Notice of Meeting and Agenda
Planning and Climate Change Policy Board 
Date Time  Venue
Tuesday, 23 August
2022
13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Jim Paterson (Convener):     Councillor Bruce MacFarlane (Depute
Convener):    
Councillor Jennifer Adam:  Councillor Carolann Davidson:  Councillor Andy Doig: 
Councillor Chris Gilmour:  Councillor Neill Graham:  Councillor Anne Hannigan: 
Councillor John Hood:  Councillor Kenny MacLaren:  Councillor Jamie McGuire: 
Councillor Marie McGurk:  Councillor John McNaughtan:  Councillor Iain Nicolson: 
Councillor John Shaw:   
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.

Page 2

Apologies 
Apologies from members. 
Declarations of Interest 
Members are asked to declare an interest in any item(s) on the
agenda and to provide a brief explanation of the nature of the
interest. 
FINANCE 
1 Revenue and Capital Budget Monitoring 
Joint report by the Chief Executive and Director of Finance and 
Resources. 
1 - 6 
CLIMATE CHANGE 
2 Plan for Net Zero 
Report by Chief Executive. 
7 - 58 
3 Climate Change Action Fund - Update 
Report by Chief Executive. 
59 - 74 
DEVELOPMENT MANAGEMENT & POLICY 
4 Developer Contributions – Annual Report 
Report by Chief Executive. 
75 - 78 
5 Renfrewshire Planning Performance Framework 2021 /
2022 
Report by Chief Executive. 
79 - 82 
6 Development Plan Scheme 2022 
Report by Chief Executive.   
83 - 86

Page 3

7  Development Planning Guidance - Development in the
Countryside (2022) and Display of Advertisements
(2022) 
Report by Chief Executive. 
87 - 90 
8 Site Development Briefs – Barrhill Crescent,
Kilbarchan, Land at Blythswood, Renfrew & Blackhall
Street, Paisley 
Report by Chief Executive. 
91 - 94 
9 Renfrewshire Local Development Plan – Outcome of
Court of Session Appeal 
Report by Chief Executive. 
95 - 102 
10  Tree Preservation Order Requests 
Report by Chief Executive. 
103 - 114  
Planning Applications 
Members must deal with planning applications in an objective
manner to ensure that they cannot be challenged with
accusations of bias or predetermination. Votes on planning
applications must be seen to be impartial and not influenced by
party political issues. 
11  Planning Applications 
Report by Chief Executive. 
11(a)  19/0749/PP - Erection of residential development
comprising 96 dwellings, with associated open space,
roads, access, landscaping, engineering and
infrastructure works at 40 Rannoch Road, Johnstone,
PA5 0SP 
Report by Chief Executive. 
115 - 128 
11(b)  22/0142/PP - Demolition of existing office building and
erection of sixty seven flats with associated access,
landscaping, open space and parking at 2 Lonend,
Paisley, PA1 1SS. 
Report by Chief Executive. 
129 - 142

Page 4

11(c)  22/0178/PP - Residential development comprising fifty
nine dwellinghouses and twenty four flats, including
access, drainage, landscaping and associated works at
site between Sandieland Wood and Florish Road,
Erskine. 
Report by Chief Executive. 
143 - 156 
11(d)  22/0236/PP - Erection of self contained student
accommodation with associated facilities, including
demolition at 57 High Street, Paisley, PA1 2AN. 
Report by Chief Executive. 
157 - 168 
11(e)  22/0240/CA - Demolition in association with the
erection of student accommodation block at 57 High
Street, Paisley, PA1 2AN. 
Report by Chief Executive. 
169 - 172 
11(f)  22/0248/PP - Formation of outdoor terrace to side of
public house at 1 George Street, Howwood. 
Report by Chief Executive. 
173 - 176 
11(g)  22/0329/PP - Erection of single storey extension to rear
and installation of rooflight in retrospect at Beijing
Banquet, 200 Arkleston Road, Renfrew. 
Report by Chief Executive. 
177 - 182 
11(h)  22/0345/PP - Erection of residential development
comprising eighty flats and thirty nine dwellinghouses
and formation of roads, infrastructure, open space
amenity at site on southern edge of Roundabout
Junction with Laymoor Avenue, King's Inch Road,
Renfrew. 
Report by Chief Executive. 
183 - 192

Page 5

No embedded text on this page.

Page 6

No embedded text on this page.

Page 7

To: Planning and Climate Change Policy Board
On: 23 August 2022
Report by:  Chief Executive and Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring as at 24 June 2022 
1. Summary of Financial Position
1.1. The projected revenue outturn at 31 March 2023 for those services reporting
to the Planning and Climate Change Policy Board is an overspend position of
£0.050 million. 
1.2. There are no capital projects reporting to the Planning and Climate Change
Policy Board. 
1.3. This is summarised in the table below and further analysis is provided in the
Appendices. 
2. Recommendations
2.1. Members are requested to:
(a) Note the projected Revenue outturn position detailed in Table 1 above;
and  
(b) Note the budget adjustments detailed at section 4. 
Table 1: Revenue
Division
Revised
Annual
Budget
£000
Projected
Outturn
Core
£000
Total
Projected
Outturn
£000
Budget
Variance 
£000
Budget
Variance 
%
Planning Services 694 744 744 (50) (7.2)
Item 1
PACC230822 Page 1 of 192

Page 8

3. Revenue
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
overspend of £0.050 million (7.2% of total budget) for all services reporting to
this Policy Board.  Detailed division service reports can also be found here,
together with an explanation of any significant projected variances.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to the Board.
3.3. The main reasons for the projected outturn position are indicated below the
tables showing both the subjective analysis (what the budget is spent on) and
the objective analysis (which division is spending the budget).
3.4. The projected overspend of £0.050 million includes an estimated under-
recovery in planning fees of £0.072 million.  This represents c. 12% of
targeted income and reflects a reasonable estimate of income in the current
economic and financial climate. 
4. Revenue Budget Adjustments
4.1. Members are requested to note from Appendix 1 that budget adjustments
totalling £0.031 million have been processed since the Budget was approved
on 3rd March 2022.    
• £0.031m – Planning Services service budget realignment 
__________________________________________________________________ 
Implications of this report 
1.  Financial – The projected budget outturn position for the revenue budget
reported to the Planning and Climate Change Board is an overspend of
£0.051m.  Income and expenditure will continue to be monitored closely for
the rest of the financial year and, where necessary, steps will be taken to
mitigate any overspend.   
Any changes to current projections in Revenue budgets will be reported to
the board as early as possible, along with an explanation for the movement. 
2.  HR and Organisational Development 
None directly arising from this report. 
3. Community/Council Planning
None directly arising from this report. 
4.  Legal 
None directly arising from this report. 
Page 2 of 192

Page 9

5.  Property/Assets 
6.  Information Technology 
None directly arising from this report.
7.  Equality and Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health and Safety
None directly arising from this report. 
9. Procurement 
None directly arising from this report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact
None directly arising from this report. 
12. 
13.
Cosla Policy Position 
N/a. 
Climate Risk
None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
__________________________________________________________________ 
Author: Valerie Howie (Revenue)
Page 3 of 192

Page 10

Appendix 1   
Objective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
P3
Projected
Outturn Core
Business
Total
Projected
Outturn
£000 £000 £000 £000 £000 £000 %
Planning Strategy & Place 472 31 503 485 485 18 3.6%
Development Management 191 0 191 259 259 (68) (35.6%)
NET EXPENDITURE 663 31 694 744 744 (50) (7.2%)
Objective Heading
Planning Strategy & Place
Development Management
No significant projected year end variances to report.
The overspend relates to a projected under-recovery in planning fee income.  There is still an impact on fee
income levels from the current economic and financial climate and income is projected to under-recover by
c. 12% of targeted income.
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 24 June 2022
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  PLANNING SERVICES
Key Reasons for Projected Variance
Page 4 of 192

Page 11

Appendix 1   
Subjective Summary
Approved
Annual Budget
Budget
Adjustments
Revised
Annual Budget
P3
Projected
Outturn Core
Business
Total
Projected
Outturn
£000 £000 £000 £000 £000 £000 %
Employees 910 0 910 888 888 22 2.4%
Premises Related 1 0 1 1 1 0 0.0%
Transport Related 4 0 4 4 4 0 0.0%
Supplies and Services 139 0 139 139 139 0 0.0%
Third Party Payments 0 0 0 0 0 0 0.0%
Transfer Payments 99 0 99 99 99 0 0.0%
Support Services 142 0 142 142 142 0 0.0%
Depreciation and Impairment Losses 0 0 0 0 0 0 0.0%
GROSS EXPENDITURE 1,295 0 1,295 1,273 1,273 22 1.7%
Income (632) 31 (601) (529) (529) (72) (12.0%)
NET EXPENDITURE 663 31 694 744 744 (50) (7.2%)
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  PLANNING SERVICES
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 24 June 2022
Page 5 of 192

Page 12

Page 6 of 192

Page 13

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  23 August 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Plan for Net Zero
___________________________________________________________________    
1. Summary 
1.1 The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 committed
Scotland to become net zero by 2045, with the Public Bodies Climate Change
Reporting Duties placing a legal requirement on public bodies to set target dates for
zero direct emissions and indirect emission reductions; report on how spending and
resource will contribute to these targets; and report on the body’s contribution to
Scotland’s Climate Change Adaptation Programme. 
1.2 Renfrewshire Council has shown leadership at both a strategic level and operational
level to be a driver of change - declaring a climate emergency in June 2019 and
committing to working towards net zero by 2030.  This target is for both the
Renfrewshire area as a whole and Renfrewshire Council as an organisation.   
1.3 Renfrewshire’s Plan for Net Zero is Council-led but is for the whole of Renfrewshire. 
The Plan outlines 5 themes, with key outcomes to be achieved against each theme.
The core principle at the heart of the Plan, is for the Council to act as a driver or
catalyst for change, to lead by example and maximise the opportunities of a transition
to net zero - integrating climate action into the Council’s financial planning, decision
making and existing activities and embedding climate considerations across all that
we do in a way that ensures continued delivery of high quality public services and
closely aligns with our ambitions for Renfrewshire. 
1.4 In terms of achieving net zero ambitions, it must be recognised that the scale
of the challenge for Renfrewshire as an area and the Council as an
organisation is significant.  Many of the levers required to meet this challenge
head on will need to be activated by government, possibly through legislation. 
Substantial investment at a local and national level will also be required alongside the
Item 2
PACC230822 Page 7 of 192

Page 14

successful rollout of enabling activities within national programmes such as transport
infrastructure, and the ability to source specialist expertise and skills.   
1.5 This paper outlines the key elements of the Plan for Net Zero, including activities
undertaken to date; next steps; and planned and proposed actions for the next
phase, with the Quick Read Plan for Net Zero and the full Plan for Net Zero
appended to the paper for Elected Members’ comment and approval. 
1.6 Notwithstanding the challenges outlined above, the Plan for Net Zero is ambitious -
developed with local people and organisations, and built upon a strong evidence
base.  The next phase of the plan and associated programme of work will focus on
delivery – accelerating the work that is already in progress and ensuring that net zero
carbon ambitions are a core part of everything that we and partners do in
Renfrewshire.   
1.7 Ongoing engagement with all stakeholders will be integral to the approach taken in
delivering on this plan, with a strong focus on equality and fairness, and in ensuring
that every citizen is able to participate in the net zero journey as we move forward.  In
recognition of this, Council officers will work with Renfrewshire’s Climate Panel to
develop an easy read version of the Plan for Net Zero, to reflect the different levels of
understanding across stakeholders on this journey. 
2.  Recommendations 
2.1  It is recommended that members of the Planning and Climate Change Policy Board:
• approve Renfrewshire’s Plan for Net Zero for publication as appended to this report;
and
• note that regular updates will be provided to the board on the further development of
the plan and its ongoing implementation. 
3.  Background 
3.1 The Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 committed
Scotland to net zero by 2045, with the Public Bodies Climate Change Reporting
Duties placing a legal requirement on public bodies to set target dates for zero direct
emissions and indirect emission reductions; report on how spending and resource
will contribute to these targets; and report on the body’s contribution to Scotland’s
Climate Change Adaptation Programme. 
3.2 Renfrewshire Council has shown leadership at both a strategic level and operational
level to be a driver of change - declaring a climate emergency in June 2019 and
committing to working towards net zero in Renfrewshire by 2030. Strong governance
has been developed to lead by example and take action to tackle climate change,
including establishing a Climate Change Sub-Committee, now the Planning and
Climate Change Policy Board, and committing £1million to a Climate Change Action
Fund. The fund has supported innovative climate projects and initiatives across
Renfrewshire which build on transformative projects that the Council has already
delivered across our operations.  A core focus of the local programme of work, has
been the development of Renfrewshire’s Plan for Net Zero. 
Page 8 of 192

Page 15

A Plan for All 
3.3 Renfrewshire’s Plan for Net Zero is Council-led but is for the whole Renfrewshire
area.  Moving towards net zero will transform our communities, our economy and
how we deliver our services, therefore engagement is key to ensure all voices are
heard. A key element of the development of the Net Zero Plan has been our
grassroots approach – in developing this Plan, officers gathered different views and
ideas across all our stakeholders to identify and prioritise key areas for action and
ensure everyone can participate in the design and delivery of our transition to net
zero. The Plan for Net Zero is not a ‘one size fits all’, and ongoing engagement will
help to shape the delivery phase of the Plan, using local knowledge and voices to
ensure solutions are tailored to address different needs across different areas and
that no one and no place is left behind. 
3.4 To ensure that all voices are heard in the design and delivery of the Plan for Net
Zero, Renfrewshire’s Climate Panel was formed. It is made up of a representative
sample of Renfrewshire citizens, to look at climate issues, discuss how this affects
people locally and help identify what interventions are needed and what actions can
be taken to collectively support Renfrewshire’s drive towards net zero by 2030.  The
Panel is also attended by members of Renfrewshire’s COP26 Local Ambassadors
(formed as part of the Scottish Government’s COP26 Youth Climate Programme). 
To ensure that every citizen is able to participate in the net zero journey Council
officers will work with Renfrewshire’s Climate Panel to develop an easy read version
of the Plan for Net Zero, as well as a child-friendly version, to reflect the different
levels of understanding across stakeholders on this journey.   
3.5 Carrying out extensive engagement prior to developing the Plan for Net Zero is a
different approach to the one which many other local authorities have taken. This
approach was adopted, as initial research indicated that the Council itself was likely
to be responsible for only a small percentage of Renfrewshire’s overall emissions.  It
was recognised therefore we need to ensure that local businesses, organisations and
citizens were engaged in the journey to net zero, and were able to feel connected to
the Plan and the fundamental requirement for collective action. 
3.6 Collaboration and partnership working across all stakeholders will also ensure that
we maximise the opportunities that arise over time from our transition to net zero,
ensuring benefits are shared equitably to create a greener, fairer, sustainable way of
life for all our citizens, communities and local businesses. 
Evidence base 
3.7 In addition to ensuring that a collective plan was produced through engagement and
collaboration, it was felt that it was also important for any plan that was produced to
be able to develop the foundations upon which we can work towards net zero carbon
emissions by 2030.  Key to this was the development of a local carbon emissions
baseline, which would allow all stakeholders to understand the scale of the ambition,
to identify targeted actions which could reduce emissions, and also allow our
progress towards net zero emissions to be monitored and reported. 
3.8 Officers worked with external technical consultants to baseline emissions for
Renfrewshire Council as an organisation as well as the Renfrewshire area as a
Page 9 of 192

Page 16

whole. This showed where we had started from (using 2014/15 as our baseline);
where we are now; and a best case and worst case trajectory of our emissions to
2030 for both the Council and the area as a whole. 
3.9 The baselining work showed that Renfrewshire Council makes up around 2.5% of the
area’s total emissions. Renfrewshire Council emissions are dominated by buildings
that we are responsible for (67%).  The most significant emissions source is school
buildings (47%) which are the largest element of our estate. This Council emissions
data did not include facilities managed by OneRen (such as leisure facilities,
museums and libraries) but this is currently being established and the data for the
buildings managed by OneRen will be included in annual emissions monitoring.
Transport is the second highest source of Council emissions at 17%. For the
Renfrewshire area, transport is the highest source of emissions at 34%, followed by
both residential energy use and commercial and industrial energy use, at 29%.           
3.10 This evidence base has enabled us to identify and prioritise key sectors and actions
in order to reach net zero and will be a valuable engagement tool with stakeholders
to stimulate action and encourage partnership working and collaboration. The
baselining work also produced a modelling tool that can be updated to report
progress to net zero – so this work is not just a snapshot in time, but a live monitoring
tool that can be updated as projects are proposed; national targets and policies are
updated; and/or data sets are improved and updated. 
3.11 Although the Council makes up a small percentage of the area’s emissions, as a
local authority we can influence emissions in areas including planning, buildings,
housing, education, energy, transport and waste. It is estimated that local authorities
can influence around 33% of an area’s emissions through sectors that are directly
shaped by local authority practice, policy or partnerships.   
The Roadmap to Net Zero
3.12 The first phase of the Plan for Net Zero outlines an approach for the Council to lead
by example and maximise the opportunities of a transition to net zero - integrating
climate action into all that we do in a way that ensures continued delivery of high
quality public services and closely aligns with our ambitions for Renfrewshire.  
3.13 Renfrewshire’s Plan for Net Zero will be delivered through 5 focus areas with key
outcomes for each, which have been identified and shaped by our stakeholder
engagement:
o Clean Energy: we will minimise energy demand, maximise energy
efficiency and transform our energy systems to deliver clean, affordable
energy for all
o Sustainable Transport: we will maximise sustainable transport
opportunities to deliver an inclusive, affordable transport system that
provides choice for all
o Circular Economy: we will make Renfrewshire a circular economy society:
minimising waste and maximising reuse, recycling and recovery of
resources rather than treating them as waste
o Connected Communities: we will empower our communities by ensuring
an inclusive and just transition to net zero with social justice and health and
wellbeing at its core for current and future generations
Page 10 of 192

Page 17

o Resilient Place: we will optimise biodiversity and nature locally to enhance
our natural environment and maximise green economic opportunities while
planning and preparing for impacts of climate change 
3.14 The attached Plan for Net Zero builds on these focus areas and outlines a vision and
strategic direction in response to the climate emergency for Renfrewshire: 
‘We want to end Renfrewshire’s contribution to climate change within a
generation.  We are committed to working towards net zero by 2030 for the
whole of Renfrewshire to ensure a safer, healthier, greener and fairer place
for everyone to live, work and spend time in.’ 
3.15  The Plan describes the context for our strategic direction in Renfrewshire, and the
importance of working together across the Council and beyond, to ensure projects,
programmes and approaches complement each other, make the best use of
expertise and experience, and maximise resources while closely aligning with our
Council and Community Plans, and national and local policies and strategies. 
4.  Next steps 
4.1 The change needed to reach net zero is unprecedented. Many of the levers to make
the structural change required, such as legislation, will need to come from national
government. Substantial investment at a local and national level is required alongside
the successful rollout of enabling activities within national programmes such as
transport infrastructure, and the ability to source specialist expertise and skills. It will
require long-term financial resources, upskilling and reskilling of local workforce,
exploring new business models and large-scale investment to support the scale and
pace of change required and align investment with climate priorities. 
4.2 In recognition of this, the next phase of the Plan for Net Zero is centred on delivery. 
The delivery stage will see action being scaled up and accelerated – identifying and
initiating new ways of working; completing smaller exemplar projects and using
lessons learned to scale up and replicate; exploring new technologies and innovative
delivery methods; identifying opportunities for partnership delivery; and progressing
longer term projects such as tree planting and peat bog restoration.   
4.3 This will require the organisation to consider opportunities to fund or to access
funding to deliver projects which deliver Net Zero ambitions, and to maximise
opportunities for carbon reduction through existing programmes of work. 
4.4 Looking ahead to Phase 2 of the Plan for Net Zero, the next steps are as follows: 
Step Indicative date
Child Friendly Plan for Net Zero: developing an update
report specifically aimed for children and young people,
given the importance of this agenda for them and to ensure
inclusivity of our approach. 
31st October 2022
Easy Read Plan for Net Zero: developing an easy read
version of the Plan for Net Zero, working with 31st October 2022
Page 11 of 192

Page 18

Renfrewshire’s Climate Panel, to ensure every citizen can
participate in the design and delivery of the Plan.
Detailed Phased Road Map to 2030: looking strategically
and holistically across the whole Renfrewshire area to
identify opportunities and solutions and to set phased
targets to net zero, which will be highlighted in the form of a
road map with to aid communication with stakeholders.  
31st March 2023 
Quantified Delivery Plans: linked to the above, setting
out costed, phased area based delivery plans with
benchmark capital costs for each period of the Net Zero
road map; and quantifying and considering all impacts of the
proposed delivery plans, including those that cannot be
monetised (e.g. carbon reduction, fuel poverty alleviation,
job opportunities).
Costed delivery plans
will be prioritised and
phased for completion
between 31st March
2023 and 31st October
2023
Developing a carbon budget for Renfrewshire Council:
identifying emissions by service area to improve
understanding of how Council emissions relate to the
services we provide and the reductions needed in order to
adapt to delivering high quality local services in a way that is
fit for a resilient, net zero future.  
6th April 2024
Developing an Adaptation Plan for Renfrewshire:
developing adaptation solutions and implementing a phased
programme of priority actions which are designed to
respond to and address the local impacts of climate change
that are already happening, as well as prepare for future
climate risks across the Renfrewshire area. These actions
will be centred around communities, security and resilience,
infrastructure and our local environment.
31st October 2023 
Verifying, adopting and updating our emissions
modelling tool: quantifying the impact of the phased
actions, to inform future targets and present data in an
interactive way for stakeholders.
Annual updates from 1st
November 2023 as
projects and new
technologies are
implemented   
Implications of the Report
1. Financial – delivering the Plan for Net Zero will have resource implications for the Council
and includes a commitment to working collaboratively to ensure best value for our approach. 
The full extent of the resource implications will be established during Phase 2 of the Plan. 
2. HR & Organisational Development – the Plan for Net Zero links closely with our OD and
workforce planning to ensure our people have the skills and tools required to do their job in
the best possible way. 
3. Community/Council Planning – the Plan for Net Zero includes updates and further
proposals to support engagement and collaboration with local businesses, partners and
communities on the climate emergency agenda and highlights the continued activities which
support the key priorities set out in the Council and Community Plans to tackle inequality and
widen opportunity.   
4. Legal - the Plan for Net Zero  has no significant legal implications, however future actions
may have some level of implication. 
Page 12 of 192

Page 19

5. Property/Assets - the Plan for Net Zero may have significant implications for property and
assets given the nature of the work involved. 
6. Information Technology – none. 
7. Equality and Human Rights - The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website.  In addition, social justice and reducing inequalities is at
the core of the Plan for Net Zero and one of its overarching outcomes. 
8. Health and Safety – none. 
9.  Procurement – the Plan for Net Zero has significant procurement implications given the
nature of the work involved. 
10. Risk – The climate emergency brings a risk to Council and its communities in relation to
increased extreme weather as well as food insecurity. The Plan for Net Zero has a focus on
both mitigation and adaptation and has social justice at its core to ensure a just transition so
no one is left behind and no one is disadvantaged in the transition to net zero. The Plan for
Net Zero has key focus areas outlining actions the Council can take to support and enable
those most disadvantaged. A key risk is that the Council is not in control of all of the levers,
and cannot deliver everything required in isolation, so there is a risk that others do not
contribute to meet the net zero target. 
11.  Privacy Impact – none. 
12. COSLA Policy Position – this work aligns with COSLA’s current work alongside the Scottish
Government in response to the climate emergency. 
13. Climate Risk – this report outlines work being undertaken by the Council to respond to the
climate emergency. 
Appendix 1: Quick Read Plan for Net Zero 
Appendix 2: Renfrewshire’s Plan for Net Zero
___________________________________________________________________ 
List of Background Papers:
Climate Emergency Work Programme: Progress Update, 14 June 2022 Planning and Climate Change
Policy Board 
Author:   Roz Smith, Climate Emergency Lead Officer 
Chief Executive’s Service 
Page 13 of 192

Page 20

Page 14 of 192

Page 21

PLAN
FOR
NET
ZERO
CLEAN
ENERGY
SUSTAINABLE
TRANSPORT
CIRCULAR
ECONOMY
CONNECTED
COMMUNITIES
RESILIENT
PLACE
Our Plan for Net Zero  
We want to end Renfrewshire’s contribution to climate change within a generation. 
We are committed to working towards net zero by 2030 for the whole of
Renfrewshire to ensure a safer, healthier, greener and fairer place for everyone to
live, work and spend time in 
RENFREWSHIRE’S PLAN FOR NET ZERO 
PHASE 1: WORKING TOWARDS NET ZERO EMISSIONS BY 2030 
Item 2
PACC230822 Page 15 of 192

Page 22

From evidence and research we know that human activities are the main cause of climate change.  Many of our actions produce greenhouse gas emissions, raising our
planet’s temperature and causing our climate to change.  Emissions from greenhouse gases from burning fossil fuels, from the way we treat valuable resources as ‘waste’
and from land use changes have all contributed to global warming, and this is the biggest threat to our planet.  Our response to the climate emergency brings opportunities
for our local communities and economy.  It also brings potential solutions to tackle inequalities, including those exacerbated by the COVID-19 pandemic and the current
cost of living crisis.   
Renfrewshire Council has shown leadership at both a strategic level and operational level to be a driver of change - declaring a climate emergency in June 2019 and
committing to work towards net zero by 2030.  We have developed strong governance to lead by example and take action to tackle climate change, including establishing
a Climate Change Sub-Committee, now the Planning and Climate Change Policy Board, and committing £1million to a Climate Change Action Fund supporting innovative
climate projects and initiatives across Renfrewshire which build on transformative projects that the Council have already delivered across our operations.   
When we’re talking about net zero for Renfrewshire, we mean reducing greenhouse gas emissions to as close to zero as possible (from our
energy, resource use, transport, etc.) and locking up remaining emissions through initiatives like tree planting, restoring peat bogs and carbon
capture and storage schemes.  This makes the balance of our emissions ‘net’ zero. 
This Plan is Council-led but is for the whole Renfrewshire area and we need everyone to participate to achieve our ambitions.  Moving towards net zero will transform our
communities, our economy and how we deliver our services, so engagement is key to ensure all voices are heard. In developing this Plan, we worked hard to gather
different views and ideas with a Climate Survey, a Business Survey, establishing our representative citizens Climate Panel and working with local public, private and third
sector and community planning partners to get everyone involved. 
Throughout this summary document and the full Plan, you will notice references to ‘we’ – this means Renfrewshire Council as a lead partner and producer of this Plan,
but it also means Renfrewshire stakeholders, communities, citizens and the people we’ve been speaking to as we pull together this Plan and shape our route forward. 
To work collectively to reduce emissions, it is important to have a robust evidence base.  Our greenhouse gas emissions baseline for Renfrewshire Council as an organisation
and Renfrewshire as an area highlights progress made so far and the gaps we need to fill with actions reach net zero.  Renfrewshire Council makes up around 2.5% of the
area’s total emissions, with buildings we are responsible for being the main source of emissions (67%), followed by transport (17%) and waste collection (8%).  For the
Renfrewshire area, transport is the biggest source of emissions (34%), with residential energy use and commercial and industrial energy use both on 29%.  The Plan for
Net Zero will identify and prioritise action across all of the different sectors in collaboration with all of our stakeholders, and signpost to information, advice and support
(including financial support) to enable change to work towards net zero.         
This work will help to identify and prioritise actions across all sectors in collaboration with stakeholders.  We will work together with partners, businesses, local people and
communities to target 5 focused outcome areas, creating opportunities for all.  The key focus areas of activity which we will progress, lead and enable are:
o Clean Energy: we will minimise energy demand, maximise energy efficiency and transform our energy systems to deliver clean, affordable energy for all
o Sustainable Transport: we will maximise sustainable transport opportunities to deliver an inclusive, affordable transport system that provides choice for all
o Circular Economy: we will make Renfrewshire a circular economy society: minimising waste and maximising reuse, recycling and recovery of resources rather
than treating them as waste
o Connected Communities: we will empower our communities by ensuring an inclusive and just transition to net zero with social justice and health and wellbeing
at its core for current and future generations
INTRODUCTION 
Page 16 of 192

Page 23

o Resilient Place: we will optimise biodiversity and nature locally to enhance our natural environment and maximise green economic opportunities while
planning and preparing for impacts of climate change  
There will always be emissions that we are unable to remove, such as those associated with medicines and anaesthetics.  Even a best case scenario has shown that both
Renfrewshire Council and Renfrewshire area would have remaining emissions that would need to be offset.  The Plan for Net Zero aims to set out how we can take action
collectively to reduce emissions as low as possible, leaving achievable emissions levels to offset.   
There is not a ‘one size fits all’ solution across Renfrewshire – we need to look on an area by area, community by community basis to tailor solutions to meet local needs
and make sure that no one is left behind.  We need to identify and understand barriers to change, so that we can find solutions and we need to transition in a way that is
just, creates opportunities equitably and creates a greener, fairer, sustainable way of life for all our citizens, communities and local businesses. 
We want everyone to be involved - our engagement will be ongoing to raise awareness and encourage conversations with all stakeholders as the Plan is implemented.  We
will develop a communications plan to ensure a coordinated approach for ongoing engagement to ensure people can follow progress and participate in climate activities
across Renfrewshire; continue effective governance in partnership with public, private and community organisations; and develop visualisation tools to model, monitor
and report progress.   
We will welcome comments and feedback from all citizens, communities and stakeholders on Phase 1 of the Plan for Net Zero.  This will inform Phase 2 of the Plan for Net
Zero – which will outline our route map to net zero and the phased actions, projects, resources and interventions that will enable us to reach our target. 
The change needed to reach net zero is unprecedented. It will require long-term financial resources and large-scale investment. It will require government at all levels to
redirect and, in some cases, reprioritise existing finance to support the scale and pace of change required and align investment with climate priorities.  The delivery of high
quality public services remains a priority - with the transition to net zero and a green recovery from COVID-19 bringing opportunities for increased efficiencies and potential
service improvements through rebuilding and designing better systems and putting things back together differently.  In addition to traditional avenues of funding, it will
be key to explore more innovative and collaborative ways to finance climate action across stakeholders, including new business models; joint ventures and partnership
projects; and potential crowdsourcing initiatives such as community municipal bonds.  Knowledge sharing and collaboration across stakeholders, as well as with other local
authorities, will be key to understand different approaches, solutions and best practice. 
This approach, pipeline of projects and investment in a net zero society and green economy also brings opportunities for the local workforce and market confidence for
supply chains and manufacturing through the implementation, installation, construction and maintenance of projects.  We need to identify and address skills gaps and
ensure a proactive approach to the upskilling, reskilling and training required to ensure this large-scale job creation and sustainable employment opportunity is retained
locally as much as possible; to limit the transition risks; and ensure that skills interventions lead to a more inclusive and productive, resilient and future-proofed economy       
We will require ambition, drive and collective local action beyond the national contribution in order to work towards net zero by 2030.  This will
be achieved through targeted action across our 5 focus areas: clean energy; sustainable transport; circular economy; connected communities;
and resilient place. 
Please get involved and let us know what you think about the areas of focus, issues or opportunities within your community and what you would like
to see locally to shape the Plan for Net Zero: 
climate@renfrewshire.gov.uk
Page 17 of 192

Page 24

Renfrewshire’s energy consumption makes up over half (58%) of the area’s total emissions.  Energy
costs are increasing at a time when we are recovering from the COVID-19 pandemic, and many citizens
are experiencing a cost-of-living crisis.  As a Council, we need to take this into account in everything we
do.  The Plan for Net Zero will outline a transition to clean energy systems to provide reliable, secure,
affordable energy for everyone.  The majority of Renfrewshire’s homes and businesses, including the
Council estate and Council housing stock, are currently heated and powered by fossil fuels which
contribute to climate change – and many are older and less well insulated, making them harder and
more expensive to heat, which increases carbon emissions and exacerbates issues with fuel poverty.   
It is vital that we cut emissions from Renfrewshire’s homes and businesses, in a way that ends fuel
poverty, ensures warm homes and buildings and develops a thriving, wellbeing economy.  Changes to
how we generate, supply and use energy will be challenging but transitioning to clean energy systems
also brings opportunities.  The Plan for Net Zero will follow the energy hierarchy and this will be applied
to the Council estate, as well as identifying opportunities in our communities and for local businesses
– reducing energy use at source; maximising energy efficiency; then meeting the remaining demand by
renewable and low carbon energy systems.  Traditional sources of energy will be a last resort and the
carbon associated will be offset locally to compensate.   
This approach will reduce reliance on fossil fuels, support the growth of net zero local economies and
tackle climate change while addressing specific energy issues faced locally within our communities -
ensuring energy security, affordability and resilience. 
CLEAN ENERGY: We will minimise energy demand, maximise energy efficiency and transform our energy systems to deliver
clean, affordable energy for all 
PRIORITY AREAS FOR CLEAN ENERGY
1: minimising energy demand: reduce energy waste to reduce
demand at source
2: maximising energy efficiency: improved energy efficiency across
all homes and buildings to reduce consumption and remove poor
energy efficiency as a driver for fuel poverty
3: maximising sustainable energy generation: decarbonise the
energy we use for heating, power and transport - matching local
demand and local supply with community involvement and using
energy storage to optimise the amount of locally generated energy
able to be used locally
4: alleviating fuel poverty: through improved energy efficiency and
the provision of affordable, low carbon heat and power, ensuring
warm homes to improve wellbeing and reduce health inequalities 
5: energy security and resilience: a managed energy transition to
ensure resilient communities, with secure and affordable energy
supplies for everyone 
6: offsetting: conventional sources of energy as a last resort, with
local carbon offsetting to compensate   
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO CLEAN ENERGY:
1: We will undertake a strategic review of all the buildings we own to ensure more efficient use: minimising energy consumption; reducing energy waste; maximising energy
efficiency; and ensuring all public and community buildings have renewables where technically feasible - monitoring and sharing our progress to ensure transparency and
facilitate replication by others
2: We will generate the equivalent of 100% of the Council’s public buildings’ power needs and ensure 100% of the Council’s public building heating requirements are carbon
neutral by 2030 
3: We will implement measures in Council housing stock to reduce carbon emissions by 68% (from 2020 levels) and work towards ensuring all Council housing stock has an
EPC of B by 2030 where feasible.  Where possible we will work with private homeowners within mixed tenure blocks to help them to participate and benefit from Council
energy efficiency improvement programmes and will work with owner-occupiers and the private rented sector to share learnings and identify opportunities to reduce costs
for all through economies of scale  
4: We will increase energy security and resilience - mapping strategically across Renfrewshire to identify local energy solutions for heat, power and transport on an area-by-
area basis.  This will accelerate deployment of local energy systems where local supply meets local demand; using input from stakeholder engagement to ensure we tailor
solutions to respond to and meet our communities’ social and environmental needs, including alleviation of fuel poverty and will ensure the benefits of local energy systems
stay within our communities 
5: We will work with regional partners to attract large-scale public and private investment to ensure community wealth building, quality green jobs and resulting in inclusive,
empowered, resilient, sustainable communities with a reduced reliance on fossil fuels, for example increased community and locally owned energy
Page 18 of 192

Page 25

Transport infrastructure is a key economic and social driver – it connects people to jobs,
education, services and each other.  However transport is also the biggest contributor of greenhouse
gas emissions in Scotland and in Renfrewshire, and these emissions have not reduced much over the last
10 years.  Transport makes up 34% of Renfrewshire’s total emissions - made up of personal travel (diesel
and petrol cars, motorbikes and buses); freight (HGV, diesel and petrol LGV); and railways.  Council fleet
makes up 17.3% of Renfrewshire Council’s total emissions.  This is an area where collectively we
have an opportunity to significantly reduce our emissions; improve the air that we breathe; save money;
and improve health and wellbeing by choosing different forms of travel, whether it’s a short trip to the
shops or a longer commute to work and includes changing how we work as a Council and how staff travel
as part of daily work duties. 
In order to cut emissions from transport at the scale required to meet net zero, we will need to be
ambitious.  A transport system designed around private car use can make getting about for non-car users
difficult and causes barriers to people moving around and accessing services they rely on.  Sustainable
transport is not just about switching to electric vehicles (EVs) - it’s about how we organise all transport;
where we source goods from; and how goods and people are moved around.  Redesigning and improving
local areas, and freeing up local space traditionally used by private vehicles, provides opportunities to
create more green and open spaces for communities to enjoy and will make our local areas safer, more
attractive and healthier places to live, work and spend time in.   
Quality, connected transport systems will enable everyone to access goods, services and social
connections that are essential for health and wellbeing.  Improvements in transport connectivity reduce travel time and lower the costs of transporting goods and people,
bringing benefits to citizens and businesses through greater employment and social opportunities, increased economic productivity and local economic growth and investment.  
We will address common issues with current transport systems to ensure equal access to opportunities and services and support transition away from car use as much as possible.
SUSTAINABLE TRANSPORT: We will maximise sustainable transport opportunities to deliver an inclusive, affordable transport system
that provides choice for all 
PRIORITY AREAS FOR SUSTAINABLE TRANSPORT 
1: maximise active travel opportunities: making walking, cycling
or wheeling easy, safe and attractive travel options for all through
effective infrastructure
2: increase public transport patronage: enabling an inclusive,
safe, effective and affordable public transport network for
everyone
3: minimise car miles: support behaviour change through
improved and enhanced active travel and public transport
provision to reduce car miles
4: enable modal shift to Ultra Low Emission Vehicles (ULEVs):
putting in place infrastructure and strategies to enable shift to
ULEV cars, buses and heavy goods vehicles 
5: alleviate transport poverty: advancing equality of opportunity,
ensuring everyone has safe and affordable transportation to
access services, employment and social activities
6: local carbon offsetting: to make every trip in the Renfrewshire
area net zero carbon 
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO SUSTAINABLE TRANSPORT: 
1: We will remove the need for new petrol and diesel light commercial vehicles in the Council fleet by 2025 and phase out the need for all new petrol and diesel vehicles in
the Council fleet by 2030
2: We will explore options for a public bike share scheme (including e-bikes) and will continue to work with local communities to identify active travel infrastructure to be
systematically upgraded and extended where feasible and create strategic new paths for functional journeys, alongside policy updates and promotion to enable more people
to walk, wheel and cycle safely and more often
3: We will ensure safer streets that enable active travel, including introducing 20mph zones where proportionate to make our communities safer, identifying suitable areas
for pedestrianisation and segregated/off road active travel networks 
4: We will work with public transport partners to explore options for increasing deployment of low emission buses, including electric and hydrogen vehicles, and improving
public transport provision across the area
5: We will advance equality of opportunity by exploring options for a public EV car club scheme and through continuing to invest in and expand public EV charging
infrastructure across Renfrewshire, and will meet the equivalent of 100% of this increased electrical demand from renewables by 2030 
Page 19 of 192

Page 26

A circular economy is a key part of the solution to the climate emergency – where products, services and
resources are optimised; where everything has value; and waste is minimised or designed out.  It is
described as ‘make, use, reuse, remake’ instead of the current linear system of ‘buy, use, dispose’.  This will
help dramatically reduce waste generated, as well as saving the Earth’s valuable finite resources, reducing
our emissions and reducing costs.  Renfrewshire’s latest data shows that 83.5% of household waste is now
being diverted from going to landfill – due to a comprehensive waste and recycling collection service
changes and our participation in the Clyde Valley Waste Project which generates energy from residual waste
(i.e. non-recyclable waste from the grey bins). 
Around 13% of Scotland’s waste is currently processed outside Scotland.  This represents a potential
economic opportunity which, with Renfrewshire’s strong manufacturing base, can be seized to create new
business models and create local employment.  Through the Plan for Net Zero we will work with citizens to
tackle our throwaway culture to reduce demand for raw materials, encourage reuse, repair and
remanufacture to prevent waste and work with local businesses to identify the opportunities of maximising
the value of materials through recycling and recovering materials and energy, creating a circular economy
with opportunities and benefits that stay within our communities. 
Donating pre-loved items to reuse organisations is a great way to support all households to access quality,
affordable items and ensures reusable furniture, electrical items, household goods and clothing that are
functional and fit for sale can be used by others.  Many reuse organisations also provide additional social
benefits and opportunities including upskilling of volunteers and pathways to paid employment as well as
diverting waste from landfill.  The Plan for Net Zero will follow the waste hierarchy – with preventing waste
at source being the key priority, followed by reuse and repair, recycling, recovery and then disposal as a last resort.  Changing the way we use and reuse materials and stimulating
the development of new markets to deal with future waste and materials will bring sustainable, long-term local economic opportunities.  Transitioning to a circular economy will
keep our resources and materials in use for as long as possible, extract the maximum value from them whilst in use, then recover and regenerate products and materials at the
end of each service life.    
CIRCULAR ECONOMY: We will make Renfrewshire a circular economy society: minimising waste & maximising reuse,
recycling & recovery of resources rather than treating them as waste  
PRIORITY AREAS FOR A CIRCULAR ECONOMY 
1: reduce waste at source: minimise carbon impact per person
in the products and services we buy through cutting
consumption and reducing waste at source, including water
conservation, eliminating demand for non-essential single use
and disposable items
2: maximise reuse, repair and recovery: make more effective
use of resources through keeping goods and materials in use
for longer, stepping away from a ‘take-make-dispose’ economy
3: sustainable waste management: enable behaviour change
and embrace innovation to maximise recycling and composting
and minimise waste going to landfill through comprehensive
engagement
4: supporting communities to reduce waste: facilitating
initiatives such as community fridges; pre-loved school
uniforms; tool share stations; and mending and repair skill-
sharing workshops
5: offsetting: disposal as a last resort, with local offsetting of
associated emissions to compensate 
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO A CIRCULAR ECONOMY:
1: We will identify procurement hot spots within the Council’s supply chains, activities and operations to maximise circular economy opportunities; optimise local supply
chains; and identify areas where we can reduce carbon in the products and services we buy through innovative procurement  
2: We will ensure recycling is accessible for everyone, including non-standard properties, e.g. tenements and flats, and work to resolve problem areas such as storage space,
stairs, communal bins, lack of participation and fly tipping through ongoing stakeholder consultation and engagement
3: We will ensure that all Council buildings, including schools, have the facilities for the full recycling collection service and work with local businesses and commercial waste
providers to identify improvement opportunities  
4: We will promote sharing and repairing behaviours (including within our own operations) and work with local partners to expand existing models of sharing libraries and
repair cafés and workshops 
5: We will reduce the carbon impact of waste from Council operations annually per head of population, monitoring and sharing progress as well as lessons learned from
initiatives which have been implemented
Page 20 of 192

