Minard Primary School - Consultation Report

Argyll and Bute Council · 7 March 2024
Back to Community Services Committee — 7 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

1 
Argyll and Bute Council: Education 
CONSULTATION REPORT 
Report on the outcome of the consultation relating to the proposal to close Minard
Primary School 
February 2024 
This document has been issued by Argyll and Bute Council in regard to a proposal in
terms of the Schools (Consultation) (Scotland) Act 2010 as amended.

Page 2

CONTENTS 
1. Summary of the Proposal ................................................................................... 3
2. Reasons for the Proposal ................................................................................... 3
3. Introduction ......................................................................................................... 3
4. Background ......................................................................................................... 4
5. Equality and Socio-Economic Impact.................................................................. 5
6. The Consultation Process ................................................................................... 5
7. Pupil Engagement............................................................................................... 7
8. Responses to the Consultation Exercise ............................................................ 8
9. Education Authority’s Response to Written/Oral Representations .................... 10
10. Education Scotland Report ............................................................................. 12
11. Education Authority Response to Education Scotland Report ........................ 12
12. Rural Schools – Compliance with Section 9(1) of the Schools (Consultation)
(Scotland) Act 2010……………………………………………………………………..13
13. Alleged Omissions or Inaccuracies ................................................................. 23
14. Opportunity to Make Representations to the Scottish Ministers ...................... 23
15. Conclusion ...................................................................................................... 24 
16. Recommendations ………………………………………………………………….25 
Appendix 1 - Proposal Paper 
Appendix 2 - EQSEIA  
Appendix 3 - Written Consultation Responses  
Appendix 4 - Public Meeting Minutes  
Appendix 5 - Education Scotland Report
Appendix 6 – Pupil Focus Group Responses

Page 3

3 
1. Summary of the Proposal 
1.1 It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. 
1.2 The catchment areas of Lochgilphead and Furnace Primary Schools
respectively (as detailed at Paragraph 2.2, and Appendix 3 of the
Proposal Paper) will be extended to include the current catchment area
for Minard Primary School. 
2. Reasons for the Proposal 
2.1  The above is considered to be the best option to address the reasons for the
proposal which are: 
• Minard Primary School has been mothballed for over four years. The
school roll is low and not predicted to rise significantly in the near
future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. In June 2023 there were
8.59fte primary school teaching vacancies in Argyll and Bute. 
• Whilst Minard Primary School is a sound building, it will deteriorate with
limited budgets for maintenance. The annual cost of the mothballing of
the building is £10,382. 
3. Introduction 
3.1   This is a Consultation Report prepared in compliance with the Schools
(Consultation) (Scotland) Act 2010 as amended (the 2010 Act) on the above
proposal. 
3.2 The purpose of this Report is to: 
• Provide a record of the total number of written responses made during
the statutory consultation period;  
• Provide a summary of the written responses;  
• Provide a summary of oral representations made at the public meeting
held on 29th August 2023 at 7.00 pm; 
• Provide a statement of the Council’s response to those written and oral
representations; 
• Provide the full text of Education Scotland’s report and a statement of
the Council’s response to this report;

Page 4

• State how the Council reviewed the proposal following the
representations received during the statutory consultation period and
receipt of the report from Education Scotland;  
• Provide details of any omission from, or inaccuracy in, the Proposal
Paper and state how the Council acted upon those; 
• State how the Council has complied with Sections 11A to 13 of the 
2010 Act when reviewing the proposal; and 
• Explain the opportunity that may arise to make representations to the
Scottish Ministers in connection with Section 15(4) of the 2010 Act. 
4. Background 
4.1   On 10th December 2019, Argyll and Bute Council approved the continued
mothballing of Minard Primary School on a temporary basis until December
2020, and that the School premises be retained during this time on a care and
maintenance basis. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8513&Ver
=4  (Agenda Item 11) 
4.2  Further to this, on 8th December 2020, the Community Services Committee
agreed that Minard Primary School would continue to be mothballed on a
temporary basis until May 2021 and that the school premises be retained
during this time on a care and maintenance basis. It was also agreed by the
Community Services Committee that in the intervening period, Education
Services would undertake a pre-consultation meeting as part of the preliminary
work and Options Appraisal process when it was permissible under the
Coronavirus Regulations relating to public gatherings. The Education Service
intended to undertake the required preliminary consultation, and an Options
Appraisal, for Minard Primary School in May 2021, but due to the restrictions
of the pandemic were unable to complete this work until the last term. The
Community Services Committee received a report presenting and outlining
details of a potential formal consultation under the Schools (Consultation)
(Scotland) Act 2010 (as amended) and a broad timeline of this process: 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=13970&Ver=4 
(Agenda Item 13b) 
4.3 Following the preliminary engagement exercise, the Education Service
prepared an Options Appraisal in respect of Minard Primary School, which was
considered by the Community Services Committee on 25th August 2022.
Members noted the outcome of the Options Appraisal (which identified closure
of the school as the most reasonable option in the circumstances); and agreed
that Officers now formulate a draft closure proposal that would come back to
the June 2023 meeting of the Committee for consideration by Members which,

Page 5

5 
if approved, would subsequently trigger the formal consultation process under
the 2010 Act. 
Agenda for Community Services Committee on Thursday, 25 August 2022, 10:00 am
- Argyll and Bute Council (argyll-bute.gov.uk) (Agenda Item 8). 
4.4 On 8th June 2023, the Community Services Committee agreed to adopt the draft
closure proposal in respect of Minard Primary School as a “relevant proposal”
that would proceed to a statutory consultation in terms of the 2010 Act. 
Agenda for Community Services Committee on Thursday, 8 June 2023, 10:30 am -
Argyll and Bute Council (argyll-bute.gov.uk) (Agenda Item 10b) 
4.5 Full details of the proposal, reasons for the proposal, the reasonable alternatives
to the proposal that were identified, an assessment of the proposal and each of
the reasonable alternatives, and an assessment of the educational benefits to
the proposal and each of the alternatives are set out in the Proposal Paper,
which is attached as Appendix 1. 
5. Equality and Socio-Economic Impact 
5.1   The Council, as a public authority, has a duty under the Equality Act 2010, the
Public Sector Equality Duty 2011, the Fairer Scotland Duty and the Islands
(Scotland) Act 2018 to have due regard to their provisions when making
strategic financial decisions. This is done through assessing the potential
impact of the decision on equality through Equality and Socio-Economic Impact
Assessments (EQSEIAs). The full EQSEIA in respect to the proposal to close
Minard Primary School is attached as Appendix 2. 
5.2 The EQSEIA identifies no negative impact. 
6. The Consultation Process 
6.1  Following the Council’s decision of 8th June 2023 where it agreed to adopt the
proposal as a “relevant proposal” in terms of the 2010 Act and issue it as a
basis for consultation, the Proposal Paper was made available on the Argyll
and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
6.2 A summary of that document was also provided to: 
• The Parent Councils of the affected schools 
• The parents of the pupils at the affected schools 
• Parents of children expected to attend an affected school within two
years of the date of publication of the Proposal Paper

Page 6

• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools 
• The teaching and ancillary staff at the affected schools 
• The trade unions representatives of the above staff 
• Argyll and Bute Councillors (Ward 3 - Mid Argyll)
• Furnace Community Council  
• West Loch Fyne Community Council  
• Lochgilphead Community Council
• Relevant users of the affected schools 
• The Constituency MSP 
• List MSPs for the area 
• The Constituency MP 
• Chief Superintendent, Police Scotland 
• Chief Executive, NHS Highland 
• Chief Executive Strathclyde Partnership for Transport (SPT) 
• Area Commander, Fire Scotland 
• Education Scotland 
6.3 A hard copy of the full Proposal Paper was also made available for inspection
at the following locations: 
• Council Headquarters, Kilmory, Lochgilphead, PA31 8RT 
• Education Offices, Argyll House, Dunoon, PA23 8AJ 
• Lochgilphead Library, Manse Brae, Lochgilphead, PA31 8XQ 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31
8RD 
• Lochgilphead Joint Campus, Kilmory, Lochgilphead, PA31 8AA 
• Inveraray Primary School (incorporating Furnace Primary School),
Inveraray, PA32 8XU 
6.4 The document was also publicised on Argyll & Bute Council’s weekly online
Newsround for the duration of the consultation period. The Newsround is
coordinated by the Council’s Communications Team and is sent, via email,
directly to around 4,000 contacts weekly. This was further supported by social
media postings about the consultation exercise, and the associated public
meeting, on Twitter (X) and Facebook. Physical posters were also situated in
the affected schools (Lochgilphead, Furnace and Inveraray Primary Schools)
and within local shops in Inveraray.   
6.5 The document was available in alternative formats or in translated form for
readers whose first language is not English. 
6.6 Summaries of the Proposal (containing a link to where the full Proposal Paper
could be read) were emailed to notify Education Scotland and all of the relevant
consultees (as prescribed by Schedule 2 of the 2010 Act) of the proposal and
invited them to make representations as part of the consultation process.

Page 7

7 
6.7 The consultation ran from 15th June 2023 until the close of business on 13th
September 2023 – which was over the minimum of six weeks including at
least 30 school days, as required by Section 6(4) of the 2010 Act. 
6.8 A public meeting was held at Minard Primary School on 29th August 2023 at
7.00pm.  Anyone wishing to attend the meeting and participate was welcome
to do so. Advance written notice of this meeting was given to all the “relevant
consultees” in terms of the 2010 Act. The meeting was convened by the
Education Authority who presented reasons for bringing forward the proposal.
There was an opportunity for questions to be asked and comments to be made. 
6.9 This Consultation Report is the Council’s response to the issues raised
regarding the proposal during the consultation exercise. It will be published on
the Council’s website for a period of no less than three weeks prior to final
consideration of the proposal by the Council’s Community Services Committee
on 7th March 2024.  
7. Pupil Engagement   
7.1   The proposal to close Minard Primary School could have an impact on pupils,
parents and the local community. Pupils’ views are a significant part of the
consultation process. To that regard, pupils from the Minard Primary School
catchment area took part in focus groups with officers from the Education
Service to share their views on the proposal. 
7.2   The focus group at Lochgilphead Primary consisted of four pupils, aged from
Primary 4 to Primary 7 that live within the current Minard Primary School
catchment area, and was held on 4th September 2023. 
7.3  The focus group at Furnace/Inveraray Primary Schools consisted of four pupils,
aged from Primary 2 to Primary 6 that live within the current Minard Primary
School catchment area, and was held on 7th September 2023. 
7.4   Primary pupils at both Lochgilphead and Furnace/Inveraray Primary Schools,
deemed to be of suitable age and maturity to be able to communicate a view
on the proposal, were provided with a PowerPoint that was presented by their
class teacher and were offered an opportunity to give their views and have
these recorded as part of the consultation process. 
7.5 The pupils were given information regarding the Council’s proposal and asked
for their thoughts and ideas through a series of questions. 
7.6  Pupils in the focus group held at Lochgilphead Primary School said:   
• “New houses could be built.”

Page 8

• “The building could be given to Minard Community Council to be used
as a community building.”
• “It could be used as a football pitch or play park.”
• “It would mean that there would be no local school as an option for any
new children in the village.”
• “Other people in the village have said they would rather it closed.”
• “There is already a bus to take children to school in Lochgilphead.
However, there needs to be a safer crossing to the bus stop.”
• “The school needs cleaned up and made safe.”
• “There should be security cameras and ‘no littering’ signs put up.”
• “Children can go to a bigger school in Lochgilphead where there are
more opportunities.” 
7.7  Pupils in the focus group held at Furnace/Inveraray Primary School said: 
• “Children have better opportunities for learning in a bigger primary
school.”
• “The building could be used for something else, a hotel, meeting place
or supporting the community.”
• “Children will make more friends in bigger schools.”
• “It would save money and the money could be used for other schools.”
• “I wonder what would happen to the building.”
• “Could we use some of the resources that are there as it would be a
shame to waste them?”
• “I worry that there are not many families or children in Minard.”
• “Having to drive to other schools is an issue. If Minard was open, they
could walk to school.”
• “Provide a school bus for children but this would add to climate change
and pollution.”
• “If it was closed we could play football there.”
• “If Minard children come to Inveraray, we would make them feel
welcome.”  
7.8     A summary of the pupil focus group responses is attached as Appendix 6. 
8. Responses to the Consultation Exercise   
8.1   There were five written responses received during the consultation period which
were all emailed to argyllhousereception@argyll-bute.gov.uk. They are
summarised below and four of the written responses can be viewed in full at
Appendix 3. 
8.2 One of the respondents did not give consent for their written response to be
made publicly available. Therefore, their written response is not included within
Appendix 3. They submitted that it does not seem logical to re-open or continue

Page 9

9 
mothballing the School due to lack of pupils. Pre-school children mostly attend
Inveraray ELC (or Lochgilphead Joint Campus ELC) and most parents choose
to continue their children’s Primary 1 education at the same establishments – to
maintain the friendship groups that they established in their pre-school years.
This respondent further submitted that children from the Minard Primary School
catchment area attending Furnace Primary School have the opportunity to learn
in a multi-composite class alongside their sister school – Inveraray Primary
School (as there is a joint head teacher arrangement in place). Moreover,
children who attend Furnace Primary School benefit from the rural environment
and strengths that a small village primary school can offer (e.g. access to
beach/forest school, horse riding lessons at Argyll Adventure, and community
events such as singing at local shops, restaurants and social housing.
Accordingly the respondent concluded by stating that, for the above reasons, it
makes most sense to close Minard Primary School and realign its catchment
area to Furnace and Lochgilphead Primary Schools – confirming that they are in
agreement with the proposal. 
8.3 Oral responses to the proposal were gathered at the public meeting, convened
by the Education Authority and held at Minard Primary School on 29th August
2023. Nine representatives from the local community attended along with two
local Councillors. Minutes of the public meeting are attached as Appendix 4. 
The nine members of the public present generally intimated an acceptance of
the proposal to close Minard Primary School and identified the potential for the
vacant Minard Primary School premises to be used as an asset for the
community. 
8.4 The written and oral responses to the consultation can be broadly grouped as
follows: 
8.4.1 Four out of the five written responses were in favour of the proposal to
close Minard Primary School.  One response was against closure and
moved for re-opening. At the public meeting those present intimated an
acceptance of the closure proposal, with potential use of the building as
a community asset. 
8.4.2 Three out of the five written responses expressed concerns over the
proposed realignment of the catchment area to both Lochgilphead and
Furnace Primary Schools. All three of those responses have indicated a
strong preference for one receiving school to avoid ‘splitting’ the
community.  Two of those responses state a clear preference for the
Minard Primary School catchment area to be subsumed in its entirety by
Furnace Primary School, rather than Lochgilphead Primary, on the
grounds of less travel time, travel safety, historical links (a previous
shared headship arrangement being in place between Minard and
Furnace Primary Schools) and maintaining the smaller, village school
model. The other respondent, having indicated a strong preference for
one receiving school, did not indicate any preference between

Page 10

Lochgilphead Primary or Furnace Primary. Similar concerns were
identified by stakeholders attending the public meeting. 
9. Education Authority’s Response to Written/Oral Representations 
9.1  Questions raised, and representations made, through the consultation process
fell into five main themes: catchment areas and receiving schools; reopening of
Minard Primary School; transport; process and response to consultation; and
community interest. 
9.2  Catchment Areas and Receiving Schools  
Question: Why is the Minard catchment area being split to two receiving
schools? 
Response: Based on the discussions previously held with families when the
school was initially mothballed, this approach was deemed to have regard to
those views, allowing a degree of choice of school. The proposed split in
catchment area would not affect a parent or carer’s right to make a placing
request to another school outwith their catchment area. If there is a clear view
from the consultation responses suggesting an alternative position in terms of
what happens to Minard Primary School’s catchment area if the school were to
close, then this is something that the Education Authority are required to
examine when the proposal is being reviewed (see Section 12, below). 
9.3  Re-opening of Minard Primary School 
Statement: Minard Primary School should be re-opened as it is a ‘halfway
house’ in between the larger Inveraray and Lochgilphead Primary Schools. Too
many smaller schools are being closed to the detriment of communities and
children who would thrive in a smaller, more nurturing environment. 
Response: Minard Primary School has been mothballed for over four years
and, taking account of the projected school roll, it is unlikely to become viable
for re-opening in the near future. One of the proposed receiving schools is
Furnace Primary School, which is a small school similar to Minard Primary
School, and could be considered to provide a smaller, more nurturing
environment. 
9.4  Transport 
Question: If children were not transported by parents to school, would pupils
re-zoned to Lochgilphead Primary School (should the proposal as consulted on
be implemented) travel on the service bus to Lochgilphead Joint Campus along
with the secondary pupils?

Page 11

11 
Response: The Council’s School Transport Team would advise on transport
arrangements available for the children to receiving schools. Assessments, if
required, can be carried out for a child who has additional support needs. The
Education Service work closely with colleagues in the Transport Team to
ensure whatever is put in place will be safe and legally compliant. 
9.5  Process and Response to the Consultation  
Question: The proposed implementation date is May 31st 2024 - why is this?
and what how will the Council respond to the consultation? 
Response: The Schools (Consultation) (Scotland) Act 2010 sets out the
specific statutory requirements which the Council are required to follow. This
includes the timeframes for reports to be produced and agreed by the Council
and Education Scotland, as well as a period for the Scottish Ministers to
consider call-in of any closure decision that the Council may make. The
proposed implementation date 31st May 2024 therefore allows for the entire
process to be carried out in accordance with the requirements of the legislation. 
Question: What will the Council do following the consultation exercise? 
Response: After the consultation closes, the Council are obliged to review the
proposal, and all of the identified reasonable alternatives, in light of the
consultation feedback, and Education Scotland’s independent report on the
proposal. This Consultation Report contains the Council’s responses to the
issues raised during the consultation period, as well as its review of the
proposal and all the identified reasonable alternatives. The Consultation Report
will be published on the Council’s website for a period of no less than 3 weeks
prior to consideration of the same by the Council’s Community Services
Committee on 7th March 2024. 
9.6  Community Interest 
Question: What will happen to the school premises if closure of the school is
taken forward? 
Response: The Council would be happy to hear from any group or individual
within the community that may wish to come forward with proposals for the
future of the building, should it be permanently discontinued as an educational
establishment. If there is an interest in the community taking over the building
discussions can be opened up in anticipation of a proposed closure. If there is
a clear expression of desire from the community to take over the building then
that is a route which can be explored further. The Council has, in the past,
transferred a previous school building over to the community following its formal
closure.

Page 12

10. Education Scotland Report 
10.1   In accordance with Section 8(2) of the 2010 Act, a report was produced by
Education Scotland on the educational aspects of the proposal. 
10.2   In preparing their report, Education Scotland considered all relevant
documentation in relation to the proposal. They also visited Lochgilphead and
Furnace/Inveraray Primary Schools to seek the views of relevant consultees.
An additional online meeting was offered for those unable to attend the in-
person meetings. 
10.3   The Education Scotland report is reproduced in full at Appendix 5. 
10.4 This report is generally supportive of the proposal and its findings can be
summarised as follows: 
a. Education Scotland agrees that there are potential educational benefits
for children arising from the Council’s proposal to close Minard Primary
School. For example, that there can be more opportunities for them to
learn, develop and socialise with a wider group of their peers. 
b. Education Scotland found that almost all staff, parents and children,
which HM Inspectors met with, agree with the Council’s proposal to
permanently close Minard Primary School.  However, a few stakeholders
have questioned the proposal to split the Minard catchment. The Council
should take these views into consideration when finalising the alignment
of catchment boundaries.   
c. In finalising the alignment of catchment boundaries, the Council may
wish to consider the alternative suggestion to realign the whole of the
Minard catchment area to Furnace Primary School. 
d. Education Scotland notes that should the Council decide to implement
the closure proposal, it should continue to engage with the Minard
community to explore options for the future use of the school building.   
11. Education Authority Response to Education Scotland Report 
11.1 The Education Service welcomes the report from Education Scotland and
agrees with its findings. 
11.2 The Education Service’s response to the findings contained within the
Education Scotland Report is as follows: 
(a) Education Scotland agrees that there are potential educational
benefits for children arising from the Council’s proposal to close Minard

Page 13

13 
Primary School. For example, that there can be more opportunities for
them to learn, develop and socialise with a wider group of their peers. 
11.3 The Council agrees that the educational benefits of the proposal for current and
future pupils are clear. Children also benefit from opportunities to work with a
wider number of peers and children at other stages, helping to develop social
skills. Throughout the consultation process, stakeholders have identified the
strength of the educational benefits and opportunities for pupils at Lochgilphead
and Furnace Primary Schools. 
(b) Education Scotland found that almost all staff, parents and children,
which HM Inspectors met with, agree with the Council’s proposal to
permanently close Minard Primary School.  However, a few stakeholders
have questioned the proposal to split the Minard catchment. The Council
should take these views into consideration when finalising the alignment
of catchment boundaries,   
(c) In finalising the alignment of catchment boundaries, the Council may
wish to consider the alternative suggestion to realign the whole of the
Minard catchment area to Furnace Primary School. 
11.4 The Education Service notes the views expressed by almost all stakeholders
which HM Inspectors met with that Minard Primary School should close
permanently. The Service further notes that views regarding an alternative
catchment area solution were expressed to HM Inspectors (as well as within
the consultation responses) and will review that alternative to the proposal in
order to further explore the best solution for how the School’s catchment area
should be realigned should it be permanently closed. This review and
assessment is conducted within Section 12, below.  
(d) Education Scotland notes that should the Council decide to implement
the closure proposal, it should continue to engage with the Minard
community to explore options for the future use of the school building. 
11.5 Argyll and Bute Council is open to engaging with the local community on any
plans or proposals that they may come forward with to develop a sustainable
community facility. 
12. Rural Schools – Compliance with Section 9(1) of the Schools
(Consultation) (Scotland) Act 2010 
12.1 After the Education Authority received Education Scotland’s report, officers
carried out a further review of the proposal following the close of the
consultation, having regard (in particular) to: 
• Written representations received by the Authority (from any person)
during the Consultation period;

Page 14

• Views of Lochgilphead and Furnace/Inveraray Primary pupils as
gathered during the consultation exercise,
• Oral representations made to it (by any person) at the public
meeting, and 
• Education Scotland’s report. 
12.2 The feedback from the Consultation was considered by officers. Data and
factual information was checked where required and advice sought from other
Council services where necessary. This ensured that the Council met the
requirements to review the proposal under Sections 9(1) and 13(5) of the 2010
Act. 
12.3 One of the underlying reasons for the Proposal thus far has been, in common
with many other Scottish local authorities, the challenge of teacher recruitment
in Argyll and Bute. At the time the Proposal was issued as a basis for statutory
consultation (June 2023) there were 8.59fte vacancies for primary teachers in
Argyll and Bute. Given that this is a fluid figure, it has been reviewed and as of
the end of January 2024 it is now 10.84fte. This update shows that teacher
recruitment continues to be a challenge for the Council and an important factor
to consider in relation to the ability to staff all of our schools.  
12.4 In addition, officers carried out a further assessment of the proposal and each
of the reasonable alternatives to it as set out in the Proposal Paper, having
particular regard to the preliminary requirements for rural school closures as
set out in Section 12A of the 2010 Act. 
12.5 The Options Appraisal (carried out in satisfaction of the preliminary
requirements of the 2010 Act) and Proposal Paper (which formed a basis for
statutory consultation) identified three options: 
a) Re-open Minard Primary School, 
b) Continued Mothballing of Minard Primary with pupils zoned to
Lochgilphead Primary and Furnace Primary schools. 
c) Close Minard Primary School and realign its catchment area to
Lochgilphead Primary and Furnace Primary schools (The Proposal). 
12.6 Each of these options have been further reviewed and assessed, below, in
light of the consultation responses: 
12.7 Re-open Minard Primary School 
12.7.1 Minard Primary School has been mothballed for over four years.
The school roll is zero, and is not predicted to rise significantly in
the near future.    
12.7.2 Re-opening the School would incur an economic impact with
respect to the considerable expenditure needed to bring the

Page 15

15 
building up to standard. There would also be costs relating to
staffing, and ongoing maintenance. 
12.7.3 Whilst community concerns about a village school being the heart
of a community and a valuable amenity are recognised, there are
no specific educational benefits from re-opening this particular
mothballed School - as all schools, including Furnace and
Lochgilphead, implement Curriculum for Excellence ensuring
effective learning and teaching which is matched to the needs of
children. 
12.7.4 Re-opening the school could have a positive environmental
impact in terms of pupils living in the village being able to walk to
school, as opposed to travelling by car/bus (as per the current
arrangements since the school has been mothballed). However,
there would also be an environmental impact in terms of re-
opening/heating the school building, particularly if it were only for
a very small number of pupils. 
12.7.5 The above-mentioned potential positive impact on environment
(with regards to travelling arrangements) has been weighed up
against the very low projected pupil numbers, the challenges in
recruiting teaching staff and the considerable expenditure needed
to bring the building up to standard. In addition, only one
stakeholder response supported re-opening the School. For all of
these reasons, and following a review of the Proposal and all
reasonable alternatives in light of the consultation feedback, re-
opening Minard Primary School is still not considered to be the
best option to address the underlying reasons for the Proposal. 
12.8 Continued Mothballing of Minard Primary School with pupils zoned to
Lochgilphead Primary and Furnace Primary schools. 
12.8.1 Minard Primary School has now been mothballed for over four
years. The School roll is not predicted to rise significantly in the
near future, with no indication (based on the evidence currently
available) that the School could become viable or sustainable in
the near future. 
12.8.2 Continued mothballing would incur an economic impact with
respect to the annual expenditure needed maintain the building.  
If the mothballing of Minard Primary was to continue, the building
would likely deteriorate further and incur additional costs.

