Democracy Spraffa

Agenda Document Pack - Climate Change and Sustainability Committee - 09/11/2022

South Lanarkshire Council · 9 November 2022
Back to Climate Change and Sustainability Committee — 9 November 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Council Offices, Almada Street        
Hamilton, ML3 0AA 
Tuesday, 01 November 2022 
Dear Councillor 
Climate Change and Sustainability Committee 
The Members listed below are requested to attend a meeting of the above Committee to be
held as follows:- 
Date:  Wednesday, 09 November 2022
Time:  10:00
Venue: Hybrid - Council Chamber, Council Offices, Almada Street, Hamilton, ML3
0AA 
The business to be considered at the meeting is listed overleaf. 
Yours sincerely 
Cleland Sneddon
Chief Executive 
Members 
Mark McGeever (Chair), Kirsten Robb (Depute Chair), Joe Fagan (ex officio), Alex Allison,
John Anderson, Ralph Barker, Janine Calikes, Maureen Chalmers, Ross Clark, Margaret
Cooper, Colin Dewar, Ross Gowland, Lynsey Hamilton, Gavin Keatt, Ross Lambie, Richard
Lockhart, Katy Loudon, Julia Marrs, Monique McAdams, Lesley McDonald, Elaine
McDougall, Carol Nugent, Mo Razzaq, John Ross, Dr Ali Salamati, Graham Scott, Bert
Thomson, Margaret B Walker  
Substitutes
Walter Brogan, Robert Brown, Andy Carmichael, Gerry Convery, Poppy Corbett, Andrea
Cowan, Allan Falconer, Gladys Ferguson-Miller, Elise Frame, Mark Horsham, Martin Hose,
Richard Nelson, David Watson 
1

Page 2

BUSINESS 
1 Declaration of Interests 
2 Minutes of Previous Meeting
Minutes of the meeting of the Climate Change and Sustainability
Committee held on 31 August 2022 submitted for approval as a correct
record.  (Copy attached) 
5 - 14 
Item(s) for Noting 
3 Climate Change and Sustainability
Presentation by Secondary School representatives on Education
Resources' Youth Forum 
Monitoring Item(s) 
4 Good Food Strategy Update – Quarter 2 2022/2023
Report dated 18 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
15 - 40 
Item(s) for Decision 
5 Public Bodies Climate Change Duties Annual Report 2021/2022
Report dated 18 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
41 - 72 
6 Clyde Climate Forest Concordat
Report dated 19 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
73 - 84 
Item(s) for Noting 
7 Mid-Term Report on the Climate Emergency Fund 2021 to 2024
Report dated 24 October 2022 by the Executive Director (Community and
Enterprise Resources).  (Copy attached) 
85 - 114 
Urgent Business 
8 Urgent Business
Any other items of business which the Chair decides are urgent. 
For further information, please contact:- 
Clerk Name: Pauline MacRae
2

Page 3

Clerk Telephone: 07385 370044
Clerk Email: pauline.macrae@southlanarkshire.gov.uk 
3

Page 4

4

Page 5

CLIMATE CHANGE AND SUSTAINABILITY COMMITTEE 
Minutes of meeting held via Confero and in the Council Chamber, Council Offices, Almada Street,
Hamilton on 31 August 2022 
Chair:
Councillor Mark McGeever 
Councillors Present:
Councillor Alex Allison, Councillor John Anderson, Councillor Ralph Barker, Councillor Walter
Brogan (substitute for Councillor Graham Scott), Councillor Janine Calikes, Councillor Ross Clark,
Councillor Gerry Convery (substitute for Councillor Monique McAdams), Councillor Margaret
Cooper, Councillor Colin Dewar, Councillor Gladys Ferguson-Miller (substitute for Councillor John
Ross), Councillor Ross Gowland, Councillor Lynsey Hamilton, Councillor Mark Horsham (substitute
for Councillor Maureen Chalmers), Councillor Gavin Keatt, Councillor Ross Lambie, Councillor
Richard Lockhart, Councillor Julia Marrs, Councillor Lesley McDonald, Councillor Elaine McDougall,
Councillor Mo Razzaq, Councillor Kirsten Robb (Depute - after item 2), Councillor Dr Ali Salamati,
Councillor Bert Thomson 
Councillors' Apologies:
Councillor Maureen Chalmers, Councillor Joe Fagan (ex officio), Councillor Katy Loudon, Councillor
Monique McAdams, Councillor Carol Nugent, Councillor John Ross, Councillor Graham Scott,
Councillor Margaret B Walker 
Attending:
Community and Enterprise Resources
D Booth, Executive Director; E Berry, Policy Officer; K Carr, Head of Facilities, Waste and Grounds;
H Gourichon, Policy Development Officer (Food Development); L Hinshelwood, Sustainable
Development Officer; J Richmond, Carbon Management Officer; M Wilkie, Performance and Policy
Development Manager
Finance and Corporate Resources
P MacRae, Administration Adviser; K McLeod, Administration Assistant
Housing and Technical Resources
S Turner, Section Leader (Legislative) 
1 Declaration of Interests 
No interests were declared. 
2 Appointment of Depute Chair 
The Chair asked for nominations for the position of Depute Chair of the Climate Change and
Sustainability Committee 
Councillor Clark, seconded by Councillor Convery, moved that Councillor Robb be appointed as
Depute Chair of the Climate Change and Sustainability Committee. 
The Committee decided: that Councillor Robb be appointed as Depute Chair of the
Climate Change and Sustainability Committee.
2
5

Page 6

3 Action Plan for the Third Year of Implementation (2022/2023) of the Good Food
Strategy 
A report dated 28 July 2022 by the Executive Director (Community and Enterprise Resources)
was submitted on the action plan for the third year of implementation (2022/2023) of the
Council’s Good Food Strategy. 
The Council’s Good Food Strategy 2020 to 2025 was approved by the Executive Committee at
its meeting on 4 December 2019.  The Strategy provided a framework for actions to move
towards healthier, fairer and more sustainable food systems in the Council area and aimed to
ensure that food played a positive role in the lives of South Lanarkshire residents.   
The action plan for the third year of implementation of the Good Food Strategy, attached as
Appendix 1 to the report, had been developed based on input from a variety of Services across
the Council’s Resources. 
The action plan comprised 2 sections, Performance Indicators and Projects, and each section
was divided into the following Good Food themes:- 
 Good Food at Home and in the Community
 Good Food in Public Places
 Good Food Economy
 Good Food Growing
 Good Food for the Environment
 Good Food Governance 
Measures and actions were reported by outcome as defined in the Good Food Strategy. 
In addition to the Good Food Strategy, the Council had a statutory obligation to develop a Food
Growing Strategy and provide allotments and other food growing opportunities.  Given the
relationship between the Food Growing Strategy and the Good Food Strategy and the
requirement to report within similar timescales, the Good Food Strategy action plan for
2022/2023 incorporated the main Food Growing Strategy actions, allowing progress on food
growing to be reported to the Committee. 
A mid term review of the Strategy would be undertaken from mid 2023 and would assess the
broader outcomes and overall impacts of the 5 year Strategy. 
Officers responded to members’ questions on various aspects of the report. 
The Committee decided: that the Council’s action plan for the third year of
implementation (2022/2023) of the Good Food Strategy,
attached as Appendix 1 to the report, be approved. 
[Reference:  Minutes of the Executive Committee of 4 December 2019 (Paragraph 9)] 
4 Litter Strategy for South Lanarkshire 
A report dated 22 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on the Litter Strategy for South Lanarkshire for the period 2022 to
2027. 
At its meeting on 10 February 2020, the Committee agreed to the development of a Council-
wide Litter Strategy to cover a five year period from 2022 to 2027.  The development of the
Strategy had involved a wide range of consultation, engagement and communication across the
Council and with partners and communities to identify opportunities and shared objectives.
6

Page 7

The overall vision of the Council’s Litter Strategy was to provide a cleaner place to live, work
and visit, free of litter, fly tipping and dog waste. 
The Strategy would be underpinned by:- 
 encouraging awareness, behaviour change and personal responsibility
 working in partnership with different communities and community groups
 meeting legislative requirements on the Code of Practice on Litter and Refuse (Scotland)
2018 
The objectives of the Strategy fell within the 3 key themes of Education, Engagement and
Enforcement and actions in relation to each of those themes were detailed in the report.  If
approved, the Strategy would go through a design process to ensure that it was user friendly. 
Progress on the implementation of the Strategy would be reported to the Committee on an
annual basis. 
In September 2021, a pre-screening exercise was undertaken to assess whether a Strategic
Environmental Assessment (SEA) was required. A Pre-Screen Exemption Statement was
submitted in November 2021 stating that the Litter Strategy did not seek to change or amend
policies contained in the Community Plan or the Council Plan, both of which had been subject to
SEA.  No concerns were raised, or further assessment requested by the Consultation
Authorities within the statutory timeframe.  It was concluded that no further SEA work was
required for the Litter Strategy. 
There followed a full discussion during which officers responded to members’ questions on
various aspects of the report. 
The Committee decided: that the Litter Strategy for South Lanarkshire for the period
2022 to 2027 be approved. 
[Reference:  Minutes of 10 February 2020 (Paragraph 6) and 3 November 2021 (Paragraph 6)] 
In terms of Standing Order No 14, the Chair adjourned the meeting at 11.40am for a 10 minute
period.  The meeting reconvened at 11.50am without the attendance of Councillors Allison and
Calikes 
5 Sustainable Development and Climate Change Strategy Update – Quarter 4
2021/2022 
A report dated 22 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on the status of the actions and measures contained in the
Sustainable Development and Climate Change Strategy (SDCCS) at Quarter 4 of 2021/2022. 
The Council’s SDCCS covered a 5-year period from 2017 to 2022.  Delivery of actions within the
Strategy provided the main focus for sustainable development activity over the period and
enabled the Council to fulfil its duties under the Local Government (Scotland) Act 2003, the
Climate Change (Scotland) Act 2009 and other associated environmental legislation. 
The SDCCS Action Plan for 2021/2022 contained 36 performance measures towards the
Strategy’s outcomes together with 74 improvement actions.  The measures were rated using a
traffic light system of green, amber or red, while the improvement actions were rated using
green, amber or red as well as blue which indicated that an action had been completed.  Of the
36 measures within the SDCCS:- 
 20 had seen the timescale or target met according to expectations(green)
 0 had minor slippage against timescale or minor shortfall against target (amber)
7

Page 8

 2 had seen major slippage against timescale or major shortfall against target (red)
 9 would be reported later when data was available
 5 were contextual and provided a health check for South Lanarkshire 
Of the 74 improvement actions within the SDCCS:- 
 15 actions had been completed (blue)
 40 had seen the timescale or target met according to expectations (green)
 14 had seen some minor slippage against targets (amber)
 2 had seen major slippage against targets (red)
 3 would be reported later when data was available 
The 2 red improvement actions related to household waste and recycling issues and were as a
result of the Covid pandemic and the consequent high staff absence levels in the Service. 
There were also 14 amber improvement measures that had seen minor slippage.  7 of those
were as a result of Covid-19 restrictions or reprioritisation of resources to continue service
delivery during the pandemic.  Details were provided on management actions taken to ensure
there was no further slippage in respect of the 7 amber improvement measures that had seen
minor slippage which was not related to Covid. 
Progress on all objectives, actions and measures was detailed in the Quarter 4 performance
report for 2021/2022, attached as an appendix to the report. 
There followed a discussion during which officers responded to members’ questions on various
aspects of the report. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 2 February 2022 (Paragraph3)] 
6 Sustainable Development and Climate Change Strategy 2017 to 2022
Achievements Report 
A report dated 22 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on key achievements of the Sustainable Development and Climate
Change Strategy 2017 to 2022. 
The Council’s Sustainable Development and Climate Change Strategy (SDCCS) had been
approved by the Executive Committee on 6 December 2017 and covered the period 2017 to
2022.  The Strategy set out outcomes and actions organised around the following 3 sustainable
development themes:- 
 sustainable Council
 sustainable environment
 sustainable communities 
The Strategy had been successful in embedding climate change action and sustainability into all
Resources’ and Services’ delivery.  Its 5-year term had now ended, and a new Strategy,
covering the period 2022 to 2027, had been approved at the full Council meeting on 15 June
2022. The new Strategy would build on the success and key achievements from the previous
Strategy.  Details of the key achievements of the Strategy over the 5 year period 2017 to 2022
were provided in the report.
8

Page 9

The Committee decided: that the report be noted. 
[Reference:  Minutes of the Executive Committee of 6 December 2017 (Paragraph 2) and
Minutes of South Lanarkshire Council of 15 June 2022 (Paragraph 6)] 
7 Sustainable Development and Climate Change Strategy 2022 to 2027 
A report dated 1 August 2022 by the Executive Director (Community and Enterprise Resources)
was submitted on the development of the Sustainable Development and Climate Change
Strategy (SDCCS) 2022 to 2027. 
In September 2020, the Climate Change and Sustainability Committee approved the
development of the next SDCCS for the period 2022 to 2027.  It was agreed that the Strategy
should set out how the Council aimed to develop sustainably and tackle climate change over
that period as well as providing a broad strategic direction for longer term planning to help to
deliver on agreed outcomes and contribute to achieving the longer-term vision. 
An internal workshop, 9 online community engagement focus groups and responses to an online
survey helped shape the vision and themes of the Strategy.  The Strategic Environment
Assessment was finalised in January 2021 and, along with the draft SDCCS, was the subject of
public consultation from 1 February to 15 March 2022.   
All of the comments from the public consultation had been reviewed and, where appropriate,
incorporated into the final draft, which was attached as Appendix 1 to the report. 
Based on the significant engagement and consultation, as well as legislative requirements and
national/local policy, a vision and mission statement, 4 themes and 13 priority/focus areas had
been developed and those were detailed in the report.  The themes had been aligned with the
themes of the Council Plan. 
The new Strategy would be web-based and published on the Council website.  The content of
the web-based pages would be reviewed every 6 months to ensure that it was as up-to-date and
relevant as possible.  Work would continue across the Council to develop the accompanying
action plan which would be reviewed annually and reported to the Climate Change and
Sustainability Committee on a 6-monthly basis. 
The Committee decided: that the report be noted. 
[Reference: Minutes of 17 September 2020 (Paragraph 2) and Minutes of South Lanarkshire
Council of 15 June 2022 (Paragraph 6)] 
8 Carbon Emissions - Non-Domestic Buildings 
A report dated 23 August 2022 by the Executive Director (Housing and Technical Resources)
was submitted on:- 
 the baseline carbon emissions for the Council’s non-domestic operational property portfolio
 progress in the reduction of carbon emissions from non-domestic properties to date and
actions required to achieve the Scottish Government target for public sector buildings to be
“zero emissions” by 2038
9

Page 10

It was considered that investment to meet the target requiring public sector non-domestic
buildings to reduce emissions from heating to zero would be significant in terms of both capital
and revenue.  As fossil fuels were replaced by electrically powered solutions, the demand on the
electricity grid would increase significantly which would have implications in terms of stability of
supply. 
In terms of the Council’s carbon emissions baseline from non-domestic buildings, details were
given on:- 
 carbon emissions by building category
 carbon emissions from electricity and gas consumption respectively
 carbon emissions from changes in the Council’s non-domestic portfolio
 other factors affecting carbon emissions 
Due to the scale of investment required, a thorough assessment of service requirements would
have to be undertaken to identify properties likely to be needed in the future and what carbon
reductions could be achieved through repurposing, demolition or disposal. 
Actions towards an investment plan would involve:- 
2022/2023
 realigning existing programmes to fabric first
 undertaking 3 feasibility studies and reporting on recommendations
 commencing an area based asset review
 identifying a funding stream for options appraisals to be carried out on a building by
building basis
 assessing the skills and resources required to deliver and implement the investment plan 
2023/2024
 completing the area based asset review
 developing the first 3 year programme
 developing Local Heat and Energy Strategies (LHEES) and implementation plan 
In response to a member’s question, the Executive Director (Community and Enterprise
Resources) advised that a report on the incorporation of sustainability into new build property
would be submitted to a future meeting of the Committee. 
The Committee decided: that the report be noted. 
9 Good Food Strategy Update – Quarter 4 2021/2022 
A report dated 23 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on the Good Food Strategy actions and measures at Quarter 4 of
2021/2022. 
The Good Food Strategy had been approved by the Executive Committee on 4 December 2019
and covered a 5 year period from 2020 to 2025.  It set out outcomes and actions organised
around 6 key themes as follows:- 
 good food at home and in the community  good food growing
 good food in the public sector  good food for the environment
 good food economy  good food governance 
10

Page 11

The Good Food Strategy contained an action plan which set out specific actions to progress the
objectives in the Strategy. It contained 21 performance measures towards the Strategy’s
outcomes together with 36 improvement actions. The measures were rated using a traffic light
system of green, amber or red, while the improvement actions were rated using green, amber or
red as well as blue which indicated that an action had been completed.  Of the 21 measures
within the Strategy:- 
 10 had been achieved or were on course to be achieved (green)
 1 had seen some minor slippage against targets (amber)
 2 had seen major slippage against timescale or major shortfall against targets (red)
 8 would be reported later when data was available 
Of the 36 actions within the Strategy:- 
 7 had been completed (blue)
 26 had been achieved or were on course to be achieved (green)
 0 had seen some minor slippage against targets (amber)
 3 had seen major slippage against timescale or major shortfall against targets (red)
 0 would be reported later when data was available 
Further information on the performance measures and improvement actions categorised as red
was provided in the report. 
An update on other food related actions which had been developed but not included in the
IMPROVe report, as the decision to implement them had been taken after approval of the
2021/2022 action plan, was provided and included:- 
 the expansion of the Universal Free School Meals to primary 4 children
 the development of the Scottish Milk and Healthy Snack Scheme in nurseries
 summer session hubs which ran within 14 locations across South Lanarkshire for a period
of 6 weeks, serving breakfast and lunch each day 
Progress on all objectives, actions and measures was detailed in the Quarter 4 performance
report for 2021/2022, attached as an appendix to the report. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 2 February 2022 (Paragraph 4)] 
10 Food Growing Annual Report 2021/2022 
A report dated 10 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on the Food Growing Annual Report 2021/2022 which had been
published on the Council’s website. 
In accordance with legislative requirements, the Council had produced a Food Growing Strategy
covering the period 2020 to 2025.  The Council was required to publish its Food Growing Annual
Report as soon as reasonably practical after the end of each reporting year.  The Annual Report
required to incorporate mandatory information, outlined by the Scottish Government, in relation
to food growing. 
The Annual Report for 2021/2022, attached as Appendix 1 to the report, detailed food growing
activity and related financial information for the period April 2021 to March 2022.
11

Page 12

Progress had been disrupted by the Covid-19 pandemic as the Council had been required to
reduce and suspend a number of services following Government advice, however, work had
continued where possible. 
The Committee decided: that the report be noted. 
[Reference:  Minutes of 26 May 2021 (Paragraph 3)] 
11 Food Growing Sites – Hamilton Area 
A report dated 10 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted on proposals for developing food growing sites in the Hamilton area. 
Following the introduction of the Community Empowerment (Scotland) Act 2015, the Council’s
Food Growing Strategy was implemented in 2020.  The Council was legislatively required to
increase food growing to meet waiting list demands and currently provided 6 Council managed
sites. 
As a result of higher demand in East Kilbride and Cambuslang and Rutherglen, efforts to
provide food growing sites had concentrated primarily in those areas.  There was now, however,
a reasonable level of demand in the Hamilton area and, due to the size and spread of the area,
it was anticipated that 2 sites would be required, one to cover Hamilton, Blantyre and the
surrounding area and the other to cover Hamilton, Larkhall and the surrounding area. 
Sites had been identified as follows:- 
 Chatelherault Country Park (former garden centre) which would accommodate around 60
to 90 plot holders
 land adjacent to Springwells Hall, Blantyre which would accommodate up to 70 plot
holders 
A sum of £200,000 had been ringfenced as part of the Food Strategy Fund and it was
anticipated that this would be used for at least one of the sites identified in the Hamilton area. 
The development of a second site in the area would be dependent on additional funding being
identified. 
It was proposed that a formal planning application be submitted for each of the sites to establish
whether additional conditions would be applied which could materially affect the cost of each
development.  This could potentially assist in determining which site was progressed first. 
The Committee decided: that the report be noted. 
12 Single Use Item Reductions 
A report dated 22 August 2022 by the Executive Director (Community and Enterprise
Resources) was submitted providing an update on efforts to reduce the procurement of single
use items across the Council. 
In addition to work undertaken from 2018 onwards to reduce or design out the use of single use
items, the Council, in line with the Single-use Plastic Products (Scotland) Regulations 2021
which came into effect on 1 June 2022, had been actively replacing any single use plastic
products affected by the legislation, such as food takeaway boxes, with products made from
more sustainable materials.
12

Page 13

Details were given on the reduction in use of targeted single use items, using 2017/2018 as a
baseline year for most items, with some items using a 2018/2019 baseline.  The outcome had
been positive, however, some of the reductions were directly related to the suspension of some
related Council services during the pandemic.  In line with national trends, the use of single use
PPE, as a result of Covid, had increased.   
Work would continue to raise awareness of the need to reduce reliance on single use items and
to ensure that they were disposed of properly. 
The Committee decided: that the report be noted. 
13 Urgent Business 
There were no items of urgent business. 
13

