Page 1

2 
PUBLIC 
___________________________________________________________________
To:  Planning and Climate Change Policy Board
On:  17 March 2026
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: National Planning Improvement Framework – Improvement Action
Progress Update 2025
___________________________________________________________________
1. Summary
1.1 This report seeks to provide an update to members on the progress made in
respect of the action plan which was agreed as part of the National Planning
Improvement Framework (NPIF) in 2024.  
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board: 
▪ Note that the Council’s Planning Service has prepared an Improvement
Action Progress Update which has been agreed by the National Planning
Improvement Champion. 
▪ Note the progress made in respect of the various workstreams which are
identified within the Action Plan of the National Planning Improvement
Framework. 
▪ Note that a further update will be provided in 2027.
_________________________________________________________
3. Background 
3.1 The Planning (Scotland) Act 2019 introduced a new approach to measuring the
performance of planning authorities and made it mandatory for planning
authorities to prepare a report on their performance after the end of each
financial year.

Page 2

3
PUBLIC
3.2 The Act also introduced the role of the National Planning Improvement
Champion to monitor the performance of planning authorities and provide
advice to them, and other persons considered appropriate, on the steps that
might be taken to help improve performance. 
3.3 The NPIF has been developed by the National Planning Improvement
Champion and aims to “manage the development and use of land in the long
term public interest through” ensuring that: 
▪ the planning system enables the delivery of sustainable, liveable, and
productive places.
▪ planning services are equipped to work effectively and efficiently,
embedding continuous improvement.
▪ users are able to engage constructively with the planning system and
planning service.
3.4 Our NPIF Report was agreed in November 2024 and included an action and
improvement plan which would be implemented over a three-year period.  The
NPIF Report was presented to members at the November 2024 meeting of the
Planning and Climate Change Policy Board.
3.5 The action and improvement plan requires to be implemented over a three-year
period.
3.6 As part of the National Planning Improvement Framework an annual report
requires to be prepared which details the progress made in respect of the
various workstreams identified within the action and improvement plan.
___________________________________________________________________
4. Year 2 Update
4.1 The Improvement Action Progress Update 2025 represents our year 2 report
as required by the National Planning Improvement Framework.
4.2 A copy of our Improvement Action Progress Update 2025 is detailed within
Appendix 1 of this report.
4.3 The action and improvement plan is divided into five key areas as follows:
▪ People
▪ Culture
▪ Tools
▪ Engage
▪ Place

Page 3

4
PUBLIC
4.4 Most of the identified action points remain in progress, however it is significant
to note that the following action points have been completed:
▪ Appointment of designated Enforcement Officer.
▪ Introduction of customer service survey in relation to the preparation of the
local development plan/local place plans.
▪ Publication of guidance relating to education contributions.
▪ Investigate how to proceed in respect of flooding advice.
4.5 The remaining actions will be implemented over the remaining two years of the
adopted National Planning Improvement Framework and a further update will
be provided in 2027. 
__________________________________________________________________
Implications of the Report
1. Financial – None.
2. HR & Organisational Development – None
3. Community/Council Planning – None.
4. Legal – None.
5. Property/Assets – None.
6. Information Technology – None.
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report
8. Health & Safety – None.
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None.
12. Climate Risk – None.
13. Children’s Rights - None
14. Cosla Policy Position – None.
Author:      David Love, Chief Planning Officer.
Tel: 07483410182; Email: david.love@renfrewshire.gov.uk

Page 4

NATIONAL PLANNING IMPROVEMENT FRAMEWORK
Improvement Action Progress
Update 2025
Renfrewshire Council
Appendix 1