Page 16

12.8.3 Continued mothballing of Minard Primary School would have a
neutral environmental impact on the current transport position,
and would have no impact on the current travel arrangements for
staff and pupils. 
12.8.4 There are no specific educational benefits from continuing to
mothball the school as children from the Minard Primary School
catchment area, presently attending Furnace, Lochgilphead and
Inveraray Primary Schools are benefitting from the rural broader
environment, whilst not moving their learning to a school that is
completely different to their home environment. The small number
of children involved has minimal effect on staffing within the
receiving primary schools. 
12.8.5 Almost all stakeholders from the local community who
participated in the consultation were not in favour of further
mothballing Minard Primary School, identifying waste due to
deterioration of the property and potentially the sustainability of
the community. Continued mothballing is not assessed to have
any positive impacts on the underlying reasons for the Proposal. 
12.8.6 On the basis that pupil numbers are currently zero and not
predicted to rise significantly in the near future; having regard to
the significant ongoing costs of maintaining the School premises
whilst it is mothballed; and that continued mothballing of the
School does not generate any benefits to the local community or
the Council or otherwise address the underlying reasons for the
Proposal – it has therefore been assessed that the continued
mothballing of Minard Primary School is still not considered to be
the best option to address the underlying reasons for the
Proposal. 
12.9 Close Minard Primary School and re-align its catchment area to Lochgilphead
Primary School and Furnace Primary School (The Proposal).  
12.9.1 Almost all stakeholders who responded to the consultation
accepted that re-opening Minard Primary School was not viable
or sustainable due to the very low projected pupil numbers within
the catchment area. 
12.9.2 The majority of stakeholders agreed that a decision on the future
of Minard Primary should be made, with the building potentially
being thereafter transferred for community use. Almost all

Page 17

17 
stakeholders agreed that the School premises should not be
allowed to fall into a state of disrepair (which would likely occur as
a result of prolonged mothballing). Formal closure of the school
would mean that any plans for alternative use of the premises
could potentially be progressed by the community or any third
parties. Such alternative uses of the premises have a greater
chance of generating benefits to the local community in contrast
to a mothballed school. 
12.9.3 If Minard Primary School were to be permanently closed, it would
generate savings to the Council of approximately £10,382, which
is the current annual cost of mothballing. This was considered to
be a drain on the resources of the Council by many stakeholders,
and diverts spending from areas that directly affect the
educational attainment of pupils.  
12.9.4 The current travelling arrangements have been in place for more
than four years, and transport costs taking pupils to alternative
schools since mothballing are approximately £1,482.
Implementation of the Proposal would have a neutral
environmental impact on the current transport position, and would
have no additional impact on the travel arrangements for staff and
pupils. 
12.9.5 The Proposal identifies two receiving schools: Lochgilphead
Primary and Furnace primary. Both schools offer a curriculum
which includes a broad range of experiences to help every child
and young person to develop knowledge, skills and attributes for
success in learning, life and work. The main difference between
the schools is size of roll and local context: Furnace Primary
School is a small rural school with a modest roll; and
Lochgilphead Primary is part of a 3-18 campus situated in a rural
small town. 
12.9.6 Furnace Primary School is a small, rural, village school where
children may be taught in classes composed of more than one
year group. Children benefit from being part of a social context in
which they can build relationships with different groups and
individuals, develop social skills, meet challenges and exercise
responsibilities as members of a social group.  
12.9.7 Travel time to Furnace Primary is approximately 7 minutes by car
(3.82 miles).

Page 18

12.9.8 Furnace Primary was considered by some of the respondents as
the ‘preferred’ school due to its small school rural context and
better replicating the previous Minard Primary School experience,
prior to its mothballing.  Reduced travel time and historical links
of shared Headship between Furnace and Minard Primary
Schools were also highlighted by stakeholders in their responses
to the Consultation. 
12.9.9 At Lochgilphead Primary children are taught in single year groups
and there is a wide range of expertise within a larger staff team.
The school has strong community links and children learn in a
variety of contexts and groups including ability, co-operative and
social. The 3-18 school provides a number of wider curricular
activities and pupils transition within the campus from Pre-5 to
secondary education. 
12.9.10 Travel time from Minard to Lochgilphead Primary School is
approximately 19 minutes by car (13.13 miles). Consultation
feedback indicated that the additional travel time, and some
perceived safety issues, was a disadvantage for younger pupils
and did not realise the wishes of some members of the community
to retain a small rural school model for the catchment area of
Minard. 
12.9.11 Much of the consultation feedback and findings continue to
support the position that permanent closure of Minard Primary
School is the best option to address the underlying reasons why
the future of the School is in the process of being examined.
However, the majority of stakeholder responses and concerns
raised during the consultation exercise centred on the suggestion
of implementing two receiving schools and catchment boundaries
which could have the outcome of “dividing” the village. This part
of the Proposal was perceived by many to have the potential to
fracture the local community. Taking account of these views, a
new reasonable alternative to the Proposal has surfaced as a
result of the consultation exercise (i.e. to close the School and
have its catchment area subsumed in its entirety by Furnace
Primary School) and this is reviewed further, below.  
12.10 Close Minard Primary School and Re-align its Catchment area to Furnace
Primary School 
12.10.1 Whilst the vast majority of consultation feedback supported the
closure of Minard Primary School, concerns were raised by

Page 19

19 
stakeholders about the possible “split” in the School’s catchment
area following proposed closure, and the negative impacts that
this could have on the local community. As such, many of those
stakeholders suggested closing Minard Primary School and re-
aligning its catchment area in its entirety to Furnace Primary
School. 
12.10.2 In reviewing this new alternative to the Proposal, raised as part of
the consultation exercise, officers have taken into account the
rural school factors, as well as a number of other relevant
considerations, as set out below. 
12.10.3 The following table sets out the schools that primary aged pupils
residing within the Minard Primary School catchment area
currently attend: 
School P1 P2 P4 P5 P6 P7 Grand
Total
Furnace Primary
School     
1 1
Inveraray Primary
School
1 2 1 1 1  6
Lochgilphead Primary
School  
1   2 3
Total 1 2 2 1 1 3 10 
12.10.4 At the time of the proposed closure of Minard Primary School (31st
May 2024), three of the existing pupils residing in the Minard
Primary School catchment area will transition to secondary
school, leaving a total of six primary pupils attending Inveraray
Primary and just one pupil at Lochgilphead Primary. As can be
seen from the above, over time, the majority of children from the
Minard Primary School catchment area have been placed in
Inveraray Primary School by virtue of placing requests. 
12.10.5 Since Minard Primary School’s mothballing, the picture of
alternative school provision and parental choice since that time
has been complex. However, it is clear from the above figures that
the preferred direction for existing parents of primary school aged
children in Minard is geographically towards Inveraray, rather
than to Lochgilphead. The reasons for parental choice to
Inveraray Primary School is inconclusive, but may include
reasons such as access to ELC, straightforward transition from
there to Primary School, and/or work arrangements of parents. 
12.10.6 Officers further examined the proposed “split” in Minard Primary
School’s catchment area which would be a result of the Proposal,

Page 20

as consulted on, with reference to the relevant postcodes, as set
out in the below table:  
Postcode PA32
8YA
PA32
8YB
PA32
8YD
PA32
8YE
PA32 8YG PA32
8YR
Proposed
Catchment
Area
Furnace
PS
Furnace
PS
Furnace
PS
Furnace
PS
Lochgilphead PS Furnace
PS 
12.10.7 As can be seen from the above, the existing Minard Primary
School catchment area covers six individual postcodes. As per
the Proposal as consulted on, children living in the north section
of the existing catchment area from Achagoyle Bay to
Blackstone Bay would be re-zoned to Furnace Primary School
(with that section of Minard’s catchment area being subsumed by
Furnace Primary School) and children in the south section of the
catchment area from Achagoyle Bay to Kilmichael Beg would be
re-zoned to Lochgilphead Joint Campus (with that section of
Minard’s catchment area being subsumed by Lochgilphead
Primary School). As a result of this division, five out of six Minard
postcodes would be re-zoned to Furnace Primary School, whilst
only one postcode would be re-zoned to Lochgilphead Primary
School. Although the delineation of catchment areas cannot
anticipate future enrolments, or affect the rights of parents to
make placing requests, the above demonstrates that the majority
of Minard postcodes would be re-aligned to Furnace Primary
School under the Proposal as consulted on. It therefore seems
reasonable and appropriate to officers to have all Minard
Postcodes re-aligned to the same catchment area. 
12.10.8 Three of the five written consultation responses identified
concerns regarding the proposed two receiving schools of
Lochgilphead and Furnace Primary Schools under the proposal
as consulted on. All three of those responses indicated a strong
preference for one receiving school to avoid “splitting” the local
community.  Two of those responses stated a clear preference for
the Minard Primary School catchment to be subsumed in its
entirety by Furnace Primary School, rather than Lochgilphead
Primary School, on the grounds of less travel time, travel safety,
historical links (i.e. a previous shared headship arrangement
between Minard and Furnace Primary Schools) and maintaining
the smaller, village school model. Officers have reviewed the
proposal in light of this consultation feedback and the views
expressed regarding concerns about “splitting” the village under
the proposed re-alignment of the catchment area are considered
by officers to be valid. Re-aligning the catchment of area of
Minard Primary School to only one school would avoid such a
split, which on review, officers agree could have a negative impact
on the local community and sustainability of that community.
Therefore, Furnace Primary School had been identified by

Page 21

21 
stakeholders and officers as the preferred option to realign the
entire Minard Primary School catchment area to. In addition, as
identified in the earlier Options Appraisal and Proposal Paper, the
travelling time from Minard to Furnace Primary School is shorten
than to Lochgilphead Primary School. A shorter journey is
considered to be of benefit to pupils, families and to the
environment. 
12.10.9 At the time of publication of this Consultation Report, the headship
of Furnace Primary School is a shared headship arrangement
with Inveraray Primary School. Present staffing circumstances at
Furnace Primary School have resulted, with parental agreement,
in children attending Inveraray Primary School as a temporary
solution. Previously, Furnace and Minard Primary Schools had a
shared head teacher arrangement in place – meaning that there
are historical ties between the two communities. Accordingly,
officers have assessed this alternative to the Proposal and
consider that re-zoning the entire Minard Primary School
catchment area to Furnace Primary School may act as a measure
to support the future school roll of Furnace Primary School;
acknowledges the pre-existing/ongoing links between the
Furnace and Minard communities; recognises the community
preference (via consultation feedback) for the small rural school
model, and has potential to build on the links, teaching and
learning experiences that are already established through the
shared headship arrangement between Furnace and Inveraray
Primary Schools. 
12.10.10 In considering the Educational Benefits in relation to this
alternative to the Proposal, officers reviewed the Educational
Benefits Statement that was prepared in relation to Furnace
Primary School (see Sections 15 – 24 of the Proposal Paper at
Appendix 1). That review has concluded that the educational
benefits, and effects as identified therein are still valid, and that
there are positive educational benefits to be derived from all
relevant groups (pupils in particular) should education provision
at Minard Primary School be permanently discontinued, and if its
catchment area was to be subsumed by Furnace Primary School.
The consultation feedback received has not led officers to the
view that it is necessary to reconsider that Educational Benefits
Statement. 
12.11 Officers of the Education Authority have listened carefully to the points
made by stakeholders at the public meeting, and have considered equally
carefully the Education Scotland report and the online and written
representations. As set out above, the Proposal has been reviewed to
consider whether any of the consultation feedback has led the Education
Service to reconsider any other options as being reasonable alternatives to

Page 22

the Proposal. As part of the consultation process, representations were
received which led officers to conclude that a new option, suggested around
a single receiving school, should be considered as a new reasonable
alternative to the Proposal. This review had special regard to the likely
effect on the local community, and the likely effect of any different travelling
arrangements. Having reviewed the Education Scotland report, and
feedback from consultees in respect of the proposal and each of the
reasonable alternatives, officers have concluded that the proposal should
be altered to reflect the new alternative raised by stakeholders as part of
the consultation process. 
12.12 This review has concluded that education provision at Minard Primary
School should be permanently discontinued with effect from 31st May 2024. 
However, that assessment has also led the Education Service to the view
that the Proposal should be amended, with reference to the re-alignment of
Minard Primary School’s catchment area, to the following: 
Education provision at Minard Primary School shall be
permanently discontinued with effect from 31st May 2024;
and the catchment area of Furnace Primary School shall be
extended to subsume the whole delineated catchment area
of Minard Primary School. 
12.13 The below diagram therefore sets out the new proposed catchment area for
Furnace Primary School: 
© Crown copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 10002336

Page 23

23 
12.14 Formal closure of the school would allow any plans to acquire the building
to be progressed by the local community, which in turn would increase the
availability of the premises to the community and even benefit the
sustainability of the community. The overwhelming majority of consultation
were not in support of the school being reopened for education provision.
Education Scotland’s report is also supportive of the Council’s proposal
being implemented. 
12.15 Therefore, the Council has had regard to the points made at the public
meeting, the written consultation responses and Education Scotland’s report.
It thereafter carried out a review of the Proposal and all the reasonable
alternatives and has concluded that the Proposal should be altered with
regards to the catchment area to reflect the alternative raised as part of the
consultation feedback. Implementation of this alternative to the Proposal will
allow children to have access to increased learning opportunities, wider
experiences and better socialisation through being part of a larger school.
The current number of children within the Minard Primary School catchment
area is insufficient to make the school viable, but that stakeholder views on
a single receiving school for the Minard catchment area can be actioned
through implementation of this alternative to the Proposal as consulted on. If
the school were to remain mothballed this would be a continuing drain on the
Council’s resources. Implementation of the identified alternative to the
Proposal (as per Paragraph 12.12, above) will assist the Council to deliver
‘Best Value’ through making more efficient and effective use of its resources.
Furthermore, the Council will engage with the Minard community to explore
options for future use of the mothballed school should they wish to progress
this. 
13. Alleged Omissions or Inaccuracies 
13.1 Section 10(3) of the 2010 Act places a requirement on the Council to provide
details of any inaccuracy or omission in the Proposal Paper which has either
been identified by the Council or raised by consultees. This provision also
requires the Council to provide a statement on the action taken in respect of
the inaccuracy or omission, or if no action was taken, to state that fact and why. 
13.2   In the course of the statutory consultation, there were no areas identified by the
respondents as being inaccurate or omitted from the Proposal Paper. 
14. Opportunity to Make Representations to the Scottish Ministers 
14.1  If the Education Authority makes a closure decision, it shall notify the Scottish
Ministers within 6 working days of that decision and publish the fact that the
Scottish Ministers have been notified, and that representations can be made to
them. The Education Authority would also be required to publish a notice on its
website of the decision to implement the proposal and why it has been satisfied

Page 24

that closure is the most appropriate response to the reasons for formulating the
proposal. 
14.2   The Scottish Ministers will have a maximum of 8 weeks to call in any closure
decision made by the Education Authority in certain circumstances. This 8 week
timeframe would consist of an initial 3 weeks from the date of decision, during
which representations can be made to the Ministers, and a further 5 weeks for
the Scottish Ministers to decide whether to issue a call in notice. During this
period the Education Authority will not proceed to implement any closure
decision. 
14.3 If the Scottish Ministers call in a closure proposal, it is referred to the Convener
of the School Closure Review Panels. The Convener must constitute a School
Closure Review Panel within 7 days for determination. The Education Authority
may not implement a closure decision in whole or in part until the Panel has
made its determination. It will usually issue a decision within 8 weeks of the
Panel being constituted. 
14.4  If the School Closure Review Panel refuses to consent to the closure decision,
or following publication of the Consultation Report the Education Authority
decides not to implement the closure proposal, the Education Authority cannot
publish a further closure proposal in relation to the school for 5 years, unless
there is a significant change in the school’s circumstances. 
15. Conclusion 
15.1  Following a review of the Proposal (as per Section 12, above) it is now proposed
that education provision at Minard Primary School shall be permanently
discontinued with effect from 31st May 2024, and the catchment area of Furnace
Primary School shall be extended to subsume the whole delineated catchment
area of Minard Primary School. 
15.2   This is considered to be the best option to address the underlying reasons for
this consultation, which are: 
• Minard Primary School has been mothballed for over 4 years. The school
roll is currently zero, and is not predicted to rise significantly in the near
future. 
• Whilst Minard Primary School is a sound building, it will deteriorate during
mothballing with limited budgets for maintenance. The annual cost to the
Council of the mothballing of the building is approximately £10,382;  
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. As of the end of January 2024,
there were 10.84fte primary teacher vacancies in Argyll and Bute.

Page 25

25 
16. Recommendation 
16.1   On the basis of the consultation responses received, Education Scotland’s
report, and having particular regard to the specific factors for rural school
closures, it is recommended that education provision at Minard Primary School
be permanently discontinued with effect from 31st May 2024; and that the
delineated catchment area of Furnace Primary School shall be extended to
subsume the whole delineated catchment area of Minard Primary School.

Page 26

APPENDIX 1 
Argyll and Bute Council                                 
Education            
PROPOSAL DOCUMENT:  June 2023              
Review of Education Provision 
Minard Primary School

Page 27

27 
Proposal for the closure of Minard Primary School 
SUMMARY PROPOSAL 
It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. 
The catchment areas of Lochgilphead Primary School and Furnace Primary
School shall be extended to include the current catchment area of Minard
Primary School. 
Reasons for this proposal 
This is the best option to address the reasons for the proposals which are; 
• Minard Primary School has been mothballed for over 4 years. The
school roll is zero and not predicted to rise significantly in the near future. 
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
8.59 fte primary vacancies for teachers in Argyll and Bute. 
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance.  The annual cost of the mothballing of the
building is £10,382.    
This document has been issued by Argyll and Bute Council in regard to a proposal in
terms of the Schools (Consultation) (Scotland) Act 2010 as amended.  This document
has been prepared by the Council’s Education Service with input from other Council
Services. 
DISTRIBUTION 
A copy of this document is available on the Argyll and Bute Council website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals 
A summary of this document will be provided to: 
• The Parent Councils of the affected schools 
• The parents of the pupils at the affected schools 
• Parents of children expected to attend an affected school within 2 years of the
date of publication of this Proposal Document

Page 28

• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools 
• The teaching and ancillary staff at the affected schools 
• The trade unions representatives of the above staff 
• Argyll and Bute Councillors (Ward 3 Mid Argyll)
• Furnace Community Council  
• West Loch Fyne Community Council  
• Lochgilphead Community Council
• Relevant users of the affected schools 
• The Constituency MSP 
• List MSPs for the area 
• The Constituency MP 
• Chief Superintendent, Police Scotland 
• Chief Executive, NHS Highland 
• Chief Executive Strathclyde Partnership for Transport (SPT) 
• Area Commander, Fire Scotland 
• Education Scotland 
A copy of this document is also available from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochgilphead Library, Manse Brae, Lochgilphead, PA31 8XQ 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD 
• Lochgilphead Joint Campus, Kilmory, Lochgilphead, PA31 8AA 
• Furnace Primary Furnace, By Inveraray, Argyll PA32 8XU
• Inveraray Primary, Inveraray, Argyll

Page 29

29 
This document is available in alternative formats or in translated form for
readers whose first language is not English.    
If you would like this document in another language or format, or if you require
the services of an interpreter, please apply to the Executive Director, Argyll
and Bute Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT.   
Jezeli chcieliby Pañstwo otrzymaO ten dokument w innym jzyku lub w innym
formacie albo jeeIi potrzebna jest pomoc Uumacza, to prosimy o kontakt z
nami.

Page 30

1 Introduction 
1.1  On 10th December 2019, Argyll and Bute Council approved the continued
mothballing of Minard Primary School on a temporary basis until December
2020, and that the School premises be retained during this time on a care and
maintenance basis. 
Minard Primary School – Mothballing Decision:
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MI
d=8513&Ver=4  (Agenda Item 11) 
1.2  Further to this, on 8th December 2020, the Community Services Committee
agreed that Minard Primary School would continue to be mothballed on a
temporary basis until May 2021 and that the school premises be retained
during this time on a care and maintenance basis. It was also agreed by the
Community Services Committee that in the intervening period, Education
Services would undertake a pre consultation meeting as part of the preliminary
work and options appraisal process when it was permissible under the
Coronavirus Regulations relating to public gatherings. The Education Service
intended to undertake the required preliminary consultation, and an options
appraisal, for Minard Primary School in May 2021 but due to the restrictions of
the pandemic were unable to complete this work until the last term. The
Community Services Committee received a report presenting and outlining
details of a potential formal consultation under the Schools (Consultation)
(Scotland) Act 2010 (as amended) and a broad timeline of this process. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=13970&
Ver=4  (Agenda Item 13b) 
Following the preliminary engagement exercise, the Education Service
prepared an Options Appraisal in respect of Minard Primary School, which was
considered by the Community Services Committee on 25th August 2022.
Members noted the outcome of the Options Appraisal (which identified closure
of the school as the most reasonable option in the circumstances); and agreed
that Officers now formulate a draft closure proposal that would come back to
the June 2023 meeting of the Committee for approval by Members which would
subsequently trigger the formal consultation process under the Schools
(Consultation) (Scotland) Act 2010. 
Agenda for Community Services Committee on Thursday, 25 August
2022, 10:00 am - Argyll and Bute Council (argyll-bute.gov.uk) (Agenda
Item 8)

Page 31

31 
1.3  The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young
People (Scotland) Act 2014. The Act, as amended, introduced a presumption
against closure of a rural school and details specific requirements which the
education authority is required to follow if they are formulating a proposal to
close a rural school. This includes the introduction of certain preliminary
requirements which must be satisfied prior to the formulation of a proposal.      
1.4  In addition, the Community Empowerment (Scotland) Act 2015 sets out a new
right for community organisations to request the transfer of local assets into
local community ownership/management. This may be something that the
Community wish to consider as part of or as a consequence of this process.
Public bodies including Councils must consider such requests and make a
decision within six months of receiving a valid request.    
1.5  Minard Primary School has had zero pupils enrolled since elected members
approved the mothballing. 
1.6  There is a requirement to have special regard to the rural schools factors prior
to formulating a proposal to close a rural school. In particular it is necessary to
consider any reasonable alternatives before considering closure. It is also
necessary to consider the impact on the wider community of a potential closure
and the impact of any different travel arrangements. These factors have been
considered in the preliminary requirements which were undertaken prior to this
proposal being written. A full assessment of the preliminary requirements is
set out in the Options Appraisal, which is attached as Appendix 5. 
1.7  The Argyll and Bute Corporate Plan identifies Argyll and Bute as   an
area of Scotland with outstanding places, people and  potential for a prosperous
future for everyone. Our Council,  along with our Community Planning Partners, is
committed to ensuring that Argyll and Bute’s economic success is built on a growing
population.  At the time of writing new Council Priorities re Argyll & Bute’s Corporate
Plan for 2022-2027 are still in the  process of being finalised and considered. 
1.8  At the time of writing, our agreed Council Priorities are to ensure that:    
• The education we provide meets the needs of all our young people and
their families 
• We make the most of our assets to build the local economy  
• We support individual and community wellbeing 
• We strengthen and empower our communities  
• We ensure there are homes for all, we tackle poverty and build
opportunity  
• We have greener and cleaner communities  
• We are an employer of choice  
• We manage our finances prudently

Page 32

1.9  The Council, as an Education Authority, has a statutory duty in terms of the
Education (Scotland) Act 1980 to make adequate and efficient provision of
school education across their entire area for the current school population and
future pattern of demand. This is reflected in “Our Children, Their Future”
which is the Education Vision and Strategy for Argyll and Bute Council. 
2  Proposal 
2.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024.  The catchment areas of
Lochgilphead Primary School and Furnace Primary School shall be extended
to include the current catchment area of Minard Primary School as identified
in 2.2 and illustrated in Appendix 3. 
2.2 It is proposed that children in the Minard catchment area would be directed to
Lochgilphead Joint Campus or Furnace Primary, depending on where they live
in the catchment area. The proposal is that children living in the north section
of catchment area from Achagoyle Bay to Blackstone Bay attend Furnace
Primary (with that section of Minard’s catchment area being subsumed by
Furnace Primary School) and children in the south section of the catchment
area from Achagoyle Bay to Kilmichael Beg attend Lochgilphead Joint Campus
(with that section of Minard’s catchment area being subsumed by Lochgilphead
Primary School). A map illustrating the proposed new catchment areas within
Minard is attached in Appendix 3. 
Reasons for this proposal 
2.3     This is the best option to address the reasons for the proposal which are: 
• Minard Primary School has been mothballed for over 4 years. The
school roll is zero and not predicted to rise significantly in the near
future. 
• Along with several other rural councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are
8.59 fte primary vacancies for Head Teachers and teachers in Argyll
and Bute.    
• Whilst the school is mothballed, the building is deteriorating with limited
budget for maintenance.  The annual cost of the mothballing of the
building is £10,382.   
Additional Considerations 
• The Council needs to allocate its resources in a way that ensures the
quality of all of its services;

Page 33

33 
• This proposal will bring educational benefits and assist in ensuring that
the Education budget is more sustainable into the future. This proposal
document contains an Educational Benefits Statement;    
• The costs per pupil in under-occupied schools are excessively high;    
• Schools in the Council area are expensive to maintain and operate.
Retaining unnecessary accommodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils; and 
• There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition.  The present
condition is unsustainable and can only be improved by reducing the
extent of the estate. 
3 Preliminary requirements    
3.1  The Council is required to consider the future of Minard Primary School, as it
has been mothballed for over 4 years. The Council have considered the
reasons for making this proposal, and have also considered other viable
alternatives, the likely effect on the community and the likely effect of different
travelling arrangements as a consequence of this proposal.  Financial
implications were also considered. Some of these figures have been
recalculated since the Options Appraisal was produced.    
3.2  The Council considered how the implementation of this proposal would impact
on the education of the children affected. The Council also considered the
impact on the children who currently live in the catchment area but attend other
schools, as well as children who may potentially live in the catchment area in
the future.   
3.3 The place of the school in the community was also considered, in terms of
the impact this proposal would have on the sustainability of the community
itself. The school has not been used by the local community since it has been
mothballed. 
3.4  Impact on the environment was taken into account during the initial pre-
consultation process.  This included a consideration of the transport
implications if this proposal was to be implemented, as children would have to
travel by bus to attend Lochgilphead or Furnace Primary Schools. 
3.5  Three options were presented to the local community by the Council for
consideration during the pre-consultation phase, as required by section 12A
of the 2010 Act.

