PUBLIC
Planning and Climate Change Policy Board: 4 November 2025 
Report by Chief Planning Officer 
Reference No 25/0510/PP
Application Type Planning Permission (Major)
Proposal Erection of new-build 3 storey Teaching Annex Building and 2
storey P.E. Annex Building, single-storey Dining Extension to
existing School building courtyard. Associated landscape works
including canopy over amphitheatre steps, canopy to external
courtyard dining area and seating. Alteration and extension of bus
parking area and car parking. New electrical substation with GRP
enclosure adjacent to existing Energy Centre.
Location Renfrewshire Council, Main Building, Park Mains High School
Ward 12 - Erskine and Inchinnan
Community Council Erskine Community Council
Applicant Children's Services, Renfrewshire Council
Recommendation Grant Subject to Conditions
All plans, reports, documents and representations relating to this application can be
viewed in full online at https://pl-bs.renfrewshire.gov.uk/online-
applications/applicationDetails.do?activeTab=summary&keyVal=SYNQ9TMWJBZ00 
This report fulfils the requirements of regulation 16, Schedule 2, paragraphs 3(c) and 4 of The
Town and Country Planning (Development Management Procedure) (Scotland) Regulations
2013. 
The report is presented to the Planning and Climate Change Policy Board in line with the
Council's Scheme of Delegation.  In this instance, the application relates to a major
development as defined within the Town and Country Planning (Hierarchy of Development)
(Scotland) Regulations 2009. 
Proposal
This application seeks planning permission for the erection of a 3-storey teaching annex
building, 2 storey physical education (PE) annex building and a single storey dining extension
at Park Mains High School, Erskine. The proposal would also include other associated works
including landscaping, a canopy over the amphitheatre steps and external courtyard dining
area. The existing bus parking and car parking area would also be altered and extended and
a new electrical substation with a Glass Reinforced Plastic (GRP) enclosure would also be
installed adjacent to an existing Energy Centre. 
Both annexes and the single storey extensions would be located to the rear of the school. The
3 storey annex building would have a rectangular footprint and would measure approximately
21m x 45m x 14.3m and would comprise of a flat roof enclosed by a 1.1m high parapet. The
teaching annex would include flexible teaching spaces, breakout areas and circulation zones. 
The proposed PE annex would also have a flat roof and would measure approximately 33m x
38m x 10.5m. The PE annex would include two multi-use sports halls, changing villages with
office space. 
The proposed dining extension would increase the school's dining capacity and would
comprise of a flat roof single storey in-fill extension with a floor area of approximately 208sqm.
The dining extension would be located within the existing school courtyard, adjacent to the
internal 'street'. A sheltered dining space would also be located adjacent to the existing PE
block.

Page 2

PUBLIC
Finishing materials for the teaching and PE annexes would be a mixed palette of grey and
bronze metal cladding to the upper levels with facing brick to the ground floor elevations. The
dining extension would be finished with facing brick to match the existing building. 
Vehicular access and drop off would remain as present with direct access via Rashieholm
Roundabout. Within the school grounds, the entrance road from the roundabout would be
widened and a new pedestrian footway formed on the eastern side of the access road to
connect the external footpath network to the school's internal path network. An additional staff
carpark would be formed adjacent to the existing carpark to provide 77 parking spaces
including provision of shelters for 80 cycles. Alterations to the bus-drop off area would also
provide space for 16 x 12-15m buses, 1 x 12m bus and 1 space for a minibus. 
Other associated works include landscaping, formation of sensory garden, allotments, habitat
area and formation of canopies within the grounds. 
Site Description
The application site relates to Park Mains High School, which is located to the south-west of
Rashieholm Roundabout, Erskine. The school is a flat roofed building comprising of a central
atrium with three wings to the rear of the building. 
The current pupil capacity of Park Mains High School is currently 1,717 pupils taking account
of temporary modular classrooms. The proposed extensions would result in a maximum
capacity of 2,000 pupils. 
Pre-Application Consultation with Officers
The Scottish Government strongly encourages constructive pre-application discussions
between prospective applicants and the planning authority.  Pre-application discussions seek
to identify key planning considerations at an early stage and help inform what supporting
information is required to support a subsequent application.   
Pre-application discussions have taken place, focusing on the following matters:
 Principle of development.
 Documents that would be necessary in the submission of the planning application.
 Required consultations. 
Negotiated Improvements
No changes have been negotiated. 
Site History 
The planning history for the site is as follows; if no history is listed then planning has no
record of previous applications for the site. 
Application No: 24/0690/PAN 
Description: Erection of extension to school
Decision: Accepted; 
Application No: 05/0009/RD 
Description: Construction of synthetic surfaced football pitch with associated fencing
and floodlighting.
Decision: Deemed Consent: 
Consultations   
 Dougall Baillie Associates (DBA) (Councils Independent Drainage Consultants) – Request
that further information is provided with regards to attenuation. This information can be
secured through the imposition of an appropriate condition.

