Democracy Spraffa

Agenda Document Pack - Planning and Climate Change Policy Board - 19/03/2024

Renfrewshire Council · 19 March 2024
Back to Planning and Climate Change Policy Board — 19 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Some pages contain no extractable text. They may be blank, graphics or scanned pages. OCR has not been applied.

Page 1

Notice of Meeting and Agenda
Planning and Climate Change Policy Board 
Date Time  Venue
Tuesday, 19 March 2024 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Jim Paterson (Convener):     Councillor Bruce MacFarlane (Depute
Convener):    
Councillor Jennifer Adam:  Councillor Alison  Ann-Dowling:  Councillor Andy Doig: 
Councillor Chris Gilmour:  Councillor Neill Graham:  Councillor Anne Hannigan: 
Councillor Kenny MacLaren:  Councillor Jamie McGuire:  Councillor Marie McGurk: 
Councillor John McNaughtan:  Councillor Iain Nicolson:  Councillor John Shaw: 
Councillor Ben Smith:   
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk

Page 2

Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting. 
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

Apologies 
Apologies from members. 
Declarations of Interest and Transparency Statements 
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement. 
Finance 
1 Revenue and Capital Budget Monitoring Report 
Joint report by Chief Executive and Director of Finance &
Resources. 
1 - 6 
Climate Change 
2 Renfrewshire Biodiversity Duty Report 2021/23 
Report by Chief Executive. 
7 - 28 
3 Consultation on Heat in Buildings Bill 
Report by Director of Environment, Housing & Infrastructure. 
29 - 40 
Development Management 
4 Tree Preservation Order Requests 
Report by Chief Executive. 
41 - 44 
5 Section 75 Agreements - Update 
Report by Chief Executive. 
45 - 50 
6 Site Development Brief – Paisley Grammar School 
Report by Chief Executive. 
51 - 64

Page 4

7  Developer Contributions (Education) - new planning
guidance 
Report by Chief Executive. 
65 - 86 
8 Local Development Plan 3 Progress Update and Local
Place Plans 
Report by Chief Executive. 
87 - 92 
9 Planning Applications 
Reports by Chief Executive. 
9(a)  22/0569/PP - Approval of Matters specified in
Conditions 2, 4 and 6 of planning permission in
principle approval 18/0638/PP, for the erection of a
residential development comprising 180
dwellinghouses at land At Junction 29, St James
Interchange, Ferguslie Park (bound by Ferguslie Park
Avenue, existing Railway) byJ29 (Scotland) Ltd c/o AS
Homes Scotland Ltd 205 St Vincent St Glasgow G2
5QD way by 
93 - 110 
9(b)  22/0574/PP - Erection of a residential development
comprising 45 flats with associated access, parking
and landscaping at site between Abbeyfield House And
Ivy Gardens Station Road Paisley by Springfield
Properties PLC Ramoyle House Glenbervie Business
Centre Larbert FK5 4RB 
111 - 122 
9(c)  23/0296/PP - Formation of car park with associated
access and landscaping and realignment of boundary
wall at India of Inchinnan Greenock Road Inchinnan by
City Gate Construction Ltd Unit 3 Imperial Park West
Avenue Linwood PA1 2FB 
123 - 132 
9(d)  24/0025/LB - Realignment of front boundary wall at
India of Inchinnan Greenock Road Inchinnan by City
Gate Construction Unit 3 Imperial Park West Avenue
Linwood PA1 2FB 
133 - 138

Page 5

No embedded text on this page.

Page 6

No embedded text on this page.

Page 7

To: Planning and Climate Change Policy Board
On: 19 March 2024
Report by:  Chief Executive and Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring as at 5 January 2024
1. Summary of Financial Position
1.1. The projected revenue outturn at 31 March 2024 for those services reporting
to the Planning and Climate Change Policy Board is an overspend position of
£0.033 million (5.3%). 
1.2. This is summarised in the table below and further analysis is provided in the
Appendices. 
1.3. There are no capital projects reporting to the Planning and Climate Change
Policy Board. 
2. Recommendations
2.1. Members are requested to:
(a) Note the projected revenue outturn position in Table 1 above; and  
(b) Note the budget adjustments detailed at section 4. 
3. Revenue
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
overspend of £0.033 million (5.3% of total budget) for all services reporting to
Table 1
Revised
Annual
Budget
£000
Projected
Annual
Outturn
£000
Budget
Variance
(Adv) / Fav
£000
Budget
Variance 
%
Planning Services 625 658 (33) (5.3)
Item 1
PACC190324 Page 1 of 138

Page 8

this Policy Board.  Detailed division service reports can also be found here,
together with an explanation of any significant projected variances.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to the Board.
3.3. The main reasons for the projected outturn position are indicated below the
tables showing both the subjective analysis (what the budget is spent on) and
the objective analysis (which division is spending the budget).
3.4. The projected overspend position reflects the net effect of two main factors,
being a projected under-recovery in fee income (see 3.5), offset by a
projected underspend in employee costs due to the expected impact of staff
turnover over the course of the financial year. 
3.5. Due to the very demand-led nature of the income stream, which is impacted
by the economic and financial climate, the level of Planning and Building
Standards income can vary over the course of the financial year, which can
make it challenging to determine trends for income projection. The
projections, at the end of the third quarter of the financial year, currently
indicate an expected over-recovery in Planning fees and an under-recovery in
Building Standards fees and reflect a reasonable forecast at this stage in the
financial year.
4. Revenue Budget Adjustments
4.1. No budget adjustments have been processed since the previous report to
board. 
__________________________________________________________________
Implications of this report 
1.  Financial – The projected budget outturn position for the revenue budget
reported to the Planning and Climate Change Board is an overspend of
£0.033 million. Income and expenditure will continue to be monitored
closely for the rest of the financial year and any changes to current
projections in Revenue budgets will be reported to the board as early as
possible, along with an explanation for the movement.
2.  HR and Organisational Development 
None directly arising from this report.
3. Community/Council Planning
None directly arising from this report.
4.  Legal 
None directly arising from this report.
Page 2 of 138

Page 9

5.  Property/Assets 
None directly arising from this report.
6.  Information Technology 
None directly arising from this report.
7.  Equality and Human Rights 
None directly arising from this report.
8. Health and Safety
None directly arising from this report.
9. Procurement 
None directly arising from this report.
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive
and Directors.
11. Privacy Impact
None directly arising from this report.
12. 
13.
Cosla Policy Position 
N/a.
Climate Risk
None directly arising from this report.
__________________________________________________________________
List of Background Papers: None
__________________________________________________________________ 
Author: Valerie Howie, Finance Business Partner
Page 3 of 138

Page 10

Appendix 1   
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Planning Strategy & Place 557 3 560 508 52 9.3% 36 16
Development Management 234 (3) 231 85 146 63.2% 149 (3)
Building Standards (166) 0 (166) 65 (231) (139.2%) (220) (11)
NET EXPENDITURE 625 0 625 658 (33) (5.3%) (35) 2
Objective Heading Key Reasons for Projected Variance
Planning Strategy & Place
Development Management
Building Standards
The projected underspend is mainly as a result of a higher than expected level of staff turnover over the course of the
financial year.
The projected underspend relates mainly to a projected over-recovery in Planning fee income (c. 11.0% of targeted
income).
The projected overspend relates mainly to a projected under-recovery in Building Standards fee income (c. 26.5% of
targeted income).
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 5 January 2024
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  PLANNING SERVICES
Page 4 of 138

Page 11

Appendix 1   
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 1,637 3 1,640 1,485 155 9.5% 163 (8)
Premises Related 1 0 1 1 0 0.0% 0 0
Transport Related 15 0 15 15 0 0.0% 0 0
Supplies and Services 180 0 180 182 (2) (1.1%) (2) 0
Transfer Payments 102 0 102 88 14 13.7% 1 13
Support Services 317 0 317 317 0 0.0% 0 0
GROSS EXPENDITURE 2,252 3 2,255 2,088 167 7.4% 162 5
Income (1,627) (3) (1,630) (1,430) (200) (12.3%) (197) (3)
NET EXPENDITURE 625 0 625 658 (33) (5.3%) (35) 2
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 5 January 2024
POLICY BOARD :  PLANNING SERVICES
Page 5 of 138

Page 12

Page 6 of 138

Page 13

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 19 March 2024
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Renfrewshire Biodiversity Duty Report 2021 - 2023  
___________________________________________________________________ 
1. Summary 
1.1 The purpose of this report is to inform the Planning and Climate Change
Policy Board of the Renfrewshire Biodiversity Duty Report for 2021-2023. 
The report has been prepared in accordance with the Council’s statutory
duties as set out in the Wildlife and Nature Conservation (Scotland) Act 2011.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the Renfrewshire Council Biodiversity Duty Report 2021 –
2023. 
(ii) Notes that, subject to Board approval, the report will be published on
the Renfrewshire Council website in accordance with statutory
requirements. 
3. Background 
3.1. The Nature Conservation (Scotland) Act 2004 gives all public bodies a duty to
further the conservation of biodiversity while exercising their functions. This
duty was reinforced by provisions included in the Wildlife and Nature
Conservation (Scotland) 2011, which requires public bodies to publish a report
every three years on the actions undertaken to meet biodiversity duties.   
Item 2
PACC190324 Page 7 of 138

Page 14

3.2. Renfrewshire Council published its third Renfrewshire Biodiversity Duty
Report covering the period 2018 to 2020 in January 2021.  In accordance with
statutory requirements, this fourth Renfrewshire Biodiversity Duty Report has
been prepared to highlight the actions undertaken by the Council to support
biodiversity over the period 2021-2023.   
4. Renfrewshire Council Biodiversity Duty Report 2021 - 2023 
4.1. The Council continues to make good progress in enhancing biodiversity
particularly through embedding biodiversity considerations in strategic policy
documents such as the Renfrewshire Local Development Plan and
Renfrewshire’s Plan for Net Zero.  This has been supported by a range of
partners and stakeholders who have assisted in the delivery of a variety of
biodiversity activities over the period.   
4.2. The Biodiversity Duty Report 2021-2023 highlights that an important
achievement during this period has been the variety of biodiversity activities
and nature based solutions which contribute positively towards Renfrewshire’s
Plan for Net Zero and the Renfrewshire Biodiversity Action Plan.  This
includes landscape scale projects such as the creation of new woodland
habitats and peatland restoration to the creation of biodiversity areas and local
conservation activities. 
4.3. The Council will continue to support biodiversity through implementation of the
actions set out in the suite of strategic policy documents such as the
Renfrewshire Local Development Plan, Renfrewshire Biodiversity Action Plan
and Renfrewshire Plan for Net Zero.  
__________________________________________________________________
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community Planning – None. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  
Page 8 of 138

Page 15

If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Climate Change – this report summarises work which the Council has
completed which will contribute positively towards achieving Renfrewshire’s
Plan for Net Zero.
________________________________________________________________ 
Appendix 1 
Renfrewshire Council Biodiversity Duty Report 2021 - 2023 
List of Background Papers 
(a)  None. 
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk Tel: 07483 136235 
Page 9 of 138

Page 16

1
Renfrewshire Council
Biodiversity Duty Report  2023
Page 10 of 138

Page 17

2
Introduction
Biodiversity in Renfrewshire
Actions to Protect and Enhance Biodiversity
Mainstreaming
Nature-Based solutions, Climate Change and Biodiversity
Funding for Community Projects
Public Engagement and Staff Development
Research and Monitoring
Biodiversity Highlights and Challenges
Contents
4
5
6
9
11
12
15
16
Page 11 of 138

Page 18

33
The term ‘Biodiversity’ is
short for biological diversity. 
It includes every plant and animal,  including the
range of habitats on which all flora and fauna
depend.
Page 12 of 138

Page 19

4
Introduction
The Nature Conservation (Scotland) Act
2004 gives public bodies a duty to further the
conservation of biodiversity.  The Wildlife and
Nature Conservation (Scotland) Act 2011 requires
public bodies to publish a report every three years
on the actions undertaken to meet biodiversity
duty. 
 
This report highlights the actions undertaken
by Renfrewshire Council to support biodiversity
over the period 2021-2023 and is the fourth
Biodiversity Duty Report produced by the Council. 
In July 2023 the Scottish Government amended
its advice to public bodies and provided a revised
template, setting out the main areas that it
considers important for public bodies to include
in their Biodiversity Duty Reports.  This report
follows the Scottish Government template. 
4Page 13 of 138

Page 20

5
1.  Biodiversity in Renfrewshire
Renfrewshire covers an area of some 270 square kilometres (102 square miles) and
on 30 June 2021 had an estimated population of around 179,940 people.
The natural character and biodiversity of Renfrewshire is a valuable asset, providing
the basis for many social and economic activities of direct benefit to the local
community.  Renfrewshire Council provides a range of services which seeks to
support and enhance biodiversity conservation in this context.  These include:
The Economy & Development team within the Chief Executive’s
Service guides the use of land and its development, along
with the maintenance and enhancement of high quality places
within Renfrewshire, through the Local Development Plan and
Development Management functions.
Environment, Housing & Infrastructure Services manage urban
parks, cemeteries, Gleniffer Braes Country Park, parts of Clyde
Muirshiel Regional Park and open spaces.
Children’s Services promote environmental education through
schools, encouraging children to become more conscious of
biodiversity conservation and other sustainability issues.
The Council seeks to positively use, manage and maintain its land assets to
support and enhance biodiversity conservation.  This relates particularly to
habitats and species prioritised on the Scottish Biodiversity List and these form
the framework of the Renfrewshire Biodiversity Action Plan 2028-2022, which
the Council co-ordinates on behalf of around 40 local biodiversity partner
organisations.
5Page 14 of 138

Page 21

6
2: Actions to Protect and Enhance Biodiversity
As in previous reporting periods, Renfrewshire Council has continued to protect and improve biodiversity, as well as connecting people with nature, through direct
action and a series of innovative partnership projects, as summarised below.
Section 2: Actions to Protect and Enhance Biodiversity
Ref. No. Action Inputs/Outputs Outcomes
2.1 Creation of Biodiversity Areas in
Renfrewshire
Annual allocations (from 2021/22) of Scottish Government
Nature Restoration Fund grant-aid supported biodiversity
improvements on 19 cut grassland sites, with a further 11
sites approved by the Infrastructure, Land & Environment
Policy Board on 30 August 2023.
Greenspaces transformed from intensively managed
grassland to create biodiversity areas
https://storymaps.arcgis.com/
stories/86b7ab224cce402f8f8e3fa2434c0ac4  
2.2 Implementation of Muirshiel
Country Park Woodland
Management Plan 2016-2025
Maintenance of around 4000 native trees by volunteers,
including Scots pine, aspen, silver birch, downy birch,
common alder, hazel, rowan and oak. 
Removal of Sitka spruce saplings to protect an area of
blanket bog at the edge of the Country Park and beside the
surrounding moorland.
• Involvement of volunteers directly in conserving priority          
habitats.
• Increased area of Scottish Biodiversity List priority
habitats: Upland Birchwood, Upland Oakwood, Lowland
Mixed Deciduous Woodland. Enhancement of upland
blanket bog  (Scottish Biodiversity List priority habitat).
2.3 Cample Burn Juniper
Conservation Project in Clyde
Muirshiel Regional Park.
Maintenance of 750 planted juniper, aspen and eared
willow carried out with Clyde Muirshiel Regional Park
volunteers.
The planted trees are contributing to an enhanced upland
habitat and are an example of a local rewilding project.
2.4 Support for Castle Semple
Volunteer Group.
In 2021/23 Clyde Muirshiel staff organised a programme of
activities to support conservation work at Castle Semple
and Muirshiel.
Group delivered 6,166 hours of voluntary biodiversity
conservation work on tree planting, rhododendron and
Himalayan balsam removal, hedge maintenance, litter
removal and wildflower garden work.
Page 15 of 138

Page 22

7
Section 2: Actions to Protect and Enhance Biodiversity - Continued
Ref. No. Action Inputs/Outputs Outcomes
2.5 Clyde Muirshiel Regional Park staff
managing conservation volunteers
Supervised volunteering hours:
2020/21     951
2021/22     1,778
2022/23    3,437
Volunteers provide equivalent to one FTE member of staff
working on important habitat improvements.
2.6 Volunteers at Gleniffer Braes
Country Park led by on-site staff
from Council’s Environment,
Housing & Infrastructure Services.
Supervised volunteering hours:
2021      86
2022     162
2023     132
Rhododendrons controlled, hedgerows managed, litter
lifted, trees planted,  sensory garden restored, bug hotels
constructed and erected, scrub managed, pond planting,
access improved and ditches cleared.
2.7 Peatland conservation works. Renfrewshire Council helped Butterfly Conservation
Scotland’s Bog Squad to return to Sergeantlaw Moss in
Gleniffer Braes Country Park to control invasive scrub early
in 2024, providing Licence to Occupy for the project, help to
promote the events and onsite guidance.
Lowland Raised Bog (a Scottish Biodiversity List priority
habitat) conserved at the edge of Paisley.
More volunteers actively involved in biodiversity
conservation work.
2.8 Glasgow & Clyde Valley Green
Network Partnership
Renfrewshire Council continued to liaise with the GCVGNP
team at a City Region level to produce mapping resources
designed to show opportunity areas for expanding the
extent of Species Rich Grassland and then Wetlands.
Outputs and recommendations for future action could
provide the opportunity to link locally valuable habitats into
nature networks both within Renfrewshire across a wider
framework provided by the Glasgow City Region.
Page 16 of 138

Page 23

8
Section 2: Actions to Protect and Enhance Biodiversity - Continued
Ref. No. Action Inputs/Outputs Outcomes
2.9 Planned Dargavel Community
Woodland Park
Following previous multi-agency guidance coordinated by
Renfrewshire Council, BAE Systems’ Dargavel Park Strategic
Plan was approved by Renfrewshire Council in November
2021. The first phase – Formakin Link 1 - had been approved
in June 2018. This has been delivered and includes a ‘wildlife
area’, as per the approved plans.  Proposals for Formakin Link
2 were approved in May 2021 and are being progressed by
BAE Systems. 
The negotiations leading up to the Strategic Plan have
clarified priorities for future conservation management, to
ensure benefits for biodiversity and future site users are
maximised.
People living in the new community are already enjoying
the biodiversity aspects of the attractive landscapes
surrounding their homes.
2.10 Brownside Braes Lesser
Whitethroat Conservation Project
Delivery of Partnership project between Renfrewshire
Council, Paisley Natural History Society and Trees for Cities
had created new area of scrub woodland to attract nesting
Lesser Whitethroats.
1,300 trees planted to special design over 7.9ha will
increase CO2 sequestration by up to 55 tonnes per year.
Direct community involvement in practical action.
2.11 Creation of Lowland Mixed
Deciduous Woodland habitat at
Barwood Park, Erskine
Delivery of Partnership project between Renfrewshire
Council, Clyde Climate Forest and Trees for Cities has
created new area of native woodland in an urban park.
1,050 trees planted to link existing isolated trees to create
small woodland of 2,000 m2. Direct community involvement
in practical action.
Page 17 of 138

Page 24

9
3: Mainstreaming
Renfrewshire Council has continued to make good progress in mainstreaming biodiversity duties into core activities and has taken several opportunities to integrate
biodiversity conservation into corporate projects, plans and strategies. 
Section 3: Mainstreaming Biodiversity
Ref. No. Action Inputs/Outputs Outcomes
3.1 Council plays lead role in
developing, supporting and
implementing the Renfrewshire
Biodiversity Action Plan process
• Outcomes of the 2018-2022 Biodiversity Action Plan
reviewed and discussed with local biodiversity partners
during meetings.
• Biodiversity Action Plan for 2023-2027 discussed with
partners and drafted, with proposed submission to Council’s
Planning and Climate Change Board in spring 2024.
• Officer time provided to coordinate implementation of the
Biodiversity Action Plan throughout reporting period.
• Nearly 40 partner organisations actively supporting joint
biodiversity conservation action locally.
• Provides framework for Council’s development
management functions.
• Resources shared for priority habitats biodiversity
conservation projects .
• Improved levels of public awareness of biodiversity
conservation in Renfrewshire.
3.2 Renfrewshire Local Development
Plan 2021
• Policy ENV 2 provides protection and encourages
enhancement of a variety of features which make up
Renfrewshire’s natural heritage.
• The Spatial Strategy for Places recognises the importance
of enhancing and strengthening the Green Network by
preparing and delivering a Green Network Strategy.
• Biodiversity continues to be protected through the
Council’s planning policy and processes. 
•    Biodiversity enhancement is supported and encouraged.
• Locally significant Sites of Importance for Nature
Conservation (SINCs) illustrated on the Development Plan’s
area maps, along with other environmental and natural
heritage designations.
3.3 Renfrewshire Vacant and Derelict
Land Strategy (2022)
• Encourages nature positive places that will be more
resilient to the impacts of the climate crisis and support the
recover and restoration of our natural environment.
• Action Plan commits the Council to engage with local
communities regarding the future use of small sites not
recorded on the vacant land register and work in partnership
to identify sites which may be suitable for greening, growing,
planting or biodiversity opportunities.
Renfrewshire Council endorses a naturalising approach
to regenerating vacant and derelict land, as such sites
sometimes develop interesting plant and animal populations
with deliberate human intervention.
Page 18 of 138

Page 25

10
Section 3: Mainstreaming Biodiversity  - Continued
Ref. No. Action Inputs/Outputs Outcomes
3.4 Sustainable Procurement
Programme
Award from Renfrewshire Council’s Climate Change
Action Fund enabled the Corporate Procurement Unit to
develop a monitoring and recording framework supporting
assessment of the climate change impacts of contracts
and run training events for local businesses about climate
change and sustainability.
Increased awareness of biodiversity in business sectors.
3.5 Grant funding to local groups from
Renfrewshire Council funding
sources
During this three-year period, Renfrewshire Council
operated a series of competitive grant funds supporting
communities to develop and deliver local projects, many
of which had a focus on improving the environment and
biodiversity.  This included a Community Climate Fund and
a Parks & Greenspaces Fund.  
•   The Community Climate Fund supporteda range of
projects including Lochwinnoch Sustainable Community
Garden to propagate and plant out wildflower seeds,
Kirklandneuk Primary school to create a biodiversity area
in the school grounds, a biodiversity garden at Ferguslie
Cricket Club and biodiversity improvements by the
Sculpture House Collective in its Community Dye Garden,
Ferguslie Park, Paisley.
•  The Greenspaces Fund supported the Friends of Jenny’s
Well LNR to restore and maintain access paths so that
more people in Paisley can enjoy biodiversity.
•  Lochwinnoch Force for Nature were funded via planning
gain to acquire Swift nest boxes for erection on local
buildings.
Page 19 of 138