Page 34

3.6  Of the three options which were considered by the community and the Council;
(c) is the favoured option by the Council, as it was considered it most
adequately addressed the reasons for the proposal. 
a) Re-open Minard Primary School, 
b) Continued Mothballing of Minard Primary with pupils zoned to
Lochgilphead Primary and Furnace Primary schools. 
c) Close Minard Primary School and realign its catchment area to
Lochgilphead Primary and Furnace Primary schools (The Proposal). 
3.7 When considering the above options; the positive educational benefits of
Lochgilphead and Furnace Primary Schools alongside the factors of projected
low pupil numbers, the challenges in recruiting teaching staff and the
considerable expenditure needed to bring the building up to standard at Minard
Primary School, in addition the lack of local support for reopening Minard
Primary School, option (c) was considered the most appropriate response to
the underlying reasons behind consideration of this proposal. 
3.8 Following from an initial Options Appraisal which was presented to the Council’s
Community Services Committee on 25th August 2022, it was agreed that the
preliminary requirements were satisfied enabling the draft closure proposal to
be formulated, with the option to close Minard Primary School and realign its
catchment area to Lochgilphead and Furnace Primary Schools (in the manner
described at Paragraph 2.2, and Appendix 3, of this Paper) being identified as
the most adequate means of addressing the reasons for possible proposal. 
3.9 During the preliminary engagement regarding the future options for Minard
Primary School there were a range of viewpoints gathered from parents, young
people and members of the community.   
3.10 The community reflected that Minard Primary School had been an integral part
of the community, and there were contrasting views on the proposals for the
future of Minard Primary School.   
3.11 Closing the school would have no impact on staff or pupil travel from the current
arrangement. There would be no alteration to the current environmental impact.   
Alternatives to the Proposal 
3.12 The community engagement process prior to the drafting of this proposal
considered the views of members of the community and also considered any
other alternatives to the closure of Minard Primary School.  Full details from the
community engagement and the findings from the preliminary requirements,
including assessment of the reasonable alternatives, are attached as Appendix
5.   
3.13 In conclusion, after the pre-consultation with the community, the Council feels
that the proposal to close Minard Primary School and realign its catchment area

Page 35

35 
to Lochgilphead and Furnace Primary Schools (as described at Paragraph 2.2
& Appendix 3) is the most reasonable means to address the underlying reasons
for considering the future of Minard Primary School. Further detail is provided
in relation to educational benefits, travel, environmental impact, community
impact and financial impact below. 
4  Assessment of the Proposal 
4.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochgilphead and Furnace Primary Schools shall be extended to include the
current catchment area of Minard Primary School as detailed at Paragraph 2.2
and Appendix 3. 
4.2  Minard Primary School has been mothballed for over 4 years. The school
condition will deteriorate with limited budgets for maintenance. The school roll
is currently zero and although there is a small increase in pupils within the
catchment area projected, this is not significant enough to make the school
viable again. The annual cost of the mothballing of the building is £10,382. 
4.3  Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 10.84 fte primary
vacancies for Head Teachers and teachers in Argyll and Bute.    
4.4  The Council needs to allocate its resources in a way that ensures the quality
of all of its services. 
4.5  This proposal will bring educational benefits and assist in ensuring that the
Education budget is more sustainable into the future.    
4.6 The costs per pupil in under-occupied schools are excessively high. 
4.7  Schools in the Council area are expensive to maintain and operate.  Retaining
unnecessary accommodation is a serious drain on the resources of the
Council and diverts spending from areas that directly affect the educational
attainment of pupils. 
4.8  There is no realistic possibility at present of the Council being able to bring its
whole school estate up to a satisfactory condition. The present condition is
unsustainable and can only be improved by reducing the extent of the estate.    
4.9  As part of the preliminary requirements in the drafting of this proposal, the
Council considered three options.  The favoured option by the Council is (c),
as it was considered it most adequately addressed the reasons for the
proposal. 
a) Re-open Minard Primary School;

Page 36

b) Continued Mothballing of Minard Primary with the pupils zoned
to Lochgilphead and Furnace Primary Schools; 
c) Close Minard Primary School and realign its catchment area to
Lochgilphead and Furnace Primary Schools (The Proposal). 
4.10 Having considered these other alternatives the Council has made a decision
that these are not viable alternatives to the closure proposal, and will proceed
with the option to consult on the proposal to close Minard Primary School and
extend the catchment areas of Lochgilphead and Furnace Primary Schools
respectively (as detailed at Paragraph 2.2, and Appendix 3) to include the
current catchment area for Minard Primary School. 
4.11 The Council has undertaken an appraisal on impact if this proposal was to be
implemented.    
4.12 This includes an assessment of: 
• The school roll and predicted school roll; 
• Teacher numbers; and 
• The condition of the building. 
4.13 The Council has carefully considered and reviewed the steps it has taken to
address the underlying reasons for the proposal (as outlined at Section 2.3,
above), prior to formulating this Proposal Paper. 
4.13.1 In relation to the decline in the school roll, and no material
increase being predicted in the forthcoming years, the School
was mothballed over four years ago as a result of a change to
the School’s circumstances – i.e. the school roll falling to zero.
The Education Authority therefore decided to mothball the
school as a temporary measure – in order to monitor the situation
and assess whether there was any likelihood of the school roll
increasing to the extent that the School became viable again in
the near future. The mothballing was subject to review at least
annually and the Education Service undertook to review the
position should any further school age pupils move into the
catchment area and/or if they demonstrated a sufficient level of
demand for the School to justify its re-opening. As mentioned
above, the School has been mothballed for over four years, and
its roll is not predicted to rise in the forthcoming years to a level
which would make the School suitable for re-opening. As there
has been no material change in circumstance evidenced, and
having kept the position under review via mothballing for several
years, the Education Service are of the view that matters should
now move forward in the form of a statutory closure consultation
in order to determine the future of Minard Primary School. This
approach aligns with that suggested by the Statutory Guidance
for the 2010 Act, and Paragraphs 63-65 in particular. Further

Page 37

37 
details in relation to the School roll are set out at Section 5 of this
Proposal Paper 
4.13.2 In relation to the underlying reason for this proposal in regards
to recruitment of teachers, the issues that have been faced by
the Education Service regarding the recruitment of teachers to
Minard Primary School are detailed at Section 6 of this Proposal
Paper. Since the School’s mothballing, in order to address this
particular issue, and prior to formulating this proposal, the
Education Service have offered a number of posts across the
Authority area on a permanent basis to a locality, rather than to
a temporary school, as an attempt to increase the likelihood of
attracting a permanent post. The Council has also entered into
a strategic housing agreement with social housing partners to
support staff with sourcing accommodation (which is a particular
pressure in remote areas of Argyll and Bute), as well as offering
relocation packages. Furthermore, the Education Service
continues to work with UHI Argyll to recruit more local candidates
for teacher training. Notwithstanding these efforts, the
recruitment of teaching staff within Argyll and Bute remains a
considerable challenge, hence why it is still a main underlying
reason for this closure proposal. 
4.13.3 In relation to the underlying reason for this proposal concerning
the condition of the school premises, the school property will
continue to deteriorate whilst it remains mothballed. As
mentioned at Paragraph 4.13.1, above, there is currently no
evidence to suggest that the School will become viable for re-
opening in the near future. Whilst the School remains
mothballed, it costs the Council £10,382 annually. Accordingly,
the Education Service are now seeking approval to proceed with
a statutory closure consultation which, if subsequently
implemented, will allow the Education Service to use any
savings generated to the benefit of the other occupied schools
and pupils within the Education Authority’s area. It may also
allow for any plans for other uses of the School property to be
progressed, as it will need to be permanently discontinued as an
educational establishment in the first instance. Further
information about the condition of the School building and
premises can be found at Section 7 of this Proposal Paper. 
4.14 The Council has also undertaken an assessment of likely educational benefits
or effects which this proposal may have if implemented on:    
• The pupils of any affected school;   
• Any other users of the school’s facilities;

Page 38

• Any children who would (in the future but for implementation) be
likely to become pupils of the school; and 
• The pupils of any other schools in the Council area. 
4.15 In addition, the Council has also considered how to minimise or avoid any
adverse educational effects that may arise from the implementation of this
proposal. 
4.16 The Council has also taken special regard to the following factors if this
proposal was to be implemented, as Minard Primary School is classified as a
very remote rural school: 
• Likely effect on the local community to be assessed by reference
to: 
o The sustainability of the community; and 
o Availability of the school’s premises and other facilities for
use by the school community. 
• Likely effect caused by different travelling arrangements by
reference to the effect caused by such arrangements on: 
o Environmental impact; and 
o The schools pupils and staff and other users of the
schools facilities. 
4.17  Finally, the Council has also considered the financial implications of
implementation of the proposal and information on this is set out later in this
document. 
5 School Roll 
5.1  The information in relation to the school roll as shown below is drawn from the
yearly pupil census, which takes place in September each year. School rolls
by their very nature may fluctuate slightly on an ongoing basis due to changes
in pupil numbers as a result of pupils moving to and from the catchment area. 
The school roll of Minard Primary School has seen a steady decline since
2012. 
Table 2: Minard PS Furnace PS Lochgilphead
PS 
Roll Roll Roll
Capacity 33 50 249
2011-2012 10 21 213
2012-2013 9 18 221

Page 39

39 
2013-2014 6 12 231
2014-2015 8 10 230
2015-2016 6 7 233
2016-2017 5 7 221
2017-2018 1 6 221
2018-2019 3 13 227
2019-2020 0 10 226
2020-2021 0 12 207
2021-2022 0 9 212
2022-2023 0 3 210     
Predicted Roll* 
Table 3:   Minard PS Furnace PS Lochgilphead
PS   
Roll Roll Roll
Capacity  33 50 249
2023-2024   0(1) 3 203
2024-2025  2 5 198
2025-2026 1 4 188
*based on calculations available at February 2023  
(NB 2023-24   Primary 1 Minard catchment registration to attend   
Inveraray Primary by Placing Request.)  
5.2  In 2022-2023 there are 9 primary school aged children who live in the Minard
Primary School catchment area and who attend other schools.  One pupil
attends Furnace Primary; three pupils attend Lochgilphead Primary. The
remaining five pupils attend Inveraray Primary (by way of placing requests). 
5.3  The school roll is not predicted to rise significantly in the future. The area
around Minard is a small settlement and is not identified for growth in the Local
Development Plan: https://www.argyll-bute.gov.uk/ldp.    
5.4  Within the Minard Primary School catchment there is one housing
allocation identified in both the Adopted Local Development Plan 2015 and in
the emerging Proposed Local Development Plan 2. This is site H-AL 12/19 (re-
referenced to H3023 in LDP2). The allocation has a remaining capacity of 13
units with an extant planning permission (16/02279/PP). The Proposed Local
Development Plan 2 is currently at Examination with the Examination Report
anticipated within the month (at April 2023).  Allocation H3023 received
objections relating to the capacity of the Allocation and this is currently being
considered by the Reporter. There is a consent for a single dwelling outwith the
Allocation but within the Minard Primary School Catchment Area.

Page 40

6 Teacher numbers 
6.1  Teacher numbers been improving nationally 2016 - 2021.  In 2022 there was
a small reduction of 0.2% in the total number of teachers in Scotland.  In Argyll
and Bute there has been a 5% reduction in the fte number of teachers from
2021 and 2022.    
6.2  As the school has been mothballed for over 4 years, the issue of recruitment
of staff has not improved.  At the time of writing this report there are 8.59 fte
primary vacancies for Head Teachers and teachers in Argyll and Bute.  Despite
a sustained effort to secure permanent staff, there is no reason to think that
staffing would not continue to be a considerable challenge for Minard Primary
School 
6.3  At the current time, if the proposal was to be accepted and implemented
following consultation, there would be no impact on staffing levels at
Lochgilphead and Furnace Primary Schools.     
7 Condition of the building 
7.1  Outlined in the Options Appraisal (Appendix 5 – section 6.3) are the full
financial details in reference to costs for the re-opening the building or
continuing to retain the building as mothballed. 
7.2  As part of the consultation process the Council would be open to exploring
with the community options in regard to the future of the school building. This
might involve consideration of matters around the possibility to transfer the
building to a recognised community group through the provisions of the
Community Empowerment (Scotland) Act 2015 or some other agreed
mechanism. Such a route may provide the community with an opportunity to
utilise the building as a driver for community benefit and potential regeneration
that could also enhance the sustainability of the community.     
EDUCATIONAL BENEFITS STATEMENT – LOCHGILPHEAD PRIMARY SCHOOL  
8 Assessment of likely educational benefits on pupils 
8.1  If this proposal is implemented, the Council believes that there will be
considerable educational benefits arising from this.  These centre around: 
• Learning and teaching; 
• Meeting learners needs; 
• Broadening the range of opportunities; and 
• The environment for learning.

Page 41

41 
8.2 This initial statement focusses on Lochgilphead Primary School, which is
one of the schools that pupils from the Minard Primary School catchment area
could potentially attend. 
8.3 The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community. There are no specific educational benefits from reopening Minard
Primary School as all schools implement Curriculum for Excellence ensuring
effective learning and teaching which is matched to the needs of children,
however the closure of the school and continued attendance of pupils at other
schools allows children to experience a curriculum which is matched to their
needs.    
8.4 Minard and Lochgilphead Primary Schools are remote rural schools. Each
school is set within a very remote rural area (Scottish Government
classification). Although there are currently 9 school aged children in the
Minard Primary School catchment area, children from Minard Primary School
area who previously attended Lochgilphead Primary School continued to
benefit from education in a locality familiar to them, and still relatively close to
home.   
8.5 The co-location of the Early Learning Centre (ELC) and the primary classes at
Lochgilphead Primary School enables a strong transition process between the
ELC and school. 
8.6 Lochgilphead Joint Campus offers a 3-18 education experience which is
seamless at transition points between ELC to Primary and Primary to
Secondary. Children, young people and their parents/ carers benefit from
familiar and established relationships with their peers and teaching staff across
the sectors. 
9 Learning and Teaching 
9.1  The curriculum includes a broad range of experiences which are planned for
children and young people through their education, to help every child and
young person to develop knowledge, skills and attributes for success in
learning, life and work. In Lochgilphead Primary School, children are
encouraged to be eager and active participants who are engaged, resilient and
highly motivated during their learning. Children know that their views are
sought, valued and acted upon.    
9.2  The learning environment encourages high level of achievement, providing a
wide range of opportunities for children to achieve their full potential within the
four contexts of learning. In Lochgilphead Primary School children may be

Page 42

taught in classes composed of children from one year group or in some cases
a composite class covering two year groups. Lochgilphead Joint Campus also
encompasses a Learning Centre to support specific needs. Children benefit
from being part of a social context in which they can build relationships with
different groups and individuals, develop social skills, meet challenges and
exercise responsibilities as members of a social group. They are able to
interact and socialise with groups of children, take part in team activities and
move with their peers seamlessly to secondary school within the Lochgilphead
Joint Campus.    
9.3  There is a continual challenge for all schools to deliver a school improvement
agenda and deliver effectively the principles and outcomes of curriculum for
excellence. The National Improvement Framework priorities include raising
attainment for all, and closing the gap between the most and least
disadvantaged children.    
9.4  The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community.    
9.5  At Lochgilphead Primary School, staff are challenged and supported through
a range of continuous professional development and review opportunities
gained by working and learning with a range of colleagues. Lochgilphead
Primary School is part of the Mid Argyll and Kintyre Cluster, which means that
staff can be supported across the area, moderation and tracking of pupil
progress is enabled and staff work across stage appropriate groups.
Colleagues within Lochgilphead Primary School are able to support and
challenge each other on a daily basis. The whole staff are able to bring a range
of talents and skills to benefit outcomes for learners.    
9.6  Lochgilphead Primary School encourages nurturing and positivity. The co-
location of the nursery and the primary classes at Lochgilphead Joint Campus
enhance the transition process for children moving from Nursery to Primary
one, through joint educational processes and liaison between the two settings. 
10 Meeting learners’ needs 
10.1  Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to reach
their potential. Careful tracking and monitoring procedures are in place to
evidence pupil progress. This includes professional dialogue with teachers,
learning discussions with children, classroom observations, assessment and
looking at pupil work.

Page 43

43 
10.2  The school also has planned meetings and discussions with parents.  These
discussions between home and school improve parental engagement whilst
focussing on next steps for learning. Where appropriate, intervention is put in
place, while working effectively with other agencies and parents to ensure the
needs of each child are met. In the primary classes, the majority of children
are achieving national expectations in reading, writing, listening, talking and
numeracy.  All of the schools in Mid Argyll continue to develop within the
PATHS program supporting positive behaviours and relationship within the
school. 
10.3  The staff, parent body and partner groups also bring opportunities for
increased collaborative working. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced by staff
individual expertise e.g. PE, language, science, expressive arts teaching.   
11 Broadening the Range of Opportunities 
11.1  Children are offered a range of active, planned experiences which help them
develop the knowledge and understanding, skills, capabilities and attributes
which they need for their mental, emotional, social and physical wellbeing both
now and in the future. 
11.2  There is also a strong transition process between Lochgilphead Primary
School and Lochgilphead High School, due to the nature of the through school
3-18 arrangements where young people benefit from continuity in relationships
and connections. 
11.3  Children are provided with a variety of experiences to develop their sense of
responsibility, independence, confidence and enterprising attitude.    
11.4  Across the school children are engaged with learning and contribute well in
lessons. A strong sense of community exists with pupils and staff co-operating,
communicating and working collaboratively across the sectors to create a
vibrant centre of learning for all. 
12 Environment for Learning 
12.1  Lochgilphead Primary School is a suitably-equipped and well supported
school, situated in the town of Lochgilphead. The entire 3-18 campus, opened
in 2007, is modern, well maintained and along with the surrounding scenery
provides attractive accommodation for Lochgilphead Primary School within
Lochgilphead Joint Campus. The school has an all-weather pitch adjacent to
the school, which is well utilised. The building has facilities for pupils and
visitors with special access needs.

Page 44

12.2  The children maintain links with friends who live in their own village as well as
creating links with children from other rural communities. 
12.3  Any mitigating effects around the adverse weather and transport issues are
outweighed by the benefits of this proposal. There is no change to the travel
arrangements that are currently in place nor to the environmental impact from
these. The travel distance (sourced from Google maps) from Minard Primary
to Lochgilphead Primary is 13.13 miles via A83. Travel time is approximately
19 minutes by car.  The travel arrangements have been in place for more than
three years. 
12.4  In summary, there are a range of educational benefits for pupils if this proposal
was to be implemented, as summarised in the paragraphs above.  There are
benefits for the development of social and emotional skills, as well as the
educational benefits resulting from access to a more diverse curriculum. The
learning environment in Lochgilphead Primary School also offers children the
opportunity to participate in a wider range of active learning strategies.     
13 Assessment of likely educational benefits on other users of  the school’s
facilities 
Implications for staff 
13.1  If this proposal is implemented, there will be no new implications for teaching
and ancillary staff in Lochgilphead Primary School.   
13.2  If this proposal is implemented, the Council does not envisage any adverse
effects from the proposal in respect of staffing.  Should issues arise however,
these will be mitigated through the Council Educational Management Team
support structure. 
Early Learning Centre Users – Pre Five Children 
13.3  The co-location for the Early Learning Centre (ELC) and the primary classes
at Lochgilphead Primary School enables a strong transition process between
the ELC and the school and includes joint educational processes and liaison
between the two settings. 
14 Assessment of likely educational benefits on any children who would (in the
future but for implementation) be likely to become pupils of the school. 
Existing and future pupils 
14.1  Children who may live in this catchment area in the future will benefit from the
broad range of educational opportunities which are presented through this
proposal, as detailed above.

Page 45

45 
14.2  There would be positive educational benefits associated with this proposal
particularly in opportunities for increasing the range of the curriculum and
increasing the use of active pedagogies.   
14.3  The proposal could increase the roll of Lochgilphead Primary School and
would thus extend the peer group for all pupils, present and future.  The larger
school should be able to support a wider range of social and extra-curricular
activities.   
14.4  Pupils who would otherwise have attended Minard Primary School, which
consists of one classroom with dining area, corridor with cloakroom, toilets and
office, would benefit from access to modern purpose built accommodation
including dedicated sport facilities and specialist areas.  Pupils would have
access to access daily interaction in a larger peer group and from improved
educational arrangements as described above.  Pupils in the combined school
will have more shared experiences and opportunity for friendships.  This will
enhance their confidence and make the transition to secondary school
seamless through the Joint Campus arrangements.  Larger year groups make
the provision of specialist services more viable and provide enhanced
opportunities for school trips. Lochgilphead Primary School meets all the
requirements of the Equality Act 2010.   
15 EDUCATIONAL BENEFITS STATEMENT – FURNACE PRIMARY SCHOOL 
This second statement focusses on Furnace Primary School,  which is
one of the other schools that pupils from the Minard   Primary School
catchment area could potentially attend. 
Learning & Teaching 
15.1 The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community. There are no specific educational benefits from reopening Minard
Primary School as all schools implement Curriculum for Excellence ensuring
effective learning and teaching which is matched to the needs of children,
however the closure of the school and continued attendance of pupils at other
schools allows children to experience a curriculum which is matched to their
needs.    
15.2  Furnace Primary Schools is a remote rural school and set within a very remote
rural area (Scottish Government classification). Children from Minard Primary
School area, who previously attended Furnace Primary School, continued to
benefit from education in a locality familiar to them and still relatively close to
home.

Page 46

15.3 Furnace primary is presently staffed by a full time Principal Teacher and class
teacher (0.2FTE) which supports personalised learning in a supportive
environment. The school is also currently in a new and changed shared
headship arrangement with Inveraray Primary School. 
16 Learning and Teaching 
16.1 The curriculum includes a broad range of experiences which are planned for
children and young people through their education, to help every child and
young person to develop knowledge, skills and attributes for success in
learning, life and work. In Furnace Primary School, children experience good
quality, personalised learning taught in a single multi-composite class bringing
with that the opportunity to share learning experiences between the youngest
and oldest pupils, as well as within the immediate peer group.   Furnace
Primary is part of a shared Headship arrangement with Inveraray Primary
School, benefiting from close links with the larger school around educational
experience and planning tasks and activities that are matched to children’s
varying needs. The children at Furnace Primary are able to enhance their
social skills and confidence by interacting with a wider range of peers through
opportunities to learn at Inveraray Primary School in many  aspects of their
learning including Science, Physical Education and weekly outdoor learning.
16.2  The learning environment encourages high level of achievement, providing a
range of opportunities for children to achieve their full potential within the four
contexts of learning. In Furnace Primary School children will be taught in a
small class composed of children from more than one year group. Children
benefit from being part of a small social context in which they can build
relationships, develop social skills, meet challenges and exercise
responsibilities as members of a social group. They are able to interact and
connect with other children through shared Headship arrangement with
Inveraray Primary.  The Headteacher is committed to making proactive
connections between the schools and the respective local communities.  
16.3  There is a continual challenge for all schools to deliver a school improvement
agenda and deliver effectively the principles and outcomes of curriculum for
excellence. The National Improvement Framework priorities include raising
attainment for all, and closing the gap between the most and least
disadvantaged children.    
16.4  The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and
responsibility associated with broader guidance. This means that schools are
able to design their curriculum to meet the specific needs of their children and
community.

Page 47

47 
16.5  At Furnace Primary School, the small staffing complement are challenged and
supported through a range of continuous professional development and review
opportunities gained by working and learning with colleagues at Inveraray
Primary School. Furnace Primary School is part of the Mid Argyll and Kintyre
Cluster, which means that staff can be further supported to collaborate,
moderate and track pupil progress and work with other colleagues to support
children’s progress. 
16.6  Furnace Primary School encourages positivity and an inclusive ethos through
the individual support and attention delivered in a small school.   
17 Meeting learners’ needs 
17.1  Through the Getting it Right for Every Child (GIRFEC), practice model,
meeting the needs of every child continues to be a priority and teachers
carefully plan and assess to ensure each child has the opportunity to reach
their potential. Careful tracking and monitoring procedures are in place to
evidence pupil progress. This includes professional dialogue with teachers,
learning discussions with children, classroom and assessment of pupil work.      
17.2  The school also has planned meetings and discussions with parents.  These
discussions between home and school improve parental engagement whilst
focussing on next steps for learning. Where appropriate, intervention is put in
place, while working effectively with other agencies and parents to ensure the
needs of each child are met. Children are achieving appropriate national
expectations in reading, writing, listening, talking and numeracy.   
18 Broadening the Range of Opportunities 
18.1  Children are offered a range of active, planned experiences which help them
develop the knowledge and understanding, skills, capabilities and attributes
which they need for their mental, emotional, social and physical wellbeing both
now and in the future. 
18.2  There is also a strong transition process between Furnace Primary School and
Lochgilphead High School, where staff link closely with colleagues from
Lochgilphead Joint Campus, to support smooth transitions for children moving
on to secondary school. 
18.3  Children are provided with a variety of experiences to develop their sense of
responsibility, independence, confidence and enterprising attitude. 
Opportunities to learn at Inveraray Primary School in aspects of their learning
including Science, Physical Education and weekly outdoor learning expand
those experiences beyond Furnace Primary School.

