Minute of Meeting
Planning and Climate Change Policy Board 
Date Time Venue
Tuesday, 23 August 2022 13:00 Council Chambers (Renfrewshire), Council
Headquarters, Renfrewshire House, Cotton
Street, Paisley, PA1 1AN 
Present: Councillor Jennifer Adam, Councillor Carolann Davidson, Councillor Andy Doig,
Councillor Chris Gilmour, Councillor Neill Graham, Councillor Anne Hannigan, Councillor
Bruce MacFarlane, Councillor Kenny MacLaren, Councillor Jamie McGuire, Councillor Marie
McGurk, Councillor John McNaughtan, Councillor Iain Nicolson, Councillor Jim Paterson,
Councillor John Shaw   
Chair
Councillor Paterson, Convener, presided. 
In Attendance
L McIntyre, Head of Policy & Commissioning, A Morrison, Head of Economy &
Development, D Love, Chief Planning Officer, G McCracken, Development Standards
Manager, S Marklow, Strategy & Place Manager, K Dalrymple, Development Plans &
Housing Strategy Team Leader, F Knighton, Senior Planning Officer, L Johnston, Assistant
Planner, P Moss, Strategy, Policy & Insight Manager, R Smith, Climate Emergency Lead
Officer, L Adamson, Communications & Public Affairs Manager and G Crawford, Senior
Communications Officer (all Chief Executive’s); K Anderson, Sustainability, Place & Assets
Manager (Environment & Infrastructure); and N Young, Assistant Managing Solicitor
(Litigation & Advice); V Howie, Finance Business Partner, R Devine and E Gray both
Senior Committee Services Officers and J Barron and D Cunningham, both Assistant
Democratic Services Officers (all Finance & Resources). 
Webcasting of Meeting
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Board would be filmed for live or subsequent broadcast via the Council's internet site. 
Apology
Councillor Hood.

Page 2

Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting. 
1 Revenue and Capital Budget Monitoring
There was submitted a Revenue and Capital Budget Monitoring report by the Director
of Finance & Resources for the period 1 April to 24 June 2022. 
The report stated that the projected outturn as at 24 June 2022 for all services
reporting to this Policy Board was an overspend position of £0.050 million.  There
were no capital budget projects reporting to this Policy Board. Summaries were
provided over the relevant services in the tables within the report, together with further
analysis. It was noted that the projected outturn was based on information currently
available and assumptions made by service budget holders. It was also highlighted
that revenue budget adjustments totalling £0.934 million, comprising expenditure
adjustments of £0.031 million in respect of the realignment of the Planning Services
budget had been processed since the Budget had been approved at the meeting of
the Council held on 3 March 2022. 
DECIDED: 
(a) That the projected outturn position, detailed in Table1 of the report, be noted; and 
(b) That the budget adjustments, detailed in section 4 of the report, be noted. 
2 Plan for Net Zero
There was submitted a report by the Chief Executive relative to Renfrewshire’s Plan
for Net Zero. 
The report made reference to the national commitment to become net zero by 2045,
and in particular, the legal requirement for the Council, in terms of the Public Bodies
Climate Change Reporting Duties, to set target dates for zero direct emissions and
indirect emission reductions; to report on how spending and resource would
contribute to these targets; and the Council’s contribution to Scotland’s Climate
Change Adaptation Programme.  In this connection the report outlined the key
elements of the Plan for Net Zero, including activities undertaken to date; next steps;
and planned and proposed actions for the next phase.  A quick read version of the
Plan for Net Zero and the complete Plan for Net Zero were appended to the report. 
Renfrewshire’s Plan for Net Zero was Council-led but was for the whole of
Renfrewshire.  The Plan outlined five themes, with key outcomes to be achieved
against each theme. The core principle at the heart of the Plan, was for the Council to
act as a driver or catalyst for change, to lead by example and maximise the
opportunities of a transition to net zero, integrating climate action into the Council’s
financial planning, decision making and existing activities and embedding climate
considerations across all that it did in a way that ensured continued delivery of high

