Page 1

1   
Argyll and Bute Council: Education 
CONSULTATION REPORT 
Report on the outcome of the consultation relating to the proposal to close
Achaleven Primary School 
February 2024 
This document has been issued by Argyll and Bute Council in regard to a proposal
in terms of the Schools (Consultation) (Scotland) Act 2010 as amended.

Page 2

2   
CONTENTS 
1. Summary of the Proposal 3
2. Reasons for the Proposal 3
3. Introduction 3
4. Background 4
5. Equality and Socio-Economic Impact 5
6. The Consultation Process 6
7. Pupil Engagement 7
8 Responses to the Consultation Exercise 8
9. Education Authority Response to Written/Oral Representations 9
10. Education Scotland Report 10
11. Education Authority Response to Education Scotland Report 11
12. Rural Schools – Compliance with Section 9(1) of the Schools
(Consultation) (Scotland) Act 2010
12
13. Alleged Omissions or Inaccuracies 17
14. Opportunity to Make Representations to the Scottish Ministers 18
15. Conclusion 18
16. Recommendation 19 
Appendix 1 - Proposal Paper 
Appendix 2 - EQSEIA 
Appendix 3 - Written Consultation Response
Appendix 4 - Public Meeting Minutes 
Appendix 5 - Education Scotland Report 
Appendix 6 - Pupil Focus Group Responses

Page 3

3   
1. Summary of the Proposal 
1.1  It is proposed that education provision at Achaleven Primary School be
permanently discontinued with effect from 31st May 2024. 
1.2 The existing pupils residing within Achaleven Primary School’s catchment
area will continue to receive their education under existing arrangements.
If the proposal goes ahead, future enrolments from the Achaleven Primary
School catchment area would generally be educated at Lochnell Primary
School. 
1.3 The delineated catchment area of Lochnell Primary School shall be
extended to subsume the whole delineated catchment area of Achaleven
Primary School. 
2. Reasons for the Proposal 
2.1 The above is considered to be the best option to address the reasons for
the proposal which are: 
• Achaleven Primary School has been mothballed for over two years.
The school roll is currently zero, and is not predicted to rise
significantly in the near future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time the proposal was
adopted as a basis for statutory consultation (August 2023), there
were 16.29 fte (full time equivalent) vacancies for teachers and Head
Teachers in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. The annual cost of the mothballing
of the building is currently around £15,866. 
3. Introduction 
3.1 The purpose of this Report is to: 
• Provide a record of the total number of written responses made
during the statutory consultation period; 
• Provide a summary of the written responses; 
• Provide a summary of oral representations made at the public
meeting held on Wednesday 4th October 2023 at 6.00pm;

Page 4

4   
• Provide a statement of the Council’s response to those written and
oral representations;
• Provide the full text of Education Scotland’s report and a statement
of the Council’s response to this report; 
• State how the Council reviewed the proposal following the
representations received during the statutory consultation period
and receipt of the report from Education Scotland; 
• Provide details of any omission from, or inaccuracy in, the Proposal
Paper and state how the Council acted upon those; 
• State how the Council has complied with Sections 11A to 13 of the
2010 Act when reviewing the proposal; and 
• Explain the opportunity that may arise to make representations to
the Scottish Ministers in connection with Section 15(4) of the 2010
Act. 
4. Background 
4.1 On 10th June 2021, the Community Services Committee of Argyll and Bute
Council approved the mothballing of Achaleven Primary School. The
Council agreed that in the event there are no registered pupils by the
commencement of session 2022/23, the school be considered for formal
closure through the statutory process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListMeetings.aspx?CId=548&Year=0 
4.2 On 25th August 2022 the Community Services Committee agreed that the
Education Service would undertake the required preliminary consultation
and an Options Appraisal for Achaleven Primary School. 
https://www.argyll-
bute.gov.uk/moderngov/ieListMeetings.aspx?CId=548&Year=0 
4.3 A report providing details of the Options Appraisal, which was carried out
in accordance with Section 12A of the Schools (Consultation) (Scotland)
Act 2010 as amended, was tabled at the Community Services Committee
held on 9th March 2023, where the Committee agreed to note the outcome
of the preliminary requirements and requested that officers formulate a draft
closure proposal.  
https://www.argyll-
bute.gov.uk/moderngov/ieListMeetings.aspx?CId=548&Year=0

Page 5

5   
4.4 At the Community Services Committee held on 24th August 2023, Members
considered and agreed to adopt the draft proposal as a “relevant proposal”
that would proceed to a statutory consultation under the 2010 Act. This
statutory consultation opened on 31st August 2023 and concluded on 27th
October 2023. A public meeting was also arranged for Wednesday 4th
October 2023 at 6.00pm in Achaleven Primary School. 
https://www.argyll-
bute.gov.uk/moderngov/ieListMeetings.aspx?CId=548&Year=0 
4.5 Full details of the proposal, reasons for the proposal, the reasonable
alternatives to the proposal that were identified, an assessment of the
proposal and each of the reasonable alternatives, and an assessment of
the educational benefits to the proposal and each of the alternatives are
set out in the Proposal Paper, which is attached as Appendix 1. 
5. Equality and Socio-Economic Impact 
5.1 The Council as a public authority has a duty under the Equality Act 2010,
the Public Sector Equality Duty 2011, the Fairer Scotland Duty and the
Islands (Scotland) Act 2018 to have due regard to their provisions when
making strategic or financial decisions. This is done through assessing the
potential impact of the decision on equality through Equality and Socio-
Economic Impact Assessments (EQSEIAs). The full EQSEIA in respect to
the proposal to close Achaleven Primary School is attached as Appendix
2.  
5.2 The EQSEIA identifies that there could potentially be negative impacts on
mainland rural population, communities of place and interest. 
5.3 The proposed closure of Achaleven Primary School could adversely affect
the availability of local community volunteers. Lochnell Primary School, as
a larger school and with a larger catchment area, will afford increased
opportunities for volunteers and services to be involved and support the
school community. 
5.4 As the school has been mothballed for 2 years, there would be no impacts
on employees, and staff are benefitting from being in a larger school and
being able to work collaboratively.
5.5 Due regard has been taken in relation to these potential negative impacts
and further information relating to impacts and benefits can be found in the
EQSEIA (Appendix 2) and the Proposal Paper (Appendix 1).

Page 6

6   
6. The Consultation Process 
6.1 Following the Council’s decision of 24th August 2023, where it agreed to
adopt the proposal as a “relevant proposal” in terms of the 2010 Act and
issue it as a basis for consultation, the Proposal Paper was made available
on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
6.2 A summary of that document was also provided to: 
• The Parent Councils of the affected schools 
• The parents of the pupils at the affected schools 
• Parents of children expected to attend an affected school within 2
years of the date of publication of this Proposal Document 
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools 
• The teaching and ancillary staff at the affected schools 
• The trade unions representatives of the above staff 
• Argyll and Bute Councillors – Ward 5: Oban North and Lorn 
• Connel Community Council 
• Ardchattan Community Council 3 
• Dunbeg Community Council 
• Community Planning Partnership 
• Relevant users of the affected schools 
• The Constituency MSP 
• List MSPs for the area 
• The Constituency MP 
• Chief Superintendent, Police Scotland 
• Chief Executive, NHS Highland 
• Chief Executive Strathclyde Partnership for Transport (SPT) 
• Area Commander, Fire Scotland 
• Education Scotland 
6.3 Hard copies of the Proposal Paper were also made available for inspection
at the following locations: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS 
• Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF 
• Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA 
• Oban Library, 77 Albany Street, Oban PA34 5AL6.4

Page 7

7   
6.4 The document was available in alternative formats or in translated form for
readers whose first language is not English. 
6.5  If members of the public wanted the document in another language or
format, or if they required the services of an interpreter, this was made
available. 
6.6 Copies of the Proposal Summary (including a link to the full Proposal
Paper) were emailed to notify Education Scotland and all of the relevant
consultees (as prescribed by Schedule 2 of the 2010 Act) of the proposal
and invited them to make representations as part of the consultation
process. 
6.7  The consultation period ran from 31st August 2023 until the close of
business on 27th October 2023 – a continuous period in accordance with
Section 6(4) of the 2010 Act. 
6.8  A public meeting was held at Achaleven Primary School on Wednesday 4th
October at 6.00pm. Anyone wishing to attend the meeting and participate
was welcome to do so. Advance written notice of this meeting was given to
all the “relevant consultees” in terms of the 2010 Act. The meeting was
convened by the Education Authority who presented reasons for bringing
forward the proposal. There was an opportunity for questions to be asked
and comments to be made. 
6.9  This Consultation Report is the Education Service’s response to the issues
raised regarding the proposal during the consultation period. It will be
published on the Council’s website for a period of no less than 3 weeks
prior to final consideration of the proposal by the Council’s Community
Services Committee on 7th March 2024. 
7. Pupil Engagement 
7.1  The proposal to close Achaleven Primary School could have an impact on
pupils, parents and the community. Pupils’ views are a significant part of
the consultation process. In that regard, pupils that had attended Achaleven
Primary School prior to its mothballing and pupils that live in Achaleven
Primary School’s catchment area took part in focus groups with officers
from the Education Service to share their views on the proposal. 
7.2  The focus groups consisted of 19 pupils from Lochnell Primary School and
8 pupils from Dunbeg Primary School that live in the Achaleven Primary
School catchment area. These meetings were held on 29th September
2023 and 2nd October 2023 respectively. The Dunbeg focus group included

Page 8

8   
1 pupil who attended Achaleven prior to mothballing. A PowerPoint was
presented by an Education Service officer and pupils were given an
opportunity to give their views and have these recorded as part of the
consultation process. 
7.3  The pupils were given information regarding the Council’s proposal and
asked for their thoughts and ideas through a series of questions. 
7.4  Pupils in the focus groups, including the pupil who had previously attended
Achaleven said: 
• “Having more teachers (in current school) is better.” 
• “Lots of teachers, not just one teaching all day.”
• “Some people might like smaller schools.” 
• “There are lots of people to play with (in current school).” 
7.5  A summary of the pupil focus group responses is attached as Appendix 6. 
8. Responses to the Consultation Exercise 
8.1  There was one written response received during the consultation period
which was emailed to argyllhousereception@argyll-bute.gov.uk. The
written response was submitted by the chair of the Dunbeg Parent Council
and asked for consideration to increase the catchment area of Dunbeg
instead of Lochnell, or alternatively for pupils to continue to be zoned to
either Lochnell or Dunbeg Primary Schools. The full response can be found
in Appendix 3. Oral responses to the proposal were gathered at the public
meeting held at Achaleven Primary School on Wednesday 4th October
Three representatives from the local community attended along with
officers from the Education Authority. Also in attendance and Chairing the
meeting was Councillor Yvonne McNeilly, Education Policy Lead. Minutes
of the public meeting are attached as Appendix 4. One member of the
public present had been part of a small group looking to re-open the school.
She advised that the numbers in this group have since depleted to such an
extent that there was no longer opposition to the closure proposal from
them. The other two members of the public were from a local business, and
wanted to share their thoughts at the meeting on potential use of the
building for both their business, and as an asset for the community should
the proposed closure go ahead. 
8.2  The written and oral responses to the consultation can be grouped broadly
as follows:

Page 9

9   
• No views were given that Achaleven Primary School should re-open
for educational purposes.
• Views were expressed that consideration should be given to an
alternative realignment of the Achaleven Primary School catchment
area, in that it should be subsumed by Dunbeg Primary School. 
8.3  The Education Authority identified and assessed a number of reasonable
alternatives to the proposal in its Proposal Paper and as part of the
preliminary requirements. A further reasonable alternative to the proposal
was submitted as part of the public consultation process for pupils to be
able to be zoned to either Lochnell or Dunbeg Primary School. 
9. Education Authority Response to Written/Oral Representations 
9.1  Questions raised through the consultation process fell into two main
themes: community interest/use of the building and realigning catchment
with another school 
9.2  Community Interest/Use of the Building 
Question: Should the proposal be approved two local business
representatives who attended the public meeting expressed a view that
they would be interested in using the building for their business and, if there
is a desire from the community, to create a hub for community use. 
Response: Should the closure of the school be the ultimate outcome the
Council in the past have been favourable to community proposals but any
decisions wouldn’t be made until the future of the school had been decided.
If the community were to get in touch the council could commence interim
discussions about their plans. 
Question: The two local business representatives asked if the proposed
closure date could be brought forward should the decision be made to close
the school? 
Response: As this is a rural school closure, the proposed implementation
date of the 31st May 2024, which was set out in advance to all stakeholders
within the Proposal Paper, cannot be altered.

Page 10

10   
9.3  Realigning Catchment to Dunbeg Primary School 
Question: Dunbeg Primary School Parent Council Chair through a written
consultation response asked would the council consider increasing the
catchment area for Dunbeg instead of Lochnell? 
Response: The Proposal as consulted on was to close Achaleven Primary
School and realign its catchment area to Lochnell Primary School.
Realignment of the catchment area to Dunbeg Primary School was
identified as a reasonable alternative to the proposal, assessed previously
as part of the preliminary requirements of the 2010 Act (the Options
Appraisal). This alternative is reviewed further in Section 12 below. In
addition, the written consultation response further suggested a new
reasonable alternative to the proposal, in that pupils could continue to be
zoned to either Lochnell or Dunbeg primary schools. This new alternative
to the proposal is also further explored in Section 12, below. 
10. Education Scotland Report 
10.1  In accordance with Section 8(2) of the Schools Consultation (Scotland) Act
2010, a report was produced by Education Scotland on the educational
aspects of the proposal.  
10.2  In preparing their report, Education Scotland considered all relevant
documentation in relation to the proposal. They also met with children from
Oban High School who had attended Achaleven Primary School, and pupils
from Lochnell and Dunbeg Primary Schools to seek their views, as well as
other relevant consultees. 
10.3  The Education Scotland report is reproduced in full at Appendix 5. 
10.4  Education Scotland’s report supports the proposal and is summarised
below: 
a) Education Scotland agrees that the proposal by Argyll and Bute
Council will result in potential educational benefits for the
children in the Achaleven Primary School catchment area. This
includes more opportunities for them to learn, develop and
socialise with a wider group of their peers.
b) Education Scotland found that stakeholders were in agreement
with the closure proposal but stated that the council should
consider the alternative views from the consultation of the school
catchment alignment.

Page 11

11   
c) Education Scotland notes that should the Council decide to
implement the closure proposal, it should continue to engage
with the local community including children and young people to
consider the future use of the school building. 
11. Education Authority Response to Education Scotland Report 
11.1 The Education Service welcomes the report from Education Scotland and
agrees with its findings. 
11.2 The Education Service’s responses to the findings contained within the
Education Scotland Report are as follows: 
a. Education Scotland agrees that the proposal by Argyll and Bute
Council will result in potential educational benefits for the children
in the Achaleven Primary School catchment area. This includes
more opportunities for them to learn, develop and socialise with a
wider group of their peers. 
11.3 The Council agrees that the educational benefits for current and future
pupils are clear. Children benefit from enhanced transitions between
nursery and Primary 1 and also Primary 7 to S1. Children also benefit from
opportunities to work with a wider number of peers and children at other
stages, helping to develop social skills. The access to a range of
extracurricular activities is also a benefit that children experience at
Lochnell Primary School. There are also educational benefits that result
from school staff being a part of a larger staff group which enhances
opportunities for professional learning and moderation of children’s work.
Stakeholders have identified the strength of the educational benefits and
opportunities for pupils at Lochnell Primary School. 
b. Education Scotland found that stakeholders were in agreement
with the closure proposal but stated that the council should
consider the alternative views from the consultation of the school
catchment alignment. 
11.4 The views expressed by stakeholders to Education Scotland regarding
alternative re-alignments of Achaleven Primary School’s catchment area
following any closure, were also put forward to the Education Service in the
written consultation response that  was submitted (see Paragraph 8.1,
above, and Appendix 3). That written response proposes either closing
Achaleven Primary School and realigning its catchment area to Dunbeg
Primary School (which was one of the reasonable alternatives to the
proposal identified and assessed as part of the preliminary requirements).

Page 12

12   
It also proposes a new reasonable alternative to the proposal of closing
Achaleven Primary School and having pupils re-zoned to either Lochnell or
Dunbeg Primary Schools. The reasonable alternative, and new reasonable
alternative which have both been raised in this regard are further reviewed
in Section 12 of this Report. 
c. Education Scotland notes that should the Council decide to
implement the closure proposal, it should continue to engage with
the local community including children and young people to
consider the future use of the school building. 
11.5 The Council is open to engaging with the local community, and any other
interested parties, on any plans to develop a sustainable community facility;
and would encourage any interested parties to come forward with any
proposals in that regard. 
12. Rural Schools – Compliance with Section 9(1) of the Schools
(Consultation) (Scotland) Act 2010 
12.1  After the Education Authority received Education Scotland’s report, officers
carried out a further review of the proposal following the close of the
consultation, having regard (in particular) to: 
• Written representations received by the Authority (from any person)
during the Consultation period; 
• Views of Lochnell and Dunbeg Primary pupils as gathered during
the consultation exercise, 
• Oral representations made to it (by any person) at the public
meeting, and 
• Education Scotland’s report. 
12.2  The feedback from the Consultation was considered by officers. Data and
factual information was checked where required and advice sought from
other Council services where necessary. This ensured that the Council met
the requirements to review the proposal under Sections 9(1) and 13(5) of
the 2010 Act. 
12.3 One of the underlying reasons for the Proposal thus far has been, in
common with many other Scottish local authorities, the challenge of teacher
recruitment in Argyll and Bute. At the time the Proposal was issued as a
basis for statutory consultation (August 2023) there were 16.29fte
vacancies for teachers and head teachers in Argyll and Bute. Given that
this is a fluid figure, it has been reviewed and, as of the end of January
2024, it is now 10.84fte. This update shows that teacher recruitment

Page 13

13   
continues to be a challenge for the Council and an important factor to
consider in relation to the ability to staff all of our schools. 
12.4 In addition, officers carried out a further assessment of the proposal and
each of the reasonable alternatives to it as set out in the Proposal Paper,
having particular regard to the preliminary requirements for rural school
closures as set out in Section 12A of the 2010 Act.   
12.5 Option to Re-open Achaleven Primary School 
12.5.1 The school roll is currently zero, and there have been no enrolments
since mothballing. The school roll is not projected to significantly rise
in the near future. There would be considerable expenditure in
bringing the building up to standard and re-opening. There are also
significant challenges in recruiting teaching staff. When taking into
consideration the rural school factors, re-opening the school would
not in itself increase pupil numbers. Whilst the school re-opening
could allow community use of the school building outside school
hours, the Connell Village Hall is only a short distance away and is
currently used for community events. There was very little
community support for re-opening the school as part of the
consultation exercise. However, it was indicated that it would be
worthwhile to explore the re-purposing of the school building to
become a facility for the community. Formal closure of the school
would have to take place before any plans to that effect could be
progressed. Travel arrangements have been in place since
mothballing of Achaleven Primary School. Travel is an accepted
aspect of living in the local community. The re-opening of Achaleven
Primary School could have a positive impact for those pupils or staff
who can cycle or walk or there could be increased car usage by staff
needing to travel. But it is noted that the school roll is currently zero
and is not predicted to rise to a level which will make the school
viable again in the near future. These positive and negative impacts
may therefore balance. There are no specific educational benefits
from re-opening the school as all schools implement Curriculum for
Excellence ensuring effective learning and teaching matched to
children’s needs. Within current arrangements children are
benefitting from co-location of nurseries at Dunbeg and Lochnell
Primary Schools and the increased opportunities to socialise with a
wider peer group. With the continued lack of local support for re-
opening Achaleven Primary School, after reviewing the consultation
feedback, this is still not considered to be a reasonable option to
address the underlying reasons behind the proposal.

