Democracy Spraffa

23-0565-PP St Josephs FINAL

Renfrewshire Council · 5 November 2024
Back to Planning and Climate Change Policy Board — 5 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 5 November 2024 
Reference No 23/0565/PP
Application Type Planning Permission
Proposal Erection of 25 retirement flats with communal facilities and the
conversion of c listed former chapel into 5 retirement flats with
associated roads, parking and landscaping.
Location St Joseph's Nursing Home, Kilbirnie Road, Lochwinnoch
Ward 9 - Johnstone North, Kilbarchan, Howwood and Lochwinnoch
Community Council Lochwinnoch Community Council
Applicant Sitepride Ltd
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=S29ITUMWKHT00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The
Town and Country Planning (Development Management Procedure) (Scotland) Regulations
2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.   
Proposal
This application seeks planning permission for the erection of 25 retirement flats and the
conversion of a vacant C listed chapel to form an additional 5 retirement flats with associated
parking and landscaping at the former St Joseph’s Missionary College and Nursing Home site,
on Kilbirnie Road (A760), Lochwinnoch. 
The proposed development would comprise a three-storey building accommodating 25 flats
on the approximate footprint of the former dormitory building, to the north of the chapel and
for the refurbishment of the chapel to create a further 5 flats. The building would incorporate
14 two bed flats and 11 one bed flats and would be similar in height, scale, and massing to
the former buildings which previously occupied the site.  The elevation to the front would be
of domestic scale with a combination of masonry elements in two finishes and a mixture of
gable ends and parapet roofs of varying ridge heights.  The external materials would comprise
split face textured buff cast stone blockwork with buff brickwork gable bays and grey roof tiles
with feature aluminium cladding to windows and balconies in dark olive-green colour. The
material palette has been selected to reflect and complement the chapel building. 
A walled garden including a tower feature to the west of these buildings would be fully restored
to act as an open space amenity area for use by residents.  Car parking is to the front and
side of the development which will include accessible/disabled spaces and double electric
vehicle charging points.  Access would be as existing which is by way of a private single
tarmacked road from the Kilbirnie Road (A760).  The access road would be upgraded to
incorporate a footpath on its northern side which would link with existing footpath provision on
the A760 providing improved pedestrian access to the village. 
The properties proposed are earmarked for retirement purposes and as such marketed
exclusively to over 55s.   
Site Description

Page 2

The application site extends to 1.98 hectares and is located on the southwestern edge of
Lochwinnoch.  Immediately to the north, the application site is bounded by a series of single
storey buildings forming the Forest View Primary School beyond which Corsefield Road links
back to Lochwinnoch.  Further to the northeast there is an area of open land which is currently
the subject of a planning application for residential development (19/0766/PP).  To the east
are landscaped grounds under the ownership of the applicant which extend to the A760
Kilbirnie Road and comprise mature woodland and shrub planting. To the south is an area of
open land, also under the ownership of the applicant which extends to Auchenhean Road. The
site lies within the southern boundary of the Clyde Muirshiel Regional Park 
The site originally accommodated an early 19th century mansion house known as Garthland
House.  This was sold in 1935 to the Mill Hill Foreign Missionary Society when it became the
St Joseph’s College for Missionaries.  At that time the house was extended to the north with
the addition of a three-storey dormitory block and further extended in 1943 with the addition
of a chapel.  The seminary closed in 1985 and a Nursing Home use was established.  The
Nursing Home closed in 2005 and the buildings have since seen a rapid deterioration being
subject to vandalism, theft and arson rendering them unsafe and requiring selective
demolition.  Currently, only the Dormitory Block and Chapel, both C listed, remain standing
both in poor condition.  Due to its severely compromised condition, listed building consent was
granted for the demolition of the Dormitory block in 2020. The chapel building is in slightly
better condition albeit identified as a Building at Risk in the Buildings at Risk Register for
Scotland.  The western part of the application site comprises a former walled garden and tower
feature, associated with the original dwelling which existed on the site (Garthland House).  The
walled garden is elevated relative to the ground on which the chapel and former dormitory
building stand. The garden has not been maintained for many years and is also in a poor state
of repair. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
No pre-application discussions have taken place. 
Negotiated Improvements
Changes to the proposal have been negotiated including improved parking provision, and
pedestrian connections from the site to village and station. 
Site History 
The planning history for the site is as follows; 
Application No: 23/0566/LB 
Description: Alterations and conversion of former chapel building to form 5 retirement
flats.
Decision: Under consideration 
Application No: 20/0813/LB 
Description: Demolition of C listed dormitory block.
Decision: Grant subject to conditions 
Application No: 13/0007/PP 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated

Page 3

landscaping. (amendment to Condition No. 1 of 07/0724/PP to extend the
time period of consent)
Decision: Withdrawn 
Application No: 13/0011/LB 
Description: Vary condition one of previous application 07/0724/PP to extend the time
period of consent.
Decision: Withdrawn 
Application No: 07/0725/LB 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated
landscaping. 
Decision: Grant subject to conditions 
Application No: 07/0724/PP 
Description: Conversion of existing building to form 30 flats and selective demolition of
outbuildings, upgrading of access roads, car parking and associated
landscaping. (NEW HOUSING DEVELOPMENT)
Decision: Grant subject to conditions 
Application No: 95/0509/PP 
Description: Erection of new office buildings.
Decision: Grant subject to conditions 
Application No: 94/0838/LB 
Description: Subdivision of existing multi bedrooms and wards to form single bedrooms.
Decision: Withdrawn 
Application No: 03/0709/PP 
Description: Construction of a 7/8 bedroom residential care home, extension to existing
access and formation of parking.
Decision: Grant subject to conditions 
Application No: 02/0905/PP 
Description: Demolition of existing wing of nursing home and erection of new building to
form extension to existing nursing home.
Decision: Grant subject to conditions 
Consultations   
Chief Executive's Service (Roads Development) – No objection subject to conditions,
including upgrading of parking provision, pedestrian linkages to village and station and
sightlines. These issues can be covered by a condition attached to any grant of planning
permission. 
Environment, Housing & Infrastructure (Env. Protection) – No objection subject to
conditions requiring the submission of Site Investigations, Remediation Strategy and
implementation Plans prior to the commencement of development and Verification Reports
prior to occupation. 
Scottish Water – No objection. 
Childrens Services (Education) – No objection.

Page 4

SEPA - No objection. 
Flooding/Drainage Consultants – No objection subject to compliance with drainage and
Flooding Strategy Reports. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received: 
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the development
plan unless material considerations indicate otherwise. In this instance the Development Plan
consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development
Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the determination
of this application: 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation 
Policy 3 – Biodiversity
Policy 4 – Natural Places
Policy 6 – Forestry, woodland and trees
Policy 7 - Historic assets and places
Policy 8 – Green Belt
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 14 - Design, quality and place
Policy 15 - Local Living and 20 minute neighbourhoods
Policy 16 - Quality homes 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Policy P1 - Renfrewshire's Places
Policy P2 - Housing Land Supply
Policy ENV 2 – Natural Heritage
Policy ENV3 - Built and Cultural Heritage
Policy I1 – Connecting Places
Policy I7 – Zero and Low Carbon Buildings 
Full details relating to the policies of the LDP can be found online. 
Supplementary Guidance
Delivering the Environment Strategy
Delivering the Infrastructure Strategy
Delivering the Places Strategy 
Material Considerations
Renfrewshire Council's Residential Design Guide 
Renfrewshire Planning & Development Tree Policy – 2022
Historic Environment Scotland's Historic Environment Policy for Scotland (HEPS) 2019 and
associated "Managing Change in the Historic Environment" guidance notes. 
Submitted Reports and Assessments

