Planning Application: Report of Handling 
Reference No.   23/0136/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 1 – Renfrew
North and Braehead 
Applicant: Park Lane
Group/Sanctuary
Scotland 
Registered: 16.03.2023 
 
RECOMMENDATION 
Grant subject to
conditions and a Section
75 agreement 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising 24 flats (within two four storey
blocks) and associated access, parking, and landscaping. 
LOCATION: Site on North Western Boundary of No 2 Row
Avenue, Renfrew 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The application site is designated as a Commercial
Centre under Policy C1 of the Adopted Local
Development Plan.
 Residential development for the site has previously
been approved under planning application
19/0860/PP.
 There have been no letters of representation.
 There have been no objections from consultees.
 A Section 75 agreement is required to ensure
delivery of affordable homes on the site. 
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 23/0136/PP 
SITE ADDRESS  Site on North Western Boundary of No 2 Row Avenue, Renfrew
PROPOSAL  Erection of residential development comprising 24 flats (within two
four storey blocks) and associated access, parking, and landscaping. 
RECOMMENDATION Grant subject to conditions and a Section 75 agreement 
PROPOSALS This application seeks planning permission for the erection of a
residential development comprising of 24 flats with associated access,
parking, and landscaping at a vacant site off Row Avenue in Renfrew. 
The application site extends to approx. 1.9 hectares in area, and
comprises of rough grassland with a pockets of tree coverage
primarily within the eastern half of the site. The site is bound by
Dobbie’s Garden Centre to the north, the roundabout between Kings
Inch Drive and Row Avenue to the east, Row Avenue to the southeast
with a restaurant and hotel beyond, the A8 to the southwest, and an
access to the Diageo bottling plant to the west. 
A residential development for the site has previously been approved
through application 19/0860/PP which was for 18 flats and 39
dwellinghouses. The 18 flats are within two blocks each of which is
three stories in height. 
For the purposes of this application the proposed flats are on the
same footprint as the approved layout associated with the 19/0860/PP
application i.e. one block at the eastern edge of the site adjacent to
the roundabout, and one block at the western edge adjacent to a
SUDS pond. However, the flats are now proposed to be four stories in
height. The addition of an extra storey provides for 24 flats across the
two blocks, a net increase of 6 flats from the 19/0860/PP permission. 
The flats incorporate dual pitched roofs finished in concrete tiles, with
facing brick and metal cladding to the external walls. This application
also includes the access, parking and landscaping associated with the
flats.   
This report relates to an application that would normally fall within the
Council's scheme of delegation to be determined by an appointed
officer. However, a request has been submitted by three members,
within 21 days of the application appearing on the weekly list, that the
matter be removed from the scheme of delegation for determination
by the Board. It was considered that the potential impact of
surrounding land uses on the environment and amenity within the
development required it to be fully considered prior to any decision
being made. 
SITE HISTORY Application No: 19/0860/PP

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
Description: Erection of residential development comprising 18 flats
and 39 dwellinghouses
Status; Granted subject to conditions. 
Application No: 19/0697/EO
Description: Request for screening opinion as a requirement for a
Environmental Impact Assessment relating to the erection of
residential development
Status; Environmental Assessment not Required. 
Application No: 19/0577/NO
Description: Erection of residential development
Status; Accepted. 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – No objection subject to conditions relating to noise, air quality
and land contamination. 
Chief Executive’s Service (Roads Development) – Comments
made with regard to a connecting cycle link to the A8, cycle storage,
turning heads, grit bins, resident and visitor parking standards, and bin
presentation points. 
Children’s Services – No objections. 
Transport Scotland – No objections. 
Scottish Water – No objections. 
Glasgow Airport Safeguarding – No objections. 
NATS – No objections. 
REPRESENTATIONS  None received. 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations 
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan 
National Planning Framework 4
Policy 3 – Biodiversity
Policy 6 – Forestry, woodland, and trees
Policy 9 – Brownfield land, vacant and derelict land, and empty
buildings
Policy 13 – Sustainable transport