Page 14

14   
12.6 Option to Continue the Mothballing of Achaleven Primary School 
12.6.1 Those who responded to the consultation are keen to ensure a
future for the building if possible and felt that mothballing the school
for a prolonged period could potentially affect the sustainability of
the community. The school roll is not projected to significantly rise in
the near future. Achaleven Primary School has been mothballed
since August 2021 and whilst mothballed continues to deteriorate.
The current annual cost of mothballing the school is £15,866. There
is a cost for the Council minibus to transport the pupils to Dunbeg
Primary School. There is no additional cost to transport pupils from
Achaleven to Lochnell Primary School as West Coast Motors
service bus operates on an existing route and transports pupils to
the School. When taking into consideration assessment of rural
factors the continuing education of pupils at Dunbeg and Lochnell
Primary Schools would not change the current impact on the local
community, as these arrangements have been in place since
mothballing. Pupil numbers at Achaleven Primary School are not
expected to increase. While mothballed, the school building would
continue to deteriorate and would not be available for potential
community opportunities such as a community hub. There would be
no change to current travel arrangements. All schools implement
Curriculum for Excellence ensuring effective learning and teaching
matched to children’s needs. Within current arrangements children
are benefitting from co-location of nurseries at Dunbeg and Lochnell
Primary Schools and the increased opportunities to socialise with a
wider peer group. The building’s mothballing is not of benefit to the
community or the Council. Therefore continued mothballing would
still be viewed as not a reasonable option. 
12.7 Option to Close Achaleven Primary School and realign its catchment area
to Dunbeg Primary School 
12.7.1 Community feedback generally supports the closing of Achaleven
Primary School with potential for the school to be used as a
community asset. 
12.7.2 The written response to the consultation suggested closure of the
school but re-zoning of its catchment area to Dunbeg Primary
School, as opposed to Lochnell. 
12.7.3 There are no specific educational benefits from re-opening the
school as all schools implement Curriculum for Excellence ensuring
effective learning and teaching matched to children’s needs. Both
Dunbeg and Achaleven are very remote rural schools. Children from

Page 15

15   
the Achaleven area who attend Dunbeg Primary School are not
moving from a school that is completely different from their home
environment. At Dunbeg children benefit from increased
opportunities to socialise with a wider peer group. While the current
capacity of Dunbeg is 51% there is expected to be a significant rise. 
The projected increase in roll for Dunbeg Primary School is to be at
90% capacity by 2030. There would be no effect on current travel
arrangements for staff and pupils. The existing West Coast Motors
service to Lochnell includes no cost to the council compared to the
annual cost of providing transport to Dunbeg Primary School. With
the school roll at Dunbeg Primary projected to increase annually for
the foreseeable future and with continuing costs incurred for
transport of pupils from Achaleven to Dunbeg Primary school, the
closure of Achaleven Primary School and realignment of the Dunbeg
Primary School catchment area to include the current Achaleven
Primary School catchment would still be viewed as not a reasonable
option. 
12.8 Close Achaleven Primary School and realign its catchment area to Lochnell 
Primary School (the Proposal) 
12.8.1 Community feedback generally supports the closing of Achaleven
Primary School with potential for the school to be used as a
community asset. Formal closure of the school would mean any
plans for community use of the school premises could potentially be
progressed. The roll for Achaleven Primary School is currently 0 and
is not expected to rise significantly in the future. The current
occupancy rate for Lochnell is 80% with this predicted to fall slightly
in 2024/25. Travel arrangements have been in place since
mothballing and there would be no change to these current
arrangements for staff and pupils. Travel is an accepted aspect of
living in the Achaleven community. An existing West Coast Motors
bus service means that there would be no additional annual
transport costs. There are no specific educational benefits from re-
opening the school as all schools implement Curriculum for
Excellence ensuring effective learning and teaching matched to
children’s needs. Both Lochnell and Achaleven are very remote rural
schools. Children from the Achaleven area who attend Lochnell
Primary School are not moving from a school that is completely
different from their home environment. At Lochnell children benefit
increased opportunities to socialise with a wider peer group. After
further assessment of the proposal, the underlying reasons for it, the
consultation responses, and careful consideration of the rural school
factors, it has been assessed this would still be viewed as the most

Page 16

16   
reasonable option to address the underlying reasons for the
proposal. 
12.9 Close Achaleven Primary School and Extend the Catchment Areas of
Lochnell and Dunbeg Primary Schools 
12.9.1 This was a new reasonable alternative to the proposal raised by the
written response submitted to the consultation. 
12.9.2 A suggestion was made that if Achaleven Primary School were to
close, pupils should continue to be zoned to either Dunbeg or
Lochnell Primary Schools. 
12.9.3 This new reasonable alternative has therefore been assessed by
officers. It would not require any change to current travelling
arrangements, although capacities on school transport may have to
be monitored over time should this option proceed. 
12.9.4 However, in terms of impact on the community, the Education
Service consider that splitting the catchment between Dunbeg
Primary School and Lochnell Primary School would potentially have
the effect of splitting the Connel community. This was viewed as
officers as not being beneficial to pupils, families, or the local
community. For these reasons, the Education Service are of the
position that this would not be a reasonable or viable alternative to
the proposal. 
12.10 Officers of the Education Authority have listened carefully to the points
made at the public meeting and have considered equally carefully the
Education Scotland report and the written representations. As set out
above, the proposal has been reviewed to consider whether any of the
representations led the Council to reconsider any other options as being
reasonable alternatives to the proposal. 
12.11 The Educational Benefits were reviewed in respect of the Education
Scotland report and representations made. There were no factors included
in the Education Scotland report or representations made requiring any
aspect of the Educational Benefits to be reconsidered. Further
consideration was also given to the likely effect on the local community,
and the likely effect of any different travelling arrangements. Having
reviewed the Education Scotland report and feedback from consultees in
respect of the proposal and each of the reasonable alternatives, officers
concluded that the proposal continues to be the most appropriate response
to the underlying reasons for its formulation.

Page 17

17   
12.12  Officers concluded that the educational benefits of the proposal far
outweigh any potential disadvantages. Formal closure of the school will
allow plans to acquire the building to be progressed by the local community
and/or other interested parties, which in turn will increase the availability of
the premises to the community and even benefit the sustainability of the
community. The proposal will have a neutral impact on travelling
arrangements, as these have been in place since the mothballing of
Achaleven Primary School in 2021. The overwhelming majority of views
gathered as part of this consultation were not in support of the school being
re-opened for education provision. Education Scotland’s report is also
supportive of the Council’s proposal being implemented. 
12.13  Therefore, the Council has had regard to the points made at the public
meeting, the written consultation responses and Education Scotland’s
report. It thereafter carried out a review of the proposal and all the
reasonable alternatives and has concluded that the proposal remains the
best solution to address the reasons for the proposal as set out at Section
2 of this Report. Implementation of the proposal will allow children to have
access to increased learning opportunities, wider experiences and better
socialisation through being part of a larger school. If the school were to
remain mothballed this would be a continuing drain on the Council’s
resources. The proposal will assist the Council to deliver ‘Best Value’
through making more efficient and effective use of its resources.
Furthermore, the Council will follow up on working with the local community
and/or any other interested parties to explore options for future use of the
school premises, should they wish to progress this. 
13. Alleged Omissions or Inaccuracies 
13.1 Section 10(3) of the 2010 Act places a requirement on the Council to
provide details of any inaccuracy or omission in the Proposal Paper which
has either been identified by the Council or raised by consultees. This
provision also requires the Council to provide a statement on the action
taken in respect of the inaccuracy or omission, or if no action was taken, to
state that fact and why. 
13.2  In the course of the statutory consultation, there were no areas identified
by the respondents, or by the Council, as being inaccurate or omitted from
the Proposal Paper.

Page 18

18   
14. Opportunity to Make Representations to the Scottish
Ministers 
14.1  If the Education Authority makes a closure decision, it shall notify the
Scottish Ministers within 6 working days of that decision and publish the
fact that the Scottish Ministers have been notified, and that representations
can be made to them. The Education Authority would also be required to
publish a notice on its website of the decision to implement the proposal
and why it has been satisfied that closure is the most appropriate response
to the reasons for formulating the proposal. 
14.2  The Scottish Ministers will have a maximum of 8 weeks to call in any
closure decision made by the Education Authority in certain circumstances.
This 8 week timeframe would consist of an initial 3 weeks from the date of
decision, during which representations can be made to the Ministers, and
a further 5 weeks for the Scottish Ministers to decide whether to issue a
call in notice. During this period the Education Authority will not proceed to
implement any closure decision. 
14.3  If the Scottish Ministers call in a closure proposal, it is referred to the
Convener of the School Closure Review Panels. The Convener must
constitute a School Closure Review Panel within 7 days for determination.
The Education Authority may not implement a closure decision in whole or
in part until the Panel has made its determination. It will usually issue a
decision within 8 weeks of the Panel being constituted. 
14.4  If the School Closure Review Panel refuses to consent to the closure
decision, or following publication of the Consultation Report the Education
Authority decides not to implement the closure proposal, the Education
Authority cannot publish a further closure proposal in relation to the school
for 5 years, unless there is a significant change in the school’s
circumstances. 
15. Conclusion 
15.1  It is proposed that education provision at Achaleven Primary School shall
be permanently discontinued with effect from 31st May 2024; and the
catchment area of Lochnell Primary School shall be extended to subsume
the current catchment area of Lochnell Primary School. 
15.2  This is considered to be the best option to address the reasons for the
proposal which are:

Page 19

19   
• Achaleven Primary School has been mothballed for over two years.
The school roll is currently zero, and is not predicted to rise
significantly in the near future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. As of the end of January
2024, there are 10.84 vacancies for primary teachers and head
teachers in Argyll and Bute. 
• Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. The annual cost of the mothballing
of the building is currently around £15,866. 
16. Recommendation 
16.1  On the basis of the consultation responses received, Education Scotland’s
report, and having particular regard to the specific factors for rural school
closures, it is recommended that education provision at Achaleven Primary
School be permanently discontinued with effect from 31st May 2024; and
that the catchment area of Lochnell Primary School shall be extended to
subsume the whole delineated catchment area of Achaleven Primary
School.

Page 20

20   
APPENDIX 1 
Argyll and Bute Council             
Education 
PROPOSAL DOCUMENT:  August 2023 
Review of Education Provision 
Achaleven Primary School

Page 21

21   
Proposal for the closure of Achaleven Primary School 
SUMMARY PROPOSAL 
It is proposed that education provision at Achaleven Primary School be discontinued
with effect from 31st May 2024. 
The catchment area of Lochnell Primary School shall be extended to include the
current catchment area of Achaleven Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
• Achaleven Primary School has been mothballed for two years. The school roll
is currently zero, and is not predicted to rise significantly in the near future.
• Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 16.29 teacher and
head teacher vacancies in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance. The annual cost of the mothballing of the school
building is currently around £15,866. 
This document has been issued by Argyll and Bute Council in regard to a proposal
under the Schools (Consultation) (Scotland) Act 2010, as amended.  This
document has been prepared by the Council’s Education Service with input from
other Council Services.   
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals  
A summary of this document will be provided to:
• The Parent Councils of the affected schools
• The parents of the pupils at the affected schools
• Parents of children expected to attend an affected school within 2 years of
the date of publication of this Proposal Document
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools

Page 22

22   
• The teaching and ancillary staff at the affected schools
• The trade unions representatives of the above staff
• Argyll and Bute Councillors – Ward 5: Oban North and Lorn
• Connel Community Council
• Ardchattan Community Council
• Dunbeg Community Council
• Community Planning Partnership 
• Relevant users of the affected schools
• The Constituency MSP
• List MSPs for the area
• The Constituency MP
• Chief Superintendent, Police Scotland
• Chief Executive, NHS Highland
• Chief Executive Strathclyde Partnership for Transport (SPT)
• Area Commander, Fire Scotland
• Education Scotland 
A copy of this document is also available from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
• Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS
• Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF
• Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA
• Oban Library, 77 Albany Street, Oban PA34 5AL

Page 23

23   
This document is available in alternative formats or in translated form for readers
whose first language is not English. 
If you would like this document in another language or format, or if you require the
services of an interpreter, please apply to the Executive Director, Argyll and Bute
Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT.   
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w innym
formacie albo jeeIi potrzebna jest pomoc Uumacza, to prosimy o kontakt z
nami.

Page 24

24   
1 INTRODUCTION  
1.1 On 10th June 2021 Argyll and Bute Council approved the mothballing of
Achaleven Primary School. The Council agreed that in the event there are
no registered pupils by the commencement of session 2022/23 the school
be considered for formal closure through the statutory process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=142
18&Ver=4 
1.2 On 25th August 2022, the Community Services Committee agreed that the
Education Service would undertake the required preliminary consultation
and an Options Appraisal for Achaleven Primary School. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=147
84&Ver=4 
1.3 The Community Services Committee received a report on 9th March 2023
providing details of the Options Appraisal for Achaleven Primary School;
carried out in accordance with the preliminary requirements set out in
Section 12A of the Schools (Consultation)(Scotland) Act 2010, as
amended. The Committee agreed to note the outcome of this consideration
of the preliminary requirements and requested that officers formulate a draft
proposal for consideration at the meeting of the Community Services
Committee on 24th August 2023  which, if approved, would subsequently
trigger the formal consultation process under the Schools (Consultation)
(Scotland) Act 2010. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=150
32&Ver=4 
1.4 The statutory process for the closure of a rural school is laid out in the
Schools (Consultation) (Scotland) Act 2010 as amended by the Children
and Young People (Scotland) Act 2014. The Act, as amended, introduced
a presumption against closure of a rural school and details specific
requirements which the education authority is required to follow if they are
formulating a proposal to close a rural school. This includes the introduction
of certain preliminary requirements which must be satisfied prior to the
formulation of a proposal.

Page 25

25   
1.5 In addition, the Community Empowerment (Scotland) Act 2015 sets out a
new right for community organisations to request the transfer of local assets
into local community ownership/management. This may be something that
the Community wish to consider as part of or as a consequence of this
process. Public bodies including Councils must consider such requests and
make a decision within six months of receiving a valid request. 
1.6 Achaleven Primary School has had zero pupils enrolled since August 2021. 
1.7 There is a requirement to have special regard to the rural schools factors
prior to formulating a proposal to close a rural school. In particular it is
necessary to consider any reasonable alternatives before considering
closure. It is also necessary to consider the impact on the wider community
of a potential closure and the impact of any different travel arrangements.
These factors have been considered in the preliminary requirements which
were undertaken prior to this proposal being written. A full assessment of
the preliminary requirements is set out in the Options Appraisal, which is
attached as Appendix 5 
1.8 A new Corporate Plan (2023-2027) was agreed by the Council 29th June
2023. The Plan contains a new set of Council Priorities. The Argyll and Bute
Corporate Plan 2023-2027 states its vision of a successful and vibrant
Argyll and Bute with a growing population and thriving economy. The area
has a rich mix of remote, rural and island communities. The Council will use
its strong track record in partnership working, at all levels, to secure the
best possible outcomes. 
In the Corporate Plan for 2023-2027 through the agreed priorities, the will
ensure: 
• Children and young people will attain and achieve at all stages. We
will improve outcomes for our children and young people. 
• Our schools are effective, sustainable learning environments.
• Continued support for all of our children and young people with
additional support needs across Argyll and Bute, within our schools
and other service areas.
• We will support connections to, from and within Argyll and Bute.
• Recognition of the importance of marine connections to and from
our island and mainland communities and our role in maintaining
these links.
• We will reduce our carbon emissions.
• We seek to increase availability of all types of housing, including
affordable homes.
• We build up and strengthen our communities as attractive, vibrant
places to live, work and do business.
• We make assets work now while we plan for and invest in the future.

Page 26

26   
• We commit to working in partnership wherever we need to as well
as calling on others, with responsibility, to take action that is required
to safeguard Argyll and Bute’s success. 
1.9 The Council, as an Education Authority, has a statutory duty in terms of the
Education (Scotland) Act 1980 to make adequate and efficient provision of
school education across their entire area for the current school population
and future pattern of demand. This is reflected in “Our Children, Their
Future” which is the Education Vision and Strategy for Argyll and Bute
Council. 
2 PROPOSAL 
2.1 It is proposed that education provision at Achaleven Primary School be
permanently discontinued with effect from 31st May 2024. The catchment
area of Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. 
Reasons for this proposal 
2.2  This is considered to be the best option to address the reasons for the
proposal, which are: 
• Achaleven Primary School has been mothballed for 2 years. The school
roll is currently zero, and is not predicted to rise significantly in the near
future.
• Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
16.29 fte teacher and head teacher vacancies in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance. The annual cost of the mothballing of the
building is currently £15,866. 
Additional Considerations 
• The Council needs to allocate its resources in a way that ensures the
quality of all of its services; 
• This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future. This proposal
document contains an Educational Benefits Statement; 
• The costs per pupil in under-occupied schools are excessively high;

Page 27

27   
• Schools in the Council area are expensive to maintain and operate.
Retaining unnecessary accomodation is a serious drain on the resources
of the Council and diverts spending from areas that directly affect the
educational attainment of pupils; and 
• There is no realistic possibility at present of the Council being able to bring
its whole school estate up to a satisfactory condition. The present condition
is unsustainable and can only be improved by reducing the extent of the
estate. 
3 PRELIMINARY REQUIREMENTS 
3.1 The Council is required to consider the future of Achaleven Primary School,
as it has been mothballed for 2 years. The Council have considered the
reasons for making this proposal, and have also considered other viable
alternatives, the likely effects on the community and the likely effects of
different travelling arrangements as a consequence of this proposal.
Financial implications were also considered. Some of these figures have
been recalculated since the Options Appraisal was produced. 
3.2 The Council considered how the implementation of this proposal would
impact on the education of the children affected. The Council also
considered the impact on the children who currently live in the catchment
area but attend other schools, as well as children who may potentially live
in the catchment area in the future.   
3.3 The place of the school in the community was also considered, in terms of
the impact this proposal would have on the sustainability of the community
itself. Since its mothballing, the school premises has not been used for any
meetings or events, as these tend to be held in Connel Village Hall, a short
distance (approximately 300 yards) from the school. 
3.4 Impact on the environment was taken into account during the initial pre-
consultation process. This included a consideration of the transport
implications if this proposal was to be implemented. 
3.5 Four options were presented to the local community by the Council for
consideration during the pre-consultation phase, as required by section
12A of the 2010 Act.   
3.6 Of the four options which were considered by the community and the
Council; (d) is the option favoured by the Council, as it was considered it
most adequately addressed the reasons for the proposal. 
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with pupils zoned to either
Lochnell or Dunbeg Primary School,

Page 28

28   
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School.
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School (The Proposal). 
When considering the above options; the positive educational benefits of
Lochnell Primary School alongside the factors of projected low pupil
numbers, the challenges in recruiting teaching staff and the considerable
expenditure needed to bring the building up to standard at Achaleven
Primary School; in addition the lack of local support for reopening
Achaleven Primary School; option (d) was considered the most appropriate
response to the underlying reasons behind consideration of this proposal. 
3.7 Following from an initial Options Appraisal which was presented to the
Council’s Community Services Committee on 9th March 2023, it was agreed
that the preliminary requirements were satisfied enabling the draft proposal
to be formulated, with the option to close Achaleven Primary School and
realign its catchment area to Lochnell Primary School being identified as
the most adequate means of addressing the reasons for the possible
proposal.  
3.8 During the preliminary consultation regarding the future options for
Achaleven Primary School, there were a range of viewpoints gathered from
parents, young people and members of the community. 
3.9 The majority of the community were in agreement that the low numbers of
children did not make the re-opening of the school realistic. There was a
small percentage of people in support of continued mothballing in order to
retain the building in case of future need. The majority of the community felt
that it would be disappointing if the building lay empty and became derelict
and were keen to explore other options for the building should the school
close permanently. Parents of very young children expressed concern that
the school may be closed, but agreed this may be the best option when
projected numbers were clarified. 
3.10 Closing the school would have no impact on staff or pupil travel from the
current arrangement. There would be no alteration to the current travelling
arrangements or environmental impact.   
Alternatives to the Proposal 
3.11 The community engagement process prior to the drafting of this proposal
considered the views of members of the community and also considered
any other alternatives to the closure of Achaleven Primary School. Full
details from the community engagement and the findings from the
preliminary requirements, to include the alternative proposals are attached
as Appendix 5.

Page 29

29   
3.12 In conclusion, after the pre-consultation with the community, the Council
feels that the proposal to close Achaleven Primary School and realign its
catchment area to Lochnell Primary School is the most reasonable means
to address the underlying reasons for considering the future of Achaleven
Primary School. Further detail is provided in relation to educational
benefits, travel, environmental impact, community impact and financial
impact below. 
4 ASSESSMENT OF THE PROPOSAL 
4.1 It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochnell Primary School shall be extended to include the current catchment
area of Achaleven Primary School. (See Appendix 3.) 
4.2 Achaleven Primary School has been mothballed for two years. The school
condition will deteriorate with limited budgets for maintenance. The school
roll is currently zero and is not predicted to rise significantly in the near
future. The annual cost of the mothballing of the building has increased to
£15,866 since the Options Appraisal was produced. 
4.3 Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 16.29 fte
teacher and head teacher vacancies in Argyll and Bute. 
4.4 The Council needs to allocate its resources in a way that ensures the quality
of all of its services. 
4.5 This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future. 
4.6 The costs per pupil in under-occupied schools are excessively high. 
4.7 Schools in the Council area are expensive to maintain and operate. 
Retaining unnecessary accomodation is a serious drain on the resources
of the Council and diverts spending from areas that directly affect the
educational attainment of pupils. 
4.8 There is no realistic possibility at present of the Council being able to bring
its whole school estate up to a satisfactory condition. The present condition
is unsustainable and can only be improved by reducing the extent of the
estate. 
4.9 As part of the preliminary requirements in the drafting of this proposal, the
Council considered four options. The option favoured by the Council is (d),
as it was considered it most adequately addressed the reasons for the
proposal.

