Planning and Climate Change Policy Board: 20 January 2026
Report by Chief Planning Officer 
Reference No 22/0178/PP
Application Type Planning Permission
Proposal Residential development comprising fifty-seven dwellinghouses
and eighteen flats, including access, drainage, landscaping and
associated works
Location Site Between Sandieland Wood and Florish Road, Erskine
Ward 12 - Erskine and Inchinnan
Community Council Inchinnan Community Council
Applicant Trustees Of the Blyswood 1969 Trusts & Stewart Milne Group
Ltd.
Recommendation Grant Subject to Conditions & Legal Agreement
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=R8IQ8OMWFLB00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation. In this instance, the application relates to a major
development as defined within the Town and Country Planning (Hierarchy of Development)
(Scotland) Regulations 2009. 
Proposal
This planning application for this site was initially lodged in March 2022 by Stewart Milne
Homes (SMH), who subsequently entered administration in 2023. The application for the
erection of an 83 unit residential development was previously considered by the Planning
and Climate Change Policy Board in November 2022 where it was decided that the Board
were minded to grant planning permission subject to conditions and the conclusion of a
Section 75 legal agreement. However, the legal agreement was never concluded, and the
consent never issued, due to Stewart Milne going into administration. 
In 2025, Cala Homes assumed control of the site, with confirmation from the appointed
Administrator that the company was authorised to progress the planning application. Cala
Homes has submitted a revised site layout (amending the number of units and housing mix)
and a package of updated supporting documentation, which has been the subject of
appropriate statutory re-notification, re-advertisement and re-consultation alongside
additional courtesy notifications. Concurrently, the Council sought legal advice to determine
whether a new round of statutory pre-application consultation activity (associated with the
Proposal of Application Notice process) would be required, and were advised that no
additional requirements applied, as the existing application was being progressed. The
application has been assessed based on this updated information. 
This application seeks planning permission for the erection of a residential development
comprising of fifty-seven dwellinghouses and eighteen flats with associated infrastructure
and landscaping. 
Pedestrian and vehicular access would be taken from Florish Road to the west, with the
development structured around a permeable road layout.

Page 2

A mixture of two storey detached and terraced dwellinghouses would be located across the
site. Two blocks of three storey flats and associated parking would be located towards the
entrance of the development. The flats would be designated as affordable homes. 
A SUDS basin and children's play area would be located to the east of the site while soft
landscaping would be found throughout the development. 
Site Description
The application site extends to approximately 3.7 hectares and is located to the east of
Erskine. 
Residential properties are found to the north, south and west while agricultural land is found
to the east. The land is relatively flat but falls away gently to the east. 
The site is predominantly comprised of grassland or former farmland while trees are found
along the northern and western site boundaries. A small portion of Sandieland Wood, which
is protected by a Tree Preservation Order (TPO), is located within the eastern corner of the
site. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application. 
Discussions have taken place since CALA Homes assumed control of the site, focusing on
the position of individual dwellings within the layout, securing improved landscaping,
softening of the eastern site boundary and improving access arrangements into the play
area. 
Negotiated Improvements
Following CALA's submission, changes have been made to further reduce the extent of the
1.8 metre high timber fencing that would run along sections of the eastern site boundary
while additional improvements to the surrounding road and footway network have been
secured. 
Changes were also made during the assessment of the previous Stewart Milne submission,
with three revised layouts submitted throughout its consideration. Most notably, the blocks of
flats were repositioned from the south of the site to the entrance and a children's play area
was incorporated into the development. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 21/1587/PN 
Description: Erection of residential development including access, drainage,
landscaping and associated works
Decision: Accepted 
Application No: 21/1647/EA 
Description: EIA Screening Opinion
Decision: Environmental Assessment Not Required 
Application No: 23/0146/PP

Page 3

Description: Installation of surface water drainage outfall pipe to serve residential
development
Decision: Grant subject to conditions 
Consultations   
▪ The Mining Remediation Authority (formerly The Coal Authority) - no objection, subject to
an advisory note relating to potential coal mining related hazards. 
▪ National Air Traffic Services (NATS) - no objection. 
▪ West Of Scotland Archaeology Service (WoSAS) - no objection, subject to conditions. 
▪ Scottish Water - no objection. 
▪ Glasgow Airport Safeguarding - no objection, subject to a condition requiring the
submission of a Bird Hazard Management Plan. 
▪ Environment, Housing & Infrastructure (Environmental Protection) - no objection, subject
to conditions relating to the remediation of potentially contaminated land. 
▪ Chief Executive's (Roads Development) - no objection, subject to conditions and offsite
improvements such as the provision of a zebra crossing on Florish Road. 
▪ Education (Children's Services) - no objection, subject to a financial contribution in
respect of the impact the development would have on Park Mains High School and
Trinity High School. 
▪ NatureScot - no objection. 
▪ Inchinnan Community Council - object on procedural grounds and ecological impact. In
addition, the proposal has insufficient information to allow it to be fully assessed and
does not meet the requirements of various policies. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
The following representations were received following the initial notification and
advertisement process undertaken following the submission of the application by Stewart
Milne:
▪ Object – 54
▪ Support – 0
▪ Neutral – 0 
The following representations were received following the re-notification and re-
advertisement process carried out after the amendments to the application by CALA Homes:
▪ Object – 7
▪ Support – 0
▪ Neutral – 0 
The issues raised across all representations can be summarised as follows:
1. Nearby facilities such as schools, GPs and dentists are at capacity
2. Loss of greenbelt land
3. Negative impacts on biodiversity and wildlife
4. Loss of carbon sequestered at the site
5. Loss of native woodland and trees

