Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 09 August 2022 
Dear Councillor 
Clydesdale Area Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 17 August 2022
Time:  14:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Catherine McClymont (Chair), Ross Gowland (Depute Chair), Alex Allison, Ralph Barker, Poppy
Corbett, Lynsey Hamilton, Mark Horsham, Ross Lambie, Richard Lockhart, Eileen Logan, Julia
Marrs, Ian McAllan, David Shearer
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Clydesdale Area Committee held on 22 June 2022
submitted for approval as a correct record.  (Copy attached) 
3 - 6 
Item(s) for Noting 
3 Police Scotland
Presentation by Chief Inspector Tony Gallagher and Inspector Paul Doyle. 
4 Participatory Budgeting - Community and Enterprise Resources -
Footways
Report dated 21 July 2022 by the Executive Director (Community and Enterprise
Resources).  (Copy attached) 
7 - 20 
Item(s) for Decision 
5 Community Grant Applications
Report dated 25 July 2022 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
21 - 24 
Urgent Business 
6 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385 370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
2

Page 3

CLYDESDALE AREA COMMITTEE 
Minutes of meeting held via MS Teams and in the Banqueting Hall, Council Offices, Almada Street,
Hamilton on 22 June 2022 
Chair:
Councillor Catherine McClymont 
Councillors Present:
Councillor Alex Allison, Councillor Poppy Corbett, Councillor Ross Gowland (Depute), Councillor
Lynsey Hamilton, Councillor Mark Horsham, Councillor Ross Lambie, Councillor Julia Marrs,
Councillor Ian McAllan, Councillor David Shearer 
Councillors’ Apologies:
Councillor Ralph Barker, Councillor Richard Lockhart, Councillor Eileen Logan 
Attending:
Finance and Corporate Resources
C Lyon, Administration Officer; L Wyllie, Administration Assistant 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Marrs 
Community Grant Applications:-
♦ Kirkfieldbank Homing and Sporting Club,
Lanark (CL/1/22)
♦ St Nicholas Pre School Playgroup, Lanark
(CL/11/22)
♦ Lanark and District Archaeological Society,
Lanark (CL/13/22) 
Known to group 
Known to group 
Known to group 
McClymont ♦ Cargill House Club, Lanark (CL/8/22) Member 
2 Playscheme Grant Applications 
A report dated 25 May 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on an application received from Lanark Universal Connections (PS/CL/1/22) for a
playscheme grant for 2022/2023. 
Playscheme funding allowed an allocation of £600 to be made to playschemes that operated
over the summer, October and Easter holiday periods with £400 for the summer period only and
£100 for each of the October and Easter periods.   
Financial provision was available for individual playschemes to receive, as appropriate, Travel
and Freedom passes from Strathclyde Partnership for Transport (SPT). 
The Committee decided: that a playscheme grant of £600 be awarded to Lanark
Universal Connections. 
[Reference: Minutes of 8 June 2021 (Paragraph 4)]
2
3

Page 4

3 Community Grant Applications
A report dated 6 June 2022 by the Executive Director (Finance and Corporate Resources) was
submitted on:- 
 applications for community grants to be met from the 2022/2023 budget
 6 community grant applications which had been dealt with by the Executive Director
(Finance and Corporate Resources), in consultation with the Chair, during the period from
15 February to 31 March 2022 to ensure that the 2021/2022 budget was utilised as fully as
possible 
The Committee decided: 
(1) that community grants be awarded as follows:- 
(a) Applicant: Kirkfieldbank Homing and Sporting Club, Lanark (CL/1/22) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £270 
Councillor Marrs, having declared an interest in the above application, withdrew from
the meeting during its consideration 
(b) Applicant: Scottish Retired Teachers’ Association – Clydesdale Group,
Braidwood (CL/2/22) 
Purpose of Grant: Outing and entrance fees 
Amount Awarded: £250 
(c) Applicant: Elsrickle Women’s Rural Institute, Biggar (CL/4/22) 
Purpose of Grant: Outing 
Amount Awarded: £200 
(d) Applicant: Clydesdale Community Concert Band, Carluke (CL/5/22) 
Purpose of Grant: Equipment 
Amount Awarded: £720 
(e) Applicant: Barn Buddies Community Interest Company, Carluke
(CL/6/22) 
Purpose of Grant: Start-up costs - Equipment 
Amount Awarded: £250 
(f) Applicant: Wild Things Scotland Community Interest Company, Biggar
(CL/7/22) 
Purpose of Grant: Equipment and materials 
Amount Awarded: £600 
(g) Applicant: Cargill House Club, Lanark (CL/8/22) 
Purpose of Grant: Outing 
Amount Awarded: £200 
Councillor McClymont, having declared an interest in the above application, withdrew
from the meeting during its consideration.  Councillor Gowland took the Chair for this
application only 
(h) Applicant: Abington Bowling Club (CL/9/22) 
Purpose of Grant: Equipment 
Amount Awarded: £300
4

