Renfrewshire
Local Development Plan
New Development
Supplementary Guidance
2022

Page 2

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  2

Page 3

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   3
Contents
Introduction……………………………………………………........................................................ 4
How to use the Plan………………………………………........................................................ 4
Delivering the Economy Strategy………………………................................................ 5
Delivering the Centres Strategy …………………………............................................... 12
Delivering the Infrastructure Strategy …………………............................................. 16
Delivering the Places Strategy .…………………………….............................................  21
Delivering the Environment Strategy.........................................……….................. 31
Appendix 1
Additional Information for Assessment - Technical Assessments .......…....... 43
RENFREWSHIRE NEW DEVELOPMENT SUPPLEMENTARY GUIDANCE

Page 4

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  4
Introduction
The Renfrewshire Local Development Plan
is supported by the New Development
Supplementary Guidance.
The Renfrewshire Local Development Plan
sets a framework for the enhancement of
Renfrewshire’s diverse natural environment,
built and cultural heritage assets, the
delivery of new economic and infrastructure
investment and guides the future use of land
to create great and sustainable places across
Renfrewshire. 
The detailed development criteria for the
assessment of development proposals is
contained within this New Development
Supplementary Guidance and is structured
around the themes of the Local Development
Plan:
• Economy
• Centres
• Infrastructure
• Places
• Environment
Renfrewshire Local
Development Plan
Thematic Policies:
•            Economy
•            Centres
•            Infrastructure
•            Places
•            Environment
RENFREWSHIRE NEW DEVELOPMENT SUPPLEMENTARY GUIDANCE
How to use the Plan
All developments must be assessed against the Renfrewshire Local Development Plan and the
guidance and criteria in the New Development Supplementary Guidance. 
The New Development Supplementary Guidance provides additional detailed information in
relation to designing, delivering and implementing development, with an emphasis on place making
and sustainable, inclusive development.
Both provide an integrated development framework providing a consistent approach to the
assessment of planning applications.  
Renfrewshire New
Development
Supplementary
Guidance
Thematic Policies:
•            Economy
•            Centres
•            Infrastructure
•            Places
•            Environment
Assessment of
Development

Page 5

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   5
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Economic Investment Locations
Renfrewshire’s Economic Investment Locations consist of Strategic Economic Investment Locations
(SEILs) and Local Industrial Areas.
Development proposals in these economic locations requires to meet the following criteria:
Support the role and function of the
economic investment locations as
identified in Figure 1 and be compatible
with the surrounding character of the
area;
Support sustainable and inclusive
economic growth as well as allowing
diversification or transition into new
economic sectors or clusters in response
to changing markets and / or demand;
Employment generating uses not listed in
Classes 4 (Business), 5 (General Industry)
and 6 (Storage & Distribution) of the Use
Classes Order will be supported in these
locations subject to the consideration of
Clydeplan Strategic Development Plan
(2017) for development within SEILs and
Local Development Plan Policies E1 and
E2;
Development must not impact upon
the existing uses or potential economic
investment within the area;
Proposals for waste management
infrastructure will be acceptable where
it conforms to, meets and delivers the
objectives of the Zero Waste Plan as well
as demonstrating that it will not have a
significant adverse impact upon amenity
or operation of other uses, subject to site
specific considerations; and,
All proposals will be considered in
relation to the Delivering the Spatial
Strategy – Economy section of the Local
Development Plan.

Page 6

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  6
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Renfrewshire’s Economic
Investment Locations
Role and Function Challenges/Opportunities
Strategic Economic Investment Locations (SEIL)
Advanced Manufacturing
and Innovation District
Scotland (AMIDS)
Distribution and Logistics/
Manufacturing/ Engineering/ Green
Technologies/ Life Sciences/
Research and Development/ Airport
related uses.
Consists of Inchinnan Business Park, Westway and Netherton Farm area clustered
around Glasgow Airport.
City Deal Investment to improve access to Glasgow Airport and connectivity within
the Strategic Economic Investment Locations facilitating the development of key
development sites. Key location to support innovation in manufacturing across
Scotland.
This location also includes a Strategic Freight Hub which supports the operation of
Glasgow Airport and the Strategic Economic Investment Locations.
Hillington/ Renfrew North Distribution and Logistics,
Manufacturing/ Engineering,
Business Services.
A Simplified Planning Zone is in place supporting sustainable and inclusive economic
growth at Hillington Business Park. Opportunity to diversify uses to adapt to changing
market demands and facilitate the redevelopment of key sites.
This location also includes a Strategic Freight Hub which supports the operation of the
Strategic Economic Investment Locations.
Opportunity to consider more sustainable modes of transport and the decarbonisation
of freight.
Figure 1 – Renfrewshire’s Economic Investment Locations
Renfrewshire’s Economic Investment Locations

Page 7

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   7
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Renfrewshire’s Economic
Investment Locations
Role and Function Challenges/Opportunities
Local Industrial Areas
Burnbrae, Linwood Locally important industrial area.
Strategic Freight Transport Hub with
road/rail transfer facility.
Good accessibility to freight hub, M8 and Glasgow Airport offers significant potential
for new economic investment at this location.
Intermodal terminal providing sustainable road/rail freight transfers, with opportunities
to remove goods vehicles from the road network.
Land to north east of
Phoenix Commercial
Centre, Linwood
Major regeneration opportunity. Key strategic location to the west of Paisley and the airport, along the M8/A737
trunk road. The site provides business and industrial space within a wider mixed-use
development.
Murray Street, Paisley Locally important local industrial
area.
Location includes a range of businesses and available properties/development sites. 
Proximity to the M8 and Glasgow Airport offers significant potential for new economic
investment.
Area to north of Paisley
Town Centre
Renfrewshire’s administrative,
education, civic, local business and
financial centre.
Significant regeneration potential for the area to the north of the town centre.
Opportunity to enhance access to Glasgow Airport and the Advanced Manufacturing
and Innovation District Scotland through sustainable modes of travel and transport.
Figure 1 – Renfrewshire’s Economic Investment Locations - Continued
Renfrewshire’s Economic Investment Locations

Page 8

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  8
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Transition Areas
New development or redevelopment of sites which are described as
Transition Areas may be suitable to incorporate various uses.
Figure 2 identifies areas that are in transition and details potential uses
for each of these areas. Development proposals requires to meet the
following criteria:
Demonstrate that the type of use, mix, scale and location of
development is appropriate for the site and wider surrounding
area, reflecting the landscape character of the area;
Demonstrate that there will be no significant effect on the
amenity of the surrounding area and the proposal does not have
an adverse effect on the integrity of any European sites;
Consideration requires to be given to comprehensive development
with the use of a masterplan or design brief/framework approach;
All proposals will be considered in relation to the relevant
development criteria, including the Places, Infrastructure and
Environment Development Criteria; and,
Proposals for waste management infrastructure will be acceptable
within Transition Areas where it conforms to, meets and delivers
the objectives of the Zero Waste Plan as well as demonstrating
that it will not have a significant impact upon amenity or operation
of other uses, subject to site specific considerations.
Business and Industrial Development out
with Renfrewshire’s Economic Investment
Locations
Proposals for new business and industrial development out with
Renfrewshire’s Economic Investment Locations will be considered
in relation to the Economic Development Criteria and the relevant
Renfrewshire Local Development Plan Policies and associated
Supplementary Guidance.
Where appropriate proposals for home-working, micro businesses
and community hubs will be supported subject to consideration
against the relevant Local Development Plan Policies and Development
Guidance and where there is no significant detrimental impact on
amenity.

