Renfrewshire Council Planning and Climate Change Policy Board 
Page 1
Planning Application: Report of Handling 
Reference No.    22/0345/PP 
KEY  INFORMATION
Ward: (1) Renfrew
North & Braehead 
Applicant:
Bellway Homes Limited
(Scotland West) 
Registered: 
23 May 2022 
RECOMMENDATION 
Disposed to grant
subject to the conclusion
of a Section 75 legal
agreement and
conditions 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising eighty flats and thirty nine
dwellinghouses and formation of roads, infrastructure, open
space amenity. 
LOCATION: Site On Southern Edge Of Roundabout
Junction With Laymoor Avenue, King's Inch Road, Renfrew 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is identified by Policy P1 of the
Adopted Renfrewshire Local Development Plan (2021). 
• Eight representations have been received which relate to
access arrangements and additional traffic as a result of
the development; the type of development proposed;
availability of services; displacement of wildlife; attraction
of vermin; and ownership. 
• There have been no objections from consultees. 
• The proposals are considered to be compliant with the
relevant policies and guidance of the Local Development
Plan, utilising a brownfield site for the purpose of
regeneration and provision of affordable homes.   
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0345/PP 
SITE ADDRESS  Site On Southern Edge Of Roundabout Junction With Laymoor
Avenue, King's Inch Road, Renfrew
PROPOSAL  Erection of residential development comprising eighty flats and thirty
nine dwellinghouses and formation of roads, infrastructure, open
space amenity
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal
agreement and conditions 
PROPOSALS Planning permission is sought for the erection of thirty nine
dwellinghouses and eighty flats (27% of which are proposed to be
affordable), with associated access, infrastructure and open space at
land on the southern edge of the roundabout junction with Laymoor
Avenue and King's Inch Road, Renfrew. 
The application site extends to approximately 2.59 hectares and is
currently cleared brownfield land. 
The proposals seek to erect a mixture of terraced, semi-detached and
detached dwellings throughout, with flats proposed to the frontage at
King’s Inch Road. The proposed flats would reach a maximum height
of four storeys.   
Pedestrian and cycle linkages are proposed at several locations
throughout the site to existing development and amenity space. 
Vehicular access to the development would be via the existing road
opening on Laymoor Avenue. 
The site is bordered by residential development to the north west,
Howdens factory to the south and Braehead Shopping Centre car
parks to the north east, east and south east. Electrical substations to
serve Braehead are positioned, on the same side of King’s Inch Road
to the proposal and the proposed development takes cognisance of
these in the overall design.   
SITE HISTORY Application No: 22/0098/PP
Description: Change of use of car parking spaces and landscaping to
car wash and valet, siting of portakabin and erection of canopy
Decision: Granted subject to conditions. 
Application No: 22/0356/PP
Description: External alterations including the installation of service
gantry to existing service yard, formation of two doors to east
elevation and removal of existing billboard
Decision: Withdrawn 
CONSULTATIONS Communities & Housing Services - (Environmental Protection
Team) – No objection  subject to conditions.  
Chief Executive’s Service (Roads Development) – No objection

Page 3

Renfrewshire Council Planning and Climate Change Policy Board Page 3 
subject to conditions 
Children’s Services – No objections or contribution required. 
Glasgow Airport Safeguarding - No objection  subject to conditions. 
SEPA – No objections. 
Scottish Water - No objection. 
NATS - No objection. 
REPRESENTATIONS  Eight representations have been received which object to the
proposed development. The issues raised are summarised as follows:
1. Traffic system can’t handle the additional traffic brought by further
housing, resulting in safety issues. Traffic will discourage people from
using the facilities already in place at Braehead. Would encourage an
additional access point onto King’s Inch Road. 
Response – Conditions have been proposed following consideration
by Roads Development of the proposals to ensure compliance with
the relevant policies and guidance. 
2. The location of the site would be better suited for industrial or
commercial development. 
Response: Each application is considered on its own merit as
submitted for suitability. 
3. Council services already stretched, with further housing likely to
cause further impact. 
Response: Noted and consultation comments addressed in this
regard. 
4. Appropriate infrastructure and services require to be in place.
Insufficient GP surgeries, dentists and education and nursery
provision in area for further development of this nature. 
Response: Noted and consultation comments addressed in this
regard. 
5. Renfrew will benefit nothing from further housing at the scale or
type of units proposed. 
Response: Opinion noted. 
6. Building works will cause disturbance to local area. 
Response: Noted, however this would not be a long term impact on
the wider area which would require mitigation measures to be
implemented.

