Report by Chief Planning Officer
Planning and Climate Change Policy Board: 28 May 2024 
Reference No 24/0153/PP
Application Type Planning Permission-Full
Proposal Erection of up to a 49.9MW Battery Energy Storage System
(BESS)
Location Land Off Barnwell/ Wright Street, Renfrew, PA4 8AN
Ward 02 - Renfrew South And Gallowhill
Community
Council
Renfrew Community Council
Applicant P3P Partners LLP 
Recommendation Refuse
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=S9I8Y9MWFQQ00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure)(Scotland)
Regulations 2013.  
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the proposed development falls within the
'major' category of development as defined by The Town and Country Planning (Hierarchy of
Development) (Scotland) Regulations 2009. 
Proposal
This application seeks planning permission for the erection of up to a 49.9MW Battery
Energy Storage System (BESS) at Wright Street, Renfrew. The BESS comprises of seventy
two battery modules (which each feature 8 individual battery units), six transformers, a client
control building, a substation and an auxiliary transformer. 
Access to the site is via the internal access road that currently serves the Bidfood distribution
depot to the west of the site. This road connects with Barnwell Street to the west of the
stopping up point which splits Barnwell Street from Wright Street. There is a 28m deep
landscape buffer between the edge of the footway on Barnwell Street / Wright Street and the
boundary fence. The buffer features a mix of tree and shrub planting, grass seeding and an
attenuation pond. The control building, substation and auxiliary transformer are grouped
together in the north west corner of the site, with the batteries set out in six groups of twelve
across the remainder of the site. There is an internal access road network, and two car
parking spaces are proposed. 
The submission is accompanied by indicative drawings of the various elements of the
development. The substation measures 7m in width, 6.7m in length and 4m in height. It has
a flat roof and is of a red brick construction. The control building measures 12m in length, 4m
in width and 3m in height. It incorporates a flat roof and is finished green. The individual
battery units are 2.3m in height and 1.3m in length and width and are finished white. The
auxiliary transformer is 1.7m in height, while the BESS transformers are 3.6m in height. 
A 3m high boundary fence is proposed. Native hedge planting will also be incorporated along
the north east and south east boundaries. There is also an additional pocket of tree and
shrub planting in the south east corner of the site. There are eight 5m high CCTV and
lighting columns proposed.

Page 2

Site Description
The application site extends to 1.65 hectares in area. It is bound by Barnwell Street / Wright
Street to the north, Houston's Bottling Plant to the east, a waste water treatment plant to the
south, and Bidfoods distribution depot to the west. Westway Business Park is located on the
opposite side of Barnwell Street / Wright Street to the north. 
The closest residential properties are located on Babcock Drive approx. 50m to the south
east, and Methuen Road approx. 75m to the south east. It is noted that Methuen Drive
occupies an elevated position in relation to the application site. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the following matters:
The proposed development would be contrary to Policy E1. Any application would therefore
require a supporting statement outlining the material considerations which would justify a
proposal that does not comply with the development plan. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant:
▪ The applicant has agreed to upgrade the frontage of the site to provide an additional
section of active travel link to tie in with the works already completed on Barnwell Street
to the west of the site. These upgrades can be secured by an appropriately worded
condition. 
Site History  
Application No: 21/1607/PP 
Description: Erection of boundary fence
Decision: Grant 
Application No: 22/0364/AD 
Description: Display of four non-illuminated fascia signs
Decision: Grant 
Application No: 23/0385/PN 
Description: Proposed Battery Energy Storage System
Decision: Accepted; 
Application No: 24/0162/EA 
Description: Request for screening opinion as to the requirement for an Environmental
Impact Assessment relating to the installation of a 49.9MW Battery Energy
Storage System
Decision: Environmental Assessment not Required 
Application No: 20/0717/PP 
Description: Approval of Matters Specified in conditions 3.4.1 - 3.4.10 (inclusive) and
4.5.8 of Planning Permission 20/0120/PP - Erection of Class 6 (Storage &
Distribution) building with associated access, parking and landscaping.
Decision: Grant subject to conditions
Application No: 20/0120/PP

