Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
5 February 2025 
NOTICE OF MEETING 
A meeting of the OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP will be held in
the ON A HYBRID BASIS AT THE MCCAIG SUITE, CORRAN HALLS, OBAN AND ON
MICROSOFT TEAMS on WEDNESDAY, 12 FEBRUARY 2025 at 2:00 PM, which you are
requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. WELCOME AND APOLOGIES 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Oban, Lorn and the Isles Community Planning Group 13 November 2024
(Pages 5 - 14) 
4. AREA COMMUNITY PLANNING GROUP GOVERNANCE ARRANGEMENTS IN
ARGYLL AND BUTE (Pages 15 - 26)  
Report by Committee Manager, Argyll and Bute Council 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE MEETING
(Pages 27 - 30)  
Report by Committee Manager, Argyll and Bute Council 
6. ASPIRING PLACES - COMMUNITY PROJECTS IN ARGYLL AND BUTE (Pages 31
- 40)  
Presentation by Stuart Green, Corporate Support Manager, Argyll and Bute Council 
Public Document Pack

Page 2

7. ALI-ENERGY (Pages 41 - 42)  
Report by Dr Lynda Mitchell, ALIenergy 
8. TRANSPORT SCOTLAND 
(a) Transport Scotland Partner Update (Pages 43 - 46) 
Report by Ian Woodcock, Transport Scotland 
(b) A83 Rest and Be Thankful Operational and Landslip Management (Pages
47 - 52) 
Presentation by Ian Woodcock, Transport Scotland 
9. FERRY CONSULTATION (Pages 53 - 106)  
Report by Kelly McKellar, Project Manager, Roads and Infrastructure 
10. PARTNERS UPDATE 
(a) Police Scotland (Pages 107 - 112) 
(b) Scottish Fire and Rescue (Pages 113 - 118) 
(c) Argyll and Bute Health and Social Care Partnership Public Health Update
(Pages 119 - 124) 
(d) Crossroads Update (Pages 125 - 126) 
(e) Living Well Network Update (Pages 127 - 128) 
(f) Argyll and Bute TSI (Pages 129 - 130) 
(g) UHI Argyll (Pages 131 - 132) 
(h) Opportunity for Verbal Updates 
11. CLIMATE CHANGE 
(a) Argyll and Bute Climate Action: Developing a Climate Change Strategy
and Action Plan for Argyll and Bute (Pages 133 - 188) 
Report by Andy MacPherson, Climate Change Project Manager, Argyll and
the Isles Coast  and Countryside Trust 
(b) Opportunity for Verbal Updates on community based initiatives 
12. COMMUNITY FOCUS 
(a) Oban Lorn Rugby Club Development Plans 
Presentation by Ronald Gordon, Oban Lorn Rugby Club 
13. DATE OF NEXT MEETING - WEDNESDAY, 14 MAY 2025

Page 3

Oban Lorn & the Isles Community Planning Group 
Colin Buchanan (Chair) Councillor Julie McKenzie (Vice-Chair) 
Contact: Stuart McLean, Committee Manager - 01436 658717 Karen Campbell, Senior
Committee Assistant - 01631 567855

Page 4

This page is intentionally left blank

Page 5

MINUTES of MEETING of OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP held
ON A HYBRID BASIS AT OBAN COMMUNITY FIRE STATION, SOROBA ROAD, OBAN, PA34
4SB AND ON MICROSOFT TEAMS 
on WEDNESDAY, 13 NOVEMBER 2024 
Present:  Colin Buchanan  (Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council
Councillor Kieron Green, Argyll and Bute Council
Councillor Amanda Hampsey, Argyll and Bute Council
Councillor Willie Hume, Argyll and Bute Council
Councillor Andrew Kain, Argyll and Bute Council
Councillor Luna Martin, Argyll and Bute Council
Robert Taylor, Scottish Fire and Rescue
Maureen Evans, Community Learning Services, Live Argyll 
Sarah Peacock, Argyll and Bute Health and Social Care Partnership
Seonaid Cameron, ACHA
Jim Tolmie, Oban District Access Panel
Catriona Petit, Hope Kitchen
Duncan Martin, Oban Community Council
Sue Barnard, Oban Community Council 
Kirsty McLuckie, Community Development, Argyll and Bute Council
Carol Flett, Co-Ordinator, Living Well Network 
Petra Pearce, Argyll and Bute Third Sector Interface
Mary Braithwaite, Luing Community Council
Jane Metcalf, Coll Community Council
Becky Hothersall, The Poverty Alliance 
Attending: Susan Donnelly, Corporate Resilience Manager, Argyll and Bute Council
Belinda Ruthven, Resilience Officer, Argyll and Bute Council
Iain MacInnes, Strategic Transportation Policy Officer, Argyll and Bute
Council
Luke Frederick Horner, Digital and Projects Support Officer   
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting, and thanked Robert Taylor, Scottish
Fire and Rescue for hosting the meeting. 
Apologies for absence were intimated on behalf of: 
Susan MacRae, Skills Development Scotland
Joan Best, Crossroads
Sgt Matt Shaw, Police Scotland
John McLuckie, Argyll and Bute Council
Andy MacPherson, Argyll & the Isles Coast and Countryside Trust
Page 5 Agenda Item 3a

Page 6

Ian Woodcock, Transport Scotland
Councillor Julie McKenzie, Argyll and Bute Council
Councillor Jim Lynch, Argyll and Bute Council 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
(a) Oban, Lorn and the Isles Community Planning Group 14 August
2024 
The Minute of the Oban, Lorn and the Isles Area Community Planning
Group meeting held on Wednesday 14 August 2024 was approved as a
correct record. 
4. GOVERNANCE 
(a) Appointment of Vice Chair to the Oban, Lorn and the Isles Area
Community Planning Group 
The Group gave consideration to a report providing information on the role
of Vice-Chair of the Oban, Lorn and the Isles Area Community Planning
Group. 
The Committee Manager advised that he had received an intimation of
interest from Councillor Julie McKenzie in this position and invited
nominations from Partners.   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
unanimously agreed to appoint Councillor Julie McKenzie as Vice-Chair,
subject to her acceptance of this position. 
(Reference: Report by Committee Manager, dated 13 November
submitted) 
5. COMMUNITY PLANNING PARTNERSHIP FULL PARTNERSHIP MEETING 
The Group gave consideration to a report which outlined matters discussed during
the Community Planning Partnership (CPP) Full Partnership meeting held on 16
September 2024. The report provided information on the Argyll and Bute
Employability Partnership Delivery Plan for 2022-25; the CPP initiative to develop a
Climate Change Strategy and Framework; the history of Community Wealth Building
within the Community Planning Partnership; the key priorities for the new Regional
Transport Strategy for the development of transport in the region over the next 20
years; the current housing emergency and the action plan agreed in June 2024 and
the proposed Population Health Framework for Scotland which is to be adopted by
the Scottish Government, CoSLA, Public Health Scotland and Health Boards. 
Decision
Page 6

Page 7

The Oban, Lorn and the Isles Area Community Planning Group noted the contents of
the report. 
(Reference: Report by Committee Manager, Argyll and Bute Council, dated 5
November 2024, submitted) 
6. ARGYLL AND BUTE HEALTH AND SOCIAL CARE PARTNERSHIP 
(a) Partner Update - Public Health 
Consideration was given to a public health update from Argyll and Bute
Health and Social Care Partnership’s Public Health Team on the ongoing
wellbeing and prevention activities overseen and delivered by them in
Argyll and Bute. The update provided information on the work of the
Smoking Cessation Advisers who have been promoting the Stoptober
Campaign by raising awareness of the service;  the continued work to
increase awareness of the five adult screening programmes; the work of
the Living Well Networks and the community events held by them; the
launch of Year 5 of the Living Well Grants; The Argyll and Bute Joint
Strategic Needs Assessment which will be published in November and the
Art of Hosting method used to engage with communities. 
The report also provided information on alcohol and drug prevention and
early intervention programmes; work commissioned by Scottish Families
Affected by Alcohol and Drugs; ongoing work to support the recovery
community in Argyll and Bute and the engagement being taken forward by
the Alcohol and Drugs Partnership Support team. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Health Improvement Senior, Argyll and Bute Health
and Social Care Partnership and Alcohol and Drug Partnership
Coordinator, Argyll and Bute Health and Social Care Partnership, dated
October 2024, submitted) 
(b) Public Health Annual Reports: What does the work of the Argyll and
Bute Alcohol and Drug Partnership and Public Health mean for
Community Planning? 
The Group gave consideration to a presentation from Sarah Peacock,
Health Improvement Senior, Argyll and Bute Health and Social Care
Partnership which provided information on the Argyll and Bute Alcohol
and Drug Partnership. The presentation highlighted that the mission of the
Partnership is to work with and for communities and organisations in
Argyll and Bute to prioritise equality, diversity and health and wellbeing
and foster environments and partnerships to nurture and support all. 
Sarah also outlined the Partnerships vision for a thriving Argyll and Bute
where everyone has the opportunity to live well in vibrant, flourishing
Page 7

Page 8

communities. Sarah asked the Group for feedback on how they would like
to receive information on the Partnerships work and how they would want
to be involved with the work of the Public Health Team. 
It was noted that NHS Highland Annual Review Meeting, is due to be held
on Tuesday, 19th November in the Council Offices in Lochgilphead, this
meeting is open to the public. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group: 
1.  noted the information provided; and 
2. agreed to provide feedback on the questions asked, to the Health
Improvement Senior following the meeting. 
(Reference: Presentation by Health Improvement Senior, Argyll and Bute
Health and Social Care Partnership) 
7. COMMUNITY RESILIENCE 
Consideration was given to a presentation from Susan Donnelly, Corporate
Resilience Manager from Argyll and Bute Council in relation to Community
Resilience in Argyll and Bute. The presentation highlighted the importance of
communities and individuals harnessing resources and expertise to prepare,
respond and recover from emergencies, in a way that complements the work of
emergency responders. 
The presentation also provided information in relation to why Community Resilience
is so important, including details of potential risks and statutory sites; how
Community Resilience is managed in Argyll and Bute; recent and future workstreams
of the Resilience team and ongoing activity across the Oban, Lorn and the Isles
area. The presentation also provided details on how Partners could engage with
Argyll and Bute Council in achieving resilient communities across Argyll and Bute
and that there is a Resilience Fund available to Community Councils to apply to for
assistance:- 
https://funding.idoxopen4community.co.uk/argyllbute/News/View/GRUKBP3!N79817 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the information
provided. 
(Reference: Presentation by Corporate Resilience Manager, Argyll and Bute Council
and Resilience Officer, Argyll and Bute Council) 
8. TELECARE AND BROADBAND UPDATE 
Consideration was given to a presentation regarding the Public Switched Telephone
Network (PSTN) from the Strategic Transportation Policy Officer and Digital and
Page 8

Page 9

Projects Support Officer, Argyll and Bute Council. The presentation provided
information on the UK Government Guidance which highlighted that there would still
be an option for a ‘landline only’ service as the Communications Act (2003) means
all consumers in the UK will have access to a landline service should they choose to
do so. 
Mr Frederick Horner advised that communication providers must not undertake any
non-voluntary migration until they have confidence and that they are taking all
possible steps to protect vulnerable people throughout the migration process, adding
that there have been 4 groups categorised as vulnerable, which are people with
visual impairments, hearing impairments, registered disabled or a telecare user. Mr
Frederick Horner also advised that should people be categorised as vulnerable then
they should contact their provider to advise them of this. 
It was highlighted that BT are allowing people to retain the same number and
providing it for the same cost and for most customers the switch over would be as
simple as connecting their phone handset to a router rather than a phone socket on
the wall and that customers who don’t have or want broadband will be moved to a
new ‘dedicated landline service’. 
The Group highlighted there concern in relation to the PSTN switch off, particularly
for Island users. Mr MacInnes advised that battery back-up units would be provided
for those considered ‘vulnerable’ in areas with limited signal and that further
mitigation would be explored. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the information
provided. 
(Reference: Presentation by Strategic Transportation Policy Officer and Digital and
Projects Support Officer, Argyll and Bute Council) 
9. PARTNERS UPDATE 
(a) Police Scotland Update 
Consideration was given to a report from Police Scotland which provided
information on the ongoing work of the Service and information on areas
including serious and organised crime; acquisitive crime, including fraud;
road safety and road crime; violent crime; public protection. The report
also provided information on the appointment of a new Area Commander
and the results of a Road Policing Safety Day of Action on 22nd August,
which took place in Taynuilt. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Police Scotland, submitted) 
Page 9

Page 10

(b) Scottish Fire and Rescue Update 
The Group gave consideration to a report highlighting the Scottish Fire
and Rescue Service’s (SFRS) FQ2 review of local performance across
Oban, Lorn and the Isles for the period 2024-25. The report included
information on the local firefighter training plan; incidents during this
period; unwanted fire alarm signals; road and water safety campaigns;
community engagement activities; East and West Dunbartonshire and
Argyll and Bute Local Senior Officer Activities; and home fire safety. 
Robert Taylor advised that the uptake of Home Fire Risk Assessments
with the Oban, Lorn and the Isles was low and invited Partners to 
encourage service users to request a risk assessment be undertaken
within their homes. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Scottish Fire and Rescue Service, submitted) 
(c) Living Well Network Update 
The Group considered the report which highlighted a list of Third Sector
Groups and Support Groups contact details, who work within the Oban,
Lorn and the Isles Area. The Living Well Network Co-Ordinator invited
partners to share this list with their service users to enable this information
to reach as many people in the communities, as possible. 
Decision 
The Oban, Lorn and the Isles noted the information provided. 
(Reference: Report by Living Well Network, submitted) 
(d) Argyll and Bute Third Sector Interface Update 
Consideration was given to an update from Argyll and Bute TSI. The
update provided information on policy activity; local strategic partnerships;
Community Wealth Building progress; Internal matters, contracts, sector
support and strategic action plan delivery; the Communities Mental Health
and Wellbeing Fund Year 4 grant; the continued support given to the
Argyll and Bute Climate Action Network and the work of the Wellbeing
Development Manager. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Argyll and Bute TSI, submitted) 
Page 10

Page 11

(e) Transport Scotland Update 
The Group gave consideration to an update highlighting the improvement
works and maintenance undertaken by Transport Scotland within the
locality. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Transport Scotland, submitted) 
(f) Opportunity for Verbal Updates 
Hope Kitchen 
Catriona Petit advised the Group that Hope Kitchen in partnership with
other charities had won the Scottish Power Innovation Award in respect of
the Re-Store shop that opened Oban.  This is a national award with many
other nominees, so it was a wonderful achievement to be recognised. 
Committee Manager Update 
The Committee Manager highlighted that the Governance Arrangements
of the Group would be considered at the next meeting, including the
membership, advising that the Membership is drawn from public sector,
third sector, private sector, community organisations and partnerships
operating within the Oban, Lorn and the Isles area. Stuart encouraged
partners to refer any individuals or groups who may be interested to
contact him regarding their inclusion within the membership. 
Stuart also advised on the availability of The John of Lorn Bequest and
Coals for the Poor, Oban which are open to residents of Oban with
successful individual applicants receiving £50, while those that are
applying on behalf of their family receiving £100. Stuart added that
applications would only be considered if applicants are in receipt of a
qualifying benefit and that applications are evaluated quarterly. 
10. THE POVERTY ALLIANCE - TAKING ACTION ON RURAL POVERTY 
Consideration was given to a presentation from Becky Hothersall from The Poverty
Alliance on their Taking Action on Rural Poverty project. It was highlighted that the 3-
year project is taking a collaborative approach to develop new ways of addressing
the rural cost of living in Argyll and Bute and Aberdeenshire, as income based
measures do not take account of the higher cost of living in rural and Island
Scotland, which is between 15% to 30% higher than urban areas of the UK. Becky
advised that the Alliance aims to develop practical, local measures aimed at
reducing the rural premium. 
The presentation also provided information on the ongoing work of the Alliance
which included establishing a citizen’s panel of 13 people from across Argyll and
Page 11

Page 12

Bute and associated next steps; support offered to rural organisations and how to
join them and be part of Scotland’s anti-poverty movement. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the information
provided. 
(Reference: Presentation by Development Officer, The Poverty Alliance, submitted) 
11. CLIMATE CHANGE 
(a) Argyll and Bute Climate Action: developing a Climate Change
Strategy and Action Plan for Argyll and Bute 
Consideration was given to a report providing an update on the
Community Planning Partnership’s Argyll and Bute Climate Action Project:
Developing a Climate Change Strategy and Action Plan for Argyll and
Bute. It was noted that the Project Manager was seeking feedback from
Partners on the draft Strategy and Action Plan, prior to submitting a
finalised version to the upcoming Community Planning Partnership
Management Committee meeting in December 2024. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group: 
1. noted the approach and status of the project outlined in the report; and 
2. agreed to provide comments and feedback to the Project Manager
(andy@act-now.org.uk) following the meeting. 
(Reference: Report by Climate Change Project Manager, Argyll & the
Isles Coast and Countryside Trust, dated 28 October 2024, submitted) 
(b) Opportunity for Verbal Updates on Community Based Initiatives 
Oban Flooding 
Duncan Martin, Oban Community Council, raised concerns over the
increase of severe weather caused by Climate Change specifically
flooding. The Committee Manager referred Mr Martin to a report
considered by the Environment, Development and Infrastructure
Committee in June 2024 that proposed all funding opportunities be
explored including lobbying the Scottish Government to seek to secure
funding to implement flood prevention works in Oban. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group agreed to
request that the Infrastructure Design Manager, Argyll and Bute Council,
attend a future meeting to offer an update on short, medium and long term
Page 12

Page 13

flooding mitigation measures. 
Scottish Fire and Rescue Service 
Robert Taylor, Scottish Fire and Rescue, advised that the Service is
responding to increased number of climate change related emergencies
such as wildfires and flooding. To help the Service respond to such
emergencies new equipment has been purchased. 
Climate Café 
Catriona Petit, Hope Kitchen, advised that the Oban Climate Café meets
each month in St Johns Church or Hope Kitchen and encouraged all
interested Partners to contact her for further details. 
12. DATE OF NEXT MEETING 
The Group noted that the next meeting of the Oban, Lorn and the Isles Area
Community Planning Group would take place on the afternoon of Wednesday 12
February 2025 on Micro-Soft Teams and in the McCaig Suite, Corran Halls, Oban. 
Page 13

Page 14

This page is intentionally left blank

Page 15

Argyll and Bute Community Planning
Partnership 
Oban, Lorn and the Isles Area Community
Planning Group 
12 February 2025 
Area Community Planning Group Governance Arrangements 
Summary 
The report asks the Oban, Lorn and the Isles Area Community Planning
Group to review the current Terms of Reference, the membership of the
Group and also asks members to note the dates for meetings up until May
2026. 
1. Purpose 
1.1 The purpose of this report is to confirm the governance
arrangements of the Oban, Lorn and the Isles (Area CPG)
specifically the Terms of Reference, membership and note future
meeting dates. 
2. Recommendations   
2.1  Area CPG members are requested to:  
• Consider and adopt the Terms of Reference submitted in this
report (Appendix 1) and to agree that these be reviewed on an
annual basis to ensure their ongoing currency and
appropriateness for the work of the Area CPG as it develops
over time. 
• Consider and agree the membership of the group as attached
(Appendix 2) and to agree that the membership of the group be
reviewed on an annual basis to ensure currency and
appropriateness for the work of the group as it develops over
time. 
• To note the future meeting dates submitted in this report. 
3.        Detail 
Page 15 Agenda Item 4

Page 16

3.1 The Area CPG Terms of Reference were last reviewed and agreed
in February 2024. An updated version, which has been amended to
reflect some changes in language and terminology, is attached at
Appendix 1. 
3.2 The membership of the Area CPG was last reviewed in February
2024. The Area CPG are asked to consider whether any changes
should be made to the membership, details of which are attached at
Appendix 2. 
3.3 The membership will be reviewed on an annual basis to ensure
currency and appropriateness for the work of the group as it
develops over time, however there is provision for additional
organisations to join the group at any stage to accommodate local
circumstances. 
3.4 Historically meeting dates for Area Community Planning Groups are
scheduled approximately half way between the programmed
meetings of the Community Planning Partnership Management
Committees to enable effective and timeous reporting of matters to
that committee. Members are therefore asked to note that the
meeting dates for the Oban, Lorn and the Isles Area CPG for
2025/26 will be:- 
• Wednesday 14 May 2025
• Wednesday 13 August 2025
• Wednesday 12 November 2025
• Wednesday 11 February 2026
• Wednesday 13 May 2026 
4. Conclusion 
4.1 Given the development of Local Action Plans and the future focus of
the work of Area Community Planning Groups the meeting is asked
to review and agree the attached Terms of Reference and the
current membership. 
5.  SOA Outcomes 
Not applicable. The report relates to the administration of the Area CPG. 
For further information please contact:   
Stuart McLean, Committee Manager, Argyll and Bute Council
Tel 01436 658 717 
Appendix 1 – Terms of Reference
Appendix 2 – Membership list 
Page 16

Page 17

Terms of Reference Version 1.8 February 24 Page 1 
Argyll and Bute Community Planning Partnership 
Terms of Reference: Oban, Lorn & the Isles Area Community Planning Group 
The Oban, Lorn & the Isles Area Community Planning Group is a sub group of, and report to, the Argyll
and Bute Community Planning Partnership’s Management Committee. 
It is an unincorporated partnership of agencies and organisations with membership drawn from the
public sector, third sector, private sector, community organisations and partnerships that have an
interest in Oban, Lorn & the Isles. 
Purpose 
Argyll and Bute is a large and diverse area.  Communities inevitably have different issues even within
the overall umbrella of a community plan for the whole area. 
Area Community Planning Groups are the vehicle to ensure that there is effective community planning
delivery, as set out in the Community Empowerment (Scotland) Act 2015, at a local level by: 
• Contributing to the oversight role of the whole partnership by highlighting issues of a
partnership nature that cannot be resolved locally through the Area Community Planning
Group, to the Community Planning Partnership Management Committee. 
• Acting on behalf of the Community Planning Partnership via its Management Committee
to oversee the implementation of Area Community Planning Action Plans (known as
‘locality plans’ within the Community Empowerment (Scotland) Act 2015) 
• Acting on behalf of the community to ensure that local concerns and priorities are
highlighted to the Community Planning Partnership’s Management Committee. 
Role 
The role of the Oban, Lorn & the Isles Area Community Planning Group is to: 
• Oversee the development and implementation of the Area Community Planning Action
Plan for Oban, Lorn & the Isles
• Encourage effective working across community planning partners at an area level
• Act as a conduit to ensure that local priorities are met and local issues addressed
through partnership working 
Remit 
The Oban, Lorn & the Isles Area Community Planning Group has the authority to: 
• Contribute to the development of an Area Community Planning Action Plan for Oban,
Lorn & the Isles.
• Monitor progress of the Area Community Planning Action Plan for Oban, Lorn & the
Isles.
Page 17

Page 18

Terms of Reference Version 1.8 February 24 Page 2 
• Provide the scrutiny role for the Community Planning Partnership within Oban, Lorn &
the Isles considering regular performance monitoring reports and providing information
to the Management Committee by submitting written reports on challenges that cannot
be resolved locally; where these challenges relate to partnership working and not single
agencies.  A representative of a community group or statutory body or business that is
not a member of the group may also attend a meeting with prior agreement from the
Chair to provide additional information should a specific issue of concern to the group
be scheduled as an agenda item 
• Form short term working groups to undertake defined pieces of work as required by the
group
• Engage with communities within Oban, Lorn & the Isles to understand their needs.
• Inform and consult on issues relating to Community Planning at an area level
• Contribute to a Community Planning annual report for Argyll and Bute on progress on
the agreed outcomes and best practice in partnership working.
Short Term Working Groups 
Short Term Working Groups initiated by the Oban, Lorn & the Isles Area Community Planning Group
must: 
• Be approved at a meeting of the Oban, Lorn & the Isles Area Community Planning
Group and its purpose recorded in the minute of the meeting , with clarity on the
objective and output of the group and the start and end date of the work. 
• Have a named member of the Oban, Lorn & the Isles Area Community Planning Group
acting as lead officer for the group
• Have a list of members of the group agreed at inception
• Have an appropriate source of administrative support identified and agreed at inception
• Where relevant have an appropriate funding package identified at inception and a
named member of the short term working group undertaking financial responsibility for
the initiative 
• Provide regular reports of activity and progress  to the Oban, Lorn & the Isles Area
Community Planning Group; and in updates to the Management Committee
• Any changes to the above must be approved by the Oban, Lorn & the Isles Area Community
Planning Group and recorded in the minute of the meeting
Equal Opportunities and Fairer Scotland Duty 
The Oban, Lorn & the Isles Area Community Planning Group will ensure that equal opportunities are
considered in each of their remitted activities, any expected negative impacts are mitigated and
promotion of equal opportunities is central to its ongoing activities. 
In doing so the Oban, Lorn & the Isles Area Community Planning Group will consider the
responsibilities placed on it by The Fairer Scotland Duty.  This duty places a legal responsibility on
particular public bodies in Scotland to pay due regard to (actively consider) how they can reduce
inequalities of outcome, caused by socio-economic disadvantage, when making strategic decisions. 
Criteria for Membership 
Page 18

