Renfrewshire Council Planning and Climate Change Policy Board Page 1
Planning Application: Report of Handling 
Reference No.   22/0481/PP
 
Agenda Item ( ) 
KEY  INFORMATION 
Ward: 10 – Houston,
Crosslee and Linwood 
Applicant: McTaggart
Construction 
Registered: 05/07/2022 
 
RECOMMENDATION 
Approve subject to
conditions and Section
75 legal agreement. 
 
 
 
 
 
Report by Head of Economy & Development 
PROSPECTIVE PROPOSAL: Erection of residential
development comprising 64 dwellings with associated road
and drainage infrastructure. 
LOCATION: Former St Brendan’s Social and Recreation
Club, Stirling Drive, Linwood 
APPLICATION FOR: Full Planning Permission 
© Crown Copyright and database right 2021. All rights reserved. Ordnance Survey Licence number 100023417. 
IDENTIFIED KEY ISSUES 
 The application site is identified as a Housing Land
Supply Site and is covered by Policies P1 and P2 of
the adopted Local Development Plan. 
 There have been two letters of representation. 
 There have been no objections from any
consultees. 
 A Section 75 agreement is required to secure
delivery of affordable homes on the site and secure
a contribution towards play provision. 
 
 
Alasdair Morrison
Head of Economy &
Development

Page 2

Renfrewshire Council Planning and Climate Change Policy Board 
Page 2
 
REPORT OF HANDLING FOR APPLICATION 22/0481/PP 
SITE ADDRESS  Former St Brendan’s Social and Recreation Club, Stirling Drive,
Linwood 
PROPOSAL  Erection of residential development comprising 64 dwellings with
associated road and drainage infrastructure. 
RECOMMENDATION Grant subject to conditions and Section 75 legal agreement. 
PROPOSALS Planning permission is sought for the erection of a residential
development of sixty four units, comprising cottage flats, a bungalow,
wheelchair access properties and general needs housing, for a local
registered social landlord, with associated access and drainage
infrastructure at the former St Brendans Social and Recreation Club
Stirling Drive, Linwood. 
The application site extends to approx. 2.17 hectares in area. The
footprint of the former recreation club is visible on the western half of
the site. The eastern half of the site features areas of grassland and a
redundant multi use games area. There are two clearly defined
footways through the eastern half of the site. They are arranged in a Y
shape linking Stirling Drive with Clippens Road and Cowal Drive. The
areas of grassland, the path network and the Stirling Road frontage of
the site are lined by mature trees. 
The site is bound by residential development to the north, south, east
and west, with commercial uses to the north east, including a Public
House and retail units, on Clippens Road.   
The proposed development provides a frontage along Stirling Drive
and Muirhead Drive. The interior of the site is laid out around a central
loop road, with the sole vehicular access from Stirling Drive. Additional
pedestrian footpaths are proposed east to Clippens Road, and south
to Cowal Drive. The footpaths are located within landscaped corridors.
There is also a SUDS area proposed within the central loop road. 
The proposed layout comprises a mix of bungalows, semi detached
and terraced dwellinghouses, and cottage flats which will be managed
by a Registered Social Landlord. 
SITE HISTORY Application No: 22/0301/EA
Description: Request for Screening Opinion for proposed residential
development.
Decision: Environmental Assessment not Required. 
Application No: 22/0150/PN
Description: Erection 64 dwellinghouses.
Decision: Accepted 
CONSULTATIONS Communities & Housing Services (Environmental Protection
Team) – No objection subject to conditions relating to the installation

