Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0569/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley
Northwest 
Applicant: J29
(Scotland) Ltd c/o AS
Homes Scotland Ltd 
Registered: 01/09/2022 
 
RECOMMENDATION 
Refuse 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Approval of Matters Specified
in Conditions 2, 4 and 6 of planning permission in principle
approval 18/0638/PP, for the erection of a residential
development comprising 180 dwellinghouses 
LOCATION: Land at Junction 29, St James Interchange,
Ferguslie Park (Bound by Ferguslie Park Avenue, Existing
Railway Line, A737 And Blackstoun Road) 
APPLICATION FOR: Approval of Matters Specified in
Conditions 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 Planning permission in principle was previously granted
for a mixed-use development to include residential use
as well as hotels; a pub/restaurant; business, general
industry, storage & distribution; and long stay car
parking.
 This application seeks approval of matters specified in
conditions 2, 4 and 6 of the in principle consent as
regards the residential development of 180 dwellings.
 The site is identified as a Housing Land Supply Site in
the Renfrewshire Local Development Plan under which
Policy P2 applies.
 Children’s Services have objected on the grounds that
current school capacities are insufficient to accept
additional pupils from the new houses. 
 Chief Executive’s Service (Roads Development) have
objected to the site’s lack of connectivity.
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 22/0569/PP 
SITE ADDRESS  Land at Junction 29, St James Interchange, Ferguslie Park (Bound by
Ferguslie Park Avenue, Existing Railway Line, A737 And Blackstoun
Road)
PROPOSAL  Approval of Matters Specified in Conditions 2, 4 and 6 of planning
permission in principle approval 18/0638/PP, for the erection of a
residential development comprising 180 dwellinghouses
RECOMMENDATION Refuse 
PROPOSALS This application relates to an area of land situated to the south of the
A737 and Junction 29 of the M8 Motorway and north of Ferguslie Park
Avenue in Paisley. 
Planning permission in principle was previously granted in 2019 (ref
18/0638/PP) for a mixed-use development on the land to include
residential use as well as hotels, a pub/restaurant, business, general
industry, storage & distribution uses and long stay car parking. This
current application seeks the approval of matters specified in
conditions 2, 4 and 6 of the planning permission in principle consent
as regards the residential element of the wider mixed-use
development. 
Condition 2 of the planning permission in principle consent (ref:
18/0638/PP) required that prior to development commencing on any
area/phase of the site, a further application setting out detailed plans
and other relevant information must be submitted and approved by the
Planning Authority for the particular area or phase in question. As
such, this application seeks consent for the detail of the residential
element and in this respect is seeking approval of a residential layout
comprising 180 dwellinghouses. Condition 2 in this regard requires the
submission of: 
(a) the siting, design and external appearance (including details of
materials to be used) of all buildings and other structures
within the site; 
(b) the details of; and timetable for, the hard, soft and water
landscaping of the site; 
(c) the design and location of all boundary walls and fences,
including along the boundary with Network Rail's land; 
(d) the provision of drainage works; 
(e) the disposal of sewage; 
(f) the submission of a detailed survey showing the location and
nature of all trees and hedges within the site; 
(g) access and parking arrangements, including the provision of
any new roads and junctions;