Page 3

PUBLIC 
 Glasgow Airport Safeguarding – No objections subject to conditions. 
 Environment, Health and Infrastructure (Environmental Protection) – No objections subject
to conditions. 
 Scottish Water – No objections. 
 Chief Executive's (Roads Development) – Advise of no objection subject to conditions with
regards to further details being submitted with respect to sustainable transport modes. 
 Sports Scotland – No objections. 
 Bishopton Community Council – Object. The size of the extension is inadequate with
regards to the potential pupil intake from Bishopton and Dargavel. The capacity of Park
Mains is capped at 2,000 pupils which includes the proposed extension. This is inadequate
given the potential intake from Dargavel. The financial and environmental cost is also
incalculable due to busing 1,800 pupils to and from Erskine.  The process is also flawed
as the Council made a decision on the Park Main extensions before the latest census was
released and before the latest forecast of pupil numbers. 
Representations
The application has been publicised in line with the requirements of the relevant legislation. 
228 representations have been received with 226 objections, one neutral and one in support. 
The following concerns have been raised through objection: 
 Extensions not big enough to accommodate pupils in catchment area, a new school is
required in Dargavel/Bishopton and development does not take account of roll projections;
 Impact on traffic congestion and increase in vehicular movements is not sustainable;
 Road safety;
 No direct transport links;
 Children lacking teaching attention in a 'super sized' school including degradation and
access to extra curriculum activities;
 Carbon emissions from extra buses, negative impact on environment;
 Walking to school should be encouraged;
 Development doesn't meet education provision for Renfrewshire;
 Financial outlay for taxpayers;
 Undermining of Council's climate commitments;
 Lack of statutory consultation with the public and also teachers;
 Site not suitable for school expansion;
 Bridgewater Shopping Centre being 'swamped' at lunchtime with pupils. 
No comments were made in the supporting representation whilst the neutral representee only
commented that a new school is required.
Policy Context   
In making any determination under the Planning Acts, regard is to be had to the development
plan unless material considerations indicate otherwise. In this instance the Development Plan
consists of National Planning Framework 4 (NPF4) and the Renfrewshire Local Development
Plan (2021) (LDP). 
The following provisions of the Development Plan are considered relevant to the determination
of this application:

Page 4

PUBLIC 
National Planning Framework 4  
 Policy 3 - Biodiversity
 Policy 13 - Sustainable transport
 Policy 14 - Design, quality and place
 Policy 21 - Play, recreation and sport
 Policy 22 - Flood risk and water management 
Full details relating to the policies of the NPF4 can be found online. 
Renfrewshire Local Development Plan
 Policy P1 - Renfrewshire's Places
 Policy P6 - Open Space
 Policy ENV2 - Natural Heritage
 Policy I1 - Connecting Places
 Policy I3 - Flooding and Drainage 
Full details relating to the policies of the LDP can be found online. 
New Development Supplementary Guidance
 Delivering the Places Strategy - Creating Places - Open Space 
Submitted Reports and Assessments
The following reports and assessments were submitted in support of the application: 
 Design and Access Statement - Provides details of the site location, description, wider site
appraisal, design approach, access and movement, landscaping. 
 Pre-application consultation (PAC) Report - Provides details on PAC process including
scope of event, publicity, attendance, feedback etc. 
 Noise Impact Assessment and Noise Survey - Provides details on the method and results
of noise surveys carried out and an assessment of noise to the neighbouring dwellings. 
 Travel Strategy - Provides details of consideration given to travel connections that would
serve the extended school. 
 Transportation Assessment and associated Technical Addendum - Provides details on the
increased traffic associated with the proposed development and active travel review. 
 Drainage Strategy Report and Flood Risk Assessment - Provides details on existing and
proposed drainage including treatment and attenuation and maintenance of the surface
water drainage system. 
 Ground Investigation Report - Provides details on the review of existing ground
investigations. 
 Civil and Structural Works Report - Provides details on ground investigations and
outcomes, including drainage. 
 Environmental Screening Checklist - A request for a screening opinion determined that
though the proposal would fall within Schedule 2 of the Town and Country Planning
(Environmental Impact assessment) (Scotland) Regulations 2017, it is not likely that the
proposed works would have a significant environmental impact which would require an
Environmental Impact Assessment to be undertaken.