Page 3

quality public services and closely aligned with the Council’s ambitions for
Renfrewshire. 
It was recognised that in terms of achieving net zero ambitions, the scale of the
challenge for Renfrewshire as an area and the Council as an organisation was
significant with many of the levers required to meet the challenge requiring to be
activated by government, potentially through legislation.  Substantial investment at a
local and national level would also be required alongside the successful rollout of
enabling activities within national programmes and the ability to source specialist
expertise and skills. Notwithstanding these challenges, the Plan for Net Zero was
ambitious, it had been developed with local people and organisations and built upon a
strong evidence base.  The next phase of the Plan and associated programme of
work would focus on delivery, accelerating the work that was already in progress and
ensuring that net zero carbon ambitions were a core part of everything that the
Council and its Partners did in Renfrewshire. Ongoing engagement with all
stakeholders was deemed to be integral to the approach taken in delivering on the
Plan, with a strong focus on equality and fairness, and in ensuring that every citizen
was able to participate in the net zero journey as it progressed.  It was noted that in
recognition of this, Council officers would work with Renfrewshire’s Climate Panel to
develop an easy read version of the Plan for Net Zero, to reflect the different levels of
understanding across stakeholders on the journey 
DECIDED: 
(a) That Renfrewshire’s Plan for Net Zero, as appended to the report, be approved for
publication; and 
(b) That it be noted that regular updates would be submitted to future meetings of this
Policy Board on the further development of the Plan and its ongoing implementation. 
3 Climate Change Action Fund - Update
There was submitted a report by the Chief Executive relative to the Climate Change
Action Fund. 
The report made reference to the £1 million of funding made available as part of the
budget approved at the meeting of the Council held on 3 March 2022 to support
progression of the Council’s response to the climate emergency through the Climate
Change Action Fund. The Fund was intended to fund innovative projects and
initiatives being developed by Council services in response to the climate emergency;
provide initial funding to pilot new ideas and approaches; support engagement and
partnership working across Renfrewshire; and/or accelerate the pace of change
already being delivered through existing initiatives.  The process was deemed to be
vital to the Council being able to lever in the external funding that would be required to
support climate change initiatives at the scale and pace required. 
The Climate Change Sub-committee had previously considered a number of funding
proposals developed in response to the climate emergency.  These proposals had
subsequently been approved by the Leadership Board and funding of £978,000
allocated from the Climate Change Action Fund to support 14 projects. A number of
these projects related to feasibility studies or engagement work with local businesses
and communities, and it was stated that good progress had been made in terms of
progressing these and appointing relevant suppliers and specialists to support this

Page 4

work. The appendix to the report provided specific detail. 
The report advised that it was anticipated that £556,000 of the £978,000 funding
allocated to the projects detailed in the appendix would be spent during financial year
2022/23 to deliver the Climate Change Fund Programme and that a balance of
£22,000 currently remained available for allocation. 
DECIDED: 
(a) That the progress update provided on the initiatives funded through the Climate
Change Action Fund to date be noted; 
(b) That the projected financial outturn position, detailed in Table 1, be noted; and 
(c) That the change to the scope of the projects, detailed at section 4.2 of the report,
be noted and approved. 
4 Developer Contributions – Annual Report
Under reference to item 8 of the Minute of the meeting of this Policy Board held on 14
June 2022, there was submitted a report by the Chief Executive being an annual
return detailing developer contributions received in relation to various Section 50,
Section 69 and Section 75 agreements associated with approved planning
applications. 
The report detailed the current status, sums of monies involved and purpose of the
funds. 
DECIDED: That the Developer Contributions Annual Report and the developer
contributions currently held by the Council be noted.   
5 Renfrewshire Planning Performance Framework 2021 / 2022
There was submitted a report by the Chief Executive relative to the Renfrewshire
Planning Performance Framework 2021/22, a copy of which was appended to the
report. 
The report stated that a system of performance management for planning had been
established by local authorities and the Scottish Government, where all planning
authorities required to produce an annual Planning Performance Framework. The
Framework had been developed by the Heads of Planning Scotland to capture and
highlight a balanced measurement of planning performance, showing commitment to
speed of decision making; qualitative story of this year’s planning performance; added
value that planning made in decision making; how policies and guidance had shaped
developments; delivery of good quality development and design; project management
and communication consultation and engagement with communities and
stakeholders. It was noted that the Framework provided planning authorities with an
opportunity to demonstrate continuous improvement, achievements and successes.
The Renfrewshire Planning Performance Framework 2021/22, a copy of which was
appended to the report, demonstrated that the Council continued to perform well in

