Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   23/0018/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley North
West 
Applicant: Lark Gas
Assets Ltd 
Registered: 
19/01/2023 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of a battery energy
storage system. 
LOCATION: Former Gasholder Station at Junction with
Underwood Road, Well Street, Paisley 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The proposed development accords with the
relevant policies within National Planning
Framework 4 and the adopted Renfrewshire Local
Development Plan 2021. 
 There have been no objections from consultees. 
 There have been no representations.
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 23/0018/PP 
SITE ADDRESS  Former Gasholder Station at Junction with Underwood Road, Well
Street, Paisley 
PROPOSAL  Erection of a battery energy storage system.
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks planning permission for the installation of a
battery energy storage system on the site of a former gas distribution
station at Underwood Road, Paisley. 
The site is bound by Well Street to the north with industrial units
beyond, the B775 Underwood Road to the east, the Glasgow-Gourock
railway line to the south with residential properties beyond, and airport
car parking to the west. 
Boundary treatment comprises of a 2m high stone wall along the Well
Street and Underwood Road frontages, with a palisade fence to the
south and west. The site is currently occupied by a redundant gas
holder frame which is A listed. 
The proposed energy storage system comprises of 28 battery storage
containers which will be positioned within the footprint of the
gasholder frame. The containers are 2.98m in height. Seven
transformer units and fourteen component containers (all 2.72m in
height) will be grouped in the southwestern corner of the site, with the
control room (3.25m in height), substation (3.79m in height) and other
storage buildings grouped at the northwestern corner adjacent to the
access from Well Street. This area also includes parking for vehicles. 
The existing boundary walls and the trees along the southeastern
boundary will be retained. There is a requirement for a 3.5m acoustic
fence along the western boundary. Internal fencing will separate the
batteries from the control room and substation. 
When fully charged the proposed battery storage system will be able
to store up to 49.5MW of power which is equivalent to the demand
from up to 10,000 homes over a two hour period. As the maximum
generation capacity is in excess of 20MW the proposal is classed as a
‘major’ development.   
SITE HISTORY Application No: 23/0019/LB
Description: Erection of battery energy storage system
Status: Concurrent application pending consideration 
Application No: 22/0358/PN
Description: Development of a battery energy storage system.
Status: Accepted. 
Application No: 22/0337/EA

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
Description: Request for screening opinion as to the requirement for
an Environmental Impact Assessment relating to the development of a
battery energy storage system
Status: Environmental Assessment not Required. 
Application No: 19/0553/LB
Description: Removal of gasholder lifts and shell, and associated gas
infrastructure and infilling of the tank to existing ground level, together
with associated removals and works
Status: Granted. 
Application No: 18/0330/PP
Description: Erection of kiosk and 2.4m palisade security fence
Status: Granted 
Application No: 17/0640/PP
Description: Installation of a gas powered electricity generation plant
and containerised electricity storage facility with associated security
columns, gate, and fence.
Status: Granted subject to conditions. 
CONSULTATIONS Health and Safety Executive – Do Not Advise Against. 
Communities & Housing Services (Environmental Protection
Team) – No objection subject to conditions relating to noise. 
Chief Executive’s Service (Roads Development) – No objections
subject to conditions regarding the upgrade of the main access to
accord with the requirements of the National Roads Development
Guide, and submission of a construction traffic management plan. 
Glasgow Airport Safeguarding – No objections. Informative required
regarding the use of cranes. 
Network Rail – No objections. 
Historic Environment Scotland – No objections. Advise that
discussions should be undertaken to help secure the ongoing
maintenance of the gasholder frame. 
Paisley West and Central Community Council – Concern raised
over ongoing maintenance of the gasholder frame and recommend
that a condition be applied to ensure a maintenance plan is in place,
and that maintenance of the gasholder frame is undertaken prior to
the development being installed. 
Ferguslie Community Council – Reiterate the comments made by
Paisley West and Central Community Council regarding the

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
requirement for a condition to secure the maintenance of the
gasholder frame. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan 
NPF4: Policy 1 - Tackling the climate and nature crises
NPF4: Policy 2 - Climate mitigation and adaptation
NPF4: Policy 7 - Historic assets and places
NPF4: Policy 9 - Brownfield, vacant and derelict land and empty
buildings
NPF4: Policy 11 – Energy 
Renfrewshire Local Development Plan (2021)
LDP 2021: Policy E3 - Transition Areas
LDP 2021: Policy I4 - Renewable and Low Carbon Energy
Developments
LDP 2021: Policy ENV3 - Built and Cultural Heritage 
New Development Supplementary Guidance 
Delivering the Economic Strategy
Delivering the Environment Strategy
Delivering the Infrastructure Strategy
 
