Agenda Document Pack - Clydesdale Area Committee - 05/03/2025

South Lanarkshire Council · 5 March 2025
Back to Clydesdale Area Committee — 5 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Monday, 24 February 2025 
Dear Councillor 
Clydesdale Area Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 05 March 2025
Time:  14:00
Venue: Hybrid - Committee Room 1, Council Offices, Almada Street, Hamilton,
ML3 0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Paul Manning
Chief Executive 
Members 
Catherine McClymont (Chair), Ross Gowland (Depute Chair), Alex Allison, Ralph Barker,
Poppy Corbett, Lynsey Hamilton, Mark Horsham, Ross Lambie, Richard Lockhart, Eileen
Logan, Julia Marrs, Ian McAllan, David Shearer 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Clydesdale Area Committee held on 4
December 2024 submitted for approval as a correct record. (Copy attached) 
3 - 6 
Item(s) for Noting 
3 Education Scotland Report - New Lanark Primary School
A report dated 14 February 2025 by the Interim Executive Director (Education
Resources).  (Copy attached) 
7 - 12 
4 Education Scotland Report - Lesmahagow High School
A report dated 14 February 2025 by the Interim Executive Director (Education
Resources).  (Copy attached) 
13 - 18 
5 Employment Land and Property Market Analysis Report
A report dated 7 February 2025 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
19 - 26 
6 Housing and Technical Resources Participatory Budgeting
A report dated 18 February 2025 by the Executive Director (Housing and
Technical Resources).  (Copy attached) 
27 - 34 
7 Forward Programme for Future Meetings
A report dated 12 February 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
35 - 38 
Item(s) for Decision 
8 Community Grant Applications
A report dated 17 February 2025 by the Executive Director (Finance and
Corporate Resources).  (Copy attached) 
39 - 44 
Urgent Business 
9 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:-
Clerk Name: Carol Lyon
Clerk Telephone: 07385 370065
Clerk Email: carol.lyon@southlanarkshire.gov.uk 
2

Page 3

CLYDESDALE AREA COMMITTEE 
Minutes of meeting held via Confero and in Committee Room 1, Council Offices, Almada Street,
Hamilton on 4 December 2024 
Chair:
Councillor Catherine McClymont 
Councillors Present:
Councillor Alex Allison, Councillor Ralph Barker, Councillor Poppy Corbett, Councillor Ross
Gowland (Depute), Councillor Lynsey Hamilton, Councillor Mark Horsham, Councillor Ross Lambie,
Councillor Richard Lockhart, Councillor Eileen Logan, Councillor Julia Marrs, Councillor Ian
McAllan, Councillor David Shearer 
Attending:
Finance and Corporate Resources
G Booth, Finance Manager; C Lyon, Administration Officer; L Wyllie, Administration Assistant 
Also Attending:
Routes to Work South
S Barr, Chief Executive; N McNaughtan, Deputy Chief Executive 
1 Declaration of Interests 
The following interests were declared:- 
Councillor(s) Item(s) Nature of Interest(s)   
Marrs 
Gowland 
Community Grant Applications
♦ Kirkfield United Football Club (2009),
Lanark (CL/5/24) 
♦ Rigside and Douglas Valley Senior
Citizens’ Community Golf Group, Douglas
Water (CL/24/24) 
Personal connection 
Known to applicant 
2 Minutes of Previous Meeting 
The minutes of the meeting of the Clydesdale Area Committee held on 25 September 2024
were submitted for approval as a correct record. 
The Committee decided: that the minutes be approved as a correct record. 
3 Routes to Work South Presentation 
S Barr, Chief Executive and N McNaughtan, Deputy Chief Executive, Routes to Work South
(RTWS) gave a presentation on the work of RTWS. 
RTWS was a registered charity and an arms length external organisation (ALEO) of South
Lanarkshire Council and was committed to:- 
 alleviating poverty 
 creating opportunities
2
3

Page 4

 developing skills and knowledge
 supporting the people of South Lanarkshire to gain and sustain employment
 supporting local businesses to grow and develop 
Details were provided on the following aspects of RTWS:- 
 the vison of a South Lanarkshire with strong communities where people’s potential and
abilities were recognised and valued
 the mission to make a lasting difference that promoted opportunity, created choice and
enabled change
 the delivery of inclusive person-centred services that were flexible to the changing needs
of RTWS clients
 the value added to the local economy in the last 10 years
 the achievements of the organisation in the last 10 years 
The presentation also provided detailed information in relation to South Lanarkshire Works and
members were encouraged to watch the video on the cook and learn initiative via the link
provided in the presentation which had been circulated. 
All RTWS services were part of South Lanarkshire Council’s Local Employability Partnership
(LEP), and information was provided on:- 
 Adult and Youth Employability Services
 shared objectives
 the future of employability 
The RTWS Annual Impact Report 2023/2024 was circulated to members for information. 
An invitation was extended to members to visit the RTWS services/premises.  Details were also
provided on the RTWS social media platforms. 
S Barr and N McNaughtan, having responded to members’ questions, were thanked for their
informative presentation. 
The Committee decided: that the presentation be noted. 
4 Common Good Update Report
A report dated 18 November 2024 by the Executive Director (Finance and Corporate
Resources) was submitted providing background information and an update on the Lanark and
Biggar Common Good funds. 
The Common Good was a fund of money or assets, or both, and was administered by a Scottish
local authority in respect of each former burgh within the area of the local authority.  Common
Good property was owned by the local authority and administered separately from other local
authority assets for accounting purposes.   
The Common Good funds held within South Lanarkshire Council were Lanark, Biggar, Hamilton,
and Rutherglen.  Finance Services administered the Common Good Account and accounts were
prepared on an annual basis, as part of the Council’s year end process.  The position at 31
March 2024 for Lanark and Biggar were detailed in Appendix 1 to the report. 
As at 31 March 2024, Biggar Common Good Account had cash balances amounting to £0.025
million.  The Biggar Common Good Account held cash balances only and had no physical
assets.  As there were no assets to maintain, little expenditure was incurred by the Common
Good Account.
4

