To:  Planning and Climate Change Policy Board
On:  23 August 2022
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Climate Change Action Fund
___________________________________________________________________    
1. Summary 
1.1 As part of the budget approved by Council on 9th March 2020, £1M of funding
was allocated to support the organisation in progressing its response to the
climate emergency through a Climate Change Action Fund. 
1.2  Prior to the formation of the Planning and Climate Change Policy Board, the
Climate Change Sub-Committee had previously considered a number of
funding proposals developed by the organisation in response to the climate
emergency.  Following detailed discussion and engagement with members of
the sub-committee, these proposals were then formally approved by the
Leadership Board, with £978,000 of funding allocated to date from the Climate
Change Action Fund. 
1.3  This paper provides a high-level overview of the progress that has been
achieved to date in terms of the projects and initiatives supported through this
funding. 
2.  Recommendations 
2.1  It is recommended that members of the Planning and Climate Change Policy
Board:
• Note the progress update provided on the initiatives funded through the
Climate Change Action Fund to date;

Page 2

• Note the projected financial outturn position detailed in Table 1 (section 5);
and
• Note and agree the change to scope of projects detailed at section 4.2. 
3.  Background 
3.1 In the budget approved by Council on 9th March 2020, £1 million was
allocated to establish a Climate Change Action Fund which would support the
next steps outlined in the report “Climate Change Emergency”, approved by
Council on 27th February 2020.  The report set out the initial findings and
recommendations of the Climate Emergency Working Group, which had been
convened following the Council’s declaration of a climate emergency in June
2019. 
3.2 The Climate Change Action Fund is intended to fund innovative projects and
initiatives being developed by Council services in response to the climate
emergency; provide initial funding to pilot new ideas and approaches; to
support engagement and partnership working across Renfrewshire; or to
accelerate the pace of change already being delivered through existing
initiatives.  This process is vital to the Council being able to lever in the
external funding that will be required to support climate change initiatives at
the scale and pace required. 
3.3. In particular it is anticipated that several of the feasibility studies will provide a
baseline / evidence to support proactive future funding applications. 
4.  Progress – projects and initiatives supported by the Fund 
4.1  To date, £978,000 of funding has been allocated to support 14 projects
through the Climate Change Action Fund.  A number of these projects relate
to feasibility studies or engagement work with local businesses and
communities, and good progress has been made in terms of progressing
these and appointing relevant suppliers and specialists to support this work. 
Appendix 1 provides specific detail on this progress which includes:
• the Net Zero Business Grant, which launched in May 2022.  This £100,000
discretionary fund offers local Small and Medium Enterprises (SMEs) in
Renfrewshire funding of up to £10,000 to cover up to 50% of eligible costs
to allow them to make changes to their business premises and operations
to reduce their carbon footprint. 15 organisations are currently engaged in
the grant process.
• the Community Climate Fund which provided awards of up to £3K to 18
community organisations across Renfrewshire to develop localised green
community projects and initiatives.  Recommendations for award were

Page 3

approved at the previous meeting of the Planning and Climate Change
Policy Board, with project delivery already underway. 
• a feasibility study looking at the opportunity for a large-scale solar farm on
the former landfill site at Moss Road, Linwood.
• feasibility work at peatland sites in Renfrewshire, to identify restoration
projects to increase carbon storage, enhance biodiversity and improve
flood retention.  
• the development of an active travel strategy focused on accessing the
main areas of employment across Renfrewshire.   
4.2  Leadership Board also approved the allocation of Climate Change Action
funding of £15,000 to carry out energy modelling at an archetype primary
school to develop energy efficient refurbishment options, which could
potentially be replicated across the school estate.  Initially it was anticipated
that Bridget of Weir Primary School would be utilised as the archetype school
however it is now proposed that East Fulton Primary school is utilised for this
purpose. East Fulton Primary School is an archetype of a number of primary
schools in the portfolio and the modelling exercise will inform potential options
for other properties across the school estate.  
4.3  Further project proposals for allocations of the remaining funding will be
brought to future Planning and Climate Change Policy Board for approval. 
5.  Financial Position – Financial Year 2022/23 to 24 June 2022 
5.1  It is anticipated that £556,000 of the £978,000 funding allocated to the
projects detailed in Appendix 1, will be spent over the course of financial year
2022/23 to deliver the Climate Change Fund Programme. 
Table 1: 
Climate Change Fund Programme
Expenditure Programme
Funding 
£’000 £’000
Approved Programme   1,000   
Funding Allocated to Projects  978
Financial Year 2020-21 258 720
Financial Year 2021-22 131 589
Financial Year 2022-23 556 33
Financial Year 2023-24 33 0   
Available Funding  22   
5.2  Expenditure of £389,000 has been incurred in previous financial years. 
£258,000 relates to the Enhancement of Electric Vehicle programme with the

