Page 1

Report by Chief Planning Officer
Planning and Climate Change Policy Board: 28 May 2024 
Reference No 23/0738/PP
Application Type Planning Permission-Full
Proposal Construction of vehicular access and associated works
Location Torrance House, Erskine Harbour, Erskine
Ward 12 - Erskine and Inchinnan
Community
Council
Erskine Community Council
Applicant CWP Erskine Ltd
Recommendation Grant subject to conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=S5VCUIMWM8300 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure)(Scotland)
Regulations 2013
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, a request was submitted by Cllrs
Nicolson, Shaw and Airlie-Nicolson, within 21 days of the application appearing on the
weekly list, requesting that the matter be removed from the scheme of delegation for
determination by the Board. It was considered by the aforementioned members that the
application as it stands is incomplete with regards to meeting active travel policies and could
if determined in isolation, and not considered along with footways and crossing points,
create a significant issue for road safety given that the A726 in that area has had road
fatalities in the past. 
Proposal
This application seeks planning permission for the formation of a vehicular access from the
Barholm Roundabout into an area of vacant land at Erskine Riverfront which has the benefit
of planning permission in principle (PPiP), for residential development (20/0246/PP). 
This access point into the site, was part of the proposal for the PPiP and was considered
acceptable at the Communities, Housing and Planning Policy Board in January 2022. During
the assessment of that application the access was fully considered and planning permission
in principle granted on the basis that vehicular access would be taken from the Barholm
Roundabout. 
This application seeks to obtain detailed planning consent for the access to be formed from
the roundabout to demonstrate certainty to the market that access to the site has approval to
be taken at this point and allow an Approval of Matters Specified in Conditions (AMSC)
application to be brought forward to develop the wider site  for residential development. In
this regard the applicant advises of advanced discussions with a housebuilder which centres
on the landowner being able to demonstrate appropriate access to the site can be obtained. 
The plans submitted indicate a proposed access road with two lanes to afford separate
ingress and egress from the roundabout divided by a small triangle of land, before forming a
two-way section of road to form the vehicular access. The access would extend to
approximately 35 metres in length, with a splay of approximately 41 metres. Given the
topography of the existing landscaped bund the access would be set down within
landscaped verges to afford a suitable tie in with existing road levels.

Page 2

Excavation works would result in the loss of eight trees and a Tree Survey has been
submitted in support of the application to categorise the trees in terms of their quality and
value and to minimise unnecessary impact to the retained population. 
Site Description
The site is located to the northwest of Erskine Town Centre and adjacent to the Barholm
Roundabout on the A726. 
The application site extends to approximately 0.16 hectares. It is part of a larger site which
extends to approximately 1.55 hectares which has planning permission in principle for
residential development (20/0246/PP). 
The site is currently vacant with remnants of its previous development (Torrance House
office block) and has a well-defined mature landscaped edge on its northern, southern, and
eastern boundaries which is comprised of a mix of mature trees and shrubs on top of an
earth bund. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the relationship between this
proposal and the extant planning consent for the wider site, the location and design of the
access road and potential impact on trees. 
Negotiated Improvements
Following submission, the following changes have been negotiated between officers and the
applicant: 
No changes have been negotiated. However, it should be noted that a previous application
for the proposed development was withdrawn (23/0586/PP)  in order to move the proposed
access slightly further east to minimise tree loss. 
Site History 
Application No: 23/0586/PP 
Description: Construction of vehicular access and associated works
Decision: Withdrawn 
Application No: 20/0246/PP 
Description: Erection of residential development (in principle).
Decision: Grant subject to conditions 
Consultations   
Bishopton Community Council - Object on the basis of inadequate school capacity should
the site be developed. 
S.E.P.A - No comments. 
Environment, Housing & Infrastructure (Env. Protection) – No objection.

Page 3

Chief Executive's Service (Roads Development) - No objection subject to a suspensive
condition which would prohibit works starting until wider details and permissions are
forthcoming and granted for the wider site, including pedestrian access, and turning. 
West of Scotland Archaeology Service - No objection. 
Representations 
The application has been publicised in the Paisley and Renfrewshire Gazette in line with the
requirements of the relevant legislation. 
No representations were received.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises.
Policy 2 - Climate mitigation and adaptation
Policy 3 – Biodiversity
Policy 4 - Natural places
Policy 6 - Forestry, woodland and trees
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 13 - Sustainable transport
Policy 18 - Infrastructure first 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan 
Policy E3 - Transition Areas
Policy ENV2 - Natural Heritage
Policy I1 - Connecting Places 
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
New Development Supplementary Guidance
Delivering the Environmental Strategy - Trees, Woodland and Forestry 
Delivering the Infrastructure Strategy - Connecting Places 
Renfrewshire Planning & Development Tree Policy 
Submitted Reports and Assessments
In assessing and reporting on a planning application the Council is required to provide
details of any report or assessment submitted as set out in Regulation 16, Schedule 2, para
4(c) (i) to (iv) of the Development Management Regulations.