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
(h) the layout of the site; 
(i) a Site Investigation report (characterising the nature and
extent of any soil, water and gas contamination within the site);
and, if remedial works are recommended therein;  
(j) a Remediation Strategy and Implementation Plan identifying
the proposed methods for implementing all remedial
recommendations contained with the site investigation report
prepared in accordance with current authoritative technical
guidance, has been provided by the Planning Authority; and  
(k) a report which satisfies the Planning Authority that the Local
Air Quality Management Objectives for the pollutants specified
in the relevant Air Quality Regulations, made under Part IV of
the Environment Act 1995, shall not be exceeded at any
location at or in the vicinity of the development where 'relevant
exposure' is liable to occur. In addition, the overall significance
of the air quality impacts from the development shall be
assessed and clearly defined within the report with mitigation
proposed where required. The survey and report shall adhere
to the methods and principles set out in the Scottish
Government publication 'Local Air Quality Management
Technical Guidance LAQM.TG(16)' and the EPUK guidance
document 'Land-Use Planning & Development Control:
Planning for Air Quality (January 20017)' or a method that has
been agreed with the Planning Authority. 
Additionally, Condition 4 of the planning permission in principle
consent states that the detailed submission required by Condition 2
must also contain a Drainage Impact Assessment (DIA), while
Condition 6 requires the submission and approval of a Noise Impact
Assessment (NIA) prior to any phase of the development being
brought into use. As such, the applicant has also submitted a DIA and
NIA in seeking approval of conditions 4 and 6 respectively. 
The proposed residential development, including its access, would
occupy an area of approximately 6.7 hectares towards the east of the
wider development site area. To the north-east the site is bound by an
existing railway line which connects Paisley with Inverclyde, while to
the west is an existing long stay car park. To the north, the residential
site is bound by part of the adjoining land to which the wider planning
permission in principle relates, with the area immediately to the north
having been identified for the pub/restaurant and hotel uses in an
indicative plan submitted with the previous application. 
The residential development would be bounded to the south by a
raised bund which marks the route of a dismantled railway line which
previously ran parallel to Ferguslie Park Avenue to the south. The
development would be accessed from Ferguslie Park Avenue via a
road which would be formed along the line of the former Middleton
Road which previously provided access to a smaller area of housing

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
to the north of the bund long since demolished. The road would run
roughly north-north-west from Ferguslie Park Avenue, passing
through a gap in the bund formed by the previous road. This would
lead to T-junction and the proposed residential development which
would be formed around a series of new interconnecting roads. 
The houses would comprise 25 three-storey townhouses and 155 two-
storey units contained within a variety of detached, semi-detached
and terraced house types. 102 of the units would accommodate three
bedrooms, with the remaining units comprising a mixture of 2-bed, 4-
bed and 5-bed properties. The finishing materials would include dry
dash render and concrete roof tiles, with 146 of the houses featuring
white render with grey roof tiles and the remaining 34 being of an
alternative colour scheme featuring cream/magnolia render and “rustic
red” roof tiles. 
The development layout also features a play area to the north end of
the site and an open space area towards the south, with a further area
of open space adjacent to the existing railway line to the north-east.
The development would also be served by a Sustainable Drainage
System which would entail the collection and routing of surface
drainage to a detention basin in the south-west of the application site. 
SITE HISTORY 92/1342/PP - Application for the erection of Class 11 warehousing,
surface car parking, a hotel, leisure facility (including 5-a-side-football
pitches and golf driving range) and a car showroom/workshop/petrol
filling station was subject of an appeal against the non-determination
by the former Renfrew District Council.  The appeal was subsequently
upheld and a conditional planning consent granted on 22 February
1994. 
97/0725/PP - Planning permission granted in outline for a mixed use
development comprising hotel, licensed restaurant, class 6 (six)
storage and distribution, 5-a-side soccer ground, golf driving range,
petrol filling station and allotments with new access and associated
infrastructure and landscaping on 17 December, 1999. A number of
related reserved matters applications have also been approved under
the umbrella of the original outline consent to purify conditions and
achieve consent for detailed matters such as siting, design, layout,
landscaping, access and materials for the various component parts of
the overall scheme. 
02/1304/PP - Mixed use development comprising hotel, licensed
restaurant, Class 6 warehousing, 5-a-side soccer ground, golf driving
range, petrol filling station and allotments with new access and
associated infrastructure and landscaping (reserved matters No. 1
application for outline planning permission re.  97/0725/PP). Granted
subject to conditions March 2003. 
02/1338/PP - Mixed use development (reserved matters no. 2
application for 140 bedroom hotel to include increased leisure
facilities).  Granted subject to conditions July 2003.