Page 3

Description: Erection of Class 4 (Business), Class 5 (General Industrial) and Class 6
(Storage & Distribution) development, with associated access, parking and
landscaping (in principle).
Decision: Grant subject to conditions 
Application No: 19/0792/EO 
Description: Request for screening opinion as a requirement for a Environmental Impact
Assessment relating to the erection of class 4 (business), class 5 (general
industrial) and class 6 (storage & distribution) development
Decision: Environmental Assessment not Required 
Application No: 19/0789/NO 
Description: Erection of class 4 (business), class 5 (general industrial) and class 6
(storage & distribution) development
Decision: Accepted; 
Application No: 09/0063/EO 
Description: Request for screening opinion on the need for an Environmental Impact
Assessment for residential development
Decision: Environmental Assessment not Required 
Consultations   
Glasgow Airport Safeguarding - No objection subject to conditions relating to submission
of Bird Hazard Management Plan and that the landscaping and soft water scheme shall be
implemented as shown in the plans and shall not be altered without the prior written consent
of the Planning Authority in consultation with Glasgow Airport Safeguarding. 
Environment, Housing & Infrastructure (Env. Protection) - Noise assessment required.
Conditions relating to land contamination required. 
NATS - No objections 
Chief Executive's Service (Roads Development) – No objection subject to conditions
relating to completion of the Wright St frontage works identified within the red hatching on
Systra Drg 108980/A/GL/01 rev B, formation of a 2m wide footway from the new gates to the
existing footway network including dropped kerb connections, formation of a 3m wide shared
foot and cycleway through the site connecting the Wright St Cycleway to the southeastern
extent of the site for eventual connection to the Renfrew Paisley cycleway, to provide at
traffic free at grade connectivity between Paisley and AMIDS, and formation of a
2.5x30x1.05m sightline at the sites gateway onto Bidfoods existing access road. 
Scottish Power Networks (Transmission Sites) - No comments. 
Scottish Power Networks (Distribution Sites) - No objections. 
Scottish Water - No objections. 
S.E.P.A - Development is below threshold with which site specific advice would be provided. 
Scottish Fire and Rescue Service – No response. 
Representations
The application has been publicised in line with the requirements of the relevant legislation.

Page 4

The following representations were received: 
Object - 6
Support - 0
Neutral - 0 
The issues raised can be summarised as follows: 
▪ Safety and fire risk from thermal runaway. These uses are generally located on the
periphery of populated areas.
▪ Proposal is in an industrial area but creates no permanent jobs. It is not therefore
consistent with Policy E1.
▪ Site is in the flood plain.
▪ Proposal may prevent expansion of neighbouring premises including storage of high
value flammable stock. Houston's bottling plant advise they have plans to expand which
would place them under COMAH regulations, and the proposal may prevent this. They
also advise that existing stock may have to be removed. 
▪ The SEIL should be promoted for similar uses which are compatible with existing uses.
The proposal could have a detrimental impact on the function of the SEIL and would
remove an opportunity site.
▪ The proposed grid connection is 3km away from the site.
▪ An EIA is required.
▪ The public consultation process was not satisfactory with minimal publicity and
communication.
▪ Impact on residential amenity and proximity to residential properties.
▪ Noise and EMF buzzing.
▪ Are there other examples of BESS sites near residential areas.
▪ Chemical composition of the batteries and potential contamination of land and water if
they were to fail. 
▪ Impact on local wildlife.
▪ Impact on road network.
▪ Timeline for construction.
▪ Management of construction vehicles and how will they access the site.
▪ During baseline testing for the noise assessment was construction noise from Westway
omitted.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 11 - Energy
Policy 13 - Sustainable transport
Policy 14 - Design, quality and place