Page 14

14

Page 15

Report
Agenda Item 
Report to: Climate Change and Sustainability Committee
Date of Meeting: 9 November 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Good Food Strategy Update – Quarter 2 2022/2023 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 update the Committee on the status of Good Food Strategy actions and measures
at Quarter 2 of 2022/2023 
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) That the 2022/2023 Quarter 2 position in respect of actions and measures within the
Good Food Strategy is noted. 
3. Background
3.1. On 4 December 2019, the Executive Committee approved the Good Food Strategy which
covers a five-year period from 2020 to 2025. 
3.2. The vision of the strategy is to contribute to the improvement of the quality of life of
everyone in South Lanarkshire through the development of a Good Food Council where
food is celebrated, supports healthy life and wellbeing, is affordable and accessible to all,
encourages a fair and inclusive food economy, has limited impacts on the environment
and climate change, and promotes animal welfare. 
3.3. The strategy sets out outcomes and actions organised around six themes and twelve
objectives: 
Good Food at Home and in the Community 
1. Supporting good food education and culture
2. Reducing food poverty and insecurity 
Good Food in the Public Sector
3. Improving food in schools and in council properties
4. Improving food in public places  
4
15

Page 16

Good Food Economy
5. Supporting a good food retail and catering environment
6. Encouraging a fair and inclusive local food economy 
Good Food Growing
7. Providing food growing opportunities
8. Promoting good food growing and sustainability 
Good Food for the Environment 
9. Reducing waste and packaging
10. Limiting the impact of food system on the environment and climate change 
Good Food Governance 
11. Developing and strengthening food partnerships
12. Making good food a priority in the council’s area 
3.4. The strategy action plan set out specific actions to be undertaken to deliver these
objectives under each theme. 
3.5. The action plan for the third year of implementation of the strategy was approved by the
Climate Change and Sustainability Committee on 31 August 2022 and is monitored using
IMPROVe. Its progress is reported to the Climate Change and Sustainability Committee
at Quarter 2 and Quarter 4. 
4. Good Food Strategy 2022/2023 Quarter 2 Update
4.1. The action plan progress report comes in two parts; the first part contains
performance/contextual measures towards the strategy’s outcomes, and the second part
contains improvement actions for each of the themes within the strategy. 
4.2. The overall summary of performance measures at the end of quarter two is as follows:- 
Total number of performance/ contextual measures 22
Status – Green
The timescale or target has been met as per
expectations  7 (32%)
Status – Amber
There has been minor slippage against timescale or
minor shortfall against target  1 (5%)
Status - Red
There has been major slippage against timescale or
major shortfall against target  0 (0%)
Reportable at a
later stage/
contextual
For some measures, the statistics are not yet
available to allow us to report whether the target has
been reached or not. These will be reported when
available 
14 (64%) 
Percentages may not total 100 due to rounding 
4.3.  One of the measures is amber which is the level of uptake of school meals (free and paid)
in secondary schools, the uptake being 39% and the target 47%. Uptake has been lower
since the pandemic and this is in line with the national trend as shown by the Healthy
Living Survey (national survey carried out in February 2022). However, the level of uptake
is improving and in period 6 alone, the uptake was 44%.  
16

Page 17

4.4. Fourteen of the measures will be reported later or are contextual. With respect to nine
indicators, Q2 data is not available at the time of reporting and may only be reported on
an annual basis (therefore will be reported at Q4). With respect to five indicators, Q2 data
is reported as contextual because the update is for information only. There is no target,
nor does it make sense to set one (e.g. number of food parcels delivered by food banks).   
4.5. The overall summary of improvement actions at the end of quarter two is as follows: - 
Total number of improvement actions 20
Status - Blue Action Complete  1 (5%)
Status – Green
The timescale or target has been met as per
expectations  16 (80%)
Status – Amber
There has been minor slippage against timescale or
minor shortfall against target  2 (10%)
Status - Red
There has been major slippage against timescale or
major shortfall against target  0 (0%)
Reportable at a
later stage/
contextual
For some measures, the statistics are not yet
available to allow us to report whether the target has
been reached or not. These will be reported when
available 
1 (5%) 
Percentages may not total 100 due to rounding 
4.6. Two of the measures are amber. These measures relate to Planning projects: the audit
for the development of the Open Space Strategy has been delayed due to a lack of
resources to carry out this work but is now nearly complete; no Local Place Plans were
produced as their development is dependent on local communities and desire to produce
a plan and interest has been limited so far. 
4.7. One measure is to be reported later. Progress on the mid-term review of the Good Food
Strategy will be undertaken later next year.   
4.8. Progress on all objectives, actions and measures is set out in Appendix 1. Some of the
highlights for each of the themes of the action plan include: 
Good food at home and the community 
 Summer Session Hubs ran within 14 locations this summer for a duration of 6 weeks
with breakfast and lunch served each day to 834 children in total
 The Kitchen Learning Hub was delivered to 169 service users of the Unpaid Work
Service (Social Work) and bread making sessions to 202 service users. The service
also started a new project promoting a seed to plate approach with the recruitment
of an Educational Gardener, it will allow service users to grow vegetable within
Auchentibber grounds
 The Youth Family and Community Learning service (Education) has delivered food
related learning programmes to 567 learners over the first six months of the year,
already surpassing the planned annual target of 220 learners.
17

Page 18

 A cash referral leaflet developed by the Independent Food Aid Network in
partnership with the Council, Citizens’ Advice Bureau and local food banks was
launched in May and distributed in several places in South Lanarkshire including at
the Summer Session Hubs and in schools. The leaflet helps people maximise
income and access any existing financial entitlements 
Good food in the public sector
 The Food Pledge developed by Facility Services is promoted on all menu
promotional materials and available on the Council website
 The analysis on the capacity of local food and drink businesses to supply food to the
different Council buyers was carried out from July to October 2022 with consultations
with Council services, local businesses, and other external partners. Results will be
presented and next steps discussed from November 2022 
Good food economy 
 96% of food businesses were compliant with food safety statutory requirements, the
target being 85%
 For the second year, the Council part-funded a co-ordinator post for Lanarkshire
Larder, which is a local network for local food and drink businesses including 60
members
 Economic development supported 62 local food and drink businesses by directly
providing advice, signposting them to a broad range of other support services and
by supporting them with networking and funding 
Good food growing 
 Progress in relation to food growing (including the number of people involved in food
growing and size of land made available for food growing) is now being reported
annually
 Plans considering the provision of land for food growing and embedding health and
wellbeing when possible are under development by Planning in collaboration with
other Council Services.  This includes the Open Space Strategy, the Local Place
Plans and the Local Development Plan 3 
Good food and the environment
 The decision was taken to offer hot composters to rural areas as an alternative to
extending the food waste collection service to rural areas that do not currently have
a means of recycling food waste. The tendering process to purchase hot composters
is now complete
 The Waste Education team reviewed the materials presented in primary schools to
include a section on the food waste journey and to emphasize the need to reduce
food waste
 Facility Services is now meeting the Environmental Protection (Single-use Plastic
Products) (Scotland) Regulation 2021 introduced in June 2022 
Good food governance 
 The “South Lanarkshire Good Food Forum discussion list”, made up of more than
50 food stakeholders in the Council area is regularly used to share information such
as the development of new local food initiatives or funding opportunities
18

Page 19

 The Community Planning Partnership Board took the decision to adopt a more
integrated approach to food among partners at its meeting in September 2022 with
the approval of several recommendations including sharing more information,
mainstreaming and promoting Good Food, and engaging with communities to
support them in the development of healthier, fairer and more sustainable food
systems 
5. Employee Implications
5.1. Resources and Services involved in food related activities are required to contribute to
the implementation of the Good Food Strategy to ensure that actions and targets are met.
The Policy Officer (Food Development) monitors and reports the Council’s progress. 
6. Financial Implications
6.1. Specific financial implications relating to the implementation of the action plan were
reported on a case-by-case basis. 
7. Climate Change, Sustainability and Environmental Implications
7.1. The Food Action Plan 2022/2023, by taking into account all the aspects of the food
systems from farm to fork and encouraging the transition towards a more sustainable food
system, will help to achieve the objectives of the Climate Change and Sustainability
Strategy. 
8. Other Implications
8.1. There are no implications for risk in terms of the information contained within this report. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. The Equality Impact Assessment has been conducted and approved. 
10. Strategic Environmental Assessment
10.1. Following the SEA pre-screening exercise and communication with the Scottish
Government, it was concluded that no further action was required in relation to the SEA
process for the Good Food Strategy 
David Booth
Executive Director 
18 October 2022 
Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Working with and respecting others
 Accountable, effective, efficient and transparent
 Ambitious, self-aware and improving
 Fair, open and sustainable
 Excellent employer 
Priorities
19

Page 20

 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Previous References
 Executive Committee 4 December 2019 - Good Food Strategy
 Climate Change and Sustainability Committee 31 August 2022 – Action Plan for the third
year of implementation of the Good Food Strategy 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please contact:
Michelle Wilkie 
(Performance and Policy Development Manager)
E-mail: michelle.wilkie@southlanarkshire.gov.uk 
20

Page 21

IMPROVe - SLC Performance Management System                                                                                   Report printed on 11 Oct 11:51
Quarter  :  - April to June
Performance Report
Appendix 1
4
21

Page 22

IMPROVe - SLC Performance Management System                                                                                   Report printed on 11 Oct 11:51
Page 2 of 3
22

Page 23

IMPROVe - SLC Performance Management System                                                                                   Report printed on 11 Oct 11:5123

Page 24

IMPROVe - SLC Performance Management System                                                                                   Report printed on 11 Oct 11:51
Summary (Section 1) - number of Quantitative Measures green, amber and red under each
Good Food Strategy objective
Theme Green Amber Red Report later /
Contextual
Total
Good Food at Home and in the Community 1 0 0 3 4
Good Food Economy 1 0 0 1 2
Good Food for the Environment 0 0 0 2 2
Good Food Governance 0 0 0 1 1
Good Food Growing 1 0 0 4 5
Good Food in the Public Sector 4 1 0 3 8
Total 7 1 0 14 22
Summary (Section 2) - number of Project Measures complete, green, amber and red under
each Good Food Strategy objective
Theme Complete Green Amber Red Report later Total
Good Food at Home and in the Community 0 3 0 0 0 3
Good Food in the Public Sector 1 1 0 0 0 2
Good Food Economy 0 2 0 0 0 2
Good Food Growing 0 1 2 0 0 3
Good Food for the Environment 0 4 0 0 0 4
Good Food Governance 0 5 0 0 1 6
Total 1 16 2 0 1 20
Page 1 of 17
24

Page 25

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Strategy
Section 1: Quantitative measures
Page 2 of 17
25

Page 26

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food at Home and in the Community
1. Supporting good food education and culture 2. Reducing food insecurity and poverty
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Number of learners from Youth, Family and
Community Learning service (Education)
benefiting from food related learning
programmes
567 learners have taken part in food related learning programmes
through the Youth, Family and Community Learning Service across
South Lanarkshire.
Food growing and cooking projects include the ‘Nowhere to Grow’
Project and ‘Eco Eaters’; REHIS related programme; Healthy cooking
and nutrition programmes; cooking on a budget; after school cookery
and dinner clubs; baking programmes for young people and outdoor
cookery programmes.
The programmes have helped learners to identify healthy alternatives
and improve skill and knowledge in relation to health and overall
wellbeing.
Green 220 567 0 567 414
Number of children eligible for free school
meals and supported during school holiday
periods (£2.50 per day)
The number of children currently entitled to Free School Meals
payments during school holiday periods is 8,562. This figure is subject to
change as the year progresses.
Contextual ------ 8,562 0 0 0
Number of referrals to specific food
initiatives for families experiencing food
insecurity (Best Start Food applications;
Healthy Start Voucher applications; Food
Bank referrals; School meal applications;
Scottish Welfare Fund applications)
Money Matters made 625 food related referrals for families experiencing
food insecurity during the Q1 and Q2 periods. This includes 502 to food
banks, 68 to the Scottish Welfare Fund crisis grants, 40 to Best Start
Food and 15 to school meals.
Contextual ------ 625 0 0 1,056
Number of food parcels delivered by food
banks
The figures covering period quarter one and quarter two 2022/23 will be
available from early October 2022.
Report Later ------ ------ 0 0 41,293
Good Food in the Public Sector
3. Improving food in schools and council properties 4. Improving food in public places
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Level of free primary school meals uptake
(as proportion of total primary school free
meals which could be taken up over the
period)
The free school meal uptake level is on target to be met by the year end. Green 65% 68% 0% 0% 58%
Page 3 of 17
26

Page 27

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food in the Public Sector
3. Improving food in schools and council properties 4. Improving food in public places
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Level of free secondary school meals
uptake (as proportion of total secondary
school free meals which could be taken up
over the period)
Free meal uptake achieving target. Green 41% 42% ------ 41% 44%
Level of total (free and paid) primary school
meal uptake (as proportion of total primary
school meals which could be taken up over
the period)
Meal uptake is achieving target set. Green 59% 65% 59% 41% 58%
Level of total (free and paid) secondary
school meal uptake (as proportion of total
secondary school meals which could be
taken up over the period)
Uptake of secondary school meals has been lower since the pandemic,
but is in line with figures taken from the Scotland census February 2022.
However, we can see a growing improvement in the figures and in
period 6 alone, the uptake figure was 44%. We expect the year to date
figure to improve over the winter period when uptake is traditionally
higher.
Amber 47% 39% 47% 24% 36%
Number of lunches served in nursery
schools as part of new Scottish
Government Early Years Initiative.
Included is the Period 1 - 5 lunch figures.  Period 6 is not yet available
and will be reported in quarter three.
Green 450,500 177,229 288,486 218,249 438,249
Number of free breakfasts served in
primary schools during school days
Number of free breakfasts served in primary schools during school days
is 226,919 (figures covering period 1 to period 6).
Contextual ------ 226,919 0 0 0
Annual public procurement spending on
Fairtrade products in schools and council
premises
Data are reported annually. Report Later ------ ------ ------ £3,890 £4,116
Annual public procurement spending on
local food (i.e. food produced or
manufactured in Scotland)
Data are reported annually. Report Later ------ ------ 0% 0% 39%
Page 4 of 17
27

Page 28

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Economy
5. Supporting a good food retail and catering environment 6. Encouraging a fair and inclusive local food economy
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Food businesses compliant with food
safety statutory requirements
The rating scheme used to determine broad compliance with food safety
requirements in food businesses operating within South Lanarkshire and
inspected by Environmental Services assesses overall compliance with
both food hygiene and food standards legislation.
Year to date, 96% of food businesses were found to be broadly
compliant with both food hygiene and food standards legislation.
This compliance figure continues to exceed the annual target set for this
measure, and has increased gradually since a new food law rating
scheme has come into effect. This is due to the fact that the new food
law rating scheme allows local authorities to focus resources on high
risk and non-compliant businesses by conducting more frequent
inspections in these establishments
Green 85% 96% ------ 90% 93%
Number of local food businesses engaged
with and supported (start-ups and
established)
Economic Development supported 62 local food and drink businesses
by directly providing advice to businesses, sign-posting them to a broad
range of other support services and by supporting them with networking
and funding.
Contextual ------ 62 0 0 0
Good Food Growing
7. Providing food growing opportunities 8. Promoting good food growing and sustainability
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Size of Prime Agriculture Land protected
from development
There has been no loss of prime agricultural land during the period. Green 6,213 6,213 0 0 6,213
Increase in the number of overall plot
holders on Council managed food growing
sites by March 2023
Data are reported annually.
The objective is to increase the number of plotholders by 10%.
Report Later 36 ------ 0 0 31
Increase in the area of council land made
available for food growing sites by March
2023
Data are reported annually.
The objective is to increase the area by 10%.
Report Later 10% ------ 0% 0% 20%
Page 5 of 17
28

Page 29

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Growing
7. Providing food growing opportunities 8. Promoting good food growing and sustainability
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Increase in the overall number of food
growing participants on council land
including schools, care homes, housing
areas and areas managed by community
groups or third party organisations by
March 2023
Data are reported annually.
The objective is to increase the number of food growing participants by
5%.
Report Later 261 ------ 0 0 167
Occupancy levels at council managed food
growing sites
Data are reported annually. Report Later 98% ------ 0% 0% 99%
Good Food for the Environment
9. Reducing food waste and packaging 10. Limiting the impact of food system on the environment and climate change
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Share of householders using the council's
food waste collection service
A count of bins with food in them will take place in January-February
2023 when tonnage of garden waste is at the lowest level, therefore
providing more accurate figures.
Report Later ------ ------ ------ ------ ------
Quantity of food waste from school
catering as proportion of total food
purchased (all food waste is collected by
council contractor for
recycling/composting)
Figures will be reported at Q4. Report Later 2% ------ ------ ------ 1%
Page 6 of 17
29

Page 30

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Governance
11. Developing and strengthening food partnerships 12. Making good food a priority in the council's area
Performance Indicators Comments/ Progress Status 2020/21 2021/
22
2019/20Target To Date
-------- Last 3 Years ------------------- This Year -----------
Report on the £0.3m Food Strategy
Support Fund budget including the
community grants by March 2024
£0.27m has been committed, with the breakdown of projects approved
in 2022-2023 as follows:
- £5,000 for Unpaid Work Service Garden Project (Social Work)
- £15,000 to develop Additional Growing Space at Richmond Allotment
- £32,500 to five other projects which were approved for funding in
financial year 2021/22
- £19,000 to 21 Community Grants. Initially, £20,000 had been
earmarked for Food Strategy Community Grants over two financial years
(2022/23 and 2023/24). However, due to the popularity of the grants it
was agreed that the full amount would be allocated over one year
instead (2022/23).
- £205,000 has been set aside to provide one allotment site in the
Hamilton area. A report outlining options for the Hamilton area was
presented at the Climate Change and Sustainability Committee in
August 2022 and the next step is for planning applications to be
submitted.
Contextual £0.300m £0.277m £0.000m £0.000m £0.000m
Page 7 of 17
30

Page 31

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Strategy
Section 2: Project measures
Page 8 of 17
31

Page 32

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food at Home and in the Community
1. Supporting good food education and culture 2. Reducing food insecurity and poverty
Action Measures Comments/ Progress Status
Work in partnership with
community food
organisations and
partners to identify and
support the
development of
initiatives to tackle food
poverty
Activities developed to tackle food insecurity including
improving access to food and ensuring those accessing aid
receive the advice and support required
The cash first referral leaflet developed by the Independent Food Aid
Network in partnership with the council, Citizen Advice Bureau, local
food banks was launched in May 2022. It has been widely distributed
including at the Holiday Summer Hubs and in schools (with more that
5,000 leaflets ordered by schools).
In 2022, Summer Session Hubs ran within 14 locations for a duration
of 6 weeks with breakfast and lunch service served each day. 834
children from low income families participated with 22,828 meals
provided over the duration of the programme.
The Community Planning Partnership (CPP) Board also took the
decision to adopt a more integrated approach to food among partners
at its meeting in September 2022 and this includes “to work in
partnership in order to try to reduce the reliance on food banks faced
by people in situation of food poverty, within the area of influence of
local CPPs, by prioritising access to emergency financial assistance,
money advice and access to holistic support services”.
Information on key support available for people facing food insecurity
issues was also shared during the Challenge Poverty Week in October
2022.
A new Tackling Poverty officer has also joined the Community
Engagement Team with the remit to develop a Tackling Poverty Action
Plan.
Green
Page 9 of 17
32

Page 33

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food at Home and in the Community
1. Supporting good food education and culture 2. Reducing food insecurity and poverty
Action Measures Comments/ Progress Status
Deliver Kitchen Learning
Hub to service users of
the Unpaid Work
Service in collaboration
with Lanarkshire
Community Food and
Health Partnership
Increased number of service users participating in the hub
and gaining REHIS qualifications. Service users report
having more confidence to cook healthy meals for
themselves and family and report a better understanding of
nutrition and impact on their health and wellbeing
Kitchen Learning Hub (KLH) is an ongoing practical cooking and
nutrition education course for Auchentibber Community Payback
service users.
The service continues to have capacity for three service users per
week to attend KLH Mondays- Wednesdays. Lanark service users still
have the opportunity to attend remotely on Microsoft teams on
Thursdays and have ingredients delivered to them to ensure their
participation.
From March to September 2022, 169 service users have attended the
KLH sessions.
During the same period, 202 service users attended bread making
sessions that were delivered in-house every Thursday and Friday.
These sessions were led by a case manager and fresh baked bread
was donated to homeless organisations within South Lanarkshire.
Service users have reported feeling more confident in the kitchen and
sharing the food that they make with their families.
REHIS accreditations – this was not available to the service users
during this period as the allocated worker was not trained to deliver
this at the time. There is now a new worker in place who can facilitate
REHIS accreditations and service users who have missed this
opportunity can now undertake REHIS accreditations if they wish.
Green
Page 10 of 17
33

Page 34

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food at Home and in the Community
1. Supporting good food education and culture 2. Reducing food insecurity and poverty
Action Measures Comments/ Progress Status
Employ an educational
gardener to support
service users of Unpaid
Work Service
undertaking food
growing as part of their
unpaid work
Service users report increased knowledge and skills in
gardening and food growing. Opportunity to undertake the
Royal Caledonian Horticultural Society GLiN Award. Fruit
and vegetables grown are distributed to support foodbanks
and other community food initiatives promoting access to
locally grown affordable produce.
In March 2022, the Unpaid Work Service employed an Educational
Gardener to start a new project promoting a ‘seed to plate’ approach. It
allows service users to grow vegetables within Auchentibber grounds,
prepare food and receive education in relation to nutrition.
The set-up phase of the garden is now complete. The placement
started in October 2022 for four service users. As the project is in the
initial stages, the first harvest has been small and has been distributed
to service users and for use in the KLH.
An increased harvest is expected in line with the natural growth of the
project so that service users could be provided with their five
vegetables a day from the garden from Spring 2023. The increased
harvest will also benefit the community pantry in the future.
Green
Page 11 of 17
34

