Notice of Meeting and Agenda
Planning and Climate Change Policy Board 
Date Time  Venue
Tuesday, 14 June 2022 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Jennifer Adam:  Councillor Carolann Davidson:  Councillor Andy Doig: 
Councillor Chris Gilmour:  Councillor Neill Graham:  Councillor Anne Hannigan: 
Councillor John Hood:  Councillor Kenny MacLaren:  Councillor Jamie McGuire: 
Councillor Marie McGurk:  Councillor John McNaughtan:  Councillor Iain Nicolson: 
Councillor John Shaw:    
Councillor Jim Paterson (Convener):    Councillor Bruce MacFarlane (Depute Convener):   
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.

Page 2

Climate Change 
Apologies 
Apologies from members. 
Declarations of Interest 
Members are asked to declare an interest in any item(s) on the
agenda and to provide a brief explanation of the nature of the
interest. 
1 Climate Emergency Work Programme - Progress
Update 
Report by Head of Commissioning & Policy. 
1 - 16 
2 Community Climate Fund - Update 
Report of Head of Policy & Commissioning. 
17 - 26 
Development Management & Planning 
3 Permitted Development Rights 
Report by Chief Executive. 
27 - 30 
4 Renfrewshire Vacant and Derelict Land Strategy 2022 
Report by Chief Executive. 
31 - 34 
5 Supplementry Guidance (2022) and Post Adoption
Strategic Environmental Assesment 
Report by Chief Executive. 
35 - 54 
6 A Guide to Development in Conservation Areas 2022 
Report by Chief Executive. 
55 - 58 
7 Updated Planning Enforcement Charter 2022 
Report by Chief Executive. 
59 - 62 
8 Developer Contributions 
Report by Chief Executive. 
63 - 68

Page 3

9  Lochwinnoch – Station Rise Developer Contribution 
Report by Chief Executive. 
69 - 74 
10  Site Development Briefs - West of Barochan Road,
Houston & Inchinnan Road, Renfrew 
Report by Chief Executive. 
75 - 82 
11  Tree Preservation Order Requests 
Report by Chief Executive. 
83 - 90  
Planning Applications 
Members must deal with planning applications in an objective
manner to ensure that they cannot be challenged with
accusations of bias or predetermination. Votes on planning
applications must be seen to be impartial and not influenced by
party political issues. 
12  Planning Applications 
Reports by Chief Executive. 
91 - 92 
12(a)  21/1030/PP: Erection of 49 dwellings with associated
roads, car parking and landscaping Site between
Fordbank Stables and Corseford Avenue, Johnstone 
Report by Chief Executive. 
93 - 112 
12(b)  21/0516/PP: Erection of residential development
comprising 17 dwellinghouses and 8 flats with
associated infrastructure, parking and landscaping;
and erection of relocated greenkeeping facility with
associated storageat land East of Newton Cottage at
Elderslie Golf Club, Newton Avenue, Elderslie,
Johnstone 
Report by Chief Executive. 
113 - 142 
12(c)  22/0057/PP: Erection of drive-through dessert parlour
(Class 1) with associated access and parking at Unit
E,1 Glenburn Road, Paisley, PA2 8TA 
Report by Chief Executive. 
143 - 148

Page 4

No embedded text on this page.

Page 5

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  14 June 2022
___________________________________________________________________
Report by: Head of Policy and Commissioning
___________________________________________________________________
Heading: Climate Emergency Work Programme - Progress Update
___________________________________________________________________    
1. Summary 
1.1 This paper provides a summary of the work undertaken to date by
Renfrewshire Council in response to the climate emergency - outlining the
work of the former Climate Change Sub Committee, established in 2020
following recommendations by the Climate Emergency Working Group and
the approval of a work programme by Council in February 2020. 
1.2  The paper also highlights the development of Renfrewshire’s Plan for Net
Zero, the recently commissioned work on Renfrewshire’s baseline emissions
and trajectory and the plans over the coming months to engage with officers,
members and partners around the draft plan with a view to bringing this to
Board after the summer recess. 
2.  Recommendations 
2.1  It is recommended that members of the Planning and Climate Change Policy
Board:
• Note the progress achieved in relation to the current work programme; 
• Agree the remainder of funding allocated to take forward the Ren ZEB project
be utilised to explore District Heating Options for Housing Regeneration Areas
as outlined in paragraphs 4.3 and 4.4; and
• Note the priority areas for continuing to progress the Council’s response to the
climate emergency as set out at section 6 
Item 1
PACC140622 Page 1 of 148

Page 6

3.  Background 
3.1 Renfrewshire Council declared a climate emergency in 2019, committing to
net zero carbon emissions by 2030 for the whole area of Renfrewshire. This
means reducing carbon emissions as far as possible and then offsetting any
remainder. This target is significantly ahead of both the Scottish and the UK
Government’s own target dates of 2045 and 2050 respectively. 
3.2 Following the declaration, work has been undertaken to develop a programme
to drive the collective strategic response to the climate emergency in
Renfrewshire. The focus has been to develop a plan which sets out how the
Council will work with partners, communities and stakeholders to achieve the
net zero carbon emissions target.   
3.3 Alongside the strategic response, more operational work programmes such as
the Council’s waste services, asset management, active travel etc continue to
support the organisation’s own journey to net zero. Detailed information about
the Council’s emissions is submitted annually to the Scottish Government
through the Public Bodies Climate Change Duties Report. 
4. Progress update 
4.1 £1m was allocated in the 2020/21 budget for the Climate Change Action Fund
to progress the response to the climate emergency. This fund was intended to
support projects that demonstrate innovation to reduce and offset emissions;
assist with changing behaviours and supporting engagement with
communities; and accelerating existing programmes of work. The fund was
also intended to focus on projects which could act as ‘tests of change’ within
services, to help position the Council favourably to take advantage of future
external funding. 
4.2 At the last meeting of the Climate Change Sub Committee in February 2022,
an update report was presented on the Fund, recommending funding to two
further projects which brought the total spend to £978k. Details of all the
projects funded is included at appendix 1. Please note that one of the projects
awarded funding is the Community Climate Fund and an update report on this
is also being presented to this Board. 
4.3 Climate Change Action funding of £75,000 was also awarded for the RenZEB
Innovation Project by the University of Strathclyde and John Gilbert Architects,
as part of the Council’s Housing Regeneration and Renewal programme. This
was to evolve a theoretically net zero carbon standard newbuild housing
specification for future Council developments. This work has now been
completed and the results will be presented to a future meeting of the
Page 2 of 148

Page 7

Planning and Climate Change Policy Board. The cost of this element of the
project was around £50,000 and it is now proposed to divert the remaining
£25,000 to support a feasibility study exploring the implementation of a District
Heating System in one of the eight Housing Regeneration Areas. The system
would primarily provide affordable heating for tenants and other residents but
could also provide a heat source for other Council, public and business
facilities within that area, while helping to meet the Council’s wider climate
change priorities. 
4.4 Elected Members have previously expressed a desire to explore District
Heating within Council housing as a measure to support the Council’s climate
targets. Housing Regeneration Areas such as the Howwood Road Area in
Johnstone offer an excellent opportunity to explore the installation of a District
Heating System as there is sufficient land and scale of housing numbers
alongside large scale energy users such as schools, leisure facilities and
small businesses. This exploratory work would augment the research already
carried out and would allow an informed choice to be made on appropriate
heating and hot water supply systems by comparing capital and operational
costs, maintenance and carbon omissions. This work would also seek to build
on any learning from the district heating initiative which is being implemented
as part of the AMIDS and NMIS developments which is sector leading. 
4.5 Another project funded by the Climate Change Action Fund, the Net Zero
Business Grant was launched in May 2022. This £100,000 discretionary fund
offers local Small and Medium Enterprises (SMEs) in Renfrewshire funding of
up to £10,000 to cover up to 50% of eligible costs to allow them to make
changes to their business premises and operations to reduce their carbon
footprint. To be considered for the grant, applicants are required to submit
details benchmarking their existing emissions along with other relevant
details. SMEs who have expressed an interest have been contacted and the
fund is published on FindBusinessSupport.gov in addition to the Council
website.  
4.6 A key element of a just transition to net zero is community engagement and
collaborative working to build resilient communities and ensure no one is left
behind. In order to ensure Renfrewshire’s Plan for Net Zero is accessible,
relevant and meaningful for citizens, the previous Climate Change Sub-
Committee agreed for a small-scale, informal ‘citizen’s panel’ to be developed,
recruited through the climate survey carried out in September 2021. 
4.7 Renfrewshire Climate Panel has been established, and four cycles of
sessions have successfully taken place. Subjects covered have included the
background to the global climate emergency and explaining why Renfrewshire
declared a climate emergency and what this means; exploring in more details
Page 3 of 148

Page 8

the findings from the climate survey; and single focus sessions on waste and
recycling and active travel. 
4.8 Officers have also met with Engage Renfrewshire and Council colleagues
leading on Renfrewshire’s Social Renewal Plan to discuss further
engagement with particular groups on areas of overlap such as climate
justice, food and fuel insecurity. 
4.9 Officers have established Renfrewshire’s Net Zero Network – an informal
group of community planning partners and representatives from the business
community to offer peer support around climate issues and identify shared
areas of focus and potential opportunities for partnership working. In addition,
in partnership with the Improvement Service, officers have been trained to
carry out carbon literacy training – training which helps to show the carbon
dioxide costs and impacts of the everyday activities how and why to reduce
this - and have already begun to roll this out. 
5. Plan for Net Zero 
5.1 A key deliverable of the climate emergency work programme is the
development of a ‘Plan for Net Zero’ – a high level plan focusing on mitigation
activities and interventions to help reduce the carbon emissions for
Renfrewshire as an area as low as possible by 2030. 
5.2 The engagement and partnership activities outlined above form part of the
foundations of this plan, alongside a significant piece of work commissioned
earlier this year on Renfrewshire’s carbon emissions baseline and trajectory
to allow us to understand our own organisational and area-wide footprints and
allow us to identify the interventions required to meet our 2030 target.
Technical expertise was provided by the climate consultancy Aether who have
complied a draft report which is currently being analysed by officers in
advance of a further draft and access to a data modelling tool as a first phase
of this work. 
5.3 Whilst this work has been underway, the Plan for Net Zero is being drafted,
based around the following proposed themes:  
Page 4 of 148

Page 9

Clean Energy Minimise energy demand, maximise energy efficiency
and transform our energy systems to deliver clean,
affordable energy for all
Sustainable
Transport
Maximise sustainable transport opportunities to deliver
an inclusive, affordable transport system that provides
choice for all
Circular Economy Become a zero-waste society with a circular economy:
minimising waste & maximising reuse, recycling &
recovery of resources rather than treating them as
waste
Connected
Communities
Empower our communities by ensuring a just
transition with social justice at its core
Resilient Place Optimise biodiversity and nature locally to enhance
our natural environment and maximise green
economic opportunities, while planning and preparing
for impacts of climate change 
5.4 To coincide with the engagement around Renfrewshire’s Plan for Net Zero, a
‘Ren Zero’ brand has been developed by the Council’s Communications and
Marketing Team. Alongside the ‘Ren Zero’ tagline, bright and eye-catching
designs have been created, available for use in presentations, social media
releases and on documents, reports and guidance. It is intended these can be
shared with partners and communities as they are not specifically Council
branded. By developing an overarching, recognisable climate ‘brand’ it is
hoped to make the climate emergency agenda more accessible for all, to
show the reach of the issues relating to climate and more clearly identify the
diverse range of activities and actions already undertaken. Examples of the
branding are shown at appendix 2. 
6. Key priority areas 
6.1 Looking ahead to the next quarter, the significant focus will be on the
finalisation of the draft Plan for Net Zero, with consultation on the draft
alongside the findings of the baseline and trajectory report to take place over
the summer. As part of the consultation, it is proposed to hold a special round
of meetings with Renfrewshire Climate Panel and intended to also engage
with underrepresented groups and with children and young people on the
content of the draft report. 
6.2 As previously requested by Elected Members, as part of our Plan for Net Zero
we will also develop an update report specifically aimed for children and
Page 5 of 148

Page 10

young people, given the importance of this agenda for them and to ensure
inclusivity of our approach. 
6.3 As previously reported to the Climate Emergency Sub-Committee, the work to
distribute the Business Survey had been paused but the survey question set
has already been developed by officers and the work scoped and agreed by
the Council’s consultant partner to carry out the survey. The distribution, due
to take place in Spring, has been delayed due to the focus on distribution of
the Public Services Panel and it is anticipated the survey will now be launched
in late June, with the findings therefore available to inform phase 2, the action
planning element of Renfrewshire’s Plan for Net Zero. 
6.4 As considered within a separate report to this Policy Board, recommendations
have been made on the allocation of Community Climate Funding and it will
also be a priority action to award and support the roll out of this funding. 
Implications of the Report
1. Financial – paragraphs 4.3 and 4.4 outline a recommendation to utilise part of the
funding which has already been approved to support the Ren ZEB housing initiative. 
Specifically, it is proposed that £25,000 of the £75,000 funding previously awarded
be utilised to support the additional feasibility study proposed. 
2. HR & Organisational Development – none 
3. Community/Council Planning – this report includes updates and further proposals
to support engagement and collaboration with local businesses, partners and
communities on the climate emergency agenda. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website. 
8. Health and Safety - none 
9.  Procurement – the paper includes an appendix detailing funding agreed for Council
climate projects, including £40,000 for a Sustainable Procurement Programme 
10. Risk – none 
11.  Privacy Impact – none
Page 6 of 148

Page 11

12. COSLA Policy Position – none 
13. Climate Risk – this report outlines work being undertaken by the Council to respond
to the climate emergency. 
List of Background Papers:
Climate Emergency Work Programme – Progress Update 9 Feb 2022, Climate Change Sub
Committee 
Author:   Pauline Moss, Strategy, Policy and Insight Manager 
Chief Executive’s Service 
Page 7 of 148

Page 12

Appendix 1 – Projects supported by the Climate Change Action Fund 
Name/Description Funding
Allocated Summary
Housing led Regeneration and
Renewal Programme – Zero
Energy Buildings (RenZEB)
£75,000
Renfrewshire Council will develop a collaborative and an innovative partnership with a
research organisation to design and deliver a social housing new build development
within the context of the Council approved Regeneration and Renewal Programme.
Enhancement of Electric
Vehicle Programme £258,000
As the organisation moves through its vehicle replacement programme, all opportunities
and external funding sources are being utilised to develop the electric fleet. 
In the next phase of its approach, Environment and Infrastructure are seeking to
introduce electric to different categories of the fleet, i.e. light commercials. It is proposed
that several panel vans or transit sized vehicles will be purchased which will allow the
service to consider options for introducing these across the rest of the fleet, with the
opportunity to unlock further external funding and to inform the future vehicle
replacement programme at potentially a faster pace. 
This is the single largest vehicle category within Renfrewshire Council’s fleet and if
electrified would significantly reduce our carbon emissions while delivering frontline
services.
Feasibility Study - Photovoltaic
Project £30,000
The Energy Management Unit (EMU) has identified an opportunity to deliver largescale
renewable electricity from Photovoltaic Panels (PV). The proposed site is Moss Road in
Linwood, this was previously used as a land fill site, with a feasibility study to be
undertaken.
Climate Change Response –
Programme Governance £125,000
Given the scale of the response to the climate change by Renfrewshire Council and the
need to move this forward at pace, a climate change officer post will be recruited on 2
year fixed term basis, with the initial focus of the role being to support the drafting of the
climate change adaptation plan, the climate change sub-committee and to take forward
proposed partnership and citizen engagement forums on climate change issues which
have been identified by the Climate Change Sub-Committee as key priorities.
Page 8 of 148

Page 13

Community Food Growing
Proposal £50,000
It is proposed that a large-scale community food growing initiative within the Johnstone
area is supported. 
As well as bringing land back into purposeful use, the main aim of the project would be
to maximise the availability of locally available and fresh food to people experiencing
financial insecurity and/or health and wellbeing issues.  It is anticipated that this project
will be progressed in partnership with local community groups and organisations, with
clear links being established to community justice services, community projects and
organisations and local school and care services to maximise community involvement
and benefit.
Renfrewshire Active Travel
Network - Feasibility £75,000
Investment in Renfrewshire’s Active Travel Network is a priority of the approved
Economic Recovery Plan (Dec 2020). From an economic perspective there are gaps in
the strategic network and to and from that strategic network, that would better connect
communities to places of work and study, town centres, and other economic
destinations. Developing the network and its local connections would be a significant
driver in offering attractive alternatives to the use of private cars, particularly for short
journeys and make progress towards delivering 20-minute neighbourhood living across
Renfrewshire. 
Benefits 
- reducing carbon emissions from travel 
- healthier lifestyles 
- more sustainable local economies and services
Town Centres Climate
Resilience Programme £75,000
A certain degree of climate impact is built into established climate agreements meaning
that some level of climate warming is expected, leading to greater variability in climate
including heat events and wetter periods of the year. Streets and public spaces in town
and local centres will have a role to play in providing shelter and would benefit
economically by offering good environments for people. Work is required to develop a
local response to these issues aimed at delivering programmes of beneficial
interventions in centres with property owners, residents and users. 
Benefits 
Page 9 of 148

Page 14

- more climate resilient communities 
- supporting local centres from further economic impact 
- providing enhanced and local places as attractive alternatives to those further afield
(e.g. climate controlled indoor centres) - and therefore reducing the need to travel
Peatland Restoration £10,000
The degradation and erosion of upland and blanket peat bogs is contributing to the loss
of carbon sinks. There are significant peatland resources in the ownership of the council
albeit under tenancy to farmers on Glennifer Braes and Muirshiel, and there are lowland
peat bogs within the extended site at Bishopton. The feasibility of a programme of peat
moss restoration, as part of the NatureScot (NS) programme - Peatland ACTION,
should be tested to inform further discussions with owners, tenants and conservation
experts. Benefits - carbon storage - enhanced biodiversity - enhance water/flood
retention in upland catchment areas 
£10,000 is required to support an initial feasibility study, so as to be well positioned to
bid for external funding from a national programme, Peatland ACTION, which has
£250m to invest over the next 10 years.
Plan for Net Zero – baseline
emissions £50,000
Technical expertise is needed to support the development of an evidence base in
Renfrewshire in relation to carbon emissions, and the actions required to achieve the
net zero target set by Council in 2019.
Business Survey & Climate
Change Panel Survey £20,000
Two immediate priorities are to carry out a climate emergency survey of Renfrewshire’s
businesses and to survey and then recruit a representative sample of Renfrewshire’s
population to participate in a Climate Panel. Both activities require to happen at pace in
order to influence the content of Renfrewshire’s net zero plan and it is proposed
that using a research partner, similar to the approach used for the Council’s Public
Services Panel, will allow the administrative element of this work to be completed in a
robust and independent manner
Net Zero Business Grant
Support £100,000
This proposal aims to encourage local businesses to embrace net zero ambitions and to
support Renfrewshire’s goal of net zero emissions by 2030. 
Page 10 of 148

Page 15

With one in three small businesses worried about rising energy prices, including more
than half of SMEs in hospitality and leisure, this proposal ensures business get the
support they need to cut emissions and their bills at the same time.    
50% grant support (up to £10k per grant) will be offered to support local businesses to
make changes to business premises and operations. For example, a move to low
carbon heating systems, solar powered energy and other measures to reduce
emissions. 
The grants will be delivered through the Economic Development Team in line with other
similar business grant funds
Energy Modelling – Bridge of
Weir PS £15,000
Proposal to undertake detailed energy modelling of Bridge of Weir Primary School to
facilitate design and development of enhanced and integrated energy efficient ‘Enerphit’
refurbishment options.    
Bridge of Weir PS is an archetype of a number of Primary Schools in the portfolio and
the modelling exercise/data will inform potential options for other properties across the
school estate.
Community Climate Fund £50,000
The purpose of the Community Climate Fund is to provide awards of up to £3K to
community organisations to develop localised, green community projects and initiatives
which are tailored to the needs of individual communities.  The aim of this funding is to
encourage participation and raise awareness of the climate emergency within our
communities, with initiatives being designed and delivered by local residents but
supported by the Council.
Charity Gift Shop Pilot –
promoting the circular economy £5,000
Proposals are being developed to pilot an initiative in Renfrewshire which would
promote local efforts in terms of the circular economy, whilst also offering a potential
source of additional support for low-income households. 
Page 11 of 148

Page 16

The pilot is anticipated to work by gift cards being made available to individuals and
families working with local community organisations to purchase clothing and other
items.   
The CSGC organisation would cover all administration costs, liaison with charity shops
and partners and promotion of the service.  This initiative not only helps families in need,
but also fits with climate emergency work as it demonstrates an example of the circular
economy.  Agreement has been reached with one charity shop in Paisley to take
vouchers at present.  The pilot would be expected to start in 2022.
Sustainable Procurement
Programme £40,000 max
As previously discussed by the Climate Sub-Committee, the Council potentially
contributes in the region of 3-4% of Renfrewshire’s carbon emissions, and therefore the
leadership role of the organisation is crucial in terms of working with citizens and
businesses to reduce wider carbon emissions.  An important element of leadership is
through the Council’s spending arrangements. 
Scottish public procurement legislation includes in law a Sustainable Procurement Duty
which requires that procurement consider how our contracts can improve the social,
environmental and economic wellbeing of our own area with a particular focus on
reducing inequality.  The core principles of the Sustainable Procurement Duty are
reflected in our Procurement Strategy and the goals and objectives for the procurement
team and there is good practice across the procurement team in this regard. 
The pace of change across markets and in terms of service requirements in terms of
sustainable procurement is exponential, and it is essential that the Procurement function
is able to maximise sustainable procurement opportunities to ensure contracting
activities support net-zero aspirations throughout the contract lifecycle, using all relevant
tools and support available and maximising engagement with supply chains. 
Our ambition is to ensure that the Council not only keeps abreast of best practice but
has an opportunity to engage and consult with our suppliers, our colleagues and the
wider public sector to help shape and form future Council policy and innovation. 
Funding from the Climate Change Action Fund will help to develop initial resource to
support:
Page 12 of 148

Page 17

• The development of a clear framework for training and development to ensure
that our processes support embedding sustainable procurement in all of our
practice and we actively contribute to the Council’s Net Zero goal; 
• the development of an approach to monitoring and recording climate change and
circular economy initiatives throughout the life of contracts; 
• active engagement with Economic Development to help run events for local
businesses about sustainable procurement and to help them become more
sustainable and focused on tackling the Climate Emergency;
• the development of cross functional roadmaps for major and targeted impact
areas setting out key milestone and targets for action and implementation. 
Page 13 of 148

Page 18

Appendix 2 – Examples of the Ren Zero branding 
Examples of the primary logo with different icons separating the words – a range of icons are available: 
Examples of the stacked wording with some different icons: 
Page 14 of 148

Page 19

Example use of the presentation template:    
Page 15 of 148

Page 20

Page 16 of 148

Page 21

___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  14 June 2022
___________________________________________________________________
Report by: Head of Policy and Commissioning
___________________________________________________________________
Heading: Community Climate Fund – Progress Update
___________________________________________________________________    
1. Summary 
1.1 On 17th November 2021, the Climate Change Sub-Committee recommended
for approval the progression of a pilot Community Climate Fund, and the
allocation of £50,000 from the Climate Change Action Fund for this purpose. 
1.2  The purpose of the Community Climate Fund is to provide awards of up to
£3K to community organisations to develop localised, green community
projects and initiatives which are tailored to the needs of individual
communities.  The aim of this funding is to encourage participation and raise
awareness of the climate emergency within our communities, with initiatives
being designed and delivered by local residents but supported by the Council. 
1.3  Following approval of the guidance at Leadership Board on 1st December
2021, the application process was launched with applications accepted
between 31st January and 14th March 2022.  In total 26 organisations applied
to the Community Climate Fund, totalling £71,332.42 from projects across all
Local Partnership Areas.  
1.4 A formal evaluation was undertaken by Council Officers and an external
Officer from Engage Renfrewshire, scoring each application using a matrix
against key outcomes in order to rank projects to allocate the funding to those
that best met the intended outcomes. 
1.5 This evaluation identified 18 eligible projects, across all Local Partnership
Areas and climate themes, with a total combined funding ask of £49,132.42.
Item 2
PACC140622 Page 17 of 148

Page 22

Further information on these projects is attached as Appendix 1 to this report.
Applicants who didn’t receive an award or who were not eligible for inclusion
for this funding route, will be supported to access other sources of funding,
through liaison with other council officers and Engage Renfrewshire. 
2.  Recommendations 
2.1  It is recommended that members of the Planning and Climate Change Policy
Board:
• Approve the allocation of £49,132.42 from the Community Climate Fund to
support the initiatives detailed in Appendix 1 of this report. 
3.  Background 
3.1 Following the Council’s declaration of the climate emergency in 2019, officers
have been working very closely with partners to develop a programme of work
which will drive the collective response to climate change in Renfrewshire.
The core focus of the local programme of work has been to develop a plan
which sets out how the Council will work with partners, communities and
stakeholders to achieve the net zero carbon emissions target by 2030, which
was set by Renfrewshire Council.   
3.2 A key element of a just transition to net zero will be community engagement
and collaborative working to build resilient communities and ensure no one is
left behind.  There is a significant amount of learning and engagement that
needs to take place to support our local communities to make the changes
that will be required to achieve the net zero emissions target by 2030.   
3.3 On 17th November 2021, the Climate Change Sub-Committee recommended
for approval the progression of a pilot Community Climate Fund, and the
allocation of £50,000 from the Climate Change Action Fund for this purpose. 
3.4  The purpose of the Community Climate Fund is to provide one-off grant
funding of up to £3K to community organisations to develop localised, green
community projects and initiatives which are tailored to the needs of individual
communities.  The aim of this funding is to encourage participation and raise
awareness of the climate emergency within our communities, with initiatives
being designed and delivered by local residents but supported by the Council. 
3.5  Successful applications had to demonstrate:
• their understanding of local need and how their project or initiative would meet
this need
Page 18 of 148

Page 23

• how their project or initiative aligns with community resilience, adaptation or
mitigation in response to the climate emergency and local climate change
impacts
• inclusivity, ensuring that services would be easily accessible, particularly
targeting those most in need
• partnership working to signpost people to additional support. 
4.  Community Climate Fund Update 
4.1 Following approval to progress the Community Climate Fund at Leadership
Board on 1st December 2021, the application process was launched with
applications accepted between 31st January and 14th March 2022.  In total 26
organisations applied to the Community Climate Fund across all Local
Partnership Areas – with applications totalling £71,332.42. 
4.2  A formal evaluation process was undertaken, with Council Officers and an
external Officer from Engage Renfrewshire scoring each application using a
scoring matrix with weightings against key outcomes, including carbon
reduction; promotion of clean energy, sustainable transport and active travel,
circular economy, local food growing, and/or helping nature locally;
sustainable skills supported and developed; positive impacts on children and
young people and/or vulnerable groups; and assisting loneliness/isolation and
social outcomes. 
4.3 This evaluation identified 18 eligible projects to be recommended for award of
funding, with a total combined funding requirement of £49,132.42.  These
projects are broadly located across all 7 Local Partnership Areas and cover
key climate themes, including energy, sustainable transport, circular economy,
local food growing and nature-based projects.  Details on the 18
recommended projects can be found in Appendix 1. 
4.4 This funding will support community organisations to develop local projects
and initiatives which align with the drive to net zero and help build resilience
within communities from the impacts of climate change.  There are also
opportunities for these exemplar projects to be replicated across other areas
within Renfrewshire and for learning to be shared among our communities. 
4.5 Opportunities for collaborative working have also been identified through the
application process, for example, there were a number of growing projects
which require similar equipment so there is potential to help them access
refurbished tools and encourage tool sharing via a tool library rather than
purchasing, which also supports circular economy aims. 
4.6 In addition, Council officers, in partnership with Engage Renfrewshire, will
work with applicants who were ineligible or who didn’t receive an award in
Page 19 of 148

Page 24

order to signpost to alternative sources of funding.  Projects who were
ineligible or who are not recommended for an award are set out in Appendix
2.     
4.7 Members of the Planning and Climate Change Policy Board are asked to
approve the award recommendations as set out in Appendix 1.     
4.8 Progress on all projects funded through the Community Climate Fund will be
monitored and reported back to the Planning and Climate Change Policy
Board. 
4.9 This funding programme underlines the wide range of significant progress
which continues, at pace, to ensure the Council is a climate-responsible
organisation, recognising our impact on our environment, our opportunities to
do things differently and our ability to work with others to influence meaningful
and long-lasting change, while making our communities safer, fairer and
healthier places to live, work and spend time in. 
Implications of the Report
1. Financial – the paper includes a recommendation in relation to the Climate Change
Action Fund in section 4 
2. HR & Organisational Development – none 
3. Community/Council Planning – this report includes updates and further proposals
to support engagement and collaboration with local businesses, partners and
communities on the climate emergency agenda. 
4. Legal - none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because it is for noting only. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website. 
8. Health and Safety - none 
9.  Procurement – none 
10. Risk – none 
11.  Privacy Impact – none 
Page 20 of 148

Page 25

12. COSLA Policy Position – none 
13. Climate Risk – this report outlines work being undertaken by the Council to respond
to the climate emergency. 
List of Background Papers:
Climate Emergency Work Programme: Progress Update, 17 November 2021 Climate Change Sub-
Committee 
Author:   Roz Smith, Climate Emergency Lead Officer 
Chief Executive’s Service
Page 21 of 148