Page 5

Policy 22 - Flood risk and water management
Policy 23 - Health and safety
Policy 26 - Business and industry 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan 
Policy E1 - Renfrewshire's Economic Investment Locations
Policy E2 - City Deal Investment Framework
Policy ENV2 - Natural Heritage
Policy ENV4 - The Water Environment
Policy I1 - Connecting Places
Policy I3 - Flooding and Drainage
Policy I4 - Renewable and Low Carbon Energy Developments 
New Development Supplementary Guidance 
Delivering the Economic Strategy – Economic Investment Locations
Delivering the Environment Strategy – Natural Heritage and the Water Environment
Delivering the Infrastructure Strategy – Connecting Places, Flooding and Drainage and
Renewable and Low Carbon Energy Developments 
Full details relating to the policies of the LDP can be found online. 
Submitted Reports and Assessments
In assessing and reporting on a planning application the Council is required to provide
details of any report or assessment submitted as set out in Regulation 16, Schedule 2, para
4(c) (i) to (iv) of the Development Management Regulations. 
The following reports have been submitted in support of the application, and can be
summarised as follows: 
Flood Risk Assessment – This report notes that the site is located within an area at little to
no risk of flooding from fluvial and coastal sources. There is an area in the centre of the site
at low to medium risk of surface water flooding. A SUDS scheme is proposed which would
discharge surface water to sewer along Wright Street Attenuation is proposed to ensure
greenfield run off rate can be achieved. Infiltration of surface water will be investigated. A
detailed design will be prepared. 
Pre-application Consultation Report - This report outlines the community engagement
undertaken by the applicant during the pre-application consultation period and demonstrates
compliance with statutory requirements.  Consideration has been given to comments
received, and the design and layout of the development has evolved to take specific account
of key environmental considerations and likely issues associated with residential amenity. 
Design and Access Statement – The report provides an appraisal of the site, the
development, and the policy and legislative context around BESS. There is a specific section
related to fire safety which outlines the fire safety measures ranging from initial testing and
manufacturing of the batteries to on site safety and fire risk mitigation. In terms of policy the
statement asserts that the development meets the tests of Policy E1 in respect of
development outside classes 4, 5 and 6 being deemed acceptable. 
Transport Statement – The statement advises that all construction and maintenance vehicles
will access the site via the new bridge crossing with the construction period lasting up to

Page 6

eight months. The report states that there will be negligible trip generation during the
operational period and concludes that there will be no significant impact upon the public road
network. 
Preliminary Ecological Appraisal – The report notes that there is a negligible risk of adverse
impacts to statutory designated sites within 5km of the development. The site is assessed as
being an open mosaic habitat on previously developed land, and has high conservation
value as a UKBAP Priority Habitat. Further surveys are recommended with respect to
vertebrates, botanicals, bats, nesting birds (should works take place within the main
breeding season) and mitigation measures to ensure a quantifiable increase in biodiversity
include planting of native species rich hedgerow, creation of a suds feature, enhancement of
existing habitats, and tree planting. Site offers low potential to support badgers and otters.   
Noise Impact Assessment – This report notes that the proposed development is unlikely to
give rise to significant adverse noise impacts at the nearest noise sensitive receptors, and
will not disrupt existing residential amenity. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment 
The application site is located within the Advanced Manufacturing and Innovation District
Scotland (AMIDS) strategic economic investment location (SEIL). Policy E1 of the Local
Development Plan (LDP) states that economic investment locations are identified and
promoted for the development of Class 4 Business, Class 5 General Industry and Class 6
Storage and Distribution uses, along with support for a wider range of employment
generating uses. 
Proposals for employment generating uses not listed in classes 4, 5 or 6 require to
demonstrate the resultant economic impact of the proposed development, and that the
proposals would not have a significant detrimental impact on the role and function of the
economic investment location, the visibility of the network of centres, transport infrastructure
and the built and natural environment. 
Policy 26 of National Planning Framework 4 (NPF4) states that development proposals for
business and industry uses on sites allocated for those uses in the LDP will be supported.
Other employment uses will be supported where they will not prejudice the primary function
of the area and are compatible with the business/industrial character of the area. 
It should be noted that the application site has planning permission in principle for class 4, 5
and 6 development via application 20/0120/PP. It is also noted that while the site has lain
vacant for over ten years the infrastructure to serve the site has recently been improved
through the completion of the bridge crossing at Barnwell Street (see planning application
17/0485/PP) which connects the site with the rest of the AMIDS campus and Glasgow
Airport.