Page 19

Terms of Reference Version 1.8 February 24 Page 3 
• Membership is drawn from public sector, third sector, private sector, community
organisations and partnerships operating within the Oban, Lorn & the Isles area.
• Membership is open to all public sector, third sector, private sector, community
organisations and partnerships operating within the Oban, Lorn & the Isles area with an
interest in at least one of the outcomes identified in the Outcomes Improvement Plan.
• Organisations can self-nominate, be invited to join or have a statutory obligation to
participate. 
• In order to ensure democratic accountability, the Chair and Vice Chair from the Argyll
and Bute Council Oban, Lorn & the Isles Area Committee and one other Elected
Member from an Argyll and Bute Council Oban, Lorn & the Isles Area Committee Ward
not already represented by the Chair or Vice Chair will sit as members of the group. 
• In order to ensure democratic accountability, community councils situated with in the
Oban, Lorn & the Isles area will sit as a member of the group. Subject to local needs,
this may be individual community councils, or by way of a caucus arrangement agreed
by the community councils situated within the Oban, Lorn & the Isles area, or
alternatively one community council representing all of the community councils on a
rotational basis. The community council undertaking this role will be nominated by the
other community councils within the area on an annual basis or more frequently if
agreed locally.
• In order to comply with legislation which governs community planning in Scotland, some
organisations have a statutory obligation to participate in community planning. The
organisation will nominate the most appropriate person within their organisation to sit
as a member of the group where relevant.
• In order to reflect the needs of the community and range of activities covered by the Area
Community Planning Action Plan, other organisations and partnerships operating within
the local area are also able to sit as members of the group.
• In order to obtain a balanced representation of the above and to ensure a community
focussed approach, a ratio of no more than 50% public sector membership should be
maintained throughout the lifetime of the group. 
• The representatives ought to be able to speak on behalf of their organisation and where
appropriate commit funding and other resources to local partnership activity.
Membership should reflect the needs of the community and can therefore change
subject to approval by a simple majority vote of the other members of the group.
Role of Members 
Oban, Lorn & the Isles Area Community Planning Group members have the following responsibilities: 
• To consistently attend the scheduled Oban, Lorn & the Isles Area Community Planning
Group meetings. (Consistency in attendance by members is necessary to build
momentum and progress the activities of the group)
• Appoint a substitute to attend meetings on their behalf if they are unable to attend. 
• To communicate information relating to the Oban, Lorn & the Isles Area Community
Planning Group with other members and officers within their own organisation and
other organisations operating within the area of activity they represent.
• To communicate information relating to their organisations area of activity to other
members of the Oban, Lorn & the Isles Area Community Planning Group at meetings.
Page 19

Page 20

Terms of Reference Version 1.8 February 24 Page 4 
• To raise community planning related issues (that is issues related to Argyll and Bute
Community Planning Partnership’s Local Outcomes Improvement Plan) on behalf of the
community at Oban, Lorn & the Isles Area Community Planning Group meetings.
• To contribute to the development, ongoing monitoring and review of the Oban, Lorn &
the Isles Area Community Planning Action Plan.
• To participate in short term working groups as required. 
Meetings 
Chair 
• The Chair and Vice Chair of the Oban, Lorn & the Isles Area Community Planning Group
will be elected by the members of the group and will be appointed for a period of two
years.
• The outgoing Chair and Vice Chair can stand for re-election at the end of the two year
period. 
• However, no one person can serve in the role of Chair or Vice Chair for more than two
consecutive two year periods
• Should either the Chair or Vice Chair resign their position during their term of office, the 
office bearer must either notify the group in person at a scheduled Area Community
Planning Group meeting or contact  the Chair in writing  advising formally  of their
intention to stand down. Members will be advised of the resignation timeously and an
election to fill the vacant post will be conducted at the next scheduled Area Community
Planning Group meeting
• Nominations for the Chair and Vice Chair positions will be proposed and seconded by
Oban, Lorn & the Isles Area Community Planning Group members.  Each member will
have one vote and a simple majority vote will determine the outcome of the election
process.
• The elected Chair, or in their absence, the Vice-Chair shall preside over the meeting. If
both are absent, partners will choose a member from the floor to preside.
• Members should respect the authority of the Chair who will decide matters of order,
competency, relevancy and urgency.
Quorum 
• The quorum for a meeting will be 5.
• If a quorum is not present within 10 minutes of the scheduled start of a meeting or if at
any point after a meeting has commenced attendance falls below the quorum the
meeting will be declared inquorate.
• If a quorum is not present, at the Chairperson’s / Vice-Chairperson’s discretion, the
meeting shall proceed and any decisions taken will be homologated at the next meeting.
• For purposes of the quorum, participation of partners by video-conferencing or
telephone conference links will be considered as present. 
Frequency of Meetings 
• The Area Community Planning Groups of the CPP will normally meet once each quarter
(4 times each year)
• These meetings will normally be held in February, May, August and November. 
Page 20

Page 21

Terms of Reference Version 1.8 February 24 Page 5 
• Where business requires, further meetings can be called with agreement of the Chair
subject to the required notice being given. 
Conduct of Meetings 
• Meetings of the Oban, Lorn & the Isles Area Community Planning Group will be held in
public. 
• Observers can only participate in discussion with the agreement of Chair.
• Members must declare any conflict of interests at the start of a meeting and take no
part in the consideration of the relevant item.
• Observers wishing to participate in discussion must declare any interest in the subject
under discussion.
• All meetings will be minuted and a minute made available through the Council’s website
and available from a link through the Community Planning Partnership website.
• Meetings of the Area Community Planning Groups will be conducted in accordance with
the lead partner‘s (Argyll and Bute Council) standing orders for meetings subject to any
necessary changes as set out above (mutatis mutandis) 
Decision making 
• All members of the group have equal status 
• Each member has one vote 
• The Chair retains the casting vote
• All decisions must be clearly minuted with a brief summary of the discussion  and reason
for decision recorded as well  as the outcome
• The minutes should clearly record who or whatever organisation is responsible for
action
• Observers and persons attending the meeting  in an advisory capacity may provide
information but are not part of the decision making process and are not able to
participate in a vote
Accountability 
The Oban, Lorn & the Isles Area Community Planning Group is an integral part of community
planning in Argyll and Bute and is accountable to the following bodies: 
• Full Community Planning Partnership via the Management Committee 
• Community within its local area 
Support 
The Oban, Lorn & the Isles Area Community Planning Group will be supported by: 
• A Lead Officer to facilitate and promote the smooth operation of the group and work
closely with group members to ensure a supportive structure, which responds to the
needs of the members in addressing issues.
• Administrative support, organising meetings, taking minutes and associated
administrative support will be provided by Argyll and Bute Council, Governance & Law.
• A Local Community Development Officer will have a key role, working in partnership
with organisations in the support of community groups, organisations and individuals,
Page 21

Page 22

Terms of Reference Version 1.8 February 24 Page 6 
particularly those who do not traditionally engage in community issues, to participate in
local community planning. 
Issue of Papers 
• The agenda and papers for the Oban, Lorn & the Isles Area Community Planning Group
will normally be issued 7 days prior to the date of the meeting. 
• The Chair can agree to accept late papers. 
• The draft agenda detail will normally be circulated four weeks in advance to allow
members to propose items for inclusion 
• The agenda and papers will be available via the Argyll and Bute Community Planning
Partnership website and will be published on the Argyll and Bute Council website. 
Communications 
The Oban, Lorn & the Isles Area Community Planning Group is encouraged to share any best
practice in partnership working locally with the wider Community Planning Partnership.  Case
studies and examples of partnership working making a difference can be sent to
cppadmin@argyll-bute.gov.uk to be shared and promoted. For example this may be through the
regular CPP e-Bulletin.  The CPP e-Bulletin is available to members of the Area Community
Planning Groups and sign up is via cppadmin@argyll-bute.gov.uk. Paper copies can be made
available and are downloadable from the webpage. 
Winding Up 
The Oban, Lorn & the Isles Area Community Planning Group is a sub group of the Argyll and Bute
Community Planning Partnership. 
• If the Argyll and Bute Community Partnership is dissolved, the Oban, Lorn & the Isles
Area Community Planning Group will cease to exist by default
• If a review of Argyll and Bute Community Planning Partnership delivery structure should
recommend that Area Community Planning Groups should be dissolved to facilitate a
new delivery structure, the decision whether or not to wind up the group will be made
by the Argyll and Bute Community Planning Partnership following consultation with the
Area Community Planning Groups and Argyll and Bute Council as lead partner for
community planning within the area.
• Area Community Planning Group members may initiate a proposed wind up of the group
by submitting a report outlining the reasons why it was felt the group was no longer
required to the Management Committee in the first instance. The decision whether or
not to wind up the group will be made by the Argyll and Bute Community Planning
Partnership following consultation  with Argyll and Bute Council as lead partner for
community planning within the area 
Approved and adopted at the Oban, Lorn & the Isles Area Community Planning Group meeting held
on 11 March 2015 
Amended March 2015 to reflect a change in the meeting cycle
Amended March 2016 to clarify procedure if either the Chair or Vice Chair resigns during their term
of office and amend number of days meeting papers are to be circulated prior to meeting date
Page 22

Page 23

Terms of Reference Version 1.8 February 24 Page 7 
Amended February 2017 to clarify procedure if outgoing office bearer wishes to stand for re-
election.
Amended February 2019 to clarify terms in respect of the Local Outcome Improvement Plan / Area
Community Planning Action Plan.
Amended February 2021 to clarify language and terminology and to include reference to Fairer
Scotland Duty.
Amended February 2022 to clarify language and terminology.
Amended February 2023 to clarify language and terminology.
Amended February 2024 to clarify language and terminology, and to update the default media for
the CPP e-bulletin.
February 2025 no changes recorded. 
Page 23

Page 24

This page is intentionally left blank

Page 25

Appendix 2
Oban, Lorn and the Isles Area Community Planning Groups Membership (incorporating changes in local
communities since February 2024).
Organisation Name
Argyll and Bute Council  Cllr J McKenzie 
Cllr K Green
Community Councils Mull
Iona
Coll
Tiree
Oban
Glenorchy & Innishail
Taynuilt
Avich & Kilchrenan
Luing
Kilninver & Kilmelford
Seil & Easdale
Kilmore & Kilbride
Dunbeg
Lismore
Appin
Connel
Ardchattan
Police Scotland   Chief Inspector Simon Shanks
Inspector Matthew Shaw   
Scottish Fire and Rescue  John Sweeney
Health & Social Care Partnership (OLI) Morven Gemmill
ACHA Michelle Mundie
West Highland Housing Association  Brett Sadler
Highlands & Islands Enterprise Catriona McKnight/Morag Goodfellow
Argyll and Bute Third Sector Interface Kirsteen  Murray/Katrina Sayer
Living Well Networks Carol Flett
BIDS4Oban Andrew Spence
Yvonne MacLean
Scottish Federation for Small Businesses Janet Waterworth
Argyll & Isles Strategic Tourism Partnership Carron Tobin 
Argyll College Theresa Bain (Developing the Young Workforce)
Cal Mac 
Development Coll 
Hope Kitchen Catriona Petit
Disability Forum & Access Panel Ken Johnson
Oban Tourism Linda Battison
Tiree Trust 
Crossroads Joan Best
North Argyll Carers  Joan Best
Oban Youth Forum Maureen Evans
Oban Youth Cafe Jacqui Buchanan
Oban Communities Trust/Rockfield Eleanor McKinnon
TSI Petra Pearce
Oban High School  Aileen Jackson
Skills Development Scotland Susan MacRae 
OCHDA Robert Kincaid
Dunbeg Woodlands Group Laura Corbe
Page 25

Page 26

MECOPP Carers Centre Ali Martin
Carr Gomm Becs Barker & Sarah Chapman
Time for Change Angela Anderson
Isle of Luing Community Trust Colin Buchanan
John Murray West Coast Motors
Argyll and Bute Climate Action Network (ABCAN) Andy MacPherson
Family Mediation Argyll and Bute Tanya MacDougall
Oban High School Pupil Parliament 
Lucy Sumsion National Farmers Union 
Page 26

Page 27

Argyll and Bute Community Planning
Partnership 
Oban, Lorn and the Isles
Area Community Planning Group 
12 February 2025 
Community Planning Partnership Management Committee Meeting 
This briefing relates to the meeting of the Community Planning Partnership (CPP)
Management Committee meeting which was held on 6 December 2024. The briefing
is for noting and relevant discussion. 
Summary 
HIGHLIGHTS 
Area Community Planning Group (ACPG) Updates 
Stuart McLean, Argyll and Bute Council, provided an overview of the ACPG reports
from the meetings held in April/May, August and November. 
Stuart thanked the new office bearers that have taken up appointments – Gill
Simpson as Vice Chair of Helensburgh and Lomond ACPG, Colin Buchanan as
Chair and Julie MacKenzie as Vice Chair of Oban, Lorn and the Isles ACPG and
Anne Horn as Chair of Mid-Argyll, Kintyre and the Islands ACPG. 
Stuart also raised the concerns of the Mid Argyll, Kintyre and the Islands ACPG
regarding the negative impacts to local people and businesses due to repeated
closures of the A83. Stuart advised that Iain Woodcock, Transport Scotland, had
attended the Bute and Cowal, Mid Argyll, Kintyre and the Islands and Helensburgh
and Lomond ACPGs to give updates on the ongoing traffic management
arrangements on the A83 and improvements to the Old Military Road. 
The Management Committee noted the concerns raised by the Mid Argyll, Kintyre
and the Islands ACPG and hoped that any further frustrations would be alleviated by
the details provided by Mr Woodcock.
The Management Committee met on the 6 December 2024 via Microsoft
Teams. This update provides an overview of the discussion which took place. 
Reports which were discussed at the meeting can be found by following this
link - Agenda for Argyll and Bute Community Planning Partnership -
Management Committee on Friday, 6 December 2024, 10:00 am - Argyll and
Bute Council
Page 27 Agenda Item 5

Page 28

Census / Population Update 
David Murdoch, Argyll and Bute Council, delivered a presentation on the work on the
population and census data from the census / National Records of Scotland (NRS). 
The Management Committee noted that the population in Argyll and Bute had been
gradually declining since 1989 (93,990 people), post-COVID saw a positive trend
increasing the net inward migration to the area (however it is too early to forecast if
this increase will continue in an upwards trend in the future). 
David explained how the difference in population estimates from 2011 and 2022
were largely due to changes in how the naval personnel at HMNB Clyde were
included, or not, in the 2011 and 2022 census figures respectively. David highlighted
that the population in HMNB Clyde is properly accounted as it does impact the area
in terms of services being used by the naval personnel – schools, health services
etc. 
David said that in 2043 the projected population in Argyll and Bute would be 73,500
people. The projections also showed an increase to the average population age (46
– 76 years) and the mortality rates of that aging cohort have been reflected in those
figures. The age of the working age population is also declining in all four
administrative areas. 
David noted the variance by area of the population under 16, and how the rate of
child poverty in Argyll and Bute is 19.4% which is more positive that the Scotland
average of 21.8%. However, there are areas in Argyll and Bute were the proportion
of children in low income families is higher that the Scottish average, such as
Rothesay. 
Joint Strategic Needs Assessment (JSNA) 2024 Presentation 
Saskia Schmitz, NHS Highland, delivered a presentation on the JSNA which detailed
the expected future needs of the local population. 
Included in the presentation was detail on the ageing population in Argyll and Bute,
specifically that 27.8% of people over 65 are affected by multiple health conditions.
The most common health concerns are cancer, arthritis, coronary heart disease,
asthma and diabetes. This will likely lead to a rise in care needs of increasing
complexity. The rate of Adult Care home residence in Argyll and Bute is higher than
the Scottish average. The highest prevalence condition for those in long-term
residential care is dementia and there is an increase in the number of deaths in a
homely setting due to dementia. 
Saskia noted it is difficult to accurately record the number of unpaid carers in Argyll
and Bute as not all are registered with carer centres, although recent awareness
raising campaigns have shown an uptake in the number of people registering.
Currently most unpaid carers are in the age group 35 years and over, although a
Page 28

Page 29

quarter of all carers are aged 65 and over, showing there may also be a need to
provide more support to unpaid carers in the future to support the aging population.   
Argyll and Bute Council was one of the first to declare a housing emergency. The
high cost of homes means only 25% of the population can afford housing here
(based on the standard affordable housing ratio of 3.5 x household income). There is
a high amount of second homes and ineffective housing stock and the pressure on
the market for available homes is highest on our island communities. For social
housing, every available property has at least four applicants. Homelessness was
reducing, however it has been rising again and may put increasing pressure on our
housing / homeless services. 
CPP Climate Change Strategy and Action Plan 
Andy Macpherson, Argyll & the Isles Coast & Countryside Trust, pointed to the
extensive information available in the meeting pack (link provided above) and gave
an overview of where the work is on the strategy, priorities and next steps. The
Climate Strategy is broad ranging, including mitigation and adaptation and that is
approach sits efficiently with how the Scottish Government is looking to distribute
climate change funding. The strategy has been streamlined, and Andy is continuing
to work on making the document shorter and simpler. 
CPP Community Wealth Building (CWB) Short Life Steering Group   
Takki Sulaiman, Argyll and Bute TSI, presented a recap on the five pillars of CWB
and the actions to date. Takki advised that there had been good discussions on
CWB at the eight ACPG meetings in April/May and August, and it was discussed at
the September CPP Full Partnership. A shared ownership informal best practice
group has met 4 times to look at the mechanics of how his could look in terms of
community energy / renewable energy schemes. The Council procurement team has
also provided excellent information and they are producing a new procurement
strategy in early 2025. Good news is that currently 38% of council spend is local,
compared to the 28% national average. 
In February 2025 the CWB Steering Group will host an in-person workshop to
produce a summary position statement with a “hyper localised” vision and mission.
The group will prioritise recommendations and deliver action plans and explore
linkages and opportunities with other strategies. An infographic will be produced to
explain how CWB fits with other activities and highlight what role partners can play in
the delivery of CWB. 
Takki advised that the Economic Development Association Scotland have received
funding to set up a CWB best practice hub, and an online CWB tool has been set up
by the Improvement Service. 
Argyll and Bute Council Equalities Outcomes Consultation 
Chris Carr, Argyll and Bute Council, delivered a presentation on the consultation
which applies to the Council, Education and licensing board. The consultation is
Page 29

Page 30

looking to change all the equality outcomes, applying lessons learned from previous
outcomes, and apply actions to the new outcomes to facilitate progress reporting. 
The new outcomes are due to be published at the end of April 2025, and there is a
need to consult with relevant groups to develop the outcomes. Chris encouraged
partners to promote the consultation to community groups, noting how inclusion and
equalities are woven into the Local Outcome Improvement Plan – most closely to the
Community Wellbeing priority. 
The next steps are a public consultation, which will run over the festive period. The
responses will then be analysed and amendments made to the outcomes and
actions plan as required. 
Audit Scotland’s Tackling Digital Exclusion Report 
David Murdoch, Argyll and Bute Council, spoke to the Audit Scotland Report, which
was published in August 2024. The aim of the report was to consider how public
bodies, including Scottish Government, Councils, NHS and other bodies, understand
and are tackling digital exclusion. The report looks at what digital inclusion is, how
well the public sector are tackling this issue and how to support improvement to
enable digital inclusion. 
A key message in the report is that digital technologies can bring many benefits and
efficiencies, enable people to access services and is an important factor in ongoing
public sector reform. Audit Scotland spoke to those with real life experience of digital
exclusion and this provided real value to the report. Connecting Scotland has
supported over 61,000 households to get online, however this funding has been
reduced after the pandemic so collaborative working across organisations is needed
to continue this work. Skills development is also needed, with around 15% of
Scotland’s adults lacking digital skills. 
For further information, please contact: 
Stuart McLean, Committee Manager, Argyll and Bute Council (01436) 657605
Stuart.mclean@argyll-bute.gov.uk 
Page 30

Page 31

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Aspiring Places;
Community Projects in
Argyll and Bute
Community Planning Partnership Groups FQ4 2024/25
Lucy Dunbar – Project Officer
Milly Leggett – Project Officer
Stuart Green – Project Manager
Page 31
Agenda Item
6

Page 32

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Previous project approach - Area Plans
 Council Agreed Priorities – November 2022
 Corporate Plan 2023 - 2027;
 Agreed by Policy and Resources Committee – October 2023
 Number of locality plans - 8
 Purpose & Principles
 Approach - 3 phases
 Resourcing and timescales
 In addition; agreed to reflect any relevant outcomes from the Community
Planning Partnership Community Wealth Building Review relevant to the
Council in the approach to producing area plans.
Page 32

Page 33

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Project review
April – September 2024
 April 2024 – Project officers appointed.
 April 2024 - Change of Administration.
 CEO request for pause and review of project.
 ELT appointed as project board.
Page 33

Page 34

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Council Agreed Priorities 2024 – 2027
New priorities agreed September 2024
 Includes implementation of Aspiring
Places; Community Projects in Argyll
and Bute.
Page 34

Page 35

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Council Decision – September 2024
Council agreed to;
1. Rename the initiative as ‘Aspiring Places: Community Projects in Argyll and Bute.
2. Adopt Consul Democracy (a digital tool for citizen participation)
3. Engage with all community groups over the same period of time rather than a
phased approach on an area basis;
4. Provide guidance to inform community groups of potential funding opportunities.
5. No longer create the publication of 8 ‘Area Plan’ documents and subject to a trial
period, alternatively report to members on;
a) the outcomes of the initiative through a formal evaluation and
b) future recommendations on the long term viability and retention of the Aspiring
Places – Community Projects in Argyll and Bute initiative.
Page 35

Page 36

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Revised Project Vision
To create in one place, a comprehensive picture of all
community projects to increase the likelihood of
collaboration, securing external funding and
implementation of projects in a planned approach to
place.
Page 36

Page 37

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Aspiring Places: One Digital Space for
Community Projects in Argyll and Bute
 Single engagement phase using an existing and established community a digital tool
for citizen participation, CONSUL Democracy .
 An intuitive and easy to use platform designed for communities to create and share
their proposals. 
 A tried and tested platform used by 23 Scottish Local Authorities.
 Pioneered in Argyll and Bute by Community Development team as part of emergency
COVID 19 response, Building Back Better initiative.
 Currently funded by Scottish Government and supported by COSLA.
 Open access.
Page 37

Page 38

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Project Scope
Aspiring Places will be... Aspiring Places will not...
A place to help raise awareness of the range of projects
community groups and organisations would like to or are
planning to carry out
Directly administer funding for projects.
However, it will provide signposting to existing information
about funding opportunities.
One single place that community groups, council officers
and elected members can go to, to be able to gain
knowledge of all the potential and existing projects within
an area.
Directly support groups to develop projects and/or create
business plans.
However, it will include signposting to self-help resources
A place for groups who want to carry out similar projects to
find each other
Be a delivery plan for the council or groups taking part
An information source that will help the Council link
community projects with funding opportunities when they
arise
Supersede Council plans and priorities
Page 38

Page 39

Bute • Helensburgh • Islay • Oban • Mull • Campbeltown • Iona • Dunoon • Tiree • Lochgilphead • Seil …
Classification: OFFICIAL
Next steps
 Pilot Online Platform (December 2024 – February 2025)
 Pilot with selected community groups
 Development of Support Resources
 Launch (March 2025)
 Evaluation (August to December 2025)
 Business Case for Future Retention of Site (January to April 2026)
Page 39