Page 26

Appendix 1 – Applications recommended for Community Climate Fund support approval
Applications recommended for Community Climate Fund support approval
ORGANISATION FUNDING
REQUESTED
LOCAL
PARTNERSHIP
AREA
NAME & PURPOSE OF THE PROJECT
Tannahill Centre £2,953.00
Paisley North,
West and
Central
Climate Cooking Challenge: to support the local community to reduce their carbon footprint and become
more resilient to the impacts of climate change whilst also helping to address issues relating to food and
energy poverty by supporting local families:
o reduce food waste by sharing techniques and skills in relation to making the most of raw food
products, leftovers and surplus food that can be accessed via the Community Market
o reduce energy consumption through more efficient preparation of food (e.g. through batch cooking)
o produce non-electric slow cookers using recycled household materials
Lochwinnoch
Sustainable
Community
Garden
£1,000.00 The Villages
Rewilding Lochwinnoch: to improve biodiversity in the local area while creating an opportunity for
community participation and outdoor education.  Wildflower seeds and sowing kits will be distributed
directly to community members and also through partnerships with other organisations.  This will improve
biodiversity and create natural habitat for bees and other pollinators and help to rewild our roadsides and
pathways as well as people's own gardens.  This will be an interactive project, accessible for all, and will
be an activity that will contribute to community wellbeing at a time when many are struggling with
isolation.
24th Paisley Boys
Brigade £3,000.00
Paisley North,
West and
Central
24th Paisley BB Climate Challenge 2022: to reduce carbon footprint by reducing energy consumption
through improved energy efficiency measures; learning to grow food for people and wildlife through
turning over church lawns to wildflower meadow and edible garden to benefit nature, biodiversity and
teach about local food growing. 
Kirklandneuk
Primary School
Parent Council
£3,000.00 Renfrew
'Mon the Weans, 'Mon the Bees, 'Mon the Community!: to provide an outdoor space that allows pupils
to express their feelings, learn, role play and channel their creative skills and provide the school and local
community the opportunity to be involved in food growing and preparation (including food hygiene
training) and opportunities to learn about creating a biodiversity area within the school grounds.
Own Yer Bike £3,000.00
Paisley North,
West and
Central
Own Yer Bike - Volunteer Training/Parts for Repairs: to train 5 x volunteers to silver level velotech cycle
mechanics course, leading to more qualified mechanics to teach local young people how to maintain and
fix their bikes.  This gives volunteers a recognised qualification, enabling them to go on and become cycle
mechanics which will also improve their own chances of employment.  The funding will also enable cycle
parts for repairs to be purchased.
Page 22 of 148

Page 27

ORGANISATION FUNDING
REQUESTED
LOCAL
PARTNERSHIP
AREA
NAME & PURPOSE OF THE PROJECT
Friends of
Howwood Park £2,840.60 The Villages
Howwood Park Pavilion Renovation - Insulation and Low Energy Electrical Fittings: to renovate a
derelict football pavilion in an environmentally friendly manner, to minimise energy demand and
maximise energy efficiency to make the building as environmentally friendly as possible and ensure CO2
emissions are minimal when the building is back is use.
Langbank Parent
Partnership £3,000.00
Paisley North,
West and
Central
LPS Community Garden - All the flowers of tomorrow are the seeds of today: to establish the garden as
an extension to the outdoor classroom, where staff and pupils will learn about the environment,
conservation, gardening, science and experience the natural world. 
Transforming a piece of land to be productive and a place to meet, will bring people together, young and
old, with a common interest where they will harvest friendships and deep bonds, encouraging
intergenerational relationships.  Pupils will grow fruit, vegetables and herbs.  They will harvest the
produce and share what they don't use with the community.  
The Good
Shepherd Centre
(GSC)
£2,855.00
Erskine,
Inchinnan,
Bishopton and
Langbank
GSC Community Garden: Improved lifestyle choices, increased awareness of the importance of continued
reduction of carbon footprint and associated physical, mental health and wellbeing benefits of the
outdoors underpins our planned project. 
The project will develop a ‘fork to fork’ approach utilising GSC’s garden contributes to GSC Young People’s
Climate Change Agenda.  Working in partnership with Duke of Edinburgh Award, GSC School & Wellbeing
Teams will add value by contributing horticultural skills and curriculum development to support young
people’s ambitions to drive to net zero.  
Local Energy
Action Plan £3,000 The Villages
Diggin' It Together: a food growing initiative supporting people in our area to grow their own food from
their own homes, and in community spaces which will:
o reduce carbon emissions by reducing food miles, packaging and industrial processes around food
production
o promoting mindfulness of the issues around food production and food waste which is contributing to
our climate crisis
o tackling food insecurity by empowering people with knowledge and skills to grow food themselves,
by sustainable methods
o contribute to a sense of wellbeing and getting people outdoors
o create opportunities for people to come together at community events and connect, as part of a
neighbourly gardening club, reducing social isolation 
Page 23 of 148

Page 28

ORGANISATION FUNDING
REQUESTED
LOCAL
PARTNERSHIP
AREA
NAME & PURPOSE OF THE PROJECT
Renfrewshire
Rainbow
Buddies
£2,220.00 Johnstone and
Linwood
Renfrewshire Rainbow Buddies Little and Large Explorers: to do up Johnstone Castle Community Centre
garden along with exploring our local forestry area, working with local classes to provide wooden items
for us to decorate, make the garden a nice place to be within and also provide appropriate equipment to
explore our local areas by active travel.  The community garden will enable everyone to learn new skills
including planting, making flower beds, road safety and food hygiene.
Ferguslie Cricket
Club £2,000.00 Gleniffer
Climate Change Projects: to help sustainability and climate change through two key areas: 
1. installation of LED lighting throughout our premises which will help reduce energy consumption and
make the building more energy efficient
2. creation of a small garden area within our grounds for growing a variety of plants which will enhance
and support biodiversity, insects and bees
Ferguslie
Community
Development
Trust
£2,871.00
Paisley North,
West and
Central
F.C.D.T Sunshine On Ferguslie  (Schools Project): environmental improvements to front gardens to help
encourage interest and raise awareness in the local environment, coupled with opportunities to learn
new gardening skills and access to new plants.  The project will facilitate sessions to allow local people to
get involved in the construction of garden planters and birdboxes, create community gardening clubs,
raise awareness of the benefits of gardening and being outdoors and raise awareness of climate change
through education.
Mossvale
Community
Church
£2,510.00
Paisley North,
West and
Central
Sewing2gether All Nations - Repair Make Do & Mend: to run a series of sewing Make Do & Mend
Workshops at Sewing2gether All Nations, a group providing support for members of the refugee and
asylum seeker community; to create Make Do & Mend videos for the wider public; and to produce a
Mending Skills Toolkit, including all the essential items each household would require to continue to fix
items at home.  By repairing, mending, altering and fixing existing / donated clothing textiles will be saved
from landfill.
Williamsburgh
Parent Council £2,897.22 Paisley East
Getting Williamsburgh Growing!: to support children of all ages to learn about growing our own food.  As
well as the obvious benefits from getting outside – planting and seeing the seeds grow and harvesting the
fruits and vegetables – partnership working with appropriate organisations will support teachers by
providing local food growing advice building capacity for both teachers and pupils.  This project will lead
to improvements not only for physical health and wellbeing through increased activity, but also for mental
health too.  The project will be embedded in the school curriculum across all ages in reference to themes
around sustainability and climate change, health and wellbeing and will enable the recently formed
gardening club to thrive.
Page 24 of 148

Page 29

ORGANISATION FUNDING
REQUESTED
LOCAL
PARTNERSHIP
AREA
NAME & PURPOSE OF THE PROJECT
Renfrew YMCA
SCIO £3,000.00 Renfrew
Make Renfrew Green: to start implementing up-cycling into our organisation.  This project will inform
young people of what up-cycling is, how it can benefit our environment and help with stopping climate
change as well as teaching young people practical skills.  By teaching young people all about the effect
that fast fashion is having on our world and the part it plays on climate change we hope this project will
inspire young people to talk to their families and their peers about this so that they can make a further
impact on the local community.  The project will celebrate the importance of community-led action by
hosting an eco-friendly fashion show to show the clothing and household items that have been upcycled.
Bonnie
Bishopton £3,000.00
Erskine,
Inchinnan,
Bishopton and
Langbank
Community Gardens at Community Centre: to regenerate neglected land covered in debris and weeds,
creating two distinct themed community gardens using plants small trees and shrubs which will provide
food, water and shelter for bees and butterflies all year round.  The project will connect villagers with
each other and improve their health and wellbeing by creating a garden together and achieving a feeling
of self-worth, whilst enjoying the floral attraction.  Creating a space for our elderly villagers to sit at our
Happy to Chat Bench enjoying memories evoked by sensory fragrant plants and meet people, combatting
loneliness.
Finding Your
Feet (FYF) £3,000.00
Paisley North,
West and
Central
FYF Charity Hub Garden: to reclaim an area of disused land and turn it into a garden and play area for all
charities in the hub to use.  The land has not been used since the 1960s when it was used to store coal –
the project would enhance the space and make it useable for our community.  The FYF Charity Hub garden
will provide a sensory garden, outdoor children's accessible play area, nature walks, beekeeping and
therapeutic gardening activities for everyone who uses the hub to enjoy.
Sculpture House
Collective (CIC) £2,985.60
Paisley North,
West and
Central
Sculpture House Community Dye Garden: to explore the opportunities for developing a community Dye
Garden on the grounds of the Sculpture House Collective expanding to satellite locations across the
Ferguslie Park area.  The greenspaces will be used to grow plants and trees that can be used for dyeing
and printing textiles. The aims are to: 
1. engage the local community in a collaborative program of education, wellbeing and creativity 2.
Increase climate resilience by tackling biodiversity loss across underused greenspaces
3. Educate the public on issues of everyday pollution and sustainability as they relate to clothing and
textiles.
Page 25 of 148

Page 30

Appendix 2 – Applications not recommended for Community Climate Fund support 
ORGANISATION FUNDING
REQUESTED NAME & PURPOSE OF THE PROJECT COMMENTS
St. Marks
(Oldhall)
Church
£3,000.00 St. Marks Green Team 2022: Project 2022 sets out to reduce energy consumption in the
church and its halls and separate waste at source
Not recommended for
award
Youth with a
Mission  £3,000.00
Stanely House Climate Impact Reduction and education:
1) Reduce climate emissions (carbon dioxide and methane) from the historic, category B listed
Stanely House, Paisley.
2) Communicate to visitors about how the steps that achieved this did so, and by how much,
with updates in future.
Not recommended for
award
Paisley West
Church £3,000.00 Recycling & Lighting: to help improve the recycling within the church by all church groups and
also to assist with the installation of LED lighting throughout our premises
Not recommended for
award
REMODE
RENFREWSHIRE
CIC
£3,000.00 Community Garment Re-use Scheme: a 40-week programme to promote and encourage
clothing re-use and to prevent textiles reaching landfill
Not recommended for
award
WHAT IF
Paisley Ltd £3,000.00
Outdoor Community Space at WHAT IF Phase 1: to create outdoor space in the centre of town
for community groups and individuals to meet in a safe space with the option to grow plants
and veg in raised beds, and take part in outdoor workshops
Not recommended for
award
Shopmobility
Paisley &
District
£2,700.00
Improve capacity providing opportunities to develop skills and personal development
through volunteering: We know customers are experiencing social isolation and loneliness as
statistics tell us that.  These funds will enable us to purchase lunches, water, uniforms, safety
equipment, access accredited and non-accredited training plus a toolbox with tools.
Not recommended for
award
Paisley
Darkside
Historical
Walking Tours
£1,500.00
Recruiting & Retaining Volunteers in Renfrewshire: The purpose of this project is to offer very
interesting and exciting volunteer roles to an additional 50 or more people to help us grow and
develop over the project year.
Not recommended for
award
Glencorse
Residents
Association
£3,000.00 Glencorse Road Woodland project: to regenerate a bit of common land that is between our
building and housing on Stranka Avenue to become a managed bit of Scottish woodland
Not recommended for
award 
Page 26 of 148

Page 31

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Permitted Development Rights
___________________________________________________________________ 
1. Summary 
1.1 The Scottish Government has recently published a review of Permitted
Development Rights. 
1.2 This report provides an overview of the topics covered by the review and
outlines how officers will prepare and submitted a response in line with the
deadline set.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
 Note that The Scottish Government have published a review of permitted
development rights and are seeking comments on proposed changes from
interested parties. 
 Note that Officers are currently reviewing the consultation paper and will
prepare a response in line with the timetable set out by The Scottish
Government. 
 Note that the response will be submitted following liaison with the Convenor
and Depute Convenor. 
_________________________________________________________  
Item 3
PACC140622 Page 27 of 148

Page 32

3. Background 
3.1 The Scottish Government is currently carrying out a review of permitted
development rights as part of the wider planning reform programme. 
3.2 A consultation document has recently been published and interested parties
are invited to make comments on the proposed changes to permitted
development rights and the use class order. 
3.3 Comments require to be submitted to Scottish Government by 3rd August
2022. 
4. Proposed Changes 
4.1 Permitted development rights and the use class order have the effect of
allowing certain works or changes of use to take place without the need to
seek planning permission from the planning authority.   
4.2 The consultation document sets out and seeks views on proposed changes to
permitted development rights and the use class order.  Specifically, the
proposals relate to the following: 
 Electric vehicle charging infrastructure 
 Changes of use is centres and other locations 
 Port development 
4.3 The consultation paper can be viewed at
https://www.gov.scot/publications/review-permitted-development-rights-
phase-2-consultation/pages/2/ 
5. Next Steps 
5.1 Officers are currently reviewing the consultation paper in order to prepare a
response in line with the timetable set out by The Scottish Government. 
5.2 The next board meeting is scheduled to take place after the deadline of the
consultation and in this regard, it is proposed that Officers prepare a response
and liaise with the Convenor and Depute Convenor prior to formal submission
to The Scottish Government.   
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None.
Page 28 of 148

Page 33

3. Community/Council Planning – the consultation document outlines potential
changes to permitted development rights and the use classes which would have
an impact on how certain developments are considered and consented.   
4. Legal – None.   
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None. 
13. Climate Risk – N/A.
___________________________________________________________________ 
Author:           David Love, Chief Planning Officer. 
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk   
Page 29 of 148

Page 34

Page 30 of 148

Page 35

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Renfrewshire Vacant and Derelict Land Strategy 2022
___________________________________________________________________ 
1. Summary 
1.1 The Renfrewshire Local Development Plan (2021) sets out a commitment to
reduce, reuse and repurpose vacant and derelict land across Renfrewshire. 
1.2 The Renfrewshire Vacant and Derelict Land Strategy (2022) identifies a
number of actions to promote redevelopment, re-use or repurpose of
previously used land and encourage positive outcomes to support the
enhancement of places, deliver sustainable economic growth and promote
greener living, stimulate nature recovery by increasing biodiversity across
Renfrewshire. 
1.3.  The strategy is available to view on the Council’s website at Vacant and
Derelict Land Strategy 2022.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
(i) Approves the Renfrewshire Vacant and Derelict Land Strategy 2022. 
___________________________________________________________________ 
3. Background 
3.1 This is the third vacant and derelict land strategy for Renfrewshire. While the
amount of vacant and derelict land is reducing each year it remains a priority
to reuse, redevelop and repurpose land across Renfrewshire. 
Item 4
PACC140622 Page 31 of 148

Page 36

3.2 The Renfrewshire Vacant and Derelict Land Strategy 2022 sets out actions
which will contribute to making Renfrewshire a more sustainable place and
continuing to reduce the amount of vacant and derelict land. The
implementation of these actions aim to secure positive effects for biodiversity
by greening local environments, having better, healthier and more vibrant
neighbourhoods, creating new employment opportunities and assisting in
mitigating the effects of the climate crisis. 
3.3 The strategy identifies five key themes and a series of related actions. The
five themes are: 
• Infrastructure-first approach to investment to support sustainable inclusive
economic growth and unlock development potential of stalled sites;
• Prioritise development on brownfield and previously used land;
• Local Living - supporting development in and around our town and village
centres; 
• Consider the potential of innovative delivery mechanisms; and
• Support nature positive places that will be more resilient to the impacts of
the climate crisis and support the recover and restoration of our natural
environment. 
3.4 Renfrewshire’s vacant and derelict land is monitored each year through the
preparation and submission to the Scottish Government of the Scottish
Vacant and Derelict Land Survey (SVDLS). 
3.5 The Renfrewshire Vacant and Derelict Land Strategy will be reported bi-
annually to the relevant Council Board.
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be
confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Reshaping our place, our economy, and our future – The Renfrewshire
Vacant and Derelict Land Strategy 2022 sets out a series of actions to reduce
the amount of vacant land which has the potential to regenerate
neighbourhoods, improve local environments and create new employment
opportunities. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None.
Page 32 of 148

Page 37

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – The strategy supports the re-use of vacant and derelict land
for a range of uses including those which can help address the climate crisis
by managing flood risk and providing biodiversity enhancements.
___________________________________________________________________ 
Author: Sharon Marklow, Place Strategy Manager
Tel: 0141 618 7835, email: Sharon.marklow@renfrewshire.gov.uk 
Page 33 of 148

Page 38

Page 34 of 148

Page 39

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: New Development Supplementary Guidance (2022) and Strategic
Environmental Assessment Post Adoption Statement
___________________________________________________________________ 
1. Summary 
1.1 This report presents the responses from the recent consultation on the draft
New Development Supplementary Guidance (2022) which ended on 22nd April
2022 and seeks approval for the guidance which will support the Renfrewshire
Local Development Plan 2021. 
1.2 The report also presents the Renfrewshire Local Development Plan Post
Adoption Statement which forms part of the strategic environmental
assessment process which ran in tandem with preparation of the
Renfrewshire Local Development Plan 2021. 
1.3 A copy of both the New Development Supplementary Guidance and the post
adoption statement are available on the Council’s website at Local
Development Plan page.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the Renfrewshire New Development Supplementary Guidance
(2022) and authorises the Head of Economy and Development to notify
the Scottish Ministers of the Council’s intention to adopt the supplementary
guidance. 
(ii) Approve the publication of the Strategic Environmental Assessment Post
Adoption Statement. 
___________________________________________________________________
Item 5
PACC140622 Page 35 of 148

Page 40

3. New Development Supplementary Guidance 2022 
3.1 The Communities, Housing and Planning Policy Board approved the draft
New Development Supplementary Guidance for consultation at its meeting of
15 March 2022.  The Guidance was then subject to a 4 week consultation
period with local communities and a range of other stakeholders. 
3.2 The draft New Development Supplementary Guidance supports the
implementation of the Renfrewshire Local Development Plan 2021 by
providing additional detailed information in relation to designing, delivering
and implementing development, with an emphasis on place making,
sustainability and inclusive processes. 
3.2 16 responses to the consultation were received from local residents, a
community council, the Scottish Government, key agencies and developers. A
summary of the representations, with feedback/commentary on suggestions
and proposed additional changes to the supplementary guidance is attached
at Appendix 1. 
4. Post Adoption Statement Strategic Environmental Assessment 
4.1 In line with the Environmental Assessment (Scotland) Act 2005 the
Renfrewshire Local Development Plan 2021 has been subject to the process
of strategic environmental assessment.  At each stage of the local
development plan process there has been detailed consideration and
assessment of the likely environmental factors and effects associated with
preferred and alternative options, strategies, policies and proposals.  It then
considered how negative impacts can be avoided or minimised and identified
opportunities for positive effects to be enhanced. 
4.2 The Strategic Environmental Assessment shaped and positively contributed
towards the finalised version of the Renfrewshire Local Development Plan
2021.  Publication of the post adoption statement is the final stage in the
process, and it illustrates how the environmental report influenced and
informed the local development plan. 
5. Next Steps 
5.1 If approved by the Board, the New Development Supplementary Guidance will
be sent to the Scottish Ministers along with a summary of all representations
received during the preparation process and the Council’s response and
actions to these representations. 
5.2 The Scottish Ministers have 28 days to consider the supplementary guidance.
After 28 days have elapsed, the Council can adopt the supplementary
guidance unless Scottish Ministers have directed otherwise. 
Page 36 of 148

Page 41

5.3 Following adoption, the supplementary guidance will be available on the
Council’s website and hard copies will be available in local libraries. 
5.4 The post adoption statement will be sent to the Strategic Environmental
Assessment Gateway for circulation to the statutory consultees NatureScot,
Historic Environment Scotland and Scottish Environmental Protection Agency. 
It’s publication will be advertised in a local newspaper and it will be published
on the Council’s website. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – None. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Reshaping our place, our economy, and our future – the New Development
Supplementary Guidance set the framework for supporting, encouraging, and
delivering sustainability, climate change adaption, reaching Net Zero,
biodiversity gain and creating great places. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None.
Page 37 of 148

Page 42

13. Climate Risk – The New Development Supplementary Guidance seek to
ensure that any development coming forward is undertaken in a sustainable
manner and aids the adaption required as a result of climate change.
___________________________________________________________________ 
Appendix 1 – New Development Supplementary Guidance Consultation Responses 
___________________________________________________________________ 
Author: Sharon Marklow, Place Strategy Manager. 
Tel: 0141 618 7835; Email: sharon.marklow@renfrewshire.gov.uk 
Page 38 of 148

Page 43

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Number Consultee Summary  Renfrewshire Council Response 
01 Network Rail  No comments to make. Noted 
02 Historic
Environment
Scotland  
Confirm that they are content with the draft guidance and have no further comments to offer Noted 
03 Paisley East and
Whitehaugh
Community Council 
No observations to make. Noted 
04 Strathclyde
Partnership for
Transport 
Are supportive of its content and have no further comment. Noted
05 Dawn Homes  Are comfortable with the majority of the provisions within Supplementary Guidance (SG) and how they would
help facilitate the delivery of housing. Note that the SG is focused on the delivery of business and industry
developments in specific locations to deliver a strong economy. Dawn Homes feels that a successful
housebuilding industry both enables and contributes to the delivery of a successful economy. 
In terms of connecting places note that there must be the case that a significant number of otherwise
effective housing sites are not going to entirely achieve all of the requirements as set out in the SG. 
Suggest the following changes:
• In relation to the first criterion, which currently states: ‘Development proposals require to be sited at
locations which are well served, etc, etc’ change to Aim to ensure that …’. ‘Require’ is over
prescriptive; 
• In relation to criterion four: ‘Public transport, etc …’.  ‘should’ here does it mean that a degree of
pragmatism would be applied to the 400 metre walking distance. PAN 75 states that the 400 metre
distance is simply a recommendation and should not be imposed as a mandatory requirement; 
• Bullet point 11 refers to a ‘proposed requirement’ to provide electric vehicle charging stations as an
integral part of new developments or redevelopment proposals. Dawn Homes support this but
suggest that, in certain areas, the required overall supply capacity is not available to ensure delivery. 
Noted 
Policy I1 – Connecting places sets out the policy context for connectivity within Renfrewshire and
provides the necessary hooks for the supplementary guidance. The supplementary guidance is
reflective of the general thrust emerging from draft NPF4.  NPF4 states that development proposals
should aim to support sustainable travel and transport based around the 20 minute neighbourhood
principal where we are reducing the need to travel unsustainably, decarbonising our transport
system and promoting active travel are key. The first criterion in ‘Connecting Places’ is reflective of
this approach. No changes required to criteria. 
The emerging NPF4 states that planning applications for significant travel generating uses should not
be supported at locations which would increase reliance on the private car and where access to local
facilities via public transport networks would involve walking or wheeling more than 400m. Criterion
4 is no different to current policy, guidance or advice set out by the Scottish Government.  No
changes required to criteria. 
Policy I4 – Renewable and Low Carbon Energy Developments provides the policy link from the local
development plan for the requirement for electric vehicle charging stations to be an integral part of
any new development or redevelopment proposal. The emerging NPF4 states that development
proposals should demonstrate the provision of electric, hydrogen, and other low or zero-emission
vehicle and cycle charging points that are provided in safe and convenient locations.  The criteria in
bullet point 11 will be amended to reflect this: 
Change Page 16, Bullet 11 from 
• Development requires to provide electric vehicle charging stations as an integral part of new
development or redevelopment proposals; to 
• Development should demonstrate the provision of electric, hydrogen, and other low or
zero-emission vehicle and cycle charging points as an integral part of new development or
redevelopment proposals. 
Item 5
PACC140622 Page 39 of 148

Page 44

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Have concerns over the requirement to consider the feasibility of meeting the development’s heat demand
through a district heating network as there is no clear guidance against which to test either the ‘feasibility’ or
viability for district heating. 
In relation to commuted sums, the final criterion states ‘Where there is a high concentration of affordable
housing in the area and the provision of a commuted sum would help achieve, etc.’ What sources of
information does the Council possess that will confirm where the ‘areas of high concentration’ might be?
There needs to be accessible information and the Council is best placed to provide this. Expecting the
developer to ‘prove’ this point on what would essentially be on an ad hoc basis would be highly
unsatisfactory.  To implement the policy there has to be a definition of ‘affordable for sale’ which is updated
regularly.   
There should be provision for a hybrid approach to some sites where part of the affordable requirement
could be met on site and a commuted sum for the remainder of the requirement to be used elsewhere.  The
role of the private rented sector in meeting the overall requirements of affordable housing must be
recognised. 
The proposals in the SG for housing in the green belt would lead to an unnecessary increased restriction and
this may not allow the delivery of the 2019 Act’s ambition to ‘ensure the long-term stability of rural places’.
To require single dwelling applications for housing in the countryside to be tested/assessed against any
overall housing land shortfall is an unnecessary burden.  The SG should make provision for urban edge sites
that offer active travel, 20 minute neighbourhoods, community infrastructure if there are insufficient
sustainable and deliverable brownfield sites to meet the LDPs development requirements. 
Greenbelt boundaries should be accurately identified and not just a boundary around the existing settlement
approach. 
The general thrust of the biodiversity policy is supported however seek clarification on the line ‘To maximise
the benefits for a diverse natural environment, new development proposals require to .’ does this
requirement apply to all new developments and, if not, where are the guidelines on deciding on where they
should apply to be found? The guidelines provided in the Annex are for where the decision that there is a
requirement has already been taken. 
Policy 14 Renewable and Low Carbon Energy Developments and Figure 10 of the local development
plan set the context for heat networks in Renfrewshire. The supplementary guidance is in line with
the emerging NPF4 requirements on heat and cooling where heat networks can help contribute to
Scotland’s net zero ambitions. No change to supplementary guidance is required. 
The Council are currently preparing a local housing need and demand assessment to provide a
comprehensive and robust evidence base to inform local housing needs, which will inform the
application of the affordable housing policy.  This information will support the local development
plan, supplementary guidance as well as the Renfrewshire Local Housing Strategy ensuring the
appropriate delivery of affordable housing provision in Renfrewshire. No change to supplementary
guidance is required. 
As set out in the local development plan Policy P3 Housing Mix and Affordable Housing and the
affordable housing section of the supplementary guidance, early discussion at pre-application stage
with the planning authority will be required to establish affordable housing requirements and the
most appropriate mix of affordable housing to be provided on all sites of 50 or more dwellings. A
hybrid approach may be considered appropriate during these discussions. No change to the
supplementary guidance is required. 
Policy ENV1 Green Belt and the supplementary guidance criteria listed on page 38 set out clearly the
criteria for where residential developments will be considered appropriate where there is a housing
land shortfall which satisfies Policy ENV1 Green Belt and Policy 8 of ClydePlan.   The guidance on
page 37 of the supplementary guidance relates to all development proposals in the greenbelt and
the guidance on page 38 relates to all residential proposals in the greenbelt. This guidance is not
limited to circumstances where there is an identified housing land shortfall and contains
development guidance which is important to protect Renfrewshire’s greenbelt from inappropriate
development. Again in line with current and emerging Scottish Government Policy, the current
policy and guidance framework in both the local development plan and the supplementary guidance
aims to increase the density of Renfrewshire’s existing settlements, promoting local living by limiting
urban expansion and using land around our towns and villages wisely. There is currently no
requirement to identify urban edge sites.   No change to the supplementary guidance is required. 
The local development plan clearly identifies a robust green belt boundary and this was reviewed,
consulted upon and thoroughly examined through the robust local development plan preparation
process. No change to the supplementary guidance is required.   
The biodiversity section on page 40 links to Policy ENV 2 Natural Environment providing more
detailed criteria in the supplementary guidance.  This criteria is in line with the emerging NPF4 that
states that proposals for local development should only be supported if they include appropriate
measures to enhance biodiversity, in proportion to the nature and scale of development. No change
is required to  the supplementary guidance. 
06 Persimmon Homes Welcome the additional detail and clarity that the proposed guidance offers and continued flexibility of uses
within proposed transition areas to allow the regeneration of these areas. 
Suggested amendments:
Noted 
Page 40 of 148

Page 45

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Supportive in principle of the criteria listed under Connecting Places on page 16, however it is not practical
for all residential developments to give priority to and allowing penetration by buses.  It is suggested that this
criteria is reworded to read “Where practical make provision within development layouts giving priority to
and allowing penetration by buses;” 
Suggest that depending on the type and scale of residential development it is not practical to provide electric
vehicle charging stations in all housing developments.  It is suggested that the requirement for electric vehicle
charging stations should only relate to non-residential developments. A table detailing development types
and what level of provision is desired would provide clarity on this requirement. 
They recognise the importance of delivering affordable housing within Renfrewshire and that the preferred
option is for the units to be delivered on-site there should be a hybrid option as part of the alternatives where
some units could be delivered on or off-site and the balance made up of a commuted sum. This will allow
flexibility where full provision on-site may not be viable or there is a high concentration of affordable homes
in the area already and full provision may not be sought.
Accept proposed amendment. Bullet point 5 on page 16 will be amended from:
• Ensure provision is made in development layouts giving priority to and allowing penetration
by buses; to 
• Where practical make provision within development layouts giving priority to and allowing
penetration by buses. 
Policy I4 – Renewable and Low Carbon Energy Developments provides the policy link from the local
development plan for the requirement for electric vehicle charging stations to be an integral part of
any new development or redevelopment proposal. The emerging NPF4 states that development
proposals should demonstrate the provision of electric, hydrogen, and other low or zero-emission
vehicle and cycle charging points that are provided in safe and convenient locations.  The criteria in
bullet point 11 will be amended to reflect this: 
Change Page 16, Bullet 11 from 
• Development requires to provide electric vehicle charging stations as an integral part of new
development or redevelopment proposals; to 
• Development should demonstrate the provision of electric, hydrogen, and other low or
zero-emission vehicle and cycle charging points as an integral part of new development or
redevelopment proposals. 
As set out in the local development plan Policy P3 Housing Mix and Affordable Housing and the
affordable housing section of the supplementary guidance, early discussion at pre-application stage
with the planning authority will be required to establish affordable housing requirements and the
most appropriate mix of affordable housing to be provided on all sites of 50 or more dwellings. A
hybrid approach may be considered appropriate during these discussions. No change to the
supplementary guidance is required. 
07
08
09
10
11
Miller Homes 
Taylor Wimpey 
Cala
Stewart Milne 
Barratt Homes
Consider that the signposting in the Local Development Plan to the New Development Guidance is
inadequate. The LDP document includes under each section a note box that draws the reader’s attention to
the policies to which the New Development Guidance will apply but this is not at the beginning of each policy
section and therefore could be missed. In addition, the note box is not explicit about which parts of the policy
additional detail will be provided for. On this basis we do not believe that the LDP adequately signposts the
SPG and therefore question the ability of the SPG, as currently drafted, to be adopted as part of the
development plan. 
Have concerns that in places the guidance goes beyond the scope of the original policy and goes beyond
providing further information or detail. In some cases the requirements set out in the guidance should have
been part of LDP policy that would then have been articulated and tested as part of the LDP examination. On
this basis it is therefore inappropriate for text to be included in just the Guidance. 
Connecting Places
In the opening paragraph the New Guidance states that “All proposals will be considered in line with Policy I1
Connecting Places of the Local Development Plan and the following criteria:”. In order for this to be
acceptable the “following criteria” cannot go beyond the provisions of the LDP policy and must only add
further information or detail to that policy. 
• Bullet point 1 of the New Guidance states that “Development proposals require to be sited at
locations which are well served by public transport and where possible link to public transport hubs
and interchanges;”. However, policy I1 requires only that proposals “ensure appropriate provision
The issue of signposting to the supplementary guidance was examined by the Reporter (Issue 23)
and the Reporter recommended that the note boxes be added to provided clarification and to
strengthen the links between the local development plan and supplementary guidance. No change is
required to the supplementary guidance. 
Page 7 of the Renfrewshire Local Development Plan clearly sets out the purpose and role of the new
development supplementary guidance where it provides additional detailed information in relation
to designing, delivering and implementing development, with an emphasis on place making and
sustainable inclusive development. No change is required to the supplementary guidance. 
Policy I1 Connecting Places sets the policy context for the more detailed connecting places criteria in
the supplementary guidance.   
Accept Change – Bullet Point 1 on page 16 will be amended from 
• Development proposals require to be sited at locations which are well served by public
transport and where possible link to public transport hubs and interchanges; to
Page 41 of 148