Page 3

Renfrewshire Council Planning and Climate Change Policy Board 
Page 3
 
of the 2m acoustic fence, and the requirement for a site investigation
and remediation strategy to address potential land contamination. 
Chief Executive’s Service (Roads Development) – No objections
subject to conditions requiring: 
- the submission of a street lighting design to include footpath
connections to Clippens Road, Cowal Drive and Muirhead Drive, and
a revised street lighting design for Stirling Drive. 
- that all footpath connections to Clippens Road, Cowal Drive and
Muirhead Drive shall be resurfaced to an adoptable standard 
- visitor bays when entering the site be relocated to a more
appropriate location; 
- all access’s and driveways shall be formed as per the National
Roads Development Guide; 
- parking to be provided as per the National Roads Development
Guide;   
- the submission of a Construction Traffic Management Plan, and; 
- the submission of details of traffic calming and pedestrian crossings
(uncontrolled) on Stirling Drive. 
Children’s Services – No objection subject to a contribution in
respect of education provision.   
SEPA – No comments. 
Scottish Water – No objection. 
The Coal Authority – No objection. 
Glasgow Airport Safeguarding – No objection subject to condition
relating to the submission of a landscaping scheme. 
REPRESENTATIONS  Two letters of representation have been received which object to the
proposed development. The points raised in the letters are
summarised below. 
1 – Loss of daylight and overshadowing 
2 – Noise during building works 
3 – Loss of privacy 
4 – Traffic and safety

Page 4

Renfrewshire Council Planning and Climate Change Policy Board 
Page 4
 
5 – Loss of green space 
DEVELOPMENT PLAN
POLICIES
Policy and Material Considerations 
Legislation requires planning decisions to be made in accordance with
the Development Plan unless material considerations indicate
otherwise. In this instance, the proposal must be assessed against the
following: 
Development Plan 
National Planning Framework 4 
NPF4: Policy 1 – Tackling the climate and nature crisis
NPF4: Policy 3 – Biodiversity
NPF4: Policy 6 - Forestry, woodlands and trees
NPF4: Policy 9 – Brownfield land, vacant and derelict land, and empty
buildings
NPF4: Policy 13 – Sustainable transport
NPF4: Policy 14 – Design, quality, and place
NPF4: Policy 15 – Local living and 20 minute neighbourhoods
NPF4: Policy 16 – Quality Homes
NPF4: Policy 18 – Infrastructure first
NPF4: Policy 20 – Blue and Green Infrastructure
NPF4: Policy 21 – Play, recreation and sport 
Renfrewshire Local Development Plan 
LDP 2021: Policy P1 – Renfrewshire’s Places
LDP 2021: Policy P2 – Housing Land Supply Sites
LDP 2021: Policy P3 – Housing Mix and Affordable Housing
LDP 2021: Policy P5 – Green/Blue Network
LDP 2021: Policy P6 – Open Space
LDP 2021: Policy I1 – Connecting Places
LDP 2021: Policy I3 – Flooding and Drainage
LDP 2021: Policy I7 – Zero and Low Carbon Buildings
LDP 2021: Policy I8 – Developer Contributions
LDP 2021: Policy ENV2 – Natural Heritage 
Supplementary Guidance 
Delivering the Environment Strategy
Delivering the Infrastructure Strategy
Delivering the Economic Strategy 
Material Considerations 
Renfrewshire Councils Residential Design Guide 
Scottish Government publications on Designing Streets and Designing
Places
Renfrewshire Planning & Development Tree Policy - 2022