Page 9

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   9
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Location of Transition Area Acceptable uses within Transition Area
Erskine Riverfront Business and industrial uses within Classes 4, 5 and 6 of the Use Class Order, residential, hotels, residential
institutions, educational facilities, nurseries, leisure, restaurants and other commercial uses of a scale
appropriate in relation to the Network of Centres. Includes important riverfront recreational asset and access
to the riverfront requires to be retained.
Candren Area, Paisley Business and industrial uses within Classes 4, 5 and 6 of the Use Class Order, hotels, leisure uses, educational
facilities and other commercial uses of a scale appropriate in relation to the Network of Centres.
North Johnstone Business and industrial uses within Classes 4, 5 and 6 of the Use Class Order, hotels, residential, residential
institutions, educational facilities, nurseries and other commercial uses of a scale appropriate in relation to the
Network of Centres.
Paisley East End Residential, offices, storage facilities, educational facilities, nurseries, residential institutions and other
commercial uses of a scale appropriate in relation to the Network of Centres.
Middleton Road, Linwood Residential, residential institutions, educational facilities, nurseries, business and light industrial and other
commercial uses of a scale appropriate in relation to the Network of Centres.
Meadowside Street/ Blythswood Area,
Renfrew
Residential, residential institutions, educational facilities, leisure, nurseries, business, and waste management
and other commercial uses of a scale appropriate in relation to the Network of Centres.
Area to north of Paisley Town Centre Business and industrial uses within Classes 4, 5 and 6 of the Use Class Order, hotels, residential, residential
institutions, educational facilities, nurseries and leisure and other commercial uses of a scale appropriate in
relation to the Network of Centres. Opportunity to enhance access to Glasgow Airport and the Advanced
Manufacturing and Innovation District Scotland.
Underwood Road, Paisley Business and industrial uses within Classes 4, 5 and 6 of the Use Class Order, residential, residential institutions,
educational facilities, nurseries, leisure and other commercial uses of a scale appropriate in relation to the
Network of Centres.
Figure 2 – Transition Areas
Transition Areas

Page 10

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  10
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Glasgow Airport
Glasgow International Airport is a key component of the
economy at the national, regional and local level. The Airport is an
international gateway with important linkages to wider business
and tourism markets.
Existing operational land for the airport, as shown on the Proposals
Maps, requires to be safeguarded allowing the airport to operate
to its full potential.
Development proposals within the Glasgow Airport Public Safety
Zone require to be considered in accordance with the stated
Government policy contained in the Scottish Government Circular
8/2002 and any future policy updates.
Within the airport operational land there will be support for uses
associated with operational function of the airport or uses which
are compatible and do not compromise the airport operation or
functionality, including:
The movement and maintenance of aircraft;
The embarking, loading, discharging or transporting of
passengers, livestock or goods; and,
Development in Classes 4 (business), 6 (storage and
distribution) and 7 (hostels and hotels), car parking and
car rental facilities, where it can be demonstrated that the
development is associated with the functioning of the airport.

Page 11

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   11
DELIVERING THE ECONOMIC STRATEGY - DEVELOPMENT GUIDANCE
Tourism
Tourism is an important element of the
economic, social, environmental and
cultural well-being of Renfrewshire’s places
and environment and is a key driver of the
economy. Proposals for new tourist facilities
and attractions will be considered in relation to
the aims of Renfrewshire’s Tourism Framework
and Visitor Plan.
Improvements and enhancements to existing
or the creation of new tourist facilities and
attractions will be supported subject to
meeting the criteria in Policy E4 Tourism of the
Local Development Plan.
New development proposals require to:
Add to the appeal and attraction of
Renfrewshire as a visitor destination and
contribute to the local economy providing
new employment opportunities with a
social and/or cultural benefit to the area;
Complement existing/proposed tourist
facilities in the area;
Not result in significant detrimental impacts
on visual amenity, the built heritage or
natural heritage interests;
Be of a design, quality and density which is
appropriate for the location and surrounding area
and would be compatible with neighbouring land
uses;
Consider opportunities to encourage participation
and enjoyment of Renfrewshire’s natural heritage
assets, ensuring that there are no significant
adverse effects on the natural environment
including biodiversity and landscape character;
Demonstrate that suitable infrastructure and
services are available or can be provided to serve
the development proposal;
Demonstrate that the site is accessible by a choice
of transport options and access within and out with
the development connects to active travel routes
and/or the wider green network;
Demonstrate that the road and/or rail network can
accommodate the development;
Demonstrate a site-specific locational need and/or
address a deficit in the provision of tourist facilities
in the area; and,
Incorporate a design which promotes energy
efficiency and the use of low carbon generating
technologies.

Page 12

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  12
DELIVERING THE CENTRES STRATEGY - DEVELOPMENT GUIDANCE
Strategic Centres and Core Town Centres
Development proposals require to support the diverse role and
function of Renfrewshire’s Strategic Centres and Core Town
Centres reflecting a sustainable mix of activities and uses.
Development which will enhance the vitality and viability of centres
and strengthen their key role within Renfrewshire’s Network of
Centres will be welcomed.
All proposals will be considered against Renfrewshire Local
Development Plan, including Policy C1 Renfrewshire’s Network of
Centres.
Local Service Centres and Village Centres
Proposals within Local Service Centres and Village Centres will be
supported where they demonstrate that they will meet local need
and will not significantly impact on the viability or vitality of the
existing centre or any other network centre.
The scale of development proposal requires to reflect the size of
community that the centre serves. Support will be given to proposals
which enhance and regenerate these centres.
All proposals will be considered against Renfrewshire Local
Development Plan, including Policy C1 Renfrewshire’s Network of
Centres.
Sustain the role and function of the centre as identified in Figure 3;
and,
Demonstrate that there would be no significant adverse impact
upon the role and function of any other network centre.
Meeting Local Neighbourhood Demand
Retail and commercial development out with the defined Network of
Centres will be considered acceptable in principle where the proposal
meets a local neighbourhood demand and subject to meeting the
criteria within Policy C2 Development Out with Renfrewshire’s Network
of Centres and the relevant policies identified on the Proposals Maps.
For the purposes of assessing local supply and demand, the catchment
will be defined by the area from which the site is easily accessible on
foot.
These centres provide a location for retail development that typically
cannot be located within the other centres in the network. There may
also be opportunities for some ancillary and/or enabling commercial
development to complement the existing uses.
Proposals within Renfrewshire’s Local Commercial Centres will be
supported where they:
Local Commercial Centres

Page 13

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   13
DELIVERING THE CENTRES STRATEGY - DEVELOPMENT GUIDANCE
Centre Role and Function
Strategic Centres
Paisley Town Centre Renfrewshire’s main cultural, heritage and civic centre. Offers a diverse mix of uses and attributes providing a hub
for public transport, business, retail, leisure, education, community uses and residential uses. A spatial development
framework for the town centre is presented in the Renfrewshire Local Development Plan.
Braehead Renfrewshire’s largest retail and leisure centre with strong supporting commercial and business uses. A spatial
development framework for the centre is presented in the Renfrewshire Local Development Plan.
Core Town Centres
Johnstone Town Centre The largest and most diverse centre within West Renfrewshire with a strong, historic character and a rich heritage. A
civic, cultural and local retail centre which provides key services for both the local population and settlements across
West Renfrewshire.
Renfrew Town Centre The largest centre within North Renfrewshire with a distinctive character and a number of historic listed buildings reflecting
the identity of the town. The centre has strong civic, cultural and local retail functions which provide key services for the
local population and neighbouring settlements. A Simplified Planning Zone is in place to support diversification of uses.
Erskine Town Centre Local retail, leisure and commercial centre which provides key services for the local community and settlements such
as Inchinnan and Bishopton.  
Linwood Town Centre Linwood is a local retail and commercial centre which plays an important role in providing key services for the local
community and supporting the choice of provision across West Renfrewshire.  
A Centre Strategy and Action Plan has been prepared for each Strategic Centre and Core Town Centre to guide investment in the Centre. The Local
Development Plan Action/Delivery Programme includes an action to review these strategies every two years.
Renfrewshire’s Network of Centres - Role and Function
Figure 3 – Renfrewshire’s Network of Centres - Role and Function

Page 14

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  14
DELIVERING THE CENTRES STRATEGY - DEVELOPMENT GUIDANCE
Centre Role and Function
Local Service Centres
Bridge of Weir Local convenience retail, commercial
and community village centre.
Bishopton Local convenience retail, commercial
and community village centre.
Bishopton
(Dargavel Village)
Local convenience retail, commercial
and community village centre
supporting delivery of the Community
Growth Area.
Lochwinnoch Local convenience retail, commercial
and community village centre.
Paisley West End Local retail and commercial service
centre.
Paisley East End Local retail and commercial service
centre.
Neilston Road Local retail and commercial service
centre.
Renfrewshire’s Network of Centres - Role and Function
Centre Role and Function
Commercial Centres
Phoenix, Linwood Out of town retail and commercial centre
accommodating a range of commercial,
food and drink and retail uses.
Abbotsinch, Paisley Out of town retail centre accommodating
a range of retail uses.
Braehead Retail Park Retail and commercial location providing
a range of commercial and retail uses in
support of Braehead Strategic Centre.
Blythswood, Renfrew Transition Area able to support a range of
uses and facilities of a scale appropriate
in relation to the Network of Centres.
Figure 3 – Renfrewshire’s Network of Centres - Role and Function -Continued