Page 7

The proposed BESS development does not fall within classes 4, 5 and 6 and is not
considered to be a significant employment generating use with respect to its operation. The
operational phase only requires intermittent maintenance visits. 
The applicant has sought to demonstrate that the development would still bring economic
benefit through job opportunities created during the construction phase (a peak of up to 20
construction staff is anticipated), opportunities within the supply chain, and through the
contribution towards provision of a more secure, stable, lower carbon and lower cost energy
supply which could stimulate investment in other business sectors. It is also stated that
continued investment in the renewable energy and battery storage sector will contribute to
the growth of this industry and to increased employment opportunities in this specific field.    
In this instance the development does not fall within classes 4, 5 or 6. For the purposes of
policies E1 of the LDP and 26 of NPF4 employment generating uses are generally
considered to be those which result in direct employment creation at the site during the
operational phase.   While the potential economic benefits associated with the development
as noted above are acknowledged, it is considered that the development is not an
employment generating use as it does not create employment opportunities at the site during
the operational phase. 
It is noted that policy E1 also refers to ancillary service provision. However, in this instance
the BESS would be connected to the national grid and not directly to any of the businesses
within the SEIL. It cannot therefore be considered as ancillary service provision. 
In view of the above, while there is some economic benefit associated with the development
it is, on balance, considered to be contrary in principle to policies E1 of the LDP and 26 of
NPF4. 
In addition to the above it is noted that Policy E2 of the LDP seeks to support development
proposals which ensure the anticipated economic benefits of the city deal investment
framework are fully realised. 
As noted above the city deal investment framework includes the new bridge crossing over
the White Cart Water which enhances accessibility to the application site. The new bridge
crossing means that vehicles can access the site without going via Wright Street. It should
be noted that for the purposes of the LDP the SEIL boundary was extended to include this
site specifically following the city deal investment. For the purposes of LDP 2014 the site
was located within a transition area. 
It is considered that if the site is not developed for an employment generating use in
accordance with Policy E1 of the LDP then the economic benefits associated with the city
deal investment will not be fully realised. The development is also therefore considered to be
contrary to Policy E2 of the LDP.   
Policy 1 of NPF4 states that when considering all development proposals significant weight
will be given to the global climate and nature crises. Policy 2 of NPF4 aims to encourage,
promote, and facilitate development that minimises emissions and adapts to the current and
future impacts of climate change. 
BESS developments support the transition to a low carbon electricity network by importing
and exporting large amounts of electricity with no time lag. This helps to balance
transmission requirements as any excess energy generated from renewable sources can be
stored at times of excess supply and then transmitted at times of excess demand.

Page 8

The transition to a low carbon electricity network will help to address the global climate crisis.
As the development will help facilitate this transition, it is considered to comply with Policies
1 and 2 of NPF4. 
Policy 11 of NPF4 goes on to state that development proposals for all forms of renewable,
low-carbon and zero emissions technologies will be supported. These include energy
storage such as batteries. 
The net economic impact of the development including local employment and opportunities
within the supply chain has been outlined above. 
There is no detrimental impact on international or national designations as set out in the
supporting ecological appraisal. 
In terms of potential impact on neighbouring residential properties at Babcock Crescent and
Methuen Road, the Environmental Protection Team have approved the accompanying Noise
Impact Assessment. It is therefore considered that the development will not have a
significant detrimental impact on residential amenity with respect to noise. 
There are no air quality issues associated with the operation of the development. 
With respect to visual impact, the development will be partly screened from residential
properties and Houston's Bottling Plant. The development also incorporates landscaping
along the north eastern, south eastern, and south western boundaries which will contribute
to screening the site over time as the landscaping matures. 
It is noted that the development will be most visible to the properties on Methuen Drive as
these properties are on ground which is elevated above the level of the site. On balance it is
however not considered that the nature of the development is significantly out of keeping
with the character and appearance of Barnwell Street which is an established industrial and
commercial location. There are not considered to be significant landscape or visual impacts
associated with the development. 
It is noted that the representations which have been received raise concern over potential
impact on residential amenity arising from health and safety matters such as fire risk in
addition to contamination and pollution. 
Concerns raised in relation to fire risk are not sufficient reason to justify refusal of a planning
application, and there are no laws that specifically govern the fire safety of BESS. Individual
batteries may have to adhere to product safety regulations however control over this would
fall outwith the remit of the planning system. In this instance, the applicant has provided a
response to the concerns around fire risk, noting that the batteries undergo testing at the
manufacturing stage and incorporate layers of fire check resilience. This includes a fire
suppression system, continuous monitoring of the batteries, and appropriate spacing. The
applicant has also agreed to the submission of a Fire Safety Management Plan via an
appropriately worded planning condition should planning consent be granted. On this basis,
it is considered that the applicant could suitably address fire risk. 
In view of the above, it is considered that the development complies with Policy 23 of NPF4
which seeks to protect people and places from environmental harm. 
With respect to pollution risk, SEPA have advised that the development falls below the
energy generation consultation trigger within which they would provide specific advice on the
planning application. Attention is drawn to SEPA’s standing advice on the regulatory
requirements and regulatory guidelines which could apply to the operation of the

