomes
• Customers experience high quality and improving council services 
47

Page 48

12 
Section Four – Measures and actions 
4.0. Performance measures and action plan 
This section of the Resource Plan is divided into two parts: part (a) sets out our main
performance measures against our outcomes; and part (b) describes the key actions we
will take in the coming year to respond to the challenges ahead and improve services and
outcomes.
4.a. How we will measure our performance
The impact of COVID-19 continues to have an effect on performance of some services. The
table below shows our performance measures, and includes the actual data last reported
to Committee and the targets for both the last financial year and 2025-26.  Additional context
for the results/targets is provided within the notes column, where applicable. 
Measure 2023-24
Actual
2024-25 
Target
2025-26
Target
Links Service Notes
1. Percentage of
streets found to
be acceptable
during Litter
Monitoring
System surveys.
(Locally set
target)
92% >92% >92% 01.09 Facilities,
Waste and
Grounds 
2. Land Audit
Management
System grounds
maintenance
score.     
(Locally set
target) 
72.0 72.0 72.0 C01.09 Facilities,
Waste and
Grounds
72 is still a
challenging
target score
that the
Service strives
to meet 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
3. Percentage of
total household
waste that is
recycled in the
calendar year
2025.
(Locally set
target)
43.75%
(2023)
50% >50% C01.14 Facilities,
Waste and
Grounds
Connect
measure
therefore
target remains
at 50%  
Resource Outcome: High-quality streets, parks and other public areas ensures South Lanarkshire
is a place where people want to live, work, visit and invest
Resource Outcome:  Communities are encouraged and supported to reduce, re-use and recycle
their waste
48

Page 49

13 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
4. Percentage of
household waste
sent to landfill in
the calendar year
2025.
(Locally set
target)
1.50%
(2023)
<5% <5% C01.06 Facilities,
Waste and
Grounds
Target to
remain at <5%
this is the
contract target 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
5. Reduction in the
council’s carbon
emissions
(buildings,
waste, transport
etc.) 
9.46% Reduce
emissions
compared
to
previous
year
Reduce
emissions
compared
to
previous
year
C01.13 Enterprise
and
Sustainable
Development
Carbon
emissions are
reported a
year behind. In
2025-26, we
will report on
2024-25 actual
figure
compared to
2023-24 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
6. Percentage of
properties with
Superfast
Broadband
>30Mbps.     
(Locally set
target)
97.9% 99% 99% C01.07 Enterprise
and
Sustainable
Development 
7. Percentage of
properties with
Full Fibre
connection. 
(Locally set
target)
45.4% 52% 60% C01.07 Enterprise
and
Sustainable
Development 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
8. Percentage of
our road network
that should be
considered for
maintenance
31.9%
(2022-
2024)
<31.9% Lower
than the
2024-25
figure
C01.10 Roads,
Transportation
and Fleet 
Resource Outcome:  The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate change, and acting sustainably
Resource Outcome:  Communities are well connected
Resource Outcome: All roads, footways, cycle routes, bridges and associated infrastructure are safe
and fit for purpose
49

Page 50

14 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
treatment (Roads
Condition Index)
(Locally set
target)
9. Percentage of A
class roads that
should be
considered for
maintenance
treatment (Roads
Condition Index) 
24.9%
(2022-
2024)
<24.9% Lower
than the
2024-25
figure
C01.10 Roads,
Transportation
and Fleet 
10. Percentage of B
class roads that
should be
considered for
maintenance
treatment (Roads
Condition Index) 
27.8%
(2022-
2024)
<27.8% Lower
than the
2024-25
figure
C01.10 Roads,
Transportation
and Fleet 
11. Percentage of C
class roads that
should be
considered for
maintenance
treatment (Roads
Condition Index) 
36.5%
(2022-
2024)
<36.5% Lower
than the
2024-25
figure
C01.10 Roads,
Transportation
and Fleet 
12. Percentage of U
class roads that
should be
considered for
maintenance
treatment (Roads
Condition Index) 
32.6%
(2022-
2024)
<32.6% Lower
than the
2024-25
figure
C01.10 Roads,
Transportation
and Fleet 
13. Number of road
casualties in
South
Lanarkshire
during 2025.
(Locally set
target)
370
(2023)
<370 Lower
than the
2024-25
figure
C01.01 Roads,
Transportation
and Fleet 
50

Page 51

15 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
14. Broad
compliance with
food law statutory
requirements
secured in
premises.
(Locally set
target)
95.0% 85.0% 85.0% C01.11 Planning and
Regulatory
Services
Target to remain
at 85% since the
council is not in
direct control of
the measure.
Compliance is
the
responsibility of
the business 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
15. Level of primary
school meal
uptake (as
proportion of total
primary school
meals which could
be taken up over
the period).     
(Locally set target)
69.2% 66% 66% 03.03 Facilities,
Waste and
Grounds
Target of 66%
remains
challenging
16. Level of secondary
school meal
uptake (as
proportion of total
secondary school
meals which could
be taken up over
the period).     
(Locally set target)
39.9% 38% 38%  03.03 Facilities,
Waste and
Grounds
Target of 38%
remains
challenging 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
17. Delivery of UK
Shared Prosperity
Program      
£3.489m £6m £4m 07.02 Enterprise
and
Sustainable
Development 
Resource Outcome:  Public health is safeguarded through an effective environmental regulation and
enforcement service
Resource Outcome: All school and nursery children have access to nutritious school meals 
Resource Outcome: Economic development and growth in South Lanarkshire is fair, inclusive,
sustainable and low carbon
51

Page 52

16 
Measure 2023-24
Actual
2024-25
Target
2025-26
Target
Links Service Notes
18. Percentage of
procurement
spend on local
enterprises 
18% More
than
previous
year
More than
previous
year
C06.11 Enterprise
and
Sustainable
Development
LGBF measure 
Measure 2023-24
Actual
2024-25 
Target
2025-26 
Target
Links Service Notes
19. Number of
participants
supported via
council-operated
employability
programmes (local
target)
2,663
People
1,500
people
1,500
people
C06.01 Enterprise
and
Sustainable
Development 
20. Number of
participants
gaining
sustainable
employment (local
target)
643
People
700
people
700
people
C06.13 Enterprise
and
Sustainable
Development 
21. Number of
participants
accessing further
education or
training (local
target)
870
people
400
people
400
people
C06.02 Enterprise
and
Sustainable
Development 
Resource Outcome: A people-centred approach to recovery is implemented to help individuals,
communities, businesses and the social and third sector thrives.
Resource Outcome: South Lanarkshire is an attractive place to start, grow and locate a business
52

Page 53

17 
4.b What actions we will take in 2025-26 
Action  Milestones/steps we will take to deliver
our actions Links Service
1. Prepare an Open Space
Strategy
Present a draft Open Space Strategy to
Planning Committee by end of September
2025
C01.09 Planning and
Regulatory
Services
Carry out statutory consultation on the
draft Open Space Strategy in November
2025
C01.09 Planning and
Regulatory
Services
Final approval of the Open Space Strategy
by June 2026
C01.09 Planning and
Regulatory
Services
2. Make South Lanarkshire a
cleaner place to live, work
and visit free of letter, fly-
tipping and dog waste
Prepare an annual progress report for
Climate Change and Sustainability
Committee in December 2025,
demonstrating the impact of the Litter
Strategy (2022-2027)
01.09 Facilities,
Waste and
Grounds 
Action  Milestones/steps we will take to deliver
our actions Links Service
3. Support a circular economy by
re-using, recycling and
generating energy from the
waste we manage
Complete the review of waste services
taking into consideration that the Deposit
Return Scheme (DRS) has been
postponed until October 2027 and the
outcome of the Circular Economy Bill
consultation
01.06 Facilities,
Waste and
Grounds 
Action  Milestones/steps we will take to deliver
our actions Links Service
4. Lead by example and
influence area-wide climate
change and sustainability
action 
Implement the Sustainable Development
and Climate Change Strategy (2022-2027)
Action Plan, and report progress at quarter
two and quarter four to Climate Change
and Sustainability Committee
C01.08 Enterprise and
Sustainable
Development
5. Submit annual Public Bodies
Climate Change Duties
(PBCCD) Report to the
Scottish Government
Completion and submission of the PBCCD
report by 30 November 2025
01.08 Enterprise and
Sustainable
Development
6. Modernise and decarbonise
the council’s fleet 
Review and produce a revised Fleet
Strategy (2025-2030) and Action Plan
01.13 Roads,
Transportation
and Fleet 
Resource Outcome: High-quality streets, parks and other public areas ensures South Lanarkshire is a
place where people want to live, work, visit and invest
Resource Outcome: Communities are encouraged and supported to reduce, re-use and recycle their
waste
Resource Outcome: The council addresses climate change by reducing carbon emissions, protecting
our natural environment, adapting to the impacts of climate change, and acting sustainably
53

Page 54

18 
Action  Milestones/steps we will take to deliver
our actions Links Service
7. Deliver new and improved
low carbon vehicle charging
infrastructure
Maintain, manage and expand public
infrastructure points / hubs in line with
available internal and external funding
sources
01.13 Roads,
Transportation
and Fleet 
8. Ensure national planning
policy set out in National
Planning Framework 4 in
relation to climate change,
biodiversity and sustainable
travel is embedded in
decision making process for
planning applications and the
preparation of the South
Lanarkshire Local
Development Plan 3
Gather and assess data on these topics
for inclusion in the Evidence Report for
LDP3 and to aid decision making. The
Evidence report to be presented to Full
Council by September 2025
01.09 Planning and
Regulatory
Services 
Action  Milestones/steps we will take to deliver
our actions Links Service
9. Prepare prioritised
programme of carriageway
and footway maintenance
works 
Deliver a programme of carriageway and
footway projects in line with agreed 2025-26
funding 
01.01 Roads,
Transportation
and Fleet 
10. Prepare prioritised
programme of bridge and
structure maintenance works
Deliver a programme of bridge and other
structures projects in line with agreed 2025-
26 funding
01.01 Roads,
Transportation
and Fleet
11. Prepare prioritised
programme of traffic signal
and pedestrian/ cycle
crossing maintenance works
Deliver a programme of traffic signal and
pedestrian / cycle crossing upgrade projects
in line with agreed 2025-26 funding
01.01 Roads,
Transportation
and Fleet
12. Deliver winter maintenance
carriageway and footway
gritting actions during
inclement weather
During adverse weather, undertake
appropriate precautionary actions and
during severe weather ensure main,
secondary and extreme routes are treated
as necessary
01.01 Roads,
Transportation
and Fleet
13. Deliver prioritised road
safety infrastructure
improvements and promote
road safety
Deliver road safety projects and schemes in
line with agreed 2025-26 programme
01.01 Roads,
Transportation
and Fleet 
Action  Milestones/steps we will take to deliver
our actions Links Service
14. Launch and promote the
Local Transport Strategy
for South Lanarkshire 
Launch and promote the new Local
Transport Strategy to Elected Members,
partners and stakeholders by the end of
2025
C01.10 Roads,
Transportation
and Fleet 
Resource Outcome: Road and transportation infrastructure supports new development, enables use of
public transport and encourages active travel
Resource Outcome: All roads, footways, cycle routes, bridges and associated infrastructure are safe
and fit for purpose
54

Page 55

19 
Action  Milestones/steps we will take to deliver
our actions Links Service
15. Deliver road and
transportation
infrastructure
improvements to support
new developments,
including those
undertaken as part of the
City Deal
Progress the Stewartfield Way Sustainable
Transport Capacity Enhancements Project
in line with the agreed programme 
C01.10 Roads,
Transportation
and Fleet   
16. Encourage greater use of
public transport by
working with partners to
improve public transport
infrastructure
Deliver prioritised improvements to bus and
rail infrastructure in line with available
external funding for 2025-26 
C01.10 Roads,
Transportation
and Fleet   
Deliver and complete the park and ride
infrastructure associated with the new
Hairmyres Transport Interchange by
September 2025
01.10 Roads,
Transportation
and Fleet   
17. Encourage active travel by
extending our network of
walking and cycling routes 
Deliver walking and cycling projects/
schemes in line with agreed 2025-26 capital
programme 
01.10 Roads,
Transportation
and Fleet   
Action  Milestones/steps we will take to deliver
our actions Links Service
18. Complete the roll out of
free school meals to all
primary children
Implement the roll out of further expansion
of free school meals to Primary 6 and
primary 7 pupils in receipt of the Scottish
Child Payment from February 2025
C03.03 Facilities,
Waste and
Grounds 
Action  Milestones/steps we will take to deliver
our actions Links Service
19. Work in partnership with
South Lanarkshire Leisure
and Culture (SLLC) to
maintain and deliver
community facilities
Continue to review leisure and culture
community facilities, maintaining and
improving them through the Capital
Programme and Transformational Fund
03.03 Enterprise
and
Sustainable
Development
20. Improve health and
wellbeing by offering
attractive and affordable
leisure and cultural
activities delivered with
warmth, friendliness and
individual pride
Develop a new outcome focused
performance management framework
aligned with the SLLC Commissioning
Plan, and present reports to Committee for
monitoring
03.03 Enterprise
and
Sustainable
Development
21. Implement the multi-year
Play Area Investment
Programme
Complete investment programme in the
Hamilton area and begin consultation in
East Kilbride
03.03 Facilities,
Waste and
Grounds
Resource Outcome: All school and nursery children have access to nutritious school meals 
Resource Outcome: All residents have the opportunity to access cultural, leisure and outdoor
recreational activities to help improve their wellbeing and quality of life
55