Page 46

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
and accessibility” to such not for development to be located at sites that are already well served. This
is beyond the scope of the policy. 
• Consider that bullet point 2 does not adds anything to that already set out in policy I1. 
• Bullet point 3 requires “implementation” of new pedestrian routes and Policy I1 does not.  It should
be noted that development does not always have the means to implement new routes that are
beyond their site boundary, it is unreasonable to require such implementation and should therefore
be deleted. 
• Bullet point 4 goes significantly beyond the provisions of policy I1 and as a result is not acceptable.
Bullet point 4 states “Public transport networks to be accessible within 400 metres walking distance
of the development”. This requirement is far too restrictive and is not supported or justified by local
or national policy, guidance or legislative provisions. Furthermore, it will render some allocated
development sites undeliverable.  It is unclear what the justification is for the 400 metres threshold,
how the 400 metres will be measured and whether this will be from the edge of the site or centre of
the site. 
• Bullet point 5 requires development to “Ensure provision is made in development layouts giving
priority to and allowing penetration by buses”. This requirement is totally disproportionate. By
implication it applies to all development.  Developers have no means to force public transport
provision.  If routes were diverted to meet the requirement of this guidance how will the council
ensure that it is not to the detriment of existing residents or businesses. Furthermore, if a
development site is located in an area with strong existing transport links that are accessible from the
site, it seems unreasonable to ask for further provision to still be required within the site itself. This
requirement is not justified as it goes beyond that that is required by policy I1 and it will not be
practical, viable or deliverable for all types of development and all development sites. 
• Bullet point 6 “Aim to ensure, where development is in close proximity to rail stations/halts, that
provision is made for good direct, safe access to and from these facilities”. It is unclear why this
guidance is required at all when policy I1 states that “All development proposals require to ensure
appropriate provision and accessibility including the ability to connect to active travel networks,
public transport networks, hubs and interchanges and set out how this can be achieved including
through the use of developer contributions, in accordance with Policy I8.” Not all development can
provide direct links to nearby rail stations, and this will be dependent on the location of the sites,
matters of land ownership and the feasibility to access these. It is therefore considered that this
should be required only where appropriate and the guidance should state that, if this provision is to
remain. 
• Bullet point 7 requires that “Connections to and from development are required to be in line with the
‘Getting It Right for Every Child’ approach;”. This is a replication of what is contained in Policy I1 and
the guidance provides no further clarity on the type of development that this applies to. 
• Development proposals require to be sited at locations which ensure appropriate provision
to public transport and where possible link to public transport hubs and interchanges. 
Bullet point 2 provides further guidance to policy I1. No change required. 
Accept Change – Bullet Point 3 on page 16 will be amended from 
• Ensure the implementation of safe pedestrian routes to public transport, schools, local
services and open space from the proposed site; to 
• Where required, ensure the implementation of safe pedestrian routes to public transport,
schools, local services and open space from the proposed site; 
Policy I1 – Connecting places sets out the policy context for connectivity within Renfrewshire and
provides the necessary hooks for the supplementary guidance. The supplementary guidance is
reflective of the general thrust emerging from draft NPF4.  NPF4 states that development proposals
should aim to support sustainable travel and transport based around the 20 minute neighbourhood
principal where we are reducing the need to travel unsustainably, decarbonising our transport
system and promoting active travel are key. The first criterion in ‘Connecting Places’ is reflective of
this approach. 
The emerging NPF4 states that planning applications for significant travel generating uses should not
be supported at locations which would increase reliance on the private car and where access to local
facilities via public transport networks would involve walking or wheeling more than 400m. Criterion
4 is no different than any other current policy, guidance or advice set out by the Scottish
Government.  No changes required to criteria. 
Accept this amendment. Bullet point 5 on page 16 will be amended from:
• Ensure provision is made in development layouts giving priority to and allowing penetration
by buses; to 
• Where practical make provision within development layouts giving priority to and allowing
penetration by buses 
Accept this amendment. Bullet point 6 on page 16 will be amended from:
• Aim to ensure, where development is in close proximity to rail stations/halts, that provision
is made for good direct, safe access to and from these facilities; to 
• When development is in close proximity to rail stations/halts, where required ensure that
provision is made for good direct, safe access to and from these facilities. 
Bullet point 7 ensures that connections to and from development are required to be in line with the
Getting It Right for Every Child approach. No change to the supplementary guidance is required. 
Page 42 of 148

Page 47

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
• Bullet point 11 states “Development requires to provide electric vehicle charging stations as an
integral part of new development or redevelopment proposals”. This requirement is not a
requirement of Policy I1. It is a requirement of policy I4. Note that this provision in the guidance is
just a replication of text contained in policy I4 and so is not required in the guidance. Therefore, this
provision should be deleted rather than moved to the section dealing with policy I4. 
• Bullet point 12 requires assessment of transport impacts. There is no requirement in policy I1 for such
assessments and therefore this cannot be introduced as a new requirement in the guidance. 
• Bullet point 13 requires an assessment of air quality, there is no such requirement in policy I1 to link
the new requirement to and therefore it should not be contained in the guidance. 
• Bullet point 14 replicates the requirement in policy I1 for a travel plan but provides no further
guidance on scope or content. 
• Bullet point 15 states that “Masterplans, development briefs and proposals for major developments
require to include satisfactory mechanisms or provisions for supporting sustainable transport
objectives along with additional infrastructure, facilities and services required to support the
development.” The place for such a provision is in the policies of the LDP, not in supplementary
guidance and this provision should be deleted. 
Flooding and Drainage
In the opening paragraph the New Guidance states that “All proposals will be considered in line with Policy I3
Flooding and Drainage of the Local Development Plan and the following criteria”. In order for this to be
acceptable the “following criteria” cannot go beyond the provisions of the LDP policy and must only add
further information or detail to that policy. 
• Bullet points 1, 2, 3 replicates text already contained in policy I3. It is therefore considered that there
is no need for this to be in the guidance as it does not add any further detail or clarity to that that is
included in the LDP policy. 
• Bullet point 4 replicates in part the text in policy I3 and should therefore not be included in the
guidance but also adds that development “must be demonstrated that the site can be satisfactorily
drained.” This is not a requirement of policy I3 and it is not considered that this is further detail to
support that policy, rather this is a new provision that should not be made. 
Policy I4 – Renewable and Low Carbon Energy Developments provides the policy link from the local
development plan for the requirement for electric vehicle charging stations to be an integral part of
any new development or redevelopment proposal. The emerging NPF4 states that development
proposals should demonstrate the provision of electric, hydrogen, and other low or zero-emission
vehicle and cycle charging points that are provided in safe and convenient locations.  The criteria in
bullet point 11 will be amended to reflect this: 
Change Page 16, Bullet 11 from 
• Development requires to provide electric vehicle charging stations as an integral part of new
development or redevelopment proposals; to 
• Development should demonstrate the provision of electric, hydrogen, and other low or
zero-emission vehicle and cycle charging points as an integral part of new development or
redevelopment proposals. 
Paragraph 3 of policy I1 Connecting Places provides the hook which further information is provided
in bullet point 12 of the Connecting Places section.  No change is required to the supplementary
guidance.  
Paragraph 1 of Policy ENV5 Air Quality provides the hook which further information is provided in
bullet point 13 of the Connecting Places section as the matter of air quality is related to transport.
Air quality assessments criteria is also outline in page 53 of the supplementary guidance. No change
is required to the supplementary guidance. 
Paragraph 6 of policy I1 Connecting Places states the overarching aim of a travel plan,  the guidance
provided in bullet point 14 provides additional detail and no change to the supplementary guidance
is required. 
Bullet point 15 provides additional detail to policy 11 and I8 which are in line with the emerging
NPF4. This also reflects the infrastructure first approach set out in the local development plan. No
change to the supplementary guidance is required. 
Policy I3 – Flooding and Drainage sets the policy context for the more detailed flooding and drainage
criteria set out in the supplementary guidance.   
Bullet points 1, 2 and 3 are key principles which strengthen the Council’s approach to flooding and
drainage and are important for sustainable flood risk and water management in line with current
Scottish Government and SEPA policy and guidance. They provide further detail to Policy I3 Flooding
and Drainage . No change to the supplementary guidance is required. 
The site being satisfactorily drained is imperative to the implementation of successful sustainable
urban drainage systems and is linked to Policy I3 Flooding and Drainage.  No change is required to
the supplementary guidance. 
Page 43 of 148

Page 48

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022 
• Bullet points 5 and 6 requires that "The capacity of the functional flood plain to store water must not
be reduced" and that "Development must not result in additional discharge of surface water" these
provisions are not clearly linked to the provisions of policy I3 as written. It is the view that these
provisions should have been policy requirements tested through the examination of the LDP not
introduced in supplementary guidance. These provisions should therefore be deleted from the
guidance. 
• Bullet point 7 adds no further detail to policy I3 that requires all development proposals to ensure
"that there will be no unacceptable flood risk associated with the development". This provision
should therefore be deleted from the guidance. 
• For bullet point 8 to be legitimate it must be more clearly linked to the provisions of policy I3. 
• Bullet point 9 is largely covered already by policy I3. The exception is the provision about “not
compromising the potential for future flood management proposals”. This is a new provision and not
directly linked to the LDP policy and it seems unreasonable given that such proposals may not
necessarily be known at the time of application. 
• Bullet point 10 is a new provision not linked to policy I3 and should have been included as a policy
provision tested through the LDP examination rather than being introduced in guidance afterwards.
This is not reasonable, and this provision should be deleted from the guidance. 
• Bullet point 11 is covered in policy I3 so should be deleted from the guidance. 
• Bullet point 12 states that “Land raising will not be accepted unless…” yet policy I3 states that
“Development which involves land raising will be considered in relation to the risk framework set out
in Scottish Planning Policy and SEPAs guideline with effective compensation for any loss of local flood
storage capacity secured on a like for like basis”. This appears to be a change of policy emphasis
between the LDP and the guidance and that is unreasonable and should be deleted. 
• Bullet point 13 is a replication of text already contained in policy I3. It is therefore considered that
there is no need for this to be in the guidance. 
• The New Guidance also states that “Where the risk of flooding is deemed unacceptable, the proposal
will not be permitted.” This is not a provision of policy I3 and it is not considered appropriate to
contain such a statement in the guidance when this is not contained in the LDP policy and should be
deleted. 
Renewable and Low Carbon Energy Developments
The Guidance states that “An increase in the proportion of electricity produced from renewable sources and
the recovery of waste heat will be supported in principle where they are appropriate in terms of the location,
siting and design.” It is considered that this is a statement of policy that should be in the LDP rather than in
supplementary guidance and should be deleted.  The Guidance states that “All proposals will be considered
against Policy I4 Renewable and Low Carbon Energy Developments of the Local Development Plan having
regard to any individual or cumulative significant effects of the development proposal.” This para requires all
proposals to ensure that the provisions of the bullet points are met. In order for this to be acceptable the
bullets listed in the guidance cannot go beyond the provisions of the LDP policy and must only add further
information or detail to that policy. 
Bullet points 5-12 and 14 of page 17 of the supplementary guidance all provide additional guidance
to the implementation of policy I3 and are in line with SEPA’s guidance, current and emerging
Scottish Government policy. No change is required to the supplementary guidance. 
Foul drainage is an important component of sustainable flood risk management, and it is essential
that the supplementary guidance outlines the criteria. No change to the supplementary guidance is
required.   
Policy I3 states that development must not have an adverse impact on existing drainage, increase
the risk of flooding…… as well as stating that all development proposals require to demonstrate that
there is no unacceptable flood risk associated with development. Where a development cannot
demonstrate there is no risk of flooding, considering all of the criteria in the supplementary
guidance, then the outcome of this would inevitably be that the proposal is unacceptable. 
The supplementary guidance section on Renewable and Low Carbon developments sets the policy
context and additional information for  Policy I4 which is in line with current and emerging Scottish
Government policy, guidance and advice. 
Page 44 of 148

Page 49

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022 
• Bullet point 1 reiterates but adds no further detail to provisions in policy I4 therefore it does not need
to be included in the guidance. 
• Bullet points 2, 4, 5 reflect the bullet points set out in policy I4. However, the bullets in the New
Guidance use language such as “no unacceptable adverse”, “no significant unacceptable impact”, “no
unacceptable impacts”, “not lead to an unacceptable impact” and there is no clarity on what such
impacts would be. The guidance therefore adds little to the provisions in policy I4. 
• Bullet point 3 does not reflect a provision in policy I4 and therefore should not be included.
• Bullet point 6 is a repeat of the text in policy I4 therefore should not be included.
• Bullet point 8 requires arrangements for restoration. This is not a requirement of policy I4 therefore
should not be included.
• Bullet point 10 states “Where technically feasible and financially viable, development with a high heat
demand should seek to be co-located with and make use of heat supply sources”. This is not a
requirement of policy I4 therefore should not be included.
• Bullet point 11 replicates the provisions already in policy I4 therefore should not be included.
• Bullet point 12 states “Where suitable, the potential to connect new projects to off-grid areas are
considered”. This provision goes beyond that of policy I4 and there is no justification of further
guidance provided. It is considered that this provision should be removed from the guidance.
• Bullet point 13 requires "The scale of contribution from the development to renewable energy
generation targets and the effect on greenhouse gas and carbon emissions is fully demonstrated."
This is not a requirement of policy I4, It is considered that this provision should be removed from the
guidance. 
• Policy I4 states that “Development should provide electric vehicle charging stations as an integral part
of any new development or redevelopment proposal.” It would have been useful for the Guidance to
have provided more information and detail on what is expected in this respect and what scale and
types of development this will apply to. 
It is considered that bullet point 1 provides additional criteria. No change to the supplementary
guidance is required.   
Accept change.  Bullet Points 2 and 5 will be amended so terminology is the same between bullets 2,
4 and 5. 
Page 18, Bullet point 2 change from
• There will be no unacceptable adverse impact on the natural or historic environment or
water environment within the area; to 
• There will be no significant unacceptable adverse impact on the natural or historic
environment or water environment within the area. 
Page 18, Bullet point 5 change from 
• There will be no unacceptable impacts on the transport network including Glasgow Airport,
additional traffic generation and/or road safety. Proposals must demonstrate that any
additional impacts can be mitigated; to 
• There will be no significant unacceptable impacts on the transport network including
Glasgow Airport, additional traffic generation and/or road safety. Proposals must
demonstrate that any additional impacts can be mitigated. 
Bullet Points 3, 6, 8, 10, 11, 12, and 13 provide additional information on the implementation of
Policy 14 regarding individual and cumulative effects of renewable and low carbon energy
developments.  No change is required to the supplementary guidance. 
Policy I4 – Renewable and Low Carbon Energy Developments provides the policy link from the local
development plan for the requirement for electric vehicle charging stations to be an integral part of
any new development or redevelopment proposal. The emerging NPF4 states that development
proposals should demonstrate the provision of electric, hydrogen, and other low or zero-emission
vehicle and cycle charging points that are provided in safe and convenient locations.  The criteria in
bullet point 11 will be amended to reflect this: 
Change Page 16, Bullet 11 from 
• Development requires to provide electric vehicle charging stations as an integral part of new
development or redevelopment proposals; to
Page 45 of 148

Page 50

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022 
Affordable Housing
The Guidance does provide additional detail and information in order to implement Policy P3 Housing Mix
and Affordable Housing. The New Guidance includes a requirement to engage in early discussions with the
planning authority to establish affordable housing requirement. This is supported. However, the Council
needs to ensure that the affordable housing requirement is provided at the pre application stage to ensure
that developers understand the extent of the affordable housing requirement and the type and level of
contribution that will be expected. Also, it is important that this guidance is clear that, as per the policy,
affordable housing requirements are “up to 25%” which of course sometimes means the requirement could
be zero%. This should be explicitly referred to in the guidance.  The Council need to ensure that they have a
robust evidence base in place which clearly identifies the level of affordable housing that is required in each
housing market sub area in order to inform developers at the earliest opportunity. This has not been the
experience of developers bringing forward housing developments in Renfrewshire. For Policy P3 to be
effective the Council need to establish what levels of affordable housing, up to 25%, is required for each
development site and this needs to be evidenced and justified as a mitigation for the impact of private
housing within that particular housing market sub area in Renfrewshire. 
The Guidance sets out that it is the Council’s preference that affordable housing should be provided first and
foremost on site. The guidance accepts that affordable homes can be built by the developer and sold / let
directly and provides no further guidance on the form or format of those homes. In the circumstance where
the developer is building units for transfer to the Council or an RSL the guidance requires these units to
comply with Scottish Government’s grant funding criteria in terms of their design standards. In the
circumstance where the developer is transferring land to the Council or an RSL the Guidance requires this to
be serviced and free from constraints. These provisions are supported. 
Provisions are made in the New Guidance to guide that process where it may be not possible to provide
affordable housing on site and where off site provision may be acceptable. Have concerns about the
reference to nil value in bullet point 5, it would be sufficient to say at an agreed value as to say nil value may
raise expectations that this is reasonable in every case when it will not be. Whilst in principal it seems this is a
reasonable approach, they have concerns about the practicality of what is set out and on balance feel this is
not a preferred approach that could rarely be deployed. On this basis it is the view the most practical and
realistic course of action if on-site provision is not possible would be the agreement of a commuted sum.   
Whilst the Council will allow commuted sums to be paid in lieu of provision of affordable housing on site
when off site provision is not possible. The Guidance requires that “Any proposal by a developer to address
affordable housing through a commuted sum must be supported by a viability assessment which sets out why
on site provision is not suitable.” This is supported. What is not supported is the potential for the Council to
unilaterally decide that on site provision should not be the preferred option and that rather they require a
commuted sum. This is not reasonable or justifiable if on-site provision is possible or preferable. 
It is accepted that in some instances a commuted sum will be a more suitable option, however, the Guidance
states that this will be determined independently by the District Value. This can take a significant amount of
time and will result in unnecessary delays to a decision being issued and a delay in housing sites coming
forward in the short term.  Suggest that if a District Valuer is to determine the sum, this should be dealt with
at the pre-application stage when discussion takes place on the level and type of contribution required. 
• Development should demonstrate the provision of electric, hydrogen, and other low or
zero-emission vehicle and cycle charging points as an integral part of new development or
redevelopment proposals. 
The Council are preparing a local housing need and demand assessment to help understand local
needs and to strengthen the evidence base in support affordable housing policy.  This will be
available to support the LDP, Supplementary Guidance and the Local Housing Strategy for the
provision of affordable housing in Renfrewshire. 
The 1st paragraph on page 31 will be amended to ensure it reflects the requirements of Policy P3 of
the LDP:
‘Early discussion (pre-application stage) with the planning authority will be required to establish
affordable housing requirements and the most appropriate mix of affordable housing to be provided
on all sites of 50 or more dwellings providing up to 25% of the total site capacity as affordable
homes.’ 
On Page 31, the 1st sentence of the 5th bullet under off site delivery to be amended to read:
• ‘Where the developer is not constructing the affordable housing the site should be
transferred to the Council or a Registered Social Landlord at an agreed value.’ 
As set out in local development plan Policy P3 Housing Mix and Affordable Housing and the
Affordable Housing section of the supplementary guidance, early discussion at pre-application stage
with the planning authority will be required to establish affordable housing requirements and the
most appropriate mix of affordable housing to be provided on all sites of 50 or more dwellings. A
hybrid approach may be considered appropriate during these discussions. 
A range of options to deliver new affordable homes on site will be considered first before the
consideration off-site delivery and a commuted sum. 
The Supplementary Guidance clearly sets out the circumstance when off-site delivery and a
commuted sum may be appropriate and the method for the delivery of affordable homes for each
option. The option of a commuted sum for affordable homes is to deliver the requirements of Policy
P3 providing up to 25 % of the site capacity. 
The guidance on page 32 clearly sets out the role of the District Valuer or a chartered valuation
surveyor in setting the value of the commuted sum. As set out in Page 31 of the guidance early
discussion will be required with the planning authority to determine the affordable housing
requirements. If developers engage at pre-application stage the number of affordable units required
will be agreed early and will form the basis of setting the value of the commuted sum. 
No further changes are required to the guidance on affordable housing to address these comments. 
Page 46 of 148

Page 51

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Would like to see commitment to a standardised approach, the method of determining the commuted sum
should be transparent and this should be appended to the Guidance. The total number of affordable homes
that the commuted sum will be in lieu of will be up to 25% of the total number of proposed new homes on
the site only and this must be justified in terms of need in the local area / HSMA and would also request an
acknowledgment that in some circumstances part on-site and part commuted sum would be an option. 
For the District Valuer to assess the commuted sum the Council first must identify the number and type of
housing units to be provided up to 25%. There should be an element of flexibility built in so that if at pre-
application stage a commuted sum would be more unaffordable than on site provision the developer would
still have the option to provide on-site. Object to the broad areas to which commuted sums paid could be put.
The commuted sum paid must mitigate the impact of the development of additional housing market homes in
the area. To use the monies otherwise would be unlawful. Monies should also be returned to the applicant if
not spent by a specific deadline. 
Greenbelt Development Criteria
Object to 8 of the 12 bullets under the heading of Green Belt Development Criteria as they go substantially
beyond the provisions made in Clydeplan Policy 8, SPP and LDP policy ENV1. 
• Bullets 1-4 are concerned with loss of agricultural land, impacts on wild land, traffic and access and
public water supply. These are not matters related to green belt objectives as set out in the SPP and
should be removed from the guidance.
• Bullet points 5 and 6 are linked to the “protecting and providing access to open space” in the SPP
therefore acceptable.
• Bullet point 7 and 8 are linked to “protecting and enhancing the character, landscape setting and
identity of the settlement” in the SPP and therefore acceptable.
• Bullet points 8-12 of the New Guidance are concerned with landscape proposals including boundary
treatments, the adequacy of services, nature conservation and habitats and the structural soundness
of buildings for conversions. These are not matters related to green belt objectives as set out in the
SPP and should be removed from the guidance. 
Biodiversity 
Assume this section is link to LDP policy ENV2, although does provide more detail than is contained in policy
ENV2.  The Guidance lacks clarity as to what is specifically required as part of a development and the
mitigation measures that would be required. It is also not clear how developments will be assessed against
requirements and therefore, it is difficult for developers to use this guidance to inform development
proposals. Clear guidance needs to be set out as to what is required, when, the extent of the requirement and
how this will be assessed as part of any application to allow developers to ensure this is maximised on site. 
Policy ENV1 Green Belt and the supplementary guidance criteria listed on page 38 set out clearly the
criteria for where residential developments will be considered appropriate where there is a housing
land shortfall which satisfies Policy ENV1 Green Belt and Policy 8 of ClydePlan.   The guidance on
page 37 of the supplementary guidance relates to all development proposals in the greenbelt and
the guidance on page 38 relates to all residential proposals in the greenbelt. This guidance is not
limited to circumstances where there is an identified housing land shortfall and contains
development guidance which is important to protect Renfrewshire’s greenbelt from inappropriate
development. Again in line with current and emerging Scottish Government Policy, the current
policy and guidance framework in both the local development plan and the supplementary guidance
aims to increase the density of Renfrewshire’s existing settlements, promoting local living by limiting
urban expansion and using land around our towns and villages wisely. There is currently no
requirement to identify urban edge sites.   No change to the supplementary guidance is required. 
The biodiversity section on page 40 links to Policy ENV 2 Natural Environment providing more
detailed criteria.  This criteria is in line with the emerging NPF4 that states that proposals for local
development should only be supported if they include appropriate measures to enhance
biodiversity, in proportion to the nature and scale of development. No change is required to  the
supplementary guidance. 
In line with the determination of any planning application, the requirement or not of mitigatory
measures will be dependent on the detailed information submitted alongside an development
proposal. The mitigatory measures are then unique to the site, development and future
requirements, it would not be appropriate to set out a list of universal mitigatory measures. 
12 Homes for Scotland  The Guidance in places appears to go beyond merely supplementing policies within the LDP but looks to
introduce new and more onerous requirements for developments to meet. This is not an appropriate use of
Supplementary Guidance as the principles of policy have not been properly scrutinised or tested as part of the
LDP examination.  Planning Circular 6/2013 (Development Planning) sets out that there has to be a sufficient
hook in the LDP policies to hang Supplementary Guidance. 
Connecting Places 
The public transport provision in the SG is too restrictive when compared with Policy I1 of the LDP. The LDP
promotes development opportunities in localities beside or close to existing public transport networks. 
Policy I1 – Connecting places sets out the policy context for connectivity within Renfrewshire and
provides the necessary hooks for the supplementary guidance. The supplementary guidance is
reflective of the general thrust emerging from draft NPF4.  NPF4 states that development proposals
Page 47 of 148

Page 52

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Whereas the SG is unduly prohibitive of development in providing that “public transport networks should be
accessible within 400 meters walking distances of the development.” This distance will effectively
constrain some allocated and otherwise deliverable sites. This overly prescriptive and restrictive standard
needs to be deleted from the SG. 
The SG requires development layouts to give priority to and allow penetration by buses. This is problematic as
it is not practical for buses to access all housing developments and there is no guarantee that the service will
divert should this provision be made given that it may also undermine the service to existing
passengers. This bullet point is disproportionate and needs to allow greater flexibility depending on the size,
layout, and location of the development. The practicality and viability of introducing such measures into a
development layout must also be given due consideration. 
The SG requires that development should provide electric vehicle charging stations as an integral part of any
new development or redevelopment proposal. This requirement should only relate to non-residential
developments, as residential developments will make their own provision. This is also likely to be a
requirement in the Building Regulations Update so it seems unnecessary to duplicate the provision. 
Flooding 
The guidance replicates part of the text in policy I3 but also adds that it “must be demonstrated that the site
can be satisfactorily drained.” This is not a requirement of policy I3 and it is not considered that this is further
detail to support that policy, rather this is a new provision that should not be made. The guidance requires
that “The capacity of the functional flood plain to store water must not be reduced” and that “Development
must not result in additional discharge of surface water” these provisions are not clearly linked to the
provisions of policy I3. These provisions should have been policy requirements tested through the
examination of the LDP and should therefore be deleted from the guidance. In relation to existing flood
protection mechanisms, it seems unreasonable to introduce the new wording “not compromising the
potential for future flood management proposals”, as that information may not be available at the time of a
planning application. It is unreasonable to introduce the new requirement under bullet point 10 in relation to
engineering works in the water environment and culverting of water courses. This policy was not included in
the LDP and so has not been robustly tested through an examination. The bullet point that refers to land
raising appears to make the policy provision much more onerous for developments than was published in
policy I3 of the LDP. It is not acceptable for the guidance to change the emphasis of the LDP and therefore this
clause should be deleted from the SG. 
should aim to support sustainable travel and transport based around the 20 minute neighbourhood
principal where we are reducing the need to travel unsustainably, decarbonising our transport
system and promoting active travel are key 
The emerging NPF4 states that planning applications for significant travel generating uses should not
be supported at locations which would increase reliance on the private car and where access to local
facilities via public transport networks would involve walking or wheeling more than 400m. Criterion
4 is no different to current policy, guidance or advice set out by the Scottish Government.  No
changes required to criteria. 
Accept this amendment. Bullet point 5 on page 16 will be amended from:
• Ensure provision is made in development layouts giving priority to and allowing penetration
by buses; to 
• Where practical make provision within development layouts giving priority to and allowing
penetration by buses 
Policy I4 – Renewable and Low Carbon Energy Developments provides the policy link from the local
development plan for the requirement for electric vehicle charging stations to be an integral part of
any new development or redevelopment proposal. The emerging NPF4 states that development
proposals should demonstrate the provision of electric, hydrogen, and other low or zero-emission
vehicle and cycle charging points that are provided in safe and convenient locations.  The criteria in
bullet point 11 will be amended to reflect this: 
Change Page 16, Bullet 11 from 
• Development requires to provide electric vehicle charging stations as an integral part of new
development or redevelopment proposals; to 
• Development should demonstrate the provision of electric, hydrogen, and other low or
zero-emission vehicle and cycle charging points as an integral part of new development or
redevelopment proposals. 
Policy I3 – Flooding and Drainage sets the policy context for the more detailed flooding and drainage
criteria set out in the supplementary guidance. The site being satisfactorily drained is imperative to
the implementation of successful sustainable urban drainage systems and is linked to Policy I3
Flooding and Drainage.  The supplementary guidance provides additional guidance to the
implementation of policy I3 and are in line with SEPAs guidance, current and emerging Scottish
Government policy. No change is required to the supplementary guidance. 
Page 48 of 148

