Page 1

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 27 August 2024 
Reference No 24/0261/PP
Application Type Planning Permission
Proposal Erection of holiday lodge
Location Site on Northern Boundary of High Linthills
Linthills Road
Lochwinnoch
Ward 9 - Johnstone North, Kilbarchan, Howwood and Lochwinnoch
Community
Council
Lochwinnoch Community Council
Applicant Mr Robert Seaton
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=documents&keyVal=SBGJHZMWGMN00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013.   
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the application would normally fall within
the Council's scheme of delegation to be determined by an appointed officer. However, a
request was submitted by Cllr Andy Doig, Cllr Chris Gilmour and Cllr Gillian Graham, within
21 days of the application appearing on the weekly list, that the matter be removed from the
scheme of delegation for determination by the Board due to the application being viewed as
controversial in the eyes of the local community.   
Proposal
This application seeks planning permission for the erection of a holiday lodge at High
Linthills. Access is via Linthills Road, with the lodge positioned on higher ground above the
road which bounds the site to the south. Proposed parking arrangements include provision
for two spaces adjacent to the site access, and two spaces on the higher ground adjacent to
the lodge. The proposed lodge has a rectangular footprint of approx. 100 square metres
(including the canopy overhang). It incorporates a dual pitched roof which measures 2.65m
in height at the eaves and 4.5m at the ridge. The lodge is clad in cedar cladding with a brick
base course, timber window frames and a slate roof. There is provision for six solar panels
to be fitted to the roof plane on the rear elevation. 
The site layout also includes a container which will be used in connection with the water and
electricity supply to the lodge. The container, which is already positioned at the site, will be
located to the rear of the lodge. It measures 3m in length by 2.4m in width by 2.6m in height.   
Site Description
The site is located at the north western end of Linthills Road and comprises of grassland
with a rocky outcrop towards the north western boundary. The site is currently accessed
from Linthills Road which bounds the site to the south. The southern boundary is defined by
a hedge and trees along the road edge. There are neighbouring residential properties
approx. 35m to the south of the access. To the east the site is bound by a strip of woodland,
with rolling grassland to the north and west.

Page 2

The access track which connects the site to Linthills Road has already been formed, as has
the hard standing area upon which the lodge would be positioned. A post and wire fence has
also been erected along the edge of the access track and the hard standing area, with
conifer trees also planted along the edge of the access track in conjunction with the post and
wire fence.   
It is noted that a holiday lodge was previously approved at this location via appeal
(application ref: 20/0195/PP). For the purposes of this application the lodge is in the same
position as the previous application. It is also of a comparable design and external finish.
However, the footprint of the proposed lodge at 100 sqm is larger than the previous lodge
which was 77 sqm. The ridge line on the proposed lodge is also 0.2m higher than the lodge
approved at appeal.   
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have not taken place in this instance. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant: 
No changes have been negotiated. 
Site History  
Application No: 20/0195/PP 
Description: Erection of holiday lodge
Decision: Refused. Appeal sustained. 
Consultations   
Environment, Housing & Infrastructure (Env. Protection) - No objection subject to
conditions relating to provision of evidence demonstrating capacity within the private water
supply, and the requirement for a site investigation. Advisory notes also recommended with
respect to the private water supply coming under the control of The Water Intended for
Human Consumption (Private Supplies) (Scotland) Regulations 2017 and the requirement to
comply with the requirements of the regulations, and that the property will require a license
to operate as a short term let. 
Chief Executive's Service (Roads Development) – No objection subject to conditions
relating to provision of sightlines of 2.4m x 35m to be provided from the centre of the access
in either direction with no obstruction to visibility above 1.05m above carriageway level, and
that the access shall be constructed to ensure no surface water/ loose chippings are
discharged/ carried out onto the public road. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received: 
Object - 2
Support - 0
Neutral – 0