Page 40

This page is intentionally left blank

Page 41

ALIenergy – Report to OLI Area Community Planning Group – January 2025
Lynda Mitchell 
ALIenergy has a long history of working to alleviate fuel poverty in Argyll, 2025 being our
25th anniversary year. 
ALIenergy works to help people and the planet. Our activities include supporting local
sustainable energy initiatives, providing energy education in schools and communities,
and running our Affordable Warmth Service to combat fuel poverty. 
Current funders include Energy Redress Scheme, Argyll & Bute Council (various funds),
Robertson Trust, Bank of Scotland, Big Energy Saving Network, SGN Safe and Warm Fund,
Scottish Government (various funds), Centrica’s Energy for Tomorrow, ScottishPower
Renewables, SSE Renewables, Drax Foundation, Highlands and Islands Enterprise. 
Affordable Warmth Service
Our beneficiaries are vulnerable/disadvantaged for reasons such as low income, poor
health, disability, unemployment, single parenting and old age. We assist households
who cannot afford to heat their homes. They are living in cold, damp rooms. They
frequently must choose between eating and heating. Fuel poverty is associated with
multiple deprivations: poor physical and mental health, loneliness and isolation, poor
educational outcomes, low employability and debt, and ultimately, shockingly, loss of
life through excess winter deaths, due to cold and damp living conditions.
We provide intensive support to guide our most vulnerable households towards greater
energy security, often working with each client over a period of several weeks or
months, with multiple advice interventions. Our work consists of a combination of
home visits, telephone advice calls and associated follow-up work. The value of client
gain that we achieve, directly to the most vulnerable households in greatest need, is
well over one million pounds per year. This is a combination of immediate crisis
interventions and actions to increase resilience to fuel poverty into the future, including
accessing available heating and insulation grants, advising on energy saving
behaviours; helping to understand bills and meters, comparing and switching suppliers
and tariffs; assisting with complaints and metering / billing issues; helping people to
access fuel vouchers, free white goods,  debt relief and help with ongoing costs from
various sources. We also assist with referrals into the Scottish Government and UK
Government funded schemes for free home insulation and renewables, and we provide
free cosy kit items (blankets, thermal socks, hot water bottles). Winter is a very busy
time of year for our Affordable Warmth Team as people struggle with heating bills. There
is usually a waiting list for our advisors during the colder months.
Page 41 Agenda Item 7

Page 42

Storage Heaters
Across much of rural Scotland, mains gas is unavailable, and many households use
electric storage heaters, which can be difficult to control and expensive to run. The
exorbitant price of electricity compared to gas has meant that households using storage
heaters may have heating bills which are several times as high as those with gas - or
they may self-ration to use much less heat than people with gas. In Oban we are running
a pilot project with technical partner Connected Response to provide free smart
controls for storage heaters which can help to reduce energy consumption. 
Education
ALIenergy STEM Education Programme covers all of Argyll and Bute. This project
encourages and facilitates young people to seek careers in STEM subjects and the green
energy sector. We make first contact with young people during their transition from P7
into S1 and S2, with energy and climate change-related activities and workshops,
careers events, and stands for the whole community at summer events. 
Local Energy Developments
We are working with local communities and various renewable energy developers,
mostly around the Oban area, to explore the potential for community shared ownership
of potential wind farm developments. We held public meetings in Oban in February and
September 2024. An application to Scottish Government CARES fund to seek advice on
potential legal structures for shared ownership was successful. Shared ownership
could potentially create a long-term income stream for our communities which could
prove transformative, supporting a wide variety of activities and improvements. 
The Shop 
The Shop (Re_Store) in Oban was founded through a partnership of local charities:  Hope
Kitchen, ALIenergy, Oban Youth Café, Lorn & Oban Healthy Options and Atlantis Leisure.
The shop sells second hand and repurposed goods as well as redistributing surplus food
and running a variety of classes and events including arts, crafts, sewing and mending,
including making blankets and draught excluders to give out to those in need, and hosting
drop-in advice sessions. We are delighted that the venture is a great success and recently
won an Innovation Award at the ScottishPower Foundation Awards 2024.
Page 42

Page 43

TRANSPORT SCOTLAND UPDATE 
• A83 Rest & Be Thankful – continuing daily management of the traffic
management on this stretch of the A83 to ensure safe passing of the travelling
public with regular stakeholder updates advising of changes to the traffic
management. There is a final section of debris flow barrier still to be installed
at sectors 3a & 3b which is now planned for February, all of which is carried
out in full co-ordination with the ongoing ground investigation works which will
assist the design of the long term solution (Debris Flow Shelter).
• A828 Ledaig Rock Slope – The main works due to commence on 27th
January, which have been brought forward in response to the events of
November last year when there was a requirement to remove a sizable
boulder from the over hanging rock face – events are available on youtube.
The main works will take around 12 weeks and include de-vegetation, de-
scaling, removal of rock identified as a risk, installation of anchored support
mesh & drapery netting
• A85 Tyndrum to Dalmally Junction Signing – works are now substantially
completed.
• A85 Oban to Connel direction signs – There are 3 signs still to install which
should progress through February 2025 to completion. 
Page 43 Agenda Item 8a

Page 44

This page is intentionally left blank

Page 45

A85 A828 (OLI)
3 Month "Lookahead"
Programme
North West Bridges/Structures - Please note that none of these are confirmed and most are likely to change, potential dates only
Scheme Name/location Brief Description/TTM Proposed Start Proposed End
A85 670 W87 Esplanade Sea Wall Scour Repair Temporary traffic lights 01-Mar-25 31-Mar-25
A85 480 Orchy Drainage Improvement Temporary traffic lights 01-Apr-25 30-Apr-25
A828 50 Barcaldine Gardens Parapet Replacement Temporary traffic lights 01-Apr-25 30-Apr-25
Scheme Name Brief Description/TTM Proposed Start Proposed End
A85 Stronmilchan Junction Resurfacing (non-structural inlay/overlay) 05-Feb-25 06-Feb-25
A828 Ledaig (CS228_2022) Resurfacing (non-structural inlay/overlay) TBC TBC
A85 Loch Awe East Resurfacing (non-structural inlay/overlay) 09-Feb-25 15-Feb-25
A828 Beinn Sgluish Resurfacing (non-structural inlay/overlay) 19-Jan-25 05-Feb-25
A85 Dunollie Road (Oban) Resurfacing (non-structural inlay/overlay) 16-Mar-25 21-Mar-25
A85 West of Lix Toll Resurfacing (non-structural inlay/overlay) 31-Mar-25 06-Apr-25
A85 Cruachan Power Station Resurfacing (non-structural inlay/overlay) 03-Feb-25 05-Feb-25
A85 Loch Lubhair Resurfacing (non-structural inlay/overlay) 31-Mar-25 08-Apr-25
A828 South of Connel Bridge Resurfacing (non-structural inlay/overlay) 30-Mar-25 03-Apr-25
North West - Minor Improvement schemes, potential dates
Scheme Name Brief Description/TTM Proposed Start Proposed End
A83 OMR Medium Term Solution
Completion of Old Military road
Improvements, Glen Croe - No TM as off
A83 24-Feb-25 28-Feb-25
A83 RaBT Ph 3 A B Slip
Installation of debris flow barrier - TM
covered by Operational managemnt
above 10-Feb-25 10-Apr-25
North West Planned Maintenance - surfacing.  Again proposed dates
Version: 1.0 05/02/2025
Page 45

Page 46

This page is intentionally left blank

Page 47

A83 Rest and Thankful
Operational & Landslip Management
Page 47
Agenda Item
8b

Page 48

A83 Rest and Thankful
Hillside Monitoring Regime
Daily management of the route is continuing behind the scenes by our designated engineering team, to ensure it is safe for road users.
This includes:-
Daily
 Remote weather station monitoring
 Expert weather forecasting
 Ground saturation estimates
 Remote timelapse photography
 Daily decision-making on use of A83 or OMR
Weekly (depending on weather, more frequently)
 Site team observations on hillside condition and watercourse flows
 Hillside movement surveys & observations.
Traffic Management (varying levels of response)
 Traffic signals
 Convoy operation
 Old Military Road
 SIDR (A82/A85/A819)
Page 48

Page 49

A83 Rest and Thankful
Old Military Road (OMR) is
operational;
• A number of works completed (Phase 1 of
MTS) incl. road upgrades, drainage
improvements, extend HESCO barrier,
widening at bends
• Accessible for all forms of transport incl.
arctics
• Use of convoy traffic management
• Other works incl. new structure over Croe
Water & further road widening are still
required to ensure full resilience & protect
access to Argyle & Bute
Page 49

Page 50

A83 Rest and Thankful
Image from February 2024 Image from September 2024
Phase 3a & 3b, Retaining Wall;
• Significant failure above the retaining wall section, boulders onto A83
considered as the primary risk
• At that time, no landslide mitigation fences or pits in this local
• Temporary boulder fence provided (flat bed) & under traffic signal control
• Permanent additional debris fence being designed and procured
Phase 7;
• Significant landslip during
dry conditions,
unanticipated
• Failure witnessed during
normal procedures
• Successful use of debris
flow netting & catchpit area
• Resulting clearance works
completed successfully
Page 50

Page 51

A83 Rest and Thankful
QUESTIONS?
Page 51

Page 52

This page is intentionally left blank

Page 53

Classification: OFFICIAL
Argyll and Bute Community Planning
Partnership 
Oban, Lorn and the Isles Area Community
Planning Group 
12 February 2025 
Mainland Ferries Report 
Summary 
The report is for noting and provides an update following presentation of the
same report at the Environment, Development and Infrastructure meeting on
the 19th December 2024 
1. Purpose 
1.1 The report introduces members to the ‘Argyll & Bute Council
Mainland Ferries Study – Comparative Analysis of Options for
Council-run ferries’ carried out by Caledonian Economics
(Mainland Ferries Study) at Appendix 1. 
1.2 The anticipated Islands Connectivity Plan and Community Needs
Assessments being produced by Transport Scotland, excludes
local authority run ferries from proposals.  This study seeks to
address the gap left by this exclusion and looks at options for the
future of lifeline services to Easdale and Luing 
2. Recommendations   
2.1  Area CPG members are requested to:  
• Note the content of this report.
• Agree to receive further updates on progress of the next stage
of the study.
3.        Detail 
3.1 On 13 October 2022 Policy and Resources Committee agreed to
allocate £100k of Crown Estates Funds to a feasibility study and
specification work for pier infrastructure at Ellenabeich and Easdale
which would support the ongoing provision of the council ferry
service. 
3.2 A sensible starting position for the feasibility study was a baseline
study into the current services being provided. Economies of scale
enabled the inclusion of the Luing service at the same time,
Page 53 Agenda Item 9

Page 54

Classification: OFFICIAL
particularly as the Luing Community Council had separately
commenced a ‘Participation Request’ to investigate improvements
to the Cuan service. 
3.3 Caledonian Economics were engaged to carry out this work at a cost
of £10k leaving £90k for the remaining detailed study. 
3.4 The study at Appendix 1 therefore concentrates on the current
provision of lifeline services covering the islands of Luing and
Easdale. Both services use aging vessels and infrastructure, which
do not reach modern standards and expectations, to support a
variety of users within the communities 
3.5 The study was presented to members of the Environment,
Development and Infrastructure Committee on the 19th December
2024 and recommended Members:
• Thank the Easdale and Luing community council
representatives and residents for the high level of
engagement and return regarding the study.
• Discuss the contents and implications of the Mainland Ferries
Study (Appendix 1).
• Approve the continuation of the feasibility study to progress a
business case for the provision of infrastructure options to
Easdale, including fixed links.
• Approve the inclusion of options to Luing in the feasibility
study to continue to take advantage of economy of scale, and
• acknowledged the ongoing need to continue to engage with
residents and representatives of the communities on the Isle
of Luing, Isle of Seil, and Easdale, in relation to council run
ferry services and infrastructure. 
3.6 This decision was approved by members and is detailed in the
printed minutes at Appendix 2
4. Conclusion 
4.1 The study provides an overview of past and current service levels
and makes recommendations for the future infrastructure needs in
both locations. It Page 56 balances financial estimates with public
opinion to suggest options that are available and viable for council
purposes.. 
4.2 Officers will now further investigate the recommended options
including potential fixed links to replace both ferry crossings by
preparing a business case for each location. 
Page 54

Page 55

Classification: OFFICIAL
5.  SOA Outcomes 
5.1 Policy – None. 
5.2 Financial – None. 
5.3 Legal – None. 
5.4 HR – None. 
5.5 Fairer Scotland Duty: 
5.5.1 Equalities - protected characteristics - Vessel and Infrastructure
accessibility (Equalities Act). 
5.5.2 Socio-economic Duty - Lifeline ferries with no other current
means to travel to / from islands. 
5.5.3 Islands - Education, transport, health, business. 
5.6 Climate Change – Effect of increasing water levels and extreme weather
events on the infrastructure and provision of service. 
5.7 Risk - Vessel age and current infrastructure conditions. 
5.8 Customer Service - Complaints about current service levels will increase
as vessels age. 
5.9 The Rights of the Child (UNCRC) - Education and social access to
mainland facilities and services. 
For further information please contact:   
Kelly McKellar, 
Project Manager – Piers and Harbours, Argyll and Bute Council
Tel 01546 604 214 
Appendix 1 – Mainland Ferries Report
Appendix 2 – EDI Committee – Printed Minutes 191224 
Page 55

Page 56

This page is intentionally left blank

Page 57

Caledonian Economics 
Argyll & Bute Council
Mainland Ferries Study
Page 57

Page 58

Caledonian Economics 
Argyll & Bute Council
Mainland Ferries Study
Comparative Analysis of Options for Council-run ferries
April 2024
Page 58

Page 59

Caledonian Economics 
Introduction
Argyll & Bute Council is responsible for four ferry services to Jura, Luing, Easdale and Lismore.
Three of the four routes are operated using ageing vessels and none have any vessel redundancy.
The services currently operate at a significant deficit with a Scottish Government settlement
required to help bridge the funding gap.
The forthcoming Islands Connectivity Plan (ICP) being produced by Transport Scotland seeks to
address the future of ferry and alternative transport for Scottish Islands but excludes those ferry
services operated by Local Authorities. This report seeks to address the mainland ferry services
operated by Argyll and Bute Council.
The Jura –Islay route is not considered in this report. This is due to separate legislation that
covers this specific route which is set in a unique location and is subject to wider workstreams
already in motion.
The current Lismore service was initially considered within this report. The route is currently
serviced by the newest vessel in the fleet, with a life expectancy of at least 15 years.
There are issues with timetable provision which encroach on the operational performance,
these will be dealt with through a proposed ferry user forum to be established.
This report concentrates on the lifeline services provided between Luing– Seil and Easdale -
Seil. Both services are supported by aging vessels and insufficient infrastructure which does
not comply with current Equalities Act Legislation.
This report seeks to provide further information on current services and offers potential future
solutions in both locations along with information gathered via public consultation with local
users.
Page 59

Page 60

Caledonian Economics 
Isle of Luingand Easdale Island Ferry Crossings
Past, Present and Future
1. Background: Population trends and subsidies
2. Isle of Luing/Cuan Crossing:
• Past and present
• Options, analysis and conclusions
3. Isle of Easdale:
• Past and present
• Options, analysis and conclusions
4. Other Impacts on Public Services
5. Final Comments
6. Appendices
4
Page 60

Page 61

Caledonian Economics 
Population Trends
Argyll and Bute Population Forecasts
(Source: National Records of Scotland)
5
79,500
80,000
80,500
81,000
81,500
82,000
82,500
83,000
83,500
84,000
2023 2024 2025 2026 2027 2028
Argyll and Bute Population Forecast (2018 based,
Source NRS)
Population
0
5,000
10,000
15,000
20,000
25,000
30,000
0 to 15 16 to 24 25 to 44 45 to 64 65 to 74 75 and
over
Age cohort forecasts (2018-2028 Source: NRS)
2018 2028
The population of Argyll and Bute is forecast to fall and age
Page 61

Page 62

Caledonian Economics  6
• School roll forecasts for Easdale
and Luing were presented during
the statutory consultation on the
future of Luing Primary School.
These indicate a similar picture of
population decline
• The population of Oban Lorne
and the Isles is forecast to fall
and age, following a similar
pattern to Argyll and Bute
presented on the previous page
Population Trends
Oban, Lorne and the Isles
(Source: NHS Scotland)
Page 62

Page 63

Caledonian Economics 
Scottish Transport Appraisal Guidance (STAG)
Study, Cuan 2007
STAG Options Appraisal for Cuan Sound Crossing – key points
• Appraisal Conducted: Evaluation by STAG of the transport possibilities for the Cuan Sound
crossing.
• Options Considered: A range of solutions including high/low level bridges, a causeway, a
tunnel, and enhancements to the ferry service schedule.
• Identified Issues with current provision: Disruptions in the ferry service, insufficient capacity
during peak times, limitations for large vehicle transport, constrained Sunday/evening
services, financial challenges, high perceived costs, and limited access to Seil and the
mainland.
• Community Perspective: Debate on whether to retain and improve the current ferry service
or construct a fixed link.
• Excluded Options: low-level bridge, causeway, and tunnel options were rejected from initial
list due to navigation, environmental, geological, and financial concerns.
• Appraisal Conclusion: A detailed appraisal indicated that a bridge provides the most
significant improvement in accessibility, benefiting social inclusion, economic gains, and local
business growth.
• Overall Recommendation: Advised building a high-level bridge for optimal economic and
social advantages.
Framework for Luing’s Future 2022
Isle of Luing Community Housing and Business Needs Survey Report
2023
Consultation overview:
• Studies were carried out on behalf of the community
• Involved residents (past and present), stakeholders and authorities
Key Findings
• Strong community interest in enhancing connectivity
• Poor transport links are cited as a reason for people leaving the island
• Request for more reliable and frequent transport links to support local economy and
accessibility.
• Plans to develop housing and expand the economy
• Concerns about the current infrastructure’s capacity to meet future demands.
7
Isle of Luing
Cuan Sound Crossing
Past Studies
Page 63

Page 64

Caledonian Economics 
• MV Belnahua provides all sailings. The Grey Dog and/or alternative vessel is hired in
when MV Belnahuais away for her refits.
• The service runs at an annual loss of around £366,000 (based on the 2023 Service
Review), expected to rise to £470,000 as the vessel ages.
• MV Belnahua was built in 1972 and is at the end of her reasonable and already extended
life. Parts can no longer be sourced for her engines and work is required to bring her up to
standard with current marine requirements. She is also operating around 25% above
capacity to support demand, especially in summer. She is scheduled to have a life
extending refit early in 2024 that will fit new engines and other compliant equipment such
as fixed firefighting equipment and bilge alarms. This should extend her life for around 5
years but she needs to be retired.
• Current plan is that a new vessel will be built for the Jura-Islay route which would free up
MV Eilean Dhiurato replace the MV Belnahua.
• This is currently unfunded so there is not a timescale for this. The condition of the MV
Belnahuawould dictate a maximum of 5 years to prepare the Cuan crossing in readiness
for the MV Eilean Dhiurato use it, if it is freed up by then.
• The gradient on the pier on Luing does not meet Equalities Act guidelines and there
needs to be facilities for an overnight berth for the vessel.
• Previous proposals suggested a new slip would be constructed to suit MV Eilean Dhiura.
This would need be complicated by the need to operate the current slip until a new slip
was completed.
8
Isle of Luing
Cuan Sound Crossing
Current Situation
Page 64

Page 65

Caledonian Economics 
Passenger/Vehicle Numbers (on basis of
tickets sold)
2022/23 Actual HITRANS 2003
SPT Concessionary Travel 1044
Foot Passengers and drivers (single and
return)
9,805
Foot Passengers and driver on 5-Return
Journey tickets
5 x 2 x 2,453 = 24,530
Total Passengers 35,379 20,170
Private motor cars 3,276
Private motor cars on 5-Return tickets 5 x 2 x 1,406 = 14,060
Car Blue Badge 633
Motorcycles 52
Total cars and MCs 18,021 14,337
Commercial vehicles/coaches – 5-8m 484
Not availableCommercial vehicles/coaches – 8-12m 138
Commercial vehicles/coaches – 12-18m 5
9
• Passenger numbers increased by around 75% and private vehicles up 25% from
2003 to 2023
Isle of Luing
Cuan Sound Crossing
Ferry Services Data
Page 65

Page 66

Caledonian Economics 
Adult return Car return Commercial return
Per STAG (Published March
2007 so data assumed to
be from 2006)
£1.45 £5.90 £13.20
(>3.5t)
Current 2023 £2.50 £9.70 £17.10
(5-8m)
% increase 72% 64% 30%
10
• A range of other tickets are offered in addition to those shown, including multi-journey
booklets, concessions and children.
• Price inflation for the period 2006 to 2023 was around 65% so the price of the basic
passenger and car tickets appear to have kept pace with inflation.
• The price of tickets for commercial vehicles seems to have lagged inflation although the
basis of classifying commercials has changed from weight to length.
• SPT concessionary travel is too small value to be claimed back
Isle of Luing
Cuan Sound Crossing
Ticket Prices
Page 66

Page 67

Caledonian Economics  11
• Option 1 – Operate MV Belnahuafor five years, then open low bridge
• Option 2 - Operate MV Belnahuafor five years, then use MV Eilean Dhiura* for five years
to the same timetable, then open low bridge
• Option 3 - Operate MV Belnahuafor five years, then use MV Eilean Dhiura* for five years
with an enhanced timetable, then open low bridge
• Option 4 – Operate MV Belnahuafor five years, then open high bridge
• Option 5 - Operate MV Belnahuafor five years, then use a new vessel (hybrid-powered)
for the remainder of the period of the analysis (with mid-term replacement)
1. Assumed no scrap/resale value for ferries
2. ‘Low bridge’ would be an opening bridge to allow vessels to pass through
3. ‘High bridge’ would have clearance for vessels to pass under
* MV Eilean Dhiura currently operating on the Jura to Islay route and this option is subject
to Argyll and Bute Council gaining funding  for a replacement vessel for this route.
Isle of Luing
Cuan Sound Crossing
Future Options Assumptions
Page 67

Page 68

Caledonian Economics  12
• Net present value (NPV) using the Treasury Green Book discount rates is the correct metric
to use for investment appraisal of this type.
• Total cash is also shown for comparison.
• Capital cost cashflows are assumed to happen in the first year of operations for the asset
concerned.
30.0
34.3 35.4
49.5
84.8
22.9 22.7 23.5
38.8
50.6 
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Belnahua then low bridge Belnahua then E.D. same TT
then low bridge
Belnahua then E.D +TT then
low bridge
Belnahua then high bridge Belnahua then Hybrid
Cuan 60 year cash and NPV, £M
60yy Cash 60yy NPV
Isle of Luing
Cuan Sound Crossing Options
Net present value
Page 68

Page 69

Caledonian Economics  13
0.0
10.0
20.0
30.0
40.0
50.0
60.0
1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960
Cuan DCF £M
Belnahua then low bridge Cumulative
DCF/NPV
Belnahua then E.D. same TT then low bridge Cumulative
DCF/NPV
Belnahua then E.D +TT then low bridge Cumulative
DCF/NPV
Belnahua then Hybrid Cumulative
DCF/NPV
Belnahua then high bridge Cumulative
DCF/NPV
Isle of Luing
Cuan Sound Crossing Options
Discounted cash flow
• See Appendix 2.1 to 2.5 for details of how costing estimates were prepared
Page 69

Page 70

Caledonian Economics 
Support for a Fixed Link (Bridge or Tunnel):
• Over a quarter of respondents expressed explicit support for a fixed link, either a bridge or
tunnel
• those expressing support saw benefits in terms of connectivity and ease of access for work,
leisure and essential services.
• There were few specific objections to a fixed link - more people would simply prefer an
improved ferry service
Support for Ferry Service:
• Over half respondents expressed a preference for retention of the ferry service,
• However, many are dissatisfied with the vessel, the reliability, and the level of service.
• Commonly expressed views include a better vessel, an extension of the timetable, better
links with other public transport, and reduced fares.
Common Concerns and Suggestions:
• Cost: A common theme is the concern over the cost of the ferry service and its impact on the
island's residents, with suggestions for reduced fares.
• Accessibility: Several comments mention the need for better accessibility, especially for
wheelchairs and prams.
• Timetable: Many residents express a desire for a ferry timetable that accommodates
residents’ needs, including later services and better synchronization with buses.
• Sustainability: Some responses highlight the need for sustainability, mentioning electric
ferries and a service that doesn't rely on the ferry.
• Employment: The ferry service is noted as providing local employment, which is valued.
14
Isle of Luing
Cuan Sound Crossing Options
Residents Survey Findings (2024)
Page 70