Page 56

20 
Action  Milestones/steps we will take to deliver
our actions Links Service
22. Deliver effective
Employability Services to
support individuals and
business
Monitor and adjust the delivery plan
agreed via the South Lanarkshire Local
Employability Partnership (SLLEP) and
Community Planning Partners 
06.01 Enterprise
and
Sustainable
Development 
Action  Milestones/steps we will take to deliver
our actions Links Service
23. Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the
Vacant and Derelict Land Fund framework
agreed for 2025-26
C05.04 Enterprise
and
Sustainable
Development 
Action  Milestones/steps we will take to deliver
our actions Links Service
24. Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate, whilst
creating the right
conditions for low carbon
economic growth
Deliver programmes, services, and events
to businesses around sectors, location,
and themes (e.g., food and drink, tourism,
construction, low carbon, innovation,
internationalisation, collaboration, and
young enterprise)
C06.03 Enterprise
and
Sustainable
Development
Support and host the Supplier
Development Programme to deliver
events, training and e-commerce support
to SME’s or third sector organisations who
are interested in working with the public
sector
06.09 Enterprise
and
Sustainable
Development
Work with Business Gateway (BG) to
deliver on the revised Business Gateway
delivery targets providing an annual
progress report to Community and
Enterprise Committee in August 2025
C06.08 Enterprise
and
Sustainable
Development 
Action  Milestones/steps we will take to deliver
our actions Links Service
25. Promote sustainable
economic development
across South Lanarkshire 
Prepare an annual progress report for
Community and Enterprise Resources
Committee, demonstrating the impact of
the South Lanarkshire Economic Strategy
(2022-2027)
C06.05 Enterprise
and
Sustainable
Development
Resource Outcome: Vacant, derelict and contaminated land is brought back into productive use 
Resource Outcome: South Lanarkshire is an attractive place to start, grow and locate a business 
Resource Outcome: Economic development and growth in South Lanarkshire is fair, inclusive,
sustainable and low carbon
Resource Outcome: A people-centred approach to recovery is implemented to help individuals,
communities, businesses and the social and third-party sector thrives 
56

Page 57

21 
Action  Milestones/steps we will take to deliver
our actions Links Service
26. Deliver the Levelling Up
Funded projects 
Delivery of the Levelling Up Fund grant
funded projects through the Clydesdale
Way and Shawfield Remediation, £14.6m
funding from 2025/26, completion in line
with the requirements set by the UK
Government
C06.05 Enterprise
and
Sustainable
Development
27. Positively enhance the
benefits of tourism across
South Lanarkshire by
delivering the very best for
our visitors, our
businesses, our people,
our communities, and our
environment
Prepare an annual progress report for
Community and Enterprise Resources
Committee, demonstrating the impact of
South Lanarkshire Tourism Strategy
(2022-2025)
06.06 Enterprise
and
Sustainable
Development
28. Income generating
projects will be scoped
across all council
resources to identify
viable projects with a
focus on green initiatives
including exploring
options for delivery and
funding
Liaise with all council resources, third
parties and funders to identify new
opportunities for generating income and
consider a risk analysis of each
opportunity  
06.05 Enterprise
and
Sustainable
Development
29. Develop single door
approach to economic
development and inward
investment activity which
links employment, skills,
business support and
planning
Undertake activity (i.e. Lanarkshire
Business Events website / supports to
national themed weeks aimed at
increasing the number of companies
engaged with partners) which lead to
improved performance and turnover,
increased employment, innovation,
investment and internationalisation
06.05 Enterprise
and
Sustainable
Development 
30. Delivery of the Rural
Action Plan maximising
existing and future funding
through Community Led
Local Development and
Renewable Energy Fund 
Deliver the Rural Action Plan and report
on progress to the Rural Task Force in
February 2025 
C05.13 Enterprise
and
Sustainable
Development 
57

Page 58

22 
Action  Milestones/steps we will take to deliver
our actions Links Service
31. Implement the delivery of
the approved of the East
Kilbride Town Centre
masterplan, working
through the agreed
project management
schedule to secure a
planned and managed
transfer of the town
centre and effective
delivery of the key
components of the
masterplan
Deliver the project management schedule,
including the transfer of ownership,
demolition strategy, design development,
and legal agreements and approvals
within the agreed timescales 
C06.04 Enterprise
and
Sustainable
Development
32. Implement the delivery of
the approved Hamilton
Town Centre masterplan
and deliver initial actions
to enable the delivery of
key projects
Deliver the agreed projects schedule to
secure effective delivery of the key
components of the masterplan to help
secure change within agreed timescales 
C06.04 Enterprise
and
Sustainable
Development 
33. Preparation of South
Lanarkshire Local
Development Plan 3
(LDP3)
Start work on the proposed plan,
anticipated adoption in late 2027, prepare
the first phase Evidence Report and
submit to Scottish Ministers for Gatecheck
by September 2025 and continued
engagement and consultation in
accordance with the Participation
Statement in the Council’s approved
Development Plan Scheme
01.08 Planning and
Regulatory
Services 
Action  Milestones/steps we will take to deliver
our actions Links Service
34. Implement the Frontline
First Fund
Identify and implement a programme of
projects to deliver the Frontline First Fund
07.01 Facilities,
Waste and
Grounds 
Resource Outcome: Thriving town and neighbourhood centres provide a focal point for local
communities
Resource Outcome: Customers experience high quality and improving council services
Resource Outcome: Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth
58

Page 59

23 
Section Five – Resourcing the Plan
5.0. Introduction 
In this section we consider the resources needed to implement our plan, including funding
and staffing. 
5.1. Revenue Budget 2025-26
The resource has a Net Revenue Budget of £127,681 million. The table below allocates
this budget across the services:
. 
Net Budget by Service 2025-26 £ million %
Facilities, Waste, and Grounds 79.114 62
Roads, Transportation and Fleet 18.169 14.2
Planning and Regulatory Services  4.786 3.7
Enterprise and Sustainable Development 5.824 4.6
South Lanarkshire Leisure and Culture Ltd 19.788 15.5
Detail 127.681 100
5.2.  Capital Budget 2025-26 
The following capital budget of £49.222 million is allocated: 
Capital Programme 2025-26 Project  £ million
Facilities, Waste, and Grounds 1.893
Roads, Transportation and Fleet 14.655
Planning and Regulatory Services   0
Enterprise and Sustainable Development  32.674
Total 49.222 
59

Page 60

24 
5.3. Resource Employees
Community and Enterprise Resources has 3,415 employees, as at 31 January 2025. We
support these employees to deliver their duties through a range of policies, including
personal appraisal and a robust training framework. 
The number of employees by service is as follows: 
Service Number of
employees
Facilities, Waste, and Grounds 2,615
Roads, Transportation and Fleet 480
Planning and Regulatory Services  138
Enterprise and Sustainable Development 182
Total 3,415 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. Phone 0303 123 1015 or email equalities@southlanarkshire.gov.uk 
60

Page 61

Report
Agenda Item 
Report to:  Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Employability – Annual Investment Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 present the Employability Annual Investment Plan 2025/2026 for approval and
seek approval to enter into agreements with colleges 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
]
(1) that the 2025/2026 Annual Investment Plan is approved;
(2) that the proposal to develop a consortium agreement with South Lanarkshire
College and New College Lanarkshire for the delivery of the 2025/2026
Foundation Apprenticeship programme is approved; and
(3) that the proposal to develop partnership agreements with South Lanarkshire
College, New College Lanarkshire, and Glasgow Kelvin College for the delivery
of GradU8 for the 2025/2026 academic year is approved.
1ecs]
3. Background
3.1. The Council delivers and funds a range of employability programmes designed to help
local residents experiencing barriers to employment to progress to sustainable
destinations of employment or further learning. These programmes are funded by a
blend of external funding sources supported by core Council budgets. External funding
for 2025/2026 includes Scottish Government No-one Left Behind, UK Government
Shared Prosperity Fund and windfarm community benefit funding. 
3.2. As a condition of the Scottish Government No-one Left Behind (NOLB) grant, local
authorities are required to submit an Annual Investment Plan (AIP) which sets out the
Council’s plans for the delivery of all employability programmes including those funded
by non-Scottish Government funding streams. These plans are required to be
developed and agreed with partners through Local Employability Partnerships (LEPs). 
3.3. The 2025/26 plan was developed in partnership with the South Lanarkshire Local
Employability Partnership (SLLEP) and is attached at Appendix 1.  
7
61

Page 62

4. 2025/2026 No-one Left Behind Funding 
4.1. The Scottish Government No-one Left Behind grant sets out funding across three
funding priorities. For 2025/2026 the Scottish Government has introduced a new
funding priority of specialist employability support, which is designed to increase the
support available to people with long term barriers to employment such as learning
disabilities, health conditions or addictions. In South Lanarkshire, services of this kind
had been established during 2024/2025 through the intensive support programme
delivered by Routes to Work South and the in-house Supported Employment
programme.  
Table 1 – No-one Left Behind Funding 2025/2026  
All-age support £2,063,020
Parental Employability Support £2,336,000
Specialist Employability Support  £284,259
Total  £4,683,279 
4.2. The programmes are also supported by non-Scottish Government sources as set out
below to support a range of management and other non-delivery costs:- 
 UK Government Shared Prosperity Funding - £1,700,000
 Windfarm Community Benefit Funding – up to £500,000 (subject to agreement) 
5. Annual Investment Plan 
5.1. The 2025/2026 Annual Investment Plan sets out the SLLEP’s key priority groups,
keywork-based programmes and learning and training activity. The plan has been
designed around the Scottish Approach to Employability of:- 
 dignity and respect, fairness and equality and continuous improvement 
 flexible and person-centred support
 straightforward for people to navigate
 integrated and aligned with other services
 provides pathways into sustainable and fair work
 driven by evidence including data and the experience of users
 support more people to move into the right job at the right time 
5.2. The AIP sets out the partnership’s key priority groups. People from the groups below
requiring employability support will have access to a keywork-based service delivered
by either the Council, or Routes to Work South (RTWS), the Council’s arms-length
external organisation for the delivery of employability services. 
Table 2 – Key Priority Groups 
Key Priority Group                                                                                  Keyworker Service Funding 
Young people aged 15-19
(including in last 6 months
of school)
Aspire (SLC) NOLB all-age support /
Shared Prosperity Funds
Adults with barriers to
employment
Gateway to
Employment (RTWS)
NOLB all-age support /
Shared Prosperity Funds 
Adults with long term health
barriers to employment
Gateway to
Employment -
Intensive (RTWS)        
NOLB Specialist
Employability Support
62

Page 63

Adults and young people
with learning disabilities                  
Supported
Employment (Soth
Lanarkshire Council
(SLC))
NOLB - Specialist
Employability Support
Unemployed or low waged
parents 
Supporting Families
(SLC)
Making it Work
(RTWS)
Specialist Employability
Support
Kype Muir and Middle Muir
windfarm communities 
Enhanced
employability support
and funding 
Connect 2 Renewables 
5.3. All participants engaging on the programmes above have an identified keyworker
responsible for supporting them through an individual flexible action plan. For many
participants their action plan will include access to a range of SLLEP funded provision
as set out below. 
Table 3 – Learning / Training Provision 
RISE Employability Groupwork programme targeted at young people
in the last 6 months of school delivered by RTWS 
REACH /
IMPACT 
Employability Groupwork programme for young people aged
16 to 19, delivered by RTWS
Supported
Volunteering
VASLAN will work with local 3rd sector organisations to provide
supported volunteering placements for participants 
Employability
Academy
A range of vocational/accredited training courses delivered by
South Lanarkshire College
Money / Benefits
Advice
Dedicated Money Advice service for employability participants
through the Money Matters team
Health and
Wellbeing
South Lanarkshire Leisure will provide a range of activities to
support participants wellbeing in response to need
Demonstrator Waged placements for parents across NHS, SLC and the
State Hospital
Project Search One-year work placement for Supported Employment
participants delivered in partnership with NHS Lanarkshire and
New College Lanarkshire 
5.4. Participants can also access direct financial support when engaged on programmes
including expenses, training allowances and funding to support training where it can
be clearly demonstrated that it will lead to employment.  
5.5. The provision above will be enhanced by the delivery of a range of externally procured
provision which will be agreed through the SLLEP on an ongoing basis in response to
need. This is likely to include sector-based training and activity to address specific
needs identified across caseloads. In 2024/2025 provision included construction
training, vocational tasters, a rail skills academy, Construction Skills Certification
Scheme (CSCS) card training, and an online confidence building programme. 
63

Page 64

6. Foundation Apprenticeship and GradU8 Programmes 
6.1. Foundation Apprenticeships (FAs) are a national senior phase option, funded by Skills
Development Scotland (SDS) and the Scottish Funding Council (SFC) and designed
to allow pupils in S5-S6 to gain valuable, real-world work experience and access to
work-based learning while they are at school. Pupils attend college and work
placements up to 2 days a week while at school and the qualification achieved is
delivered at level 6 of the Scottish Credit and Qualifications Framework (SCQF). 
6.2. South Lanarkshire’s FA programme is delivered as a partnership between the Council,
South Lanarkshire College and New College Lanarkshire with the colleges delivering
the learning element and the Council managing the overall programme including pupil
support, compliance, transport and work placements.   
6.3. The programme is funded through a blend of SFC credits and the Council’s SDS
contract through a consortium agreement. SDS have confirmed contract levels for
academic year 2025/2026 and approval is sought to develop a consortium agreement
with South Lanarkshire College and New College Lanarkshire for the delivery of the
2025/2026 programme. 
6.4. GradU8 is a work-based learning option available to South Lanarkshire pupils in the
senior phase (S4-S6) of secondary school at SCQF level 4 or 5. The programme is
delivered in partnership with South Lanarkshire College, New College Lanarkshire and
Glasgow Kelvin College with pupils attending one-day a week to engage in one of 12
subject options. 
6.5. The programme is supported by a mix of funding which is set out in a partnership
agreement between the Council and each of the colleges. Funded elements include
Scottish Funding Council credits which pay for the learning and teaching element of
the programme, core Council budgets which include the provision of staffing support
and transport costs. Approval is sought for the development of partnership agreements
with South Lanarkshire College, New College Lanarkshire, and Glasgow Kelvin
College for the delivery of GradU8 for the 2025/2026 academic year. 
7. Employee Implications
7.1. There are 78 employees in the Employability Service. External funding will support 70
of these posts with the remainder engaged on school age programmes which are not
eligible for external funding.  All employees have permanency rights with the Council. 
7.2. No-one Left Behind funding also supports 4 employees within Finance and Corporate
Resources to support the provision of money advice and statistical support to the
employability partnership. 
7.3. A recruitment exercise is planned to fill existing vacancies and additional posts
approved by Community and Enterprise Committee in September 2024 to add
capacity to the delivery of specialist employee support and parental employability.
Subject to successful recruitment this will increase the establishment to 86. 
64