Page 26

11
4: Nature-Based solutions, Climate Change and Biodiversity
Renfrewshire Council has continued to make good progress in developing and implementing a positive response to the Climate Emergency which it declared on
27 June 2019, committing to making Renfrewshire carbon neutral by 2030. This response recognises the potential role of biodiversity in achieving the carbon
neutrality target and includes nature-based solutions.
Section 4: Nature-Based Solutions, Climate Change and Biodiversity
Ref. No. Action Inputs/Outputs Outcomes
4.1 Renfrewshire Local
Development Plan
2021
Policy 13 (Flooding and Drainage) recognises the importance of the
management of flood risk through natural flood management and green
infrastructure within the context of a flood management scheme.  It also
states that flood measures should have a positive effect on the water
environment as well as the natural heritage interests of the site and land
surrounding the site. 
Additional habitats potentially created as a result of flood
management initiatives.
4.2 Renfrewshire’s Plan
for Net Zero
•  Plan approved and published in August 2022.
•  Under the “Resilient Place” theme, the plan identifies the Priority Area
of “helping nature locally”. In addition, the Plan commits to identifying
appropriate locations and measures to increase carbon storage and
biodiversity on public land assets, e.g. restoration of peat bogs; greening
public spaces; and wild flowering instead of using lawnmowers on verges.
Increased awareness of issues amongst elected members,
managers and officers.
4.3 Peatland Restoration
project proposals
at Queenside Muir,
West Tandlemuir Farm
in the Renfrewshire
Heights SPA (Special
Protection Area).
Working in partnership with NatureScot, proposals to restore water levels
on 216ha of blanket bog have been developed to planning application
stage, with a view towards a NatureScot funding application and
implementation in autumn 2024.
•  Estimated that  556 tonnes of Carbon Dioxide per year
will be sequestered by restored peatland habitat.
•  Enhanced habitat for biodiversity conservation, including
Hen Harriers.
•  Improved flood management, silt wash-out and water
quality along the River Calder.
4.4 Candren Burn
Feasibility Study,
Ferguslie Park, Paisley.
Working in partnership with SEPA, delivery of a feasibility study to consider
opportunities around the deculverting and re-naturalisation of the Candren
Burn, Ferguslie Park, Paisley as part of ’The Making of Ferguslie’, a local plan
for the neighbourhood.  RIBA 0-1 feasibility stage to be progressed during
spring 2024, supported by SEPA’s Water Environment  Fund.
•  Increased awareness of potential benefits amongst
various Council services, statutory agencies and
community representatives. Liaison mechanism
established.
•  Technical Working Group actively supporting project.
Page 20 of 138

Page 27

12
5: Public Engagement and Staff Development
Renfrewshire Council has continued to deploy resources to promote biodiversity conservation throughout its communities and worked with partners to maximise
the benefits of these efforts. New technologies have been used where appropriate to reach wider audiences and have become an important feature of staff
training and networking activities.
Section 5: Public Engagement and Workforce Development
Ref. No. Action Inputs/Outputs Outcomes
5.1 Co-ordination of the LBAP
Steering Group for
Renfrewshire, East
Renfrewshire and  Inverclyde
•  8 meetings chaired between 2021 and 2023, with Renfrewshire
Council also performing the secretarial role.
•  Information sharing by email of national newsletters, funding
opportunities, networking events, etc. coordinated by Renfrewshire
Council.
•  The number of represented groups increased from 35 to 38 over the
reporting period.
•  Emerging draft of updated Renfrewshire
Biodiversity Action Plan.
•  Regular liaison resulted in practical conservation
works on the ground in Renfrewshire.
•  Joint ventures undertaken, with partners receiving
funding support from the Council.
5.2 Renfrewshire Growing
Grounds Forum (coordinated
by Renfrewshire Council and
Renfrewshire Health & Social
Care Partnership)
•  7 meetings held to maintain peer information exchange function.
•  Regular email communications between meetings, to disperse relevant
information about funding, etc.
•  Allotment site managers incorporating biodiversity
features, e.g. ponds, orchards, wild areas, beehives,
bug hotels, wild flower planting projects, schools
work.
•  Closer links between biodiversity conservation
and health promotion activities.
5.3 Renfrewshire Council website
and associated social media
channels
•  Renfrewshire Council website updated and biodiversity pages
expanded to report conservation projects, places to enjoy biodiversity
and interactive map of designated sites.
•  ArcGIS StoryMap on Biodiversity Areas project launched on the
Council website.
•  Social media channels have been used for consultation purposes, e.g.
for the Biodiversity Action Plan.
Increased awareness of Renfrewshire’s biodiversity
and opportunities to become involved in biodiversity
conservation initiatives.
Page 21 of 138

Page 28

13
Section 5: Public Engagement and Workforce Development  - Continued
Ref. No. Action Inputs/Outputs Outcomes
5.4 OneRen Natural History
Department
Paisley Museum Reimagined project in main construction
phases and then exhibition planning to effect transformation.
This will bring new life to the natural history collections and
exhibits.
Targeted fourfold increase in visitor numbers (i.e. 125,000
per annum) after reopening in 2025, so clear opportunities
for raised awareness and increased participation in
biodiversity conservation.
5.5 Environment, Housing and
Infrastructure Services:
staff deployed for outdoor
environmental education and
interpretation at Gleniffer Braes
Country Park.
•  Environmental education provided at Gleniffer Braes Country
Park for 150 pupils in 2021, 272 in 2022 and 386 in 2023.
•   Face-to-face interpretation provided for 70 adults in 2022, 
as well as a corporate volunteering day for 80 employees. In
2023 five events involving 56 people were organised, including
partnership activities with the Paisley Natural History Society.
•  Glenburn Nursery used Glen Park in Gleniffer Braes Country
Park for Forest Kindergarten activities in 2021.
•   Other groups used site for self-programming activities.
Raised awareness of Renfrewshire’s biodiversity and the
need for biodiversity conservation.
5.6 Renfrewshire Schools
supporting biodiversity
education.
Schools continue to provide children with opportunities for
direct contact with nature, particularly through gardening
activities.   A number of schools have EcoGroups linked to the
Keep Scotland Beautiful “Eco-Schools” programme.
•   Pupils have direct contact with nature in an everyday
situation.
•   Pupils have greater awareness and increasing
participation in biodiversity conservation.
5.7 Clyde Muirshiel Regional
Park’s Ranger led educational 
programme
Environmental education sessions were delivered to 1094
people in 2021/23, from pre-nursery up to secondary and
tertiary education.
Digital marketing and promotional activities support many
education and outdoor learning messages and information
provision with a Facebook ‘reach’ figure of 273,432 people
engaging online in 2021/23.
Raised awareness and increased participation in
biodiversity conservation.
Page 22 of 138

Page 29

14
Section 5: Public Engagement and Workforce Development  - Continued
Ref. No. Action Inputs/Outputs Outcomes
5.8 Muirshiel Country Park’s
“Branching Out” mental health
recovery programme.
35 participants in past three years. Improved mental and physical health for the people in
Renfrewshire using and caring for their woodlands, green
spaces and nature.
5.9 Clyde Muirshiel Regional Park
Communications
Clyde Muirshiel Regional Park has a growing presence on
social media. At the end of March 2023 there were:
•  6,000 Facebook ‘likes’
•  2,129 Twitter followers
•  355,500  video views on YouTube.
•  1,400 followers on Instagram.
Wider range of people know  about Clyde Muirshiel
Regional Park, its biodiversity and opportunities to become
involved directly in its conservation.
5.10 “Team Up to Clean Up” campaign Four TCV wildflower meadow creation/maintenance
workshops were arranged through the Council’s Team Up
to Clean Up  team. Organised in addition to regular series of
community clean-up events and activities.
5,000 engaged community members involved in clean-up
events.
Page 23 of 138

Page 30

15
6: Research and Monitoring
Biodiversity research and monitoring has continued during this period. Its resource demanding nature means that most of this work is undertaken to support
specific policies or to guide improved management of Council land.
Section 6: Research and Monitoring
Ref. No. Action Inputs/Outputs Outcomes
6.1 Review of Sites of Importance
for Nature Conservation
(SINCs)
Scope prepared for commissioned survey and review of SINC’s. Prioritised approach to survey and review to be
developed over 2024.
6.2 Clyde Muirshiel Regional Park •  124 species surveys were undertaken in the past three years. Data
from these were fed into appropriate national survey databanks for
bumblebees, butterflies and birds.
•  Six samples of water quality at Castle Semple Loch were analysed to
check for microbiology and levels of chemicals associated with algal
blooms.
•  Improved knowledge of numbers and distribution
of species available locally and at a national level.
•  Risk of damaging algal blooms affecting
biodiversity and recreational uses is evaluated
effectively.
6.3 Clyde Muirshiel Regional Park
staff working with partners
Ospreys colonised Clyde Muirshiel in the last reporting period, and
continue to return as a nesting species each spring:
2020 - 1 chick
2021 - 2 chicks
2022 - 3 chicks
Osprey, a key species, have bred successfully, 2020
- 2022, raising six chicks -  and 11 since their first nest
five years ago.
6.4 Gleniffer Braes Country Park
faunal surveys
Daily logs of birds and other incidental wildlife maintained by Countryside
Rangers and reported to local records centres.
Knowledge of local wildlife distributions and statuses
improved.
Page 24 of 138

Page 31

16
7. Biodiversity Highlights and Challenges
This period was challenging for local authorities and other tiers of government, as well as community and voluntary sector partners. The report has placed a strong
emphasis on partnerships and cross-sector working and biodiversity conservation will have to be linked even more firmly with community recovery in order to
progress towards the Scottish Biodiversity Strategy targets in future years.
7. Biodiversity Highlights and Challenges
Ref. No. Action Inputs/Outputs Outcomes
7.1 HIGHLIGHT: Actions to
support and coordinate the
inter-agency LBAP Support
Group for Renfrewshire, East
Renfrewshire and Inverclyde.
•  8 online meetings held, chaired and coordinated by Renfrewshire
Council officers.
•  Emails from local biodiversity partners, outside agencies and national
organisations circulated to represented organisations.
• Biodiversity conservation discussed by local
communities, the Council, and other public agencies
as an important local issue requiring priority
treatment in the local area.
7.2 HIGHLIGHT: Drafting the
Renfrewshire Biodiversity
Action Plan 2023-2027 on
behalf of local partners in
readiness for publication and
implementation.
•  Informal review of the 2018-2022 edition presented to the LBAP
Support Group and discussed to evaluate successes and to indicate new
directions for 2023 onward.
•  Proposals for actions to include from 2023 agreed.
•  Drafting of new Plan on behalf of partnership.
•  Partnership approach to delivering biodiversity
conservation initiatives resulted in actions being
contributed by organisations outside the Council.
•  Plan recognised as a reference document by all
sectors.
7.3 HIGHLIGHT: Partnership
approach has permitted
landscape scale initiatives,
innovative projects and direct
community involvement in
biodiversity conservation.
•  Partnership with SEPA to investigate the feasibility of daylighting the
Candren Burn at Ferguslie Park.
•  Partnership with NatureScot’s Peatland Action and the Glasgow City
Region Clyde Peatlands Project to develop proposals to restore 200ha of
blanket bog in the Renfrewshire Heights SPA/SSSI.
•  Regeneration Capital Grant Fund application submitted to Scottish
Government to create Foxbar Community Garden, promote a local nature
network and regenerate vacant land.
•  Local groups actively supporting neighbourhood biodiversity as a result
of Council fund allocations.
Greater community engagement and voluntary
involvement in biodiversity conservation.
Council (and partner organisations) resources used
efficiently and effectively in a challenging economic
environment.
Page 25 of 138

Page 32

17
7. Biodiversity Highlights and Challenges  - Continued
Ref. No. Action Inputs/Outputs Outcomes
7.4 HIGHLIGHT: Appointment of
two new operational staff posts
for biodiversity and  woodlands/
trees has enabled series of
enhancements to proceed on
Council land in line with locally
expressed wishes.
•  19 new biodiversity areas on previously manicured amenity
grassland mapped and summarised on a bespoke StoryMap
on the Renfrewshire Council website.
Successful grant application submitted to the Nature
• Restoration Fund for the Renfrewshire Rivers Project,
seeking to control five invasive non-native plant species in
five river catchments.
Increase in areas with enhanced biodiversity and greater
levels of awareness about the needs for conservation work.
7.5 CHALLENGE: integrating
biodiversity conservation into
Council strategies at a time
when resource challenges drive
decisions.
•  Environment & Infrastructure Services appointed two new
members of staff to pursue operational projects on Council
land.
•  Plan for Net Zero published.
•  Strong commitment towards biodiversity conservation
established across the Council.
•  Value of healthy semi-natural habitats recognised in
Renfrewshire’s Plan for Net Zero.
7.6 CHALLENGE: scaling up
biodiversity conservation work
to comply with new legislative
demands arising from Scottish
Biodiversity Strategy, Nature
Networks, reviews of locally
designated sites, etc.
•  Plans for peat restoration projects on the ground being
developed.
•  Planned development of a Renfrewshire Forestry &
Woodland Strategy.
•  Investigation into feasibility of deculverting the Candren
Burn in Paisley.
•  Funding secured to control invasive non native plant
species along five watercourses.
•  Biodiversity Action Plan commits to explore landscape
scale habitat enhancements on Council owned land.
•  Nature Networks strengthened and given enhanced
core area to act as sources for  future spread of wildlife
populations.
Page 26 of 138

Page 33

Regeneration & Place Section
Chief Executive’s Service
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1JD
Tel: 0300 300 0144 
E:  pt@renfrewshire.gov.uk 
Renfrewshire Council
Biodiversity Duty Report  2023
Page 27 of 138

Page 34

Page 28 of 138

Page 35

___________________________________________________________________
To: Planning and Climate Change Policy Board
On: 19 March 2024
___________________________________________________________________
Report by: Director of Environment, Housing & Infrastructure
___________________________________________________________________
Heading: Consultation on Heat in Buildings Bill
___________________________________________________________________
1. Summary 
1.1 Reducing Carbon Emissions is one of the principle measures to address
climate change and is a key priority for all Local Authorities. Renfrewshire
Council recognises that climate change will have far reaching effects on
Renfrewshire’s economy, its people and its environment and is determined to
lead by example in tackling the causes of climate change. 
1.2 Renfrewshire Council declared a climate emergency in June 2019 and
approved the Plan for Net Zero in August 2022, which committed to working
towards net zero by 2030 for both the Renfrewshire area as a whole and
Renfrewshire Council as an organisation. This challenging target covers all
aspects of energy use within the Renfrewshire wide area. Homeowners can
help achieve these targets by ensuring their home is energy efficient. In doing
so, there are many long-term benefits, such as carbon savings, reducing
energy bills and by supporting the local economy. 
1.3 This paper provides an update on the Heat in Buildings Bill consultation which
was launched on 28 November 2023 and will be open until 8 March 2024.
Delivering net zero for Scotland's buildings - Heat in Buildings Bill: consultation -
gov.scot (www.gov.scot)
1.4 The consultation proposes new laws that would set a minimum energy
efficiency standard for owner occupied and private rented homes, as well as
the heating systems that all buildings would be permitted to use in time. The
paper includes an outline of the proposals and the implications for local authority
LHEES. 
The proposed Bill: 
• prohibits the use of polluting heating systems after 2045, and before then at
point of property purchase or when a heat network connection is available in
a Heat Network Zone; and, 
Item 3
PACC190324 Page 29 of 138

Page 36

• require a minimum energy efficiency standard by 2028 for Private Rental
Sector and 2033 for owner occupiers. 
1.5 The consultation refers to “polluting heating systems”, this refers to direct
emissions heating systems, such as gas and oil boilers, that produce emissions
when used to heat buildings or provide hot water. The term “clean heating
systems” is used to describe systems that do not produce any emissions in
buildings when used, such as heat pumps and heat networks. 
__________________________________________________________________________________
2. Recommendations
It is recommended that the Board: 
2.1 Notes the consultation proposals, and homologates the submitted response,
as detailed within Appendix A, and
2.2 Requests a further report is brought to a future meeting of this Policy Board,
when the Bill has been finalised with an update on implications for the
Service.
_________________________________________________________
3. Background
3.1 Scotland has a legal target to reach ‘net zero’ greenhouse gas emissions. The
Climate Change (Emissions Reduction Targets) (Scotland) Act 2019 requires
us to reach net zero by 2045, as well as to achieve a 75% reduction in
emissions by 2030 and a 90% reduction in emissions by 2040.
3.2 In addition to Scotland’s net zero targets, there are strategic national targets
relating to lowering emissions from our buildings through the decarbonisation
of heat; improving energy efficiency in domestic and non-domestic building
stock.
3.3 It has been proposed to introduce a draft Bill containing the powers to create
a new ‘Heat in Buildings Standard’. The draft Bill and Standard will:
• Reconfirm that the use of polluting heating systems will be prohibited
after 2045; and
• As a pathway to 2045, require those purchasing a home or business
premises to end their use of polluting heating systems within a fixed
period following completion of the sale.
• introduce a new law that will require homeowners to make sure that their
homes meet a reasonable minimum energy efficiency standard by 2033.
• private landlords will be required to meet this minimum energy efficiency
standard by 2028.  
Page 30 of 138

Page 37

3.4 The consultation has described five points in time at which people may be
asked to meet the Heat in Buildings Standard: 
• One - at the end of a grace period which follows the completion of a
property purchase;
• Two - following notice from a local authority to a building owner in a Heat
Network Zone that they are required to end their use of polluting heating;
• Three - at the end of 2028, private landlords will need to have met the
minimum energy efficiency standard;
• Four - at the end of 2033, owner occupiers will need to have met the
minimum energy efficiency standard; and
• Five - at the end of 2045, all building owners will need to have ended their
use of polluting heating.
3.5 The Bill aims to Set a minimum energy efficiency standard within properties to
ensure homes achieve as good a level of energy efficiency as possible. It is
key that home owners can improve the energy efficiency of their homes in a
way that is simple and affordable. It is proposed that a minimum energy
efficiency standard can be met by installing a straightforward list of measures.
The list of measures would be developed to prioritise those that could have
most impact for homes with the lowest amount of cost and disruption. Any
home owner who had installed these measures – or as many of them as are
feasible for the type of home they live in – would be considered to have
reached a good level of energy efficiency and meet the new standard. The
proposes list includes:
• 270 mm loft insulation;
• cavity wall insulation (CWI);
• draught-proofing;
• heating controls;
• 80mm hot water cylinder insulation;
• Suspended floor insulation
3.6 The Scottish Government is proposing to introduce a new law which will
require those purchasing a property to comply with the prohibition on polluting
heating within a specified amount of time following completion of the sale.
Under this proposed law, the purchaser of a property will be given time –
known as a ‘grace period’ – to have the work carried out.
3.7 The Heat in Buildings Standard proposes to provide Local Authorities with
powers to require buildings within a Heat Network Zone to end their use of
polluting heating systems (by a certain date, and with a minimum notice
period). The benefits of these proposals are twofold:
• Firstly, a heat network developer would know which buildings would be
required to transition from polluting heating, and by when – allowing the
developer to confidently design and construct the ‘spine’ of a network
accordingly. This is important, as the spine of a network can be costly,
time-consuming and disruptive to install and so should ideally be done at
once. When it is installed, it becomes relatively easy and affordable to
extend the network to connect other areas in future.
Page 31 of 138

Page 38

• Secondly, building owners required to look for alternative heating systems
are far more likely to join the heat network. This will provide greater
assurances to investors about the revenue that a new heat network is
likely to receive, which will help convince them in turn to make that
investment decision and to reduce the cost of finance. This can lead to
lower costs of heat to homes and businesses as end users.
3.8 It is proposed that if homeowners, landlords and businesses are being asked
to invest in this transition, then there is a real case for the public sector to
show leadership by taking early and sustained action to decarbonise its
estate. This will also help to further develop the supply chain for
manufacturers and installers of new heating systems and energy efficiency
products.
3.9 It is proposed that all public buildings would have to be heated using clean
heating systems from 2038, with significant investment required to do so.
Potential duties placed upon Local Authorities include:
• Placing a new duty on public sector organisations which
would prevent them from replacing a polluting heating system with
another (unless impractical); and/or
• Creating a new duty for each public body to develop and implement
a plan to decarbonise their buildings; and/or
• Placing a new statutory reporting duty on public sector
organisations to demonstrate progress towards their 2038
objective (with the potential for the 2038 then to be non- statutory);
and/or
• Placing no further statutory requirements on public sector
organisations (instead relying on their ability to plan alongside our
delivery and funding programmes to meet the 2038 objective). 
3.10 A further report will be brought to a future meeting of this Policy Board, when
the regulations have been finalised, with an update on implications for the
Service.
___________________________________________________________________
Implications of the Report
1. Financial – significant impact, the proposals set out in the Bill would result in
all public buildings being given energy efficiency targets with a requirement of
significant investment in new, non-polluting heating systems throughout the
estate.
2. HR & Organisational Development – None. 
3. Community/Council Planning – None.
4. Legal – None.
5. Property/Assets – significant impact, the proposals set out in the Bill would
result in all public buildings being required to replace there polluting heating
system with a non-polluting equivalent by 2038. 
Page 32 of 138

Page 39

6. Information Technology – None.
7. Equality & Human Rights – 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.
8. Health & Safety – None. 
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None.
12. COSLA Policy Position – N/A.
13. Climate Risk – Significant, the proposals set out in this Bill would be a key
driver to decarbonising Scotland’s buildings by ensuring that all polluting
heating systems are replaced by non-polluting heating systems by 2038.
_________________________________________________________
List of Background Papers
• Consultation on proposals for a Heat in Buildings Bill 
• A new Monitoring and Evaluation Framework for Heat in Buildings 
_________________________________________________________________ 
Author: Craig Doogan, Energy Team Leader, Energy Management Unit  
Email:  craig.doogan@renfrewshire.gov.uk 
Page 33 of 138

Page 40

Appendix A 
Renfrewshire Council response to the
‘Heat in Buildings Bill’ Consultation 
Full consultation can be viewed at:  Delivering net zero for Scotland's buildings -
Heat in Buildings Bill: consultation - gov.scot (www.gov.scot) 
Questions on Chapter 2 - The Heat in Buildings Standard
Q1. To what extent do you support our proposal to prohibit the use of polluting
heating systems in all buildings after 2045?
Strongly support, the Heat in Buildings Bill aligns with Renfrewshire Council Net Zero
target. Renfrewshire Council would be cautious of the cost to the consumer to install
green technologies.
Q2. To what extent do you agree that we should introduce a minimum energy
efficiency standard to be met by private sector landlords by the end of 2028 (even if
they are already using clean heating)?
Somewhat support, it is essential that buildings are made more energy efficient prior
to the installation of a green heating system, such as a heat pump. If not, then the
heat being generated would be wasted as the thermal performance of the building
has not been improved, or, if the heating has inadequate controls. It would be a
concern that private sector landlords could increase their charges to the tenant to
cover any required works.
Q3. To what extent do you agree that we should introduce a minimum energy
efficiency standard to be met in owner occupied homes (which still have a polluting
heating system) by the end of 2033?
Strongly support, It is essential that support is available for those households who
cannot afford to install additional energy efficiency measures. There is currently
funding available through ECO Flex 4. This could result in a greater uptake if
households were made aware of a compulsory requirement moving forwards.
Q4. Do you agree with our proposal to set a minimum energy efficiency standard that
can be met by either installing a straightforward list of measures, or showing a good
level of energy efficiency based on a reformed EPC fabric efficiency metric?
Somewhat support, the list of measures is good for homeowners who are not energy
efficiency minded as it gives them a list to work from. Listing suspended underfloor
insulation can be viewed as unreasonable as the cost and disruption far outweighs
any environmental benefit. There is a risk of punishing those who already cannot
afford to heat their homes by imposing levels that can only be achieved with
significant investment in homes that are likely to be the least energy efficient.  
Page 34 of 138

