Page 1

PLANNING
AUTHORITY’S
SUBMISSIONS

Page 2

Chief Executive's Service
Renfrewshire House
Cotton Street, Paisley, PA1 1WB
//www.renfrewshire.gov.uk
My Ref: 
Contact: James Weir
Telephone: 
Email: dc@renfrewshire.gov.uk
Date: 9 September 2022 
Mr Graham Bell
5 Victoria Gardens
Kilmacolm
PA13 4HL 
Proposal: Formation of extension to watersports storage compound with associated
boundary fence, access and road
Location: Ground A, Lochlip Road, Lochwinnoch, , 
Application Type: Planning Permission-Full
Application No: 22/0414/PP 
Dear Sir/Madam, 
NOTIFICATION OF CONSENT 
The Council has approved your application, details of which are given above. I enclose a
Consent Notice, which also lists the conditions attached to the approval, together with a copy of
your submitted plans duly endorsed and the Report of Handling. 
I would specifically draw your attention to the notes attached to the consent regarding the
interests of Scottish Water and The Coal Authority. 
Please note that the full reasons as to whether the above Proposal is in accordance with the
Development Plan (as required by section 37(2A) of the Town and Country Planning (Scotland)
Act 1997) are found in the Report of Handling for your application which is attached as
Appendix 1 and referred to for its terms which are deemed to be repeated, incorporated and
forming part of this Decision Notice. 
Yours faithfully, 
Alasdair Morrison
Head of Economy and Development

Page 3

Notes Regarding Scottish Water Interests 
a. It is the responsibility of the applicant to check Scottish Water's record plans regarding the
position of its water and/or waste water assets prior to any work commencing on site.  Plans
available on written request from the Property Searches Department, Bullion House, Dundee,
DD2 5BB. 
b. If a water main or sewer is affected, then no building shall be erected over or in such a way as to
interfere with Scottish Water's right of access.  The applicant must contact Scottish Water
Operations, Technical Support team to ascertain what measures should be taken to safeguard
this apparatus. 
c. Scottish Water's current minimum level of service for water pressure is 1.0 bar or 10m head in the
public main.  Any property which cannot be adequately serviced using this pressure may require
to have private pumping arrangements installed subject to compliance with the current water
bylaws. 
d. The applicant must ensure that any new internal or external drain is connected to the correct
drain or sewer.

Page 4

Making a better future for people  
and the environment in mining areas 
200 Lichfield Lane
Mansfield
Nottinghamshire
NG18 4RG
T: 01623 637 119 (Planning Enquiries) 
E: planningconsultation@coal.gov.uk
W: www.gov.uk/coalauthority
Standing Advice 
The proposed development lies within a coal mining area which may contain unrecorded coal
mining related hazards.  If any coal mining feature is encountered during development, this should
be reported immediately to the Coal Authority on 0345 762 6848. 
Further information is also available on the Coal Authority website at:
www.gov.uk/government/organisations/the-coal-authority 
Standing Advice valid from 1st January 2021 until 31st December 2022

Page 5

Page 1 of 5 
GRANT Consent subject to the conditions 
Ref.  22/0414/PP     
DECISION NOTICE 
Town and Country Planning (Scotland) Act 1997
Planning etc. (Scotland) Act 2006
Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013     
TO Mr Graham Bell
5 Victoria Gardens
Kilmacolm
PA13 4HL 
With reference to your application registered on 13 June 2022 for Planning Consent for the
following development:- 
PROPOSAL
Formation of extension to watersports storage compound with associated boundary fence,
access and road 
LOCATION
Ground A, Lochlip Road, Lochwinnoch, 
DECISION
The Council in exercise of their powers under the above Acts and Orders, having considered
the above proposal, the plans endorsed as relating to it and the particulars given in the above
application hereby:- 
GRANT Consent subject to the conditions listed on the reverse/paper apart. 
PLANS AND DRAWINGS
The plans and drawings relative to this permission are those identified in the Schedule of
Plans/Drawings attached as a paper apart and forming part of this Decision Notice. 
NOTE: It should be understood that this permission does not carry with it any necessary
consent or approval for the proposed development under any other statutory enactments, for
example Building (Scotland) Acts, Roads (Scotland) Act 1984 etc. 
Dated: 9 September 2022 
Signed  
Appointed Officer
on behalf of Renfrewshire Council

Page 6

Page 2 of 5 
Ref. 22/0414/PP 
CONDITIONS AND/OR REASONS ATTACHED TO THIS DECISION 
PAPER APART 
TERMS AND CONDITIONS 
Reason for Decision 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions/Reasons 
1. That all construction work associated with the implementation of the development
hereby approved shall be undertaken in accordance with the Construction Method
Statement dated the 23rd August 2022.   
Reason: To reduce pollution risk in the interests of protecting the water environment 
2. That prior to the commencement of development on site, the developer shall provide a
plan for the written approval of the Planning Authority detailing the location of the path
network to the northeast of the proposed storage compound within the area demarcated
by a blue line on the approved location plan. Should the development be found to
encroach upon the path network the plan shall provide details of the realignment of the
path network and when works associated with the realignment of the path will be
undertaken. Any works associated with the realignment of the path shall thereafter be
undertaken in accordance with the approved plan.   
Reason: To ensure the existing path network is protected in the interests of maintaining
connections between the site and the national cycle network.   
3. That prior to the commencement of development on site, the developer shall provide a
species protection plan for the written approval of the Planning Authority. The plan shall
set out measures to ensure that otters and nesting birds are protected during the
construction process, and shall include provision for site surveys prior to work
commencing and also for cessation of works should any otters or nesting birds be
encountered. The development shall thereafter be implemented in accordance with the
approved plans.   
Reason: To ensure that appropriate measures are put in place to ensure otters and
nesting birds are protected during the implementation of the development. 
4. That prior to the commencement of development on site, the developer shall provide a
plan and further details for the written approval of the Planning Authority specifying all

Page 7

Page 3 of 5 
earth moving, associated level changes and wall retention required along the north
western boundary of the site. The plan shall specifically detail these works in relation to
the tree protection zones associated with the trees along the north western boundary.
The plan shall take cognisance of the recommendations within BS 3857 (2012) Trees in
Relation to Design, Demolition and Construction. Only the works detailed in the
approved plan shall thereafter be implemented on site including any measures to protect
the existing trees.   
Reason: To ensure the trees along the north western boundary of the site are protected
in the interests of natural heritage and visual amenity.