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
02/1339/PP - Mixed Use development (reserved matters no. 3
application for landscaping works and drainage/sewerage works).
Granted subject to conditions December 2003. 
02/1340/PP - Mixed use development (reserved matters no. 4
application for relocation of licensed restaurant as alternative to earlier
position shown in 02/1304/PP).  Granted subject to conditions May
2003. 
02/1341/PP - Mixed use development (reserved matters no. 6
application for relocation of petrol filling station). Granted subject to
conditions June 2003 
02/1342/PP - Mixed use development (reserved matters no. 5
application for 140 bedroom hotel).  Granted subject to conditions July
2003. 
02/1343/PP - Mixed use development (reserved matters no. 8
application for road infrastructure works) to open up Middleton
Road to through traffic. Granted in part June 2004. 
02/1344/PP - Mixed use development (reserved matters no. 7
application for floodlit 5-a-side football pitches (9 no.) together
with associated changing facilities). Granted subject to
conditions June 2003. 
04/0786/VR - Variation of condition 7 of outline planning permission
97/0725/PP to enable the commencement of construction works for:-
(a) site access road from A726 to first roundabout within the site, and
(b) erection of petrol filling station
prior to the completion of infrastructure works at St James Interchange
as detailed in the Dougall Baillie Associates drawing no. 8008/SK/04
dated June 1999.  Granted subject to conditions August 2004. 
06/0031/PP - Mixed use development comprising storage and
distribution, leisure/hotel, residential, hospital (ACAD facility) and
hotel/restaurant/public house and erection of advertising feature.
Granted subject to conditions May 2008. 
06/0033/VR - Partial deletion of condition 1. Granted subject to
conditions April 2005.   
06/0435/PP - Erection of residential development and formation of
access roads. Refused June 2010. 
18/0638/PP - Erection of mixed use development comprising
residential (Class 9), hotels (Class 7), pub/restaurant (Sui
Generis/Class 3), business (Class 4), general industrial (Class 5),
storage and distribution (Class 6) and long stay car parking with
associated access, infrastructure, landscaping and miscellaneous
works (in principle). Granted subject to conditions, March 2019.

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
 
CONSULTATIONS Chief Executive’s Service (Roads Development) – Object to the
site’s lack of connectivity. Comments also made regarding access and
parking. 
Chief Executive’s Service (Development Plans & Housing
Strategy) – No objections. 
Communities & Housing Services (Environmental Protection
Team) – No objections subject to conditions requiring mitigation in
relation to aircraft and railway noise and the submission of a
verification report to confirm all agreed mitigation measures in relation
to site contamination are undertaken. 
Children’s Services – Object to the development on the grounds that
existing schools serving the area currently lack capacity. The
capacities of St Andrew’s Academy and St Fergus Primary School are
both currently above 85%. 
Glasgow Airport Safeguarding – do not object to the proposed
development. Comments have been made in relation to impacts from
aircraft noise and landscaping. They advise that the proposed housing
would be sited within an area where the 57dB aircraft noise contour is
exceeded and that the landscaping proposed may increase the
potential for “bird strike" in respect of passing aircraft. 
Health and Safety Executive – No objection 
NATS – No objection. 
Network Rail – No objection subject to advisory guidance that prior to
development commencing details regarding certain aspects in relation
to construction are submitted to Network Rail’s Asset Protection
Engineer for approval. 
Scottish Water – No objection. 
Transport Scotland – No objection. 
Informative to be added: Not applicable 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations 
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
National Planning Framework 4
Policy 1 – Tackling the climate and nature crises
Policy 2 – Climate mitigation and adaptation
Policy 6 – Forestry, woodland, and trees
Policy 9 – Brownfield land, vacant and derelict land, and empty
buildings
Policy 13 – Sustainable transport
Policy 14 – Design, quality, and place
Policy 15 – Local living and 20 minute neighbourhoods
Policy 16 – Quality Homes
Policy 18 – Infrastructure first
Policy 22 – Flood risk and water management
Policy 24 – Health and Safety 
Renfrewshire Local Development Plan 
Policy E3 – Transition Areas (Development Opportunity Site)
Policy P1 – Renfrewshire’s Places
Policy P2 – Housing Land Supply Sites
Policy P3 – Housing Mix and Affordable Housing
Policy I1 – Connecting Places
Policy I3 – Flooding and Drainage
Policy I7 – Zero and Low Carbon Buildings
Policy I8 – Developer Contributions
Policy ENV2 – Natural Heritage
Policy ENV5 – Air Quality 
New Development Supplementary Guidance 
Delivering the Places Strategy
Delivering the Infrastructure Strategy
Delivering the Environment Strategy 
Material Considerations
Renfrewshire’s Places Residential Design Guide – March 2015
Scottish Government publications on Designing Streets and Designing
Places 
PLANNING
ASSESSMENT
Section 25 of the Town and Country Planning (Scotland) Act requires
decisions on planning applications to be made in accordance with the
Development Plan unless material considerations indicate otherwise.
The Development Plan comprises the National Planning Framework 4
(2023) and the adopted Renfrewshire Local Development Plan (2021). 
The fourth National Planning Framework (NPF4) provides the long-
term national spatial strategy for planning in Scotland. It sets out the
Scottish Government's current view on delivering sustainable, liveable
and productive places through the application of spatial principles. 
Policy 16 (Quality Homes) of NPF4 states that development
proposals for new homes on land allocated for housing in the Local
Development Plan shall be approved. In this respect, planning
permission in principle has previously been granted for residential