Page 15

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   15
DELIVERING THE CENTRES STRATEGY - DEVELOPMENT GUIDANCE
Hot Food; Public Houses; Licensed Venues and
Amusement Arcades
Pedestrian safety, traffic and parking must not be prejudiced with
suitable access provided;
There must be no significant impact on the residential amenity, in
terms of hours of operation, noise, disturbance, cooking odours,
fumes or vapours;
Suitable and well-designed provision for the collection and storage
of waste must be conveniently sited for both the premises (or other
user) and the waste collection authority;
The applicant must demonstrate full control to install a flue
extraction system to ventilate and disperse cooking odours;
The design of the flue must be visually acceptable and will generally
be required to extend a minimum of 1.0 metre above the eaves level
of the adjoining property; and,
Where required, suitable parking and servicing arrangements must
be provided to serve the proposed use.
Proposals for Class 3 uses, hot food takeaways, public houses and bars,
licensed clubs, amusement arcades and entertainment venues such as
night clubs, will be directed to Strategic Centres, Core Town Centres
and Local Service Centres as defined within the Renfrewshire Local
Development Plan Proposals Maps.
All proposals will be considered against the following criteria:

Page 16

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  16
DELIVERING THE INFRASTRUCTURE  STRATEGY - DEVELOPMENT GUIDANCE
Connecting Places
All proposals will be considered in line with Policy I1 Connecting Places of the Local Development
Plan and the following criteria:
Development proposals require to
be sited at locations which ensure
appropriate provision to public
transport and where possible
link to public transport hubs and
interchanges;
The provision of safe and convenient
pedestrian and cycle access to and
within the development which can
be used by all potential users, with
links to existing and proposed active
travel routes in and around places,
integrating with the wider active travel
network;
Where required, ensure the
implementation of safe pedestrian
routes to public transport, schools,
local services and open space from
the proposed site;
Public transport networks should be
accessible within 400 metres walking
distance of the development;
Where practical make provision within
development layouts giving priority to
and allowing penetration by buses;
When development is in close proximity to rail
stations/halts, where required ensure that provision is
made for good direct, safe access to and from these
facilities;
Connections to and from development are required
to be in line with the ‘Getting It Right for Every Child’
approach;
The design, layout and standard of any proposed
active travel or transport infrastructure is appropriate
to the local environment and the character of the
surrounding area to achieve safe movement of
pedestrians, cyclists and traffic whilst ensuring a
pleasant and safe environment;
Development proposals should consider the need
to supply safe and convenient cycle parking, and
where appropriate motorcycles, visitor parking and
disabled parking with consideration given to the type,
mix and use of development, car ownership levels,
the surrounding uses and the accessibility of the
development by sustainable modes when considering
parking provision for other vehicles;
Aim to ensure where there is knowledge of or
potential for future neighbouring development that
the development layout provides for future active
travel and vehicular connections between places;
Development should demonstrate the
provision of electric, hydrogen, and other low
or zero-emission vehicle and cycle charging
points as an integral part of new development
or redevelopment proposals;
The full transport impact of new development
including the potential impact on the
performance and safety of the trunk road
and/or rail network requires to be assessed.
Suitable measures to mitigate any impact
arising from development requires to be
identified and delivered by the developer;
The individual and cumulative impact from
the traffic generated by the development
does not significantly affect air quality;
Proposals for development, which the Council
considers will generate significant travel
demand, are required to be accompanied by
a travel plan demonstrating how travel to and
from the site by means other than private car
will be achieved and encouraged; and,
Masterplans, development briefs and
proposals for major developments require
to include satisfactory mechanisms or
provisions for supporting sustainable
transport objectives along with additional
infrastructure, facilities and services required
to support the development.

Page 17

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   17
DELIVERING THE INFRASTRUCTURE  STRATEGY - DEVELOPMENT GUIDANCE
Flooding and Drainage
All proposals will be considered in line with Policy I3 Flooding and
Drainage of the Local Development Plan and the following criteria:
Development proposals require to adopt a
precautionary approach to the reduction
of flood risk from all sources and comply
with the principles of sustainable flood risk
management and strengthen resilience to
the current and future impacts of climate
change in line with Scottish Government
policy;
New development requires to avoid areas
susceptible to flooding;
Development must not increase the risk of
flooding elsewhere;
Development must not have an adverse
impact on existing drainage infrastructure,
and it must be demonstrated that
the site can be satisfactorily drained.
Naturalised Sustainable Urban Drainage
System features which are adequate
for the development and appropriate
maintenance arrangements requires to be
in place;
The capacity of the functional flood plain
to store water must not be reduced;
Development must not result in additional
discharge of surface water;
It  has  been  demonstrated that a safe
operation and access/egress can be achieved
during the design flood event.
The risk of flooding to the development itself
can be satisfactorily mitigated;
Developments require to maximise the amount
of permeable surfaces;
Existing flood protection/defence mechanisms
are protected with development not
compromising the potential for future flood
management proposals;
Unnecessary engineering works in the
water environment will be resisted, including
culverting of existing water sources. Opening
existing culverts will be welcomed and
encouraged;
Where additional flood protection measures
are required consideration of natural
flood management and the use of green
infrastructure which can be integrated into the
site is required;
Land raising will not be accepted unless
compliance with national policy can be
demonstrated and any loss of local flood
storage capacity can be secured;
It must be demonstrated that there is the ability
to effectively deal with foul drainage from all
developments; and,
Flooding and drainage measures should
aim to have a positive effect on the water
environment and natural environment in and
around the site;
Where the risk of flooding is deemed
unacceptable, the proposal will not be permitted. 
Where a flood risk assessment or drainage
assessment is required, national guidance along
with the principles set out above and advice set
out in flood risk planning advice notes produced
by Renfrewshire Council and SEPA’s Flood/
Drainage guidance must be considered.
Further guidance on the content of a flood risk
assessment is contained in Appendix 1.

Page 18

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  18
DELIVERING THE INFRASTRUCTURE  STRATEGY - DEVELOPMENT GUIDANCE
Renewable and Low Carbon Energy Developments
An increase in the proportion of electricity produced from renewable sources and the
recovery of waste heat will be supported in principle where they are appropriate in
terms of the location, siting and design.
All proposals will be considered against Policy I4 Renewable and Low Carbon Energy
Developments of the Local Development Plan having regard to any individual or
cumulative significant effects of the development proposal.
All proposals requires to ensure that:
Significant visual intrusion within
the landscape in terms of siting,
scale, location, design, etc. has been
minimised;
There will be no significant
unacceptable adverse impact on the
natural or historic environment or
water environment within the area;
During the process leading to the site
selection, consideration must be given
to suitable alternative sites, with the
selection of the proposed site justified;
Development proposals for renewable
or low carbon energy developments to
include proposals for energy storage
on site wherever possible;
There is no significant unacceptable impact
on the amenity of nearby residents or
other existing/allocated uses, in terms of
statutory air quality objectives, noise or other
nuisances including glare and shadow flicker;
There will be no significant unacceptable
impacts on the transport network including
Glasgow Airport, additional traffic generation
and/or road safety. Proposals must
demonstrate that any additional impacts can
be mitigated.;
The individual or cumulative impact of the
proposed development, including any other
existing and approved similar developments;
will not lead to an unacceptable impact on
the environment, amenity, community or
recreational interest;
There will be no loss of public access routes, open
space or recreational facilities. If proposals do have an
impact, then alternatives or mitigating measures must
be provided;
Arrangements are in place to restore the site to an
acceptable standard after the operation has ceased;
SEPA’s Thermal Treatment of Waste Guidelines must
be followed where development involves recovering
energy from waste;
Where technically feasible and financially viable,
development with a high heat demand should seek
to be co-located with and make use of heat supply
sources;
All Major Development planning applications require to
consider the feasibility of meeting the development’s
heat demand through a district heating network which
could serve, or could easily be adapted to connect to
a wider network if and when required to give greater
energy efficiency;
Where suitable, the potential to connect new projects
to off-grid areas are considered; and,
The scale of contribution from the development to
renewable energy generation targets and the effect
on greenhouse gas and carbon emissions is fully
demonstrated.