Page 35

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food in the Public Sector
3. Improving food in schools and in council properties 4. Improving food in public places
Action Measures Comments/ Progress Status
With the Sustainable
Food Procurement
group, support the
progress of the analysis
on the capability of
Lanarkshire F&D
businesses to supply
SLC
Progress of the analysis on the capability of Lanarkshire F&D
businesses to supply SLC
The analysis on the capability of local food and drink businesses to
supply food to the different council buyers was carried out from July to
October 2022 with consultations with council services, local
businesses and external partners. Results will be presented to council
officers in November 2022 when the recommendations and next steps
will also be discussed.
Green
Promote a food pledge
aligned with the SL
Good Food definition;
meeting the MSC, red
tractor and QMS
standards for fish,
chicken and red meat;
and meeting the
Nutritional
Requirements for Food
and Drink in schools
Food pledge promoted by March 2023 Complete - The food pledge is promoted on all menu promotional
materials and is also available on the council website.
Complete
Page 12 of 17
35

Page 36

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Economy
5. Supporting a good food retail and catering environment 6. Encouraging a fair and inclusive local food economy
Action Measures Comments/ Progress Status
Encourage networking
amongst the food and
drink sector
Demonstrated activities to encourage networking in the
sector
The council financially supports the local food and drink business
network "Lanarkshire Larder" (along with Scotland Food and Drink and
North Lanarkshire Council). The network arranges regular networking
events for the food and drink sector. It is now in its second year and
has over 60 members in this sector throughout Lanarkshire.
Green
Promote use of local
food produce (promotion
and events) across
business sectors
Demonstrated activities to promote local products Lanarkshire Larder has received funding from Scotland Food & Drink,
South Lanarkshire Council and North Lanarkshire Council to fund a
co-ordinator’s role to drive its activities. The network also received
funding from the Government’s Regional Food Fund to help with their
branding and funding from VisitScotland’s Destination, and Sector
Marketing Fund to create food trails across Lanarkshire to raise the
profile of businesses.
Lanarkshire Larder is also liaising with New College Lanarkshire to
encourage increased use of Lanarkshire produce. Economic
Development is also working with South Lanarkshire College about
them using more South Lanarkshire products.
Economic Development also worked with South Lanarkshire College
and E3 Hub South Lanarkshire to produce two promotional videos.
Video are available here:
What’s Fresh: https://youtu.be/vRMyHictNOg
Biggar Gin: https://youtu.be/G7XGdb5dg9s
Green
Page 13 of 17
36

Page 37

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Growing
7. Providing food growing opportunities 8. Promoting food growing and sustainability
Action Measures Comments/ Progress Status
Develop a council wide
Open Space Strategy
(OSS) including an
assessment of the
current quality and
location of food growing
opportunities and
identify potential suitable
areas where new or
improved provision
could be appropriate
Audit of existing open space provision to be completed by
mid 2022 and draft OSS by end 2022/2023
This audit of open space provision has been a significant piece of work
given the size of the Council area. Work on it is almost complete.
Following this, data needs to be analysed, a comprehensive
engagement exercise has to be carried out, and then the Open Space
strategy will be written.
Amber
Work with local
communities who are
preparing Local Place
Plans for their area to
identify opportunities
locally to meet any
aspirations related to
food growing
Corporate response developed and in place by end of Q2 The development of the Local Place Plans is dependent on local
communities indicating their desire to prepare such plans. To date
interest has been low. Planning will shortly be publishing information
on the Council website alerting the public to the new legislation on
Local Place Plans and hope to improve interest in this way.
Amber
Ensure embedding of
health and wellbeing
issues in the preparation
of Local Development
Plan 3 in accordance
with the NPF4 and
consider the need for
interim supporting
planning guidance
Progress in the development of the LDP (5 year process with
preparation of the Evidence Report commencing later in
2022 including evidence on Lifelong Health and Wellbeing)
Publication of planning guidance for any new policy areas
emerging from the new National Planning Framework as an
interim measure
Preparation of Local Development Plan (LDP) 3 will formally
commence when the final version of the Scottish Government's LDP
Regulations is issued. This is expected to be early 2023. Work has
started on data collection and meetings with other services and
stakeholders are taking place to establish the evidence base for the
LDP.
Green
Page 14 of 17
37

Page 38

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food for the Environment
9. Reducing food waste and packaging 10. Limiting the impact of food system on the environment and climate change
Action Measures Comments/ Progress Status
Consider extending the
food waste collection
service
Review of existing service provision and identification of
costs associated with extending the service to rural areas or
identify alternatives to help residents manage food waste
The final decision on extending the food waste collection service in
rural areas will be dependent on the outcome of the council’s charging
review and waste review. However, to increase recycling of food waste
in rural areas, the service has completed a tender process to purchase
‘hot composters’ as an alternative to extending the food waste.
Green
Revise the content of
the presentations
provided by the Waste
Education Team to
schools in South
Lanarkshire to include
information about food
waste reduction and
recycling
Educational material updated by March 2023 including
criteria to assess the impact of the educational programme
Waste Education have reviewed the content that they present at
primary schools and have included a section on the 'food waste
journey'. Emphasis also being put on the need to reduce food waste
(not just to treat it after it has been produced).
Waste Educational Team also provided support to Education to
deliver-mini-COP events at two Special Educational Needs Schools
(Rutherglen High School and Sanderson High School). The company
Enva (who treats council food/garden waste and make compost)
supplied compost for the pupils to plant spring bulbs.
Green
Continue to reduce the
council's reliance on
avoidable single-use
plastic items for food
Actions to reduce the reliance on single-use plastic items for
food across the council
Facility Services is meeting the Environmental Protection (Single-use
Plastic Products) (Scotland) Regulations 2021 introduced in 1 June
2022.
To meet the new legislation, any single use plastic products affected by
the regulation were replaced with products made from more
sustainable materials.
More information on the reduction of single use item reduction can be
found in the Climate Change and Sustainability Committee report
presented on 31 August 2022 (Item 12).
Green
Undertake campaigns
promoting sustainable
food to Council
employees and South
Lanarkshire residents
Type of campaigns promoting sustainable food Seasonality food calendars were published on social media and
intranet until August 2022.
The Too Good Too Go app was also promoted to employees via
emails.
Green
Page 15 of 17
38

Page 39

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Governance
11. Developing and strengthening food partnerships 12. Making good food a priority in the council's area
Action Measures Comments/ Progress Status
Promote Fairtrade
principles in the
council’s area together
with members of the
Fairtrade Zone Status renewed by August 2022 The Fairtrade Zone Status of the council was automatically renewed
this year by the Fairtrade Foundation.
Green
Fairtrade steering group
and renew the Fairtrade
Zone status of the
council
Demonstrated activities promoting Fairtrade principles On the occasion of World Fair Trade Day in May 2022, the council
supported the SL Fairtrade steering group with the organisation of a
Fairtrade lunch in the Hillhouse community centre in Hamilton
organised with St Ninian's Primary School.
Most of the activities promoting Fairtrade take place during the
Fairtrade Fortnight in February each year.
Green
Encourage and facilitate
information sharing
among participants of
the Good Food Forum
and encourage a
partnership approach to
progress the objective of
the food strategy
Demonstrated activities to encourage and facilitate
networking and partnership
The 'South Lanarkshire Good Food Forum discussion list' made of 52
food stakeholders in the council area is regularly used to share
information such as the development of new local food initiatives or
funding opportunities. Support was also provided to several council
and non-council food initiatives, and contacts, shared with the
objective of increasing networking and partnership.
Green
Page 16 of 17
39

Page 40

IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
IMPROVe - SLC Performance Management System                                                                                                                                                                       Report printed on Tuesday 11 October 2022 11:51:02am
Good Food Strategy actions and measures (level 2)
Good Food Governance
11. Developing and strengthening food partnerships 12. Making good food a priority in the council's area
Action Measures Comments/ Progress Status
Pilot the Fork to Farm
dialogue meetings to
increase understanding
and collaboration
between the local
farming community and
the council
Demonstrated activities to increase understanding and
collaboration between the local farming community and the
council
Several Fork to Farm Dialogue meetings were organised with local
farmers, council officers and other representatives from key
organisations (NFU, RHET and Lanarkshire Larder).
These meetings led to the identification of key potential areas of
collaboration between the farming community and the council.
The Local Action Group implementing the Rural Community Led Local
Development Programme will now consider how they can link in with
the Farm to Fork group, collaborating with them and
consulting/involving them in relevant projects, and considering the
provision of funding to them.
Green
Work with partners
including the Community
Planning Partnership to
define and implement
collective actions to
progress the objectives
of the Good Food
Strategy
Demonstrated actions to increase partnership working
among partners
Following a workshop organised in June 2022 with the Progress Group
of the Community Planning Partnership (CPP) to discuss how to adopt
a more strategic approach to food among partners, recommendations
were presented and approved by the CPP Board in September 2022.
Recommendations include: (1) mainstreaming and promoting Good
Food across the partnership; (2) sharing more information on local
food initiatives and increasing networking among partners and within
the community; (3) sharing information among partners on priority
areas and key areas of influence and considering the development of
collective actions; (4) engaging with communities to support them in
the development of healthier, fairer, and more sustainable food
systems; (5) holding further discussions following future local and
national policy developments. The implementation of these
recommendations will be discussed with the Progress Group.
Green
Conduct a mid-term
review of the Good Food
Strategy
Publication of the mid-term review report The midterm review of the Good Food Strategy will be conducted later
this year.
Report Later
Page 17 of 17
40

Page 41

Report
Agenda Item 
Report to: Climate Change and Sustainability Committee
Date of Meeting: 9 November 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Public Bodies Climate Change Duties Annual Report
2021/2022 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 Present the Council’s annual Public Bodies Climate Change Duties report for
2021/2022, as legally required under the Climate Change (Scotland) Act 2009
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s): -
[recs]
(1) that the Council’s annual Public Bodies Climate Change Duties report for
2021/2022 is approved
[1recs]
3. Background
3.1. The Climate Change (Scotland) Act 2009 commits the government to reduce
Scotland’s greenhouse gas and develop long-term measures to adapt to changes in
the climate. The Climate Change Act 2019 commits Scotland to meet or exceed a
net-zero carbon emissions target by 2045. 
3.2. The Acts place duties on all public bodies in Scotland to reduce greenhouse gas
emissions, adapt to a changing climate, and act sustainably. Public bodies are
required to prepare annual reports on their compliance with these duties and publish
and submit these reports to Scottish Government. 
3.3. The Council has complied with the statutory reporting requirement every year since
its introduction in 2015, however has also been reporting climate change action on a
voluntary basis since 2007 as signatories of Scotland’s Climate Change Declaration. 
4. Climate Change Duties Report 2021/2022
4.1. The report requires approval by the Climate Change and Sustainability Committee to
publish the report on the Council’s website and submit to the Scottish Government
by 30 November 2022.   
4.2. The report is in a similar format as previous years and is based on a template issued
by Scottish Government. It contains six sections - 
5
41

Page 42

1 Organisational Profile Provides a better understanding of the scale of activity
of the body in addressing climate change in relation
to its size
2 Governance and
Management
Seeks to establish how governance of climate change
is recognised within the organisation.  Also, the
reporting and review structure and the level of
engagement between leaders, department
managers, practitioners and staff generally
3 Corporate Emissions Provides data on corporate emissions relating directly
to the organisation’s assets and activities
4 Adaptation Seeks to establish if the body has assessed the risks
that both current and future climate change presents
to its assets, infrastructure, service provision and
business continuity. Also, to identify actions that will
reduce risk both now and, in the future. 
5 Procurement  Clarify how sustainable procurement policy has had
an impact on climate change reduction, reporting and
compliance issues 
6 Validation  It is expected that validation of quantitative and
qualitative information is regarded as good business
practice and risk management of any inaccuracies or
inconsistencies that could result in legal challenge or
reputational damage 
4.3. A copy of the draft Climate Change Duties report for 2021/2022 can be found at
Appendix 1.   
4.4. Some highlights from the 2021/2022 report include: 
 Carbon reductions of 64% have been reported in 2021/2022 compared to the
baseline year of 2005/2006
 Significant levels of renewable energy are being generated and consumed in
our buildings from solar PV and biomass
 The residual waste contract has enabled a large proportion of our non-
recyclable waste to be sent to the Energy from Waste plant, not only reducing
landfilled waste but creating electricity
 We have a robust climate change and sustainability governance structure led
by the Climate Change and Sustainability Committee and supported by the
Climate Change and Sustainability Steering Group
 We have a robust Strategic Environmental Assessment process that ensures
that all plans, polices and strategies undergo an environment assessment which
includes considering climatic factors
 The report details how many of our plans, polices and strategies demonstrate
our commitment to meeting our climate change duties
 South Lanarkshire Council’s participation in the Climate Ready Clyde
partnership which is a collaborative initiative with an adaptation strategy and
action plan for the Glasgow City Region (which includes all of South
Lanarkshire’s rural and urban areas) 
42

Page 43

4.5. The information contained in section 3 of the report details the Council’s own carbon
footprint which is measured from five sources: energy consumption from buildings,
disposal of household waste, energy consumption from street lighting, emissions
associated with fleet and staff travel. 
4.6. The information contained in section 4 details how the Council assesses risks from
climate change and how we are adapting to changes in the climate. The plans and
policies which we have to do this include our risk management strategy, business
continuity plan, core path plan, local development plan and local transport strategy. 
5. Employee Implications
5.1. The Council’s Sustainable Development and Carbon Management officers prepare
the annual climate change report in conjunction with relevant Council Resources. The
statutory reporting regime has elevated the importance and accountability of climate
change reporting within the Council.   
6. Financial Implications
6.1. Collection of climate change information is a core management task and, therefore,
is absorbed into the daily business operations. 
7. Climate Change, Sustainability and Environmental Implications 
7.1 The Council’s Sustainable Development and Climate Change Strategy outlines the
action to meet our climate change duties and has undergone a full strategic
environmental assessment (SEA).  This can be found on the Scottish Government’s
SEA Gateway database. 
8. Other Implications
8.1. The annual statutory reporting requirements have implications for all Resources,
however, the following Services will have more involvement: – 
 Community and Enterprise Resources - Sustainable Development and Carbon
Management, Fleet Services, Environmental Services, Roads and
Transportation, Flood Risk Management, Street Lighting, Waste Services,
Resilience Support, Countryside and Greenspace, Planning and Building
Standards
 Finance and Corporate Resources – Procurement, Finance (Capital
Investment), Risk Management
 Housing and Technical Resources - Energy Management, Asset Management
and Property Services 
8.2. Climate Change and carbon reduction targets are included in the Council’s top risks. 
9. Equality Impact Assessment and Consultation Arrangements
9.1. An equality impact assessment was carried out on the Sustainable Development and
Climate Change Strategy 2017-2022. 
David Booth
Executive Director 
18 October 2022 
43

Page 44

Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Good quality, suitable and sustainable places to live
 Thriving business, fair jobs and vibrant town centres
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: - 
Name: Julie Richmond
Designation: Carbon Management Officer
E-mail : julie.richmond@southlanarkshire.gov.uk  
44

Page 45

Appendix 1 
Public Sector Climate Change Duties 2021-22 Summary Report: South Lanarkshire Council
Required section of the annual report 
If you need this information in another language or format, please contact us to discuss how we
can best meet your needs. 
Phone 0303 123 1015 
Email equalities@southlanarkshire.gov.uk  
45

Page 46

Part 1: Profile of reporting body 
1(a) Name of reporting body South Lanarkshire Council 
1(b) Type of body Local Government 
1(c) Highest number of full-time equivalent staff in the body during the report year 12,486 
1(d) Metrics used by the body Specify the metrics that the body uses to assess its
performance in relation to climate change and sustainability 
Metric Unit Value Comments
Population size served population 322,630 Figure taken from mid-year estimate 
Other (Please specify in
the comments)
other (specify in
comments)
3.7 The Council's carbon footprint in tonnes per
number of employees (per head) for 2021-
22
Other (Please specify in
the comments)
other (specify in
comments)
3.3 South Lanarkshire area wide carbon
emissions per capita (tonnes) – 2020 latest
estimated figure available (two-year lag)
released in June 2022 from BEIS 
1(e) Overall budget of the body   Specify approximate £/annum for the report year 
£787,975,000 The budget represents the year end budget from our 2021-22 outturn report and
excludes the COVID GRG funding 
1(f) Report year    Financial (April to March) 
1(g) Context Provide a summary of the body’s nature and functions that are relevant to
climate change reporting. 
South Lanarkshire is Scotland's fifth largest local authority in terms of population with 322,630
(2021 mid-year estimate) residents living with 149,864 households (2021 figure).  The Council
covers 180,000 hectares of land stretching from almost the centre of Glasgow to the Scottish
Borders.  The area has a mix of urban, rural, and former mining environments - almost 80% is
classed as agriculture but 70% of the population live in the major settlements in the north.   
There are four towns in South Lanarkshire with a population of more than 20,000 (East Kilbride,
Hamilton, Rutherglen and Cambuslang) and a further 23 towns and settlements with a population
of over 1,000. 
South Lanarkshire is divided into 20 electoral wards which are represented by 64 Councillors who
are responsible for agreeing the Council's plans and policies and deciding how the Council's
budget should be spent. 
The Council provides services for everyone in this large and diverse geographical area from five
Resources:- 
Community and Enterprise Resources - comprises various services operating from a wide variety
of locations throughout South Lanarkshire.  The diverse range of services contributes significantly
to the quality of life experienced by both residents and visitors to South Lanarkshire.  Activities
include:- maintaining the road and active travel networks, waste disposal and recycling services,
street cleaning and maintaining open spaces, promoting economic development, planning and
building standards, environmental health, trading standards, facilities services within schools and
council offices, bereavement services, fleet, and leading the development and promotion of
sustainable development and climate change action.
46

Page 47

Education Resources – is South Lanarkshire Council’s biggest service.  There are 53,000 young
people attending nursery, primary, secondary and additional support needs schools in South
Lanarkshire.  Education is both a national and local priority.  The service aims to raise achievement
and attainment and improve young people’s health and wellbeing.  The main focus is on raising
standards, particularly in numeracy and literacy and in closing the gap between the most and least
disadvantaged children so that every child has the same opportunity to succeed.  Also, to provide
young people with the necessary skills for life and work. 
Finance and Corporate Resources – provides the framework of support which allows the Council to
deliver its wide range of services on behalf of local people.  Services throughout the Resource
include: - overseeing the Council’s budget, revenue, Customer Services Centre, digital
transformation, human resources, registrars and licencing, audit, communications, and legal
services 
Housing and Technical Resources – is the fourth largest social landlord in Scotland and delivers a
range of key housing management, homelessness, and property and repairs services.  Activities
include: - managing a stock of 25,328 dwellings, support to prevent and alleviate homelessness,
adapting homes for independent living, maintenance, repair and improvements to the Council’s
properties and asset management. 
Social Work Resources – supports social welfare and provide effective care and support to meet
the needs of vulnerable people in South Lanarkshire.  Activities include: assessment and support,
targeted services for vulnerable children, young people and adults, providing care at home,
community support services, respite and residential services and supporting carers. 
South Lanarkshire Leisure and Culture – is a charitable Trust set up by South Lanarkshire Council
to deliver a range of services including: operation, management and development of indoor and
outdoor sport and leisure facilities, community halls, arts venues, country parks, libraries and
museum services.   
The scope of South Lanarkshire Council's carbon footprint includes the energy used in our
buildings, household waste sent to landfill and for processing/recycling, the fuel used in our fleet of
vehicles, energy used for our street lighting and miles travelled as business travel. These are
considered the most appropriate sources to measure with robust data collected and converted into
carbon using the carbon conversion factors published each year by Department for Business,
Energy and Industrial Strategy (BEIS), formerly Department of Energy and Climate Change
(DECC). 
The data includes that of South Lanarkshire Leisure and Culture Ltd. 
47

Page 48

Part 2: Governance, management and strategy
2(a) How is climate change governed in the body?   Provide a summary of the roles
performed by the body’s governance bodies and members in relation to climate change. If
any of the body’s activities in relation to climate change sit outside its own governance
arrangements (in relation to, for example, land use, adaptation, transport, business travel,
waste, information and communication technology, procurement or behaviour change),
identify these activities and the governance arrangements. 
Sustainable Development, including climate change duties compliance is a priority objective for the
Council; this is reflected in the Council Plan and the Council's Sustainable Development and
Climate Change Strategy (SDCCS).   
The Climate change agenda is governed through the Council's Climate Change and Sustainability
Committee which has decision making powers to help to accelerate the pace and scale of action
needed in response to the climate emergency and meet challenging climate change national
targets.   The committee is supported by the Climate Change and Sustainability Steering Group
which is made up of senior managers from all Council Resources and has responsibility for
overseeing the implementation of the SDCCS; compliance with the climate change duties;
embedding sustainable development within Council policy; and the scrutiny of performance
monitoring reports.  Progress on the Council's SDCCS and complying with our climate change
duties are reported to the Climate Change and Sustainability Committee bi-annually using
IMPROVe (the Council's performance management system). 
The Strategic Environmental Assessment (SEA) Corporate Working Group continues to operate
and is a cross-resource group that works together to ensure that all plans, polices and strategies
undergo the SEA process which includes climatic factors.  The SEA group feeds in to the steering
group and reports progress of the Council’s SEA process to the climate change and sustainability
committee. 
In addition to the steering group and SEA working group, there are additional Project Review
Groups (PRGs).  The PRGs work on projects that will drive forward climate change mitigation and
adaptation and deliver the outcomes in the sustainable development and climate change strategy. 
The project group themes are agreed by the Climate Change and Sustainability Steering Group
and consist of relevant officers to deliver the outcomes of the project within the set timescales. 
There is a lead officer identified for each project group depending on the specific project or theme. 
The groups include officers with the technical expertise of the specific subject/theme and
representatives from procurement, finance, IT, communications and planning (if required) to enable
the delivery of the project. 
48