Page 71

Caledonian Economics 
Financial Analysis1:
• a fixed link (low level) as soon as possible is the lowest cost in cash terms.
• Using the MV Eilean Dhuirabefore building a fixed link (low level) adds around £4M to the total in cash terms, no material difference in NPV
• Extending the timetable adds slightly over £1M in cash and NPV terms
• Compared to a low level bridge, a high level bridge adds around £20M (cash) or £8M (NPV). A high level bridge would be preferable from a navigability and resilience perspective.
• A permanent ferry solution is almost three times to cost of a low level bridge in cash terms, or around 1.7 times the cost of a high level bridge in NPV terms
Community views:
• There is notable dissatisfaction with the current arrangement
• This is a general preference for improving the ferry service, although a significant number of respondents see real benefits in a fixed link
• Few specific objections to a fixed link were raised.
Next steps/way forward:
• This is a preliminary analysis that could be expanded on in future studies. It is not intended to be a full options appraisal in line with the STAG and HMT Green Book methodologies, but it follows their principles and can be considered a starting point for full studies in the future.
• There is no plan for the route beyond the life of the existing aged vessels (MV Belnahuaand MV Eilean Dhiura).
• Thus, a solution needs to be in place in five years (without Eilean Dhiura) or in ten years (if Eilean Dhiurabecomes available)
• The long-term options are either a new vessel or a fixed link.
• The long-term costs of a fixed link are significantly less than a replacement ferry.
• The community has expressed dissatisfaction with the existing arrangement.  Some in the community would prefer to see this addressed by an improved ferry service, others would prefer a fixed link.
• The community has plans to attract new families to the island and to develop the local economy, including reopening a quarry.  Good transport connectivity will help these important initiatives succeed.
• Either solution will require significant capital investment.  A fixed link would provide a permanent solution at a lower cost, address many aspects of the community’s dissatisfaction with the current arrangements, and facilitate improvements in public service delivery.
• Considering long-term sustainability and cost-effectiveness, this study concludes that the preferred option from a technical and financial would be a fixed link.
• It is recommended that these options be explored more fully including detailed technical appraisals, updated STAG study and relevant community engagement in line with legislation.
15
1 60-year comparisons
Isle of Luing
Cuan Sound Crossing Options
Conclusions
Page 71

Page 72

Caledonian Economics 
Intentionally blank
16
Page 72

Page 73

Caledonian Economics 
Scottish Transport Appraisal Guidance (STAG) study, Easdale 2009
Transport Options Appraisal for Easdale Island – key points (2009)
• Appraisal Conducted: Evaluation by STAG to determine suitable transport options for Easdale
Island.
• Options Explored: Considered either an upgrade to the existing ferry service or the
construction of a causeway with a fixed bridge.
• Ferry Service Option: Found to be more cost-effective, aligned with transport objectives but
would require additional infrastructure and presented financial risks for the Council.
• Responsibility Transfer:Suggested that giving Islanders control could lead to better financial
management and tailored services (although it was unclear if there was appetite or capacity
for this in the community)
• Causeway Construction Option: Better reliability and safety at higher cost.  Would require an
Environmental Impact Assessment. Community acceptance uncertain (presumably meaning
that the community could block the development at the planning stage )
• Community Consideration: The causeway's benefits would depend on how much it is utilised
by the island's residents (although presumably this would be at least the same as the ferry
use)
• Overall Recommendation: the study was inconclusive.
17
Easdale Island
Easdale Sound Crossing
Past Studies
Page 73

Page 74

Caledonian Economics 
• Per the Easdale STAG, the route is covered by MV Fladdaand ML Easdale (relief vessel).
• The service runs at an annual loss of around £290,000 (based on the 2023 Service Review),
expected to rise to over £600,000.
• No plans for changes/improvements until the results of this appraisal are available.
• The harbour is owned by ‘Eilean Eisdeal’, the Easdale Island Community Development Group
• Slipway is owned by Argyll and Bute Council
• Easdale Island is privately owned. Owner was contacted for comment as part of this study but
has not responded.
• Ongoing dredging of the harbour at Easdale is undertaken by the Council if deemed necessary
along with any routine repairs to both slips as required.
18
Easdale Island
Easdale Sound Crossing
Current Situation
Page 74

Page 75

Caledonian Economics 
Passenger Numbers Easdale 2022/23 Actual1 HITRANS 20032
SPT Concessionary Travel 346
n/a
Out of Hours (before and after midnight).
Foot Passengers (individual single journeys). 10,690
Foot Passengers – travelling on 5-return
journey books sold)
12,422
Freight Customers n/a
Other (please specify) n/a
Total Usage (individual journeys) 23,458 18,1723
19
1 ABC - Marine Operations Data Requirements v3 (17 July 23)
2 Strategic Sea Crossings in the Highlands and Islands: Development
Opportunities 2005-2025, Nov 2005, Fisher Associates on behalf of HITRANS
3 a figure of 13,000 was given in the text of the STAG report
• Use has increased by around 29% 2003-2023
Easdale Island
Easdale Sound Crossing
Ferry Services Data
Page 75

Page 76

Caledonian Economics 
Adult return Car return Commercial
return
Per STAG (Published March
2009 so data assumed to be
from 2008)
£1.55
Passenger-only serviceCurrent 2023 £2.50
% increase 61%
20
• A range of other tickets are offered in addition to those shown, including multi-
journey booklets, concessions and children.
• Price inflation for the period 2008 to 2023 was around 65% so the price of the basic
passenger ticket appears to have kept pace with inflation
Easdale Island
Easdale Sound Crossing
Ticket Prices
Page 76

Page 77

Caledonian Economics  21
• Option 1 - Do minimum, continue to provide current service and replace vessels like
for like - minor improvements to waiting room/staff accommodation
• Option 2 - Replace the vessel with a Landing Craft-type vessel & minor waiting room
improvements (with mid-life replacement)
• Option 3 - Replace the vessel as above and build four breakwaters, relocate slipways,
and provide new waiting facilities
• Option 4 - Install fixed link (footway to take vehicles no larger than  quad bike size)
• Option 5 - Install fixed link as above with additional services
Easdale Island
Easdale Sound Crossing
Future Options Assumptions
Page 77

Page 78

Caledonian Economics  22
39.4
44.2
83.7
7.3
11.6
25.3 28.5
67.6
6.9 9.6 
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Option 1 Do minimum Option 2 - Landing Craft Option 3-  vessel +
breakwaters
Option 4 - Fixed link Option 5 - fixed link +
Easdale Crossing -60 year cash and NPV cumulative(£M)
Total Cash NPV @ 60 years
Easdale Island
Easdale Sound Crossing
Net Present Value
• See Appendix 1.1 to 1.5 for details of how costing estimates were prepared
Page 78

Page 79

Caledonian Economics  23
-
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59
Easdale -Cumulative Discounted Cashflow (£M)
Option 1 - Do Nothing
Option 2 - Replace with Landing Craft-type vessel and minor waiting room improvements.
Option 3 - Replace vessel as above and build 4No Breakwaters, relocate slipways, provide new waiting facilities
Option 4 - Fixed link
Option 5 - Fixed Link Plus Extra Support
Easdale Island
Easdale Sound Crossing
Discounted Cash Flow
• See Appendix 1.1 to 1.5 for details of how costing estimates were prepared
Page 79

Page 80

Caledonian Economics 
Support for Improving the Ferry Service:
• Residents prioritise compliance with legislation and addressing access issues due to climate
change.  Many called for a solution to the infilling of the harbour.
• There is a desire for a ferry better equipped to handle a range of items, reduce manual handling
issues, and improve accessibility
• Several residents emphasised the need to retain the ferry service to preserve the island's
character and prevent negative ecological impacts. Suggestions include better parking,
improved ferry facilities, and enhanced welfare facilities for staff
• There are calls for multiple breakwaters to be constructed to reduce weather interruptions,
ensure safety and stop the problem of slate filling the harbour.
Support for a Fixed Link:
• A very small number express a preference for a fixed link to modernise access to the island,
with one respondent specifically suggesting a bridge for its modern convenience and potential
to enhance trade.
Concerns and Additional Suggestions:
• The concerns about infrastructure extend to the preservation of the island's ecology and the
well-being of its wildlife, with some respondents worried about the introduction of invasive
species if a fixed link were built (Responses #5, #57).
• Residents express a deep appreciation for the ferry staff and the community spirit they
embody, highlighting the social aspect of the ferry service.
• There is an acknowledgment of the island's unique character and its appeal to tourists, which
many feel would be compromised by infrastructure changes.
• Financial sustainability of the ferry service was also mentioned, with suggestions for integrating
ferry ticket costs into council tax for residents and increasing prices for visitors.
24
Easdale Island
Easdale Sound Crossing
Residents Survey Findings (2024)
Page 80

Page 81

Caledonian Economics 
Financial Analysis:
• In cash terms, a fixed link is a fifth of the cost of maintaining the current arrangement, around one quarter in NPV terms.
• Continuation of the existing arrangement is around £5M cash (£3M NPV) less than replacement with a Landing Craft-type vessel with replacement at year 30.
• In NPV terms the cost of creating breakwaters (with replacement vessels and slip upgrades to meet regulations) is ten times the cost of creating a fixed link
Community views:
• There is resistance to a fixed link
• Concerns about a fixed link include ecological issues and fear of problems brought by visitors.
• Residents express a deep appreciation for the ferry staff and the community spirit they embody, highlighting the social aspect of the ferry service.
• The community values the island's unique character and its appeal to tourists. Many feel this would be compromised by a fixed link.
Next steps/way forward:
• This is a preliminary analysis that could be expanded on in future studies. It is not intended to be a full options appraisal in line with the STAG and HMT Green Book methodologies, but it follows their principles and can be considered a starting point for full studies.
• The cost of maintaining the existing arrangement is unviable.
• The costs of breakwaters are prohibitive.
• The long-term costs of a fixed link are far less than maintaining the existing arrangement.
• Considering long-term sustainability and cost-effectiveness, this study concludes that the preferred option from a technical and financial perspective would be a fixed link.
• It is recommended that these options be explored more fully including detailed technical appraisals, updated STAG study and relevant community engagement in line with legislation.
• The communities on Jura and Ulva operate ferry services themselves, funded directly by central government.  This is an additional option to consider for Easdale if the community were to present a sustainable and deliverable long-term business model.
25
Easdale Island
Easdale Sound Crossing
Conclusions
Page 81

Page 82

Caledonian Economics  26
Intentionally blank
Page 82

Page 83

Caledonian Economics 
Waste Collection - Luing:
• Currently a ‘narrow width’ refuse vehicle is used to provide waste pick up from Luing.
The weight of the the vehicle and refuse is restricted by the ferry weight limit.  The
Council has a limited number of such vehicles which increases the risk of service
interruption due to breakdowns.
• A fixed link would permit the use of a standard-width refuse vehicle on this route.  This
would improve the volume capacity and would reduce the risk of service interruption
due to breakdowns.
Waste Collection - Easdale:
• A fixed link would allow for easier transportation of the bins to Ellenabeich. This would
support a more regular pickup, reducing the demand for storage space and reducing
the pressure on public bins in Ellenabeich.
• A fixed link along with some improvements to the footpath network may also support
transport and recycling of heavier items such as white goods and building materials.
School transport:
• Luing – under the present arrangement, some pupils have to wait for the next
scheduled sailing. A fixed link would remove this constraint.
• Easdale – pupils sometimes must wait for space on the ferry, particularly during busier
summer months when school is still in session. A fixed link would remove this
constraint
• In both locations – inclement weather can prevent the ferries from sailing, resulting in
pupils being removed from school early to ensure they return home safely.  A fixed link
would reduce the frequency of these occurrences.
• In both locations - families incur additional ferry fares to attend parents’ evenings after
after-school events, and in some cases timetable restrictions may preclude attendance.
A fixed link would remove these costs/constraints.
27
Impacts/Implications
Council Services
Page 83

Page 84

Caledonian Economics 
Social and health:
• Under the current arrangements, social and healthcare professionals are limited in their
ability to provide care on both islands outside the ferry operating hours. 
• A fixed link would provide unhindered access to and from both islands allowing the same
standard of at-home care as in Seil and the mainland.
Blue light services:
• At Easdale, an air ambulance is used for every medical emergency. The provision of a fixed
link would enable the Scottish Ambulance Service to triage and send local ambulances to
attend when it is more appropriate to do so.
• At Luing, ferry staff are kept on standby to operate the ferry should emergency access be
required. A fixed link would allow emergency vehicles to attend emergencies more quickly,
especially during bad weather.
28
Impacts/Implications
Social, Health and Emergency Services
Page 84

Page 85

Caledonian Economics 
Other potential impacts:
• EV charging and utilities management – A fixed link would enable easier access for upgrading
and maintaining essential utilities.  This could include an upgrade to the electricity network
which may be required to expand EV charging provision.
• Plans for Quarry on Luing – LuingCommunity Trust plans to develop the quarry at Cullipool,
reviving small-scale slate production, protecting the island heritage and ensuring traditional
methods are passed on. A fixed link would support this by making it easier and less costly to
transport explosives, plant and equipment, and slate exports to and from the island.
• Housing – with a fixed link in place, the costs of transporting materials to Luing will be less and
should result in lower construction costs. Similarly, a fixed link may also attract new people to
the island, currently put off by the restrictions of a ferry connection.
• In Easdale, the transport of goods would be unrestricted, making it easier to receive deliveries
of cooking gas and fuel for power tools and similar needs.  It may also reduce the costs of trade
services such as electricians, plumbers, and other aspects of small-scale building projects.
• Tourism – A fixed link to both islands may enhance tourism opportunities by improving
connectivity, extending the tourist season, and providing opportunities for more unique
attractions, which would further enhance the visitor experience.
29
Impacts/Implications
Other Services
Page 85

Page 86

Caledonian Economics 
Luing Conclusions:
• A fixed link (low-level bridge) is identified as the most cost-effective solution in the long term. 
A high-level bridge would provide navigability and resilience advantages.
• The community shows dissatisfaction with the current ferry service arrangement, although
there's a preference for improving the ferry service.
• A significant proportion of respondents see benefits in a fixed link. Few specific objections to
a fixed link were raised.
• Considering long-term sustainability and cost-effectiveness, the study concludes that a fixed
link is the preferred option from both technical and financial perspectives.
• It is recommended that these options be explored further, including detailed technical
appraisals, an updated STAG study, and relevant community engagement.
EasdaleConclusions:
• The financial analysis reveals that a fixed link is substantially less costly over the long term
than maintaining or upgrading the current ferry arrangement.
• There is resistance within the community to a fixed link due to ecological concerns and the
potential impact on the island's character.
• A fixed link would resolve many issues related to service accessibility and reliability.
• The community values the ferry service for its employment opportunities and the community
spirit it fosters.
• Despite the financial advantages, the community's preference is for improving the ferry
service rather than establishing a fixed link.
Impacts on Public Services in the Islands:
• a fixed link could improve waste collection, school transport, and emergency services by
providing unrestricted access and addressing the limitations of ferry services.
• a fixed link could extend the tourist season and offer opportunities for unique attractions and
new jobs.
In summary, from a financial and technical standpoint, a fixed link presents a more sustainable
and cost-effective long-term solution for both Luingand Easdale. However, community
sentiment, particularly in Easdale, leans towards improving the existing ferry services due to
concerns over the cultural and ecological impact of a fixed link
30
Final Comments
Page 86

Page 87

Caledonian Economics 
Appendices
estimates/assumptions used in financial calculations
(provided by Argyll & Bute Council)
31
Page 87

Page 88

32
Do minimum, continue to provide current service and maintain existing vessels– minor
improvements to waiting room/staff accommodation
Annual costs Capital costs Annual Income Life span
Staff costs £400,000.00 0
Annual vessel and
infrastructure maintenance £240,553.00 0 Annual - cost
varies
Reset gabion baskets with
imported fill * £100,000.00 0 10 years
Dredging of Easdale
Harbour £40,000.00 0 2 years
Additional refuse
collection costs £30,000.00 Annual
Income from ticket sales £45,870.00 Annual
Waiting room
improvements ** £50,000.00 0 25 years
Totals £690,553.00 £150,000.00 £45,870.00
Appendix 1.1
Easdale Options 1
Do Minimum – Cost Estimates
• Staff costs include, 4 x skipper and crew, Technical Officer Ferries 25%, Admin Officer 15%,
Marine Ops Manager 5% (includes pay, holiday pay, pension, training and Contracted staff
costs)
• Vessel and infrastructure costs based on average of costs incurred between FY's 2013 - 2023
includes for vessel maintenance, infrastructure maintenance, ticketing software, VHF
licensing, crew PPE, safety checks, audits and inspections, CCTV, fuel etc
• Income based on financial year 22/23 ticket sales
• Annual dredging based on actual costs for work carried out in 2022 and 2024 averaged
• * Gabions - based on estimate of 4,000 tonnes of granite material at £20
per tonne delivered and baskets refilled and rebuilt. Estimate 3-4 weeks   
work, 2 persons and excavator
• ** Small sum for waiting/staff room improvements - details not determined
Page 88

Page 89

33
Replace current vessels with Carvoriatype vessel, minor waiting room improvements
Annual costs Capital costs Annual Income Life span
New vessel costs *** £270,000.00 0 30 years
Replacement vessel in year 30 £2,000,000.00 0
Amendments to existing pier to
suit new vessel and Equality Act
requirements ****
£1,500,000.00 0 40 years
Staff costs £400,000.00 0
Annual vessel and infrastructure
maintenance £240,553.00 0
Reset gabion baskets with
imported fill * £100,000.00 0 10 years
Dredging of Easdale Harbour £40,000.00 0 2 years
Income from ticket sales -£45,870.00
Waiting room improvements ** £50,000.00 0
Totals £680,553.00 £3,920,000.00 -£45,870.00
Appendix 1.2
Easdale Options 2
Landing Craft – Cost Estimates
• Staff costs, annual vessel and maintenance costs, dredging costs, gabions, waiting room
improvements and income as previous pages - does not allow for increased number of
crew to provide more sailings than current timetable allows.
• refuse collection costs removed - anticipated to be included in staff costs/time if this
option implemented.
• ***New vessel costs - assumption based on CMAL Carvoriavessel. Cost £200k in 2017
increased by inflation at 5% per year. New vessel anticipated life is 30 years. Alternative
vessels may cost more
• ****Existing slip improvement costs based on Iona slipway repairs at £650,000 for one
slipway - doubled for two plus round up to include for additional costs to get
plant/materials to Easdale
Page 89

Page 90

34
Replace vessel as above and build 4No Breakwaters, relocate slipways, provide new waiting
facilities
Annual costs Capital costs Annual
Income Life span
New vessel costs £270,000.00 30 years
Replacement vessel in year
30 £2,000,000.00
Construction of new
breakwaters £30,777,000.00 100 years
Construct new slipways and
additional infrastructure
(waiting room/fuel
store/path network on
Easdale) £15,000,000.00 100 years
Staff costs £400,000.00
Annual vessel and
infrastructure maintenance £240,553.00
Income from ticket sales -£45,870.00
Totals £640,553.00 £48,047,000.00 -£45,870.00
Appendix 1.3
Easdale Options 3
Breakwater – Cost Estimates
• Staff costs, vessel and replacement vessel costs and annual income as described in previous
pages.
• Breakwater volumes based on cross section area of 35m wide by 11m high with 5m wide flat
top = 181m2. Length of breakwaters estimates as follows West (Seil) - 190m, West (Easdale) -
225m, East (Seil) - 160m, East (Easdale) - 105m - total volume 123,080m3
• Breakwater cost based on average of latest Iona Breakwater estimate at £225/m3 plus
Dunoon breakwater in 2020 at  £209/m3 - average cost used of £217/m3
• Anticipate constructing new slips to reduce commitment to dredge harbour (not A&BC
owned) Seil slipway approx80m long by 6m wide (480m2) Easdale slip 95m long x 6m wide
(570m2)
• New waiting room costs - £300,000 (based on Iona toilet block costs at £215,000) includes for
additional pipe network or septic tank, upgrade of path network and new exclusive use fuel
store at Ellenabeich.
Page 90

Page 91

35
Install fixed link
Annual costs Capital costs Annual
Income Life span
Design and construction
costs £4,760,000.00 0
Land purchase £2,240,000.00 0
Annual inspection and
maintenance £5,000.00 0 125 years
Totals £5,000.00 £7,000,000.00 £0.00
Appendix 1.4
Easdale Options 4
Fixed Link – Cost Estimates
• Suggested design of short length of causeway to reduce span. Max span estimated at 70m
to maintain access via sea for smaller vessels - suggest steel truss or composite beams.
Bridge to be designed to suit crowd loading by pedestrians, cyclist and quad access. Max
4m wide with a parapet height of 1.5m, min design life of 125 years. Not suitable for
vehicular access larger than a quad bike or similar.
• Consider additional gate (perhaps coded?) on Easdale side for residents to manage night-
time access.
• On completion, structure will be added to existing bridge inspection and maintenance
regime. (Assumption max £5k per annum, likely less in first 10 years of operation)
• A&BC in-house design team may have availability to carry out design which may offer a
reduced cost.
Page 91

Page 92

36
Possible additional costs that could supplement a fixed link provision
Annual
costs
Capital costs Annual
income
Life span
Local Ranger Service (continues
employment in area)
£70,000 0 0 As required
Provision of coin operated trolleys
and trolley store for transporting
heavy goods/luggage
£6,000 0 15 year
Provision of quad bike and training
for operatives to move refuse bins
£500/
year
£8,000 0 20 years
Improvements to bin storage area £10,000 0 20 years
Appendix 1.5
Easdale Options 5
Fixed Link – Additional support - Cost Estimates
• Local ranger service, providing local employment. Based on 2 x full time employees, with
duties to include managing visitor behaviour, littering, car parking etc where feasible Could
extended to wider community duties on Easdale, Seil and Luing.
• Trolleys based on SBS Trailers marina troller. 10 @ £400 plus sum to create two trolley
stores, one located near car park and one centrally on Easdale (Hall?)
• Quad bike costs based on a £5,000 for Honda quad bike and trailer plus £1,000 for storage
shed and £2,000 for sundry items such as training, PPE, etc. Annual £500 towards
servicing, fuel etc
• Sum for improvements, e.g. hardstanding, fencing, for bin storage area on Easdale
Page 92

Page 93

37
Current service
Annual costs Capital costs Annual
Income Life span
Staff costs £450,000.00
Annual vessel and
infrastructure maintenance £205,000.00
5 years
remaining
Annual costs towards
bathymetric surveys and
dredging £10,000.00
Income from ticket sales -£190,336.00
Totals £665,000.00 £0.00 -£190,336.00
• Staff costs include, 4 x skipper and crew, Technical Officer Ferries 25%, Admin Officer
15%, Marine Ops Manager 5% (includes pay, holiday pay, pension, training and
Contracted staff costs)
• Vessel and infrastructure costs based on average of costs incurred between FY's 2013 -
2023 includes for vessel maintenance, infrastructure maintenance, ticketing software,
VHF licensing, crew PPE, safety checks, audits and inspections, CCTV, fuel etc.
• Income based on financial year 22/23 ticket sales.
• Annual dredging and survey costs based on percentage share of wider council
framework contract.
Appendix 2.1
Cuan Options
Current service assumptions
Page 93

Page 94

38
Replace vessel with Eilean Dhuira, same timetable
Annual costs Capital costs Annual Income Life span
Staff costs £450,000.00 5 - 10 years
Annual vessel and
infrastructure
maintenance
£280,000.00
Annual costs towards
bathymetric surveys
and dredging
£10,000.00
Income from ticket
sales -£190,336.00
Minor amendments to
existing pier to suit new
vessel and Equality Act
requirements ****
£1,500,000.00 25 years
Totals £740,000.00 £1,500,000.00 £190,336.00
Appendix 2.2
Cuan Options Assumptions
Eilean Dhuira on current timetable
• Staff costs, dredging costs and income as previous page.
• Annual vessel and maintenance costs based on Eilean Dhuiracosts in current
location.
• Slip improvements required for Eilean Dhiurabased on Iona slipway repairs at
£650,000 for one slipway - doubled for two plus round up to include for additional
costs to get plant/materials to Luing.
• Eilean Dhuirahas 40 tonne capacity compared to Belnahuaat 15 tonnes. Will allow
larger vehicles access to the island to support community projects.
• Eilean Dhuirareplacement not anticipated in next 5 years, Eilean Dhuirawill have
limited life span at point of relocation.
Page 94