Page 4

6. The ecological information provided by the applicant is insufficient
7. Noise pollution from the development
8. Air pollution issues caused by an increase in vehicles
9. Air pollution issues caused by the airport
10. Poor public transport connections to/from the site
11. Inadequate shopping and community facilities nearby
12. Lack of police presence
13. The roundabout is designed for cars, not active travel
14. Impact on views
15. The housing would not be affordable
16. Impact on privacy afforded to nearby houses
17. Construction would negatively impact residential amenity
18. The blocks of flats are too big for the location
19. The submitted plans are incorrect
20. The surrounding road network cannot accommodate additional vehicles
21. There is no demand for flats in the area
22. The proposal does not incorporate an adequate greenbelt buffer
23. The development would increase the risk of littering/dumping of waste
24. The development would increase the risk of fire setting
25. The cumulative impact of recent residential developments has not been considered
26. A new EIA screening opinion should be issued
27. The proposal would fragment existing habitats
28. No guarantee mitigation measures will be maintained in the long term or be effective
29. Compensatory planting would be insufficient and contains non-native specimens
30. The development should be set back from woodland habitat
31. Construction may damage nearby properties
32. The condition of the road surface at the roundabout is poor
33. Reports submitted by the applicant are out of date
34. Overshadowing concerns
35. The proposal would breach neighbouring resident’s human rights
36. No meaningful civic space within the area
37. The development is close to housing that is being built in Dargavel 
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the
development plan unless material considerations indicate otherwise. In this instance the
Development Plan consists of National Planning Framework 4 (NPF4) and the Renfrewshire
Local Development Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the
determination of this application: 
National Planning Framework 4  
▪ Policy 1 - Tackling the climate and nature crises
▪ Policy 2 - Climate mitigation and adaptation
▪ Policy 3 - Biodiversity
▪ Policy 4 - Natural places
▪ Policy 6 - Forestry, woodland and trees
▪ Policy 9 - Brownfield, vacant and derelict land and empty buildings
▪ Policy 11 - Energy
▪ Policy 12 - Zero waste
▪ Policy 13 - Sustainable transport
▪ Policy 14 - Design, quality and place
▪ Policy 15 - Local Living and 20 minute neighbourhoods
▪ Policy 16 - Quality homes

Page 5

▪ Policy 18 - Infrastructure first
▪ Policy 20 - Blue and green infrastructure
▪ Policy 21 - Play, recreation and sport
▪ Policy 22 - Flood risk and water management 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
▪ Policy ENV2 - Natural Heritage
▪ Policy P1 - Renfrewshire's Places
▪ Policy P2 - Housing Land Supply
▪ Policy P3 - Housing Mix and Affordable Housing
▪ Policy I1 - Connecting Places
▪ Policy I3 - Flooding and Drainage
▪ Policy I4 - Renewable and Low Carbon Energy Developments
▪ Policy I5 - Waste Management
▪ Policy I8 - Developer Contributions
Full details relating to the policies of the LDP can be found online. 
Other relevant policies and guidance
▪ Delivering the Infrastructure Strategy - Connecting Places
▪ Delivering the Infrastructure Strategy - Flooding and Drainage
▪ Delivering the Infrastructure Strategy - Renewable and Low Carbon
▪ Delivering the Infrastructure Strategy - Provision for Waste Recycling in New
Developments 
▪ Delivering the Infrastructure Strategy - Developer Contributions 
▪ Delivering the Places Strategy - Creating Places
▪ Delivering the Places Strategy - Open Space Provision in New Developments 
▪ Delivering the Environment Strategy - Trees, Woodlands and Forestry
▪ Delivering the Environment Strategy - Biodiversity
▪ Delivering the Environment Strategy - Natural Heritage
▪ Renfrewshire Planning and Development Tree Policy
▪ Scottish Government Planning Guidance: Biodiversity
▪ Renfrewshire's Places Residential Design Guide
▪ Site Development Brief: Land East of Florish Road, Erskine
▪ National Roads Development Guidance
▪ Renfrewshire Strategic Housing Investment Plan 2026 to 2031
▪ Letter from the Chief Planner and Minister for Public Finance - Planning for Housing
(June 2024)
▪ Letter from the Chief Planner and Cabinet Secretary for Housing - Housing Emergency
Action Plan & the Planning System (September 2025) 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
▪ Affordable Housing Statement - Sets out details of the affordable housing provision
within the development. 
▪ Arboricultural Impact Assessment (October 2025) - Provides justification for the works
required to implement the development and details how existing trees should be
protected during construction.

Page 6

▪ Bridgewater Housing Association Letter of Support (July 2025) - Outlines Bridgewater
Housing Association's support for the inclusion of 18 affordable flats within the
development. 
▪ Design and Access Statement (August 2025) - Explains the development parameters,
design concepts and principles that have shaped and informed a detailed layout for the
site. 
▪ Drainage Strategy Report (August 2025) - Examines existing drainage arrangements at
the site and sets out how the proposed drainage strategy would meet the requirements
of Renfrewshire Council, SEPA and Scottish Water. 
▪ Ecological Appraisal (July 2025) - Considers the impact the development would have on
the natural environment. 
▪ Education Planning Obligations Appraisal (August 2025) - Provides the applicant's
response to the Council's Developer Contributions (Education) Planning Guidance and
the relevant provisions of the Development Plan. 
▪ Flood Risk Assessment Report (August 2025) - Explores whether the development
would be at risk of flooding or increase the risk of flooding to others. 
▪ Florish Road Walkover (October 2025) - Presents the results of a walkover survey that
explored possible upgrades in the surrounding road and footway network. 
▪ Landscape & Visual Impact Assessment (LVIA) (August 2025) - Considers the impact of
the development on the wider landscape. 
▪ PAC Report (March 2022) - Provides details of the Pre Application Consultation process
and its outcomes. 
▪ Planning Statement (August 2025) - Provides justification for the proposal against the
relevant provisions of the Development Plan. Includes the applicant's Statement of
Community Benefit. 
▪ Report on Site Investigations (January 2022) - Considers the condition of the land in
respect of potential contamination and historic coal mining. 
▪ Transportation Assessment (August 2025) - Examines the impact the development
would have on the wider road network, explores possible active travel links and details
how the proposal would comply with relevant policies and guidance. 
▪ Tree Survey Report (October 2025) - Details the condition of trees found within the
application site boundary. 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any
Direction made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the
grant of planning permission) and Regulation 33 (Directions requiring consideration of
condition) of The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013, or under Regulation 50 (that development is EIA development)
of The Town and Country Planning (Environmental Impact Assessment) (Scotland)
Regulations 2017.