Page 5

Renfrewshire Council Planning and Climate Change Policy Board 
Page 5
 
 
PLANNING
ASSESSMENT
The application site is covered by Policies P1 and P2 of the Adopted
Renfrewshire Local Development Plan (2021). In accordance with the
Local Development Plan, housing would be an appropriate use which
would contribute towards meeting Renfrewshire’s Housing Need and
Demand. 
The principle of the proposal, redeveloping a vacant, previously used
site in the middle of an existing place, would also be in line with
Policy 9 and the Spatial Strategy outlined in the Adopted
Renfrewshire Local Development Plan, ensuring that brownfield land
in Renfrewshire’s existing places was used before green field land or
green belt.   
Policy P3 set out in the Adopted Renfrewshire Local Development
Plan is also applicable to the assessment of the proposals, as it seeks
to ensure that on residential sites, a mix of housing types are
encouraged to meet current and future housing needs and support
sustainable mixed communities in Renfrewshire. 
In this regard, the entire development would be for a local social
registered landlord and would therefore comprise an entirely
affordable housing development, in compliance with Policy P3. 
It is considered that proposals demonstrate that they meet local
housing need and demand by including a range and choice of types
and sizes of units. This includes housing for older people and less
able residents in the flatted properties and bungalow on the ground
floor. 
It is considered that there is a mix of housing on this site which will
add to the overall housing mix in the area. The proposal complies with
Policy P3. 
The redevelopment of the site for residential use would comply with
the development plan in principle. However detailed consideration of
the proposed development against the provisions of the New
Development Supplementary Guidance and the Residential Design
Guide is required. 
These documents set out a range of considerations that form the
basis of good places design. Each consideration will be assessed in
turn. 
Context and Character 
The application site is located within an urban area predominantly
characterised by two storey terraced and three storey flatted
residential properties. The dominant finishing material is roughcast.
However, there are some brick buildings on Cowal Drive to the south
which adds variety to the streetscene. A local service centre which

Page 6

Renfrewshire Council Planning and Climate Change Policy Board 
Page 6
 
houses a mix of retail, professional and food related uses bounds the
site to the northeast. 
The application site has previously been developed. Although the
previous buildings have been demolished, the platforms are still
visible. However, it is noted that previous buildings did not occupy the
full extent of the site. The site also has areas of grassland and mature
trees. There is also play equipment visible towards the southern
boundary. There is also a well-defined network of footways through
the site.   
Access and Connectivity 
Policy 15 advocates local living to encourage connected and compact
neighbourhoods where people can meet most daily needs within a
reasonable distance of their home. Policies 13 and I1 advocate good
accessibility and connectivity to walking, cycling and public transport. 
The application site benefits from a range of amenities and services
within a 20 minute walk or cycle. These include the local service
centre which bounds the site to the north east, Woodlands and Our
Lady of Peace Primary School to the east, Linwood and St Benedicts
High School to the west, public transport connections along Clippens
Road which provides onward connectivity to Linwood town centre and
Paisley, and the National Cycle Network to the south west. 
The proposed layout has one singular vehicle point of access onto
Stirling Drive. However the proposed layout ensures the existing
network of footways is retained, with footway connections to Clippens
Road, Cowal Drive and Muirhead Drive. This will enhance
permeability and ensure appropriate accessibility for pedestrians and
cyclists is retained.     
The Roads Development Officer has offered no objections to the
development subject to the imposition of a range of conditions. These
include measures for traffic calming and pedestrian crossing along
Stirling Drive. The implementation of these measures will further
enhance accessibility to the site for pedestrians.   
Layout and Built Form 
The layout integrates into the existing street network via the provision
of an active frontage onto Stirling Drive and the north west end of
Muirhead Drive. It will contribute positively to the place and the
streetscene along these external frontages. 
Internally the layout of the site is focused around the loop road. The
loop road makes suitable provision for pedestrian movement via 2m
footways to both sides of the road. There is also provision for traffic
calming and visitor parking. 
The SUDS pond is centrally located within the layout. This is