Page 27

The climate crisis is not felt equally – this is true in Renfrewshire, in Scotland, and across
the world.  Climate change makes existing inequalities worse such as poverty, disability,
poor health.  Often the most vulnerable and disadvantaged in our communities, who have
contributed least to climate change, are most impacted.   
Putting people and our communities at the centre of our transition to net zero will enable
us to address existing and future inequalities, creating benefits and opportunities for all. 
To ensure social justice and a just transition, we will listen to our communities and explore
the risks, benefits and impacts of decarbonisation on those living in poverty and other
vulnerable groups within our society.  This will ensure the benefits of the transition are
fairly distributed; will reduce the gap between the richest and poorest; and will ensure the
most vulnerable in our society are not further disadvantaged as a result of unintended
consequences. 
‘Place’ is a key aspect of the Plan for Net Zero.  Through understanding our area, we
recognise the differences across local areas and settlements (i.e. rural vs urban; gas grid vs
off gas grid) so that proposed solutions reflect each area and take into account local
distinctive needs; opportunities and priorities.  The Plan for Net Zero will be a joined up
approach across all our stakeholders - using the skills, expertise and capacity of partners,
communities and businesses across local areas to identify opportunities.  This will
encourage collaboration and partnership working with groups within those areas so that
solutions can be community led.
CONNECTED COMMUNITIES: We will empower our communities by ensuring an inclusive and just transition to net zero with social
justice and health and wellbeing at its core for current and future generations  
PRIORITY AREAS FOR CONNECTED COMMUNITIES 
1: comprehensive and ongoing engagement: including traditionally under-
represented groups, to ensure all voices are heard, enabling all stakeholders to
contribute to the design and delivery of the Plan for Net Zero
2: supporting community initiatives and partnership working: enable local
action through knowledge sharing and skill sharing and identify local spaces
suitable for community projects as well as opportunities for collaborative
working, with stakeholder involvement to ensure solutions are tailored to
different communities’ needs, increasing community resilience and ensuring
benefits stay local
3: socio-economic impact assessments: to identify and evaluate direct and
indirect impacts of proposed interventions and projects to ensure benefits are
shared equitably and no one is further disadvantaged
4: our children and young people: children and young people are the least
responsible for climate change and inequalities yet are affected by the impacts
of both.  We will work with our children and young people to address their
priority issues which affect them and identify solutions to benefit them, their
families and wider society and tackle existing and future inequalities to improve
outcomes for all
5: support and advice: signposting to grant funding and ensuring impartial
advice and support is in place in advance of change 
HOW THE COUNCIL WILL LEAD & ENABLE CONNECTED COMMUNITIES:
1: We will work with partners and local organisations to launch a one-stop information service which links and signposts to support and advice across all areas of the Plan for
Net Zero and to help address the cost of living crisis   
2: We will implement the Fairer Scotland Duty in all our decision making and actions in response to the climate emergency to ensure all decisions and actions help to tackle
inequality as well as reducing emissions
3: We will embed community wealth building into our procurement practices to ensure a local-centred approach which redirects wealth back into the local economy and
provides opportunities and benefits into the hands of local people
4: We will work with our communities to identify opportunities for land and assets within their local area to develop local projects which benefit those who live there, e.g.
community energy opportunities, food growing, wild flowering and tree planting, flood resilience – connecting people through regenerated local space and tackling inequality
through community collaboration  
5: We will listen to all our communities to hear what their issues and priorities are in order to design local solutions which meet the needs of all our local citizens fairly, with
a focus on those who are most vulnerable, to contribute to improved social outcomes, including assisting alleviation of fuel poverty; reducing health inequalities; and reducing
adverse climate change impacts, while keeping communities updated on action and initiatives being proposed locally
Page 21 of 192

Page 28

We want to ensure connected communities and resilient places across Renfrewshire.  The COVID-19
pandemic highlighted and exacerbated inequalities and exposed the vulnerability of many within our
communities, further emphasising the need to build resilience within our communities and economy. 
Severe weather and climate impacts are already affecting our communities - recent local storms and
flooding events have again shone a spotlight on the importance of resilience and adaptation.   
We will incorporate resilience and adaptation into the Plan for Net Zero and work with local
organisations and communities to identify climate risks to plan and prioritise actions and
interventions that enable us to prepare, respond and recover from severe weather and climate
change impacts.  Some impacts of climate change are already ‘locked in’ and these need to be
managed.  Existing infrastructure and buildings may need to be adapted to prepare for these impacts. 
Early warning systems, such as flood monitoring and forecasting, are key in disaster management, as
well as area-based emergency response plans and continuity plans.  The Plan for Net Zero will enable
local emergency response plans to be prepared in advance and reviewed, communicated and
updated as required with all key stakeholders and our communities. 
Inclusive growth is a key focus - opportunities for community-led activity: creating jobs and
developing local supply chains; re-training and upskilling of local workforce; and creating thriving and
innovative businesses with quality jobs and fair work for everyone.  The Plan for Net Zero will take a
place-based approach, addressing the twin challenge of climate emergency and biodiversity loss,
ensuring the wider benefits and opportunities are distributed fairly across all places and people.
RESILIENT PLACE: We will optimise biodiversity and nature locally to enhance our natural environment and maximise green
economic opportunities, while planning and preparing for impacts of climate change 
PRIORITY AREAS FOR RESILIENT PLACES 
1: ensuring resilience: of our communities, buildings and critical
infrastructure to local climate impacts
2: protecting, restoring and enhancing existing habitats and species:
through prioritised nature-based climate adaptation actions including
protection of ecosystem services, e.g. control of soil erosion and water
regulation
3: a green recovery with community wealth building: capturing the
opportunities of a just transition to net zero, creating local green jobs,
developing sustainable skills and nurturing a wellbeing economy
4: helping nature locally: greening outdoor spaces and building
footprints, as well as installation of bird feeders, hedgehog houses and
insect hotels in public spaces to ensure everyone can enjoy and access
nature
5: improving air quality: through a reduction in emissions from energy,
transport and industry, alongside increased greening of the local
environment
6: sequestration: maximising the carbon absorption potential of our
natural environment through activities such as the restoration of our
peat bogs; tree planting; and improved land practices   
HOW THE COUNCIL WILL LEAD & ENABLE TO ENSURE RESILIENT PLACES:
1: We will work with colleges, schools, universities, local training providers, apprenticeships and staff training, to ensure that the courses and training opportunities exist for
the stable and sustainable, quality jobs that will be created to ensure every person is able to reskill and upskill to participate in a just transition to a net zero
2: We will carry out an inventory of all Council land and assets, including vacant and derelict land, to explore how we can store more carbon on our land than we produce –
identifying appropriate locations and measures to increase the carbon stored on land we own and increase biodiversity on public land assets, e.g. restoration of peat bogs;
greening public spaces; and wild flowering instead of using lawnmowers on verges where safe to do so 
3: We will encourage change - supporting, developing and creating 20-minute neighbourhoods/rural hubs so that citizens can access the services they need locally; ensuring
sustainable transport infrastructure; and increasing local renewable energy generation (both new development and using existing infrastructure).
4: We will produce a proposed pipeline of our major infrastructure projects in order to link with skills transition and local employment opportunities and identify skills gaps,
shortages and requirements ahead of time.  This proposed pipeline will build on work that is already underway to encourage investment in local areas; enable local supply
chain and manufacturing opportunities to be identified; de-risk private sector investment; and bring about regeneration of local areas 
5: We will undertake proactive measures: adopt an early warning system to prepare for extreme weather events such as heatwaves and flooding; identify “grey” and
“nature-based” flood protection measures; put in place local emergency response plans; and undertake a climate risk register of all public assets to ensure all our
infrastructure and buildings, including historic buildings are resilient to the impacts of climate change 
Page 22 of 192

Page 29

In line with our commitment to work towards net zero by 2030, we have made changes within Council operations to reduce carbon emissions and we have also delivered large-
scale projects with regional and national benefits which align with our focus areas.  Click on the links for more details on some of our projects to date: 
The first of a kind in Scotland: AMIDS District Heating Network - provides low carbon heating, cooling and hot water via a district heating network to businesses at the Advanced
Manufacturing Innovation District site in Paisley, with a carbon reduction of over 95% over the 40 years lifecycle of the project and potential to connect other buildings locally. 
Housing Regeneration & Renewal Programme: a £100M ten year programme delivering high quality and energy efficient Council housing throughout Renfrewshire - creating
nicer places to live, bringing down energy bills and alleviating fuel poverty, with associated health and wellbeing benefits.  Follow on works will look at zero energy buildings and
minimising the embedded and operational carbon in new building stock and work is also underway to explore possible district heating options. 
LED Street Lighting Conversion Programme: more than 30,000 streetlights have been converted from sodium lanterns to more energy efficient LED lanterns, which have a longer
lifespan of up to 20 years and lower carbon output - delivering a reduction in street light electricity and carbon consumption of 64%, which is contributing to an 8% reduction in
the Council’s overall carbon consumption. 
Active Travel Improvements: investing in our active travel network to ensure links to key employment centres as well as key destinations between our centres and to improve
health, wellbeing and safety.  We are upgrading existing cycle routes as well as constructing new high quality routes to create a comprehensive network, such as the new Paisley
to Renfrew and Bishopton to Glasgow Airport routes under construction and improving the National Cycle Route 7 which passes through Paisley. 
Public EV Charging Expansion: as well as switching the Council’s cars and light vans fleet to electric vehicles (EVs), we are continuing to add public EV charging bays across
Renfrewshire to support the switch to low emission vehicles.  There are currently 72 public charging bays with a further 54 planned in 2022. 
Reusable Period Products: partnering with a social enterprise to enable everyone in Renfrewshire who uses period products to order reusables – pants, pads and cups – via an
online ordering service.  All period products provided by Renfrewshire Council are biodegradable, recyclable or reusable.  We are also piloting reusable products within schools. 
Educational Settings Meals Services: delivery models have changed with metal cutlery and ceramic plates, and we are at nearly 100% no single use plastics in nursery and primary
estate.  We are also looking at initiatives like bamboo cutlery for secondary schools which by their nature have more of a take-away type service. 
Energy from Waste & Diversion from Landfill: the Clyde Valley Residual Waste Partnership (Renfrewshire, North Lanarkshire, North Ayrshire, East Renfrewshire and East
Dunbartonshire Councils) is the largest, most successful collaboration of a joint waste processing facility in Scotland.  It not only diverts waste from landfill but produces energy
from waste – generating the enough energy to power the equivalent of 32,391 homes and demonstrating the value of reuse and recovery in a circular economy. 
Renfrewshire’s Climate Panel: following the residents’ climate survey, Renfrewshire’s Climate Panel was established.  This is a representative sample of citizens to identify
priority areas, opportunities and explore barriers and solutions associated with our journey to net zero and takes into consideration the voices and views of a range of people
with different needs and experiences. 
Community Climate Fund: awards of up to £3K to community organisations to develop localised, green projects tailored to the needs of individual communities to encourage
participation and raise awareness of the climate emergency within our communities, with initiatives designed and delivered by local residents but supported by the Council. 
New Biodiversity Areas: we are creating 8 new wildlife-friendly environments in 2022, with 33 sites in total over the next 3 years.  The first 8 areas are in Linwood, Erskine,
Johnstone, Inchinnan, Lochwinnoch and Paisley and include roadside wildflower corridors, wildflower areas and new native tree planting. 
Clyde Climate Forest: as part of the Clyde Climate Forest, we will deliver climate and ecological benefits to the Glasgow City Region by planting 10 trees for every man, woman
and child over the next decade.  It is estimated the new urban forest will remove over 55 tonnes of CO2 for every year of its lifespan.
WORK ON THE GO & PROJECTS TO DATE: Since declaring a climate emergency, Renfrewshire Council has already undertaken
many operational changes that are within our control as an organisation, as well as larger scale regional projects   
Page 23 of 192

Page 30

The Plan for Net Zero will be a result of collaborative work - led by the Council, but co-designed with public, private and community organisations working collectively on an area-
wide effort to bring about increased quality of lives while living within a smaller carbon footprint overall.  Consultation with all stakeholders is essential across all phases in the
design and delivery of the Plan for Net Zero.  Two-way communication channels will remain in place as projects and activities are implemented to ensure everyone is informed
of progress and can provide feedback on our collective journey to net zero.   
In addition to ongoing stakeholder engagement, our 5 key actions for Phase 2 are:
1. Detailed Phased Road Map to 2030: we will look strategically and holistically across the whole Renfrewshire area to identify opportunities and solutions and to set
targets, which will be highlighted in the form of a road map with to aid communication with all our stakeholders.  Projected Completion Date: 31st March 2023.   
2. Quantified Delivery Plans: we will set out costed, area based phased delivery plans with benchmark capital costs for each period of the Net Zero road map and will
quantify and consider all impacts of the proposed delivery plans, including those that cannot be monetised (e.g. carbon reduction, fuel poverty alleviation, job
opportunities).  Projected Completion Date: These costed delivery plans will be prioritise and phased between 31st March 2023 and 31st October 2023.   
3. Verifying, adopting and updating our emissions modelling tool: we will quantify the impact of the phased actions, to inform future targets and present data in an
interactive way.  Projected Completion Date: Annual updates from 1st November 2023 as projects and new technologies are delivered.     
4. Developing a carbon budget for Renfrewshire Council: Identifying our emissions by service area will be key in improving our understanding of how our emissions relate
to the services we provide and the reductions we need to aim for in order to adapt to delivering high quality local services in a way that is fit for a resilient, net zero
future.  Projected Completion Date: 6th April 2024.   
5. Developing an Adaptation Plan for Renfrewshire: Developing adaptation solutions and implementing a phased programme of priority actions which are designed to
respond to and address the local impacts of climate change that are already happening, as well as prepare for future climate risks across the Renfrewshire area.  These
actions will be centred around communities, security and resilience, infrastructure and our local environment.  Projected Completion Date: 31st October 2023.     
How will we measure success? It is critical that we have an open and transparent methodology for monitoring, evaluating and reporting progress annually.  Each focus area has
its own metrics of success which can be quantified and measured in isolation, but which also combine to measure our journey to net zero.  We will set annual emissions targets
to align with our phased road map, and which are designed to measure progress to our net zero target.  Metrics of success will be updated as required as new technologies or
improved reporting practices come on stream during the Plan for Net Zero. 
Transparency and openness: ensuring all stakeholders can track progress and access the RenZero modelling tool using an open data platform.  In
recognition that we need coordinated action across areas and sectors to deliver the scale of change required, our emissions modelling tool and reporting
will be used to inform future targets and to present data in an interactive way. 
How will we recognise delivery at a local level? RenZero branding has been developed to visibly highlight projects, activities and initiatives that contribute
to our net zero goal. There are various icons that link climate change issues, action and progress across the 5 focus areas of the Plan.  This branding is for everyone participating
in our journey to net zero. It will be used to highlight action taken by the Council but also can be used by stakeholders to highlight action being delivered by the wider community,
showing how we are all contributing collectively to our net zero goal and allowing us to raise awareness and reach a wider audience. 
NEXT STEPS: We will continue to engage with all our stakeholders as we head into the next phase of the Plan for Net Zero, build
on existing activities and identify new opportunities to accelerate change   
Please get involved and let us know what you think about the areas of focus, issues or opportunities within your community and what you would
like to see locally to shape the Plan for Net Zero: climate@renfrewshire.gov.uk 
Page 24 of 192

Page 31

Adaptation: the process of adjusting economic, social or natural systems in response to current or expected effects of climate change to limit harmful consequences and exploit
beneficial opportunities. 
Carbon Dioxide (CO2): the most abundant greenhouse gas (making up around ⅔ of greenhouse gases).  It is naturally occurring but is also a by-product of human activities such
as burning fossil fuels, land-use changes and other industrial processes and contributes to climate change and global warming.  It is the reference gas against which other
greenhouse gases are measured and therefore has a Global Warming Potential (GWP) of 1.   
Carbon Dioxide Equivalent (CO2e):  a metric measure used to compare the emissions from various greenhouse gases based upon their global warming potential (GWP). 
Carbon Emissions: the release of carbon dioxide (CO2) into the atmosphere. 
Carbon Footprint: the total amount of greenhouse gases that are emitted into the atmosphere from activities each year by a person, building or organisation. 
Carbon Offsetting: the process of compensating for carbon dioxide emissions arising from activities by participating in schemes which remove equivalent levels of carbon dioxide
in the atmosphere, e.g. tree planting, carbon capture, peat bogs. 
Climate Change: refers to any significant change in the measures of climate lasting for an extended period of time, including major changes in temperature, rainfall and severe
weather patterns that occur over several decades or longer. 
Decarbonisation: the reduction or removal of carbon dioxide (CO2) into the atmosphere resulting from human activity, with the eventual goal of minimising emissions as far as
possible. 
Energy Performance Certificate (EPC): gives information on how energy efficient a building (including homes) is; how it could be improved; and an environmental impact rating
to show CO2 emissions.  Buildings are rated on a scale of A to G, with A being the most energy efficient. An EPC is required for new buildings/homes; when you are selling a
building/home; or when renting to a new tenant. 
Fossil fuels: non-renewable energy sources formed from fossilised plants and animals over millions of years such as coals, oil and gas. 
Fuel Poverty: defined as any household spending more than 10% of their income on energy after housing costs have been deducted. 
Greenhouse Gases: any gas that absorbs infrared radiation in the atmosphere and contribute to global warming and climate change. Greenhouse gases include carbon
dioxide, methane, nitrous oxide, ozone, chlorofluorocarbons, hydrochlorofluorocarbons, hydrofluorocarbons, perfluorocarbons and sulphur hexafluoride. 
Greenhouse Gas Emissions: the release of greenhouse gases (GHGs) into the atmosphere. 
Landfill: a waste disposal site in which waste is generally spread in thin layers on an area of land, compacted and covered with soil to decompose, releasing greenhouse gases
into the atmosphere 
Low Carbon: an activity causing or resulting in only a relatively small net release of greenhouse gas emissions (CO2 or CO2e) into the atmosphere. 
Mitigation: activities and intervention which lessen future climate change and its social, economic and environmental consequences by reducing the greenhouse gas emissions. 
Net Zero Emissions: when greenhouse gas emissions are balanced by removals over a specified period. 
Resilience: the capacity to anticipate, prepare for, respond to, absorb and recover from the stresses imposed by climate change from significant multi-hazard threats with
minimum damage to social well-being, the economy and the environment. 
Renewable energy: energy resources that are naturally replenishing such as biomass, hydro, geothermal, solar, wind, ocean thermal, wave action and tidal action. 
Sequestration: the process by which trees and plants absorb carbon dioxide, release the oxygen, and store the carbon.
GLOSSARY OF TERMS: 
Page 25 of 192

Page 32

Page 26 of 192

Page 33

Our Plan for Net Zero
Wewant to end Renfrewshire’s contribution to climate change within a generation. 
We are committed to working towards net zero by 2030 for the whole of
Renfrewshire to ensure a safer, healthier, greener and fairer place for everyone to
live, work and spend time in
RENFREWSHIRE’S PLAN
FOR NET ZERO
PHASE 1:WORKING TOWARDSNET ZERO EMISSIONS BY 2030
PLAN
FOR NET
ZERO
CLEAN ENERGY
SUSTAINABLE
TRANSPORT
CIRCULAR
ECONOMY
CONNECTED
COMMUNITIES
RESILIENT
PLACE
Item 2
PACC230822 Page 27 of 192

Page 34

From evidence and research we know that human activities are the main cause of climate change.  Many of our
actions produce greenhouse gas emissions, raising our planet’s temperature and causing our climate to change. 
Emissions from greenhouse gases from burning fossil fuels, from the way we treat valuable resources as ‘waste’
and from land use changes have all contributed to global warming, and this is the biggest threat to our planet.  Our
response to the climate emergency brings opportunities for our local communities and economy.  It also brings
potential solutions to tackle inequalities, including those exacerbated by the COVID-19 pandemic and the current
cost of living crisis.   
Renfrewshire Council has shown leadership at both a strategic level and operational level to be a driver of change
- declaring a climate emergency in June 2019 and committing to work towards net zero by 2030.  We have
developed strong governance to lead by example and take action to tackle climate change, including establishing a
Climate Change Sub-Committee, now the Planning and Climate Change Policy Board, and committing £1million to
a Climate Change Action Fund supporting innovative climate projects and initiatives across Renfrewshire which
build on transformative projects that the Council have already delivered across our operations.   
When we’re talking about net zero for Renfrewshire, we mean reducing greenhouse gas emissions
to as close to zero as possible (from our energy, resource use, transport, etc.) and locking up
remaining emissions through initiatives like tree planting, restoring peat bogs and carbon capture
and storage schemes.  This makes the balance of our emissions ‘net’ zero. 
This Plan is Council-led but is for the whole Renfrewshire area and we need everyone to participate to achieve our
ambitions.  Moving towards net zero will transform our communities, our economy and how we deliver our
services, so engagement is key to ensure all voices are heard.    In developing this Plan, we worked hard to gather
different views and ideas with a Climate Survey, a Business Survey, establishing our representative citizens Climate
Panel and working with local public, private and third sector and community planning partners to get everyone
involved.   
Throughout this summary document and the full Plan, you will notice references to ‘we’ – this means
Renfrewshire Council as a lead partner and producer of this Plan, but it also means Renfrewshire stakeholders,
communities, citizens and the people we’ve been speaking to as we pull together this Plan and shape our route
forward.   
To work collectively to reduce emissions, it is important to have a robust evidence base.  Our greenhouse gas
emissions baseline for Renfrewshire Council as an organisation and Renfrewshire as an area highlights progress
made so far and the gaps we need to fill with actions reach net zero.  Renfrewshire Council makes up around 2.5%
of the area’s total emissions, with buildings we are responsible for being the main source of emissions (67%),
followed by transport (17%) and waste collection (8%).  For the Renfrewshire area, transport is the biggest source
of emissions (34%), with residential energy use and commercial and industrial energy use both on 29%.  The Plan
for Net Zero will identify and prioritise action across all of the different sectors in collaboration with all of our
stakeholders, and signpost to information, advice and support (including financial support) to enable change to
work towards net zero.         
We will work together with partners, businesses, local people and communities to target 5 focused outcome areas,
creating opportunities for all.  The key focus areas of activity which we will progress, lead and enable are:
o Clean Energy: we will minimise energy demand, maximise energy efficiency and transform our energy
systems to deliver clean, affordable energy for all
o Sustainable Transport: we will maximise sustainable transport opportunities to deliver an inclusive,
affordable transport system that provides choice for all
o Circular Economy: we will make Renfrewshire a circular economy society: minimising waste and
maximising reuse, recycling and recovery of resources rather than treating them as waste
o Connected Communities: we will empower our communities by ensuring an inclusive and just
transition to net zero with social justice and health and wellbeing at its core for current and future
generations
o Resilient Place: we will optimise biodiversity and nature locally to enhance our natural environment
and maximise green economic opportunities while planning and preparing for impacts of climate
change 
EXECUTIVE SUMMARY
Page 28 of 192

Page 35

There will always be emissions that we are unable to remove, such as those associated with medicines and
anaesthetics.  Even a best case scenario has shown that both Renfrewshire Council and Renfrewshire area would
have remaining emissions that would need to be offset.  The Plan for Net Zero aims to set out how we can take
action collectively to reduce emissions to as low a level as possible, leaving achievable emissions levels to offset.   
There is not a ‘one size fits all’ solution across Renfrewshire – we need to look on an area by area, community by
community basis to tailor solutions to meet local needs and make sure that no one is left behind.  We need to
identify and understand barriers to change, so that we can find solutions and we need to transition in a way that is
just, creates opportunities equitably and creates a greener, fairer, sustainable way of life for all our citizens,
communities and local businesses. 
We want everyone to be involved - our engagement will be ongoing to raise awareness and encourage
conversations with all stakeholders as the Plan is implemented.  We will develop a communications plan to ensure
a coordinated approach for ongoing engagement to ensure people can follow progress and participate in climate
activities across Renfrewshire; continue effective governance in partnership with public, private and community
organisations; and develop visualisation tools to model, monitor and report progress.   
We will welcome comments and feedback from all citizens, communities and stakeholders on Phase 1 of the Plan
for Net Zero.  This will inform Phase 2 of the Plan for Net Zero – which will outline our route map to net zero and
the phased actions, projects and interventions that will enable us to reach our target. 
The change needed to reach net zero is unprecedented. It will require long-term financial resources and large-scale
investment. It will require government at all levels to redirect and, in some cases, reprioritise existing finance to
support the scale and pace of change required and align investment with climate priorities.  The delivery of high
quality public services remains a priority - with the transition to net zero and a green recovery from COVID-19
bringing opportunities for increased efficiencies and potential service improvements through rebuilding and
designing better systems and putting things back together differently.     
In addition to traditional avenues of funding, it will be key to explore more innovative and collaborative ways to
finance climate action across stakeholders, including new business models; joint ventures and partnership projects;
and potential crowdsourcing initiatives such as community municipal bonds.  Action is already being taken across
many stakeholders, with funding allocated to committed and desired carbon reduction and climate resilient
interventions, but many other potential projects will require feasibility studies or business cases to determine their
viability and for funding to be secured to make them happen, particularly in the case of larger-scale projects.     
This approach, pipeline of projects and investment in a net zero society and green economy also brings
opportunities for the local workforce and market confidence for supply chains and manufacturing through the
implementation, installation, construction and maintenance of projects.  We need to identify and address skills
gaps and ensure a proactive approach to the upskilling, reskilling and training required to ensure this large-scale
job creation and sustainable employment opportunity is retained locally as much as possible; to limit the transition
risks; and ensure that skills interventions lead to a more inclusive and productive, resilient and future-proofed
economy. 
We will require ambition, drive and collective local action beyond the national contribution in
order to work towards net zero by 2030.  This will be achieved through targeted action across our
5 focus areas: clean energy; sustainable transport; circular economy; connected communities;
and resilient place. 
How will we recognise delivery at a local level? RenZero branding has been developed to
visibly highlight projects, activities and initiatives that contribute to our net zero goal. There
are various icons that link climate change issues, action and progress across the 5 focus areas
of the Plan.  This branding is for everyone participating in our journey to net zero. It will be
used to highlight action taken by the Council but also can be used by stakeholders to highlight
action being delivered by the wider community, showing how we are all contributing
collectively to our net zero goal and allowing us to raise awareness and reach a wider audience. 
Please get involved and let us know what you think about the areas of focus, issues or opportunities
within your community and what you would like to see locally to shape the Plan for Net Zero: 
climate@renfrewshire.gov.uk 
Page 29 of 192

Page 36

What is climate change? The increased concentration of greenhouse gases in the earth’s atmosphere is directly
linked to the rise in average global temperatures on earth1 and is resulting in global climate change. 
Many of our actions produce greenhouse gas emissions, raising our planet’s temperature and causing our climate
to change.  Emissions from greenhouse gases from burning fossil fuels, from the way we treat valuable resources
as ‘waste’ and from land use changes have all contributed to heating the planet.  Fossil fuels are finite resources
such as coal, oil and natural gas which have been formed over millions of years from decayed remains of prehistoric
plants or animals.  Burning fossil fuels releases carbon dioxide and other greenhouse gases, making them the
primary contributor to climate change and global warming.   Methane (which is the primary component of natural
gas) is responsible for more than 25% of the warming we are experiencing today.   
Carbon dioxide (CO2) is the most abundant greenhouse gas (making up around ⅔ of greenhouse gases)
and is largely the product of burning fossil fuels. 
Global surface temperature has increased faster since 1970 than in any other 50-year period over at least the last
2,000 years, resulting in more severe and more frequent extreme weather events such as heatwaves, droughts,
flooding and wildfires.  It has also led to sea level rises and nature loss in every region across the globe.  In Scotland,
we’ve seen our warmest years and increased rainfall levels – this is expected to continue and get more intense. 
Climate change cannot be stopped - some of the damage is already ‘locked in’.  But taking measures to minimise
our greenhouse gas emissions would limit further climate change.  There are changes we can all make to prevent it
getting worse and to help us cope with the damage that has already been done. 
Climate change is happening in Scotland, and is happening in Renfrewshire, and we’re already seeing
the impacts locally. 
1 IPCC: The Intergovernmental Panel on Climate Change – over 200 scientists across 65 countries working together to understand, measure and model
global warming 
BACKGROUND TO THE CLIMATE EMERGENCY: We know that human activities are the
main cause of climate change.  Human influence has warmed the climate at a rate not
seen in at least the last 2,000 years1 
The Coats Observatory in Paisley opened in 1883 and
includes a weather station that has been recording local
weather daily from 1885.   
This provides us with an unbroken record of weather
data, including average local temperature for each year
since 1885 (figure 1, left) until March 2020 when, as a
result of the pandemic, data retrieval was interrupted as
it was unable to be collected due to lockdown. 
From this data, Paisley’s climate stripes were created
(figure 2, below).  This shows the progressive heating of
our local area in a single image.
Figure 1: Coats Observatory average local temperature,
1885 to March 2020, courtesy of the University of
Reading
In both figure 1 and figure 2, each stripe represents the
average temperature for a single year, relative to the
average temperature over the period as a whole.   
Shades of blue indicate cooler than average years,
while reds show years that were hotter than average. 
The increasing intensity and occurrence of red stripes
on the right-hand side of the graphics clearly highlight
how average temperatures have risen in our local area
and that this has become more frequent and extreme
in the last 25 years. 
Figure 2: Paisley’s Climate Stripes, courtesy of the
University of Reading
Page 30 of 192

Page 37

Why is it called a Climate Emergency? Ahead of COP26 in Glasgow in 2021, the UN Secretary General referred to
the climate emergency as a ‘code red for humanity’.  Rising global temperatures will see more floods, storms and
heatwaves; erosion of coastlines; and globally, less land will be fit for living and growing food, leading to fresh water
and food supply shortages, and resulting in even more species struggling to survive.   
‘Climate emergency’ refers to the urgency of the situation: if we want to preserve a liveable planet,
we all need to take action. 
A 2°C global warming increase, represents a critical threshold, where it is predicted that tolerance for agriculture
and for health will be reached.  The IPCC report2 predicts that global warming of both 1.5°C and 2°C will be exceeded
this century unless massive reductions in greenhouse gas emissions occur in the coming decades.  Climate change
cannot be stopped, but its impacts can be slowed, and we can avoid or limit some of the worst impacts.   
All of us have been impacted by the COVID-19 pandemic over the last two years.  Our recovery from the pandemic
must also respond to the climate emergency and embrace the opportunities to rebuild and design better systems
and put things back together differently to ensure the benefits of a transition to net zero are shared fairly.           
We can all act now to reduce our emissions and prepare for the impacts of climate change in order to protect all
that we love.  Every action we take to cut our emissions will reduce warming and create a greener, cleaner, fairer,
healthier and more sustainable way of life for everyone.   
Every year we report our progress to the Scottish Government on Renfrewshire Council’s own carbon footprint and the
measures we are putting in place to reduce it.  The most recent report can be found here: Public Bodies Climate Change
Duties Draft Report 2021-22.  Historic reports for Renfrewshire Council can be found here.
2 https://www.ipcc.ch/sr15/ 
Since Renfrewshire Council declared a climate emergency in June 2019, a Cross-Party working group published its
recommendations and many of these actions have been progressed ahead of the formal Plan for Net Zero being
published.  Actions included setting up a Climate Change Sub-Committee (now the Planning and Climate Change
Policy Board) and committing £1million to a Climate Change Action Fund to support innovative climate projects
and initiatives which could be implemented and replicated across the Renfrewshire area, including: 
RENFREWSHIRE COUNCIL: LEADING BY EXAMPLE
Renfrewshire Council’s Carbon Management Plan 2014/15 - 2019/20 set a target to reduce its total annual
carbon footprint by 19,389 tCO2e by the end of financial year 2019/20, using a baseline of financial year
2012-13.  In January 2021, the completed Carbon Management Plan reported a total reduction of 31,818
tCO2e equating to a 60% reduction in carbon emissions across a range of areas including energy, water
conservation, fleet replacement to low emission vehicles, increased recycling and reducing the quantity of
waste sent to landfill and behaviour change across the organisation. 
o the purchase of new electric light commercial vehicles as part of the ongoing Council
fleet replacement programme (30% of the Council fleet is now electric) 
o investigating opportunities for a large-scale solar farm on the Moss Road former
landfill site 
o our residents’ Climate Survey, including weighting and analysis to ensure a
representative view as part of the evidence base for Renfrewshire’s Plan for Net Zero. 
A representative sample of residents who responded then formed the Climate Panel
o developing a local response to ensure resilient town centres by addressing current and
issues within our towns and local centres in Renfrewshire
o establishing a Community Climate Fund, providing community organisations up to £3K
for localised green community projects initiatives
o developing our strategic active travel network to better connect communities to
places of work, study and town centres
o baselining Renfrewshire’s emissions to see where we’ve come from, where we are
now and future projection scenarios to 2030 to see the actions we need to take   
Page 31 of 192

Page 38

We want to bring everyone with us, but we understand that people are all at different stages of the climate journey. 
We have been working across all our stakeholders in order to get everyone involved – residents, communities, local
organisations, public, private and third sector and community planning partners.  It is also key to have a focus on
traditionally under-represented groups, to ensure all voices are heard in the design and delivery of the Plan for Net
Zero.
Our residents Climate Survey received 1,758 responses by post, email and
online.  The results were analysed and weighted to ensure a representative
view to form part of the evidence base for the Plan for Net Zero. 
Over 99% of respondents were aware of climate change, 86% believe we
are facing a climate emergency and 96% believe it is a serious or fairly
serious threat to the world. 
9 in 10 respondents believed that action can be taken to tackle climate change and
believed our top priorities should include:
o investing in green economy/green jobs (19%)
o protecting the natural environment/biodiversity (18%)
o reducing the carbon emissions related to food production (17%)
o reducing transport related emissions (17%) 
Respondents believed the following would make the biggest
impact:
o supporting renewable energy generation scored highest at 62%, followed by
o planting more trees (54%), and
o providing better public transport and safer walking/cycling routes
o adopting policies which safeguard and enhance nature and biodiversity in
Renfrewshire (50%)
o developing ways of heating buildings and homes other than through gas central
heating (50%)
o retrofitting homes to become more energy efficient (48%) 
The importance of outdoor spaces was clear in the responses.  97% ranked access to and quality of
greenspace very important or quite important, with only 3% responding that it was not really important
or not at all important.
Respondents believed that small individual actions, repeated on a large scale, can have a big impact in tackling climate
change: 85% agreed that their actions can help tackle climate change; 83% agreed their actions can help protect plants,
animals and other wildlife; and 83% agreed that reducing their own impact on the environment is a personal priority.
WHAT YOU TOLD US: We have been carrying out extensive engagement across all our
stakeholders to ensure all voices are heard and no one is left behind 
The Survey also reinforced areas where people need support to enable them to make changes:
o Only 14% fully agreed that they had the information and tools needed to help tackle climate
change, with 44% agreeing somewhat, and 
o Only 23% fully agreed that they knew the changes they needed to make to help tackle climate
change, with 48% agreeing somewhat 
and also highlighted the barriers that prevent people from making changes:
o 40% thought that making changes would cost them more 
o 21% stated a lack of resources or facilities in Renfrewshire to support the changes people 
want to make 
o 21% stated that they didn’t know where to start 
Page 32 of 192

Page 39

We want to bring everyone with us, and to ensure that all voices are heard in the design and delivery of the Plan for
Net Zero. Our Climate Panel was formed, made up of a representative sample of Renfrewshire citizens, to look at
climate issues, discuss how this affects people locally and help identifywhat interventions are needed and what actions
can be taken to collectively support Renfrewshire’s drive towards net zero by 2030. 
The first session was held in November 2021, with3 further sessionsin December 2021, January 2022 and March 2022.
The sessions are held over Microsoft Teams, and each month there are 2 sessions on the day – one in the afternoon
and one in the evening – to ensure as many people as possible are able to attend.
One Panel member said: “I put my name forward to be part of the Climate Panel because I have an
interest in the environment both locally and internationally, which includes keeping my local area
tidy and recycling where possible.
I want to encourage Renfrewshire Council to provide more safe cycle routes and would like to
encourage them to provide access to e-bikes for all too.”
“I realise I am asking for a lot from my membership of the Climate Panel, but I have to start somewhere,
and I might as well be ambitious for the sake of my children and grandchildren.”
A consistent message from the Climate Survey, the Climate Panel and engagement with local organisations, was that
people don’t know where to start and would like to know what can make the biggest impact.  We will address this
under each outcome area, as well as including a section on impartial advice and support that is available to residents,
communities, SMEs,businesses, private, public and 3rd sector organisations.
YOU SPOKE, WE LISTENED: A representative sample of those who responded to the
Climate Survey then formed our Climate Panel
People discovering new
parts of the area due to
lockdown – first time we
all had a chance to take a
breath and appreciate
local green space
This stamp can be found in all 5 of the outcome areas, highlighting priorities which were
raised by our representative Climate Panel and how we will address these.
What are the hardest hitting
actions/would have the biggest
impact overall?  Is it how we
manage our waste, or should we
concentrate on consuming less?
Or do we need to think about
changing how we use transport?
Page 33 of 192

Page 40

We want to end Renfrewshire’s contribution to climate change within a generation.  Renfrewshire’s Plan for Net Zero is
Council-led but is for the whole Renfrewshire area - we need everyone to participate to achieve our ambitions
collectively.     
We know that it is not a ‘one size fits all’ solution across Renfrewshire – we need to look on an area by area, community
by community basis to tailor solutions to meet local needs and make sure that benefits are shared equally and fairly
across everyone in society and that no one is left behind.    The Plan for Net Zero is not just about future injustices – it
includes the need to address and deal with existing injustices and improve the lives of all our citizens – including providing
solutions to key issues, such as impacts of the cost of living crisis on everyone’s lives. 
What is Net Zero? When we’re talking about net zero for Renfrewshire, we mean reducing greenhouse gas emissions
to nearly zero – from our energy, resource use, transport, etc. - and locking up remaining emissions that we are unable
to remove (e.g. those associated with anaesthetics, medicines, etc.) through initiatives like tree planting, peatbogs and
carbon capture and storage schemes.  So the balance of our emissions is ‘net‘ zero. 
The impacts of the COVID-19 pandemic on people’s lives and livelihoods have been enormously difficult. As with the
pandemic, climate change impacts those who are most vulnerable disproportionately.  The pandemic also highlighted
people’s ability to adapt – we have a real opportunity to build on positive behaviours which resulted from the pandemic
(e.g. shopping locally to support local businesses, daily exercise embraced and maintained, a reduction in food waste) in
order to reduce our emissions, support our local economy and make our communities safer, more attractive and
healthier places to spend time in.   
We need to transition to net zero in a way that is just, removes social stigmas and ensures social justice - creating
opportunities and a greener, fairer, sustainable way of life for all our residents, communities and local businesses,
ensuring we don’t ‘punish’ any groups or sectors or make lifer harder for those already experiencing difficulties.  We also
need to identify and understand barriers to change, so that we can find solutions to enable change. 
We will work together with partners, businesses, local people and communities to target 5 focused outcome areas,
creating opportunities for all.  The key focus areas of activity which we will progress, lead and enable are:
o Clean Energy
o Sustainable Transport
o Circular Economy
o Connected Communities
o Resilient Place
SCOTLAND’S PROGRESS TO DATE 
RENFREWSHIRE’S PLAN FOR NET ZERO: We are working towards net zero emissions by
2030.  The Plan for Net Zero will transform our communities and economy, and these
transformations must be done with our communities and not to them 
It can seem overwhelming when hearing of targets and the scale of change that is needed to
reach net zero, but nationally we have already achieved so much together.  
➢ Scotland has cut greenhouse gas emissions by more than half since 1990 and since 2008 we
have decarbonised faster than any country in the G20
➢ We exceeded world leading targets for 2020 early (and new targets set) relating to:
- reduction in emissions by 42% by 2020 (reached 48% by 2014)
- reducing final demand for energy by 12% by 2020 (exceeded by 2014)
- 0.5GW of community owned energy by 2020 (exceeded by 2015)
➢ In 2020, renewable sources generated the equivalent of nearly 99% of Scotland’s gross
annual electricity consumption
➢ Scotland’s tree planting makes up 80% of the UK total and last year continued on a massive
scale, despite COVID-19 and ongoing restrictions
➢ Landfill waste has decreased by almost 50% in under 10 years    (1990-2019)
EMISSIONS
DOWN BY
51.5%
Page 34 of 192