Page 5

terms of the Scottish average. 
Following discussion, it was noted that the workforce information included within the
return would be updated prior to submission. 
DECIDED: That the Renfrewshire Planning Performance Framework 2021/22 be
noted. 
6 Development Plan Scheme 2022
There was submitted a report by the Chief Executive relative to the annual
Renfrewshire Development Plan Scheme 2022. 
The report stated that the Development Plan Scheme detailed the work required to
prepare, engage and consult on the Local Development Plan 3. The next Local
Development Plan (LDP) for Renfrewshire would be informed by National Planning
Framework 4 and the Regional Spatial Strategy for the Glasgow City Region.  The
report advised that following the publication of National Planning Framework 4 and
new Scottish Government Development Planning Regulations, the timetable for
preparing the next LDP for Renfrewshire would be updated and submitted to a future
meeting of this Policy Board for consideration. 
DECIDED: That the Renfrewshire Development Plan Scheme 2022 be approved. 
7 Development Planning Guidance - Development in the Countryside
(2022) and Display of Advertisements (2022)
There was submitted a report by the Chief Executive relative to the formulation of
development planning guidance on Development in the Countryside and Display of
Advertisements. Copies of the guidance were appended to the report. The guidance
supported the Local Development Plan (2021) and the New Development
Supplementary Guidance (2022). 
The report indicated that the majority of Renfrewshire was rural countryside, protected
from inappropriate development through its designation as greenbelt in the
Renfrewshire Local Development Plan (2021). Renfrewshire’s greenbelt played a key
role in protecting and enhancing the character, landscape, natural setting and identity
of settlements, whilst providing outdoor access to green networks which linked areas
and supported nature networks. The guidance supported the local development plan
providing design advice when considering and preparing development proposals
within Renfrewshire’s countryside. Advertisements and signage provided information
related to goods and services. They were often designed to be eye-catching and
could enliven the street scene. However, they could also have an impact on the
character and appearance of an area resulting in a cluttered and unattractive
environment. The proposed guidance provided good practice advice in relation to the
display of advertisements including the different types of signage, their design, size,
location, materials, illumination and relationship with the surrounding area. The
guidance also set out the circumstances where advertisements could be displayed
without the need for advertisement consent. 
The report indicated that in the event the guidance was approved by the Policy Board
arrangements would be made to publish them on the Council’s website and the

Page 6

design advice would be a material consideration in assessing new development
proposals in the countryside and applications for advertisement consent. 
DECIDED: 
(a) That the publication of the Development in the Countryside (2022) guidance be
approved; and 
(b) That the publication of the Display of Advertisements (2022) guidance be
approved. 
8 Site Development Briefs – Barrhill Crescent, Kilbarchan, Land at
Blythswood, Renfrew & Blackhall Street, Paisley
There was submitted a report by the Chief Executive relative to site development
briefs prepared in respect of a recently allocated residential site within the Local
Development Plan, Barrhill Crescent, Kilbarchan, and two brownfield sites, at
Blythswood, Renfrew and Blackhall Street, Paisley. An electronic link to the proposed
site development briefs was provided within the report. 
The report advised that the site development briefs set out a planning framework for
the sites, identifying a number of factors, including site context; site layout and
building design; landscaping and boundary treatments; accessibility; sustainable
urban drainage; renewables/sustainability; digital connections; affordable housing;
education provision; open space provision; and supporting information, that required
to be addressed in preparing development proposals for the sites. The report
indicated that in the event the site development briefs were approved by the Policy
Board arrangements would be made to publish them on the Council’s website, used
to guide development proposals for the sites and be a material consideration when
considering future planning proposals. 
DECIDED: That the site development briefs relating to the sites at Barrhill Crescent,
Kilbarchan, land at Blythswood, Renfrew and Blackhall Street, Paisley be approved. 
9 Renfrewshire Local Development Plan – Outcome of Court of
Session Appeal
There was submitted a report by the Chief Executive relative to the Renfrewshire
Local Development Plan, the statutory appeal process and outcome. 
The report stated that at the meeting of the Communities, Housing & Planning Policy
Board held on 7 December 2021 it had been agreed that the Renfrewshire Local
Development Plan be adopted. The Local Development Plan had been formally
adopted on 15 December 2021. A statutory appeal had subsequently been received
by the Council on 20 January 2022 from James (Glasgow) Limited seeking to either
quash one chapter of the local development plan or the allocations detailed within the
local development plan as they related to the sites at Thriplee Road, Bridge of Weir
and the former Golf Driving Range, Rannoch Road, Johnstone. The Council had
sought legal opinion from a QC and sought to defend the appeal on the basis of
avoiding the quashing of a complete chapter of the local development plan -
Delivering the Spatial Strategy – Places. The outcome of the appeal had been
intimated to the Council with the Court of Session allowing the appeal and quashing