Page 8

Page 4 of 5 
Notification of initiation of development
Notice under Section 27A(1) Town and Country Planning (Scotland) Act 1997
1. A person who intends to carry out development for which planning permission has been given must, as
soon as practicable after deciding on a date on which to initiate the development and in any event before
commencing the
development, give notice to the planning authority as to that date. 
2. The notice to be given in accordance with section 27A(1) of the Act by a person intending to carry out
development must–
(a) include the full name and address of the person intending to carry out the development;
(b) state if that person is the owner of the land to which the development relates and if that person is not
the owner provide the full name and address of the owner;
(c) where a person is, or is to be, appointed to oversee the carrying out of the development on site,
include the name of that person and details of how that person may be contacted; and
(d) include the date of issue and reference number of the notice of the decision to grant planning
permission for such development. 
3. Your attention is drawn to Section 123(1) of the Town and Country Planning (Scotland) Act 1997 set
out below. 
“123 Expressions used in connection with enforcement 
(1) For the purposes of this Act— 
(a) carrying out development without the required planning permission, or 
(b) failing to comply with any condition or limitation subject to which planning permission has been
granted, 
constitutes a breach of planning control.”
“27B Notification of completion of development 
(1) A person who completes development for which planning permission has been given must, as soon
as practicable after doing so, give notice of completion to the planning authority.
(2) If an application to a planning authority for planning permission discloses, in the opinion of the
authority, that the development in question is to be carried out in phases then any such permission
granted is to be granted subject to a condition, imposed under section 37(1)(a) in respect of each phase
except the last (notice of the completion of which is to be given under subsection (1)), that as soon as
practicable after the phase is completed the person carrying out the Advisory regarding the Duration of
Planning Permission in Principle, Planning Permission and Listed Building Consent.
The following is advisory only and developers should satisfy themselves by reference to the relevant
legislation if they are in any doubt regarding the duration of the permission
Planning Permission in Principle - Section 59 of the Town and Country Planning (Scotland) Act 1997
generally specifies that an application for approval of matters specified in conditions (requisite approval)
must be made before the latest of (i) the expiration of 3 years from the date of grant of permission; (ii) the
expiration of 6 months from the date an application for the requisite approval was refused; and (iii) the
expiration of 6 months from the date on which an appeal against such refusal was dismissed. A planning
permission in principle generally lapses on the expiration of 2 years from the date of the requisite
approval being obtained unless the development to which the permission relates is begun before that
expiration.
Planning Permission and Listed Building Consent - Sections 58(1) and (3) of the Town and Country
Planning (Scotland) Act 1997 generally specify that planning permission and listed building consent will
expire after 3 years from the date on which it is granted unless the development to which it relates has
been started, or that a different period has been specified in any condition attached to the permission.

Page 9

Page 5 of 5 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997 
1. If the applicant is aggrieved by the decision to refuse permission for or approval required by a
condition in respect of the proposed development, or to grant permission or approval subject to
conditions, the applicant may require the planning authority to review the case under section
43A of the Town and Country Planning Act (Scotland) Act 1997 within three months beginning
with the date of this notice. The notice of review should be addressed to Head of Legal and
Democratic Services, Renfrewshire House, Cotton Street, Paisley PA1 1PR. 
2. If permission to develop land is refused or granted subject to conditions and the owner of the
land claims that the land has become incapable of reasonably beneficial use in its existing state
and cannot be rendered capable of reasonably beneficial use by the carrying out of any
development which has been or would be permitted, the owner of the land may serve on the
planning authority a purchase notice requiring the purchase of the owner of the land's interest in
the land in accordance with Part 5 of the Town and Country Planning (Scotland) Act 1997.

Page 10

Appendix 1 
RENFREWSHIRE COUNCIL  Application No: 22/0414/PP
CHIEF EXECUTIVE’S SERVICE
RECOMMENDATION OF PLANNING APPLICATION
Regd:26 June 2022  
Applicant Agent
Mr Graham Bell
5 Victoria Gardens
Kilmacolm
PA13 4HL 
Nature of Proposals
Formation of extension to watersports storage compound with associated boundary fence, access
and road 
Site
Ground A, Lochlip Road, Lochwinnoch, 
Description 
This application seeks planning permission for an extension to a watersports storage compound
with associated boundary fence, access and road at Castle Semple Visitor Centre in
Lochwinnoch. The visitor centre is located on the northern bank of Castle Semple loch. It is bound
by the national cycle network to the north with the village beyond. 
Castle Semple comprises of the main visitor centre building with associated club house and
pontoons. There is an existing area of car parking to the southwest. The land to the northeast is
already partly used for storage, and there have been previous applications in 2012, 2018 and
2019 to incrementally expand this storage area. 
The proposed development includes these existing areas plus a further area of expansion to the
northeast which will create an overall storage area of 7,500 square metres. The storage areas will
be formed by scraping back the existing grassland and laying hardcore. The land slopes gently
uphill from southeast to northwest, and gabion baskets will be used for retention where necessary
to ensure the ground can be levelled appropriately. The storage area will then be enclosed with
2.4m high Vmesh security fencing. Within the storage area there will be a mix of racking to store
the various boats and containers for other equipment. An indicative layout of the storage area has
been provided in this regard.   
This application also includes road access which continues northeast past the proposed storage
areas. Although a site visit indicates that the road has already been formed.   
History 
Application No: 19/0431/PP
Description: Formation of extension to water sports storage compound and erection of boundary
fence
Decision: Grant. 
Application No: 18/0052/PP

Page 11

Description: Formation of extension to water sports storage compound and siting of storage
buildings.
Decision: Grant. 
Application No: 12/0649/PP
Description: Erection of single storey building (Class 11) with associated access.
Decision: Granted subject to conditions. 
Application No: 12/0180/PP 
Description: Change of use from agricultural land to recreational use to include expansion of boat
storage compound and erection of 2.4m high security fence. 
Decision: Granted subject to conditions. 
Policy and Material Considerations 
Adopted Renfrewshire Local Development Plan 2021 
Policy ENV1 – Green Belt
Policy ENV2 – Natural Heritage
Policy ENV4 – The Water Environment
Policy I3 – Flooding and Drainage 
New Development Supplementary Guidance 2021 
Delivering the Environment Strategy – Green Belt, Natural Heritage and The Water Environment
Delivering the Infrastructure Strategy – Flooding and Drainage
Delivering the Places Strategy – Regional Parks 
Material Considerations 
Publicity 
The Council has undertaken neighbour notification in accordance with the requirements of
legislation. 
Objections/Representation 
None received. 
Consultations 
NatureScot – No objection subject to condition regarding the implementation of works in
accordance with the Construction Method Statement. Also recommend that species protection
plans are prepared for otters and breeding birds. 
Communities & Housing Services - (Environmental Protection Team) – No comments. 
Environment & Infrastructure Services - (Roads) – No objection subject to conditions regarding
the monitoring of parking provision and the safeguarding of existing connections to the national
cycle network.