Page 4

remaining £131,000 representing the initial payments on several projects
including the Housing Led Regeneration and Renewal Programme (£48,000)
and the Town Centres Climate Resilience Programme (£30,000).
5.3  A balance of £22,000 remains available for allocation. 
Implications of the Report
1.         Financial – the content of this report relates to allocated funding of £1M from the
Climate Change Action Fund 
2.         HR & Organisational Development – none 
3.         Community/Council Planning – this report includes funding proposals to support
engagement and collaboration with local businesses, partners and communities on
the climate emergency agenda. 
4.         Legal - none 
5.         Property/Assets – none 
6.         Information Technology - none 
7.         Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website. 
8.         Health and Safety - none 
9.         Procurement – none 
10.       Risk – none 
11.       Privacy Impact – none 
12.       COSLA Policy Position – none 
13.       Climate Risk – this report outlines work being undertaken by the Council to respond
to the climate emergency. 
List of Background Papers:
Climate Action Fund: Progress Update, 9 February 2022 Climate Change Sub-Committee 
Author:         Roz Smith, Climate Emergency Lead Officer                        
Chief Executive’s Service

Page 5

Appendix 1 – Update on projects supported by the Climate Change Action Fund 
Name/Description Funding
Allocated Summary Short summary of progress
Housing led
Regeneration and
Renewal Programme
– Zero Energy
Buildings (RenZEB)
£75,000
Renfrewshire Council will develop a
collaborative and an innovative
partnership with a research organisation
to design and deliver a social housing
new build development specification
within the context of the Council
approved Regeneration and Renewal
Programme.
The University of Strathclyde are leading the partnership in
the delivery of research work.  The team summarised the
Council’s 2018 specification, which already complied with
EESSH2 and then successfully evolved three further
iterations of a standard new housing specification – the
2022, 2025 and 2030 specifications – which progressively
reduced carbon emissions by concentrating respectively on
operational, embodied and life-cycle emissions, culminating
in the final (2030) specification’s being theoretically net
zero.  
The next phase of work will carry out further feasibility work
on district heating and/or the use  of ground source heat
pumps as an additional zero-carbon alternative to air
source heat pumps, the use of which is assumed in the
2025 and 2030 specifications.
Enhancement of
Electric Vehicle
Programme
£258,000
As the organisation moves through its
vehicle replacement programme, all
opportunities and external funding
sources are being utilised to develop the
electric fleet. 
In the next phase of its approach,
Environment and Infrastructure are
seeking to introduce electric to different
categories of the fleet, i.e. light
commercials. It is proposed that several
panel vans or transit sized vehicles will
be purchased which will allow the service
A total of 27 electric vehicles were purchased by the
Council utilising funding from the Climate Change Action
Fund and Transport Scotland. 
The 27 electric vehicles consisted of 2off Large 3.5Tonne
Vans, 18off Light Vans and 7off Cars.  These EVs bring the
total number of Fleet EVs to 127 or around 30% of the
Council Fleet.  All 27 vehicles have now been delivered for
operational use.

Page 6

to consider options for introducing these
across the rest of the fleet, with the
opportunity to unlock further external
funding and to inform the future vehicle
replacement programme at potentially a
faster pace. 
This is the single largest vehicle category
within Renfrewshire Council’s fleet and if
electrified would significantly reduce our
carbon emissions while delivering
frontline services.
Feasibility Study -
Photovoltaic Project £30,000
The Energy Management Unit (EMU)
has identified an opportunity to deliver
largescale renewable electricity from
Photovoltaic Panels (PV). The proposed
site is Moss Road in Linwood, this was
previously used as a landfill site, with a
feasibility study to be undertaken.
Consultants have been carrying out the feasibility study,
with the final report due for completion in the coming
weeks.  Cross-council discussions and knowledge sharing
has also taken place with North Ayrshire Council who are
delivering a similar project, also on a former landfill site and
have carried out feasibility, business case modelling, site
investigations, planning, explored grid issues, and are
currently out for tender.
Climate Change
Response –
Programme
Governance
£125,000
Given the scale of the response to the
climate change by Renfrewshire Council
and the need to move this forward at
pace, a climate change officer post will
be recruited on 2 year fixed term basis,
with the initial focus of the role being to
support the drafting of the climate
change adaptation plan, the climate
change sub-committee and to take
forward proposed partnership and citizen
The Climate Emergency Lead Officer was appointed in
September 2021 and is now in post.

