Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   23/0505/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 4 – Paisley
Northwest 
Applicant: The
University of the West of
Scotland 
Registered: 
22/09/2023 
 
RECOMMENDATION
Grant, subject to
conditions 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Installation of replacement
windows and doors, solar panels, two ramps, railings,
cladding and a false floor. Erection of extension; formation of
window and door openings; renewal of roof; stonework
repairs; and landscaping works 
LOCATION: University of the West of Scotland, Storie
Street, Paisley, PA1 2BX 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The building is B listed and is located within both
Paisley Town Centre and its Conservation Area. 
 No representations were received. 
 The proposal accords with the relevant provisions of
both National Planning Framework 4 and the
Renfrewshire Local Development Plan. 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 23/0505/PP 
SITE ADDRESS  University of the West of Scotland, Storie Street, Paisley, PA1 2BX 
PROPOSAL  Installation of replacement windows and doors, solar panels, two
ramps, railings, cladding and a false floor. Erection of extension;
formation of window and door openings; renewal of roof; stonework
repairs; and landscaping works 
RECOMMENDATION Grant, subject to conditions 
PROPOSALS This application seeks planning permission for the extension of, and
alterations to, a detached building on Storie Street, Paisley. 
The vacant building, which is located within the University of the West
of Scotland campus, fronts a road to the east and is bound by a
mixture of commercial and residential properties. The building is B
listed and sits within both Paisley Town Centre and its Conservation
Area. 
The two storey sandstone property has a dual pitched slate roof and
timber framed windows. A single storey red brick rotunda projects
from the rear. 
Several structures that sit between the main two storey building and
the rotunda would be removed and a small, flat roofed extension
would be constructed. Aluminium cladding would be installed along
part of the northern elevation of the rotunda. 
Replacement windows and doors would be installed across the
property while two new window openings (with decorative aluminium
shutters) would be formed on the southern elevation of the main
building. 
The ramp that provides access to the rotunda roof from the first floor
of the main building would be removed and a new ramp, false floor
and railings would be installed on the rotunda roof to create useable
outdoor space. In association with the installation of the new ramp,
two first floor window openings on the rear elevation of the main
building would be converted to a door and an existing door opening
would be infilled to create a window. 
Several sections of stonework would be either cleaned or repaired
while the slate roof would be renewed and solar panels would be
installed on the rear roof plane. 
An access ramp would be installed to the south of the property and
decorative railings would be installed along the southern site
boundary. A tree would be felled to accommodate the access ramp. 
Finally, areas of both hard and soft landscaping would be formed

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
across the application site. 
In light of the minimal removal of some of the existing building, and in
line with the Scheme of Delegation the application is being referred to
Board for consideration and determination.   
SITE HISTORY Application No: 23/0504/LB
Description: Installation of replacement windows and doors, solar
panels, two ramps, railings, cladding and a false floor. Erection of
extension; formation of window and door openings; renewal of roof;
stonework repairs; internal alterations and landscaping works
Decision: This application is also being presented to Board today for
determination.
 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – has no comments to make on the proposals. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
National Planning Framework 4
Policy 1 - Tackling the climate and nature crises
Policy 2 - Climate mitigation and adaptation
Policy 7 - Historic assets and places
Policy 9 - Brownfield, vacant and derelict land and empty buildings
Policy 11 - Energy
Policy 27 - City, town, local and commercial centres
 
Renfrewshire Local Development Plan 
Policy C1 - Renfrewshire's Network of Centres
Policy ENV3 - Built and Cultural Heritage
Policy I4 - Renewable and Low Carbon Energy Developments
 
New Development Supplementary Guidance
Delivering the Centres Strategy
Delivering the Environment Strategy
 
Material Considerations
A Guide to Development in Conservation Areas 2022
Historic Environment Scotland: Managing Change in the Historic
Environment Guidance
 
PLANNING
ASSESSMENT
The main issues that must be assessed in this report are the impact
the development would have on Paisley Town Centre and on the
Conservation Area. The impact on the building's listed building status
will be assessed in the associated listed building consent application
(23/0504/LB) which is also being presented to Board today.