Page 65

8. Financial Implications
8.1. The Annual Investment Plan sets out spending plans for 2025/2026 with a total budget
of £7,367,930 as set out below. Scottish and UK Government funding is in place until
31 March 2026. 
Table 4 – Annual Investment Plan funding 
Scottish Government NOLB £4,683,430
UK Government SPF  £1,700,000
Connect 2 Renewables (TBC) £500,000
SLC Core funding £484,500
Total  £7,367,930 
8.2. The Foundation Apprenticeship programme is funded through a grant from Skills
Development programme. As the programme can be delivered over 2 academic years
the grant covers 2025 to 2027 with a total value of £693,698. This funding supports 3
employees within the employability service with the remainder allocated to learning
and teaching through the colleges and transport. 
9. Climate Change, Sustainability and Environmental Implications
9.1. There are no implications for climate change, sustainability or the environment in terms
of the information contained in this report. 
10. Other Implications
10.1.  The are no other implications arising from this report 
11. Integrated Impact Assessment and Consultation Requirements
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function or strategy and, therefore, no impact assessment is
required. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work to recover, progress and improve
 Our children and young people thrive
 Thriving business, fair jobs and vibrant town centres
 Inspiring learners, transforming learning, strengthening partnerships 
65

Page 66

Previous References
 None 
Background Papers
 None 
Contact for Further Information
If you would like further information, please contact: 
Douglas Hashagen – Employability Manager
Tel; 0141 584 2915
Email; douglas.hashagen@southlanarkshire.gov.uk
66

Page 67

South Lanarkshire Council Annual Investment Plan 2025/26         Appendix 1
Service Delivery 
What activity do you and your partners intend to deliver within this financial year
To provide flexible, person-centred
support under the No One Left Behind All
Age Employability Service – including
further information on specific groups
identified as a local priority
Specific groups i.e. Carers, Care Experienced, Veterans, Substance misuse, Criminal convictions
or could be specific sectors or age groups or sex. 
South Lanarkshire’s all-age employability service includes programmes funded by NOLB, Shared
Prosperity Fund and SLC core funding and has been agreed to target key priority groups below.
All participants engaging on LEP funded support have an identified keyworker responsible for
supporting them through an individual flexible action plan. Activity included in the plan may
include activity funded via the LEP or through other locally available provision and can include:
• One-to one support
• Confidence building
• Work placements. 
• Vocational tasters 
• Volunteering 
• Employability groupwork 
Key Priority Group                                                                                 Keyworker service
Adults with barriers to employment                                               Gateway to Employment (RTWS)
Adults with long term health barriers to employment            Gateway to Employment (Intensive)        
Adults and young people with learning disabilities                  Supported Employment (SLC)
Young people in the last 6 months of school                              Aspire (SLC)
Young people aged 16-19 with barriers to employment         AspireWorks (SLC) 
Keyworker supported participants can engage in a range of LEP funded provision. The following
are planned to be available across 2025/26 with further activity identified via the LEP’s
operational subgroup and procured via the SLC DPS / Framework. 
LEP Provision
RISE (Routes to Work South) – Employability Groupwork programme targeted at young people in
the last 6 months of school. 
REACH / IMPACT (RTWS) – Employability Groupwork programme for young people who have left
school age 16/17.  
7
67

Page 68

South Lanarkshire College Employability Academy – a range of vocational/accredited training
courses participants can undertake; all delivery is agreed via the LEP Operational Subgroup. 
Money / Benefits advice – dedicated money advice advisor for employability participants.  They
offer benefit checks, general benefit advice, assistance to make claims, assistance to challenge
decisions, appeal representation along with general budgeting and money advice. 
Flexible procurement – through the LEP operational subgroup, provision gaps and needs will be
identified and a range of activity will be procured.  An example of this includes the Remote Health
and Wellbeing Programme supporting participants who have mental health/low confidence. 
VASLAN Supported Volunteering Programme – through VASLAN third sector organisations will
be identified to provide supported volunteering placements for participants 
Flexible training budget – Participants can access up to £3000 training where it can be clearly
demonstrated that it will lead to employment. 
Health and Wellbeing – South Lanarkshire Leisure will provide a range of activities to support
participants wellbeing in response to need. 
Monitoring of NOLB activity will be monitored through the LEP Operational Subgroup and the
wider LEP meetings.   We currently use Advice Pro which is a management information system
that allows us to run reports and track participants on their employability journey. 
To reach and support parents using
Parental Employability Support Funding –
including further information on specific
Parental groups identified as a local
priority
Parental support in South Lanarkshire  includes programmes funded by NOLB/TCP and has
been agreed to target the key priority groups below.
• Lone parents
• Parents with children who have a disability
• Parents with 3 more or children
• Parents from a minority ethnic background
• Parents with youngest child under 1
• Families with a parent under 25
• Other low-income parents 
68

Page 69

All participants engaging on LEP funded support have an identified keyworker responsible for
supporting them through an individual flexible action plan. Activity included in the plan may
include activity funded via the LEP or through other locally available provision and can
include:
• One-to one support
• Confidence building
• Work placements 
• Vocational tasters 
• Volunteering 
• Employability groupwork 
Keyworker supported participants can engage in a range of LEP funded provision. The
following are planned to be available across 20245/26 with further activity identified via the
LEP’s operational subgroup and procured via the SLC DPS / Framework. 
Making it Work  (RTWS) individually tailored service includes allocated key worker, action
planning, access to health and wellbeing interventions, confidence building and personal
development groupwork, access to training and volunteering opportunities, money and
budgeting advice, employability support.  RTWS are also offering groupwork through their
“Cook and Learn Café” where participants can learn cooking skills, customer service and
barista training.   “The Pantry” is also being launched where eligible participants can access
reduced price food items to allow them to go home and cook for their families.   
Supporting Families   This programme was previously delivered in partnership with Clyde
Gateway – as of 1st April 2025 it will be delivered solely by SLC.    This programme has now
expanded to include communities in Cambuslang, Rutherglen and Larkhall and Clydesdale.  
The SF model is a partnership approach working with local families and organisations to
provide a whole package of support for the family. Taking a place-based approach; engaging
families and integrating partnerships through the role of family support workers (FSW) linked
to Primary and early years centres identified due to high levels of parental poverty and
unemployment.  Referrals are made via identified Primary Schools to ensure a targeted
approach to support those families most in need.  Each participant has a dedicated key worker
who will complete a holistic needs assessment to establish realistic goals for the family with
69

Page 70

clear short, medium and long term family outcomes. Many participants who are with
Supporting Families then move onto the Making it Work Programme when ready to take part
in more formal employability / training activity. 
Supporting Families will also support a number of parents who are in work.  They will have
flexible key work support to help them achieve outcomes that may include moving to a better
paid job or achieving more hours / higher pay with their current employer. Support will
include access to up to training and qualifications where appropriate. 
Demonstrator (South Lanarkshire Council/ NHS ISS/ State Hospital) - Following on from the
success of previous years,  the Demonstrator programme which provides flexible part-time
paid training placements  will continue.   Participants are given wraparound support that
includes a key worker, access to certificated vocational training and a 26-week paid work
placement.     Placements are flexible to meet the needs of the individual in relation to hours
and working patterns.      Key worker support is given throughout the full duration of the
programme to track progress and help apply for post placement opportunities.   Outcomes
from the programme include gaining employment within NHS roles such as domestic,
portering, catering, healthcare support and admin/clerical.   
Money / Benefits advice – dedicated money advice advisor for employability participants. 
Support includes benefit checks, general benefit advice, assistance to make claims, assistance
to challenge decisions, appeal representation along with general budgeting and money
advice. 
South Lanarkshire College Employability Academy – a range of vocational/accredited training
courses participants can undertake; all delivery is agreed via the LEP Operational Subgroup. 
VASLAN Supported Volunteering Programme – through VASLAN third sector organisations will
be identified to provide supported volunteering placements for participants. 
Health and Wellbeing – South Lanarkshire Leisure will provide a range of activities to support
participants wellbeing in response to need. 
70

Page 71

Flexible procurement – through the LEP operational subgroup, provision gaps and needs will
be identified and a range of activity will be procured.   
Flexible training budget – Parents engaging on TCP programmes  can access up to £3000
training where it can be clearly demonstrated that it will lead to employment. 
Monitoring of NOLB activity will be monitored through the LEP Operational Subgroup and the
wider LEP meetings.   We currently use Advice Pro which is a management information system
that allows us to run reports and track participants on their employability journey. 
To provide Specialist Employability
Support using Employability SES funding
for disabled people and people with long
term health conditions. 
Where applicable, please detail models
being utilised and whether you are aiming
for full fidelity or otherwise. 
Where you are not using specialist
models, what makes this provision
“specialist” over and above mainstream
No One Left Behind support?
Supported Employment Service  (SLC)- For young people and adults with additional support
needs we offer a key work service through the Supported Employment Team.  All support given
follows the 5 stage of supported employment.    Participants, with their key worker will develop an
action plan and work towards their goals.   There will be groupwork activities developed to meet
the needs of the participants, for example Peer Groups, budgeting, confidence building,
promoting wellbeing.     Close working with the Employer Engagement team will ensure suitable
work placements are identified, for longer periods and to facilitate the key worker being present
initially.    The participants can also be involved with any of the wider provision on offer.    When
participants move into employment in-work support will be provided in the workplace along with
a longer period of aftercare. 
Project Search (SLC/NHS) Project Search will provide progression opportunities for supported
employment participants through a one-year work placement delivered in partnership with NHS
Lanarkshire. The programme includes a placement rotation within a hospital setting along with an
element of further education units delivered by New College Lanarkshire.    Each participant will
have a dedicated key worker who provides on site support whilst in placement.     
Gateway to Employment (Intensive) –  Routes to Work South will provide a dedicated resource
to provide specialist employability support to participants with significant and on-going health
related barriers to employment. The participants will typically require a longer-term approach
with a particular focus on significant aftercare and in-work support to sustain employment.
Participants may include people with health conditions, severe mental ill health and addictions.  
Each participant will have a key worker who will develop with them an action plan.   They will be
offered a bespoke 1-1 service that will include personal development, health and wellbeing
interventions, employability skills and groupwork. 
71

Page 72

The Gateway to Employment (Intensive) does not follow a full fidelity model or other specialist
model – however it meets the definition of Specialist Employability support as agreed by the
SLAED / Scottish Government SES Short Life Working Group:
Specialist Employment Support is targeted at people with significant and on-going
barriers to employment whose needs are not able to be met by mainstream employability
support and who require a longer-term approach with a particular focus on significant
aftercare and in-work support to sustain employment 
To reach and support disabled people
who do not require specialist support
Specific provision solely/mainly for this characteristic group over and above the support available
in NOLB and PES above. 
Participants across the LEPs keyworker programmes experience a range of barriers to
employment and a large proportion report a disability while not requiring specialist support. In
2024/25 over 40% of all NOLB / TCP registrations reported a disability. 
For those who do not require Specialist Support participants can access any of our programmes
on offer as mentioned above. 
To reach and support minority ethnic
people
Referral links between our service and the Resettlement Team have been reviewed and
new procedures have been put into place to ensure appropriate support is given.   
Over and above those that may be supported within the PES or NOLB sections above
South Lanarkshire’s employability programmes are designed to be flexible, keyworker
based with all participants supported to complete an action plan which takes into
account their individual circumstances and barriers including those in minority ethnic
groups. 
To reach and support economically
inactive people
Over and above those that may be supported within the PES or NOLB or Disability sections above 
To reach those who are economically inactive participants can access Routes to Work
South’s Gateway to Employment programme which is funded by Shared Prosperity Funds
and supports over 650 participants per year.   There are significant numbers of those EI
being supported with a mix of referrals from both self and via partners.   RTWS also
72

Page 73

deliver the WIN “What I Need” programme (funded by RTWS directly).   The WIN
programme offers a wide range of early stage, holistic support that will build resilience,
increase confidence and motivation, with a focus on participation, positive lifestyles, and
access to progression pathways and further development opportunities.   
For young people aged 16-19 who are not in a positive detention the Council’s
employability service is proactive in identifying young people who are economically
inactive through our regular participation measure exercises.  To date over 1,500 home
visits have been carried out to establish destinations and refer to keyworker provision. 
As we look to evaluate the impact of
NOLB/PES/SES and to help ensure
diversity of participation and
representation of views in a meaningful
way, what are your plans to ensure that
lived experience is reflected in the co-
design, evaluation and continuous
improvement of your service delivery? 
We have developed a set of service standards for all participants receiving keyworker-
based support from all SLC delivered or funded employability services. These services
standards include Visions and Values and a commitment to participants and were
developed along with a set of Minimum Delivery Standards through consultation and
engagement with participants. 
Our Vision:
The Employability Service will ensure participants achieve sustained positive
destinations by providing tailored, person-centred support and learning opportunities 
Our values:
- We listen and respond to the voices of participants
- We support participants to achieve their ambitions
- We are positive about participants and value their aspirations
- We are inclusive and respond to participant’s individual needs 
Our commitment to participants
- We will ensure you have a named employability keyworker 
- We will support you to develop an individual plan
- We will support you to achieve a positive destination that is right for you
- We will keep your personal data secure in line with GDPR
- We will regularly ask you for feedback on the service you are receiving 
- We will provide you with aftercare for as long as you require 
73

Page 74

All participants have an individual plan which is reviewed regularly, and all participants
are asked to feedback on their experience at the end of their engagement 
All groupwork programmes – either delivered by SLC or externally – are shaped by the
participants needs. As an example the RISE and Reach groupwork programmes which
support young people aged 16-19 through confidence building, employability skills,
personal development are flexible and the content and aims and objectives of each
programme are agreed in consultation and partnership with the young people taking part.
This approach is replicated across programmes and is particularly successful in the
Supporting Families (Tackling Child Poverty) and Supported Employment programmes. In
Supporting Families there is a strong focus on health and wellbeing activity and activities
are delivered (for example family cycling, walking groups, coffee and catch up sessions)
in response to participant’s priorities. 
Please describe what external provision
you intend to commission in this financial
year? 
Is this planned new commissioning or are
existing providers commissioned over
multiple years?
The LEP has agreed the following core external provision for 2025/26 
Routes to Work South:
• Gateway to Employment
• Gateway to Employment (Intensive)
• Making it Work
• Rise, Reach and Impact Groupwork programmes 
RTWS provision is delivered through the Teckal procurement exemption and is managed
through an annual contract between the council and RTWS 
VASLan
• Supported Volunteering Programme
The Supported Volunteering programme contract has been developed following previous
volunteering for employability delivery and will provide individualised volunteering
opportunities with local third sector organisations who will receive a daily payment for
providing support. 
74