Page 4

Renfrewshire Council Planning and Climate Change Policy Board Page 4 
7. Loss of green space and displacement of wildlife. 
Response: Noted and regulated via alternative legislation which the
applicant is aware of in order to obtain the relevant licences. 
8. Development likely to see an influx of rats just like the development
further along the road. 
Response: Comments noted and to be addressed by Environmental
Protection should this become an issue. 
9. Renfrew needs more green spaces not houses. 
Response: Each application is considered on its own merits as
submitted for suitability. 
10. Boundary requires to be clarified as existing fencing is in
ownership of another party. 
Response: Applicant has confirmed that they shall not extend
development outwith the land in their ownership in order to deliver the
development. 
DEVELOPMENT PLAN
POLICIES
Renfrewshire Local Development Plan (2021)
Policy P1: Renfrewshire’s Places  
Policy P3: Housing Mix and Affordable Housing 
Policy I1: Connecting Places 
Policy I3: Flooding and Drainage 
Policy I7: Renewable and Low Carbon Energy Developments
Policy I5: Waste Management 
Policy I8: Developer Contributions 
New Development Supplementary Guidance (2022)
Delivering the Places Strategy
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; Renewable and Low
Carbon Energy Developments; Flooding and Drainage; and
Development Contributions 
Delivering the Environment Strategy: Noise and Contaminated Land   
Material considerations
Renfrewshire's Places Residential Design Guide March 2015 
PLANNING
ASSESSMENT
The site is located within an area that is covered by Policy P1 of the
Renfrewshire Local Development Plan. Policy P1 states that new
developments should be compatible and complementary to existing
uses and demonstrate that they would cause no significant harm to
these uses.  Given the neighbouring uses it is considered that the
proposed development is capable of positive consideration against the
terms of Policy P1. 
The principle of the proposal, redeveloping a vacant, previously used

Page 5

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
site within an existing place, would also be in line with the Spatial
Strategy as outlined in the Adopted Renfrewshire Local Development
Plan.  The proposal would result in the development of a brownfield
site. 
Policy P3 – Housing Mix and Affordable Housing, set out in the
Adopted Renfrewshire Local Development Plan is also applicable to
the assessment of the proposals, as it seeks to ensure that on
residential sites, a mix of housing types are encouraged to meet
current and future housing needs and support sustainable mixed
communities in Renfrewshire. 
In this regard, the applicant has committed to provide thirty two units
for affordable housing (27% of the overall unit numbers proposed for
the site) to be secured via the approval of plans and a S75 Agreement
(commensurate with the provisions of Policy I8) to ensure these
homes remain affordable for their lifetime. This will provide affordable
housing which will be housing sold at 15% below market value for this
site and the area and will comprise the flatted units proposed within
the development. 
This was also the agreed solution to the delivery of affordable homes
by the same developer at their ongoing development site further along
King’s Inch Road and it is considered that this approach to providing
new affordable homes on the site without the requirement for public
funds to subsidise the build would be in line with both the Adopted
Renfrewshire Local Development Plan and Scottish Planning Policy
and present a range and choice of homes on this site and area. 
It is therefore considered that the proposal complies with Policy P3 of
the Adopted Renfrewshire Local Development Plan (2021). 
On such sites, which are considered to be acceptable in principle, the
development requires to be assessed in detail considering layout,
design and aspects of the proposals against the criteria for
implementing the Spatial Strategy of the Development Plan and the
Council's New Development Supplementary Guidance. 
This assessment is as follows: 
1) Residential Amenity   
The proposal adopts the ‘place’ qualities set out in the Supplementary
Guidance and the Council's own Residential Design Guidance in that
the layout is built around a landscaped framework which fits and
connects well with the surrounding area. 
The proposal sets out a residential layout which respects privacy and
outlook, with appropriate garden sizes and an overall good and well
considered development pattern for the site. 
The proposal complies with the Renfrewshire Local Development Plan
Policy P1, the associated Supplementary Guidance and the Places