Page 7

None. 
Planning Assessment 
Introduction
The application site was allocated as a Policy P2 housing site with an indicative capacity of
90 units by the Scottish Government as part of their assessment of the adopted
Renfrewshire Local Development Plan (LDP). 
In response to the Council's previous concerns around the weakening of the greenbelt
boundary, the Scottish Government Reporter who examined the LDP noted that "given the
low lying nature of the site, together with a lack of visibility of the eastern edge of the site, the
potential for a loss of containment should not be a significant concern". The Reporter
subsequently concluded that the site would be "suitable for development from a greenbelt
perspective". 
The recommendations of the Scottish Government in respect of allocating the land as a
Policy P2 housing site were accepted by the Council at a meeting of the Communities,
Housing and Planning Services Board in April 2021. 
A planning application was subsequently submitted by Stewart Milne Homes in March 2022
for a residential development comprising of 59 dwellinghouses and 24 flats. This application
was considered by the Planning and Climate Change Policy Board in November 2022 where
the Board was minded to grant the application subject to conditions and the conclusion of a
Section 75 legal agreement. However, Stewart Milne went into administration before the
legal agreement could be concluded and the consent was never issued. CALA Homes have
subsequently taken control of the site from the appointed administrator. 
CALA Homes have submitted a revised site layout and a package of updated supporting
documentation that has been the subject of appropriate statutory re-notification, re-
advertisement and re-consultation alongside additional courtesy notifications. As outlined
earlier in the report, the Council sought legal advice to determine whether a new round of
statutory pre-application consultation activity (associated with the Proposal of Application
Notice process) would be required but were advised that no additional requirements applied
as the existing application was being progressed. The assessment of the application has
been based on this updated information. 
The housing emergency declared by the Scottish Government in May 2024 is relevant to the
assessment of the application. Letters from the Cabinet Secretary for Housing, Planning
Minister and Chief Planner in June 2024 and September 2025 have reiterated the key role
the planning system has to play in the delivery of new housing that will help address the
emergency. In particular, the Ministers and Chief Planner have emphasised the importance
of the proportionate assessment of applications and reiterated that applications must be
assessed against the Development Plan as a whole. Contradictions between individual
policies are to be expected and must be weighed up by the decision maker.
Assessment
Policy 16 a) of NPF4 provides support for new homes on land allocated for housing in the
LDP. As the land is allocated as a Policy P2 housing site in the LDP the erection of a 75 unit
residential development would comply with both Policy 16 a) of NPF4 and Policy P2 of the
LDP. 
The site is also covered by Policy P1 of the LDP. Policy P1 supports the continuance of built
form, where the development would be compatible with, and complementary to, surrounding

Page 8

uses. Similarly, Policy 14 of NPF4 provided support for proposals that are consistent with the
six qualities of successful places. 
To consider whether the proposal is compatible with surrounding uses and complies with
other relevant policies and guidance such as the Site Development Brief, it is appropriate to
assess the application against the five criteria for creating successful place that are set out in
the New Development Supplementary Guidance. 
Access and Connectivity
Pedestrian and vehicular access into the development would be taken from an existing
roundabout at the eastern end of Florish Road. No concerns have been raised by Roads
Development with regard to the suitability of the access or the roundabout's ability to cope
with increased traffic, subject to a condition ensuring the junction is formed in line with the
requirements of the National Roads Development Guidance. Upgrades completed by CALA
Homes as part of their adjoining development would provide direct connections from the site
to the existing footway network and would help ensure the junction is safe for pedestrians. 
A Construction Traffic Management Plan can be requested via condition to ensure the
delivery of the development would not have an unacceptable impact on the existing road
network. 
All properties would engage positively with the road network within the development,
creating a well defined streetscape that would benefit from passive overlooking. Parking
would be provided in line with the requirements of the National Roads Development
Guidance. 
The permeable layout would allow both vehicles and pedestrians to move easily through the
development, with 2-metre-wide footways found on both sides of the carriageway across the
site. Raised tables and the selective narrowing of the carriageway in specific locations would
help reduce vehicle speeds, contributing to the creation of a pleasant place to live in line with
the requirements of Policy 14 of NPF4. The proposal would also comply with Policy 21 e) of
NPF4 in that the public realm has been designed to enable children and young people to
move around safely and independently. 
Roads Development requested that the option of providing a pedestrian link between the
application site and the existing CALA development to the west be explored. However, this
was considered disproportionate as the link would have sat in close proximity to the
proposed pedestrian access and would not have resulted in a significant reduction in journey
times for those walking between the two developments. 
Roads Development also requested that a pedestrian footpath through Sandieland Woods
be provided to connect the site with Greenock Road to the south. This was also considered
to be disproportionate relative to the benefit such a link would provide, with it considered that
it would be more beneficial to focus connectivity enhancements on the existing adopted road
network to the west of the site. 
The applicant has agreed to provide a formal crossing point in the form of a zebra crossing
on Florish Road, approximately 350 metres to the west of the application site. The crossing
point would link into the existing footway and footpath network in the surrounding area,
providing active travel connections from the development towards local schools and Erskine
Town Centre. Additional offsite upgrades identified by Roads Development, such as the
provision of the dropped kerb crossing across Torran Drive and the resurfacing of the Florish
Road roundabout, can be delivered via condition. Existing residential properties would also
benefit from the provision of a formal crossing point and the other offsite upgrades. The