Page 5

Renfrewshire NPIF Annual Report (Year Two -
2025)
Foreword
Over the past year, following the completion of our National Planning Improvement
Framework (NPIF) and our peer review session, we have sought to progress and implement
our agreed Improvement Action Plan.
At the outset we would note the challenging circumstances we have experienced over the
past year especially in relation to our Business Admin Support Team. As a result of limited staff
resource and staff absence within our support team, a number of officers have experienced
increased workloads and pressures including Planning Assistants and Planning Officers. In
addition, workload demand and pressures relating to complex and major developments have
also had an impact upon our ability to progress some actions within the Action Plan.
In addition to the above, the Planning and Building Standards Service have been reporting to
an internal officer Board of the Council – the Performance Board.  The Performance Board has
enabled a detailed evaluation of many of our processes and procedures, and we are pleased
that a number of workstreams have been commenced and progressed as a result of our work
with the Performance Board.  Many of the workstreams align with actions outlined in our
Improvement Action Plan and are detailed in relation of the respective action point.  
Notwithstanding the above, we are pleased to report that our Developer Contributions
(Education) Planning Guidance was adopted at a meeting of the Planning and Climate Change
Policy Board in August 2025. 
Progress has also been made in relation to many of our other action points and although not
completed to date we look forward to completing them in the coming year. Our professional
development plan process is about to be implemented and as such this process has been
progressed in partnership with our colleagues in Environment, Housing and Infrastructure. All
staff within the planning service will now complete the review and discuss matters with their
manager setting individual goals and action points.
Our review of processes is ongoing and continues to help enhance our procedures. Over the
past year improvements and enhancements have included new decision notice templates
together with the introduction of formalised assessment processes and decision notices
relating to applications for treeworks, notification of works to trees in a conversation area,
proposal of application notices, EIA Screening opinions, non-material variations and discharge
of conditions. Work is continuing and a review of our procedures in relation to planning
enforcement has highlighted and identified a number of areas of improvement as we seek to
streamline and enhance our processes in respect of enforcement matters. This includes
drafting a suite of bespoke enforcement related notice templates and associated letters and
coding/embedding these into our Uniform. In addition, we are pleased to be working with
colleagues from our IT team to investigate and implement, where possible, the automation of
some tasks thus helping to save staff time which can be diverted to other tasks.

Page 6

We remain committed to ensuring that the planning process is transparent and accessible to
all and draft guidance has been prepared in relation to the introduction of hearings at
meetings of the Planning and Climate Change Policy Board. The introduction of hearings
would enable applicants and those making representations to address the board as part of
the consideration of the respective planning application. Further work requires to be
undertaken with our colleagues in legal and committee services however we hope to be in a
position to introduce hearings early in 2026.
Challenges remain within the service in relation to staff resource; however, we are currently
preparing a business case in respect of seeking additional staff, firstly in relation to our
Business Admin Support Team and thereafter in addition officers. Additional staff across the
service will enable us to continue to progress the Improvement Action Plan but also enable us
to improve and enhance our performance as we seek to promote quality developments across
Renfrewshire.
Introduction
The National Planning Improvement Framework (NPIF) was piloted incrementally in three
separate cohorts throughout the 2024/25 financial year. This was to test a new approach to
measuring the performance of planning authorities. The pilot aimed to test the new
framework, to explore what works and what doesn’t. This resulted in each planning authority
producing an improvement action plan and performance assessment.
Each improvement action plan sets out:
• What the planning authority has agreed as its priority activities
• Whether these have short-, medium- or long-term timescales
• The owner of the actions
• The resources needed
Link to action plan for 2023/24.  
In year two of the NPIF the planning authorities are to update on their progress with the
improvement actions. This report sets out the progress Renfrewshire has made, detailing any
updates to actions, any further actions and plans for further collaboration with peer partners.
Planning Improvement Actions Progress
Update
This section details each of the improvement actions and the progress the planning
authority has made.

