Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0363/PP 
KEY  INFORMATION 
Ward: Ward 4 – Paisley
NorthWest 
Applicant:
Renfrewshire Council 
Registered: 23.05.2022 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Formation of 2 lane road,
including a bridge crossing over the White Cart Water, road
and footpath upgrades and other associated works. 
LOCATION: Site Linking Inchinnan Road and Harbour Road
With Abercorn Street, Paisley 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The proposed development complies with policies
E1, E2, E3, P1, P5, I1, I3, ENV2, ENV4 and ENV5
of the Adopted Local Development Plan and the
associated guidance on delivering the Economic,
Places, Infrastructure and Environment Strategies. 
 There have been no objections from consultees. 
 Two letters of representation have been received. 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0363/PP 
SITE ADDRESS  Site Linking Inchinnan Road and Harbour Road With Abercorn Street,
Paisley 
PROPOSAL  Formation of 2 lane road, including a bridge crossing over the White
Cart Water, road and footpath upgrades and other associated works. 
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks planning permission for the formation of a 2-
lane road, including a bridge crossing over the White Cart Water,
together with associated upgrades to existing roads. 
The development has been proposed primarily to improve access
between Paisley Town Centre and  the Advanced Manufacturing and
Innovation District (AMIDS) being developed next to Glasgow Airport.
The investment may also stimulate wider economic activity by
improving connectivity and linking other infrastructure investments
both within and to the north of Paisley town centre.   
The development comprises a north/south route of approx. 1.7km in
length, and an east/west route of approx. 550m in length. The routes
comprise a combination of new road and the upgrading of existing
roads 
The north/south route comprises of upgrades to Abercorn Street,
Harbour Road and Inchinnan Road, and a new road and river crossing
to connect Harbour Road with Inchinnan Road. The east/west route
comprises of a new road to connect Harbour Road with Renfrew
Road.   
SITE HISTORY Application No. 18/0482/PP
Description. Erection of business park development (in principle), to
include advanced manufacturing, research & development and
aviation services, comprising of: primarily Class 4 business, Class 5
general industrial, and Class 6 storage or distribution uses
Decision. Grant subject to conditions 
Application No. 17/0884/EO
Description. Erection of business park development with associated
car parking, access, land engineering and infrastructure work
Decision. Environmental Assessment not Required 
Application No. 17/0485/PP
Description. The realignment of Abbotsinch Road, the construction of
a bridge over the White Cart Water and the construction of cycleways,
associated landscaping, and ancillary infrastructure, and the stopping-
up of consequential redundant sections of roads, footpaths, and

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3 
accesses.
Decision. Grant subject to conditions.   
CONSULTATIONS West of Scotland Archaeology Service – No objection subject to
condition regarding the undertaking of archaeological investigations. 
Transport Scotland – No objections. 
SEPA – No objections.
Communities & Housing Services (Environmental Protection
Team) – No objections subject to conditions relating to ground
contamination, noise, and air quality. 
Glasgow Airport Safeguarding – No objection subject to conditions
relating to Bird Hazard Management and landscaping. 
NATS – No objections. 
NatureScot – No objections. 
REPRESENTATIONS  Two letters of representation have been received, both of which object
to the proposed development. The points raised in the letters can be
summarised as follows. 
1. Increase in traffic. 
2. Existing challenges for pedestrians and cyclists in terms of
movement and accessibility. 
3. Proposed route runs through an existing business operation. 
DEVELOPMENT PLAN
POLICIES
National Planning Framework 4 (Revised Draft – Nov 2022)
Renfrewshire Local Development Plan (2021) 
Policy E1 – Renfrewshire’s Economic Investment Locations
Policy E2 – City Deal Investment Framework
Policy E3 – Transition Areas
Policy P1 – Renfrewshire’s Places
Policy P5 – Green/Blue Network
Policy I1 – Connecting Places
Policy I3 – Flooding and Drainage
Policy ENV2 – Natural Heritage
Policy ENV4 – The Water Environment
Policy ENV5 – Air Quality 
New Development Supplementary Guidance (2021) 
Delivering the Economic Strategy