Page 5

(i) Applicant: Crawfordjohn Public Hall Association (CL/10/22) 
Purpose of Grant: Equipment 
Amount Awarded: £500 
(j) Applicant: St Nicholas Pre School Playgroup, Lanark (CL/11/22) 
Purpose of Grant: Materials 
Amount Awarded: £480 
Councillor Marrs, having declared an interest in the above application, withdrew from
the meeting during its consideration 
(k) Applicant: Leadhills Silver Band (CL/12/22) 
Purpose of Grant: Materials 
Amount Awarded: £500 
(l) Applicant: Lanark and District Archaeological Society, Lanark (CL/13/22) 
Purpose of Grant: Outing and entrance fees 
Amount Awarded: £250 
Councillor Marrs, having declared an interest in the above application, withdrew from
the meeting during its consideration 
(2) that the action taken during the period 15 February to 31 March 2022 by the Executive
Director (Finance and Corporate Resources), in consultation with the Chair, to approve the
award of the following community grants from the 2021/2022 budget be noted:- 
(a) Applicant: Biggar and District Community Heritage, Biggar (CL/16/21) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £240 
(b) Applicant: Equitots Lanarkshire Community Interest Company, Carluke
(CL/21/21) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £325 
(c) Applicant: Lanark Men’s Shed (CL/22/21) 
Purpose of Grant: Start-up costs – Equipment and advertising costs 
Amount Awarded: £250 
(d) Applicant: Lanark and District U3A, Lanark (CL/23/21) 
Purpose of Grant: Outing and entrance fees 
Amount Awarded: £250 
(e) Applicant: Hawksland Women’s Rural Institute, Lesmahagow (CL/24/21) 
Purpose of Grant: Outing and entrance fees 
Amount Awarded: £250 
(f) Applicant: Lesmahagow Farmers’ Society (CL/25/21) 
Purpose of Grant: Administration and publicity costs 
Amount Awarded: £600 
[Reference:  Minutes of 15 February 2022 (Paragraph 6)] 
4 Urgent Business
There were no items of urgent business.
5

Page 6

6

Page 7

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 17 August 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Participatory Budgeting:  Footways 
1. Purpose of this Report
1.1 The purpose of the report is to:- 
 advise the Area Committee of the outcome and level of engagement for the
Participatory Budgeting (PB) consultation exercise to identify £2.500 million of
footway projects and next steps
[1purpose]
2. Recommendation(s)
2.1 The Committee is asked to approve the following recommendation(s): 
(1) that the outcome and level of engagement for the PB consultation exercise to
identify £2.500 million of footway projects, as set out in this report, be noted. 
3. Background 
3.1 Following the participatory budgeting investment in carriageway and footways
completed in 2021/2022, a second phase of investment has now been agreed that
will focus on the improvement of footways, making our towns and villages safer for
pedestrians, supporting healthy lifestyles through physical activity, and improving the
look and feel of our environment. 
3.2 £2.500 million ring-fenced investment in the Roads Capital Programme will support
footway improvements which are part of the adopted footway network.  This
investment will continue the Council’s commitment to prioritise investment in roads
and related infrastructure by directing additional funds to help improve the condition
of our footways. 
3.3 As was the case in 2021/2022 the split between geographical and operational areas
is largely based on the estimated footway network length. 
Operational
Area
Footway length
(Km)
Footway network
share (%)
Allocation
Clydesdale 498.70 20.5% £512,500
Hamilton 812.07 33.5% £837,500
East Kilbride 701.09 28.9% £722,500
Rutherglen &
Cambuslang 413.91 17.1% £427,500
Totals 2425.77 100.00% £2,500,000     
4
7