Page 7

Renfrewshire Council Planning and Climate Change Policy Board 
Page 7
 
welcomed as the SUDS pond will contribute positively to the character
of the area, its landscape setting, and biodiversity. The footpath links
to the east and south are also set within landscaped corridors.   
Environment and Community 
The reuse of brownfield sites is supported by Policy 9. However as
noted above, the site also accommodates natural heritage assets in
the form of mature trees and open grassland areas on the eastern half
of the site. 
Policies 20, P5 and P6 seek to safeguard areas of open space and
the green network. The open space is considered to be of amenity
value, while the mature trees provide a landscaped setting to the
space and contribute positively to the streetscene. 
It is acknowledged that as the development will result in the loss of
this open space it does not fully comply with policies 20, P5 and P6.
However the overriding factor in this instance is the sites P2
designation, and the delivery of affordable homes in a sustainable
location. This is considered to justify the loss of the open space. It is
noted that there are other areas of open space within walking distance
of the site. 
Policy 6 and ENV2 and the Councils planning and development tree
policy seek to ensure that due consideration is given to the
safeguarding of trees as part of the proposed layout. Policy 3 also
seeks to enhance biodiversity. 
The tree survey submitted with the application notes a total of 99
individual trees and 5 distinct tree groups. The individual trees are
mostly of moderate quality, with 7 outstanding specimens and 28 low
quality specimens recorded. The surveyed groups were predominantly
of moderate quality. It is noted that the groups all include Ash trees
which are showing signs of Ash dieback disease. 
The proposed landscaping scheme indicates that only two existing
trees will be retained. The scheme makes provision for 74 new trees
to be planted. The locations of the proposed trees are split between
communal areas and front gardens. 
The proposed development has not made provision for retention of
the trees on the site. It has also not made provision for compensatory
planting of equal number. However, this must be balanced against the
desirability of delivering affordable homes on a previously developed
site within a sustainable location. 
The applicant will deliver 74 trees within the proposed landscaping
layout for the site, and the proposed landscaping scheme is
considered to be acceptable with respect to the enhancing the
amenity within the residential layout. However, there is shortfall of 23
trees in comparison to the number of trees currently on the site. In this

Page 8

Renfrewshire Council Planning and Climate Change Policy Board 
Page 8
 
instance it is considered acceptable for these 23 trees to be planted in
an off-site location again with respect to the desirability of providing
affordable homes on the site. 
It is also noted that the development will result in the loss of play
equipment at the site. There is no play equipment being proposed
within the development. However, the applicant has agreed to
contribute towards the installation of play equipment at an off site
location.     
The Councils Play and Assets Officer has advised that plans are
being developed for a new play area on land to the north of Gilmartin
Road. This play area would be suitably located within a 10 minute
walk of the application site via Pentland Avenue. 
The applicant has agreed in principle to providing a contribution
towards development of this play area. The contribution would also
factor in the requirement for off-site tree planting which can be
undertaken as part of the delivery of the play area. This process can
be managed via a Section 75 legal agreement and would allow the
development to proceed in accordance with policies 18 and 21. 
Children’s Services have noted that they offer no objection subject to
a developer contribution being made in respect of education provision.
Policy I8 notes that contributions will be sought where there is an
identified shortfall in infrastructure capacity as a result of the new
development.   
The proposed development includes a sustainable strategy for
drainage of surface water via a network of permeable paving, the
central detention basin, and filter trenches. It is noted that surface
water would ultimately drain into the existing public network. It is
therefore recommended that the drainage scheme is not implemented
until the applicant demonstrates that it has been approved by Scottish
Water. It is noted that Scottish water have not objected to the number
of units being proposed in terms of water supply and foul network
capacity. 
The proposed layout has been reconfigured to mitigate noise impact
from the adjacent local service centre. It also now includes a 2m high
acoustic barrier along the north-eastern boundary. A condition will be
used to ensure the acoustic barrier is installed on site prior to the
adjoining dwellinghouses being occupied. 
Each plot within the development benefits from a sufficient area of
useable garden ground. Plot depths have also been configured to
ensure that privacy is maintained within each property. Garden ground
will not be overlooked to an unacceptable degree. There are no
instances where overshadowing or loss of daylight is likely to occur to
a degree that would significantly impact amenity.     
With regard to the amenity of existing properties that border the

