Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0837/PP
 
Agenda Item (C ) 
KEY  INFORMATION 
Ward: Ward 1 –
Renfrew North and
Braehead 
Applicant:
Renfrewshire Council 
Registered: 
13 December 2022 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Formation of HGV layby and
extension to car park with associated access, gates, and
fencing. 
LOCATION: 4 Argyll Avenue, Renfrew, PA4 9EB 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The proposed development complies with the
Development Plan including Policy 18 & 26 of
National Planning Framework 4 and Policy E2 and
E3 of the Adopted Renfrewshire Local Development
Plan. 
 There have been no representations. 
 There have been no objections from consultees.
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 22/0837/PP 
SITE ADDRESS  4 Argyll Avenue, Renfrew, PA4 9EB
PROPOSAL  Formation of HGV layby and extension to car park with associated
access, gates, and fencing. 
RECOMMENDATION Grant subject to conditions
 
PROPOSALS This application seeks planning permission for the formation of a HGV
layby and extension to an existing car park with associated access,
gates and fencing at the Diageo premises on Argyll Avenue, Renfrew. 
The proposal is associated with the delivery of the Clyde Waterfront
and Renfrew Riverside (CWRR) project. As part of this project Argyll
Avenue will be upgraded to form part of the Renfrew North
Development Road. 
At present Argyll Avenue terminates at the northern end of the Diageo
premises, and there is no through flow of traffic on the road where it
fronts the Diageo site. Diageo undertake security checks on vehicles
entering the site, currently while one vehicle is being checked any
second vehicle arriving can park on Argyll Avenue without impeding
traffic. When Argyll Avenue is upgraded HGV’s will no longer be able
to park on the road as the aim is to enhance the network along the
new north development road.   
The layby is therefore proposed to accommodate HGVs outside the
Diageo site with the ability to park up in the lay by and off the main
carriageway to await controlled entry to the premises. 
The layby will be located on the grass verge and area of staff car
parking fronting Argyll Avenue. It incorporates a vehicle barrier that
will be controlled via an intercom. The footway will be maintained
along the eastern side of the layby. A new palisade fence and gates
will be erected along the boundary between the Diageo facility and the
new layby. 
The application also includes an expanded area for staff parking at the
southern edge of the Diageo site to compensate for the area that will
be lost in the formation of the layby.         
This report relates to an application that would normally fall within the
Council's scheme of delegation to be determined by an appointed
officer. However, a request has been submitted by three members,
within 21 days of the application appearing on the weekly list, that the
matter be removed from the scheme of delegation for determination
by the Board. It was considered that the potential impact of the
development on the local community and local environment required it
to be fully considered prior to any decision being made.

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
SITE HISTORY Application No: 17/0486/PP
Description: The Clyde Waterfront and Renfrew Riverside Project
(CWRR) for the construction of an opening bridge across the Rover
Clyde, the construction of the Renfrew North Development Road, new
and improved cycling and walking infrastructure and associated
landscaping
Decision: Grant subject to conditions 
Application No: 17/0213/NO
Description: Construction of opening bridge and associated roads and
cycleways.
Decision: Accepted 
Application No: 13/0298/HZ
Description: Storage of Ethanol (Alcohol) 71 B6 Flammable (115,500
Tonnes) and Ethanol (Alcohol) 71 B8 Highly Flammable (1,037
Tonnes).
Decision: Grant subject to conditions 
Application No: 11/0141/PP
Description: Erection of single storey extension to process building 
Decision: Grant subject to conditions 
Application No: 08/0213/PP
Description: Formation of new external doorway and installation of
roller shutter
Decision: Grant subject to conditions 
CONSULTATIONS Health and Safety Executive – Do not advise against. 
Communities & Housing Services (Environmental Protection
Team) – No comments. 
Chief Executive’s Service (Roads Development) – clarification
sought on detail of proposal. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
National Planning Framework 4 (2023)
Policy 18 – Infrastructure first
Policy 26 – Business and Industry 
Renfrewshire Local Development Plan (2021)
Policy E2 – City Deal investment Framework
Policy E3 – Transition Areas
Policy I1 – Connecting Places
Policy P5 – Green/Blue Network 
New Development Supplementary Guidance (2021)