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
development at the site subject to a condition that the extent of
residential development would cover a maximum of 10 hectares site
area or 250 units, whichever is the lesser. The proposal in this case is
for 180 units over an area of approximately 6.7 hectares and therefore
accords with this condition. 
The application site is designated in the Adopted Renfrewshire LDP
as a Housing Land Supply Site under which Policy P2 of the LDP
applies. Additionally, the wider area containing the Housing Land
Supply Site is also designated as a Transition Area, under which
Policy E3 is applicable. Policy P2 and associated Appendix 1 identify
the site as having a capacity for 150 dwelling units, while Policy E3
outlines a range of additional uses appropriate in the wider Transition
Area including business, general industry, storage and distribution,
hotels, leisure uses, educational facilities and other commercial uses
of appropriate scale. 
While the proposal for 180 units exceeds the figure of 150 quoted in
Appendix 1, it is less than the maximum 250 allowed under the
planning permission in principle consent, and the site area of the
residential development is also less than the maximum allowable site
area of 10 hectares for the residential element. The proposal is
therefore compatible with the planning permission in principle consent
for Policies 16, P2 and E3 referenced above. Additionally, parts of the
site constitute previously developed land, having accommodated
previous housing. As such, redevelopment of these areas is also
generally supported by Policy 9 (Brownfield Sites) of NPF4. 
The applicant has also provided a supporting statement in relation to
affordable housing which has been assessed by the Chief Executive’s
Service (Development Plans & Housing Strategy section) as
delivering a sufficient range and choice of housing types in
accordance with Policy P3 of the Adopted LDP. In this regard, it is
commented that these range from smaller starter units through to
larger family homes and also address a recognised need to alter the
housing tenure and bring more families into the wider area. It is also
noted that the house price range would allow for low-cost housing
without subsidy which is compliant with Policy P3, while there is
considered to be sufficient social rented homes in the surrounding
area such that new build private, low cost home ownership would be
supported. The development is therefore considered to accord with
Policy 16 of NPF4 and Policy P3 of the LDP in delivering an
acceptable range and choice of housing to the area. 
Notwithstanding the above considerations, Children’s Services have
objected to the current application on the grounds that there is no
educational capacity to accommodate the additional pupils that would
be generated by the development. In this regard, it is advised that St
Andrew’s Academy and St Fergus Primary School which serve the
area are both operating above the acceptable threshold of 85%
capacity. The objection received from Children’s Services notes that
St Andrew’s Academy is operating at 118% capacity while St Fergus