Page 3

The points of objection raised in the letters can be summarised below. 
1. The previous application was refused on environmental grounds, and included removal
of 6m of woodland over which the applicant had no control.
2. Implementation of the access requires the removal of 10-12 mature trees. These should
be replaced with full standard trees.
3. The proposed access is incomprehensible. The original field track entrance would be
preferable.
4. The lodge now requires 4 parking spaces.
5. The orientation of the lodge requires explanation, with the patio area orientated to face
the excavated rock face.
6. Discrepancy in land ownership.
7. Adequacy of private water supply to serve the proposed development and existing
properties.
8. The reporter did not manage to visit the site for the appeal.
9. There is no landscaping plan or biodiversity plan submitted with the application.
10. Electricity supply is also at capacity.
11. Drainage and issues with surface water run off.
12. Linthills Road is not suitable to serve the development. It is narrow and in poor
condition.
13. If the application is approved it should carry the same conditions as the previous
application, and the application should be passed to the planning committee to
determine. 
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 6 – Forestry, woodland and trees
Policy 8 – Green belts
Policy 14 – Design, quality and place
Policy 20 – Blue and green infrastructure
Policy 22 – Flood risk and water management
Policy 29 – Rural development
Policy 30 - Tourism 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
Policy ENV1 – Green Belt
Policy E4 – Tourism
Policy I3 - Flooding and Drainage
Policy I7 - Zero and Low Carbon Buildings 
New Development Supplementary Guidance

Page 4

Delivering the Environment Strategy – Green Belt and Regional Parks
Delivering the Economic Strategy - Tourism 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
Renfrewshire’s Tourism Plan 2024-2027 
Submitted Reports and Assessments
In assessing and reporting on a planning application the Council is required to provide
details of any report or assessment submitted as set out in Regulation 16, Schedule 2, para
4(c) (i) to (iv) of the Development Management Regulations. 
No reports or assessments were submitted in support of the application. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning
applications to be made in accordance with the Development Plan. Material considerations
applicable to the proposal also require to be taken into consideration, including site history.
As noted above a holiday lodge has previously been granted planning permission at this
location. Planning permission 20/0195/PP was granted via appeal and remains live until
January 2025. 
In assessing the appeal, the appointed reporter concluded that the development does not
conflict with the criteria set out in the supplementary guidance for new tourist facilities, and
for development in the green belt and in the regional park. The development therefore
satisfies the requirements of policies ENV1 and E4 of the LDP. 
In view of the above it is considered that the principle of the proposed development has
been established in accordance with policies ENV1 and E4 and it is not considered
necessary to reassess the principle of the development with regard to these policies. The
key considerations within the assessment are therefore the detailed assessment criteria
within these policies and the associated supplementary guidance, and the relevant policies
within NPF4 which now also form part of the development plan. 
With regard to the green belt development criteria within the new development
supplementary guidance, there will be no loss of prime quality agricultural land or agricultural
land of lesser quality that is locally important. 
There will be no adverse impacts on wild land. 
The proposed access to the site reflects the location of the access approved under the
appeal associated with planning application 20/0195/PP. The Roads Development officer

Page 5

has not objected to the access subject to conditions regarding provision of visibility splays,
and surfacing of the access road to ensure no loose chippings or surface water is
discharged onto the public road. No concerns have been raised with regard to the suitability
of High Linthills Road to accommodate the development. 
The proposed access is positioned to the west of the existing access. The formation of the
new access will include removal of a section of boundary wall and some trees. To ensure
these alterations are implemented sensitively conditions are proposed which would require
compensatory replanting of the trees and reinstatement of the boundary wall where the
original access will be closed up. The net result of the development would therefore be to
move the access slightly to the west. Compensatory planting would also be sought for any
trees that are removed to form the sight lines.   
It is not anticipated that the development would give rise to any significant effects on public
water supply and the water environment from any pollution risk. 
The development will not have a significant impact on any active travel routes or access to
open space, and is linked to the green network via High Linthills Road. 
The lodge will be positioned in the same location as the lodge approved under the appeal
associated with planning application 20/0195/PP. The orientation of the lodge has been
amended so that the canopy overhang is now orientated to the south (as opposed to the
original submission whereby the overhang was orientated to the north). The orientation as
now proposed does not raise any issues with respect to overlooking of the neighbouring
properties given the separation distance between the neighbours to the south and the site,
and the intervening trees and vegetation which form a screen.   
While the building occupies higher ground within the site, it will be screened from view to the
north by the rocky outcrop, and from views to the east by the existing strip of woodland. The
southern boundary of the site is defined by tree and hedge planting which provides some
existing screening to the site as viewed from Linthills Road. Additionally, the proposed timber
design is considered to be suitable to the location.  While the proposed lodge has a slightly
larger footprint in comparison to the previous approval, it is not considered to be of a scale
that will significantly impact local landscape character or visual amenity both individually and
cumulatively. 
Landscaping proposals will be requested via condition. This will include a requirement to
demonstrate biodiversity gain, to compensate for trees that are removed to accommodate
the access, to reinforce the existing boundary treatment where necessary, and to ensure
additional planting and boundary treatments are appropriate. 
Environmental Protection have requested a condition that would require the applicant to
demonstrate that there is capacity within the private water supply to serve the development.
This requirement is also set out within part d) of NPF4 policy 22. 
With regard to other utilities, it is noted that there is an existing container at the site which
would provide the lodge with electricity and water supply. The applicants have advised that
the container will be screened with suitable boundary treatment and planting. This can be
managed via condition. 
For discharge of foul water, the applicants advise that a sewerage tank position has been
excavated, and a new treatment plant will be provided thereafter with treated water
ultimately discharging to a soakaway in an adjacent field. A condition requiring submission of
further details is recommended. It is also noted that this type of foul water treatment system
is regulated by SEPA to prevent pollution.