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
In respect of the impact on the Town Centre, Policy 27 of NPF4 and
Policy C1 of the LDP both support development that will strengthen
and enhance Town Centres as long as the proposal is compatible with
surrounding land uses. The New Development Supplementary
Guidance recognises Paisley Town Centre's role as a learning hub. 
The application site sits within the University of the West of Scotland
campus, with numerous educational buildings found nearby. The
proposal would improve access to, as well as the layout and fabric of,
this vacant building, allowing it to be brought back into use for
educational related purposes. The proposal therefore complies with
Policy 27 of NPF4 and Policy C1 of the LDP. 
Furthermore, as the proposal would result in the reuse of a vacant
listed building it is also considered to comply with Policy 7 and Policy
9 of NPF4 in this regard. 
In respect of the impact on the Conservation Area, Policy 7 of NPF4
and Policy ENV3 of the LDP both support the safeguarding of
Conservation Areas. Furthermore, Renfrewshire’s New Development
Supplementary Guidance, as well as Historic Environment Scotland's
guidance notes, require proposals to preserve the character of the
Conservation Area. The following matters therefore require further
consideration, 
Extension and cladding
The construction of the extension would require the removal of several
small structures that sit between the main building and the rotunda.
These are poor quality, piecemeal additions that contribute little to the
Conservation Area. The removal of these structures is therefore
considered acceptable. 
The extension has been designed to fill the gap between the rear of
the main building and rotunda without dominating the space. The
extension would not be highly visible from the street and raises no
overlooking or overshadowing concerns. 
The extension would be finished in aluminium cladding, in contrast
with the sandstone main building and red brick rotunda. Such a finish
is acceptable as it would allow the extension to be identified as a later
addition and would link the structure to the more modern buildings
found elsewhere on campus. 
The aluminium cladding used on the extension would continue along
part of the northern side elevation of the rotunda. This is acceptable
as this elevation is not highly visible from elsewhere within the
Conservation Area and the original red brick finish has already been
removed in this location. 
Replacement windows and new window openings
While guidance from Historic Environment Scotland encourages the

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
retention and repair of existing windows and doors, it also
acknowledges that in some circumstances it is necessary to replace
them. In this instance, the existing single glazed frames have reached
the end of their working life. 
The replacement windows and door would be timber framed, double
glazed units that closely mirror the style, opening mechanism and
colour of the existing frames. This work would therefore have minimal
impact on the character  of the Conservation Area. 
Replacing single glazed windows with double glazed windows would
also comply with Policy 1 and Policy 2 of NPF4 in that their
installation would improve the energy efficiency of the building. 
The windows that would be formed on the southern elevation would
be of an appropriate size for the location, would help activate what is
currently a windowless gable elevation and would add to the character
of the area. The aluminium frames and shuttering are also considered
acceptable and would not be detrimental to the character of the
Conservation Area. 
Rotunda roof access
Access arrangements onto the rotunda roof do not comply with
current accessibility standards. The existing ramp would therefore be
removed and a new ramp installed, emerging from the centre of the
rear elevation of the main building at first floor level. A false floor
would be formed on the rotunda roof to allow the pitch of the ramp to
be reduced while new, taller, railings would be installed to protect
those using the roof as an outdoor space. 
Repositioning the ramp so that it sits centrally and the associated
alterations to first floor window and door openings would improve the
symmetry of the rear elevation and would be more in keeping with
how the building would have originally looked. 
The new ramp and railings would have a negligible impact on the
quality of the Conservation Area as they would replace existing
structures of a similar design while the false floor would not be highly
visible. 
No details have been provided on how the external appearance of the
building will be made good following the alterations to the window and
door openings. To protect the Conservation Area it is therefore
considered appropriate to add a condition, should consent be granted,
requesting that details of the materials to be used are submitted to,
and approved by, the Planning Authority before any work begins. 
Access ramp, railings and landscaping
The access ramp to be installed to the south of the building would
allow step free access into the building and would be of a standard
size and design.