Page 7

Renfrewshire has 21 improvement actions. The status of the actions is shown
below: 
Action 1: Prepare a formal workforce strategy document
detailing the adopted approach of grow our own
In Progress
Progress against this action: The Planning and Building Standards Service has been subject to
review and evaluation by an internal board of the Council – the Performance Board.  The
Performance Board has considered all aspects of our operations and as such as identified and
enabled a number of recommendations to be made in respect of our workforce.  
Although the preparation of a formal workforce strategy has not yet been completed it is
significant to note that a number of improvements points have already been realised as we
seek to grow our own. Firstly, we created a new role within the Planning Service – Planning
Trainee. The trainee role combines study at the University of the West of Scotland (UWS) one
day per week together with on-the-job training on the other four days.  The UWS course
represents a degree apprenticeship and seeks to equip candidates with the academic
qualifications while working within a planning authority. We are delighted to advise a Planning
Trainee commenced work with Renfrewshire Council in September 2025 and is currently
working within our Strategy and Place Team while meeting the study and assessment
requirements of the UWS course.  
A number of improvements from a workforce perspective have also been identified in relation
to our Business Support Officers. The officers are currently based within the respective
planning and building standards teams however the current set up lacks resilience, capacity
and flexibility to meet service demands and in this regard, we have adopted a new approach
with the creation of a new Planning and Building Standards Business Support Team. This new
team will bring together all support officers and will help create a more resilient and flexible

Page 8

team which will be able to adapt to challenging work periods or indeed periods of staff leave
or absence. In addition, the new approach introduces two new positions within the team –
team leader and task leader. The newly created roles will assist with the co-ordination and
management of the team while also increasing the capacity within the team. As part of the
grow our own model we currently have one trainee working within the team as we seek to
provide opportunities for those seeking work or a return to work while also enhancing our
capacity.
In respect of professional posts within the Planning Service a number of recommendations
have been made, and a formal proposal has been submitted which is currently under
consideration. The proposal would result in an increase in the number of posts within
Development Management Team while also providing an opportunity for promotion within
the Strategy and Place Team. It is envisaged that should financial approval be achieved; the
additional posts will be recruited in early 2026.
The following next steps are proposed: In order to progress matters and to create and
establish the Planning and Building Standards Business Support Team, formal recruitment
processes will be undertaken and thereafter the team established. Similarly, should approval
be granted for additional posts within the respective planning teams the relevant recruitment
processes will be commenced at the earliest opportunity.
The formal workforce strategy document will include all the improvements noted above and
will be progressed at the same time as the corporate approach to workforce strategy
progresses.    
Action 2: Re-introduction of Professional Development
Plans of all staff
In Progress
Progress against this action: The PDP document had been created in collaboration with
colleagues in Environment, Housing and Infrastructure and seeks to provide staff a
comprehensive opportunity to review their development and training needs for the short,
medium and long term. The PDP aims to assist, motivate and support staff to achieve
continuous professional development. Testing of the PDP has been undertaken with
colleagues from ICT with a view to enabling the process to be undertaken online this allowing
reports and action lists to prepared. The PDP will be implemented in early 2026 with all staff
required to complete the document prior to discussing matters in further detail with their line
manager. 
The following next steps are proposed: The PDP process will be implemented in early 2026
and all staff within Planning and Building Standards will be required to complete the document
and discuss matters with their line manager. Thereafter an annual review will be undertaken
in order to best support staff with their own professional development plans.

Page 9

Action 3: Introduction of Staff Survey to determine training
needs and other matters
In Progress
Progress against this action: We are currently at the early stages of undertaking a staff
survey to determine training needs. It is envisaged that the survey will complement the
introduction of Professional Development Plans and help to fully support all staff in
maintaining and enhancing their skills and knowledge and also helping staff to achieve their
professional development goals.
The following next steps are proposed: We will follow up with our HR colleagues prior to the
staff survey going live. Thereafter the survey will go live and will be open for staff to complete
for two weeks.
Action 4: Review scheme of delegation as it relates to
planning matters and make changes as required
Not Started
Reason(s) action has not been progressed:
• The action was set as a low or medium priority
To date Action 4 has not been progressed as the action was identified as a low or medium
priority.  In this regard, it should be noted that initial discussions have been undertaken with
the Convenor however it is considered that may be better for such discussions to take place
after next local government elections in 2027.  
The following next steps are proposed: Further discussions will be undertaken following the
local government elections in 2027.
Action 5: Review Board timetables and operation of the
board including introduction of hearings and the policy
relating to site visits
In Progress
Progress against this action: Action 5 has been progressed however to date it has not been
completed. An outline guide of how hearings could be introduced to the meetings of the
Planning and Climate Change Policy Boards has been prepared. In addition, discussions have
been undertaken with the Convenor and Deputy Convenor of the Board and colleagues from
Legal Services and Committee Services. To date a final decision has not yet been reached in
respect of the introduction of the Hearings.
The introductions of hearings will also have an impact on the existing site visit protocol and in
this regard should it be decided to introduce hearings, the site visit protocol will be re-

