Report by Chief Planning Officer
Planning and Climate Change Policy Board: 27 August 2024 
Reference No 24/0362/LB
Application Type Listed Building Consent
Proposal Demolition of the Brown Institute (retrospective).
Location Former Renfrew Museum, The Brown Institute, 41 Canal Street
Ward 1 - Renfrew North and Braehead
Community Council Renfrew Community Council
Applicant Renfrewshire Council 
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SDZQU1MWHQB00 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation as the application seeks listed building consent (in
retrospect) for the demolition of a listed building. 
Proposal
Listed building consent is sought in retrospect for the demolition of the Brown Institute, a
category B listed building, in Renfrew. The building was located to the west of Canal Street
close to its junction with Ferry Road to the north and Station Road to the north-east. 
The building was constructed in the early twentieth century and was originally gifted to the
town by the provost, Andrew Brown. The building was initially used as a library with
associated reading room and a billiard room and subsequently for various other, mostly civic,
uses prior to its final use as a museum from 1997 to 2011. After the museum was relocated
to Renfrew Town Hall in 2011, the building lay vacant until its recent demolition. 
The demolition followed the serving of a Dangerous Building Notice by Renfrewshire
Council's Building Standards service in February 2024. The Notice required that steps be
taken to make the building safe within a three-month period, either by undertaking necessary
works to secure and shore up the building, or by demolishing it. The applicant and owner, in
this case Renfrewshire Council, determined that the works to secure and shore up the
building were prohibitively expensive such that the retention of the listed building was not
considered economically viable. As such, the decision was taken to proceed with demolition. 
Documentation submitted with the application includes a Statement of Justification and
associated appendices, including the results of a structural survey in 2022 and an economic
appraisal in 2023, both undertaken by external consultants. The findings within these
documents inform the Statement of Justification in concluding that demolition was
appropriate in satisfying two of the four tests for demolition of listed buildings set out in
Historic Environment Scotland and Development Plan policy.  These two tests refer
respectively to the retention of the listed building not being economically viable; and the
demolition being essential for delivering significant benefits to economic growth or the wider
community. 
Also included among the appendices submitted with the Statement of Justification is a
Conservation Statement prepared following the issuing of the Dangerous Building Notice.
This contains a statement of significance which in turn informs a demolition plan identifying
specific features for retention and potential reuse and/or safe keeping. These include the

Page 2

main door, as well as carved panel stonework and an oriel window corbel situated above the
door, leaded windows and a cupola situated on the roof ridge. Two plaques situated either
side of the front door and a further plaque on the side of the building commemorating the site
of Renfrew Castle have also been retained. 
Site Description
The Brown Institute was located at the north end of Renfrew Town Centre and stood
prominently on the west side of Canal Street close to its junction with Ferry Road to the north
and Station Road to the north-east. 
The building was of a broad square footprint and consisted of two storeys at the front and
three storeys at the rear. The building featured a symmetrical red sandstone ashlar frontage
facing south-east, with various architectural features of note. These included two large
round-headed iron-framed windows at ground level either side of a round-headed front
entrance door set within a square-headed architrave containing a fanlight. A decorative
inscription was also situated above the front door whilst two decorative pilasters were
situated on either side which merged with corbels above to support a large projecting iron-
framed oriel window at first floor level. The roof featured Scottish slates and a central art
nouveau cupola on its ridge. 
The building adjoined a three storey red sandstone building on its south-west side featuring
commercial ground floor uses, with tenement flats at first and second floor level. On its
opposite north-east side, the building featured a predominantly grey rendered wall which
overlooked a small landscaped public space. The rear elevation faced towards a pair of
semi-detached houses at an angle, beyond which it also faced the former Renfrew Parish
Council Chambers, also a category B listed building. The rear elevation was of a less formal
asymmetrical design, featuring additional iron-framed windows including a further oriel
window at first floor level. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the following matters:
▪ The applicant has submitted that various discussions and meetings were held with
Renfrewshire Council's Building Standards Officers who arranged a detailed structural
inspection of the building prior to determining that a Dangerous Building Notice required
to be served. As part of this process, Historic Environment Scotland were also consulted
as a statutory requirement under Section 35(3) of the Buildings (Scotland) Act 2003.
During this process, Historic Environment Scotland requested that a formal application
for listed building consent be submitted. 
Negotiated Improvements
▪ None. 
Site History 
Application No: 19/0029/LB 
Description: Stabilisation works to structure
Decision: Grant 
Consultations