Page 30

30   
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with pupils zoned to either
Lochnell or Dunbeg Primary School,
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School.
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School (The Proposal). 
4.10 Having considered these alternatives the Council has made an initial
assessment that these are not viable alternatives to the proposal, and will
proceed to consult on the proposal to close Achaleven Primary School and
extend the catchment area of Lochnell Primary School. 
4.11 The Council has undertaken an appraisal on impact if this proposal was to
be implemented. This includes an assessment of: 
• The school roll and predicted school roll;
• Teacher numbers; and
• The condition of the building. 
4.12 The Council has carefully considered and reviewed the steps it has taken
to address the underlying reasons for the proposal (as outlined at Section
2.2, above), prior to formulating this Proposal Paper. 
4.12.1 In relation to the decline in the school roll, and no material increase
being predicted in the forthcoming years, the School was mothballed
two years ago as a result of a change to the School’s circumstances
– i.e. the school roll falling to zero as of August 2021. The Education
Authority therefore decided to mothball the school as a temporary
measure – in order to monitor the situation and assess whether there
was any likelihood of the school roll increasing to the extent that the
School became viable again in the near future. The mothballing was
subject to review at least annually and the Education Service
undertook to review the position should any further school age pupils
move into the catchment area and/or if they demonstrated a
sufficient level of demand for the School to justify its re-opening. As
mentioned above, the School has been mothballed for two years,
and its roll is not predicted to rise in the forthcoming years to a level
which would make the School suitable for re-opening. As there has
been no material change in circumstance evidenced, and having
kept the position under review via mothballing for two years, the
Education Service are of the view that matters should now move
forward in the form of a statutory closure consultation in order to
determine the future of Achaleven Primary School. This approach
aligns with that suggested by the Statutory Guidance for the 2010
Act, and Paragraphs 63-65 in particular. Further details in relation to
the School roll are set out at Section 5 of this Proposal Paper.

Page 31

31   
4.12.2 In relation to the underlying reason for this proposal in regards to
recruitment of teachers, the issues that have been faced by the
Education Service regarding the recruitment of teachers to
Achaleven Primary School are detailed at Section 6 of this Proposal
Paper. Since the School’s mothballing, in order to address this
particular issue, and prior to formulating this proposal, the Education
Service have offered a number of posts across the Authority area on
a permanent basis to a locality, rather than to a temporary school,
as an attempt to increase the likelihood of attracting a permanent
post. The Council has also entered into a strategic housing
agreement with social housing partners to support staff with
sourcing accommodation (which is a particular pressure in remote
areas of Argyll and Bute), as well as offering relocation packages.
Furthermore, the Education Service continues to work with UHI
Argyll to recruit more local candidates for teacher training.
Notwithstanding these efforts, the recruitment of teaching staff within
Argyll and Bute remains a considerable challenge, hence why it is
still a main underlying reason for this closure proposal. 
4.12.3 In relation to the underlying reason for this proposal concerning the
condition of the school premises, the school property will continue
to deteriorate whilst it remains mothballed. As mentioned at
Paragraph 4.12.1, above, there is currently no evidence to suggest
that the School will become viable for re-opening in the near future.
Whilst the School remains mothballed, it costs the Council £15,866
annually. Accordingly, the Education Service are now seeking
approval to proceed with a statutory closure consultation which, if
subsequently implemented, will allow the Education Service to use
any savings generated to the benefit of the other occupied schools
and pupils within the Education Authority’s area. It may also allow
for any plans for other uses of the School property to be progressed,
as it will need to be permanently discontinued as an educational
establishment in the first instance. Further information about the
condition of the School building and premises can be found at
Section 7 of this Proposal Paper 
4.13 The council has also undertaken an assessment of likely educational
benefits or effects which this proposal may have if implemented on: 
• The pupils of any affected school; 
• Any other users of the school’s facilities;
• Any children who would (in the future but for implementation) be
likely to become pupils of the school; and
• The pupils of any other schools in the Council area.

Page 32

32   
4.14 In addition, the Council has also considered how to minimise or avoid any
adverse educational effects that may arise from the implementation of this
proposal. 
4.15 The Council has also had special regard to the following factors if this
proposal was to be implemented, as Achaleven Primary School is classified
as a remote rural school. 
• Likely effect on the local community to be assessed by reference to: 
o The sustainability of the community; and
o Availability of the school’s premises and other facilities for
use by the school community. 
• Likely effect caused by different travelling arrangements by
reference to the effect caused by such arrangements on: 
o Environmental impact; and
o The schools pupils and staff and other users of the schools
facilities. 
4.16 Finally, the Council has also considered the financial implications of
implementation of the proposal and information on this is set out later in this
document. 
5 SCHOOL ROLL 
5.1 The information in relation to the school roll as shown below is drawn from
the yearly pupil census, which takes place in September each year. School
rolls by their very nature may fluctuate slightly on an ongoing basis due to
changes in pupil numbers as a result of pupils moving to and from the
catchment area. 
The school roll of Achaleven Primary School has seen a steady decline
since 2008: 
Table 2:  Achaleven Dunbeg  Lochnell
Capacity 41 174 147   
Roll Roll Roll
2008-2009 39 80 92
2009-2010 27 81 87
2010-2011 8 79 92
2011-2012 0 76 96

Page 33

33   
2012-2013 4 73 101
2013-2014 5 76 112
2014-2015 9 81 109
2015-2016 10 82 114
2016-2017 12 78 124
2017-2018 9 99 130
2018-2019 13 88 124
2019-2020 9 98 114
2020-2021 7 90 112
2021-22 0 88 119
2022-23 0 89 118 
Predicted Roll 
Table 3:  Achaleven Dunbeg  Lochnell
Capacity 41 174 147   
Roll Roll Roll
2023 -2024 0 125 116
2024 -2025 4 128 114
2025-2026 4 130 122     
* A prediction based on information available June 2023. 
5.2 In 2022 - 2023 there are 52 school aged children who live in the Achaleven
Primary School catchment area and who attend other schools. This
includes children within a cross boundary area with Achaleven Primary
School and those children who attend the denominational primary school
(St Columba’s Primary School) in Oban. 
5.3 There are currently 16 school aged pupils who live in the Achaleven
catchment area who attend Lochnell Primary School and 13 who attend
Dunbeg Primary School. 
5.4 Whilst there is a slight rise in the predicted school roll for the forthcoming
years, the historical trend has been for parents to make placing requests to
neighbouring schools. Those in the cross boundary area of Achaleven and
Lochnell Primary tend to send their children to Lochnell. This coming school
year there are 7 children (as at July 2023) from Achaleven catchment due

Page 34

34   
to start school in August 23. However, all of those families in the cross
boundary area have chosen Lochnell, and the remaining children will attend
other local schools by virtue of placing requests. 
5.5 The school roll is not predicted to rise significantly in the future. The area
around Achaleven is a small settlement and is not identified for growth in
the Local Development Plan: https://www.argyll-bute.gov.uk/ldp 
5.6 There is currently only one residential development within the             
Achaleven catchment area. 
6 TEACHER NUMBERS 
6.1 Teacher numbers are improving nationally, with a 6.3% increase in the
number of teachers nationally from 2016 - 2022. In Argyll and Bute there
has been a 3.1% reduction in the fte number of teachers from 2016- 2022 
6.2 As the school has been mothballed for two years, the issue of recruitment
of staff has not improved.  At the time of writing there are 16.29 fte teacher
and head teacher vacancies in Argyll and Bute. Despite a sustained effort
to secure permanent staff, there is no reason to think that staffing would
not continue to be a considerable challenge for Achaleven Primary School. 
6.3 At the current time, if the proposal was to be implemented, there would be
no impact on staffing levels at Lochnell Primary School. 
7 CONDITION OF THE BUILDING 
7.1 Argyll and Bute Council’s School Estate Management Planning process
identified in 2022 that the condition of Achaleven Primary School was
satisfactory and graded a B. 
7.2 The original costs for re-opening the building remain the same as the
Option Appraisal (See Appendix 5), the running costs of continuing to
retain the building whilst mothballed have considerably increased (See
Appendix 4). 
7.2 As part of the consultation process the Council would be open to discussion
with the community in regard to the future of the building. This might involve
the transfer of the property to a recognised community group through the
provisions of the Community Empowerment (Scotland) Act 2015 or some
other agreed mechanism. This may provide the community with an
opportunity to utilise the building as a driver for community benefit and
potential regeneration that could also enhance the sustainability of the
community.

Page 35

35   
EDUCATIONAL BENEFITS STATEMENT 
8 Assessment of likely educational benefits on pupils 
8.1 If this proposal is implemented, the Council believes that there will be
considerable educational benefits arising from this.  These centre around; 
• Learning and teaching;
• Meeting learners needs;
• Broadening the range of opportunities; and
• The environment for learning. 
8.2 This statement focusses on Lochnell Primary School, which is the school
the majority of pupils from the Achaleven Primary School catchment area
currently attend. 
8.3 The principles of Curriculum for Excellence recognise the professionalism
of teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools
are able to design their curriculum to meet the specific needs of their
children and community. There are no specific educational benefits from
reopening Achaleven Primary School as all schools implement Curriculum
for Excellence ensuring effective learning and teaching which is matched
to the needs of children. Continued attendance of pupils at other schools
allows children to experience a curriculum which is matched to their needs. 
8.4 Achaleven and Lochnell Primary Schools are remote rural schools. Each
school is set within a remote rural area (Scottish Government
classification). Although there are 52 school aged children in the Achaleven
Primary School catchment area, children from the Achaleven Primary
School catchment area who attend Lochnell Primary School continue to
benefit from education in a locality familiar to them, and still relatively close
to home. 
8.5 The co-location of the Early Learning Centre (ELC) and the primary classes
at Lochnell Primary School enables a strong transition process between the
ELC and school and includes joint early level learning every week. 
9 Learning and Teaching 
9.1 The curriculum includes a broad range of experiences which are planned
for children and young people through their education, to help every child
and young person to develop knowledge, skills and attributes for success
in learning, life and work. In Lochnell Primary School, children are
encouraged to be eager and active participants who are engaged, resilient

Page 36

36   
and highly motivated during their learning. Children know that their views
are sought, valued and acted upon. 
9.2 The learning environment encourages high level of achievement, providing
a wide range of opportunities for children to achieve their full potential within
the four contexts of learning. In Lochnell Primary School children may be
taught in classes composed of children from more than one year group.
Children benefit from being part of a social context in which they can build
relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with groups of children, take
part in team activities and move with their peers to secondary school. 
9.3 There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and outcomes of
curriculum for excellence. The National Improvement Framework priorities
include raising attainment for all, and closing the gap between the most and
least disadvantaged children. 
9.4 The principles of Curriculum for Excellence recognise the professionalism
of teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools
are able to design their curriculum to meet the specific needs of their
children and community. 
9.5 At Lochnell Primary School, staff are challenged and supported through a
range of continuous professional development and review opportunities
gained by working and learning with a range of colleagues. Lochnell
Primary School is part of the Oban, Lorne and the Isles Cluster, which
means that staff can be supported together, moderation and tracking of
pupil progress is enabled and staff work across stage appropriate groups.
Colleagues within Lochnell Primary School are able to support and
challenge each other on a daily basis. The whole staff are able to bring a
range of talents and skills to benefit outcomes for learners. 
9.6 Lochnell Primary School encourages nurturing and positivity. One aspect
of this work is a successful Buddy System. Children from different stages
work and learn together. This vertical support is particularly evident through
events such as sports day and during breaks and lunch when groups of
children are together in a social context. This system develops and benefits
both the ‘buddy’ and the ‘buddied’. This system works well and benefits the
wide range of children in the school. 
10 Meeting learners’ needs 
10.1 Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to reach
their potential. Careful tracking and monitoring procedures are in place to

Page 37

37   
evidence pupil progress. This includes professional dialogue with teachers,
learning discussions with children, classroom observations, assessment
and looking at pupil work.   
10.2 The school also has planned meetings and discussions with parents. 
These discussions between home and school improve parental
engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively with other
agencies and parents to ensure the needs of each child are met. In the
primary classes, standards of attainment have been maintained over the
last three years. Majority of children are achieving national expectations in
reading, writing, listening, talking and numeracy.  Health and Wellbeing
continues to develop within the Emotion Works programme which supports
positive behaviours and relationship within the school. 
10.3 The staff, parent body and partner groups also bring opportunities for
increased collaborative working. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced by
staff individual expertise e.g. PE, language, STEM, expressive arts
teaching. 
10.4 A ‘Respect Me’ policy is built into class lessons and permeates the whole
school ethos through assemblies and class work on rights and
responsibilities. The school has achieved its Bronze Nurture Award and is
working towards  the Silver Award, it is also working towards Rights
Respecting School accreditation 
11 Broadening the Range of Opportunities 
11.1 Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and physical
wellbeing both now and in the future. 
11.2 There is also a strong transition planning process between Lochnell
Primary School and Oban High School, which involves increased
opportunities for children to participate and to make new connections. 
11.3 Children are provided with a variety of experiences to develop their sense
of responsibility, independence, confidence and enterprising attitude. The
school has an active Pupil Council and ECO Group. 
11.4 Across the school children are engaged with learning and contribute well in
lessons. Staff promote positive relationships at all levels and also through
the Young Sports Leaders programme, the impact of this being that children
enjoy good relationships with their peers, young leaders feel confident and
entrusted to take these developments forward.

Page 38

38   
12 Environment for Learning 
12.1 Lochnell Primary School is a suitably-equipped and well supported school,
situated in Lochnell. The entire building is well maintained and along with
the surrounding scenery provides attractive accommodation for the
Lochnell Primary School. The school has an all-weather pitch adjacent to
the school, which is well utilised. The building has facilities for pupils and
visitors with special access needs. 
12.2 Any mitigating effects around the adverse weather and transport issues are
outweighed by the benefits of this proposal. 
12.3 In summary, there are a range of educational benefits for pupils if this
proposal was to be implemented, as summarised in the paragraphs above. 
There are benefits for the development of social and emotional skills, as
well as the educational benefits resultant from access to a more diverse
curriculum. The learning environment in Lochnell Primary School also
offers children the opportunity to participate in a wider range of active
learning strategies. 
13 Assessment of likely educational benefits on other users of the
school’s facilities 
Implications for staff 
13.1 If this proposal is implemented, there will be no new implications for
teaching and ancillary staff in Lochnell Primary School.   
13.2 If this proposal is implemented, the Council does not envisage any adverse
effects from the proposal in respect of staffing.  Should issues arise
however, these will be mitigated through the Council Educational
Management Team support structure. 
Early Learning Centre Users – Pre Five Children 
13.3 The co-location for the Early Learning Centre (ELC) and the primary
classes at Lochnell Primary School enables a strong transition process
between the ELC and the school and includes joint early level learning
every week. 
14 Assessment of likely educational benefits on any children who would
(in the future but for implementation) be likely to become pupils of the
school. 
Existing and future pupils

Page 39

39   
14.1 Children who may live in this catchment area in the future will benefit from
the broad range of educational opportunities which are presented through
this proposal, as detailed above. 
14.2 There would be positive educational benefits associated with this proposal.
The management arrangements of the school would be strengthened and
there would be opportunities for increasing the range of the curriculum and
increasing the use of active pedagogies.   
14.3 The proposal could increase the roll of Lochnell Primary School and would
thus extend the peer group for all pupils, present and future.  The larger
school should be able to support a wider range of social and extra-curricular
activities.   
14.4 Pupils who would otherwise have attended Achaleven Primary School,
would benefit from daily interaction in a larger peer group and from
improved educational arrangements as described above.  Pupils in the
combined school will have more shared experiences and opportunity for
friendships.  This will enhance their confidence and make the transition to
secondary easier.  Larger year groups make the provision of specialist
services more viable and provide enhanced opportunities for school trips.
Lochnell Primary School meets all the requirements of the Equality Act
2010. 
15 Assessment of likely educational benefits on the pupils of any other
schools in the Council area 
15.1 The current mothballing of the school has had an indirect effect on other
pupils in Argyll and Bute.  The reduction in the running costs for the school
means that this is a saving to the Council, which is not taken from
elsewhere. If Achaleven Primary School was to close, the current
mothballing costs being incurred would be re-directed and therefore
indirectly benefit other school pupils in Argyll and Bute. 
15.2 There are no other significant impacts from this proposal on other pupils in
the authority or who attend other schools, in either a positive or a negative
way. 
Placing requests 
15.3 This proposal will not affect the right of parents to request that their child
attend a school of their choice rather than the designated school in whose
catchment area the family lives as provided by the Education (Scotland)
Act 1980.

Page 40

40   
16 Consideration of how to minimise or avoid any adverse effects that
may arise from the implementation of this proposal 
16.1 The main adverse effect from this proposal would be the length of the
journey to school for children who live in the Achaleven Primary School
catchment area.  However, children who live in this catchment area and
attend Lochnell Primary School make this journey, and families in the area
engaged with thus far do not feel this is a major consideration. Funded
school transport would also continue to be provided for pupils should this
proposal be implemented. 
17 Summary of educational benefits statement 
17.1 Educational benefits of this proposal, such as the ability for children to
participate in a broad range of experiences, the development of the
strategic leadership of the head teacher in taking forward improvements in
learning and teaching, and the ability to meet the educational, social and
emotional needs of the children are significant benefits to this proposal.
During the pre-consultation phase, these benefits were explored in detail
and details from the community engagement and the findings from the
preliminary requirements, to include the alternative proposals and the
authority’s assessment of other likely effects of the proposal and the
reasons for that assessment are attached as Appendix 5 Options
Appraisal. 
17.2 Whilst the positive educational benefits are numerous, there is one
negative aspect identified which arises from the children attending Lochnell
Primary School.  This negative aspect is principally around the fact that
children have to travel by either bus or car to school.  However it is
considered that the positive aspects of this proposal outweigh the negative
aspect of some travelling for children. 
18 FACTORS FOR RURAL SCHOOL CLOSURES 
18.1 The Council has had special regard to the following factors in relation to
this proposal, as Achaleven Primary School is classified as a remote rural
school: 
The likely effect on the local community if this proposal is 
implemented 
18.2 The Council has made an assessment on the sustainability of the
community should this proposal be implemented and considers that this
may have a positive impact.

Page 41

41   
18.3 The Scottish Government focuses on four key areas of importance to rural
communities; 
• a strong and diverse rural economy, harnessing traditional strengths
and with an appetite for change,
• thriving rural communities where everyone can enjoy a decent quality
of life, where the young are not forced to leave their communities to get
on and where the vulnerable are no longer excluded,
• strong, community focused public services that are accessible, of the
highest possible quality and with the greatest possible choice,
• a rural Scotland whose natural and cultural heritage flourishes in all its
diversity 
18.4 In rural communities, the challenges and opportunities are largely defined
by the local area and can often best be met by a bottom-up, community-led
response. Strong community leadership is vital to articulating local priorities
and driving forward change and growth. 
18.5 There is the potential if this proposal is implemented to capitalise on the
existing will and drive in this community, with opportunities for local leaders
to enable them to organise, motivate and inspire their neighbours. The
opportunity for the local community to acquire this building would have a
positive impact on the sustainability for the village. 
18.6 Research1 has shown that when communities feel empowered, there is: 
• greater participation in local democracy;
• increased confidence and skills among local people;
• more people volunteering in their communities; and
• greater satisfaction with quality of life in the neighbourhood. 
18.7 The majority of people who attended the preliminary engagement event
stated that they would be in favour of preliminary work to investigate
whether the school building could be retained for community use and not
allowed to fall into further disrepair, as that would adversely impact on the
visual impact of the village. 
18.8 It is considered that formal closure of this school could have a positive
impact on the wider community, and might have potential to lead to an
increase in other users of the facility, which may lead to an improvement in
economic growth. 
1 https://www.gov.scot/policies/community-empowerment/

Page 42

42   
18.9 Indeed, the school closure may help to empower the local community
should the community wish to undertake an asset transfer process for the
building. This could have a positive impact on community sustainability.
Formal closure would mean that these plans could potentially be
progressed by the community, some of whom are already contemplating
ideas for future uses for the building. This may enhance community life by
giving a community enterprise focus. 
On the availability of the school’s premises and its other facilities for
use by the community 
18.10 During the pre-consultation phase, almost all members of the community
supported closure of the school with the suggestion that the building and
adjoining grounds could potentially be retained for community use. As
previously stated, Connel Village Hall is situated approximately 300 yards
from Achaleven Primary School and is used for village events. All people
who attended the pre-consultation meeting felt that the school building
should be retained for community use and not allowed to fall in to further
disrepair, as that would adversely impact on the aesthetic of the community. 
18.11 It is accepted that a school closure may have an adverse effect on a
community, but a community hub could be an asset to the community. If
any of the local community’s plans for the building were to progress, this
could have a positive impact on the sustainability of the community and in
particular the availability of the school’s premises and other facilities for use
by the community. Formal closure of the school would mean that these
plans could potentially be progressed by the community.   
The likely effect caused by any different travelling arrangements 
18.12 The travel distance from Achaleven Primary to Lochnell Primary is 3.6 miles
via the A85 and the A828. Travel time is approximately 8 minutes. Travel
arrangements have been in place for 2 years since the school was
mothballed. Travel is an accepted aspect of living in the Achaleven
community. 
18.13 Implementation of the proposal would have no effect on the current travel
arrangements of staff and pupils. The closure of Achaleven Primary School,
in terms of current travel arrangements would have a neutral effect. There
is no current annual transport cost for pupils to travel to Lochnell Primary
School as it is part of an existing West Coast Motors service bus route, and
therefore would not incur additional costs in the immediate future. 
18.14 It is anticipated that the effect on the travel arrangements of staff and other
users of the facility would not differ materially from that of the pupils.

