Agenda Document Pack - Community and Enterprise Resources Committee - 26/11/2024

South Lanarkshire Council · 26 November 2024
Back to Community and Enterprise Resources Committee — 26 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 18 November 2024 
Dear Councillor 
Community and Enterprise Resources Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Tuesday, 26 November 2024
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Robert Brown (Chair), Maureen Devlin (Depute Chair), Joe Fagan (ex officio), John Anderson,
Ralph Barker, Walter Brogan, Andy Carmichael, Gerry Convery, Poppy Corbett, Andrea Cowan,
Margaret Cowie, Colin Dewar, Gladys Ferguson-Miller, Ross Gowland, Graeme Horne, Cal
Johnston-Dempsey, Susan Kerr, Martin Lennon, Richard Lockhart, Hugh Macdonald, Ian McAllan,
Kenny McCreary, Davie McLachlan, Carol Nugent, Helen Toner, David Watson 
Substitutes
Alex Allison, Ross Clark, Margaret Cooper, Allan Falconer, Alistair Fulton, Lynsey Hamilton, Ross
Lambie, Lesley McDonald, Elaine McDougall, Mark McGeever, Richard Nelson, Graham Scott,
David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Community and Enterprise Resources Committee
held on 17 September 2024 submitted for approval as a correct record.  (Copy
attached) 
5 - 14 
Monitoring Item(s) 
3 Community and Enterprise Resources - Revenue Budget Monitoring
2024/2025
Joint report dated 25 October 2024 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
15 - 24 
4 Community and Enterprise Resources - Capital Budget Monitoring
2024/2025
Joint report dated 30 October 2024 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
25 - 28 
5 Community and Enterprise Resources - Workforce Monitoring - July to
September 2024
Joint report dated 5 November 2024 by the Executive Directors (Finance and
Corporate Resources) and (Community and Enterprise Resources).  (Copy
attached) 
29 - 36 
6 Community and Enterprise Resource Plan: Quarter 2 Progress Report
2024/2025
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
37 - 74 
Item(s) for Decision 
7 Employment Land and Property Market Analysis Report
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
75 - 84 
8 Scottish Government Vacant and Derelict Land Fund Programme
2024/2025
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
85 - 90 
9 Community Benefit Funds - Renewable Energy Fund Grant Applications
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
91 - 100 
2

Page 3

Item(s) for Noting 
10  Employability Performance Update
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
101 - 120 
11  National Business District (NBD) Shawfield Update
Report dated 8 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
121 - 124 
12  Larkhall Leisure Centre Replacement
Report dated 7 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
125 - 130 
13  Centre West and East Kilbride Masterplan Update
Report dated 7 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
131 - 136 
14  Pavement Parking
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
137 - 144 
15  UK Shared Prosperity Fund Progress Report
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
145 - 158 
16  Lanarkshire Business Excellence Awards
Report dated 18 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
159 - 162 
17  Update of the Community and Enterprise Resources Risk Register and
Risk Control Plan
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
163 - 188 
18  Notification of Contracts Awarded: 1 April 2024 to 30 September 2024
Report dated 5 November 2024 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
189 - 194 
Urgent Business 
19  Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Tracy Slater
Clerk Telephone: 07385 370089
Clerk Email: tracy.slater@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

COMMUNITY AND ENTERPRISE RESOURCES COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 17 September 2024 
Chair:
Councillor Robert Brown 
Councillors Present:
Councillor John Anderson, Councillor Ralph Barker, Councillor Walter Brogan, Councillor Andy
Carmichael, Councillor Ross Clark (substitute for Councillor Helen Toner), Councillor Gerry
Convery, Councillor Andrea Cowan, Councillor Margaret Cowie, Councillor Maureen Devlin
(Depute), Councillor Colin Dewar, Councillor Allan Falconer (substitute for Councillor Davie
McLachlan), Councillor Gladys Ferguson-Miller, Councillor Ross Gowland, Councillor Graeme
Horne, Councillor Cal Johnston-Dempsey, Councillor Susan Kerr, Councillor Richard Lockhart,
Councillor Ian McAllan, Councillor Kenny McCreary, Councillor Carol Nugent, Councillor David
Watson 
Councillors' Apologies:
Councillor Poppy Corbett, Councillor Joe Fagan (ex officio), Councillor Martin Lennon, Councillor
Hugh Macdonald, Councillor Davie McLachlan, Councillor Helen Toner 
Attending:
Chief Executive’s Service
J Kerr, Community Engagement Manager; T Little, Head of Communications and Strategy
Community and Enterprise Resources
D Booth, Executive Director; A Brown, Head of Enterprise and Sustainable Development Services;
C Brown, Environmental Services Manager; F Carlin, Head of Planning and Regulatory Services; K
Carr, Head of Facilities, Waste and Grounds Services; D Hashagan, Employability Manager; K
Lean, Economic Development Manager (Funding and Rural); C Park, Head of Roads,
Transportation and Fleet Services
Finance and Corporate Resources
G Booth, Finance Manager (Strategy); L Harvey, Finance Manager (Resources); E Maxwell, HR
Business Manager; K McLeod, Administration Assistant; T Slater, Administration Adviser 
1 Declaration of Interests 
The following interest was declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Anderson Employability Service Board Member of
Routes to Work South 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Community and Enterprise Resources Committee held on 18
June 2024 were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
2
5

Page 6

3 Community and Enterprise Resources - Revenue Budget Monitoring 2023/2024 
A joint report dated 20 August 2024 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April 2023 to 31 March 2024
for Community and Enterprise Resources. 
The year end position for the Resource was a breakeven position after approved transfers to
reserves. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in appendices B to F of the report. 
The Committee decided: 
(1) that the Community and Enterprise Resources’ outturn position as at 31 March 2024 of a
breakeven position, after approved transfers to reserves, as detailed in Appendix A of the
report, be noted; and 
(2) that the budget virements, as detailed in appendices B to F of the report, be approved. 
[Reference: Minutes of 23 April 2024 (Paragraph 3)] 
4 Community and Enterprise Resources - Revenue Budget Monitoring 2024/2025 
A joint report dated 20 August 2024 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the actual
expenditure measured against the revenue budget for the period 1 April to 12 July 2024 and
providing a forecast for the year to 31 March 2025 for Community and Enterprise Resources. 
A Service Analysis Statement, which outlined key highlights by Service for the Resource, was
provided at Appendix A to the report.  The detailed financial position, with variance explanations
by budget category, was provided in appendices B to G of the report. 
At 12 July 2024, the projected outturn position for the Resources was a breakeven position. 
Virements, proposed to realign budgets across budget categories and with other Resources,
were detailed in appendices C to G of the report. 
Officers responded to members’ questions in relation to employee costs, overtime costs and
financing charges. 
The Committee decided: 
(1) that the forecast to 31 March 2025 of a breakeven position, as detailed in Appendix A of
the report, be noted; and 
(2) that the budget virements, as detailed in appendices C to G of the report, be approved. 
5 Community and Enterprise Resources - Capital Budget Monitoring 2023/2024 
A joint report dated 21 August 2024 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the progress of the
Capital Programme for Community and Enterprise Resources for the period 1 April 2023 to 31
March 2024.
6

Page 7

The total Capital Programme for 2023/2024 was £45.177 million and remained unchanged since
the last update to Committee on 23 April 2024.  The financial position for Community and
Enterprise Resources was provided in Appendix A to the report. 
Expenditure to 31 March 2024 was £33.935 million which reflected an underspend of £11.242
million in comparison to the programme of £45.177 million.  The underspend was mainly due to 
the timing of project spend on Roads, Transport and Fleet projects (£4.995 million), Enterprise
and Sustainable Development projects (£4.769 million) and Facilities, Waste and Grounds
projects (£1.478 million).  Any underspend on those projects, including the funding, would be
carried forward into the next financial year, as required. 
Information was also provided on accounting adjustments. 
The Committee decided: that the Community and Enterprise Resources’ Capital
Programme of £45.177 million, and expenditure for the
year of £33.935 million, be noted. 
[Reference: Minutes of 23 April 2024 (Paragraph 4)] 
6 Community and Enterprise Resources - Capital Budget Monitoring 2024/2025 
A joint report dated 21 August 2024 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted advising of progress on
the Community and Enterprise Resources’ Capital Programme 2024/2025 and summarising the
expenditure position at 12 July 2024. 
The Capital Programme for 2024/2025 for the Resource amounted to £62.172 million and was
based on the programme of projects approved by Council on 21 February 2024 and the overall
Capital Programme for 2024/2025, approved by the Executive Committee on 4 September
2024.  This also included adjustments totalling a net increase of £11.598 million, as detailed in
Appendix A to the report. 
Appendix A also provided a forecast for the financial year of £62.172 million and actual
expenditure to 12 July 2024 of £3.378 million. 
The Committee decided: that the Community and Enterprise Resources’ capital
programme of £62.172 million, and expenditure to date of
£3.378 million, be noted. 
[Reference: Minutes of the special meeting of South Lanarkshire Council of 21 February 2024
(Paragraph 4) and Minutes of the Executive Committee of 4 September 2024
(Paragraph 4)] 
7 Community and Enterprise Resources - Workforce Monitoring – April to June
2024 
A joint report dated 8 August 2024 by the Executive Directors (Finance and Corporate
Resources) and (Community and Enterprise Resources) was submitted on the following
employee information for Community and Enterprise Resources for the period April to June
2024:- 
 attendance statistics
 occupational health statistics
 accident/incident statistics
 disciplinary hearings, grievances and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 11 June 2024
7

Page 8

Having responded to members’ question in relation to delays to requests for ill health retirement
and the apparent under reporting of near miss incidents, the HR Business Manager undertook to
take the member’s comments on encouraging near miss reporting back to the Health and Safety
Manager. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 18 June 2024 (Paragraph 3)] 
Councillor Kerr left the meeting during consideration of this item of business 
8 Employability Service 
A joint report dated 23 August 2024 by the Executive Directors (Community and Enterprise
Resources) and (Finance and Corporate Resources) was submitted providing an update on the
Employability Service. 
The Employability Service, responsibility for which had transferred to Community and Enterprise
Resources on 1 April 2024, delivered and funded a range of employability programmes to
unemployed people, and work-based learning opportunities to school pupils in S4 to S6.  Those
programmes were reliant on a range of external funding sources, supported by core Council
budgets. 
Information was provided on:- 
 the Scottish Government’s No One Left Behind (NOLB) programme, through which a
range of funding streams had been devolved to Local Employability Partnerships (LEPs)
via local authorities
 the NOLB grant award to the Council for 2024/2025
 the requirement to submit an Annual Investment Plan as part of the NOLB grant process,
attached as Appendix 1 to the report
 the role of Routes to Work South (RTWS) in delivering a significant element of the Annual
Investment Plan and the proposal to award a contract to RTWS, supported by Teckal
arrangements, for the delivery of 2024/2025 employability services
 the programmes delivered in-house by the Council’s Employability Service, including the
GradU8 and Foundation Apprenticeship programmes 
To support the work of the Employability Service, as outlined in the report, it was proposed that:- 
 the following temporary posts be added to the establishment, subject to NOLB funding
confirmation:- 
 1 post of Employability Adviser on Grade 4, Level 2, SCP 82-83 (£49,108 to £49,874)
 3 posts of Team Leader on Grade 3, Level 2, SCP 63-65 (£37,866 to £38,706)
 5 posts of Vocational Development Worker on Grade 2, Level 4, SCP 55-57 (£33,797
to £34,764)
 a consortium agreement with South Lanarkshire College and New College Lanarkshire be
developed for the delivery of the 2024/2025 Foundation Apprenticeship programme
 a partnership agreement with South Lanarkshire College, New College Lanarkshire and
Glasgow Kelvin College be developed for the delivery of GradU8 for the 2024/2025
academic year 
Officers responded to a member’s question in relation to continued support into employment for
those with additional support needs and advised that further reports on the Employability Service
would be submitted to future meetings of the Committee.
8

Page 9

The Committee decided: 
(1) that the Scottish Government’s grant award for No One Left Behind be noted; 
(2) that the 2024/2025 Annual Investment Plan be noted; 
(3) that the award of the Routes to Work South Teckal contract be approved; 
(4) that the 9 temporary posts, as detailed in the report, be added to the Community and
Enterprise Resources’ staffing establishment, subject to funding confirmation; 
(5) that the proposal to develop a consortium agreement with South Lanarkshire College and
New College Lanarkshire for the delivery of the 2024/2025 Foundation Apprenticeship
programme be approved; and 
(6) that the proposal to develop partnership agreements with South Lanarkshire College, New
College Lanarkshire and Glasgow Kelvin College for the delivery of GradU8 for the
2024/2025 academic year be approved. 
Councillor Anderson, having declared an interest in the above item, withdrew from the meeting
during its consideration 
9 Community Benefit Funds – Renewable Energy Fund – Grant Applications 
A report dated 23 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on 3 applications to the Renewable Energy Fund (REF).  This
community benefit funding, secured from windfarm developers, had been established to provide
funding to suitable projects providing community benefits in eligible areas. 
It was proposed that, subject to the applicants providing written confirmation that all other
additional funding for the projects had been secured, a grant be awarded up to a maximum of:- 
 £40,000 towards eligible costs associated with improving the football pitch drainage to
Eddlewood Football Association from Whitelee Windfarm REF
 £94,268.63 towards eligible costs associated with a building installation and refurbishment
to Lowther Men’s Shed from Andershaw REF
 £200,000 towards eligible costs associated with the refurbishment of a community café
and funding for a 2-year manager post to Woolfords, Auchengray and Tarbrax
Improvement Foundation from Blacklaw, Muirhallstallowshaw and Pateshill REF 
The Committee decided: that, subject to the applicants providing written confirmation
that all other funding for the projects had been secured, a
grant be awarded of up to a maximum of:- 
 £40,000 towards eligible costs associated with
improving the football pitch drainage to Eddlewood
Football Association from Whitelee Windfarm REF
 £94,268.63 towards eligible costs associated with a
building installation and refurbishment to Lowther
Men’s Shed from Andershaw REF
 £200,000 towards eligible costs associated with the
refurbishment of a community café and funding for a
2-year manager post to Woolfords, Auchengray and
Tarbrax Improvement Foundation from Blacklaw,
Muirhallstallowshaw and Pateshill REF 
9

Page 10

10 UK Shared Prosperity Fund – Grant Application 
A report dated 26 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on a grant application to the UK Shared Prosperity Fund (UKSPF). 
Information was provided on:- 
 the Council’s conditional allocation, in August 2022, of £12,221,811 from the UK
Government, providing a mix of capital and revenue funding for projects that met the
UKSPF investment themes
 the agreed approach to work as part of the Glasgow City Region with a single Investment
Plan
 the actions taken to ensure effective delivery of the UKSPF programme in South
Lanarkshire and minimise the risk of underspend
 the progress of community grant programmes being delivered under the Community and
Place Investment Priority of the UKSPF 
At its meeting on 18 June 2024, the Committee approved a grant award of up to £30,000 from
the Renewable Energy Fund to Larkhall Community Growers to employ a Development Officer. 
This funding was subject to match funding from the UKSPF and it was, therefore, proposed that
a grant of up to £35,000 be awarded to Larkhall Community Growers  from the UKSPF to match
fund the employment of a Development Officer.  £5,000 of the funding was to cover the cost of
participation in the Community Planning Partnership Place Pilot Programme.  Details were
provided in the report of the relevant business case for this funding and a breakdown of spend. 
Officers responded to members’ questions in relation to grant security and how members could
be informed of funds available at an earlier stage in the process, where it was possible and
appropriate. 
The Committee decided: 
(1) that a grant be awarded to Larkhall Community Growers of up to £35,000 from the UKSPF
to match fund the employment of a Development Officer and cover the cost of participation
in the Community Planning Partnership Place Pilot Programme; and 
(2) that the progress of the Community Grant Programmes being delivered under the
Community and Place Investment Priority of the UKSPF be noted. 
[Reference: Minutes of 18 June 2024 (Paragraph 6)] 
11 South Lanarkshire Council’s Food Service Plan for 2024/2025 
A report dated 23 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on the Council’s Food Service Plan for 2024/2025. 
Information was provided on the statutory duties placed on local authorities in relation to food,
which involved:- 
 carrying out official controls including inspections, audits, monitoring, surveillance or
sampling in food establishments
 ensuring that the statutory obligations were brought to the attention of local authority
officials and/or elected member bodies responsible for agreeing budgets or other service
arrangements relevant to the delivery of official controls
 completing an annual Service Plan which detailed the programme for the year, ensuring it
was adequately resourced and approved at the appropriate governance level within the
local authority
10

Page 11

The Council’s Food Service Plan for 2024/2025 was attached as Appendix 1 to the report. 
The Committee decided: that the Council’s Food Service Plan for 2024/2025, as
detailed in Appendix 1 to the report, be approved. 
[Reference:  Minutes of 7 November 2023 (Paragraph 8)] 
12 Ash Dieback Disease (ADD) 
A report dated 30 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the work undertaken in relation to Ash
Dieback Disease (ADD). 
ADD was the most significant tree disease to affect broadleaved trees in the UK since Dutch
Elm disease gained prominence in the 1960s and had spread rapidly in South Lanarkshire.  This
incurable disease, which affected only Ash species, caused the fungal pathogen Hymenscyphus
Fraxineus.  European data suggested that it would lead to the decline and death of 50% to 75%
of Ash trees in Scotland over 2 decades and had the potential to infect more than 75 million
trees across the country. 
Information was provided on:- 
 the work undertaken to inform the Council’s Ash Dieback Action Plan, attached as
Appendix 1 to the report, which identified the key actions required to try to address and
mitigate the consequences of this issue
 the current position in South Lanarkshire, with approximately 124,530 (85%) trees
identified that might impact on the Council’s duties (trees either managed or owned by the
Council, or in private ownership within falling distance of roads or public areas) 
In response to a member’s question, it was clarified that the figure at 5.3 of the Ash Dieback
Action Plan should have been £0.500 million and not £0.100 million.  Following a proposal by
the Chair, it was agreed that the report be referred to the Climate Change and Sustainability
Committee for information. 
The Committee decided: 
(1) that the work undertaken to date and the ongoing risk, management and financial
implications associated with the Ash Dieback Disease be noted; 
(2) that the Ash Dieback Action Plan, attached as Appendix 1 to the report, be approved,
subject to the correction at 5.3 as noted above; and 
(3) that the report be referred to the Climate Change and Sustainability Committee for
information. 
In terms of Standing Order No 14, the Chair adjourned the meeting at 3.00pm for a 5 minute period. 
The meeting reconvened at 3.05pm 
13 Air Quality Management Activity 
A report dated 19 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on the Air Quality Management Activity in South Lanarkshire. 
In terms of the Environment Act 1995 and associated Regulations, the Council had statutory
obligations to monitor, review and analyse the quality of air within its area.  If air quality
parameters were exceeded, an Air Quality Management Area had to be declared and an action
plan developed to address and improve the air quality standards in that area.
11

Page 12

Information was provided on:- 
 funding received for air quality initiatives
 Air Quality activities delivered in 2023/2024 with the funding secured
 activity planned for 2024/2025 
An officer responded to a member’s question in relation to future funding for the Beat the Street
programme. 
The Committee decided: that the report be noted. 
14 Sale of Nicotine Vapour Products Enforcement 
A report dated 23 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on the programme of enforcement undertaken
by Consumer and Trading Standards in relation to the sale of nicotine vapour products. 
Consumer and Trading Standards delivered the Council’s statutory duty to enforce the
provisions of Tobacco and Primary Medical Services (Scotland) Act 2010 and carried out a
programme of enforcement in relation to the age restriction requirements contained within the
Act.  The Act created a criminal offence for a business to sell vapes to anyone under the age of
18 years and, if contravened, a £200 fixed penalty notice could be issued, which was discounted
to £150 if paid within 14 days of issue. 
There had been a significant increase in complaints from the public, head teachers, elected
members and Police Scotland relating to the sale of single-use vapes to children in 2022/2023
and a test purchase exercise was included within the programme of enforcement for 2023/2024,
details of which were provided in the report. 
Officers responded to members’ questions in relation to the effectiveness of the sanctions
available to the Council and undertook to:- 
 provide information on the number of businesses which had paid a fine
 report back to committee on what action the Council was able to take through the
Licensing Board in relation to those shops that did not comply with the legislation
 report back to committee next year on the 2024/2025 enforcement programme 
The Committee decided: that the report be noted. 
15 Community Benefit Funds – Annual Report 
A report dated 23 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on grants awarded in 2023/2024 from the Community Benefit Funds
administered by the Council’s Enterprise and Sustainable Development Services. 
Community Benefit Funds had been established to provide funding to suitable projects providing
community benefits in eligible areas.  Details of the grants awarded in 2023/2024 were provided
in appendices 1 to 4 to the report. 
A publicity document for 2023/2024 would be prepared with the purpose of raising awareness of
the Community Benefit Funds and their support of communities.  This annual report would be
circulated and publicised digitally, with 100 copies made available to councillors and groups.
12

Page 13

The Committee decided: that the Community Benefit Funds administered by the
Council and the grants awarded under the Renewable
Energy Fund (REF), Clyde Wind Farm Fund (CWFF) and
Quarry Funds in 2023/2024 be noted. 
16 Roads Asset Management Plan 2024 - Update
A report dated 28 August 2024 by the Executive Director (Community and Enterprise
Resources) was submitted on the Roads Asset Management Plan (RAMP) 2024. 
The RAMP was a strategic framework that outlined the key principles and practices for the
effective management, maintenance and enhancement of the roads network and related
infrastructure.  The development of RAMPs across Scotland was an excellent example of
collaborative working across the 32 local authorities. 
Information was provided on:- 
 the 5 key principles of an effective RAMP
 the Council’s main roads asset groups 
 the overall condition of the infrastructure and issues for consideration 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 29 August 2023 (Paragraph 15)] 
Councillor Convery left the meeting during consideration of this item of business 
17 Urgent Business 
There were no items of urgent business. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Revenue
Budget Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the actual expenditure measured against the revenue
budget for the period 1 April to 4 October 2024 for Community and Enterprise
Resources
 provide a forecast for the year to 31 March 2025 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[re
(1) that the forecast to 31 March 2025 of a breakeven position, as detailed in
Appendix A of the report, be noted; and
(2) that the proposed budget virements be approved.
[1recs]
3. Background
3.1. This is the second revenue budget monitoring report presented to the Community and
Enterprise Committee for the financial year 2024/2025. 
3.2. The report details the financial position for Community and Enterprise Resources. 
Appendix A provides the service analysis statement, outlining key highlights by
Service for the Resource and Appendices B to G provides the detailed financial
position with variance explanations by budget category. 
3.3. This report reflects the actual spend to 4 October 2024 within the Resource budget
and reflects the expected outturn forecast on expenditure and income at this date. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. As at 4 October 2024, the Resource’s projected outturn position for 2024/2025 is a
breakeven position.  This is outlined in the attached appendices.    
3
15

Page 16

5.2. Virements are proposed to realign budgets across budget categories and with other
Resources.  These movements have been detailed in the appendices to this report,
as appropriate. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability, or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Revenue Budget is that there is an
overspend.  There are inflationary and budget pressures which could increase the risk
of overspend, however these are mitigated by additional funds being added to the
budget. 
7.2. The risk is managed through four weekly Budget Monitoring meetings at which any
variance is analysed.  In addition, the new forecasting within FUSION and work with
the Resource and finance teams, ensures early warning for corrective action to be
taken where appropriate.   
8. Integrated Impact Assessment and Consultation Requirements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function, or strategy and, therefore, no integrated impact
assessment is required. 
8.2. There was also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director, (Community and Enterprise Resources) 
25 October 2024 
Link(s) to Council Values/Priorities/Objectives
 Accountable, effective, efficient and transparent 
Previous References
 None 
List of Background Papers
 Financial Ledger and budget monitoring results to 4 October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Louise Harvey, Finance Manager
Ext:  2658 (Tel:  01698 452658)
Email: louise.harvey@southlanarkshire.gov.uk 
16

Page 17

Appendix A 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period 7 Ended 4 October 2024 (No. 7) 
Revenue Budget Monitoring Report – Service Analysis 
Service Analysis
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
% YTD Actual
(£000)
Facilities, Waste and Grounds Services 77,307 77,144 163 0.21% 36,454
Planning and Regulatory Services 4,659 4,464 195 4.19% 1,809
Leisure Services 21,738 21,750 (12) (0.06%) 13,205
Enterprise and Sustainable Development 5,874 5,803 71 1.21% 3,105
Roads, Transportation and Fleet Services 16,592 17,009 (417) (2.51%) 5,982
Net Controllable Exp. 126,170 126,170 0 0.00% 60,555 
Service  Explanation for significant projected outturn variances
Facilities, Waste
and Grounds
Services
The anticipated underspend is mainly due to turnover and staff vacancies, as well as increased income
for additional service requests within Street and Waste services.  The anticipated Service underspend
will be offset by overspends within the overall Resource. 
Planning and
Regulatory Services
The anticipated underspend is mainly due to staff vacancies and turnover within the Environmental
Services and Planning & Building Standards teams, and lower than budgeted costs for Scientific
Services within Environmental Services due to decreased demand.  These underspends are partially
offset by Planning applications and Building Warrants income is expected to be less than budget due
reduced applications.  The anticipated Service underspend will support the overall Resource balanced
budget position.   
Leisure Services No significant variances to report.
Enterprise and
Sustainable
Development
It is projected the Service will record a broadly balanced budget, with minor underspends within
employees, administration and an over recovery of income, being partially offset by greater costs on IT
equipment and leasing charges. 
Roads,
Transportation and
Fleet Services
A projected overspend is anticipated across the service, mainly due to reduced income within Parking
and Roads Construction Unit and increased costs associated with the upkeep of depots, IT annual
subscriptions, hired plant for winter and leasing charges within Roads. These overspends are partially
offset by an expected underspend within employee costs due to vacancies and staff turnover.  The
anticipated Service overspend will be managed within the overall Resource position.   
17

Page 18

Appendix B
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
Community and Enterprise Resources Summary 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 96,675 95,250 1,425 Under 1.47% 43,894 
Property Costs 9,732 9,823 (91) Over (0.94%) 4,523 
Supplies & Services 18,551 18,762 (211) Over (1.14%) 7,225 
Transport & Plant 22,395 22,788 (393) Over (1.75%) 7,699 
Administration Costs 798 816 (18) Over (2.26%) 284 
Payments to Other Bodies 16,396 16,388 8 Under 0.05% 6,442 
Payments to Contractors 38,302 38,439 (137) Over (0.36%) 22,334 
Transfer Payments 617 617 0 - 0.00% 459 
Financing Charges 197 214 (17) Over (8.63%) 10 
Total Controllable Exp. 203,663 203,097 566 Under 0.28% 92,870 
Total Controllable Inc. (77,493) (76,927) (566) Under (0.73%) (32,315) 
Net Controllable Exp. 126,170 126,170 0 - 0.00% 60,555 
Variance Explanations 
Variance explanations are shown in Appendices C-G as appropriate. 
Budget Virements 
Budget virements are shown in Appendices C-G as appropriate. 
18

Page 19

Appendix C 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
Facilities, Waste and Grounds Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 60,137 59,885 252 Under 0.42% 28,490 1,a,d
Property Costs 2,133 2,181 (48) Over (2.25%) 1,147 2,b,c,d
Supplies & Services 8,782 8,865 (83) Over (0.95%) 4,128 3,a,c,d
Transport & Plant 8,070 8,081 (11) Over (0.14%) 4,714 A
Administration Costs 181 188 (7) Over (3.87%) 100 E
Payments to Other Bodies 54 54 0 - 0.00% 33 
Payments to Contractors 18,060 18,097 (37) Over (0.20%) 8,947 a,d
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 45 45 0 - 0.00% 5 
Total Controllable Exp. 97,462 97,396 66 Under 0.07% 47,564 
Total Controllable Inc. (20,155) (20,252) 97 Over 0.48% (11,110) 4,d
Net Controllable Exp. 77,307 77,144 163 Under 0.21% 36,454 
Variance Explanations 
1. The forecast underspend in Facilities and Streets & Bereavement is due to staff turnover and is partially offset by an overspend in
Waste services due to overtime costs.
2. The forecast overspend is due to increased costs for cleaning and janitorial equipment within Facilities.
3. The forecast overspend is due to higher than budgeted costs for domestic bins within Waste and costs for commemorative items
within Bereavement services, which is recovered via income.  
4. An over recovery of income is forecast mainly due to additional service requests for street cleansing and for clearances within Waste
services.  These are partially offset by an under recovery in School meal income. 
Budget Virements 
a. Transfer from reserves in respect of Front Line First and Strategic Waste Fund. Net effect £1.219m: Employees £0.930m, Supplies
and Services £0.100m, Transport and Plant £0.074m, Payment to Contractor £0.115m.
b. Transfer from corporate items for rates poundage.  Net Effect £0.033m: Property £0.033m.
c. Removal of budget in respect of Procurement savings in 2024/2025. Net Effect £0.023m: Property (£0.010m), Supplies and Services
(£0.013m).
d. Realignment and establishment of budget to reflect service provision within Waste. Net effect £0.000m: Employees £0.065m,
Property £0.005m, Supplies and Services £0.127, Administration £0.005m, Payment to Contractor (£0.065m), Income (£0.137m). 
19

Page 20

Appendix D   
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
Planning and Regulatory Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 7,091 6,832 259 Under 3.65% 3,285 1
Property Costs 38 29 9 Under 23.68% 14 
Supplies & Services 166 199 (33) Over (19.88%) 93 2
Transport & Plant 126 129 (3) Over (2.38%) 44 
Administration Costs 110 129 (19) Over (17.27%) 77 
Payments to Other Bodies 235 215 20 Under 8.51% 30 
Payments to Contractors 443 443 0 - 0.00% 144 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 46 48 (2) Over (4.35%) 1 
Total Controllable Exp. 8,255 8,024 231 Under 2.80% 3,688 
Total Controllable Inc. (3,596) (3,560) (36) Under (1.00%) (1,879) 3
Net Controllable Exp. 4,659 4,464 195 Under 4.19% 1,809 
Variance Explanations 
1. The forecast underspend is mainly due to staff vacancies and turnover.
2. The forecast overspend is due to costs of an IT system upgrade within the Planning service.
3. The forecast predicts a lower level of income recovered from Planning applications and Building warrants.   
Budget Virements  
No budget Virements 
20

Page 21

Appendix E 
SOUTH LANARKSHIRE COUNCIL 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
South Lanarkshire Leisure and Culture 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 4 4 0 - 0.00% 3 
Property Costs 5,615 5,615 0 - 0.00% 1,891 
Supplies & Services 0 0 0 - 0.00% 0 
Transport & Plant 0 0 0 - 0.00% 0 
Administration Costs 8 8 0 - 0.00% 2 
Payments to Other Bodies 80 92 (12) Over (15.00%) 0 1
Payments to Contractors 16,031 16,031 0 - 0.00% 11,309 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 0 0 0 - 0.00% 0 
Total Controllable Exp. 21,738 21,750 (12) Over (0.06%) 13,205 
Total Controllable Inc. 0 0 0 - 0.00% 0 
Net Controllable Exp. 21,738 21,750 (12) Over (0.06%) 13,205 
Variance Explanations 
1. The forecast overspend relates to a predicted charge for the annual fireworks display at Strathclyde Park being greater than budget. 
Budget Virements 
No budget virements 
21

Page 22

Appendix F 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
Enterprise and Sustainable Development 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 8,026 7,942 84 Under 1.05% 3,217 1,a,b
Property Costs 246 249 (3) Over (1.22%) 45 
Supplies & Services 145 156 (11) Over (7.59%) 23 a
Transport & Plant 179 180 (1) Over (0.56%) 19 
Administration Costs 101 80 21 Under 20.79% 25 2,a
Payments to Other Bodies 10,653 10,653 0 - 0.00% 3,187 c
Payments to Contractors 0 0 0 - 0.00% 0 
Transfer Payments 0 0 0 - 0.00% 0 
Financing Charges 56 75 (19) Over (33.93%) 1 3
Total Controllable Exp. 19,406 19,335 71 Under 0.37% 6,517 
Total Controllable Inc. (13,532) (13,532) 0 - 0.00% (3,412) a
Net Controllable Exp. 5,874 5,803 71 Under 1.21% 3,105 
Variance Explanations 
1. The forecast underspend is mainly due to staff turnover within Economic Development and Support Administration.
2. A projected underspend is due to less costs anticipated for telephones and membership fees.
3. The forecast predicts an over spend on IT leasing costs. 
Budget Virements 
a. Realignment and establishment of budget within Support. Net Effect £0.000m: Employees £0.006m, Supplies and Services £0.021m,
Administration (£0.006m), Income (£0.021m). 
b. Transfer from reserves for strategic investments (Social Enterprise and Business Support, Locate in South Lanarkshire and Tourism
Cooperative and Strategy) and staff costs.  Net Effect £0.277m: Employees £0.157m, Payment to Other Bodies £0.120m.     
22

Page 23

Appendix G 
Revenue Budget Monitoring Report 
Community and Enterprise Resources Committee: Period Ended 4 October 2024 (No.7) 
Roads, Transportation and Fleet Services 
Revised
Annual
Budget
(£000)
Projected
Outturn
(£000)
Projected
Outturn
Variance
(£000)
Over /
Under %
YTD
Actual
(£000)
Notes
Employee Costs 21,417 20,587 830 Under 3.88% 8,899 1
Property Costs 1,700 1,749 (49) Over (2.88%) 1,426 2,a
Supplies & Services 9,458 9,542 (84) Over (0.89%) 2,981 3,b
Transport & Plant 14,020 14,398 (378) Over (2.70%) 2,922 4
Administration Costs 398 411 (13) Over (3.27%) 80 
Payments to Other Bodies 5,374 5,374 0 - 0.00% 3,192 
Payments to Contractors 3,768 3,868 (100) Over (2.65%) 1,934 5
Transfer Payments 617 617 0 - 0.00% 459 
Financing Charges 50 46 4 Under 8.00% 3 
Total Controllable Exp. 56,802 56,592 210 Under 0.37% 21,896 
Total Controllable Inc. (40,210) (39,583) (627) Under (1.56%) (15,914) 6
Net Controllable Exp. 16,592 17,009 (417) Over (2.51%) 5,982 
Variance Explanations 
1. The forecast underspend is mainly due to vacancies and staff turnover.
2. An overspend is forecast due to higher than budgeted costs for water and repairs & maintenance for Roads’ depots.
3. The forecast overspend mainly relates to increased costs for annual subscriptions for computer licences within Roads.
4. The forecast overspend is due anticipated increased external hire costs for winter plant. Furthermore higher than budgeted leasing
costs are anticipated within Roads Construction due to the increasing price of vehicle replacement.  The forecast overspend is also
partly due to greater than budgeted costs for outside repairs within the Fleet workshop.
5. The forecasted overspend is mainly due to higher than budgeted costs within the Structures Section for bridge repairs and statutory
inspections. Furthermore increased contractor costs are anticipated within the Traffic Section for maintenance of traffic lights. 
6. An under recovery of income is projected resulting from lower than budgeted parking income and reduced income from maintenance
works within Roads Construction. 
Budget Virements 
a. Transfer from corporate items for rates poundage.  Net Effect £0.008m: Property £0.008m.
b. Removal of budget in respect of Procurement savings in 24/25. Net Effect £0.002m: Supplies and Services (£0.002m). 
23