Page 41

In line with our commitment to work towards net zero by 2030, we have made changes within Council operations to
reduce carbon emissions and we have also delivered large-scale projects with regional and national benefits which align
with our focus areas.  Click on the links for more details on some of our projects to date: 
The first of a kind in Scotland: AMIDS District Heating Network - provides low carbon heating, cooling and hot water via
a district heating network to businesses at the Advanced Manufacturing Innovation District site in Paisley, with a carbon
reduction of over 95% over the 40 years lifecycle of the project and potential to connect other buildings locally. 
Housing Regeneration & Renewal Programme: a £100M ten year programme delivering high quality, energy efficient
Council housing across Renfrewshire - creating nicer places to live, reducing energy bills and alleviating fuel poverty, with
associated health and wellbeing benefits.  Follow on works will look at zero energy buildings and minimising embedded
and operational carbon in new building stock and also to explore possible district heating options. 
LED Street Lighting Conversion Programme: over 30,000 streetlights have been converted from sodium to more energy
efficient LED lanterns, with a longer lifespan of up to 20 years and lower carbon output - delivering a reduction in street
light electricity and carbon emissions of 64% - an 8% reduction in the Council’s overall carbon consumption. 
Active Travel Improvements: investing in our active travel network to ensure links to key employment centres and key
destinations between our centres and improving health, wellbeing and safety.  We are upgrading existing routes as well
as constructing new high quality routes - creating a comprehensive network, such as the new Paisley to Renfrew and
Bishopton to Glasgow Airport routes and improving the National Cycle Route 7 which passes through Paisley. 
Public EV Charging Expansion: as well as switching the Council’s cars and light vans fleet to electric vehicles (EVs), we
are continuing to add public EV charging bays across Renfrewshire to support the switch to low emission vehicles.  There
are currently 72 public charging bays with a further 54 planned in 2022. 
Educational Settings Meals Services: delivery models have changed with metal cutlery and ceramic plates, and we are
at nearly 100% no single use plastics in nursery and primary estate.  We are also looking at initiatives like bamboo cutlery
for secondary schools which by their nature have more of a take-away type service. 
Energy from Waste & Diversion from Landfill: the Clyde Valley Residual Waste Partnership (Renfrewshire, North
Lanarkshire, North Ayrshire, East Renfrewshire and East Dunbartonshire Councils) is the largest, most successful
collaboration of a joint waste processing facility in Scotland.  It not only diverts waste from landfill but produces energy
from waste – generating the enough energy to power the equivalent of 32,391 homes and demonstrating the value of
reuse and recovery in a circular economy. 
Reusable Period Products: partnering with a social enterprise to enable everyone in Renfrewshire who uses period
products to order reusables – pants, pads and cups – via an online ordering service.  All period products provided by
Renfrewshire Council are biodegradable, recyclable or reusable.  We are also piloting reusable products within schools. 
Renfrewshire’s Climate Panel: following the residents’ climate survey, Renfrewshire’s Climate Panel was established. 
This is a representative sample of citizens to identify priority areas, opportunities and explore barriers and solutions
associated with our journey to net zero and takes into consideration the voices and views of a range of people with
different needs and experiences. 
Community Climate Fund: awards of up to £3K to community organisations to develop localised, green projects tailored
to the needs of individual communities to encourage participation and raise awareness of the climate emergency within
our communities, with initiatives designed and delivered by local residents but supported by the Council. 
New Biodiversity Areas: we are creating 8 new wildlife-friendly environments in 2022, with 33 sites in total over the
next 3 years.  The first 8 areas are in Linwood, Erskine, Johnstone, Inchinnan, Lochwinnoch and Paisley and include
roadside wildflower corridors, wildflower areas and new native tree planting. 
Clyde Climate Forest: as part of the Clyde Climate Forest, we will deliver climate and ecological benefits to the Glasgow
City Region by planting 10 trees for every man, woman and child over the next decade.  It is estimated the new urban
forest will remove over 55 tonnes of CO2 for every year of its lifespan. 
WORK ON THE GO & PROJECTS TO DATE: Since declaring a climate emergency,
Renfrewshire Council has already undertaken many operational changes that are
within our control as an organisation, as well as larger scale regional projects 
Page 35 of 192

Page 42

Scotland has set targets to reduce greenhouse as (GHG) emissions to net zero by 2045 under the Climate Change
(Emissions Reduction Targets)(Scotland) Act 2019.  Working towards net zero by 2030, Renfrewshire Council will be
placed well ahead of national targets.  We will require significant ambition, drive and action beyond the national
contribution in order to achieve our target, but we believe that by working together we can rise to this challenge. 
In order to prioritise, it is critical to identify key sources of emissions to be targeted, to enable us to
monitor progress using an open and transparent process. 
To measure where we started from (financial year 2014-15); where we are now; and the key areas we need to focus on
to reach net zero, we completed an emissions baseline and trajectory to 2030 for the Renfrewshire Council area as a
whole. 
Emissions were broken down by sector (transport, residential,
etc.) and by fuel type (electricity, gas, road fuel) to identify our
key emission sources and so we can model the impact of
decarbonisation actions we take. 
Our “where are we now” year is financial year 2018-19  - this is
the most recent year that did not include the effects of the
COVID-19 pandemic.  The pandemic had significant effects on
emissions and this data would have skewed results, including
future projections.   
Data shows transport3 is currently the biggest source of
emissions in Renfrewshire at 34%, Figure 3 (left). 
Total emissions in Renfrewshire decreased by 2% from 2014-15 to
2018-19 (figure 4).  Residential electricity emissions decreased by 19%,
but these savings were negated by increases in other sectors. 
The Plan for Net Zero will identify and prioritise action across all of the
different sectors in collaboration with all of our stakeholders, and
signpost to information, advice and support to enable change to
work towards net zero. 
Two scenarios to 2030 were modelled: a Business as Usual (BAU)
“worst case scenario” if no further action is taken; and a “tailwind
scenario” if significant action is taken at the “best case” level in line
with national net zero targets (net zero by 2045), figure 5. 
Remaining emissions in 2030 under the tailwind scenario for
Renfrewshire are 406ktCO2e.  These emissions would need to be
offset for each year that emissions remain above net zero after the
target date.   
The action and scale of change needed to reach net zero is
unprecedented.  For context, offsetting 406ktCO2e annually is
equivalent to planting 946 hectares of trees every year (3.6% of
Renfrewshire’s total landmass), so we need to take action collectively
in order to reduce emissions as low as possible, leaving achievable emissions levels to offset. 
3 Although Glasgow Airport is situated within the Renfrewshire Council area, emissions from this source are not included locally, but instead are included within
national climate targets
5 CO2e (carbon dioxide equivalent) measures emissions from various greenhouse gases by converting to CO2 on the basis of global warming potential 
Figure 3: Estimated ktCO2e5 emissions for the Renfrewshire area 
as a whole, 2018/19 
Figure 4: Emissions for Renfrewshire area (2014/15-2018/19) 
Figure 5: Tailwind and BAU projection for Renfrewshire area to 2030
WHERE ARE WE NOW – RENFREWSHIRE AREA AS A WHOLE: We are committed to working
towards net zero emissions.  In order to work collectively to reduce emissions, it is
important to know where we are starting from as an evidence base.   
Page 36 of 192

Page 43

In order to be open and transparent in our progress to net zero, we carried out emissions baselining for Renfrewshire
Council as an organisation as well as for the Renfrewshire Council area as a whole – looking at the buildings we own, the
resources we use, the services we provide, how we travel and the open spaces we maintain.   
Our baselining evidence has shown that Renfrewshire Council makes up only 2.49% of the emissions of the
Renfrewshire Council area as a whole. 
Although the vast majority of emissions are out with the control of the Council, we can pilot projects which can be
replicated by other organisations; signpost residents and businesses to advice and support; share knowledge and lessons
learned; and facilitate and enable change through action and initiatives, policies and strategies. 
The tailwind scenario for both Renfrewshire Council as an organisation, and the Renfrewshire area as a
whole, highlights further and increased local action is required in order to work towards net zero by 2030. 
This will be achieved through targeted action across our 5 focus areas.
Figure 8: Tailwind and BAU projection for Renfrewshire 
Council to 2030
WHERE ARE WE NOW – RENFREWSHIRE COUNCIL AS AN ORGANISATION: We are also
working towards to net zero emissions by 2030.  In order to lead by example; share
knowledge and learning; and develop projects to reduce emissions, it is important
to monitor and share our progress as an organisation.   
Figure 6: Estimated emissions % for Renfrewshire 
Council, 2018-19
Renfrewshire Council’s greenhouse gas emissions for 2018-19 were
estimated to be 22.3ktCO2e.  Renfrewshire Council emissions are dominated
by buildings that we are responsible for (67%).  The most significant
emissions source is school buildings (47%) which is also the largest element
of our estate, with community buildings at 13%, operational buildings (5%)
and other buildings (2%).  This Council emissions data does not currently
include facilities managed by OneRen (such as leisure facilities, museums
and libraries).  Renfrewshire Council and OneRen will work in partnership on
emissions reduction opportunities and the data for the buildings managed
by OneRen will be included in annual emissions monitoring.   
The majority of the remaining Council emissions are linked to road transport
- Council fleet (17%); waste collection (8%); and Council business travel
(before pandemic behaviour changes) at 2%. 
Figure 7: Changes in Renfrewshire Council
emissions, 2014-15 to 2018-19 
Remaining emissions in 2030 under the tailwind scenario for
Renfrewshire Council are 11.3ktCO2e.  These emissions would
need to be offset for each year that emissions remain above net
zero after the target date.   
The Council’s Carbon Management Plan 2014-15 to 2019-20 saw
us remove 31,818tCO2e in 6 years, so we know that we can take
massive strides in a relatively short period of time.  Reducing
Council emissions to reach net zero will be a challenge, but with
knowledge gained to date and advances in technology we know
can do this.
Total Council emissions decreased by 39% between 2014-15 and 2018-
19.  A significant factor was the streetlighting LED conversion,
completed 2017, leading to a 79% reduction in streetlighting emissions. 
The COVID-19 pandemic is expected to initially show a sharp decrease
in energy emissions for the Council, particularly during lockdown when
buildings were unoccupied.  However, we expect sharp increases in
transport emissions associated with frontline services, e.g. waste
collection crews using additional vehicles to maintain collections due to
limiting operatives in the cab; the delivery of meals to vulnerable
residents; and the need for increased ventilation in schools meaning
that heating was required earlier in the year to maintain thermal
comfort for pupils and staff. 
Page 37 of 192

Page 44

The majority of Renfrewshire’s homes and businesses, including the Council estate and Council housing stock, are
currently heated and powered by fossil fuels which contribute to climate change.  Many homes and buildings are also
older and/or less well insulated, making them harder and more expensive to heat, which increases carbon emissions and
exacerbates issues with fuel poverty.   
It is vital that we cut emissions from Renfrewshire’s homes and businesses, in a way that ends fuel poverty,
ensures warm homes and buildings and develops a thriving, wellbeing economy. 
Renfrewshire’s energy consumption makes up more than half (58%) of the area’s total emissions:
o electricity to power homes and businesses totals 20% of our total emissions (7% residential and
13% commercial and industry)
o gas and other fuels for heating homes and businesses total 38% of our total emissions (22%
residential and 16% commercial and industry)
o Latest figures show that 22% of households in Renfrewshire are in fuel poverty4  
o 89% of Renfrewshire’s homes use mains gas as their primary source of heat (higher than the
Scottish average of 79%)
o Council housing stock currently makes up nearly 15% of the overall housing in Renfrewshire 
WHAT DOES CLEAN ENERGY LOOK LIKE FOR RENFREWSHIRE? 
Energy costs are increasing at a time when we are recovering from the pandemic, and many citizens are experiencing a
cost-of-living crisis.  As a Council, we need to take this into account in everything we do.  The Plan for Net Zero will outline
a transition to clean energy systems to provide reliable, secure, affordable energy for everyone. 
The way we generate, supply and use energy needs to change.  We need to move from traditional
models of energy generation and supply to a more effective and efficient use of energy at a local level. 
Many of the energy choices that will drive our energy transition are made locally – by local people,
local businesses, local communities and Local Government. A decentralised, more local model of
energy generation and supply will ensure that systems are tailored to meet local needs and associated
benefits will stay within our communities, including affordable energy for all, local job creation and
upskilling of workers.   
The Plan for Net Zero will follow the energy hierarchy and this will be applied to the Council estate,
as well as identifying opportunities in our communities and for local businesses – reducing the amount
of energy used in the first place; maximising energy efficiency of all buildings; then meeting the
remaining demand primarily by renewable and low carbon energy systems, using energy storage to
optimise efficiency and ensure resilience.  Traditional sources of energy will be a last resort and the
carbon associated will be offset locally to compensate.  This will make our homes and buildings
warmer, greener and more efficient with an affordable, secure energy supply and will remove poor
energy efficiency as a driver for fuel poverty.   
4 Fuel poverty is defined as any household spending more than 10% of their income on energy after housing costs have been deducted.  The Scottish average is 24%.
PRIORITY AREAS FOR CLEAN ENERGY
1: minimising energy demand: reduce energy waste to reduce demand at source
2: maximising energy efficiency: improved energy efficiency across all homes and buildings to reduce consumption
and remove poor energy efficiency as a driver for fuel poverty
3: maximising sustainable energy generation: decarbonise the energy we use for heating, power and transport -
matching local demand and local supply with community involvement and using energy storage to optimise the
amount of locally generated energy able to be used locally
4: alleviating fuel poverty: through improved energy efficiency and the provision of affordable, low carbon heat and
power, ensuring warm homes to improve wellbeing and reduce health inequalities 
5: energy security and resilience: a managed energy transition to ensure resilient communities, with secure and
affordable energy supplies for everyone 
6: offsetting: conventional sources of energy as a last resort, with local carbon offsetting to compensate   
CLEAN ENERGY: We will minimise energy demand, maximise energy efficiency and
transform our energy systems to deliver clean, affordable energy for all 
Page 38 of 192

Page 45

We need significant emissions reductions in how we generate, supply and use energy to meet our net zero
target.  It will be challenging, but transitioning to clean energy systems also brings new local opportunities
that are smart, sustainable, fit for the future and improve local lives. 
Our clean energy transition will place people at its centre - considering the needs of different groups and engaging with
stakeholders to identify partnership working opportunities.  Low regret solutions and flexibility will reflect the needs of
local areas and ensure local solutions are relevant to local characteristics and those that live and work there.  We will
prioritise projects that can be scaled and replicated across the Council area, and those which use existing infrastructure,
e.g. waste heat recovery, as well as new development. 
The Plan for Net Zero will link supply and demand of power, heat and transport in collaboration with all
local stakeholders to reduce reliance on fossil fuels, support the growth of net zero local economies and
tackle climate change while addressing specific energy issues faced locally in our communities. 
WE WILL work with all public partners and local agencies as a priority to deliver an area-wide energy awareness
campaign ensuring impartial advice and support (including financial support) is in place and easily accessible for
everyone - with more affordable energy to ensure warm homes; reducing energy costs; and alleviating fuel poverty
specific priorities as part of the Plan for Net Zero.
YOU TOLD US: it was hard to know where to start when it comes to changing energy suppliers; looking at
energy efficiency improvements; changing your heating; or looking at renewables . You wanted to know
what help is out there, including financial assistance and grants. 
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO CLEAN ENERGY:
1: We will undertake a strategic review of all the buildings we own to ensure more efficient use: minimising energy
consumption; reducing energy waste; maximising energy efficiency; and ensuring all public and community buildings
have renewables where technically feasible - monitoring and sharing our progress to ensure transparency and
facilitate replication by others
2: We will generate the equivalent of 100% of the Council’s public buildings’ power needs and ensure 100% of Council
public building heating requirements are carbon neutral by 2030
3: We will implement measures in Council housing stock to reduce carbon emissions to by 68% (from 2020 levels)
and work towards ensuring all Council housing stock has an EPC of B by 2030 where feasible.  Where possible we will
work with private homeowners within mixed tenure blocks to help them to participate and benefit from Council
energy efficiency improvement programmes and will work with owner-occupiers and the private rented sector to
share learnings and identify opportunities to reduce costs for all through economies of scale 
4: We will increase energy security and resilience - mapping strategically across Renfrewshire to identify local energy
solutions for heat, power and transport on an area-by-area basis.  This will accelerate deployment of local energy
systems where local supply meets local demand; using input from stakeholder engagement to ensure we tailor
solutions to respond to and meet our communities’ social and environmental needs, including alleviation of fuel
poverty and will ensure the benefits of local energy systems stay within our communities
5: We will work with regional partners to attract large-scale public and private investment to ensure community
wealth building, quality green jobs and result in inclusive, empowered, resilient, sustainable communities with a
reduced reliance on fossil fuels, for example increased community and locally owned energy
Think globally, act locally: Small individual actions, repeated on a large scale, have a big impact in tackling climate
change. Reducing energy waste at source to reduce energy demand is the most effective way to reduce costs and
carbon emissions, e.g. switching devices off instead of using standby to stop “vampire power”.
OPPORTUNITIES from our ENERGY TRANSITION 
Economic opportunities include:
o regeneration of local areas
o creating sustainable jobs and businesses: local job
creation and upskilling/reskilling of local workers,
not just in installation of energy infrastructure but
in manufacturing, supply chain and maintenance
o strengthening communities and businesses by
managing local energy needs and reducing costs      £284 Million Renfrewshire as an area spends an estimated
£284M annually on all of its energy and fuel bills. 
This means that 6.3% of everything that is earned
leaves the area to pay for energy and fuel. 
Think of the opportunities if some of this was
spent in the local economy (through local
energy generation meeting local demand) to
benefit our communities.
Page 39 of 192

Page 46

Transport infrastructure is a key economic and social driver – it connects people to jobs, education, services and
each other.  However transport is also the biggest contributor of greenhouse gas emissions in Scotland, and these
emissions have not reduced much over the last 10 years.  This is an area where we collectively have an opportunity to
significantly reduce our emissions; improve the air that we breathe; save money; and improve health and wellbeing by
choosing different forms of travel, whether it’s a short trip to the shops or a longer commute to work and includes
changing how we work as a Council and how staff travel as part of daily work duties.
Over half of journeys in Scotland are under 5km - if we choose to walk, wheel or cycle instead of taking the
car for these shorter journeys we’ll be helping to reach our net zero target.
Transport makes up 34% of Renfrewshire’s total emissions - made up of personal travel (diesel and
petrol cars, motorbikes and buses); freight (HGV, diesel and petrol LGV); and railways.  
o on average in Scotland, we are driving 80 more miles annually than we did a decade ago - the
COVID-19 lockdown led to a 23% fall in traffic in 2020, and a significant increase in cycling, in
part due to people feeling safer as a result of reduced road traffic
o replacing car journeys with public transport can reduce emissions by 42% using the bus, and 73% using trains 
Although Glasgow Airport is located within the Renfrewshire area, both shipping and aviation are largely controlled at a
higher government level and cannot influenced at a local level.  As such, these emissions are calculated at a national level
– but they are significant and will need to be reduced to meet national emissions reduction targets. 
WHAT DOES SUSTAINABLE TRANSPORT LOOK LIKE FOR RENFREWSHIRE? 
In order to cut emissions from transport at the scale required to meet net zero, we will need to
be ambitious.  A transport system designed around private car use can make getting about for
non-car users difficult and causes barriers to people moving around and accessing services they
rely on.  Sustainable transport is not just about switching to electric vehicles (EVs) - it’s about how
we organise all transport; where we source goods from; and how goods and people are moved
around.  Redesigning and improving local areas, and freeing up local space traditionally used by
private vehicles, provides opportunities to create more green and open spaces for communities
to enjoy and will make our local areas safer, more attractive and healthier places to live, work
and spend time in.  
Improvements in transport connectivity reduce travel time and lower the costs of transporting
goods and people, bringing benefits to citizens and businesses through greater employment and social opportunities,
increased economic productivity and local economic growth and investment.  Scotland has a world-leading aspiration of
reducing car miles by 20% by 2030 – and we need to align with this at a local level.  Walking, wheeling and cycling have
additional benefits of improving health and wellbeing as well as reducing emissions and often saving money - but we need
to recognise that for some reducing car use will be more challenging.  We need to address common issues that people
have with current transport systems to ensure equal access to opportunities and services and facilitate transition away
from car use as much as possible.  Issues include people having to spend a significant proportion of their income on
transport or living in areas with limited or no available public transport.  We need to ensure safe, active travel links
between and within our local centres and links to key destinations, including employment opportunities, so that everyone
can safely walk, wheel or cycle to get around.
SUSTAINABLE TRANSPORT: We will maximise sustainable transport opportunities to
deliver an inclusive, affordable transport system that provides choice for all 
PRIORITY AREAS FOR SUSTAINABLE TRANSPORT 
1: maximise active travel opportunities: making walking, cycling or wheeling easy, safe and attractive travel options
for all through effective infrastructure
2: increase public transport patronage: enabling an inclusive, safe, effective and affordable public transport network
for everyone
3: minimise car miles: support behaviour change through improved and enhanced active travel and public transport
provision to reduce car miles
4: enable modal shift to Ultra Low Emission Vehicles (ULEVs): putting in place infrastructure and strategies to enable
shift to ULEV cars, buses and heavy goods vehicles 
5: alleviate transport poverty: advancing equality of opportunity, ensuring everyone has safe and affordable
transportation to access services, employment and social activities
6: local carbon offsetting: to make every trip in the Renfrewshire area net zero carbon 
Page 40 of 192

Page 47

Continued investment and emphasis on supporting car use and ownership further locks in inequalities of access to
services and employment. Policies such as free bus travel for under 22s helps advance equality of opportunity as cost
of transport can be prohibitive for young people getting to employment opportunities or wider social activities.
20-minute neighbourhoods (or ‘walkable neighbourhoods’) are when residents can meet all their day to day needs
without having to travel more than 20 minutes by walking, wheeling, cycling or public transport.  In rural areas this is
tailored to local living and 20 minute hubs.  Both approaches make the local places where we live and work more resilient
and sustainable and promote equality and inclusion, helping to tackle inequality.  Equal access to essential services and
social support networks is important for all of us, but particularly for people with care needs, older people, younger
people, disabled people, young families and people of low income, and this is a key priority. 
Quality, connected, sustainable transport systems will enable everyone to access goods, services, amenities
and social connections that are essential for health and wellbeing.
WE ARE working with SPT and bus operators to support infrastructure improvements, including bus prioritisation (traffic
signals and bus lanes) and improving journey times and on-time journeys.  We are also supporting active travel for
key/functional journeys by addressing network breakages, improving existing active travel routes and creating new
routes, with safe crossings at heavy traffic areas and busy junctions and traffic calming measures to increase active
travel and lock in positive behaviour changes which arose due to the COVID-19 pandemic.
YOU TOLD US: that public transport needs to be a central part of the mix going forward as well as an emphasis
on active travel.  Barriers need to be removed for it to be viable for people make the switch to affordable,
sustainable transport for journeys to employment opportunities, services and social needs. 
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO SUSTAINABLE TRANSPORT:
1: We will remove the need for new petrol and diesel light commercial vehicles in the Council fleet by 2025 and phase
out the need for all new petrol and diesel vehicles in the Council fleet by 2030
2: We will explore options for a public bike share scheme (including e-bikes) and will continue to work with local
communities to identify active travel infrastructure to be systematically upgraded and extended where feasible and
create strategic new paths for functional journeys, alongside policy updates and promotion to enable more people to
walk, wheel and cycle safely and more often
3: We will ensure safer streets that enable active travel, including introducing 20mph zones where proportionate, to
make our communities safer, identifying suitable areas for pedestrianisation and segregated/off road active travel
networks 
4: We will work with public transport partners to explore options for increasing deployment of low emission buses,
including electric and hydrogen vehicles, and improving public transport provision across the area
5: We will advance equality of opportunity by exploring options for a public EV car club scheme and through
continuing to invest in and expand public EV charging infrastructure across Renfrewshire, and will meet the equivalent
of 100% of this increased electrical demand from renewables by 2030 
One Small Action: During lockdown, the number of people walking or cycling instead of using other forms of
transport increased so much in Scotland that air pollution levels were nearly halved!  Traffic levels are now back up to
pre-pandemic levels – can we make small changes to lower these car journeys again? 
BENEFITS of our TRANSPORT TRANSITION 
By moving away from the emphasis on investment to
support car use we will:
o advance equality of opportunity of access to
services and employment, and improve social
connections
o reduce traffic congestion, air pollution and noise
pollution to make our local communities safer,
healthier and more pleasant for everyone 
o improve physical and mental health and wellbeing
by increasing walking, wheeling and cycling
o create people centred places with improved access
to services, opportunities and each other 
MAIN BARRIERS to ACTIVE TRAVEL 
o safety concerns (incl. driver behaviour and
particular concerns of women and girls around
their safety on quieter routes)
o condition of roads and cycle routes (incl. surfaces,
lighting and overhanging vegetation)
o lack of on-road cycle lanes
o lack of off-road, traffic-free cycle routes
o bad weather
o traffic congestion
We can’t promise to fix the weather, but we will work
with partners to address the other barriers, to
increase active travel opportunities for everyone 
Page 41 of 192

Page 48

A circular economy is a key part of the solution to the climate emergency – where products, services and resources are
optimised; where everything has value; and waste is minimised or designed out.  It is described as ‘make, use, reuse,
remake’ instead of the current linear system of ‘buy, use, dispose’.  This will help dramatically reduce waste generated,
as well as saving the Earth’s valuable finite resources, reducing our emissions and reducing costs.   
Renfrewshire’s latest data shows that 91.8% of household waste is now being diverted from going to landfill.  This is due
to waste and recycling collection service changes, introduced in 2018, alongside participation in the Clyde Valley Waste
Project which generates energy from residual waste (i.e. non-recyclable waste from the grey bins). 
In its first year, the waste and recycling kerbside collection changes led to:
 a 9.6% reduction in grey bin waste 
 an increase in recycling from 49% to 53% (the pandemic impacted recycling - in 2020 it
dropped back down to 49%, but 2021 showed an increase again to 52%)
 food and garden waste recycling up 36%
 increased segregation leading to improved quality and quantity of recyclates: moving
down a full contamination band for our plastics, cans and glass service
The pandemic has had an impact on waste prevention, how we recycle and what we use. Disposable items increased
initially to help stop the spread of the virus, but food waste was found to have reduced.  The pandemic also affected
household waste figures: in 2020, there was an increase of 3,400T in non-recyclable (grey bin) waste, and an increase of
4,300T recyclable waste (green, blue and brown bins), but an overall reduction in recycling rate from 53% to 49.1%.  In
Renfrewshire, since the recycling centres reopened after lockdown there has been a marked increase in black bags of
waste as opposed to people separating waste into the separate skips.   
WHAT DOES A CIRCULAR ECONOMY LOOK LIKE FOR RENFREWSHIRE? 
Total consumption has increased in Scotland since 1998, along with an increased population. 
A lot of our emissions are also related to the fact that many of our goods are imported,
particularly from China and the EU.  Transitioning to a circular economy will keep our
resources and materials in use for as long as possible, extract the maximum value from them
whilst in use, then recover and regenerate products and materials at the end of each service
life.  Behaviour change alongside innovative new processes and standards will lead to a
society and economy in which fewer resources are consumed and wasted, which will benefit
our environment, economy and our communities. These changes will bring businesses new
commercial opportunities, reduce resource costs and also reduce carbon emissions. 
As individuals, the best thing we can do is to only buy what we need - repairing and reusing;
ditch unnecessary single use items; recycle; and shop locally where we can.  Shopping locally
not only supports local businesses and jobs, but also shortens supply chains which brings
resilience and reduces the distances and emissions required to transport goods.  The Plan
for Net Zero will follow the waste hierarchy – with preventing waste at source being the key
priority, followed by reuse and repair, recycling, recovery and then disposal as a last resort.  
CIRCULAR ECONOMY: We will make Renfrewshire a circular economy society:
minimising waste & maximising reuse, recycling & recovery of resources rather than
treating them as waste 
PRIORITY AREAS FOR A CIRCULAR ECONOMY 
1: reduce waste at source: minimise carbon impact per person in the products and services we buy through cutting
consumption and reducing waste at source, including water conservation, eliminating demand for non-essential
single use and disposable items
2: maximise reuse, repair and recovery: make more effective use of resources through keeping goods and materials
in use for longer, stepping away from a ‘take-make-dispose’ economy
3: sustainable waste management: enable behaviour change and embrace innovation to maximise recycling and
composting and minimise waste going to landfill through comprehensive engagement
4: supporting communities to reduce waste: facilitating initiatives such as community fridges; pre-loved school
uniforms; tool share stations; and mending and repair skill-sharing workshops
5: offsetting: disposal as a last resort, with local offsetting of associated emissions to compensate 
Page 42 of 192

Page 49

If food waste globally was a country, it would be the world’s 3rd largest greenhouse gas emitter.  It’s not just
the food waste itself, it’s also the resources and energy that go into producing the food – it’s the
production, processing, transportation and cooking of food that are all wasted.
Around 13% of Scotland’s waste is currently processed outside Scotland.  This represents a potential economic
opportunity which, with Renfrewshire’s strong manufacturing base, can be seized to create new business models and
create local employment.  Changing the way we use and reuse materials and stimulating the development of new markets
to deal with future waste and materials will bring sustainable, long-term local economic opportunities.   
Through the Plan for Net Zero we will work with citizens to tackle our throwaway culture to reduce demand for raw
materials, encourage reuse, repair and remanufacture to prevent waste and work with local businesses to identify the
opportunities of maximising the value of materials through recycling and recovering materials and energy, creating a
circular economy with opportunities and benefits that stay within our communities. 
Earth Overshoot Day marks the date each year when humanity has exhausted “nature’s budget”, i.e. we
have consumed all the biological resources that Earth regenerates during the entire year.  In 2022 Earth
Overshoot Day landed on July 28th, so for the rest of the year we are in environmental deficit.  
WE ARE supporting a number of community pantries and larders in Renfrewshire who make use of surplus food from
supermarkets and other sources, helping to reduce food waste and carbon emissions.  We are also working with Council
services to link them with the community food projects to ensure surplus food is redistributed rather than thrown away  
YOU ASKED: Can we facilitate distribution of excess food from local shops and businesses and Council services to
food banks, community pantries or households who could benefit, to reduce food waste but also to help alleviate
the cost of living crisis many people are going through?
HOW THE COUNCIL WILL LEAD & ENABLE THE TRANSITION TO A CIRCULAR ECONOMY:
1: We will identify procurement hot spots within the Council’s supply chains, activities and operations to maximise
circular economy opportunities; optimise local supply chains; and identify areas where we can reduce carbon in the
products and services we buy through innovative procurement  
2: We will ensure recycling is accessible for everyone, including non-standard properties, e.g. tenements and flats,
and work to resolve problem areas such as storage space, stairs, communal bins, lack of participation and fly tipping
through ongoing stakeholder consultation and engagement
3: We will ensure that all Council buildings, including schools, have the facilities for the full recycling collection service
and work with local businesses and commercial waste providers to identify improvement opportunities  
4: We will promote sharing and repairing behaviours (including within our own operations) and work with local
partners to expand existing models of sharing libraries and repair cafés and workshops 
5: We will reduce the carbon impact of waste from Council operations annually per head of population, monitoring
and sharing progress as well as lessons learned from initiatives which have been implemented
Think globally, act locally: Textile production uses thousands of billions of litres of water (4% of the world’s
freshwater), and we throw away wearable clothes each year.  Donating pre-loved clothes is a great way to support 
all households to access quality, affordable items and ensures textiles are kept in use for longer and recycled or
repurposed, further reducing resource use, maximising the value in our materials and reducing waste going to landfill.
HOUSEHOLD WASTE BIN ANALYSIS 
Analysis on Renfrewshire household
grey bins in 2022 found that 61% of
waste could have been recycled:
14% could have gone in the green
bin (glass, plastics, cans and tins)
7% was paper or card which could
have gone in the blue bin
34% could have gone in the brown
bin (garden or food waste)
6% could have been recycled at local
Recycling Centres (textiles, wood,
electrical items 
BENEFITS of a CIRCULAR ECONOMY
A circular economy is about making better use of resources
and how we deal with products at the end of their life:
o changing consumption patterns to tackle our
throwaway culture, reduce waste and save money
o moving to recycled and recyclable materials to reduce
the amount of raw materials required: reducing fossil
fuel use; waste; and emissions
o local benefits local employment opportunities, lower
cost options to access goods and lower local pollution 
o boost our economy and innovation new business
models focused on reuse, repair, remanufacturing and
sharing offer significant innovation opportunities,
improve productivity and open up new markets 
Page 43 of 192

Page 50

The climate crisis is not felt equally – this is true in Renfrewshire, in Scotland, and across the world.  Climate change
makes existing inequalities worse such as poverty, disability, poor health.  Often the most vulnerable and
disadvantaged in our communities, who have contributed least to climate change, are most impacted.   
Social justice is at the heart of our Plan for Net Zero.  Our transition to net zero is not just an
opportunity to tackle future inequalities, but also to address and deal with existing inequalities. 
We want to empower our communities by ensuring a just transition to net zero with social justice and health and
wellbeing at its core for current and future generations.  We will listen to our communities and addressing their
local needs on an area by area basis, while empowering and enabling local action so that benefits stay within our
communities. This will ensure the benefits of the transition are evenly distributed and fairly accrued; will reduce
the gap between the richest and poorest; and will ensure the most vulnerable in our society are not further
disadvantaged as a result of unintended consequences. 
WHAT DO CONNECTED COMMUNITIES LOOK LIKE FOR RENFREWSHIRE? 
Social justice promotes fairness and equity in a society that is mutually shaped to meet everyone’s needs and ensure
that everyone is safe and secure.  The 5 main principles of social justice are: 
o access to services; 
o equity; 
o participation; 
o diversity; 
o human rights.   
Putting people and our communities at the centre of our transition to net zero will enable us to address existing
and future inequalities, creating benefits and opportunities for all.  To ensure social justice and a just transition, we
need to explore the risks, benefits and impacts of decarbonisation on those living in poverty and other vulnerable
groups within our society. 
The Plan for Net Zero cuts across many aspects of our lives and aligns with civil, economic, social and environmental
rights that everyone, including our children and young people, are entitled to.  This is why it is key that all groups
are given the opportunity to be listened to in the design and delivery of the Plan.   
‘Place’ is a key aspect of the Plan for Net Zero.  Through understanding our area, we recognise the differences
across local areas and settlements (i.e. rural vs urban; gas grid vs off gas grid) so that proposed solutions reflect
each area and take into account local distinctive needs; opportunities and priorities.     
The Plan for Net Zero relies on a joined up approach across all our stakeholders - using the skills, expertise and
capacity of partners, communities and businesses across local areas to identify opportunities.  This will encourage
collaboration and partnership working with groups within those areas so that solutions can be community led.  
CONNECTED COMMUNITIES: We will empower our communities by ensuring an
inclusive and just transition to net zero with social justice and health and wellbeing
at its core for current and future generations 
PRIORITY AREAS FOR CONNECTED COMMUNITIES 
1: comprehensive and ongoing engagement: including traditionally under-represented groups, to ensure all
voices are heard, enabling all stakeholders to contribute to the design and delivery of the Plan for Net Zero
2: supporting community initiatives and partnership working: enable local action through knowledge sharing
and skill sharing and identify local spaces suitable for community projects as well as opportunities for
collaborative working, with stakeholder involvement to ensure solutions are tailored to different communities’
needs, increasing community resilience and ensuring benefits stay local
3: socio-economic impact assessments: to identify and evaluate direct and indirect impacts of proposed
interventions and projects to ensure benefits are shared equitably and no one is further disadvantaged
4: our children and young people: children and young people are the least responsible for climate change and
inequalities yet are affected by the impacts of both.  We will work with our children and young people to address
their priority issues which affect them and identify solutions to benefit them, their families and wider society
and tackle existing and future inequalities to improve outcomes for all
5: support and advice: signposting to grant funding and ensuring impartial advice and support is in place in
advance of change 
Page 44 of 192

Page 51

Connected communities are more likely to respond better to the challenges of the climate emergency and are
also able to build on their local knowledge, assets and capabilities to help transform and adapt their local area
for the benefit of the whole community, including those most vulnerable.
We want to enable participation in the Plan for Net Zero, so that everyone is involved in shaping just, fair and
inclusive policies that address inequalities as well as climate change impacts.  Solutions will recognise and reflect
local differences and identify opportunities for collaborative and partnership working in a way that empowers
communities and ensures that benefits are retained locally and that we meet the current and future local needs. 
Periods of significant economic change (such as the pandemic) can end in younger people, low income
households, disadvantaged communities and the most disadvantaged groups falling behind – we will
work to ensure this is not the case through a just transition. 
WE ARE we are engaging with our COP26 Local Ambassadors and linking closely to schools as part of an overall green
programme.  To ensure we engage with all young people, we have developed a ‘child friendly’ version of this Plan
for Net Zero to ensure our young people can participate and give feedback.  The Climate Panel is a representative
sample of residents, but our focus is also on engaging traditionally under-represented groups to ensure all voices are
heard in the design and delivery of the Plan for Net Zero and ensure that any interventions don’t further disadvantage
or make life harder for those already experiencing difficulties.  
YOU TOLD US: Engagement of children and young people is critical – we need to target older children also
and ensure we’re not missing teens.  You also highlighted that we need to be mindful that people who
filled out the survey may all be engaged already – are we reaching everyone? 
LOCAL COMMUNITY RENZERO PROJECTS 
Community Climate Fund: awarded up to £3K to
community organisations to develop localised,
green community projects tailored to the needs
of individual communities.  The aim is to
encourage participation and raise awareness of
the climate emergency within our communities,
with initiatives being designed and delivered by
local residents but supported by the Council.
Click to read more on these and other local
community based projects 
HOW THE COUNCIL WILL LEAD & ENABLE CONNECTED COMMUNITIES:
1: We will work with partners and local organisations to launch a one-stop information service which links and
signposts to support and advice across all areas of the Plan for Net Zero and address the cost of living crisis   
2: We will implement the Fairer Scotland Duty in all our decision making and actions in response to the climate
emergency to ensure all decisions and actions help to tackle inequality as well as reducing emissions
3: We will embed community wealth building into our procurement practices to ensure a local-centred approach
which redirects wealth back into the local economy and provides opportunities and benefits into the hands of local
people
4: We will work with our communities to identify opportunities for land and assets within their local area to
develop local projects which benefit those who live there, e.g. community energy opportunities, food growing,
wild flowering and tree planting, flood resilience – connecting people through regenerated local space and tackling
inequality through community collaboration  
5: We will listen to all our communities to hear what their issues and priorities are in order to design local solutions
which meet the needs of all our local citizens fairly, with a focus on those who are most vulnerable, to contribute
to improved social outcomes, including assisting alleviation of fuel poverty; reducing health inequalities; and
reducing adverse climate change impacts, while keeping communities updated on action and initiatives being
proposed locally
Think globally, act locally: Local food growing reduces transport miles and ensures fresher, seasonal food. 
People growing and eating their own produce not only has health, wellbeing and social benefits, it also
maintains local green space.  Buying from local producers also helps the local economy and protects local jobs.
OPPORTUNITIES from CONNECTED COMMUNITIES 
Opportunities include:
o regeneration of local areas: to benefit those that
live there, e.g. creation of food growing spaces
o creating places for social interaction and
community support: positive impacts on children
and young people as well as vulnerable groups;
assisting isolation and improving health, wellbeing
and social outcomes    
o empowering communities: more localised
decision making and strengthening links locally
Page 45 of 192

Page 52

We want to ensure connected communities and resilient places across Renfrewshire.  The COVID-19 pandemic
highlighted and exacerbated inequalities and exposed the vulnerability of many of those within our communities, which
has further emphasised the need to build resilience within our communities and economy. 
Through the Plan for Net Zero we will ensure our communities; blue, green and grey networks; buildings;
and infrastructure are resilient and adapted to a changing climate to reduce the risks and vulnerability of
unavoidable impacts, while connecting people and nature across Renfrewshire. 
Severe weather and climate impacts are already affecting our communities - recent local storms and flooding events
have again shone a spotlight on the importance of resilience and adaptation.  We will incorporate resilience and
adaptation into the Plan for Net Zero and work with local organisations and communities to identify climate risks to
plan and prioritise actions and interventions that enable us to prepare, respond and recover from severe weather and
climate change impacts.  We also need to identify and seize opportunities from our transition to net zero. 
WHAT DO RESILIENT PLACES MEAN FOR RENFREWSHIRE? 
Whilst a number of significant challenges come with climate change, taking action to mitigate and adapt can bring
multiple benefits for our local environment, society and economy.  The Plan for Net Zero will identify and create new
opportunities to promote sustainable local development, enhance quality of life, improve air quality, stimulate
investment and innovation, create sustainable local jobs and reinforce stakeholder participation and co-operation. 
The Plan for Net Zero will support inclusive growth and provide equality of opportunity through the creation of
employment opportunities; and empowerment of communities through facilitation, skills development and education
to ensure that economic growth and benefits are distributed fairly across society and that opportunities from the
transition to net zero are created equally for all our residents. 
Our green and blue assets (land and waterways) across Renfrewshire are full of opportunities and the Plan for Net Zero
will look strategically at how our land is best used.  This is not just about planting trees to offset emissions and locking
up land for one purpose, but ensuring we’re doing our maximum to reduce emissions before offsetting, e.g. bringing
vacant and derelict land back into use for greening and rewilding in combination with renewable energy generation
opportunities; identifying and building in co-benefits of interventions such as biodiversity, improved air quality, long
term economic opportunities and benefits for local communities and building in access and recreation.   
Some impacts of climate change are already ‘locked in’ and these need to be managed.  Existing infrastructure and
buildings may need to be adapted to prepare for these impacts.  Early warning systems, such as flood monitoring and
forecasting for local communities, are key in disaster management, as well as area-based emergency response plans
and continuity plans.  The Plan for Net Zero will enable local emergency response plans to be prepared in advance and
reviewed, communicated and updated as required with all key stakeholders and our communities. 
RESILIENT PLACE: We will optimise biodiversity and nature locally to enhance our
natural environment and maximise green economic opportunities, while planning
and preparing for impacts of climate change 
PRIORITY AREAS FOR RESILIENT PLACES 
1: ensuring resilience: of our communities, buildings and critical infrastructure to local climate impacts
2: protecting, restoring and enhancing existing habitats and species: through prioritised nature-based climate
adaptation actions including protection of ecosystem services, e.g. control of soil erosion and water regulation
3: a green recovery with community wealth building: capturing the opportunities of a just transition to net
zero, creating local green jobs, developing sustainable skills and nurturing a wellbeing economy
4: helping nature locally: greening outdoor spaces and building footprints, as well as installation of bird feeders,
hedgehog houses and insect hotels in public spaces to ensure everyone can enjoy and access nature
5: improving air quality: through a reduction in emissions from energy, transport and industry, alongside
increased greening of the local environment
6: sequestration: maximising the carbon absorption potential of our natural environment through activities
such as the restoration of our peat bogs; tree planting; and improved land practices   
Page 46 of 192

