Page 1

Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.    22/0236/PP 
KEY  INFORMATION 
Ward: (5)   
Paisley East and
Central 
Applicant:
T100 Ltd. 
Registered: 
19 April 2022 
RECOMMENDATION 
Grant subject to
conditions. 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of self contained
student accommodation with associated facilities, including
demolition. 
LOCATION: 57 High Street, Paisley, PA1 2AN 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The proposal accords with the Adopted Renfrewshire Local
Development Plan (2021) and the New Development
Supplementary Guidance (2022) as well as Historic
Environment Scotland’s Policy Statement.
• Two representations have been received. 
• No objections have been received from any consultees.   
Alasdair Morrison
Head of Economy &
Development

Page 2

Planning and Climate Change Policy Board Page 2 
REPORT OF HANDLING FOR APPLICATION 22/0236/PP 
SITE ADDRESS  57 High Street, Paisley, PA1 2AN
PROPOSAL  Erection of self contained student accommodation with associated
facilities including demolition.
RECOMMENDATION Grant subject to conditions. 
PROPOSALS This application seeks planning permission for the erection of self
contained student accommodation with associated facilities, including
demolition at 55-57 High Street, Paisley. 
The proposed development would comprise of the demolition of the
existing building “Leisure Land” and the erection of development that
would comprise of 150 student studios ranging between 17-22sqm.
The development would be 6 - 7 storeys high and would have a
frontage on High Street and Storie Street. The building would be
approx. 36m high and would incorporate a flat roof design. There
would be a mixed palette of materials which includes aluminium
panels, brickwork masonry with single ply to mansard roofs. The stair
cores would comprise of aluminium composite panels printed with
paisley pattern design. 
The upper 2 levels have been stepped in approx. 2m and 2.75m from
the eastern elevation with a change in materials from the brickwork
masonry to aluminium panels to break up the High Street elevation.
The corner of Storie Street and High Street would have a curved
corten affect façade. 
Access to the building would be obtained via High Street on the
ground floor level. There would also be a secure bike store for 36
bicycles and an off-street secure bin store. The ground floor would
also accommodate a social space with a shopfront façade which
would have glazing to High Street and the Storie Street corner. There
would also be a reception area and a gym. 
The application site is located on the corner of High Street and Storie
Street and is adjacent to the University of West of Scotland (UWS)
Student Union Building and the UWS Campus to the south. Paisley
Museum is also located to the north west of the site. The application
site incorporates Leisure Land at no. 57 High Street and a gap site at
55 High Street which contains self seeded trees. The site area is
approx. 693sqm and is relatively flat along High Street to the north
and is at a steeper incline along Storie street to the west. The area is
characterised by a mix of commercial and residential properties. 
SITE HISTORY An application for conservation area consent (22/0240/CA) in
association with the current planning application has also been
submitted and has have been put forward to today’s Board for
consideration. 
CONSULTATIONS Chief Executive’s Service (Roads Development) – No objections

Page 3

Planning and Climate Change Policy Board Page 3 
subject to conditions. 
Communities and Housing Services (Environmental Protection
Team) – No objections subject to conditions. Concerns have been
raised following the submission of a Noise Impact Assessment with
regards to noise levels affecting the development when windows are
open, particularly with studios that have south facing elevations and
the impact of existing plant. 
Glasgow Airport Safeguarding – No objections subject to
conditions. 
NATS – No objections. 
Scottish Water- No objections. 
West of Scotland Archaeology Service (WOSAS) - No objections
subject to conditions. 
REPRESENTATIONS  One representation has been received where concerns were raised
regarding the following:   
• massing of the development, design and overdevelopment,
• negative visual impact on conservation area,
• loss of daylight and overshadowing, 
• loss of privacy, 
• small social space and green space,
• questions over whether students would also reside in the
accommodation previously approved for the student
accommodation at the TA Hall (20/0217/PP),
• loss of trees 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021)
Policy C1 - Renfrewshire's Network of Centres
Policy ENV3 - Built and Cultural Heritage
Policy I1 - Connecting Places
Policy I3 - Flooding and Drainage
Policy I5 - Waste Management 
Policy I7 - Zero & Low Carbon Buildings 
Policy I8 – Developer Contributions 
New Development Supplementary Guidance (2022)
Delivering the Centres Strategy: Strategic Centres 
Delivering the Environment Strategy: Built and Cultural Heritage
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; Flooding and Drainage;
Zero and Low Carbon Buildings; and Developer Contributions
Delivering the Environment Strategy: Noise and Contaminated Land 
Material Considerations 
Historic Environment Scotland's Historic Environment Policy for
Scotland (HEPS) 2019 and associated "Managing Change in the
Historic Environment" guidance notes.