Page 24

24

Page 25

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources - Capital Budget
Monitoring 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide information on the progress of the capital programme for Community and
Enterprise Resources for the period 1 April 2024 to 4 October 2024
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Community and Enterprise Resources capital programme of £53.679
million, and expenditure to date of £9.193 million, be noted.
[1recs]
3. Background
3.1. This is the second capital monitoring report presented to the Community and
Enterprise Resources Committee for the financial year 2024/2025. Further reports
will follow throughout the year. 
3.2. The revised budget of £53.679 million for Community and Enterprise Resources is
based on the overall Capital Programme for 2024/2025 (June 2024), and includes
updates approved by the Executive Committee on 2 October 2024 (£0.051m
increase) and 13 November 2024 (£8.544m decrease).   
3.3. The report details the financial position for Community and Enterprise Resources in
Appendix A. 
4. Employee Implications
4.1. There are no employee implications as a result of this report. 
5. Financial Implications
5.1. 2024/2025 Budget   
As detailed in Section 3.2, the revised capital programme for Community and
Enterprise Resources is £53.679 million and includes budget amendments, totalling
a net decrease of £8.493 million, which have been approval by the Executive
Committee. The details of these amendments are shown in Appendix A.  
4
25

Page 26

5.2. 2024/2025 Forecast   
Appendix A shows a forecast for the financial year of £53.679 million. For
information, actual expenditure to 4 October 2024 is £9.193 million.   
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The main risk associated with the Council’s Capital Programme is that there is an
overspend.  The risk has been assessed as low given the detailed project
management plans prepared and monitored for each project.  The risk of overspend
is managed through four weekly Investment Management Meetings. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There is also no requirement to undertake any consultation in terms of the
information contained in the report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
30 October 2024 
Link(s) to Council Values/Ambitions/Objectives
 Accountable, Effective, Efficient and Transparent 
Previous References
 Executive Committee, 2 October 2024
 Executive Committee, 13 November 2024 
List of Background Papers
▪ Financial ledger to 4 October 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:
Graham Booth, Finance Manager (Strategy)
Ext:  2699 (Tel:  01698 452699)
E-mail:  graham.booth@southlanarkshire.gov.uk
26

Page 27

Appendix A 
South Lanarkshire Council
Capital Expenditure 2024-2025
Community and Enterprise Resources Programme
For Period 1 April 2024 – 4 October 2024
Education Resources Base Budget 
£000
Budget
Adjustments
£000
Slippage/
Acceleration
£000
Total
Budget
£000 
Forecast
Spend
£000 
Forecast
Variance
£000
Actual
Expenditure
£000 
Facilities, Waste and Grounds  2,846  252  -  3,098  3,098  3,098  663
Enterprise and Sustainable
Development
28,558 8,097 (9,385) 27,270 27,270 27,270 2,292
Roads, Transport and Fleet 19,170 4,150 (9) 23,311 23,311 23,311 6,238 
TOTAL 50,574 12,499  (9,394) 53,679 53,679 53,679 9,193   
For Information Only
Budget Adjustments approved by Executive Committee, 2 October 2024:  Budget Adjustments approved by Executive Committee, 13 November 2024: 
Budget Adjustments 
Hamilton Town Centre Masterplan
Electric Vehicle Expansion
Lesmahagow Salt Barn 
Total Budget Adjustments           
£0.100m 
(£0.040m) 
(£0.009m) 
£0.051m
Budget Adjustments 
McKirdy Park
Larkhall Leisure Centre
Place Based Investment Funding 2024/25                  
City Deal – Secondary Schools
Leisure and Culture Transformation Fund                       
Total Budget Adjustments   
£0.252m
(£1.027m)
£0.589m
(£3.458m)
(£4.900m) 
(£8.544m) 
27

Page 28

28

Page 29

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Finance and Corporate Resources)
Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resources – Workforce
Monitoring – July to September 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide employment information for July to September 2024 relating to
Community and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the following employment information for July to September 2024 relating
to Community and Enterprise Resources be noted:- 
 attendance statistics
 occupational health
 accident/incident statistics
 discipline, grievance and Dignity at Work cases
 analysis of leavers and exit interviews
 Staffing Watch as at 14 September 2024 
[1recs]
3. Background
3.1. As part of the Council’s performance management arrangements, regular workforce
monitoring reports are submitted to Committee.  This report for Community and
Enterprise Resources provides information on the position for July to September
2024. 
4. Monitoring Statistics
4.1. Attendance Statistics (Appendix 1) 
Information on absence statistics is analysed for the month of September 2024 for
Community and Enterprise Resources. 
The Resource absence figure for September 2024 was 6.9%, this figure has
increased by 1.2% when compared to the previous month and is 0.8% higher than
the Council-wide figure.  Compared to September 2023, the Resource absence
figure has increased by 0.5%.
5
29

Page 30

Based on the absence figures at September 2024 and annual trends, the projected
annual average absence for the Resource for 2024/2025 is 6.4%, compared to a
Council-wide average figure of 5.6%. 
Managers follow the procedures outlined in the Maximising Attendance Policy to
support employees to remain at work, or to return to work after a sickness absence. 
There are comprehensive employee supports in place and additionally, Personnel
Services work in close partnership with line managers and Resource Management
Teams on a case management basis to ensure that appropriate actions are taken. 
4.2. Occupational Health (Appendix 2) 
In terms of referrals to occupational health, 254 referrals were made this period. 
This represents a decrease of 104 when compared with the same period last year. 
4.3. Accident/Incident Statistics (Appendix 2) 
There were 45 accidents/incidents recorded within the Resource this period. Due to
a changeover in systems, data input has been delayed, therefore comparisons to
last year is not possible. 
4.4. Discipline, Grievance and Dignity at Work (Appendix 2) 
During the period, 16 disciplinary hearings were held within the Resource, a
decrease of 5 when compared to the same period last year.  Two internal Resource
appeals were raised, both of which were not upheld; an increase of 2 when
compared to the same period last year.  During the period no appeals were heard by
the Appeals Panel and no Appeals Panels were pending.  Two grievances were
raised within the Resource, this figure has increased by 2 when compared to the
same period last year.  Six Dignity at Work complaints were raised within the
Resource, this figure has increased by 6 when compared to the same period last
year. 
4.5. Analysis of Leavers (Appendix 2a) 
There were a total of 68 leavers this period eligible for an exit interview. This figure
has increased by 11, when compared with the same period last year.  Given the
transition to the new Fusion system, exit interview data continues to be collated and
updated for this period. 
5. Staffing Watch 
5.1. There has been an increase of 266 employees in post from 11 June 2024 to 14
September 2024. 
6. Employee Implications
6.1. There are no implications for employees arising from the information presented in
this report. 
7. Financial Implications
7.1. All financial implications are accommodated within existing budgets. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change, sustainability and environmental Implications in terms
of the information contained within this report.
30

Page 31

9. Other Implications
9.1. There are no implications for sustainability or risk in terms of the information
contained within this report. 
10. Integrated Impact Assessment and Consultation Requirements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
10.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 Fair, open and sustainable
 Ambitious, self aware and improving
 Excellent employer
 Focused on people and their needs
 Working with and respecting others 
Previous References
 Community and Enterprise Resources – 17 September 2024 
List of Background Papers
 Monitoring information provided by Finance and Corporate Resources 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Elaine Maxwell, HR Business Manager
Ext:  (Tel: 01698 454647)
E-mail:  Elaine.Maxwell@southlanarkshire.gov.uk 
31

Page 32

2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
2022 /
2023
2023 /
2024
2024 /
2025
% % % % % % % % % % % %
April 4.4 3.6 3.2 April 7.3 6.3 6.8 April 6.9 6.0 6.3 April 5.6 5.1 5.2
May 3.9 3.7 3.1 May 6.8 6.3 6.3 May 6.3 5.9 5.9 May 5.4 5.1 5.3
June 3.5 4.3 4.1 June 7.2 5.9 6.4 June 6.7 5.7 6.0 June 5.3 4.7 5.2
July 3.9 2.3 3.8 July 5.9 4.6 4.5 July 5.6 4.3 4.4 July 4.6 3.8 4.1
August 3.4 3.0 3.4 August 6.6 5.2 6.2 August 6.1 4.9 5.7 August 4.4 4.1 4.7
September 3.1 2.5 3.8 September 7.9 7.1 7.5 September 7.1 6.4 6.9 September 5.4 5.3 6.1
October 5.1 2.0 October 7.5 7.0 October 7.1 6.3 October 5.8 5.1
November 4.2 2.6 November 8.3 8.1 November 7.7 7.3 November 6.5 6.2
December 3.7 3.0 December 8.8 7.5 December 8.0 6.8 December 7.0 6.6
January 2.6 3.6 January 7.4 7.4 January 6.7 6.9 January 5.8 6.1
February 3.6 4.0 February 7.4 7.8 February 6.9 7.2 February 5.9 6.4
March 3.9 3.2 March 7.9 7.9 March 7.3 7.2 March 6.4 6.3
Annual Average 3.8 3.2 3.3 Annual Average 7.4 6.8 7.0 Annual Average 6.9 6.2 6.4 Annual Average 5.7 5.4 5.6
Average Apr-Sep 3.7 3.2 3.6 Average Apr-Sep 7.0 5.9 6.3 Average Apr-Sep 6.5 5.5 5.9 Average Apr-Sep 5.1 4.7 5.1
585 2876 3461 15851
Appendix 1
Absence Trends - 2022/2023, 2023/2024 & 2024/2025
Community and Enterprise Resources
APT&C Council WideManual Workers Resource Total
No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024 No of Employees at 30 September 2024
32

Page 33

Jul - Sep Jul - Sep
2023 2024
MEDICAL EXAMINATIONS
Number of Employees Attending
EMPLOYEE COUNSELLING SERVICE
Total Number of Referrals
PHYSIOTHERAPY SERVICE
Total Number of Referrals
REFERRALS TO EMPLOYEE SUPPORT OFFICER 96 58
REFERRALS TO COGNITIVE BEHAVIOUR
THERAPY 0 1
TOTAL 358 254
Jul - Sep Jul - Sep
2023 2024
Specified Injuries* 0 2
Over 7 day absences 7 9
Over 3 day absences** 0 1
Minor 23 23
Near Miss *** 4 3
Violent Incident:  Physical**** 15 5
Violent Incident:  Verbal***** 4 2
Total Accidents/Incidents 53 45
Jul - Sep Jul - Sep
2023 2024
Total Number of Hearings 21 16
Total Number of Appeals 0 2
Appeals Pending 0 0
Time Taken to Convene Hearing October - Jul to Sep 2024
0-3 Weeks 4-6 Weeks Over 6 Weeks
1 8 7
Jul - Sep Jul - Sep
2023 2024
Number of Grievances 0 2
Number Resolved at Stage 1 0 0
Number Resolved at Stage 2 0 1
Number Resolved at Stage 3 0 0
Still in Progress 0 1
Jul - Sep Jul - Sep
2023 2024
Number of Incidents 0 6
Number Resolved at Informal Stage 0 0
Number Resolved at Formal Stage 0 0
Number of Appeals 0 0
Appeals in Process 0 0
Still in Process 0 6
RECORD OF DIGNITY AT WORK
152 125
CAUSE OF ACCIDENTS/INCIDENTS
*A Specified Injury is any fracture (other than to the fingers, thumbs or toes), amputation, loss of sight,
serious burns, crushing injury, scalping, loss of consciousness caused by asphyxiation/ head injury, a
chemical or hot metal burn to the eye or penetrating injury as defined by the HSE.
**Over 3 day / over 7day absence is an injury sustained outwith specified injury category that results in a
period of absence of absence as defined by the HSE. 
***Near Miss - Any unexpected, unplanned occurrence (except Dangerous Occurrences) that does not
lead to injury of persons, damage to property, plant or equipment but may have done so in different
****Physical violent incidents are included in the "Specified" figures, where applicable, to provide the
****Physical violent incidents and ***** Verbal Violent Incidents are included in the "Over 3-day or Over 7-
day" figures, where applicable, to provide the "Total Over 3-day or Over 7-day" figures.
****Physical Violent Incidents and ***** Verbal Violent Incidents are included in the "Minor" figures, where
applicable, to provide the "Total Minor" figures.
RECORD OF DISCIPLINARY HEARINGS
RECORD OF GRIEVANCE HEARINGS
17 0
Appendix 2
COMMUNITY AND ENTERPRISE RESOURCES
93 70
33

Page 34

Jul - Sep Jul - Sep
2023 2024
Career Advancement 3 1
Child Caring / Caring Responsibilities 2 0
Disatisfaction with terms and conditions 1 0
Further Education 0 0
Moving outwith area 0 0
Personal Reasons 2 0
Poor relationship with managers / colleagues 2 0
Travelling difficulties 0 0
Other 7 1
Number of Exit Interviews conducted 17 2
Total Number of Leavers Eligible for Exit Interview 57 68
Percentage of interviews conducted 30% 3%
ANALYSIS OF REASONS FOR LEAVING
Appendix 2a
COMMUNITY AND ENTERPRISE RESOURCES
34

Page 35

As at 14 September 2024
Total Number of Employees
F/T P/T F/T P/T
1244 384 235 1576
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1711.95 415.46 269.47 48.94 18.30 0.00 2.00 0.00 2471.12
As at 11 June 2024
Total Number of Employees
F/T P/T F/T P/T
1237 275 233 1428
Chief Officer Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Fixed SCP Teacher TOTAL
5.00 1531.38 382.28 258.25 46.55 16.70 0.00 5.00 0.00 2245.16
Appendix 3
JOINT STAFFING WATCH RETURN
COMMUNITY AND ENTERPRISE RESOURCES
*Full - Time Equivalent No of Employees
Salary Bands
3439
MALE FEMALE TOTAL
*Full - Time Equivalent No of Employees
Salary Bands
MALE FEMALE TOTAL
3173
35

Page 36

36

Page 37

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community and Enterprise Resource Plan: Quarter 2
Progress Report 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide the Community and Enterprise Resource Plan Quarter 2 Progress
Report 2023/2024, for the period 1 April 2024 to 30 September 2024
[1purpose]
2. Recommendations
2.1. The Community and Enterprise Resources Committee is asked to approve the
following recommendation(s):-
[
(1) that the Community and Enterprise Resource Plan Quarter 2 Progress Report
2024/2025, as summarised in paragraph 5.2. and attached as Appendix 2 of
this report, be noted;
(2) that the key achievements made by the Resource to date, as detailed in
paragraph 5.3. of this report, be noted;
(3) that the areas for improvement and associated management actions, as
detailed in paragraph 5.4. of this report, be noted; and
(4) that the additional scrutiny of reporting the updated status of those measures
identified as ‘report later’ at Quarter 4 2023/2024, are summarised in
paragraph 5.6. of this report, be noted. 
3. Background
3.1. The Community and Enterprise Resource Plan 2024/2025 was approved by
Community and Enterprise Committee on 18 June 2024 and noted by the Executive
Committee on 26 June 2024 and sets out the outcomes, measures and actions to be
managed and delivered by the Resource for the financial year 2024/2025. 
3.2. The Resource Plan follows the agreed corporate structure and style. The Plan is a
key element of the Council’s performance management arrangements and provides
details of the context within which the Resource operates and establishes actions
and measures for the year ahead based on the Outcomes set out in the Council Plan
Connect 2022 to 2027.  
4. Resource Outcomes 2024/2025
4.1. The Resource has established a number of outcomes to support the delivery of the
Connect Outcomes in 2024/2025. These are detailed at Appendix 1.
6
37

Page 38

5. Quarter 2 Progress Report 2024/2025
5.1. Progress against all Resource Plan measures is contained in the Quarter 2 Progress
Report 2024/2025, attached as Appendix 2.  This report has been produced from the
Council’s performance management reporting system IMPROVe, and uses a traffic
light format with the following definitions to give a status report on each measure:  
Status Definition
Blue Project complete
Green The timescale or target has been met as per expectations
Amber There has been minor slippage against timescale or minor shortfall
against target
Red There has been major slippage against timescale or major shortfall
against target
Report
later
The information is not yet available to allow us to say whether the
target has been reached or not.  This will be reported when available
Contextual Included for ‘information only’, to set performance information in context 
5.2. To ensure adequate scrutiny of performance across all Resources, the Council’s
Performance and Review Scrutiny Forum may consider ‘red’ and/or ‘amber’
measures at a future meeting.  There are no red measures to detail in this report. 
The overall summary of progress to date is set out in the table below: 
Status Measures
Statistical Project Total %
Blue 0 2 2 3.6
Green  14 29 43 76.8
Amber  5 3 8 14.3
Red     0 0 0 0
Report later/Contextual 2 1 3 5.3
Totals  21 35 56 100%   
(Data correct as at 24-10-2024)  
5.3. Key achievements for 2024/2025, to date, are noted below:  
Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
Communities are
encouraged and
supported to
reduce, re-use and
recycle their waste 
The percentage of household waste sent to landfill in the
period January to June 2024 was 1%, remaining well
below the 5% target. (NB this measure is reported per
calendar year)
Communities are
well connected
The percentage of properties with Full Fibre Connection
has increased to 50.6%, exceeding the annual target of
43%
38

Page 39

Connect Outcome  Communities and Environment 
Resource
Outcome
Achievement
All schools and
nursery children
have access to
nutritious school
meals
Primary school meal uptake for the period April to
September was 70%, exceeding target (66%). The new
menu started on 26 August 2024.
All roads, footways,
cycle routes,
bridges and
associated
infrastructure are
safe and fit for
purpose
Across our capital programme, 92 road safety schemes (71
carriageway and 21 footway) are to be delivered during
2024-25 and at the end of quarter two, 44 schemes have
been delivered (34 carriageway/10 footway). This
demonstrates good progress to date and the programme
will remain under review.  
A programme of bridge and other structure projects have
continued to be implemented, including the £9.4m
replacement of the Clyde Bridge which was completed in
quarter one. 
Road and
transportation
infrastructure
supports new
development,
enables use of
public transport and
encourages active
travel
Stewartfield Way/ East Kilbride Town Centre Enhancement
- a report was presented to Community and Enterprise
Committee during April 2024 outlining the revised project.
Updated traffic modelling has been completed and
approval for the project's wider aims was obtained by the
Glasgow City Region Chief Executives' Group in June
2024. 
City Region Cabinet also approved the scope of the project
change control on 6 August 2024. This will allow individual
Outline Business Cases (OBCs) for Stewartfield Way and
Town Centre proposals. The OBC for the Stewartfield Way
part of the project has been submitted to the Programme
Management Office (PMO) for initial consideration and
thereafter, Cabinet approval on 5 November 2024.  A
report to the Council’s Executive Committee is also being
scheduled for 13 November 2024. 
High-quality streets,
parks and other
public areas
ensures South
Lanarkshire is a
place where people
want to live, work,
visit and invest
Green Flag accreditation award was retained for
Cambuslang Park, Strathaven Park and Castlebank Park. 
39

Page 40

Connect Outcome  Health and Wellbeing
Resource
Outcome
Achievement
All residents have
the opportunity to
access cultural,
leisure and outdoor
recreational
activities to help
improve their
wellbeing and
quality of life
The Council has appointed a consultant to undertake an
independent objective review of Council properties,
including those operated by SLLC. At the same time, the
£13m Transition Fund is helping to modernise the leisure
and culture asset base. Phase 1 of the Transition Fund
(£8.5m) spend is underway with properties already
identified. Properties are currently being identified for
Phase 2 (£4.5m).
Public health is
safeguarded
through an effective
environmental
regulation and
enforcement
service.
Formal grant funding from Strathclyde Partnership for
Transport (SPT) to support active travel behaviour change
initiatives has been confirmed and a grant of £195,500 has
been awarded to fund a further Beat the Street project as
well as continuing with the BetterPoints Think, Move,
Breathe project until March 2025. This brings the total
awarded in 2024/25 (to end of September 2024) from
Scottish Government air quality grant and SPT to
£391,914.05. 
Scottish Government funding is being used to support air
quality monitoring activities as well as for active travel
promotional campaigns, anti-idling campaigns, and Eco
Stars support for businesses that operate fleet which travel
through the South Lanarkshire area. 
Connect Outcome  Our Economy
Resource
Outcome
Achievement
A people-centred
approach to
recovery is
implemented to help
individuals,
communities,
businesses and the
social and third
sector thrive
To date, 1,340 participants have been supported on
council-operated employability programmes, well on the
way to reaching the 1,500 target. 
To date, 355 participants have moved into further/higher
education or other formal training programmes following
employability support, just shy of the target (400).
Thriving town and
neighbourhood
centres provide a
focal point for local
communities
Following completion and approval of the masterplan, a
delivery structure and programme of activity will be
finalised. Officers have considered the broad principles of
how each element can be delivered and an appropriate
funding model. Key projects are: 
 Newcross Centre – closure and redevelopment of the
centre. 
 Regent Centre Sale and partnership agreement - sale
and redevelopment of existing centre which is at the
end of its useful life. 
40

Page 41

Connect Outcome  Our Economy
Resource
Outcome
Achievement
 Bairds redevelopment – consider options for
redevelopment 
 Town Square repurposing – refresh this vital public
space for the future 
 Vogue redevelopment – consider options for
redevelopment. 
5.4. In addition to working towards these Outcomes, it is recognised that the Council will
continually aim to improve and ensure effective and efficient use of resources, and
that business will be conducted with integrity and transparency and will operate to
the highest standards.  In order to monitor and report progress against these values,
Resource outcomes have also been identified under the heading Delivering the Plan
and achieving Best Value. 
Delivering the Plan and achieving Best Value
Resource
Objective
Achievement 
Customers
experience high
quality and
improving council
services
Bereavement Services achieved 95% customer satisfaction
remaining at a high level. 
Customer satisfaction with cleaning and catering services
has exceeded target, achieving 99% satisfaction rate. 
The workforce has
the skills, flexibility
and capacity to
deliver the
Council’s priorities
The initial implementation of the Competence Assessment
System (CAS) toolkit for Building Standards officers has
been completed. The Building Standards Division (BSD)
now intends that the next stage will be the development of
an online tool to identify skills gaps. It is anticipated that this
will be an independent assessment by a third-party
organisation and will be introduced in 2026. In the
meantime, training needs of staff continue to be monitored
with a view to facilitating training in order to ensure that the
required levels of staff competency can be met by the
assessment date. 
5.5. Areas for improvement
No measures have been classified as ‘red’ (major slippage against timescale or
shortfall against target) at quarter two.
41

Page 42

5.6. Report later
Measures in the quarterly progress reports which are not blue, red, amber or green
can be assigned a status of ‘report later’ or ‘contextual’. A further analysis introduced
to aid scrutiny of performance, is to follow up the measures in these categories from
the Quarter 4 2023/2024 report. There was one measure identified in these
categories at Quarter 4 last year, it is a Local Government Benchmarking Framework
(LGBF) indicator, for which the 2023/2024 results will not be published until February
2025. 
6. Employee Implications
6.1. The outcomes noted within the Resource Plan will inform the Service Action Plans,
where applicable, and in turn the Performance Appraisal process for individual
employees. 
7. Financial Implications
7.1. The outcomes within the Resource Plan are reflected in the respective annual
Resource Revenue and Capital budgets and, longer term, within the framework of
the Council’s approved Financial Strategy. 
8. Climate Change, Sustainability and Environmental Implications
8.1. There are no climate change or environmental implications as a result of this report. 
8.2. The Council acknowledges the serious and immediate threat of climate change and
is committed to accelerating the pace of action in response to the climate emergency
and in Scotland’s transition to a net-zero and climate resilient society and economy.
All Resource Plans have recognised sustainable development and climate change
as a key area of focus for 2024/2025. 
9.  Other Implications
9.1. A significant element of the delivery of the outcomes in the Community Plan 2022 to
2032 will come through the achievement of the actions contained within Connect. 
9.2. Resource Plan actions are assessed as part of the Resource’s risk management
arrangements and relevant issues have been added to the Resource Risk Register. 
10. Equality Impact Assessment and Consultation Arrangements
10.1. Many of the actions detailed within the Resource Plan reflect ongoing strategies and
policies which will be or have been the subject of consultation and equality impact
assessment. 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
42

Page 43

Link(s) to Council Values/Priorities/Outcomes
 The Resource Plan has been structured upon the Vision, Values and Outcomes in the
Council Plan Connect 2022-2027 
Previous References
 Council Plan Connect 2022-2027 – approved by the full Council on 15 June 2022
 Community and Enterprise Resource Plan 2024/2025 – approved by Community and
Enterprise Resources Committee on 18 June 2024 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Anne Lewis (Performance and Development Officer)
E-mail:  anne.lewis@southlanarkshire.gov.uk
43

Page 44

Appendix 1 
Community and Enterprise Resource Outcomes 2024/2025 
Connect
Outcomes Resource Outcomes  
Communities and
Environment 
• High-quality streets, parks and other public areas ensures South
Lanarkshire is a place where people want to live, work, visit and invest
• Communities are encouraged and supported to reduce, re-use and
recycle their waste
• The council addresses climate change by reducing carbon emissions,
protecting our natural environment, adapting to the impacts of climate
change, and acting sustainably
• Communities are well connected 
• All roads, footways, cycle routes, bridges and associated infrastructure
are safe and fit for purpose
• Road and transportation infrastructure supports new development,
enables use of public transport and encourages active travel
• The 20-minute neighbourhood principle is established in our
communities to make our places more sustainable and liveable.
Education and
Learning 
• No resource outcomes for this Connect outcome 
Health and
Wellbeing 
• Public health is safeguarded through an effective environmental
regulation and enforcement service
• All school and nursery children have access to nutritious school meals 
• Health inequalities are addressed through collaboration with local
communities and partners
• All residents have the opportunity to access cultural, leisure and
outdoor recreational activities to help improve their wellbeing and
quality of life
Children and
Young People 
• No resource outcomes for this Connect outcome 
Housing and
Land 
• Vacant, derelict and contaminated land is brought back into productive
use
• Appropriate supply of housing land (including affordable housing) is
maintained
Our Economy  • South Lanarkshire is an attractive place to start, grow and locate a
business
• Economic development and growth in South Lanarkshire is fair,
inclusive, sustainable and low carbon
• Thriving town and neighbourhood centres provide a focal point for local
communities 
• Physical development and land use in the area is enabled, guided and
controlled to help facilitate economic growth  
• Consumers and communities are protected through an effective trading
standards service 
• A people-centred approach to recovery is implemented to help
individuals, communities, businesses and the social and third sector
thrive 
44

Page 45

Connect
Outcomes Resource Outcomes  
Delivering the
Plan and
achieving Best
Value
• The council demonstrates high standards of governance and sound
financial stewardship
• Customers experience high standards of governance and sound
financial stewardship
• The workforce has the skills, flexibility and capacity to deliver the
council’s outcomes
• Digital and ICT services meet the needs of the council and its
customers 
45

Page 46

46

Page 47

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 28 Oct 18:52
Quarter 2 : April 2024 - September 2024
South Lanarkshire Council
Community and Enterprise
Resource Plan
(This represents the cumulative position to September 2024)
Performance Report 2024-25
6
47

Page 48

IMPROVe - SLC Performance Management System                                                                                                                  Report printed on 28 Oct 18:52
Summary - number of measures green, amber and red under each Council Plan Outcome /
Theme
Council Outcome/ Theme Green Amber Red Report later /
Contextual
Total
Communities and Environment 5 3 0 1 9
Education and Learning 0 0 0 0 0
Health and Wellbeing 3 0 0 0 3
Children and Young People 0 0 0 0 0
Housing and Land 0 0 0 0 0
Our Economy 6 2 0 1 9
Delivering the plan and achieving best value 0 0 0 0 0
Total 14 5 0 2 21
Page 1
48

Page 49

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of streets found to be
acceptable during Litter Monitoring
Systems Surveys
Surveys are undertaken three times per year. The figure to date reflects
the results from the first survey only.
With two more surveys to be undertaken over the year, there is still
potential that the target at year end will be met.
Amber 92.00% 89.40% 92.10% 92.30% 92.00%
Land Audit Management System grounds
maintenance score
With a year to date figure of 72.0, the service is on course to achieve
annual target (72.0).
Green 72.0 72.0 71.3 72.0 72.0
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of total household waste that is
recycled in 2024
This measure is reported per calendar year, so the calendar year to date
figure for January to June 2024 is 42.94% and is lower than the annual
target of 50%.
However, it is noted that the figure rose to 46.97% during the period
from April to June 2024.
The inability to recycle Waste Upholstered Domestic Seating (WUDS)
means that this type of waste goes to landfill, and is affecting the
percentage of total household waste that is recycled. However, it is not
possible to measure exactly what the impact is as the specific amount of
WUDS going to landfill is not recorded. The percentage of total
household waste that is recycled will continue to be monitored.
Amber 50.00% 42.94% 41.50% 41.20% 43.75%
Page 2
49

Page 50

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
Communities are encouraged and supported to reduce, re-use and recycle their waste
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of household waste sent to
landfill in 2024
This measure is reported per calendar year and the latest figures relate
to quarter two, from April to June 2024 (1.64%). While this figure
remains well below the target to stay under 5%, a planned waste outage
tonnage was evident in May/June 2024, meaning that the Energy from
Waste facility in Dunbar was closed for planned maintenance and a
relatively small amount of waste was therefore diverted to landfill.
The year to date figure is 1% and remains significantly lower than the
annual target of 5%.
Green 5.00% 1.00% 8.66% 1.84% 1.50%
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change, and actingsustainably
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Reduction in the Council carbon emissions
in 2023/24 compared to 2022/23 (previous
year)
The carbon emissions are reported a year behind, so we are currently
reporting on 2023/24 figures and note that the Council’s carbon
emissions reduced by 9.46% in comparison with 2022/23.
The target is to continue to reduce the Council's carbon emissions and
there is therefore no figure to enter as a target for this measure.
Green ------ ------ ------ ------ 9.5%
Communities are well connected
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of properties with Superfast
Broadband >30Mbps
Coverage has increased by 0.2% during quarter two, July to September
2024 compared to quarter one.
Green 99.0% 98.5% 97.0% 97.3% 97.9%
Percentage of properties with Full Fibre
Connection
There has been an increase during July to September 2024 of just
under 2.4%, compared to quarter one, in the percentage of properties
with Full Fibre Connection. This brings the year to date figure to 50.6%
exceeding the annual target.
Green 43.0% 50.6% 21.9% 32.6% 45.4%
Page 3
50

Page 51

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways and bridges and associated infrastructure are safe and fit for purpose
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Percentage of our road network that should
be considered for maintenance treatment
(Roads Condition Index).
This figure is derived from the Scottish Collaboration of Transportation
Specialists (SCOTS) Road Condition Index (RCI) survey which is
undertaken each year. The 2023-25 figures will be reported later in the
year.
The target figure of 31.9% is based on the results for the period
2022-24, a significant regression compared to the previous year.
Report Later 31.9% ------ 29.7% 30.8% 31.9%
Number of road casualties in South
Lanarkshire during 2024.
Provisional casualty figures are available for first seven calendar months
of 2024, when there were 211 casualties. Of these, there was 1 fatal
casualty, 79 serious casualties and 131 slight casualties. There were 0
child fatal casualties, 5 children seriously injured and 23 children slightly
injured.
These can be compared with the same period in 2023, when there were
220 casualties. Of these, there were 4 fatalities, 69 serious casualties
and 147 slight casualties. For children in 2023, there were 0 child fatal
casualties, 11 children seriously injured and 15 children slightly injured.
It should be noted that traffic volumes have now returned closer to
pre-Covid levels which is reflected in the casualties numbers.
Amber 370 211 254 284 370
Page 4
51

Page 52

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
Public health is safeguarded through an effective environmental regulation and enforcement service
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Broad compliance with food law statutory
requirements secured in premises
Year to date 95% of food businesses (2,763) that have been inspected
were found to be broadly compliant with both food hygiene and food
standards legislation. This compliance figure continues to exceed the
annual target set for this measure.
Since the new food law rating scheme came into affect, local authorities
can focus resources on high risk and non-compliant businesses by
conducting more frequent inspections in these establishments.
Green 85.0% 95.0% 93.0% 96.0% 95.0%
All schools and nursery children have access to nutritious school meals
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Level of primary school meal uptake (as a
proportion of total primary school meals
which could be taken up over the period)
The level of school meal uptake is in line with target. The new menu
started on 26 August 2024.
Green 66.0% 70.0% 58.2% 66.0% 69.2%
Level of secondary school meal uptake (as
a proportion of total primary school meals
which could be taken up over the period)
The level of secondary school meal uptake is on course to meet the
annual target.
Green 38.0% 37.0% 36.3% 38.0% 39.9%
Page 5
52

Page 53

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of new South Lanarkshire
business starts supported by Business
Gateway
This year represents a transition for the Business Gateway, changing
from a contract based external provider model, to an in house model
which will reflect a more customer focused, rather than target driven,
delivery model.
This first year target and performance reflects the two months of
transition when there was a physical move and then employee training.
The target has been adjusted to reflect expectations over a 10 month
period.
Amber 500 99 ------ 520 499
Number of business support interventions
per annum by Economic Development
(grants, loans or advice)
This year represents a transition for the Business Gateway changing
from a contract based, external provider model to an in house model.
Since this change a decision was made that all referrals for business
advice be referred directly to the Business Gateway and from now on
they will be the public facing organisation for business support in South
Lanarkshire.
The previous model was target driven around the number of business
engagements which diluted the effectiveness of service delivery.
Through a revised customer focused service approach appropriate
target levels will be established through this first year of altered service
delivery.
Amber 800 298 2,679 1,615 829
Page 6
53