Page 12

Informative to be added: N   
Assessment 
Policy ENV1 states that development within the green belt will only be considered acceptable
where it can be demonstrated that it is compatible with the provisions of the new development
supplementary guidance. 
The supplementary guidance lists a range of developments that are considered appropriate within
the green belt in principle. This includes recreational uses compatible with a natural environment
setting, and tourism development. 
Castle Semple Visitor Centre is a well-established location for recreational activities associated
with the loch. The storage of boats and other equipment to support these activities is a
fundamental part of the Castle Semple development, and there is already a boat storage
compound at the site. Further development of this nature will be commensurate with the waterside
setting, and will support Castle Semple as a recreation destination. The development is therefore
considered to be appropriate in principle 
All developments within the green belt must thereafter be assessed against the green belt
development criteria. 
In this instance there will be no loss of agricultural land and no impact on wild land. 
In terms of traffic and access, the Environment and Infrastructure Service has offered no
objections to the development. As noted above the access to the proposed storage area and the
associated road to the northeast of the site has already been formed. The infrastructure does not
have a significant impact on visual amenity or landscape character and is commensurate with the
built up nature of the visitor centre. 
It is not anticipated that the development will have a significant effect on public water supply. 
In terms of effect on water courses from pollution risk, it is noted that NatureScot initially raised
concerns over sediment and other pollutants entering the loch during the construction period. The
applicant has therefore prepared a construction management plan to demonstrate how this
potential pollution issue will be managed. NatureScot have confirmed that they have no objection
to the development subject to the construction management plan being implemented on site
during the construction phase.   
The Environment and Infrastructure Service has requested that existing connections between the
visitor centre and the national cycle network are retained. During the site inspection it was noted
that a path has been cut through the grass on the eastern edge of the existing storage area to
provide an informal link to the cycle network. 
The proposed development will encroach upon this path. However, the applicant has advised that
the path can be realigned if necessary to ensure the link is retained. A condition can be attached
to ensure a plan showing the realigned route is submitted, with the route then brought into use
thereafter in a timely manner. The applicant owns the land to the north east of the proposed
storage area, and this provides flexibility for route options without land ownership constraints.

Page 13

The proposed development constitutes the managed expansion of an existing and well-
established facility. There is already a storage area at the site, and expansion of this area will not
be incongruous with regard to landscape character. There is a line of mature trees which provide
a landscape backdrop to the site. The use of the area for storage of boats is also commensurate
with the waterside location. The proposed boundary fencing also matches the fencing which
bounds the existing storage area. 
Castle Semple Loch is designated as a Site of Special Scientific Interest (SSSI). As noted above
the potential impact on the loch with respect to pollution risk will be managed via a construction
management plan. 
In terms of potential impact on protected species, NatureScot have also recommended that
species protection plans are prepared regarding otters and nesting birds. A condition will be
attached to ensure that these plans are implemented on site to safeguard these protected
species. 
In view of the above assessment, I am satisfied that the proposed development complies with the
green belt development criteria. It is therefore considered to comply with Policy ENV1. 
The above assessment has also demonstrated that the development complies with Policies ENV2
and ENV3, with measures put in place to manage the potential impact on protected species and
the SSSI designated Semple Loch. 
It is noted that due to the gradient of the site the most significant earthworks will take place along
the north western boundary of the site adjacent to the row of mature trees that mark the edge of
the cycle network. A condition can be used to request further details of the earthworks and any
associated wall retention to ensure the root protection zones associated with the trees are not
impacted. This will ensure that the trees are protected during the construction process. 
In view of the above, I am satisfied that the development complies with Policies ENV2 and ENV3. 
Policy I3 states that new development requires to avoid areas susceptible to flooding. The south
eastern half of the site is within the flooding extents associated with the Semple Loch. 
However, in this instance the proposed water sports storage compound is a water compatible use
with respect to SEPA’s land use vulnerability guidance. There is no sleeping or other residential
accommodation proposed as part of the development. 
On this basis I am satisfied that the development is acceptable within the flood risk area, and is
complaint with Policy I3 on this basis. 
The supplementary guidance on regional parks states that development within Clyde Muirshiel
Regional Park will only be permitted where it can be demonstrated the assessment criteria have
been met. 
In this instance, the development is for a leisure use. 
Nature conservation and landscape character matters have been considered above. 
It is not anticipated that the development will cause significant conflict with neighbouring land
uses.

Page 14

A condition will be applied to ensure existing active travel networks are maintained. Habitat
networks will be protected via adherence to the construction management plan. 
The proposed development is commensurate with the location in terms of its scale and
appearance, and there will not be a significant detrimental impact on the visual amenity of the
area. 
Finally, the development does not prevent recreational access to the area. It is anticipated that the
development will enhance recreational access by improving storage of boats and other equipment
at the site. 
Regarding the consultation responses not already addressed in the above assessment, it is noted
that the Environment & Infrastructure Services have requested a condition regarding the
monitoring of car parking capacity at the site. 
Car parking capacity is primarily an operational issue at the site. The proposed development will
not result in the loss of any existing parking capacity, and the applicant has advised that the
development will primarily allow for more efficient storage of boats and equipment as opposed to
generating a significant increased demand which may in turn cause issues with parking. On this
basis it is not necessary to apply a condition to the permission requiring monitoring of car parking
capacity at the site.         
Index of Photographs
No site visit was undertaken for this application. 
RECOMMENDATION
Grant subject to conditions 
Reason for Decision 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That all construction work associated with the implementation of the development hereby
approved shall be undertaken in accordance with the Construction Method Statement dated the
23rd August 2022. 
Reason: To reduce pollution risk in the interests of protecting the water environment 
2. That prior to the commencement of development on site, the developer shall provide a plan for
the written approval of the Planning Authority detailing the location of the path network to the
northeast of the proposed storage compound within the area demarcated by a blue line on the
approved location plan. Should the development be found to encroach upon the path network the
plan shall provide details of the realignment of the path network and when works associated with
the realignment of the path will be undertaken. Any works associated with the realignment of the
path shall thereafter be undertaken in accordance with the approved plan.