Page 5

In assessing and reporting on a planning application the Council is required to provide details
of any report or assessment submitted as set out in Regulation 16, Schedule 2, para 4(c) (i)
to (iv) of the Development Management Regulations. 
The following reports and assessments have been submitted in support of the application. 
Transportation Statement – An accessibility review was undertaken which confirmed that the
site has good accessibility and provides future residents and visitors with the opportunity to
undertake informed and sustainable travel choices.  It also confirmed that the traffic generation
from the proposed development would be minimal and would have no material impact on the
safe operation of the local road network.  It states that car parking provision would be provided
in accordance with Renfrewshire Council parking standards for both residents and visitors. 
Drainage Strategy Report – It states that foul sewerage from the development will be conveyed
to the package treatment plant and discharged to an existing connection.  Surface water run-
off from areas of new external hardstanding would incorporate SUDS measures to treat and
attenuate the surface water run-off to the agreed discharge limits and source control SUDs
features would be provided in line with the SEPA Simple Index Tool. 
Flood Risk Assessment - The report states that all sources of flood risk (rivers, surface water,
sewers, groundwater and artificial sources) have been assessed. It concludes that through
the development of the site and the upgrade to the local surface water drainage arrangement,
any local surface flooding issues would be improved. 
Preliminary Ecological Appraisal and Bat Survey Report – The report concludes that habitat
loss would be limited given development work will be predominantly located within the footprint
of existing buildings and hardstanding. It is recommended that small scale vegetation loss
shall be mitigated through such measures as retaining existing vegetation and enhancing
where possible and compensatory planting should be undertaken where this is not possible. 
Native tree and species rich grassland planting should be used.  In addition, a Tree Protection
Plan, Landscape and Ecological Management Plan and Invasive Species Management Plan
should be prepared and implemented.   
Tree Survey Planning Report – The Tree Survey inspected 59 individual trees, with an age
range between 20-138 years (estimated).  Some of the trees are within the main impact area
of development and others will require protection during construction. The trees comprise 21
species featuring 5 magnificent mature (A category) trees, two Giant Redwoods, one Coast
redwood, and Western Hemlock and one Beech.  Sixteen trees require removal on health and
structural condition grounds, and three on removal for development.  The 3 trees requiring
removal due to development are category C Lawson Cypress. 
Design & Access Statement – It is stated that the design proposals have been developed with
Design Quality and Placemaking considerations at the forefront of the design process.  As a
result, it is professed that the submitted development proposals respond sensitively to the
existing site context, providing a distinctive retirement development that creates a positive
contribution to the local parkland context.   
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any Direction
made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant
of planning permission) and Regulation 33 (Directions requiring consideration of condition) of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town
and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017.

Page 6

None. 
Planning Assessment
National Planning Framework 4 (NPF4) provides the long-term national spatial strategy for
planning in Scotland. It sets out the Scottish Government's current view on delivering
sustainable, liveable, and productive places through the application of spatial principles. 
Policy 8 seeks to encourage, promote and facilitate compact urban growth and sustainable
development. In so doing the policy aim is to ensure that the character, landscape, natural
setting, and identity of settlements is protected and enhanced. It states that acceptable
uses/development include the intensification of established uses and the re-use, rehabilitation,
and conversion of historic environment assets. While the proposal does not fully conform with
either category it is evident that the proposal seeks to rehabilitate the listed buildings on site
insofar as this is achievable.  Furthermore, development is proposed on a site which
accommodated a variety of buildings and various residential uses until their decline in 2005. 
The predominant part of this proposal would therefore be new build, however, the setting and
mature landscaping of previous buildings remain and the building proposed is within the
previous building footprints. Consequentially, the proposal would assist in saving a heritage
asset while having little impact on the site and surroundings. It would in effect enhance the
site and its setting.   
The application site is covered by Policy ENV 1 of the Adopted Local Development plan which
raises similar considerations to the policy above. As such it is considered that the proposal
would also comply with spirit of Police ENV1. 
Policy 9 relates to the reuse of brownfield, vacant and derelict land and empty buildings.  The
chapel building has been vacant for a number of years and is in a state of disrepair.  The
proposals would bring the chapel building and surrounding land back into use utilising existing
infrastructure and would provide 30 new flatted dwellings within an established setting in what
has always been a type of residential area.  As such, it is considered that the proposed
development can be considered in accordance with policy 9. 
The development of the site for residential use would therefore comply with the development
plan in principle. However detailed consideration of the proposed development against the
provisions of the New Development Supplementary Guidance and the Residential Design
Guide is required. 
These documents set out a range of considerations that form the basis of good places design.
Each consideration will be assessed in turn. 
Context and Character
With regard to the context and character of the development, the land use is appropriate for
the location which has historically accommodated forms of residential development and the
development proposed has sought to be contained predominantly within the footprints of
former developed areas while reflecting the bulk, massing and design elements of previous
buildings. Due to the previous use of the site, adequate services and infrastructure are mostly
in place to serve the proposals. 
Sixteen trees require removal on health and structural condition grounds, and three on
removal for development.  The 3 trees requiring removal due to development are category C
Lawson Cypress and a landscape plan for the site would include native tree and species rich
grassland planting.  One other key landscape feature within the site is the remnants of the
walled garden established when Garthland House occupied the site back in the early 19th
century.  It has seen a rapid decline over the years and particularly since 2005.  The proposal