Page 5

PUBLIC 
Scottish Ministers Direction
In determining a planning application, the Council is required to provide details of any Direction
made by Scottish Ministers under Regulation 30 (Directions requiring consultation),
Regulation 31 (Directions requiring information), Regulation 32 (Directions restricting the grant
of planning permission) and Regulation 33 (Directions requiring consideration of condition) of
The Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013, or under Regulation 50 (that development is EIA development) of The Town
and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017. 
None. 
Planning Assessment
National Planning Framework 4 (NPF4) provides the long-term national spatial strategy for
planning in Scotland. It sets out the Scottish Government's current view on delivering
sustainable, liveable, and productive places through the application of spatial principles.   
The application relates to the extension of an existing school within school grounds and the
development does not introduce a new land use. As such, the principle of the school in this
location has already been established and it is not under assessment within this application
and consideration concerns only the acceptability of the proposed extension and other
associated works within the school grounds. 
The application site is covered by policy P1 (Renfrewshire's Places) of the LDP which states
that within these areas, there will be a general presumption in favour of a continuance of the
built form. New development proposals within these areas should make a positive contribution
to the place and be compatible and complimentary to existing uses and character. 
Similarly, policy 14 (Design, Quality and Place) also seeks to ensure that proposals will be
designed to improve the quality of an area whether in urban or rural locations and requires
development proposals to be designed to improve the quality of an area and be consistent
with the six qualities and placemaking policy framework set out in the New Development
Supplementary Guidance which set out a range of considerations that form the basis of good
places design. Each consideration will be assessed in turn. 
Context and Character
As detailed above, the application site relates to an existing school with extensive grounds.
The proposed extensions would be located to the rear of the existing school, and it is
considered that the development could easily be accommodated within the school grounds
whilst maintaining open space and recreational areas within the site. It is also considered that
formation of the canopy area and sensory garden  would also enhance the outdoor space
associated with the school. As such, it is considered that the proposed development would be
compatible to the context and character of the site. Adequate services are also in place to
serve the proposals. 
Access and Connectivity
Policy 15 (Local Living and 20 minute Neighbourhoods) advocates local living to encourage
connected and compact neighbourhoods where people can meet most daily needs within a
reasonable distance of their home. Policies 13 (Sustainable Transport) and I1 (Connecting
Places) advocate good accessibility and connectivity to walking, cycling and public transport. 
As discussed above, the principle of the school in this location or the pupil catchment area is
not under assessment within this application and consideration concerns only the acceptability
of the proposed extension. Due to residential development within Bishopton and Erskine, the