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4 
Delivering the Places Strategy
Delivering the Infrastructure Strategy
Delivering the Environment Strategy 
Material considerations 
Scottish Planning Policy 
Planning legislation requires that planning decisions are made in
accordance with the Development Plan unless material considerations
indicate otherwise. In this case the proposal shall require to be
assessed against the policies and guidance set out above, the history
of the site, the comments of the consultees and any objections
received. 
HABITATS
REGULATIONS
APPRAISAL AND
APPROPRIATE
ASSESSMENT
The proposed development has been the subject of a Habitats
Regulations Appraisal (HRA) and an Appropriate Assessment (AA)
both as part of the Local Development Plan and separately as part of
the supporting information associated with this application. 
For the purposes of this application, the HRA notes that the
development has the potential to impact the qualifying interest of the
Black Cart SPA and Inner Clyde SPA as these are downstream of the
development site. 
However, the AA concludes that this potential impact can be suitably
mitigated through the implementation of an environmental
management plan at the construction stage to control pollution and
sediment run off. The requirement for an environmental management
plan can be addressed through a planning condition. NatureScot have
been consulted on the above and have offered no objections to the
development.   
ENVIRONMENTAL
ASSESSMENT
Both planning permissions relating to the formation of AMIDS
(17/0485/PP for the Glasgow Airport Investment Area infrastructure
and 18/0482/PP for the business park) have been subject to
environmental assessment with respect to the provisions of The Town
and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. Application 17/0485/PP was accompanied by an
Environmental Impact Assessment, and it was determined that
application 18/0482/PP did not require an Environmental Impact
Assessment. 
For the purposes of this application, the proposal is a “schedule 2
development” as it comprises the construction of roads where the
area of the works exceeds 1 hectare. However, given the
characteristics of the development, the location of the development,
and the characteristics of the potential impact, it is not considered that
an Environmental Impact Assessment is required to support this
application. Environmental matters arising from the proposed
development can be fully addressed as part of the planning
assessment.

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5 
PLANNING
ASSESSMENT
The fourth National Planning Framework (NPF4) although not yet
formally adopted, was approved by Scottish Ministers on 11 January
2023. It provides the long-term national spatial strategy for planning in
Scotland. It sets out the Scottish Government’s current view on
delivering sustainable, liveable and productive places through the
application of spatial principles. NPF4 is considered to be a material
consideration and therefore applying these principles in practice is
relevant to the consideration of each proposal and as such each
application is being considered taking account of the overarching
spatial principles. It is considered that the proposal complies with the
overall focus of NPF4. 
Policy E2 provides a framework of investment for Renfrewshire’s City
Deal projects. The policy states that these investment projects as set
out in Figure 4 of the local development plan will be supported to
ensure the anticipated economic benefits are fully realised. 
Figure 4 highlights the Paisley North Regeneration Area as forming
part of this framework. The proposed development is located within
this regeneration area. 
All development proposals associated with the delivery of City Deal
investment will be considered in relation to the relevant Local
Development Plan policies and the new development supplementary
guidance.   
The proposed east/west link and the section of north/south link
covering Abercorn Street, Harbour Road and the new bridge crossing
are located within the Paisley Town Centre North Transition Area.
Policy E3 states that transition areas aim to support a mix of uses.
Development proposals within a transition area require to be able to
co-exist with existing uses, having no significant effect on the
character and amenity of the surrounding area. 
Figure 2 within the new development supplementary guidance lists
acceptable uses with the transition areas. The acceptable uses at
Paisley Town Centre North include opportunities to enhance access to
Glasgow Airport and AMIDS. 
As the proposed development will improve access to Glasgow Airport
and AMIDS, it is considered to comply with Policy E3 in principle. The
development must thereafter be assessed against the relevant
guidance on delivering the economic and spatial strategies. 
The proposed development is appropriate for the area. It is noted that
the development will not only enhance access to Glasgow Airport and
AMIDS but will also improve connectivity for existing businesses
within the area. The new road will also provide a framework for further
development in the area.