Page 53

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Residential Use of Centres 
The test for the re-development of Institutional Premises is far too onerous. If buildings are not listed and not
within a Conservation Area then there is no need for applicants need to go through a test of conversion
before re-development can be considered. 
Affordable Housing 
Early discussion (pre-application stage) with the planning authority on affordable housing requirements is
supported. It is imperative that at pre-application stage the applicant is provided with the affordable housing
requirement in terms of mix and level. The guidance should be explicit that, as per the policy, affordable
housing requirements are up to 25% which can mean the requirement in some instances could
be zero. 
The council needs to have a robust evidence base in place that clearly identifies the level of affordable
housing that is required in each housing market sub area. Homes for Scotland members have not experienced
this when bringing forward previous applications for housing developments. 
In reference to bullet point 5 it is unreasonable for land to be transferred at “nil value”. An appropriate
alternative would be to say at an “agreed value” as nil value will not always be appropriate or practical. It is
stated that the site must be transferred to an RSL or the Council prior to the delivery of any units on the
primary site. It then states that the land must be accessible, serviced and readily developable. It will be for the
Council or an RSL to determine its acceptability. These provisions create too many uncertainties for the
developer of the primary site and all aspects of delivery may not be within their control. It is not clear what
“readily developable” means as this may not be in control of the applicant. 
The provision of a commuted sum in lieu of affordable housing provision in exceptional circumstances is
supported. If on site provision is possible then a commuted sum should not be required or requested by the
council. 
There needs to be early visibility on the scale of any commuted sum. If the District Valuer is to be relied on for
the determination of a commuted sum it should be dealt with at pre-application stage to avoid delay later in
the process. The method of determining the commuted sum should be transparent and be appended
to the Supplementary Guidance. The affordable housing provision should contain flexibility to allow for a
hybrid approach in certain cases with a mix of units on-site combined with an element of commuted sum.
There should be a reference in the SG to comply with PAN 2/2010.  There must be a clear remit for where the
commuted sum is to be paid and this should relate to the implications of the new development and the
mitigation of those impacts. 
The approach set out in the supplementary guidance is to ensure good placemaking in our centres
along with encouraging the application of the concept of 20 minute neighbourhoods. Centres are
sustainable hubs and the range and choice in these centres is important to strength the resilience.
No change to the supplementary guidance is required. 
The Council are preparing a local Housing Needs and Demand Assessment to help understand local
needs and to strengthen the evidence base in support affordable housing policy.  This will be
available to support the LDP, Supplementary Guidance and the Local Housing Strategy for the
provision of affordable housing in Renfrewshire. 
The 1st paragraph on page 31 will be amended to ensure it reflects the requirements of Policy P3 of
the LDP:
‘Early discussion (pre-application stage) with the planning authority will be required to establish
affordable housing requirements and the most appropriate mix of affordable housing to be provided
on all sites of 50 or more dwellings providing up to 25% of the total site capacity as affordable
homes.’ 
On Page 31, the 5th bullet under off site delivery to be amended to read:
• ‘Where the developer is not constructing the affordable housing the site should be
transferred to the Council or a Registered Social Landlord at an agreed value. The site must
be transferred to the Registered Social Landlord or the Council prior to the delivery of any
units on the primary site. Only that portion of the site necessary to effectively deliver the
contribution need be transferred. The transferred land must be deliverable and free from
constraints. It will be for the Council or an Registered Social Landlord to determine its
acceptability’ 
As set out in LDP Policy P3 Housing Mix and Affordable Housing and the Affordable Housing section
of the Supplementary Guidance early discussion at pre-application stage with the planning authority
will be required to establish affordable housing requirements and the most appropriate mix of
affordable housing to be provided on all sites of 50 or more dwellings. A hybrid approach may be
considered appropriate during these discussions. 
A range of options to deliver new affordable homes on site will be considered first before the
consideration off-site delivery and a commuted sum. 
The Supplementary Guidance clearly sets out the circumstance when off-site delivery and a
commuted sum may be appropriate and the method for the delivery of affordable homes for each
option. The option of a commuted sum for affordable homes is to deliver the requirements of Policy
P3 providing up to 25 % of the site capacity. 
The guidance on page 32 clearly sets out the role of the District Valuer or a chartered valuation
surveyor in setting the value of the commuted sum. As set out in Page 31 of the guidance early
discussion will be required with the planning authority to determine the affordable housing
requirements. If developers engage at pre-application stage the number of affordable units required
will be agreed early and will form the basis of setting the value of the commuted sum. 
No further changes to the guidance on affordable housing are required. 
Page 49 of 148

Page 54

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Housing in the Green Belt 
The Supplementary Guidance relating to housing in the greenbelt is more onerous than the Renfrewshire
Local Development Plan. Specifically, in a shortfall in housing land supply, there should be alignment with the
LDP, and the release policy contained in Policy 8 of Clydeplan. However, the SG is too restrictive by way of
establishing more criteria for development within the Green Belt. The cumulative impact is the efficacy of the
release policy is reduced. The SG should be supplementing the LDP as opposed to fundamentally rewriting
policy. Homes for Scotland object to the Green Belt section contained within the SG. This will be particularly
onerous to the delivery of homes in Renfrewshire given the shortage of brownfield sites. 
Biodiversity
The Guidance lacks clarity around the extent to which mitigatory or offsetting measures should be
implemented, there is no specific metric to be used and it is unclear how local authority planners will assess
applications. The Guidance should be looking to support the LDP and not rewrite the policy. 
Noise 
The measures provided will be harder to mitigate against given the associated noise around brownfield sites.
This will be particularly problematic given the predominant use of these sites moving forward and previous
requirements by Environmental Health to consider noise in some scenarios with windows open. This provision
should be compliant with PAN 1/2011. 
Policy ENV1 Green Belt and the supplementary guidance criteria listed on page 38 set out clearly the
criteria for where residential developments will be considered appropriate where there is a housing
land shortfall which satisfies Policy ENV1 Green Belt and Policy 8 of ClydePlan.   The guidance on
page 37 of the supplementary guidance relates to all development proposals in the greenbelt and
the guidance on page 38 relates to all residential proposals in the greenbelt. This guidance is not
limited to circumstances where there is an identified housing land shortfall and contains
development guidance which is important to protect Renfrewshire’s greenbelt from inappropriate
development. Again in line with current and emerging Scottish Government Policy, the current
policy and guidance framework in both the local development plan and the supplementary guidance
aims to increase the density of Renfrewshire’s existing settlements, promoting local living by limiting
urban expansion and using land around our towns and villages wisely. There is currently no
requirement to identify urban edge sites.   No change to the supplementary guidance is required. 
The biodiversity section on page 40 links to Policy ENV 2 Natural Environment providing more
detailed criteria.  This criteria is in line with the emerging NPF4 that states that proposals for local
development should only be supported if they include appropriate measures to enhance
biodiversity, in proportion to the nature and scale of development. No change is required to  the
supplementary guidance. 
In line with the determination of any planning application, the requirement or not of mitigatory
measures will be dependent on the detailed information submitted alongside an development
proposal. The mitigatory measures are then unique to the site, development and future
requirements, it would not be appropriate to set out a list of universal mitigatory measures.
Page 53 of the Local Development Plan sets out the structure and content of a Noise Assessment.
Page 46 Noise provides further information. An additional sentence will be added to the 3rd
paragraph that states:
• The production of a noise assessment will be complainant with Planning Advice Note
1/2011: planning and noise. 
13 Scottish Water  Scottish Water is committed to working with Renfrewshire council to help deliver new development within
the area and have already been working closely together in the City Deal projects which have featured in the
guidance and will continue to provide help and support in ensuring their delivery. Scottish Water would ask
then when the developments for the other sites are known, then contact should be made in the first instance
to fully understand the water and waste water demands on the system and to
highlight any areas where further studies and mitigation may be required. 
Noted 
14 Scottish
Government,
including Transport
Scotland 
Transport Assessment 
Page 49 - A transport assessment requires to be carried out to quantify the traffic and transport implications
arising from intensification of use, change of use or new developments that require planning permission.
It can also help prioritise measures which reduce the need to travel, promoting more sustainable patterns of
development, reducing car use and encouraging walking, cycling and use of public transport. 
An early indication of the scale of any potential transport impact arising from a proposed development will
influence the level and type of assessment required. The scope of the assessment should be discussed early in
the process with the Council and where required Transport Scotland. A Transport Assessment must consider:
• Existing infrastructure and characteristics of the site and its surroundings;
• Baseline transport data;
• Travel characteristics including pedestrian and cyclist information; 
Accept proposed changes, the bullet points on page 49 will be amended to reflect this list:
• Existing infrastructure and characteristics of the site and its surroundings;
• Baseline transport data;
• Travel characteristics including pedestrian and cyclist information;
• Existing public transport provision;
• The road network surrounding the site;
• Impacts from any committed developments;
• Description of the proposed development, including parking provision
• Estimates of person and vehicle trip generation for the proposed development;
• Proposed access arrangements for walking, cycling, public transport and vehicles;
• Proposed transport improvements or potential transport interventions;
Page 50 of 148

Page 55

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
• Existing public transport provision;
• The road network surrounding the site;
• Impacts from any committed developments;
• Description of the proposed development, including parking provision
• Estimates of person and vehicle trip generation for the proposed development;
• Proposed access arrangements for walking, cycling, public transport and vehicles;
• Proposed transport improvements or potential transport interventions;
• How the location, layout and design of the development will influence the choice of travel mode,
potentially through preparation of a Travel Plan;
• The transport implications of freight or service operations;
• Likely content of any planning obligation (Section 75 Agreement); and
• Road safety, and the need for a road safety audit. 
Parking 
Page 16 - Reference to vehicle parking on p16 states that ‘The provision of parking for vehicles… is made in
accordance with national standards’ and p15 states that in respect of hot food takeaways, ‘suitable parking
and servicing arrangements must be provided to serve the proposed use.’  Consider that these references
could be amended to better reflect emerging policy in draft NPF4 which does not include national standards
and encourages low levels of parking in suitable locations. The provision of parking should be considered
locally, in line with national guidance. With regards to hot food takeaway, there may be locations where
parking is not required, requiring suitable access, especially by sustainable modes, in more in line with the
direction of travel of national policy. 
Freight 
Page 6 – Refers to Burnbrae, Linwood and the potential to develop an Intermodal terminal providing
sustainable road/rail freight transfers, with opportunities to remove goods vehicles from the road network. 
Consideration could also be given to how other important freight sites e.g. HIllington / Renfrew could be
made more sustainable and support the decarbonisation of freight. 
Airports 
Page 7 - States that there is an ‘Opportunity to enhance access to Glasgow Airport’ Further, there is support
for uses such as car parking and storage and distribution.  This should say access by sustainable modes in
order to better reflect transport policy ambitions in NPF4 and NTS2. Also suggest compatible uses also include
transport links by sustainable modes. 
Vacant and Derelict Land 
Whilst there is evidence that the draft supplementary guidance references a requirement to consider the re-
use or re-development of brownfield land before new development takes place on greenfield sites we suggest
a stronger position could be adopted given the strengthened policy position on vacant and derelict land and
buildings in the current draft NPF4. 
• How the location, layout and design of the development will influence the choice of travel
mode, potentially through preparation of a Travel Plan;
• The transport implications of freight or service operations;
• Likely content of any planning obligation (Section 75 Agreement); and
• Road safety, and the need for a road safety audit 
Accept Change 
Bullet point 6 on page 15 will be amended from:
• Suitable parking and servicing arrangements must be provided to serve the proposed use;
to
• Where required, suitable parking and servicing arrangements must be provided to serve the
proposed use. 
Bullet point 9 on page 16 will be amended from:
• The provision of parking for vehicles, including disabled parking and parking for cycles and
motorcycles, is made in accordance with national standards; to
• Development proposals should consider the need to supply safe and convenient cycle
parking, and where appropriate  motorcycles, visitor parking and  disabled parking with
consideration given to the type, mix and use of development, car ownership levels, the
surrounding uses and the accessibility of the development by sustainable modes when
considering parking provision for other vehicles. 
Accept Change Page 6 Hillington/ Renfrew North – Challenges / Opportunities add new line after 2nd
paragraph: 
Opportunity to consider more sustainable modes of transport and the decarbonisation of freight. 
Accept Change Page 7 Area to the north of Paisley Town Centre – Challenges/ Opportunities.
Sentence will be amended from:
• Opportunity to enhance access to Glasgow Airport and the Advanced Manufacturing and
Innovation District Scotland; to 
• Opportunity to enhance access to Glasgow Airport and the Advanced Manufacturing and
Innovation District Scotland through sustainable modes of travel and transport. 
The overarching nature of this is reflected in the implementation of the spatial strategy as well as
the policies and proposals of the local development plan as well as throughout the guidance and
advice of the supplementary guidance . No change to the supplementary guidance.
Page 51 of 148

Page 56

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
15 Mr Kerry
Mackendrick 
Page 42 – Regional Parks 
Add an additional bullet point 
• It complies with the Policies in the NPF4 issued by the Scottish Government 
The proposed development at Burnfoot Road appears contrary to NPF4 policies as it is on green belt land,
within Clyde Muirsheil Regional Pak, on land that has been in productive agricultural use for the past 4 years
and in a designated flood risk area. 
Page 46 – The Water Environment 
Add an additional bullet point
• Assessment is required of existing surface water and foul drainage systems to water treatment plants,
where large scale new housing or commercial development is proposed, regarding the potential
hazard to public health from flooding discharges into river and inland loch waterways, and increased
future risk predicted due to climate change. 
The local development plan and new development supplementary guidance are written within a
policy hierarchy and reflect the aspirations of national polices.  No change to the supplementary
guidance is required.   
16 SEPA It is our understanding that the supplementary guidance provides additional information in respect of
policies, set out in the local development plan, which specify which matters are to be dealt with in
supplementary guidance. 
Flooding and Drainage
It may be sensible to consider updating the guidance when NPF4 is enacted and stating this revision as a
future action. 
SEPA has no issues with the flood risk criteria set out in the supplementary guidance and welcomes the
further references to a precautionary approach and avoidance, being included in the first two criteria. 
We believe that the supplementary guidance may be further enhanced if the following points are included. 
• A specific reference to climate change (CC) and design standards for flood risk and land use planning
decisions and Renfrewshire’s Drainage Impact Assessment guidance.  SEPA recommend a CC allowance for all
development.  Renfrewshire Council declared a CC emergency in 2019 and may wish therefore to consider if
an allowance for CC for new developments should be a requirement. You may wish to consider requiring new
development either avoids the 200yr plus CC floodplain (as proposed in the draft NPF4) or include it within
the setting of Finished Floor Levels (FFL) (200yr plus CC plus freeboard).     
• Reference to SEPA’s vulnerability guidance would be helpful in understanding the context of
development proposals and flood risk expectations. 
• It is entirely possible that development protected by a Flood Protection Scheme will be proposed. We
would therefore recommend a reference to SEPA’s Planning Information Note 4 (PIN4) which outlines our
position relating to proposed development protected by a Flood Protection Scheme. The position is
embedded in SEPA’s Flood Risk Planning Guidance and reflects our interpretation of Scottish Planning Policy
2014 (SPP) and our duties under the Flood Risk Management (Scotland) Act 2009. 
• SEPA require safe pedestrian access/egress in the event of flooding. Renfrewshire Council may wish
to consider also including a requirement for safe vehicular access/egress. 
Air Quality
SEPA welcomes the  Council's position that an air quality assessment will be required close or adjacent an Air
Quality Management Areas(AQMA). There have been no exceedences within the 3 AQMAs (Paisley, 
One NPF4 is adopted it will form part of the Development Plan for Renfrewshire and will provide the
most up to date policy position in the assessment of planning applications. No change to the
supplementary guidance is required 
Noted. 
Accepted: 
Page 17 – Flooding and Drainage, bullet 1 will be amended to read, ‘Development proposals require
to adopt a precautionary approach to the reduction of flood risk from all sources and comply with
the principles of sustainable flood risk management and strengthen resilience to the current and
future impacts of climate change in line with Scottish Government policy.’ Page 51 of the guidance
sets out the requirements of a Flood Risk Assessment, bullet 1 will be amended to read ‘ Identifying
and quantifying the source of flooding taking into account the effects of climate change’. 
Policy I3 and the associated guidance in the supplementary guidance is clear that national policy and
SEPA’s guidance on flood risk and drainage requires to be considered when preparing development
proposals. There is no need to repeat this guidance in the supplementary guidance. No amendments
are required. 
An additional bullet point will be added to page 17 – Flooding and Drainage which will read, ‘It has
been demonstrated that a safe operation and access/egress can be achieved during the design flood
event.’ 
Page 52 of 148

Page 57

APPENDIX 1 – New Development Supplementary Guidance Consultation Replies 2022
Johnstone and Renfrew) for several years so by rights they could be revoked. However, their annual progress
report has highlighted several major developments which may impact on air quality in the future and the
supplementary guidance should enable the mitigation of any potential air quality impacts. 
Renewable and Low Carbon Energy Developments proposals
Planning is instrumental in securing both passive and active energy efficiency measures within development
by supporting appropriate development densities in the right places, ensuring building and development
layouts maximise solar gain, and securing planting and other means for natural cooling. The SG should include
efficiency requirements to ensure that the policy requirements can be delivered in practice. 
The SG provides a useful overview of the land use planning policy context of renewable and low carbon
energy development within the council boundary, noting the constraints for wind development because of
Glasgow Airport. The document provides clear guidance on the requirements to which planning applications
for renewable and low carbon energy developments must adhere. The following comments provide
additional information to further support the objectives of the document. 
There are no references to Local Heat and Energy Efficiency Strategies (LHEES) within the document. The
implementation of LHEES has yet to commence and this complicates the integration of strategies which
contain spatial information and policy guidance relating to development opportunities for Renewable and
Low Carbon Energy. However as outlined in the Heat in Buildings Strategy (October 2021), LHEES documents
will provide a framework for taking an area-based approach to heat and energy efficiency planning and
delivery, and their development processes will provide an important platform to consider both local
community and wider national infrastructure issues. It is therefore important that the SG is cognisant of
LHEES and potential opportunities for identifying and delivering appropriate energy generation proposals and
that meaningful policy levers are embedded within the document as far the council sees fit. 
SEPA currently, in line with the Thermal Treatment of Waste Guidelines 2014, requires a Heat and Power Plan
to be submitted with any planning application for an energy from waste facility. You may wish therefore to
include a reference to the requirement for Heat and Power plan submissions. 
We recommend the inclusion of a requirement for applications for renewable or low carbon energy
developments to include proposals for energy storage on site wherever possible. 
Under the heading of Tourism, is a requirement for development proposals to include the incorporation of a
design which promotes energy efficiency and the use of low carbon generating technologies. We support this
requirement and would request that it is extended to all development types to reduce energy consumption as
far as possible within new development proposals. 
Page 47 of the supplementary guidance is clear that ‘any potential significant impact on local air
quality from development within or adjacent to the existing air quality management areas will
require to be mitigated.’ No change required. 
Policy I7 Zero and Low Carbon Buildings of the local development plan and associated guidance in
the supplementary guidance provides a policy framework to support this. In addition,
Renfrewshire’s Places Design Guidance provides design advice in relation to delivery of sustainable
development. No amendments to the supplementary guidance are required. 
The local development plan and associated guidance in the supplementary guidance provides a
policy framework to support the preparation of Local Heat and Energy Efficiency Strategies (LHEES)
as they emerge. No change to the supplementary guidance is required. 
Page 18 of the supplementary guidance requires SEPA’s Thermal Treatment of Waste Guidelines
must be followed where development involves recovering energy from waste. It is not necessary to
repeat the requirement of this guidance. 
New bullet added to Page 18 to read ‘development proposals for renewable or low carbon energy
developments to include proposals for energy storage on site wherever possible’. 
Policy I7 Zero and Low Carbon Buildings of the local development plan addresses this. No
amendments to the supplementary guidance are required. 
Page 53 of 148

Page 58

Page 54 of 148

Page 59

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: A Guide to Development in Conservation Areas 2022
___________________________________________________________________ 
1. Summary 
1.1 This report presents the Guide to Development in Conservation Areas 2022.  The
guide supports the Local Development Plan 2021 and the New Development
Supplementary Guidance providing advice on new development proposals or
work to a property within a conservation area.   
1.2 A copy of the Guide to Development in Conservation Areas can be found here.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve the publication of the Guide to Development in Conservation Areas
2022. 
___________________________________________________________________ 
3. Background 
3.1 There are 8 conservation areas within Renfrewshire which require to be
safeguarded and enhanced due to their architectural or historic interest. The
guide aims to ensure that any new development and/or alterations/works
preserves and enhances the character and appearance of conservation areas. 
3.2 The guide supports the Local Development Plan 2021 and sets out the different
types of consent that may be required when undertaking development within a
conservation area. 
Item 6
PACC140622 Page 55 of 148

Page 60

It also outlines general advice for new development proposals and/or works as
well as setting out overarching conservation area principles. 
3.3 The guide puts a spotlight on the following areas:
• New build;
• Demolition;
• Extensions;
• Doors & porches;
• Windows;
• Dormers & rooflights;
• Roofs & chimneys;
• Garages;
• Satellite dishes;
• Boundaries, gardens, drives;
• Trees;
• Shopfronts. 
3.4 The principle messaging in the guide is for preservation and re-use and where
there are alterations, additions or changes then these must be sympathetic to
the character and appearance of the conservation area. 
4.  Next Steps
4.1 Following approval by the Board, the  Guide to Development in Conservation
Areas 2022 will be available online at the Council’s webpages. 
4.2 The design advice will become a material consideration in the assessment of
new development proposals and works in a conservation area.
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal - None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. 
Page 56 of 148

Page 61

No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – None.
___________________________________________________________________ 
Appendix 1 – A Guide to Development in Conservation Areas 2022
___________________________________________________________________ 
Author:  Sharon Marklow, Place Strategy Manager
Tel: 0141 618 7835; email: Sharon.marklow@renfrewshire.gov.uk 
Page 57 of 148

Page 62

Page 58 of 148

Page 63

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading:  Planning Enforcement Charter 2022
___________________________________________________________________ 
1. Summary 
1.1 This report presents the updated Renfrewshire Planning Enforcement
Charter. 
1.2 The Town and Country Planning (Scotland) Act 1997 (as amended) requires
the planning enforcement charter to be reviewed every two years. 
1.3 The planning enforcement charter sets out the process and procedures for
how and when planning will deal with a breach of planning control.  
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
(i) Approve the Renfrewshire Planning Enforcement Charter 2022 which can
be found here. 
___________________________________________________________________ 
3. Background 
3.1. The Renfrewshire Planning Enforcement Charter sets out the process and
procedures for how and when the Council will deal with a breach of planning
control. It provides information and advice as to how a suspected breach of
planning control can be brought to the attention of Renfrewshire Council.   
3.2. Service standards and timescales are highlighted in the charter with a
commitment to dealing with breaches of planning control through prioritisation
of action depending on the seriousness of the breaches of planning control.   
Item 7
PACC140622 Page 59 of 148

Page 64

4. Planning Enforcement Charter 2022 
4.1. The revised Planning Enforcement Charter outlines the role of the Council the
applicable policies and procedures and the standards of service to be
expected. 
4.2. The charter notes that the purpose of planning enforcement is to find a
solution or to deal with the issue rather than seek to punish. 
4.3. It should be noted that planning enforcement is a discretionary power for local
authorities and each case is considered in terms of the nature of the planning
breach and the wider public interest.   
4.4. The Enforcement Charter outlines that following issues will be prioritised: 
 Significant detrimental impact on public safety;  
 Irreversible damage to listed buildings; 
 Significant detrimental impact on amenity; 
 Impact on trees protected by Tree Preservation Orders/in Conservation
Areas. 
5. Next Steps 
5.1. If approved, the updated planning enforcement charter will replace the current
enforcement charter.   
5.2. The Council’s Planning Team will continue to keep the effectiveness of the
enforcement charter under review and future updates will be presented to
Board when required. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
The Charter assist in promoting Renfrewshire as a place to live, work and visit. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None.
Page 60 of 148

Page 65

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – The proposed site development briefs seek to ensure that any
development coming forward is undertaken in a sustainable manner and aids
the adaption required as a result of climate change.
___________________________________________________________________ 
Appendix 1 – Renfrewshire Planning Enforcement Charter 2022. 
___________________________________________________________________ 
Author: David Love, Chief Planning Officer
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk 
Page 61 of 148

Page 66

Page 62 of 148

Page 67

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Developer Contributions
___________________________________________________________________ 
1. Summary 
1.1 At the meeting of the Communities, Housing and Planning Policy Board on 17th
August 2021 it was agreed that officers would undertake further investigations in
respect of developer contributions received in relation to Section 50, Section 69
and Section 75 agreements. 
1.2 This report provides an update on the investigations undertaken to date and status
of the monies currently held by the Council.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
 Note that a separate paper will consider the funds held in respect of the
development known as Station Rise, Lochwinnoch.
 Note that £100,000 is held in respect of improved road transportation links at
Braehead.
 Note that £40,000 is held in respect of a pedestrian crossing at Abbotsinch
Retail Park;
 Note that £50,000 is held in respect of artwork at Ferry Village; 
 Note that further investigation is required in respect of monies held in respect
of contributions to Fastlink and the art fund at Ferry Village; and
 Note that an annual report will be brought to the Planning and Climate Change
Policy Board in August which outlines the funds held and their purpose in
respect of all current S69 or S75 legal agreements associated with planning
permissions in Renfrewshire.
_________________________________________________________ 
Item 8
PACC140622 Page 63 of 148

Page 68

3. Background 
3.1  At the meeting of Council on 13 May 2021, a motion was carried which instructed
Officers to expedite confirmation of the legal status of monies received in respect
of a Section 50 agreement.  The Section 50 agreement in question relates to a
planning application which was approved at Station Rise, Lochwinnoch. 
3.2 In addition, Council also requested that a Report be prepared in respect of other
monies which the Council have received in respect of other such agreements
relating to planning applications. 
3.3 At the meeting of the Communities, Housing and Planning Policy Board on 17th
August 2021, a report was presented which detailed monies currently held by the
Council, however it explained that further investigation was required in respect of
some of the monies involved to clarify the status and purpose of the funds
concerned.   
4. Monies Held 
4.1 Officers have sought to investigate the monies which are currently held by the
Council and the details are noted below. 
Section 50, Station Rise, Lochwinnoch 
4.2 As noted above, £44,000 is currently held in respect of the Section 50 agreement
which relates to planning application 90/0661/PP, known as the Station Rise
development. 
4.3 The consideration and allocation of the £44,000 is subject to a separate paper to
be considered by the Communities, Housing and Planning Policy Board.   
S69 Renfrew – Kings Inch Road/Ferry Road/Meadowside Street/Neil Street,
Renfrew 
4.4 Planning application 02/0660/PP relates to the erection of residential
development with ancillary retail and restaurants (in principle) at Kings Inch
Road/Ferry Road/Meadowside Street/Neil Street, Renfrew. 
4.5 As previously reported, a legal agreement relating to the development included
an obligation for the applicant to contribute towards rail halts and similar transport
related infrastructure.  As a result of uncertainty over the timing, routing and
funding of such infrastructure, the infrastructure in question has never come
forward. 
4.6 The obligation was discharged following payment of the sum of £100,000 to
Renfrewshire Council and the variation of the associated legal agreement. 
4.7 The varied legal agreement noted the payment of £100,000 as an infrastructure
contribution to facilitate and improve road transportation links to the development. 
Page 64 of 148

Page 69

4.8 To date this money is held by the Council.  There are no restrictions in terms of
when this money requires to be expended. 
4.9 Environment and Infrastructure have been made aware of the monies to ensure
a suitable project(s) comes forward. Details of the proposal to utilise these
monies will be brought back to the relevant Board in due course. 
Fastlink Contributions 
4.10 Various planning applications have related to developments at King Inch Road,
and Ferry Village, Renfrew with a number of applications agreeing to a financial
contribution towards the bus rapid transit system known as Fastlink. 
4.11 The contributions in question were secured via S69 or S75 legal agreements 
4.12 As previously reported £26,000 has been received in respect of Fastlink in
connection with various planning applications at King Inch Road, and Ferry
Village, Renfrew. 
4.13 It should be noted that the Proposed Local Development Plan no longer requires
planning applications to contribute to Fastlink as the proposal is no longer being
progressed.   
4.14 Following the Developer Contributions Report which was considered at the
Communities, Housing and Planning Policy Board in August 2021, further
investigation have been undertaken in order to identify applicants, understand
the terms of the agreements in question and confirm the legal status of the
monies received. 
4.15 The further investigations undertaken have not yet been concluded and, in this
regard, it is proposed that the ongoing investigations continue to clarify matters
in respect of the monies received.  It is hoped that we will be able to provide an
update at the next meeting of the Communities, Housing and Planning Policy
Board. 
S69 Abbotsinch Retail Park 
4.16 A Section 69 agreement secured funds of £40,000 in respect of a planning
application at Abbotsinch Retail Park. 
4.17 Upon further investigation, it has been confirmed that the £40,000 was received
in respect of planning application 16/0878/PP which concerned the erection of
non-food retail warehouse with associated car parking and servicing
(Amendment to Planning Consent 16/0355/PP to include a free-standing
building, amended floorspace layout and alterations to external parking and
servicing layout) at Abbotsinch Retail Park.    
Page 65 of 148

Page 70

4.18 The funds received relate to a sustainable transport contribution and more
specifically require to be used towards the installation of a pedestrian crossing
on Renfrew Road so as to facilitate pedestrian access to the application site from
the bus stop on Renfrew Road. 
4.19 The Section 69 agreement requires that the funds in question are returned
should they not be expended 10 years after their receipt.  The funds in question
therefore require to be spent by 1st June 2027. 
4.20 In light of the above, planning officers will now liaise with colleagues in
Environment and Infrastructure in order to progress the spend of the
contribution in line with the terms of the agreement.   
S75 Ferry Village, Renfrew 
4.21 A Section 75 agreement in connection with the Ferry Village development
provided £292,250 in respect of upgrades to local primary schools and an art
fund. 
4.22 The upgrades to the respective schools have been completed leaving £50,000
remaining unspent. 
4.23 The unspent £50,000 relates to an art fund and this money is currently held by
the Council. 
4.24 We are currently seeking further advice in relation to the funds held however it
is the intention to liaise with colleagues in Marketing and Communications with
a view to commissioning a piece of artwork following a public competition which
could be sited in or around Ferry Village. 
5. Future Monitoring 
5.1 In order to keep members updated on the developer contributions held by
Renfrewshire Council, as previously agreed, an annual report on such matters
be brought to the Planning and Climate Change Policy Board. 
5.2 The proposed report will outline the monies received that year, funds held and
the purposes of the funds. 
5.3 It is intended that the next annual report will be considered at the August 2022
meeting of the Planning and Climate Change Policy Board. 
6. Conclusion 
6.1 Funds are currently held by Renfrewshire Council in respect of the following
developments: 
 £100,000 in respect of improved road links to Braehead Shopping Centre;
 £40,000 in respect of a pedestrian crossing at Abbotsinch Retail Park;
 £50,000 in respect of an art fund at Ferry Village; and 
Page 66 of 148