Page 9

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
Primary School is operating at 97% capacity. Childrens Services have
estimated that the proposed development would generate 9 pupils to
the secondary school and 16 pupils to the primary school. To address
the impact on school pupil numbers the applicant has been invited, in
accordance with Policy 18 (Infrastructure First) of NPF4 and Policy
I8 of the LDP, to enter into a legal agreement under section 75 of the
Town and Country (Scotland) Act 1997 for the purpose of securing a
financial contribution towards education provision. In this respect,
Policy 18 of NPF4 states that development proposals will only be
supported where it can be demonstrated that provision is made to
address the impacts on infrastructure, while Policy I8 of the LDP
states that developer contributions will be sought to address
infrastructure deficits and/or shortfalls in infrastructure capacity that
arise as a direct result of new development. The applicant has
confirmed that they are not prepared to enter into any such
arrangement. 
The applicant advises that the matter of education provision and any
potential for developer contributions is a point of principle which
required to be, and was, considered at planning permission in
principle stage, and is not a matter of design detail which is covered in
the conditions to be addressed under any subsequent application for
approval of matters subject to condition. They also point out that the
report of handling for the planning permission in principle consent had
stated that there “is no issue with educational provision for the
residential element of this application”, having noted that capacity for
school pupils had been assessed at the time of the Adopted
Renfrewshire Local Development Plan 2014 under which the site had
been designated as a Housing Action Programme Site.  
A legal opinion has also been submitted on behalf of the applicant
which supports the applicant’s view that school capacity was
considered at the time of the planning permission in principle
application and that it was not a matter reserved by condition. As the
planning permission in principle allows for up to 250 homes, the
submission advises that the Council should therefore have factored
this into their school roll forecasts and it should already be included
within the existing school capacities.
While the applicant’s position is acknowledged, the objection raised by
Children’s Services is a material consideration. In addition, it is also of
significance to note that legal advice offered to the Planning Authority
in respect of similar cases to that subject to this report notes that it is
reasonable for the provision of education to be considered in respect
of an application for the approval of matters specified in conditions.  In
this context, it is not considered reasonable to grant a residential
development of this size given current educational capacity issues
and the objection of Children’s Services without this matter being
addressed by the applicant. 
In terms of the other aspects of this application, the individual matters
outlined in Condition 2 are considered in turn below:

Page 10

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10
 
(a) the siting, design and external appearance (including details of
materials to be used) of all buildings and other structures
within the site
Policy 14 (Design, Quality and Place) of NPF4, Policy P1 of
the LDP and the Renfrewshire New Development
Supplementary Guidance and Residential Design Guide seek
to promote well designed developments that makes successful
places. The dwellinghouses in this case would be of an
appropriate mixture of house types and designs which would
be suitably spaced, oriented and designed to offer streets
which would be suitably visually attractive. The properties
would in this regard feature a mixture of finishing materials,
with two different colour schemes proposed which would
complement each other and add visual interest to the
development. The general layout and the design and finishings
of the properties, together with the proposed landscaping and
greenspaces, would lend the development an identity and
visual quality.
Since the original planning permission in principle consent,
today’s adopted LDP has introduced a requirement under
Policy I7 that new housing, in meeting building standard
energy requirements, must install technology that produces
low or no amounts of carbon dioxide emissions, to reduce
predicted emissions by at least 15% below 2007 building
standards. This also supports one of the key objectives of
NPF4 and particularly Policy 1 (Tackling the Climate and
Nature Crises) and Policy 2 (Climate Mitigation and
Adaptation). In the event that planning permission should be
granted, it is considered that the final specifications of these
technologies could be subject to condition. 
(b) the details of; and timetable for, the hard, soft and water
landscaping of the site
Landscaping plans have been submitted which indicate the
planting of some 153 trees including native species such as
alder and silver birch and a range of cultivated species
including fastigiate birch and fastigiate hornbeam, with a range
of shrubs, hedgerows and areas of green space also lending
appropriate setting and visual amenity to the wider
development. A suitable variety of hard surface is also
proposed, with tarmac and different colours of block paving
providing for a hierarchy of roads within the development, plus
whin dust footpaths within the areas of green space. A SuDS
detention basin is also proposed at the south-west of the site
for the treatment of surface water from the development.