Page 53

Inclusive growth is a key focus of the Plan for Net Zero: opportunities for community-led activity: creating jobs and
developing local supply chains; re-training and upskilling of local workforce; and creating thriving and innovative
businesses with quality jobs and fair work for everyone.
As a Council, we have a key role in the transition to net zero – we only make up around 2.5% of Renfrewshire’s
emissions, but we can influence around a third of emissions in the energy, waste, land use, residential, transport and
other sectors that are directly shaped or influenced by Local Authority practice, policy or partnerships. 
Working collectively with all our local stakeholders, the Plan for Net Zero will take a place-based approach,
ensuring the positive wider impacts, benefits and opportunities are distributed fairly across all our places and
people, addressing the twin challenge of climate emergency and biodiversity loss. 
WE WILL: ensure trees are recognised as valuable assets, optimising the benefits and significant contributions trees
make to our area by improving the quality of planting and maintenance and establishing trees as critical infrastructure
with high amenity value, that improve landscapes in line with criteria of tree preservation orders (TPOs). 
YOU TOLD US: more trees need to be protected so developers and landowners would need permission to remove
them. 
One small action: with a massive impact is helping nature locally – wildflowers, bee bombs, hedgehog houses,
bird feeders, insect hotels, real grass in gardens - all make a difference to our local nature and biodiversity and
make our communities more attractive places to live.
HOW THE COUNCIL WILL LEAD & ENABLE TO ENSURE RESILIENT PLACES:
1: We will work with colleges, schools, universities, local training providers, apprenticeships and staff training, to
ensure that the courses and training opportunities exist for the stable and sustainable, quality jobs that will be
created to ensure every person is able to reskill and upskill to participate in a just transition to a net zero
2: We will carry out an inventory of all Council land and assets, including vacant and derelict land, to explore how
we can store more carbon on our land than we produce – identifying appropriate locations and measures to
increase the carbon stored on land we own and increase biodiversity on public land assets, e.g. restoration of peat
bogs; greening public spaces; and wild flowering instead of using lawnmowers on verges where safe to do so 
3: We will encourage change – supporting development of 20-minute neighbourhoods/rural hubs so that citizens
can access the services they need locally; ensuring sustainable transport infrastructure; and increasing local
renewable energy generation (both new development and using existing infrastructure).
4: We will produce a proposed pipeline of our major infrastructure projects in order to link with skills transition
and local employment opportunities and identify skills gaps, shortages and requirements ahead of time.  This
proposed pipeline will build on work that is already underway to encourage investment in local areas; enable local
supply chain and manufacturing opportunities to be identified; de-risk private sector investment; and bring about
regeneration of local areas. 
5: We will undertake proactive measures: adopt an early warning system to prepare for extreme weather events
such as heatwaves and flooding; identify “grey” and “nature-based” flood protection measures; put in place local
emergency response plans; and undertake a climate risk register of all public assets to ensure all our infrastructure
and buildings, including historic buildings are resilient to the impacts of climate change 
RENFREWSHIRE PEAT BOGS 
Renfrewshire’s has a wide range of biodiversity
habitats, including extensive peat bogs. While  healthy
peat bogs which can capture and store huge amounts
of carbon; reduce flooding; and provide a home to a
wide range of plants and animals, degraded peat bogs
emit carbon.  The Council is working with public
partners and tenant farmers to restore our peatlands
to reduce emissions and lock up carbon; and protect
and enhance these diverse and unique local wildlife
habitats.     
While some land in Renfrewshire is a carbon sink,
the net effect of all land use currently makes up 2%
of total area emissions.
OPPORTUNITIES FROM RESILIENT PLACES 
The Plan for Net Zero will see action taken that:
o increases our communities’ resilience to climate
change impacts
o raises public awareness of and combats local
climate change and biodiversity loss issues
o supports organisations to become climate ready
o helps local supply chain and manufacturing
businesses and our local workforce plan for what is
on the horizon through our route map and project
pipeline – attracting investment, supporting
business growth and retaining and creating local,
sustainable employment opportunities with a skilled
workforce 
Page 47 of 192

Page 54

A net zero Renfrewshire will be a place where we minimise our greenhouse gas emissions - meeting our energy and transport needs through renewable and low
carbon means, while offsetting any emissions which we are unable to remove through greening our local spaces, reforestation, wild flowering, tree planting and
restoring and enhancing our peat bogs.   
It will be a place with clean air, with safe and accessible sustainable transport options meaning more people walking, wheeling and cycling than in cars.  The transition
to net zero will create opportunities for local job creation and upskilling of local workers with increased quality, sustainable jobs and investment in the local area.  Fuel
poverty will be alleviated and, by placing social justice and a just transition at the core of our Plan for Net Zero, the quality of life of all our residents will be improved. 
It will be a place where we enable and meet the demand for local food growing, transforming under-utilised spaces; a place where we optimise biodiversity locally to
enhance our natural environment, making our centres attractive places to spend time in while also providing shade and shelter; and a place where we empower our
communities, collaborate and listen to ensure a just transition, where the benefits and opportunities of the transition are shared fairly across everyone in society.
RENFREWSHIRE IN 2030 & BEYOND
What will a net zero Renfrewshire look like?         
Page 48 of 192

Page 55

The Plan for Net Zero will be a result of collaborative work - led by the Council, but co-designed with public, private and
community organisations and with us all working together on an area-wide effort to bring about increased quality of
lives while living within a smaller carbon footprint overall. 
The good news is that we’re not starting from scratch – a solid foundation has been created and we’re building on
existing activities and knowledge across all partners in order to ensure we’ll have cleaner air; affordable energy; be
supporting sustainable jobs; have increased sustainable transport options; have resilient communities; and be building
back and designing systems in a way that creates a better place for us all to live, work and spend time in.   
Given the significant impact on emissions of transport and residential energy use within Renfrewshire
area, early intervention, particularly developing projects with partners that have a public engagement
focus, will be vital if we are to work towards net zero by 2030 
Baselining our area emissions and estimating future emissions, has provided a clarity on the challenges; the key areas
and activities that we need to focus on; as well as the scale of action needed in order to work towards net zero by 2030. 
This increased understanding of our climate targets will also help to inform current and future policy and ensure that
the climate emergency is at the forefront of decision making.   
THE KEY PHASES TO NET ZERO 
NEXT STEPS: We will continue to engage with all our stakeholders as we head into the
next phase of the Plan for Net Zero and build on existing activities and identify new
opportunities to accelerate change   
2022: we are here During the groundwork phase we are undertaking engagement
with citizens and key sectors; identifying necessary areas of focus, setting annual
targets and developing the phased road map to 2030; developing tools to measure
and monitor our progress to net zero; implementing early wins and key projects
which can be delivered quickly and/or replicated easily; making operational changes
to lead by example; investigating funding streams and innovative ways to finance
projects; and building new partnerships and strengthening existing partnerships. 
2023: Scaling Up Action Moving to a delivery focus – identifying and initiating
projects that provide the biggest carbon savings; completing smaller exemplar projects
and using lessons learned to scale up and replicate; aligning supporting policies with
targets; setting out area-based schemes for energy efficiency and potential heat
networks as a key priority to improve lives and alleviate fuel poverty; test new
technologies and innovative delivery methods; identify opportunities for partnership
delivery; longer term projects such as reforestation and tree planting will be
implemented during this period; initial reporting of progress and assessment of targets   
2024 onwards: Accelerating Action Accelerating further development of projects
and initiatives; smaller schemes gaining momentum (e.g. energy efficiency retrofits);
community energy projects are underway; nature-based solutions such as tree
planting and peat bog restoration being undertaken at pace; assessing, monitoring and
reporting progress annually against targets; larger-scale projects such as district
heating and large-scale solar farms being completed; activity focuses on phasing out
the remaining greenhouse gases and ensuring offsetting is sufficient to absorb the
balance; a range of social, environmental and economic benefits being realised;
resilience to future impacts of climate change to our communities, buildings, land and
wildlife addressed during this period.
CONSULTATION ACROSS ALL PHASES OF THE PLAN FOR NET ZERO
Page 49 of 192

Page 56

Consultation with all stakeholders is essential across all phases in the design and delivery of the Plan for Net Zero. 
Two-way communication channels will remain in place as projects and activities are implemented to ensure everyone
is informed of progress and can provide feedback on our collective journey to net zero.  This will include:
o focused engagement to identify barriers for our citizens and local businesses in order to find solutions and
ensure everyone benefits from the transition to net zero;
o stakeholder engagement with key groups, such as housing developers, energy companies and network
providers; transport providers; land management agencies; and education and training providers, not only to
understand their influence but also their role in progressing to net zero; and 
o a final round of consultation and engagement to gain feedback and prioritise the long list of actions. 
In addition to ongoing stakeholder engagement, our 5 key actions for Phase 2 are:
1.Detailed Phased Road Map to 2030: we will look strategically and holistically across the whole Renfrewshire area
to identify opportunities and solutions and to set targets, which will be highlighted in the form of a road map with
to aid communication with all our stakeholders.  The detailed Net Zero road map will be broken down into clear annual
phasing and will highlight the interim carbon emissions reduction target for each year and will show how the
Renfrewshire area as a whole, and Renfrewshire Council as an organisation, will fare in relation to these targets if the
proposed interventions and projects are implemented.  The target setting will take into account both national and local
policies and will outline the actions that can be taken to meet our long-term and near-term targets.  Projected
Completion Date: 31st March 2023.
2.Quantified Delivery Plans: we will set out costed, area based phased delivery plans with benchmark capital costs
for each period of the Net Zero road map and will quantify and consider all impacts of the proposed delivery plans. 
The Plan for Net Zero will deliver multiple outcomes simultaneously (not all of which can be monetised, e.g. carbon
reduction, fuel poverty alleviation, job opportunities).  We will undertake area-based socio-economic impact
assessments to identify and evaluate direct and indirect impacts and benefits of the proposed strategic interventions
and projects to be implemented through the Plan for Net Zero.  Viable and replicable projects and low regret options
will be prioritised, and appropriate zones for priority area-based delivery programmes will be designated across the
Renfrewshire area.  Projected Completion Date: These costed delivery plans will be prioritise and phased for
completion between 31st March 2023 and 31st October 2023.   
3.Verifying, adopting and updating our emissions modelling tool: we will quantify the impact of the phased actions,
to inform future targets and present data in an interactive way.  Good quality data is key in order to track proportional
progress to net zero.  Updating the tool in line with the road map as projects are implemented or as new technologies
arise will give a running total of carbon savings within each phase, correlating with amounts of sequestration required
in order to work towards net zero by 2030.  Projected Completion Date: Annual updates from 1st November 2023 as
projects and new technologies are delivered. 
4.Developing a carbon budget for Renfrewshire Council: and encouraging other organisations across the
Renfrewshire area to prepare carbon reduction plans.  Setting an annual carbon budget works in the same way as
setting a financial budget and will help us to meet our net zero targets as an organisation.  Identifying our emissions by
service area will be key in improving our understanding of how our emissions relate to the services we provide and the
reductions we need to aim for in order to adapt to delivering the same high quality local services in a way that is fit for
a resilient, net zero future.  We recognise that delivering the carbon budget will require investment and changes to the
way in which resources are deployed, but believe that an annual carbon budget and trajectory, calculated in line with
each financial year, will contribute to keep us on track to reaching our net zero target as an organisation.  Projected
Completion Date: 6th April 2024. 
5.Developing an Adaptation Plan for Renfrewshire: Developing adaptation solutions and implementing a phased
programme of priority actions which are designed to respond to and address the local impacts of climate change that
are already happening, as well as prepare for future climate risks across the Renfrewshire area.  These actions will be
centred around communities, security and resilience, infrastructure and our local environment.  Projected Completion
Date: 31st October 2023. 
Transparency and openness: ensuring all stakeholders can access modelling tool using an open data platform.  In
recognition that we need coordinated action across areas and sectors to deliver the scale of change required, our
emissions modelling tool and reporting will be used to inform future targets and to present data in an interactive way. 
We will share our spatial mapping emissions modelling tool which quantifies the impact of climate actions, in order for
stakeholders and developers to model scenarios and impacts of potential projects across the area.  The model will be
updated by the Council as evidence bases improve; new technologies and behaviour changes arise; and as projects are
implemented. 
Page 50 of 192

Page 57

The journey to net zero will transform every aspect of our lives.  Significant progress has been made in reducing carbon
emissions, providing a solid foundation to build on – but many low hanging fruits have been tackled, meaning that
remaining challenges may be bigger.  However, this also presents huge opportunities – growing our economy through
a green recovery; community wealth building and local job creation; improving health and wellbeing with cleaner air
and increased active travel; policies which put social justice at their core; reducing health inequalities and alleviating
fuel poverty through warm homes and affordable low carbon energy - while protecting and enhancing our natural
environment.  Key challenges include: 
1. Finance
Challenge: The Council would be unable to solely deliver or fund all of the projects and interventions required to reach
net zero, and so will require collaboration and commitment from all stakeholders in order to succeed.  Long-term
financial resources and large-scale investment are needed. It will require government at all levels to redirect and, in
some cases, reprioritise finance to support the scale of change required and align investment with climate priorities.    
Opportunity: The transition to net zero and a green recovery from COVID-19 brings opportunities through rebuilding,
designing better systems and putting things back together differently.  It brings opportunities to identify more
innovative and collaborative ways to finance climate action across stakeholders, including new business models; joint
ventures and partnership projects.  The road map to net zero will outline a phased pipeline of projects which will enable
investment to be aligned with key strategic programmes of work.  There are also opportunities for knowledge sharing
and collaboration across stakeholders, as well as with other local authorities, to understand different approaches,
solutions and best practice.
From a householder or small business point of view - although low cost options can often bring savings upfront, costs
can be a barrier; retrofitting is not suitable or viable for all buildings; and there are also barriers to making changes if
you rent your home.  The Plan for Net Zero will increase partnership working to signpost residents and businesses to
advice, grants and financial support and maximise opportunities for programmes that prioritise those least able to pay
who would benefit most from interventions.   
2. Resources & Skills
Challenge: The scale of transformation may result in bottlenecks in delivery due to skills gaps/shortages and supply
chain issues in key areas.
Opportunity: The road map to net zero will set out pipelines of projects enabling horizon scanning for manufacturers
and supply chain businesses across all themes and will identify opportunities and potential innovation for local
businesses to exploit where there are gaps.  For the local workforce and training providers, investment in the upskilling
and reskilling of our citizens in areas of skills gaps or demand offers sustainable career path and ensures that our local
communities benefit from the infrastructure delivery.  There is also potential for training for those in priority groups in
order to ensure benefits are fairly distributed across society and opportunities are created equally for everyone.  This
approach will ensure community wealth buildings and local job creation across all aspects – installation, manufacturing,
construction, maintenance, tree planting and biodiversity, circular economy repairs and waste reprocessing. 
Harnessing the enthusiasm many local people have to help on the journey to net zero will strengthen local volunteer
networks which can alleviate social isolation and loneliness and also provide skills to assist on the path to employment.  
3. Behaviour Change & Engagement
Challenge: Collective action will be key but some sectors more difficult to engage with and traditionally issues around
commercial data being shared, leaving gaps in baselines, monitoring and progress and leading to potential missed
project opportunities.  Traditionally, there can often low success rates in engaging with the most vulnerable members
of our society whose voices are key to ensure social justice is delivered and no one is left behind.
Opportunity: The COVID-19 pandemic has highlighted we can radically change and adapt quicker than we thought. 
There is a real opportunity to build on this momentum.  As well as our representative Climate Panel and stakeholder
consultation throughout the process to ensure communities are engaged and solutions are tailored to local needs,
there is potential for innovative engagement methods and targeted engagement with traditionally under-represented
groups which can then be utilised for future relevant Council consultations to reach across all demographics.
CHALLENGES & OPPORTUNITIES: The challenge to reach net zero cannot be
underestimated – but this transition and a green recovery from the pandemic bring
great opportunities to design better systems to distribute benefits fairly   
Page 51 of 192

Page 58

Having an open and transparent methodology for monitoring, evaluating and reporting progress is key as this ensures
that, as the Plan for Net Zero progresses each year, we can:
o track and assess what has changed (both intended and unintended outcomes) 
o understand the reasons for changes (what factors have facilitated/constrained change)
o interpret the changes and compare real versus modelled performance of projects 
The monitoring and evaluation process of collective action will also enable us to:
o provide accountability and proof of impact of actions that are taken
o inform decision making processes for the Council and all our stakeholders
o learn lessons from successes and challenges which can be shared
o improve programme design and management through an iterative process 
HOW WILL WE MEASURE SUCCESS?
Each focus area has its own metrics of success which can be quantified and measured in isolation, but which also
combine to measure our journey to net zero.  We will set annual emissions targets to align with our phased road map,
and which are designed to measure progress to our net zero target.  Initial metrics of success have been set out.  These 
will be reviewed after the first year and updated as required as new technologies or improved reporting practices come
on stream during the Plan for Net Zero.   
OVERALL MEASURE OF SUCCESS:
WORKING TOWARDS NET ZERO GREENHOUSE GAS EMISSIONS BY 2030 
What measures of success will we report for clean energy?
tonnes CO2e emissions associated with energy use
% households in fuel poverty
% of total energy (including transport) generated locally from renewables
% buildings with Energy Performance Certificate (EPC) of C or better
% reduction in building energy demand 
% buildings with low carbon heat supply 
What measures of success will we report for sustainable transport?
tonnes CO2e emissions associated with transport
% public EV charging demand met through renewables
% increase in public transport patronage
% reduction in car miles
miles of active travel paths constructed or upgraded 
What measures of success will we report for circular economy?
tonnes CO2e emissions associated with waste and recycling
% local authority collected waste sent to landfill
% household waste recycled, composted and diverted from landfill
tonnes waste generated per head of population
kWh energy generated from waste 
What measures of success will we report for connected communities?
MWh community energy generated
% m2 covered by allotments/community growing grounds
% school and pre-school kids that have access to the natural environment as part of their education
% increase in grants, support and advice contact successfully made to public partners
number of community-led projects and initiatives taking local climate action
improvements in Scottish Index of Multiple Deprivation (SIMD) indicators across all local areas
increased life expectancy across Renfrewshire 
What measures of success will we report for resilient places?
number of new trees planted locally per head of population (using right tree, right place principles)
% of residents with safe access to nature within 1km of their residence
% remaining carbon absorbed by natural environment to ensure net zero
air quality monitoring across all areas to evaluate and improve air quality 
% m2 public open spaces managed for biodiversity/number of projects to increase resilience to climate change
number of people supported to reskill, upskill or participate in training in skills required for the transition to net zero 
MONITORING OUR PROGRESS: It is critical that we have an open and transparent
methodology for monitoring, evaluating and reporting progress annually
Page 52 of 192

Page 59

APPENDICES
Page 53 of 192

Page 60

APPENDIX 1: INTERNATIONAL, NATIONAL & LOCAL POLICIES 
Meeting our target will be challenging and a number of external factors will impact this, including
national policies and their impact on local policies and initiatives, and our key partners 
The Conference of the Parties (COP) is the main decision making body of the United Nations Framework Convention
on Climate Change.  The COP21 Paris Agreement of 2015 was massive – 196 countries signed the agreement, with
the aim to hold the increase in temperature to below 2°C and to pursue efforts to limit the temperature increase
to 1.5 degrees.  It was hailed as equitable and ambitious, with each country doing its share to meet the 2°C goal. 
The Glasgow Climate Pact was the agreement reached by nearly 200 countries at COP265, held in Glasgow in
November 2021 – so what did we learn from COP26?  
o Climate justice is critical:  The Glasgow Climate Pact includes a section on loss and damage which urges
developed countries to “provide enhanced and additional support for activities addressing loss and damage”,
increasing support for developing countries to help investment in green technology and for adaptation to
impacts of climate change.  The Scottish Government pledged £2m towards loss and damage during COP26 -
described as breaking “the taboo” around direct financing for less developed countries facing climate
consequences they did little to cause.
o Acceleration of target dates: There was agreement for all countries to revisit and strengthen their current
emissions targets for 2030 by the end of 2022 in order to limit dangerous warming; and a pledge to halt and
reverse deforestation and land degradation by 2030.
o Annual reporting needed: at the time of COP26, 2030 was only 9 years away, so agreed that annual reporting
is needed for more accountability and to monitor progress closely to keep agreements on track.
o Bold transformative action is required for mitigation (reducing emissions) and adaptation (adjusting to
current or expected climate change impacts): The Glasgow Agreement is the first time fossil fuels are explicitly
mentioned in a UN climate agreement (the Paris Agreement didn’t specifically mention oil, coal, gas or fossil
fuels) – signalling a shift away from fossil fuels, with phase down of coal and phase out of fossil fuel subsidies.   
“We have kept 1.5° alive…but its pulse is weak”
Alok Sharma, COP26 President 
5 key goals on clean energy have been dubbed the "Glasgow breakthroughs" and cover more than 50% of global
emissions – these relate to:
o making clean power the most affordable and reliable option; 
o zero emission vehicles to be accessible and affordable in all regions; 
o near zero emission steel production; 
o affordable renewable and low carbon hydrogen to be globally available; and
o climate resilient, sustainable agriculture to be the most attractive and widely adopted option for farmers
everywhere 
The UN’s 17 Sustainable Development Goals and associated targets
were adopted by the world’s governments in 2015, highlighting
both environmental and social challenges that needed to be
addressed in order to achieve global sustainability and recognising
that tackling climate change is essential (with many of the goals
addressing the drivers of climate change). 
Scotland was one of the first nations to sign up to the goals – in line
with world-leading carbon reduction targets and climate action.  At
a local level, Renfrewshire Council is also committed to these goals
through our Plan for Net Zero. 
In addition to international commitments, Scotland has a target of net zero emissions by 2045, five
years ahead of the UK target of 2050, with an interim target of 75% reduction by 2030.   
5 The 2021 United Nations Climate Change Conference (aka COP26) was the 26th United Nations international conference to discuss global action on climate
change   
Figure 9: UN Sustainable Development Goals 
Page 54 of 192

Page 61

APPENDIX 2:KEY NATIONAL &LOCAL POLICIES CURRENTLY FOR EACH FOCUS AREA
Enabling Legislation: The overarching legislation nationally is the Climate Change (Emissions Reduction Targets) (Scotland) Act 2019, which amended the Climate Change
(Scotland) Act 2009. This increased the ambition to commit to net zero by 2045, with updated annual emissions targets and embeds the principles of a just transition.
The Update to the Climate Change Plan 2018-2032is Scotland’skey strategic document, settingout thegreen recovery pathway to meet these ambitious national targets.
Page 55 of 192

Page 62

APPENDIX 3: KEY PARTNERS FOR EACH FOCUS AREA
Both the Scottish and UK Government are key partners across all focus areas, both in terms of policies and legislation but also potential funding opportunities.  Locally, our
Community Planning Partners are key across all focus areas, as are all community organisations, private, public and 3rd sector organisations, schools and colleges, training
and further education establishments, local businesses and those who choose to live and work here, as well as visit the local area.  Some of our key partners also link across
multiple focus areas, but we have allocated to one main area, although they will be involved across more than one focus area. 
PLAN FOR
NET ZERO:
KEY PARTNERS
CLEAN
ENERGY
SUSTAINABLE
TRANSPORT
CIRCULAR
ECONOMY
CONNECTED
COMMUNITIES
RESILIENT
PLACE
Local and National Licenced Waste Carriers
Zero Waste Scotland
Circularity Scotland
Scottish Power and Scottish Gas Network
Energy Suppliers
Scottish Renewables
Housing Associations
Developers and House Builders
Energy Saving Trust
Home Energy Scotland
Transport Scotland
Sustrans
SPT
First Bus
McGill’s
Scotrail
Scottish Canals
Local Taxi Firms
Local Councillors, MSPs and MP
NHS Glasgow & Greater Clyde
Renfrewshire Health & Social Care Partnership
Engage Renfrewshire
Local Partnerships
Community Councils
Community Development Trusts
Tenant Groups
Glasgow City Region Local Authorities
Local nursery, primary and secondary schools
Shelter Scotland
Care homes and nursing homes
Keep Scotland Beautiful
Forestry & Land Scotland
Historic Environment Scotland
Regional Park
Crofting Commission
Scottish Enterprise
NatureScot
SEPA
Scottish Water
Skills Development Scotland
Climate Ready Clyde
Chamber of Commerce
VisitScotland
Landowners
Scottish Assessors 
Page 56 of 192

Page 63

Adaptation: the process of adjusting economic, social or natural systems in response to current or expected effects
of climate change to limit harmful consequences and exploit beneficial opportunities. 
Carbon Dioxide (CO2): the most abundant greenhouse gas (making up around ⅔ of greenhouse gases).  It is naturally
occurring but is also a by-product of human activities such as burning fossil fuels, land-use changes and other
industrial processes and contributes to climate change and global warming.  It is the reference gas against which
other greenhouse gases are measured and therefore has a Global Warming Potential (GWP) of 1.   
Carbon Dioxide Equivalent (CO2e):  a metric measure used to compare the emissions from various greenhouse
gases based upon their global warming potential (GWP). 
Carbon Emissions: the release of carbon dioxide (CO2) into the atmosphere. 
Carbon Footprint: the total amount of greenhouse gases that are emitted into the atmosphere from activities each
year by a person, building or organisation. 
Carbon Offsetting: the process of compensating for carbon dioxide emissions arising from activities by participating
in schemes which remove equivalent levels of carbon dioxide in the atmosphere, e.g. tree planting, carbon capture,
peat bogs. 
Climate Change: refers to any significant change in the measures of climate lasting for an extended period of time,
including major changes in temperature, rainfall and severe weather patterns that occur over several decades or
longer. 
Decarbonisation: the reduction or removal of carbon dioxide (CO2) into the atmosphere resulting from human
activity, with the eventual goal of minimising emissions as far as possible. 
Energy Performance Certificate (EPC): gives information on how energy efficient a building (including homes) is;
how it could be improved; and an environmental impact rating to show CO2 emissions.  Buildings are rated on a
scale of A to G, with A being the most energy efficient. An EPC is required for new buildings/homes; when you are
selling a building/home; or when renting to a new tenant. 
Fossil fuels: non-renewable energy sources formed from fossilised plants and animals over millions of years such
as coals, oil and gas. 
Fuel Poverty: defined as any household spending more than 10% of their income on energy after housing costs
have been deducted. 
Greenhouse Gases: any gas that absorbs infrared radiation in the atmosphere and contribute to global warming
and climate change. Greenhouse gases include carbon dioxide, methane, nitrous oxide, ozone,
chlorofluorocarbons, hydrochlorofluorocarbons, hydrofluorocarbons, perfluorocarbons and sulphur hexafluoride. 
Greenhouse Gas Emissions: the release of greenhouse gases (GHGs) into the atmosphere. 
Landfill: a waste disposal site in which waste is generally spread in thin layers on an area of land, compacted and
covered with soil to decompose, releasing greenhouse gases into the atmosphere 
Low Carbon: an activity causing or resulting in only a relatively small net release of greenhouse gas emissions (CO2
or CO2e) into the atmosphere. 
Mitigation: activities and intervention which lessen future climate change and its social, economic and
environmental consequences by reducing the greenhouse gas emissions. 
Net Zero Emissions: when greenhouse gas emissions are balanced by removals over a specified period. 
Resilience: the capacity to anticipate, prepare for, respond to, absorb and recover from the stresses imposed by
climate change from significant multi-hazard threats with minimum damage to social well-being, the economy and
the environment. 
Renewable energy: energy resources that are naturally replenishing such as biomass, hydro, geothermal, solar,
wind, ocean thermal, wave action and tidal action. 
Sequestration: the process by which trees and plants absorb carbon dioxide, release the oxygen, and store the
carbon.
GLOSSARY OF TERMS: 
Page 57 of 192

Page 64

How can I get this Plan in other formats?
Please email climate@renfrewshire.gov.uk to request a copy of this Plan in another format, language
or large print
Page 58 of 192

Page 65

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  23 August 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Climate Change Action Fund
___________________________________________________________________    
1. Summary 
1.1 As part of the budget approved by Council on 9th March 2020, £1M of funding
was allocated to support the organisation in progressing its response to the
climate emergency through a Climate Change Action Fund. 
1.2  Prior to the formation of the Planning and Climate Change Policy Board, the
Climate Change Sub-Committee had previously considered a number of
funding proposals developed by the organisation in response to the climate
emergency.  Following detailed discussion and engagement with members of
the sub-committee, these proposals were then formally approved by the
Leadership Board, with £978,000 of funding allocated to date from the Climate
Change Action Fund. 
1.3  This paper provides a high-level overview of the progress that has been
achieved to date in terms of the projects and initiatives supported through this
funding. 
2.  Recommendations 
2.1  It is recommended that members of the Planning and Climate Change Policy
Board:
• Note the progress update provided on the initiatives funded through the
Climate Change Action Fund to date; 
Item 3
PACC230822 Page 59 of 192

Page 66

• Note the projected financial outturn position detailed in Table 1 (section 5);
and
• Note and agree the change to scope of projects detailed at section 4.2. 
3.  Background 
3.1 In the budget approved by Council on 9th March 2020, £1 million was
allocated to establish a Climate Change Action Fund which would support the
next steps outlined in the report “Climate Change Emergency”, approved by
Council on 27th February 2020.  The report set out the initial findings and
recommendations of the Climate Emergency Working Group, which had been
convened following the Council’s declaration of a climate emergency in June
2019. 
3.2 The Climate Change Action Fund is intended to fund innovative projects and
initiatives being developed by Council services in response to the climate
emergency; provide initial funding to pilot new ideas and approaches; to
support engagement and partnership working across Renfrewshire; or to
accelerate the pace of change already being delivered through existing
initiatives.  This process is vital to the Council being able to lever in the
external funding that will be required to support climate change initiatives at
the scale and pace required. 
3.3. In particular it is anticipated that several of the feasibility studies will provide a
baseline / evidence to support proactive future funding applications. 
4.  Progress – projects and initiatives supported by the Fund 
4.1  To date, £978,000 of funding has been allocated to support 14 projects
through the Climate Change Action Fund.  A number of these projects relate
to feasibility studies or engagement work with local businesses and
communities, and good progress has been made in terms of progressing
these and appointing relevant suppliers and specialists to support this work. 
Appendix 1 provides specific detail on this progress which includes:
• the Net Zero Business Grant, which launched in May 2022.  This £100,000
discretionary fund offers local Small and Medium Enterprises (SMEs) in
Renfrewshire funding of up to £10,000 to cover up to 50% of eligible costs
to allow them to make changes to their business premises and operations
to reduce their carbon footprint. 15 organisations are currently engaged in
the grant process.
• the Community Climate Fund which provided awards of up to £3K to 18
community organisations across Renfrewshire to develop localised green
community projects and initiatives.  Recommendations for award were
Page 60 of 192

Page 67

approved at the previous meeting of the Planning and Climate Change
Policy Board, with project delivery already underway. 
• a feasibility study looking at the opportunity for a large-scale solar farm on
the former landfill site at Moss Road, Linwood.
• feasibility work at peatland sites in Renfrewshire, to identify restoration
projects to increase carbon storage, enhance biodiversity and improve
flood retention.  
• the development of an active travel strategy focused on accessing the
main areas of employment across Renfrewshire.   
4.2  Leadership Board also approved the allocation of Climate Change Action
funding of £15,000 to carry out energy modelling at an archetype primary
school to develop energy efficient refurbishment options, which could
potentially be replicated across the school estate.  Initially it was anticipated
that Bridget of Weir Primary School would be utilised as the archetype school
however it is now proposed that East Fulton Primary school is utilised for this
purpose. East Fulton Primary School is an archetype of a number of primary
schools in the portfolio and the modelling exercise will inform potential options
for other properties across the school estate.  
4.3  Further project proposals for allocations of the remaining funding will be
brought to future Planning and Climate Change Policy Board for approval. 
5.  Financial Position – Financial Year 2022/23 to 24 June 2022 
5.1  It is anticipated that £556,000 of the £978,000 funding allocated to the
projects detailed in Appendix 1, will be spent over the course of financial year
2022/23 to deliver the Climate Change Fund Programme. 
Table 1: 
Climate Change Fund Programme
Expenditure Programme
Funding 
£’000 £’000
Approved Programme   1,000   
Funding Allocated to Projects  978
Financial Year 2020-21 258 720
Financial Year 2021-22 131 589
Financial Year 2022-23 556 33
Financial Year 2023-24 33 0   
Available Funding  22   
5.2  Expenditure of £389,000 has been incurred in previous financial years. 
£258,000 relates to the Enhancement of Electric Vehicle programme with the
Page 61 of 192

Page 68

remaining £131,000 representing the initial payments on several projects
including the Housing Led Regeneration and Renewal Programme (£48,000)
and the Town Centres Climate Resilience Programme (£30,000).
5.3  A balance of £22,000 remains available for allocation. 
Implications of the Report
1.         Financial – the content of this report relates to allocated funding of £1M from the
Climate Change Action Fund 
2.         HR & Organisational Development – none 
3.         Community/Council Planning – this report includes funding proposals to support
engagement and collaboration with local businesses, partners and communities on
the climate emergency agenda. 
4.         Legal - none 
5.         Property/Assets – none 
6.         Information Technology - none 
7.         Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website. 
8.         Health and Safety - none 
9.         Procurement – none 
10.       Risk – none 
11.       Privacy Impact – none 
12.       COSLA Policy Position – none 
13.       Climate Risk – this report outlines work being undertaken by the Council to respond
to the climate emergency. 
List of Background Papers:
Climate Action Fund: Progress Update, 9 February 2022 Climate Change Sub-Committee 
Author:         Roz Smith, Climate Emergency Lead Officer                        
Chief Executive’s Service 
Page 62 of 192

Page 69

Appendix 1 – Update on projects supported by the Climate Change Action Fund 
Name/Description Funding
Allocated Summary Short summary of progress
Housing led
Regeneration and
Renewal Programme
– Zero Energy
Buildings (RenZEB)
£75,000
Renfrewshire Council will develop a
collaborative and an innovative
partnership with a research organisation
to design and deliver a social housing
new build development specification
within the context of the Council
approved Regeneration and Renewal
Programme.
The University of Strathclyde are leading the partnership in
the delivery of research work.  The team summarised the
Council’s 2018 specification, which already complied with
EESSH2 and then successfully evolved three further
iterations of a standard new housing specification – the
2022, 2025 and 2030 specifications – which progressively
reduced carbon emissions by concentrating respectively on
operational, embodied and life-cycle emissions, culminating
in the final (2030) specification’s being theoretically net
zero.  
The next phase of work will carry out further feasibility work
on district heating and/or the use  of ground source heat
pumps as an additional zero-carbon alternative to air
source heat pumps, the use of which is assumed in the
2025 and 2030 specifications.
Enhancement of
Electric Vehicle
Programme
£258,000
As the organisation moves through its
vehicle replacement programme, all
opportunities and external funding
sources are being utilised to develop the
electric fleet. 
In the next phase of its approach,
Environment and Infrastructure are
seeking to introduce electric to different
categories of the fleet, i.e. light
commercials. It is proposed that several
panel vans or transit sized vehicles will
be purchased which will allow the service
A total of 27 electric vehicles were purchased by the
Council utilising funding from the Climate Change Action
Fund and Transport Scotland. 
The 27 electric vehicles consisted of 2off Large 3.5Tonne
Vans, 18off Light Vans and 7off Cars.  These EVs bring the
total number of Fleet EVs to 127 or around 30% of the
Council Fleet.  All 27 vehicles have now been delivered for
operational use.
Page 63 of 192

Page 70

to consider options for introducing these
across the rest of the fleet, with the
opportunity to unlock further external
funding and to inform the future vehicle
replacement programme at potentially a
faster pace. 
This is the single largest vehicle category
within Renfrewshire Council’s fleet and if
electrified would significantly reduce our
carbon emissions while delivering
frontline services.
Feasibility Study -
Photovoltaic Project £30,000
The Energy Management Unit (EMU)
has identified an opportunity to deliver
largescale renewable electricity from
Photovoltaic Panels (PV). The proposed
site is Moss Road in Linwood, this was
previously used as a landfill site, with a
feasibility study to be undertaken.
Consultants have been carrying out the feasibility study,
with the final report due for completion in the coming
weeks.  Cross-council discussions and knowledge sharing
has also taken place with North Ayrshire Council who are
delivering a similar project, also on a former landfill site and
have carried out feasibility, business case modelling, site
investigations, planning, explored grid issues, and are
currently out for tender.
Climate Change
Response –
Programme
Governance
£125,000
Given the scale of the response to the
climate change by Renfrewshire Council
and the need to move this forward at
pace, a climate change officer post will
be recruited on 2 year fixed term basis,
with the initial focus of the role being to
support the drafting of the climate
change adaptation plan, the climate
change sub-committee and to take
forward proposed partnership and citizen
The Climate Emergency Lead Officer was appointed in
September 2021 and is now in post.
Page 64 of 192

Page 71

engagement forums on climate change
issues which have been identified by the
Climate Change Sub-Committee as key
priorities.
Community Food
Growing Proposal £50,000
It is proposed that a large-scale
community food growing initiative within
the Johnstone area is supported. 
As well as bringing land back into
purposeful use, the main aim of the
project would be to maximise the
availability of locally available and fresh
food to people experiencing financial
insecurity and/or health and wellbeing
issues.  It is anticipated that this project
will be progressed in partnership with
local community groups and
organisations, with clear links being
established to community justice
services, community projects and
organisations and local school and care
services to maximise community
involvement and benefit. 
A series of meetings involving local residents have been
held and a nucleus of active participants has been
identified. This core group of activists could form the
committee of a formally constituted group for future funding
applications, tenure arrangements, etc. Local people
visiting the site have identified that this large space already
performs roles as an informal recreational site and
biodiversity conservation resource, so recognise the scope
for this to become a multifunctional space. The group is
keen to investigate further these options to supplement the
main community food growing objectives. The Council’s
Biodiversity Officer has submitted grant application to
NatureScot in a bid to secure supplementary funding for
biodiversity enhancement works from the discretionary
portion of the Scottish Government’s Nature Restoration
Fund – outcome of the application yet to be announced by
NatureScot/Scottish Government. 
Renfrewshire Active
Travel Network -
Feasibility
£75,000
Investment in Renfrewshire’s Active
Travel Network is a priority of the
approved Economic Recovery Plan (Dec
2020). From an economic perspective
there are gaps in the strategic network
and to and from that strategic network,
that would better connect communities to
Specialist consultants have been working with
Regeneration & Place and Environment & Infrastructure
teams to develop an active travel strategy focused on
accessing the main areas of employment across
Renfrewshire.  A large scale survey and a significant
number of employer interviews has been conducted with
the support of the Renfrewshire Chamber of Commerce
Page 65 of 192

Page 72

places of work and study, town centres,
and other economic destinations.
Developing the network and its local
connections would be a significant driver
in offering attractive alternatives to the
use of private cars, particularly for short
journeys and make progress towards
delivering 20-minute neighbourhood
living across Renfrewshire. 
Benefits 
- reducing carbon emissions from travel 
- healthier lifestyles 
- more sustainable local economies and
services
and the Renfrewshire Economic Leadership Panel.  The
report with all of its recommendations to develop new
routes and initiatives to promote travel behaviour change
will be complete shortly and will act as a source document
for the development of specific projects for Council and
external funder support.
Town Centres Climate
Resilience
Programme
£75,000
A certain degree of climate impact is built
into established climate agreements
meaning that some level of climate
warming is expected, leading to greater
variability in climate including heat
events and wetter periods of the year.
Streets and public spaces in town and
local centres will have a role to play in
providing shelter and would benefit
economically by offering good
environments for people. Work is
required to develop a local response to
these issues aimed at delivering
programmes of beneficial interventions in
centres with property owners, residents
and users. 
This major piece of work will conclude shortly. The report is
in two stages with the first reviewing the extents of potential
climate impacts on Renfrewshire’s town centres and the
potential measures that should be given consideration; to
prevent significant disruption, to resolve ongoing pressures
on the levels of human comfort and useability due to
climatic factors and to assess new opportunities in town
centres with the emergence of new economic sectors that
could have a town centre presence.  Six projects have
been taken into a second more detailed stage for
development.  These relate to active travel, green/blue
infrastructure, measures to mitigate climate discomfort,
local food production and recycling/circular economy. 
Projects will be costed and at a point where further design
stages and/or businesses cases could now progress with
further funding. 
Page 66 of 192

Page 73

Benefits 
- more climate resilient communities 
- supporting local centres from further
economic impact 
- providing enhanced and local places as
attractive alternatives to those further
afield (e.g. climate controlled indoor
centres) - and therefore reducing the
need to travel
Peatland Restoration £10,000
The degradation and erosion of upland
and blanket peat bogs is contributing to
the loss of carbon sinks. There are
significant peatland resources in the
ownership of the council albeit under
tenancy to farmers on Glennifer Braes
and Muirshiel, and there are lowland
peat bogs within the extended site at
Bishopton. The feasibility of a
programme of peat moss restoration, as
part of the NatureScot (NS) programme -
Peatland ACTION, should be tested to
inform further discussions with owners,
tenants and conservation experts.
Benefits - carbon storage - enhanced
biodiversity - enhance water/flood
retention in upland catchment areas 
£10,000 is required to support an initial
feasibility study, so as to be well
positioned to bid for external funding
There has been good progress at two of the three
candidate sites identified by Renfrewshire Council and
agreed with NatureScot. 
The assessment of the potential for Sergeantlaw Moss has
been completed and works have been specified and
costed. Further progress has been limited by a land
ownership issue which is being investigated. This
investment  to date has been funded entirely from the
Peatland Action Fund. 
The survey of West Tandlemuir Farm has been completed
and identified an extensive peat restoration project to the
SW of the old Barytes Mine, which would require 20 weeks
for specialist contractors to complete at an estimated cost
of £210,776. Officers are liaising with NatureScot’s
Peatland Action team to identify the Council’s next steps for
this project. 
Peatland Action issued a tender for survey and feasibility
study work at Barochan Moss in 2021 but were unable to
award as a result of a lack of suitable bids.  Alternative
approaches are now being considered by NatureScot
Page 67 of 192