Page 4

Planning and Climate Change Policy Board Page 4 
PLANNING
ASSESSMENT
The application site is identified in the Adopted Renfrewshire Local
Development Plan (2021) as part of Renfrewshire’s network of
centres.
Policy C1 - Renfrewshire's Network of Centres states that each of
the centres in Renfrewshire form part of a diverse, interconnected
network of places to live, shop, work, enjoy entertainment, leisure and
cultural activities.  
The Policy also states that the Council welcomes development that
will strengthen the network and enhance its centres, ensuring they are
places which are vibrant, inclusive, accessible and complementary, as
well as compatible with surrounding land uses.  
The New Development Supplementary Guidance also states that the
proposed uses should not undermine the principal function of the
centre and is complementary to existing uses and activities and that
the scale, design and layout should also contribute towards and
compliment the surrounding area.
The town centre is recognised as being a hub for a mix of uses, and
the proposed student accommodation will contribute positively to this
mix. 
The development will contribute to the viability of Paisley Town Centre
by redeveloping a vacant building and gap site that occupy a visually
prominent location withing the conservation area. 
The proposed use will also generate additional residence and footfall
within the town centre, contributing positively to economic viability. 
Increasing the number of students living in the town centre is a key
objective for the High Street and University area as defined in the
Paisley Town Centre Action Plan, and it is recognised that increasing
the resident population within the town centre plays a vital role in
supporting the day and night time economy.
It is considered that the proposal would be a positive addition, creating
a high quality place which would enhance the built and cultural
heritage of the Centre. 
Policy ENV3 - Built and Cultural Heritage and Historic Environment
Scotland's guidance both state that the built heritage which includes,
listed buildings and conservation areas should be safeguarded and
enhanced, where appropriate. 
The New Development Supplementary Guidance also states that high
standards of design should be employed which have regard to the

Page 5

Planning and Climate Change Policy Board Page 5 
architecture and character of the area and ensure the maintenance
and enhancement of local distinctiveness.
Historic Environment Scotland were consulted on the application for
conservation area consent (22/0240/CA) in association with the
current planning application and advise that the existing buildings
which would be demolished, do not make a positive contribution to the
conservation area and that designs for the replacement building
should seek to preserve and enhance the character of the
conservation area.
It is considered that careful consideration has been given to the
design of the building, including the height, given its prominent
location. As detailed above, the upper floors at the east of the building
have been stepped in with a change in materials to break up this
elevation to create a gap between the neighbouring building at no. 53
High Street which sits at a much lower height. A feature corner would
also be created at the Storie Street corner with a shop like frontage at
groundfloor level. The Storie Street corner would also incorporate a
similar curved edge to the sandstone traditional property at 59 High
Street and would also sit slightly lower in height. It is considered that
the proposed development would have a positive impact on the
character and appearance of High Street.  Existing and proposed
visuals from the south end of Storie Street have also been provided
which demonstrate that the visual impact from this aspect would also
be acceptable. It is not considered that visuals from other areas would
be necessary given that the building would not be readily visible from
New Street and the north elevation adequately demonstrates the
visual impact from Orr Street.
In view of the above, it is considered that the scale, massing and
materials would have a positive impact on the surrounding built
heritage.
Policy I1 ‘Connecting Places’ – This policy recognises that
increased access and connectivity to walking, cycling and public
transport networks is a key consideration for investment locations
within Renfrewshire.
The site is within a sustainable location, and is highly accessible with
respect to walking, cycling and public transport routes. The wide
range of amenities within the town centre are all within walking
distance of the site.
The proposals satisfy the policy objective of appropriate provision
being made to connect to active travel as well as allowing for walking,
cycling and public transport being considered from the outset. The
development would provide secure bike stands. Given the