Page 19

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   19
DELIVERING THE INFRASTRUCTURE  STRATEGY - DEVELOPMENT GUIDANCE
Solar PV Farms
In addition to the guidance on Renewable and Low Carbon Energy
Developments all development proposals for Solar PV Farms will be
considered against the following criteria:
Development requires to be sited to
minimise the visual effect on landscapes
and provisions will be made to screen the
development using natural features such
as hedges and/or trees;
Where a development is proposed on
prime quality agricultural land1 , on land
with an environmental designation, or of
historical significance, applicants must
provide sufficient information on the
potential impact on this existing land use
and the mitigation that will be provided;
There is no significant impact on
landscape/visual amenity, aircraft, rail and
road safety in terms of glint and glare;
Any lighting and security fencing requires
to be kept to a minimum. Natural features
must be used where possible to assist in
site security and screen security fencing;  
1  Agricultural land identified as being Class 1, 2 or 3.1 in the land capability classification for agriculture
developed by Macaulay Land Use Research Institute (now the James Hutton Institute)
Access tracks to the solar farm requires to be
kept to a minimum to better enable the site to be
returned to its previous condition;
Construction compounds needed to enable the
development requires to be located to minimise
its environmental and amenity impact. Details of
the size and location of the site office, machinery,
plant and construction materials requires to be
provided;
Foundations which enable the ground to be
returned to its previous use will be preferred.
Trenching and foundations require to be kept to
a minimum;
An appropriate ground maintenance programme
will be required, and solar farms require to be
designed to enable management through grazing
by small livestock. This would require panels to
be positioned at least 70cm above ground level
and cabling to be suitably protected;
On completion of the construction works, a
Post Construction Road Survey will require
to be undertaken by the applicant and any
remediation works required will be agreed
in writing with Renfrewshire Council. Any
remediation works will require to be funded
by the applicant; and,
Solar PV Farms are considered to be a
temporary use of land and will require to
be returned to its previous use on expiry of
planning consent. Any decommissioning
works will be agreed with Renfrewshire
Council and funded by the applicant.

Page 20

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  20
DELIVERING THE INFRASTRUCTURE  STRATEGY - DEVELOPMENT GUIDANCE
Communications and Digital Infrastructure
The expansion of the communications network including telecommunications, broadband and
digital infrastructure will be supported in line with the criteria set out in Policy I6 Communications
and Digital Infrastructure of the Local Development Plan.
Sufficient information requires to be provided with a development proposal to ensure that it
is located in an appropriate location and unlikely to have any significant adverse effects. The
following information will be required depending on the development proposal:
An explanation of how the proposed equipment fits into the wider network;
A description of the siting options and design options which satisfy operational
requirements, alternatives considered, and the reasons for the chosen solution;
Details of the design, including height, materials and all components of the proposal;
Details of any proposed landscaping and screen planting, where appropriate;
An assessment of the cumulative effects of the proposed development in combination with
existing equipment in the area;
A declaration that the equipment and installation is designed to be in full compliance with
the appropriate ICNIRP guidelines for public exposure to radiofrequency radiation; and,
An assessment of visual impact, if relevant.
Provision for Waste Recycling in New
Developments
Development including residential, commercial
or business/industrial properties requires to
include provision for waste separation and
collection to meet the requirements of the
Waste (Scotland) Regulations in line with
Renfrewshire Council’s Refuse Collection
Standards.
Suitable and well-designed provision for
the collection and storage of waste must be
conveniently sited for both the householder (or
other user) and the waste collection authority.

Page 21

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   21
Creating
Successful
Places
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Creating Places
Successful places are areas which support a mix of uses, where people live, work and enjoy leisure time.
Places must be adaptable to future uses, balancing the interests and opportunities that are right for the
place.
Detailed guidance is set-out in Renfrewshire’s Places Design Guidance which identifies a range of
considerations that form the basis of good ‘places’ design. This document is available to view at 
www.renfrewshire.gov.uk.
Development proposals require to be prepared in accordance with Renfrewshire’s Places Design
Guidance in addition to the guidance included in this document.
Access and
Connectivity
Environment
and
Community
Context and
Character
Buildings and
Design
Layout and
Form

Page 22

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  22
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Alterations and Extensions to
Existing Properties
Development will be considered in
relation to the following criteria:
The development requires to be
of an appropriate scale, size and
massing which does not constitute
over development and reflects the
established development pattern;
Reflect the design and materials of
the existing house and the character
of the surrounding area; and,
The amenity of the neighbouring
residents or the surrounding area is
protected.
Residential Development within
Garden Grounds
Development will be considered in
relation to the following criteria:
The position, orientation and access
to the proposed house and the
relationship with the existing and
surrounding properties requires to
maintain and respect the established
development pattern;
The new residential unit will not result
in back-land development;
The scale, size, massing and
associated garden space of the
proposed new residential unit will be
similar to surrounding dwellings in
the area; and,
The privacy and amenity of the
existing and proposed residential
units will be comparable and
protected.
Change of Use from Amenity Space to Garden
Ground
Enlarging garden areas by extending them into
amenity space and areas of landscaping requires
planning permission to change amenity space to
garden ground. 
Assessment of the proposals will require to be
considered in relation to the following criteria:
Proposals will not significantly affect the character
and appearance of the amenity space, detracting
from the amenity of the surrounding area;
Development will not significantly fragment or
incrementally erode amenity space;
The proposals will not lead to a deficiency in
recreational and/or public open space in the area
or adversely impact on any active travel or green
networks;
Development will not result in the loss of trees that
make a significant contribution to the area or result
in a detrimental impact on the visual amenity of the
area; and,
The development will not lead to an undesirable
precedent being set.
All proposals will be assessed in
relation to the Householder Developer
Guidance Guidance which is available
on the Council’s website at https://
www.renfrewshire.gov.uk/article/3041/
Development-Planning-Guidance.
This guidance is currently being updated
and will be presented to a future Board.

Page 23

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   23
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Residential Use of Centres
New residential developments in the upper floors of the
town  centres of Paisley, Renfrew and Johnstone will be
encouraged in  principle when they are in accordance
with the Centres policies.
Upper Floor Residential Developments
Where buildings are not fit for purpose and have become
vacant, and it can be demonstrated that conversion of
the existing buildings is not viable or practicable and will
not allow a new use to operate, then consideration will be
given to redevelopment.
Re-Use/Redevelopment of Institutional Premises
All such proposals will be subject to the approval of a
masterplan/development brief to ensure protection of
environmental qualities, there is a high-quality design and
the density of development is appropriate to the location.

Page 24

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  24
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
The potential impact on the amenity of the area;
The level of provision of HMO’s in that locality; and,
The relevant Local Development Plan policy and associated 
Supplementary Guidance which relates to the application site.
House in Multiple Occupation (HMO)
Planning permission is required where use as a HMO is considered to
be a ‘material change of use of land or buildings’.
The Town and Country Planning (Use Classes) (Scotland) Order 1997
defines a house as being the sole or main residence of a single person,
or any number of persons living together as a family, or not more than 5
residents living together as a single household where care in provided
for residents.
Where more than 5 residents live together as unrelated individuals this
is considered to be a material change of use, requiring planning consent.
Planning permission is also required where three or more unrelated
persons or three or more families are living in a flatted property.
All proposals for a HMO will be considered in relation to the following:
All members of the same family, or,
All members of two families, and which accommodation is (a) a
house, or is, or forms part of, any premises or group of premises
owned by the same person and its occupants share one or more
of the basic amenities with each other; and is occupied by those 3
or more persons as an only or main residence, or (b) of such type,
or which is occupied in such manner, as the Scottish Ministers may
specify.
Other Requirements
A building warrant may be required if structural alterations are proposed
to be undertaken to the premises for which a HMO licence is sought.
The applicant should contact Renfrewshire Councils Building Standards
Section to discuss the need for a Building Warrant.
The licensing of HMOs operates under the Housing (Scotland) Act
2006. A license may be required where any living accommodation is
occupied by 3 or more persons who are not either:

Page 25

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   25
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Completed affordable units;
Units completed by the developer
and subsequently transferred  to the
Council/ Registered Social Landlord on
a design and build  basis. These units
must also comply with the Scottish 
Government’s grant funding criteria in
terms of their design standards;
The provision of an appropriate area of
serviced land being  transferred to the
Council or a Registered Social Landlord
for the development of the required
number of affordable units. Where land
is transferred, it must be provided fully
serviced and free of constraints;
Affordable Housing
Early discussion (pre-application stage) with
the planning authority will be required to
establish affordable housing requirements
and the most appropriate mix of affordable
housing to be provided on all sites of 50 or
more dwellings providing up to 25% of the
total site capacity as affordable homes.
The provision of affordable homes must be
fully integrated into new development and
requires to be delivered in the form of:
Off-site delivery;
In specific incidences where a developer can prove that on site provision of Affordable Housing is not
viable, and the Council is in agreement, an off-site provision may be considered.
In such cases discussions on offsite delivery must be made in advance with both Planning and Housing
and requires to ensure that the alternative off-site provision is:
A site where housing is supported in principle by the local development plan;
The proposed alternative site makes an equally satisfactory contribution to meeting unmet local
housing needs as the principal development site and is capable of delivering the number of affordable
units required on the principal site;
Located within the same submarket area as the development site (as defined in Renfrewshire Local
Housing Strategy). It will be for the Council to decide if an alternative site outside the submarket area
is acceptable;
Located within an area that does not have a concentration of affordable housing. It will be for the
Council to determine if there is a concentration, therefore a developer wishing to provide offsite
contributions must contact the Communities & Housing Service in advance of making an application;
Where the developer is not constructing the affordable housing the site should be transferred to
the Council or a Registered Social Landlord at an agreed value. The site must be transferred to
the Registered Social Landlord or the Council prior to the delivery of any units on the primary site.
Only that portion of the site necessary to effectively deliver the contribution need be transferred.
The transferred land must be deliverable and free from constraints. It will be for the Council or an
Registered Social Landlord to determine its acceptability;
Where the developer is actually delivering the affordable housing on the secondary site, the release
of market housing on the primary site will be linked to the delivery of affordable housing.