Page 9

permeable layout and offsite upgrades would help allow the occupants of the development to
benefit from, and contribute to, local living in line with Policy 15 of NPF4. 
Following comments from Roads Development, discussions were held with the applicant
with a view to providing additional subsidy to allow bus route 521A to operate for a longer
period. However, the applicant was not agreeable to providing additional funds, noting that
there is no policy within the Development Plan that requires a financial contribution to be
made for a development of this size. Such a position is accepted and it is therefore not
reasonable for the Planning Authority to pursue the matter further. 
In respect of public transport provision more generally, the development would be within
easy walking distance of existing bus stops on Newshot Drive, with the offsite upgrades
discussed above encouraging the use of existing services. Furthermore, the addition of fifty
seven dwellings and the gentle increase in density provided by the eighteen flats would help
support bus services in the area and would help make services viable in the long term
without the need for time limited subsidies. 
Given the above, the proposal complies with Policy 13 of NPF4 and Policy I1 of the LDP in
that transport requirements have been considered in line with sustainable travel hierarchies.
The site has been designed, and offsite enhancements secured, to improve active travel and
public transport connectivity and reduce reliance on private cars. 
Environment and Community
Policy 1 of NPF4 requires development proposals to give significant weight to the climate
and nature crises. Policy 3 b) of NPF4 states that major developments will only be supported
where it can be demonstrated that the proposal would conserve, restore and enhance
biodiversity. Policy 3 b) goes on to state that proposals should be based on an
understanding of the existing characteristics of the site and its ecological context prior to
development and that potential negative effects should be fully mitigated in line with the
mitigation hierarchy prior to identifying enhancements. 
Policy 3 d) of NPF4 also requires adverse impacts on biodiversity, including cumulative
impacts, to be minimised through careful planning and design. Policy 4 of NPF4 requires
consideration to be given to the impact the proposal would have on designated sites and
protect species while Policy 6 supports the retention and enhancement of tree cover. 
Similarly, Policy ENV2 of the LDP seeks to minimise the impact developments would have
on the natural environment while the associated Supplementary Guidance states that
proposals should not significantly affect existing species or habitats and should be
appropriately designed to improve habitat connectivity. 
The applicant has submitted a suite of documents that examine the current condition of the
site in respect of biodiversity. These have been used to inform the development proposal
and any mitigation and enhancement measures required. 
The Ecological Appraisal submitted as part of the application has been reviewed by the
Council’s external ecologist and, subject to conditions relating to the provision of an
overwintering bird survey and Biodiversity Enhancement and Management Plan, found to be
acceptable. The majority of the site is comprised of habitat that is not uncommon in the
surrounding landscape, such as modified grassland and arable farmland, while higher quality
features such as the tree belts found along the northern and western boundaries and mature
specimens covered by the TPO would be retained. 
The retention of the tree belts is of particular importance given they would allow wildlife to
travel through the site and across the wider landscape. The retention of the majority of tree

Page 10

cover would ensure potential negative impacts on wildlife, and in particular species such as
birds and bats, are avoided in line with the mitigation hierarchy. The proposal would then
enhance conditions for wildlife via the creation of a SUDS basin and native tree and hedge
planting. 
The creation of a SUDS basin that would incorporate planting suited to the location would
introduce standing water into the site, creating a new type of habitat that would be beneficial
for species such as birds and bats that would make use of the retained tree cover.
Integrating the SUDS basing with existing and proposed green infrastructure would comply
with Policies 20 b) and 22 c) of NFP4 and would contribute towards the creation of a
pleasant residential environment in line with Policy 14 of NPF4. 
While no bat roosts were found at the site and only three trees were identified as being
suitable to host roosts, the installation of 170 bat boxes across the development would
increase the likelihood that bats would roost at the site and take advantage of the new and
retained habitats. The installation of 170 bird boxes would perform the same role for birds.
Openings would also be created in the bottom of fences to allow animals such as hedgehogs
to move across the site via the retained tree belts. In addition, no lighting would be installed
around the SUDS basin or play area in line with the recommendations of the Ecological
Appraisal to help to prevent disturbance to bats and other wildlife at night. A condition can be
added to ensure compliance with the aforementioned measures. As such, the proposal
would comply with Policy 4 of NPF4 and Policy ENV2 of the LDP in respect of protected
species. 
In respect of designated sites, Teucheen Wood SINC (Site of Importance for Nature
Conservation) is located approximately 100 metres to the south while the Inner Clyde SSSI
(Site of Special Scientific Interest) and SPA (Special Protection Area) is located 500 metres
to the north. The Black Cart SPA is located approximately 1 kilometre to the south. 
Given the separation distance between the development and each designated site as well as
the fact existing housing and roads are found in between it is not considered that the
proposal would have a negative impact on any designated site. NatureScot have not
objected to the proposal, noting that the development is unlikely to have a significant direct
or indirect effect on the Black Cart or Inner Clyde SPAs. NatureScot have also advised that
an Appropriate Assessment is not required given the development would not negatively
impact on any designated sites. 
An overwintering bird survey was recommended by the Council's external ecologist in order
to understand how the proposal would impact species, such as Whooper Swans and
redshank, that could use the land for overwinter grazing. However, NatureScot's consultation
response takes into account habitat and overwinter grazing provision across all land in the
vicinity of the designated sites and they have not requested any additional surveys. As such,
it is not considered proportionate to request an overwintering bird survey. 
The development would therefore not have an unacceptable impact on nearby designated
sites in line with Policy 4 of NPF4, Policy ENV2 of the LDP and the associated
supplementary guidance. 
The Tree Survey Report and Arboricultural Impact Assessment submitted by the applicant
have also been reviewed and found to be acceptable. 
The outer edge of the trees found along the northern and western site boundaries would be
thinned as the development would infringe upon these specimens. The reduction in tree
cover would be small in relation to overall tree cover found along the boundaries and