Page 5

A report had been submitted to the Community and Enterprise Resources Committee on 18
June 2024 on the Common Good status of Biggar Public Park and Golf Course, as detailed in
section 8 of the report. 
The position on the Lanark Common Good Account, as at 31 March 2024, showed that the fund
had cash balances amounting to £0.276 million.  As well as cash balances, the Lanark Common
Good Account also held assets, as detailed in Appendix 2 to the report. 
An annual budget of £15,000 was available for the maintenance of Common Good properties in
Lanark.  As at the last report to Finance and Corporate Resources Committee on 21 August
2024, there were 2 commitments against this budget, as detailed in paragraphs 7.6 and 7.7 of
the report. 
In addition, there were other projects that had been approved by the Finance and Corporate
Resources Committee, as detailed in paragraph 7.8 of the report. 
Decisions on the Common Good Accounts were taken by the Finance and Corporate Resources
Committee.  A report on the management of the Common Good fund would also be provided
annually to the Clydesdale Area Committee. 
The Committee decided: that the background information and update on the Lanark
and Biggar Common Good funds be noted. 
[Reference:  Minutes of 14 February 2024 (Paragraph 4)] 
5 Community Grant Applications
A report dated 18 November 2024 by the Executive Director (Finance and Corporate
Resources) was submitted on applications for community grant. 
The Committee decided: that community grants be awarded as follows:- 
(a) Applicant: Kirkfield United Football Club (2009), Lanark (CL/5/24) 
Purpose of Grant: Entrance fees, equipment, administration and publicity costs 
Amount Awarded: £300 
Councillor Marrs, having declared an interest in the above application, withdrew from the
meeting during its consideration 
(b) Applicant: Scottish Old People’s Welfare Committee (Douglas Branch)
(CL/22/24)
Purpose of Grant: Outing, entrance fees, administration and publicity costs
Amount Awarded: £390 
(c) Applicant: Rigside and Douglas Valley Senior Citizens’ Community Golf
Group, Douglas Water (CL/24/24) 
Purpose of Grant: Start-up costs 
Amount Awarded: £300 
Councillor Gowland, having declared an interest in the above application, withdrew from
the meeting during its consideration 
(d) Applicant: Abington Community Development Group (CL/25/24) 
Purpose of Grant: Equipment and materials 
Amount Awarded: £600
5

Page 6

(e) Applicant: 5 Platoon Scots Guards Lanark Army Cadet Force (CL/27/24) 
Purpose of Grant: Equipment 
Amount Awarded: £295 
[Reference:  Minutes of 25 September 2024 (Paragraph 7)] 
6 Urgent Business
There were no items of urgent business. 
6

Page 7

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 5 March 2025
Report by: Executive Director (Education Resources)  
Subject: Education Scotland Report - New Lanark Primary
School 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of the outcome of the inspection New Lanark Primary School by Education
Scotland inspectors
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Education Scotland report on New Lanark Primary School be noted.
[1recs]
3. Background
3.1. New Lanark Primary School was inspected in October 2024 as part of a national
sample of primary education. 
3.2. As part of the revised approach to inspection, the Education Scotland inspectors
evaluated the learning, teaching and assessment and raising attainment and
achievement in the school. 
3.3. The inspection team analysed questionnaires issued to parents, pupils and to all
staff. Inspectors observed class lessons and interviewed groups of pupils, including
the pupil council, and staff.  Members of the inspection team also talked to
parents/carers and children and worked closely with the headteacher and staff. 
3.4. The report by Education Scotland was published on 21 January 2025. 
4. Finding of HM inspectors 
4.1. Education Scotland made comment under the following headings:- 
 Learning, teaching, and assessment 
 Raising attainment and achievement 
4.2.  The particular strengths of the school were identified as follows:- 
 The strong and positive leadership of the headteacher who is supported well by
the principal teacher.  Together they have created a shared vision for
improvement which is leading to positive change across the school.  
3
7

Page 8

 Children’s opportunities to lead their own learning and contribute to the
leadership and improvement of the school.  This approach leads to children who
feel included in the life of the school and are proud of their community.
 The respectful and caring relationships between children and adults.  This
nurturing ethos across the school results in children making good progress in
their learning.
 The effective teamwork amongst staff and their motivation for change and
improvement.  All staff are keen to develop their individual and collective skills to
help improve children’s experiences. 
4.3. Education Scotland identified the following areas for continued improvement:- 
 Senior leaders and staff should continue to prioritise raising attainment for all
children across the school.  They should use recently implemented processes and
professional learning to improve further the use of information to track children’s
progress in their learning. 
 Staff should continue to embed approaches to assessment, planning and
moderation to ensure children’s learning is planned at the right level of difficulty
and linked to national standards. 
 Staff should continue to increase communication and parental engagement to
evaluate and shape ongoing improvement across the school. 
4.4.  The evaluations for the school were awarded were as follows:- 
As well as welcoming the strengths of the school, it should be noted that the areas for
continued improvement are already being incorporated into the school’s improvement
planning. 
4.5. Education Scotland have intimated that they are confident that the school will be able
to take forward the areas for improvement and will make no more visits in connection
with this report.  The school are in a strong position to be able to raise levels of
attainment with a particular focus on closing the poverty related attainment gap. 
4.6. Additional inspection evidence can be accessed by clicking the following web link:- 
New Lanark Primary School | Inspection Report | Education Scotland 
5. Employee Implications
5.1. None. 
6. Financial Implications
6.1. None. 
7. Climate Change, Sustainability and Environmental Implications
7.1. None. 
8. Other Implications
8.1. There are no direct risks associated with this report which is provided for information
only.  
Quality indicators for the primary school Evaluation
Learning, teaching and assessment  Good
Raising attainment and achievement Good 
8