Page 7

engagement forums on climate change
issues which have been identified by the
Climate Change Sub-Committee as key
priorities.
Community Food
Growing Proposal £50,000
It is proposed that a large-scale
community food growing initiative within
the Johnstone area is supported. 
As well as bringing land back into
purposeful use, the main aim of the
project would be to maximise the
availability of locally available and fresh
food to people experiencing financial
insecurity and/or health and wellbeing
issues.  It is anticipated that this project
will be progressed in partnership with
local community groups and
organisations, with clear links being
established to community justice
services, community projects and
organisations and local school and care
services to maximise community
involvement and benefit. 
A series of meetings involving local residents have been
held and a nucleus of active participants has been
identified. This core group of activists could form the
committee of a formally constituted group for future funding
applications, tenure arrangements, etc. Local people
visiting the site have identified that this large space already
performs roles as an informal recreational site and
biodiversity conservation resource, so recognise the scope
for this to become a multifunctional space. The group is
keen to investigate further these options to supplement the
main community food growing objectives. The Council’s
Biodiversity Officer has submitted grant application to
NatureScot in a bid to secure supplementary funding for
biodiversity enhancement works from the discretionary
portion of the Scottish Government’s Nature Restoration
Fund – outcome of the application yet to be announced by
NatureScot/Scottish Government. 
Renfrewshire Active
Travel Network -
Feasibility
£75,000
Investment in Renfrewshire’s Active
Travel Network is a priority of the
approved Economic Recovery Plan (Dec
2020). From an economic perspective
there are gaps in the strategic network
and to and from that strategic network,
that would better connect communities to
Specialist consultants have been working with
Regeneration & Place and Environment & Infrastructure
teams to develop an active travel strategy focused on
accessing the main areas of employment across
Renfrewshire.  A large scale survey and a significant
number of employer interviews has been conducted with
the support of the Renfrewshire Chamber of Commerce

Page 8

places of work and study, town centres,
and other economic destinations.
Developing the network and its local
connections would be a significant driver
in offering attractive alternatives to the
use of private cars, particularly for short
journeys and make progress towards
delivering 20-minute neighbourhood
living across Renfrewshire. 
Benefits 
- reducing carbon emissions from travel 
- healthier lifestyles 
- more sustainable local economies and
services
and the Renfrewshire Economic Leadership Panel.  The
report with all of its recommendations to develop new
routes and initiatives to promote travel behaviour change
will be complete shortly and will act as a source document
for the development of specific projects for Council and
external funder support.
Town Centres Climate
Resilience
Programme
£75,000
A certain degree of climate impact is built
into established climate agreements
meaning that some level of climate
warming is expected, leading to greater
variability in climate including heat
events and wetter periods of the year.
Streets and public spaces in town and
local centres will have a role to play in
providing shelter and would benefit
economically by offering good
environments for people. Work is
required to develop a local response to
these issues aimed at delivering
programmes of beneficial interventions in
centres with property owners, residents
and users. 
This major piece of work will conclude shortly. The report is
in two stages with the first reviewing the extents of potential
climate impacts on Renfrewshire’s town centres and the
potential measures that should be given consideration; to
prevent significant disruption, to resolve ongoing pressures
on the levels of human comfort and useability due to
climatic factors and to assess new opportunities in town
centres with the emergence of new economic sectors that
could have a town centre presence.  Six projects have
been taken into a second more detailed stage for
development.  These relate to active travel, green/blue
infrastructure, measures to mitigate climate discomfort,
local food production and recycling/circular economy. 
Projects will be costed and at a point where further design
stages and/or businesses cases could now progress with
further funding.