Page 3

Historic Environment Scotland (HES) - No objection. While the demolition is regrettable, it
is in line with the HES guidance on demolitions as it has been demonstrated that reuse is not
economically viable and demolition is now required for safety reasons. HES advise that they
are satisfied that reasonable effort has been taken to save the building and welcome the
intention to salvage masonry and other features from the building. 
West Of Scotland Archaeology Service (WoSAS) - Note that the site is of archaeological
interest and therefore advise that WoSAS is likely to seek a condition requiring
archaeological fieldwork in the event that any subsequent planning application to redevelop
the site is lodged. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
No representations were received.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4
NPF4: Policy 7 - Historic assets and places 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
LDP 2021: Policy ENV3 - Built and Cultural Heritage 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance 
Renfrewshire New Development Supplementary Guidance 2022
▪ Delivering the Environment Strategy: Built Heritage. 
Historic Environment Scotland's Historic Environment Policy for Scotland (HEPS) and
associated "Managing Change in the Historic Environment" guidance note on Demolition of
Listed Buildings. 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
Statement of Justification - Provides a history of the listed building and background to its
subsequent deterioration, noting that since the building was vacated in 2011 efforts to secure
its reuse have been unsuccessful and the condition of the building has in the meantime
declined to a point that required the serving of a Dangerous Building Notice in February
2024. 
The statement summarises the findings of various reports undertaken to assess the
prospects for the building being retained and contains a policy analysis which considers

Page 4

demolition against the four tests identified by Historic Environment Scotland and
Development Plan policy. This analysis concludes that demolition is justified against two of
the four tests, namely that retention is not economically viable; and that retention is essential
for delivering significant benefits for economic growth or the wider community. In reaching
these conclusions, the statement is informed by the following appendices: 
• Appendix A: Structural Inspection Report by Balfour Engineering Consultancy (Rev A -
12/08/2022) - Outlines the results of a structural inspection which found the building to
be in poor condition. Provides a list of remedial measures that would require to be
undertaken for the building to be retained. 
• Appendix B: - Dangerous Building Notice (Issued February 2024) - Notice issued by
Renfrewshire Council's Building Standards service setting out a requirement to make the
building safe either by way of a range of remedial measures or by way of demolition. 
• Appendix C: - Dangerous Building Notice Report (30.01.2024) - Report outlining the
findings of an inspection by Renfrewshire Council's inhouse structural engineer which
informed the issuing of the Dangerous Building Notice. The report concludes that due to
deterioration/dilapidation, a Dangerous Building Notice requires to be served. 
• Appendix D: - Economic Appraisal by Brown & Wallace Construction Consultants (14
April 2023) - Provides an economic analysis of 4 different options for the building,
consisting of: (Option 1) Making the building wind, watertight and structurally stable per
the report by Balfour Engineering Consultancy; (Option 2) Option 1 plus conversion to 5
residential units; (Option 3) Option 1 plus conversion to 3 residential units; and (Option 4)
Full demolition. The analysis concludes that without significant funding or grants from
other sources, the first three options would each result in a substantial financial loss. 
• Appendix E: Conservation Statement by O'DonnellBrown (February 2024) - Provides an
appraisal of the history and architectural significance of the building, concluding that it
was of both special historic and architectural interest. Includes a statement of
significance which identifies features of "considerable significance", "moderate
significance" or "negative significance". 
• Appendix F: Drawing entitled "Demolition Plan. Features to be Retained" (drawing
number: 23079 (DEM) 02, dated 16/02/2024) - Informed by the findings of the
Conservation Statement by O'DonnellBrown, the demolition plan identifies various
architectural features of significance which should be retained for safe keeping for
potential reuse. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment

Page 5

The Town and Country Planning (Listed Buildings and Conservation Areas) (Scotland) 1997
Act states that in considering whether to grant listed building consent for any works, special
regard must be had to the desirability of preserving the listed building or its setting, or any
features of special architectural or historic merit. 
The fourth National Planning Framework (NPF4) provides the long-term national spatial
strategy for planning in Scotland. It sets out the Scottish Government's current view on
delivering sustainable, liveable and productive places through the application of spatial
principles. Policy 7 (Historic Assets and Places) states that demolition of listed buildings will
not be supported unless it has been demonstrated that there are exceptional circumstances
and that all reasonable efforts have been made to retain, reuse and/or adapt the listed
building. Policy ENV 3 (Built and Cultural Heritage) of the Renfrewshire Local Development
Plan is also applicable and presumes against the demolition of listed buildings unless fully
justified. 
Historic Environment Scotland's Historic Environment Policy for Scotland (HEPS) and
associated "Managing Change in the Historic Environment" guidance note on demolitions
also support these principles, with the latter document advising that demolition should only
be approved as a last resort and typically at the end of a process which has considered and
discounted all other feasible options. 
To assess whether the proposed demolition is justified in terms of the above, Historic
Environment Scotland's "Managing Change in the Historic Environment" guidance note on
Demolition of Listed Buildings outlines four tests under which demolition may be established
as acceptable. These four tests are also reflected in Policy 7 of NPF4 and the Renfrewshire
New Development Supplementary Guidance highlighted above. In this regard, demolition
may only be considered acceptable if it is demonstrated that the proposal accords with one
of the following: 
a) The building is not of special interest;
b) The building is incapable of repair;
c) The repair of the building is not economically viable, having been marketed at a price
reflecting its location and condition to potential restoring purchasers for a reasonable
period.
d) The demolition of the building is essential to delivering significant benefits to economic
growth or the wider community; 
Proposals typically only require to satisfy one of the four tests, although Historic Environment
Scotland guidance outlines that exceptions to this may apply. The applicant in their
supporting information has outlined that they consider the proposal to comply with the latter
two of the above four tests. Nevertheless, for the purpose of this report, the four tests are
considered in order, as follows: 
(a) The building is not of special interest
The building was a key landmark on the streetscene and contributed notably to Renfrew's
built heritage. The building was of special historic interest, having been presented circa 1903
to the town by the then provost, William Brown, who was associated with the management of
William Simons' shipyard in Renfrew. 
The building was also of a noted architectural interest in view of its style and features, having
been designed by the Glasgow architect, Alexander McGibbon. The Conservation Statement
submitted with the application highlights a number of features deemed of "considerable
significance", including original stonework; the composition of the front and rear elevations
with original window openings; stonework detailing on the principal elevation including the
round-headed doorway and associated square-headed architrave and fanlight; decorative