Page 48

18.4  In Furnace Primary children are engaged with learning and contribute well in
lessons. A strong sense of community exists with pupils and staff co-operating,
communicating and working collaboratively to create a calm, positive centre of
learning. 
19 Environment for Learning 
19.1  Furnace Primary School is a suitably-equipped and well supported school,
situated in the rural village of Furnace. The building is a small traditional
school, well maintained and along with the surrounding forest areas and
access to the beach excellent opportunities for outdoor learning are available.
The building has facilities for pupils and visitors with special access needs.    
19.2  In Furnace Primary School the children maintain links with friends who live in
their own village as well as creating links with children from other rural
communities. 
19.3  Any mitigating effects around the adverse weather and transport issues are
outweighed by the benefits of this proposal. There is no change to the travel
arrangements that are currently in place nor to the environmental impact from
these. The travel distance (sourced from Google maps) from Minard Primary
to Furnace Primary is 3.82 miles via the A83. Travel time is approximately 7
minutes by car. The travel arrangements have been in place for more than
three years.  
19.4  In summary, there are a range of educational benefits for pupils if this proposal
was to be implemented, as summarised in the paragraphs above. The learning
environment in Furnace Primary School offers children the opportunity to learn
within a school with a strong sense of community and personalised learning,
whilst benefiting from opportunities to expand those experiences with
established links to Inveraray Primary. 
20 Assessment of likely educational benefits on other users of  the school’s
facilities 
Implications for staff 
20.1  If this proposal is implemented, there will be no new implications for teaching
and ancillary staff in Furnace Primary School.   
20.2  If this proposal is implemented, the Council does not envisage any adverse
effects from the proposal in respect of staffing.  Should issues arise however,
these will be mitigated through the Council Educational Management Team
support structure.

Page 49

49 
21 Assessment of likely educational benefits on any children who would (in the
future but for implementation) be likely to become pupils of the school. 
Existing and future pupils 
21.1  Children who may live in this catchment area in the future will benefit from the
range of educational opportunities which are presented through this proposal,
as detailed above. 
21.2  There would be positive educational benefits associated with this proposal.
The management arrangements of the school would be strengthened and
there would be opportunities for increasing the range of the curriculum and
increasing the use of active pedagogies.   
21.3  The proposal could support the roll of Furnace Primary School and would thus
extend the peer group for all pupils, present and future.  The larger school
should be able to support a wider range of social and extra-curricular activities.   
21.4  Pupils who would otherwise have attended Minard Primary School, which
consists of one classroom with dining area, corridor with cloakroom, toilets and
office, would benefit from a larger school building of two classrooms plus Hall,
kitchen facilities, toilets and associated offices for Reception and Head
Teacher. Pupils in the combined school will have more shared experiences
and opportunity for friendships across the two rural villages. Developing
connections with Inveraray Primary support the Furnace rural school identity
while benefiting from the extended opportunity links with Inveraray Primary
School. Furnace Primary School meets all the requirements of the Equality Act
2010.   
22 Assessment of likely educational benefits on the pupils of any other
schools in the Council area 
22.1  The current mothballing of the school has had an indirect effect on other pupils
in Argyll and Bute.  The reduction in the running costs for the school means
that this is a saving to the Council, which is not taken from elsewhere. 
However, the annual costs of keeping the school mothballed could feasibly be
better allocated to the benefit of others.  
22.2  There are no other significant impacts from this proposal on other pupils in the
authority or who attend other schools, in either a positive or a negative way. 
Placing requests 
22.3  This proposal will not affect the right of parents to request that their child attend
a school of their choice rather than the designated school in whose catchment
area the family lives as provided by the Education (Scotland) Act 1980.

Page 50

23 Consideration of how to minimise or avoid any adverse effects that may
arise from the implementation of this proposal 
23.1  The main adverse effect from this proposal would be the length of the journey
to school for children who live in the Minard Primary School catchment area.
However, the current arrangements (children from the catchment area
attending either Furnace Lochgilphead or Inveraray Primary Schools) have
been in place since Minard Primary School was mothballed. Funded school
transport would also continue to be provided for pupils to the new catchment
schools should this proposal be implemented.   
24 Summary of educational benefits statement 
24.1  Educational benefits of this proposal, such as the ability for children to
participate in a broad range of experiences, the development of the strategic
leadership of the acting head teacher in taking forward improvements in
learning and teaching, and the ability to meet the educational, social and
emotional needs of the children are significant benefits to this proposal. During
the pre-consultation phase, these benefits were explored in detail and details
from the community engagement and the findings from the preliminary
requirements, to include the alternative proposals and the authority’s
assessment of other likely effects of the proposal and the reasons for that
assessment are attached as Appendix 5.   
24.2  Whilst there are positive educational benefits, there is one negative aspect
identified which arises from the children attending Lochgilphead or Furnace
Primary Schools.  This negative aspect is principally around the fact that
children have to travel by either bus or car to school.  However it is considered
that the positive aspects of this proposal outweigh the negative aspect of some
travelling for children. 
25 Factors for rural school closures 
25.1  The Council has taken special regard to the following factors in relation to this
proposal as Minard Primary School is classified as a rural school. 
The likely effect on the local community if this proposal is implemented    
25.2  The Council has made an assessment on the sustainability of the community
should this proposal be implemented and considers that this may have a
positive impact.

Page 51

51 
25.3  The Scottish Government focuses on four key areas of importance to rural
communities;    
• a strong and diverse rural economy, harnessing traditional strengths
and with an appetite for change, 
• thriving rural communities where everyone can enjoy a decent quality
of life, where the young are not forced to leave their communities to get
on and where the vulnerable are no longer excluded, 
• strong, community focused public services that are accessible, of the
highest possible quality and with the greatest possible choice, 
• a rural Scotland whose natural and cultural heritage flourishes in all its
diversity 
25.4 In rural communities, the challenges and opportunities are largely defined by
the local area and can often best be met by a bottom-up, community-led
response. Strong community leadership is vital to articulating local priorities
and driving forward change and growth.    
25.5 There is the potential if this proposal is implemented to capitalise on the
existing will and drive in this community, with opportunities for local leaders to
enable them to organise, motivate and inspire their neighbours. A portion of
the school grounds were previously acquired by the Minard Community Trust
for purposes in furtherance of the community. In terms of the remainder of the
School property, the Council would be willing to engage with any community
bodies coming forward with an interest or proposals in relation to the same. 
25.6 Research1 has shown that when communities feel empowered, there is: 
• greater participation in local democracy; 
• increased confidence and skills among local people; 
• more people volunteering in their communities; and 
• greater satisfaction with quality of life in the neighbourhood. 
25.7 Within Minard there is Minard Village Hall which is used for community events.
Almost all people who attended the preliminary consultation strongly preferred
that the school building should be retained for community use and not allowed
to fall in to further disrepair.    
25.8 Indeed, the school closure may help to empower the local community should
the community thereafter wish to explore the possibility of an asset transfer
process for the building.  This could have a positive impact on community
sustainability. A portion of the school grounds were previously acquired by the
Minard Community Trust for purposes in furtherance of the community. In 
1 https://www.gov.scot/policies/community-empowerment/

Page 52

terms of the remainder of the School property, the Council would be willing to
engage with any community bodies coming forward with an interest or
proposals in relation to the same.   
On the availability of the school’s premises and its other facilities for
use by the community 
25.9  During the pre-consultation phase, there were differing views on the closure of
the school with the suggestion that the building and adjoining grounds could
potentially be retained for community use. Recently, the Council has entered
into a short term licence with an individual who is using the School’s office
space in connection with their academic studies. Within Minard there is Minard
Village Hall which is used for community events. Most people who attended
the pre-consultation meeting felt that the school building should be retained for
community use and not allowed to fall in to further disrepair, as that would
adversely impact on the aesthetic of the community. 
25.10 It is accepted that a school closure may have an adverse effect on a
community, but a community hub could be an asset to the community. This
could have a positive impact on the sustainability of the community and in
particular the availability of the school’s premises and other facilities for use
by the community. Formal closure of the school would mean that any
developing plans for the future of the building could potentially be progressed.   
The likely effect caused by any different travelling arrangements    
25.11 The travel distance from Minard Primary to Lochgilphead Primary is 13.13
miles via A83. Travel time is approximately nineteen minutes by car. Minard
Primary to Furnace Primary is 3.82 miles via the A83. Travel time is
approximately seven minutes by car. The travel arrangements have been in
place for more than three years. Travel is an accepted aspect of living in the
Minard community 
25.12  Implementation of the proposal would have no effect on the current travel
arrangements of staff and pupils. The closure of Minard Primary School, in
terms of current travel arrangements would have a neutral effect on the
environment. There would be no additional travel costs for children attending
Lochgilphead 3-18 Campus as there is capacity in the current system.   
25.13 It is anticipated that the effect on the travel arrangements of staff and other
users of the facility would not differ materially from that of the pupils accessing
the school. 
Environmental impact 
25.14 Currently three children travel to Lochgilphead Primary School from the Minard
Primary School Catchment area. One pupil travels to Furnace primary. 
Therefore, this option would have a neutral environmental impact on the

Page 53

53 
current position and would have no impact on the current travel arrangements
for staff and pupils.    
25.15 If this proposal was to be implemented there would be little or no impact on the
natural environment. 
26 Financial Impact 
26.1  The full breakdown of the financial analysis is detailed in Appendix 4. Some
of this information has been recalculated since the Options Appraisal was
prepared. In particular the annual cost of mothballing the school has been
recalculated from £8,956 to £10,382. This information gives details on the
estimated cost if Minard Primary School was still to be an occupied and
operational establishment.  However, as Minard Primary School is currently
mothballed, the cost for the mothballing is estimated at £10,382 per year.
Should the school be reopened, occupied and operational, the running costs
per year are estimated at £157,105. 
26.2  Column 2 of Table 1 at Appendix 4 shows the projected annual running costs
of Minard whilst Column 3 shows the additional impact on Furnace Primary as
the receiving school at the time of mothballing.  The annual recurring savings
(or costs) are shown in Column 4. 
26.3  The main elements included within a school budget are teacher employment
costs (i.e. basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel, etc.).
Teacher staffing budgets are calculated on an annual basis and within the
primary sector are determined, taking cognisance of the SNCT class size
maxima, by the number of classes required to provide for the specific number
and age of the pupils in each school. When a school ceases to be operational
the teacher staffing budget is adjusted (at the appropriate time), per
entitlement information from Education HR, with the staffing budget resulting
in a nil value.    
26.4  In line with the national priority of maintaining teacher numbers, the Education
Service operates on the basis that supernumerary teachers are redeployed
and therefore their salary costs still exist with an increase to the receiving
school’s budget. Some of the costs noted in column 3 of Table 1 will not directly
impact on the receiving schools but they will be a cost to the Authority as a
whole, for example school transport, and the costs of maintaining the teachers
previously employed in Minard Primary School. 
26.5  There are currently no annual transport costs for pupils to attend Lochgilphead
Primary School. Transport costs per year to attend Minard Primary School, if
it were to be reopened, are estimated at £1482 per year. Transport costs per

Page 54

year to attend Furnace Primary School would be £1,482 although use of the
service bus would incur no additional transport costs.      
26.6 Table 2 contains the notional 30 year lifecycle costs that would  arise
based on the GIA of the various schools irrespective of the  number of pupils
accommodated. Lifecycle costs are representative of the cost needed to keep
the building in a good state of repair. The cost over the next thirty years
therefore to maintain Minard Primary School £238,140 and for Furnace Primary
School this is £530,955.  
26.7  Table 3 contains the annual running costs during mothballing of Minard
Primary School and these are estimated at £10,382 per year. This includes
non-domestic rates, utility costs, insurances, etc. If the school was to be
formally closed, this would allow further consideration to be given to the future
of the School premises and any transfer in ownership of the same. 
27 Equality and Socio Economic Impact 
27.1 The Council as a public authority has a duty under the Equality Act 2010, the
Public Sector Equality Duty 2011, the Fairer Scotland Duty (Part one of the
Equality Act) and the Islands (Scotland) Act (2018) to have due regard to their
provisions when making strategic financial decisions. This is done through
assessing the potential impact of the decision on equality through Equality and
Socio-Economic Impact Assessments (EQSEIAs). 
27.2 The Council will undertake the process of assessment during the consultation
process in respect of this proposal to ensure that due regard is given to such
matters in the decision making process. A finalised EQSEIA will be produced
alongside the Consultation Report. 
28 Consultation arrangements   
28.1 Prior to formulating a rural school closure proposal under the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended, the Education
Authority must satisfy the preliminary requirements set out in Section 12A of the
2010 Act. The  Authority has previously identified its reasons for
formulating a possible proposal, considered whether there were any reasonable
alternatives to the possible proposal as a response  to those reasons, and
assessed each of the options in  accordance with Section 12A(2)(c) of the
2010 Act. After considering a paper addressing these preliminary requirements,
the Education Authority decided on 25th August 2022 that, having specific
regard to the reasons for formulating a prospective closure proposal, the option
to close Minard Primary School and redraw its catchment areas to Lochgilphead
and Furnace Primary Schools is the most appropriate response to the specific
reasons for the potential proposal.

Page 55

55 
28.2  This document was considered by the Council as Education Authority on 8th
June 2023 when it was agreed that it should be adopted as a relevant proposal
and issued as a basis for consultation.  No decision will be taken by the Council
on the proposal contained in this paper until after the end of the consultation
period. The Council will then receive a report on the consultation and will reach
a view on the proposal. 
28.3  A summary of this document will be issued free of charge to all of the
consultees listed on page 2 of this document and it will also be published on
the Council’s website:      
https://www.argyll-bute.gov.uk/school-consultations-and-proposals     
28.4  As part of a consultation process, the Education Authority must publish the
proposal paper, advertise it and notify Education Scotland and all of the
relevant consultees as prescribed by Schedule 2 of the 2010 Act, inviting them
to make representations on the proposal. The consultation period will be from
15th June 2023 until the close of business on 13th September 2023 which lasts
for a minimum of 6 weeks and includes at least 30 school days. 
28.5    A public meeting will be held at Minard Primary School on 29th August 2023 at
7.00pm. Anyone wishing to attend the meeting and participate is welcome to
do so. The meeting will be convened by the Education Authority and the
Education Authority will present reasons for bringing forward the proposal.
There will be an opportunity for questions to be asked and comments to be
made. A note will be taken so that comments can later be summarised and
considered. However, the Education Authority will also consider written
comments which should be sent to Education Services, School Consultations,
Argyll & Bute Council, Argyll House, Dunoon, Argyll, PA23 8AJ and should be
received no later than 5.00pm on 13th September 2023. 
28.6  Written representations may be made on the proposal and the alternatives to
the proposal. Written representations may also suggest other alternatives to
the proposal. 
28.7  Following the close of the consultation, the Education Authority will provide
Education Scotland with copies of the written representations submitted, a
summary of the oral representations made at the public meeting and any other
relevant documentation. This will allow Education Scotland to prepare a report
on the proposal within a period of 3 weeks. 
28.8  After receiving Education Scotland’s report, the Education Authority will then
prepare and publish a Consultation Report in accordance with Sections 9, 10
and 13 of the 2010 Act. The Education Authority will thereafter make its final
decision on whether to implement the proposal. The decision will be published
a minimum of 3 weeks after publication of the Consultation Report. If the
Education Authority makes a closure decision, it shall notify the Scottish
Ministers within 6 working days of that decision and publish the fact that the

Page 56

Scottish Ministers have been notified, and that representations can be made
to them. The Education Authority would also be required to publish a notice on
its website of the decision to implement the proposal and why it has been
satisfied that closure is the most appropriate response to the reasons for
formulating the proposal.  
28.9  The Scottish Ministers will have a maximum of 8 weeks to call in any closure
decision made by the Education Authority in certain circumstances. This 8
week timeframe would consist of an initial 3 weeks from the date of decision,
during which representations can be made to the ministers, and a further 5
weeks for the Scottish Ministers to decide whether to issue a call in notice.
During this period the Education Authority will not proceed to implement any
closure decision. 
28.10 If the Scottish Ministers call in a closure proposal, it is referred to the Convener
of the School Closure Review Panels. The Convener must constitute a School
Closure Review Panel within 7 days for determination. The Education
Authority may not implement a closure decision in whole or in part until the
Panel has made its determination. It will usually issue a decision within 8
weeks of the Panel being constituted. 
28.11 If the School Closure Review Panel refuses to consent to the closure decision,
or following publication of the Consultation Report the Education Authority
decides not to implement the closure proposal, the Education Authority cannot
publish a further closure proposal in relation to the school for 5 years, unless
there is a significant change in the school’s circumstances. 
29 Conclusion    
29.1  It is proposed that education provision at Minard Primary School be
discontinued with effect from 31st May 2024. The catchment area of
Lochgilphead and Furnace Primary Schools shall be extended to include the
current catchment area of Minard Primary School as identified in Paragraph
2.2 and Appendix 3. 
29.2  It has been assessed that the proposal is the most appropriate means of
addressing the underlying reasons for formulating it, which are: 
• Minard Primary School has been mothballed for over four years. The
school condition will deteriorate with limited budgets for maintenance.
The school roll is currently zero and although there is a small increase
in pupils within the catchment area projected, this is not significant
enough to make the school viable again. The annual cost of the
mothballing of the building is £10,382;  
• Along with several other rural Councils, Argyll and Bute is facing
increasing challenges in recruiting staff. At the time of writing there are

Page 57

57 
8.59 fte primary vacancies for Head Teachers and teachers in Argyll
and Bute; and 
• The Council needs to allocate its resources in a way that ensures the
quality of all of its services. 
Other Considerations 
• This proposal will bring educational benefits to all present and future
users of the affected schools and assist in ensuring that the Education
budget is more sustainable into the future; 
• The costs per pupil in under-occupied schools are excessively high; 
• Schools in the Council area are expensive to maintain and operate; 
• Retaining unnecessary accommodation is a serious drain on the
resources of the Council and diverts spending from areas that directly
affect the educational attainment of pupils; 
• There is no realistic possibility at present of the Council being able to
bring its whole school estate up to a satisfactory condition. The present
condition is unsustainable and can only be improved by reducing the
extent of the estate. 
DOUGLAS HENDRY
Executive Director with responsibility for Education                                                      
Wendy Brownlie
Head of Education: Performance and Improvement 
Councillor Yvonne McNeilly        
Policy Lead for Education                                                     
For further information contact:   
Annette Trevelyan
Education Officer 
annette.trevelyan2@argyll-bute.gov.uk 
16th May 2023

Page 58

APPENDICES 
Appendix 1 - Consultation Letter 
Appendix 2 - Response form 
Appendix 3 - Maps 
Appendix 4 - Financial template 
Appendix 5 - Options Appraisal 
Kilmory,  
Lochgilphead,
Argyll,
PA318RT                                             
Telephone: 01546 605522 
Our Ref:   
E-mail: annette.trevelyan2@argyll-
bute.gov.uk 
Council Website:  www.argyll-
bute.gov.uk   
Minard Primary School    
Dear Consultee, 
Argyll and Bute Council   
Comhairle Earra Ghàidheal agus Bhòid    
Execut ive Director:  Douglas Hendry  
APPENDIX 1

Page 59

59 
Review of Education Provision Notice and Summary of Proposal for closing
Minard Primary School Schools Consultation (Scotland) Act 2010 
Background 
Argyll and Bute Council, through its Education Service, aims to realise ambition,
excellence and equity for all.   
The Council is consulting on a proposal to close Minard Primary School. This notice
provides a summary of a proposal that you may have an interest in or are required
to be notified of, giving you key information about the proposal. 
The Council is conducting a public consultation process. This will commence on 15th
June 2023 and will conclude on 13th September 2023. This is the period within which
you will be able to make written representations to the Council in respect of the
proposal.  If you wish your view to be taken account of in the consultation exercise
you must submit your written representation within this period. This notice and
summary provides further information on where a full copy of the proposal may be
obtained or referenced and also advises on how you can make written
representations to the Council. 
The Council will hold a meeting where officers will be able to provide information on
the proposal.  The details of the public meeting are contained in this notice and
summary. 
It is important that everyone we are consulting tells us what they think of the proposal.
Please read this notice and summary and then consider the contents of the proposal
document. You can then tell us what you think of the proposal by making written
representation and/or by attending the public meeting. This notice and summary tell
you how to do that. 
The Proposal 
It is proposed that education provision at Minard Primary School be discontinued with
effect from 31st May 2024. The catchment areas of both Lochgilphead and Furnace
Primary Schools shall be extended to include the current catchment area of Minard
Primary School. The proposal is that children living in the north section of catchment
area from Achagoyle Bay to Blackstone Bay attend Furnace Primary (with that section
of Minard’s catchment area being subsumed by Furnace Primary School) and
children in the south section of the catchment area from Achagoyle Bay to Kilmichael
Beg attend Lochgilphead Joint Campus (with that section of Minard’s catchment area
being subsumed by Lochgilphead Primary School).

Page 60

Reasons for this proposal 
This is considered to be the best option to address the reasons for the proposals
which are; 
• Minard Primary School has been mothballed for over four years. The
school condition will deteriorate with limited budgets for maintenance. The
school roll is zero and is not predicted to rise in the near future. 
• Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. At the time of writing there are 8.59 fte primary
vacancies for Head Teachers and teachers in Argyll and Bute.    
• Whilst the school is mothballed, the building is deteriorating with limited
budgets for maintenance.     
The Council’s education strategy Our Children Their Future 
Together we will realise ambition, excellence and equality for all. 
• Raise educational attainment and achievement for all, 
• Use performance information to secure improvement for children and
young people, 
• Ensure children have the best start in life and are ready to succeed, 
• Equip young people to secure and sustain positive destinations and
achieve success in life, 
• Ensure high quality partnership working and community engagement, 
• Strengthen leadership at all levels. 
Alternatives to the Proposal 
The following alternatives to the proposal were considered at the preliminary pre-
consultation stage of this process;   
a) Re-open Minard Primary School, 
b) Continued Mothballing of Minard Primary with the pupils zoned to
Lochgilphead and Furnace Primary Schools, 
c) Close Minard Primary School and realign its catchment area to
Lochgilphead and Furnace Primary Schools (the Proposal). 
Written representations may be made on those alternatives as well as on the
proposal.

Page 61

61 
Written representations on the proposal may suggest other alternatives to the
proposal. 
What will we do? 
We will consult with people by: 
▪ Providing a notice of the consultation and a summary of the proposal to the
relevant consultees this is that notice and summary 
▪ Placing an advert in the local press 
▪ Putting information on our website https://www.argyll-
bute.gov.uk/schoolhttps://www.argyll-bute.gov.uk/school-consultations-and-
proposalsconsultations-and-proposals 
▪ Holding a public meeting to explain the proposal 
▪ Ask parents, carers, children, young people, teachers, support staff and
others to tell us what they think of the proposals. 
What to do now? 
▪ Please read the full proposal document 
▪ Please attend the Public Meeting which will be held on 29th August 2023 at
7.00pm in Minard Primary School.  
▪ Let us know what you think by: 
Letter to:  Education Services 
School Consultations     
Argyll & Bute Council 
Argyll House 
Alexandra Parade 
Dunoon       
PA23 8AJ 
Returning the attached response sheet by post or by; 
Email to:  argyllhousereception@argyll-bute.gov.uk                     
What next? 
Whilst the Council is engaging in a consultation process in relation to this proposal
that does not mean that the proposal will go ahead. It does mean that the Council is
engaging in a consultation process to seek your views on the proposal. 
All the points raised during the consultation will be carefully considered and Elected
Members will then decide if the plan should go ahead.