Page 9

Benefits 
- more climate resilient communities 
- supporting local centres from further
economic impact 
- providing enhanced and local places as
attractive alternatives to those further
afield (e.g. climate controlled indoor
centres) - and therefore reducing the
need to travel
Peatland Restoration £10,000
The degradation and erosion of upland
and blanket peat bogs is contributing to
the loss of carbon sinks. There are
significant peatland resources in the
ownership of the council albeit under
tenancy to farmers on Glennifer Braes
and Muirshiel, and there are lowland
peat bogs within the extended site at
Bishopton. The feasibility of a
programme of peat moss restoration, as
part of the NatureScot (NS) programme -
Peatland ACTION, should be tested to
inform further discussions with owners,
tenants and conservation experts.
Benefits - carbon storage - enhanced
biodiversity - enhance water/flood
retention in upland catchment areas 
£10,000 is required to support an initial
feasibility study, so as to be well
positioned to bid for external funding
There has been good progress at two of the three
candidate sites identified by Renfrewshire Council and
agreed with NatureScot. 
The assessment of the potential for Sergeantlaw Moss has
been completed and works have been specified and
costed. Further progress has been limited by a land
ownership issue which is being investigated. This
investment  to date has been funded entirely from the
Peatland Action Fund. 
The survey of West Tandlemuir Farm has been completed
and identified an extensive peat restoration project to the
SW of the old Barytes Mine, which would require 20 weeks
for specialist contractors to complete at an estimated cost
of £210,776. Officers are liaising with NatureScot’s
Peatland Action team to identify the Council’s next steps for
this project. 
Peatland Action issued a tender for survey and feasibility
study work at Barochan Moss in 2021 but were unable to
award as a result of a lack of suitable bids.  Alternative
approaches are now being considered by NatureScot

Page 10

from a national programme, Peatland
ACTION, which has £250m to invest
over the next 10 years.
although timescales have been extended as result of
resourcing issues within the Peatland Action Team.
Adaptation Plan –
Carbon Budget £50,000
Technical expertise is needed to support
the development of an evidence base in
Renfrewshire in relation to carbon
emissions, and the actions required to
achieve the net zero target set by
Council in 2019.
Phase one of this work, which relates to the baseline
evidence on carbon emissions is now completed.  Officers
worked with technical specialist consultants to calculate (for
both Renfrewshire Council as an organisation and
Renfrewshire area as a whole) the baseline emissions
(using 2014-15 as the baseline year); the current
emissions; and trajectories to 2030 using a best case and
worst case scenario.  The work also developed an
emissions monitoring tool which is based on an open data
platform and can therefore be updated as projects are
implemented and updated data is available.  Phase 2 will
commence shortly which will look holistically and
strategically at actions across all themes of the Plan for Net
Zero with the relevant costings associated to reach net
zero.
Business Survey &
Climate Change
Panel Survey
£20,000
Two immediate priorities are to carry out
a climate emergency survey of
Renfrewshire’s businesses and to survey
and then recruit a representative sample
of Renfrewshire’s population to
participate in a Climate Panel.
Both activities require to happen at pace
in order to influence the content of
Renfrewshire’s net zero plan and it is
proposed that using a research partner,
similar to the approach used for the
Council’s Public Services
The survey of local residents took place in September 2021
and the results were reported to the Climate Change Sub-
Committee. Members of Renfrewshire's Climate Panel
were successfully recruited from the respondents to the
survey.
The work to distribute the Business Survey was paused
due to the emergence of the Omicron variant and impacts
on the business community. The survey question set has
been developed by officers in partnership with
Renfrewshire Chamber of Commerce and scoped and
agreed by the Council’s consultant partner to carry out the
survey. It is anticipated that the survey will now be

Page 11

Panel, will allow the administrative
element of this work to be completed in a
robust and independent manner.
launched in August, with the findings therefore available to
inform Phase 2, the action planning element of
Renfrewshire’s Plan for Net Zero.

Page 12

Net Zero Business
Grant Support £100,000
This proposal aims to encourage local businesses to embrace
net zero ambitions and to support Renfrewshire’s goal of net
zero emissions by 2030. 
With one in three small businesses worried about rising energy
prices, including more than half of SMEs in hospitality and
leisure, this proposal ensures business get the support they
need to cut emissions and their bills at the same time.    
50% grant support (up to £10k per grant) will be offered to
support local businesses to make changes to business
premises and operations. For example, a move to low carbon
heating systems, solar powered energy and other measures to
reduce emissions. 
The grants will be delivered through the Economic
Development Team in line with other similar business grant
funds
The Net Zero Business Grant was
launched in May 2022. 
Applicants are required to submit
details benchmarking their existing
emissions, to be considered for the
grant the project should demonstrate
a reduction in carbon emissions from
this baseline.  Promotion of the fund
is ongoing and SMEs who have
expressed an interest in the fund
have been contacted.  
Energy Modelling –
East Fulton PS (in lieu
of Bridge of Weir PS)
£15,000
Proposal to undertake detailed energy modelling of East Fulton
PS (in lieu of Bridge of Weir Primary School) to facilitate
design and development of enhanced and integrated energy
efficient ‘Enerphit’ refurbishment options.  Note the specific
property is only being used as a data gathering archetype
model rather than funding works/improvements to that location.  
East Fulton PS is an archetype of a number of Primary
Schools in the portfolio and the modelling exercise/data will
inform potential options for other properties across the school
estate.
A specialist consultant has been
identified and engaged to undertake
detailed energy modelling. 
Further internal resources are now
being identified to survey and digitally
plot base information in response to
consultant technical requirements.