Page 9

9. Integrated Impact Assessment and Consultation Requirements
9.1. There is no requirement to carry out an assessment in terms of the proposals
contained within this report. 
9.2. The content of Education Scotland reports is shared with parents and discussed at
Parent Council meetings. 
Anne Donaldson 
Interim Executive Director (Education Resources) 
14 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Education and learning: inspiring learners, transforming learning, strengthening
partnerships 
Previous References
 None 
List of Background Papers
 Education Scotland Report of New Lanark Primary School 21/01/2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact-:
Jacqueline Wallace, Head of Education (Clydesdale)
Tel: 01698 845 4468
E-mail: jacqueline.wallace@southlanarkshire.gov.uK 
9

Page 10

10

Page 11

1   |   New Lanark Primary School, South Lanarkshire Council, 8548625 © Crown Copyright
21 January 2025
Dear Parent/Carer 
In October 2024, a team of inspectors from Education Scotland visited New Lanark Primary
School. During our visit, we talked to parents/carers and children and worked closely with the
headteacher and staff.  
The inspection team found the following strengths in the school’s work.
• The strong and positive leadership of the headteacher who is supported well by the
principal teacher. Together they have created a shared vision for improvement which is
leading to positive change across the school.
• Children’s opportunities to lead their own learning and contribute to the leadership and
improvement of the school. This approach leads to children who feel included in the life of
the school and are proud of their community.
• The respectful and caring relationships between children and adults. This nurturing ethos
across the school results in children making good progress in their learning. 
• The effective teamwork amongst staff and their motivation for change and improvement.
All staff are keen to develop their individual and collective skills to help improve children’s
experiences. 
The following areas for improvement were identified and discussed with the headteacher and
a representative from South Lanarkshire Council.
• Senior leaders and staff should continue to prioritise raising attainment for all children
across the school. They should use recently implemented processes and professional
learning to improve further the use of information to track children’s progress in their
learning.
• Staff should continue to embed approaches to assessment, planning and moderation to
ensure children’s learning is planned at the right level of difficulty and linked to national
standards. 
• Staff should continue to increase communication and parental engagement to evaluate
and shape ongoing improvement across the school. 
3
11

Page 12

2   |   New Lanark Primary School, South Lanarkshire Council, 8548625 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school? (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for New Lanark Primary
School 
Quality indicators Evaluation
Leadership of change  good
Learning, teaching and assessment good
Ensuring wellbeing, equality and inclusion good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the Education Scotland website at: Reports page | Inspection reports | Education Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. South Lanarkshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Louise Phillips
HM Inspector 
12

Page 13

Report
Agenda Item 
Report to: Clydesdale Area Committee 
Date of Meeting: 5 March 2025
Report by: Executive Director (Education Resources)  
Subject: Education Scotland Report - Lesmahagow High
School 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise of the outcome of the inspection of Lesmahagow High School by Education
Scotland inspectors
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the Education Scotland report on Lesmahagow High school be noted.
[1recs]
3. Background
3.1. Lesmahagow High was inspected in December 2024 as part of a national sample of
secondary education. 
3.2. As part of the revised approach to inspection, the Education Scotland inspectors
evaluated the learning, teaching and assessment and raising attainment and
achievement in the school. 
3.3. The inspection team analysed questionnaires issued to parents, pupils and to all
staff. Inspectors observed class lessons and interviewed groups of pupils, including
the representatives from pupil groups, and staff.  Members of the inspection team
also talked to parents/carers and children and worked closely with the headteacher
and staff. 
3.4. The report by Education Scotland was published on 11 February 2025. 
4. Finding of HM inspectors 
4.1. Education Scotland made comment under the following headings:- 
 Learning, teaching, and assessment 
 Raising attainment and achievement 
4.2.  The particular strengths of the school were identified as follows:- 
 The headteacher, ably supported by her depute headteachers, has created a
very positive ethos across the school and the Inclusion Support Team.  This is
built upon nurturing, supportive relationships that create a sense of inclusion, a
strong sense of belonging and calm, purposeful learning environments.
4
13

Page 14

 Young people who are proud of their school.  Staff have strong, effective working
relationships with partners in the community.  Partners work well with staff to
provide a wide range of helpful supports and activities for young people and staff. 
These help young people attend, attain and achieve.
 Staff check the progress of young people well at specific points across the year. 
They use this information effectively to support young people.  As a result, young
people, including those who require additional support with their learning, make
very good progress in literacy and numeracy. 
4.3.  Education Scotland identified the following areas for continued improvement:- 
 Across the school, teachers should make greater use of ongoing assessment.  This
should help improve the pace in lessons and help more young people engage in
appropriately challenging tasks and activities.
 Staff should continue to focus on improving the transition and build on prior learning
between S3 and the senior phase.  Staff should also work to improve the quality of
passes in National Qualifications in order to raise attainment. 
4.4.  The evaluations for the school were awarded were as follows:- 
As well as welcoming the strengths of the school, it should be noted that the areas for
continued improvement are already being incorporated into the school’s improvement
planning. 
4.5. Education Scotland have intimated they are confident that the school will be able to
take forward the identified areas for improvement and will make no more visits in
connection with this report.  The school are in a strong position to be able to continue
to raise levels of attainment with a particular focus on closing the poverty related
attainment gap. 
4.6. Additional inspection evidence can be accessed by clicking the following web link:- 
Lesmahagow High School | Inspection Report | Education Scotland 
5. Employee Implications
5.1. None 
6. Financial Implications
6.1. None 
7. Climate Change, Sustainability and Environmental Implications
7.1. None 
8. Other Implications
8.1. There are no direct risks associated with this report which is provided for information
only. 
9. Integrated Impact Assessment and Consultation Requirements
9.1. There is no requirement to carry out an assessment in terms of the proposals
contained within this report. 
Quality indicators for the primary school Evaluation
Learning, teaching and assessment  Good
Raising attainment and achievement Good
14