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
Policy 14 – Design, quality, and place
Policy 15 – Local living and 20 minute neighbourhoods
Policy 16 – Quality Homes
Policy 18 – Infrastructure first
Policy 22 – Flood risk and water management
Policy 27 – City, Town, Local and Commercial Centres 
Renfrewshire Local Development Plan 
Policy C1 – Commercial Centre
Policy I1 – Connecting Places
Policy I3 – Flooding and Drainage
Policy I7 – Zero and Low Carbon Buildings
Policy P3 – Housing Mix and Affordable Housing
Policy ENV2 – Natural Heritage
Policy ENV5 – Air Quality 
Supplementary Guidance
Delivering the Centres Strategy
Delivering the Places Strategy
Delivering the Infrastructure Strategy
Delivering the Environment Strategy 
Material Considerations
Renfrewshire’s Places Residential Design Guide – March 2015
 
PLANNING
ASSESSMENT
This application seeks to amend the development approved under
planning application 19/0860/PP. As the amendment is material it has
been submitted as a separate stand-alone planning application.
However the applicant has advised that the site will be developed in a
single phase, and the layout or roads infrastructure and residential
properties around the flatted blocks will remain consistent with that
approved under the 19/0860/PP application. 
The material change refered to is the addition of an extra storey onto
the two flatted blocks. This will increase the height of the flats from
three to four storeys, resulting in a net increase of six additional units
at the site. The flatted blocks are positioned at the eastern and
western sides of the layout in that the same position as the layout
approved under 19/0860/PP. 
The application site is within the Braehead Retail Park Commercial
Centre as defined by Policy C1. The principle of residential
development at this site has been established through the approval of
planning application 19/0860/PP. For the purposes of application
19/0860/PP it was noted that residential development on the site
would assist in creating sustainable mixed communities and a diverse
network of places to live and work. It was not considered that the loss
of the site for commercial purposes would have a detrimental impact
on the commercial centre or the wider network of centres, given the
expanse of Braehead and its range of retail and commercial offerings. 
The principle or residential development at the site has previously

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
been established and accepted with respect to Policy C1. On this
basis the addition of a further six units at the site is also considered to
be acceptable in principle. 
Policy 27 seeks to ensure that centres are vibrant, accessible, and
resilient, and that development is directed to the most sustainable
locations that are accessible by a range of sustainable transport
modes. Policy 27 provides support for new build residential
development within centres providing residential amenity is
considered fully, and provision of residential uses will not undermine
that character or amenity of the centre. I am satisfied that the
residential development proposed at the site is compatible with Policy
27 in principle. 
Policy 9 supports the reuse of brownfield, vacant and derelict land.
The proposed development will regenerate a vacant site. 
Policy 9 states that the biodiversity value of brownfield land which has
naturalised should be considered. The site mainly comprises of rough
grassland however there are also areas of tree coverage particularly
within the eastern half of the site. 
It is noted that planning permission has already been approved to
clear the site and remove all trees. For the purposes of this
application, stipulations can be put in place via condition to ensure
that the landscaping scheme for the site provides suitable
compensation for the value of the habitat being removed. 
Policy 13 and I1 both seek to ensure good accessibility to walking,
cycling and public transport routes. 
The previously approved layout included a 3m wide cycle route to
connect the site with the walking and cycling infrastructure on Kings
Inch Road. It is noted that Kings Inch Road benefits from segregated
walking and cycling infrastructure which will facilitate onward journeys
to Braehead. The 3m wide link also connects the site to the public
transport links on Kings Inch Road. 
The site is considered to benefit from good accessibility to walking,
cycling and public transport routes. 
Policy 15 seeks to promote local living whereby residents would be
able to meet most daily needs within a reasonable distance of their
home. 
The application site is a 20 minute walk from Braehead Shopping
Centre. The site is connected to Braehead via segregated walking and
cycling infrastructure and public transport as noted above. The
amenities within Braehead Commercial Centre (including Sainsburys,
IKEA, Dobbie’s, the hotel, and associated restaurant) are also within a
20 minute walk.