Page 8

3.4 Furthermore, to address concerns that the vote could be dominated by larger
population centres or more affluent/organised communities and using learning from
national and 2021/2022 PB exercise pilots, the process was again organised in
‘thematic options’ rather than specific streets/roadways. 
3.5 The public were asked to vote on the following themes they wished to see delivered
through this fund:- 
(1)  minor and residential footways
(2)  main and distributor footways
(3)  footways in business areas 
3.6 Last year there were both carriageway and footway themes put forward including
those unrelated to the public adopted road network (e.g. cemeteries, country parks). 
However, this year a more focused investment on footways that are part of/adjacent
to the public adopted road and footway network has been progressed. 
4. Consultation Outcomes
4.1 The consultation ran between 22 April and 5 June 2022 and was promoted via the
Council’s website, social media channels and third sector networks. 
4.2 Separate votes were held for each of the 4 Areas and each participant was allowed
multiple votes for the chosen themes.  Participants were able to apportion the votes
in any way they chose; for example, all 3 votes could be allocated to a single theme
or, at the other extreme, a single vote could be allocated to each of 3 themes. 
4.3  As was the case last financial year, rather than having only a single winning theme
the available funding was allocated across all themes. 60% of funding in an area was
allocated to the top scoring theme, 25 % to the second top theme and 15% to the
third-place theme. 
4.4 The proposed allocation of funding allows a proportion of the funding to be
distributed to all themes (and in turn priorities).  This provides the flexibility to
continue to target key priorities within each theme based on engineering merit rather
than to solely target all funds into one theme, while providing our communities with
the opportunity to influence spend across specific themes. 
4.5 This also represents best practice in terms of risk management as it gives the
service the ability to continue to target funds to those areas in greatest need with the
aim of improving those footways that are in the worst condition in the first instance. 
4.6 The results of the vote, are shown in Appendix 1 with numbers of votes cast in
brackets.  In each of the areas the first-place theme was minor and residential
footways, followed by main and distributor footways, and then footways in business
areas.   
4.7 The equalities information attached in Appendix 2 was collected from participants to
identify how representative the process was of the area profile of South Lanarkshire. 
Some participants opted not to leave their information so there is a discrepancy
between total participants and the information available below. 
4.8 In terms of participation several areas showed significant strength that should be
noted, namely:- 
8

Page 9

 83% of respondents fell under the category of working age (25-64).  This is a
harder to reach group and should be regarded as a sign of success for the
project 
 16% of respondents classified themselves as having caring responsibilities out
with parental responsibilities.  This showed significant representation from this
community 
 15% of respondents identified as having a long-term disability or illness which
showed good representation from this community 
 representation from SIMD 1 (Bottom 20%) considerably increased this year rising
from only 12% representation last year to 19% this year. 
4.9 In terms of participation, specific areas that stand out that require improvement in the
future to try and ensure the process is representative are: 
 Under 24’s – This could be due to the nature of the process but there was also no
specific targeted work done to engage this group.  Joint work to promote was
undertaken with the Education department, this requires further development 
 Ethnic Minorities – Improvement from last year was demonstrated in this area
with an increase to 1.5% representation.  This area still requires further
development 
 East Kilbride and Cambuslang and Rutherglen were both underrepresented in
this process.  More targeted work to engage residents in these areas may be
required. 
5. Next Steps
5.1 In line with the results of the vote, the funding has been allocated as set out below to
each of the areas and prioritised themes and specific named schemes have
subsequently been identified. 
Area 1st (60%) 2nd (25%) 3rd (15%) Totals
Clydesdale £307,500 £128,125 £76,875 £512,500
Hamilton £502,500 £209,375 £125,625 £837,500
East Kilbride £433,500 £180,625 £108,375 £722,500
Rutherglen &
Cambuslang £256,500 £106,875 £64,125 £427,500 
Totals £1,500,000 £625,000 £375,000 £2,500,000 
5.2 Appendices 3 to 6 sets out the specific schemes and indicative sums allocated to
each scheme.  These schemes have been identified using our scheme assessment
criteria which allows us to score potential footway schemes based on several factors,
which collectively contribute towards an overall score enabling us to prioritise our
resources.  This ensures that funds are targeted at those footways that are in
greatest need of repair based on engineering judgement. 
5.3 Schemes in Clydesdale are indicated at Appendix 6. 
5.4 It should be noted that these are provisional project estimates and there may be
some variance in terms of final outturn once more detailed design is undertaken and
works are completed. 
9