Page 7

seeks to re-establish, re-build and renovate this landscape feature including a diverse
landscaping plan.   
Landscaping for the wider development would also be provided and details can be considered
through the imposition of an appropriate condition. It is considered that the proposal would be
sympathetic to the character and appearance of the surrounding area while vastly improving
its landscape character which would be complimentary to other residential properties within
the vicinity of the site. Overall, the development is considered to adequately address its
location in terms of context and character as set out within the Supplementary Guidance and
to satisfy the requirements of Policy 6 of NPF4. 
Access & Connectivity
Policy 15 advocates local living to encourage connected and compact neighbourhoods where
people can meet most daily needs within a reasonable distance of their home. Policies 13 and
I1 advocate good accessibility and connectivity to walking, cycling and public transport. 
The site is located on Kilbirnie Road, within the former St Joseph’s seminary site on the
southwestern edge of Lochwinnoch and lies to the northeast of the A760 Newton of Barr.  The
site is well placed in relation to walking, cycling and public transport access within
Lochwinnoch, with the village and local amenities being within the 20-minute neighbourhood
as specified within National Planning Framework 4.  The development proposals would
integrate with existing walking and cycling infrastructure in the area and provide access to
public transport.  This would ensure that residents and visitors are given the opportunity to
make travel choices and could be encouraged to travel by sustainable modes. 
In this regard the development will connect to the existing walking facilities on the A760
Newton of Barr which in turn provide a pedestrian link directly into the village.  The existing
footpath on the northern side of the A760 Newton of Barr would be upgraded as part of the
proposal  to create a safe and direct pedestrian route into the village.  This route is already
provided with street lighting also providing direct access to the closest bus stop in Main Street. 
Access to the development would be taken from the existing access on the A760 Newton of
Barr which provides a standard priority junction within the 30 mph speed limit.  The existing
access is provided with appropriate width to allow two cars to pass at the entrance and
sightlines from the junction are provided in line with the Roads guidelines with appropriate
visibility splays in each direction. The access road to the development would be improved with
a pedestrian footway provided on one side which will in turn connect to the existing footway
on the A760. The access road is currently provided with semi-informal passing places which
will be upgraded and formalised as part of the development proposals.   
Parking for the proposed development should be provided in accordance with Renfrewshire
Councils parking standards with 1 space per flat and 0.25 visitor spaces provide for each flat. 
This results in an overall provision of 57 spaces which includes 8 visitor spaces.  This would
be provided mainly to the front of the development within an existing parking area; however,
provision has been made for an overspill car park when required. Three parking spaces would
be accessible spaces with a further three spaces provided as Electric Vehicle Charging spaces
(EV spaces). The potential also exists for covered cycle parking and charging points. The
parking provision for the site and its overall distribution would be dealt with through a condition
attached to any planning permission granted.   
As such, it is considered the site offers suitable sustainable transport options to satisfy Policy
13, 15 and I1. 
The Council’s Chief Executive’s Service (Roads Development), have, subject to conditions,
offered no objection to the proposal.

Page 8

Layout and Built Form
The residential character of the area has been well established over the years with a variety
of residential type uses having occupied the site. Previous developments accommodated a
mix of residential scales, with a wide variety in heights and building forms. The proposed
development, although introducing a physical change to the site, seeks to reflect previous
layouts and scales of development and its surroundings taking particular account of the C
listed chapel building which remains on the site, and which forms an integral part of this
proposal.   
It is noted that the building was previously used as a nursing home and the layout is on
balance, considered acceptable in achieving an acceptable level of amenity for the flats. 
Overall, it is considered that the layout and built form would be acceptable and would not have
a detrimental impact on the character and appearance of the development and surrounding
area. 
As such it is considered that the development would comply with Policies 7 and ENV3. 
Environment and Community 
Policy ENV2 and the associated Supplementary Guidance seeks to ensure that development
proposals protect, and where possible enhance our natural assets including the Clyde
Muirshiel Regional Park.  This application seeks to redevelop a site previously occupied by a
variety of residential uses over many years and one which currently accommodates a variety
of ruinous buildings and degraded landscapes. The proposal would bring a site which is
currently vacant and unsightly into beneficial use, clearing the debris of previous uses and
providing an attractive development with reinstated attractive landscaped gardens. It would
improve the landscape character and visual amenity of the immediate area including heritage
resources including the chapel building and tower. The proposal would not conflict with
neighbouring uses and active travel opportunities would be improved through additional and
upgraded footpath provision and recreational access to the surrounding area would be
enhanced.   
Sixteen trees require to be removed from the site on health and structural condition grounds,
and three require removal to accommodate the development.  The 3 trees requiring removal
due to development are category C Lawson Cypress and a landscape plan for the site would
include native tree and species rich grassland planting.  An appropriate condition would be
attached with respect to landscaping and to secure the additional tree planting. 
Policy 6, Policy ENV2 and the Council’s Planning and Development Tree Policy seek to ensure
that due consideration is given to the safeguarding of trees as part of the proposed layout.
Policy 3 also seeks to enhance biodiversity. For the reasons discussed above, and information
provided within the Tree Survey and Ecological Appraisal submitted in support of the proposal,
it is considered that although trees would be removed due to the nature of the works, this
would be limited, and the proposed landscaping would ensure that appropriate measures
would be put in place in relation to biodiversity. 
Buildings and Design
As discussed above, it is considered that the proposed development including the demolition
of the derelict building on site and renovation of the c listed chapel would improve the character
and appearance of the surrounding area.  The development sensitively integrates into the
parkland context providing a sensitive response to scale and massing and would be in an
appropriate location in accordance with Policies 14 and 16.