Page 6

PUBLIC
pupil capacity requirement for the catchment has increased at the High School and as such,
the extension is required to facilitate this. 
The Transport Assessment submitted with the application states that travel by school bus is
the highest mode of transport with walking, the second most popular. Given the distance to
the existing school from Dargavel and the provision of the school bus, it is considered that
walking is unlikely from this area. However, the catchment area for the school is not a planning
matter and is not something that can be taken into consideration in the assessment of this
application. 
Alterations to the bus-drop off area are proposed to facilitate the increase in school bus
transport. The Travel Strategy submitted with the application also gives consideration to
various interlinking travel connections that will serve the extended school including
aspirational shared use footway links. Details are also provided of public transport services in
the area and the school transport provision. Cycle shelters would also be provided on-site with
provision for 80 spaces. 
The Council's Chief Executive's (Roads Development) also advise of no objection subject to
conditions with regards to further details being submitted with respect to sustainable transport
modes. 
Children’s Services also advise that Transport has been a key consideration as part of the
development and the Council will continue to investigate all avenues to ensure that transport
is as sustainable as possible. Transport requirements are expected to gradually increase over
the 5 plus years and an appraisal will be undertaken to determine which avenue offers the
Council best financial and sustainable value. 
In view of the above, it is considered that the proposal has given due consideration to access
and connectivity in line with policies 13, 15 and I1. 
Layout and Built Form
It is considered that the design of the proposed extensions would be complimentary to the
vernacular of the existing school and the new annexes would have a palette of external
finishes to give them their own identity from the existing school whilst the extended dining area
would be finished in materials to match the existing building. 
It is considered that the proposal would also improve the appearance and use of the external
courtyards with the canopy over the amphitheatre steps, sensory garden etc. As such, it is
considered that the proposal would comply with Policy 14. 
Environment and Community
In response to Policies 22 (Flood Risk and Water Management) and 13 (Flooding and
Drainage), a Drainage Strategy and Flood Risk Assessment were reviewed by the Council's
Drainage Consultant who advise that further information is provided with regards to
attenuation. These details could be secured through the imposition of an appropriate condition. 
With regards to the Noise Impact Assessment (NIA), mitigation is recommended. The
Council's Environment, Housing and Infrastructure (Environmental Protection) were consulted
and advised of no objections subject to conditions. However, it is considered appropriate to
attach an informative for the applicant to seek advice from Environment, Housing &
Infrastructure in this regard. 
Policies P6 (Open Space) and 21 (Play Recreation and Sport)  are similar in that they seek to
protect areas of recreational and functional open space and development proposals which
result in the loss of outdoor sports facilities will only be supported where it can be

Page 7

PUBLIC
demonstrated that there is clear excess of provision to meet current and anticipated demand
in the area, and that the site would be developed without detriment to the overall quality of
provision.   
The school grounds includes 2 full size synthetic grass pitches, an athletics oval and a full size
grass pitch. The proposed works would result in the loss of the grass pitch. Sport Scotland
were consulted and advise of no objections. The applicant advises that consultation has been
undertaken with the school, local community and sports groups who use the 3G pitches and
no concerns have been raised about the loss of the grass pitch. On this basis, Sport Scotland
consider that the proposal would accord with criterion iv) of policy 21 and the site can be
developed without detriment to the overall capacity of provision in the area. It is therefore
considered that the proposal would accord with Policies P6 and 21. 
Policy ENV 2 (Natural Heritage) states that development proposals should consider the
potential impact on natural heritage. A Preliminary Ecological Appraisal was submitted with
the application where habitats within the site were considered to be of relatively low ecological
importance and no specific constraints in this regard were identified in terms of the habitats
likely to fall within the footprint of the development. Bat roost emergence surveys were
recommended for the main school building that will be affected by the development. This could
addressed by the imposition of an appropriate condition in this regard. 
Policy 3 (Biodiversity) also seeks to enhance biodiversity. Proposed landscaping areas
including a sensory garden, allotments, wildflower meadow and tree planting would take place
within the site to enhance the external amenity space around the school. 
Buildings and Design
As discussed above, it is considered that the design, scale and finish of the buildings are
sympathetic to the character and appearance of the surrounding area and in an appropriate
location in accordance with Policy 14 (Design, Quality and Place). 
The design and materials of the building also been chosen to deliver thermal comfort and
overall energy performance in line with Policies 1 (Tackling the Climate and Nature Crisis) and
I7 (Zero and Low Carbon Buildings). 
Representations
The majority of the matters raised in the letters of representation have been addressed in the
foregoing assessment however a summary of the points raised is also set out below with a
response below each highlighted in bold: 
 Extensions not big enough to accommodate pupils in catchment area, a new school is
required in Dargavel/Bishopton; and development does not take account of roll projections; 
The issue of roll projections is fundamentally for Children's Services to consider and
is not a planning matter. Notwithstanding this, Children's Services advise that
projections are based on specialist modelling used across the UK. The methodology
factors in a wide range of data, including population data, school census information
and known future house-building, as well as school intake and transition rates. It is also
advised that the latest detailed long-term projections, produced in partnership with
industry experts show the extended Park Mains High School will have enough capacity
for pupils expected from within the catchment over the years ahead. 
In 2023, the Council agreed to extend Park Mains to 2,000 by considering the pupil
projection forecasts as well as undertaking an assessment on the viability of both
extending Park Mains, or constructing a new secondary school. This assessment found
that the option of constructing a new school could not be justified due to the significant