Page 43

43   
Environmental impact 
18.15 Currently pupils travel to Lochnell Primary School from the Achaleven
Primary School catchment area, and there is a pre-existing West Coast
Motors service bus. Therefore, implementation of the proposal would have
a neutral environmental impact on the current position, and would have no
environmental impact on the current travel arrangements for staff. 
18.6 If this proposal was to be implemented there would be little or no further
impact on the natural environment. 
19 FINANCIAL IMPACT 
19.1 The full breakdown of the financial analysis is detailed in Appendix 4. This
information gives details on the estimated cost if Achaleven Primary School
was still to be an occupied and operational establishment. However, as
Achaleven Primary School is currently mothballed, the cost for the
mothballing is now estimated to be £15,866 per year. Should the school be
reopened, occupied and operational, the running costs per year are
estimated at £165,867 with the cost to bring the property to an acceptable
standard to re-open the school is £25,465. These latter two costs have not
changed significantly since the Options Appraisal (Appendix 5) was
produced. 
19.2 Column 2 of Table 1 at Appendix 4 shows the projected annual running
costs of Achaleven whilst Column 3 shows the additional impact on
Lochnell Primary as the receiving school.  The annual recurring savings (or
costs) are shown in Column 4. 
19.3 The main elements included within a school budget are teacher
employment costs (i.e. basic salary costs plus related employer’s National
Insurance and Superannuation contributions plus any relevant individual
allowances); Local Government employee costs and an allocation for
discretionary expenditure incurred by the school (i.e. educational
equipment, materials, staff travel, etc.). Teacher staffing budgets are
calculated on an annual basis and within the primary sector are determined,
taking cognisance of the SNCT class size maxima, by the number of
classes required to provide for the specific number and age of the pupils in
each school. When a school ceases to be operational the teacher staffing
budget is adjusted (at the appropriate time), per entitlement information
from Education HR, with the staffing budget resulting in a nil value. 
19.4 In line with the national priority of maintaining teacher numbers, the
Education Service operates on the basis that supernumerary teachers are

Page 44

44   
redeployed and therefore their salary costs still exist with an increase to the
receiving school’s budget. Some of the costs noted in column 3 of Table 1
will not directly impact on Lochnell Primary School but they will be a cost to
the Authority as a whole, for example the costs of maintaining the teachers
employed in Achaleven Primary School. 
19.5 There are currently no annual transport costs for pupils to attend Lochnell
Primary School. 
19.6 Table 2 contains the notional 30 year lifecycle costs that would arise based
on the GIA of the various schools irrespective of the number of pupils
accommodated. Lifecycle costs are representative of the cost needed to
keep the building in a good state of repair. The cost over the next thirty
years therefore to maintain Achaleven Primary School is £327,885 and for
Lochnell Primary School this is £1,060,969.
19.7 Table 3 contains the annual running costs during mothballing of Achaleven
Primary School. This estimate has increased to £15,866 per year. This
includes non-domestic rates, utility costs, insurances, etc. If the school was
to be formally closed, this would allow the Council to take steps towards
selling the school to a third party or local community. 
19.8 The transfer of pupils from Achaleven to Lochnell Primary School would
impact on the council’s Grant Aided Expenditure (GAE) allocation for
Achaleven Primary School Teaching Staff as there would be a reduction in
the Percentage of Primary Pupils in Small Schools.  This reduction is
estimated at £15,798. However Argyll and Bute Council is supported
through the floor mechanism so would not see a reduction in their overall
funding. 
20 EQUALITY AND SOCIO-ECONOMIC IMPACT 
20.1 The Council as a public authority has a duty under the Equality Act 2010,
the Public Sector Equality Duty 2011, the Fairer Scotland Duty (Part one of
the Equality Act) and the Islands (Scotland) Act (2018) to have due regard
to their provisions when making strategic financial decisions. This is done
through assessing the potential impact of the decision on equality through
Equality and Socio-Economic Impact Assessments (EQSEIAs).  
20.2 The Council will undertake the process of assessment during the
consultation process in respect of this proposal to ensure that due regard
is given to such matters in the decision making process. 
21 CONSULTATION ARRANGEMENTS 
21.1 Prior to formulating a rural school closure proposal under the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended, the

Page 45

45   
Education Authority must satisfy the preliminary requirements set out in
Section 12A of the 2010 Act. The Authority has previously identified its
reasons for formulating a possible proposal, considered whether there were
any reasonable alternatives to the possible proposal as a response to those
reasons,  and assessed each of the options in accordance with Section
12A(2)(c) of the 2010 Act. After considering a paper addressing these
preliminary requirements, the Education Authority decided on 9th March
2023 that, having specific regard to the reasons for formulating a
prospective closure proposal, the option to close Achaleven Primary School
and redraw its catchment area to Lochnell Primary School is the most
appropriate response to the specific reasons for the potential proposal. 
21.2 This document was considered by the Council as Education Authority on
24th August 2023 when it was agreed that it should be adopted as a relevant
proposal and issued as a basis for consultation.  No decision will be taken
by the Council on the proposal contained in this paper until after the end of
the consultation period. The Council will then receive a report on the
consultation and will reach a view on the proposal. 
21.3 A summary of this document will be issued free of charge to all of the
consultees listed on page 2 of this document and it will also be published
on the Council’s website:   
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
21.4 As part of a consultation process, the Education Authority must publish the
proposal paper, advertise it and notify Education Scotland and all of the
relevant consultees as prescribed by Schedule 2 of the 2010 Act, inviting
them to make representations on the proposal. The consultation period will
be from 31st August 2023 until the close of business on 27th October 2023
which lasts for a minimum of 6 weeks and includes at least 30 school days. 
21.5 A public meeting will be held at Achaleven Primary School on Wednesday
4th October 2023 at 6.00pm. Anyone wishing to attend the meeting and
participate is welcome to do so. The meeting will be convened by the
Education Authority and the Education Authority will present reasons for
bringing forward the proposal. There will be an opportunity for questions to
be asked and comments to be made. A note will be taken so that comments
can later be summarised and considered. However, the Education
Authority will also consider written responses which should be sent to
Education Services, School Consultations, Argyll & Bute Council, Argyll
House, Dunoon, Argyll, PA23 8AJ and should be received no later than
5.00pm on 27th October 2023. 
21.6 Written representations may be made on the proposal and the alternatives
to the proposal. Written representations may also suggest other
alternatives to the proposal. 
21.7 Following the close of the consultation, the Education Authority will provide
Education Scotland with copies of the written representations submitted, a

Page 46

46   
summary of the oral representations made at the public meeting and any
other relevant documentation. This will allow Education Scotland to prepare
a report on the proposal within a period of 3 weeks. 
21.8 After receiving Education Scotland’s report, the Education Authority will
then prepare and publish a Consultation Report in accordance with
Sections 9, 10 and 13 of the 2010 Act. The Education Authority will
thereafter make its final decision on whether to implement the proposal.
The decision will be made a minimum of 3 weeks after publication of the
Consultation Report. If the Education Authority makes a closure decision,
it shall notify the Scottish Ministers within 6 working days of that decision
and publish the fact that the Scottish Ministers have been notified, and that
representations can be made to them. The Education Authority would also
be required to publish a notice on its website of the decision to implement
the proposal and why it has been satisfied that closure is the most
appropriate response to the reasons for formulating the proposal. 
21.9 The Scottish Ministers will have a maximum of 8 weeks to call in any closure
decision made by the Education Authority in certain circumstances. This 8
week timeframe would consist of an initial 3 weeks from the date of
decision, during which representations can be made to the ministers, and
a further 5 weeks for the Scottish Ministers to decide whether to issue a call
in notice. During this period the Education Authority will not proceed to
implement any closure decision. 
21.10 If the Scottish Ministers call in a closure proposal, it is referred to the
Convener of the School Closure Review Panels. The Convener must
constitute a School Closure Review Panel within 7 days for determination.
The Education Authority may not implement a closure decision in whole or
in part until the Panel has made its determination. It will usually issue a
decision within 8 weeks of the Panel being constituted. 
21.11 If the School Closure Review Panel refuses to consent to the closure
decision, or following publication of the Consultation Report the Education
Authority decides not to implement the closure proposal, the Education
Authority cannot publish a further closure proposal in relation to the school
for 5 years, unless there is a significant change in the school’s
circumstances. 
22 CONCLUSION 
22.1 It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochnell Primary School shall be extended to include the current catchment
area of Achaleven Primary School. 
22.2 It has been assessed that the proposal is the most appropriate means of
addressing the underlying reasons for formulating it, which are:

Page 47

47   
• Achaleven Primary School has been mothballed for two years. The
school roll is currently zero, and is not predicted to rise significantly
in the near future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there
are 16.29 fte teacher and head teacher vacancies in Argyll and Bute. 
• Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. The annual cost of the mothballing
of the building is currently £15,866. 
Other Considerations 
• The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
• This proposal will bring educational benefits to all present and future users
of the affected schools and assist in ensuring that the Education budget is
more sustainable into the future; 
• The costs per pupil in under-occupied schools are excessively high; 
• Schools in the Council area are expensive to maintain and operate; 
• Retaining unessecary accomodation is a serious drain on the resources of
the Council and diverts spending from areas that directly affect the
educational attainment of pupils; 
• There is no realistic possibility at present of the Council being able to bring
its whole school estate up to a satisfactory condition. The present condition
is unsistainable and can only be improved by reducing the extent of the
estate. 
DOUGLAS HENDRY
Executive Director with responsibility for Education 
Councillor Yvonne McNeilly
Policy Lead for Education 
For further information, contact:                                                  
Wendy Brownlie 
Head of Education: Performance and Improvement
Wendy.Brownlie@argyll-bute.gov.uk

Page 48

48   
Rachel Binnie
Education Manager (Acting)
Rachel.Binnie@argyll-bute.gov.uk 
9th August 2023 
APPENDICES 
Appendix 1 -  Consultation Letter
Appendix 2 -  Response form
Appendix 3 -  Maps
Appendix 4 -  Financial template
Appendix 5 -  Options Appraisal

Page 49

49   
Argyll and Bute Council 
Comhairle Earra Ghàidheal agus Bhòid 
Executive Director: Douglas Hendry 
Kilmory, Lochgilphead, Argyll, PA318RT
Telephone: 01631 700045 Fax:  
Our Ref:  Ref:
e-mail: Rachel.Binnie@argyll-bute.gov.uk
Council Website:  www.argyll-bute.gov.uk 
Achaleven Primary School 
Dear Consultee, 
Review of Education Provision
Notice and Summary of Proposal for closing Achaleven Primary School
Schools Consultation (Scotland) Act 2010                             
Background 
Argyll and Bute Council, through its Education Service, aims to realise ambition,
excellence and equity for all.   
The Council is consulting on a proposal to close Achaleven Primary School. This
notice provides a summary of a proposal that you may have an interest in or are
required to be notified of, giving you key information about the proposal. 
The Council is conducting a public consultation process. This will commence on
31st August 2023 and will conclude on 27th October 2023. This is the period within
which you will be able to make written representations to the Council in respect of
the proposal.  If you wish your view to be taken account of in the consultation
exercise you must submit your written representation within this period. This
notice and summary provides further information on where a full copy of the
proposal may be obtained or referenced and also advises on how you can make
written representations to the Council. 
The Council will hold a meeting where officers will be able to provide information
on the proposal.  The details of the public meeting are contained in this notice and
summary. 
APPENDIX 1

Page 50

50   
It is important that everyone we are consulting tells us what they think of the
proposal. Please read this notice and summary and then consider the contents of
the proposal document. You can then tell us what you think of the proposal by
making written representation and/or by attending the public meeting. This notice
and summary tell you how to do that. 
The Proposal 
It is proposed that education provision at Achaleven Primary School be
discontinued with effect from 31st May 2024. The catchment area of Lochnell
Primary School shall be extended to include the current catchment area of
Achaleven Primary School. 
Reasons for this proposal 
This is considered to be the best option to address the reasons for the proposals
which are; 
• Achaleven Primary School has been mothballed for two years. The
school roll is currently zero, and is not predicted to rise significantly in
the near future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
16.29 fte teacher and head teacher vacancies in Argyll and Bute. 
• Whilst the school is mothballed, the building is deteriorating with
limited budgets for maintenance. 
The Council’s education strategy - Our Children Their Future 
Together we will realise ambition, excellence and equality for all. 
• Raise educational attainment and achievement for all,
• Use performance information to secure improvement for children and
young people,
• Ensure children have the best start in life and are ready to succeed,
• Equip young people to secure and sustain positive destinations and
achieve success in life,
• Ensure high quality partnership working and community engagement,
• Strengthen leadership at all levels. 
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary pre-
consultation stage of this process;

Page 51

51   
a) Re-open Achaleven Primary School,
b) Continued Mothballing of Achaleven Primary with the pupils zoned to
either Lochnell or Dunbeg Primary Schools,
c) Close Achaleven Primary School and realign its catchment area to
Dunbeg Primary School,
d) Close Achaleven Primary School and realign its catchment area to
Lochnell Primary School, (the Proposal). 
Written representations may be made on those alternatives as well as on the
proposal. 
Written representations on the proposal may suggest other alternatives to the
proposal. 
What will we do? 
We will consult with people by: 
▪ Providing a notice of the consultation and a summary of the proposal to
the relevant consultees this is that notice and summary
▪ Placing an advert in the local press
▪ Putting information on our website https://www.argyll-bute.gov.uk/school-
consultations-and-proposals
▪ Holding a public meeting to explain the proposal
▪ Ask parents, carers, children, young people, teachers, support staff and
others to tell us what they think of the proposals. 
What to do now? 
▪ Please read the full proposal document
▪ Please attend the Public Meeting which will be held on Wednesday 4th
October 2023 at 6.00pm in Achaleven Primary School. 
▪ Let us know what you think by:
Letter to: Education Services  
School Consultations  
Argyll & Bute Council  
Argyll House  
Alexandra Parade  
Dunoon      
PA23 8AJ 
Returning the attached response sheet by post or by; 
Email to:  argyllhousereception@argyll-bute.gov.uk

Page 52

52   
What next? 
Whilst the Council is engaging in a consultation process in relation to this proposal
that does not mean that the proposal will go ahead. It does mean that the Council
is engaging in a consultation process to seek your views on the proposal. 
All the points raised during the consultation will be carefully considered and
Elected Members will then decide if the plan should go ahead. 
If the suggestion goes ahead, any children from Achaleven Primary School
catchment area would be educated at Lochnell Primary School. Children already
attending Dunbeg Primary School would be able to continue at this school. 
Please note that this summary document is for convenience only.  Full details of
the consultation can be obtained from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ
• Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS
• Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF
• Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA
• Oban Library, 77 Albany Street, Oban PA34 5AL 
It is also available electronically via our website:
▪ https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Yours faithfully, 
Douglas Hendry
Executive Director with responsibility for Education

Page 53

53   
APPENDIX 2 
Argyll and Bute Council
Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access restricted to
Elected Members and Council Officers of Argyll and Bute Council. 
Proposal 
It is proposed that:
Education provision at Achaleven Primary School be discontinued with effect from 31st May 2024.
The catchment area of Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. 
This part of the form must be completed for a valid response:
Name: (please print) Address: 
Post Code:
I agree/do not agree (delete which does not apply) that my response can be made publicly
available
Signature: Date: 
YOUR INTEREST: (please tick) 
Parent 
Child / 
Young Person  Staff            Other  * 
Elected Member / MSP / MP    Member of Community Council 
*Other: (please specify) 
Please state your views on the proposal (continue overleaf if necessary)

Page 54

54   
APPENDIX 3 - MAPS 
MAP OF CURRENT PRIMARY SCHOOL CATCHMENT AREA 
The Map below shows the adjoining catchment areas of Achaleven and Lochnell and
Dunbeg Primary Schools: 
A – Achalaven Primary School
B- Lochnell Primary School
C – Dunbeg   Primary School 
B
A
C

Page 55

55   
APPENDIX 4 – FINANCIAL TEMPLATE 
Table 12 
Name of School
Achaleven Primary
Projected
annual costs
for full
financial
year 2023/24
Additional
financial
impact on
receiving
school 
Lochnell 
Primary
School 
Annual
recurring
savings
(column 2
minus
column 3)
School costs      
Employee costs -       
teaching staff 106,927  106,927
support staff 23,355  23,355
teaching staff training (CPD etc.)   0
support staff training   0
Supply costs  3,030  3,030     
Building costs:   
property insurance 1,948  1,948
non domestic rates 605  605
water & sewerage charges 142  142
energy costs 13,478  13,478
cleaning (contract or in-house) 549  549
building repair & maintenance 2,650  2,650
grounds maintenance 211  211
facilities management costs  0  0
revenue costs arising from capital   0
other - refuse collection; telephones 1,480  1,480        
School operational costs:      
learning materials 2,911 44 2,867
catering (contract or in-house) 9.055 361 8,694
SQA costs   0
other school operational costs (e.g.
licences) 544  544     
Transport costs:     
2 These figures have been calculated based on Achaleven Primary school roll the last full year prior to
mothballing.

