Page 1

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   23/0019/LB
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley North
West 
Applicant: Lark Gas
Assets Ltd 
Registered: 
19/01/2023 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of battery energy
storage system 
LOCATION: Former Gasholder Station at Junction with
Underwood Road, Well Street, Paisley 
APPLICATION FOR: Listed Building Consent 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The proposed development accords with the
relevant policies within National Planning
Framework 4, the adopted Renfrewshire Local
Development Plan 2021, and the relevant historic
environment policies and guidance. 
 There have been no objections from consultees. 
 There have been no representations.
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 23/0019/LB 
SITE ADDRESS  Former Gasholder Station at Junction with Underwood Road,
Well Street, Paisley
PROPOSAL  Erection of battery energy storage system
RECOMMENDATION Grant subject to conditions
 
PROPOSALS This application seeks listed building consent for the installation of a
battery energy storage system on the site of a former gas distribution
station at Underwood Road, Paisley. 
The site is bound by Well Street to the north with industrial units
beyond, the B775 Underwood Road to the east, the Glasgow-Gourock
railway line to the south with residential properties beyond, and airport
car parking to the west. 
Boundary treatment comprises of a 2m high stone wall along the Well
Street and Underwood Road frontages, with a palisade fence to the
south and west. 
The site is currently occupied by a redundant gasholder frame which
is A listed. The listing states that this is the oldest surviving column
gasholder in Scotland. It is noted as being a local landmark, and a
reminder of an industrial process that is now redundant. 
The proposed energy storage system comprises of 28 battery storage
containers which will be positioned within the footprint of the
gasholder frame. The containers are 2.98m in height. Seven
transformer units and fourteen component containers (all 2.72m in
height) will be grouped in the southwestern corner of the site, with the
control room (3.25m in height), substation (3.79m in height) and other
storage buildings grouped at the northwestern corner adjacent to the
access from Well Street. This area also includes parking for vehicles. 
The existing boundary walls and the trees along the southeastern
boundary will be retained. There is a requirement for a 3.5m acoustic
fence along the western boundary. Internal fencing will separate the
batteries from the control room and substation. 
SITE HISTORY Application No: 23/0018/PP
Description: Erection of battery energy storage system
Status: Concurrent application pending consideration 
Application No: 22/0358/PN
Description: Development of a battery energy storage system.
Status: Accepted. 
Application No: 22/0337/EA
Description: Request for screening opinion as to the requirement for
an Environmental Impact Assessment relating to the development of a

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
battery energy storage system
Status: Environmental Assessment not Required. 
Application No: 19/0553/LB
Description: Removal of gasholder lifts and shell, and associated gas
infrastructure and infilling of the tank to existing ground level, together
with associated removals and works
Status: Granted. 
Application No: 18/0330/PP
Description: Erection of kiosk and 2.4m palisade security fence
Status: Granted 
Application No: 17/0640/PP
Description: Installation of a gas powered electricity generation plant
and containerised electricity storage facility with associated security
columns, gate, and fence.
Status: Granted subject to conditions. 
CONSULTATIONS Historic Environment Scotland – No objections. Advise that
discussions should be undertaken to help secure the ongoing
maintenance of the gasholder frame. 
Paisley West and Central Community Council – Concern raised
over ongoing maintenance of the gasholder frame and recommend
that a condition be applied to ensure a maintenance plan is in place,
and that maintenance of the gasholder frame is undertaken prior to
the development being installed. 
Ferguslie Community Council – Reiterate the comments made by
Paisley West and Central Community Council regarding the
requirement for a condition to secure the maintenance of the
gasholder frame. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Development Plan 
NPF4: Policy 7 - Historic assets and places 
Renfrewshire Local Development Plan (2021)
LDP 2021 Policy ENV3 - Built and Cultural Heritage 
Supplementary Guidance
Delivering the Environment Strategy 
Material Considerations
Historic Environment Scotland Policy Statement
Historic Environment Circular
Historic Environment Scotland's Managing Change in the Historic
Environment Guidance Notes

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
 
LISTED BUILDING 
ASSESSMENT
The Town and Country Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 states that in considering whether to grant
listed building consent for any works, special regard must be had to
the desirability of preserving the listed building or its setting, or any
features of special architectural or historic merit. 
The national and local policy guidance comprises the Historic
Environment Policy Statement which advises that planning authorities
must consider the statement itself, Scottish Planning Policy, the
Historic Environment Circular and Historic Environment Scotland's
Managing Change in the Historic Environment Guidance Note series.
These documents set out the key principles which apply in the
assessment of the applications for listed building consent. 
In terms of development plan policy, Policy 7 within National
Planning Framework 4, Policy ENV3 within the Renfrewshire Local
Development Plan (2021), and the associated Supplementary
Guidance on Delivering the Environment Strategy seek to protect
and enhance the listed building. Development proposals relating to
listed buildings are required to meet various criteria including the use
of sympathetic and appropriate materials and finishes, and that the
massing, scale, and form of development should be appropriate. 
The applicant has amended the layout of the scheme to comply with
pre-application advice from Historic Environment Scotland. The layout
presented at the pre application stage showed the battery storage
units within the frame of the gasholder. However, the transformer units
were arranged in a circle on the outside edge of the gasholder frame.
The layout was thereafter amended to group the transformer units in
the south western corner of the site and away from the perimeter of
the gasholder frame. The area around the gasholder frame is now
more open in this regard, and the proposed infrastructure does not
compromise its setting or block any external views of the gasholder.
The setting of the A listed gasholder frame will therefore be suitably
protected in compliance with Policy 7.   
Historic Environment Scotland (HES) have offered no objection to the
development. HES, Ferguslie Community Council and Paisley West
and Central Community Council have all raised the matter of the
ongoing maintenance of the gasholder frame. 
The applicant has advised that the condition of the frame was last
surveyed in 2017, and that some patches of corrosion were noted at
that time. 
The applicant has confirmed that a maintenance plan for the frame will
be prepared which updates the previous 2017 survey to identify
current maintenance requirements, the methodology and timetable for
the maintenance works, and a review mechanism for future
maintenance.

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
It is considered that the maintenance plan can be agreed as a
condition of the listed building consent, and that the implementation of
a maintenance plan will address the matters raised by HES and the
Community Councils. 
The Heritage Statement submitted by the applicants also highlights
the requirement for protective measures to be put in place to protect
the gasholder frame during the construction phase. This could include
temporary protective cladding. A method statement which details
measures to protect the gasholder frame during the construction
phase can be submitted via condition. 
It is noted that no ground breaking works are required, with the
component infrastructure elevated on concrete plinths. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. It is therefore recommended that listed
building consent is granted subject to conditions. 
RECOMMENDATION Grant subject to conditions. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority a maintenance strategy for the gasholder
frame. The strategy shall detail the condition of the frame and identify any current
maintenance requirements, a methodology and timetable for undertaking the maintenance
works, and a timetable detailing the ongoing survey and maintenance of the frame for the
period that the battery energy storage facility is operational. The approved maintenance
strategy shall thereafter be implemented on site, with all maintenance work and ongoing
survey work undertaken in accordance with the agreed timetables. 
Reason: To ensure that gasholder frame is maintained in the interests of safeguarding built
heritage assets.       
2. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority a method statement detailing all measures
required to protect the gasholder frame during the construction phase. The measures
within the approved method statement shall thereafter be implemented on site prior to the
construction phase commencing and shall remain in place for the duration of the
construction phase. 
Reason: To ensure the gasholder frame is protected during the construction phase in the
interests of safeguarding built heritage assets.

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666