Page 49

The following diagram outlines governance, management and strategy for the Council: - 
Executive
Committee
Council strategies, plans, policies and programmes
most directly relevant to sustainable development
outcomes: 
• Air Quality Strategy
• Asset Management Plan
• Biodiversity Duty Implementation Plan
• Carbon Management Plan
• Contaminated Land Strategy
• Cycling Strategy
• Energy Framework
• Food Growing Strategy
• Good Food Strategy
• ICT Strategy
• Local Development Plan
• Local Housing Strategy
• Local Transport Strategy
• Outdoor Access Strategy
• Procurement Strategy
• Waste Contract
Connect 2017 - 2022 
The Council Plan
Resource
Plans 
Sustainable
Development &
Climate Change
Strategy 
Climate Change and
Sustainability
Committee
Corporate
Management
Team
Climate Change and
Sustainability Steering Group 
Strategic
Environmental
Assessment (SEA)
Corporate
Working 
Group 
Climate Change and
Sustainability 
Project Review Groups 
49

Page 50

2(b) How is climate change action managed and embedded by the body? Provide a
summary of how decision-making in relation to climate change action by the body is
managed and how responsibility is allocated to the body’s senior staff, departmental heads
etc. If any such decision-making sits outside the body’s own governance arrangements (in
relation to, for example, land use, adaptation, transport, business travel, waste, information
and communication technology, procurement or behaviour change), identify how this is
managed and how responsibility is allocated outside the body 
Sustainable Development and Carbon Management sits within the Performance and Development
Team of Community and Enterprise Resources.  The sustainable development officer and carbon
management development officer have a strategic overview of the Council's progress to reduce
carbon emissions, climate change adaptation and environmental sustainability.  The Performance
and Development team acts as a centre of expertise on climate change for the Council and works
with Services across the Council to build capacity on climate change awareness.   
Reports on climate change produced by the team are reviewed by the Head of Service prior to
being presented to the Corporate Management Team, which includes the Chief Executive and
Executive Directors for all Resources. Progress reports are submitted to the climate change and
sustainability committee bi-annually. 
The Performance and Development team are responsible for developing the SDCCS and carbon
management plan (CMP).  The development of both documents is done in conjunction with all
Resources and they provide a basis from which elected members and officers can demonstrate
strong and effective leadership in environmental sustainability and climate change actions.   
Actions within the SDCCS action plan are monitored and reported using the Council's IMPROVe
system.  The SDCCS action plan is reported bi-annually to the corporate management team and
the climate change and sustainability committee - previously the SDMOWG and Executive
Committee - using the progress update in IMPROVe.  Many of the SDCCS actions are embedded
in Resource and Service plans which results in many employees having climate change actions
included in their key work objectives as part of their annual performance development review.   
The Council also has a ‘Behaviours Framework’ which sets out 5 key principles of how employees
are expected to approach their work.  The first principle is ‘Efficient’ which includes taking action to
ensure sustainability and minimising environmental impact.  Employees have to evidence how they
contribute to this principle as part of their annual review.  The Behaviours Framework helps to
embed sustainability and climate change consideration in the culture of the Council.   
The Council has corporate key performance measures that all Resources have to comply with that
contribute to meeting the climate change duties, these include: reducing fuel vehicle emissions,
reducing the use of single-use plastics and reporting new or ongoing sustainable development and
climate change activity within the Resource.  Each Resource reports progress on these measures,
on a quarterly basis using IMPROVe, to each Resource’s committee. 
The Council has taken a number of steps to further embed climate change action across the
organisation. This includes staff engagement and awareness activities including the development
of an e-learning module on climate change and sustainability, climate change and sustainability
session in the management development programme, an SEA webinar and regular articles in the
staff intranet.  There is also an annual programme of events and campaigns focused on climate
change including Earth Hour, Cycle to Work Week, Recycle Week, Climate Week, and Sustainable
South Lanarkshire. 
The SEA Corporate Working Group provides a mechanism to liaise with Services to ensure that
relevant plans, polices and strategies include the climate change duties considerations and any
actions accordingly. 
The Sustainable Development Officer is also part of the Council's procurement network and has
been working with procurement colleagues to review the Sustainable Procurement Policy to
include further guidance on climate change and sustainability within the procurement process.
50

Page 51

The following diagram outlines how climate change is managed and embedded in the Council: - 
2(c) Does the body have specific climate change mitigation and adaptation objectives in its
corporate plan or similar document?  Provide a brief summary of objectives if they exist.
Objective Doc Name Doc Link
We have 3 priorities - People
Progress and Planet. 
Planet – we need to work towards a
sustainable future in sustainable
places
We will act in ways that protect our
natural world for a healthier future.
We will work together to develop
local solutions to protect nature and
to take action on climate change
and support our young people to
lead the way.
The Council’s Corporate
Plan: Connect 2022-2027
page 10
https://www.southlanarkshire.gov
.uk/downloads/file/15714/connect
_council_plan_2022-27_odt 
2(d) Does the body have a climate change plan or strategy?  If yes, provide the name of any
such document and details of where a copy of the document may be obtained or accessed. 
The Council's Sustainable Development and Climate Change Strategy (SDCCS) 2017-2022 set
out our overall approach to sustainable development and challenges and opportunities of climate 
Executive Committee 
Chief Executive
Climate Change and
Sustainability 
Steering Group
Climate Change and
Sustainability
Committee 
Executive Director
of Education
Resources  
Executive
Director of
Finance and
Corporate
Resources
Executive
Director of
Housing and
Technical
Resources
Executive Director
of Community and
Enterprise
Resources
Head of Service 
Performance and Development Team
• Performance and Development Manager
• Sustainable Development Officer
• Carbon Management Development Officer 
Corporate Management
Team
Executive
Director of Social
Work Resources 
Strategic
Environmental
Assessment (SEA)
Corporate
Working 
Group
Climate Change and
Sustainability 
Project Review
Groups
51

Page 52

change.  It outlined the changes in sustainable development and climate change policy since the
publication of the last strategy, and the Council's strategic outcomes for sustainable development
and climate change over a five year period.  This was the Council's third strategy, the first was
published in 2007, and covers the actions taken throughout the reporting period FY 2021-22 for
this report.
https://www.southlanarkshire.gov.uk/downloads/file/12055/sustainable_development_and_climate_
change_strategy_2017-2022   
After considerable consultation the sustainable development and climate change strategy has
been renewed and covers the period April 2022 to March 2027. 
The Council's Carbon Management Plan (CMP) update 2018 provides details of what we aimed to
achieve for carbon reduction.  The Council's first CMP was published in 2008, with updates
published in 2012, 2014 and 2016.  The CMP has been refreshed and no longer published as a
standalone document, instead incorporated into the new sustainable development and climate
change strategy 2022-2027. 
https://www.southlanarkshire.gov.uk/downloads/file/12689/carbon_management_plan_2018   
The Council also has an 'Environmental Statement' which is relevant for all employees and sets
out the Council's environmental commitments as per the sustainable development and climate
change strategy.  Climate change is one of the key considerations in the statement and information
is included on how employees can contribute to meeting the commitments. 
2(e) Does the body have any plans or strategies covering the following areas that include
climate change?  Provide the name of any such document and the timeframe covered. 
Topic Document Link Time
Period
Comments
Adaptation Local
Development
Plan
Local Development
Plan
202-2025 Climate adaptation is
embedded throughout the
plan – in particular Policy 1
Spatial Planning, Policy 2
Climate Change, Policy 13
Green Network and
Greenspace, and Policy 16
Water Environment and
Flooding
Adaptation Biodiversity
Strategy
Biodiversity
Strategies and plans
2018-2022 Climate change adaptation
is incorporated into Chapter
3: Our eco-systems and
challenges
Adaptation Local
Transport
Strategy
Local Transport
Strategy
2013-2023 LTS includes adaptation
through Flood Risk
Management
Adaptation Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Strategic Outcome:  The
Council’s strategies, plans
and policies support
communities to live more
sustainably, reduce carbon
emissions and adapt to
changing climate
Adaptation Local Flood
Risk
Management
Plans
(LFRMP) -
Clyde and
Flooding advice and
support
2016-2022 The Flood Risk
Management team also
have 'Response to Flooding'
procedures
52

Page 53

Loch Lomond,
and Tweed
Business Air quality
Action plan
Air Quality Action
Plan 
The air quality action plan
includes a number of
measures to encourage a
shift to walking, cycling and
public transport instead of
the reliance of private car
Business Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the Strategy’s
framework to achieve the
outcomes (Appendix 3):
Continue to improve the
efficiency of our business
travel and promote more
sustainable travel options for
employees
Staff Travel Employee
Travel Plan
Employee Travel
Plan
Published
2013
The staff travel plan was
refreshed in March 2020
however was not published
due to Covid-19.  Changes
in working arrangements for
employees will require the
employee travel plan to be
reviewed again
Energy Efficiency Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the Strategy’s
framework to achieve the
outcomes (Appendix 3):
Continue to implement
energy efficiency measures
across Council facilities
including investment in
renewable and low carbon
energy solutions
Energy Efficiency Carbon
Management
Plan
Carbon Management
Plan 2018
2018 Energy from the Council’s
buildings and street lighting
are two of the sources of
carbon emissions within the
boundaries of the Council’s
carbon footprint
Energy Efficiency Local Housing
strategy
Local Housing
Strategy
2017-2022 Chapter 2: Housing Quality
and Energy Efficiency
Fleet Transport Air Quality
Action Plan
Air Quality Action
Plan 
South Lanarkshire provide
fleet operators, including the
Council's own fleet, free
access to assessment and
tailored guidance to assist
fleet operators in becoming
more economic in terms of
fuel, emissions and costs
Fleet Transport Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the Strategy’s
framework to achieve the
outcomes (Appendix 3):
Implement measures within
the Council’s fleet to
contribute to the Scottish
Government's ambition of
the decarbonisation of road
transport
53

Page 54

Renewable energy Local
Development
Plan
Local Development
Plan
2020-2025 Policy 1 Spatial Planning,
Policy 2 Climate Change,
Policy 18 Renewable Energy
Renewable energy Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the Strategy’s
framework to achieve the
outcomes (Appendix 3):
Supporting renewable
energy generation across
South Lanarkshire helping to
reduce the area’s carbon
emissions and promote
economic growth
Sustainable/Renewable
Heat
Local
Development
Plan
Local Development
Plan
2020-2025 Sustainable/renewable heat
is included in Policy 2
climate change
Waste Management Local
Development
Plan
Local Development
Plan
2020-2025 Policy 2 Climate Change
and Policy 18 Waste
Waste Management Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the of the
Strategy’s framework to
achieve the outcomes
(Appendix 3): Continue to
divert waste from landfill by
providing and encouraging
the effective use of waste
management services
across South Lanarkshire
Waste Management Carbon
Management
Plan
Carbon Management
Plan 2018
2018 Household waste is one of
the sources of carbon
emissions within the
boundaries of the Council’s
carbon footprint
Land Use Local
Development
Plan
Local Development
Plan
2020-2025 Land use is featured
throughout the LDP however
the most relevant policies
are Policy 1 Spatial Strategy
Policy 2 Climate Change
Policy 13 Green network
and greenspace
Land Use Sustainable
Development
and Climate
Change
Strategy
Sustainable
Development and
Climate Change
Strategy
2017-2022 Included in the Strategy’s
framework to achieve the
outcomes (Appendix 3):
Ensure our planning and
land use policies protect and
enhance the natural
environment and ecosystem
services
Other (please specify in
comments)
Air Quality
Action Plan
Air Quality Action
Plan 
The air quality action plan
includes a measure to
incorporate green
infrastructure integration to
reduce emissions within air
quality management areas
Other (please specify in
comments)
Procurement
Strategy
Procurement
Strategy
2020-2023 Sustainable Procurement -
Includes contribution to
sustainable procurement
duty and the climate
emergency
54

Page 55

2(f) What are the body’s top 5 priorities for climate change governance, management and
strategy for the year ahead?  Provide a brief summary of the body’s areas and activities of
focus for the year ahead. 
1. Deliver a package of climate literacy training for key council officers, elected members and the
wider employee workforce 
2. Finalise the sustainable development and climate change strategy 2022-2027 action plan
3. Implement the 2022-23 action plan for the Sustainable Development and Climate Change
Strategy
4. Establish Project Review Groups to work on specific projects/pilots that contribute to meeting
the Council’s sustainable development and climate change strategy outcomes
5. Continue the work with the Climate Ready Clyde partnership to develop a city region
adaptation strategy and action plan 
2(g) Has the body used the Climate Change Assessment Tool (CCAT) (a) or equivalent tool
to self-assess its capability - performance?  If yes, please provide details of the key findings
and resultant action taken. 
A self-evaluation using CCAT was carried out in June 2021 as part of the development of the next
sustainable development and climate change strategy. The key findings are as follows: 
Overall results - Run 3  
Organisation
score
Total score
available
Percentage
score
Traffic light
assessment
Governance 22 28 79% 79%
Emissions 17 30 57% 57%
Adaptation 20 27 74% 74%
Behaviour 14 20 70% 70%
Procurement 6 16 38% 38%
Overall 79 121 65% 65% 
55

Page 56

Our focus areas continue to be Emissions and Procurement. 
We now have a target for direct and indirect emissions and have plans to develop a route map for
future emission reductions, however this is dependent on the outcomes from a number of feasibility
/ pilot studies being undertaken. 
In terms of procurement, we know that climate change needs to be embedded more within our
procurement practices.  Focus will be given to progressing with sustainable procurement actions
as identified through the Flexible Framework action plan; training opportunities on use of
prioritisation and sustainability tools; updating our Sourcing Strategy to further embed sustainability
measures from evaluation to contract management; and using the prioritisation tool undertake
prioritisation assessments for construction, social care and information technology categories.   
We will also further our progress on adaptation and behaviour change through our new strategy
and action plan. 
2(h) Supporting information and best practice   Provide any other relevant supporting
information and any examples of best practice by the body in relation to governance,
management, and strategy. 
It was agreed at a full Council meeting on 25th September 2019 that a climate change and
sustainability committee would be established.  This was in response to both the UK and Scottish
Governments declaring a climate emergency in May 2019 and new national climate change targets
introduced of net-zero greenhouse gas emissions by 2050 and 2045 respectively. 
To support the work of the committee a cross-Resource climate change and sustainability steering
group was established to provide senior-level management and guidance on the action required in
the Council’s transition to a net-zero economy and society, help to build resilience to climate risks,
and address the climate emergency.  In addition to the steering group, climate change and
sustainability project review groups are established to work on specific projects to help deliver the
outcomes in the sustainable development and climate change strategy.  The project groups have
an identified lead and work within set timescales to meet set outcomes and regular progress of
each of the projects is reported regularly to the steering group and in turn to the climate change
and sustainability committee.  
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Governance Emissions Adaptation Behaviour Procurement Overall
South Lanarkshire Council (Run 3)
56

Page 57

South Lanarkshire Council is represented on the Sustainable Scotland Network Steering Group
and has been an active member of the network with participation in both Finance and Reporting
Action Groups and presenting at member events.   
57

Page 58

Part 3: Emissions, targets and projects
3a Emissions from start of the year which the body uses as a baseline (for its carbon
footprint) to the end of the report year 
Referenc
e Year
Year Scope1 Scope2 Scope
3
Total
tCO2e
Comments
Baseline
carbon
footprint
2005-
06
42,014 50,836 63,115 155,965 Water is not included. Emission
factors were set at baseline year and
have not been updated for any
subsequent year. Scope 1= buildings
gas and oil and fleet. Scope 2=
buildings and street lighting
electricity. Scope 3=waste, staff
travel. 
Year 1  2006-
07
40,119 49,806 61,956 151,881 Comment as above (in baseline
year)
Year 2 2007-
08
39,655 52,085 59,597 151,337 Comment as above (in baseline
year)
Year 3  2008-
09
38,168 52,797 56,658 147,623 Comment as above (in baseline
year)
Year 4  2009-
10
41,637 50,846 52,349 144,832 Comment as above (in baseline
year)
Year 5  2010-
11
40,263 50,645 50,356 141,264 Comment as above (in baseline
year)
Year 6  2011-
12
36,510 51,081 47,665 135,256 Water is not included. Emission
factors were set at baseline year and
have not been updated for any
subsequent year. Scope 1= buildings
gas and oil and fleet Scope 2=
buildings and street lighting
electricity. Scope 3=waste, staff
travel and pool cars.
Year 7  2012-
13
39,999 53,216 46,226 139,441 Comment as above (in year 2011-12)
Year 8  2013-
14
37,119 51,383 47,513 136,015 Comment as above (in year 2011-12)
Year 9  2014-
15
35,269 47,850 42,084 125,203 Comment as above (in year 2011-12)
Year 10  2015-
16
35,498 45,071 39,707 120,276 Comment as above (in year 2011-12)
Year 11  2016-
17
34,017 38,950 37,927 110,894 Comment as above (in year 2011-12)
Year 12 2017-
18
34,599 36,860 42,656 114,115 Comment as above (in year 2011-12) 
Year 13 2018-
19
32,863 35,378 31,942 110,183 Comment as above (in year 2011-12)
Year 14 2019-
20
33,583 14,966 18,783 67,282 Water is not included. Emission
factors are updated annually. Scope
1= buildings gas and oil and fleet
Scope 2= buildings and street
58

Page 59

lighting electricity. Scope 3=waste,
staff travel and pool cars
Year 15 2020-
21
32,530 12,256 9,805 54,591 Comment as above (in year 2019-20)
Year 16 2021-
22
31,989 11,807 12,002 55,798 Comment as above (in year 2019-20) 
3b Breakdown of emission sources - complete the following table with the breakdown of
emission sources from the body's most recent carbon footprint (greenhouse gas
inventory); this should correspond to the last entry in the table in 3(a) above. Use the
'Comments' column to explain what is included within each category of emission source
entered in the first column. If, for any such category of emission source, it is not possible to
provide a simple emission factor(a) leave the field for the emission factor blank and provide
the total emissions for that category of emission source in the 'Emissions' column. 
Total 58,703 Figures in this section do not match the total in section 3a due to differing conversion
factors used in 3a (3a uses 2022 factors and 3b uses 2021 factors). Home working and biomass
emissions are included in 3b but not in 3a. 
Emission source Scope Consumption
data
Units Emissions
(tCO2e)
Units Source
Grid Electricity
(generation)
2 52,771,028  kWh 11,204.9  kg CO2e/kWh Buildings
Grid Electricity
(transmission
distribution losses)
3 52,771,028  kWh 991.6  kg CO2e/kWh Buildings
Natural Gas 1 130,587,218  kWh 23,918.4  kg CO2e/kWh Buildings
Gas Oil 1 6,035,110  kWh 1,549.8  kg CO2e/kWh Buildings
Biomass 1 5,132,550  kWh 77.7 kg CO2e/kWh Buildings
Refuse Municipal to
Landfill
3 20,061  tonne
s
8,952.1 kg CO2e/tonne Waste
Refuse Municipal to
combustion
3 74,260  tonne
s
1,581.3 kg CO2e/tonne Waste
Refuse Municipal to
mixed recycling
3 49,265  tonne
s
1,049.0 kg CO2e/tonne Waste
Refuse Municipal to
composting
3 19,693  tonne
s
176.3 kg CO2e/tonne Waste
Diesel (average biofuel
blend)
1 2,241,482  litres 5,631.3  kg CO2e/litre Fleet
Petrol (average biofuel
blend)
1 82,907  litres 181.9  kg CO2e/litre Fleet
Gas Oil 1 246,016  litres 678.7  kg CO2e/litre Fleet
Grid Electricity
(generation)
2 8,287,285  kWh 1,759.6  kg CO2e/kWh Street Lighting
Grid Electricity
(transmission
distribution losses)
3 8,287,285  kWh 155.7  kg CO2e/kWh Street Lighting
Diesel (average biofuel
blend)
1 4,525  litres 11.4 kg CO2e/mile Pool cars
Average Car -
Unknown Fuel
3 1,438,955  miles 246.8 kg CO2e/mile Staff travel
Car - Battery Electric
Vehicle (Small) miles
2 55,282 kWh 12.7 kg CO2e/kWh Electric
vehicles
Home working 3 14% workforce kWh 524.4 kg CO2e/FTE/
annum
Estimated
figure
59