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6 
The development will enhance accessibility for pedestrians and
cyclists and will improve connections between Abercorn Street and
the public transport links on Renfrew Road. The development will also
make use of vacant land, and there is suitable provision for
landscaping which will enhance the local environment. 
The development increases the opportunity of bringing economic
benefit to the area by stimulating further investment in Paisley North
and AMIDS. Economic benefit will be stimulated without significant
environmental impact, and it is not anticipated that the surrounding
area will experience significant adverse effects with respect to noise
or air quality. However further consideration of these matters will be
addressed in detail below. 
Impact on local infrastructure, traffic generation and effect of
additional traffic     
The development is being funded through the UK Government
Levelling Up Fund and forms part of a wider package of proposed
works by the Council under the Glasgow City Region City Deal. The
planning application is supported by specimen design drawings for the
new bridge, active travel and road infrastructure. In addition to swept
path assessment and a transport assessment. 
The consulting team supporting the Council’s City Deal and
Infrastructure Team include Amey Consulting (roads, active travel,
drainage, utilities, lighting and electrical and environmental), Ramboll
(structural engineer, bridge and geotechnical design), Beam
(structural bridge architects), SYSTRA (Traffic consultant) and Sweco
(ecosystems services specialists). The project programme to realise
funding commitments requires the planning process and CPO
requirements to align. Thereafter, ground investigation works can be
carried out and the detailed design package can be formalised. It is
therefore considered appropriate that planning conditions are imposed
to control the final design of the project in consultation with the
Council’s Roads Team 
It is significant to note that the design drawings as submitted in
support of the planning application only concern the proposed road
and associated infrastructure.  
It is acknowledged that the former Chivas site is now within the
ownership of the Council and plans are progressing in relation to the
development of that site.  Should the development of the former
Chivas site require amendments to the road design this will be done
under a separate planning application pertaining to that site.   
It is not anticipated that the development will have an unacceptable
impact on the natural environment. Stretches of new road will be
constructed on previously developed land. It is acknowledged that
trees and other vegetation along the banks of the White Cart will be
removed to accommodate the new bridge crossing. However, the area
is not protected by any statutory designations, and there are areas of
landscaping identified where compensatory planting can be

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7 
undertaken. 
In view of the above, I am satisfied that the development complies
with the requirements of Policy E3. 
The most northerly section of the development site along Inchinnan
Road falls within policy E1 and P1 designations. Policy E1 relates to
economic investment locations, and the criteria for consideration are
the same as those noted above. Policy P1 states that development
proposals should be compatible with existing uses. 
Development proposals within this part of the site relate to the
upgrading of Inchinnan Road to form a shared footway/cycleway on
one side. These works are compatible with existing uses, will improve
accessibility for pedestrians and cyclists and will not have a
detrimental impact on character or amenity. 
It is noted that part of the proposed shared footway/cycleway will be
located within an area of green space on the eastern side of an office
block at Marchburn Drive. In order to facilitate the proposed active
travel route in this area, the trees in this area have been identified for
removal. In this regard an appropriate condition has been attached to
seek clarification on alternatives which result in the retention of the
trees.  Should the trees be removed, the condition also requires a
compensatory planting scheme to be agreed.   
In view of the above, I am satisfied that the development complies
with the requirements of policies E1 and P1. 
Policy I1 states that development proposals require to ensure
appropriate provision and accessibility to active travel and public
transport networks. Proposals which give priority to sustainable
modes of travel and have no significant impact on the safe and
efficient operation of the local and trunk road network will be
supported. 
The primary purpose of this development is to improve accessibility to
Glasgow Airport and AMIDS. Accessibility will be improved for all
modes of transport. 
Regarding the movement hierarchy, the development makes provision
for travel by walking and cycling. Along existing routes, the proposals
seek to enhance the environment for walking and cycling by delivering
a designated footway/cycleway. It is accepted that the developer must
work within the constraints of the existing built form in this regard.
Therefore, the final design will be controlled by planning condition. 
The development will also complement other active travel projects in
this area including the newly developed Paisley – Renfrew cycle path.
A detailed design of the intersection between the east/west route and
this new cycle path will be requested via condition.