Page 15

Reason: To ensure the existing path network is protected in the interests of maintaining
connections between the site and the national cycle network.   
3. That prior to the commencement of development on site, the developer shall provide a species
protection plan for the written approval of the Planning Authority. The plan shall set out measures
to ensure that otters and nesting birds are protected during the construction process, and shall
include provision for site surveys prior to work commencing and also for cessation of works should
any otters or nesting birds be encountered. The development shall thereafter be implemented in
accordance with the approved plans. 
Reason: To ensure that appropriate measures are put in place to ensure otters and nesting birds
are protected during the implementation of the development. 
4. That prior to the commencement of development on site, the developer shall provide a plan and
further details for the written approval of the Planning Authority specifying all earth moving,
associated level changes and wall retention required along the north western boundary of the site.
The plan shall specifically detail these works in relation to the tree protection zones associated
with the trees along the north western boundary. The plan shall take cognisance of the
recommendations within BS 3857 (2012) Trees in Relation to Design, Demolition and
Construction. Only the works detailed in the approved plan shall thereafter be implemented on site
including any measures to protect the existing trees. 
Reason: To ensure the trees along the north western boundary of the site are protected in the
interests of natural heritage and visual amenity.   
Alasdair Morrison
Head of Economy and Development

Page 16

Applicant:   Mr Graham Bell  Ref. No: 22/0414/PP
Site:           Ground A
Lochlip Road
Lochwinnoch 
Officer:    James Weir 
Documents 
Document Document Attached
(Admin)

Document Attached
and Signed

Decision Letter  
Decision Notice  
Appendix 1 – Report of Handling    
Plans to be stamped 
Drawing Number Drawing Title Checked
Paper/DMS 
(Officer)

Stamped
DMS
(BS)

/ Location Plan as Proposed  
/ Block Plan 1:500  
/ Site Plan 1:1250  
/ Site Plan 1:200  
/ Site Plan 1:200  
/ Location Plan as Existing                               
Officers Initials: JW   Business Support Initials: __DM_____

Page 17

Location Plan 1:2000 @A3 as existing 
CSSC StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Club Compounds fo Castle Semple Sailing Club (CSSC), St Winnoch Angling Club (StWAC), West Coast Paddlers (WCP) and Castle Semple Rowing Club (CSRC) 
Castle Semple Loch

Page 18

Trailer parking
Trailer parking 
Rigging area 
Boat storage racks 
Shed
Boat storage racks
Car Parking Car Parking
Private Car Parking
Container=kit store
Container=kit
store
Trailer
parking
Trailer
parking
53000
39000
39000 19660
39200
26166 
19660
Site Plan 1:200 @A3
StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Sports Club Compounds
for St Winnoch Angling Club (StWAC), West Coast
Paddlers (WCP) and Castle Semple Rowing Club (CSRC)
Private Car Parking Private Car Parking
26834

Page 19

Container
Rescue Boat 1
Site Plan 1:200 @A3
CSSC sports compound,   = sailing
boat stored on a trailer on grass /
hardcore 
Castle Semple Lochside Field Sports Club
Compounds for Castle Semple Sailing
Club (CSSC) and Clyde Windsurfing & SUP
Club (CW&SUPC).  St Winnoch Angling
Club (StWAC) border shown to right side
of Plan 
Adjoining StWAC compound area
SW edge (see separate 1:200
plan)
Sail Store
Container
Container 
Rescue Boat 2
Clubhouse  = Container 
Container WC 
Container
64600
43342
56521
Sail Store Container
Equipment Container
Covered
admin
area
WC
19600
30355

Page 20

Site Plan 1:1250 @A3.                                                                
CSSC CW&SUPC,  StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Sports Club Compounds for Castle Semple Sailing Club (CSSC), Clyde Windsurfing & SUP Club (CW&SUPC), St Winnoch Angling
Club (StWAC), West Coast Paddlers (WCP) and Castle Semple Rowing Club (CSRC) 
53000
143800
3000

Page 21

Location Plan 1:2000 @A3 as proposed 
CSSC StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Sports Club Compounds for Castle Semple Saling Club (CSSC), Clyde Windsuring & SUP Club,  St Winnoch Angling Club (StWAC), West Coast Paddlers (WCP)
and Castle Semple Rowing Club (CSRC) 
Castle Semple Loch

Page 22

`
22500
22500
22500
53000
3000
39000
22500
22500
39200
22500
22500
26166
Block Plan 1:500 @A3
StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Sports Club Compounds for St Winnoch Angling Club
(StWAC), West Coast Paddlers (WCP) and Castle Semple Rowing Club (CSRC)
2000
44342
14380
0
`
`
v
v
v
Block Plan 1:500 @A3
CSSC StWAC WCP & CSRC sports compounds
Castle Semple Lochside Field Sports Club Compounds forCastle Semple Sailing Club
(CSSC) Clyde Windsurfing & SUP Club (CW&SUPC), St Winnoch Angling Club
(StWAC), West Coast Paddlers (WCP) and Castle Semple Rowing Club (CSRC)
30355
54526

Page 23

Supporting Information;  CSSC, StWAC WCP & CSRC Sports Compounds
Castle Semple Lochside Field Sports Club Compounds for Castle Semple Sailing Club,  St Winnoch Angling Club (StWAC), West Coast Paddlers (WCP) and
Castle Semple Rowing Club (CSRC) 
Field Levelling
We propose to level the area of the compounds with sloping banks to account for the height
drops. Where necessary, gabion baskets will be used to support the banks, after levelling the
ground will be covered with a combination of hardcore and grass
Fencing
2.4m high Vmesh security fence will be used to surround the area and for the internal dividing
boundaries.  Gates will be sited as shown on the plans 
Proposed Racking for CSRC Rowing boats 
The racking will be set into the ground in concrete. Each
individual rack stands approximately 2.2m high & 3.5m
wide and boat rack requires 2 supports, one at each
end. The racks are set at a variable distance apart
depending on the length of boat (single scull, double
scull, coxed four or coxed eight) There will be 10-14
boat racks within the compound.
Exact positioning of the racks will be dictated by the
levelling of the storage area, distance between the racks
will be approximately 3m.

Page 24

Proposed Racking for WCP Kayaks 
The racking will be set into the ground in concrete. Each individual rack stands
approximately 2.2m high & 2m wide and boat rack requires 2 supports, one at
each end. The racks are set at a variable distance apart depending on the length
of boat (single kayak or double kayak) There will be 6-8  boat racks within the
compound.
Exact positioning of the racks will be dictated by the levelling of the storage area,
distance between the racks will be approximately 2m. 
Containers
Containers of various lengths will be used for boat and other equipment storage, changing areas and administrative areas as required by clubs. These may
include areas for portable toilet units. 
The containers will sit on levelled ground with a hardcore base.