Page 41

Q5. What is your view on the initial proposed list of measures to meet the minimum
energy efficiency standard?
Somewhat support, the list of measures is good for homeowners who are not energy
efficiency minded as it gives them a list to work from.
Q6. Do you think that properties for which most or all of the measures on the initial
proposed list are not relevant should be required to meet an equivalent minimum
energy efficiency standard?
Yes – they should be required to meet the standard and additional measures should
be included on the list (such as solid wall insulation, solid floor insulation and flat roof
insulation), but they should only be required to install some of these where feasible
and cost effective. A pragmatic approach is required to ensure that hard to treat
properties are targeted where it is financially viable to install such measures. By
making these additional measures mandatory, it may prove difficult to sell these
properties in the future. A clear definition as to what is cost effective is required to
remove any dubiety.
Q7. Do you think that an alternative approach to setting the minimum energy
efficiency standard is required?
No, more than one method risks diluting the message.
Q8. Do you agree that the use of bioenergy should continue to be permitted in
certain circumstances?
Yes, it should be permitted for those buildings already using it and for those
buildings who have no other clean heating system available.
Questions on Chapter 3 - Property Purchases
Q9. To what extent do you support the requirement to end the use of polluting
heating following a property purchase?
Somewhat support, house purchasers would likely have to increase their mortgages
to cover the cost of any upgrade. It could also prevent sellers from getting the
expected property value. 
Q10. We are proposing to give those purchasing a property a ‘grace period’ to end
their use of polluting heating. Do you agree with this proposal?
Yes – the grace period should be three years.
Q11. To what extent do you support our proposal to apply a cost- cap where people
are required to end their use of polluting heating following a property purchase?
Somewhat support, a cost cap would be difficult to manage. Setting a cap based on
a properties floor area does not fully reflect a fair system. Many older properties, for
example ex council houses may have large floor areas, however, they may not be as
affluent as modern new build homes with smaller floor areas.
Page 35 of 138

Page 42

Q12. Which of the following methods of applying a cost-cap do you support?
a. A flat cost-cap.
b. A size-based cost-cap.
c. A purchase price-based cost-cap.
d. None.
e. Another, please suggest below.
Q13. To what extent do you support the proposal that the Scottish Ministers should
be given powers to extend the circumstances in future (beyond a property purchase)
in which people could be required to end their use of polluting heating?
This could be, for example, preventing the installation of new fossil fuel boilers when
replacing the heating in your home or business premises?
Neither support nor oppose, changing guidance could lead to a watering down effect
of existing guidance and could have a negative impact on future legislation. the
routemap has to be concise and long-term to avoid doubt/confusion
Questions on Chapter 4 - Connecting to Heat Networks
Q14. To what extent do you support our proposal to provide local authorities (and
Scottish Ministers) with powers to require buildings within a Heat Network Zone to
end their use of polluting heating systems by a given date?
Somewhat support, Scottish Local Authorities are in the process of delivering their
LHEES with the next phase looking at potential district heating schemes. In order to
get buy-in and to size any future schemes, there is a need for a mandatory
connection to ensure the system is designed and costed correctly. There must be
the caveat that for any cost to the consumer there must be a means-tested review
for any assistance that may be required to enable the transfer.
Q15. To what extent do you support our proposal to provide powers to local
authorities (or Scottish Ministers) that require developers to connect new buildings
within Heat Network Zones to a heat network?
Strongly support, existing Heat Networks should be fully utilised when a new build
development is being proposed.
Q16. To what extent do you support our proposal to require occupiers of non-
domestic properties to provide information about unused heat on their premises?
Strongly support, many building users will be unaware of the benefits to utilising
unused heat and would not have the knowledge to utilise the heat within a heating
network.  
Page 36 of 138

Page 43

Q17. To what extent do you support our proposal to potentially require buildings with
unused heat to provide this to a local heat network?
Somewhat support, however, further work would have to be undertaken to determine
who would install the infrastructure to accommodate this, and to who’s cost? 
Questions on Chapter 5 - Monitoring and Enforcement
Q18. We will need to have a way to monitor if people are meeting the Heat in
Buildings Standard, and discussed two options for this. Which do you support?
a. Submitting EPCs alone.
b. Sampling a percentage of buildings.
c. A combination of the two.
d. None, there should be no monitoring.
e. Another method, please suggest below or explain your selected answer.
Further investigation would be required to determine who would administer any future
schemes. 
Q19. We will need to have a way to enforce the Heat in Buildings Standard. We
discussed possible options to help achieve compliance. What are your views on
these ideas?
a. I support relying on market and financial product mechanisms such as mortgages
or home/ building insurance.
b. I support extra Council Tax and Non-domestic Rates charges, in future, for those
who don’t comply.
c. I support the introduction of civil penalties, in future, if compliance is not achieved.
d. I support a mixture of the above options.
e. I do not support the suggested enforcement tools, but have another suggestion
(please provide below).
f. I do not support any form of enforcement.
Q20. To what extent do you support our proposals to modify the Standard or exempt
certain people from the need to meet the Heat in Buildings Standard?
Neither support nor oppose
Q21. Which people, businesses, or types of buildings, if any, should be eligible for a
modified standard or exemptions? 
Page 37 of 138

Page 44

There may be people who have a modified heating set-up to serve a specific
disability.
Q22. To what extent do you support our proposals to give certain people extra time
to meet the Heat in Buildings Standard?
Somewhat support, first time buyers, or household in fuel poverty may struggle to
find the additional capital to bring their property up to the standard.
Q23. Which people, businesses or types of buildings, if any, should be eligible for
extra time?
First time buyers, or households in fuel poverty.
Questions on Chapter 6 - Public Sector Buildings
Q24. To what extent do you support our proposal to require all buildings owned by a
Scottish public authority to be using clean heating systems by 2038?
Somewhat support, it is important that all buildings in Scotland have the same
energy standard throughout. With Scottish Local Authorities owning such a large
property portfolio there will be significant financial demands put on authorities at a
time when local authorities have severe financial pressures. Renfrewshire Councils
ongoing Strategic Property Review plans to try and reduce/rationalise our property
portfolio, with particular focus being to:
• Reduce its carbon footprint (including energy consumption)
• Have a financially sustainable property portfolio.
Q25. We are considering the following further duties on public sector organisations
to support planning for the transition by 2038:
a. Placing a new duty on public sector organisations which would, from 2025,
prevent them from replacing a polluting heating system with another (unless
impractical);
b. Creating a new duty for each public body to develop and implement a plan
to decarbonise their buildings;
c. Placing a new statutory reporting duty on public sector organisations to
demonstrate progress towards their 2038 objective (with the potential for the 2038
then to be non- statutory); and/or
d. Placing no further statutory requirements on public sector organisations (instead
relying on their ability to plan alongside our delivery and funding programmes to
meet the 2038 objective).
Most local authorities have set targets to work towards their local authority area
becoming net zero. Roadmaps are being developed looking to highlight how our
buildings can transition to net zero and what is required to achieve the target.
Page 38 of 138

Page 45

Page 39 of 138

Page 46

Questions on Chapter 7 - Amendments to Existing Legislation
Q26. Do you agree with our proposals to include powers in the proposed Heat in
Buildings Bill to change the current requirement in legislation for a narrowly-defined
renewable heat target?
Yes, this will bring more clarity and a better understanding.
Q27. Do you agree that the Heat Networks (Scotland) Act 2021 should be amended
in light of the passage of the Energy Act 2023?
Yes, it should be aligned to reflect the Energy Act 2023.
Q28. Are there any further amendments to the Heat Networks (Scotland) Act 2021
that the Scottish Government should consider?
Local Authorities could benefit from a better definition of who will
administrate/enforce/market the new Heating In Buildings Standard. 
Page 40 of 138

Page 47

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  19 March 2024
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading:  Tree Preservation Order Requests
___________________________________________________________________ 
1. Summary 
1.1 This report seeks to provide an update to the Tree Preservation Order (TPO)
requests which were considered at previous meetings of the Planning and
Climate Change Policy Board. 
1.2 The requests submitted are considered in line with the relevant legislation,
namely, Section 160 of The Town and Country Planning (Scotland) Act 1997
as amended by the Planning etc (Scotland) Act 2006, and within the
procedures set out in the Town and Country Planning (Tree Preservation
Order and Trees in Conservation Areas) (Scotland) Regulations 2011. 
1.3 The report recommends that the tree preservation order in respect of specific
trees along Inchinnan Road, Renfrew be confirmed. 
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Confirm the tree preservation orders in respect of specific trees along
Inchinnan Road, Renfrew and agree that officers make the orders public
and register them with the Land Registry for Scotland. 
___________________________________________________________________ 
Item 4
PACC190324 Page 41 of 138

Page 48

3. TPO Requests Previously Considered 
3.1 At the meeting of the Planning and Climate Change Policy Board in November
2023, it was agreed that a TPO designation would be placed on specific trees
along Inchinnan Road, Renfrew. 
3.2 In respect of the sites noted above and in line with the Renfrewshire Planning
and Development Tree Policy 2022, and the relevant legislation relating to
Tree Preservation Orders, Officers have undertaken the following:
 Prepared the relevant orders and made them available online for review;
 Served the orders on relevant parties including landowners;
 Published public notices in the local press advising of the orders; and
 Provided an opportunity for comments to be made by any interested party
in relation to either of the orders. 
3.3 The 28 day consultation period has now concluded in respect of the
aforementioned site with no comments being received. 
3.4 The Board are therefore asked to confirm the TPO designation in relation to
specific trees along Inchinnan Road, Renfrew.
___________________________________________________________________ 
4 Next Steps 
4.1 The TPO order in respect of specific trees along Inchinnan Road, Renfrew are
confirmed, made public and registered with the Land Registry for Scotland. 
___________________________________________________________________
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
4. Legal – The recommendations in the report would require tree preservation
orders to made in relation to the sites in question.  Should the orders be
confirmed they would require to be lodged with the Land Register of Scotland. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. 
Page 42 of 138

Page 49

No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – None.
___________________________________________________________________ 
Author: David Love, Chief Planning Officer
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk
Page 43 of 138

Page 50

Page 44 of 138

Page 51

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  19 March 2024
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Heading:  S75 Agreements - Update
___________________________________________________________________ 
1. Summary 
1.1 This report seeks to provide an update in respect of S75 agreements which
are currently being negotiated by officers following a decision being made in
relation to the respective planning application.   
1.2 S75 agreements secure planning obligations which seek to mitigate the
impacts of a proposed development and make it acceptable in planning terms. 
They can be used to secure financial contributions to, or in-kind provision of,
necessary new social and community infrastructure to support new
developments. 
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Note the ongoing negotiations which are taking place in respect of
securing planning obligations which will be secured by a Section 75
agreement, in accordance with Section 75 of the Town and Country
Planning (Scotland) Act 1997. 
___________________________________________________________________ 
3. Background 
3.1 Planning obligations seek to mitigate the impacts of a proposed development
and make it acceptable in planning terms. 
Item 5
PACC190324 Page 45 of 138

Page 52

They can be used to secure financial contributions to, or in-kind provision of,
necessary new social and community infrastructure to support new
developments. 
3.2 Obligations are usually entered into in accordance with Section 75 of Town
and Country Planning (Scotland) Act 1997, as amended, and are commonly
referred to as S75 Agreements.  They are often used where a planning
condition or another form of legal agreement would not be appropriate to
address the impact of the development in question. 
3.3 Planning obligations can be entered into between a person with an interest in
the land and the planning authority; or via a unilateral undertaking by a person
with an interest in the land. S75 agreements run with the land and the
obligation continues to be enforceable against any subsequent owner of the
land until such time as the details of the agreement are fully discharged by the
local planning authority. 
3.4 Scottish Government’s policy on Planning Obligations is expressed in Circular
3/2012 (Planning Obligations and Good Neighbour Agreements - Revised
2020). The Circular sets out five tests which must be met when seeking to
secure a planning obligation:
 Necessary to make a proposal acceptable in planning terms (and
overcome a barrier to the approval of planning permission);
 Serve a planning purpose where it is possible to identify infrastructure
provision requirements to advance, should relate to development plans;
 Be related to the proposed development either as a direct consequence of
it or arising from the cumulative impact of development in an area;
 Fairly and reasonably relate in scale and kind to the proposed
development (provide or contribute to the provision of infrastructure that
would not be necessary were it not for the development, on a
proportionate pro-rata basis as appropriate, but not to resolve existing
deficiencies); and
 Be reasonable in all other respects. 
3.5 A number of planning applications have been approved subject to a Section
75 agreement being put in place.  For information, it should be noted that
planning consent is not issued until such times as the Section 75 agreement
has been signed and registered as required.   
3.6 The following applications are currently subject to Section 75 negotiations:
 19/0749/PP: Erection of residential development comprising 96 dwellings,
with associated open space, roads, access, landscaping, engineering and
infrastructure works at 40 Rannoch Road, Johnstone;
 22/0178/PP: Residential development comprising 59 dwellinghouses and
24 flats, including access, drainage, landscaping and associated works at
a site between Sandieland Wood and Florish Road, Erskine; and
 22/0481/PP: Erection of residential development comprising 64 dwellings
with associated road and drainage infrastructure at former St. Brendans
Social and Recreation Club, Stirling Drive, Linwood. 
Page 46 of 138

Page 53

19/0749/PP: 40 Rannoch Road, Johnstone 
3.7 The above noted application relates to the erection of a residential
development comprising 96 dwellings, with associated open space, roads,
access, landscaping, engineering and infrastructure works. 
3.8 The application was approved subject to conditions and a S75 legal
agreement at the meeting of the Communities, Housing and Planning Policy
Board in January 2022. 
3.9 The S75 legal agreement seeks to secure the provision of affordable housing
units by way of 8 affordable homes. 
3.10 Following the Board decision, a draft S75 agreement has been exchanged
between all parties concerned. However, to date, no agreement has been
reached. 
3.11 Negotiations are ongoing between officers and representatives of the
applicant and concern the mechanism and triggers associated with the
delivery of the 8 affordable housing units.   
22/0178/PP: Site between Sandieland Wood and Flourish Road, Erskine 
3.12 The above noted application relates to the erection of residential development
comprising 59 dwellinghouses and 24 flats, including access, drainage,
landscaping and associated works. 
3.13 The application was approved subject to conditions and a S75 agreement at
the meeting of the Planning and Climate Change Policy Board in November
2022. 
3.14 The S75 agreement is required to secure the following:
 24 affordable flats;
 Financial contribution in respect of education provision within the school
catchment; and
 The provision of a formal pedestrian crossing point on Florish Road,
Erskine. 
3.15 Following the board decision, a draft S75 agreement has been exchanged
between all parties concerned. However, to date, no agreement has been
reached. 
3.16 Negotiations had been ongoing in respect of a financial contribution towards
education provision and the details relating to the formal pedestrian crossing
point on Florish Road.  Delays however had been encountered as a result of
the wider education issues relating to school estate within the catchment in
question.   
3.17 Furthermore, we would advise that following the demise of the applicant,
Stewart Milne Group Ltd, no further discussions have been had and in this
Page 47 of 138

Page 54

regard we are awaiting confirmation from the administrator or any new
developer / landowner on how they wish to proceed.   
22/0481/PP: Former St. Brendans Social and Recreation Club, Stirling Drive,
Linwood 
3.18 The above noted application relates to the erection of a residential
development comprising 64 dwellings with associated road and drainage
infrastructure. 
3.19 The application was approved subject to conditions and a S75 agreement at a
meeting of the Planning and Climate Change Policy Board in November 2023. 
3.20 The S75 agreement is required to secure the following:
 Financial contribution in respect of enhancements to an offsite play park to
the north of Gilmartin Road, Linwood and associated tree planting;
 Financial contribution in respect of education provision within the school
catchment; and
 The provision of affordable housing in line with the respective LDP
policies. 
3.21 Following the board decision, details of the applicant’s legal representatives
have been requested to allow discussions relating to the S75 agreement to
commence.  To date, officers have not been able to obtain such details and as
such discussions relating to the S75 agreement have been delayed.   
___________________________________________________________________ 
Implications of the Report 
1. Financial – Should the S75 agreements be signed and registered planning
consent will be issued and thereafter any financial contributions will require to
be paid to the Council in line with the respective agreement.  Payments
received would then be released to the appropriate service as required to
meet the obligations set out in the associated legal agreement or, if not spent
in accordance with the agreement, returned to the applicant where applicable.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal – S75 agreements require to be negotiated in line decision made at the
respective Board meeting and thereafter registered as appropriate following
agreement and signing.  Thereafter obligations will require to be discharged or
varied where appropriate when monies have been spent or returned. 
 
5. Property/Assets – None. 
6. Information Technology – None. 
Page 48 of 138

Page 55

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – None.
___________________________________________________________________ 
Author: David Love, Chief Planning Officer
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk
Page 49 of 138

Page 56

Page 50 of 138

Page 57

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 19 March 2024
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Site Development Brief – Paisley Grammar School 
___________________________________________________________________ 
1. Summary 
1.1 A site development brief has been prepared for Paisley Grammar School,
Glasgow Road, Paisley. 
1.2 The Education and Children’s Services Policy Board of 21 January 2021
approved the relocation of Paisley Grammar School to a new campus at
Renfrew Road, Paisley (23/0283/PP).  The new School is anticipated to begin
construction later this year and open in 2026.   
1.3 Board approval to declare the current Paisley Grammar School building surplus
will be sought from the Infrastructure, Land and Environment Board at a future
meeting.  The development brief for the site will be progressed subject to this
approval. 
1.4 The development brief identifies a number of factors which will require to be
considered in preparing development proposals for the site.  The brief will be a
material consideration in the assessment of future planning applications. 
1.5 If approved, a copy of the development brief will be put on the Council webpage
at www.renfrewshire.gov.uk/article/12717/Development-briefs 
___________________________________________________________________ 
Item 6
PACC190324 Page 51 of 138

Page 58

2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the site development brief relating to the current Paisley
Grammar School, Glasgow Road, Paisley. 
___________________________________________________________________ 
3. Background 
3.1. The development brief sets out a planning framework for the potential
development site and highlights a number of considerations which require to be
taken into account in preparing a development proposal.  These include:- 
 Site context
 Site layout and building design
 Access and parking
 Landscaping and boundary treatments
 Sustainable urban drainage
 Renewables/sustainability 
4. Next Steps 
4.1. If approved by the Board and following approval of the Infrastructure, Land and
Environment Board to declare the property surplus, the development brief will
be placed on the Council’s web pages and used to guide development
proposals for the site. 
______________________________________________________________ 
Implications of the Report 
1. Financial – None.. 
2. HR & Organisational Development – None. 
3. Community Planning – 
Reshaping our place, our economy, and our future – the proposed
development brief sets out a framework for supporting, encouraging, and
delivering sustainability, climate change adaption, reaching Net Zero, biodiversity
gain and creating great places. 
4. Legal – None. 
5. Property/Assets – Site to be marketed for sale if declared surplus by Council in
due course. 
6. Information Technology – None. 
Page 52 of 138

Page 59

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Change – The proposed development brief seeks to ensure that any
development progressed will be undertaken in a sustainable manner and supports
adaption measures required as a result of climate change. 
___________________________________________________________________ 
Appendices 
(a)  Paisley Grammar School, Glasgow Road, Paisley – Development Brief 
List of Background Papers 
(a)  Education and Children’s Services Policy Board, 21 January 2021 -  Response
to proposal to consult on the relocation of Paisley Grammar School to a new
build Community Campus at Renfrew Road, Paisley
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk Tel: 07483 136235
Page 53 of 138

Page 60

Paisley Grammar, Glasgow Road, Paisley  
Development Brief 2024 DRAFT
Page 54 of 138

Page 61

Paisley Grammar, Glasgow Road, Paisley 
Development Brief 2024
Introduction
The purpose of this development brief is to set out the planning context
and provide design advice in relation to the development opportunity at
Paisley Grammar, Glasgow Road, Paisley.
Background Information
In May 2019 the Education and Children’s Services Policy Board
approved the report Developing the School Estate Management
Plan which included a proposal to undertake a statutory consultation
on building a new Paisley Grammar School.  A condition survey had
categorised Paisley Grammar school as condition level C which meant
that the building was showing signs of major defect and that it was not
operating as intended. A short list of three options were considered
which included:
Following the formal consultation process which gained support from the
school, wider community and Education Scotland the recommendation
was to build a community campus on the former Chivas Regal site at
Renfrew Road, Paisley.  This campus will be ambitious and forward
thinking and will incorporate a flexible learning resource for young
people  with additional support needs and a variety of facilities to support
community learning and enterprise activity for the wider community.
It is anticipated that the new school will become operational in 2026 and
the existing Paisley Grammar site will be declared surplus to requirements.
New build Paisley Grammar Community Campus at  
existing location;
New build Paisley Grammar Community Campus at  
Renfrew Road in Paisley; and
New build Paisley Grammar Community Campus at  
Seedhill Road in Paisley.
DRAFT
Page 55 of 138

Page 62

Paisley Grammar History
The foundation stone of Paisley Grammar / William Barbour Academy
was laid in 1896. The School was officially opened in 1898 and consisted
of a central building with two towers one on each side.
Over time the building has been altered to reflect the needs at the time.
In the 1920s provision was made for a primary department which was
known as the Crossflat Crescent Annexe.  In the 1940s two blocks of
temporary huts were constructed where the east and west wings currently
stand.  These temporary buildings lasted until major construction was
undertaken in the late 50s/ early 60s when the west and east wings
were constructed along with a gymnasium and assembly hall.
In the early 2000s there was the reorganisation of school provision
in Paisley and major work was undertaken to improve and extend the
facilities of Paisley Grammar. Two new three storey classroom blocks
were erected to the rear of the existing building to provide additional
classroom space and new library, games hall and changing facilities. 
This work was completed in 2002.
Source: http://www.paisleygrammarschool.com/school-history.html  
C
A B
D
B
C
D
A
NN
Paisley Grammar School
Glasgow Road (A761) 
DRAFT
Page 56 of 138

Page 63

Local Context Map Key
Site
400m / 800m Radius
A Road
Local Road
Train Station
Train Line
Conservation Area
Housing Regeneration 
Programme
Policy P 1 -
Renfrewshire’s Places
Policy P 6 -
Open Space
Policy C 1 -
Renfrewshire’s Network of Centres
DRAFT
Page 57 of 138

Page 64

Site Context
Paisley Grammar is located to the east of Paisley Town Centre along
Glasgow Road (A761). Glasgow Road is a key transport link between
Paisley and Glasgow. The site is bounded on all sides by either Glasgow 
Road, McKerrell Street or Crossflat Crescent. 
The original building designed by T G Abercrombie in Scots Renaissance
style, 1960s wings, janitors lodge, boundary walls and gatepiers are
Category B Listed (http://portal.historicenvironment.scot/designation/
LB39129)
Site Context
The site is approximately 1.6ha in size.  The principal elevation faces
towards Glasgow Road and lies just outside the Greenlaw Conservation
Area. The original Paisley Grammar and 1960s extension is set back
approximately 40m from the street. There is currently staff parking and
playground space to the front of the building as well a tree belt and
grass area along Glasgow Road that provides the landscape setting for
the Listed Building. The main entrance to the site is through the Listed
Gatepiers.  There is also vehicular access to the site from McKerrell
Street.
Towards the north east corner of the site is the Janitors House that
was designed by the local architect James Steel Maitland in an art
deco style. It should be noted that the Janitors House is outwith the
development site.
The area is urban in nature. There is mixed land use in the surrounding
area.  To east, south and west of the site is primarily residential use,
in particular traditional tenement properties. Glasgow Road offers
a wide range of local shops and services.  Within a 10 to 15 minute
walk there are local primary schools, Barshaw and East End Park,
supermarkets and Paisley Town Centre which offers a wide range of
shops and services.
The site has good access to public transport. There are bus stops
adjacent to the site with frequent bus services to Paisley and Glasgow.
Both Paisley Gilmour Street Station and Hawkhead Station are both
within a 10 to 15 walk.
DRAFT
Page 58 of 138

Page 65

Regeneration and Renewal Programme
The council is currently undertaking a  housing
regeneration and renewal programme across
Renfrewshire aimed at delivering modern,
high quality, energy-efficient and affordable
council housing which will contribute to the
transformation of Renfrewshire as a place.
To the south of Paisley Grammar is the Howard
Street/ Auchentorlie renewal program where
there is a vision to enhance the Howard Street
and Auchentorlie/Seedhill areas as part of
a wider 20 minute neighbourhood. The aim
is create places where people can live well
locally with well connected with greenspaces,
facilities and activities which support a
healthy and sustainable place.
A mix of demolition and housing investment
is proposed and this will provide the
opportunity to reimagine spaces within the
area, including the enhancement or creation
of new community space which act a focus
for residents and align with the aspiration for
the neighbourhood as a liveable, sustainable
and productive place.
Proposed demolition
Proposed housing investment 
Howard Street Area
DRAFT
Page 59 of 138