Page 15

9.2. The content of Education Scotland reports is shared with parents and discussed at
Parent Council meetings. 
Anne Donaldson 
Interim Executive Director (Education Resources) 
14 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Education and learning: inspiring learners, transforming learning, strengthening
partnerships 
Previous References
 None 
List of Background Papers
 Education Scotland Report of Lesmahagow High School 11 February 2025 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact-:
Jacqueline Wallace, Head of Education (Clydesdale)
Tel: 01698 454468  
E-mail: Jacqueline.Wallace@southlanarkshire.gov.uk 
15

Page 16

16

Page 17

1   |     Lesmahagow High School, South Lanarkshire Council, 8550131 © Crown Copyright 
11 February 2025 
Dear Parent/Carer 
In December 2024, a team of inspectors from Education Scotland visited Lesmahagow High
School. During our visit, we talked to parents/carers and young people and worked closely
with the headteacher and staff. 
The inspection team found the following strengths in the school and Inclusion Support
Team’s (IST) work. 
• The headteacher, ably supported by her depute headteachers, has created a very positive
ethos across the school and the Inclusion Support Team. This is built upon nurturing,
supportive relationships that create a sense of inclusion, a strong sense of belonging and
calm, purposeful learning environments. 
• Young people who are proud of their school. Staff have strong, effective working
relationships with partners in the community. Partners work well with staff to provide a wide
range of helpful supports and activities for young people and staff. These help young people
attend, attain and achieve. 
• Staff check the progress of young people well at specific points across the year. They use
this information effectively to support young people. As a result, young people, including
those who require additional support with their learning, make very good progress in literacy
and numeracy. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from South Lanarkshire Council. 
• Across the school, teachers should make greater use of ongoing assessment. This should
help improve the pace in lessons and help more young people engage in appropriately
challenging tasks and activities. 
• Staff should continue to focus on improving the transition and build on prior learning
between S3 and the senior phase. Staff should also work to improve the quality of passes in
National Qualifications in order to raise attainment. 
4
17

Page 18

2   |     Lesmahagow High School, South Lanarkshire Council, 8550131 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Lesmahagow High
School. 
Quality indicators Evaluation
Learning, teaching and assessment good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale. 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Lesmahagow High School | Inspection Report | Education Scotland. 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. South Lanarkshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Frances E. Graham
HM Inspector 
18

Page 19

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 5 March 2025
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Employment Land and Property Market Analysis
Report 
1. Purpose of Report
1.1. The purpose of this report is to:- 
 advise of the conclusions of the recently completed Employment Land and Property
Market Analysis
 advise that the outcomes of these reports will inform the future economic
development policy and any future investment by the Council 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):- 
(1) that the content of the report be noted. 
3. Background
3.1. In March 2022, the Scottish Government published its National Strategy for Economic
Transformation.  The 10-year strategy provides a set of key priorities and actions with
a vision of achieving a wellbeing economy that is prosperous for all the country’s
people and places.  A wellbeing economy is one that delivers economic prosperity
across social, economic, and environmental dimensions.  This includes capitalising
on Scotland’s most advantageous economic opportunities such as the transition to a
net zero economy and a green recovery from the Covid-19 pandemic and reducing
socio-economic inequalities. 
3.2. One aspect of the Strategy’s vision is for Scotland to be ‘the best place to start and
grow a business’.  However, Scotland falls behind other countries in terms of its
productivity as too few businesses are starting-up or scaling-up, with limited access to
infrastructure a recognised factor.  Meanwhile, the strategy’s inclusive growth aims
will require investment in high productivity sectors.  Additionally, the transition to net
zero offers new market opportunities for example in energy, manufacturing and
finance.  Having an adequate supply of employment land and property in the correct
locations is a factor in each of these aims. 
3.3. To understand the South Lanarkshire employment land and property supply, Ryden LLP
property consultants were appointed to provide employment land and property market
analysis for South Lanarkshire.  This work was implemented in four parts to form a suite
of reports which Ryden has prepared to inform the next Local Development Plan (LDP3)
and the Council’s wider planning, regeneration and property portfolio activities.  The four
reports, along with the overarching Summary Report consider the employment land and
property markets for:- 
5
19

Page 20

 Clydesdale
 Hamilton, Blantyre and Larkhall
 East Kilbride
 Cambuslang and Rutherglen 
3.4. The information used to formulate the reports has come from a range of sources
including recognised electronic data sources.  Site visits were also undertaken, and the
views of occupiers were sought.  Input was also invited from a range of public and
private sector professionals from the commercial property market and drawing this data
and information from multiple sources has enriched the final reports and the quality of
the information contained within. 
3.5. Each of the reports follows the same structure to enable comparison to be made and
overarching data to be compiled and key information includes:- 
 a strategic economic and planning policy context for the property markets
 core market analysis covering industrial and office property
 assessment of employment land and development activity
 a review of funding sources for employment land
 identification of market potential and possible actions 
4. Market Potential and Analysis
4.1. Detailed reports have been produced for each of the areas detailed in paragraph 3.3
above and the following gives a broad indication of the conclusions reached in relation
to the Clydesdale Study.  Further details and more extensive information is available for
Clydesdale and the other geographical areas in the completed Ryden reports. 
4.2. Clydesdale Area 
Clydesdale, with the towns in scope namely Carluke, Lanark, Lesmahagow and Biggar
and a large rural area, has an industrial stock of 1.7 million sq.ft., in an estimated 217
units, including both occupied and vacant industrial buildings.  This is around 8% of
South Lanarkshire total industrial stock by floorspace. 
4.3. The Report identifies that working from the study area’s industrial floorspace of
approximately 1.7 million sq.ft. and assuming a building lifespan of 60 years, c.28,000
sq.ft. of new development or comprehensive refurbishment would be required each year
to fully replenish the stock.  Set against this, Clydesdale’s industrial stock is not
particularly old or obsolete in design terms other than on certain estates, new
development is not common, and buildings may be upgraded to continue to meet
occupiers needs.  The Report identifies that the more pressing need in Clydesdale is to
ensure that the key employment centres have a supply of units, while monitoring the
wider stock for any signs of obsolescence (through age, condition, or
environmental/energy performance). 
4.4. The percentage geographic split of office property across South Lanarkshire is as
follows:- 
 East Kilbride had 56% (35 on average each year)
 Hamilton had 22% (15 deals)
 Cambuslang/ Rutherglen had 16% (10 deals)
 Clydesdale had 6% (4 deals)  
20