Page 11

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11
 
Glasgow Airport Safeguarding raised a holding objection in
order to clarify aspects of the proposed detention basin and
also the high proportion of hawthorn in the scheme of
landscaping due to concerns that these could attract flocking
birds which could in turn affect the passage of aircraft. While
these aspects have not been addressed, it is considered that
in the event of the application being approved, they could be
mitigated by an appropriate planning condition.
(c) the design and location of all boundary walls and fences,
including along the boundary with Network Rail's land
The proposed boundary treatments throughout the
development are considered appropriate. These include a
mixture of 1.8m high timber fencing and lower 0.75m high post
and rail fencing along the side and rear boundaries of the
plots, while the applicant has also agreed to add a more
durable boundary treatment around some of the more
prominent plots, with fencing panels separated by stone piers
featuring facing bricks. These specifications are considered
acceptable. Network Rail have also confirmed their
acceptance of the proposals.
(d) the provision of drainage works
These details have been submitted in conjunction with a
Drainage Impact Assessment required by Condition 4. It is
considered that the level of detail is sufficient in demonstrating
that the drainage from the development would be appropriately
addressed. This matter is also considered in further detail
below under Condition 4.
(e) the disposal of sewage
These details have also been submitted in conjunction with the
Drainage Impact Assessment required by Condition 4 and are
considered acceptable. The information demonstrates that foul
drainage would be collected from each individual property via
piping which would then connect to the existing combined
sewer to the south of the site. Scottish Water have confirmed
no objection to the development.
(f) the submission of a detailed survey showing the location and
nature of all trees and hedges within the site
An arboricultural assessment by professional arborists has
been submitted which finds that much of the derelict site to the
east has become naturalised by woodland containing trees of
a diameter of up to 35cm. Trees mostly comprise goat willow,
with silver birch and hawthorn also present. Further west is
more scrubby, younger woodland with goat willow dominant,
while three standalone trees have also been surveyed and

Page 12

Renfrewshire Council Planning and Climate Change Policy Board 
Page 12
 
classified as of low quality. No TPOs or other statutory
designations are in place. 
While some notable areas of treecover would be cleared to
accommodate the development, no individual trees or
woodland of outstanding quality have been identified, while
new planting has been identified within the scheme of
landscaping. Given the limited quality of the treecover on site
and the landscaping proposed, the development is considered
to comply acceptably with Policy 6 (Forestry, Woodland and
Trees) of NPF4 and Policy ENV2 of the LDP.
(g) access and parking arrangements, including the provision of
any new roads and junctions
The Chief Executive’s Service (Roads Development) has
objected to the proposal’s lack of connectivity and in particular
to West March Road which is shown on the indicative
masterplan approved with the planning permission in principle
application. The applicant has advised that this access has
been omitted as no condition on the planning permission in
principle application was imposed to provide this connection.
The applicant was encouraged to consider a further access
into the site at the north end to allow greater permeability
through the development and to remove reliance on the
development’s only access from Ferguslie Park Avenue to the
south. It is considered that such a measure would enable the
development to integrate better with the surrounding area and
accord in this respect with the Scottish Government’s
Designing Streets Policy which encourages developments
with multiple accesses rather than cul-de-sacs. The principle of
this approach is also considered to accord with Policy 14
(Design, Quality and Place) of NPF4 and Policy P1 and Policy
I1 of the LDP. 
While discussions with the applicant indicated an initial
willingness from them to accommodate such an access, they
have not submitted any follow-up proposal or pursued any
further discussions on this matter. It is considered that this
issue could be addressed relatively easily with an additional
access point into the development added from the north. In
view of the objection from Roads Development and lack of any
alternative scheme submitted to enable connectivity from the
north, it is not considered that the current access arrangement
can be supported. 
Within the development itself, suitable pedestrian routes are
proposed, including footways, shared surfaces and additional
footpaths across areas of open space including the central
amenity area. These provisions are considered to generally