Page 7

the Renfrewshire Local Development Plan (2021) in the following respects:- (i) in
relation to the Thriplee Road site in Bridge of Weir, to remove the green belt
designation, thereby showing it as ‘white space’ in the adopted Renfrewshire Local
Development Plan (2021); (ii) removing the residential designation of site at Golf
Driving Range, Rannoch Road, Johnstone, thereby showing it as ‘white space’ in the
adopted Renfrewshire Local Development Plan (2021); and (iii) in relation to
Auchenlodment Road in Elderslie, to remove the green belt designation, thereby
showing it as ‘white space in the  adopted Renfrewshire Local Development Plan
(2021). The Council had also been found liable for the appellant's expenses. 
DECIDED: 
(a) That the outcome of the Statutory Appeal in respect of the adoption of the
Renfrewshire Local Development Plan be noted; and 
(b) That the claim for expenses in relation to the appeal be noted. 
10  Tree Preservation Order Requests
There was submitted a report by the Chief Executive relative to the Tree Preservation
Order (TPO) requests agreed at the meeting of this Policy Board held on 14 June
2022, further requests to apply TPO designation to sites in Erskine, Paisley and
Renfrew and proposals for progressing additional TPO requests in Kirklandneuk Park,
Renfrew, Dykebar Hospital, a site located to the south of Caplethill Road and another
in Houston. 
The TPO requests submitted were to be considered in terms of the relevant
legislation, namely, Section 160 of The Town and Country Planning (Scotland) Act
1997 as amended by the Planning etc (Scotland) Act 2006, and within the procedures
set out in the Town and Country Planning (Tree Preservation Order and Trees in
Conservation Areas) (Scotland) Regulations 2011. A summary of the Renfrewshire
Planning & Development Tree Policy 2022, approved at the meeting of the 
Communities, Housing & Planning Policy Board held on 15 March 2022, was
provided. 
The report provided an update in respect of the TPOs previously agreed, at the
meeting of this Policy Board held on 14 June 2022, in respect of the wooded areas at
(i) Sandielands Wood, Inchinnan; and (ii) Erskine Hotel Wood.  It was highlighted that
one comment was received in advance of the TPO for Erskine Hotel Wood prior to
publication.  A summary of the points raised and the response to these was provided. 
It was considered by the Chief Executive that the comments did not alter the
recommendation to apply a TPO designation to the site. 
The report referred to a number of requests received for TPOs to be designated and
advised that, to date, three of the sites involved, at Old Lane SINC, Erskine, Kings
Inch Road, Renfrew and UWS Thornly Park Campus, Paisley had been considered
and assessments undertaken, details of which were provided within the report, and a
recommendation provided in respect of whether a TPO should be made.The report
also indicated that requests for TPO designations had been received in connection
with (i) woodland at Kirklandeuk Park, Renfrew; (ii) Dykebar Hospital Grounds; (iii) a
site in Houston; and (iv) a site located to the south of Caplethill Road. The report
stated that consideration and assessment of these sites would be undertaken and the
findings and recommendations submitted to a future meeting of this Policy Board;

Page 8

Following discussion, Councillor McGurk, seconded by Councillor McNaughtan,
moved; 
(a) That the Tree Preservation Orders in respect of the sites known as Sandieland
Wood and Erskine Hotel Wood be confirmed and that officers make the orders public
and register them with the Land Registry for Scotland; 
(b) That the need for Tree Preservation Orders at the sites known as (i) Old Lane
SINC and (ii) UWS Thornly Park campus and adjacent land, incorporating the
adjacent “North Field” and the area to the south of Caplethill Road identified for off-
site pedestrian route enhancement included in the Reporter’s decision, be approved
and that it be agreed that officers proceed to prepare the Orders, serve them on
relevant parties, make the orders available to the public and seek representations; 
(c) That it be agreed that a tree preservation order designation should not apply to the
site at Kings Inch Road, Renfrew for the reasons outlined in the report; and 
(d) That it be noted that consideration and assessment of the sites at woodland at
Kirklandneuk Park, Renfrew, Dykebar Hospital, and site in Houston would be
undertaken and the findings and recommendations submitted to a future meeting of
this Policy Board.  The amendment was agreed. 
Following discussion, it was also agreed that a survey of trees at planning application
sites and allocated development sites, identified within the Local Development Plan,
be undertaken. 
DECIDED: 
(a) That the Tree Preservation Orders in respect of the sites known as Sandieland
Wood and Erskine Hotel Wood be confirmed and that officers make the orders public
and register them with the Land Registry for Scotland; 
(b) That the need for Tree Preservation Orders at the sites known as (i) Old Lane
SINC and (ii) UWS Thornly Park campus and adjacent land, incorporating the
adjacent “North Field” and the area to the south of Caplethill Road identified for off-
site pedestrian route enhancement included in the Reporter’s decision, be approved
and that it be agreed that officers proceed to prepare the Orders, serve them on
relevant parties, make the orders available to the public and seek representations; 
(c) That it be agreed that a tree preservation order designation should not apply to the
site at Kings Inch Road, Renfrew for the reasons outlined in the report; 
(d) That it be noted that consideration and assessment of the sites at woodland at
Kirklandneuk Park, Renfrew ,Dykebar Hospital and site in Houston would be
undertaken and the findings and recommendations submitted to a future meeting of
this Policy Board; and 
(e) That a survey of trees at planning application sites and allocated development
sites, identified within the Local Development Plan, be undertaken.

