Democracy Spraffa

Agenda Document Pack - Clydesdale Area Committee - 28/01/2026

South Lanarkshire Council · 28 January 2026
Back to Clydesdale Area Committee — 28 January 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 20 January 2026 
Dear Councillor 
Clydesdale Area Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 28 January 2026
Time:  14:00
Venue: Hybrid - Jerviswood Room, Memorial Hall, 13 St Leonard Street, Lanark,
ML11 7AB, 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Catherine McClymont (Chair), Ross Gowland (Depute Chair), Alex Allison, Ralph Barker,
Poppy Corbett, Lynsey Hamilton, Mark Horsham, Ross Lambie, Richard Lockhart, Eileen
Logan, Julia Marrs, Ian McAllan, David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Clydesdale Area Committee held on 29 October
2025 submitted for approval as a correct record. (Copy attached) 
3 - 6 
Item(s) for Noting 
3 Delivering a Lasting Impact - Routes to Work South Presentation
Presentation by N McNaughton, Deputy Chief Executive, Routes to Work South 
4 Common Good Update Report
Report dated 6 January 2026 by the Executive Director (Finance and Corporate
Resources).  (Copy attached) 
7 - 14 
5 Forward Programme for Future Meetings
Report dated 15 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
15 - 18 
Item(s) for Decision 
6 Community Grant Applications
Report dated 12 January 2026 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
19 - 22 
Urgent Business 
7 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385 370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
2

Page 3

CLYDESDALE AREA COMMITTEE 
Minutes of meeting held via Microsoft Teams and in the Jerviswood Room, Lanark Memorial Hall,
Lanark on 29 October 2025 
Chair:
Councillor Catherine McClymont 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Poppy Corbett, Councillor Ross
Gowland (Depute), Councillor Ross Lambie, Councillor Richard Lockhart, Councillor Eileen Logan,
Councillor Julia Marrs 
Councillors’ Apologies:
Councillor Lynsey Hamilton, Councillor Mark Horsham, Councillor Ian McAllan, Councillor David
Shearer 
Attending:
Education Resources
A French, Headteacher, Leadhills Primary School; M Hendry, Quality Link Officer; A Jessimer, Lead
Officer; K McDonald, Headteacher, High Mill Primary School; K Neil, Lead Officer
Finance and Corporate Resources
J Kerr, Community Engagement Manager; C Lyon, Administration Officer; I Mulholland, Community
Participation Development Officer; L Wyllie, Administration Assistant 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s) 
Marrs  Community Grant Applications
♦ The Royal Burgh of Lanark Community
Council (CL/16/25) 
♦ Kirkfield United Football Club (CL/20/25)
Ex officio Member of the
Community Council and
connection to
participants/recipients 
Connection to
participants/recipients 
Councillors Lockhart and McClymont made a transparency statement in relation to item 7 on the
agenda – Community Grant Applications, “The Royal Burgh of Lanark Community Council
(CL/16/25),” as they attended its meetings. 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Clydesdale Area Committee held on 20 August 2025 were
submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record.
2
3