Page 21

4.5. Clydesdale is not a core office location.  Of the 3.8 million sq.ft available across the
Council area it has an office stock of c. 200,000 sq.ft. which is equivalent to 6% of South
Lanarkshire’s total office floorspace.  Office market potential is affected by the shift to
home and hybrid working but is supported in Clydesdale by local services based in the
communities.  The performance of older existing stock in terms of the risk of rising
vacancies requiring repurposing should be monitored, as should the success and
impacts of the emerging new community-based developments. 
4.6. The geographic split of office property across South Lanarkshire is as follows:- 
 Hamilton has 44%
 East Kilbride has 38%.
 Cambuslang and Rutherglen have 14%
 Clydesdale has 4% 
4.7. Take-up of employment land in Clydesdale has potentially been suppressed by an
absence of effective supply.  The analysis carried out as part of the Report identifies a
requirement to support this sector and the bringing forward of fully serviced sites such
as the Council owned site on South Faulds Road Lanark, most likely for owner-occupied
development though potentially also for Council direct development should be
considered. 
4.8. By area the overall employment land supply is distributed as follows:- 
 East Kilbride has 32 sites totalling 66.20 hectares
 Hamilton has 9 sites totalling 14.37 hectares
 Cambuslang/ Rutherglen has 18 sites totalling 34.49 hectares
 Clydesdale has 12 sites totalling 215.20 hectares, with Poneil accounting for the
vast majority of this 
4.9. South Lanarkshire wide 
The Ryden summary report brings together the research and findings of the four
localised reports.  Where required it updates underlying information to present a
contemporary, South Lanarkshire-wide market picture. 
4.10. The industrial property market in South Lanarkshire is extensive, reflecting the area’s
role and connectivity with the wider conurbation. Larger towns with extensive
employment land and property include East Kilbride, Hamilton and Blantyre, and
Cambuslang and Rutherglen as well as smaller settlements to the south.  The Summary
Report highlights the following:-  
 South Lanarkshire’s current stock of industrial property is estimated at 15.9 million
sq.ft.  This industrial stock includes large facilities such as TATA steelworks in
Cambuslang (441,000 sq.ft., vacant), Coca Cola (323,000 sq.ft.) and Sainsbury’s
Distribution Depot in East Kilbride (274,000 sq.ft.)
 South Lanarkshire’s principal industrial development eras were the 1970s (20% of
stock), 1980s (25%) and 1990s (17%).  This means that more than half of the local
authority area’s industrial stock is at least 44 years old.  While age is not the only
guide to property obsolescence, detailed analysis within Ryden’s subregional
reports identifies at-risk stock as well as instances of industrial properties being
refurbished.  Energy performance is an increasing concern both in terms of carbon
emissions and energy costs  
21

Page 22

 As with West Central Scotland as a whole, South Lanarkshire has low industrial
property availability, currently sitting at 3.8%.  At this level of vacancy, it is likely
that occupiers will experience restricted choice of premises in terms of locations,
sizes, specification, and quality/modernity.  The vacancy rate has fallen from a high
of 9.1% recorded in 2013 which was the tail-end of the weak market following the
global financial crisis
 South Lanarkshire has an office availability rate of 12%.  This is marginally above
the 11% office availability rate for Glasgow City Region and has been rising
recently.  The current office supply of c. 443,000 sq.ft. is contained within 43 offices;
however, the supply is very adaptable to sub-divisible and flexible options in
serviced offices/business centres.  This being the case the Council will focus
available resources around the industrial sector rather than office provision.
 The market assessment reports provide a summary of the existing employment
supply and demand across the Council area.  The reports also identify
opportunities and priority areas where SLC and its partners could most effectively
focus future investment 
4.11. Conclusion 
In conclusion the Summary Report identifies a number of actions that should be
pursued.  These include measures and recommendations on a South Lanarkshire
Wide basis to:- 
 stimulate the refurbishment of existing industrial stock
 actively encourage the creation of development ready plots
 look at where the Council can intervene in the market to ensure new supply of
industrial and office properties 
5. Funding 
5.1. Historically the European Union Structural Funds would have been a source of funding
support but Brexit means that participation is no longer possible. Several new funding
streams have, however, become available to replace the lost European Funding.  This
includes, at a UK level, funds related to the levelling up agenda now managed via the
Ministry of Housing, Communities and Local Government, Green Freeports and
investment Zones and Place and Community Wealth Building and natural capital
support from the Scottish Government.  City Deal and Scottish Enterprise also have a
role to play. 
5.2. From a public sector funding perspective South Lanarkshire Council is eligible to apply
to a number of UK Government and Scottish Government funds as outlined above 
Efforts should be continued to produce funding applications associated with
employment land, although competition is fierce and the award of funding
unpredictable in this challenging economic climate.  Recent changes to the structures
and composition of the UK Government are also likely to have, as yet unknown
implications. 
5.3. Market failure is common in Scotland outside of city centres and strategic transport
corridors and public sector intervention in the property market is often required in areas
where market failure exists in order to support economic development.  The Council
will continue to pursue identified opportunities but going forward the private sector will
be key to investment and supply.  A strong local economy that attracts good quality
tenants will ensure a healthy property market that can attract investment. 
22