Page 66

Site Layout and Building Design
This section of the development brief sets out the main planning parameters
that should be taken into account in preparing development proposals for the
site. It does not intend to be prescriptive in terms of imposing a specific layout
or building design but rather to establish basic principles.
Any development proposal must be comprehensive, imaginative, and use place-
based design principles. Key Listed Buildings must be retained and incorporated
in a sympathetic manner. Early engagement with Council Officers and Historic
Environment Scotland is encouraged to consider further detail in this regard. 
Any new ancillary development such as parking or bins should also be located
appropriately, to protect the setting of the Listed Building.
Land Use
The site is considered suitable for a range of uses compatible with those
neighbouring, in accordance with the Local Development Plan. It is
considered that the site may offer particular opportunity for residential
use. As Paisley Grammar is Category B Listed it is considered to be a key
heritage asset which is a priority for adaptation and restoration.
Built Form
The Council supports the implementation of guidance from the Scottish
Government in respect of innovative approaches to place making, in
particular Designing Places and Designing Streets. Renfrewshire’s Places
Design Guide sets out further guidance in relation to sustainable place
making and design which requires to be reflected in any development
proposal: http://www.renfrewshire.gov.uk/article/3041/Development-
Planning-Guidance. Development proposals for the site should reflect
the approach and principles established in these documents. Any new
development must be sympathetic to the listed buildings on site and the
wider context in relation to height. DRAFT
Page 60 of 138

Page 67

Landscaping and Boundary Treatments
Development must protect existing trees, protecting important habitats
and biodiversity as well as maintaining the existing natural screening. The
trees also provide an important landscape setting for the Listed Buildings.
In order to protect existing trees, any development should include
landscape buffers around trees, which will be informed by a tree survey
provided by the applicant. The landscape buffers will ensure any new
development is sited well clear of root protection areas and the crown
spread of trees.
The provision of planting and preservation of trees must be in line with
the Renfrewshire’s Planning & Development Tree Policy.
There is a presumption against any tree removal on site and any
proposed development should be designed to take account of existing
trees on site. Should the development proposal identify the removal
of any trees, a detailed justification together with a comprehensive
landscaping scheme and appropriate compensatory planting will be
required.
Boundary treatment using high quality materials and planting will be
required to define public and private spaces contributing to the areas
character.
DRAFT
Page 61 of 138

Page 68

Accessibility
Innovative design solutions in respect of access and parking which
reflect the principles of Scottish Government guidance are welcome.
As a general requirement, all roads, footpaths, servicing and parking
requirements should be designed in accordance with the guidance set out
in the National Roads Development Guide (SCOTS, 2017) and Design
Manual for Roads and Bridges.
Parking and service provision will be subject to development type.
Early engagement with the Council as the Roads Authority is encouraged
to consider further detail in this regard.
Sustainable Urban Drainage Systems
Drainage requirements, constraints and solutions will be integral to the
layout and submission of the planning application.
New development will require to integrate surface water management
into the design of green infrastructure including naturalised Sustainable
Urban Drainage Systems and permeable surfaces.
Renewables/Sustainability
Low or Zero carbon generating technologies require to be integrated
into the development proposal including the use of both active carbon
reducing technologies such as solar panels or ground source heat
pumps and passive factors such as orientation, siting, ventilation and
sustainable materials. Provision requires to be made for electric car
charging points for residents.
These details will require to be outlined in a Sustainability Statement and
submitted along with the planning application.
P V
P
PP
P
V
P
Pedestrian & Vehicular Access
Bus Stop Locations
Site Boundary 
B Listed Buildings
C Listed Buildings C
B
DRAFT
Page 62 of 138

Page 69

Digital Connections
The development will incorporate existing or future high speed digital network
connections and other digital technologies that could improve connectivity. These
details require to be included in the submission of the planning application.
Affordable Housing
If a residential development is proposed and the site capacity exceeds 50 units,
affordable housing requirements will require to be addressed providing 25%
of the total site capacity as affordable homes.  Affordable housing requires
to be tenure blind with a similar design and style to the open market housing.
Early discussions with the Council are encouraged to discuss the requirements
for the delivery of affordable homes on site and potential Registered Social
Landlord partners.
Education Provision
If a residential development is proposed the cumulative impact of residential
development on both primary and secondary school provision will require
consideration subject to the final site capacity, potential site start and
phasing of the development. Once further details are known in relation to
the proposed development, it should be noted that a developer contribution
in respect of education provision may be required.
Open Space Provision
Children’s play areas are sought for all housing developments more than
50 units. Provision should be the equivalent to 1 square metre per house
in the form of a single area serving 50-150 units. Early engagement with
Development Management is encouraged to consider further detail in
this regard.
Developer`s Responsibilities
The developer will be solely responsible for the following:
• Establishing to their satisfaction the whereabouts of, and   
constraints concerned with all services in, on, over, under
and adjacent to the site.
• Ensuring compliance with all statutory undertakers’   
requirements.
• Establishing to their satisfaction the soil and mineral conditions 
of the site.
• Ensuring compliance with requirements of planning and   
building standards consent.
Supporting Information
A planning application should be accompanied by the following
information:
• Sustainability Statement
• Ecology Report/ Habitat Survey
• Drainage/Flood Assessment
• Transport Assessment/Statement
• Site Investigation (soil condition)
• Design and Access Statement
• Landscape / Built Heritage Visual Assessment & Plans
• Tree Survey and associated management, maintenance and 
compensatory planting plans
• Plan(s) detailing safe routes to schools/local services
• Planning StatementDRAFT
Page 63 of 138

Page 70

Further Enquiries
Further enquiries in relation to the content of this
planning statement should be directed to: 
dc@renfrewshire.gov.uk
Paisley Grammar, Glasgow Road, Paisley  
Development Brief 2024
DRAFT
Page 64 of 138

Page 71

___________________________________________________________________ 
To:  Planning and Climate Change Policy Board 
On:  19 March 2024
___________________________________________________________________ 
Report by: Chief Executive 
___________________________________________________________________ 
Title:  Developer Contributions (Education) – new planning guidance
___________________________________________________________________ 
1. Summary 
1.1 This report sets out proposed draft planning guidance on potential education
contributions from new housing development in Renfrewshire. 
1.2 The draft guidance supplements and aligns with the current relevant Local
Development Plan (LDP) policy I8 on Developer Contributions. 
1.3 Subject to approval of the draft guidance, the document will be published for a
period of stakeholder consultation before being brought back to Board for
formal approval as Council policy.
________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:
(i) Consider the new draft planning guidance on Developer Contributions
(Education) appended to this report;
(ii) Approve the draft planning guidance for stakeholder consultation for a 6-
week period;
(iii) Note that the outcomes of this consultation will be brought back to a
subsequent Board meeting for member consideration;
(iv) Delegate authority to the Convenor, in conjunction with the Head of
Economy and Development, to make any further incidental changes to the
draft document as may be relevant, to account for any changes made by
the Board and to ensure that the consultation document is as up to date
as possible at the time of publication; 
Item 7
PACC190324 Page 65 of 138

Page 72

________________________________________________________________________________ 
3. Background 
3.1 Planning and Climate Change Policy Board considered and noted a report in
January 2024 that set out the reasons why new planning guidance for
developer contributions (education) is being brought forward by Renfrewshire
Council in 2024. It also explained the key metrics that the Council will rely on
in its proposed new planning guidance. 
3.2 It is considered, therefore, that there is no need to repeat that background
context here. 
3.3 One question that has been raised with officers since the January Board
meeting is whether an “Infrastructure Levy” or similar policy mechanism could
be introduced in Renfrewshire, rather than (or alongside) the approach being
proposed in the new draft planning guidance. 
3.4 The Planning (Scotland) Act 2019 makes provision at Section 54 for Scottish
Ministers to present regulations that would lead to local authorities having the
ability to introduce an infrastructure levy for their area. However, these
regulations have not yet been published and, as such, local authorities are not
able to move forward with defining an approach for any prospective
Infrastructure Levy. Should this context change then officers will update
members. The draft guidance has been prepared with consideration that such
a mechanism may become available to Renfrewshire Council at a later date. 
4 Draft planning guidance 
4.1 The principal aim of the new guidance is to introduce a degree of certainty for
all stakeholders concerned with education capacity in Renfrewshire. Linking
with the Council’s Learning Estate Management Plan, the guidance aims to
clarify how planned housing development and the pupils they generate will be
accommodated within Renfrewshire’s schools. 
4.2 Applicants for planning permission for residential development will be
expected to use the guidance in shaping their planning applications and to
allow them to make allowance for any financial or other contribution that may
be expected from that proposed development. 
4.3 As is common with this type of policy in Renfrewshire (and elsewhere) the
expectation is that the applicant is expected to mitigate the impact from their
proposed development. 
4.4 The draft guidance offers clarification on the Council’s proposed approach to: 
 Pupil product ratio (the number of school age pupils likely to be derived
from the new homes built);
 How identified housing land and existing planning consents will be
factored in to any calculations;
Page 66 of 138

Page 73

 Planning applications for “windfall” (unidentified) housing sites;
 Dealing with the cumulative effect of multiple applications in the same
catchment;
 How the “operational capacity” of schools will be calculated;
 How the catchment of the denominational and non-denominational
primary and secondary schools will relate to the location of the planning
application site;
 Using individual school capacity statistics;
 Understanding the implications of planned school capital investment;
 New housing development requiring a new school to be provided;
 Developer contribution amounts to be negotiated for;
 Exceptions to the Council’s planning policy; 
5 Next Steps 
5.1 Subject to any changes Board wish to agree to make to the draft guidance,
the document will then be published for stakeholder consultation for a period
of 6 weeks in spring 2024. 
5.2 All representations made to the Council on their draft guidance will then be
brought back to the Planning and Climate Change Policy Board for their
consideration. The Board will then be asked to agree a final version of the
policy guidance which will be published on the Council’s website for use by
planning applicants for residential development in Renfrewshire. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – Significant potential impact, depending on the successful
implementation of any new developer contributions policy.   
2. HR & Organisational Development – Examination going forward of the
additional resources required to negotiate planning obligations because of
submitted / approved planning application. 
3. Community/Council Planning – 
 Our Renfrewshire is thriving – The new developer contributions policy
can assist in supporting new or enhanced community infrastructure
(schools) in connection with new housing for pupils living in the local
area;
 Building strong, safe, and resilient communities: The policy can assist in
the forward planning of education capacity requirements across
Renfrewshire’s varied communities and achieve positive education
outcomes for our younger residents; 
Page 67 of 138

Page 74

4. Legal – Likelihood of additional resource demand being placed on Council’s
Legal Team in terms of negotiating and confirming planning obligations
(including Section 75 Agreements) for a larger number of planning
applications. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position - None. 
13. Climate Risk – None.
___________________________________________________________________ 
Authors: 
Alasdair Morrison, Head of Economy and Development;
Tel: 07979 700472; Email: Alasdair.morrison@renfrewshire.gov.uk 
David Love, Chief Planning Officer
Tel: 07483 410182; Email: david.love@renfrewshire.gov.uk
Page 68 of 138

Page 75

RENFREWSHIRE COUNCIL 
Renfrewshire Local Development Plan 2021: Draft Planning Guidance
Developer Contributions (Education) Supplementary
Guidance
V.9.0
March 2024 
-------------------------------------------------------------------- 
CONTENTS 
1. Summary
2. Introduction
3. Background
4. Current Context
5. Calculating the Financial Contribution
6. Legal Agreements
7. Contact 
----------------------------------------------------------------------- 
1. Summary 
 The principal aim of the guidance is to set out new Renfrewshire Council
planning policy guidance on developer contributions towards education
capacity impacts from new housing development. The guidance aligns with
Policy I8 of the Renfrewshire Local Development Plan; 
 Once adopted this guidance will be used in the assessment of all planning
applications in Renfrewshire for residential development (subject to any
exceptions outlined in the policy); 
 The guidance has used information on the current and forecast school rolls
and capacity for all primary and secondary schools in Renfrewshire, taking
account of planned or proposed housing development that the Council is
aware of; 
 Renfrewshire continues to be a desirable location for new housing
development and will continue to face pressure to both identify additional
land and assess planning applications for this purpose. The guidance offers
details of the currently identified housing land supply in Renfrewshire; 
 The Council’s capital programme currently outlines investment plans for new
or replacement schools and planned extension of schools; 
 The guidance outlines the proposed pupil product ratio (average number of
pupils per new dwelling built) that has been generated from recent housing
developments in Renfrewshire. 
Page 69 of 138

Page 76

The Council will apply this average to future planning applications in
catchments of all denominational and non-denominational primary and
secondary schools; 
 Contributions will be sought for all housing developments which will result in
the relevant school’s operational capacity (85%) being met or breached by
the quantum of planned housing in the respective planning application is
factored to have generated the estimated number of pupils to the catchment; 
 The developer contribution negotiated for by the Council will be based on
estimated additional pupil impact from new homes granted planning
permission; 
 The specific developer contribution applied is based upon several sources
which are relevant to the current Renfrewshire context. The contribution rate
will apply across Renfrewshire on a uniform basis for all schools of that type; 
 Contributions will be confirmed through appropriate legal agreements
between the applicant/developer/landowner and Renfrewshire Council. New
housing development (as relevant) will not be built and occupied until such
agreements have been signed. Payment of contributions can, in certain
circumstances, be phased for a housing development; 
 Contributions will be sought from all planning applications for 10 or more new
dwellings on a site, except where that application site is located in a school
catchment where total identified land supply proposed will breach operational
capacity of the relevant schools. In such cases all new housing will require
to contribute, regardless of the scale of housing site proposed or timing of
the planning application; 
 Contributions will not apply to one-bedroom homes, to homes built
specifically for an older demographic resident or to student housing and will
be calculated at a lower rate of pupils per new home where flats / apartments
are proposed; 
=========================================================== 
Page 70 of 138

Page 77

2. Introduction 
2.1  This Developer Contributions (Education) supplementary guidance
document forms part of Renfrewshire Council’s non-statutory planning guidance
and is a material consideration in the determination of planning applications. 
Applicants and other stakeholders should take account of the guidance when
preparing development proposals.   
2.2 This guidance details the Council’s approach to securing developer contributions
in respect of education provision and will be reflected in all such discussions with
applicants in relation to proposals for residential developments. 
2.3 The guidance covers a range of issues related to education impact from new
housing development, including current school capacity, proposed housing
development by catchment, estimated pupil product ratios from new housing and
links to Renfrewshire Council’s Learning Estate Management Plan. 
2.4 It makes clear the expected financial contributions from planning applications for
new housing developments in school catchments which (as a result of the new
housing being built) will meet or breach agreed operational capacity levels. 
Aims of the guidance 
2.5 The principal aim of this new guidance is to introduce a degree of certainty for all
stakeholders concerned with education capacity in Renfrewshire. Linking with
the Council’s Learning Estate Management Plan, it clarifies how housing
developments and the school pupils they generate will be accommodated within
Renfrewshire’s schools. 
2.6 Renfrewshire’s Planning Service actively encourage discussions with
prospective applicants for residential development at the earliest opportunity to
ensure that they are fully conversant with the implications of this (and other)
planning guidance before submitting applications for development.  Prospective
applicants are encouraged to submit a pre-application enquiry in the first instance
to dc@renfrewshire.gov.uk. 
Review 
2.7 This guidance will be reviewed at regular intervals to ensure that the education
and housing land supply data which informs it is as up to date as possible. 
3. Background 
Purpose of planning obligations 
3.1 Planning obligations seek to mitigate the impacts of a proposed development
and make it acceptable in planning terms. They can be used to secure financial
contributions to, or in-kind provision of, necessary new social and community
infrastructure to support new developments.
Page 71 of 138

Page 78

3.2 Obligations are usually entered into in accordance with Section 75 of Town and
Country Planning (Scotland) Act 1997, as amended, and are commonly referred
to as Section 75 Agreements (S75).  They are often used where a planning
condition or another form of legal agreement would not be appropriate to address
the impact of the development in question. 
3.3 Planning obligations can be entered into between a person with an interest in the
land and the planning authority; or via a unilateral undertaking by a person with
an interest in the land. S75 agreements run with the land and the obligation
continues to be enforceable against any subsequent owner of the land until such
time as the details of the agreement are fully discharged by the local planning
authority. 
3.4 Scottish Government’s policy on Planning Obligations is expressed in Circular
3/2012 (Planning Obligations and Good Neighbour Agreements - Revised
2020). The Circular sets out five tests which must be met when seeking to secure
a planning obligation: 
 Necessary to make a proposal acceptable in planning terms (and overcome
a barrier to the approval of planning permission); 
 Serve a planning purpose where it is possible to identify infrastructure
provision requirements to advance, should relate to development plans; 
 Be related to the proposed development either as a direct consequence of
it or arising from the cumulative impact of development in an area; 
 Fairly and reasonably relate in scale and kind to the proposed development
(provide or contribute to the provision of infrastructure that would not be
necessary were it not for the development, on a proportionate pro-rata basis
as appropriate, but not to resolve existing deficiencies); and 
 Be reasonable in all other respects.  
3.5 A planning authority may utilise an alternative legal mechanism to secure
developer contributions in certain circumstances.  Section 69 of the Local
Government (Scotland) Act 1973 provides the Council with the power to enter
into an agreement with the developer with the discharge of any if its functions. 
Known, more widely, as Section 69 Agreements, they can include payment of
financial contributions and is normally used when a one-time payment of a
developer contribution is agreed, without the need for this agreement to be
binding on subsequent owners of the land. 
Page 72 of 138

Page 79

Renfrewshire’s Planning Policy Context 
3.6 Section 25 of the Town and Country Planning (Scotland) Act 1997, as amended,
requires that planning applications be determined in accordance with the
development plan, unless material considerations indicate otherwise. In the case
of Renfrewshire, the development plan currently consists of: 
 National Planning Framework 4 (NPF4; 2023); and 
 Renfrewshire Local Development Plan 2 (2021) 
3.7 Policy 18 of NPF4 (Infrastructure First) seeks to encourage, promote and
facilitate an infrastructure first approach to land use planning, which puts
infrastructure considerations at the heart of placemaking. The policy notes that
developments will be supported where they provide or contribute to infrastructure
in line with that identified as necessary in Local Development and Delivery
Programmes. 
3.8 In addition, Policy 18 notes that the impacts of development proposal on
infrastructure should be mitigated. The policy states that: 
Development proposals will only be supported where it can be demonstrated
that provision is made to address the impacts on infrastructure. Where planning
conditions, planning obligations, or other legal agreements are to be used, the
relevant tests will apply. 
3.9 Policy I8 of the Renfrewshire Local Development Plan (Developer
Contributions) sets the policy context for the outlined framework:   
Contributions will be sought for the following items to address infrastructure
deficits and/ or a shortfall in infrastructure capacity that arise as a direct result
of new development. Any contribution sought will be appropriate, proportionate,
necessary and relevant to the nature of the development, its scale and its
location: 
 Education – additional classrooms and associated school facilities
required to support the operation of a school, related to the number of
pupils generated by the development; 
 Healthcare Services and Facilities – where investment is required to
provide healthcare infrastructure to address increased demand generated
by the development; 
 Traffic Management and Active Travel – traffic signals, crossings,
measures required in relation to road safety and providing safer routes to
school, active travel connections and improvements to the road network
required to support the development; 
 Public Transport Infrastructure – where investment is required to
address increased demand associated with the development; 
Page 73 of 138

Page 80

 Open Space – where a contribution is required to enhance open space
provision off-site to support the development; 
 Blue/Green Infrastructure – where a contribution is required in relation
to the sustainable management of water and where mitigation including
on-site or offsite habitat creation or enhancements to watercourses are
required. 
Recent housing development in Renfrewshire 
3.10 Renfrewshire has been the subject of significant levels of housebuilding in recent
years.  The development of sites at Renfrew Riverside, Dargavel, Hawkhead
Road in Paisley and Johnstone South West (amongst others) have kept
completions at a relatively high level. 
3.11 The table below illustrates the annual total new build completions by year since
2012. Full analysis of Renfrewshire’s housing land supply on a site-by-site basis
is available in the annually published Housing Land Audit.  
YEAR OWNER
OCCUPIED
PRIVATE
RENTED
COMBINED
LA/SOCIAL
HOUSING
ANNUAL TOTAL
NEW HOUSING
COMPLETIONS 
2012-13 251 0 173 424
2013-14 313 0 210 532
2014-15 517 0 26 543
2015-16 577 0 101 678
2016-17 643 0 167 810
2017-18 601 0 107 708
2018-19 784 0 175 959
2019-21 1,383 0 324 1,707
2021-22 572 0 222 794
2022-23 422 0 195 617
Total 5,812 0 1,527 7,348
Annual average
(10 years)  581 0 153 734 
4. Current Context 
Renfrewshire school capacity 
4.1 Current school rolls at each of Renfrewshire’s 62 primary and secondary schools
are published by Renfrewshire Council on an annual basis. School rolls are
regularly updated by the Council and published online to allow for this policy to
reflect the latest circumstances in the assessment of planning applications.
Calculations of developer contributions will be based on the latest published
information of school rolls and capacity. 
Page 74 of 138

Page 81

4.2 Each residential property which is located within Renfrewshire has a ‘catchment’
for denominational and non-denominational primary and secondary school
assigned to it. This is determined by the geographical location of the property
and each school’s delineated catchment area in which the property is located. 
4.3 Although the Council aims to provide enough places for all children at the
preferred catchment primary and secondary school, living within the delineated
catchment area of a school does not guarantee a child a place at a catchment
school. 
Operational school capacity 
4.4 The “operational capacity” of a school is considered by Renfrewshire Council to
be reached when it is at 85% of its original design capacity. This is taken as the
same for all schools, regardless of denomination, location, and scale. The
rationale for 85% in the Renfrewshire context is that flexibility is required in each
school to plan accommodation across all year groups and allow for sufficient
communal and circulation space.   
4.5 The design capacity is used by Renfrewshire Council as the benchmark as, over
time, changes have been made to the operational configuration of schools which
may not align with the original design purpose of that space. For example, this
could have been to meet a short-term requirement for cohorts in a particular year
group. The calculation of capacity for the purposes of this policy will be made on
the original intended purpose of spaces rather than necessarily their current use.
Guidance will be sought from the Council’s Director of Children’s Services and
the school’s headteacher in this regard. 
4.6 Renfrewshire Council prepares 7-year rolling forecasts for the number of pupils
expected at each of its primary and secondary schools. This is based upon
anticipated pupil journeys through the school estate and also the range of
planned housebuilding expected to take place across Renfrewshire in this time
period. Renfrewshire Council have also utilised the expertise of external
consultants to advise on school roll forecasting. 
4.7 The 85% operational capacity, together with school roll forecasting, enables the
Council to produce a “RAG” (red / amber / green) status for each Renfrewshire
school in relation to planned new housing development as set out in the
published Housing Land Audit. It should be noted that the timescale for the
building of this identified housing supply is by no means certain or guaranteed.
These % capacities will therefore be kept under regular review by the local
authority. 
4.8 It should be borne in mind that the Council’s forecast school rolls do not account
for any “windfall” housing sites (see definition below) that may emerge during the
period. The Council reserve the opportunity to update these % capacity forecasts
for individual schools as new information on such windfall sites becomes
available. 
Page 75 of 138