Page 95

39
Eilean Dhuira with extended timetable – 2 additional crew members
Annual costs Capital costs Annual
Income Life span
Current staff costs £450,000.00 5 - 10 years
Staff costs * 2 £175,000.00
Annual vessel and infrastructure
maintenance £280,000.00
Annual costs towards bathymetric
surveys and dredging £10,000.00
Income from ticket sales -£190,336.00
Minor amendments to existing pier
to suit new vessel and Equality Act
requirements **** £1,500,000.00
Totals £915,000.00 £1,500,000.00 £190,336.00
• Staff, maintenance, vessel and infrastructure costs as Appendix 2.1.
• Assumed a minimum of 2 additional staff required to provide an extended timetable
beyond current provision
• Slip improvements required for Eilean Dhiurabased on Iona slipway repairs at £650,000 for
one slipway - doubled for two plus round up to include for additional costs to get
plant/materials to Luing.
• Income based on financial year 22/23 ticket sales. Potential additional income not
predicted.
Appendix 2.3
Cuan Options Assumptions
Eilean Dhuira with extended timetable
Page 95

Page 96

40
Replace with hybrid vessel, new slipways, extended timetable (more staff)
Annual costs Capital costs Annual Income
Current staff costs £450,000.00
Staff costs * 2 £175,000.00
New vessel £17,220,000.00
New slipways and waiting room/crew
room facilities at both sides £23,000,000.00
Annual vessel and infrastructure
maintenance £10,000.00
Annual costs towards bathymetric
surveys and dredging £10,000.00
Income from ticket sales £190,336.00
Totals £645,000.00 £40,220,000.00 £190,336.00
• Vessel costs based on MV Catriona, constructed in 2015. Unlikely this specific class is
suitable for the route but provides a reasonable cost comparison for the construction of
a hybrid vessel.
• At least a minimum of 2 additional crew members required to operate a new vessel.
• This option would require construction of new slipways, overnight berth and new waiting
facilities. This is likely to require additional land purchase to complete.
• This would present an opportunity to review fares and increase to reflect expenditure
and increase capacity on the route. Income left at current rates for this report.
Appendix 2.4
Cuan Options Assumptions
New Hybrid Vessel
Page 96

Page 97

41
Design and Build Fixed Link (High/Low level costs)
Annual costs Capital costs Annual
Income Life span
Design and construction costs
- low level £23,500,000.00 125 years
Design and construction costs
- high level £43,000,000.00 125 years
Annual inspection and
maintenance £5,000.00
2 x staff costs - options are
possible ranger service for
area if high level options
selected or operators for low
level swing bridge
£70,000 as required
Low Level Total £75,000 £23,500,000 125 years
High Level Total £5,000 £43,000,000 125 years
Appendix 2.5
Cuan Options Assumptions
Fixed Link
• High level bridge is anticipated to require meterage of new road on both approaches.
New road would be twin track to provide optimum forward sight distance on
approaches.
• Low level bridge is anticipated to require a section of the bridge that will open to sea
traffic. This will require a minimum of 2No staff members plus relief.
• Any bridge would be designed to current DMRB standard for all classification of
vehicles and be added to the Council’s bridge inspection list.
• It should be noted that the existing roads in this area are reasonably weak and any
solution that would likely increase the volume or load capacity of vehicles on the
Islands of Luingand Seil may result in a need to invest further fund into the local road
network to support usage.
• This includes for both a fixed link or any replacement vessel with a great tonnage or
capacity to carry more vehicles than at present.
Page 97

Page 98

42
Option
1 2 3 4 5
Belnahua
then low
bridge
Belnahua
then E.D.
same TT
then low
bridge
Belnahua
then E.D
+TT then
low bridge
Belnahua
then high
bridge
Belnahua
then Hybrid
Belnahua final service year 5 5 5 5 5
Eilean Dhuira first service year 0 6 6 0 0
Eilean Dhuira final service year 0 11 11 0 0
Hybrid Vessel Life Expectancy 0 0 0 0 30
Hybrid first service year 0 0 0 0 6
Hybrid  final service year 0 0 0 0 36
Replacement Hybrid first service
year 0 0 0 0 37
Replacement Hybrid final service
year 0 0 0 0 67
Fixed link open (year 0 = never) 6 12 12 6 0
Select High Level (1) or Low Level
(0) 0 0 0 1 1
Select Eilean Dhuira Timetable
Current (1) or Extended (0) 1 1 0 1 1
Appendix 2.6
Cuan Options Assumptions
Possible timings of option
* Indicates year i.e. Year1, Year 6 etc. Year 0 = never
Page 98

Page 99

MINUTES of MEETING of ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE
COMMITTEE held ON A HYBRID BASIS IN THE COUNCIL CHAMBER, KILMORY,
LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 19 DECEMBER 2024 
Present: Councillor John Armour (Chair) 
Also Present:
Councillor Jan Brown
Councillor Graham Hardie
Councillor Willie Hume
Councillor Jim Lynch
Councillor Tommy MacPherson
Councillor Ian James MacQuire
Councillor Luna Martin 
Councillor Kieron Green 
Councillor Ross Moreland
Councillor Gary Mulvaney
Councillor Alastair Redman
Councillor William Sinclair
Councillor Andrew Vennard
Councillor Peter Wallace 
Attending: Kirsty Flanagan, Executive Director
Stephen Hall, Consultant
Alan Millar, Performance Manager
Hugh O’Neill, Network and Standards Manager
Scott Reid, Marine Operations Manager
Stuart Watson, Assistant Network and Standards Manager
Colin Young, Strategic Transport Delivery Officer
Stuart McLean, Committee Manager 
Colin Buchanan, on behalf of Luing Community Council 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillor Andrew Kain. 
DEPUTATION 
The Chair intimated that a request for a deputation to be heard by Luing Community
Council had been received.  It was unanimously agreed to hear from this deputation. 
The Committee heard from Colin Buchanan, Vice Convener of Luing Community Council,
in relation to Marine Operations: Mainland Ferry Service which would be dealt with at Item
9 of the Agenda. 
The Chair thanked Colin Buchanan and advised that the submission would be considered
under item 9 of the Agenda (Marine Operations: Mainland Ferry Service). 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTES 
The Minutes of the meeting of the Environment, Development and Infrastructure
Committee held on 12 September 2024 were approved as a correct record.
Page 99

Page 100

4. ROUTE OPTIMISATION UPDATE 
The Committee gave consideration to a report providing an update on the Route
Optimisation project.  The Route Optimisation system will enable existing cyclical activities
such as bin collection, grass cutting and gritting, to be tested for efficiency and, where
possible, routes remodelled to be more efficient and effective. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. considered the progress of the Route Optimisation project; 
2. noted the delays to the initial progress plan and the new milestones; 
3. noted that monthly progress updates would be provided to Elected Members from
January 2025 via the RIS Weekly Briefings; and 
4. noted that a further update report would be brought back to the next Environment,
Development and Infrastructure Committee meeting in March 2025 together with a
demonstration of the system. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated December 2024, submitted) 
5. CEMETERY ASSET - ANNUAL REPORT 
The Committee gave consideration to a report providing the annual update on the current
Argyll and Bute “active” cemetery portfolio of 63 sites - number of lairs available for sale
and operational timescales within the Cemetery Development programme.  The report
also confirmed the current list of cemeteries subject to restrictions on the pre-sale of lairs. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. noted the annual lairs sales figures and remaining availability;  
2. noted the updated comments relevant to the Cemetery Development programme; and  
3. agreed the updated list of sites, where the pre-sale of lairs is restricted. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated December 2024, submitted) 
6. REVIEW OF ROADS AND INFRASTRUCTURE SERVICES - UPDATE 
The Committee gave consideration to a report providing an update on progress and next
steps in relation to the Roads and Infrastructure Service Review, 
Decision 
The Environment, Development and Infrastructure Committee – 
Page 100

Page 101

1. noted the content of the report; and  
2. agreed to receive a further report on progress of the Roads and Infrastructure Service
Review in March 2025 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated December 2024, submitted) 
7. SECOND DOMESTIC BIN REVIEW 2024 
The Committee gave consideration to a report seeking approval for officers to carry out an
online consultation exercise regarding second bins and the criteria that should be
considered for these. Paper copies of the consultation will be available in the Council’s
Customer Service Points for any person who is not able to complete the consultation
online. The report also provided an update on the review of second bins. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. agreed that officers carry out an online consultation exercise regarding second bins,
over a 4 week period in the new year. The criteria that should be considered for these,
with the detail of the consultation, being delegated to the Executive Director with
overall responsibility for Roads and Infrastructure Services, in consultation with the
Policy Lead for Roads, Transport and Amenity Services; 
2. agreed that the second domestic bin review be paused to allow consultation to be
undertaken on future eligibility of second bins; and  
3. noted that a report on the outcome of the consultation would be brought back to a
future Committee. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated December 2024, submitted) 
8. WASTE LANDFILL BAN UPDATE 
The Committee gave consideration to a report providing an update on the progress
towards landfill ban compliance. The report also provided an update on financial
implications in respect of the landfill ban and other waste issues. 
Decision 
The Environment, Development and Infrastructure Committee considered and noted the
content of the report. 
(Reference: Report by the Executive Director with responsibility for Roads and
Infrastructure Services dated December 2024, submitted) 
Page 101

Page 102

9. MARINE OPERATIONS: MAINLAND FERRY SERVICE 
The Committee gave consideration to a report introducing the “Argyll & Bute Council
Mainland Ferries Study – Comparative Analysis of Options for Council-run ferries” carried
out by Caledonian Economics (Mainland Ferries Study). 
Decision 
The Environment, Development and Infrastructure Committee – 
1. thanked the Easdale and Luing Community Council representatives and residents for
the high level of engagement and return regarding the questionnaires;  
2. discussed the contents and implications of the Mainland Ferries Study, detailed at
Appendix 1 to the submitted report;  
3. approved the continuation of the feasibility study to progress a business case for the
provision of infrastructure options to Easdale, including fixed links; 
4. approved the inclusion of options to Luing in the feasibility study to continue to take
advantage of economy of scale; and 
5. acknowledged the ongoing need to continue to engage with residents and
representatives of the communities on the Isle of Luing, Isle of Seil, and Easdale, in
relation to council run ferry services and infrastructure. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services, dated November 2024, submitted) 
10. 20MPH SPEED LIMITS REPORT 
The Committee gave consideration to a report detailing the support offered by Transport
Scotland to progress the 20mph speed limit project. 
Decision 
The Environment, Development and Infrastructure Committee- 
1. noted the Scottish Government had committed to creating a healthier, greener and safer
Scotland and their aspiration is that the introduction of 20mph restrictions could help to
contribute to these objectives – this is a national aspiration to be managed through local
powers to amend speed limits rather than changing the national legislation; 
2. welcomed the additional funding confirmed by Transport Scotland on 14 October 2024
for a Project Officer which would help to gather data necessary to allow the Council to
make informed decisions going forward;   
3. agreed that no decision would be made regarding the implementation of any speed
restrictions at this time; and   
4. agreed that as more detailed information becomes available, a further report would be
provided to update Elected Members via Committee.   
Page 102

Page 103

(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 16 November 2024, submitted) 
11. TRANSPORT (SCOTLAND) ACT 2019, PART 6 PARKING PROHIBITIONS
UPDATE REPORT 
The Committee gave consideration to a report providing an update on the introduction of
enforcement of the parking prohibitions contained in Part 6 of the Transport (Scotland) Act
2019 and seeking agreement to revise the timescales from December 2024 to 3 March
2025. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. agreed the revised timescale from December 2024 to 3 March 2025;  
2. noted the amended process as outlined in paragraph 4.8 of the submitted report; and 
3. requested that Officers explore options to identify areas where enforcement may cause
traffic management problems and if possible report back to this Committee options to
mitigate, including exemptions. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated 11 November 2024, submitted). 
12. ROADS RECONSTRUCTION BUDGET 
The Committee gave consideration to a report providing an update on future forecast
capital funding for roads reconstruction and improvements. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
report including the allocation of the provisional budget set out in the table at paragraph
3.6 of the submitted report. 
(Reference: Report by Executive Director with responsibility for Roads and Infrastructure
Services dated November 2024, submitted) 
13. DRAFT ACTIVE TRAVEL STRATEGY FOR CONSULTATION 
The Committee gave consideration to a report requesting approval to progress to
consultation on the draft of the Council’s Active Travel Strategy. The draft Active Travel
Strategy has been developed by Officers as instructed by this Committee on 1 June 2023. 
Decision 
The Environment, Development and Infrastructure Committee – 
1. considered and approved the draft Active Travel Strategy for a period of consultation;
and 
Page 103

Page 104

2. instructed Officers to provide a further report to this Committee on completion of the
consultation for members to consider and approve. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated December 2024, submitted) 
14. ENVIRONMENT, DEVELOPMENT AND INFRASTRUCTURE COMMITTEE
WORKPLAN 
The Environment, Development and Infrastructure Committee workplan was before the
Committee for noting. 
Decision 
The Environment, Development and Infrastructure Committee noted the content of the
workplan. 
(Reference: Environment, Development and Infrastructure Committee workplan dated
December 2024, submitted) 
VALEDICTORY 
The Chair acknowledged that Jim Smith, Head of Roads and Infrastructure, had left the
Council and noted his thanks on behalf of the Committee for all the work he had carried
out during his time with the Council.  The Chair recorded his personal thanks for Mr
Smith’s support during his term as Shadow Policy Lead, and latterly as Policy Lead. 
He then welcomed Stephen Hall to the meeting.  Mr Hall will take up post as the Interim
Head of Roads and Infrastructure from 6 January 2025. 
15. NOTICE OF MOTION UNDER STANDING ORDER 13 
The following Notice of Motion Under Standing Order 13 was before the Committee for
consideration – 
At its meeting on the 20th September 2024, the Strathclyde Concessionary Travel
Scheme (SCTS) Joint Committee approved a new fare structure to come into effect from
1st April 2025. The new model based on half standard fare, with a fare cap set at £2.50 for
a single and £4.00 for a return, is applied for wholly rural rail journeys and all ferry
journeys. 
Currently, rail and ferry journeys under approximately 10 (nautical) miles are charged at
£1.00 single and £1.50 return. This represents a fare increase of up to 165%, including on
lifeline ferry routes and disproportionately impact on the elderly and most vulnerable
members of our community. 
This Council: 
1. Expresses deep concern about the fare increases that have been agreed, noting that
residents of Argyll and Bute already face higher cost of living associated with rural and
island life, and these changes disproportionately impact on the elderly and most
vulnerable members of our community. 
Page 104

Page 105

2. Acknowledges demand and increasing operator fares will require SCTS funding
reserves of £0.836M by the end of this current financial year 2024/2025 and that
Strathclyde Concessionary Travel Scheme reimbursement costs continue to increase
sharply. 
3. Urges the Scottish Government to provide additional funding for the SCTS to support
older and disabled residents traveling and phase in changes to the pricing over a
number of years to mitigate the impact of changing to the new model. 
4. Agrees that the Policy Lead for Roads & Infrastructure write to the First Minister, John
Swinney MSP to highlight these concerns and request action to support elderly and
vulnerable service users. 
Moved by Councillor Peter Wallace, seconded by Councillor John Armour. 
Decision 
The Environment, Development and Infrastructure Committee agreed the terms of the
Motion and resolved accordingly.  
(Reference: Notice of Motion by Councillor Peter Wallace, seconded by Councillor John
Armour, submitted) 
Page 105

Page 106

This page is intentionally left blank

Page 107

OFFICIAL 
OFFICIAL 
Community Council Report Covering Oban, Lorn, Mid Argyll, Kintyre and the Islands – Covering January 2025 
Service Demand & Recorded Crimes Per
Beat Area
LB23/24
Calls: 182, Crimes: 43 
LB25
Calls: 21, Crimes: 4
LB26
Calls: 20, Crimes: 7
LB27
Calls: 49, Crimes: 16
LB28
Calls: 25, Crimes: 3
LB29
Calls: 10, Crimes: 0
LB30
Calls: 49, Crimes: 0 
LB31
Calls: 8, Crimes: 1
LB32
Calls: 10, Crimes: 1
LB33
Calls: 10, Crimes: 1
LB34
Calls: 21, Crimes: 1 
LB35/36
Calls: 91, Crimes: 35
LB37
Calls: 67, Crimes: 21
LB38
Calls: 15, Crimes: 1
LB39
Calls: 17, Crimes: 5
LB40
Calls: 25, Crimes: 7 
LB41
Calls: 8 Crimes: 0
LB42
Calls: 89, Crimes: 25
LB43
Calls: 40, Crimes: 7
LB44
Calls: 23, Crimes: 4
LB45
Calls: 23, Crimes: 0
Total
Calls: 804, Crimes: 182 
Beat Area  OLI Councils Served Beat Area MAKI Councils Served
LB23 & L24 Oban Community Council LB35 & LB36 Campbeltown Community Council
LB25 Luing Community Council
Isle of Seil & Easdale Community Council
Isle of Colonsay Community Council
Kilmore & Kilbride Community Council
Kilmelford & Kilninver Community Council
LB37 West Kintyre Community Council
Southend Community Council
Laggan Community Council
Gigha Community Council
LB26 North Connel Community Council
Ledaig Community Council
Benderloch Community Council
Barcaldine Community Council
Ardchattan Community Council
LB38 East Kintyre Community Council
LB27 Dunbeg Community Council
Connel Community Council
Taynuilt Community Council
LB39, 40, 41 Islay Community Council
Jura Community Council (included within Beat 39)
LB28 Dalmally Community Council
Avich & Kilchrennan Community Council
Glen Orchy & Innishail Community Council
LB42 Lochgilphead Community Council
North Knapdale  Community Council
Dunadd Community Council
Craignish Community Council
South Knapdale Community Council
LB29 Appin Community Council
Lismore Community Council
LB43 Furnace Community Council
West Loch Fyne Community Council
Inveraray Community Council
LB30, LB31, LB33 & LB34 Isle of Mull Community Council
Isle of Iona (included within Beat 34)
LB44 Tarbert Community Council
LB32 Isle of Tiree Community Council
Isle of Coll Community Council
LB45 Ardrishaig Community Council
Page 107
Agenda Item
10a

Page 108

OFFICIAL 
OFFICIAL 
Local Policing Priority Local Good News How can you help? 
• 13 Drug related seizures during January, as follows,
as a result of foot patrols and vehicle stops.
• Controlled Drugs: Class A – 4 seizures.
• Controlled Drugs: Class B – 9 seizures.
• Controlled Drugs: Class C – 0 seizures.
• This has resulted in, at present, 12 detected cases
being reported to the Procurator Fiscal.
Help us keep these drugs off your streets - 
stop drug related crime by reporting any
suspicions you may have either in person or
anonymously via 101 or via crime stoppers
online: 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
• 29 Acquisitive Crimes were recorded, again,
continuing the downward trend.
• 8 recorded Frauds in January – these continue to
normally be through internet processes, be it buying
things on Facebook, or engaging with people on the
phone.
• Remember to be fraud aware, the phone and
internet are still the main access points for criminals
to gain access to your banking/personal details.
• There were also 3 reported cases of Theft by
Shoplifting. 
Your local police would like for your
Community Council to help us by following us
on our social media channels and help us
spread crime prevention advice and guidance. 
• 42 Road Traffic offences were detected during
January. 
• 11 detected offences were due to driving under the
influence of drink and or drugs.
• The ‘Winter Safety Campaign’ will continue into
February with the aim of detecting offenders and
educating the public on the dangers and offences 
Your local police would like for your
Community Council to help us with ensuring
Road Safety by reporting anyone who is
suspected of drink or drug driving within your
community either in person via 101 or via
crime stoppers online: 
Page 108

Page 109

OFFICIAL 
OFFICIAL
associated with driving under the influence and road
safety advice.  
• Adverse weather has meant that we have recently
seen an increase in road traffic collisions. Further to
the winter safety campaign, we will also focus our
attention on informing the public regarding driving to
road conditions and ensuring their cars are Winter
ready 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
• 35 Recorded assaults during January including, as
follows,
Serious Assault – 0
Assault – No injury – 18
Assault – Injury – 5
Police Assault – 4
Assault against Retail Workers – 0
Emergency Workers - 6
• Targeting Anti-Social Behaviour (ASB) within our
local policing plans remains a priority.
• Patrols will continue with a view of identifying
offenders and disrupting their activities. 
Your local police would like for your
Community Council to help us with tackling
Violent Crime by reporting any ASB or
community concerns either in person via 101
or via crime stoppers online: 
Crimestoppers in Scotland | Crimestoppers
(crimestoppers-uk.org) 0800 555 111 
• Public Protection has numerous strands to it,
ranging from concerns about a neighbour who might
not be coping with their mental health to serious
sexual assaults. The below figures relate to our
more common call types during the month:
Missing Person Calls – 8
Concern for Person calls – 40
Child Protection Calls – 8
Sexual Offences Calls – 4 
Report to your local Police any concerns you
may have regarding potential victims of
Domestic Abuse or vulnerable persons, who
may be being exploited or who may just need
additional crime prevention support. Please
report this to us either in person or
anonymously. 
Page 109

Page 110

OFFICIAL 
OFFICIAL
Issues & Questions Raised by Community
Councils & Coucillors to the Communities
Team in January 2025 
*N.B. Where the issue is applicable to a section
above, this is included there 
You Raised: 
Campbeltown raised the topic of speed warning signs at the entrance of the town, following Transport
Scotland directing them to Police for a view. This was passed to the Road Policing Unit to link with all parties
directly to further discussion into this matter. 
Local MSPs have raised concerns of constituents regarding potential speeding at both Inveraray and Taynuilt.
Again, our Road Policing Unit have had the information fed into them for targeted patrols and speed checks.
Information has also been passed regarding applicable ownership of speed reduction measures / technology,
so that these stakeholders can be engaged with directly by MSPs to further review applicable opportunities. 
General News: 
Your local Policing area has seen a lot of resource placed into the ongoing search for missing person, Clare
Halliday; missing from the Isle of Mull since January 7th. A lot of our backroom functions that normally deal
with other matters are currently committed to continuing the progress of this search, in an effort to return Ms
Halliday to her loved ones. We appreciate your patience whilst the community teams are otherwise engaged
and might not be quite as quick at responding to enquiries as usual whilst this search is still ongoing. 
The recent Red Weather Event brought substantial challenges to the Police as we supported agencies in
tackling the response and subsequent fallout from the storm. We have detailed business continuity plans that
are implemented in such circumstances and were able to continue service for our communities despite the
nature of what was faced. 
Useful Links/Contacts: 
• Argyll and Bute Communtiy Directory - https://abcd.scot/ - this excellent site signposts you to all available services in your area, be it advocacy, counselling, debt
advice or animal welfare;
• Crimestoppers – Crimestoppers in Scotland | Crimestoppers (crimestoppers-uk.org) 0800 555 111
• Scottish Partnership Against Rural Crime – www.scottishparc.co.uk 
• Women’s Aid - Home - Women's Aid (womensaid.org.uk) 
• Citizens Advice – 0808 164 6000 & https://www.abcab.org.uk/ - Argyll and Bute Citizens Advice Bureau is a local, independent charity which provides free, impartial
and confidential advice and information to give you the tools you need to sort out any issues or problems;
Page 110

Page 111

OFFICIAL 
OFFICIAL
• Argyll and Bute Council Trading Standards – 01546 605 519
• Argyll and Bute Council – https://www.argyll-bute.gov.uk/my-council/how-contact-us 
• Transport Scotland – road related incidents and road closures - https://www.traffic.gov.scot/traffic-information/incidents
• Scottish Water - https://www.scottishwater.co.uk/Help-and-Resources/Contact-Us 0800 0778 778
• NHS24 (including mental health support) – 111 or https://www.nhsinform.scot/ 
• Scam Share Bulletin Trading Standards Scotland Bulletin 6 June (mailchi.mp)
• Age Scotland- Demetia Information and help- https://www.agescotland.org.uk/
• Neighbourhood Watch - sign up to to receive local alerts and bulletins for your community area - https://neighbourhoodwatchscotland.co.uk/#0 
• Scottish Environment Protection Agency (SEPA) - https://www.sepa.org.uk/ - for pollution, environmental safety, flooding, waste disposal/carrying enquiries 
Follow us on Social Media and help share local appeals and education messages:
• Facebook -  Police Scotland Argyll and West Dunbartonshire 
• X (formerly Twitter) – PSOSArgyllBute and PSOS ArgWestDunb 
Please contact the officer below with any feedback or concerns raised at the meeting for further considerations or police action. 
Report Completed by:  PC Jonathan Bruce
Contact for queries: Matthew.Shaw@scotland.police.uk & Keith.Alison@Scotland.police.uk 
Page 111

Page 112

This page is intentionally left blank

Page 113

Oban, Lorn and the Isles
CPG Briefing Report 
Q3 2024/25
Performance & Activity Report 
From: 1st October 2024 To: 31st December 2024 
Page 113 Agenda Item 10b