Page 23

6. Next Steps and Timescales
6.1.  The Summary Report recommends a number of possible interventions and
recommendations, and it is intended that these will influence actions incorporated into
future economic development activity.  These South Lanarkshire wide priority areas
and potential interventions, where external funding will require to be identified,
include:- 
 Targeting existing industrial stock
 seek to support to landlords and occupiers to upgrade premises through
incentivisation
 focusing direct SLC investment in stock in poorest condition and undertaking
exemplar projects
 identifying funding sources
 demolition and/or redevelopment of areas of obsolescence in Council owned
stock 
 Serviced plots between 0.2 and 0.5 hectares
 development ready plots are undersupplied so monitor the supply of private
sector sites
 bring forward sites in public ownership for development and promote via the
Local development Plan and “Invest South Lanarkshire” website
 review the Vacant and Derelict Land supply
 promote South Lanarkshire, with its excellent transport links and easy access
to Glasgow as a sub-regional location via the “Invest South Lanarkshire”
website and targeted publicity 
 Monitor industrial development
 review and monitor the private sector to identify projects that will address the
undersupply of modern units
 identify opportunities where selective market intervention could be provided
 target potential funding opportunities which would support this sector 
 Monitor the office market
 direct support for flexible office space
 reinvesting in existing Council managed office buildings
 monitor the loss of office stock to the supply
 monitor the ‘Cat A’ office market
 seek to explore alternative property management models for the office sector 
6.2. All the above will have to be undertaken against the existing background of fragmented
demand data and of managing existing funds within a changing funding environment. 
The Council will have a role to play in the delivery of many of these actions identified
in the reports, although in many cases the role will be that of regulatory body with a
limited direct involvement in delivery. 
6.3. At the Community and Enterprise Committee on 26 November 2024, the Committee
approved the adoption of the Ryden review reports as a basis to move forward and
approvals relating to specific projects including funding, delivery and lead partners will
be taken to the appropriate committee for approval at a future date.  
23

Page 24

6.4. Community and Enterprise Resources are looking at further opportunities at key sites
including South Faulds Road, Caldwellside Industrial estate, Lanark, Canderside, and
Conexus, Coalburn.  The site at South Faulds Road forms part of the Council’s bid to
the Glasgow City Region, Enabling and delivering Commercial Space project where
funding is being sought to deliver new commercial space for let and unlock sites for
future development.  Similarly the Council is supporting owners at Conexus to attract
investment and deliver economic development and maximise the potential of the site. 
6.5. Key to a successful employment sector is the marketing of South Lanarkshire.  The
Council’s “Invest South Lanarkshire” website is now built and this will serve as an
important platform for the marketing of key sites and property and serve as the
gateway for private sector investors/developers to contact the Council. 
7. Employee Implications
7.1. There are no employee implications through the endorsement of the review reports. 
8. Financial Implications
8.1. The costs for the Council in preparing the property Analysis Reports have been funded
with support from the Shared Prosperity Fund. 
8.2. As noted, the Report identifies a number of actions and projects which will require
funding.  Each will be considered on an individual basis and will be subject to separate
approvals. It is the intention that external funding will lead the delivery of investment. 
8.3. Implementation of actions will focus on the co-ordination of activity that will largely be
funded through external funding.  The financial resources required to deliver the Action
Plans will be considered on a project-by-project basis.  In addition, the Report provides
a basis to support external funding bids from a range of sources, however, it is
important to note that much of the success of the plan will relate to support and
investment from the private sector. 
9. Climate Change, Sustainability and Environmental Implications 
9.1. The Report was prepared having regard to the existing and emerging challenges
around climate change and sustainability.  It is intended to complement and comply
with the Council’s and wider communities’ aspirations in the area. 
10. Other Implications 
10.1. The risks associated with not supporting the report outcomes is that South
Lanarkshire’s employment land and property sector will not have a co-ordinated
approach to its response to the many challenges it faces.  The performance of this
sector has a significant impact on the local economy and quality of life for South
Lanarkshire citizens.  The Council’s reputation could also be damaged if it is not seen
to actively support the sector. 
11. Integrated Impact Assessment and Consultation Arrangements 
11.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no Integrated Impact 
Assessment is required. 
24

Page 25

11.2. Consultations have been co-ordinated by Enterprise and Sustainable Development
Services with a range of other Council Services who have an ongoing role in
employment land and property within South Lanarkshire.  This consultation and co-
operation will continue throughout the duration of the initiative. 
David Booth
Executive Director (Community and Enterprise Resources) 
7 February 2025 
Link(s) to Council Values/Priorities/Outcomes
Values
 Accountable, effective, efficient, and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
Priorities
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve
Outcomes
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities 
Previous References
 Community and Enterprise Committee, 26 November 2024 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
John Archibald, Project Development Officer, Enterprise and Sustainable Development
Services
E-mail: john.archibald@southlanarkshire.gov.uk
25

Page 26

26

Page 27

Update for Clydesdale Area Committee 
Participatory Budgeting – Update for Area Committee
Service Area Estate Improvement
Budget/HIP
Environmental
Programme
Lead Officer Pamela Newey 
Stage 1: Pre-Consultation
• What are we asking the public for their view on (what service is it / description etc)? 
• How much funding are we asking about? 
• Who are we asking, 
• How are we doing this?  
• When are we doing this?
• When will we report back? 
Estate Improvement Budget 
The Estate Improvement Budget totals £40,000 and is split across the 4 housing divisions of
South Lanarkshire.  Each Local Housing Management Team can direct the funding towards
projects or improvements highlighted as a priority by customers of Housing and Property
Services.  Although limited in value, the budget is ideally suited for conversion to a participatory
budgeting approach as often it funds a number of smaller projects that have been highlighted as a
priority by customers. Examples of exercises include customer engagement on options for the
type and design of new fencing and street lighting to improve safety. 
To date, two projects are being undertaken within the Clydesdale following discussions with local
tenants and residents:- 
• Improving parking at Shand Lane in Carluke.
• Upgrading car park at Park Street in Carluke. 
Housing Revenue Account budget for the 2023/2024 - Housing Investment Programme
Engagement with tenants on the overall Housing Revenue Account budget for the 2024/2025
period, and the proposed level and focus of the Housing Investment Programme, took place as
part of the annual resource budgetary consultation process.  The Environmental aspect of the
Housing Investment Programme (the ‘Environmental Programme’) is a significant budget area that
covers a wide range of projects that seek to improve the quality and energy efficiency of the
council’s domestic housing stock. 
Examples of projects within this budget area can include replacement doors and windows within
properties, or redevelopment of communal areas in multi-storey buildings or sheltered housing
facilities.  Not all projects included within this budget area are suitable for inclusion of a
participatory budgeting approach, however for those that are officers will ensure the required
element of choice and voting opportunities are offered to customers and appropriately recorded. 
To date, one participatory budgeting project has been undertaken during 2024/2025 at Glebe
Gardens sheltered housing site in Lesmahagow where tenants have been consulted on a series
of environmental upgrades. 
Stage 2: Post Consultation
• The outcome of the PB activity 
• What happens next? 
• Further reporting requirements (eg required Committee approval)    
6
27