Page 56

56   
home to school    0
other pupil transport costs 0 0 0
staff travel    0
SCHOOL COSTS SUB-TOTAL 166,884 405 166,479 
Income:      
Sale of meals -1,017 -291 -726
Lets   0
External care provider   0
Other     0
SCHOOL INCOME SUB-TOTAL -1,017 -291 -726     
TOTAL COSTS MINUS INCOME
FOR SCHOOL 165,868 114 165,754    
UNIT COST PER PUPIL PER
YEAR 23,695 14 20,719 
Table 2 
Capital costs
School
proposed for
closure 
Achaleven
Primary
Receiving
school 
Lochnell 
Primary
Capital Life Cycle cost  352,885 1,060,969
Third party contributions to capital costs   
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance   1,948
non domestic rates   605
water & sewerage charges   142
energy costs   7,412
cleaning (contract or in-house)   0
security costs   0
building repair & maintenance   1,950
grounds maintenance   211
facilities management costs 3,422
other 177

Page 57

57   
TOTAL ANNUAL COST UNTIL DISPOSAL 15,866 
Table 4 
Non-recurring revenue costs                
£3,800 
TOTAL NON-RECURRING REVENUE COSTS   
Table 5 
Impact on GAE - note 5  
The Primary Indicator determining the GAE allocation for Primary
School Teaching Staff is based on the number of primary school pupils
with the Secondary Indicator being the percentage of pupils in small
schools (roll < 70 pupils averaged over 2 years).  The additional pupils
from Achaleven will maintain the rolls of both Dunbeg and Lochnell
above the small school threshold.  There will be a loss of small school
GAE for those pupils attending Achaleven equating to approximately
£16k. 
Argyll and Bute Council, however, is supported by the floor
mechanism therefore any calculated reduction in GAE would not
have an actual impact on the overall GAE allocation.
15,798
GAE IMPACT 15,798

Page 58

58   
APPENDIX 5   
EDUCATION 
OPTIONS APPRAISAL 
ACHALEVEN PRIMARY
SCHOOL

Page 59

1.     INTRODUCTION 
1.1   On 10th June 2021, Argyll and Bute Council approved the mothballing of Achaleven Primary
School. The Council agreed that in the event that there are no registered pupils by the
commencement of session 2022/23 the school be considered for formal closure through the
statutory process.    
https://www.argyll-bute.gov.uk/moderngov/ieDecisionDetails.aspx?AIId=149205 
On 25th August 2022, the Community Services Committee agreed that the Education Service
would undertake the required preliminary consultation and an options appraisal, for
Achaleven Primary School. The Community Services Committee received a report presenting
and outlining details of a potential formal consultation under the Schools (Consultation)
(Scotland) Act 2010 (as amended) and a broad timeline of this process. 
https://www.argyllbute.gov.uk/moderngov/documents/g14780/Public%20reports%20pack%2
0Thursday%202
5-Aug-2022%2010.00%20Community%20Services%20Committee.pdf?T=10 
The statutory process for the closure of a rural school is laid out in the Schools (Consultation)
(Scotland) Act 2010 as amended by the Children and Young People (Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school and details
specific requirements which the education authority is required to follow if they are formulating
a proposal to close a rural school. This includes the introduction of a preliminary consultation
process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new right for
community organisations to request the transfer of local assets into local community
ownership/management. Public bodies, including councils, must consider such requests and
respond to them within a reasonable timescale.      
Achaleven Primary School has had zero pupils enrolled since elected members approved the
mothballing.   
On 25th August 2022, the Community Services Committee agreed that the Education Service
would undertake the preliminary requirements in relation to considering a rural school closure
and look at an options appraisal for Achaleven Primary School. This review will enable the
Education Service to identify and consider the options put forward.    
The 2010 Act makes special arrangements in regard to rural schools that is in effect a
presumption against their closure.  There is a requirement to have special regard to the rural
schools factors prior to formulating a proposal to close a rural school. In particular, it is
necessary to consider any reasonable alternatives before considering closure. It is also
necessary to consider the impact on the wider community of a potential closure (and all of
the reasonable alternatives) and the impact of any different travel arrangements. These
factors have been considered in this options appraisal.

Page 60

60                            
2.   REASONS FOR THE PROPOSAL 
2.1  An authority that is contemplating formulating a rural school closure proposal must satisfy the
preliminary requirements set out in section 12A of the 2010 Act before starting to prepare its
proposal paper. In particular, it must identify the underlying reasons why the future of the
School is being considered, which are as follows: 
1. Achaleven Primary School has been mothballed since August 2021. There were no pupils
registered at the school for session 2021/22 and the roll was not predicted to rise in the
near future. This continues to be the situation.  
2. Along with several other rural councils, Argyll and Bute is facing increasing challenges in
recruiting staff. In January 2023 there were 15.9 fte vacancies for both Head Teachers
and Teachers.  
3. Whilst the School is mothballed, the building is deteriorating with limited budgets for
maintenance. 
The Council is therefore considering the future of Achaleven Primary School. The various
options are explored within this paper. 
3.   BACKGROUND 
Argyll and Bute is an area of outstanding natural beauty sitting within an ancient landscape
with a strong cultural identity. Today, the culture of Argyll and Bute is reflected in its traditional
industries of fishing, farming and crofting, sports such as shinty and in its world class
musicians and artists as well as its modern commercial industries such as wind turbine
production and fish farming. 
Argyll and Bute is geographically the second largest authority in Scotland. Education is
delivered in a range of settings including schools, partnerships and youth services. 
3.1   Argyll and Bute Corporate Plan 
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of Scotland with
outstanding places, people and potential for a prosperous future for everyone. Our Council
along with our Community Planning Partners, is committed to ensuring that Argyll and Bute’s
Economic Success is built on a Growing Population. 
This strategic approach embraces the vision for our area, our communities and our people
as outlined in the Corporate Plan. Our key service priorities support the delivery of our
commitments in the plans, helping to focus on local outcomes that will achieve meaningful
improvements for the area, our local communities and our citizens.    
Councils have a statutory responsibility in terms of the Local Government in Scotland Act
2003 to achieve best value. Our Community Services Asset Management Plan provides a
review of the property assets used to deliver services. It incorporates the School Estate
Management Plan which reflects the local implementation of Building Better Schools:

Page 61

61  
Investing in Scotland’s Future, the national school estate strategy developed by the Scottish
Government in conjunction with local authorities.    
The aspirations, guiding principles and objectives contained within Building Better Schools
are reflected throughout Education and Children’s Services Asset Management Plan (SAMP)
for schools and public buildings, both in the management of the existing assets and in the
design and construction of developments.    
3.2   Our Children Their Future 
Councils, as an Education Authority, have a statutory duty in terms of the Education
(Scotland) Act 1980 to make adequate and efficient provision of school education across their
entire area for the current school population and future pattern of demand. This is reflected
in Our Children, Their Future: Education Vision and Strategy. 
3.3   Achaleven and the Local Area - the Achaleven Primary School Setting 
Achaleven Primary School is situated in the village of Connel, 5 miles north of Oban. Connel
is a small and picturesque village situated on the southern shore of Loch Etive and sits at the
end of Connel Bridge, a striking cantilever bridge which spans the sea-mouth of the Loch and
was built in 1903 to take the railway line to Fort William. Today it supports the main A828 into
Benderloch.  Achaleven Primary School sits within grounds between the A85 and Loch Etive.   
3.4   The School within the Community 
Achaleven Primary School was at one time, active within the community. The pupils invited
the community to attend events during the year. However, as the school roll diminished,
attendance at events decreased.  Whilst being mothballed, the school is not used for any
meetings or events, as these tend to be held in Connel Village Hall, a short distance (330
yards) from the school.    
3.5   Previous Mothballing and Re-Opening 
In April 2011, two papers proposing the amalgamation of Achaleven Primary School with
either Dunbeg Primary School or Lochnell Primary School were taken to a special meeting
of Argyll and Bute Council. This resulted from the fact that Achaleven Primary School had
suffered a decrease of 52 pupils in its roll over the period (2005 – 2011), this was a decline
of 83% in the occupancy rate over the same period and the projected roll for 2011/12 was 8
pupils. Following this, Achaleven Primary School was mothballed from June 2011 to August
2012. Achaleven Primary School re-opened with four Primary 1 pupils in August 2012, as a
result of the Education Authority determining that the school had become viable again,
following a review of the mothballing. 
https://www.argyll-bute.gov.uk/moderngov/ieListDocuments.aspx?CId=257&MID=4611 
3.6   Population 
Argyll and Bute has an average population density of just 0.13 persons per hectare. This
coupled with the changing demographic profile of the area presents one of our greatest
challenges. The table below refers directly to the Achaleven area showing the changing
population from census 2001 to census 2011:

Page 62

62  
Table 1: Population Information 
Achaleven Area Census   
2001  2011 
Total Resident 
Population 
135  Total  Resident 
Population 
129 
% under 16  17.77  % under 16  21.7 
% 16 – 64 (pensionable
age) 
54.81  % 16 – 64 (pensionable
age) 
62.0 
%  pensionable age and
over 
27.41  %  pensionable age and
over 
16.2 
It is recognised that the census area and the catchment area of Achaleven Primary School
differ slightly.    
3.7   Development and House Building 
The current Local Development Plan (LDP2) was adopted in 2019. This sets out planning
and development proposals for the next 10 years from 2020 and a vision for 20 years.  The
Argyll and Bute Local Development Plan provides the local planning framework for the
Council area, excluding the Loch Lomond and Trossachs National Park area. The Plan is
divided into the written statement and proposals maps. The written statement provides the
general policy context against which planning applications for new development proposals
should be assessed. This is supported by the proposals maps which show the range of
development opportunities and constraints within the area, for example: 
• the key development areas i.e. the allocations for housing, industry and business,
community facilities and infrastructure; 
• the potential areas for future development (Potential Development Areas); 
• areas requiring actions such as environmental improvement or regeneration (Areas for
Action); and 
• environmental designations such as national Scenic Areas, Sites of Specific Scientific
Interest (SSSIs), Special Protection Areas and Local Nature Conservation Sites. 
Appendix 1 shows the LDP for Achaleven/Connel.  
Appendix 2 provides the key for Local Development Plans. 
3.8   Achaleven Primary School 
Achaleven Primary School, in Connel, is a non-denominational school situated on the main
A85 Glasgow to Oban road, by the Connel Bridge. The school serves the village of Connel
and its surrounding area from Achnacloich in the east to Dunstaffnage House in the west.
The main accommodation, which is over 100 years old, contains two classrooms, toilets,
staffroom, office, two resource storage areas, and display areas. There is a detached annexe,
which is used as a third classroom and a dining room where School meals are served. Pupils
have access to either a grass or a tarmac play area. 
Appendix 3 shows the Achaleven Primary School Floor Plan.

Page 63

63  
Achaleven Primary School is 2.8 miles from Dunbeg Primary School and 3.6 miles from
Lochnell Primary School. 
The Scottish Government’s Rural School List (October 2021) classifies Achaleven Primary
School as ‘very remote rural’.  This is defined as an area with a population of less than 3,000
people, and with a drive time of over 60 minutes to a settlement of 10,000 or more. Achaleven
Primary is one of 21 primary schools associated with Oban High School. 
3.9   Dunbeg and Lochnell Primary Schools 
Following the mothballing of Achaleven Primary School, parents/carers have the choice to
send their children to either Lochnell or Dunbeg Primary Schools.    
Appendix 3 shows the Achaleven Primary Floor Plan 
Appendix 4 shows the Lochnell Primary and ELC Floor Plan Appendix
5 shows the Dunbeg Primary and ELC Floor Plan 
Lochnell Primary School is a non-denominational and co-educational school situated in the
village of Benderloch on the main Oban to Fort William road. The building is single storey
and was opened in 1992. The teaching bays in the original building are semi open plan. The
new extension teaching bays are open plan. The entire building is well maintained and along
with the surrounding scenery provides attractive accommodation for the primary school.
Lochnell Primary School has capacity for 147 pupils.    
A joint school and community project was completed to provide and maintain an all-weather
pitch adjacent to the school. The pitch is used very well by the school every day. The
community have access to the pitch out-with school times and the public can book it at the
local garage. 
The building has facilities for pupils and visitors with special access needs. The school has
very good links with Oban High School as their associated secondary school. Lochnell
Primary has a Pre5 Unit within the school for 3 and 4 year olds. 
Dunbeg Primary School is a non-denominational and co-educational school situated in the
village of Dunbeg approximately three miles from the town of Oban. It is a single storey
building originally opened in 1960 and has an extension to facilitate community activities.
Recent additions include toilet/shower facilities for children with additional needs. Facing west
are five classrooms and hall with large windows that provide a bright and pleasant working
atmosphere. In front is a split-level play area with garden and netball court. 
To one side is a games field and to the other a well-equipped play park for younger children.
With capacity for 174 children of all denominations from P1-7, it also provides preschool
education with spaces for 20 3–5 year olds. The school has very good links with Oban High
School as their associated secondary school. 
The Scottish Government’s Rural School List 2021 classifies Achaleven, Dunbeg and
Lochnell Primary Schools as ‘very remote rural’. Oban High School is the associated
Secondary School for all three primary schools.

Page 64

64  
The Map below shows the adjoining catchment areas of Achaleven and Lochnell and Dunbeg
Primary Schools Catchment Areas: 
3.10  Pupil Numbers 
Pupil projections, and data for 2023-24 are based on the 2022 pupil census, a return prepared
annually for the Scottish Government. Past pupil numbers are historic data from past pupil
censuses. Pupil projections for future P1 intakes are currently based on the 3 year average
intake figure.  Historical data shows that from 2014-2020, an average of 5 placing requests
were made to schools out-with the Achaleven Primary School catchment area. This had a
significant impact on the roll of Achaleven Primary School. There are currently 36 primary
aged children residing in the Achaleven Primary School catchment. 20 of these children
currently attend Lochnell Primary School and 16 currently attend Dunbeg Primary School.

Page 65

65    
Table 2 shows the historic and current pupil numbers for both Achaleven, Dunbeg and
Lochnell Primary schools:      
Table 2:   Achaleven PS  Dunbeg PS   Lochnell PS 
Capacity  41  174  147 
Roll  Roll  Roll 
2008-09  39  80  92 
2009-2010  27  81  87 
2010-2011  8  79  92 
2011-2012  0  76  96 
2012-2013  4  73  101 
2013-2014  5  76  112 
2014-2015  9  81  109 
2015-2016  10  82  114 
2016-2017  12  78  124 
2017-2018  9  99  130 
2018-19  13  88  124 
2019-20  9  98  114 
2020-21  7  90  112 
2021-22  0  88  119 
2022-23  0  89  118 
Table 3 shows projected rolls for Achaleven, Dunbeg and Lochnell Primary Schools
according to figures held by Argyll and Bute Council: 
Table 3:   Achaleven PS  Dunbeg PS   Lochnell PS  
Capacity  41  174   147  
2023 -2024  1   125   116 
2024 -2025  0   128   114 
2025-2026  0   130   122 
* A prediction based on information available date 
4.   COMMUNITY ENGAGEMENT 
4.1   Meetings 
A Community Engagement Meeting was held in Achaleven Primary School, on December
1st, 2022 from 13:00-19:00 hours.  This was to seek the views of the community on the future

Page 66

66  
of Achaleven School. This meeting was attended by 5 people from 3 households. There are
currently no primary aged children in Lochnell Primary who previously attended Achaleven
Primary School, and there are currently 2 primary aged children in Dunbeg Primary who
previously attended Achaleven Primary School.          
4.2   Content of Meetings 
Attendees at the meetings were given an overview of the information that the Council would
be using in this Options Appraisal, this included pupil projections, financial information,
development information and local services and facilities.      
The questions were as follows: 
Over the last year and a half, what has been the effect of mothballing Achaleven School on
you, your family and community? 
In your view what are the pros/cons of the following options: 
• Continue with mothballing 
• Re- open the school 
• Close the school 
Attendees also noted questions regarding the future of the school, and points of information
that should be considered in the Options Appraisal. 
4.3   Feedback 
There was a range of viewpoints on the future of Achaleven School: 
• Community and Parents 
The majority of the community were in agreement that the low numbers of children
did not make the re-opening of the school realistic.  There was a small percentage
of people in support of continued mothballing in order to retain the building in case
of future need. The majority of the community felt that it would be disappointing if
the building lay empty and became derelict and were keen to explore other options
for the building should the school close permanently. Parents of children with very
young children expressed concern that the school may be closed but agreed this
may be the best option when projected numbers were clarified.    
• Staff 
Staff members acknowledged that without a significant number of pupils, reopening
the school is not viable.        
General Comments: 
‘I don’t think I would send my children to Achaleven if there were only a few other children in
the school.’

Page 67

67    
‘I already send my children to Lochnell as there is also Pre 5 provision there and transport
is easy’    
‘Continued mothballing would mean further deterioration to the building and it may end up
beyond repair which would be a shame’ 
‘Mothballing could be beneficial if there are a viable number of children due to start at
Achaleven in the next few years but it wouldn’t be good for the children if there were going
to be very low numbers in classes and across the school’    
‘Is there enough capacity at other local schools to accommodate pupils from Achaleven in
the future?’ 
‘It would be beneficial to have a safe cycle route to Dunbeg’ 
‘If projected numbers are very low or non-existent then it makes more sense to close’ 
Pupil comments 
‘I was worried and optimistic. The old school was small. We are a lot happier at Dunbeg
than we were at Achaleven.’ 
‘I was worried about moving from a small to a really big school. I was not used to it. I was
pretty ok afterwards. If I had to go back to a small school I'd feel pretty confused and I'd not
be used to it.’ 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE PROPOSAL AS
CONSIDERED BY THE COMMUNITY ENGAGEMENT 
Achaleven Primary School has been mothballed since August 2021. The school roll was very
low and there were no pupils projected to attend in August 2021 or August 2022. The roll is
not predicted to rise above 1 pupil in the near future. There is very little community support
for the reopening of the school.    
Whilst the building is mothballed it continues to deteriorate. The community is keen to ensure
a future for the building if possible. Along with several other rural councils, Argyll and Bute is
facing increasing challenges in recruiting staff. In January 2023 there were 15.9 fte vacancies
for both Head Teachers and Teachers.    
The Council is required to consider the future of Achaleven Primary School. The following
options are explored within this paper: 
a) Re-open Achaleven Primary School. 
b) Continued Mothballing of Achaleven Primary with the pupils zoned to either Lochnell or
Dunbeg Primary Schools. 
c) Close Achaleven Primary School and realign its catchment area to Dunbeg Primary 
School

Page 68

68  
d) Close Achaleven Primary School and realign its catchment area to Lochnell Primary
School. 
6. OPTION A: RE-OPEN ACHALEVEN PRIMARY SCHOOL 
6.1   Community Feedback 
Of the 5 community members that attended the Options Appraisal engagement event, no one
was in support of re-opening the School because the lack of feasibility due to low pupil
numbers. 
Pupil comment 
‘Over all closing it was a healthy decision. It was really small and you couldn't really make
friends.’ 
6.2  Pupil Numbers 
If the school were to reopen in August 2023, the maximum Primary 1 intake in terms of
catchment pupils would be one. It has been stated that without a viable number of pupils for
the School, parents would not be considering placing their children to attend Achaleven
Primary School if it were to re-open. In the six years from 2014-2020 (before the school was
mothballed in August 2021), an average of 5 placing requests were made to schools out-with
the catchment each year. Currently, there are 36 primary school aged children residing within
the catchment area for Achaleven Primary School. 20 of these pupils attend Lochnell Primary
School and 16 attend Dunbeg Primary School.    
If the school were to re-open, sustainability may not be viable due to the fact that pupil
numbers over the next four years are not predicted to rise and are well below the capacity of
the school building. 
Table 4: Pupil Numbers 
Achaleven 
Primary 
2023/24  2024/25  2025/26  2026/27 
Approved 
Capacity 
41  41  41  41 
Roll 
Projection 
1  0  0  0 
6.3  Financial Information 
The total amount including employee; premises; supplies and services and catering
consideration to re-open the school is £140, 6603 
The annual cost of mothballing Achaleven Primary School is £5,400. 
3 Annual costs for running a comparative school for Achaleven Primary School.

Page 69

69    
The cost to bring the property to an acceptable standard to re-open the school is £25,465.   
6.4   Assessment of Rural Factors  
The reasons why the future of Achaleven Primary School is being considered are as stated
at Section 2 of this report. There is no expectation for the pupil numbers at Achaleven Primary 
School to increase. Achaleven Primary School is currently mothballed and there were no
pupils enrolled to start Primary 1 in either August 2021 or August 2022.  To reopen the school
would not increase the pupil numbers.   
6.4.1  Community Impact 
The reopening of the school would enable the premises to be used by the community.
It would also be a possibility that the school pupils would invite the community to
specific events, as they did in the past. The presence of a school and the
facilities/activities that may be offered could make the area a more attractive place to
live although it is recognised that two other primary schools are nearby. Reopening
the school may therefore encourage families with school age children to move to the
community. This in turn may make the community more sustainable.    
However, the community have demonstrated no wish for the school to reopen. Almost
all who attended the community engagement event indicated that it would be
worthwhile to explore the repurposing of the school building to become a facility for the
community to use rather than an educational establishment.    
Respondents noted the negative impact of the school mothballing on the community
as: 
• The visual impact on the community of the mothballed school. 
• The continued deterioration of the building. 
If the school were to reopen as an educational establishment there would be an
economic impact with respect to the considerable expenditure needed to bring the
building up to standard.  There would also be costs relating to staffing, and ongoing
maintenance.  Maintenance and building costs would also have to be met by the
community if the school were to reopen as a community hub.  The reopening of the
school and the potential relocation of families may have a positive effect on the wider
economy of the community. 
6.4.2   Travel Arrangements 
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes by car/bus.
The travel distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the
A85 and A828. Travel time is approximately 8 minutes by car/bus.  The travel
arrangements have been in place for 18 months. Travel is an accepted aspect of living
in the Achaleven community. If Achaleven Primary School was to reopen there could
be a positive impact on the health and wellbeing and education of pupils who are able

Page 70

70  
to walk or cycle to school. Staff would either travel to the school by car, or if they live
locally could walk or cycle. There may be a positive environmental impact as the use
of vehicles to transport pupils may decrease. Conversely, there could be increased car
usage by staff which may mean these travel arrangements have a negative
environmental impact. The respective positive and negative impact may therefore
balance.   
6.5   Educational Benefits  
The principles of Curriculum for Excellence recognise the professionalism of teachers
and the importance of this in exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to design their curriculum to meet
the specific needs of their children and community. There are no specific educational
benefits from reopening the school as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children. 
With respect to outdoor learning, community spaces could be used either in the school
grounds or in the immediate neighbourhood if the school were to reopen.  Outdoor
learning is provided by all schools. 
There would be issues with respect to the current condition and suitability of the school
buildings and facilities which would negatively impact learning and teaching.   
6.6   Summary 
5 people attended the consultation and the majority were not in favour of reopening
Achaleven Primary as a school.  If the school reopened, projected P1 pupil numbers
for August 2023 would be one, and this is predicted to decrease over the next three
years.   There are currently 36 children residing in the Achaleven Primary School
catchment area, 20 of these pupils attend Lochnell Primary School and 16 attend
Dunbeg Primary School.  An average of 5 placing requests to schools out-with the
Achaleven catchment area have been made each academic session from 2014 until
the school was mothballed in 2021. This has had a significant impact on the school
roll and the Primary 1 intake.    
There are financial implications if the school is to be reopened.  The total amount
including employee; premises; supplies and services and catering consideration to
reopen the school is £140,6604, with the cost to bring the property to an acceptable
standard to re-open the school is £25, 465.   
If the School was to be reopened, the premises would be able to be used by the
community out-with school hours as a hub, in addition to its use as an educational
facility. However, Connel Village Hall is a short distance from the school and is
currently used for community events.  The reopening of the School may encourage
families with school age children to move to the community, which may make the
community more sustainable. 
4 Annual costs for running a comparative school for Achaleven.