Page 82

Windfall housing site (definition) – a site, which is granted planning
permission for housing development which, at the time of that decision, was
not identified as part of the housing land supply in either the Council’s Local
Development Plan or Housing Land Audit 
Insert link to online source of information on individual school capacities 
Currently planned school investment 
4.9 The Council’s Learning Estate Management Plan provides further details on
planned future investments in Renfrewshire schools. This Plan, in turn, will be
reflected in the Council’s Capital Programme which is published annually. 
4.10 At present the education school investment projects reflects the published
Capital Programme (for year 2024 / 25). The specific timing for the delivery of
each of these projects will be updated in each Capital Programme publication. 
4.11 Some of the school investments will be made in the knowledge that contributions
will be sought towards the total cost. Although the Council may be anticipating
making capital investment in its school estate, this will be in anticipation of
additional impacts from new housebuilding and therefore the expectation will be
that all such housebuilding, regardless of the specific context of the school and
its catchment, will be expected to meet the terms outlined in this guidance. 
Currently Planned Housing 
4.12 This guidance seeks to take account of all known housing sites within
Renfrewshire and as such the accompanying map indicates approximate
locations for residential sites (greater than 10 units) which are allocated within
the Local Development Plan, benefit from planning permission or appear in the
Council’s published annual Housing Land Audit. More details of each are
included in the listed documents which are available on the Council’s website. 
4.13 As outlined elsewhere in this guidance, the Council is unable to anticipate all
housing development. “Windfall” sites will occur.  The Council reserve the
opportunity to amend calculations within this guidance because of these
unknown sites emerging and being proposed for housing development. Should
they be granted planning permission they will be expected to contribute
financially in line with the approved guidance. 
Page 76 of 138

Page 83

5. Calculating the Financial Contribution 
Pupil Product Ratio 
5.1 The pupil product ratio (PPR) is a commonly used calculation to demonstrate the
number of pupils likely to be generated by new housing.  Most local authorities
in Scotland use a PPR in determining the level of education development
contribution for policies of this type. 
5.2 Renfrewshire Council has based its PPR (see below) on evidence from research
into housing developments over recent years (2010 -2023). 
5.3 Differentiation is drawn between flats and houses. This is because flats will
generally have fewer bedrooms and therefore less pupils likely to be living at
each address than compared to typical houses. 
Age group Type of school Pupil Product Ratio per new
home  
Houses Flats
Primary schools Denominational 0.090 0.018
Non-
Denominational
0.250 0.050
Total  0.340 0.068    
Secondary schools Denominational 0.052 0.018
Non-
Denominational
0.135 0.027
Total  0.187 0.045
Page 77 of 138

Page 84

5.4 As illustrated in the example below, impact will be measured across all 4 principal
school types for each proposed residential development. This will occur at the
time of a planning application being considered by the Council. In any instances
where the pupils generated by the new housing would cause the operational
capacity threshold to be met or exceeded, a developer contribution will be sought
from that application. 
5.5 In applying such a policy, it should be borne in mind by applicants that a
contribution could be required to all 4 school types in a particular location, or as
few as 1 school type contribution, may be required depending on the current
capacities of these schools and the calculated number of additional pupils that 
particular development will generate (see also “cumulative effect in same
catchment” section of this guidance). 
5.6 The PPR values will be reviewed by the Council (and updated if necessary) every
2 years following the adoption of this revised policy. 
PPR - Worked example 
5.7 The table below illustrates the calculation of PPR for a planning application for
50 new homes, made up of 30 houses and 20 flats. 
5.8 These additional pupil numbers would then be assessed against the predicted
school rolls and capacities for the schools in the relevant catchment. 
Age group Type of school Estimated number of pupils
generated from new residential
development  
Houses (#30) Flats (#20)
Primary schools Denominational 2.70 0.36
Non-
Denominational
7.50 1.00    
Secondary schools Denominational 1.56 0.36
Non-
Denominational
4.05 0.54 
Cumulative effect of multiple applications in same catchment 
5.9 Each planning application will be assessed individually and on its own merits
against the context at the time that the application is submitted and validated by
the Council. 
5.10 In considering any planning application submitted, the baseline will be
considered as being all new homes consented at that time and all proposed
homes on allocated housing sites in that catchment. 
Page 78 of 138

Page 85

The Council will assume that all such homes consented and allocated will be built
as planned in the timescales estimated (as detailed in the Housing Land Audit).
Council officers responsible for monitoring housing land supply will be involved
in assessing cumulative impact, as will colleagues in Children’s Services in terms
of real time changes in school enrolments. 
5.11 The practical implication of this is that the school roll forecast will be updated
annually by the Council, and this will affect planning applications not yet
determined. Those making planning applications for residential development are
therefore encouraged to engage at an early stage in the process. 
5.12 The Council will be able to discuss the implications of this cumulative effect for
the calculation of an individual developer contribution with any prospective
applicant. 
Approach to assessing planning applications for new housing 
5.13 If 9 or less homes proposed then no developer contribution is required unless, in
combination with other identified housing sites in that catchment, the operational
capacity of the school in question would be increased above 85% by the delivery
of this development. 
5.14 If 10 or more homes proposed then: 
i. PPR calculated for that new housing development across all four school
types;
ii. Estimates (in discussion with housebuilders) on delivery timescale of homes
(by year);
iii. For each additional pupil generated (over and above the operational capacity
of schools in that catchment, taking into account the cumulative effect of all
proposed housing in that catchment), applicant will be expected to contribute
the per additional pupil amount set out in this guidance;
iv. Consideration given to whether physical extension may be required to
schools within the catchment because of the new housebuilding;
v. Consideration as to whether physical extension is achievable at schools
concerned;
vi. Calculation of cost of extension to school (based on recent Renfrewshire
examples) 
5.15 If number of proposed housing units is not defined in planning application [eg.
through an application for planning permission in principle] then: 
i. Estimate of numbers based on location, site characteristics and size of site;
ii. Average number of bedrooms per unit estimated to calculate predicted PPR;
iii. Process outlined above (depending on size of site) is followed; 
Page 79 of 138

Page 86

New school required because of new housing development 
5.16 The approach set out in this guidance does not preclude specific contexts where
large scale housing allocations may require new school provision as part of the
future community facilities planning for that location. If this is the case this will be
set out clearly in the Council’s LDP and its Learning Estate Management Plan in
advance of any planning application being considered for that site. 
5.17 The situation may arise in terms of future housing development, as it did recently
in Renfrewshire with the Dargavel Masterplan, where a new school needs to be
provided to meet the demand from additional pupils resulting from new housing
being built. The size of site required for a new school is very much dependent on
the proposed capacity of that school and therefore cannot be determined in
advance. 
5.18 The context for this, the policy approach and the expectations from the
developers involved (including land requirements and the respective values
attributed to that) will be set out in full in the Renfrewshire LDP and its associated
documents when they are published. 
Figure 1: Diagram showing the decision process once a planning application
is received. 
Page 80 of 138

Page 87

5.19 It should be noted that there will operational maximums for the number of pupils
any school will be able to accommodate, even with physical extension or
replacement by new school. This will be determined by Renfrewshire Council’s
Director of Children’s Services. 
Developer Contribution per pupil 
5.20 Renfrewshire Council has taken the approach to negotiate for requisite developer
contributions on a per additional pupil basis. The Council believe this is fairest
way to calculate any contribution, as opposed to using a per housing unit basis,
as it allows the Council to monitor contributions and estimates of capacity impact
against the number of pupils which eventually transpire for the relevant schools.   
5.21 The Council have utilised several sources to assist in calculating the proposed
developer contribution rate per pupil from new housing developments set out in
this guidance, including: 
 Recent new school developments in Renfrewshire – both new build and
extensions;
 Planned school investments in Renfrewshire;
 Scottish Futures Trust’s evidence base of school building costs; 
 Developer contributions sought by other Scottish local authorities in the most
up-to-date examples of such planning policies;
 Discussions with HubCo West on their data of school construction costs in
recent years; 
5.22 Based on these sources of evidence, the developer contributions which
Renfrewshire Council will be seeking from all new housing development (that
meet the terms of this guidance) and which trigger the capacity thresholds in the
relevant school catchments is as follows: 
School type Primary school Secondary school
Level of contribution per
pupil
£56,000 £56,000 
5.23 In terms of the level of contribution it should be noted by applicants this
contribution level is stated as at (insert month) 2024 and any required changes
to this amount will be indexed linked in line with BCIS costs at (insert quarter)
2024. 
5.24 The Council reserve the ability, depending on the scale of the residential
development proposed, to seek phased payments of the required contribution
linked to thresholds reached in terms of new housing units built over time. This
will be negotiated with the applicant at the time of the S75 being agreed. 
Page 81 of 138

Page 88

Where developer contributions will be used 
5.25 Developer contributions associated with this policy will be utilised to overcome
the impact in the specific catchment concerned from the increased number of
primary and secondary school pupils generated by new housing development. 
5.26 There may be school specific factors, such as space, and quality of ancillary
accommodation, which mean increasing capacity is not a practical solution. If it
is technically impossible to provide extra capacity, the Council may resolve the
issue using suspensive conditions to control the phasing of development or may
refuse planning permission. 
Exceptions to this policy 
5.27 All proposals relating to planning applications which result in new residential
units will be assessed against the policies outlined. 
5.28 Exceptions to the policy will be applied as follows: 
 Proposals for extending or altering existing residential dwellings; 
 Proposals which would not result in an increase in the number of residential
units; 
 Development proposals which involve nine residential units or less (unless,
in combination with other identified housing sites in that catchment, the
operational capacity of the school in question would be increased above
85% by the planned delivery of all proposed development); 
 Proposals involving one-bedroom dwellings; 
 Proposals for housing specifically aimed at an older demographic resident; 
 Proposals relating to student accommodation; 
 Proposals relating to sheltered accommodation, care homes or housing
designated for older age groups; and 
 Proposals where a Viability Assessment has been submitted and
independently verified and where Elected Members approve the
development. 
5.29 This list of exceptions will be kept under review by the Council and any changes
dealt with in future versions of the policy guidance. 
Page 82 of 138

Page 89

Viability Assessments 
5.30 Circular 3/2012 notes that the economic viability of proposals should be taken
into consideration when applying developer obligations and alternative solutions
should be considered including options of phasing or staging payments. 
5.31 The Council’s requirements from a viability assessment submitted by an
applicant for planning permission for residential is set out in Appendix 1. 
5.32 Please note this will only be applicable for planning applicants who wish to make
the case that the payment of a developer contribution would impact the financial
viability of the development in question. The applicant should bring this matter to
the attention of the Council’s Planning Team at the earliest opportunity. 
5.33 In all circumstances where a viability assessment has been undertaken,
determination of the application will be the responsibility of the Planning and
Climate Change Policy Board (or equivalent).   
6. Legal Agreements 
6.1 Developer contributions generally require applicants to enter into legally binding
contracts, or obligations with the local authority.  In line with this guidance,
planning permission will not be granted until the relevant legal agreement has
been concluded. The development should not commence until the decision
notice has been released for the relevant planning application by Renfrewshire
Council. 
Section 75 Agreements (S75) 
6.2 Following the Council’s decision to grant planning permission, planning officers,
together with legal colleagues, will finalise discussions in relation to seeking to
agree the terms of a S75 legal agreement. It is anticipated that the broad terms
of any agreement will have been discussed with the applicant before a decision
is reached. 
6.3 The S75 legal agreement requires to either be registered in the Land Register,
or acknowledgement has been received from the Keeper of the Register, prior to
the release of the Council’s application decision notice. 
6.4 In cases where the planning application relates to planning permission in
principle, depending on circumstances, the following process will be followed: 
 Where the planning permission in principle application outlines the number
of residential units, the application will be assessed, and any contributions
determined on the stated number of units.  The S.75 agreement will
thereafter secure the identified contribution noting the number of units
approved. 
Page 83 of 138

Page 90

 In circumstances where the planning permission in principle application
does not outline the number of residential units, the S.75 agreement will set
out the principles that will be applied to calculate the level of applicable
contribution in line with this guidance 
Section 69 Agreements 
6.5 In certain circumstances it may be appropriate for development contributions to
be secured via a Section 69 (S69) agreement.  This would be paid in full in one
instalment prior to planning permission being issued. There is no need to register
a S69 agreement as a burden against the land title. 
6.6 In the event that a contribution has been paid in respect of a S69 agreement, and
the proposed development does not go ahead, the Council will not return the
contribution if it has already been spent or committed for the purposes collected
within the timeframes agreed.  
Return of unused contributions 
6.7 All Section 75 agreements will be entered into in favour of the Council on the
expectation of having fifteen (15) years to expend the contribution received. 
Thereafter should contribution remain unspent, the contribution will be returned
to the applicant following a request from the applicant. This timescale reflects the
timescale taken to deliver larger housing sites and the resultant impacts on
school capacity that may be required. 
6.8 For developments involving phased payment of developer obligations the 15-
year period for spending contributions shall commence on the date that the final
phased payment is made to the Council. 
6.9 In the event of the contribution, or part of it, not being spent within this time period,
the contribution, or part of it, will be refunded to the applicant or their nominee
along with relative interest accrued. 
Contact 
7.1 For further information or to arrange a discussion in relation to developer
contributions, in the first instance please email dc@renfrewshire.gov.uk.  
Page 84 of 138

Page 91

APPENDIX 1 
Viability Assessments 
o Circular 3/2012 notes that the economic viability of proposals should be taken
into consideration when applying developer obligations and alternative
solutions should be considered alongside options of phasing or staging
payments. 
o The Planning Authority will give consideration to altering the levels or payment
structure of any planning obligations as part of financial contributions in the
interests of maintaining overall development viability.     
o In the event that the applicant considers that the payment of a developer
contribution would impact the financial viability of the development in question,
the applicant should bring this matter to the attention of the Planning Authority
at the earliest opportunity. 
o In such circumstances, the applicant will require to submit a Viability
Statement including ‘open book accounting’ of the proposed development. 
o The submitted Viability Statement will be evaluated and assessed by the
District Valuer in order to provide an independent view of the viability of the
proposed development. 
o The evaluation and assessment of any submitted Viability Statement will be
instructed by the Planning Authority; however, it should be noted that any
costs associated with undertaking the assessment will be recovered in full
from the applicant.   
o Thereafter the opinion of the District Valuer will form a material consideration
in the processing and determination of the planning application in question.   
o It should be noted that while Viability Statements will be treated as
confidential, full details of contributions, including an indication of the scale of
any agreed reductions will be reported to members of the Planning and
Climate Change Policy Board via the Report of Handling. 
o In all circumstances where a viability assessment has been undertaken,
determination of the application will be the responsibility of the Planning and
Climate Change Policy Board.   
Page 85 of 138

Page 92

Page 86 of 138

Page 93

___________________________________________________________________
To: Planning and Climate Change Policy Board
On: 19 March 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Renfrewshire Local Development Plan 3 Progress Update and
Local Place Plans
___________________________________________________________________
1. Summary 
1.1 This report provides an update for members on progress that is being made in
preparing the next Local Development Plan for Renfrewshire and the extensive
consultation and engagement that will take place in the coming months. 
1.2 The Planning (Scotland) Act 2019 gives new powers to communities to prepare
Local Place Plans for their area, as well as placing associated duties on the
Council. This report sets out the support that will be available to local
communities and the new requirements for the Council to validate and maintain
a register of Local Place Plans.
__________________________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the board:
(i) Note the update on the consultation and engagement that is to take place
with local communities to inform the preparation of the new Renfrewshire
Local Development Plan (LDP3);
(ii)  Note the new requirement for the Council to validate and maintain a register
of Local Place Plans prepared across Renfrewshire;
(iii)  Agree that the Planning and Climate Change Policy Board takes the decision
on whether a Local Place Plan should be validated; and,
(iii)  Note the support that is being offered to communities to help them prepare
a Local Place Plan for their area.
_________________________________________________________
Item 8
PACC190324 Page 87 of 138

Page 94

3. Preparation of Renfrewshire Local Development Plan 3 
3.1 The Planning and Climate Change Policy Board approved the Renfrewshire
Development Plan Scheme and Participation Statement (2023) at its meeting on
29 August 2023. This set out the programme for preparing the new Local
Development Plan and the extensive consultation and engagement that will take
place.  
 
3.2 Work is currently progressing to prepare the Local Development Plan Evidence
Report which will be presented to full Council for approval once finalised. This
evidence base will be informed by the views of local communities across
Renfrewshire. 
3.3 The Renfrewshire Local Development Plan hub will be launched on the Council’s
website by the end of March 2024. This will be the go-to location for information
on the preparation of the new plan and will host online community consultations. 
3.4 The hub will be used to host a ‘Have your say on Renfrewshire’s places’ survey
which will run for a minimum of two months. The initial survey will be targeted at
the general public, with later surveys and consultation work focused on children
and young people. 
3.5 The survey is based on the Scottish Government’s Place Standard tool and asks
respondents to score and comment on their local area based on a range of
factors. The survey response will be used to inform the new Local Development
Plan and can also be shared with local communities to inform the preparation of
their Local Place Plan. 
3.6 A ‘call for ideas’ consultation is also to be launched alongside the ‘Renfrewshire’s
Places’ survey. This consultation will run for two months and will give an early
opportunity for communities, developers, landowners and businesses to submit
ideas and proposals for sites and places within Renfrewshire, which will be
considered in preparing the new Local Development Plan. 
3.7 Each proposal and potential development site will be fully assessed in
consultation with key agencies during the plan preparation process. 
4. Local Place Plans 
4.1 The Planning (Scotland) Act 2019 includes new powers for communities to
prepare Local Place Plans for their area, as well as placing associated duties on
the Council to validate and maintain a register of Local Place Plans. 
4.2 Local Place Plans are community led plans which can be prepared by a
Community Council, or another community body as defined by the Community
Empowerment Act. They are to be focused on proposals for the development
and use of land. 
Page 88 of 138

Page 95

4.3 An invitation to prepare Local Place Plans was sent to local communities across
Renfrewshire in May 2023. Local Place Plans are to be completed and submitted
to the Council by May 2025 so they can be taken into account when preparing
the next Local Development Plan. 
4.4 To support the Local Place Plan process, workshop sessions with Community
Councils and Development Trusts across Renfrewshire will take place in late
March. 
4.5 These engagement sessions will be used to raise awareness of the opportunity
to prepare Local Place Plans, the legislative process that requires to be followed
by local communities, and the assistance that the Council will be offer to
community groups preparing Local Place Plans. 
4.6 The assistance that the Council will be able to offer community groups to prepare
Local Place Plans will be dependent on the level of interest, however, the
following assistance would be offered to all community groups by the Council: 
 ‘How to Guide’ to help communities prepare a Local Place Plan is available
on the Council’s website.
 Provision of mapping to support the preparation of plans.
 Assistance to apply for funding opportunities for professional /consultancy
support.
 Place Profiles published on the online Local Development Plan hub to
support communities to prepare the evidence base for their Local Place Plan. 
 A start up meeting would be offered to any group to talk through the process
of preparing a Local Place Plan.
 If the community group shares a draft plan with the Council, the Place
Strategy team will coordinate responses on the draft plan from relevant
Council services.
 Pre-validation check would be offered to give communities an opportunity to
ensure a Local Place Plan is valid prior to formal submission. 
Validation Process and Register of Local Place Plans 
4.7 The Council, as Planning Authority, is required to validate Local Place Plans
which meet the requirements of paragraphs 1(4) and 2(1) of Schedule 19 of the
Planning (Scotland) Act 2019. 
4.8 It is proposed that the decision of whether to validate a submitted Local Place
Plan would be taken by the Planning and Climate Change Policy Board. Officers
would aim to support communities to meet the legislative requirements before a
recommendation on whether to validate the Local Place Plan is made to the
Planning and Climate Change Policy Board. 
4.9 The validation process only considers the requirements of legislation regarding
the process of preparing a Local Place Plan and is not based on the content of
the Local Place Plans. 
4.10 Following validation, the Council is required to consider any registered Local
Place Plan when preparing the Local Development Plan.
Page 89 of 138

Page 96

4.11 It is anticipated that Local Place Plans may include proposals which go beyond
development and the use of land, and which would not be considered within the
Local Development Plan. These will be passed to the relevant Council services
for consideration. 
4.12 The Planning Authority will maintain a register of valid Local Place Plans which
will be available to view by the public in person at Renfrewshire House and on
the Council’s website. 
4.13 The register would include a map showing the land to which the Local Place Plan
relates as well as copies of plan and the associated validation report. 
Elected Member Training 
4.14 An Elected Member training session relating to the Local Development Plan and
Local Place Plans has been arranged for Tuesday 16th April at 11am. This will
be delivered online.
___________________________________________________________________
Implications of the Report 
1. Financial – None identified. As mentioned above it is not clear how many
communities will look to prepare a Local Place Plan and the support they will
require. Communities may seek support to prepare Local Place Plan through
appropriate Council funding e.g. Sustainable Communities Fund. 
2. HR & Organisational Development – It is likely that different communities will
require different levels of support from the Council. There is likely to be a call on
the time of officers in the Place Strategy team to assist in the preparation of Local
Place Plans. 
3. Community/Council Planning – 
The Local Development Plan and Local Place Plans are key documents in
establishing a land use framework for supporting, encouraging and delivering
economic development, a sustainable Renfrewshire, building strong and resilient
communities and working together to improve outcomes across Renfrewshire. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
Page 90 of 138

Page 97

If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – None. 
9. Procurement – None 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None. 
13. Climate Risk – The Local Development Plan and potentially Local Place Plans
support the re-use of vacant and derelict land for a range of uses including those
which can help address the climate crisis by managing flood risk and providing
biodiversity enhancements.
_________________________________________________________
List of Background Papers 
Renfrewshire Council Development Plan Scheme and Participation Statement 2023 
___________________________________________________________________ 
Author: Alan Williamson, Strategy and Place Manager,
alan.williamson@renfrewshire.gov.uk, 07811 053968
Page 91 of 138

Page 98

Page 92 of 138

Page 99

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0569/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley
Northwest 
Applicant: J29
(Scotland) Ltd c/o AS
Homes Scotland Ltd 
Registered: 01/09/2022 
 
RECOMMENDATION 
Refuse 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Approval of Matters Specified
in Conditions 2, 4 and 6 of planning permission in principle
approval 18/0638/PP, for the erection of a residential
development comprising 180 dwellinghouses 
LOCATION: Land at Junction 29, St James Interchange,
Ferguslie Park (Bound by Ferguslie Park Avenue, Existing
Railway Line, A737 And Blackstoun Road) 
APPLICATION FOR: Approval of Matters Specified in
Conditions 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 Planning permission in principle was previously granted
for a mixed-use development to include residential use
as well as hotels; a pub/restaurant; business, general
industry, storage & distribution; and long stay car
parking.
 This application seeks approval of matters specified in
conditions 2, 4 and 6 of the in principle consent as
regards the residential development of 180 dwellings.
 The site is identified as a Housing Land Supply Site in
the Renfrewshire Local Development Plan under which
Policy P2 applies.
 Children’s Services have objected on the grounds that
current school capacities are insufficient to accept
additional pupils from the new houses. 
 Chief Executive’s Service (Roads Development) have
objected to the site’s lack of connectivity.
 