Page 28

Estate Improvement Budget
A total of £10,041.41 from the Estate Improvement Budget was spent in the Clydesdale division
during 2024/2025 on a range of tenant priorities:- 
• Following feedback from tenants and residents in Carluke about the poor quality of the
road conditions, the car park was resurfaced at Shand Lane (just off Newbarns Street).
• In response to complaints that non-residents were using reserved parking bays at Park
Street in Carluke, bollards were installed to ensure that spaces are available for tenants
and residents.   
Glebe Gardens Sheltered Housing Site, Lesmahagow
10 sheltered housing tenants have been consulted on plans for external upgrades.  This included
a consultation meeting to discuss tenant priorities to inform the development of plans.  Tenants
then had the opportunity to review and feedback on proposals before the onsite work started. 
The upgrades included an overhaul of the grounds which saw pathways improved, uneven
gardens at the rear of the properties levelled and made accessible, the installation of accessible
drying facilities and new planting throughout.   
The total cost of the upgrades was £122,648.95. 
Officers from Housing and Technical Resources will continue to take forward opportunities within
Clydesdale to ensure tenants and other customers can determine the outcome of budgets within
the Environmental Programme and Estate Improvement Budget, with further updates provided to
Committee. 
28

Page 29

Housing and Technical Resources – Participatory Budgeting 2024/25
Clydesdale Area Committee – March 2025 
Estate Improvement Budget (1)
Tenants in Carluke had reported the poor quality of the road surface at the car park in
Shand Lane (just off Newbarns Street).   The local Estate Improvement Budget was used
to fund the costs of resurfacing the road.
Car Park at Shand Lane (before) 
Car Park at Shand Lane (after) 
6
29

Page 30

30

Page 31

Housing and Technical Resources – Participatory Budgeting 2024/25
Clydesdale Area Committee – March 2025 
Housing Investment Programme (Environmental)
A range of external upgrades were made at the Glebe Gardens sheltered housing site in
Lesmahagow, including the improvement of pathways, levelling of gardens and
installation of accessible drying facilities. 
31

Page 32

Housing and Technical Resources – Participatory Budgeting 2024/25
Clydesdale Area Committee – March 2025 
32

Page 33

Housing and Technical Resources – Participatory Budgeting 2024/25
Clydesdale Area Committee – March 2025 
33

Page 34

34

Page 35

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 5 March 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Forward Programme for Future Meetings 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 advise members of the forward programme for the meetings of the Clydesdale
Area Committee to 28 January 2026
 invite members to suggest topics for inclusion in the Committee’s forward
programme
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that the report and the outline forward programme for the meetings of the
Clydesdale Area Committee to 28 January 2026, attached as an appendix to
the report, be noted.
[1recs]
3. Background
3.1. Following discussion with the Chairs of the 4 Area Committees, it was agreed that a
list of items proposed for consideration at subsequent meetings be provided to afford
an opportunity for members to inform future agendas.  The outline forward
programme for Clydesdale to 28 January 2026 is attached, for members’
information, as an appendix to the report. 
4. Employee Implications
4.1. There are no employee implications. 
5. Financial Implications
5.1. There are no financial implications. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no Climate Change, Sustainability or Environmental implications in terms
of the information contained within this report. 
7. Other Implications 
7.1. There are no risk implications in terms of the information contained within this report.
7
35

Page 36

8. Integrated Impact Assessment and Consultation Arrangements
8.1. The report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. There was no requirement to undertake any consultation in terms of the information
contained in this report. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
12 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, Effective, Efficient and Transparent 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Carol Lyon, Administration Officer
Tel:  07385 370065
E-mail:-  carol.lyon@southlanarkshire.gov.uk 
36

Page 37

APPENDIX 
CLYDESDALE AREA COMMITTEE OUTLINE FORWARD PROGRAMME 
Meeting Date Item Responsibility   
21 May 2025 Scottish Fire and Rescue Service
Presentation 
SFRS 
Care and Repair Lanarkshire
Presentation 
Care and Repair Lanarkshire 
Education Resources Participatory
Budgeting
Education Resources   
Playscheme Grants Finance and Corporate
Resources 
Community Grants Finance and Corporate
Resources   
20 August 2025 Police Scotland Presentation Police Scotland   
Community Justice – Unpaid Work
Initiatives Presentation
Community Justice 
Community Grants Finance and Corporate
Resources 
29 October 2025 Community Planning Update Chief Executive’s Service   
Community Asset Transfer Update Housing and Technical
Resources 
Community Grants Finance and Corporate
Resources   
28 January 2026 Community Grants Finance and Corporate
Resources   
Note:- Education Scotland Inspection Reports will come to Committee as and when they
are available 
37