Page 71

71  
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes by car/bus.
The travel distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the
A85 and A828. Travel time is approximately 8 minutes by car/bus.  The travel
arrangements have been in place for 18 months. Travel is an accepted aspect of living
in the Achaleven community. If Achaleven Primary School was to reopen there could
be a positive impact on the health and wellbeing and education of pupils who are able
to walk or cycle to school. Staff would either travel to the school by car, or if they live
locally could walk or cycle. There may be a positive environmental impact as the use 
of vehicles to transport pupils may decrease. Conversely, there could be increased car
usage by staff which may mean these travel arrangements have a negative
environmental impact. The respective positive and negative impact may therefore
balance.      
There are no specific educational benefits from reopening the school as all schools
implement Curriculum for Excellence ensuring effective learning and teaching which
is matched to the needs of children. 
When considering the above alongside projected low pupil numbers, the challenges in
recruiting teaching staff, the considerable expenditure needed to bring the building up
to standard and the lack of local support for reopening Achaleven Primary School this
is not considered to be a reasonable option. 
7.  OPTION B: CONTINUED MOTHBALLING OF ACHALEVEN PRIMARY SCHOOL WITH
PUPILS ZONED TO LOCHNELL AND DUNBEG PRIMARY SCHOOLS 
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school and
the desirability of maintaining capacity to re-open a school there, but it is unlikely that
it should exceed 3 years in areas that are not very remote.” Achaleven Primary School
has been mothballed since August 2021. 
7.1   Community Feedback 
There are some ideas for the future of the building which may be taken forward by the
community as a hub for community life, although it was noted that Connel Village Hall
is only 330 yards from the school. There was a significant view at the community
meeting that mothballing the school over a long period is wasteful due to deterioration
of the property and should not be prolonged: 
‘We are concerned that the building falls into disrepair and becomes derelict or an
eyesore’ 
‘It would be good to discuss potential future use of the building at a Community
Council Meeting’ 
‘It would be good if the building could house a nursery provision but understand that
low numbers may mean that this is not viable’

Page 72

72   
7.2  Pupil Numbers 
Pupil numbers are not projected to increase over the next 4 years, as per Table 4
above.     
7.3   Financial Information 
The current annual cost 2022/23 to the Council of the mothballed Achaleven Primary
School is £5,400. This includes electricity, heating oil, and ground maintenance but
does not include building maintenance and repair costs. Neither does it take account
of the cost to bring the property to an acceptable standard to re-open the school which
is £25,465.  Pupils living in the Achaleven Primary School catchment area are currently
transported to Lochnell Primary and Dunbeg Primary through parental choice. A
Council minibus transports the pupils to Dunbeg Primary at a cost of approximately
£19,009 per annum and a West Coast Motors service bus transports the pupils to
Lochnell Primary. Due to the fact that the West Coast Motors service operates on an
existing route and is part of a larger contract, there is no additional cost to transport
pupils from Achaleven to Lochnell Primary School.     
7.4   Assessment of Rural Factors  
The reasons why the future of Achaleven Primary School is being considered are as
stated at Section 2 of this Report. There is no expectation that the pupil numbers at
Achaleven Primary School will increase. Achaleven Primary School is currently
mothballed and although there are currently no registered pupils, pupils would be
rezoned to another local school. To reopen the school would not increase the pupil
numbers.    
7.4.1  Community Impact 
If pupils are to continue their education in Lochnell and Dunbeg Primary
Schools there would be no change to the current impact on the community.  If
the mothballing of Achaleven was to continue the building would deteriorate
further and eventually become unavailable. This could have a detrimental effect
on the sustainability of the Achaleven community. At present the school
grounds are available for community use. The small number of community
residents who attended the meeting view the buildings and grounds as a
potential opportunity to develop a community hub and there were some
suggestions for possible usage. This may make the area a more attractive place
to live, and in turn, may positively impact community sustainability. 
7.4.2  Travel Arrangements 
There is no change to the travel arrangements that are currently in place nor to
the environmental impact from these.  The travel distance (sourced from
Google maps) from Achaleven Primary to Dunbeg Primary is 2.8 miles via the
A85. Travel time is approximately 6 minutes. The travel distance from
Achaleven Primary to Lochnell Primary is 3.6 miles via the A85 and A828 and
travel time is approximately 8 minutes. The travel arrangements have been in
place for 18 months. Travel is an accepted aspect of living in the Achaleven
community. Continued mothballing of Achaleven Primary School would have
no effect on current staff travel. The small number of children has minimal effect
on staffing within the receiving primary schools. Pupils living in the Achaleven

Page 73

73  
Primary School catchment area are currently transported to Lochnell Primary
and Dunbeg Primary through parental choice. Currently, a Council minibus
transports the pupils to Dunbeg Primary and a West Coast Motors service bus
transports the pupils to Lochnell Primary. 
7.5   Educational Benefits  
The principles of Curriculum for Excellence recognise the professionalism of teachers
and the importance of this in exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to design their curriculum to meet
the specific needs of their children and community. There are no specific educational
benefits from reopening the school as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children. 
Achaleven, Dunbeg and Lochnell are remote rural schools. Each school is set within
a very remote rural area (Scottish Government classification).  Children from
Achaleven area, attending Lochnell and Dunbeg Primary Schools are benefitting from
the broader rural environment, whilst not moving their learning to a school that is
completely different to their home environment. High quality outdoor learning is
currently provided at both primary schools. 
The co-location of the nursery and the primary classes at Dunbeg and Lochnell
Primaries enhances the transition process for the children moving from Nursery into
Primary one, through joint educational processes and liaison between the settings.
Transition to secondary school is enhanced through joint planning and educational
experiences. 
7.6   Summary 
The majority of people who attended the consultation were not in favour of continuing
the mothballing of Achaleven Primary School if projected pupil numbers were not
expected to rise. There was a view at the community meetings that mothballing the
school over a long period was wasteful due to deterioration of the property and
potentially affected sustainability of the community. Pupil numbers are not predicted
to rise in terms of pre-school children living within the catchment area. Mothballing had
no positive impact on the reasons for the proposal. 
The current annual cost (2022/23) to the Council of the mothballed Achaleven Primary
School is £5,400. This includes electricity, heating oil, and ground maintenance but
does not include building maintenance and repair costs. Neither does it take account
of the cost to bring the property to an acceptable standard to re-open the school which
is £25,465.  There is no current annual transport cost for taking pupils to an alternative
school. 
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85. Travel time is approximately 6 minutes. The travel
distance from Achaleven Primary to Lochnell Primary is 3.6 miles via the A85 and
A828 and travel time is approximately 8 minutes. The travel arrangements have been
in place for 18 months. Adverse weather can be a factor, however this is the same for
other local schools and areas. Pupils living in the Achaleven Primary School catchment

Page 74

74  
area are currently transported to Lochnell Primary and Dunbeg Primary through
parental choice. A Council minibus transports the pupils to Dunbeg Primary and a
West Coast Motors service bus transports the pupils to Lochnell Primary. The travel
arrangements have been in place for 18 months.  Should the school continue to be
mothballed these travel arrangements would continue. 
There are no specific educational benefits from continuing the mothballing of
Achaleven Primary school.    
On the basis that pupil numbers are not expected to increase significantly and the
building’s mothballing is not of benefit to the community or the Council, continued
mothballing of Achaleven Primary School is not viewed as a reasonable option. 
8.  OPTION C: CLOSE ACHALEVEN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR DUNBEG PRIMARY SCHOOL TO INCLUDE THE
CURRENT ACHALEVEN CATCHMENT AREA 
8.1   Community Feedback 
The majority of people who attended the Options Appraisal meeting were not in favour
of reopening Achaleven Primary as a school given the very low/ no projected pupil
numbers. They commented that there were not enough children to support re-opening
the School. Additionally, with respect to very low/ non-existent numbers in future
school roll projections, the sustainability of the School did not support re-opening of
the School. Comments in relation to the closure of Achaleven Primary School and
attendance at Dunbeg Primary School were generally positive: 
‘It would be beneficial if there was a safe walk or cycling route to Dunbeg’    
‘I would prefer that my child was able to walk or cycle to school but appreciate that in
a more rural setting, this isn’t always possible’ 
Pupil comments 
‘I wouldn't mind it (Achaleven) staying open but I would be upset to have to go back.
I'd like to stay here. I like a big school.’ 
8.2   Pupil Numbers 
Table 5: Schools Occupancy: 
Primary  2023/2024  2024/25 
Dunbeg 
Approved 
Capacity 
174  174 
Dunbeg 
Projected 
Roll  
125  128

Page 75

75  
Achaleven 
Projected 
Roll 
1  0 
Total  Roll 
Projection 
126  128 
Occupancy  72.4%  73.5% 
Pupils from Achaleven Primary catchment area would attend Dunbeg Primary School,
as there are currently no pupils attending Achaleven there is no significant projected
addition to school roll at Dunbeg Primary School. The current occupancy rate for
Dunbeg Primary School is 51%.   There is a projected roll of one pupil for Achaleven
Primary for August 2023. This coupled with an increase in projected pupil numbers
within the catchment area will take the roll for Dunbeg Primary from 89 in session
2022/23 to 126 in session 2023/24. The significant increase forecast is due to new
house building taking place in the area. The projected school roll for Dunbeg Primary
School is expected to increase incrementally over the next 9 years. By 2030, Dunbeg
Primary School is expected to have an occupancy rate of 90%.     
8.3   Financial Information 
If the existing council minibus was to be used, this would cost approximately £19,009
per annum. If Achaleven Primary School were to be closed it would generate savings
of £5,400 - the current annual cost of mothballing (2022/23) to the Council. This
includes electricity, heating oil, and ground maintenance but does not include building
maintenance and repair costs.       
8.4   Assessment of Rural Factors  
The reasons why the future of Achaleven Primary School is being reviewed are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Achaleven Primary School to increase. Achaleven Primary School is currently
mothballed and were there pupils they would be rezoned to other schools. To reopen
the school would not increase the pupil numbers.   
8.4.1  Community Impact 
The community supported the proposed closure of the school with the building
and adjoining grounds being retained for community use where viable. All
people who attended the consultation stated that they would be in favour of
preliminary work to investigate whether the school building could be retained
for community use and not allowed to fall into further disrepair, as that would
adversely impact on the visual impact of the village. While it is accepted that
school closure may have an adverse effect on a community, a community hub
could be an asset to a community. However, as previously stated, Connel
Village Hall is situated 330 yards from Achaleven Primary School and is used
for village events.  If the Community wished to create a community hub, they
would require to find a mechanism to acquire the property from the Council and
deliver that aspiration. The buildings forming the school premises are situated
within walking distance of the village. If the local plans for the building progress,

Page 76

76  
this may have a positive impact on the sustainability of the village. Formal
closure of the school would mean that these plans could potentially be
progressed by the community. 
8.4.2  Travel Arrangements 
The travel distance (sourced from Google maps) from Achaleven Primary to 
Dunbeg Primary is 2.8 miles via the A85. Travel time is approximately 6 
minutes. The travel arrangements have been in place for 18 months. Travel is
an accepted aspect of living in the Achaleven community. This option would
have no effect on the current travel arrangements of staff and pupils. The
closure of Achaleven Primary School, in terms of travel would have a neutral
effect on the environment.  There is currently an annual transport cost of
approximately £19,009 per annum for pupils to travel to Dunbeg Primary
School on a council mini bus. Going forward, this cost would continue to be
incurred annually.     
8.5   Educational Benefits  
The principles of Curriculum for Excellence recognise the professionalism of teachers
and the importance of this in exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to design their curriculum to meet
the specific needs of their children and community. There are no specific educational
benefits as all schools implement Curriculum for Excellence ensuring effective learning
and teaching which is matched to the needs of children. 
Both Dunbeg and Achaleven are very remote rural schools. Each school is set within
a remote rural area (Scottish Government classification).  Children from Achaleven
area who would attend Dunbeg Primary School are benefitting from the broader rural
environment, whilst not moving their learning to a school that is completely different to
their home environment. High quality outdoor learning is currently provided at Dunbeg
Primary. The pupils would then be transitioning to Oban High School with an
established friendship group. 
In Dunbeg Primary School children are taught in classes composed of children from
more than one year group. Children benefit from being part of a social context in which
they can build relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as members of a social group. They are
able to interact and socialise with groups of children of their own gender, take part in
team activities and move with their peers to secondary school. 
8.6   Summary 
The majority of people who attended the Community Engagement event were in favour
of closing Achaleven Primary as a school. They also commented on the potential for
the school premises to be used as a community asset. 
The current capacity for Dunbeg Primary School is 51%, however, due to house
building within the catchment, there is expected to be a significant increase in the
school roll and therefore a significant increase in the occupancy rate of the school.
This is projected to be 72.4% by August 2023 and 90% by August 2030. The additional

Page 77

77  
annual cost to transport pupils to Dunbeg Primary school on a council mini bus is
approximately £19,009 per annum. Going forward, this cost would continue to be
incurred annually.    
The travel distance (sourced from Google maps) from Achaleven Primary to Dunbeg
Primary is 2.8 miles via the A85 and this option would have no effect on the current
travel arrangements of staff and pupils. The closure of Achaleven Primary School
would therefore have a neutral effect on the environment. Dunbeg Primary currently
accommodates pupils from Achaleven School and pupil numbers travelling from the
current Achaleven catchment area are not projected to increase significantly.
However, Dunbeg Primary has limited capacity to continue to accommodate the
projected pupil numbers due to the projected increase in the roll through an increase
in pupils residing within the catchment area.    
On the basis, as detailed previously, that the school roll at Dunbeg Primary is projected
to increase significantly and therefore the school capacity rate will also increase
annually for the foreseeable future, the closure of Achaleven Primary School and
realignment of the Dunbeg Primary School catchment area to include the current
Achaleven Primary School catchment is not viewed as a reasonable option. 
9.  OPTION D: CLOSE ACHALEVEN PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR LOCHNELL PRIMARY SCHOOL TO INCLUDE THE
CURRENT ACHALEVEN PRIMARY SCHOOL CATCHMENT AREA 
9.1   Community Feedback 
The majority of people who attended the Options Appraisal meeting were not in favour
of reopening Achaleven Primary as a school given the very low/no projected pupil
numbers. They commented that there were not enough children to support re-opening
the School. Additionally, with respect to very low/ non-existent numbers in future
school roll projections, the sustainability of the School did not support re-opening of
the School. Comments in relation to the closure of Achaleven Primary School and
attendance at Lochnell Primary School were generally positive: 
‘I already send my children to Lochnell Primary School and transport is easy’ 
‘I would prefer that my child was able to walk or cycle to school but appreciate that in
a more rural setting, this isn’t always possible’ 
Community members commented on the school premises and potential for this to
become a community asset: 
‘The building to be used for a purpose to benefit the community for example a
community hub with a nursery and café.’ 
Community members discussed potentially pursuing options for use of the building as
a community hub.

Page 78

78   
9.2   Pupil Numbers 
Table 5: Schools Occupancy: 
Primary  2023/2024  2024/25 
Lochnell 
Approved 
Capacity 
147  147 
Primary  2023/2024  2024/25 
Lochnell 
Projected 
Roll  
116  114 
Achaleven 
Projected 
Roll 
1  0 
Total  Roll 
Projection 
117  114 
Occupancy  79.6%  77.6% 
Pupils from Achaleven Primary catchment area would attend Lochnell Primary School.
As there are currently no pupils attending Achaleven there is no projected addition to
school roll at Lochnell Primary School. The current occupancy rate for Lochnell
Primary School is 80%.   There is a projected roll of one pupil for Achaleven Primary
for August 2023, this would take the projected roll for Lochnell Primary to 117.     
9.3   Financial Information 
An existing West Coast bus means that there would be no additional annual transport
costs. If Achaleven Primary School were to be closed it would generate savings of
£5,400 - the current annual cost of mothballing (2022/23) to the Council. This includes
electricity, heating oil, and ground maintenance but does not include building
maintenance and repair costs.       
9.4   Assessment of Rural Factors  
The reasons why the future of Achaleven Primary School is being reviewed are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Achaleven Primary School to increase. Achaleven Primary School is currently
mothballed and were there pupils they would be rezoned to other schools. To reopen
the school would not increase the pupil numbers.   
9.4.1  Community Impact 
The community supported the proposed closure of the school with the building
and adjoining grounds being retained for community use where viable. All
people who attended the consultation stated that they would be in favour of
preliminary work to investigate whether the school building could be retained
for community use and not allowed to fall into further disrepair, as that would
adversely impact on the visual impact of the village. While it is accepted that
school closure may have an adverse effect on a community, a community hub

Page 79

79  
could be an asset to a community. However, as previously stated, Connel
Village Hall is situated 330 yards from Achaleven Primary School and is used
for village events.  If the Community wished to create a community hub, they
would require to find a mechanism to acquire the property from the Council and
deliver that aspiration. The buildings forming the school premises are situated
within walking distance of the village. If the local plans for the building progress,
this may have a positive impact on the sustainability of the village. Formal
closure of the school would mean that these plans could potentially be
progressed by the community. 
9.4.2  Travel Arrangements 
The travel distance (sourced from Google maps) from Achaleven Primary to
Lochnell Primary is 3.6 miles via the A85 and the A828. Travel time is
approximately 8 minutes. The travel arrangements have been in place for 18
months. Travel is an accepted aspect of living in the Achaleven community.
This option would have no effect on the current travel arrangements of staff
and pupils. The closure of Achaleven Primary School, in terms of travel would
have a neutral effect on the environment.  There is currently no annual
transport cost for pupils to travel to Lochnell Primary School as it is part of an
existing West Coast Motors service bus and therefore would not incur
additional costs in the immediate future. 
9.5   Educational Benefits  
The principles of Curriculum for Excellence recognise the professionalism of teachers
and the importance of this in exercising the freedom and responsibility associated with
broader guidance. This means that schools are able to design their curriculum to meet
the specific needs of their children and community. There are no specific educational
benefits as all schools implement Curriculum for Excellence ensuring effective learning
and teaching which is matched to the needs of children. 
Both Lochnell and Achaleven are very remote rural schools. Each school is set within
a remote rural area (Scottish Government classification).  Children from Achaleven
area who would attend Lochnell Primary School are benefitting from the broader rural
environment, whilst not moving their learning to a school that is completely different to
their home environment. High quality outdoor learning is currently provided at Lochnell
Primary. The pupils would then be transitioning to Oban High School with an
established friendship group. 
In Lochnell Primary School children are taught in classes composed of children from
more than one year group. Children benefit from being part of a social context in which
they can build relationships with different groups and individuals, develop social skills,
meet challenges and exercise responsibilities as members of a social group. They are
able to interact and socialise with groups of children of their own gender, take part in
team activities and move with their peers to secondary school.