Page 60

3c Generation, consumption and export of renewable energy Provide a summary of the
body's annual renewable generation (if any), and whether it is used or exported by the body. 
Renewable
Electricity
Renewable Heat 
Technology Consumed by
organisation
(kWh)
Consumed by
organisation (kWh)
Comments
Solar PV 1,175,587  62 sites with PV systems installed
Biomass  5,132,550 Installed in 48 schools and 1 sheltered
housing complex 
3d Targets 
Name of
Target
Target Scope of
Target
Baseline
Year 
Units of
baseline
Target
completion
year
Comments
Zero direct
emissions
Reduce to
zero
emissions 
Energy
use in
buildings 
2021/22  25,387  2037/38 Scope 1 gas and oil in
buildings
Zero direct
emissions
Reduce to
zero
emissions 
Transport  2021/22  6,614  2037/38 Scope 1 fossil fuels for
fleet vehicles and pool
cars
Reducing
indirect
emissions
Reduce to as
close to zero
as soon as
possible 
Energy
use in
buildings 
2021/22  10,205  2045/46 Scope 2 electricity in
buildings
Reducing
indirect
emissions
Reduce to as
close to zero
as soon as
possible 
Waste  2021/22  11,755  2045/46 Scope 3 waste collected
from households
Reducing
indirect
emissions
Reduce to as
close to zero
as soon as
possible 
Staff travel  2021/22  235  2045/46 Scope 3 staff travel in
personal vehicles
Reducing
indirect
emissions
Reduce to as
close to zero
as soon as
possible 
Street
lighting 
2021/22  1,603  2045/46 Scope 2 electricity for
street lighting
Reduce
overall
carbon
footprint 
5% reduction  Council
carbon
footprint
2019/20 67,282 2022/23 Scope 1-3 buildings,
waste, fleet, street
lighting, staff travel
60

Page 61

Percentage
of
household
waste to be
recycled
50%  Household
waste 
2021/22   2022/23 Scope 3 Household
waste
Percentage
of
household
waste at
the
council's
recycling
centres to
be recycled
64.5%  Household
waste 
2021/22   2022/23 Scope 3 Household
waste
Percentage
of
household
waste sent
to landfill
less than 10%  Household
waste 
2021/22   2022/23 Scope 3 Household
waste
Percentage
of material
accepted
by
council's
paper and
card
processor
97%  Household
waste 
2021/22   2022/23 Scope 3 Household
waste 
3da How will the body align its spending plans and use of resources to contribute to
reducing emissions and delivering its emission reduction targets?     
All Council committee reports include a section on 'Climate Change, Sustainability and
Environmental Implications' in order to ensure that these are fully assessed and taken into
consideration when making decisions.  The capital programme bid, and approval process includes
an environmental assessment which ensures all environmental impacts, both positive and negative
are considered when making decisions.  The Annual Revenue Budget process includes
information on the environmental impact of budget additions and the savings package, to ensure
that the impact, positive or negative, is considered when making decisions.   
3db How will the body publish, or otherwise make available, it's progress towards achieving
its emissions reduction targets?   
Performance on all actions relating to the Council's Sustainable Development and Climate Change
strategy are reported annually on the Council's website. This includes reporting on progress
towards emissions reduction targets.   
3e Estimated total annual carbon savings from all projects implemented by the body in the
report year 
Emissions
Source
Total estimated annual
carbon savings (tCO2e)
Comments
Electricity 46 As per project list below - LED lighting and 
PV installations 
61

Page 62

3f Detail the top 10 carbon reduction projects to be carried out by the body in the report
year Provide details of the 10 projects which are estimated to achieve the highest carbon
savings during report year.  
Project  Fundin
g
source
Are these
savings
figures
estimated or
actual?
Capital
cost (£)
Project
lifetime
(years)
Fuel/
emission
source
saved
Estimated
carbon savings
per year (tCO2e/
annum)
LED lighting Dollan Aqua
Centre
CEEF Estimated  90,750   10 Electricity  7
LED lighting Hamilton Central
library
CEEF Estimated  22,776  10 Electricity  4 
LED lighting Primary school x
9 sites
CEEF Estimated 
151,863 
10 Electricity  15 
PV panels Primary school x 2
sites
CEEF Estimated 
100,038 
10 Electricity  20       
3g Estimated decrease or increase in the body's emissions attributed to factors (not
reported elsewhere in this form) in the report year   If the emissions increased or decreased
due to any such factor in the report year, provide an estimate of the amount and direction.
2,905 tonnes increase from estate changes, due to new sites coming onto billing, sites re-opening
and re-billing again after close down due to Covid19 plus additional heating usage on a weather
corrected basis due to continuing covid ventilation controls 
3h Anticipated annual carbon savings from all projects implemented by the body in the year
ahead 
Source Saving Comments
Electricity 75 7 LED projects and 1 PV installation and battery system 
3i Estimated decrease or increase in the body's emissions attributed to factors (not
reported elsewhere in this form) in the year ahead  If the emissions are likely to increase or
decrease due to any such factor in the year ahead, provide an estimate of the amount and
direction. 
unknown 
3j Total carbon reduction project savings since the start of the year which the body uses as
a baseline for its carbon footprint   If the body has data available, estimate the total
emissions savings made from projects since the start of that year ("the baseline year"). 
599,374 tonnes This is the sum of annual carbon savings since the baseline year of 2005-06 
Fewer than 10 projects due to reporting schools LED and PV as two projects -
this is the complete set
62

Page 63

3k Supporting information and best practice. Provide any other relevant supporting
information and any examples of best practice by the body in relation to its emissions,
targets and projects. 
A Carbon Management Plan has been in place since 2008, with update reports issued in 2012,
2014, 2016 and 2018. This demonstrates our commitment to reducing our carbon footprint and
reporting in a transparent manner.  
63

Page 64

Part 4: Adaptation  
4(a) Has the body assessed current and future climate-related risks?  If yes, provide a
reference or link to any such risk assessment(s). 
Assessing Current Climate Risk
A Local Climate Impacts Profile was carried out for South Lanarkshire back in 2008.  The outcome
of the Impact Profile coupled with our knowledge of past impacts and contributory factors indicated
flooding as the biggest risk for South Lanarkshire and will be a more frequent problem in the area
which the Council and partners will respond to. 
A Council-wide climate change adaptation workshop was held in 2011 involving the most relevant
services and managers that contribute to meeting the Council’s climate change adaptation duty. 
The event was facilitated by Adaptation Scotland, and it helped raise awareness of climate change
and the potential risks and opportunities to service delivery.   
The outcome from the event was also used to help shape the Council’s sustainable development
and climate change strategy and the local development plan at the time.  The local development
plan has recently been renewed with a new LDP2 adopted in 2020.
https://www.southlanarkshire.gov.uk/info/200145/planning_and_building_standards/39/developme
nt_plans/2 
The Council’s risk management team assists in the identification and evaluation of risks associated
with the delivery of the Council's objectives and provides support to help manage these risks.  The
risk management team manage the Council's risk register and one of the top risks identified is
‘Failure to meet sustainable development and climate change objectives’.  The risk scorecard
identifies the business impacts of climate change now and in the future and contains a number of
control measures - such as ensuring that the climate change duties are embedded in policies,
plans and strategies, working with services to raise the awareness of the business risks of a
changing climate, to be an active member of the ‘Climate Ready Clyde’ partnership - to mitigate
the risk and impact of climate change.  The scorecard is reviewed annually. 
Severe weather is also one of the risks in the Council's risk register and includes control measures
such as emergency and contingency planning, weather warning alerts and response, infrastructure
investment and flood risk management.   
The Council’s Emergency Management Team (EMT) leads on responding to emergencies.  The
EMT is made up of senior managers from Services who may be involved in dealing with
emergencies and led by the Council's Resilience Adviser.  The effects of severe weather are one
of the emergencies that the EMT have prepared for.   
The South Lanarkshire area is covered by the West of Scotland Resilience Partnership which has
representatives from the emergency services, Councils, NHS boards and utilities companies.  The
West of Scotland Community Risk Register (CRR) includes severe weather incidents, the possible
consequences and what the Regional Resilience Partnership are doing to mitigate the risks.   
The CRR is the result of risk assessments carried out by the multi-agency resilience partnership to
identify the likely risks in the area and rate them in terms of their potential impact and likelihood of
occurring. The results of these assessments are used to inform the partnership and produce
agreed and effective multi-agency plans and procedures 
Assessing Future Climate Risks
The Council has a dedicated flood risk management team who manages flooding priorities and
delivers prioritised flood protection schemes.  In accordance with the requirements of the Flood
Risk Management (Scotland) Act 2009, the flood risk management team has been involved in the
publication of the Clyde and Loch Lomond and Tweed Local Flood Risk Management Plans. The
production of these plans has involved a national flood risk assessment and identification of
potentially vulnerable areas.  Flood risk assessments and the implementation of sustainable
64

Page 65

drainage systems are required as part of the planning process for any new builds/developments. 
These future flood risks are also incorporated into the local development plan 2. 
The impacts from increased rainfall are the area’s biggest climate change risks however the
challenges from rising temperatures and sea levels will also bring risks as well as opportunities for
the area.  To understand these risks further, and what action is required to mitigate them, the
Council is an active member of the Climate Ready Clyde partnership – a collaborative initiative that
has developed an adaptation strategy and action plan for the Glasgow City Region (which includes
all of South Lanarkshire both rural and urban areas).      
http://climatereadyclyde.org.uk/ 
The partnership started in 2017 the first major piece of work was to assess the risks and
opportunities of climate change for the city region.  The risk and opportunities assessment were
launched in October 2018 and sets out the risks and opportunities posed by climate change to the
end of this century, and highlights areas where more action is needed in the next five years. The
risks and opportunities assessment is supported by a technical report and in parallel an economic
assessment was undertaken which provides an evidenced baseline cost of doing nothing 
The assessment identified 70 risks and opportunities which can be found on the website and have
been grouped into four categories of urgency: - more action needed, build capacity and
understanding, sustain current action, and a watching brief.  The findings and recommendations in
the assessment were used to guide the development of the first Adaptation Strategy and Action
Plan for the Glasgow City Region which was launched in June 2021. 
Climate Ready Clyde has also developed and piloted a toolkit for screening capital investment and
major projects. Informed by world leading thinking from development banks, the toolkit will enable
a common approach to embedding adaptation into new investment to maximise its performance. 
South Lanarkshire Council hosted training on the toolkit for both Climate Ready Clyde partners,
and officers of the Council, for use on large scale investment projects. 
4(b) What arrangements does the body have in place to manage climate-related risks?  
Provide details of any climate change adaptation strategies, action plans and risk
management procedures, and any climate change adaptation policies which apply across
the body 
The Council's sustainable development and climate change strategy 2017-2022 includes the
Council's approach to managing climate change adaptation.  Within the strategy’s Sustainable
Council theme, the intention is to take account of the public sector climate change duties
(reduction, adaptation and acting sustainably) when making decisions about the use of our assets
and capital investment in our estate.  Incorporating climate screening as part of the capital
programme submission process would help to manage this.  Within the Sustainable Communities
theme the intention is to work in partnership to ensure local infrastructure, buildings and local
communities are resilient to adapt to the impacts of climate change.  The strategy links with the
work of Climate Ready Clyde. 
The Climate Ready Clyde board, subgroups and networks provide a forum for the Council to
engage with other stakeholders to understand the collective risks from the City Region. Doing so
will also enable dialogue between the Council and others about the wider consequences of one
organisation’s climate risks on other organisations (for example, disruptions to transport network
affecting the ability for employees to get to work). 
The Council has a Risk Management Strategy which aims to provide a sensible and
proportionate approach to risk management that promotes awareness rather than avoidance. 
Resources are required to ensure that risk management is embedded in service planning and
delivery; in the way they make decisions; in major projects; and in their dealings with partners and
contractors.   
65

Page 66

The Council has a corporate 'Business Continuity Plan' which is managed by the Resilience
Adviser.  South Lanarkshire Council is a category 1 responder and leads the Local Resilience
Partnership on work required to meet the Civil Contingencies Act 2004 and its associated Scottish
Regulations and Guidance as part of Scotland Regional Resilience Partnership. 
In addition, the Council has the following strategies and plans which include policies and actions to
address climate-related risks: - 
Core Path Plan – Adopt a path is an environmental volunteering opportunity in South Lanarkshire
to report the condition of paths within the Council’s path network.  An interactive comprehensive
map of all core path routes in South Lanarkshire can be found on the Council’s web-site. 
Local Development Plan 2015 - 2020 - Supplementary Guidance to the Local Development Plan,
such as Sustainable Development and Climate Change, Green Network and Greenspace, Natural
and Historic Environment.  A key theme running through the Local Development Plan is the need
to address the land use issues arising from the impact of climate change.
• Policy 2, Climate Change – proposals for new development must, where possible, seek to
minimise and mitigate against the effects of climate change.
• Policy 14, Green network and Greenspace - any development proposals should safeguard
the local green network and identify opportunities for enhancement and / or extension
which can contribute towards: - place-making; mitigating greenhouse gases; supporting
biodiversity; enhancing health and quality of life; providing water management including
flood storage, and buffer strips; providing areas for leisure activity; and promoting active
travel.
• Policy 17, Water environment and flooding - the avoidance principle of flood risk
management as set out in Scottish Planning Policy must be met. 
Local Development Plan 2 (2020-2025) - A key theme running through the Local Development
Plan 2 is the need to address the land use issues arising from the impact of climate change.
• Policy 2, Climate Change – proposals for new development must, where possible, seek to
minimise and mitigate against the effects of climate change.
• Policy 13, Green network and Greenspace - Development proposals should safeguard the
green network, as identified on the proposals map, and identify opportunities for
enhancement and/or extension which can contribute towards mitigating greenhouse gases
and adapting to the impacts of climate change
• Policy 16, Water environment and flooding - the avoidance principle of flood risk
management as set out in Scottish Planning Policy must be met. 
Response to Flooding - The Flood Risk Management Service have procedures to deal with
potential flooding events, called 'Response to Flooding', which is reviewed annually and takes
cognisance of the effects of climate change upon predicted flood risk. Flood risk assessments and
the implementation of sustainable drainage systems are required as part of the planning process
for any new builds or developments. 
Local Transport Strategy 2013-2023 - Objective 6: Mitigate, adapt and manage the effects of
climate change, including flooding, on transport infrastructure and communities. 
The revised South Lanarkshire Biodiversity Strategy 2018-2022 has been approved and
published.  Climate change is identified as a key cross-cutting theme in the draft South Lanarkshire
Biodiversity Strategy that affects all ecosystems. Issues related to this are identified and addressed
where possible. Peatland management which benefits carbon sequestration remains a key theme 
The Biodiversity Duty Implementation Plan (BDIP) will encourage appropriate management of
the Council estate.  The BDIP will, through the planning function, encourage other land-owners and
developers to adopt the principles of the Biodiversity Strategy in their land-use. This is especially
important in woodland cover and peatland conservation for carbon management and intrinsic
biodiversity. 
66

Page 67

The Council has an ‘Energy Framework Group’ which has representation from Housing and
Technical Resources and Community and Enterprise Resources. The group discusses the delivery
of actions which includes energy efficiency measures, carbon reduction and climate change
adaptation. 
The Council's 'Environmental Statement' is for all employees and sets out the environmental
commitments and how employees can contribute to the commitments.  Meeting our climate change
duties is one of the high-level commitments which includes preparing for a future where the climate
is changing. 
4(c) What action has the body taken to adapt to climate change?  Include details of work to
increase awareness of the need to adapt to climate change and build the capacity of staff
and stakeholders to assess risk and implement action.   
Delivering adaptation actions
• Ongoing peatland conservation at Langlands Moss to help ensure the long-term viability of
the site as a peat bog that can contribute to biodiversity, flood management and carbon
storage           
• The Council has adopted and implemented a number of practices to adapt to climate
change through both building design and management: - Natural Ventilation, SUDS,
Insulation, low carbon technologies (Air Source Heat Pumps, Ground Source Heat Pumps,
PV, LED, Combined Heat and Power systems, Biomass).
• The Council’s Flood Risk Management team continue to be consulted regularly during the
Planning and Development Management process to ensure all new developments are
being designed in accordance with the latest guidance on flood risk, climate change and
the sustainable management of surface water.
• Contributing to the flagship actions in Climate Ready Clyde’s climate adaptation strategy
and action plan.   
Building adaptive capacity
• Flagship action 1 in the adaptation strategy is ‘Local authorities in the region working
together to build capabilities and deliver collaborative adaptation’.  A local authorities
working group is being established to take forward this action.
• Raising the awareness of the Risk and Opportunity Assessment and the Climate
Adaptation Strategy 
• The Council has starting using Adaptation Scotland’s Benchmarking Tool.  The tool
provides a baseline assessment of the Council’s current adaptation capabilities and how we
can development progresses over time. The Council’s Sustainable Development Officer
also attends the Capability Benchmarking Assessment Network meetings to share
experience and knowledge amongst peers.
• The Council is also part of the Transboundary Adaptation Learning Exchange’ (TalX) which
is a collaborative project working across Northern Ireland, Republic of Ireland, Scotland,
England and Wales and is an EPA–funded research project.  TalX aims to establish an
innovative learning network to enable a cohesive approach for measuring and acting
on climate change adaptation across boundaries. 
• As members of Climate Ready Clyde, the Council has been involved in training in
adaptation skills and competencies including the business case for action and the co-
benefits; training on Climate justice and the new projections of future flood disadvantage;
and have access to an advisory board which is a virtual group of practitioners cities and
adaptation experts to inform and challenge the City Region’s approach to adaptation. 
4(d) Where applicable, what contribution has the body made to helping deliver the
Programme? 
Local Flood Risk Management Plans were published in June 2016. South Lanarkshire Council
(SLC) was involved in the production of the Clyde and Loch Lomond and Tweed LFRMPs.
Through the process of developing these plans a National Flood Risk Assessment identified the
67

Page 68

areas at risk of coastal flooding, and then objectives and actions were included in the Plans for
Responsible Authorities to undertake in order to improve the current situation. 
South Lanarkshire Council have been involved in the production and the ongoing updating of the
Scottish Detailed River Network (SDRN), and in complying with our duty under the Flood Risk
Management (FRM) Act we use this dataset within our asset management database to assess and
maintain waterbodies. We also have access to the LiDAR (Light Detection and Ranging) dataset
which is regularly utilised during the catchment analysis stage in the production of Flood Studies. 
SLC’s Local Development Plan 2 contains policies on protecting and enhancing its priority
greenspace and green networks and ensuring the effect of development proposals on the natural
environment and flood risk is considered during the application process.  The plan also contains
policy to ensure development proposals mitigate and adapt against climate change. The Planning
Service works closely with colleagues in Greenspace and Countryside to ensure habitats are not
adversely affected by new development. Masterplanning of the Council’s Community Growth Areas
has incorporated measures to enhance existing habitats. 
The Council manages two components of the Clyde Valley Woodlands National Nature Reserve, at
Chatelherault and Mauldslie. Recent restructuring of the woodland at both sites is allowing
conversion from coniferous forest to naturally regenerating, native broadleaved woodland. 
SNH published a survey of the River Clyde Catchment to establish the extent of riparian
transported Invasive Non-Native Species (INNS) plants, Japanese Knotweed, Giant Hogweed and
Himalayan Balsam. SLC collect data on reported occurrence, principally Japanese Knotweed and
undertake some control of the species on SLC land. 
Energy Efficient Scotland: Area Based Scheme (EES:ABS) programmes were developed to install
external wall insulation in privately owned and council properties and are prioritised to target fuel
poor areas and households in most need of assistance. There are significant changes to the way in
which these programmes can now be delivered, with the introduction of PAS2035, market supply
of materials and significant increase in costs. In the financial year 2021-22 61 private properties
and 81 council properties had external wall insulation applied. 
Programmes of works for energy efficiency measures – loft and cavity insulation, external wall
insulation and heating upgrades – have been developed to increase energy efficiency in tenant’s
homes. 98% of SLC housing stock complied with EESSH as of March 2022. 6.48% of SLC housing
stock complied with EESSH2 as of March 2022. 
The Council facilitates the council LA Flex Scheme. Energy Company Obligation (ECO)
programme is funded from the large energy suppliers who provide funding for the installation of
energy efficiency measures to owner occupied homes across the UK in order to reduce the
country’s carbon emissions.  Each LA is responsible to complete and submit their annual return to
BEIS (Business Energy & Industrial Strategy) Last financial year under ECO 3 1,560 homeowners
have 3,536 energy efficiency measures installed for example first time central heating, replace of
gas boilers and new heating controls, loft and cavity wall insulation, unfloor insulation and internal
wall insulation. 
4(e) What arrangements does the body have in place to review current and future climate
risks?    Provide details of arrangements to review current and future climate risks, for
example, what timescales are in place to review the climate change risk assessments
referred to in Question 4(a) and adaptation strategies, action plans, procedures and policies
in Question 4(b).
SCCAP2 and the Risk and Opportunity Assessment for the city region will provide a basis for
climate adaptation in the development of the Council's next sustainable development and climate
change strategy 2022-2027.  The strategy will review current and future climate risks and an action
plan will be prepared with improvement actions as required. 
The Council's top risks, which include risks on both climate change and adverse weather, are
reviewed annually in June.  
68