Page 6

pilasters and arched window openings; the cupola at roof ridge level; the sculptural panel
above the front door; and the leaded windows. 
In view of the above, demolition of the building would not have passed the first of the four
tests. 
(b) The building is incapable of repair
The structural inspection report advised that the building was in poor condition, noting that
the poor condition of the roof allowed water penetration, whilst the building has also
experienced foundation movement and significant cracking in its side wall, which could be
due to a number of possible factors. The report sets out a list of remedial works that would
be required to allow the building to be retained. Among other measures, these would include:
▪ refurbishment of the roof and potentially the roof structure; 
▪ underpinning to the side elevation followed by "crack stitching" or a partial take down
and rebuild around the large crack on this elevation; 
▪ potential underpinning to some of the internal walls; 
▪ repair or potentially rebuilding of the upper portion of the front elevation around the oriel
window to ensure the whole frontage is stable; 
▪ removal and replacement of all damaged lintols; 
▪ replacement of all windows; 
▪ replacement of all floorboards and potentially floor joists;
▪ removal of all internal wall and ceiling finishes to expose the underlying structure to
establish if further remedial works would then be required. 
In summary, the report considered that the building could be capable of repair and the
demolition would not therefore have passed the second test, albeit the measures required
would be extensive and were recommended by the consultant inspectors without prejudice
to the expense that would potentially be incurred. 
(c) The repair of the building is not economically viable, having been marketed at a
price reflecting its location and condition to potential restoring purchasers for a
reasonable period
In this case, demolition has been undertaken after a period of 13 years during which the
building has been vacant and subject to minimal interest or any offers despite being
marketed for sale or lease. The condition of the building has during this time deteriorated to
a point that resulted in the issuing of a Dangerous Building Notice in February 2024. 
The Notice set out steps to be taken to make the building safe within a three-month period,
either by undertaking necessary works to secure and shore up the building or by
demolishing it. The alternative option of securing and shoring up the building, as set out in
the Dangerous Building Notice, would entail removal of all decayed roof and first floor
timbers, the installation and maintenance of a façade retention system to the front and gable
walls and the installation and maintenance of any propping or shoring of the remaining
structure that may be required. The applicant determined that these works would be
prohibitively expensive such that the retention of the listed building was not economically
viable and the decision was therefore taken to proceed with demolition. 
In considering the economic viability of retaining the building, the applicant's Statement of
Justification draws on the accompanying Economic Appraisal by consultants which provides
a financial comparison of different options for the building. The appraisal outlines an
estimated cost of some £868,700 for making the building wind, watertight and structurally
stable in terms of the works recommended in the structural survey highlighted under (b)
above. The estimated cost of these works compares with the lower cost of £261,900 to
undertake full demolition.

Page 7

The economic appraisal also provides costings for two possible development options after
the necessary repairs have been undertaken, these being the conversion of the building to 5
flats or 3 flats respectively. The option of redevelopment into 5 flats would cost an estimated
£1,731,600, whilst the option of redevelopment into 3 flats would cost an estimated
£1,613,100. When taking into consideration the estimated return that would be made, the
option of conversion to 5 flats would result in an estimated loss of £927,800, while the
conversion to 3 flats would result in an estimated loss of £920,100. In percentage terms,
these two options would result in losses of -98% and -112% respectively. The statement of
justification therefore considers that without substantial funding from other sources, the
retention of the building would be unaffordable. 
The possibility of retaining the front façade of the building to support future potential
redevelopment was also ruled out for several reasons. The Statement of Justification
considers that retention of the façade would have made future development proposals
"impractical, more expensive and less appealing", while it also comments that structural
support would have been required behind the façade which would have required expensive
maintenance. The statement also comments that there were no plans or funding in place for
any such redevelopment, whilst the interim period between initial retention and any future
redevelopment would pose risks in terms of offering an attraction to vandalism or other types
of anti-social behaviour. As such, the statement advises that a strategy of architectural
salvage of important features would be more appropriate than façade retention. 
Given the substantial loss that would be made from making the necessary repairs to safely
retain the building, with or without subsequent redevelopment, it is accepted that retention of
the building was not economically viable. It is also accepted that the retention of the façade
was also not viable given the inevitable financial outlay this would have entailed, together
with the likely measures that would have also been required to ensure its ongoing stability.
As such, the demolition is considered to satisfy the third test regarding economic viability. 
(d) The demolition of the building is essential to delivering significant benefits to
economic growth or the wider community
The statement of justification considers that the demolition of the building is required to
deliver benefits to the community and economic growth, noting in particular that the
Community Council "has consistently expressed support" for demolition for various reasons.
It is stated that these include concerns regarding the condition of the building, soil
subsidence, the substantial cost of redevelopment and lack of economic viability to enable
the restoration of the building. 
The statement of justification also advises that a design team has been commissioned to
prepare development options following demolition which may include new build options for
different potential uses, or landscaped options. It is commented that these options will be
shared with the local community for consultation. Additionally, it is commented that
redevelopment options would seek to commemorate the historical significance of the site
through reuse of architectural salvaged materials, potentially including the sandstone, carved
panels, oriel window sections and the cupola. 
In terms of the above, it is accepted that given the lack of economic viability of retaining the
building and the visual importance of the site at a prominent and historic location, there is
clear community benefit to be gained through demolition and potential redevelopment of the
site. As such, the demolition is considered key to allow any significant benefits to economic
growth or the wider community to be realised and on this basis is considered to pass the
fourth test. 
Summary