Page 25

From: DC <dc@renfrewshire.gov.uk>
Sent: 22 Jul 2022 01:13:46
To: dc.bs@renfrewshire.gov.uk
Cc: james.weir@renfrewshire.gov.uk
Subject: FW: 22/0414/PP
Attachments:
ACON-ESE-22/0414/PP
From: BS Regservices <bsregservices@renfrewshire.gov.uk>
Sent: 22 July 2022 10:53
To: DC <dc@renfrewshire.gov.uk>
Subject: 22/0414/PP
Having reviewed the above application, this Service has no comments to make on the proposals
If you require any further information on this reply please contact Colin Hunter on

Page 26

1
James Weir
From: Stephen Boyle
Sent: 04 August 2022 10:25
To: James Weir
Subject: RE: Consultation Letter for Planning Application Ref:22/0414/PP
Thanks James, 
I don’t see any issues with the extension. In a sense storing the boats here  could be seen as a benefit as it reduces
the number of times the boats would be driven to and from the Sailing club. 
I would offer no objection subject to conditions 1. the applicant shall monitor the parking provision and provide
additional parking should it be found demand exceeds provision. 
2. the field to the west of the development site offers walkers a recreational route and connects into the cycle
network. The applicant shall ensure the connection to the cycle network is not removed and shall look to improve
the connection where possible. 
Thanks
Stephen 
-----Original Message-----
From: James Weir <james.weir@renfrewshire.gov.uk>
Sent: 04 August 2022 10:03
To: Stephen Boyle <stephen.boyle@renfrewshire.gov.uk>
Subject: RE: Consultation Letter for Planning Application Ref:22/0414/PP 
Hi Stephen, 
Yeah sorry I received a response to this one whilst I was on holiday. Please see attached email accordingly. 
Let me know if this clears things up. 
Thanks again, 
________________________________
James Weir
Planner, Development Management
Renfrewshire House, Cotton Street, Paisley, PA1 1JD
Phone: 
Email: dc@renfrewshire.gov.uk
Web: Renfrewshire Council Website 
Please consider the environment before printing this email 
I am currently working from home so have no access to my phone line. Please contact me by email and I will
respond as soon as possible. 
Due to the ongoing issues related to the Coronavirus, unfortunately the Planning Authority are suspending the drop
in duty planning officer service. Please contact Planning via email – dc@renfrewshire.gov.uk 
Please note if you submitted your application via the eDevelopment portal all additional supporting documentation
in relation to your application should be submitted in the same manner as the original application.  Supporting

Page 27

2
Documentation should not be sent to the Case Officers email address or to the Council’s dc@renfrewshire.gov.uk
mailbox.  If you have any queries with this process please contact 0300 3000 144. 
-----Original Message-----
From: Stephen Boyle <stephen.boyle@renfrewshire.gov.uk>
Sent: 03 August 2022 15:28
To: James Weir <james.weir@renfrewshire.gov.uk>
Subject: FW: Consultation Letter for Planning Application Ref:22/0414/PP 
Hi James,
Trying to clear outstanding planning response. 
Did you reply to this one for me? 
I meant to also ask would the vehicles using the site change with the development, just want to make to that the
new trailers etc would not cause issues with manoeuvrability. 
Thanks
Stephen   
-----Original Message-----
From: Stephen Boyle
Sent: 06 July 2022 08:49
To: James Weir <james.weir@renfrewshire.gov.uk>
Subject: FW: Consultation Letter for Planning Application Ref:22/0414/PP 
Hi James
Can I request some further information regarding this. 
The extension looks quite large and I was looking to see if the applicant can answer the following 1. is there enough
parking to accommodate the extension? Mini bus parking needed?
2. how does the extension compare with the existing usage? 
Thanks
Stephen 
-----Original Message-----
From: dc@renfrewshire.gov.uk <dc@renfrewshire.gov.uk>
Sent: 06 July 2022 07:59
To: Stephen Boyle <stephen.boyle@renfrewshire.gov.uk>
Subject: Consultation Letter for Planning Application Ref:22/0414/PP 
Dear Stephen Boyle 
Please find attached important information from Renfrewshire Council with regards to the planning application
submitted on 13 June 2022. 
The documentation relating to the application can be reviewed online through the Council's Public Access web site,
if you have registered as a Consultee on the system you directly input your comments to the case through this web
site. 
Kind regards 
Renfrewshire Council
Renfrewshire House, Cotton Street, Paisley, PA1 1JD

Page 28

Construction Methods Statement – 23rd August 2022
Site Lochside field Castle Semple (55.79, -4.618) immediately adjacent to the
existing Clyde Muirshiel compound; Lochlip road, Lochwinnoch
Terms of Reference All contractors engaging in work on the planning proposal 22/0414/PP will
be asked ,prior to quotation, to adhere to this construction methods
statement.
Timescale It is expected that the work will occur in 2 or 3 phases; Firstly the kayak ,
angling sailing +/- windsurfing club and at a later date the rowing club
compounds would be constructed. The period of work would be around 2
weeks for each phase
Contractor Preferred contractor; Artscape ltd 23 Glenvilla Circle Paisley SC299890. 
Access Vehicle & plant access will be via the existing entry road from the lochside
path
Security During the build, plant will remain on site, all fuel & portable equipment
will be locked in a secure freightliner container. This will be >30m from the
border of the SSSI
Housekeeping There are public toilets at the Clyde Muirshiel visitor centre less than
100m from the site so there is no requirement for additional facilities
Chemical control
measures
Site supervisors will be required to ensure there are provisions in place to
minimise the possibility of fuel spillages due to the adjacency of the SSSI;
Spill kits will be available & any contaminated soil will be removed to a
landfill site. No refuelling will be conducted within 30m of the waterside
edge of the lochside field
Sediment control
measures
During any ground movement work silt traps will be placed at all possible
outfalls (including field drains) in order to prevent contamination of the
shore of Castle Semple loch. These traps will be no closer than 15m from
the shore.
Earthworks will not be conducted during or immediately following periods
of heavy rain.
Excavated materials Some ground levelling will be required to create level areas for boat racks,
Any excavated materials will be re-distributed locally in order to achieve
this. 
There is only one natural watercourse near the lochside field, a stream
close to the far north-west edge of the field, however no work is planned
in the vicinity of this stream.
Contamination All construction vehicles will be thoroughly washed prior to arrival on site
Site maintenance &
inspection
The site will be walked & inspected each day prior to commencing work
specifically to look for ground nesting birds, inspection findings will be
recorded. If any ground levelling work is anticipated from the beginning of
April until the end of August, the grass will be cut in March & maintained
short until the completion of the work.
Other provisions To our best knowledge, there is no evidence of Eurasian otter settlement
on the northwest shore of  Castle Semple loch adjacent to the lochside
path. If, between the preparation of this document & the commencement
of work there is evidence of otter activity in this area we (the lochside
field owners) will consult with NatureScot to agree any further provisions
in this construction methods statement.