Page 54

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of jobs created or sustained per
annum as a direct result of Economic
Development intervention
Business Gateway remain on track to reach the target for the current
year.
The figures for 2021/22 and 2022/23 reflect the particularly high volume
of engagement with businesses, seeking to invest in business recovery
and growth following the effect of Covid. Going into 2023/24 there
remained legacy grants that went on to be processed during 2023/24
resulting in a higher number of jobs being created or sustained.
The 2024/25 target and performance figures reflect the expected
number of engagements in more stable economic conditions.
Green 500 297 1,095 1,256 646
Increased value of sales generated by
businesses as a direct result of Economic
Development intervention
The figures for 2021/22 and 2022/23 reflect the particularly high volume
of engagement with businesses, seeking to invest in business recovery
and growth following the effect of Covid. Going into 2023/24 there
remained legacy grants that went on to be processed during 2023/24
resulting in a higher value for that financial year.
The 2024/25 target and performance figures reflect the expected
number of engagements in more stable economic conditions. During
April to September 2024 there were two grants being delivered;
Business Growth Grant and the Micro Business Grant and as a result
the annual target has been exceeded. The total value of sales as a
result of these grants is £8.751m.
Green £5.000m £8.751m £22.107m £13.113m £14.496m
Perecentage of procurement spend on
local enterprises
This is a local government benchmarking framework (LGBF) indicator.
The figure for 2023/24 will be reported as part of the LGBF framework in
early 2025.
Report Later ------ ------ 18 18 ------
Page 7
54

Page 55

IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                   Report printed on Monday 28 October 2024
Resource Plan Performance Indicators South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Delivery of UK Shared Prosperity
Programme
Delivery is progressing across the full programme and is expected to
meet the target.
The annual report will be presented to the Community and Enterprise
Committee on 26 November 2024.
Green £6.000m £2.076m £0.000m £0.000m £3.489m
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrive
Performance Indicators Comments/ Progress Status 2022/23 2023/242021/22Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of participants supported via
council-operated employability
programmes
To date 1340 participants have been supported on employability
programmes.
Green 1,500 1,340 1,934 1,687 2,663
Number of participants gaining sustainable
employment
To date 325 participants have moved into employment following
employability support.  This includes Modern Apprenticeships, full/part
time employment.
Green 700 325 1,146 584 643
Number of participants accessing further
education or training
To date 355 participants have moved into further/higher education or
other formal training programmes following employability support.
Green 400 355 219 536 870
Page 8
55

Page 56

Summary - number of measures complete, green, amber and red under each Council Plan
Outcome / Theme
Council Outcome/ Theme Complete Green Amber Red Report later Total
Communities and Environment 0 13 2 0 0 15
Education and Learning 0 0 0 0 0 0
Health and Wellbeing 0 4 0 0 1 5
Children and Young People 0 0 0 0 0 0
Housing and Land 0 1 0 0 0 1
Our Economy 2 11 1 0 0 14
Delivering the plan and achieving best value 0 0 0 0 0 0
Total 2 29 3 0 1 35
Page 9
56

Page 57

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
High-quality streets, parks and other public areas ensures South Lanarkshire is a place where people want to live, work, visit and invest
Action Measures Comments/ Progress Status
Prepare an Open Space
Strategy in partnership
with Glasgow and Clyde
Valley Green Network
Partnership and other
council services
Engagement on the findings following analysis of the Open
Space audit will be carried out during quarter two and will in
turn be used to inform the evidence report for the Local
Development Plan 3. It is anticipated that a draft Open
Space Strategy will be available early 2025 once the
Gatecheck of the Evidence Report has been completed.
Engagement on the Council's Open Space Strategy and Play
Sufficiency Assessment will be carried in quarter three of 2024/25. It is
anticipated that a draft Open Space Strategy will be reported to the
Planning Committee in September 2025, slightly later than first
indicated.
Amber
To make South
Lanarkshire a cleaner
place to live, work and
visit free of litter, fly
tipping and dog waste
Prepare an annual progress report for Climate Change and
Sustainability Committee in September 2024, demonstrating
the impact of the Litter Strategy (2022-2027)
The annual report on progress with the Litter Strategy and Action Plan
is currently being drafted and will be circulated to the Steering Group
before being presented to the Climate Change and Sustainability
Committee on the 18 December 2024.
Green
Communities are encouraged and supported to reduce, re-use and recycle their waste
Action Measures Comments/ Progress Status
Support a circular
economy by re-using,
recycling and generating
energy from the waste
we manage
Complete the review of waste services taking into
consideration that the Deposit Return Scheme (DRS) has
been postponed until October 2027 and the outcome of the
Circular Economy Bill consultation
The review of Waste Services is ongoing and key workstreams have
been completed in line with timescales and reported to CMT.  Approval
for proposals relating to the introduction of garden waste charges and
Waste Upholstered Domestic Seating (WUDS) collections have now
been approved by Executive Committee and Community and
Enterprise Committee, respectively.
The review of Household Waste Recycling Centres (HWRC) and the
award of the contract for the management and operation of HWRCs
were completed on time.  The Service is now working on finalising
aspects of the kerbside collection workstream which will be presented
to CMT after the summer recess.
Green
Page 10
57

Page 58

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,and acting sustainably
Action Measures Comments/ Progress Status
Lead by example and
influence area-wide
climate change and
sustainability action
Implement the Sustainable Development and Climate
change Strategy (2022-2027) Action Plan, and report
progress at quarter two and quarter four to Climate Change
and Sustainability Committee
Implementation of the Sustainable Development and Climate Change
(SDCC) Strategy and Action Plans is progressing in line with agreed
timescales. The quarter four update for the 2023/24 Action Plan was
presented to the Climate Change and Sustainability (CCS) Committee
in August 2024. The Action Plan for 2024/25 was also approved at this
Committee meeting. The quarter two update for the 2024/25 Action
Plan is expected to be presented to CCS Committee in December
2024.
Green
Ensure national
planning policy set out in
National Planning
Framework 4 in relation
to climate change,
biodiversity and
sustainable travel is
embedded in decision
making process for
planning applications
and the preparation of
the South Lanarkshire
Local Development Plan
3
Awareness sessions to be developed for elected members,
planning officers and developers/agents by September 2024
Officer workshops and members’ awareness sessions were held in
spring 2024. However, awareness sessions with developers and
agents have not taken place. The Scottish Government have advised
that guidance on implementing the Climate Change policy position in
the National Planning Framework 4 (NPF4) is being prepared and it is
therefore appropriate to postpone the awareness raising until the
national policy direction is clearer.
In the meantime, non-statutory planning guidance on the Nature topic
is being developed by the Planning Service and it is intended to report
this to Planning Committee in 2024/25 after which it will be published
on the Council’s website and used in the decision making process for
planning applications.
Green
Page 11
58

Page 59

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
The council addresses climate change by reducing carbon emissions, protecting our natural environment, adapting to the impacts of climate change,and acting sustainably
Action Measures Comments/ Progress Status
Create the conditions for
the decarbonisation of
the council's fleet
Implement and review the Fleet Strategy (2020-2025) Action
Plan including reducing transport related emissions, through
converting the fossil fuelled small fleet to full electric and
trialling new fuel options for the medium to heavy fleet as
such opportunities become commercially viable
An update to the Fleet Asset Management Plan is now underway. It is
recognised that the two years lost to the Covid-19 pandemic impacted
the extent of progress that might have otherwise been made. Recent
recruitment exercise has now provided some stability to focus on this
key piece of work.  A paper will be presented to a future Committee
most likely during 2025.
Green
Deliver new and
improved low carbon
vehicle charging
infrastructure
Maintain, manage and expand public infrastructure points /
hubs in line with available internal and external funding
sources
Work is continuing on the regional collaboration initiative to expand
and enhance vehicle charging infrastructure across the west. An Inter
Authority Agreement has been agreed.  Tenders are currently being
reviewed for the appointment of a consultant to prepare tender
documentation and project manage the next phase.  This will seek to
appoint a commercial operator for publicly available electric vehicle
charging infrastructure.
Green
Page 12
59

Page 60

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Deliver prioritised road
safey infrastructure
improvements and
promote road safety
Deliver road safety projects and schemes in line with agreed
2024-25 programme
Through the Annual Accident Investigation and Prevention (AIP)
project, funding from the Road Safety Improvement Fund will allow for
measures to be provided at the following locations:
•A70, from A73 Hyndford Rd to A743 Ravenstruther
•A706, Forth to council boundary
•Hillhouse Road/Technology Avenue, Hamilton
•A71 Ayr Road near Burnhead Road, Shawsburn
•A726, from Torrance Roundabout to Strathaven
Works instructions have been issued (with the exception of A726, from
Torrance Roundabout to Strathaven which will be issued imminently).
Works are programmed for completion by March 2025.
Green
Page 13
60

Page 61

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Prepare prioritised
programme of
carriageway and
footway maintenance
works
Deliver road safety projects and schemes in line with agreed
2024-25 programme
Across our capital programme we have identified 92 schemes (71
carriageway / 21 footway) to be delivered during 2024-25 and up until
the end of quarter two we have delivered 44 schemes (34
carriageway/10 footway) schemes.  This demonstrates good progress
to date and the programme will remain under review.
Green
Page 14
61

Page 62

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Prepare prioritised
programme of bridge
and structure
maintenance works
Deliver a programme of bridge and other structures projects
in line with agreed 2024-25 funding
Replacement of C29 Clyde Bridge – construction phase completed in
quarter one.
Emergency repair and strengthening of Burnhouse Bridge by
Auldhouse: contract awarded in quarter two and site operations
programmed to commence in quarter three.
East Kilbride line electrification – Maintenance and refurbishment of
four South Lanarkshire Council structures affected: tenders exercise
and contract award completed in quarter two with contract period
programmed for quarter four to align with Network Rail blockade of
line.
Structural appraisal of Duke Street multiple storey car park (MSCP):
appraisal to be completed over three separate phases. Phase 1
commission for Initial Appraisal and Condition Survey complete.
Phase 2 currently on hold awaiting advice from senior management.
Refurbishment and repair of Priestburn Bridge by Glassford: contract
awarded in quarter two and site operations programmed to commence
in quarter three.
Refurbishment and installation of high containment kerbing at A702
Elvanfoot Bridge: proposed scope of work and outline programme
confirmed in quarter one.  Tender documents to be prepared in quarter
two, issued in quarter three with award also programmed for quarter
three.  Construction period programmed for quarter four.
Green
Prepare prioritised
programme of traffic
signal and pedestrian/
cycle crossing
maintenance works
Deliver a programme of traffic signal and pedestrian / cycle
crossing upgrade projects in line with agreed 2024-25
funding
Progressing from 2023/24 works, a new pedestrian crossing facility will
be provided on Burnbank Road, Hamilton funded by Active Travel Tier
1 Funding. Design is 90% complete and works to be issued in the
coming weeks.
Four pedestrian crossings are being upgraded, funded from the Direct
Resource fund.
Green
Page 15
62

Page 63

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
All roads, footways, cycle routes, bridges and associated infrastructure are safe and fit for purpose
Action Measures Comments/ Progress Status
Works at the following locations are programmed to be complete by
March 2025:
•High Common Road, East Kilbride
•Cadzow Street at Lower Auchingramont Road, Hamilton
•Portland Place, Hamilton
•Main Street, High Blantyre
Deliver winter
maintenance
carriageway and
footway gritting actions
during inclement
weather
During adverse weather, undertake appropriate
precautionary actions and during severe weather ensure
main, secondary and extreme routes are treated as
necessary.
All plans in place to ensure that precautionary, secondary and extreme
routes are treated as necessary throughout winter.
Green
Page 16
63

Page 64

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Communities and Environment
Road and transportation infrastructure supports new development, enables use of public transport and encourages active travel
Action Measures Comments/ Progress Status
Produce a new Local
Transport Strategy for
South Lanarkshire
Draft Local Transport Strategy will be presented to
Committee in Autumn 2024
An initial draft structure of Local Transport Strategy (LTS) was
submitted to the Community and Enterprise Resource Committee in
April 2024. To allow for the strategy to take cognisance of the latest
Transport Scotland guidance issued in June 2024, consultation on the
draft Local Transport Strategy will now be undertaken in Autumn 2024,
with the draft LTS to be presented to Committee for approval,
potentially, in February 2025.
Amber
Deliver road and
transportation
infrastructure
improvements to
support new
developments, including
those undertaken as
part of the City Deal
Stewartfield Way and East Kilbride Town Centre Project
business case will be prepared in 2024
Stewartfield Way/ East Kilbride Town Centre Enhancement - a report
was presented to Community and Enterprise Committee during April
2024 outlining the revised project. Updated traffic modelling has been
completed and approval for the project's wider aims was obtained by
the Glasgow City Region Chief Executives' Group in June 2024.
City Region Cabinet also approved the scope of the project change
control on 6 August 2024.  This will allow individual Outline Business
Cases (OBCs) for Stewartfield Way and Town Centre proposals.  The
OBC for the Stewartfield Way part of the project has been submitted to
the Programme Management Office (PMO) for initial consideration and
thereafter, Cabinet approval on 5 November 2024.  The Council's
Executive Committee paper is also being scheduled for 13 November
2024.
Green
Encourage active travel
by extending our
network of walking and
cycling routes
Deliver walking and cycling projects/ schemes in line with
agreed 2024-25 capital programme
The Active Travel Tier 1 Funding has been awarded by Transport
Scotland and active travel project works are progressing as follows:
•New facilities for pedestrians and cyclists as part of the
Hairmyres Station project.
•Two pedestrian crossings at Burnbank Road
•Shared pedestrian / cycle crossings at Eaglesham
Road/Redwood Drive/Greenhills Road.
Green
Page 17
64

Page 65

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All school and nursery children have access to nutritious school meals
Action Measures Comments/ Progress Status
Complete the roll out of
free school meals to all
primary children
All P6s and P7s to receive free school meals in line with
Scottish Government timescales
Awaiting confirmation from Scottish Government of when expansion of
free school meals for all primary six and seven pupils will be rolled out.
Report Later
Page 18
65

Page 66

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All residents have the opportunity to access cultural, leisure and outdoor recreational activities to help improve their wellbeing and quality of life
Action Measures Comments/ Progress Status
Work in partnership with
South Lanarkshire
Leisure and Culture
(SLLC) to maintain and
deliver community
facilities
Continue to review leisure and culture community facilities,
maintaining and improving them through the Capital
Programme and Transformational Fund
The Council has appointed a consultant to undertake an independent
objective review of Council properties, including those operated by
SLLC. At the same time, the £13m Transition Fund is helping to
modernise the leisure and culture asset base taking account of the
following requirements: need to adapt and modernise; need to address
energy efficiency and decarbonisation of the estate; need to reduce
liabilities and cover costs of demolition; and need to consider
community accessibility. Phase 1 of the Transition Fund (£8.5m) spend
is taking place this financial year with properties already identified.
Properties are currently being identified for Phase 2 (£4.5m).
The next phases of developing the new Larkhall Leisure Centre are
taking place: Hub South West, in conjunction with South Lanarkshire
Council, have appointed the Tier One contractor. Construction is
expected to commence in autumn 2025, with an indicative opening
date of summer 2027. Now that the design team has been formally
appointed, they have been looking at opportunities to maximise the
facility space within the available budget. Project board meetings and
community engagement meetings are underway.
Clydesdale Way paths project / joint ‘Three Rivers’ venture with
Dumfries and Galloway and Scottish Borders councils, award of
£22,809,416 from Levelling Up Fund (LUF): tender exercise complete.
Project is on hold following General Election. Awaiting instruction from
UK Government following budget decisions.
Country Parks masterplan exercise underway through appointment of
Turner and Townsend to deliver masterplanning exercise plan to invest
in both parks. Project on schedule to complete the masterplan by
January 2025.
Green
Page 19
66

Page 67

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Health and Wellbeing
All residents have the opportunity to access cultural, leisure and outdoor recreational activities to help improve their wellbeing and quality of life
Action Measures Comments/ Progress Status
Begin implementation of
the multi-year Play Area
Undertake consultation with local members and communities
in Hamilton area by March 2025
Initial assessment and designs being undertaken for Bothwell and
Uddingston areas.
Green
Investment Programme Consultation exercise to be completed with schoolchildren
for Rutherglen and Cambuslang before proceeding to design
stage and then putting these works out to tender. Works to
be completed in 2024
Consultation has been completed and works have started on the play
area upgrades in the Rutherglen/Cambuslang area.
Green
Improve health and
wellbeing by offering
attractive and affordable
leisure and cultural
activities delivered with
warmth, friendliness and
individual pride
Implement the South Lanarkshire Leisure and Culture
Strategy (2022-2027), monitor impact on a quarterly basis via
the four SLLC Strategy Implementation Groups, and report
on progress twice per year to the Community and Enterprise
Resources Committee
South Lanarkshire Leisure and Culture (SLLC) are continuing to
deliver the main aim of their five year strategy. The respective groups
continue to meet to ensure they deliver on the strategic priorities within
each of the service areas. All achievements and progress are
documented within the quarterly performance reporting arrangements
to the Corporate Management Team (CMT) within SLC and also
reporting to the SLLC Board, the last meeting of the Board was 4
September 2024.
SLLC are continuing to review the deliverables whilst reviewing their
strengths, weaknesses, opportunities as well as external influences
that may challenge their direction of travel.
Green
Page 20
67

Page 68

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Housing and Land
Vacant, derelict and contaminated land is brough back into productive use
Action Measures Comments/ Progress Status
Agree and implement
vacant and derelict /
contaminated land
programme
Implement projects approved within the Vacant and Derelict
Land Fund framework agreed for 2024-25
Cuningar Allotments project - works on site with completion scheduled
for October 2024.
Following completion of Greenhills Road contractor reinstatement
works will be scoped to ready the site for market.
2024/25 Vacant Derelict Land Fund (VDLF) Delivery Plan - scheduled
to go to Community and Enterprise Committee in November 2024.
Green
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
Prioritise business
development advice,
support and financial
assistance to ensure
businesses are able to
continue to operate,
whilst creating the right
conditions for low
carbon economic growth
Deliver programmes, services, and events to businesses
around sectors, location, and themes (e.g., food and drink,
tourism, construction, low carbon, innovation,
internationalisation, collaboration, and young enterprise)
The following activity related to programmes, services and events to
businesses have been delivered:
Food and Drink: Conclusion of EAT South Lanarkshire programme.
Tourism: Attendance at Visit Scotland Connect; Travel Trade Event.
Construction: Delivery of Build Lanarkshire Programme.
Low Carbon/Innovation: Launch of South Lanarkshire College's
Sustainable Development Innovation Centre.
Young People: Development and delivery of Shark Reef Programme
(entrepreneurial programme for S3 pupils).
Green
Page 21
68

Page 69

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
South Lanarkshire is an attractive place to start, grow and locate a business
Action Measures Comments/ Progress Status
Support and host the Supplier Development Programme to
deliver events, training and e-commerce support to SME’s or
third sector organisations who are interested in working with
the public sector
The Council continues to host and provide support to the Supplier
Development Programme who continue to provide a range of training
and events to SME's/third sector organisations.
Green
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Promote sustainable
economic development
across South
Lanarkshire
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of the South Lanarkshire Economic Strategy (2022-2027)
Annual report was presented to Community and Enterprise Resource
Committee in April 2024.
Complete
Deliver the Levelling Up
Funded projects
Delivery of the Levelling Up Fund grant funded projects
through the Clydesdale Way and Shawfield Remediation with
a value of £6.7m in 2024-25
The final onboarding of both projects between the Council and the UK
Government, and Dumfries and Galloway and the UK Government,
have been delayed subject to review by the UK Government of spend.
Further information expected in the 30 October 2024 Budget
Statement.
Clydesdale Way: The procurement exercise for the  Project
Management Contract has concluded and the contract can be
awarded if/when the Levelling Up Fund (LUF) award is confirmed.
Shawfield: the Council continues to work closely with Clyde Gateway
who are fully sighted on the UK Government's (UKG's) position
regarding the LUF and the implications of the current UK Government
spending review.
Amber
Page 22
69

Page 70

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Positively enhance the
benefits of tourism
across South
Lanarkshire by
delivering the very best
Prepare an annual progress report for Community and
Enterprise Resources Committee, demonstrating the impact
of South Lanarkshire Tourism Strategy (2022-2025)
Annual report was presented to Community and Enterprise Resource
Committee in April 2024.
Complete
for our visitors, our
businesses, our people,
our communities, and
our environment
Begin the refresh of the South Lanarkshire Tourism Strategy
for 2025-2028
Work on refreshing the South Lanarkshire Tourism Strategy is
continuing in line with the target to report in April 2025.
Green
Champion the social
enterprise sector and
invest in start-up and
growth of our local
social enterprise
Prepare an annual progress report on the Social Enterprise
Strategy approved in May 2023 for Community and
Enterprise Resources Committee
An annual update for 2023/24 on the Social Enterprise Strategy has
been prepared and progress will be reported to  Community and
Enterprise Resource Committee in line with agreed timescales.
Green
Income generating
projects will be scoped
across all council
resources to identify
viable projects with a
focus on green
initiatives including
exploring options for
delivery and funding
Liaise with all Council resources, third parties and funders to
identify new opportunities for generating income and
consider a risk analysis of each opportunity
Work is ongoing to explore revenue generating opportunities for the
Council.  An update report will be provided to the Executive Committee
in November 2024 which will also include a risk analysis for each
opportunity.
Green
Page 23
70

Page 71

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Economic development and growth in South Lanarkshire is fair, inclusive, sustainable and low carbon
Action Measures Comments/ Progress Status
Develop single door
approach to economic
development and inward
investment activity which
links employment, skills,
business support and
planning
Undertake activity (i.e. Lanarkshire Business Events website
/ supports to national themed weeks i.e. women in business
week) aimed at increasing the number of companies
engaged with partners which lead to improved performance
and turnover, increased employment, innovation, investment
and internationalisation
Business engagement, including face to face engagement, continues
to be undertaken. Visits to businesses supported via grants being
carried out.
Green
Consult with community
organisations and
develop a Rural Action
Plan maximising existing
and future funding
through Community Led
Local Development and
Renewable Energy
Fund
Deliver the Rural Action Plan and report to Rural Task Force
in November 2024.
Update report to be prepared in October 2024 for the rural task force
on delivery of the new priorities.
Green
Page 24
71

Page 72

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Thriving town and neighbourhood centres provide a focal point for local communities
Action Measures Comments/ Progress Status
Complete East Kilbride
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment.
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
Negotiations are ongoing in line with agreed targets. Regular updates
are being provided to senior officers and will be reported to Committee
at the appropriate time.
Green
Complete Hamilton
Town Centre masterplan
and deliver initial actions
to enable the delivery of
realignment
Negotiate and agree terms of masterplan delivery
programme.  Deliver early projects to support programme of
securing change
Following completion and approval of the masterplan, a delivery
structure and programme of activity will be finalised. Officers have
considered the broad principles of how each element can be delivered
and an appropriate funding model.
Key projects are:
Newcross Centre – closure and redevelopment of the centre.
Regent Centre Sale and partnership agreement - sale and
redevelopment of existing centre which is at the end of its useful life.
Bairds redevelopment – consider options for redevelopment
Town Square repurposing – refresh this vital public space for the future
Vogue redevelopment – consider options for redevelopment.
Negotiations are ongoing in line with agreed targets. Regular updates
are being provided to senior officers and will be reported to Committee
at the appropriate time.
Green
Page 25
72

Page 73

IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
IMPROVe - SLC Performance Management System                                                                                                                                                                                                  Report printed on Monday 28 October 2024
Resource Plan actions and measures South Lanarkshire Council - Community and Enterprise
Our Economy
Customers experience high quality and improving council services
Action Measures Comments/ Progress Status
Implement the Frontline
First Fund
Identify and implement a programme of projects to deliver
the Frontline First Fund
Full programme of works continue to be implemented across the
authority to deliver environmental improvement via frontline first
funding.
Year 1 of the 3 year fund (totalling £3.5m) fully implemented and
includes, for example, improvements to road drainage through a gully
cleaning and drainage repairs programme and clean-up of the Glen
Dessary Monument site in East Kilbride and Ferniegair War Memorial.
Locations are now being collating for year 2 of the fund (from
November 2024) and will be looking to retain seasonal workers over
the winter period allowing grounds teams to deliver the additional
environment improvement works across South Lanarkshire.
Green
A people-centred approach to recovery is implemented to help individuals, communities, businesses and the social and third sector thrives
Action Measures Comments/ Progress Status
Deliver effective
Employability Services
to support individuals
and business
Monitor and adjust the delivery plan agreed via the South
Lanarkshire Local Employability Partnership (SLLEP) and
Community Planning Partners
The annual investment plan was agreed in partnership with the Local
Employability Partnership (LEP) and submitted to Scottish
Government. The plan is reported quarterly and reviewed through
regular meetings of the LEP and operational sub-group.
Green
Page 26
73

Page 74

74

Page 75

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Employment Land and Property Market Analysis
Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of the conclusions of the recently completed Employment Land and
Property Market Analysis
 advise that the outcomes of these reports will inform the future economic
development policy and any future investment by the Council
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the conclusions in the report be noted, and the use of the Employment
Land and Property Market Analysis reports as the guiding documents for
future management and investment in employment land and property by the
Council, be approved;
(2) that the next steps identified in the Employment Land and Property Market
Analysis reports, and the actions outlined around specific sites in Rutherglen,
East Kilbride and Lanark, be approved; and
(3) that it be noted that officers are engaging with Glasgow City Region in regard
to proposals around a regional wide Enabling and Delivering Commercial
Space project. 
3. Background
3.1. In March 2022, the Scottish Government published its National Strategy for Economic
Transformation.  The 10-year Strategy provides a set of key priorities and actions
with a vision of achieving a wellbeing economy that is prosperous for all the country’s
people and places. A wellbeing economy is one that delivers economic prosperity
across social, economic, and environmental dimensions. This includes capitalising on
Scotland’s most advantageous economic opportunities such as the transition to a net
zero economy and a green recovery from the Covid-19 pandemic and reducing
socio-economic inequalities.  
7
75

Page 76

3.2. One aspect of the Strategy’s vision is for Scotland to be ‘the best place to start and
grow a business’, however, Scotland falls behind other countries in terms of its
productivity as too few businesses are starting-up or scaling-up, with limited access to
infrastructure a recognised factor. Meanwhile, the Strategy’s inclusive growth aims
will require investment in high productivity sectors. Additionally, the transition to net
zero offers new market opportunities for example in energy, manufacturing and
finance. Having an adequate supply of employment land and property in the correct
locations is a factor in each of these aims. 
3.3. To understand the South Lanarkshire employment land and property supply, Ryden
LLP property consultants were appointed to provide employment land and property
market analysis for South Lanarkshire. This work was implemented in four parts to
form a suite of reports which Ryden has prepared to inform the next Local
Development Plan (LDP3) and the Council’s wider planning, regeneration and
property portfolio activities. The four reports, along with the overarching Summary
Report consider the employment land and property markets for:-
 East Kilbride
 Hamilton, Blantyre and Larkhall
 Clydesdale
 Cambuslang and Rutherglen 
3.4. The information used to formulate the reports has come from a range of sources
including recognised electronic data sources.  Site visits were also undertaken, and
the views of occupiers were sought.  Input was also invited from a range of public
and private sector professionals from the commercial property market and drawing
this data and information from multiple sources has enriched the final reports and the
quality of the information contained within. 
3.5. Each of the reports follows the same structure to enable comparison to be made and
overarching data to be compiled and key information includes:- 
 a strategic economic and planning policy context for the property markets
 core market analysis covering industrial and office property
 assessment of employment land and development activity
 a review of funding sources for employment land
 identification of market potential and possible actions 
4. Market Potential and Analysis
4.1. Detailed reports have been produced for each of the areas detailed in paragraph 3.3
above and the following gives a broad indication of the conclusions reached in each
of these reports.  Further details and more extensive information are available in the
completed reports. 
4.2. East Kilbride 
Planning policy allocates a range of employment sites which it assesses as
adequate to meet potential demand across South Lanarkshire.  However, the
marketable supply in East Kilbride is very low with only four available plots and this is
inadequate to provide a choice for potential developers and occupiers.  The site at
Langlands West is the only remaining strategic site in the town and one of few
across the city-region.    Due to the limited supply of sites in the area it is the
intention to bring this site to the market in the near future. This will be promoted on
the Councils new Invest South Lanarkshire Website. 
76

Page 77

4.2.1. Industrial properties in East Kilbride were generally constructed in the same era
(1970’s) and this has resulted in premises becoming obsolete and requiring
refurbishment in a similar timescale.  Ryden recommends that that the existing
employment property stock should be replaced or upgraded at a rate of 215,000sq.ft.
(20,000sq.m) per annum. 
4.2.2. The following key points are highlighted in the Ryden study:- 
 East Kilbride has a current industrial property stock of 7.76 million sq.ft., which
is equivalent to 51% of the South Lanarkshire’s industrial floorspace.  The report
highlights that East Kilbride is a significant magnet for industrial activity.  
 The town’s industrial property vacancy rate has fallen to a low of 3.1%, the 32
premises on the market offering a mix of qualities, locations, sizes and costs. 
 The current take-up rate for 2023 is 40 units in the year and demonstrates a
wide range of occupier types. Take-up rates peaked at 56 deals in 2022. 
 The majority of market activity relates to industrial units smaller than 5,000 sq.ft.,
however there is also an active market for medium-sized units above this size
which is less well met by current supply.  
 While there is a case for new development, the economics of this have faltered
recently with rents for the available industrial units range being quoted between
£4 per sq.ft. for very basic older units up to £9.50 per sq.ft. for new build units at
Langlands. 
4.2.3. The office market is in the post-pandemic process of moving to smaller, better-quality
offices to meet Environmental, Social and Governance (ESG) requirements and
hybrid/home working requirements. East Kilbride has a significant stock of older and
modern offices with a marketed vacancy rate of 4.8% in 32 suites in 11 buildings,
which may understate under-use of offices and availability in flexibly managed
buildings. Unlike industrial property with asking rents for office space in East Kilbride
ranging between £8.60 and £16.50 per sq.ft, rents are not at a level which could
support new development. Rents of £20-25 per sq.ft. would be required to support
new-build office development. Formal take-up of offices averages 20 per annum, the
large majority of these small although again there are some medium-sized office deals.
The current supply in sub-divisible office buildings is capable of responding to a wide
range of requirements indicating flexibility and an ability to respond to demand. 
4.3. Hamilton, Blantyre & Larkhall
The Hamilton market area that includes Blantyre and Larkhall contains 4.06m sq.ft. of
industrial stock which represents 23% of all industrial stock in South Lanarkshire,
making it one of the principal market areas within the local authority area. The level of
industrial stock has fallen since 2010 as the result of large factory demolitions with the
land now being used for residential.  The majority of industrial stock in the Hamilton
market area was built in the 1980s and 1990s which means there is an issue of
looming obsolescence, notably in Blantyre which is a key location for local businesses.
In making a geographical  assessment of the distribution of industrial employment
land within the Hamilton area 3 sites totaling 0.76 hectares (1.88 acres) are in
Hamilton. 
77

Page 78

This accounts for:- 
 5% of the allocated land area in the Hamilton market area, and less than 1% of
allocated land in South Lanarkshire
 2 sites totalling 4.61 hectares (11.39 acres) in Blantyre, which accounts for 32%
of the allocated land area in the Hamilton market area, and 1% of allocated land
in South Lanarkshire
 the remaining 4 sites are in Larkhall total and 9 hectares (22.24 acres), accounting
for 63% of the allocated land area in the Hamilton market area, and 3% of
allocated land in South Lanarkshire
 the site at South Larkhall Canderside alone accounts for 42% of the Hamilton
market area’s allocated land 
4.3.1. Reflective of wider regional markets, there is low industrial floorspace availability in
the Hamilton market area of 5% (vacancy rate). Small units (under 5,000 sq.ft) in
Hamilton and Blantyre appear to be particularly in demand as reflected by recent take-
up and enquiries, however, there is a lack of choice for occupiers with very limited
supply of this nature on the market. While there is a case for new development, the
economics of this have faltered recently. 
4.3.2. The office market is in the post-pandemic process of moving to smaller, better-quality
offices to meet hybrid working requirements. The Hamilton market area accounts for
55% of South Lanarkshire’s total office floorspace. Its vacancy rate is 19% which is
much higher than the local authority rate of 9.9%, however this can be explained by
the Ochil House building at Hamilton International which offers 80,000sq.ft of
floorspace over 4 floors and this skews this vacancy rate considerably.  Much of this
stock is relatively modern and includes sizeable provision within Hamilton town centre
and Hamilton International Park as well as more flexible business centre type
accommodation. There is sufficient choice of stock available on the market and,
therefore, no demand for new build accommodation unless occupier led. 
4.4. Clydesdale Area 
Clydesdale, with the towns in scope namely Carluke, Lanark, Lesmahagow and Biggar
and a large rural area, has an industrial stock of 1.7 million sq.ft., in an estimated 217
units, including both occupied and vacant industrial buildings. This is around 8% of
South Lanarkshire total industrial stock by floorspace. 
4.4.1. The Report identities that working from the study area’s industrial floorspace of
approximately 1.7 million sq.ft. and assuming a building lifespan of 60 years, c.28,000
sq.ft. of new development or comprehensive refurbishment would be required each
year to fully replenish the stock. Set against this, Clydesdale’s industrial stock is not
particularly old or obsolete in design terms other than on certain estates, new
development is not common, and buildings may be upgraded to continue to meet
occupiers needs. The Report identifies that the more pressing need in Clydesdale is
to ensure that the key employment centres have a supply of units, while monitoring
the wider stock for any signs of obsolescence (through age, condition, or
environmental/ energy performance). 
78