Page 75

South Lanarkshire College 
- The Employability Academy delivers accredited and non-accredited sector based
and other training opportunities to employability participants. Delivery plans are
agreed on a quarterly basis through the LEP’s operational sub-group 
NHS Lanarkshire / ISS and The State Hospital 
- The Demonstrator programme funds part-time, flexible paid work placements to
eligible parents with work placements taking place at NHS Hairmyres and ISS
facilities services at Hairmyres and NHS and the State Hospital at Carstairs 
Needs led procurement:
A range of externally delivered activity will be procured through the year in response to
needs identified across keyworker programme caseloads and / or in response to
employer / labour market needs. It is likely that this will include sector based training and
pre-employment training, health and well-being and employability skills / personal
development. All provision will be agreed at the LEP operational sub-group and tendered
by SLC through the employability dynamic purchasing system or through negotiated
procedures. Examples in 2024/25 included winter and summer leaver programmes
delivered by for school leavers delivered by South Lanarkshire College, construction
tasters delivered by Tigers and First Steps Future Training, Remote health and wellbeing
delivered by TIGERS, QTS Rail skills academy, supported volunteering placements
through Clydesdale Community Initiatives, a Hospitality programme delivered through
MacDonald Hotels. 
RTWS also deliver a range of internally delivered and sub-contracted activity through the
SPF funded Gateway to Employment programme. This activity is also planned through
the LEP operational sub-group and access to this learning provision may be made
available to wider keywork participants with agreement. 
Additional opportunities are planned to be delivered across the year subject to funding
and will be agreed through the LEP operational subgroup and procured through the SLC
employability DPS framework. 
75

Page 76

No activity is commissioned beyond 1 year.
What engagement/marketing will be
undertaken with participants and
stakeholders such as DWP; Social
Security Scotland; Registered Social
Landlords; Childcare; Skills Development
Scotland; Carers; NHS/Health services;
Social Work; Other Local
Community/Third Sector Organisations to
further improve or support referral
pathways, particularly in respect of
under-represented groups in your area?
Regular LEP Meeting are held on a quarterly basis with range of strategic partners
including DWP, SDS, NHS Lanarkshire, SLC Housing, SLC Education, SLC YFCL, SLC
VASLAN (TSI), South Lanarkshire College, DYW Lanarkshire   
LEP  sub-groups:
• Operational subgroup 
• Tackling Child Poverty 
• Health / SES 
We recently held a Partnership Event with all LEP partners and keyworkers and plan to do
this again in 2025/26. 
Referral Pathways - Through the LEP operational subgroup discussions continue to take
place to ensure all teams/programmes/partners  are aware of the  referral pathways
available, how to refer and who the point of contact is.   Close monitoring of all
programmes also takes place at a local level between SLC, RTWS and DWP to ensure
referrals are coming through and appropriate.   
We also work closely with Skills Development Scotland and have recently drawn up
NOLB/Aspireworks guidance for referrals for AspireWorks programme for 16–19-year-
olds. 
There is ongoing engagement with partners and SLC services to ensure referral pathways
are established and continually reinforced for example to new starts etc. For example,
During 2024/25 presentations were delivered to all SLC Housing officers and assistants. 
We have recently reviewed our referral process for the Resettlement Team to ensure all
participants are offered appropriate support. 
The Employability Service is engaged in a range of partnership groups locally and :
• CLD Partnership and locality groups
• Keeping the Promise 
• Homelessness Strategy Group
76

Page 77

• DYW
• Care Experienced Tracking
• Community Wealth Building 
• The Beacons Steering Group (addictions)
• VASLAN – Third Sector Network meetings 
Please describe planned engagement
with employers including Anchor
Institutions and Local Businesses and
any work towards supporting the Green
Economy
An SLC employer engagement team has been established and works across all SLC in-
house employability programmes to identify work placements and employment
progression opportunities. The team works closely with RTWS to share information and
jointly respond to meet the needs of employers. 
The team will work closely with the Council’s business support team to provide support
to employers with a recruitment need and identify how employability participants can be
upskilled to fill vacancies.   
The team will continue to attend local network events and will work with RTWS, local
employers and SLC personnel services to hold jobs fairs in response to local demand. 
Work placements play a key role in the plans of many participants, particularly young
people engaging on the Aspire, AspireWorks programmes and our supported
employment participants. The sourcing of placements is a key role of the employer
engagement team and we have established work placements guidance which sets out
the process for planning and review of placements. 
Employability-focused employer engagement is responsive and driven by employer
demand and the team and RTWS have significant experience of responding to the needs
of employers to co-ordinate support to move participants into vacancies. The majority of
employment progressions are into entry-level posts and to date there have been few
opportunities within the green economy. The Council has a Sustainable Development
and Climate Change Strategy which includes actions to support employers developing
opportunities within the green economy and we are in a strong position to respond to
needs from an employability point of view.
77

Page 78

Please describe the plans for provision of
Employer Recruitment Incentives/paid
work placements
We will provide paid-work placements to parents engaging on the NHS and SLC
demonstrator programmes. 
An ERI programme will be available to employers – restricted to circumstances where it
can be demonstrated that the creation of the ERI will support an existing registered
employability participant who would not otherwise have progressed to employment with
that employer. However, it is anticipated that Scottish Government Fair Work First
Guidance will restrict employer eligibility and take-up similar to the experience during
2024/25.   
Please describe the plans for the
provision of training allowances
The service has a well-established process for paying expenses and training allowances
to participants engaging in activity including groupwork, training and work placements. 
• Young people are encouraged to use the NEC free bus travel however where this is
not feasible travel expenses will be paid.
• Participants accessing training / groupwork where lunch and travel is not provided
receive £10 per day (where this will not affect benefits)
• Participants taking part in work placements are provided with £25 per day training
allowance (max 3 days per week) (where this will not affect benefits) 
All expenses and training allowances are paid through the Council’s Bankline system.
Please describe any challenges, issues or
concerns that may affect delivery this
financial year. 
What steps are you taking to address
these?
The main challenges relate to single year funding :
• inability to commence competitive procurement processes prior to receipt of
grant and all contracts being dated only to the 31st March 2026. This reduces
spend and restricts delivery
• unable to fill staff vacancies until confirmation of funding 
These challenges have been mitigated by increased use of RTWS teckal arrangement and
use of negotiated procedures to award contracts directly. 
78

Page 79

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund -
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to grant applications from the Renewable Energy Fund
for:-
[purpose]
 Douglas Water Golf Club
 Duneaton Community Trust
 East Renfrewshire Council
 Glespin Community Group SCIO (Scottish Charitable Incorporated Organisation)
 Kirkmuirhill and Blackwood Men’s Shed
 Strathaven Rugby and Football Club Limited
 [1purp]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a grant be awarded to Douglas Water Golf Club of up to £45,865 from the
Renewable Energy Fund to purchase course maintenance equipment and
storage;
(2) that a grant be awarded to Duneaton Community Trust of up to £31,050.12 from
the Renewable Energy Fund to employ a community development worker;
(3) that a grant be awarded to East Renfrewshire Council of up to £72,635 from the
Renewable Energy Fund to continue Whitelee Countryside Ranger Service;
(4) that a grant be awarded to Glespin Community Group SCIO of up to £26,060
from the Renewable Energy Fund to instal solar panels and a new heating
system;
(5) that a grant be awarded to the Kirkmuirhill and Blackwood Men’s Shed of up to
£96,500 from the Renewable Energy Fund to complete a property purchase; and
(6) that a grant be awarded to the Strathaven Rugby and Football Club Limited of up
to £670,769 from the Renewable Energy Fund to construct an indoor training
facility. 
3. Background
3.1. Since 2004, the Council has collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing the contributions from windfarm developers, advising
potential applicants, assessing applications and monitoring projects to ensure that the
community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities. 
8
79

Page 80

3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority. All grants awarded are reported annually to the Community and
Enterprise Resources Committee.   
3.3. Several changes were made to the REF criteria at the Community and Enterprise
Resources Committee of 6 February 2024 including supporting revenue funding,
increases to intervention levels and aiming to deliver larger more strategically
impactful projects. 
4. Grant Recommendation
4.1. Application Number 12224 
Douglas Water Golf Club – project value £65,521 
Proposed Grant award £45,865.23 intervention rate of 70% 
The proposed grant will be funded from Gallawhistle Windfarm which contributes into
the Renewable Energy Fund 
4.2. Douglas Water Golf club (DWGC) is a community group with its purpose being:- 
To provide and manage facilities for the enjoyment of the game of golf under the
auspices of the appropriate Golf Unions and other regulatory bodies.  The Club shall
endeavour to promote the health and wellbeing of the residents of the Douglas Valley
and South Lanarkshire area, without distinction of race, religion, or political or other
opinions, through the participation of sport.
To provide Golf at an affordable level with particular concessions and support for the
elderly, unemployed and young by means of free coaching and free use of facilities for
competitions for local schools and junior organisations.
To encourage and teach participants to play with discipline and sportsmanship and in
competition, according to the official rules of Golf.
The Club shall continually improve the facilities in order to provide additional
recreational and social platform for use by the local community’. 
4.3. DWGC has a 14-member management committee with one part-time staff member
and 70 members.  DWGC is an integral part of the Rigside and Douglas Water
community.  DWGC continuation and improvements have been identified within the
community action plan.   
4.4. The grant will allow DWGC to purchase a greens mower, tees mower and a container
to house the new machinery as well as providing workshop space. 
4.5. The project requires capital funding to purchase essential course maintenance
machinery to ensure the course is maintained to high standard for members, local
community and visitors to the area. Container purchase will house new machinery and
provide workshop space to clean and maintain all and machinery and equipment. 
4.6. The project has been established as part of the local action plan produced by the local
community, the course features strongly in the community action plan. 
4.7. The application has been assessed and scored an average of 29 out of 53 supporting
a grant award of up to £45,865.23 totalling 70% of eligible costs. 
80

Page 81

4.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:-  
Funder Stage Value
Clyde Wind Farm To be confirmed £19,656.53
SLC Renewable Energy Fund Grant
(60%) Gallawhistle. 
For approval £45,865.23
Total project value   £65,521.76  
4.9. The project is scheduled to commence in May 2025 and be complete by June 2025.
Officers will work with the applicant to monitor progress and any impact on the
timescales and allow officers to confirm Clyde Wind Farm Fund has been secured. 
5. Grant Recommendation
5.1. Application Number 1306 
Duneaton Community Trust – project value £41,400   
Proposed Grant award £31,050 intervention rate of 75% 
The proposed grant will be funded from Middle Muir Windfarm which contributed to
the REF.  
5.2. Duneaton Community Trust (DCT) is a community trust with its purpose being:- 
To advance rural regeneration and community development within the Duneaton
Community Council area of South Lanarkshire so it can be a sustainable, inclusive
community for all who live, work in or visit. The Duneaton area comprises the villages
of Abington, Coulter, Crawfordjohn, Lamington, Roberton, Wandel and Wiston and
their surroundings. 
5.3. DCT management committee has seven members, 10 regular volunteers and 17
members. 
5.4. The grant will allow DCT to continue to employ the part-time Community Development
Worker for a two-year period from 1 June 2025.  The continued work of the community
development officer is an essential part of the growth and success of DCT to support
community benefit focused project delivery within Duneaton. 
5.5. The project has been established with an initial public consultation process; this will
feed into the community action plan. 
5.6. The application has been assessed and scored an average of 30.5 out of 53
supporting a grant award of up to £31,050 totalling 75% of eligible costs. 
5.7. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:  
Funder Stage Value
Clyde Extension Community Fund To be confirmed £10,350.04
SLC Renewable Energy Fund Grant
(75%) Middle Muir
For approval £31,050.12
Total project value   £41,400,16 
5.8. The post is scheduled to commence in June 2025 and run until May 2027. Officers will
work with the applicant to monitor progress and any impact on the timescales and
allow officers to confirm Clyde Extension Community Fund has been secured. 
81

Page 82

6. Grant Recommendation
6.1. Application Number 1315 
East Renfrewshire Council – project value £201,765   
Proposed Grant award £72,635 intervention rate of 36% 
The proposed grant will be funded from Whitelee which contributes to the REF. 
6.2. East Renfrewshire Council (ERC) (Access Project) is a local authority with its
purpose being: - 
To play a vital role in providing essential services and promoting the well-being of local
communities, ranging from managing infrastructure to supporting vulnerable
populations. 
6.3. The Access Project for Whitlee Windfarm is managed by ERC and is a shared service
providing a range of community and visitor-focussed functions, in addition to meeting
the maintenance obligations of South Lanarkshire and East Renfrewshire Councils, in
line with landowner agreements. Key outcomes include the delivery of recreational
activity and events, volunteering, biodiversity work, outreach and the delivery of
environmental education to local schools and community groups.  East Renfrewshire
Council’s contribution (£129,130) to the project costs has been approved.   
6.4. The project will be managed by the Whitelee Access Officer, who reports on a regular
basis to the three authorities within whose boundaries the windfarm is located.   
6.5. The Enterprise Resources Committee of 27 June 2007 approved a Section75
agreement which placed an obligation on the Council to jointly prepare and implement
an access strategy for Whitelee Windfarm. The maintenance of these access works
can utilise up to 40% of the community benefit monies received each year.   
6.6. The application has been assessed and scored an average of 36.5 out of 53
supporting a grant award of up to £72,635 totalling 36% of eligible costs. 
6.7. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below: 
Funder Stage Value
East Renfrewshire Council Confirmed £129,130
SLC Renewable Energy Fund Grant
(36%) Whitlee
For approval £72,635
Total project value   £201,765  
6.8. The project is scheduled to commence in May 2025 and be complete by April 2027.
Officers will work with the applicant to monitor progress and any impact on the
timescales. 
7. Grant Recommendation
7.1 Application Number 1284 
Glespin Community Group SCIO – project value £46,060 
Proposed grant award £26,060 intervention rate of 57% 
The proposed REF grant will be funded from Andershaw windfarm which contributes
into the Renewable Energy Fund 
82