Page 4

3 Education Scotland – High Mill Primary School, Carluke
A report dated 10 September 2025 by the Executive Director (Education Resources) was
submitted on the outcome of the inspection of High Mill Primary School, Carluke made by
Education Scotland. 
The inspection had taken place in June 2025 as part of a national sample of primary education
and the inspection letter reporting on the findings had been published on 9 September 2025. 
A number of particular strengths of the school had been highlighted in the inspection letter.  The
areas for improvement, agreed with the school and education authority, had been incorporated
into the school’s improvement plan and parents would be informed of progress. 
K McDonald, Headteacher and M Hendry, Quality Link Officer, having spoken on key aspects of
the report, were congratulated on the positive inspection report. 
The Committee decided: that the report be noted. 
4 Education Scotland – Leadhills Primary School
A report dated 11 September 2025 by the Executive Director (Education Resources) was
submitted on the outcome of the inspection of Leadhills Primary School made by Education
Scotland. 
The inspection had taken place in April 2025 as part of a national sample of primary education
and the inspection letter reporting on the findings had been published on 26 August 2025. 
A number of particular strengths of the school had been highlighted in the inspection letter.  The
areas for improvement, agreed with the school and education authority, had been incorporated
into the school’s improvement plan and parents would be informed of progress. 
A French, Headteacher and A Jessimer, Lead Officer, having spoken on key aspects of the
report, were congratulated on the positive inspection report. 
The Committee decided: that the report be noted. 
5 Community Engagement Team Update 2024/2025 
A report dated 15 October 2025 by the Chief Executive was submitted providing an update on
the work of the Community Engagement Team in Clydesdale between 1 April 2024 and 31
March 2025. 
Neighbourhood planning activity was first initiated in South Lanarkshire in 2017 and aimed to
tackle inequalities and improve outcomes for local people living in some of South Lanarkshire’s
most deprived areas. 
The Community Engagement Team was established in 2019 to develop community
empowerment and participation on behalf of the Council and deliver its duties within the
Community Planning Partnership (CPP).  The team had co-produced 9 neighbourhood plans in
South Lanarkshire’s areas that experienced inequalities.  A 10th plan, in East Kilbride South,
was currently in progress.  The CPP defined the areas as those featuring in the Scottish Index of
Multiple Deprivation (SIMD) in the top 20% of deprived communities or higher. 
The CPP did not currently undertake neighbourhood planning activities in the Clydesdale area. 
The partnership would review the neighbourhood planning areas through the Marmot Place
Programme.
4

Page 5

The wider Community Engagement Team continued to maintain contact with local groups and
organisations through information sharing with community representatives and was responsive
to queries and requests for support. 
For neighbourhoods in the locality that did not have allocated Participatory Budgeting (PB)
funding, the ‘Can Do Community Fund’ was a one-year Investment fund from the Council.  The
funding aimed to address specific needs and target projects identified through consultation with
local communities.  At its meeting on 1 May 2024, the Committee approved funding to various
groups, as outlined in paragraph 5.2 of the report. 
An additional Community Asset Transfer Liaison Officer was added to the team for the year
2024/2025 to support the high volume of concessionary asset transfers expected in the
Clydesdale Area.  The Officer was dedicated to supporting 22 asset transfer enquiries in the
area.  The post ended in March 2025. 
A total of 5 community asset transfer requests had been approved for transfer during this period,
as detailed in paragraph 6.3 of the report, and were currently undergoing completion. 
A total of 9 one-year concessionary leases, formerly known as CAT Light, had also been
approved during this period, as detailed in paragraph 6.4 of the report. 
Other projects that the team were involved in were:- 
 community wish list
 period positive in community venues
 community partnerships 
The Community Engagement Manager responded to members’ questions on various aspects
the report and was thanked for her comprehensive report.  The Community Asset Transfer
Liaison Officer and the Community Participation Development Officer were thanked for their
work in terms of Community Asset Transfers in the area. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 1 May 2024 (Paragraph 7)] 
6 Forward Programme for Future Meetings
A report dated 8 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on the outline forward programme for the meetings of Clydesdale Area
Committee to 9 September 2026. 
As part of future arrangements, members were invited to suggest topics for inclusion in the
Committee’s forward programme. 
The Committee decided: that the outline forward programme for the meetings of the
Clydesdale Area Committee to 9 September 2026 be
noted. 
[Reference:  Minutes of 20 August 2025 (Paragraph 7)] 
7 Community Grant Applications
A report dated 9 October 2025 by the Executive Director (Finance and Corporate Resources)
was submitted on 7 applications for community grant.
5