Page 6

Planning and Climate Change Policy Board Page 6 
development is for student accommodation and is within a town centre
location, vehicular parking at the site is not proposed which is
considered to be consistent with Government sustainable policies
given the accessibility of the location. 
Policy I3 ‘Flooding and Drainage’ – The proposal does not increase
the risk of flooding. A condition with respect to a Drainage Impact
Assessments and SUDs could also be imposed.
Policy I5 - Waste Management – It is proposed to provide enclosed
secure bin storage. At present, there are bins on the footpath adjacent
to the gap site at no. 55 High Street which are rented by local
businesses. The applicant has written to the businesses to inform
them of the planning application and to offer room for the bins within
the secure bin shelter. This would improve the visual amenity of the
area by removing bins from the footpath.
Pre-application discussions were also undertaken with the Council’s
Waste Operations with regards to the proposed bin storage
arrangements and no objections were raised. A planning condition
has been attached to control this matter.
Policy I7 - Zero & Low Carbon Buildings - seeks to encourage
energy efficiency in new buildings, and the installation of technology
that produces low or no amounts of carbon dioxide emissions. 
The applicants have submitted a statement which states that the
development would be built to exceed the current building regulation
requirements for new buildings. A number of efficiency measures will
be employed in the design and operation of the development in order
to minimise the ongoing carbon footprint of the building.  At detailed
design stage an SBEM calculation can be provided in order to
demonstrate performance. These measures will ensure the
development accords with Policy I7.
Policy I8 – Developer Contributions states that contributions will be
sought for the items such as education, health care, traffic
management etc. to address infrastructure deficits and/or a shortfall in
infrastructure capacity that arise as a direct result of new
development. Any contribution sought will be appropriate,
proportionate, necessary and relevant to the nature of the
development, its scale and its location.
In this regard, it is not considered that the development would result in
infrastructure deficits that would require contributions.
Representations

Page 7

Planning and Climate Change Policy Board Page 7 
With regards to the concerns raised in representations: - 
• Massing of the development, design and overdevelopment,
Although the development has a total of 7 floors, the top floor has a
mansard roof with dormer windows which are set back from the
elevation such that it would have the appearance as having 6 floors
from Storie Street. As detailed above, it is considered that careful
consideration has been given to the design of the building, including
the height and material given its prominent location in the Town
Centre Conservation Area. It is not considered that the development
amounts to overdevelopment of the site.
• Negative visual impact on conservation area,
For the reasons detailed above, it is not considered that the proposal
would have a detrimental impact on the character or appearance of
the Town Centre Conservation Area
• Loss of daylight and overshadowing, 
The development has been designed such that the parapet of 5th floor
is similar to the height of the parapet of the adjacent property at 20
Storie Street. The floor to floor height of the apartments have also
been reduced in height from 3.2m to 2.8m which would reduce the
height of the originally proposed building by approx. 1.2m. The
parapet at the 4th floor has also been reduced by 800mm. Whilst it is
noted that there will be shadowing and loss of sunlight to properties at
no. 59 High Street, it is considered that due to higher density
development, buildings within a town centre location may be more
susceptible to overshadowing. It is considered that the proposal has
been designed to take shadowing and daylight into consideration. 
• Loss of privacy, 
The internal area of the apartments have been designed such that any
glazing elements would be restricted to kitchen or desk worktops. The
applicant has also confirmed that net curtain fabric would be fitted for
increased privacy during daytime and blackout blinds during night time
hours. Notwithstanding this, it is considered that in a town centre
environment there may be a loss of a degree of privacy due to higher
density development. 
• Small social space, loss of green space and trees,
It is considered that the level of social space is acceptable, particularly
as this is a town centre higher density development. It is also
considered that the gap site at no. 55 is overgrown and the self
seeded trees do not positively contribute to the conservation area. It is