Page 83

7.2. Glespin Community Group SCIO (GCGS) is a Charity with its purpose being: - 
‘the advancement of education”, “the advancement of health”, “the advancement of
citizenship or community development”, “the provision of recreational facilities, or the
organisation of recreational activities, with the object of improving the conditions of life
for the persons for whom the facilities or activities are primarily intended”, “the
advancement of environmental protection or improvement. 
7.3. GCGS has a 3-member management committee, 6 regular volunteers and 9
members. 
7.4. The project requires capital funding to instal solar panels on Glespin Community Hall
roof, remove old oil boiler system and associated pipe works and instal an air source
heat pump and associated pipe works. The project has been tendered and best value
has been obtained the group. The group have confirmed no panning approval required
a building warrant is being progressed.   
7.5. The project links with the community action plan and delivers on the need to move to
green energy, reducing carbon emission, while making the hall more sustainable by
reducing running costs. 
7.6. The application has been assessed and scored an average of 36.5 out of 53
supporting a grant award of up to £26,060 totalling 57% of eligible costs. 
7.7. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:-  
Funder Stage Value
Galawhistle Wind Farm To be confirmed £20,000
SLC Renewable Energy Fund Grant
(100%) Andershaw 
For approval £26,060
Total project value   £46,060 
7.8. The project is scheduled to commence in May 2025 and be complete by June 2025.
Officers will work with the applicant to monitor project progress and allow officers to
confirm Gallawhistle Wind Farm Fund has been secured. 
8. Grant Recommendation
8.1. Application Number 1303 
Kirkmuirhill and Blackwood Men’s Shed – project value £96,500 
Proposed Grant award £96,500 intervention rate of 100% 
The proposed grant will be funded from Auchrobert and Nutberry Windfarms which
contribute into the Renewable Energy Fund 
8.2. Kirkmuirhill and Blackwood Men’s Shed (KBMS) is a community group with its purpose
being: - 
To provide access to equipment and materials (mainly recycled) that will encourage
members to create and/or repair items, develop new skills and share existing ones
with others. They achieve this by providing access to accommodation that is designed
and fitted out with suitable equipment to support these activities and by either
signposting or accessing support, tutorials and training for members. 
8.3. KBMS has a six-member management committee, 15 regular volunteers and 54
members.  
83

Page 84

8.4. The grant is for acquisition costs to allow KBMS to complete a property purchase of
Kirkmuirhill Inn, Thornton Road, Kirkmuirhill, including legal costs.     
8.5. KBMS have been supported by Council Officers on the transfer process.   
8.6. The project has been established from a community survey and the project will be
included within the Local Place Plan. 
8.7. The application has been assessed and scored an average of 35 out of 53 supporting
a grant award of up to £96,500 totalling 100% of eligible costs. Kirkmuirhill and
Blackwood are villages where through changes made at the February 2024
Community and Enterprise Resources Committee 100% grants can be approved
where good projects have difficulty securing match funding. 
8.8. Renewable Energy Fund award set out below: 
Funder Stage Value
SLC Renewable Energy Fund Grant
(100%) Auchrobert and Nutberry
For approval £96,500
Total project value   £96,500  
8.9. The project is scheduled to commence in August 2025 and be complete by October
2025. Officers will work with the applicant to monitor progress and any impact on the
timescales. 
9. Grant Recommendation
9.1. Application Number 1301 
Strathaven Rugby Football Club Limited – project value £1,533,242.94 
Proposed Grant award £670,769 intervention rate of 44% 
The proposed grant will be funded from West Brown Castle windfarm which
contributes into the Renewable Energy Fund 
9.2. Strathaven Rugby Football Club Limited (SRFCL) is a Charity with its purpose being:
-
To provide sporting facilities for a large rural area.  They specialise in offering rugby
training, they have teams for all ages and genders and are linked to the Scottish Rugby
Union.  All coaches and committee have full Police Checks/ disclosure Scotland and
PVGs in place to ensure a safe environment for all. They aim to reduce social isolation
among all age groups, with the facilities having open access to be used by the local
community for other types of sport i.e. football, hockey, cricket, yoga and jogging. 
9.3. SRFCL has a 5-member management committee, 20 regular volunteers and 938
members. 
9.4. The project requires capital funding to construct a 60mx30m facility to include 133
solar panels, battery storage system, 2x3G surfaced pitches, 1 hard standing sports
surface area, improved road access to the facility from the A723, redesign and
increase parking capacity. 
9.5. Planning permission is in place, the group have completed a tender process and have
a preferred contractor in line with best value. 
84

Page 85

9.6. The facility will be disability friendly allowing SRFCL to provide wheelchair rugby and
develop the current walking rugby club which attracts mobility challenged members. It
will be gender neutral and inclusive for all allowing SRFCL to engage with the
community at all levels encouraging all to become fitter and less socially isolated whilst
assisting SRFCL to continue to grow youth, girls and senior women’s sections of the
club. The facility out with the club’s requirement, will have community access at
dedicated times and in addition will facilitate other organisations in the community such
as Strathaven Dynamo AFC, Strathaven Striders and the Scouts and Guides. 
9.7. This project has been established from SRFCL membership consultation with
community support from a wide range of organisations. SRFCL development and
contribution is a priority within the Community Action Plan. 
9.8. The application has been assessed and scored an average of 37 out of 53 supporting
a grant award of up to £670,769 totalling 44% of eligible costs. 
9.9. All Renewable Energy Fund awards are subject to suitable match funding being
secured. The REF grant sought is 44% of the project value with the match funding as
set out below.   
9.10. The Community and Enterprise Committee of 14 March 2023 approved the use of
£387,473 developers contribution to SRFCL and this project. 
Funder Stage Value
South Lanarkshire Councils Developer
Contributions - Strathaven Community
Sports and Sports Facilities Fund
Confirmed   £387,473
Scottish Football Association - Level Up
Fund
To be confirmed £400,000
Onpath Kypemuir Windfarm Fund To be confirmed £75,000
SLC Renewable Energy Fund Grant
(61%) West Brown Castle
For approval £670,769.94
Total project value   £1,533,242.94  
9.11. The project is scheduled to commence in August 2025 and be complete by October
2026. Officers will work with the applicant to monitor progress and any impact on the
timescales and allow officers to confirm match funding has been secured. 
10. Employee Implications
10.1. There are no employee implications arising from this report. 
11. Financial Implications
11.1. The awards will come from Gallawhistle, Middle Muir, Whitelee, Andershaw,
Auchrobert, Nuttberry and West Brown Castle Windfarms which contributes to the
Renewable Energy Fund. The Funds have sufficient resources to meet the proposed
grant awards commitment detailed in this report. 
11.2. REF funding awards are subject to all other funding being secured.   
12. Climate Change, Sustainability and Environmental Implications
12.1. GCGS Air Source Heat Pump, Solar Panels will help reduce demand for non-
renewable resources. 
12.2. SRFCL Solar Panels will help reduce demand for non-renewable resources. 
85

Page 86

13. Other Implications
13.1. The risks associated with the project are focused on the potential for cost overruns,
delays to the projects or match funding not being secured. Work will continue with the
applicant to help ensure match funding is secured and that projects are delivered
broadly on time and within budget. 
14. Integrated Impact Assessment and Consultation Requirements
14.1 This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
14.2 Community Consultation is a requirement for all REF grants, consultation can be
referenced through community action plans, independent consultation and social
media platforms. 
David Booth 
Executive Director (Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware, and improving
 Fair, open and sustainable
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress, and improve
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resources Committee 6 February 2024 Renewable Energy
Fund - Strengthening Links to Rural Priorities. 
 Community and enterprise Resources Committee 14 March 2023 – Zero Carbon indoor
Multi Sports Facility Proposal Strathaven Rugby Club 
86

Page 87

List of Background Papers
 Completed REF Appraisal Scoring Sheet for application number 1224
 Completed REF Grant Application Form for application number 1224
 Completed REF Appraisal Scoring Sheet for application number 1306
 Completed REF Grant Application Form for application number 1306
 Completed REF Appraisal Scoring Sheet for application number 1315
 Completed REF Grant Application Form for application number 1315
 Completed REF Appraisal Scoring Sheet for application number 1284
 Completed REF Grant Application Form for application number 1284
 Completed REF Appraisal Scoring Sheet for application number 1303
 Completed REF Grant Application Form for application number 1303
 Completed REF Appraisal Scoring Sheet for application number 1301
 Completed REF Grant Application Form for application number 1301 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Colin McFarlane
Project Development Officer
Enterprise and Sustainable Development Services
E-mail: -  colin.mcfarlane@southlanarkshire.gov.uk 
87

Page 88

88

Page 89

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Renewable Energy Fund – New Windfarm
Contributions 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 seek approval for community benefit payments generated from Kype Muir
Extension and Cumberhead to be managed through the Renewable Energy Fund
(REF)
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Council’s Renewable Energy Fund (REF) incorporate provision for the
receipt and disbursement of community benefit payments in respect of Kype Muir
Extension and Cumberhead windfarm sites. 
3. Background
3.1. Through its Renewable Energy Community Benefits Policy, the Council has sought
annual community benefit payments of £5,000 per megawatt (MW) index linked from
the first payment from windfarm developments. This is aligned with the Scottish
Government’s Good Practice Principles for Onshore Energy Development
recommendations published in 2015 that identifies the opportunity for communities to
share in the benefits from their local energy resource. These contribution rates are for
guidance only as neither the Scottish Government nor the Council can oblige
developers to provide community benefit contributions or that the Council administers
the Community Benefit funds. 
3.2. These agreements with developers place an obligation on the Council to administer
community benefit funding received through the established REF processes. The REF
currently manages community benefits from some 42 windfarms. 
3.3. A number of changes were approved at the 6 February 2024 Community and
Enterprise Committee to help the fund deliver more strategically these changes
included setting seven priorities as listed below:-  
1.) Transport and connectivity
2.) Recreation and community facilities
3.) Rural entrepreneurial activities and business infrastructure
4.) Jobs, training and employability  
9
89

Page 90

5.) Environmental and net zero sustainability
6.) Rural poverty and wellbeing
7.) Tourist and visitor infrastructure to support tourism and business 
3.4. Changes to the intervention levels and criteria were also approved and are listed
below:- 
 an ability to fund revenue projects for up to 3 years in addition to capital projects
 increase the small grants level to 100% funding up to £20k
 increase the large grant maximum to 75% and in specific areas and with
conditions up to 100% grants would be available
 introduce a Rural Facilities Sustainability Fund to help communities consider
asset ownership and retain facilities for a period of up to 3 years
 in consultation with communities, Community and Enterprise Resources will
develop larger more complex community projects on behalf of local communities
and local needs focusing around the strategic challenges 
4. Eligible Areas for Distribution of REF Grants from Windfarm Sites
4.1. The eligible area for the funds generated from each of the developments is identified
in Maps 1 and 2 for Cumberhead and Kype Muir extension and are generally within
10km of the application site boundary. Each map identifies the geographical area
covered by each of the windfarm community benefit funds. 
4.2. Cumberhead Windfarm is located at Stockhill, New Trows Road near Coalburn and
was developed by Cumberhead Wind Energy Ltd which was consented in May 2021. 
The windfarm is now owned and operated by Octopus Energy. The windfarm consists
of 12 turbines with a maximum power generation of 48MW per annum. 
4.3.  The legal agreement provides a total of £5,000 per MW per annum of Community
Benefit Funds totalling £240,000 per annum which is divided with £120,000
administered by Foundation Scotland and £120,000 by the Council via the REF. The
annual contribution starting in 2024 and is index linked.   
4.4. Kype Muir Windfarm extension is 7.5km south of Strathaven and was developed by
Banks Renewable Energy Ltd which was consented in January 2019.  The windfarm
is now owned by Schroder Greencoat LLP. The windfarm consists of 15 turbines with
a maximum tip height of 200m and generates 67.2MW per annum. 
4.5. The legal agreement provides £5,000 per MW of Community Benefit funds totalling
£336,000 per annum which is divided with £168,000 administered by Point North for
and the Kype Muir Community Partnership and £168,000 by the Council via the REF.
The annual contribution starting in 2024 and is index linked.   
4.6. The total being brought inside the administration of the Council’s REF is £288,000 per
annum, with £120,000 from Cumberhead and £168,000 from Kype Muir Extension.      
5. Employee Implications
5.1. These additional REF contributions will be managed using existing Enterprise and
Sustainability Development Services staff. 
6. Financial Implications
6.1. There are no additional financial implications for the Council in managing the proposed
new funds. Funding can only be dispersed to projects located within the eligible areas
once funds have been received from the developer and the developers have made
initial year one payments. 
90

Page 91

7. Climate Change, Sustainability and Environmental Implications
7.1. The environment and net zero sustainability is one of the seven priorities for the
Community Benefit Fund agreed at the Community and Enterprise Committee of 6
February 2024. The fund will, therefore, be able to support climate action and
sustainability projects with communities.   
8. Other Implications
8.1. The funds will assist in delivering the Community Wealth Building aims, in areas such
as retaining wealth locally, community ownership. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. Each of these developments have undertaken consultation following the Scottish
Government’s Good Practice Principles for Onshore Energy Development
recommendations involving local communities and Community Councils. 
David Booth
Executive Director ( Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Executive Committee 3 March 2004, “Community Benefit: Establishment of a
Renewable Energy Fund” 
 Executive Committee 1 December 2010, Renewable Energy Developments and
Community Benefit. 
 Enterprise Services Committee 1 April 2014, Scottish Government Consultation on
Good Practice Principles for Community Benefits from Onshore Renewable Energy
Developments 
91

Page 92

List of Background Papers
 Planning consents Kypemuir extension, Cumberhead windfarms 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Kenny Lean
Manager 
Ext:    (Tel: 07469027925 )
E-mail:  kenny.lean@southlanarkshire.gov.uk 
92