Page 9

It is also considered that the development would ensure the re-use of a visually prominent
listed building and would have a positive impact on the character and appearance of the
surrounding area, as such it would comply with Policies 7 and ENV3. 
The buildings would also have a number of measures to reduce energy use and CO2
emissions including photo voltaic panels etc. in accordance with Policies 1, 2 and I7. 
It is not considered that the proposal would have a detrimental impact on privacy of adjacent
properties as due to its positioning and design, there would be no direct overlooking as a result
of the proposal. 
For the reasons set out above, it is considered that the proposal would be acceptable, the re-
use of the chapel building and of the former seminary site as a whole would have a positive
impact on the surrounding area and would accord with the relevant provisions of the
Development Plan.  
Section 75 Obligations
The Council is required to provide a summary of the terms of any planning obligation which is
required to be entered into under Section 75 of the Town and Country Planning (Scotland) Act
in relation to the grant of permission for the proposed development. 
None. 
Conclusion
In view of the above, it is considered that the proposal accords with the relevant provisions of
the Development Plan. There are no other material considerations. Planning permission
should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions. 
Reason(s) for Recommendation 
Material considerations which outweighed the presumption in favour of development
according with the Development Plan.  
Condition(s)         
1. No development shall commence on site until written approval of:
a) A site investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remediation works are
recommended therein. 
b) A remediation Strategy and Implementation Plan setting out the proposed
methods for implementing all remediation recommendations contained within the
site investigation report and including (where relevant) management plan and a
phasing plan showing how the site is to be subdivided for the purposes of
remediation implementation and/or verification reporting prepared in accordance
with current authoritative technical guidance, has been provided by the Planning
Authority.   
Reason: To ensure that the site will be made suitable for its proposed use. 
2. Prior to occupation of any unit:
a) A Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; and/or

Page 10

b) Where remediation works are not required bur soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use shall be
submitted to the Planning Authority and approved in writing. 
Reason: To demonstrate that works required to make the site suitable for use have been
completed. 
3. That before any development of the site commences, a scheme of landscaping, for the
site, shall be submitted to, and approved by, the Planning Authority; the scheme shall
include:  
a) details of any earth moulding and hard landscaping, grass seeding and turfing;  
b) a scheme of tree and shrub planting, incorporating details of the number, variety
and size of trees and shrubs to be planted;  
c) details of the phasing of these works; 
d) details on how retained trees will be protected through the construction phase
and future use of the site. 
Reason:  In the interests of the visual amenity of the area. 
4. That the details of the landscaping scheme approved under the terms of condition 3
above shall be carried out in the first planting season and seeding seasons following the
occupation of the buildings or the completion of the development, whichever is the
sooner; and any trees or plants which, within a period of five years from the completion
of the development die, are removed or become seriously damaged or diseased shall
be replaced in the next planting season with others of a similar size and species, unless
Renfrewshire Council as Planning Authority gives written consent to any variation.     
Reason: In the interest of the visual amenity of the area. 
5. That, prior to the commencement of development, a detailed schedule of the proposed
external finishes for the flats, together with a plan and schedule of the surface treatments
to be used on the roads, parking spaces, hardstandings and footpaths within the site
shall be submitted for the written approval of Renfrewshire Council as Planning
Authority. Thereafter, these shall be constructed only in accordance with such details as
approved to the satisfaction of Renfrewshire Council as Planning Authority.     
Reason: In the interest of the amenity of the area. 
6. That prior to the commencement of the development, details of all boundary treatments
to be formed shall be submitted for the written approval of Renfrewshire Council as
Planning Authority. Thereafter, all boundary fences and walls, including any retaining
walls as may be approved shall be erected prior to the occupation of the flats to the
satisfaction of Renfrewshire Council as Planning Authority.     
Reason: In the interest of the amenity of the area.  
7. That prior to the commencement of the development, details of footpath connections to
flat entrances within the site shall be submitted for the written approval of Renfrewshire
Council as Planning Authority. For the avoidance of doubt, this shall include footpath
levels, retention details and surface finishes. Thereafter, footpaths shall be constructed
only in accordance with such details as may be approved to the satisfaction of
Renfrewshire Council as Planning Authority. 
Reason: In the interest of the amenity of the area.