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8 
The development incorporates a sustainable drainage system
comprising a network of swales and basins which will drain surface
water to the White Cart. This green infrastructure will also contribute
to the visual amenity of the area. 
The submission includes an outline design for the new bridge crossing
over the White Cart. The outline design is acceptable, and a condition
can be applied to ensure that the final detailed design for the bridge is
submitted for approval. 
It is not anticipated that the development will have a significant
environmental impact with respect to loss of amenity, biodiversity, or
any adverse effects on neighbouring properties in terms of noise or air
quality (these matters are addressed in detail below). 
Transport Scotland have offered no objections regarding potential
impact on the trunk road network. 
In view of the above, I am satisfied that the development complies
with the requirements of policy I1. 
Policy I3 states that new development requires to avoid areas
susceptible to flooding and must not increase the risk of flooding or
have an adverse impact on existing drainage infrastructure. 
SEPA have confirmed that the proposal complies with Scottish
Planning Policy relating to the flood risk framework. I am satisfied on
this basis that the development is acceptable with respect to flood
risk. 
Policy P5 states that development proposals should contribute to and
enhance the wider integrated green/blue network where there are
opportunities for activity and access to open space as well as
increasing accessibility to active travel routes in and around
communities and places. 
The proposed development will improve connectivity and accessibility
within Paisley Town Centre North Transition Area. The development
provides an opportunity to formalise and improve the existing core
path links along Abercorn Street and the aspirational core path link
along Harbour Road. The development will also link into the Paisley to
Renfrew active travel route. 
The development will enhance the green network and increase
accessibility to active travel routes. I am satisfied that it complies with
Policy P5. 
Policy ENV2 states that development proposals will consider the
potential impact on natural heritage. 
No part of the proposed development site falls within an area
designated for the protection of a natural heritage asset. However, the

Page 9

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9 
preliminary Ecology Appraisal notes that there is potential for three
protected sites to be influenced by the development as they are
located downstream. These sites are the Black Cart SPA, the Inner
Clyde SPA, and the Inner Clyde RAMSAR site. 
To assess the potential impact on these sites, the preliminary Ecology
Appraisal includes a Habitats Regulations Assessment (HRA) and an
Appropriate Appraisal (AA). These assessments conclude that
potential impacts on these designated sites can be mitigated through
the implementation of a Construction Environmental Management
Plan (CEMP) to control water pollution. 
NatureScot have offered no objections to the proposed development
and have advised that pollution is not likely to be a significant issue
provided appropriate controls are put in place. A condition will be
attached to ensure the development is undertaken in accordance with
an approved CEMP. 
The implementation of the CEMP will also mitigate potential impact on
the White Cart Water Sites of Importance for Nature Conservation
(SINCS) located to the north of the site. 
Regarding potential impacts on natural heritage assets within the site
boundary, the formation of the bridge crossing will impact an area of
scrub, grassland, and semi natural woodland habitat. The Ecology
Appraisal does not consider this area to be of principal importance
and should not therefore pose a constraint to development provided
the recommendations set out within the ecology appraisal are
implemented on site. The recommendations include compensatory re-
planting of native species to enhance biodiversity. 
The Ecology Appraisal does however note that the White Cart Water
itself is a water body of principal importance that must be protected.
Policy ENV4 states that the blue network will be protected and where
necessary enhanced to facilitate improvements to the water
environment. The implementation of a CEMP will protect the water
environment from being impacted by chemical or silt pollution
associated with the construction of the proposed development.     
The Ecology Appraisal also identifies a tree preservation order (TPO)
on the edge of the proposed development site to the east of Renfrew
Road. It is not anticipated that the scope of works proposed in this
area will impact any trees covered by the TPO. However, it is
anticipated that the scope of works will potentially impact a row of
mature trees at Marchburn Drive as noted above. If planning
permission is granted an appropriate condition shall be imposed to
protect trees, 
Finally, the Ecology Appraisal lists recommendations with respect to
mitigating any potential impact on protected species. This includes
additional surveys where required, and timing of site clearance works.
An appropriate condition has also therefore been attached to ensure