Page 9

development. This includes matters such as pollution prevention. It is the developer’s
responsibility to ensure the development operates in compliance with the relevant
requirements and guidelines. For the purposes of the planning application a pollution
prevention plan could be incorporated into a condition relating to the management of the
construction phase should planning consent be granted.   
There is no impact on public access, walking or cycling routes. 
There have been no objections from NATS or Glasgow Airport Safeguarding with respect to
aviation interests. It is noted that Glasgow Airport Safeguarding have approved the
landscaping and soft water strategies, and have requested a Bird Hazard Management Plan
which can be submitted via condition should planning consent be granted. 
It is not anticipated that there will be any detrimental impact on telecommunications or
broadcasting installations. 
The Roads Development Officer has offered no objections to the development with respect
to potential impact on road traffic. An appropriately worded planning condition could be used
to ensure construction and operational traffic access the site via the new bridge crossing
(and not via Wright Street) in accordance with the Transport Statement. 
It is noted that the development will not generate significant trips during the operational
phase. However, notwithstanding this the applicant has agreed to upgrade the frontage of
the site to deliver a gap in cycle infrastructure along Barnwell Street / Wright Street. Further
details of the upgrade works could be requested via an appropriately worded planning
condition, as could matters in relation to the visibility splay at the site access and connecting
the site access with the pedestrian network. The request to form a 3m wide active travel
route through the site to connect Barnwell Street with the Paisley-Renfrew core path is not
considered to be reasonable as the completion of this connection relies on third party land,
and a connection between Wright Street and the core path is being delivered as part of the
development on Babcock Drive. 
In view of the above it is considered that the development complies with Policies 13 of NPF4
and I1 of the LDP. 
There are no impacts on any historic environment assets. 
The application site is not at risk from coastal or river flooding. The applicant has presented
an acceptable outline strategy with respect to the sustainable management of surface water.
A detailed strategy can be submitted via condition. There is not considered to be a significant
pollution risk associated with the development as noted above. It is considered that the
development complies with Policies 22 of NPF4 and I3 of the LDP with respect to flooding
and drainage and Policy ENV4 of the LDP regarding the water environment. 
The ecological status of the site is outlined within the Ecological Appraisal. Whilst the site is
brownfield it has been naturalised, and is considered to constitute an open mosaic habitat on
previously developed land which has high conservation value as a UKBAP Priority Habitat. 
While this classification should not prevent regeneration of the brownfield site in principle,
the biodiversity value of the site should still be considered in accordance with Policies 3 and
9 of NPF4. 
In this instance, the Ecology Appraisal makes recommendations as to how biodiversity gain
can be delivered at the site. This includes the grass, hedgerow and tree planting and the
surface water strategy as set out in the landscape scheme. It is considered that the appraisal