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
Initially, it was proposed that 4.3 metre high aluminium curtain walling
would be installed along the southern site boundary. However,
following discussions between planning and the applicant this was
reduced to a 2.5 metre high decorative railing so that the rotunda
remains visible to those entering the campus from Storie Street. The
railing would be of a similar design to those installed on the ramps and
rotunda roof, minimising the material palette used for the development
and therefore its impact on the Conservation Area. 
The areas of hard and soft landscaping to be formed across the
application site would complete the development and improve the
setting of the building. The landscaping works and railings would also
help create a more welcoming environment at the Storie Street
campus entrance. A condition can be added to ensure the quality of
the landscaping is appropriate for a Conservation Area. 
Roof, solar panels and stonework
The roof would be stripped back and renewed, with the slate that is in
the best condition retained and used on the principal elevation. The
use of the original slate on the main elevation, which is of greatest
architectural significance, is welcome and a condition can be added to
ensure the slate used on the rear elevation is appropriate for the
location. 
The solar panels would be installed on the rear roof plane so they
would not affect the principal elevation and would not be highly visible
from the Conservation Area. As the panels would generate renewable
energy for the property this element of the proposal would also comply
with Policy I4 of the LDP as well as Policy 1, Policy 2 and Policy 11
of NPF4. 
The stonework cleaning and repairs would be carried out in a
sensitive, non invasive manner. It would not attempt to make the
building look new but would instead address defects such as cracking,
decay and areas of water ingress. This work would therefore improve
the quality of the building and the contribution it makes to the
Conservation Area. 
Overall, it is therefore considered the proposal complies with Policy 7
of NPF4, Policy ENV3 of the LDP and the associated supplementary
guidance as the development would respectfully alter the building to
allow it to meet the needs of the applicant while protecting the
contribution it makes to the wider Conservation Area. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Planning permission should therefore
be granted subject to conditions. 
RECOMMENDATION Grant, subject to conditions

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
Reason for Decision 
1. The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Conditions/Reasons 
1. Prior to the commencement of development hereby approved, full details of the
finishing materials to be used for the extension shall be submitted to, and approved
by, the Planning Authority.  Thereafter only the approved materials shall be used.   
Reason:  To safeguard the character of the Conservation Area. 
2. Prior to the commencement of development hereby approved, full details of the
design of and finish to the aluminium framed windows and their shutters as well as
all ramps, railings and the false floor on the rotunda roof shall be submitted to, and
approved by, the Planning Authority. Thereafter only the approved materials shall
be used.   
Reason:  To safeguard the character of the Conservation Area. 
3. Prior to the alteration of openings at first floor level necessary for the removal of the
existing ramp and installation of the new ramp approved, details of the materials
that will be used to repair the external appearance of the property in this location
shall be submitted to, and approved by, the Planning Authority. Thereafter only the
approved materials shall be used.   
Reason:  To safeguard the character of the Conservation Area. 
4. Prior to the commencement of development hereby approved, full details of any
new slate to be used shall be submitted to, and approved by, the Planning
Authority.  Thereafter only the approved slate shall be used. 
Reason:  To safeguard the character of the Conservation Area. 
5. For the avoidance of doubt, any slate vents shall be installed on the rear elevation
only.   
Reason:  To safeguard the character of the Conservation Area. 
6. Prior to the commencement of development hereby approved, a scheme of
landscaping shall be submitted for the written approval of the Planning Authority.
The scheme shall include (a) details of any earth moulding; (b) full details of the
finish to any areas of hard landscaping; (c) a scheme of tree and shrub planting,
incorporating details of the number, species, size and spacing of trees and shrubs
to be planted; and (d) details of the phasing of all works.   
The approved landscaping scheme shall thereafter be implemented in accordance
with the phasing plan.   
Reason: In the interests of visual amenity.

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
Local Government (Access to Information) Act 1985 - Background Papers
For further information or to inspect any letters of objection and other background papers,
please contact James McCafferty on 0141 487 1366