Page 62

If the suggestion goes ahead, any children from Minard Primary School catchment
area would be educated at Lochgilphead Primary School or Furnace Primary School. 
Please note that this summary document is for convenience only.  Full details of the
consultation can be obtained from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochgilphead Library, Lochgilphead Community Centre, Manse Brae,
Lochgilphead, PA31 8XQ 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD 
• Lochgilphead Primary School, Manse Brae, Lochgilphead, Argyll PA31 8SY 
• Furnace Primary School,  Furnace, By Inveraray, Argyll PA32 8XU
• Minard Village Hall, Minard, By Inveraray, Argyll PA32 8YB   
• It is also available electronically via our website: 
https://www.argyll-bute.gov.uk/school-consultations-and-proposals     
Yours faithfully, 
DOUGLAS HENDRY 
Executive Director with responsibility for Education

Page 63

63 
APPENDIX 2 
Argyll and Bute Council Education 
RESPONSE FORM 
I wish my response to be considered as confidential with
access restricted to Elected Members and Council
Officers of Argyll and Bute Council. 
Proposal 
It is proposed that: 
Education provision at Minard Primary School be discontinued with effect from 31st
May 2024. The catchment areas of Lochgilphead and Furnace Primary Schools
shall be extended to include the current catchment area of Minard Primary School
– to the extent that the north section of Minard’s catchment area (from Achagoyle
Bay to Blackstone Bay) will be subsumed by Furnace Primary School; and the south
section of Minard’s catchment area (from Achagoyle Bay to Kilmichael Beg) is
subsumed by Lochgilphead Primary School. 
This part of the form must be completed for a valid response: 
Name: (please print)  Address: 
Post Code: 
I agree/do not agree (delete which does not apply) that my response can be made
publicly available 
Signature:  Date: 
YOUR INTEREST: (please tick) 
Parent    
Child /  
Young
Person 
Staff                 Other  *     
Elected Member / MSP / MP      Member of Community
Council   
*Other: (please specify)

Page 64

Please state your views on the proposal (continue overleaf if necessary)

Page 65

65 
APPENDIX 3 - MAPS 
MAP OF CURRENT PRIMARY SCHOOL CATCHMENT
AREAS 
MAP OF PROPOSED MINARD CATCHMENT SUBSUMED
TO FURNACE AND LOCHGILPHEAD PRIMARY SCHOOLS

Page 66

APPENDIX 4 – FINANCIAL TEMPLATE    
Table 1
Column 1 Column 2 Column 3
Column
4
Current revenue costs for school proposed for closure  
Name of School
Minard Primary
Costs for
full
financial
year
(projecte
d annual
costs)
Additiona
l financial
impact
on
receiving
school
Furnace
Primary
Annual
recurrin
g
savings
(column
2 minus
column
3)
School costs      
Employee costs - note 1      
teaching staff 106,384 111,704 -5,320
support staff 20,131 0 20,131
teaching staff training (CPD etc)     0
support staff training     0
Supply costs - note 2 3,129 0 3,129        
Building costs:      
property insurance 651 0 651
non domestic rates 1,648 0 1,648
water & sewerage charges 291 0 291
energy costs 8,474 0 8,474
cleaning (contract or inhouse) 278 0 278
building repair & maintenance 3,245 0 3,245
grounds maintenance 842 0 842
facilities management costs - note 6 122 0 122
revenue costs arising from capital     0
other - refuse collection; telephones 1,459 0 1,459        
School operational costs:      
learning materials 2,757 44 2,713
catering (contract or inhouse) 6,211 170 6,041
SQA costs 0 0 0
other school operational costs (e.g. licences) 0 0 0      
0
Transport costs: note 3

Page 67

67 
home to school  0 0 0
other pupil transport costs 1,482 2,964 -1,482
staff travel  0   0
SCHOOL COSTS SUB-TOTAL 157,105 114,882 42,223        
Income:      
Sale of meals -105 -70 -35
Lets 0 0 0
External care provider 0 0 0
Other       0
SCHOOL INCOME SUB-TOTAL -105 -70 -35        
TOTAL COSTS MINUS INCOME FOR
SCHOOL 157,000 114,812 42,188    
UNIT COST PER PUPIL PER YEAR 52,333 38,271 14,063                                      
2 This figure is based on current financial costs if transport was necessary to
be provided. 
Table 2 
Capital costs
School
proposed
for closure 
Minard
Primary
Receiving
school 
Furnace
Primary
Capital Life Cycle cost - note 7 238,140 530,955
Third party contributions to capital costs 0 0 
Table 3 
Annual Property costs incurred (moth-balling) until disposal
property insurance 651
non domestic rates  1,648
water & sewerage charges 291
energy costs 2,542
cleaning (contract or inhouse) 0
security costs 0
building repair & maintenance 0
grounds maintenance 842
facilities management costs 3,302

Page 68

Other - Routinely check drainage (gutters, downpipes);
cleaning equipment; phone lines 1,106
TOTAL ANNUAL COST UNTIL DISPOSAL 10,382 
Table 4 
Non-recurring revenue costs
Securing building 7,150
TOTAL NON-RECURRING REVENUE COSTS 7,150 
Table 5 
Impact on GAE   
0
GAE IMPACT 0

Page 69

69 
APPENDIX 5 
EDUCATION 
OPTIONS APPRAISAL 
MINARD PRIMARY SCHOOL

Page 70

1.    INTRODUCTION
1.1  On 10th December 2019, Argyll and Bute Council approved the continued
mothballing on a temporary basis of Minard Primary School. There have been no
pupils attending the school since October 2018, and as such, the school had been
de facto mothballed since that time. The Council agreed at that time that the
mothballing of Minard Primary School be continued on a temporary basis until
December 2020, and that the School premises be retained during this time on a care
and maintenance basis. The Council further agreed that in the intervening period,
Education Services would gather the necessary information, identify all reasonable
options in order to consider the future of Minard Primary School in accordance with
the preliminary requirements of the Schools (Consultation) (Scotland) Act 2010. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=8513&Ver=4 
Further to this, on 8th December 2020, the Community Services Committee agreed
that Minard Primary School would continue to be mothballed on a temporary basis
until May 2021 and that the school premises be retained during this time on a care
and maintenance basis. It was also agreed by the Community Services Committee
that in the intervening period, Education Services would undertake a pre
consultation meeting as part of the preliminary work and options appraisal process
when it was permissible under the Coronavirus Regulations relating to public
gatherings. The Education Service intended to undertake the required preliminary
consultation and an options appraisal, for Minard Primary School in May 2021 but due
to the restrictions of the pandemic were unable to complete this work until the last term. 
https://www.argyll-
bute.gov.uk/moderngov/ieListDocuments.aspx?CId=548&MId=13970&Ver=4 
The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 as amended by the Children and Young People
(Scotland) Act 2014. 
The Act, as amended, contains a presumption against closure of a rural school and
details specific requirements which the education authority is required to follow if
they are formulating a proposal to close a rural school. This includes the introduction
of a preliminary consultation process. 
In addition, the Community Empowerment (Scotland) Act 2015 sets out a new right
for community organisations to request the transfer of local assets into local
community ownership/management. Public bodies, including councils, must
consider such requests and respond to them within a reasonable timescale. 
Minard Primary School has had zero pupils enrolled since October 2018.

Page 71

71 
On 8th December 2020, Community Services Committee agreed that the Education
Service would undertake the preliminary requirements in relation to considering a rural
school closure and look at an options appraisal for Minard Primary School. This review
will enable the Education Service to identify and consider the options put forward. 
The 2010 Act makes special arrangements in regard to rural schools that is in effect
a presumption against their closure.  There is a requirement to have special regard
to the rural schools factors prior to formulating a proposal to close a rural school. In
particular, it is necessary to consider any reasonable alternatives before considering
closure. It is also necessary to consider the impact on the wider community of a
potential closure and the impact of any different travel arrangements. These factors
have been considered in this options appraisal. 
2.  REASONS FOR THE PROPOSAL
2.1  An authority that is contemplating formulating a rural school closure proposal must
satisfy the preliminary requirements set out in section 12A of the 2010 Act before
starting to prepare its proposal paper. In particular, it must identify the underlying
reasons why the future of the School is being considered, which are as follows: 
1. Minard Primary School has been mothballed for four years. The school roll was
very low and not predicted to rise in the near future. This continues to be the
situation. 
2. Along with several other rural councils, Argyll and Bute is facing increasing
challenges in recruiting staff. In June 2022 there were 15.49 vacancies for both
Head Teachers and Teachers. 
3. Whilst the School is mothballed, the building is deteriorating with limited budgets
for maintenance.
The Council is therefore considering the future of Minard Primary School. The
various options are explored within this paper. 
3.  BACKGROUND
Argyll and Bute is an area of outstanding natural beauty sitting within an ancient
landscape with a strong cultural identity. Today, the culture of Argyll and Bute is
reflected in its traditional industries of fishing, farming and crofting, sports such as
shinty and in its world class musicians and artists as well as its modern commercial
industries such as wind turbine production and fish farming. Tourism also lies at the
centre of the economy. 
Argyll and Bute is geographically the second largest authority in Scotland. Education
is delivered in a range of settings including schools, partnerships and youth
services.

Page 72

72 
3.1  Argyll and Bute Corporate Plan
The Argyll and Bute Corporate Plan identifies Argyll and Bute as an area of Scotland
with outstanding places, people and potential for a prosperous future for everyone.
Our Council along with our Community Planning Partners, is committed to ensuring
that Argyll and Bute’s Economic Success is built on a growing population. 
This strategic approach embraces the vision for our area, our communities and our
people as outlined in the Corporate Plan. Our key service priorities support the
delivery of our commitments in the plans, helping to focus on local outcomes that
will achieve meaningful improvements for the area, our local communities and our
citizens. 
Councils have a statutory responsibility in terms of the Local Government in
Scotland Act 2003 to achieve best value. Our Community Services Asset
Management Plan provides a review of the property assets used to deliver services.
It incorporates the School Estate Management Plan which reflects the local
implementation of Building Better Schools: Investing in Scotland’s Future, the
national school estate strategy developed by the Scottish Government in
conjunction with local authorities. 
The aspirations, guiding principles and objectives contained within Building Better
Schools are reflected throughout Education and Children’s Services Asset
Management Plan (SAMP) for schools and public buildings, both in the
management of the existing assets and in the design and construction of
developments. 
3.2  Our Children Their Future
Councils, as an Education Authority, have a statutory duty in terms of the Education
(Scotland) Act 1980 to make adequate and efficient provision of school education
across their entire area for the current school population and future pattern of
demand. This is reflected in Our Children, Their Future: Education Vision and
Strategy. 
3.3  Minard and the Local Area – the Minard Primary School Setting
Minard lies on the western shore of Loch Fyne, with beautiful views and 4 miles
southwest of Furnace. Minard Castle lies a mile to the south. Minard is a linear
village of just under 2 miles long, with loch side bungalows, along the A83 road to
the south is the school, church, village hall and several older cottages. Minard was
originally part of the estate of Minard Castle before becoming an independent
village. 
Minard is approximately 13.13 miles away from Lochgilphead and 20 minutes travel
time.

Page 73

73 
3.4  The School within the Community
Minard Primary School was previously very active within the community. Pupils
would often use the local area for outdoor learning, including Crarae Gardens and
also work with local businesses and other cluster schools. The school has not been
used by the local community since it has been mothballed and there has been one
request locally to use the grounds recently. The request was made in May 2022 by
a representative of a local parent and baby/toddler group. 
3.5  Population
Argyll and Bute has an average population density of just 0.13 persons per hectare.
This coupled with the changing demographic profile of the area presents one of our
greatest challenges. The table below refers directly to the Minard area showing the
changing population from census 2001 to census 2011: 
Table 1: Population Information
Minard Area Census Ref : Data from Scotland’s Census website
2001 2011
Total Resident
Population
70 Total Resident
Population
71
% under 16 15.7
1
% under 16 14.1
% 16 – 64
(pensionable age)
57.1
4
% 16 – 64 (pensionable
age)
59.2
%  pensionable age
and over
27.1
4
%  pensionable age and
over
26.8 
It is recognised that the census area and the catchment area Minard Primary School
differ slightly. 
3.6  Development and House Building
A new Local Development Plan (LDP2) is now available, which sets out planning
and development proposals for the next 10 years from 2020 and a vision for 20
years.  The Argyll and Bute Local Development Plan provides the local planning
framework for the Council area, excluding the Loch Lomond and Trossachs National
Park area. The Plan is divided into the written statement and proposals maps. The
written statement provides the general policy context against which planning
applications for new development proposals should be assessed. This is supported
by the proposals maps which show the range of development opportunities and
constraints within the area, for example:
• the key development areas i.e. the allocations for housing, industry and
business, community facilities and infrastructure;
• the potential areas for future development (Potential Development Areas);

Page 74

74 
• areas requiring actions such as environmental improvement or regeneration
(Areas for Action); and
• environmental designations such as national Scenic Areas, Sites of Specific
Scientific Interest (SSSIs), Special Protection Areas and Local Nature
Conservation Sites.
Appendix 1 shows the LDP 2 for Minard. 
Appendix 2 shows the LDP 2 for Furnace.
Appendix 3 shows the LDP 2 for Lochgilphead areas
Appendix 4 provides the key for Local Development Plans. 
3.7  Minard Primary School
The school is situated in the village of Minard, on the shores of Loch Fyne, in Mid-
Argyll, on the A83 between Inveraray and Lochgilphead.
The school, which was purpose built to deliver education, in 1871, is of traditional
rural design. 
The Council's title to the building was obtained from Thomas Owen Lloyd in favour
of the School Board of the Parish of Glassary, dated 22 February and recorded GRS
(Argyll) 19th March, both 1906.Legal Services and Estates indicate there is a burden
in the title from 1906 to the effect that the subjects are to be used for educational
purposes and for no other purpose. However Conveyancing Team within Legal
Services have investigated and in providing a copy of the title plan it clearly shows
that the area of ground in question was in fact within the Council's school title and it
was transferred to the Community Trust in 2006. 
The building itself comprises one classroom with dining area, corridor with
cloakroom, toilets and office. The school is well equipped with disabled access and
facilities. 
The school is co-educational and non-denominational and has a catchment area
extending from Crarae Gardens to Nursery Cottages in Minard village. 
Appendix 5 shows the Minard Primary School Floor Plan. 
Minard Primary School is 13.13 miles from Lochgilphead Joint Campus. Minard
Primary is 3.83 miles from Furnace Primary. The area is sparsely populated. All
three schools are situated along the A83.

Page 75

75 
The Scottish Government’s Rural School List 2017 classifies Minard Primary School
as ‘very remote rural’.  This is defined as an area with a population of less than
3,000 people, and with a drive time of over 60 minutes to a settlement of 10,000 or
more. Minard Primary is one of 6 primary schools that has children transferring to
secondary education at Lochgilphead High School. 
3.8  Furnace Primary School and Lochgilphead Joint Campus
Following the mothballing of Minard Primary School, children living within the
catchment area attended Furnace Primary School or Lochgilphead Joint Campus.
Furnace Primary School is a non-denominational and co-educational school
situated in the village of Furnace off the main A83 road. Furnace Primary school is
a small rural school which occupies a central position in the village of Furnace. It
currently has a significantly falling roll, with 8 children expected to be attending the
school in August 2022. The school will have a shared Head Teacher with Inveraray
Primary from August 2022. 
Appendix 5 shows the Minard Primary Floor Plan 
Appendix 6 shows the Lochgilphead Joint Campus Floor Plan 
Appendix 7 shows the Furnace Primary Floor Plan 
Furnace and Lochgilphead Joint Campus buildings have facilities for pupils, visitors
and special access needs. The Scottish Government’s Rural School List 2017
classifies Furnace Primary School as ‘very remote rural’. Lochgilphead Joint
Campus is the associated Secondary School for Furnace and Minard Primary
Schools and classified as ‘remote rural’. 
The Map below shows the adjoining catchment areas of Minard and Furnace
Primary Schools and Lochgilphead Joint Campus Catchment Areas:

Page 76

76 
© Crown copyright and database right 2022. All rights reserved. Ordnance Survey
Licence number 10002336 
3.9  Pupil Numbers
Pupil projections, and data for 2021-22 are based on the 2018 pupil census, a return
prepared annually for the Scottish Government. Past pupil numbers are historic data
from past pupil censuses. Pupil projections for future P1 intakes are from NHS data
taken from children registered with GP practices in the area. This data is
anonymised. 
Table 2 shows the historic and current pupil numbers for Minard, Furnace and
Lochgilphead Primary schools: 
Table 2:  Minard PS  Furnace PS Lochgilphead
PS  
Roll Roll Roll
Capacity 33 50 249
2011-2012 10 21 213
2012-2013 9 18 221

Page 77

77 
2013-2014 6 12 231
2014-2015 8 10 230
2015-2016 6 7 233
2016-2017 5 7 221
2017-2018 1 6 221
2018-19 3 13 227
2019-20 0 10 226
2020-21 0 12 207 
Table 3 shows projected rolls for Furnace and Lochgilphead Primary  Schools and
estimated numbers of pupils in the Minard Primary School catchment area
according to figures held by Argyll and Bute Council:    
Table 3:  Minard PS Furnace PS Lochgilphead PS  
Roll Roll Roll
Capacity 33 50 249
2022 -2023 6 7 192
2023 -2024 4 7 189
2024-2025 2 10 191 
* A prediction based on information available June 2022 
4.  COMMUNITY ENGAGEMENT 
4.1  Meetings
A Community ‘drop in’ Engagement session was held in Minard Primary School, on
19th May 2022 from 9.30am-6pm.  This was to seek the views of the community on
the future of Minard Primary School. Members of the community could ‘drop in’
throughout the day and give their views to Education Officers and receive
information on the Pre-consultation process. This session was attended by 19
people. Notes from this session with comments from the community can be found
in Appendix 8. There were also meetings in Furnace and Lochgilphead Primary
Schools to gather opinions from the young people from within the catchment area
for Minard School. The Education Officer leading the Pre-consultation met with the
children during May 2022 so that they could contribute to the process and their views
are reflected in the paper. 
4.2  Content of Meetings 
Attendees at the meetings were given an overview of the information that the
Council would be using in this Options Appraisal, this included previous pupil rolls,

Page 78

78 
pupil projections, background information and details of the pre-consultation
process. 
The questions were as follows: 
Over the last three years, what has been the effect of mothballing Minard School on
you, your family and community? 
In your view what are the pros/cons of the following options:
• Continue with mothballing
• Re- open the school
• Close the school 
Attendees also noted questions regarding the future of the school, and points of
information that should be considered in the Options Appraisal. 
4.3  Feedback 
There was a range of viewpoints on the future of Minard School:
• Community and Parents
The majority of the community acknowledged how the future of the school
needed to be considered now. Many understood that in order to be a
viable option for schooling, there was an agreement that the low numbers
of children did not make the re-opening of the school realistic.  There was
a small percentage of people in support of continued mothballing in order
to retain the building in case of future need. One family of children
currently attending another school locally were keen that the school
should re-open; while other families are satisfied with the current
arrangements of their children attending a bigger school. 
• Children/young people
A few of the children expressed their desire to attend Minard Primary
School however, the majority of children voiced they loved being at
another primary school but that closing the Minard Primary School made
sense to them, due to small numbers of children involved. 
• Staff
Staff members were sad at the thought of the School being closed but
acknowledged that without a significant number of pupils re-opening the
school is not viable. 
General Comments:

Page 79

79 
“This was a vibrant school at the heart of the community. When my children came
here – there were 30 children here. Those children have gone on to be very
successful. They also have a community minded approach to life. Children gain so
much from the community that is valuable. How can that be provided by a bigger
community? When the children were here, they would feel the support from the other
members of the community.” 
“There was such a pride in the school – with different activities, including coffee
mornings – the whole community supported the children in many ways. 
When you have an education in a school like this, it stays with you.” 
“Not enough children in the locality for the school to be opened as an educational
establishment.” 
5.0  THE PROPOSAL AND REASONABLE ALTERNATIVES TO THE PROPOSAL AS
CONSIDERED BY THE COMMUNITY ENGAGEMENT
Minard Primary School has been mothballed for 3 years. The school roll was very
low and not predicted to rise significantly in the near future. This continues to be the
situation. There is concern about the future of the school and a collective wish within
the community for it to re-open, but also an understanding that the numbers of young
children locally means that this may not be viable. 
Whilst the building is mothballed it continues to deteriorate. The Community would
like to see the building put to good use. Along with several other rural councils, Argyll
and Bute is facing increasing challenges in recruiting staff. In June 2022 there were
15.49 fte vacancies for both Head Teachers and Teachers. 
The Council is required to consider the future of Minard Primary School. The
following options are explored within this paper: 
a) Re-open Minard Primary School.
b) Continued Mothballing of Minard Primary with the pupils zoned to Furnace
Primary School.
c) Close Minard Primary School and realign its catchment area to Furnace and
Lochgilphead Primary School.
6. OPTION A: RE-OPEN MINARD PRIMARY SCHOOL 
6.1  Community Feedback
Ten community members who attended the Pre-consultation meeting were in favour
of the school opening but felt it was linked to ensuring there is affordable housing in
the area to attract more families. After school care was also a feature in meeting the
needs of families and the feasibility of the school re-opening. The previous success
of the school was recognised and there was some feeling that this should be

Page 80

80 
available for the next generation. There was recognition that the school was at the
heart of the community and the community have lost local amenities and concern
that the village will lose its vibrancy and become less sustainable. There were also
community members who felt that the numbers of children on the roll were so low
now and in the future that a local village school was sadly no longer viable. 
“There needs to be sufficient numbers of children in the school so that a child is not
there on their own.” 
“If folk know if there is a school in the village area – it may attract more people here
– there were only ever good reports about the school and former pupils should be
able to access the school. The village needs new life rather than the older
demographic – we need to attract new younger members of the community.” 
“There are not any children to make it viable at the moment.” 
“As a parent, I would send my child to Minard PS. The community want the school
to open but the question would be if other parents would send their child to Minard.
After school provision is an issue. A school makes a community. Everything has
already closed here. The sense of isolation as a young family……I don’t see anyone
in the community.” 
Why has this happened? I find this very upsetting to look at the school like this – I
know there are not a lot of children in the village but could the school be used for
adult purposes too? 
6.2 Pupil Numbers
If the school were to reopen in August 2022, the maximum pupil numbers from the
catchment would be six. It has been stated that without a viable number of pupils
for the school, some parents would not be considering placing their children at
Minard Primary School if it were to re-open. 
If the school were to re-open sustainability may not be viable due to the fact that
pupil numbers over the next four years are not predicted to rise, indeed they would
decline further and are well below the capacity of the school building. 
Table 4: Pupil Numbers
Minard
Primary
2021/202
2
2022/20
23
2023/202
4
2024/202
5
2025/2026
Approve
d
Capacity
33 33 33 33 33

Page 81

81 
Roll
Projectio
n
6 6 4 2 1 
6.3 Financial Information
The total amount including employee; premises; supplies and services and catering
consideration to re-open the school is £137,511. 
The annual cost of mothballing Minard Primary School is £8,956. 
The cost to bring the educational building to an acceptable standard to re-open the
school is £36,500.  The cost to open the school house, if required, to an acceptable
standard would be £21,500. 
6.4  Assessment of Rural Factors 
The reasons why the future of Minard Primary School is being considered are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Minard Primary School to increase significantly without development in affordable
housing. Minard Primary School is currently mothballed and at the time of writing,
there are 7 current pupils in the Minard catchment area. To reopen the school would
not necessarily increase the pupil numbers.   
6.4.1  Community Impact
The reopening of the school would more easily allow the school’s premises
to be used by the community. It would also be a possibility that the school
pupils would invite the community to specific events. The presence of a
school and the facilities/activities that may be offered could make the area a
more attractive place to live. Reopening the school may therefore encourage
families with school age children to move to the community. This in turn may
make the community more sustainable. 
Many who attended the community engagement indicated the need for the
school premises to be used for a community purpose in the future if it did not
re-open. 
Respondents noted the negative impact of the school mothballing on the
community as:
• The continued deterioration of the building. 
• Schooling not being available within the village may be a factor in not
attracting and retaining young families to the area.  
• A lack of focus for significant aspects of community life that the school
previously provided for all generations within the community.

Page 82

82 
If the school were to reopen as an educational establishment there would be
an economic impact with respect to the considerable expenditure needed to
bring the building up to standard.  There would also be costs relating to
staffing, and ongoing maintenance.  The reopening of the school and the
potential relocation of families may have a positive effect on the wider
economy of the community. 
6.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Minard Primary to
Furnace Primary is 3.82 miles via the A83. Travel time is approximately 7
minutes by car. The travel arrangements have been in place for more than
three years. 
The travel distance (sourced from Google maps) from Minard to
Lochgilphead Joint Campus is 13.13 miles via the A83. Travel time is
approximately 19 minutes by car. Travel is an accepted aspect of living in the
Minard community. 
If Minard Primary School was to reopen there could be a positive impact on
the health and wellbeing of pupils who are able to walk or cycle to school.
Staff would either travel to the school by car, or if they live locally could walk
or cycle. There may be a positive environmental impact as the use of vehicles
to transport pupils may decrease. Conversely, there could be increased car
usage by staff which may mean these travel arrangements have a negative
environmental impact. The respective positive and negative impact may
therefore balance.   
6.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits from reopening the school as all schools implement
Curriculum for Excellence ensuring effective learning and teaching which is
matched to the needs of children. 
With respect to outdoor learning community spaces could be used either in the
school grounds or in the immediate neighbourhood if the school were to reopen. 
Outdoor learning is provided by all schools. 
There would be issues with respect to the current condition and suitability of the
school buildings and facilities which would negatively impact learning and teaching.

Page 83

83 
6.6  Summary 
Some community members, including some parents, are in favour of re-opening the
school. Others recognised that the school may not be viable due to low pupil
numbers. If the school reopened, pupil numbers would be low and are currently
projected to decline further. 
There are financial implications if the school is to be reopened.  The total amount
including employee; premises; supplies and services and catering consideration to
re-open the school is £137,511 with the cost to bring the property to an acceptable
standard to re-open the school is £36,500.  The cost to open the school house, if
required, to an acceptable standard would be £21,500. 
If the School was to be reopened, the premises would be able to be used by the
community, in addition to its use as an educational facility. The reopening of the
School may encourage families with school age children to move to the community,
which may make the community more sustainable. 
The travel distance (sourced from Google maps) from Minard Primary to Furnace
Primary is 3.82 miles via the A83. Travel time is approximately 7 minutes by car.
The travel arrangements have been in place for more than three years. 
The travel distance (sourced from Google maps) from Minard to Lochgilphead Joint
Campus is 13.13 miles via the A83. Travel time is approximately 19 minutes by car.
Travel is an accepted aspect of living in the Minard community. If Minard Primary
School was to reopen there could be a positive impact on the health and wellbeing
of pupils who are able to walk or cycle to school. Staff would either travel to the
school by car, or if they live locally could walk or cycle. There may be a positive
environmental impact as the use of vehicles to transport pupils may decrease.
Conversely, there could be increased car usage by staff which may mean these
travel arrangements have a negative environmental impact. The respective positive
and negative impact may therefore balance. 
There are no specific educational benefits from reopening the school as all schools
implement Curriculum for Excellence ensuring effective learning and teaching which
is matched to the needs of children. 
When considering projected low pupil numbers, the challenges in recruiting teaching
staff and the considerable expenditure needed to bring the building up to standard,
these need to be balanced against some members of the community’s  opinion on
whether the school should re-open or not. For these reasons, this is not considered
to be a reasonable option.

