Planning Application: Report of Handling 
Reference No.   24/0025/LB
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 12 –  Erskine
And Inchinnan 
Applicant: City Gate
Construction Ltd 
Registered: 15/01/2024 
 
RECOMMENDATION 
Grant subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Realignment of front
boundary wall 
LOCATION: India of Inchinnan Greenock Road, Inchinnan 
APPLICATION FOR: Listed Building Consent 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The India of Inchinnan building is a category A listed
building.
 Historic Environment Scotland have not commented
on the proposals.
 The proposal accords with the relevant provisions of
National Planning Framework 4, the Renfrewshire
Local Development Plan and Historic Environment
Scotland’s guidance.
 
 Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 24/0025/LB 
SITE ADDRESS  India of Inchinnan, Greenock Road, Inchinnan
PROPOSAL  Realignment of front boundary wall
RECOMMENDATION Grant subject to conditions 
PROPOSALS This application seeks listed building consent to realign a section of
boundary wall which fronts India of Inchinnan which is a category A
listed building. 
The boundary wall comprises of a base wall which is split into sections
by stone piers. There are metalwork sections between the piers, and
taller end piers at each end of the wall. The wall is finished in white
render to match the India of Inchinnan building. 
It is proposed to realign the three sections that are at the eastern end
of the wall. The realignment of the wall is required to accommodate a
new section of footway that is being delivered as part of planning
application 23/0296/PP for the formation of a car park at the eastern
end of the building.  Planning application 23/0296/PP is also being
presented to Board today. 
The applicant has submitted a methodology which sets out how the
realignment works will be undertaken. This includes retention of the
metal railings for reuse, and re-use of the original masonry as far as
possible to ensure the new wall seamlessly integrates with the
existing wall. 
SITE HISTORY Application No: 23/0296/PP
Description: Formation of car park with associated access and
landscaping and realignment of boundary wall
Decision: This application is also being presented to Board today for
determination. 
Application No: 18/0377/LB
Description: Re-rendering of external walls (in retrospect).
Decision: Granted 
Application No: 17/0823/LB
Description: Internal alterations including the formation of a partition
wall, formation of kitchen area and installation of additional toilet
cubicle
Decision: Granted 
Application No: 07/0751/PP
Description: Erection of 2 no. three storey office pavilions.
Status; Granted subject to conditions.

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
Application No: 04/1056/LB
Description: Erection of 5 No. flagpoles on north elevation and 3 No.
flagpoles on east and west elevations.
Status; Granted subject to conditions. 
Application No: 04/0980/AD
Description: Erection of 5 no. flagpoles on north elevation and 3 no.
flagpoles on east and west elevations.
Status; Granted subject to conditions. 
CONSULTATIONS Historic Environment Scotland – No comments. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
National Planning Framework 4
Policy 7 - Historic assets and places
 
Renfrewshire Local Development Plan 
Policy ENV3 - Built and Cultural Heritage
 
New Development Supplementary Guidance
Delivering the Environment Strategy
 
Material Considerations
Historic Environment Scotland: Managing Change in the Historic
Environment Guidance 
PLANNING
ASSESSMENT
The Town and Country Planning (Listed Buildings and Conservation
Areas) (Scotland) Act 1997 states that in considering whether to grant
listed building consent special regard must be had to the desirability of
preserving the listed building and its setting as well as any features of
special architectural or historic merit. 
In terms of Development Plan policy, Policy 7 of NPF4 and Policy
ENV3 of the LDP are similar in that they both require works to listed
buildings to respect their character. The proposals must be assessed
against these policies, the relevant supplementary guidance, as well
as Historic Environment Scotland’s guidance notes. 
A key consideration in the assessment of the application is the
consultation response from Historic Environment Scotland (HES). In
this instance, HES have not commented specifically on the proposal
and have instead advised that it be assessed and determined in
accordance with the national and local policies and guidance set out
above.

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
The requirement to realign the boundary wall has arisen from the
proposed formation of a missing section of footway which forms part
of the concurrent planning application 23/0296/PP. The alignment of
the existing boundary wall causes a pinch point at the eastern end of
the existing footway which prevents the ability to form an appropriate
standard of width of footpath for the missing section. The boundary
wall therefore requires to be realigned to ensure that a consistent
width of 2m can be maintained throughout the full length of the
footway. 
The boundary wall runs the full width of the Greenock Road site
boundary (approx. 25m) including to the front of the India of Inchinnan
building and the car park area to the west. It provides a distinctive and
well defined edge to the site, and complements the design and
appearance of the main building through the use of white render finish
and metal railings. 
The boundary wall is divided into sections via intermediate piers, with
each section incorporating metal railings. The realignment relates to
three sections at the eastern end of the wall which are in combination
approx. 17m in length (including the intermediate and end pier). The
wall will be realigned at a slight curve along the edge of the new
footway. 
The application includes a methodology and drawings which show
that the realigned wall will be constructed to match the character and
appearance of the existing wall. This includes reinstatement of the
metal railings and the render finish (including re-use of existing
masonry where possible). 
The realignment of this section of the wall is not considered to have a
detrimental impact on the character, appearance, or special interest of
the India of Inchinnan building. The realignment will also facilitate an
improved pedestrian network which will enhance circulation and
connectivity around the building. There have been no objections to the
work from Historic Environment Scotland. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Listed building consent should therefore
be granted.           
RECOMMENDATION Grant subject to conditions  
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
1. That all works associated with the realignment of the boundary wall shall be
undertaken in accordance with the methodology set out within the approved
‘Removal & Reconstruction of Boundary Wall – Method Statement’ prepared on
behalf of City Gate Construction and be completed prior to the car park (as defined
within planning application 23/0296/PP) being brought into operation. 
Reason: To ensure the works are undertaken in an appropriate manner that will
safeguard the character and special interest of the listed building. 
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James Weir on 07483370666