 
Alasdair Morrison
Head of Economy &
Development
Item 9(a)
PACC190324 Page 93 of 138

Page 100

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 22/0569/PP 
SITE ADDRESS  Land at Junction 29, St James Interchange, Ferguslie Park (Bound by
Ferguslie Park Avenue, Existing Railway Line, A737 And Blackstoun
Road)
PROPOSAL  Approval of Matters Specified in Conditions 2, 4 and 6 of planning
permission in principle approval 18/0638/PP, for the erection of a
residential development comprising 180 dwellinghouses
RECOMMENDATION Refuse 
PROPOSALS This application relates to an area of land situated to the south of the
A737 and Junction 29 of the M8 Motorway and north of Ferguslie Park
Avenue in Paisley. 
Planning permission in principle was previously granted in 2019 (ref
18/0638/PP) for a mixed-use development on the land to include
residential use as well as hotels, a pub/restaurant, business, general
industry, storage & distribution uses and long stay car parking. This
current application seeks the approval of matters specified in
conditions 2, 4 and 6 of the planning permission in principle consent
as regards the residential element of the wider mixed-use
development. 
Condition 2 of the planning permission in principle consent (ref:
18/0638/PP) required that prior to development commencing on any
area/phase of the site, a further application setting out detailed plans
and other relevant information must be submitted and approved by the
Planning Authority for the particular area or phase in question. As
such, this application seeks consent for the detail of the residential
element and in this respect is seeking approval of a residential layout
comprising 180 dwellinghouses. Condition 2 in this regard requires the
submission of: 
(a) the siting, design and external appearance (including details of
materials to be used) of all buildings and other structures
within the site; 
(b) the details of; and timetable for, the hard, soft and water
landscaping of the site; 
(c) the design and location of all boundary walls and fences,
including along the boundary with Network Rail's land; 
(d) the provision of drainage works; 
(e) the disposal of sewage; 
(f) the submission of a detailed survey showing the location and
nature of all trees and hedges within the site; 
(g) access and parking arrangements, including the provision of
any new roads and junctions; 
Page 94 of 138

Page 101

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
(h) the layout of the site; 
(i) a Site Investigation report (characterising the nature and
extent of any soil, water and gas contamination within the site);
and, if remedial works are recommended therein;  
(j) a Remediation Strategy and Implementation Plan identifying
the proposed methods for implementing all remedial
recommendations contained with the site investigation report
prepared in accordance with current authoritative technical
guidance, has been provided by the Planning Authority; and  
(k) a report which satisfies the Planning Authority that the Local
Air Quality Management Objectives for the pollutants specified
in the relevant Air Quality Regulations, made under Part IV of
the Environment Act 1995, shall not be exceeded at any
location at or in the vicinity of the development where 'relevant
exposure' is liable to occur. In addition, the overall significance
of the air quality impacts from the development shall be
assessed and clearly defined within the report with mitigation
proposed where required. The survey and report shall adhere
to the methods and principles set out in the Scottish
Government publication 'Local Air Quality Management
Technical Guidance LAQM.TG(16)' and the EPUK guidance
document 'Land-Use Planning & Development Control:
Planning for Air Quality (January 20017)' or a method that has
been agreed with the Planning Authority. 
Additionally, Condition 4 of the planning permission in principle
consent states that the detailed submission required by Condition 2
must also contain a Drainage Impact Assessment (DIA), while
Condition 6 requires the submission and approval of a Noise Impact
Assessment (NIA) prior to any phase of the development being
brought into use. As such, the applicant has also submitted a DIA and
NIA in seeking approval of conditions 4 and 6 respectively. 
The proposed residential development, including its access, would
occupy an area of approximately 6.7 hectares towards the east of the
wider development site area. To the north-east the site is bound by an
existing railway line which connects Paisley with Inverclyde, while to
the west is an existing long stay car park. To the north, the residential
site is bound by part of the adjoining land to which the wider planning
permission in principle relates, with the area immediately to the north
having been identified for the pub/restaurant and hotel uses in an
indicative plan submitted with the previous application. 
The residential development would be bounded to the south by a
raised bund which marks the route of a dismantled railway line which
previously ran parallel to Ferguslie Park Avenue to the south. The
development would be accessed from Ferguslie Park Avenue via a
road which would be formed along the line of the former Middleton
Road which previously provided access to a smaller area of housing
Page 95 of 138

Page 102

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
to the north of the bund long since demolished. The road would run
roughly north-north-west from Ferguslie Park Avenue, passing
through a gap in the bund formed by the previous road. This would
lead to T-junction and the proposed residential development which
would be formed around a series of new interconnecting roads. 
The houses would comprise 25 three-storey townhouses and 155 two-
storey units contained within a variety of detached, semi-detached
and terraced house types. 102 of the units would accommodate three
bedrooms, with the remaining units comprising a mixture of 2-bed, 4-
bed and 5-bed properties. The finishing materials would include dry
dash render and concrete roof tiles, with 146 of the houses featuring
white render with grey roof tiles and the remaining 34 being of an
alternative colour scheme featuring cream/magnolia render and “rustic
red” roof tiles. 
The development layout also features a play area to the north end of
the site and an open space area towards the south, with a further area
of open space adjacent to the existing railway line to the north-east.
The development would also be served by a Sustainable Drainage
System which would entail the collection and routing of surface
drainage to a detention basin in the south-west of the application site. 
SITE HISTORY 92/1342/PP - Application for the erection of Class 11 warehousing,
surface car parking, a hotel, leisure facility (including 5-a-side-football
pitches and golf driving range) and a car showroom/workshop/petrol
filling station was subject of an appeal against the non-determination
by the former Renfrew District Council.  The appeal was subsequently
upheld and a conditional planning consent granted on 22 February
1994. 
97/0725/PP - Planning permission granted in outline for a mixed use
development comprising hotel, licensed restaurant, class 6 (six)
storage and distribution, 5-a-side soccer ground, golf driving range,
petrol filling station and allotments with new access and associated
infrastructure and landscaping on 17 December, 1999. A number of
related reserved matters applications have also been approved under
the umbrella of the original outline consent to purify conditions and
achieve consent for detailed matters such as siting, design, layout,
landscaping, access and materials for the various component parts of
the overall scheme. 
02/1304/PP - Mixed use development comprising hotel, licensed
restaurant, Class 6 warehousing, 5-a-side soccer ground, golf driving
range, petrol filling station and allotments with new access and
associated infrastructure and landscaping (reserved matters No. 1
application for outline planning permission re.  97/0725/PP). Granted
subject to conditions March 2003. 
02/1338/PP - Mixed use development (reserved matters no. 2
application for 140 bedroom hotel to include increased leisure
facilities).  Granted subject to conditions July 2003.
Page 96 of 138

Page 103

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
02/1339/PP - Mixed Use development (reserved matters no. 3
application for landscaping works and drainage/sewerage works).
Granted subject to conditions December 2003. 
02/1340/PP - Mixed use development (reserved matters no. 4
application for relocation of licensed restaurant as alternative to earlier
position shown in 02/1304/PP).  Granted subject to conditions May
2003. 
02/1341/PP - Mixed use development (reserved matters no. 6
application for relocation of petrol filling station). Granted subject to
conditions June 2003 
02/1342/PP - Mixed use development (reserved matters no. 5
application for 140 bedroom hotel).  Granted subject to conditions July
2003. 
02/1343/PP - Mixed use development (reserved matters no. 8
application for road infrastructure works) to open up Middleton
Road to through traffic. Granted in part June 2004. 
02/1344/PP - Mixed use development (reserved matters no. 7
application for floodlit 5-a-side football pitches (9 no.) together
with associated changing facilities). Granted subject to
conditions June 2003. 
04/0786/VR - Variation of condition 7 of outline planning permission
97/0725/PP to enable the commencement of construction works for:-
(a) site access road from A726 to first roundabout within the site, and
(b) erection of petrol filling station
prior to the completion of infrastructure works at St James Interchange
as detailed in the Dougall Baillie Associates drawing no. 8008/SK/04
dated June 1999.  Granted subject to conditions August 2004. 
06/0031/PP - Mixed use development comprising storage and
distribution, leisure/hotel, residential, hospital (ACAD facility) and
hotel/restaurant/public house and erection of advertising feature.
Granted subject to conditions May 2008. 
06/0033/VR - Partial deletion of condition 1. Granted subject to
conditions April 2005.   
06/0435/PP - Erection of residential development and formation of
access roads. Refused June 2010. 
18/0638/PP - Erection of mixed use development comprising
residential (Class 9), hotels (Class 7), pub/restaurant (Sui
Generis/Class 3), business (Class 4), general industrial (Class 5),
storage and distribution (Class 6) and long stay car parking with
associated access, infrastructure, landscaping and miscellaneous
works (in principle). Granted subject to conditions, March 2019.
Page 97 of 138

Page 104

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
 
CONSULTATIONS Chief Executive’s Service (Roads Development) – Object to the
site’s lack of connectivity. Comments also made regarding access and
parking. 
Chief Executive’s Service (Development Plans & Housing
Strategy) – No objections. 
Communities & Housing Services (Environmental Protection
Team) – No objections subject to conditions requiring mitigation in
relation to aircraft and railway noise and the submission of a
verification report to confirm all agreed mitigation measures in relation
to site contamination are undertaken. 
Children’s Services – Object to the development on the grounds that
existing schools serving the area currently lack capacity. The
capacities of St Andrew’s Academy and St Fergus Primary School are
both currently above 85%. 
Glasgow Airport Safeguarding – do not object to the proposed
development. Comments have been made in relation to impacts from
aircraft noise and landscaping. They advise that the proposed housing
would be sited within an area where the 57dB aircraft noise contour is
exceeded and that the landscaping proposed may increase the
potential for “bird strike" in respect of passing aircraft. 
Health and Safety Executive – No objection 
NATS – No objection. 
Network Rail – No objection subject to advisory guidance that prior to
development commencing details regarding certain aspects in relation
to construction are submitted to Network Rail’s Asset Protection
Engineer for approval. 
Scottish Water – No objection. 
Transport Scotland – No objection. 
Informative to be added: Not applicable 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations 
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan 
Page 98 of 138

Page 105

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
National Planning Framework 4
Policy 1 – Tackling the climate and nature crises
Policy 2 – Climate mitigation and adaptation
Policy 6 – Forestry, woodland, and trees
Policy 9 – Brownfield land, vacant and derelict land, and empty
buildings
Policy 13 – Sustainable transport
Policy 14 – Design, quality, and place
Policy 15 – Local living and 20 minute neighbourhoods
Policy 16 – Quality Homes
Policy 18 – Infrastructure first
Policy 22 – Flood risk and water management
Policy 24 – Health and Safety 
Renfrewshire Local Development Plan 
Policy E3 – Transition Areas (Development Opportunity Site)
Policy P1 – Renfrewshire’s Places
Policy P2 – Housing Land Supply Sites
Policy P3 – Housing Mix and Affordable Housing
Policy I1 – Connecting Places
Policy I3 – Flooding and Drainage
Policy I7 – Zero and Low Carbon Buildings
Policy I8 – Developer Contributions
Policy ENV2 – Natural Heritage
Policy ENV5 – Air Quality 
New Development Supplementary Guidance 
Delivering the Places Strategy
Delivering the Infrastructure Strategy
Delivering the Environment Strategy 
Material Considerations
Renfrewshire’s Places Residential Design Guide – March 2015
Scottish Government publications on Designing Streets and Designing
Places 
PLANNING
ASSESSMENT
Section 25 of the Town and Country Planning (Scotland) Act requires
decisions on planning applications to be made in accordance with the
Development Plan unless material considerations indicate otherwise.
The Development Plan comprises the National Planning Framework 4
(2023) and the adopted Renfrewshire Local Development Plan (2021). 
The fourth National Planning Framework (NPF4) provides the long-
term national spatial strategy for planning in Scotland. It sets out the
Scottish Government's current view on delivering sustainable, liveable
and productive places through the application of spatial principles. 
Policy 16 (Quality Homes) of NPF4 states that development
proposals for new homes on land allocated for housing in the Local
Development Plan shall be approved. In this respect, planning
permission in principle has previously been granted for residential
Page 99 of 138

Page 106

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
development at the site subject to a condition that the extent of
residential development would cover a maximum of 10 hectares site
area or 250 units, whichever is the lesser. The proposal in this case is
for 180 units over an area of approximately 6.7 hectares and therefore
accords with this condition. 
The application site is designated in the Adopted Renfrewshire LDP
as a Housing Land Supply Site under which Policy P2 of the LDP
applies. Additionally, the wider area containing the Housing Land
Supply Site is also designated as a Transition Area, under which
Policy E3 is applicable. Policy P2 and associated Appendix 1 identify
the site as having a capacity for 150 dwelling units, while Policy E3
outlines a range of additional uses appropriate in the wider Transition
Area including business, general industry, storage and distribution,
hotels, leisure uses, educational facilities and other commercial uses
of appropriate scale. 
While the proposal for 180 units exceeds the figure of 150 quoted in
Appendix 1, it is less than the maximum 250 allowed under the
planning permission in principle consent, and the site area of the
residential development is also less than the maximum allowable site
area of 10 hectares for the residential element. The proposal is
therefore compatible with the planning permission in principle consent
for Policies 16, P2 and E3 referenced above. Additionally, parts of the
site constitute previously developed land, having accommodated
previous housing. As such, redevelopment of these areas is also
generally supported by Policy 9 (Brownfield Sites) of NPF4. 
The applicant has also provided a supporting statement in relation to
affordable housing which has been assessed by the Chief Executive’s
Service (Development Plans & Housing Strategy section) as
delivering a sufficient range and choice of housing types in
accordance with Policy P3 of the Adopted LDP. In this regard, it is
commented that these range from smaller starter units through to
larger family homes and also address a recognised need to alter the
housing tenure and bring more families into the wider area. It is also
noted that the house price range would allow for low-cost housing
without subsidy which is compliant with Policy P3, while there is
considered to be sufficient social rented homes in the surrounding
area such that new build private, low cost home ownership would be
supported. The development is therefore considered to accord with
Policy 16 of NPF4 and Policy P3 of the LDP in delivering an
acceptable range and choice of housing to the area. 
Notwithstanding the above considerations, Children’s Services have
objected to the current application on the grounds that there is no
educational capacity to accommodate the additional pupils that would
be generated by the development. In this regard, it is advised that St
Andrew’s Academy and St Fergus Primary School which serve the
area are both operating above the acceptable threshold of 85%
capacity. The objection received from Children’s Services notes that
St Andrew’s Academy is operating at 118% capacity while St Fergus
Page 100 of 138

Page 107

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
Primary School is operating at 97% capacity. Childrens Services have
estimated that the proposed development would generate 9 pupils to
the secondary school and 16 pupils to the primary school. To address
the impact on school pupil numbers the applicant has been invited, in
accordance with Policy 18 (Infrastructure First) of NPF4 and Policy
I8 of the LDP, to enter into a legal agreement under section 75 of the
Town and Country (Scotland) Act 1997 for the purpose of securing a
financial contribution towards education provision. In this respect,
Policy 18 of NPF4 states that development proposals will only be
supported where it can be demonstrated that provision is made to
address the impacts on infrastructure, while Policy I8 of the LDP
states that developer contributions will be sought to address
infrastructure deficits and/or shortfalls in infrastructure capacity that
arise as a direct result of new development. The applicant has
confirmed that they are not prepared to enter into any such
arrangement. 
The applicant advises that the matter of education provision and any
potential for developer contributions is a point of principle which
required to be, and was, considered at planning permission in
principle stage, and is not a matter of design detail which is covered in
the conditions to be addressed under any subsequent application for
approval of matters subject to condition. They also point out that the
report of handling for the planning permission in principle consent had
stated that there “is no issue with educational provision for the
residential element of this application”, having noted that capacity for
school pupils had been assessed at the time of the Adopted
Renfrewshire Local Development Plan 2014 under which the site had
been designated as a Housing Action Programme Site.  
A legal opinion has also been submitted on behalf of the applicant
which supports the applicant’s view that school capacity was
considered at the time of the planning permission in principle
application and that it was not a matter reserved by condition. As the
planning permission in principle allows for up to 250 homes, the
submission advises that the Council should therefore have factored
this into their school roll forecasts and it should already be included
within the existing school capacities.
While the applicant’s position is acknowledged, the objection raised by
Children’s Services is a material consideration. In addition, it is also of
significance to note that legal advice offered to the Planning Authority
in respect of similar cases to that subject to this report notes that it is
reasonable for the provision of education to be considered in respect
of an application for the approval of matters specified in conditions.  In
this context, it is not considered reasonable to grant a residential
development of this size given current educational capacity issues
and the objection of Children’s Services without this matter being
addressed by the applicant. 
In terms of the other aspects of this application, the individual matters
outlined in Condition 2 are considered in turn below:
Page 101 of 138

Page 108

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10
 
(a) the siting, design and external appearance (including details of
materials to be used) of all buildings and other structures
within the site
Policy 14 (Design, Quality and Place) of NPF4, Policy P1 of
the LDP and the Renfrewshire New Development
Supplementary Guidance and Residential Design Guide seek
to promote well designed developments that makes successful
places. The dwellinghouses in this case would be of an
appropriate mixture of house types and designs which would
be suitably spaced, oriented and designed to offer streets
which would be suitably visually attractive. The properties
would in this regard feature a mixture of finishing materials,
with two different colour schemes proposed which would
complement each other and add visual interest to the
development. The general layout and the design and finishings
of the properties, together with the proposed landscaping and
greenspaces, would lend the development an identity and
visual quality.
Since the original planning permission in principle consent,
today’s adopted LDP has introduced a requirement under
Policy I7 that new housing, in meeting building standard
energy requirements, must install technology that produces
low or no amounts of carbon dioxide emissions, to reduce
predicted emissions by at least 15% below 2007 building
standards. This also supports one of the key objectives of
NPF4 and particularly Policy 1 (Tackling the Climate and
Nature Crises) and Policy 2 (Climate Mitigation and
Adaptation). In the event that planning permission should be
granted, it is considered that the final specifications of these
technologies could be subject to condition. 
(b) the details of; and timetable for, the hard, soft and water
landscaping of the site
Landscaping plans have been submitted which indicate the
planting of some 153 trees including native species such as
alder and silver birch and a range of cultivated species
including fastigiate birch and fastigiate hornbeam, with a range
of shrubs, hedgerows and areas of green space also lending
appropriate setting and visual amenity to the wider
development. A suitable variety of hard surface is also
proposed, with tarmac and different colours of block paving
providing for a hierarchy of roads within the development, plus
whin dust footpaths within the areas of green space. A SuDS
detention basin is also proposed at the south-west of the site
for the treatment of surface water from the development. 
Page 102 of 138

Page 109

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11
 
Glasgow Airport Safeguarding raised a holding objection in
order to clarify aspects of the proposed detention basin and
also the high proportion of hawthorn in the scheme of
landscaping due to concerns that these could attract flocking
birds which could in turn affect the passage of aircraft. While
these aspects have not been addressed, it is considered that
in the event of the application being approved, they could be
mitigated by an appropriate planning condition.
(c) the design and location of all boundary walls and fences,
including along the boundary with Network Rail's land
The proposed boundary treatments throughout the
development are considered appropriate. These include a
mixture of 1.8m high timber fencing and lower 0.75m high post
and rail fencing along the side and rear boundaries of the
plots, while the applicant has also agreed to add a more
durable boundary treatment around some of the more
prominent plots, with fencing panels separated by stone piers
featuring facing bricks. These specifications are considered
acceptable. Network Rail have also confirmed their
acceptance of the proposals.
(d) the provision of drainage works
These details have been submitted in conjunction with a
Drainage Impact Assessment required by Condition 4. It is
considered that the level of detail is sufficient in demonstrating
that the drainage from the development would be appropriately
addressed. This matter is also considered in further detail
below under Condition 4.
(e) the disposal of sewage
These details have also been submitted in conjunction with the
Drainage Impact Assessment required by Condition 4 and are
considered acceptable. The information demonstrates that foul
drainage would be collected from each individual property via
piping which would then connect to the existing combined
sewer to the south of the site. Scottish Water have confirmed
no objection to the development.
(f) the submission of a detailed survey showing the location and
nature of all trees and hedges within the site
An arboricultural assessment by professional arborists has
been submitted which finds that much of the derelict site to the
east has become naturalised by woodland containing trees of
a diameter of up to 35cm. Trees mostly comprise goat willow,
with silver birch and hawthorn also present. Further west is
more scrubby, younger woodland with goat willow dominant,
while three standalone trees have also been surveyed and
Page 103 of 138

Page 110

Renfrewshire Council Planning and Climate Change Policy Board 
Page 12
 
classified as of low quality. No TPOs or other statutory
designations are in place. 
While some notable areas of treecover would be cleared to
accommodate the development, no individual trees or
woodland of outstanding quality have been identified, while
new planting has been identified within the scheme of
landscaping. Given the limited quality of the treecover on site
and the landscaping proposed, the development is considered
to comply acceptably with Policy 6 (Forestry, Woodland and
Trees) of NPF4 and Policy ENV2 of the LDP.
(g) access and parking arrangements, including the provision of
any new roads and junctions
The Chief Executive’s Service (Roads Development) has
objected to the proposal’s lack of connectivity and in particular
to West March Road which is shown on the indicative
masterplan approved with the planning permission in principle
application. The applicant has advised that this access has
been omitted as no condition on the planning permission in
principle application was imposed to provide this connection.
The applicant was encouraged to consider a further access
into the site at the north end to allow greater permeability
through the development and to remove reliance on the
development’s only access from Ferguslie Park Avenue to the
south. It is considered that such a measure would enable the
development to integrate better with the surrounding area and
accord in this respect with the Scottish Government’s
Designing Streets Policy which encourages developments
with multiple accesses rather than cul-de-sacs. The principle of
this approach is also considered to accord with Policy 14
(Design, Quality and Place) of NPF4 and Policy P1 and Policy
I1 of the LDP. 
While discussions with the applicant indicated an initial
willingness from them to accommodate such an access, they
have not submitted any follow-up proposal or pursued any
further discussions on this matter. It is considered that this
issue could be addressed relatively easily with an additional
access point into the development added from the north. In
view of the objection from Roads Development and lack of any
alternative scheme submitted to enable connectivity from the
north, it is not considered that the current access arrangement
can be supported. 
Within the development itself, suitable pedestrian routes are
proposed, including footways, shared surfaces and additional
footpaths across areas of open space including the central
amenity area. These provisions are considered to generally
Page 104 of 138

Page 111

Renfrewshire Council Planning and Climate Change Policy Board 
Page 13
 
accord with Policy 13 (Sustainable Transport) of NPF4 and
Policy I1 of the LDP. The applicant has also been encouraged
to form additional pedestrian/cycle connections to link the
development to the south but advise that they are unable to
entertain such connections due to a lack of control over the
land to the south and the extent of disturbance that would be
required to the former railway embankment. However,
footways would be provided alongside the one access road
into the site which would in turn connect with the existing
footway on Ferguslie Park Avenue which is also a designated
core path.
(h) the layout of the site
As noted above, the applicant has elected not to add any
additional vehicular access into the development. The layout
would otherwise be characterised by a series of
interconnecting streets with areas of green space, including a
play area at the north of the site. Plot sizes and gardens would
vary in size and would in some cases be relatively small but
would still allow for an acceptable depth of at least 9 metres as
well as private open space to plot ratios which would generally
be commensurate with the recommendations outlined in the
Renfrewshire Council Residential Design Guidance. Properties
would also be appropriately positioned in relation to each to
result in minimal overlooking or overshadowing. 
The development would be physically isolated from other
residential areas, with the bund along its southern edge and a
strip of further open space separating it from Ferguslie Park
Avenue to the south. However, the adjoining area to the south
of the bund is noted to be Council-owned and therefore offers
opportunity for future integration with the wider Ferguslie Park
area which is currently subject to various ongoing regeneration
activity. A local place plan has also been established by the
local community which identifies the application site area as
derelict/vacant land appropriate for development, with the
bund also identified as having the potential to contribute to a
multifunctional “green high line” serving the wider area. As
such, it is considered that the development could potentially
benefit from future plans to improve integration within the wider
area and local services and contribute to local living and the
‘Place Principle’ promoted by Policy 15 of NPF4. 
(i) a Site Investigation report (characterising the nature and
extent of any soil, water and gas contamination within the site);
and, if remedial works are recommended therein
A Site Investigation report by consultants on behalf of the
applicant has been submitted and reviewed as acceptable by
Page 105 of 138