Page 29

31 Miller Road, Ayr KA7 2AX
31 Rathad a’ Mhùilneir, Inbhir Àir KA7 2AX
01292 294048   nature.scot
NatureScot is the operating name of Scottish Natural Heritage 
13 July 2022 
Dear James
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997
GROUND A, LOCHLIP ROAD, LOCHWINNOCH - PLANNING CONSULTATION – 22 /0414/ PP
Thank you for consulting NatureScot on the above proposal dated 6 July 2022. We understand that the
development being considered would comprise formation of extension to watersports storage compound
with associated boundary fence, access and road.
Summary 
There are natural heritage interests of national importance adjacent to the site, which could be affected by
the proposal. The proposal is adjacent to Castle Semple and Barr Lochs Site of Special Scientific Interest
(SSSI). We require further information detailed below to determine if the proposal will affect the integrity
of the SSSI. We therefore object to the proposal until the further information is obtained from the
applicant and considered by the Planning Authority. We will comment further once the additional
information is available.
Appraisal of the impacts and Advice  
Castle Semple and Barr Lochs Site of Special Scientific Interest (SSSI)
The boundary of the proposed development is adjacent to the Castle Semple and Barr Lochs Site of Special
Scientific Interest. This site is designated for it Eutrophic Loch freshwater habitat and Breeding Bird
Assemblage notified features. Further information can be found on NatureScot’s Site Link website:
https://sitelink.nature.scot/site/346
The Supporting Statement proposes that there will be activity to “level the area of the compounds with
sloping banks to account for the height drops. Where necessary, gabion baskets will be used to
support the banks, after levelling the ground will be covered with a combination of hardcore and
grass”. Construction work of this nature may result in direct and indirect impacts on the SSSI through run-
off of material into the loch during construction. There is also the potential for disturbance to breeding
birds, if works take place during the breeding bird season (March-August). 
James Weir
Planning Officer
Renfrewshire Council 
By email:  dc@renfrewshire.gov.uk

Page 30

2 
Cadzow Court, 3 Wellhall Road, Hamilton ML3 9BG
Cùirt Cadzow, 3 Rathad Wellhall, Hamilton ML3 9BG
01738 457037   nature.scot
NatureScot is the operating name of Scottish Natural Heritage 
As no information has been provided regarding the nature and timing of works proposed, it is not possible
to assess effects on the objectives of designation and the overall integrity of the area without further
information.
There are natural heritage interests of national importance on the site, which could be affected by the
proposal. We require further information to determine if the proposal will affect the integrity of the SSSI.
We therefore object to the proposal until the further information detailed below is obtained from the
applicant and considered by the Planning Authority. We will comment further once the additional
information is available.
- Detailed information on works to be carried out, the period during which these works will take
place and the likely duration of the works (in order for us to assess the possible impacts upon the
breeding bird assemblage)
- Surface Water Management Plan 
If the planning authority intends to grant planning permission against this advice without the requested
information, you must notify Scottish Ministers.
Protected Species
We also advise that there is a known population of Eurasian Otter resident within the area, and that the
applicant should consider whether a species protection plan is likely to be required. Our standing advice on
otter is available here: https://www.nature.scot/professional-advice/planning-and-development/planning-
and-development-advice/planning-and-development-protected-species 
Concluding remarks
The advice in this letter is provided by NatureScot, the operating name of Scottish Natural Heritage. We
hope that you will find it helpful in your consideration of these proposals.  However, should you require any
further information or advice, please contact Siân Williams at sian.williams@nature.scot. 
Yours sincerely,
Lyndsey Kinnes (by email) 
Operations Manager
West Central Scotland

Page 31

Cadzow Court, 3 Wellhall Road, Hamilton ML3 9BG
Cùirt Cadzow, 3 Rathad Wellhall, Hamilton ML3 9BG
01738 457037   nature.scot
NatureScot is the operating name of Scottish Natural Heritage 
30 August 2022 
Dear James 
TOWN AND COUNTRY PLANNING (SCOTLAND) ACT 1997
GROUND A, LOCHLIP ROAD, LOCHWINNOCH - PLANNING CONSULTATION – 22 /0414/ PP
Thank you for your email of 23 August 2022 providing us with the applicant’s Construction Method
Statement (CMS), relating to the formation of extension to watersports storage compound with
associated boundary fence, access and road. We previously issued a holding objection dated 13
July 2022, because we needed further information at that time to determine the potential impacts
of the application on Castle Semple and Barr Lochs SSSI. 
Summary
This proposal could be progressed with appropriate mitigation measures. However, the proposal
could adversely affect natural heritage interests of national importance, and we therefore object
to it unless it is made subject to the measures set out below:
 That all works are undertaken in accordance with agreed the Construction Method
Statement.
If the planning authority is minded to grant planning permission without the condition
recommended above the case must be notified to Scottish Ministers.
We advise that a species protection plan should be prepared, which covers otters and breeding
birds. This plan should be completed in advance of any works commencing on site, and should
include actions that will be taken should otters or breeding birds be found on-site.
It is for the planning authority to determine, within the context of its own policies, whether
conditions are necessary to secure the mitigation set out above for otters and breeding birds. 
James Weir, Planner
Development Management 
Renfrewshire House
Cotton Street
Paisley
PA1 1JD
By email: james.weir@renfrewshire.gov.uk

Page 32

2 
Cadzow Court, 3 Wellhall Road, Hamilton ML3 9BG
Cùirt Cadzow, 3 Rathad Wellhall, Hamilton ML3 9BG
01738 457037   nature.scot
NatureScot is the operating name of Scottish Natural Heritage 
Appraisal of the impacts of the proposal and advice 
Castle Semple and Barr Lochs Site of Special Scientific Interest (SSSI)
The boundary of the proposed development is adjacent to the Castle Semple and Barr Lochs Site
of Special Scientific Interest. This site is designated for it Eutrophic Loch freshwater and Breeding
Bird Assemblage features.  Further information can be found on NatureScot’s Site Link website:
https://sitelink.nature.scot/site/346
With regards to the Eutrophic Loch notified feature, we advise that if the measures set out in the
CMS are followed then the feature should not be adversely affected. We advise that the proposal
will not compromise the objectives of designation and the overall integrity of the area provided
that all works are undertaken in accordance with the CMS.
Breeding Birds have been noted on site as early as March, and without survey work it is not
possible to be certain that otter are not present. Guidance on otters can accessed here:
https://www.nature.scot/professional-advice/planning-and-development/planning-and-
development-advice/planning-and-development-protected-species.
We advise that a species protection plan should be prepared, which covers otters and breeding
birds. Guidance on the content of a Species Protection Plan can be found on our website:
https://www.nature.scot/professional-advice/planning-and-development/planning-and-
development-advice/planning-and-development-protected-species.
Conclusion
This advice is provided by NatureScot, the operating name of Scottish Natural Heritage. 
We hope that you will find it helpful in your consideration of these proposals. However, should
you require any further information or advice, please contact Siân Williams at
sian.williams@nature.scot 
Yours sincerely,
Lyndsey Kinnes (by email) 
Operations Manager
West Central Scotland

Page 33

No embedded text on this page.