Page 8

PUBLIC
additional yearly cost to the Council, when comparing both options. Park Mains is the
Council’s newest secondary school, and a decision to build an additional secondary
school for Dargavel/Bishopton would have resulted in Park Mains being significantly
under capacity. The Council’s latest pupil projection forecast, published in late October
2025 continues to show that an extended Park Mains can accommodate all catchment
demand for the years ahead. 
 Impact on traffic congestion and increase in vehicular movements is not sustainable; Road
safety; 
The Council’s Chief Executive’s (Roads Development) have no objections to the proposal.
This issue has also been addressed above. 
 No direct transport links; 
The development relates to the extension of an existing school and as such the
principle of pupils accessing the school through various transport modes has already
been accepted. As discussed above, the Transport Assessment submitted with the
application states that travel by school bus is the highest mode of transport with
walking, the second most popular. Given the distance to the existing school from
Dargavel and the provision of the school bus, it is considered that walking is unlikely
from this area. However, the catchment area for the school is not a planning matter and
is not something that can be taken into consideration in the assessment of this
application. 
Alterations to the bus-drop off area are proposed to facilitate the increase in school bus
transport. The Travel Strategy submitted with the application also gives consideration
to various interlinking travel connections that will serve the extended school including
aspirational shared use footway links. Details are also provided of public transport
services in the area and the school transport provision. Cycle shelters would also be
provided on-site with provision for 80 spaces. 
 Children lacking teaching attention in a 'super sized' school including degradation and
access to extra curriculum activities; 
This is a matter for Children's Services and is not a planning consideration.
Notwithstanding this, Children's Services advise that the proposed development which
includes new PE and teaching facilities would increase subject choice, and a greater
range of ways to support pupils with attainment and wellbeing. Children’s Services also
advise that there will be no change to current class sizes and Park Mains will remain
within the agreed national policy of class size maximums. As a result of increased pupil
numbers, the extension will provide additional teaching spaces and the recruitment of
additional staff. Pupils will not be taught in classes of larger numbers, therefore
retaining current pupil to teacher ratios in line with all secondary schools in the
authority. An increase in capacity through an extended Park Mains High School will
also come with increased pastoral and management staff across the school, ensuring
that young people and families are fully supported in their education journey. 
 Carbon emissions from extra buses, negative impact on environment; Walking to school
should be encouraged; 
As discussed above, the principle of pupils accessing the school through various
transport modes including school buses has already been accepted through the
development of the existing school and the proposed extensions are required to
facilitate the pupil capacity within the catchment area.

Page 9

PUBLIC 
 Development does not meet education provision for Renfrewshire; 
This is a matter for Children's Services and is not a material planning consideration. 
 Financial outlay for taxpayers; 
This is not a material planning consideration. Notwithstanding this Children's Services
advise that the financial case for extending Park Mains High School was publicly set
out in 2023. That analysis showed a new secondary school in Bishopton could cost
£90m to build, meaning net additional annual costs of £5.5m every year. This would not
have been best value for public funds. 
 Undermining of Council's climate commitments; 
As detailed above, the principle of pupils accessing the school through various
transport modes including school buses has already been accepted through the
development of the existing school. 
 Lack of statutory consultation with the public and also teachers; 
The application has been publicised in line with the statutory requirements of the
relevant planning legislation. Other consultation beyond that required as part of this
planning application process is a matter for Children Services. Notwithstanding this,
Children's Services advise that, for the past two years the proposal has been moving
forward, with the support of parent groups from throughout the catchment, who, along
with staff and pupils, have been fully engaged in the redesign. 
 Site not suitable for school expansion; 
For the reasons set out in this report, it is considered that the proposed development
would be of an appropriate scale and could easily be accommodated within the
curtilage of the site without detriment to amenity. 
 Bridgewater Shopping Centre being 'swamped' at lunchtime with pupils. 
This issue of pupils use and activity of and in surrounding facilities is not a planning
matter. 
With regards to the specific concerns raised by Bishopton Community Council with regards to
roll projections and financial outlay, these issues have been addressed above. 
Planning Obligations 
The Council is required to provide a summary of the terms of any planning obligation and any
associated legal agreement and/or mechanism required to secure it including those provisions
under The Town and Country Planning (Scotland) Act in relation to the grant of permission for
the proposed development: 
None required. 
Conclusion
In view of the above, it is considered that the proposal would accord with the relevant
provisions of the Development Plan. There are no other material considerations. Planning
permission should therefore be granted subject to conditions.