Page 10

considered and amended as required. To is envisaged that should hearings be implemented,
the new site visit protocol will be implemented at the same time.  
The following next steps are proposed: Further internal discussions require to be undertaken,
and considerations given to the wider implications of the introduction of hearings at the
Planning and Climate Change Policy. Thereafter it is envisaged that a report will be prepared
which will be considered by Elected Members at a meeting of the Planning and Climate
Change Policy Board.
Action 6: Training programme for elected members
In Progress
Progress against this action: The training programme for members in recent months has
focused upon LDP matters including National Planning Framework 4, the LDP preparation
process and the evidence report. In addition, sessions have also been held in respect of the
Developer Contributions – Education. A more formal training programme will be implemented
throughout 2026 and ahead of the requirement for Elected Members to undertake necessary
training.  
The following next steps are proposed: A formal programme of training will be prepared and
circulated in the coming weeks. It is envisaged that the necessary Elected Member training
will be implemented following the local government elections in 2027. Going forward the
necessary training will be supplemented with additional training as required in respect of
various topics.  
Action 7: Increase capability within the Strategy & Place
team to undertake more GIS work
In Progress
Progress against this action: A member of the Strategy & Place team was one of a limited
number of attendees from Scottish planning authorities who attended Improvement Service
GIS training. The training was useful and has been practically applied to support the team. The
GIS module has been a significant part of the trainee planners course work on the UWS
planning course. Regular (fortnightly) meetings with the Council’s corporate GIS team have
been re-established. Strategy & Place staff have had ArcGIS Pro software installed on devices
to enable them to undertake relevant training and work. Staff have become more skilled in
the creation and management of ArcGIS tools such as Survey123 and hubs.
The following next steps are proposed: A purpose of the meetings with the corporate GIS team
is to discuss what additional GIS work can be undertaken by the Strategy & Place team rather
than requested from the corporate GIS team.

Page 11

Action 8: Commence preparation of a data strategy for the
planning service and identify planning representative to
engage with corporate Data Advisory Group
In Progress
Progress against this action: Action 8 is in progress, and the Chief Planning Officer is now a
member of the Data Advisory Group which has been set up within the Council. The formal
strategy document has not yet commenced due to availability of staff resource and as such it
is recommended that the timeframe is updated to medium.   
The following next steps are proposed: To prepare the data strategy in respect of the Planning
Service.  The data strategy will be included in the workplan for the next financial year
2026/2027.
In response, the following changes to the action are proposed: Update the timescale to
medium.
Action 9: Put in place designated Enforcement Officer
Complete
What was the outcome of completing this action?
Following a number of recruitment attempts, a Planning Officer with dedicated focus on
Enforcement matters was appointed in November 2025. The officer in question is now leading
on all enforcement matters and reviewing our internal processes. The officer will take a lead
role in the review of our Enforcement Charter later this year.  
Action 10: Review Uniform workflow processes/letters and
templates
In Progress
Progress against this action: Our workflow process as they relate to development
management matters have been reviewed from start to finish including all template letters,
notifications and reports. The work date includes:
• Review of all workflow process and generated tasks within the uniform system.
• Review of all template letters, acknowledgements, notification and reports.
• Introduction of formal application process relating to discharge of conditions, non-
material variations, pre-application enquiries, notification of initiation of
development, notification of completion of development etc.
In addition, as part of our internal review with the Council’s Performance Board we are also
progressing the use automation within the uniform system. The Council are currently testing
the use of an automated robot undertaking and completing rule-based tasks such as sending
acknowledgment and notification letters and data entry.