Page 26

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  26
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Commuted sum
In exceptional circumstances, where sites are unsuitable for affordable
housing, where off site provision cannot be provided, where there are sound
reasons for not transferring part of the land for affordable units or there is no
funding commitments from the Scottish Government, a financial contribution
to the council (a commuted sum) will be acceptable in lieu of on or off-site
provision. Any proposal by a developer to address affordable housing through
a commuted sum must be supported by a viability assessment which sets out
why onsite provision is not suitable.
The instances where a commuted sum may be acceptable include:
Where there is a high concentration of affordable housing in the area and
the provision of a commuted sum would help achieve more balanced
communities elsewhere in the housing market area;
Where the Councils Communities and Housing Service recommend
that this is the most appropriate form of contribution in considering the
Councils strategic housing priorities;
Site constraints affecting development viability;
Where all reasonable efforts to identify other opportunities for on or off-
site provision have been exhausted.
The basis for a commuted sums is to allow flexibility to ensure
the right houses to be built in the right areas, in particular where
in accepting the commuted sum this would achieve more, higher
quality, or better-located affordable housing elsewhere; help
support the delivery of a preferred tenure of affordable housing
elsewhere; or support the delivery of non-new build affordable
housing projects throughout the area.
Financial contributions will be paid to the Council and then
reinvested in the provision of affordable housing in the same
Housing Market Sub Area (as defined by the Renfrewshire Local
Housing Strategy). As well as funding the actual housing build, the
funds may also be used to assist the purchasing of sites or property,
or to meet particular infrastructure constraints, in order to assist
the delivery of affordable housing on the ground and promote the
direct provision of affordable accommodation through the Council
or Registered Social Landlord on other sites.
The value of the commuted sums will be determined independently
by the District Valuer (DV) or by a chartered valuation surveyor
suitably experienced in the type of property and locality and
appointed by mutual agreement between the parties, failing which
the chairman of the RICS in Scotland. The developer will be required
to cover the costs incurred to carry out this valuation.
Commuted payments must be paid by the developer at appropriate
phases of the site’s construction period, as agreed through a legal
agreement.
Commuted sum
In exceptional circumstances, where sites are unsuitable for affordable
housing, where off site provision cannot be provided, where there are sound
reasons for not transferring part of the land for affordable units or there is no
funding commitments from the Scottish Government, a financial contribution
to the council (a commuted sum) will be acceptable in lieu of on or off-site
provision. Any proposal by a developer to address affordable housing through
a commuted sum must be supported by a viability assessment which sets out
why onsite provision is not suitable.
The instances where a commuted sum may be acceptable include:

Page 27

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   27
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
The affordable housing provision can be across a range of tenures,
including social housing for rent, mid-market rented accommodation,
shared ownership housing, shared equity housing, housing sold
at a discount (including plots for self-build), and lowcost housing
without subsidy.
Where new affordable homes includes the provision of intermediate
housing for rent or sale, discount sale and entry level market starter
homes, units may require a burden to be placed on their title to
ensure that future sales are made to priority groups at an affordable
cost. Each site will be considered on its merits.
When a new planning application is submitted which would increase
the overall capacity of a site, the additional units only would be
required to meet the terms of Policy P3. If the planning application
relates to amendments which would not affect overall site capacity
including changes to layout or house types – the terms of the policy
would not apply.

Page 28

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  28
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Gypsy/Travellers and Travelling Show People Development
Complement and be compatible with the character and
appearance of the surrounding area providing an acceptable
residential environment, amenity and setting;
Residential amenity and character
Development sites for Gypsy/Travellers and Travelling Show people will be considered in
relation to the following criteria:
The number and nature of the pitches provided requires to be
appropriate to the site size and general area;
Density
Where sites are to be occupied on a permanent basis, the siting/
placing of caravans, chalets or other accommodation requires to
ensure that prospective occupants have an acceptable level of
residential amenity with regards to privacy and spacing;
Layout
A suitable means of access requires to be provided. The site
requires to be well connected and/or is within a reasonable
walking distance from services, education, community uses, health
services, public transport and other facilities;
Access
The development makes provision for essential infrastructure such
as water, sewerage disposal,  electricity, lighting, refuse collection,
internal roads as well as access for emergency vehicles. Provision
of power through a sustainable means is encouraged;
Services for the site
Boundaries and landscaping around sites requires to be
sympathetic to, and in keeping with, the  surrounding area. Parking
and storage of material and/or equipment on the site requires to be
satisfactorily accommodated and appropriately screened where
required.
Boundaries and landscaping
Demonstrate that there is a need within the local area for a transit or
permanent site and the proposal would help address the identified
need;
Location needs

Page 29

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   29
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Green Network and
Infrastructure
Appropriate provision is made for the
continuing use of active travel networks;
Core paths, rights of access, open space,
woodland and the water environment
within or alongside the boundary of the
development proposal will be integral to
the design and layout of the development
from the outset of the planning process;
The provision of good quality green space,
paths, cycle routes and associated green and
blue networks, is an important element of
place making and regeneration.
Investing more in nature, especially in close
proximity to where people live and work, can
deliver improvements in physical activity
through sport and recreation and mental
health, as well as having a positive impact
on the long-term sustainability and quality of
communities created.  
New Development Proposals will be
considered against the following criteria:
Development proposals requires to
facilitate the provision and long-term,
integrated management and maintenance
of green infrastructure;
Access is provided to green networks
from new developments;
Any potential impact to existing or
proposed green networks, core paths or
rights of way and other important routes,
can be adequately addressed and/or
suitable alternative provision is made;
Development requires to enhance the
green network by ensuring that on site
green infrastructure is incorporated and
designed to be integral to the overall
development and will link into and
enhance the wider green network; and,
New development requires to incorporate
the ‘Getting It Right for Every Child’
approach.

Page 30

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  30
DELIVERING THE PLACES  STRATEGY - DEVELOPMENT GUIDANCE
Open Space
The proposed development is for
recreation or physical activity use and it
improves the quality and range of facilities;
There is a long-term excess in the
provision of pitches, playing fields and
public open space in the wider area,
taking into account long term strategy for
provision, estimated demand and overall
recreational and amenity value;
The development will not lead to a
significant net loss of open space;
The proposal incorporates the retention
or enhancement of the existing facilities
on part of the site, while enabling
redevelopment of the surplus section of
the site for another purpose. In addition,
there is no significant adverse impact on
the amenity of nearby residents;
All areas of open space, not shown on the
Proposals Maps which includes, play parks and
small areas of recreation and amenity space,
will be protected from development unless the
following criteria can be satisfied:
Open Space Provision in
New Developments
Open space, amenity space and play provision
shall be located in new developments, where
appropriate, in a way which contributes to the
site, surrounding area and the green network.
The provision for open space will require to be in
accordance with the Council’s ‘Renfrewshire’s
Places’ Design Guidance. This document is
available to view at www.renfrewshire.gov.uk.
Alternative provision of equal or greater
community benefit and accessibility
would be made available on another site;
The benefit of the proposed development
to the public clearly outweighs the present
open space value of the site; and,
The amenity of the surrounding area will
not be significantly affected by the loss
of open space and by the nature of the
proposed development.