Page 69

The local development plan (LDP) was renewed in 2020.  Climate change mitigation and
adaptation are key themes throughout the LDP2. 
The new Biodiversity Strategy 2018-22 and Biodiversity Duty Implementation Plan were launched
in 2018. The Strategy is reviewed every five years and the BDIP every three years. Action planning
takes places on a rolling programme and kept under continual review. The South Lanarkshire
Biodiversity Partnership meets once a year, but the project development is largely driven by
subgroups that meet more regularly. 
The Strategic Environmental Assessment process is well embedded within the Council and
provides an opportunity to assess the risks and opportunities of climate change in new or revised
plans, policies and strategies.  The next sustainable development and climate change strategy will
undergo a full SEA.  The climate adaptation strategy for the city region is also undergoing a full
SEA. 
The first cycle of Local Flood Risk Management Plans (LFRMP), which were published in 2016 will
be updated in 2022.  The monitoring of weather patterns, including rainfall statistics, continues to
be carried out to help inform how the Council allocates resources and tracks the observed effects
of climate change. 
The actions for the Council in the current cycle of LFRMPs includes the production of four Flood
Protection Studies and 5 Surface Water Management Plans. The Council are currently working
through a programme of delivering these projects and the effects of climate change upon future
flood levels, and the resultant impacts upon building and infrastructure networks etc., will be
considered in each of these projects. 
Climate Ready Clyde launched the first comprehensive risk and opportunity assessment for the
Glasgow City Region, in October 2018.  The findings and recommendations in the assessment
were used in the development of the first Adaptation Strategy and Action Plan for the
Glasgow City Region.  The risk and opportunity assessment provides context for the Council’s
risk management approaches to climate change adaptation. 
Biannual State of the Environment report has indicators for monitoring climate change. This is
reported to various governance forums within the Council and with partners.
4(f) What arrangements does the body have in place to monitor and evaluate the impact of
the adaptation actions?  Please provide details of monitoring and evaluation criteria and
adaptation indicators used to assess the effectiveness of actions detailed under Question
4c and Question 4d.
South Lanarkshire's State of the Environment Report provides data that facilitates the monitoring
and evaluation of a range of environmental issues - such as Biodiversity, Soil, and Water - where
climate change adaptation action has been undertaken. This includes a specific chapter related to
climate change.
https://www.southlanarkshire.gov.uk/downloads/file/13578/south_lanarkshire_state_of_the_environ
ment_report_2019   
The Council's performance management system IMPROVe is used to monitor and report actions
and measures within Resource Plans and the Sustainable Development and Climate Change
Strategy (SDCCS).  The SDCCS includes adaptation actions such as biodiversity, greenspace and
flood risk management which are monitored and evaluated through IMPROVe. 
SEPA prepared indicators that have been used in the first cycle of the LFRMPs, however these will
be reviewed and adapted to ensure they are reflective of the on-going changes within the cycles
and as our understanding improves through the process.  A number of Surface Water
Management Plans (SWMP) and Flood Studies have been developed for the locations assessed
with the highest Annual Average Damages (AADs) from surface water and river flooding. Any
actions or recommendations identified within the plans and studies will be evaluated in regard to
reduce or mitigation of damages due to flooding within these areas. 
69

Page 70

The regional adaptation strategy and action plan, through Climate Ready Clyde, will be monitored
and evaluated. 
4(g) What are the body’s top 5 priorities for the year ahead in relation to climate change
adaptation?  Provide a summary of the areas and activities of focus for the year ahead. 
1. Continue to raise awareness of the risks and opportunities for the city region with elected
members and officers of the Council and how these could impact service delivery and local
communities
2. Continue Climate Ready Clyde development work for the flagship actions in the city
region’s adaptation strategy and action plan
3. Continue involvement in the TalX project.
4. Work with the equalities team to further understand the effects of climate change on
vulnerable groups and how Climate Justice can be incorporated in equality impact
assessments
5. Continue progressing the Adaptation Scotland’s benchmarking toolkit 
4(h) Supporting information and best practice Provide any other relevant supporting
information and any examples of best practice by the body in relation to adaptation. 
South Lanarkshire Council is a member of the Climate Ready Clyde partnership. Climate Ready
Clyde is a place-based approach to adapting to the impacts of climate change.  Initially, a three-
year initiative to assess the risks and opportunities and develop a comprehensive adaptation
strategy and action plan for Glasgow City Region. 
Glasgow City Region now has its first Climate Change Risk and Opportunity Assessment which
sets out the risks and opportunities posed by climate change to the end of this century, and
highlights areas where more action is needed in the next five years. The assessment is supported
by a technical report and an economic study of the costs and benefits of Glasgow City Region’s
climate risks and opportunities.  The full assessment, methodology, technical report and economic
study are available on the Climate Ready Clyde website. 
The findings and recommendations in the assessment were used to guide the development of the
first Adaptation Strategy and Action Plan for the Glasgow City Region.  A Theory of Change was
developed and the strategy and action plan – along with the SEA – was published in June 2021. 
The Strategy aims to ensure Glasgow City Region’s economy, society and environment is not only
prepared for, but continues to flourish in the face of the impacts arising from the climate crisis. The
Strategy:
• outlines the processes and early interventions needed to manage climate risks and realise
opportunities in line with our Theory of Change
• provides a strategic framework for adaptation in and by the Glasgow City Region that fits
alongside and supports key plans, policies and activities to enable delivery
• sets out how Glasgow City Region will deepen and expand collaboration and collective
impact by working together and engaging, equipping and enabling citizens and
organisations to play a role in realising the vision
• sets out how progress in increasing climate resilience will be monitored, evaluated and
learnt from to improve policies, strategies, programmes and projects.
The Strategy is supported by the Action Plan which contains the concrete actions being taken in
the City Region between 2020 and 2025 that will move the City Region towards its vision. 
70

Page 71

Part 5: Procurement 
5(a) How have procurement policies contributed to compliance with climate change duties?  
Provide information relating to how the procurement policies of the body have contributed
to its compliance with climate changes duties. 
The Council continues to consider environmental and social issues when purchasing goods and
services.  From June 2016, South Lanarkshire Council was subject to a new Sustainable
Procurement Duty, whereby the Council must demonstrate that it has considered sustainability in
all of its regulated purchases over £50,000. Consequently, whenever anyone makes a purchase
above £50,000 on behalf of the Council they need to consider how the purchase can: 
• Improve the economic, social and environmental wellbeing of the authority area, with a
particular focus on reducing inequality
• Facilitate the involvement of small and medium enterprises, third sector bodies and
supported businesses
• Promote innovation 
One of the key objectives in the Council’s Procurement Strategy is “Sustainable and Ethical” in
recognition of our responsibility to secure wider social, economic and environmental benefits
through contracts as set out in the Sustainable Procurement Duty. 
The Council uses the Sustainable Flexible Framework to measure organisational progress in
embedding sustainable outcomes: the framework measures performance across the following
areas: 
• People: training on sustainable procurement tools is progressing across the organisation
• Objective, Strategy and Communications: sustainable procurement duty embedded in
Procurement Strategy
• Process: Development of the prioritisation and sustainable tools is scheduled for 2021/2022 
• Stakeholders: improved engagement for stakeholders 
• Monitoring and Reporting: Sustainable procurement outcomes are included in the Annual
Report 
5(b) How has procurement activity contributed to compliance with climate change duties?  
Provide information relating to how procurement activity by the body has contributed to its
compliance with climate changes duties. 
In 2021/2022, the Council completed the Scottish Government’s Prioritisation Framework with the
support of Sustainable Development Scotland: this identifies the key categories of spend where the
Council can influence and improve sustainability, including climate impacts. The Procurement
Service is also reviewing the scoring approach to tenders to improve the consideration of climate
and this is expected to be implemented in 2022/2023. 
5(c) Supporting information and best practice
The output from the Sustainable Procurement tools can be accessed through the Council’s Annual
Procurement Report 2021/2022. 
71

Page 72

Part 6: Validation and declaration
6(a) Internal validation process   Briefly describe the body’s internal validation process, if
any, of the data or information contained within this report. 
This report has been reviewed by the Corporate Management Team and Climate Change and
Sustainability Committee prior to submission.   
Finance and Corporate Resources have previously carried out an internal audit of the climate
change duties report. The audit interrogated the data compilation and evidence pack and reported
that the methodologies and processes were robust and sound. The 2021-22 report has not been
audited however the same methodologies and processes have been applied as previous years. 
6(b) Peer validation process Briefly describe the body’s peer validation process, if any, of
the data or information contained within this report. 
When the internal audit was carried out a benchmarking exercise comparing the level of reporting
detail against six other local authorities that come under the same ‘family group’ as South
Lanarkshire for sustainability (LGBF) was reviewed. Overall South Lanarkshire’s report compared
favourably with the other Councils reviewed. 
6(c) External validation process   Briefly describe the body’s external validation process, if
any, of the data or information contained within this report. 
Portions of the data and information used are reported and have been audited externally, for
example energy use within building and street lighting for CRC purposes, and waste figures by
SEPA. 
6e - Declaration
I confirm that the information in this report is accurate and provides a fair representation of the
body’s performance in relation to climate change. 
Name Role in the body Date
David Booth Executive Director of Community
and Enterprise Resources 
November 2022 
72

Page 73

Report
Agenda Item 
Report to: Climate Change and Sustainability Committee 
Date of Meeting: 9 November 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject: Clyde Climate Forest Concordat 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 note the Glasgow City Region (GCR) cabinet report on the first-year progress of
the Clyde Climate Forest (CCF) initiative
 note the development of the CCF/GCR concordat
 seek approval to endorse the concordat 
[1purpose]
2. Recommendation(s)
2.1. The Committee is asked to approve the following recommendation(s):-
[recs]
(1) note and welcome the first-year report on progress of the Clyde Climate Forest
initiative and the development of the CCF/GCR Concordat;
(2) approve the Concordat and agree to its signing by the GCR cabinet 
(3) note the establishment of a corporate Working Group to progress the Council’s
commitments in relation to the Clyde Climate Forest
[1recs]
3. Background
3.1. The Clyde Climate Forest was launched by GCR Cabinet in June 2021 with a headline
target of “18 million trees over the next decade”. The aim of the CCF is to enable and
co-ordinate an approach that will deliver a major increase in tree planting across GCR
by 2032 as a response to the Climate Emergency. 
3.2. The Glasgow GCR cabinet report dated 30 August 2022 (Appendix 1) provides the
first-year progress of the CCF initiative.  At this meeting, the cabinet also endorsed the
Clyde Climate Forest Concordat and requested that this is approved by individual local
authorities. 
4.  CCF/GCR Concordat 
4.1.  South Lanarkshire is an important stakeholder in the Clyde Climate Forest, with the
Council convening the Canopy Working Group and representing that group on the
CCF Steering Group. The Council is also a significant landowner and a vital partner in
supporting the initiative to deliver its objectives. 
4.2. Over the course of its first year, those actively involved in the Clyde Climate Forest
have learned that there are great opportunities that could be pursued arising from the
initiative. However, there are some barriers to realising the opportunities. To allow
6
73

Page 74

GCR Councils to fully play their role in the initiative there is a need to clarify the role
of the Clyde Climate Forest team (and its Delivery Partners) and the role of the
councils – particularly in relation to the urban canopy aims of the initiative. The
CCF/GCR Concordat (Appendix 2) seeks to provide that clarity with clear
commitments, roles and responsibilities in pursuit of the CCF objectives. 
4.3. South Lanarkshire Council has begun setting out real, lasting commitments to the
management, protection and enhancement of trees at a canopy cover level along
social-ecological principle. This approach maximises the services and quality of life
benefits it can collectively bring to its community. The commitment to the CCF
objectives and partnership working aligns with the councils’ own objectives and
aspirations.   
5.  Council Commitment 
5.1. The Council is a key stakeholder in tree canopy cover as it has responsibility for
planning and development, environmental legislation, Roads, Education, Housing, as
well as being major landowners. The Council manages, protects and enhances those
trees growing on the Council’s estate, or those it can influence through the planning
framework, Roads or collective working, a small but significant part of our canopy
cover. 
5.2. If approved, it is hoped that the Concordat will be signed by the GCR Cabinet on or
around National Tree Week (27 November – 5 December 2022). 
5.3. To progress the Council’s commitment in relation to the Clyde Climate Forest, a
working group will be established with key service areas involved in making or
influencing decisions that affect trees or in shaping the spaces and places in which we
live, work and relax.  
6. Employee Implications
6.1. The Council has committed staff time to convene the Canopy Working Group and
represent that group on the CCF Steering Group. An internal working group will also
be established to progress the Council’s commitments in relation to the CCF. 
7.  Financial Implications
7.1. There are no financial implications at this point, however, as this work progresses,
additional funding may be required to deliver on commitments. This will be subject to
future reports and officers will explore all opportunities for external funding to support
this work. 
8. Climate Change, Sustainability and Environmental Implications
8.1. The Concordat and the Council’s commitment to the Clyde Climate Forest will support
the delivery of the Council’s Climate Change ambitions and broader strategy,
particularly in the areas of biodiversity, carbon capture and adaptation. 
9. Other Implications
9.1. There are no implications for risk in terms of the information contained within this report 
10. Equality Impact Assessment and Consultation Arrangements
10.1. This report does not introduce a new policy, function or strategy or recommend a
change to an existing policy, function or strategy and, therefore, no impact assessment
is required.  
74

Page 75

David Booth
Executive Director 
19 October 2022 
Link(s) to Council Values/Priorities/Outcomes 
 Improve the quality of life of everyone in South Lanarkshire
 Make communities safer, stronger and sustainable
 Improve health, care and wellbeing
 Work with communities and partners to promote high quality thriving and sustainable
communities 
Previous References
 None 
List of Background Papers
 None 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact:-
Name: Andy Whalley
Designation:  Arboriculture Officer
Contact Number: 07795 090 304
Email: andy.whalley@southlanarkshire.gov.uk 
75

Page 76

76

Page 77

Glasgow City Region Cabinet 
Report by Councillor Gordan Low, Leader of East Dunbartonshire
Council and Land Use and Sustainability Portfolio Lead 
Contact:  Max Hislop
T: 07796 937972  E: max.hislop@tcv.org.uk 
Clyde Climate Forest: First Year Progress Report and Concordat 
Purpose of Report: 
The purpose of the paper is to provide a report on the progress of the Clyde Climate Forest
(CCF) initiative since its launch and to propose that a Clyde Climate Forest Glasgow City
Region Concordat is endorsed by Cabinet. 
Recommendations 
The Cabinet is invited to: 
a) Note and welcome the first-year report on progress of the Clyde Climate Forest
initiative and the development of the CCF/GCR Concordat; 
b) note that Clyde Climate Forest will seek approval of the Concordat from the
individual local authorities in order to maintain local democratic oversight; and 
c) endorse the Clyde Climate Forest Glasgow City Council Concordat. 
Item 6
30th August 2022
6
77

Page 78

1. Purpose 
1.1 The purpose of the paper is to provide a report on the progress of the Clyde Climate
Forest (CCF) initiative since its launch and to propose that a Clyde Climate Forest
Glasgow City Region Concordat is endorsed by Cabinet. 
2. Background 
2.1 The Clyde Climate Forest was launched by GCR Cabinet in June 2021 with a headline
target of “18 million trees over the next decade”. The aim of the Clyde Climate Forest
is to enable and co-ordinate an approach that will deliver a major increase in tree
planting across GCR by 2032 as a response to the Climate Emergency. 
2.2 Trees, woodlands, and forests provide a range of nature-based solutions to the twin
and linked challenges of a changing climate and ecological collapse:
• Urban trees – provide urban cooling in heatwaves, and surface water management
for cloudbursts, whilst also providing some carbon storage and wildlife habitat;
• Native woodlands – provide essential ecosystem services and habitat for
associated species and, when part of a wider network, allow those species to
migrate as the climate changes;
• Plantation forests – are effective carbon sinks, can provide upstream natural flood
management, provide construction timber to substitute for high emission steel and
concrete and provide wildlife habitats. 
2.3 Specific objectives for the Clyde Climate Forest are based on three ‘C’s: 
• Canopy: to increase average urban tree canopy cover to 20%;
• Connectivity: to increase the average woodland habitat network area by 20%;
• Carbon: to increase forest and woodland land cover in the Region to 20%. 
2.4 This means that over the next decade the Clyde Climate Forest will facilitate and co-
ordinate: 
• tree planting in urban neighbourhoods where there are few trees, and which are
susceptible to the impacts of a changing climate;
• new native woodlands in target locations which join up existing woodland habitats;
and,
• a doubling of the current rate of forest and woodland planting in the Region. 
2.5 The Woodland Trust granted £400k and Scottish Forestry granted £150k to Clyde
Climate Forest over the first two years which provides a ‘kick-start’ for the project.  A
Programme Board provides oversight for the project which is co-chaired by the Chief
Executives of East Dunbartonshire and East Renfrewshire Councils, representing the
GCR Partnership’s interests in the project. The Programme Board other members
comprise senior representatives from Scottish Forestry, Woodland Trust, TCV,
Scottish Water and Strathclyde University. 
2.6 A Steering Group provides direction and co-ordination for the project’s programme of
work and is chaired by Scottish Forestry. The Steering Group comprises operational
representatives from those organisations that have a role in delivering the Clyde
Climate Forest’s objectives, and the Partnership Manager for the GCR Partnership. 
78

Page 79

3. Progress since June 2021 
CCF Staff Team
3.1 A Director and two Engagement Officers were recruited in June 2021. In January 2022
both Engagement Officers moved on to other jobs and a restructuring of the team was
agreed with funders. Recruitment for the new positions has been difficult but an
Operations Coordinator and a Development Manager are now in-post employed by
TCV and the Green Action Trust. In addition, Trees for Cities is funding and recruited
an additional ‘Urban Tree Canopy Coordinator’ post which brings additional capacity
to the team. 
Canopy – Urban Tree Planting
3.2 In the 2021/22 tree planting season the CCF team worked with council officers to
facilitate urban tree plantings. Statistics for these projects are still being collated but it
is estimated that more than 60,000 trees have been planted across the Region
because of these activities. 
3.3 Sixteen “Target Neighbourhoods” have been identified across urban areas of GCR.
These will be the focus for urban tree planting activities for the CCF team over the
coming years. Target Neighbourhoods are characterised by having low levels of urban
trees and high vulnerability to the impacts of climate change. The CCF team are
working with council officers and CCF Delivery Partners to deliver tree planting projects
in some of the Target Neighbourhoods in the 2022/23 season. These projects will
receive funding from the Woodland Trust grant and sponsorship from local businesses. 
Connectivity – Targeted Woodland Planting
3.4 Over 200 areas have been identified across GCR where broadleaved woodland
planting will make a significant contribution toward connecting the Region’s existing
woodland habitat networks and create a migratory corridor for wildlife. Based on CCF’s
innovative analysis, Scottish Forestry has created a new ‘Target Area Payment’ which
is additional funding to the Forestry Grant Scheme payment to landowners that create
broadleaved woodlands in the CCF connectivity target areas. This will be an important
incentive to landowners to plant “the right trees in the right places”.   
3.5 The CCF team have had several discussions with landowners in target areas and
currently one project is in development in North Lanarkshire. 
Carbon – Doubling Forest Creation
3.6 There is a significant growth of interest and activity in tree planting in GCR largely
driven by investors, businesses and other organisations looking to acquire woodland
derived carbon credits to offset their own emissions or to sell in a burgeoning carbon
market. Scottish Forestry report that some major schemes of forest and woodland
creation in GCR are in the Forestry Grant Scheme approval ‘pipeline’. Statistics on this
activity are reported annually in June by Scottish Forestry and will be made available
at the meeting. 
3.7 The CCF Team looks to amplify the woodland creation promotional activity that
Scottish Forestry and the wider forestry sector undertake in GCR. The high profile of
the Clyde Climate Forest is seen as being beneficial to attracting new landowners
toward the benefits of tree planting on their land. Discussions are ongoing with several
landowners in this regard. 
79

Page 80

4. A CCF/GCR Concordat 
4.1 Glasgow City Region is an important stakeholder in the Clyde Climate Forest. The
Council Leaders have shown enthusiastic support for the initiative. The Councils are
also significant landowners and vital partners in helping the initiative to deliver its
objectives. 
4.2 Over the course of its first year those actively involved in the Clyde Climate Forest
have learned that there are great opportunities that could be pursued arising from the
initiative.  However, there are some barriers to realising the opportunities. To allow
GCR Councils to fully play their role in the initiative there is a need to clarify the role of
the Clyde Climate Forest team (and its Delivery Partners) and the role of the councils
– particularly in relation to the urban canopy aims of the initiative. The CCF/GCR
Concordat seeks to provide that clarification by stating what the CCF team and
Delivery Partners will seek to provide and what the Councils will seek to provide in
pursuit of the CCF objectives. 
4.3 The draft Concordat (Appendix) is framed on four sections: 
i. An acknowledgement of the significant challenge that the climate and ecological
emergencies present to GCR; the need for additional and sustained effort across
the region as a response to the challenge; and the role of trees, woodlands, and
forests in this endeavour.
ii. A recognition of the concept and targets of the CCF; the wider social, economic,
and environmental benefits their delivery will provide; and Scottish Government
support for the CCF.
iii. A commitment from CCF team and Delivery Partners to seek additional
resources toward the delivery of targets; promote Council activities and interests
toward trees; and an alignment of CCF and GCR communications.
iv. A commitment from GCR Councils to actively participate in the realisation of
CCF targets and support the work of the CCF team; ensure the CCF is embedded
in plans and policies; manage, protect, and enhance Council trees; identify
opportunities for tree planting on Council owned land; work with the CCF team to
increase urban tree canopy cover in target neighbourhoods; promote and celebrate
trees so that they are cherished and protected. 
4.4 The draft Concordat has been shared with many relevant council officers with
favourable feedback. It is hoped that a high-level recognition of the role of the Councils
working in partnership with the CCF team and Delivery Partners will facilitate an uplift
in the delivery of “the right trees in the right places” on Council managed land across
the Region. 
5. Recommendations 
5.1 The Cabinet is invited to: 
a. Note and welcome the first-year report on progress of the Clyde Climate Forest
initiative and the development of the CCF/GCR Concordat; 
b. note that Clyde Climate Forest will seek approval of the Concordat from the
individual local authorities in order to maintain local democratic oversight; and 
c. endorse the Clyde Climate Forest Glasgow City Council Concordat. 
80