Page 12

The use of Artificial Intelligence is also being progressed throughout the Council with the
introduction of the Council’s AI powered digital assistant – Millie. The digital assistant seeks
to help customers get faster responses to routine queries and reduce pressure on staff. As part
of the wider roll out, Millie is currently being adapted to deal with enquiries relating to
Planning and Building Standards. It is envisaged that the introduction of Millie will respond to
enquiries more efficiently while also creating additional time for staff to process applications.
Link to more details on Millie.
The Council’s Performance Board has also included a review of our Business Support Staff and
in this regard a number of amendments are currently being implemented. The introduction
of a dedicated Business Support Team serving both Planning and Building Standards will help
provide clear and consistent reporting, while also removing single points of failure and indeed
increase resilience within the service. The dedicated team will include the appointment of a
Team Leader and Task Leader, while the four Senior Clerical posts (currently split between the
respective Planning and Building Standards Teams) will be made permanent and sit within the
same team. The dedicated team within increased staff resource will assist in reducing the time
officers undertake administration and seeks to enhance performance by maximising the time
spent processing applications. The long-term aim is for the Business Support Team to
undertake initial validation of applications.  
The following next steps are proposed: A number of steps have been identified:
• The continued evolution of the uniform system and the review of tasks to help
drive performance.
• The instruction of more formal and automated procedures in respect of Planning
Enforcement.
• The introduction of automation within the uniform system following detailed
testing.
• The introduction of Millie to be the first point of contact when seeking call Planning
and Building Standards.
• The formation of the dedicated Business Support Team. Recruitment of the team
is due to take place in February/March 2026.
Action 11: Review of Board and LRB procedures 
In progress
Progress against this action: This action has been progressed at the same time as Action 5
given it covers many similar issues. As previously noted, work has commenced in respect of
the operation of our Planning and Climate Change Policy Board in that consideration is being
given to the introduction of hearings and the operation of the wider Board. This action has
not yet concluded however it will be progressed following further discussions with the
Convenor and thereafter any changes will be considered by the Planning and Climate Change
Policy Board. 
The following next steps are proposed: We will engage with legal and committee services in
order to progress the review and make recommendations on the operation of the board and
implement agreed changes.

Page 13

Action 12: Review and refresh all planning webpages on the
Renfrewshire Council website
In Progress
Progress against this action: Limited progress has been made to date due to staff resource and
availability. The roll out of the new Renfrewshire Council website has commenced and as a
result the priority of reviewing and renewing our webpages has increased. 
An initial review of our existing pages has taken place and as such it is the intention to prepare
the content for our new webpages over the next ten months. In addition, views were sought
on the content of development planning related webpages as part of the 2025 Development
Plan Scheme consultation. Responses were limited but did provide some useful feedback.
The following next steps are proposed: A timetable of implementation will be prepared and
agreed and thereafter we will liaise with our communication colleagues to update our
webpages.
Action 13: Introduce a customer service survey measuring
satisfaction with the level of collaboration in the preparation
of the local development plan/local place plans
Complete
What was the outcome of completing this action?
A survey was issued alongside the draft 2025 Development Plan Scheme seeking views on
satisfaction with opportunities to input to the new local development plan, and how to
improve opportunities. Unfortunately, only nine responses were received (9), with the
majority indicating they were dissatisfied (4) or very dissatisfied (1) and providing reasons
why. The same survey sought views on the frequency of local development plan
communications, with the majority of responses (5) indicating the frequency was about right.
Some of the suggestions received were reflected in the updated Development Plan Scheme
and Participation Statement.
Action 14: Identify gaps in responses to the have your say
survey from places and groups, and run targeted
consultations to address this
In Progress
Progress against this action: The 2025 Development Plan scheme identifies children and
young people, disabled people, older people, local interest groups (e.g. natural and built
environment groups) and gypsy/travellers and travelling show people as groups that are to be
engaged with during the preparation of the proposed plan. There are also areas of
Renfrewshire that will not be covered by a Local Place Plan where an alternative approach to
engagement will be required.