Page 10

sets out a suitable approach, however a specific Biodiversity Enhancement Plan is required
to quantify the biodiversity gain. This could be submitted via an appropriately worded
planning condition. 
The Ecology Appraisal does not anticipate any significant impact on protected species,
however pre-development checks are recommended with respect to vertebrates, botanicals,
bats, nesting birds. An appropriately worded planning condition could be used to ensure
these checks are undertaken. 
The development will not result in the loss of any trees or areas of woodland. As noted
above the landscape strategy includes two areas of tree planting at the north east frontage
and south west corner of the site. 
In view of the above I am satisfied the development complies with Policies 3 and 9 of NPF4
and ENV2 of the LDP. 
In terms of decommissioning, a strategy could be sought via condition. This would require
the need for a bond to ensure sufficient funds are available and that the Council could call
upon these funds if required.     
The overall contribution to greenhouse gas emission reduction and renewable energy
generation associated with the development is acknowledged, and there are no significant
detrimental impacts with respect to the environment, residential amenity, or landscape. The
development is therefore considered to comply with Policy 11 of NPF4. 
Policy I4 of the LDP and the associated new development supplementary guidance states
that renewable and low carbon energy developments will be supported in principle where
they are appropriate in terms of the location, sitting and design having regard to cumulative
effects. 
Matters relating to the local environment, landscape character, built and natural heritage,
water environment, amenity of neighbouring properties, visual amenity, transport
infrastructure and the safe and efficient use of Glasgow airport have been addressed above. 
Regarding cumulative effects, it is noted that a screening opinion has been submitted for a
BESS at the waste water treatment works to the south east of the site however an
application has not been received. There are no concerns at this time over cumulative
impact in this regard. 
The development will not have a detrimental impact on outdoor sport or recreation interest. 
Policy I4 of the LDP requires all major development planning applications to consider the
feasibility of connecting to a heat network. The nature of the proposed development means it
stores excess energy and releases this to the grid at times of need, resulting in a more
secure and stable network of energy within the grid. As it does not generate electricity and
simply stores then releases it, it is not possible to connect to a heat network. The efficiency
of the batteries being proposed also results in less heat being generated, in turn, resulting in
less power being lost, greater efficiency and increased safety. 
The site selection process has been driven by the potential for a grid connection at
Braehead Park Substation. The applicant therefore sought approx. 5 acres of brownfield
land within a commercially viable radius. Several sites were identified and after considering
the constraints the land at Barnwell Street was selected as the best option. The reasons for
this included the brownfield location within an industrial area, background noise, and no

Page 11

flooding, ecological or natural/built heritage constraints. The planning statement advises that
the opportunity to develop on a brownfield site is rare. 
In view of the above it is considered that the development complies with Policy I4 of the LDP. 
Policy 14 of NPF4 seeks to encourage, promote, and facilitate well designed development
that makes successful places. The development will re-use a vacant brownfield site. The
incorporation of a scheme of landscaping, which includes a 28m deep landscape buffer
between the edge of the footway on Barnwell Street / Wright Street and the site boundary
fence, will ensure the site is suitably screened. 
The submission specifies an indicative finishing colour for the various elements of the
development. This includes green for the buildings, and white for the battery units. The
colour of the boundary fence has not been specified. The finishing colour for all components
of the development including the boundary treatment could be submitted via condition. It is
considered that the overall appearance of the site is likely to be commensurate with the
industrial character at the western end of Barnwell Street, and that the visual impact will be
softened over time as the boundary landscaping matures. On this basis it is considered that
the development complies with Policy 14 of NPF4. 
In terms of the representations received, the points raised are addressed as follows: 
Safety and fire risk from thermal runaway. These uses are generally located on the periphery
of populated areas.
Matters relating to safety and fire risk have been addressed in the foregoing assessment. 
Proposal is in an industrial area but creates no permanent jobs. It is not therefore consistent
with Policy E1.
Matters relating to compliance with Policy E1 have been addressed in the foregoing
assessment. 
Site is in the flood plain.
SEPA have confirmed that the site is not within the fluvial and coastal flood risk area. Matters
relating to surface water flooding are a matter for the Council to consider. An acceptable
outline strategy for the sustainable drainage of surface water has been included. 
Proposal may prevent expansion of neighbouring premises including storage of high value
flammable stock. Houston's bottling plant advise they have plans to expand which would
place them under COMAH regulations, and the proposal may prevent this. They also advise
that existing stock may have to be removed. 
Ultimately an intention to expand cannot be afforded significant weight as the expansion may
not take place. Additionally, there is no definitive indication that the presence of a BESS
would ultimately prevent the neighbouring property from expanding. The representation
refers to expanding to the point where a COMAH designation is applicable however it is
possible that the residential properties to the south east could also be a prohibiting factor to
an expansion of this nature. 
The SEIL should be promoted for similar uses which are compatible with existing uses. The
proposal could have a detrimental impact on the function of the SEIL and would remove an
opportunity site.
Noted. The proposed development is considered to be contrary to the development plan. It
would result in the loss of a site which is safeguarded for business and industry and
employment generating uses while failing to deliver new jobs as intended by the City Deal
investment. This would not be in line with the identified role and function of the SEIL.