Page 93

93

Page 94

94

Page 95

Report   
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: UK Shared Prosperity Fund 2025/2026 
1. Purpose of Report
1.1. The purpose of the brief is to:- 
 update the Committee on the proposed programme for the UK Shared Prosperity
Fund (UKSPF) in 2025/2026 
2. Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s): - 
(1) that the changes made by the UK Government to UKSPF be noted; and
(2) that the expenditure profile, as set out in paragraph 4.7 for 2025/2026 be
approved. 
3. Background
3.1. In 2022, South Lanarkshire Council received an allocation of £12,221,811 from the UK
Government providing a mix of capital and revenue funding for projects which meet
the UKSPF’s four investment themes, communities and place, support for local
business, people and skills and multiply. The initial UKSPF ran for three financial years
from 2022/2023 to 2024/2025. 
3.2. On 9 August 2022, Community and Enterprise Resources Committee considered a
report outlining the approach for South Lanarkshire and agreed to work as part of the
Glasgow City Region (GCR) with a single Investment Plan for the Region. 
3.3. On 29 August 2023, Committee approved the expenditure profile and authorised
delegated authority to the Executive Director (Community and Enterprise Resources)
to vary spend priorities for South Lanarkshire. It was agreed annual progress reports
would be brought to Committee. 
3.4. The Glasgow City Region Investment Pan for a combined total value of £73,874,280
was submitted on 30 August 2022 and approval of the Investment Plan was received
from the UK Government on 5 December 2022.   
3.5. Table 1 sets out the financial split by Intervention Theme approved at Committee and
Table 2 sets out the financial profile over the 3 years including any carry forwards into
2024/25.  The UK Government did not permit any underspend from 2024/2025 to be
carried into 2025/2026.  The Council achieved full spend of UKSPF. 
10
95

Page 96

Table  1
INTERVENTION THEME  Totals 
Share of   
Total budget
Community and Place Intervention £3,711,456       30%
Local Business Intervention £3,021,284       25%
People and Skills Intervention £2,941,472       24%
Multiply Intervention £1,938,284       16%
GCR wide programmes £ 120,443         1%
4 % Management  £488,872             4%
TOTAL ANNUAL BUDGET  £ 12,221,811 
Table 2 
Financial
Profile 
Year 1 22/23  Year 2 23/24  Year 3 24/25  Total 
SLC Delivery
Profile 
£    305,532  £3,514,433  £7,792,531  £11,612,496
Management £      74,607 £   153,690 £   260,575    £     488,872
GCR wide
projects 
£     35,964 £     84,479 £     120,443 
£   380,139 £3,704,087 £8,137,585 £12,221,811 
3.6 An annual report on the 2024/2025 expenditure and Glasgow City Region position will
be brought to the next Community and Enterprise Committee following reporting the
final claim for 2024/2025 to the UK Government which is due in May 2025.     
4. UK Shared Prosperity Fund in 2025/2026  
4.1. The UK Government’s Autumn Budget Statement was presented to Parliament on 30
October 2024. The Chancellor confirmed that UKSPF will continue for a Year 4
2025/2026, however with a budget reduction to £900m for the 12 month-period. This
is a reduction of around 40% from the Year 3 allocation of £1.5Bn. 
4.2. While this level of funding was confirmed in the Autumn Statement, individual Regional
/ Local Authority allocations were not clarified until December 2024. Part of the reason
for the delay in the confirmation of the 2025/2026 budget was a change in the
allocation methodology by the UK Government. While the overall Scottish allocation
remained at 8.42% of the total UKSPF budget, not all Local Authority allocations were
reduced by an equivalent amount. 
4.3. Allocations have been adjusted to prioritise areas with the highest levels of deprivation. 
After applying the revised allocation methodology, four Managing Authorities (MAs) in
the Glasgow City Region have had their UKSPF budget reduced by approximately
45% and four MAs reduced by 20%. Across the 32 Local Authorities in Scotland, the
six most deprived (of which four are in the GCR) received the 20% reduction.  
96

Page 97

4.4. Table 3 provides details of the confirmed allocation by MA, the total for the GCR and
the variance from the Yr3 (2024/2025) allocation. 
Yr 3 Total
(inc. Multiply)
Actual
allocation 2025
/ 2026
Variance from
Yr 3 total
Member Authority     
E. Dunbartonshire £2,072,697 £1,159,173 (£913,524)
E. Renfrewshire £1,929,328 £1,078,992 (£850,336)
Glasgow City £15,951,695 £11,834,805 (4,116,890)
Inverclyde £2,089,711 £1,550,389 (£539,322)
N. Lanarkshire £8,133,224 £6,034,163 (£2,099,061)
Renfrewshire £3,688,691 £2,062,930 (£1,625,461)
S. Lanarkshire £7,166,203 £4,007,757 (£3,158,446)
W. Dunbartonshire £2,284,294 £1,694,752 (£589,542)
TOTAL £43,315,843 £29,422,961 (£13,892,882)
Table 3. 2025/2026 UKSPF Allocations
4.5. The South Lanarkshire 2025/2026 budget is 44% less than the 2024/2025 allocation
with a budget of £4m for 2025/2026. The UK Government has also changed the
number of interventions and removed the Multiply theme. 
4.6. The UK Government has set a minimum capital spend for councils.  Glasgow City
Region at the Cabinet meeting of 13 February 2025 agreed to aggregate the reporting
of the capital spend across all the City Regions which will give a minimum capital
spend requirement of 23.33% for all councils.  Councils can, if they choose, exceed
the minimum capital spend requirement. 
4.7. Officers have worked across the Council to prepare a proposal which delivers on the
Councils priorities and fits within the UKSPF budget.  Table 4 below sets out the
proposed allocation.   
Heading  Budget      
2025 - 26 CAPITAL REVENUE Description
High Street and
Town Centre
funding 
£ 1,030,000   £    350,000   £    680,000 
£700k to the East Kilbride
Masterplan contributing to the
approved £2m 2025/26
expenditure.   
£300k to feasibility costs/small
grants fund for all town centres 
Support  for net
zero
sustainability 
£    100,000     £    100,000  To deliver low carbon agenda
feasibility on Council buildings 
Support for 
leisure and
recreation 
£    150,000   £    150,000   
Alteration works within Larkhall
Academy to improve
community access to games
halls out with school hours as
part of revised dual use
agreement centre games hall
conversion
Visit Lanarkshire  £     40,000     £     40,000  Support for Visit Lanarkshire
promotions
97

Page 98

Support for
Community
Empowerment 
£    270,098     £    270,098 
Support for Community
empowerment including:
£30k for continued UKSPF
funding support for Community
Asset Transfer through funding
50% of FTE post costs.                                                                                                       
£50k new support for food
network as a start-up grant to
establish a local food
partnership. 
£120k Participatory budgeting
grants in addition to the
existing £40k Council budget
investing in neighbourhood
Plans and community led
activity
£70k new support for food and
inequalities via a policy officer
and IT costs.
COMMUNITY
TOTAL   £ 1,590,098       
Promote
Lanarkshire  £     75,000     £     75,000  Deliver tourism strategy
Investment in
business
infrastructure 
£    480,000   £    480,000   
Contribution to the
development of two business
units at Cathcart Road,
Rutherglen which will create
620sqm of industrial space and
support up to 13 jobs.  Total
project cost £2.1m with
additional funding being sought
from Glasgow City Region and
the Regeneration Capital Grant
Fund. 
BUSINESS
TOTAL  £    555,000       
South
Lanarkshire
Works 
£ 1,100,000     £ 1,100,000 
Alongside No One left Behind
funding programme to provide
employability support. UKSPF
will deliver an additional
support for 1,000 people and
progress more than 700 into
employment or further learning
School leavers
support  £    600,000     £    600,000 
Supporting the ASPIRE
programme the UKSPF
funding will support an
additional 500 young people
with school leaver destinations.
EMPLOYABILITY
TOTAL  £ 1,700,000       
£    980,000   £ 2,865,098  £ 3,845,098 
TOTAL  £ 3,845,098  24% 72%  
4 % Management 
Funding staff in
Programme
Management
and compliance                                                                      £ 160,212 
SPEND PROFILE
INCLUDING 4%
Management Fee      £ 4,005,310 
98

Page 99

4.8. The budget allocation proposal will support Economic Development priorities
including, employability, tourism, town centre redevelopment, business infrastructure
and the net zero agenda.     
5.  Employee Implications
5.1.  The proposal ensures a budget for staff currently funded by UKSPF and previously
through the European Social Fund in employability and the compliance and
management of the funds. 
6.  Financial Implications
6.1.  Funding requires to be fully incurred in 2025/2026 with no ability to carry forward into
future years.   
7. Climate Change, Sustainability and Environmental Implications
7.1. In support for net zero Investment priority there is activity that will support the reduction
of carbon emissions and sustainability. 
8.  Other Implications
8.1. Funding for the current programme ends in March 2026, uncertainty of funding post
March 2026 will impact on strategic planning and continuity of projects. If funding is
reduced or ceases altogether there will be significant impact on the delivery of projects
and funding for staffing. The impact on these will be assessed once a funding
positions becomes clearer after the Governments spending review in summer 2025.     
9.  Integrated Impact Assessment and Consultation Requirements
9.1.  This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
9. 2. Consultation for the 2025/2026 programme has been undertaken with Council
Resources. 
David Booth
Executive Director (Community and Enterprise Resources) 
29 April 2025 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships  
99

Page 100

Previous References
 Community and Enterprise Resources Committee 29 August 2023 – UK Shared
Prosperity Fund
 Community and Enterprise Resources Committee 26 November 2024 – UK Shared
Prosperity Fund 
List of Background Papers
 Community and Enterprise Resources Committee 9 August 2022 – UK Shared Prosperity
Fund 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kenny Lean, Programme Manager 
Planning and Economic Development Services
Tel:  07469 027925
E-mail: Kenny.Lean@southlanarkshire.gov.uk 
100

Page 101

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – 2024/2025 Annual Report 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide an update on the Community Benefit Funds administered by Enterprise
and Sustainable Development Services on behalf of the Council during
2024/2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the Community Benefit Funds administered by the Council and the grants
awarded under the Renewable Energy Fund, Clyde Wind Farm Fund and
Quarry Funds in 2024/2025 be noted. 
3. Background
3.1. The Council has a well-established mechanism for the collection and distribution of
community benefit related to wind farm developments. This was initially established
following the approval of a report by the Executive Committee entitled Community
Benefit (Establishment of a Renewable Energy Fund) on the 3 March 2004. 
3.2. The Council administers the community benefit element of the Renewable Energy
Fund (REF) for 42 wind farms within South Lanarkshire and the community benefit
for Clyde Wind Farm Fund (CWFF) and 5 operational quarries. Operators of larger
windfarm developments provide recurring annual fund contributions, formalised
through legal agreements, whilst smaller developments such as single wind turbines
sites, may consider providing a ‘capitalised’ one off community benefit payment.
Community groups, social enterprises, trusts, public organisations and not for profit
organisations within 10km of a contributing wind farm provider are eligible to apply.
Over the ten-year period, 2015/2016 to 2024/2025, the Council has made awards
including micro grants of £15.6m from the Community Benefit Funds to 984 projects
and attracted £20.6m in other funding. 
3.3.  The agreements around the provision of community benefit oblige the Council to
administer these funds using the REF mechanism. This task is undertaken by
Enterprise and Sustainable Development Services who is responsible for all aspects,
from securing the contributions from the developers, advising potential applicants,
assessing applications and monitoring projects to ensure that the community
benefits associated with each project are delivered. The Service continually seeks
ways to maximise the community benefit for all eligible communities across South
Lanarkshire.
11
101

Page 102

3.4.  Between the various funds £4,936,588 has been administered in 2024/2025. Apart
from one-off capitalised payments, the funds receive income for the duration of each
windfarm’s operational life and, typically, recurring annual payments which rise in
line with the Retail Price Index. The operation of the Council’s Community Benefit
Policy, with emphasis on the renewable energy sector has proven to be a success
with communities accessing funding for a diverse range of locally based projects. 
3.5.  Alongside these established windfarm developments and their associated
Community Benefit Funds, there is several other potential wind farm developments
throughout South Lanarkshire which are subject to planning approval. It is, therefore,
possible that subject to appropriate agreements being put in place, the level of
community benefit funding available to communities will increase over the next 10
years. If promoted and managed well, this increase will have a significant positive
impact on the eligible communities. 
3.6.  Although Enterprise and Sustainable Development Services lead in the delivery of
Community Benefit Funds, there is a significant level of consultation and cooperation
across a wide range of Council services. This ensures that applicants receive
support and advice to ensure the projects being developed meet the needs and
aspirations of the community; are of a high quality and are delivered efficiently and
effectively. 
3.7. It should be noted that there are also windfarm funds within South Lanarkshire which
are administered out with the scope of the Council’s Renewable Energy Fund. These
include SSE Clyde Extension, Auchrobert Community Benefit Fund, Ventient,
Galawhistle Community Benefit Fund, Ventient Glenkernie Community Benefit Fund
and Kypemuir and OnPathEnergy Kypemuir Community Benefit Fund. 
3.8. During 2023, a review of the guidance and priorities for the REF was undertaken and
amendments were approved at the Community and Enterprise Resources
Committee on 6 February 2024 in the report Renewable Energy Fund -
Strengthening Links to Rural Priorities. These amendments took effect immediately
and applications are now progressing through the approval stages taking account of
the amendments. 
4.  Renewable Energy Fund (REF) - Projects Approved During 2024/2025
4.1.  There are currently 42 windfarm developments contributing to the REF operating
across South Lanarkshire at the following locations:- Andershaw, Auchrobert, Bank
End Rig, Blacklaw, Blantyre Muir, Burnbrae, Calder Water, Climpy, Couplaw,
Dungavel, Dykehead, Eastertown, Gallawhistle, Garelwood, Greenwall, Greenhall
View, Haspielaw, High Blackwood Yard, High Dyke, JJ’s Farm, Lampits, Letham,
Millburn, Muirhall, Muirhall Extension, Middlemuir, Netherfauldhouse, Nether
Kypeside, North Brackenridge, Nutberry, Pates Hill, Rench Farm, Tanhill, Upper
Haywood, West Browncastle, Westtown, Whitehill, Whitelee, Woodlands, Yards
Farm, Kypemuir, Douglas West. 
4.2.  During 2024/2025, contributions of £3,539,483 (including interest) were received
from the operating companies, incorporating both annual payments and “one off”
payments. 
102