Page 34

No embedded text on this page.

Page 35

No embedded text on this page.

Page 36

No embedded text on this page.

Page 37

No embedded text on this page.

Page 38

No embedded text on this page.

Page 39

No embedded text on this page.

Page 40

No embedded text on this page.

Page 41

No embedded text on this page.

Page 42

No embedded text on this page.

Page 43

No embedded text on this page.

Page 44

Page 1 of 8
Renfrewshire House Cotton Street Paisley PA1 1JD  Tel: 0300 3000 144  Fax: 0141 618 7935  Email: dc@renfrewshire.gov.uk
Applications cannot be validated until all the necessary documentation has been submitted and the required fee has been paid.
Thank you for completing this application form:
ONLINE REFERENCE 100557175-001
The online reference is the unique reference for your online form only. The  Planning Authority will allocate an Application Number when
your form is validated. Please quote this reference if you need to contact the planning Authority about this application.
Type of Application
What is this application for? Please select one of the following: *
  Application for planning permission (including changes of use and surface  mineral working).
  Application for planning permission in principle.
  Further application, (including renewal of planning permission, modification, variation or removal of a planning condition etc)
  Application for Approval of Matters specified in conditions.
Description of Proposal
Please describe the proposal including any change of use: *  (Max 500 characters)
Is this a temporary permission? *  Yes   No
If a change of use is to be included in the proposal has it already taken place?  Yes   No
(Answer ‘No’ if there is no change of use.) *
Has the work already been started and/or completed? *
 No   Yes – Started   Yes - Completed
Applicant or Agent Details
Are you an applicant or an agent? * (An agent is an architect, consultant or someone else acting
on behalf of the applicant in connection with this application)  Applicant  Agent
Creation of new West Coast Paddlers (WCP) kayak club compound,  expansion of the proposed StWAC compound by 1.6m in
width and relocation of the footprint of the future CSRC compound 21.2m down the field in a north-easterly direction. Access road
shown  in plans =  230m long, 3m wide road with 1m drainage ditch on NW side. Compared to previously approved plans
19/0431/PP the road is longer & also closer to the SE border of the field.

Page 45

Page 2 of 8
Applicant Details
Please enter Applicant details
Title: You must enter a Building Name or Number, or both: *
Other Title: Building Name:
First Name: * Building Number:
Address 1
Last Name: * (Street): *
Company/Organisation Address 2:
Telephone Number: * Town/City: *
Extension Number: Country: *
Mobile Number: Postcode: *
Fax Number:
Email Address: *
Site Address Details
Planning Authority:
Full postal address of the site (including postcode where available):
Address 1: 
Address 2:
Address 3:
Address 4:
Address 5:
Town/City/Settlement:
Post Code:
Please identify/describe the location of the site or sites
Northing Easting
Mr
Graham
Renfrewshire Council
Bell Victoria Gardens
5
PA13 4HL
South-west border of proposed application = North-east border of existing windsurfing sports compound in the lochside field
adjacent to Castle Semple Loch
United Kingdom
659208
Kilmacom
235993

Page 46

Page 3 of 8
Pre-Application Discussion
Have you discussed your proposal with the planning authority? *  Yes   No
Site Area
Please state the site area:
Please state the measurement type used:  Hectares (ha)   Square Metres (sq.m)
Existing Use
Please describe the current or most recent use: *  (Max 500 characters)
Access and Parking
Are you proposing a new altered vehicle access to or from a public road? *  Yes   No
If Yes please describe and show on your drawings the position of any existing. Altered or new access points, highlighting the changes
you propose to make. You should also show existing footpaths and note if there will be any impact on these.
Are you proposing any change to public paths, public rights of way or affecting any public right of access? *  Yes   No
If Yes please show on your drawings the position of any affected areas highlighting the changes you propose to make, including
arrangements for continuing or alternative public access.
Water Supply and Drainage Arrangements
Will your proposal require new or altered water supply or drainage arrangements? *  Yes   No
Do your proposals make provision for sustainable drainage of surface water?? *  Yes   No
(e.g. SUDS arrangements) *
Note:-
Please include details of SUDS arrangements on your plans
Selecting ‘No’ to the above question means that you could be in breach of Environmental legislation.
Are you proposing to connect to the public water supply network? *
  Yes
  No, using a private water supply
  No connection required
If No, using a private water supply, please show on plans the supply and all works needed to provide it (on or off site).
3095.00
Agricultural land used for cattle grazing until purchase by several watersports clubs in 2012, the lochside field currently houses 2
water-sports club compounds and has a large remaining area currently used by dog walkers / joggers. The proposal will occupy
3095m2 of the field which is has a total area of 23954m2