Page 80

80   
9.6   Summary 
The majority of people who attended the Community Engagement event were in favour
of closing Achaleven Primary as a school. They also commented on the potential for
the school premises to be used as a community asset. 
Current capacity for Lochnell Primary School is 80%, with no significant increase to
the school roll predicted in forthcoming years. There is no additional annual cost to
transport pupils to Lochnell Primary school as this is part of an existing route and wider
contract with West Coast Motors and use of the existing West Coast Motors service
bus would not incur additional costs.    
The travel distance (sourced from Google maps) from Achaleven Primary to Lochnell
Primary is 3.6 miles via the A85 and the A828 and this option would have no effect on
the current travel arrangements of staff and pupils. The closure of Achaleven Primary
School would therefore have a neutral effect on the environment. Lochnell Primary
currently accommodates pupils from Achaleven Primary School’s catchment area, and
pupil numbers are not projected to increase significantly. Lochnell Primary has
capacity to continue to accommodate the projected pupil numbers.    
In Lochnell Primary School, children benefit from a very positive learning environment
with learning and teaching which is well matched to the needs of the young people
who attend the school. In addition there is a clear focus on nurturing the health and
wellbeing of pupils.    
This has been identified as a reasonable option for further consideration.       
9.   OVERVIEW OF OPTIONS 
Option  Option Description  Outcome 
A  Re-open Achaleven Primary School with
the existing catchment area 
Not a reasonable option. 
B  Continued Mothballing of Achaleven
Primary School with the pupils zoned to 
Dunbeg and Lochnell  Primary Schools 
Not a reasonable option. 
C  Close Achaleven Primary School and
realign the catchment area of Dunbeg
Primary School to include the current
catchment area for Achaleven Primary
School. 
Not a reasonable option. 
D  Close Achaleven Primary School and
realign the catchment area of Lochnell
Primary School to include the current
catchment area for Achaleven Primary
School. 
A reasonable option with
some representation that
the school becomes a
facility the community can
develop if viable.

Page 81

81    
10.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE ACHALEVEN PRIMARY
SCHOOL AND REALIGN THE CATCHMENT AREA FOR LOCHNELL PRIMARY
SCHOOL TO INCLUDE THE CURRENT ACHALEVEN CATCHMENT AREA 
10.1 Pupil Projections 
Primary  2023/2024  2024/25 
Lochnell 
Approved 
Capacity 
147  147 
Lochnell 
Projected 
Roll  
116  114 
Achaleven 
Projected 
Roll 
1  0 
Total  Roll 
Projection 
117  114 
Occupancy  79.6%  77.6% 
10.2  Educational Benefits 
This statement focusses on Lochnell Primary School which is one of the schools that
parents/carers within the Achaleven Catchment can currently choose to send their
child to, and the school which would subsume Achaleven’s current catchment area as
part of Option D. 
10.2.1   Learning and Teaching 
The curriculum includes a broad range of experiences which are planned
for children and young people through their education, to help every child
and young person to develop knowledge, skills and attributes for
success in learning, life and work. 
The school are committed to providing appropriate opportunities for the
development of pupils’ spiritual, moral, social and cultural values through
both the ethos and the curriculum.  This is undertaken in partnership with
parents/carers and takes account of the individual needs of pupils and
the views of parents/carers. 
The aim of Lochnell Primary School and Early Years is to ensure each
child feels safe and happy so that they may achieve their potential. To
do this, the school follow the principles of being Ready, Respectful and
Safe (RRS).  These principles sit alongside their core values which were
reviewed and refreshed in January 2020.  The core school values are:
Kind, ambitious, fun, inclusive and curious.

Page 82

82    
The aims of Lochnell Primary are to:  o Inspire curiosity and
creativity through rich learning experiences. 
o Encourage ambition by opening minds, aiming high and
celebrating achievements. 
o Develop kindness through an ethos of inclusion and mutual
respect. 
o Enable appreciation and consideration of our local
community and the wider world. 
o Create a calm, purposeful and fun learning environment
where learners feel valued. 
o Continue to evaluate, evolve and excel! 
Children know that their views are sought, valued and acted upon. The
learning environment encourages high level of achievement, providing a
wide range of opportunities for children to achieve their full potential
within the four contexts of learning. 
In Lochnell Primary School children may be taught in classes composed
of children from more than one year group. Children benefit from being
part of a social context in which they can build relationships with different
groups and individuals, develop social skills, meet challenges and
exercise responsibilities as members of a social group. They are able to
interact and socialise with groups of children of varying sizes and
composition, take part in team activities and move with their peers to
secondary school. 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and outcomes
of curriculum for excellence. The National Improvement Framework
priorities include raising attainment for all, and closing the gap between
the most and least disadvantaged children.      
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising the
freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. The general aim of the
school is to provide an atmosphere of mutual respect and collective
responsibility.  Pupils, parents/carers and staff all have an important part
to play in producing and sustaining this positive ethos.   
Lochnell Primary School welcomes and encourages diversity and
individuality, while emphasizing their common commitment to moral
values such as honesty, respect for others, compassion and justice. 
Fundamental principles of the school are that all who are involved in the
life of the school have the right to be respected as individuals and carry
the responsibility to act in a considerate and respectful manner towards

Page 83

83  
others.  The school are firmly committed to the elimination of any form
of discrimination on the grounds of race, religion, gender or disability. 
Lochnell has a working partnership with the village church and enjoy
visits to church (virtual or in person) to celebrate special events
throughout the year.  The pupils also enjoy visits to the school and early
years setting by the local minister.  They welcome connections to other
faiths and have linked with members of different faiths to provide a
context for their curriculum and enhance understanding. Lochnell
School, its resources and activities provide a focal point for the
community.  The involvement of parents/carers and other members of
the community in school activities is highly valued and increases the
range of experiences on offer for learners. 
Parents are kept informed of school activities and the school are
currently reviewing how best to do this.  Parents/carers are always
welcome to call at the school for further information and/or to arrange to
see the Head Teacher. 
Having an early years setting alongside the school has improved
transition and liaison.  However, the school are careful to maintain links
with the other pre-5 groups in the area to ensure a smooth transition
process into P1 for all. 
Links with other Oban and Lorn Primary schools are strong and when
possible, the pupils enjoy activities throughout the year to share their
learning and skills. Active Schools provide many opportunities for the
pupils and there is an ongoing programme to train Young Leaders,
ensuring additional leadership opportunities within the school. 
Lochnell School has very strong links with Oban High and this makes
the transition from P7 to S1 smooth and productive, ensuring that all
pupils are well support as they move to High School.    
Both Lochnell and Achaleven are very remote rural schools. Each school
is set within a remote rural area (Scottish Government classification). 
Children from Achaleven area, who would attend Lochnell Primary
School would benefit from the broader rural environment, whilst not
moving their learning to a school that is completely different to their home
environment. 
10.2.2   Outcomes 
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to
ensure each child has the opportunity to reach their potential.  Careful
tracking and monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with teachers, learning

Page 84

84  
discussions with children, classroom observations, assessment and
looking at pupil work. Planning for Progress meetings are being further
strengthened. These discussions between home and school improve
parental engagement whilst focussing on next steps for learning. Where
appropriate, intervention is put in place, while working effectively with
other agencies and parents to ensure the needs of each child are met.    
In the primary classes, standards of attainment have been maintained
over the last three years. Most children are achieving national
expectations in reading, writing, listening, talking and numeracy.       
10.2.3   Experiences - Broadening the Range of Opportunities  
Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities and
attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future.  Throughout the school
session there are opportunities for the children to take part in wider –
curricular activities and after school clubs.   
The variety, frequency and nature of the clubs depends on the
availability of staff and senior pupils and parents to run and supervise
them.  More information is available from the school office. 
Educational visits are an important part of the learning process and it is
crucial to use our environment as a learning resource. The number and
scope of these visits is governed by our financial situation and the
opportunities available. Parents and carers help us supervise these
outings and we are grateful for the enthusiastic help. Groups from the
school compete in local festivals and competitions 
10.2.4   Environment for Learning 
Lochnell Primary School is situated in the village of Benderloch on the
main Oban to Fort William road. The building is single storey and was
opened in 1992. The teaching bays in the original building are semi
open plan. The new extension teaching bays are open plan. The entire
building is well maintained and along with the surrounding scenery
provides attractive accommodation for the primary school. 
A joint school and community project was completed to provide and
maintain and all weather pitch adjacent to the school. The pitch is used
very well by the school every day. The community have access to the
pitch out with school times and the public can book it at the local garage. 
The building has facilities for pupils and visitors with special access
needs. They enjoy good links with Oban High School as the associated
secondary school. Lochnell Primary has a Pre5 Unit within the school for
3 and 4 year olds.

Page 85

85  
10.3  Assessment of Rural Factors  
The reasons why the future of Achaleven Primary School is being reviewed are stated
at Section 2 of this report. There is currently no expectation for the pupil numbers to
increase at the School. Achaleven Primary School is mothballed with no current pupils.
Having considered all the alternatives above, the option to close Achaleven Primary
School and realign the catchment area for Lochnell Primary School to include the
former Achaleven Primary School catchment area is considered the most reasonable
means to address the reasons identified at Section 2 of this report. 
10.3.1   Community Impact 
The community overwhelmingly supported closure of the school with the
suggestion that the building and adjoining grounds could potentially be
retained for community use. Within Achaleven there is a Village Hall
which houses community events. All people who attended the Options
Appraisal Meeting stated that if possible they would prefer to see the
school building retained for community use and not allowed to fall in to
further disrepair, as that would adversely impact on the community’s
access to the premises and the visual impact of the village. It is accepted
that a school closure may have an adverse effect on a community.
Formal closure of the school would mean that future plans for the
building could potentially be progressed by the community. 
10.3.2   Travel Arrangements 
The travel distance (sourced from Google maps) from Achaleven
Primary to Lochnell Primary is 3.6 miles via the A85 and A828. Travel
time is approximately 8 minutes. The travel arrangements have been in
place for 18 months. Travel is an accepted aspect of living in the
Achaleven community. Pupils will travel on the existing West Coast
Motors service bus and eventually all the pupils will travel to Lochnell
Primary School. The environmental impact of travel will be minimal, as
these arrangements are currently in place due to the mothballing of
Achaleven Primary School. The closure of Achaleven Primary School, in
terms of travel, would have a neutral effect on the environment. There is
currently no additional annual transport cost of taking pupils to Lochnell
Primary School and the continued use of the existing West Coast Motors
service bus would mean there are no future cost implications. 
10.4  Financial Impact 
The main elements included within a school budget are Teacher employment
costs (ie basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel, etc.). 
Teacher staffing budgets are calculated on an annual basis and within the
Primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school.  When a school ceases to be operational

Page 86

86  
the Teacher staffing budget is adjusted (at the appropriate time), per entitlement
information from Education HR, with the staffing budget resulting in a nil value. 
As a result of the authority’s policy for no Teacher redundancies it is presumed
that the staff are deployed elsewhere within the authority and therefore their
salary costs still exist with an increase to the receiving school’s budget.  This is
also in line with the national priority of maintaining teacher numbers.  This
methodology also applies to the school’s discretionary budget which again is
formula based.  The budget of the receiving school, in terms of any pupils being
transferred, will have increased.  The figures outlined below take account of the
fact that the staffing and discretionary budgets have been adjusted to nil. 
The annual running costs during mothballing of Achaleven Primary School are
a total of £5,400. 
Annual savings generated through closing Achaleven Primary School would be 
£5,400.   
The costs/savings outlined above assumes all revenue expenditure would
cease. This includes non-domestic rates, utility costs, insurances, etc.  If the
school was to be formally closed, this would allow the Council to take steps
towards selling the school to a third party or the local community. 
10.5  Environmental Impact 
Currently some pupils travel to Lochnell Primary. However this option would
have a neutral environmental impact on the current position and would have no
impact on the current travel arrangements for staff and pupils. Eventually all
pupils will attend Lochnell Primary School, a relatively short journey. Travel is
an accepted aspect of rural life. 
11.   CONCLUSION 
Four alternative options have been reviewed in considering the future of
Achaleven Primary School.  For each option, information was collated and
consideration was given to: 
• Community feedback; 
• Pupil numbers;  
• Financial Information; 
• Assessment of rural factors, including community impact, economic impact
and travel arrangements, and 
• Educational Benefits. 
An authority that is contemplating a rural school closure proposal must satisfy
the preliminary requirements set out in Section 12A of the 2010 Act before
formulating a proposal.    
After consideration of the preliminary requirements, as set out in the Act, and
the options, and having regard to the specific reasons identified at Section 2 of
this report, closing Achaleven Primary School and realigning the catchment
area of Lochnell Primary School to include the current catchment area for

Page 87

87  
Achaleven Primary School is the most reasonable option in order to address
the underlying reasons for the possible proposal. 
Members are asked to: 
• Note the outcome of this consideration of the preliminary requirements; and  
• Agree that Officers now formulate a draft closure proposal that will come
back to a future meeting of the Committee in August 2023 for approval by
Members which would subsequently trigger the formal consultation process
under the Schools (Consultation) (Scotland) Act 2010. 
Appendix 1

Page 88

88  
Appendix 2 
Appendix 3: Floorplan Achaleven Primary School

Page 89

89      
Appendix 4: Floorplan Lochnell Primary School

Page 90

Appendix 5: Floorplan Dunbeg Primary School and ELC

Page 91

APPENDIX 2 
Argyll and Bute Council: Equality and Socio-Economic Impact Assessment
Section 1: About the proposal 
Title of Proposal
To close Achaleven Primary School 
Intended outcome of proposal
The proposal is to close Achaleven Primary School. The views of all stakeholders
affected by this proposal were sought through the consultation phase.
The EqSEIA was reviewed and updated as required following the consultation
period. A consultation report prepared on the issue by Local Authority Officers, with
input from Education Scotland. This report will be presented to the Community
Services Committee (CSC) for their decision. 
The proposed outcome is the closure of the school, which has been mothballed
since June 2021. If after consultation the stakeholders involved in the process,
Education Scotland, and the CSC feel that the closure is not a reasonable option,
then the closure would not take place. 
Description of proposal

Page 92

Consideration of this proposal means that a decision is being taken about
permanently closing Achaleven Primary School. As per the legislative guidance set
out in the Schools (Consultation)(Scotland) Act 2010, Argyll and Bute Council has
sought views on the following proposal, namely:
It is proposed that education provision at Achaleven Primary School be discontinued
with effect from 31st May 2024.
Current catchment pupils of Achaleven Primary School will continue to be educated
at Lochnell and Dunbeg Primary School.
The catchment area of Lochnell Primary School shall be extended to include the
current catchment area of Achaleven Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are;
• Achaleven Primary School has been mothballed for over 2 years. The
school roll is very low and not predicted to rise significantly in the near
future. All Achaleven catchment pupils attend schools out with the
catchment area in accordance with placement requests submitted by
parents.
• Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing the EQSEIA there are
10.84fte vacancies for both teachers and Head teachers in Argyll and Bute.
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance. The annual cost of the mothballing of the building
is £15,866.   
On 24th August 2022, the Community Services Committee agreed that the Education
Service would undertake the required preliminary consultation and an Options
Appraisal for Achaleven Primary School.  On 24th August 2023, the Community
Services Committee agreed to adopt the draft closure proposal and a statutory
consultation took place from the 31st August 2023 to the 27th October 2023 with a
public meeting taking place in Achaleven Primary School on 4th October 2023.  In
person focus groups were also held with children at Lochnell and Dunbeg Primary
School on 29/09/23 and 02/10/23 respectively to ensure that their views were taken
into account. 
Business Outcome(s) / Corporate Outcome(s) to which the proposal
contributes
Argyll & Bute’s Annual Business Plan 2023-24: 
Attaining and achieving at all stages; we will improve outcomes for our children and
young people.

Page 93

Lead officer details: 
Name of lead officer Rachel Binnie
Job title Acting Education Manager
Department Customer Services Education
Appropriate officer details: 
Name of appropriate officer Wendy Brownlie
Job title Head of Education
Department Customer Services Education
Sign off of EqSEIA 
Date of sign off 29/01/2024 
Who will deliver the proposal?
During the mothballing period children could attend Lochnell or Dunbeg Primary
School. Should the closure go ahead pupils currently in these schools will remain in
these schools but the catchment area of Lochnell Primary School shall be extended
to include the current catchment area of Achaleven Primary School. 
Should the closure proposal go ahead from this point the Head Teacher of Lochnelll
Primary School will be the senior officer of the Council who provides the leadership
of the educational experience for the children attending this school, who would have
otherwise attended Achaleven Primary School. The Education Central team of the
Council will be responsible for the support and challenge of the school as per
standard protocols. 
Transport colleagues will be responsible for any travel arrangements for children
who are entitled to this, and this has already been in place since the Achaleven
Primary School was mothballed.

Page 94

Section 2: Evidence used in the course of carrying out EqSEIA 
Consultation / engagement

Page 95

Under the Schools (Consultation) (Scotland) Act 2010, if a local authority proposes
to close a school it must undertake a statutory consultation with the ‘relevant
consultees’ affected by this proposal. In this instance; Achaleven Primary School is
the ‘affected school’. 
The formal consultation on the proposal within this document was undertaken under
the terms of the Schools (Consultation) (Scotland) Act 2010 (“the Act”). The
consultation period started on 31st August 2023 (with due written notice of the
proposal issued to the relevant consultees listed in Appendix 1) and ended on 27th
October 2023. Written representations had to be received by this date in order to be
taken into account.
A copy of the proposal document was provided to the following ‘relevant consultees’
in terms of the Act:
• The Parent Councils of the affected schools 
• The parents of the pupils at the affected schools 
• Parents of children expected to attend an affected school within 2 years of
the date of publication of this Proposal Document 
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools 
• The teaching and ancillary staff at the affected schools 
• The trade unions representatives of the above staff 
• Argyll and Bute Councillors – Ward 5: Oban North and Lorn 
• Connel Community Council 
• Ardchattan Community Council 3 
• Dunbeg Community Council 
• Community Planning Partnership 
• The Constituency MSP 
• List MSPs for the area 
• The Constituency MP 
• Chief Superintendent, Police Scotland 
• Chief Executive, NHS Highland 
• Chief Executive Strathclyde Partnership for Transport (SPT) 
• Area Commander, Fire Scotland 
• Education Scotland
The steps listed below were also been taken to ensure that the proposal was widely
available: 
o The proposal document was published on the Argyll and Bute Council
website;
o This document could be made available in alternative forms or translated by
contacting Argyll House, Dunoon, tel: 01369 708576 or
argyllhousereception@argyll-bute.gov.uk; 
o Information on the consultation and how to take part was also advertised in
the Oban Times
.

Page 96

The proposal paper was available at the following locations;
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochnell Primary School, Benderloch, Oban, Argyll, PA37 1QS 
• Dunbeg Primary School, Dunbeg, Argyll, PA37 1QF 
• Connel Village Hall, Lora Rd, Connel, Argyll PA37 1PA 
• Oban Library, 77 Albany Street, Oban PA34 5AL6.4 
There was a public meeting held on the 4th October 2023 at 6.00pm in Achaleven
Primary School.
The catchment area for Achaleven Primary School is classed as remote rural. The
definition for remote rural are settlements with a population of less than 3,000 with
a greater than 30 minute drive time to the nearest settlement with a population of
10,000 or more. 
Data

Page 97

The Scottish Government’s Rural School List (October 2021) classifies Achaleven
Primary School as ‘very remote rural’. This is defined as an area with a population
of less than 3,000 people, and with a drive time of over 60 minutes to a settlement
of 10,000 or more. 
Using available data from the Small Area Population Estimates (2011 data Zone)
Achaleven Primary School falls into the Benderloch Trail-01 area. It should be noted
that this area includes catchment areas for other local schools.
SIMD Quintile 4
Population 1,111
School/nursery aged children
0-4
5-11
12-18 
51
108
87
Mid-2021 Small Area Population Estimates for 2011 Data Zones | National Records
of Scotland (nrscotland.gov.uk) 
Table 2:  Achaleven
Capacity 41 
Roll
2008-2009 39
2009-2010 27
2010-2011 8
2011-2012 0
2012-2013 4
2013-2014 5
2014-2015 9
2015-2016 10
2016-2017 12
2017-2018 9
2018-2019 13
2019-2020 9
2020-2021 7
2021-22 0
2022-23 0
2023 -2024 0
The school roll has fallen considerably over several years with a short period of
mothballing in 2011/12.