ENVIRONMENTAL
ASSESSMENT
The proposed development has been screened against The Town and
Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017 to determine whether an Environmental Impact
Assessment is required (see application 22/0377/EA). It is not
considered that an Environmental Impact Assessment is required
given the characteristics of the development and its location. 
PLANNING
ASSESSMENT
In considering the development plan, National Planning Framework
4 (NPF4) sets out the most up to date policy position. 
The proposed development will support the decarbonisation of the
electricity grid and the associated reduction in fossil fuel based energy
generation. Renewable energy generation is intermittent. However,
the development will store surplus energy at times of high energy
generation and low demand. The stored energy can then be
distributed into the grid at times of low generation and high demand.
The development will therefore contribute to tackling the climate crisis
and climate mitigation as required by Policy 1 and 2. 
Policy 11 supports energy storage proposals in principle. In this

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
instance, given the site’s location, design and layout it is not
considered that the proposed development would give rise to any
significant impact on residential properties, visual amenity, public
access, aviation, telecommunications, road traffic, hydrology,
biodiversity, or trees. 
The applicant has amended the layout of the scheme to comply with
pre-application advice from Historic Environment Scotland. The layout
presented at the pre application stage showed the battery storage
units within the frame of the gasholder. However, the transformer units
were arranged in a circle on the outside edge of the gasholder frame.
The layout was thereafter amended to group the transformer units in
the south western corner of the site and away from the perimeter of
the gasholder frame. The area around the gasholder frame is now
more open in this regard, and the proposed infrastructure does not
compromise its setting or block any external views of the gasholder.
The setting of the A listed gasholder frame will therefore be suitably
protected in compliance with Policy 7.   
The proposal will result in the sustainable redevelopment of a
brownfield site in compliance with Policy 9. 
It is considered that the development accords with NPF4. 
In relation to the relevant policies in the Renfrewshire Local
Development Plan (2021), the application site falls within the
Underwood Road Transition Area. 
Policy E3 states that transition areas aim to support a mix of uses.
Development proposals within transition areas require to be able to
co-exist with existing uses, having no significant effect on the
character and amenity of the surrounding area. 
It is noted that the principle of energy generation at this site has
already been accepted through the approval of application
17/0640/PP. The proposed development is similar in character to this
previous consented use. However, the associated noise, air quality
and visual impacts are less pronounced. 
The development will facilitate the re-use of this vacant site. The
challenges associated with re-using this site whilst retaining the
gasholder frame should be noted. Energy generating uses are
considered to be a viable and appropriate way of ensuring the site is
re-used and the gasholder frame is retained. 
The infrastructure associated with the development will be
predominantly screened by the existing boundary wall and the trees
along the south eastern boundary. The development will not have a
significant impact on the visual amenity of the area. 
There will be no adverse impact on neighbouring properties in terms
of use, scale, disturbance, or air quality. An acoustic barrier is

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
proposed along the western boundary to mitigate any noise impact.
This barrier is between the site and the airport parking to the west will
not be readily visible from external locations. There have been no
objections from the Environmental Protection team. 
It is not anticipated that the development will have a significant
adverse impact on local infrastructure, and traffic generated by the
development is minimal. There is also good accessibility to a range of
sustainable travel modes. There have been no objections from Roads
Development. 
There will be no adverse impact on the natural environment, and the
applicant has confirmed that all existing trees on the site will be
retained. 
In view of the above I am satisfied that the development complies with
Policy E3.   
Policy ENV3 requires the setting of listed buildings to be protected.
Historic Environment Scotland (HES) have offered no objection to the
development. They note that the layout of the site has been amended
to accord with their pre-application advice and have offered no
objection to the development. 
HES, Ferguslie Community Council and Paisley West and Central
Community Council have all raised the matter of the ongoing
maintenance of the gasholder frame. 
The applicant has advised that the condition of the frame was last
surveyed in 2017, and that some patches of corrosion were noted at
that time. 
The applicant has confirmed that a maintenance plan for the frame will
be prepared which updates the previous 2017 survey to identify
current maintenance requirements, the methodology and timetable for
the maintenance works, and a review mechanism for future
maintenance. 
It is considered that the maintenance plan can be agreed as a
condition of the planning permission, and that the implementation of a
maintenance plan will address the matters raised by HES and the
Community Councils. It should be noted that HES and the Community
Councils have not objected to the principle of the development. 
In view of the above I am satisfied that the development complies with
Policy ENV3. 
Policy I4 states that development proposals associated with
renewable and low carbon energy, and the recovery of energy that
would otherwise be lost, will be supported in principle. 
The majority of the assessment criteria within Policy I4 and the