Page 10

5.5 As a result other projects may come forward should projects outturn under budget. 
Conversely, some projects may require to be deferred or supplemented from other
budgets if costs increase from the provisional estimates. 
5.6 Given an already full and challenging workload, and as already intimated to Elected
Members, to ensure delivery of both our core capital investment programme and the
participatory budget priority projects, it has been necessary to commence the
schemes prior to the August Area Committee cycle. 
5.7 An essential element of any participatory budgeting process is advising participants
of the outcome of the vote.  The Community Engagement Team will contact those
respondents who provided their email address to advise them of the successful
themes in each area with a link to a tracking area for PB on South Lanarkshire’s
website. 
5.8 The Community Engagement Team, with support from the Service, will also work
alongside the Corporate Communications/Digital Team to publicise the results
through the SL View and social media posts to raise awareness of both the process
and the results. 
5.9 Reports have been prepared for the four Area Committees to update Elected
Members on the voting process and the outcomes from it.  These reports are for
noting only given the budget allocation has been agreed as part of budget setting
process. 
6 Employee Implications
6.1 There are no employee implications at this time. 
7. Financial Implications
7.1 The intention is to spend the full £2.500 million during 2022/2023, however, market
conditions (e.g. contractor/material availability) are likely to result in some spend
moving into 2023/2024. 
7.2 Specific issues have emerged and are ongoing in relation to bituminous materials
due to the Ukraine/Russia conflict and a saturated market is also impacting on
contractor availability.  However, every effort will be made to deliver the projects
identified in appendices 3 through 6 during 2022/2023. 
7.3 In terms of an update on the 2021/2022 participatory budgeting programme for
footways, 29 projects within residential areas, town centres, country parks and parks
were identified and 26 were completed. 
7.4 The footway project in Chatelherault Country Park is expected to be undertaken
during 2022/2023 and is linked to the replacement of White Bridge and a feasibility
study is underway.  Work was also not fully completed and is continuing at
Calderglen Country Park.  These works are being progressed by colleagues in
Facilities, Grounds and Waste. 
7.5 An adopted footway project in Clydesdale was only partially completed due to
weather related issues and works are now programmed for 2022/2023.  Funding of
circa £0.120 million from 2021/2022 has, in addition to the share identified for
2022/2023, been made available to the Clydesdale Area.  A further £0.040 million is
also available from 2021/2022 for Hamilton schemes and this will be used to manage
inevitable cost variances. 
10

Page 11

7.6 For completeness, in addition to the PB funding discussed in this report, circa £1.000
million funding, has been allocated from the Roads Investment Programme for
prioritised footway improvements.  Specific schemes are shown at the bottom of
Appendices 3 through to 6 and it should be noted that the projects are similar in
terms of their alignment to the top two PB themes emerging from the PB exercises. 
8 Climate Change, Sustainability and Environmental Implications
8.1. There are no significant implications in terms of climate change, sustainability and
environmental implications associated with this report. 
9 Other Implications
9.1. There are no other significant implications as result of the contents of this report.   
10. Equality Impact Assessment and Consultation Arrangements
10.1.  There is no need to conduct an EIA and the consultation arrangements and results
are as set out in section 4. 
David Booth
Executive Director (Community and Enterprise Resources) 
21 July 2022 
Link(s) to Council Values/Priorities/Outcomes 
Values
Focused on people and their needs
Working with and respecting others
Accountable, effective, efficient, and transparent
Ambitious, self-aware, and improving
Fair, open and sustainable 
Priorities
We will work to put people first and reduce inequality
We will work towards a sustainable future in sustainable places
We will work to recover, progress, and improve 
Outcomes
Good quality, suitable and sustainable places to live
Thriving business, fair jobs and vibrant town centres
Caring, connected, sustainable communities
People live the healthiest lives possible 
Previous References
 7 September 2021 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Colin Park, Head of Roads, Transportation and Fleet Services 
Ext: 3653 (Tel: 01698 453653)
E-mail:  colin.park@southlanarkshire.gov.uk 
11