Page 6

The Committee decided: that community grants be awarded as follows:- 
(a) Applicant: Douglas Universal Connections Users’ Group (CL/11/25) 
Purpose of Grant: Entrance fees 
Amount Awarded: £210 
(b) Applicant: Lanark Agricultural Discussion Society (CL/15/25)
Purpose of Grant: Outing
Amount Awarded: £300 
(c) Applicant: The Royal Burgh of Lanark Community Council (CL/16/25) 
Purpose of Grant: Equipment, administration and publicity costs 
Amount Awarded: £600 
Councillor Marrs, having declared an interest in the above application, withdrew from the
meeting during its consideration 
(d) Applicant: Friends of Gowanpark, Crossford (CL/17/25) 
Purpose of Grant: Equipment 
Amount Awarded: £600 
(e) Applicant: Coalburn Homing Club (CL/18/25) 
Purpose of Grant: Materials, administration and publicity costs 
Amount Awarded: £300 
(f) Applicant: Forth Breast Cancer Support Group (CL/19/25) 
Purpose of Grant: Outing and entrance fees 
Amount Awarded: £350 
(g) Applicant: Kirkfield United Football Club, Lanark (CL/20/25) 
Purpose of Grant: Materials, administration and publicity costs 
Amount Awarded: £300 
Councillor Marrs, having declared an interest in the above application, withdrew from the
meeting during its consideration 
[Reference:  Minutes of 20 August 2025 (Paragraph 8)] 
8 Urgent Business
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 28 January 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Common Good Update Report 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 provide background information and an update on the Lanark and Biggar
Common Good funds
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the background information, and update on Lanark and Biggar Common
Good funds, be noted;
(2) that the accounts for Common Good for the year ended 31 March 2025
(section 6 and 7), be noted.
[1recs]
3. Background
3.1. The Common Good is a fund of money or assets or both and is administered by a
Scottish local authority in respect of each former burgh within the area of the local
authority. 
3.2. Common Good property is owned by the local authority although it is administered
separately from other local authority assets for accounting purposes.  Ownership is
absolute in the strict sense that the authority holds legal title to it.  However, what the
authority can do with the asset is subject to a system of statutory control.  This
control has the potential to limit the extent to which the authority can dispose of or
deal with the asset and on what terms. 
3.3. The Common Good funds held within South Lanarkshire Council are Lanark, Biggar,
Hamilton and Rutherglen.  The Biggar Common Good Account holds cash balances
only.  It does not hold physical assets.  The Lanark Common Good Account holds a
number of properties.  A proactive approach to maintenance supports the viability of
these assets and reduces the risk to greater liability in the future. 
3.4. The Council’s Finance and Corporate Resources (FCR) Committee, at its meeting on
2 October 2013, approved an annual cyclical maintenance plan of £15,000 for
Lanark Common Good properties.  The Executive Director (Finance and Corporate
Resources) has delegated authority to approve maintenance work up to the value of
£15,000 for each fund.  If inspections highlight requirements to undertake investment
which would be beyond routine maintenance, this will be considered separately for
approval and will be the subject of a report to the FCR Committee. 
4
7

Page 8

3.5. On 19 February 2008, Finance and Information Technology Committee approved an
annual contribution of up to £2,500 towards the cost of maintaining the St Nicholas
Church Tower. 
3.6. This report will provide details of the management and administration of the Common
Good funds (sections 4 and 5). 
3.7. Accounts for the Common Good are prepared on an annual basis, as part of the
Council’s year end process.  The position for the year ended 31 March 2025 is
detailed in section 6. 
3.8. An up-to-date position, including planned maintenance and committed projects, is
included in sections 7 - 9 for Lanark and section 10 for Biggar. 
4. Administration of Common Good
4.1. Finance Services administers the Common Good Account.  This includes revenue
monitoring, preparation of annual accounts and seeking Committee approval for
expenditure to be incurred on various projects as and when they are required. 
4.2. If any proposals for common good spend are considered to benefit the local
community in Lanark or Biggar, and the level of funding required is feasible, then
Finance Services will seek approval from the FCR Committee. 
4.3. A Common Good Update report is presented to the FCR Committee at least twice a
year. 
5. Role of South Lanarkshire Council’s Elected Members
5.1. Decisions on the Common Good Accounts are considered by the Council’s FCR
Committee.  Elected Members are kept up to date with any issues affecting the
Common Good and are involved in the consideration of approving spend from the
Account.  A report on the management of the Lanark and Biggar Common Good
Accounts will be provided annually to the Clydesdale Area Committee. 
6. Common Good Annual Accounts 2024/2025
6.1. Appendix 1 to the report shows the 2024/2025 audited accounts for the Lanark and
Biggar Common Good Accounts.  These form part of the Council’s Accounts that
were approved at the Risk and Audit Scrutiny Committee on 30 September 2025. 
6.2. The Appendix shows that as at the end of 2024/2025, the Balance Invested in South
Lanarkshire Council’s Loans Fund for Lanark and Biggar is £0.344 million.  This is
the cash that is held by the Council on behalf of the Common Good Accounts, and
which is readily available to meet expenditure.  Table 1 provides the details across
the two Accounts at the end of 2024/2025. 
Table 1 - Advances to South Lanarkshire Council Loans Fund 
Lanark Biggar Total 
£m £m £m
Balance at end 2024/2025 0.318 0.026 0.344 
8