Page 31

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   31
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Green Belt Development Criteria
There will be no loss of prime quality
agricultural land  or agricultural land2 of lesser
quality that is locally important in line with
Scottish Government  Policy;
Any adverse impacts on the qualities of wild
land are overcome by siting, design or other
mitigation;
Traffic and access infrastructure can be
sensitively accommodated;
No significant effects on public water supply
and water environment from any pollution risk;
The development links to the existing green
network and active travel routes or provides
new enhanced routes, where appropriate;
Proposals to protect and provide access to
open space have been incorporated;
Policy ENV1 Green Belt sets out the range of
uses which could be considered acceptable in
principle within the green belt. All development
proposals within the green belt will also be
accessed against the following development
guidance:
Development will not have a significant
detrimental impact on the local landscape
character. Development layout, design and
siting must reflect local landscape character
and respect and incorporate important
landscape features such as traditional field
enclosures, water courses, woodlands and
skyline;
It can be demonstrated that there is careful
consideration of the siting, design, scale and
grouping of any buildings and infrastructure;
Appropriate landscaping proposals have been
incorporated including the provision of well-
designed boundary treatment;
There are adequate services available for the
development, or this can be provided;
There is no significant detrimental effect
on identified nature conservation interests,
including species and habitats; and,
All buildings for conversion are to be
structurally sound and capable of conversion
without substantial rebuilding.
2  Agricultural land identified as being Class 1, 2 or 3.1 in the land capability classification for agriculture
developed by Macaulay Land Use Research Institute (now the James Hutton Institute)

Page 32

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  32
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Housing in the Green Belt
The development is required to maintain
and support an established activity
that is suitable in the green belt and is
ancillary and within the boundary of the
established use;
It is demonstrated that there is a need for
the residential use to be located out with
the settlement;
Buildings which have special architectural,
traditional or historic character which
contribute to the setting of the area may
be converted or re-used for residential
where it can be demonstrated that it is no
longer suitable for the purpose originally
intended, with the original building
forming the main part of the development;
Residential development proposals will be considered in relation to the following criteria
(residential use considered appropriate in principle where it is a housing land shortfall remedy
which satisfies Policy ENV1 Green belt and Policy 8 of Clydeplan 2017):
The proposal demonstrates outstanding
quality of design, is of an appropriate scale
within its setting and makes a positive
contribution to the site and surrounding
area;
The proposal integrates with, complements
and enhances the established character
of the area and has no significant
detrimental impact on the landscape
character; and,
Replacement dwellings must reflect
the specific character of the location,
fit well with the surrounding landscape
and achieve a high design standard and
environmental quality. Replacement
dwelling(s) require to be of a similar scale,
character and massing to other residential
units in the surrounding area.

Page 33

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   33
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Natural Heritage
Natural heritage makes an important contribution to the local character, identity and quality of
an area. A high-quality natural environment, water environment, landscape setting and diverse
biodiversity and habitats complement a place, and these assets require to be protected with
opportunities for enhancement.
All developments require to follow the principles of the mitigation hierarchy set out in Figure 4 and
where possible will enhance the natural environment.
Development proposals require to prevent or avoid impacts on the natural environment, and measures
require to be made to minimise and reduce any unavoidable impacts. Compensatory planting or habitat
provision will be required to help restore the natural environment.
Figure 4 – Mitigation Hierarchy
Avoid
Reduce 
Compensate

Page 34

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  34
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Trees, Woodlands and Forestry
Protect ancient semi-natural woodland,
along with other woodlands, hedgerows and
individual trees from adverse impacts resulting
from development;
Promote the planting of broad leaved and
native species;
Protect and promote positive management of
trees for their nature conservation interest;
Promote, where appropriate, the development
of community woodlands, particularly where
they are close to urban areas and where
links to the green network, green belt and
neighbouring settlements may be facilitated;
and,
Encourage the planting of appropriate trees as
an integral part of new development.
To maximise the benefits for a diverse natural
environment, new development proposals
require to:
In line with the Scottish Government’s control
of woodland removal policy and the Mitigation
Hierarchy in Figure 4, where woodland or individual
trees are removed in association with development,
developers will provide compensatory planting.
Biodiversity  
Not significantly affect existing
species, habitats and ecosystems;
Be of an appropriate design and
layout to encourage species dispersal
through improving connectivity and
habitat availability; and,
Avoid adverse effects on species
and habitats. If required, mitigation
measures and implementation
strategies must be provided,
or compensation achieved by
biodiversity offsetting.
To maximise the benefits for a
diverse natural environment, new
development proposals require to:
The provisions of this guidance does
not relate to individual householder
developments.
Where there is likely to be an adverse
impact on biodiversity an ecological
appraisal will be required in line with the
guidance in Appendix 1.

Page 35

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   35
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
International Designations
Development proposals requires to consider potential
significant impacts on European Sites. Development must
not have an adverse effect on the integrity of the Inner Clyde
Special Protection Area (SPA) with over-wintering Redshank
population; Renfrewshire Heights SPA with a breeding
population of Hen Harrier or the Black Cart SPA with over-
wintering Whooper Swans all internationally important birds.
Development proposals within 150m of Inner Clyde SPA, the
Whooper Swan feeding area around Black Cart SPA or within/
adjacent to Renfrewshire Heights must be accompanied
by an expert assessment to inform a project-level Habitats
Regulations Appraisal (HRA). This may require a study of
Redshank/Swan behaviour in the affected areas of the SPA,
which is likely to involve a survey over at least one wintering
season. Depending on results, it may require mitigation
measures to address issues caused by the development.
Pre-application discussion with Nature Scotland regarding
preparation of the assessment is recommended. Account
requires to  also be taken of the HRA undertaken in preparation
of the Renfrewshire Local Development Plan.
The Council as ‘Competent Authority’ will carry out the
HRA. If the proposal is likely to have a significant effect, the
Council must undertake an Appropriate Assessment of the
implications of the development.
Development which could harm any European Sites will only
be approved in exceptional circumstances.
National Designations
Development will require to safeguard
the nature conservation value of Sites
of Special Scientific Interest (SSSI).
Development will only be permitted
where:
The objectives of designation and
the overall integrity of the area will
not be compromised; or
Any significant adverse effects
on the qualities for which the
area has been designated are
clearly outweighed by social,
environmental or economic benefits
of national importance.
Wild Land
Wild land is a nationally important asset.
Development proposals which could
impact on this land will be required to
demonstrate that any significant effects
on the qualities of the wild land can
be overcome by siting, design or other
mitigation.
Local Designations
Development will require to protect
and where possible enhance Sites of
Importance for Nature Conservation
(SINCs) and Local Nature Reserves
(LNRs) to ensure that their nature
conservation interest is maintained. 
Development requires to promote links
between sites which enable species
dispersal.
Development proposals covered by
the SINC designation will be assessed
against:
The social and economic benefits
of the development proposal;
Any significant impact on the
nature conservation interest of
the site being mitigated; and,
The provision of satisfactory
compensatory nature conservation
benefits.

Page 36

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  36
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Regional Parks
Any development proposal within Clyde Muirshiel Regional Park
requires to demonstrate that:
It is for a use which will bring social or economic benefits
to the area;
There is no significant impact on the nature conservation,
landscape character or heritage resources;
The development does not cause significant conflict with
neighbouring land uses;
There are opportunities for the provision of active travel
and/or habitat networks to be maintained or enhanced;
Any proposed building or structure is appropriate in design
and scale to its surroundings;
The development has no significant impacts on the visual
amenity of the area; and,
Development does not prevent or significantly impact upon
recreational access to the surrounding area.

Page 37

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   37
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Conservation Area
Development within conservation areas will
require to protect, preserve and/or enhance the
visual amenity and historic/architectural character,
local landscape character, including the setting,
buildings and open space.
The following criteria must be considered for
development within Conservation Areas:
Built and Cultural Heritage
High standards of design must be demonstrated
which have regard to the architecture and character
of the area, and ensure the maintenance and
enhancement of local distinctiveness;
New built development must have regard to
massing, height, fenestration and building materials;
Proposals must have regard to their wider impact
in terms of visibility from external locations and
the preservation of landmarks and views from and
through the development site;
The redevelopment of gap sites will be encouraged,
such development will be required to enhance the
character and distinctiveness of the conservation
area;
Encourage the redevelopment and refurbishment
of historic buildings that are in need of substantial
and appropriate repairs’;
Where the demolition of an unlisted building is
proposed, consideration must be given to the
contribution the building makes to the character and
appearance of the conservation area. If a building
makes a positive contribution to the area, there is a
presumption in favour of retaining it. Proposals for
demolition will not be considered in the absence
of a planning application for a replacement
development that enhances or preserves the
character of the surrounding area: and,
Trees deemed to contribute to the overall
townscape require to be retained and provision
made for their future management. Where this is not
appropriate replacement trees of the same species
will be required.
Proposals for development adjacent to a Conservation
Area must not have a significant adverse effect on its
architectural and historic character and wider setting.