Page 84

84 
7.  OPTION B: CONTINUED MOTHBALLING OF MINARD PRIMARY SCHOOL
WITH PUPILS ZONED TO FURNACE PRIMARY SCHOOLS 
The Statutory Guidance for the 2010 Act, in relation to mothballing, states “the
maximum length of its duration is likely to depend on the location of the school and
the desirability of maintaining capacity to re-open a school there, but it is unlikely
that it should exceed 3 years in areas that are not very remote.” Minard Primary
School has been mothballed for 4 years. 
It should be noted that part of this time has been during a pandemic and the Council
had hoped to consider options for the school previously, but this was curtailed due
to restrictions. 
7.1  Community Feedback
There are many ideas for the future of the building being taken forward by the
community as a hub for community life. Some members of the community felt that
the school should continue to be mothballed to see if in the longer term more families
would move into the area post-COVID. There was a significant view at the
community meeting that mothballing the school over a long period is wasteful due
to deterioration of the property and should not be prolonged. It was hoped that a
decision about the future of the school, whatever it may be would be taken in the
near future. 
“Mothballing the school has had a huge impact on community cohesion.” 
“Families have been forced into going elsewhere and now they don’t know what they
are missing.” 
“No focal point left for the village.” 
“Would encourage a decision to be made about the future of the building and
grounds sooner rather than later.” 
“Should we continue to mothball to see how post-pandemic living impacts on
choices open to parents? The increase in home working could make the local school
more viable?” 
“Could the school be used by the community in a more productive way whilst
mothballed?” 
7.2 Pupil Numbers
Pupil numbers are not projected to increase over the next 4 years, they will be in
decline, as per Table 4 above.

Page 85

85 
7.3  Financial Information
The current annual cost (2021/22) to the Council of the mothballed Minard Primary
School is £8,956. This includes electricity, heating oil, and ground maintenance but
does not include building maintenance and repair costs. Neither does it take account
of the cost to bring the property to an acceptable standard to re-open the school
which is £36,500.  Current annual transport cost of taking pupils to alternative
schools is £1,482. 
7.4  Assessment of Rural Factors 
The reasons why the future of Minard Primary School is being considered are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Minard Primary School to increase significantly. Minard Primary School is currently
mothballed and although there are currently no registered pupils, pupils would be
rezoned to another local school. To reopen the school would not increase the pupil
numbers. 
7.4.1  Community Impact
If pupils are to continue their education in other primary schools whilst Minard
Primary School remains mothballed there would be no change to the current
impact on the community. While some families are satisfied with current
arrangements, others report to feeling isolation.  If the mothballing of Minard
Primary was to continue the building would deteriorate further and eventually
become unavailable. This could have a detrimental effect on the
sustainability of the Minard community. At present the school grounds are
available for community use.  The community view the buildings and grounds
as an opportunity to develop as a community and there were multiple
suggestions for possible usage, as outlined in Appendix 8. This may make
the area a more attractive place to live. 
7.4.2  Travel Arrangements
There is no change to the travel arrangements that are currently in place nor
to the environmental impact from these.  The travel distance (sourced from
Google maps) from Minard Primary to Furnace Primary is 3.82 miles via the
A83. Travel time is approximately 7 minutes by car. The travel arrangements
have been in place for more than three years. 
Some parents in the current catchment area have chosen to have their
children attend Lochgilphead Joint Campus as they work within that
community. The travel distance (sourced from Google maps) from Minard
Primary to Lochgilphead Joint Campus is 13.13 miles via the A83. Travel time
is approximately 19 minutes by car. Travel is an accepted aspect of living in
the Minard community. Continued mothballing of Minard Primary School

Page 86

86 
would have no effect on current staff travel. The small number of children has
minimal effect on staffing within the receiving primary schools. 
7.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits from reopening the school as all schools implement
Curriculum for Excellence ensuring effective learning and teaching which is
matched to the needs of children. 
Minard, Furnace and Lochgilphead are remote rural schools. Minard and Furnace
Primary Schools are set within a very remote rural area, Lochgilphead Primary is
classified as a remote rural school (Scottish Government classification October
2021). Children from Minard area, attending Furnace and Lochgilphead Primary
School are benefitting from the rural broader environment, whilst not moving their
learning to a school that is completely different to their home environment. 
The co-location of the nursery and the primary classes at Lochgilphead Primary
enhances the transition process for the children moving from Nursery into Primary
one, through joint educational processes and liaison between the two settings.
Transition to secondary school is enhanced through joint planning and educational
experiences. 
7.6  Summary
The majority of people who attended the consultation were not in favour of further
continuing the mothballing of Minard Primary School. A few people felt it would be
beneficial to mothball for longer as there was a possibility of attracting more young
families to the village post-COVID. There was a significant view at the community
meetings that mothballing the school over a long period was wasteful due to
deterioration of the property and potentially affected sustainability of the community.
Pupil numbers are not predicted to rise significantly in terms of pre-school children
living within the catchment area, indeed they are in decline. Mothballing had no
positive impact on the reasons for the proposal. 
The current annual cost (2021/22) to the Council of the mothballed Minard Primary
School is £8,956. This includes electricity, heating oil, and ground maintenance but
does not include building maintenance and repair costs. Neither does it take account
of the cost to bring the property to an acceptable standard to re-open the school
which is £36,500.  The current annual transport cost of taking pupils to alternative
schools is £1,482.

Page 87

87 
The travel distance (sourced from Google maps) from Minard Primary to Furnace
Primary is 3.82 miles via the A83. Travel time is approximately seven minutes by
car. The travel arrangements have been in place for more than three years. Some
parents in the current catchment area have chosen to have their children attend
Lochgilphead Joint Campus as they work within that community. The travel distance
(sourced from Google maps) from Minard Primary to Lochgilphead Joint Campus is
13.13 miles via the A83. Adverse weather can be a factor, however this is the same
for other local schools and areas.  Should the school continue to be mothballed
these travel arrangements would continue. 
There are no specific educational benefits from continuing the mothballing of Minard
Primary school. 
On the basis that pupil numbers are declining and the building’s mothballing is not
of benefit to the community or the Council, continued mothballing of Minard Primary
School is not viewed as a reasonable option. 
8.  OPTION C: CLOSE MINARD PRIMARY SCHOOL AND REALIGN THE
CATCHMENT AREA FOR FURNACE AND LOCHGILPHEAD PRIMARY
SCHOOLS TO INCLUDE THE CURRENT MINARD CATCHMENT AREA 
9.1  Community Feedback
Some people who attended the Options Appraisal meeting were not in favour of
reopening Minard Primary as a school. They commented that there were not enough
children to support re-opening the School. Additionally, with respect to low numbers
in future school roll projections, the sustainability of the School did not support re-
opening of the School. Comments in relation to the closure of Minard Primary
School:
There are positives and negatives around a small school and a big school. Quality
of leadership is a factor and lack of staff is also an issue. 
You lose culture when you lose a small school. 
Many community members commented on the school premises and potential for
this to become a community asset: 
‘The building to be used for a purpose to benefit the community for example a
community hub with a shop and café.’ 
‘The community has lost the shop, post office and now school, we feel it is crucially
important that this building is retained to build the community.’

Page 88

88 
Community members discussed pursuing options for use of the building as a
community hub. 
9.2  Pupil Numbers
Table 5: Schools Occupancy: 
Minard
Primary
2022/2023 2023/24 2024/25
Approved
Capacity
33 33 33 
Projected
Roll 
6 4 2 
Occupancy
18% 12% 6% 
9.3  Financial Information
Transport costs taking pupils to alternative schools are £1,482. If Minard Primary
School were to be closed it would generate savings of £8,956 - the current annual
cost of mothballing (2021/22) to the Council. This includes electricity, heating oil,
ground maintenance, building maintenance and repair costs. 
If parents choose to send their children to Lochgilphead Joint Campus, there will be
no increase in costs regarding transport as there is capacity in the current system. 
9.4  Assessment of Rural Factors 
The reasons why the future of Minard Primary School is being reviewed are as
stated at Section 2 of this Report. There is no expectation for the pupil numbers at
Minard Primary School to increase. Minard Primary School is currently mothballed
and pupils are rezoned to other schools. To reopen the school would not increase
the pupil numbers, however some members of the community feel that a local
school would attract families to the area.   
9.4.1  Community Impact
The community had differing opinions on the closure of the school. Some
would like the school to reopen, some reluctantly accepted that numbers
were so low the school may not be viable in the long term. All agreed that
they would want a decision made and that it would be retained for community
use, and not be allowed to fall into a state of disrepair. Within Minard there is
a village hall. While it is accepted that school closure may have an adverse
effect on a community, a vibrant community hub could be an asset to a
community. This could potentially have a very positive impact on
sustainability of the community if this option were to progress. If the
Community wished to create a community hub, they would require to find a
mechanism to acquire the property from the Council and deliver that
aspiration. The buildings forming the school premises are situated within

Page 89

89 
walking distance of the village. If the local plans for the building progress, this
would have a positive impact on the sustainability of the village. Formal
closure of the school would mean that these plans could potentially be
progressed by the community. 
9.4.2  Travel Arrangements
The travel distance (sourced from Google maps) from Minard Primary to
Furnace Primary is 3.82 miles via the A83. Travel time is approximately
seven minutes by car. The travel arrangements have been in place for more
than three years. Travel is an accepted aspect of living in the Minard
community. However one family has expressed strongly that they are
finding the travel arrangements in place for Furnace very difficult.   
Transport costs for pupils to Furnace Primary are £1,482. 
Other families in the Minard area have chosen to place their children at
Lochgilphead Joint Campus due to their own work and family commitments
and have made their own travel arrangements. The travel distance (sourced
from Google maps) from Minard to Lochgilphead Joint campus is 13.13 miles
via A83. Travel time is approximately 19 minutes by car. This option would
have no effect on the current travel arrangements of staff. There would be no
additional travel costs for children attending Lochgilphead Joint Campus as
there is capacity in the current system. 
The closure of Minard Primary School, in terms of travel would have a neutral
effect on the environment.   
9.5  Educational Benefits 
The principles of Curriculum for Excellence recognise the professionalism of
teachers and the importance of this in exercising the freedom and responsibility
associated with broader guidance. This means that schools are able to design their
curriculum to meet the specific needs of their children and community. There are no
specific educational benefits as all schools implement Curriculum for Excellence
ensuring effective learning and teaching which is matched to the needs of children. 
It is proposed that children in the Minard catchment area would be directed to
Lochgilphead Joint Campus or Furnace Primary, depending on where they live in
the catchment area. The proposal is that children living in the north section of
catchment area from Achagoyle Bay to Blackstone Bay attend Furnace Primary
(with the section of Minard’s catchment area being subsumed by Furnace Primary
School) and children in the south section of the catchment area from Achagoyle Bay
to Kilmichael Beg attend Lochgilphead Joint Campus (with that section of Minard’s
catchment area being subsumed by Lochgilphead Primary School).

Page 90

90 
Both Minard and Furnace are very remote rural schools. Lochgilphead Joint
Campus is a remote rural school. Each school is set within a remote rural area
(Scottish Government classification).   
Furnace Primary
Children from Minard area from Achagoyle Bay to Blackstone Bay who would attend
Furnace Primary School are benefitting from the rural environment and the strengths
that a small village primary can offer. Good quality outdoor learning is currently
provided at Furnace Primary. 
In Furnace Primary School children are taught in classes composed of children from
more than one year group. Children benefit from being part of a strong social context
in which they can build relationships with different groups and individuals, develop
social skills, meet challenges and exercise responsibilities as members of a social
group. They are able to interact and socialise with groups of children of their own
gender, take part in team activities and move with their peers as an established
friendship group to secondary school at Lochgilphead Joint Campus. 
Lochgilphead Joint Campus
Children from the Minard catchment area from Achagoyle Bay to Kilmichael Beg
who would attend Lochgilphead Joint Campus would benefit from learning within a
bigger context and community. Children are taught in single year groups and there
is a wide range of expertise within a larger staff team. 
The school has strong community links and children learn in a variety of contexts
and groups including ability, co-operative and social. The school provides a number
of wider curricular activities and pupils transition within the campus from Pre-5 to
secondary education. 
9.6  Summary
People who attended the consultation had differing opinions in relation to the closing
of Minard Primary as a school, and realigning the catchment area of Minard Primary
School due to the remote nature of the school’s location. Some wanted the school
to open for their families and become the heart of the community once again; others
reluctantly accepted that such low numbers did not make the school viable in the
future. The majority commented on the potential for the school premises to be used
as a community asset. 
The travel distance (sourced from Google maps) from Minard Primary to Furnace
Primary is 3.82 miles via the A83. Travel time is approximately seven minutes by
car. The travel arrangements have been in place for over three years. Travel is an
accepted aspect of living in the Minard community. However one family has
expressed strongly that they are finding the travel arrangements in place for Furnace
very difficult. Other families in the Minard area have chosen to place their children

Page 91

91 
at Lochgilphead Joint Campus due to their own work and family commitments and
have made their own travel arrangements. The travel distance (sourced from
Google maps) from Minard to Lochgilphead Joint campus is 13.13 miles via A83.
Travel time is approximately 19 minutes by car. 
This option would have no effect on the current travel arrangements of staff. The
closure of Minard Primary School, in terms of travel would have a neutral effect on
the environment.  Transport costs for pupils are £1,482. Minard Primary School pupil
numbers are not projected to increase significantly. Furnace and Lochgilphead Joint
Campus have capacity to continue to accommodate the projected pupil numbers. 
In Furnace Primary and Lochgilphead Joint Campus children benefit from a positive
learning environments with learning and teaching which is matched to the needs of
the young people who attend each school. In addition, there are opportunities for
personal and social development in these settings. 
Taking all of the above into account, and considering how this option is likely to
successfully address the underlying reasons why the future of Minard Primary
School is being considered, this has been identified as a reasonable option for
further consideration.       
10.  OVERVIEW OF OPTIONS
Option Option Description Outcome
A Re-open Minard Primary School with the
existing catchment area
Not a reasonable option.
B Continued Mothballing of Minard
Primary School with the pupils zoned to
Furnace  Primary School.
Not a reasonable option.
C Close Minard Primary School and
realign the catchment area of Furnace
Primary School and  Lochgilphead Joint
Campus to include the current
catchment area for Minard Primary
School. 
A reasonable option. 
11.  DETAILED ANALYSIS OF REASONABLE OPTION: CLOSE MINARD PRIMARY
SCHOOL AND REALIGN THE CATCHMENT AREA FOR FURNACE PRIMARY
SCHOOL AND LOCHGILPHEAD JOINT CAMPUS TO INCLUDE THE CURRENT
MINARD CATCHMENT AREA

Page 92

92 
11.1 Pupil Projections 
Minard
Primary
2022/2023 2023/24 2024/25
Approved
Capacity
33 33 33 
Projected
Roll 
6 4 2 
Occupancy
18% 12% 6% 
11.2  Educational Benefits
This statement focusses on Furnace and Lochgilphead Primary Schools, which are
the schools the proposal is focused on in terms of realigning the catchment area for
Minard. Some pupils in the Minard area have been attending Furnace Primary since
it was mothballed. Some pupils within the catchment area for Minard have always
attended Lochgilphead Primary School as placing requests, these pupils have never
attended Minard, even when it was open as the placement suited family work
commitments. 
11.2.1  Learning and Teaching at Furnace Primary
The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. 
In Furnace Primary School, children are encouraged to be eager and
active participants who are engaged, resilient and motivated during
their learning. Children know that their views are sought, valued and
acted upon. The learning environment encourages high level of
achievement, providing a wide range of opportunities for children to
achieve their full potential within the four contexts of learning. 
In Furnace Primary School, children may be taught in classes
composed of children from more than one year group. Children benefit
from being part of a social context in which they can build relationships
with different groups and individuals, develop social skills, meet
challenges and exercise responsibilities as members of a social
group. 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement

Page 93

93 
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising
the freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. At Furnace Primary
School, staff are challenged and supported through a range of
continuous professional development and review opportunities gained
by working and learning with a range of colleagues. These schools are
also part of the Mid Argyll Schools Cluster, supported together,
moderation and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within these schools are
able to support and challenge each other on a daily basis. The whole
staff teams are able to bring a range of talents and skills to benefit
outcomes for learners. 
From August 2022, Furnace Primary will be part of a shared headship
with Inveraray Primary and it is anticipated that staff and children will
benefit from working with other professionals and children from
another context. 
Furnace Primary School encourages nurturing and positivity. One
aspect of this work is a successful Buddy System. Children from
different stages work and learn together. This vertical support is
particularly evident in a number of different planned activities when
groups of children are together in a social context. This system
develops and benefits both the ‘buddy’ and the ‘buddied’. To
implement this system there needs to be children across a range of
stages in the school. 
Furnace Primary School is a very remote rural school (Scottish
Government classification). Children from the Minard area attending
Furnace Primary would be benefitting from the rural environment and
the strengths that a small village primary can offer. Good quality
outdoor learning is currently provided at Furnace Primary.   
11.2.2  Outcomes
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to
ensure each child has the opportunity to reach their potential.  Careful
tracking and monitoring procedures are in place to evidence pupil
progress. This includes professional dialogue with teachers, learning

Page 94

94 
discussions with children, classroom observations, assessment and
looking at pupil work. Planning for Progress meetings are being further
strengthened. These discussions between home and school improve
parental engagement whilst focussing on next steps for learning.
Where appropriate, intervention is put in place, while working
effectively with other agencies and parents to ensure the needs of
each child are met. 
In the primary classes, standards of attainment have been maintained
over the last three years. Most children are achieving national
expectations in reading, writing, listening, talking and numeracy. All of
the schools in Mid Argyll continue to develop within the PATHS
program supporting positive behaviours and relationship within the
school.  A larger staff, parent body and partner group by nature
increases the breadth of talent and interest that may be available to
share within a school setting. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced
by staff individual expertise e.g. PE, language, science, expressive
arts teaching. 
11.2.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities
and attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future.   
11.2.4  Environment for Learning
Furnace Primary is a suitably-equipped and well supported school,
situated in the heart of the community. The building is well maintained
and provide a fit for purpose accommodation for primary aged
children.  The school has access to outdoor areas that support pupil
learning and wellbeing.  The building has facilities for pupils and
visitors with special access needs. 
11.3  Assessment of Rural Factors – Furnace Primary
The reasons why the future of Minard Primary School is being reviewed are stated
at Section 2 of this report. There is currently no expectation for the pupil numbers to
increase at the School. Minard Primary School is mothballed with no current pupils.
Having considered all the alternatives above, the option to close Minard Primary
School and realign the catchment area for Furnace Primary School and
Lochgilphead Primary School respectively to include the former Minard Primary
School catchment area is considered the most reasonable means to address the
reasons identified at Section 2 of this report.

Page 95

95 
11.3.1  Community Impact
The community offered differing views on the proposed closure of the
school. There was a suggestion that should the school close, the
building and adjoining grounds could potentially be retained for
community use. There was a view from some community members
that a local school would attract new families to the area. Within
Minard there is a Village Hall which houses community events. All
people who attended the Options Appraisal Meeting strongly stated
the school building should be retained for community use and not
allowed to fall in to further disrepair, as that would adversely impact
on the community’s access to the premises and the visual impact of
the village. It is accepted that a school closure may have an adverse
effect on a community, but a vibrant community hub could be an asset
to the community. The school premises are situated within walking
distance of the village. Formal closure of the school would mean that
plans for the future of the building could potentially be progressed by
the community. 
11.3.2  Travel Arrangements
The travel distance (sourced from Google maps) from Minard Primary
to Furnace Primary is 3.82 miles via the A83. Travel time is
approximately seven minutes by car. The travel arrangements have
been in place for more than three years. This option will have no
impact on staff travel. Travel is an accepted aspect of living in the
Minard community. However one family has expressed strongly that
they are finding the travel arrangements in place for Furnace very
difficult.  Transport costs for pupils to Furnace Primary are £1,482. 
The closure of Minard Primary School, in terms of travel would have a
neutral effect on the environment.   
11.4    Learning and Teaching at Lochgilphead Joint Campus
The curriculum includes a broad range of experiences which are
planned for children and young people through their education, to help
every child and young person to develop knowledge, skills and
attributes for success in learning, life and work. 
In Lochgilphead Joint Campus, children are encouraged to be eager
and active participants who are engaged, resilient and motivated
during their learning. Children know that their views are sought, valued
and acted upon. The learning environment encourages high level of
achievement, providing a wide range of opportunities for children to
achieve their full potential within the four contexts of learning.

Page 96

96 
Children are taught in single year groups and there is a wide range of
expertise within a larger staff team. The school has strong community
links and children learn in a variety of contexts and groups including
ability, co-operative and social. The school provides a number of wider
curricular activities and pupils transition within the campus from Pre-5
to secondary education. 
There is a continual challenge for all schools to deliver a school
improvement agenda and deliver effectively the principles and
outcomes of curriculum for excellence. The National Improvement
Framework priorities include raising attainment for all, and closing the
gap between the most and least disadvantaged children.   
The principles of Curriculum for Excellence recognise the
professionalism of teachers and the importance of this in exercising
the freedom and responsibility associated with broader guidance. This
means that schools are able to design their curriculum to meet the
specific needs of their children and community. At Lochgilphead Joint
Campus, staff are challenged and supported through a range of
continuous professional development and review opportunities gained
by working and learning with a range of colleagues. These schools are
also part of the Mid Argyll Schools Cluster, supported together,
moderation and tracking of pupil progress is enabled and staff work
across stage appropriate groups. Colleagues within these schools are
able to support and challenge each other on a daily basis. The whole
staff teams are able to bring a range of talents and skills to benefit
outcomes for learners. 
Lochgilphead is a remote rural school (Scottish Government
classification). Lochgilphead Joint Campus has a welcoming and
inclusive ethos of celebrating pupil achievement and prides itself in
being big enough to offer a breadth of experience for pupils but small
enough to strive to meet the needs of all pupils. 
The co-location of the nursery and the primary classes at
Lochgilphead Joint Campus enhance the transition process for
children moving from Nursery in to Primary one, through joint
educational processes and liaison between the two settings. 
11.4.2  Outcomes
Through the GIRFEC practice model, meeting the needs of every child
continues to be a priority and teachers carefully plan and assess to
ensure each child has the opportunity to reach their potential.  Careful
tracking and monitoring procedures are in place to evidence pupil

Page 97

97 
progress. This includes professional dialogue with teachers, learning
discussions with children, classroom observations, assessment and
looking at pupil work. Planning for Progress meetings are being further
strengthened. These discussions between home and school improve
parental engagement whilst focussing on next steps for learning.
Where appropriate, intervention is put in place, while working
effectively with other agencies and parents to ensure the needs of
each child are met. 
In the primary classes, standards of attainment have been maintained
over the last three years. Most children are achieving national
expectations in reading, writing, listening, talking and numeracy. All of
the schools in Mid Argyll continue to develop within the PATHS
program supporting positive behaviours and relationship within the
school.  A larger staff, parent body and partner group by nature
increases the breadth of talent and interest that may be available to
share within a school setting. This applies both in terms of the wider
curriculum and within aspects of the curriculum that may be enhanced
by staff individual expertise e.g. PE, language, science, expressive
arts teaching. 
11.4.3  Experiences - Broadening the Range of Opportunities 
Children are offered a range of active, planned experiences which help
them develop the knowledge and understanding, skills, capabilities
and attributes which they need for their mental, emotional, social and
physical wellbeing both now and in the future.   
11.4.4  Environment for Learning
Lochgilphead Joint Campus is a suitably-equipped and well supported
school, situated in the heart of the community. The building is well
maintained and provide a fit for purpose accommodation for primary
aged children.  The school has access to outdoor areas that support
pupil learning and wellbeing.  The building has facilities for pupils and
visitors with special access needs. 
11.5  Assessment of Rural Factors – Lochgilphead 
The reasons why the future of Minard Primary School is being reviewed are stated
at Section 2 of this report. There is currently no expectation for the pupil numbers to
increase at the School. Minard Primary School is mothballed with no current pupils.
Having considered all the alternatives above, the option to close Minard Primary
School and realign the catchment area for Lochgilphead to include a portion of the
current Minard Primary School catchment area is considered the most reasonable
means to address the reasons identified at Section 2 of this report.

Page 98

98 
11.5.1  Community Impact
The community offered differing views on the proposed closure of the
school. There was a suggestion that should the school close, the
building and adjoining grounds could potentially be retained for
community use. There was a view from some community members
that a local school would attract new families to the area. Within
Minard there is a Village Hall which houses community events. All
people who attended the Options Appraisal Meeting strongly stated
the school building should be retained for community use and not
allowed to fall in to further disrepair, as that would adversely impact
on the community’s access to the premises and the visual impact of
the village. It is accepted that a school closure may have an adverse
effect on a community, but a vibrant community hub could be an asset
to the community. The school premises are situated within walking
distance of the village. Formal closure of the school would mean that
plans for the future of the building could potentially be progressed by
the community. 
11.5.2  Travel Arrangements
Some families in the Minard area have chosen to place their children
at Lochgilphead Joint Campus due to their own work and family
commitments and have made their own travel arrangements, before
Minard Primary was mothballed. The travel distance (sourced from
Google maps) from Minard to Lochgilphead Joint campus is 13.13
miles via A83. Travel time is approximately 19 minutes by car. This
option would have no effect on the current travel arrangements of staff.
There would be no additional travel costs for children attending
Lochgilphead Joint Campus as there is capacity in the system. 
The closure of Minard Primary School, in terms of travel would have a
neutral effect on the environment.   
11.6  Financial Impact
The main elements included within a school budget are Teacher employment costs
(i.e. basic salary costs plus related employer’s National Insurance and
Superannuation contributions plus any relevant individual allowances); Local
Government employee costs and an allocation for discretionary expenditure
incurred by the school (i.e. educational equipment, materials, staff travel, etc.). 
Teacher staffing budgets are calculated on an annual basis and within the Primary
sector are determined, taking cognisance of the SNCT class size maxima, by the
number of classes required to provide for the specific number and age of the pupils
in each school.  When a school ceases to be operational the Teacher staffing budget
is adjusted (at the appropriate time), per entitlement information from Education HR,

Page 99

99 
with the staffing budget resulting in a nil value.  As a result of the authority’s policy
for no Teacher redundancies it is presumed that the staff are deployed elsewhere
within the authority and therefore their salary costs still exist with an increase to the
receiving school’s budget.  This is also in line with the national priority of maintaining
teacher numbers.  This methodology also applies to the school’s discretionary
budget which again is formula based.  The budget of the receiving school, in terms
of any pupils being transferred, will have increased.  The figures outlined below take
account of the fact that the staffing and discretionary budgets have been adjusted
to nil. 
The annual running costs during mothballing of Minard Primary School are a total of
£8,956. 
Annual savings generated through closing Minard Primary School would be £8,956.
The costs/savings outlined above assumes all revenue expenditure would cease.
This includes non-domestic rates, utility costs, insurances, etc.  If the school was to
be formally closed, this would allow the council to take steps towards selling the
school to a third party or local community. 
11.5  Environmental Impact
Currently pupils travel to Furnace Primary and Lochgilphead Joint Campus.
However this option would have a neutral environmental impact on the current
position and would have no impact on the current travel arrangements for staff and
pupils. Families travelling to Lochgilphead Joint Campus do so for work and family
commitments, and would continue to do so, even if Furnace Primary were to re-
open. Travel is an accepted aspect of rural life. 
12.  CONCLUSION
Three alternative options have been reviewed in considering the future of Minard
Primary School.  For each option, information was collated and consideration was
given to:
• Community feedback;
• Pupil numbers; 
• Financial Information;
• Assessment of rural factors, including community impact, economic impact and
travel arrangements, and
• Educational Benefits.
An authority that is contemplating a rural school closure proposal must satisfy the
preliminary requirements set out in Section 12A of the 2010 Act before formulating a
proposal.