Page 71

 £26,000 in respect of various developments contributing towards Fastlink. 
6.2 Further investigation requires to be undertaken in respect of the monies held in
respect of Fastlink contributions (£26,000) and the art fund at Ferry Village
(£50,000).  A further report will be brought to Communities, Housing and Planning
Policy Board to provide clarification on the position of the funds in question. 
6.3 An annual report will be brought to the Planning and Climate Change Policy
Board which outlines the funds held with Renfrewshire Council in respect of
planning obligations and their purpose.
___________________________________________________________________ 
Implications of the Report 
1. Financial – monies should be released to the appropriate service as required to
meet the obligations set out in the associated legal agreement or returned to the
applicant where applicable.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal – the obligation as stated in respective Section 50 agreement relating to
planning application (90/0661/PP) will be required to be discharged. 
In addition, obligations relating to other legal agreements will also require to be
discharged or varied where monies have been spent, returned or agreement is
reached to repurpose the funds.   
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None. 
13. Climate Risk – N/A.
Page 67 of 148

Page 72

___________________________________________________________________ 
Author:           David Love, Chief Planning Officer. 
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk   
Page 68 of 148

Page 73

___________________________________________________________________
To: Planning and Climate Change Policy Board
On: 14 June 2022
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Lochwinnoch – Station Rise Developer Contribution
___________________________________________________________________ 
1. Summary 
1.1 In August 2021 members considered a report confirming that there exists
£44,000 in an unallocated financial contribution relating to a housing
development in Lochwinnoch dating from the 1990s. 
1.2 Following consultation with the Community Council and local groups this report
recommends a suggested approach to the allocation of this outstanding funds. 
2.  Recommendations 
2.1 It is recommended that the Board: 
(i) Notes Lochwinnoch Community Council’s involvement in co-ordinating the
local community’s input to this exercise and their suggested distribution of
the available funding; 
(ii) Approves the proposed use of the funding; 
(iii) Agrees to transfer the funds outlined to the groups and organisations
itemised in Appendix 1 of this report; 
___________________________________________________________________  
Item 9
PACC140622 Page 69 of 148

Page 74

3. Background 
3.1 Planning application 90/0661/PP concerned the erection of a residential
development (in outline) at land at Church Street/Lochlip Road, Lochwinnoch
and was granted planning consent subject to conditions and a Section 50 legal
agreement on 24 February 1992. The new housing development took on the
street name “Station Rise”. 
3.2 The Section 50 agreement resulted in Renfrew District Council (the then local
authority) receiving a payment of £40,000 in respect of providing a suitable
industrial site within Lochwinnoch.  It is however noted that the £40,000 was
never utilised. It is assumed that industrial land was delivered elsewhere in
Lochwinnoch by another party in respect of a separate obligation. 
3.3 In this regard Renfrewshire Council currently now holds £44,000 in this regard
(with accrued interest). 
3.4 The local community requested that the monies are reallocated to other projects
that benefit the local community. 
4. Funding Proposals 
4.1 Following an extensive period of consultation, whereby the Community Council
invited applications from local groups for project funding, deliberated upon them
in a public meeting, and then met to arrive at conclusions.  Attached at Appendix
1 to this report is the Community Council’s recommendations. 
4.2 The Community Council have applied a degree of judgement against the
applications received and a number of groups have not been supported to the
level they wished to be in their applications.  All groups involved have confirmed
to the Community Council that they believe the process followed was
transparent and fair. 
4.3 All of the groups / organisations listed are constituted and have their own bank
accounts. 
4.4 Ogilvie Homes (as the original contributor of the funding) have been consulted
on the proposed projects to be funded and they are happy for the Council to
proceed on this basis. 
5. Next Steps 
5.1 If Board approve the recommendations contained in the report, arrangements
will be made with the groups / organisations listed for the transfer of the funds
outlined in Appendix 1 to this report. 
_________________________________________________________________ 
Implications of the Report 
1. Financial – None. The £44,000 outlined in the report is already held in a Council
account for this purpose. 
2. HR & Organisational Development – None.
Page 70 of 148

Page 75

3. Community/Council Planning – Opportunity being offered to community council
to co-ordinate distribution of available funding to local groups and organisations. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable. 
___________________________________________________________________
List of Background Papers
None. 
___________________________________________________________________ 
Author:  Alasdair Morrison; Head of Economy and Development; 
Tel: 07979700472
Email:    Alasdair.morrison@renfrewshire.gov.uk 
Page 71 of 148

Page 76

Ogilvie Homes Developer Fund
Lochwinnoch Community Council Recommendations 
GROUP      PROJECT/EQUIPMENT     FUNDING RECOMMENDED
Lochwinnoch Primary School Parent Council  Art boards for playground     £108
Lochwinnoch Primary School Parent Council  P1/2 outdoor chalk boards     £132
Lochwinnoch Primary School Parent Council  Decathlon sports equipment     £350
Lochwinnoch Primary School Parent Council  P1/2 outdoor storage facilities    £719
Lochwinnoch Primary School Parent Council  Embankment slide      £3680
Lochwinnoch Primary School Parent Council  Waterproofs school set     £1361            
Group Subtotal £6350 
Dementia Friendly Group    Film licence purchases     £200
Dementia Friendly Group    Coach hire       £225            
Group Subtotal £425 
Lochwinnoch Community Development Trust Annexe mural       £2000
Lochwinnoch Community Development Trust Samba band instrument purchase    £472
Lochwinnoch Community Development Trust Defibrillators purchase and installation   £4980            
Group Subtotal £7452 
Lochwinnoch Youth Project    I.T. suite hardware      £687
Lochwinnoch Youth Project    Camping equipment      £2896
Lochwinnoch Youth Project    Water sports equipment     £1334            
Group Subtotal £4917 
Lochwinnoch Community Garden   Raised beds, containers, soil, fertiliser   £1800
Lochwinnoch Community Garden   Plants and seeds      £400            
Group Subtotal £2200
Page 72 of 148

Page 77

Lochwinnoch Gala Day    Electrical generators, gazebos    £5500
Lochwinnoch Toddlers Group    Toddlers ‘Play Palace’      £4212
Lochwinnoch Bowling Club    Bowling green upgrades/repairs    £8000
Community Larder/Lochwinnoch Primary School Cooking equipment      £2000
Lochwinnoch Arts Festival    Mobile stage lighting      £500
Lochwinnoch Welcomes    Local guide book design/printing    £1600
Lochwinnoch Force For Nature   Swift boxes       £844 
TOTAL £44,000           
Page 73 of 148

Page 78

Page 74 of 148

Page 79

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading: Site Development Briefs – West of Barochan Road, Houston
___________________________________________________________________ 
1. Summary 
1.1 A site development brief has been prepared for the site at West of Barochan
Road in Houston, a recently allocated residential site within the Renfrewshire
Local Development Plan (2021). 
1.2 The site development brief identifies a number of factors that require to be
addressed in preparing development proposals for these sites. 
1.3 A copy of the site development brief is attached at Appendix 1.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve the site development brief relating to the site at West of Barochan
Road, Houston. 
___________________________________________________________________ 
3. Site Development Brief – West of Barochan Road, Houston 
3.1 The site development brief relating to West of Barochan Road, Houston sets
out a planning framework for the site. 
3.2 The site development brief highlights a number of considerations which
require to be taken into account when preparing a development proposal for
the site. 
Item 10
PACC140622 Page 75 of 148

Page 80

The factors include: 
 Site context; 
 Site layout and building design; 
 Landscaping and boundary treatments; 
 Accessibility; 
 Sustainable urban drainage; 
 Renewables/Sustainability; 
 Digital connections; 
 Affordable housing; 
 Education provision; 
 Open space provision; and 
 Required supporting information. 
4. Next Steps 
4.1 If approved by the Board, the site development brief will be placed on the
Council’s web pages and used to guide development proposals for these
sites. 
4.2 It is the intention that further site development briefs will be prepared for other
sites allocated within the Renfrewshire Local Development Plan (2021) and
these will be brought to the Board in due course.
___________________________________________________________________ 
Implications of the Report 
1. Financial – The extent and details of the additional duties is still to be confirmed.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Reshaping our place, our economy, and our future – the proposed site
development briefs set out a framework for supporting, encouraging, and
delivering sustainability, climate change adaption, reaching Net Zero, biodiversity
gain and creating great places. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None.
Page 76 of 148

Page 81

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – The proposed site development briefs seek to ensure that any
development coming forward is undertaken in a sustainable manner and aids
the adaption required as a result of climate change.
___________________________________________________________________ 
Appendix 1 – Site Development Briefs: 
 West of Barochan Road, Houston.
___________________________________________________________________ 
Author: David Love, Chief Planning Officer. 
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk 
Page 77 of 148

Page 82

SITE DEVELOPMENT
BRIEF 
Land West of
Barochan Road,
Houston 
2022
Page 78 of 148

Page 83

S i t e D e v e l o p m e n t B r i e f – Land West of Barochan Road, Houston 
This brief sets out a planning framework for the site
at land West of Barochan Road, Houston which is
allocated in the Renfrewshire Local Development
Plan (2021) for residential use.
The brief sets out requirements to be addressed in
preparing a development proposal for this site. The
brief must be read in conjunction with the
Renfrewshire Local Development Plan and New
Development Supplementary Guidance. 
Site Context
The site consists of irregularly shaped open grazing
fields along with an existing house and kennels. 
Most of the site consists of undulating rough grazing
fields, with areas of overgrown shrubby vegetation.
The tree belt along the northern boundary is well
established and effectively screens the site when
approaching the settlement from the north. The site
slopes down from north to the south where it meets
existing housing. 
The site sits adjacent to Houston Conservation Area
with the North Mound Scheduled Monument and a
War Memorial in close proximity. 
Vehicular access is available from Barochan Road with
opportunities to link into the surrounding path network.   
North Mound
War
Memorial
Page 79 of 148

Page 84

S i t e D e v e l o p m e n t B r i e f – Land West of Barochan Road, Houston 
Site Layout and Building Design
Residential development of the site requires to be at a density
which reflects the surrounding area incorporating well designed
landscaped areas and include a mix of housing types (detached
and semi-detached and terraced houses) and tenure including
new affordable homes. 
The proposal requires to demonstrate how inclusive design will be
achieved with the development relating to and linking well with the
surrounding residential area. The design and finishing materials of
the new houses will also require to relate to the existing adjoining
residential areas. 
The layout and design of the site should add to and enhance the
setting of Houston Conservation Area with particular consideration
given to the setting of the adjacent North Mound Scheduled
Monument and War Memorial. The development will required to
be set back from the ridge line along the northern boundary
safeguarding views to and from North Mound. 
The housing on the site will required to be well integrated in terms
of style, appearance and materials with a high standard of
development layout and design. 
Renfrewshire’s Places Design Guide sets out further guidance in
relation to sustainable place making and design and this requires
to be reflected in any development proposal:
http://www.renfrewshire.gov.uk/article/3041/Development-
Planning-Guidance
Landscaping and Boundary Treatments
An established hedge is located to the north with a well-established
belt of trees beyond. In the western area of the site there is an area
of shrubby vegetation. Located in the south out with the site there
is an area of established mature woodland. 
Development must protect existing trees, including the tree belt
along the northern boundary, protecting important habitats and
biodiversity as well as maintaining the existing natural screening
which will assist in visually containing the site. 
In order to protect existing trees, any development should include
landscape buffers around trees, which will be informed by a tree
survey (to be undertaken by the applicant).  The landscape buffers
will ensure any new development is sited well clear of root
protection areas and the crown spread of trees. 
The provision of planting and preservation of trees must be in line
with the Renfrewshire’s Planning & Development Tree Policy. 
There is a presumption against any tree removal on site and any
proposed development should be designed to take account of
existing trees on site.  Should the development proposal identify the
removal of any trees, a detailed justification together with a
comprehensive landscaping scheme and appropriate
compensatory planting will be required. 
Residential development will be required to add to and enhance the
existing green network by ensuring that new on site green
Page 80 of 148

Page 85

S i t e D e v e l o p m e n t B r i e f – Land West of Barochan Road, Houston 
infrastructure is incorporated with links into the wider green
network. 
Boundary treatment using high quality materials and planting will be
required to define public and private spaces contributing to the
areas character. 
Accessibility
Development proposals will require to demonstrate integration and
connectivity with formal and informal routes including rights of way,
core paths, footways along existing roads and local streets as well
as indicating pedestrian connections links to the village centre,
schooling and bus routes/bus stops. 
A plan showing safe routes to school/local services requires to be
included in the planning submission as well as how the site
functions as a 20 minute neighbourhood. 
The site layout must provide safe routes for pedestrians, cyclists
and vehicular traffic to move through the development including
direct routes for all users. Particular focus requires to be given to
the movement of pedestrians and cyclists to promote active travel. 
Parking must be well integrated with resident parking provided
within the curtilage of the dwelling or within dedicated private
parking areas. Visitor parking also requires to be distributed
throughout the site. 
The level of parking provision must be in line with the SCOTS
National Roads Development Guide and should be discussed with
the Council prior to the submission of the planning application. 
Flood Risk and Sustainable Urban Drainage Systems
The majority of this site is not impacted from a flood risk
perspective, however, it is adjacent to the 1:200-year fluvial outline
of the Houston Burn. It will be necessary to make sure that all
development is set back and above this watercourse and a buffer
strip will be required to separate the watercourse and development. 
A detailed Flood Risk Assessment and Drainage Strategy will be
required to confirm the developable extent of the site and ensure
that there is no impact from the development to surrounding areas. 
Drainage requirements, constraints and solutions will be integral to
the layout and submission of the planning application.  New
development will require to integrate surface water management
into the design of green infrastructure including naturalised
Sustainable Urban Drainage Systems and permeable surfaces. 
Renewables/Sustainability
Low or Zero carbon generating technologies require to be
integrated into the development proposal including the use of both
active carbon reducing technologies such as solar panels or ground
source heat pumps and passive factors such as orientation, siting,
ventilation and sustainable materials. Provision requires to be made
for electric car charging points for residents. 
Page 81 of 148

Page 86

S i t e D e v e l o p m e n t B r i e f – Land West of Barochan Road, Houston 
These details will require to be outlined in a Sustainability
Statement and submitted along with the planning application. 
Digital Connections
The development will incorporate existing or future high speed
digital network connections and other digital technologies that
improves connectivity. These details require to be included in the
submission of the planning application. 
Affordable Housing
Affordable housing requirements for this site will be 25% of the total
site capacity, which will require to be provided on-site. 
Affordable housing requires to be tenure blind with a similar design
and style to the open market housing. 
Early discussions with the Council are encouraged to discuss the
requirements for the delivery of affordable homes on site and
potential Registered Social Landlord partners. 
Education Provision
The cumulative impact of residential development on both primary
and secondary school provision will require further consideration
subject to the final site capacity, potential site start and phasing of
the development. 
It is likely that a developer contribution will be required for education
infrastructure as a direct result of the new development. 
Open Space Provision 
Children’s play areas are sought for all housing developments in
excess of 50 units. Provision should be the equivalent to 1 square
metre per house in the form of a single area serving 50-150 units. 
The open space should contain play equipment which is central to
the layout, with natural surveillance from streets and houses with
good landscaping. 
Supporting Information
Bat roost potential has been identified within the roof spaces of the
farm buildings around the kennels. Bat surveys would be required
prior to any work being done on these buildings. 
A planning application should be accompanied by the following
information:
• Sustainability Statement
• Ecology Report/ Habitat Survey
• Bat Survey
• Drainage/Flood Assessment
• Transport Statement
• Site Investigation (soil condition)
• Design and Access Statement
• Tree Survey
• Landscape/Built Heritage Visual Assessment & Plans
• Archaeological Assessment 
• Planning Statement
Page 82 of 148

Page 87

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  14 June 2022
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading:  Tree Preservation Order Request
___________________________________________________________________ 
1. Summary 
1.1 This report responds to requests to apply a Tree Preservation Order (TPO) to
sites in Erskine and Inchinnan.   
1.2 The requests submitted are considered in line with the relevant legislation,
namely, Section 160 of The Town and Country Planning (Scotland) Act 1997
as amended by the Planning etc (Scotland) Act 2006, and within the
procedures set out in the Town and Country Planning (Tree Preservation
Order and Trees in Conservation Areas) (Scotland) Regulations 2011. 
1.3 The report recommends that a tree preservation order is made in relation to
the two sites proposed.   
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
(i) Approve the need for a tree preservation order in respect of the tree group
known as Sandieland Wood and agree that officers proceed to prepare the
order, serve it on relevant parties and make the order available to the
public and seek representations.  
(ii) Approve the need for a tree preservation order in respect of the tree group
known as Erskine Hotel Wood and agree that officers proceed to prepare
the order, serve it on relevant parties and make the order available to the
public and seek representations.  
___________________________________________________________________ 
Item 11
PACC140622 Page 83 of 148

Page 88

3. TPO Requests 
3.1. Two requests have been received in respect of suggested wooded areas
where tree preservation orders should be made.  Both sites in question have
been assessed.   
3.2. The two areas in question are as follows:
 Sandielands Wood, Inchinnan;
 Erskine Hotel Wood, located between the A726 and the Mutha Hotel; and   
4. Renfrewshire Planning & Development Tree Policy 2022 
4.1. The Renfrewshire Planning & Development Tree Policy 2022 was approved
by the Communities, Housing and Planning Policy Board in March 2022. 
4.2. The approved policy outlines how tree preservation orders (TPO) are made
and the process that is followed when requests are received.   
4.3. In light of the above, the sites in question have been assessed and a
recommendation provided in respect of the amenity value of the trees in
question.  The assessments undertaken in respect of each of the three sites in
question are detailed below. 
5. TPO Considerations 
Sandieland Wood 
5.1. The Sandieland Wood is located southeast of Torran Drive, Erskine and is
currently surrounded by farmland with recent suburban housing estates to the
northwest and southwest.  The woodland in question is detailed in Appendix
1. 
5.2. The woodland is of a linear shape on a slight elevation in an otherwise flat
landscape.  It is bounded by a low dry stone retaining wall, similar to the
nearby Teucheen Wood TPO and SINC.   
5.3. It is significant to note that part of the woodland is currently subject to a
planning application which is currently under consideration and concerns the
erection of a residential development comprising fifty-nine dwellinghouses and
twenty-four flats, including access, drainage, landscaping and associated
works (22/0178/PP). 
5.4. The woodland comprises mature mixed woodland of plantation origin, which is
dominated by Pedunculate Oak (>50% of the canopy), Scot’s Pine (c15% of
canopy), Beech (10%) and Silver Birch (10%). Canopy gaps occupy about
15% of the site, mainly where an old, silted up and vegetated hollow shows
where a pond used to be. Other tree and shrub species are present, for
example, a large Sycamore on the northern boundary, at least one old Alder,
plus Downy Birch, Ash, Grey Willow, Goat Willow, Rowan, Holly and
Hawthorn. 
Page 84 of 148

Page 89

5.5. The canopy includes trees approaching veteran status, with a few Beech
surviving which are more than 200 years old, several of the Oaks in the 100-
150 age bracket and some of the Scot’s Pine exceeding 100 years old. One
boundary Sycamore exceeds 100 years and there is a very large Common
Alder which probably approaches 100 years. Beech probably used to occupy
a larger proportion of the canopy, but several fallen giants can now be seen
on the ground, as 200 years is about the maximum age expectation for the
species in Scotland. 
5.6. The assessment undertaken in relation to the site concludes that the
woodland is in good/fair condition and is mapped as established woodland on
the 1st series ordnance survey map for the area.  In addition, the woodland is
considered to be a prominent landscape feature and has a high proportion of
very old trees. 
5.7. In terms of biodiversity the woodland is of some value as a result of its high
proportion of native oak trees and dead wood habitats, including standing
dead trees suitable for hole-nesting birds, invertebrates and fungi. 
5.8. In light of the above it is recommended that the woodland, known as
Sandieland Wood, as identified in Appendix 1 is subject to a Tree
Preservation Order. 
Erskine Hotel Wood 
5.9. The woodland in question is located within the ground of the Muthu Glasgow
River Hotel, off the A726, Erskine.  The woodland in question is detailed in
Appendix 2. 
5.10. It should be noted that the site is designated as a Site of Importance for
Nature Conservation (SINC). 
5.11. It is significant to note that the site in question is currently subject to a
planning application which seeks the erection of a residential development in
principle (19/0765/PP). 
5.12. The woodland comprises mature broad-leaved woodland, which is dominated
by Sycamore and Ash, but which has a variety of other tree species in the
canopy, including Wych Elm, Horse Chestnut, Silver Birch, Downy Birch,
Pedunculate Oak, Crack Willow, Lime, Alder, Beech and a single Yew. 
5.13. The understorey is also diverse, containing Hawthorn, Goat Willow, Rusty
Willow, Holly, Elder, Honeysuckle, Bramble and Raspberry, as well as a large
component of planted or “garden escape” non-native shrubs, e.g. Snowberry,
Dogwood, Portuguese Laurel. Cherry Laurel and Mountain Currant. 
Page 85 of 148

Page 90

5.14. The field layer is quite diverse for a small woodland area and includes three
species of orchid (Broad-leaved Helleborine, Twayblade and Common
Spotted-orchid) as well as some typical woodland species, e.g. Bluebell,
Wood Sorrel, Enchanters Nightshade and Wood Dock. In places grasses and
ferns predominate, especially Tufted Hair-grass, Male Fern and Broad
Buckler-fern. In some areas near the site of the long demolished North Barr
buildings, the groundflora reflects the horticultural heritage associated with the
former walled garden and non-native species like Solomon’s Seal and Crow
Garlic (Allium vineale) are well represented. 
5.15. Further variation is provided by an area of Ash and Willow dominated
secondary woodland, which has colonised the formerly open ground within a
demolished walled garden over the last few decades. Beneath the nearly
closed canopy the area retains tall ruderals (e.g. Stinging Nettles, Rosebay
Willowherb) and marshy grassland with rushes, Wild Angelica and Marsh
Thistle, suggesting that soil drainage has become impeded since its
horticultural heyday. 
5.16. The assessment undertaken in relation to the site concludes that the
woodland is in good/fair condition and is mapped as established woodland on
the 1st series ordnance survey map for the area.  In addition, the site is
included on Scottish Forestry’s Native Woodland Survey of Scotland as
Lowland Mixed Deciduous Woodland, a habitat category included on the
Scottish Biodiversity List by NatureScot and prioritised as “conservation action
needed”. 
5.17. As noted, part of the site is located within SINC No. 72 and is therefore a
woodland with a local designation. 
5.18. The assessment of the site notes that almost all canopy trees fall into an age
range of around 50-80 years old and many are multiple stemmed, suggesting
that the trees may have been harvested as part of the war effort in WW2, and
then regenerated from coppice stools. The size of these stools suggests a
replanting during the early 19th Century.  Along the southern edge there are
some multi-stemmed Pedunculate Oaks and Limes on a steeper slope which
are growing from stools which are much larger in size. In the case of the Oaks
these are over 2m in diameter suggesting trees with an origin dating back
300+ years.   In this general vicinity there are also (now partially hidden) dry-
stone retaining walls, a stock exclusion feature found around woodlands
elsewhere in the wider Erskine area and dating back at least into the 18th
Century. 
5.19. In light of the above it is recommended that the woodland, known as Erskine
Hotel Wood, as identified in Appendix 2 is subject to a Tree Preservation
Order.   
Page 86 of 148

Page 91

6. Next Steps 
6.1 A TPO is prepared in respect of the woodland at both Sandieland Wood and
Erskine Hotel Wood.  Thereafter each of the orders will served on the
respective landowners and made available to the public for comment. 
6.2 In the event that no comments are received the respective order will be
confirmed and all parties informed.  In addition, the order will be made
available to the public and recorded in the Land Register of Scotland. 
6.3 Should comments be received, these will be considered and assessed to
determine if the order requires to be modified or withdrawn. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
4. Legal – The recommendations in the report would require for two separate
tree preservation orders to made in relation to the sites in question.  Should
the orders be confirmed they would require to be lodged with the Land
Register of Scotland. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None.
Page 87 of 148

Page 92

12. COSLA Policy Position - None.
13. Climate Risk – The proposed site development briefs seek to ensure that any
development coming forward is undertaken in a sustainable manner and aids
the adaption required as a result of climate change.
___________________________________________________________________ 
Appendix 1: Site Plan – Sandieland Wood
Appendix 2: Site Plan – Erskine Hotel Wood
___________________________________________________________________ 
Author: David Love, Chief Planning Officer
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk 
Page 88 of 148

Page 93

1:6,529
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417
I
0 110 220 330 44055
Meters
Date: 25/05/2022
Sandieland Wood
Page 89 of 148

Page 94

1:4,695
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417
I
0 80 160 240 32040
Meters
Date: 25/05/2022
Erskine Hotel Wood
Page 90 of 148

Page 95

SUMMARY OF APPLICATIONS TO BE CONSIDERED BY
THE PLANNING AND CLIMATE CHANGE POLICY BOARD
ON 14/06/2022
RENFREWSHIRE COUNCIL
Item No.PROPOSAL:LOCATION:APPLICANT: WARD:
APPN. NO:
21/1030/PP Turnberry Homes Ltd
18 Allerdyce Drive
Great Western
Business
Glasgow
G15 6RY
Site Between
Fordbank Stables
And
Corseford Avenue
Johnstone
Renfrewshire
Erection of 49 dwellinghouses
with associated roads,
carparking, and landscaping.Ward 8
RECOMMENDATION: Grant Subject to Conditions
A
20/0516/PP Elderslie Golf Club And
Dickie & Moore Homes
The Atrium
6 New Road
Ayr
KA8 8EX
Land East Of
Newton Cottage At
Elderslie Golf Club
Newton Avenue
Elderslie
Johnstone
Erection of residential
development comprising 17
dwellinghouses and 8 flats with
associated infrastructure, parking
and landscaping; and erection of
relocated greenkeeping facility
with associated storage
Ward 8
RECOMMENDATION: Grant subject to conditions
B
22/0057/PP Mr Zubair Malik
JM Real Estate Ltd
2 Fitzroy Place
Glasgow
G3 7RH
Unit E
1 Glenburn Road
Paisley
PA2 8TA
Erection of drive-through dessert
parlour (Class 1) with associated
access and parkingWard 6
RECOMMENDATION: Refuse
C
Total Number of Applications to be considered =  3
Item 12
PACC140622 Page 91 of 148

Page 96

Page 92 of 148

Page 97

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Supplementary Report
Reference No.    21/1030/PP       
Agenda Item
KEY INFORMATION 
Ward: (8)
Johnstone South and
Elderslie 
Applicant:
Turnberry Homes Ltd 
Registered: 
13 May 2021 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of 49 dwellings with
associated roads, car parking and landscaping. 
LOCATION: Site between Fordbank Stables and Corseford
Avenue, Johnstone 
APPLICATION FOR: Full Planning Permission 
This supplementary report should be read together with
the original report of handling considered by the
Communities, Housing and Planning Policy Board on 15
March 2022. 
BACKGROUND
The Communities, Housing and Planning Policy Board at its
meeting on 15 March 2022 considered the attached report of
handling and decided to continue the consideration of the
report to allow a site visit to take place.  The detailed
assessment of the proposed development is included in the
attached report of handling.   
SITE VISIT
A site visit took place on the 8 June 2022 and those
members attending viewed the application site and its
surroundings. 
The site visit was conducted in accordance with the Protocol
for Site Visits (22 May 2018) and members attending did not
discuss the merits of the proposal. 
CONCLUSION AND RECOMMENDATION
It is considered that assessment of the proposed
development, as detailed in the attached report of handling,
is sufficient to recommend that planning permission be
granted subject to conditions. 
For clarity the recommendation with reasons and conditions
are set out below: 
Alasdair Morrison
Head of Economy &
Development
Item 12(a)
PACC140622 Page 93 of 148

Page 98

Renfrewshire Council Planning and Climate Change Policy Board Page 2
Planning Application: Supplementary Report
Reference No.    21/1030/PP       
Agenda Item (A)
Reason for Decision
The proposal accords with the provisions of the Development Plan and there are no material
considerations which outweigh the presumption in favour of development according with the
Development Plan. 
Conditions 
1 No development shall commence on site until written approval of: 
(a) a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended
therein 
(b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained within the site
investigation report 
all prepared in accordance with current authoritative technical guidance, have been
submitted to and approved in writing by Renfrewshire Council as Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
2 That prior to the occupation of any residential unit on the site: 
(a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; or 
(b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use 
shall be submitted to and approved in writing by Renfrewshire Council as Planning
Authority. Verification Reports shall not be submitted on a phased basis unless first
agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for use have
been completed. 
3 That, prior to the erection of any of the dwellinghouses hereby approved, a detailed
schedule of the proposed external finishes for each of the dwellinghouses together
with a plan and schedule of the surface treatments to be used on the roads and
footpaths within the site shall be submitted for the written approval of Renfrewshire
Council as Planning Authority. Thereafter, the houses, roads and footpaths shall be
constructed only in accordance with such details as may be approved to the
satisfaction of Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area. 
4 That, prior to the commencement of the development, details of all boundary
treatments to be formed shall be submitted for the written approval of Renfrewshire
Council as Planning Authority. Thereafter, all boundary fences and walls as may be
Page 94 of 148

Page 99

Renfrewshire Council Planning and Climate Change Policy Board Page 3
approved relating to or adjacent to each plot shall be erected prior to the occupation
of the dwelling within that plot to the satisfaction of Renfrewshire Council as Planning
Authority. 
Reason: In the interest of the amenity of the area. 
5 That no development shall take place until there has been submitted to and approved
by Renfrewshire Council as Planning Authority a scheme of landscaping, which shall
include details of species, planting densities, soil treatment and aftercare. 
Reason: In the interest of the amenity of the area. 
6 That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the
completion of the development die, are removed or become seriously damaged or
diseased shall be replaced in the next planting season with others of a similar size
and species, unless Renfrewshire Council as Planning Authority gives written
consent to any variation. 
Reason: In the interest of the amenity of the area. 
7 Prior to the development commencing, the developer shall secure the implementation
of archaeological works in accordance with a written scheme of investigation which
has been submitted by the applicant and approved by the Planning Authority. 
Thereafter, the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological resources
within the development site is undertaken to the satisfaction of the Planning
Authority. 
Reason: To ensure that any archaeological remains which may be disturbed can be
identified, excavated, and recorded. 
8 That prior to the commencement of development, details of phasing for off-site
infrastructure works/footways/crossings shall be submitted for the written approval of
Renfrewshire Council as Planning Authority. Thereafter, the development shall be
implemented only in accordance with such phasing as may be agreed with
Renfrewshire Council as Planning Authority, unless otherwise agreed in writing. 
Reason: In the interest of the amenity of the area. 
9 That the development hereby approved shall be implemented in line with the
Drainage Strategy Report by Fairhurst dated March 2021 and Drawing No:
128649/8006 ‘Overland Flow Routing’ and Drawing No: 128649/8003 ‘Proposed
Drainage Layout’, to the satisfaction of the Planning Authority. 
Reason: To ensure that the site is appropriately drained. 
10 That prior to the commencement of development, the applicant shall submit for the
written approval of Renfrewshire Council as Planning Authority, an Arboricultural
Method Statement, and long-term Tree/Woodland Management & Maintenance
Plan(s) for the site. For the avoidance of doubt, the Arboricultural Method Statement
shall contain details on how retained trees will be protected on site through the
construction phase and future use of the site and the Tree/Woodland Management &
Page 95 of 148