Page 79

4.4.2.  Clydesdale is not a core office location. It has an office stock of c. 200,000 sq.ft. which
is equivalent to 6% of South Lanarkshire’s total office floorspace. Office market
potential is affected by the shift to home and hybrid working but is supported in
Clydesdale by local services based in the communities. The performance of older
existing stock in terms of the risk of rising vacancies requiring repurposing  should be
monitored, as should the success and impacts of the emerging new community-based
developments. 
4.4.3. Take-up of employment land in Clydesdale has potentially been suppressed by an
absence of effective supply. The analysis carried out as part of the Report identifies a
requirement to support this sector and the bringing forward of fully serviced sites such
as the Council owned site on South Faulds Road Lanark, most likely for owner-
occupied development though potentially also for Council direct development should
be considered. 
4.5. Cambuslang/Rutherglen 
The Cambuslang/Rutherglen market area contains around 18% of all industrial stock
in South Lanarkshire.  It is a principal industrial location and is very well connected to
the wider Glasgow conurbation, particularly around the M74 motorway.  The area’s
2.88 million sq.ft. of industrial floorspace includes some larger facilities, one of which,
the TATA steelworks at Clydebridge in Cambuslang (441,343 sq.ft.) is currently being
marketed for redevelopment.  Rents for prime industrial stock around the Glasgow
conurbation vary significantly by unit size, from around £9 per sq.ft. for medium to
larger buildings up to potentially £15 per sq.ft. for small prime trade counter units. The
stock was developed over many decades and obsolescence is possible among older
estates buildings. 
4.5.1. The vacancy rate for industrial property in the study area is exceptionally low at only
1% (one property at Ashton Road, Rutherglen Industrial Estate).  Demand is focused
upon units between 1,000 and 5,000 sq.ft. where there is currently no supply, as well
as some medium to larger units given the area’s locational advantages.  There is
regular development of new industrial space in the market area, the Clyde Gateway
Urban Regeneration Company (URC) continues to be active in this area and the
Council itself having proposals for high quality industrial space on a site on Cathcart
Road, Rutherglen and although development economics are currently challenging
there are a notable number of competing projects in the wider sub-region outside of
the study area. 
4.5.2. The office market is moving to smaller, better-quality offices to meet ESG requirements
and hybrid/home working.  Cambuslang/Rutherglen accounts for around 15% of South
Lanarkshire’s total office floorspace in its town centres and business parks/estates. 
Some office space is available within the area’s managed business centres but overall
the availability is low.  Annual take-up of offices is also low and is focused on smaller
suites.  Rents are competitive for occupiers but would not support new office
development. Magenta, developed by Clyde Gateway URC is a good example of what
the market desires. The URC’s continued work, supported by the Council, to meet
changing demands in this area is seen as invaluable and would encourage further
investment.  
79

Page 80

4.6. South Lanarkshire Wide 
The summary report brings together the research and findings of the four localised
reports.  Where required, it updates underlying information to present a contemporary,
South Lanarkshire-wide market picture. 
4.6.1. The industrial property market in South Lanarkshire is extensive, reflecting the area’s
role and connectivity with the wider conurbation. Larger towns with extensive
employment land and property include East Kilbride, Hamilton & Blantyre, and
Cambuslang & Rutherglen as well as smaller settlements to the south.  The Summary
Report highlights the following. 
4.6.2 South Lanarkshire’s current stock of industrial property is estimated at 15.9 million
sq.ft. This industrial stock includes large facilities such as TATA steelworks in
Cambuslang (441,000 sq.ft., vacant), Coca Cola (323,000 sq.ft.) and Sainsbury’s
Distribution Depot in East Kilbride (274,000 sq.ft.). 
4.6.3 South Lanarkshire’s principal industrial development eras were the 1970s (20% of
stock), 1980s (25%) and 1990s (17%). This means that more than half of the local
authority area’s industrial stock is at least 44 years old. While age is not the only
guide to property obsolescence, detailed analysis within Ryden’s subregional
reports identifies at-risk stock as well as instances of industrial properties being
refurbished. Energy performance is an increasing concern both in terms of carbon
emissions and energy costs. 
4.6.4 As with West Central Scotland as a whole, South Lanarkshire has low industrial
property availability, currently sitting at 3.8%. At this level of vacancy, it is likely that
occupiers will experience restricted choice of premises in terms of locations, sizes,
specification, and quality / modernity. The vacancy rate has fallen from a high of
9.1% recorded in 2013 which was the tail-end of the weak market following the
global financial crisis. 
4.6.5 South Lanarkshire has an office availability rate of 12%. This is marginally above
the 11% office availability rate for Glasgow City Region and has been rising
recently. The current office supply of c. 443,000 sq.ft. is contained within 43 offices;
however, the supply is very adaptable to sub-divisible and flexible options in
serviced offices/ business centres. This being the case the Council will focus
available resources around the industrial sector rather than office provision. 
4.6.6 The market assessment reports provide a summary of the existing employment
supply and demand across the Council area.  The reports also identify opportunities
and priority areas where the Council and its partners could most effectively focus
future investment. 
4.7. Conclusion
In conclusion the Summary Report identifies several actions that should be pursued.
These include measures and recommendations to:- 
 stimulate the refurbishment of existing industrial stock
 actively encourage the creation of development ready plots
 look at where the Council can intervene in the market to ensure new supply of
industrial and office properties
 a masterplan for Langlands West should be developed to ensure a supply of
small medium and strategic sites 
80

Page 81

 review Shawfield and explore its potential for a range of uses as well as offices. 
An ancillary piece of consultancy work is currently being prepared by Ryden.
The draft identifies that the demand for high quality office that led to the
Shawfield Masterplan has now changed and although there will continue to be
specific requirements a mixture of industrial, bioscience, high value
manufacturing and uses requiring extensive land provision should be
considered 
5. Funding
5.1. Historically, the European Union Structural Funds would have been a source of
funding support.  In recent years, several new funding streams have become
available including UK Levelling Up Funding and Investment Zones.  Political
changes at Westminster, however, means that there is uncertainty as to the future of
these funds and any replacements.  Pressure on Scottish Government budgets has
also restricted funding initiatives such as Regeneration Capital Grant Fund (RCGF).  
City Deal and Scottish Enterprise, however, have a role to play where there may be
opportunities. 
5.2. From a public sector funding perspective, South Lanarkshire Council is eligible to
apply to a number of UK Government and Scottish Government funds as outlined
above.  Efforts should continue to prepare funding applications associated with
employment land, although competition is fierce and the award of funding
unpredictable in this challenging economic climate. 
5.3. Outwith city centres and strategic transport corridors, market failure is common where
public sector intervention in the property market is often required to support economic
development. The Council will continue to pursue identified opportunities but going
forward the private sector will be key to investment and supply. A strong local
economy that attracts good quality tenants will ensure a healthy property market that
can attract investment. 
6. Next Steps and Timescale 
6.1. The Summary Report recommends a number of possible interventions and
recommendations, and it is intended that these will influence actions incorporated into
future economic development activity.  These priority areas and potential
interventions, where external funding will require to be identified, include:- 
Targeting existing industrial stock
 seek to support to landlords and occupiers to upgrade premises through
incentivisation
 focusing direct Council investment in stock in poorest condition and undertaking
exemplar projects
 identifying funding sources
 demolition and/or redevelopment of areas of obsolescence in Council owned
stock 
Serviced plots between 0.2 and 0.5 hectares
 development ready plots are undersupplied so monitor the supply of private
sector sites
 bring forward sites in public ownership for development and promote via the
Local development Plan and “Invest South Lanarkshire” website
 review the Vacant & Derelict Land supply 
81

Page 82

 promote the Hamilton area, with its excellent transport links and easy access to
Glasgow as a sub-regional location via the “Invest South Lanarkshire” website
and targeted publicity
 directly progress a first phase of development at Langlands West 
Monitor industrial development
 review and monitor the private sector to identify projects that will address the
undersupply of modern units
 identify opportunities where selective market intervention could be provided
 target potential funding opportunities which would support this sector 
Monitor the office market
 direct support for flexible office space
 reinvesting in existing Council managed office buildings
 monitor the loss of office stock to the supply
 monitor the ‘Cat A’ office market
 seek to explore alternative property management models for the office sector 
Development of Langlands West
 maximising the potential opportunities to be provided by the former single user
site
 developing a phasing masterplan including the development of a first phase of
small plots and units
 identifying opportunities for medium relocation plots
 retention of a strategic site area for potential inward investment 
Development of Magenta @ Shawfield
 in conjunction with Clyde Gateway review the opportunity to diversify the market
at Magenta whilst retaining the option for core office investment
 identify opportunities for further small-scale office development
 review and assess high value employment uses
 assess potential amenity uses 
6.2. All the above will have to be undertaken against the existing background of fragmented
demand data and of managing existing funds within a changing funding environment. 
The Council will have a role to play in the delivery of many of these actions identified
in the reports, although in many cases the role will be that of regulatory body with a
limited direct involvement in delivery. 
6.3. This report is seeking approval to adopt the review reports as a basis to move forward
and approvals relating to specific projects including funding, delivery and lead partners
will be taken to the appropriate committee for approval at a future date.  
82

Page 83

6.4. The Council owns a site on Cathcart Road, Rutherglen. This site has previously been
cleared of redundant commercial buildings and in support of the findings of the
Analysis Report it is proposed that the redevelopment of the site be brought forward
to deliver high quality lettable commercial space that will benefit from appropriate
renewable and sustainable design and technologies.  Budget from the Shared
Prosperity Fund was previously identified to support the project and an application was
made for support from the Scottish Government Regeneration Capital Grant Fund
(RCGF).  As a result of current financial pressures, the Scottish Government has
deferred decisions on the RCGF programme.  Consequently, an alternative funding
package will have to be identified to deliver this project. This may include the Vacant
and Derelict Land Fund, Glasgow City Region, Enabling and delivering Commercial
Space project and other South Lanarkshire Council Managed Funds.  The first stage
is the procurement and appointment of a Design Team, and this process is currently
underway. Once the appointed Team have concluded feasibility and statutory
consents are in place, budget permitting, stage 2, the delivery of physical works will
be taken forward. 
6.5. The 21ha site at Langlands West has been identified as a prime opportunity for the
Council and its partners to address some of the issues raised in the reports and it is
intended to review the masterplan to identify the opportunities for a first phase of small
plots and units, medium sized relocation plots and the retention of a strategic site area
for potential inward investment. 
6.6. Community and Enterprise Resources are looking at further opportunities at key sites
including South Faulds Road, Caldwellside Industrial estate, Lanark, Canderside,
Larkhall and Conexus, Coalburn. 
6.7. Key to a successful employment sector is the marketing of South Lanarkshire. The
Councils “Invest South Lanarkshire” website is now built and this will serve as an
important platform for the marketing of key sites and property and serve as the
gateway for private sector investors/developers to contact the Council. 
7. Employee Implications
7.1. There are no employee implications through the endorsement of the review reports. 
8. Financial Implications
8.1. The costs for the Council in preparing the property Analysis Reports have been
funded with support from the Shared Prosperity Fund. 
8.2. As noted, the Report identifies a number of actions and projects which will require
funding. Each will be considered on an individual basis and will be subject to separate
approvals. It is the intention that external funding will lead the delivery of investment. 
8.3. Implementation of actions will focus on the co-ordination of activity that will largely be
funded through external funding.  The financial resources required to deliver the Action
Plans will be considered on a project-by-project basis. In addition, the Report provides
a basis to support external funding bids from a range of sources, however, it is
important to note that much of the success of the plan will relate to support and
investment from the private sector. 
83

Page 84

9. Climate Change, Sustainability and Environmental Implications
9.1.  The Report was prepared having regard to the existing and emerging challenges
around climate change and sustainability.  It is intended to complement and comply
with the Council’s and wider communities’ aspirations in the area. 
10. Other Implications
10.1.  The risks associated with not supporting the report outcomes is that South
Lanarkshire’s employment land and property sector will not have a co-ordinated
approach to its response to the many challenges it faces.  The performance of this
sector has a significant impact on the local economy and quality of life for South
Lanarkshire citizens. The Council’s reputation could also be damaged if it is not seen
to actively support the sector. 
11. Integrated Impact Assessment and Consultation Arrangements
11.1. Integrated Impact Assessments will be undertaken as individual projects are
developed. 
11.2.  Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in
employment land and property within South Lanarkshire.  This consultation and co-
operation will continue throughout the duration of the initiative. 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
John Archibald, Project Development Officer, Enterprise and Sustainable Development
Services
E-mail: john.archibald@southlanarkshire.gov.uk 
84

Page 85

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Scottish Government Vacant and Derelict Land Fund
Programme 2024/2025 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise the Committee of progress made during 2023/2024 in implementing the
South Lanarkshire Delivery Plan for the Scottish Government financed Vacant
and Derelict Land Fund (VDLF) and to agree the VDLF Programme for
2024/2025
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the progress made during 2023/2024 in delivering the agreed Vacant and
Derelict Land Fund Programme in South Lanarkshire be noted; and
(2) that the allocation of funds in the 2024/2025 Vacant and Derelict Land Fund
Delivery Plan, as set out in paragraphs 5.1 and 5.2, be approved. 
3. Background
3.1.  The Scottish Government’s VDLF allocation to South Lanarkshire for the financial
year 2023/2024 was £687,000. A Local Delivery Plan was produced and approved
by Committee on 29 August 2023 to implement the key objectives of the VDLF which
are to:- 
 tackle long-term Vacant and Derelict Land
 stimulate economic growth and job creation
 develop a diverse, sustainable environment with a focus on temporary and
permanent greening
 support Communities to flourish and tackle inequalities 
3.2. The Council acknowledges that vacant, derelict, and contaminated land acts as a 
major constraint to the re-development of land and impacts on the quality of life of 
many residents.
8
85

Page 86

3.3. The Scottish Government’s VDLF is available to a limited number of local authorities
in Scotland including South Lanarkshire Council, North Lanarkshire Council and
Glasgow City Council.  The eligibility criteria for projects require the following
conditions to be met: 
 Sites have been on the Vacant & Derelict Land Register for a minimum of 15
years.
 Eligible sites must be more than 0.1 hectares in size.
 VDLF will not support housing related projects on eligible sites.
 Sites on the Vacant & Derelict Land Register which are privately owned are
subject to Subsidy Control rules on grant support amounts. 
3.4. South Lanarkshire’s continued inclusion on the limited list of councils who are in
receipt of VDLF awards is primarily down to the existence of complex vacant and
derelict sites within the Council area. 
3.5. Other funds such as Place Based Investment Fund, Clyde Mission and Vacant
Derelict Land Investment Programme have previously been accessed by the Council
and community-based organisations to tackle sites that are vacant and derelict but
may not qualify for support under the VDLF criteria. 
4. Progress Achieved in 2023/2024
4.1. The 2023/2024 Local Delivery Plan was designed to build on work undertaken over 
recent years on key projects located within South Lanarkshire as follows: 
 Langlands West Strategic Industrial Development Site, East Kilbride - Langlands
West is situated on the south-side of Greenhills Road, adjacent to the
established Langlands industrial area on the southern edge of East Kilbride. The
whole site was originally earmarked for industrial development in 2004. 
Infrastructure works were undertaken between 2005 and 2007 with the site was
split into two areas.  Site A has a developable area of 11.81 hectares and Site B
a developable area of 9.24 hectares. Following the opening of the City Deal
funded Greenhills Road project in June 2023 and, thereafter, the very recent
reinstatement works to the area utilised as a contractors site compound for those
works,  project proposals are now  being developed and implemented to include: 
 Structural landscaping / improvements to encourage biodiversity
 Improved access provision relating to on-site roads infrastructure
 Upgraded site servicing (power/ drainage/ water supply/ telecoms)
 Sustainable drainage (SUDS) improvements 
The Langlands West project will be promoted as a strategic employment location 
for advanced manufacturing and engineering activity and is already attracting 
interest from a range of users keen to locate in the area. 
 Clyde Cycle Park Phase 2 – Development of Community Cycling / Active Travel
Facilities - Clyde Cycle Park (CCP) is an ambitious project that is creating a high-
quality combination of cycle circuits in Cambuslang to promote community,
commuter and competition cycling. CCP have developed a first skills cycling
circuit and associated facilities.  Development planning is progressing with the
support of the VDLF grant to facilitate an extension of the circuit and improve the
facilities on offer.  E-bike charging will also be provided utilising PV panel
technology
86

Page 87

 Carnwath Community and Business Enterprise Hub – Town Centre Community
and Business Space - This transformational project has been developed in
Carnwath village centre and is a long-standing ambition of the local community.
It is focused on a former petrol station site that has been on the vacant and
derelict land register for many years. A contract to commence construction of the
hub has been signed and all statutory approvals are in place to commence work
on site. The hub will provide residents of all ages, community groups and
businesses with access to advice, information and guidance as well as business
opportunities, educational, social and leisure activities.     
5. 2024/2025 VDLF Proposal
5.1. The Scottish Government’s VDLF allocation to South Lanarkshire for the financial
year 2024/2025 is £425,000.  A Local Delivery Plan (LDP), compiled following a
review of opportunities that comply with the eligibility criteria for the Fund, has now
been produced, submitted and approved by Scottish Government to implement the
key objectives of the Vacant and Derelict Land Fund as follows: 
 Cathcart Road, Rutherglen Industrial Development (VDLF allocation £350,000): 
The proposed industrial development site at Cathcart Road is situated to the
west of Rutherglen town centre, within the Burnhill area, one of South
Lanarkshire’s most deprived SMID wards.  It lies immediately adjacent to the
Clyde Gateway URC area.  The site was originally used for many decades by a
commercial dry-cleaning business which relocated in 2009.  The site is owned by
the Council. The area is a well-established location for small scale business and
industrial users due to its good transport links and access to labour markets.
The site measures approximately 0.3 hectares and sits beside the Cityford Burn. 
Site investigations have indicated there is little required in the way of remediation
due to its historic use. 
Proposals indicate the site can accommodate up to 600 sq.m of industrial space,
suitable for subdivision, and incorporating net zero features including PV panels,
heat pumps, destratification fans, EV charging and battery storage. 
Project proposals will entail the following works: 
 Development of the project design and statutory consents
 Site consolidation
 Site servicing (power/ drainage/ water supply/ telecoms)
 Sustainable drainage (SUDS) improvements 
The Cathcart Road project will be promoted as an employment location for 
advanced manufacturing and engineering activity, suitable for both local SME’s 
and inward investment.  
 Clyde Climate Forest (VDLF allocation £10,000): The Clyde Climate Forest
(CCF) vision is to plant the right trees, in the right places to help nature recover
and thrive, to protect and mitigate against climate change, and to create an
ecologically secure environment for future generations.  Target neighbourhoods
are being identified across the urban area which have low levels of existing tree
canopy and are particularly vulnerable to the impacts of climate change. 
Fourteen ‘high’ priority sites have been identified with the intention being that up
to 10 sites could be suitable for planting.  It is estimated that once the
investigation works are complete and tree planting works are undertaken up to 2
87

Page 88

hectares of long term vacant and derelict land could be removed from the V&D
land register. 
 Cuningar Loop Food Growing Project, Rutherglen – This transformational project
at Cuningar Loop (within the Clyde Gateway URC area) has been developed to
provide much needed food growing space in the Rutherglen area. The tender
returns for the project were significantly above expected levels and additional
VDLF funding would complete all aspects of the project to the standard originally
envisaged including the provision of an area within the site to accommodate high
quality raised beds and a structure to allow storage of tools and equipment as
well as providing shelter to users during inclement weather. The contractor
undertaking the main contract works can implement these additional items prior
to project completion in late November 2024.  This additional work brings the
VDLF investment in the project to over £700,000. 
5.2. The above projects represent a balanced programme of activities which address
Scottish Government priorities. The allocation of funding on these projects  is
proposed as:
 £350,000 – Cathcart Road, Rutherglen, Industrial Site Development
 £10,000 – Clyde Climate Forest
 £65,000 – Cuningar Loop Food Growing Project, Rutherglen 
6. Employee Implications
6.1. There are no employee implications.  Proposed workstreams can be managed using 
existing staff resources. 
7. Financial & Risk Implications
7.1. The VDLF programme will be funded from the Scottish Government Vacant and 
Derelict Land Fund allocation. 
7.2. The key risks associated with these projects are focussed on the potential for cost
overruns or delays to the programme. These risks will be managed by Community &
Enterprise Resources.  An appropriate level of contingency funding is included in the
project budgets to mitigate risk. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The initiative identified in this report will be delivered using a range of 
sustainable techniques and models, having regard to best practice and current 
construction industry guidance. 
9. Other Implications
9.1. There are no other implications and/or risks associated with this report. 
10. Integrated Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy and, therefore, no 
impact assessment is required. 
10.2. This report has been prepared in consultation with Finance & Corporate Resources. 
88

Page 89

David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Outcomes
 Caring, connected, sustainable communities
 Good quality, suitable and sustainable places to live
 People live the healthiest lives possible 
Previous References
 None 
List of Background Papers
 Community & Enterprise Resources Committee 29 August 2023
 South Lanarkshire Council 2024/25 Proposed VDLF Delivery Plan – May 2024 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Iain Ross, Economic Development Manager, Enterprise and Sustainable Development
Services
Email: iain.ross@southlanarkshire.gov.uk
89

Page 90

90

Page 91

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Community Benefit Funds – Renewable Energy Fund
Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to approve grant applications to the Renewable Energy
Fund from:-
[purpose]
 Coalburn Community Action Group
 Healthy Valleys
 Lesmahagow Development Trust 
 Rural Development Trust
 Strathaven Town Mill Arts and Heritage Centre
 Friends of Stonehouse Park
 [1purp]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a grant be awarded to Coalburn Community Action Group of up to £28,410
from the Renewable Energy Fund to upgrade a community nature trail walkway
within the Coalburn area;
(2) that a grant be awarded to Healthy Valleys of up to £177,543.79 from the
Renewable Energy Fund to employ Development Officers;
(3) that a grant be awarded to Lesmahagow Development Trust of up to £225,000
from the Renewable Energy Fund to refurbish village centre property;
(4) that a grant be awarded to Rural Development Trust of up to £189,44.28 from
the Renewable Energy Fund to upgrade and renew core paths;
(5) that a grant be awarded to the Strathaven Town Mill Arts and Heritage Centre
of up to £56,231.01 from the Renewable Energy Fund to restore the Strathaven
Town Mill frontage; and
(6) that a grant be awarded to Friends of Stonehouse Park of up to £49,840 from
the Renewable Energy Fund to restore Alexander Memorial Fountain.  
[1recs]
3. Background
3.1. Since 2004, the Council has collected and administered Community Benefit funding
through the Enterprise and Sustainable Development Service. The Service is
responsible for securing the contributions from windfarm developers, advising
potential applicants, assessing applications and monitoring projects to ensure that
the community benefits associated with each project are delivered. Processes are
continuously reviewed to ensure best practice in grant provision and monitoring is
undertaken to ensure the necessary support is delivered to eligible communities.
9
91

Page 92

3.2. Grant awards above £20,000 require approval from Committee.  Awards below this
level are approved by the Head of Enterprise and Sustainable Development under
delegated authority. All grants awarded are reported annually to the Community and
Enterprise Resources Committee.   
3.3. Several changes were made to the Renewable Energy Fund (REF) criteria at the
Community and Enterprise Resources Committee of 6 February 2024 including
supporting revenue funding, increases to intervention levels and aiming to deliver
larger more strategically impactful projects. 
4. Grant Recommendation
4.1. Application Number 1138 
Coalburn Community Action Group – project value £58,410 
Proposed Grant award £28,410 intervention rate of 49% 
The proposed grant of £28,410 will be funded from Douglas West Windfarm which
contributes into the REF. 
4.2. Coalburn Community Action Group (CCAG) is a community group with its purpose
being: - 
To bring people together to enhance the village and their own surroundings.
To provide a safe environment for all the family to enjoy and interact with
others through community activities.  To enhance the quality of living for all
who live within Coalburn. 
4.3. CCAG has an eight-member management committee with 12 regular volunteers.
Outdoor activities have been a recurring theme within the community action plan for
the area.  Consultation has been undertaken with the community and the project has
been developed to reflect their views. 
4.4. The grant will allow CCAG to upgrade a community nature trail walkway used by
everyone within the Coalburn area. It is a walking route to school as well as an active
nature trail area which requires to be upgraded to make it usable all year round. It
will also connect with all new paths from Lesmahagow to Douglas.   
4.5. The project requires capital funding to carry out all necessary earthworks and
grading to make safe the surrounding terrain of the walkway, installing silt netting,
and a gravel perforated pipe on the existing watercourse to minimise any potential
flooding. 
4.6. The project has been established in response to community demand which will
enhance an existing walkway. 
4.7. The application has been assessed and scored an average of 32.5 out of 53
supporting a grant award of up to £28,410 totalling 49% of eligible costs.
92

Page 93

4.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below: 
Funder Stage Value
Dalquandy Wind Farm Confirmed £10,000
Foundation Scotland Confirmed £20,000
SLC Renewable Energy Fund Grant
(49%) Douglas West. 
For approval £28,410
Total project value   £58,410  
4.9. The project is scheduled to commence in January 2025 and be complete by April
2025. Officers will work with the applicant to monitor progress.   
5. Grant Recommendation
5.1. Application Number 1195 
Healthy Valleys – project value £295,023.65   
Proposed Grant award £177,543.79 intervention rate of 60% 
The proposed grant of £177,543.79 will be funded from Douglas West Windfarm
which contributed to the REF.  
5.2. Healthy Valleys (HV) is an established community-led, asset-based organisation with
its purpose being: - 
As an Anchor Organisation for rural Clydesdale, Healthy Valleys is committed to
reducing health inequalities in rural South Lanarkshire through the provision of
outstanding local services that help preserve and protect the mental and physical
health of individuals, families, and communities, and enable them to live happier
and healthier lives. We are a community-led, asset-based organisation and work
directly with people to identify local needs, provide information and signposting, and
facilitate activities which address these needs and enable improvement in lifestyles. 
5.3. HV management committee has seven members, 50 regular volunteers and eleven
full-time and sixteen part-time staff. 
5.4. The grant will allow HV to employ a Team Leader and two project worker posts,
organisational overheads and equipment. The grant support will cover a three-year
period April 2025 to March 2028 with the funding allowing for the continuation of the
Gear Up pilot year which aims to empower communities through cycling, walking,
and wheeling.   
5.5. The project requires revenue funding to meet the costs to employ development
officers whose key priorities will be defined from The Gear Up team, together with
HV Business Development Lead. HV are working with the Economic Development
Officer for the Douglas Valley Initiative to inform ideas around adventure tourism and
cycling schemes in the area. Gear Up aims to be a lead delivery partner for any
community-led cycling/adventure tourism initiatives which develop within the Douglas
Valley. 
5.6. The project has been established in response to community demand and discussion
with Community and Enterprise Resource officers, to ensure community
development and strategic links continues to support walking and cycling for the
Douglas Valley area and enhance any future adventure tourism developments.
93

Page 94

5.7. The application has been assessed and scored an average of 34 out of 53
supporting a grant award of up to £177,543.79 totalling 60% of eligible costs. 
5.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:    
Funder Stage Value
Clyde Windfarm To be confirmed £117,479.86
SLC Renewable Energy Fund Grant
(60%) Douglas West
For approval £177,543.79
Total project value   £295,023.65 
5.9. The lead in time to the project start date April 2025 will allow officers to confirm
match funding has been secured. 
6. Grant Recommendation
6.1. Application Number 1171 
Lesmahagow Development Trust – project value £225,000   
Proposed Grant award £200,000 intervention rate of 89% 
The proposed grant of £200,000 will be funded from Kype Muir Windfarm which
contributed to the REF. 
6.2. Lesmahagow Development trust (LDT) is a community group with its purpose being:- 
LDT was set up in 2009 with the objective of ‘funding and implementing projects that
will enhance the facilities and environment of Lesmahagow.’ It invested in a
commercial renewable energy project in 2013 through its wholly owned trading
subsidiary, Lesmahagow Ltd. the income from this has enabled it to set up several
projects including allotments, a wide range of activities for older and younger people
and a grant scheme for local initiatives. 
6.3. LDT has a four-member management committee with 30 members and six part time
staff. Consultation with the community has been undertaken and the project has
been developed to reflect the views and needs of the community it represents. 
6.4. The grant will allow LDT to convert a shop locally known as ‘Billys’ in Lesmahagow’s,
Abbeygreen into a mini market. This will establish four rentable stalls within the
building available to local traders and Lesmahagow entrepreneurs. ‘Billys’ will
provide a pathway and pipeline for locally focused social enterprises, that will
increase local employment and benefit other local businesses. Not for profit
organisations will be able to use the space as a shop front for their activities,
providing opportunities for projects to be locally delivered at point of need.   
6.5. LDT will oversee all construction and refurbishment works. ‘Billys’ when converted
will act to encourage local people to support local retailers and make journeys to the
town centre, where they can take advantage of products and services that are locally
sourced and contribute to the circular economy. 
94

Page 95

6.6. The project has been established in response to community consultation and
engagement surveys and included within the LDT Development Plan and the
Lesmahagow Community Action Plan.  
6.7. The application has been assessed and scored an average of 35.5 out of 53
supporting a grant award of up to £200,000 totalling 89% of eligible costs. 
6.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:   
Funder Stage Value
Lesmahagow Development Trust Confirmed £25,000
SLC Renewable Energy Fund Grant
(89%) Kype Muir
For approval £200,000
Total project value   £225,000  
6.9. The project is scheduled to commence in December 2024 and be complete by June
2025. Officers will work with the applicant to monitor progress. 
7. Grant Recommendation
7.1 Application Number 1192 
Rural Development Trust – project value £289,446 
Proposed grant award £189,446 intervention rate of 65% 
The proposed REF grant of £189,446 will be funded from Douglas West windfarm
which contributes into the Renewable Energy Fund 
7.2. Rural Development Trust (RDT) is a Charity with its purpose being:- 
To develop and deliver projects which tackle rural issues and improve life for
residents of rural communities. They have been involved in a variety of projects
in recent years and undertake a range of work including community capacity
building, local energy provision and community transport. 
7.3. RDT has a 7-member management committee, 20 regular volunteers, one full-time
and three part-time staff. Paths connectivity and travel are identified within local
community action plans as priorities and opportunities. Consultation with the
community has been undertaken and the project has been developed to reflect the
views of the community it represents. 
7.4. The grant will allow RDT to complete the final 2km segment of this core path
upgrade from Poneil to Douglas (Main Street/Kirkgate). This route largely follows
existing forestry paths and existing rights of way. All landowners have been
identified, consulted and support the project. 
7.5. The project requires capital funding to complete the 2km section of the route.  Works
will include, signage/interpretation (5 x way markers; 1 x info boards; 1 x signpost),
Access (5 x Self closing gates), Seating (1 x picnic bench), route clearance-
vegetation management/tree removal/access Improvements, bridge repairs, path
upgrade-including ditch works, culverts, drainage works, professional fees and
contingency.
95

Page 96

7.6. The project has been established in response to community demand. The project is
a collaborative effort with Douglas and Glespin Community Council, Douglasdale
Recreation Environment Access and Leisure Group, the Council, landowners, and
other stakeholders. Funding would facilitate the completion of a 10km Active Travel
route extending from the NCN 74 near Lesmahagow through Coalburn to Douglas,
thus enabling safe connections across and through these rural communities. 
7.7. The application has been assessed and scored an average of 37.5 out of 53
supporting a grant award of up to £189,446 totalling 65% of eligible costs. 
7.8. All Renewable Energy Fund awards are subject to suitable match funding being
secured as set out below:   
Funder Stage Value
Ian Findlay Path Fund Confirmed £100,000
SLC Renewable Energy Fund Grant
(65%) Douglas West
For approval £189,446
Total project value   £289,446 
7.9. The project is scheduled to commence in February 2025 and be complete by July
2025. Officers will work with the applicant to monitor progress.   
8. Grant Recommendation
8.1. Application Number 1091 
Strathaven Town Mill Arts and Heritage Centre – project value £56,231 
Proposed Grant award £56,231 intervention rate of 100% 
The proposed grant of £56,231 will be funded from Calder Water Windfarm which
contributes into the Renewable Energy Fund 
8.2. Strathaven Town Mill Arts and Heritage Centre (STMAHC) is a Charity with its
purpose being: - 
To promote and encourage the practice and enjoyment of the Arts in
Strathaven and District to promote an interest in the heritage of the area and
to foster a community spirit in support of these aims. To organise, manage
and present whether with the assistance of local or national bodies art
exhibitions, concerts, stage plays, demonstrations, lectures and performances
and other presentations of an artistic or historic nature. To encourage, assist
and support local amateurs and local organisations of a like cultural or
educational nature. To secure the establishment, maintenance and
management of the Strathaven Town Mill Buildings and any other premises
which may be suitable as or as part of an Arts Centre for the benefit of the
people of Strathaven and District. To associate with national, local, voluntary,
corporate and charitable bodies and individuals. 
8.3. STMAHC has a 19-member management committee,15 regular volunteers. The
Historic Town Mill is a Category C listed building, one of the oldest in Strathaven
which plays a major role in community involvement within the town. 
8.4. The grant will allow STMAHC to restore the historical building frontage stonework
and roof repairs including lead works.   
96

Page 97

8.5. The project requires capital funding to make safe the building frontage and restore
on a like for like basis. The group have endeavoured to involve high end professional
stonemasons and lead workers. The restoration will involve the replacement of the
broken stonework and replace other elements that have been identified as requiring
maintenance. In addition, the roof requires some maintenance on leadwork and
slating. 
8.6. STMAHC Committee will manage the project overseeing all contractor works and
ensuring the building is restored on a like for like basis.  They will also ensure that
the necessary statutory approvals are in place for the works.   
8.7. The project has been identified within the Strathaven Community Action Plan. 
Strathaven Town Mill is a focal point within the village and hosts numerous
community events and activities. 
8.8. The application has been assessed and scored an average of 35 out of 53
supporting a grant award of up to £56,231.01 totalling 100% of eligible costs.
Strathaven is one of the villages where through changes made at the February 2024
Community and Enterprise Resources Committee 100% grants can be approved
where good projects have difficulty on securing match funding. 
8.9. The REF grant sought is 100% of the project value as set out below. 
Funder Stage Value
SLC Renewable Energy Fund Grant
(100%) Calder Water
For approval £56,231
Total project value   £56,231  
8.10. The project is scheduled to commence in May 2025 and be complete by August
2025. Officers will work with the applicant to monitor progress.   
9. Grant Recommendation
9.1. Application Number 1180 
Friends of Stonehouse Park – project value £52,840 
Proposed Grant award £49,840 intervention rate of 94% 
The proposed grant of £49,840 will be funded from Auchrobert windfarm which
contributes into the Renewable Energy Fund 
9.2. Friends of Stonehouse Park (FOSP) is a Charity with its purpose being: - 
To conserve, enhance and improve the landscape including the biodiversity of
the site through community-based events and activities and in partnership
with other groups within the community with shared interests. This includes
improving access to the site and encouraging great use of the park through
community engagement which in turn improves pride in citizenship. 
9.3. FOSP has a four-member management committee, 8 regular volunteers, and 27
members. 
9.4. The grant will allow FOSP to restore and refurbish the Alexander Hamilton Memorial
Fountain within Stonehouse Park which has fallen into disrepair. Erected for the
opening of the Park, the fountain is one of only two original historical structures in the
Park.
97