Page 74

from a national programme, Peatland
ACTION, which has £250m to invest
over the next 10 years.
although timescales have been extended as result of
resourcing issues within the Peatland Action Team.
Adaptation Plan –
Carbon Budget £50,000
Technical expertise is needed to support
the development of an evidence base in
Renfrewshire in relation to carbon
emissions, and the actions required to
achieve the net zero target set by
Council in 2019.
Phase one of this work, which relates to the baseline
evidence on carbon emissions is now completed.  Officers
worked with technical specialist consultants to calculate (for
both Renfrewshire Council as an organisation and
Renfrewshire area as a whole) the baseline emissions
(using 2014-15 as the baseline year); the current
emissions; and trajectories to 2030 using a best case and
worst case scenario.  The work also developed an
emissions monitoring tool which is based on an open data
platform and can therefore be updated as projects are
implemented and updated data is available.  Phase 2 will
commence shortly which will look holistically and
strategically at actions across all themes of the Plan for Net
Zero with the relevant costings associated to reach net
zero.
Business Survey &
Climate Change
Panel Survey
£20,000
Two immediate priorities are to carry out
a climate emergency survey of
Renfrewshire’s businesses and to survey
and then recruit a representative sample
of Renfrewshire’s population to
participate in a Climate Panel.
Both activities require to happen at pace
in order to influence the content of
Renfrewshire’s net zero plan and it is
proposed that using a research partner,
similar to the approach used for the
Council’s Public Services
The survey of local residents took place in September 2021
and the results were reported to the Climate Change Sub-
Committee. Members of Renfrewshire's Climate Panel
were successfully recruited from the respondents to the
survey.
The work to distribute the Business Survey was paused
due to the emergence of the Omicron variant and impacts
on the business community. The survey question set has
been developed by officers in partnership with
Renfrewshire Chamber of Commerce and scoped and
agreed by the Council’s consultant partner to carry out the
survey. It is anticipated that the survey will now be
Page 68 of 192

Page 75

Panel, will allow the administrative
element of this work to be completed in a
robust and independent manner.
launched in August, with the findings therefore available to
inform Phase 2, the action planning element of
Renfrewshire’s Plan for Net Zero.
Page 69 of 192

Page 76

Net Zero Business
Grant Support £100,000
This proposal aims to encourage local businesses to embrace
net zero ambitions and to support Renfrewshire’s goal of net
zero emissions by 2030. 
With one in three small businesses worried about rising energy
prices, including more than half of SMEs in hospitality and
leisure, this proposal ensures business get the support they
need to cut emissions and their bills at the same time.    
50% grant support (up to £10k per grant) will be offered to
support local businesses to make changes to business
premises and operations. For example, a move to low carbon
heating systems, solar powered energy and other measures to
reduce emissions. 
The grants will be delivered through the Economic
Development Team in line with other similar business grant
funds
The Net Zero Business Grant was
launched in May 2022. 
Applicants are required to submit
details benchmarking their existing
emissions, to be considered for the
grant the project should demonstrate
a reduction in carbon emissions from
this baseline.  Promotion of the fund
is ongoing and SMEs who have
expressed an interest in the fund
have been contacted.  
Energy Modelling –
East Fulton PS (in lieu
of Bridge of Weir PS)
£15,000
Proposal to undertake detailed energy modelling of East Fulton
PS (in lieu of Bridge of Weir Primary School) to facilitate
design and development of enhanced and integrated energy
efficient ‘Enerphit’ refurbishment options.  Note the specific
property is only being used as a data gathering archetype
model rather than funding works/improvements to that location.  
East Fulton PS is an archetype of a number of Primary
Schools in the portfolio and the modelling exercise/data will
inform potential options for other properties across the school
estate.
A specialist consultant has been
identified and engaged to undertake
detailed energy modelling. 
Further internal resources are now
being identified to survey and digitally
plot base information in response to
consultant technical requirements.
Page 70 of 192

Page 77

Charity Shop Pilot –
promoting the circular
economy
£5,000
The Council is working with a national organisation to develop
a charity shop pilot in Renfrewshire, which would help to
support objectives in relation to the circular economy. 
This would operate through a gift voucher model, aiming to
break the stigma and to promote the benefits of accessing and
reusing good quality items on sales within charity shops. 
The pilot will be small scale and will initially involve a shop in
the Paisley locality, with a view to this informing potential
options in other areas of Renfrewshire if successful. 
The gift vouchers would be available through local community
organisations in the first instance to people accessing support
and being interested in this type of option. 
Project is under the final stages of
development and it is anticipated that
pilot will commence prior to end of
2022. 
Sustainable
Procurement
Programme
£40,000 
As previously discussed by the Climate Sub-Committee, the
Council potentially contributes in the region of 3-4% of
Renfrewshire’s carbon emissions, and therefore the leadership
role of the organisation is crucial in terms of working with
citizens and businesses to reduce wider carbon emissions.  An
important element of leadership is through the Council’s
spending arrangements. 
Scottish public procurement legislation includes in law a
Sustainable Procurement Duty which requires that
procurement consider how our contracts can improve the
social, environmental and economic wellbeing of our own area
with a particular focus on reducing inequality.  The core
principles of the Sustainable Procurement Duty are reflected in
our Procurement Strategy and the goals and objectives for the
Following an external recruitment
process, the procurement manager
appointed a Climate Emergency
Adviser (CEA) in June this year on a
fixed term contract with a view to
practice being embedded within the
procurement team and across
services to guide all future activities. 
The CEA provides advice and
support to the procurement team to
ensure that the team have access to
the most up to date training,
guidance and resources which allow
the team to actively contribute to the
Council’s climate change ambitions.
Page 71 of 192

Page 78

procurement team and there is good practice across the
procurement team in this regard. 
The pace of change across markets and in terms of service
requirements in terms of sustainable procurement is
exponential, and it is essential that the Procurement function is
able to maximise sustainable procurement opportunities to
ensure contracting activities support net-zero aspirations
throughout the contract lifecycle, using all relevant tools and
support available and maximising engagement with supply
chains. 
Our ambition is to ensure that the Council not only keeps
abreast of best practice but has an opportunity to engage and
consult with our suppliers, our colleagues and the wider public
sector to help shape and form future Council policy and
innovation.  Funding from the Climate Change Action Fund will
help to develop initial resource to support: 
• The development of a clear framework for training and
development to ensure that our processes support
embedding sustainable procurement in all of our
practice and we actively contribute to the Council’s Net
Zero goal; 
• the development of an approach to monitoring and
recording climate change and circular economy
initiatives throughout the life of contracts; 
• active engagement with Economic Development to help
run events for local businesses about sustainable
procurement and to help them become more
sustainable and focused on tackling the Climate
Emergency; the development of cross functional
roadmaps for major and targeted impact areas setting
out key milestone and targets for action and
implementation. 
The CEA supports the team with the
completion of individual climate
literacy e-learning modules and helps
to ensure that the team understand
how they can effectively take account
of carbon in production, reduce
harmful emissions and promote
reduction in production of waste as
well as encouraging an increasingly
circular approach to specification of
our requirements for goods and
materials.  This learning is reflected
in new contract strategies and
throughout our entire tender
documents. 
The CEA works closely with the
Councils Climate Emergency Lead
Officer and the Green Economy
Officer to help maximise the impact
of procurement, exploring
opportunities for procurement to
support with the delivery of our
climate goals and our community
wealth building aspirations for our
local economy. 
Next steps for the CEA include
working with internal stakeholders
and colleagues in the wider public
sector to help establish a clear
framework for monitoring progress
and for managing contracts to
Page 72 of 192

Page 79

demonstrate the delivery of our
sustainability outcomes. 
Page 73 of 192

Page 80

Page 74 of 192

Page 81

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Developer Contributions – Annual Report
___________________________________________________________________ 
1. Summary 
1.1 At previous meetings of the Communities, Housing and Planning Policy Board
and the Planning and Climate Change Board it was agreed that an annual report
would be prepared detailing all developer contributions held by the Council. 
1.2 This report represents the annual report detailing developer contributions.   
1.3 This report details the monies received as a result of developer contributions
which are currently held by the Council.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
 Notes that this report represents the annual report to the Planning and
Climate Change Board in respect of developer contributions; and
 Notes the developer contributions which are currently held by the Council.
_________________________________________________________ 
3. Background 
3.1 At previous meetings of the former Communities, Housing and Planning Policy
Board and the Planning and Climate Change Board, it was agreed that an annual
report would be prepared detailing all monies held by the Council as a result of
developer contributions. 
3.2 This report represents the annual report as previously agreed.
Item 4
PACC230822 Page 75 of 192

Page 82

4. Monies Held 
4.1 The Council currently hold monies in respect of developer contributions which
relate to a number of developments.  It should be noted that recent reports
presented at the Planning and Climate Change Board reported some of the
monies held and as such they are repeated within this report for completeness. 
Section 50, Station Rise, Lochwinnoch 
4.2 £44,000 is currently held in respect of the Section 50 agreement which relates to
planning application 90/0661/PP, known as the Station Rise development. 
4.3 The £44,000 was recently the subject of a consultation exercise and it was
agreed at the meeting of the Planning and Climate Change Board in June that
the money would be distributed to local groups.  The money is therefore currently
in the process of being distributed to local groups as agreed. 
S69 Renfrew – Kings Inch Road/Ferry Road/Meadowside Street/Neil Street,
Renfrew 
4.4 £100,000 is currently held in respect of planning application 02/0660/PP for the
purposes of improving road transportation links to the development at Braehead.   
4.5 As previously reported a suitable project(s) will considered and details brought
to a meeting of the relevant board in due course. 
Fastlink Contributions 
4.6 £26,000 has been received in respect of Fastlink in connection with various
planning applications at King Inch Road, and Ferry Village, Renfrew. 
4.7 It should be noted that the Proposed Local Development Plan no longer requires
planning applications to contribute to Fastlink as the proposal is no longer being
progressed.   
4.8 Investigations are ongoing in order to identify applicants, signatories and
understand the terms of the agreements in question.   
S69 Abbotsinch Retail Park 
4.9 £40,000 is held in respect of a planning application at Abbotsinch Retail Park. 
4.10 The funds held relate to a sustainable transport contribution and more specifically
require to be used towards the installation of a pedestrian crossing on Renfrew
Road so as to facilitate pedestrian access to the application site from the bus
stop on Renfrew Road. 
4.11 The funds in question require to be spent by 1st June 2027. 
Page 76 of 192

Page 83

S75 Ferry Village, Renfrew 
4.12 £50,000 is held in relation to an art fund at Ferry Village, Renfrew. 
4.13 As previously report, we are currently seeking further advice in relation to the
funds held however it is the intention to liaise with relevant colleagues with a view
to commissioning a piece of artwork following a public competition which could
be sited in or around Ferry Village. 
Dargavel Village 
4.14 In line with the relevant legal agreement, the Council has recently received a total
of £225,000 from BAE systems in respect of the ongoing development at
Dargavel. 
4.15 The payment is broken down as follows: 
 £100,000 in respect of a contribution to the Newton Road Playing Field.  
 £100,000 in respect of a contribution to CCTV within the Dargavel
development.
 £25,000 in respect of costs associated with an Environmental Officer
employed by the Council. 
5. Future Monitoring 
5.1 Monitoring of S75 agreements and monies received will continue and an annual
report will be considered at the meeting of the Planning and Climate Change
Board in August 2023. 
6. Conclusion 
6.1 Funds are currently held by Renfrewshire Council in respect of the following
developments: 
 £100,000 in respect of improved road links to Braehead Shopping Centre;
 £40,000 in respect of a pedestrian crossing at Abbotsinch Retail Park;
 £50,000 in respect of an art fund at Ferry Village; 
 £26,000 in respect of various developments contributing towards Fastlink;
and 
 £225,000 in respect of the development at Dargavel Village including
contributions to Newton Road Playing Field, CCTV and Environmental
Officer. 
6.2 An annual report will be brought to the Communities, Housing and Planning
Policy Board which outlines the funds held with Renfrewshire Council in respect
of planning obligations and their purpose.
___________________________________________________________________ 
Page 77 of 192

Page 84

Implications of the Report 
1. Financial – monies should be released to the appropriate service as required to
meet the obligations set out in the associated legal agreement or returned to the
applicant where applicable.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal – Obligations will require to be discharged or varied where appropriate when
monies have been spent, returned or agreement is reached to repurpose the
funds.   
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None. 
13. Climate Risk – N/A.
___________________________________________________________________ 
Author:           David Love, Chief Planning Officer. 
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk   
Page 78 of 192

Page 85

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Renfrewshire Planning Performance Framework 2021 / 2022
___________________________________________________________________ 
1. Summary 
1.1 The purpose of this report is to present the eleventh Renfrewshire Planning
Performance Framework that is to be submitted to the Scottish Government
following this Board. The planning performance framework covering the
period 1 April 2021 to 31 March 2022 is available to view on the Council’s
website – Planning Performance Framework.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Notes the Renfrewshire Planning Performance Framework 2021 / 2022. 
___________________________________________________________________ 
3. Background 
3.1 A system of performance management has now been long established
between local authorities and the Scottish Government, whereby every
planning authority is asked to produce an annual planning performance
framework. 
3.2 The planning performance framework is not a policy document. It provides
planning authorities an opportunity to demonstrate continuous improvement,
changes implemented, achievements and lessons learnt over the year along
with anticipated service improvements for the coming year. 
Item 5
PACC230822 Page 79 of 192

Page 86

3.3 The framework was developed by the Heads of Planning Scotland to capture
and highlight a balanced measurement of planning performance, showing
commitment to the following areas: 
• Speed of decision making;
• Qualitative story of this year’s planning performance;
• Delivery of good quality development and design;
• Communication, consultation and engagement with our communities
and stakeholders;
• The added value that planning makes in decision making;
• How policies and guidance have shaped developments;
• Project management. 
4. Renfrewshire Planning Performance Framework 2021 – 2022 
4.1  This is the 11th year of reporting planning performance. Part 1, 2 and Part 3 of
the planning performance framework demonstrates how Planning has taken
into account the planning performance feedback from the Scottish
Government in 2021, providing case studies and examples of strategies and
projects where Planning has led or been a partner in as well as considering
the ongoing journey of changes and adaptations made to planning processes
and procedures over the year. 
4.2  Renfrewshire Planning Performance Framework also includes statistical
indicators at Part 4, 5, 6, and Part 7. These parts of the planning performance
framework indicate that Renfrewshire Council continues to perform well in
terms of the Scottish average. 
4.3 The planning performance framework demonstrates that Renfrewshire
Council is committed to continuous improvement in the service it provides in
its role as a local planning authority.    
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be
confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
Page 80 of 192

Page 87

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – Planning policy and guidance supports the re-use of vacant
and derelict land for a range of uses including those which can help address
the climate crisis by managing flood risk and providing biodiversity
enhancements.
___________________________________________________________________ 
Author: Sharon Marklow, Place Strategy Manager
Tel: 0141 618 7835, email: Sharon.marklow@renfrewshire.gov.uk 
Page 81 of 192

Page 88

Page 82 of 192

Page 89

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Development Plan Scheme 2022
___________________________________________________________________ 
1. Summary 
1.1 The Planning etc. (Scotland) Act 2006 requires planning authorities to prepare
an annual Development Plan Scheme setting out the programme for
preparing and reviewing their local development plan. 
1.2 The Renfrewshire Development Plan Scheme 2022 is available to view on the
Council’s website – Development Plan Scheme 2022. 
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the Renfrewshire Development Plan Scheme 2022. 
___________________________________________________________________ 
3. Renfrewshire Development Plan Scheme 2022 
3.1 The development plan scheme sets out the work required to prepare, engage
and consult on the Renfrewshire Local Development Plan 3. The next local
development plan will be informed by National Planning Framework 4 and a
Regional Spatial Strategy for the Glasgow City Region. 
3.2  Following the publication of National Planning Framework 4 and new Scottish
Government Development Planning Regulations, the timetable for preparing
the next local development plan for Renfrewshire will be updated and
Item 6
PACC230822 Page 83 of 192

Page 90

presented to a future meeting of the Planning and Climate Change Policy
Board. 
4. Next Steps 
4.1  The development plan scheme will be sent to the Scottish Ministers and will
be available to view online at Development Plan Scheme 2022.
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be
confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – The development plan is a key document in
establishing a land use framework for supporting, encouraging and delivering
economic development in Renfrewshire. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
Page 84 of 192

Page 91

13. Climate Risk – The local development plan supports the re-use of vacant and
derelict land for a range of uses including those which can help address the
climate crisis by managing flood risk and providing biodiversity
enhancements.
___________________________________________________________________ 
Author: Sharon Marklow, Place Strategy Manager
Tel: 0141 618 7835, email: Sharon.marklow@renfrewshire.gov.uk 
Page 85 of 192

Page 92

Page 86 of 192

Page 93

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Development Planning Guidance - Development in the Countryside
(2022) and Display of Advertisements (2022)
___________________________________________________________________ 
1. Summary 
1.1 This report presents guidance on Development in the Countryside and Display
of Advertisements.  The guidance supports the Local Development Plan (2021)
and the New Development Supplementary Guidance (2022).   
1.2 A copy of guidance on Development in the Countryside (2022) and the Display
of Advertisements (2022) is available on the Council’s webpages.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve the publication of the Development in the Countryside (2022)
guidance. 
(ii) Approve the publication of the Display of Advertisements (2022) guidance. 
___________________________________________________________________ 
3. Development in the Countryside 
3.1 The majority of Renfrewshire is rural countryside which is protected from
inappropriate development through its designation as green belt in the
Renfrewshire Local Development Plan (2021).   
Item 7
PACC230822 Page 87 of 192

Page 94

3.2 Renfrewshire’s green belt plays a key role in protecting and enhancing the
character, landscape, natural setting and identity of settlements, whilst
providing outdoor access to green networks which link areas and support nature
networks. 
3.3 This guidance supports the local development plan providing design advice
when considering and preparing development proposals within Renfrewshire’s
countryside. 
4.  Display of Advertisements Guidance 
4.1 Advertisements and signage provide information related to goods and services. 
They are often designed to be eye-catching and can enliven the street scene.
However, they can also have an impact on the character and appearance of an
area resulting in a cluttered and unattractive environment. 
4.2 This guidance provides good practice advice in relation to the display of
advertisements including the different types of signage, their design, size,
location, materials, illumination and relationship with the surrounding area. 
4.3 The guidance also sets out the circumstances where advertisements can be
displayed without the need for advertisement consent. 
5.  Next Steps 
5.1 Following approval by the Board, the guidance will be available online at the
Council’s webpages. 
5.2 The design advice will become a material consideration in the assessment of
new development proposals in the countryside and applications for
advertisement consent.
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal - None. 
5. Property/Assets – None. 
6. Information Technology – None. 
Page 88 of 192

Page 95

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – None.
___________________________________________________________________ 
Author:  Sharon Marklow, Place Strategy Manager
Tel: 0141 618 7835; email: Sharon.marklow@renfrewshire.gov.uk 
Page 89 of 192

Page 96

Page 90 of 192

Page 97

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Site Development Briefs – Barrhill Crescent, Kilbarchan, Land at
Blythswood, Renfrew & Blackhall Street, Paisley
___________________________________________________________________ 
1. Summary 
1.1 Site development briefs have been prepared for three development sites, at
Barrhill Crescent, Kilbarchan, a recently allocated residential site within the
Renfrewshire Local Development Plan (2021) and two brownfield sites at
Blythswood in Renfrew and a site off Blackhall Street in Paisley. 
1.2 The site development briefs identify a number of factors that require to be
considered and addressed in preparing development proposals for these
sites. 
1.3 The site development briefs will be a material consideration when considering
future planning proposals. 
1.4 A copy of the site development briefs can be viewed on the Council webpages
– Development Briefs.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve the site development briefs relating to the sites at Barrhill
Crescent, Kilbarchan, land at Blythswood, Renfrew and Blackhall Street,
Paisley. 
___________________________________________________________________ 
Item 8
PACC230822 Page 91 of 192

Page 98

3. Site Development Briefs 
3.1 The site development briefs set out a planning framework for potential
development sites. 
3.2 The site development brief highlights a number of considerations which
require to be taken into account when preparing a development proposal for
the site. 
The factors include: 
▪ Site context; 
▪ Site layout and building design; 
▪ Landscaping and boundary treatments; 
▪ Accessibility; 
▪ Sustainable urban drainage; 
▪ Renewables/Sustainability; 
▪ Digital connections; 
▪ Affordable housing; 
▪ Education provision; 
▪ Open space provision; and 
▪ Required supporting information. 
4. Next Steps 
4.1 If approved by the Board, the site development briefs will be placed on the
Council’s web pages and used to guide development proposals for these
sites. 
4.2 It is the intention that further site development briefs will be prepared for other
sites allocated within the Renfrewshire Local Development Plan (2021) and
these will be brought to the Board in due course.
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Reshaping our place, our economy, and our future – the proposed site
development briefs set out a framework for supporting, encouraging, and
delivering sustainability, climate change adaption, reaching Net Zero, biodiversity
gain and creating great places. 
4. Legal – None. 
Page 92 of 192

Page 99

5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – The proposed site development briefs seek to ensure that any
development coming forward is undertaken in a sustainable manner and aids
the adaption required as a result of climate change.
___________________________________________________________________ 
Author: David Love, Chief Planning Officer. 
Tel: 07483410182; Email:   david.love@renfrewshire.gov.uk 
Page 93 of 192

Page 100

Page 94 of 192

Page 101

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Renfrewshire Local Development Plan – Outcome of Court of
Session Appeal
___________________________________________________________________ 
1. Summary 
1.1 At the Communities, Housing and Planning Policy Board on 7 December
2021, it was agreed that the Renfrewshire Local Development Plan be
adopted in accordance with the provisions of The Town and Country Planning
(Scotland) Act 1997. The Local Development Plan was formally adopted on
15 December 2021. 
1.2 A statutory appeal was received by the Council on 20 January 2022 from
James (Glasgow) Ltd seeking to either quash one chapter of the local
development plan or the quashing of the allocations detailed within the local
development plan as they relate to the sites at Thriplee Road, Bridge of Weir
and the former Golf Driving Range, Rannoch Road, Johnstone. 
1.3 Legal opinion was sought from a QC and the advice provided to the Council
was that there is not any realistic possibility of defence to the appeal, in so far
as it seeks to quash the local development plan in relation to the Thriplee
Road and the Rannoch Road sites. However there was reasonable prospects
of defending the appeal to avoid quashing a whole chapter of the local
development plan - Delivering the Spatial Strategy – Places. 
1.4 The Council accepted this advice and sought to defend the appeal on this
basis. 
1.5 During the statutory appeal process, the Court requested that other interested
parties were made aware of the appeal by James (Glasgow) Ltd. The
interested parties included the owners / prospective developers for the site at
Auchenlodment Road in Elderslie.
Item 9
PACC230822 Page 95 of 192

Page 102

1.6 The outcome of the appeal has now been intimated to the Council. The Court
of Session decided allow the appeal and quash the Renfrewshire Local
Development Plan (2021) in the following respect:- 
 In relation to the Thriplee Road site in Bridge of Weir, to remove the green
belt designation, thereby showing it as ‘white space’ in the adopted
Renfrewshire Local Development Plan (2021); 
 Removing the residential designation of site at Golf Driving Range,
Rannoch Road, Johnstone, thereby showing it as ‘white space’ in the
adopted Renfrewshire Local Development Plan (2021); 
 In relation to Auchenlodment Road in Elderslie, to remove the green belt
designation, thereby showing it as ‘white space’ in the adopted
Renfrewshire Local Development Plan (2021). 
1.7 The outcome also found the Council liable to the appellants in the expenses
of the appeal in relation to James (Glasgow) Ltd.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Note the outcome of Statutory Appeal in respect of the adoption of the
Renfrewshire Local Development Plan; 
(ii) Note the award of expenses in relation to the appeal.
____________________________________________________________________ 
3. Background 
3.1 On 14 April 2021, the Communities, Housing and Planning Policy Board
authorised the Head of Economy and Development to modify the Proposed
Renfrewshire Local Development Plan in line with the Scottish Government
Reporter’s recommendations set out in the Examination Report, except for 3
recommendations, these were in relation to housing sties at: 
 the former Golf Driving Range, Rannoch Road in Johnstone (LDP
2057); 
 Thriplee Road in Bridge of Weir (LDP 2064); and,
 Auchenlodment Road in Elderslie (LDP 2053).   
The Board also authorised the Head of Economy and Development to notify
the Scottish Ministers of the Councils intention to adopt the modified local
development plan. 
Page 96 of 192

Page 103

3.2 The Council advertised the intention to adopt the Modified Proposed
Renfrewshire Local Development Plan and, on 30 April 2021, sent a copy of
the modified local development plan to the Scottish Ministers along with a
statement explaining why 3 modifications to the plan suggested by the
Reporter were not accepted.   
3.3 On 17 August 2021, the Scottish Ministers informed the Council that they may
proceed to adopt the plan. 
3.4 As a result of a judicial review, in relation to the local development plan
process, submitted by Cosmopolitan Hotels (14 May 2021), the formal
adoption of the local development plan was delayed until the conclusion of
this court action. 
3.5 On 7 December 2021 the Communities, Housing and Planning Policy Board
resolved to adopt the Renfrewshire Local Development Plan in accordance
with the provisions of the Town and Country Planning (Scotland) Act 1997.   
3.6 The local development plan was formally adopted on 15 December 2021
following the publication of a notice in the local press. 
4. Statutory Appeal 
4.1 In accordance with planning regulations any aggrieved party can submit an
appeal against the decision of a local authority to adopt a local development
plan. Such an appeal should be received within 6 weeks of the date of
publication of the above press notice. 
4.2 On 20 January 2022, Renfrewshire Council was served with an appeal in
relation to the adoption of the local development plan. 
4.3 James (Glasgow) Ltd (the appellant), sought the quashing of part or parts of
the local development plan, as set out as follows: 
(1) The chapter headed “Delivering the Spatial Strategy – Places”, together
with suspension of the operation of the chapter of that chapter of the
Local Development Plan; failing which, 
(2) In relation to the Thriplee Road Site, insofar as the Local Development
Plan designates that part of the Thriplee Road Site coloured green as
‘ENV1-Greenbelt; and 
(3) The designation of site LDP2057-Golf Driving Range, Rannoch Road,
Johnstone as ‘Policy P2-Housing Land Supply’ and its inclusion in the
list of ‘new residential sites’ on page 49; and any consequential
references (whether express or by inclusion on a map or plan), together
with suspension of the operation of the Local development Plan in
relation to that site; and/or 
Page 97 of 192

Page 104

(4) In such other respects as the Court considers appropriate in all the
circumstances of this appeal. 
4.4 The appellant is the owner of the site at Thriplee Road, Bridge of Weir. 
4.5 The appellant questioned the validity of the adopted local development plan.
The primary ground of challenge was that the Boards reasons and grounds for
declining to make the recommended modifications, as set out in the minute of
the meeting of the Communities, Housing and Planning Policy Board on 14
April 2021, were perverse and did not fall within the prescribed list of grounds
contained within the regulations.   
4.6 In submitting the appeal the appellants believe that the Communities, Housing
and Planning Policy Board used planning judgement.  In their view this
judgement lies outside the scope of planning regulations. 
5. Legal Advice 
5.1 Following receipt of the statutory appeal, the Council sought external legal
opinion from Alasdair Burnet QC.  The QC’s opinion outlined that there is no
realistic possibility of a successful defence to the challenge to the Board’s
decision to decline the modifications in relation to the site at Thriplee Road and
the former Golf Driving Range site.   
5.2 Notwithstanding the above, the opinion did though highlight that there were
reasonable prospects of defending the appeal to the extent of avoiding the
quashing of a whole of the chapter of the local development plans “Delivering
the Spatial Strategy – Place”, by instead accepting the quashing of the
particular local development plan allocations at Thriplee Road and the former
Golf Driving Range site. 
6. Appeal Procedures 
6.1 The Council responded to the Court of Session on 11 February 2022. The
response submitted stated that there was no need to quash the whole of the
chapter of the Local Development Plan entitled “Delivering the Spatial Strategy
– Places” given the quashing of the allocations in respect of the aforementioned
sites would be sufficient to address any prejudice towards the appellants.  In
addition, it is also noted that the quashing of the whole chapter would be
disproportionate and would impact many other parties who are relying on the
terms of the Adopted Renfrewshire Local Development Plan to respect of land
owned or potential development. 
6.2 The Court and the appellant accepted the Council’s position. In finalising the
appeal, a joint minute was prepared. On agreeing the joint minute, the Court
required intimation of the motion and the joint minute on interested parties,
namely the owners of the site at the Golf Driving Range, Rannoch Road in
Johnstone and Auchenlodment Road in Elderslie and for them to make any
representations they wish to make on the matter. 
Page 98 of 192

Page 105

6.3 The prospective developer for the Auchenlodment Road in Elderslie, Stewart
Milne Homes, intimated that they would be looking for the same action as the
appellant and that the land use allocation of the site at Auchenlodment Road be
quashed from the adopted Renfrewshire Local Development Plan (2021).   
7 Court of Session Judgement 
7.1 The outcome of the appeal has now been intimated to the Council as attached
at Appendix 1. The Court of Session decided allow the appeal and quash the
Renfrewshire Local Development Plan 2021 in the following respect: 
 In relation to the Thriplee Road site in Bridge of Weir, to remove the green
belt designation, thereby showing it as ‘white space’ in the adopted
Renfrewshire Local Development Plan (2021); 
 Removing the residential designation of site at Golf Driving Range,
Rannoch Road, Johnstone, thereby showing it as ‘white space’ in the
adopted Renfrewshire Local Development Plan (2021); 
 In relation to Auchenlodment Road in Elderslie, to remove the green belt
designation, thereby showing it as ‘white space’ in the adopted
Renfrewshire Local Development Plan (2021). 
7.2    The outcome of the appeal also found the Council liable to the appellants in
relation to the expenses of the appeal against James (Glasgow) Ltd. 
8 Next Steps 
8.1 This Court judgement now concludes the statutory process in relation to the   
Renfrewshire Local Development Plan (2021). 
8.2 The Council’s webpages and paper copies of the adopted Renfrewshire Local
Development Plan (2021) will include explanatory text providing information in
relation to the Court of Session judgement and how this effects the plan. 
8.3 The phrase ‘white space’ is defined in legal case law as a result of the courts
actions in relations to plans. Courts can only strike out/quash parts of or full
areas of plans. The effect of quashing the designation of three sites in the
local development plan is in effect leaving white space in a development plan. 
8.4 The Council still have a statutory obligation to consider and determine any
planning application submitted in respect of the three sites and would require
to take account the Reporters recommendations, the outcome of any court
proceedings as well as all of the other relevant policies in the local
development plan and any other material considerations, as outline in
planning legislation. 
Page 99 of 192

Page 106

8.5 The determination of planning application 19/0749/PP for a residential
development at the former golf driving range, Johnstone, will require to be
reconsidered by the Planning and Climate Change Policy Board following the
Court’s decision on the statutory appeal given that this site is no longer
designated as a potential residential site and is now ‘white space’. 
8.6 It is anticipated that the sites at Thriplee Road, Bridge of Weir and
Auchenlodment Road in Elderslie are likely to be progressed by land
owners/developers, given the ‘white space’ status in the adopted local
development plan.
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be
confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – Reshaping our place, our economy, and our
future - The Development Plan is a key document in establishing a land use
framework for supporting, encouraging, and delivering economic development
in Renfrewshire through investment and regeneration. 
4. Legal - The report concerns the adoption of the Renfrewshire Local
Development Plan, in terms of the Town and Country Planning (Scotland) Act
1997.  The report details that a statutory appeal has been determined in
respect of the adoption of the Local Development Plan. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None.
Page 100 of 192

Page 107

11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – The Local Development sets out a framework, spatial strategy
and policies to ensure sustainable development and places, aiming to facilitate
the transition to a low carbon economy and adaptation to climate change.
___________________________________________________________________ 
Appendix 1 – Interlocutor from the Court of Session  
___________________________________________________________________ 
Author: David Love, Chief Planning Officer. 
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk 
Page 101 of 192

Page 108

APPENDIX 1 – Interlocutor from the Court of Session 
Edinburgh, 29 June 2022    The Lords, on the appellants’ motion, of
consent, allow the joint minute between the appellants and respondents to be received and
marked No. 11 of process, and in terms and in respect thereof:- 
(i.) allow the appeal and quash the Renfrewshire Local Development Plan 2021 in the
following respects:-
(a) in relation to the Thriplee Road site (LDP2064) in so far as it designates that
part of the site coloured green as ‘ENV1- Greenbelt’; and
(b) the designation of site LDP2057 – Golf Driving Range, Rannoch Road,
Johnstone - as ‘Policy P2 – Housing Land Supply’ and its inclusion in the list of
‘new residential sites’ on page 49 thereof; and any consequential references
(whether express or by inclusion on a map or plan); 
(ii.) further, having seen and considered the unopposed written submissions from the
interested parties, viz. The Stewart Milne Group Limited and The Trustees of the AD
Houston Trust, Nos. 14 and 15 of process respectively, also quash the Renfrewshire
Local Development Plan 2021 in relation to the Auchenlodment Road site (LDP2053)
in so far as it designates the site as ‘ENV1-Greenbelt’ and decern;
(iii.) find the respondents liable to the appellants in the expenses of the appeal; remit the
account thereof, when lodged, to the Auditor of Court to tax; and
(iv.) find no expenses due to or by any party with regards to the involvement of the
interested parties in this appeal. 
Edinburgh, 29 June 2022     The Lords decern against the
respondents for payment to the appellants of the expenses referred to in the foregoing
interlocutor, of even date, as the same shall be taxed by the Auditor of Court. 
Page 102 of 192

Page 109

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  23 August 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading:  Tree Preservation Order Requests
___________________________________________________________________ 
1. Summary 
1.1 This report seeks to provide an update to the Tree Preservation Order (TPO)
requests which were agreed at the meeting of the Planning and Climate
Change Board in June 2022. 
1.2 In addition, this report also seeks to respond to requests to apply a TPO
designation to sites in Erskine, Paisley and Renfrew. 
1.3 The report also details requests for TPO designations which will be
considered in due course and reported back with recommendations to future
meetings of the Planning and Climate Change Board   
1.4 The requests submitted are considered in line with the relevant legislation,
namely, Section 160 of The Town and Country Planning (Scotland) Act 1997
as amended by the Planning etc (Scotland) Act 2006, and within the
procedures set out in the Town and Country Planning (Tree Preservation
Order and Trees in Conservation Areas) (Scotland) Regulations 2011. 
1.5 The report recommends that a tree preservation order is made in relation to
two of the sites proposed.   
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
(i) Confirm the tree preservation orders in respect of the sites known as
Sandieland Wood and Erskine Hotel Wood and agree that Officers make
the orders public and register them with the Land Registry for Scotland.
Item 10
PACC230822 Page 103 of 192

Page 110

(ii) Approve the need for a tree preservation order at site known as Old
Lane SINC and agree that officers proceed to prepare the order, serve it
on relevant parties and make the order available to the public and seek
representations. 
(iii) Agree that tree preservation order designation should not apply to the
sites at Kings Inch Road, Renfrew, and UWS Thornly Park Campus for
the reasons outlined in the report.
(iv) Note that consideration and assessment of the sites at woodland at
Kirklandneuk Park, Renfrew, Dykebar Hospital, a site located to the
south of Caplethill Road and site in Houston will be undertaken and the
findings and recommendations presented at a future meeting of the
Planning and Climate Change Board. 
___________________________________________________________________ 
3. TPO Requests Previously Considered 
3.1. At the meeting of the Planning and Climate Change Board in June 2022, it
was agreed that TPO designations would be placed on the following two sites:
 Sandielands Wood, Inchinnan; and
 Erskine Hotel Wood, located between the A726 and the Mutha Hotel. 
3.2. In line with the Renfrewshire Planning and Development Tree Policy 2022 and
the relevant legislation relating to Tree Preservation Orders, Officers have,
with regard to the two aforementioned sites, undertaken the following:
 Prepared the relevant orders and made them available online for review;
 Served the order on relevant parties including landowners;
 Published a public notice in the local press advising of the order; and
 Provided an opportunity for comments to be made by any interested party
in relation to either of the orders. 
3.3. The 28 day consultation period has now ended with no comments being
received in relation to either of the orders in question. 
3.4. It should however be noted that one comment was received in advance of the
order being published and noted comments in relation to the Erskine Hotel
Wood site as follows:
 The woodland in question is not located within the grounds of the Muthu
Glasgow River Hotel, the land holding of the hotel is adjacent;
 Part of the site is designated as a Site of Importance for Nature
Conservation (SINC);
 The majority of the site can be described as mature broadleaved woodland
however the area outwith the SINC is early mature plantation dating from
around 25 years ago;
 The conclusion that the woodland is in good/fair condition is open to
challenge;
 Should a TPO designation be made repeated applications for treeworks
are likely as a result of ash being impacted by ash dieback disease, elms
being reinfected with Dutch elm disease and horse chestnut causing
concerns as a result of infection by bleeding canker; and
 The plantation woodland is not 50-80 years old.
Page 104 of 192

Page 111

3.5. The above comments are noted and help to provide clarity to the site in
question and as such a response to the points noted above is detailed below,
in the same order as originally outlined:
 It is accepted that the woodland in question is located with the grounds of
the Muthu Glasgow River Hotel and is located in the land holding adjacent
to the hotel;
 It is accepted that part of the site proposed as a TPO is designated as a
Site of Importance for Nature Conservation (SINC);
 It is noted that the site comprises mature broadleaved woodland which is
dominated by sycamore and ash but which has a variety of other tree
species in the canopy.  In addition other areas have become colonised
over recent decades by ash and willow;
 It is considered that the woodland fits the category as ‘unmanaged –
good/fair condition’;
 It is accepted that treeworks applications will be required to enable the
future management of the trees in question;
 It is accepted that not all trees are 50-80 years old given that the site also
includes areas which have been colonised by trees more recently.  It is
considered that most of the canopy trees in question fall into the age range
of around 50-80 years old. 
3.6. Taking all of the above into consideration it is considered that the comments
do not alter the previous recommendation to apply a TPO designation to the
site known as the Erskine Hotel Wood. 
3.7. The Board are therefore asked to confirm the TPO designations in relation to
the following sites:
 Sandielands Wood, Inchinnan; and
 Erskine Hotel Wood, located between the A726 and the Muthu Hotel. 
3.8. Should the Board confirm the TPO designations, the confirmed orders will be
made available to the public and recorded in the Land Register of Scotland 
4. TPO Requests 
4.1. A number of other requests for tree preservation orders to be designated have
been received and to date three of the sites requested have been considered
and assessed, where appropriate.   
4.2. The sites in question are as follows:
 Old Lane SINC, Erskine;
 Kings Inch Road, Renfrew; and
 UWS Thornly Park Campus, Paisley. 
4.3. In light of the above, the requests have been considered and a
recommendation provided in respect of whether a TPO should be made.   
5. TPO Considerations 
Page 105 of 192

Page 112

Old Lane SINC
5.1. The Old Lane SINC is located to the north east of Kilpatrick Drive and
Kilpatrick Avenue, Erskine and is located between the road and the riverside
path following the River Clyde.  The woodland in question is detailed in
Appendix 1. 
5.2. The woodland comprises a series of generally linear bands of deciduous
trees, planted in the early 1990s to provide part of the landscape and
pedestrian access framework for an extensive planned business park on the
south side of the River Clyde in Erskine.   
5.3. The canopy has now reached a height of about 10m, and the best developed
trees have a girth (diameter at breast height) of about 30cm. A mixture of
mainly native and fast-growing tree species were selected for the main
plantings within the landscape strips, with non-native deciduous trees used as
boundary features – Grey Alder (Alnus incana) along prominent pedestrian
paths leading down to the Clyde Walkway and a striking avenue of Hornbeam
(Carpinus betulus) along the now blocked-off extension of Kilpatrick Drive. 
5.4. The body plantings were established within rabbit-proof fencing about 1m
high, and this barrier remains largely intact. The main species within these
areas are Ash (25% of the canopy), Silver Birch (25%), Grey Willow (25%)
and Goat Willow (10%). A variety of other woody species are present, e.g.
Broom, Blackthorn, Wych Elm (self-sown), Hazel (planted around the edges of
the tree belts), Elder, Hawthorn, Rowan, Hybrid Black Poplar, Downy Birch,
Pedunculate Oak (appearing as self-sown juvenile trees, Guelder Rose
(planted around the edges of the tree belts). 
5.5. The assessment of the site notes that the original planting concentrated on
fast-growing tree species to provide the desired screening effect. These
species are, however, relatively short-lived so thought needs to be given to
long term management of the woodland to ensure succession to woodland
dominated by non-pioneer tree species. 
5.6. In addition, the assessment noted that ash trees were showing clear signs of
Ash Dieback Disease, with juvenile stock already being killed by the infection.
The ash trees, currently making up about a quarter of the canopy, can be
expected to succumb in due course, so replacement actions need to be
planned as a priority. 
5.7. The woodland is mapped as Lowland Mixed Deciduous Woodland on the
Scottish Forestry Native Woodland Survey of Scotland. 
5.8. Taking into account all of the above, and notwithstanding the recent origin of
the woodland, it is recommended that the site in question justifies a TPO
designation in the interests of amenity of the local area. 
Kings Inch Road, Renfrew
Page 106 of 192