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
The site is located on the edge of the catchment areas and over 1
mile from St James’ Primary School and Kirklandneuk Primary
School. Children will be eligible for home to school transport. There
are public transport connections from the site to secondary schools,
open space and play areas at Clydeview Park, and Renfrew Health
Centre. 
On balance it is considered that the development aligns with the
concept of local liveability and is in a location whereby daily needs of
residents can be met without reliance on private transport.     
It is acknowledged that the site does not incorporate an equipped play
area as per planning consent 19/0860/PP. The applicants have
advised that they do not intend to install an equipped play area.
However a non-equipped play area of open space with planting could
be created as part of the landscaping strategy.    
Policy 14 seeks to promote well designed development that makes
successful places. 
The scale of the proposed four storey blocks will not have a
detrimental impact on the character of the area. There are other large
buildings in the immediate area including the adjacent hotel which is
also four stories. The block at the eastern side of the site will be more
visible given its prominent location at the roundabout. This block fronts
the street in a positive manner and will contribute positively to the built
environment. 
Finishing materials remain consistent with those approved under
application 19/0860/PP. 
The infrastructure required to support the flatted blocks has been
accommodated appropriately within the site layout. This includes
residents parking (which remains at 100% provision in line with the
standard set under application 19/0860/PP), visitor parking,
landscaping, and bin stores. 
The potential impact on the amenity of neighbouring properties within
the layout approved by the 19/0860/PP must also be considered. 
The nearest properties to block 2 are plots 48-51 and 32. The front
elevation of plots 48-51 directly face block 2 from the north east.
However, there is a separation distance of 23m between the blocks.
This is sufficient to ensure that there will be no significant loss of
amenity with respect to loss of daylight, overshadowing, or privacy. 
The side elevation of plot 32 is 13m to the south east of block 2. As
the side elevation of plot 32 is blank there will be no loss of privacy
within habitable rooms associated with the property. The 13m
separation is also considered sufficient to ensure that privacy within
the rear garden will not be significantly impacted by the proposed
flats. There are also no overshadowing concerns as the flats are to

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
the north of plot 32. 
The nearest properties to block 1 are plots 13-16 which are positioned
to the south west. The south west elevation of block 1 is 8m from the
rear boundary and 18m from the rear elevation of plots 13-16. 
The window to window separation distance between block 1 and plots
13-16 ensures that adequate levels of privacy within habitable rooms
will be maintained. There will be no overshadowing of plots 13-16
given the position and orientation of the blocks. 
The proximity of block 1 to the rear boundary of plots 13-16 will result
in overlooking of rear garden ground. However the developer has
altered the fenestration on the rear elevation of block 1 to reduce the
impact. The alteration comprises the deletion of one living room
window, and the repositioning of a bedroom window to the side
elevation. 
In view of the above I am satisfied that the proposed development will
not have a significant detrimental impact on the amenity of residential
properties approved under the previous application.             
With respect to noise impact, the Environmental Protection Team
have requested an updated noise impact assessment to ensure that
recommended mitigations for the second floor flats (as approved
under previous application 19/0860/PP) can be replicated within the
additional third floor flats to offer the same level of mitigation and
ensure that internal levels will meet target levels. 
It is noted that the requirement can be added as a condition. It is also
recommended that the noise condition attached to the 19/0860/PP
consent is also attached to the current application.   
Policy ENV5 requires that development proposals should not have a
significant adverse effect on air quality particularly within or adjacent
to Renfrewshire’s Air Quality Management Areas. 
It is noted that an Air Quality Assessment was undertaken for the
previous application 19/0860/PP, and it was conclude that the
development would not have a detrimental impact on air quality.   
For the purposes of this application an update to the previously
approved Air Quality Assessment is required to ensure that the
proposed development of a net additional six units does not have a
detrimental impact on local air quality objectives. If a detrimental
impact is predicted, then mitigation measures will be required. The
update can be submitted via condition. 
It should be noted that the scope of Policy ENV5 refers to impact of
the development on air quality, as opposed to the impact of existing
air quality on the proposed development.