Page 11

carrying out the works in a controlled manner is preferable to the trees being damaged
during construction. 
Small pockets of trees would also be removed around the entrance to the site and along the
southern site boundary as they would be incompatible with the layout of the development.
The removal of these trees to facilitate the creation of an acceptable layout is accepted and
would be compensated for as part of the proposed landscaping strategy. 
6 mature specimens would be removed from Sandieland Wood which is covered by a TPO.
Of those to be removed, some are severely damaged, others display signs of ash dieback
while one is dead. No high quality mature specimens would be removed and the majority of
the woodland would not be affected by the development. Several self seeded understory
trees would also be removed to facilitate the formation of the SUDS basin and children's play
area. The specimens that would be removed are unlikely to grow into high quality, mature
specimens due to overcrowding. The wider benefits of creating space for the SUDS basis
and children's play area are discussed elsewhere in the report. 
Overall, the majority of trees at the site would be retained and would be incorporated into the
design of the development. A condition can be added to ensure no additional trees are
removed without the approval of the Planning Authority and to ensure those that would
remain are adequately protected during construction. 
89 trees would be planted across the development to compensate for those that would be
removed and to increase overall tree cover as part of a broader landscaping strategy. The
use of standard and heavy standard specimens would help provide instant impact while the
use of a variety of native broadleaf specimens is welcome from a biodiversity perspective. 
While all planting would be beneficial to biodiversity, the planting along the eastern site
boundary is of particular importance. The rear curtilages of plots 42 and 44 have been set
back from the site boundary by a minimum of 2 metres at the request of the Planning
Authority to create space for tree planting. 11 standard or heavy standard specimens
consisting of native species such as whitebeam, maple and birch would be planted while an
understory would be created using species such as willow and hazel. As no trees are
currently found in this part of the site, the planting would create a corridor that would connect
Sandieland Wood to existing trees on the northern and western site boundaries as well as
provide a link from the woodland to the SSSI and SPA to the north. As this land would be
located outwith the curtilage of the residential properties it would be allowed to establish over
time and would become a key corridor for wildlife within the landscape. 
Overall, the proposal would comply with Policy 6 of NPF4, the New Development
Supplementary Guidance on Trees and the Council's tree policy in that the majority of tree
cover at the site would be retained and enhanced to the benefit of biodiversity. The proposal
is also consistent with the approved Site Development Brief in respect of tree cover. 
The retention of the majority of tree cover across the site and the proposed landscaping
would also contribute to the creation of a pleasant built environment, in line with Policy 14 of
NPF4. In particular, the way planting has been used to break up areas of hardstanding is
welcome. 
Given the site's proximity to Glasgow Airport, a condition can be added requesting the
submission of a Bird Hazard Management Plan. This would allow the airport to ensure the
species planted would not attract significant numbers of birds that could impact their
operations.

Page 12

Overall, the proposal raises no concerns in respect of its impact on wildlife or the natural
environment. The retention of the majority of tree cover across the site combined with
measures such as the formation of a SUDS basin, additional native planting and the
installation of bird and bat boxes would ensure the development would help enhance
biodiversity at the site. As such, the proposal complies with Policy 3 of NPF4 and the
Scottish Government's Planning Guidance on Biodiversity as well as Policy ENV 2 of the
LDP and its associated supplementary guidance. 
Policy 22 of NPF4 as well as Policy I3 of the LDP and its associated supplementary
guidance state that proposals must not increase the risk of flooding to others or be at risk of
flooding themselves. A Flood Risk Assessment and Drainage Strategy Report have been
submitted in support of the application which conclude that the development would not be at
risk of flooding and could be drained in a sustainable manner. The report has been reviewed
by the Council’s external flood and drainage consultant and, in principle, it is accepted that
all aspects of the Council's guidance can be fully complied with. The drainage strategy has
also been designed to cope with the impacts of heavier rainfall brought about by climate
change, in line with the requirements of Policy 2 b) of NPF4. 
As such, it is considered that the proposal complies with Policy 22 of NPF4 as well as Policy
I3 of the LDP and the associated supplementary guidance. A condition can be added to
ensure a full drainage strategy is submitted for approval prior to the commencement of
development and that all drainage measures are in place prior to the occupation of the first
dwelling and maintained thereafter to the satisfaction of the Planning Authority. 
Foul waste would connect to the existing sewer while drinking water would be provided from
the mains supply in line with the requirements of Policy 22 d) of NPF4. Scottish Water have
not objected to the proposal. 
Environmental Protection have requested that conditions are applied in respect of potentially
contaminated land while the Mining Remediation Authority have not objected to the proposal.
As such, the site could be made safe for development in line with the requirements of Policy
9 of NPF4. 
The West of Scotland Archaeological Service has requested that a programme of
archaeological works is carried out prior to the commencement of development to ensure
any historic artefacts buried at the site are recovered and recorded. A condition can be
added to ensure compliance. 
Context and Character
The application site is located on the western edge of Erskine, with the site bound to the
north, south and west by existing residential properties. The proposal would not significantly
extend the settlement boundary beyond its current maximum extent and the proposal would
represent a small addition to the existing settlement. 
The development would not introduce a new use into the area that would disturb the amenity
of neighbouring properties while the density of the development would be in keeping with the
surrounding built environment. The development would not look out of place when viewed
from the existing settlement or from individual neighbouring residential properties given the
site is bound by the existing built environment on three sides. 
No concerns have been raised by Environmental Protection in respect of noise from the
nearby airport or possible air pollution caused by increased traffic on the road network.