Page 98

9.5. The project requires capital funding to complete restoration works on Alexander
Hamilton Memorial Park Fountain, which will include the demolition and rebuilding of
an existing brick wall, slab base cleaned and repaired, renew wrought iron railings
painted to match bandstand colours, fountain repairs and cleaned, new plaque to be
added, path maintenance and repairs to path leading to the fountain.   
9.6. FOSP have been working with Council officers to ensure the project can be
completed in time to mark the centenary of Stonehouse Public Park opening in 1925.
The project will be managed by the Council’s Housing & Technical Resources. 
9.7. This project been established from FOSP Community Action Plan, to enhance the
infrastructure within the park to encourage heritage and recreation.  
9.8. The application has been assessed and scored an average of 35 out of 53
supporting a grant award of up to £49,840 totalling 94% of eligible costs. Stonehouse
is one of the villages where through changes made at the February 2024 Community
and Enterprise Resources Committee grants of up to 100% can be approved where
good projects have difficulty on securing match funding. 
9.9. All Renewable Energy Fund awards are subject to suitable match funding being
secured. The REF grant sought is 94% of the project value with the match funding as
set out below. 
Funder Stage Value
Shared Prosperity Fund  Confirmed £3,000
SLC Renewable Energy Fund Grant
(94%) Auchrobert 
For approval £49,840
Total project value   £52,840  
9.10. The project is scheduled to commence in March 2025 and be complete by May
2025. Officers will work with the applicant to monitor progress. 
10. Employee Implications
10.1. There are no employee implications arising from this report. 
11. Financial Implications
11.1. The finance from the awards will come from windfarms which contributes to the REF. 
The Funds have sufficient resources to meet the proposed grant award commitment
detailed in this report. 
11.2. REF funding awards are subject to all other funding being secured.   
12. Climate Change, Sustainability and Environmental Implications
12.1. The projects will support the Councils aims on climate change, sustainability and
reduction in carbon emissions and have positive impacts in the following ways: 
 The enhancement of walking routes around Coalburn will assist in active travel
and provide greater recreation resources to the village reducing carbon
emissions.
 The support of Healthy Valleys Gear Up project will support increased wheeling
and biking within communities with an aim to reduce carbon emissions. 
98

Page 99

 The completion of active paths between Poniel and Douglas will help support
active travel and reduce carbon emissions  
 The restoration and reinstatement of the stone frontage of the Strathaven Town
Mill will restore and maintain a heritage building contributing to sustainability of
assets in communities. 
 The restoration of the Stonehouse Park Fountain will restore and maintain an
existing feature contributing to sustainability of assets within communities.   
13. Other Implications
13.1. The risks associated with the projects are focused on the potential for cost overruns,
delays to the projects or match funding not being secured. Work will continue with
the applicants to help ensure match funding is secured and that projects are
delivered broadly on time and within budget. 
14. Integrated Impact Assessment and Consultation Arrangements
14.1. This report does not introduce a new policy, function or strategy and, therefore, no
impact assessment is required. 
14.2. The projects listed for approval will have a primarily positive effect on communities
and all individuals including those with protected characteristics. Several of the
projects are within areas of higher deprivation and will support cost effective active
travel options for those with lower socio economics opportunities.     
14.3. Community Consultation is a requirement for all REF grants.  Consultation can be
referenced through community action plans, independent consultation and social
media platforms.   
David Booth 
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Accountable, effective, efficient, and transparent 
Priorities
 We will work towards a sustainable future in sustainable places 
Outcomes
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible     
Previous References
• Community and Enterprise Resources Committee 6 Feb 2024 Renewable Energy
Fund - Strengthening Links to Rural Priorities. 
99

Page 100

List of Background Papers
 Completed REF Appraisal Scoring Sheet for application number 1138
 Completed REF Grant Application Form for application number 1138
 Completed REF Appraisal Scoring Sheet for application number 1195
 Completed REF Grant Application Form for application number 1195
 Completed REF Appraisal Scoring Sheet for application number 1171
 Completed REF Grant Application Form for application number 1171
 Completed REF Appraisal Scoring Sheet for application number 1192
 Completed REF Grant Application Form for application number 1192
 Completed REF Appraisal Scoring Sheet for application number 1091
 Completed REF Grant Application Form for application number 1091
 Completed REF Appraisal Scoring Sheet for application number 1180
 Completed REF Grant Application Form for application number 1180 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Colin McFarlane
Project Development Officer
Enterprise and Sustainable Development Services
E-mail: -  colin.mcfarlane@southlanarkshire.gov.uk 
100

Page 101

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Employability Performance Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee on the performance of the Council’s Employability Service,
South Lanarkshire Works
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the performance of the Employability Service be noted.
[1recs]
3. Background
3.1. South Lanarkshire Works, the Council’s Employability Service, delivers and funds a
range of programmes designed to develop the work readiness skills of people and
support them to progress to sustainable employment. 
3.2. The services can be broadly split into three categories:- 
 senior-phase work-based learning programmes which are delivered to school
pupils in S4 to S6 as part of their curriculum
 keyworker based employability support delivered to key priority groups
 learning/training and skills development provision which is delivered to meet the
needs of people engaging with keyworker services  
3.3. Case studies demonstrating the impact of the programme on individuals are included
at Appendix 1. 
4. Senior Phase Work-Based Learning
4.1. South Lanarkshire Works delivers a range of work-based learning programmes on
behalf of Education Resources. The programmes are delivered in partnership with
local colleges and are timetabled to form part of a pupil’s senior phase curriculum.
10
101

Page 102

4.2. Foundation Apprenticeships
4.2.1. Foundation Apprenticeships (FAs) are a national senior phase option, funded by
Skills Development Scotland (SDS) and the Scottish Funding Council (SFC) and are
designed to allow pupils in S5 to S6 gain valuable, real-world work experience and
access to work-based learning while they are at school. Pupils attend college and
work placements up to two days a week while at school and the qualification
achieved is delivered at Level 6 (equivalent to a Higher) of the Scottish Credit and
Qualifications Framework (SCQF). 
4.2.2. South Lanarkshire’s FA programme is delivered as a partnership between the
Council, South Lanarkshire College and New College Lanarkshire with the colleges
delivering the learning element and the Council managing the overall programme
including pupil support, compliance and work placements. 
4.2.3. During the 2023/2024 academic year, 70 young people completed Foundation
Apprenticeships with 68 achieving the qualification and all 70 progressing to a
positive post-school destination of employment or further learning. 
Table 1: South Lanarkshire FA Starts 2023/2024 
4.2.4. For the 2024/2025 academic year a similar number of places were available,
however, there has been a reduction in uptake from schools with 95 pupils starting
the programme in August 2024. 
Table 2: South Lanarkshire FA starts 2024/2025 
Framework
1 year
starts
2 year
starts
2nd year
returners Total
Accountancy  13  13
Business Skills 5 7  12
Creative and Digital Media  9 19 12 40
Children and Young People 18 30 15 63
Engineering   10  10
Healthcare 13 27 8 48
IT Software   13  13 
Total  45 119 35 199
Framework
1 year
starts
2 year
starts
2nd year
returners Total
Accountancy 0 0 6 6
Business Skills 5 0 4 9
Creative and Digital Media  12 13 18 43
Children and Young People 8 31 20 59
Engineering  0 0 9 9
Healthcare 10 16 13 39
IT Software  0 0 9 9 
Total  35 60 79 174
102

Page 103

4.3. GradU8
4.3.1. The GradU8 programme is a South Lanarkshire specific work-based learning option
available to pupils in S4 to S6. Delivery takes place in local colleges where pupils
attend one-day-per week to complete a vocational qualification at SCQF level 4 or 5. 
In 2024/25, pupils have been able to pick one of 12 subject areas, all designed to
offer progression in areas with employment progression opportunities. The
programme is delivered in partnership with South Lanarkshire College, New College
Lanarkshire and Glasgow Kelvin College. This partnership arrangement allows
colleges to make a financial contribution in the form of Scottish Funding Council
credits which pay for the learning and teaching element of the programme. Pupils are
supported in college by South Lanarkshire Works Vocational Development Workers
to engage effectively on the programme and to support transition planning for any
leavers following completion of the course.   
4.3.2. In addition to the college-based options each school can also identify up to 5 young
people to take part in a long-term work placement as part of the GradU8 programme.
Young people attend their placement one day a week on the school’s GradU8 day
and placements are sourced by the employability team across Council and partner
workplaces and with local employers. 
4.3.3. In 2023/2024, 924 places were available to young people across 12 subjects at
partner colleges South Lanarkshire College, New College Lanarkshire, and Glasgow
Kelvin College. 796 young people completed the programme and achieved
accredited qualifications. For the new 2024/2025 academic year, 766 pupils started
in August 2024. 
Table 3: GradU8 completers and starts by subject 
GradU8 subject 2023/24 
completers
2024/25 
starts
Beauty 66 74
Childcare 66 92
Construction 166 142
Creative & Digital 34 46
Engineering 89 61
Hair & Barbering 65 79
Healthcare 58 48
Horticulture - 9
Hospitality 37 54
Make-up Artistry 61 60
Personal and Social Development  40 -
Sport & Recreation 49 44
Uniformed Services 65 57
Work Experience  28 27
Total 824 793 
103

Page 104

5. Keyworker-based Employability Services
5.1. The keyworker-based employability services delivered and funded by South
Lanarkshire Works are designed to meet the needs of Key Priority Groups
experiencing barriers to employment, by providing one-to-one support. All
participants are supported by a named keyworker who supports them to develop and
complete an individualised action plan, which includes access to a range of training
and employability provision. 
5.2. The keyworker-based services are predominantly funded externally from the Scottish
Government’s No-one Left Behind funding and UK Government Shared Prosperity
Fund. These services, along with the learning and training provision, set out at
section 6. are agreed with the South Lanarkshire Local Employability Partnership
(SLLEP) and set out in an Annual Investment Plan (AIP) which is returned to Scottish
Government. 
5.3. All programmes are delivered in line with the Scottish Government’s Scottish
Approach to Employability which includes:- 
 dignity and respect, fairness equality and continuous improvement
 provides flexible and person-centred support
 is straightforward for people to navigate
 integrated and aligned with other services
 provides pathways into sustainable and fair work
 driven by evidence including data and the experience of users
 support more people to move into the right job at the right time 
Table 4: Key Priority Groups and Services 
Key priority group  Keyworker Service  Delivery Partner
Young people in the last
6 months of school 
Aspire SLC
Young people aged 16-19  AspireWorks SLC
Adults with barriers to
employment 
Gateway to Employment Routes to Work South
People with long term
health barriers
Gateway (Intensive) Routes to Work South
People with learning
disabilities 
Supported Employment SLC
Parents from the
following groups: 
 Lone parents
 Parents or children
with a disability
 Parents with 3 or
more children
 Parents from a
minority ethnic
background 
Supporting Families 
Aim to Achieve / Upskilling 
Making it Work 
SLC
SLC
Routes to Work South
104

Page 105

 Parents with a
youngest child
under 1
 Families with a
parent under 25
years 
6. Employability Learning and Training Provision
6.1. All participants engaging on a keyworker-based programme have access to a range
of provision. This provision may include activity funded by the South Lanarkshire
Works including activity delivered by keyworker services and training or learning
activity delivered on a procured basis by local partners. Provision can also include
health and wellbeing supports, training allowances and access to waged training
programmes. 
6.2. The SLLEP’s operational sub-group meets regularly to identify emerging needs and
agree provision to be funded as part of the Annual Investment Plan. In 2024/2025
provision has included:-   
Table 5: Employability Learning and Training Provision 2024/2025
Programme Description  Provider
Volunteering for
Employability
VASLAN programme matches
employability participants to
volunteering opportunities with
local third sector organisations 
VASLAN
Rural Academy  Training and learning opportunities
based in Clydesdale delivered by
South Lanarkshire College   
South Lanarkshire
College 
Rise, Reach and
Impact
Employability groupwork
programmes targeted at young
people engaging with Aspire and
AspireWorks
Routes to Work South
Winter / summer
leaver
programmes
College based learning to support
young people in their last 6 months
of school 
South Lanarkshire
College
New College
Lanarkshire
QTS Rail
Academy 
Rail sector-based training
programme linked to the East
Kilbride Enhancements Project 
QTS / Routes to Work
South
Hospitality
Academy
Hospitality training programme
delivered in partnership with
Macdonald Crutherland Hotel 
Skills Training Network
Vocational tasters
/ sector training
Procured programmes to support
participants to complete
introductory training in sectors on a
demand-led basis. Provision has
included construction, hair and
barbering and social care, HGV 
Various procured
providers 
Routes to Work South
105

Page 106

Work tasters and
placements
Employability participants can
access work placements as part of
their action plan and training
allowances of £25 per day are
available to support engagement 
SLC / Local employers 
Project Search This programme supports young
people with learning disabilities to
take part in a programme of work
placements, employability support
and training delivered at University
Hospital Hairmyres in partnership
with NHS Lanarkshire and New
College Lanarkshire and ISS 
SLC / Project Search 
NHS and SLC
Demonstrator
The programme provides 6 month
waged part-time work placements
to parental employability
participants. Placements are based
within NHS Lanarkshire, SLC
facilities services, ISS and the State
Hospital Carstairs 
SLC / NHS Lanarkshire
and ISS
Employer
Recruitment
Incentives
Funding is available to support
SMEs creating additional Fair Work
vacancies to support employability
participants into employment
SLC   
6.3. Connect2Renewables Employability Initiative provides enhanced support to
complement the range of programmes offered.  OnPath Energy provides the
Community Benefit funding for Connect2Renewables and is available to participants
that reside 10km from either Kype Muir Windfarm in Strathaven or Middle Muir
Windfarm in Crawfordjohn.  Support provided includes Employer Recruitment
Incentives, Into Work Grants, Further Education Grants and Training.  385
participants (121 Middle Muir and 264 Kype Muir) have been supported by the fund
in 2023/2024. 
7. Programme Performance
7.1. In 2023/2024 the Council’s employability programmes supported 2,257 people from
the key priority groups identified above. 834 people progressed to further education
or training including participants undertaking certified learning as part of their
engagement with the Gateway to Employment Programme. A total of 579 people
progressed to employment during the year.
106

Page 107

7.2. In 2024/2025, 1,169 people have registered with employability services up to the end
of August 2024 with 355 accessing or progressing to education or training and 306
moving into employment.   
Table 6: Employability performance by Key Priority Group 2023/2024 
Registrations
Participants
accessing /
progressing
to further
training /
education
Progressions to
employment 
Young people in last 6
months of school 503
191 46
Young people age 16-19 283 93 95
Adults with barriers to
employment 933
384 334
People with learning
disabilities 139
9 8
Parents 399 157 96
Total 2257 834 579 
Table 7: Employability performance by Key Priority Group 1st April  – 31st
August 2024 
Registrations 
Participants
accessing /
progressing to
further training
/ education 
Progressions
to employment 
Young people in last 6
months of school 398  197  19
Young people age 16-19 108 38 23
Adults with barriers to
employment 292
69 175
People with long term
health barriers* 175
3 25
People with learning
disabilities 29
8 10
Parents 167 40 54
Total 1169 355 306 
*services have been delivered to people with long term health barriers as a key
priority group since April 2024 
107

Page 108

8. School Leaver Destinations and Post-School Tracking 
8.1. A key focus and performance measure of the employability service is to improve the
proportion of school leavers that progress to a positive destination of education
training or employment. The service works closely with all secondary schools and
Skills Development Scotland to identify those young people most at risk of becoming
unemployed when they leave school and tracking their post-school destinations. 
8.2. The most recent School Leaver Destination Report (SLDR) showed that 96.9% of
those pupils who left school in academic year 2022/2023 entered a positive
destination. This was a slight improvement from the previous year and above the
Scottish rate for the 8th year in a row and placed South Lanarkshire 6th highest of the
Scottish local authorities. The AspireWorks keyworker employment service set out
above at paragraph 5.3 is counted as a positive destination for SLDR purposes and
recorded under ‘training’. 
Table 8: Positive School Leaver Destinations 2018/2019 – 2022/2023
Year
Positive destination
rate (South
Lanarkshire) 
Positive destination
rate (Scotland)
2022/23 96.9% 95.9%
2021/22 96.2% 95.7%
2020/21 96.2% 95.5%
2019/20 94.8% 93.3%
2018/19 95.7% 95.0% 
Table 9: Destination breakdown 2022/2023 
Destination   South Lanarkshire   Scotland
Employment 21.2% 24.3%
Higher Education 45.9% 40.3%
Further Education 25.7% 26.6%
Training 3.7% 3.4%
Personal Skills
Development 0.2% 0.5%
Voluntary Work 0.2% 0.5%
Unemployed seeking 1.5% 1.3%
Unemployed not seeking 1.3% 1.6%
Unknown 0.4% 0.3%  
9. Participation Measure and Post-school Tracking
9.1. Since 2016, Skills Development Scotland have published the Annual Participation
Measure (APM) which reports on the economic and employment activity of 16–19
year-olds in Scotland and is the source of the Scottish Government’s National
Performance indicator “Percentage of young adults (16-19 year olds) participating in
education, training or employment’. This measure has a wider focus than the school
leaver destination and includes young people who are at school, in college, at
university, at work or participating in employability support. The most recent report
was published in August 2024 and showed 93.8% of young people aged 16-19 in
South Lanarkshire were participating, this was higher than the Scottish rate of 92.7%
and an increase from the previous year.
108

Page 109

Table 10: Participation Measure 2019-2024
Year   South Lanarkshire  Scotland  
2024 93.8% 92.7%
2023 93.3% 92.6%
2022 92.3% 92.4%
2021 92.8% 92.2%
2020 92.7% 92.1%
2019 92.6% 91.6% 
9.2. Since 2022, the Employability Service has led a process of joint tracking between the
Council and Skills Development Scotland to improve the participation measure by
identifying young people, including through home visits, with an unconfirmed or
unemployed status and offering appropriate support or confirming destinations.
During this period the service has carried out almost 1,300 home visits. A detailed
breakdown of the visits carried out between August 2023 and July 2024 is provided
below. 
Table: Participation Measure tracking August 2023 – August 2024  
Aug-
23
Nov-
23
Feb-
24
Apr-
24
Jul-
24 Total
Total Home Visits 122 69 112 121 188 612
Found and referred for
employability support 22 18 30 23 40 133
Found – declined / not ready
for support 7 7 9 8 26 57
Found – confirmed to be in a
destination 32 5 11 42 42 132
Found, linking in with DWP 5 0 2 3 0 10
Unable to make contact /
changed address 55 39 60 45 80 279 
10. Labour Market Information 
10.1. The Council produces regular Labour Market Information (LMI) reports for the South
Lanarkshire Employability Partnership to support the planning of employability
services. 
10.2. Claimant count, which refers to all unemployed people (aged 16-64) in receipt of out
of work benefits (Universal Credit and Job Seekers Allowance) has broadly fallen in
recent years since a Covid period high point of 6.8% in August 2020 and stood at
3.2% as of August 2024. This compares to 3.4% for Scotland and 4.3% across the
UK. While the rate has remained steady over recent months, the total claimant
number has increased for each of the past 3 months and stands at 6,525, an
increase of almost 300 people in a year. 
109

Page 110

10.3. Although unemployment is low by historical standards, a significant number of
people are economically inactive which means they are out of work and not actively
looking for work. The rate of economic inactivity in South Lanarkshire was 21.3% in
March 2024 and has been rising since March 2023 when the rate was 16.7%.
Although the rate is slightly below the Scottish rate (22.9%), there have been four
consecutive quarterly increases in economic inactivity and the current rate is the
highest recorded since the middle of the first COVID pandemic (June 2020). 
10.4. Within this group, which also includes people who have retired before the age of 64
and students, there is a significant group of people who are not working due to ill
health. In March, this was more than 30% of the cohort, around 14,000 people in
South Lanarkshire. 
11. Employee Implications
11.1. There are no employee implications in terms of the information contained within this
report. 
12. Financial Implications
12.1. There are no financial implications in terms of the information contained within this
report. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained within this report. 
14. Other Implications
14.1. The are no other implications arising from this report. 
15. Integrated Impact Assessment and Consultation Arrangements
15.1. Integrated Impact Assessments will be undertaken for any new programmes. 
15.2. There is ongoing consultation with stakeholders and partners to ensure the
employability programmes meet the needs of residents within South Lanarkshire.   
David Booth
Executive Director ( Community and Enterprise Resources) 
5 November 2024 
110

Page 111

Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
 We will work to put people first and reduce inequality
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Thriving business, fair jobs and vibrant town centres
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Douglas Hashagen – Employability Manager 
Tel;  0141 584 2915 
Email; Douglas.Hashagen@southlanarkshire.gov.uk
111

Page 112

Appendix 1 
Employability Case Studies 
Robbie
Robbie was referred to take part in the REACH programme in Lanark.  He faced challenges
with mental health, tourettes, and autism.  Robbie’s goal was to go into employment rather
than further education.   During his time on the programme, we focussed on personal
development and confidence-building.   Initially quiet, Robbie gradually blossomed,
engaging in activities, sharing ideas, and participating in employer visits and team-building
exercises. 
His dedication led to a work experience placement at Pets at Home. Within just two weeks,
Robbie impressed the team so much that they offered him an interview, resulting in part-
time employment. 
Robbie “The Reach programme really boosted my confidence and gave me the chance to
work hard for what I wanted.” 
Sonia
Sonia was referred to the Making it Work parental employability programme by DWP.    She
had been unemployed for 5 years and was on universal credit.  Sonia is a lone parent with
2 children approaching nursery age. 
Sonia had a real interest in becoming an HGV driver. She felt that this would give her
independence, and she would be able to provide for her children and hopefully get
something that would work around her childcare.   Sonia and her keyworker researched
HGV training organisations, selected a training course and through the MIW programme
funding was provided for Sonia to complete the course.  Sonia also participated in CV
building and job search sessions to understand how to effectively look for work and the
different ways to successfully secure employment and attended interview skills course in
preparation for any future interviews.   
Following completion of the course Sonia was supported intensively to help source
employment.   After a short period of time, she obtained employment as an HGV Class 2
Driver, working full time in the evenings which fits around her childcare. Sonia is loving the
position, feels proud of herself for achieving her dream and supporting her family. She loves
the independence, having a purpose out with being a parent and her children are feeling
the benefits financially with her being in work. 
AK
AK was referred to Making It Work for Parents programme in early February by her job
coach at DWP.  AK had fled the war in Ukraine to come to live in the UK   and is a lone
parent to school age twin daughters one of whom has cystic fibrosis.  AK’s barriers centred
around her having to move to a new country, feeling isolated, language, childcare and
finding suitable hours for employment. AK’s hopes and aspirations were to become less
isolated, gain some work experience, improve her English and ultimately enter paid
employment.   
In the initial appointments we set out a journey plan for AK and had a long discussion to
identify her transferable skills and any gaps she felt she needed addressed going forward.
A referral to Money Matters was also made to ensure AK was receiving the correct level of
benefits and not missing out on any other financial support available to her. One-to-one
112

Page 113

sessions took place weekly where we could begin to address her employability skills, work
on her CV and cover letters, explore effective job searching and jobsite registration,
application form support and interview preparation. 
AK took up 2 volunteering placements to help with her isolation, she attended these when
her children were at school.  One was in a charity shop and the other within a local church
café.   Both these roles provided her with a social network as well as adding to her work
experience in the UK and her employability skills.   AK also secured a slot in an ESOL class
to improve her English skills.     
On completion of the programme AK moved into paid employment in Housekeeping in a
local hotel close to her home. This role is ideal for AK as the hours suit her childcare needs
and she will now be better off as her weekly wage supplements her existing benefits 
Sean
Sean was referred to the Supported Employment service by DWP.  Sean was looking for
employment however wasn’t sure where to begin.  He met with a key worker who
completed a detailed assessment of his barriers, goals and aims.  Sean started Project
EmployAbility, an initiative that focussed on building confidence, teamwork and
communication skills through practical activities in Hillhouse Workshops followed by
supported work experience at a local golf course. 
Sean flourished during his time on the programme, reporting that he felt his confidence
improved and that he was ready to progress to the world of work. 
Sean’s next step was to apply for DFN Project Search where he was interviewed for the
programme by the Account Director at ISS Hairmyers however he so impressed that rather
than start with the programme he offered Sean an immediate work trial within University
Hospital Hairmyres.  Sean completed his trial to great feedback and reviews from the ISS
team and was offered a part time contract with them as a porter which he was delighted to
accept. 
John
John joined Project Search following completion of a Life Skills college course.  Project
Search is a 9-month programme designed for autistic adults to gain valuable real life work
experience in a hospital setting coupled with employability skill.  Participants complete 3
work placements in various departments within the hospital including portering,
housekeeping, stores, medical records and labs.  Each individual is supported by a
dedicated job coach who is available to simplify tasks or work alongside participants until
they feel more comfortable to work independently. 
John received fantastic feedback from his placements and upon completion of the
programme, was offered a part time position with ISS as a catering assistant. 
John’s manager said that both Sean and John are excellent additions to his workforce. 
They have fitted into the existing teams well and are both performing to a high standard.  
Eve
Eve was referred to the Supported Employment team and as part of her plan, took part in a
Hospitality Academy programme funded by the council and delivered in partnership with
MacDonald Crutherland Hotel in East Kilbride.  Over the 12 weeks she attended and
engaged really well, her confidence grew, and she showed a real passion for working in the
hospitality industry. On completion of the programme Eve secured employment with the
113

Page 114

hotel.   Eve was supported throughout her 12 weeks by her Key Worker Jade.  Jade says
that Eve has done extremely well – she has grown in confidence and is flourishing! 
Joshua 
Joshua is a parent of two children. Joshua was employed as a drainage engineer on a low
income, however due to lack of qualifications and training there was no progression for
Joshua who was looking for opportunities to enhance his career. He got in touch with South
Lanarkshire Council’s Employability team and was referred to the Upskilling team for
support. 
When meeting with Joshua it was identified that there could be the potential to increase his
earnings with his current workplace by completing an HGV driving qualification. It was
agreed with his manager that on completion of this training Joshua would be offered a
promotion. With the support from the Upskilling team Joshua secured a funded place with a
training provider to do his HGV driver training and tests. Joshua was delighted with this
offer as he was not in a position for fund this himself. 
During the training period Joshua successfully applied for a post as a drainage technician
with a different company at a higher rate of pay. Joshua has now completed his training and
successfully passed his and is fully qualified to drive heavy goods vehicles. This will make a
huge difference for Joshua’s career opportunities. Joshua’s employer has agreed to a
further increase in salary which will improve his financial position and his wellbeing not only
for himself but for his young family. 
“The support from South Lanarkshire Works has given me freedom to secure a position
within a thriving business and allow me to undertake training that not only will give me an
extra qualification but allow me to progress and give my family and I more financial
freedom. It has been a real stress-free experience. The team spoke to me through all the
steps and reassured me with any questions I had. I would not be in the position I am
without their support which I cannot thank them enough.” 
Oden
Oden who is 17, was referred to the AspireWorks programme by Skills Development
Scotland.   He had previously been in employment within an Iron Foundry but had not
sustained this due to personal issues and mental health.     
Following initial assessment, it was clear that Oden wasn’t sure what line of work he would
like to do, we looked at his strengths and the transferable skills he had gained previously
when he was in employment.   The assessment also highlighted that Oden needed support
to help develop his confidence and around ways of improving his mental health. Oden’s
action plan included applying for his Young Scot travel card, developing his knowledge of
job searching and applying for jobs, interview techniques and employer expectations.   He
was also referred to the Council’s counselling service to help with his mental health.   
During his time on the programme Oden and his family became homeless due to their
house flooding, they were placed in temporary accommodation, but this didn't stop Oden
engaging with his key worker.  His mum played a part in this ensuring he was attending his
appointments and engaging. Over time Oden’s confidence began to grow and he
developed a positive working relationship with his key worker. We then agreed to look for a
work experience placement and secured a 6-week placement with a local employer in
Rutherglen manufacturing doors and windows for the construction industry 
At the same time, we arranged for Oden to complete his CSCS card which he passed first
time.   The employers were delighted with Oden’s commitment and attitude to learning new
114

Page 115

skills, his time keeping and attendance and listening to experienced staff. The employer
offered Oden full time employment which he accepted and has maintained employment
since.  Oden has benefitted greatly from the AspireWorks support, he has become much
more positive and optimistic about his employment prospects and is doing really well in his
job.   
Brandon
Brandon was referred to AspireWorks by his school.  He had just completed S6 but needed
some extra support to move into a positive destination.     
Brandon was a very quiet, shy young man and found it hard to form friendships throughout
school, this was evident when he joined Aspire Works.  Brandon also suffered from low self-
esteem and really didn’t know what he wanted to do with his future. We discussed building
his confidence and introducing him to group work. Brandon was supported with weekly
meetings to enable him to build a relationship with his key worker and  
work on his own personal development. As the relationship developed Brandom became
increasingly was motivated and agreed to take part in the RISE groupwork programmes,
delivered by Routes to Work South where he excelled with 100% attendance.   The
programme included CV preparation, interview skills, sector awareness, mock interviews,
confidence building projects and SVQ Qualifications in First Aid, Food Hygiene and Fire
Marshalling. 
In addition to the RISE programme Brandon’s key worker supported him to find work
experience at the Cameronian Museum in Hamilton and he started this in November 23,
one day per week.   Brandon was giving a training allowance as part of this plan.   
Brandon was also supported into looking at different college courses and also helping him
to apply for them.  He decided he would like to study Criminology and successful gained a
place studying Criminology and Pathology at New College Lanarkshire.   When he started
this, he still continued to take part in his work experience as this has helped his confidence.     
Brandon’s confidence has grown immensely, he feels confident he will finish the current
college course and apply for another course in August. 
“The support I received was extremely helpful in my growth as a person as I am now more
social and have more confidence in my abilities which helps me to apply my skills to further
education and to the work experience, I received as a result of attending AspireWorks, I
continue to volunteer at The Cameronian Museum in Hamilton.  I would certainly
recommend AspireWorks to any young adults looking to find a purpose in their life as I have
overcome so many barriers” 
Ainslie
Ainslie was referred to the Supporting Families programme by Westburn Nursery. Ainslie
was unemployed and the main aim was to help her find a job and to assist with debt
management.   Ainslie was experiencing a number of barriers to employment including a
lack of confidence and self-belief, struggles with her mental health and challenges around
money management. 
During our initial meeting, Ainslie revealed that she would love to train to be a nurse. She
had looked at college courses but was unsure about writing and submitting an application,
as she had left school with no formal qualifications.  The recent time she had spent caring
for her grandmother and helping in a care home had motivated Ainslie into looking at this
type of career path. 
115

Page 116

Following initial assessment, we drew up an action plan that set out the supports and
activities we would put in place to help Ainslie.   I referred Ainslie to One Parent Families to
complete a benefits check and to support with her money management. They also
supported Ainslie to applied for funding for a new fridge freezer. 
Ainslie was invited along to attend the Health Walks I was leading at Westburn Nursery to
improve her mental health and a referral was made to Rain or Shine to access clothing for
her son.  I spent a few weeks getting to know Ainslie before asking her how she felt about
applying for college to do a SWAP Nursing course. These courses are designed for people
who have no or few formal qualifications and have been out of education for three to five
years. Ainslie was keen to apply, and we sat down together to complete the application
drawing on her personal qualities and her experiences caring for her grandmother and
previous experience working in a care home for the elderly. 
Ainslie was invited to attend an interview at Glasgow Clyde College Langside Campus and
the following day Ainslie received an unconditional offer. She was absolutely elated and
can’t quite believe she is going to college.   
"You've made me more confident, you've helped me believe in myself a lot more, you’re
very kind and patient and very understanding towards my ADHD, you've been there through
a good few challenges regarding my grandma always been really good to talk to and feel so
comfortable approaching you with anything, you’re just amazing Hazel you've helped me so
much you've came into my life and changed it up. You've stuck by my side, and we clicked
right away. Can't thank you enough and really appreciate you". 
Nzube
Nzube, who is a parent was with two children, one of whom is disabled was referred to
Routes to Work South by Jobcentre Plus as he was unemployed and seeking employment
opportunities. 
As Nzube required a job which would allow him to help his wife care for both children out
with school hours, Routes to Work South worked with Nzube to apply for the NHS
Demonstrator Programme as the programme is designed to fit around participant’s
childcare needs. Nzube had previously worked as a nurse overseas but wanted to move
into an admin role following a previous personal experience. Nzube was offered a 6-month
waged position on programme he as an Admin Officer with hours which suited his childcare
needs. His initial placement was in an ICU setting however Nzube found this challenging
due to a previous personal experience. The NHS Employability team and NHS
Management were very supportive in working to relocate him to a more suitable location.
Nzube has commented that the supportive environment has improved his health. 
During his time on the programme Nzube’s was supported to update his CV and carry out
job searches to help him find suitable employment. Following the 6-month programme
Nzube secured work covering admin bank shifts which he can select to suit his family
requirements. He now earns a monthly salary to suit his circumstances. 
“I used to be a nurse when I lived in Ukraine and wanted to move into an admin role. By
doing the Demonstrator Programme, I have gained skills within the Workforce team such as
IT skills, learning how to use Allocate programme and Trakcare. The opportunity to train
and develop myself has been very beneficial. My health has improved as it is a supportive
environment, and everyone is very helpful”
116

Page 117

Olivia
When Olivia was referred to Aspire by her school she had disengaged from education and
was becoming involved in anti-social behaviour and alcohol use in the community. The
school had attempted to support Olivia through counselling support which she had not
engaged with and initial attempts to contact her by the keyworker were unsuccessful with
repeated attempts made through phone calls and home visits. However once Olivia began
to engage she developed a positive relationship with her key worker and they began to
develop a plan together. 
Olivia had a clear goal to move into employment rather than attend college and identified
early years as her goal. Olivia secured a part-time job in a café, and we continued to work
together to find her a placements in a nursery. Following this she used her placement
experience to secure a modern apprenticeship in a local nursery where she continues to
work. 
Sarah May
Sarah May was referred to Aspire for one-to-one support by her pupil support teacher as
she wasn’t attending and had disengaged from school. On meeting Sarah May she advised
that she lacked motivation and was not open to exploring college courses as she thought it
would be the same school. Through one-to-one meetings we discussed careers pathways,
began to work on her CV and registered Sarah May with job search websites, Planit Plus
and My World of Work. I also supported Sarah May to keep an open growth mindset about
going onto further education, we watched some videos from Winning Scotland to help her
understand more about growth/fixed mindset. After a few weeks she became open to the
idea of college and we had a look at some of the courses available locally. 
As I got to know Sarah May she would often talk about her holidays with her family and how
she loved to travel. Using the techniques I had learned through growth mindset training I
hoped to empower her to believe she had the necessary skills and encouraged her to
consider the travel and tourism crew course at South Lanarkshire College. We had a look at
the course content and arranged a visit to the college where Sarah May was especially
impressed with the classroom that is designed like an aeroplane. Sarah May decided to
apply for the course and I supported her with the application form. 
Sarah May worked really well with me and used Aspire support to the best of her advantage
by attending the meetings I had arranged and keeping in contact with regular updates. The
change in her attitude and eagerness to work made my job a lot easier. Sarah May is a
lovely girl, I wish her every success and have no doubts she will have a bright future ahead
of her. 
Demi 
Demi applied for the 2-year Foundation Apprenticeship in Social Services and Healthcare. 
Demi had experienced mental health issues and was attending Hamilton support base,
which supports students with social and emotional needs.  Demi was very quiet in class and
did not interact with any of the other students. 
By the end of year 1 Demi was beginning to interact with other students on the course and
as the course progressed into year 2 Demi’s confidence began to grow.  Demi was on
placement for 3 months in a care home and took part in a few activities with the service
users, spending time chatting about her life.  After a few weeks she was comfortable to act
of her own accord, offering service users support and reassurance.  Demi’s second
placement from January to April was in Hairmyres Hospital Outpatient Department.  She
interacted with patients, asking questions and taking details where required.  Demi acted in
117