Page 9

7. Lanark Common Good Fund
7.1. 2024/2025 Year-end position:  The Lanark Common Good Account holds both
assets and funds.  As noted in Table 1 (and Appendix 1), the balance invested in
South Lanarkshire Council’s Loans Fund (cash balances available to spend) is
£0.318 million and is the Lanark Common Good Account investment balance.   
7.2. As well as cash balances, the Lanark Common Good Account also holds assets. 
These are detailed in Appendix 2. 
7.3. Expenditure is incurred on the upkeep of Lanark Common Good Assets and cash
balances available can be considered for spend on specific projects.  Income is
generated from rent of particular assets.  A summary of the Income and Expenditure
for 2024/2025 is shown in Table 2. 
Table 2 - Lanark Common Good - Income and Expenditure 2024/2025   
£000
Income 
Rental Income from various properties 39
Capital Funding (Section 7.4) 688
Interest Received 13
Total Income 740  
Expenditure 
Property Costs 8
Administration of Common Good Account 2
Payments to Other Bodies (Section 7.4) 688
Depreciation and Revaluation Losses 16
Total Expenditure 714  
Net Surplus for Year 26 
7.4. The Payments to Other Bodies costs incurred during 2024/2025 was for the Lanark
Shed Masterplan (£0.688 million).  The project was funded from a contribution of
capital funding from the Scottish Government Regeneration Capital Fund. 
8. Lanark Repairs and Maintenance Budget – Planned Maintenance 2025/2026
8.1. As noted in 3.5. an annual budget of £15,000 is available for the maintenance of
Common Good properties in Lanark.  As at the last report to the Finance and
Corporate Resources Committee (September 2025) there is currently one
commitment against this budget for 2025/2026.  This is noted below. 
8.2. Lanark Racecourse Equestrian Centre:  The previous tenant vacated the property
at the end of their lease in July 2025.  Alternative use for the site is currently being
considered, and whilst this is ongoing the site has been secured for health and
safety purposes.  A request to purchase fencing and to board up and secure the
buildings has been given approval by the Executive Director of Finance and
Corporate Resources from the planned maintenance budget at a cost of £5,540. 
8.3. As reported to Finance and Resources Committee in August 2024, and this
Committee in December 2024, there were two projects approved from the 2024/2025
planned maintenance budget (section 8.4 and 8.5).  An update on these two projects
is provided below along with details of further work carried out under the 2024/2025
budget. 
9

Page 10

8.4. Tolbooth Roof Water Ingress:  A survey of the roof at the property had identified a
number of defects relating to flashings and coverings.  The costs to rectify the issues
were quoted at £8,600 and were carried out in September 2025.  An update on the
final cost will be provided to Finance and Corporate Resources Committee. 
8.5. Fence Repair at Cleghorn Road: The section of the fence at Cleghorn Road /
Melvinhall Park which required repair to a damaged section has been undertaken by
Community and Enterprise Resources and is now complete, with no charge to the
common good fund. 
8.6. Tote Building Replacement of three Boarded Windows:  Following storm
damage, three of the boarded windows of the Tote building required replacement at
a cost of £1,000.  This work was carried out and completed in May 2025 and was
approved from the remaining planned maintenance budget carried forward from
2024/2025. 
9. Lanark Common Good – Additional Funding Requests
9.1. A number of requests for funding have been received that are either not for repairs
and maintenance or which cannot be approved under delegated authority due to
level of the expected costs. 
9.2. St Nicholas Church Tower:  As reported to the Finance and Resources Committee
in August 2024 and September 2025, the Heritage Architect’s report had been
received and officers from Housing and Technical Resources were reviewing the
document to determine what work was required and how the works could be
progressed jointly with the Church. 
9.3. Unfortunately, no alternative solutions were identified, and the recommendations
remain the same as before, paint applied every 5 years with an annual washdown in
between. 
9.4. The cost relating to the church tower (£0.070 million) would be met from the Lanark
Common Good Fund.  This would involve cleaning lichen from the tower, re-painting
of the tower walls, works to leadworks, replacement of rotten timbers, additional
surveys, preliminaries, and scaffold. 
9.5. Housing and Technical Resources have recently met with the Church for an update
on how the joint project could move forward.  The Church has advised that they have
not yet secured the funding required and are looking to review the cost of the works. 
Any revisions to this cost that will impact on the Common Good, will be brought
forward to the Finance and Corporate Resources Committee for consideration. 
9.6. Lanark Racecourse Equestrian Centre:  As previously stated in section 8.2, the
stable buildings within the Equestrian Centre are to be reviewed, in order to
determine whether any of the buildings require demolition or refurbishment.  The
outcome of the review will be provided in an update to the Finance and Corporate
Resources Committee and this Committee. 
9.7. Lanark Loch Car Park repair:  Works required to repair the bottom car park at
Lanark Loch car park at an estimated cost of £0.060 million, were approved by
Finance and Corporate Resources Committee in August 2024.  
10