Page 13

Although the land immediately to the east of the site is designated as greenbelt, the erection
of a residential development would not impact on the greenbelt designation and the proposal
would not fragment the greenbelt, limit its use or otherwise harm its environmental qualities. 
The development would share a 345 metre long border with the greenbelt which, for privacy
and practical reasons, would be marked with fencing. 1.8 metre high timber fencing would be
used to screen the rear curtilage of properties found along this boundary. However, only 95
metres of the boundary would be comprised of timber fencing and the longest continuous
stretch would measure only 57 metres in length. 
The remaining 250 metres of boundary would be marked with a post and wire fence. The
post and wire fencing would, when combined with landscaping that would be comprised of
native species, soften the appearance of the development when viewed from the land to the
east. A section of 1.8 metre high timber fencing that would have been located between units
20 and 21 has been replaced with post and wire fence at the request of the Planning
Authority to help break up the extent of timber fencing and to allow for views out into the
greenbelt from within the development. 
In addition, the road and parking area that would serve the electricity substation and
wastewater pump station have been finished in grasscrete at the request of the Planning
Authority. Reducing the amount of hardstanding in close proximity to the boundary would
further minimise the visual impact the development and would increase the amount of
permeable surfaces in line with Policy c) 22 of NPF4. 
It is therefore considered that the development would be compatible with the greenbelt
designation and would not have an unacceptable visual impact when viewed from within the
greenbelt. 
Children's Services have no objection to the proposal, subject to the developer paying a
financial contribution for the following schools as they are operating at above 85% capacity.
The contribution has been calculated in line with the Council's Developer Contributions
(Education) Planning Guidance and works out as follows for each school:
▪ Park Mains High School - £285,600
▪ Trinity High School - £128,800 
The applicant has agreed to pay the contribution and an appropriate legal agreement can be
entered into to ensure compliance. As such, the proposal complies with Policy 18 of NPF4
and Policy I8 of the LDP in that the impacts of the development on infrastructure can be
mitigated. 
Overall, the proposal would be in keeping with the character of the surrounding area and
would be consistent with the adopted spatial strategy. 
Buildings and Design
The proposed development would create a varied streetscape, with a variety of detached
and terraced dwellings as well as flats found across the site. The mix of house types and
sizes means the proposal would comply with Policy P3 of the LDP and Policy 16 c) of NPF4
in that it would help widen the choice available to those looking to live in the area. 
18 elderly amenity flats would be erected as part of the development and would be used by
Bridgewater Housing Association to allow older tenants to reside independently with an
element of support. Bridgewater Housing Association have written a statement in support of
the application and this has been lodged as part of the package of the revised planning
submission. Funding for the construction of these flats would be provided through the
Renfrewshire Strategic Housing Investment Plan (SHIP) that was approved by the

Page 14

Communities and Housing Policy Board in August 2025. The proposal is therefore
considered to comply with Policy 16 of NPF4 as well as Policy P3 of the LDP and the
associated supplementary guidance in that up to 25% of the units on the site would be
affordable homes that would help diversify housing stock provision within the area. 
All buildings, including the blocks of flats, would be of a size and design that is acceptable
for the location and would not result in the overdevelopment of the site. The proposal raises
no privacy or overlooking concerns and an acceptable amount of garden ground would be
provided for all dwellings. 
Both the dwellings and blocks of flats would be finished in a combination of white render and
stone while each of the buildings would have a pitched roof finished with grey roof tiles. The
use of a common palette of materials is welcome. 
Both Policy 21 d) of NPF4 and the Council's supplementary guidance on open space
provision require new developments to incorporate good quality, accessible play provision
into their design. Policy 21 f) of NPF4 goes on to state that, as far as possible, new play
provision should:
▪ provide stimulating environments
▪ provide a range of play experiences including opportunities to connect with nature
▪ be inclusive
▪ be suitable for different ages of children and young people
▪ be easily and safely accessible by children and young people independently,
including those with a disability
▪ incorporate trees and/or other forms of greenery
▪ form an integral part of the surrounding neighbourhood
▪ be well overlooked for passive surveillance
▪ be linked directly to other open spaces and play areas 
A play area featuring both formal play equipment such as a slide and agility trail and pockets
of open amenity space would be formed on the edge of Sandieland Wood, in the space
created following the removal of trees discussed earlier in the report. The formal play
equipment would have a natural timber finish that would not look out of place when viewed
against the backdrop of the woodland. Children would also benefit from the opportunity to
play in the portion of woodland that sits within the existing site but a post and wire fence
would prevent access to the wider woodland and farmland beyond. Although the children's
play area would be located in close proximity to the SUDS basin, a post and wire fence
would prevent unauthorised access. The play area and open space would benefit from
passive overlooking from housing to the west but would not raise any amenity issues for
those living in these properties. The chosen location would ensure the woodland forms an
integral part of the development layout while pillars on either side of the footpaths that lead
into the area would create a gateway feature that further contributes to the overall quality of
the layout. 
The construction of the sections of footpath that would connect the play area to the wider
site would involve the installation of a no-dig cellular system on top of the existing land to
avoid ground disturbance. Although the route of the paths has been designed to avoid the
root protection zones of existing mature specimens, the cellular system would further protect
the trees as well as the surrounding landscaping as it grows and matures. These sections of
footpath would be finished with a recycled rubber and natural stone aggregate mix that
would be appropriate for the setting. A condition would ensure the footpath is delivered to the
approved specification. 
The provision of formal play equipment and open amenity space within a woodland setting is
considered to comply with Policy 21 d) and f) of NPF4 and would contribute to the creation of

Page 15

a pleasant and distinctive environment in line with Policy 14 of NPF4. A condition can be
added to ensure the play provision is constructed to the satisfaction of the Planning
Authority. 
The choice of finishing materials for all areas of hardstanding would be acceptable and a
condition can be added to ensure all areas are completed to the satisfaction of the Planning
Authority. 
The applicant's sustainability statement notes that the development would exceed the
requirements of current Building Regulations while technologies such as solar panels, air
source heat pumps and EV charging facilities would be installed across the development. As
such, the proposal would comply with Policies 1, 2 and 11 of NPF4 and Policy I4 of the LPD
in that the proposal makes use of low and zero carbon technologies to reduce emissions. 
Provision for the storage and disposal of waste across all properties is considered
acceptable in line with the requirements of Policy 12 of NPF4 as well as Policy I5 of the LDP
and the relevant supplementary guidance. 
As such, the design of the development and the appearance and impact of the buildings
contained within it are considered acceptable. 
Layout and Form
The form of the proposed development would reflect the surrounding built environment.
Properties would be built around the edge of the site while two small blocks would be located
in the centre, creating a well-connected, permeable layout. The height introduced by the
blocks of flats would help define the entrance to the development when viewed from the
roundabout and existing streetscape. 
Hedging, standalone trees and small pockets of landscaping would be located across the
site. The landscaping would soften the appearance of the development and would assist in
the creation of a pleasant place to live in line with the requirements of Policy 14 of NPF4. 
The extent of boundary treatments visible from the streetscape would be limited while the
sections that would be visible would be constructed using both timber fencing and stone
pillars to improve the overall visual quality. A condition can be added to ensure all fences and
boundary walls to be erected across the development are completed to the satisfaction of
the Planning Authority. 
Retaining walls that would reach a maximum height of 2.45 metres would be located in
several of the plots and would be used to provide level garden ground and an acceptable
level of privacy for all properties. There are no concerns in respect of the height of the walls
and a condition can be added to ensure full details of their design is provided prior to the
commencement of development. 
Overall, the layout and form of the development raise no concerns. 
Representations
All drawings and supporting information submitted by the applicant was considered sufficient
by the Planning Authority and all relevant consultees to allow the application to be assessed
in line with both The Town and Country Planning (Development Management Procedure)
(Scotland) Regulations 2013 and the Development Plan. 
In respect of the claim that the proposal would result in the loss of greenbelt land, the site is
not within the greenbelt. Instead, the land is an allocated housing site within the LDP.