Page 8

Planning and Climate Change Policy Board Page 8 
considered that the development of this site as part of the
development would be a welcome improvement and would ensure
that the site is utilised by a viable use all to the benefit of the vitality of
the town centre.
• Questions over whether students would also reside in the
accommodation previously approved for the student accommodation
at the TA Hall (Ref:20/0217/PP),
This is not a material planning consideration and would be a matter for
the applicant to consider.
Consultee Comments
With regards to the concerns raised by the Council’s Communities
and Housing Services (Environmental Protection Team) with respect
to noise levels affecting the development with windows open, whilst it
is noted that this is not ideal, this would mainly be attributed to south
facing units which may be impacted by existing plant. Acceptable
standards can be achieved with windows closed and given the town
centre location and that the development does not relate to permanent
residential dwellings, it can be accepted in this instance subject to the
imposition of the attached planning conditions.
Conclusion
It is considered that the proposal would provide a development which
would significantly improve the vitality and viability of the Town Centre
whilst also enhancing and protecting the built heritage of the
surrounding area. The development would be complimentary to
surrounding uses and would also comprise of the redevelopment of a
prominent vacant site all to the benefit of the Town Centre
Conservation Area.
RECOMMENDATION Grant subject to conditions. 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions 
1. That prior to the commencement of the development hereby approved, full
details and/or samples of the facing materials to be used on all external
walls and roofs shall be submitted to, and approved in writing by,
Renfrewshire Council as Planning Authority.  Thereafter only the approved
materials shall be used in the development of the site.

Page 9

Planning and Climate Change Policy Board Page 9 
Reason:  In the interests of visual amenity. 
2. That prior to the commencement of the development hereby approved, a
comprehensive transitionary land use plan, including detailed timescales,
showing precisely what will be happening on all areas of the site during the
various stages of the redevelopment process. This will include details of:
the demolition process, the various construction phases and the extent and
location of the construction compounds required to deliver development on
all parts of the site. 
Reason: To safeguard the character and appearance of the conservation       
area during the demolition and construction process. 
3. No development shall commence on site until written approval of: 
(a) a Site Investigation report (characterising the nature and extent of any
soil, water and gas contamination within the site); and, if remedial works are
recommended therein 
(b) a Remediation Strategy and Implementation Plan identifying the
proposed methods for implementing all remedial recommendations
contained within the site investigation report 
all prepared in accordance with current authoritative technical guidance,
have been submitted to and approved in writing by Renfrewshire Council as
Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
4. That prior to the occupation of any unit on the site: 
(a) a Verification Report confirming completion of the works specified within
the approved Remediation Strategy and Implementation Plan; or 
(b) where remediation works are not required but soils are to be imported to
site, a Verification Report confirming imported materials are suitable for use 
shall be submitted to and approved in writing by Renfrewshire Council as
Planning Authority. Verification Reports shall not be submitted on a phased
basis unless first agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for
use have been completed. 
5. That prior to the commencement of the development hereby approved, the
developer shall secure the implementation of archaeological works in
accordance with a written scheme of investigation which has been
submitted by the applicant and approved by the Planning Authority. 
Thereafter, the developer shall ensure that the programme of
archaeological works is fully implemented and that all recording and
recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority.

Page 10

Planning and Climate Change Policy Board Page 10 
Reason: To ensure that any archaeological remains which may be
disturbed can be identified, excavated and recorded. 
6. That prior to commencement of above ground works a Bird Hazard
Management Plan shall be submitted to, and approved in writing by, the
Planning Authority in consultation with Glasgow Airport. For the avoidance
of doubt, the submitted plan shall include details of: 
• Management of and flat/shallow pitched green roofs on buildings
within the site which may be attractive to nesting, roosting and
“loafing” birds. The management plan shall comply with Advise Note
8 ‘Potential Bird Hazards from Building Design.’ 
The Bird Hazard Management Plan shall be implemented as approved on
completion of the development, and shall remain in force for the life of the
development. No subsequent alterations to the plan are to take place
unless first submitted to and approved in witing by Renfrewshire Council as
Planning Authority in consultation with Glasgow Airport. 
Reason: It is necessary to manage the development in order to minimise its
attractiveness to birds which could endanger the safe movement of aircraft
and the operations of Glasgow Airport. 
7. That prior the commencement of the development hereby approved, the
applicant shall submit for the written approval of Renfrewshire Council as
Planning Authority, details of a designated drop off and pick up area. For
the avoidance of doubt, this should include the exact location and design of
the pick up area. 
Reason: This information has not been provided. 
8. That prior to the commencement of the development hereby approved, the
applicant shall submit for the written approval of Renfrewshire Council as
Planning Authority, a Construction Traffic Management Plan. For the
avoidance of doubt, this plan shall demonstrate how, during demolition and
build phase, there will be no detrimental impact on pedestrian/cyclist/public
transport and the local road network. 
Reason: This information has not been provided. 
9. That prior to the commencement of the development hereby approved, a
Drainage Impact Assessment shall be submitted and approved by
Renfrewshire Council as Planning Authority. The Drainage Impact
Assessment shall accord with the ‘Council’s Drainage Assessment – Notes
for Guidance’. 
Reason: To ensure adequate provision for drainage associated with the
development. 
10. That prior to the commencement of the development hereby approved,
confirmation shall be submitted in writing to Renfrewshire Council as
Planning Authority and certified by a suitable qualified person that a
scheme to treat the surface water arising from the site has been prepared in