Page 4

The following reports have been submitted in support of the application, and can be
summarised as follows: 
Arboricultural Survey to British Standard 5837 (2012) - September 2023 – The submitted
tree survey forms part of the development design process, recording the trees in their
current context.  The aims of the survey are to categorise the trees as to their suitability for
retention in terms of their quality and value and to minimise unnecessary impact to the
retained tree population. The proposed development would affect two groups of trees, G4
which is made up of Larch and Birch and G5 which comprises Larch, Birch and Hawthorn.
The trees are of moderate/good condition. Eight of the trees from the G4 grouping would
require to be removed. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017. 
None. 
Planning Assessment
Section 25 of the Town and Country Planning (Scotland) Act requires decisions on planning
applications to be made in accordance with the Development Plan unless material
considerations indicate otherwise. The Development Plan comprises the National Planning
Framework 4 (2023) (NPF4) and the adopted Renfrewshire Local Development Plan (2021)
(LDP). 
Policy 1 of NPF4 states that when considering all development proposals significant weight
will be given to the global climate and nature crises. Policy 2 of NPF4 aims to encourage,
promote, and facilitate development that minimises emissions and adapts to the current and
future impacts of climate change. 
Policy 13 of NPF4 seeks to encourage, promote, and facilitate development that prioritises
walking, wheeling, cycling and public transport for everyday travel and to reduce the need to
travel sustainably.  It considers that LDP's should prioritise locations for future development
that can be accessed by sustainable modes. 
Policy 18 of NPF4 seeks to encourage, promote, and facilitate an infrastructure first
approach which puts infrastructure considerations at the heart of placemaking. 
In line with these policies, the application site is designated within the LDP as being within a
Transition Area under Policy E3, which supports a mix of developments including residential.
In addition, the application site is subject of an extant PPiP for residential development,
where roads infrastructure, connectivity, and access to other modes of transport was
considered acceptable in principle subject to conditions to control the detail of any
development as it comes forward through the submission of an AMSC application. 
Policy E3 supports a range of uses if they can co-exist with existing surrounding
development, having no significant impact on the character or amenity of the surrounding
area including avoiding any adverse impact on the integrity of any Natura 2000 site.

Page 5

Given that the application site has the benefit of planning permission in principle for
residential development, including an access point from the Barholm Roundabout
(20/0246/PP), it is recognised that the principle of the access proposed has been accepted
(Communities, Housing and Planning Policy Board on 18 January 2022). It is therefore
considered that the proposed development meets the requirements of NPF4 Policies 13 and
18, Policy E3 and that of the associated New Development Supplementary Guidance. 
The principle of the proposal, in association with redeveloping a vacant previously used site,
would also be in line with Policy 9 and the Spatial Strategy outlined in the Adopted
Renfrewshire Local Development Plan, which seeks to ensure that brownfield land in
Renfrewshire's existing places is used before greenfield land or greenbelt. 
The main issues for consideration relate to the detailed design of the proposal, its timing and
specifically to its impact on the surrounding roads network, the physical aspects of the site
including trees/ natural environment and potential impacts on the Inner Clyde SPA located
some 225 metres to the north and east of the site. 
Roads Development has offered no objection to the proposal and agree that in recognition of
the active travel and connectivity requirements of the larger site, including provision of
adequate footways and crossing points, this proposal could be controlled by condition to
ensure that the access subject of this application is not formed until such time as the AMSC
application has been approved and that the vehicular access would be formed in the same
way as that required for any approved AMSC application to ensure appropriate footpath
connections and crossing points are put in place 
Policy I1 'Connecting Places states that all development proposals require to ensure
appropriate provision and accessibility including the ability to connect to active travel
networks, public transport networks and hubs. These requirements would be considered
through any AMSC application for the wider site. Notwithstanding this, conditions attached to
the PPiP (20/0246/PP) require details of a signalised pedestrian and cycle crossing along
with pedestrian access and footway/cycleway links to and from the development to the River
Clyde Walkway, Erskine Town Centre, Bargarran Centre along with routes to St John
Bosco/Bargarran Primary Schools and Park Mains High School should an AMSC application
come forward to develop the approved housing site. 
Turning to impacts on trees and the natural environment, Policy 3 of NPF4 seeks to protect
biodiversity, deliver positive effects from development, and strengthen nature networks.  It
considers that proposals for local development will include appropriate measures to
conserve, restore and enhance biodiversity in accordance with national and local guidance
and should be proportionate to the nature and scale of the development. Policy ENV 2 of the
LDP requires development proposals to, amongst others, consider potential impacts on
natural heritage and minimise any adverse impacts on habitats, special network connectivity
or landscape character. 
Policy 6 of NPF4 and ENV2 of the LDP and the Council's Planning, and Development Tree
Policy seek to ensure that due consideration is given to the safeguarding of trees as part of
any development.   Policy 4 of NPF4 Natural Places seeks to ensure that development
proposals which by virtue of type, location or scale will have an unacceptable impact on the
natural environment, will not be supported. 
Through the previous PPiP, impacts on trees and the natural environment of the site were
considered as was the proximity to the Inner Clyde SPA. Due mainly to the previous uses on
the site, it was assessed as having low potential to support protected species and a low level
of environmental impact from the development.