Page 9

Renfrewshire Council Planning and Climate Change Policy Board 
Page 9
 
development site, there is a 22m separation distance between the
rear elevation of the properties on Muirhead Drive and the properties
on the western edge of the development. The properties on the
southern boundary have a minimum garden depth of 9.5m. This is
sufficient to ensure that existing properties on Cowal Drive and Morar
Drive will not be overlooked or overshadowed to an unacceptable
degree.   
It is noted that the layout specifies the requirement for a retaining wall
along the southern and western boundaries of the site.  The applicant
has provided section drawings to illustrate the relationship between
the retaining wall and neighbouring properties at the points where the
retaining wall would be highest. These sections demonstrate that the
retaining wall and associated boundary treatment will not have an
unacceptable impact on the outlook or the amenity of the
neighbouring properties. 
Buildings and Design 
The development incorporates a mix of one bedroom flats, and two
and three bedroom houses. The majority of the buildings are two
storey, with one wheelchair accessible bungalow being proposed.
Finishing materials comprise a mix of facing brick and render to the
walls, with concrete tiles to the roof. Active gable windows are
included on plots which overlook footways or open space. 
A Section 75 agreement will be used to ensure a 25% affordable
housing requirement is met. 
The development will deliver a mix of properties at an appropriate
location in accordance with Policies 16 and P3. 
The application also includes a Energy Design Analysis which
demonstrates that the requirements of policy I7 will be met through
improving the dwelling fabric performance prior to considering
additional energy efficiency measures   
The development will ensure that quality homes are delivered as per
the requirements of policy 16. A condition can be applied to ensure
that a final materials specification is submitted for approval. 
The proposed development will support delivery of two of the
overarching spatial principles set out in National Planning Framework
4 – Local Living and Compact Urban Growth. The application site is
within a sustainable location, and its redevelopment in the manner
proposed will contribute positively to the place. A Section 75
agreement will be used to ensure payment of a commuted sum in
respect of play equipment and biodiversity net gain. 
In response to the points raised in the letters of objection. 
1 and 3 – Matters relating to the potential impact on amenity of

Page 10

Renfrewshire Council Planning and Climate Change Policy Board 
Page 10
 
neighbouring properties has been addressed in the foregoing
assessment. 
2 – Noise levels during construction work can be controlled through
the submission of a Construction and Environmental Management
Plan. 
4 – The Roads Development Officer has not objected to the
development on the grounds of traffic or safety. 
5 – Loss of the existing green space has been addressed in the
foregoing assessment. 
In view of the above, it is considered that the proposal would accord
with the relevant provisions of the Development Plan. There are no
other material considerations. Planning permission should therefore
be granted. 
RECOMMENDATION Grant subject to conditions and a Section 75 legal agreement.  
Reason for Decision 
The proposal accords with the provisions of the Development Plan and there were no
material considerations which outweighed the presumption in favour of development
according with the Development Plan. 
Conditions 
1. That prior to the commencement of development on site, the developer shall
provide a specification for the written approval of the Planning Authority detailing
the location, design, materials and colour of all boundary fences, gates, walls, or
other method of enclosure to be installed at the site. This includes the 2m acoustic
fence and any retaining walls. Only the boundary fences, gates, walls, or other
methods of enclosure within the approved specification shall thereafter be used in
the development of the site. For the avoidance of doubt the 2m acoustic fence shall
be fully installed before any of the properties on plots 1, 2 and 16-25 (inclusive) are
occupied. 
Reason: To ensure the methods of enclosure are of a suitable design in the
interests of visual amenity, and that noise mitigation is in place prior to the
occupation of plots closest to the noise source. 
2. That prior to the commencement of development, a Construction Environmental
Management Plan (CEMP) shall be submitted to and approved in writing by the
Planning Authority.  The CEMP shall include (but not be limited to) provisions in
respect of:  
 mitigation measures for potential dust, noise, and vibration impacts on nearby
properties, 
 waste management, pollution control and mitigation, 
 a plan showing existing drainage pipes and other utilities within the site and
procedures for how they will be safeguarded during construction,

