Classification: OFFICIAL
Argyll and Bute Community Planning
Partnership 
Oban, Lorn and the Isles Area Community
Planning Group 
12 February 2025 
Mainland Ferries Report 
Summary 
The report is for noting and provides an update following presentation of the
same report at the Environment, Development and Infrastructure meeting on
the 19th December 2024 
1. Purpose 
1.1 The report introduces members to the ‘Argyll & Bute Council
Mainland Ferries Study – Comparative Analysis of Options for
Council-run ferries’ carried out by Caledonian Economics
(Mainland Ferries Study) at Appendix 1. 
1.2 The anticipated Islands Connectivity Plan and Community Needs
Assessments being produced by Transport Scotland, excludes
local authority run ferries from proposals.  This study seeks to
address the gap left by this exclusion and looks at options for the
future of lifeline services to Easdale and Luing 
2. Recommendations   
2.1  Area CPG members are requested to:  
• Note the content of this report.
• Agree to receive further updates on progress of the next stage
of the study.
3.        Detail 
3.1 On 13 October 2022 Policy and Resources Committee agreed to
allocate £100k of Crown Estates Funds to a feasibility study and
specification work for pier infrastructure at Ellenabeich and Easdale
which would support the ongoing provision of the council ferry
service. 
3.2 A sensible starting position for the feasibility study was a baseline
study into the current services being provided. Economies of scale
enabled the inclusion of the Luing service at the same time,

Page 2

Classification: OFFICIAL
particularly as the Luing Community Council had separately
commenced a ‘Participation Request’ to investigate improvements
to the Cuan service. 
3.3 Caledonian Economics were engaged to carry out this work at a cost
of £10k leaving £90k for the remaining detailed study. 
3.4 The study at Appendix 1 therefore concentrates on the current
provision of lifeline services covering the islands of Luing and
Easdale. Both services use aging vessels and infrastructure, which
do not reach modern standards and expectations, to support a
variety of users within the communities 
3.5 The study was presented to members of the Environment,
Development and Infrastructure Committee on the 19th December
2024 and recommended Members:
• Thank the Easdale and Luing community council
representatives and residents for the high level of
engagement and return regarding the study.
• Discuss the contents and implications of the Mainland Ferries
Study (Appendix 1).
• Approve the continuation of the feasibility study to progress a
business case for the provision of infrastructure options to
Easdale, including fixed links.
• Approve the inclusion of options to Luing in the feasibility
study to continue to take advantage of economy of scale, and
• acknowledged the ongoing need to continue to engage with
residents and representatives of the communities on the Isle
of Luing, Isle of Seil, and Easdale, in relation to council run
ferry services and infrastructure. 
3.6 This decision was approved by members and is detailed in the
printed minutes at Appendix 2
4. Conclusion 
4.1 The study provides an overview of past and current service levels
and makes recommendations for the future infrastructure needs in
both locations. It Page 56 balances financial estimates with public
opinion to suggest options that are available and viable for council
purposes.. 
4.2 Officers will now further investigate the recommended options
including potential fixed links to replace both ferry crossings by
preparing a business case for each location.

Page 3

Classification: OFFICIAL
5.  SOA Outcomes 
5.1 Policy – None. 
5.2 Financial – None. 
5.3 Legal – None. 
5.4 HR – None. 
5.5 Fairer Scotland Duty: 
5.5.1 Equalities - protected characteristics - Vessel and Infrastructure
accessibility (Equalities Act). 
5.5.2 Socio-economic Duty - Lifeline ferries with no other current
means to travel to / from islands. 
5.5.3 Islands - Education, transport, health, business. 
5.6 Climate Change – Effect of increasing water levels and extreme weather
events on the infrastructure and provision of service. 
5.7 Risk - Vessel age and current infrastructure conditions. 
5.8 Customer Service - Complaints about current service levels will increase
as vessels age. 
5.9 The Rights of the Child (UNCRC) - Education and social access to
mainland facilities and services. 
For further information please contact:   
Kelly McKellar, 
Project Manager – Piers and Harbours, Argyll and Bute Council
Tel 01546 604 214 
Appendix 1 – Mainland Ferries Report
Appendix 2 – EDI Committee – Printed Minutes 191224