Page 47

Page 4 of 8
Assessment of Flood Risk
Is the site within an area of known risk of flooding? *  Yes    No   Don’t Know
If the site is within an area of known risk of flooding you may need to submit a Flood Risk Assessment before your application can be
determined. You may wish to contact your Planning Authority or SEPA for advice on what information may be required.
Do you think your proposal may increase the flood risk elsewhere? *  Yes    No   Don’t Know
Trees
Are there any trees on or adjacent to the application site? *  Yes   No
If Yes, please mark on your drawings any trees, known protected trees and their canopy spread close to the proposal site and indicate if
any are to be cut back or felled.
All Types of Non Housing Development – Proposed New Floorspace
Does your proposal alter or create non-residential floorspace? *  Yes   No
Schedule 3 Development
Does the proposal involve a form of development listed in Schedule 3 of the Town and Country  Yes   No   Don’t Know
Planning (Development Management Procedure (Scotland) Regulations 2013 *
If yes, your proposal will additionally have to be advertised in a newspaper circulating in the area of the development. Your planning
authority will do this on your behalf but will charge you a fee. Please check the planning authority’s website for advice on the additional
fee and add this to your planning fee.
If you are unsure whether your proposal involves a form of development listed in Schedule 3, please check the Help Text and Guidance
notes before contacting your planning authority.
Planning Service Employee/Elected Member Interest
Is the applicant, or the applicant’s spouse/partner, either a member of staff within the planning service or an  Yes    No
elected member of the planning authority? *
Certificates and Notices
CERTIFICATE AND NOTICE UNDER REGULATION 15 – TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT
PROCEDURE) (SCOTLAND) REGULATION 2013
One Certificate must be completed and submitted along with the application form. This is most usually Certificate A, Form 1,
Certificate B, Certificate C or Certificate E.
Are you/the applicant the sole owner of ALL the land? *  Yes    No
Is any of the land part of an agricultural holding? *  Yes    No
Are you able to identify and give appropriate notice to ALL the other owners? *   Yes    No
Certificate Required
The following Land Ownership Certificate is required to complete this section of the proposal:
Certificate B

Page 48

Page 5 of 8
Land Ownership Certificate
Certificate and Notice under Regulation 15 of the Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013
I hereby certify that
(1) - No person other than myself/the applicant was an owner [Note 4] of any part of the land to which the application relates at the
beginning of the period of 21 days ending with the date of the accompanying application;
or –
(1) - I have/The Applicant has served notice on every person other than myself/the applicant who, at the beginning of the period of 21
days ending with the date of the accompanying application was owner [Note 4] of any part of the land to which the application relates.
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Mr Tom  Sprought
Mr Alan Murray
Mr Peter Collings
Mr Rob  McIver
Ms Eleanor  Inglis
Saint Winnoch Angling Club, 2, Calderpark Avenue, Lochwinnoch, PA12 4AY
Saint Winnoch Angling Club, 3, Calderhaugh Mill, Lochwinnoch, PA12 4AJ
Castle Semple Sailing Club, 57, Grovepark Street, Glasgow, G207NZ
Castle Semple Sailing ClubC/O, 57, Grovepark Street, Glasgow, G20 7NZ
Castle Semple Rowing ClubC/O, Clyde Muirshiel Regional Park, Lochlip Rd, Lochwinnoch, PA12 4AE
23/05/2022
23/05/2022
23/05/2022
23/05/2022

Page 49

Page 6 of 8
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
Name:
Address:
Date of Service of Notice: *
(2) - None of the land to which the application relates constitutes or forms part of an agricultural holding;
or –
(2) - The land or part of the land to which the application relates constitutes or forms part of an agricultural holding and I have/the
applicant has served notice on every person other than myself/himself who, at the beginning of the period of 21 days ending with the
date of the accompanying application was an agricultural tenant.  These persons are:
Name:
Address:
Date of Service of Notice: *
Mr Tony Synott
Mr Andy Galloway
Mr Martin  Kerr
Castle Semple Rowing Club, 119, Renfrew Road, Paisley, PA3 4EA
Clyde Windsurfing & SUP Clubc/o, Clyde Muirshiel Regional Park, Lochlip Rd, Lochwinnoch, PA12 4AE
Clyde Windsurfing & SUP Clubc/o, Clyde Muirshiel Regional Park, Lochlip Rd, Lochwinnoch, PA12 4AE
23/05/2022
23/05/2022
23/05/2022
23/05/2022

Page 50

Page 7 of 8
Signed: Mr Graham Bell
On behalf of:
Date: 13/06/2022
 Please tick here to certify this Certificate. *
Checklist – Application for Planning Permission
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Please take a few moments to complete the following checklist in order to ensure that you have provided all the necessary information
in support of your application. Failure to submit sufficient information with your application may result in your application being deemed
invalid. The planning authority will not start processing your application until it is valid.
a) If this is a further application where there is a variation of conditions attached to a previous consent, have you provided a statement to
that effect? *
 Yes   No   Not applicable to this application
b) If this is an application for planning permission or planning permission in principal where there is a crown interest in the land, have
you provided a statement to that effect? *
 Yes   No   Not applicable to this application
c) If this is an application for planning permission, planning permission in principle or a further application and the application is for
development belonging to the categories of national or major development (other than one under Section 42 of the planning Act), have
you provided a Pre-Application Consultation Report? *
 Yes   No   Not applicable to this application
Town and Country Planning (Scotland) Act 1997
The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
d) If this is an application for planning permission and the application relates to development belonging to the categories of national or
major developments and you do not benefit from exemption under Regulation 13 of The Town and Country Planning (Development
Management Procedure) (Scotland) Regulations 2013, have you provided a Design and Access Statement? *
 Yes   No   Not applicable to this application
e) If this is an application for planning permission and relates to development belonging to the category of local developments (subject
to regulation 13. (2) and (3) of the Development Management Procedure (Scotland) Regulations 2013) have you provided a Design
Statement? *
 Yes   No   Not applicable to this application
f) If your application relates to installation of an antenna to be employed in an electronic communication network, have you provided an
ICNIRP Declaration? *
 Yes   No   Not applicable to this application
g) If this is an application for planning permission, planning permission in principle, an application for approval of matters specified in
conditions or an application for mineral development, have you provided any other plans or drawings as necessary:
  Site Layout Plan or Block plan.
  Elevations.
  Floor plans.
  Cross sections.
  Roof plan.
  Master Plan/Framework Plan.
  Landscape plan.
  Photographs and/or photomontages.
  Other.

Page 51

Page 8 of 8
If Other, please specify: *  (Max 500 characters)
Provide copies of the following documents if applicable:
A copy of an Environmental Statement. *  Yes   N/A
A Design Statement or Design and Access Statement. *  Yes   N/A
A Flood Risk Assessment. *  Yes   N/A
A Drainage Impact Assessment (including proposals for Sustainable Drainage Systems). *  Yes   N/A
Drainage/SUDS layout. *  Yes   N/A
A Transport Assessment or Travel Plan  Yes   N/A
Contaminated Land Assessment. *  Yes   N/A
Habitat Survey. *  Yes   N/A
A Processing Agreement. *  Yes   N/A
Other Statements (please specify). (Max 500 characters)
Declare – For Application to Planning Authority
I, the applicant/agent certify that this is an application to the planning authority as described in this form. The accompanying
Plans/drawings and additional information are provided as a part of this application.
Declaration Name: Mr Graham Bell
Declaration Date: 13/06/2022
Payment Details
Online payment: 094681
Payment date: 13/06/2022 09:43:15
Created: 13/06/2022 09:43