Page 11

Planning and Climate Change Policy Board Page 11 
accordance with the principles and practices contained in “The SuDS
Manual” (CIRIA report C753, published in November 2015).  Thereafter, the
certified scheme shall be implemented prior to the completion of the
development and maintained thereafter to the satisfaction of Renfrewshire
Council as Planning Authority. 
Reason:  In the interests of securing a suitable SuDs scheme for the
treatment of surface water runoff 
11. The design, installation and operation of any plant, machinery or equipment
proposed as part of the development itself shall be such that noise
associated with the development does not exceed Noise Rating Curve
NR25 between the hours of 2300 to 0700 hours and NR 35 at all other
times, when measured within any dwelling in the vicinity of the
development. Structure borne vibration from the proposed development
shall be imperceptible within any dwelling in the vicinity of the development. 
For an explanation of noise rating curves, refer to BS 8233:2014 Sound
insulation and noise reduction in buildings- code of practice, Annex B. 
Reason: In the interests of residential amenity. 
12. Notwithstanding the consent hereby given, the developer shall ensure the
mitigation measures contained in Chapter 6 of the Airshed Report titled
Environmental Noise Assessment for Proposed Residential Student
Accommodation, High Street, Paisley, Renfrewshire (report no. AS 0925
dated 20th July 2022) shall be implemented and complied with during
construction and for the lifetime of the development to the satisfaction of the
Council as Planning Authority. These include the following: 
Road traffic noise 
• Provide acoustic insulation in the form of double-glazing and
mechanical ventilation and heat recovery (MVHR) on all units where
the free-field external noise level at exposed facades is predicted to
exceed 50 dB LAeq 07:00 – 23:00 or 45 dB LAeq 23:00 – 07:00
(74% of all units). The units requiring this additional mitigation are
listed in Table 6.1 of the report and shown in bold red text. 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with BS 8233: 2014 Table 4 noise criteria in habitable rooms.   
Fixed plant noise 
The combined noise from existing and proposed fixed plant will not exceed
Noise Rating Curve 25 (NR25) within all habitable rooms: 
• Where a mechanical ventilation and heat recovery (MVHR) scheme
is required to achieve this these units will have enhanced double-
glazing.

Page 12

Planning and Climate Change Policy Board Page 12 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with NR25 with closed windows and MVHR where appropriate; 
• Prior to occupation of any units, a further assessment of noise from
the proposed fixed plant associated with the developments
heating/ventilation/air conditioning (HVAC) scheme must be
undertaken and submitted for written approval to ensure that noise
levels inside existing and proposed habitable rooms will not exceed
NR25 at night. 
Public house noise 
The noise from music breakout and patrons will not exceed NR15 within all
habitable rooms: 
• Where windows require to be closed a mechanical ventilation and
heat recovery (MVHR) scheme shall be provided. 
• Details of the proposed scheme of acoustic insulation shall be
submitted for written approval, prior to commencement of any works
onsite, to ensure that the proposed mitigation measures will comply
with NR15 with closed windows and MVHR where appropriate. 
No property within the development shall be occupied until all approved
mitigation measures have been completed in full. 
Reason: In the interests of residential amenity. 
13. That prior to the commencement of development a Waste Management
Plan will be submitted for the written approval of the Council as Planning
Authority. For the avoidance of doubt this shall allow for access and use of
the development’s bin storage area by other nearby properties/businesses.
Thereafter the plan shall be implemented in accordance with the approved
arrangements to the satisfaction of the Council as Planning Authority. 
Reason: In the interests of amenity and to control waste. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background