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
Delivering the Economic Strategy
Delivering the Infrastructure Strategy
Delivering the Places Strategy 
Material considerations
Planning legislation requires that planning decisions are made in
accordance with the Development Plan unless material considerations
indicate otherwise. In this case the proposal shall require to be
assessed against the policies and guidance set out above, the history
of the site, the comments of the consultees and any objections
received. 
PLANNING
ASSESSMENT
In considering the development plan, National Planning Framework
4 (NPF4) sets out the most up to date policy position. 
The proposed development is considered to be a necessary
component of the CWRR infrastructure project. It will also safeguard
the operations of the Diageo facility. Policy 18 and Policy 26 state
that proposals which contribute to infrastructure in line with that
identified as necessary within the local development plan will be
supported. It is considered that the development accords with NPF4. 
In relation to the relevant policies in the Renfrewshire Local
Development Plan (2021), Policy E2 states that the delivery of
Renfrewshire’s City Deal infrastructure projects and associated
development proposals will be supported to ensure the anticipated
economic benefits are fully realised. 
The proposed development is connected with the delivery of the
CWRR infrastructure project. It is acknowledged that HGV’s currently
park on Argyll Avenue whilst they are waiting to enter the Diageo site,
and that this does not impede traffic. However, it is also recognised
that this practice cannot be sustained once Argyll Avenue is upgraded
as part of the CWRR works. 
The proposed development will therefore ensure the existing
operation of the Diageo facility can be maintained without detriment to
the flow of traffic along the new Renfrew North Development Road.
HGV’s will be able to park up in a dedicated lay-by away from the
main carriageway and will not impede traffic flows in this regard.
Comments made by Roads regarding accidental use of the layby by
other road users is noted. However, the barrier is controlled 24hours a
day by intercom and this would be lifted should that happen. In
addition, a planning condition can be imposed requiring the
submission of details in respect of advisory signage. 
It is considered that the development complies with Policy E2 as it will
support the existing business whilst also contributing towards the
effective delivery of the CWRR project. 
Policy E3 states that Transition Areas aim to support a mix of uses.
Development proposals within Transition Areas require to be able to

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
co-exist with existing uses, having no significant effect on the
character or amenity of the surrounding area. 
The proposed development will support the operation of an
established use within the Transition Area. Additionally, it will allow for
the effective implementation of the CWRR project which will improve
the infrastructure within the Transition Area making it more attractive
to future investment. 
It is not considered that the development will have a detrimental
impact on the character or amenity of the area. The proposed
palisade boundary treatment is commensurate with existing
boundaries at the site. The compensatory staff parking area to the
south has already been formed and is hidden by the boundary wall.
The additional plant to the north is again commensurate with the
appearance of the site. 
The development complies with Policy E3. 
Policy I1 states that all development proposals require to ensure
appropriate provision and accessibility including the ability to connect
to active travel and public transport networks. Proposals which give
priority to sustainable modes of travel and have no significant impact
on the safe and efficient operation of the local road network will be
supported. It should also be noted that Argyll Avenue is designated as
a core path with regard to Policy P5 which seeks to ensure that these
are protected, maintained, and enhanced. 
The primary purpose of the development is to ensure the safe and
efficient operation of the road network. The shared use cycle and
pedestrian path will be delivered as part of the associated larger
CWRR project in accordance with details already granted planning
consent in relation to the CWRR project. 
The proposal complies with the Development plan and there are no
other material considerations. It is therefore recommended that
planning permission is granted. 
RECOMMENDATION Grant subject to conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That the HGV lay by and associated realigned footway shall be formed on site in
accordance with approved drawing R08-JAC-ZZ-DR-KK-006 P0 (and any
subsequent approved amendments to this drawing) and maintained thereafter to

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
the satisfaction of the Council as Planning Authority. 
Reason: To ensure the development is implemented in accordance with the
approved plans. 
2. That prior to the operation of the lay by, details of the location and design of all
directional/advisory signage and road markings shall be submitted for the written
approval of the Council as Planning Authority. Thereafter the approved signage and
road markings shall be installed and maintained at the site to the satisfaction of the
Council. 
Reason: To ensure control is retained over any directional signage or road
markings installed and visual amenity and road safety is protected.