Page 112

Renfrewshire Council Planning and Climate Change Policy Board 
Page 14
 
contaminated land specialists within the Council’s
Communities & Housing Services (Environmental Protection
Team) following clarification on certain technical aspects. The
report identifies a number of sources of contamination which
will require remediation works prior to development
commencing.
(j) a Remediation Strategy and Implementation Plan identifying
the proposed methods for implementing all remedial
recommendations contained with the site investigation report
prepared in accordance with current authoritative technical
guidance, has been provided by the Planning Authority;
A Remediation Strategy and Implementation Plan by the same
consultants has also been submitted. This sets out proposed
measures for addressing the issues of contamination identified
in the Site Investigation report. As with the Site Investigation
report, the Remediation Strategy and Implementation Plan has
been reviewed by Communities & Housing Services
(Environmental Protection Team) and confirmed by them as
acceptable following clarification on certain technical aspects.
The document includes measures for addressing Polycyclic
Aromatic Hydrocarbons (PAHs) and Asbestos Containing
Materials (ACMs) identified through the Site Investigation.
The applicant has therefore demonstrated that site
contamination can be appropriately addressed, in accordance
with Policy 9 of NPF4 and the New Development
Supplementary Guidance.
(k) a report which satisfies the Planning Authority that the Local
Air Quality Management Objectives for the pollutants specified
in the relevant Air Quality Regulations, made under Part IV of
the Environment Act 1995, shall not be exceeded at any
location at or in the vicinity of the development where 'relevant
exposure' is liable to occur. In addition, the overall significance
of the air quality impacts from the development shall be
assessed and clearly defined within the report with mitigation
proposed where required. The survey and report shall adhere
to the methods and principles set out in the Scottish
Government publication 'Local Air Quality Management
Technical Guidance LAQM.TG(16)' and the EPUK guidance
document 'Land-Use Planning & Development Control:
Planning for Air Quality (January 20017)' or a method that has
been agreed with the Planning Authority.
The applicant has submitted an Air Quality Assessment by
consultants, the findings of which have been confirmed as
acceptable by the Communities & Housing Services
(Environmental Protection Team). The assessment outlines
Page 106 of 138

Page 113

Renfrewshire Council Planning and Climate Change Policy Board 
Page 15
 
the results of a model to investigate both whether there is
potential for traffic from the development to impact on the air
quality of existing residents in the nearby area and whether the
air quality in the vicinity is suitable for new residents
associated with the proposed development.  On both fronts,
the model finds there to be no significant issues and concludes
that the development does not raise any material concerns
with regard to air quality. As such, the development is found to
accord with Policy 24 (Health and Safety) of NPF4 as
regards air quality and Policy ENV 5 of the LDP.
Turning to Condition 4, this required the submission and approval of a
Drainage Impact Assessment (DIA). The submitted DIA outlines that
foul drainage would be routed to the existing combined sewer to the
south of the site, while surface water would be collected and routed to
a detention basis to the south-west of the site where it would be
treated and directed further west to the Candren Burn.
The DIA has been peer reviewed and subject to amendments to
clarify certain aspects of its findings the updated DIA is found to be
acceptable. It is therefore considered that drainage from the
development can be successfully accommodated in accordance with
Policy 22 of NPF4 and Policy I3 of the LDP.
Condition 6 refers to the submission and approval of a Noise Impact
Assessment (NIA). In this respect, the applicant has submitted a
report outlining the findings of a noise and vibration survey which
considers the impact of existing external noise on the proposed
houses from road and railway traffic in the area, as well as from noise
associated with aircraft from the nearby airport. Measurements are
also included with respect to vibration from the adjacent railway to the
north-east. The report also considers the likely impact on the housing
of the other non-residential elements allowed under the planning
permission in principle approval for the wider site including the hotel,
restaurant/public house, industrial, storage & distribution and long stay
car park uses.
Communities & Housing Services (Environmental Protection Team)
have considered the findings of the report and confirmed no objection
subject to conditions to ensure particular glazing standards to mitigate
noise impact within the properties. However, they have advised that it
is not possible to recommend any conditions or mitigation to address
the impact of aircraft noise on external areas such as gardens. 
Glasgow Airport have noted with reference to their most up to date
‘Actual’ noise contours based on 2017 data that the residential
development is located within an area where aircraft noise levels are
in excess of 57dB LAeq. While they do not formally object to the
development, they point out that the New Development
Supplementary Guidance on Noise states that “residential
Page 107 of 138

Page 114

Renfrewshire Council Planning and Climate Change Policy Board 
Page 16
 
development should avoid areas where aircraft noise levels are in
excess of 57dB LAeq” and that “applications for residential
development will be refused unless a noise assessment and noise-
insulation measures can demonstrate that an appropriate level of
residential amenity could be achieved”. 
At the time that planning permission in principle was granted, the
previous 2011 noise contours provided the most up to date official
noise data. Under the 2011 noise contours, the development was
entirely outwith the 57dB noise contour and was therefore compliant
with the guidance. In the period since planning permission in principle
was granted, the 2017 noise contours have been adopted as the most
up to date “actual” noise data and the development is no longer
situated outwith the 57dB threshold given the shift in the noise
contours. However, as neither Glasgow Airport nor the Communities &
Housing Services (Environmental Protection Team) have objected to
the development on noise grounds, and the latter have accepted the
mitigation measures proposed, the submitted Noise Impact
Assessment is considered to sufficiently satisfy the requirement of
Condition 6 of the planning permission in principle consent. 
In summary, whilst it is considered that the development can
contribute to the wider area in addressing varied housing needs in the
Ferguslie Park area, given the lack of school capacity and objection
from Children’s Services and that the applicant has elected not to
address this matter, it is not considered reasonable to support the
development at this current time. Furthermore, as the Chief
Executive’s Service (Roads Development) has objected and the
applicant has elected not to include any alternative access into the
site from the north, the site layout in relying on a single access from
the south is not considered to comply with prevailing policy in terms of
connectivity and integration of the development into the surrounding
area. It is therefore recommended that consent is refused.
RECOMMENDATION Refuse
 
Reason for Decision
1. That the proposed development will result in an unacceptable impact on educational
infrastructure due to the current capacity of St Andrew’s Academy and St Fergus
Primary School both exceeding 85% capacity. The proposed development is therefore
considered to be contrary to Policy 18 of the Fourth National Planning Framework and
Policy I8 of the Renfrewshire Local Development Plan as no mitigation has been
provided for this impact.
2. That the development does not provide suitable integration and connectivity with the
surrounding area given its reliance on a single access point from Ferguslie Park Avenue
to the south and is therefore considered contrary to Policy 14 of the Fourth National
Page 108 of 138

Page 115

Renfrewshire Council Planning and Climate Change Policy Board 
Page 17
 
Planning Framework and Policy P1 and Policy I1 of the Renfrewshire Local
Development Plan. 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact Andrew MacKenzie on 0141 487 1375 
Page 109 of 138

Page 116

Page 110 of 138

Page 117

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0574/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley North
West 
Applicant: Springfield
Properties PLC 
Registered: 12.08.2022 
 
RECOMMENDATION 
Refuse 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of a residential
development comprising 45 flats with associated access,
parking, and landscaping. 
LOCATION: Site Between Abbeyfield House and Ivy
Gardens, Station Road, Paisley 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The application site is largely made up of grassed
open space and is designated under Policy P1 of
the Adopted Renfrewshire Local Development Plan
where there is a general presumption in favour of a
continuance of the built form. 
 There have been 15 letters of representation. 
 There have been no objections from any
consultees. 
 
 
Alasdair Morrison
Head of Economy &
Development
Item 9(b)
PACC190324 Page 111 of 138

Page 118

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 22/0574/PP 
SITE ADDRESS  Site Between Abbeyfield House and Ivy Gardens, Station Road,
Paisley 
PROPOSAL  Erection of a residential development comprising 45 flats with
associated access, parking, and landscaping. 
RECOMMENDATION Refuse 
PROPOSALS This application seeks planning permission for a residential
development comprising of 45 flats with associated access, parking,
and landscaping on an area of open space adjacent to the roundabout
junction between Station Road and Ferguslie. 
The application site extends to approx. 0.37 hectares in area. It is
bound by Station Road to the west, the roundabout to the north west,
Ferguslie to the north, a care home and residential properties to the
east, and open space to the south. The site primarily comprises of
maintained grassland, with a small pocket of shrubs along the
northern boundary and a larger group of shrubs and trees in the south
west corner. 
The proposed development is for 45 affordable flats specifically
designed for occupation by ambulant disabled. The flatted block is
positioned along the western boundary of the site. It has a flared V
shaped footprint, and extends to 5 storeys in height at the north west
corner (fronting the roundabout) before dropping to 4 storeys in height
towards the south west corner (fronting Station Road). External
materials predominantly comprise of light and dark grey facing brick
with sections of metal and timber cladding. The mono pitched roof is
finished in single ply membrane. 
The eastern half of the site accommodates the access, parking, and
bin storage areas. Parking is developed around the existing Station
Road layout, and access to the care home and residential properties
will be maintained. There are 45 parking spaces proposed. 
It is noted that concern was initially raised with the applicant in
October 2022 regarding the height, scale and design of the building
and the potential over development of the site. It was indicated at that
stage that the scale of development on John Neilson Avenue (on the
opposite side of Ferguslie to the north of the site) would be more
appropriate for the site. 
The applicant has advised that a reduction in height and associated
loss of units would render the development unviable. On this basis the
applicant sought to justify the height, scale, and design of the building
via the submission of further supporting information including visuals.
It is also noted that the building has been pulled back from the site
edge at the south western and northern boundaries to provide greater
separation between the building and the road.  
Page 112 of 138

Page 119

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
This application constitutes a local development that falls within the
scheme of delegation for determination by officers. However, given
the type of housing accommodation proposed and the design of how
this would be delivered it is considered appropriate to present the
application to the Planning and Climate Change Policy Board. 
SITE HISTORY Application No. 01/1192/PP
Description. Alterations and extensions forming care homes and
provision of daycare centres.
Decision. Grant, subject to conditions 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – No objections subject to conditions relating to the submission
of a noise impact assessment (NIA), control of noise emanating from
plant and machinery, and submission of a site investigation report. It is
noted that an NIA was subsequently submitted and approved subject
to a condition relating to submission of a final specification for the
windows. 
Chief Executive’s Service (Roads Development) – No objections
subject to conditions relating to installation of a staggered crossing on
Ferguslie, improvements to the splitter island on Station Road,
upgrading the footway to 3m width along the frontage, improving
pedestrian connectivity within the car park, and the access
arrangement at the point where the entrance to the car park and the
access to the properties at Weavers Gate converge. 
Childrens Services – No objections made. 
Glasgow Airport Safeguarding – No objection subject to condition
relating to the submission of a Bird Hazard Management Plan, and an
advisory note relating to the potential use of cranes. 
NATS – No objections. 
Scottish water – No objections. 
Informative to be added:  Yes   
REPRESENTATIONS  15 letters of representation have been received which all object to the
proposed development. The points raised in the letters can be
summarised as follows. 
1 – Behaviour of those occupying the development if it is for
affordable housing.
2 – Parking provision.
3 – Over development of area
4 – Loss of trees, open space, and impact on wildlife
5 – Noise, disruption and dust associated with construction phase
6 – Traffic and road safety, loss of sightlines.
7 – Design is out of keeping with the area
Page 113 of 138

Page 120

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
8 – Scale, height and materials are out of character with surrounding
area
9 – Impact on setting of listed building
10 – Overshadowing and loss of daylight
11 – Loss of privacy
12 – Provision for refuse storage and collection
13 – Flooding
14 – No play area provision
15 – Requirement for developer contributions 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan 
National Planning Framework 4 
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 3 - Biodiversity
Policy 4 - Natural places
Policy 6 - Forestry, woodland and trees
Policy 7 - Historic assets and places
Policy 9 – Brownfield, vacant and derelict land and empty buildings
Policy 13 - Sustainable transport
Policy 14 - Design, quality and place
Policy 15 - Local Living and 20 minute neighbourhoods
Policy 16 - Quality homes
Policy 18 - Infrastructure first 
Renfrewshire Local Development Plan 
Policy ENV2 - Natural Heritage
Policy ENV3 - Built and Cultural Heritage
Policy I1 - Connecting Places
Policy I7 - Zero and Low Carbon Buildings
Policy I8 - Developer Contributions
Policy P1 - Renfrewshire's Places
Policy P3 - Housing Mix and Affordable Housing
Policy P6 - Open Space 
New Development Supplementary Guidance 
Delivering the Environment Strategy
Delivering the Places Strategy
Delivering the Infrastructure Strategy 
Material Considerations 
Page 114 of 138

Page 121

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
Renfrewshire’s Places Residential Design Guide – March 2015 
PLANNING
ASSESSMENT
Policy P1 of the Local Development Plan (LDP) states that within
uncoloured areas on the proposals maps there will be a general
presumption in favour of a continuance of the built form. New
development proposals within these areas should make a positive
contribution to the Place and be compatible and complementary to
existing uses. 
It is recognised that the site currently comprises of open space and
has an amenity and recreational value on this basis. Whilst not
formally designated under Policy P6, the provisions of the
supplementary guidance on open space nevertheless apply. The
guidance states that areas of open space not shown on the proposals’
maps, including small areas of recreation and amenity space, will be
protected from development unless certain criteria are satisfied. 
The proposed development is not for recreational or physical activity
and will ultimately result in the loss of the area of open space.
However, the specific nature of the residential development being
proposed will bring public benefit via delivery of affordable
accommodation which is specifically designed for occupation by
ambulant disabled. There is a growing demand for this type of
accommodation, and delivery complies with Policy P3 of the LDP
which relates to provision of a mix of housing types and tenures. 
In terms of the net loss of open space, it is noted that there are
pockets of open space to the south of the site adjacent to Station
Road. Additionally, Ferguslie Gardens is approximately a 10 minute
walk to the north east of the site. On this basis there is alternative
provision of open space in the surrounding area, and the development
will not lead to a significant net loss of open space. 
In addition to the above it is noted that the site occupies a prominent
location adjacent to a busy roundabout. While the open space has
amenity value, the development of the site could also contribute
positively to the area by enhancing the built form around the
roundabout. This approach would also align with the National
Planning Framework 4 spatial principle of delivering compact urban
growth. 
It is also significant to note that the Council has previously approved
development on this site, namely application 01/1192/PP for
development associated with the extension of the adjacent care
home. For the purposes of the aforementioned application the Council
viewed the site as being brownfield in nature i.e. previously
developed. Previous historical development in this area is also
illustrated in the supporting Design and Access Statement. Policy 9
within NPF4 seeks to promote development on brownfield land. 
Whilst the current use of the land is acknowledged, the brownfield
considerations, historical past use of the site and the previous grant of
Page 115 of 138

Page 122

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
planning permission are material to the assessment of any proposed
development. 
Taking the above into consideration, I am satisfied that on balance the
proposed development of the site is acceptable in principle as it
accords with the provisions of Policy P1 and P3 of the LDP, Policy 9
of NPF4 and the associated spatial strategy which in this instance
outweigh the provisions of Policy 4 of NPF4, Policy P6 of the LDP
and the supplementary guidance on open space. 
While development of the site is considered to comply with the above
policies in principle, detailed consideration as to the nature, design,
scale finish of the development is required to determine whether it
complies with these policies in full. Detailed consideration of the
proposed development is therefore undertaken below with respect to
the provisions of the New Development Supplementary Guidance and
the Residential Design Guide. 
These documents set out a range of considerations that form the
basis of good places design. Each consideration will be assessed in
turn.   
Context and Character 
The application site is in a prominent location fronting the roundabout
junction between Ferguslie and Station Road. Ferguslie is a busy
arterial route towards Paisley town centre which is approx. 1.5km to
the east. 
The surrounding built form is residential in nature, and characterised
by a mix of building scales and designs. To the north of the site on the
opposite side of Ferguslie there are three storey flats on John Neilson
Avenue. To the east of the site is the two storey care home. To the
south east there are residential properties on Weavers Gate which
comprise of a 1.5 storey row of terraced properties which are C listed,
and a three storey block of flats. To the west of the site is Ivy Gardens
which predominantly comprises of two storey dwellinghouses. It is
noted that the planning permission for this development also included
3 storey flats at the Station Road entrance to the site.     
Access and Connectivity 
The application site is sustainably located regarding proximity to
amenities. The mobility of the end user of the development must be
considered in this regard, and it is noted that the flats include
dedicated areas for charging mobility scooters. Nearby amenities that
could still be accessed include a parade of retail units on Ferguslie
approx. 400m away and the ALDI on Fulbar Street approx. 600m to
the west of the site, and Ferguslie Bowling Club and Ferguslie
Gardens approx. 500m to the east of the site.  
The site has good accessibility to public transport which runs along
Page 116 of 138

Page 123

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
Ferguslie, and provides onward connections to Paisley town centre.
Accessibility would be further improved via the installation of a
controlled crossing point on Ferguslie as requested by Roads
Development. Upgrading of the splitter island on the Station Road arm
of the roundabout would also improve pedestrian movement to the
west of the site. 
In view of the above it is considered that the development would
support the principles of local living advocated by Policy 15 of NPF4.
Additionally, the new crossing and splitter island upgrades would
enhance connectivity in accordance with Policy 13 of NPF4 and
Policy I1 of the LDP. 
The internal site layout accommodates 45 vehicle parking spaces.
This level of provision is acceptable given the nature of the
development. The building includes a front access which connects
directly to the pedestrian network, and a rear access into the car park.
Provision has been made within the layout for pedestrian movement
through the car park, including retention of an existing footway. 
Roads Development have asked for further detail of the delineation of
space at the access to make priorities clearer. It is noted that the
access point is shared with Weavers Gate. They have also asked for
the footway fronting the site to be widened to 3m. These matters could
be addressed via condition.   
Layout and Built Form 
The building is positioned in the western half of the site to provide an
active frontage onto Station Road and Ferguslie. The proposed layout
provides separation between the building and the existing properties
to the east and north and the consented flats within Ivy Gardens to the
west. The car parking in the eastern half of the site will be partially
screened from external view by the building. 
While the layout has been amended slightly with the building set
further back from the site frontage, the landscape buffer between the
building and the footway is still considered to be limited given the
scale of the building. It is noted that the width of the buffer could be
eroded further given the request from Roads Development to widen
the footway. It is noted that the layout specifies resident garden space
to the rear of the building, and that this is supplemented by outside
terraced areas within the flats. However, on balance the building
footprint and associated parking are dominant and appear to over
develop the site. 
Environment and Community 
The proposal includes an indicative scheme of landscaping which will
provide a setting for the building, create an attractive edge along the
key frontages, and compensate for the removal of the existing tree
and shrub coverage on the site. The existing vegetation is not
Page 117 of 138

Page 124

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
considered to be of exceptional value and would not require retention
as part of the development. 
A detailed landscaping scheme could be requested via condition. This
could include provision for a biodiversity management plan to ensure
that the development delivers a biodiversity gain at the site in
accordance with Policies 3 and 6 of NPF4 and Policy ENV2 of the
LDP. 
The submission includes a drainage strategy which specifies drainage
of surface water via a surface water sewer network to the south of the
site in the vicinity of the Candren Burn and the old Ferguslie Canal. A
condition could be attached to require the developer to demonstrate
that the drainage strategy has been approved by Scottish Water
and/or SEPA and to agree an alternative strategy if required. It is
noted that Scottish Water have not objected to the number of units
being proposed in terms of water supply and foul network capacity. 
There is no requirement for play provision or an education contribution
given the proposed end users of the development. The proposal is not
therefore considered to raise any infrastructure or developer
contribution requirements with respect to Policy 18 of NPF4 and
Policy I8 of the LDP.   
The Environmental Protection Team have approved the Noise Impact
Assessment and have requested a condition to ensure the
recommended insulation standards set out within the assessment are
met. 
The applicant has submitted an energy strategy which sets out a
range of proposed energy efficiency measures. A condition could be
applied to ensure the building is developed in accordance with this
strategy as per the requirements of Policy I7 of the LDP. 
The building has been positioned to ensure there are no detrimental
impacts on neighbouring properties with regard to overlooking or
overshadowing. 
There is a separation distance of at least 37m between the building
and the properties on John Neilson Avenue. This ensures privacy will
not be impacted. The distance is also sufficient to ensure these
properties will not be overshadowed. 
To the west the consented flats at Ivy Gardens are set back from
Station Road behind a car park. The separation distance is therefore
in excess of 18m, and will ensure that there is no loss of privacy
between the developments. The separation distance also ensures
there will be no overshadowing. 
The nearest property at Weavers Gate is approx. 27m from the
proposed building. This separation distance is sufficient to ensure
there will be no detrimental impact on privacy. The position and
Page 118 of 138

Page 125

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
orientation of Weavers Gate to the south east of the development also
ensures there will be no overshadowing, and this has been
demonstrated through the sunlight analysis submitted. 
The care home directly adjoins the site to the east. However, there are
no windows on the elevation of the care home that is closest to the
boundary. The nearest windows on the care home that directly face
the proposed building are over 50m away, and this distance is
sufficient to ensure no loss of privacy. The proposed building is also
21m back from the mutual boundary, and will not give rise to
significant overlooking of external amenity space associated with the
care home. 
The sunlight analysis submitted with the application indicates that the
shadow from the proposed building will start to encroach upon the
boundary of the care home in the late afternoon. However, the
analysis shows that the minimum standard of at least 50% of garden
ground receiving at least 2 hours of sunshine on the 12th March (as
set out within the BRE 209 2022 guidance on Site Layout Planning for
Daylight and Sunlight: A Guide to Good Practice) is comfortably met. 
Some of the properties within Weavers Court are C listed, and any
potential impact on their setting must also be considered. The
properties in question are at the eastern end of Weavers Court
approx. 45m from the application site boundary and are positioned
behind a newer unlisted block of flats, a parking court and some trees.
The setting of the listed buildings predominantly derives from the
parking court area to the front of the buildings, and it is not considered
that development on the application site will have a detrimental impact
on this setting. The development therefore accords with Policy 7 of
NPF4 and Policy ENV3 of the LDP in this regard. 
Buildings and Design 
The proposed development would provide 45 affordable flats
specifically for ambulant disabled persons. Policy 16 of NPF4
provides support in principle for homes which improve choice, and
which seek to address identified gaps in provision including accessible
and adaptable homes. The development complies with Policy 16 of
NPF4. 
Policy 14 of NPF4 and Policy P1 of the LDP emphasise the delivery
of quality places through high standards of design. The building being
proposed differs in scale and appearance to the existing built form in
the area. The building is part five storey part four storey when the
predominant built form in the surrounding area is a mix of two and
three storey. The grey facing brick also differs from the roughcast and
reconstituted stone finish at John Neilson Avenue, and the roughcast
and red brick finish at Ivy Gardens. 
The height of the proposed development does not reflect the
surrounding area, and the associated scale is considered to constitute
Page 119 of 138

Page 126

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10
 
overdevelopment of the site. The scale also emphasises the
contrasting design and materials which do not represent a
continuance of the existing built form. While the applicant indicates
that the site can accommodate a ‘statement building’, it is considered
that the height and scale being proposed is incompatible with the
existing area. The proposal will have an overdominant and
unsympathetic impact on the surrounding environment in this regard. 
While it was noted above that development of the site could be
considered acceptable in principle with regard to Policy P1 and P3 of
the LDP, Policy 9 of NPF4 and the associated spatial strategy,
compliance with these policies in full was subject to further detailed
consideration of aspects such as design, scale and form. Detailed
consideration has concluded that the development will have an
overdominant and unsympathetic impact on the surrounding
environment and does not therefore fully comply with these policies. 
After detailed assessment the development is therefore considered to
be contrary to Policy 14 of NPF4, Policy P1 of the LDP, and the
Residential Design Guide which states that proposed buildings should
be of similar scale and should reflect the form of adjacent properties.   
The principle of development on the site is accepted. The benefits
associated with the specific form of residential accommodation being
proposed are also acknowledged, as is the sustainable location of the
site with regard to facilitating local living. The development could also
utilise the energy efficiency measures set out in the energy strategy.
The site location and energy efficiency should also ensure the
development aligns with policies 1 and 2 of NPF4. 
However, the height and scale of the development is out of keeping
with the existing built environment to the extent that it is considered
that it would have a detrimental impact on the place. Impact on place
is considered to be the overriding factor, and on balance it is
recommended that the application is refused on this basis. 
In response to the points raised in the letters of objection. 
1 – This is not a material planning consideration. 
2 and 6 – Roads Development have offered no objection to the
development on the grounds of parking provision, traffic or safety
subject to conditions. 
3, 4, 7, 8, 9, 10, 11, 14, 15 – These matters have been considered in
the foregoing assessment. 
5 – A construction management plan could be controlled via condition
to mitigate these potential issues associated with the construction
phase.
12. 
Page 120 of 138

Page 127

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11
 
13 – The application site is not within a flood risk area as identified by
SEPA flood risk maps. A strategy has been proposed to manage
surface water. 
RECOMMENDATION Refuse 
Reason 
1. The proposed development, by virtue of its height, scale and design, would have an
intrusive and over-dominant impact on the character of the existing built environment and
its residential amenity and would not make a positive contribution to Place. It is therefore
contrary to Policy 14 of National Planning Framework 4, Policy P1 of the adopted
Renfrewshire Local Development Plan, the associated New Development Supplementary
Guidance, and Renfrewshire Council’s Residential Design Guide. 
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666
 
 
Page 121 of 138

Page 128

Page 122 of 138

Page 129

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   23/0296/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 12 – Erskine and
Inchinnan 
Applicant: City Gate
Construction Ltd 
Registered: 02/06/2023 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Formation of car park with
associated access, landscaping and realignment of
boundary wall 
LOCATION: India of Inchinnan, Greenock Road, Inchinnan 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The application site is located within the Inchinnan
Business Park Strategic Economic Investment
Location as defined by Policy E1 of the
Renfrewshire Local Development Plan.
 The India of Inchinnan building is a category A listed
building.
 There have been no objections from consultees.
 There have been no letters of representation.   
 