Page 9

11  Planning Applications
There were submitted reports by the Chief Executive relative to the following
applications for planning permission that required to be determined by the Board. 
(a) 19/0749/PP: Erection of residential development comprising 96 dwellings
with associated open space, roads, access and landscaping, engineering and
infrastructure works at 40 Rannoch Road, Johnstone PA5 0SP 
In terms of Standing Order 59 Councillor Paterson, moved that the application be
granted subject to the conditions and reasons detailed within the report and a Section
75 agreement being concluded with the applicants to secure eight units for affordable
housing. This was agreed. 
DECIDED: That that the application be granted subject to the conditions and reasons
detailed within the report and a Section 75 agreement being concluded with the
applicants to secure eight units for affordable housing. 
(b) 22/0142/PP: Demolition of existing office building and erection of 67 flats
with associated access, landscaping, open space and parking at 2 Lonend,
Paisley PA1 1SS 
In terms of Standing Order 59 Councillor Paterson, moved that the application be
granted subject to the conditions and reasons detailed within the report. This was
agreed. 
DECIDED: That the application be granted subject to the conditions and reasons
detailed within the report. 
(c) 22/0178/PP: Residential development comprising 59 dwellinghouses and 24
flats, including access, drainage, landscaping and associated works at site
between Sandieland Wood and Flourish Road, Erskine. 
Councillor Nicolson, seconded by Councillor Paterson, moved that consideration of
the application be continued pending further information in connection with the
ecological impact on the site, the proposed treatment for the site boundaries and the
requirement for a Section 75 agreement to be concluded with the applicant in respect
of the affordable housing element of the development. This was agreed. 
DECIDED: That consideration of the application be continued pending further
information in connection with the ecological impact on the site, the proposed
treatment for the site boundaries and the requirement for a Section 75 agreement to
be concluded with the applicant in respect of the affordable housing element of the
development. 
(d) 22/0236/PP: Erection of self-contained student accommodation with
associated facilities, including demolition at 57 High Street, Paisley PA1 2AN. 
Councillor McNaughtan, seconded by Councillor McGurk, moved that consideration of
the application be continued pending a site visit. This was agreed. 
DECIDED: That consideration of the application be continued pending a site visit.

Page 10

(e) 22/240/CA: Demolition in association with the erection of student
accommodation block at 57 High Street, Paisley PA1 2AN. 
Councillor McNaughtan, seconded by Councillor McGurk, moved that consideration of
the application be continued pending a site visit. This was agreed. 
DECIDED: That consideration of the application be continued pending a site visit. 
(f) 22/0248/PP: Formation of outdoor terrace to side of public house at 1 George
Street, Howwood. 
Councillor Gilmour, seconded by Councillor Andy Doig, moved that consideration of
the application be continued pending a site visit. This was agreed. 
DECIDED: That consideration of the application be continued pending a site visit. 
(g) 22/0329/PP: Erection of single storey extension to rear and installation of
rooflight in retrospect at Beijing Banquet, 200 Arkleston Road, Renfrew. 
Councillor Nicolson indicated that he was of the view that the application should be
refused, outlining the main reasons for adopting this position. 
Following a brief adjournment Councillor Nicolson, seconded by Councillor
MacFarlane, moved that the application be refused as it was contrary to Policy P1 on
the basis of the adverse impact on the neighbouring residential properties. This was
agreed. 
DECIDED: That the application be refused as it was contrary to Policy P1 on the basis
of the adverse impact on the neighbouring residential properties. 
(h) 22/0345/PP: Erection of residential development comprising 80 flats and 39
dwellinghouses and formation of roads, infrastructure, open space amenity at
site on southern edge of Roundabout Junction with Laymoor Avenue, King’s
Inch Road, Renfrew. 
Councillor Shaw, seconded by Councillor McNaughtan, moved that consideration of
the application be continued pending a site visit. This was agreed. 
DECIDED: That consideration of the application be continued pending a site visit.