Page 81

The
Clyde
Climate
Forest
Glasgow City Region Concordat
6
81

Page 82

Actively participate in, and promote, the realisation of
CCF targets within each council area;
Support the work of the CCF team and the CCF
Delivery Partners as part of the Council’s commitment
to partnership working;
Ensure the CCF is integrated and trees are embedded,
as appropriate, into development plans, development
frameworks, masterplans, design briefs along with
corporate policy and investment documents;
Manage, protect and enhance the council’s tree
resource through robust tree canopy cover strategies
and appropriate policies and practices;
Identify council owned land holdings appropriate for
woodland creation as part of the council’s plans to
achieve ‘Net Zero’;
Work with the CCF team to identify ‘target
neighbourhoods’ to increase urban canopy cover, and
to identify potential tree planting sites, target available
resources and facilitate delivery;
Actively participate in the CCF ‘Canopy Working
Group’ and other CCF working groups as they arise;
Actively promote a cultural change in relation to
tree provision and management and overcome
perceived barriers to the planting and the retaining of
appropriate trees;
Actively work toward achieving the globally recognised
status as a ‘Tree City of the World’ for each council.
GCR Councils commit 
from this date to:The government’s support for the Clyde Climate Forest
(CCF) through its inclusion in Scotland’s National
Planning Framework;
The CCF concept and targets as described in the CCF
brochure
The opportunity the creation of the CCF provides to
deliver our economic, social and environmental aims;
The opportunity to develop and enhance our
partnerships with other Local Authorities, National
Agencies, NGOs and communities in delivering 
CCF ambitions.
GCR welcome:
Date
Work to achieve CCF targets within each Council
area and to seek additional resources and funding to
facilitate their delivery;
Promote the interests and activities of each Council
toward trees and their management, protection and
enhancement wherever possible within the architecture
of the CCF;
Ensure that CCF communications work is compatible
with, and supportive of GCR communications.
The Clyde Climate Forest*
commit from this date to:
*The Clyde Climate Forest here refers to the CCF staff
team and the CCF Delivery Partners (namely: Scottish
Forestry; Woodland Trust Scotland; TCV Scotland; Green
Action Trust; Trees for Cities and Glasgow City Region).
The Clyde Climate Forest will see 18 million
trees planted across the region over the
next decade as a response to the Climate
and Ecological Emergencies. Glasgow City
Region’s (GCR) local authorities are important
stakeholders in its delivery.
Objectives –
• Urban trees – 1.5 million trees to increase tree 
canopy cover in urban areas vulnerable to 
climate impacts
• Woodland habitats – new woods in over 200 
locations to connect our habitats and create   
migration routes for wildlife
• New forests – doubling the current rate of   
woodland creation to lock up carbon and create 
new jobs and a renewable resource for the region.
Councillor Gordan Low, Leader, 
East Dunbartonshire Council
Councillor Owen O’Donnell, Leader, 
East Renfrewshire Council
Councillor Iain Nicolson, Leader, 
Renfrewshire Council
Councillor Jim Logue, Leader, 
North Lanarkshire Council
Councillor Stephen McCabe, Leader, 
Inverclyde Council
Councillor Susan Aitken, Leader, 
Glasgow City Council
Councillor Martin Rooney, Leader,
West Dunbartonshire Council
Councillor Joe Fagan, Leader, 
South Lanarkshire Council
Trees, woodlands, and forests have a vital role to play
in making Glasgow City Region resilient to the impacts
of a changing climate, helping to achieve ‘Net Zero’,
and repairing our damaged ecosystems;
Additional effort must be made to manage, protect
and enhance our existing trees and increase the number
of trees in urban and rural areas if we are to gain the
climate and ecological benefits that they can afford;
We must plan to deliver the benefits and values that
trees, woodlands, and forests can provide to all the
region’s people equally;
Delivering the change at scale required for our regional
tree, woodland and forest resource can only take place
over a long period with sustained resourcing;
GCR acknowledge that:
82

Page 83

7482 5/21 www.traffic-design.co.uk
The Clyde Climate Forest is 
being delivered with the help of:
The Clyde Climate Forest is
a Green Network Blueprint
delivery project.
Contact Us
Clyde Climate Forest
c/o TCV, Unit M1, Rosemount Workspace
141 Charles Street Glasgow G21 2QA
@ClydeClimateFor
www.clydeclimateforest.co.uk
83

Page 84

84

Page 85

Report
Agenda Item 
Report to: Climate Change and Sustainability Committee
Date of Meeting: 9 November 2022
Report by: Executive Director (Community and Enterprise
Resources)  
Subject:  Mid-Term Report on the Climate Emergency Fund 2021
to 2024 
1. Purpose of Report
1.1. The purpose of the report is to: -
[purpose]
 update members on where the £2million Climate Emergency Fund has been
directed to date, and the progress of the projects that have been funded so far.
[1recs]
2. Recommendation(s)
2.1. The Climate Change and Sustainability Committee is asked to approve the following
recommendation: 
(1) That the mid-term position in respect of the implementation of the Climate
Emergency Fund is noted.
[purpose]+
3. Background
3.1. The 2021/2022 Revenue Budget was approved by members at the Special Council
meeting on 24 February 2021. At that time, a package of investments totalling
£10.054 million was agreed, which included an allocation of £2 million for the Climate
Emergency Fund to be committed over a three-year period (2021-24). 
3.2. A report to the Climate Change and Sustainability Committee on 28 April 2021
informed members of the range and scope of the areas to which the £2 million
Climate Emergency Fund would be directed (covered in item 4).   
3.3. A further report to the Climate Change and Sustainability Committee on 3 November
2021 informed members of plans to formally launch the Climate Emergency Fund
community grant scheme, which is funded through the above Climate Emergency
Fund (covered in item 5.3). 
4. Climate Emergency Fund
4.1. Climate Emergency Funding is available to all Council Resources to progress
Sustainable Development and Climate Change projects.  The Climate Emergency
Fund is split into 5 key areas: 
 Staffing 
£680,000 of the fund was allocated to the recruitment of 7 officers (6.5 FTE) for
a period of 23 months to develop climate change projects. (See 4.2)
7
85

Page 86

 Development Fund 
£475,000 of the fund is allocated to a development fund which allows Services
to carry out feasibility studies on projects that meet the climate change
objectives. This helps to develop a pipeline of low carbon projects that are
investment-ready and that can lever in external funding or private investment. 
• Match Fund 
£445,000 of the fund is allocated to match funding. This allows Services to bid
for existing external funding opportunities that require Council match funding. 
• Projects/Pilots 
£250,000 is allocated to projects or pilot studies. This allows Services to
progress smaller projects or develop pilots that are fully funded by the Council.
These projects and pilots help identify benefits in advance of submitting larger
bids for funding (for example Levelling Up Fund, Green Growth Accelerator, UK
Shared Prosperity Fund).
• Community Grant Fund 
£150,000 of the fund is allocated to a community grant scheme to be
administered over a two-year period (2022-24). This allows local groups and
schools to bid for funding to develop and promote climate change and
sustainability focused projects within local communities. 
4.2.  Staffing
 Community and Enterprise Resources (3 posts)
Three posts within Community and Enterprise Resources were advertised in
July 2021, two progressed to interview. The Sustainable Development Officer
(Support) commenced employment from 11 October 2021 and the Sustainable
Development Officer (Funding) commenced employment from 1 November
2021. 
The Sustainable Development Officer (Support) resigned at the end of January
2022 and took up another post with another organisation. This post was,
therefore, readvertised in April 2022, with the job title changed to Sustainable
Communities Engagement Officer. The new Officer commenced employment in
July 2022. 
There were no suitable candidates for the Green Economy post either at this
time or when the post was re-advertised in November 2021 (see item 4.3). 
 Housing & Technical Resources (3 posts)
Three posts within Housing and Technical Resources were advertised in
August 2021, two were progressed to interview. One Strategy Officer (Built
Environment) commenced employment from 3 December 2021, and another
commenced employment from 21 January 2022. The Strategy Team Leader
(Built Environment) post was filled internally on 21 February 2022. 
 PHD Student (0.5 Post) 
It was agreed at the Climate Change and Sustainability Committee on 28 April
2021 that a Project Support Assistant (Sustainable Development) would also be
employed through a PHD student placement. The placement was advertised
jointly with Glasgow Caledonian University’s Centre for Climate Justice and
interviews took place on 31 August 2022.  A candidate has been selected and
the placement is due to begin in October 2022. The project scope is to
investigate the vulnerability of local communities to climate change and how we
can work together to build resilience in this area.
86

Page 87

4.3. Recruitment Issues
With regard to the Green Economy post, it has been noted that there is a skills
shortage in this area of work and that temporary contracts are less attractive in a
competitive recruitment market.  A lead officer in Economic Development has been
identified to deal with the Green Economy remit in the meantime. 
5.  Planned Spend
The £2million Climate Emergency Fund has been split over 3 years and is being
used to provide a range of opportunities for Council Resources and external groups
to source funding.  The projected yearly spend for the fund is: 
Spend in Year 1: £0.148m
Spend in Year 2: £1.110m
Spend in Year 3: £0.742m
Total Spend:  £2.000m 
5.1. Committed Spend
The table below sets out the actual spend for year one of the fund (2021/2022) and
the spending commitments for the fund in years two (2022/2023) and three
(2023/2024).  At the end of September 2022, there was an overall committed spend
of £1,889,725, with the remaining £110,275 still available to be committed to
projects.  Applications have been received from various Council Resources for many
interesting and innovative projects (see item 5.2). 
Climate Fund   
(£2 million) 
Spend
Financial Year
2021/22
Spend Committed
Financial Year
2022/23
Spend Committed
Financial Year
2023/24
Staffing £65,000 £339,340 £310,340
Development
Fund £0 £363,000  
Climate Match
Fund £27,500 £164,949 £191,675
Projects/Pilots £54,650 £220,771 £12,500
Community
Grants £0 £75,000 £75,000        
Total £147,150 £1,163,060 £589,515        
Total spend
committed for
2021-2024
£1,889,725    
Fund still to be
committed over
remaining 18
months of fund  
£110,275     
5.2.  Sustainable Development and Climate Change Projects (Internal)
23 projects have been approved through the Sustainable Development and Climate
Change Steering Group since the introduction of the fund. Due to the nature of the
87

Page 88

fund, many of these projects involve feasibility studies and external consultants. This
means that while the funding is allocated, it will not be released until the projects are
complete.  A full list of the projects that have been approved for funding is included in
Appendix 1, with case studies on those projects already completed or underway
provided in Appendix 2.   
Some highlights funded through the Climate Emergency Fund include:
 A programme of Carbon Literacy Training is being rolled out for Council staff
and elected members in conjunction with Keep Scotland Beautiful. 
 A project has been developed to accelerate the introduction of electric vehicles
into South Lanarkshire Fleet. 
 A feasibility study has been carried out and a Levelling Up funding application
has been submitted to create a Green Action Travel Project connecting paths
and cycle networks in rural South Lanarkshire and with neighboring authorities. 
 A Tree Canopy analysis has been carried out for the South Lanarkshire area
which will help better understand existing canopy cover and where projects
need to be targeted in the future.
 A Youth Forum on Sustainability and Climate Change has been created, with
representatives from all secondary schools. 
We will continue to monitor the projects and produce a final report at the end of the
3-year term of the fund. 
5.3. Community Grants 
It was agreed at the Climate Change and Sustainability Committee, on 3 November
2021, that £75,000 would be allocated from the Climate Emergency Fund in 2022/23
and 2023/24 to establish a Community Grants Scheme.  The Climate Emergency
Community Grants scheme was opened to applicants in January 2022. 
Grants of up to £2,500 are available to help community groups and partner
organisations who need funding to pursue sustainability, climate change or food
growing projects. 
5.4. Climate Emergency Community Grant Applications
At the end of September 2022, 23 community grants have been approved, with just
over £51,000 paid out to groups. The groups have until the end of March 2023 to
spend their funding and provide their updates for the projects. A full list of the
community grants that have been approved for funding is provided in Appendix 3,
with case studies on those projects already completed provided in Appendix 4. 
Some highlights funded through the Climate Emergency Community Grants include:
 Ballerup Nursery was awarded a grant to develop a nursery/community
allotment and garden area
 Blantyre Soccer Academy and Blantyre Bikes Better received funding to run a
cycling repair and holiday club
 Burnhill Action Group bid for funding from a variety of sources and have
redeveloped the ‘Highbacks’ area in Rutherglen into a community garden
 Stonehouse Eco Festival took place in May 2022. This was a community led
initiative to share ideas and promote a greater awareness of climate change
issues
 Waste Not Want Not received a grant to purchase equipment for their
community reuse and recycle Shop in East Kilbride 
88

Page 89

5.5. The initial promotion of the Community Grants Scheme has been very successful
and resulted in grant applications for many innovative community projects. We will
continue to promote the grants through social media, emails to community groups
and community councils, and with the help of partners. We recently published a View
article to coincide with Climate Week to highlight the inspiring projects that are
underway in the community. We will continue to promote the grants in this way and
will run regular articles on these projects in the View and on social media. 
5.6. Next Steps
In relation to the Climate Emergency Fund, for Community and Enterprise
Resources, the key objectives over the next year will be to: 
 Ensure that projects which have been awarded funding are progressed and
achieve the outcomes and benefits outlined by the Climate Emergency Fund
 Continue to process new Climate Emergency Fund bids, committing the
outstanding £110,275
 Continue to promote and administer the Climate Emergency Community Grants
to ensure £75,000 is allocated to projects in 2022/23 and 2023/24 
6. Employee Implications
6.1. Five full time officers have been employed on a 23-month basis through the Climate
Emergency Fund. As the recruitment has been unsuccessful for a specialist Green
Economy Officer, alternative options for this area of the fund have been developed.
The Project Support Assistant (PHD Student) is due to start in October 2022. 
7 Financial Implications
7.1. There are significant external funding opportunities available to the Council, for
example Levelling Up Fund, Green Growth Accelerator, and UK Shared Prosperity
Fund. The Climate Emergency Fund will continue to fund projects which provide
support for these types of external funding applications. 
8 Climate Change, Sustainability and Environmental Implications
8.1. The Scottish Government is committed to reach net zero greenhouse gas emissions
by 2045, with interim reduction targets of 75% by 2030 and 90% by 2040 (based on
1990 levels) and becoming carbon neutral by 2040. The Council has an obligation to
contribute to these targets and fulfil its duties under the Local Government (Scotland)
Act 2003 and the Climate Change (Scotland) Act 2009. 
8.2. Investment in these grants is helping the Council contribute to these national targets.
9 Other Implications
9.1. There are no other implications to report at this stage.   
10. Equality Impact Assessment and Consultation Arrangements
10.1. There are no impact assessment or consultations needed for this report. 
David Booth
Executive Director 
24 October 2022
89

Page 90

Link(s) to Council Values/Priorities/Outcomes 
Values
 Focused on people and their needs
 Fair, open and sustainable 
Priorities
 We will work to put people first and reduce inequality
 We will work towards a sustainable future in sustainable places
 We will work to recover, progress and improve 
Outcomes
 Our children and young people thrive
 Good quality, suitable and sustainable places to live
 Caring, connected, sustainable communities
 People live the healthiest lives possible
 Inspiring learners, transforming learning, strengthening partnerships 
Previous References
 Climate Change and Sustainability Committee 28 April 2021 – Climate Challenge
South Lanarkshire Fund 
 Climate Change and Sustainability Committee 3 November 2021 – Community Grants
(Climate Emergency Fund & Food Strategy Support Fund) 
List of Background Papers
 Intergovernmental Panel on Climate Change report 2018. 
 The Climate Change (Scotland) Act 2009 
 The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
 Sustainable Development and Climate Change Strategy 2017-2022
 Sustainable Development and Climate Change Strategy 2022-2027
 Biodiversity Strategy 2018 – 2022
 Biodiversity Duty Implementation Plan 2018 -2022
 Good Food Strategy 2020 -2025
 UN’s Sustainable Development Goals 
Contact for Further Information
If you would like to inspect the background papers or want further information, please
contact: -
Kathryn McCafferty, Sustainable Development Officer (Funding)
E-mail:  kathryn.mccafferty@southlanarkshire.gov.uk 
90

Page 91

Appendix 1 – Climate Emergency Fund Internal Projects 2021-2024 
Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
Development
Fund
Clydesdale
Way
Pathways
Project
Project to carry out a feasibility study to
create Southwest Scotland Green Action
Travel Project connecting paths and
cycle networks in South Lanarkshire to
neighbouring authorities in Borders and
Dumfries and Galloway creating a
complete network of local, regional, and
national routes. 
£50,000
• Encourage and enable active travel options
• Help improve local air quality
• Help create a safe and accessible path network
• Provide mapping and design to enable the
submission of a Levelling Up Fund bid  
Active Travel
Enhancement
A consultant will be appointed to
undertake an assessment of various
active travel options in South
Lanarkshire towns. Public consultation
will be undertaken, and the consultant
will help develop a UK Levelling Up
Fund bid. 
£50,000
• Progress key active travel infrastructure
improvement priorities for South Lanarkshire
• Identify priority projects for a Levelling Up Fund
bid
• Development work will be utilised for future
phases of active travel infrastructure
improvements 
Town
Centres
Transition to
Net Zero
Programme to secure the transition to
Net Zero for South Lanarkshire’s Towns.
Consultant will be appointed to identify
and develop a portfolio of projects for
future green infrastructure investments
and to support bids for major funding
opportunities
£98,000
• Progress key infrastructure improvement
priorities for South Lanarkshire towns to
achieve net zero
• Identify priority projects for Levelling Up Fund,
Green Growth Accelerator, UK Shared
Prosperity Fund bids
• Development work will be utilised for future
funding bids
91

Page 92

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
Primary
school
heating and
fabric
upgrade
feasibility
A consultant will be appointed to carry
out a feasibility study into the scope of
work required to upgrade the primary
school estate to zero carbon by 2038.
The feasibility will look at five primary
schools of different ages to then role the
out for the primary school estate. 
£60,000
• Identify measures and suitable technologies to
be implemented across the primary school
estate
• Establish priorities for future investments
required to meet net zero 
• Help to develop future bids to funds such as
the Public Sector Estate Decarbonisation
Scheme and the Heat Network Fund 
Primary
school PV
feasibility
A specialist consultant will be appointed
to carry out desktop study of the 128
primary schools. Existing  data will be
used to assess the schools,  consider if
the roofs can have PV panels installed,
or in the case of the existing PV arrays
on the school roofs, could these be
expanded or increased
£15,000
• Calculate a potential reduction in greenhouse
gas emissions
• Model energy savings generated by the PV
panels
• The findings will be used to inform future
programmes of works through various funding
streams to install or expand the installation of
PV panels on primary school roofs
Zero
emissions
upgrades to
wet leisure
properties 
Feasibility study into the works required
to meet the Scottish Government zero
emissions targets by 2038 and reduce
heat demand in the properties at wet
leisure properties. 
£20,000
• Identify measures and suitable technologies to
be implemented across the council’s wet
leisure properties, 
• Establish priorities for future investments
required to meet net zero
• Help to develop future bids to funds such as
the Public Sector Estate Decarbonisation
Scheme and  the Heat Network Fund
92

Page 93

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
Ballerup
Pavilion
options
appraisal 
Options appraisal into the works
required to meet the zero emissions
targets by 2038 at Ballerup Pavilion
including the fabric first measures and
low carbon heating upgrade.
£15,000
• The options appraisal will allow us identify
measures and suitable technologies to be
implemented in the property upgrading the
whole building envelope 
• The findings will provide recommendations for
works which will be scaled across similar build
types.
Cycle Hire
Feasibility
Study
Feasibility study into developing a bike
hire scheme in South Lanarkshire.
Various options of bike hire scheme will
be considered in the study including the
business case potential for joining
Glasgow City Council’s Nextbike
scheme.   
£25,000
• Identify potential funding and contract models
using successful schemes from around the
country
• Identify key areas and key benefits of the bike
hire scheme
• Allow a bike hire business case and model to
be developed for South Lanarkshire.
• Identify priorities in relation to providing or
improving active travel infrastructure 
Calderwood
Multi Storey
Blocks district
heating
feasibility 
RIBA Stage 2 feasibility for a potential
Ground Source Heat Pump (GSHP) and
district heating project centred around
six tower blocks in East Kilbride which
are currently heated by aging electric
storage heating.
£30,000
• Demonstrate that technologies such as GSHPs
and local district heating networks can be
scaled to work in the domestic sector
throughout South Lanarkshire.  
• Identify the project’s environmental benefits,
costs and potential challenges
• Provide recommendations for future works
which could be scaled across council’s
domestic and non-domestic properties.
93

Page 94

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
Climate
Match fund
Tree canopy
analysis
Match funding for the analysis of aerial
photography funded by the Green
Network Partnership and Clydeplan. The
information is specific to South
Lanarkshire and will help better
understand existing canopy cover and
where projects need to be targeted in
the future. 
£7,000
• Evaluate carbon off set from tree canopy cover
• Help understand existing tree canopy cover in
South Lanarkshire
• Help with future external funding bids 
ECO stars
Match funding with Scottish Government
to continue EcoStars within South
Lanarkshire Fleet and the Taxi and
Private Hire Scheme. Both schemes
engage with a network of fleet operators
and encourages positive action against
contributions to local transport related
emissions. 
£20,000
• Promote sustainable and environmentally
responsible transport
• Improving local air quality
• Reduce fuel consumption
• Raise fuel efficiency awareness
• Promote cleaner vehicles 
Nature
Restoration
Fund
Match funding with Scottish Government
Nature Restoration Fund to focus on:
• Peatland and Wetland
Management & Development
• Local Nature Reserve
Management & Development
• Enhancing Canopy Cover
• Outdoor Education
• Develop Management Plans
• Enhance Wildflower Cover for
pollinators
£146,000
• Deliver positive effects for biodiversity and
enhance local ecosystems
• Address the climate emergency by promoting
nature-based solutions
• Promote the health and well-being of local
communities 
94