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
Policy 16 seeks to encourage, promote, and facilitate the delivery of
more high quality, affordable and sustainable homes in the right
locations and across a range of tenures. 
Policy P3 also seeks to ensure that development proposals provide a
mix of housing types and tenures to meet current and future needs. 
The proposed development will deliver 24 flats. These will contribute
to the mix of 39 semi-detached and terraced dwellinghouses approved
under application 19/0860/PP. 
A Section 75 agreement will be used to ensure a 25% affordable
housing requirement is met. 
The development will deliver a mix of properties at an appropriate
location in accordance with Policies 16 and P3. 
The developer will be required to provide a statement confirming the
technology incorporated into the design, construction, and operation
of the flats to reduce predicted emissions by at least 15% below 2007
building standards as required by Policy I7. 
A surface water management strategy for the site was approved as
part of application 19/0860/PP. For the purposes of this application
the footprint of the flats is not being enlarged from the previous
approval. However, there may be an increase in impermeable surface
area associated with the additional car parking spaces and bin
storage areas. A revised surface water management strategy will
therefore be requested via condition to ensure compliance with
Policies 22 and I3. 
The application site is not at risk of flooding from river or coastal
sources as per SEPA flood risk maps. 
The northwestern corner of the site is within a Control of Major
Accident Hazard Zone (COMAH) boundary. However, none of the
flats being proposed fall within this boundary. 
There have been no letters of representation received in relation to
the application. 
In response to the points raised by consultees which have not already
been addressed above, a site investigation and remediation strategy
will be requested via condition to ensure the site is made suitable for
use. 
Locations for grit bins and bin presentation points have been
incorporated into the proposed layout. 
There is no requirement for a turning head as development of the site,
including the loop road approved under application 19/0860/PP, will
be brought forward as a single phase of development.

Page 9

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
Details of cycle storage provision will be requested via condition. 
The applicant has asserted that level changes make delivery of a
connecting cycle link to the A8 difficult to implement. It is also noted
that a link was not requested as part of the previous application. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Planning permission should therefore
be granted. 
RECOMMENDATION Grant subject to conditions and a Section 75 agreement.
 
 
Reason for Decision
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. No development shall commence on site until written approval of: 
a)  a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended
therein
b)  a Remediation Strategy and Implementation Plan setting out the proposed methods
for implementing all remedial recommendations contained with the site investigation
report prepared in accordance with current authoritative technical guidance, has
been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
2. Prior to occupation of any of the flats hereby approved, a Verification Report confirming
completion of the works specified within the approved Remediation Strategy and
Implementation Plan and also confirming that imported materials are suitable for use
shall be submitted to the Planning Authority and approved in writing. 
Reason: To demonstrate that works required to make the site suitable for use have been
completed 
3. That prior to any of the flats hereby approved being occupied, the developer shall submit
a specification detailing the final location and design of the bin stores to serve the flats.
The approved stores shall thereafter be installed prior to any of the flats being occupied,
and maintained thereafter for the duration that the flats are occupied.