Page 13

Charity Shop Pilot –
promoting the circular
economy
£5,000
The Council is working with a national organisation to develop
a charity shop pilot in Renfrewshire, which would help to
support objectives in relation to the circular economy. 
This would operate through a gift voucher model, aiming to
break the stigma and to promote the benefits of accessing and
reusing good quality items on sales within charity shops. 
The pilot will be small scale and will initially involve a shop in
the Paisley locality, with a view to this informing potential
options in other areas of Renfrewshire if successful. 
The gift vouchers would be available through local community
organisations in the first instance to people accessing support
and being interested in this type of option. 
Project is under the final stages of
development and it is anticipated that
pilot will commence prior to end of
2022. 
Sustainable
Procurement
Programme
£40,000 
As previously discussed by the Climate Sub-Committee, the
Council potentially contributes in the region of 3-4% of
Renfrewshire’s carbon emissions, and therefore the leadership
role of the organisation is crucial in terms of working with
citizens and businesses to reduce wider carbon emissions.  An
important element of leadership is through the Council’s
spending arrangements. 
Scottish public procurement legislation includes in law a
Sustainable Procurement Duty which requires that
procurement consider how our contracts can improve the
social, environmental and economic wellbeing of our own area
with a particular focus on reducing inequality.  The core
principles of the Sustainable Procurement Duty are reflected in
our Procurement Strategy and the goals and objectives for the
Following an external recruitment
process, the procurement manager
appointed a Climate Emergency
Adviser (CEA) in June this year on a
fixed term contract with a view to
practice being embedded within the
procurement team and across
services to guide all future activities. 
The CEA provides advice and
support to the procurement team to
ensure that the team have access to
the most up to date training,
guidance and resources which allow
the team to actively contribute to the
Council’s climate change ambitions.

Page 14

procurement team and there is good practice across the
procurement team in this regard. 
The pace of change across markets and in terms of service
requirements in terms of sustainable procurement is
exponential, and it is essential that the Procurement function is
able to maximise sustainable procurement opportunities to
ensure contracting activities support net-zero aspirations
throughout the contract lifecycle, using all relevant tools and
support available and maximising engagement with supply
chains. 
Our ambition is to ensure that the Council not only keeps
abreast of best practice but has an opportunity to engage and
consult with our suppliers, our colleagues and the wider public
sector to help shape and form future Council policy and
innovation.  Funding from the Climate Change Action Fund will
help to develop initial resource to support: 
• The development of a clear framework for training and
development to ensure that our processes support
embedding sustainable procurement in all of our
practice and we actively contribute to the Council’s Net
Zero goal; 
• the development of an approach to monitoring and
recording climate change and circular economy
initiatives throughout the life of contracts; 
• active engagement with Economic Development to help
run events for local businesses about sustainable
procurement and to help them become more
sustainable and focused on tackling the Climate
Emergency; the development of cross functional
roadmaps for major and targeted impact areas setting
out key milestone and targets for action and
implementation. 
The CEA supports the team with the
completion of individual climate
literacy e-learning modules and helps
to ensure that the team understand
how they can effectively take account
of carbon in production, reduce
harmful emissions and promote
reduction in production of waste as
well as encouraging an increasingly
circular approach to specification of
our requirements for goods and
materials.  This learning is reflected
in new contract strategies and
throughout our entire tender
documents. 
The CEA works closely with the
Councils Climate Emergency Lead
Officer and the Green Economy
Officer to help maximise the impact
of procurement, exploring
opportunities for procurement to
support with the delivery of our
climate goals and our community
wealth building aspirations for our
local economy. 
Next steps for the CEA include
working with internal stakeholders
and colleagues in the wider public
sector to help establish a clear
framework for monitoring progress
and for managing contracts to

Page 15

demonstrate the delivery of our
sustainability outcomes.