Page 113

5.9. This site is located on land north of Paterson Park Allotments, Kings Inch
Road, Renfrew.  The site in question is detailed in Appendix 2. 
5.10. The linear site previously comprised woodland of mainly hybrid poplar trees
mixed in with other canopy trees including sycamore, silver birch, goat willow,
ash, wych elm with the same species regenerating in the understorey along
with typical scrub species like elder and hawthorn. 
5.11. The woodland in question was removed by the landowner in 2021 and as
such the ground is now covered with a layer of shredded wood and bark with
stumps protruding. 
5.12. Recognising that the site comprised of fast growing species, following
assessment, none of the stumps suggested the trees in question were in
excess of 50 years old.  It is thought that up until at least World War 2 the site
had been occupied by a railway siding.  It is considered that the trees, now
removed, likely became established on the low railway embankment, perhaps
when Kings Inch Drive was first constructed following the demolition and
clearance of the Braehead Power Station in the 1980s. 
5.13. Given the current condition of the site, it is considered that the criteria required
for promoting a TPO designation have not been satisfied.  would be legally
indefensible. 
5.14. In light of all of the above, it is considered that a TPO designation should not
be applied to the site at Kings Inch Road. 
UWS Thornly Park Campus
5.15. The third TPO request relates to trees which are located within UWS Thornly
Park Campus.  The site in question is detailed in Appendix 3. 
5.16. It is significant to note that following an appeal to DPEA, planning permission
was recently granted in relation to the site for the erection of a residential
development comprising 179 units with associated access, landscaping and
ancillary works. 
5.17. As a result of the recent issue of planning permission by DPEA, officers have
obtained external legal advice in relation to the potential functioning of a TPO
on a site where planning permission has been granted for development. 
5.18. It is considered that applying a TPO designation to the site at UWS Thornly
Park would have no notable effect in regard to preservation of trees and carry
significant legal risks. 
5.19. The legislation granting the ability to make a TPO specifies that any TPO
made cannot prevent work on or removal of trees where this is authorised by
planning permission. Any TPO made at this site would therefore have no
effect in regard to trees that are scheduled to be removed or altered in terms
of the plans approved by the Reporter.
Page 107 of 192

Page 114

5.20. It is also noted that in considering the appeal in question, the Reporter had
regard to the loss of trees and the related habitats and was satisfied that the
matter could be dealt with by appropriate conditions.  A condition was in fact
attached to the planning permission by the Reporter requiring a landscaping
scheme to be approved by the planning authority before any development
commences. There has not been any significant change to conditions at the
site since the Reporter granted permission. There is therefore no justification
for adding a TPO to the restriction already placed on landscaping by this
condition.   
5.21. There is therefore no basis upon which a TPO could be made at this site.
Proceeding to make one would leave the Council open to a legal challenge,
potentially liable for significant compensation and would carry significant
reputation risk.   
5.22. For the reasons outlined above it is recommended that that a TPO
designation is not applied to the site at UWS Thornly Park Campus. 
5.23. Notwithstanding the above, the TPO request in relation to Thornly Park also
relates to a site located to the south of Caplethill Road which does not form
part of the site subject to planning permission.  In this regard it should be
noted that this site will be considered and assessed in due course and will be
reported to the Planning and Climate Change Policy Board at a future
meeting. 
6. Other TPO Requests
6.1. In addition to the requests outlined and assessed above, the following
requests for TPO designations have also been received:
 Woodland at Kirklandneuk Park, Renfrew
 Dykebar Hospital Grounds
 Site in Houston
 Site located to the south of Caplethill Road 
7. Next Steps
7.1. The TPO orders in respect of the sites at Sandieland Wood and Erskine Hotel
Wood are confirmed, made public and registered with the Land Registry for
Scotland. 
7.2. A TPO is prepared in respect of the woodland at Old Lane SINC.  Thereafter
the order will be served on the respective landowners and made available to
the public for comment. 
7.3. Following a period of public consultation, the TPO will be returned to Board to
take account of any comments received and to confirm, or otherwise the
order. 
Page 108 of 192

Page 115

7.4. Assessments will be undertaken in relation to the sites at Woodland at
Kirklandneuk Park, Renfrew. Dykebar Hospital, site located to the south of
Caplethill Road and  site in Houston.
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None 
4. Legal – The recommendations in the report would require for two separate
tree preservation orders to made in relation to the sites in question.  Should
the orders be confirmed they would require to be lodged with the Land
Register of Scotland. 
5. Property/Assets - None 
6. Information Technology - None 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website.   
8. Health & Safety - None 
9. Procurement - None 
10. Risk - None 
11. Privacy Impact – None 
12. COSLA Policy Position - None.
13. Climate Risk – The proposed site development briefs seek to ensure that any
development coming forward is undertaken in a sustainable manner and aids
the adaption required as a result of climate change.
___________________________________________________________________ 
Appendix 1: Site Plan – Old Lane SINC
Appendix 2: Site Plan – Kings Inch Road, Renfrew
Page 109 of 192

Page 116

Appendix 3: Site Plan – UWS Thornly Park Campus
___________________________________________________________________ 
Author: David Love, Chief Planning Officer
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk 
Page 110 of 192

Page 117

1:3,342
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417
I
0 50 100 150 20025
Meters
Date: 26/05/2022
Old Lane SINC
Page 111 of 192

Page 118

1:647
I
Date: 15/08/2022
User: hoburgessa1
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number
100023417.  Aerial Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright ©
All rights reserved. Aerial Photography 2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc
Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights
reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
Notes:
Please enter notes here
Kings Inch Road, Renfrew
Page 112 of 192

Page 119

1:1,000
I
Date: 15/08/2022
User: hoburgessa1
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number
100023417.  Aerial Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright ©
All rights reserved. Aerial Photography 2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc
Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights
reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
Notes:
Please enter notes here
UWS - Thornly Park
Page 113 of 192

Page 120

Page 114 of 192

Page 121

Renfrewshire Council Planning & Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.    19/0749/PP 
KEY  INFORMATION
Ward: (8)   
Johnstone South &
Elderslie 
Applicant:
Cruden Homes (West)
Ltd
C/O Architecture +
Design Ltd.
42 Charlotte Square
Edinburgh
EH2 4HQ 
Registered: 
1 November 2019 
RECOMMENDATION 
Grant subject to
conditions and a section
75 legal agreement. 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising 96 dwellings, with associated
open space, roads, access, landscaping, engineering
and infrastructure works 
LOCATION: 40 Rannoch Road, Johnstone, PA5 0SP 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is represented as ‘white space’ in the
Adopted Renfrewshire Local Development Plan (2021),
having no land use zoning due to the ruling by the Court of
Session on the 29 June 2022 in relation to a statutory appeal
into the local development plan. 
• 3 representations have been received which relate to the
impact from the additional traffic and implications for existing
junctions as a result of the development. The impact from the
existing contaminated land on site and the impact to the
existing operational quarry. 
• There have been no objections from consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the local development plan,
utilising a brownfield site for the purpose of regeneration and
provision of new homes to meet the overall housing land
supply in Renfrewshire.   
Alasdair Morrison
Head of Economy &
Development
Item 11(a)
PACC230822 Page 115 of 192

Page 122

Renfrewshire Council Planning & Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 19/0749/PP 
SITE ADDRESS  40 Rannoch Road, Johnstone, PA5 0SP 
PROPOSAL  Erection of residential development comprising 96 dwellings, with
associated open space, roads, access, landscaping, engineering and
infrastructure works. 
RECOMMENDATION Grant subject to conditions and a section 75 legal agreement. 
INTRODUCTION This planning application was considered at the meeting of the
Communities, Housing and Planning Policy Board on 18 January
2022, and it was agreed that the application be approved subject to
conditions and a Section 75 agreement. 
Following the decision at Board, officers had commenced discussions
with the applicant in order to agree and conclude a Section 75
agreement. 
On the 20 January 2022, Renfrewshire Council was served with a
statutory appeal in relation to the adoption of the Renfrewshire Local
Development Plan. 
The appellant, James (Glasgow) Ltd, sought the quashing of part or
parts of the Renfrewshire Local Development Plan, one of these parts
of the Plan subject to the appeal was 
(1) The designation of site LDP2057-Golf Driving Range, Rannoch
Road, Johnstone as ‘Policy P2-Housing Land Supply’ and its
inclusion in the list of ‘new residential sites’ on page 49; and
any consequential references (whether express or by inclusion
on a map or plan), together with suspension of the operation of
the Local development Plan in relation to that site. 
As highlighted in the earlier Renfrewshire Local Development Plan –
Outcome of Court of Session board report to this Board, the outcome
of the statutory appeal was that the Court of Session decided to allow
the appeal and quash the Renfrewshire Local Development Plan
(2021) in respect of 3 particular aspects, one of these being:- 
Removing the residential designation of site at Golf Driving Range,
Rannoch Road, Johnstone, thereby showing it as ‘white space’ in the
adopted Renfrewshire Local Development Plan (2021). 
Given this ruling by the Court of Session, the determination of
planning application 19/0749/PP for a residential development at the
former golf driving range, Johnstone, requires to be reconsidered by
the Planning and Climate Change Policy Board as this site is no
longer designated as a potential residential site and is now ‘white
space’. 
The phrase ‘white space’ is defined in legal case law as a result of the
Page 116 of 192

Page 123

Renfrewshire Council Planning & Climate Change Policy Board Page 3 
courts actions in relation to plans. Courts can only strike out/quash
parts of or full areas of plans. The effect of quashing the designation
of a site in the local development plan is in effect leaving white space
in a development plan. 
The Council still have a statutory obligation to consider and determine
any planning application submitted in respect of the three sites and
would require to take account the Reporters recommendations, the
outcome of any court proceedings as well as all of the other relevant
policies in the local development plan and any other material
considerations, as outline in planning legislation.   
PROPOSALS This application seeks planning permission for the erection of a
residential development comprising 96 detached, semi-detached and
terraced dwelling houses with associated access, infrastructure and
landscaping, on the site of the former golf driving range on Rannoch
Road, Johnstone.   
The site extends to approximately 5.8 hectares in area.  It is bound to
the north and west by residential properties and woodland, woodland
and Rannoch Road to the east with further residential units beyond,
around the southern end of the site is open space, woodland, a
commercial facility and an operational quarry. 
In terms of topography, the site rises upwards parallel to Rannoch
Road in a southerly direction. 
The former vacant and derelict driving range building and facilities
remain in situ. There is dense tree cover along the boundaries of all of
the site. The driving range area where the residential development is
proposed does not contain any trees.  The tree cover along the
boundaries of the site would be maintained. 
There would be several means of pedestrian access from the site to
the surrounding area. There would be one means vehicular access to
the site, located the lower (northern) end of Rannoch Road, around
the same position as the existing access to the site.   
Parking on site would be in line with the National SCOTs Guidelines
and consist of 238 parking spaces for both residents and visitor
parking.
An equipped play area would be formed at the southern boundary of
the site with an area of open space at the centre of the site with a
SUDS pond constructed at the north of the site, close to the vehicular
access. 
The proposed house types within the site, would be a mix three bed
semi-detached and terraced units and four bed detached. A mix of
private and affordable units will be provided on the site. 
SITE HISTORY Application No: 19/0734/EO
Description: Request for screening opinion as a requirement for an
Page 117 of 192

Page 124

Renfrewshire Council Planning & Climate Change Policy Board Page 4 
Environmental Impact Assessment relating to the erection of
residential development.
Decision: Environmental assessment not required. 
Application No: 19/0292/NO
Description: Erection of residential development with associated open
space, roads, access, landscaping, engineering and infrastructure
works
Decision: Accepted. 
Application No: 02/0720/PP
Description: Erection of a security fence and gates.
Decision: Grant. 
CONSULTATIONS Chief Executive Service (Roads Development) – No objection
subject to conditions. 
Communities & Housing Service (Environmental Protection
Team) – No objection subject to conditions. 
Children Services - No objections. 
Glasgow Airport Safeguarding - No objection subject to a condition. 
Scottish Water - No objection subject to conditions. 
SEPA – No objection subject to conditions. 
The Coal Authority – No objection subject to conditions. 
REPRESENTATIONS  Three representations have been received.  The points raised in the 
objections can be summarised as follows: 
• Traffic and road capacity issues on the local network as a result of
the development;
• Ground contamination/mining works likely to pose and issue with
development of this site; and,
• Potential impact on the operational quarry which is in close
proximity to the site. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan 2021
Policy P1 – Renfrewshire’s Places
Policy P2 - Housing Land Supply 
Policy P3 - Housing Mix and Affordable Housing
Policy I1 - Connecting Places
Policy I3 - Flooding and Drainage
Policy I5 – Waste Management
Policy I7 – Zero and Low Carbon Buildings 
Draft New Development Supplementary Guidance 2019
Creating Places
Connecting Places
Provision for Waste Recycling in New Developments
Page 118 of 192

Page 125

Renfrewshire Council Planning & Climate Change Policy Board Page 5 
Flooding and Drainage
Renewable and Low Carbon Energy Developments
Affordable Housing 
Material considerations
Renfrewshire's Places Residential Design Guide. 
PLANNING
ASSESSMENT
Policy P1 of the adopted Renfrewshire Local Development Plan is
considered to be applicable. The development is in line with and will
deliver on the local development plan spatial strategy by enhancing
and growing Renfrewshire’s communities in a sustainable manner. It
is considered that the development of this previously used site, with a
mix of house types and tenures in this location will assist in creating
sustainable communities and will make the area a more attractive
place to live. 
Policy P2 of the adopted Renfrewshire Local Development Plan
outlines that a 5-year supply of effective housing land is required to be
maintained at all times. The redevelopment of this site is considered
to add to the range and choice of residential sites across
Renfrewshire which is in line with Scottish Government policy as well
as local policy. 
Renfrewshire Council undertake an audit of housing land each year
and this land supply fluctuates as conditions change and decisions
are made. It is still considered that this site is necessary to ensure that
there is an adequate generous housing land supply across
Renfrewshire. 
Policy P3 of the adopted Renfrewshire Local Development Plan
relates to Housing Mix and Affordable Housing, which seeks
developments to provide a mix of house types to cater for current and
future needs as well as providing for a range of needs in terms of
occupants.   
Affordable housing should be provided on sites with over 50 units,
providing up to 25% of the total site capacity.   
In this regard, as the development is for 96 new residential units,
Policy P3 is applicable to this application. In response to this the
applicant has submitted an Affordable Housing Statement which
indicates that the applicant will provide 8 affordable homes, which on
balance is considered to be in line with the policy, to be delivered on
site, with the units being secured for affordable housing with a Section
75 Legal Agreement. 
The applicant’s statement justifies the number of affordable homes to
be delivered on site by outlining the following: 
• The Johnstone and Elderslie Housing Market Area contains the
highest existing proportion of social rented housing stock in
Renfrewshire and therefore has the lowest need for additional
social rented housing;
Page 119 of 192

Page 126

Renfrewshire Council Planning & Climate Change Policy Board Page 6 
• There is already a significant number of affordable units (social
rent) being delivered via the Renfrewshire Strategic Housing
Investment Plan (SHIP) within the local area, within ongoing
developments, such as Johnstone Castle (including phase 1 and
phase 2), Auchengreoch Road, MacDowall Street, Gibson
Crescent, Ryefield and Beith Road; 
• The range of house types and sizes being offered through this
proposal will suit varying budgets including starter homes or for
upsizers or downsizers in this area; 
• Cruden has carried out extensive market research within and
around the area and are proposing a development pitched at the
needs of the local market. 
It is considered that the applicant’s statement is correct in that Policy
P3 is to assist in rebalancing the range and choice of housing across
Renfrewshire. 
It is agreed that Policy P3 seeks up to 25% affordable housing on
sites and that Johnstone has around 3 times the amount of existing
affordable housing in comparison to the rest of Renfrewshire. The
figure of 8% affordable housing to be delivered on this site is
therefore, on balance, considered to be appropriate for this site. The
proposal will deliver the stock and tenure required for this area to
meet the range of local housing need and demand. 
In light of the points raised above, the proposals will included a range
of house types taking into account the make up of housing stock in the
local area. It is considered that the proposal to provide 8% affordable
homes on site is in line with Policy P3 of the adopted local
development plan. 
Development proposals must also comply with the criteria as set out
in the New Development Supplementary Guidance. The New
Development Supplementary Guidance and associated Residential
Design Guide identify a checklist of design considerations which form
the basis of good places design.  The design considerations are
assessed as follows. 
Context and Character
The proposed development is considered to respond to the context in
which it is sited, and replicates much of the surrounding area which is
characterised by residential units surrounded by a woodland edge. 
The proposed layout seeks to ensure that the development respects
the existing trees surrounding the site along with the significant level
changes. Again as is replicated on residential sites in the vicinity, the
proposed layout uses the site levels and containment of the existing
trees to present a good residential environment. 
The style of the dwellings proposed is of a modern design, with a mix
of detached, semi-detached and terraced properties which are linked
Page 120 of 192

Page 127

Renfrewshire Council Planning & Climate Change Policy Board Page 7 
together through the open space and woodland surroundings.   
It is considered the design and layout of the proposed development
will create an attractive place allowing the regeneration and renewal of
this land, contributing to the overall area. 
Access and Connectivity
A key consideration in the assessment of this application is
connectivity between the development and the wider transport
network. Policy I1 of the adopted Renfrewshire Local
Development Plan states that the Council will support development
proposals which give priority to sustainable modes of transport and
have no significant impact on the safe and efficient operation of the
local or trunk road network.   
The proposed development is considered to incorporate good active
travel linkages to the wider area including to the urban area as well as
the green network which surrounds this site.   
The layout incorporates good, well looked over, lit pedestrian links
between the site and the neighbouring houses at Burns Drive and
Rannoch Road and to the bus stop outside the site where there is a
good public transport service.  The proposed pedestrian links would
also link the new development to the local facilities and amenities
including all local schools. 
There is one vehicular access to and from the site, on to Rannoch
Road. This is considered acceptable for a development of this scale
and layout. 
The roads incorporated into the layout provide traffic calming
measures including; varying road widths, breaks in roadway and
changes in road material to ensure pedestrian safety in a key principle
in terms of movement around the site.
A comprehensive transport analysis has been submitted which
confirmed that the proposed development will not have a significant
impact on the local road network or junctions.
Sufficient residential and visitor parking will be provided and dispersed
throughout the site, in line with all guidelines.
Layout and Built Form
The layout contributes to permeability and ease of movement with
active frontages onto all streets, pedestrian routes and open spaces.   
The structure and position of buildings within the layout provide for a
sufficient level of privacy, amenity and garden ground for each
residential unit.   
It is recognised that some of the proposed residential plots which back
onto Rannoch Road, (which is used by traffic from the local quarry)
will be potentially impacted upon by road traffic noise.  In order to
Page 121 of 192

Page 128

Renfrewshire Council Planning & Climate Change Policy Board Page 8 
mitigate this impact, recommendations made in the noise impact
assessment with respect to upgraded glazing, will be required for
these plots.  There is also a significant tree barrier along this edge of
the site which will be retained to ensure the amenity of future
residents. 
An air quality assessment is required in respect of any potential
impacts from the nearby quarry.  The consultation response from the
Environmental Protection Section is noted in this regard and the
requirement for this could be controlled by condition on any approval
issued. 
There are no other surrounding land uses which will have a significant
adverse effect on the proposed residential development.   
Environment and Community
There is considered to be a sufficient provision of amenity and
recreational open space within the development, with one equipped
play space and one natural play / area of open space.   
The indicative block plan associated with the application identifies
open spaces with planting and the dense tree cover around the site
boundaries being retained.  A detailed landscape and planting
strategy requires to be submitted as part of the application and will be
secured via conditions.   
Glasgow Airport Safeguarding have requested the submission of a
more detailed landscaping strategy, to ensure there would be no
impact with respect to the attraction of birds.  This can be secured via
condition on any approval issued. 
With respect to Policy I3 of the adopted Renfrewshire Local
Development Plan and the supplementary guidance on Flooding and
Drainage, the proposed development was concluded to have no
detrimental impact in this regard. 
A drainage assessment has been submitted and considered
satisfactory for development. A sustainable urban drainage system
has been incorporated into the layout. 
In view of the above, the proposed development is considered to
comply with Policy I3 of the adopted local development plan and the
associated supplementary guidance. 
Buildings and Design
The proposed dwellings are of modern design and are considered to
positively contribute to the built environment and the overall character
of the place. 
In terms of density and form, a range and choice of units, of varying
sizes has been provided by the development.
Finishing materials proposed are complementary to the surrounding
Page 122 of 192

Page 129

Renfrewshire Council Planning & Climate Change Policy Board Page 9 
area. 
In view of the above, the proposed development is considered to
comply with the New Development Supplementary Guidance on
places development and the associated residential design guide. 
Policy I7 of the adopted Renfrewshire Local Development Plan
relates to Renewable and Low Carbon Energy Developments and
seeks for all major developments to consider renewable energy
sources, particularly the use of a district heating network (or other low
carbon alternatives).   
The applicant has submitted an energy statement which explores all
the options in terms of providing the development with renewable/low
carbon means of energy provision.
The report concludes 4 suggested outcomes for achieving maximum
energy efficiency within the development, these being; 
• Combi gas boilers and heat recovery.
• Air sourced heat pumps and heat recovery.
• Electric heaters and heat recovery.
• Heat network and heat recovery. 
While the heat network appears financially unviable, the option would
be left open to connect to any future external system.  The other
proposed options would contribute to a reduction in energy use within
the development, coupled with building specifications for maximum
heat retention.  As such, it is considered that the development suitably
complies with Policy I7 of the adopted local development plan. 
Site Characteristics 
There have been no objections to the application from any of the
consultees, however Roads raised concerns with regards construction
on the site, given the historical mining operations which had taken
place.  The Coal Authority and the Council requested that the
applicant undertake significant site investigation works, to determine
the level of risk with regards historical mining works.  The conclusion
reached by the Coal Authority was that the level of risk, was below the
threshold that would require them to object to building within this area. 
They have requested mitigation measures are put in place to ensure
this and this can be controlled by conditions on any approval issued. 
To further mitigate any potential risk, a condition will also be imposed
that the site shall be developed in phases and additional site
investigation works carried out as the development is ongoing. 
In relation to contaminated land, there has been extensive
investigations undertaken in relation to the fact that the site is
brownfield and previously used. The Environmental Protection Section
is satisfied that the level of assessment and remediation strategy for
the site is satisfactory and throughout the development phases this
will be verified by the on-going reports submitted to the Council to
ensure the development is undertaken in a comprehensive manner. 
Page 123 of 192

Page 130

Renfrewshire Council Planning & Climate Change Policy Board Page 10 
Representations
There were three objections to the proposals which related to traffic
generation and infrastructure capacity, issues of building over existing
mining works and contamination of the site as well as the potential
impact to the existing quarry operations. 
The impact of the development as a result of the additional traffic
generation and infrastructure capacity have been addressed in the
foregoing assessment.   
The operators (Tarmac) of the local High Craig quarry have not
objected to the application, however wanted to ensure the
development would have no impact on their existing operations. 
Again the applicant has demonstrated through various assessments
that any new residents will not be significantly impacted by the
existing quarry operations. There are mitigatory measures proposed
to ensure that the residential amenity will not be impacted. 
Conclusion
Having given consideration to the above assessment, it is found that
the proposals comply with the policies and guidance of the Council. 
It is considered that the proposal would be in a sustainable location.  It
would deliver a well-designed housing site within an appropriate
setting and would support the objectives of delivering the spatial
strategy of the local development plan which focuses on creating good
places within existing built up areas on brownfield and previously used
land. 
RECOMMENDATION Grant subject to conditions and a section 75 legal agreement. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material consideration which outweighed the presumption in favour of
development according with the Development Plan. 
A section 75 legal agreement requires to be concluded to secure the provision of
affordable housing units. 
Conditions 
1         Prior to the commencement of development on site:   
A Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained within
the site investigation report, prepared in accordance with current
authoritative technical guidance, shall be submitted to, and approved in
writing by, the Planning Authority.   
Reason - To ensure that the site will be made suitable for its proposed use. 
Page 124 of 192

Page 131

Renfrewshire Council Planning & Climate Change Policy Board Page 11 
2. That prior to the occupation of any dwellinghouse (within an identified
phase of development) hereby approved;   
a) A Verification Report confirming completion of the works specified
within the approved Remediation Strategy, (for that phase of development),
shall be submitted to, and approved in writing by, the Planning Authority. 
b) If remediation works are not required, but soils are to be imported to
the site, a verification report confirming imported soils are suitable for use
on the site, shall be submitted to, and approved in writing by, the Planning
Authority.   
Reason - To demonstrate that works required to make the site suitable for
use have been completed. 
3. That before development starts, full details and/or samples of the facing
materials to be used on all external walls and roofs shall be submitted to,
and approved in writing by, the Planning Authority.  Thereafter only the
approved materials shall be used in the development of the site.   
Reason:  These details have not been submitted. 
4. That the mitigation measures identified in 'Table 6' of the Noise Impact
Assessment prepared by KSG Acoustics (for Cruden Homes), shall be
implemented on plots 01-19.   
Reason - To ensure that road traffic noise is adequately mitigated at these
plots. 
5. That prior to the commencement of development on site, full details and/or
samples of the materials to be used for all hard surfaces within the
development hereby approved shall be submitted to, and approved in
writing by, the Planning Authority.  Thereafter only the approved materials
shall be used in the development of the site.   
Reason - A full specification detailing finishing materials has not been
submitted. 
6. That before development starts, full details of the design and location of all            
boundary treatments associated with the dwellinghouses to be erected on
the site shall be submitted to, and approved in writing by, the Planning
Authority. 
Reason:  These details have not been submitted.   
7.        Prior to the occupation of each dwellinghouse hereby permitted, all
boundary treatments associated with the dwellinghouse, approved under the
provisions of condition 6 shall be erected;   
Reason:  To safeguard the amenity of future residents.   
8. That before any development of the site commences a scheme of
landscaping shall be submitted to and approved in writing by the Planning
Authority ; the scheme shall include:- (a)  details of any earth moulding and
Page 125 of 192

Page 132

Renfrewshire Council Planning & Climate Change Policy Board Page 12 
hard landscaping, grass seeding and turfing;  (b)  a scheme of tree and
shrub planting, incorporating details of the number, variety and size of trees
and shrubs to be planted;  (c)  an indication of all existing trees and
hedgerows, plus details of those to be retained, and measures for their
protection in the course of development, and  (d)  details of the phasing of
these works.   
Reason:  In the interests of the visual amenity of the area and to avoid
endangering the safe movement of aircraft and the operation of Glasgow
Airport through the attraction of birds and the increase in the bird hazard
risk of the application site. 
9. That prior to occupation of the last dwellinghouse within the development
hereby permitted, all planting, seeding turfing and earth moulding included
in the scheme of landscaping and planting, approved under the provisions
of Condition 8 above, shall be completed; and any trees, shrubs, or areas of
grass which die, are removed, damaged, or diseased within 5 years of the
completion of the development, shall be replaced in the next planting
season with others of a similar size and species.   
Reason:  In the interests of amenity.   
10. No development shall take place until full details of soft and water
landscaping works have been submitted to and approved in writing by the
Planning Authority. Details must comply with advice note 3 "potential bird
hazards from amenity landscaping and building design" (Available at
www.aoa.org.uk/publications/safeguarding.asp).   
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority
in consultation with Glasgow Airport.  The scheme shall be implemented as
approved thereafter.   
Reason: To avoid endangering the safe movement of aircraft and the
operation of Glasgow Airport through the attraction of birds and an increase
in the bird hazard risk of the application site. 
11 Before development commences on site, mitigation measures for mine
entry 242661-003 shall be submitted to, and approved in writing by, the
Planning Authority.  (Which shall also include details of restrictive fencing
and any landscaping).   
The approved measures shall then be implemented before any
dwellinghouse is occupied.   
Reason: To ensure the mine entry mitigation measures are implemented
precisely. 
12 That before development commences on site, a phasing plan for the
development of the site shall be submitted to and approved in writing by the
Planning Authority, (which shall include details of proposed site
investigation works).  
Page 126 of 192

Page 133

Renfrewshire Council Planning & Climate Change Policy Board Page 13 
Reason: To allow further site investigation to be carried out as works
progress on site. 
13. The before the first unit is occupied, the applicant shall undertake and
submit a survey for written approval by the Planning Authority, that the
Local Air Quality Management Objectives for the pollutants (in particular
PM10 and PM2.5) specified in the relevant Air Quality Regulations, made
under Part IV of the Environment Act 1995, shall not be exceeded at any
location at or in the vicinity of the development where "relevant exposure" is
liable to occur. In addition, the overall significance of the air quality impacts
from the development shall be assessed and clearly defined within the
report with mitigation proposed where required. The survey and report shall
adhere to the methods and principles set out in the Scottish Government
publication "Local Air Quality Management Technical Guidance
LAQM.TG(16)" and the EPUK guidance document "Land-Use Planning &
Development Control: Planning for Air Quality (2017)" or a method that has
been agreed with the Planning Authority. The assessment should consider
the introduction of new receptors into an area of potentially high particulate
levels due to the proximity of the quarry.   
Reason: In the interests of environment and air quality. 
14.      That prior to the commencement of development, the applicant shall submit
for the written approval of Renfrewshire Council as Planning Authority, an
Arboricultural Method Statement and Tree Management and Maintenance
Plan for the site. For the avoidance of doubt, the Arboricultural Method
Statement shall contain details of the existing trees, shrubs, hedgerows and
how the trees will be retained and protected (and measures for their
protection) on site through the construction phase and future use of the site
along with a comprehensive Tree Management and Maintenance Plan
which will contain details on the monitoring of growth and condition of
existing trees. As well as this there is the requirement for a scheme of new
tree, shrub and hedge planting and grass seeding and/or turfing; measures
to promote biodiversity gain at the site, the phased implementation of the
proposed landscaping, and details of the management and maintenance of
landscaped areas. The scheme thereafter approved shall be implemented
on site in accordance with the phasing plan, and maintained thereafter in
accordance with the maintenance details. 
Reason: To ensure that works are undertaken to a satisfactory standard in
the interests of natural heritage and to ensure a suitable landscape strategy
is developed for the site in the interests of visual amenity and biodiversity. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483 419705.       
Page 127 of 192

Page 134

Renfrewshire Council Planning & Climate Change Policy Board Page 14 
Page 128 of 192

Page 135

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.    22/0142/PP 
KEY  INFORMATION 
Ward: (5) Paisley East
and Central 
Applicant:
Kelvin Properties
Lonend Ltd.
90 Mitchell Street
Glasgow
G1 3NQ 
Registered: 
04 March 2022 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Demolition of existing office
building and erection of sixty seven flats with associated
access, landscaping, open space and parking. 
LOCATION: 2 Lonend, Paisley, PA1 1SS 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P1 of the Adopted
Renfrewshire Local Development Plan (2021). 
• One representation has been received raising issues in
relation to neighbour notification; flooding; ground
contamination; traffic flow; dust generation; and noise. 
• There have been no objections from consultees. 
• The proposals are considered on balance to be compliant
with the relevant policies and guidance of the Local
Development Plan, utilising a brownfield site for the purpose
of regeneration and provision of a mixed range of housing
types.     
Alasdair Morrison
Head of Economy &
Development
Item 11(b)
PACC230822 Page 129 of 192

Page 136

Renfrewshire Council Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0142/PP 
SITE ADDRESS  2 Lonend, Paisley, PA1 1SS
PROPOSAL  Demolition of existing office building and erection of sixty seven flats
with associated access, landscaping, open space and parking.
RECOMMENDATION Grant subject to conditions 
PROPOSALS Planning permission is sought for the demolition of an existing office
building and the erection of sixty seven flats, at a maximum height of 5
storeys, with associated access, landscaping, open space and parking
at 2 Lonend, Paisley. 
The application site extends to approximately 0.59 hectares and
currently accommodates a long term vacant office building and
associated car parking.  
Vehicular access to the development would be from Lonend onto
Saucel Street via the existing road network. In the interests of
permeability, pedestrian / cycle linkages are also proposed through
the site to existing development and amenities. 
The site is bordered by flats to the north, the Watermill Hotel and
White Cart to the east, Mecca Bingo to the south east, a public car
park to the south and further residential development to the west. 
SITE HISTORY Application No: 21/1621/PN
Description: Demolition of existing office and development of
residential properties with associated access and landscaping
Decision: Accepted 
Application No: 21/1704/EA
Description: Demolition of existing office and development of
residential properties with associated access and landscaping.
Decision: Environmental Assessment Not Required 
Application No: 20/0362/PP
Description: Demolition of existing building and erection of residential
development comprising eleven dwellinghouses and thirty eight flats
with associated roads, parking & infrastructure
Decision: Withdrawn   
Application No: 03/0751/GD
Description: Internal alterations, removal of one door and 
replacement window, provision of condenser compound, smokers' 
shelter and bicycle shed to area of soft landscape at car park.
Page 130 of 192

Page 137

Renfrewshire Council Planning and Climate Change Policy Board Page 3 
Decision: No objections.   
Application No: 03/0154/AD
Description: Display of an internally illuminated box sign, a fascia sign,
a wall panel sign and a free standing sign.
Decision: Withdrawn 
CONSULTATIONS Chief Executive’s Service (Roads Development) – No objections,
subject to conditions. 
Communities & Housing Services (Environmental Protection
Team) - No objections, subject to conditions. 
Education (Children’s Services) – No objections subject to a
financial contribution in respect of education provision at St. Andrews
Academy. 
Glasgow Airport Safeguarding - No objections, subject to
conditions. 
Scottish Water - No objections. 
West of Scotland Archaeology Service - No objections. 
SEPA – No objection. 
Network Rail – No objections. 
REPRESENTATIONS  One letter of representation has been received which objects to the
proposed development. The substance of which can be summarised
as follows: 
1. Neighbour notification letters were not received timeously. 
2. Concerned that flooding could be made worse as a result of
this development, particularly with land raising proposed. 
3. The capping layer if still proposed to address ground
contamination, compounds the land raising issue. 
4. If the proposal makes the situation worse, in terms of traffic
flow, then what measures are going to be implemented to
maintain, or preferably improve, the status quo. 
5. Concerned by the dust that will be generated not only from the
construction works, but from the demolition of the current
building which could impact the useability of neighbouring
gardens. 
6. Concerned by the increased noise that will be generated from
the proposed 67 dwellings when they are occupied. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021)
Policy P1: Renfrewshire’s Places  
Policy P3 Housing Mix and Affordable Housing
Policy I1: Connecting Places 
Policy I3: Flooding and Drainage 
Page 131 of 192

Page 138

Renfrewshire Council Planning and Climate Change Policy Board Page 4 
Policy I5: Waste Management 
Policy I7: Zero and Low Carbon Buildings
Policy I8: Developer Contributions 
New Development Supplementary Guidance (2022)
Delivering the Places Strategy and Affordable Housing 
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; and Flooding and
Drainage 
Delivering the Environment Strategy: Noise   
Material considerations
Renfrewshire's Places Residential Design Guide March 2015
PLANNING
ASSESSMENT
The application site is covered by Policy P1 of the Adopted
Renfrewshire Local Development Plan which notes a general
presumption in favour of a continuance of the existing built form.  Any
proposal requires to be compatible and complementary to the existing
uses and character.  In this regard, the proposed residential
development, can be considered, in principle to be capable of positive
consideration given the nature of the neighbouring uses and the
existing character of the area.
In addition, it is considered that the proposed redevelopment of the
site will result in a long-term vacant brownfield site being returned to
an active and beneficial use. 
It is considered the detailed design, layout and access arrangements,
of the proposal requires to be assessed against the approved
guidance set out in: Designing Streets, the Council’s Residential
Design Guidance; Policies P1, P3 I1, I3, I5, I7 and I8 of the Adopted
Local Development Plan and the associated New Development
Supplementary Guidance. 
Policy P3 – Housing Mix and Affordable Housing, set out in the
Adopted Renfrewshire Local Development Plan (2021) is also
applicable to the assessment of the proposals, as it seeks to ensure
that on residential sites, a mix of housing types are encouraged to
meet current and future housing needs and support sustainable mixed
communities in Renfrewshire. 
In this regard, the applicant has provided an additional statement in
relation to the proposal being in compliance with Policy P3. 
The intention of Policy P3 – Housing Mix and Affordable Housing is for
the applicant to demonstrate that the housing proposed in the
submission meets the terms of Policy P3, in placemaking terms, not
just housing numbers.
Page 132 of 192

Page 139

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
In line with Scottish Planning Policy and the Adopted Renfrewshire
Local Development Plan, affordable housing provision can be across
a range of tenures including low cost housing without subsidy.
In this case the applicant has advised that they have no capacity
financially to deliver the redevelopment of the site and offer any
provision of affordable housing within the scheme. 
In this regard and in considering this position, an independent review
has been undertaken of the applicant’s overall costings for the site
and it’s redevelopment. This assessment concludes that based on a
100% private housing scheme whereby there was no requirement for
affordable housing provision, due to the significant abnormal
development costs associated with the site, a profit margin of 6.5%
would be returned. This would be significantly below the typical 20%
threshold that a developer would seek to bring a site forward. The
level of abnormal costs would also not have been known at the time of
purchase.
Whilst this position would see the development as contrary to the
provisions of Policy P3, having considered the findings of this report
and analysis and taking into consideration the prominence of this site
as a gateway to the town centre, which is presently long term vacant,
a decision must be taken as to whether the redevelopment of the site,
without an affordable housing provision, as suggested, would be the
most appropriate solution in this instance to ensure the longer term
redevelopment of the area. It should be noted that a previous
application for the redevelopment of this site was withdrawn recently
following a long period of consideration due to development
restrictions and the current application seeks to provide an alternative,
deliverable scheme if this approach can be considered acceptable. 
The type of housing proposed on this site would add to the overall
housing mix in the area and there is considered to be a range and
choice of homes, types and tenures in and around this immediate
area and in the Renfrew Housing Market as a whole.    
In summary, taking all considerations above into account, it is felt that
the proposed development can be considered in a positive manner, in
this instance, as it would bring a long term derelict site into an active
and beneficial use and would meet the wider principles of the Local
Development Plan. 
On such sites, which are considered to be acceptable in principle, the
development requires to be assessed in detail considering layout,
design and other aspects of the proposals against the criteria for
implementing the Spatial Strategy of the Development Plan and the
Council's New Development Supplementary Guidance. 
Page 133 of 192

Page 140

Renfrewshire Council Planning and Climate Change Policy Board Page 6 
This assessment is as follows: 
1) Residential Amenity
The proposal adopts the general ‘place’ qualities set out in the
Supplementary Guidance and within Designing Places and the
Council's own Residential Design Guidance in that the layout creates
a development which provides an enhancement of the area whilst
creating a development which is respectful of the wider established
land uses. 
The proposal sets out a residential layout which respects privacy,
provides a reasonable outlook, with appropriate amenity space
achieving a good and well considered development pattern for the
site. 
The proposal complies with the Renfrewshire Local Development Plan
Policy P1, the associated Supplementary Guidance and the Places
Checklist in that the development would adequately respond to the
surrounding areas, by achieving appropriate residential frontage and
streetscape as well as a well connected network of pedestrian and
cycle links.
2) Streets and Surface Finishes 
Designing Streets requires developers to consider the creation of
successful places and streets over the movement of the car, which
this layout has incorporated. 
Traffic calming measures including varying road widths and changes
in road material have been demonstrated.  
These would aid to reduce driver speed and create a safe residential
environment.  
Overall, the proposals put forward are to the satisfaction of Roads
Development in this regard. 
3) Road/Cycle/Pedestrian Network and access to Amenity Spaces 
Pedestrian and cycle links are integral to the layout and would provide
a permeable layout for pedestrians and cyclists to the town centre and
local facilities. 
The site would also offer acceptable routes to local schools. 
These routes would be adequately overlooked as per the requirement
of the Places Development Criteria set out in the Supplementary
Guidance. 
Page 134 of 192

Page 141

Renfrewshire Council Planning and Climate Change Policy Board Page 7 
Access to the site for vehicles would be taken from Saucel Street, as
per the existing road network layout, in the interests of sustainability. 
Whilst parking provision would be below the minimum requirements,
given the town centre location and proximity to public transport
options as well as local public car parks, this is considered acceptable
on this occasion, and has been agreed with Roads Development for
these reasons.
4) Design, Plot Configuration and Finishing Materials
At the site frontage on Lonend and along the extended access road
internally within the site, properties adequately address the road
network.
In terms of density and form, the units proposed vary from three
storey to four/five storey (flats), within an area of mixed development
types. 
Given the spacing proposed between the unit blocks it is not
considered that the variance in building heights would have a
detrimental impact on the amenity of any existing or proposed
residential dwelling within the area, in accordance with the provisions
of Designing Streets.  
Finishing materials also respect existing built form surrounding the
application site, reflecting the modern development adjacent as well
as the colours and tones of the more historic buildings in the wider
vicinity. 
5) Boundaries and Open Space
The development benefits from an existing large area of open space
at Saucelhill Park to the south west, with a private Locally Equipped
Play Area also proposed within the development to the north east for
residents of the development itself. 
Active frontages would address small landscaping pockets within the
development itself also. 
Soft (hedging & shrubbery) boundary treatments are to feature within
the development, with fencing locations to create definition. 
6) Landscaping
The planting specification contained within the landscaping proposals
for the site are considered acceptable in ensuring an appropriate level
of residential amenity and sense of place.  
7) Water Management and Site Levels
Page 135 of 192

Page 142

Renfrewshire Council Planning and Climate Change Policy Board Page 8 
The drawings and documentation submitted adequately address the
requirements for drainage and sewerage provision at the site, to the
satisfaction of SEPA.
Site levels existing and proposed would not give rise to any concerns
in terms of residential amenity, in accordance with the requirements of
Policy I3.
Policy I5: Waste Management – Appropriate waste management
solutions have been proposed internally within the overall
development layout. 
With regard to Policy I7, the applicant has demonstrated through their
Energy Statement submission that the development not only meets
the 15% CO2 reduction through installation of Low or Zero Carbon
Generating Technologies but exceeds it on average by 8.1%. To
achieve the sustainability and carbon reduction requirements as
outlined in the current legislation additional Solar PV Panels are
proposed to further ensure compliance with the requirements of Policy
I7. 
In addition to the above, the proposed development requires to be
assessed against Policy P3 and Policy I8 of the Adopted Local
Development Plan.
Policy P3 seeks to ensure that development proposals provide a mix
of housing types and tenures to meet current and future housing
needs and support sustainable mixed communities. 
In addition, Policy I8 relating to Developer Contributions is of
relevance and as previously noted Education (Children’s Services)
have advised that a financial contribution towards education provision
at St. Andrew’s Academy is required.
Taking account of policies P3 and I8, in this case the applicant has
advised that there are significant viability issues which impact on their
ability to develop the site and provide the required level of affordable
housing and a financial contribution towards education provision at St.
Andrews Academy.
The applicant has advised that they are not in a position to provide
any affordable housing and are not able to provide a financial
contribution in respect of education.  
In this regard the applicant has submitted a viability assessment.  The
applicant’s viability assessment has been assessed by an
independent consultant to assist in verifying the information submitted.
The independent consultant has advised that they have considered
Page 136 of 192