Page 10

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10 
these mitigation measures are implemented on site to the Council’s
satisfaction. 
In addition to the above, the applicant has advised that an appropriate
drainage system which treats surface water prior to discharge into the
White Cart will be developed. An appropriate condition has therefore
been attached to control this matter. 
In view of the above, I am satisfied that the development complies
with the requirements of Policy ENV2 and Policy ENV4.   
Policy ENV5 states that development proposals should not have a
significant adverse effect on air quality within or adjacent to Air Quality
Management Areas (AQMA’s). 
The applicant has submitted an air quality assessment which
considers air quality impact at both the construction and operational
phase of the development. The Environmental Protection Team have
approved these assessments, and SEPA has offered no further
comments on air quality. 
It is noted that the Council’s Environmental Protection Team have
requested an additional assessment to be undertaken when a
construction delivery partner is identified, and that mitigation outlined
in the initial assessment should be implemented as part of a dust
management plan. Both matters can be controlled via condition. 
In view of the above, I am satisfied that the development complies
with the requirements of Policy ENV5. 
Regarding consultation responses not already discussed above, the
Environmental Protection Team have also commented on noise and
ground contamination matters. 
Regarding noise, the Environmental Protection Team have offered no
objections subject to a condition relating to the installation of noise
insulation at properties likely to be impacted by the development. An
appropriate condition has been imposed to control this matter. 
The requirement for a site investigation and remediation strategy to
address ground contamination will also be addressed via condition. 
Matters relating to archaeology and bird hazard management as
raised by the West of Scotland Archaeology Service and Glasgow
Airport Safeguarding respectively can also be addressed by condition. 
Finally in response to the points raised in the letters of representation. 
1.  Regarding increased traffic impacting the local and trunk road
network it is noted that after consultation Transport Scotland had no
objections to the proposed development. It is noted that the final
design will be secured via appropriate conditions should planning

Page 11

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11 
consent be granted and in this regard it is considered that Roads
Officers will have further input following the submission of the final
design package.   
2. It is anticipated that the development will improve accessibility in
this area for walking and cycling. 
3. Planning legislation requires that other landowners within the
application site area are notified and this has been carried out. The
physical impact of the route on any existing business is a separate
legal matter for any affected party to consider. 
Conclusion
The proposed development supports the Council’s City Deal
investment aims and will make a significant contribution to the
Renfrewshire economy. Whilst it is noted that two letters of objection
have been received in relation to this proposal given the above
assessment it is not considered that the concerns raised are sufficient
to justify refusal of this planning application. 
It is considered that subject to the attached planning conditions the
proposed development is acceptable. 
RECOMMENDATION Grant subject to conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. That prior to construction works commencing, the applicant shall submit for
the written approval of the Planning Authority a noise mitigation scheme for
providing an offer of insulation or other suitable noise mitigation to
owner/occupiers with any habitable rooms (living/bedrooms) within the
residential properties at 54 Abercorn Street, Paisley. The noise mitigations
scheme shall thereafter be implemented in accordance with the approved
details. 
Reason: In the interests of residential amenity. 
2. That prior to construction works commencing, the applicant shall submit for
the written approval of the Planning Authority a noise mitigation scheme for
providing an offer of insulation or other suitable noise mitigation to
owner/occupiers living in residential properties in Smith’s Lane and Carlile
Place, Paisley with any habitable rooms (living/bedrooms) experiencing 10
dB or greater increases in noise levels as a result of the additional road
traffic generated by the development.