Page 6

It is not anticipated that there will be a significant detrimental effect on identified nature
conservation interests including species and habitats. It is noted that the hard surface where
the lodge would be located, and the associated access road have already been formed.
There has been no breach of planning control as the existing consent for a lodge at this site
has not lapsed. A row of conifer trees has also been planted along the edge of the access
track. The trees removed to accommodate the access and the visibility splays will be
compensated for via the submission of a landscape strategy for the site. 
In view of the above, it is considered that the development complies with Policy ENV1 and
the green belt development criteria. 
As noted above the development is considered to comply with policy E4 in principle with
regard to the site specific locational need. A holiday lodge has previously been approved in
this location via application 20/0195/PP, and it was noted by the reporter assessing the
appeal that such a development in the Clyde Muirshiel Regional park would be attractive to
tourists. 
The development will complement existing tourist facilities, and strengthen the attraction of
Renfrewshire to a range of visitors. The Lochwinnoch area has several tourist facilities
including those associated with Clyde Muirshiel Regional Park and nearby Castle Semple
Visitor Centre. The proposal will complement these facilities by offering accommodation that
will allow visitors to stay in the area. It is noted that the Council’s Tourism Plan aims to grow
opportunities around outdoor activities, the natural environment, and historic villages. An
outcome of this is to increase the capacity to attract and accommodate visitors. 
The siting, scale and layout of the development is considered to be proportionate to the site. 
Environmental Protection have not raised any concerns with respect to statutory nuisances
such as noise. It is considered that the development would be compatible with surrounding
land uses in this regard. 
With respect to the New Development Supplementary Guidance on tourism developments,
the development will add to the attraction of Renfrewshire as a visitor destination by
providing additional tourist accommodation to complement existing facilities in the area. 
A condition is recommended to ensure the lodge is not occupied on a full time basis as
permanent residential accommodation. This condition was also applied to the appeal
decision for the previous application 20/0195/PP. 
There will not be a significant detrimental impact on visual amenity, the built heritage or
natural heritage interests. 
The design and external finish of the lodge is appropriate for the location. 
The development is compatible with neighbouring land uses. 
There will not be a significant adverse impact on the natural environment, and as noted
above a landscape strategy will be sought via condition to ensure appropriate compensatory
planting and biodiversity gain is delivered at the site. 
The applicant will be required to demonstrate that there is suitable capacity within the private
water supply as per the consultation response from Environmental Protection. Matters
relating to other utility connections have been addressed above.

Page 7

Roads Development have not raised any concerns with respect to the capacity of the road
network to accommodate the development. 
The site connects to active travel routes and the wider green network via High Linthills Road. 
The proposed development has been amended to incorporate solar panels into the design. 
In view of the above it is considered that the development complies with Policy E4 and the
New Development Supplementary Guidance on tourism development. 
As the application site is located within the Clyde Muirshiel Regional Park, it must also be
assessed against the New Development Supplementary Guidance on Regional Parks. 
The relevant guidance indicates that tourism uses will be permitted within the regional park
where they will bring social or economic benefits. While the development is of a small scale
it will contribute to the overall mix of tourism accommodation within the area. The Council’s
Tourism Plan seeks to build capacity in the area for tourism growth, and the development
will contribute towards this objective. 
It is not anticipated that there will be a significant detrimental impact on nature conservation,
landscape character or heritage. The development will not cause significant conflict with
neighbouring land uses with respect to matters which can be controlled by the Planning
Authority.     
The proposed building is appropriate to its surroundings with respect to design and
materials, and there will be no significant impact on the visual amenity of the area. Finally,
the development does not prevent or diminish existing recreational access to the
surrounding area. 
In view of the above, it is considered that the development complies with the relevant
policies and guidance set out within the LDP. 
With regard to NPF4, Policy 8 states that tourism uses will be supported within the green
belt. 
The site-specific locational need for the development has been accepted as per the above
assessment. The purpose of the green belt will not be undermined. The proposal is of an
acceptable scale and external appearance and is compatible with the surrounding landscape
character. There will be no significant long-term impact on the environmental quality of the
green belt. 
Policy 29 states that development proposals that contribute to the viability, sustainability and
diversity of rural communities and the local rural economy will be supported. The
development could bring economic benefit through the provision of tourist accommodation
which would allow tourists to stay in the local area. Though this is unlikely to be significant
given the scale of the development. It is considered that the development is suitably scaled,
sited, and designed to be in keeping with the character of the area.  
Policy 30 states that development proposals for new tourist facilities or accommodation will
be supported in areas identified in the LDP. The proposal is considered to comply with the
LDP as noted in the above assessment. This includes the site-specific locational justification.
Proposals for tourism related development must thereafter take into account a number of
criteria.