Page 11

9.8. Drainage investigations carried out by the Council’s flood management section are
now complete, with further works identified to be progressed alongside the
resurfacing of the car park.  The current drainage arrangement is unsuitable to be
used going forward and it is recommended that the car park drainage is diverted into
the Scottish Water scour pipe located beneath the car park.  These findings have
been passed to the Roads section in order to plan the next phase of work. 
9.9. Gate required at Drove Road Path:  A request to install a gate to deter use of dirt
bikes on the Drove Road path estimated to cost £10,000 was approved by the
Finance and Corporate Resources Committee in August 2024.  The gate has now
been installed at a lower cost of £3,190. 
9.10. Lanark Common Good Fund currently has a cash balance held by the Council, and
which is readily available to meet expenditure of £0.318 million.  Excluding the
£0.015 million set aside for planned maintenance, £0.303 million is available to meet
the proposed costs of £0.070 million (section 9.2 to 9.5), and the approved costs of
£0.060 million (section 9.7).  This would leave a balance of £0.173 million. 
10. Biggar Common Good Fund
10.1. 2024/2025 Year-end position:  The Biggar Common Good Account holds cash
balances only.  As noted in section 6.2, (and Appendix 1), the balance invested in
South Lanarkshire Council’s Loans Fund (cash balances available to spend) is
£0.026m and is the Biggar Common Good Account investment balance.   
10.2. There is little expenditure incurred by the Biggar Common Good Account.  The net
expenditure during 2024/2025, was a charge for the administration of the Account
(£134) offset by income received from the Account’s balance being invested in South
Lanarkshire Council’s Loans Fund (£1,129). 
10.3. Biggar Committed Projects:  There are no other committed projects to note. 
11. Employee Implications
11.1. None 
12. Financial Implications
12.1. All costs identified will be met from the Common Good funds held for Lanark and
Biggar. 
13. Climate Change, Sustainability and Environmental Implications
13.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
14. Other Implications
14.1. The ongoing repairs and maintenance support the viability of Common Good assets
and reduces the Council’s risk to increased liabilities in the future. 
15. Integrated Impact Assessment and Consultation Arrangements
15.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy, and therefore, no impact
assessment is required.  
11

Page 12

15.2. There is also no requirement to undertake any consultation in terms of the
information contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
6 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent 
Previous References
 Clydesdale Area Committee, 4 December 2024 
List of Background Papers
 Finance and Corporate Resources Committee, 10 September 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Lorraine O'Hagan, Head of Finance (Strategy)
Ext:  5637  (Tel:  01698 455637)
E-mail:  lorraine.ohagan@southlanarkshire.gov.uk 
12