Page 12

Renfrewshire Council Planning and Climate Change Policy Board 
Page 12 
The noise mitigation scheme will be developed as follows:
a) A new baseline survey will be carried out prior to the construction
works.
b) Thereafter a new survey will be carried out within 3 months of the
approved development being brought into use.
c) Mitigation works will be offered to owner/occupiers of any property
affected.
d) A final noise survey will be carried out 5 years after opening.
e) Mitigation will be offered to owner/occupiers of any property affected. 
The noise mitigations scheme shall thereafter be implemented in
accordance with the approved details. 
Reason: In the interests of residential amenity. 
3. That prior to construction works commencing, detailed construction traffic
data associated with the construction delivery partner shall be screened
against the relevant criteria noted in section 4.5.3 of the Preliminary Air
Quality Assessment ref AMIDSS-AMEY-EAQ-SWI-RP-LE-000001 P01.1
dated 19/05/2022) by Amey Consulting. The Preliminary Air Quality
Assessment shall thereafter be updated accordingly and submitted for the
written approval of the Planning Authority. If necessary, a detailed
assessment of the potential impact from construction traffic on local air
quality should be undertaken to provide a robust assessment of the
proposals. Where necessary, the assessment will include any necessary
mitigation measures to be incorporated into the design of the Scheme. Any
mitigation shall thereafter be implemented on site during the construction
phase to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of residential amenity. 
4. The mitigation measures outlined in Chapter 8 of the Preliminary Air Quality
Assessment ref AMIDSS-AMEY-EAQ-SWI-RP-LE-000001 P01.1 dated
19/05/2022 by Amey Consulting shall be implemented during the
construction phase as part of a dust management plan to prevent any
significant effects occurring to sensitive receptors from dust and particulate
matter releases associated with the construction phase of the Scheme. 
Reason: In the interests of residential amenity. 
5. That during the construction phase, all works and ancillary operations which
are audible outwith the site boundary shall be carried out only between the
hours of 0800 and 1900 on Mondays to Fridays and between the hours of
0800 and 1300 on Saturdays. No such works shall take place on Sundays
and Local Public Holidays. Works and ancillary operations which are
audible outwith the site boundary shall only be permitted outwith these time
periods with the prior written consent of the Planning Authority. 
All mitigation measures as detailed in Section 1.9. of the Noise and
Vibration Assessment by Amey Consulting shall also be implemented on

Page 13

Renfrewshire Council Planning and Climate Change Policy Board 
Page 13 
site during the construction phase of the development in order to reduce
impact of noise during construction. These measures are also described in
further detail in BS 5228-1 Code of practice for noise and vibration control
on construction and open sites. 
Reason – In the interests of residential amenity. 
6. No development shall commence on site until written approval of:
a) a Site Investigation report (characterising the nature and extent of any
soil, water and gas contamination within the site); and, if remedial works
are recommended therein
b) a Remediation Strategy and Implementation Plan identifying the
proposed methods for implementing all remedial recommendations
contained with the site investigation report 
both prepared in accordance with current authoritative technical
guidance, and if relevant
c) A phasing plan showing how the development area is to be subdivided
for the purposes of remediation and/or verification reporting.
has been provided to and approved by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
7. Prior to placement of the final wearing course on the carriageway within an
identified phase/zone
a) a Verification Report confirming completion of the works specified within
the approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site,
a Verification Report confirming imported soils are suitable for use on
the site
shall be prepared in accordance with current authoritative technical
guidance, submitted to the Planning Authority and approved in writing by the
Council.  
Reason: To demonstrate that the works necessary to make the site suitable
for use have been completed. 
8. Development shall not commence until a Bird Hazard Management Plan
(BHMP) has been submitted to and approved in writing by the Planning
Authority in consultation with Glasgow Airport Safeguarding. 
.
The approved BHMP shall be implemented on completion of the
development and shall remain in force for the life of the development. No
subsequent alterations to the BHMP are to take place unless first submitted
to and approved in writing by the Planning Authority in consultation with
Glasgow Airport Safeguarding. 
Reason: To manage the development in order to minimise its attractiveness