Page 95

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
Clyde
Climate
Forest
Match funding for the supply and
planting of 4,000 trees to increase tree
canopy cover. Clyde Climate Forest and
its partners will engage and promote
volunteers/community groups to plant
the trees.
£7,500 • Increased tree canopy cover 
Outdoor
classroom for
Duncanrig
ASN Base
Match funding to build an outdoor
classroom for the Additional Needs
Support base at Duncanrig High School 
£3,000
• Increased opportunity for learning outdoors
• The space will be used to encourage
awareness and responsibility for the natural
environment amongst pupils
Love to Ride
South
Lanarkshire
Match funding with Smarter Choices,
Smarter Places to extend the ‘Love to
Ride’ online behaviour change
programme and platform which supports
inclusive cycling. 
£8,949
• Encourage travel behaviour change
• Support the uptake of cycling
• Support a higher uptake of active and
sustainable options, especially for local
journeys
• Reducing single occupancy car journeys
• Help meet our air quality objectives
Better Points
active travel
project
Match funding with Scottish Government
Air Quality Action Plan grant to establish
a travel behaviour change project which
focuses on residents, schools, and
workplaces to increase active and
sustainable travel within our local
communities
£31,675
• Encourage travel behaviour change
• Support a higher uptake of active and
sustainable options, especially for local
journeys
• Reducing single occupancy car journeys
• Impact emissions levels
• Help meet our air quality objectives
Projects/
Pilots Youth Forum
Project to set up a Climate Change &
Sustainability Youth Forum.  The group
will assist in raising awareness within
the school community, gathering
information on initiatives already
£52,500
• Raise awareness of climate change within the
school community
• Gather information on initiatives already
operating within schools and upsize those with
most impact 
95

Page 96

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
operating within schools, and
considering how we can upsize those
with most impact. Members of the
Forum will also attend COP26 and host
an SLC COP26 event to raise
awareness. 
Climate
Training
Develop a programme of climate
emergency training across the Council. 
This will involve the design of a climate
emergency training course bespoke to
South Lanarkshire and delivery of the
training to the first 100 people –
primarily aimed at elected members and
senior management. 
£20,000
• Increase understanding of the global, national
and local climate emergency
• Mainstream climate action in decision making
across the Council. 
Fleet Electric
Vehicle
transition
Project to accelerate the introduction of
Electric Vehicles (EVs) by assisting with
the identification and assessment of
fleet charging locations, EV user
familiarisation, managing EV
charging/charging network and
developing day to day arrangements
required to embed EVs in the fleet. 2
staff members have been appointed to
carry out these duties on a 2-year
contract.
£97,500
• Reduced emissions
• Accelerate the introduction of EV
• EV user familiarisation
• Manage the EV charging/charging network 
Universal
Connections
Electric Bikes
Funding to purchase 2 electric bicycles
and secure storage at each of the 9
Universal Connections sites across
South Lanarkshire. The bikes will be
used by staff to deliver youth outreach
£51,300
• Reduced emissions
• Promoting sustainable transport within the
community
• Increased active travel opportunities
96

Page 97

Climate
Emergency
Fund
(£2 million)
Projects Project Details Funding
Approved Expected Outcomes
work in the community.
Right Stuff
Right Bin
Adhesive stickers to be attached to
wheeled bins in flats throughout South
Lanarkshire to advise householder of
changes to the service.  Stickers can
also be used in problematic areas to
remind householder of correct recycling
practices. Leaflets also to be issues to
all flats.
£15,470
• Improve recycling rates and reduce rubbish
going to landfill
Area-wide
emissions
route map
To commission an external consultant to
help develop a route map which sets a
pathway to net-zero for South
Lanarkshire
£35,000
• Identify the biggest contributors to South
Lanarkshire’s emissions
• Outline the scale of reduction required to meet
net-zero by 2045
• Provide details of cost effective, carbon
effective and transformational action required
to meet net-zero.  
• Outline the earliest that South Lanarkshire
could achieve net-zero
• Outline the investment required to meet net-
zero
Reverse
Vending
Machine for
St Andrews
and St Brides
High School
Purchase a Reverse Vending Machine
for trialling the Return Deposit Scheme
in St Andrews and St Brides High
School
£14,000
• Reduces the number of plastic bottles going to
landfill or being discarded
• Minimises staff time associated with the
manual processing of returned containers
• The device securely compacts the containers
minimising the storage space required meaning
the material is collected as efficiently as
possible.
97

Page 98

Appendix 2: Climate Emergency Fund Internal Projects – Case Studies 
Internal Projects  Project Information and Update
Climate Training  Funding was provided to develop a programme of climate emergency training across the Council.  
Project outcomes to date:
• A bespoke Carbon Literacy Training Programme was developed for South Lanarkshire with Keep
Scotland Beautiful. 
• First round of training is now complete with over 100 employees trained. 
• Some feedback from participants:  
“Very interesting and thought-provoking course and the speakers came across as very
knowledgeable”
“I really enjoyed the course and learned a lot but wondering how I will fit in time for assignment. I
would have liked some tips as to how as an individual I can reduce my carbon footprint”
“I very much enjoyed the training including the background science stuff. It could be more tailored
to South Lanarkshire in terms of what we have been doing and what we could and should be doing”
“I thought the pace/content / timing was spot on. It certainly kept me engaged throughout, and the
level of ‘homework’ wasn’t too onerous, and it complimented the main sessions”
• Currently looking at options to develop the training for elected members. Options include 90-minute
webinars and an eLearning course. 
98

Page 99

Internal Projects  Project Information and Update
Clyde Climate Forest Match funding with Clyde Climate Forest for the supply and planting of 4,000 trees to increase tree canopy
cover in the area.
Project outcomes to date:
• 4,000 trees have been supplied and planted with community involvement in some areas. 
• We have engaged with communities on the environmental and climate change agenda.
• We have carried out tree planting in urban areas where there is low levels of tree canopies and
where the communities are vulnerable to the impacts of a changing climate due to heatwaves or
heavy rainfall events. 
Clydesdale Way
Pathways Project
Funding was awarded for a feasibility study to create a Green Action Travel Project. The aim is to connect
paths and cycle networks in South Lanarkshire, to link isolated communities in rural Clydesdale and
neighbouring authorities, creating a network of local, regional, and national routes. The study will provide
the essential mapping, design and costs to enable the submission of a joint Levelling Up funding
application between South Lanarkshire, Scottish Borders and Dumfries and Galloway Councils. 
Project outcomes to date: 
• External consultant, Ironside Farrar, successfully tendered for the project. 
• A Strategic Business case and RIBA Stage 2 Concept Design Report have been produced. 
• A Levelling Up Fund Bid was submitted for the project in July 2022
• The decision on the Levelling Up Bid is expected October /November 2022.
• The contract has been extended to develop a consultancy brief for the next stages of the design.
These will be tendered on condition Levelling Up Bid is successful.  
99

Page 100

Internal Projects  Project Information and Update
EcoStars for South
Lanarkshire Fleet, Taxi
and Private Hire 
Match funding with Scottish Government to continue EcoStars within South Lanarkshire Fleet and the Taxi
and Private Hire Scheme. 
Project outcomes to date: 
ECO Stars has been a key action in promoting sustainable and environmentally responsible transport
within South Lanarkshire and, alongside other interventions such as infrastructure changes and promotion
of cleaner vehicles, forms part of South Lanarkshire Council’s Action Plan for improving local air quality.
Since inception, South Lanarkshire ECO Stars has built an engaged and growing membership of local
fleet operators, with tailored advice supplemented by fuel efficiency member workshops. An emissions
toolkit has also been developed to provide a quantitative estimate on the impact on emissions following
the interventions as identified via the ECO stars bespoke fleet advice to operators. The South Lanarkshire
fleet scheme has successfully recruited 231 commercial vehicle operators as members. These members
operate over 8,900 commercial vehicles in the local area. 
The next step is a bespoke “Road Map” which outlines the assessment findings and contains tailor-made
advice to help improve the efficiency of the operator’s fleet. 
Fleet Electric Vehicle
Transition
This project was awarded funding to support the council’s transition from diesel vehicles to Electric
Vehicles (EVs). Two staff members have been appointed to carry out these duties on a 2-year contract. 
Project outcomes to date: 
• Over 70 staff have been trained to charge/drive EVs
• Daily support is provided for staff including help with charging issues, vehicle familiarisation, fault
support
• 48 charge points have been installed and are operational
• 46 further charge points to be installed
• Management of  the EV charging projects, regular liaison with EV charging supplier and SLC site
representative
• This project is supporting SLC’s transition from diesel vehicles to EVs 
Right Stuff, Right Bin This is an educational project to target problematic areas and to remind householders of correct recycling
100

Page 101

Internal Projects  Project Information and Update
practices. Adhesive stickers will be attached to wheeled bins in flats throughout South Lanarkshire to
advise householder of changes to the service. 
Project outcomes to date: 
• Project is at development stage; however, targeted areas will be recycling facilities in flats which
are continually contaminated. 
• Leaflets and stickers have been produced (see sample below) and the project will be rolled out in
early 2023. 
Tree Canopy
Analysis
Match funding has been provided for the analysis of aerial photography funded by the Green Network
Partnership and Clydeplan. The information is specific to South Lanarkshire and will help better
understand existing canopy cover and where projects need to be targeted in the future. 
Project outcomes to date:
• The desktop evaluation of 3,485 individual council trees (includes removed trees) has been
completed, focusing on the Clyde Climate Forest target neighbourhoods. This is from resource of
101

Page 102

Internal Projects  Project Information and Update
circa. 63,847 individual trees. 
• The calculation of total ecosystem benefits, value and savings in monetary terms (£126,080 pa)
provided by the 3,185 subject trees has been completed.  
• An easy-to-use record of the subject tree demographics (including species composition, quantity,
quality, and age diversity) has been created. 
• We now have statistics and evidence to start informing  more resilient and diverse tree species
selection and to help inform future funding bids. 
TreePlotter – South Lanarkshire Council (pg-cloud.com) 
Youth Forum & Climate
Emergency Newsroom
Education Resources have established a Youth Forum on Sustainability and Climate Change, with
representatives from all secondary schools. 
Project outcomes to date: 
During COP26, 80 secondary pupils participated in a Climate Emergency Newsroom (CEN). Although the
target audience was primary pupils, through their high-quality reporting, the young journalists gained a
national and international audience. News content was hosted on a blog offering video and written
interviews with politicians, scientific experts, climate activists and other organisations. The blog also
covered the science behind climate change, the impact on our planet and what we can do about it. Due to
the high-quality content produced, our primary schools, and many others, were able to feel connected to
102

Page 103

Internal Projects  Project Information and Update
and learn from COP26, deepening their understanding of issues, encouraging them to speak out and find
ways to work towards net zero. 
Educational professionals have reached out from across the country to commend the CEN on their work.
132 articles were published, including interviews with activists, scientists and politicians, generating more
than 20,000 views. There were more than 1 million views of CEN tweets and the work was acknowledged
in a motion to the Scottish Parliament. 
The Youth Forum has run its own 'COP' (called COS1 - Conference of Schools 1) to further raise
awareness of climate issues. 
103

Page 104

Appendix 3 – Community Grant Applications approved January 2022 – September 2022
Group/Partner Organisation Project details  Grant
Amount
Allers Allotments Solar PV system for allotment shed £2,206
Ballerup Nursery Develop the nursery allotment and garden area £2,445
Biggar and District Men's Shed A polytunnel with irrigation for community allotment £1,805
Blackwood Primary Purchase scooters and bikes for children to travel to school / £2,500
Blantyre Soccer Academy Programme of cycle training, bike repair and prepare sessions £2,500
Burnhill Action Group Purchase of a cabin which will provide the kitchen space for healthy
eating sessions to be delivered  £2,500
Calderwood Primary  School/community garden project to include an outdoor classroom, bee
and butterfly garden  £2,500
Carluke Primary  Create a greenhouse/ garden area in playground £2,500
Clyde Cycle Park SCIO Buy 5 adult bikes for the ‘On Yer Bike’ project £2,500
Families Like Us Create book for pre-school and lower primary school children to teach
how we can be more environmentally friendly £2,500
Hareleeshill Primary Purchase and build raised beds / seeds and plants £2,500
Heathery Knowe Primary School and
Nursery Inclusive sensory garden, tree, planting, bird boxes, shed, planters etc. £2,500
ISKCON Scotland The funds will be used for harvest festival.  £2,500
Kirktonholme Primary School sustainability project focussing on recycling, composting
renewable energy, tree planting, bee keeping £2,500
Lammermoor Allotments Association Purchase shed, shed base, solar lighting pack & wheelie bins £2,490
Lanarkshire Real Nappy Project Purchase new nappy kits to hire, marketing materials for project £800
LEAP Community Growing Space Install a wood workshop space within the community growing space, create £2,500
104

Page 105

Group/Partner Organisation Project details  Grant
Amount
raised beds and planters from recycled timber.
Royal Highland Education Trust  Run a Food and Farming Day at Museum for Rural life £2,500
St Bride’s Primary  Open a Community Farm Shop, purchase polytunnel, gardening
equipment £2,500
Stonehouse Eco Festival Programme/booklet and printed publicity materials to support the Eco
Festival £1,000
Udston Primary School Improvements to outdoor space, outdoor storage shed for the playground  £2,500
Upper Clyde Parish Church Create a community orchard and allotment  £2,000
Waist Not Want Not Community reuse shop - equipment  £1,500 
105

Page 106

Appendix 4: Climate Emergency Community Grants – Case Studies 
Community Projects Project Information and Update
Ballerup Nursery
Garden
Ballerup Nursery was awarded a grant to develop a nursery/community allotment and garden area. 
Project outcomes achieved to date: 
• The garden area has been successfully developed with grant money used to purchase planters,
tools, soil and seeds. 
• The children are very engaged in the outdoor environment and look forward to working in and
maintaining the allotment area.
• The nursery encourages parental engagement by hosting ‘stay and plant’ sessions within the
nursery garden. 
• The allotment helps to promote healthy food choices and provides sustainable learning
opportunities.
• From next year the nursery hope to provide vegetable parcels with recipes for families to take
home. 
• The project will continue to develop over the years and has already had a positive impact on
learning for the children, their families, and the nursery community. 
106

Page 107

Community Projects Project Information and Update
Biggar Men’s Shed
Polytunnel and
Irrigation System
In March 2022, Biggar and District Men’s Shed were awarded £1,805 to purchase and install a polytunnel
and irrigation system at their community allotment site. The project will allow the allotment to expand and
flourish, encourage more community participation, and allow members to grow their own produce. The
expected benefits are a more sustainable food chain and more people engaging and participating in the
community allotment. The polytunnel has been purchased and is under construction. 
Blantyre Soccer
Academy & Blantyre
Bikes Better Cycle
Project
Blantyre Soccer Academy and their partner organisation Blantyre Bikes Better were awarded funding to
run a Spring programme of cycle training, bike repair sessions and group cycling sessions to
encourage residents to get on their bikes. 
Project outcomes achieved to date: 
• A bike borrowing and bike repairs scheme has been run from April 2022 to present, this has seen
many people contact the group for simple repairs like punctures and chain problems. More
complex repairs are referred to Halfords where the group have a partnership agreement to allow
people to get their bikes fixed at a discounted rate. The Repairs services has an average of 10
requests each month. 
107

Page 108

Community Projects Project Information and Update
• The group is currently running a Bikeability level 1 at Chatelherault Primary in Hamilton. This will
continue onto level 2 in the spring term. They have also provided borrowing bikes to High Blantyre
Primary and St Johns Primary (Hamilton) to allow them to facilitate their own Bikeability and
encourage pupils to cycle to school. 
• Throughout the Spring holiday (2022) the group ran projects in the Hamilton and Hillhouse areas
to allow children and families to take part in bike borrowing and challenges to increase the number
of miles they could travel using active travel. This was very successful with an average of 60
participants each day with many parents joining in.
• The schools and other participants give details of how many miles they cycle each month. The
group will collate this information and report how many miles cycled at the end of the project (due
March 2023). 
108

Page 109

Community Projects Project Information and Update
Burnhill Action Group
Community Garden
Burnhill Action Group were awarded a grant of £2,500 to continue the development of land commonly
known as The Highbacks. The group aim to develop the land into a safe, welcoming outdoor space that 
the whole community can enjoy. Funds will be used to building planters and raised beds to grow fruit
and vegetables, and to build a cabin/shed to be used as a community space. At the time of the award
the group had secured £4,200 in participatory budgeting funds and in June 2022 they were awarded
£7,000 from The Asda Foundation.   
Projects outcomes achieved to date: 
• The funds awarded have been used to continue the development of the land commonly known as
‘the Highbacks’.  Raised beds have been built and fresh produce has been grown this year and the
group have made jam and soup with products grown. 
• The group have erected the “Highbacks Hideaway” cabin which will allow activities to run over the
winter. A coffee hut is run as a social enterprise with any profits invested back into the project.  
• The group has hosted 2 large community events this year, welcoming around 300 residents as well
as hosting coffee mornings, outdoor bingo and exercise sessions.
• The development of the land has seen a massive reduction in fly tipping and anti-social behavior in
the area.  Young people are eager to get involved in the project, helping out with grass cutting,
growing and building. 
• 24 local volunteers are dedicated to making the Highbacks a thriving community space with
opportunities to plant, grow and harvest produce.  They have identified several local residents who
are very experienced gardeners and keen to share their knowledge with their neighbours. 
• All activities, courses and events are open to all in Burnhill and the surrounding areas. Volunteers
offer a warm welcome and all local people are encouraged to get involved. 
109

Page 110

Community Projects Project Information and Update 
• Feedback from residents and users: 
“it’s all looking fabulous and keeps going from strength to strength, well done to every one of you” 
“such an enjoyable morning at the first coffee morning, the Highbacks have been totally
transformed by local families, creating an amazing space where the community can come together
all year round.. community doing it for themselves” 
“thanks for organising this community day, my kids have had a ball and I have met people I haven’t
seen for years, it’s been a great day” 
110

Page 111

Community Projects Project Information and Update 
“
Calderwood Primary
Outdoor Classroom
A grant was awarded to Calderwood Primary to
support their outdoor classroom project. 
Project outcomes achieved to date: 
• The outdoor classroom encourages teachers
to take learning outdoors as much as
possible, in all weathers. 
• The outdoor classroom and areas within the
garden will be timetabled for use by the
whole school. 
• Pupils will take part in class topics about the
environment and climate change within the space.
• “Our children and staff have loved making use of this fantastic outdoor space and it is used
regularly for a variety of different lessons. Our outdoor classroom is also well used at playtimes
and lunchtimes as a reading nook for all our children.” Julie Kirkland, Depute Head Teacher 
111

Page 112

Community Projects Project Information and Update
Lammermoor
Allotments
Association
Lammermoor Allotments Association were awarded a grant to purchase a shed, shed base and solar
lighting pack for the allotment site. The shed will be used as a ‘Share Shed’ for sharing seeds, produce,
tools and knowledge. It will provide a hub for social events and a shelter area from adverse weather. 
Project outcomes achieved to date: 
The shed has been purchased and built. The next stage of the project is to install the solar lighting and to
set up the tool/resource sharing and provide furniture for a rest area. The shed will then be opened to all
members. 
Stonehouse 
Eco Festival
A grant was awarded to the Stonehouse Eco Festival which took place in May 2022. This was a
community led initiative to share ideas and promote a greater awareness of climate change issues. The
grant allowed the group to produce an informative programme and publicity materials to promote the
event. 
Project outcomes achieved to date: 
• The event had a big community turnout from around Lanarkshire with councillors, leaders of
council, MSPs and MPs attending. 
• Over 20 national and local organisations attended the event. 
112

Page 113

Community Projects Project Information and Update
• The organisers have produced an event guide for communities seeking to establish their own
events. 
• Some feedback from participants:  
“Loved the event, inspiring”. 
“As your first Eco Festival, and being unable to determine attendance numbers, you covered all
bases well” 
“Great for networking and also support from local councillors and MSP” 
“Fantastic event, the event co-ordinators were very friendly and helpful, I have a fantastic day” 
“I thought the whole event was excellently run and was very happy to have been part of it!” 
Waste Not Want Not
Community Reuse
Shop 
A grant was awarded to reuse shop Waste Not Want Not to purchase 
essential equipment including washing machine, scales and storage to
increase the capacity of the reuse shop and reduce items going to landfill.   
Project outcomes achieved to date: 
“The Climate Emergency Fund allowed us to purchase a 12kg washing
machine and tumble dryer, scales and more storage for our stock room for
sorting items. 
We are now able to wash items that we would previously would have gone to cash for clothes or landfill. 
In July we saved 1254.8kg of clothing and textiles that would otherwise have gone to landfill. These
items have either been reused, repaired and re-loved. 
The scales enable us to keep statistics, any items that are donated are weighed before they enter the
113

Page 114

Community Projects Project Information and Update
stock room. 
We now have over 400 members of our clothes swap service on top of that we have many people who
use the shop to purchase items which are donated”. 
Jan Thomson, Project Manager, Waste Not Want Not. 
Support available for groups as Climate Week gets underway - South Lanarkshire View 