Page 8

The listed building was a highly important landmark and of special interest both in terms of
its history and its architectural quality. Its demolition therefore represents a highly regrettable
loss to Renfrew’s heritage. Notwithstanding this, the information accompanying the
application sufficiently demonstrates that the demolition was only undertaken as a last resort
following several years of marketing for reuse and following the deterioration of the building
and eventual issuing of a Dangerous Building Notice requiring intervention within a stipulated
three-month period. 
In assessing whether demolition of a listed building is appropriate, policy refers to four tests,
of which only one requires to be satisfied for the demolition to be considered acceptable. In
this case, the submitted Statement of Justification and its accompanying appendices
satisfactorily demonstrate that retention of the listed building was no longer economically
viable and the demolition was therefore acceptable under the third of the four criteria
highlighted. 
Additionally, it is accepted that the demolition of the building, although extremely regrettable,
offers opportunity for redevelopment of the site which may support the wider community
and/or allow an economically sustainable reuse of the site for the wider benefit of the
surrounding area. As such, the demolition is also acceptable under the fourth test. 
The salvaging of important architectural features and materials which contributed to the
special character of the building also offer opportunity for any future redevelopment of the
site to retain a connection with its past, albeit in a more limited way. It should be noted that
the Council, as landowner, retains control over these elements. 
In view of the foregoing, it is considered that the application has satisfactorily demonstrated
that the building was beyond economically viable conversion, refurbishment or reuse, in
accordance with the relevant policies and guidance highlighted. 
Section 75 Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
It is considered that the application has satisfactorily demonstrated that the building was
unsafe and beyond economically viable conversion, refurbishment or reuse, in accordance
with the relevant policies and guidance highlighted. As such, it is recommended that listed
building consent for the demolition of the building is retrospectively granted. 
Recommendation
Grant subject to conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan.  
Condition(s)         
1. That an inventory of all architectural materials which have been salvaged and retained as
a result of the demolition shall be submitted to the Planning Authority within 3 months of
the date of consent. The inventory shall record details of the location, storage and safe

Page 9

keeping of all items. This record shall be maintained and updated in order that the
relocation or reuse of any items continues to be recorded and the Planning Authority shall
be notified in writing of any such updates to the inventory. 
Reason: In the interests of maintaining a record of all salvaged materials that contributed
to the special interest of the listed building and the potential future reuse and care of
these materials. 
Advisory Note(s) 
None. 
Approved Drawings and Supporting Documents 
Drawing Number Revision Drawing/Document Title
Not numbered  Location Plan – Brown Institute, 41-43
Canal Street, Renfrew  
Statement of Justification for the
Demolition of the Brown Institute, 41-43
Canal Street, Renfrew  
(Appendix A):  Structural Inspection Report
– Brown Institute, 41-43 Canal Street,
Renfrew by Balfour Engineering
Consultancy (Rev A 12/08/2022)  
(Appendix B): Copy of Dangerous Building
Notice issued under Building (Scotland)
Act 2003 issued 08/02/2024 (reference
number: 24/0010/DB)  
(Appendix C): Dangerous/unsafe building
– report by Renfrewshire Council
(30/01/2024)  
(Appendix D): The Brown Institute,
Renfrew – Economic Appraisal by Brown
& Wallace Construction Consultants
(14/04/2023)  
(Appendix E): The Brown Institute
Conservation Statement February 2024 by
O’DonnellBrown
23079 (DEM) 02  (Appendix F): Demolition Plan. Features to
be Retained 
For further information please contact Andrew Mackenzie, Development Standards Team,