Page 103

4.3. A diverse range of projects across South Lanarkshire have been supported. A
complete list of projects supported in the last financial year is attached at Appendix
1. A total of 102 projects have been supported with total grants of £3,688,950
towards total project costs of £5,383,301 giving an average grant award of £36,166
towards an average project cost of £52,777 at a 68% intervention rate. 
4.4. Since 2018, the REF has funded microgrants available to all community councils or
similar geographically based organisations in South Lanarkshire. In 2024/2025, 25
community councils or similar organisations such as residents’ associations and
community trusts were awarded micro grants totalling £107,786. Details of these
awards are set out in Appendix 2.   
4.5. Taking REF grants and the micro grants awards together a total of 127 grants were
awarded during 2024/2025 with a total value of £3,796,736. This is an increase on
the 87 grants and a total grant value of £1,104,060 reported in 2023/2024. 
5.  Quarry Fund Projects Approved During 2024/2025
5.1.  There are currently six quarry developments contributing funds operating across
South Lanarkshire at the following locations: - Snabe, Thirstone, Annisten,
Newbigging, Cloburn and Ryeflat quarries. 
5.2.  During 2024/2025, contributions of £9,677 (including interest) were received from the
operating companies’ which is generated at 5p per ton quarried. 
5.3. The Fund supported three new projects with a combined grant award of £39,998
using funds generated in previous years and giving an average grant award of
£13,332. A complete list of projects supported in the last year is attached at
Appendix 3. 
6.  Clyde Wind Farm Fund (CWFF) Projects – 2024/2025
6.1.  During 2024/2025, the CWFF received total contributions of £1,387,428 including
interest payments. 
6.2.  The Fund supported 15 new projects with a combined grant award of £653,175. The
overall value of these projects was £1,381,457 giving an average grant award of
£43,454 towards an average project cost of £92,097 - a 47% intervention rate. A
complete list of projects supported in the last year is attached at Appendix 4. 
6.3. In 2017, a micro grant fund was introduced for six Community Councils within the
area Biggar, Quothquan & Thankerton, Duneaton, Leadhills, Crawford & Elvanfoot
and Symington. Community councils could apply for a £5,000 grant per annum to
award to small projects within their area at a maximum of £500.   
6.4. During 2024/2025, 7 grants were made to community councils within the area
totalling £32,394 details are provided in Appendix 5. 
6.5. Taking CWFF grants and the micro grants awards together a total of 22 grants were
awarded with a value of £685,571. This is an increase on the 14 grants awarded but
a decrease on total grant value of £1,183,916 reported in 2023/2024.
103

Page 104

7. Annual Report publicity
7.1. Grants are publicised through the Council’s View and social media accounts with the
purpose of raising the awareness of the Community Benefit Funds and their support
of communities. In addition, a publicity document for 2024/2025 will be prepared
highlighting projects funded in the year or recently completed. 
7.2. This annual report will be circulated and publicised digitally, and copies will be made
available for councillors and groups. 
8.  Employee Implications
8.1.  The Funds will continue to be managed within existing resources. 
9.  Financial Implications
9.1.  There are no financial implications to the Council. No funding offers are issued
without income from the respective developments being in place. 
10. Climate Change, Sustainability and Environmental Implications
10.1. Environmental sustainability is one of the appraisal considerations and applicants
are encouraged to consider and include good environmental practices within
projects. In the current year there are several projects which have helped deliver
environmental improvements or energy efficiency for groups. These include:- 
 Rural Development Trust Sustainable Travel
 Strathaven Airfield Ltd Electric Robot Runway Mower
 Rural Development Trust Solar PV Panels
 Strathaven Scout and Guide Centre Hall Management Committee Replacement
of Inefficient Boilers 
11.  Other Implications
11.1. The risks falling on the Council in the administration of Community Benefits are
reputational. Management of the funds are subject to the Council’s normal financial
scrutiny and reporting arrangements. By not undertaking this work, the Council
would not be acting consistently in support of its adopted policy and there would be
a risk that funds would not be distributed timeously and equitably to eligible
community organisations. 
12.  Integrated Impact assessment and Consultation Requirements
12.1.  This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
12.2.  All necessary and appropriate consultations are undertaken within the Council, with
partner organisations and community groups as part of the grant process. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 April 2025 
104

Page 105

Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs
 Ambitious, self-aware and improving 
 We will work towards a sustainable future in sustainable places
 Our children and young people thrive 
 Good quality, suitable and sustainable places to live 
 Caring, connected, sustainable communities 
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee 6 February 2024 - Renewable Energy
Fund - Strengthening Links to Rural Priorities. 
 Community and Enterprise Resources Committee Report 16 February 2021 Renewable
Energy Fund - Micro Grants Fund 
 Community and Enterprise Resources Committee Report – Community Benefits Funds
Annual Report 16 June 2020
 Executive Committee Report – 21 November 2018 Renewable Energy Fund Community
Benefit Fund Proposed Amendments 
 Executive Committee Report – Clyde Windfarm Community Benefit Fund – Proposed
Amendments to Fund Management and Administration 8 March 2017 
 Executive Committee 3 March 2004 – Community Benefit and the establishment of a
Renewable Energy Fund 
List of Background Papers
 List of all projects supported by the REF Community Benefit Funds
 List of all projects supported by the Clyde Windfarm Community Fund 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Colin McFarlane, 
Project Development Officer, 
Enterprise and Sustainable Development Services 
Mobile: 07385428577 
E-mail: colin.mcfarlane@southlanarkshire.gov.uk 
105

Page 106

APPENDIX 1
Organisation Name
Wind Farm Type of Group Organisation Town Project Project Cost Grant Approved Rate %
Douglasdale Recreation Enviroment Access and Leisure Group Andershaw Community Douglas Community Sound System  £35,939 £11,757 32
Lowther Men's Shed Andershaw Community Leadhills Relocation Refurbishment Works £157,114 £94,269 60
Leadhills Golf Club Andershaw Sport Leadhills Architect Fees £12,141 £12,141 100
Douglas Primary School Parent Council  Andershaw Community Douglas Wildflower Sensory Garden  £4,320 £4,320 100
Douglas St. Bride's Community Group Andershaw Community Douglas Sustainability Staffing Costs  £20,000 £20,000 100
Douglas Community Development Company Andershaw Community Douglas Crabtree Park Design Stage £19,500 £19,500 100
Glespin Community Group Scio Andershaw SCIO Glespin Housing Regeneration Project £10,000 £10,000 100
Rigside and Douglas Water Tenants and Residents Association Andershaw Community Rigside Rigside Community Hub - Survey Fee £1,880 £1,880 100
Douglas Primary School Parent Council  Andershaw Community Douglas Residential Trip  £6,012 £6,012 100
Abington Primary School Andershaw Community Abington Gruffalo Sculpture £20,000 £20,000 100
Leadhills Community Company Limited  Andershaw Community Leadhills Consultation & Legal Fees £10,120 £10,120 100
Larkhall Community Growers Auchrobert Community Larkhall Larkhall Community Plan Priorities £65,000 £30,000 46
Crossford Community Hall Auchrobert Community Crossford Hall Sustainability £20,000 £20,000 100
Rural Development Trust Auchrobert Trust Douglas Water Make Your Way: Connecting Greenspaces £53,821 £19,911 37
Friends of Stonehouse Park Auchrobert Community Stonehouse Restoration Works £52,840 £49,840 94
Lesmahagow Community Football Club Auchrobert Sport Lesmahagow McKirdy Pitch Refurbishment £153,911 £153,911 100
Coalburn Bowling Club Auchrobert Sport Coalburn Toilets Upgrade £53,136 £33,136 62
Coalburn Brass Band Family Auchrobert Community Coalburn Youth Course Fees  £8,600 £4,675 54
Netherburn Hall Management Committee Auchrobert Community Netherburn Hall Sustainability £20,000 £20,000 100
Friends of Stonehouse Park Bank End Rig Community Stonehouse The Pavilion Restoration £229,500 £199,500 87
Sandford and Upper Avondale Community Council  Bank End Rig Community Sandford Sandford Hall Car Park £99,042 £54,042 55
Avondale Radio Bank End Rig Community Glassford Radio Equipment £14,049 £14,049 100
Carluke Bowling Club Black Law Sport Carluke Toilet Upgrade £34,700 £14,700 42
Lanark Community Development Trust Black Law Trust Lanark Operations and Development Officer £64,000 £41,136 64
Forth & District Initiative Black Law Community Forth Forth Eco Site refurbishment £18,486 £18,486 100
106

Page 107

Organisation Name Wind Farm Type of Group Organisation Town Project Project Cost Grant Approved  Rate %
Upperward Mountaineering Club (and walking) Black Law Sport Lanark Walking Hiking Equipment  £6,122 £6,122 100
Cargill House Club Black Law Charity Lanark Warm Space Contribution £45,210 £9,000 20
Castlehill Bowling Club  Black Law Sport Carluke Lounge Refurbishment £59,059 £20,000 34
Clydesdale Community Concert Band Black Law Community Carluke Orchestral Percussion Instruments £9,333 £9,333 100
Law Boxing Club Black Law Sport Law Hall Sustainability £11,039 £11,039 100
Law Boxing Club Black Law Sport Law Fitness Equipment £12,878 £12,878 100
Clydesdale Citizens Advice Bureau Black Law Charity Lanark Feasibility study £19,440 £19,440 100
Crossford Playgroup Black Law Community Crossford Outdoor Space Fencing £2,750 £2,750 100
Clydesdale Housing Association Black Law Charity Lanark Video Conference Equipment £9,576 £9,240 96
The Haven  Black Law Charity Forth Facility Utilities £20,000 £20,000 100
Lanark Bowling Club Black Law Sport Lanark Toilet Upgrades £24,896 £20,000 80
Braidwood Community Group Black Law Community Braidwood Playpark Project £109,998 £66,462 60
Lanark Community Development Trust Black Law Trust Lanark Educational Gardener £33,960 £13,960 41
Tarbrax Common & Village Hall Trust Black Law Trust Tarbrax Community Garden Works £5,821 £5,821 100
WATIF Black Law/Muirhall Stallashaw/Pateshill Community Auchengray Loanhead Farm Refurbishment £374,118 £200,000 53
Larkhall Youth Pipes and Drums Blantyre Muir & Garlewood Community Larkhall Kilts n Blazers £7,500 £7,500 100
Strathaven Airfield Ltd Calder Water Community Strathaven Electric Robot Runway Mower £29,928 £13,928 47
Strathaven Town Mill Arts and Heritage Centre Calder Water Community Strathaven Restoration of Stonework £56,231 £56,231 100
Albert FC Ltd Calder Water Sport Stonehouse Facility Sustainability £20,000 £20,000 100
Albert FC Ltd Calder Water Sport Stonehouse Maintenance & Machinery £3,307 £3,307 100
Strathaven Tennis Club Calder Water Sport Strathaven Park Pavilion Sustainability £20,000 £20,000 100
Climate Action Strathaven Calder Water Charity Strathaven Retrofit Property Design £7,010 £7,010 100
Rotary Club of Strathaven Calder Water Community Strathaven Branded Gazebo £1,754 £1,704 97
Kilncadzow Village Hall Association Climpy Community Kilincadzow Hall Upgrades £9,504 £9,504 100
Coalburn Community Action group Douglas West Community Coalburn Path upgrade £58,410 £28,410 49
107

Page 108

Organisation Name Wind Farm Type of Group Organisation Town Project Project Cost Grant Approved Rate %
Rural Development Trust Douglas West Trust Douglas Water Poneil to Douglas Active Travel Path £289,446 £189,446 65
Healthy Valleys Douglas West Community Douglas Valley Gear Up Active Travel £295,024 £177,544 60
Douglas Community Development Company Douglas West Community Douglas Property Surveys £6,222 £6,222 100
Douglas Water and Rigside Old Age Pensioners Association Douglas West Community Rigside Centenary Celebrations £2,485 £2,485 100
Coalburn Miners Welfare Charitable Society Douglas West Charity Coalburn Ladies Toilet Refurbishment £15,192 £15,192 100
Lesmahagow Community Council  Douglas West Community Lesmahagow Planters £13,953 £13,953 100
Rigside and Douglas Water Tenants and Residents Association Douglas West Community Rigside Community Newsletter £980 £980 100
Coalburn Miners Welfare Charitable Society Douglas West Charity Coalburn Path Resurface £14,400 £14,400 100
Glassford Community Group Dungavel Community Glassford Design Costs £60,526 £20,000 33
Healthy Valleys Gallawhistle Charity Douglas Valley Gear Up £103,762 £18,698 18
The Rural Development Trust Gallawhistle Trust Douglas Water Solar PV Panels £32,027 £6,406 20
Sandford and Upper Avondale Community Council  Kype Muir Community Sandford Community Woodland Path  £24,300 £12,300 51
Lesmahagow Development Trust Kype Muir Trust Lesmahagow Property Conversion £225,000 £200,000 89
Outreach Community Church Kype Muir Community Strathaven Youth Peer Support Group £59,280 £59,280 100
Climate Action Strathaven Kype Muir Charity Strathaven Car Club £2,500 £2,500 100
Blackwood and Kirkmuirhill Resilience Group  Kype Muir Community Kirkmuirhill  Senior & Youth Groups £23,795 £11,898 50
Friends of Stonehouse Park Kype Muir Community Stonehouse Wind & Watertight Works £19,980 £19,980 100
Hollandbush Golf club Kype Muir Sport Lesmahagow Legal Fees £14,950 £14,950 100
Rural Development Trust Middle Muir Trust Douglas Water Coalburn to NCN 74 Active Travel Path  £258,719 £158,719 61
Crawford Carpet Bowling Club Middle Muir Sport Crawford New Boards for the Club £6,961 £6,961 100
Wiston Lodge Middle Muir Charity Wiston Opening Doors - pilot £24,072 £20,000 83
Crawford Elvanfoot and Daer Action Resource  Middle Muir Community Crawford Hall Sustainability £18,375 £18,375 100
Crawford Bowling Club Middle Muir Sport Crawford Waste water connection £24,044 £20,000 83
Lodge Abington Arbory 1081  Middle Muir Community Abington  Hall/Toilet Upgrade £17,351 £17,351 100
Abington Community Development Group Middle Muir Community Abington Community Garden Works £19,500 £19,500 100
108