Page 8

It is acknowledged that the development could bring economic benefit through the provision
of tourist accommodation which would allow tourists to stay in the local area. 
The nature and scale of the development is compatible with the surrounding area. 
The development will not have a detrimental impact on the local community by hindering the
provision of homes and services. Matters relating to utility supplies have been addressed
above. 
Roads Development have made no objection with regard to parking and traffic generation,
and the suitability of the local road network to accommodate the development. 
The applicant has advised that the proposed lodge complies with disabled ambulant access
provisions. 
The development has been amended to incorporate solar panels into the design. 
The development would improve access to the natural environment by providing tourist
accommodation within the Clyde Muirshiel Regional Park. 
With regard to policies 3 and 6, the developer will be required to compensate for the removal
of the trees to accommodate the site access. The landscape strategy which demonstrates
this compensation shall also require to include a biodiversity strategy to ensure biodiversity
net gain. 
The development is considered to be of an acceptable design and incorporates materials
that are suitable for use at this location. It is acceptable with regard to its impact on the place
as set out within Policy 14. 
The development complies with Policy 20 in that it is compatible with the uses, natural
habitats and character of the regional park. 
Finally with regard to policies 1 and 2 the development is not considered to raise significant
implications with regard to the global climate and nature crisis. Appropriate compensatory
planting and biodiversity gain will be sought as part of the development. Solar panels have
been incorporated into the design of the lodge to reduce the carbon emissions associated
with the development through the generation of renewable energy. 
In view of the above, it is considered that the development complies with NPF4. 
In response to the points raised in the letters of representation. 
1 – The previous application was subsequently granted at appeal. It is considered that
conditions can be used to ensure the environmental impact of the development is mitigated
primarily through compensatory planting of trees that require to be felled to accommodate
the access. 
2 - Replacement trees will be required via condition. 
3 – The proposed access has been approved by Roads Development subject to conditions
relating to sight lines and the surfacing of the access. 
4 – Four car parking spaces have been proposed to ensure the lodge is accessible given the
gradient of the access track. Vehicles can therefore park at the bottom of the access track if
required.

Page 9

5 – The orientation of the lodge is discussed in the foregoing assessment. 
6 – Matters relating to land ownership are a separate legal matter and not material to the
assessment of the planning application. 
7 – A condition will be used to require the developer to demonstrate adequacy within the
private water supply before the lodge can be brought into use. 
8 – The appeal decision notice advises that the reporter did undertake a site inspection. 
9 – Landscaping and biodiversity plans will be sought via condition. 
10 – Capacity within the electricity grid is a matter for the developer to discuss with SPEN
and would not be an impediment to the determination of a planning application. 
11 – Roads Development have requested a condition to ensure that no surface water or
loose chippings are discharged or carried out onto the public road. 
12 – Roads Development have not raised any concern over the suitability of Linthills Road to
accommodate the development. 
13 – The conditions that were attached to the appeal decision would be reapplied in this
instance, and the application will be determined by the Planning and Climate Change Policy
Board.   
Section 75 Obligations
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan 
Condition(s)  
1. That the development hereby approved shall be used as holiday accommodation only,
and shall not be used as permanent residential accommodation. For the purposes of
this condition permanent residential accommodation is defined as occupation by the
same person or persons continuously for more than 28 days, or cumulatively for more
than 84 days in a single calendar year. 
Reason: To define the consent in the interests of protecting the integrity of the Local
Development Plan policies on new housing within the green belt.