Page 38

38

Page 39

Report
Agenda Item 
Report to: Clydesdale Area Committee
Date of Meeting: 5 March 2025
Report by: Executive Director (Finance and Corporate Resources)  
Subject: Community Grant Applications 
1. Purpose of Report
1.1. The purpose of the report is to:-
[purpose]
 request approval for the allocation of 9 community grants from the Clydesdale
Area Committee 2024/2025 community grant budget
 request authorisation for the Executive Director (Finance and Corporate
Resources), in consultation with the Chair, to approve further community grant
applications meeting the relevant criteria in the period to 31 March 2025 from
the 2024/2025 budget
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) that a community grant be awarded as follows:- 
(a) Applicant: Kirkfield Sky Blues 2011, Lanark
(CL/26/24) 
Purpose of Grant: Start-up costs 
Identified Community Benefits: Our children and young people thrive 
Estimated Cost: £325 
Total Eligible Grant Applied for: £325 
Recommendation: £300 
Amount Awarded: To be determined by the Committee 
(b) Applicant: Elsrickle Community Hub Limited
(CL/28/24) 
Purpose of Grant: Start-up costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £1,100 
Total Eligible Grant Applied for: £1,000 
Recommendation: £300 
Amount Awarded: To be determined by the Committee
8
39

Page 40

(c) Applicant: Forth and Wilsontown Bowling Club,
Forth (CL/29/24) 
Purpose of Grant: Equipment 
Identified Community Benefits: People live the healthiest lives possible 
Estimated Cost: £433 
Total Eligible Grant Applied for: £433 
Recommendation: £300 
Amount Awarded: To be determined by the Committee 
(d) Applicant: Coalburn Homing Club (CL/30/24) 
Purpose of Grant: Equipment, administration and
publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £500 
Total Eligible Grant Applied for: £500 
Recommendation: £300 
Amount Awarded: To be determined by the Committee 
(e) Applicant: Lanark, Biggar and Peebles Foal Show
Society, Lesmahagow (CL/31/24) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £280 
Total Eligible Grant Applied for: £280 
Recommendation: £170 
Amount Awarded: To be determined by the Committee 
(f) Applicant: The Association of the Friends of
Crawfordjohn Heritage Venture
(CL/32/24) 
Purpose of Grant: Materials, administration and publicity
costs 
Identified Community Benefits: Inspiring learners, transforming
learning, strengthening partnerships 
Estimated Cost: £300 
Total Eligible Grant Applied for: £300 
Recommendation: £180 
Amount Awarded: To be determined by the Committee 
(g) Applicant: Blackmount Community Council,
Biggar (CL/33/24) 
Purpose of Grant: Administration and publicity costs 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £1,000 
Total Eligible Grant Applied for: £1,000 
Recommendation: £600 
Amount Awarded: To be determined by the Committee
40

Page 41

(h) Applicant: Tarbrax Common and Village Hall
Trust (CL/34/24) 
Purpose of Grant: Equipment 
Identified Community Benefits: Caring, connected, sustainable
communities 
Estimated Cost: £1,000 
Total Eligible Grant Applied for: £1,000 
Recommendation: £600 
Amount Awarded: To be determined by the Committee 
(i) Applicant: Lanark and District Pipe Band, Lanark
(CL/35/24) 
Purpose of Grant: Equipment 
Identified Community Benefits: Inspiring learners, transforming
learning, strengthening partnerships 
Estimated Cost: £1,300 
Total Eligible Grant Applied for: £1,000 
Recommendation: £600 
Amount Awarded: To be determined by the Committee 
(2) that the Executive Director (Finance and Corporate Resources), in
consultation with the Chair be authorised to approve any further community
grant applications meeting the relevant criteria in the period to 31 March 2025
from the 2024/2025 budget. 
3. Background
3.1. The Council operates a community grants scheme to support local constituted
community groups and voluntary organisations.  All applications require to be
supported by a constitution, audited accounts or annual income and expenditure
accounts, a bank statement, and confirmation that the group/organisation will adhere
to the conditions of the grant award.  Applications are invited continually throughout
the year. 
3.2. The main aims of the community grants scheme are to:- 
 fund activities and projects which bring community benefit
 involve people in the community by bringing them together to enjoy educational,
recreational, leisure and other community activities or to improve the local
environment 
3.3 Support can be provided for a range of activities including administration and
publicity costs, purchase of equipment and materials, annual outings and entrance
fees, start-up costs and special events. 
4. Employee Implications
4.1. None.
41

Page 42

5. Financial Implications
5.1. The current position of the community grants for the Clydesdale Area Committee
area in 2024/2025 is as follows:- 
Total allocation for Community Grants  £25,750
Grants previously allocated  £10,085
Community grants allocated in this report  £  3,350
Remaining balance  £12,315 
5.2 In view of the fact that this is the last meeting of the Committee in the current
financial year, and to allow any further applications submitted prior to the end of the
current financial year to be considered, it is proposed that the Executive Director
(Finance and Corporate Resources), in consultation with the Chair, be authorised to
approve any further community grant applications meeting the relevant criteria in the
period to 31 March 2025.  Information on those grants awarded would be reported to
a future meeting. 
6. Climate Change, Sustainability and Environmental Implications
6.1. There are no implications for climate change, sustainability or the environment in
terms of the information contained in this report. 
7. Other Implications
7.1. The risk to the Council is that grant funding is not utilised for the purpose for which it
was intended.  This risk is mitigated by internal controls including audit procedures
and conditions of grant agreement. 
8. Integrated Impact Assessment and Consultation Arrangements
8.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact
assessment is required. 
8.2. All the necessary consultation with the community groups has taken place. 
Jackie Taylor
Executive Director (Finance and Corporate Resources) 
17 February 2025 
Link(s) to Council Values/Priorities/Outcomes
 Accountable, effective, efficient and transparent
 We will work towards a sustainable future in sustainable places
 Caring, connected, sustainable communities 
Previous References
 Clydesdale Area Committee – 4 December 2024
42

Page 43

List of Background Papers
 Individual application form 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Jennifer Hilston, Clerical Assistant
Ext:  4822  (Tel:  01698 454822)
E-mail:  jennifer.hilston@southlanarkshire.gov.uk
43

Page 44

44