Page 14

Renfrewshire Council Planning and Climate Change Policy Board 
Page 14 
to birds which could endanger the safe movement of aircraft and the
operation of Glasgow Airport. 
9. That no development shall take place within the development site until the
developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation
which has been submitted by the applicant, agreed by the West of Scotland
Archaeology Service, and approved by the Planning Authority. Thereafter
the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological
resources within the development site is undertaken to the satisfaction of
the Planning Authority in agreement with the West of Scotland Archaeology
Service. 
Reason: To ensure suitable investigations are undertaken in the interests of
safeguarding archaeological heritage. 
10. That prior to the commencement of development on site, full details of all
soft and water landscaping works shall be submitted as part of a landscape
strategy for the written approval of the Planning Authority. The landscape
strategy shall include (but not be limited to) provisions in respect of: 
 all existing trees and hedgerows to be retained including the
management of these features,
 confirmation of tree protection measures to be implemented on site to
protect existing trees during the construction phase,  
 confirmation of any hedgerows or trees that need to be removed,  
 all proposed trees, shrubs, hedgerows, areas of grass/wildflower
seeding, turfing including size, species, spacing and location,
 all areas of hard standing including location and materials,
 all areas of surface water including ponds, 
 the implementation of all biodiversity and habitat enhancements and
areas of compensatory planting including (but not limited to) those set
out within the Preliminary Ecological Appraisal by Amey Consulting
dated 2022/05/19,
 compliance with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping and Building Design,
 a timetable for the implementation of the landscape strategy,
 a strategy for the future management and maintenance of all
landscaped areas including provision for replacement of trees, shrubs,
hedgerows, and areas of grass/wildflower seeding and turfing if they
were to become diseased, die, become seriously damaged or are
removed within 5 years of being planted. 
The approved landscape strategy shall thereafter be implemented on site in
accordance with the approved timetable and shall be managed and
maintained thereafter to the satisfaction of the Council as Planning
Authority. 
No subsequent alterations to the approved landscaping strategy are to take
place unless first submitted to and approved in writing by the Planning
Authority in consultation with Glasgow Airport Safeguarding.

Page 15

Renfrewshire Council Planning and Climate Change Policy Board 
Page 15 
Reason: To avoid endangering the safe movement of aircraft and the
operations of Glasgow Airport, and to ensure a robust landscaping strategy
is implemented in the interests of visual amenity, landscape character and
biodiversity. 
11. Prior to the commencement of development on site, details shall be
submitted for the written approval of the Planning Authority which clarifies
the implementation of the active travel route along Inchinnan Road,
including any required tree removal.  For the avoidance of doubt,
consideration shall be given to the retention of trees. 
In the event of any tree removal, a compensatory planting scheme shall be
submitted for the written approval of the Planning Authority prior to any
works commencing. 
Reason: In the interest of tree protection. 
12. That prior to the commencement of development on site, the developer
shall submit a detailed Construction Environmental Management Plan
(CEMP) for the written approval of the Planning Authority. The CEMP shall
include (but not be limited to) provisions in respect of: 
 waste management
 pollution control, monitoring, and mitigation
 good practice in environmental and ecological protection including
protected species 
The approved CEMP shall thereafter be implemented on site during the
construction phase. 
Reason: To ensure environmental controls are in place during the
construction phase in the interests of protecting the water and natural
environment. 
13. That prior to the commencement of development on site, the developer
shall submit a detailed drainage strategy for the written approval of the
Planning Authority. The strategy shall detail the capture and treatment of
surface water run off before it enters the surrounding water environment.
Only the approved drainage strategy shall thereafter be implemented on
site. 
Reason: To protect the water and natural environment. 
14. That prior to the commencement of development on site, the developer
shall submit for the written approval of the Planning Authority a set of
drawings detailing the final design of the bridge crossing over the White
Cart Water. Only the approved details shall thereafter be implemented. 
Reason: To ensure the final design of the bridge crossing is acceptable in
the interests of visual amenity.

Page 16

Renfrewshire Council Planning and Climate Change Policy Board 
Page 16 
15. That prior to the commencement of development on site, the developer
shall submit for the written approval of the Planning Authority a set of
drawings detailing the final design of the two lane road and associated
infrastructure. The drawings shall include (but not be limited to) details in
respect of: 
 The layout of the carriageway including provision for footways, cycle
ways and active travel routes.
 All junctions including where the east/west link road meets Renfrew Road
and where the north/south link road meets Inchinnan Road.
 Hard surface finishes.
 Boundary treatments
 The intersection of the east/west link with the Paisley-Renfrew cycle link.
 All soft landscaping including swales, verges, and street trees.
 The pedestrian and cyclist only area at the junction of Abercorn Street
and Harbour Road. 
Only the approved details shall thereafter be implemented on site. 
Reason: To ensure the final design of the road network is acceptable in the
interests of traffic safety and promotion of active travel.     
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact James Weir on 07483370666