Page 6

Renfrewshire Council Planning and Climate Change Policy Board Page 6 
Checklist for the reasons stated above and in that the development
would adequately respond to the surrounding areas, by achieving
appropriate residential frontage and streetscape as well as a well-
connected network of pedestrian and cycle links. 
2) Streets and Surface Finishes 
Development should ensure the creation of successful places and
streets over the movement of the car, which this layout suitably
provides. 
Traffic calming measures are to be agreed through the Roads
Construction Consent process, which would aid the reduction in driver
speed and create a safe residential environment.  Suitable variances
in road material have been demonstrated, which would assist in this
regard also.  
3) Road/Cycle/Pedestrian Network and access to Amenity Spaces 
Pedestrian and cycle links are integral to the layout and would provide
a permeable layout for pedestrians and cyclists to Braehead leisure
and retail complex and wider established residential development as
well as allowing for safe routes to schools. This can suitably be
achieved through the imposition of planning conditions. 
It has further been proposed and agreed with the applicant to upgrade
the existing pedestrianised signalised crossing on Kings Inch Road
(southeast of the Kings Inch Road roundabout that accesses Laymoor
Avenue) to accommodate the increase in pedestrians using the
crossing as stated within the Transport Statement submitted in
support of this application. 
These routes would be adequately overlooked in line with the
requirement of the Places Development Criteria set out in the
Supplementary Guidance. 
Access to the site for vehicles would be taken from Laymoor Avenue,
with additional pedestrian links throughout the site. 
Sufficient visitor parking would also be ensured and dispersed
throughout the site, as agreed with Roads Development via planning
condition, commensurate with Policy I1. 
4) Design, Plot Configuration and Finishing Materials 
At the site entrance, and along King’s Inch Road, properties
adequately address the street frontage. 
In terms of density and form the units proposed vary from two storey
to four storey (flats), within an area of mixed development types. 
The flats along the site boundaries respect the established pattern of
development within the wider Ferry Village redevelopment and are in

Page 7

Renfrewshire Council Planning and Climate Change Policy Board Page 7 
accordance with the original masterplan concept. 
Finishing materials also respect existing built form surrounding the
application site. 
Policy I7 'Renewable and Low Carbon Developments' and the
associated Supplementary Guidance requires all major proposals to
consider the feasibility of meeting the development's heat and
demand through a district heating network or other low carbon
alternatives. 
There are no district heating networks which could be utilised as part
of the proposal or opportunities to provide for heat demand through
the creation of such a facility, therefore the applicant shall ensure low
carbon targets are achieved through design and via the building
warrant process. 
5) Boundaries and Open Space 
The development would incorporate a Locally Equipped Play Area
adjacent to the underground pump station to the south west of the site 
as well as smaller pockets of open space throughout. Active frontages
would address these spaces to create an inclusive environment. 
Soft (hedging & shrubbery) boundary treatments are to feature within
the development, with fencing locations to create plot definition. 
6) Landscaping 
The planting specification contained within the landscaping proposals
for the site is considered acceptable in ensuring an appropriate level
of residential amenity and sense of place.   
7) Water Management and Site Levels 
The drawings and documentation submitted adequately address the
requirements for drainage and sewerage provision at the site, to the
satisfaction of SEPA and in accordance with Policy I3. 
Conclusion
In view of the above, it is considered that the proposed development
would comply with Policies P1, P3 I1, I3 and I7 contained within the
Adopted Renfrewshire Local Development Plan (2021) and the
associated supplementary guidance. 
In summary, it is considered that the proposal would be in an
appropriate sustainable location, where residential development is
acceptable.   
It would deliver a well-designed housing site as well as support the
objectives of Renfrewshire’s Local Housing Strategy. 
RECOMMENDATION Disposed to grant subject to the conclusion of a Section 75 legal