Page 114

Introduction 
Welcome to the Scottish Fire and Rescue Service Community Board Performance
Report. This performance report is designed to provide citizens, stakeholders and
partners with information relating to Community Board based activity undertaken by
the Scottish Fire and Rescue Service. 
Whilst using historic statistical benchmarking data, consideration must be taken of
the random nature of fire related incidents and events, and how this can pose
difficulties in interpreting emerging patterns and trends. This is of specific relevance
where Community Board level data is analysed due to the small number of actual
incidents/events that occur in Community Board areas. 
However, regardless of statistical anomalies, emerging patterns and trends in fire
related incidents and events can assist the Scottish Fire and Rescue Service and
Community Planning Partners plan and implement preventative intervention
initiatives to target reducing fire related incidents and events. 
Local Firefighter Training Plan
Below is a list of subjects the operational crews have been focusing on within this
period. Each subject has been covered both practically and theoretically and
recorded in the Fire Service Training recording system.
Training
Subjects
October/November/December
• BA – Quarterly Wear, Technical & Practical Session
• Pump & Ladder Drills
• RTC and Extrication Q3 – Cutting Techniques
& Casualty Rescue
• Water Awareness – Casualty Care
• SWAH – Tier 1, Single & Multi Edge Work Restraint
• TFOC Farms Module
• TFOC Local & Civil Disturbances Module
• HFSV Module 
Page 114

Page 115

Accidental Dwelling Fires (ADF)
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 1.7 0 1
Oban South & the Isles 2 1 1
Community Board Total 3.7 1 2 
ADF Casualties
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 0.3 0 0
Oban South & the Isles 0.3 1 0
Community Board Total 0.6 1 0 
Deliberate Secondary Fire Setting
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 0.3 1 0
Oban South & the Isles 0 0 0
Community Board Total 0.3 1 0 
Fires in Non-Domestic Property
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 1 1 1
Oban South & the Isles 1.7 2 3
Community Board Total 2.7 3 4 
Page 115

Page 116

Casualties from Non-Fire Emergencies
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 2 0 2
Oban South & the Isles 3.7 3 2
Community Board Total 5.7 3 4 
Unwanted Fire Alarm Signals
Ward 3 Year Average 2023/24 2024/25
Oban North & Lorn 12 3 7
Oban South & the Isles 23 15 12
Community Board Total 35 18 19               
Incidents/Activities of Note   
Drowning Incident Review (DIR) 
We continue to work with partners across Argyll & Bute to support the Drowning Incident Review. This allows us
to work together to establish ways in which we can reduce the risks around our waters in Argyll and Bute. 
Road & Water Safety campaigns 
Road Safety:
We have worked closely with Oban High School in delivering a Road Safety Presentation, including RTC VR input to
pupils who have their driving licence or are in the process of obtaining it. This included valued input from Oban Blue
Watch and EWDAB (East & West Dunbartonshire and Argyll & Bute) Community Action Team (CAT).  A similar
programme has now been timetabled for next year. 
Oban CAT Team has also worked closely with a pupil from Oban High School who was struck by a car in Oban during
a lunchtime last year. The young person (YP) sustained injuries that required surgery. The YP has recovered well and
enjoyed a firefighter for a day experience at Oban Community Fire Station. The YP also assisted us in promoting road
safety by sharing his story in an interview. This was shared, with permission, on our media page. 
We continue to work closely with schools delivering vital Road Safety messages, using our road safety floorboards
in primary schools.  The VR Program will now be made available to secondary schools throughout Argyll & Bute. 
Several CAT Team members are undergoing Child Seat Training in January. This will see the CAT Team putting on
events where people who use child safety seats have the chance to get them checked to ensure they are fitted
properly and, with the assistance of Police Scotland, receive road safety advice. 
Page 116

Page 117

We are also working in close partnership with Police Scotland and the Institute of Advanced Motoring (IAM) to
develop road safety hubs within Argyll & Bute.  Oban, Dunoon and Campbeltown Fire Stations are locations in which
this is being developed. 
Water Safety:
We continue to participate in Partnership Approach to Water Safety (PAWS) and our Community Action Team are
already delivering Water Safety Scotland Ice Safety presentations across schools in Argyll & Bute. The presentation
was delivered through a hybrid approach of face-to-face presentations and online via Microsoft Teams. This allows
us to engage with the remote schools throughout Argyll & Bute, including the islands, so that remote and rural
schools benefit from the same safety messages as larger schools. 
Community Engagement Activities 
• Post Domestic Incident Response (PDIR) following every domestic incident.
• Continue to deliver Fire Safety advice via HFSVs (Home Fire Safety Visits).
• Working closely with Sensory Impairment officers throughout Argyll & Bute providing much needed
assistance to people with complex hearing and sight issues.  Equipment is being made available to those in
need, along with a HFSV being conducted. 
• Representation on Multi Agency Risk Assessment Conferences (MARAC) for those affected by domestic
violence.
• Supporting Developing the Young Workforce through Careers Days in Oban, Tobermory, Lochgilphead,
Dunoon and Rothesay High Schools. 
• Supporting Partnership Approach to Water Safety (PAWS) group and engaging with the public:
#RESPECTTHEWATER campaign.
• We engaged with community groups utilising the Winter Thematic Action Plan (TAP)
• The annual Bonfire & Fireworks Presentations sessions were delivered by CAT in conjunction with Police
Scotland to schools across Argyll & Bute, including Dunoon Grammar, Oban High School and Lochgilphead
Joint Campus.  This approach was met with enthusiasm.  We also engaged with remote and rural schools over
Microsoft Teams, where the safety message was well received.
• We continue to support MCR Pathways in secondary schools.  Several SFRS employees give up their time to
support young people for an hour a week throughout term time, engaging with and mentoring each young
person to make informed choices.
• In Oban, the CAT team is supporting Planet Youth engagement.
• Our partnership working continues with Oban, Lorn and the Isles Alcohol & Drug Forum, with quarterly
meetings being held in the conference room at Oban Community Fire Station. 
• We continue to work alongside the Ukrainian Multi-Agency Resettlement Programme within Argyll & Bute.
• SFRS continues to support Violence Against Woman Group (VAWG) in Argyll & Bute.
• In partnership with Sensory Impairment, SFRS are delivering vital safety messages into Sheltered Housing &
Independent Housing complexes throughout Argyll & Bute.
• SFRS continues to support and assist in Adult Support & Protection (ASP) meetings, alongside partner
agencies, to ensure safety measures are in place for vulnerable people throughout Argyll & Bute.
• Oban CAT Team has been busy engaging with local Scout Groups, assisting and delivering vital safety
information to allow local young people to obtain their Fire Safety Badge and Communication Badge.
• Members of the Argyll & Bute CAT Team have been involved in Child Support Training and Trauma Informed
Training, delivered in conjunction with partner agencies.
• Oban CAT Team, with the assistance of Oban Wholetime Crews, helped the local charity Home Start Lorn to
collect and deliver presents to be donated to the local Christmas Appeal in Oban.
• Oban CAT and Fire Crews are working closely with the local LGBTQIA+ community. We are showing our
support by bringing the Firefighter Experience to them. We have extended the Firefighter Experience Day to
allow members of the LGBTQIA+ community the opportunity to come up and learn vital lifesaving skills and
understand what it is like to be a Firefighter over several sessions. 
Page 117

Page 118

Firefighter Experience Day:
The Oban CAT Team has been working closely with Live Argyll, Oban High School and Developing the Young
Workforce (DYW) to develop the Firefighter Experience Day. We have now extended this to a 4-week program.  Most
of the pupils involved have attendance issues, are care-experienced and/ or have behavioural issues. The
programme brings these pupils into a disciplined environment where they work as a team, rely on that team and
are pushed out of their comfort zones.  They attend the station once a week, learn skills including CPR, Trauma
Recognition, Water Safety, Road Safety and Drill Ground Activities. After each session they are given a written
assessment.  After the 4 weeks, these are checked and marked. This information is collated and submitted to the
school and works towards an award.
These sessions have proved very successful, to the extent that we are delivering a programme in Dunoon for 10
pupils from Dunoon Grammar in February.  We are hoping to develop this programme and bring it to other towns
in Argyll & Bute 
EWDAB LSO Activities 
• Ongoing On-call recruitment campaigns – Participation in Practical Selection Tests for new candidates as well
as successful completion of Task and Task Management by new On-call Firefighters across the area.
• SFRS personnel across EWDAB took part in supporting the 16 Days of Activism, tackling gender-based violence
against women and girls.
• Recruitment process for two vacancies within the Community Action Team, concluded with the appointments
of Gerrard Ralston (Salen Volunteer Leader) and Lisa Cox (previously CSA in PKAD LSO) as two new Community
Safety Advocates in our team. We extend a warm welcome to them both.
• Our Christmas Gift Appeal reached out to partners and communities across Argyll & Bute, allowing us to
collect toys to distribute to children, in partnership with Home-Start Lorn. Our thanks to all who supported
the appeal. 
Home Fire Safety 
Our new Home Fire Safety Visit (HFSV) policy and associated application will go live on Wednesday 12 February.
In preparation of the new policy going live, Stations have been managing pending lists and actioning HFSV
requests.
Referrals for the public and partners 
We will continue to support our partner agencies, to assist in this move. The current links to CSET (referral
platform) will be replaced on our external website, members of the public and partners will then request a HFSV
online via the new app. This will go live during February. Social media content and communications to partners will
also be issued to highlight the changes to our criteria and processes. We will also invite partners to attend
Microsoft Teams training sessions, to support this transition.    
One of the main highlights being SFRS commitment to protecting personal data in accordance with legislation, it is
imperative that all data sharing containing personal information of individuals such as name and address etc., is
transmitted to and from us via the new HFSV Portal or by Egress Secure Email. Therefore unfortunately, we are
now unable to accept referrals via emails 
To register for use of the new SFRS referral app, please contact our Safer Homes Team for support. Email
-  SFRS.HFSVadministrators@firescotland.gov.uk and one of the Safer Homes Team members will be in touch to
provide further information. 
Page 118

Page 119

1 
Argyll & Bute Community Planning
Partnership 
Area Community Planning Group 
Partnership update
Date: February 2025 
Partner update – Public Health 
The Public Health team would like to share some aspects of their current work.
The Argyll and Bute Joint Strategic Needs Assessment (JSNA), compiled by the
Public Health Intelligence team, was published in December. The JSNA is a
systematic approach to assess health and social care needs in the population based
on available data. The requirement for the HSCP to consider the needs of the
population and service-users is embedded with the Public Bodies (Joint Working)
(Scotland) Act 2014. It is an essential foundation to inform commissioning and
service planning and provides an evidence base for the next Joint Strategic Plan and
Joint Strategic Commissioning Plan.  Resources & Publications — Living Well. 
Community Link Workers 
The Argyll and Bute Community Links project is expanding in 2025. Recruitment for
new Community Link Workers is currently underway. This service is dedicated to
assisting individuals facing social, financial, and practical difficulties. It connects
people with both national and community-based support, equipping them with the
essential resources needed to navigate their situations and access appropriate
support and services. https://www.nhshighland.scot.nhs.uk/news/2025/01/new-
contract-and-expansion-for-community-link-working-service-in-argyll-and-bute/
Introducing the Mental Health Hub – Living Well
We are delighted to announce the launch of Mental Health Hub – Living Well in
Argyll and Bute, a new digital resource for you to share with colleagues.
This hub is a dedicated space where you can access trusted national support
services available across Scotland, with a particular focus on Argyll and Bute. It
includes helplines, practical self-help tools, and resources to provide support.
Page 119 Agenda Item 10c

Page 120

2 
Designed to promote mental wellbeing and prevent suicide, the hub aims to make it
easier to navigate the vast number of available services. It provides a clear, user-
friendly way to signpost to the support available to communities in Argyll and Bute.
Developed with input from local organisations, the hub is designed to empower
individuals, families, and professionals to access support tailored to local needs. 
For further details, please contact: olena.mishanina@nhs.scot Tel: 07483320722
Mental Health Awareness and Suicide Prevention Training
The Public Health team is proud to continue supporting mental health awareness
and suicide prevention training for people who live or work in Argyll and Bute.
Several training sessions are scheduled until the end of the financial year:
Applied Suicide Intervention Skills Training (ASIST): 
ASIST training is being run in Islay in January, Oban in February and Bute in March.
Ask, Tell Workshops can be delivered online or in person upon request, making
them flexible and accessible to suit the needs of communities.
For further information on both please email nhsh.ab-sptraining@nhs.scot .
Youth Mental Health First Aid Training will run in January, February, and March. Due
to high demand, we are also planning an extra cohort in February. To sign up: 
Book for February         Book for March 
Alcohol and Drugs Partnership (ADP)
Prevention and Early Intervention – Planet Youth
Planet Youth is all about communities acting in the best interest of children and
young people to make Argyll and Bute a great place to live. It is a community-based
approach focused on improving young people’s health, wellbeing, and relationships
by working with parents, carers, schools, communities and organisations. Planet
Youth originated in Iceland, which went from having the highest rates of teen
smoking, alcohol and drug use across Europe to the lowest.
The Planet Youth team are running a comms campaign from Jan-March/April to
promote their health topic leaflets for parents and carers. 
The Planet Youth team are delivering a ‘Risk and Protective Factors for Children and
Young People’ live Webinar for any interested adult community members in A&B.
Date tbc: argyllandbute@planetyouth.scot 
Page 120

Page 121

3 
Families Affected by Alcohol and Drugs
Scottish Families Affected by Alcohol and Drugs (SFAD) in collaboration with
stakeholders are developing a partnership plan informed by gathering evidence from
those in services, people personally impacted and professionals working within the
community to reduce alcohol and drug harms. The plan will outline priorities to
embed a whole family approach through local organisations and services with
governance, monitoring and evaluation, and ongoing community engagement. 
Recovery Orientated Systems of Care (ROSC)
Lomond and Argyll Advocacy Service provide specific independent advocacy
support to people affected by alcohol and drugs with an extended presence in Argyll
and Bute. https://laas.org.uk/contact-us/ 
An analysis of the interviews conducted by Scottish Drugs Forum with families,
service providers and people with lived experience of Medically Associated
Treatment (MAT) will be submitted to Public Health Scotland in April.
The ADP submitted feedback on the consultation of the Right to Addiction Recovery
(Scotland) Bill in December. 
Alcohol and Drug Partnership Strategy and Health Needs Assessment
The reviewing and development of the ADP Strategy is almost complete. Led by a
steering group, a consultant held 23 stakeholder interviews and three workshops.
The final draft will be presented at the next ADP Partnership meeting.
In Dec/Jan an online survey was used to gather the views of people living and
working in Argyll and Bute asking about community priorities and what differences or
changes would indicate that drug or alcohol related harm is being reduced.
Alcohol Brief Intervention Training
Alcohol Screening and Brief Interventions (ABIs) are effective and evidence-based
early intervention for those individuals who are drinking at hazardous and harmful
levels. Training dates to learn how to deliver Alcohol Brief are bookable on Turas:
https://turasdashboard.nes.nhs.scot/ 
Naloxone Training
Administering Naloxone can reverse the effects of an Opioid Overdose. Training on
how to use Naloxone is planned for Helensburgh and Dunoon. For more information,
please contact Kirsteen Menzies, Tel. 07900146571.
GP Training
Page 121

Page 122

4 
Bespoke training sessions for GPs, designed in consultation with our GP
representative and the Drug Related Deaths group will be provided by the Scottish
Drugs Forum. This will cover Gabapentin, Ketamine and Benzodiazepines.
For further details, please contact: nhsh.argyllandbuteadp@nhs.scot
Screening inequalities grants funding
We are delighted to announce that Screening Inequalities funding has been awarded
to Argyll and Bute. This is being used to address barriers and facilitate access
across the screening and treatment pathway to reduce inequalities in screening and
improve health outcomes.  Small grants were offered to organisations working with
the people less likely to participate in the NHS Screening Programmes to promote
screening in ways which will benefit their clients, such as to facilitate community
events, provide information sessions and make culturally appropriate promotion
materials which reflect the needs of communities.
End of the Waverley Care contract
NHS Highland’s contract with Waverley Care was due to end in December 2024.
Following completion of a detailed review and exploration of options for future
delivery, a decision was made to bring the services in-house.  NHS Highland worked
closely with Waverley Care to ensure a smooth transition of services. The Argyll and
Bute Health Improvement Team are delighted to announce that Debbie Lees from
Waverley Care has joined them, with the remaining staff joining the Health
Improvement Team in North Highland.  Debbie will bring her experience from
Waverley Care to work in Argyll & Bute on developing sexual health promotion and
the prevention of poor sexual health. 
The condoms by post service has transferred to the HIRS Team in North Highland
and promotion materials for this service is being printed to be shared. The weblink is:
Argyll & Bute HSCP Free Condoms by Post
Living Well Networks
The existing Living Well Networks (LWNs) are for partners with an interest in building
healthy communities. They provide an opportunity for partners to come together to
find out what issues matter to local communities; to plan activities and events
together; and to network with individuals, services and organisations with an interest
in improving health. Argyll and Bute HSCP Public Health team has provided funding
for the network coordination time for a number of years.
Over the past few years, there have been changes within HSCP structures, including
the refreshed Living Well Programme Board and these transformations are
continuing.  The way people access information and support has also undergone
changes as are the opportunities for communities to come to engage and plan
community activity. As such, a decision has been made to bring the existing Living
Page 122

Page 123

5 
Well Network coordination to an end. We encourage the networks to consider their
future direction. They can choose to continue without the funded coordination or
explore the option of self-sustainability, allowing them to maintain their meetings and
ongoing networking.
The multi-partner initiative, Community Assets for Living Well is also focused on
promoting healthy communities and work is ongoing to explore how this translates
into work within local communities. This includes plans to further improve the Argyll
and Bute community directory by developing a centralised and accessible platform
for health and wellbeing information, resources, support, and services. Health,
wellbeing and support service information can still be accessed via Argyll and Bute’s
Community Directory on https://abcd.scot .
We would like to express our sincere gratitude to our past and present coordinators:
Dee James/Nicola Hall from Argyll and Bute Rape Crisis, Fiona Kalache/Lynn
Johnstone from Mid Argyll Youth Development Services, Tracy Chambers from
Kintyre Link Club, and Independent coordinators Carol Flett and Veronica Ferguson. 
REPORT AUTHOR AND CONTACT
Author Names: Angela Coll, Health Improvement Senior 
Email: nhsh.abhealthimprovement@nhs.scot
Page 123

Page 124

This page is intentionally left blank

Page 125

We have 97 clients at the moment. We have 16 new carers and we have 1 carer on the
waiting list.
We are now providing 195hrs per week in total, 54hrs a week are for Care at Home, paid for
by Social Work or Self-Directed Support.
The service on Tiree has stalled a wee bit due to staffing issues, but we have just advertised
for new staff on the island. Hopefully the service will be up and running again.
The service on Mull is growing, we now have 5 staff covering the island and are providing
75hrs per week.
We are also receiving more referrals for respite on the Isle of Seil too, so we are getting out
to the remote and rural areas of Oban, Lorn and the Isles.
We are also in the process of running a pilot for Gypsy/Traveller Unpaid Carers covering
workshops on basket weaving. The aim is to get a group of Gypsy/Traveller Unpaid Carers
to meet in a group setting doing an activity that is part of their culture.
Joan Best
Crossroads North Argyll 
Page 125 Agenda Item 10d

Page 126

This page is intentionally left blank

Page 127

Oban and Lorn and the Islands Living Well Network                                                                                                                                           
29/01/2025 
Funding ending March 2025.                                                                                                                                                     
The Living Well Networks in Argyll and Bute will not be funded by HSCP after the end of March this year
and so I will finish in my current role as Living Well Network Coordinator for Oban, Lorn and the Islands on
31st March 2025.  I would like to thank everyone for their support over the past 10 years, it has been a
true pleasure being your Living Well Network Coordinator.   I would also like to thank people for their good
wishes and very kind words. 
Two Network Meetings in February and March                                                                                                                    
As Living Well Network Coordinator for Oban, Lorn and the Islands, I am planning two final Network
Meetings, both will be by Zoom. 
Wednesday 12th February from 11am till 12 noon.    At this meeting we will look at what a Network
without Coordinator funding might look like and what I as the coordinator can do to support that.
Friday 21st March from 10am till 12 noon.  All Network Members will have a few minutes to share
information about the work they do.  Hopefully this will be a valuable networking meeting.   
E-mail list of Living Well Network Members                                                                                                                              
The current e-mail list of Living Well Network Members will be handed to the HSCP Public Health Team on
31st March 2025.  The Public Health Team will use this to send out their information unless you opt out.  
The Network will need to create a new e-mail list for use by current Living Well Network Members after
the end of March 2025.  This list could be shared so 3rd sector organisations etc can circulate information. 
This will be discussed at the meeting on 12th February.  
If you would like to be included in the e-mail list that will be created for use after the end of March, please
e-mail me on tcmhwn@gmail.com giving your full name, name of organisation and your role/job title.   
Carol Flett
Living Well Network Coordinator
07753218327
Page 127 Agenda Item 10e

Page 128

This page is intentionally left blank

Page 129

Report Oban, Lorn and the Isles Partner Update
Paper Argyll and Bute Third Sector Interface 
Date 4th February 2025
Prepared by Petra Pearce, Third Sector Support Adviser, OLI 
Argyll and Bute Resilience and Transformation Fund 
The TSI on behalf of the Argyll and Bute LAG launched a small, targeted fund aimed at
supporting Argyll and Bute’s Third Sector Organisations (TSOs), specifically those who can be
classified as community anchor organisations, to transform the way they work at a time of
significant financial challenge.
The fund was Launched on 24th January applications closed on 3rd February 2025 at 10am. 
Other sources of funding can also be accessed via https://argylltsi-funding.org.uk/
Day Services for Older People Review
The Integration Joint Board in March 2024 requested a full review of day services and day
supports for older adults in Argyll and Bute. The direction was to carry out this review removing
the threat of cuts or service closure from the existing services. The financial situation of the IJB
in line with other IJBs however is one of increasing costs and demands and reduced allocation
of funding, meaning that overall savings need to be made. The timeline is to complete the review
in mid-2025.
The TSI on behalf of the HSCP has commissioned a local research agency (GLIC) to map and
audit services with the intention of supporting the development of a new community-based
approach to Day Supports and Day Services for Older Adults in Argyll and Bute that reduces the
disparities in service provision across different localities. 
Volunteer of the Year 2025
Nominations for the TSI Volunteer of the Year 2025 awards are now open. This annual event is
designed to recognise the outstanding work done by individuals and groups across the whole of
Argyll and Bute. This year’s event will be held at the Rosslea Hall Hotel in Rhu. On Friday 6th
June 2025, 3pm-6pm.
Whether it is a friend, family member, or group that has made a difference, now is the time to
give them the recognition they deserve. Nominations are open until 18th April 2025.
Further information on how to nominate can be found at https://voyargyllbute.co.uk/
Wellbeing Development Manager
The TSI hosts a Wellbeing Development Manager post funded by the HSCP and Macmillan
Cancer Support under the Living Well Workstream. The postholder is focussing on developing
ways of working that promotes wellbeing in communities by building sustainable and trusting
local partnerships. 
There are currently three workstreams. 
Page 129 Agenda Item 10f

Page 130

The first, called the Art of Hosting, focuses on spreading the tools needed to have meaningful
conversations about the choices, challenges and solutions facing our communities. 
The second is bringing about a Walking Development post in conjunction with Paths for All. 
The third workstream is looking at building joint and integrated referral and information
processes to make it easier to access the support people need and this project is called One
Front Door. 
More information on all of this can be found here: https://www.argylltsi.org/living-well-
partnership/
Winter Welcome Spaces
A list of venues providing access to winter welcome spaces can be found here:
https://www.argylltsi.org/warm-spaces/ 
Page 130