Page 13

Appendix 1 
2024/2025 Annual Accounts Lanark Biggar 
£000 £000
Income and Expenditure Accounts  
Income for the Year 740 1
Expenditure for the Year (714) -
Surplus / (Deficit) to the Balance Sheet 26 1   
Balance Sheet  
Fixed Assets   
Property, Plant and Equipment 1,659 -
Investments  
Advances to South Lanarkshire Council Loans Fund 318 26
Total Assets 1,977 26
Current Liabilities  
Creditors (4) -
Total Assets less Current Liabilities 1,973 26   
Represented By:  
Common Good Account 1,207 25
Surplus / (Deficit) from Income and Expenditure Accounts 26 1
Amortisation of Revaluation Reserve 6 -
Gain / Loss on Disposal of Fixed Assets (58) - 
1,181 26
Revaluation Reserve  
Opening Balance 790 -
Gain / Loss on Revaluation 8 -
Amortisation of Revaluation Reserve (6) -
Closing Balance 792 -   
Total 1,973 26 
13

Page 14

Appendix 2
Lanark Common Good Assets 
Asset Name  Address 
13 Delves Road  13 Delves Road, Lanark, ML119DU 
43 High Street  43 High Street, Lanark, ML117LU 
Castlehill Bowling Green  Castlegate, Lanark, ML119EF 
Tolbooth  High Street, Lanark, ML117EX 
Lanark Moor Country Park  Hyndford Road, Lanark, ML119TA 
Lanark Racecourse  Hyndford Road, Lanark, ML119TA 
St Nicholas Church Tower  High Street, Lanark, ML11 
Moorpark Stadium  Hyndford Road, Lanark, ML119BG 
Melvinhall Park  Cleghorn Road, Lanark, ML11 
Lanark Loch Equestrian Centre  Hyndford Road, Lanark, ML11 9TA 
Braxfield Land And Plantation  Braxfield Terrace, Lanark, MLl119BZ
Castlegate Car Park North  Castlegate, Lanark, ML119E 
Castlegate Car Park South  Castlegate, Lanark, ML119D 
Castlehill Car Park  Castlegate, Lanark, ML119EF 
Newmains Farm/Former  Whitelees Road, Lanark, ML11 
Lanark Golf Club Machine Sheds  Whitelees Road, Lanark, ML11 7RX 
Smyllum Park Grazings  Smyllum Crossing, Lanark, ML117RY
Car Park  Portland Place, Lanark, ML117L 
Lanark Loch Land & Plantations  Whitelees Road, Lanark, ML11 7RX 
Springbank Farm  Lanark, ML118SG 
Railway Solum  Whitelees Road, Lanark, ML11 
Tote Building  Hyndford Road, Lanark, ML11 
14

Page 15

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 28 January 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Clydesdale
Area Committee to 18 November 2026
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Clydesdale Area Committee to 18 November 2026, attached as an appendix
to the report, be noted.
[1recs]
3. Background
3.1. Following discussion with the Chairs of the 4 Area Committees, it was agreed that a
list of items proposed for consideration at subsequent meetings be provided to afford
an opportunity for members to inform future agendas.  The outline forward
programme for Clydesdale to 18 November 2026 is attached, for members’
information, as an appendix to the report. 
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.
5
15

Page 16

8. Integrated Impact Assessment and Consultation Requirements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
15 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 Clydesdale Area Committee – 29 October 2025 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Carol Lyon, Administration Officer
Tel:  07385 370065
E-mail:-  carol.lyon@southlanarkshire.gov.uk 
16

Page 17

APPENDIX 
CLYDESDALE AREA COMMITTEE OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility   
25 March 2026 Housing and Technical Resources
Participatory Budgeting
Housing and Technical
Resources   
Youth, Family and Community
Learning Service Update
Education Resources   
Community Grants Finance and Corporate
Resources   
10 June 2026 SFRS Presentation SFRS   
South Lanarkshire Leisure and
Culture Update
SLLC   
Playscheme Grants Finance and Corporate
Resources   
Community Grants Finance and Corporate
Resources 
9 September 2026 Police Scotland Presentation Police Scotland 
Community Engagement Update  Chief Executive’s Service 
Annual Housing and
Homelessness Update 2025/2026 
Housing and Technical
Resources 
Community Grants  Finance and Corporate
Resources   
18 November 2026 Community Grants  Finance and Corporate
Resources   
Note:- Education Scotland Inspection Reports will come to Committee as and when they
are available 
17