Page 10

PUBLIC 
Recommendation
Grant Subject to Conditions 
Reason(s) for Recommendation 
1. The proposal accords with the provisions of the Development Plan and there were
no material considerations which outweighed the presumption in favour of
development according with the Development Plan. 
Condition(s)         
1. That the development hereby permitted must be begun within three years of the
date of this permission.   
Reason: To be in compliance with Section 58 of The Town and Country Planning
(Scotland) Act 1997 as amended by Section 32 of The Planning (Scotland) Act
2019. 
2. Prior to the commencement of any construction works on site the developer shall
provide for the written approval of the Planning Authority:       
a) a Site Investigation Report (characterising the nature and extent of any soil,
water and gas contamination within the site); and, if remedial works are
recommended therein.   
b) a Remediation Strategy and implementation Plan identifying the proposed
methods for implementing all remedial recommendations contained within the Site
Investigation report and including (where relevant) a materials management plan,
a monitoring and maintenance plan and a phasing plan showing how the site is to
be subdivided for the purposes of remedial implementation and/or verification
reporting, prepared with current authoritative guidance has been submitted to and
approved in writing by the Planning Authority.   
Reason: To ensure that the site will be made suitable for its proposed use. 
3. Prior to the occupation of the annexes and extension:   
a)  a Verification Report confirming completion of the works specified within the
approved Remediation Strategy and Implementation Plan; and/or   
b) where remediation works are not required but soils are to be imported to site, a
Verification Report confirming imported materials are suitable for use shall be
submitted to and approved in writing by Renfrewshire Council as Planning
Authority.       
Reason: To demonstrate that the works necessary to make the site suitable for
use have been completed. 
4. That the approved Bird Hazard Management Plan, Park Mains High School,
Erskine, 29 August 2025, shall be implemented and adhered to at construction
and operational phase and there shall be no changes to the approved plan unless
otherwise agreed in writing by Renfrewshire Council as Planning Authority in
consultation with Glasgow Airport.   
Reason: In the interests of Aerodrome Safeguarding.

Page 11

PUBLIC 
5. That the landscaping as detailed in 'Planting Strategy - 23020-OOB-ZZ-00-DR-L-
000040 Rev 03' shall be implemented and maintained in accordance with the
'Landscape Management Plan - 23030-OOB-XX-XX-RP-L006100 P02' to the
satisfaction or Renfrewshire Council as Planning Authority.   
Reason: To ensure a suitable landscape strategy is developed for the site in the
interests of visual amenity and biodiversity. 
6. That the recommendations detailed in 'Preliminary Ecological Appraisal and
Preliminary Roost Assessment dated March 2024' shall be implemented to the
satisfaction of the Council as Planning Authority. For the avoidance of doubt, this
shall include details and findings of any Bat Roost Surveys including any
necessary mitigation undertaken and during the course of the development,
details demonstrating the implementation of the recommendations and mitigation
measures carried out shall be submitted for the written approval of Renfrewshire
Council as Planning Authority.     
Reason: To protect the natural environment. 
8. That, prior to the commencement of development, a detailed schedule of the
proposed external finishes for the annexes and extension, together with a plan
and schedule of the surface treatments to be used on the roads and footpaths
within the site shall be submitted for the written approval of Renfrewshire Council
as Planning Authority. Thereafter, the annexes, extension, roads and footpaths
shall be constructed only in accordance with such details as may be approved to
the satisfaction of Renfrewshire Council as Planning Authority.     
Reason: In the interest of the amenity of the area. 
9. That prior to the commencement of the development hereby approved, a Drainage
Impact Assessment shall be submitted and approved by Renfrewshire Council as
Planning Authority. The Drainage Impact Assessment shall accord with the
'Council's Drainage Assessment - Notes for Guidance'. Thereafter, the
Assessment as approved shall be implemented prior to the completion of the
development and maintained thereafter to the satisfaction of Renfrewshire Council
as Planning Authority.     
Reason: To ensure adequate provision for drainage associated with the
development. 
10. That prior to the commencement of development and the approved Transport
Assessment, a Supplementary Report, detailing the Dargavel construction
timetable, shall be submitted and approved in writing by Renfrewshire Council as
Planning Authority. Any approved mitigation measures identified in the
Supplementary Report shall be submitted for the consideration of Renfrewshire
Council as Planning Authority. Thereafter, any identified mitigation measures shall
be implemented unless otherwise agreed in writing by Renfrewshire Council as
Planning Authority. 
Reason: To ensure that the Transport Assessment reflects the revised Dargavel
construction timetable. 
11. That prior to the occupation of the annexes and extension hereby approved, a
Travel Plan to encourage sustainable modes of transport to the school shall be
submitted to and approved in writing by Renfrewshire Council as Planning