Page 38

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  38
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Listed Buildings
Use of sympathetic and appropriate materials
and finishes;
Extensions/alterations do not significantly
detract from the character of the building;
The layout, design, massing, scale and form of
the development require to be sensitive to the
buildings character, appearance and setting;
Landscaping and boundary enclosures
preserve the setting of the listed building; and, 
Planting must be reinforced or re-established.
Listed buildings and their settings require to
be protected and enhanced.
Sensitive restoration, re-use and maintenance
of listed buildings is encouraged. 
Development proposals relating to listed buildings
and their settings will require to consider “Managing
Change in the Historic Environment” which is a
series of guidance notes produced by Historic
Environment Scotland and cover topics about
making changes to the historic environment.
Proposals require to meet the following:
Enabling Development
Development will secure the long-term future
of the place;
It will meet the costs of resolving problems
arising from the inherent needs of the place;
Sufficient financial assistance is not available
from any other source;
It can be demonstrated that the amount
of enabling development is the minimum
necessary to secure the future of the place;
The development does not significantly conflict
with other planning policies or guidance; and,
The resultant development must be sited
carefully to preserve or enhance the character
and setting of the historic building.
Enabling development as a potential generator
of funding to assist in the consolidation
and/or rehabilitation of listed buildings will
be considered in principle. The enabling
development will not materially harm the
heritage values of the place or its setting.
Development proposals also requires to meet
the following criteria:
Demolition of Listed Buildings
That the building is not of special
interest;
That the building is incapable of
repair;
That the demolition of the building
is essential to delivering the
significant benefits to economic
growth or the wider community;
and,
That the repair of the building
is not economically viable and
that it has been marketed to
potential restoring purchasers
for a reasonable period, at a
price reflecting its location and
condition.
There is a presumption against
demolition or other works that
adversely affect the special
interest of a listed building or its
setting.
No listed building will be demolished
unless it can be clearly demonstrated:

Page 39

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   39
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Unscheduled Sites of Archaeological Significance
The overall benefit of the development
will outweigh the benefits of preserving
the archaeological resource;
That there is no suitable alternative
location for the development;
The siting and design of the proposal will
minimise the damage to the archaeological
resource;
Scheduled Ancient Monuments and their settings require to be safeguarded. Where a
proposed development potentially has a direct impact on a scheduled monument, Scheduled
Monument Consent is required, in addition to any other necessary consents. Historic
Environment Scotland manage these consents.
Gardens and Designed Landscapes Scheduled Ancient Monuments and Archaeological Sites
Protection and enhancement of unscheduled sites of archaeological significance and their setting is
important.
When considering development proposals affecting a location that is known to, or considered likely to
contain an archaeological interest, the development will require to meet the following criteria:
Where approval is given, and preservation
cannot be achieved, adequate provision must
be made by the developer for the excavation
and recording of the site remains (prior to and
during development); and,
Where an archaeological interest becomes
apparent during development, provision must
be made by the developer for appropriate
recording of the site remains.
Proposals for development which may have an adverse impact on sites of archaeological significance
shall not be permitted.
Where it is demonstrated that preservation cannot be achieved, excavation and recording of the site
may be undertaken.
Development will not be permitted to proceed until suitable excavation and recording has taken place.
Gardens and Designed Landscapes offer
significant opportunities for education,
employment, tourism and recreation. 
They also provide a valuable green network
and make a major contribution to the wider
landscape of Scotland. Gardens and designed
landscapes are by their nature evolving. 
Development affecting gardens and designed
landscapes will require to protect and,
where appropriate, enhance the specific
qualities, character and integrity of the site. 
Development will require to:
Identify and understand the significance
of a garden and designed landscape and
identify the current baseline;
Assess the potential impact of a proposed
change on the site and its setting; and,
Address any adverse impacts by
identifying opportunities for mitigation
in line with mitigation hierarchy (avoid,
reduce, compensate). Compensatory
measures should only be considered
once opportunities for avoidance and
reduction have been fully explored.

Page 40

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  40
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
The Water Environment
The water environment has been
progressively improving over the years
and to assist in continuing this trend
developments must mitigate impacts
on the water environment, as well as
enhance biodiversity and recreational
opportunities.
The River Basin Management Plan for the
Scotland River Basin District sets out actions
to improve water quality, improve physical
condition, improve access for fish migration,
improve water flows and levels, and assist in
preventing the spread of invasive non-native
species. To help deliver the objectives set
out in the River Basin Management Plan,
careful consideration is given to the location
and design of new development in, around
or affecting water bodies. Developments
require to make provision to improve the water
environment, inclusive of groundwater.
The Local Flood Risk Management Plan for
Clyde and Loch Lomond Local Plan District
details how and when the actions to deliver the
goals set in the Strategy are to be delivered,
which organisation is responsible, and how
they are to be funded.
Developments with a marine component or
implication along the Clyde, provided the
proposed development is consistent with
Scotland’s National Marine Plan and the
emerging Regional Marine Plan for Clyde
Marine Region, will be supported.
All marine proposals require to identify
environmental impacts and mitigate against
these to ensure there are no unacceptable
adverse impacts.
The following criteria requires to be considered
for all proposals:
Development will not significantly
compromise the water environment in
terms of its ecological status and require 
to improve the water body status and not
prevent it from being able to achieve good
ecological status in the future;
There will be no significant impact on
water quality in adjacent watercourses,
groundwater bodies or areas downstream;
Natural hydrology requires to influence
the site’s overall design and layout,
encouraging minimal engineering works;
Design of development requires to
integrate SUDS and/or provide innovative
landscapes which can retain flood water
as well as deal with water quantity, water
quality and amenity;
The development would lead to the
creation, enhancement or better
management of existing habitats and
biodiversity within the water environment,
leading to control of invasive non-native
species and/or improvements to fish
passage; and,
Protection and enhancement of
watercourses, floodplains and wetlands
which are important contributors to the
water environment for alleviation of flood
risk, wildlife, recreation and the amenity
needs of the community.

Page 41

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   41
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Noise 
New proposals for residential development should avoid areas
where aircraft noise levels are in excess of 57dB LAeq.
Applications for residential development will be refused unless a noise
assessment and noise-insulation measures can demonstrate that an
appropriate level of residential amenity could be achieved.
When preparing new residential development proposals early pre-
application discussions with the planning authority are advised to
confirm whether a noise assessment is required to demonstrate an
appropriate level of residential amenity. The production of a noise
assessment will be complainant with Planning Advice Note 1/2011:
planning and noise.
Air Quality
Any potential significant impact on local air quality from
development within or adjacent to the existing Air Quality
Management Areas will require to be mitigated.
In assessing an application for such developments, the submission of an
assessment of the likely impact of the development on air quality and
any mitigation measures that are proposed will be required. Appendix 1
sets out what is required as part of an air quality assessment.

Page 42

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  42
DELIVERING THE ENVIRONMENT STRATEGY - DEVELOPMENT GUIDANCE
Contaminated Land
In assessing an application for
development, there is a requirement
to provide the necessary information
to establish whether contamination is
present or not.
This shall be in the form of a report from
a professionally qualified source and may
involve undertaking site investigations and risk
assessments to identify any actual or possible
significant risk to public health or safety, the
water environment, or other environmental
receptors that could arise from the proposals.
Consideration must also be given to both
radioactive and nonradioactive sources of
contamination. Where there is known or
potential contaminated land, gases or ground
instability on a site, any development must take
account of this in both its design and the type
of use proposed. Should the development
be approved, conditions may require to
be attached to the consent to ensure that
the necessary remediation action will be
undertaken to prevent unacceptable risks to
human health or the environment before the
development proceeds.
Pipelines and Major Hazards
Within Renfrewshire there are a number
of high pressure pipelines and sites where
hazardous substances are stored. For
each of these sites a consultation zone has
been established by the Health and Safety
Executive to ensure that only appropriate
new or replacement development takes
place and that there is no increased risk to
public safety.
Proposals for development involving the
use, transmission or storage of hazardous
substances will not be supported where there
would be significant adverse impacts on the
environment or health and safety.
Burial grounds and Cemeteries
The development of new cemetery sites/
graveyards or extensions to existing
sites has the potential to result in an
impact on the local water environment
and the groundwater underlying the site.
When planning such sites or extensions
to an existing site, applications will
require to be supported by a site
investigation to consider the impact on
the water environment. The extent of site
investigation should be proportionate to
the size of the proposed development.
Planning applications for burial sites must
be supported by the information detailed in
SEPA’s Groundwater Protection Policy and
SEPA’s Guidance on Assessing the Impacts of
Cemeteries on Groundwater.