Page 6

Relevant conditions were applied to the consent relative to landscaping and construction out
with the Redshank Bird Breeding season.  These requirements were imposed based on
distances from the SPA. The application site in this instance is outwith the distance where
mitigation would be required. 
A Tree Survey submitted as part of this application which formed part of the design process
for the access, categorises the trees as to their suitability for retention in terms of their
quality and value and has sought to minimise unnecessary impact to the retained tree
population demonstrating the constraints and opportunities available in positioning of
building and other work activity. 
The access proposed would require the removal of eight trees from the site. These trees are
contained within two groupings of Larch and Birch and Larch, Birch and Hawthorn and vary
from being in moderate to good condition. These tree groupings are large and contain
between 14 and 20 trees each. Eight trees would be lost in consequence of the application
proposal but most of the trees would be retained within these groups enabling the
continuation of tree cover along most of the site boundary. A condition attached to any grant
of planning permission could require additional planting to ensure that the access properly
assimilates into the landscape. The continued maintenance and landscaping of the
residential site would be considered through any application for matters specified in
condition associated with the PPiP.   
It is considered that the proposal suitably complies with the policies outlined above. 
Bishopton Community Council have objected to the proposal on the basis that it is an
enabler for the development of housing, which, if developed, would exert undue pressure on
surrounding schools which are oversubscribed and exist in a differing climate to that which
existed when PPiP, for the larger site was granted. 
In light of the above it is noted that the application is a stand-alone application which seeks
planning permission for the creation of an access road into a currently vacant site. The
development proposed is acceptable in this location and suitably complies with the
requirements of the development plan. Any requirements relative to educational provision
would be considered through the submission of any AMSC application. 
Concerns raised by local members and Roads Development are noted and it is recognised
that this development should not come forward in isolation. Should planning permission be
granted a suspensive condition has been attached to ensure the vehicular is not formed until
an application is approved to develop the wider site that has consent in principle for housing.
The suspensive condition would ensure that the design of the vehicular access would be
such that it would meet that required for any approved development for the wider site in
terms of footpath/active travel connections and crossing points and it would be required to
have the same design as that approved for the wider site. 
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted. 
Section 75 Obligations 
The Council is required to provide a summary of the terms of any planning obligation which
is required to be entered into under Section 75 of the Town and Country Planning (Scotland)
Act in relation to the grant of permission for the proposed development: 
None.

Page 7

Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions. 
Recommendation
Grant subject to conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)          
1. The development hereby permitted has until 18/01/2025 to commence. For the
avoidance of doubt no work shall commence until the terms of condition 2 below
are formally discharged in writing by the Council as Planning Authority. 
Reason: To reflect the timescale of the planning permission in principle for the            
site. 
2. The vehicular access hereby approved shall not be commenced until an
application for approval of matters specified in conditions has been approved for
the wider site under planning application 20/0246/PP, unless otherwise agreed in
writing with the Council as Planning Authority. Thereafter the approved vehicular
access shall be formed in a manner that is exactly in line to the vehicular access
approved under the application for approval of matters specified in conditions for
the wider site.   
Reason: To ensure provision of an access, appropriate for the wider site and to
control the timing of the development.
3.        That before any development commences details of measures, which conform to
BS5837:2012 "Trees in Relation to Design, Demolition and Construction" to
protect all retained trees on site during construction works, shall be submitted for
the written approval of the Planning Authority.  Thereafter, the approved scheme
shall be implemented prior to work commencing on site and shall be maintained
in place until the development is completed.
Reason: In the interests of the amenity of the area and to afford adequate
protection to the trees.
4.     That before any development of the site commences a scheme of landscaping
shall be submitted to and approved in writing by the Planning Authority ; the
scheme shall include:- (a)  details of any earth moulding and hard landscaping,
grass seeding and turfing;  (b)  a scheme of tree and shrub planting,
incorporating details of the number, variety and size of trees and shrubs to be
planted;  (c)  an indication of all existing trees and hedgerows, plus details of
those to be retained, and measures for their protection in the course of
development, and  (d)  details of the phasing of these works;  
Reason:  In the interests of the visual amenity of the area.

Page 8

5.     That within 6 months of the development hereby permitted being completed, (or
within the next available planting season), all planting, seeding turfing and earth
moulding included in the scheme of landscaping and planting, approved under
the terms of condition 4 above, shall be completed; and any trees, shrubs, or
areas of grass which die, are removed, damaged, or diseased within 5 years of
the completion of the development, shall be replaced in the next planting season
with others of a similar size and species;  
Reason:  In the interests of amenity.
Schedule of Plans Determined 
Drawing Number Revision Drawing/Document Title
DR-C-001 P00 Site Location Plan
DR-C-001 P00 Proposed Junction Layout, Levels and
Construction Details  
Torrance House Tree Protection Plan
DR-C-001 P01 Planning Layout
DR-C-002 P00 Proposed Kerbing Layout and Detail
DR-C-005 P00 Existing and Proposed Layout Comparison
(Tree Removal)  
Torrance House, Erskine Arboricultural
Survey dated 25 September 2023 
For further information please contact Clare Murray, Development Standards Team, Email:
clare.murray@renfrewshire.gov.uk.