Page 13

Renfrewshire Council Planning and Climate Change Policy Board 
Page 13
 
accord with Policy 13 (Sustainable Transport) of NPF4 and
Policy I1 of the LDP. The applicant has also been encouraged
to form additional pedestrian/cycle connections to link the
development to the south but advise that they are unable to
entertain such connections due to a lack of control over the
land to the south and the extent of disturbance that would be
required to the former railway embankment. However,
footways would be provided alongside the one access road
into the site which would in turn connect with the existing
footway on Ferguslie Park Avenue which is also a designated
core path.
(h) the layout of the site
As noted above, the applicant has elected not to add any
additional vehicular access into the development. The layout
would otherwise be characterised by a series of
interconnecting streets with areas of green space, including a
play area at the north of the site. Plot sizes and gardens would
vary in size and would in some cases be relatively small but
would still allow for an acceptable depth of at least 9 metres as
well as private open space to plot ratios which would generally
be commensurate with the recommendations outlined in the
Renfrewshire Council Residential Design Guidance. Properties
would also be appropriately positioned in relation to each to
result in minimal overlooking or overshadowing. 
The development would be physically isolated from other
residential areas, with the bund along its southern edge and a
strip of further open space separating it from Ferguslie Park
Avenue to the south. However, the adjoining area to the south
of the bund is noted to be Council-owned and therefore offers
opportunity for future integration with the wider Ferguslie Park
area which is currently subject to various ongoing regeneration
activity. A local place plan has also been established by the
local community which identifies the application site area as
derelict/vacant land appropriate for development, with the
bund also identified as having the potential to contribute to a
multifunctional “green high line” serving the wider area. As
such, it is considered that the development could potentially
benefit from future plans to improve integration within the wider
area and local services and contribute to local living and the
‘Place Principle’ promoted by Policy 15 of NPF4. 
(i) a Site Investigation report (characterising the nature and
extent of any soil, water and gas contamination within the site);
and, if remedial works are recommended therein
A Site Investigation report by consultants on behalf of the
applicant has been submitted and reviewed as acceptable by

Page 14

Renfrewshire Council Planning and Climate Change Policy Board 
Page 14
 
contaminated land specialists within the Council’s
Communities & Housing Services (Environmental Protection
Team) following clarification on certain technical aspects. The
report identifies a number of sources of contamination which
will require remediation works prior to development
commencing.
(j) a Remediation Strategy and Implementation Plan identifying
the proposed methods for implementing all remedial
recommendations contained with the site investigation report
prepared in accordance with current authoritative technical
guidance, has been provided by the Planning Authority;
A Remediation Strategy and Implementation Plan by the same
consultants has also been submitted. This sets out proposed
measures for addressing the issues of contamination identified
in the Site Investigation report. As with the Site Investigation
report, the Remediation Strategy and Implementation Plan has
been reviewed by Communities & Housing Services
(Environmental Protection Team) and confirmed by them as
acceptable following clarification on certain technical aspects.
The document includes measures for addressing Polycyclic
Aromatic Hydrocarbons (PAHs) and Asbestos Containing
Materials (ACMs) identified through the Site Investigation.
The applicant has therefore demonstrated that site
contamination can be appropriately addressed, in accordance
with Policy 9 of NPF4 and the New Development
Supplementary Guidance.
(k) a report which satisfies the Planning Authority that the Local
Air Quality Management Objectives for the pollutants specified
in the relevant Air Quality Regulations, made under Part IV of
the Environment Act 1995, shall not be exceeded at any
location at or in the vicinity of the development where 'relevant
exposure' is liable to occur. In addition, the overall significance
of the air quality impacts from the development shall be
assessed and clearly defined within the report with mitigation
proposed where required. The survey and report shall adhere
to the methods and principles set out in the Scottish
Government publication 'Local Air Quality Management
Technical Guidance LAQM.TG(16)' and the EPUK guidance
document 'Land-Use Planning & Development Control:
Planning for Air Quality (January 20017)' or a method that has
been agreed with the Planning Authority.
The applicant has submitted an Air Quality Assessment by
consultants, the findings of which have been confirmed as
acceptable by the Communities & Housing Services
(Environmental Protection Team). The assessment outlines

Page 15

Renfrewshire Council Planning and Climate Change Policy Board 
Page 15
 
the results of a model to investigate both whether there is
potential for traffic from the development to impact on the air
quality of existing residents in the nearby area and whether the
air quality in the vicinity is suitable for new residents
associated with the proposed development.  On both fronts,
the model finds there to be no significant issues and concludes
that the development does not raise any material concerns
with regard to air quality. As such, the development is found to
accord with Policy 24 (Health and Safety) of NPF4 as
regards air quality and Policy ENV 5 of the LDP.
Turning to Condition 4, this required the submission and approval of a
Drainage Impact Assessment (DIA). The submitted DIA outlines that
foul drainage would be routed to the existing combined sewer to the
south of the site, while surface water would be collected and routed to
a detention basis to the south-west of the site where it would be
treated and directed further west to the Candren Burn.
The DIA has been peer reviewed and subject to amendments to
clarify certain aspects of its findings the updated DIA is found to be
acceptable. It is therefore considered that drainage from the
development can be successfully accommodated in accordance with
Policy 22 of NPF4 and Policy I3 of the LDP.
Condition 6 refers to the submission and approval of a Noise Impact
Assessment (NIA). In this respect, the applicant has submitted a
report outlining the findings of a noise and vibration survey which
considers the impact of existing external noise on the proposed
houses from road and railway traffic in the area, as well as from noise
associated with aircraft from the nearby airport. Measurements are
also included with respect to vibration from the adjacent railway to the
north-east. The report also considers the likely impact on the housing
of the other non-residential elements allowed under the planning
permission in principle approval for the wider site including the hotel,
restaurant/public house, industrial, storage & distribution and long stay
car park uses.
Communities & Housing Services (Environmental Protection Team)
have considered the findings of the report and confirmed no objection
subject to conditions to ensure particular glazing standards to mitigate
noise impact within the properties. However, they have advised that it
is not possible to recommend any conditions or mitigation to address
the impact of aircraft noise on external areas such as gardens. 
Glasgow Airport have noted with reference to their most up to date
‘Actual’ noise contours based on 2017 data that the residential
development is located within an area where aircraft noise levels are
in excess of 57dB LAeq. While they do not formally object to the
development, they point out that the New Development
Supplementary Guidance on Noise states that “residential

Page 16

Renfrewshire Council Planning and Climate Change Policy Board 
Page 16
 
development should avoid areas where aircraft noise levels are in
excess of 57dB LAeq” and that “applications for residential
development will be refused unless a noise assessment and noise-
insulation measures can demonstrate that an appropriate level of
residential amenity could be achieved”. 
At the time that planning permission in principle was granted, the
previous 2011 noise contours provided the most up to date official
noise data. Under the 2011 noise contours, the development was
entirely outwith the 57dB noise contour and was therefore compliant
with the guidance. In the period since planning permission in principle
was granted, the 2017 noise contours have been adopted as the most
up to date “actual” noise data and the development is no longer
situated outwith the 57dB threshold given the shift in the noise
contours. However, as neither Glasgow Airport nor the Communities &
Housing Services (Environmental Protection Team) have objected to
the development on noise grounds, and the latter have accepted the
mitigation measures proposed, the submitted Noise Impact
Assessment is considered to sufficiently satisfy the requirement of
Condition 6 of the planning permission in principle consent. 
In summary, whilst it is considered that the development can
contribute to the wider area in addressing varied housing needs in the
Ferguslie Park area, given the lack of school capacity and objection
from Children’s Services and that the applicant has elected not to
address this matter, it is not considered reasonable to support the
development at this current time. Furthermore, as the Chief
Executive’s Service (Roads Development) has objected and the
applicant has elected not to include any alternative access into the
site from the north, the site layout in relying on a single access from
the south is not considered to comply with prevailing policy in terms of
connectivity and integration of the development into the surrounding
area. It is therefore recommended that consent is refused.
RECOMMENDATION Refuse
 
Reason for Decision
1. That the proposed development will result in an unacceptable impact on educational
infrastructure due to the current capacity of St Andrew’s Academy and St Fergus
Primary School both exceeding 85% capacity. The proposed development is therefore
considered to be contrary to Policy 18 of the Fourth National Planning Framework and
Policy I8 of the Renfrewshire Local Development Plan as no mitigation has been
provided for this impact.
2. That the development does not provide suitable integration and connectivity with the
surrounding area given its reliance on a single access point from Ferguslie Park Avenue
to the south and is therefore considered contrary to Policy 14 of the Fourth National

Page 17

Renfrewshire Council Planning and Climate Change Policy Board 
Page 17
 
Planning Framework and Policy P1 and Policy I1 of the Renfrewshire Local
Development Plan. 
Local Government (Access to Information) Act 1985 - Background Papers