Page 43

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   43
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Transport Assessment
Existing infrastructure and characteristics of the site and its
surroundings;
Baseline transport data;
Travel characteristics including pedestrian and cyclist
information;
A transport assessment requires to be carried out where
a change of use or new development is likely to have
significant transport implications. A transport assessment
is undertaken to assess the potential impact from traffic
and transport as a result of implementing a development. It
can also identify measures which reduce the need to travel,
promoting more sustainable patterns of development,
reducing car use and encouraging walking, cycling and use
of public transport. An early indication of the scale of any
potential transport impact arising from a development will
influence the level and type of assessment required.
A transport assessment requires to identify the main transport
issues relating to the proposed development and must detail the
following:
The above requirements are not exhaustive. The scope of the transport
assessment should be discussed with the planning authority as early as possible,
and also Transport Scotland where it is likely the proposed development will have
an impact on the trunk road network. More details on the requirements can be
found in Renfrewshire Council’s Road Development Guidance and/or in Transport
Scotland’s Transport Assessment Guidance (2012).
Existing public transport provision;
The road network surrounding the site;
Impacts from any committed developments;
Description of the proposed development, including parking provision;
Estimates of person and vehicle trip generation for the proposed development;
Proposed access arrangements for walking, cycling, public transport and
vehicles;
Proposed transport improvements or potential transport interventions;
How the location, layout and design of the development will influence the
choice of travel mode, potentially through preparation of a Travel Plan;
The transport implications of freight or service operations;
Likely content of any planning obligation (Section 75 Agreement); and,
Road safety, and the need for a road safety audit

Page 44

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  44
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Drainage Assessment
Drainage assessment must provide an assessment of the drainage issues relevant to
development proposals with the identification of a satisfactory provision of sustainable
drainage infrastructure where practical.
An assessment requires to include the following information:
An examination of current and historical
drainage patterns;
A detailed plan of the development
proposal;
Information on how drainage design
provides waste and sustainable surface
water drainage;
Details of how Sustainable Urban Drainage
Systems (SUDS) will be incorporated
into the development, where possible
integrating drainage within landscape,
green networks and open space;
Pre and post development calculations
to indicate surface water drainage
requirements, including storage;
Demonstration that the level of treatment
and the available treatment for SUDS is
adequate;
Soil classification for the site;
Subsoil porosity test including the location
of suitable drainage and/or infiltration
devices;
Assessment of flood risk, if required; and,
Maintenance arrangements.
Further advice and guidance is contained
within the Council’s Drainage and Flood
Assessment Advice Note.

Page 45

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   45
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Flood Risk Assessments
Avoidance is the first principle of sustainable flood management. New development requires
to avoid areas susceptible to flooding and developers will be required to demonstrate
promotion of sustainable flood risk management measures.
Identifying and quantifying the source of
flooding taking into account the effects of
climate change;
Assess the level of risk of flooding arising
from and to the proposed development;
Demonstrate that the proposed
development is compatible with the risk
of flooding;
Provide a description of measures to
protect against or manage flood risk
ensuring any loss of flood storage capacity
is mitigated to achieve a neutral or better
outcome;
Indicate how surface water discharge is to
be managed in terms of flood risk;
Include acceptable measures to mitigate
against the potential effects of flooding on
and off the site arising from the proposal;
Demonstrate that the proposal will
not have an adverse impact on a flood
prevention scheme; and,
Specify and assess maintenance
implications.
Development proposals in areas of flood risk will be subject to sustainable
flood risk management measures being incorporated into the development and
compliance with Scottish Government Policy’s Flood Risk Framework and SEPA
guidelines, with an assessment setting out the following:

Page 46

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  46
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Design and Access Statements
Design requires to be considered as an
integral part of development proposals.
Developments requires to be designed
in relation to the specifications and
requirements of the site as well as the
character and amenity of the surrounding
area. All development requires to be
inclusive and be able to be used and
accessed by everyone.
Certain applications for planning permission
require to be accompanied by a statement
explaining:
The design principles and concepts that
have been applied; and
How issues relating to access to the
development have been dealt with.
Environmental Impact Assessment
This is an assessment of the likely
significant environmental effects arising
from a development. An Environmental
Impact Assessment (EIA) sets out
mechanisms for reducing, avoiding or
offsetting any potential adverse impacts.
The majority of planning applications do not
require an EIA and for those developments that
do, the overall planning application process
remains largely unchanged.
Some types of development automatically
require an EIA, development falling within
a description in Schedule 1 as outlined
in the Environmental Impact Assessment
(Scotland) Regulations 2011. These tend
to be larger developments which are likely
to have significant environmental effects.
Developments of a type that are listed in
Schedule 2 of the 2011 EA Regulations will
require an EIA if it is likely to have a significant
effect on the environment, by virtue of factors
such as its size, nature or location. Further
detailed guidance is provided in Planning
Circular 3/2011: The Town and Country
Planning (Environmental Impact Assessment)
(Scotland) Regulations 2011.
Site Investigations
The responsibility for the safe development
of a site rests with the developer. Site
investigations may be required to identify
potential contamination, noise and/or air
quality issues.
To ensure that the land and site is suitable
for the intended use or development, an
assessment requires to set out the following
information:
Identification of the source(s) of any
potential impact;
Details of the likely requirements for
remediation or mechanisms for reducing,
avoiding or offsetting any potential
adverse impacts; and,
Details of monitoring and evaluation of
remedial measures.
Further advice and guidance is contained
within the Council’s Contaminated Land
Guidance.

Page 47

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   47
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Noise Assessments
The structure and content of a
noise assessment report requires
to include the following:
A description of the site and
proposal;
Set out the agreed criteria for
assessment;
Details of noise measure surveys
undertaken, data summary and
additional calculations;
Details of the techniques and
equipment used in measurement;
Details of the noise source and
receptors;
An impact assessment; and,
Noise mitigation measures,
implementation and monitoring.
Air Quality Assessments
An Air Quality Assessment requires to consider the
following:
Existing air quality in the study area (base year);
Predict the future air quality without the proposed
development in place (future base year);
Future air quality with the development in place;
and,
Measures required to mitigate the potential impact
on air quality.
There is a wide range of assessment methods available
for air quality assessment. The Local Air Quality
Management Technical Guidance (TG0916) and the
Land-Use Planning and Development Control: Planning
for Air Quality (January 2017) requires to be considered
when determining the assessment methodology.
The proposed assessment methodology and datasets
should be agreed with the Council prior to the
commencement of the assessment.
Consideration of the Renfrewshire Council’s Air Quality
Action Plan 2 and the Air Quality Management Areas
within Renfrewshire must be taken into account when
undertaking an Assessment.

Page 48

Renfrewshire Local Development – New Development Supplementary Guidance 2022  |  48
APPENDIX 1 – ADDITIONAL INFORMATION FOR ASSESSMENT   - DEVELOPMENT GUIDANCE
Ecological Appraisal
An ecological appraisal is required to determine the likely ecological
constraints associated with a development, and to establish the
potential scope of any further, more detailed ecological survey
needed to underpin any mitigation strategy required.
An Ecological Appraisal contains a ‘phase 1 habitat survey’ which aims to
identify and map any habitats present within an area.
The survey will determine the need for further investigation and to
understand the impact of a development on an area. 
An ecological appraisal requires to  provide:
A description of the habitats present;
Pre-existing desk study data for the Site;
An overview of the relevant legislation and policy afforded to the
habitats and species present (or likely present);
An assessment of the potential of the Site to support protected
species and species of conservation concern;
The identification of any key ecological constraints and opportunities;
and
The likely requirement for any further survey work to inform the
mitigation, compensation and enhancement measures required to
address legislative requirements.
Landscape and Visual Assessment
A Landscape and Visual Appraisal provides the baseline against
which the effects of a proposed development, on the landscape of
the site and its context, are assessed.
The design of the proposed development and the identification of mitigation
measures to minimise adverse effects must be informed by a landscape
and visual assessment. During the appraisal, effects on features identified
as important to the scenic quality, or effects on the landscape character of
the site and its setting are assessed.
An assessment requires to:
Describe and evaluate the landscape of the site and surrounding
landscape context and visual amenity of the surrounding area;
Examine the development proposals and analyse the potential effects
on the landscape and visual amenity; and
Provide an assessment of the landscape and visual effects of the
proposed development with integral mitigation measures in place.
The methodology used for assessing the landscape and visual effects
should be based on recommendations in Guidelines for Landscape and
Visual Appraisal 3rd Edition published by The Landscape Institute and the
Institute of Environmental Management & Assessment in 2013.

Page 49

Renfrewshire Local Development – New Development Supplementary Guidance 2022   |   49

Page 50

This publication can be made available in Braille, large print or audio.
If you would like information in another language please ask us.
T:  0300 300 0144
E:  localplanconsultation@renfrewshire.gov.uk
R
enfrewshire Local D
evelopment P
lan
New Development Supplementary Guidance 2022