Page 12

PUBLIC
Authority. The Travel Plan shall include a system of management, monitoring,
review and reporting, in respect of the sustainable modes of transport identified.
The measures identified in the plan together with any measures identified for
implementation shall thereafter be submitted for the consideration of Renfrewshire
Council as Planning Authority. Thereafter, any agreed measures shall be
implemented unless otherwise agreed in writing by Renfrewshire Council as
Planning Authority. 
Reason:  To ensure that a cohesive approach is taken to sustainable travel. 
Advisory Note(s)  
1. The applicant is advised to seek advice from the Council's Environment, Housing
& Infrastructure with regards to noise mitigation for operational plant (Air Source
Heat Pumps, Kitchen Extract and Air Handling Plant. 
2. The applicant is advised that Bird Hazard records should be made available to
Glasgow Airport on request. There is also no need to inform, Glasgow Airport prior
to the dispersal of birds. 
Schedule of Plans 
Drawing Number Revision Drawing/Document Title Stamped 
Drawing  
Location Plan 
23020- OOB- ZZ- 00- DR-
L- 000001   
OVERALL SITE PLAN   
23020- OOB- ZZ- 00- DR-
L- 000091   
PHASE 1- ADVANCE WORKS 
23020- OOB- ZZ- 00- DR-
L- 000092 
PHASE 2 - BUS LOOP 
23020- OOB- ZZ- 00- DR-
L- 000093 
PHASE 3 - MAIN WORKS 
23020-DSSR-ET-XX-DR-
M-90001   
PROPOSED SITE PLAN -
PROPOSED SITE WIDE
EXTERNAL SERVICES PLAN 
23020-DSSR-ET-XX-DR-
M-90002 
PROPOSED SITE WIDE
EXTERNAL LIGHTING AND
SECURITY LAYOUT 
23020-HML-00-00-DR-A-
10100   
GA FLOORPLAN - LEVEL 00 
23020-HML-00-01-DR-A-
10101 
GA FLOORPLAN - LEVEL 01 
23020-HML-00-02-DR-A-
10102 
GA FLOORPLAN - LEVEL 02 
23020-HML-00-ZZ-DR-A-
10321   
ELEVATIONS - DINING
EXTENSION 
23020-HML-01-00-DR-A-
10100   
FLOOR PLAN - LEVEL 00

Page 13

PUBLIC
23020-HML-01-01-DR-A-
10110 
FLOOR PLAN - LEVEL 01 
23020-HML-01-02-DR-A-
10120   
FLOOR PLAN - LEVEL 02 
23020-HML-01-R1-DR-A-
10190 
ROOF PLAN 
23020-HML-01-ZZ-DR-A-
10200 
SECTIONS 
23020-HML-01-ZZ-DR-A-
10300 
ELEVATIONS   
23020-HML-02-00-DR-A-
10100   
FLOOR PLAN - LEVEL 00   
23020-HML-02-01-DR-A-
10110 
FLOOR PLAN - LEVEL 01 
23020-HML-02-R1-DR-A-
10190   
ROOF PLAN 
23020-HML-02-ZZ-DR-A-
10200   
SECTIONS 
23020-HML-02-ZZ-DR-A-
10300   
ELEVATIONS 
23020-HML-ZZ-ZZ-VS-A-
10701 
VISUALISATION - DINING
EXTENSION VIEW FROM
PLAYGROUND 
23020-OOB-ZZ-00-DR-L-
000010   
EXISTING AND PROPOSED
CONTOURS WITH EXISTING
TREES 
PLANTING STRATEGY 
SITE SECTIONS 
TYPICAL DETAILS 
CANOPY DETAILS 
SITE LOCATION PLAN 
SITE TOPOGRAPHICAL
SURVEY WITH SEWER ANNEX
FOOTPRINTS 
23020-SCE-XX-XX-DR-S-
52001 
PROPOSED BUS STANCE
EXTENSION - PROPOSED
DRAINAGE ALTERATIONS 
23020-SCE-XX-XX-DR-S-
52011 
PROPOSED CAR PARK
EXTENSION - PROPOSED
DRAINAGE ALTERATIONS 
23020-SCE-XX-XX-DR-S-
52021 
PROPOSED BUILDING
EXTENSION - PROPOSED
DRAINAGE ALTERATIONS