Page 143

Renfrewshire Council Planning and Climate Change Policy Board Page 9 
the overall viability and profitability of the proposed development and
the impact of incorporating affordable housing and a financial
contribution in respect of education.  The assessment has taken
account of all costs including those associated with the purchase of
the site, demolition and construction, abnormal costs and
contingencies.  In addition, new build comparables within the local
area have been reviewed in order to consider sales potential and
expectations.   
The independent consultant has carried out an appraisal based on the
site coming forward with 100% private sale housing and no education
contribution as well as an appraisal based on the delivery of 25%
affordable housing on site and the required education contribution
(albeit it is accepted that the affordable housing provision is likely to
be less than 25% as a result of the housing submarket area).  
In both scenarios outlined above, the result of the respective
appraisals conclude that the proposed development would result in a
profit margin which is significantly below the minimum 20% which is
normally required by developers.  The profit margins in question are
calculated at 6.5% and 3.04% respectively.  
In light of the above, it is accepted that the development of the site
both with and without the required affordable housing provision and
education contribution is not considered to be viable at this point.  The
applicant has indicated that should consent be granted a reduced
profit margin together with some value engineering would be required
in order to allow the development to proceed.
In all regards, taking account of the affordable housing requirement
and the developer contribution in respect of education, the
assessment and conclusions made by the independent consultant, it
is considered that the proposed development is not compliant with
Polices P3 and I8 of the Adopted Local Development Plan.
Notwithstanding the above, it is accepted that the application site is a
long term vacant and derelict site located on the edge of Paisley Town
Centre.  The site is considered to be a key route into Paisley and as
such the proposed development offers the opportunity for the 
redevelopment of a long-term vacant brownfield site and return it to an
active and beneficial use.  In addition, the proposed redevelopment of
the site will assist in helping to enhance the wider amenity and place
in this key site in Paisley.
The proposed development also requires to be considered with regard
to all relevant policies of the Adopted Local Development Plan 2021
and all relevant material considerations.  
Page 137 of 192

Page 144

Renfrewshire Council Planning and Climate Change Policy Board Page 10 
In this instance, given the proposed development is capable of
positive consideration against all relevant LDP policies, with the
exception of Policies P3 and I8, and recognising the viability issues
affecting the site and indeed the opportunity for a long term vacant
and derelict brownfield site, located on a key route into Paisley, to be
returned to an active and beneficial use, in this instance and on
balance, it is considered that the proposed development can be
viewed in a positive manner.
In response to the comments raised by the objector above, it is
understood that neighbour notification letters were received and the
opportunity to make representations was extended to allow for any
possible delays encountered. 
With regard to levels and the potential for flooding, the proposed
external development levels will generally remain as the current site
levels with the exception of the building finished floor levels, which
have been raised to reflect the recommendations within the Flood
Risk Assessment Report. The FRA report confirms that the new
building slightly encroaches onto the 1 in 200-year functional
floodplain at the northeast corner with minimal impact, and SEPA
have raised no objections to the overall development in terms of flood
risk. 
No requirement for a capping layer to address contamination at this
stage. However, in the event a capping layer was required, this will
not impact on the development levels. The ground levels would be
reduced, and a capping layer added to reflect site requirements,
therefore, no land raising required or proposed in this respect.
Roads are satisfied with the overall layout of the development, subject
to conditions. 
In terms of nuisance from noise and dust, appropriate planning
conditions have been attached to control these matters should
consent be approved.
Recommendation and reasons for decision      
In light of the above assessment, the proposals, whilst not in
accordance with all relevant policies of the Adopted Local
Development Plan, the proposed development is considered on
balance to offer a significant enhancement to the area which would
return an edge of centre, long term brownfield site to an active and
beneficial use and is considered to meet the principles of the LDP 
and on balance can be supported. In all regards it is therefore
recommended that planning permission be granted subject to
conditions. 
RECOMMENDATION Grant subject to conditions 
Page 138 of 192

Page 145

Renfrewshire Council Planning and Climate Change Policy Board Page 11 
Reason for Decision 
The proposal is considered to the meet the principles of the Local Development
Plan and although not in accordance with all relevant policies, it is considered that
the viability of the site is a material consideration.  In this regard it is considered, on
balance, that the proposed development would return an edge of centre, long term
brownfield site to an active and beneficial use. 
Conditions 
1. That before development starts, full details of the design and location of all
fences and walls to be erected on the site shall be submitted to, and approved in
writing by, the Planning Authority. 
Reason:  These details have not been submitted.   
2. That before any of the flats situated on a site upon which a fence is to be erected
is occupied, the fence, or wall, for which the permission of the Planning Authority
has been obtained under the terms of conditions 1 above, shall be erected. 
Reason:  To safeguard the amenity of future residents.   
3.That no development shall take place until full details of soft and water
landscaping works have been submitted to and approved in writing by the Planning
Authority, details must comply with Advice Note 3 ‘Potential Bird Hazards from
Amenity Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). These details shall include the
species, number and spacing of trees and shrubs No subsequent alterations to the
approved landscaping scheme are to take place unless submitted to and approved
in writing by the Planning Authority in consultation with Glasgow Airport. The
scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard
risk of the application site. 
4.That prior to occupation of the last dwellinghouse/flat within the development
hereby permitted, all planting, seeding turfing and earth moulding included in the
scheme of landscaping and planting, hereby approved, shall be completed; and
any trees, shrubs, or areas of grass which die, are removed, damaged, or diseased
within 5 years of the completion of the development, shall be replaced in the next
planting season with others of a similar size and species. 
Reason:  In the interests of amenity.   
5.Prior to commencement of any construction works on site, the developer shall
submit for the written approval of the Planning Authority, full details of the bin
stores proposed within the development hereby approved and their location.
Thereafter, the bin stores erected shall be in accordance with the detail finally
approved. 
Page 139 of 192

Page 146

Renfrewshire Council Planning and Climate Change Policy Board Page 12 
Reason: In the interests of visual and residential amenity. 
6.Prior to the commencement of any construction works on site, the developer shall
submit for the written approval of the Planning Authority:- 
a) a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended
therein
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the site
investigation report prepared in accordance with current authoritative technical
guidance.
Reason: To ensure that the site will be made suitable for its proposed use. 
7. Prior to occupation of any residential unit hereby approved, the developer shall
submit for the written approval of the Planning Authority:-
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; and/or
b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use.
Reason: To demonstrate that works required to make the site suitable for use have
been completed. 
8.Prior to the commencement of any construction works on site, the developer shall
submit a revised Noise Impact Assessment for the written approval of the Planning
Authority. Thereafter any mitigation required shall be implemented to the
satisfaction of the Council as Planning Authority before any of the flats are
occupied. 
Reason: In the interests of residential amenity. 
9. Development shall not commence until a Bird Hazard Management Plan has
been submitted to and approved in writing by the Planning Authority in consultation
with Glasgow Airport. The submitted plan shall include details of management of
any flat/shallow pitched/green roofs on buildings within the site which may be
attractive to nesting, roosting and “loafing” birds. The management plan shall
comply with Advice Note 8 ‘Potential Bird Hazards from Building Design’ The Bird
Hazard Management Plan shall be implemented as approved, on completion of the
development and shall remain in force for the life of the development. No
subsequent alterations to the plan are to take place unless first submitted to and
approved in writing by the Planning Authority in consultation with Glasgow Airport. 
Reason: It is necessary to manage the development in order to minimise its
attractiveness to birds which could endanger the safe movement of aircraft and the
operation of Glasgow Airport. 
10. Prior to occupation of the final unit fronting Lonend, the footways fronting the
development shall be resurfaced to the satisfaction of the Council as Roads
Page 140 of 192

Page 147

Renfrewshire Council Planning and Climate Change Policy Board Page 13 
Authority. 
Reason: In the interests of amenity and pedestrian safety. 
11. Prior to the commencement of any development works on site, the applicant
shall submit for the written approval of Renfrewshire Council as Planning Authority,
a Construction Traffic and Environmental Management Plan. For the avoidance of
doubt, this plan shall demonstrate how, during demolition and build phase, there
will be no detrimental impact on the environment such as through dust or the local
transport network through congestion. 
Reason: In the interests of traffic and pedestrian safety.   
12. Prior to occupation of the first dwelling within Block A of the development
hereby approved, the developer shall complete for use, the provision of the LEAP
area in accordance with the detail approved. Maintenance of the play area shall be
in accordance with a scheme to be agreed between the developer and the
individual occupiers of the development or a factor appointed to act on their behalf. 
Reason: In the interests of residential amenity.       
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.       
Page 141 of 192

Page 148

Page 142 of 192

Page 149

Renfrewshire Council Planning and Climate Change Policy Board 
Page 1
Planning Application: Report of Handling 
Reference No.    22/0178/PP 
KEY  INFORMATION
Ward: (12) Erskine and
Inchinnan 
Applicant: Stewart
Milne Group Ltd 
Registered: 
17 March 2022 
RECOMMENDATION 
Disposed to grant
subject to the conclusion
of a Section 75 legal
agreement and
conditions 
PROSPECTIVE  PROPOSAL: Residential development
comprising fifty nine dwellinghouses and twenty four flats,
including access, drainage, landscaping and associated
works. 
LOCATION: Site Between Sandieland Wood and Florish
Road, Erskine 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P2 ‘Housing Land
Supply Site’ of the Adopted Renfrewshire Local Development
Plan (2021). 
• Eleven representations have been received which relate to
loss of greenbelt; access arrangements and additional traffic
as a result of the development; the type of development
proposed; availability of services; trees; displacement of
wildlife; attraction of vermin; and ownership. 
• Objection from Inchinnan Community Council. No objections
from other consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the Local Development
Plan, providing residential development within a Housing
Land Supply site, including the provision of affordable
homes.   
Alasdair Morrison
Head of Economy &
Development
Item 11(c)
PACC230822 Page 143 of 192

Page 150

Renfrewshire Council Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0178/PP 
SITE ADDRESS  Site Between Sandieland Wood and Florish Road, Erskine
PROPOSAL  Residential development comprising fifty nine dwellinghouses and
twenty four flats, including access, drainage, landscaping and
associated works.
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal
agreement and conditions 
PROPOSALS Planning consent is sought for the erection of a residential
development on a site between Sandieland Wood and Florish Road,
Erskine. The proposed development would comprise fifty nine
detached dwellinghouses and twenty four flats, including access,
drainage, landscaping and associated works. 
The site comprises approximately 3.9 hectares of agricultural land on
the edge of Erskine. To the west, the site is accessed off a
roundabout at the junction of Florish Road and Torran Drive, which is
included within the site boundary. 
The site is comprised of part of two larger fields, subdivided by a post
and wire fence and undefined along their eastern boundaries. An area
of tree planting identified as the ‘Sandieland Wood’ is located partially
within the east of the site.  It should be noted that Sandieland Wood is
currently the subject of a TPO designation. and no trees within this
area will be affected by the proposed development.   
Residential development backs onto the majority of the western
boundary of the site, beyond a tree belt approximately 10 metres wide
that is to be retained. The northern boundary is similarly enclosed by
residential development and a tree belt. The south-western boundary
of the site runs along the edge of the CALA Homes development
currently under construction (Northbar Phase 1), with the adjacent
development sitting at a higher level (circa. 5m). 
During consideration of the planning application the proposed site
layout was amended. The two blocks of flats were repositioned from
the rear of the site to the front of the site. The proposed pathway
within Sandieland Wood removed, the wastewater pumping station
relocated from the edge of Sandieland Wood and replaced with a play
area and the detached housing layout altered to accommodate these
changes. 
SITE HISTORY Application No: 21/1587/PN
Description: Erection of residential development including access,
drainage, landscaping and associated works
Decision: Accepted.   
Application No: 21/1647/EA
Description: EIA Screening Opinion
Decision: Environmental Assessment not required.   
Page 144 of 192

Page 151

Renfrewshire Council Planning and Climate Change Policy Board Page 3 
CONSULTATIONS Communities & Housing Services - (Environmental Protection
Team) – No objections subject to conditions.
Chief Executive’s Service (Roads Development) – No objections,
subject to conditions.
Children’s Services – No objection subject to the provision of a
financial contribution in respect of education facilities within the
catchment of the proposed development. 
West of Scotland Archaeology Service – No objections, subject to
conditions.
Glasgow Airport Safeguarding - No objections, subject to conditions 
Scottish Environmental Protection Agency - No objections.   
The Coal Authority - No objections. 
Scottish Water – No objections. 
Inchinnan Community Council – Object to the proposals on the
basis of the potential disruption to and degradation of a currently,
rarely disturbed woodland with a rich variety of flora and fauna
(including several protected and red listed species) as well as the
effect on surrounding farmland. Concern is also raised in relation to
the scope and accuracy of an Ecological Assessment Report
conducted by Envirocentre on behalf of Stewart Milne Homes. 
It is requested that a new Ecological Impact Assessment is
undertaken which represents the true nature of the site and its wildlife
as well as the risks this development poses to them. It is
recommended that a detailed ornithological survey is performed at an
appropriate time of year, over a longer period. Other considerations
include: a robust green boundary between the development and
farm/woodland, retention of scattered/tree lines at boundaries of the
site, retention of deadwood and a preference of locally native tree
species in any planting scheme (unless proven that non-native
species outperform/have greater environmental contribution). 
A second representation has been submitted from Inchinnan
Community Council in response to additional information submitted by
Envirocentre on behalf of the developer in response to the Community
Council’s initial objection. 
In summary, Inchinnan Community Council still consider the
development should not go ahead. It would result in the loss of
another grassland habitat, the survey work carried out has been
insufficient to assess the impact on birds, bats and other wildlife, no
trees should be removed; it is too close to Sandieland Wood; a
substantial buffer should instead be introduced; wildlife habitat may be
impacted; there is no guarantee mitigation measures will be
implemented; that development would see the loss of protected sites
in the wider area, it would have a cumulative impact to habitats as a
Page 145 of 192

Page 152

Renfrewshire Council Planning and Climate Change Policy Board Page 4 
result of increased population and would be contrary to local and
regional biodiversity and conservation objectives.
REPRESENTATIONS  Eleven letters of objection have been received, the substance of
which, relevant to the consideration of the current application can be
summarised as follows: 
1. The pressure an additional 59 houses and 24 flats would have on
the existing schools, GP’s and dentists in the area. 
Response: Comments noted and have been considered in the
allocation of this site as an additional housing site through the
acceptance of the current Adopted Local Development Plan 2021. 
2. Concerned at the volume of traffic this would result in on Florish
Road and emissions from vehicles. 
Response: In consultation with Roads Development and
Environmental Services, no objections have been raised in this regard
to the proposals. 
3. The roundabout at the bottom of the Gilchrist Gardens development
is very small and the proposed additional properties would result in a
lot more traffic going through this roundabout. 
Response: In consultation with Roads Development no objections
have been raised in this regard to the proposals. 
4. The lack of public transport at this end of Florish Road is very
disappointing. If additional houses are built there should be a bus
service added that would come along Florish Road. The Cala
development with many extra dwellings on Florish Road has already
led to a significant increase in traffic. This was supposed to have
brought a new bus stop on Florish Road which has still not
materialised.
Response: Noted and being progressed by Cala in association with
Scottish Passenger Transport (SPT). 
5. Concerned at the loss of trees and green area at the back of 
houses which will have a negative impact on view as well as a
significant impact on wildlife and biodiversity.
Response: Some edge trees along the site boundary will be required
to be removed to allow access to the site and to allow some of the
development to be formed. However, no trees are to be lost within the
woodland currently being promoted for TPO designation (Sandieland
Wood). The applicant has also confirmed compliance with the relevant
legislation with regard to any potential displacement of wildlife.  In
addition, the loss of a view is not a material consideration.
6. The development will result in a loss of privacy as the proposed
development will have houses built directly up to back fences.
Response: The proposed development layout allows for sufficient
separation distances to be achieved between dwellings in accordance
with the relevant guidance. 
Page 146 of 192

Page 153

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
7. The location of the development will have a negative impact on
residents due to the building works in relation to noise. To have
another development right on our back door before the Cala
development is finished is unfair.
Response: Noise associated with the construction phase of the
development is not a permanent nuisance and Environmental
Services have raised no objections in this regard. 
8. Worry about the lack of affordable housing on offer. Not everyone
has the funds to buy a house at the current prices on the market.
Housing is required which is affordable and accessible to residents
with different types of finances, this is particularly important with the
current living crisis and inflation at an all time high. 
Response: Noted and Policy P3 allows for a range of affordable
options to be offered such as sheltered housing which the
development includes. 
9. The proposed location of the apartment blocks, due to their
substantial size and height will have a severe material impact on
surrounding property with regards to light, privacy and noise.
Response: Noted and is considered in the main body of this report. 
10. There is a huge housing development in Dargavel why does
further development in Erskine have to continue.
Response: Comments noted and have been considered in the
allocation of this site as an additional housing site through the
acceptance of the current Adopted Local Development Plan 2021. 
11. No meaningful civic space within the area. 
Response: A proposal of this scale does not require the delivery of
civic space. Adequate provision of open space provision has been
provided within the development layout in accordance with the
requirements of the Adopted Local Development Plan 2021. 
12. The appellant's Ecological Assessment is inadequate and does
not reflect reality as there is a substantial number of species within the
woodland and surrounding area that have been neglected in the
report.
Response: Noted and is considered in the main body of this report.  
13. Feel the development should go ahead given the high demand for
homes in the area, however concerned that the layout does not allow
the natural continuation of Florish Road as a main road should
development take place east of the site as planned many years ago.
Response: In consultation with Roads Development no objections
have been raised in this regard to the proposals.  In terms of
development taking place to the east of the site, no proposals have
been submitted and the site is not an allocated site within the Adopted
Local Development Plan 2021.
14. There are 2 blocks of flats planned despite there being a high
Page 147 of 192

Page 154

Renfrewshire Council Planning and Climate Change Policy Board Page 6 
demand for family homes in Erskine, and low demand for flats. 
Response: The flats proposed are for sheltered housing.
15. Development will see a loss of Greenbelt. 
Response: The site is no longer zoned as Greenbelt and is allocated
as a housing site within the Adopted Local Development Plan 2021
where Policy P2 Housing Site applies.
16. Lack of police presence. 
Response: Not a material planning consideration. 
17. Roundabouts are designed for cars not people walking. 
Response: Noted and the applicant has incorporated walking links
within the development and to existing provision. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan 2021
Policy P2: Housing Land Supply Sites
Policy P1: Renfrewshire's Places 
Policy P3: Housing Mix and Affordable Housing
Policy I1: Connecting Places 
Policy I3: Flooding and Drainage 
Policy I5: Waste Management 
Policy I7: Zero and Low Carbon Buildings
Policy I8: Developer Contributions 
New Development Supplementary Guidance
Delivering the Places Strategy: Places Development Criteria and
Places Checklist and Housing Mix and Affordable Housing
Delivering the Infrastructure Strategy: Connecting Places; Flooding
and Drainage; Provision for Waste Recycling in New Developments;
and Zero and Low Carbon Buildings 
Delivering the Environment Strategy: Trees, Woodlands and Forestry 
Renfrewshire Planning & Development Tree Policy 2022 
Material considerations
Renfrewshire's Places Residential Design Guide March 2015
Site Development Brief, Land East of Florish Road, Erskine 
PLANNING
ASSESSMENT
The proposal requires to be assessed against the policies contained
within the Development Plan and any other material considerations. 
In this case the relevant Development Plan comprises the Adopted
Renfrewshire Local Development Plan 2021 (LDP) and the New
Development Supplementary Guidance (SG). 
The application site is identified in the LDP proposals map under
Policy P2 'Housing Land Supply Sites'.  Policy P2 supports and
encourages residential development on these sites as additional
allocated housing sites to meet identified housing requirements. In
light of the LDP allocation, the principle of housing development on
the site is accepted.  Appendix 1 of Renfrewshire’s Housing Land
Supply documentation identifies the application site as having an
Page 148 of 192

Page 155

Renfrewshire Council Planning and Climate Change Policy Board Page 7 
indicative capacity of 90 units.  The development of these sites
requires to comply with the criteria set out in the New Development
Supplementary Guidance. 
Given the number of units proposed Policy P3 is also applicable to the
assessment of the proposals. Policy P3 requires that residential
proposals demonstrate how they meet local housing need and
demand providing a mix of housing on all residential sites. A mix of
housing to meet specific housing needs requires to be considered,
including housing for older people and less able residents, along with
the delivery of starter homes and smaller units. Affordable housing
requirements will require to be addressed in all residential
developments where 50 or more dwellings are proposed providing up
to 25% of the total site capacity in line with the New Development
Supplementary Guidance. The appropriate housing mix for the locality
and viability of the development will be key considerations in the
delivery of new affordable housing. 
In this case, the applicant proposes the provision of twenty four (six
one-bed and eighteen two-bed) affordable sheltered housing units
within the development, which equates to approximately 29% of the
overall development and therefore complies with the provisions of
Policy P3. Affordable housing provision can be delivered across a
range of tenures, including social housing for rent, mid-market rented
accommodation, shared ownership housing, shared equity housing,
housing sold at a discount (including plots for self-build), and low-cost
housing without subsidy and as such the proposals offered are
considered to suitably satisfy this criteria. 
The New Development Supplementary Guidance, Places
Development Criteria, sets out a number of criteria which new
residential developments are required to meet.  It considers that
development proposals require, to ensure that the layout, built form,
design and materials of all new developments are of a high quality;
density to be in keeping with the surrounding areas while surrounding
land uses should not have an adverse effect on the proposed
residential development and that the development proposal should
create attractive and well connected street networks which facilitate
movement.  In addition, Renfrewshire Places Design Guide sets out
standards in relation to separation distances, layouts, parking
provision and open space.  Assessing the development in terms of
these criteria, the following conclusions can be made. 
Development density is considered appropriate for this location and
fits with the surrounding area. The form, layout, design and scale of
the proposal are all commensurate with the surrounding area which is
mixed in terms of age, design, materials and size. The applicant has
also demonstrated that the location of the proposed flats would not
give rise to significant amenity compromise to existing adjacent
properties in terms of overshadowing or overlooking. 
The orientation of individual houses and flats is mixed respecting the
site constraints. The palette of materials to be used reflects those
Page 149 of 192

Page 156

Renfrewshire Council Planning and Climate Change Policy Board Page 8 
found in the wider area which will assist in assimilating the
development into its location. The internal layout of the development
aims to reduce traffic speeds and protect road safety to the
satisfaction of Roads Development.
Given the positioning of dwellings within the layout, there would be no
potential for direct overlooking or impact on privacy to neighbouring
dwellings. Although it is acknowledged that there are ground level
differences between the proposed development and existing
dwellings, sufficient separation distances have been demonstrated to
reduce impact. Landscaping buffers and tree retention within the
development would also preclude the possibility for overlooking to an
unacceptable degree for existing residential development surrounding
the site.   
In terms of noise, it is not considered that the development will have
an adverse impact in terms of noise or disturbance. The parking court
for the proposed flats is separated from the dividing boundary to
Torran Drive by a treebelt approximately 10 metres wide that will be
retained and protected. This treebelt will also separate the rear
gardens of the proposed houses to those in Torran Drive and the
orientation and layout of the new Cala development and the proposed
houses within this scheme is also acceptable in this regard. 
Appropriate levels of open space and play provision are incorporated
within the application site boundary, with the established Sandieland
Wood also unaffected by the proposals. The site also benefits from an
acceptable degree of enclosure provided by wooded and landscaped
boundaries which will be retained and protected.  Further landscaping
is also proposed within the development and this will complement
existing landscaping. This can be controlled by planning condition to
ensure it is delivered appropriately. 
With regard to the Community Council’s representation, the applicant
has confirmed that the site analysis (desk based and on site surveys)
have analysed all species in line with statutory regulations. Whilst the
Community Council may be dissatisfied with what has been carried
out it has been done in accordance with required procedures.
Effective management and appropriate timings of works will also be
undertaken in accordance with the recommendations of the Ecological
Assessment and in line with best practice. The applicant is aware of
their responsibilities in this regard and the requirement to adhere to 
legislation that controls these matters. The applicant has confirmed
that further surveys on wildlife shall be undertaken at the appropriate
times prior to any development taking place on site to ensure
compliance with the relevant legislation. Best practice is to be followed
to protect wildlife as well as the trees around the site and those within
Sandieland Wood. It is also noted that the proposed landscaping
scheme also requires additional trees to be planted and appropriate
planning conditions are attached to control these matters.
Policy I3, and the Flooding and Drainage guidance within the
Supplementary Guidance, set out a series of criteria which require to
be considered. These generally require minimum standards to reduce
Page 150 of 192

Page 157

Renfrewshire Council Planning and Climate Change Policy Board Page 9 
the risk of flooding in new developments and to ensure that the risk of
flooding is fully considered in the assessment of new development
proposals. The applicants have through the submission of a Drainage
Report and Flood Risk Assessment demonstrated that the buildings
and persons occupying the developed site would not be put at risk
from flooding.   
In terms of the Supplementary Guidance on infrastructure design, the
proposals are considered to demonstrate an acceptable layout. The
applicant has sought to address matters raised by Roads
Development and subject to the attached conditions the proposed
development is considered to be acceptable in terms of impact on the
local road network, sustainable transport, visitor parking and traffic
management. Furthermore, Roads Development has agreed that the
additional off street parking requirements necessary for some of the
larger house types can be met through the removal of permitted
development rights for the associated double width garages provided
for these house plots.
The availability of services was considered when the site was
identified for release through the LDP process. 
As the site has the potential to be of archaeological significance, it has
been recommended by the West of Scotland Archaeology Service,
that a programme of archaeological works be undertaken prior to the
commencement of any development works on site, should consent be
issued. This can be ensured through the imposition of a safeguarding
planning condition on any grant of planning permission. 
The applicant’s submission also adequately demonstrates compliance
with Policy I5 in relation to Waste Management and Policy I7 relating
to Zero and Low Carbon Buildings through the development layout
provided and design of the proposed dwellinghouses. 
With regard to the comments of Children’s Services and the relevant
Policy and guidance on developer’s contributions, the developer
would require to make a financial contribution to ensure adequate
education provision can be made to serve the increased numbers of
pupils generated by these proposals. The applicant is aware of the
sum required and has agreed to enter into a Section 75 agreement to
ensure this sum is provided should consent be granted. 
Recommendation 
In light of the foregoing, it is considered that the proposals are
acceptable and represent acceptable development, having regard to
the relevant development plan policies and associated guidance. It is
therefore recommended that planning permission be granted subject
to conditions and a Section 75 Legal Agreement. 
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal
agreement and conditions 
Reason for Decision
Page 151 of 192

Page 158

Renfrewshire Council Planning and Climate Change Policy Board Page 10 
The proposal accords with the provisions of the Development Plan and there are
no material considerations which outweigh the presumption in favour of
development according with the Development Plan. 
Conditions 
1. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil,
water and gas contamination within the site); and, if remedial works are
recommended therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the
site investigation report prepared in accordance with current authoritative
technical guidance, has been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use 
2. Prior to occupation of any unit within an identified phase of development, the
developer shall submit for the written approval of the Planning Authority: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported soils are suitable for use on the site
shall be submitted to the Planning Authority and approved in writing 
Reason: To demonstrate that the works necessary to make the site suitable for use
have been completed. 
3. Prior to occupation of the final residential unit, hereby approved, the developer
shall complete for use, the provision of a play area, in accordance with the detail
hereby approved. Maintenance of the play area hereby approved, shall be in
accordance with a scheme to be agreed between the developer and the individual
occupiers of the development or a factor appointed to act on their behalf. 
Reason: In the interests of residential amenity. 
4. Development shall not commence until a Bird Hazard Management Plan has
been submitted to and approved in writing by the Planning Authority in consultation
with Glasgow Airport. The submitted plan shall include details of a management of
any flat/shallow pitched/green roofs on buildings within the site which may be
attractive to nesting, roosting and “loafing” birds. The management plan shall
comply with Advice Note 8 ‘Potential Bird Hazards from Building Design’ The Bird
Hazard Management Plan shall be implemented as approved, on completion of the
development and shall remain in force for the life of the development. No
subsequent alterations to the plan are to take place unless first submitted to and
approved in writing by the Planning Authority in consultation with Glasgow Airport. 
Reason: It is necessary to manage the development in order to minimise its
attractiveness to birds which could endanger the safe movement of aircraft and the
Page 152 of 192

Page 159

Renfrewshire Council Planning and Climate Change Policy Board Page 11 
operation of Glasgow Airport. 
5.Prior to occupation of any particular dwellinghouse/flat hereby approved, any
fence or wall to be erected in association with that feu shall be erected in
accordance with the details approved. 
Reason:  In the interests of visual and residential amenity.   
6. That all landscaping works and open space provision shall be completed in
accordance with the approved landscape drawings prior to the occupation of the
last house in the approved development. The open space/landscaped area shall be
retained as open space and to the approved standard. 
Reason: To ensure landscaping works are completed at an appropriate stage in
the development of the site. 
7. That before any works start on site, details of the future management and
aftercare of the proposed landscaping and planting shall be submitted for approval
in writing by this Planning Authority. Thereafter the management and aftercare of
the landscaping and planting shall be carried out in accordance with these
approved details. 
Reason: In the interests of visual amenity; to ensure that adequate measures are
put in place to protect the landscaping and planting in the long term. 
8. That no development shall take place within the development site as outlined in
red on the approved location plan, until the developer has secured the
implementation of a programme of archaeological works in accordance with a
written scheme of investigation which has been submitted by the applicant and
approved in writing by the Planning Authority. Thereafter, the developer shall
ensure that the programme of archaeological works is fully implemented and that
all recording and recovery of archaeological resources within the development site
is undertaken to the satisfaction of the Planning Authority. 
Reason: In order to quantify the effect of the development on the historic
environment, and to allow a methodology to be developed to mitigate this impact,
should this prove necessary. 
9. Two parking spaces shall be provided for 3 bedroom dwellinghouses and three
parking spaces for 4 or more bedroom dwellinghouses to the satisfaction of the
Council as Planning Authority. For the avoidance of doubt permitted development
rights for the conversion of any double garages to another use is removed. 
Reason: To ensure sufficient parking is retained within the site. 
10. That the occupants of each dwellinghouse/flat hereby approved, shall be
provided with a travel information pack which incorporates sustainable travel
information, including the location of local services and facilities upon occupation.
Reason: In the interests of sustainable development.  
11. Prior to the commencement of any construction works on site, the developer
shall submit for the written approval of the Planning Authority a dilapidation survey
of Florish Road from Newshot Drive, and make repairs should it be found the
Page 153 of 192

Page 160

Renfrewshire Council Planning and Climate Change Policy Board Page 12 
impact of construction traffic has deteriorated the public road during the
construction phase prior to occupation of the last unit hereby approved. 
Reason: In the interests of traffic and pedestrian safety. 
12. Visitor parking shall be provided at a rate of 1 per 4 homes evenly distributed
within sight of each property within the development. This parking provision shall
also be in accordance with the national guidelines. 
Reason: In the interests of traffic and pedestrian safety. 
13.Prior to the commencement of any construction works on site, the developer
shall submit for the written approval of the Planning Authority, a construction traffic
management plan ensuring the construction phase of the development will have no
impact on local road network. 
Reason: In the interests of traffic and pedestrian safety. 
14. That before any works start on site, the developer shall submit, details and
specifications of the protective measures necessary to safeguard the trees to be
retained and those which form part of Sandieland Wood, during construction.  The
Planning Authority shall be formally notified in writing of the completion of such
measures and no work on site shall commence until the Planning Authority has
confirmed in writing that the measures as implemented are acceptable.  The
protective measures shall be retained in a sound and upright condition throughout
the operations and no building materials, soil or machinery shall be stored in or
adjacent to the protected area, including the operation of machinery. 
Reason: In order to ensure that no damage is caused to the existing trees during
development operations.
15. That notwithstanding the terms of condition 14 above all trees at the boundary
with the site and within the boundary of the site which are to be retained shall be
protected in accordance with BS 5837: 2012 Trees in Relation to Design,
Demolition and Construction and BS 3998: 2010 Recommendations for Tree Work. 
Reason: To ensure appropriate protection of these specimens. 
16. That before development starts, full details of the facing materials to be used on
all external walls and roofs shall be submitted to, and approved by, the Planning
Authority.  Thereafter only the approved materials shall be used in the development
of the site.  
Reason:  These details have not been submitted. 
17. That prior to the commencement of development an Electric Vehicle Charging
Plan for the development will be submitted for the written approval of the Council
as Planning Authority. Thereafter the plan shall be implemented in accordance with
the approved arrangements to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of sustainable development. 
18. That mitigation will be carried out in accordance with the Barton Wilmore
Ecological Assessment Report (March 2022) to the satisfaction of the Council as
Page 154 of 192

Page 161

Renfrewshire Council Planning and Climate Change Policy Board Page 13 
Planning Authority. 
Reason: In the interests of ecology. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.         
Page 155 of 192

Page 162

Page 156 of 192

Page 163

Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.    22/0236/PP 
KEY  INFORMATION 
Ward: (5)   
Paisley East and
Central 
Applicant:
T100 Ltd. 
Registered: 
19 April 2022 
RECOMMENDATION 
Grant subject to
conditions. 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of self contained
student accommodation with associated facilities, including
demolition. 
LOCATION: 57 High Street, Paisley, PA1 2AN 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The proposal accords with the Adopted Renfrewshire Local
Development Plan (2021) and the New Development
Supplementary Guidance (2022) as well as Historic
Environment Scotland’s Policy Statement.
• Two representations have been received. 
• No objections have been received from any consultees.   
Alasdair Morrison
Head of Economy &
Development
Item 11(d)
PACC230822 Page 157 of 192

Page 164

Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0236/PP 
SITE ADDRESS  57 High Street, Paisley, PA1 2AN
PROPOSAL  Erection of self contained student accommodation with associated
facilities including demolition.
RECOMMENDATION Grant subject to conditions. 
PROPOSALS This application seeks planning permission for the erection of self
contained student accommodation with associated facilities, including
demolition at 55-57 High Street, Paisley. 
The proposed development would comprise of the demolition of the
existing building “Leisure Land” and the erection of development that
would comprise of 150 student studios ranging between 17-22sqm.
The development would be 6 - 7 storeys high and would have a
frontage on High Street and Storie Street. The building would be
approx. 36m high and would incorporate a flat roof design. There
would be a mixed palette of materials which includes aluminium
panels, brickwork masonry with single ply to mansard roofs. The stair
cores would comprise of aluminium composite panels printed with
paisley pattern design. 
The upper 2 levels have been stepped in approx. 2m and 2.75m from
the eastern elevation with a change in materials from the brickwork
masonry to aluminium panels to break up the High Street elevation.
The corner of Storie Street and High Street would have a curved
corten affect façade. 
Access to the building would be obtained via High Street on the
ground floor level. There would also be a secure bike store for 36
bicycles and an off-street secure bin store. The ground floor would
also accommodate a social space with a shopfront façade which
would have glazing to High Street and the Storie Street corner. There
would also be a reception area and a gym. 
The application site is located on the corner of High Street and Storie
Street and is adjacent to the University of West of Scotland (UWS)
Student Union Building and the UWS Campus to the south. Paisley
Museum is also located to the north west of the site. The application
site incorporates Leisure Land at no. 57 High Street and a gap site at
55 High Street which contains self seeded trees. The site area is
approx. 693sqm and is relatively flat along High Street to the north
and is at a steeper incline along Storie street to the west. The area is
characterised by a mix of commercial and residential properties. 
SITE HISTORY An application for conservation area consent (22/0240/CA) in
association with the current planning application has also been
submitted and has have been put forward to today’s Board for
consideration. 
CONSULTATIONS Chief Executive’s Service (Roads Development) – No objections
Page 158 of 192

Page 165

Planning and Climate Change Policy Board Page 3 
subject to conditions. 
Communities and Housing Services (Environmental Protection
Team) – No objections subject to conditions. Concerns have been
raised following the submission of a Noise Impact Assessment with
regards to noise levels affecting the development when windows are
open, particularly with studios that have south facing elevations and
the impact of existing plant. 
Glasgow Airport Safeguarding – No objections subject to
conditions. 
NATS – No objections. 
Scottish Water- No objections. 
West of Scotland Archaeology Service (WOSAS) - No objections
subject to conditions. 
REPRESENTATIONS  One representation has been received where concerns were raised
regarding the following:   
• massing of the development, design and overdevelopment,
• negative visual impact on conservation area,
• loss of daylight and overshadowing, 
• loss of privacy, 
• small social space and green space,
• questions over whether students would also reside in the
accommodation previously approved for the student
accommodation at the TA Hall (20/0217/PP),
• loss of trees 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021)
Policy C1 - Renfrewshire's Network of Centres
Policy ENV3 - Built and Cultural Heritage
Policy I1 - Connecting Places
Policy I3 - Flooding and Drainage
Policy I5 - Waste Management 
Policy I7 - Zero & Low Carbon Buildings 
Policy I8 – Developer Contributions 
New Development Supplementary Guidance (2022)
Delivering the Centres Strategy: Strategic Centres 
Delivering the Environment Strategy: Built and Cultural Heritage
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; Flooding and Drainage;
Zero and Low Carbon Buildings; and Developer Contributions
Delivering the Environment Strategy: Noise and Contaminated Land 
Material Considerations 
Historic Environment Scotland's Historic Environment Policy for
Scotland (HEPS) 2019 and associated "Managing Change in the
Historic Environment" guidance notes.
Page 159 of 192

Page 166

Planning and Climate Change Policy Board Page 4 
PLANNING
ASSESSMENT
The application site is identified in the Adopted Renfrewshire Local
Development Plan (2021) as part of Renfrewshire’s network of
centres.
Policy C1 - Renfrewshire's Network of Centres states that each of
the centres in Renfrewshire form part of a diverse, interconnected
network of places to live, shop, work, enjoy entertainment, leisure and
cultural activities.  
The Policy also states that the Council welcomes development that
will strengthen the network and enhance its centres, ensuring they are
places which are vibrant, inclusive, accessible and complementary, as
well as compatible with surrounding land uses.  
The New Development Supplementary Guidance also states that the
proposed uses should not undermine the principal function of the
centre and is complementary to existing uses and activities and that
the scale, design and layout should also contribute towards and
compliment the surrounding area.
The town centre is recognised as being a hub for a mix of uses, and
the proposed student accommodation will contribute positively to this
mix. 
The development will contribute to the viability of Paisley Town Centre
by redeveloping a vacant building and gap site that occupy a visually
prominent location withing the conservation area. 
The proposed use will also generate additional residence and footfall
within the town centre, contributing positively to economic viability. 
Increasing the number of students living in the town centre is a key
objective for the High Street and University area as defined in the
Paisley Town Centre Action Plan, and it is recognised that increasing
the resident population within the town centre plays a vital role in
supporting the day and night time economy.
It is considered that the proposal would be a positive addition, creating
a high quality place which would enhance the built and cultural
heritage of the Centre. 
Policy ENV3 - Built and Cultural Heritage and Historic Environment
Scotland's guidance both state that the built heritage which includes,
listed buildings and conservation areas should be safeguarded and
enhanced, where appropriate. 
The New Development Supplementary Guidance also states that high
standards of design should be employed which have regard to the
Page 160 of 192

Page 167

Planning and Climate Change Policy Board Page 5 
architecture and character of the area and ensure the maintenance
and enhancement of local distinctiveness.
Historic Environment Scotland were consulted on the application for
conservation area consent (22/0240/CA) in association with the
current planning application and advise that the existing buildings
which would be demolished, do not make a positive contribution to the
conservation area and that designs for the replacement building
should seek to preserve and enhance the character of the
conservation area.
It is considered that careful consideration has been given to the
design of the building, including the height, given its prominent
location. As detailed above, the upper floors at the east of the building
have been stepped in with a change in materials to break up this
elevation to create a gap between the neighbouring building at no. 53
High Street which sits at a much lower height. A feature corner would
also be created at the Storie Street corner with a shop like frontage at
groundfloor level. The Storie Street corner would also incorporate a
similar curved edge to the sandstone traditional property at 59 High
Street and would also sit slightly lower in height. It is considered that
the proposed development would have a positive impact on the
character and appearance of High Street.  Existing and proposed
visuals from the south end of Storie Street have also been provided
which demonstrate that the visual impact from this aspect would also
be acceptable. It is not considered that visuals from other areas would
be necessary given that the building would not be readily visible from
New Street and the north elevation adequately demonstrates the
visual impact from Orr Street.
In view of the above, it is considered that the scale, massing and
materials would have a positive impact on the surrounding built
heritage.
Policy I1 ‘Connecting Places’ – This policy recognises that
increased access and connectivity to walking, cycling and public
transport networks is a key consideration for investment locations
within Renfrewshire.
The site is within a sustainable location, and is highly accessible with
respect to walking, cycling and public transport routes. The wide
range of amenities within the town centre are all within walking
distance of the site.
The proposals satisfy the policy objective of appropriate provision
being made to connect to active travel as well as allowing for walking,
cycling and public transport being considered from the outset. The
development would provide secure bike stands. Given the
Page 161 of 192