Page 98

There have been no further enrolments or enquiries since mothballing over 2 years
ago. Data as of July 2023 showed 7 children in the Achaleven catchment area
eligible to enrol in Primary 1. All children enrolled in other local schools.
The role is not projected to rise significantly in the future.
The historical trend has been for parents to send their children to other local, larger
schools. 
Further information on the proposed closure, reasons for the proposal, consideration
of impact and educational benefits can be found in the full proposal paper.
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Lochnell Primary School lies 3.6miles from Achaleven approximately and additional
8minutes travel. 
Other information
Evidence for this proposal was found in the Equality Evidence Finder, and in the
Guidance for the Fairer Scotland Act. 
Additional evidence was found in the School (Consultation) (Scotland) Act 2010, in
terms of legislative compliance. Education management circulars, 1.33 on capacity,
3.01 on admission and 3.09 on transfers were also consulted. The circular 3.23 on
child protection and safeguarding was also considered. 
The national policy of GIRFEC – Getting it Right for Every Child, was also
considered in the formation of this proposal as was the Argyll and Bute Education
vision and strategy, Our Children, Their Future. 
Gaps in evidence 
There are no gaps in evidence. 
Section 3: Impact of proposal 
Impact on service users: 
Negative No
impact
Positive  Don’t
know
Protected characteristics:     
Age  X   
Disability   X

Page 99

Negative No
impact
Positive  Don’t
know
Ethnicity  X   
Sex  X   
Gender reassignment  X   
Marriage and Civil Partnership  X   
Pregnancy and Maternity  X   
Religion  X   
Sexual Orientation  X   
Fairer Scotland Duty:     
Mainland rural population X    
Island populations  X   
Low income   X   
Low wealth  X   
Material deprivation  X   
Area deprivation  X   
Socio-economic background  X   
Communities of place X    
Communities of interest  X   
If you have identified any impacts on service users, explain what these will be.
Referring to the Fairer Scotland Act there could be potential negative impacts in
relation to
mainland rural and communities of place. The potential negative impact has been
considered below.
The reasons for the closure proposal have been set out in detail in the Options
Appraisal and Proposal Paper. 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
This has made due regard to potential impacts on the community, travel and the
children.
Since mothballing Achaleven Primary School has not been used for any community
event or meeting. The local community have access to Connel Village Hall
approximately 300yards from the school. 
Views have been gathered from stakeholders throughout the process. At the time of
the Options appraisal the majority of stakeholders favoured the closure of the school
due to low pupil numbers. All were keen to explore options for the future use of the
building should the closure go ahead. A group of local parents have explored the
option of an ELC and have discussed the closure process and their proposals with
members of the education central team. At the stakeholder meeting a local business

Page 100

were keen to discuss their proposal for future use of the business which included a
community hub should the proposal for closure go ahead. 
Until the proposal to close the school is fully agreed it is not possible to take forward
any alternative uses.
The further consultation had 1 written response and 3 members of the public
attended the public meeting. None opposed the closure of the school and 2
members of the public discussed possible use for business and community
purposes of the school building.
The school roll has been falling steadily for several years. The historical, and
continuing trend, is for parents to place their children in other larger local schools
which includes Lochnell Primary School. 
For a full account of the educational benefits of the closure proposal please refer to
the Options Appraisal and the Proposal Paper (see link above). 
Impact on travel and the environment has been further considered. Lochnell is 3.6
miles from Achaleven Primary School, approximately an additional 8 minutes travel
time. As the current travel arrangements for pupils have been in place since
mothballing there is no adverse effect on pupils or staff should the closure go ahead.
Views from stakeholders have not raised travel as a concern. Children from the
Achaleven catchment area have historically gone to other schools in the local area
with the associated travel. 
If any ‘don’t know’s have been identified, at what point will impacts on these
groups become identifiable? 
Impact on service deliverers (including employees, volunteers etc): 
Negative No
impact
Positive  Don’t
know
Protected characteristics:     
Age  X   
Disability  X   
Ethnicity  X   
Sex  X   
Gender reassignment  X   
Marriage and Civil Partnership  X   
Pregnancy and Maternity  X   
Religion  X   
Sexual Orientation  X   
Fairer Scotland Duty:

Page 101

Negative No
impact
Positive  Don’t
know
Mainland rural population X    
Island populations  X   
Low income   X   
Low wealth  X   
Material deprivation  X   
Area deprivation  X   
Socio-economic background  X   
Communities of place  X   
Communities of interest X     
If you have identified any impacts on service deliverers, explain what these
will be.
As before, the proposed closure of the school could adversely affect local
community people who may wish to volunteer as they would now need to travel.
However the children being in a larger school would mean that there will be more
opportunities for local volunteers and services to be involved and support the school
community.
Previously there were no regular volunteers in the school with parents helping when
requested for certain school activities.
As the school has been mothballed for over 2 years there would be no impact on
employees and staff would benefit from being in a larger school being able to work
collaboratively. 
If any ‘don’t know’s have been identified, at what point will impacts on these
groups become identifiable? 
How has ‘due regard’ been given to any negative impacts that have been
identified?
The proposal has taken due regard to any negative impacts of this proposal. In
looking at the educational benefits statement of this proposal these have been
considered. All information is contained in the proposal paper. 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
Section 4: Interdependencies

Page 102

Is this proposal likely to have any knock-on effects
for any other activities carried out by or on behalf of
the council? 
Yes 
Details of knock-on effects identified
Transport is already in place for children travelling from the Achaleven catchment
area to Lochnell Primary School, there is no knock on effects for any other activities
carried out by the council.
School estates would be involved in disposal/future use of the building should the
closure proposal go ahead. 
Section 5: Monitoring and review 
How will you monitor and evaluate the equality impacts of your proposal?
Should the proposal for the closure of Achaleven Primary School go ahead then the
Education Central Team will monitor the arrangements in place to ensure children
and families’ needs are met and make adjustments if required.

Page 103

APPENDIX 3
Argyll and Bute Council
Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access restricted to Elected Members
and Council Officers of Argyll and Bute Council. 
Proposal 
It is proposed that:
Education provision at Achaleven Primary School be discontinued with effect from 31st May 2024.
The catchment area of Lochnell Primary School shall be extended to include the current
catchment area of Achaleven Primary School. 
This part of the form must be completed for a valid response:
Name: (please print)
Dr Arlene Ditchfield (Chair of Dunbeg
Primary School Parent Council &
parent of 2 children in Dunbeg
Primary)
Address:
10 Tynribbie place, Tynribbie, Appin 
Post Code: PA38 4DS
I agree that my response can be made publicly available
Signature: 
Date: 23/10/23 
YOUR INTEREST: (please tick) 
Parent X
Child / 
Young Person  Staff            Other  * X 
Elected Member / MSP / MP    Member of Community Council 
*Other: (please specify) Parent and Chair of Dunbeg Primary School Parent council 
Please state your views on the proposal (continue overleaf if necessary) 
x

Page 104

I agree, although it’s a difficult decision, that Achaleven should be “mothballed” as there has not
been any pupils since 2021. However, I would like you to consider that instead of increasing the
catchment area for Lochnell the catchment area for Dunbeg primary is increased. Although
Lochnell is a great school my reasons and these also reflect the reasons discussed at the
Dunbeg Primary parent council AGM are as follows:
• Dunbeg Primary has a great capacity for pupils than Lochnell- I do understand that
perhaps the council feel that this capacity may be used by pupils from the new housing
development in Dunbeg however our roll call has not increased since this development
and as I understand it there are no more houses to be built in the short term.
• School inspection report- “Very good” results for Dunbeg Primary for the recent school
inspection report. Given the great result Connel parents may prefer that their children
attend Dunbeg. 
• Dunbeg primary also offers the same educational, social and wellbeing benefits as
Lochnell as supported by the school inspection report.
• Dunbeg primary school is closer to Connel than Lochnell and is on the same side of the
bridge.
• From a parent perspective where the parent is employed in Oban dropping off children
at Dunbeg is logistically simpler than Lochnell. 
Alternatively, could pupils continue to be zoned to either Lochnell or Dunbeg Primary School.

Page 105

APPENDIX 4 
Achaleven Primary School Public Consultation Meeting 
Held in Achaleven Primary School on 4 October 2023 at 6pm 
Panel 
Yvonne McNeilly, Education Policy Lead  Douglas Hendry, Executive Director  
Jen Crocket, Chief Education Officer/Head of Education-Wellbeing, Inclusion and Achievement
Wendy Brownlie, Head of Education – Performance and Improvement 
In attendance  
Graeme McMillan - Transformation Programme Manager 
Rachel Binnie – Acting Education Manager Lesley Allan
– Education Scotland    
Admin: 
Fiona Ferguson – Directorate Support Officer 
Laura Blackwood – Directorate Support Officer  
3 members of the public 
Welcome and introductions were made by Councillor McNeilly.   
Mr Hendry then outlined the objective of the meeting, to hear the views of the community, parents
and all other stakeholders. He set out the proposal which is being consulted on, that education
provision at Achaleven Primary School be discontinued with effect from 31 May 2024 and provided
information on the statutory process which the Education Service must follow and the timeline for
this.    
Ms Crocket and Mrs Brownlie then spoke to a presentation which included:- 
• The special considerations as Achaleven is a rural school. 
• Information on the pre-consultation stage and the options which were considered by officers.  
• How the views of the community, parents and children have been collected.  
• The timescale of the consultation process (31 August to 27 October).  
• The background to the proposal. 
• The national and Council priorities for Education.  
• Information on the school roll and projected figures. 
• The educational benefits of the proposal. 
• Feedback from the pupils who have been involved in the workshops.  
• Information on the reasons for placing requests to other schools in the local area.  
• The assessed impact of the proposal on a range of factors. 
Questions were then invited from the audience.

Page 106

Audience 
Two members of the audience introduced themselves and advised that they have been given notice
and to vacate their current business accommodation by March 31 2024. Should the proposal be
approved they are interested in using the school building for their business and, if there is a desire
from the community, to create a hub for community use.    
Panel Response 
The Council has no preconceived ideas about the use of the building once this process is completed,
and should closure of the school be the ultimate outcome. The Council have in the past have been
favourable to community proposals and would be able to pick this up once this process has been
completed and the outcome known. Previous buyouts/proposals submitted from communities were
referred to.    
Audience    
If for the any reason the majority of the community would be in favour of our proposal, to create a
community hub, would this carry more weight? If this were to make a difference we would make the
effort to speak and rally the community, is there merit/value in this?    
Is there any scope to bring forward the closing date of the school? 
Panel    
Yes, if the community were also behind this venture it would carry more weight, however it wouldn’t
rule out a more commercial approach by your firm/others. A commercial option is not something
which could be picked up before a decision were taken on the future of the school. If however, the
community were to get in touch we would be able to commence interim discussions about their plans
before the process is completed. 
The Council would be happy to look at a various options including sale, lease and partnerships.    
If you were looking for a short-term solution the Council has property in Oban which could be used
as an interim measure.    
As this is a rural school closure the timeframe includes a period for call in by Scottish Ministers and
therefore the proposed implementation date of 31 May 2024 cannot be altered. 
Audience 
Has been involved with a small group in looking at getting the school restarted. They were keen to
have a pre-school in the area and looked at various funding options, however over the years the

Page 107

numbers have dwindled and as a group will not object to the current proposal. This was a fantastic
school and sad to see it go. Lochnell was given a pre-school this one was not.    
Councillor McNeilly thanked everyone for their attendance and expressing their views which will be
feed into the consultation process and closed the meeting.

Page 108

APPENDIX 5 
Schools (Consultation) (Scotland) Act 2010 
Report by Education Scotland addressing educational aspects of
the proposal by Argyll and Bute Council to close Achaleven Primary
School and realign its catchment area to Lochnell Primary School. 
November 2023

Page 109

Introduction 
1.1  This report from Education Scotland has been prepared by His Majesty’s Inspectors of 
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of Argyll and Bute Council’s proposal to close Achaleven Primary School and realign
its catchment area to Lochnell Primary School. Section 2 of the report sets out brief details of the
consultation process. Section 3 of the report sets out HM Inspectors’ consideration of the
educational aspects of the proposal, including significant views expressed by consultees. 
Section 4 summarises HM Inspectors’ overall view of the proposal. Upon receipt of this report, the
Act requires the council to consider it and then prepare its final consultation report. The council’s
final consultation report should include this report and must contain an explanation of how, in
finalising the proposal, it has reviewed the initial proposal, including a summary of points raised
during the consultation process and the council’s response to them. The council has to publish its
final consultation report three weeks before it takes its final decision. Where a council is proposing
to close a school, it needs to follow all statutory obligations set out in the 2010 Act, including
notifying Ministers within six working days of making its final decision and explaining to consultees
the opportunity they have to make representations to Ministers and the special provisions that apply
to proposals to close a rural school.    
1.2  HM Inspectors considered: 
• the likely effects of the proposal for children of the school; any other users; children likely to
become pupils within two years of the date of publication of the proposal paper; and other
children in the council area; 
• any other likely effects of the proposal; 
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and 
• the educational benefits the council believes will result from implementation of the proposal, 
and the council’s reasons for coming to these beliefs. 
1.3  In preparing this report, HM Inspectors undertook the following activities: 
• attendance at the public meeting held on 4 October 2023 in connection with the council’s
proposals; 
• consideration of all relevant documentation provided by the council in relation to the proposal,
specifically the educational benefits statement and related consultation documents, written
and oral submissions from parents and others; and 
• visits to the site of Lochnell Primary School, Dunbeg Primary School and Oban High School,
including discussion with relevant consultees. 
1.4 As the proposal will lead to the closure of a rural school(s), HM Inspectors also took
account of the council’s consideration of any reasonable alternatives to closure of Achaleven

Page 110

Primary School, the likely effect on the local community and the likely effect of any different
travelling arrangements of the proposed closure. 
Consultation process 
2.1 Argyll and Bute Council undertook the consultation on its proposal(s) with reference to the
Schools (Consultation) (Scotland) Act 2010. 
2.2 In June 2021, Argyll and Bute Council approved the mothballing of Achaleven Primary School.
In August 2022, the council agreed to undertake a preliminary consultation and options appraisal
required by the Schools (Consultation) (Scotland) Act 2010. The council considered four options
including the reopening of Achaleven Primary School, continued mothballing with pupils zoned to
either Lochnell or Dunbeg Primary School, and the closure and realignment of the catchment area
to Dunbeg Primary School. In August 2023, the council agreed to proceed with the fourth option, to
consult on a proposal to permanently discontinue education provision at Achaleven Primary School
from 31 May 2024, and to realign the catchment area to Lochnell Primary School. 
2.3  The council undertook the consultation between 31 August and 27 October 2023. The
proposal notice and a summary was advertised in the local press and sent to relevant
consultees. The full proposal document was published on the council website. Argyll and Bute
Council held a public meeting at Achaleven Primary School on 4 October 2023. This was
attended by three members of the local community, including one parent, and council officials.
Most of the discussion focused on the potential future use of the school building if the closure is
approved. The council received one response to the online consultation. 
2.4 Children attending Lochnell and Dunbeg Primary Schools were also consulted by council
officers, including children who live in the Achaleven catchment area. Children were given the
opportunity to provide their views. Most children in both primary schools thought it was a good idea
to close the Achaleven Primary School. They particularly enjoy the social aspects of being in the
larger schools, their school’s facilities, and more variety of staff. They suggested several alternative
uses for the building if it were to close. 
Educational aspects of proposal 
3.1 The council has set out clearly the educational benefits arising from the proposal to close
Achaleven Primary School and realign its catchment area to Lochnell Primary School. HM
Inspectors agree that there may be educational benefits for children. These include participation
in a broader range of experiences and opportunities to learn, develop and socialise with a wider
group of peers. The council has highlighted one negative aspect around additional travel.
However, HM Inspectors agree that the positive aspects of the proposal outweigh this negative
aspect.    
3.2 HM Inspectors met with primary school children and staff, and a few young people in Oban High
School who had previously attended Achaleven Primary School. All of these stakeholders

Page 111

understand why the council is proposing to permanently close the school. The young people that
met with HM Inspectors have fond memories of their time at Achaleven Primary School and recall
positive learning experiences that prepared them well for secondary school. They would like the
primary school to remain open to provide more choice. However, they accept that in the current
context reopening the school is not practical. Most primary school children and staff that met with
HM Inspectors support the proposal. Children enjoy and benefit from the learning environment and
experiences provided in Lochnell and Dunbeg Primary Schools. Both schools have sufficient
capacity to meet learners needs. 
3.3 As the proposal will lead to the closure of a rural school, HM Inspectors also took account of the
council’s consideration of the factors to which it should have special regard. The council took
appropriate steps and due consideration of alternatives before consulting on the proposal to
permanently close Achaleven Primary School. The additional travel time resulting from the school
closure is relatively short and none of the stakeholders that HM Inspectors met with had any
significant concerns about the added journey time. A few stakeholders suggested alternatives to the
proposed new catchments. This included that a more natural boundary would be to divide the school
catchments at Connel Bridge. While accidents and bridge repairs are not a frequent occurrence,
aligning the school catchments at this location could help to mitigate any potential negative impact
on school attendance if the bridge is closed. Another suggestion is to realign the full catchment to
Dunbeg Primary School, which currently has sufficient capacity to accommodate children from the
Achaleven catchment. Should the council decide to permanently close 
Achaleven Primary School, stakeholders would like the existing building and adjoining grounds to
be repurposed for community use.    
Summary 
HM Inspectors agree that there are potential educational benefits for children arising from the
council’s proposal to close Achaleven Primary School. For example, that there maybe more
opportunities for them to learn, develop and socialise with a wider group of their peers. The
proposed alignment to Lochnell Primary School, an alternative alignment to Dunbeg Primary
School, or a split between the two schools offers similar educational benefits. The council should
consider the alternative views on the school catchment alignment put forward during the
consultation before reaching a final decision. The council should also work with the local
community, including children and young people, to consider any future use for the school and
grounds should the proposal to close be agreed. 
HM Inspectors 
November 2023

Page 112

APPENDIX 6 
Achaleven Primary School Proposed Closure
Pupil Consultation Response 
Achaleven catchment children at Lochnell and Dunbeg Primary School will have the opportunity to
discuss the proposed school closure and their comments are recorded below.
Lochnell Pupil Consultation 29/09/23
19 children, nearly all children attended Lochnell ELC
8 children knew Achaleven Primary School. A primary 6 child was aware of the proposed closure
and meeting because she had seen the poster in her street.
No children had attended Achaleven with all pupils starting in P1 (with the exception of 2 children
who had moved into the area and had started Lochnell in a different year group)
Dunbeg Primary School Consultation 02/10/23
8 Pupils, nearly all of the children attended Dunbeg ELC
1 pupil, currently P6, had attended Achaleven prior to mothballing. The other children had attended
Dunbeg since Primary 1. 
Through the use of a power point children were taken through the reason for the consultation and
given the opportunity to give their views. 
Children had the opportunity to give a view on Lochnell/Dunbeg and a view on Achaleven as a
smaller school.
Very similar views were given by all children recorded below, the important things about being in
their larger schools were having friends to play with and making new friends and having more and
different staff.

Page 113

Achaleven Lochnell/Dunbeg
If too many children went to Achaleven they
may not fit in.
Would not make as many friends/Would not
have as many teachers.
Mixed classes would not like to be in a
composite, like having own primary.
Might not get to play with as many toys.
Some people might like smaller schools.
If someone didn’t want to play with you, you
might get lonely.
More room in a bigger school
Pupil who had attended Achaleven is glad she
has moved to Dunbeg, having more teachers is
better. There is a large garden at Achaleven but
it is not like the woodland at Dunbeg.
Not many staff.
Would be ok for those that liked quieter spaces.
One child said they would like to go but liked his
friends in school and liked to play with his
friends so decided he wouldn’t move.
Lots of people to play with.
Nice, good and welcoming teachers.
Lots of teachers, not just one teaching all day.
Learn more and new things.
Make new friends and like making friends.
Lots of books.
Good food.
Everyone fits in. 
The school (Lochnell) has 2 football pitches and
a basketball pitch. If someone doesn’t want to
play with another person or that game they can
go somewhere else.
Dunbeg is getting a new playground. 
Children’s views on proposed closure
All children in consultation group liked their school, teachers and friends.
No child wanted to move school they all wanted to stay in the school they were in (this included
child who initially said he would like to go to Achaleven).
P5 child didn’t know if the school should close but raised a concern if someone could not travel to
Lochnell.
P1 child felt it should stay open as if their school was closed they would feel sad.
1 child said it could be kept open for former pupils to visit.
Most pupils in both schools felt it was a good idea to close (‘don’t think it should be a school’) as
no-one is going and the money saved could be shared.
Achaleven shouldn’t be opened as it is next to a main road and children may go on the road. 
Suggestions for what to do if the school closed:
It could be something else: - library, storage, house, church or break apart and turn into a big
clock.
Wasting money, Achaleven could be sold and money used to buy something else.