Page 14

PUBLIC
23020-SCE-XX-XX-DR-S-
90001 
PROPOSED BUS STANCE
EXTENSION TOPO OVERLAY 
23020-SCE-XX-XX-DR-S-
90002   
PROPOSED CAR PARK
EXTENSION TOPO OVERLAY 
23020-SCE-XX-XX-DR-S-
90003 
PROPOSED BUILDING
EXTENSION TOPO OVERLAY 
23020-SCE-XX-XX-DR-S-
90010 
PROPOSED ALTERATIONS TO
MAIN VEHICLE ENTRANCE AND
PEDESTRIAN GATE 
23020-SCE-XX-XX-DR-S-
90011 
PROPOSED BUS STANCE
EXTENSION - PROPOSED
LEVELS LAYOUT 
23020-SCE-XX-XX-DR-S-
90012   
PROPOSED CAR PARK
EXTENSION - PROPOSED
LEVELS LAYOUT 
23020-SCE-XX-XX-DR-S-
90013 
PROPOSED BUILDING
EXTENSION - PROPOSED
LEVELS LAYOUT 
23020-SCE-XX-XX-DR-S-
90051 
PROPOSED BUS STANCE
EXTENSION AND PROPOSED
BUS TRACKING 
23020-SCE-XX-XX-DR-S-
90052 
PROPOSED BUILDING
EXTENSION - PROPOSED FIRE
TENDER TRACKING 
5270-HML-00-ZZ-DR-A-
10321   
ELEVATIONS - DINING
EXTENSION 
CIVIL AND STRUCTURAL
DESIGN NARRATIVE 
ENVIRONMENTAL IMPACT
ASSESSMENT - SCREENING
CHECKLIST 
IFA - GROUND INVESTIGATION
REPORT - DECEMBER 2009 
IFA - GROUND INVESTIGATION
REPORT – OCTOBER 2023   
IFA - PRELIMINARY
INVESTIGATION REPORT -
PART 1 
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 2 
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 3 
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 4 
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 5

Page 15

PUBLIC  
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 6 
IFA - PRELIMINARY
INVESTIGATION REPORT –
PART 7 
SCHOOL TRAVEL STRATEGY   
025440-R01  NOISE SURVEY REPORT 
025440-R03-A    NOISE IMPACT ASSESSMENT   
23020  PMHS EXTENSION PAC
REPORT 
23020- OOB- ZZ- 00- DR-
L- 000030 
ACCESS AND SECURITY
STRATEGY 
23020-HML-ZZ-ZZ-RP-A-
61110_01 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_02 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_03 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_04 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_05 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_06 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-RP-A-
61110_07 
DESIGN AND ACCESS
STATEMENT 
23020-HML-ZZ-ZZ-VS-A-
10700 
VISUALISATION - TEACHING
ANNEX VIEW FROM
PLAYGROUND 
23020-OOB-XX-XX-RP-L-
006100 
LANDSCAPE MANAGEMENT
PLAN 
23020-OOB-ZZ-00-DR-L-
000015 
DEMOLITION PLAN 
25115  TRANSPORTATION
ASSESSMENT SCOPING
REPORT 
3279GEG-MCS-L01  GI COVERING STATEMENT   
AELSC0721  PRELIMINARY ECOLOGICAL
APPRAISAL AND PRELIMINARY
ROOST ASSESSMENT 
D 501_C8  PROPOSED SURFACE WATER
AND FOULD WATER DRAINAGE
LAYOUT

Page 16

PUBLIC
WS5345 25  BIRD HAZARD MANAGEMENT
PLAN 
1045-244  PARK MAINS HIGH SCHOOL
LEVEL 3 FRA 
3279 - 140825  DRAINAGE DESIGN
STATEMENT 
3279  DRAINAGE_STRATEGY_REPO
RT 
DUSK EMERGENCE SURVEY
AND INNS WALKOVER 
TRANSPORT ASSESSMENT
JULY 2025 
TRANSPORT ASSESSMENT
TECHNICAL ADDENDUM 
For further information please contact Fiona Knighton, Development Standards Team, Email:
fiona.knighton@renfrewshire.gov.uk