Page 100

Renfrewshire Council Planning and Climate Change Policy Board Page 4
Maintenance Plan(s) shall contain details on the monitoring of growth and condition
of all newly planted trees.   
Reason: To ensure that works are undertaken to a satisfactory standard in the
interests of natural heritage. 
11 That prior to the commencement of development, the applicant shall submit for the
written approval of Renfrewshire Council as Planning Authority, A Low Carbon
Energy Implementation Plan which will include the final details of energy efficiency
measures to be implemented at the site as well as consideration of Electric Vehicle
Charging Points. 
Reason: To promote and implement low carbon measures at the site.   
12 That prior to the commencement of any development of works on site, the developer
shall provide for the written approval of Renfrewshire Council as Planning Authority
full details of a Locally Equipped Play Area (LEAP) to be provided in the designated
area as detailed on Drawing No. AL(0)004 Revision A. Thereafter, prior to occupation
of the final residential unit, the developer shall complete for use, the provision of the
LEAP area in accordance with the detail finally approved. 
13 That prior to the commencement of any development of works on site, the developer
shall provide for the written approval of Renfrewshire Council as Planning Authority a
maintenance scheme for the play area approved as per condition 12. 
Reason: In the interests of residential amenity 
14 That prior to the commencement of development, the developer shall provide details
of two pedestrian connections of 3m width, from the northeast of the development
onto Corseford Avenue, for the written approval of Renfrewshire Council as Planning
Authority.  The connections as agreed shall be provided prior to the occupation of
any unit within the development. 
Reason: In the interest of pedestrian and vehicular safety and to ensure that the
development is acceptably connected to the surrounding area. 
15 That prior to the commencement of development, details of two pedestrian dropped
kerb crossing points on Corseford Avenue, one south of the junction with Tweed
Place and one north of the junction with Tweed Place, shall be submitted for the
written approval of Renfrewshire Council as Planning Authority and shall be provided
prior to the occupation of any dwellinghouse hereby approved. 
Reason:  In the interest of pedestrian safety. 
16 That prior to the commencement of development, details of a 2m footway to be
located on the western side of Corseford Avenue from the junction of Beith Road to
the pedestrian crossing north of Tweed Place, shall be submitted for the written
approval of Renfrewshire Council as Planning Authority, and shall be provided prior
to the occupation of any dwellinghouse hereby approved. 
Reason: In the interests of traffic and pedestrian safety. 
17 For clarification, the proposed footpath link onto the existing track to the south, shall
be 3m wide and shall connect into Fordbank Drive. 
Page 96 of 148

Page 101

Renfrewshire Council Planning and Climate Change Policy Board Page 5
Reason: To provide pedestrians and cyclist a direct route to Beith Road. 
18 For clarification, the proposed access onto Corseford Avenue shall be constructed in
accordance with the National Roads Development Guide. 
Reason: In the interests of safety 
19 In the interests of clarification, parking for vehicles and bicycles shall be provided in
accordance with the National Roads Development Guide. 
Reason: In the interests of safety. 
20 That prior to the occupation of any dwellinghouse hereby approved, the existing bus
stop on Corseford Avenue shall be upgraded with a new shelter and high access bus
kerbs, to the satisfaction of Renfrewshire Council as Planning Authority. 
Reason:  In the interests of safety. 
Alasdair Morrison
Head of Economy & Development 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact Gwen McCracken on 07483 419705. 
Page 97 of 148

Page 102

Page 98 of 148

Page 103

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
KEY  INFORMATION 
Ward: (8) 
Johnstone south and
Elderslie 
Applicant: 
Turnberry Homes Ltd. 
Registered:  
13 May 2021 
RECOMMENDATION 
Grant subject to
Conditions 
Report by Head of Economy and Development 
PROPOSAL: Erection of 49 dwellings with associated roads,
carparking and landscaping. 
LOCATION: Site between Fordbank Stables and Corseford
Avenue, Johnstone 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES
• The application site is identified as a housing land supply site
within the Adopted Renfrewshire Local Development Plan
2021 (Policy P2). 
• There have been 3 objections to the proposal which have
sought to highlight existing traffic congestion problems at the
traffic light controlled junction on Beith Road at Hallhill Road
and the existing strain on local services in the area. Johnstone
Community Council have objected. 
• There have been no objections from consultees, however
Johnstone Community Council have raised concerns. 
• The proposals are compliant with the relevant provisions of the
Adopted Renfrewshire Local Development Plan 2021 and
would provide a range and choice of house types within the
area.  The form, siting, design, density, external finishes, and
layout of the proposed development is acceptable. 
• Adequate parking has been provided together with good
connections to walking, cycling and public transport networks.   
Alasdair Morrison
Head of Economy &
Development
Item 12(a)
PACC140622 Page 99 of 148

Page 104

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
APPLICANT: Turnberry Homes Ltd
SITE ADDRESS: Site between Fordbank Stables and Corseford Avenue,
Johnstone
PROPOSAL: Erection of 49 dwellinghouses with associated roads, carparking
and landscaping.
RECOMMENDATION: Grant subject to conditions 
PRE-APPLICATION
COMMENTS
Pre-application meetings have taken place, the main points of
principle and detail discussed were in relation to: 
• Flooding/Drainage;
• Walking/cycling/public transport networks;
• Internal and external road network;
• Educational requirements;
• Layout/design/play and open space provision;
• Range and types of housing;
• Low Carbon Design/development; 
PROPOSALS This application seeks planning permission for the erection of 49
residential units. The proposal was amended from 53 units to 49
units to enable a better mix of housing to be provided. 
The application site comprises an area of former agricultural land
bounded by the railway line to the north, Beith Road to the south
and areas of housing to the east and southwest.  The site is
bound to the northwest by an area of land associated with
Fordbank Stables.     
The homes would be made up of three and four bedroom houses
with a mix of detached, semi-detached, and terraced houses. 
The proposed finishing materials would comprise of dry dash
render, cast stone details with slate grey roof tiles and white upvc
windows.  Windows would have vertical proportions to reflect
surrounding properties and door styles would add a
contemporary element to the development. 
The development would be accessed from the southeast off
Corseford Avenue.  Internally, the primary street would be a loop,
stepping down to secondary streets and lanes. Consideration
was initially given to two points of access, however, further
investigation by the applicant revealed issues relating to land
ownership which prohibited an access at the northern end of the
site.     
The layout includes provision of new pedestrian connections on
the north-eastern boundary of the site via the access road onto
Corseford Avenue, the bus stops and railway station at Milliken
Page 100 of 148

Page 105

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Park and to the south via a new section of foot/cycle way from
the loop road to Fordbank Stables Lane onwards to Beith Road,
connecting the site to the surrounding area. 
Two areas of open space would be provided within the
development.  In the northern portion of the site a landscaped
area containing a SUDS pond would be provided.  An area of
informal space with play equipment would be provided centrally
within the development surrounded by landscaping. Planned
landscaped edges provide further areas of open space within the
development. 
SITE HISTORY 19/0865/NO – Residential development with associated roads,
infrastructure, and landscaping.  Agreed    
Page 101 of 148

Page 106

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
CONSULTATIONS Johnstone Community Council – Concerns raised in relation
to the following:
▪ The site is identified as Greenbelt in the Adopted Local
Development Plan;
▪ Representations had previously been submitted in
relation to the release of Greenbelt land;
▪ Road congestion and on street parking on Corseford
Avenue and its impact on traffic on surrounding roads. 
Environment & Infrastructure Services (Roads) – No
objection subject to condition. 
Environment & Infrastructure Services (Design) – No
objection subject to condition. 
SEPA – No objection. 
Scottish Water – No objection. 
NatureScot - No objection. 
West of Scotland Archaeology Service - No objections subject
to condition. 
Communities & Housing Services (Environmental Protection
Team) – No objections subject to conditions. 
Children Services – No comment. 
Glasgow Airport – No comment. 
NATS/Nerl Safeguarding – No comment. 
Network Rail – No comment.
REPRESENTATIONS Three representations have been received, objecting to the
proposals. 
The concerns raised can be summarised as follows: - 
Page 102 of 148

Page 107

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
The proposed housing development is contrary to the
Development Plan. 
The proposed loss of a high-quality greenfield site as a priority
for housing development over brownfield sites in the area is
inappropriate in terms of Scottish Planning Policy. 
If housing had been restricted to the lower half of the site it would
have mitigated loss of trees and semi-natural woodland. 
There is an existing traffic congestion problem at the poorly
designed traffic light controlled junction on Beith Road at Hallhill
Road where various school and bus routes clash.  Adding even
more traffic to this area will impact the junction further and
surrounding road network which is at capacity. 
The footpath link from the development onto Fordbank access
lane may encourage the use of Fordbank estate as a shortcut to
Beith Road and serves little purpose given its condition. 
Levels of dust during construction. 
The south Johnstone area is now saturated with housing
developments which have placed a continuing strain on local
infrastructure. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan 2021 
Policy P2 Housing Land Supply
Policy P3 Housing Mix and Affordable Housing
Policy P6 - Open Space 
Policy I1 Connecting Places
Policy I3 Flooding and Drainage
Policy I7 Zero and Low Carbon Buildings 
Draft New Development Supplementary Guidance 2019
Delivering the Places Strategy: Affordable Housing and Open
Space Provision in New Developments
Delivering the Infrastructure Strategy: Connecting Places;
Provision for Waste Recycling in New Developments; and
Flooding and Drainage 
Delivering the Environment Strategy: Noise and Contaminated
Land. 
Material considerations
Renfrewshire’s Places Residential Design Guide March 2015 
PLANNING
ASSESSMENT
The application site is identified as being a housing site within
the Adopted Renfrewshire Local Development Plan 2021 under
Policy P2. 
Page 103 of 148

Page 108

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Policy P2 identifies the site as contributing to the 5-year supply
of effective housing land required for Renfrewshire.   
The principle of residential development on the site is therefore
accepted. 
Policy P3 of the Adopted Renfrewshire Local Development Plan
is also applicable in the assessment of the proposal, as it seeks
to ensure that on residential sites, a mix of housing types are
encouraged to meet current and future housing needs and to
support sustainable mixed communities. 
Although the proposal is under the threshold for affordable
housing provision, the application proposes a mix of 3 and 4
bedroom properties ranging from terraced, semi-detached and
detached properties, widening choice within the local area. 
It is considered that the applicant has demonstrated that the
development would achieve the requirements of Policy P3,
relative to housing mix and house type. 
Development proposals must also comply with the requirements
of the draft New Development Supplementary Guidance as it
relates to residential developments and the associated
Residential Design Guide which form the basis of good place
design.  The main issues of consideration in this regard are
assessed as follows: 
Context and Character
The proposed development is considered to respond to the
context in which it is sited, which is characterised by a mix of
housing styles, sizes, densities, and ages.   
On the northern side of Corseford Avenue is a development of
housing dating from the 70’s/80’s with a mix of house sizes and
types, while at the entrance to the site on the south side of
Corseford Avenue is a small cottage development consisting of
an old steading and other farm buildings.  South of the site
across Beith Road are several new build developments offering
a range of properties including detached, semi-detached,
terraced, and flatted properties. Within these pockets of
development there are a mix landscapes and a mix of boundary
treatments including open boundaries and planted boundaries. 
The site itself contains a number of mature trees predominantly
along its north western and south eastern boundaries.  Although
none of these trees are protected by a tree preservation order, a
tree survey was submitted in support of the application outlining
the health and maturity of each tree.  While some of the trees are
not particularly good specimens, it is proposed to retain a
number of quality species within the development particularly on
Page 104 of 148

Page 109

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
the north eastern boundary where a line of mature trees would
be retained and on the southern boundary of the site where trees
would be augmented with a robust landscaping scheme. 
Therefore, the site would retain a degree of enclosure provided
by wooded boundaries to two sides which would be augmented
through additional landscaping, tree planting, new hedges, and
other biodiversity measures to be implemented as part of the
proposals. 
The proposed layout seeks to integrate with the surrounding area
with dwellings fronting onto Corsefield Avenue providing an
active frontage. The dwellings proposed are of modern design,
with a mix of detached, semi-detached and terraced properties
interspersed with areas of open space and planting. 
It is considered that the design and layout of the development
set within a degree of existing landscaping would create an
attractive development, contributing positively to the surrounding
area. 
Access and Connectivity    
An important consideration in the assessment of this application
is connectivity between the development and the wider transport
network. Policy I1 of the adopted Renfrewshire Local
Development Plan (2021) states that development proposals
require to ensure appropriate provision and accessibility.
Proposals which give priority to sustainable modes of transport
and have no significant impact on the safe and efficient operation
of the local or trunk road network will be supported. 
Access to the site for vehicles would be from one access point
to the southeast (Corseford Avenue) and pedestrian access is
proposed via both sides of the vehicle access and via a proposed
footpath to the south of the site that links onto the footway on
Beith Road, via Fordbank Lane. Parking within the development
is provided in accordance with the required standards and as
such 128 spaces are proposed as part of the development, which
include 7 visitors spaces.   
The Transport Statement submitted in support of the application
has demonstrated that the level of trips likely to be generated by
the proposed development during peak hours is not significant
and would not have a notable impact on the operation of the
surrounding network, including junctions.  Environment and
Infrastructure Services (Roads) are satisfied with the Transport
Statement and has offered no objection to the proposal.   
Pedestrian and cycle access from the site is available from the
east and south, providing direct connections with Corseford
Avenue, Beith Road, and the wider network. 
Page 105 of 148

Page 110

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Safe routes to school are available to surrounding primary and
secondary schools.  All existing routes are well lit and are
considered safe for children providing the available crossing
facilities are used where necessary. 
The layout incorporates well-lit and well observed pedestrian
links between the site and neighbouring residential areas to the
north of Corsefield Avenue, south side of Beith Road, to the bus
stop on the site boundary and Milliken Park train station 500m to
the northeast.   
Layout and Built Form
The proposed layout would fit well with the surrounding area. 
The layout respects privacy and provides appropriate garden
sizes and areas of open space.  The development provides a
good level of amenity for each dwelling and a good outlook to all
sides of the site. 
Environment and Community
There is considered to be sufficient provision of amenity and
recreational open space within the development, with one area
located centrally within the site capable of accommodating an
equipped play area and another area of open amenity space in
the vicinity of the SUDs Pond located on the northern boundary
of the site. Footpath connections would provide access to the
surrounding countryside. 
The landscape approach to the layout has been informed by the
existing form and topography of the site and surrounding area
and the block plan includes enhancement of the existing mature
trees on the northern and southern boundaries. A detailed
landscape and planting strategy requires to be submitted as part
of the application and can be secured through planning
conditions.   
With regard to Policy I3 of the Adopted Renfrewshire Local
Development Plan and the supplementary guidance on Flooding
and Drainage, a Drainage Strategy was submitted in support of
the application.  Consultation with Environment and
Infrastructure Services (Design), concluded that the proposed
development would have no detrimental impact and a
sustainable urban drainage system has been incorporated into
the layout. 
In view of the above, the proposal is considered to comply with
Policy I3 and the associated supplementary guidance. 
Buildings and Design
The proposed dwellings are of modern design and house types
are varied in their layout, roof form, orientation and finishing
materials, reflecting densities within the surrounding area. 
Page 106 of 148

Page 111

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Typical house elevations would include dry dash rendered walls
with cast stone details.  The cast stone would be predominantly
grey and the render either light cream or white in colour.  The
roofs would generally be of slate grey concrete tiles and the
windows would have vertical proportions. 
This palette of materials and vertical emphasis is reflective of the
surrounding areas. 
Therefore, the proposed development is considered to comply
with the New Development Supplementary Guidance and
associated residential design guide. 
Policy I7 of the adopted Renfrewshire Local Development Plan
relates to Renewable and Low Carbon Energy Developments
and seeks for all major developments to consider renewable
energy sources, particularly the use of a district heating network
(or other low carbon alternatives). 
The applicant confirms support for the principle of reducing
carbon emissions by reducing energy demand through first
approach, to the provision of energy efficient housing.  This
approach is in line with Policy I7. 
Site Characteristics
There have been no objections to the application from any of the
consultees, subject to conditions to secure a scheme of
archaeological works, site investigations and the provision of
additional footpath linkages. Appropriate planning conditions can
be imposed to control these matters. 
Representations
In response to the points of objection not covered above, the
following should be considered: 
With regard to the loss of trees from the site, a tree survey
submitted in support of the application did not idenitfy the
presence of any ancient or veteran trees on the site and there is
no tree preservation order covering any trees on the site.
Although trees would be lost through development, many of the
trees have been retained within the development.  Additionally,
the landscaping proposals submitted as part of the application
demonstrate that an acceptable level of residential amenity and
retention of existing habitats can be achieved, and that the
development can be set within an appropriate context. 
The footpath link from the development onto Fordbank Lane
would improve permeability and connectivity for residents of both
the Fordbank Estate and the development proposed to the
benefit of the surrounding area. 
Page 107 of 148

Page 112

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Communities & Housing Services (Environmental Protection
Team) were consulted as part of the application process and
raised no concerns relative to the potential for excessive or
unacceptable dust emission during the construction phase of
development.  Notwithstanding, this matter could be controlled
by that service should a situation arise where it was considered
there were unacceptable emissions. 
Conclusion
In summary, it is considered that the proposal would create a
quality residential development within an area allocated for
residential purposes in the Adopted Renfrewshire Local
Development Plan (2021) and that it would comply with relevant
policies within the plan and the associated Supplementary
Guidance. 
In view of the above, it is recommended that planning permission
is granted. 
RECOMMENDATION Grant subject to conditions. 
Reason for Decision
The proposal accords with the provisions of the Development Plan and there are no material
considerations which outweigh the presumption in favour of development according with the
Development Plan. 
Conditions 
1 No development shall commence on site until written approval of: 
(a)      a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended
therein 
(b)  a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained within the
site investigation report 
all prepared in accordance with current authoritative technical guidance, have been
submitted to and approved in writing by Renfrewshire Council as Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
2 That prior to the occupation of any residential unit on the site: 
(a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; or 
Page 108 of 148

Page 113

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
(b) where remediation works are not required but soils are to be imported to site, a 
Verification Report confirming imported materials are suitable for use 
shall be submitted to and approved in writing by Renfrewshire Council as Planning
Authority. Verification Reports shall not be submitted on a phased basis unless first
agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for use have
been completed. 
3 That, prior to the erection of any of the dwellinghouses hereby approved, a detailed
schedule of the proposed external finishes for each of the dwellinghouses together
with a plan and schedule of the surface treatments to be used on the roads and
footpaths within the site shall be submitted for the written approval of Renfrewshire
Council as Planning Authority. Thereafter, the houses, roads and footpaths shall be
constructed only in accordance with such details as may be approved to the
satisfaction of Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area. 
4 That, prior to the commencement of the development, details of all boundary
treatments to be formed shall be submitted for the written approval of Renfrewshire
Council as Planning Authority. Thereafter, all boundary fences and walls as may be
approved relating to or adjacent to each plot shall be erected prior to the occupation of
the dwelling within that plot to the satisfaction of Renfrewshire Council as Planning
Authority. 
Reason: In the interest of the amenity of the area. 
5 That no development shall take place until there has been submitted to and approved
by Renfrewshire Council as Planning Authority a scheme of landscaping, which shall
include details of species, planting densities, soil treatment and aftercare. 
Reason: In the interest of the amenity of the area. 
6 That all planting, seeding or turfing comprised in the approved details of landscaping
shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the completion
of the development die, are removed or become seriously damaged or diseased shall
be replaced in the next planting season with others of a similar size and species, unless
Renfrewshire Council as Planning Authority gives written consent to any variation. 
Reason: In the interest of the amenity of the area. 
7 Prior to the development commencing, the developer shall secure the implementation
of archaeological works in accordance with a written scheme of investigation which
has been submitted by the applicant and approved by the Planning Authority. 
Thereafter, the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological resources
within the development site is undertaken to the satisfaction of the Planning Authority. 
Page 109 of 148

Page 114

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
Reason: To ensure that any archaeological remains which may be disturbed can be
identified, excavated, and recorded. 
8 That prior to the commencement of development, details of phasing for off-site
infrastructure works/footways/crossings shall be submitted for the written approval of
Renfrewshire Council as Planning Authority. Thereafter, the development shall be
implemented only in accordance with such phasing as may be agreed with
Renfrewshire Council as Planning Authority, unless otherwise agreed in writing. 
Reason: In the interest of the amenity of the area. 
9 That the development hereby approved shall be implemented in line with the Drainage
Strategy Report by Fairhurst dated March 2021 and Drawing No: 128649/8006
‘Overland Flow Routing’ and Drawing No: 128649/8003 ‘Proposed Drainage Layout’,
to the satisfaction of the Planning Authority. 
Reason: To ensure that the site is appropriately drained. 
10 That prior to the commencement of development, the applicant shall submit for the
written approval of Renfrewshire Council as Planning Authority, an Arboricultural
Method Statement, and long-term Tree/Woodland Management & Maintenance
Plan(s) for the site. For the avoidance of doubt, the Arboricultural Method Statement
shall contain details on how retained trees will be protected on site through the
construction phase and future use of the site and the Tree/Woodland Management &
Maintenance Plan(s) shall contain details on the monitoring of growth and condition of
all newly planted trees.   
Reason: To ensure that works are undertaken to a satisfactory standard in the interests
of natural heritage. 
11 That prior to the commencement of development, the applicant shall submit for the
written approval of Renfrewshire Council as Planning Authority, A Low Carbon Energy
Implementation Plan which will include the final details of energy efficiency measures
to be implemented at the site as well as consideration of Electric Vehicle Charging
Points. 
Reason: To promote and implement low carbon measures at the site.   
12 That prior to the commencement of any development of works on site, the developer
shall provide for the written approval of Renfrewshire Council as Planning Authority full
details of a Locally Equipped Play Area (LEAP) to be provided in the designated area
as detailed on Drawing No. AL(0)004 Revision A. Thereafter, prior to occupation of the
final residential unit, the developer shall complete for use, the provision of the LEAP
area in accordance with the detail finally approved. 
13 That prior to the commencement of any development of works on site, the developer
shall provide for the written approval of Renfrewshire Council as Planning Authority a
maintenance scheme for the play area approved as per condition 12. 
Reason: In the interests of residential amenity 
Page 110 of 148

Page 115

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
14 That prior to the commencement of development, the developer shall provide details
of two pedestrian connections of 3m width, from the northeast of the development onto
Corseford Avenue, for the written approval of Renfrewshire Council as Planning
Authority.  The connections as agreed shall be provided prior to the occupation of any
unit within the development. 
Reason: In the interest of pedestrian and vehicular safety and to ensure that the
development is acceptably connected to the surrounding area. 
15 That prior to the commencement of development, details of two pedestrian dropped
kerb crossing points on Corseford Avenue, one south of the junction with Tweed Place
and one north of the junction with Tweed Place, shall be submitted for the written
approval of Renfrewshire Council as Planning Authority and shall be provided prior to
the occupation of any dwellinghouse hereby approved. 
Reason:  In the interest of pedestrian safety. 
16 That prior to the commencement of development, details of a footway to be located on
the western side of Corseford Avenue from the junction of Beith Road to the pedestrian
crossing north of Tweed Place, shall be submitted for the written approval of
Renfrewshire Council as Planning Authority, and shall be provided prior to the
occupation of any dwellinghouse hereby approved. 
Reason: In the interests of traffic and pedestrian safety. 
17 For clarification, the proposed footpath link onto the existing track to the south, shall
be 3m wide and shall connect into Fordbank Drive. 
Reason: To provide pedestrians and cyclist a direct route to Beith Road. 
18 For clarification, the proposed access onto Corseford Avenue shall be constructed in
accordance with the National Roads Development Guide. 
Reason: In the interests of safety 
19 In the interests of clarification, parking for vehicles and bicycles shall be provided in
accordance with the National Roads Development Guide. 
Reason: In the interests of safety. 
20 That prior to the occupation of any dwellinghouse hereby approved, the existing bus
stop on Corseford Avenue shall be upgraded with a new shelter and high access bus
kerbs, to the satisfaction of Renfrewshire Council as Planning Authority. 
Reason:  In the interests of safety. 
Alasdair Morrison
Head of Economy & Development 
Local Government (Access to Information) Act 1985 - Background Papers
Page 111 of 148

Page 116

Planning Application: Report of Handling           
Reference No.    21/1030/PP 
For further information or to inspect any letters of objection and other background
papers, please contact Gwen McCracken on 07483 419705. 
Page 112 of 148

Page 117

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Supplementary Report
Reference No.    20/0516/PP       
Agenda Item
KEY INFORMATION 
Ward: (8)
Johnstone South and
Elderslie 
Applicant: 
Elderslie Golf Club and
Dickie & Moore Homes 
Registered: 
07 September 2020 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising 17 dwellinghouses and 8 flats with
associated infrastructure, parking and landscaping; and
erection of relocated greenkeeping facility with associated
storage 
LOCATION: Land East of Newton Cottage at Elderslie Golf
Club, Newton Avenue, Elderslie, Johnstone 
APPLICATION FOR: Full Planning Permission 
This supplementary report should be read together with
the original report of handling considered by the
Communities, Housing and Planning Policy Board on 15
March 2022. 
BACKGROUND
The Communities, Housing and Planning Policy Board at its
meeting on 15 March 2022 considered the attached report of
handling and decided to continue the consideration of the
report to allow a site visit to take place.  The detailed
assessment of the proposed development is included in the
attached report of handling.   
One further letter of objection has been received since the
planning application was considered at the Communities,
Housing and Planning Policy Board. No new matters have
been raised that have not been considered in the
assessment of the planning application or that are not
controlled through the planning conditions attached to the
recommendation for approval. 
SITE VISIT
A site visit took place on 8 June 2022 and those members
attending viewed the application site and its surroundings.   
The site visit was conducted in accordance with the Protocol
for Site Visits (22 May 2018) and members attending did not
discuss the merits of the proposal. 
CONCLUSION AND RECOMMENDATION
It is considered that assessment of the proposed
development, as detailed in the attached report of handling,
is sufficient to recommend that planning permission be
granted subject to conditions.   
For clarity the recommendation with reasons and conditions
are set out below: 
Alasdair Morrison
Head of Economy &
Development
Item 12(b)
PACC140622 Page 113 of 148

Page 118

Renfrewshire Council Planning and Climate Change Policy Board Page 2
Planning Application: Supplementary Report
Reference No.    20/0516/PP       
Agenda Item (A)
Reason for Decision
The proposal accords with the provisions of the Development Plan and there are no material
considerations which outweigh the presumption in favour of development according with the
Development Plan. 
Conditions
1. No development shall commence on the residential site until written approval of: 
(a) a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended therein 
(b) a Remediation Strategy and Implementation Plan identifying the proposed methods
for implementing all remedial recommendations contained within the site investigation
report 
all prepared in accordance with current authoritative technical guidance, have been
submitted to and approved in writing by Renfrewshire Council as Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
2. That prior to the occupation of any residential unit on the site: 
(a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; or 
(b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use 
shall be submitted to and approved in writing by Renfrewshire Council as Planning
Authority. Verification Reports shall not be submitted on a phased basis unless first
agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for use have
been completed. 
3. That, prior to the erection of any of the residential units or greenkeeping facility hereby
approved, a detailed schedule of the proposed external finishes for each building,
together with a plan and schedule of the surface treatments to be used on all roads and
footpaths shall be submitted for the written approval of Renfrewshire Council as
Planning Authority. Thereafter, the buildings, roads and footpaths shall be constructed
only in accordance with such details as may be approved to the satisfaction of
Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area. 
4. That, prior to the commencement of the development, details of all boundary treatments
to be formed shall be submitted for the written approval of Renfrewshire Council as
Page 114 of 148

Page 119

Renfrewshire Council Planning and Climate Change Policy Board Page 3
Planning Authority. Thereafter, all boundary fences and walls as may be approved
relating to or adjacent to each plot shall be erected prior to the occupation of the
building within that plot to the satisfaction of Renfrewshire Council as Planning
Authority. 
Reason: In the interest of the amenity of the area. 
5. No development shall take place until full details of soft and water landscaping works
have been submitted to and approved in writing by the Planning Authority. Details must
comply with Advice Note 3 ‘Potential Bird Hazards from Amenity Landscaping &
Building Design’ (available at www.aoa.org.uk/publication/safeguarding.asp). These
details shall include: 
• Drainage details including SUDS – Such schemes must comply with
Advice Note 6 ‘Potential Bird Hazards from Sustainable urban Drainage
Systems (SUDS) (available at
www.aoa.org.uk/publications/safeguarding.asp ). 
No subsequent alterations to the landscaping scheme are to take place unless
submitted to and approved in writing by the Planning Authority in consultation with
Glasgow Airport. The scheme shall be implemented as approved. 
Reason: In the interests of amenity and to avoid endangering the safe movement of
aircraft and the operation of Glasgow Airport through the attraction of birds and an
increase in the bird hazard risk of the application site. 
6. That prior to the commencement of development, details of the species, size and
locations of all new trees to be planted shall be submitted and approved in writing by
Renfrewshire Council as Planning Authority. This shall include full details of all trees
indicated on drawing 1598 / 01 Rev A and shall also confirm details of further
compensatory planting to be undertaken elsewhere within the golf course over and
above the details indicated on drawing 1598 / 01 Rev A. Thereafter, all trees shall be
planted within 12 months and any trees which die, are removed or become seriously
damaged or diseased within a period of five years shall be replaced in the next planting
season with others of a similar size and species, unless Renfrewshire Council as
Planning Authority gives written consent to any variation. 
Reason: In the interests of environment, amenity and the continuity of tree cover in the
area. 
7. That prior to the commencement of development, the applicant shall submit for the
written approval of Renfrewshire Council as Planning Authority, a long-term
Tree/Woodland Management & Maintenance Plan. The Tree/Woodland Management &
Maintenance Plan shall contain details on the monitoring of growth and condition of all
retained trees within the application site boundaries, as well as all new trees and
woodland planted in accordance with Condition 6. 
Reason: To ensure that works are undertaken to a satisfactory standard in the interests
of natural heritage. 
8. That all existing trees to be retained shall be protected through the construction phase
and future use of the sites in accordance with the recommendations set out in the
submitted Arboricultural Method Statement by Brindley Associates dated April 2021 and
in accordance with drawing 1598 / 01 Rev A.
Page 115 of 148

Page 120

Renfrewshire Council Planning and Climate Change Policy Board Page 4
Reason: To ensure that works are undertaken to a satisfactory standard in the interests
of natural heritage. 
9. Prior to the occupation of any of the dwelling units hereby approved a statement shall
be submitted for the written approval of Renfrewshire Council as Planning Authority
confirming all water management measures implemented in relation to the residential
development in accordance with the submitted Drainage Strategy and Flood Risk
Assessment by Dougal Baillie Associates, or as varied following the written approval of
the Planning Authority.
Reason: To ensure suitable water management mitigation measures in relation to the
development.
10. Prior to the occupation of the greenkeeping facility hereby approved a statement shall
be submitted for the written approval of Renfrewshire Council as Planning Authority
confirming that all water management measures in relation to the greenkeeping facility
have been implemented in accordance with the submitted Drainage Strategy and Flood
Risk Assessment by Dougal Baillie Associates, or as varied following the written
approval of the Planning Authority.
Reason: To ensure suitable water management mitigation measures in relation to the
development.
11. No development shall take place within the residential site until the developer has
secured the implementation of a programme of archaeological works in accordance with
a written scheme of investigation which has been submitted by the applicants, agreed
by West of Scotland Archaeology Service, and approved by the Planning Authority. 
Thereafter, the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological resources within
the residential site is undertaken to the satisfaction of the Planning Authority in
agreement with West of Scotland Archaeology Service. 
Reason: To ensure that any archaeological remains which may be disturbed can be
identified, excavated and recorded. 
12. That prior to development commencing within the residential site, two activity surveys
for bats shall be undertaken with respect to potential bat roosts at the outbuilding
immediately east of Newton Cottage identified in the Preliminary Ecological Appraisal by
Brindley Associates dated September 2020. Should any bat roosts be discovered, no
development shall take place prior to suitable mitigation measures being approved in
writing by Renfrewshire Council as Planning Authority. Development shall thereafter
only proceed in full accordance with these approved measures. 
Reason: To ensure the continued protection of existing bat populations in accordance
with European and national legislation. 
13. That prior to the occupation of any of the dwelling units hereby approved, the footpath
link as shown on drawing 17090-SK-15 Rev H shall have been completed. The path
shall be of a minimum width of 2.5 metres and a maximum gradient of 5%. 
Reason: To ensure that the development is appropriately accessible to sustainable
modes of travel.
Page 116 of 148

Page 121

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
14. That prior to the occupation of any of the dwelling units hereby approved the
specifications for the proposed lighting for the footpath as indicated on drawing 17090-
SK-15 Rev H shall have been submitted to and approved in writing by Renfrewshire
Council as Planning Authority and installed in accordance with the approved details. 
Reason: To ensure that the path is suitable for use in the interests of sustainable travel. 
15. That prior to the occupation of any of the dwelling units hereby approved, Newton
Avenue shall be upgraded in accordance with drawing 17090-SK-19 Rev A, entitled
‘Proposed Road Gradients’.                  
Reason: To ensure the development is appropriately accessible. 
16. That prior to the occupation of any dwelling units hereby approved, the following shall
be installed on the extended access on Newton Avenue:
(a) A handrail to the rear of the footway on both sides of Newton   Avenue
(b) A screed of high friction surfacing on Newton Avenue where excessive gradients
occur. 
Reason: To ensure the development is appropriately accessible. 
17. That prior to the occupation of any dwelling units hereby approved, details of the
improvements to be undertaken to the junction of Newton Avenue with Main Road shall
have been submitted and approved in writing by Renfrewshire Council as Planning
Authority and implemented in accordance with the approved details. 
Reason: In the interests of improving the safety and functioning of the road network in
the area. 
18. That parking provision within the completed residential development shall be provided
in accordance with the parking standards outlined in the National Roads Development
Guide. For the avoidance of doubt, garages are not to be counted towards this
provision. 
Reason: To ensure appropriate levels of parking provision within the residential
development. 
19. That prior to the occupation of the greenkeeping facility, full details of any lighting to be
installed at the facility and on the access road from Newton Drive shall have been
submitted to and approved in writing by Renfrewshire Council as Planning Authority and
installed in accordance with the approved details. 
Reason: In the interests of residential amenity. 
20. That prior to the occupation of the greenkeeping facility, a Noise Management Plan
outlining measures of good practice to be followed by all employees at the facility shall
have been submitted to and approved in writing by Renfrewshire Council as Planning
Authority and shall thereafter remain in place for the lifetime of the development. 
Reason: In the interests of residential amenity. 
Page 117 of 148

Page 122

Renfrewshire Council Planning and Climate Change Policy Board Page 6
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact Gwen McCracken on 07483 419705. 
Page 118 of 148

Page 123

Renfrewshire Council Communities, Housing and Planning Policy Board Page 1
Planning Application: Report of Handling 
Reference No. 20/0516/PP 
Agenda Item (? )
KEY  INFORMATION 
Ward: (8) Johnstone
South and Elderslie 
Applicant:
Elderslie Golf Club and
Dickie & Moore Homes 
Registered: 
07 September 2020 
RECOMMENDATION 
Grant subject to
conditions 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising 17 dwellinghouses and 8 flats with
associated infrastructure, parking and landscaping; and
erection of relocated greenkeeping facility with associated
storage 
LOCATION: Land East of Newton Cottage at Elderslie Golf
Club, Newton Avenue, Elderslie, Johnstone 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The residential development site is identified as a Housing
Land Supply Site under Policy P2 of the Adopted
Renfrewshire Local Development Plan (2021), while the site
of the proposed greenkeeping facility is identified under
Policy ENV 1 as green belt.  
• Representations have been received from 229 parties, of
whom 201 have written in support of the proposals and 28
have submitted objections. 
• There are no objections from any consultees. 
• The proposals are compliant with the relevant provisions of
the Adopted Renfrewshire Local Development Plan (2021),
subject to planning conditions including mitigatory measures
to control the loss of trees and the provision of a new path
link to ensure the site is accessible for all. 
Alasdair Morrison
Head of Economy &
Development
Item 12(b)
PACC140622 Page 119 of 148

Page 124

Renfrewshire Council Communities, Housing and Planning Policy Board Page 2 
RENFREWSHIRE COUNCIL
REPORT OF HANDLING FOR APPLICATION 20/0516/PP 
SITE ADDRESS  Land East of Newton Cottage at Elderslie Golf Club, Newton Avenue,
Elderslie, Johnstone
PROPOSAL  Erection of residential development comprising 17 dwellinghouses
and 8 flats with associated infrastructure, parking and landscaping;
and erection of relocated greenkeeping facility with associated storage
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks planning permission for the erection of a
residential development comprising 17 dwellinghouses and eight flats,
with associated infrastructure, parking and landscaping at Elderslie
Golf Course, Newton Avenue, Elderslie. Additionally, the application
seeks consent for a new relocated greenkeeping facility with
associated storage.
The residential element would be sited at the southern end of Newton
Avenue, which currently holds the golf club green keeper’s yard and
Newton Cottage. The access to the yard and cottage would be used
to enter the site and Newton Avenue would be extended.  Other than
the greenkeeping yard and associated buildings, the area of the
proposed residential development is largely wooded. The golf course
itself lies beyond the woodland to the east, south and west. A track
runs south and then west from the greenkeeping facility before
branching in two and accessing the golf course at separate locations.
The proposed units would be arranged around a new road which
would run perpendicular to the existing road, with a smaller additional
road branching off this to the south-east. The 17 houses would
comprise a mixture of five house types providing three, four and five
bedrooms. They would all be two-storey and would comprise 11
detached properties and 6 semi-detached properties. Two blocks of
two storey flats would be formed accommodating four flats in each
block. The buildings would all feature pitched roofs with grey concrete
roof tiles, while the walls would be predominantly finished in different
tones of red and brown facing brick, with sections also featuring a
smooth white render finish. 
The development would provide parking for 57 vehicles. This would
be provided on the basis of two for each unit, including the flats, with 7
visitor parking bays provided. The house plots would also
accommodate single garages. A sustainable drainage scheme is also
proposed for collecting surface water which includes a detention basin
to the north-east of the units.
The residential proposals would require the relocation of the existing
greenkeeping facility andit is proposed that the new greenkeeping
accommodation would be sited on an area of golf course land
approximately 180 metres north of the proposed housing. The new
facility would lie to the east of Newton Avenue and south of properties
on Main Road, with access taken from Newton Drive. 
Page 120 of 148

Page 125

Renfrewshire Council Communities, Housing and Planning Policy Board Page 3 
The proposed greenkeeping building would be of a rectangular
footprint measuring some 29.67 metres by 12.02 metres and would
feature a dual-pitched roof which would reach a maximum height of
approximately 7.3 metres. The principal elevation of the building
would face the access road to the west. The building would be
finished in green plastisol sheeting to its walls, with grey sheeting to
its roof. Internally the building would accommodate a workshop and a
small office, staffroom and sanitary facilities. Four external storage
bays would be sited adjacent to the building, while parking would be
provided for three cars, with further hard surfacing situated to the
front.
To ensure the residential development is accessible for all, the
applicants have added an illuminated path link to the housing site on
golf course land to the east of Newton Avenue. 
A supporting statement advises that the purpose of the development
is to generate funds for the golf club. The statement outlines that there
is a current trend of falling membership in golf in Scotland, resulting in
reductions in income and the recent closure of some clubs. The
statement further advises that the existing green keeping facility
requires essential renewal, while works are also required to the club
house and to the course itself. The statement adds that the
development would help secure the financial future of the golf club,
noting that its potential loss would have a severe effect on the
community and fabric of Elderslie.
SITE HISTORY Application No: 05/0106/PP
Description: Siting of temporary accommodation to provide toilets,
changing facilities, kitchen and office for ground staff.
Decision: Granted subject to conditions. 
CONSULTATIONS Children Services – No objection 
Communities & Housing Services (Environmental Protection
Team) – No objection subject to conditions 
Environment & Infrastructure Services (Roads) – No objection
subject to conditions 
Glasgow Airport Safeguarding - No objection subject to a condition 
National Air Traffic Services (NATS) – No objection 
Scottish Water - No objection 
Scottish Woodland Trust – No comments received 
SportScotland – No objection 
West of Scotland Archaeology Service (WoSAS) – No objection
subject to a condition
Page 121 of 148

Page 126

Renfrewshire Council Communities, Housing and Planning Policy Board Page 4 
REPRESENTATIONS  Representations have been received from 229 separate parties, 201
of whom have written in support of the proposals and 28 who have
submitted objections. 
The letters of support comment that the proposals would address a
shortage of housing in the area and help to secure the finances of the
golf club, which is important to the community and local economy of
the area. It is further commented that the golf club finances are at risk,
reflecting a downward trend in golf club finances throughout the
country. It is commented that the development would generate
welcome funds to secure necessary upgrades to the clubhouse, the
required renewal of the greenkeeping accommodation and other
improvements to the course. 
It is further stated that the proposals would improve infrastructure and
access at Newton Avenue, including to Newton Cottage, and that the
new houses would provide economic opportunity for local business,
potential additional members to the golf club and Council tax revenue.
Letters of support also state that the development proposals are
proportionate for their location. 
In terms of the objections received, the substance of these may be
summarised are as follows: 
1. The loss of green belt land, with objection also raised to the
allocation of the site for housing. It is commented that there is
no shortfall in the effective housing land supply; that there are
ample alternative brownfield sites which should be prioritised;
and that the loss of green belt to housing sets a precedent for
further future residential development, potentially of the whole
golf course.
2. Loss of long-established, mature, native woodland to the
detriment of amenity and contrary to the climate emergency
agenda. It is also commented that the quality of the woodland
is high and not recognised by the applicants.
3. Adverse impacts on access to greenspace and associated
detriment to physical and mental wellbeing.
4. Adverse impacts on biodiversity and wildlife, including loss of
habitat and harm to protected species, bird species, moth
species and deer.  
5. The trees subject to felling have previously been planted using
public money from Scottish Forestry’s woodland grant scheme
initiative. 
6. The tree surveys are out of date and show the position of the
proposals differently to the application drawings. 
Page 122 of 148

Page 127

Renfrewshire Council Communities, Housing and Planning Policy Board Page 5 
7. Japanese Knotweed and Himalayan Balsalm are identified in
the tree and ecology reports as being present. It is required
that these are treated and eradicated prior to any
development.
8. Whether the proposals have been subject to an Environment
Impact Assessment.
9. The site description is inaccurate in referring to “Land to East
of Newton Cottage”. 
10. Traffic impact, including concerns regarding the safety of
pedestrians, the build-up of further traffic at the junction of
Newton Avenue with Main Road, the need for the installation
of traffic signals and road safety concerns in relation to the
proposed greenkeeping facility. 
11. Impacts on air quality.
12. The access into the residential development being overly
steep and hazardous, particularly during icy conditions.
13. The density of the proposed residential units being excessive
and the proposed flats being incompatible with the character of
the area.
14. The proposed units being visually unappealing, out of
character and incongruous to the character of other houses in
the area.
15. The impact of the proposed units on the privacy and amenity
of existing houses in the area.
16. Concerns regarding flooding and drainage issues, including
concerns that ground conditions are insufficient to support
drainage from the proposals and that the proposals could
increase risk to other nearby properties. Concerns are also
raised that no application has been made to Scottish Water to
connect to their apparatus. 
17. Concerns regarding the proposed detention basin with respect
to safety, overflows and vermin.
18. Concerns regarding noise and disturbance resulting from the
proposed relocated greenkeeping facility. It is also in this
regard contended that the greenkeeping facility constitutes a
“change of use” to light industrial use.
19. Concern that the greenkeeping facility and associated
equipment and materials will be untidy and not adequately
maintained. 
Page 123 of 148

Page 128

Renfrewshire Council Communities, Housing and Planning Policy Board Page 6 
20. Lack of detail regarding the greenkeeping facility including its
finishing materials, site levels, screening, lighting and matters
relating to its operation, equipment and issues of access
around the facility and to and from the golf course
21. Concerns regarding odours from the greenkeeping facility.
22. The greenkeeping facility being out of proportion to
neighbouring bungalows.
23. Clarification sought regarding the purpose and position of a
tank relating to the greenkeeping facility.
24. Concern that no site investigation report has been submitted.
25. The economic case put forward by the Golf Club that the
proposals are necessary to secure the financial future of the
club are questioned in view of current membership waiting lists
and it is contended that short term economic gain is being
prioritised before long term sustainability. It is also pointed out
that support for the proposals are from golf club members who
do not generally live in the vicinity.
26. Noise, disruption and safety issues during construction.
27. The path construction and lighting resulting in loss of
greenspace and wildlife habitat.
28. The potential for the path to attract anti-social and criminal
behaviour, including burglaries, and a reopening of access to
motorcycles and other unauthorised vehicles on the course.
29. Concerns regarding the impact of the path and lighting on the
amenity of nearby houses.
30. Concerns regarding the maintenance of the path.
31. Concerns regarding how the access from Newton Drive to the
path would be designed and managed, including the footways
on Newton Drive and the potential impact of any new
streetlighting on Newton Drive.
32. Concerns regarding users of the path being struck by golf balls
and the golf club not accepting liability for injuries.
33. The carbon footprint impact of constructing and servicing the
path. 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021) 
Policy P1 – Renfrewshire’s Places
Policy P2 – Additional Housing Sites
Policy P3 – Housing Mix and Affordable Housing
Policy P6 – Open Space
Policy ENV 1 – Green Belt
Page 124 of 148

Page 129

Renfrewshire Council Communities, Housing and Planning Policy Board Page 7 
Policy ENV 2 – Natural Heritage
Policy I1 – Connecting Places
Policy I3 – Flooding and Drainage
Policy I7 – Zero and Low Carbon Buildings 
Draft Proposed New Development Supplementary Guidance (2019) 
Delivering the Places Strategy: Creating Places; Green Network and
Infrastructure; and Open Space.
Delivering the Infrastructure Strategy: Connecting Places; Provision
for Waste Recycling in New Developments; Flooding and Drainage;
and Renewable and Low Carbon Energy Developments.
Delivering the Environment Strategy: Acceptable Forms of
Development in the Green Belt; Green Belt Development Criteria;
Natural Heritage; Trees, Woodland and Forestry; Biodiversity; Noise;
and Contaminated Land. 
Material considerations
Renfrewshire's Places Residential Design Guide March 2015 
PLANNING
ASSESSMENT
Residential Development 
The application is identified in the Local Development Plan (2021) as
a housing land supply site which is suitable for delivering up to 25
units where Policy P2 applies.   
As such, the proposed residential development of 25 units accords in
principle with Policy P1 and Policy P2 of the adopted Local
Development Plan in contributing towards the range and choice of
sites necessary to support Renfrewshire’s housing need and demand.
In order to consider the detail of the proposed residential
development, Policy P1 requires that the proposals be assessed
against the criteria set out in the draft New Development
Supplementary Guidance and the associated Renfrewshire’s
Places Residential Design Guide. The main issues of consideration
in this regard are assessed as follows: 
Context and Character
The residential development would be contained within an area to the
south of the existing housing at Newton Avenue, Newton Drive and
Roundhill Drive and follows a logical extension to the village envelope,
with Newton Cottage retained to the south and the wider area
contained by the woodland edge and the golf course to the west,
south and east. The south-east portion of the development is currently
occupied by the existing greenkeeping facilities and the built form is
therefore already established within this portion of the site. 
The existing streets to the north are characterised by one and two-
storey detached and semi-detached houses of traditional character
within a leafy setting, with good levels of tree cover, hedging and other
planting. 
Page 125 of 148

Page 130

Renfrewshire Council Communities, Housing and Planning Policy Board Page 8 
Tree cover would be retained around the edges of the proposed
development, particularly towards the south and east, with street tree
planting and additional proposed planting around and beyond the
perimeters of the development ensuring that this context would be
maintained. The development would be contained well away from any
fairways and there would appear little prospect for further incremental
development in the future given the containment of the site in relation
to the surrounding woodland and golf course layout. 
The development also provides an appropriate housing mix in
accordance with Policy P3 of the Local Development Plan, with eight
flats proposed containing two bedrooms each and 17 houses
comprising five different house types containing three, four or five
bedrooms. 
Access and Connectivity
Policy I1 of the adopted Renfrewshire Local Development Plan
(2021) states that development proposals require to ensure
appropriate provision and accessibility. Proposals which give priority
to sustainable modes of transport and have no significant impact on
the safe and efficient operation of the local or trunk road network will
be supported. 
In this case, the Council’s Environment and Infrastructure Service
(Roads) initially objected to the residential development due to the
steepness of the access from Newton Avenue. While the applicants
have committed to alterations to widen and upgrade the access at the
top of Newton Avenue to an adoptable standard, with improvements
undertaken to facilitate safe vehicular access and to aid pedestrians,
the gradient of a section of the footway would still be above that
acceptable to support all modes of sustainable transport, particularly
during adverse weather, such as wheelchairs and prams. As a result,
the development would not comply with the principles of the National
Transport Strategy for Scotland or the emerging National Planning
Framework (NPF4) which promote a hierarchy of transport modes in
which walking and wheeling are to be given greatest priority and
private car use lowest priority after cycling, public transport and
taxis/shared transport.   
Therefore, to make the development accessible for all, the applicants
have added the proposal for a path link on golf course land to the east
of houses on Newton Avenue. The path would provide a route at a
consistently shallow 5% gradient running from the eastern end of
Newton Drive to the north east corner of the residential development.
The development now meets Environment and Infrastructure Service
(Roads) requirements in terms of accessibility. Further consideration
of the path is undertaken later in this assessment. 
Elsewhere, suitable access would be retained into the woodland to the
west and south of the development, connecting with other paths within
the golf course grounds. This would include a new path link from the
west of the development. 
Page 126 of 148

Page 131

Renfrewshire Council Communities, Housing and Planning Policy Board Page 9 
These links, together with the proposed path link from Newton Drive,
result in an acceptable level of permeability in providing connections
to other areas of greenspace and additional path networks. Newton
Avenue itself is well-connected to local services and amenities, with
the National Cycle Network also accessible from Main Road. Wallace
Primary School is approximately 1.4 kilometres away following the
existing footways, with a shorter route also possible via informal paths
through the golf course.
A transport statement has been submitted which considers the impact
of additional traffic from the development on the existing road network.
This provides data on the likely number of road journeys generated by
the development at peak times. The statement concludes that while
vehicles do often require to wait some to turn out of the junction, even
if the proposed development should generate twice as much traffic as
estimated, the junction would not be operating at full capacity and
signalisation would not be required. However, the assessment does
consider that the kerbs at the junction should be built out and the road
markings moved some 1.41 metres forward to improve visibility at the
junction. The Environment and Infrastructure Service (Roads) have
raised no adverse comments regarding these findings, subject to a
condition to ensure the improvements to the junction are undertaken
as outlined..
Layout and Built Form
The development layout would contain active frontages onto the
roads, with the open space also well overlooked. A narrow, wooded
buffer ranging between 4.3 and 7.6 metres wide would be retained
between the proposed plots and the nearest existing properties on
Newton Avenue to the north and the impact on the general outlook of
the streetscene on Newton Avenue is not considered to be adverse.
Grass verges and a small area of open space within the centre of the
site would also contribute to the aesthetic character of the
development. 
The mass of the buildings, in all being two-storey would be in keeping
with a typical edge of settlement residential development and is
considered acceptable for the area, which supports both one and two
storey housing. Whilst the new units would be elevated in relation to
the existing houses to the north, their rear windows would be an
acceptable distance of more than 13 metres from the nearest gardens
and more than 22 metres from the nearest neighbouring windows
facing south. 
These aspects are sufficient to ensure no unacceptable loss of
privacy, outlook or natural light afforded to the existing houses. The
layout is also sufficiently distanced and arranged in relation to the one
and a half storey Newton Cottage to preserve the privacy and amenity
of its inhabitants and to appear acceptably in proportion. 
The eight flats would essentially constitute “four in a block” properties
and the mass of these buildings would not appear significantly out of
context. 
Page 127 of 148

Page 132

Renfrewshire Council Communities, Housing and Planning Policy Board Page 10 
The height of the blocks, at approximately 9.7 metres, would not be
significantly higher than the 9.3 metres height of the highest of the five
other house types proposed. Given the small number of flats
proposed, it is not considered that these would be incongruous with
the wider area and would add to the range of accommodation offered
by the development, as promoted by Policy P3 of the Local
Development Plan. 
The plots of the proposed units are themselves relatively modest, but
provide sufficiently sized rear gardens for amenity, whilst the layout
also ensures appropriate levels of privacy between properties.The
front curtilages of the properties would be open, with grass gardens,
verges and different surfacing materials contributing to the active
street frontage. 
Whilst the plot sizes are smaller than many other plots on Newton
Avenue and adjacent streets, they are not dissimilar to other more
recent developments, including the housing at the west end of Newton
Drive. The density of the development is not in this respect excessive,
with the number of units proposed according with the number deemed
appropriate in the adopted Renfrewshire Local Development Plan
(2021). 
Environment and Community
Policy ENV 2 of the Renfrewshire Local Development Plan states that
development proposals should enhance access to Renfrewshire’s
natural environment and minimise any adverse impacts on habitats,
species, network connectivity or landscape character. 
In this case the proposals would entail the removal of a an area of
woodlandincluding trees at varying stages of maturity.   It should be
noted that the trees affected by the proposed development are not
subject to a tree protection order (TPO).  
Where woodland is removed in association with development, the
draft New Development Supplementary Guidance states that
developers will be expected to provide compensatory planting, in line
with the Scottish Government’s control of woodland policy. It is further
observed from a tree survey submitted by the applicants that young
and semi-mature trees within the western part of the site were planted
with grant funding provided by the Forestry Commission (now Scottish
Forestry) through their Woodland Grant Scheme. Non-compliance
with any terms of this grant would be a matter for Scottish Forestry. 
Representees have also noted that the tree survey was undertaken in
2017. However, it is considered that this, in conjunction with various
site visits has allowed the development’s impact on trees to be
properly assessed. In this regard, the woodland is noted to
accommodate trees of varying quality, including some good quality
specimens, many of which are native broadleaf species.
Notwithstanding the value of individual trees, the woodland also
contributes a very pleasant green space which is accessible to nearby
residents. 
Page 128 of 148

Page 133

Renfrewshire Council Communities, Housing and Planning Policy Board Page 11 
As such, the proposals do not fully accord with Policy ENV 2;
however, it is considered that the removal of the trees to
accommodate the development would on balance be acceptable
subject to appropriate compensatory planting being undertaken. This
takes into account trees being retained around the edges of the site
and the area of tree felling constituting a small portion of the overall
extent of woodland cover within the wider golf club grounds. 
In terms of compensatory planting, the applicants propose to plant
trees within the proposed development, including street trees, and to
plant additional woodland around the edges of the site and outwith the
site boundary within golf course land. This will help mitigate the tree
loss, while the retained tree cover, particularly to the south and east,
will protect the landscape setting by limiting views of the development.
The new planting and existing tree cover round the site edges will
continue to offer corridors for wildlife, along with the further tree and
woodland cover throughout the golf course. 
The applicants have submitted an arboricultural method statement
which outlines protective measures for the retained trees during
development and offers an indicative schedule for compensatory
planting. To maximise the benefit of the retained and new areas of
woodland, it is considered appropriate to condition the submission and
approval of a woodland management plan to preserve and enhance
the retained and new woodland areas and also to condition further
compensatory planting within the wider golf course. 
An ecological appraisal has been submitted, which outlines the
findings of surveys undertaken on site. This observes the presence of
a shed adjacent to the main existing greenkeeping buildings which
offers “moderate” potential for roosting bats. The report therefore
advises that two “activity surveys” should be undertaken prior to works
on this building, or any heavy engineering within 30 metres of the
building. As two of the houses and one of the flat blocks would be
within 30 metres of this building, it is appropriate to condition these
further surveys. The woodland is also found to offer potential as a
commuter corridor for foraging bats but any roosting is considered to
be limited to summer months, with the potential for hibernating bats
rated as ‘negligible’. Signs of grey squirrel and deer are also observed
but are not protected species, while a range of bird species have also
been observed. 
It is appropriate in accordance with common practice that any
treeworks should only be undertaken outwith the bird nesting season.
As noted, the retention of tree cover around the site edges and
elsewhere within the golf course, together with compensatory planting
are considered appropriate in mitigating these impacts. The ecological
appraisal also recommends species appropriate for understorey
planting to enhance the biodiversity appeal of these areas. This could
be included within a woodland management plan as referenced
above. 
Page 129 of 148

Page 134

Renfrewshire Council Communities, Housing and Planning Policy Board Page 12 
Glasgow Airport Safeguarding have additionally requested that should
consent be granted, a standard condition requiring the submission
and approval of a soft landscaping strategy should be applied. The
purpose of this would be to ensure no adverse impacts in terms of
certain bird species which could in turn potentially affect passing
aircraft. A condition on this basis is therefore appropriate.          
In terms of flooding and drainage, the applicants have submitted a
drainage assessment. This outlines in detail a proposal to employ a
sustainable drainage system (SuDS) in order to collect and treat
surface water from the development, with the aid of a detention basin,
and to direct flows in a controlled matter towards the Lexwell Burn to
the east. The document proposes that foul water would be directed to
the existing combined sewer on Newton Avenue. Scottish Water have
confirmed no objection to the proposals, but it should nevertheless be
noted that permission to connect to their apparatus is a separate
process which the applicants would still have to pursue following any
granting of planning permission. A flood risk assessment has also
been submitted which concludes that the housing development would
not be at risk of flooding given its elevated position. 
In view of the above, the residential proposals are considered to
comply with Policy I3 of the adopted local development plan and the
associated supplementary guidance. 
Buildings and Design
The proposed dwellings are of an appropriate contemporary design
which is considered to bein keeping with the character of the built
environment of the wider area. The exact specifications of proposed
finishings can be the subject of a suitable planning condition in the
event that planning permission is granted. 
Policy I7 requires that new housing developments should
demonstrate a commitment to technology which produces low or no
amounts of carbon dioxide emissions, to reduce the predicted
emissions by at least 15% below 2007 building standards. In response
to this, the applicants have submitted a Low Carbon Development
Statement which contains a range of measures they would intend to
pursue in order to comply with Policy I7 and with relevant building
regulations. These include thermally modelled construction details,
Mechanical Ventilation Heat Recovery systems, air-tightness testing,
installation of Air Source Heat Pumps and space heating controls
within underfloor heating. These measures are considered appropriate
in meeting the requirements of Policy I7. 
Greenkeeping Facility 
The site of the proposed greenkeeping facility is designated both as
green belt and as open space in the adopted Renfrewshire Local
Development Plan (2021), where Policy ENV 1 and Policy P6 apply
respectively. 
Page 130 of 148

Page 135

Renfrewshire Council Communities, Housing and Planning Policy Board Page 13 
Policy ENV 1 seeks to maintain the identity of settlements, protect and
enhance the landscape setting of an area and protect and promote
access opportunities for open space. Proposals within the green belt
will only be considered acceptable where they are compatible with the
draft New Development Supplementary Guidance. 
The draft New Development Supplementary Guidance lists the types
of development which are acceptable forms of development in the
green belt. This includes recreational and commercial uses
compatible with an agricultural or natural environment setting. As the
greenkeeping facility relates to the operation of an established golf
course, the principle of this being located within green belt is
acceptable, subject to assessment against the Green Belt
Development Criteria. The main issues of consideration in this regard
are assessed as follows: 
Nature Conservation, Trees and Landscape Setting
The area is not subject to any formal environmental designations. The
development would be sited on an area of low-lying grassland
featuring a range of mostly young and semi-mature trees, with
additional mature trees providing a backdrop to the north and west. A
tree survey submitted with the application outlines that trees were
planted within this area under the same woodland grant scheme as
some of the trees to be removed from the residential site. Again, as
with the residential site, non-compliance with the terms of any grant
would be a matter for Scottish Forestry. 
The majority of trees would be retained but a number of young and
semi-mature trees would require to be removed in order to
accommodate the footprint of the greenkeeping building, the storage
area, access and hard surfacing. Good tree cover would be retained
between the development and the nearest houses to the north and
west, as well as to the east. This, together with the muted dark green
and dark grey colours of the proposed building, would enable it to
blend in with its landscape setting. Notwithstanding the tree loss,
additional compensatory planting can be conditioned as outlined
above with respect to the proposed residential development. 
The ecological survey for the area notes no signs of any protected
species. Whilst the development would cut into this area of natural
environment, the wider areas of wild grass and tree cover largely
surrounding the proposed development would be retained and it is not
considered that the overall impact on nature conservation would be
significantly adverse. 
Siting and Design
The greenkeeping building would be of a conventional design, similar
to the existing building to the south of Newton Avenue. It would have a
rectangular footprint and feature a dual-pitched roof and finishing
materials appropriate for its purpose, comprising green and grey
plastisol sheeting. 
Page 131 of 148