Page 10

2. That prior to construction commencing on the structure of the holiday lodge hereby
approved, the developer shall submit a scheme of landscaping for the written approval
of the Planning Authority. The scheme shall include details of existing trees, shrubs, and
hedgerows to be retained (and measures for their protection) and those that are to be
felled; a scheme of tree, shrub and hedge planting and grass seeding and/or turfing
including compensatory planting for any trees and shrubs removed to accommodate the
access and associated visibility splays and planting to screen the existing container on
the site which provides the electricity and water supply for the lodge; measures to
promote biodiversity gain at the site, the phased implementation of the proposed
landscaping, and details of the management and maintenance of landscaped areas.
The scheme thereafter approved shall be implemented on site in accordance with the
phasing plan, and maintained thereafter in accordance with the maintenance details.   
Reason: To ensure a suitable landscape strategy is developed for the site in the
interests of visual amenity and biodiversity. 
3. That prior to construction commencing on the structure of the holiday lodge , the
developer shall submit for the written approval of the Planning Authority a plan showing
the location of all existing boundary walls, fences, gates, and any other method of
enclosure to be retained and those that shall be removed, and the location, design and
finish of all proposed boundary walls, fences, gates, and any other method of enclosure.
The development shall thereafter be undertaken in accordance with the approved plan. 
Reason: To ensure a suitable scheme of boundary treatment is developed for the site in
the interests of visual amenity. 
4. That prior to construction commencing on the structure of the holiday lodge, the
developer shall submit a plan detailing the design of the proposed access for the written
approval of the Planning Authority. The plan shall specify the design of the access, its
geometry, surfacing, a drainage scheme to prevent surface water discharging onto the
public road, any gates and or boundary walls, and the works required to form the
required visibility splays. The approved access shall thereafter be implemented on site
and the visibility splays formed prior to the holiday lodge being brought into use. The
visibility splays shall be maintained thereafter for the life of the development. 
Reason: To ensure a safe access to the site is formed.      
5. That the holiday lodge shall not be occupied or brought into use until the developer
provides evidence for the written approval of the Planning Authority which demonstrates
sufficient capacity in the private water supply to serve the property. 
Reason: To ensure the holiday lodge can be serviced and that water supply to other
properties is not compromised. 
6. That construction of the structure of the holiday lodge hereby approved shall not
commence until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil, water and
gas contamination within the site); and, if remedial works are recommended therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed methods
for implementing all remedial recommendations contained with the site investigation
report prepared in accordance with current authoritative technical guidance, has
been provided by the Planning Authority.

Page 11

Reason: To ensure that the site will be made suitable for its proposed use. 
7. Prior to occupation of the holiday lodge: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; and/or 
b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use shall be
submitted to the Planning Authority and approved in writing. 
Reason: To demonstrate that works required to make the site suitable for use have been
completed. 
8. That prior to construction commencing on the structure of the holiday lodge hereby
approved, the developer shall first provide a specification detailing the design, colour,
and texture of all finishing materials to be used on the lodge and all energy efficiency
measures to be employed within the design and construction of the lodge shall be
submitted for the written approval of the Planning Authority. Only the approved details
shall thereafter be used in the development of the site. 
Reason: To ensure that the proposed finishing materials are suitable for use in the
interests of visual amenity. 
9. That prior to the holiday lodge being occupied or brought into use, the developer shall
submit for the written approval of the Planning Authority a strategy for the management
and disposal of all foul and surface water at the site. The approved strategy shall
thereafter be implemented on site prior to the holiday lodge being occupied or brought
into use, and shall be maintained thereafter for the duration that the lodge is occupied or
in use to the satisfaction of the Planning Authority. 
Reason: To ensure all foul and surface water is managed sustainably in the interests of
pollution control. 
Advisory Note(s) 
1. It should be noted that with the addition of the holiday lodge development to the private
water supply the supply will come under the control of The Water Intended for Human
Consumption (Private Supplies) (Scotland) Regulations 2017 and to comply with the
requirements of the regulations. As such the water supply will require to be sampled and
risk assessed prior to use of the lodge and thereafter on an annual basis with all
associated costs passed to the applicant. 
2. The property will require a license to operate as a short term let. The applicant should
apply to the Licensing section of Renfrewshire Council. More information on this is
available from the council's website. 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
23.259.01 (003) A Site Plan Proposed
23.259.02 (001) A Floor Plan and Elevations
2310979-1 A Impression

Page 12

23.259.01 (002)  Site Plan as Existing
23.259.01 (001)  Location Plan 
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk