Democracy Spraffa

1. Site Development Brief – Paisley Grammar School - Report

Renfrewshire Council · 19 March 2024
Back to Planning and Climate Change Policy Board — 19 March 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________ 
To: Planning and Climate Change Policy Board 
On: 19 March 2024
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Site Development Brief – Paisley Grammar School 
___________________________________________________________________ 
1. Summary 
1.1 A site development brief has been prepared for Paisley Grammar School,
Glasgow Road, Paisley. 
1.2 The Education and Children’s Services Policy Board of 21 January 2021
approved the relocation of Paisley Grammar School to a new campus at
Renfrew Road, Paisley (23/0283/PP).  The new School is anticipated to begin
construction later this year and open in 2026.   
1.3 Board approval to declare the current Paisley Grammar School building surplus
will be sought from the Infrastructure, Land and Environment Board at a future
meeting.  The development brief for the site will be progressed subject to this
approval. 
1.4 The development brief identifies a number of factors which will require to be
considered in preparing development proposals for the site.  The brief will be a
material consideration in the assessment of future planning applications. 
1.5 If approved, a copy of the development brief will be put on the Council webpage
at www.renfrewshire.gov.uk/article/12717/Development-briefs 
___________________________________________________________________

Page 2

2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the site development brief relating to the current Paisley
Grammar School, Glasgow Road, Paisley. 
___________________________________________________________________ 
3. Background 
3.1. The development brief sets out a planning framework for the potential
development site and highlights a number of considerations which require to be
taken into account in preparing a development proposal.  These include:- 
 Site context
 Site layout and building design
 Access and parking
 Landscaping and boundary treatments
 Sustainable urban drainage
 Renewables/sustainability 
4. Next Steps 
4.1. If approved by the Board and following approval of the Infrastructure, Land and
Environment Board to declare the property surplus, the development brief will
be placed on the Council’s web pages and used to guide development
proposals for the site. 
______________________________________________________________ 
Implications of the Report 
1. Financial – None.. 
2. HR & Organisational Development – None. 
3. Community Planning – 
Reshaping our place, our economy, and our future – the proposed
development brief sets out a framework for supporting, encouraging, and
delivering sustainability, climate change adaption, reaching Net Zero, biodiversity
gain and creating great places. 
4. Legal – None. 
5. Property/Assets – Site to be marketed for sale if declared surplus by Council in
due course. 
6. Information Technology – None.

Page 3

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Change – The proposed development brief seeks to ensure that any
development progressed will be undertaken in a sustainable manner and supports
adaption measures required as a result of climate change. 
___________________________________________________________________ 
Appendices 
(a)  Paisley Grammar School, Glasgow Road, Paisley – Development Brief 
List of Background Papers 
(a)  Education and Children’s Services Policy Board, 21 January 2021 -  Response
to proposal to consult on the relocation of Paisley Grammar School to a new
build Community Campus at Renfrew Road, Paisley
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk Tel: 07483 136235

Page 4

Paisley Grammar, Glasgow Road, Paisley  
Development Brief 2024 DRAFT

Page 5

Paisley Grammar, Glasgow Road, Paisley 
Development Brief 2024
Introduction
The purpose of this development brief is to set out the planning context
and provide design advice in relation to the development opportunity at
Paisley Grammar, Glasgow Road, Paisley.
Background Information
In May 2019 the Education and Children’s Services Policy Board
approved the report Developing the School Estate Management
Plan which included a proposal to undertake a statutory consultation
on building a new Paisley Grammar School.  A condition survey had
categorised Paisley Grammar school as condition level C which meant
that the building was showing signs of major defect and that it was not
operating as intended. A short list of three options were considered
which included:
Following the formal consultation process which gained support from the
school, wider community and Education Scotland the recommendation
was to build a community campus on the former Chivas Regal site at
Renfrew Road, Paisley.  This campus will be ambitious and forward
thinking and will incorporate a flexible learning resource for young
people  with additional support needs and a variety of facilities to support
community learning and enterprise activity for the wider community.
It is anticipated that the new school will become operational in 2026 and
the existing Paisley Grammar site will be declared surplus to requirements.
New build Paisley Grammar Community Campus at  
existing location;
New build Paisley Grammar Community Campus at  
Renfrew Road in Paisley; and
New build Paisley Grammar Community Campus at  
Seedhill Road in Paisley.
DRAFT

Page 6

Paisley Grammar History
The foundation stone of Paisley Grammar / William Barbour Academy
was laid in 1896. The School was officially opened in 1898 and consisted
of a central building with two towers one on each side.
Over time the building has been altered to reflect the needs at the time.
In the 1920s provision was made for a primary department which was
known as the Crossflat Crescent Annexe.  In the 1940s two blocks of
temporary huts were constructed where the east and west wings currently
stand.  These temporary buildings lasted until major construction was
undertaken in the late 50s/ early 60s when the west and east wings
were constructed along with a gymnasium and assembly hall.
In the early 2000s there was the reorganisation of school provision
in Paisley and major work was undertaken to improve and extend the
facilities of Paisley Grammar. Two new three storey classroom blocks
were erected to the rear of the existing building to provide additional
classroom space and new library, games hall and changing facilities. 
This work was completed in 2002.
Source: http://www.paisleygrammarschool.com/school-history.html  
C
A B
D
B
C
D
A
NN
Paisley Grammar School
Glasgow Road (A761) 
DRAFT

Page 7

Local Context Map Key
Site
400m / 800m Radius
A Road
Local Road
Train Station
Train Line
Conservation Area
Housing Regeneration 
Programme
Policy P 1 -
Renfrewshire’s Places
Policy P 6 -
Open Space
Policy C 1 -
Renfrewshire’s Network of Centres
DRAFT

Page 8

Site Context
Paisley Grammar is located to the east of Paisley Town Centre along
Glasgow Road (A761). Glasgow Road is a key transport link between
Paisley and Glasgow. The site is bounded on all sides by either Glasgow 
Road, McKerrell Street or Crossflat Crescent. 
The original building designed by T G Abercrombie in Scots Renaissance
style, 1960s wings, janitors lodge, boundary walls and gatepiers are
Category B Listed (http://portal.historicenvironment.scot/designation/
LB39129)
Site Context
The site is approximately 1.6ha in size.  The principal elevation faces
towards Glasgow Road and lies just outside the Greenlaw Conservation
Area. The original Paisley Grammar and 1960s extension is set back
approximately 40m from the street. There is currently staff parking and
playground space to the front of the building as well a tree belt and
grass area along Glasgow Road that provides the landscape setting for
the Listed Building. The main entrance to the site is through the Listed
Gatepiers.  There is also vehicular access to the site from McKerrell
Street.
Towards the north east corner of the site is the Janitors House that
was designed by the local architect James Steel Maitland in an art
deco style. It should be noted that the Janitors House is outwith the
development site.
The area is urban in nature. There is mixed land use in the surrounding
area.  To east, south and west of the site is primarily residential use,
in particular traditional tenement properties. Glasgow Road offers
a wide range of local shops and services.  Within a 10 to 15 minute
walk there are local primary schools, Barshaw and East End Park,
supermarkets and Paisley Town Centre which offers a wide range of
shops and services.
The site has good access to public transport. There are bus stops
adjacent to the site with frequent bus services to Paisley and Glasgow.
Both Paisley Gilmour Street Station and Hawkhead Station are both
within a 10 to 15 walk.
DRAFT

Page 9

Regeneration and Renewal Programme
The council is currently undertaking a  housing
regeneration and renewal programme across
Renfrewshire aimed at delivering modern,
high quality, energy-efficient and affordable
council housing which will contribute to the
transformation of Renfrewshire as a place.
To the south of Paisley Grammar is the Howard
Street/ Auchentorlie renewal program where
there is a vision to enhance the Howard Street
and Auchentorlie/Seedhill areas as part of
a wider 20 minute neighbourhood. The aim
is create places where people can live well
locally with well connected with greenspaces,
facilities and activities which support a
healthy and sustainable place.
A mix of demolition and housing investment
is proposed and this will provide the
opportunity to reimagine spaces within the
area, including the enhancement or creation
of new community space which act a focus
for residents and align with the aspiration for
the neighbourhood as a liveable, sustainable
and productive place.
Proposed demolition
Proposed housing investment 
Howard Street Area
DRAFT

Page 10

Site Layout and Building Design
This section of the development brief sets out the main planning parameters
that should be taken into account in preparing development proposals for the
site. It does not intend to be prescriptive in terms of imposing a specific layout
or building design but rather to establish basic principles.
Any development proposal must be comprehensive, imaginative, and use place-
based design principles. Key Listed Buildings must be retained and incorporated
in a sympathetic manner. Early engagement with Council Officers and Historic
Environment Scotland is encouraged to consider further detail in this regard. 
Any new ancillary development such as parking or bins should also be located
appropriately, to protect the setting of the Listed Building.
Land Use
The site is considered suitable for a range of uses compatible with those
neighbouring, in accordance with the Local Development Plan. It is
considered that the site may offer particular opportunity for residential
use. As Paisley Grammar is Category B Listed it is considered to be a key
heritage asset which is a priority for adaptation and restoration.
Built Form
The Council supports the implementation of guidance from the Scottish
Government in respect of innovative approaches to place making, in
particular Designing Places and Designing Streets. Renfrewshire’s Places
Design Guide sets out further guidance in relation to sustainable place
making and design which requires to be reflected in any development
proposal: http://www.renfrewshire.gov.uk/article/3041/Development-
Planning-Guidance. Development proposals for the site should reflect
the approach and principles established in these documents. Any new
development must be sympathetic to the listed buildings on site and the
wider context in relation to height. DRAFT

Page 11

Landscaping and Boundary Treatments
Development must protect existing trees, protecting important habitats
and biodiversity as well as maintaining the existing natural screening. The
trees also provide an important landscape setting for the Listed Buildings.
In order to protect existing trees, any development should include
landscape buffers around trees, which will be informed by a tree survey
provided by the applicant. The landscape buffers will ensure any new
development is sited well clear of root protection areas and the crown
spread of trees.
The provision of planting and preservation of trees must be in line with
the Renfrewshire’s Planning & Development Tree Policy.
There is a presumption against any tree removal on site and any
proposed development should be designed to take account of existing
trees on site. Should the development proposal identify the removal
of any trees, a detailed justification together with a comprehensive
landscaping scheme and appropriate compensatory planting will be
required.
Boundary treatment using high quality materials and planting will be
required to define public and private spaces contributing to the areas
character.
DRAFT

Page 12

Accessibility
Innovative design solutions in respect of access and parking which
reflect the principles of Scottish Government guidance are welcome.
As a general requirement, all roads, footpaths, servicing and parking
requirements should be designed in accordance with the guidance set out
in the National Roads Development Guide (SCOTS, 2017) and Design
Manual for Roads and Bridges.
Parking and service provision will be subject to development type.
Early engagement with the Council as the Roads Authority is encouraged
to consider further detail in this regard.
Sustainable Urban Drainage Systems
Drainage requirements, constraints and solutions will be integral to the
layout and submission of the planning application.
New development will require to integrate surface water management
into the design of green infrastructure including naturalised Sustainable
Urban Drainage Systems and permeable surfaces.
Renewables/Sustainability
Low or Zero carbon generating technologies require to be integrated
into the development proposal including the use of both active carbon
reducing technologies such as solar panels or ground source heat
pumps and passive factors such as orientation, siting, ventilation and
sustainable materials. Provision requires to be made for electric car
charging points for residents.
These details will require to be outlined in a Sustainability Statement and
submitted along with the planning application.
P V
P
PP
P
V
P
Pedestrian & Vehicular Access
Bus Stop Locations
Site Boundary 
B Listed Buildings
C Listed Buildings C
B
DRAFT

Page 13

Digital Connections
The development will incorporate existing or future high speed digital network
connections and other digital technologies that could improve connectivity. These
details require to be included in the submission of the planning application.
Affordable Housing
If a residential development is proposed and the site capacity exceeds 50 units,
affordable housing requirements will require to be addressed providing 25%
of the total site capacity as affordable homes.  Affordable housing requires
to be tenure blind with a similar design and style to the open market housing.
Early discussions with the Council are encouraged to discuss the requirements
for the delivery of affordable homes on site and potential Registered Social
Landlord partners.
Education Provision
If a residential development is proposed the cumulative impact of residential
development on both primary and secondary school provision will require
consideration subject to the final site capacity, potential site start and
phasing of the development. Once further details are known in relation to
the proposed development, it should be noted that a developer contribution
in respect of education provision may be required.
Open Space Provision
Children’s play areas are sought for all housing developments more than
50 units. Provision should be the equivalent to 1 square metre per house
in the form of a single area serving 50-150 units. Early engagement with
Development Management is encouraged to consider further detail in
this regard.
Developer`s Responsibilities
The developer will be solely responsible for the following:
• Establishing to their satisfaction the whereabouts of, and   
constraints concerned with all services in, on, over, under
and adjacent to the site.
• Ensuring compliance with all statutory undertakers’   
requirements.
• Establishing to their satisfaction the soil and mineral conditions 
of the site.
• Ensuring compliance with requirements of planning and   
building standards consent.
Supporting Information
A planning application should be accompanied by the following
information:
• Sustainability Statement
• Ecology Report/ Habitat Survey
• Drainage/Flood Assessment
• Transport Assessment/Statement
• Site Investigation (soil condition)
• Design and Access Statement
• Landscape / Built Heritage Visual Assessment & Plans
• Tree Survey and associated management, maintenance and 
compensatory planting plans
• Plan(s) detailing safe routes to schools/local services
• Planning StatementDRAFT

Page 14

Further Enquiries
Further enquiries in relation to the content of this
planning statement should be directed to: 
dc@renfrewshire.gov.uk
Paisley Grammar, Glasgow Road, Paisley  
Development Brief 2024
DRAFT