Page 12

The proposed grid connection is 3km away from the site.
Grid connection is ultimately a matter for the developer to consider and should not be an
impediment to the grant of planning permission.   
An EIA is required.
The requirement for an EIA has been screened out via application 24/0162/EA. 
The public consultation process was not satisfactory with minimal publicity and
communication.
The public consultation process was undertaken in accordance with the requirements of the
relevant legislation. 
Impact on residential amenity and proximity to residential properties.
Potential impact on residential amenity has been addressed in the foregoing assessment. 
Noise and EMF buzzing.
The Environmental Protection Team have approved the Noise Impact Assessment, and on
this basis it has been demonstrated that the development will not have a detrimental impact
on the amenity of residential properties with regards to noise. 
Are there other examples of BESS sites near residential areas.
Each application must be assessed on its own merits. 
Chemical composition of the batteries and potential contamination of land and water if they
were to fail.
Matters relating to pollution and potential contamination have been addressed in the
foregoing assessment.  
Impact on local wildlife.
Matters relating to ecology and protected species have been addressed in the foregoing
assessment. 
Impact on road network.
The impact of the development on the road network has been addressed in the foregoing
assessment. It is noted again that the proposed access to the site for construction and
operational vehicles follows the new crossing over the White Cart Water and on this basis,
vehicles should not be trying to access the site via Wright Street.   
Timeline for construction.
The supporting information sets out an indicative 8 month construction phase. Should
planning permission be granted the developer would have up to three years to commence
the development. 
Management of construction vehicles and how will they access the site.
It is noted again that the proposed access to the site for construction and operational
vehicles follows the new crossing over the White Cart Water and on this basis, vehicles
should not be trying to access the site via Wright Street.   
During baseline testing for the noise assessment was construction noise from Westway
omitted.
The scope, methodology and conclusions within the Noise Impact Assessment have been
approved by the Environmental Protection Team 
Section 75 Obligations