Page 100

100 
After consideration of the preliminary requirements, as set out in the Act, and the
options, and having regard to the specific reasons identified at Section 2 of this
report, closing Minard Primary School and realigning the catchment area to Furnace
Primary School and Lochgilphead Joint Campus is the most reasonable option for
consideration. 
It is recommended that the Community Services Committee:
a. Note the outcome of this consideration of the preliminary requirements;
and,
b. Agree that officers now formulate a draft proposal that will come back to the
June 2023 meeting of the Committee for approval by members which would
subsequently trigger the formal consultation process under the Schools
(Consultation) (Scotland) Act 2010. 
Appendix 1 Local Development Plan for Minard 
H30
1980
1980
1990
1990
6
9
6
6
9
6
6
9
7
6
9
7
6
9
8
6
9
8
© Crown copyright and database rights 2019.  Ordnance Survey Licence number  0 1 2 3 4 5 metr
1:12,5Scale at A4         
Argyll and Bute Proposed Local Development Plan 2
Map Number 117 
Minard and Crarae Point

Page 101

101 
Appendix 2 Local Development Plan for Furnace 
M3
002
201
000
201
000
202
000
202
000
203
000
203
000
© Crown copyright and database
rights 2019.  Ordnance Survey Licence number
100023368 0 1
0
2
0
3
0
4
0 met
res 1:10,
000
Scale at
A4 - 
Argyll and Bute Proposed Local
Development Plan 2  
Furnace and Sandhole

Page 102

102 
P30
08
P30
16
P30
09
H30
06
H30
02 H30
05
H30
30
H30
14
A30
15
186
000
186
000
187
000
187
000
© Crown copyright and database
rights 2019.  Ordnance Survey Licence number
100023368 0 1
0
2
0
3
0
4
0met
res 1:10,
000
Scale at
A4 - 
Argyll and Bute Proposed LDP2 
Lochgilphead North 
Appendix 3 Local Development Plans for Lochgilphead

Page 103

103

Page 104

104 
Appendix 4 Key for Local Development Plans

Page 105

105 
Appendix 5 Minard Primary Floor Plan

Page 106

106 
Appendix 6 Lochgilphead Joint Campus Floor Plan

Page 107

107

Page 108

108 
Appendix 7 Furnace Floor Plan

Page 109

109 
Appendix 8 Notes from Community Consultation Day 
Minard Community Consultation     26TH May 2022
19 people attended through the day
Some have also responded by email. 
General responses 
Wrap around care featured….
I feel there are limited efforts to keep Minard PS open. Argyll and Bute have not committed
to the wrap around care that would make it viable. There used to be after school care in
Furnace that was also used by Minard families. When it closed, it also had an impact on
Minard.
The council have made a conscious choice not to support wrap around care to help to
close schools.
When the school was open, we had an after school club. Would parents take ownership
of this? Help with before and after school care? It might suit parents better who are now
working from home. 
Wrap around care is important for a school in this location and context. 
The school was at the heart of the community
It’s more than just a school.
This was a vibrant school at the heart of the community. When my children came here –
there were 30 children here. Those children have gone on to be very successful. They
also have a community minded approach to life. Children gain so much from the
community that is valuable. How can that be provided by a bigger community? When the
children were here, they would feel the support from the other members of the community.
This was the hub for the community.
There was a great feeling around the school. 
As a former parent, we would never have moved here without the school being open. The
shop, the post office, church – the school is so important – without a school the village is
dead. This was a marvellous school, the village was buzzing. The school was the life of
the village/community – it was vibrant – with Easter celebrations, Christmas and the local
community would offer support.
I have been part of the community for 40 years and my children attended the school and
hold very responsible positions with the Scottish Government and Strathclyde University.
I was involved in the school, I find it so sad as it was the centre of the community. 
There was such a pride in the school – with different activities, including coffee mornings
– the whole community supported the children in many ways. 
When you have an education in a school like this, it stays with you. 
General comments 
I can’t say either way without more information.
This affects the long term future of communities that are between Inveraray and
Lochgilphead. 
If you are transported to another town to go to school, you lose your connection with your
home community.

Page 110

110 
ABC needs to take care because of how previous proposed closures were managed. This
needs compassion. 
Children end up not having freedom to play with friends without being transported. For
children from low income families, this impacts more. The cost of living is real.
Having the school closed has impacted on the connections or lack of that young families
have. Covid activities in the community illustrated this as activities for kids was organised
by older families. 
The community used to be based around so much many of the school activities.
The use of the building and grounds would need to be for the community, should the
school close.
Concern that if the school were to close, it would end up as an Airbnb or anti-social
neighbours.
The actions of the council are out of line with what they are saying about retaining schools
therefore there is a lack of trust. 
We need to look at all the facts and we don’t have these. Maybe we need an independent
mediator to help facilitate discussion.
x2 Would encourage a decision to be made about the future of the building and grounds
sooner rather than later. 
Social belonging is important but is it to be expected from education? 
This is a reflection of how life is now in a rural area – you need to commute out of the
village for work and services. 
I don’t feel I have enough information around the health and wellbeing impact on pupils. 
Empty houses for holiday lets – the community could be gone and this is a ghost town. 
This affects the local church too.
Within the locality, it is holiday homes around here. Are there 10 affordable houses meant
to be built? 
I am torn between the personal and the professional outlook – if my wee one was to come
here – socially - what would I want?
What we need are more children within the area.
Families who have already settled will stay in other schools as they will be established.
We would need more children to have enough in a co-hort. 
We need the community to thrive and numbers to go up for the school to be viable. The
social side – could the school provide this? 
All it takes is for some local families to move into the area. 
The Community Council held a meeting regarding the school previously – 4 adults turned
up.
Amenities have reduced considerably in the village – what is there for young families?
Recently young families have stepped up and kept it alive but sadly the writing is on the
wall.
House prices in the area are so high – ACA? Indeed, across Argyll.
Housing is an issue in the area. 
This could become a ‘ghost village’, with second houses. 
Such a shame about the building – not easy. 
Understand what families are doing at the moment - it is convenient for them to have their
children attend other schools.

Page 111

111 
It would be perfect to open the school again but realistically we know it is hard – but there
is a danger this will become a retirement village. 
The recent Transformation plans from the education department – gives me concerns for
the future. 
We need to make the area attractive for families in the future. 
Affordable housing in the area is an issue. What is affordable for families? Employment
is also an issue. 
We know staffing is an issue – but can we look at accommodation for members of staff to
attract them to the area? 
When travelling to another school, the LA should provide a school bus, rather than a public
bus. 
There are young families in the village – children are the lifeblood, we have children and
grandchildren locally. 
I understand parents wanting to go elsewhere to education their children – is it linked with
after school care? 
There are retired people here and the age demographic is older. 
The local economy 
Not having a school impacts on the local economy.
No school resulted in no shop.
When we lost the shop, it was hard. 
Toddler group
There is a toddler group starting to encourage family participation in the area. This is split
between Furnace and Minard. 
There is a Parent and Toddler group (13 max) attending, with 6-8 regular attenders – we
work between Minard and Furnace and the parents like this. 
There have been incidents with the alarm going off.
The building itself
The Community Trust was a tenant in the front room of the school house. It is still a tenant
but ‘stuff’ moved out. CT on space at front. 
Would like to see it used for a purpose for young people regardless. The building needs
investment. 
What affect has the mothballing had on you, your family, the community? 
Mothballing the school has had a huge impact on community cohesion.
Families have been forced into going elsewhere and now they don’t know what they are
missing. 
No focal point left for the village.
I feel really sad about it – my kids did really well out of the school. 
Mothballing has forced community conversations around how the school could be better
used. 
I think it should continue to be mothballed as we don’t know what people’s lifestyles are
going to be in the next 5 years, into the post-pandemic world.
The school connected (and was at the centre of) the community. It gave us a focus.
It’s not being an asset to the community at the moment. 
Need to accept that families are now looking to seek wider friendships for their family. 
This was a vibrant school that was part of our community.

Page 112

112 
The school delivered a high quality education.
The children gained great democratic community skills. 
Views on continuing with the mothballing 
How will continuing to mothball the school increase numbers? 
Should we continue to mothball to see how post-pandemic living impacts on choices open
to parents? The increase in home working could make the local school more viable?
Could the school be used by the community in a more productive way whilst mothballed? 
Views on re-opening the school with existing catchment
There needs to be sufficient numbers of children in the school so that a child is not there
on their own.
Children in small schools learn so well from each other. 
It would be interesting to know post pandemic the projected numbers for pupils.
It would be great to involve the community through events that used to be led from the
school. 
The environmental impact and cost of living should be considered. 
There are very young children in the area, coming up. 
Unless you know there is potential to send a child to a local school, you are not going to
use it.
There are not any children to make it viable at the moment. 
I know that in order for it to be viable we need more children. I would like the school to
open with larger catchment area but there needs to be a demand. It is hard for families to
juggle – wrap around care could be an issue. 
Why has this happened? I find this very upsetting to look at the school like this – I know
there are not a lot of children in the village but could the school be used for adult purposes
too? 
Children would benefit from walking locally to school rather than going in the car. 
We have more young children already in our area that have recently arrived who could
benefit from local education in the village. 
If folk know if there is a school in the village area – it may attract more people here – there
were only ever good reports about the school and former pupils should be able to access
the school. The village needs new life rather than the older demographic – we need to
attract new younger members of the community. 
The school offers a fantastic context for learning about nature – children need to be
learning outdoors – it’s not just about learning in the classroom. 
The facilities and resources are already here to open – this could save money. 
Views on closing the school
You lose culture when you lose a small school.
Concern that this will have further impact on the local community and the economy.
It is difficult to motivate pupils in small groups. 
Not enough children in the locality for the school to be opened as an educational
establishment.

Page 113

113 
The school logbook show how much quality work was done in the school – but numbers
need to be healthy – numbers below 9 means it is hard to motivate children.
We have no need for a school. 
There are positives and negatives around a small school and a big school. Quality of
leadership is a factor and lack of staff is also an issue. 
Re-open the school but widen the catchment area
It would be competing with Furnace PS.
X2 You would need wrap around care. 
The toddler group has shown that there may be a demand for the school through this
group.
When the school was here, there was placing requests from outwith the area. 
There doesn’t appear to be the same commitment/flexibility within communities to support
one another with wrap around care. 
Parents need to want to support their own local schools. 
It’s harder to get a community feel in a large school. 
We are a young family and we work from home – it would be so convenient for us to have
the school open. 
We have a two year old and this is a strong community – there is no park/social space for
children to meet/socialise (other than the school) – the school would be a great hub for
them. I like the idea of small classes compared to larger classes – get more 1 to 1 focus
on pupils. The ‘friend base in one place ie the school helps in the transition to High School. 
As a young parent, I am unsure about transporting young children to another school. Our
travel and work commitments are an issue if the school does not re-open.
Social and belonging skills can be fostered. 
With my experience in Pupil Support, I would reflect that a small school can offer a great
deal for pupils with ASN. The distance between Lochgilphead and Inveraray us
considerable for young children. Pupils thrive in small schools – there are some children
who can’t cope in bigger schools. With the nurture agenda – it’s what small schools
provide. Some pupils have transferred to here – they could not cope elsewhere and they
flourished. My heart says open the school and widen the catchment area, but my head
knows it is unsustainable. The school grounds are fantastic for learning. 
This is a fantastic resource. 
Children need to come first – this should be used as education as its sole purpose. Need
to bring in as a village young children and families, without them we will lose buses, shops,
businesses. 
Mum’s need to be at the gate – it is about supporting them as much as supporting the
children. 
I feel this is such a waste of a beautiful building. Why keep Furnace open and close here?
Why not open here and close Furnace if their numbers are going down? 
To open the school would bring more life to the village and encourage young families into
the area. 
Future use of the building/grounds

Page 114

114 
X5  Could it be used as an outdoorcentre, Leisure/hostel/cycling/sailing/kayaks/archery
etc locals and visitors could access?
X 3 Could this be a Pre-5 centre? Nursery? 
Could this be used for Forest schools?
Could this be a 1 to 1 support place for children with learning disabilities? 
Could the school be used as a creative space/possible art hub?
Or a drop in medical centre – appointments for those who have mobility or transport
issues?
A health retreat? 
Fetes could be held.
Could be used as a bookable office or meeting space? 
Could the school house be let out to help finance the use of the school for the above
mentioned? 
Post COVID – would this be used differently as a building?
The building needs life but perhaps in a different purpose?
A hub to support those with addiction problems? 
Would parents re-consider school placements if this was on their doorstep/in their
immediate community? 
Uncertainty around the building and the grounds. Would the building and ground revert
back to the community? 
Issues with access. Concern over scale or any development. Does infrastructure support
this? Parking, etc? 
Could development create a population with more children without a school to deliver the
education service? 
Could the grounds be used for a community garden? 
Could the school be a community hub for adult education or educational purposes? The
last two years have been tough – it has had a lot of impact on the mental health of
everyone. 
The community would benefit from it being used on a commercial basis.
Use as a hub/café/current community use? 
X2 Needs to be used to its full potential/strengths
Community would benefit from use as a business or linked to education. 
So sad to see this – the building needs investing in. 
The school would make an amazing conversion into a home.
I believe there could possibly be 19 children attending the school in the future. This would
support a network for young families.
What happens for families living locally who do not have a car? 
The longer the building is left, it is going to be open to vandalism and squatters. The
building has a heritage that we cannot lose. 
What is it going to turn into? The Lloyd family had gifted to Argyll and Bute.
Would like the community to pull together to consider buying the building. 
Questions raised 
What are the financial implications? 
What infrastructure is being put in place to support/encourage young families into the
area?

Page 115

115 
What is the overall plan for the future proofing of the area to join up housing etc? 
Is it the responsibility for education to provide that sense of belonging? 
Is there an argument for the school to be used while mothballed? 
What are the plans for the building? 
Information provided
Local residents also provided Education representatives with information about the
ownership of the building and also thoughts on the accuracy of numbers of children in the
area.

Page 116

Appendix 2  - EQSEIA 
Argyll and Bute Council     
Argyll and Bute Council:
Equality and Socio-Economic Impact Assessment 
Section 1: About the proposal 
Title of Proposal 
To close Minard Primary School.  
Intended outcome of proposal 
The proposal is to close Minard Primary School. 
Currently, we are in the consultation phase, at this stage it is vitally important that we
seek the views of all stakeholders affected by this proposal.  Once this has been done,
there will be a consultation report prepared on the issue by Local Authority Officers,
with input from Education Scotland.  This report will be presented to the Community
Services Committee (CSC) for their decision. 
Ultimately, the intended outcome the closure of the school, which has been
mothballed for over four years.  If after consultation the stakeholders involved in the
process, Education Scotland, and the CSC feel that the closure is not a reasonable
option, then the closure would not take place.   
Description of proposal 
Consideration of this proposal means that a decision is being taken about
permanently closing Minard Primary School.   
As per the legislative guidance set out in the Schools (Consultation) (Scotland) Act
2010, Argyll and Bute Council is seeking views on the following proposal, namely: 
It is proposed that education provision at Minard Primary School be discontinued with
effect from 31st May 2024. 
The catchment area of Furnace Primary School shall be extended to include the
current catchment area of Minard School. 
Reasons for this Proposal 
This is the best option to address the reasons for the proposals which are;

Page 117

117 
• Minard Primary School has been mothballed for over four years. The school
roll is low and not predicted to rise significantly in the near future. The annual
cost of the mothballing of the building is £10,382. 
• Along with several other rural Councils, Argyll and Bute is facing increasing
challenges in recruiting staff. The local and national staffing challenge has not
improved. In June 2023 there were 8.59fte primary vacancies in Argyll & Bute. 
• Whilst Minard Primary School is a sound building, it will deteriorate with limited
budgets for maintenance. 
On 8th June 2023   Argyll and Bute Council’s Community Services Committee agreed
that a consultation with all stakeholders be undertaken on the proposal.   
Corporate Priorities to which the proposal contributes: 
Learning estate now and in the future; we will ensure our schools are effective,
sustainable learning environments.
Attaining and achieving at all stages; we will improve outcomes for children and young
people. 
Lead officer details:   
Name of lead officer – Annette Trevelyan 
Job title – Education Officer
Department - Customer Services: Education 
Appropriate officer details:   
Name of appropriate officer - Wendy Brownlie
Job title - Head of Education 
Department - Customer Services: Education
Sign off of EQSEIA 
Date of sign off 
13th February 2024 
Who will deliver the proposal? 
Should the closure go ahead, there will be in fact no change to the current arrangements
which have been in place since the school has been mothballed.

Page 118

118 
The Head Teacher of Inveraray Primary School, in her capacity as shared Headship with
Furnace Primary School, will be the senior officer of the Council who provides the leadership
of the educational experience for the children attending the school, who would have otherwise
attended Minard Primary School. The Education Central team of the Council will be
responsible for the support and challenge of the school as per standard protocols.    
Transport colleagues will be responsible for any travel arrangements for children who are
entitled to this, and this has already been in place since the school was mothballed. 
Section 2: Evidence used in the course of carrying out EqSEIA 
Consultation / engagement 
Under the Schools (Consultation) (Scotland) Act 2010, if a local authority proposes to close a
school it must undertake a statutory consultation with the ‘relevant consultees’ affected by
this proposal. In this instance; 
Lochgilphead and Furnace Primary Schools  
are the ‘affected schools’. 
The formal consultation on the proposal within this document will be undertaken under
the terms of the Schools (Consultation) (Scotland) Act 2010 (“the Act”). The
consultation period will start on 15th June 2023 (with due written notice of the proposal
issued to the relevant consultees listed in Appendix 1) and end on 13th September
2023.  Written representations must be received by this date in order to be taken into
account. 
A copy of the proposal document will be provided to the following ‘relevant
consultees’ in terms of the Act: 
A summary of that document will be provided to: 
• The Parent Councils of the affected schools 
• The parents of the pupils at the affected schools 
• Parents of children expected to attend an affected school within 2 years of the
date of publication of this Proposal Document 
• The pupils, deemed to be of suitable age and maturity to be able to
communicate a view on the proposal, at the affected schools 
• The teaching and ancillary staff at the affected schools 
• The trade unions representatives of the above staff 
• Argyll and Bute Councillors (Ward 3 Mid Argyll)
• Furnace Community Council  
• West Loch Fyne Community Council  
• Lochgilphead Community Council
• Relevant users of the affected schools 
• The Constituency MSP 
• List MSPs for the area 
• The Constituency MP

Page 119

119 
• Chief Superintendent, Police Scotland 
• Chief Executive, NHS Highland 
• Chief Executive Strathclyde Partnership for Transport (SPT) 
• Area Commander, Fire Scotland 
• Education Scotland 
A copy of that document is also available from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochgilphead Library, Manse Brae, Lochgilphead, PA31 8XQ 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD 
• Lochgilphead Joint Campus, Kilmory, Lochgilphead, PA31 8AA 
• Furnace Primary Furnace, By Inveraray, Argyll PA32 8XU

Page 120

120 
The steps listed below have also been taken to ensure that the proposal is widely available:  
• The proposal document will also be published on the Argyll and Bute Council website;
• Publicised in Argyll & Bute’s weekly Newsround throughout the consultation period;
• Social media postings by the council on both the Proposal and public meeting;
• Physical posters re the public meeting displayed at the affected schools
(Lochgilphead, Furnace & Inveraray) and local shops in Inveraray
• This document can be made available in alternative forms or translated by contacting
Argyll House, Dunoon, tel: 01369 708576 or argyllhousereception@argyll-bute.gov.uk;    
A copy of this document will also be available from: 
• Council Headquarters, Kilmory, Lochgilphead, Argyll, PA31 8RT 
• Education Offices, Argyll House, Dunoon, Argyll, PA23 8AJ 
• Lochgilphead Library, Manse Brae, Lochgilphead, PA31 8XQ 
• Lochgilphead Service Point, 1A Manse Brae, Lochgilphead, PA31 8RD 
• Lochgilphead Joint Campus, Kilmory, Lochgilphead, PA31 8AA 
• Furnace Primary Furnace, By Inveraray, Argyll PA32 8XU 
There will be a public meeting held on the 29th August 2023 at 7.00pm in Minard Primary
School.

Page 121

121 
DATA 
The catchment area for Minard Primary School is classed as remote rural. The
definition for remote rural are settlements with a population of less than 3,000 with a
greater than 30 minute drive time to the nearest settlement with a population of 10,000
or more. 
Source: Rural Scotland Key Facts 2021 The Scottish Government , February 2021 
https://www.gov.scot/publications/rural-scotland-key-facts-2021 
Remote rural areas have a lower percentage of the population in the 0-15 and the 16-
44 age groups but a higher proportion of people aged 45-64. For example, in 2019
27% of the population in remote rural areas and 30% of the population in accessible
rural areas were 16-44 year olds, compared to 38% in the rest of Scotland. 
Conversely, 58% of the population in remote rural areas and 52% of the population in
accessible rural areas were aged 45 and over, compared to 45% in the rest of
Scotland. 
In 2019 the proportion of people aged 65 or over was 21% in accessible rural areas
was and 26% in remote rural areas compared to 18% in the rest of Scotland. 
56% of journeys to school were made by walking or cycling in 2021.  68% of those
aged 4-11 and 43% of those aged 12-18 usually walked or cycled to school.  For those
aged 4-11 the next most popular mode was as a passenger in a car or van (25%).  For
those aged 12-18, the next most popular was school bus (28%).  5% of children aged
4-11 usually used school transport. 11% of children living in the most deprived SIMD
areas (centile 1 and 2) used school transport. 50% of children living in remote rural
areas used school transport.
Transport and Travel in Scotland 2021: Results from the Scottish Household Survey |
Transport Scotland  (updated September 2022)

Page 122

122 
OTHER INFORMATION       
Evidence for this proposal was found in the Equality Evidence Finder, and in the Guidance for
the Fairer Scotland Act.    
Additional evidence was found in the School (Consultation) (Scotland) Act 2010, in terms of
legislative compliance. Education management circulars, 1.33 on capacity, 3.01 on admission
and 3.09 on transfers were also consulted. The circular 3.23 on child protection and
safeguarding was also considered.    
The national policy of GIRFEC – Getting it Right for Every Child, was also considered in the
formation of this proposal as was the Argyll and Bute Education vision and strategy, Our
Children, Their Future 
Gaps in evidence 
There are no gaps in evidence 
Section 3: Impact of proposal 
Impact on service users: 
Description Negative  No
impact 
Positive    Don’t
know 
Protected characteristics:         
Age    X     
Disability    X     
Ethnicity    X     
Sex    X     
Gender reassignment    X     
Marriage and Civil Partnership    X     
Pregnancy and Maternity    X     
Religion    X     
Sexual Orientation    X     
Fairer Scotland Duty:         
Mainland rural population        x 
Island populations    x     
Low income         X 
Low wealth        X 
Material deprivation        X 
Area deprivation        X 
Socio-economic background        X 
Communities of place        X 
Communities of interest        X 
If you have identified any impacts on service users, explain what these will be.

Page 123

123 
If any ‘don’t knows have been identified, at what point will impacts on these groups
become identifiable? 
If the proposal is accepted, there will be no immediate impact on pupils and families, as the
children are already currently attending Lochgilphead and Furnace/ Inveraray Primary
Schools, who would otherwise have attended Minard Primary School.    
There may be families who move into the revised catchment area who would then require
transport, and in addition, if significant, this may lead to changes in staffing levels in Furnace
Primary School.    
The Education Management team will use their existing quality assurance procedures to
monitor the education provided in the school. 
Impact on service deliverers (including employees, volunteers etc.): 
Negative  No
impact 
Positive    Don’t
know 
Protected characteristics:         
Age        x 
Disability    X     
Ethnicity    X     
Sex    X     
Gender reassignment    X     
Marriage and Civil
Partnership 
X     
Pregnancy and Maternity    X     
Religion    X     
Sexual Orientation    X     
Fairer Scotland Duty:         
Mainland rural population        x 
Island populations    X     
Low income         X 
Low wealth        X 
Material deprivation        X 
Area deprivation        X 
Socio-economic background        X 
Communities of place        X 
Communities of interest        X 
If you have identified any impacts on service deliverers, explain what these will be. 
If any ‘don’t knows have been identified, at what point will impacts on these groups
become identifiable? 
The Proposal has a consultation period that runs from June 15th 2023 to September 13th 2023
where all interested parties can submit a written representation. A public meeting will be held
on August 29th 2023 where interested parties can ask questions of the Proposal.