Page 14

The following next steps are proposed: Engagement with these groups and areas will form
part of the proposed plan preparation process.
Action 15: Regular engagement events with stakeholders and
customers to include: - Developers Forum - Community
Council Visitations
In progress
Progressed against this action: To date this action has not yet been completed however plans
are currently being progressed in relation to a Developers Forum taking place later this year.
The Developers Forum would provide the opportunity for the Planning Service and Developers
to engage and discuss pertinent issues including those relating to processes and procedures.
In terms of Community Council visitations, Officers continue to attend meetings of Community
Councils where invites are received and remain committed to attending such meetings as
required. In addition, Officers also attend meetings of Local Partnerships throughout
Renfrewshire as required to provide updates relating to particular projects.  
A monthly drop-in session is held for those community councils and other community groups
that are preparing a Local Place Plan. These have proven to be a useful forum for those
organisations to ask questions directly of Council officers and each other.
The following next steps are proposed: We will confirm plans relating to our Developers Forum
and confirm arrangements.  The Developers Forum will be held later this year.
Action 16: Investigate use of customer questionnaire on issue
of decision notice, taking account of any national survey
implemented by NPI
Not Started
Reason(s) action has not been progressed:
• We are relying on a partner or stakeholder to action this
This action point has not yet been progressed and as such we have sought to rely upon the
national survey which was implemented by NPI.  In order to ensure we get the best possible
response to the NPI survey from a Renfrewshire perspective, efforts have been undertaken to
make applicants, developers and customers aware of the survey and to encourage
participation. 
The following next steps are proposed: On reflection it is considered that any Renfrewshire
specific survey is likely to replicate the work undertaking as part of the national survey. In this
regard it is our intention to continue to promote the national survey and indeed respond to
the outcomes highlight in respect of a Renfrewshire perspective.

Page 15

Action 17: Investigate charging for preapplication advice
Not Started
Reason(s) action has not been progressed:
• Other
The introduction of charging for pre-application advice has not yet commenced mainly as a
result of competing priorities and the ability to respond to increased expectations where
charging is associated with provide the service.  
The following next steps are proposed: Over the next year progress will be made in relation
to the introduction of a charging regime in respect of our pre-application service.  
Action 18: Seek discussion/ training session with
Improvement Service to provide planning staff with more
knowledge of the Place and Wellbeing Outcomes and how
these can be used in decision-making
In Progress
Progress against this action: Contact has been made with Irene Beautyman of the
Improvement Service who has agreed to provide a training session.
The following next steps are proposed: Confirmation of training session with Irene Beautyman
as part of a wider training event.
Action 19: Preparation of model template for legal
agreement and engagement with HOPS working group
Not Started
Reason(s) action has not been progressed:
• We do not have the resources we need to do this
• The action was set as a low or medium priority
To date no progress has been made in relation to the preparation of a model template. The
delay has been experienced as a result of staff resource pressures with legal services, however
it should be noted that the action was identified as low to medium priority.
The following next steps are proposed: We will engage with colleagues in legal services to
prepare a model template for legal agreements and take account of any recommendations
that come from the HOPS working group.

Page 16

Action 20: Publication of guidance relating to Education
contributions
Complete
What was the outcome of completing this action? 
Our Developer Contributions (Education) Planning Guidance was adopted in August 2025.
The guidance document is now a material consideration in the determination of planning
applications and is used by both Children’s Services in responding to consultation requests
and by Planning in reaching recommendation and decisions in respect of planning
applications.  
Action 21: Flooding Officer
Complete
What was the outcome of completing this action?
Discussions have been undertaken with a neighbouring local authority and the Planning Hub
in respect of a shared Flooding Officer Resource. As a result of the discussions and review of
current spend it was considered that a shared resource would not be viable and as such we
decided, for the time being, to continue to rely on external advice from relevant consultants.
Peer Collaborative Review Follow Up
As part of the pilot, each planning authority held a peer collaborative review workshop. This
brought together key stakeholders and customers to discuss and provide constructive
feedback on the improvement action plan.
Status of the peer review follow-up meeting: Staff resources are such that we are limited on
time at present. We hope to provide a further update in the near future.