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
associated development guidance on Delivering the Infrastructure
Strategy have been considered above. 
Of the criteria that have not been assessed the development will not
have a detrimental impact on any outdoor sports or recreational
interests. 
Glasgow Airport Safeguarding have offered no objections with respect
to the safe and efficient use of Glasgow Airport. 
As the development does not have a significant impact on visual
amenity it is not considered necessary to place any restrictions or
controls on the duration of the planning permission. However, it is
considered that should the site no longer be used to store energy for a
period of a year that the site should be restored to an appropriate
condition and a planning condition can be imposed to control this
matter. 
The development does not give rise to any cumulative impact with
respect to any other similar existing or approved developments in the
area. 
In view of the above I am satisfied that the development complies with
Policy I4. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. It is therefore recommended that
planning permission be granted subject to conditions. 
RECOMMENDATION Grant subject to conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That the battery energy storage facility hereby approved shall operate at all times in
accordance with the recommendations set out within the Outline Battery Safety
Management Plan from Private Energy Partners dated March 2023. 
Reason: To ensure the safe operation of the facility in the interests of amenity. 
2. That prior to the battery energy storage facility hereby approved becoming operational,
the 3.5 m acoustic barrier as specified in the Noise Impact Assessment from ITPEnergised
dated 2022-12-07 shall be installed at the site. The acoustic barrier shall thereafter be
maintained at the site for the duration that the facility is operational.

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
Reason: To ensure noise impact is mitigated in the interests of residential amenity. 
3. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority a maintenance strategy for the gasholder
frame. The strategy shall detail the condition of the frame and identify any current
maintenance requirements, a methodology and timetable for undertaking the maintenance
works, and a timetable detailing the ongoing survey and maintenance of the frame for the
period that the battery energy storage facility is operational. The approved maintenance
strategy shall thereafter be implemented on site, with all maintenance work and ongoing
survey work undertaken in accordance with the agreed timetables. 
Reason: To ensure that gasholder frame is maintained in the interests of safeguarding built
heritage assets.       
4. That prior to the commencement of development on site, the developer shall submit
specification and plan detailing the measures to be implemented on site to ensure all
existing trees are protected during the construction phase. The protection measures shall
accord with the recommendations set out within BS5837: 2012 Trees in Relation to Design,
Demolition and Construction. All protection measures shall thereafter be implemented on
site prior to construction works commencing and shall be maintained on site for the
duration of the construction phase. 
If any trees require to be removed to accommodate the development, the specification and
plan shall include details of compensatory planting to be undertaken to ensure that any
trees that are felled are replaced by trees of a similar species. The specification and plan
shall detail the locations of the replacement planting, and the size and species of tree to be
planted. The approved replacement trees shall thereafter be planted in the approved
location within the next planting season (October to March inclusive) following completion
of the development hereby approved. If the replacement trees die, become diseased or
uprooted within 5 years of being planted they shall be replaced within the next planting
season.     
Reason: To ensure existing trees are protected in the interests of safeguarding natural
heritage assets. 
5. The design, installation and operation of any plant, machinery or equipment associated
with the operation of the battery energy storage facility shall be such that noise associated
with the development does not exceed Noise Rating Curve NR25 between the hours of
2300 to 0700 hours and NR 35 at all other times, when measured within any dwelling in the
vicinity of the development. Structure borne vibration from the proposed development shall
be imperceptible within any dwelling in the vicinity of the development. For an explanation
of noise rating curves, refer to BS 8233:2014 Sound insulation and noise reduction in
buildings- code of practice, Annex B. 
Reason: To ensure noise impact is mitigated in the interests of residential amenity. 
6. That prior to the commencement of development on site, the developer shall submit a
plan for the written approval of the Planning Authority detailing the upgrading of the access
onto Well Street in accordance with the requirements of the National Road’s Development
Guide. This shall include (but shall not be limited to) resurfacing the access from the edge
of the carriageway into the site for a distance of 5m, and the provision of drainage to
ensure no surface water discharges onto the public road. The plan shall also include a

Page 9

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
timetable setting out when the upgrade works will take place. The upgrade works shall
thereafter be undertaken in accordance with the approved timetable. 
Reason: To ensure the site is accessed safely. 
7. That prior to the commencement of development on site, the developer shall submit a
Construction Traffic Management Plan (CTMP) for the written approval of the Planning
Authority. The CTMP shall detail the impact of the construction phase on the local road
network. This shall include (but shall not limited to) duration of the construction phase, the
method by which components will be delivered to the site, frequency and timing of
deliveries, requirement for temporary signage, and provision for temporary car parking
within the site boundary. The CTMP shall also include measures to minimise disruption to
the local road network during the construction phase. The construction phase shall
thereafter be undertaken in accordance with the approved CTMP. 
Reason: To minimise disruption to the local road network during the construction phase. 
8. If any battery storage unit hereby approved fails to generate an electricity supply to the
grid for a continuous period of 12 months then, unless otherwise agreed in writing by the
Planning Authority, the battery storage unit and any associated above ground infrastructure
solely required for that unit shall be dismantled and removed from the site and the area
around the unit restored in accordance with a scheme to be submitted to and approved in
writing by the Planning Authority. 
Reason: To ensure that any redundant battery storage units are removed from site, in the
interests of safety, amenity and environmental protection   
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666