Page 131

Principal and Chief Executive: Martin Jones
www.argyll.uhi.ac.uk 
UHI Argyll is a trading name of Argyll College Ltd
a charity registered in Scotland No SC026685
Registered address: West Bay, Dunoon, PA23 7HP 
UHI Argyll – Oban: Update for Oban, Lorn and the Isles Community Planning Group meeting 12/2/2025 
Semester two
Semester 2 began on Monday 20th January. We are offering the following January-start courses at our Oban centre
(some other centres have additional practical courses on offer): 
• NQ Access to Further Education, SCQF level 4. Full time, short course (3 days/week for 11 weeks). Available
at all UHI Argyll centres.
• NC Horticulture, SCQF level 5. Full time, single semester course (3 days/week for 17 weeks). Available at
Dunoon centre only. 
• NPA Games Development, SCQF level 5. Part-time (Thursdays) for 17 weeks. Available at all UHI Argyll
centres.
• PDA Technology Enabled Care, SCQF level 7. Part-time: 4 hours/week for 17 weeks. Available at all UHI Argyll
centres.
• Health and Social Care: Administration of Medication PDA. Part-time for 6 months. Available at all UHI Argyll
centres. 
As always, there is the option to infill onto many of our other courses that run for the full academic year. Applicants
can choose a single unit or several units and should contact their local centre to enquire about this. 
Commercial courses
We are offering commercial courses on the following dates: 
• Personal Licence: 3rd March (full day), 7th April (full day), 9th and 16th April (evenings)
• Elementary Food Hygiene: 10th March (full day), 31st March (full day), 12th and 19th April (evenings), 28th April
(full day)
First Aid training can be booked by contacting the local centre. 
Open events/taster sessions
Instead of a single open day, we held taster events so that potential applicants could find out more about our
courses. Below is a list of events that we held prior to the start of semester two: 
• Garden Design workshop (online)
• Plant propagation workshop (Helensburgh)
• Horticulture Courses at UHI Argyll, information session (online)
• Maritime Rope Workshop (Oban)
• Introduction to Plantsmanship (online)
• Access to Further Education, information session (online)
• Computer Games Development workshop (online)
• 
Page 131 Agenda Item 10g

Page 132

Principal and Chief Executive: Martin Jones
www.argyll.uhi.ac.uk 
UHI Argyll is a trading name of Argyll College Ltd
a charity registered in Scotland No SC026685
Registered address: West Bay, Dunoon, PA23 7HP 
We also have an online event scheduled for various dates later in the academic year:
• Childhood, Youth, Community Development and Children’s Rights online workshop: 6th March; 1st May; 7th
August; 2nd October. Timings for all dates are 6.30-7.30pm. 
Theresa Bain
Cluster Centre Manager
UHI Argyll
Theresa.Bain@uhi.ac.uk 
Page 132

Page 133

Date: 22 January 2025 
Argyll and Bute Climate Action: developing a Climate Change
Strategy and Action Plan for Argyll and Bute. 
1.0 Purpose 
The purpose of this report is to provide an update on the Community Planning
Partnership’s Argyll and Bute Climate Action project: developing a Climate Change
Strategy and Action Plan for Argyll and Bute. 
2.0 Recommendations 
The CPG is asked to note the approach and status of the project outlined in the
report and to provide any comments or feedback to the project manager. 
3.0 Background 
The CPP sub-group working on climate change is the Climate Change Working
Group. Its current focus is producing a Climate Change Strategy and Action Plan for
Argyll and Bute. Argyll & the Isles Coast and Countryside Trust (ACT) are the
employing body for the Climate Change Project Manager leading on the process,
and the post (0.8 FTE) is funded by the CPP from end October 2023 to October
2025.
This update sets out the current position.
4.0 Detail 
4.1 Progress
The draft strategy was presented to the Climate Change Working Group, the CPP
Full Partnership and  Area CPGs over September to November 2024, with requests
for feedback and comments including appropriate engagement opportunities.
Based on the feedback received, a revised draft was submitted to the CPP
Management Committee.
The CPP Management Committee approved the revised draft at its meeting of 6
December 2024, and copies of the executive summary and appendix of local climate
Page 133 Agenda Item 11a

Page 134

trends accompany this update. The full set of appendices can be found at
https://www.act-now.org.uk/cpp  
The intention thereafter is to work up the action plan and pilot projects, including
seeking funding for projects, with partners across the region. This is where input at
Area level would be especially useful and the project officer would welcome advice
from Area CPGs on the most appropriate groups in their respective areas to contact. 
The CPP agreed that the strategy should align with the three CPP outcomes
(Housing, Transport Infrastructure and Community Wellbeing), that it should focus on
action within its own agency to control or influence, and, in line with the risk scoping
and gap and opportunity analysis, priority areas for action should be: 
o Infrastructure (including natural infrastructure)
o Policy Influence
o Procurement and Supply Chain
o Resilience/Carbon Literacy Training
o Risk/Economic Assessment
o Skills Development
o Crosscutting/Other
The Management Committee noted that development of the action plan would likely
reflect partners’ capacity to engage over and above their normal core work, and
agreed that the Committee should provide direction as the action plan develops on
the balance between playing to the CPP partners’ strengths or seeking to address
gaps and weaknesses. 
The Management Committee
We make Argyll and Bute climate ready by acting together to understand and
adapt to our changing climate 
4.2  Next Steps 
Immediate next steps are:
• Produce a short easy-to read summary plus a version suitable for young people.
• Develop a broader programme of engagement, including Area level
• Ongoing mapping, local impact projections and risk assessment 
• December – February action plan and project development, ongoing risk
assessment informed by engagement
• March first draft of action plan to Climate Change Working Group 
Andy Macpherson, Climate Change Project Manager 
For more information, please contact: Andy Macpherson andy@act-now.org.uk 
Page 134

Page 135

Executive Summary
Climate change is one of the most serious threats that we face in Scotland. Rising
temperatures, drier summers, wetter winters, sea level rise, and an increased risk of
flooding, will all affect our lives. There is a global need to take action to reduce the
greenhouse gas emissions which are responsible, but changes in climate will not be
completely eliminated by these actions. We also need to find ways of adapting to the
effects of climate change.
We make Argyll and Bute climate ready by acting together to understand
and adapt to our changing climate.
It has been developed through an engagement process managed by the Argyll
Countryside Trust on behalf of Argyll & Bute’s Community Planning Partnership,
Climate Working Group, with funding thanks to Argyll and Bute Council, NHS
Highland, NatureScot and Argyll & Bute Third Sector Interface.
A climate change strategy for Argyll & Bute
Argyll & Bute Climate Action
It forms part of Argyll & Bute’s Outcomes Improvement Plan for 2024 – 2034 which
focusses on improving the outcomes of Transport, Housing and Community
Wellbeing.
This is a strategy and action plan for Argyll & Bute. A region wide, community led,
net-zero, climate change resilient, adaptation plan, in support of the vision that:
Page 135

Page 136

The heavy rain in early October 2023 caused £15m
damage to infrastructure (mainly roads and bridges)
in parts of Argyll & Bute
Now and into the future, we want a thriving Argyll & Bute where our collective
choices and actions enhance our continued wellbeing in a changing climate.
Our climate change strategy seeks to tackle climate change, by  working
together to be:
Climate friendly: Reduce Argyll & Bute’s greenhouse gas emissions that
contribute to climate change (mitigation).
Climate Ready: Resilient and adapted to unavoidable climate change
(adaptation), and
Climate Just: Ensure all of our communities are included.
80% of the population of Argyll & Bute
lives within 1km of the coast (97% within
10km of coast), and we have over
200km of road within 25m of the sea (at
high tide).
Page 136

Page 137

Climate Risk Impact
Warmer, wetter winters: Increased rainfall
volume and intensity
Increased landslides,  flooded water
courses and more surface water
Hotter, drier summers: higher average and
higher peak temperatures, increased
heatwave frequency and longer drought
periods
higher risk of human and animal heat
stress, illness and mortality, crop failure,
wildfires and freshwater scarcity
More severe, and more variable weather
events:  Less predictable but more
frequent storms, increased variability in
wind speed and direction, higher peak
wind speeds, higher rainfall intensity
windblow, forest damage, road blockage,
power line damage/power cuts, property
damage,  flooding, landslides.
Sea level rise and storm surges: increased
coastal erosion
coastal infrastructure damage and loss,
coastal retreat or protection cost
Multi-hazards affecting people, species
and habitats: Combination of hazards
compounding climate risks and impacts.
Single actions less likely to address
mitigation or adaptation. Solutions needs
to maximise multiple benefits and work
with natural processes.
Increased climate unpredictability
Climate forecasts less predictable,
actions need to be based on worst-case
scenarios, resilience more dependent on
agile and diverse actions.
Our strategy identifies the key climate risks impacting on Argyll & Bute
and the areas in which we can take action to address them:
Page 137

Page 138

Areas for Action
Infrastructure
Addressing demand and impacts of better transport
infrastructure to reduce reliance on private cars and
provide for those who do not have a car.
Enhancing communications and grid infrastructure
through maximising decarbonisation and renewable
energy opportunities.  
Natural capital: managing our green and blue
infrastructure to  reduce emissions and support
resilience.
Policy influence
Influencing national and regional public and non-public
policies through the CPP’s collective voice in a way that
recognises Argyll & Bute's distinctive geography and
population.
Procurement
and Supply Chain Collaboration
Promoting opportunities for climate mitigation,
adaptation and community wealth building through
improving circular economies within Argyll & Bute.
Risk/Economic
Assessment
Deepening our understanding of the risks and
opportunities, including economic risks and
opportunities, presented by climate change to Argyll and
Bute as a whole and to specific communities and
sectors.
Resilience/Carbon
Literacy Training
Promoting carbon literacy and greater resilience, across
all CPP sectors to empower individuals to bring about
climate mitigation, adaptation and resilience in an
inclusive and just way.
Skills
Development
Increasing opportunities for individuals to gain the skills
required to deliver climate mitigation, adaptation and
resilience in an inclusive and just way.
Other/crosscutting
Encourage individuals, communities and agencies to take
multiple actions and to identify new risks and
opportunities.
With fuel poverty nearly 50% higher than the Scottish average, and higher
again in more rural areas, and private water supplies ten times the national
average, our housing is largely insufficient to cope with our current climate
and even less with the greater weather extremes forecast.
Areas for action closest to the CPP’s remit and ability to control or influence:Page 138

Page 139

The principles and approach guiding the Strategy are:
An enabling strategy,  rather than creating new duties or replacing existing ones, it
identifies gaps and opportunities, especially those made possible by working together.
Alignment  with the CPP priorities of: Transport Infrastructure , Housing and Community
Wellbeing, which in turn are aligned to requirements in our national climate programmes.
Embracing diversity,  to recognise  significant variation among our communities, places
and landscapes, and that we are being affected by climate change in multiple ways.
Focussing on  common challenges across the region, such as the length and vulnerability
of transport links, and our low population density that can make it harder to secure
funding.
Adapting as we build  our understanding of the risks and opportunities we face, taking into
account local knowledge and also local variations and capacity to adapt.
In addition to incremental steps to reduce our
greenhouse gas emissions and transitional steps
to enhance our capacity to adapt, there is also a
transformational component: as we improve our
ability to cope with climate needs we also
improve our current circumstances.
An example of this sort of transformational
change is the importance of developing our local
economy through developing appropriate local
skills, produce and markets and the housing,
energy and other infrastructure to support
them. This reduces our transport and waste
emissions at the same time as reducing our
dependence on vulnerable, extended transport
links and enables us to add value locally and
reduce economic leakage, at the same time as
supporting transformational growth sectors
such as energy and valuing our natural capital.
Engaging communities through
networks of community
champions linked to Climate
Hubs centred on the four Argyll
& Bute administrative areas.
Developing resilience by
developing skills and capacity to
adapt to ongoing change
alongside longer term
transformational capital
projects.
Ensuring a socially just
transition to a climate ready
future: as we prepare for the
impacts of the changing climate
we do so in ways that are fair
and tackle inequality.
For more information please contact
Andy Macpherson
Climate Change Project Manager
Argyll Countryside Trust
andy@act-now.org.uk
act-now.org.uk/cpp
Page 139

Page 140

This page is intentionally left blank

Page 141

Sniffer, Edinburgh Climate Change Institute, High School Yards, Infirmary Street, Edinburgh EH1 1LZ, Scotland, UK, 
T: 0131 651 4674 E: info@sniffer.org.uk    W: www.sniffer.org.uk    : @SnifferScotland
Scottish Charity No SC022375, Company No SC149513. Registered in Edinburgh. Registered Office: Caledonian Exchange, 19a Canning Street, Edinburgh, EH3 8HE 
Argyll and Bute
Climate Trends Analysis 
September 2024
Page 141

Page 142

1https://themetoffice.maps.arcgis.com/apps/dashboards/506ff7d53c884badb0d8fd36d6280a91
2https://www.dynamiccoast.com/
3https://coastal.climatecentral.org/map/15/-
4.9542/55.988/?theme=water_level&map_type=water_level_above_mhhw&basemap=roadmap&contiguous=tr
ue&elevation_model=best_available&refresh=true&water_level=1.0&water_unit=m
Introduction 
This report sets out the approach to, and key findings from, analysis of climate observations and
trends from the Argyll and Bute region. 
The data used came from several sources. The main source of climate trends and projections
data came from the 2018 UK Climate Projections (UKCP18) User Interface data download site.
These data were supplemented with information from the Met Office Local Authority Climate
Explorer1. The analysis within this report was supported by using information from the Dynamic
Coasts platform2 and the Climate Central websites Coastal Risk Screening Tool that provides
maps of land below 1m above the current high tide line3. 
Given current emission pathways and the challenges in implementing the Paris agreement, the
RCP8.5 scenario was used in this analysis, representing a high-emissions scenario. This approach
is consistent with the emerging methodology of the 4th UK Climate Change. 
Projection data was analysed out to 2080, with sea level rise looked at to 2100. 
The analysis looked at Argyll and Bute at several spatial scales, including regionally (the river
basin region), the local authority boundary, and sixteen key settlements across the area. 
Methodology 
The approach taken to the data analysis for the climate trends and projections from Argyll and
Bute follows analysis undertaken by other Place-Based adaptation partnerships in Scotland such
as Climate Ready Clyde and Climate Ready South East Scotland. The overarching aim is to
understand the key observed climate trends in recent history in the area, and what the latest
climate models project as being experience between 2023 and 2080. 
The approach was adapted to suit the Argyll and Bute region and the following section sets out
the detailed methodology used and explains the reasoning behind the options selected for
scenarios, scale, metrics and variables. 
Data variables 
Spatial scales
Climate projections were looked at for three main spatial scales:
• The Argyll river basin region 
• The Argyll and Bute Local Authority area
• Settlements – sixteen key settlements across the region identified by the Climate
Change subgroup of the Argyll and Bute Community Planning Partnership. 
Page 142

Page 143

The UKCP data interface allows you to generate maps, plots and download the raw data for
various climate variables, RCP scenarios, geographical and temporal scales. However, not
everything is available at all scales, and whilst it is possible to generate maps for the full Argyll
and Bute region, the data can only be downloaded at either a “West Scotland” Administrative
Boundary scale, or at the Argyll river basin scale. The River basin omits a small part of the region
at the eastern side, but the data at this scale was more representative of Argyll and Bute than
the whole of West Scotland which also includes all of Ayrshire, D&G, Greater Glasgow and
Falkirk. 
Most data are available at a 2.2km scale, meaning that it is accessible for the settlements used
to generate graphs of trends. However, the maps generated by the UKCP user interface use the
regional level data and therefore do not show any more detail for the settlements than the
regional maps. Therefore, maps for the settlements have not been created. 
In addition to this, the data is not available for individual local authorities, and the maps again
show the same outputs as the regional maps, therefore trends and projections for the Argyll
and Bute local authority boundary have been generated using the Met Office Local Authority
Climate Explorer. 
Emissions scenarios
The analysis used the RCP8.5 projections. This is a high emissions scenario and meets the
recommendations of the CCRA UK Climate Change Risk Assessment to assess the risks for a 4°C
warming.   
RCPs, or Representative Concentration Pathways, are scenarios for the future concentrations of
greenhouse gases in our atmosphere (not emissions at that point in time) and cover a range of
assumptions around future population, economic development and impacts of actions to
mitigate greenhouse gas emissions towards international targets. 
Each pathway drives a different range of simulated global mean temperature increases over the
21st century and are used to model possible future climatic conditions. They range from a low
emissions scenario (RCP2.6) which models the future if global warming is limited to 1.6°C, to a
high emissions scenario (RCP8.5) which models the future climate if global warming reaches
4.3°C compared to the 1850-1900 baseline. 
The information from the Met Office Local Authority Climate Explorer, however, uses Global
Warming Levels (GWLs) rather than RCPs, with data provided for three future GWLs (1.5, 2, 4°C).
Whilst not exactly comparable, GWL4°C is an approximation of a lower level RCP8.5 scenario,
reaching a 3.5°C temperature increase by the 2080s. Therefore, information for GWL4°C has
been used for the local authority level analysis. 
Climate variables
Three key climate variables were looked at for all three spatial scales. They are:
• Annual mean air temperature (°C)
• Precipitation rate (mm/day)
• Sea level rise (only applicable to the settlements with a coastline.) 
In addition to this, seasonal data was looked at for the whole region, but not individual
settlements, due to the timescales involved in downloading and processing this data: 
Page 143

Page 144

• Summer mean air temperature
• Winter mean air temperature
• Summer precipitation rate
• Winter precipitation rate 
Temporal scales
All data were downloaded to 2080. Sea Level data were downloaded to 2100.   
Climate Change type
Regional data is also available in either absolute values or anomaly values. Absolute values
project the temperatures and precipitation rates that we are likely to see, whilst the anomaly
values show the percentage change from a chosen baseline. 
Absolute values were used for the majority of the analysis, as the observed trends from 1960
could be combined with the projections with ease, and it was felt that the graphs produced
from absolute values would be easier to understand for the audience of the adaptation strategy.
However, anomaly values were used also used to calculate the projected change in temperature
and precipitation rate in 2100 from 1961. 
Observational data 
To assist with analysing the projections in a context of experienced climate trends for the region,
observed data for mean air temperature and precipitation rate from 1961 – 2022 were
downloaded and incorporated into the projection data. 
Again, due to the timescales involved in downloading and processing the data, observation data
was only included for the annual mean air temperature and precipitation rate analysis for the
Argyll River basin region and the individual settlements. It was not looked at seasonally, though
that data is available should it be of interest at a later date. 
Outputs
Outputs are in the form of graphs, maps, and tables from the automatically generated reports
for the local authorities from the Met Office Local Authority Climate Explorer. 
Graphs showing the observed climate trends and projections against time have been produced
for the regional data and individual settlements. These have been produced either by data
manipulation in Excel, or automatically generated by the UKCP User Interface. 
Page 144

Page 145

Processing the data 
Data downloaded from the UKCP were processed in excel, with graphs of the climate trends and
projections produced for analysis. Observational data was incorporated into these graphs. 
The Met Office Local Authority Climate Explorer was accessed for the local authority specific
data, which can be viewed and explored using a web-based dashboard and automatically
generated reports downloaded with a summary of the information contained within. 
For areas not considered coastal by either of the data sources above, the Dynamic Coasts
website was used to suggest likely sea level rise by 2100 under the RCP8.5 scenario. 
Page 145

Page 146

Key Findings 
The analysis of current climate trends (1960 – 2022) in Argyll and Bute show that the average
annual air temperature has increased by 1.2°C during that time. Average summer temperature
has increased by 1.5°C with average winter temperature increasing by 1.2°C. Average annual
rainfall has increased by 400mm per year in that time, equating to an average extra 1.4mm per
day across the year. Summer rainfall has increased by 50mm per year since 1960, with winter
rainfall increasing by 300mm per year. Mean sea level around Argyll and Bute has risen by
approximately 6.8mm per year since 1990.   
The key findings of the climate projection is that the Argyll and Bute region will experience an
increase in average annual temperature of around 3.5°C and an increase in precipitation rate of
around 10% from the 1981-2000 baseline by 2080. Sea level is expected to rise by between 0.4
and 0.7m by the 2080s. 
There is a small amount of variation in these figures across the region, with individual
settlements providing a picture of those variations. 
Seasonal variation is also important to consider, as whilst the annual precipitation rate shows
only small amounts of change, the seasonal analysis shows a significant decrease in summer
precipitation with an increase in winter precipitation which almost balance each other out over
the course of a year. This seasonal variability is likely to have more of an impact on the region
as the annual changes given its geography, economics and infrastructure. 
Page 146

Page 147

Regional Findings 
Current observations
Monthly temperature and precipitation data from 1990 - 2022 were first analysed for Argyll and
Bute, to provide a context for the projected changes, particularly seasonally. This has been
plotted on the graph below. Perhaps unsurprisingly, the data confirms that temperatures are
warmer, and precipitation is less in the summer months than in the winter months.  
However, it also indicates that, generally, the driest months in Argyll and Bute are actually in
Spring – April and May. The largest change in precipitation is seen between September and
October, where on average, there is an increase of around 30mm. 
Average annual temperature and precipitation observations from 1960 – 2022 were also
plotted, along with seasonal (summer and winter) observations. Observed annual data shows
that the region has already experienced an average temperature increase of around 1.2°C and
an increase in precipitation rate of just over 1mm/day since 1960. 
Observed seasonal data shows that the region has already experienced an average temperature
increase in summer of around 1.3°C and an average temperature increase in winter of around
1.4°C. The region has also already experienced an average increase in winter precipitation rate
of over 3mm/day and a slight increase in summer precipitation rate of just under 1mm/day
since 1960. 
0
2
4
6
8
10
12
14
16
18
0
20
40
60
80
100
120
140
Jan Feb March April May June July Aug Sept Oct Nov Dec
Average Monthly Temperature (°C)
Monthly Average Rainfall (mm/month)
Monthly average observed data for Argyll and Bute river basin region
Page 147

Page 148

6
6.5
7
7.5
8
8.5
9
1960 1970 1980 1990 2000 2010 2020
Observed annual mean air temperature for the Argyll River Basin (°C)
1500
1700
1900
2100
2300
2500
2700
2900
3100
3300
1960 1970 1980 1990 2000 2010 2020
Observed total rainfall per year for the Argyll River Basin (mm)
4
5
6
7
8
9
1960 1970 1980 1990 2000 2010 2020
Observed annual precipitation rate for the Argyll River Basin (mm/day)
Page 148

Page 149

Another important note in the observed data, is the variability between years, as discussed in
the key findings summary above. Whilst both the observed data, and projections give an
indication of overall trends, the variability of both temperature and rainfall experienced in any
given year is very hard to predict and could have a bigger impact on the Argyll region than the
annual trends. 
Projected air temperature and precipitation rates 
Anomaly values (change from baseline):
The below graphs were generated using anomaly values directly in the UKCP User Interface. This
data shows change from a baseline of 1961 for the Argyll river basin up to the end of the century.
The bold line shows the central project of the 50th percentile i.e. as likely as not in the current
scenario. The shaded areas show the other relative percentiles of probability – from 5, 10, 25th,
75th, 90th and 95th. 
The graphs generated by the UKCP User Interface automatically uses an end date of 2099, where
as the data for absolute values (see section below) is only projected to 2080. Therefore, in order
to avoid confusion and compare the data, the interpretation of graphs for the anomaly values
below have looked at the 2080 date point. 
The first graph shows the annual average air temperature anomaly – the projected annual
temperature increase, indicating a probable increase of around 2.8°C by 2080 under a high
emissions scenario. 
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020
Observed summer mean air temperature for the Argyll
River Basin (°C)
0
1
2
3
4
5
6
1960 1970 1980 1990 2000 2010 2020
Observed winter mean air temperature for the Argyll
River Basin (°C)
2
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020
Observed summer precipitation rate for the Argyll
River Basin (mm/day)
2
4
6
8
10
12
14
1960 1970 1980 1990 2000 2010 2020
Observed winter precipitation rate for the Argyll
River Basin (mm/day)
Page 149

Page 150

The second graph shows the annual average precipitation rate anomaly – the projected annual
change in precipitation, indicating a probable increase of around 9%C by 2080 under a high
emissions scenario. 
Page 150

Page 151

As discussed above, precipitation is usefully looked at across the seasons. Therefore, the
following two graphs show the summer and winter average precipitation rate anomaly. These
graphs indicate a likely summer decrease in precipitation rate of around 20% by 2080 and a
winter increase in precipitation rate of 20% by 2080 under a high emissions scenario. These
appear to cancel each other out, so it can be anticipated that the projected annual increase in
precipitation rate will mean that spring and autumn will become wetter. 
Considering the current observed monthly precipitation shown in the graph in the Observed
Data section, an increase in autumn precipitation could have significant impacts given the
already high precipitation amounts from October onwards, and this would compound the
impacts of the increase in winter precipitation as the ground will already be saturated. An
increase in spring precipitation, may on the face of it have less of an impact, however, coming
on the back of an increase in winter rainfall (not snowfall, as the temperature increase will mean
precipitation falls mainly as rain) could have just as severe an impact on again, already saturated
ground. 
Absolute values:
Absolute values for both observation and projection data for average annual air temperature
and annual precipitation rates were plotted on the same graphs to compare the current trends
in climate since 1960 and what the climate models predicted would happen, along with the
future projections.  
Since 1960, the Argyll and Bute region has experienced an increase in average annual
temperatures of around 1.4°C, but with high levels of variability from year to year, as seen in
the graph below and above. Projections indicate that this increase will continue steadily on
reaching close to 11°C by 2080. 
The graphs also show that the projections fall slightly below the observed temperature from
1960 – 2022, and whilst some of this is down to the way the data is manipulated to get the
averages from the 12 different climate models, there is the suggestion that the projections have
previously underplayed the amount of warming currently being experienced. 
Page 151