Page 18

18

Page 19

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 28 January 2026
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for the allocation of 8 community grants from the Clydesdale
Area Committee 2025/2026 community grant budget
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a community grant be awarded as follows:- 
(a) Applicant: Lanark and District Archaeological
Society, Lanark (CL/9/25) 
Purpose of Grant: Outing and entrance fees 
Identified Community Benefits: Inspiring learners, transforming
learning, strengthening partnerships 
Estimated Cost: £700 
Total Eligible Grant Applied for: £350 
Recommendation: £350 (standard for outing and entrance
fees) 
Amount Awarded: To be determined by the Committee 
(b) Applicant: Lanark Amateur Musical Society
(CL/22/25) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £2,214 
Total Eligible Grant Applied for: £1,000* 
Recommendation: £600 (60% of £1,000) 
Amount Awarded: To be determined by the Committee 
* as advised in the guidance, the maximum award available for any one
application is normally limited to £1,000
6
19

Page 20

(c) Applicant: Coulter WRI (CL/23/25) 
Purpose of Grant: Outing 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £550 
Total Eligible Grant Applied for: £300 
Recommendation: £300 (standard for outing) 
Amount Awarded: To be determined by the Committee 
(d) Applicant: Coalburn Brass Band Family
(CL/25/25) 
Purpose of Grant: Outing 
Identified Community Benefits: Inspiring learners, transforming
learning, strengthening partnerships 
Estimated Cost: £1,000 
Total Eligible Grant Applied for: £1,000 
Recommendation: £300 (standard for outing) 
Amount Awarded: To be determined by the Committee 
(e) Applicant: Lanark Community Development Trust
(CL/26/25) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £350 
Total Eligible Grant Applied for: £350 
Recommendation: £210 (60% of £350) 
Amount Awarded: To be determined by the Committee 
(f) Applicant: Lanark, Biggar and Peebles Foal
Society (CL/27/25) 
Purpose of Grant: Materials, administration and publicity
costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £500 
Total Eligible Grant Applied for: £500 
Recommendation: £300 (60% of £500) 
Amount Awarded: To be determined by the Committee 
(g) Applicant: Blackmount Community Council
(CL/28/25) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £1,000 
Total Eligible Grant Applied for: £1,000 
Recommendation: £600 (60% of £1,000) 
Amount Awarded: To be determined by the Committee
20

Page 21

(h) Applicant: Black Mount Community Development
Trust (CL/30/25) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £1,000 
Total Eligible Grant Applied for: £1,000 
Recommendation: £600 (60% of £1,00) 
Amount Awarded: To be determined by the Committee 
3. Background
3.1. The Council operates a community grants scheme to support local constituted
community groups and voluntary organisations.  All applications require to be
supported by a constitution, audited accounts or annual income and expenditure
accounts, a bank statement, and confirmation that the group/organisation will adhere
to the conditions of the grant award.  Applications are invited continually throughout
the year. 
3.2. The main aims of the community grants scheme are to:- 
 fund activities and projects which bring community benefit
 involve people in the community by bringing them together to enjoy educational,
recreational, leisure and other community activities or to improve the local
environment 
3.3. Support can be provided for a range of activities including administration and
publicity costs, purchase of equipment and materials, annual outings and entrance
fees, start-up costs and special events. 
4. Employee Implications
4.1. None. 
5. Financial Implications
5.1. The current position of the community grants for the Clydesdale Area Committee
area in 2025/2026 is as follows:- 
Total allocation for Community Grants  £25,750
Grants previously allocated  £  8,671
Community grants allocated in this report  £  3,260
Remaining balance  £13,819 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The risk to the Council is that grant funding is not utilised for the purpose for which it
was intended.  This risk is mitigated by internal controls including audit procedures
and conditions of grant agreement.
21

Page 22

8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. All the necessary consultation with the community groups has taken place. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
12 January 2026 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 We will work towards a sustainable future in sustainable places
 Caring, connected, sustainable communities 
Previous References
 Clydesdale Area Committee – 29 October 2025 
List of Background Papers
 Individual application form 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jennifer Hilston, Clerical Assistant
Ext:  4822  (Tel:  01698 454822)
E-mail:  jennifer.hilston@southlanarkshire.gov.uk
22