Page 118

a professional manner with patients and staff.  By the end of the programme the change in
Demi was marked.  She was now confident in the skills she had gained on placement and
was now meeting socially with her peers and interacting unprompted with her lecturer and
FA team. 
Demi successfully achieved her FA in May and by the end of the programme the change in
Demi was marked.  She was now confident in the skills she had gained on placement and
was now meeting socially with her peers and interacting unprompted with her lecturer and
FA team. 
Rebecca
Rebecca applied for the 2-year Foundation Apprenticeship in Social Services Children and
Young People in 2022.  After a few months it became apparent that Rebecca’s health was
having a huge impact on her FA and school attendance, The Council’s FA worker met with
Rebecca and her pupil support teacher to discuss a plan to help Rebecca achieve the
qualification as she was sure her future career was in childcare. 
It was agreed that a plan be put in place that involved Rebecca leaving the 2 year
programme allowing her to concentrate on her health and school subjects and that she
would then apply for the 1 year FA programme in sixth year. The plan was followed, and
Rebecca achieved her FA in May 2024. Rebecca’s Her work placement was at Kilbryde
Early Learning Centre and she received fabulous feedback. 
Rebecca engaged well with her lecturers, work placement and the FA team keeping them
updated on any time off required and followed any remediation plans well. Rebecca
achieved her goal of attaining her FA in Social Services Children and Young People and
has secured a Modern Apprenticeship with Happy Days Nursery. 
Carly
Former Lesmahagow High School Pupil Carly was supported to progress to employment
with support from the Connect 2 Renewables programme. The OnPath Energy funding
supported Carly to take part in pre-employment training and provided financial support
through an employer recruitment incentive to support her into work. Carly a plant operative
is now part of the ‘women in plant’ working group where she encourages other females into
the industry by going along to speak to them about her experiences at schools and
colleges.
Rosanne 
Rosanne had been out of employment for a year and had a difficult time finding
employment in her dream Job as a Kitchen Porter. Rosanne engaged with the Making it
Work for Parents programme, where her advisor worked with her to build her confidence
before updating her CV to give her the best chance of employment success. Roseanne
participated in group training including an interview skills workshop and she was matched
with several vacancies before successfully gaining an interview and securing her dream job.
Rosanne struggled at the beginning of her new job with some aspects of the role and
wanted to leave, thankfully due to the relationship that had been developed with her advisor
we were able to meet with Roseanne to support her to combat her anxiety in the work place
and help her with her transition to work. Rosanne took all the advice and support offered to
her and 6 months into her new job she was given a promotion.  
118

Page 119

Daniel 
Daniel came to RTWS with the goal of securing his first job. Despite having some
volunteering experience helping the local youth football team, he struggled to recognise the
wide range of skills he possessed and lacked confidence in himself. Daniel needed
assistance with creating a CV and cover letter. We worked with Daniel to tailor his CV,
highlighting his personality and strengths. He also received ongoing support at the job club,
where we tasked him with approaching one of the employers for the upcoming Jobs Fair
and provided guidance on what to say. Daniel was introduced to a pharmaceutical
employer, and with his newfound confidence from the personalised support, he made a
strong impression. This led to an interview invitation. We reviewed the job specification in
detail and conducted a mock interview to help him prepare. As a result, Daniel's confidence
and professionalism shone through, which ultimately led to him being offered the position of
trainee dispenser. The employer expressed excitement about bringing Daniel on board and
noted that his potential and eagerness made him a standout candidate for the role. 
Cahal 
Prior to joining RTWS, Cahal had been grappling with anxiety and a lack of confidence,
compounded by his disability and a sense of being unsupported during his time at college,
which eventually led to him dropping out. Unsure of his next steps, Cahal sought guidance
to help him regain direction and rebuild his confidence. During his initial appointment, we
recognised Cahal's interest in data, statistics, and computing. We identified an 11-week
data analyst course, and Cahal was assisted throughout the application process, providing
support during Teams calls and offering reassurance. Out of 1,500 applicants, Cahal
successfully secured a spot on the course. To ensure Cahal feels supported and to prevent
a repeat of his negative college experience, we have coordinated ongoing support through
his RTWS advisor and Generation's wellbeing team which has led to Cahal's ongoing
attendance and participation. 
119

Page 120

120

Page 121

Agenda Item 
Report  
To:   Community and Enterprise Resources Committee
Date:   26 November 2024
Prepared by:   Executive Director (Community and Enterprise
Resources)    
Subject:   National Business District (NBD) Shawfield Update 
1.  Purpose of Report
1.1.  The purpose of the report is to:- 
 provide an update, in respect of National Business District (NBD) Shawfield
Phase 1 and 2 projects which are being supported by a variety of funding
sources, including Council funding of £800,000, resulting in a programme of
works totalling £29.1m 
2.  Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that progress made in respect of the NBD Shawfield projects, which are being
supported by a variety of funding sources, including Council funding of £800,000,
resulting in a programme of works totaling £29.1m, be noted;
(2) that the positive progress made by Clyde Gateway Urban Regeneration
Company (CG) in relation to the delivery of the NDB Shawfield Phase 2 projects,
which are funded by £14.7m of UK Government (UKG) funding and a total
combined value of £20.7m, be note; and
(3) to note that the Shawfield Project Delivery Board (SPDB) will act as the primary
form of governance for all NBD Shawfield projects and provide visibility and
accountability to the Council and UKG along with other funders and stakeholders
on all concurrent projects and activities within Shawfield, currently around seven
in total, as required by UKG funding conditions. 
3.  Background
3.1. CG’s Outline Business Case, finalised in January 2024 (OBC), developed the
Strategic Case and Economic Impact for the Shawfield completion programme. The
focus is to address environmental harm and blight within Shawfield; prevent adverse
health impacts and provide an acceptable target date for addressing the wider
damage caused to watercourses and marine coastal environments from the
Chromium contamination whilst leveraging additional economic benefits.
11
121

Page 122

3.2. To date CG has delivered £60m of remediation, infrastructure, and development
investment at NBD Shawfield. The overall cost of the current NBD Shawfield
programme of works either committed or underway is £29.1m, with £23.3m of match
funding secured against a Council contribution of £800k, and c£5m CG contribution. 
3.3. Table One sets out the budgets for each of the committed or projects underway, with
the associated UKG and other funding. 
Table One
Projects Funding Source Total
Funding
Committed
SLC UK
Gov
SG EQR SG
VDLIP
Scottish
Enterprise
SG –
RCGF
SG –
UKSPF
Clyde
Gateway
Funding (Committed and
Underway)         
Remediation of Phase 2 (241
Glasgow Road)   9.5  1  0.2      10.7
Shawfield GRID CAMPUS  2.9   1.2 3.4  1.2 8.7
Polmadie Burn Works  2.3       2.3
Acquisitions (Glasgow Road)   1.3      1.3
Riverbank Stabilisation   1.3    0.12 3.68 5.1
Biodiversity Action Plan   
0.2       0.2
Shawfield Gateway Road
(Design Fees)  0.8         0.8
Total 0.8 14.7 3.8 0.2 1.2 3.4 0.12 4.88 29.1 
3.4. In May 2024, a UKG Project Inception meeting took place between DLUHC, the
Council and CG to discuss the mechanisms and monitoring arrangements associated
with UKG funding. At that time, it was agreed that the UKG DLUHC was committed to
releasing £2,838,650 of LUF funding based on CG’s validation submission in
February 2024. This confirmation enabled CG to award both the Grid Campus and
Remediation Product Testing Contract. 
3.5. This initial payment was released to the Council, however, the Memorandum of
Understanding (MOU) was unable to be concluded with UKG as was the back-to-back
agreement with CG due to UK Parliamentary elections and then a decision that final
confirmation was on hold pending the UK elections.  As part of the Budget statement
on 30 November this funding has now been confirmed and officers are working to
conclude the MOU as a matter of urgency. 
3.6. In June 2024, an award of £3.8m was secured by CG from the Scottish Government’s
(SG) Environmental Quality & Resilience (EQR) department which promotes nature
restoration in respect of the ongoing remediation, biodiversity and land quality
improvements being undertaken in Shawfield. 
4. UKG Project Updates
4.1. Project Component 1: Shawfield Phase 2 Remediation
The development of a full remediation strategy for Shawfield Phase 2 is being
determined by an initial phase of Product Testing works which allows for the
remediation strategy to be developed. The total budget is £9,657,141.
122

Page 123

Project Component 2: Shawfield Grid Campus Plots A and B
4.2. The Grid Campus project comprises the development of two new industrial units
(2,700m2 / 29,000ft2) aimed at attracting High Value Manufacturing (HVM) jobs and
investment to the area following a 50-week construction programme. The total budget
for this is £8,753,625. 
Project Update
4.3. Contractor Heron Bro’s commenced the on-site works in June 2024 and have made
significant progress. Foundations are complete and steel frame packages are
underway. The works are currently on programme and scheduled to complete late-
May 2025. Terms have been issued for unit 1 to a high value manufacturing company.   
Project Component 3: Polmadie Burn
4.4. The final design solution is dependent on an ongoing extended feasibility study
currently taking place within the twin culverts (which feed into the burn).  The total
budget for this project is £2,300,000. 
Project Update
4.5. The original 11 Remedial Options have now been refined into three concise project
components. Meetings are taking place with the design team and stakeholders to
determine which components can be delivered within the constraints (timescale and
budget) posed by the UKG. 
5.  Employee Implications
5.1. Enterprise and Sustainable Development Service works closely with CG to monitor
activity, programmes and funding.    
6.  Financial Implications
6.1.  The overall cost of the current NBD Shawfield programme of works either committed
or underway is £29.1m, with £23.3 m of match funding secured against a Council
contribution of £800k, and a CG contribution of £4.9m. 
7.  Climate Change, Sustainability and Environmental Implications
7.1.  The programme of projects will make significant contribution to the regional
environment through the remediation of significant land contamination, improvement
to the River Clyde and biodiversity net gain. 
8.  Other Implications
8.1.  The UKLUF awards provide significant capital investment in South Lanarkshire and
will contribute to priorities set out in Connect, the Council Plan 2022-27.    
9.  Integrated Impact Assessment and Consultation Arrangements 
9.1. There is no requirement to carry out an impact assessment in terms of the updates
contained within this report. Consultation and project development activity is ongoing
with a number of Resources. 
David Booth
Executive Director (Community and Enterprise Resources)  
8 November 2024 
123

Page 124

Link(s) to Council Values/Priorities/Outcomes
Values 
 Focused on people and their needs. 
Priorities 
 We will work towards a sustainable future in sustainable places. 
 We will work to recover, progress and improve. 
Outcomes 
 Good quality, suitable and sustainable places to live. 
 Thriving business, fair jobs and vibrant town centres. 
 Caring, connected, sustainable communities. 
 People live the healthiest lives possible. 
Previous References 
 UK Levelling Up Fund: Round 3, Community and Enterprise Resource Committee,
18 June 2024 
 UK Levelling Up Fund: Round 3, Community and Enterprise Resource Committee, 6
February 2024 
 UK Levelling Up Fund Update,  Community and Enterprise Resources Committee,
30 May 2023 
 Members Briefing UK Funds Briefing 10 September 2021 
List of Background Papers 
 None 
Contact for Further Information 
If you would like to inspect the background papers or want further information, please
contact:-  
Alison Brown, Head of Enterprise and Sustainable Development 
Email: alison.brown@southlanarkshire.gov.uk 
124

Page 125

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources) 
Subject: Larkhall Leisure Centre Replacement 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide an update on progress with regards to the replacement of Larkhall
Leisure Centre
[1purpose]
2. Recommendation(s)
2.1. Committee is asked to approve the following recommendation(s):-
[recs]
(1) to note that the Council, in conjunction with Hub South West have appointed
BAM Construction as the contractor;
(2)  to note that Hub South West have confirmed that the project is deliverable
within budget, based on 2300m2 GIFA;
(3) to note that an Engagement Strategy has been developed for the project, and a
number of community engagement sessions have already taken place; and
(4) to note that the programme is on track for site start in Autumn 2025 with a
completion in Summer 2027. 
3. Background
3.1. In February 2024, full Council approved an additional £12m to bridge the funding gap
for the replacement of Larkhall Leisure Centre. Funding of £11.9m had previously
been approved: Council (£6m), City Deal (£3m), Place Based Investment Funding
(£1.6m), Shared Prosperity Fund (£1m) and Regeneration Capital Grant Fund
(£0.3m). 
3.2.  The project is now underway to deliver the new £23.9m leisure facility to replace the
existing ageing facility. The project will be located on the grassed area behind the
existing building, adjacent to the school car park (please see Appendix 1). 
3.3.  The new facility will retain the same terms in relation to operation, managed on the
Council’s behalf by South Lanarkshire Leisure and Culture (SLLC), with the same
lease terms and conditions as is currently in place with the existing facility. 
12
125

Page 126

4. Progress Update 
Project Team
4.1.  Hub South West (Hub SW) have been appointed by Housing and Technical
Resources (HTR) to design and project manage the design, tender and construction
phases of the new Leisure Centre. HTR will manage the contract and interface with
Hub SW. 
4.2.  Following a robust procurement process, BAM Construction have been appointed as
the Tier 1 Contractor. BAM is supported by Holmes Miller Architects, Blyth and Blyth
consulting engineers, and Wallace Whittle environmental building services. The
project team have an excellent track record and will be striving towards Passivhaus
standards to meet energy efficiencies which will provide significant carbon and
revenue savings for the new Centre. 
4.3.  The client management role sits with the Enterprise and Sustainable Development
Service within Community and Enterprise Resources, working closely with key
managers within SLLC. 
Project Management 
4.4.  Project management and development arrangements will align with the stages and
approval gateways within the RIBA1 plan of work. A Project Board has been
established to monitor the overall progress, comprising of:- 
 Executive Director (Community and Enterprise Resources)
 Executive Director (Housing and Technical Resources)
 Chief Executive, SLLC
 Head of Enterprise and Sustainable Development
 Head of Finance (Strategy) 
Project Status
4.5.  The project is currently at concept design stage. The initial site layout and floor plans
have been developed based on 2300m2 gross internal floor area (GIFA). 
4.6.  An initial consultation survey was undertaken in March 2022 to prioritise the
accommodation space within the new centre. The findings from this survey have
been taken into consideration when developing the initial plans. For example,
swimming was considered to be the most important facility, and the proposed plans
include a like for like 25m 6 lane swimming pool with viewing gallery for swimming
lessons and galas. A fitness gym was considered as the second highest priority from
the survey, and the new plans include a gym space which is larger than the existing
gym areas. The plans also include a health suite (sauna and steam room) and a
double height fitness and dance studio which can used for fitness classes and
badminton. Engagement with the community also identified the need for a
community space within the new facility which has been accommodated.  This
community room is adjacent to the fitness and dance studio on the ground floor and
a partition wall will enable the space to be opened up to create a larger space for
community events and functions. 
4.7.  Community and Enterprise Resources are working closely with colleagues in SLLC
to develop the detailed design brief and ensure the space is maximised to reduce
operational costs for SLLC wherever possible. 
1 Royal Institute of British Architects
126

Page 127

4.8.  Hub SW have confirmed that the current scheme based on 2300m2 GIFA is within
budget and the programme is on track for site start in Autumn 2025 and completion
by summer 2027. 
4.9.  Various site investigation surveys are underway and advanced demolition works are
currently being investigated to determine whether sections of the existing centre will
require to be demolished as part of the enabling works. 
4.10  Planning and Building Control applications are scheduled for submission in Quarter 1
2025. 
Consultation and Engagement 
4.11. An extensive consultation exercise was carried out in March 2022, in conjunction
with key community groups, to help prioritise the accommodation to be provided
within the new facility. Over 1,200 survey responses were received, and the findings
were used to inform the initial design brief. 
4.12. Hub SW have developed an Engagement Strategy in consultation with the Council
and SLLC. Early engagement has included meetings with local Elected Members
and key community groups. 
4.13. Community Engagement drop-in sessions were also held in late October/early
November 2024 at various times and venues within Larkhall, including Larkhall
Leisure Centre, the Lighthouse and Larkhall Academy. 
5.  Employee Implications
5.1. Employees within Housing and Technical Resources and Community and Enterprise
Resources have a key role to play in delivering this multi-million project. Colleagues
within SLLC also have a valuable role in the wider project team in relation to the
operational requirements of the new facility. 
6.  Financial Implications
6.1. The budget of £23.9m consists of a number of different funding streams, including
Council funding, City Deal, Place Based Investment Fund, Shared Prosperity Fund
and Scottish Government Capital Regeneration Fund. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The project will be striving towards Passivhaus standards to meet energy efficiencies
which will provide significant carbon and revenue savings for the new Larkhall
Leisure Centre, and the design team will be able to evidence the carbon and
revenue savings. 
8. Other Implications
8.1. There are no other implications or risks associated with this report. 
9.  Integrated Impact Assessment and Consultation Requirements
9.1  An Integrated Impact Assessment is currently being progressed.   
9.2 Early engagement has taken place with local elected members and key community
representatives, as well as the consultation drop-in sessions outlined in section 4.13.
Consultation with stakeholders will be undertaken throughout the duration of the
project. 
127

Page 128

David Booth
Executive Director (Community and Enterprise Resources) 
7 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values 
 Focused on people and their needs. 
Priorities 
 We will work towards a sustainable future in sustainable places. 
Outcomes 
 People live the healthiest lives possible. 
Previous References
 2024/25 Capital Programme Update - Full Council, 21 February 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Gillian Simpson. Partner Liaison Manager 
Enterprise and Sustainable Development Services 
E-mail:  gillian.simpson@southlanarkshire.gov.uk 
128

Page 129

Appendix 1 
Site Plan 
129

Page 130

130

Page 131

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Centre West and East Kilbride Masterplan Update 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee on progress to date for the transfer of Centre West, East
Kilbride, to South Lanarkshire Council
 update Committee on progress made on the implementation of elements of the
East Kilbride Masterplan
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be noted.
[1recs]
3. Background
3.1. As previously reported, East Kilbride has faced a number of challenges over recent
years resulting in significant voids throughout the shopping centre. The challenges of
the retail environment resulted in the current tenant of the centre, Sapphire 15
s.a.r.l., being put into administration on 16 November 2022. Administrator, Interpath,
appointed a team of specialists to consider the future of the town centre. This was
led by Scoop Asset Management and included 360 Architecture and Savills property
agents who worked closely with officers to undertake a masterplanning exercise for
the town centre. As key stakeholders in the town centre, officers and asset
managers have worked closely to bring together the commercial realities and
potential of the centre into a town centre vision. The resultant East Kilbride
Masterplan was approved by this Committee on 13 September 2023. 
3.2. A key element to both the administration process and masterplan is that control of
Centre West reverts back to the Council on the basis that the land remains in the
Council’s ownership with Centre West developed under a ground lease. This is not
the preferred route to redevelopment however discussions have exhausted other
options and therefore a negotiated and managed transition to mitigate risk to the
Council insofar as is possible has been the key priority. 
13
131

Page 132

3.3. The Community and Enterprise Committee of 23 April 2024 gave endorsement to
enter Heads of Terms with Interpath for the transfer of Centre West Shopping
Centre. This decision was ratified at the Executive Committee of 8 May 2024.
Following Executive Committee approval, officers commenced Heads of Terms
(HoT) negotiations with administrators, Interpath and their advisors, for the transfer
of Centre West to the Council.   
3.4. The Committee of April 2024 also gave approval to appoint a professional team to
advise the Council during the negotiations and prepare for demolition and
redevelopment of Centre West. This team has been put in place to support the
transition of the property including Burness Paull (legal) and Knight Frank (Real
Estate Advice/ Asset Management). Turner and Townsend have also been
appointed as project managers with a range of technical sub-consultants.   
3.5. In addition, to work to ensure the smooth handover of Centre West to the Council,
officers have also been working towards delivery of the East Kilbride Masterplan.
The Community and Enterprise Committee of 23 April 2024 endorsed the
amendment of City Deal funding to realign £32.2 million towards town centre activity
in East Kilbride This approach was endorsed by the City Region Cabinet in August
2024 and an updated outline business case will be submitted to the February 2025
City Deal Cabinet following Executive Committee approval in December. This
realigned funding will allow demolition work to take place on Centre West and
progress with the Civic Hub element of the East Kilbride Masterplan. 
4. Centre West transfer
4.1. Heads of Terms negotiations have now concluded and were signed by the Council at
the end of September and endorsed by Executive Committee on 13 November 2024.
It is considered that these are the best terms which can be achieved to secure a
managed transition of the Centre back to the Council, and in turn support the
regeneration of East Kilbride Town Centre. Constructive agreement of the HoT
provides the Council with some certainty and the ability to plan ahead in a managed
way.  The details of the HoT are subject to a confidentiality clause. 
4.2. Legal advisors, Burness Paull, have been instructed to prepare a contract based on
the signed Heads of Terms. 
4.3. The remainder of the shopping centre is currently being marketed with a closing date
anticipated prior to Christmas.  The agreement between the Council and Interpath for
the transfer of Centre West gives comfort to potential buyers and gives the best
prospect of a controlled sale. It is likely that the Council will work closely with the
purchaser of the remainder of the town centre to achieve a positive outcome and
delivery of the East Kilbride Town Centre Masterplan. There will be a need for a
positive relationship with the new owner, including to deal with the practicalities of
the physical separation of the two centres and the demolition of Centre West by the
Council. 
4.4. Centre West transfers to the Council on 30 December 2025. Work has now
commenced with project management team, Turner Townsend, on the strategy for
the decommissioning of Centre West, demolition and subsequent creation of
development plots for residential development. 
132

Page 133

5. East Kilbride Civic Hub
5.1. As noted above, Committee approval was granted to prepare a revised City Deal
Outline Business Case to realign £32.2 million of City Deal funding to East Kilbride
town centre. This funding is required for Centre West demolition works as outlined
above and for the development of a new Civic Hub and urban realm in the heart of
East Kilbride. The vision for the Civic Hub is to establish a vibrant and recognisable
focal point for the town centre with a range of uses that will engage the local
community and encourage repeat visits to the town centre. 
5.2. Threesixty Architecture were appointed to further develop the hub proposals. As part
of this development they considered a variety of functions the new hub would be
required to perform. The East Kilbride masterplan currently shows the hub at the site
of the current Bingo Hall. As requirements for the site have crystalised two further
sites were added for consideration, namely Centre West and the Civic Centre site
which are in the control of the Council. 
5.3. After site evaluation it was noted that the Centre West site offers the greatest
opportunity and resilience to house the Civic Hub with City Deal funding already
allocated for the demolition of the existing structure. Development of the Civic Hub
on this site will allow for 250-300 residential units. This site is also a more prominent
town centre location 
5.4. With this in mind, the proposal is to develop the Civic Hub on the Centre West site as
this is considered to offer Best Value. 
5.5. Design work is ongoing, and consultation will be undertaken as detailed proposals
emerge.   
6.  East Kilbride Civic Centre
6.1. Although not captured within the boundary of the East Kilbride masterplan, as noted
at Committee on 26 June 2019, East Kilbride Civic Centre no longer functions
efficiently as a Council asset. The Civic Centre sits on a prominent site within the
town centre which has the potential to further strengthen masterplan proposals and
contribute to the regeneration of the town centre. As reported to Executive
Committee on 24 January 2024, the Civic Centre is currently being marketed by
Avison Young, on behalf of the Council, for redevelopment. The site is designated in
the local plan for town centre use and as such a range of functions can be
considered here. 
6.2. Key services performed by the Civic Centre that require a town centre location will be
provided for within the Civic Hub proposals.  It is acknowledged that within the Civic
Centre is the Ballerup Hall which would be reprovided within a new Civic Hub.   
6.3. Expressions of interest in the site/building have been received and a closing date of
30 January 2025 has been set.  Thereafter, consideration will be given to any offers
received and whether a sale will proceed at this time.   
7. Next Steps and Timescales
7.1. Officers will continue to work with Interpath and any new owner of East Kilbride
Shopping Centre to relocate tenants and achieve vacant possession in Centre West.
133

Page 134

7.2. Officers will work with the Project Management Team to prepare for the demolition of
Centre West and subsequent creation of development plots as close to the date of
transfer as possible. 
7.3. Officers will continue to work up proposals for the Civic Hub on the Centre West site. 
7.4. East Kilbride Civic Centre will go to closing date late November/ early December. 
7.5. Officers will continue to develop masterplan proposals and seek opportunities for the
development of East Kilbride town centre. 
8. Employee Implications
8.1. There are no employee implications as a result of the proposals set out in this report.  
The development and implementation of the masterplan will be led by officers within
Enterprise and Sustainable Development Services in consultation officers across
Planning, Roads, Property, Housing, Legal, Finance and Procurement Services. 
8.2. Staff currently working in Centre West are direct employees of Reith Lambert and
provided the Centre is no longer operational by 30 December 2025, will not transfer
to the Council. The outgoing tenant will indemnify any TUPE costs/obligations. 
8.3. Staff currently working in East Kilbride Civic Centre are aware of the marketing of the
building. Staff will be relocated in due course. 
9. Financial Implications
9.1. By entering into an agreement outlined in the HoT, the Council will enter into a
managed run down of the Centre with ownership transferring in December 2025.
This will see no increase in the Council’s financial liabilities during calendar years
2024 and 2025 from an operational property owner perspective i.e. all operational
costs will be borne by Sapphire 15 s.a.r.l. (in administration) until the date of
handover. 
9.2. By agreeing to the HoT, the Council and Interpath will work towards vacant
possession without the Council being liable for Centre West running costs until
December 2025. By this point a demolition strategy will have been prepared as well
as the procurement of a demolition contractor. 
9.3. The Empty Property Rates liability associated with Centre West falls to the council
and this is assumed within council budgets. As noted above, officers will undertake
work on a demolition strategy before the centre transfers to council ownership. This
will allow demolition work to commence quickly to mitigate the Empty Property Rates
liability. 
9.4. The City Deal OBC will be considered by the Council at Executive Committee in
December and by City Deal Cabinet in February 2025. This funding will allow
demolition of Centre West and development of the Civic Hub to progress. 
134

Page 135

10. Climate Change, Sustainability and Environmental Implications
10.1. Works to take forward the vision of the East Kilbride Town Centre Masterplan and
associated development has sustainability at the forefront and projects will be taken
forward in line with the Council’s sustainability objectives. Site demolition strategies
will focus on recycling and reusing materials wherever possible. In addition, there is
a focus on sustainable development throughout the project with consideration of
initiatives such as district heating. 
11. Other Implications
11.1. Agreeing HoT will protect the Council from any differing aspirations of new owners
and will show intent to the wider community. 
11.2. Locating the Civic Hub on the Centre West site will facilitate the development on
Council own land.   
11.3.  The sale and subsequent redevelopment of East Kilbride Civic Centre will augment
work currently being undertaken on East Kilbride Masterplan. 
12. Integrated Impact Assessment and Consultation Requirements
12.1. Integrated Impact Assessments will be undertaken as the project is developed.  
12.2. The East Kilbride Town Centre Masterplan consultation was held in September
2023. Officers were available in person in East Kilbride Shopping Centre for 3 weeks
and an online consultation was open for six weeks. Feedback for the project was
largely positive.  Further consultation will be undertaken on individual parts of the
masterplan projects such as the Civic Hub development at the appropriate points. 
David Booth
Executive Director (Community and Enterprise Resources)  
7 November 2024 
Link(s) to Council Values/Priorities/Outcomes
 Improve the quality of the physical environment.
 Support the local economy by promoting the right conditions for growth, improving
skills and employability.
 Partnership working, community leadership and engagement. 
Previous References
 Community and Enterprise Committee Report 24 April 24
 Executive Committee Report 8 May 24 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- Victoria Nelson 
Ext:        07385377225
E-mail:  victoria.nelson@southlanarkshire.gov.uk 
135

Page 136

136

Page 137

Report
Agenda Item 
1. Purpose of Report
1.1. The purpose of the report is to:- 
 provide a further update on the progress and enforcement of the national
prohibitions on pavement parking, double parking and parking at dropped kerbs 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the contents of the report be noted; and
(2) the commencement of formal enforcement from 6 January 2025 be noted. 
3. Background
3.1. As reported to the Community and Enterprise Resources Committee on 7 November
2023, Part 6 of the Transport (Scotland) Act 2019 introduced the statutory legislation
for a national ban on pavement parking, double parking and parking at dropped
kerbs to make it easier for Local Authorities to ensure pavements and roads are
safer and more accessible to all. 
3.2. The Parking Prohibitions (Enforcement and Accounts) (Scotland) (Regulations) 2023
were subsequently enacted on 11 December 2023, providing Local Authorities with
the powers to enforce the new prohibitions. This secondary legislation confirmed the
provisions outlined to this Committee on 7 November 2023. Further information on
the legislation and exemptions is available at Transport Scotland: Parking and the
Transport (Scotland) Act 2019). 
3.3. As noted in the report to Committee on 7 November 2023, a statutory duty means
that the Council must comply with the requirements of the relevant legislation. A
statutory power, as is the case with this legislation, means that the Council has
discretion how to exercise the power. Services across the Council have many
powers to manage and deliver services all of which are done so in full consideration
of the available resources, commensurate with other priorities and in full
consideration of the likely impacts.
Community and Enterprise Resources Committee
26 November 2024
Executive Director (Community and Enterprise
Resources)
Report to:
Date of
Meeting: Report
by:
Pavement Parking Subject
:
14
137

Page 138

3.4. The Regulations have confirmed that the Penalty Charge Notice (PCN) for pavement
parking, double parking and parking at dropped kerb offences will be issued at £100
and discounted to £50 for payments made within 14 days and increased to £150 if a
Charge Certificate is issued. This is in line with all other Penalty Charge Notices
currently issued for other parking offences within South Lanarkshire, as approved by
the Council’s Executive Committee on 13 September 2023. 
3.5. Some exceptions to the new prohibitions apply across Scotland. These are for
circumstances in which it is necessary or expedient for motor vehicles being used by
certain bodies, or in certain circumstances, to park on the footway. These can be
summarised as emergency / medical or military activities, roadworks / postal services
/ waste collection services or delivery services, activities to allow a response to an
emergency or accident, and for vehicles used for undertaking roadworks or removal
of an obstruction to traffic. These nationwide exceptions apply across the road
network and thus no signage is required. 
3.6. Transport Scotland have provided guidance to Local Authorities on the use of an
assessment process using an evidence-based system to determine whether an
exemption or other alternative measures may be required for certain roads or areas.
Prior to the approval of any exemptions, Local Authorities must undertake a statutory
formal consultation process through a Proposed Pavement Parking Exemption Order
before any exemptions are approved. This essentially mirrors the process
Committee will be familiar with in terms of the promotion of Traffic Regulation Orders
(TROs). 
3.7. The Council’s Scheme of Delegation was considered by the Council on 11
September 2024 and, delegated authority was granted to the Executive Director,
Community and Enterprise Resources, to carry out the operational functions relevant
to the Council in terms of various Transport Acts and any new and / or subsequent or
amending legislation, such as the Transport (Scotland) Act 2019. 
4. Progress
4.1. Since the enactment of the legislation, we understand that several local authorities in
Scotland have now commenced enforcement, with other local authorities expected to
commence by the end of this year. Progress has been influenced across Scotland by
differing back office systems and several authorities still do not have a formal
Decriminalised Parking Enforcement (DPE) arrangement in place; noting South
Lanarkshire Council has had this in place since 2005. 
4.2. As agreed by Community and Enterprise Committee on 7 November 2023 a ‘soft’
approach has been adopted so far across South Lanarkshire noting that, to date, no
formal enforcement has been undertaken by way of the issuing of a Penalty Charge
Notice (PCN). Consideration has been given to the impacts and / or displacement
that would be experienced across our town, villages or within residential areas. This 
approach has used advisory warning notices as detailed at Appendix 1. 
4.3. Over the last 6 months, in preparation for formal enforcement, officers have been
conducting various workstreams including considering and assessing areas and
roads for exemptions, preparing the back office systems to allow PCNs to be issued,
filling of Parking Attendant (PA) vacancies in our enforcement team, training, and
recruitment of a new Parking Unit Team Leader.
138

Page 139

4.4. In terms of potential exemptions an initial exercise reviewing all roads within South
Lanarkshire has now been completed and categorises roads into areas where it is
felt that exemptions could be necessary and other areas where they are unlikely to
be required. 
4.5. At this stage, this completed exercise will provide a useful reference document, and
following the gaining of operational enforcement experience and monitoring (e.g.
over a 12 month period) further consideration will be given to the need for or
otherwise for formal exemptions or alternative measures. 
4.6. The Scottish Government guidance that accompanies the legislation explains that it
is anticipated exemptions to the pavement parking prohibition will not be the norm.
Where an exemption is put in place, the area subject to the exemption must be
clearly signed and marked. 
5. Next Steps
5.1. Prior to commencing any enforcement, changes are required to the Parking Unit’s
existing back-office systems support. This includes the production of new
enforcement documents, system coding configuration for offences and printing of
new ticket rolls. Much of this is now in place and a test system is presently being
trialled to ensure it is functioning correctly. 
5.2. Training is being provided to all Parking Attendants to ensure that any resulting
enforcement of the parking prohibitions is fair, accurate and consistent. Training will
ensure Parking Attendants understand all the primary and secondary legislation
associated with the parking prohibitions. This includes understanding the detail of the
pavement parking, double parking and dropped kerb parking legislation as well as
any exemptions and exceptions to the prohibitions. 
5.3. Effective enforcement of the pavement parking legislation is scheduled to commence
from 1 January 2025, subject to the successful conclusion of the back office
workstream trial noted above.  Enforcement will continue to consider the impacts and
/ or displacement that would be experienced across our towns, villages or within
residential areas.  Enforcement will also be undertaken in a balanced, proportionate,
and pragmatic way and this approach will be at the core of any formal operational
enforcement activity undertaken and will be kept under review by the Service. 
5.4. Extreme care will be taken to avoid generating new or intensifying existing
neighbourhood disputes. The expected first course of action for residential locations
will be the ‘soft’ behavioural change approach noted above and in Appendix 1 and if
necessary the involvement of the Council’s mediation team.  A balanced approach
will be taken to any locations brought to our attention and consideration will be given
as to the appropriate level of initial and ongoing action on a case by case basis while
considering the resources available. 
5.5. Prior to enforcement commencing in this regard, the Council will run a
complementary communications campaign similar to that already implemented
nationally.
139

Page 140

6. Employee Implications
6.1. At present, there are 14 Full Time Equivalent (FTE) Parking Attendant (PA) posts
undertaking parking enforcement across South Lanarkshire. There are currently five
vacancies and candidates are being sought for these posts, noting this is a difficult
area in terms of attracting suitable candidates. 
6.2. A new Parking Unit Team Leader has also recently been recruited and this will assist
in bringing the various workstreams together allowing for a more effective approach
to parking management and enforcement across South Lanarkshire. 
6.3. It is anticipated that, in the short term, due to budgetary constraints, enforcement
associated will continue to be undertaken within the current staffing establishment,
necessitating enforcement to be prioritised. This situation will remain under constant
review. 
7. Financial Implications
7.1. It is expected that any income generated from the new powers will contribute to the
implementation and running costs of the parking service and is unlikely to generate
any discernible additional income at this stage. 
7.2. The implementation of any exemptions will also incur costs, including the preparation
of any Exemption Orders, lining and signing and for any other measures. This will
continue to be a key consideration when locations are considered for such
exemptions. 
7.3. At this time, resulting costs associated with lining and signing would be subject to bid
submissions to Transport Scotland. 
8. Climate Change, Sustainability and Environmental Implications
8.1. While there are no defined environmental implications, or implications for
sustainability in terms of the information contained within this report, failure to have
effective demand management measures in place across our towns could see the
use of the private car begin to increase at the expense of more active/sustainable
modes. 
9. Other Implications
9.1. There are no other implications or risks in relation to the information contained within
this report. 
10. Integrated Impact Assessment and Consultation Arrangements
10.1. Equalities impacts were considered as part of the legislative process when the Act
progressed through the Scottish Parliament. However, the guidance published by
Scottish Ministers notes that appropriate Impact Assessments should be undertaken
to ensure that proposals do not inadvertently discriminate against any protected
groups. 
10.2. This has been considered and an Integrated Impact Assessment has been prepared
and is available on request.
140

Page 141

10.3. As noted earlier in the report the new powers available to Councils prohibits double
parking and parking on pavements and gives Council’s the powers needed to
enforce as necessary.  This will help improve safety and accessibility for all, and
positive impacts are expected, particularly for our most vulnerable road users
including disabled individuals, the young and elderly people.  No significant negative
impacts across the range of assessment areas are expected at this stage in terms of
the Council progressing with the operational implantation of these powers. 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
 People live the healthiest lives possible 
Previous References
 Community and Enterprise Resources Committee 7 November 2023 - Pavement
Parking
 Executive Committee, 13 September 2023 - Parking - Penalty Charge Notices'. 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Colin Park, Head of Roads, Transportation and Fleet Services
Tel:- 07795 090 494
E-mail:- colin.park@southlanarkshire.gov.uk 
141

Page 142

Appendix 1 
142

Page 143

143

Page 144

144

Page 145

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: UK Shared Prosperity Fund Progress Report 
1. Purpose of Report
1.1.  The purpose of the report is to: - 
 update the Committee on the progress of the UK Shared Prosperity Fund
(UKSPF) Investment Plan 
2. Recommendation(s)
2.1.  The Committee is asked to approve the following recommendation(s):- 
(1) that the current progress of the UKSPF be noted; and
(2) that the changes to the appendices to the report, approved by the Executive
Director (Community and Enterprise Resources) under delegated authority,
be noted. 
3. Background
3.1. As previously reported, South Lanarkshire Council received a conditional allocation
of £12,221,811 from the UK Government providing a mix of capital and revenue
funding for projects which meet the UKSPF four investment themes, communities
and place, support for local business, people and skills and multiply. The Fund runs
for three financial years from 2022/2023 to 2024/2025. 
3.2. On 9 August 2022, Committee considered a report outlining the approach for South
Lanarkshire and agreed to work as part of the Glasgow City Region (GCR) with a
single Investment Plan for the Region. 
3.3. On 29 August 2023, Committee approved the expenditure profile and authorised
delegated authority to the Executive Director of Community and Enterprise
Resources to vary spend priorities for South Lanarkshire. It was agreed annual
progress reports would be brought to Committee. 
3.4. The Glasgow City Region Investment Pan for a combined total value of £73,874,280
was submitted on 30 August 2022 and approval of the Investment Plan was received
from the UK Government on 5 December 2022.  
15
145

Page 146

4. Current Progress of UKSPF South Lanarkshire Investment Programme 
4.1.  Quarterly and six-monthly monitoring and reporting to GCR and the UK Government. 
is being undertaken. The expenditure summary for each Council within the Glasgow
City Region’s UKSPF to 2023/2024 is set out in the Table 1 below: 
Table 1
Councils
Allocation Yr1 &
Yr2
Cumulative Spend - March
2024 % of spend
GCC £11,052,027 £11,221,173 102%
RC £2,556,696 £2,141,555 84%
SLC £4,982,646 £4,021,997 81%
ERC £1,339,978 £1,001,858 75%
EDC  £1,439,086 £1,046,924 73%
NLC £5,673,330 £3,743,439 66%
IC £1,453,118 £922,157 63%
WDC £1,590,697 £940,565 59%
GCR PMO £470,859 £132,005 28%
GCR Total £30,558,437 £25,171,673 82% 
4.2. South Lanarkshire Council claimed £4,021,997 (81%) of the approved Year 1 and
Year 2 allocation to end March 2024.   
4.3. Each UKSPF Intervention Theme is listed in Table 2 below including revisions
between themes using the delegated authority provided to the Executive Director of
Community and Enterprise Resources.  Further details are included within Appendix
3.   
Table  2
INTERVENTION THEME         
Approved        
Totals 
Revised        
Totals 
Change
Community and Place Intervention  £3,698,791  £3,711,456 + £12.665
Local Business Intervention  £3,066,504  £3,021,284 - £45,220
People and Skills Intervention  £2,941,472  £2,941,472 £0 
Multiply Intervention   £2,026,172  £1,938,284 - £87,888 
GGR wide programmes   £ 120,443 +£120,443
4 % Management                           £488,872  £488,872  £0
TOTAL ANNUAL BUDGET                      £12,221,811  £ 12,221,811 
4.4.   Budgets and current spend to 30 June 2024 for each of the priorities are
summarised in Table 3 below and in detail in Appendix 1.  The UK Government
provided guidance in September to all authorities delivering UKSPF that regardless
of the outcome of the Budget on 30 October, there will be no mechanism to carry
forward any UKSPF underspends into future years. Delivery of the Councils UKSPF
spend is progressing well and a forecast exercise has been completed showing full
spend to the end of the current programme in March 2025.
146

Page 147

Table  3
INTERVENTION THEME          
Approved            
Totals 
Spend to        
June 2024
%         
of Spend
Community and Place Intervention £3,711,456 £1,311,998 35%
Local Business Intervention £3,021,284 £790,195 26%
People and Skills Intervention £2,941,472 £1,359,164 46%
Multiply Intervention £1,938,284 £998,242 51%
GGR wide programmes £ 120,443 £25,667 21%
4 % Management £488,872 £243,370 50%
TOTAL ANNUAL BUDGET £ 12,221,811 £4,728,636 39% 
4.5.  Aligned with the UKSPF priorities are a range of outputs and outcome targets.  
Complete outputs will be reported in full at the end of the Programme.  For
information, a summary of current outputs and outcomes targets is provided in
Appendix 2. 
4.6.   Delivery across the programme is progressing as expected and is monitored by
officers within Enterprise and Sustainability Services. 
4.7.  Each Service remains responsible for ensuring that it has the appropriate authority to
deliver activity, including where appropriate relevant Resource committee approvals. 
5.  UKSPF Post 31 March 2025
5.1.  The current UKSPF is due to end on 31 March 2025.  In the recent Budget, the UK
Government announced UKSPF would be extended for one further year to
2025/2026, however, with a 40% cut in funding.  Officers have yet to receive details
of the additional funding, however, are preparing funding options. 
6.  Employee Implications
6.1.  The UKSPF allows for 4% of the allocation to be used for the management and
administration of the Fund. This is used to fund existing staff within Economic
Development. . 
7.  Financial Implications
7.1.  The UKSPF represents additional resources to deliver the Council’s Economic
Strategy, Tourism Strategy and Social Economy Strategy.   
8. Climate Change, Sustainability and Environmental Implications
8.1. Across two Investment Themes there is activity that will support the reduction of
carbon emissions and sustainability. Within the Community and Place Intervention
funding supported the Climate Emergency and Resilience Fund grants. Within
Business Intervention funding for the Extend Plus programme provides support for
SME to complete Carbon Baseline reports understanding where carbon emissions
can be reduced. 
9.  Other Implications
9.1. Whilst a 2025/26 UKSPF programme is welcomed, a reduction in the budget will
have a significant impact on the delivery of projects and funding for staff. Funding
options are currently being considered. 
147

Page 148

10.  Integrated Impact Assessment and Consultation Arrangements
10.1.    This report does not introduce a new policy, function or strategy and, therefore, no 
impact assessment is required. 
10.2. The UKSPF programme was developed following consultation with the Lanarkshire
Economic Forum in May 2022 and local partners 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Community and Enterprise Resources Committee 29 August 2023 – UK Shared
Prosperity Fund 
List of Background Papers
 Community and Enterprise Resources Committee 9 August 2022 – UK Shared
Prosperity Fund 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kenny Lean  
Economic Development Manager (Funding and Rural)
Planning and Economic Development Services
E-mail: Kenny.Lean@southlanarkshire.gov.uk 
148

Page 149

Appendix 1 – UKSPF Current Spend at 30/06/2024 
UK SPF Priority summary description
Community and Place Interventions SLC Activity summary Approved
Expenditure/Forecast
Current
Spend
Progress to
Forecast (%)
S1 - Place based investments, regeneration &
town centre improvements
Supporting place based funding programme
and town centres  £613,000 £390,000 64%
S2 - Support/improve community assets &
infrastructure projects
Support to communities for net zero
sustainability through grants and SLC resources £300,000 £234,000 78%
S4 - Design & management of the built &
landscaped environment Upgrade to town centre CCTV  £547,506 £288,251 53%
S5 - Support sport, arts, cultural, heritage &
creative activities
Investment in SLC culture and heritages, sports
facilities investment  £1,000,000 £0 0%
S7 - Campaigns to encourage visiting &
exploring the local area
Supporting Visit Lanarkshire marketing
campaigns £100,000 £57,561 58%
S9 - Investment in capacity building & resilience
for local groups
Supporting Can Do Grants, community
empowerment  £715,950 £239,881 34%
S11: Funding to support relevant feasibility
studies
Feasibility studies including Country Parks and
Adventure tourism   £435,000 £102,305 24%
Communities & Place Interventions Total  Totals  £3,711,456 £837,998 22%
149

Page 150

Appendix 1 – UKSPF Current Spend at 30/06/2024 
UK SPF Priority summary description
Local Business Intervention SLC Activity summary Approved
Expenditure/Forecast
Current
Spend
Progress to
Forecast (%)
S14 - Development & promotion of the visitor
economy
Support to tourism sector through grants and
support measures £275,000 £40,327 14%
S15 - SME development grants & support. Small Business Grants  £1,000,000 £440,313 44%
S18  - Investing in enterprise infrastructure, site
development projects
Investment in energy efficiency in SLC
industrial infrastructure £909,140 £0 0%
S20  - Expert business advice & support
programmes, local & regional Provide specialist advice services to business  £475,756  £138,834  29%
S22  - Growing the local social economy. Supporting Social Enterprise and strategy £200,000 £0 0%
S27  - Support relevant feasibility studies Feasibility reports on energy efficiency in
industrial infrastructure  £40,000 £9,333 23%
S30 -  Investment to protect from natural
hazards, flooding & coastal erosion Clyde Gateway riverbank stabilisation £121,388 £121,388 100%
Local Business Interventions Total   £3,021,284 £790,195 26%
150

Page 151

Appendix 1 – UKSPF Current Spend at 30/06/2024 
UK SPF Priority summary description
People and Skills Intervention SLC Activity summary Approved
Expenditure/Forecast
Current
Spend
Progress to
Forecast (%)
S31 -  Employment support for economically
inactive people
Targeted support at the least economically
active individuals. Supporting SLC No One Left
Behind Plan
£93,800 £44,800 48%
S32  - Courses including basic skills for those
not economically inactive
Support for ESOL English for Speakers of
Other Languages £120,337 £0 0%
S35  - Employability programmes & advice - No
One Left Behind agenda etc
Main programme supporting SLC No One Left
Behind Plan £1,547,210 £659,033 43%
S39  - Education & skills targeting the
vulnerable leaving school School leavers support into destinations £852,000 £426,000 50%
S40  - Support for community learning &
development VASLAN 3rd sector employability support £328,125 £229,331 70%
People & Skills Intervention Total   £2,941,472 £1,359,164 46% 
151

Page 152

Appendix 1 – UKSPF Current Spend at 30/06/2024 
UK SPF Priority summary description
Multiply Intervention SLC Activity summary Approved
Expenditure/Forecast
Current
Spend
Progress to
Forecast (%)
S43  - Courses for parents wanting to increase
numeracy skills
Education maths support to parents in deprived
areas £728,407 £317,834 44%
S45  - Courses aimed at encouraging people to
upskill to access jobs/careers  Maths support for those in college £238,747 £165,318 69%
S49  - Courses designed to help people use
numeracy to manage money Adult Learning numeracy support £580,880 £200,089 34%
S51  - Provision developed in partnership with
community organisations
VASLAN Community organisation grants
supporting numeracy £390,000 £315,001 81%
Multiply Intervention Total   £1,938,034 £998,242 55% 
152

Page 153

Appendix 2 – UKSPF Current Indicators at 30/06/2024  
Communities & Place Outputs achieved so far (cumulative)  
Output Target
Number of commercial buildings completed or improved (Number of buildings) 4
Number of rehabilitated premises (numerical value) 2
Amount of rehabilitated land (M2) 200
Amount of public realm created or improved (M2) 10,000
Number of low or zero carbon energy infrastructure installed Number of units) 5
Amount of low or zero carbon energy infrastructure installed (M2) 100
Number of organisations receiving financial support other than grants (Number of organisations) 51
Number of organisations receiving grants (Number of organisations) 35
Number of organisations receiving non-financial support (Number of organisations) 70
Number of neighbourhood improvements undertaken (Number of improvements) 12
Number of amenities/facilities created or improved (Number of amenities or facilities) 19
Number of new or improved cycleways or footpaths (Number of cycleways or footpaths) 3
Total length of new or improved cycleways or footpaths  1000
Number of Tourism, Culture or heritage assets created or improved (Number of assets) 6
Number of people reached (Number of people) 100000
Number of people attending training sessions (Number of people) 50
Communities & Place Outputs achieved so far (cumulative)  
Outcome Target
Jobs created as a result of support (Number of Full time equivalent (FTE) 4
Increased footfall (Number of people) 200
Estimated Carbon dioxide equivalent reductions as a result of support (Tonnes of CO2e) 20
Improved perception of facilities/amenities(Number of people) 200
Increased users of facilities/amenities (Number of users) 100
Improved perception of facility/infrastructure project (Number of people) 500
Increased use of cycleways or footpaths (Number of cyclists or pedestrians) 100
Improved perception of safety (Number of People) 100
Neighbourhood crimes (Number of crimes reported) 100
Improved engagement numbers (Number of people) 300
Increased number of web searches for a place (Number of web searches) 250
153

Page 154

Appendix 2 – UKSPF Current Indicators at 30/06/2024 
Supporting Local Business Outputs achieved so far (cumulative)  
Output Target
Number of enterprises receiving financial support other than grants (Number of enterprises) 64
Number of enterprises receiving non-financial support (Number of enterprises) 86
Number of enterprises receiving grants (Number of enterprises) 87
Number of potential entrepreneurs provided assistance to be business ready (Number of entrepreneurs) 30
Number of Tourism, Culture or heritage assets created or improved (Number of assets) 5
Number of commercial buildings completed or improved (Number of buildings) 15
Amount of commercial buildings developed or improved (M2) 3500
Number of local events or activities supported (Number of events/activities) 5
Number of people attending training sessions (Number of people) 100
Number of events/participatory programmes (Number of events/participatory programmes) 6
Number of properties better protected from flooding and coastal erosion (Number of properties) 2
Supporting Local Business Outcomes achieved so far (cumulative)  
Outcome Target
Jobs created as a result of support (Number of full time equivalent (FTE)) 26
Number of new enterprises created as a result of support (Number of new enterprises) 30
Increased footfall (Number of people) 1
Increased visitor numbers (Number of people) 1
Increase in visitor spending (Amount of visitor spend in %) 1%
Increased amount of investment (£)  £1,350,000 
Number of organisations engaged in new knowledge transfer activity following support (Number of Organisations) 25
Number of new to market products (Number of products) 5
The number of projects arising from funded feasibility studies (Number of projects) 4
Increased number of properties better protected from flooding and coastal erosion (Number of properties) 2 
154

Page 155

Appendix 2 – UKSPF Current Indicators at 30/06/2024 
People & Skills Outputs achieved so far (cumulative)  
Output Target
Number of economically inactive people engaging with keyworker support services (Number of people) 50
Number of economically inactive people supported to engage with the benefits system (Number of people) 16
Number of socially excluded people accessing support (Number of people) 428
Number of people supported to access basic skills courses (Number of people) 10
Number of people accessing mental and physical health support leading to employment (number of people) 149
Number of people supported to engage in job-searching (Number of people) 428
Number of people receiving support to gain employment (Number of people) 197
Number of people receiving support to sustain employment (Number of people) 78
Effective working between keyworkers and additional services (Number of engagements) 50
Number of people supported to participate in education (Number of people) 20
Number of people taking part in work experience programmes (Number of people) 170
Number of people retraining (Number of people) 165
Number of people in employment engaging with the skills system (Number of people) 165
People & Skills Outcomes achieved so far (cumulative)    
Outcome Target
Number of economically inactive individuals engaged with benefits system following support (Number of people) 50
Number of active or sustained participants in community groups as a result of support (Number of participants) 2
Number of people reporting increased employability through development of interpersonal skills funded by UKSPF (Number
of people) 50
Number of people with basic skills following support (Number of people) 3
Number of people in supported employment (Number of people)  3
Number of people engaging with mainstream healthcare services (Number of people) 151
Number of people sustaining engagement with keyworker support and additional services (Number of people) 438
Number of people engaged in job-searching following support (Number of people) 448
Number of people in employment, including self-employment, following support (Number of people) 765
Number of people sustaining employment for 6 months (Number of people) 70
Number of people in education/training following support (Number of people) 319
Number of people experiencing reduced structural barriers into employment and into skills provision (Number of people) 578
Number of people familiarised with employers expectations, including, standards of behaviour in the workplace (Number of
People) 578
155

Page 156

Appendix 2 – UKSPF Current Indicators at 30/06/2024 
Multiply Outputs achieved so far (cumulative)    
Output Target
Number of adult numeracy courses run in a local area through Multiply (Number of courses) 366
Number of people participating in Multiply funded courses (Number of people) 3840
Number of people achieving a qualification (Number of people) 200
Number of courses developed in collaboration with employers (Number of courses) 6
Number of people referred from partners onto upskill courses (Number of people) 100
Number of different cohorts participating in numeracy courses (Number of cohorts) 0
Courses set up to increase confidence/ number of people engaged in courses 840
Multiply Outcomes achieved so far (cumulative)    
Outcome (Bespoke Interventions) Target
Number of adults achieving maths qualifications up to, and including, Level 2 equivalent (Number of Adults) 20
Number of adults participating in maths qualifications and courses up to, and including, Level 2 equivalent (Number of
adults) 20 
156

Page 157

Appendix 3  Notification of Change    
Description Intervention theme Intervention Intervention value
Movement to GCR Clyde Climate Forrest Community and Place
S9 Investment in capacity building,
resilience, support for local civil society
and community groups.
Glasgow city region  £34,800 
Movement to GCR Extend Plus business support Local Business Support S20: Support for expert business advice
and support programmes Glasgow city region  £45,220 
Movement to GCR Multiply publicity Multiply
S45: Courses aimed at people who can’t
apply for certain jobs because of lack of
numeracy skills 
Glasgow city region  £40,523 
Movement of £47,506 from Multiply to People and
Skills Multiply
S45: Courses aimed at people who can’t
apply for certain jobs because of lack of
numeracy skills 
S36: Support for local areas
to fund local skills needs.  £47,506 
Movement of £47,506 from People and Skills
training to Community and Place People and Skills  S36: Support for local areas to fund
local skills needs.
S4: Design and management
of the built and landscaped
environment 
£47,506 
Movement of £400,000 within Community and Place Community and Place S6: Funding for active travel
enhancements
S11: Funding to support
relevant feasibility studies  £400,000 
Movement of £35,000 within Community and Place Community and Place
S9 Investment in capacity building,
resilience, support for local civil society
and community groups.
S11: Funding to support
relevant feasibility studies  £35,000 
157

Page 158

158

Page 159

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Lanarkshire Business Excellence Awards 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 update Committee on arrangements for the 2025 Lanarkshire Business Awards
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the content of the report be report.
[1recs]
3. Background
3.1. 2025 will mark the 30th anniversary of the Lanarkshire Business Excellence Awards.
The event is run jointly by North and South Lanarkshire Councils with the support of
an external events management company who have been awarded this contract by
North Lanarkshire Council (NLC). 
3.2. The Awards celebrate the success of companies across Lanarkshire and recognise
business success across all sectors and size of businesses. The awards cover the
following categories with last year’s winners included:- 
• Lanarkshire’s Best Business (0-10 employees) - Big Bite Catering
• Lanarkshire’s Best Business (11-50 employees) - McCrae Training
• Lanarkshire’s Best Business (51+ employees) - Probe Test Solutions
• Excellence in Customer Service Award - Jigsaw Travel
• Lanarkshire’s Best New Business - MDH Recruitment
• Lanarkshire’s Innovation in Business Award - The Power Within Training
• Lanarkshire Community Impact Award - MorphFit Gentle Movement Project
• Lanarkshire’s Green Business Award - Equis Ice Cream
• Lanarkshire’s Food & Drink Award - Lazy Day Foods
• Lanarkshire’s Apprentice of the Year Award - MGB Services 
3.3. The Awards typically accommodate circa 450 guests and have traditionally been held
at Motherwell Concert Hall, however, this building is currently closed. As a result, a
new venue has been sought to host the 2025 Awards. 
16
159

Page 160

3.4. The cost of running the event is met by sponsorship of the overall awards, sponsorship
of the award categories, ticket sales and residual contingency funds held by North
Lanarkshire Council on behalf of both councils. This approach has allowed the event
to be self-funding and does not require a financial contribution from either council,
although. The Business Support teams from each council are jointly responsible for
the management and delivery of the event. 
4. 30th Anniversary Awards 
4.1. As outlined, Motherwell Concert Hall is currently unavailable and, therefore, an
alternative location required to be identified for the Awards. Due to the number of
guests, there are a limited number of venues in Lanarkshire capable of hosting the
event. All potential venues across Lanarkshire have been considered including AlonA
Hotel, Hilton Strathclyde, Dakota Eurocentral, Hamilton Park Racecourse and
Macdonald Crutherland Hotel, however none could accommodate more than 300
guests. To hold the awards dinner at any of these venues, the number of guests would
have to reduce, as well as reducing the number of finalists per category, and the
number of categories. 
4.2. Consideration was also given to holding the event in Glasgow. The perception of
holding the Lanarkshire Business Awards dinner in Glasgow, rather than at a
Lanarkshire venue was considered not to be appropriate. 
Caldedonia Gladiators Arena, East Kilbride
4.3. The Caledonia Gladiators Arena can accommodate up to 500 guests for dinner with
ample on-site parking. Catering will be provided by Crossbaskets Castle in Blantyre
which is under the same ownership as the Arena. 
4.4. The capacity of this venue allows the business awards to be held on the same scale
as previous years, with no requirement to reduce award category numbers and
sponsors. 
4.5. Terms have been agreed with the venue and the event is scheduled for 30 May 2025. 
4.6. Planning for the event is already underway with nominations invited in January 2025. 
5. Employee Implications
5.1. The Business Support teams from each council are jointly responsible for the
management and delivery of the event. 
6. Financial Implications
6.1. As outline in paragraph 3.4, the event is managed in such a way that it is self-financing.
It is anticipated that the cost of the event will be £49,000, and it is expected this cost
will be fully covered by sponsorship and ticket sales, however a contingency is in place
if necessary. 
7. Climate Change, Sustainability and Environmental Implications
7.1. There are no Climate Change, Sustainability and Environmental Implications as a
result of this proposal.  
160

Page 161

8. Other Implications
8.1. The closure of Motherwell Concert Hall had brought the ability to run the event into
doubt. Had it not been able to proceed there is doubt whether momentum would be
lost with the business community placing its future in doubt. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. As this is a continuation of existing activity no Integrated Impact Assessments has
been undertaken. 
9.2 Consultation with all appropriate internal services and with North Lanarkshire Council
have been undertaken. 
David Booth
Executive Director ( Community and Enterprise Resources) 
18 November 2024 
Link(s) to Council Values/Priorities/Outcomes
• Support the local economy by promoting the right conditions for growth, improving skills
and employability.
• Partnership working, community leadership and engagement. 
Previous References
None 
List of Background Papers
None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:- 
Eliot Jordan, Business Support Team Leader
Tel: via MS Teams
E-mail: eliot.jordan@southlanarkshire.gov.uk 
161

Page 162

162

Page 163

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Update of the Community and Enterprise Resources
Risk Register and Risk Control Plan 
1. Purpose of Report
1.1. The purpose of the report is to:-[
purpose]
 present an update on the Risk Register and Risk Control actions for Community
and Enterprise Resources
[1purpose]
2. Recommendation(s)
2.1. The Community and Enterprise Resources Committee is asked to approve the
following recommendation(s):-
[
(1) that the current position with regards to the Resource Risk Register is noted.
[1recs] 
3. Background
3.1. The Council’s Risk Management Strategy promotes consideration of risk in service
delivery, planning and decision-making processes. The Strategy requires Resources
to record and review risks and control actions regularly. Community and Enterprise
Resources follow the guidance in developing, monitoring and updating the risk
register on an ongoing basis. 
3.2. The purpose of the Register is to ensure that the Resource is fully aware of its top
risks; that these risks are prioritised; and that controls are in place to eliminate or
minimise the impact of the risks. 
3.3. The Resource scores the risks in accordance with the Council scoring mechanism,
based on likelihood and impact. This results in risks being scored between one and
twenty-five (low – very high). 
3.4. Risks are scored on their inherent score (risk if we do nothing) and their residual risk
(risk after applying controls). The Council’s scoring matrix is attached at Appendix 1. 
3.5. The last update of the Community and Enterprise Resources Risk Register was
reported to Committee on 7 November 2023. 
3.6. The Resource’s Risk Register, and Risk Control Plan has been reviewed. This work
was completed in August 2024.
17
163

Page 164

3.7. The Central Risk Management team annually review Resource compliance with the
Risk Management Strategy. The outcome of the 2023/2024 review identified that
Community and Enterprise Resources achieved 100 per cent compliance, scoring 45
out of a possible 45. 
4. Resource Risk Management
4.1. Each Resource has a Resource Risk Management Group which has responsibility
for the promotion and management of risk. 
4.2. The Community and Enterprise Resources’ Risk Management Group continues to
meet as required. 
4.3. The work of the Group over the last year has focused on the review and update of
the Resource Risk Register and ensuring that the Register reflected the Council Plan
and individual Service Plans. 
5. Risk Register
5.1. Work has been completed by the Resource Risk Group to finalise the review of the
Resource Risk Register. The review considered risks at a Service level, as well as
strategic Council risks. 
5.2. The Resource Risk Register will be monitored on an ongoing basis to allow new
risks to be added and for the control measures and scores of the existing risks to be
reviewed in light of new information. 
5.3. Risks can result from internal or external influences, with examples being the impact
of projected funding cuts or legislative changes or the impact of internal service
changes. 
5.4. The development process for the Resource Plan requires a risk assessment process
to be undertaken as appropriate, resulting in some actions within the Resource Plan
having a corresponding risk identified within the Risk Register. 
5.5. The main changes to the Register are summarised below:- 
 two new Council Top Risks have been added:- 
 The Council inherits commercially unviable shopping centres due to the
financial failure of existing owner/management companies resulting in
significant financial and operational liabilities for the Council.
 The Council fails to comply with its statutory duties by not conducting
sufficiently robust impact assessments where the same are required in
respect of budget/service redesign proposals, leading to potential legal and
financial challenges, which could result in failure to deliver those proposals. 
 two new Resource Top Risks have been added:- 
 The Council fails to deliver Town Centre Masterplans.
 Insufficient waste processors to secure competitive bids and provide
continuity of service. 
164

Page 165

 The scoring of four Council Top Risks has increased:- 
 ‘Inability to take the necessary action due to funding constraints, to combat
climate change, and work toward achieving net zero carbon emissions by
2045, thereby contributing to negative and irreversible environmental, social
and economic impacts on the Council and its residents’ has increased from
15 to 20 and has also been reworded to reflect funding constraints and
difficulties faced by the Council in meeting climate change targets.
 ‘Increasing levels of adverse weather’ has increased from 9 to 16. This
reflects more frequent issues being encountered by the Council because of
weather-related events, including significant damage to Council properties
over recent years as a result of storms and burst pipes. Weather events are
also impacting upon the Council’s property insurance premiums and level of
uninsured excesses carried.
 ‘Fraud, theft, organised crime and cyber attacks’ has increased from 12 to
20. Whilst controls in this area have been assessed as adequate, the threat
landscape is very active at the moment and shows no signs of easing.
 ‘Lack of capacity and skills to meet increased service demands’ has
increased from 9 to 12 in light of shift in supply/demand and recruitment
difficulties. 
 The scoring of two Council Top Risks has decreased:- 
 The ‘Community Wealth Building Strategy’ risk score has been reduced from
16 to 9 to bring the score in line with risk for other plans and strategies.
 The risk score for ‘Implications of the Scottish Fire and Rescue Service
Unwanted Fire Alarm Signals Policy within the Council’s non-domestic
estate’ has reduced from 16 to 9 as claims history indicates that risk of fires
in the type of property concerned is low. 
 Some key risk descriptions have been updated to reflect the current status of
risks and/or to provide more straightforward and understandable risk
descriptions. 
5.6. Risks scored 15 to 25 are considered to be very high risks and risks scored 8 to 12
are considered to be high risks. Very high and high risks are monitored closely. The
top risks identified for the Resource, that is those that are residually scored as being
very high and high, are attached at Appendix 2. 
5.7. Appendix 3 provides a comparison of risk scores for 2023 and 2024. This appendix
also details any significant changes made to the risks. 
5.8. Risks evaluated residually as being medium or low risk will be monitored to ensure
that they continue to be adequately managed. 
5.9. The Committee is asked to note the contents of the Resource Risk Register. 
165

Page 166

6. Insurance Hotspots 
6.1. The Council appointed new buildings insurers in 2024. The immediate focus will be
on high value buildings and vacant properties. The eight recommendations from the
previous property insurer surveys in 2022 at Carnwath, Lesmahagow and Strathaven
were considered by the Security Co-ordinator. One recommendation was
implemented locally, the remaining seven have been deemed disproportionate and
the security arrangements in place at these properties are considered to be
satisfactory. 
6.2. The following areas of work have been progressed over the last year to mitigate
insurance hotspots. 
 Vehicle
  ‘Challenging Driver Behaviour’ learn online course for drivers launched via
management bulletin.
 Continued fact-finding investigations into accidents. 
 Combined Liability 
 A report detailing improvement actions following the health and safety/training
review has been received from the Council’s claims handlers, Gallagher
Bassett and an action plan is being prepared. 
 Roads and Transportation Services trial of Artificial Intelligence (AI)
technology associated with inspecting the roads network has ended and the
evaluation is currently ongoing. 
7. Scope and Appetite for Risk
7.1. The Council aims to be risk embracing, that is it will accept a tolerable level of risk in
seeking service efficiencies and in agreeing control measures. 
7.2. The level of risk facing the Council is measured both before (inherent risk) and after
(residual risk) consideration of controls. The Council should never carry a very high
residual risk exposure as this would indicate instability, but a low residual risk
exposure should also be avoided as this indicates lack of innovation. 
7.3. The Council’s ideal risk profile is defined within the Risk Management Methodology
as:- 
 No more than 10 per cent of residual risks at a very high level
 No more than 15 per cent of risks at a high level
 Around 50 to 60 per cent of residual risks at a medium level
 No more than 30 per cent of residual risks at a low level
166

Page 167

7.4. Table One below shows the top risks heat map, i.e. it details the total number of risks
for each individual residual risk score. Table Two below notes the overall risk profile
for the top risks. 
Table One – Community and Enterprise Resources Top Risks Heat Map 
Likelihood
5
Almost Certain 0 0 0 2 0
4
Likely 0 1 1 4 2
3
Possible 0 3 11 3 0
2
Unlikely 0 5 10 2 0
1
Rare 0 2 4 4 0  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
Table Two – Community and Enterprise Resources Top Risks Risk Profile 
Risk
Category
Risk
Rating
Number
of risks
Percentage of
risks
1 Very high 8 15%
2 High 18 33%
3 Medium 22 41%
4 Low 6 11% 
7.5. Despite the fact that the profile noted in Table Two is out with the ideal universal risk
exposure defined by the Risk Management Strategy, this risk exposure is reasonable
given the number of high-level risks currently being faced by the Resource. 
7.6. The risk tolerance levels have been updated as part of the review of the Risk
Management Strategy to provide a better balance on previously set levels and
acknowledge requirement to accept a higher level of risk. This will take effect in
2025. 
7.7. Community and Enterprise Resources has ensured that all inherent risks scored at a
very high and high level have cost effective control measures in place. Where further
control measures are required, these are included within the Resource risk control
plan. 
8. Risk Control Actions
8.1. Two risk control actions due for completion during 2023/2024 have been completed.
100% (2/2) of these risk control actions were completed on time against an overall
Resource target of 90%. No risk control actions have been identified for 2024/2025.
167

Page 168

9. Major Projects, Partnerships or Change
9.1. Within Community and Enterprise Resources, 25 partnerships have been identified.
Five of these are considered to be high risk, these are the Clyde Gateway
Partnership, SPT, City Deal, Climate Ready Clyde Partnership and Business
Gateway. The remaining twenty partnerships have been assessed as being low risk. 
9.2. Appropriate risk management arrangements are in place for the high-level
partnerships. 
10. Next Steps
10.1. The Resource Risk Management Group will continue to meet as required. The Risk
Register will be reviewed on an ongoing basis by the Group to ensure that risks
remain valid for the appropriate Service areas and to identify new areas of risk that
affect the Resource. An update report will be provided to Committee on an annual
basis. 
11. Employee Implications
11.1. Time will be required by the Resource Risk Management Group in the management
of the Resource Risk Register and Risk Control Plan. 
12. Financial Implications
12.1. There are no direct financial implications associated with the Council’s top risks.
There are a number of proposed risks which are classified under the heading of
financial. Where this is the case, the appropriate controls and actions have been
included in the risk control cards and progress will be monitored. 
13  Climate Change, Sustainability and Environmental Implications 
13.1. There are no direct implications associated with the Council’s top risks. There are a
number of proposed risks which are classified under the heading of Environmental.
Where this is the case, the appropriate controls and actions have been included in
the risk control cards and progress will be monitored. 
13.2. Sustainable development issues are included within the Council’s top risk register as
a standalone top risk and also through risks being linked directly to the Council Plan
outcomes ‘Caring, connected, sustainable communities’ and ‘Good quality, suitable
and sustainable places to live’. 
14. Other Implications
14.1. Failure to demonstrate that risk is actively considered and managed cannot only lead
to avoidable financial loss but could also affect delivery of services and could affect
the Resources’ reputation. 
15 Integrated Impact Assessment and Consultation Arrangements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to existing policy, function, or strategy and therefore, no impact assessment
is required. 
15.2. Consultation on the content of this report has been undertaken with members of the
Community and Enterprise Resources Risk Management Group. 
168

Page 169

David Booth
Executive Director 
5 November 2024   
Link(s) to Council Values/Priorities/Outcomes
Values
 Accountable, effective, efficient, and transparent   
Previous References
 Community and Enterprise Resources Committee – 7 November 2023 - Annual
update on Resource Risk Register and Risk Control Action Plan 
List of Background Papers
 Figtree extracts (risk register and risk control action plan) 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Gayle Forrest, Support Team Leader Tel:  via MS Teams
E-mail:  gayle.forrest@southlanarkshire.gov.uk
169

Page 170

Appendix 1 – Risk scoring matrix and likelihood and impact definitions 
Likelihood 
Score 1 2 3 4 5
Description Rare   Unlikely  Possible  Likely Almost
certain 
Likelihood
of
occurrence
1 in 10 years 1 in 3 years 1 in 2 years Annually Monthly
Probability
of
occurrence
The event
may occur in
certain
circumstance
The event
could occur
The event
may occur
The event will
probably
occur
The event is
expected to
occur or
occurs
regularly 
Impact 
Reputation Financial Service
delivery/
Time to
recover
Compliance Safety
1
Negligible
Public
concern
restricted to
local
complaints
<£50,000 per
annum
No impact to
service quality;
limited
disruption to
operations.
No external
interest
Minor
injury –
no lost
time
2
Minor
Minor adverse
local/public/m
edia attention
and
complaints
£50,000-
£250,000 per
annum
Minor impact to
service quality;
minor service
standards are
not met; short
term 
Very minor
attention from
legislative
/regulatory
body
Minor
injury –
resulting
in lost
time
3
Moderate
Adverse
national
media
Public
attention
£250,000 to
£500,000 per
annum
Significant fall in
service quality;
major
partnership
relationships
strained; serious
disruption in
service
standards
Short-term
attention from
legislative/
regulatory
body 
Major
injury or
ill health
resulting
in lost
time
4
Major
Serious
negative
national or
regional
criticism
£500,000 to
£1million per
annum
Major impact to
service delivery;
multiple service
standards are
not met; long
term disruption
to operations;
multiple
partnerships
affected
Medium-term
attention from
legislative/
regulatory
body 
Fatality;
Or
injuries to
several
people
170

Page 171

5
Catastrophic
Prolonged
international,
regional and
national
condemnation
>£1million
per annum
Catastrophic fail
in service
quality and key
service
standards are
not met; long
term
catastrophic
interruption to
operations;
several major
partnerships are
affected
National
impact with
rapid
intervention
of legislative/
regulatory
body 
Multiple
fatalities;
Or
injuries to
large
number
of people 
The assessments for impact and likelihood combine to provide an overall inherent risk
score on the scale of between 1 and 25, using the Council’s recognised risk matrix. 
Risk matrix
Likelihood
5
Almost Certain 5 10 15 20 25
4
Likely 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Unlikely 2 4 6 8 10
1
Rare 1 2 3 4 5  
1
Negligible
2
Minor
3
Moderate
4
Major
5
Catastrophic  
Impact 
The risk score is calculated as follows: 
Likelihood score x Impact score = Risk Score 
171

Page 172

Appendix 2
Community and Enterprise Resources Risk Register (as at August 2024) – 
Extract of risks with residual score category of Very High and High 
Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
1
Very High
(15-25) 
The Budget Gap that the Council is facing
across the medium term is the biggest risk
faced by the Council. The Budget Gap is
the result of the continued real terms
reduction in Government funding as well
as the increased demand and increased
cost of services including the significant
impact of price increases on areas such as
inflationary increases on utilities, and
increased staff costs due to pay awards.
Reduced fees/income received by the
Council would add to budget pressures
across Services
Council Top Risk 
25
Very high
• Reports prepared to Council timetable and
reported to Finance and Community and
Enterprise Resource Committee to provide
assurances that income and expenditure is
within budget and regular updates provided
to Executive Director Finance and
Corporate 
• Robust arrangements in place to monitor
service delivery outturns against budgets
• Implications of changes to service provision
managed through consultation, impact
assessments and Trade Union negotiation 
• Promotion of new/updated policies via
Website, Press, Social media etc.
• Management of outsourced work including
regular contractor meetings as appropriate
20 
Very high
The Council, in conjunction with its
partners, is unable to provide the requisite
contribution to reducing the overall impact
of the costs of living crisis on households
in South Lanarkshire, resulting in
increased poverty, debt and poorer
outcomes for people  
Council Top Risk 
25
Very high 
• Provision of support to local business by
Economic Development
• Increased School Meal provision / breakfast
clubs 
• Resourcing and support to the provision of
‘Warm Spaces’ hubs in Lifestyle Centres/
Libraries and other council properties 
20
Very high 
172

Page 173

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
Fraud, theft, organised crime and cyber-
attacks
Council Top Risk 
25
Very high 
• Community and Enterprise Resource Fraud
risk register in place and updated annually.
• Fraud, Cyber / Information security Training
Learn on Line Modules; mandatory for all
employees
20
Very high 
Inability to take the necessary action due
to funding constraints, to combat climate
change, and work toward achieving net
zero carbon emissions by 2045, thereby
contributing to negative and irreversible
environmental, social and economic
impacts on the Council and its residents
Council Top Risk 
25
Very high 
• Sustainable development and climate
change is mainstreamed across the Council
and associated Plans, Policies and
Strategies
• Implementation of the Council's
Sustainable Development and Climate
Change Strategy and Carbon Management
Action Plan 
• A long-term capital programme that tackles
climate change mitigation and adaptation 
• The preparation of a pipeline of climate
change and mitigation and adaptation
projects to attract investment/funding
• Active membership in Climate Ready Clyde
regional adaptation partnership 
20
Very high 
The council fails to comply with its
statutory duties by not conducting
sufficiently robust impact assessments
where the same are required in respect of
budget/service redesign proposals, leading
to potential legal and financial challenges,
which could result in failure to deliver
those proposals 
Council Top Risk 
20
Very high
• Implementation of consistent Integrated
Impact Assessment approach throughout
the council 
• Training given to relevant officers on the
Integrated Impact Assessment approach
• Integrated Impact Assessments signed off
in Resources by Executive Director/Head of
Service
• Peer Review process established for more
notable proposals that require an Integrated
Impact Assessment, including for budget
16
Very high
173

Page 174

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
related options
The provision of council services is
disrupted because of industrial action 
Council Top Risk 
20
Very high
• Operational services have plans in place to
address the impact of the industrial actions
once they end
• Strike protocols in place to manage action
and communication
16
Very high 
The Council inherits commercially unviable
shopping centres due to the financial
failure of existing owner/management
companies resulting in significant financial
and operation liabilities for the Council
Council Top Risk 
20
Very high 
• Independent advisers acting on behalf of
the Council to oversee property
management decisions by private owners/
management companies
• Consultants appointed to advise on the
current condition of the Centres and
potential costs
• Specialist legal advice on all aspects
• Project management team to lead technical
delivery of the project for elements such as
demolition 
16
Very high 
Increasing levels of adverse weather
Council Top Risk 
20
Very high 
• Council wide Emergency Planning
arrangements, Duty Manager, standby rota,
dedicated Flood Risk Management team
and weather forecasting systems in place
• Effective management of existing budget
resources through regular reporting and
dialogue with Exec Dir Finance and
Corporate
• Remote monitoring of high-risk flood sites
using flood cameras/telemetry solutions
• Winter weather procedures, Winter Service
Policy and Ops manual 
• Pothole inspection and pro-active
rectification programme using sub-
16 
Very High 
174

Page 175

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
contractors during extended severe
weather 
2
High
(8-12) 
The council does not have the appropriate
emergency/business continuity plans;
contingency arrangements or partnerships
in place to respond to/or recover from a
pandemic/endemic event
Council Top Risk 
25 
Very high 
• The ability to adapt funding to support
community and third sector groups, e.g.
government support provided via additional
funding to support vulnerable groups,
hardship funds etc. 
• Business Continuity Plan developed to
facilitate the continued delivery of safety
critical Priority 1 Services, the plan also
facilitates the delivery of priority 2 services
as far as practicable and priority 3 services
as far as resources allow     
• Budget monitoring and re-alignment in
place for lines that could potentially be
affected by loss of income
12
High 
Information governance not subject to
adequate control
Council Top Risk   
20
Very high
• Compliance with Information Governance
Strategy
• Retention schedules
• Electronic Content Management System
(ECM)
• Completion of annual information
Governance checklist
12 
High 
Lack of capacity and skills to meet
increased service demands
Council top risk   
20
Very high 
• Performance Appraisal (PA) process
including service learning and development
priorities and employee training plans 
• The Workforce strategy provides greater
level of organisational control rather than
service/resource specific and has a focus
on agile working. 
• Management Development and Leadership
12 
High 
175

Page 176

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
Challenge Programme 
• Stress audit tool 
• Effective partnership working with Trade
Unions   
Failure to work effectively with the private
sector to support local businesses, town
centres and the rural economy 
16 
Very high
• Support to Business Improvement Districts,
town centres and other partnerships via
numerous channels include the ‘Invest in
South Lanarkshire’ website and
management of the Supplier Development
Programme including strategic
development and delivery of events,
training and e-commerce
• Regular operational and steering group
meetings and ongoing liaison with
partnership authorities (e.g. Clyde
Gateway, Lanarkshire Area Tourism
Partnership)
• Implementation of the Community Led
Local Community Fund (CLLD), Community
Benefit funding in rural area with
appropriate funding in line with relevant
(e.g. rural) strategies, and the Business
Loan Scotland
12
High 
The Council fails to deliver Town Centre
Masterplans 
15
Very high
• Options appraisals being undertaken 
• Extensive public consultation 
• Specialist legal advice on all aspects
12
High 
Implications of the Scottish Fire and
Rescue Service Unwanted Fire Alarm
Signals Policy within the Council's non-
domestic estate
Council Top Risk 
25
Very high
• Housing and Technical Resources and
Finance and Corporate Resources review
of existing alarm systems within affected
non-domestic premises
• Report to CMT with recommendations to
enable investment works to reprogramme
9 
High 
176

Page 177

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
or replace systems so that confirmation of a
fire can be provided as quickly as possible   
• Fire investigation plans in place for CER
premises 
The Council fails to deliver the objectives
of the Community Wealth Building
Strategy
Council Top Risk 
20 
Very high
• Supplier Development Programme provides
training to businesses on how to bid for
contracts/meet the buyer events
• Work with Scottish Enterprise, Scottish
Development International and Glasgow
City Region partners to raise the profile of
investment opportunities
• Support is provided to all businesses
through the council’s Business Support
Team and Business Gateway Lanarkshire
service  
• Reporting schedule in place to monitor
progress through Sustainable Development
and Climate change Strategy 
9 
High 
Inability to maintain infrastructure, assets
and properties in a safe and well-
maintained condition that will avoid
unplanned closure, due to budget
constraints and failure to achieve
objectives of asset and property reviews
Council Top Risk 
20
Very high
• Programme of carriageway upgrading to
improve the road condition being
undertaken - progress monitored closely
through iMPROVE
• Regular monitoring by Roads,
Transportation and Fleet managers of
progress and budgets
• Improvements to road related infrastructure
using Roads Investment Programme and
external funding
• Implement and maintain enhanced
structural monitoring of bridges and
structures
9
High
177

Page 178

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
• Maintain list of qualifying bridges and
structures
• Implement appropriate reactive mitigation
measures when need for repairs to road
infrastructure identified
• Option to close road if absolutely necessary
• Assessment of properties utilised by SLLC
to prioritise investment available from
Capital Programme 
IT development, functionality and
implementation of new systems does not
support service delivery to secure
efficiencies
Council Top Risk 
20
Very high 
• Service IT requirements restricted to reflect
available resources  
• IT service plan closely monitored and
progress reports issued to Service
managers 
9
High 
Ash Dieback Disease  20 
Very high
• Raising awareness of ash dieback and the
issues it may cause
• Preparing and implementing an Ash
Dieback Action Plan
• Assisting with recovery of landscape and
infrastructure affected by ash dieback 
9
High 
Failure to secure external funding,
effectively manage funds/maximise
investment and failure to agree/implement
derelict/contaminated land programme 
16 
Very high
• Corporate Management Team approval
process for external funding
• Delivery of derelict/contaminated land
action plans
• Funding and compliance section investigate
all methods of external funding
9
High 
Inability to ensure public protection and
safety   
Council Top Risk 
16 
Very High 
• Responsive public health service and
inspection programme in place including
food hygiene, health and safety
enforcement and advisory service,
contaminated land and air quality, private
9 
High 
178

Page 179

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
sector housing stock, response to public
health emergencies
• Ongoing review of contaminated land
strategy and maintenance of register of
contaminated land
• Agreed programme of business
compliance visits and Health and Safety
Welfare inspections and follow up visits
carried out throughout the year, targets for
inspections set and closely monitored with
any new legislation arising from public
health emergencies
• Partnership working with Police Scotland
and National Health Service
• Raising awareness of current scams and
frauds being perpetrated in the local
community 
Impact of Waste Management market
changes
• Changes to global economic policy
changes resulting in market collapse
and inability to dispose of recycled
products 
12 
High
• Market changes monitored through waste
industry network groups and via meetings
with contractors
• Contracts include contingency
arrangements including back up provision
for alternative suppliers
• Operational monitoring process in place  
• Waste Awareness Team – ongoing
initiatives to promote and improve levels of
domestic recycling
9
High 
The Council fails to deliver the outcomes
of the Economic Strategy
Council Top Risk   
12
High
• Increase the level of procurement spend
with local business and social enterprises
and support local recruitment by local
businesses and social enterprises
• Influence activity and skills investment to
9
High
179

Page 180

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score 
address skills gaps and the skills needs
that have been identified as our economy
grows and evolves
• Work with partners to improve resilience,
particularly in areas of greatest deprivation
• Utilise our property assets and work with
private sector landowners and developers
to maximise sustainable development
opportunities in our area
• Secure sufficient financial resources
through our External Funding team with
specific focus on emerging Scottish and UK
Government funding streams
• Work with business to improve productivity
and innovation through progressive
workplace policies 
Insufficient Waste Processors to secure
competitive bids and provide continuity of
service 
12
High
• Reviewing the market
• Waste Managers Network 
• Soft market testing/engagement
• Publishing a Prior Information Notice in
order to encourage tender submissions
9 
High 
Failure to ensure the health, safety and
wellbeing of employees and the protection
of service users and members of the
public in the delivery of council services
Council Top Risk   
20 
Very high 
• Occupational Health and Safety
Management System embedded
throughout the Council 
• Risk Assessments and Safe Systems of
Work developed and implemented
(including for agile working/working at
home) 
• Resource, Service and Trade Union
communication and consultation
arrangements in place
• Health and Safety Training matrices
8
High 
180

Page 181

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
(Specific training requirements for
employees at Service level within the
Council)
• Programme of Health and Safety Audits
and Inspections undertaken 
Failure to achieve the outcomes of the
Community Plan 2022-2032
Council Top Risk 
20
Very high 
• Partners signed up to Community Plan
2022-2032 and have agreed to mainstream
the Sustainable Development Goals into
the work of the Partnership
• Governance arrangements via the
Community Planning Partnership Board
• Regular progress reporting to Resource
Management Team/Corporate
Management Team/Committee 
• Community Planning Risk Register
maintained and monitored
8
High 
Failure to achieve the outcomes of the
Council Plan.
Council Top Risk   
16
Very High
• Annual performance reporting 
• Governance arrangements via the
Executive Committee, Performance and
Review Forum and Community and
Enterprise Resource Committee
8
High 
Increased costs providing winter
maintenance
• Failure to provide essential services
during periods of extreme winter
weather   
12 
High
• Effective management of existing budget
resources through regular reporting and
dialogue with Executive Director Finance
and Corporate
• Salt stocks and storage capacity
• Winter weather procedures, winter service
policy and operations manual 
• Daily winter task force meetings held during
periods of extreme weather to ensure
service delivered in most efficient and
effective way
8
High
181

Page 182

Risk
Category
Key risk Inherent
Risk Score
Sample of Controls Residual
Risk Score
• Implementation of the actions arising from
the review of winter maintenance 
182

Page 183

Appendix 3 – Comparison of the 2023 and 2024 Resource Risk Register 
Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
Very High The Budget Gap that the Council is
facing across the medium term is
the biggest risk faced by the
Council. The Budget Gap is the
result of the continued real terms
reduction in Government funding
as well as the increased demand
and increased cost of services
including the significant impact of
price increases on areas such as
inflationary increases on utilities,
and increased staff costs due to
pay awards. Reduced fees/income
received by the Council would add
to budget pressures across
Services
Council Top Risk 
20 20 = Reworded to recognise the
significant budget reductions /
savings needed to meet the
requirement to deliver a balanced
budget 
The Council, in conjunction with its
partners, is unable to provide the
requisite contribution to reducing
the overall impact of the costs of
living crisis on households in South
Lanarkshire, resulting in increased
poverty, debt and poorer outcomes
for people   
Council Top Risk  
20 20 = Reworded to reflect the Council
works in conjunction with partners 
183

Page 184

Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
Inability to take the necessary
action due to funding constraints, to
combat climate change, and work
toward achieving net zero carbon
emissions by 2045, thereby
contributing to negative and
irreversible environmental, social
and economic impacts on the
Council and its residents
Council Top Risk 
15 20  Reworded and scoring increased to
reflect funding constraints and
difficulties faced by the council in
meeting climate change targets
Fraud, theft, organised crime and
cyber-attacks
Council Top Risk 
12 20  Scoring increased to reflect the
threat landscape is very active at
the moment and shows no signs of
easing
The provision of council services is
disrupted because of industrial
action 
Council Top Risk 
16 16 = 
Increasing levels of adverse
weather
Council Top Risk 
9 16  Scoring increased to reflect the
more frequent issues being
encountered by the council as a 
result of weather-related events, 
including significant damage to 
council properties over recent years 
184

Page 185

Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
as a result of storms and burst
pipes 
Weather events are also 
impacting upon the council’s 
property insurance premiums and
level of uninsured excesses carried 
The council fails to comply with its
statutory duties by not conducting
sufficiently robust impact
assessments where the same are
required in respect of
budget/service redesign proposals,
leading to potential legal and
financial challenges, which could
result in failure to deliver those
proposals 
Council Top Risk 
NA 16 NEW RISK 
The Council inherits commercially
unviable shopping centres due to
the financial failure of existing
owner/management companies
resulting in significant financial and
operation liabilities for the Council
Council Top Risk   
NA 16 NEW RISK 
High  The council does not have the
appropriate emergency / business
continuity plans; contingency
arrangements or partnerships in
place to respond to/or recover from
12 12 = 
185

Page 186

Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
a pandemic/endemic event
Council Top Risk   
Information governance not subject
to adequate control
Council Top Risk  
12 12  = 
Failure to work effectively with the
private sector to support local
businesses, town centres and the
rural economy   
12 12 = 
The Council fails to deliver Town
Centre Masterplans     
NA 12 NEW RISK 
Lack of capacity and skills to meet
increased service demands
Council Top Risk   
9 12  Score increased to reflect an
increased shift in supply/demand
and recruitment difficulties 
Implications of the Scottish Fire
and Rescue Service Unwanted Fire
Alarm Signals Policy within the
Council's non-domestic estate
Council Top Risk   
16 9  Re-worded and score decreased to
reflect risk is mainly in respect of
property not life
Claims history indicates that risk of
fires in the type of properties
concerned is low 
The council fails to deliver the
objectives of the Community
Wealth Building Strategy
Council Top Risk   
16 9  Score decreased to bring in line
with risks for other plans and
strategies 
Impact of Waste Management 9 9 = 
186

Page 187

Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
market changes
• changes to global economic
policy changes resulting in
market collapse and inability
to dispose of recycled
products 
Inability to ensure public protection
and safety
Council Top Risk   
9 9 = Amended wording 
Inability to maintain infrastructure,
assets and properties in a safe and
well-maintained condition that will
avoid unplanned closure, due to
budget constraints and failure to
achieve objectives of asset and
property reviews
Council Top Risk   
9 9 = Amended wording 
IT development, functionality and
implementation of new systems
does not support service delivery to
secure efficiencies
Council Top Risk   
9 9 = Re-worded to include the
implementation of new systems 
which reflects the significant IT 
projects which continue to be 
progressed at present including 
Fusion 
Ash Dieback Disease  9 9 = 
The Council fails to deliver the
outcomes of the Economic Strategy
Council Top Risk  
9 9 = 
187

Page 188

Risk
Category
2024 Risk description 2023
Residual
risk
score
2024
Residual
risk 
score
Change in
residual risk
scores
Key changes 
Failure to secure external funding,
effectively manage funds/maximise
investment and failure to agree/
implement derelict/contaminated 
land programme  
9 9 = 
Insufficient Waste Processors to
secure competitive bids and
provide continuity of service   
NA 9 NEW RISK 
Failure to ensure the health, safety
and wellbeing of employees and
the protection of service users and
members of the public in the
delivery of council services
Council Top Risk   
8 8 = 
Failure to achieve the outcomes of
the Community Plan 2022-2032
Council Top Risk   
8 8 = 
Failure to achieve the outcomes of
the Council Plan
Council Top Risk 
8 8 = 
Increased costs providing winter
maintenance
• Failure to provide essential
services during periods of
extreme winter weather   
8 8 = 
188

Page 189

Report
Agenda Item 
Report to: Community and Enterprise Resources Committee
Date of Meeting: 26 November 2024
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Notification of Contracts Awarded: 1 April 2024 to 30
September 2024 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide notification in line with Standing Orders on Contracts to Committee of
all contracts awarded by Community and Enterprise Resources during the
period 1 April to 30 September 2024
1purpose] 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that details of the contracts awarded in Appendix A be noted; and
(2) that details of contracts extended in Appendix B be noted.
[1recs]
3. Background
3.1. It is a requirement of Clauses 21.8 and 22.5 of the Standing Orders on Contracts
that details of the acceptance of all tenders above £50,000 be reported
retrospectively to the relevant Committee for noting, other than those under Clause
21.3 where the award is not the lowest in a price only tender, or costs exceed the
approved financial provision.  In these instances, a report is submitted to the
appropriate Committee and subsequent authority to award is granted by that
Committee. 
4. Contract Awards
4.1. A full list of contracts awarded and extended is provided in the appendices A and B
of this report. 
5. Employee Implications
5.1. Contracts management including performance appraisal will be undertaken by both
the main user Services and Procurement. 
6. Financial Implications
6.1. There are no financial implications associated with this report which is for information
purposes only. Appropriate budgetary provision is available for each of the contracts
awarded.
18
189

Page 190

7. Climate Change, Sustainability and Environmental Implications
7.1. There are no climate change, sustainability or environmental implications in terms of
the information contained within this report. 
8. Other Implications
8.1. There is a risk that failure to report awards may lead to contracts being awarded that
do not represent best value, breach statutory procurement obligations and Standing
Orders or do not follow internal processes which mitigate the risk. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. This report does not introduce a new policy, function or strategy nor recommend a
change to an existing policy, function or strategy and therefore, no impact
assessment is required. 
9.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
David Booth
Executive Director (Community and Enterprise Resources) 
5 November 2024 
Link(s) to Council Values/Priorities/Outcomes
Values
 Accountable, effective, efficient and transparent
 Fair, open and sustainable 
Previous References
 None 
List of Background Papers
 Standing Orders on Contracts 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Emma Smith, Corporate Procurement and Transactions Manager
Ext:  5329 (Tel:  01698 455329)
E-mail: emma.smith@southlanarkshire.gov.uk 
190

Page 191

Appendix A 
Community and Enterprise Resources 
Contracts Awarded over £50,000 in value 
Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
John McGeady Ltd SLC/CE/23/097 £637,105.17 13/04/2024
NEC3 ECSC for Cuningar Loop Phase 3
(Allotments and Car Park)
08/04/24 -
29/07/24
Ayrshire Tree Surgeons
Ltd SLC/CE/23/189 £80,569.44 13/04/2024
Tree Surgeon - Works for Trees affected
by Ash Dieback Disease – Lots 1, 2 and
3
04/04/24 -
03/05/24
Allstar Business Solutions
Ltd
SLC/PS/COMENT/23/003 £4,680,000.00 13/04/2024
Direct Award for the provision of Fuel
Cards and Associated Services
11/04/24 –
31/03/2027
(extension
21/02/2028) 
J C Peacock & Co Ltd SLC/CE/23/152 £160,800.00 16/04/2024
Supply and Delivery of Bagged Salt for
Winter Road Maintenance
01/04/24 -
31/03/28
J H Civil Engineering Ltd
SLC/CE/23/144 £50,863.20 18/04/2024
Capital Footway Resurfacing Schemes-
Maxwellton Road and Vancouver Drive,
EK
15/01/23 -
09/02/23
Brakes SLC/CE/23/182 £1,000,000.00 18/04/2024
Direct Award for the Supply and Delivery
of Groceries and Provisions
01/05/24 -
30/04/25
Stepford Contracts Ltd SLC/PS/COMENT/23/019/1/009 £50,484.00 18/04/2024
Capital Footway Resurfacing Scheme-
Milford, EK
04/03/24 -
29/03/24
Hillhouse Quarry Group
Ltd T/A MacAsphalt SLC/PS/COMENT/23/019/2/003 £62,681.85 18/04/2024
Carriageway Resurfacing/Anti
Skid/Lining - A73 near Hyndford Bridge,
Lanark
22/03/24 -
24/03/24
J H Civil Engineering Ltd SLC/CE/23/139 £294,800.60 26/04/2024
Mini Comp - SLC NEC3 ECC Option B –
Tollbooth Lanark, Streetscape
22/06/24 -
13/09/24
Tarmac Building Products
Ltd 
SLC/CE/23/196 £125,000.00 29/04/2024
Supply and Delivery of Cold Permanent
Pothole Repair - Viafix
29/04/24 -
28/04/26
(extension
28/04/27) 
191

Page 192

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Fast Fixx Catering
Engineers Ltd SLC/CE/23/014 £979,000.00 22/05/2024
Repair, Inspection and Maintenance of
Commercial Catering Equipment
01/05/24 -
30/04/28
Ringo Limited
SLC/CE/23/188 £55,000.00 29/05/2024 Cashless Parking
31/05/24 -
30/05/27
(extension
30/05/28) 
P F Cusack (Tools
Supplies) Ltd SLC/CE/24/016 £115,240.00 17/06/2024
Supply and Delivery of Temporary Signs
and Associated Products
20/06/24 -
19/06/28
Covanburn Contracts Ltd
SLC/PS/COMENT/23/019/06/004 £326,284.24 18/06/2024
NEC3 ECSC for Scottish Government
Play Investment Programme -
Rutherglen and Cambuslang
22/07/24 -
27/09/24
Kiwa Ltd T/A Kiwa CMT SLC/CE/23/166 £60,000.00 24/06/2024
Structural Specialist Investigation of
Transmission Lighting Columns
05/06/24 -
04/06/28
Multiple Suppliers SLC/CE/24/014 £1,500,000.00 25/06/2024 Supply and Delivery of Vehicle Parts
14/06/24 -
31/03/25
Multiple Suppliers SLC/CE/24/015 £3,600,000.00 25/06/2024 Hire of Vehicles and Plant
14/06/24 -
20/02/26
Swarco Smart Charging
Ltd SLC/CE/23/200 £74,258.32 27/06/2024
Direct Award – EV Charging
Infrastructure Service Contract Renewal
01/03/24 -
31/12/25
Joseph Leckie & Sons
Contracts Ltd SLC/PS/COMENT/23/019/2/010 £80,890.00 11/07/2024
Hawbank Depot- 1 No 6 Man
Carriageway Patching Squad
15/07/24 -
30/08/24
Velocity UK Limited SLC/CE/24/019 £105,299.44 23/07/2024
Application of Rhinophalt Preservative
Road Treatment
29/07/24 -
06/09/24
John McGeady Ltd
SLC/CE/23/121 £4,430,957.80 24/07/2024
Planer and Paver Hire and Works with
Operator including Supplementary Plant
22/07/24 -
21/07/27
(extension
21/07/2030) 
Clearview Intelligence Ltd
SLC/PS/COMENT/22/139 £958,754.47 04/08/2024
Supply, Installation and Maintenance of
Traffic Counting Equipment
02/08/24 -
01/08/29
(extension
01/08/31)
Joseph Leckie & Sons
Contracts Ltd SLC/PS/COMENT/23/019/6/008 £109,584.75 13/08/2024
NEC3 ECSC for Donaldson Street,
Hamilton
16/08/24 -
31/10/24
Land Use Consultants Ltd                                                                                                                                                                                      SLC/CE/24/038 £65,462.96 15/08/2024 Outdoor Recreation and Adventure 12/08/24 -
192

Page 193

Contractor CRN Value of
Contract
Awarded
Date of
Award
Brief Description Contract Period
Tourism 31/01/25
Elveden Farms Ltd
SLC/CE/24/042 £277,955.90 20/08/2024 Supply and Delivery of Christmas Trees
08/08/24 -
31/12/26
(extension
31/12/28)
Multiple Suppliers SLC/CE/24/047 £1,030,050.00 20/08/2024
Supply, Delivery & Installation of
Commercial Catering Equipment
09/08/24 -
31/05/27
J H Civil Engineering Ltd
SLC/PS/COMENT/23/019/1/007 £2,018,965.84 27/08/2024 
Wellhall Rd / Woodfoot Rd / Hillhouse
Rd, A723 Strathaven Rd / B755 Mill Rd,
Woodfoot Rd / Laighstonehall Rd/
Gateside Street Junction Improvements
26/08/24 -
29/09/25
Advance Construction
(Scotland) Ltd SLC/CE/24/017 £5,054,488.79 04/09/2024 Hairmyres Park and Ride
05/09/24 -
27/06/25
Covanburn Contracts Ltd SLC/CE/23/021 £174,085.00 06/09/2024
Maintenance of 4 No. Structures on EK
Main Line
24/02/25 -
28/03/25
Leaseplan Uk Ltd SLC/CE/24/023 £384,025.03 13/09/2024 Contract Hire/Lease of Light Vehicles
01/08/24 -
31/07/25
Landcare Solutions
(Scotland) Ltd
SLC/PS/COMENT/23/019/6/006 £251,705.30 18/09/2024
NEC3 Engineering and Construction
Short Contract for McKirdy Park Play
Area, Community Garden and Outdoor
Gym
02/09/24 -
30/11/24
Zap Entertainment Ltd
SLC/CE/24/036 £348,000.00 26/09/2024 Christmas Lights Switch on Events
02/10/24 -
01/10/27
(extension
01/10/29) 
193

Page 194

Appendix B
Contract extensions awarded over £50,000 in value 
Contractor Contract Reference
Value of
Contract
Awarded
Value of
Extension Date of
Extension Brief Description Contract period
(as extended) 
Jobling Purser Ltd
SLC/PS/COMENT/21/070 £160,000.00  £14,799.35 15/04/2024
Supply and Delivery of Bitumen
Products
03/11/21 -
28/02/25
Glasdon UK Ltd
SLC/PS/COMENT/21/032 £279,980.00  £118,028.68 28/05/2024
Supply and Delivery of Bollards
and Verge Markers
30/05/22 -
30/11/25
P F Cusack
(Tools Supplies)
Ltd SLC/PS/COMENT/21/037 £120,000.00  £82,652.72 11/06/2024
Supply and Delivery of
Miscellaneous Roads Products
27/06/22 -
12/06/26
Mallatite Minor
Struct & Prod Ltd SLC/PS/COMENT/22/046 £230,000.00  £123,366.48 24/06/2024
Supply and Delivery of
Ultracrete M90 (Eprobed)
27/06/22 -
26/06/26
Liebherr Great
Britain Ltd SLC/CE/23/171 £75,060.00  £37,530.00 27/06/2024 Hire of a Material Handler
01/01/24 -
31/12/24       
Huws Gray Ltd
SLC/PS/COMENT/21/036 £560,000.00  £304,724.87 28/06/2024
Supply and Delivery of
Drainage Products
01/08/22 -
31/07/26
Storm
Environmental Ltd SLC/CE/23/184 £167,250.00  £30,000 22/08/2024
Supply and Delivery of
Communal Recycling Bins
14/03/24 -
01/04/25
Karen Yuill
Recovery Ltd SLC/PS/COMENT/20/002  £325,000.00  £117,447.00 26/08/2024
The Provision of Vehicle
Breakdown Recovery Services
08/09/21 -
31/08/26 
194