Page 152

The graph above shows that the Argyll region has experienced a slight increase in annual
precipitation rate since 1960, but perhaps more importantly that there is a significant degree of
variability between years. The projections indicate that this increase will continue, though
perhaps slowly, reaching a little over 7mm/day by 2080. 
As with the observed data, and anomaly data, precipitation rate projections were looked at
seasonally (summer and winter). The below graphs show the observed and projected
temperature and precipitation rates in summer (June, July and August) and winter (December,
January and February) from 1960 – 2080. 
Seasonal temperature also shows an observed increasing trend across both summer and winter,
which carries on into the projections to 2080. Observed data shows a higher variability in the
winter temperatures which the projections do not, which is worth bearing in mind when
considering the impacts of the climate trends. 
6
7
8
9
10
11
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin average annual air temperatures from (°C)
Temperature Observations
Temperature Projections
4
5
6
7
8
9
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin annual average precipitation rate (mm/day)
Observed Precipitation Rate
Projected Precipitation Rate
Page 152

Page 153

Seasonal precipitation rates, however, show a different pattern between summer and winter,
with a steady decrease in summer and an increase in winter. The observational data again shows
a high degree of variability from year to year in precipitation rates, making patterns of overall
increases and decreases difficult to ascertain. 
10
11
12
13
14
15
16
17
18
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin average summer air temperatures (°C)
Summer temperature observations
Summer temperature projections
0
1
2
3
4
5
6
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin average winter air temperatures (°C)
Winter temperature observations
Winter temperature projections
2
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin summer average precipitation rate (mm/day)
Observed summer precipitation rate
Projected summer precipitation rate
Page 153

Page 154

Sea Level
Sea Level data is not available at the regional scale, it is projected at either specific tidal gauge
locations or 2km coastal locations. Sea level change will be covered in the local authority section
and where relevant in the settlement analysis below. However, looking at the RCP8.5 sea level
predictions for around the region, there is the projection that sea levels will arise around the
region on average between 0.30 and 0.71m by 2080, taking into account isostatic rebound
(gradual rise in land level formerly covered by ice sheets during the Ice Ages), and potentially
up to 1m by 2100 in some locations (not factoring in isostatic rebound). 
The available data only looks at sea level rise in isolation and does not include storm surges or
storminess. It is not currently possible to model and project changes in storm surges or
storminess with any accuracy, though they are predicted to increase due to the changes in
weather patterns expected in a changing climate. The data presented here could be interpreted
as a baseline which storm surges would be added to.  The Climate Central website Coastal Risk
Screening Tool referred to in the introduction provides maps of land below 1m above the
current high tide line, which can be used to infer the location of the mean high water line in
2100, though there are caveat around topography of surrounding land and existing and future
sea defences that will influence the exact level of sea rise in specific locations. 
The Atlantic Meridional Overturning Circulation (AMOC) is a large system of ocean currents in
the North Atlantic Ocean that bring warm water from the tropics up to the west coastline of
northern Europe, often called The Gulf Stream. It is a key reason why Scotland doesn’t see the
same temperatures as the Baltic Nations and Russia in winter. The AMOC varies from year to
year and though there hasn’t been enough monitoring to pick up long terms trends, climate
models suggest that the AMOC will weaken as greenhouse gases increase, which could have a
significant impact on the UK Climate as less warmer water is brought northwards. There is a
large amount of uncertainty of both the affect of a weaker AMOC and at present it hasn’t been
included in the UK Climate Projections due to a lack of robust data surrounding it. However,
this is being worked on by the Met Office and future Projections will hopefully include it. 
2
3
4
5
6
7
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Argyll River Basin winter average precipitation rate (mm/day)
Observed winter precipitation rate
Projected winter precipitation rate
Page 154

Page 155

Local Authority level Findings 
As mentioned in the methodology section, the High global Warming Levels used in the Met
Office Local Authority Climate Explorer roughly coincide with the RCP8.5 to 2080. 
The report for Argyll and Bute suggests an annual average temperature increase of 2.4 - 3.2°C
over the 1981-2000 baseline under the high emissions GWL, with the summer average at 4.7°C
higher and the winter average 2.5°C higher. These projections also project a summer maximum
temperature of 4.7°C above and a winter minimum temperature of 5.3°C above the 1981-2000
baseline. 
Summer precipitation rate is projected to be around 15% lower with winter precipitation
predicted to be around 10% above the 1981-2000 baseline. 
In addition to temperature and precipitation rate, the Met Officer Local Authority Climate
Explorer reports include other climate indicators. The report for Argyll and Bute predicts the
following median annual values, for the 4°C GWL: 
Indicator Baseline
(1981-2000)
4°C GWL
Median
Summer Days1 – daily maximum temperature >25°C 1 10
Hot Summer Days – daily maximum temperature >30°C 0 1
Extreme Summer Days – daily maximum temperature >35°C 0 0
Tropical Nights – daily minimum temperature >20°C 0 0
Frost Days – daily minimum temperature <0°C 52 7
Icing Days – daily maximum temperature <0°C 2 0
Growing Degree2 Days – daily mean temperature >5.5°C 1,249 2,005
Heating Degree Days – daily mean temperature <15.5°C 2,772 1,916
Cooling Degree Days – daily mean temperature <22°C 3 20 
For areas with a coastline, the Met Office Local Authority Climate Explorer also provides
projections on sea level. The report for Argyll and Bute projects a sea level rise of between 0.30
and 0.72m above the 1990 mean high tide line by the 2080s. 
1 Summer days above the stated temperature thresholds can occur at any time of year.
2 Degree days are not a number of days, but the number of degrees the daily average temperature exceeds the
threshold each day, added up over a year. 
Page 155

Page 156

Settlement Findings 
Argyll and Bute is a large area, with a diverse geography, topography and coastline. Sixteen key
settlements were identified by the CPP to allow the analysis of climate trends across the region.
There is a mixture of large and small urban centres, coastal, inland and island settlements,
landscape types and topographies: 
Page 156

Page 157

Arrochar 
Air temperature 
Average annual air temperature at Arrochar is predicted to increase over the coming decades,
reaching to approximately 10.5°C by 2080. This is in line with the UKCP anomaly projections
showing a 2.8°C increase in annual average temperature for the Arrochar area. 
Precipitation rate
Average annual precipitation rate in Arrochar is predicated to broadly stay steady compared to
the baseline, which compares to the UKCP anomaly projections suggesting a 5% increase in
precipitation rate for the Arrochar area. 
However, as noted in the regional section above, the variability of precipitation rate over the
year and between years will have a bigger impact on the climate risks experienced in a place.
The observational data below shows a high level of variability in precipitation rate between
years from 1960 – 2023. 
Sea Level Rise
6
7
8
9
10
11
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average air temperature at 1.5m at Arrochar (°C)
Observed temperature
Projected temperature
5
6
7
8
9
10
11
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Arrochar (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 157

Page 158

Despite being at the head of a sea loch, Arrochar is not considered as a coastal location by the
UCKP marine projections and therefore, sea level change data is not available. According to the
Dynamic Coasts High Emissions dashboard, however, a 0.9m sea level rise is anticipated at the
95% of the high emissions pathway RCP8.5: 
https://www.arcgis.com/apps/dashboards/defe901982154099b6ceb19db8aa41a4  (Note: it is
necessary to pan and zoom to the desired location after following the link, as below) 
Page 158

Page 159

Campbeltown 
Air temperature 
Average annual air temperature at Campbeltown is predicted to increase over the coming
decades, in line with the projections, reaching to approximately 13°C by 2080 This is in line with
the UKCP anomaly projections showing a 2.8°C increase in annual average temperature for the
Campbeltown area. 
Precipitation rate
Average annual precipitation rate in Campbeltown is predicated to broadly stay steady
compared to the baseline, though the projections suggest a higher precipitation rate than the
observed data currently shows as being experienced. The UKCP anomaly projections suggest a
10% increase in precipitation rate for the southern Kintyre peninsula, the variation between
that and the absolute values for Campbeltown could be due to the eastern location of the town. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average air temperature at 1.5m at Campbeltown (°C)
Observed temperature
Projected temperature
2
3
4
5
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate  at Campbeltown (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 159

Page 160

Sea Level Rise
Sea Level at Campbeltown is projected to rise by between 0.58m and 0.91m from the 2007
baseline by 2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated
sea level rise for the Argyll and Bute Local Authority area from the Met Office Local Authority
Climate Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections at Campbeltown (m)
RCP 8.5 (50th) RCP 8.5 (95th)
Page 160

Page 161

Dunoon 
Air temperature 
Average annual air temperature at Dunoon is predicted to increase over the coming decades, in
line with the projections, reaching to approximately 11.5°C by 2080. This is in line with the UKCP
anomaly projections showing a 3°C increase in annual average temperature for the Dunoon
area. 
Precipitation rate
Average annual precipitation rate in Dunoon is predicated to slightly increase compared to the
baseline. The UKCP anomaly projections suggest a 9% increase in precipitation rate for the
Dunoon area. 
The variability of precipitation rate over the year and between years, however, will have a bigger
impact on the climate risks experienced in a place, and the observational data below shows a
relatively high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average air temperature  at 1.5m at Dunoon (°C)
Observed temperature
Projected temperature
4
5
6
7
8
9
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average precipitation rate at Dunoon (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 161

Page 162

Sea Level Rise
Sea Level at Dunoon is projected to rise by between 0.55m and 0.91m from the 2007 baseline
by 2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated sea level
rise for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate
Explorer report. 
0
0.2
0.4
0.6
0.8
1
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 73 76 79 82 85 88 91 94
Sea Level Projections at Dunoon (m)
RCP 8.5 (50th) RCP 8.5 (95th)
Page 162

Page 163

Garelochhead 
Air temperature 
Average annual air temperature at Garelochhead is predicted to increase over the coming
decades, in line with the projections, reaching to approximately 11°C by 2080. This is in line with
the UKCP anomaly projections showing a 3°C increase in annual average temperature for the
area. 
Precipitation rate
Average annual precipitation rate in Garelochhead is predicated to broadly stay steady
compared to the baseline, though the projections suggest a higher precipitation rate than the
observed data currently shows as being experienced. The UKCP anomaly projections suggest a
9% increase in precipitation rate for the Garelochhead area, which could be accounted for in
the higher projections than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Garelochhead (°C)
Observed temperature
Projected temperature
3
4
5
6
7
8
9
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Gareloch (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 163

Page 164

Sea Level Rise
Garelochhead is not considered as a coastal location by the UCKP marine projections and
therefore, sea level change data is not available. According to the Dynamic Coasts High
Emissions dashboard, however, a 0.9m sea level rise is anticipated at the 95% of the high
emissions pathway RCP8.5: 
https://www.arcgis.com/apps/dashboards/defe901982154099b6ceb19db8aa41a4  (Note: it is
necessary to pan and zoom to the desired location after following the link, as below) 
Page 164

Page 165

Helensburgh 
Air temperature 
Average annual air temperature at Helensburgh is predicted to increase over the coming
decades, in line with the projections, reaching to approximately 11.5°C by 2080. This is in line
with the UKCP anomaly projections showing a 3°C increase in annual average temperature for
the Helensburgh area. 
Precipitation rate
Average annual precipitation rate in Helensburgh is predicated to broadly stay steady compared
to the baseline, which compares to the UKCP anomaly projections suggesting a 5% increase in
precipitation rate for the Helensburgh area. The projections do suggest a higher precipitation
rate than the observed data currently shows as being experienced. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Helensburgh (°C)
Observed temperature
Projected temperature
3
4
5
6
7
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Helensburgh (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 165

Page 166

Sea Level Rise
Helensburgh is not considered as a coastal location by the UCKP marine projections and
therefore, sea level change data is not available. According to the Dynamic Coasts High
Emissions dashboard, however, a 0.9m sea level rise is anticipated at the 95% of the high
emissions pathway RCP8.5: 
https://www.arcgis.com/apps/dashboards/defe901982154099b6ceb19db8aa41a4  (Note: it is
necessary to pan and zoom to the desired location after following the link, as below) 
Page 166

Page 167

Inveraray 
Air temperature 
Average annual air temperature at Inverary is predicted to increase over the coming decades,
in line with the projections, reaching to approximately 10.5°C by 2080. This is in line with the
UKCP anomaly projections showing a 2.7°C increase in annual average temperature for the
Inverary area. 
Precipitation rate
Average annual precipitation rate in Inverary is predicated to slightly increase compared to the
baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly projections suggest an 8% increase
in precipitation rate for the Inverary area, which could be accounted for in the higher projections
than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Inverary (°C)
Observed temperature
Projected temperature
4
5
6
7
8
9
10
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Inverary (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 167

Page 168

Sea Level Rise
Inverary is not considered as a coastal location by the UCKP marine projections and therefore,
sea level change data is not available. According to the Dynamic Coasts High Emissions
dashboard, however, a 0.91m sea level rise is anticipated at the 95% of the high emissions
pathway RCP8.5:
https://www.arcgis.com/apps/dashboards/defe901982154099b6ceb19db8aa41a4  (Note: it is
necessary to pan and zoom to the desired location after following the link, as below) 
Page 168

Page 169

Lochgilphead 
Air temperature 
Average annual air temperature at Lochgilphead is predicted to increase over the coming
decades, in line with the projections, reaching to approximately 11.5°C by 2080. This is in line
with the UKCP anomaly projections showing a 3°C increase in annual average temperature for
the Lochgilphead area. 
Precipitation rate
Average annual precipitation rate in Lochgilphead is predicated to broadly stay steady compared
to the baseline, though with a very slight increase. The UKCP anomaly data, however, suggests
that there could be an increase of up to 10%. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070
Average annual air temperature at 1.5m at Lochgilphead (°C)
Observed temperature
Projected temperature
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Lochgilphead (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 169

Page 170

Sea Level Rise
Sea Level at Lochgilphead is projected to rise by between 0.55m and 0.91m from the 2007
baseline by 2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated
sea level rise for the Argyll and Bute Local Authority area from the Met Office Local Authority
Climate Explorer report. 
0
0.2
0.4
0.6
0.8
1
1 11 21 31 41 51 61 71 81 91
Sea Level Projections at Lochgilhead
RCP 8.5 (50th) RCP 8.5 (95th)
Page 170

Page 171

Luing 
Air temperature 
Average annual air temperature at Luing is predicted to increase over the coming decades, in
line with the projections, reaching to approximately 13°C by 2080. This is in line with the UKCP
anomaly projections showing a 2.5°C increase in annual average temperature for the Luing area. 
Precipitation rate
Average annual precipitation rate in Luing is predicated to increased by over 1mm/day
compared to the baseline and the projections also suggest a higher precipitation rate than the
observed data currently shows as being experienced. This is in line with the UKCP anomaly
projections that show an anticipated increase in precipitation rate of 11%. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Avergae annual air temperature at 1.5m at Luing (°C)
Observed temperature
Projected temperature
3
4
5
6
7
8
9
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Luing (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 171

Page 172

Sea Level Rise
Sea Level at Luing is projected to rise by between 0.58m and 0.91m from the 2007 baseline by
2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated sea level
rise for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate
Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections at  Luing
RCP 8.5 (50th) RCP 8.5 (95th)
Page 172

Page 173

Oban 
Air temperature 
Average annual air temperature at Oban is predicted to increase over the coming decades, in
line with the projections, reaching to approximately 11.5°C by 2080. This is in line with the UKCP
anomaly projections showing a 2.6°C increase in annual average temperature for the Oban area. 
Precipitation rate
Average annual precipitation rate in Oban is predicated to slightly increase compared to the
baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly projections suggest a 9% increase in
precipitation rate for the Oban area, which could be accounted for in the higher projections
than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average mean air temperature at 1.5m at Oban (°C)
Observed mean temperature
Projected mean temperature
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Annual average precipitation rate at Oban (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 173

Page 174

Sea Level Rise
Sea Level at Oban is projected to rise by between 0.55m and 0.92m from the 2007 baseline by
2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated sea level
rise for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate
Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections at Oban (m)
RCP 8.5 (50th) RCP 8.5 (95th)
Page 174

Page 175

Port Ellen 
Air temperature 
Average annual air temperature at Port Ellen is predicted to increase over the coming decades,
in line with the projections, reaching to approximately 13°C by 2080. This is in line with the
UKCP anomaly projections showing a 2.8°C increase in annual average temperature for Islay. 
Precipitation rate
Average annual precipitation rate in Porth Ellen is predicated to slightly increase compared to
the baseline, and the projections suggest a slightly higher precipitation rate than the observed
data currently shows as being experienced. The UKCP anomaly projections suggest a 10%
increase in precipitation rate for Islay, which could be accounted for in the higher projections
than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Port Ellen (°C)
Observed temperature
Projected temperature
2
3
4
5
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Port Ellen (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 175

Page 176

Sea Level Rise
Sea Level at the Port Ellen tidal gauge site is projected to rise by between 0.59m and 0.94m
from the 2007 baseline by 2100, under the RCP8.5 high emissions scenario. This is above the
estimated sea level rise for the Argyll and Bute Local Authority area from the Met Office Local
Authority Climate Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections Port Ellen tidal guage site
RCP 8.5 (50th) RCP 8.5 (95th)
Page 176

Page 177

Rothesay 
Air temperature 
Average annual air temperature at Rothesay is predicted to increase over the coming decades,
in line with the projections, reaching to approximately 13°C by 2080. This is in line with the
UKCP anomaly projections showing a 3°C increase in annual average temperature for the Isle of
Bute. 
Precipitation rate
Average annual precipitation rate in Rothesay is predicated to broadly stay steady compared to
the baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly projections suggest a 8% increase in
precipitation rate for the Isle of Bute, which could be accounted for in the higher projections
than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Rothsay (°C)
Observed temperature
Projected temperature
2
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Rothsay (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 177

Page 178

Sea Level Rise
Sea Level at Rothesay is projected to rise by between 0.55m and 0.91m from the 2007 baseline
by 2100, under the RCP8.5 high emissions scenario. This is above the estimated sea level rise
for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate Explorer
report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Rise projections at Rothesay
RCP 8.5 (50th) RCP 8.5 (95th)
Page 178

Page 179

Tarbert, Kintyre 
Air temperature 
Average annual air temperature at Tarbert is predicted to increase over the coming decades, in
line with the projections, reaching to approximately 11.5°C by 2080. This is in line with the UKCP
anomaly projections showing a 2.9°C increase in annual average temperature for the north
Kintyre peninsula. 
Precipitation rate
Average annual precipitation rate in Tarbert is predicated to broadly stay steady compared to
the baseline. The UKCP anomaly projections suggest a 9% increase in precipitation rate for the
northern Kintyre peninsula. As with Campbeltown, some of this discrepancy could be due to
Tarbert’s location on the eastern side of the 25km grid square used for the anomaly projections. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
6
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Tarbert (°C)
Observed temperature
Projected temperature
2
3
4
5
6
7
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Tarbert (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 179

Page 180

Sea Level Rise
Sea Level at Tarbert is projected to rise by between 0.55m and 0.91m from the 2007 baseline
by 2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated sea level
rise for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate
Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Rise projections at Tarbert
RCP 8.5 (50th) RCP 8.5 (95th)
Page 180

Page 181

Tayvallich 
Air temperature 
Average annual air temperature at Tayvallich is predicted to increase over the coming decades,
in line with the projections, reaching to approximately 13°C by 2080. This is in line with the
UKCP anomaly projections showing a 3°C increase in annual average temperature for the
Tayvallich area. 
Precipitation rate
Average annual precipitation rate in Tayvallich is predicated to increase by around 1mm/day
compared to the baseline, though the projections suggest a higher precipitation rate than the
observed data currently shows as being experienced. This is in line with the UKCP anomaly
projections that show an anticipated increase in precipitation rate of 10%. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
13
14
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Tayvallich (°C)
Observed temperature
Projected temperature
3
4
5
6
7
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Tayvallich (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 181

Page 182

Sea Level Rise
Sea Level at Tayvallich is projected to rise by between 0.60m and 0.99m from the 2007 baseline
by 2100, under the RCP8.5 high emissions scenario. This is well above the estimated sea level
rise for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate
Explorer report. 
0
0.2
0.4
0.6
0.8
1
1.2
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea level Projections at Tayvallich
RCP 8.5 (50th) RCP 8.5 (95th)
Page 182

Page 183

Tighnabruaich 
Air temperature 
Average annual air temperature at Tighnabruich is predicted to increase over the coming
decades, in line with the projections, reaching to approximately 11.5°C by 2080. This is in line
with the UKCP anomaly projections showing a 2.9°C increase in annual average temperature for
the Tighnabruich area. 
Precipitation rate
Average annual precipitation rate in Tighnabruich is predicated to slightly increase compared to
the baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly projections suggest a 9% increase in
precipitation rate for the Tighnabruich area, which could be accounted for in the higher
projections than observations. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Tighnabruich (°C)
Observed temperature
Projected temperature
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Tighnabruich (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 183

Page 184

Sea Level Rise
Sea Level at Tighnabruich is projected to rise by between 0.55m and 0.91m from the 2007
baseline by 2100, under the RCP8.5 high emissions scenario. This is slightly above the estimated
sea level rise for the Argyll and Bute Local Authority area from the Met Office Local Authority
Climate Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections at Tighnabruich
RCP 8.5 (50th) RCP 8.5 (95th)
Page 184

Page 185

Tiree 
Air temperature 
Average annual air temperature at Tiree is predicted to increase over the coming decades, in
line with the projections, reaching to approximately 12.5°C by 2080. The UKCP anomaly
projections do not have a 25km grid square covering Tiree, so this data is not available for
comparison. 
Precipitation rate
Average annual precipitation rate in Tiree is predicated to slightly increase compared to the
baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly projections do not have a 25km grid
square covering Tiree. so this data is not available for comparison. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
13
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Tiree (°C)
Observed temperature
Projected temperature
2
3
4
5
6
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Tiree (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 185

Page 186

Sea Level Rise
Sea Level at Tiree is projected to rise by between 0.60m and 0.99m from the 2007 baseline by
2100, under the RCP8.5 high emissions scenario. This is well above the estimated sea level rise
for the Argyll and Bute Local Authority area from the Met Office Local Authority Climate Explorer
report. 
0
0.2
0.4
0.6
0.8
1
1.2
1 11 21 31 41 51 61 71 81 91
Sea level Projections at Tiree
RCP 8.5 (50th) RCP 8.5 (95th)
Page 186

Page 187

Tobermory 
Air temperature 
Average annual air temperature at Tobermory is predicted to increase over the coming decades,
in line with the projections, reaching to approximately 11.5°C by 2080. This is in line with the
UKCP anomaly projections showing a 2.5°C increase in annual average temperature for the
Tobermory area. 
Precipitation rate
Average annual precipitation rate in Tobermory is predicated to slightly increase compared to
the baseline, though the projections suggest a higher precipitation rate than the observed data
currently shows as being experienced. The UKCP anomaly data suggests an increase in
precipitation rate of 11% by 2080. 
The variability of precipitation rate over the year and between years will have a bigger impact
on the climate risks experienced in a place, and the observational data below shows a relatively
high level of variability in precipitation rate between years from 1960 – 2023. 
7
8
9
10
11
12
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual air temperature at 1.5m at Tobermory (°C)
Observed temperature
Projected temperature
3
4
5
6
7
8
1960 1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070 2080
Average annual precipitation rate at Tobermory (mm/day)
Observed precipitation rate
Projected precipitation rate
Page 187

Page 188

Sea Level Rise
Sea Level at Tobermory tidal gauge site is projected to rise by between 0.6m and 0.95m from
the 2007 baseline by 2100, under the RCP8.5 high emissions scenario. This is above the
estimated sea level rise for the Argyll and Bute Local Authority area from the Met Office Local
Authority Climate Explorer report. 
0
0.2
0.4
0.6
0.8
1
2007 2017 2027 2037 2047 2057 2067 2077 2087 2097
Sea Level Projections at Tobermory tidal guage site
RCP 8.5 (50th) RCP 8.5 (95th)
Page 188