Page 10

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10
 
Reason: To ensure the bin stores are of a suitable design and finish in the interests of
visual amenity. 
4. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority a strategy for the sustainable drainage of
surface water. Only the approved strategy shall thereafter be implemented on site. 
Reason: To ensure surface water is managed appropriately in the interests of
sustainable drainage. 
5. That prior to any of the flats hereby approved being occupied, the developer shall submit
a specification detailing the final location and design of all bike stores to serve the flats.
The approved stores shall thereafter be installed prior to any of the flats being occupied,
and maintained thereafter for the duration that the flats are occupied. 
Reason: To ensure suitable provision for bike storage at the development in the
interests of supporting sustainable transport. 
6. That prior to the commencement of development on site, the developer shall provide a
specification for the written approval of the Planning Authority detailing the location,
design, materials and colour of all boundary fences, gates, walls (including retaining
walls), or other method of enclosure to be installed at the site. Only the boundary fences,
gates, walls, or other methods of enclosure within the approved specification shall
thereafter be used in the development of the site. 
Reason: To ensure the methods of enclosure are of a suitable design in the interests of
visual amenity. 
7. No development shall take place until full details of soft and water landscaping works
have been submitted to and approved in writing by the Planning Authority. The details
must comply with Advice Note 3 ‘Potential Bird Hazards from Amenity Landscaping and
Building Design’, and shall include. 
 Details of any existing trees or hedgerows and methods for their protection during the
construction phase.
 The species, number and spacing of all proposed trees, shrubs, hedgerows, areas of
grass/wildflower seeding, and turfing.
 Drainage details including SUDS – Such schemes must comply with Advice Note 6
‘Potential Bird Hazards from Sustainable Urban Drainage Schemes.
 All areas of hard standing including location and materials.
 All areas of surface water including ponds, and measures for the sustainable
management and drainage of surface water where applicable. 
 All biodiversity and habitat enhancements to ensure there is no net biodiversity loss
at the site.
 Details of a Local Area for Play with associated landscaping for natural play.
 A timetable for the implementation of the soft and water landscaping works.
 A strategy for the future management and maintenance of all landscaped areas
including provision for replacement of trees, shrubs, hedgerows and areas of

Page 11

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11
 
grass/wildflower seeding and turfing if they were to become diseased, die, become
seriously damaged or are removed within 5 years of being planted. 
The scheme shall thereafter be implemented as approved. No subsequent alterations to
the approved landscaping scheme are to take place unless submitted to and approved
in writing by the Planning Authority in consultation with Glasgow Airport. 
Reason: To avoid endangering the safe movement of aircraft and the operation of
Glasgow Airport through the attraction of birds and an increase in the bird hazard risk of
the application site. 
8. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority an addendum to the Noise Impact
Assessment, ref AS 0766 Braehead Renfrew and dated 2 November 2020 which
demonstrates that that the recommended mitigations for the second floor flats can be
replicated within the additional third floor flats to offer the same level of mitigation and
ensure that internal levels will meet target levels. The addendum shall include any
additional mitigations as required to ensure target internal noise levels are met. 
Reason: In the interests of residential amenity.
9. Prior to occupation of any unit within the development hereby approved, the developer
shall submit for the written approval of the Planning Authority, a final Verification Report
to demonstrate that all mitigation measures identified within the Noise Impact
Assessment, ref AS 0766 Braehead Renfrew and dated 2 November 2020 and the
associated addendum report required via condition 8 have been implemented. 
Reason: In the interests of residential amenity. 
10. That prior to the commencement of development on site, the developer shall submit for
the written approval of the Planning Authority a report which satisfies the Planning
Authority that the Local Air Quality Management Objectives for the pollutants specified in
the relevant Air Quality Regulations, made under Part IV of the Environment Act 1995,
shall not be exceeded at any location at or in the vicinity of the development where
“relevant exposure” is liable to occur. In addition, the overall significance of the air
quality impacts from the development shall be assessed and clearly defined within the
report with mitigation proposed where required. The survey and report shall adhere to
the methods and principles set out in the Scottish Government publication “Local Air
Quality Management Technical Guidance LAQM.TG(09) and LAQM.TG(16)” and the
EPUK guidance document “Land-Use Planning & Development Control: Planning for Air
Quality (Jan 2017)” or a method that has been agreed with the Planning Authority. If the
report concludes that Local Air Quality Management Objectives will be exceeded, it shall
include appropriate recommendations (and a timetable for the implementation of the
recommendations) to ensure that the impact of exceeding the objectives is mitigated.
The recommendations shall thereafter be implemented in accordance with the timetable
unless otherwise agreed in writing with the Planning Authority. 
Reason: To ensure Local Air Quality Management Objectives are managed in the
interests of public health.