Page 109

Organisation Name Wind Farm Type of Group Organisation Town Project Project Cost Grant Approved Rate %
Crawford Primary School Middle Muir Community Crawford Community Digital Skills £7,380 £7,380 100
Lodge Abington Arbory1081 Middle Muir Community Abington  Disabled Ramp/Kitchen Installation £17,140 £17,140 100
Crawford Primary School Parent Council Middle Muir Community Crawford Circus Skills Workshop  £3,573 £3,573 100
Leadhills Golf Club Middle Muir  Sport Leadhills Leadhills Golf Club Rebuild £440,358 £290,000 66
Rural Development Trust Middle Muir/Mains Hill Trust Trust Douglas Water Coalburn to Poneil Active Travel Path £386,679 £286,679 74
Biggar and District Men's Shed Muirhall Community Elsrickle Asset Transfer Purchase £9,600 £9,600 100
Pettinain Hall Community Group Muirhall 2 Community Pettinain Hall Sustainability £19,012 £19,012 100
Welcome All Hub Muirhall Stallashaw Community Carstairs Junction Regeneration Project £193,332 £70,897 37
Carnwath Bowling Club Muirhall Stallashaw Sport Carnwath Fire Safety and Carpet Renewal £10,063 £10,063 100
Carstairs Community Centre Management Group Muirhall Stallashaw Community Carstairs  Hall Sustainability £18,319 £18,319 100
The White Hall @ Braehead Muirhall Stallashaw Community Braehead Hall Sustainability £14,197 £14,197 100
Biggar and District Men's Shed Muirhall Stallashaw Community Elsrickle Solicitor Fees £5,400 £5,400 100
Blackmount Community Development Trust Muirhall Stallashaw Trust Elsrickle Community Event £887 £887 100
Soul Of The Junction SCIO Muirhall Stallashaw SCIO Carstairs Junction Hall Sustainability £17,968 £17,968 100
Dalserf Bowling Club Nether Kypeside Sport Ashgill Irrigation pump & Electrics £3,646 £3,646 100
Coal-Play  Nutberry Community Coalburn Recreation Area Upgrade £298,462 £223,462 75
Kirkmuirhill & Blackwood Men's Shed  Nutberry Community Kirkmuirhill  Survey Fees £1,740 £1,740 100
Tarbrax Common and Village Hall Trust Pates Hill Trust Tarbrax Village Hall Improvements £18,023 £16,023 89
Strathaven Scout & Guide Centre Hall Management Committee Wes Brown Castle Community Strathaven Replace Inefficient Boilers £25,716 £20,000 78
Hamilton Gymnastics Club Whitelee Sport Hamilton Gymnastic Equipment £20,046 £20,000 100
Eddlewood Football Association Whitelee Sport Hamilton Pitch Drainage £80,000 £40,000 50
The Westwood Community Hall Whitelee Community East Kilbride Hall Sustainability £18,738 £18,738 100 
Quarter Boolin Club Whitelee Sport Quarter Upgrade Works £13,161 £10,000 76
East Kilbride Indoor Bowling Club Whitelee Sport East Kilbride Community Café Refurbishment £11,728 £10,800 92
East Kilbride Cricket Club Whitelee Sport East Kilbride Indoor Mats & Training Aids £7,325 £7,325 100
109

Page 110

Organisation Name Wind Farm Type of Group Organisation Town Project Project Cost Grant Approved Rate %
Waist Not Want Not Whitelee Community East Kilbride Hall Sustainability 13,939 13,939 100
Care and Repair Lanarkshire  Woodlands Community Lanark New Data Base 12,080 8,000 66 
110

Page 111

Appendix 2
Organisation Name
Windfarm Group Type Award
Blackwood, Kirkmuirhill & Bogend Auchrobert  Community Council £4,890.00
Douglas CC Auchrobert  Community Council £4,356.00
Rigside & Douglas Water (Residents Assoc) Auchrobert  Residents Assoc £5,000.00
Sandford & Upper Avondale  Auchrobert Community Council £5,000.00
Stonehouse  Auchrobert  Community Council £5,000.00
Carluke  Black Law  Community Council £3,650.00
Carstairs Black Law  Community Council £4,650.00
Forth & District Development Trust Black Law  Trust £5,000.00
Lanark Black Law  Community Council £5,000.00
Larkhall Black Law Community Council £5,000.00
Tarbrax Woolford Auchengray & District CC Black Law Community Council £5,000.00
Burnside  Blantyre Muir Community Council £3,560.00
Hillhouse - Supporting Our Community* Blantyre Muir Community Council £5,000.00
Uddingston Blantyre Muir Community Council £5,000.00
Auldhouse & Chapelton Calder Water Community Council £3,500.00
Strathaven & Glassford Calder Water Community Council £5,000.00
Black Mount Muirhall Stallashaw Community Council £4,993.76
Pettinain  Muirhall Stallashaw Community Council £2,397.12
Blantyre Whitelees Community Council £4,940.00
Bothwell Whitelees  Community Council £5,000.00
Cambuslang Whitelees  Community Council £5,000.00
Earnock Residents Association Whitelees  Residents Assoc £5,000.00
East Mains  Whitelees Community Council £1,000.00
Jackton & Thortonhall Whitelees Community Council £750.00
Rutherglen Whitelees Community Council £4,100.00 
111

Page 112

Appendix 3
Organisation Name Windfarm Type of Group Project Location  Project Details  Project Cost Grant Approved  Rate %
Cambuslang Community Council Quarry Fund Community Cambuslang Cambuslang Community Hub £19,998 £19,998 100
Coulter Community Trust Quarry Fund Trust Coulter Coulter Hall £10,000 £10,000 100
The Thancard Trust Quarry Fund Trust Thankerton Thankerton Village Hall CAT Lite  £10,000 £10,000 100 
112

Page 113

Appendix 4
Organisation Name Windfarm Type of Group Project Location  Project Details  Project Cost Grant Approved  Rate %
Abington & District agricultural show Clyde Main Fund Community Abington Abington & District agricultural show -equipment  £5,759 £5,464 100
Biggar Kirk - Gillespie Centre Clyde Main Fund Community Biggar Lift Installation Disabled Access  £267,550 £198,551 74
Lowther Men's Shed Clyde Main Fund Community Leadhills Lowther Men's Shed - Phase 2-3 £45,360 £25,360 56
Biggar Corn Exchange Ltd. Clyde Main Fund Community Biggar Upgrading of community theatre lighting and sound systems £94,592 £70,945 75
Royal British Legion Scotland - Biggar & District Branch Clyde Main Fund Community Biggar Memorial Bench & Veterans Breakfast support £1,105 £1,105 100
Leadhills Golf Club Clyde Main Fund Sport Biggar Leadhills Golf Club Rebuild £440,358 £110,358 25
Abington Primary School Parent Council Clyde Main Fund Community Biggar Village Defibrillators £9,025 £9,025 100
Carmichael Community Council Clyde Main Fund Community Carmichael Village Sign Refurbishment £2,800 £2,800 100
Lowther Men's Shed Clyde Main Fund Community Leadhills Lowther Men's Shed Phase 4 £157,114 £62,846 40
Limelight Music Clyde Main Fund Community Glasgow Artistic Rhythms £31,085 £23,250 75
Leadhills Seniors Club Clyde Main Fund Community Biggar Leadhills Seniors Club £6,000 £6,000 100
Biggar Food Growing Group Community Interest Company Clyde Main Fund Community Biggar Market Garden & Employ A Manager £22,778 £17,084 75
Healthy Valleys Clyde Main Fund Charity Lanark Gear Up £295,024 £117,480 40
Coulter and Lamington Primaries Clyde Main Fund Community Biggar Pantomime/City Experience £692 £692 100
Duneaton Community Council Clyde Main Fund Community Biggar Community Bus Trips £2,217 £2,217 100 
113

Page 114

Appendix 5
Community Council
Windfarm Group Type Award
Biggar  Clyde Community Council £2,472.55
Carmichael Clyde Community Council £5,000.00
Crawford & Elvanfoot Clyde Community Council £4,921.60
Duneaton  Clyde Community Council £5,000.00
Leadhills Clyde Community Council £5,000.00
Quothquan & Thankerton Clyde Community Council £5,000.00
Symington Clyde Community Council  £5,000.00 
114

Page 115

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee 
Date of Meeting: 13 May 2025
Report by: Executive Director (Community and Enterprise
Resources)    
Subject: Larkhall Leisure Centre Progress Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on progress with regards to the replacement of Larkhall
Leisure Centre
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):- 
(1) that the changes to the project scope and programme, following the budget
decision to invest an additional £3.85m to increase games hall provision in the
new facility, be noted. 
3. Background
3.1. In February 2024, full Council approved an additional £12m to bridge the funding gap
for the replacement of Larkhall Leisure Centre.  This brought the total available funding
at that time to £23.9m, which enabled the project to progress. 
3.2. Following a robust procurement process, Hub Southwest Scotland Limited, in
conjunction with South Lanarkshire Council, appointed BAM Construction as the Tier
1 Contractor. 
3.3. Community and Enterprise Resources, along with colleagues in South Lanarkshire
Leisure and Culture (SLLC), worked closely with the design team to develop concept
designs in line with the available budget. These designs were informed by the
outcomes from a previous consultation exercise (Spring 2022), which identified that
the highest priorities for the community were swimming, gym, multipurpose space
suitable for fitness activities, and a health suite. Due to budget pressures, a like-for-
like replacement facility was not possible.   
3.4. Community engagement drop-in sessions to review the draft plans took place on 28/29
October and 7 November 2024 in Larkhall Leisure Centre, The Lighthouse and
Larkhall Academy. These sessions were well attended with strong support for the
swimming pool, gym and fitness suite design; however, negative feedback was
received regarding the lack of a games hall within the proposed plans. 
12
115

Page 116

3.5.  Officers are working to amend the contractual arrangements at Larkhall Academy to
improve access to the four court games hall and two gyms within the school, which is
located directly opposite the leisure centre. These halls can accommodate several
sports including badminton, indoor football and basketball. 
3.6.  In February 2025, full Council approved an additional £3.85m towards the Larkhall
Leisure Centre replacement project in order to increase the games hall provision within
the new facility. The total budget for the project now stands at £27.750m. This includes
Council funding of £21.850m, as well as City Deal, Shared Prosperity, Placed Based
Investment and Regeneration Capital Grant funding. 
4. Progress Update 
Design 
4.1.  The design team are currently re-developing the plans for the new centre, following
the budget announcement in February. These revised plans will include:- 
 a 3 court games hall suitable for badminton, pickleball and 5-aside football 
 25m, 6 lane swimming pool with moveable floor, spectators’ area, steam room
and sauna
 gym - to accommodate high spec cardiovascular and resistance equipment,
free weight training areas
 flexible fitness studio/community space – with adjoining tea prep area 
4.2. The project team will review the updated plans and ensure they fit within the
affordability cap before these can be shared with key stakeholders and the wider
community. 
Programme  
4.3.  The project had been due to commence on site in Autumn 2025, with an indicative
completion date of October 2027, however the recent change to project scope has
delayed the programme by approximately 7 months.  The key revised dates are noted
below: 
Key Milestones  Previous Programme Revised Programme 
Planning Submission February 2025      September 2025
Planning Committee June 2025      December 2025
Executive Committee Approval  September 2025      May 2026 
Start on Site  November 2025      June 2026 
Completion Date (indicative) October 2027      May 2028 
4.4.  It was previously advised that a partial demolition of the existing centre would be
required to enable the new build project to progress. However, given the increased
floor area associated with the inclusion of a 3 court games hall, there may now be a
requirement for a full demolition of the existing centre in order for works to progress
on site. This will have implications for SLLC and existing service users, and these will
be worked through once the extent of demolition is known. Plans to change the
Academy to a dual use facility may help to mitigate some service disruption. 
Consultation and Engagement 
4.5. A meeting will be arranged with key community representatives and local elected
members to discuss the revised plans (once available), as well as the potential impact
of a full demolition, if required.    
116

Page 117

4.6. Further community engagement drop-in sessions will then be arranged to enable the
wider community to review the revised designs. 
5.  Employee Implications
5.1. Employees within Housing and Technical Resources and Community and Enterprise
Resources will have a key role to play in managing this multi-million-pound project.
Colleagues within SLLC also have a valuable role in the wider project team in relation
to the operational requirements of the new facility. 
6.  Financial Implications
6.1. Funding for the project is summarised in section 3.7.   
7. Climate Change, Sustainability and Environmental Implications
7.1. The project will be striving towards Passivhaus standards. The design team will be
able to evidence the carbon and revenue savings for the new facility and this will be
reported in due course. 
8. Other Implications
8.1. There are no other implications or risks associated with this report. 
9.  Integrated Impact Assessment and Consultation Requirements
9.1.  An Integrated Impact Assessment is currently being progressed.   
9.2. Continued engagement will take place with local elected members and key community
representatives throughout the duration of the project. A project webpage is being
developed to provide the public with the latest updates and information about the
project. 
David Booth
Executive Director (Community and Enterprise Resources) 
23 April 2025 
Link(s) to Council Values/Priorities/Outcomes
 Focused on people and their needs. 
 We will work towards a sustainable future in sustainable places.  
 People live the healthiest lives possible. 
Previous References
 2024/2025 Capital Programme Update - Full Council, 21 February 2024
 2025/2026 Capital Programme Update – Full Council, 26 February 2025
 Larkhall Leisure Centre Replacement – CER Committee 26 November 2025 
List of Background Papers
 None 
117

Page 118

Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Gillian Simpson. Partner Liaison Manager 
Enterprise and Sustainable Development Services 
E-mail:  gillian.simpson@southlanarkshire.gov.uk
118