 
Alasdair Morrison
Head of Economy &
Development
Item 9(c)
PACC190324 Page 123 of 138

Page 130

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 23/0296/PP 
SITE ADDRESS  India Of Inchinnan Greenock Road Inchinnan
PROPOSAL  Formation of car park with associated access, landscaping and
realignment of boundary wall 
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks planning permission for the formation of a car
park with associated access, landscaping and realignment of
boundary wall on land to the east of the India of Inchinnan building. 
The site currently comprises of maintained grassland, and extends to
0.34 hectares in area. It is bound by the India of Inchinnan building to
the west, the roundabout junction between Greenock Road and
Inchinnan Drive to the north and east, and grassland to the south. 
The India of Inchinnan building is a category A listed building. 
The proposed car park would accommodate 137 parking spaces, 17
of which would include EV charging. Provision is also made for cycle
parking. The car park will connect with the existing access road to the
front of the building. The proposals also include the formation of a
section of footway along the north-eastern boundary, and associated
landscaping. In order to ensure the proposed section of footway links
with the existing footway to the front of the building, a section of
boundary wall requires to be realigned. This realignment forms the
basis of concurrent listed building application 24/0025/LB which is
also being presented to Board today. 
It should be noted that while this application is for the car park only,
the applicant has submitted information referring to a masterplan for
the site which includes development of part of the existing car park to
the west of the building to form a joinery workshop. However, this
proposal would require to come forward under a separate planning
application and does not form part of this application. 
This report relates to an application which would normally fall within
the Council's scheme of delegation to be determined by an appointed
officer. However, a request has been submitted by three members,
within 21 days of the application appearing on the weekly list, that the
matter be removed from the scheme of delegation for determination
by the Board. It was considered that the potential impact of the
development on the local community and local environment required it
to be fully considered prior to any decision being made. 
SITE HISTORY Application No: 24/0025/LB
Description: Realignment of boundary wall.
Decision: This application is also being presented to Board today for
determination. 
Page 124 of 138

Page 131

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
Application No: 18/0377/LB
Description: Re-rendering of external walls (in retrospect).
Decision: Granted 
Application No: 17/0823/LB
Description: Internal alterations including the formation of a partition
wall, formation of kitchen area and installation of additional toilet
cubicle
Decision: Granted 
Application No: 07/0751/PP
Description: Erection of 2 no. three storey office pavilions.
Status; Granted subject to conditions 
Application No: 04/1056/LB
Description: Erection of 5 No. flagpoles on north elevation and 3 No.
flagpoles on east and west elevations.
Status; Granted subject to conditions 
Application No: 04/0980/AD
Description: Erection of 5 no. flagpoles on north elevation and 3 no.
flagpoles on east and west elevations.
Status; Granted subject to conditions 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – No comments. 
Chief Executive’s Service (Roads Development) – have no
objection subject to an update being provided by the applicant in
respect of the Active Travel Plan for the site to reflect recent and
proposed active travel infrastructure and how the gaps can be
overcome to reduce car dependency for the site in line with National
Policy. 
Glasgow Airport Safeguarding – No objections. 
Historic Environment Scotland – No comments made in respect of
the impact of the development on the setting of the listed building.
Historic Environment Scotland were consulted separately on the
realignment of the boundary wall. Advised that the proposal was
acceptable in principle, and provided a list of information that should
accompany a listed building application for the works. This
realignment forms the basis of concurrent listed building application
24/0025/LB which is also being presented to Board today. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations 
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
Page 125 of 138

Page 132

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
following: 
Development Plan 
National Planning Framework 4
NPF4: Policy 1 – Tackling the climate and nature crisis
NPF4: Policy 2 – Climate adaptation and mitigation
NPF4: Policy 3 - Biodiversity
NPF4: Policy 7 - Historic assets and places
NPF4: Policy 13 - Sustainable transport
NPF4: Policy 14 - Design, quality, and place
NPF4: Policy 22 - Flood risk and water management
NPF4: Policy 26 - Business and industry 
Renfrewshire Local Development Plan 
LDP 2021: Policy E1 - Renfrewshire's Economic Investment Locations
LDP 2021: Policy ENV2 - Natural Heritage
LDP 2021: Policy ENV3 - Built and Cultural Heritage
LDP 2021: Policy I1 - Connecting Places
LDP 2021: Policy I3 - Flooding and Drainage 
New Development Supplementary Guidance 
Delivering the Environment Strategy
Delivering the Infrastructure Strategy
Delivering the Economic Strategy 
Material Considerations 
Historic Environment Scotland Managing Change in the Historic
Environment Guidance Note on Setting 
PLANNING
ASSESSMENT
Policy E1 of the Local Development Plan (LDP) states that
Renfrewshire’s Economic Investment Locations are identified and
promoted for the development of class 4, class 5, and class 6
development as well as ancillary service provision. 
The India of Inchinnan building is located within Inchinnan Business
Park which forms part of the Advanced Manufacturing and Innovation
District Scotland economic investment location. 
The proposed car park will increase the quantity and quality of parking
available to serve the India of Inchinnan building. It is noted that the
existing parking area to the west is partly formed from an unsealed
surface and does not have delineated parking spaces. The proposal is
for a sealed surface car park with delineated spaces, EV charging and
cycle parking.   
It is noted that the submission refers to a masterplan which includes
development of the existing car park to the west. The proposed car
park would therefore compensate for the loss of the existing car park
should consent be granted.  Development of the existing car park
Page 126 of 138

Page 133

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
would require to be the subject of a separate planning application, and
no details have been provided at this stage. 
A detailed assessment of overall parking provision to serve the
existing India of Inchinnan building and any potential additional
building would also have to be undertaken as part of a future planning
application. For the purposes of this application, it is considered that
the proposed car park would complement and enhance the existing
parking provision. 
The development will support the operation of the India of Inchinnan
building. It is noted that the building has experienced periods of
vacancy. Given the importance of the building and it’s listed status,
additional infrastructure which would enhance its attractiveness to
potential occupiers and help ensure the building remains in an active
and beneficial use is welcomed in principle. This would include
improvements to the quality and quantity of parking provision. 
A key consideration in the assessment of the car park is the impact it
will have on the setting of the India of Inchinnan building. Policy
ENV3 of the LDP and Policy 7 of NPF4 both state that development
proposals within the vicinity of built heritage assets will be required to
demonstrate that there is no negative impact to their site or setting. 
The India of Inchinnan building currently benefits from an open
setting, with grassland to the east and south and car parking to the
west. The nearest neighbouring building is the Advanced Forming
Research centre which is over 100m to the south west. 
The current setting affords views of the building from all vantage
points, particularly from the south. However historically the land to the
south and west was built up with factory buildings. Additionally, the
Council has previously consented development on the land to the
south (Planning Application 07/0751/PP), and this area is still
identified as a development opportunity site within the LDP.  It is also
noted that the development is low profile and will not have a
significant impact on views of the building. A landscaping scheme can
be developed to soften the edge of the car park to ensure it
appropriately integrates into the setting of the building and this can be
controlled by a suitable planning condition. On this basis it is
considered that the proposed car park is acceptable in terms of its
impact on the building’s setting.   
Historic Environment Scotland have made no comment on the
development. 
In view of the above It is considered that the development will not
have a detrimental impact on the setting of the India of Inchinnan
building and is acceptable with respect to policies ENV3 of the LDP
and 7 of NPF4. 
The proposed development is compatible with surrounding uses, and
Page 127 of 138

Page 134

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
will not result in an overall loss of amenity within the surrounding area.
There have been no objections to the development from the
Environmental Protection Team or Glasgow Airport Safeguarding. 
The site comprises of mown grassland which has limited biodiversity
value. There will be no loss of any trees, and no unacceptable impact
on the natural or water environment. 
The proposal includes an indicative landscape scheme comprising of
shrubs, herbaceous plants, and grasses. A detailed strategy can be
sought via condition to ensure the landscaping scheme suitable
softens the edge of the development and provides for biodiversity
gain.  On this basis it is therefore considered that the development
complies with policies ENV2 of the LDP and 3 of NPF4. 
The incorporation of a landscaped edge and the new section of
footway will also ensure the development contributes positively to the
place as required by Policy 14 of NPF4. 
The delivery of car parking must be balanced against the
requirements of policies I1 of the LDP and 13 of NPF4 which seek to
facilitate and promote walking, cycling and public transport use. It is
noted that the car park includes EV charging to facilitate use by
electric vehicles. However, an emphasis must also be placed on
modal shift with respect to climate mitigation and adaptation. 
To facilitate walking and cycling the proposed development includes
provision for a missing link of footway along the north eastern
boundary of the site. This will complete a gap in the pedestrian
footway network between Inchinnan Drive and Greenock Road and
improve accessibility to the India of Inchinnan building. 
It is noted that the additional footway will require an amendment to the
boundary wall which fronts the building. The applicants propose to
realign the boundary wall to ensure that a 2m footway width can be
provided and has.  provided details of the section of the boundary wall
that would require realignment. 
The realignment of the wall will support the delivery of the footway in
accordance with policies I1 of the LDP and 13 of NPF4 and will
ensure the contribution the wall makes to the character of the place is
maintained in accordance with policy 14 of NPF4. The impact of the
works on the listed building will be assessed in detail via concurrent
listed building application 24/0025/LB. 
The proposed development also includes provision for cycle parking.
A final design of the cycle parking provision can be sought via
condition. 
The India of Inchinnan building is accessible via bus stops on
Greenock Road and Inchinnan Drive. The car park layout includes
provision for pedestrian permeability to provide a more direct link
Page 128 of 138

Page 135

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
between the building, the bus stops, and the surrounding pedestrian
network. 
Roads Development have requested submission of an update in
respect of the Active Travel Plan for the site to reflect recent and
proposed active travel infrastructure and how the gaps can be
overcome to reduce car dependency for the site in line with National
Policy. This can be controlled by condition. 
Taking the above into consideration, I am satisfied that the
development can make suitable provision for encouraging walking and
cycling and complies with the requirements of policies I1 of the LDP
and 13 of NPF4. 
In addition to this the development demonstrates climate adaptation
and mitigation via the provision of EV charging points and cycle
parking, and enhanced provision for pedestrian, cycle, and public
transport accessibility to the India of Inchinnan building. It is
acknowledged however that delivery of additional parking provision
could encourage trips to the site by car.  It is therefore considered
appropriate to impose a planning condition to ensure the site’s Active
Travel plan is updated. It is also noted that it has been indicated that
the proposals constitute the relocation of parking to the east of the
building in order to potentially allow the parking area to the west to be
redeveloped subject to planning and that parking need and demand
and active travel requirements could be assessed again at this time. It
is therefore considered that the net impact on parking provision would
therefore be balanced. On this basis I am satisfied the development
also complies with policies 1 and 2 of NPF4. 
In terms of drainage, a drainage strategy for the car park can be
sought via condition to ensure surface water is managed sustainably
in accordance with policies I3 of the LDP and 22 of NPF4.   
The development will support the role and function of Inchinnan
Business Park and is compatible with the surrounding character of the
area. It will not impact upon existing uses or potential economic
investment within the area. There will be no detrimental impact on
residential amenity, sensitive uses, the built or natural environment.
The development therefore complies with policies E1 of the LDP and
26 of NPF4. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Planning permission should therefore
be granted. 
RECOMMENDATION Grant subject to conditions  
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
Page 129 of 138

Page 136

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That prior to the commencement of development on site, the developer shall submit
for the written approval of the Planning Authority a strategy for the sustainable
drainage of surface water. Only the approved strategy shall thereafter be
implemented on site. 
Reason: To ensure surface water is managed appropriately in the interests of
sustainable drainage. 
2. That prior to the commencement of development on site, full details of all soft and
water landscaping works shall be submitted as part of a landscape strategy for the
written approval of the Planning Authority. The landscape strategy shall include (but
not be limited to) provisions in respect of: 
- all proposed trees, shrubs, hedgerows, areas of grass/wildflower seeding, turfing
including size, species, spacing and location.
- all areas of hard standing including location and materials.
- a plan showing proposed site levels. 
- all areas of surface water including ponds, and measures for the sustainable
management and drainage of surface water where applicable. 
- the implementation of all biodiversity and habitat enhancements.
- a timetable for the implementation of the landscape strategy.
- a strategy for the future management and maintenance of all landscaped areas
including provision for replacement of trees, shrubs, hedgerows and areas of
grass/wildflower seeding and turfing if they were to become diseased, die, become
seriously damaged or are removed within 5 years of being planted. 
The approved landscape strategy shall thereafter be implemented on site in
accordance with the approved timetable and shall be managed and maintained
thereafter for the life of the development. 
Reason: To ensure a robust landscaping strategy is implemented in the interests of
visual amenity, landscape character and biodiversity. 
3. That prior to the commencement of development on site, the developer shall
provide a specification for the written approval of the Planning Authority detailing
the location, design, materials and colour of any boundary fences, gates, walls, or
other method of enclosure to be installed at the site. Only the boundary fences,
gates, walls, or other methods of enclosure within the approved specification shall
thereafter be used in the development of the site. 
Reason: To ensure the methods of enclosure are of a suitable design in the
interests of visual amenity. 
4. That prior to the car park hereby approved being completed and made available for
use, the developer shall submit a travel plan for the written approval of the Planning
Authority. The travel plan shall set out measures to promote travel to the India of
Inchinnan building by sustainable modes (active modes and public transport), and
Page 130 of 138

Page 137

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
to reduce travel by single occupancy private vehicle. It shall include targets for
travel by sustainable modes, associated actions to achieve these targets, and a
scheme for regular monitoring and review whereby the measures will be continued,
or new measures will be identified to ensure targets are met. The measures within
the travel plan shall be implemented at the point when the car park is brought into
use and shall be reviewed thereafter in line with the approved travel plan. 
Reason: To encourage travel to the India of Inchinnan building by sustainable
modes, and reduce demand for single occupancy private vehicle trips. 
5. That all works associated with the realignment of the boundary wall shall be
undertaken in accordance with the methodology set out within the approved
‘Removal & Reconstruction of Boundary Wall – Method Statement’ prepared on
behalf of City Gate Construction and be completed prior to the car park hereby
approved being brought into operation. 
Reason: To ensure the works are undertaken in an appropriate manner that will
safeguard the character and special interest of the listed building. 
6. That prior to the car park hereby approved being completed and made available for
use, the developer shall submit a specification detailing the final location and
design of all bike stores as generally illustrated on approved drawing 682.AP.102 C
titled ‘Proposed Site Plan’ (and any subsequent approved revisions to this drawing).
The specification shall also include a timetable for the installation of the bike stores.
The approved stores shall thereafter be installed on site in accordance with the
approved timetable. 
Reason: To ensure suitable provision for bike storage at the development in the
interests of supporting sustainable transport. 
7. That the section of footway along the north eastern boundary of the site fronting the
Greenock Road/Inchinnan Drive roundabout as generally illustrated on approved
drawing 682.AP.102 C titled ‘Proposed Site Plan’ (and any subsequent
amendments to this drawing) shall be completed to an adoptable standard and
made available for use prior to the car park hereby approved coming into operation. 
Reason: To ensure pedestrian links are delivered in a timely manner in the interests
of pedestrian safety and accessibility. 
8. That all existing car parking located to the west of the India of Inchinnan building
as illustrated in approved drawing 682.AP.102 C titled ‘Proposed Site Plan’ (and
any subsequent amendments to this drawing) shall be retained and made available
for use by occupants of the India of Inchinnan building unless otherwise agreed in
writing with the Planning Authority. 
Reason: To retain control over overall parking provision at India of Inchinnan.  
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666
Page 131 of 138

Page 138

Page 132 of 138

Page 139

Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   24/0025/LB
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 12 –  Erskine
And Inchinnan 
Applicant: City Gate
Construction Ltd 
Registered: 15/01/2024 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Realignment of front
boundary wall 
LOCATION: India of Inchinnan Greenock Road, Inchinnan 
APPLICATION FOR: Listed Building Consent 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The India of Inchinnan building is a category A listed
building.
 Historic Environment Scotland have not commented
on the proposals.
 The proposal accords with the relevant provisions of
National Planning Framework 4, the Renfrewshire
Local Development Plan and Historic Environment
Scotland’s guidance.
 
 Alasdair Morrison
Head of Economy &
Development
Item 9(d)
PACC190324 Page 133 of 138

Page 140

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 24/0025/LB 
SITE ADDRESS  India of Inchinnan, Greenock Road, Inchinnan
PROPOSAL  Realignment of front boundary wall
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks listed building consent to realign a section of
boundary wall which fronts India of Inchinnan which is a category A
listed building. 
The boundary wall comprises of a base wall which is split into sections
by stone piers. There are metalwork sections between the piers, and
taller end piers at each end of the wall. The wall is finished in white
render to match the India of Inchinnan building. 
It is proposed to realign the three sections that are at the eastern end
of the wall. The realignment of the wall is required to accommodate a
new section of footway that is being delivered as part of planning
application 23/0296/PP for the formation of a car park at the eastern
end of the building.  Planning application 23/0296/PP is also being
presented to Board today. 
The applicant has submitted a methodology which sets out how the
realignment works will be undertaken. This includes retention of the
metal railings for reuse, and re-use of the original masonry as far as
possible to ensure the new wall seamlessly integrates with the
existing wall. 
SITE HISTORY Application No: 23/0296/PP
Description: Formation of car park with associated access and
landscaping and realignment of boundary wall
Decision: This application is also being presented to Board today for
determination. 
Application No: 18/0377/LB
Description: Re-rendering of external walls (in retrospect).
Decision: Granted 
Application No: 17/0823/LB
Description: Internal alterations including the formation of a partition
wall, formation of kitchen area and installation of additional toilet
cubicle
Decision: Granted 
Application No: 07/0751/PP
Description: Erection of 2 no. three storey office pavilions.
Status; Granted subject to conditions. 
Page 134 of 138

Page 141

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
Application No: 04/1056/LB
Description: Erection of 5 No. flagpoles on north elevation and 3 No.
flagpoles on east and west elevations.
Status; Granted subject to conditions. 
Application No: 04/0980/AD
Description: Erection of 5 no. flagpoles on north elevation and 3 no.
flagpoles on east and west elevations.
Status; Granted subject to conditions. 
CONSULTATIONS Historic Environment Scotland – No comments. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
National Planning Framework 4
Policy 7 - Historic assets and places
 
Renfrewshire Local Development Plan 
Policy ENV3 - Built and Cultural Heritage
 
New Development Supplementary Guidance
Delivering the Environment Strategy
 
Material Considerations
Historic Environment Scotland: Managing Change in the Historic
Environment Guidance 
PLANNING
ASSESSMENT
The Town and Country Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 states that in considering whether to grant
listed building consent special regard must be had to the desirability of
preserving the listed building and its setting as well as any features of
special architectural or historic merit. 
In terms of Development Plan policy, Policy 7 of NPF4 and Policy
ENV3 of the LDP are similar in that they both require works to listed
buildings to respect their character. The proposals must be assessed
against these policies, the relevant supplementary guidance, as well
as Historic Environment Scotland’s guidance notes. 
A key consideration in the assessment of the application is the
consultation response from Historic Environment Scotland (HES). In
this instance, HES have not commented specifically on the proposal
and have instead advised that it be assessed and determined in
accordance with the national and local policies and guidance set out
above. 
Page 135 of 138

Page 142

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
The requirement to realign the boundary wall has arisen from the
proposed formation of a missing section of footway which forms part
of the concurrent planning application 23/0296/PP. The alignment of
the existing boundary wall causes a pinch point at the eastern end of
the existing footway which prevents the ability to form an appropriate
standard of width of footpath for the missing section. The boundary
wall therefore requires to be realigned to ensure that a consistent
width of 2m can be maintained throughout the full length of the
footway. 
The boundary wall runs the full width of the Greenock Road site
boundary (approx. 25m) including to the front of the India of Inchinnan
building and the car park area to the west. It provides a distinctive and
well defined edge to the site, and complements the design and
appearance of the main building through the use of white render finish
and metal railings. 
The boundary wall is divided into sections via intermediate piers, with
each section incorporating metal railings. The realignment relates to
three sections at the eastern end of the wall which are in combination
approx. 17m in length (including the intermediate and end pier). The
wall will be realigned at a slight curve along the edge of the new
footway. 
The application includes a methodology and drawings which show
that the realigned wall will be constructed to match the character and
appearance of the existing wall. This includes reinstatement of the
metal railings and the render finish (including re-use of existing
masonry where possible). 
The realignment of this section of the wall is not considered to have a
detrimental impact on the character, appearance, or special interest of
the India of Inchinnan building. The realignment will also facilitate an
improved pedestrian network which will enhance circulation and
connectivity around the building. There have been no objections to the
work from Historic Environment Scotland. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Listed building consent should therefore
be granted.           
RECOMMENDATION Grant subject to conditions  
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
Page 136 of 138

Page 143

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
1. That all works associated with the realignment of the boundary wall shall be
undertaken in accordance with the methodology set out within the approved
‘Removal & Reconstruction of Boundary Wall – Method Statement’ prepared on
behalf of City Gate Construction and be completed prior to the car park (as defined
within planning application 23/0296/PP) being brought into operation. 
Reason: To ensure the works are undertaken in an appropriate manner that will
safeguard the character and special interest of the listed building. 
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666
 
 
Page 137 of 138