Page 13

The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None. 
Conclusion
The development is not considered to comply in principle with Policies 26 of NPF4 and E1
and E2 of the LDP. It is not a development that falls within classes 4, 5 or 6, an airport
related use, ancillary service provision, or some other employment generating use with
respect to jobs being created directly at the site during the operational phase. The
supporting information submitted with the application does not demonstrate that the proposal
is an employment generating use with respect to the aspirations for the AMIDS SEIL. 
The AMIDS SEIL is identified as a key location to support innovation in manufacturing across
Scotland. The application site was included as part of the AMIDS SEIL in the LDP to
maximise the benefits associated with the City Deal infrastructure investment which sought
to stimulate economic investment and make a significant contribution to the Renfrewshire
economy and sustainable and inclusive economic growth including increased employment in
line with Policy E2. The proposal although making a contribution to delivering a low carbon
and net zero economic recovery would not be in accordance with the LDP in that it would
result in the loss of a site which is safeguarded for business and industry and employment
generating uses while failing to deliver new jobs as intended by the City Deal investment and
it would not be in line with the identified role and function of the SEIL. 
In the above assessment it is recognised there is support for the development in respect to
Policies 1, 2 and 11 of NPF4 and I4 of the LDP. Compliance with Policy 1 of NPF4 in terms
of tackling the climate crisis is noted in particular. However, while the development complies
with policy 11 of NPF4 the overall contribution to renewable energy generation targets and
on greenhouse gas emission reduction targets must be taken into consideration. The
proposed BESS would have a 49.9MW generating capacity which is not of the same scale
and contribution as other BESS sites (both approved and proposed) within the Council area
(namely 21/0034/PP and 24/0052/EB both at Gleniffer Road).   
On balance and taking the above assessment into consideration it is considered that greater
weight should be afforded to Policies E1 and E2 of the LDP and 26 of NPF4 with respect to
appropriate uses for the site. The proposal is contrary to these policies and that of the site's
designated purpose within the local development plan. While compliance with Policies 1, 2
and 11 of NPF4 and I4 of the LDP is noted this is not considered to outweigh the provisions
of Pe2olicies E1 and E2 of the LDP and 26 of NPF4. It is therefore recommended that the
application is refused for the reasons outlined below.   
Recommendation
Refuse 
Reason(s) for Recommendation 
1. The proposal does not fall within Class 4 Business, Class 5 General Industrial or
Class 6 Storage and Distribution, is not an airport related use or ancillary service
provision, and is not an employment generating use. It is therefore contrary to
Policy 26 of National Planning Framework 4, Policy E1 of the adopted
Renfrewshire Local Development Plan, and the associated New Development
Supplementary Guidance on Delivering the Economic Strategy which seek to
identify and promote Class 4 Business, Class 5 General Industrial and Class 6
Storage and Distribution development, airport related use or ancillary service

Page 14

provision, and other employment generating uses within Renfrewshire's
Economic Investment Locations. 
2. The proposal would not result in anticipated economic benefits associated with
the delivery of Renfrewshire's City Deal infrastructure projects (as set out in
Figure 4 of the Renfrewshire Local Development Plan) from being fully realised
as it will not generate increased employment at a designated development
opportunity site located within the City Deal Investment Framework. It is
therefore contrary to Policy E2 of the adopted Renfrewshire Local Development
Plan and the associated New Development Supplementary Guidance on
Delivering the Economic Strategy. 
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
13015-0002-03   Site Location Plan
13015-0003-03  Existing Site Plan
13015-0005-02  Indicative Site Sections Plan
13015-0006-01  Indicative Proposed Site Elevations
13015-0007-01  Indicative DNO Substation Plans and
Elevations
13015-0008-02  Indicative Client Control Building Plan and
Elevations
13015-0009-01  Indicative CATL Battery Plan and
Elevations
13015-0010-01  Indicative MV TX Plan and Elevations
13015-0011-01  Indicative PCS Plan and Elevations
13015-0012-01  Indicative Auxiliary TX Plan and Elevations
13015-0013-01  Indicative Lighting Column Plan and
Elevations
13015-0015-02  Indicative Proposed Site Plan with
Landscape Shown
13015-RPS-XX-EX-RP-L-9005  Landscape Management Plan
13015-RPS-XX-EX-DR-L-9001 02 Soft Landscape Proposals: Strategy
13015-RPS-XX-EX-DR-L-9002 02 Soft Landscape: Detailed Proposals 01/03
13015-RPS-XX-EX-DR-L-9003 02 Soft Landscape: Detailed Proposals 02/03
13015-RPS-XX-EX-DR-L-9004 02 Soft Landscape: Detailed Proposals 03/03
04028 001 P3P Renfrew BESS Noise Impact
Assessment
ECO03308 3 Preliminary Ecological Appraisal
PLN-NPI-NP13015-TRP 01c Renfrew BESS Transport Statement and
Construction Traffic Management
Measures
NP13015  Planning, Design and Access Statement
NP13015 1 Pre-Application Consultation Report
HLEF04029 2 Flood Risk Assessment and Conceptual
Surface Water Drainage Strategy 
For further information please contact James Weir, Development Standards Team, Email:
james.weir@renfrewshire.gov.uk.