Page 12

Appendix 1 
Clydesdale (Overall 807 votes) 
1st Place: Minor / Residential – 475 (59%)
2nd Place: Main and distributor – 229 (28%)
3rd Place: Business areas – 103 (13%) 
Hamilton (Overall 1,023 votes) 
1st Place: Minor / Residential – 555 (54%)
2nd Place: Main and distributor – 289 (28%)
3rd Place: Business areas – 179 (18%) 
Rutherglen and Cambuslang (Overall 456 votes) 
1st Place: Minor / Residential – 294 (65%)
2nd Place: Main and distributor – 105 (23%)
3rd Place: Business areas – 57 (12%) 
East Kilbride (Overall 705 votes) 
1st Place: Minor / Residential – 433 (61%)
2nd Place: Main and distributor – 175 (25%)
3rd Place: Business areas – 97 (14%) 
12

Page 13

Appendix 2 
Locality - 997 
Locality No of
Participants
Percentage of
Participants
South Lanarkshire Area
Profile
East Kilbride 235 24% 30.00%
Hamilton 341 34% 32.00%
Clydesdale 269 27% 19%
Rutherglen
and Cambuslang
152 15% 19% 
SIMD 2020 – 951 Postcodes provided 
Decile Survey Engagement Percentage
of Participants
SL Area Profile
1-20% 180 19% 20%
21-40% 214 22.5% 23%
41-60% 224 23.5% 20%
61-80% 173 18% 20%
81-100% 158 17% 17% 
Age 
Age Survey Engagement Percentage of
Participants
SL Area Profile
Under 16 3 0% 18%
16-24 23 2% 10%
25-64 815 83% 82%
Over 65 136 14% 21%
Prefer not to answer 20 2% N/A 
Gender 
Gender Survey Engagement Percentage of
Participants
SL Area Profile
Female 686 69% 52%
Male 266 27% 48%
Prefer not to Answer 4 0% N/A
Other 41 4% N/A 
13

Page 14

Ethnic Background 
Ethnic Background Survey
Engagement
Percentage of
Participants
South Lanarkshire Area
Profile
White 932 94% 97.30%
Prefer not to answer 51 5% N/A
Asian, Asian Scottish, or Asian
British
3 0% 2.10%
Mixed/multiple ethnic groups 7 1% 0%
Arab 0 0% 0%
African, Carribean or black 1 0% 0.60%
Other ethnic group 3 0% 0% 
Sexual Orientation 
Sexual Orientation Survey Engagement Percentage of
Participants
South Lanarkshire Area
Profile
Heterosexual/Straight 795 80% 97%
Prefer not to answer 138 14% N/A
Gay/Lesbian 30 3% 2.20%
Bisexual 16 2% 0.80% 
Caring Responsibilities 
Caring Responsibility Survey Engagement Percentage of
Participants
South Lanarkshire Area
Profile
Children Under 18 435 44% 97%
Yes, other 158 16% N/A
No caring
responsibilities
336 34% 2.20%
Prefer not to answer 100 10% 0.80% 
Disabilities 
Disability Survey Engagement Percentage of
Participants
South Lanarkshire Area
Profile
Yes 152 15% 11%
No 755 76% 89%
Prefer not to answer 90 9% N/A 
14

Page 15

Appendix 3: Clydesdale 
Footways Participatory Budgeting Allocation (£) Theme
Theme 1, Minor / Residential (PB Budget £307,500) PB Underspend 21/22 £120,738    
Station Road, Law (funded from 2021-22 PB) 52,000 Minor / Residential
Wilton Road, Carluke Ph1 (part funded from 2021-22 PB) 184,211 Minor / Residential
Silverdale Crescent, Lanark 79516 Minor / Residential
Dale Street, Douglas 58000 Minor / Residential
Brownhill Avenue, Douglas 54511 Minor / Residential
Total 428,238  
Theme 2, Main / Distributor (PB Budget £128,125)    
Main Street, Forth (Kirk Green – Hawkwood) 72,195 Main and Distributor
Heathfield Drive, Blackwood 55,930 Main and Distributor
Total 128,125  
Theme 3, Business Areas (PB Budget £76,875)    
Bloomgate, Lanark 29,000 Business Areas
A721 Chapel Street, Carluke 30,000 Business Areas
St Leonard Street, Lanark 17,875 Business Areas
Total 76,875        
Other Footway, Service Capital (PB Budget   £205,600) Allocation (£) Theme
A70 Mainshill   100,987 Main and Distributor
Low Village Rd, Lamington 20,000 Minor / Residential
A706 Main Street, Forth  25,000 Main and Distributor
Whitehill Crescent, Lanark  59,613 Minor / Residential
Total 205,600  
15

Page 16

Appendix 4: Hamilton 
Footways Participatory Budgeting Allocation (£) Theme
Theme 1, Minor / Residential (Budget £502,500)    
Willow Drive, Blantyre                    104,500 Minor / Residential
Highfield Road, Larkhall                 90,000 Minor / Residential
Sycamore Grove, Blantyre            30,000 Minor / Residential
Avonbrae Crescent, Hamilton (North Side) 100,000 Minor / Residential
St Ninians Place, Hamilton             48,000 Minor / Residential
Selkirk Street, Blantyre                   50,000 Minor / Residential
Wilson Place, Stonehouse                             20,000 Minor / Residential
St Laurence Avenue, Stonehouse                      30,000 Minor / Residential
Sherry Drive, Hamilton                                  30,000 Minor / Residential
Total 502,500  
Theme 2, Main / Distributor (Budget £209,375)    
Bellshill Road -  Service Road            50,000 Main and Distributor
Carlisle Road, Ferniegair                 50,000 Main and Distributor
Main Street, Blantyre                     109,375 Main and Distributor
Total 209,375  
Theme 3, Business Areas (Budget £125,625)    
Central Avenue, Blantyre               125,625 Business Areas
Total 125,625        
Other Footway, Service Capital (Budget  £334,800) Allocation (£) Theme
Lime Grove, Blantyre 10,000 Minor / Residential
Larch Court, Blantyre 45,000 Minor / Residential
A723, Strathaven Road, Hamilton 99,400 Main and Distributor
16

Page 17

Bardykes Road, Blantyre 40,000 Main and Distributor
Darngaber Gardens, Quarter 40,000 Minor / Residential
Glenburn Avenue, Stonehouse 100,000 Minor / Residential
Total 334,400   
17

Page 18

Appendix 5: East Kilbride 
Footways Participatory Budgeting Allocation (£) Theme
Theme 1, Minor / Residential (Budget £433,500)    
Gilderdale, East Kilbride                                                                26000 Minor / Residential
Threshold, East Kilbride                                                               71280 Minor / Residential
Glen Cannich, East Kilbride                                                              32500 Minor / Residential
Newlands Rd, East Kilbride                                                              60000 Minor / Residential
Wellesley Dr, East Kilbride                                                              71000 Minor / Residential
Kype View, Strathaven                                                                  91000 Minor / Residential
Douglas St, Strathaven                                                                   30870 Minor / Residential
Applegarth Rd, Strathaven                                                            50850 Minor / Residential
Total 433,500  
Theme 2, Main / Distributor (Budget £180,625)    
High Common Rd, East Kilbride                                                                                                 59000 Main and Distributor
Kirktonholme Rd, East Kilbride                                                                                              30000 Main and Distributor
St Leonards Rd, East Kilbride                                                                                              51625 Main and Distributor
Newton Rd, Strathaven                                                                                                          40000 Main and Distributor
Total 180,625  
Theme 3, Business Areas (Budget £108,375)    
Colvilles Place, East Kilbride                                                                                                            83200 Business Areas
Thomson St, Strathaven                                                                                                                             25175 Business Areas
Total 108,375     
Other Footway, Service Capital   Allocation (£) Theme
A71 Darvel Road, Strathaven                  74000 Main and Distributor
Carnegie Hill, East Kilbride                        121,000 Minor / Residential
18

Page 19

Mungo Park, East Kilbride                          65000 Minor / Residential
Glen Morriston, East Kilbride                   33000 Minor / Residential
Bank Park, East Kilbride                            32000 Minor / Residential  
325,000 
19

Page 20

Appendix 6: Cambuslang and Rutherglen 
Footways Participatory Budgeting Allocation (£) Theme
Theme 1, Minor / Residential (Budget £256,500)    
Lettrickhills Crescent, Cambuslang                    25470 Minor / Residential
Cairns Road, Cambuslang                                                            55,000 Minor / Residential
Rosslyn Ave, Rutherglen                                                                56,550 Minor / Residential
Ryan Way, Rutherglen                                                                  33150 Minor / Residential
Calderwood Rd, Rutherglen                                                         60,080 Minor / Residential
Woodlands Crescent, Cambuslang                                                26,250 Minor / Residential
Total 256,500  
Theme 2, Main / Distributor (Budget £106,875)    
Dukes Road (from A724 uphill), Cambuslang                                                                           86,875 Main and Distributor
Hamilton Road, Cambuslang                                                                                20,000 Main and Distributor
Total 106,875  
Theme 3, Business Areas (Budget £64,125)    
Main Street, Rutherglen (streetscape repairs)                                     64,125 Business Areas
Total 64,125        
Other Footway, Service Capital Allocation (£) Theme
A749 East Kilbride Road, Cambuslang      69,000 Main and Distributor
Castlefern Road, Rutherglen               66,000 Minor / Residential
Total 135,000   
20

Page 21

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 17 August 2022
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for the allocation of community grants to 5 community groups in
the Clydesdale Area Committee area from the 2022/2023 community grant
budget 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that community grants be awarded as follows:- 
(a) Applicant:  Carluke Men’s Shed, Carluke (CL/14/22)   
Purpose of Grant:  Equipment   
Identified Community Benefits: Caring, connected, sustainable      
communitites   
Estimated Cost:  £450   
Total Eligible Grant Applied for: £450   
Recommendation:  £270   
Amount Awarded:  To be determined by the Committee 
(b) Applicant:  Lanarkshire Federation Scottish WI,      
Carnwath (CL/15/22)   
Purpose of Grant:  Outing   
Identified Community Benefits: Caring, connected, sustainable      
communities   
Estimated Cost:  £350   
Total Eligible Grant Applied for: £300   
Recommendation:  £300   
Amount Awarded:  To be determined by the Committee 
(c) Applicant:  Biggar Kirk – Gillespie Centre, Biggar      
(CL/16/22)   
Purpose of Grant:  Equipment   
Identified Community Benefits: Caring, connected, sustainable 
communities   
Estimated Cost:  £925   
Total Eligible Grant Applied for: £925   
Recommendation:  £555   
Amount Awarded:  To be determined by the Committee
5
21

Page 22

(d) Applicant:  ISKCON (Scotland) Limited,      
Lesmahagow (CL/17/22)   
Purpose of Grant:  Eqiupment, materials, administration and      
publicity costs   
Identified Community Benefits: Caring, connected, sustainable      
communities   
Estimated Cost:  £1,000   
Total Eligible Grant Applied for: £1,000   
Recommendation:  £600   
Amount Awarded:  To be determined by the Committee 
(e) Applicant:  Carnwath Agricultural Society, Carnwath      
(CL/18/22)   
Purpose of Grant:  Equipment, administration and publicity      
costs   
Identified Community Benefits: Caring, connected, sustainable      
communities   
Estimated Cost:  £945   
Total Eligible Grant Applied for: £945   
Recommendation:  £567   
Amount Awarded:  To be determined by the Committee 
cs]
3. Background
3.1. The Council operates a community grants scheme to support local constituted
community groups and voluntary organisations.  All applications require to be
supported by a constitution, audited accounts or annual income and expenditure
accounts, a bank statement, and confirmation that the group/organisation will adhere
to the conditions of the grant award. Applications are invited continually throughout
the year. 
3.2. The main aims of the community grants scheme are to:- 
 fund activities and projects which bring community benefit
 involve people in the community by bringing them together to enjoy educational,
recreational, leisure and other community activities or to improve the local
environment 
3.3. Support can be provided for a range of activities including administration and
publicity costs, purchase of equipment and materials, annual outings and entrance
fees, start-up costs and special events. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. The current position of the community for the Clydesdale Area Committtee area in
2022/2023 is as follows:- 
Total allocation for Community Grants £25,750
Grants previously allocated £5,120
Community grants allocated in this report £2,292
Remaining balance £18,338
22

Page 23

6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The risk to the Council is that grant funding is not utilised for the purpose of which it
was intended.  This risk is mitigated by internal controls including audit procedures
and conditions of grant agreement. 
8. Equality Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and therefore no impact
assessment is required. 
8.2. All the necessary consultation with the community groups has taken place. 
Paul Manning
Executive Director (Finance and Corporate Resources) 
25 July 2022 
Link(s) to Council Vision/Priorities/Values
♦ Accountable, effective, efficient and transparent.  Work with communities and partners
to promote high quality, thriving and sustainable communities 
Previous References
♦ Clydesdale Area Committee - 22 June 2022 
List of Background Papers
 Individual application forms 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jennifer Hilston, Clerical Assistant 
Ext:  4822  (Tel:  01698 454822)
E-mail:  jennifer.hilston@southlanarkshire.gov.uk 
23