Page 136

Renfrewshire Council Communities, Housing and Planning Policy Board Page 14 
The building would be set well back from the access from Newton
Drive and would be approximately 25 metres from the gardens of the
nearest houses at Main Road to the north and 70 metres from the
nearest gardens on Newton Avenue to the west. The storage bays
would be arranged perpendicular to the greenkeeping building and
would be approximately 25 metres and 40 metres from the nearest
gardens to the north and west respectively. Given these distances, the
proposals are not considered to significantly affect the amenity of the
nearby housing in terms of outlook, privacy or loss of light. Tree cover
would also help to screen the building. The height of the building, at
approximately 7.3 metres, would not appear out of proportion with the
nearest houses, including bungalows at Main Road to the north. 
Noise and Disturbance
A Noise Impact Assessment has been submitted and considered
acceptable by the Communities and Housing Service (Environmental
Protection Team) following clarification on some minor details. 
As part of this process, the greenkeepers have provided details of the
operations that would take place at the facility and in its vicinity. They
state that the hours of operation would typically be 06:00 to 14:00
hours Monday to Friday and 05:30 to 13:30 Saturdays and Sundays in
the summer and 07:00 to 15:00 hours seven days a week in the
winter. 
Vehicles used would include a number of grass-cutting machines,
while a tractor and trailer and a 4x4 vehicle would also be used for
loading, unloading and transporting equipment. A digger would be
used one day a week for a period of up to 20 minutes to load the
trailer with sand and gravel. The greenkeepers further advise that at
the beginning of the day, vehicles would be started within the building
and run at a low level, prior to exiting directly on to the golf course to
the south. They also state that the vehicles do not require reverse
alarms and that intense periods of activity at the premises are limited,
with most work being undertaken out on the course and preparation
works undertaken at the end of a typical day to avoid significant
prolonged early morning activity at the facility prior to going out on to
the course. Two close boarded fences are also proposed to reduce
noise levels to the north and west. 
Whilst the Communities & Housing Service (Environmental Protection
Team) has accepted the findings of the noise impact assessment and
therefore has no objections, the acoustic consultant employed by the
applicants has raised the possibility of a “noise management plan”
which could be an active document which all greenkeeping staff are
trained to follow. This would include measures of best practice in
terms of matters such as idling vehicles and trailers being loaded
within screened areas. To provide greater assurance that noise in
relation to the facility would be appropriately managed, it is considered
prudent to apply a condition requiring the approval and
implementation of a management plan of this nature. 
Page 132 of 148

Page 137

Renfrewshire Council Communities, Housing and Planning Policy Board Page 15 
Odours
Significant odours are not anticipated in terms of the activities that
would operate from the facility, while it is further noted that the
Communities & Housing Service (Environmental Protection Team)
have raised no adverse comments in terms of odours. 
Traffic and Access Infrastructure
Access to the facility can easily be taken from Newton Drive, with
space provided for turning vehicles to the front of the facility. The
Council’s Environment and Infrastructure Service (Roads) have raised
no adverse comments in relation to this arrangement. Non-vehicular
access to the surrounding woodland would be retained, while golf
course vehicles would be able to directly access the golf course to the
south of the facility. 
Flooding and Drainage
Anecdotal evidence submitted by representees suggests that the area
of the proposed greenkeeping facility is prone to localised flooding. A
flood risk assessment submitted on behalf of the applicants also notes
the potential for pluvial flooding in the area, leading to ponding at the
north end of the site. The assessment recommends that the building
should be positioned at last 16.4 metres AOD (above ordnance
datum) to not be at risk in this regard. The document also
recommends post development overland flows as part of the final
development solution, with land drainage installed along the north
boundary to prevent additional ponding. It is considered that these
details could be subject to a planning condition. 
The submitted drainage assessment proposes that the access road
serving the greenkeeping facility should be made of permeable
materials and that surface water from the building roof be collected
and directed to a soakaway to limit additional overland flows. 
It is considered in this respect that the final details of the above can be
appropriately addressed by condition. Further to this, it is observed
that the greenkeeping facility is of a footprint that on its own would not
typically require the submission of a Drainage Impact Assessment.
This presupposes that the impacts of the facility should not be
significantly adverse, but it is in any case appropriate to ensure that
the final technical details are suitably effective. 
Open space
Policy P6 of the Local Development Plan safeguards designated
areas of open space from development. As the designated open
space area in this case is a golf course and the proposed
greenkeeping facility would only intrude on a small portion of the wider
open space, whilst also relating to its continued function as a golf
course, the development is considered acceptable in terms of Policy
P6.   
Page 133 of 148

Page 138

Renfrewshire Council Communities, Housing and Planning Policy Board Page 16 
Footpath 
The proposed footpath is considered necessary by the Environment
and Infrastructure Service (Roads) in order to provide sustainable
access for all people. As with the greenkeeping facility site, this area
is designated in the adopted Local Development Plan as both green
belt and open space under Policy ENV 1 and Policy P6 respectively. 
The draft New Development Supplementary Guidance categorises
new active travel routes as acceptable green belt development and
the path is therefore compliant in principle with Policy ENV 1. In terms
of the Green Belt Development Criteria, the path would not impact
significantly on existing natural heritage or wildlife habitats. 
In terms of landscape setting, the most notable visual impact would be
the proposed lighting. Initial discussions have taken place with the
developers and the Council’s Environment and Infrastructure Service
(Roads) and it is considered that the exact specifications of the
lighting can be secured by condition. It is considered that the lighting
can be designed to minimise the visual intrusion on the landscape and
amenity of the residents in terms of potential glare, whilst also
ensuring the path and adjacent areas of land are suitably illuminated
in the interests of safety. 
It is noted that a desire line cuts through this area and dogwalkers
have been seen using this during site visits. The new path would
therefore formalise a route through this area. The path itself would be
set back from the rear boundaries of the properties on Newton
Avenue, a minimum of 5.5 metres and would maintain a consistent
low gradient of 5%. 
The houses on the east side of Newton Avenue are noted to have
gardens with above average length and as such the path would not
raise unacceptable passive overlooking of any windows; however, it
would still be close enough to the properties to be overlooked from
first floor windows. This should enable users of the path to feel safe,
whilst also acting as a deterrent to potential anti-social or criminal
behaviour. 
As an active travel route running through the open space, the
proposed path supports Policy P6 by providing enhanced access to
an area of green space, as well as providing a sustainable option to
ensure the proposed residential development is accessible for all, as
required by national guidance and Policy I1 of the adopted
Renfrewshire Local Development Plan (2021).   
Representations
In response to the objections not addressed in the above assessment,
the following comments are made: 
(6) As noted in the assessment, the tree surveys are considered to
provide sufficient information on the quality of the trees. 
Page 134 of 148

Page 139

Renfrewshire Council Communities, Housing and Planning Policy Board Page 17 
As the surveys constitute supporting documents rather than drawings,
the differing locations of the buildings shown in the surveys is not
relevant to the formal assessment.
(7)  The Wildlife and Countryside Act 1981 Act (as amended) confers
responsibility on landowners to address invasive species such as
Japanese Knotweed and Himalyan Balsalm spreading in the wild.
Whilst this is not subject to planning control, the golf course are aware
of their duties in this regard.
(8) The proposals do not come under the categories of development
listed under either Schedules 1 or 2 of the Town and Country Planning
(Environmental Impact Assessment) (Scotland) Regulations 2017. As
such, an Environmental Impact Assessment was not required in this
case.
(9) The site locations are clearly mapped in the neighbour notification
letter issued to neighbours and in the application drawings, when
viewed. It is also noted that the applicants held a pre-application event
to publicise the proposals. As such, there is no ambiguity regarding
the land to which the application relates.
(17) The safety and operation of the proposed detention basin would
be the responsibility of the developer in accordance with relevant
technical guidance.
(18) The greenkeeping facility constitutes an ancillary use which
supports the overall functioning of the golf course, but the planning
assessment has in any case considered the facility in the context of its
operations and activities.
(19) The greenkeeping facility is well-contained and suitably distanced
from the nearest houses that any issues of untidiness or maintenance
would not significantly affect the amenity of neighbouring land uses.
(23) The applicants have clarified that the proposed tank would be a
water tank which would be positioned immediately to the south of the
greenkeeping facility. This is depicted on the application drawings.
(24) The Communities and Housing (Environmental Protection Team)
have advised that significant contamination is unlikely but have
recommended conditions requiring site investigation of the proposed
housing site and, if necessary, mitigation measures to be undertaken
and verified. Appropriate conditions can be attached to control these
matters.
(25) Whilst it would appear likely that the parties who have written in
favour of the proposals will be golf club members, there is no
restriction on who may comment on an application. In terms of the
economic case put forward by the applicant, it is noted that some of
the representees objecting to the development question this, noting
that there is a current waiting list for membership. 
Page 135 of 148

Page 140

Renfrewshire Council Communities, Housing and Planning Policy Board Page 18 
It is not within the scope of the planning assessment to determine or
speculate on the extent to which the development is, or is not,
required for financial means. The provisions of the Local Development
Plan must take primacy in consideration of the development.
Notwithstanding the financial position of the golf club, it is
acknowledged that the club is essential to the local community and
any potential loss of the club would have significant implications for
the surrounding area.
(26) Issues of noise, disruption and safety during construction are not
material planning considerations.
(28) The potential for the path attracting anti-social or criminal
elements is discussed in the assessment. In terms of the path making
it possible for motorcycle and other such vehicles to access the
course, this would be a matter for the golf club to address. 
(30) The future maintenance of the path can be subject to a condition. 
(31) As noted, the final design of the route and lighting can be subject
to a condition. Newton Drive itself is adopted and the addition of any
lighting can be sensitively designed in consultation with the
Environment and Infrastructure Service (Roads).
(32) The path would provide a formal route in place of an existing
established desire line. Liability is not a planning matter. 
(33) This is considered to be outweighed by the longer-term
sustainability of the path providing non-motorised access to the
development for all. 
Conclusion
It is considered that the residential proposals would deliver a high-
quality development within an attractive setting which would support
housing demand in the area. The new greenkeeping facility would be
sensitively sited, while the proposed path link would support the
sustainability of the residential development by ensuring it is suitably
accessible for all people. 
The proposal’s impacts have been fully considered in the above
assessment , particularly in terms of the loss of woodland and green
space. The site is designated as part of the housing land supply within
the adopted Renfrewshire Local Development Plan (2021) and it has
been identified as suitable for the delivery of 25 units, together with
appropriate mitigation for the tree loss to include compensatory
planting; protection of retained trees during development; and longer-
term management measures through a woodland management plan,
it is not considered that these impacts should deter from the
application receiving a favourable recommendation. 
In view of the foregoing, it is therefore recommended that this
application should be granted subject to conditions.
Page 136 of 148

Page 141

Renfrewshire Council Communities, Housing and Planning Policy Board Page 19 
RECOMMENDATION Grant Subject to Conditions 
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions
1. No development shall commence on the residential site until written
approval of: 
(a)  a Site Investigation report (characterising the nature and extent of any
soil, water and gas contamination within the site); and, if remedial works
are recommended therein 
(b) a Remediation Strategy and Implementation Plan identifying the
proposed methods for implementing all remedial recommendations
contained within the site investigation report 
all prepared in accordance with current authoritative technical guidance,
have been submitted to and approved in writing by Renfrewshire Council as
Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
2. That prior to the occupation of any residential unit on the site: 
(a)  a Verification Report confirming completion of the works specified within
the approved Remediation Strategy and Implementation Plan; or 
(b)  where remediation works are not required but soils are to be imported to
site, a Verification Report confirming imported materials are suitable for
use 
shall be submitted to and approved in writing by Renfrewshire Council as
Planning Authority. Verification Reports shall not be submitted on a phased
basis unless first agreed in writing with the Planning Authority. 
Reason: To demonstrate that works required to make the site suitable for
use have been completed. 
3. That, prior to the erection of any of the residential units or greenkeeping
facility hereby approved, a detailed schedule of the proposed external
finishes for each building, together with a plan and schedule of the surface
treatments to be used on all roads and footpaths shall be submitted for the
written approval of Renfrewshire Council as Planning Authority. 
Page 137 of 148

Page 142

Renfrewshire Council Communities, Housing and Planning Policy Board Page 20 
Thereafter, the buildings, roads and footpaths shall be constructed only in
accordance with such details as may be approved to the satisfaction of
Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area. 
4. That, prior to the commencement of the development, details of all
boundary treatments to be formed shall be submitted for the written
approval of Renfrewshire Council as Planning Authority. Thereafter, all
boundary fences and walls as may be approved relating to or adjacent to
each plot shall be erected prior to the occupation of the building within that
plot to the satisfaction of Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area. 
5. No development shall take place until full details of soft and water
landscaping works have been submitted to and approved in writing by the
Planning Authority. Details must comply with Advice Note 3 ‘Potential Bird
Hazards from Amenity Landscaping & Building Design’ (available at
www.aoa.org.uk/publication/safeguarding.asp). These details shall include: 
• Drainage details including SUDS – Such schemes must
comply with Advice Note 6 ‘Potential Bird Hazards from
Sustainable urban Drainage Systems (SUDS) (available at
www.aoa.org.uk/publications/safeguarding.asp ). 
No subsequent alterations to the landscaping scheme are to take place
unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as
approved. 
Reason: In the interests of amenity and to avoid endangering the safe
movement of aircraft and the operation of Glasgow Airport through the
attraction of birds and an increase in the bird hazard risk of the application
site. 
6. That prior to the commencement of development, details of the species,
size and locations of all new trees to be planted shall be submitted and
approved in writing by Renfrewshire Council as Planning Authority. This
shall include full details of all trees indicated on drawing 1598 / 01 Rev A
and shall also confirm details of further compensatory planting to be
undertaken elsewhere within the golf course over and above the details
indicated on drawing 1598 / 01 Rev A. Thereafter, all trees shall be planted
within 12 months and any trees which die, are removed or become
seriously damaged or diseased within a period of five years shall be
replaced in the next planting season with others of a similar size and
species, unless Renfrewshire Council as Planning Authority gives written
consent to any variation. 
Reason: In the interests of environment, amenity and the continuity of tree
cover in the area. 
Page 138 of 148

Page 143

Renfrewshire Council Communities, Housing and Planning Policy Board Page 21 
7. That prior to the commencement of development, the applicant shall submit
for the written approval of Renfrewshire Council as Planning Authority, a
long-term Tree/Woodland Management & Maintenance Plan. 
The Tree/Woodland Management & Maintenance Plan shall contain details
on the monitoring of growth and condition of all retained trees within the
application site boundaries, as well as all new trees and woodland planted
in accordance with Condition 6. 
Reason: To ensure that works are undertaken to a satisfactory standard in
the interests of natural heritage. 
8. That all existing trees to be retained shall be protected through the
construction phase and future use of the sites in accordance with the
recommendations set out in the submitted Arboricultural Method Statement
by Brindley Associates dated April 2021 and in accordance with drawing
1598 / 01 Rev A. 
Reason: To ensure that works are undertaken to a satisfactory standard in
the interests of natural heritage. 
9. Prior to the occupation of any of the dwelling units hereby approved a
statement shall be submitted for the written approval of Renfrewshire
Council as Planning Authority confirming all water management measures
implemented in relation to the residential development in accordance with
the submitted Drainage Strategy and Flood Risk Assessment by Dougal
Baillie Associates, or as varied following the written approval of the
Planning Authority. 
Reason: To ensure suitable water management mitigation measures in
relation to the development. 
10. Prior to the occupation of the greenkeeping facility hereby approved a
statement shall be submitted for the written approval of Renfrewshire
Council as Planning Authority confirming that all water management
measures in relation to the greenkeeping facility have been implemented in
accordance with the submitted Drainage Strategy and Flood Risk
Assessment by Dougal Baillie Associates, or as varied following the written
approval of the Planning Authority. 
Reason: To ensure suitable water management mitigation measures in
relation to the development. 
11. No development shall take place within the residential site until the
developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation
which has been submitted by the applicants, agreed by West of Scotland
Archaeology Service, and approved by the Planning Authority.  Thereafter,
the developer shall ensure that the programme of archaeological works is
fully implemented and that all recording and recovery of archaeological
resources within the residential site is undertaken to the satisfaction of the
Planning Authority in agreement with West of Scotland Archaeology.
Service.
Page 139 of 148

Page 144

Renfrewshire Council Communities, Housing and Planning Policy Board Page 22 
Reason: To ensure that any archaeological remains which may be
disturbed can be identified, excavated and recorded. 
12. That prior to development commencing within the residential site, two
activity surveys for bats shall be undertaken with respect to potential bat
roosts at the outbuilding immediately east of Newton Cottage identified in
the Preliminary Ecological Appraisal by Brindley Associates dated
September 2020. Should any bat roosts be discovered, no development
shall take place prior to suitable mitigation measures being approved in
writing by Renfrewshire Council as Planning Authority. Development shall
thereafter only proceed in full accordance with these approved measures. 
Reason: To ensure the continued protection of existing bat populations in
accordance with European and national legislation. 
13. That prior to the occupation of any of the dwelling units hereby approved,
the footpath link as shown on drawing 17090-SK-15 Rev H shall have been
completed. The path shall be of a minimum width of 2.5 metres and a
maximum gradient of 5%. 
Reason: To ensure that the development is appropriately accessible to
sustainable modes of travel. 
14. That prior to the occupation of any of the dwelling units hereby approved
the specifications for the proposed lighting for the footpath as indicated on
drawing 17090-SK-15 Rev H shall have been submitted to and approved in
writing by Renfrewshire Council as Planning Authority and installed in
accordance with the approved details. 
Reason: To ensure that the path is suitable for use in the interests of
sustainable travel. 
15. That prior to the occupation of any of the dwelling units hereby approved,
Newton Avenue shall be upgraded in accordance with drawing 17090-SK-
19 Rev A, entitled ‘Proposed Road Gradients’.                  
Reason: To ensure the development is appropriately accessible. 
16. That prior to the occupation of any dwelling units hereby approved, the
following shall be installed on the extended access on Newton Avenue: 
(a) A handrail to the rear of the footway on both sides of Newton  
Avenue. 
(b) A screed of high friction surfacing on Newton Avenue where
excessive gradients occur. 
Reason: To ensure the development is appropriately accessible. 
Page 140 of 148

Page 145

Renfrewshire Council Communities, Housing and Planning Policy Board Page 23 
17. That prior to the occupation of any dwelling units hereby approved, details
of the improvements to be undertaken to the junction of Newton Avenue
with Main Road shall have been submitted and approved in writing by
Renfrewshire Council as Planning Authority and implemented in
accordance with the approved details. 
Reason: In the interests of improving the safety and functioning of the road
network in the area. 
18. That parking provision within the completed residential development shall
be provided in accordance with the parking standards outlined in the
National Roads Development Guide. For the avoidance of doubt, garages
are not to be counted towards this provision. 
Reason: To ensure appropriate levels of parking provision within the
residential development. 
19. That prior to the occupation of the greenkeeping facility, full details of any
lighting to be installed at the facility and on the access road from Newton
Drive shall have been submitted to and approved in writing by Renfrewshire
Council as Planning Authority and installed in accordance with the
approved details. 
Reason: In the interests of residential amenity. 
20. That prior to the occupation of the greenkeeping facility, a Noise
Management Plan outlining measures of good practice to be followed by all
employees at the facility shall have been submitted to and approved in
writing by Renfrewshire Council as Planning Authority and shall thereafter
remain in place for the lifetime of the development. 
Reason: In the interests of residential amenity.     
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other
background papers, please contact Gwen McCracken on 07483 419705.       
Page 141 of 148

Page 146

Page 142 of 148

Page 147

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No. 22/0057/PP
Agenda Item 
KEY  INFORMATION 
Ward: 
(6) Paisley Southeast 
Applicant: 
Mr Zubair Malik 
Registered: 
31 January 2022 
RECOMMENDATION 
Refuse 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of drive-through
dessert parlour (Class 1) with associated access and parking 
LOCATION: Unit E,1 Glenburn Road, Paisley, PA2 8TA 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
• The application site is within an area of open space covered
by Policy P1 of the Adopted Renfrewshire Local
Development Plan. 
• There have been forty one letters, and one petition received
which object to the development. 
• There have been no objections from consultees. 
Alasdair Morrison
Head of Economy &
Development
Item 12(c)
PACC140622 Page 143 of 148

Page 148

Renfrewshire Council Planning and Climate Change Policy Board Page 2 
RENFREWSHIRE COUNCIL
REPORT OF HANDLING FOR APPLICATION 22/0057/PP 
SITE ADDRESS  Unit E,1 Glenburn Road, Paisley, PA2 8TA
PROPOSAL  Erection of drive-through dessert parlour (Class 1) with associated
access and parking 
RECOMMENDATION Refuse 
PROPOSALS This application seeks planning permission for the erection of a drive-
through dessert parlour with associated access and parking on an
area of grassland at the junction of Glenburn Road and Caplethill
Road. 
The semi circle area of grassland is approx. 800 square metres. There
is a single mature tree on the site, and no boundary treatment. It is
bound by a hand car wash to the south, with Glenburn Road to the
west and north and Caplethill Road to the east. The nearest
residential properties are on Southfield Avenue approx. 15m to the
north west, and Fintry Avenue approx. 40m to the south west. 
The proposed development comprises a single storey container unit
positioned centrally within the area of open space. The container will
be clad in treated cedar wood battens, and will incorporate a dual
pitched roof. A semi circle area of approx. 440 square metres will be
hard surfaced around the building to provide parking and manoeuvring
space for vehicles. The remainder of the site will be left as grassland,
and the mature tree will be retained. 
Access will be shared with the hand car wash. There are two points of
access to the site in this regard, one from Glenburn Road to the west
and the other from Caplethill Road to the east. The development will
also use the bin storage arrangements associated with the hand car
wash. 
This report relates to an application for planning permission that would
normally fall within the Council's scheme of delegation to be
determined by an appointed officer. However, a request has been
submitted by three members, within 21 days of an application
appearing on the weekly list, that the matter be removed from the
scheme of delegation and that it be determined by the Board due to its
potential impact on the amenity of the surrounding residential area.
This request was submitted in line with the scheme submitted to
Scottish Ministers and approved by Council on 1 March 2018 and was
subject to discussion between the Convenor of the Communities
Housing & Planning Board and the Head of Economy and
Development who agreed that in this instance it would be appropriate
for Board to consider this application.
Page 144 of 148

Page 149

Renfrewshire Council Planning and Climate Change Policy Board Page 3 
SITE HISTORY Application: 11/0134/PP
Proposal: Change of use from petrol station and car wash to 24-hour
hand car wash and valeting site (in retrospect).
Decision: Grant subject to conditions 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – Comments made with respect to potential for ground
contamination, and noise associated with plant, machinery, and
equipment. 
Environment & Infrastructure Services (Roads) – Confirmation
sought over junction sightlines, pedestrian provision, parking and
internal circulation, traffic generation in close proximity to busy
junctions, anticipated vehicle trips, and management of access and
egress across the site as a whole. 
Glasgow Airport Safeguarding – No objections. 
REPRESENTATIONS  Forty one letters of representation and one petition have been
received. The letters and petition object to the application on the
following grounds. 
1 – Safety and increased traffic at the busy T junction 
2 – Access to the site for pedestrians (especially children) is unsafe 
3 – Cars waiting for orders could cause tail backs onto Glenburn Road 
4 – Loss of green space which is aesthetically pleasing and provides
visibility for drivers 
5 – Lack of parking 
6 – Litter 
7 – Noise and disturbance from late opening hours 
8 – Potential for anti-social behaviour 
9 – Over concentration of business uses within a residential area 
10 – Noise 
11 – Area is already well served by amenities 
DEVELOPMENT PLAN
POLICIES
Adopted Renfrewshire Local Development Plan (2021) 
Policy P1 – Renfrewshire’s Places
Policy P6 – Open Space
Policy C2 – Development Outwith Renfrewshire’s Network of Centres
Policy I1 – Connecting Places 
Page 145 of 148

Page 150

Renfrewshire Council Planning and Climate Change Policy Board Page 4 
Draft New Development Supplementary Guidance 
Delivering the Places Strategy – Creating Places and Open Space
Delivering the Centres Strategy – Meeting Local Neighbourhood
Demand
Delivering the Infrastructure Strategy – Connecting Places 
Material considerations
Renfrewshire's Places Residential Design Guide March 2015 
PLANNING
ASSESSMENT
Policy P1 states that within uncoloured areas on the proposals maps
there will be a general presumption in favour of a continuance of the
built form. New development proposals within these areas should
make a positive contribution to the place and be compatible and
complementary to existing uses. 
The existing area of grassland makes a positive contribution to the
amenity of the area. The grassland is not a formal recreational
resource as such, and its value primarily derives from the positive
contribution it makes to the place shaping of the residential
environment at the eastern end of Glenburn Road and Southfield
Avenue. 
The positive value of areas of open space is recognised by Policy P6
of the adopted Local Development Plan. Whilst the site is not formally
identified on the proposals map as an area of open space, the
associated draft new development supplementary guidance states
that areas of open space not formally identified will nevertheless be
protected from development unless certain criteria can be satisfied.
Each criterion will be assessed in turn. 
The proposed development is not for recreation or physical activity
use and will not improve the quality and range of facilities. 
There is not considered to be an excess of public open space in the
immediate area surrounding the site. It is recognised that agricultural
land to the east of Caplethill Road provides an open outlook to the
area. However, the site makes a positive contribution to the amenity
value of the residential environment, and this contribution will be
eroded should the site be developed. 
The development will lead to the loss of approx. half of the area of 
open space. 
There are no existing facilities on this area of open space, and it has
no formal function as a recreational resource. Therefore, there is no
requirement for off setting of recreational facilities in this regard. 
In terms of replacement of the loss of this area ground it is not
considered that alternative provision of equal value could be made
available at another location. 
The proposed development would provide an additional service in the
local area. However, there is a parade of units on Glenburn Road
Page 146 of 148

Page 151

Renfrewshire Council Planning and Climate Change Policy Board Page 5 
approx. 130m to the south west of the site which already serve local
neighbourhood demand in this area. There is also a detached unit
approx. 30m to the south west of the site which has recently been
granted planning permission to operate as a class 3 with hot food
takeaway (see application 19/0679/PP). On this basis it is not
considered that the potential benefit associated with another food
related establishment in the area would outweigh the open space
value of the site. 
The letters of representation have raised concerns over the potential
impact of the proposed development on the amenity of nearby
residential properties. However there have been no objections from
statutory consultees (subject to the imposition of conditions and the
submission of further information). On this basis, it is possible that the
principle of the proposed use may be acceptable within a residential
environment. 
However, it should be noted that the proposal does not constitute the
redevelopment of a brownfield site, and instead it would constitute the
loss of an area of open space that makes a positive contribution to the
amenity of the local area. The presumption is in favour of protecting
these areas of open space, and erosion of the space would have a
negative impact on the amenity of the area. 
On balance it is considered that the loss of open space associated
with the proposed development would have a detrimental impact on
the character and amenity of the place, and the value of the proposed
development does not outweigh the present value of the site. There is
not considered to be justification for the development in this regard,
and on this basis, it is contrary to Policies P1 and P6. 
Policy C2 states that proposals for new commercial development
should be located in accordance with the sequential approach.
Development outwith the network of centres must be justified against
several criteria including that the proposals are of an appropriate scale 
and do not significantly impact upon the function, character or amenity
of the surrounding area. 
As noted above, the proposed development will have a detrimental
impact on the character and amenity of the area as it will erode an
area of open space. It has not been demonstrated that the proposed
development would be of value in meeting a local neighbourhood
demand that would off set the loss of the open space. The
development is also therefore considered to be contrary to Policy C2. 
Policy I1 states that all development proposals require to ensure
appropriate provision and accessibility including the ability to connect
to active travel and public transport networks. Development proposals
which give priority to sustainable modes of travel and have no
significant impact on the safe and efficient operation of the local or
trunk road network will be supported. 
Environment & Infrastructure Services (Roads) has sought clarification
Page 147 of 148

Page 152

Renfrewshire Council Planning and Climate Change Policy Board Page 6 
on several aspects of the development, namely accessibility for
pedestrians and the potential impact on the local road network with
respect to access, sightlines, and traffic generation. 
The proposed development is vehicle orientated, and the layout at
present does not make provision for accessibility by other modes of
transport. The applicant has also not provided any evidence in support
of the development with respect to its potential impact of the
development on the local road network. In view of the above, the
proposal as it stands is contrary to Policy I1. 
In view of the above assessment, it is concluded that the proposed
development is contrary to Policies P1, P6, C2 and I1 of the Adopted
Renfrewshire Local Development Plan. Presumption is therefore
weighted in favour of retaining the area of open space in its current
form, and the proposed development does not justify the loss of open
space in this regard. It is therefore recommended that the proposed
development is refused.   
RECOMMENDATION Refuse 
Reason for Decision 
1.  The proposed development is contrary to Policy P1 and P6 of the adopted Renfrewshire
Local Development Plan and the draft New Development Supplementary Guidance on
Open Space in that it will result in the loss of an area of open space which makes a
positive contribution to the amenity of the place. 
2.  The proposed development is contrary to Policy C2 of the adopted Renfrewshire Local
Development Plan and the draft New Development Supplementary Guidance on Meeting
Local Neighbourhood Demand as it has not been justified and will have a detrimental
impact on the character and amenity of the surrounding area. 
3.  The proposed development is contrary to Policy I1 of the adopted Renfrewshire Local
Development Plan and the draft New Development Supplementary Guidance on
Connecting Places in that it does not make adequate provision for accessibility for
sustainable modes of travel nor has it been demonstrated that the development is
compatible with the safe and efficient operation of the local road network with respect to
access and traffic. 
Page 148 of 148