Page 16

The limited environmental impact from the loss of sequestered carbon would be more than
offset by the compensatory planting proposed by the applicant. Furthermore, the majority of
tree cover at the site would be retained. 
In respect of the claim that facilities such as schools, GPs and dentists cannot cope with
additional housing, the site is allocated as a housing site within the LDP. Through the
preparation of the plan relevant consultees and interested parties would have been
consulted and given the opportunity to raise concerns. In addition, a financial contribution
from the developer would mitigate the impact the development would have on the education
estate. 
The cumulative impact of recent residential developments in the area have been assessed
through the LDP, as has how the allocation of the site for housing would interact with
ongoing housebuilding in Dargavel. 
The risk of fire, risk of fly tipping, lack of a police presence in the area and potential impact
on views are not material planning considerations. The potential for damage to occur to
existing properties or for construction to harm the amenity of nearby properties are also not
material planning considerations. 
The affordability or need for the housing is not a material planning consideration. However, it
is noted that the proposal would increase supply in the area and 18 of the units would be
taken on by Bridgewater Housing Association who have provided a bespoke statement as
part of this application and indicated that there is a need for such properties. 
The existing Environmental Impact Assessment (EIA) Screening Opinion issued when the
application was first received is still valid and the proposal would not have a significant effect
on the environment. 
It is not accepted that the erection of a residential development in a residential area on a site
that has been allocated as a housing site in the LDP and is consistent with all relevant
criteria in the adopted Development Plan would breach anyone’s human rights. 
All other issues have been addressed in the above report. 
Planning Obligations
The Council is required to provide a summary of the terms of any planning obligation(s) and
any associated legal agreement(s) and/or mechanism(s) required to secure them including
those provisions under The Town and Country Planning (Scotland) Act in relation to the grant
of permission for the proposed development. 
As detailed above, an appropriate form of legal agreement/mechanism would be required to
secure the following planning obligations:
▪ £285,600 financial contribution towards Park Mains High School
▪ £128,800 financial contribution towards Trinity High School
▪ The provision of 18 flats that would be used as elderly amenity accommodation by
Bridgewater Housing Association 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions and an appropriate form of
legal agreement to secure the planning obligations discussed above. 
Recommendation

Page 17

Grant Subject to Conditions and the provision of a form of Legal Agreement/mechanism to
secure planning obligations. 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there
were no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)       
1. That the development hereby permitted must be begun within three years of the
date of this permission.   
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act
2019. 
2. No development shall commence on site until written approval of: 
a) a Site Investigation report (characterising the nature and extent of any soil,
water and gas contamination within the site); and, if remedial works are
recommended therein 
b) a Remediation Strategy and Implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained with the site
investigation report prepared in accordance with current authoritative technical
guidance, has been provided by the Planning Authority. 
Reason: To ensure that the site will be made suitable for its proposed use. 
3. Prior to the occupation of any unit within an identified phase of development, the
developer shall submit for the written approval of the Planning Authority: 
a) a Verification Report confirming completion of the works specified within the
approved Remediation Strategy for that phase of development; or 
b) if remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported soils are suitable for use on the site shall
be submitted to the Planning Authority and approved in writing     
Reason: To demonstrate that the works necessary to make the site suitable for
use have been completed. 
4. Prior to the commencement of development, a Construction Traffic Management
Plan shall be submitted to, and approved in writing by, the Planning Authority.
The approved Construction Traffic Management Plan shall be implemented prior
to development commencing and remain in place until the development is
complete.   
Reason: In the interests of road safety. 
5. The vehicular and pedestrian access into the development shall be constructed
in line with the requirements of the National Roads Development Guidance.   
Reason: In the interests of road safety.

Page 18

6. Prior to the commencement of development, full details of the following offsite
upgrades that are identified in the Florish Road Walkover report (October 2025)
shall be submitted to, and approved by, the Planning Authority:
▪ Provision of a dropped kerb crossing across Torran Drive
▪ Resurfacing of the Florish Road roundabout
▪ Provision of a zebra crossing to the west of Wrightlands Cresent
▪ Installation of a dropped kerb on the footway between 17 and 18
Sandielands Avenue   
Thereafter, all offsite upgrades shall be completed prior to the occupation of the
final dwelling to the satisfaction of the Planning Authority, unless otherwise
agreed in writing.   
Reason: To improve pedestrian connectivity. 
7. No development shall take place until the developer has secured the
implementation of a programme of archaeological works in accordance with a
written scheme of investigation which has been submitted by the applicant,
agreed by the West of Scotland Archaeology Service, and approved by the
Planning Authority. 
Thereafter, the developer shall ensure that the programme of archaeological
works is fully implemented and that all recording and recovery of archaeological
resources within the development site is undertaken to the satisfaction of the
Planning Authority in agreement with the West of Scotland Archaeology Service.   
Reason: To ensure appropriate consideration of any archaeology given the
possibility of such interest within the site. 
8. Prior to the commencement of development, the applicant shall submit for the
written approval of the Planning Authority:
a) a timetable for the implementation of all soft landscaping and the footpaths
through the area of open space shown on approved drawings "Landscape
Proposal - Sheets 1-6 (June 2025)" 
b) a timetable for the implementation of the formal play equipment shown on
the approved drawing "Play Area Design (June 2025)"
c) a strategy for the future management and maintenance of all landscaped
areas, footpaths and the play equipment, including provision for replacement
planting if individual plants were to become diseased, die, become seriously
damaged or are removed within 5 years of being planted   
All landscaping, footpaths and the formal play equipment shall thereafter be
implemented in line with the aforementioned drawings and the agreed timetable,
unless otherwise agreed in writing with the Planning Authority. The landscaping,
footpaths and the formal play equipment shall also be maintained in line with the
approved management statement for the lifetime of the development, unless
otherwise agreed in writing with the Planning Authority.   
Reason: To ensure a robust landscaping strategy is implemented in the interests
of visual amenity. 
9. Tree removal shall only occur in line with approved drawing 182348-GIS002
(Tree Protection Plan) and no additional trees shall be removed unless agreed in
writing in advance with the Planning Authority.