Page 168

Planning and Climate Change Policy Board Page 6 
development is for student accommodation and is within a town centre
location, vehicular parking at the site is not proposed which is
considered to be consistent with Government sustainable policies
given the accessibility of the location. 
Policy I3 ‘Flooding and Drainage’ – The proposal does not increase
the risk of flooding. A condition with respect to a Drainage Impact
Assessments and SUDs could also be imposed.
Policy I5 - Waste Management – It is proposed to provide enclosed
secure bin storage. At present, there are bins on the footpath adjacent
to the gap site at no. 55 High Street which are rented by local
businesses. The applicant has written to the businesses to inform
them of the planning application and to offer room for the bins within
the secure bin shelter. This would improve the visual amenity of the
area by removing bins from the footpath.
Pre-application discussions were also undertaken with the Council’s
Waste Operations with regards to the proposed bin storage
arrangements and no objections were raised. A planning condition
has been attached to control this matter.
Policy I7 - Zero & Low Carbon Buildings - seeks to encourage
energy efficiency in new buildings, and the installation of technology
that produces low or no amounts of carbon dioxide emissions. 
The applicants have submitted a statement which states that the
development would be built to exceed the current building regulation
requirements for new buildings. A number of efficiency measures will
be employed in the design and operation of the development in order
to minimise the ongoing carbon footprint of the building.  At detailed
design stage an SBEM calculation can be provided in order to
demonstrate performance. These measures will ensure the
development accords with Policy I7.
Policy I8 – Developer Contributions states that contributions will be
sought for the items such as education, health care, traffic
management etc. to address infrastructure deficits and/or a shortfall in
infrastructure capacity that arise as a direct result of new
development. Any contribution sought will be appropriate,
proportionate, necessary and relevant to the nature of the
development, its scale and its location.
In this regard, it is not considered that the development would result in
infrastructure deficits that would require contributions.
Representations
Page 162 of 192

Page 169

Planning and Climate Change Policy Board Page 7 
With regards to the concerns raised in representations: - 
• Massing of the development, design and overdevelopment,
Although the development has a total of 7 floors, the top floor has a
mansard roof with dormer windows which are set back from the
elevation such that it would have the appearance as having 6 floors
from Storie Street. As detailed above, it is considered that careful
consideration has been given to the design of the building, including
the height and material given its prominent location in the Town
Centre Conservation Area. It is not considered that the development
amounts to overdevelopment of the site.
• Negative visual impact on conservation area,
For the reasons detailed above, it is not considered that the proposal
would have a detrimental impact on the character or appearance of
the Town Centre Conservation Area
• Loss of daylight and overshadowing, 
The development has been designed such that the parapet of 5th floor
is similar to the height of the parapet of the adjacent property at 20
Storie Street. The floor to floor height of the apartments have also
been reduced in height from 3.2m to 2.8m which would reduce the
height of the originally proposed building by approx. 1.2m. The
parapet at the 4th floor has also been reduced by 800mm. Whilst it is
noted that there will be shadowing and loss of sunlight to properties at
no. 59 High Street, it is considered that due to higher density
development, buildings within a town centre location may be more
susceptible to overshadowing. It is considered that the proposal has
been designed to take shadowing and daylight into consideration. 
• Loss of privacy, 
The internal area of the apartments have been designed such that any
glazing elements would be restricted to kitchen or desk worktops. The
applicant has also confirmed that net curtain fabric would be fitted for
increased privacy during daytime and blackout blinds during night time
hours. Notwithstanding this, it is considered that in a town centre
environment there may be a loss of a degree of privacy due to higher
density development. 
• Small social space, loss of green space and trees,
It is considered that the level of social space is acceptable, particularly
as this is a town centre higher density development. It is also
considered that the gap site at no. 55 is overgrown and the self
seeded trees do not positively contribute to the conservation area. It is
Page 163 of 192

Page 170

Planning and Climate Change Policy Board Page 8 
considered that the development of this site as part of the
development would be a welcome improvement and would ensure
that the site is utilised by a viable use all to the benefit of the vitality of
the town centre.
• Questions over whether students would also reside in the
accommodation previously approved for the student accommodation
at the TA Hall (Ref:20/0217/PP),
This is not a material planning consideration and would be a matter for
the applicant to consider.
Consultee Comments
With regards to the concerns raised by the Council’s Communities
and Housing Services (Environmental Protection Team) with respect
to noise levels affecting the development with windows open, whilst it
is noted that this is not ideal, this would mainly be attributed to south
facing units which may be impacted by existing plant. Acceptable
standards can be achieved with windows closed and given the town
centre location and that the development does not relate to permanent
residential dwellings, it can be accepted in this instance subject to the
imposition of the attached planning conditions.
Conclusion
It is considered that the proposal would provide a development which
would significantly improve the vitality and viability of the Town Centre
whilst also enhancing and protecting the built heritage of the
surrounding area. The development would be complimentary to
surrounding uses and would also comprise of the redevelopment of a
prominent vacant site all to the benefit of the Town Centre
Conservation Area.
RECOMMENDATION Grant subject to conditions. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. That prior to the commencement of the development hereby approved, full
details and/or samples of the facing materials to be used on all external
walls and roofs shall be submitted to, and approved in writing by,
Renfrewshire Council as Planning Authority.  Thereafter only the approved
materials shall be used in the development of the site.   
Page 164 of 192

Page 171

Planning and Climate Change Policy Board Page 9 
Reason:  In the interests of visual amenity. 
2. That prior to the commencement of the development hereby approved, a
comprehensive transitionary land use plan, including detailed timescales,
showing precisely what will be happening on all areas of the site during the
various stages of the redevelopment process. This will include details of:
the demolition process, the various construction phases and the extent and
location of the construction compounds required to deliver development on
all parts of the site. 
Reason: To safeguard the character and appearance of the conservation       
area during the demolition and construction process. 
3. No development shall commence on site until written approval of: 
(a) a Site Investigation report (characterising the nature and extent of any
soil, water and gas contamination within the site); and, if remedial works are
recommended therein 
(b) a Remediation Strategy and Implementation Plan identifying the
proposed methods for implementing all remedial recommendations
contained within the site investigation report 
all prepared in accordance with current authoritative technical guidance,
have been submitted to and approved in writing by Renfrewshire Council as
Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
4. That prior to the occupation of any unit on the site: 
(a) a Verification Report confirming completion of the works specified within
the approved Remediation Strategy and Implementation Plan; or 
(b) where remediation works are not required but soils are to be imported to
site, a Verification Report confirming imported materials are suitable for use 
shall be submitted to and approved in writing by Renfrewshire Council as
Planning Authority. Verification Reports shall not be submitted on a phased
basis unless first agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for
use have been completed. 
5. That prior to the commencement of the development hereby approved, the
developer shall secure the implementation of archaeological works in
accordance with a written scheme of investigation which has been
submitted by the applicant and approved by the Planning Authority. 
Thereafter, the developer shall ensure that the programme of
archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority. 
Page 165 of 192

Page 172

Planning and Climate Change Policy Board Page 10 
Reason: To ensure that any archaeological remains which may be
disturbed can be identified, excavated and recorded. 
6. That prior to commencement of above ground works a Bird Hazard
Management Plan shall be submitted to, and approved in writing by, the
Planning Authority in consultation with Glasgow Airport. For the avoidance
of doubt, the submitted plan shall include details of: 
• Management of and flat/shallow pitched green roofs on buildings
within the site which may be attractive to nesting, roosting and
“loafing” birds. The management plan shall comply with Advise Note
8 ‘Potential Bird Hazards from Building Design.’ 
The Bird Hazard Management Plan shall be implemented as approved on
completion of the development, and shall remain in force for the life of the
development. No subsequent alterations to the plan are to take place
unless first submitted to and approved in witing by Renfrewshire Council as
Planning Authority in consultation with Glasgow Airport. 
Reason: It is necessary to manage the development in order to minimise its
attractiveness to birds which could endanger the safe movement of aircraft
and the operations of Glasgow Airport. 
7. That prior the commencement of the development hereby approved, the
applicant shall submit for the written approval of Renfrewshire Council as
Planning Authority, details of a designated drop off and pick up area. For
the avoidance of doubt, this should include the exact location and design of
the pick up area. 
Reason: This information has not been provided. 
8. That prior to the commencement of the development hereby approved, the
applicant shall submit for the written approval of Renfrewshire Council as
Planning Authority, a Construction Traffic Management Plan. For the
avoidance of doubt, this plan shall demonstrate how, during demolition and
build phase, there will be no detrimental impact on pedestrian/cyclist/public
transport and the local road network. 
Reason: This information has not been provided. 
9. That prior to the commencement of the development hereby approved, a
Drainage Impact Assessment shall be submitted and approved by
Renfrewshire Council as Planning Authority. The Drainage Impact
Assessment shall accord with the ‘Council’s Drainage Assessment – Notes
for Guidance’. 
Reason: To ensure adequate provision for drainage associated with the
development. 
10. That prior to the commencement of the development hereby approved,
confirmation shall be submitted in writing to Renfrewshire Council as
Planning Authority and certified by a suitable qualified person that a
scheme to treat the surface water arising from the site has been prepared in
Page 166 of 192

Page 173

Planning and Climate Change Policy Board Page 11 
accordance with the principles and practices contained in “The SuDS
Manual” (CIRIA report C753, published in November 2015).  Thereafter, the
certified scheme shall be implemented prior to the completion of the
development and maintained thereafter to the satisfaction of Renfrewshire
Council as Planning Authority. 
Reason:  In the interests of securing a suitable SuDs scheme for the
treatment of surface water runoff 
11. The design, installation and operation of any plant, machinery or equipment
proposed as part of the development itself shall be such that noise
associated with the development does not exceed Noise Rating Curve
NR25 between the hours of 2300 to 0700 hours and NR 35 at all other
times, when measured within any dwelling in the vicinity of the
development. Structure borne vibration from the proposed development
shall be imperceptible within any dwelling in the vicinity of the development. 
For an explanation of noise rating curves, refer to BS 8233:2014 Sound
insulation and noise reduction in buildings- code of practice, Annex B. 
Reason: In the interests of residential amenity. 
12. Notwithstanding the consent hereby given, the developer shall ensure the
mitigation measures contained in Chapter 6 of the Airshed Report titled
Environmental Noise Assessment for Proposed Residential Student
Accommodation, High Street, Paisley, Renfrewshire (report no. AS 0925
dated 20th July 2022) shall be implemented and complied with during
construction and for the lifetime of the development to the satisfaction of the
Council as Planning Authority. These include the following: 
Road traffic noise 
• Provide acoustic insulation in the form of double-glazing and
mechanical ventilation and heat recovery (MVHR) on all units where
the free-field external noise level at exposed facades is predicted to
exceed 50 dB LAeq 07:00 – 23:00 or 45 dB LAeq 23:00 – 07:00
(74% of all units). The units requiring this additional mitigation are
listed in Table 6.1 of the report and shown in bold red text. 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with BS 8233: 2014 Table 4 noise criteria in habitable rooms.   
Fixed plant noise 
The combined noise from existing and proposed fixed plant will not exceed
Noise Rating Curve 25 (NR25) within all habitable rooms: 
• Where a mechanical ventilation and heat recovery (MVHR) scheme
is required to achieve this these units will have enhanced double-
glazing. 
Page 167 of 192

Page 174

Planning and Climate Change Policy Board Page 12 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with NR25 with closed windows and MVHR where appropriate; 
• Prior to occupation of any units, a further assessment of noise from
the proposed fixed plant associated with the developments
heating/ventilation/air conditioning (HVAC) scheme must be
undertaken and submitted for written approval to ensure that noise
levels inside existing and proposed habitable rooms will not exceed
NR25 at night. 
Public house noise 
The noise from music breakout and patrons will not exceed NR15 within all
habitable rooms: 
• Where windows require to be closed a mechanical ventilation and
heat recovery (MVHR) scheme shall be provided. 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with NR15 with closed windows and MVHR where appropriate. 
No property within the development shall be occupied until all approved
mitigation measures have been completed in full. 
Reason: In the interests of residential amenity. 
13. That prior to the commencement of development a Waste Management
Plan will be submitted for the written approval of the Council as Planning
Authority. For the avoidance of doubt this shall allow for access and use of
the development’s bin storage area by other nearby properties/businesses.
Thereafter the plan shall be implemented in accordance with the approved
arrangements to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of amenity and to control waste. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.       
Page 168 of 192

Page 175

Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.    22/0240/CA 
KEY  INFORMATION
Ward: (5)   
Paisley East and
Central 
Applicant:
T100 Ltd. 
Registered: 
19 April 2022 
RECOMMENDATION 
Grant subject to
conditions. 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Demolition in association with
the erection of student accommodation block. 
LOCATION: 57 High Street, Paisley, PA1 2AN 
APPLICATION FOR: Conservation Area Consent 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is within the Paisley Town Centre
Conservation Area and is identified by Policy ENV3 – Built
Heritage within the Adopted Renfrewshire Local Development
Plan (2021). 
• No representations have been received. 
• Historic Environment Scotland have no objections to the
demolition. 
• The proposal accords with the relevant provisions of the
Adopted Renfrewshire Local Development Plan (2021) and the
New Development Supplementary Guidance as well as
Historic Environment Scotland’s Policy Statement. 
Alasdair Morrison
Head of Economy &
Development
Item 11(e)
PACC230822 Page 169 of 192

Page 176

Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0240/CA 
SITE ADDRESS  57 High Street, Paisley, PA1 2AN
PROPOSAL  Demolition in association with the erection of student accommodation
block.
RECOMMENDATION Grant subject to conditions. 
PROPOSALS This application seeks conservation area consent in association with
the erection of self contained student accommodation at 55-57 High
Street, Paisley.
The proposed development would comprise of the demolition of the
existing building “Leisure Land” and the erection of the development
that would comprise of 150 student studios. The development would
be 6 - 7 storeys high and would have a frontage on High Street and
Storie Street.
The building to be demolished is an unlisted mid-twentieth century
brick built building with a flat roof which fronts High Street with a single
storey façade which extends to 3 storeys to the rear of the site at
Storie Street. 
SITE HISTORY An application for planning permission (22/0236/PP) in association
with the current conservation area application has also been
submitted and has been put forward to today’s Board for
consideration. 
CONSULTATIONS Historic Environment Scotland (HES) - advise that the existing
buildings which would be demolished, do not make a positive
contribution to the conservation area and that designs for the
replacement building should seek to preserve and enhance the
character of the conservation area. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021)
Policy ENV3 – Built and Cultural Heritage 
New Development Supplementary Guidance 2022
Delivering the Environment Strategy: Built and Cultural Heritage 
Material considerations
Historic Environment Scotland's Historic Environment Policy for
Scotland (HEPS) 2019 and associated "Managing Change in the
Historic Environment" guidance notes. 
PLANNING
ASSESSMENT
In considering the demolition of unlisted buildings in conservation
areas, Historic Environment Scotland's guidance advises that
planning authorities should take into account the contribution that the
building makes to the character, appearance and history of the
relevant conservation area. There is a presumption in favour of the
retention of unlisted buildings in conservation areas where they make
Page 170 of 192

Page 177

Planning and Climate Change Policy Board Page 3 
a positive contribution to the character of the area.
Historic Environment Scotland were consulted and advise that the
buildings that would be demolished do not make a positive
contribution to the conservation area and are content with their
removal.
The design of the replacement building will be assessed through the
planning application Ref: 22/0236/PP.
Conclusion
In light of the above assessment, it is considered that the proposal
accords with the relevant policies and guidance of the Council in
respect of the Adopted Local Development Plan, the New
Development Supplementary Guidance and the Historic Environment
Scotland Policy Statement and guidance. 
It is therefore recommended that conservation area consent be
granted. 
RECOMMENDATION Grant subject to conditions. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. That no demolition shall take place until it has been demonstrated to the
written satisfaction of Renfrewshire Council as planning authority, that
signed and binding contracts are in place to secure the redevelopment of
the site immediately following demolition, and in a manner consistent with
that set out in any planning permission as may be approved for the
redevelopment of the site.  Thereafter, the redevelopment of the site shall
only proceed in accordance with the terms and conditions set out in this
planning permission. 
Reason:  In the interest of amenity and to ensure that buildings are not
demolished unless approved development is to take place on the cleared
site following its demolition. 
2. That no demolition shall take place until a comprehensive phasing plan has
been submitted to and approved in writing by Renfrewshire Council as
planning authority. The phasing plan shall provide a clear explanation and
illustration of what will be taking place on all parts of the site throughout the
redevelopment. Thereafter, these works as may be approved shall proceed
in accordance unless otherwise agreed in writing by Renfrewshire Council
as Planning Authority. 
Reason: In the interests of preserving the character of the conservation
Page 171 of 192

Page 178

Planning and Climate Change Policy Board Page 4 
area. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other
background papers, please contact Gwen McCracken on 07483419705.           
Page 172 of 192

Page 179

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0248/PP 
KEY  INFORMATION 
Ward: (9)   Johnstone
North, Kilbarchan,
Howwood and
Lochwinnoch 
Applicant:
Mr John Smith 
Registered: 
06.04.2022 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Formation of outdoor
terrace to side of public house 
LOCATION: 1 George Street, Howwood 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P1 ‘Renfrewshire’s
Places’ of the Adopted Renfrewshire Local Development
Plan (2021). 
• Seven representations have been received from six parties
which relate to noise, road safety, loss of privacy and
residential amenity. 
• There have been no objections from consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the Local Development
Plan.     
Alasdair Morrison
Head of Economy &
Development
Item 11(f)
PACC230822 Page 173 of 192

Page 180

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0248/PP 
SITE ADDRESS  1 George Street, Howwood
PROPOSAL  Formation of outdoor terrace to side of public house
RECOMMENDATION Granted subject to conditions 
PROPOSALS This application seeks consent for the formation of an outdoor terrace
to side of a public house located on George Street, Howwood.  The
site fronts the road to the north west and is bound by a convenience
store to the north east and residential properties to the south east and
south west. 
The proposed outdoor terrace is positioned to the side of the building
and extends 2.97 metres from the side elevation and measures 9.1
metres in length.  The terrace includes a stained timber fence to the
side and a white painted rendered low wall to the front with an inward
opening hinged timber gate. 
The initial proposal has been altered following sightline concerns from
Roads Development regarding the proposed timber fence to the side
of the terrace.  Revised drawings have been submitted to mitigate the
concerns with the fence and the front wall lowered to 1.05 metres in
height. 
SITE HISTORY Application No: 22/0818/PP
Description: Alterations to frontage and single storey extension to side
elevation
Decision: Granted 
CONSULTATIONS Chief Executive’s Service (Roads Development) – No objections. 
Communities & Housing Services (Environmental Protection Team) –
No objections subject to a condition restricting the hours of use to
prior to 9pm. 
REPRESENTATIONS  7 objections were received from 6 parties with the following concerns: 
1. Noise 
Response - addressed within main body of assessment. 
2. Road safety
Response - addressed within main body of assessment. 
3. Reduction of residential amenity 
Response - addressed within main body of assessment. 
4. Loss of privacy 
Response - addressed within main body of assessment.
Page 174 of 192

Page 181

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3 
5. Odour from cigarette smoke
Response – Not a material consideration that can be taken into
account during the assessment. 
6. Impact on mortgage applications
Response – Not a material consideration that can be taken into
account during the assessment. 
DEVELOPMENT PLAN
POLICIES
Renfrewshire Local Development Plan (2021)
Policy P1: Renfrewshire's Places 
New Development Supplementary Guidance (2021)
Delivering the Places Strategy 
Material considerations
Planning legislation requires that planning decisions are made in
accordance with the Development Plan unless material considerations
indicate otherwise. In this case the proposal shall require to be
assessed against the policies and guidance set out above, the history
of the site, the comments of the consultees and any objections
received. 
PLANNING
ASSESSMENT
The site is located within an area that is covered by Policy P1 of the
Renfrewshire Local Development Plan. Policy P1 states that new
developments should be compatible and complementary to existing
uses and demonstrate that they would cause no significant harm to
these uses. 
The outdoor terrace is positioned to the side of the premises. In terms
of visual amenity, the design of the outdoor terrace does not raise any
issues. The development is subordinate to the premises and is
considered acceptable in terms of scale and siting. Communities &
Housing Services (Environmental Protection Team) have been
consulted and have requested that a condition be applied to restrict
the use of the beer garden to prior to 9pm. The condition is
considered appropriate to ensure the development would not impact
on the residential amenity of nearby properties. 
The proposed development does not raise any concerns in terms of
privacy or overlooking due to the screening provided by the proposed
fence to the side of the terrace.
In terms of road safety, Roads Development have been consulted and
have no objections to the proposed development. 
In view of the above, the proposed development is considered to be
acceptable. 
RECOMMENDATION Grant subject to conditions. 
Page 175 of 192

Page 182

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. That the outdoor terrace shall not be in use after 21:00 hours. 
Reason:  In the interest of residential amenity. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.       
Page 176 of 192

Page 183

Renfrewshire Council Planning and Climate Change Policy Board 
Page 1
Planning Application: Report of Handling 
Reference No.    22/0329/PP 
KEY  INFORMATION
Ward: (2) Renfrew
South and Gallowhill   
Applicant: Beijing
Banquet 
Registered: 
14 June 2022 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of single storey
extension to rear and installation of rooflight in retrospect 
LOCATION: Beijing Banquet, 200 Arkleston Road, Renfrew 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P1 ‘Renfrewshire’s
Places’ of the Adopted Renfrewshire Local Development
Plan (2021). 
• Four representations have been received which relate to loss
of privacy, amenity and daylight; noise, smell and an
increase in waste; and previous unauthorised development. 
• There have been no objections from consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the Local Development
Plans.   
Alasdair Morrison
Head of Economy &
Development
Item 11(g)
PACC230822 Page 177 of 192

Page 184

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0178/PP 
SITE ADDRESS  Beijing Banquet, 200 Arkleston Road, Renfrew
PROPOSAL  Erection of single storey extension to rear and installation of rooflight
in retrospect
RECOMMENDATION Grant subject to conditions 
PROPOSALS Planning permission is sought for the erection of a single storey
extension to the rear and installation of a rooflight (in retrospect) at
Beijing Banquet, 200 Arkleston Road, Renfrew. 
The proposed extension would have an approximate external footprint
of 29sq m with an overall height of 2.6m and would be finished in a
brickwork basecourse, with render above. 
The application site is bound to the north and east by residential
properties, to the south by Arkleston Road and to the west by a petrol
filling station. 
It should also be noted that the current application has been submitted
as an alternative to the unauthorised containers which are presently
sited at this location and are subject to enforcement action. 
SITE HISTORY Application No: 21/1089/PP
Description: Partial change of use of first floor storage area into
managers accommodation
Decision: Granted 
Application No: 22/0050/PP
Description: Siting of refurbished steel containers to rear and
installation of rooflight (in retrospect)
Decision: Withdrawn   
Application No: 01/0852/AD
Description: Display of 1 internally illuminated free standing pole sign;
two externally illuminated fascia signs; two externally illuminated free
standing signs; three externally illuminated wall signs; and one
internally illuminated menu case.
Decision: Granted subject to conditions 
CONSULTATIONS Transport Scotland – No objections. 
Communities & Housing Services (Environmental Protection
Team) – No objections. 
REPRESENTATIONS  Four letters of representation objecting to the proposed development
have been received, the substance of which can be summarised as
follows:- 
1. The unauthorised rooflight impacts on privacy. 
Page 178 of 192

Page 185

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3 
Response – addressed within main body of assessment. 
2. The proposed extension will compromise amenity and affect
daylight. 
Response - addressed within main body of assessment. 
3. Noise already an issue to the rear of the premises and proximity of
extension could exacerbate this. Construction hours in the past have
been at unsociable hours and not in accordance with approved plans
which may happen again.
Response – No objections have been raised in this respect in relation
to the current proposals by Environmental Services as a consultee
which would warrant refusal of the application. 
4. Increasing this facility will increase waste and attract vermin. 
Response – No objections have been raised in this respect in relation
to the current proposals by Environmental Services as a consultee
which would warrant refusal of the application. Should issues arise
this should be reported to Environmental Services directly. 
5. The smell from the premises is unacceptable and an increase in its
scale could make this worse. 
Response – No objections have been raised in this respect in relation
to the current proposals by Environmental Services as a consultee
which would warrant refusal of the application. Should issues arise
this should be reported to Environmental Services directly. 
6. Do not want any further building overlooking properties. 
Response – Noted and addressed within main body of assessment. 
7. An extraction flue is shown on the drawings.
Response – This relates to an existing installation and does not form
part of the current proposals. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan 2021
Policy P1: Renfrewshire's Places 
New Development Supplementary Guidance 2022
Delivering the Places Strategy 
Material considerations
Planning legislation requires that planning decisions are made in
accordance with the Development Plan unless material considerations
indicate otherwise. In this case the proposal shall require to be
assessed against the policies and guidance set out above, the history
of the site, the comments of the consultees and any objections
received. 
PLANNING
ASSESSMENT
The application site is covered by Policy P1 which encourages further
development were that development would not adversely affect
existing development or be adversely affected by existing
development. 
Page 179 of 192

Page 186

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4 
In considering whether the proposals could adversely affect existing
development Alterations and Extensions to Existing Properties of the
Delivering the Places Criteria of the New Development Supplementary
Guidance requires to be considered. 
In this regard, the development would be of an appropriate scale, size
and massing which would not constitute over development particularly
given the discreet location to the rear of the building. 
The design and materials would also be suitably reflective of the main
restaurant building and surrounding residential development,
respecting the character of the surrounding area. 
As the proposals would see a replacement of presently sited
containers for a permanent structure of enhanced build quality, it is
also considered that the amenity of the neighbouring residents would
be enhanced by the proposals. 
In addition to the above, it should be noted that an enforcement notice
was served in relation to the siting of the containers on site and as
such should the application in question be granted, the terms of the
enforcement notice remain in that the containers require to be
removed from site. 
Overall therefore the proposed extension is considered to be
compatible with the surrounding area and commensurate with the
provisions of Policy P1 and the New Development Supplementary
Guidance Delivering the Places Criteria. 
Considering the retrospective rooflight, given the height of the opening
and it’s angled positioning it is not considered that this would have a
significant direct impact on the privacy of neighbours on this occasion
and as such is also considered acceptable on balance. 
Recommendation and reasons for decision    
In light of the above assessment, the proposal is considered to be
acceptable and it is therefore recommend that planning permission be
granted, subject to conditions. 
RECOMMENDATION Grant subject to conditions. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1.That before development starts, full details of the facing materials to be used on
Page 180 of 192

Page 187

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5 
all external walls and roofs shall be submitted to, and approved by, the Planning
Authority.  Thereafter only the approved materials shall be used in the development
of the site.    
Reason:  These details have not been submitted. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.         
Page 181 of 192

Page 188

Page 182 of 192

Page 189

Renfrewshire Council Planning and Climate Change Policy Board 
Page 1
Planning Application: Report of Handling 
Reference No.    22/0345/PP 
KEY  INFORMATION
Ward: (1) Renfrew
North & Braehead 
Applicant:
Bellway Homes Limited
(Scotland West) 
Registered: 
23 May 2022 
RECOMMENDATION 
Disposed to grant
subject to the conclusion
of a Section 75 legal
agreement and
conditions 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising eighty flats and thirty nine
dwellinghouses and formation of roads, infrastructure, open
space amenity. 
LOCATION: Site On Southern Edge Of Roundabout
Junction With Laymoor Avenue, King's Inch Road, Renfrew 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P1 of the
Adopted Renfrewshire Local Development Plan (2021). 
• Eight representations have been received which relate to
access arrangements and additional traffic as a result of
the development; the type of development proposed;
availability of services; displacement of wildlife; attraction
of vermin; and ownership. 
• There have been no objections from consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the Local Development
Plan, utilising a brownfield site for the purpose of
regeneration and provision of affordable homes.   
Alasdair Morrison
Head of Economy &
Development
Item 11(h)
PACC230822 Page 183 of 192

Page 190

Renfrewshire Council Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0345/PP 
SITE ADDRESS  Site On Southern Edge Of Roundabout Junction With Laymoor
Avenue, King's Inch Road, Renfrew
PROPOSAL  Erection of residential development comprising eighty flats and thirty
nine dwellinghouses and formation of roads, infrastructure, open
space amenity
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal
agreement and conditions 
PROPOSALS Planning permission is sought for the erection of thirty nine
dwellinghouses and eighty flats (27% of which are proposed to be
affordable), with associated access, infrastructure and open space at
land on the southern edge of the roundabout junction with Laymoor
Avenue and King's Inch Road, Renfrew. 
The application site extends to approximately 2.59 hectares and is
currently cleared brownfield land. 
The proposals seek to erect a mixture of terraced, semi-detached and
detached dwellings throughout, with flats proposed to the frontage at
King’s Inch Road. The proposed flats would reach a maximum height
of four storeys.   
Pedestrian and cycle linkages are proposed at several locations
throughout the site to existing development and amenity space. 
Vehicular access to the development would be via the existing road
opening on Laymoor Avenue. 
The site is bordered by residential development to the north west,
Howdens factory to the south and Braehead Shopping Centre car
parks to the north east, east and south east. Electrical substations to
serve Braehead are positioned, on the same side of King’s Inch Road
to the proposal and the proposed development takes cognisance of
these in the overall design.   
SITE HISTORY Application No: 22/0098/PP
Description: Change of use of car parking spaces and landscaping to
car wash and valet, siting of portakabin and erection of canopy
Decision: Granted subject to conditions. 
Application No: 22/0356/PP
Description: External alterations including the installation of service
gantry to existing service yard, formation of two doors to east
elevation and removal of existing billboard
Decision: Withdrawn 
CONSULTATIONS Communities & Housing Services - (Environmental Protection
Team) – No objection  subject to conditions.  
Chief Executive’s Service (Roads Development) – No objection
Page 184 of 192

Page 191

Renfrewshire Council Planning and Climate Change Policy Board Page 3 
subject to conditions 
Children’s Services – No objections or contribution required. 
Glasgow Airport Safeguarding - No objection  subject to conditions. 
SEPA – No objections. 
Scottish Water - No objection. 
NATS - No objection. 
REPRESENTATIONS  Eight representations have been received which object to the
proposed development. The issues raised are summarised as follows:
1. Traffic system can’t handle the additional traffic brought by further
housing, resulting in safety issues. Traffic will discourage people from
using the facilities already in place at Braehead. Would encourage an
additional access point onto King’s Inch Road. 
Response – Conditions have been proposed following consideration
by Roads Development of the proposals to ensure compliance with
the relevant policies and guidance. 
2. The location of the site would be better suited for industrial or
commercial development. 
Response: Each application is considered on its own merit as
submitted for suitability. 
3. Council services already stretched, with further housing likely to
cause further impact. 
Response: Noted and consultation comments addressed in this
regard. 
4. Appropriate infrastructure and services require to be in place.
Insufficient GP surgeries, dentists and education and nursery
provision in area for further development of this nature. 
Response: Noted and consultation comments addressed in this
regard. 
5. Renfrew will benefit nothing from further housing at the scale or
type of units proposed. 
Response: Opinion noted. 
6. Building works will cause disturbance to local area. 
Response: Noted, however this would not be a long term impact on
the wider area which would require mitigation measures to be
implemented. 
Page 185 of 192

Page 192

Renfrewshire Council Planning and Climate Change Policy Board Page 4 
7. Loss of green space and displacement of wildlife. 
Response: Noted and regulated via alternative legislation which the
applicant is aware of in order to obtain the relevant licences. 
8. Development likely to see an influx of rats just like the development
further along the road. 
Response: Comments noted and to be addressed by Environmental
Protection should this become an issue. 
9. Renfrew needs more green spaces not houses. 
Response: Each application is considered on its own merits as
submitted for suitability. 
10. Boundary requires to be clarified as existing fencing is in
ownership of another party. 
Response: Applicant has confirmed that they shall not extend
development outwith the land in their ownership in order to deliver the
development. 
DEVELOPMENT PLAN
POLICIES
Renfrewshire Local Development Plan (2021)
Policy P1: Renfrewshire’s Places  
Policy P3: Housing Mix and Affordable Housing 
Policy I1: Connecting Places 
Policy I3: Flooding and Drainage 
Policy I7: Renewable and Low Carbon Energy Developments
Policy I5: Waste Management 
Policy I8: Developer Contributions 
New Development Supplementary Guidance (2022)
Delivering the Places Strategy
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; Renewable and Low
Carbon Energy Developments; Flooding and Drainage; and
Development Contributions 
Delivering the Environment Strategy: Noise and Contaminated Land   
Material considerations
Renfrewshire's Places Residential Design Guide March 2015 
PLANNING
ASSESSMENT
The site is located within an area that is covered by Policy P1 of the
Renfrewshire Local Development Plan. Policy P1 states that new
developments should be compatible and complementary to existing
uses and demonstrate that they would cause no significant harm to
these uses.  Given the neighbouring uses it is considered that the
proposed development is capable of positive consideration against the
terms of Policy P1. 
The principle of the proposal, redeveloping a vacant, previously used
Page 186 of 192

Page 193

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
site within an existing place, would also be in line with the Spatial
Strategy as outlined in the Adopted Renfrewshire Local Development
Plan.  The proposal would result in the development of a brownfield
site. 
Policy P3 – Housing Mix and Affordable Housing, set out in the
Adopted Renfrewshire Local Development Plan is also applicable to
the assessment of the proposals, as it seeks to ensure that on
residential sites, a mix of housing types are encouraged to meet
current and future housing needs and support sustainable mixed
communities in Renfrewshire. 
In this regard, the applicant has committed to provide thirty two units
for affordable housing (27% of the overall unit numbers proposed for
the site) to be secured via the approval of plans and a S75 Agreement
(commensurate with the provisions of Policy I8) to ensure these
homes remain affordable for their lifetime. This will provide affordable
housing which will be housing sold at 15% below market value for this
site and the area and will comprise the flatted units proposed within
the development. 
This was also the agreed solution to the delivery of affordable homes
by the same developer at their ongoing development site further along
King’s Inch Road and it is considered that this approach to providing
new affordable homes on the site without the requirement for public
funds to subsidise the build would be in line with both the Adopted
Renfrewshire Local Development Plan and Scottish Planning Policy
and present a range and choice of homes on this site and area. 
It is therefore considered that the proposal complies with Policy P3 of
the Adopted Renfrewshire Local Development Plan (2021). 
On such sites, which are considered to be acceptable in principle, the
development requires to be assessed in detail considering layout,
design and aspects of the proposals against the criteria for
implementing the Spatial Strategy of the Development Plan and the
Council's New Development Supplementary Guidance. 
This assessment is as follows: 
1) Residential Amenity   
The proposal adopts the ‘place’ qualities set out in the Supplementary
Guidance and the Council's own Residential Design Guidance in that
the layout is built around a landscaped framework which fits and
connects well with the surrounding area. 
The proposal sets out a residential layout which respects privacy and
outlook, with appropriate garden sizes and an overall good and well
considered development pattern for the site. 
The proposal complies with the Renfrewshire Local Development Plan
Policy P1, the associated Supplementary Guidance and the Places
Page 187 of 192

Page 194

Renfrewshire Council Planning and Climate Change Policy Board Page 6 
Checklist for the reasons stated above and in that the development
would adequately respond to the surrounding areas, by achieving
appropriate residential frontage and streetscape as well as a well-
connected network of pedestrian and cycle links. 
2) Streets and Surface Finishes 
Development should ensure the creation of successful places and
streets over the movement of the car, which this layout suitably
provides. 
Traffic calming measures are to be agreed through the Roads
Construction Consent process, which would aid the reduction in driver
speed and create a safe residential environment.  Suitable variances
in road material have been demonstrated, which would assist in this
regard also.  
3) Road/Cycle/Pedestrian Network and access to Amenity Spaces 
Pedestrian and cycle links are integral to the layout and would provide
a permeable layout for pedestrians and cyclists to Braehead leisure
and retail complex and wider established residential development as
well as allowing for safe routes to schools. This can suitably be
achieved through the imposition of planning conditions. 
It has further been proposed and agreed with the applicant to upgrade
the existing pedestrianised signalised crossing on Kings Inch Road
(southeast of the Kings Inch Road roundabout that accesses Laymoor
Avenue) to accommodate the increase in pedestrians using the
crossing as stated within the Transport Statement submitted in
support of this application. 
These routes would be adequately overlooked in line with the
requirement of the Places Development Criteria set out in the
Supplementary Guidance. 
Access to the site for vehicles would be taken from Laymoor Avenue,
with additional pedestrian links throughout the site. 
Sufficient visitor parking would also be ensured and dispersed
throughout the site, as agreed with Roads Development via planning
condition, commensurate with Policy I1. 
4) Design, Plot Configuration and Finishing Materials 
At the site entrance, and along King’s Inch Road, properties
adequately address the street frontage. 
In terms of density and form the units proposed vary from two storey
to four storey (flats), within an area of mixed development types. 
The flats along the site boundaries respect the established pattern of
development within the wider Ferry Village redevelopment and are in
Page 188 of 192

Page 195

Renfrewshire Council Planning and Climate Change Policy Board Page 7 
accordance with the original masterplan concept. 
Finishing materials also respect existing built form surrounding the
application site. 
Policy I7 'Renewable and Low Carbon Developments' and the
associated Supplementary Guidance requires all major proposals to
consider the feasibility of meeting the development's heat and
demand through a district heating network or other low carbon
alternatives. 
There are no district heating networks which could be utilised as part
of the proposal or opportunities to provide for heat demand through
the creation of such a facility, therefore the applicant shall ensure low
carbon targets are achieved through design and via the building
warrant process. 
5) Boundaries and Open Space 
The development would incorporate a Locally Equipped Play Area
adjacent to the underground pump station to the south west of the site 
as well as smaller pockets of open space throughout. Active frontages
would address these spaces to create an inclusive environment. 
Soft (hedging & shrubbery) boundary treatments are to feature within
the development, with fencing locations to create plot definition. 
6) Landscaping 
The planting specification contained within the landscaping proposals
for the site is considered acceptable in ensuring an appropriate level
of residential amenity and sense of place.   
7) Water Management and Site Levels 
The drawings and documentation submitted adequately address the
requirements for drainage and sewerage provision at the site, to the
satisfaction of SEPA and in accordance with Policy I3. 
Conclusion
In view of the above, it is considered that the proposed development
would comply with Policies P1, P3 I1, I3 and I7 contained within the
Adopted Renfrewshire Local Development Plan (2021) and the
associated supplementary guidance. 
In summary, it is considered that the proposal would be in an
appropriate sustainable location, where residential development is
acceptable.   
It would deliver a well-designed housing site as well as support the
objectives of Renfrewshire’s Local Housing Strategy. 
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal
Page 189 of 192

Page 196

Renfrewshire Council Planning and Climate Change Policy Board Page 8 
agreement and conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil,
water and gas contamination within the site); and, if remedial works are
recommended therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the
site investigation report prepared in accordance with current authoritative
technical guidance, has been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use 
2. Prior to occupation of any unit within an identified phase of development, the
developer shall submit for the written approval of the Planning Authority: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported soils are suitable for use on the site
shall be submitted to the Planning Authority and approved in writing 
Reason: To demonstrate that the works necessary to make the site suitable for use
have been completed. 
3. No development shall take place until full details of soft and water landscaping
works have been submitted to and approved in writing by the Planning Authority,
details must comply with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). 
These details shall include, the species, number and spacing of trees and shrubs.
No subsequent alterations to the approved landscaping scheme are to take place
unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard
risk of the application site. 
4. That prior to the commencement of development, details of the location, height
and materials of all new boundary fences, gates or other means of enclosure
Page 190 of 192

Page 197

Renfrewshire Council Planning and Climate Change Policy Board Page 9 
(including around the existing substation) shall be submitted to the Planning
Authority for written approval. 
Reason:  In the interests of visual and residential amenity. 
5. That before any of the dwellinghouses situated on a site upon which a fence is to
be erected is occupied, the fence, or wall, for which the permission of the Planning
Authority has been obtained under the terms of condition 4 above, shall be erected.   
Reason:  To safeguard the amenity of future residents.   
6. That prior to occupation of the last dwellinghouse/flat within the development
hereby permitted, all planting, seeding turfing and earth moulding included in the
scheme of landscaping and planting, hereby approved shall be completed; and any
trees, shrubs, or areas of grass which die, are removed, damaged, or diseased
within 5 years of the completion of the development, shall be replaced in the next
planting season with others of a similar size and species.   
Reason:  In the interests of amenity.   
7. Notwithstanding the consent hereby given, the developer shall ensure the
mitigation measures contained in Section 6.2, pages 28 and 29 and the acoustic
barrier discussed in Section 5.2, pages 20 and 21, paragraph 11, of the approved
Noise Impact Assessment produced by Envirocentre on behalf of Bellway Homes –
Titled - Acoustic Report: Laymoor Avenue Noise Impact Assessment dated 9 May
2022 shall be implemented and complied with during construction and for the
lifetime of the development. 
Reason: In the interests of residential amenity. 
8. Parking for the dwellinghouses hereby approved shall be provided as per the
National Roads Development Guide as shown in the table below provided within
the supporting Transport Assessment prior to completion of the overall
development. 
Reason: In the interests of traffic and pedestrian safety. 
9. The existing signalised crossing on Kings Inch Road (south east of the Kings
Inch Road roundabout) shall be upgraded to accommodate the increase in
pedestrians using the crossing as stated within the TA prior to completion of the
overall development. 
Reason: In the interests of traffic and pedestrian safety. 
10. Prior to the commencement of any construction works on site the developer
shall submit for the written approval of the Planning Authority a servicing plan to
Page 191 of 192

Page 198

Renfrewshire Council Planning and Climate Change Policy Board Page 10 
demonstrate how Block 1, Block 2 and Plots 28-31 can be safely serviced. A new
access to serve Plots 28-31 shall also demonstrate no issues with forward visibility
for vehicles turning right into the access. 
Reason: In the interests of traffic and pedestrian safety. 
11. All access’s and driveways shall be formed as per the National Roads
Development Guide prior to occupation or use of that element of the development. 
Reason: In the interests of traffic and pedestrian safety.   
12. Prior to the commencement of construction works on any dwellinghouse, the
developer shall provide for the written approval of the Planning Authority full details
the Locally Equipped Play Area (LEAP) hereby approved. The details shall
demonstrate that the layout, access and equipment are suitable for use by children
of all abilities and that an appropriate number of inclusive items of play equipment
are installed. Thereafter, prior to occupation of the final residential unit, hereby
approved, the developer shall complete for use, the provision of the LEAP area in
accordance with the detail finally approved. Maintenance of the play area finally
approved, shall be in accordance with a scheme to be agreed between the
developer and the individual occupiers of the development or a factor appointed to
act on their behalf. 
Reason: In the interests of residential amenity. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.       
Page 192 of 192