Page 11

Renfrewshire Council Planning and Climate Change Policy Board 
Page 11
 
 surface water management,
 procedures for monitoring compliance and dealing with any breaches of the
approved management plan,
 the formation of access from the public road to accommodate construction
vehicles including geometry, surfacing, and sightlines
 the additional signage on both public roads where access will be taken to
inform drivers of the construction vehicles.
 details of proposed temporary site compound for storage of materials,
machinery, and designated car parking. 
The measures set out within the approved CEMP shall thereafter be implemented
on site during the construction phase 
Reason: To ensure environmental impacts are mitigated during the construction
phase, and that the construction phase is undertaken safely. 
3. That prior to the commencement of development on site, the developer shall
provide for the written approval of the Planning Authority a specification detailing
the colour and texture of all finishing materials to be used on the external walls of
the building hereby approved. This shall include windows and all rainwater goods
The specification shall also provide confirmation of all properties within the layout
which are to have an active gable elevation, and thereafter confirm the design of
the gable elevation. Only the materials within the approved specification shall
thereafter be used in the development of the site. 
Reason: To ensure the external materials are suitable for use in the interests of
visual amenity. 
4. No development shall take place until full details of soft and water landscaping
works have been submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport Safeguarding. The details must comply with
Advice Note 3 ‘Potential Bird Hazards from Amenity Landscaping and Building
Design, and shall include the following. 
 Confirmation of all existing trees, hedgerows, and other vegetation on the site,
those that will be retained and measures for their protection during the
construction phase, and those that shall be removed to accommodate the
development. 
 
 The species, number and spacing of all proposed trees and shrubs. 
 Details including SUDS – such schemes must comply with Advice Note 6
‘Potential Bird Hazards from Sustainable Urban Drainage Schemes’. 
 All areas of hard standing including location and materials. 
 A timetable for the implementation of the landscape strategy. 
 A strategy for the future management and maintenance of all landscaped
areas (including SUDS infrastructure) including provision for replacement of
trees, shrubs, hedgerows and areas of grass/wildflower seeding and turfing if
they were to become diseased, die, become seriously damaged or are

Page 12

Renfrewshire Council Planning and Climate Change Policy Board 
Page 12
 
removed within 5 years of being planted. 
No subsequent alterations to the approved landscaping scheme are to take place
unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented in
accordance with the timetable, and maintained thereafter in accordance with the
maintenance strategy. 
Reason: To ensure an appropriate scheme of landscaping is developed in the
interests of visual amenity and the residential environment, and to avoid
endangering the safe movement of aircraft and the operation of Glasgow Airport
through the attraction of birds and an increase in the bird hazard risk of the
application site. 
5. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil, water
and gas contamination within the site); and, if remedial works are recommended
therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the site
investigation report prepared in accordance with current authoritative technical
guidance, 
has been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
6. Prior to occupation of any unit: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; and/or 
b) where remediation works are not required but soils are to be imported to
site, a Verification Report confirming imported materials are suitable for use 
shall be submitted to the Planning Authority and approved in writing. 
Reason: To demonstrate that works required to make the site suitable for use have
been completed. 
7. That prior to the commencement of development on site, the developer shall
provide a plan for the written approval of the Planning Authority which specifies the
following improvement works: 
 A street lighting design to include the proposed footpath connections to
Clippens Road, Cowal Drive and Muirhead Drive, and a revised street lighting
design for Stirling Drive to ensure the proposed footway fronting Stirling Drive
is sufficiently illuminated 
 The upgrading of any retained sections of footpath forming the connections to

Page 13

Renfrewshire Council Planning and Climate Change Policy Board 
Page 13
 
Clippens Road, Cowal Drive, and Muirhead Drive.
 
 Details of traffic calming and pedestrian crossings (uncontrolled) on Stirling
Drive. 
The plan shall also include a timetable for the completion of these works. The
approved works shall thereafter be implemented in accordance with the approved
timetable to the satisfaction of the Planning Authority. 
Reason: To ensure the site can be accessed by pedestrians in a safe manner. 
8. That prior to the commencement of development on site, the developer shall
provide confirmation to the Planning Authority that Scottish Water have approved
the drainage layout for the site and the associated connection to the public
drainage network. Only the approved drainage strategy shall thereafter be
implemented at the site. 
Reason: To ensure surface water is managed appropriately.