Page 19

All existing trees to be retained as part of the development shall be protected in
line with the recommendations of the approved October 2025 Arboricultural
Impact Assessment. 
For the avoidance of doubt, any retained trees which, within a period of five
years from the completion of the development die, or become seriously damaged
or diseased shall be replaced in the next planting season with others of a similar
size and species, unless Renfrewshire Council as Planning Authority gives
written consent to any variation.   
Reason:  In the interests of visual amenity and nature conservation. 
10. Prior to the commencement of development, the developer shall submit for the
written approval of the Planning Authority, a Biodiversity Enhancement and
Management Plan that sets out how the development would enhance
biodiversity at the site in the long term. The plan shall set out timescales for the
implementation of all measures identified in the report. 
Thereafter, all measures identified in the report shall be implemented to the
satisfaction of Renfrewshire Council as Planning Authority in accordance with the
agreed timescales, unless otherwise agreed in writing.   
Reason: To ensure appropriate provision is made for the long term enhancement
of nature at the site.   
11. Prior to the occupation of the final dwelling, all biodiversity measures shown on
drawing 0321-PL-005C (Biodiversity Layout) shall be implemented to the
satisfaction of Renfrewshire Council as Planning Authority, unless otherwise
agreed in writing.   
Reason: To ensure appropriate provision is made for the long term enhancement
of nature at the site. 
12. Prior to the commencement of development, details of the design and finish of all
retaining walls to be erected across the development shall be submitted to, and
approved by, the Planning Authority. Thereafter, all retaining walls shall be
constructed in line with the approved details to the satisfaction of Renfrewshire
Council as Planning Authority, unless otherwise agreed in writing.   
Reason:  In the interests of visual and residential amenity 
13. Prior to occupation of any particular dwellinghouse or flat, any fence or wall to be
erected in association with that plot shall be erected in accordance with
approved drawing 0321-PL-003G, unless otherwise agreed in writing by
Renfrewshire Council as Planning Authority.       
Reason:  In the interests of visual and residential amenity. 
14. Prior to occupation of the final dwelling, all fencing, walls and pillars to be
erected in communal areas shall be erected in accordance with approved
drawing 0321-PL-003G, unless otherwise agreed in writing by Renfrewshire
Council as Planning Authority.       
Reason:  In the interests of visual and residential amenity.

Page 20

15. Prior to the commencement of development, a Drainage Strategy shall be
submitted to, and approved by, Renfrewshire Council as Planning Authority. The
Drainage Strategy shall accord with the 'Council's Drainage Assessment - Notes
for Guidance'. Thereafter, the approved Strategy shall be implemented in full
prior to the completion of the development and maintained thereafter to the
satisfaction of Renfrewshire Council as Planning Authority.     
Reason: To ensure adequate provision for drainage associated with the
development. 
16. The development shall be implemented in line with the approved Flood Risk
Assessment (August 2025). 
Reason: To ensure the site is not at risk of flooding. 
17. Development shall not commence until a Bird Hazard Management Plan has
been submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The submitted plan shall include details of: 
a) monitoring of any standing water within the site temporary or permanent 
b) earthworks, soil stripping or excavation works 
c) sustainable urban drainage schemes (SUDS) 
d) maintenance of planted and landscaped areas 
The Bird Hazard Management Plan shall be implemented as approved, on
completion of the development and shall remain in force for the life of the
development. No subsequent alterations to the plan are to take place unless first
submitted to and approved in writing by the Planning Authority in consultation
with Glasgow Airport.  
Reason: It is necessary to manage the development in order to minimise its
attractiveness to birds which could endanger the safe movement of aircraft and
the operation of Glasgow Airport. 
18. No development shall take place until full details of soft and water landscaping
works have been submitted to and approved in writing by the Planning Authority,
details must comply with Advice Note 3 ‘Potential Bird Hazards from Amenity
Landscaping & Building Design’ (available at
www.aoa.org.uk/publications/safeguarding.asp). These details shall include:  
a) The species, number and spacing of trees and shrubs 
b) Drainage details including SUDS – Such schemes must comply with Advice
Note 6 ‘Potential Bird Hazards from Sustainable urban Drainage Schemes
(SUDS) (available at www.aoa.org.uk/publications/safeguarding.asp ). 
No subsequent alterations to the approved landscaping scheme are to take
place unless submitted to and approved in writing by the Planning Authority in
consultation with Glasgow Airport. The scheme shall be implemented as
approved. 
Reason: To avoid endangering the safe movement of aircraft and the operation
of Glasgow Airport through the attraction of birds and an increase in the bird
hazard risk of the application site. 
Advisory Note(s) 
1. The proposed development lies within a coal mining area which may contain
unrecorded coal mining related hazards.  If any coal mining feature is

Page 21

encountered during development, this should be reported immediately to the
Mining Remediation Authority on 0345 762 6846 or if a hazard is encountered on
site call the emergency line 0800 288 4242. 
2. Given the nature of the proposed development it is possible that a crane may be
required during its construction. We would, therefore, draw the applicant's
attention to the requirement within the British Standard Code of Practice for the
safe use of Cranes, for crane operators to consult the aerodrome before erecting
a crane in close proximity to an aerodrome. This is explained further in Advice
Note 4, 'Cranes and Other Construction Issues' (available at
http://www.aoa.org.uk/policy-safeguarding.htm 
For further information please contact James McCafferty, Development Standards Team,
Email: james.mccafferty@renfrewshire.gov.uk