Page 11

8. That prior to the occupation of the first flat, cycle parking shall be provided, details of
which shall be submitted to and approved in writing by Renfrewshire Council as Planning
Authority.  
Reason: To ensure adequate provision for cycle parking. 
9.  That prior to the commencement of development full details of a waste strategy for the
development shall be submitted for the written approval of Renfrewshire Council as
Planning Authority. For the avoidance of doubt the strategy shall detail how bins will be
emptied and show the bin storage areas and any associated bin stores together with a
swept path analysis if bin lorries are to enter the site. Thereafter the waste strategy shall
be implemented in accordance with the approved arrangements to the satisfaction of
Renfrewshire Council as Planning Authority. 
Reason: In the interests of amenity. 
10.    That drainage/flooding measures outlined in the Updated Drainage Strategy Report by
Goodson Associates dated April 2024, Updated Flood Risk Assessment by Goodson
Associates dated April 2024 and additional requirements outlined in the Dougall Baillie
Associates email dated 26th April 2024, shall be implemented to the written satisfaction
of the planning authority prior to the occupation of the development hereby approved.   
Reason:  To ensure that the appropriate provision of drainage and flooding measures
where necessary. 
11.     That prior to the commencement of development, details of the pedestrian and vehicular
routes providing connections to the south, west and northwards shall be submitted for
the written approval of the planning authority and thereafter implemented as approved
prior to occupation of the development hereby approved. 
Reason:  To ensure appropriate connectivity to the village, bus routes and the station. 
12. That prior to the commencement of development details of the upgrading of the primary
access to the development from Kilbirnie Road (A760) including passing places, turning
facilities, lit footway and widening shall be submitted for the written approval of the
planning authority and thereafter implemented as approved prior to occupation of the
development hereby approved. 
Reason: In the interests of road safety. 
13. That prior to the commencement of development details of footway improvements along
the site frontage, including the provision of a 100mm freeboard and resurfacing shall be
submitted for the written approval of the planning authority and thereafter implemented
as approved prior to occupation of the development hereby approved. 
Reason: In the interests of road and pedestrian safety. 
14. That prior to the commencement of the development, details of covered cycle stands
and e-bike and mobility scooter charging points shall be submitted for the written
approval of the planning authority and thereafter implemented as approved prior to the
occupation of the development. 
Reason:  To facilitate active travel choices.

Page 12

16. That prior to the commencement of development details of car parking with a minimum
of 57 spaces including 25 spaces for the adjacent school, and 8 visitor spaces, with 5%
marked disabled shall be submitted for the approval of the planning authority, and
thereafter implemented as approved, prior to the occupation of the development.   
Reason: To ensure adequate parking provision within the site. 
Advisory Note(s) 
None 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
2051_100  Topographical Survey
2051_102 A Block Plan As Existing
2051_103 A Block Plan As Proposed
2051_110  Ground Floor Plan As Existing
2051_200 D Site Plan As Proposed
2051_310  Ground Floor plan As Proposed
2051_311  First Floor Plan As Proposed
2051_312  Second Floor Plan As Proposed
2051_313  Roof Plan As Proposed
2051_400  Sections through former chapel
2051_410  Sections through former chapel
2051_501  Former Chapel Elevations As
Existing
2051_510  Elevations As Proposed
2051_511  Former Chapel Elevations As
Proposed
2051_705  Tower 
For further information please contact Clare Murray, Development Standards Team, Email:
clare.murray@renfrewshire.gov.uk.