Page 124

124 
How has ‘due regard’ been given to any negative impacts that have been identified? 
In looking at the educational benefits statement of this proposal these have been considered.
All information is contained in the proposal paper in Appendix 1 or to read online: 
Minard Primary School Proposal Paper 
Section 4: Interdependencies 
Is this proposal likely to have any knock-on effects for any other activities carried out
by or on behalf of the council? 
Potentially on transport, as more children may require transport who may move into the
catchment area. 
Details of knock-on effects identified 
Increased number of children requesting free school transport may add pressure to the
transport system. 
Section 5: Monitoring and review 
How will you monitor and evaluate the equality impacts of your proposal? 
The Education Central Team including locality Education Managers will monitor the impact
this catchment area change would have, if implemented.

Page 125

125 
APPENDIX 3 - WRITTEN CONSULTATION RESPONSES   
Argyll and Bute Council Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access
restricted to Elected Members and Council Officers of Argyll
and Bute Council. 
Proposal 
It is proposed that: 
Education provision at Minard Primary School be discontinued with effect from 31st May 2024.
The catchment areas of Lochgilphead and Furnace Primary Schools shall be extended to include
the current catchment area of Minard Primary School – to the extent that the north section of
Minard’s catchment area (from Achagoyle Bay to Blackstone Bay) will be subsumed by Furnace
Primary School; and the south section of Minard’s catchment area (from Achagoyle Bay to
Kilmichael Beg) is subsumed by Lochgilphead Primary School. 
This part of the form must be completed for a valid response: 
Name: (please print) 
Anne Paterson
Address: 
Auchbeag, Minard,
By Inveraray, Argyll    
Post Code: PA32
8YB
I agree (delete which does not apply) that my response can be made publicly available 
Signatur e: 
Date: 
8th September 2023

Page 126

126 
Parent    
Child /  
Young Person  Staff                 Other  *
X   
Elected Member / MSP / MP      Member of Community Council   
*Other: (please specify) 
Resident of Minard – Ex HT of Minard Primary, Ex Parent, 
Please state your views on the proposal (continue overleaf if necessary) 
I agree with the proposal to now discontinue education provision at Minard Primary due to the low
number of eligible pupils within the village. 
However I am concerned with the school catchment area being split and the potential to further
fracture the cohesion of the community. We are a small rural community who are working hard to
engage with the whole community and to build community cohesion. My views are that the
segregation of the catchment area would not support the ambition to build community cohesion. 
My own views are that the catchment area should be subsumed into the Furnace Primary School
Catchment area. Both schools have been in a shared headship now for many years and have built
a wider community around the schools. Furnace is still a small school and provides the village
school model rather that the bigger rural town model at Lochgilphead Primary. 
We need to ensure that rural schools and their communities continue to be an important part of
Education delivery in Argyll and Bute.

Page 127

127 
Argyll and Bute Council: Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access
restricted to Elected Members and Council Officers of Argyll
and Bute Council. 
Proposal 
It is proposed that: 
Education provision at Minard Primary School be discontinued with effect from 31st May 2024.
The catchment areas of Lochgilphead and Furnace Primary Schools shall be extended to include
the current catchment area of Minard Primary School – to the extent that the north section of
Minard’s catchment area (from Achagoyle Bay to Blackstone Bay) will be subsumed by Furnace
Primary School; and the south section of Minard’s catchment area (from Achagoyle Bay to
Kilmichael Beg) is subsumed by Lochgilphead Primary School. 
This part of the form must be completed for a valid response: 
Name: (please print) 
Laura and Michael Skelton
Address: 
Tullochgorm, Minard, Argyll    
Post Code: PA32 8YQ
I agree that my response can be made publicly available 
Signature: 
Laura A Skelton
M J Skelton
Date: 
11/09/2023
11/09/2023  
YOUR INTEREST: (please tick) 
Parent    
Child /  
Young Person  Staff                 Other  * 
Elected Member / MSP / MP      Member of Community Council   
*Other: (please specify)

Page 128

128 
40 years residency at Tullochgorm, Minard, parents of two children who previously attended
Minard Primary School, previously actively involved in the school board, playgroup, and founder
member of the After School Club.  Retired teacher. Retired Care Commission Officer. 
Please state your views on the proposal (continue overleaf if necessary) 
.
The proposal to partition the Minard School catchment area is potentially detrimental and serves
no purpose.   
Travel time/distance to Lochgilphead is approximately three times longer than travel time/distance
to Furnace. Additionally the route to Furnace can be considered safer due to much of the road
being within a 40 mph speed limit whereas the route to Lochgilphead has almost entirely a 60 mph
speed limit.  In terms of pupil welfare and safety Furnace should be the preferred option.   
The Minard community situated to the south of the proposed catchment boundary comprises
approximately thirty dwellings and has always been an integral part of the village.  To separate
future pupils from the same village community by sending them to schools in  opposite directions
runs counter to supporting communities and maintaining rural village identity and social integration.

Page 129

129 
Argyll and Bute Council Education 
RESPONSE FORM 
I wish my response to be considered as confidential with access
restricted to Elected Members and Council Officers of Argyll
and Bute Council. 
Proposal 
It is proposed that: 
Education provision at Minard Primary School be discontinued with effect from 31st May 2024.
The catchment areas of Lochgilphead and Furnace Primary Schools shall be extended to include
the current catchment area of Minard Primary School – to the extent that the north section of
Minard’s catchment area (from Achagoyle Bay to Blackstone Bay) will be subsumed by Furnace
Primary School; and the south section of Minard’s catchment area (from Achagoyle Bay to
Kilmichael Beg) is subsumed by Lochgilphead Primary School. 
This part of the form must be completed for a valid response: 
Name: (please print) 
MARGARET MONCUR
Address: 10 ACHAGOIL
MINARD 
Post Code: PA32 8YE
I agree/do not agree (delete which does not apply) that my response can be made publicly
available 
Signature: 
Date: 11/9/23    
YOUR INTEREST: (please tick) 
Parent    
Child /  
Young Person  Staff                 Other  *  X 
Elected Member / MSP / MP      Member of Community Council

Page 130

130 
*Other: (please specify) 
Minard Resident, Parent of former Pupils
Please state your views on the proposal (continue overleaf if necessary) 
While I agree that this is the best option i.e. move to formal closure, splitting the village by
realigning the catchment areas to Lochgilphead and Furnace will reinforce a fragmented
community. It would be better if they could all go to the same school but in stating that I am
conscious that several parents are already “ voting with their feet” with placement requests to
Inveraray PS. 
May I take this opportunity to thank all those involved with Minard School over past years. Both my
children enjoyed and benefited from their time at Minard School.

Page 131

131 
From: Colum Elkin <elkin.inverae@gmail.com
Date: 13 September 2023 at 21:08:11 BST
To: argyllhousereception@argyll.gov.uk
Subject: Minard Primary School 
Dear Sir/Madam 
Can I first ask if the attached notice was displayed on the Minard community notice
board?  If it was - I didn’t see it, and I view the notice board regularly.
I saw this notice in Inveraray Co-op AFTER the event in Minard primary school had
taken place.  I would certainly have attended had I known about it.
I am also a teacher and didn’t hear anything about the event in connection with my job
either.
If I didn’t know about it, I wonder how many others also didn’t know about it?
I am VERY disappointed in this apparent lack of proper consultation. 
I do think there is a strong case for Minard Primary School to be reopened, a ‘halfway
house’ in between the larger Inveraray and Lochgilphead schools, and would like my
views in this respect to be formally put forward. Too many smaller schools are being
closed to the detriment of communities and children who would thrive in a smaller, more
nurturing environment. 
KarenElkin 
(Local resident and Teacher)

Page 132

132 
APPENDIX 4 PUBLIC MEETING MINUTES 
Minard Primary School Public Consultation Meeting
Held in Minard Primary School on 29 August 2023 at 7pm 
Panel
Yvonne McNeilly, Policy Lead for Education 
Daniel Hampsey, Depute Policy Lead for Education 
Douglas Hendry, Executive Director 
Jen Crocket, Chief Education Officer/Head of Education-Wellbeing, Inclusion and Achievement
Wendy Brownlie, Head of Education – Performance and Improvement 
In attendance 
Graeme McMillan - Transformation Programme Manager
Annette Trevelyan – Education Officer
Simon Ross – Education Scotland 
Admin:
Fiona Ferguson – Directorate Support Officer
Laura Blackwood – Directorate Support Officer 
Councillor J Brown 
Councillor D Philand
9 Members of the public 
Welcome and introductions were made by Councillor McNeilly. 
Mr Hendry outlined the objective of tonight’s meeting, the proposal itself and the statutory process
which the Education Service must follow. 
Ms Crocket and Mrs Brownlie then spoke to a prepared presentation on the proposal this included,
the background to the proposal, the reasons for the proposal, the educational benefits which the
Council believe would be achieved upon implementation of the proposal and information on how
stakeholders can submit formal responses to the consultation. 
Questions were also taken from the audience. 
Audience
In relation to the timeframe what takes place from June 2023 to May 2024? 
Panel Response

Page 133

133 
Once the consultation period closes, the children who are in the current catchment area for Minard
and could attend primary school will have the opportunity to speak to Education Scotland.
Education Scotland will then formulate their report and submit this to the Education Service. All the
feedback from focus groups, stakeholders, the consultation and this meeting, together with the
Education Scotland report, will be taken into account. The Service will then produce a further report
which will go to the next available Community Services Committee for a decision on closure, which
is likely to be in March 2024. 
Audience 
Does this report then go to the full Council for a decision? 
Panel Response 
No, there is no need for this to go a Council meeting. The Community Services Committee has full
delegated powers to take a decision. 
Audience 
How is the Council facilitating the responses to the consultation? 
Panel Response 
Comments made here tonight will be noted and fed into the process.  
The proposal paper, summary report and a response form is on the Council’s website and this form
can be completed and sent in. 
Closing date for the consultation is Wednesday 13 September 2023. 
Audience 
What are the Council doing to promote this consultation? The community only knew it was
happening from a poster which was in the co-op, why was one not put up in the village? 
Offer for the consultation to be publicised on the Minard community facebook page. 
Panel Response 
In terms of the statutory consultation process the Service have carried out what is required. Notice
about the consultation was given to all of the relevant consultees, and the Notice was also posted
on the Council website. This was also advertised through social media and posters. It is a matter
of regret that this was not taken further with one being placed in the village. 
Suggested that additional social media posts can be put out to further highlight the consultation
period.

Page 134

134 
Audience 
Two significant points here the process as a whole and the process for
engagement/communications need to improve. 
Audience 
In regard the proposed catchment areas having the line as is currently stands could cause different
social interaction which would be a shame. 
Panel Response 
At the point when the school was mothballed, the discussions at that time with the parents informed
this catchment boundary. The catchment area does not stop a placing request to another school
outwith the catchment area being made. 
Audience 
If parents choose to send their children to a school outwith the catchment area they would be
responsible for getting them there and incurring that cost. This could lead to parents having an
inequality of choice as some parents who can’t afford to take their children to their choice of school
would have to stay within the catchment area.  
Why is there a split to Furnace and Lochgilphead as its 4 miles to Furnace and 14 miles to
Lochgilphead? 
Panel 
Based on the discussions previously held with families when the school was initially mothballed,
this approach was deemed to have regard to those views, allowing a degree of choice of school.   
Audience 
This is a pointless change – they are all members of the same village why do this? 
We need to future proof – these are fragile communities and this split gives the wrong message. 
Panel 
This is a just one proposal, if there was a clear view from this evening and from other responses
this would be taken into account when the final proposal is being produced. 
Our first priority would be the views from the families with children who are affected by this proposal.

Page 135

135 
Audience 
How does this proposal fit as the Education Act states that a school can only be closed for
educational benefit reasons? Is this just to provide further information? 
Panel 
Yes, all these factors have an impact. 
Audience 
If children were not transported by parents to school would pupils travel on the service bus with
secondary children? 
Panel 
The Transport Team would advise us what transport arrangements would be available for the
children. Assessments if required can be carried out for a child who has additional support needs.
The Education Service work closely with colleagues the Transport Team. 
Whatever is put in place will be safe and legally compliant. 
Audience 
Keen to see educational improvements in the area. What will the savings that would be made from
this proposal be used for? Have you looked at the possibility of improving pre-school provision in
the community? 
Panel 
Where there are satellite schools we have found that parents choose to take their children to the
town where they work. 
When 1140 hours policy was implemented a significant exercise was undertaken at that time to
find out where children were located across Argyll and Bute. 
This building would not meet Care Inspectorate requirements and this is not something we have
considered in regard to Minard, however the Service are willing to offer advice and support to any
toddler groups. 
Audience 
What forecasting mechanism is being used to forecast future numbers of children?

Page 136

136 
Panel 
Our roll projections are based on a range of factors, including age, social and economic data,
planning applications to name a few.  We have re-gained access to NHS records, which are also
key in determining roll projections. 
Older population is not peculiar to Minard, in an educational context this is a factor but at a national
level there is no joined up or co-ordinated approach to demographics. 
Audience 
There are no children in the school and even if the school was re-opened parents would chose not
to attend Minard. 
Two points to do the right thing for families and children – need to mark the memories. 
No real choice for parents as there is no wrap around care in Minard or Furnace therefore Inveraray
or Lochgilphead are the only choices. 
Panel 
As wrap around care is not a statutory duty the Council do not receive funding to provide this. 
The Education Service is willing to engage with communities to help them provide out of school
hour care for school aged children. 
Audience 
In terms of transport, does the arrangements for this only begin when a decision is made and does
this apply to what will happen to the school building? 
Panel 
The community can develop thinking now but no decision on the future of the school will be taken
until the March 2024 Committee. 
Reference was made to previous processes e.g. Achnamara and Ardchattan where the school was
transferred to the community. There are a number of ways of pursuing this. 
Audience 
Did the council facilitate this? 
Panel

Page 137

137 
The Council does have some resource looking at 3rd sector and Community Empowerment Act.
You would need to have some idea of what you wanted to pursue before you come in to engage. 
Other community groups who have completed similar transfers may be able to assist. 
Audience 
What is the legal situation in regard to the title of the school? 
Panel 
The Council's title to the building was obtained from Thomas Owen Lloyd in favour of the School
Board of the Parish of Glassary in 1906. Legal Services and Estates indicate there is a burden in
the title from 1906 to the effect that the subjects are to be used for educational purposes and for
no other purpose. However Conveyancing Team within Legal Services have investigated and in
providing a copy of the title plan it clearly shows that the area of ground in question was in fact
within the Council's school title and it was transferred to the Community Trust in 2006 
This process would need to conclude before any further work would be undertaken in regard to the
titles. 
Audience 
Would it be possible to be passed on details of the Lloyd Trust to the community if available? So
we can make our own enquiries. 
Panel 
Yes if we have these they can be passed over. 
Councillor McNeilly thanked everyone for their attendance and expressing their views and closed
the meeting.

Page 138

138 
APPENDIX 5 - EDUCATION SCOTLAND REPORT 
Schools (Consultation) (Scotland) Act 2010 
Report by Education Scotland addressing educational aspects of the
proposal by Argyll and Bute Council to discontinue education
provision at Minard Primary School and to realign the catchment
area to Lochgilphead and Furnace Primary Schools. 
September 2023

Page 139

1. Introduction 
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of Argyll and Bute Council’s proposal to discontinue education provision at Minard
Primary School and to realign the catchment area to Lochgilphead and Furnace Primary Schools.
Section 2 of the report sets out brief details of the consultation process. Section 3 of the report sets
out HM Inspectors’ consideration of the educational aspects of the proposal, including significant
views expressed by consultees. Section 4 summarises HM Inspectors’ overall view of the proposal.
Upon receipt of this report, the Act requires the council to consider it and then prepare its final
consultation report. The council’s final consultation report should include this report and must
contain an explanation of how, in finalising the proposal, it has reviewed the initial proposal,
including a summary of points raised during the consultation process and the council’s response
to them. The council has to publish its final consultation report three weeks before it takes its final
decision. Where a council is proposing to close a school, it needs to follow all statutory obligations
set out in the 2010 Act, including notifying Ministers within six working days of making its final
decision and explaining to consultees the opportunity they have to make representations to
Ministers and the special provisions that apply to proposals to close a rural school. 
1.2 HM Inspectors considered:
• the likely effects of the proposal for children of the school; any other users; children likely to
become pupils within two years of the date of publication of the proposal paper; and other
children in the council area;
• any other likely effects of the proposal;
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs. 
1.3 In preparing this report, HM Inspectors undertook the following activities:
• attendance at the public meeting held on 29 August 2023 in connection with the council’s
proposals;
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others; and
• visits to the site of Inveraray Primary School, Furnace Primary School and Lochgilphead
Joint Campus, including discussion with relevant consultees. 
1.4 As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of any reasonable alternatives to closure of Minard Primary School, the
likely effect on the local community and the likely effect of any different travelling arrangements of
the proposed closure.

Page 140

2. Consultation process 
2.1 Argyll and Bute Council undertook the consultation on its proposal with reference to the
Schools (Consultation) (Scotland) Act 2010. 
2.2 The council undertook the consultation between 15 June and 13 September 2023. The
proposal was communicated via the council website and a copy provided to key stakeholders. The
consultation paper was made available in several local venues and council offices. Argyll and Bute
Council held a public meeting at Minard Primary School on 29 August 2023. This was attended by
nine members of the local community, local elected members and council officers. No parents
attended. The council received five responses to the online consultation and almost all agreed with
the proposal to close the school. 
2.3 Overall, all attendees at the public meeting and those who responded to the consultation
agree that Minard Primary School is no longer viable. While they are disappointed to lose the
school within the village, they agree that it should close. However, several local residents are
concerned about the council’s proposal to split the Minard Primary School catchment between
two different primary schools. In their responses, they have suggested an alternative proposal to
realign the whole of the Minard catchment to Furnace Primary School. This would, in their view,
help to maintain a unified village and local community identity. The council should consider this
alternative proposal and assess if this would be a suitable alternative to their original proposed
alignment. Discussions at the public meeting also focused on the potential future use of the site. If
the council decides to close the school, they should continue to work with the local community to
explore alternative uses for the school and grounds. 
3. Educational aspects of proposal 
3.1 The council has set out clearly the educational benefits arising from the proposal for
children from the Minard Primary School catchment to attend either Lochgilphead Primary School
or a split placement between Furnace and Inverary Primary Schools. The council has considered
and highlighted the positive educational benefits in relation to: learning and teaching; meeting
learners needs; broadening the range of educational experiences; and the environment for
learning. HM Inspectors agree that there can be educational benefits for children, including
opportunities to learn, develop and socialise with a wider group of peers. The council has
highlighted one negative aspect around additional travel. However, HM Inspectors agree that the
positive aspects of the proposal outweigh this negative aspect. 
3.2  Almost all staff, parents and children, that HM Inspectors met with, agree with the council’s
proposal to permanently close Minard Primary School. A few people were unhappy that there
would no longer be an option for children to attend a school in the village in the future. They did,
however, understand the reasons why the council was proposing closure. The children that
HM Inspectors spoke with, who attend either Furnace/Inveraray Primary Schools or Lochgilphead
Primary School, are happy with the current arrangements. Almost all of them said that they would
not wish to attend Minard Primary School if it were to re-open. All of the children who live in Minard
hope that the school and the grounds can be repurposed in the future for the benefit of the local
community. 
3.3 As the proposal will lead to the closure of a rural school, HM Inspectors also took account of
the council’s consideration of the factors to which it should have special regard. 
3.4 The council took appropriate steps to consider reasonable alternatives to closing Minard
Primary School through an options appraisal and engagement with stakeholders prior to moving

Page 141

ahead with the consultation. The alternatives included: re-opening Minard Primary School;
continuing to mothball Minard Primary School with the pupils zoned to Furnace Primary School;
and closing Minard Primary School and realigning its catchment area to Furnace and Lochgilphead
Primary Schools. The council has considered the impact on the community if the school is closed.
The school, which was in the past a hub within the village, has the potential to be repurposed. This
could have a positive impact on the local community in the future. The council has also considered
the likely effect of different travelling arrangements, which would essentially be the same as those
in place while the school has been mothballed. The travelling time between Minard and
Lochgilphead is around twice the time between Minard and Furnace. In finalising the alignment of
catchment boundaries, the council may wish to consider the alternative suggestion to realign the
whole of the Minard catchment area to Furnace Primary School. 
4. Summary 
HM Inspectors agree that there are potential educational benefits for children arising from the
council’s proposal to close Minard Primary School. For example, that there can be more
opportunities for them to learn, develop and socialise with a wider group of their peers. A few
stakeholders have questioned the proposal to split the Minard catchment. The council should take
these views into consideration when finalising the alignment of catchment boundaries, if they
decide to close Minard Primary School. The council should also work with the local community,
including children and young people, to consider any alternative use for the school and grounds
taking account of local needs, views and aspirations. 
HM Inspectors
September 2023

Page 142

APPENDIX 6 - PUPIL FOCUS GROUP RESPONSES
Lochgilphead Primary
Date of Pupil
Consultation
4/9/23
School for proposed
closure
Minard Primary School
Staff member(s)
Leading.
Number of children /
age range.
Cathleen MacDonald 
4 children – aged from P4 to P7 
Background information for
pupils
• I am meeting with you today because the Council want to find
out your views, about Minard Primary School being closed.
This process of asking for your views is called a consultation.
• This consultation is anonymous – which means your words
and ideas may be used in public reports that are written, but
your name won’t be written with your words and ideas. 
• We want to consult with you to find out what you think about
the Council’s proposal to close Minard Primary School. The
Council is proposing this because 
- There many pupils from the area that would go to
Minard and this number isn’t going up.
- It’s getting expensive to keep looking after a building
that isn’t being used.  
• It is important that we find out your thoughts and opinions
because you are the most current pupils that went to that
school so your views are important and this will help us make
a decision for pupils that would be future pupils at Minard
Primary School.
• Closing the school isn’t the only option for Minard Primary
School –
- It could re-open.
- It could continue to be ‘mothballed’ – which means it’s
temporarily closed like it is now.
- Close Minard PS and change the catchment area for pupils
to go to other schools nearby. 
If you went to Minard tell us a
little bit about going to school
at Minard PS. 
N/A
What do you think the
positive things would be if
Minard PS closed?
• New houses could be built
• The building could be given to Minard Community
Council to be used as a community building.
• It could be used as a football pitch or play park.
• Children can go to a bigger school in Lochgilphead
where there are more opportunities.
Do you have any concerns
about Minard PS closing?
• It would mean that there would be no local school as an option
for any new children in the village.

Page 143

What might other people be
concerned about if Minard PS
closed? 
• Other people in the village have said they would rather it
closed. 
If Minard PS closed is there
anything that would help
make this easier for pupils
from Minard PS going to
another school?
• There is already a bus to take children to school in
Lochgilphead however, there needs to be a safer crossing to
the bus stop. 
Do you have any other
comments about this that you
want to add?
• The school needs cleaned up and made safe.
• There should be security cameras and ‘no littering’ signs put
up. 
• If you have more ideas please let your teacher know.
• If anything we have chatted about today has made you worried
remember you can talk to your class teacher or your parents. 
Furnace / Inveraray Primary 
Date of Pupil
Consultation
7th September 2023
School for
proposed
closure
Minard Primary School 
Staff
member(s)
Leading.
Number of
children /
age range.
Sandra Clarke 
4 pupils; aged P2  to P6 
Background information
for pupils
• I am meeting with you today because the Council want to find out
your views, about Minard Primary School being closed. This
process of asking for your views is called a consultation.
• This consultation is anonymous – which means your words and
ideas may be used in public reports that are written, but your name
won’t be written with your words and ideas. 
• We want to consult with you to find out what you think about the
Council’s proposal to close Minard Primary School. The Council is
proposing this because 
- There many pupils from the area that would go to Minard
and this number isn’t going up.

Page 144

- It’s getting expensive to keep looking after a building that
isn’t being used.  
• It is important that we find out your thoughts and opinions because
you are the most current pupils that went to that school so your
views are important and this will help us make a decision for pupils
that would be future pupils at Minard Primary School.
• Closing the school isn’t the only option for Minard Primary School –
- It could re-open.
- It could continue to be ‘mothballed’ – which means it’s
temporarily closed like it is now.
- Close Minard PS and change the catchment area for pupils to
go to other schools nearby. 
If you went to Minard tell
us a little bit about going
to school at Minard PS.
No children previously attended Minard Primary School.
What do you think the
positive things would be
if Minard PS closed?
Children have better opportunities for learning in a bigger primary school.
The building could be used for something else, a hotel, meeting place or
supporting the community.
Children will make more friends in bigger schools.
It would save money and the money could be used for other schools.
Do you have any
concerns about Minard
PS closing?
I wonder what would happen to the building.
Could we use some of the resources that are there as it would be a
shame to waste them.
I worry that there are not many families or children in Minard.
What might other people
be concerned about if
Minard PS closed? 
Having to drive to other schools. If Minard was open, they could walk
to school. 
If Minard PS closed is
there anything that
would help make this
easier for pupils from
Minard PS going to
another school? 
Provide a school bus for children but this would add to climate
change and pollution. 
Do you have any other
comments about this
that you want to add? 
If it was closed we could play football there.
If Minard children come to Inveraray, we would make them feel
welcome. 
• If you have more ideas please let your teacher know.
• If anything we have chatted about today has made you worried
remember you can talk to your class teacher or your parents.