Page 8

Renfrewshire Council Planning and Climate Change Policy Board Page 8 
agreement and conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil,
water and gas contamination within the site); and, if remedial works are
recommended therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the
site investigation report prepared in accordance with current authoritative
technical guidance, has been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use 
2. Prior to occupation of any unit within an identified phase of development, the
developer shall submit for the written approval of the Planning Authority: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported soils are suitable for use on the site
shall be submitted to the Planning Authority and approved in writing 
Reason: To demonstrate that the works necessary to make the site suitable for use
have been completed. 
3. No development shall take place until full details of soft and water landscaping
works have been submitted to and approved in writing by the Planning Authority,
details must comply with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). 
These details shall include, the species, number and spacing of trees and shrubs.
No subsequent alterations to the approved landscaping scheme are to take place
unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as approved. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard
risk of the application site. 
4. That prior to the commencement of development, details of the location, height
and materials of all new boundary fences, gates or other means of enclosure

Page 9

Renfrewshire Council Planning and Climate Change Policy Board Page 9 
(including around the existing substation) shall be submitted to the Planning
Authority for written approval. 
Reason:  In the interests of visual and residential amenity. 
5. That before any of the dwellinghouses situated on a site upon which a fence is to
be erected is occupied, the fence, or wall, for which the permission of the Planning
Authority has been obtained under the terms of condition 4 above, shall be erected.   
Reason:  To safeguard the amenity of future residents.   
6. That prior to occupation of the last dwellinghouse/flat within the development
hereby permitted, all planting, seeding turfing and earth moulding included in the
scheme of landscaping and planting, hereby approved shall be completed; and any
trees, shrubs, or areas of grass which die, are removed, damaged, or diseased
within 5 years of the completion of the development, shall be replaced in the next
planting season with others of a similar size and species.   
Reason:  In the interests of amenity.   
7. Notwithstanding the consent hereby given, the developer shall ensure the
mitigation measures contained in Section 6.2, pages 28 and 29 and the acoustic
barrier discussed in Section 5.2, pages 20 and 21, paragraph 11, of the approved
Noise Impact Assessment produced by Envirocentre on behalf of Bellway Homes –
Titled - Acoustic Report: Laymoor Avenue Noise Impact Assessment dated 9 May
2022 shall be implemented and complied with during construction and for the
lifetime of the development. 
Reason: In the interests of residential amenity. 
8. Parking for the dwellinghouses hereby approved shall be provided as per the
National Roads Development Guide as shown in the table below provided within
the supporting Transport Assessment prior to completion of the overall
development. 
Reason: In the interests of traffic and pedestrian safety. 
9. The existing signalised crossing on Kings Inch Road (south east of the Kings
Inch Road roundabout) shall be upgraded to accommodate the increase in
pedestrians using the crossing as stated within the TA prior to completion of the
overall development. 
Reason: In the interests of traffic and pedestrian safety. 
10. Prior to the commencement of any construction works on site the developer
shall submit for the written approval of the Planning Authority a servicing plan to

Page 10

Renfrewshire Council Planning and Climate Change Policy Board Page 10 
demonstrate how Block 1, Block 2 and Plots 28-31 can be safely serviced. A new
access to serve Plots 28-31 shall also demonstrate no issues with forward visibility
for vehicles turning right into the access. 
Reason: In the interests of traffic and pedestrian safety. 
11. All access’s and driveways shall be formed as per the National Roads
Development Guide prior to occupation or use of that element of the development. 
Reason: In the interests of traffic and pedestrian safety.   
12. Prior to the commencement of construction works on any dwellinghouse, the
developer shall provide for the written approval of the Planning Authority full details
the Locally Equipped Play Area (LEAP) hereby approved. The details shall
demonstrate that the layout, access and equipment are suitable for use by children
of all abilities and that an appropriate number of inclusive items of play equipment
are installed. Thereafter, prior to occupation of the final residential unit, hereby
approved, the developer shall complete for use, the provision of the LEAP area in
accordance with the detail finally approved. Maintenance of the play area finally
approved, shall be in accordance with a scheme to be agreed between the
developer and the individual occupiers of the development or a factor appointed to
act on their behalf. 
Reason: In the interests of residential amenity. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483419705.